Académique Documents
Professionnel Documents
Culture Documents
100.00% 350,000.00
90.00%
COSTO 300,000.00
PAR-
80.00% CIAL -
LB0
COSTO
PAR-
CIAL - 250,000.00
70.00%
REAL
LB0
%
ACU-
60.00% MU-
LADO - 200,000.00
LB0
%
50.00% ACU-
MU-
LADO
REAL - 150,000.00
40.00% LB00
30.00%
100,000.00
20.00%
50,000.00
10.00%
0.00% -
19-Mar-23 26-Mar-23 2-Apr-23 9-Apr-23 16-Apr-23 23-Apr-23 30-Apr-23 7-May-23
19-Mar-23
26-Mar-23
16-Apr-23
23-Apr-23
30-Apr-23
7-May-23
2-Apr-23
9-Apr-23
1.0
2.0 COSTO PARCIAL - LB0 24,188.54 43,471.18 35,869.55 112,569.33 295,146.71 99,395.14 11,627.11
3.0 COSTO ACUMULADO - LB0 - 24,188.54 67,659.72 103,529.27 216,098.60 511,245.31 610,640.45 622,267.56
8.0 COSTO PARCIAL - REAL LB0 55,523 42,346
9.0 COSTO ACUMULADO - REAL LB0 - 55,523 97,869 97,869 97,869 97,869 97,869 #REF!
14.0 Forecast
16.0
17.0 % PARCIAL - LB0 3.89% 6.99% 5.76% 18.09% 47.43% 15.97% 1.87%
18.0 % ACUMULADO - LB0 0.00% 3.89% 10.87% 16.64% 34.73% 82.16% 98.13% 100.00%
24.0 % PARCIA REAL - LB00 0.00% 8.92% 6.81%
25.0 % ACUMULADO REAL - LB00 0.00% 8.92% 15.73%
30.0 % Forecast
2
DET
ID
EDT
PRESUPUESTO
1.1
1.1.1
1.1.1.1
1.1.1.2
1.1.1.3
1.1.1.4
1.1.1.5
1.1.2
1.1.2.1
1.1.2.2
1.1.2.3
1.1.2.4
1.2 1
1.2.1 1.14
1.2.1.1 01.14.01
1.2.2 1.15
1.2.2.1 01.15.01
1.2.3 1.01
1.2.3.1 01.01.01
1.2.3.1.1 01.01.01.01
1.2.3.1.2 01.01.01.02
1.2.3.1.3 01.01.01.03
1.2.3.1.4 01.01.01.04
1.2.3.1.5 01.01.01.05
1.2.3.1.6 01.01.01.06
1.2.3.1.7 01.01.01.07
1.2.3.2 01.01.02
1.2.3.2.1 01.01.02.01
1.2.3.2.2 01.01.02.02
1.2.3.2.3 01.01.02.03
1.2.3.3 01.01.03
1.2.3.3.1 01.01.03.01
1.2.3.3.2 01.01.03.02
1.2.3.3.3 01.01.03.03
1.2.3.3.4 01.01.03.04
1.2.3.4 01.01.04
1.2.3.4.1 01.01.04.01
1.2.3.4.2 01.01.04.02
1.2.3.4.3 01.01.04.03
1.2.4 1.02
1.2.4.1 01.02.01
1.2.4.1.1 01.02.01.01
1.2.4.1.2 01.02.01.02
1.2.4.1.3 01.02.01.03
1.2.5 1.03
1.2.5.1 01.03.01
1.2.5.1.1 01.03.01.01
1.2.6 1.04
1.2.6.1 01.04.01
1.2.6.1.1 01.04.01.01
1.2.6.1.2 01.04.01.02
1.2.7 1.05
1.2.7.1 01.05.01
1.2.7.1.1 01.05.01.01
1.2.7.1.2 01.05.01.02
1.2.8 1.06
1.2.8.1 01.06.01
1.2.8.1.1 01.06.01.01
1.2.9 1.07
1.2.9.1 01.07.01
1.2.10 1.08
1.2.10.1 01.08.01
1.2.10.2 01.08.02
1.2.11 1.09
1.2.11.1 01.09.01
1.2.11.2 01.09.02
1.2.12 01.09.03
1.2.12.1 01.09.03.01
1.2.13 1.1
1.2.13.1 01.10.01
1.2.13.1.1 01.10.01.01
1.2.13.2 01.10.02
1.2.13.2.1 01.10.02.01
1.2.13.3 01.10.03
1.2.13.3.1 01.10.03.01
1.2.13.4 01.10.04
1.2.13.4.1 01.10.04.01
1.2.13.5 01.10.05
1.2.13.5.1 01.10.05.01
1.2.13.5.2 01.10.05.02
1.2.13.5.3 01.10.05.03
1.2.14 1.11
1.2.14.1 01.11.01
1.2.14.1.1 01.11.01.01
1.2.14.1.2 01.11.01.02
1.2.14.1.3 01.11.01.03
1.2.14.2 01.11.02
1.2.14.2.1 01.11.02.01
1.2.14.2.2 01.11.02.02
1.2.14.2.3 01.11.02.03
1.2.14.2.4 01.11.02.04
1.2.14.3 01.11.03
1.2.14.3.1 01.11.03.01
1.2.14.3.2 01.11.03.02
1.2.14.3.3 01.11.03.03
1.2.14.4 01.11.04
1.2.14.4.1 01.11.04.01
1.2.14.4.2 01.11.04.02
1.2.14.5 01.11.05
1.2.14.5.1 01.11.05.01
1.2.14.5.2 01.11.05.02
1.2.14.5.3 01.11.05.03
1.2.14.5.4 01.11.05.04
1.2.14.5.5 01.11.05.05
1.2.14.6 01.11.06
1.2.14.6.1 01.11.06.01
1.2.14.7 01.11.07
1.2.14.7.1 01.11.07.01
1.2.14.8 01.11.08
1.2.14.8.1 01.11.08.01
1.2.14.9 1.12
1.2.14.9.1 01.12.01
1.2.14.10 01.12.02
1.2.14.10.1 01.12.02.01
1.2.14.11 1.13
1.2.14.11.1 01.13.01
1.2.14.12 01.13.02
1.2.14.12.1 01.13.02.01
1.2.14.13 01.13.03
1.2.14.13.1 01.13.03.01
1.2.14.14 01.13.04
1.2.14.14.1 01.13.04.01
1.2.14.14.2 01.13.04.02
1.3 1
1.3.1 1.14
1.3.1.1 01.14.01
1.3.2 1.15
1.3.2.1 01.15.01
1.3.3 1.01
1.3.3.1 01.01.01
