KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +


KEUNTUNGAN
1 2 3 4 5 6
1 ASSET
1 3 ASSET TETAP
1 3 2 PERALATAN DAN MESIN
1 3 2 01 ALAT BESAR
1 3 2 01 01 ALAT BESAR DARAT
1 3 2 01 01 01 TRACTOR
1 3 2 01 01 01 001 ASPHALT MIXING PLANT (E155) 150 HP, 30 T/Jam Unit 3,628,820,234 554,483,732
1 3 2 01 01 01 002 ASPHALT FINISHER (E157) 30 HP, 6 TON Unit 718,358,357 109,765,157
1 3 2 01 01 01 003 ASPHAL SPRAYER E 154, 6 HP, 800 LITER Unit 103,680,215 15,842,337
1 3 2 01 01 01 004 BULLDOZER 100 - 150 HP (E001) 110 HP Unit 2,123,801,676 324,516,896
1 3 2 01 01 01 005 COMPRESOR (E301) 35 HP Unit 6,307,912 963,849
1 3 2 01 01 01 006 CONCRETE MIXER 0,3 - 0,6 M3 (E252) 20 HP, 500 LITER Unit 14,811,448 2,263,189
1 3 2 01 01 01 007 CRANE 10 - 15 TON (E225) 148 HP, 15 Ton Unit 370,286,684 56,579,805
1 3 2 01 01 01 008 DUMP TRUCK 3,5 TON (E211) 115 HP, 3,5 Ton Unit 377,329,544 57,655,954
1 3 2 01 01 01 009 DUMP TRUCK 5 TON (E212) 145 HP, 5 Ton Unit 458,091,782 69,996,424
1 3 2 01 01 01 010 EXCAVATOR 80 - 140 HP (E020) 90 HP, 0,5 M3 Unit 1,639,264,880 250,479,674
1 3 2 01 01 01 011 FLAT BED TRUCK 3 - 4 M3 (E221) 115 HP, 4 M3 Unit 547,201,296 83,612,358
1 3 2 01 01 01 012 GENERATOR Set (E311) 10 HP, 125 KVA Unit 148,116,302 22,632,171
1 3 2 01 01 01 013 MOTOR GRADER > 100 HP (E110) 100 HP Unit 2,124,454,964 324,616,718
1 3 2 01 01 01 014 TRACK LOADER 75 - 100 HP (E051) 135 HP, 1,6 M3 Unit 659,112,650 100,712,413
1 3 2 01 01 01 015 WHEEL LOADER 1,0 - 1,6 M3 (E052) 115 HP, 1,5 M3 Unit 1,569,978,452 239,892,707
1 3 2 01 01 01 016 THREE WHEEL ROLLER 6 - 8 T (E080) 37 HP, 8 TON Unit 627,991,365 95,957,081
1 3 2 01 01 01 017 TANDEM ROLLER 6 - 8 TON (E081) 40 HP, 8 TON Unit 593,893,650 90,746,950
1 3 2 01 01 01 018 TIRE ROLLER 8 - 10 T (E084) 95 HP, 10 TON Unit 1,069,836,112 163,470,958
1 3 2 01 01 01 019 VIBRATOR ROLLER 5 - 8 T (E082) 51 HP, 7 TON Unit 1,069,836,112 163,470,958
1 3 2 01 01 01 020 CONCRETE VIBRATOR (E089) 4 HP Unit 4,443,500 678,967
1 3 2 01 01 01 021 STONE CRUSHER (E031) 185 HP, 30 TON/JAM Unit 2,221,726,416 339,479,796
1 3 2 01 01 01 022 WATER PUMP 70 - 100 MM (E341) 8 HP Unit 4,443,500 678,967
1 3 2 01 01 01 023 WATER TANKER 3.000 - 4.500 Liter (E182) 115 HP, 4.000 LITER Unit 186,625,700 28,516,407
1 3 2 01 01 01 024 PEDESTRIAN ROLLER (E087) 12 HP, 1 TON Unit 109,241,964 16,692,172
1 3 2 01 01 01 025 TAMPER (E088) 4 HP, 0,2 TON Unit 9,771,398 1,493,070
1 3 2 01 01 01 026 JACK HAMMER (E351) 3 HP Unit 5,185,676 792,371
1 3 2 01 01 01 027 FULVI MIXER (E27) 75 HP Unit 68,134,203 10,410,906
1 3 2 01 01 01 028 CONCRETE PUMP (E28) 100 HP, 8 M3 Unit 166,630,404 25,461,126
1 3 2 01 01 01 029 TRAILER 20 TON (E29) 175 HP, 10 TON Unit 518,403,650 79,212,078
1 3 2 01 01 01 030 PILE DRIVER (E30) 25 HP, 2,5 TON Unit 103,680,215 15,842,337
1 3 2 01 01 01 031 CRANE ON TRACK (E31) 125 HP,35 TON Unit 518,403,650 79,212,078
1 3 2 01 01 01 032 WELDING Set (E32) 40 HP, 250 AMP Unit 25,921,736 3,960,841
1 3 2 01 01 01 033 BORE PILE MACHINE (E33) 150 HP, 2.000 Meters Unit 3,332,589,624 509,219,695
1 3 2 01 01 01 034 VIBRATOR ROLLER 1T (E087) 12 HP, 1 TON Unit 116,655,330 17,824,934

1 3 2 03 01 10 ALAT BENGKEL BERMESIN LAINNYA


4 Stroke, OHC, Air Coled, 98cc, 1.9
1 3 2 03 1 10 001 Mesin Las Listrik Unit 7,552,989 1,154,097
kVA/1900 watt, Sistem Starter : Recoil

ASSET TETAP 1.3. Page 1 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
4 Stroke, Air - Cooled, Side Valve, 1
1 3 2 03 1 10 002 Mesin GenSet Cylinder OHV, 1100 VA (at 50 Hz), Sistem Unit 2,027,674 309,829
Starter : Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 004 Mesin GenSet Cylinder OHV, 1.1 kVA (at 50 Hz), Sistem Unit 2,179,742 333,065
Starter : Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 005 Mesin GenSet Cylinder OHV, 2.3 kVA (at 50 Hz), Sistem Unit 3,391,230 518,180
Starter : Recoil

4 Stroke, 5.5 HP,163 cc Air - Cooled, Side


1 3 2 03 1 10 006 Mesin GenSet Valve, 1 Cylinder OHV, 2.2 kVA (at 50 Unit 3,011,098 460,096
Hz), Sistem Starter : Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 007 Mesin GenSet Cylinder OHV, 5.5 kVA (at 50 Hz), Sistem Unit 6,447,986 985,252
Starter : Recoil/Electric

Single Cylender Vertikal, 4 Stroke, Air -


1 3 2 03 1 10 008 Mesin GenSet Cooled Diesel, 418 cc, 5.5 kVA (at 50 Hz), Unit 11,760,405 1,796,990
Sistem Starter : Recoil/Electric

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 009 Mesin GenSet Cylinder OHV, 6.2 kVA (at 50 Hz), Sistem Unit 7,299,567 1,115,374
Starter : Recoil/Electric

2 Stroke, 0.85 kVA/850 Watt (at 50 Hz),


1 3 2 03 1 10 010 Mesin GenSet Unit 1,094,965 167,311
Sistem Starter : Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 011 Mesin GenSet Cylinder OHV,900 Watt (at 50 Hz), Sistem Unit 2,676,473 408,965
Starter: Recoil
4 Stroke, OHV, 0.8 kVA/800 Watt, Sistem
1 3 2 03 1 10 012 Mesin GenSet Unit 2,331,810 356,301
Starter: Recoil
4 Stroke, Air - Cooled, Side Valve, 1
1 3 2 03 1 10 013 Mesin GenSet Unit 5,069,110 774,560
Cylinder OHV
4 Stroke,1 Cylinder, 0.8 KVA (at 50 Hz),
1 3 2 03 1 10 014 Mesin GenSet Unit 1,723,538 263,357
Sistem Starter: Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 015 Mesin GenSet Cylinder OHV, 2.8 kVA (at 50 Hz), Sistem Unit 3,294,933 503,466
Starter: Electic

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 016 Mesin GenSet Cylinder, 3.8 kVA (at 50 Hz), Sistem Unit 5,353,020 817,941
Starter: Recoil, Electic, Remote Control

2 Stroke, Forced Air - Cooled, 1 Cylinder


1 3 2 03 1 10 017 Mesin GenSet 63 cc, 0.8 kVA/800 Watt (at 50 Hz), Unit 912,408 139,416
Sistem Starter: Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 018 Mesin GenSet Cylinder OHV, 2.8 kVA/800 Watt (at 50 Unit 2,534,593 387,286
Hz), Sistem Starter: Electic

2 Stroke, Air - Cooled, 1 Cylinder 63 cc,


1 3 2 03 1 10 019 Mesin GenSet 0.8 kVA/800 Watt (at 50 Hz), Sistem Unit 887,127 135,553
Starter: Recoil

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 020 Mesin GenSet Cylinder OHV, 5.5 kVA/800 Watt (at 50 Unit 5,576,029 852,017
Hz), Sistem Starter: Recoil/Electric

4 Stroke, Air - Cooled, Side Valve, 1


1 3 2 03 1 10 021 Mesin GenSet Unit 6,082,947 929,474
Cylinder OHV
1 3 2 03 1 10 022 Mesin GenSet 8.8 kVA, 7 kW Unit 90,420,324 13,816,226
1 3 2 03 1 10 023 Mesin GenSet 11 kVA, 8.8 kW Unit 96,407,503 14,731,066
1 3 2 03 1 10 024 Mesin GenSet 13.8 kVA, 11 kW Unit 105,260,955 16,083,874
Yanmar YM14.5, Spec : Yanmar
1 3 2 03 1 10 025 Mesin GenSet 3TNV84T, Stamford PT044G, 16 kVA, Unit 112,982,992 17,263,801
12.8 kW
1 3 2 03 1 10 026 Mesin GenSet 18.6 kVA, 14.9 kW Unit 113,972,981 17,415,071
1 3 2 03 1 10 027 Mesin GenSet 22 kVA, 17.6 kW Unit 125,438,155 19,166,950

ASSET TETAP 1.3. Page 2 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 03 1 10 028 Mesin GenSet 30 kVA, 24 kW Unit 136,582,741 20,869,843
1 3 2 03 1 10 029 Mesin GenSet 37 kVA, 29.6 kW Unit 140,844,494 21,521,039
1 3 2 03 1 10 030 Mesin GenSet 45 kVA, 36 kW Unit 151,442,239 23,140,374
1 3 2 03 1 10 031 Mesin GenSet 54 kVA, 43.2 kW Unit 198,688,980 30,359,676
1 3 2 03 1 10 032 Mesin GenSet 62 kVA, 49.6 kW Unit 211,370,397 32,297,397
1 3 2 03 1 10 033 Mesin GenSet 30 kVA, 24 kW Unit 122,128,733 18,661,270
1 3 2 03 1 10 034 Mesin GenSet 41 kVA, 33 kW Unit 130,982,186 20,014,078
1 3 2 03 1 10 035 Mesin GenSet 48 kVA, 38 kW Unit 137,393,645 20,993,749
1 3 2 03 1 10 036 Mesin GenSet 55 kVA, 44 kW Unit 145,587,055 22,245,702
1 3 2 03 1 10 037 Mesin GenSet 63 kVA, 50 kW Unit 151,131,085 23,092,830
1 3 2 03 1 10 038 Mesin GenSet 94 kVA, 75 kW Unit 177,238,862 27,082,098
1 3 2 03 1 10 039 Mesin GenSet 106 kVA, 85 kW Unit 188,326,922 28,776,354
1 3 2 03 1 10 Mesin GenSet 150 kVA, Unit
(PxLxT) : 1550 x 700 x 1160 mm.
1 3 2 03 1 10 040 Mesin Pemisah Sari Buah Dengan Ampas penggerak : Em 1.5 HP/220V/1PH. Unit 6,994,978 1,068,833
Kapasitas : 80 Kg buah/jam

(PxT) : 1300 x 400 mm. Bahan Tanki :


1 3 2 03 1 10 041 Mesin Pemasak Sirup dengan Pengaduk Stailess Stell. Daya : 125 Watt. Unit 11,944,547 1,825,127
Kapasitas : 20 Liter/proses
1 3 2 03 1 10 042 Mesin Jahit Kulit Kualitas Bagus Unit 2,662,889 406,889
1 3 2 03 1 10 043 Mesin Kelose Kualitas Bagus Unit 12,415,014 1,897,014
1 3 2 03 1 10 044 Mesin Potong Kulit Pandan Kain Kualitas Bagus Unit 2,536,253 387,539
1 3 2 03 1 10 045 Alat Tenun Bukan Mesin (ATBM) Dobi Sutera Unit 8,764,250 1,339,177
1 3 2 03 1 10 046 Hanian Sutera Kualitas Bagus Unit 13,508,319 2,064,071
1 3 2 03 1 10 047 Mesin Jahit Juli Dinamo Besar Unit 4,100,780 626,599
1 3 2 03 1 10 048 Mesin Jahit Singer Lengkap Kualitas Bagus Unit 2,050,466 313,311
1 3 2 03 1 10 049 Mesin Jahit Cangklong Kualitas Bagus Unit 11,964,923 1,828,240
1 3 2 03 1 10 050 Mesin Embos (Pembuat Merek) Kualitas Bagus Unit 11,985,300 1,831,354
1 3 2 03 1 10 051 Mesin DeSet Kualitas Bagus Unit 6,090,871 930,685
1 3 2 03 1 10 052 Mesin Bordir Lengkap Kualitas Bagus Unit 10,022,075 1,531,373
1 3 2 03 1 10 053 Mesin Obras Kualitas Bagus Unit 7,639,022 1,167,243
1 3 2 03 1 10 054 Mesin Sablon Kualitas Bagus Unit 10,942,558 1,672,023
Penggerak : 3+1 HP 380 V 3 PH.
1 3 2 03 1 10 055 Mesin Polis Rotan kecepatan : 8 s/d 12 meter/menit. Uk. Unit 41,519,928 6,344,245
Send belt : 1.300 x 1.850

(PxLxT) : 1600x600x1.040mm. Jumlah


Roll : 9 Pasang. Bahan Roll : Karet. Ukur
(oxL) : 150x50 mm. Daya 7.5 HP/3HP.
1 3 2 03 1 10 056 Mesin Vitrit Rotan Unit 69,951,591 10,688,603
Kapasitas : 42 m/menit. Fungsi :
membelah rotan menjadi rotan kulit/hati
rotan

1 3 2 03 1 10 057 Molen Tanah Liat Kualitas Bagus Unit 25,669,837 3,922,351


Uk : 700x850x800. Gergaji : 30 Inch.
1 3 2 03 1 10 058 Mesin Potong Bambu Unit 14,035,010 2,144,550
Penggerak : Motor Mesin 3.5 HP.
Uk : 625x420x600. Gergaji : 10 Inch.
1 3 2 03 1 10 059 Mesin Potong Bambu Unit 15,854,393 2,422,551
Penggerak : EM 1 HP 220.1 PH

Uk : 62x420x600. lebar Amplas : 150 mm.


1 3 2 03 1 10 060 Mesin Amplas Kombinasi Unit 15,854,393 2,422,551
Penggerak : EM 3/4 HP 220.1 PH

1 3 2 03 1 10 061 Mesin Pemecah Buah Kakao Kualitas Bagus Unit 38,466,643 5,877,703
1 3 2 03 1 10 062 Mesin Pemeras Lendir Buah Kakao Kualitas Bagus Unit 32,595,384 4,980,575
1 3 2 03 1 10 063 Mesin Pengering Biji Kakao Kualitas Bagus Unit 49,325,885 7,536,995
1 3 2 03 1 10 064 Mesin Sortasi Biji Kakao Kualitas Bagus Unit 32,044,166 4,896,349

Uk.700 x 145 x 165. rangka besi. Jlh


bobbin 15 Kg/hr. kapasitas prod.15 Kg/hr.
1 3 2 03 1 10 065 Mc Flosing Unit 23,039,626 3,520,455
penggerak : dynamo 500 watt. sdh
termasuk keranjang plastik kokon 10 Buah

ASSET TETAP 1.3. Page 3 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
Uk.200 x 80 x 120. rangka besi. kapasitas
prod.15 Kg/hr. penggerak : dynamo 500
1 3 2 03 1 10 066 Mc Sortir Kokon Unit 21,926,850 3,350,423
watt. sdh termasuk keranjang plastik
kokon 10 Buah

Uk. 160 x 160 mm. bahan besi. kapasitas


1 3 2 03 1 10 067 Timbangan Digital Kecil Unit 8,646,067 1,321,119
3 Kg. range kesalahan 1 mg

Uk. 580 x 1150 x 106. bahan besi.


1 3 2 03 1 10 068 Timbangan Digital Besar kapasitas 3 Kg. range kesalahan 1 mg. Unit 21,284,014 3,252,197
kontak langsung ke printer

Uk. 100 x 70 x 210. rangka besi siku dan


union 4 cm. badan plat besi. kapasitas
prod : 15 Kg kokon basah/hr. sistim
1 3 2 03 1 10 069 Open/Pengering Kokon Unit 20,171,238 3,082,165
pemanasan sirkulasi udara dan uap panas
tabung minyak tanah 1 Buah kaps. 20 Kg.
rak penyimpanan kokon 1 unit bak kokon

1 3 2 03 1 10 070 Alat Pemasak Kokon Kaps. 50 Liter bahan aluminium Unit 2,868,539 438,313

Delivery : 4 x 2 haspel/ 8 haspel. uk. 180 x


120 x 160. rangka besi siku dan union 4
1 3 2 03 1 10 071 Mc Reeling cm sistim rendam air mengalir. penggerak Unit 34,831,349 5,322,230
dynamo 250 watt termasuk stock haspel 8
Buah. bak penarik ujung benang 1 Buah

Uk.180 x 75 x 100 cm. rangka besi union.


10 mata benang/ gulungan. penggerak
1 3 2 03 1 10 072 Mc Rereeling Unit 11,279,674 1,723,534
dynamo 250 watt.bak perendam benang
haspel 1 Buah berikut rangka besi siku

Uk. 20 x 20 x 60. bahan kayu. rangka besi


1 3 2 03 1 10 073 Packing Benang siku 4 cm. sistim pompa hidrolik. kaps. 20 Unit 3,225,276 492,822
streng/1 Kg/packing

Uk. 800 x 145 x 165. rangka besi jlh


bobbin 80 Buah. kapasitas prod. 15 Kg/hr.
1 3 2 03 1 10 074 Mc Winding/Kelos Benang pengerak dynamo 1.000 watt 1 phase. Unit 53,123,661 8,117,295
(sdh termasuk bobbin backleet 160 Buah.
kincring spuling benang 80 Buah).

Uk. 700 x 145 x 165. rangka besi jlh


bobbin 70 Buah. kapasitas prod. 15 Kg/hr.
1 3 2 03 1 10 075 Mc Doubling/Rangkap Benang pengerak dynamo 1.000 watt 3 phase. Unit 56,868,458 8,689,500
sistim otomatis benang putus (sdh
termasuk bobbin backleet 140 Buah)

Uk. 450 x 140 x 200. rangka besi jlh


spindle 200 Buah. kapasitas prod. 15
1 3 2 03 1 10 076 Mc Twisting/Gintir Benang Kg/hr. pengerak dynamo 2200 watt 3 Unit 51,265,261 7,833,332
phase. (sdh termasuk bobbin backleet 140
Buah. bobbin aluminium 300 Buah).

1 3 2 03 1 10 077 Alat Ukel Uk. 100 x 150 x 100. bahan besi Unit 4,373,371 668,251
1 3 2 03 1 10 078 Alat Relaksasi Pipa Chrom Unit 4,740,900 724,410

Tempat Pengokonan. Hygrothermometer.


1 3 2 03 1 10 079 Alat-alat Pemeliharaan Ulat Sutera Semprotan Tangan. Pisau Box 18,192,920 2,779,878
Pangkas/Gunting. Jaring Pembersih

1 3 2 03 1 10 080 Instar ke-3 Formalin. Kaporit. Kapur Unit 1,785,875 272,882


Bak cuci alat. Pompa air. Selang.
1 3 2 03 1 10 081 Kandang Ulat Buah 23,039,626 3,520,455
semprotan. termometer
1 3 2 03 1 10 082 Gergaji Rotan Kualitas Bagus Buah 76,524 11,693
1 3 2 03 1 10 083 Gunting Rotan Kualitas Bagus Unit 110,032 16,813
1 3 2 03 1 10 084 Hespel Kualitas Bagus Unit 8,835,039 1,349,994

ASSET TETAP 1.3. Page 4 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 03 1 10 085 Reeling Manual Kualitas Bagus Unit 9,234,340 1,411,007
1 3 2 03 1 10 086 Kompresor 1/4 HP Otomatis Unit 2,360,864 360,740
1 3 2 03 1 10 087 Bor 220 Volt Buah 792,908 121,156
1 3 2 03 1 10 088 Mata Pisau Mesin Vitrit Kualitas Bagus Buah 186,708 28,529
1 3 2 03 1 10 089 Rumahan Pisau Vitrit Kualitas Bagus Buah 418,923 64,011
1 3 2 03 1 10 090 Hekter Tembak Kualitas Bagus Liter 702,532 107,347
1 3 2 03 1 10 091 Air Kaca Kualitas Bagus Liter 33,432 5,108
1 3 2 03 1 10 092 HO Kualitas Bagus Unit 33,432 5,108
1 3 2 03 1 10 093 Perajang Ubi Kayu. Besi Unit 142,635 21,795
1 3 2 03 1 10 094 Mesin Kemasan Otomatis (Sealer) Kualitas Bagus Unit 8,308,650 1,269,562
1 3 2 03 1 10 095 Mesin Reeling Manual II P : 1m. L : 1m. T : 1.2m. Kayu. Besi Unit 7,495,407 1,145,298
1 3 2 03 1 10 096 Mesin Reeling Manual I P : 1m. L : 1m. T : 1.2m. Kayu. Besi Unit 8,273,330 1,264,165

1 3 2 03 1 10 097 Mesin Closing P : 80 cm. L : 50 cm. T : 80 cm. Besi Siku Unit 9,863,139 1,507,088

1 3 2 03 1 10 098 Haspel Besi. Kayu Unit 136,522 20,861


1 3 2 03 1 10 099 Alat Perajang Gula Semut Rangka Besi Siku Unit 5,241,781 800,944
1 3 2 03 1 10 100 Mesin Sortasi Gula Semut Rangka Besi Siku Unit 8,517,885 1,301,533
1 3 2 03 1 10 101 Mesin Kristalisasi /Gula Semut Rangka Besi Siku Unit 9,828,320 1,501,767
1 3 2 03 1 10 102 Oven Pengering Gula Semut Rangka Besi Siku Unit 14,414,920 2,202,600
1 3 2 03 1 10 103 Alat Pengemasan /Tinner Injection Kualitas Bagus Unit 3,276,360 500,628
1 3 2 03 1 10 104 Mesin Pengempit Jengkol Kualitas Bagus Unit 8,518,080 1,301,563
1 3 2 03 1 10 105 Gerinda Tangan Kualitas Bagus Unit 5,531,280 845,180
1 3 2 03 1 10 106 Gerinda Duduk Kualitas Bagus Unit 3,160,840 482,976
1 3 2 03 1 10 107 Mesin Amplas Besi Kualitas Bagus Unit 2,370,440 362,203
1 3 2 03 1 10 108 Blower Keong Kualitas Bagus Unit 395,200 60,387
1 3 2 03 1 10 109 Mesin Kompresor ½ HP Uk. 1/2 HP Unit 3,160,840 482,976
1 3 2 03 1 10 110 Mesin Oven Gula Semut Kualitas Bagus Unit 14,222,640 2,173,219
1 3 2 03 1 10 111 Wajan Stainless Stainless Steel Unit 2,370,440 362,203
1 3 2 03 1 10 112 Mesin Penepung Kopi Kualitas Bagus Unit 12,168,360 1,859,325
1 3 2 03 1 10 113 Mesin Penepung Kopi Kualitas Bagus Unit 18,410,240 2,813,085
1 3 2 03 1 10 114 Mesin kemasan (sealer) Otomatis Unit 10,932,434 1,670,476
1 3 2 03 1 10 115 Mesin kemasan (sealer) Hand Manual Unit 1,200,000 183,360
1 3 2 03 1 10 116 Mesin Penyangrai Kopi (Roasting) Stainless Steel Kapasitas 1 Kg Unit 30,000,000 4,584,000
1 3 2 03 1 10 117 Mesin Pemotong Keripik Otomatis Unit 5,000,000 764,000
1 3 2 03 1 10 118 Mesin Pemotong Keripik Manual 1,000,000 152,800
1 3 2 03 1 10 119 Mesin giling (grinder) Kopi Kapasitas 1 Kg Unit 10,200,000 1,558,560
1 3 2 03 1 10 120 Mesin Cetak Bata Merah Diesel Unit 45,000,000 6,876,000
1 3 2 03 1 10 121 Gerinda Daya : 670 Watt 1.100 rpm Unit 700,000 106,960
1 3 2 03 1 10 122 Landasan / Paron Pandai Besi Bahan Besi Baja Unit 3,000,000 458,400

1 3 2 04 ALAT PERTANIAN
1 3 2 04 01 ALAT PENGOLAHAN
1 3 2 04 01 01 ALAT PENGOLAHAN TANAH DAN TANAMAN
1 3 2 04 01 01 001 Handsprayer Robin Cap Stainles 14 Liter Unit 438,480 67,000
1 3 2 04 01 01 002 Handsprayer Swan Kap Stainles 14 Liter Unit 501,120 76,571
1 3 2 04 01 01 003 Handsprayer Plastik Solo Kap 14 Liter Unit 413,400 63,168
1 3 2 04 01 01 004 Hand Sprayer Solo Kap Plastik Solo Kap 2 Liter Unit 50,160 7,664
1 3 2 04 01 01 005 Hand Sprayer Solo Kap (10 Liter) Stainless Unit 949,700 145,114
1 3 2 04 01 01 006 Hand Sprayer Solo Kap (12 Liter) Stainless Unit 1,371,600 209,580
1 3 2 04 01 01 007 Hand Sprayer Solo Kap (14 Liter) Stainless Unit 1,567,500 239,514
1 3 2 04 01 01 008 Hand Sprayer Solo Kap (10 Liter) Unit 805,320 123,053
1 3 2 04 01 01 009 Hand Sprayer Solo Kap (12 Liter) Unit 920,280 140,619
1 3 2 04 01 01 010 Hand Sprayer Solo Kap (14 Liter) Unit 1,150,440 175,787
1 3 2 04 01 01 011 Hand Sprayer Elektrik (16 Liter) Unit 600,000 91,680
1 3 2 04 01 01 012 Mesin Pengupas Kopi Merah Kualitas Bagus Unit 1,002,240 153,142
1 3 2 04 01 01 013 Mesin Pompa Jet Pump Kualitas Bagus Unit 350,000 53,480
1 3 2 04 01 01 014 Selang  50 meter gulung 500,000 76,400
1 3 2 04 01 01 015 Cangkul Cap Ayam buah 70,000 10,696

ASSET TETAP 1.3. Page 5 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 04 01 01 016 Cangkul Cap Buaya buah 85,000 12,988
1 3 2 04 01 01 017 Gagang Cangkul Kayu buah 15,000 2,292
1 3 2 04 01 01 018 Garu Besi buah 50,000 7,640
1 3 2 04 01 01 019 Sabit Bergerigi Gagang Kayu buah 98,640 15,072
1 3 2 04 01 01 020 Traktor Mini Roda 4 14 HP Unit 386,287,080 59,024,666
1 3 2 04 01 01 021 Cultivator 550 W Unit 50,957,040 7,786,236
1 3 2 04 01 01 022 Taxi Pump 3,5EY Unit 21,369,120 3,265,202
1 3 2 04 01 01 023 Seed Clear Kualitas Bagus Unit 39,450,600 6,028,052
1 3 2 04 01 01 024 Alat Pembuat Pupuk Organik (APPO) 8,5 HP Unit 44,382,000 6,781,570
1 3 2 04 01 01 025 Alat Pembuat Pupuk Organik (APPO) (Khusus Jerami) 7 HP Diesel Unit 17,758,440 2,713,490
1 3 2 04 01 01 026 Alat Pembuat Pupuk Organik (APPO) 8,5 HP Biasa Unit 28,936,800 4,421,543
1 3 2 04 01 01 027 Alat Pembuat Pupuk Organik (APPO) 11 HP Biasa Unit 38,616,120 5,900,543
1 3 2 04 01 01 028 Kompas Kualitas Bagus Unit 307,440 46,977
1 3 2 04 01 01 029 Sepatu Boot Kualitas Biasa Unit 125,000 19,100
1 3 2 04 01 01 030 Sepatu Boot Kualitas Bagus Unit 425,160 64,964
1 3 2 04 01 01 031 Termometer Derajat Celcius Unit 55,920 8,545
1 3 2 04 01 01 032 Sepatu Kebun Ladam Tapak Kuda Sepasang 25,000 3,820
1 3 2 04 01 01 033 Sepatu Kebun Kualitas Bagus Sepasang 113,700 17,373
1 3 2 04 01 01 034 Goni Plastik Plastik Lembar 2,500 382
1 3 2 04 01 01 035 Rumah Pompa Uk. 2x3 m beton Unit 18,536,280 2,832,344
1 3 2 04 01 01 036 Emposan manual Unit 698,520 106,734
1 3 2 04 01 01 037 Pedal Saler (packing benih) 450 mm max length Unit 14,062,176 2,148,700
1 3 2 04 01 01 038 Soil Kit Digital Unit 27,697,920 4,232,242
1 3 2 04 01 01 039 Kompor Tembak Kualitas Bagus Unit 745,800 113,958
1 3 2 04 01 01 040 Gembor 10 Liter (Kaleng) Unit 37,560 5,739
1 3 2 04 01 01 041 Gembor 15 Liter (Kaleng) Unit 56,400 8,618
1 3 2 04 01 01 042 Gembor 10 Liter (Plastik) Unit 75,120 11,478
1 3 2 04 01 01 043 Gunting Pangkas Kualitas Bagus Buah 68,300 10,436
1 3 2 04 01 01 044 Dodos Kualitas Bagus Buah 75,200 11,491
1 3 2 04 01 01 045 Pisau Okulasi Kualitas Bagus Buah 62,600 9,565
1 3 2 04 01 01 046 Plastik Okulasi Bahan Plastik Gulung 462,300 70,639
1 3 2 04 01 01 047 Alat Pengukur Sadapan Kualitas Bagus Buah 617,800 94,400
1 3 2 04 01 01 048 Gergaji Cabang Kualitas Bagus Buah 90,000 13,752
1 3 2 04 01 01 049 Pisau Deres Kualitas Bagus Buah 31,300 4,783
1 3 2 04 01 01 050 Batu Asah Deres Bahan Batu Buah 31,300 4,783
1 3 2 04 01 01 051 Mankok Latex Kecil 100 ml Plastik Buah 600,000 91,680
1 3 2 04 01 01 052 Mankok Latex Sedang 250 ml Plastik Buah 900,000 137,520
1 3 2 04 01 01 053 Mankok Latex Besar 500 ml Plastik Buah 1,200 183
Stanless Steel, model vertikal, voltage 220
1 3 2 04 01 01 054 Mesin Sealer (Pengemas Produk) Unit 9,000,000 1,375,200
V/50Hz
1 3 2 04 01 01 055 Mesin/Alat label harga produk Kualitas Bagus Unit 1,250,000 191,000
1 3 2 04 01 01 056 Traktor Tangan Quick Type Bajak Singkal 9 HP Unit 21,826,800 3,335,135
1 3 2 04 01 01 057 Traktor Tangan Quick Type Bajak Singkal 6,5 HP dengan perlengkapan standard Unit 28,450,950 4,347,305
1 3 2 04 01 01 058 Traktor Tangan Quick Type Bajak Singkal 6,5 HP Unit 29,663,550 4,532,590

1 3 2 04 01 01 059 Traktor Tangan Quick Type Bajak Singkal 8,5 HP dengan Perlengkapan Standard Unit 32,953,050 5,035,226

1 3 2 04 01 01 060 Traktor Tangan Quick Type Bajak Singkal 8,5 HP Unit 34,771,950 5,313,154
1 3 2 04 01 01 061 Traktor Tangan Quick Type Rotary : 11 HP Unit 50,617,020 7,734,281
1 3 2 04 01 01 062 Corn - Sheller 8,5 HP Type Biasa Unit 19,525,000 2,983,420
1 3 2 04 01 01 063 Corn - Sheller 8,5 HP Type Khusus Unit 19,745,000 3,017,036
1 3 2 04 01 01 064 Power Thresher Group 6,0 HP Vertikal E- Diesel Unit 27,773,700 4,243,821
1 3 2 04 01 01 065 Power Thresher 6,5 HP Type Biasa/ Diesel Unit 23,832,750 3,641,644
1 3 2 04 01 01 066 Power Thresher 6,5 HP Type Biasa/ Diesel Unit 23,897,250 3,651,500
Model TH-6 MG + RD-65 DI-2S (6,5 HP)
1 3 2 04 01 01 067 Power Thresher Unit 24,193,950 3,696,836
Type Khusus/ Diesel
1 3 2 04 01 01 068 Seed Cleaner 6,5 HP Type Biasa Unit 34,281,750 5,238,251

