N R L DEVIATION
Name of Work: Relocation/Enabling Works for DCU Revamp of NREP
Job No: B440
Client: NRL
Consultant: Engineers India Ltd Date of Test- 18.08.2021
Contractor : P K Construction

Grade of Concrete :M-30 Remarks.


Strength of 28 days
Sl.No. Date of casting Location / Structure Register Sl.No.
(N/mm2)
1 12.10.2022 32.96 Area 32N (pour card sl no-001) 4 to 6
2 12.10.2022 33.08 Area 32N (pour card sl no-001) 7 to 9
3 15.10.2022 33.23 Area 32N (pour card sl no-002) 13 to 15
4 15.10.2022 33.50 Area 32N (pour card sl no-002) 16 to 18
5 20.10.2022 34.06 Area 32N (pour card sl no-003) 22 to 24
6 20.10.2022 34.00 Area 32N (pour card sl no-003) 25 to 27
7 22.10.2022 34.62 Area 32N (pour card sl no-004) 31 to 33
8 22.10.2022 34.76 Area 32N (pour card sl no-004) 34 to 36
9 29.10.2022 35.33 Area 32N (pour card sl no-005) 40 to 42
10 29.10.2022 35.45 Area 32N (pour card sl no-005) 43 to 45
11 01.11.2022 35.27 Area 32N (pour card sl no-006) 49 to 51
12 01.11.2022 35.41 Area 32N (pour card sl no-006) 52 to 54
13 03.11.2022 34.84 Area 32N (pour card sl no-007) 58 to 60
14 03.11.2022 35.07 Area 32N (pour card sl no-007) 61 to 63
15 05.11.2022 34.13 Area 32N (pour card sl no-008) 67 to 69
16 05.11.2022 33.75 Area 32N (pour card sl no-008) 70 to 72
17 09.11.2022 33.41 Area 32N (pour card sl no-009) 76 to 78
18 09.11.2022 33.24 Area 32N (pour card sl no-009) 79 to 81
19 15.11.2022 34.73 Area 32N (pour card sl no-010) 85 to 87
20 15.11.2022 34.58 Area 32N (pour card sl no-010) 88 to 90
21 17.11.2022 35.35 Area 32N (pour card sl no-011) 94 to 96
22 17.11.2022 35.60 Area 32N (pour card sl no-011) 97 to 99
23 19.11.2022 35.60 Area 32N (pour card sl no-012) 103 to 105
24 19.11.2022 35.73 Area 32N (pour card sl no-012) 106 to 108
25 21.11.2022 34.31 Area 32N (pour card sl no-013) 112 to 114
26 21.11.2022 34.73 Area 32N (pour card sl no-013) 115 to 117
27 21.11.2022 34.59 Area 32N (pour card sl no-013) 118 to 120
28 23.11.2022 34.56 Area 14N (pour card sl no-014) 124 to 126
29 23.11.2022 34.86 Area 14N (pour card sl no-014) 127 to 129
30 24.11.2022 33.91 Area 32N (pour card sl no-015) 133 to 135
Total 1034.66 N/mm²
Average 34.49 N/mm²
S.D 0.83
Max 35.73 N/mm²
Min 32.96 N/mm²
fck+0.825σ 30.68 N/mm²
fck + 4 N/mm2 34.00 N/mm²

SIGN. OF PKC SIGN. OF EIL SIGN. OF NRL


CALCULATION OF STANDARD DEVIATION
NAME OF THE WORK : CONSTRUCTION OF FIRE WATER RESERVOIR

NAME OF THE CONTRACTOR :

DESIGN MIX : M-30


FROM :

AVG.28 DAYS AVG. STRENGTH DEVIATION (Z)=(X- SQUARE OF


SL NO DATE OF CASTING DATE OF TESTING
RESULT (MPA) X (MPA) (x') x') DEVIATION (Z')=(Z²)

1 06.06.2018 04.07.2018 35.99 0.36 0.13


2 06.06.2018 04.07.2018 36.44 0.81 0.65
3 06.06.2018 04.07.2018 36.29 0.66 0.43
4 06.06.2018 04.07.2018 35.69 0.06 0.00
5 06.06.2018 04.07.2018 35.55 -0.08 0.01
6 13.06.2018 11.07.2018 34.88 -0.75 0.56
7 13.06.2018 11.07.2018 33.51 -2.12 4.50
8 13.06.2018 11.07.2018 34.09 -1.54 2.38
9 13.06.2018 11.07.2018 33.59 -2.04 4.17
10 13.06.2018 11.07.2018 35.70 0.07 0.00
11 21.06.2018 19.07.2018 35.88 0.25 0.06
12 21.06.2018 19.07.2018 36.59 0.96 0.92
13 21.06.2018 19.07.2018 36.18 0.55 0.30
14 21.06.2018 19.07.2018 37.18 1.55 2.40
15 21.06.2018 19.07.2018 34.84 -0.79 0.63
35.63
16 25.06.2018 23.07.2018 36.01 0.38 0.14
17 25.06.2018 23.07.2018 34.53 -1.10 1.21
18 25.06.2018 23.07.2018 39.30 3.67 13.5
19 25.06.2018 23.07.2018 35.30 -0.33 0.11
20 25.06.2018 23.07.2018 36.19 0.56 0.31
21 25.06.2018 23.07.2018 34.86 -0.77 0.59
22 08.07.2018 05.08.2018 36.32 0.69 0.47
23 08.07.2018 05.08.2018 34.61 -1.02 1.04
24 08.07.2018 05.08.2018 36.64 1.01 1.02
25 08.07.2018 05.08.2018 36.27 0.64 0.41
26 08.07.2018 05.08.2018 34.33 -1.30 1.69
27 11.07.2018 08.08.2018 35.57 -0.06 0.00
28 11.07.2018 08.08.2018 35.64 0.01 0.00
29 11.07.2018 08.08.2018 35.98 0.35 0.12
30 11.07.2018 08.08.2018 34.99 -0.64 0.41
1068.94 35.63 38.15
Standard Deviation = √[(Z'/(N-1)]Mpa =√[38.15/(30-1)]Mpa = 1.5 Mpa N=30
[fck + 0.825 x Established Standard Deviation ]N/mm²= 30+0.825x1.5 = 31.23 N/mm²

Acceptance Criteria of Compressive Strength


The Concrete is deemed to comply with compressive strength requirements when both the conditions as per table of 11 of IS : 456 are
met.

a) The mean strength determine from any standard deviation from any group of four consecutive test result >fck + 0.825 x established
standard deviation or fck + 3 N/mm² whichever is greater.

b) Any individual test result ≥fck - 3 N/mm².Thus, the result meets the criteria.E.g.Concrete cubes results from Sl. No. 1 to 30 average is
30 Mpa ≥ (30+3)=33Mpa.Therefore,first criteria individual concrete cubes results from Sl No 1 to 30 are >(30-3) = 27 Mpa

Hence the concrete test result mentioned from Sl Nos 1 to 30 is accepted.