1.3.3.1.1 01.01.01.01
1.3.3.1.2 01.01.01.02
1.3.3.1.3 01.01.01.03
1.3.3.1.4 01.01.01.04
1.3.3.1.5 01.01.01.05
1.3.3.1.6 01.01.01.06
1.3.3.2 01.01.02
1.3.3.2.1 01.01.02.01
1.3.3.2.2 01.01.02.02
1.3.3.3 01.01.03
1.3.3.3.1 01.01.03.01
1.3.3.3.2 01.01.03.02
1.3.3.3.3 01.01.03.03
1.3.3.3.4 01.01.03.04
1.3.3.4 01.01.04
1.3.3.4.1 01.01.04.01
1.3.3.4.2 01.01.04.02
1.3.3.4.3 01.01.04.03
1.3.4 1.02
1.3.4.1 01.02.01
1.3.4.1.1 01.02.01.01
1.3.4.1.2 01.02.01.02
1.3.4.1.3 01.02.01.03
1.3.5 1.03
1.3.5.1 01.03.01
1.3.5.1.1 01.03.01.01
1.3.6 1.04
1.3.6.1 01.04.01
1.3.6.1.1 01.04.01.01
1.3.6.1.2 01.04.01.02
1.3.7 1.05
1.3.7.1 01.05.01
1.3.7.1.1 01.05.01.01
1.3.7.1.2 01.05.01.02
1.3.8 1.06
1.3.8.1 01.06.01
1.3.8.1.1 01.06.01.01
1.3.9 1.07
1.3.9.1 01.07.01
1.3.10 1.08
1.3.10.1 01.08.01
1.3.10.2 01.08.02
1.3.11 1.09
1.3.11.1 01.09.01
1.3.12 1.1
1.3.12.1 01.10.01
1.3.12.1.1 01.10.01.01
1.3.12.1.2 01.10.01.02
1.3.12.2 01.10.02
1.3.12.2.1 01.10.02.01
1.3.12.3 01.10.03
1.3.12.3.1 01.10.03.01
1.3.12.3.2 01.10.03.02
1.3.12.3.3 01.10.03.03
1.3.12.3.4 01.10.03.04
1.3.12.3.5 01.10.03.05
1.3.12.4 01.10.04
1.3.12.4.1 01.10.04.01
1.3.12.4.2 01.10.04.02
1.3.12.4.3 01.10.04.03
1.3.12.4.4 01.10.04.04
1.3.12.5 1.11
1.3.12.5.1 01.11.01
1.3.12.5.1.1 01.11.01.01
1.3.12.5.2 01.11.02
1.3.12.5.2.1 01.11.02.01
1.3.12.5.3 01.11.03
1.3.12.5.3.1 01.11.03.01
1.3.12.5.4 01.11.04
1.3.12.5.4.1 01.11.04.01
1.3.12.6 1.12
1.3.12.6.1 01.12.01
1.3.12.6.1.1 01.12.01.01
1.3.13 1.13
1.3.13.1 01.13.01
1.3.13.1.1 01.13.01.01
1.3.13.2 01.13.02
1.3.13.2.1 01.13.02.01
1.3.13.3 01.13.03
1.3.13.3.1 01.13.03.01
1.3.13.4 01.13.04
1.3.13.4.1 01.13.04.01
1.3.13.5 01.13.05
1.3.13.5.1 01.13.05.01
1.3.13.6 01.13.06
1.3.13.6.1 01.13.06.01
1.3.13.6.2 01.13.06.02
1.3.13.6.3 01.13.06.03
DETALLE DE CU
SALIDA PARA ACCESS POINT PARA AMBIENTE - CAJA Y PLACA ( FACE PLATE ) S/ 1,698.54
RECTANGULAR DE PARED SIMPLE - PUERTO Y CONECTOR RJ45 CAT 6A
SALIDA PARA CCTV - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE PARED S/ 1,698.54
SIMPLE - PUERTO Y CONECTOR RJ45 CAT 6A
SALIDA PARA PULSADOR DE TIMBRE - CAJA Y PLACA ( FACE PLATE )
S/ 566.18
RECTANGULAR DE PARED SIMPLE - PULSADOR SIMPLE
SISTEMA DE DETECCION DE ALARMA CONTRA INCENDIO S/ 3,407.24
SALIDA PARA DETECTOR DE HUMO - FOTOELECTRICO SENSOR S/ 571.08
SALIDA PARA DETECTOR DE TEMPERATURA - SENSOR S/ 571.08
SALIDA PARA PULSADOR DE ALARMA CONTRAINCENDIOS -ACTUADOR
S/ 1,121.08
MANUAL DE ALERTA
CABLE FPL 4x22 AWG S/ 1,144.00
TUBERIA S/ 4,225.72
SISTEMA DE AUDIO Y VIDEO S/ 1,922.94
TUBERIA PVC-SAP 3/4"Ø SISTEMA AUDIO Y VIDEO S/ 1,922.94
SISTEMA TV CABLE S/ 854.64
TUBERIA PVC-SAP 3/4"Ø SISTEMA TV CABLE S/ 854.64
SISTEMA CABLEADO ESTRUCTURADO S/ 854.64
TUBERIA PVC-SAP 3/4"Ø SISTEMA DE CABLE ESTRUCTURADO S/ 854.64
SISTEMA DE DETECCION DE ALARMA CONTRA INCENDIO S/ 593.50
TUBERIA PVC-SAP 3/4"Ø SISTEMA CONTRA INCENDIO SENSORES S/ 593.50
CAJAS DE PASO S/ 2,163.20
SISTEMA DE AUDIO Y VIDEO S/ 2,163.20
CAJA DE PASO F°G° CUADRADA 100X100X50mm EMPOTRADO - SISTEMA
S/ 2,163.20
AUDIO Y VIDEO
INSTALACIONES ELECTRICAS S/ 16,750.82
SALIDAS PARA LUMINARIAS S/ 3,339.44
SALIDA DE ALUMBRADO PARA ADOSAR INCLUYE TUBO, CAJA Y CABLE S/ 3,339.44
SALIDA PARA INTERRUPTORES S/ 401.52
SALIDA PARA INTERRUPTOR DE CONMUTACION S/ 401.52
SUMINISTRO E INSTALACION DE CAJAS DE PASE S/ 525.42
CAJA DE PASE METALICA DE FIERRO GALVANIZADO 100X100X50MM S/ 525.42
SUMINISTRO E INSTALACION DE CABLES S/ 4,195.20