ASSET TETAP 1.3. Page 6 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 04 01 01 069 Seed Cleaner 6,5 HP Type Biasa Unit 34,733,250 5,307,241
1 3 2 04 01 01 070 Tanikaya Brand APPO (Alat Pembuat Pupuk Organik) 8,5 HP Type Biasa Unit 33,520,650 5,121,955
1 3 2 04 01 01 071 Tanikaya Brand APPO (Alat Pembuat Pupuk Organik) 11 HP Type Biasa Unit 43,995,450 6,722,505
1 3 2 04 01 01 072 "Products Disk Mill (Mesin Penghancur Biji bijian) 6,5 HP dengan Radiator Unit 21,510,750 3,286,843
1 3 2 04 01 01 073 Products Disk Mill (Mesin Penghancur Bijibijian) 8,5 HP dengan Radiator Unit 24,961,500 3,814,117
1 3 2 04 01 01 074 Products Disk Mill (Mesin Penghancur Bijibijian) 14 HP dengan Hopper Unit 21,510,750 3,286,843
1 3 2 04 01 01 075 Pompa Air 6,5 HP dengan Perlengkapan Standard Unit 23,529,600 3,595,323
1 3 2 04 01 01 076 Pompa Air 6,5 HP dengan Perlengkapan Standard Unit 25,077,600 3,831,857
1 3 2 04 01 01 077 Pompa Air 8,5 HP dengan Perlengkapan Standard Unit 29,070,150 4,441,919
1 3 2 04 01 01 078 Pompa Air 11 HP dengan Perlengkapan Standard Unit 35,197,650 5,378,201
1 3 2 04 01 01 079 Pompa Air 11 HP dengan Perlengkapan Standard Unit 41,447,700 6,333,209
1 3 2 04 01 01 080 Pompa Air 14 HP dengan Perlengkapan Standard Unit 49,594,050 7,577,971
Intan-4 (4x4") + 8,5 HP + 2000 RPM + 1,8
1 3 2 04 01 01 081 Pompa Air Sentrifugasi dengan Efisiensi Tinggi Unit 26,154,750 3,996,446
T/Min
Intan-6 (6x6") + 14 HP + 1800 RPM + 3,6
1 3 2 04 01 01 082 Pompa Air Sentrifugasi dengan Efisiensi Tinggi Unit 43,666,500 6,672,241
T/Min
Intan-8 (8x8") + 14 HP + 1700 RPM + 4
1 3 2 04 01 01 083 Pompa Air Sentrifugasi dengan Efisiensi Tinggi Unit 50,890,500 7,776,068
T/Min
Intan-10 (10x10") + 29 HP + 2000 RPM +
1 3 2 04 01 01 084 Pompa Air Sentrifugasi dengan Efisiensi Tinggi Unit 97,685,250 14,926,306
6 T/Min
1 3 2 04 01 01 085 "Satake" Brand ( One Pass System Rice Milling Unit) 29 HP (Engine Vertikal 4- Piston) Set 115,390,500 17,631,668
1 3 2 04 01 01 086 Pompa Air Uk. 2" Unit 22,439,550 3,428,763
1 3 2 04 01 01 087 Pompa Air Uk. 3" Unit 22,888,470 3,497,358
1 3 2 04 01 01 088 Pompa Air Uk. 4" Unit 23,994,000 3,666,283
1 3 2 04 01 01 089 Pompa Air Uk. 4" dengan mesin diesel Unit 25,695,510 3,926,274
1 3 2 04 01 01 090 Pompa Air Uk. 6" Unit 31,089,000 4,750,399
1 3 2 04 01 01 091 Pompa Air Uk. 6" dengan mesin diesel Unit 44,450,820 6,792,085
1 3 2 04 01 01 092 Cultivator Cakar Baja Mini Unit 387,000 59,134
1 3 2 04 01 01 093 Cultivator Blade Mini Unit 645,000 98,556
1 3 2 04 01 01 094 Cultivator Cakar Baja Unit 891,390 136,204
1 3 2 04 01 01 095 Cultivator Cakar Baja Unit 905,580 138,373
1 3 2 04 01 01 096 Cultivator Blade Mini Unit 1,225,500 187,256
1 3 2 04 01 01 097 Cultivator Blade Mini Unit 1,389,330 212,290
1 3 2 04 01 01 098 Chopper Pencacah Baja, Unit 9,030,000 1,379,784
1 3 2 04 01 01 099 Chopper Pencacah Baja, Unit 11,794,470 1,802,195
1 3 2 04 01 01 100 Chopper Pencacah Baja, Unit 14,766,630 2,256,341
1 3 2 04 01 01 101 Combine Harvester Bahan Baja Unit 103,200,000 15,768,960
1 3 2 04 01 01 102 Combine Harvester 8,5 HP (Engkol/ Starter) Unit 108,360,000 16,557,408
1 3 2 04 01 01 103 Combine Harvester 8,5 HP (Elektrik/ Starter) Unit 112,230,000 17,148,744
1 3 2 04 01 01 104 Mesin Tanam Padi Transplanter Unit 65,790,000 10,052,712
1 3 2 04 01 01 105 Mesin Tanam Padi Transplanter Unit 65,790,000 10,052,712
1 3 2 04 01 01 106 Mesin Tanam Padi Transplanter Unit 70,950,000 10,841,160
1 3 2 04 01 01 107 Mesin Tanam Padi Transplanter Unit 71,897,892 10,985,998
1 3 2 04 01 01 108 Mesin Tanam Padi Transplanter Unit 73,143,000 11,176,250
1 3 2 04 01 01 109 Mesin Tanam Padi Transplanter Unit 75,465,000 11,531,052
1 3 2 04 01 01 110 Mesin Tanam Padi Transplanter Unit 77,400,000 11,826,720
1 3 2 04 01 01 111 Mesin Tanam Padi Transplanter Unit 83,076,000 12,694,013
1 3 2 04 01 01 112 Rice Milling Unit 19 HP Unit 45,919,421 7,016,488
1 3 2 04 01 01 113 Rice Milling Unit 19 HP Unit 54,857,250 8,382,188
1 3 2 04 01 01 114 Handsprayer 15 Liter Unit 357,330 54,600
1 3 2 04 01 01 115 Handsprayer 14 Liter Unit 406,350 62,090
1 3 2 04 01 01 116 Handsprayer 14 Liter Unit 425,700 65,047
1 3 2 04 01 01 117 Handsprayer 14 Liter Unit 548,250 83,773
1 3 2 04 01 01 118 Handsprayer 14 Liter Buah 668,220 102,104
1 3 2 04 01 01 119 Handsprayer 17 Liter Buah 774,000 118,267
1 3 2 04 01 01 120 Ajir Kualitas Bagus Buah 8,127 1,242
1 3 2 04 01 01 121 Pisau Kualitas Bagus Buah 170,280 26,019

ASSET TETAP 1.3. Page 7 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 04 01 01 122 Polibag 20x30 cm Lembar 1,806 276
1 3 2 04 01 01 123 Polibag 18x25 cm Lembar 1,161 177
1 3 2 04 01 01 124 Polibag 25x40 cm Lembar 3,741 572

1 3 2 04 01 01 125 Polibag 15 x 21 cm dan 14 x 22 cm Lembar 500,000 76,400

1 3 2 04 01 01 126 Polibag 17 x 35 cm Lembar 700,000 106,960


1 3 2 04 01 01 127 Kereta Sorong Kualitas Bagus Unit 606,042 92,603
1 3 2 04 01 01 128 Caplak Kualitas Bagus Buah 637,002 97,334
1 3 2 04 01 01 129 Garpu Kualitas Bagus Buah 161,637 24,698
1 3 2 04 01 01 130 Sabit Kualitas Bagus Buah 42,441 6,485
1 3 2 04 01 01 131 Selang Buang (Selang Output) per meter 2 Inchi Meter 16,512 2,523
1 3 2 04 01 01 132 Selang Buang (Selang Output) per meter 3 Inchi Meter 27,348 4,179
1 3 2 04 01 01 133 Selang Buang (Selang Output) per meter 4 Inchi Meter 35,346 5,401
1 3 2 04 01 01 134 Selang Buang (Selang Output) per meter 6 Inchi Meter 55,212 8,436
1 3 2 04 01 01 135 Selang Buang (Selang Output) per meter 8 Inchi Meter 97,524 14,902
1 3 2 04 01 01 136 Selang Isap (selang input) 6 m 2 Inchi Meter 52,632 8,042
1 3 2 04 01 01 137 Selang Isap (selang input) 6 m 3 Inchi Meter 103,200 15,769
1 3 2 04 01 01 138 Selang Isap (selang input) 6 meter 4 Inchi Meter 131,064 20,027
1 3 2 04 01 01 139 Selang Isap (selang input) 6 meter 6 Inchi Meter 267,288 40,842
1 3 2 04 01 01 140 Selang Isap (selang input) 6 meter 8 Inchi Meter 458,079 69,994
1 3 2 04 01 01 141 Moisture Tester Digital Unit 6,222,057 950,730
1 3 2 04 01 01 142 Mesin Jahit Karung Kualitas Bagus Unit 2,686,812 410,545
1 3 2 04 01 01 143 Timbangan Digital Digital Unit 11,666,373 1,782,622
1 3 2 04 01 01 144 Timbangan Duduk Kualitas Bagus Unit 3,703,590 565,909
1 3 2 04 01 01 145 Goni 15 Kg c/w handling Uk. 15 Kg Buah 3,483 532
1 3 2 04 01 01 146 Karung Kualitas Bagus Buah 6,192 946
1 3 2 04 01 01 147 Lalandak Kualitas Bagus Buah 369,069 56,394
1 3 2 04 01 01 148 Gunting Stek, SKT Kualitas Bagus Buah 84,882 12,970
1 3 2 04 01 01 149 Terpal Plastik 8x8m Buah 1,493,304 228,177
1 3 2 04 01 01 150 Terpal Plastik 10 x 8 m Buah 1,866,630 285,221

1 3 2 04 01 01 151 Soil Test Kit 4 Parameter NPK Khusus Tanah Buah 2,644,371 404,060

1 3 2 04 01 01 152 Soil Moisture meter Ph Analog Buah 1,484,790 226,876


1 3 2 04 01 01 153 Soil pH Analog Buah 1,237,368 189,070
1 3 2 04 01 01 154 Pot Plastik Bahan Plastik Buah 21,930 3,351
1 3 2 04 01 01 155 Paddy Reaper Kualitas Bagus Unit 40,301,793 6,158,114
1 3 2 04 01 01 156 Paddy Mower Kualitas Bagus Unit 7,777,539 1,188,408
1 3 2 04 01 01 157 Mesin Pompa Biasa Kualitas Bagus Unit 494,973 75,632
1 3 2 04 01 01 158 Mesin Pompa Jet Pump DAB 30 Meter Unit 417,444 63,785
1 3 2 04 01 01 159 Water Pump 3,5 HP Unit 7,211,874 1,101,974
1 3 2 04 01 01 160 Mesin Pemotong Rumput (Mist Blower) Kapasitas 20 Ltr Unit 2,828,196 432,148
1 3 2 04 01 01 161 Mesin Pemotong Rumput (Power Spayer) Kualitas Bagus Unit 6,999,798 1,069,569
1 3 2 04 01 01 162 Mesin Pemotong Rumput/Bruss Cutter Kualitas Bagus Unit 2,474,736 378,140
1 3 2 04 01 01 163 Dryer 8 HP Unit 95,451,615 14,585,007
1 3 2 04 01 01 164 Bed Dryer Auto Moxer 16 HP Unit 278,577,306 42,566,612
1 3 2 04 01 01 165 Mesin Genset 6,5 HP Unit 2,969,580 453,752
1 3 2 04 01 01 166 Mesin Las Listrik Kualitas Bagus Unit 1,555,482 237,678
1 3 2 04 01 01 167 Mesin Las Karbit Kualitas Bagus Unit 4,666,575 713,053
1 3 2 04 01 01 168 Mesin Dinamo Listrik Kualitas Bagus Unit 2,121,147 324,111
1 3 2 04 01 01 169 Mesin Gerenda Kualitas Bagus Unit 3,535,245 540,185
1 3 2 04 01 01 170 Mesin Bor Kualitas Bagus Unit 353,589 54,028
1 3 2 04 01 01 171 Mesin Bor Kualitas Bagus Unit 268,707 41,058
1 3 2 04 01 01 172 Tabung Karbit Kualitas Bagus Unit 1,866,630 285,221
1 3 2 04 01 01 173 Bor tanah mesin/ earth auger Kualitas Bagus Unit 4,030,218 615,817

ASSET TETAP 1.3. Page 8 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 04 01 01 174 Mesin pemotong rumput dorong Kualitas Bagus Unit 6,646,209 1,015,541
1 3 2 04 01 01 175 Bagan warna daun Kualitas Bagus Buah 77,658 11,866
1 3 2 04 01 01 176 Penakar curah hujan Kualitas Bagus Buah 4,030,218 615,817
1 3 2 04 01 01 177 Light Trap Kualitas Bagus Buah 3,888,834 594,214
1 3 2 04 01 01 178 Aspirator, penangkap nyamuk Serangga Kualitas Bagus Buah 1,166,676 178,268
1 3 2 04 01 01 179 Meja Stainless Produksi Stainless Unit 7,407,180 1,131,817
1 3 2 04 01 01 180 Tungku keramik Keramik Unit 4,713,660 720,247
1 3 2 04 01 01 181 Kuali Stainless Diameter 90 cm Dia 90 cm Unit 3,703,590 565,909
1 3 2 04 01 01 182 Panci Stainless 60 liter pake kran 60 Liter Unit 5,050,350 771,693
1 3 2 04 01 01 183 Nampan Stainless Stainless Unit 4,545,315 694,524
1 3 2 04 01 01 184 Oven Kapasitas 100 kg Kapasitas 100 Kg Unit 10,437,390 1,594,833
1 3 2 04 01 01 185 Lori Dorong Stainless 6 rak Stainless 6 Rak Unit 4,848,336 740,826
1 3 2 04 01 01 186 Sendok Goreng Stainless Stainless Unit 33,669 5,145
1 3 2 04 01 01 187 Alat Penyaring Kualitas Bagus Unit 4,713,660 720,247
1 3 2 04 01 01 188 Sendok Kayu Panjang 125 cm Uk. 125 cm Unit 101,007 15,434
1 3 2 04 01 01 189 Tabung gas 12 kg Uk. 12 Kg Unit 1,683,450 257,231
1 3 2 04 01 01 190 Kompor gas Kualitas Bagus Buah 1,010,070 154,339
1 3 2 04 01 01 191 Ember plastik isi 25 liter Isi 25 Liter Buah 101,007 15,434
1 3 2 04 01 01 192 Gayung stainless Stainless Buah 134,676 20,578
1 3 2 04 01 01 193 Jepitan Penggoreng Stainless Stainless Buah 60,630 9,264
1 3 2 04 01 01 194 Botol sirup kecil 500 ml Uk. 500 ml Buah 2,322 355
1 3 2 04 01 01 195 Botol sirup kecil 330 ml Uk. 500 ml Buah 7,353 1,124
1 3 2 04 01 01 196 Mulsa Plastik Uk. 150 m/Gulung Gulung 235,000 35,908
1 3 2 04 01 01 197 Mulsa Plastik Uk. 250 m/Gulung Gulung 300,000 45,840
1 3 2 04 01 01 198 Mulsa Plastik Uk. 250 m/Gulung Gulung 300,000 45,840
1 3 2 04 01 01 199 Scop Kualitas Bagus Unit 50,000 7,640
1 3 2 04 01 01 200 Polybag Uk. 1/2 kg Kg 22,000 3,362
1 3 2 04 01 01 201 Polybag Uk. 1 kg Kg 23,000 3,514
1 3 2 04 01 01 202 Karung Volume 50 Kg Lembar 3,000 458
KEHUTANAN
1 3 2 04 01 01 203 Pal Beton Uk 15x15x120 cm Buah 300,312 45,888
1 3 2 04 01 01 204 Stup Lebah Stup Buah 1,206,150 184,300
1 3 2 04 01 01 205 Kotak Stup Lebah Kualitas Bagus Buah 44,634 6,820
1 3 2 04 01 01 206 Centripugal/Ekstraktor Kualitas Bagus Buah 2,538,849 387,936
1 3 2 04 01 01 207 Smoker Kualitas Bagus Buah 1,192,605 182,230
1 3 2 04 01 01 208 Madu Kualitas Bagus Botol 119,325 18,233
1 3 2 04 01 01 209 Sirup Penjinak Lebah Kualitas Bagus Botol 22,962 3,509
1 3 2 04 01 01 210 Tes Kadar Air Kualitas Bagus Buah 4,569,954 698,289
1 3 2 04 01 01 211 Pondasi Sarang Kualitas Bagus Lembar 12,642 1,932
1 3 2 04 01 01 212 Masker Baju Kualitas Bagus Buah 118,422 18,095
1 3 2 04 01 01 213 Grafing/Penangkaran Madu Kualitas Bagus Set 287,799 43,976
1 3 2 04 01 01 214 Alat Panen Beefolen Kualitas Bagus Set 287,799 43,976
1 3 2 04 01 01 215 Pengungkit Sarang Kualitas Bagus Set 28,767 4,396
1 3 2 04 01 01 216 Sikat Lebah Kualitas Bagus Buah 45,666 6,978
1 3 2 04 01 01 217 Standar/Tiang Kotak Kualitas Bagus Set 253,872 38,792
1 3 2 04 01 01 218 Modem Bem Kualitas Bagus Buah 11,810,337 1,804,619
1 3 2 04 01 01 219 Haga Altimeter Kualitas Bagus Buah 28,207,140 4,310,051
1 3 2 04 01 01 220 Scale Stik Kualitas Bagus Buah 286,767 43,818
1 3 2 04 01 01 221 Lup Skala 20 x 1 Buah 1,797,873 274,715
1 3 2 04 01 01 222 Kapur Crayon Bahan crayon Buah 300,312 45,888
1 3 2 04 01 01 223 GPS Map Digital Buah 13,988,889 2,137,502
1 3 2 04 01 01 224 GPS Map Digital Buah 15,135,570 2,312,715
1 3 2 04 01 01 225 Printhead Ploter Kualitas Bagus Buah 1,548,000 236,534
1 3 2 04 01 01 226 Catridge Plotter Kualitas Bagus Buah 1,290,000 197,112

ASSET TETAP 1.3. Page 9 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 04 01 01 227 Kertas Plotter Kualitas Bagus Roll 580,500 88,700
1 3 2 04 01 02 ALAT PEMELIHARAAN TANAMAN/IKAN/TERNAK
1 3 2 04 01 03 ALAT PANEN

1 3 2 04 01 04 ALAT PENYIMPAN HASIL PERCOBAAN PERTANIAN

1 3 2 04 01 05 ALAT LABORATORIUM PERTANIAN


1 3 2 04 01 05 001 Pestisida Tes Kit/Rapid Tes (Analisa Pangan) Unit 15,000,000 2,292,000
1 3 2 04 01 05 002 Boraks Tes Kit/Rapid Tes (Analisa Pangan) Unit 15,000,000 2,292,000
1 3 2 04 01 05 003 Formalin Tes Kit (Analisa Pangan) Unit 15,000,000 2,292,000

1 3 2 04 01 06 ALAT PROSESING
1 3 2 04 01 07 ALAT PASCA PANEN
1 3 2 04 01 08 ALAT PRODUKSI PERIKANAN
Measurement range : brix 0,0 to 85 % ,
1 3 2 04 01 08 001 Refraktometer temperature 9,0 to 99,9 C, Sample volume Buah 7,224,000 1,103,827
: 0, 3 ml
1 3 2 04 01 08 002 pH paper (Kertas pH) Pita Indikator 0-14 isi 100 strip Lembar 260,064 39,738

Range 0.00 to 20.00 mg/L ( ppm );


Resolution 0.01 g/L (ppm) ; Accuracy +/-
1 3 2 04 01 08 003 DO Meter 1,5 % FS% Saturation : Range 0.0 to Buah 15,965,040 2,439,458
200.0 % ; Resolution 0.1 % ; Accuracy +/-
1.5 % FS

1 3 2 04 01 08 004 Kakaban 100x60x10 cm Buah 31,786 4,857


1 3 2 04 01 08 005 Hapa 2x3x1 m Buah 577,920 88,306
1 3 2 04 01 08 006 Jala Bahan Benang pjg 2 m Buah 650,160 99,344
1 3 2 04 01 08 007 Waring 1x1 m Buah 43,344 6,623
1 3 2 04 01 08 008 Aquarium 90x40x40 Cm Buah 505,680 77,268
1 3 2 04 01 08 009 Alas Aquarium Karet Sintetis 1-2 Cm Lembar 21,672 3,311
1 3 2 04 01 08 010 Rak Aquarium Besi Siku utk 4 aquarium Unit 866,880 132,459
1 3 2 04 01 08 011 Batu Aerasi Uk, 3-5 Cm Set 43,344 6,623
1 3 2 04 01 08 012 Batu Aerasi Uk, 5-8 Cm Set 72,240 11,038
1 3 2 04 01 08 013 Aerator Aquarium Kualitas Bagus buah 288,960 44,153
1 3 2 04 01 08 014 Silicon (Lem Aquarium) Silikon Botol 166,152 25,388
1 3 2 04 01 08 015 Jangkar Besi Berat 20 Kg Buah 1,017,139 155,419
1 3 2 04 01 08 016 Gear Box Reduction D 4 Cm Unit 9,391,200 1,434,975
1 3 2 04 01 08 017 Stern Tube D 4 Cm Meter 1,186,181 181,248
1 3 2 04 01 08 018 Besi Putih D 3 Cm Meter 579,365 88,527
1 3 2 04 01 08 019 Pompa Keong D 2" Unit 614,040 93,825
1 3 2 04 01 08 020 Baju Renang Vinyl Unit 433,440 66,230
1 3 2 04 01 08 021 Paku Kapal Galvanis Kg 57,792 8,831
1 3 2 04 01 08 022 Tali Kapal Rami / goni Kg 650,160 99,344
1 3 2 04 01 08 023 Kompas Marine Unit 3,473,299 530,720
1 3 2 04 01 08 024 Jala Benang Nylon Buah 722,544 110,405
1 3 2 04 01 08 025 Tali Polyethylen D 12 mm Kg 73,974 11,303
1 3 2 04 01 08 026 Tali Polyethylen D 9 mm Kg 70,940 10,840
1 3 2 04 01 08 027 Tali Polyethylen D 7 mm Kg 62,632 9,570
1 3 2 04 01 08 028 Jaring Insang Ikan (100x100) Uk. 1 3/4", Uk. Benang 0,15 Set 231,168 35,322
1 3 2 04 01 08 029 Jaring Insang Ikan (100x100) Uk. 2 1/4", Uk. Benang 0,18 Set 231,168 35,322
1 3 2 04 01 08 030 Jaring Polyethylen 380 / 9 Uk, 2 Inchi Meter 101,136 15,454
1 3 2 04 01 08 031 Jaring Polyethylen 380 / 9 Uk, 1 3/4 Meter 101,136 15,454
1 3 2 04 01 08 032 Jaring Polyethylen 380 / 9 Uk, 1 1/2 Meter 108,360 16,557
1 3 2 04 01 08 033 Jaring Polyethylen 380 / 9 Uk, 1 Inchi Meter 108,360 16,557
1 3 2 04 01 08 034 Jaring Polyethylen 380 / 9 Uk, 3/4 Inchi Meter 108,360 16,557
1 3 2 04 01 08 035 Jaring Polyethylen 380 / 9 Uk, 1/2 Inchi Meter 108,360 16,557
1 3 2 04 01 08 036 Benang Polyethylen Uk 1 1/2" Kg 108,360 16,557
1 3 2 04 01 08 037 Benang Polyethylen Uk 1 3/4" Kg 101,136 15,454
1 3 2 04 01 08 038 Pemberat Rantai Bahan Timah Kg 209,496 32,011
1 3 2 04 01 08 039 Drum Plastik Volume 200 liter Buah 505,680 77,268
1 3 2 04 01 08 040 Drum Besi Volume 200 liter Buah 577,920 88,306

ASSET TETAP 1.3. Page 10 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 04 01 08 041 Hi Blower 40 Titik 40 titik Buah 1,986,600 303,552
1 3 2 04 01 08 042 Hi Blower 60 Titik 60 titik Buah 2,745,120 419,454
1 3 2 04 01 08 043 Tabung Oksigen Kapasitas 12 Kg Buah 1,950,480 298,033
1 3 2 04 01 08 044 Tabung Oksigen Kapasitas 25 Kg Buah 3,106,320 474,646
1 3 2 04 01 08 045 Tabung Oksigen Kapasitas 50 Kg Buah 5,237,400 800,275
Power Motor 16-20 Hp; kapasitas 200-
1 3 2 04 01 08 046 Mesin Pencetak Pellet Unit 43,344,000 6,622,963
300kg/jam; bahan plat
1 3 2 04 01 08 047 Gerobak/Kereta Sorong Kualitas Bagus Unit 606,816 92,721
1 3 2 04 01 08 048 Sepatu Boot Lapangan Bahan Karet Sintetis Pasang 186,341 28,473
1 3 2 04 01 08 049 Cangkul Bahan Plat/Besi + Gagang Buah 151,704 23,180

1 3 2 04 01 08 050 Babat Bahan Plat/Besi + Gagang Buah 57,792 8,831

1 3 2 04 01 08 051 Garpu Tangan Bahan Plat/Besi + Gagang Buah 132,922 20,310

1 3 2 04 01 08 052 Plankton Net Uk. 10-15 meter Buah 289,104 44,175


1 3 2 04 01 08 053 Power Spayer Kualitas Bagus Buah 1,517,040 231,804
1 3 2 04 01 08 054 Altimeter Kualitas Bagus Buah 9,391,200 1,434,975
1 3 2 04 01 08 055 Cooker Presto/ Alat Perebusan Ikan isi 50 Liter Unit 6,501,600 993,444

Spesifikasi: Uk. Pj 100x L.55x T.165 cm;


Ukuran Rangka 3x3 cm, Tebal 1 mm;
1 3 2 04 01 08 056 Alat (Oven) Pengasapan Ikan Unit 11,558,400 1,766,124
Jumlah Rak 4 buah berlapis, Uk. 100 x 5
cm diameter 4 mm bahan Stainless Steel

Spesifikasi: Uk. Pj 120x L.60x T.80 cm;


Ukuran Rangka 3x3 cm, Tebal 1 mm; Plat
1 3 2 04 01 08 057 Meja Preparasi/ Pembersihan Ikan Unit 2,311,680 353,225
meja stainless steel, tebal 1 mm bahan
Stainless Steel

Uk. Diameter 50x50 cm dan Ketebalan 1,5


1 3 2 04 01 08 058 Alat Perebusan/ Panci Rebus Unit 2,889,600 441,531
mm Bahan Stainless
1 3 2 04 01 08 059 Hand Sealer Panjang 30 cm Unit 433,440 66,230
1 3 2 04 01 08 060 Talenan bahan Fiber Buah 57,792 8,831
1 3 2 04 01 08 061 Pisau Bahan Stainless Buah 122,808 18,765
Persegi, Ukuran Luar: 143x88x70 cm,
1 3 2 04 01 08 062 Bak Fiber Terbuka Ukuran Dalam: 135x80x70cm Volume Air: Buah 2,889,600 441,531
756 liter

Persegi, Ukuran Luar: 210x110x70 cm,


1 3 2 04 01 08 063 Bak Fiber Terbuka Ukuran Dalam: 200x100x70cm Volume Unit 4,478,880 684,373
Air: 1.400 liter

Bulat, Ukuran Luar: Dia160cm T 70cm,


1 3 2 04 01 08 064 Bak Fiber Terbuka Ukuran Dalam: Dia. 150cm T 70cm, Unit 3,467,520 529,837
Volume Air: 1237 liter

Bulat, Ukuran Luar: Dia 185cm T 75cm,


1 3 2 04 01 08 065 Bak Fiber Terbuka Ukuran Dalam: Dia. 175cm T 75cm, Unit 5,056,800 772,679
Volume Air: 1800 liter
1 3 2 04 01 08 066 Tali Jaring Ris Poly Ethylene ø 2 mm Gulung 45,000 6,876
1 3 2 04 01 08 067 Tali Jaring Ris Poly Ethylene ø 3 mm Gulung 55,000 8,404
1 3 2 04 01 08 068 Tali Jaring Ris Poly Ethylene ø 4 mm Gulung 95,000 14,516
1 3 2 04 01 08 069 Jaring Pangilar Kg 50,000 7,640
1 3 2 04 01 08 070 Pemberat (Bahan Timah Hitam) Berat 1 kg = 100 buah Kg 45,500 6,952
1 3 2 04 01 08 071 Pelampung Botol PVC Buah 5,000 764
1 3 2 04 01 08 072 Pelampung Roda Cincin Buah 1,000 153
1 3 2 04 01 08 073 Pelampung Sllop (warna putih) Buah 2,000 306
1 3 2 04 01 08 074 Benang Pengikat Nylon Ikat 6,500 993
1 3 2 04 01 08 075 Hapa Ukuran 100 x 300 x 100 cm Buah 90,000 13,752
1 3 2 04 01 08 076 Hapa Halus Ukuran 100 x 300 x 100 cm Buah 40,000 6,112
1 3 2 04 01 08 077 Kakaban Ukuran 100 x 60 x 10 cm Buah 31,000 4,737
1 3 2 04 01 09 078 Plastik Terpal Meter 100,000 15,280
1 3 2 04 01 10 079 Tabung Oksigen 12 kg Buah 1,350,000 206,280
1 3 2 04 01 11 080 Waring Ukuran 100 x 100 cm Buah 40,000 6,112

ASSET TETAP 1.3. Page 11 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6

1 3 2 04 01 09 ALAT-ALAT PETERNAKAN
1 3 2 04 01 09 001 Mesin Penggiling Jagung 9 PK Unit 29,903,000 4,569,178
1 3 2 04 01 09 002 Mesin Pencincang Pelepah Kelapa Sawit 12 PK Unit 75,400,000 11,521,120
1 3 2 04 01 09 003 Chopper 9 PK Unit 24,346,000 3,720,069
1 3 2 04 01 09 004 Mesin Pemotong Rumput (Mist Blower) 20 Liter Unit 2,766,600 422,736
1 3 2 04 01 09 005 Mesin Pemotong Rumput (Power Sprayer) Kualitas Bagus Unit 5,477,800 837,008
1 3 2 04 01 09 006 Mesin Pemotong Rumput (Bruss Cutter) 20 Liter Unit 1,327,900 202,903
1 3 2 04 01 09 007 Mesin Tetas Kapasitas 100 s/d 300 Butir Unit 5,953,100 909,634
1 3 2 04 01 09 008 Mesin Tetas Kapasitas s/d 500 Butir Unit 7,746,480 1,183,662
1 3 2 04 01 09 009 Mesin Tetas Kapasitas 100 s/d 300 Butir Unit 5,953,100 909,634
1 3 2 04 01 09 010 Mesin Tetas Kapasitas s/d 500 Butir Unit 7,746,480 1,183,662
1 3 2 04 01 09 011 Spuit Europleks 20 cc Kotak 393,479 60,124
1 3 2 04 01 09 012 Spuit Europleks 10 cc Buah 299,100 45,702
1 3 2 04 01 09 013 Spuit Disposibel 3 cc Lusin 149,400 22,828
1 3 2 04 01 09 014 Jarum Spuit No. 14 Nal Lusin 196,700 30,056
1 3 2 04 01 09 015 Counteiner Baj 35 Buah 48,789,000 7,454,959
1 3 2 04 01 09 016 Counteiner Mini Isi 3 Liter Buah 5,311,700 811,628
1 3 2 04 01 09 017 Inseminasi Gun Kualitas Bagus Buah 1,380,900 211,002
1 3 2 04 01 09 018 Tas Inseminator Kualitas Bagus Buah 356,000 54,397
1 3 2 04 01 09 019 Tas ATR Kualitas Bagus Buah 326,600 49,904
1 3 2 04 01 09 020 Tas PKB Kualitas Bagus Buah 310,900 47,506
1 3 2 04 01 09 021 Plastic Sheath Plastik Batang 7,800 1,192
1 3 2 04 01 09 022 Plastic Glove Plastik Lembar 2,800 428
1 3 2 04 01 09 023 Straw Kualitas Bagus Strip 59,200 9,046
1 3 2 04 01 09 024 Termos IB Kualitas Bagus Buah 1,062,300 162,319
1 3 2 04 01 09 025 Cutter For Semen Straw Kualitas Bagus Buah 448,500 68,531
1 3 2 04 01 09 026 Artificial Inseminasi Pinset Kualitas Bagus Buah 185,000 28,268
1 3 2 04 01 09 027 Sarung Tangan Plastik Kualitas Bagus Lembar 3,300 504
1 3 2 04 01 09 028 USG Kebuntingan Induk Sapi DW-3101A (Digital) Unit 50,000,000 7,640,000

1 3 2 05 02 ALAT RUMAH TANGGA


1 3 2 05 02 01 MEUBELAIR
Meja ½ Biro Bahan dari Klas I (Kayu Meranti + Plywood Non
1 3 2 05 01 01 001 120 x 60 x 75 cm. 3 Laci Buah 1,489,600 227,611
Jati)
Meja Biro Bahan dari Klas I (Kayu Meranti + Plywood Non
1 3 2 05 01 01 002 170 x 70 x 75 cm. 6 Laci Buah 3,420,000 522,576
Jati)

Meja biro bahan dari kayu jati ditutup kaca ryben 5 mm


1 3 2 05 01 01 003 bentuk L laci 6 buah lengkap dengan kunci dibalut dengan 150 x 90 x 75 cm Buah 5,320,000 812,896
sintetis. mutu baik.
1 3 2 05 01 01 004 Meja makan + 6 kursi jepara Kualitas Bagus Buah 11,491,200 1,755,855
1 3 2 05 01 01 005 Kursi Sofa Kualitas Bagus Buah 4,940,000 754,832
1 3 2 05 01 01 006 Kursi Tamu Kayu Siro 1 Set 3,512,000 536,634
1 3 2 05 01 01 007 Kursi Tamu Jepara 60x120 tebal kaca 5 mm Set 6,460,000 987,088
1 3 2 05 01 01 008 Sprei + Rimpel + Bantal + Guling Kualitas Bagus Set 7,220,000 1,103,216
1 3 2 05 01 01 009 Kursi Tamu Kualitas Bagus Set 12,160,000 1,858,048
1 3 2 05 01 01 010 Kursi Tamu Kualitas Bagus Set 14,060,000 2,148,368
1 3 2 05 01 01 011 Kursi Putar Pimpinan Lux Buah 2,394,000 365,803
1 3 2 05 01 01 012 Kursi Putar Pimpinan Kualitas Bagus Buah
1 3 2 05 01 01 013 Kursi Putar Pimpinan Kualitas Sedang Buah
1 3 2 05 01 01 014 Kursi Putar Pimpinan Kualitas Biasa Buah
1 3 2 05 01 01 015 Kursi Putar Kecil Kualitas Bagus Buah 814,000 124,379
1 3 2 05 01 01 016 Kursi biasa Plastik Kualitas Bagus Buah 95,800 14,638
1 3 2 05 01 01 017 Kursi biasa Kualitas Bagus Buah 526,700 80,480
1 3 2 05 01 01 018 Kursi Lipat Kualitas Bagus Buah 395,200 60,387
1 3 2 05 01 01 019 Kursi Lipat Pakai Tangan Kualitas Bagus Buah 1,520,000 232,256
1 3 2 05 01 01 020 Lemari Arsip 2 Pintu 160 x 79 x 41.5 cm Buah 2,681,300 409,703
1 3 2 05 01 01 021 Lemari Arsip 160 x 79 x 41.5 cm Buah 1,989,700 304,026
1 3 2 05 01 01 022 Lemari Gantung empat pintu Uk. 196 x 38 x83 cm Buah 2,394,000 365,803
1 3 2 05 01 01 023 Lemari Gantung tiga pintu Uk 120 x 65 x 40 cm Buah 2,106,700 321,904

ASSET TETAP 1.3. Page 12 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 05 01 01 024 Lemari 2 Pintu Tempahan Bahan Jepara Buah 3,515,000 537,092
1 3 2 05 01 01 025 Lemari 3 Pintu Bahan Jepara Buah 4,788,000 731,606
1 3 2 05 01 01 026 Tempat tidur biasa dari kayu klas I 200 x 180 x 45 cm Set 3,830,400 585,285
1 3 2 05 01 01 027 Kasur busa Uk. 3 Kaki (kualitas bagus) Buah 574,600 87,799
1 3 2 05 01 01 028 Kasur busa Uk. 6 Kaki (kualitas bagus) Buah 1,436,400 219,482
1 3 2 05 01 01 029 Bantal biasa kualitas bagus Buah 98,800 15,097
1 3 2 05 01 01 030 Bantal guling kualitas bagus Buah 99,300 15,173
1 3 2 05 01 01 031 Sprei + Rimpel + Bantal + Guling Tenun Tapsel Ukuran 3 kaki Set 1,587,400 242,555
1 3 2 05 01 01 032 Sprei + Rimpel + Bantal + Guling Tenun Tapsel Ukuran 5 kaki Set 2,222,300 339,567
1 3 2 05 01 01 033 Sprei + Rimpel + Bantal + Guling Tenun Tapsel Ukuran 6 kaki Set 2,645,600 404,248
MEUBELAIR UNTUK SEKOLAH
1 3 2 05 01 01 031 Meja + Kursi Murid (TK) Kualitas Bagus Set 375,700 57,407
1 3 2 05 01 01 032 Meja + Kursi Murid (SD) Kualitas Bagus Set 477,700 72,993
1 3 2 05 01 01 033 Meja + Kursi Siswa (SMP/SMK/SMA) Kualitas Bagus Set 477,700 72,993
1 3 2 05 01 01 034 Meja Guru (SMP/SMA) Kualitas Bagus Buah 318,200 48,621
1 3 2 05 01 01 035 Meja Siswa Kualitas Bagus Buah 318,200 48,621
1 3 2 05 01 01 036 Meja 1/2 biro Kualitas Bagus Buah 1,140,400 174,253
1 3 2 05 01 01 037 Meja 1 biro Kualitas Bagus Buah 1,470,300 224,662
1 3 2 05 01 01 038 Kursi Guru (SMP/SMA) Kualitas Bagus Buah 159,200 24,326
1 3 2 05 01 01 039 Kursi Siswa Kualitas Bagus Buah 159,100 24,310
1 3 2 05 01 01 040 Kursi Tunggu Viber (4 tempat duduk) Buah 4,553,900 695,836
1 3 2 05 01 01 041 Kursi Tamu Kualitas Bagus Buah 3,465,700 529,559
1 3 2 05 01 01 042 Kursi Kualitas Bagus Buah 400,100 61,135
1 3 2 05 01 01 043 Lemari Cabinet Kualitas Bagus Buah 2,369,500 362,060
1 3 2 05 01 01 044 Lemari Buku 2 pintu Buah 2,369,500 362,060
1 3 2 05 01 01 045 Rak Buku 0.40x1.80x2.40 Unit 1,963,900 300,084
1 3 2 05 01 01 046 Filing Cabinet 4 Laci Buah 1,650,600 252,212
1 3 2 05 01 01 047 Papan Tulis Kualitas Bagus Buah 368,900 56,368
1 3 2 05 01 01 048 Papan Data Kualitas Bagus Set 327,900 50,103
1 3 2 05 01 01 049 Papan Absen Kualitas Bagus Buah 102,400 15,647
1 3 2 05 01 01 050 Kursi Model Keong Set 300,000 45,840
1 3 2 05 01 01 051 Kursi Teras Kecil Set 300,000 45,840
1 3 2 05 01 01 052 Tempat koran Buah 50,000 7,640

