Vous êtes sur la page 1sur 9

Cycle Time (Detik) Alat Gali Muat Excavator OB Cycle Time (Detik) Alat Gali Muat Excavator OB

Nama Alat Digging Swing isi Swing Kosong Nama Alat Digging
3.88 7.37 2.75 7.33
5.85 8.91 6.64 7.95
5.96 5.25 4.71 6.08
3.31 6.66 3.67 8.99
7.45 4.86 3.5 7.98
5.5 6.63 3.11 9.76
5.82 6.08 3.42 6.56
9 7.16 2.25 9.09
6 7.12 3.45 6.58
7.87 8.28 3.99 10.41
9.56 9.38 4.01 7.71
UN AB 267 8.17 4.52 3.85 8.26
4.51 5.97 4.79 6.68
4.52 7.72 3.13 10.48
5.29 6.58 4.43 7.7
7.85 7.04 4.02 7.67
5.89 8.41 5.58 7.65
9.02 7.58 5.9 8.61
7.76 8.5 4.95 6.3
3.45 6.85 4.95 7.79
8.59 5.82 5.32 10.97
7.96 10.09 4.45 5.4
9.13 4.61 4.74 10.43
Total 152.34 161.39 97.61 6.33
UN AB 273
rata-rata 6.62 7.02 4.24 7.56
CT Exca 17.88 10.23
8.06
6.39
7.01
7.07
6.39
6.78
8.78
8.24
6.55
10.76
10
7.37
12.14
10.07
11.09
12.66
11.76
8.95
8.57
9.94
7.89
7.91
Total 404.88
Rata-rata 8.44
CT EXCA 23.16
Detik) Alat Gali Muat Excavator OB Cycle Time (Detik) Alat Gali Muat Excavator Coal