CABLE ELECTRICO 2-1x4mm2(F+N) LSOH+1x4mm2LSOH/(T) S/ 4,195.20
SUMINISTRO E INSTALACION S/ 6,032.88
LUMINARIA IDS 23W DOWNLIGHT, MONTAJE SUSPENDIDO S/ 6,032.88
SUMINISTRO E INSTALACION DE LLAVES TERMOMAGNETICA S/ 2,256.36
LLAVE TERMOMAGNETICA 2X20 A S/ 190.80
LLAVE DIFERENCIAL S/ 363.80
SELECTOR DE TEMPORALIZADOR S/ 1,701.76
ETALLE DE CURVA "S" REV.0
3/26/2023 4/2/2023
25CC,30,21F
C+10
6 días 3/27/2023 4/1/2023 18FC-8 días
días,33CC,6
9FC+10 días
8,684.69
8 días 4/18/2023 4/25/2023 69 38
5 días 3/27/2023 3/31/2023 23CC 26CC 6,293.91
3 días 3/27/2023 3/29/2023 25CC 27CC 1,128.32
3 días 3/27/2023 3/29/2023 26CC 1,147.44
15 días 4/2/2023 4/16/2023 612.85
2 días 4/14/2023 4/15/2023 30 43
12 días 4/2/2023 4/13/2023 23 29,31 612.85
3 días 4/14/2023 4/16/2023 30
22 días 3/27/2023 4/17/2023 1,415.43
22 días 3/27/2023 4/17/2023 23CC 34CC,63
759.2
21 días 3/27/2023 4/16/2023 33CC 656.23
1 día 4/14/2023 4/14/2023 21 4
1 día 4/15/2023 4/15/2023 22FC+1 día 4
4 días 4/26/2023 4/29/2023
2 días 4/26/2023 4/27/2023 24 39CC,51
2 días 4/26/2023 4/27/2023 38CC 40
2 días 4/28/2023 4/29/2023 39
3 días 4/16/2023 4/18/2023
3 días 4/16/2023 4/18/2023
720.39
21,998.13 7,332.71
4,289.95 4,070.24
442.34
4,289.95 2,451.40
1,176.50
1,415.43 2,673.11 108.46
3,191.44
1,590.17 1,590.17
1,699.46
5,458.97
5,458.97
5,458.97
1,393.68 527.15
1,393.68 527.15
339.39
1,054.29 527.15
8,269.11 3,056.37
8,269.11 3,056.37
5,212.74
3,056.37 3,056.37
23,882.50
23,882.50
23,882.50
8,325.12
8,325.12
35,691.15
33,611.55
2,079.60
713.1 2,513.60
713.1
2,513.60
16,186.92 3,237.38
16,186.92 3,237.38
150.12 3,491.22
527.28
527.28
150.12
150.12
883.2
883.2
952.56
952.56
1,128.18
95.4
181.9
850.88
12,369.22 11,282.87
6,101.22
2,497.74
1,741.74
1,861.74
3,611.91
1,076.37
1,230.18
585.18
720.18
929.97
382.83
287.22
259.92
1,467.12
1,212.12
255
259
120
48
39
28
24
564.51
564.51
315.12
315.12
1,251.63
1,251.63
1,074.72
1,074.72
332.22
332.22
1,139.38
1,139.38
221.48
221.48
1,383.81
1,383.81
5,000.00
2,500.00
2,500.00
24,322.13 46,334.79 192,607.96 72,587.77 11,100.01
4,800.00 4,800.00 4,800.00
4,800.00 4,800.00 4,800.00
1,042.04
1,042.04
18,480.09 20,191.27 51,988.74 11,134.42
13,229.81 6,075.01 35,469.35 11,134.42
1,033.05 2,066.09
3,186.94
1,702.08
13,229.81
33,403.26 11,134.42
152.94
5,250.28 12,250.66 717.3
717.3
5,250.28 12,250.66
15,802.09
5,583.15
4,655.04
2,781.95
2,781.95
1,865.60
268.2
1,147.50
449.9
33,531.64
33,531.64
5,175.30
7,962.87
20,393.47
11,820.60
11,820.60
11,820.60
1,708.61 430.66
1,708.61 430.66
1,277.95
430.66 430.66
13,963.06
13,963.06
1,737.58
12,225.48
25,076.63 25,076.63
25,076.63 25,076.63
25,076.63 25,076.63
6,449.22 19,347.67
6,449.22 19,347.67
2,801.60 1,582.08
428.48
2,373.12 1,582.08
19,634.91 26,179.87
19,634.91 26,179.87
15,565.94 9,698.67 97.49
5,928.12
2,961.81
2,966.31
1,428.21
1,428.21
8,209.61
1,698.54
2,547.81
1,698.54
1,698.54
566.18
3,309.75 97.49
571.08
571.08
1,023.59 97.49
1,144.00
4,225.72
1,922.94
1,922.94
854.64
854.64
854.64
854.64
593.5
593.5
2,163.20
2,163.20
2,163.20
5,748.30 11,002.52
834.86 2,504.58
834.86 2,504.58
200.76 200.76
200.76 200.76
175.14 350.28
175.14 350.28
1,398.40 2,796.80
1,398.40 2,796.80
2,010.96 4,021.92
2,010.96 4,021.92
1,128.18 1,128.18
95.4 95.4
181.9 181.9
850.88 850.88
35,869.55 112,569.33 295,146.71 99,395.14 11,627.11
103,529.27 216,098.60 511,245.31 610,640.45 622,267.56
5.8% 18.1% 47.4% 16.0% 1.9%
16.6% 34.7% 82.2% 98.1% 100.0%
SEGUIMIENTO DE OBRA
Proyecto
Cliente