1 3 2 05 02 02 ALAT PENGUKUR WAKTU


1 3 2 05 02 03 ALAT PEMBERSIH
1 3 2 05 01 03 001 Keset Kaki kain  Bahan kain Buah 42,300 6,463
1 3 2 05 01 03 002 Keset Kaki Plastik  Bahan Plastik Buah 31,800 4,859
1 3 2 05 01 03 003 Keset Kaki Sabut Tebal  Bahan Sabut Tebal Buah 42,300 6,463
1 3 2 05 01 03 004 Keset Kaki Sabut tipis  Bahan sabut tipis Buah 31,800 4,859
1 3 2 05 01 03 005 Sapu ijuk (Sapu Lantai) Uk. Sedang Buah 19,400 2,964
1 3 2 05 01 03 006 Sapu lidi Bahan Enau Buah 5,800 886
1 3 2 05 01 03 007 Sapu plastik Mutu Baik Buah 38,400 5,868
1 3 2 05 01 03 008 Sabun Mandi Uk. Sedang Bungkus 3,400 520
1 3 2 05 01 03 009 Sabun Cuci Cream isi 260 gr Refill Bungkus 2,700 413
1 3 2 05 01 03 010 Cairan Pencuci Piring Uk. 900 ml Bungkus 13,800 2,109
1 3 2 05 01 03 011 Cairan Pembersih Lantai Uk. 800 ml Bungkus 15,400 2,353
1 3 2 05 01 03 012 Cairan Pembersih Lantai Uk. 800 ml Bungkus 15,800 2,414
1 3 2 05 01 03 013 Cairan Pembersih Lantai Karbol Uk. 800 ml Botol 19,000 2,903
1 3 2 05 01 03 014 Tissue 100 Sheet Kotak 12,700 1,941
1 3 2 05 01 03 015 Keranjang sampah pakai tutup Bahan Plastik Buah 38,400 5,868
1 3 2 05 01 03 016 Ember Plastik Bertutup Ukuran 110 L Buah 129,600 19,803
1 3 2 05 01 03 017 Ember Plastik Bertutup Uk. Kecil (30 L) Buah 23,900 3,652
1 3 2 05 01 03 018 Gayung Air  Kwalitas bagus Buah 14,400 2,200
1 3 2 05 01 03 019 Kain Pel Gagang alumanium Buah 28,700 4,385

ASSET TETAP 1.3. Page 13 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 05 01 03 020 Kain Serbet 25x25x50 Cm Buah 10,600 1,620
1 3 2 05 01 03 021 Tempat Sampah Bahan Plastik  Sedang Buah 38,400 5,868
1 3 2 05 01 03 022 Tempat sampah bahan plastik Bertutup buah 50,000 7,640
1 3 2 05 01 03 023 Tempat sampah Berpijakan buah 90,000 13,752
1 3 2 05 01 03 024 Tempat sampah fiber 120 liter roda buah 750,000
1 3 2 05 01 03 025 Tempat sampah fiber 240 liter roda buah 950,000
1 3 2 05 01 03 026 Tempat sampah fiber double 50 liter model tanam buah 980,000
1 3 2 05 01 03 027 Serokan Sampah Bergagang Bahan Plastik Buah 26,400 4,034
1 3 2 05 01 03 028 Sikat Kamar Mandi Plastik Bergagang Uk. Sedang Buah 50,800 7,762
1 3 2 05 01 03 029 Sikat Lantai Bahan Ijuk Buah 5,300 810
1 3 2 05 01 03 030 Karbol Isi 1 Liter Botol 19,000 2,903
1 3 2 05 01 03 031 Pembersih Dari Bulu Ayam (Kemoceng) Kecil Buah 26,400 4,034
1 3 2 05 01 03 032 Cairan Pembersih Kaca Uk. 500 mL Botol 18,600 2,842
1 3 2 05 01 03 033 Pewangi Ruangan Semprot Kaleng 12,000 1,834
1 3 2 05 01 03 034 Pewangi Ruangan Uk. 250 ml Bungkus 14,400 2,200
1 3 2 05 01 03 035 Kapur Barus Bungkus isi 30 gr Buah 15,800 2,414
1 3 2 05 01 03 036 Alat Pembersih Kaca (Wiper) Karet anti jamur Buah 19,000 2,903

1 3 2 05 02 04 ALAT PENDINGIN
1 3 2 05 01 06 001 Kipas Angin Meja Kualitas Bagus Unit 130,000 19,864
1 3 2 05 01 06 002 Kipas Angin Meja Uk. 9" Unit 171,800 26,251
1 3 2 05 01 06 003 Kipas Angin Meja Uk. 6" Unit 103,400 15,800
1 3 2 05 01 06 004 Kipas Angin Meja 40 Watt. Unit 3,422,900 523,019
1 3 2 05 01 06 005 Kipas Angin Lantai Kualitas Biasa Unit 364,300 55,665
1 3 2 05 01 06 006 Kipas Angin Lantai 90W Unit 538,100 82,222
1 3 2 05 01 06 007 Kipas Angin Lantai Kualitas Bagus Unit 1,098,200 167,805
1 3 2 05 01 06 008 Kipas Angin Lantai 65 Watt. Unit 6,731,200 1,028,527
1 3 2 05 01 06 009 AC Split ¾ PK Econavi 3/4 PK. Unit 4,371,800 668,011
1 3 2 05 01 06 010 AC Split 1 PK 1 PK. 660w. Unit 3,090,800 472,274
1 3 2 05 01 06 011 AC Split 1 ½ PK 1 1/2 PK. 1166w Unit 3,663,100 559,722
1 3 2 05 01 06 012 AC Split 2 ½ PK 2 1/2 PK. 2100w. Unit 6,296,200 962,059
1 3 2 05 01 06 013 Kulkas 1 Pintu 1 Pintu Unit 1,923,300 293,880
1 Pintu ,Low Energy Consumption.
1 3 2 05 01 06 014 Kulkas 1 Pintu Unit 1,888,800 288,609
Handle. 65 Watt.
1 3 2 05 01 06 015 Kulkas 1 Pintu 1 Pintu Moist Balance Crisper. Unit 1,831,500 279,853

1 3 2 05 02 05 ALAT DAPUR
1 3 2 05 01 05 001 Wajan Aluminium Besar UK 34 Cm Buah 392,200 59,928
1 3 2 05 01 05 002 Wajan Aluminium Sedang Uk 20 cm Buah 68,800 10,513
1 3 2 05 01 05 003 Wajan Aluminium Kecil Uk 18 cm Buah 54,000 8,251
1 3 2 05 01 05 004 Wajan Teflon Besar UK 40 Cm Buah 249,200 38,078
1 3 2 05 01 05 005 Wajan Teflon Sedang Uk 36 cm Buah 211,700 32,348
1 3 2 05 01 05 006 Wajan Teflon Kecil Uk. 28 cm Buah 97,400 14,883
1 3 2 05 01 05 007 Taplak Meja Kecil Tenun Tapsel Meja Kecil Buah 188,400 28,788
1 3 2 05 01 05 008 Taplak Meja Makan Tenun Tapsel Meja Makan Buah 280,400 42,845
1 3 2 05 01 05 009 Taplak Meja Bulat Tenun Tapsel Meja Bulat Buah 952,300 145,511
1 3 2 05 01 05 010 Plastik Taplak Meja Transparan Ketebalan Sedang Meter 20,100 3,071
1 3 2 05 01 05 011 Kompor Minyak Tanah 16 Sumbu Buah 211,700 32,348
1 3 2 05 01 05 012 Kompor Minyak Tanah 22 Sumbu Buah 343,100 52,426
1 3 2 05 01 05 013 Kompor Gas + selang dan regulator Portable 2 Tungku Set 396,800 60,631
1 3 2 05 01 05 014 Tabung Gas LPG kosong Isi 12 Kg Buah 396,800 60,631
1 3 2 05 01 05 015 Pengisian Gas LPG 12 Kg Kali 143,600 21,942
1 3 2 05 01 05 016 Tempat Nasi Aluminium Buah 146,700 22,416
1 3 2 05 01 05 017 Tempat Nasi Bahan Kaca Buah 42,300 6,463
1 3 2 05 01 05 018 Tempat Nasi Plastik Besar Buah 49,000 7,487
1 3 2 05 01 05 019 Baskom Stainless Steel Uk 40 Cm Buah 44,100 6,738

ASSET TETAP 1.3. Page 14 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 05 01 05 020 Piring Makan Kaca Lusin 176,700 27,000
1 3 2 05 01 05 021 Piring Makan Bahan Plastik Lusin 24,700 3,774
1 3 2 05 01 05 022 Centong Nasi Bahan Plastik Buah 4,900 749
1 3 2 05 01 05 023 Gentong plastik Isi 30 L Buah 47,600 7,273
1 3 2 05 01 05 024 Gentong plastik Mutu Baik 30 L Buah 77,500 11,842
1 3 2 05 01 05 025 Pisau Stainless Steel Sedang Uk. 5" Buah 14,800 2,261
1 3 2 05 01 05 026 Pisau Stainless Steel Besar Uk. 7" Buah 24,700 3,774
1 3 2 05 01 05 027 Blender Kualitas Bagus Buah 637,300 97,379
1 3 2 05 01 05 028 Blender Kualitas Biasa Buah 342,000 52,258
1 3 2 05 01 05 029 Cangkir Kaca  Pendek Lusin 98,000 14,974
1 3 2 05 01 05 030 Cangkir Melamin Lusin 98,000 14,974
1 3 2 05 01 05 031 Ceret Stainless dia 24 Inchi Buah 147,100 22,477
1 3 2 05 01 05 032 Handuk 50 x 100 cm Buah 52,900 8,083
1 3 2 05 01 05 033 Handuk 67 x 140 cm Buah 89,700 13,706
1 3 2 05 01 05 034 Mixer Kualitas Bagus Buah 490,200 74,903
1 3 2 05 01 05 035 Panci Aluminium 32 inchi/2.5 tumba Buah 98,000 14,974
1 3 2 05 01 05 036 Papan Iris Kayu/sedang Buah 25,400 3,881
1 3 2 05 01 05 037 Rantang Stainless Steel Buah 78,700 12,025
1 3 2 05 01 05 038 Selang LPG Kualitas Bagus Meter 98,000 14,974
1 3 2 05 01 05 039 Regulator LPG Kualitas Bagus Buah 250,000 38,200
1 3 2 05 01 05 040 Sendok Cup 40 cm stainless Buah 22,300 3,407
1 3 2 05 01 05 041 Termos Air Panas Uk. 1L Stainless Buah 225,700 34,487
1 3 2 05 01 05 042 Termos Air Panas Uk. 2L Plastik Buah 78,700 12,025
1 3 2 05 01 05 043 Vacum Cleaner Portable 800 Watt Unit 763,000 116,586
1 3 2 05 01 05 044 Mikrowave / Oven 4 Rak Unit 5,000,000 764,000
1 3 2 05 01 05 045 Dispenser Miyako buah 200,000 30,560
1 3 2 05 01 05 046 Magic Com Yongma buah 600,000 91,680
1 3 2 05 01 05 047 Parang Sarung Buah 35,000 5,348
1 3 2 05 01 05 048 Parang Sarung Jati Panjang Buah 95,000 14,516
1 3 2 05 01 05 049 Pisau Sarung Jati Buah 45,000 6,876
1 3 2 05 01 05 050 Pisau dapur Hitam Buah 15,000 2,292
1 3 2 05 01 05 051 Parang Bengkok Buah 25,000 3,820
1 3 2 05 01 05 052 Parang Gagang Plastik Buah 35,000 5,348
1 3 2 05 01 05 053 Lukkas Buah 20,000 3,056
1 3 2 05 01 05 054 Parang Gagang Besi Besar Buah 30,000 4,584
1 3 2 05 01 05 055 Pagarang Gagang Besi Kecil Buah 25,000 3,820
1 3 2 05 01 05 056 Parang Cincang Buah 30,000 4,584
1 3 2 05 01 05 057 Parang Cincang Ingul Buah 25,000 3,820
1 3 2 05 01 05 058 Pisau Goluk Buah 15,000 2,292
1 3 2 05 01 05 059 Pisau Rambo Buah 65,000 9,932
1 3 2 05 01 05 060 Parang Layang Buah 60,000 9,168
1 3 2 05 01 05 061 Dodos Kecil Kecil 30,000 4,584
1 3 2 05 01 05 062 Dodos Besar Buah 50,000 7,640
1 3 2 05 01 05 063 Pisau Guris Besi Buah 20,000 3,056
1 3 2 05 01 05 064 Parang Sarung Kuningan Buah 65,000 9,932
1 3 2 05 01 05 065 Samurai P anjang Buah 250,000 38,200
1 3 2 05 01 05 066 Pedang Jati Panjang Buah 350,000 53,480
1 3 2 05 01 05 067 Asbak Batang Kelapa Buah 25,000 3,820
1 3 2 05 01 05 068 Asbak Kayu Buah 20,000 3,056
1 3 2 05 01 05 069 Cangkir Batok Kelapa Buah 20,000 3,056
1 3 2 05 01 05 070 Ceret Batok Kelapa Buah 90,000 13,752
1 3 2 05 01 05 071 Pring Besar Kayu Buah 50,000 7,640
1 3 2 05 01 05 072 Tempat Buah 1 Tingkat Buah 100,000 15,280
1 3 2 05 01 05 073 Losung Besar Buah 80,000 12,224
1 3 2 05 01 05 074 Losung Kecil Buah 50,000 7,640
1 3 2 05 01 05 075 Losung Sedang Buah 65,000 9,932

ASSET TETAP 1.3. Page 15 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 05 02 07 ALAT PEMADAM KEBAKARAN
1 3 2 05 02 07 001 Selang Pemadam Kebakaran Full Rubber Hose 2,5 " with Roll
Machino Coupling 2,5"
1 3 2 05 02 07 002 Tabung Pemadam Api 3 Kg Buah
1 3 2 05 02 07 003 Baju Tahan Api dan Panas Nomex set
1 3 2 05 02 07 004 Sepatu pemadam Kebakaran Rubber set
1 3 2 05 02 07 005 Kampak Pemadam Kebakaran Plat Besi Tebal Pasang
1 3 2 05 02 07 006 Nozzle 2,5" buah
1 3 2 05 02 07 007 Tali Rapling Set Rope Rescue Set
1 3 2 05 02 07 008 Tenda Pleton Daya Tampung 40 org Set

1 3 2 06 ALAT STUDIO, KOMUNIKASI DAN PEMANCAR


1 3 2 06 02 ALAT KOMUNIKASI
1 3 2 06 02 04 ALAT KOMUNIKASI RADIO VHF
1 3 2 06 02 04 001 Alinco DR-635 Dualband VHF/UHF Dualband Unit 3,945,300 602,842
1 3 2 06 02 04 002 Icom IC-2200H Black Single Band VHF Power 60Watt 60 Watt Unit 5,051,300 771,839
1 3 2 06 02 04 003 ICOM IC-V8000 Single Band VHF Power 75Watt 75 Watt Unit 3,806,500 581,633
1 3 2 06 02 04 004 Alinco DR-B185 Single Band VHF Power 80 Watt 80 Watt Unit 2,178,500 332,875

1 3 2 06 02 04 005 ALINCO DR-135 MK3 Single Band VHF Power 50WATT 50 Watt Unit 2,130,700 325,571

1 3 2 06 02 04 006 Yaesu FT 1900R/E Single Band VHF Power 55Watt 55 Watt Unit 1,843,400 281,672
1 3 2 06 02 04 007 Icom IC-2730 Dual Band VHF/UHF Dualband Unit 4,136,800 632,103
1 3 2 06 02 04 008 Kenwood TM-281A Single Band VHF Power 65Watt 65 Watt Unit 2,082,800 318,252
1 3 2 06 02 04 009 Yaesu FT-2900R Single Band VHF Power 75Watt 75 Watt Unit 2,173,800 332,157
1 3 2 06 02 04 010 Alinco DR 138 Single Band VHF Singleband Unit 1,963,100 299,962
1 3 2 06 02 04 011 Icom IC 718 Kualitas Bagus Unit 6,296,200 962,059
1 3 2 06 02 04 012 Alinco DX-SR8 Kualitas Bagus Unit 4,596,500 702,345
1 3 2 06 02 04 013 Yaesu FT-450 Kualitas Bagus Unit 7,565,000 1,155,932
1 3 2 06 02 04 014 Icom IC-2300H Single Band VHF Power 60 Watt 60 Watt Unit 2,135,400 326,289
Baofeng GT-3TP Mark III Dual Band Waterproof POWER 8
1 3 2 06 02 04 015 8 Watt Unit 804,400 122,912
watt
1 3 2 06 02 04 016 Radion RT-102 Dual Band VHF/UHF Power 5Watt 5 Watt Unit 689,500 105,356
1 3 2 06 02 04 017 Ht Lupax T-1088 Tri Band Triband Unit 1,120,400 171,197
1 3 2 06 02 04 018 Motorola Gp338 VHF/UHF Dualband Unit 3,806,500 581,633
1 3 2 06 02 04 019 Firstcom FC-27 Dual Band VHF/UHF Waterproof Dualband Unit 689,500 105,356
1 3 2 06 02 04 020 Firstcom FC-139 Single Band VHF Singleband Unit 641,600 98,036
1 3 2 06 02 04 021 Motorola GP 2000 VHF/UHF Dualband Unit 1,723,700 263,381
1 3 2 06 02 04 022 Alinco DJ-CRX5 DualBand UHF Dan VHF Dualband Unit 957,600 146,321
1 3 2 06 02 04 023 ALINCO DJ A-10 Single Band VHF Singleband Unit 1,034,200 158,026
1 3 2 06 02 04 024 Alinco DJ-CRX1 Single Band VHF Singleband Unit 900,100 137,535
1 3 2 06 02 04 025 Alinco DJ-W500 Dual Band VHF/UHF Dualband Unit 1,311,900 200,458
1 3 2 06 02 04 026 Motorola CP1660 Single Band VHF/UHF Singleband Unit 2,202,500 336,542
1 3 2 06 02 04 027 LupaX VEV-V18 Dual band VHF/UHF Dualband Unit 727,800 111,208
1 3 2 06 02 04 028 Yaesu VX-8DR Power 5Watt 5 Watt Unit 5,290,700 808,419
1 3 2 06 02 04 029 Yaesu VX-6R Dual Band VHF/UHF Dualband Unit 3,322,900 507,739
1 3 2 06 02 04 030 Weierwei VEV-UV888 Duelband 10 Watt 10 Watt Unit 938,400 143,388
1 3 2 06 02 04 031 icom IC-V80 Waterproof Single Band VHF Singleband Unit 1,206,600 184,368
1 3 2 06 02 04 032 ALINCO DJ-W100 Single Band Singleband Unit 1,158,700 177,049
1 3 2 06 02 04 033 YAESU VX-3R Single Band Singleband Unit 2,274,300 347,513
1 3 2 06 02 04 034 Antena Radio Komunikasi SG2000 Kualitas Bagus Unit 287,300 43,899
1 3 2 06 02 04 035 Antena Mobil SG7500 Kualitas Bagus Unit 287,300 43,899
1 3 2 06 02 04 036 Antena Mobil SG-M510 Kualitas Bagus Unit 205,900 31,462
1 3 2 06 02 04 037 Mobile Radio Antenna M-285HT Kualitas Bagus Unit 191,500 29,261
1 3 2 06 02 04 038 Nagoya NA-701 Male Kualitas Bagus Unit 119,700 18,290
1 3 2 06 02 04 039 Diamond SG-7900 Kualitas Bagus Unit 1,110,800 169,730
1 3 2 06 02 04 040 Bracket Magnet Segitiga Kualitas Bagus Unit 249,000 38,047
1 3 2 06 02 04 041 Mic HT Cina Kualitas Bagus Unit 110,100 16,823
1 3 2 06 02 04 042 Battery Icom BP-265 Kualitas Bagus Unit 263,300 40,232

ASSET TETAP 1.3. Page 16 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 06 02 04 043 SWR Maldol Kualitas Bagus Unit 335,200 51,219
1 3 2 06 02 04 044 Conektor Kabel RG58 Kualitas Bagus Unit 28,700 4,385
1 3 2 06 02 04 045 Coaxial Cable MJ-MP RG58 Kualitas Bagus Unit 105,300 16,090
1 3 2 06 02 04 046 Kabel Bracket Antena Mobil D 515 Kualitas Bagus Unit 114,900 17,557
1 3 2 06 02 04 047 Power Supply RCE 40AM Kualitas Bagus Unit 861,800 131,683
1 3 2 06 02 04 048 Charger Motorola GP-2000 Kualitas Bagus Unit 268,100 40,966
1 3 2 06 02 04 049 Charger Yaesu CD-47 Kualitas Bagus Unit 373,500 57,071
1 3 2 06 02 04 050 Charger Icom BC-192 Kualitas Bagus Unit 201,100 30,728
1 3 2 06 02 04 051 Charger Alinco DJ-196 Kualitas Bagus Unit 268,100 40,966
1 3 2 03 1 10 114 Pisau Sarung Biasa Buah 60,000 9,168

1 3 2 08 01 31 ALAT LABORATORIUM METROLOGIE


1 3 2 08 1 31 001 Alat Uji Meteran Kayu 1 meter/1mm dari kuningan tebal ≥ 5 mm Unit 3,320,215 507,329
1 3 2 08 1 31 002 Bourje 1/2 dl – 10 Liter Set 16,400,253 2,505,959
1 3 2 08 1 31 003 Vernier Caliper db 0,01 mm Unit 7,589,062 1,159,609

1 3 2 08 01 64 UNIT ALAT LABORATORIUM LAINNYA


ALAT UJI POMPA UKUR BBM
1 3 2 08 1 64 001 BUS 5 liter Steinless steel plusi landasan Bejana Set 4,268,848 652,280
1 3 2 08 1 64 002 BUS 10 liter Steinless steel plus landasan Bejana Set 4,743,164 724,755
1 3 2 08 1 64 003 BUS 20 liter Steinless steel plus landasan Bejana Set 7,114,746 1,087,133
1 3 2 08 1 64 004 Gelas Ukur 1L/100mL db 100 mL Unit 948,633 144,951
1 3 2 08 1 64 005 Stop watch Unit 3,794,531 579,804
1 3 2 08 1 64 006 Timbangan Analitik Kap. 60 Kg/0,1g db ≤ 0,1 g Unit 295,024,788 45,079,788
1 3 2 08 1 64 007 Timbangan Analitik Kap. 10 Kg/0,01 g db ≤ 0,01 g Unit 55,480,787 8,477,464
1 3 2 08 1 64 008 Timbangan Analitik Kap. 60 g/0,1 mg db ≤ 0,1 mg Unit 86,667,074 13,242,729
1 3 2 08 1 64 009 Neraca Tera A 75 Kg Uk. 75 Kg Unit 86,088,423 13,154,311
1 3 2 08 1 64 010 Neraca Tera B 10 Kg Uk. 10 Kg Unit 54,783,542 8,370,925
1 3 2 08 1 64 011 Neraca Tera C 1 Kg Uk. 10 Kg Unit 31,304,881 4,783,386
1 3 2 08 1 64 012 Neraca Tera D 50 gram Uk. 50 Gram Unit 28,696,141 4,384,770
1 3 2 08 1 64 013 Neraca Tera E 1 gram Uk. 1 Gram Unit 81,392,691 12,436,803
Alat Uji TE kelas III dan IV
1 3 2 08 1 64 014 AT Kelas F2 Kap. (1mg s/d 2 Kg) Stainless Steel Set 5,217,481 797,231
1 3 2 08 1 64 015 AT Kelas F2 Kap. 5 Kg Stainless Steel Unit 4,031,689 616,042
1 3 2 08 1 64 016 AT Kelas F2 Kap. 10 Kg Stainless Steel Unit 7,114,746 1,087,133
1 3 2 08 1 64 017 AT Kelas F2 Kap. 20 Kg Stainless Steel Unit 13,280,859 2,029,315
1 3 2 08 1 64 018 AT Kelas M2 Kap. 1mg s/d 2 Kg Stainless Steel Set 4,150,268 634,161
1 3 2 08 1 64 019 AT Kelas M2 Kap. 5 Kg Stainless Steel Unit 3,462,510 529,072
1 3 2 08 1 64 020 AT Kelas M2 Kap. 10 Kg Stainless Steel Unit 7,589,062 1,159,609
1 3 2 08 1 64 021 AT kelas M2 Kap. 20 Kg Stainless Steel Unit 14,039,765 2,145,276
Alat Uji Dacin Logam
1 3 2 08 1 64 022 Lemping + Tangkai Pengait 10 Kg Kuningan Massiv Set 1,422,950 217,427
1 3 2 08 1 64 023 Lemping Kelas M1 Kap.5 Kg Kuningan Massiv Unit 2,181,855 333,387
1 3 2 08 1 64 024 Lemping Kelas M1 Kap.10 Kg Kuningan Massiv Unit 2,466,445 376,873
1 3 2 08 1 64 025 Lemping Kelas M1 Kap.20 Kg Kuningan Massiv Unit 4,861,743 742,874
1 3 2 08 1 64 026 Kaki Tiga Penggantung Dacin Logam Tinggi 2 m dpt di stel tinggi rendah Unit 1,328,086 202,932
Alat Uji Timb.Cepat, Pegas
1 3 2 08 1 64 027 AT Kelas M2 20 Kg (Bidur) Bahan Besi Massiv/Besi Cor Unit 521,748 79,723
1 3 2 08 1 64 028 AT Remidi Kelas M2 Kap. 1g – 1 Kg Bahan Kuningan Set 3,462,510 529,072
Standar Uji Bobot Ingsut
1 3 2 08 1 64 029 AT Kelas M2 Kap. 500 g Bahan Kuningan Unit 474,317 72,476
1 3 2 08 1 64 030 AT kelas M2 Kap. 1 Kg Bahan Kuningan Unit 687,759 105,090
1 3 2 08 1 64 031 AT kelas M2 Kap. 2 Kg Bahan Kuningan Unit 1,992,129 304,397
1 3 2 08 1 64 032 AT kelas M2 Kap. 5 Kg Bahan Kuningan Unit 3,320,215 507,329
Alat Uji Timbangan Meja
1 3 2 08 1 64 033 AT Kelas M2 Kap. 20 Kg Bahan Besi Unit 1,778,687 271,783
1 3 2 08 1 64 034 AT Kelas M2 Kap. 10 Kg Bahan Besi Unit 1,019,780 155,822
1 3 2 08 1 64 035 AT Kelas M2 Kap. 5 Kg Bahan Besi Unit 616,612 94,218
1 3 2 08 1 64 036 AT Kelas M2 Kap. 2 Kg Bahan Besi Unit 474,317 72,476
1 3 2 08 1 64 037 AT Kelas M2 Kap. 1 Kg Bahan Besi Unit 237,158 36,238

ASSET TETAP 1.3. Page 17 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 08 1 64 038 Anak Timbangan Milligram Bahan Aluminium Set 1,185,791 181,189
1 3 2 08 1 64 039 Timbangan Elektronik Kelas III db 0,5 g Unit 35,716,024 5,457,408
1 3 2 08 1 64 040 Timbangan Elektronik Kelas III db 1 g Unit 14,822,387 2,264,861
Perlengkapan Pendukung dan Pengkondisi Ruangan
1 3 2 08 1 64 041 Thermohygrometer Sistem Digital Unit 2,262,489 345,708
1 3 2 08 1 64 042 Thermometer 100 °C (Hg) Derajat celcius Unit 437,337 66,825
1 3 2 08 1 64 043 Barometer Resolusi 1 hPa atau 1 mmHg Unit 1,826,118 279,031
1 3 2 08 1 64 044 Dehumidifier Kompresor ≤ 400 W Unit 12,189,931 1,862,621
1 3 2 08 1 64 045 Meja Tahan Getar Alas meja dr Marmer tebal min 10 cm Unit 23,241,503 3,551,302
Perlengkapan Pendukung Tera/Tera Ulang

Alas meja dr kayu tebal min 2 cm , rangka


1 3 2 08 1 64 046 Meja Sidang Tera/Tera Ulang Unit 2,276,718 347,883
dan kaki dr besi siku dpt dilipat uk. ≥ 4 cm

1 3 2 08 1 64 047 Tool Set Sidang Tera/Tera Ulang Kualitas Bagus Set 13,992,333 2,138,028
Memiliki 2 penjepit sah plombir dgn
1 3 2 08 1 64 048 Tang Segel Unit 1,422,950 217,427
penyetel
1 3 2 08 1 64 049 Landasan Cap Tanda Tangan Lengkap  Bahan Besi Tempa Unit 10,933,502 1,670,639

1 3 2 08 07 ALAT LABORATORIUM LINGKUNGAN HIDUP


1 3 2 08 07 01 ALAT LABORATORIUM KWALITAS AIR DAN TANAH
1 3 2 08 07 01 001 (Alat Laboratorium Kwalitas Air dan Tanah)DO Meter Merk Istek, Model 30 N Unit 26,000,000 3,972,800
1 3 2 08 07 01 002 Eckman - Berge Dredge Stainless Steel Unit 15,600,000 2,383,680
1 3 2 08 07 01 003 Current Meter Merk Global Water, Type FP111 Unit 52,392,000 8,005,498
1 3 2 08 07 01 004 pH Meter Type 25N, Merk Istek Unit 21,000,000 3,208,800
1 3 2 08 07 01 005 Termometer Kaca Merk Alla France Unit 354,000 54,091
1 3 2 08 07 01 006 Digital Depth Sounder Merk Hondex Unit 15,900,000 2,429,520
1 3 2 08 07 01 007 Alat Filter Sample TSS SNI Methode, Unit 17,200,000 2,628,160
1 3 2 08 07 01 008 Pompa Vakum Merk Boeco Germany Unit 20,500,000 3,132,400
1 3 2 08 07 01 009 TDS Meter + Konductivity Meter Merk Istek, Type EC 40N Unit 25,900,000 3,957,520
1 3 2 08 07 01 010 Turbidi Meter Merk Istek, Type K100TB Unit 28,600,000 4,370,080
1 3 2 08 07 02 ALAT LABORATORIUM KWALITAS UDARA -
1 3 2 08 07 02 001 Gas Sampler Air Sampler Impinger Unit 54,000,000 8,251,200
1 3 2 08 07 02 002 Eckman - Berge Dredge Stainless Steel Unit 15,600,000 2,383,680
1 3 2 08 07 02 003 Light Meter Digital Lux Meter Unit 28,275,000 4,320,420
1 3 2 08 07 02 004 Heat Shield Base Module Unit 70,000,000 10,696,000
1 3 2 08 07 02 005 TSP Particulate System Unit 101,500,000 15,509,200
1 3 2 08 07 02 006 Micromate ISEE-Geo/Microphone Unit 200,500,000 30,636,400
1 3 2 08 07 01 007 Software untuk Micromate ISEE Unit 50,150,000 7,662,920
1 3 2 08 07 01 008 Micromate Printer Unit 29,500,000 4,507,600
1 3 2 08 07 01 009 Sound Level Microphone for Micromate Unit 76,600,000 11,704,480

1 3 2 10 KOMPUTER
1 3 2 10 01 KOMPUTER UNIT
1 3 2 10 01 01 KOMPUTER JARINGAN
1 3 2 10 01 02 PERSONAL KOMPUTER
Ellite One 800 G2 (Corre i5, 8 GB, 1 TB,
1 3 2 05 01 06 001 Komputer Desktop Unit 18,450,000 2,819,160
Win10, 23 Inch Touch)

Intel Core Tm i7 - 7700T (4GB, 1TB,


1 3 2 05 01 06 002 Komputer Desktop 23.8", Win 10 SL + MS. Office Home & Unit 18,445,000 2,818,396
Bussines) - Black

Core i5, 4GB, 1 TB, 23-In, Win 10 Home,


1 3 2 05 01 06 003 Komputer Desktop Unit 18,429,060 2,815,960
OHB2016
1 3 2 05 01 06 004 Komputer Desktop IMAC i5 2.3 GHz (MM QA2ID/A) Unit 18,376,000 2,807,853
1 3 2 05 01 06 005 Komputer Desktop 90PT01V1-M02200 + RAM 4GB Unit 18,328,000 2,800,518
1 3 2 05 01 06 006 Komputer Desktop iMAC (MK142ID/A) Unit 18,324,000 2,799,907
All-In-One OptiPlex 7450 Non Windows
1 3 2 05 01 06 007 Komputer Desktop Unit 17,399,000 2,658,567
(Core i7-7700)
iMac RD MNED2ID/A (Core i5, 8GB, 2TB,
1 3 2 05 01 06 008 Komputer Desktop Unit 38,680,000 5,910,304
27 Inch) AIO Desktop PC

ASSET TETAP 1.3. Page 18 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
All-In-One Ideal Centre AIO910 - 27ISH
1 3 2 05 01 06 009 Komputer Desktop (Touch Screen) (Core i7, 8GB, 1 TB, VGA, Unit 30,037,360 4,589,709
27-In, Win 10)

Aspire U27-880 (i7-7500U, 8GB,1TB, 27",


1 3 2 05 01 06 010 Komputer Desktop Unit 25,960,000 3,966,688
Win 10 Home)
Touchscreen All In One i7 8GB 1TB
1 3 2 05 01 06 011 Komputer Desktop Unit 24,837,770 3,795,211
DVDRW Win Pro Office
1 3 2 05 01 06 012 Komputer Desktop All In One ZN270IEGT-RA094T Unit 24,322,157 3,716,426
OptiPlex 7450 AIO CTO Intel Core i7-6700
1 3 2 05 01 06 013 Komputer Desktop Win 10 Pro 16GB, 2TB, HDD AMD Unit 24,099,000 3,682,327
Radeon R7M465X 2GB
1 3 2 05 01 06 014 Komputer Desktop Intel Celeron Processor N3050 - Black Unit 5,462,150 834,617
LENOVO Lenovo S200z-PIA AIOIntel
1 3 2 05 01 06 015 Komputer Desktop Unit 5,515,840 842,820
Core J3060 DOS 2GB 500GB HDD

ASUS Asus EEETOP A4110-BD212X AIO


1 3 2 05 01 06 016 Komputer Desktop Intel Celeron J3160 Win 10 SL 2GB Unit 5,968,000 911,910
500GB HDD

LENOVO All-In-One Ideal Centre AIO310 -


1 3 2 05 01 06 017 Komputer Desktop 20ASR (AMD E2-9000,4GB, 500GB, Unit 5,984,100 914,370
19,5In, Win 10)

ASUS AIO V200IBUK-BC137X Intel


1 3 2 05 01 06 018 Komputer Desktop Unit 7,290,900 1,114,050
Braswell N3700

LENOVO All-In-One IdealCenter AIO310-


1 3 2 05 01 06 019 Komputer Desktop 20ASR (AMD A9-9400, 4GB, 500GB, Unit 7,378,350 1,127,412
19,5In, Win 10)

