Vous êtes sur la page 1sur 3

CALCUL DES ELEMENTS DE DALLES SUR FOSSES, CANIVEAU ET GUIDE ROUE

Constat n°

Tableau de dimensionnement
DALETTE GUIDE ROUE
Epaisseur Poids au ml (Kg) longueur Poids Mois February 2023
Type Ouvrage largeur (m) Epaisseur (m) largeur (m)
(m) HA10 HA12 (m) HA10 (Kg)

60x60 0.15 5.8 12.19 0.9 0.2 0.2 0.9 5.33


80x80 0.15 6.96 14.67 1.1 0.2 0.2 1.1 6.64
100x100 0.15 8.11 17.28 1.31 0.2 0.2 1.31 7.95
FTB 0.15 5.22 21.39 1.66 0.2 0.2 1.66 10.46
FTrB_s 0.15 5.22 21.39 1.64 0.2 0.2 1.64 10.41
FTrB_e 0.15 8.7 35.44 2.77 0.2 0.2 2.77 17.28
60x60 : Dalot 60x60
80x80 : Dalot 80x80

100x100 : Dalot 100x100 Prix : 407 Prix : 405a Prix : 406a


CUMUL MOIS. PRODUCTION PRODUCTION CUMUL MOIS. PRODUCTION PRODUCTION PRODUCTION PRODUCTION
FTB : Fossé triangulaire bétonné (M-1) CUMULEE MENSUELLE (M-1) CUMULEE MENSUELLE
CUMUL MOIS. (M-1)
CUMULEE MENSUELLE

FTrB_s : Fossé trapézoïdal bétonné type Standard 59.90 95.17 35.27 516.94 833.63 316.70 7,099.36 11,657.63 4,558.27
FTrB_e : Fossé trapézoïdal bétonné type Exutoire

BETON DE QUALITE COFFRAGE ORDINAIRE ACIERS HAUTE ADHERENCE

Longueur
Localisation Pk Côté
Ouvrage (m)
Type Ouvrage Dalette Guide roue Volume (m³) Dalette Guide roue Surface (m²) Dalette Guide roue Poids (Kg) Période

Presso 08+850 Gauche Guide roue 60x60 - 0.072 - 0.88 - 10.66 December 2022

Presso 09+030 Gauche Guide roue 60x60 - 0.072 - - December 2022

Lot 2_Tr1 09+235 Droit Guide roue 80x80 - 0.088 - - December 2022

Lot 2_Tr2 28+130 Droit 10.25 FTrB_s December 2022

Lot 2_Tr1 00+100 Gauche 6.10 FTrB_s December 2022

Lot 2_Tr1 00+090 Gauche 12.00 FTrB_s December 2022

Lot 2_Tr1 03+740 Droit 10.45 FTrB_s December 2022

Amorce 03+610 Gauche 10.30 FTrB_s January 2023

Presso 09+089 Gauche Guide roue 60x60 - 0.072 - - January 2023

Presso 09+098 Droit Guide roue 80x80 - 0.088 - - January 2023

Cimétière Presso 09+390 Gauche 4.00 FTB 0.000 0.00 0.00 January 2023

Cimétière Presso 09+440 Gauche 4.03 FTB 0.000 0.00 0.00 January 2023

Lot 2_Tr1 09+790 Gauche 10.3 FTB January 2023

Attakro 16+900 Gauche Guide roue 60x60 - - - January 2023

Attakro 16+900 Droit Guide roue 60x60 - - - January 2023

Attakro 17+056 Gauche Guide roue 60x60 - - - January 2023

Attakro 17+280 Gauche Guide roue 60x60 - - - January 2023

Tienkoikro 19+010 Gauche Guide roue 80x80 - - - January 2023

Tienkoikro 19+180 Gauche 60x60 - - - January 2023

Lot 2_Tr2 25+320 Gauche 10.32 FTB January 2023

Takikro 32+140 Gauche Guide roue 80x80 - - - January 2023

Takikro 32+255 Droit Guide roue 80x80 - - - January 2023

Takikro 32+340 Droit 8.0 60x60 January 2023

Takikro 32+540 Droit 7.1 60x60 January 2023

Takikro 32+730 Gauche Guide roue 60x60 - - - January 2023

Lot 2_Tr1 00+740 Gauche 8.00 FTrB_s January 2023

Lot 2_Tr1 00+280 Gauche 12.45 FTrB_s January 2023

Tienkoikro 19+105 Gauche Guide roue 80x80 - - - January 2023

Takikro 32+255 Gauche Guide roue 80x80 - - - January 2023

Tienkoikro 19+340 Gauche Guide roue 80x80 - - - February 2023

Tienkoikro 19+067 Droit Guide roue 60x60 - - - February 2023

Lot 2_Tr1 04+300 Droit 12.1 FTB February 2023

Lot 2_Tr1 02+480 Droit 10 FTB February 2023

Lot 2_Tr2 31+840 Gauche 12.26 80x80 February 2023

Tienkoikro Sous prefecture Guide roue 60x60 - - - February 2023

Broffouédo 22+072 Gauche Guide roue 60x60 - - - February 2023

Ifo 25+793 Droit Guide roue 80x80 - - - February 2023

Ifo 25+794 Gauche Guide roue 80x80 - - - February 2023

Takikro 32+180 Droit 10.12 80x80 February 2023

Lot 2_Tr1 02+420 Droit 10 FTB February 2023

Takikro 32+840 Gauche 10.1 60x60 February 2023

Takikro 32+870 Gauche 8.15 60x60 February 2023

Takikro 32+460 Gauche 8.8 60x60 February 2023

Takikro 32+480 Droit 8.15 60x60 February 2023

Tienkoikro 19+415 Droit Guide roue 100x100 - 0.052 0.052 - 0.60 0.60 - 7.95 7.95 February 2023