Ubicación
Contratista
Fecha
ID
EDT PROJECT PRESUPUEST Descripción Presupuesto Base Anterior Actual Acumulado Saldo
O
Und. Metrado PU Parcial Total CD Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
1.2 1 REHABILITACION NIVEL INICIAL S/ 251,126.38
1.2.1 1.14 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALES
1.2.1.1 01.14.01 TRANSPORTE DE EQUIPOS Y MATERIALES glb 1.00 24,000.00 S/ 24,000.000 0.37 S/ 8,914.29 37.14% 0.13 S/ 3,120.00 13.00% 0.50 S/ 12,034.29 50.14% 0.50 S/ 11,965.71 49.86%
1.2.2 1.15 SSOMA
1.2.2.1 01.15.01 TRABAJOS PRELIMINARES - INICIAL glb 1.00 15,630.58 S/ 15,630.580 0.93 S/ 14,588.54 93.33% 0.02 S/ 312.61 2.00% 0.95 S/ 14,901.15 95.33% 0.05 S/ 729.43 4.67%
1.2.3 1.01 OBRAS PRELIMINARES
1.2.3.1 01.01.01 REMOCIONES
1.2.3.1.1 01.01.01.01 DESMONTAJE DE VENTANAS INC. VIDRIO m2 17.88 39.18 S/ 700.538 0.00 S/ - 0.00% 17.88 S/ 700.54 100.00% 17.88 S/ 700.54 100.00% 0.00 S/ - 0.00%
1.2.3.1.2 01.01.01.02 DESMONTAJE DE PUERTAS INC. MARCO m2 17.88 40.29 S/ 720.385 0.00 S/ - 0.00% 8.94 S/ 360.19 50.00% 8.94 S/ 360.19 50.00% 8.94 S/ 360.19 50.00%
1.2.3.1.3 01.01.01.03 DESMONTAJE DE TEJA ANDINA m2 310.50 27.97 S/ 8,684.685 0.00 S/ - 0.00% 310.50 S/ 8,684.69 100.00% 310.50 S/ 8,684.69 100.00% 0.00 S/ - 0.00%
1.2.3.1.4 01.01.01.04 MONTAJE DE TEJA ANDINA m2 311.50 94.16 S/ 29,330.840 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 311.50 S/ 29,330.84 100.00%
1.2.3.1.5 01.01.01.05 REMOCION DE ENCHAPE DE PISO m2 178.50 35.26 S/ 6,293.910 89.25 S/ 3,146.96 50.00% 89.25 S/ 3,146.96 50.00% 178.50 S/ 6,293.91 100.00% 0.00 S/ - 0.00%
1.2.3.1.6 01.01.01.06 REMOCION DE ENCHAPE DE MURO m2 32.00 35.26 S/ 1,128.320 32.00 S/ 1,128.32 100.00% 0.00 S/ - 0.00% 32.00 S/ 1,128.32 100.00% 0.00 S/ - 0.00%
27 de 31
SEGUIMIENTO DE OBRA
Proyecto
Cliente
Ubicación
Contratista
Fecha
ID
EDT PROJECT PRESUPUEST Descripción Presupuesto Base Anterior Actual Acumulado Saldo
O
Und. Metrado PU Parcial Total CD Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
1.2.3.1.7 01.01.01.07 DESMONTAJE DE APARATOS SANITARIOS und 21.00 54.64 S/ 1,147.440 21.00 S/ 1,147.44 100.00% 0.00 S/ - 0.00% 21.00 S/ 1,147.44 100.00% 0.00 S/ - 0.00%
1.2.3.2 01.01.02 DEMOLICIONES
1.2.3.2.1 01.01.02.01 CORTE Y PICADO PARA JUNTA e=2" m 18.50 23.91 S/ 442.335 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 18.50 S/ 442.34 100.00%
1.2.3.2.2 01.01.02.02 DEMOLICION DE PISOS m2 178.50 41.20 S/ 7,354.200 53.55 S/ 2,206.26 30.00% 124.95 S/ 5,147.94 70.00% 178.50 S/ 7,354.20 100.00% 0.00 S/ - 0.00%
1.2.3.2.3 01.01.02.03 DEMOLICION DE VEREDAS EXISTENTES m3 25.00 47.06 S/ 1,176.500 0.00 S/ - 0.00% 15.00 S/ 705.90 60.00% 15.00 S/ 705.90 60.00% 10.00 S/ 470.60 40.00%
1.2.3.3 01.01.03 ELIMINACION DE MATERIAL EXCEDENTE
1.2.3.3.1 01.01.03.01 ELIMINACION DE MATERIAL EXCEDENTE PROVENIENTE DE DEMOLICIONES Y DESMONTAJES m3 40.60 58.77 S/ 2,386.062 5.36 S/ 314.71 13.19% 35.25 S/ 2,071.35 86.81% 40.60 S/ 2,386.06 100.00% 0.00 S/ - 0.00%
1.2.3.3.2 01.01.03.02 ACARREO MANUAL DE MATERIAL EXCEDENTE m3 40.60 48.49 S/ 1,968.694 5.36 S/ 259.66 13.19% 35.25 S/ 1,709.03 86.81% 40.60 S/ 1,968.69 100.00% 0.00 S/ - 0.00%
1.2.3.3.3 01.01.03.03 DISPOSICION FINAL DE VENTANAS DESMONTADAS INC. VIDRIO m2 17.88 35.17 S/ 628.840 0.00 S/ - 0.00% 17.88 S/ 628.84 100.00% 17.88 S/ 628.84 100.00% 0.00 S/ - 0.00%
1.2.3.3.4 01.01.03.04 DISPOSICION FINAL DE PUERTAS DESMONTADAS INC. VIDRIO m2 17.88 35.17 S/ 628.840 8.94 S/ 314.42 50.00% 8.94 S/ 314.42 50.00% 17.88 S/ 628.84 100.00% 0.00 S/ - 0.00%