Swing isi Swing Kosong Nama Alat Digging Swing isi Swing Kosong
10.36 4.67 16.45 5 6.3
6.06 8.77 16 10 8
8.93 5.17 17 11 6
7.03 5.62 27 11 6
8.3 5.93 15 10 8
9.99 4.76 25.52 7.81 3.59
7.75 5.26 20 4.12 3.83
9.09 5.14 28.31 10.27 9
9.81 4.92 29.57 8.36 4.51
9.93 7.04 17.1 8.47 5.09
8.16 4.65 16.18 14.03 6.85
7.96 4.97 10.38 7.27 12.22
9.86 6.91 13.36 8.07 4.3
9.8 4.64 9.72 11.08 9.84
8.92 4.52 7.92 12.36 7.43
9.71 5.12 8.3 27.33 9.45
8.92 5.59 9.45 15.85 10.61
9.38 4.87 12.06 8.42 10.72
8.91 5.13 UN AB 169 14.28 7.83 6.28
6.75 4.57 8.56 8.67 13.36
7.91 4.57 11.83 7.83 10.1
8.24 4.41 9.24 10.4 8.36
8.07 7.12 7.75 8.54 4.29
9.66 3.9 9.03 9.12 6.59
10.17 6.06 20.81 10.06 5.1
8.36 4.14 29.8 9.25 4.98
8.62 4.21 22.88 10.99 4.18
9.5 4.51 27.15 11.6 6.17
9.09 3.71 28.16 8.22 3.4
9.25 5.22 10.03 11.45 3.53
6.79 6.29 7.25 10.48 4.14
9.25 4.44 16.51 11.38 4.99
8.42 2.99 7.58 8.84 4.14
8.46 4.55 8.19 7.58 4.99
9.92 4.4 7.67 10.4 4.14
9.58 7.52 12.87 8.32 4.46
9.09 7.06 9.7 9.2 6.47
13.51 4.6 Total 568.61 370.6 241.41
11.64 5.84 rata-rata 15.37 16.11 10.50
8.49 8.12 CT Exca 41.98
10.79 6.54
10.44 5.19
13.86 4.66
9.07 8.12
11.64 6.75
11.99 5.93
10.12 5.44
9.94 4.91
447.49 259.45
9.32 5.41
23.16
Cycle Time (Detik) Alat Gali Muat Excavator COAL_
6/09/2023
Nama Alat Digging Swing isi Swing Kosong
9.66 5.21 3.78
9.2 10.76 4.76
9 7.43 14.65
6.43 8.13 9.27
22.04 16.94 6.02
13.27 7.62 8.81
7.13 7.82 8.1
8.45 10.49 9.25
9.34 4.05 8.12
9.85 8.27 5
25.67 9.53 6.18
9.53 6.18 9.94
9.03 3.99 8
12.12 4.18 16.01
4.55 11.08 12.6
41.56 6.41 4.24
UN AB 169
4.85 6.04 5.74
5.56 10.58 14.56
4.94 18.38 9.4
21.34 20 5.53
23.36 16.3 15.84
8.9 9.94 21.03
9.65 12.3 6.7
12.12 4.51 2.69
18.59 6.08 12.92
22.41 7.99 14
25.45 6.36 11.33
5.45 9.06 6.96
5.31 10.58 6.25
25.07 5.78 18.09
7.76 7.59 6.82
5.24 9.44 30.6
Total 412.83 289.02 323.19
rata-rata 12.90 12.57 14.05
CT Exca 39.52
Swing 12 Menit
474.23
Waktu Loading 7.90 Menit
Dump Truck OB (Overburden) dengan jarak 2,4 KM
Nama Alat Antri Manuver Spotting Loading hauling isi manuver spotting dumping
22.25 15.12 34.68 45.26 333.60 25.26 52.00 42.75
UN TR 080
22.76 40.62 51.55 329,4 24.61 52.83 41.63
(SCANIA)
18.11 51.11 58.52 327,6 16.99 21.77 39.67
Avarage 22.25 18.66 42.14 51.78 333.60 22.29 42.20 41.35
49.16 9.65 24.21 76.20 391.80 15.36 23.40 26.19
UN TR 218 43.47 9.77 22.95 70.20 385.20 16.72 25.35 33.18
(HINO) 30.67 9.45 24.58 68.40 448.20 13.50 29.84 38.79
43.33 9.20 22.41 67.20 395.40 17.21 25.49 37.13
Avarage 41.66 9.52 23.54 70.50 405.15 15.70 26.02 33.82
0.00 12.50 13.09 126.00 370.80 8.29 15.76 17.75
0.00 13.41 12.09 129.60 361.20 17.65
UN TR 139 0.00 11.23 15.47 139.80 360.00 13.47 13.42 22.00
(HD465) 0.00 19.94 19.41 136.80 384.60 12.97 13.57 20.89
0.00 15.34 11.59 94.80 360.00 14.05 11.05 16.65
0.00 21.13 11.58 128.40 349.40 11.50
Avarage 0.00 15.59 13.87 125.90 364.33 12.20 13.45 17.74
17.13 28.00 88.84 348.97 17.24 27.83 29.55
Dump Truck OB (Overburden) dengan jarak 2,9 KM
Nama Alat Antri Manuver Spotting Loading hauling isi manuver spotting dumping
UN TR 143 0 20.92 0 96.00 1081.80 0 0 42.75
UN TR 141 0 39.43 0 126.60 1020.60 0 0 41.63
UN TR 142 0 33.68 0 94.80 904.80 0 0 39.67
Avarage 0 31.34 0 105.80 1002.40 0 0 41.35
UN TR 079 122.4 39.43 0 57.34 1039.80 0 0 53.41
UN TR 080 309 59.64 0 70.20 1039.80 0 0 45.81
UN TR 209 0 35.43 0 60.03 1021.80 0 0 38.79
0 0 0 0 0
Avarage 107.85 44.83 0 62.52 775.35 0 0 46.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Avarage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
hauling kosong Total menit Nama Alat Antri Manuver Spotting
304.20 875.12 14.59 915 70.2
372.00 606.00 10.10 188.4 67.65
303.00 509.17 8.49 UN TR 212 747.6 66.6
326.40 900.66 15.01 1164 68.4
427.20 1043.17 17.39 94.8 56.69
392.40 999.24 16.65
435.60 1099.03 18.32
420.00 1037.37 17.29
418.80 1044.70 17.41 0.311055556
394.80 958.99 15.98
452.40 986.35 16.44
490.80 1066.19 17.77
433.80 1041.98 17.37
389.40 912.88 15.21
392.60 914.61 15.24
425.63 980.17 16.34
376.02

hauling kosong Total Menit


0 1241.47 20.69
0 1228.26 20.47
0 1072.95 17.88
0 1180.89 19.68
0 1312.38 21.87
0 1524.45 25.41
0 1156.05 19.27
0 0.0
0 1036.56 17.28
0.00 0.00 0.00

0.00 0.00 0.00


Dump Truck CO (Coal)
Total tanpa
Loading hauling isi manuver spotting dumping hauling kosong hambatan
menit
381 856.8 63.2 35.65 798 3119.85 52.00
384.6 744 59.45 33.92 664.8 2142.82 35.71
301.2 748.8 68.26 33.72 802.2 2768.38 46.14
319.8 727.8 71.1 30.28 627 3008.38 50.14
320 730.1 69.8 35 702 2008.39 33.47
Hambatan Total Menit
1570.8 510 5200.65 86.68 Jumat
2142.82 35.71
302.4 249 3319.78 55.33
1266.6 4274.98 71.25
1350 3358.39 55.97

Vous aimerez peut-être aussi