Boq For Ro Plant Foundation V1 - 29 01 2023
Boq For Ro Plant Foundation V1 - 29 01 2023
DALLAGE= 0.15
Ep latérite = 1 20.00 15.00 0.00 0.00 94.78 0.00 0.00 28.43 2085
0.5
Ep grave =
Ep BP =
0 0.00 94.78 0.00 0.00 28.43 2085.23
0.395
823.67
Prof, fouilles =
1.50
20 832.36 25.08619650392
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
SOMME 0 0
4 - - 265.0 2,760.8 2,760.8 - - - - - -
0.222 0.395 0.617 0.888 1.208 1.578 2.466 3.847 6.336 9.896
SEMELLES
Béton de Débord
Longrine= 0 Nbr Dimension Fouilles Laterite Grave 0/40 Coffrage Prof, fouilles
Volume béton propreté fouille
L l H/E
F1 0 0.7 0.7 0.2 0.098 0.000 0.000 0.000 0.000 0.000 0.000 0.900 0.200
BP
0.1
Good earth
0
Gravel
0
SOMME 0 0.49
0 0 0 0.200 0.000 0.000 0.000 0.000 0.000 0.000
LT= S=
FUTS
Nbr Dimension Volume béton Coffrage
Futs sur: L l H/E
F1 0 0.2 0.2 0.9 0.036 0.000 0.360 0.000
0 0.000 0.000 0.000 0.000
0
0
0
0
0
0
0
0
SOMME 0 0.04
0 0 0 0.900 0.000 0.000
LT= S=
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
SOMME 0 0
0 - - - - - - - - - -
0.222 0.395 0.617 0.888 1.208 1.578 2.466 3.847 6.336 9.896
POIDS - - - - - - - - - - -
LONGRINE
LONGRINE FOUILLES EN RIGOLES ACIER
Longueur Largeur H Longrine Nbre Volume Coffrage TN Longueur Largeur H Nbre Volume HA8
Lg1 0 0.2 0.2 1 0.000 0.000 67.73 0.000 0.6 0.5 1 0 0.27 0
Lg2 0.000 0.000 FFL
Lg3 0.000 0.000 68
Lg4 0.000 0.000
Lg5 0.000 0.000
Lg6 0.000 0.000
TOTAL béton 0.000 0.000 0.000 0.000 0.600 0.500 1.000 0.000 0.000
0.395
0.000
SOUBASSEMENT
MACONNERIE 20 PLEINS BETON DE PROPRETE
Longueur Largeur H Nbre Surf Enduit ext Longueur Largeur H Nbre Volume
Long 0.000 0.2 0.45 1 0.000 0.000 0.000 0.6 0.1 1 0
Déd futs 0.000
Déd raid 0.000
0.000
0.000
0.000
TOTAL béton 0.000 0.000 0.000 0.000 0.600 0.100 1.000 0.000
165.688
5,950
7,140.3
ACIER
HA10
0.00
0.000
0.617
0.000 -
BENIN-GDIZ GLO-DJIGBE
Sr.
ITEM DESCRIPTION UNIT QTY Rate AMOUNT (CFA)
No.
I CIVIL WORK
B EARTHWORK
Earth Work in Excavation in all kinds of soil (Excluding rock &
boulders) and backfilling in foundation trenches, column pits using
1.01 mechanical means, from existing ground level including dressing of CuM 173.97 4,000 695,891
sides and bottom to final level, to receive PCC and ramming
bottom. Storage of excavation materials in one place.
1.02 Excess earth to be removed from the site CuM 127.52 3,000 382,556
Providing and filling in Plinth, foundation and wherever required as
per direction of the Engineer, in layer not exceeding 200 mm.
2
Thick, compacted including watering, ramming, consolidating and
dressing etc. at all lead and lifts.
2.01 With available good earth CuM 46.45 2,000 92,908
2.02 Good earth to be Brought from outside CuM 0.00 8,500 0
2.03 Silty sand CuM 0.00 8,500 0
2.04 Laterite compacted at 95% CuM 136.68 9,500 1,298,486
2.05 Crushed gravel class 0/40 under foundation CuM 37.16 26,000 966,173
2.06 Crushed gravel class 0/25 under foundation CuM 0.00 26,000 0
2.07 Providing and laying plastic film polyane (200 microns minimum) SqM 189.57 1,500 284,349
Providing and placing bituminous dampproufing membrane to
2.08 SqM 0.00 15,500 0
concrete surface
C CONCRETE WORK
Laying plain cement concrete C15 (Min. cement content of 150
1 Kg/CuM) under foundations Footings/beams including formwork at CuM 12.03 70,000 842,304
all levels & height
II ASSEMBLY WORK
I PRELIMINARY WORK
2.1 Anchor bolt sealing Au 1 -
Sr.
ITEM DESCRIPTION UNIT QTY Rate AMOUNT (CFA)
No.
I CIVIL WORK
B EARTHWORK
Earth Work in Excavation in all kinds of soil (Excluding rock &
boulders) and backfilling in foundation trenches, column pits using
1.01 mechanical means, from existing ground level including dressing of CuM 173.97 0
sides and bottom to final level, to receive PCC and ramming
bottom. Storage of excavation materials in one place.
1.02 Excess earth to be removed from the site CuM 127.52 0
Providing and filling in Plinth, foundation and wherever required as
per direction of the Engineer, in layer not exceeding 200 mm.
2
Thick, compacted including watering, ramming, consolidating and
dressing etc. at all lead and lifts.
2.01 With available good earth CuM 46.45 0
2.02 Good earth to be Brought from outside CuM 0.00 0
2.03 Silty sand CuM 0.00 0
2.04 Laterite compacted at 95% CuM 136.68 0
2.05 Crushed gravel class 0/40 under foundation CuM 37.16 0
2.06 Crushed gravel class 0/25 under foundation CuM 0.00 0
2.07 Providing and laying plastic film polyane (200 microns minimum) SqM 189.57 0
Providing and placing bituminous dampproufing membrane to
2.08 SqM 0.00 0
concrete surface
C CONCRETE WORK
Laying plain cement concrete C15 (Min. cement content of 150
1 Kg/CuM) under foundations Footings/beams including formwork at CuM 12.03 0
all levels & height
II ASSEMBLY WORK
A PRELIMINARY WORK
3.1 Anchor bolt sealing Au 1 -
CIVIL WORK
Sr. No. ITEM DESCRIPTION QTY (Kg) QTY (TONNE)
CIVIL WORK