1.2.3.4 01.01.04 RESANES
1.2.3.4.1 01.01.04.01 RESANE DE AREAS AFECTADAS POR HUMEDAD m2 42.00 63.74 S/ 2,677.080 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 42.00 S/ 2,677.08 100.00%
1.2.3.4.2 01.01.04.02 RESANE EN ZONA DE CORTE PARA GENERACION DE JUNTA m 18.50 38.25 S/ 707.625 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 18.50 S/ 707.63 100.00%
1.2.3.4.3 01.01.04.03 RESANE DE MUROS m2 20.00 44.99 S/ 899.800 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 20.00 S/ 899.80 100.00%
1.2.4 1.02 REHABILITACION ESTRUCTURAS
1.2.4.1 01.02.01 JUNTAS
1.2.4.1.1 01.02.01.01 JUNTA DE AISLAMIENTO SISMICO e=2"CON MATERIAL ELASTOMERICO m 18.50 172.51 S/ 3,191.435 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 18.50 S/ 3,191.44 100.00%
1.2.4.1.2 01.02.01.02 JUNTA DE AISLAMIENTO SISMICO e=1"CON MATERIAL ELASTOMERICO m 18.50 171.91 S/ 3,180.335 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 18.50 S/ 3,180.34 100.00%
1.2.4.1.3 01.02.01.03 INSTALACION DE TAPAJUNTA METALICA m 6.80 249.92 S/ 1,699.456 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 6.80 S/ 1,699.46 100.00%
1.2.5 1.03 REHABILITACION DE ARQUITECTURA 0.00
1.2.5.1 01.03.01 SELLOS 0.00
1.2.5.1.1 01.03.01.01 SELLOS CORTAFUEGOS m 50.80 107.46 S/ 5,458.968 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 50.80 S/ 5,458.97 100.00%
1.2.6 1.04 REVOQUES Y REVESTIMIENTOS 0.00
1.2.6.1 01.04.01 TARRAJEOS 0.00
1.2.6.1.1 01.04.01.01 TARRAJEO FROTACHADO DE MUROS INTERIORES MEZCLA C:A 1:5, e= 1.0cm m2 8.10 41.90 S/ 339.390 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 8.10 S/ 339.39 100.00%
1.2.6.1.2 01.04.01.02 VESTIDURA DE DERRAMES ANCHO=0.14m, MEZCLA C:A 1:5, E= 1.0 cm m2 56.00 28.24 S/ 1,581.440 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 56.00 S/ 1,581.44 100.00%
1.2.7 1.05 CARPINTERIA DE MADERA 0.00
1.2.7.1 01.05.01 PUERTAS 0.00
1.2.7.1.1 01.05.01.01 PUERTA BATIENTE DE 1 HOJA DE 90° SEGÚN ESPECIFICACION P-2 und 3.00 1,737.58 S/ 5,212.740 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 3.00 S/ 5,212.74 100.00%
1.2.7.1.2 01.05.01.02 PUERTA BATIENTE DE 2 HOJAS DE 90° SEGÚN ESPECIFICACION P-2 und 3.00 2,037.58 S/ 6,112.740 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 3.00 S/ 6,112.74 100.00%
1.2.8 1.06 CARPINTERIA DE VIDRIO
1.2.8.1 01.06.01 VENTANAS
1.2.8.1.1 01.06.01.01 VENTANA CON MARCO DE ALUMINIO SEGÚN ESPECIFICACION und 10.00 2,388.25 S/ 23,882.500 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 10.00 S/ 23,882.50 100.00%
1.2.9 1.07 CARPINTERIA METALICA 0.00
1.2.9.1 01.07.01 DIVISOR DE S.S.H.H INICIAL, PUERTA BATIETE DE 1 HOJA DE 90° und 3.00 2,775.04 S/ 8,325.120 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 3.00 S/ 8,325.12 100.00%
28 de 31
SEGUIMIENTO DE OBRA
Proyecto
Cliente
Ubicación
Contratista
Fecha
ID
EDT PROJECT PRESUPUEST Descripción Presupuesto Base Anterior Actual Acumulado Saldo
O
Und. Metrado PU Parcial Total CD Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
1.2.13.5.3 01.10.05.03 SELECTOR DE TEMPORALIZADOR und 1.00 850.88 S/ 850.880 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 1.00 S/ 850.88 100.00%
29 de 31
SEGUIMIENTO DE OBRA
Proyecto
Cliente
Ubicación
Contratista
Fecha
ID
EDT PROJECT PRESUPUEST Descripción Presupuesto Base Anterior Actual Acumulado Saldo
O
Und. Metrado PU Parcial Total CD Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