Takikro 32+120 Gauche 8.15 80x80 February 2023

Takikro 32+070 Gauche 8.18 80x80 February 2023

Takikro 32+520 Gauche Guide roue 60x60 - - - February 2023

Takikro 32+674 Droit Guide roue 60x60 - - - February 2023

Lot 2_Tr1 00+690 Droit 10.2 FTrB_s February 2023


Longueur
Localisation Pk Côté
Ouvrage (m)
Type Ouvrage Dalette Guide roue Volume (m³) Dalette Guide roue Surface (m²) Dalette Guide roue Poids (Kg) Période

Lot 2_Tr1 02+960 Droit 10.45 FTB February 2023

Tienkoikro 19+454 Gauche Guide roue 80x80 - - - February 2023

Ifo 26+020 Gauche Guide roue 80x80 - - - February 2023

Takikro 32+050 Droit 15 80x80 February 2023

Takikro 32+430 Gauche 6.1 60x60 February 2023

Takikro 32+500 Gauche 8.1 60x60 February 2023

Lot2_Tr1 00+700 Droit 8.52 FTrB_s March 2023

Lot2_Tr1 02+940 Droit 10.52 FTrB_s March 2023

Deimba 14+080 Gauche 14.15 60x60 March 2023

Deimba 14+230 Gauche 14.2 60x60 March 2023

Tienkoikro 19+350 Gauche 5.94 60x60 March 2023

Ifo 26+020 Gauche 18.46 80x80 March 2023

Ifo 26+115 Gauche 8.12 60x60 March 2023

Ifo 26+290 Gauche 8.12 60x60 March 2023

Ifo 26+285 Droit 8.2 60x60 March 2023

Ifo 26+410 Gauche 11.48 60x60 March 2023

Ifo 26+400 Droit 14.18 60x60 March 2023

Attakro 16+280 Gauche 8.03 80x80 March 2023

Attakro 16+310 Gauche 6 80x80 March 2023

Ifo 26+110 Droit 8.13 60x60 March 2023

Ifo 26+210 Gauche 6.09 60x60 March 2023

Deimba 13+940 Gauche 14.37 80x80 March 2023

Broffouédo 22+070 Droit 8.36 60x60 March 2023

Broffouédo 22+180 Gauche 6.32 60x60 March 2023

Broffouédo 22+180 Droit 6.39 60x60 March 2023

Broffouédo 25+920 Gauche 6.36 80x80 March 2023

Lot2_Tr2 18+240 Gauche 9.97 60x60 March 2023

Takikro 32+880 Droit 6.37 FTrB_s March 2023

Takikro 32+890 Gauche 6.1 60x60 March 2023

Pour l'entreprise Pour la Mission de Contrôle


CALCUL DALETTE POSE SUR REGARD POUR DALOT DE TRAVERSEE constat n°:

Tableau de dimensionnement pour 1ml

L (ml) l (ml) E (ml) Béton (m3) Ferraillage (Kg) Coffrage (m²)

Dalette 1 0.45 0.2 0.09 9.66 1.03

Mois February 2023

Prix : 407 Prix : 405a Prix : 406a


CUMUL MOIS. PRODUCTION PRODUCTION CUMUL MOIS. PRODUCTION PRODUCTION PRODUCTION PRODUCTION
CUMUL MOIS. (M-1)
(M-1) CUMULEE MENSUELLE (M-1) CUMULEE MENSUELLE CUMULEE MENSUELLE

0.92 1.18 0.26 6.49 8.34 1.85 60.86 78.25 17.39

BETON DE QUALITE COFFRAGE ORDINAIRE ACIERS HAUTE ADHERENCE

Largeur
Localisation Pk Côté
Ouvrage (m)
Nbre de Dalle Longueur Total Dalette Volume (m³) Dalette Surface (m²) Dalette Poids (Kg) Période

Tienkoikro 19+415 Gauche 1.62 6 2.7 0.394 0.394 2.78 2.78 26.08 26.08 December 2022

Brouffouédo 21+900 Gauche 1.62 4 1.8 0.262 0.262 1.85 1.85 17.39 17.39 December 2022

Presso 09+235 Gauche 1.62 4 1.8 0.262 0.262 1.85 1.85 17.39 17.39 December 2022

Takikro 32+050 Droit 1.62 4 2 0.262 0.262 1.854 1.854 17.388 17.388 February 2023

- - - - - - -

- - - - - - -

- - - - - - -

Pour l'entreprise Pour la MDC