HP 20-c013d Dual Core J3060 4GB


1 3 2 05 01 06 020 Komputer Desktop Unit 7,614,850 1,163,549
500GB DVD 19.45in Win 3 Years
1 3 2 05 01 06 021 Laptop Asus A43E-VX1078D Unit 4,547,100 694,797
1 3 2 05 01 06 022 Laptop Asus A45VD-VX269D Unit 5,477,300 836,931
1 3 2 05 01 06 023 Laptop Asus A43E-VX1070D Unit 3,823,600 584,246
1 3 2 05 01 06 024 Laptop Asus A46CM-WX093D Unit 5,066,200 774,115
1 3 2 05 01 06 025 Laptop Asus A46CM-WX095D Unit 8,577,400 1,310,627
1 3 2 05 01 06 026 Laptop Asus G46VW-W3061H Unit 9,007,500 1,376,346
1 3 2 05 01 06 027 Laptop Asus N46VZ-V3065H Unit 10,643,800 1,626,373
1 3 2 05 01 06 028 Laptop Asus N46VZ-V3096D Unit 9,817,700 1,500,145
1 3 2 05 01 06 029 Laptop Asus N56VZ-S4329D Unit 11,057,200 1,689,540
1 3 2 05 01 06 030 Laptop Asus S46CM-WX131H Unit 7,543,800 1,152,693
1 3 2 05 01 06 031 Laptop Asus U47VC-WO028V Unit 9,094,200 1,389,594
1 3 2 05 01 06 032 Laptop Asus VivoBook X201E Unit 2,996,700 457,896
1 3 2 05 01 06 033 Laptop Asus VivoBook X202E Unit 5,993,400 915,792
1 3 2 05 01 06 034 Laptop Asus X301A-RX015R Unit 5,580,700 852,731
1 3 2 05 01 06 035 Laptop Asus X45A-VX058D Unit 3,513,500 536,863
1 3 2 05 01 06 036 Laptop Asus X45U-VX049D Unit 3,720,200 568,447
1 3 2 05 01 06 037 Laptop Toshiba Portege R830-2067U Unit 11,367,300 1,736,923
1 3 2 05 01 06 038 Laptop Toshiba Portege R930-2028 Unit 13,320,700 2,035,403
1 3 2 05 01 06 039 Laptop Toshiba Portege Z930-2000U Unit 15,194,100 2,321,658
1 3 2 05 01 06 040 Laptop Toshiba Portege Z930-2029 Unit 16,338,900 2,496,584
1 3 2 05 01 06 041 Laptop Toshiba Satellite L735-1128U Unit 4,995,300 763,282
1 3 2 05 01 06 042 Laptop Toshiba Satellite L745-1105U Unit 5,932,000 906,410
1 3 2 05 01 06 043 Laptop Toshiba Satellite L745-1109UB Unit 6,244,100 954,098
1 3 2 05 01 06 044 Laptop Toshiba Satellite L745-1216U Unit 5,203,400 795,080
1 3 2 05 01 06 045 Laptop Toshiba Satellite L840-1015 Unit 6,764,500 1,033,616
1 3 2 05 01 06 046 Laptop Toshiba Satellite M840-1025X Unit 8,013,300 1,224,432
1 3 2 05 01 06 047 Laptop Toshiba Satellite U940-1000X Unit 12,071,900 1,844,586
1 3 2 05 01 06 048 Laptop Acer Aspire E1-421-11202G32Mn Unit 3,434,200 524,746
1 3 2 05 01 06 049 Laptop Acer Aspire E1-471G-32322G50Mn Unit 5,307,500 810,986
1 3 2 05 01 06 050 Laptop Acer Aspire One 725 Unit 2,809,800 429,337

ASSET TETAP 1.3. Page 19 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 05 01 06 051 Laptop Acer Aspire One 725 Win 8 Unit 3,330,200 508,855
1 3 2 05 01 06 052 Laptop Acer Aspire S7 Ultrabook Unit 17,171,400 2,623,790
1 3 2 05 01 06 053 Laptop Acer Aspire V3-471G-73614G1TMa Unit 9,366,200 1,431,155
1 3 2 05 01 06 054 Laptop Acer Aspire V5-171-32364G50Ass Unit 4,683,000 715,562
1 3 2 05 01 06 055 Laptop Acer Aspire V5-471-33214G50Ma Unit 5,203,400 795,080
1 3 2 05 01 06 056 Laptop Acer Aspire V5-471G-33214G50Ma Unit 5,515,600 842,784
1 3 2 05 01 06 057 Laptop Acer Aspire V5-471G-53314G50Ma Win 8 Unit 6,972,500 1,065,398
1 3 2 05 01 06 058 Laptop Apple MacBook Pro MD101 Unit 12,384,200 1,892,306
1 3 2 05 01 06 059 Laptop HP 1000-1111TU Unit 4,475,000 683,780
1 3 2 05 01 06 060 Laptop HP Compaq 430 Unit 4,579,000 699,671
1 3 2 05 01 06 061 Laptop HP Envy 4-1024TU Sleekbook Unit 6,348,100 969,990
1 3 2 05 01 06 062 Laptop HP G4-1314TU Unit 6,452,200 985,896
1 3 2 05 01 06 063 Laptop HP Mini Note 210-4015 Unit 2,913,900 445,244
1 3 2 05 01 06 064 Laptop HP Pavilion 14-B009AU Sleekbook Unit 3,538,300 540,652
1 3 2 05 01 06 065 Laptop HP Pavilion DM4-3115TX Unit 7,493,000 1,144,930
1 3 2 05 01 06 066 Laptop Lenovo B475-6883 Unit 3,954,700 604,278
1 3 2 05 01 06 067 Laptop Lenovo Edge E125-37A Unit 5,203,700 795,125
1 3 2 05 01 06 068 Laptop Lenovo Edge E130-A97 Unit 4,058,700 620,169
1 3 2 05 01 06 069 Laptop Lenovo Edge E135-A14 Unit 3,954,700 604,278
1 3 2 05 01 06 070 Laptop Lenovo Edge E420-RA3 Unit 6,036,000 922,301
1 3 2 05 01 06 071 Laptop Lenovo G470-0137 Unit 6,244,100 954,098
1 3 2 05 01 06 072 Netbook Asus K43U-VX070D Unit 3,746,500 572,465
1 3 2 05 01 06 073 Netbook Asus X44H-VX107D Unit 3,486,300 532,707
1 3 2 05 01 06 074 Netbook Asus A43E-VX794D Unit 3,382,200 516,800
1 3 2 05 01 06 075 Netbook A43E-Colour (NEW) Unit 4,058,700 620,169
1 3 2 05 01 06 076 Netbook Asus A43E-Colour (NEW) Unit 4,058,700 620,169
1 3 2 05 01 06 077 Netbook ASUS A43SJ VX395D Unit 4,162,700 636,061
1 3 2 05 01 06 078 Printer Inkjet/Printer Infus Canon MP 287 Unit 1,166,600 178,256
1 3 2 05 01 06 079 Printer Inkjet/Printer Infus Canon IP 2770. Unit 832,200 127,160
1 3 2 05 01 06 080 Printer Inkjet/Printer Infus Canon IP 4760 Unit 1,235,300 188,754
1 3 2 05 01 06 081 Printer Inkjet/Printer Infus Canon IP100 Unit 2,614,200 399,450
1 3 2 05 01 06 082 Printer Inkjet/Printer Infus Canon IX 4000 (Bubble Jet,A3) Unit 2,585,500 395,064
1 3 2 05 01 06 083 Printer Inkjet/Printer Infus Canon IX 5000 (Bubble Jet,A3) Unit 3,112,200 475,544
1 3 2 05 01 06 084 Printer Inkjet/Printer Infus Canon IX 7000 A3 Unit 4,290,000 655,512
1 3 2 05 01 06 085 Printer Inkjet/Printer Infus Canon LBP 2900 (Laser Jet) Unit 1,010,300 154,374
1 3 2 05 01 06 086 Printer Inkjet/Printer Infus Canon LBP 5100 Laser Jet Unit 5,075,300 775,506
Canon MF 4350D (Laser
1 3 2 05 01 06 087 Printer Inkjet/Printer Infus Unit 3,427,600 523,737
Print,Scan,Copy,Fax,Duplex)
Canon MF 8030CN (Laser Colour
1 3 2 05 01 06 088 Printer Inkjet/Printer Infus Unit 6,368,000 973,030
Print,Scan,Copy)
1 3 2 05 01 06 089 Printer Inkjet/Printer Infus Canon MP 258 (Print,Scan,Copy) Unit 906,100 138,452
1 3 2 05 01 06 090 Printer Inkjet/Printer Infus Canon MP 515P Unit 3,878,300 592,604
1 3 2 05 01 06 091 Printer Inkjet/Printer Infus Epson 1390 A3 Unit 3,128,900 478,096
1 3 2 05 01 06 092 Printer Inkjet/Printer Infus Epson L310 Unit 1,994,100 304,698
1 3 2 05 01 06 093 Printer Inkjet/Printer Infus Epson L360 Unit 3,020,800 461,578
1 3 2 05 01 06 094 Printer Inkjet/Printer Infus Epson LQ 680 Pro Unit 4,347,200 664,252
1 3 2 05 01 06 095 Printer Inkjet/Printer Infus Epson LQ2190 Dot Matrix USB Unit 5,187,000 792,574
1 3 2 05 01 06 096 Printer Inkjet/Printer Infus Epson LQ300+ II Unit 1,645,200 251,387
Epson LX 300+ II Dot Matrix
1 3 2 05 01 06 097 Printer Inkjet/Printer Infus Unit 1,451,600 221,804
UsSB+Paralel
1 3 2 05 01 06 098 Printer Inkjet/Printer Infus Epson PLQ-20 Unit 5,564,700 850,286
1 3 2 05 01 06 099 Printer Inkjet/Printer Infus Epson R-230X tanpa tinta Inkjet Unit 1,316,700 201,192
1 3 2 05 01 06 100 Printer Inkjet/Printer Infus Epson R2400 Unit 6,222,900 950,859
1 3 2 05 01 06 101 Printer Inkjet/Printer Infus Epson T1100 A3 Unit 2,451,500 374,589
1 3 2 05 01 06 102 Printer Inkjet/Printer Infus Epson T13 + Tinta Unit 609,500 93,132
1 3 2 05 01 06 103 Printer Inkjet/Printer Infus Epson T40W Unit 1,275,300 194,866
1 3 2 05 01 06 104 Printer Inkjet/Printer Infus Epson T60 Unit 1,484,300 226,801

ASSET TETAP 1.3. Page 20 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 2 05 01 06 105 Printer A3 Canon IX6550 Colour Set 5,310,540 811,451

1 3 2 11 02 02 ELEKTRONIK/ELECTRIC
1 3 2 11 01 02 001 Magnetometer Scintrex, Envi Pro Set 185,868,560 28,400,716
1 3 2 11 01 02 002 Geolistik Naniura, NRD 300 HF Set 47,794,775 7,303,042
1 3 2 11 01 02 003 GPS. Handly Garmin, GPS Map 62S Set 5,310,540 811,451
1 3 2 11 01 02 004 Palu Geologi Estwing, Runcing/Beku E322P Set 1,593,137 243,431
1 3 2 11 01 02 005 Compas Geologi/Klinometer Sunnto, Tandem Compas Set 3,186,357 486,875
1 3 2 11 01 02 006 Current Meter Water Mark USGS Mode 6205 MINI Set 8,496,814 1,298,313
1 3 2 11 01 02 008 Altimeter Sunnto, Brunton 5010 Set 3,186,357 486,875

1 3 2 19 PERALATAN OLAH RAGA


1 3 2 19 01 PERALATAN OLAH RAGA
1 3 2 19 01 01 PERALATAN OLAH ATLETIK
1 3 2 19 01 01 001 Cabble Crossfore 15,400,000
1 3 2 19 01 01 002 Smitch Machine 7,700,000.00
1 3 2 19 01 01 003 Leg Curi 6,600,000
1 3 2 19 01 01 004 Leg Press 7,150,000
1 3 2 19 01 01 005 Banpress 1,650,000
1 3 2 19 01 01 006 Inclain 1,650,000
1 3 2 19 01 01 007 Declain 1,650,000
1 3 2 19 01 01 008 Ring Stock/Songkang 1,650,000
1 3 2 19 01 01 009 Abdominal Single 1,430,000
1 3 2 19 01 01 010 Abdominal Double 2,200,000
1 3 2 19 01 01 011 Bag 1,320,000
1 3 2 19 01 01 012 Sit-up 1,430,000
1 3 2 19 01 01 013 Sandaran By-set 1,430,000
1 3 2 19 01 01 014 Rowling 1,870,000
1 3 2 19 01 01 015 Bangku Panjang 2,365,000
1 3 2 19 01 01 016 Bangku Pendek 440,000
1 3 2 19 01 01 017 Rak Dampel 1,650,000
1 3 2 19 01 01 018 Dudukan Sok Pendek 440,000
1 3 2 19 01 01 019 Stik PanjangStik Pendek 1,650,000
1 3 2 19 01 01 020 Stik bengkok 770,000
1 3 2 19 01 01 021 Stik Bulat 660,000
1 3 2 19 01 01 022 Stik Dampel 220,000
1 3 2 19 01 01 023 Barbel 1,650,000
1 3 2 19 01 01 024 Dampel Biasa 3,300,000
1 3 2 19 01 01 025 Dampel bongkar Pasang 9,900,000
1 3 2 19 01 01 026 Tredmil Manual 8,800,000
1 3 2 19 01 01 027 Tredmil Electrik 15,400,000
1 3 2 19 01 01 028 Sepeda 2,612,500

1 3 4 03 05 INSTALASI PEMBANGKIT LISTRIK

1 3 4 03 05 01 INSTALASI PEMBANGKIT LISTRIK TENAGA AIR (PLTA)

1 3 4 3 5 1 001 Crossflow Runner 200, Bo 100, Type CF-20 Unit 49,808,880 7,610,797
1 3 4 3 5 1 002 Crossflow Runner 200, Bo 150, Type CF-20 Unit 52,797,413 8,067,445
1 3 4 3 5 1 003 Crossflow Runner 200, Bo 200, Type CF-20 Unit 55,785,946 8,524,093
1 3 4 3 5 1 004 Crossflow Runner 200, Bo 250, Type CF-20 Unit 58,774,478 8,980,740
1 3 4 3 5 1 005 Crossflow Runner 200, Bo 300, Type CF-20 Unit 61,763,011 9,437,388
1 3 4 3 5 1 006 Crossflow Runner 200, Bo 350, Type CF-20 Unit 64,751,544 9,894,036
1 3 4 3 5 1 007 Crossflow Runner 200, Bo 400, Type CF-20 Unit 67,740,077 10,350,684
1 3 4 3 5 1 008 Crossflow Runner 200, Bo 450, Type CF-20 Unit 70,728,610 10,807,332
1 3 4 3 5 1 009 Crossflow Runner 200, Bo 500, Type CF-20 Unit 73,717,142 11,263,979
1 3 4 3 5 1 010 Crossflow Runner 200, Bo 550, Type CF-20 Unit 77,037,734 11,771,366
1 3 4 3 5 1 011 Crossflow Runner 200, Bo 600, Type CF-20 Unit 79,694,208 12,177,275
1 3 4 3 5 1 012 Crossflow Runner 225, Bo 100, Type CF-225 Unit 54,789,768 8,371,877
1 3 4 3 5 1 013 Crossflow Runner 225, Bo 150, Type CF-225 Unit 58,774,478 8,980,740
1 3 4 3 5 1 014 Crossflow Runner 225, Bo 200, Type CF-225 Unit 62,759,189 9,589,604

ASSET TETAP 1.3. Page 21 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 4 3 5 1 015 Crossflow Runner 225, Bo 250, Type CF-225 Unit 66,743,899 10,198,468
1 3 4 3 5 1 016 Crossflow Runner 225, Bo 300, Type CF-225 Unit 70,728,610 10,807,332
1 3 4 3 5 1 017 Crossflow Runner 225, Bo 350, Type CF-225 Unit 74,713,320 11,416,195
1 3 4 3 5 1 018 Crossflow Runner 225, Bo 400, Type CF-225 Unit 78,698,030 12,025,059
1 3 4 3 5 1 019 Crossflow Runner 225, Bo 450, Type CF-225 Unit 82,682,741 12,633,923
1 3 4 3 5 1 020 Crossflow Runner 225, Bo 500, Type CF-225 Unit 86,667,451 13,242,787
1 3 4 3 5 1 021 Crossflow Runner 225, Bo 550, Type CF-225 Unit 90,652,162 13,851,650
1 3 4 3 5 1 022 Crossflow Runner 225, Bo 600, Type CF-225 Unit 94,636,872 14,460,514
1 3 4 3 5 1 023 Crossflow Runner 225, Bo 650, Type CF-225 Unit 98,621,582 15,069,378
1 3 4 3 5 1 024 Crossflow Runner 300, Bo 100, Type CF-30 Unit 59,770,656 9,132,956
1 3 4 3 5 1 025 Crossflow Runner 300, Bo 150, Type CF-30 Unit 66,743,899 10,198,468
1 3 4 3 5 1 026 Crossflow Runner 300, Bo 200, Type CF-30 Unit 73,717,142 11,263,979
1 3 4 3 5 1 027 Crossflow Runner 300, Bo 250, Type CF-30 Unit 80,690,386 12,329,491
1 3 4 3 5 1 028 Crossflow Runner 300, Bo 300, Type CF-30 Unit 87,663,629 13,395,003
1 3 4 3 5 1 029 Crossflow Runner 300, Bo 350, Type CF-30 Unit 94,636,872 14,460,514
1 3 4 3 5 1 030 Crossflow Runner 300, Bo 400, Type CF-30 Unit 101,610,115 15,526,026
1 3 4 3 5 1 031 Crossflow Runner 300, Bo 450, Type CF-30 Unit 108,583,358 16,591,537
1 3 4 3 5 1 032 Crossflow Runner 300, Bo 500, Type CF-30 Unit 115,556,602 17,657,049
1 3 4 3 5 1 033 Crossflow Runner 300, Bo 550, Type CF-30 Unit 122,529,845 18,722,560
1 3 4 3 5 1 034 Crossflow Runner 300, Bo 600, Type CF-30 Unit 129,503,088 19,788,072
1 3 4 3 5 1 035 Crossflow Runner 300, Bo 650, Type CF-30 Unit 136,476,331 20,853,583
1 3 4 3 5 1 036 Crossflow Runner 300, Bo 700, Type CF-30 Unit 143,449,574 21,919,095
1 3 4 3 5 1 037 Crossflow Runner 300, Bo 750, Type CF-30 Unit 150,422,818 22,984,607
1 3 4 3 5 1 038 Crossflow Runner 300, Bo 800, Type CF-30 Unit 157,396,061 24,050,118
1 3 4 3 5 1 039 Crossflow Runner 300, Bo 850, Type CF-30 Unit 164,369,304 25,115,630
1 3 4 3 5 1 040 Crossflow Runner 300, Bo 900, Type CF-30 Unit 171,342,547 26,181,141
1 3 4 3 5 1 041 Crossflow Runner 300, Bo 950, Type CF-30 Unit 178,315,790 27,246,653
1 3 4 3 5 1 042 Crossflow Runner 300, Bo 1000, Type CF-30 Unit 185,289,034 28,312,164

1 3 4 03 05 12 INSTALASI PEMBANGKIT LISTRIK LAINNYA


1 3 4 3 5 12 001 Propeller Open Flume Runner 200, Head 2-8 m, Type OF-20 Unit 29,885,328 4,566,478
1 3 4 3 5 12 002 Propeller Open Flume Runner 300, Head 2-8 m, Type OF-30 Unit 74,713,320 11,416,195
1 3 4 3 5 12 003 Propeller Open Flume Runner 400, Head 2-8 m, Type OF-40 Unit 119,541,312 18,265,912
1 3 4 3 5 12 004 Propeller Open Flume Runner 600, Head 2-8 m, Type OF-60 Unit 174,331,080 26,637,789
1 3 4 3 5 12 005 Propeller Tubular Runner 400, Head 2-8 m, Type OF-40 Unit 119,541,312 18,265,912
1 3 4 3 5 12 006 Propeller Tubular Runner 600, Head 2-8 m, Type OF-60 Unit 174,331,080 26,637,789
1 3 4 3 5 12 007 Propeller Tubular Runner 760, Head 2-8 m, Type OF-76 Unit 224,139,960 34,248,586

1 3 4 3 5 12 008 Propeller Tubular Runner 1000, Head 2-8 m, Type OF-100 Unit 224,139,960 34,248,586

1 3 4 3 5 12 009 Pelton kW 5, Head > 50 m Type PLT- 05 Unit 29,885,328 4,566,478


1 3 4 3 5 12 010 Pelton kW 10, Head > 60 m Type PLT- 10 Unit 49,808,880 7,610,797
1 3 4 3 5 12 011 Pelton kW 20, Head > 60 m Type PLT- 20 Unit 69,732,432 10,655,116
1 3 4 3 5 12 012 Pelton kW 30, Head > 80 m Type PLT- 30 Unit 79,694,208 12,177,275
1 3 4 3 5 12 013 Pelton kW 40, Head > 80 m Type PLT- 40 Unit 99,617,760 15,221,594
1 3 4 3 5 12 014 Pelton kW 50, Head > 80 m Type PLT- 50 Unit 119,541,312 18,265,912

1 3 4 3 5 12 015 Floating Turbine Runner 1000, Bo 1200, V (m/s) 1,5 - 2,8 Unit 59,770,656 9,132,956

1 3 4 3 5 12 016 Floating Turbine Runner 1000, Bo 2400, V (m/s) 1,5 - 2,8 Unit 119,541,312 18,265,912

1 3 4 3 5 12 017 Floating Turbine Runner 2000, Bo 1200, V (m/s) 1,5 - 2,8 Unit 119,541,312 18,265,912

1 3 4 3 5 12 018 Floating Turbine Runner 2000, Bo 2400, V (m/s) 1,5 - 2,8 Unit 239,082,624 36,531,825

1 3 4 3 5 12 019 Floating Turbine Runner 2500, Bo 1200, V (m/s) 1,5 - 2,8 Unit 149,426,640 22,832,391

1 3 4 3 5 12 020 Floating Turbine Runner 2500, Bo 2400, V (m/s) 1,5 - 2,8 Unit 298,853,280 45,664,781

1 3 4 3 5 12 021 V - Belt Type B2, Ratio 2 Unit 2,988,533 456,648


1 3 4 3 5 12 022 V - Belt Type B2, Ratio 3 Unit 3,486,622 532,756
1 3 4 3 5 12 023 V - Belt Type B2, Ratio 4 Unit 3,984,710 608,864

ASSET TETAP 1.3. Page 22 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 4 3 5 12 024 V - Belt Type B2, Ratio 5 Unit 5,977,066 913,296
1 3 4 3 5 12 025 V - Belt Type B2, Ratio 6 Unit 7,969,421 1,217,728
1 3 4 3 5 12 026 V - Belt Type B3, Ratio 2 Unit 4,482,799 684,972
1 3 4 3 5 12 027 V - Belt Type B3, Ratio 3 Unit 5,229,932 799,134
1 3 4 3 5 12 028 V - Belt Type B3, Ratio 4 Unit 5,977,066 913,296
1 3 4 3 5 12 029 V - Belt Type B3, Ratio 5 Unit 8,965,598 1,369,943
1 3 4 3 5 12 030 V - Belt Type B3, Ratio 6 Unit 11,954,131 1,826,591
1 3 4 3 5 12 031 V - Belt Type B4, Ratio 2 Unit 5,977,066 913,296
1 3 4 3 5 12 032 V - Belt Type B4, Ratio 3 Unit 6,973,243 1,065,512
1 3 4 3 5 12 033 V - Belt Type B4, Ratio 4 Unit 7,969,421 1,217,728
1 3 4 3 5 12 034 V - Belt Type B4, Ratio 5 Unit 11,954,131 1,826,591
1 3 4 3 5 12 035 V - Belt Type B4, Ratio 6 Unit 15,938,842 2,435,455
1 3 4 3 5 12 036 V - Belt Type C3, Ratio 2 Unit 7,471,332 1,141,620
1 3 4 3 5 12 037 V - Belt Type C3, Ratio 3 Unit 8,716,554 1,331,889
1 3 4 3 5 12 038 V - Belt Type C3, Ratio 4 Unit 9,961,776 1,522,159
1 3 4 3 5 12 039 V - Belt Type C4, Ratio 2 Unit 12,327,698 1,883,672
1 3 4 3 5 12 040 V - Belt Type C4, Ratio 3 Unit 14,382,314 2,197,618
1 3 4 3 5 12 041 V - Belt Type C4, Ratio 4 Unit 16,436,930 2,511,563
1 3 4 3 5 12 042 V - Belt Type C5, Ratio 2 Unit 17,931,197 2,739,887
1 3 4 3 5 12 043 V - Belt Type C5, Ratio 3 Unit 20,919,730 3,196,535
1 3 4 3 5 12 044 V - Belt Type C5, Ratio 4 Unit 23,908,262 3,653,182
1 3 4 3 5 12 045 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 380 m 1,158,155 176,966
1 3 4 3 5 12 046 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 510 m 1,519,612 232,197
1 3 4 3 5 12 047 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 570 m 1,737,232 265,449
1 3 4 3 5 12 048 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 760 m 2,241,069 342,435
1 3 4 3 5 12 049 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 380 m 1,374,381 210,005
1 3 4 3 5 12 050 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 510 m 1,809,809 276,539
1 3 4 3 5 12 051 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 570 m 2,061,572 315,008
1 3 4 3 5 12 052 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 760 m 2,673,294 408,479
1 3 4 3 5 12 053 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 380 m 1,991,960 304,371
1 3 4 3 5 12 054 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 510 m 2,988,533 456,648
1 3 4 3 5 12 055 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 570 m 3,486,622 532,756
1 3 4 3 5 12 056 Penstock/Belokan Penstock Plat Besi t = 3.2 mm Dia 760 m 3,984,710 608,864
1 3 4 3 5 12 057 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 380 m 2,988,533 456,648
1 3 4 3 5 12 058 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 510 m 3,486,622 532,756
1 3 4 3 5 12 059 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 570 m 3,984,710 608,864
1 3 4 3 5 12 060 Penstock/Belokan Penstock Plat Besi t = 4.2 mm Dia 760 m 4,482,799 684,972

1 3 5 ASET TETAP LAINNYA


BARANG BERCORAK
1 3 5 02
KESENIAN/KEBUDAYAAN/OLAHRAGA
1 3 5 02 03 TANDA PENGHARGAAN
1 3 5 02 03 01 TANDA PENGHARGAAN BIDANG OLAH RAGA
Olympiade/Dunia
1 3 5 02 03 01 001 Olympiade/Dunia Medali Emas Orang
1 3 5 02 03 01 002 Olympiade/Dunia Medali Perak Orang
1 3 5 02 03 01 003 Olympiade/Dunia Medali Perunggu Orang
Asian Games
1 3 5 02 03 01 004 Asian Games Medali Emas Orang
1 3 5 02 03 01 005 Asian Games Medali Perak Orang
1 3 5 02 03 01 006 Asian Games Medali Perunggu Orang
Sea Games
1 3 5 02 03 01 007 Sea Games Medali Emas Orang
1 3 5 02 03 01 008 Sea Games Medali Perak Orang
1 3 5 02 03 01 009 Sea Games Medali Perunggu Orang
PON
1 3 5 02 03 01 010 PON Medali Emas Orang
1 3 5 02 03 01 011 PON Medali Perak Orang
1 3 5 02 03 01 012 PON Medali Perunggu Orang
KEJURNAS/POMNAS/POPNAS SENIOR

ASSET TETAP 1.3. Page 23 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 5 02 03 01 013 Senior Medali Emas Orang
1 3 5 02 03 01 014 Senior Medali Perak Orang
1 3 5 02 03 01 015 Senior Medali Perunggu Orang
KEJURNAS/POMNAS/POPNAS JUNIOR
1 3 5 02 03 01 016 Junior Medali Emas Orang
1 3 5 02 03 01 017 Junior Medali Perak Orang
1 3 5 02 03 01 018 Junior Medali Perunggu Orang
Porwil Sumatera
1 3 5 02 03 01 019 Porwil Sumatera Medali Emas Orang
1 3 5 02 03 01 020 Porwil Sumatera Medali Perak Orang
1 3 5 02 03 01 021 Porwil Sumatera Medali Perunggu Orang
Porprovsu
1 3 5 02 03 01 022 Porprovsu Medali Emas Orang
1 3 5 02 03 01 023 Porprovsu Medali Perak Orang
1 3 5 02 03 01 024 Porprovsu Medali Perunggu Orang
Porwilsu/Open Kejuaraan
1 3 5 02 03 01 025 Porwilsu/Open Kejuaraan Medali Emas Orang
1 3 5 02 03 01 026 Porwilsu/Open Kejuaraan Medali Perak Orang
1 3 5 02 03 01 027 Porwilsu/Open Kejuaraan Medali Perunggu Orang
Popdasu/Pospedasu
1 3 5 02 03 01 28 Popdasu/Pospedasu Medali Emas Orang
1 3 5 02 03 01 29 Popdasu/Pospedasu Medali Perak Orang
1 3 5 02 03 01 30 Popdasu/Pospedasu Medali Perunggu Orang
Kejurda
1 3 5 02 03 01 31 Kejurda Medali Emas Orang
1 3 5 02 03 01 32 Kejurda Medali Perak Orang
1 3 5 02 03 01 33 Kejurda Medali Perunggu Orang
Porkab/Pospekab
1 3 5 02 03 01 32 Porkab/Pospekab Medali Emas Orang
1 3 5 02 03 01 33 Porkab/Pospekab Medali Perak Orang
1 3 5 02 03 01 34 Porkab/Pospekab Medali Perunggu Orang
Kejurada Kabupaten
1 3 5 02 03 01 35 Kejurada Kabupaten Medali Emas Orang
1 3 5 02 03 01 36 Kejurada Kabupaten Medali Perak Orang
1 3 5 02 03 01 37 Kejurada Kabupaten Medali Perunggu Orang

1 3 5 02 03 02 TANDA PENGHARGAAN BIDANG OLAH RAGA


1 3 5 02 03 02 001 Calistung Juara I Orang
1 3 5 02 03 02 002 Calistung Juara II Orang
1 3 5 02 03 02 003 Calistung Juara III Orang
1 3 5 02 03 02 004 Olympiade IPA Juara I Orang
1 3 5 02 03 02 005 Olympiade IPA Juara II Orang
1 3 5 02 03 02 006 Olympiade IPA Juara III Orang
1 3 5 02 03 02 007 Olympiade Matematika Juara I Orang
1 3 5 02 03 02 008 Olympiade Matematika Juara II Orang
1 3 5 02 03 02 009 Olympiade Matematika Juara III Orang
1 3 5 02 03 02 010 Atletik Juara I Orang
1 3 5 02 03 02 011 Atletik Juara II Orang
1 3 5 02 03 02 012 Atletik Juara III Orang
1 3 5 02 03 02 013 Catur Juara I Orang
1 3 5 02 03 02 014 Catur Juara II Orang
1 3 5 02 03 02 015 Catur Juara III Orang
1 3 5 02 03 02 016 Badminton Juara I Orang
1 3 5 02 03 02 017 Badminton Juara II Orang
1 3 5 02 03 02 018 Badminton Juara III Orang
1 3 5 02 03 02 019 Tenis Meja Juara I Orang
1 3 5 02 03 02 020 Tenis Meja Juara II Orang
1 3 5 02 03 02 021 Tenis Meja Juara III Orang
1 3 5 02 03 02 022 Lomba Tari Kreasi Juara I Orang
1 3 5 02 03 02 023 Lomba Tari Kreasi Juara II Orang

ASSET TETAP 1.3. Page 24 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 5 02 03 02 024 Lomba Tari Kreasi Juara III Orang
1 3 5 02 03 02 025 Lomba Vocal Solo Putra Juara I Orang
1 3 5 02 03 02 026 Lomba Vocal Solo Putra Juara II Orang
1 3 5 02 03 02 027 Lomba Vocal Solo Putra Juara III Orang
1 3 5 02 03 02 028 Lomba Vocal Solo Putri Juara I Orang
1 3 5 02 03 02 029 Lomba Vocal Solo Putri Juara II Orang
1 3 5 02 03 02 030 Lomba Vocal Solo Putri Juara III Orang
1 3 5 02 03 02 031 Lomba Puisi Juara I Orang
1 3 5 02 03 02 032 Lomba Puisi Juara II Orang
1 3 5 02 03 02 033 Lomba Puisi Juara III Orang
1 3 5 02 03 02 034 Guru Berprestasi Juara I Orang
1 3 5 02 03 02 035 Guru Berprestasi Juara II Orang
1 3 5 02 03 02 036 Guru Berprestasi Juara III Orang
1 3 5 02 03 02 037 Kepala Sekolah Berprestasi Juara I Orang
1 3 5 02 03 02 038 Kepala Sekolah Berprestasi Juara II Orang
1 3 5 02 03 02 039 Kepala Sekolah Berprestasi Juara III Orang
1 3 5 02 03 02 040 Pengawas Berprestasi Juara I Orang
1 3 5 02 03 02 041 Pengawas Berprestasi Juara II Orang
1 3 5 02 03 02 042 Pengawas Berprestasi Juara III Orang
1 3 5 02 03 02 043 Olympiade Guru Juara I Orang
1 3 5 02 03 02 044 Olympiade Guru Juara II Orang
1 3 5 02 03 02 045 Olympiade Guru Juara III Orang
1 3 5 02 03 02 046 Lomba Budaya Tor-Tor Antar Pelajar Juara I Orang
1 3 5 02 03 02 047 Lomba Budaya Tor-Tor Antar Pelajar Juara II Orang
1 3 5 02 03 02 048 Lomba Budaya Tor-Tor Antar Pelajar Juara III Orang
1 3 5 02 03 02 049 Lomba Budaya Tor-Tor Antar Pelajar Juara Harapan I Orang
1 3 5 02 03 02 050 Lomba Budaya Tor-Tor Antar Pelajar Juara Harapan II Orang
1 3 5 02 03 02 051 Lomba Budaya Tor-Tor Antar Pelajar Juara Harapan III Orang
1 3 5 02 03 02 052 Lomba Lagu Daerah Antar Pelajar Juara I Orang
1 3 5 02 03 02 053 Lomba Lagu Daerah Antar Pelajar Juara II Orang
1 3 5 02 03 02 054 Lomba Lagu Daerah Antar Pelajar Juara III Orang
1 3 5 02 03 02 055 Lomba Lagu Daerah Antar Pelajar Juara Harapan I Orang
1 3 5 02 03 02 056 Lomba Lagu Daerah Antar Pelajar Juara Harapan II Orang
1 3 5 02 03 02 057 Lomba Lagu Daerah Antar Pelajar Juara Harapan III Orang
1 3 5 02 03 02 058 Lomba Perpustakaan Tingkat SD Juara I Orang
1 3 5 02 03 02 059 Lomba Perpustakaan Tingkat SD Juara II Orang
1 3 5 02 03 02 060 Lomba Perpustakaan Tingkat SD Juara III Orang
1 3 5 02 03 02 061 Lomba Perpustakaan Tingkat SD Juara IV Orang
1 3 5 02 03 02 062 Lomba Perpustakaan Tingkat SMP Juara I Orang
1 3 5 02 03 02 063 Lomba Perpustakaan Tingkat SMP Juara II Orang
1 3 5 02 03 02 064 Lomba Perpustakaan Tingkat SMP Juara III Orang
1 3 5 02 03 02 065 Lomba Perpustakaan Tingkat SMP Juara IV Orang
1 3 5 02 03 02 066 Lomba Petugas Pengelolaan Perpustakaan SD Juara I Orang
1 3 5 02 03 02 067 Lomba Petugas Pengelolaan Perpustakaan SD Juara II Orang
1 3 5 02 03 02 068 Lomba Petugas Pengelolaan Perpustakaan SD Juara III Orang
1 3 5 02 03 02 069 Lomba Petugas Pengelolaan Perpustakaan SD Juara IV Orang
1 3 5 02 03 02 070 Lomba Petugas Pengelolaan Perpustakaan SD Juara IV Orang
1 3 5 02 03 02 071 Lomba Petugas Pengelolaan Perpustakaan SMP Juara I Orang
1 3 5 02 03 02 072 Lomba Petugas Pengelolaan Perpustakaan SMP Juara II Orang
1 3 5 02 03 02 073 Lomba Petugas Pengelolaan Perpustakaan SMP Juara III Orang
1 3 5 02 03 02 074 Lomba Petugas Pengelolaan Perpustakaan SMP Juara IV Orang
1 3 5 02 03 02 075 Lomba Petugas Pengelolaan Perpustakaan SMP Juara IV Orang
1 3 5 02 03 02 076 Lomba Pidato dan Bercerita Tingkat SD Juara I Orang
1 3 5 02 03 02 077 Lomba Pidato dan Bercerita Tingkat SD Juara II Orang
1 3 5 02 03 02 078 Lomba Pidato dan Bercerita Tingkat SD Juara III Orang
1 3 5 02 03 02 079 Lomba Pidato dan Bercerita Tingkat SD Juara IV Orang
1 3 5 02 03 02 080 Lomba Pidato dan Bercerita Tingkat SD Juara IV Orang
1 3 5 02 03 02 081 Lomba Pidato dan Bercerita Tingkat SMP Juara I Orang
1 3 5 02 03 02 082 Lomba Pidato dan Bercerita Tingkat SMP Juara II Orang
1 3 5 02 03 02 083 Lomba Pidato dan Bercerita Tingkat SMP Juara III Orang