1.3.3.2.2 01.01.02.02 DEMOLICION DE PISOS m2 424.78 41.20 S/ 17,500.936 0.00 S/ - 0.00% 127.98 S/ 5,272.78 30.13% 127.98 S/ 5,272.78 30.13% 296.80 S/ 12,228.16 69.87%
1.3.3.3 01.01.03 ELIMINACION DE MATERIAL EXCEDENTE
1.3.3.3.1 01.01.03.01 ELIMINACION DE MATERIAL EXCEDENTE PROVENIENTE DE DEMOLICIONES Y DESMONTAJES m3 95.00 58.77 S/ 5,583.150 0.00 S/ - 0.00% 10.00 S/ 587.70 10.53% 10.00 S/ 587.70 10.53% 85.00 S/ 4,995.45 89.47%
1.3.3.3.2 01.01.03.02 ACARREO MANUAL DE MATERIAL EXCEDENTE m3 96.00 48.49 S/ 4,655.040 0.00 S/ - 0.00% 10.00 S/ 484.90 10.42% 10.00 S/ 484.90 10.42% 86.00 S/ 4,170.14 89.58%
1.3.3.3.3 01.01.03.03 DISPOSICION FINAL DE VENTANAS DESMONTADAS INC. VIDRIO m2 79.10 35.17 S/ 2,781.947 0.00 S/ - 0.00% 45.20 S/ 1,589.68 57.14% 45.20 S/ 1,589.68 57.14% 33.90 S/ 1,192.26 42.86%
1.3.3.3.4 01.01.03.04 DISPOSICION FINAL DE PUERTAS DESMONTADAS INC. VIDRIO m2 79.10 35.17 S/ 2,781.947 0.00 S/ - 0.00% 35.55 S/ 1,250.29 44.94% 35.55 S/ 1,250.29 44.94% 43.55 S/ 1,531.65 55.06%
1.3.3.4 01.01.04 RESANES
1.3.3.4.1 01.01.04.01 RESANE DE BARANDAS m 6.00 44.70 S/ 268.200 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 6.00 S/ 268.20 100.00%
1.3.3.4.2 01.01.04.02 RESANE EN ZONA DE CORTE PARA GENERACION DE JUNTA m 30.00 38.25 S/ 1,147.500 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 30.00 S/ 1,147.50 100.00%
1.3.3.4.3 01.01.04.03 RESANE DE MUROS m2 10.00 44.99 S/ 449.900 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 10.00 S/ 449.90 100.00%
1.3.4 1.02 REHABILITACION ESTRUCTURAS
1.3.4.1 01.02.01 JUNTAS
1.3.4.1.1 01.02.01.01 JUNTA DE AISLAMIENTO SISMICO e=2"CON MATERIAL ELASTOMERICO m 30.00 172.51 S/ 5,175.300 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 30.00 S/ 5,175.30 100.00%
1.3.4.1.2 01.02.01.02 JUNTA DE AISLAMIENTO SISMICO e=1"CON MATERIAL ELASTOMERICO m 46.32 171.91 S/ 7,962.871 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 46.32 S/ 7,962.87 100.00%
1.3.4.1.3 01.02.01.03 INSTALACION DE TAPAJUNTA METALICA m 81.60 249.92 S/ 20,393.472 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 81.60 S/ 20,393.47 100.00%
1.3.5 1.03 REHABILITACION DE ARQUITECTURA
1.3.5.1 01.03.01 SELLOS
1.3.5.1.1 01.03.01.01 SELLOS CORTAFUEGOS m 110.00 107.46 S/ 11,820.600 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 110.00 S/ 11,820.60 100.00%
1.3.6 1.04 REVOQUES Y REVESTIMIENTOS
1.3.6.1 01.04.01 TARRAJEOS
1.3.6.1.1 01.04.01.01 TARRAJEO FROTACHADO DE MUROS INTERIORES MEZCLA C:A 1:5, e= 1.0cm m2 30.50 41.90 S/ 1,277.950 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 30.50 S/ 1,277.95 100.00%
1.3.6.1.2 01.04.01.02 VESTIDURA DE DERRAMES ANCHO=0.14m, MEZCLA C:A 1:5, E= 1.0 cm m2 30.50 28.24 S/ 861.320 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 30.50 S/ 861.32 100.00%
1.3.7 1.05 CARPINTERIA DE MADERA
1.3.7.1 01.05.01 PUERTAS
1.3.7.1.1 01.05.01.01 PUERTA BATIENTE DE 1 HOJA DE 90° SEGÚN ESPECIFICACION P-2 und 1.00 1,737.58 S/ 1,737.580 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 1.00 S/ 1,737.58 100.00%
1.3.7.1.2 01.05.01.02 PUERTA BATIENTE DE 2 HOJAS DE 90° SEGÚN ESPECIFICACION P-2 und 6.00 2,037.58 S/ 12,225.480 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 6.00 S/ 12,225.48 100.00%
1.3.8 1.06 CARPINTERIA DE VIDRIO
1.3.8.1 01.06.01 VENTANAS
1.3.8.1.1 01.06.01.01 VENTANA CON MARCO DE ALUMINIO SEGÚN ESPECIFICACION und 21.00 2,388.25 S/ 50,153.250 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 21.00 S/ 50,153.25 100.00%
1.3.9 1.07 PISOS
1.3.9.1 01.07.01 PISOS PULIDOS m2 424.78 60.73 S/ 25,796.889 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 424.78 S/ 25,796.89 100.00%
1.3.10 1.08 CARPINTERIA METALICA
1.3.10.1 01.08.01 INSTALACION DE BARANDAS Y PASAMANOS (ESCALERA) m 5.20 82.40 S/ 428.480 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 5.20 S/ 428.48 100.00%
1.3.10.2 01.08.02 INSTALACION DE BARANDAS Y PASAMANOS m 48.00 82.40 S/ 3,955.200 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 48.00 S/ 3,955.20 100.00%
1.3.11 1.09 IMPERMEABILIZACIÓN
1.3.11.1 01.09.01 IMPERMEABILIZACIÓN CON ADITIVOS m2 473.00 96.86 S/ 45,814.780 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 473.00 S/ 45,814.78 100.00%
1.3.12 1.1 REHABILITACION DE INSTALACIONES DE COMUNICACIONES
1.3.12.1 01.10.01 SISTEMA DE AUDIO Y VIDEO
SALIDA PUNTO VIDEO DOCENTE PROYECTOR - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE
1.3.12.1.1 01.10.01.01 und 9.00 329.09 S/ 2,961.810 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 9.00 S/ 2,961.81 100.00%
PARED SIMPLEPUNTO
- PUERTO Y CONECTOR
DOCENTE HDMI TIPO HEMBRA
01.10.01.02 TECHOSALIDA VIDEO PROYECTOR - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE
1.3.12.1.2 und 9.00 329.59 S/ 2,966.310 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 9.00 S/ 2,966.31 100.00%
SIMPLE - PUERTO Y CONECTOR HDMI TIPO MACHO
1.3.12.2 01.10.02 SISTEMA TV CABLE
SALIDA PUNTO TV DOCENTE - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE PARED SIMPLE -
1.3.12.2.1 01.10.02.01 PUERTO und 9.00 158.69 S/ 1,428.210 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 9.00 S/ 1,428.21 100.00%
Y CONECTOR COAXIAL RG6
1.3.12.3 01.10.03 SISTEMA CABLEADO ESTRUCTURADO
01.10.03.01 PAREDSALIDA DOBLE DE INTERNET PARA PC Y TELEFONO - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE
1.3.12.3.1 und 6.00 283.09 S/ 1,698.540 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 6.00 S/ 1,698.54 100.00%
SALIDAPUNTO
SALIDA DOBLE A - PUERTO
INTERNETY CONECTOR RJ45 YCAT
PARA PC - CAJA 6A ( FACE PLATE ) RECTANGULAR DE PARED
PLACA
1.3.12.3.2 01.10.03.02 und 9.00 283.09 S/ 2,547.810 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 9.00 S/ 2,547.81 100.00%
SIMPLE - PUERTO Y CONECTOR RJ45PARA
CAT 6A
01.10.03.03 PAREDSALIDA PARA ACCESS POINT AMBIENTE - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE
1.3.12.3.3 und 6.00 283.09 S/ 1,698.540 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 6.00 S/ 1,698.54 100.00%
SIMPLEPARA
SALIDA - PUERTO
CCTV Y- CONECTOR
CAJA Y RJ45
PLACA ( CAT 6A
FACE PLATE ) RECTANGULAR DE PARED SIMPLE - PUERTO Y
1.3.12.3.4 01.10.03.04 CONECTOR RJ45 CAT 6A und 6.00 283.09 S/ 1,698.540 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 6.00 S/ 1,698.54 100.00%
SALIDA PARA PULSADOR DE TIMBRE - CAJA Y PLACA ( FACE PLATE ) RECTANGULAR DE PARED
1.3.12.3.5 01.10.03.05 und 2.00 283.09 S/ 566.180 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 566.18 100.00%
SIMPLE - PULSADOR SIMPLE
1.3.12.4 01.10.04 SISTEMA DE DETECCION DE ALARMA CONTRA INCENDIO
1.3.12.4.1 01.10.04.01 SALIDA PARA DETECTOR DE HUMO - FOTOELECTRICO SENSOR und 2.00 285.54 S/ 571.080 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 571.08 100.00%
1.3.12.4.2 01.10.04.02 SALIDA PARA DETECTOR DE TEMPERATURA - SENSOR und 2.00 285.54 S/ 571.080 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 571.08 100.00%