ASSET TETAP 1.3. Page 25 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 5 02 03 02 084 Lomba Pidato dan Bercerita Tingkat SMP Juara IV Orang
1 3 5 02 03 02 085 Lomba Pidato dan Bercerita Tingkat SMP Juara IV Orang
1 3 5 02 03 02 086 Lomba Mewarnai Tingkat TK Juara I Orang
1 3 5 02 03 02 087 Lomba Mewarnai Tingkat TK Juara II Orang
1 3 5 02 03 02 088 Lomba Mewarnai Tingkat TK Juara III Orang
1 3 5 02 03 02 089 Lomba Mewarnai Tingkat TK Juara IV Orang
1 3 5 02 03 02 090 Lomba Lagu Nasional Umum Juara I Orang
1 3 5 02 03 02 091 Lomba Lagu Nasional Umum Juara II Orang
1 3 5 02 03 02 092 Lomba Lagu Nasional Umum Juara III Orang
1 3 5 02 03 02 093 Lomba Lagu Nasional Umum Juara IV Orang
1 3 5 02 03 02 094 Lomba Karya Tulis Tingkat SMA Sederajat Juara I Orang
1 3 5 02 03 02 095 Lomba Karya Tulis Tingkat SMA Sederajat Juara II Orang
1 3 5 02 03 02 096 Lomba Karya Tulis Tingkat SMA Sederajat Juara III Orang
1 3 5 02 03 02 097 Lomba Karya Tulis Tingkat SMA Sederajat Juara IV Orang

1 3 5 5 TANAMAN
1 3 5 5 01 TANAMAN
1 3 5 5 01 01 TANAMAN
1 3 5 5 01 01 001 Tanaman Penghijauan Palam Raja Batang
1 3 5 5 01 01 002 Tanaman Penghijauan Glodokan Batang
1 3 5 5 01 01 003 Tanaman Penghijauan Glado Kantiang Batang
1 3 5 5 01 01 004 Tanaman Penghijauan Jati Putih Batang
1 3 5 5 01 01 005 Tanaman Hias dan Taman Cemara Eleven Batang
1 3 5 5 01 01 006 Tanaman Hias dan Taman Bogenvil Bonggol Besar Batang
1 3 5 5 01 01 007 Tanaman Hias dan Taman Bougenvil Batang
1 3 5 5 01 01 008 Tanaman Hias dan Taman Bougenvil Polybag
1 3 5 5 01 01 009 Tanaman Hias dan Taman Palm Ponix Batang
Palm Ekor Tupai tinggi 1 m batang
1 3 5 5 01 01 010 Tanaman Hias dan Taman Batang
kupas
1 3 5 5 01 01 011 Tanaman Hias dan Taman Nusa Indah Batang
1 3 5 5 01 01 012 Tanaman Hias dan Taman Pandan Bali Batang
1 3 5 5 01 01 013 Tanaman Hias dan Taman Euphobia Batang
1 3 5 5 01 01 014 Tanaman Hias dan Taman Mawar Batang
1 3 5 5 01 01 015 Tanaman Hias dan Taman Sikas Batang
1 3 5 5 01 01 016 Tanaman Hias dan Taman Kenanga Batang
1 3 5 5 01 01 017 Tanaman Hias dan Taman Bayam Merah Batang
1 3 5 5 01 01 018 Tanaman Hias dan Taman Teh Kuning Batang
1 3 5 5 01 01 019 Tanaman Hias dan Taman Teh Hijau Batang
1 3 5 5 01 01 020 Tanaman Hias dan Taman Jarum-Jarum Batang
1 3 5 5 01 01 021 Tanaman Hias dan Taman Lili Paris Batang
1 3 5 5 01 01 022 Tanaman Hias dan Taman Lantana Batang
1 3 5 5 01 01 023 Tanaman Hias dan Taman Bawang-Bawang Batang
1 3 5 5 01 01 024 Tanaman Hias dan Taman Kucai Batang
1 3 5 5 01 01 025 Tanaman Hias dan Taman Krokot Batang
1 3 5 5 01 01 026 Tanaman Hias dan Taman Gladi Merah Batang
1 3 5 5 01 01 027 Tanaman Hias dan Taman Bonsai Elemen Serut Batang
1 3 5 5 01 01 028 Tanaman Hias dan Taman Bonsai Elemen Cemara Udang Batang
1 3 5 5 01 01 029 Tanaman Hias dan Taman Sakura tinggi 1,5 m Batang
1 3 5 5 01 01 030 Tanaman Hias dan Taman Silver Tris Kanari Batang
1 3 5 5 01 01 031 Tanaman Hias dan Taman Agape panjang daun 60 - 80 cm Polybag
1 3 5 5 01 01 032 Tanaman Hias dan Taman Pacing Polybag
1 3 5 5 01 01 033 Tanaman Hias dan Taman Balik angin Thailand tinggi 25 cm Polybag
1 3 5 5 01 01 034 Tanaman Hias dan Taman Jasmine Polybag
1 3 5 5 01 01 035 Tanaman Hias dan Taman Sirih Gading Kuning Polybag
1 3 5 5 01 01 036 Tanaman Hias dan Taman Akalipa Polybag
1 3 5 5 01 01 037 Tanaman Hias dan Taman Asoka Daun Jeruk Polybag
1 3 5 5 01 01 038 Tanaman Hias dan Taman Lalang Putih Polybag
1 3 5 5 01 01 039 Tanaman Hias dan Taman Taiwan Beauty Polybag
1 3 5 5 01 01 040 Tanaman Hias dan Taman Patah Tulang Polybag
1 3 5 5 01 01 041 Tanaman Hias dan Taman Ros Merah Polybag

ASSET TETAP 1.3. Page 26 of 207


KEUNTUNGAN +
KODE NAMA BARANG SPESIFIKASI SATUAN HARGA DASAR INFLASI +
KEUNTUNGAN
1 2 3 4 5 6
1 3 5 5 01 01 042 Tanaman Hias dan Taman Haliander tinggi 1 m Batang
1 3 5 5 01 01 043 Tanaman Hias dan Taman Pucuk Merah 1,5 m Batang
1 3 5 5 01 01 044 Tanaman Hias dan Taman Gladiol Putih Polybag
1 3 5 5 01 01 045 Tanaman Hias dan Taman Rumput Bermuda M2
1 3 5 5 01 01 046 Tanaman Hias dan Taman Rumput Gajah Mini M2
1 3 5 5 01 01 047 Tanaman Hias dan Taman Rumput Swis M2
1 3 5 5 01 01 048 Tanaman Hias dan Taman Rumput Jepang M2
1 3 5 5 01 01 049 Tanaman Hias dan Taman Rumput Packing M2
1 3 5 5 01 01 050 Tanaman Hias dan Taman Kacang-kacangan Pot
1 3 5 5 01 01 051 Tanaman Hias dan Taman Airis Pot
1 3 5 5 01 01 052 Tanaman Hias dan Taman Spagety Pot
1 3 5 5 01 01 053 Tanaman Hias dan Taman Agape Pot
1 3 5 5 01 01 054 Tanaman Hias dan Taman Cemara Udang Btg
1 3 5 5 01 01 055 Tanaman Hias dan Taman Ketapang Kencana Btg
1 3 5 5 01 01 056 Tanaman Hias dan Taman Terembesi Btg
1 3 5 5 01 01 057 Tanaman Hias dan Taman Cemara Serut Btg
1 3 5 5 01 01 058 Tanaman Hias dan Taman Pohon Kurma Btg
1 3 5 5 01 01 059 Tanaman Hias dan Taman Palm Super Silver Teres Btg
1 3 5 5 01 01 060 Tanaman Hias dan Taman Balik angin Btg
1 3 5 5 01 01 061 Tanaman Hias dan Taman Melati Putih Btg

ASSET TETAP 1.3. Page 27 of 207


HARGA MAX

4,601,634,400
910,935,900
131,474,800
2,693,150,400
7,998,900
18,782,100
469,553,100
478,484,000
580,897,000
2,078,719,000
693,895,000
187,823,300
2,693,978,900
835,807,600
1,990,858,300
796,343,300
753,104,700
1,356,637,800
1,356,637,800
5,634,700
2,817,326,800
5,634,700
236,656,300
138,527,500
12,390,900
6,575,900
86,399,600
211,300,700
657,377,300
131,474,800
657,377,300
32,870,800
4,225,990,300
147,928,300
-
-

9,577,800

ASSET TETAP 1.3. Page 28 of 207


HARGA MAX

2,571,300

2,764,100

4,300,300

3,818,300

8,176,500

14,913,100

9,256,400

1,388,500

3,393,900

2,956,900

6,428,100

2,185,600

4,178,200

6,788,100

1,157,000

3,214,100

1,125,000

7,070,800

7,713,600

114,660,200
122,252,500
133,479,300

143,271,500

144,526,900
159,065,600

ASSET TETAP 1.3. Page 29 of 207


HARGA MAX

7
173,197,900
178,602,100
192,040,900
251,953,600
268,034,600
154,869,000
166,095,900
174,226,100
184,616,100
191,646,300
224,753,100
238,813,600
569,800,000

8,870,200

15,146,700

3,376,800
15,743,200
3,216,200
11,113,700
17,129,600
5,200,100
2,600,200
15,172,500
15,198,400
7,723,800
12,708,700
9,686,900
13,876,100

52,650,600

88,704,200

32,551,400

17,797,600

20,104,600

20,104,600

48,778,700
41,333,600
62,549,200
40,634,600

29,216,100

ASSET TETAP 1.3. Page 30 of 207


HARGA MAX

27,805,000

10,963,900

26,989,800

25,578,700

3,637,600

44,169,000

14,303,500

4,089,900

67,365,100

72,113,800

65,008,500

5,545,800
6,011,800

23,070,100

2,264,700

29,216,100

97,000
139,500
11,203,500

ASSET TETAP 1.3. Page 31 of 207


HARGA MAX

7
11,709,800
2,993,800
1,005,500
236,700
531,200
890,900
42,400
42,400
180,800
10,536,000
9,504,800
10,491,300

12,507,200

173,100
6,647,000
10,801,300
12,463,100
18,279,300
4,154,700
10,801,600
7,014,200
4,008,200
3,005,900
501,200
4,008,200
18,035,500
3,005,900
15,430,500
23,345,600
13,863,200
1,521,700
38,042,400
6,340,400
1,268,100
12,934,500
57,063,600
887,700
3,804,200
-
-
-
-
556,100
635,500
524,300
63,600
1,204,300
1,739,300
1,987,700
1,021,200
1,167,000
1,458,800
760,900
1,270,900
443,900
634,000
88,800

ASSET TETAP 1.3. Page 32 of 207


HARGA MAX

7
107,800
19,000
63,400
125,100
489,842,900
64,617,600
27,097,700
50,026,600
56,280,000
22,519,100
36,694,100
48,968,400
389,800
158,500
539,100
71,000
31,700
144,200
3,200
23,505,500
885,800
17,832,000
35,123,200
945,800
47,600
71,500
95,300
86,600
95,400
79,400
586,200
783,400
114,200
39,700
39,700
760,900
1,141,300
1,500

11,412,700

1,585,100
27,678,100
36,078,100
37,615,700

41,787,100

44,093,600
64,186,400
24,759,200
25,038,200
35,219,300
30,221,800
30,303,600

30,679,900

43,472,000

ASSET TETAP 1.3. Page 33 of 207


HARGA MAX

7
44,044,600
42,506,900
55,789,800
27,277,400
31,653,200
27,277,400
29,837,400
31,800,500
36,863,300
44,633,500
52,559,000
62,889,200

33,166,300

55,372,600

64,533,300

123,872,800

146,324,400
28,455,100
29,024,400
30,426,300
32,584,000
39,423,300
56,367,200
490,700
818,000
1,130,400
1,148,400
1,554,100
1,761,800
11,450,800
14,956,400
18,725,300
130,865,900
137,409,100
142,316,600
83,427,000
83,427,000
89,970,300
91,172,300
92,751,200
95,695,700
98,149,400
105,347,000
58,229,500
69,563,300
453,100
515,200
539,800
695,200
847,300
981,500
10,300
215,900

ASSET TETAP 1.3. Page 34 of 207


HARGA MAX

7
2,300
1,400
4,700

634,000

887,700
768,500
807,700
204,900
53,800
20,900
34,700
44,800
70,000
123,600
66,800
130,900
166,200
338,900
580,900
7,890,100
3,407,100
14,793,900
4,696,500
4,400
7,800
468,100
107,700
1,893,700
2,367,100

3,353,200

1,882,900
1,569,000
27,800
51,105,900
9,862,500
627,700
529,300
9,145,200
3,586,300
8,876,300
3,138,200
121,040,300
353,258,300
3,765,600
1,972,500
5,917,600
2,689,800
4,482,900
448,400
340,800
2,367,100
5,110,600

ASSET TETAP 1.3. Page 35 of 207


HARGA MAX

7
8,427,900
98,500
5,110,600
4,931,300
1,479,400
9,392,900
5,977,300
4,696,500
6,404,200
5,763,800
13,235,400
6,148,100
42,700
5,977,300
128,000
2,134,800
1,280,800
128,000
170,800
76,900
3,000
9,400
298,000
380,400
380,400
63,400
27,900
29,200
3,900
-
380,800
1,529,400
56,700
3,219,500
1,512,300
151,400
29,200
5,795,000
16,100
150,200
365,000
365,000
36,500
57,900
322,000
14,976,500
35,768,900
363,700
2,279,900
380,800
17,739,000
19,193,100
1,963,000
1,635,800

ASSET TETAP 1.3. Page 36 of 207


HARGA MAX

7
736,100
-
-

-
19,021,200
19,021,200
19,021,200
-
-
-
-

9,160,600

329,800

20,245,000

40,300
732,800
824,500
55,000
641,200
27,500
1,099,200
55,000
91,600
366,400
210,700
1,289,900
11,908,800
1,504,100
734,700
778,700
549,700
73,300
824,500
4,404,400
916,200
93,800
90,000
79,400
293,200
293,200
128,300
128,300
137,400
137,400
137,400
137,400
137,400
128,300
265,700
641,200
732,800

ASSET TETAP 1.3. Page 37 of 207


HARGA MAX

7
2,519,200
3,481,100
2,473,400
3,939,100
6,641,500

54,963,700

769,500
236,300
192,400

73,300

168,500

366,600
1,923,700
11,908,800
8,244,500

14,657,000

2,931,400

3,664,200

549,700
73,300
155,800

3,664,200

5,679,600

4,397,100

6,412,500

57,100
69,700
120,500
63,400
57,800
6,400
1,300
2,500
8,300
114,200
50,700
39,300
126,800
1,711,900
50,700

ASSET TETAP 1.3. Page 38 of 207


HARGA MAX

7
-
-
37,919,400
95,613,200
30,872,700
3,508,200
6,946,300
1,683,900
7,549,000
9,823,100
7,549,000
9,823,100
499,000
379,300
189,400
249,500
61,868,400
6,735,600
1,751,100
451,400
414,200
394,200
9,900
3,500
75,000
1,347,100
568,700
234,600
4,200
63,404,000
-
-
-

1,888,900

4,336,900

6,746,200

14,571,800
6,264,300
4,453,500
8,191,800
9,155,500
15,419,800
17,829,200
16,500,000
11,000,000
8,800,000
6,600,000
1,032,200
121,400
667,900
501,200
1,927,500
3,400,100
2,523,100
3,035,800
2,671,500

ASSET TETAP 1.3. Page 39 of 207


HARGA MAX

7
4,457,300
6,071,600
4,857,300
728,600
1,821,500
125,300
126,000
2,013,000
2,818,100
3,354,800
-
476,400
605,800
605,800
403,500
403,500
1,446,200
1,864,500
201,900
201,700
5,774,700
4,394,800
507,300
3,004,800
3,004,800
2,490,400
2,093,100
467,800
415,800
129,800
380,400
380,400
63,400
-
-
-
53,700
40,400
53,700
40,400
24,600
7,400
48,700
4,300
3,400
17,500
19,600
20,000
24,100
16,100
48,700
164,300
30,400
18,300
36,400

ASSET TETAP 1.3. Page 40 of 207


HARGA MAX

7
13,400
48,700
63,400
114,200
-
-
-
33,400
64,500
6,700
24,100
33,400
23,500
15,200
18,300
20,000
24,100
-
-
164,900
217,900
131,100
4,340,500
462,000
682,300
1,392,600
8,535,700
5,543,800
3,919,400
4,645,100
7,984,100
2,438,900

2,395,100

2,322,500
-
-
497,300
87,200
68,500
316,000
268,400
123,500
238,900
355,500
1,207,600
25,500
268,400
435,100
503,100
503,100
182,100
186,000
53,700
62,200
55,900

ASSET TETAP 1.3. Page 41 of 207


HARGA MAX

7
224,100
31,400
6,200
60,400
98,200
18,800
31,400
808,200
433,700
124,300
124,300
186,600
67,100
113,700
621,600
124,300
32,200
99,800
124,300
317,000
28,300
286,200
99,800
967,600
6,340,400
253,700
760,900
44,300
120,500
57,100
19,000
31,700
44,300
25,400
38,100
31,700
38,100
31,700
19,000
82,400
76,100
38,100
63,400
25,400
82,400
317,000
443,900
31,700
25,400
25,400
114,200
63,400
126,800
101,400
63,400
82,400
-

ASSET TETAP 1.3. Page 42 of 207


HARGA MAX

7
-

8,525,000

907,500
13,750,000
1,650,000
440,000
4,950,000
13,750,000
19,800,000
-
-
-
-
5,002,900
6,405,400
4,826,900
2,762,500

2,701,900

2,337,600
5,245,800
2,641,200
2,756,600
2,489,400
7,984,100
5,828,700
9,593,000
2,707,900

1,020,000

874,400
1,420,800
4,826,900
874,400
813,600
2,185,800
1,214,300
1,311,400
1,141,400
1,663,600
2,792,900
922,900
6,709,000
4,213,700
1,190,000
1,530,100
1,469,300
2,884,000
364,300
364,300
261,100
242,900
151,800
1,408,600
315,700
139,600
333,900

ASSET TETAP 1.3. Page 43 of 207


HARGA MAX

7
425,000
36,400
133,500
145,800
1,092,900
340,000
473,700
255,000
340,000
76,100
-
-
4,210,300
20,796,800
9,623,600
-
-
-
5,413,200
6,014,700
9,022,100
1,203,000
4,811,700
374,115,100
70,354,100
109,900,800
109,167,000
69,470,000
39,697,100
36,389,000
103,212,500
-
6,616,200
5,112,500
9,022,100
16,841,200
5,262,800
4,390,800
9,623,600
17,803,500
-
1,804,400
2,766,700
3,127,600
6,165,100
1,684,100
-
661,700
4,390,800
-
601,500
872,100
2,526,200
4,210,300
-
2,255,600
1,293,200
781,900
601,500
300,700

ASSET TETAP 1.3. Page 44 of 207


HARGA MAX

7
1,503,700
45,290,700
18,795,900
-
2,869,000
554,600
2,315,600
15,457,900
29,472,100
-

2,887,100

17,743,400

1,804,400

13,864,500
-
-
-
32,970,100
19,782,100
66,437,300
26,629,700
448,900
20,162,500
21,811,000
25,995,600
32,843,300
36,267,100
-
68,476,300
19,782,100
35,854,900
88,765,600
128,710,100
254,250,000
63,594,200
37,408,400
97,135,000
-
-
-
-
-

23,396,100

23,389,700

23,369,500

23,302,300
23,241,400
23,236,300

22,063,400

49,049,300

ASSET TETAP 1.3. Page 45 of 207


HARGA MAX

38,089,800

32,919,400

31,496,300

30,842,500

30,559,400

6,926,500

6,994,600

7,567,900

7,588,400

9,245,400

9,356,400

9,656,200

5,766,100
6,945,600
4,848,600
6,424,300
10,876,800
11,422,200
13,497,200
12,449,600
14,021,400
9,566,200
11,532,200
3,800,100
7,600,100
7,076,700
4,455,400
4,717,500
14,414,600
16,891,700
19,267,400
20,719,100
6,334,500
7,522,200
7,918,000
6,598,400
8,577,900
10,161,500
15,308,200
4,354,800
6,730,400
3,563,000

ASSET TETAP 1.3. Page 46 of 207


HARGA MAX

7
4,223,000
21,774,700
11,877,100
5,938,500
6,598,400
6,994,200
8,841,700
15,704,200
5,674,700
5,806,600
8,049,900
8,181,900
3,695,000
4,486,900
9,501,700
5,014,900
6,598,700
5,146,800
5,014,900
7,654,100
7,918,000
4,750,900
4,420,900
4,288,900
5,146,800
5,146,800
5,278,700
1,479,400
1,055,300
1,566,500
3,315,000
3,278,700
3,946,500
5,440,100
1,281,200
6,435,900
4,346,400
8,075,100
1,149,100
4,918,000
3,967,700
2,528,700
3,830,600
5,512,700
6,577,600
2,086,300
1,840,700
7,056,500
1,669,700
7,891,200
3,108,700
772,900
1,617,200
1,882,200

ASSET TETAP 1.3. Page 47 of 207


HARGA MAX

7
6,734,200

235,696,200
60,607,600
6,734,200
2,020,200
4,040,600
10,774,600
4,040,600

17,445,100
8,722,600
7,476,500
8,099,500
1,869,100
1,869,100
1,869,100
1,869,100
1,619,900
2,492,200
1,495,300
1,619,900
1,619,900
2,118,300
2,679,100
498,400
1,869,100
498,400
1,869,100
872,300
747,600
249,200
1,869,100
3,738,200
11,214,700
9,968,600
17,445,100
2,959,400

57,419,700
60,864,900
64,310,000
67,755,200
71,200,400
74,645,600
78,090,800
81,535,900
84,981,100
88,809,100
91,871,500
63,161,600
67,755,200
72,348,800

ASSET TETAP 1.3. Page 48 of 207


HARGA MAX

7
76,942,400
81,535,900
86,129,500
90,723,100
95,316,700
99,910,200
104,503,800
109,097,400
113,691,000
68,903,600
76,942,400
84,981,100
93,019,900
101,058,600
109,097,400
117,136,100
125,174,900
133,213,700
141,252,400
149,291,200
157,329,900
165,368,700
173,407,400
181,446,200
189,484,900
197,523,700
205,562,400
213,601,200

34,451,800
86,129,500
137,807,200
200,968,900
137,807,200
200,968,900
258,388,500

258,388,500

34,451,800
57,419,700
80,387,500
91,871,500
114,839,400
137,807,200

68,903,600

137,807,200

137,807,200

275,614,400

172,259,000

344,518,100

3,445,200
4,019,400
4,593,600

ASSET TETAP 1.3. Page 49 of 207


HARGA MAX

7
6,890,400
9,187,100
5,167,800
6,029,100
6,890,400
10,335,500
13,780,700
6,890,400
8,038,800
9,187,100
13,780,700
18,374,300
8,613,000
10,048,400
11,483,900
14,211,400
16,579,900
18,948,500
20,671,100
24,116,300
27,561,400
1,335,100
1,751,800
2,002,700
2,583,500
1,584,400
2,086,300
2,376,600
3,081,800
2,296,300
3,445,200
4,019,400
4,593,600
3,445,200
4,019,400
4,593,600
5,167,800

25,000,000
20,000,000
15,000,000

15,000,000
13,000,000
11,000,000

12,000,000
10,000,000
8,000,000

10,000,000
8,000,000
6,000,000

ASSET TETAP 1.3. Page 50 of 207


HARGA MAX

7
8,000,000
7,000,000
6,000,000

6,000,000
5,000,000
4,000,000

5,000,000
4,000,000
3,000,000

4,000,000
3,000,000
2,000,000

2,500,000
2,000,000
1,500,000

1,500,000
1,000,000
750,000

1,000,000
750,000
500,000

750,000
500,000
300,000

500,000
350,000
250,000

1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,500,000
1,250,000

ASSET TETAP 1.3. Page 51 of 207


HARGA MAX

7
1,000,000
750,000
500,000
350,000
750,000
500,000
350,000
750,000
500,000
350,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,000,000
750,000
500,000
1,500,000
1,250,000
1,000,000
650,000
650,000
650,000
750,000
500,000
350,000
300,000
300,000
300,000
2,000,000
1,500,000
1,000,000
500,000
2,000,000
1,500,000
1,000,000
500,000
2,000,000
1,500,000
1,000,000
500,000
500,000
2,000,000
1,500,000
1,000,000
500,000
500,000
2,000,000
1,500,000
1,000,000
500,000
500,000
2,000,000
1,500,000
1,000,000

ASSET TETAP 1.3. Page 52 of 207


HARGA MAX

7
500,000
500,000
1,000,000
750,000
500,000
250,000
3,000,000
2,000,000
1,000,000
500,000
4,000,000
3,000,000
2,000,000
1,000,000

28,900
28,900
28,900
9,500
47,000
270,900
21,800
20,500
48,500

393,800

18,700
37,600
18,700
28,100
64,300
45,500
3,200
3,200
3,200
3,200
4,000
3,200
3,200
3,200
3,200
61,400
328,100
328,100
85,300
2,428,100
262,500
19,700
9,800
9,800
10,200
9,800
5,300
3,900
2,600
16,400
14,200

ASSET TETAP 1.3. Page 53 of 207


HARGA MAX

7
85,300
328,100
9,800
77,800
71,900
97,200
84,200
73,900
4,700
10,400
10,400
134,800
1,944,100
414,700
93,300
972,000
13,500
67,400
6,700
6,700

ASSET TETAP 1.3. Page 54 of 207


LAMPIRAN I KEPUTUSAN BUPATI TAPANULI SELATAN
NO :
TANGGAL :

STANDAR SATUAN HARGA

KODE NAMA BARANG SPESIFIKASI SATUAN HARGA


DASAR

1 2 3 4 5
1 ASSET
1 1 ASSET LANCAR
1 1 7 PERSEDIAAN
1 1 7 01 BARANG PAKAI HABIS
1 1 7 01 01 BAHAN
1 1 7 01 01 01 BAHAN BANGUNAN DAN KONSTRUKSI
1 1 7 01 01 01 001 Batu Kali Bulat (Quary) m3 142,553
1 1 7 01 01 01 001 Batu Kali Belah (Quary) m3 203,862
1 1 7 01 01 01 002 Batu Gunung (Quary) m 3
107,330
1 1 7 01 01 01 003 Koral (Quary) m 3
160,996
1 1 7 01 01 01 004 Kerikil Sungai Royalty (Quary) m 3
171,712
1 1 7 01 01 01 005 Kerikil Galian Royalty (Quary) m3 171,712
1 1 7 01 01 01 006 Kerikil Kasar (Quary) m 3
171,712
1 1 7 01 01 01 007 Kerikil Halus (Quary) m 3
168,722
1 1 7 01 01 01 008 Tanah Urug (Quary) m 3
97,860
1 1 7 01 01 01 009 Sirtu Royalty (Quary) m3 142,553
1 1 7 01 01 01 010 Pasir Pasangan (Quary) m3 171,712
1 1 7 01 01 01 011 Pasir Ayak Untuk Beton/Pasir Aspal (Quary) m 3
142,553
1 1 7 01 01 01 012 Pasir Urug (Quary) m 3
130,342
1 1 7 01 01 01 013 Tanah Timbunan Pilihan (Quary) m 3
99,605
1 1 7 01 01 01 014 Spilyt (Quary) m3 222,387
1 1 7 01 01 01 015 Batu Belah 5 - 7 cm (Manual) (Quary) m3 253,041
1 1 7 01 01 01 016 Batu Pecah 3 - 5 cm (Manual) (Quary) m 3
298,815
1 1 7 01 01 01 017 Batu Pecah 2 - 3 cm (Manual) (Quary) m 3
344,920
1 1 7 01 01 01 018 Batu Pecah 2 - 3 cm ( Stone Crusher) (Quary) m3 410,714
1 1 7 01 01 01 019 Batu Pecah 1 - 2 cm ( Stone Crusher) m3 455,407
Batu Pecah 0,5 - 1 cm (Mata Ayam) ( Stone Crusher) m 3

1 1 7 01 01 01 020 Batu Bata  Uk. Standard Buah m3 748


1 1 7 01 01 01 021 Abu Batu ( Stone Crusher) Kg 3,073
1 1 7 01 01 01 022 Aspal Biasa Kg 11,215
1 1 7 01 01 01 023 Solar Industri Liter 10,550
1 1 7 01 01 01 024 Minyak Tanah/Minyak Bakar Liter 7,144
1 1 7 01 01 01 025 Residu Liter 11,547
1 1 7 01 01 01 026 Pertamax Liter 9,512
1 1 7 01 01 01 027 Premium Liter 5,548
1 1 7 01 01 01 001 Batu Granito Kg 7,144
1 1 7 01 01 01 002 Blok Beton (Tipe Tapak Kuda) Buah 6,812
1 1 7 01 01 01 003 Blok Beton (Tipe Batu Bata) Buah 4,071

ASSET LANCAR 1.1 Page 55 of 207


1 1 7 01 01 01 004 Batu Alam m2 384,296
1 1 7 01 01 01 005 Batu Tempel m2
384,296
1 1 7 01 01 01 006 Air Liter 29
1 1 7 01 01 01 007 Akustik Ukuran 30x60 cm Lembar 8,806
1 1 7 01 01 01 008 Ampelas m2 15,534
1 1 7 01 01 01 009 Asbes 1x1 m Lembar 24,590
1 1 7 01 01 01 010 Asbes Gelombang Lembar 26,915
1 1 7 01 01 01 011 Aluminium Foil m2 10,965
1 1 7 01 01 01 012 Bak Cuci Piring Stainless Stell ( 1 Bak ) Buah 433,060
1 1 7 01 01 01 013 Bak Cuci Piring Stainless Stell ( 2 Bak ) Buah 694,990
1 1 7 01 01 01 014 Bak Fibreglass (Bungkus Keramik) Buah 532,831
1 1 7 01 01 01 015 Bak KIP Buah 3,558,938
1 1 7 01 01 01 016 Bambu dia (6-10/600cm) Btg 95,451
1 1 7 01 01 01 017 Besi Beton Kg 21,932
1 1 7 01 01 01 018 Besi SikuL.30.30.0 kg 454,584
1 1 7 01 01 01 019 Besi Siku 40x40x4 mm kg 27,092
1 1 7 01 01 01 020 Besi Girder Galvanis Kg 34,656
1 1 7 01 01 01 021 Besi Beton Ulir Kg 28,245
1 1 7 01 01 01 022 Besi Profil WF Kg 25,171
1 1 7 01 01 01 023 Besi Strip Kg 28,245
1 1 7 01 01 01 024 Besi Strip m 14,122
1 1 7 01 01 01 025 Besi Baja Canal Kg 26,500
1 1 7 01 01 01 026 Besi Baja C./Besi Baja L Kg 25,171
1 1 7 01 01 01 027 Besi Hollow 20x40 mm Btg 27,995
1 1 7 01 01 01 028 Besi Hollow 30x40 mm Btg 38,961
1 1 7 01 01 01 029 Suspension Rop Clip 3 mm m 4,486
1 1 7 01 01 01 030 Mur + Ring Buah 1,246
1 1 7 01 01 01 031 Cat Untuk Kayu Besi Kg 51,340
1 1 7 01 01 01 032 Cat Dasar Kg 18,110
1 1 7 01 01 01 033 Cat Meni Perak Kg 70,695
1 1 7 01 01 01 034 Cat Tembok Kg 22,112
1 1 7 01 01 01 035 Cat Tembok Dulux Kg 130,092
1 1 7 01 01 01 036 Cat Tembok Danabrite Kg 30,737
1 1 7 01 01 01 037 Cat Genteng Kg 59,148
1 1 7 01 01 01 038 Dempol Beton Kg 19,854
1 1 7 01 01 01 039 Dempol Kayu Kg 17,529
1 1 7 01 01 01 040 Door Closer Buah 59,646
1 1 7 01 01 01 041 Door Holder Set 59,065
1 1 7 01 01 01 042 Door Stop Buah 59,065
1 1 7 01 01 01 043 Engsel Angin (Type paha ayam) Stainless Stell Set 26,833
1 1 7 01 01 01 044 Engsel Jendela (Kuningan 3 ") Buah 14,039
1 1 7 01 01 01 045 Engsel Jendela (Kuningan 4") Buah 19,854
1 1 7 01 01 01 046 Engsel Pintu Besar Set 59,646
1 1 7 01 01 01 047 Flincote Kg 38,048
1 1 7 01 01 01 048 Floor Drain Kuningan Buah 23,094
1 1 7 01 01 01 049 Formika Lembar 184,090
1 1 7 01 01 01 050 Gypsum Board 120x240x0,9 cm Lembar 119,210
1 1 7 01 01 01 051 Rangka Furing Btg 44,943
1 1 7 01 01 01 052 Y. Engsel (Gantungan Furing) Btg 38,048
1 1 7 01 01 01 053 Grendel Jendela Buah 5,649
1 1 7 01 01 01 054 Ijuk Kg 46,853
1 1 7 01 01 01 055 Kaca Nako m2 228,617
1 1 7 01 01 01 056 Kaca Cermin m2 173,089
1 1 7 01 01 01 057 Kaca Polos 5 mm m2
212,252
1 1 7 01 01 01 058 kaca Nako 6 daun Polos m2
141,889