1.3.12.4.3 01.10.04.03 SALIDA PARA PULSADOR DE ALARMA CONTRAINCENDIOS -ACTUADOR MANUAL DE ALERTA und 2.00 560.54 S/ 1,121.080 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 1,121.08 100.00%
1.3.12.4.4 01.10.04.04 CABLE FPL 4x22 AWG m 32.00 35.75 S/ 1,144.000 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 32.00 S/ 1,144.00 100.00%
1.3.12.5 1.11 TUBERIA
1.3.12.5.1 01.11.01 SISTEMA DE AUDIO Y VIDEO
1.3.12.5.1.1 01.11.01.01 TUBERIA PVC-SAP 3/4"Ø SISTEMA AUDIO Y VIDEO m 81.00 23.74 S/ 1,922.940 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 81.00 S/ 1,922.94 100.00%
1.3.12.5.2 01.11.02 SISTEMA TV CABLE
1.3.12.5.2.1 01.11.02.01 TUBERIA PVC-SAP 3/4"Ø SISTEMA TV CABLE m 36.00 23.74 S/ 854.640 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 36.00 S/ 854.64 100.00%
1.3.12.5.3 01.11.03 SISTEMA CABLEADO ESTRUCTURADO
1.3.12.5.3.1 01.11.03.01 TUBERIA PVC-SAP 3/4"Ø SISTEMA DE CABLE ESTRUCTURADO m 36.00 23.74 S/ 854.640 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 36.00 S/ 854.64 100.00%
1.3.12.5.4 01.11.04 SISTEMA DE DETECCION DE ALARMA CONTRA INCENDIO
1.3.12.5.4.1 01.11.04.01 TUBERIA PVC-SAP 3/4"Ø SISTEMA CONTRA INCENDIO SENSORES m 25.00 23.74 S/ 593.500 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 25.00 S/ 593.50 100.00%
1.3.12.6 1.12 CAJAS DE PASO
1.3.12.6.1 01.12.01 SISTEMA DE AUDIO Y VIDEO
1.3.12.6.1.1 01.12.01.01 CAJA DE PASO F°G° CUADRADA 100X100X50mm EMPOTRADO - SISTEMA AUDIO Y VIDEO und 26.00 83.20 S/ 2,163.200 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 26.00 S/ 2,163.20 100.00%
1.3.13 1.13 INSTALACIONES ELECTRICAS
1.3.13.1 01.13.01 SALIDAS PARA LUMINARIAS
1.3.13.1.1 01.13.01.01 SALIDA DE ALUMBRADO PARA ADOSAR INCLUYE TUBO, CAJA Y CABLE und 19.00 175.76 S/ 3,339.440 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 19.00 S/ 3,339.44 100.00%
1.3.13.2 01.13.02 SALIDA PARA INTERRUPTORES
1.3.13.2.1 01.13.02.01 SALIDA PARA INTERRUPTOR DE CONMUTACION und 2.00 200.76 S/ 401.520 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 401.52 100.00%
1.3.13.3 01.13.03 SUMINISTRO E INSTALACION DE CAJAS DE PASE
1.3.13.3.1 01.13.03.01 CAJA DE PASE METALICA DE FIERRO GALVANIZADO 100X100X50MM und 7.00 75.06 S/ 525.420 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 7.00 S/ 525.42 100.00%
1.3.13.4 01.13.04 SUMINISTRO E INSTALACION DE CABLES
1.3.13.4.1 01.13.04.01 CABLE ELECTRICO 2-1x4mm2(F+N) LSOH+1x4mm2LSOH/(T) m 95.00 44.16 S/ 4,195.200 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 95.00 S/ 4,195.20 100.00%
1.3.13.5 01.13.05 SUMINISTRO E INSTALACION
1.3.13.5.1 01.13.05.01 LUMINARIA IDS 23W DOWNLIGHT, MONTAJE SUSPENDIDO und 19.00 317.52 S/ 6,032.880 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 19.00 S/ 6,032.88 100.00%
1.3.13.6 01.13.06 SUMINISTRO E INSTALACION DE LLAVES TERMOMAGNETICA
1.3.13.6.1 01.13.06.01 LLAVE TERMOMAGNETICA 2X20 A und 2.00 95.40 S/ 190.800 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 190.80 100.00%
1.3.13.6.2 01.13.06.02 LLAVE DIFERENCIAL und 2.00 181.90 S/ 363.800 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 363.80 100.00%
1.3.13.6.3 01.13.06.03 SELECTOR DE TEMPORALIZADOR und 2.00 850.88 S/ 1,701.760 0.00 S/ - 0.00% 0.00 S/ - 0.00% 0.00 S/ - 0.00% 2.00 S/ 1,701.76 100.00%
30 de 31
SEGUIMIENTO DE OBRA
Proyecto
Cliente
Ubicación
Contratista
Fecha
ID
EDT PROJECT PRESUPUEST Descripción Presupuesto Base Anterior Actual Acumulado Saldo
O
Und. Metrado PU Parcial Total CD Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
31 de 31