ASSET LANCAR 1.1 Page 56 of 207


1 1 7 01 01 01 059 Kait Angin Buah 3,489
1 1 7 01 01 01 060 Kapur Pasang m3 1,005,019
1 1 7 01 01 01 061 Kapur Sirih Kg 1,911
1 1 7 01 01 01 062 Kawat Beton Kg 21,682
1 1 7 01 01 01 063 kawat Duri Roll 177,528
1 1 7 01 01 01 064 kawat Harmonika m2 52,917
1 1 7 01 01 01 065 kawat nyamuk m2 22,014
1 1 7 01 01 01 066 Kawat Bronjong (Pabrikan) Dia. 3 mm (0,50X1.00X3.00) Krj 646,000
1 1 7 01 01 01 067 Kawat Bronjong (Pabrikan) Dia. 3 mm (0,50X1.00X2.00) Krj 515,280
1 1 7 01 01 01 068 Box culvert 40 x 40 x 100 K 350 Buah 808,260
1 1 7 01 01 01 069 Box culvert 50 x 50 x 100 K 350 Buah 1,071,980
1 1 7 01 01 01 070 Box culvert 60 x 60 x 100 K 350 Buah 1,386,696
1 1 7 01 01 01 071 Box culvert 80 x 80 x 100 K 350 Buah 2,352,580
1 1 7 01 01 01 072 Box culvert 100 x 100 x 100 K 350 Buah 3,112,200
1 1 7 01 01 01 073 Box culvert 120 x 120 x 100 K 350 Buah 4,175,060
1 1 7 01 01 01 074 Box culvert 150 x 150 x 100 K 350 Buah 7,402,400
1 1 7 01 01 01 075 Box culvert 200 x 200 x 100 K 350 Buah 10,667,740
1 1 7 01 01 01 076 kawat las Kg 162,076
1 1 7 01 01 01 077 Kayu kapur m3 9,337,757
1 1 7 01 01 01 078 Kayu meranti (balok kelas I) m3 6,280,331
1 1 7 01 01 01 079 Kayu keras Setempat m3
6,159,543
1 1 7 01 01 01 080 Kayu 5/7 Btg 86,230
1 1 7 01 01 01 081 Kayu keras dia 8-10/4m Btg 197,133
1 1 7 01 01 01 082 Kayu bekisting/perancah m3 4,098,738
1 1 7 01 01 01 083 Kayu cetakan dia 8-10/400 cm Btg 38,463
1 1 7 01 01 01 084 Kayu jati m3 11,625,924
1 1 7 01 01 01 085 Kayu jati papan 4/20 Lembar 186,001
1 1 7 01 01 01 086 Kayu papan 4/20 Lembar 98,525
1 1 7 01 01 01 087 Kayu ulin, Balok m3 4,297,624
1 1 7 01 01 01 088 Kayu Ulin, Papan Lembar 68,785
1 1 7 01 01 01 089 Kayu Papan Rider m' 31,900
1 1 7 01 01 01 090 Kayu bulat Btg 48,100
1 1 7 01 01 01 091 Kosen UPVC m 343,092
1 1 7 01 01 01 092 KloSet Duduk tanpa Tangki Buah 509,404
1 1 7 01 01 01 093 KloSet Duduk + Tangki Buah 2,807,448
1 1 7 01 01 01 094 KloSet Jongkok Setara TOTO Buah 384,296
1 1 7 01 01 01 095 Kosen Jendela Aluminium m' 53,250
1 1 7 01 01 01 096 Kran Air Buah 24,174
1 1 7 01 01 01 097 Kran Air Paruh Angsa Buah 219,562
1 1 7 01 01 01 098 Kuas Buah 13,707
1 1 7 01 01 01 099 Kunci Selot Buah 13,707
1 1 7 01 01 01 100 Kunci Tanam 6" Buah 131,421
1 1 7 01 01 01 101 Kunci Tanam Antik Buah 290,008
1 1 7 01 01 01 102 Kunci Tanam 9" Buah 156,606
1 1 7 01 01 01 103 Asbes Lembar 24,590
1 1 7 01 01 01 104 Lat Asbes m' 1,828
1 1 7 01 01 01 105 Lem Kayu Liter 49,429
1 1 7 01 01 01 106 List Kayu Profil m' 5,981
1 1 7 01 01 01 107 List Profil Gypsum m' 21,516
1 1 7 01 01 01 108 ListPlank (Fibre Glass) + Kosen + Cat m' 83,572
1 1 7 01 01 01 109 Markis Seng m' 40,540
1 1 7 01 01 01 110 Minyak Bekisting Liter 13,707
1 1 7 01 01 01 111 Minyak Cat Kg 42,616
1 1 7 01 01 01 112 Paku Atap Kg 43,032

ASSET LANCAR 1.1 Page 57 of 207


1 1 7 01 01 01 113 Paku Biasa Kg 20,769
1 1 7 01 01 01 114 Paku Ulir (Seng Genteng) Kg 35,306
1 1 7 01 01 01 115 Paku Skrup 3,5 inch Kg 35,306
1 1 7 01 01 01 116 Pembersih Kg 30,072
1 1 7 01 01 01 117 Pengencer (Tinner) Liter 29,657
1 1 7 01 01 01 118 Perekat Kg 49,429
1 1 7 01 01 01 119 Pintu Panel (Fibre Glass )+ Kosen + Cat Unit 2,277,285
1 1 7 01 01 01 120 Pintu Aluminium m2 911,728
1 1 7 01 01 01 121 Pintu Indoor Classic + kosen m2 2,208,086
1 1 7 01 01 01 122 Pintu Lipat m2 2,198,780
1 1 7 01 01 01 123 Pintu Fibre Plastik KM/WC Set 384,296
1 1 7 01 01 01 124 Plamur Tembok Kg 42,616
1 1 7 01 01 01 125 Plitur dan Vermis Liter 61,557
1 1 7 01 01 01 126 Triplek 4 mm Lembar 90,633
1 1 7 01 01 01 127 Triplek 6 mm Lembar 154,433
1 1 7 01 01 01 128 Triplek 9 mm Lembar 214,578
1 1 7 01 01 01 129 rangka Baja ringan untuk seng m2 248,887
1 1 7 01 01 01 130 rangka baja ringan untuk genteng m2 257,527
1 1 7 01 01 01 131 rabung seng m' 23,593
1 1 7 01 01 01 132 rabung zincalume tipe A 770 m' 31,900
1 1 7 01 01 01 133 Rabung Genteng Seng 100 cm m' 70,778
1 1 7 01 01 01 134 Rooling Door Besi m2 1,132,786
1 1 7 01 01 01 135 Rolling Door Aluminium m2 522,780
1 1 7 01 01 01 136 roster / Kerawang Buah 16,365
1 1 7 01 01 01 137 Semen PC Warna Kg 3,572
1 1 7 01 01 01 138 semen Porland Kg 1,744
1 1 7 01 01 01 139 seng genteng 0,80 x 1,05 (tekstur pasir) tebal 035 mm Lembar 164,485
1 1 7 01 01 01 140 Zincalume Tipe A 770 (Warna) m2 80,664
1 1 7 01 01 01 141 seng gelombang 7 kk, 11 parit Lembar 80,332
1 1 7 01 01 01 142 seng plat Lembar 17,944
1 1 7 01 01 01 143 seng plat 3'x6 BJLS 28 Lembar 94,537
1 1 7 01 01 01 144 Soda Api Kg 25,005
1 1 7 01 01 01 145 Sunscreem Alluminium m2 1,567,508
1 1 7 01 01 01 146 Talang Seng Plat m' 40,540
1 1 7 01 01 01 147 Talang Plastik m' 29,159
1 1 7 01 01 01 148 Sambungan Talang Plastik Buah 16,947
1 1 7 01 01 01 149 Gantungan Talang Plastik Buah 8,723
1 1 7 01 01 01 150 Cocor Bebek Plastik Buah 8,058
1 1 7 01 01 01 151 Urinoir Keramik Standar Buah 1,912,012
1 1 7 01 01 01 152 Keramik 10 x20 cm (kw. I) Buah 1,661
1 1 7 01 01 01 153 Keramik 20x20 cm (kw. I) Buah 3,289
1 1 7 01 01 01 154 Keramik 10 x25 cm (kw. I) Buah 4,403
1 1 7 01 01 01 155 Keramik 20x45 cm (kw.I) Buah 8,473
1 1 7 01 01 01 156 Keramik 30x30 cm (kw. I) Buah 6,812
1 1 7 01 01 01 157 Keramik 30x60 cm (kw. I) Buah 19,771
1 1 7 01 01 01 158 Keramik 40x40 cm (kw.I) Buah 15,037
1 1 7 01 01 01 159 Keramik 50x50 cm (kw.I) Buah 37,632
1 1 7 01 01 01 160 Keramik 60x60 cm (kw. I) Buah 55,908
1 1 7 01 01 01 161 Granito 60x60 cm m2 279,957
1 1 7 01 01 01 162 Keramik Ikat Pinggang Bermotif m' 30,488
1 1 7 01 01 01 163 Step Nosing 7,5x30 cm Buah 2,243
1 1 7 01 01 01 164 Plint Keramik 10x60cm Buah 9,388
1 1 7 01 01 01 165 Venetions Blinds m2 287,682
1 1 7 01 01 01 166 Wall Paper m2 354,058
1 1 7 01 01 01 167 Wastafel Stainless Buah 512,063

ASSET LANCAR 1.1 Page 58 of 207


1 1 7 01 01 01 168 Water Drain + asesories Set 124,610
1 1 7 01 01 01 169 Water Stop Lebar 100 mm Buah 680,702
1 1 7 01 01 01 170 Water Stop Lebar 150 mm Buah 1,116,587
1 1 7 01 01 01 171 Water Stop Lebar 200 mm Buah 1,351,517
1 1 7 01 01 01 172 Water Stop Lebar 230-320 mm Buah 1,554,631
1 1 7 01 01 01 173 Window Holder Buah 16,449
1 1 7 01 01 01 174 GLV ø 40 mm Buah 401,244
1 1 7 01 01 01 175 GLV ø 65 mm Buah 746,578
1 1 7 01 01 01 176 FCO (Floor Clean Out) 100 mm m' 153,686
1 1 7 01 01 01 177 Hangger/Support Pcs 2,741
1 1 7 01 01 01 178 Lem PVC Tube 10,965
1 1 7 01 01 01 179 Box Lampu Besar Buah 43,092
1 1 7 01 01 01 180 Box Lampu Kecil Buah 292,600
1 1 7 01 01 01 181 Box KWH Buah 1,484,280
1 1 7 01 01 01 182 panel P-1 m' 14,278,284
1 1 7 01 01 01 183 panel P-3 Buah 147,792,898
1 1 7 01 01 01 184 Lampu TL 1X40 W Set 247,059
1 1 7 01 01 01 185 Lampu TL 2X40 W Buah 496,778
1 1 7 01 01 01 186 Lampu PLC 20 W Buah 38,463
1 1 7 01 01 01 187 Lampu PLC 40 W Buah 65,877
1 1 7 01 01 01 188 Lampu Downlight 10 W Buah 285,439
1 1 7 01 01 01 189 Hannochs XL 42 W Putih Buah 47,500
1 1 7 01 01 01 190 Hannochs XL 45 W Kuning Buah 50,920
1 1 7 01 01 01 191 Hannochs XL 45 W Putih Buah 48,640
1 1 7 01 01 01 192 Hannochs XL 65 W Kuning Buah 88,920
1 1 7 01 01 01 193 Hannochs XL 65 W Putih Buah 79,040
1 1 7 01 01 01 194 Hannochs XL 85 W Kuning Buah 104,880
1 1 7 01 01 01 195 Mercury SON-T 150 W Buah 120,840
1 1 7 01 01 01 196 Mercury SON-T 250 W Buah 140,600
1 1 7 01 01 01 197 Mercury SON-T 400 W Buah 167,200
1 1 7 01 01 01 198 Mercury SON-T 1000 W Buah 601,046
1 1 7 01 01 01 199 Bola Lampu SON ED 100 W Buah 105,640
1 1 7 01 01 01 200 Lampu Selang (P=10 mtr) Buah 133,000
1 1 7 01 01 01 201 Lampu Selang LED Single Colour m 44,080
1 1 7 01 01 01 202 Lampu Selang LED Multi Colour m 48,640
1 1 7 01 01 01 203 Lampu Neon Warna Warni P 120 cm bh 136,800
1 1 7 01 01 01 204 Lampu Sorot LED 20 W bh 247,000
1 1 7 01 01 01 205 Lampu Sorot LED 50 W bh 476,900
1 1 7 01 01 01 206 Lampu Sorot LED 100 W bh 665,000
1 1 7 01 01 01 207 Lampu Flip-Flop (P=10 mtr) Buah 117,800
1 1 7 01 01 01 208 Photo Cell Selcon 10 A Buah 209,000
1 1 7 01 01 01 209 Kabel Tick Uk. 2 x 10 mm2 Mtr 7,600
1 1 7 01 01 01 210 Kabel Tick Uk. 2 x 16 mm2 Mtr 11,400
1 1 7 01 01 01 211 Kabel NYA Uk. 1 x 1,5 mm2 Mtr 4,446
1 1 7 01 01 01 212 Kabel NYA Uk. 1 x 2,5 mm2 Mtr 4,940
1 1 7 01 01 01 213 Kabel NYM Uk. 2 x 2,5 mm2 Mtr 13,300
1 1 7 01 01 01 214 Kabel NYM Uk. 2 x 4 mm2 Mtr 25,650
1 1 7 01 01 01 215 Kabel NYM Uk. 3 x 2,5 mm2 Mtr 10,260
1 1 7 01 01 01 216 Kabel NYFGBY Uk. 2 x 4 mm2 Mtr 39,900
1 1 7 01 01 01 217 Kabel NYFGBY Uk. 2 x 6 mm2 Mtr 49,020
1 1 7 01 01 01 218 Kabel NYFGBY Uk. 2 x 10 mm2 Mtr 59,660
1 1 7 01 01 01 219 Kabel NYFGBY Uk. 2 x 16 mm2 Mtr 99,674
1 1 7 01 01 01 220 Kabel NYFGBY Uk. 2 x 25 mm2 Mtr 70,300
1 1 7 01 01 01 221 Kabel NYFGBY Uk. 3 x 16 mm2 Mtr 108,300
1 1 7 01 01 01 222 Kabel NYFGBY Uk. 4 x 4 mm2 Mtr 46,170
1 1 7 01 01 01 223 Kabel NYFGBY Uk. 4 x 6 mm2 Mtr 58,140

ASSET LANCAR 1.1 Page 59 of 207


1 1 7 01 01 01 224 Kabel NYFGBY Uk. 4 x 10 mm2 Mtr 94,886
1 1 7 01 01 01 225 Kabel NYFGBY Uk. 4 x 16 mm2 Mtr 111,340
1 1 7 01 01 01 226 Kabel NYFGBY Uk. 4 x 25 mm2 Mtr 123,500
1 1 7 01 01 01 227 Kap Lampu Jalan Umum Uk. Kecil Buah 323,000
1 1 7 01 01 01 228 Kap Lampu Jalan Umum Uk. Besar Buah 513,000
1 1 7 01 01 01 229 Kap Lampu Jalan Umum Philps HRC 511 Buah 1,197,000
1 1 7 01 01 01 230 Kap Lampu SPP 166 Philips 150 Watt (Include : Bola Buah 1,710,000
Lampu, Ballast, Ignitor dan Kondensator)
1 1 7 01 01 01 231 Kap Lampu SPP 166 Philips 250 Watt (Include : Bola Buah 2,014,000
Lampu, Ballast, Ignitor dan Kondensator)
1 1 7 01 01 01 232 LPJU Solar Cell 40 W Single Armature (Komplit : Lampu, Buah 12,160,000
Tiang 9 m, Panel Solar Cell, Batteray, Box, Galvanis,
Aksesoris)

1 1 7 01 01 01 233 LPJU Solar Cell 40 W Double Armature (Komplit : Lampu, Buah 18,620,000
Tiang 9 m, Panel Solar Cell, Batteray, Box, Galvanis,
Aksesoris)

1 1 7 01 01 01 234 Box Lampu sorot (Komplete Bola M Son-T 400 W) Buah 1,254,000
1 1 7 01 01 01 235 Lampu Hias (Model Bulat, D = 30 cm) Buah 285,000
1 1 7 01 01 01 236 Lampu Taman Ornamen Buah 148,200
1 1 7 01 01 01 237 Deaden Assembly Buah 12,768
1 1 7 01 01 01 238 Beugel/ Klem + Baut + Mur Buah 45,600
1 1 7 01 01 01 239 Beugel/ Klem + Baut + Mur Tiang Oktagonal Set 64,600
1 1 7 01 01 01 240 Paralel Tick Set 24,700
1 1 7 01 01 01 241 Isolasi/Lakban Buah 4,560
1 1 7 01 01 01 242 Lengan Ornamen LPJU Pipa Galvanis D= 1,5 ", T = 3 mm, Buah 231,420
P = 2 Mtr
1 1 7 01 01 01 243 Lengan Ornamen LPJU Pipa Galvanis D= 1,5 ", T = 3 mm, Buah 308,940
P = 2,5 Mtr
1 1 7 01 01 01 244 Lengan Ornamen LPJU Pipa Galvanis D= 1,5 ", T = 3 mm, Buah 362,520
P = 3 Mtr
1 1 7 01 01 01 245 Tiang LPJU (P = 9 Mtr) + Selubung Tiang Buah 3,389,600
1 1 7 01 01 01 246 Tiang LPJU Oktagonal (P = 9 Mtr) + Base Plate + Angkur Buah 4,218,000
1 1 7 01 01 01 247 Tiang LPJU Antik Etnik Daerah Lengan Ganda (P = 9 Mtr) Buah 13,756,000
+ Base Plate + Angkur
1 1 7 01 01 01 248 Tiang Ornamen Lampu Taman ( P = 2,5 - 4 Mtr ) Buah 2,622,000
1 1 7 01 01 01 249 Klem Tiang Stainless/ Stainless Steel Strip Set 34,200
1 1 7 01 01 01 250 Spool Isolator + Klem + Baut + Mur Set 45,600
1 1 7 01 01 01 251 Box Pengendali KWh Meter Uk. Kecil Buah 1,132,400
1 1 7 01 01 01 252 Box Pengendali KWh Meter Uk. Sedang Buah 1,444,000
1 1 7 01 01 01 253 Magnetic Kontaktor 1 Phase 25 A Unit 247,000
1 1 7 01 01 01 254 Magnetic Kontaktor 1 Phase 30 A Unit 361,000
1 1 7 01 01 01 255 Magnetic Kontaktor 1 Phase 40 A Unit 391,780
1 1 7 01 01 01 256 Magnetic Kontaktor 1 Phase 50 A Unit 619,400
1 1 7 01 01 01 257 Magnetic Kontaktor 1 Phase 60 A Unit 779,000
1 1 7 01 01 01 258 Clevis, Baut dan Mur Set 53,200
1 1 7 01 01 01 259 Ballast 150 Watt Buah 163,400
1 1 7 01 01 01 260 Ballast 250 Watt Buah 224,580
1 1 7 01 01 01 261 Ballast 400 Watt Buah 419,900
1 1 7 01 01 01 262 Ballast 1000 Watt Buah 1,482,000
1 1 7 01 01 01 263 Ignitor 150 Watt Buah 47,500
1 1 7 01 01 01 264 Ignitor 250 Watt Buah 51,300
1 1 7 01 01 01 265 Ignitor 400 Watt Buah 62,700
1 1 7 01 01 01 266 Ignitor 1000 Watt Buah 80,370
1 1 7 01 01 01 267 Kondensator 150 Watt Buah 55,100
1 1 7 01 01 01 268 Kondensator 250 Watt Buah 62,700
1 1 7 01 01 01 269 Kondensator 400 Watt Buah 74,100

ASSET LANCAR 1.1 Page 60 of 207


1 1 7 01 01 01 270 Kondensator 1000 Watt Buah 95,000
1 1 7 01 01 01 271 MCB 6 - 20 A Buah 91,390
1 1 7 01 01 01 272 MCB 25 A Buah 95,570
1 1 7 01 01 01 273 Fitting Gantung Buah 5,206
1 1 7 01 01 01 274 Fitting Keramik Buah 41,686
1 1 7 01 01 01 275 Fitting Lampu Segi 8 Buah 7,790
1 1 7 01 01 01 276 Lampu Jalan LED 40 W DC Bh 3,325,000
1 1 7 01 01 01 277 Modul Surya Polycristalline 150 Wp Bh 2,166,000
1 1 7 01 01 01 278 Solar Charge Controller Bh 813,960
1 1 7 01 01 01 279 Batteray VRLA 100 Ah Bh 2,622,000
1 1 7 01 01 01 280 Kotak Batteray (Panel Listrik) Bh 1,238,040
1 1 7 01 01 01 281 Bracket Panel Surya 150-200 Wp Bh 782,040
1 1 7 01 01 01 282 Kabel & ACC SET PJU Set 469,300
1 1 7 01 01 01 283 Angkur (P = 80 cm, D = 24 mm) Buah 21,660
1 1 7 01 01 01 284 Angkur (P = 100 cm, D = 24 mm) Buah 23,940
1 1 7 01 01 01 285 Kanstin K.175 Uk. 0,4 x 0,3 x 0,13 x 0,15 Buah 45,410
1 1 7 01 01 01 286 Scotch Light Putih Engineering Grade m2 487,140
1 1 7 01 01 01 287 Scotch Light Warna Engineering Grade m2 487,140
1 1 7 01 01 01 288 Calci Board 1200x2400x10 mm lbr 261,526
1 1 7 01 01 01 289 Calci Board 1200x2400x12 mm lbr 395,612
1 1 7 01 01 01 290 Floor Drain TOTO bh 253,281
1 1 7 01 01 01 291 Profil kaca 5 mm m2 235,945
1 1 7 01 01 01 292 Kaca Rayben 5 mm m2 266,899
1 1 7 01 01 01 293 Kaca Rayben 8 mm m2 872,220
1 1 7 01 01 01 294 Kayu Keras kelas II m3 6,976,721
1 1 7 01 01 01 295 Kayu Kelas III m3 5,299,788
1 1 7 01 01 01 296 Kayu Kelas IV m3 3,665,687
1 1 7 01 01 01 297 Kloset Jongkok automatic TOTO bh 2,743,747
1 1 7 01 01 01 298 Daun UPVC m2 635,974
1 1 7 01 01 01 299 Bingkai UPVC m 215,967
1 1 7 01 01 01 300 Kosen UPVC m 381,136
1 1 7 01 01 01 301 Kran Air TOTO bh 156,191
1 1 7 01 01 01 302 Rangka aluminium m 58,880
1 1 7 01 01 01 303 Seng Genteng 0,75 x 1,2 (4 susun) tebal 0,3 mm lbr 106,410
1 1 7 01 01 01 304 Keramik 20x25 cm (kw. I) bh 4,914
1 1 7 01 01 01 305 Keramik 25x25 cm (kw. I) bh 4,891
1 1 7 01 01 01 306 Keramik 25x40 cm (kw. I) bh 9,412
1 1 7 01 01 01 307 Wastafel TOTO bh 1,574,568
1 1 7 01 01 01 308 Seal Tape Bh 6,091
1 1 7 01 01 01 309 Hangger / support Pcs 3,046
1 1 7 01 01 01 310 Kabel NYY 4x10 mm M' 1,647
1 1 7 01 01 01 311 Kabel NYM 3x2,5 Putih (50 m) M' 14,352
1 1 7 01 01 01 312 Saklar tunggal Bh 25,844
1 1 7 01 01 01 313 Saklar ganda Bh 42,184
1 1 7 01 01 01 314 Saklar triple Bh 66,278
1 1 7 01 01 01 315 Pipa Flexible Listrik (30 m) M' 3,001
1 1 7 01 01 01 316 Lampu Hias Kecil Buah 150,000
1 1 7 01 01 01 317 Lampu Hias Besar Buah 200,000
1 1 7 01 01 01 318 Tudung Saji Vitrit Buah 120,000
1 1 7 01 01 01 319 Tudung Saji Cacing Buah 150,000
1 1 7 01 01 01 320 Rak Sepatu Buah 350,000
1 1 7 01 01 01 321 Keranjang Tempat Ikan Buah 40,000
1 1 7 01 01 01 322 Beton K-300 M3 2,437,479
1 1 7 01 01 01 323 Urugan Porus M3 155,970
1 1 7 01 01 01 324 Mat. Pilihan M3 18,469
1 1 7 01 01 01 325 Urugan Pilihan M3 47,867

ASSET LANCAR 1.1 Page 61 of 207


1 1 7 01 01 01 326 Bahan pengaman tebing galian M3 1,191,926
1 1 7 01 01 01 327 Bahan pilihan (M09) M3 18,469
1 1 7 01 01 01 328 Aggregat A M3 301,264
1 1 7 01 01 01 329 Aggregat B M3 291,352
1 1 7 01 01 01 330 Lapis Pondasi Agregat M3 308,974
1 1 7 01 01 01 331 Kerosene Ltr 1,186
1 1 7 01 01 01 332 Agregat Kelas C (M28) M3 300,163
1 1 7 01 01 01 333 Filler Ltr 1,949
1 1 7 01 01 01 334 Base C sampai di lokasi M3 221,119
1 1 7 01 01 01 335 Alat bantu ( set @ 3 alat ) set 105,222
1 1 7 01 01 01 336 Batu sungai pecah tersaring M3 966,232
1 1 7 01 01 01 337 Sirtu M3 482,735

1 1 7 01 01 02 BAHAN KIMIA
KIMIA PADAT
1 1 7 01 01 02 001 Silika Gel Gel Pack 150,000
1 1 7 01 01 02 002 KCL Padat Padat Unit 1,060,900
1 1 7 01 01 02 003 K2Cr2O7 Volume 500 gr Unit 2,903,000
1 1 7 01 01 02 004 (AR)HgSO4 Volume 50 gr Unit 2,192,400
1 1 7 01 01 02 005 1.10 Phenanthrolin Monohidrat Volume 10 gr Unit 1,896,300
1 1 7 01 01 02 006 Kalium hidrogen phtalate Volume 100 gr Unit 1,891,250
1 1 7 01 01 02 007 (Potassium Dihydr. Phosph Anhyd Supra) KH2PO4 Volume 500 gr Unit 817,000
KIMIA CAIR
1 1 7 01 01 02 008 Standard Solution for AAS K 1000 ppm Volume 500 ml Unit 1,390,000

1 1 7 01 01 02 009 Standard Solution for AAS Na 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 010 Standard Solution for AAS Co 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 011 Standard Solution for AAS Cr 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 012 Standard Solution for AAS Fe 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 013 Standard Solution for AAS Mn 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 014 Standard Solution for AAS Ni 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 015 Standard Solution for AAS Cu 1000 ppm Volume 500 ml Unit 1,390,000
1 1 7 01 01 02 016 Asam Nitrat, HNO, Merk RCL Labscan RP 1137C Unit 1,340,000
1 1 7 01 01 02 017 Dikalium Hidrogen Afosfat (K2HPO4) Merk Merck Unit 4,293,000

1 1 7 01 01 08 BAHAN/BIBIT TANAMAN PERTANIAN


PERTANIAN
1 1 7 01 01 08 001 Padi Unggul Lebel Putih 5 Kg Bks 100,000
1 1 7 01 01 08 002 Padi Ungggul Lebel Ungu 5 Kg Bks 80,000
1 1 7 01 01 08 003 Padi Unggul Lebel Biru 5 Kg Bks 70,000
1 1 7 01 01 08 004 Padi Gogo ( Non Hibrida ) 1 Kg Bks 106,308
1 1 7 01 01 08 005 Jagung Bisi 2 (Hibrida) 1 Kg Bks 194,403
1 1 7 01 01 08 006 Jagung Pioner (Hibrida) 1 Kg Bks 64,500
1 1 7 01 01 08 007 Jagung Lokal 250 Gr Bks 323,790
1 1 7 01 01 08 008 Jagung Manis Bonanza F-1 250 Gr Bks 130,000
1 1 7 01 01 08 009 Jagung Manis Secada 1 Kg Bks 125,000
1 1 7 01 01 08 010 Kacang Kedelai Lebel Putih 1 Kg Bks 49,020
1 1 7 01 01 08 011 Kacang Kedelai Lebel Ungu 1 Kg Bks 44,118
1 1 7 01 01 08 012 Kacang Kedelai Lebel Biru 1 Kg Bks 39,990
1 1 7 01 01 08 013 Kacang Kedelai Lokal 1 Kg Bks 36,378
1 1 7 01 01 08 014 Kacang Tanah Lokal 1 Stek Pucuk Batang 67,467
1 1 7 01 01 08 015 Stek Pucuk Ubi Jalar 1 stek Batang Batang 1,419
1 1 7 01 01 08 016 Stek Ubi Kayu lokal 1 stek batang Batang 2,580
1 1 7 01 01 08 017 Stek ubi Kayu (okulasi) 25 cm polybag Batang 4,515
TANAMAN BUAH
1 1 7 01 01 08 018 Bibit Jeruk Nipis 25-30 cm polybag Batang 15,000

ASSET LANCAR 1.1 Page 62 of 207


1 1 7 01 01 08 019 Bibit Jeruk Purut 25-30 cm polybag Batang 20,000
1 1 7 01 01 08 020 Bibit Jeruk Keprok Sipirok 30-35 cm polybag Batang 25,000
1 1 7 01 01 08 021 Jeruk Okulasi Benih sebar polybag Batang 54,438
1 1 7 01 01 08 022 Pepaya Benih Bungkus 25,000
1 1 7 01 01 08 023 Salak Bonggol 40 cm polybag Batang 20,000
1 1 7 01 01 08 024 Salak Seedling 40 cm polybag Batang 8,000
1 1 7 01 01 08 025 Duku Okulasi 40 cm polybag Batang 30,000
1 1 7 01 01 08 026 Duku Seedling 40 cm bonggol Batang 34,830
1 1 7 01 01 08 027 Pisang Anakan 20 cm plant Batang 8,127
1 1 7 01 01 08 028 Pisang Kultur Jaringan 30 cm polybag Batang 28,380
1 1 7 01 01 08 029 Alpukat Seedling 50 cm polybag Batang 16,254
1 1 7 01 01 08 030 Sawo / Cangkok 30 cm polybag Batang 44,634
1 1 7 01 01 08 031 Mangga okulasi/sambung 25 cm polybag Batang 36,507
1 1 7 01 01 08 032 Durian Okulasi 50 cm polybag Batang 44,634
1 1 7 01 01 08 033 Rambutan Okulasi 25 cm polybag Batang 44,634
1 1 7 01 01 08 034 Manggis / Sambung 30 cm polybag Batang 51,084
1 1 7 01 01 08 035 Manggis Seedling 30 cm Polybag Batang 30,000
1 1 7 01 01 08 036 Melinjo Sambung Tunas Pucuk Batang 34,830
1 1 7 01 01 08 037 Nenas 10 gram Bungkus 3,225
1 1 7 01 01 08 038 Bibit Markisa 10 gram Bungkus 34,701
SAYUR-SAYURAN
1 1 7 01 01 08 038 Cabe Laris 10 gr varietas unggul Bungkus 65,145
1 1 7 01 01 08 039 Cabe Taro 10 gr varietas unggul Bungkus 71,208
1 1 7 01 01 08 040 Selada 5 gr varietas unggul Bungkus 20,000
1 1 7 01 01 08 041 Tomat Permata F-1 5 gr varietas unggul Bungkus 71,208
1 1 7 01 01 08 042 Tomat Monica F-1 5 gr varietas unggul Bungkus 71,208
1 1 7 01 01 08 043 Timun Manggala Hercules 10 gr varietas unggul Bungkus 27,000
1 1 7 01 01 08 044 Cabe Rawit 10 gr varietas unggul Bungkus 65,145
1 1 7 01 01 08 045 Bayam 10 gr varietas unggul Bungkus 10,000
1 1 7 01 01 08 046 Buncis Lebat 500 gr varietas unggul Bungkus 145,512
1 1 7 01 01 08 047 Kangkung Bisi 1 kg varietas unggul Bungkus 35,000
1 1 7 01 01 08 048 Kangkung 1 Kg varietas unggul Bungkus 30,000
1 1 7 01 01 08 049 Sawi Manis 10 gr varietas unggul Bungkus 16,000
1 1 7 01 01 08 050 Sawi Pahit Majapahit Bintang Asia 25 gr varietas unggul Bungkus 20,000
1 1 7 01 01 08 051 Terong 1000 butir varietas unggul Bungkus 25,000
1 1 7 01 01 08 052 Kacang Panjang 1000 gr varietas unggul Bungkus 150,000
1 1 7 01 01 08 053 Palem ekor tupai 2,5 Meter Batang 387,000
1 1 7 01 01 08 054 Palem raja 2 Meter Batang 88,880
1 1 7 01 01 08 055 Palem waregu 1 Meter Batang 96,750
1 1 7 01 01 08 056 Palem kuning 1 Meter Pohon 109,650
1 1 7 01 01 08 057 Palem putri 2 Meter Pohon 193,500
1 1 7 01 01 08 058 Palem merah 1,5 Meter Pohon 483,750
1 1 7 01 01 08 059 Pohon kupu-kupu ungu 2 meter Pohon 154,800
1 1 7 01 01 08 060 Pohon dadap merah 2 Meter Pohon 116,100
1 1 7 01 01 08 061 Pohon mahoni 2,5 Meter Pohon 258,000
1 1 7 01 01 08 062 Ketapang Kencana 1,5 Meter 335,400
1 1 7 01 01 08 063 Bambu jepang 2,5 Meter Rumpun 84,624
1 1 7 01 01 08 064 Bambu panda / bali 2,5 Meter Rumpun 84,624
1 1 7 01 01 08 065 Bambu Kelisik 2 meter Rumpun 32,250
1 1 7 01 01 08 066 Bambu ampel 2 Meter Rumpun 67,725
1 1 7 01 01 08 067 Bambu cina 2, 5 Meter Rumpun 84,624
1 1 7 01 01 08 068 Bambu kuning 2 Meter Rumpun 59,211
1 1 7 01 01 08 069 Bibit Jahe Merah Kualitas Baik Rimpang 3,225
1 1 7 01 01 08 070 Bibit Jahe Putih Kualitas Baik Rimpang 3,225
1 1 7 01 01 08 071 Bibit Lengkuas Kualitas Baik Rimpang 2,838
1 1 7 01 01 08 072 Bibit Kencur Kualitas Baik Rimpang 2,838

ASSET LANCAR 1.1 Page 63 of 207


1 1 7 01 01 08 073 Bibit Kunyit Kualitas Baik Rimpang 2,838
1 1 7 01 01 08 074 Bibit Kumis Kucing Kualitas Baik Polibag 26,703
1 1 7 01 01 08 075 Bibit Temulawak Kualitas Baik Rimpang 3,999
1 1 7 01 01 08 076 Bibit Sirih Kualitas Baik Polibag 34,056
1 1 7 01 01 08 077 Entris karet klon Unggul 15 s/d 20 mata Batang 14,000
1 1 7 01 01 08 078 Kelatak Karet Sei Putih Butir 350
1 1 7 01 01 08 079 Kecambah Karet Pb 260 Butir 600
1 1 7 01 01 08 080 Bibit Karet Pb 260,Stum Mata Tidur Batang 7,000
1 1 7 01 01 08 081 Bibit Karet Pb 260, Payung dua Batang 15,000
1 1 7 01 01 08 082 Bibit Kulit Manis Kualitas Baik Polybag 14,000
1 1 7 01 01 08 083 Bibit Kelapa sawit Rispa Kecambah (DXP), (DyxP) Butir 13,000
1 1 7 01 01 08 084 Bibit Kelapa sawit Rispa PN (DxP), (DyxP) Polibag 32,000
1 1 7 01 01 08 085 Bibit Kelapa sawit Rispa Mni, 4 bln (DXP), (DyxP) Polibag 54,000
1 1 7 01 01 08 086 Bibit Kopi Arabica Umur 6 Bulan Polibag 6,500
1 1 7 01 01 08 087 Bibit Kopi Arabica Biji (bersertifikat) kg 300,000
1 1 7 01 01 08 088 Bibit Kopi Robusta Umur 6 Bulan Polibag 6,500
1 1 7 01 01 08 089 Bibit Kakao Kecambah Batang 1,500
1 1 7 01 01 08 090 Bibit Kakao Umur 5 bulan Polibag 7,500
1 1 7 01 01 08 091 Bibit Lada Stek Stek 7,000
1 1 7 01 01 08 092 Bibit Lada Stek 4 Bulan Polibag 10,000
1 1 7 01 01 08 093 Benih Cengkeh Kecambah Biji 2,500
1 1 7 01 01 08 094 Bibit Cengkeh Bibit 6 – 8 bulan Polibag 14,000
1 1 7 01 01 08 095 Bibit Pinang Biji Biji 2,700
1 1 7 01 01 08 096 Bibit Pinang Bibit 6 Bulan Polibag 8,000
1 1 7 01 01 08 097 Bibit Aren Umur 6 -12 bulan Polibag 15,000
1 1 7 01 01 08 098 Bibit Kelapa Dalam Umur 6 Bulan Polibag 27,500
1 1 7 01 01 08 099 Bibit Akasia Kualitas Baik Polibag 5,000
1 1 7 01 01 08 100 Bibit Dammar Kualitas Baik Polibag 13,500
1 1 7 01 01 08 101 Bibit Kemiri Kualitas Baik Polibag 5,600
1 1 7 01 01 08 102 Bibit Pulai Kualitas Baik Polibag 12,770
1 1 7 01 01 08 103 Bibit Jambu Monyet Kualitas Baik Polibag 11,350
1 1 7 01 01 08 104 Bibit Jabon Kualitas Baik Polibag 12,770
1 1 7 01 01 08 105 Bibit Kaliandra Merah Kualitas Baik Polibag 6,385
1 1 7 01 01 08 106 Bibit Kaliandra Putih Kualitas Baik Polibag 6,385
1 1 7 01 01 08 107 Bibit Anjangsana Kualitas Baik Polibag 9,935
1 1 7 01 01 08 108 Bibit Eukaliptus Kualitas Baik Polibag 6,385
1 1 7 01 01 08 109 Bibit Lamtoro Kualitas Baik Polibag 6,385
1 1 7 01 01 08 110 Bibit Sawo Kecik Kualitas Baik Polibag 13,480
1 1 7 01 01 08 111 Bibit Mindi Kualitas Baik Polibag 6,385
1 1 7 01 01 08 112 Bibit sengon Kualitas Baik Polibag 6,385
1 1 7 01 01 08 113 Bibit Cendana Kualitas Baik Polibag 14,190
1 1 7 01 01 08 114 Bibit Johar Kualitas Baik Polibag 9,675
1 1 7 01 01 08 115 Bibit Turi Kualitas Baik Polibag 9,675
1 1 7 01 01 08 116 Bibit Suren/ Ingul Kualitas Baik Polibag 6,385
1 1 7 01 01 08 117 Bibit Sungkai Kualitas Baik Polibag 12,850
1 1 7 01 01 08 118 Bibit Durian Kualitas Baik Polibag 6,385
1 1 7 01 01 08 119 Bibit Merbau Kualitas Baik Polibag 10,250
1 1 7 01 01 08 120 Bibit Petai Kualitas Baik Polibag 6,385
1 1 7 01 01 08 121 Bibit Manggis Kualitas Baik Polibag 14,190
1 1 7 01 01 08 122 Bibit Tembesu Kualitas Baik Polibag 14,190
1 1 7 01 01 08 123 Bibit Bambu Kualitas Baik Polibag 12,500
1 1 7 01 01 08 124 Bibit Mahoni Dalam Polybag Polibag 6,385
1 1 7 01 01 08 125 Bibit Jati Putih 3 - 4 Bln Polibag 6,385
1 1 7 01 01 08 126 Bibit Jati Emas/Super 1 - 4 Bln Polibag 14,190
1 1 7 01 01 08 127 Bibit Pinus Merkusi Dalam Polybag Polibag 9,675
1 1 7 01 01 08 128 Bibit Murbey Dalam Polybag Polibag 4,500

ASSET LANCAR 1.1 Page 64 of 207


1 1 7 01 01 08 129 Rotan Dalam Polybag Polibag 12,750
1 1 7 01 01 08 130 Trembesi Dalam Polybag Polibag 8,900
1 1 7 01 01 08 131 Gaharu Dalam Polybag Polibag 17,100
1 1 7 01 01 08 132 Meranti Dalam Polybag Polibag 6,385
1 1 7 01 01 08 133 Cemara Laut Dalam Polybag Polibag 8,100
1 1 7 01 01 08 134 Asam Gelugur Dalam Polybag Polibag 12,500
1 1 7 01 01 08 135 Bibit Aren Dalam Polybag Polibeg 20,140
1 1 7 01 01 08 136 Bibit Karet Seedling Umur 6-9 bulan, tinggi min. 30-75 cm Polibag 6,385

1 1 7 01 01 11 BAHAN/BIBIT TERNAK/BIBIT IKAN


TERNAK
1 1 7 01 01 11 001 Sapi Jantan Lokal Umur 1,5 - 2 th Ekor 9,000,000
1 1 7 01 01 11 002 Sapi Betina Ras Lokal, Berat Badan 75-100 Kg , Ekor 8,200,000
Umur 1,5 - 2 Th
1 1 7 01 01 11 003 Sapi induk super Ras Non Lokal, 2 - 3 Tahun Ekor 12,500,000
1 1 7 01 01 11 004 Sapi Jantan Ras PO, Umur 1,5 - 2 th Ekor 10,000,000
1 1 7 01 01 11 005 Kerbau Jantan Ras Lokal, Berat Badan 100-150 Kg, Ekor 18,000,000
Umur 2,5 - 3 th
1 1 7 01 01 11 006 Kerbau Betina Ras Lokal, Berat Badan 100-150 Kg, Ekor 16,500,000
Umur 1,5 - 2 Th
1 1 7 01 01 11 007 Kuda Jantan Ras Lokal, Umur 2 - 2,5 th Ekor 19,177,300
1 1 7 01 01 11 008 Kuda Betina Ras Lokal, Umur 1,5 - 2 th Ekor 15,067,900
1 1 7 01 01 11 009 Kambing Jantan Ras Lokal, Berat Badan 18-20 Kg, Ekor 2,514,000
Umur 1 - 1,5 Th
1 1 7 01 01 11 010 Kambing Betina Ras Lokal, Berat Badan 18-20 kg, Ekor 1,885,500
Umur 1 - 1,5 Th
1 1 7 01 01 11 011 Kambing Jantan PE Ras PE Berat Badan 20-22 kg Umur Ekor 7,542,000
1,5-2 Thn
1 1 7 01 01 11 012 Kambing Betina PE Ras PE Berat Badan 18-20 kg Umur Ekor 4,650,900
1,0-1,5 Thn
1 1 7 01 01 11 013 Domba Jantan Ras Lokal, Berat Badan 20 - 22 Kg, Ekor 2,199,750
Umur 1,5 - 2 Th
1 1 7 01 01 11 014 Domba Betina Ras Lokal, Berat Badan 18-20 Kg, Ekor 1,634,100
Umur 1 - 1,5 Th
1 1 7 01 01 11 015 Ayam Jantan Ras Lokal ; Umur 6 - 7 Bulan Ekor 156,600
1 1 7 01 01 11 016 Ayam Betina Ras Lokal; Umur 5 - 6 Bulan Ekor 102,700
1 1 7 01 01 11 017 Itik Jantan Ras Lokal Umur 4 - 5 Bulan Ekor 67,900
1 1 7 01 01 11 018 Itik Jantan Ras Lokal Umur 5 - 6 Bulan Ekor 73,100
1 1 7 01 01 11 019 Itik Betina Ras Lokal; Umur 4 - 5 Bulan (Dara) Ekor 78,300
1 1 7 01 01 11 020 Itik Betina Ras Lokal; Umur 5 - 6 Bulan (Dara) Ekor 83,500
1 1 7 01 01 11 021 DOC Ayam Ras Pedaging Umur 1 - 2 hari Ekor 8,900
1 1 7 01 01 11 022 DOC Ayam Buras Umur 1 - 2 hari Ekor 8,800
1 1 7 01 01 11 023 DOD Itik Lokal Jantan Umur 1 - 2 hari Ekor 7,500
1 1 7 01 01 11 024 DOD Itik Lokal Betina Umur 1 - 2 hari Ekor 9,000
IKAN
1 1 7 01 01 11 025 Ikan Mas Uk, 10-12 Cm Ekor 4,375
1 1 7 01 01 11 026 Ikan Mas Uk, 8-10 Cm Ekor 3,125
1 1 7 01 01 11 027 Ikan Mas Uk, 5-8 Cm Ekor 1,875
1 1 7 01 01 11 028 Ikan Mas Uk,3-5 Cm Ekor 1,250
1 1 7 01 01 11 029 Ikan Mas Uk, 1-3 Cm Ekor 625
1 1 7 01 01 11 030 Ikan Gurami Uk, 8-10 Cm Ekor 3,750
1 1 7 01 01 11 031 Ikan Gurami Uk, 5-8 Cm Ekor 3,125
1 1 7 01 01 11 032 Ikan Gurami Uk, 3-5 Cm Ekor 2,500
1 1 7 01 01 11 033 Ikan Patin Lokal Uk 5-8 Cm Ekor 1,875
1 1 7 01 01 11 034 Ikan Patin Lokal Uk 3-5 Cm Ekor 938
1 1 7 01 01 11 035 Ikan Bawal Tawar Lokal Uk 5-8 Cm Ekor 938

ASSET LANCAR 1.1 Page 65 of 207


1 1 7 01 01 11 036
Ikan Bawal Tawar Lokal Uk 3-5 Cm Ekor 2,500
1 1 7 01 01 11 037
Ikan Grass Crap Lokal Uk 5-8 Cm Ekor 1,875
1 1 7 01 01 11 038
Ikan Grass Crap Lokal Uk 3-5 Cm Ekor 1,250
1 1 7 01 01 11 039
Ikan Tawes Lokal Uk 8-10 Cm Ekor 1,875
1 1 7 01 01 11 040
Ikan Tawes Lokal Uk 5-8 Cm Ekor 938
1 1 7 01 01 11 041
Ikan Tawes Lokal Uk 3-5 Cm Ekor 625
1 1 7 01 01 11 042
Ikan Nila Nirwana Uk 8-10 Cm Ekor 1,875
1 1 7 01 01 11 043
Ikan Nila Nirwana Uk 5-8 Cm Ekor 1,250
1 1 7 01 01 11 044
Ikan Nila Nirwana Uk 3-5 Cm Ekor 625
1 1 7 01 01 11 045
Ikan Nila Gift Uk 8-10 Cm Ekor 1,250
1 1 7 01 01 11 046
Ikan Nila Gift Uk 5-8 Cm Ekor 1,000
1 1 7 01 01 11 047
Ikan Nila Gift Uk 3-5 Cm Ekor 625
1 1 7 01 01 11 048
Ikan Lele Uk. 10-12 Cm Ekor 1,250
1 1 7 01 01 11 049
Ikan Lele Uk. 5-8 Cm Ekor 625
1 1 7 01 01 11 050
Ikan Lele Uk. 3-5 Cm Ekor 438
1 1 7 01 01 11 051
Ikan Lele Uk. 1-3 Cm Ekor 250
1 1 7 01 01 11 052
Benih Udang Benur PL 10 Ekor 6,250
1 1 7 01 01 11 053
Benih Udang Lobstur Ukuran 1,5 - 2 inchi Ekor 6,837
1 1 7 01 01 11 054
Benih Kepiting Bakau Kelas C Ekor 5,483
1 1 7 01 01 11 055
Benih Kepiting Bakau Kelas A Ekor 13,674
INDUKAN IKAN
1 1 7 01 01 11 056 Ikan Mas Induk Betina 1,5 Kg Ekor 312,500
1 1 7 01 01 11 057 Ikan Mas Induk Jantan 1 Kg Ekor 107,100
1 1 7 01 01 11 058 Ikan Mas Betina 8 ekor @ 800-1.000gram/ekor & Paket 2,270,000
jantan 16 ekor @400-500 gram/ekor
1 1 7 01 01 11 059 Ikan Lele Induk Betina 1 Kg Ekor 107,800
1 1 7 01 01 11 060 Ikan Lele Induk Jantan 1 Kg Ekor 90,800
1 1 7 01 01 11 061 Ikan Lele Betina 10 ekor @ 800-1.000gram/ekor Paket 1,815,900
& jantan 5 ekor @800-1.000 gram/ekor

1 1 7 01 01 11 062 Ikan Nila Betina 300 ekor @ 200-300gram/ekor & Paket 7,944,800
jantan 100 ekor @200-300 gram/ekor

1 1 7 01 01 11 063 Ikan Gurami Betina 2 ekor @ 800-1.000gram/ekor & Paket 760,400


jantan 2 ekor @500-700 gram/ekor
1 1 7 01 01 11 064 Ikan Tawes Betina 200 ekor @ 200-300gram/ekor & Paket 6,242,300
jantan 100 ekor @200-300 gram/ekor

1 1 7 01 01 11 065 Ikan Patin Induk Betina 2 Kg Ekor 227,000


1 1 7 01 01 11 066 Ikan Patin Induk Jantan 1,5 Kg Ekor 187,200
1 1 7 01 01 11 067 Ikan Patin Betina 1 ekor @ 1.500-2.000gram/ekor Paket 851,200
& jantan 2 ekor @1.500-2.000
gram/ekor

GABAH
1 1 7 01 01 11 066 Gabah Kering Panen ( GKP ) Kadar Air 19-25 % Kg 7,740
1 1 7 01 01 11 067 Gabah Kering Simpan ( GKS ) Kadar Air 15-18 % Kg 8,385
1 1 7 01 01 11 068 Gabah Kering Giling ( GKG ) Kadar Air 14 % Kg 8,643
1 1 7 01 01 11 069 Gabah Kering Panen ( GKP ) Kadar Air 19-25 % Kg 7,482
1 1 7 01 01 11 070 Gabah Kering Simpan ( GKS ) Kadar Air 15-18 % Kg 8,385
1 1 7 01 01 11 071 Gabah Kering Giling ( GKG ) Kadar Air 14 % Kg 8,385

1 1 7 01 02 ` SUKU CADANG
1 1 7 01 02 01 SUKU CADANG ALAT ANGKUTAN
1 1 7 01 03 01 001 Balance Weight Toyota Camry Buah 13,800
1 1 7 01 03 01 002 Busi Toyota Camry Buah 270,900

ASSET LANCAR 1.1 Page 66 of 207


1 1 7 01 03 01 003 Filter Bensin Toyota Camry Buah 301,600
1 1 7 01 03 01 004 Filter Oli Toyota Camry Buah 67,700
1 1 7 01 03 01 005 Filter Udara Toyota Camry Buah 196,800
1 1 7 01 03 01 006 Minyak Rem Toyota Camry Buah 28,600
1 1 7 01 03 01 007 Packing Drain Toyota Camry Buah 4,300
1 1 7 01 03 01 008 Balance Weight Toyota Camry 3.5 Buah 13,800
1 1 7 01 03 01 009 Busi Toyota Camry 3.5 Buah 270,900
1 1 7 01 03 01 010 Filter Bensin Toyota Camry 3.5 Buah 301,700
1 1 7 01 03 01 011 Filter Oli Toyota Camry 3.5 Buah 67,600
1 1 7 01 03 01 012 Filter Udara Toyota Camry 3.5 Buah 215,800
1 1 7 01 03 01 013 Minyak Rem Toyota Camry RY 3.5 Buah 28,600
1 1 7 01 03 01 014 Packing Drain Toyota Camry 3.5 Buah 4,300
1 1 7 01 03 01 015 Balance Weight All New Corolla Altis A/T Buah 13,800
1 1 7 01 03 01 016 Busi All New Corolla Altis A/T Buah 13,200
1 1 7 01 03 01 017 Filter Bensin All New Corolla Altis A/T Buah 301,600
1 1 7 01 03 01 018 Filter Oli All New Corolla Altis A/T Buah 67,600
1 1 7 01 03 01 019 Filter Udara All New Corolla Altis A/T Buah 196,800
1 1 7 01 03 01 020 Minyak Rem All New Corolla Altis A/T Buah 28,600
1 1 7 01 03 01 021 Packing Drain All New Corolla Altis A/T Buah 4,300
1 1 7 01 03 01 022 Balance Weight All New Corolla Altis M/T Buah 13,800
1 1 7 01 03 01 023 Busi All New Corolla Altis M/T Buah 13,200
1 1 7 01 03 01 024 Filter Bensin All New Corolla Altis M/T Buah 301,700
1 1 7 01 03 01 025 Filter Oli All New Corolla Altis M/T Buah 67,600
1 1 7 01 03 01 026 Filter Udara All New Corolla Altis M/T Buah 196,800
1 1 7 01 03 01 027 Minyak Rem All New Corolla Altis M/T Buah 28,600
1 1 7 01 03 01 028 Packing Drain All New Corolla Altis M/T Buah 4,300
1 1 7 01 03 01 029 Balance Weight Toyota Vios Buah 13,800
1 1 7 01 03 01 030 Busi Toyota Vios Buah 11,600
1 1 7 01 03 01 031 Filter Bensin Toyota Vios Buah 301,700
1 1 7 01 03 01 032 Filter Oli Toyota Vios Buah 67,600
1 1 7 01 03 01 033 Filter Udara Toyota Vios Buah 136,500
1 1 7 01 03 01 034 Minyak Rem Toyota Vios Buah 28,600
1 1 7 01 03 01 035 Packing Drain Toyota Vios Buah 4,300
1 1 7 01 03 01 036 Balance Weight Toyota Innova Bensin A/T Buah 13,700
1 1 7 01 03 01 037 Busi Toyota Innova Bensin A/T Buah 11,600
1 1 7 01 03 01 038 Filter Bensin Toyota Innova Bensin A/T Buah 390,600
1 1 7 01 03 01 039 Filter Oli Toyota Innova Bensin A/T Buah 67,600
1 1 7 01 03 01 040 Filter Udara Toyota Innova Bensin A/T Buah 155,600
1 1 7 01 03 01 041 Packing Drain Toyota Innova Bensin A/T Buah 4,200
1 1 7 01 03 01 042 Balance Weight Toyota Innova Bensin M/T Buah 13,800
1 1 7 01 03 01 043 Busi Toyota Innova Bensin M/T Buah 11,600
1 1 7 01 03 01 044 Filter Bensin Toyota Innova Bensin M/T Buah 390,500
1 1 7 01 03 01 045 Filter Oli Toyota Innova Bensin M/T Buah 67,700
1 1 7 01 03 01 046 Filter Udara Toyota Innova Bensin M/T Buah 155,600
1 1 7 01 03 01 047 Packing Drain Toyota Innova Bensin M/T Buah 4,200
1 1 7 01 03 01 048 Balance Weight Toyota Hilux Buah 13,800
1 1 7 01 03 01 049 Busi Toyota Hilux Buah 13,200
1 1 7 01 03 01 050 Filter Bensin Toyota Hilux Buah 291,000
1 1 7 01 03 01 051 Filter Oli Toyota Hilux Buah 76,200
1 1 7 01 03 01 052 Filter Udara Toyota Hilux Buah 295,200
1 1 7 01 03 01 053 Minyak Rem Toyota Hilux Buah 28,600
1 1 7 01 03 01 054 Packing Drain Toyota Hilux Buah 4,200
1 1 7 01 03 01 055 Balance Weight Toyota Rush Buah 13,800
1 1 7 01 03 01 056 Busi Toyota Rush Buah 21,200
1 1 7 01 03 01 057 Filter Bensin Toyota Rush Buah 630,200
1 1 7 01 03 01 058 Filter Oli Toyota Rush Buah 30,600

ASSET LANCAR 1.1 Page 67 of 207


1 1 7 01 03 01 059 Filter Udara Toyota Rush Buah 111,200
1 1 7 01 03 01 060 Minyak Rem Toyota Rush Buah 28,600
1 1 7 01 03 01 061 Packing Drain Toyota Rush Buah 4,200
1 1 7 01 03 01 062 Filter Bensin Daihatsu Terios Buah 635,000
1 1 7 01 03 01 063 Filter Oli Daihatsu Terios Buah 30,600
1 1 7 01 03 01 064 Filter Udara Daihatsu Terios Buah 111,200
1 1 7 01 03 01 065 Kampas Rem Belakang Daihatsu Terios Buah 153,400
1 1 7 01 03 01 066 Kampas Rem Depan Daihatsu Terios Buah 354,600
1 1 7 01 03 01 067 Kopling Disc Daihatsu Terios Buah 418,000
1 1 7 01 03 01 068 Belt A/C Nissan Terano Buah 71,500
1 1 7 01 03 01 069 Belt Alternator Nissan Terano Buah 48,700
1 1 7 01 03 01 070 Belt Pwr Steering Nissan Terano Buah 107,400
1 1 7 01 03 01 071 Busi Satuan Nissan Terano Buah 15,800
1 1 7 01 03 01 072 Filter Bensin Nissan Terano Buah 212,800
1 1 7 01 03 01 073 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 65) Buah 1,149,300
205/65 VR15
1 1 7 01 03 01 074 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 60) Buah 1,348,300
215/60 VR16
1 1 7 01 03 01 075 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 60) Buah 1,449,900
225/60 VR16
1 1 7 01 03 01 076 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 50) Buah 1,283,700
225/50 VR16
1 1 7 01 03 01 077 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 50) Buah 1,219,200
205/50 VR16
1 1 7 01 03 01 078 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 50) Buah 1,141,900
195/50 VR16
1 1 7 01 03 01 079 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 50) Buah 1,034,000
195/50 VR15
1 1 7 01 03 01 080 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,399,000
225/55 VR17
1 1 7 01 03 01 081 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,322,900
215/55 VR17
1 1 7 01 03 01 082 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,244,500
225/55 VR16
1 1 7 01 03 01 083 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,219,200
215/55 VR16
1 1 7 01 03 01 084 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,213,900
205/55 VR16
1 1 7 01 03 01 085 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,193,700
195/55 VR16
1 1 7 01 03 01 086 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,162,000
195/55 VR15
1 1 7 01 03 01 087 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 55) Buah 1,116,500
185/55 VR15
1 1 7 01 03 01 088 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 65) Buah 1,097,500
195/65 VR15
1 1 7 01 03 01 089 Ban Kendaraan Roda 4 Bridgestone Turanza AR-10 (Seri 65) Buah 1,060,500
185/65 VR15
1 1 7 01 03 01 090 Ban Kendaraan Roda 4 Bridgestone Techno T-370 (Seri 70) Buah 512,200
175/70 SR12
1 1 7 01 03 01 091 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 50 & Buah 1,155,600
SERI 55) 195/50 VR15
1 1 7 01 03 01 092 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 55) Buah 1,416,000
225/55 VR17
1 1 7 01 03 01 093 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 55) Buah 1,322,900
205/55 VR16

ASSET LANCAR 1.1 Page 68 of 207


1 1 7 01 03 01 094 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 60) Buah 1,290,000
205/60 VR15
1 1 7 01 03 01 095 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 60) Buah 1,225,500
195/60 VR15
1 1 7 01 03 01 096 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 60) Buah 1,071,000
195/60 VR14
1 1 7 01 03 01 097 Ban Kendaraan Roda 4 Bridgestone Potenza G-III (Seri 60) Buah 1,009,600
185/60 VR 14
1 1 7 01 03 01 098 Ban Kendaraan Roda 4 Dunlop, SP 2000 (VR RANGE 55) Buah 1,102,700
205/55 VR16
1 1 7 01 03 01 099 Ban Kendaraan Roda 4 Dunlop, DIGNOS (VR RANGE 60) Buah 915,200
195/60 VR14
1 1 7 01 03 01 100 Ban Kendaraan Roda 4 Dunlop, D80V4 (HR RANGE 65) 205/65 Buah 1,038,200
HR15
1 1 7 01 03 01 101 Ban Kendaraan Roda 4 Dunlop, SP LM703 (HR RANGE 60) Buah 971,600
205/60 HR15
1 1 7 01 03 01 102 Ban Kendaraan Roda 4 Dunlop, SP LM703 (HR RANGE 60) Buah 927,100
205/60 HR15
1 1 7 01 03 01 103 Ban Kendaraan Roda 4 Dunlop, SP LM703 (HR RANGE 60) Buah 826,500
205/60 HR14
1 1 7 01 03 01 104 Ban Kendaraan Roda 4 Dunlop, SP LM703 (HR RANGE 60) Buah 929,200
195/60 HR15
1 1 7 01 03 01 105 Ban Kendaraan Roda 4 Dunlop, SP LM703 (HR RANGE 60) Buah 865,700
195/60 HR14
1 1 7 01 03 01 106 Ban Kendaraan Roda 4 Dunlop, SP LM703 (HR RANGE 60) Buah 820,100
185/60 HR14
1 1 7 01 03 01 107 Ban Kendaraan Roda 4 Dunlop, SP 2000 (VR RANGE 55) Buah 1,213,900
215/55 VR16
1 1 7 01 03 01 108 Ban Kendaraan Roda 4 Dunlop, SP 2000 (VR RANGE 55) Buah 1,334,500
225/55 VR16
1 1 7 01 03 01 109 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 45) 225/45 Buah 1,948,300
WR18
1 1 7 01 03 01 110 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 45) 215/45 Buah 1,259,400
WR17
1 1 7 01 03 01 111 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 50) 215/50 Buah 1,348,300
WR 17
1 1 7 01 03 01 112 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 50) 205/50 Buah 1,166,300
VR16
1 1 7 01 03 01 113 Ban Kendaraan Roda 4 Dunlop,FM901 (VR RANGE 50) 195/50 Buah 1,166,300
VR16
1 1 7 01 03 01 114 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 50) 195/50 Buah 989,500
VR15
1 1 7 01 03 01 115 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 55) 205/55 Buah 1,163,000
VR16
1 1 7 01 03 01 116 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 60) 205/60 Buah 988,400
VR15
1 1 7 01 03 01 117 Ban Kendaraan Roda 4 Dunlop, FM901 (VR RANGE 60) 195/60 Buah 984,100
VR15
1 1 7 01 03 01 118 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO GTR 378 Buah 792,700
235/70 R15
1 1 7 01 03 01 119 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO GTR 378 Buah 621,200
205/70 R14
1 1 7 01 03 01 120 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO BTX 65 Buah 520,700
185/65 R14
1 1 7 01 03 01 121 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO BTX 65 Buah 569,400
195/65 R14

ASSET LANCAR 1.1 Page 69 of 207


1 1 7 01 03 01 122 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO BTX 65 Buah 637,100
195/65 R15
1 1 7 01 03 01 123 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO BTX 65 Buah 661,400
205/65 R15
1 1 7 01 03 01 124 Ban Kendaraan Roda 4 GT RADIAL, CHAMPIRO BTX 65 Buah 710,100
215/65 R15
1 1 7 01 03 01 125 Ban Kendaraan Roda 4 GT RADIAL, Champiro BTX 65 215/65 Buah 750,300
R16
1 1 7 01 03 01 126 Ban Kendaraan Roda 4 GT RADIAL, Champiro GTR 378 175/70 Buah 397,900
R12
1 1 7 01 03 01 127 Ban Kendaraan Roda 4 GT RADIAL, Champiro GTR 378 155/70 Buah 350,400
R13
1 1 7 01 03 01 128 Ban Kendaraan Roda 4 GT RADIAL, Champiro GTR 378 175/70 Buah 423,300
R13
1 1 7 01 03 01 129 Ban Kendaraan Roda 4 GT RADIAL, Champiro GTR 378 185/70 Buah 475,200
R13
1 1 7 01 03 01 130 Ban Kendaraan Roda 4 GT RADIAL, Champiro GTR 378 185/70 Buah 503,800
R14
1 1 7 01 03 01 131 Ban Kendaraan Roda 4 GT RADIAL, Champiro GTR 378 195/70 Buah 607,500
R14
1 1 7 01 03 01 132 Ban Kendaraan Roda 4 GT RADIAL, Classiro 75 205/75 R15 Buah 785,200
1 1 7 01 03 01 133 Ban Kendaraan Roda 4 GT Radial, Champiro BAX 60 205/60 Buah 686,900
R15
1 1 7 01 03 01 134 Ban Kendaraan Roda 4 GT Radial, Champiro HPX 35 215/35 Buah 779,600
ZR18
1 1 7 01 03 01 135 Harga Oli. AGIP Extra HTS5-40 Ltr 38,100
1 1 7 01 03 01 136 Harga Oli. AGIP Formula 2000 Extra 10W-40 Ltr 64,500
SJ/CF
1 1 7 01 03 01 137 Harga Oli. AGIP Sint 2000 10W-40 SJ/CF Ltr 84,200
1 1 7 01 03 01 138 Harga Oli. CASTROL Edge 5W-40 Ltr 135,500
1 1 7 01 03 01 139 Harga Oli. CASTROL Magnatec 10W-40 Ltr 54,500
1 1 7 01 03 01 140 Harga Oli. CASTROL New GTX 20W-50 SL/CF Ltr 38,600
1 1 7 01 03 01 141 Harga Oli. Indomobil Oil HP 20W-50 Ltr 42,200
1 1 7 01 03 01 142 Harga Oli. Indomobil Oil Supersyn 20W-50 SG Ltr 38,100
1 1 7 01 03 01 143 Harga Oli. Indomobil Oil Supreme 10W-40 SL Ltr 49,700
1 1 7 01 03 01 144 Harga Oli. Pertamina Fastron 10W-40 SL (1L) Ltr 55,000
1 1 7 01 03 01 145 Harga Oli. Pertamina Fastron 20W-50 SL (1L) Ltr 48,200
1 1 7 01 03 01 146 Harga Oli. Pertamina Mesran prima 20W-50 Ltr 34,900
1 1 7 01 03 01 147 Harga Oli. Pertamina Prima XP 10W-40 SL (1L) Ltr 42,300
1 1 7 01 03 01 148 Harga Oli. Pertamina Prima XP 20W-50 SJ (1L) Ltr 37,100
1 1 7 01 03 01 149 Harga Oli. STP Motor Oil 20W-50 Ltr 40,200
1 1 7 01 03 01 150 Harga Oli. STP Motor Oil SAE 20W-50 Ltr 40,200
1 1 7 01 03 01 151 Harga Oli. STP Syntetic Diesel 15W-40 Ltr 45,500
1 1 7 01 03 01 152 Harga Accu YUASA N 200 Buah 2,488,100
1 1 7 01 03 01 153 Velg 13 IRC Set 2,113,000
1 1 7 01 03 01 154 Velg 14 TECHNO Set 2,780,200
1 1 7 01 03 01 155 Velg 15 Bridge Stone Set 2,893,200
1 1 7 01 03 01 156 Busi Champion c 700 Buah 27,900
1 1 7 01 03 01 157 Busi ND Buah 29,900
1 1 7 01 03 01 158 Accu Kenderaan Roda Dua 12 Ampere Buah 189,500
1 1 7 01 03 01 159 Helm (Standard) SNI Buah 145,400
1 1 7 01 03 01 160 Paking Set GL Pro Set 160,700
1 1 7 01 03 01 161 Platina ND Buah 116,700
1 1 7 01 03 01 162 Rantai + Gigi Tarik c 700 Set 270,300
1 1 7 01 03 01 163 Ring Piston bc 700 10 v 0,75 Set 171,600
SUKU CADANG ALAT BERAT

ASSET LANCAR 1.1 Page 70 of 207


1 1 7 01 03 01 164 Air batreray krat 63,000
1 1 7 01 03 01 165 Air Cleaner Inner no.6190628 m1 Backhoe Loader BHL bh 63,000
820 Terex
1 1 7 01 03 01 166 Air Cleaner Outer no.619062761 Backhoe Loader BHL 820 bh 50,400
Terex
1 1 7 01 03 01 167 Angker Stater Wheel Loader Kobelco bh 1,512,000
1 1 7 01 03 01 168 Ban Dalam Belakang Uk. 18,4x26 Backhoe Loader BHL bh 378,000
820 Terex
1 1 7 01 03 01 171 Ban Dalam Uk. 1.100-20-16 Greder bh 378,000
1 1 7 01 03 01 172 Ban Dalam Uk. 1.000-20-16 bh 378,000
1 1 7 01 03 01 173 Ban Dalam Uk. 16-8-24 Wheel Loader bh 567,000
1 1 7 01 03 01 174 Ban Dalam Uk. 750-16-14 bh 315,000
1 1 7 01 03 01 175 Ban Dalam Uk. 700-16-14 bh 315,000
1 1 7 01 03 01 185 Batreray YUASA N 100/12 A bh 1,701,000
1 1 7 01 03 01 186 Batreray YUASA N 70/12 A bh 1,260,000

1 1 7 01 03 ALAT/BAHAN UNTUK KEGIATAN KANTOR


1 1 7 01 03 01 ALAT TULIS KANTOR
1 1 7 01 03 01 001 Ballpoint Cair Gel Cair, 0,5 mm Buah 5,200
1 1 7 01 03 01 002 Ballpoint Faster C600 Buah 3,300
1 1 7 01 03 01 003 Ballpoint Balliner Carinex Buah 5,200
1 1 7 01 03 01 004 Ballpoint Balliner Elite Standard Buah 12,500
1 1 7 01 03 01 005 Ballpoint Balliner Pilot Medium Buah 17,200
1 1 7 01 03 01 006 Pensil Merah Biru Ukuran Kecil Buah 3,000
1 1 7 01 03 01 007 Pensil Hitam Kualitas Bagus Buah 3,600
1 1 7 01 03 01 008 Pensil Hitam Biasa Buah 1,100
1 1 7 01 03 01 009 Gel Pen Batik Gel, 1,0 mm Buah 12,200
1 1 7 01 03 01 010 Stabilo Kualitas Bagus Buah 7,800
1 1 7 01 03 01 011 Spidol White Board Kualitas Bagus Buah 7,300
1 1 7 01 03 01 012 Spidol Merah Biru Kualitas Bagus Buah 4,900
1 1 7 01 03 01 013 Spidol Permanen Kualitas Bagus Buah 7,700
1 1 7 01 03 01 014 Buku Agenda Surat Keluar Masuk Uk. 33 x 21,5 cm Isi 100 Lbr Buah 19,000
1 1 7 01 03 01 015 Buku Agenda Deluxe Uk. HVS Polio Buah 145,200
1 1 7 01 03 01 016 Buku Kas Umum Folio Isi 200 Lembar Buah 44,100
1 1 7 01 03 01 017 Buku Kas Kwarto Kwarto Isi 100 Lembar Buah 19,800
1 1 7 01 03 01 018 Buku Kas Tabelaris Uk. 49 x 32 cm Isi 100 Lembar Buah 34,200
1 1 7 01 03 01 019 Buku Tulis Kwarto Uk. 28 x 21 cm Isi 100 Lbr Buah 11,900
1 1 7 01 03 01 020 Buku Kwitansi Berwarna Isi 100 Lembar Buah 6,800
1 1 7 01 03 01 021 Buku Ekspedisi Uk. 33 x 10,5 cmIsi 100 Lbr Buah 16,900
1 1 7 01 03 01 022 Blok Note ½ Folio Tak Bergaris Uk. 16,5 x 21 cm Isi 50 Buah 9,600
Lbr
1 1 7 01 03 01 023 Blok Note ½ Folio Uk. A5 Buah 20,400
1 1 7 01 03 01 024 Tinta Pulpen Botol 25 ml Botol 18,500
1 1 7 01 03 01 025 Tinta Ballpoint (Refil) Kualitas Bagus Buah 15,500
1 1 7 01 03 01 026 Tinta Stempel Botol 25 ml Botol 28,700
1 1 7 01 03 01 027 Tinta Printer Isi Ulang Hitam Kotak 40 ml Kotak 28,700
1 1 7 01 03 01 028 Tinta Printer Isi Ulang Warna Kotak 40 ml Kotak 47,900
1 1 7 01 03 01 029 Tinta Printer Isi Ulang Hitam Uk. 300 ml Botol 47,900
1 1 7 01 03 01 030 Tinta Printer Isi Ulang Warna Uk. 300 ml Botol 19,400
1 1 7 01 03 01 031 Tinta Printer isi ulang Hitam/warna Epson L Botol 100,000
1 1 7 01 03 01 032 Tinta Printer Serbuk/Toner buah 100,000
1 1 7 01 03 01 033 Pita Mesin Tik Kualitas Bagus Roll 19,400
1 1 7 01 03 01 034 Pita Printer Epson LQ-2170 Buah 72,700
1 1 7 01 03 01 035 Refill Pita Printer Epson LQ-2170 Buah 41,500
1 1 7 01 03 01 036 Pita Mesin Fax isi 2 Roll 129,700
1 1 7 01 03 01 037 Ban Isolasi Putih 2 inchi Uk. Besar Rol 13,600

ASSET LANCAR 1.1 Page 71 of 207


1 1 7 01 03 01 038 Ban Isolasi Putih 1 inchi Uk. Sedang Rol 11,400
1 1 7 01 03 01 039 Ban Isolasi Putih 1/2 inchi Uk. Kecil Rol 8,400
1 1 7 01 03 01 040 Ban Isolasi Hitam Uk. 2 inchi Uk. 2 inchi Rol 11,200
1 1 7 01 03 01 041 Ban Isolasi Hitam Uk. 1 inchi Uk. 1 inchi Rol 7,400
1 1 7 01 03 01 042 Trigonal Paper Clip/Penjepit surat Uk. Kecil Kotak 3,600
1 1 7 01 03 01 043 Trigonal Paper Clip/Penjepit surat Uk. Sedang Kotak 5,000
1 1 7 01 03 01 044 Trigonal Paper Clip/Penjepit surat Uk. Besar Kotak 8,300
1 1 7 01 03 01 045 Blinder Clip Atom No. 260 Buah 26,000
1 1 7 01 03 01 046 Blinder Clip Atom No. 200 Kotak 15,700
1 1 7 01 03 01 047 Blinder Clip Atom No. 155 Kotak 10,400
1 1 7 01 03 01 048 Blinder Clip Atom No. 105 Kotak 6,700
1 1 7 01 03 01 049 Lem Cair Fox Botol 9,600
1 1 7 01 03 01 050 Lem Cair Povinal Besar Botol 5,200
1 1 7 01 03 01 051 Lem Kertas Model Spidol Uk. kecil Buah 3,000
1 1 7 01 03 01 052 Lem Alteco Kualitas Biasa Buah 7,600
1 1 7 01 03 01 053 Penghapus Biasa DC-50 Pelikan Buah 1,100
1 1 7 01 03 01 054 Penghapus Pensil 2B Kualitas Bagus Buah 2,300
1 1 7 01 03 01 055 Penghapus White Board Kualitas Bagus Buah 6,100
1 1 7 01 03 01 056 Rautan Pensil Biasa Kualitas Bagus Buah 1,900
1 1 7 01 03 01 057 Pembuka Hekter Kualitas Biasa Buah 10,900
1 1 7 01 03 01 058 Hekter Uk. 3 Buah 30,400
1 1 7 01 03 01 059 Hekter Uk. 10 Buah 14,400
1 1 7 01 03 01 060 Anak Hekter Uk. 3 Kotak 4,100
1 1 7 01 03 01 061 Anak Hekter Uk. 10 Kotak 2,000
1 1 7 01 03 01 062 Stempel Angka Huruf Kecil Kualitas Biasa Buah 43,300
1 1 7 01 03 01 063 Stempel Angka Huruf Besar Kualitas Biasa Buah 95,000
1 1 7 01 03 01 064 Stempel Huruf Berputar Kualitas biasa Buah 40,300
1 1 7 01 03 01 065 Bantalan Stempel Uk. Besar Rol 9,600
1 1 7 01 03 01 066 Bantal Stempel Penghitung Uang Kualitas Bagus Buah 13,600
1 1 7 01 03 01 067 Mistar Kayu Uk. 30 cm Buah 5,300
1 1 7 01 03 01 068 Mistar Kayu Uk. 50 cm Buah 5,900
1 1 7 01 03 01 069 Mistar Plastik Uk. 30 cm Buah 1,100
1 1 7 01 03 01 070 Mistar Stainless Uk. 30 cm Buah 4,200
1 1 7 01 03 01 071 Kapur Tulis Biasa Kualitas Bagus Kotak 7,600
1 1 7 01 03 01 072 Kapur Tulis Warna Kualitas Bagus Kotak 11,400
1 1 7 01 03 01 073 Baterai Remote AC AA Set 4,900
1 1 7 01 03 01 074 Baterai Kotak Duracel 9 Volt A+ Buah 9,600
1 1 7 01 03 01 075 Baterai Kotak Duracel 9 Volt 9 Volt Buah 11,600
1 1 7 01 03 01 076 Baterai AAA (isi 2) AAA Set 14,400
1 1 7 01 03 01 077 Album Fhoto Uk 40 x 40 Isi 150 lbr Buah 74,800
1 1 7 01 03 01 078 Album Fhoto Uk 40 x 40 Isi 80 lbr Buah 54,900
1 1 7 01 03 01 079 Pelobang Kertas Uk. Kecil Buah 21,800
1 1 7 01 03 01 080 Paku Payung Square Dos 14,400
1 1 7 01 03 01 081 Box Arsip Kualitas Bagus Kotak 16,000
1 1 7 01 03 01 082 Tipp-Ex Kualitas Bagus Buah 6,800
1 1 7 01 03 01 083 Cutter Besar Kenko L-500 Buah 14,400
1 1 7 01 03 01 084 Gunting Sedang Kenko Buah 4,900
1 1 7 01 03 01 085 Keranjang Berkas/Surat Kualitas Bagus Buah 23,900
1 1 7 01 03 01 086 Tanda Pengenal (Bed Name) Kualitas Bagus Buah 25,000
1 1 7 01 03 01 087 Tas Ransel Diklat Kualitas Bagus Buah 100,000
1 1 7 01 03 01 092 Kalkulator 14 Digit unit 95,000
1 1 7 01 03 01 093 Kalkulator 16 Digit unit 120,000
1 1 7 01 03 01 094 kalkulator Saku standar unit 20,000
1 1 7 01 03 01 095 Kertas Cover folio Pak 20,000
1 1 7 01 03 01 096 Kertas Manila Kualitas Bagus lembar 2,000
1 1 7 01 03 01 097 Kertas Foto Kualitas Bagus pak 2,000

ASSET LANCAR 1.1 Page 72 of 207


1 1 7 01 03 01 098 Kertas HVS Warna 70 gr Rim 55,000
1 1 7 01 03 01 099 Tinta Serbuk Fotocopy Kualitas Bagus pak 130,000
1 1 7 01 03 01 100 Spidol OHP Pen Kualitas Bagus pak 120,000
1 1 7 01 03 01 101 Plastik Laminating Kualitas Bagus Pak 95,000
1 1 7 01 03 01 102 Correction Pen Kualitas Bagus buah 6,000
1 1 7 01 03 01 103 Buku Tulis Kualitas Bagus 58 lembar buah 6,000
1 1 7 01 03 01 104 Buku Nota 2 lapis, 25 lembar buah 5,000
1 1 7 01 03 01 105 Buku Kwitansi 80 lembar buah 7,000
1 1 7 01 03 01 106 Penggaris Gambar Segitiga Kualitas Bagus buah 15,000

1 1 7 01 03 02 KERTAS DAN COVER


1 1 7 01 03 02 086 Kertas HVS Folio 70 gram Uk. 33 x 21,5 cm Rim 40,200
1 1 7 01 03 02 087 Kertas HVS Kwarto 70 gram Uk. A4 Rim 40,200
1 1 7 01 03 02 088 Kertas HVS A3 70 Gram Uk. A3 Rim 58,100
1 1 7 01 03 02 089 Kertas HVS Folio Bergaris Uk. 33 x 21,5 cm Pak 19,400
1 1 7 01 03 02 090 Kertas Karbon Folio Isi 100 Lbr Pak 37,000
1 1 7 01 03 02 091 Kertas Buffalo Folio Kulit Jeruk Uk. 33 x 21,5 cm Bks/100 lbr 38,600
1 1 7 01 03 02 092 Kertas Faximile Uk. 210/216x30 Gulung 25,800
1 1 7 01 03 02 093 Kertas Faximile Kualitas Bagus Gulung 34,900
1 1 7 01 03 02 094 Map Ordner Folio 403 Kualitas Bagus Buah 19,400
1 1 7 01 03 02 095 Map Ordner Folio 401 Kualitas Bagus Buah 19,400
1 1 7 01 03 02 096 Map Plastik Folio Kualitas Bagus Buah 4,900
1 1 7 01 03 02 097 Map Plastik Bening Berkancing Kualitas Bagus Buah 3,100
1 1 7 01 03 02 098 Map Biasa (Stop Map) Folio Uk. 24 x 35.5 Buah 1,100
1 1 7 01 03 02 099 Map Snalhekter Uk. 24 x 35.5 Buah 2,200
1 1 7 01 03 02 100 Map Gantung Kualitas Bagus Buah 11,900
1 1 7 01 03 02 101 Map Batik Kualitas Bagus Buah 6,200
1 1 7 01 03 02 102 Amplop Putih Tebal Uk. 110 x 230 mm Ktk/100 Lbr 27,000
1 1 7 01 03 02 103 Amplop Putih Tebal Uk. 114 x 162 mm Ktk/100 Lbr 19,700
1 1 7 01 03 02 104 Amplop Coklat Tebal Uk. 29 x 39 cm Ktk/100 Lbr 76,600
1 1 7 01 03 02 105 Amplop Coklat Tebal Uk. 24 x 34 cm Ktk/100 Lbr 67,000
1 1 7 01 03 02 106 Tempat Surat (Trey Surat) Bentuk Talam Bahan Plastik Buah 19,000

1 1 7 01 03 03 BAHAN CETAK
1 1 7 01 03 03 001 Cetak Kartu Surat Keluar/Masuk Isi 50 Set/Blok Rangkap 5 ½ Folio Blok 53,800
NCR
1 1 7 01 03 03 002 Cetak Blanko Memo dll, Kertas HVS 60 Gram Isi 100 ½ Folio Blok 19,400
Lembar/Blok
1 1 7 01 03 03 003 Cetak Blanko Kwitansi dll Isi 250 Lembar/Blok Kertas ½ Folio Blok 46,400
Berwarna
1 1 7 01 03 03 004 Cetak Blanko Lembar Disposisi isi 50 set/blok rangkap 3 ½ Folio Blok 50,500
NCR
1 1 7 01 03 03 005 Cetak Kop Surat Pakai Lambang Daerah Berwarna Kertas Uk. Folio Rim 172,400
HVS 60 Gr
1 1 7 01 03 03 006 Cetak Kop Surat Pakai Lambang Daerah Air Mas Kertas Uk. Folio Rim 201,900
HVS 60 Gr
1 1 7 01 03 03 007 Cetak Blanko SPPD dll Isi 50 Set / Blok Rangkap 3 Timbal Uk. Folio Blok 119,300
Balik
1 1 7 01 03 03 008 Cetak Blanko Order Pembelian (OP) dll Isi 50 set/blok Uk. Folio Blok 91,000
rangkap 3 kertas berwarna
1 1 7 01 03 03 009 Cetak Blanko Bukti Pengeluaran Barang dll Isi 200 Uk. Folio Blok 69,200
Lembar/Blok.
1 1 7 01 03 03 010 Cetak Kartu Barang Model Bend 22, 23 Dari Kertas Manila. Uk. Folio Lembar 3,000

1 1 7 01 03 03 011 Cetak Blanko Barang Inventaris &Pakai Habis Model Bend Uk. Folio Blok 95,800
18 dan 19 Isi 50 Set/Blok rangkap 5

ASSET LANCAR 1.1 Page 73 of 207


1 1 7 01 03 03 012 Cetak Blanko Order Perbaikan Alat (OPAK) isi 50 Set/Blok Uk. Folio Blok 96,000
Rangkap 5 Kertas Berwarna.
1 1 7 01 03 03 013 Cetak Blanko Surat Permintaan Pembayaran Model Bend 1 Uk. Folio Blok 152,000
s/d 4 dll Isi 50 set/Blok rangkap 5 NCR.
1 1 7 01 03 03 014 Cetak Blanko Kartu Inventaris Barang (KIB), Kartu Uk. Folio Lembar 3,000
Inventaris Ruangan (KIR) Kertas Manila.
1 1 7 01 03 03 015 Cetak Kartu Pengendali dll Isi 100 Lembar/Blok. Uk. Folio Blok 35,300
1 1 7 01 03 03 016 Cetak Blanko Daftar Penerimaan /Pengeluaran Barang dll. Doble Folio Rim 252,300

1 1 7 01 03 03 017 Cetak Blanko Daftar Gaji Kertas HVS 60 gr Per Set (7 Double Folio Set 7,800
Lembar).
1 1 7 01 03 03 018 Cetak Kulit Sampul Laporan Daftar Mutasi Barang (DMB). Doble Folio Lembar 25,200

1 1 7 01 03 03 019 Cetak Amplop Dinas Pakai Lambang Daerah Hitam Putih Kecil Kotak 75,700
Kertas Cassing Kuning.
1 1 7 01 03 03 020 Cetak Amplop Dinas Pakai Lambang Daerah Hitam Putih Sedang Kotak 151,500
Kertas Cassing Kuning.
1 1 7 01 03 03 021 Cetak Amplop Dinas Pakai Lambang Daerah Hitam Putih Besar Kotak 201,900
Kertas Cassing Kuning.
1 1 7 01 03 03 022 Cetak Kartu Lebaran Pakai Lambang Daerah. Kertas Linen. Air Mas Lembar 8,000
1 1 7 01 03 03 023 Cetak Kartu Lebaran Pakai Lambang Daerah. Kertas Linen. Hitam Putih Lembar 4,000
1 1 7 01 03 03 024 Cetak Map Pakai Lambang Daerah. Kertas Linen. Air Mas Lembar 15,900
1 1 7 01 03 03 025 Cetak Map Pakai Lambang Daerah. Kertas Linen. Hitam Putih Lembar 11,900
1 1 7 01 03 03 026 Cetak Blangko Pemegang Hak Sewa (SPSM). Double Folio, Timbal balik, 3 Warna, 3 Set 6,000
Lembar/set.
1 1 7 01 03 03 027 Cetak Blanko Daftar Ulang SPSM. Folio, Timbal balik, 3 Warna, 3 Set 3,800
Lembar/set
1 1 7 01 03 03 028 Cetak Spanduk Frontlite m 30,000
1 1 7 01 03 03 029 Cetak Brosur/Leafleat berwarna rim 500,000
1 1 7 01 03 03 030 Surat Suara Pilkades HVS 21,5 x 33 cm Lembar 2,100
1 1 7 01 03 03 031 Perhitungan Surat Suara Pilkades Plano Lembar 7,000
1 1 7 01 03 03 032 Perhitungan Surat Suara Pilkades Plano Lembar 3,200
1 1 7 01 03 03 033 Segel Pilkades Kertas Stiker 4 x 6 cm Lembar 400
1 1 7 01 03 03 034 Kantong Surat Suara 30 x 40 x 12 cm Lembar 8,200
1 1 7 01 03 03 035 Sampul Berita Acara Kertas Kissing 28 x 35 cm Lembar 2,900
1 1 7 01 03 03 036 Fotocopy Uk. Folio Lembar 300
1 1 7 01 03 03 037 Fotocopy Double Folio Lembar 500
1 1 7 01 03 03 038 Cetak Sertifikat Kegiatan Uk. Folio Lembar 15,200
1 1 7 01 03 03 039 Cetak Modul / Buku / Bahan Ajar Diklat Kualitas Bagus Set 20,000
1 1 7 01 03 03 040 Cetak Peta A0 Lembar
1 1 7 01 03 03 041 Cetak Peta A1 Lembar
1 1 7 01 03 03 042 Cetak Peta A2 Lembar
1 1 7 01 03 03 043 Cetak Peta A3 Lembar

1 1 7 01 03 04 BENDA POS
1 1 7 01 03 04 001 Materai 6000 buah 6,000
1 1 7 01 03 04 002 Materai 3000 buah 3,000

1 1 7 01 03 06 BAHAN KOMPUTER
1 1 7 01 03 06 001 Flashdisk Sandisk Cruzer Fit CZ33 8GB Buah 41,000
1 1 7 01 03 06 002 Flashdisk Sandisk Cruzer Fit CZ33 16GB Buah 57,000
1 1 7 01 03 06 003 Flashdisk Sandisk Cruzer Fit CZ33 32GB Buah 107,900
1 1 7 01 03 06 004 Flashdisk Sandisk Cruzer Fit CZ33 64GB Buah 225,700
1 1 7 01 03 06 005 Flashdisk Sandisk Cruzer Ultra Fit CZ43 16GB Buah 71,400
USB 3.0

ASSET LANCAR 1.1 Page 74 of 207


1 1 7 01 03 06 006 Flashdisk Sandisk Cruzer Ultra Fit CZ43 32GB Buah 117,000
USB 3.0
1 1 7 01 03 06 007 Flashdisk Sandisk Cruzer Ultra Fit CZ43 64GB Buah 215,800
USB 3.0
1 1 7 01 03 06 008 Flashdisk 8GB Buah 93,000
1 1 7 01 03 06 009 Flashdisk 16GB Buah 112,500
1 1 7 01 03 06 010 Flashdisk 32GB Buah 195,300
1 1 7 01 03 06 011 Flashdisk Kingston 16GB USB 3.0 – OTG – Buah 97,300
DTDUO3 16GB
1 1 7 01 03 06 012 Flashdisk Kingston 32GB USB 3.0 – OTG – Buah 152,000
DTDUO3 32GB
1 1 7 01 03 06 013 Cartridge Printer Canon PG 830 Buah 250,000
1 1 7 01 03 06 014 Catridge Printer Canon PG 810 Buah 220,000
1 1 7 01 03 06 015 Catridge Printer Canon CL 811 Buah 254,200
1 1 7 01 03 06 016 Catridge Printer Canon CL 831 Buah 231,800
1 1 7 01 03 06 017 Catridge Printer Canon CLI 8 Buah 145,200
1 1 7 01 03 06 018 Catridge Printer Canon CLI 8 Black Buah 152,000
1 1 7 01 03 06 019 Catridge Printer HP 60 Colour Buah 189,200
1 1 7 01 03 06 020 Catridge Printer HP 22 Colour, Cartridge Original Buah 198,400
( Colour )
1 1 7 01 03 06 021 Catridge Printer HP 21 Black Buah 178,600
1 1 7 01 03 06 022 Catridge Printer HP 703 Black Buah 105,600
1 1 7 01 03 06 023 Catridge Printer HP 703 Colour Buah 105,600
1 1 7 01 03 06 024 Catridge Printer HP 802 Black Buah 86,300
1 1 7 01 03 06 025 Catridge Printer HP 702 Black Buah 291,800
1 1 7 01 03 06 026 Catridge Printer HP 704 Black Buah 105,600
1 1 7 01 03 06 027 Catridge Printer HP 704 Colour Buah 105,600
1 1 7 01 03 06 028 Catridge Printer HP 56 Black Buah 229,500
1 1 7 01 03 06 029 Catridge Printer HP 92 Black Buah 178,600
1 1 7 01 03 06 030 Catridge Printer HP 93 Colour Buah 228,000
1 1 7 01 03 06 031 Catridge Printer HP 98 Black Buah 196,100
1 1 7 01 03 06 032 Catridge Printer HP 95 Colour Buah 275,900
1 1 7 01 03 06 033 Catridge Printer HP 901 Black Buah 185,400
1 1 7 01 03 06 034 Catridge Printer HP Laserjet 12 Buah 767,600
1 1 7 01 03 06 035 Keyboard Logitech Classic Keyboard K100 [920- Unit 81,300
002145] Keyboard Cable PS/2
1 1 7 01 03 06 036 Keyboard Standart keyboard, PS/2. Unit 180,100
1 1 7 01 03 06 037 Keyboard Logitech Bundle Ultra Flat Kb USB + Unit 106,400
[M100 USB] Keyboard
CableUSBBundle Ultra Flat Kb USB +
M100 USB.

1 1 7 01 03 06 038 Keyboard Logitech Media Keyboard K200 [920- Unit 120,500


002688] Keyboard Cable US
1 1 7 01 03 06 039 Keyboard Comfortable keyboard, thin profile, Unit 155,600
USB.
1 1 7 01 03 06 040 Keyboard Logitech Classic Desktop USB MK100 Unit 137,400
[920-003649] Keyboard Cable USB
Keyboard and Mouse, USB.

1 1 7 01 03 06 041 Keyboard Logitech Media Combo MK200 [920- Unit 96,100


002693] Keyboard Cable USB High-
definition optical mouse, Instant access
to applications, USB port.

1 1 7 01 03 06 042 Keyboard Logitech Ultra Flat Keyboard [967582- Unit 939,800


0132] Keyboard Cable USB Black Ultra
Flat Keyboard, USB.

ASSET LANCAR 1.1 Page 75 of 207


1 1 7 01 03 06 043 Keyboard Genius Standard Desktop Keyboard Unit 139,800
[KB 110] + [NS-120] Keyboard Cable
PS/2 Spill Resistant Design Keyboard,
PS/2.

1 1 7 01 03 06 044 Keyboard Lexma Standard Keyboard Unit 155,000


[LK6800] Keyboard Cable PS/2 Soft
Button, PS/2.

1 1 7 01 03 06 045 Keyboard Microsoft Wired Keyboard 200 [2SJ- Unit 160,100


00003] - Black Keyboard Cable USB
1 1 7 01 03 06 046 Keyboard Ultra Slim Wireless Keyboard & Mouse Unit 190,000

1 1 7 01 03 06 047 Keyboard Logitech Wireless Keyboard Mouse Unit 250,000


Combo
1 1 7 01 03 06 048 Keyboard Standard Wired Keyboard. Unit 591,100
1 1 7 01 03 06 049 Mouse Logitech Optical Mouse B100 [910- Unit 62,900
01439] Mouse Cable USB 800 dpi,
Optical mouse, USB

1 1 7 01 03 06 050 Mouse Logitech Optical Mouse M100 [910- Unit 62,900


01295] - Black Mouse Cable USB
Black Value Optical Mouse, USB.

1 1 7 01 03 06 051 Mouse Logitech Optical Comfort Mouse M115 Unit 73,300


[910-001137] - Black Mouse Cable USB

1 1 7 01 03 06 052 Mouse Comfort Optical Mouse, USB. Unit 137,600


1 1 7 01 03 06 053 Mouse Logitech Optical Mouse M125 [910- Unit 150,100
01851] - Silver Mouse Cable USB
Optical Mouse, USB.

1 1 7 01 03 06 054 Mouse Logitech Optical Mouse M125 [910- Unit 150,100


001854] - Blue Mouse Cable USB
Optical Mouse, USB.

1 1 7 01 03 06 055 Mouse Logitech Optical Mouse M125 [910- Unit 150,100


001857] - White Mouse Cable USB
Optical Mouse, USB.

1 1 7 01 03 06 056 Mouse Havit Optical Mouse [HV-MS075]- Unit 52,000


BlackMouse Cable USB Ergonomic
Design, 800dpi.

1 1 7 01 03 06 057 Mouse Cliptec BlueOptic 4 Seasons Mouse Unit 46,000


[RZS978] - Winter Blue MouseCable
USB BlueOptic optical, 1000dpi, USB.

1 1 7 01 03 06 058 Mouse Cliptec EGo Wired Optical Mouse 100 ml 37,800


[RZS974] - Black Mouse Cable USB
Optical, 1000dpi, USB.

1 1 7 01 03 06 059 Mouse Cliptec EGo Wired Optical Mouse Unit 37,800


[RZS974] - Blue Mouse Cable USB
Optical, 1000dpi, USB.

1 1 7 01 03 06 060 Mouse Cliptec EGo Wired Optical Mouse Unit 37,800


[RZS974] - Grey Mouse Cable USB
Optical, 1000dpi, USB.

1 1 7 01 03 06 061 Mouse Sensonic Optical Mouse [M35] – Unit 77,500


SummerMouse Cable USB Optical.
1000 dpi, USB.

1 1 7 01 03 09 PERLENGKAPAN DINAS
1 1 7 01 03 09 001 Pakaian Dinas Pegawai/Perawat Beserta Kelengkapannya Katun / Sejenis Uk. 3 Meter Stell -
dan termasuk Ongkos Jahit

ASSET LANCAR 1.1 Page 76 of 207


1 1 7 01 03 09 002 Pakaian Kerja Dokter Beserta Kelengkapannya dan Katun / Sejenis Uk. 3 Meter Stell -
termasuk Ongkos Jahit
1 1 7 01 03 09 003 Pakaian Kerja Sopir/Tenaga Kebersihan/Out Sourcing Katun / Sejenis Uk. 3 Meter Stell -
Beserta Kelengkapannya dan termasuk Ongkos Jahit
1 1 7 01 03 09 004 Pakaian Kerja Satpam Beserta Kelengkapannya dan Katun / Sejenis Uk. 3 Meter Stell -
termasuk Ongkos Jahit
1 1 7 01 03 09 005 Pakaian Sipil resmi Lengan Panjang Wol / Sejenis Stell 1,609,200
1 1 7 01 03 09 006 Pakaian Sipil Resmi Model Jas/Jas Mini Lengan Panjang Wol / Sejenis Stell 2,044,100

1 1 7 01 03 09 007 Pakaian Dinas Resmi Lengan Panjang Bernuansa Semi Sutera Potong 516,800
Kedaerahan
1 1 7 01 03 09 008 Ikat Pinggang Garuda Kualitas Bagus Buah 78,900
1 1 7 01 03 09 009 Ikat Pinggang Korpri Kualitas Bagus Buah 78,900
1 1 7 01 03 09 010 Lencana Korpri Biasa / Tipis Kualitas Bagus Buah 14,600
1 1 7 01 03 09 011 Lencana Korpri Mutu Baik / tebal Buah 28,900
1 1 7 01 03 09 012 Papan Nama Mutu Baik  Buah 36,400
1 1 7 01 03 09 013 Lambang Kemdagri Sulaman set 6,400
1 1 7 01 03 09 014 Lambang Pemda Sulaman Set 9,800
1 1 7 01 03 09 015 Topi Lapangan Hansip Kualitas Bagus buah 30,000
1 1 7 01 03 09 016 Sepatu Laras Panjang Standard ABRI Hitam Kulit Pasang 206,800
1 1 7 01 03 09 017 Training Pack Kualitas Biasa stell 243,200
1 1 7 01 03 09 018 Sepatu Sport Kualitas Bagus Pasang 165,800
1 1 7 01 03 09 019 Pakaian Sipil Harian DPRD Wol / Sejenis Stell 2,117,400
1 1 7 01 03 09 020 Pakaian Sipil Resmi DPRD Wol / Sejenis Stell 2,689,600
1 1 7 01 03 09 021 Pakaian Sipil Lengkap DPRD Wol / Sejenis Stell 3,420,000
1 1 7 01 03 09 022 Pakaian Dinas Harian Lengan Panjang DPRD Wol / Sejenis Stell 2,689,600
1 1 7 01 03 09 023 Pakaian Khas Daerah DPRD Kualitas bagus Potong 668,800

1 1 7 01 03 12 SUVENIR/CENDERA MATA
1 1 7 01 03 12 001 Buku Agenda Kecil buah 35,000
1 1 7 01 03 12 002 Bahan Tenun Khas Daerah Kualitas Bagus Potong
1 1 7 01 03 12 003 Bahan Tenun Khas Daerah Kualitas Sedang Potong
1 1 7 01 03 12 004 Bahan Tenun Khas Daerah Kualitas Biasa Potong
1 1 7 01 03 12 005 Vandel Kristal Buah
1 1 7 01 03 12 006 Vandel Kuningan Buah

1 1 7 01 04 OBAT-OBATAN
1 1 7 01 04 01 OBAT
OBAT DAN ALAT KONTRASEPSI
1 1 7 01 04 01 001 Obat Suntik KB Depo Progeston Vial 8,600
1 1 7 01 04 01 002 Obat Suntik KB Depo Andalan Vial 11,600
1 1 7 01 04 01 003 Obat Suntik KB Depo Progeston Vial 6,500
1 1 7 01 04 01 004 Pil KB Planotab Cycle 7,286
1 1 7 01 04 01 005 Pil KB Migroginor Cycle 15,588
1 1 7 01 04 01 006 Pil KB Pil KB Cycle 4,575
1 1 7 01 04 01 007 Implant Kategori 2 Kapsul Silastic Silikon Set 278,898
1 1 7 01 04 01 008 IUD Coper T Buah 84,720
1 1 7 01 04 01 009 Kondom Lateks Lusin 26,856
OBAT DAN ALAT NON KONTRASEPSI
1 1 7 01 04 01 009 IUD KIT Strelisator Listrik Set 4,907,900
1 1 7 01 04 01 010 IUD KIT Strelisator Uap Set 4,827,346
1 1 7 01 04 01 011 Implant Kit Set 2,502,300
1 1 7 01 04 01 012 Obgin Bad Unit 6,255,200
1 1 7 01 04 01 013 APE (Alat Permainan Edukatif) Set 2,213,100
1 1 7 01 04 01 014 Plank KIE KB 1 x 1,5 M Set 3,271,800
PUPUK

ASSET LANCAR 1.1 Page 77 of 207


1 1 7 01 04 01 016 Pupuk Urea Kaltim (Non subsidi) Karung 250,000
1 1 7 01 04 01 017 Pupuk SP Non Subsidi ( 50 Kg) 36% Zak 322,500
1 1 7 01 04 01 018 Pupuk SP-18 ( non subsidi ) SP-18 Karung 193,500
1 1 7 01 04 01 019 Pupuk ZA Cap Kuda (non subsidi) ZA Karung 200,000
1 1 7 01 04 01 020 Pupuk NPK Mutiara (non subsidi) NPK Karung 150,000
1 1 7 01 04 01 021 Pupuk NPK Basf (non subsidi) NPK Karung 115,000
1 1 7 01 04 01 022 Pupuk kandang Kering Karung 12,900
1 1 7 01 04 01 023 Pupuk Organik Cair Liter 25,000
1 1 7 01 04 01 024 Pupuk Pelengkap Cair dan ZPT Uk. 100 CC Cair Botol 15,000
1 1 7 01 04 01 025 Pupuk Pelengkap Cair (PPC) dan ZPT Uk. 500 CC Cair Botol 65,000
1 1 7 01 04 01 026 Pupuk Pelengkap Cair (PPC) dan ZPT Uk. 250 CC Cair Botol 35,000
1 1 7 01 04 01 027 Kapur Pertanian Dolomit, 50 Kg/Zak, Tepung Zak 30,000
1 1 7 01 04 01 028 Pupuk Kandang Kering Zak 20,000

OBAT-OBATAN PERTANIAN/PESTISIDA
INSEKTISIDA
1 1 7 01 04 01 026 Aplaud Alodan 50 EC 100 gr Tepung Bks 23,000
1 1 7 01 04 01 027 Astetrin 80 cc Cair Botol 20,000
1 1 7 01 04 01 028 Astetrin 200 cc Cair Botol 40,000
1 1 7 01 04 01 029 Baylucide Decis 50 EC 80 cc Cair Botol 23,000
1 1 7 01 04 01 030 Buldok 80 cc Cair Botol 32,250
1 1 7 01 04 01 031 Bestok 80 cc Cair Botol 20,000
1 1 7 01 04 01 032 Curater 3G Jenis Tepung Bks 40,000
1 1 7 01 04 01 033 Confidor 60 cc Cair Botol 40,000
1 1 7 01 04 01 034 Decis 50 cc Botol 18,000
1 1 7 01 04 01 035 Decis 100 cc Botol 28,000
1 1 7 01 04 01 036 Dursban 500 cc Cair Botol 50,000
1 1 7 01 04 01 037 Fokker 100 cc Cair Botol 500,000
1 1 7 01 04 01 038 Fentrin 100 cc Cair Botol 21,930
1 1 7 01 04 01 039 Hopcin 500 cc Cair Botol 55,000
1 1 7 01 04 01 040 Hamador 100 cc Cair Botol 15,000
1 1 7 01 04 01 041 Lebaycit 100 cc Cair Botol 34,830
1 1 7 01 04 01 042 Lannate TSP 15 gr Tepung Bks 6,000
1 1 7 01 04 01 043 Lannate WP 15 gr Tepung Bks 6,000
1 1 7 01 04 01 044 Meothrin 100 cc Cair Botol 17,000
1 1 7 01 04 01 045 Lujon 400 ml Botol 18,060
1 1 7 01 04 01 046 Sidabas 500 ml Botol 40,500
1 1 7 01 04 01 047 Sidabas 100 ml Botol 15,000
1 1 7 01 04 01 048 Instop 100 ml Botol 25,000
1 1 7 01 04 01 049 Glensed 100 ml Botol 25,000
1 1 7 01 04 01 050 Sherpa 100 cc Botol 21,930
1 1 7 01 04 01 051 Pegasus 100 cc Botol 75,000
1 1 7 01 04 01 052 Bestox 100 cc Botol 18,000
1 1 7 01 04 01 053 Fury 100 cc Botol 18,000
FUNGISIDA
1 1 7 01 04 01 054 Antracol 100cc Botol 35,000
1 1 7 01 04 01 055 Bion-M 500 gr Bks 180,000
1 1 7 01 04 01 056 Dithane 200 gr Bks 25,000
1 1 7 01 04 01 057 Delsen 100 gr Bks 25,000
1 1 7 01 04 01 058 Trichoderma Padat/Tepung atau sejenisnya Kg 20,000
HERBISIDA
1 1 7 01 04 01 059 Ally 5 gr tepung Bks 5,000
1 1 7 01 04 01 060 Ally 100 gr tepung Bks 77,000
1 1 7 01 04 01 061 Ally Plus 40 gr tepung Bks 12,000
1 1 7 01 04 01 062 Basmilang 1 Liter cair Botol 60,000
1 1 7 01 04 01 063 DMA 6 200 cc cair Botol 25,000
1 1 7 01 04 01 064 DMA 6 400 cc cair Botol 50,000

ASSET LANCAR 1.1 Page 78 of 207


1 1 7 01 04 01 065 Gramoxone 500 cc Botol 60,000
1 1 7 01 04 01 066 Gramoxone 1 liter Botol 95,800
1 1 7 01 04 01 067 Gramoxone 5 liter Botol 300,000
1 1 7 01 04 01 068 Gramoxone 20 liter Botol 950,000
1 1 7 01 04 01 069 Garlon 1 liter cair Botol 225,750
1 1 7 01 04 01 070 Roundup 1 liter Botol 75,000
1 1 7 01 04 01 071 Roundup 4 liter Botol 280,000
1 1 7 01 04 01 072 Roundup 20 liter Botol 1,000,000
1 1 7 01 04 01 073 Bom-up 1 liter Cair Botol 60,000
1 1 7 01 04 01 074 Bom-up 5 liter Cair Botol 275,000
1 1 7 01 04 01 075 Bom-up 20 liter Cair Botol 1,419,000
1 1 7 01 04 01 076 Brantaxone 1 liter Botol 60,000
1 1 7 01 04 01 077 Marxone 1 liter Botol 60,000
1 1 7 01 04 01 078 Sidafos 1 liter Botol 60,000
1 1 7 01 04 01 079 Love Up 1 liter Botol 60,000
VITAMIN TERNAK/IKAN
1 1 7 01 04 01 080 Multivitamin dan Mineral Vet – Oxy LA 50 ml Botol 105,300
1 1 7 01 04 01 081 Injeksi Kalsium Calcidex Plus 100 ml Botol 76,600
1 1 7 01 04 01 082 Kalsium, Magnesium dan Fosfor Injectamin 20 ml Botol 35,300
1 1 7 01 04 01 083 Injeksi Multivitamin (A, B Komplek, D dan E) Injectamin 50 ml Botol 73,000
1 1 7 01 04 01 084 Injeksi Multivitamin (A, B Komplek, D dan E) Injectamin 100 ml Botol 134,000
1 1 7 01 04 01 085 Injeksi Multivitamin (A, B Komplek, D dan E) Biosan – TP 20 ml Botol 47,500
1 1 7 01 04 01 086 Suplemenn Penguat (Tonic) Biosan – TP 50 ml Botol 95,500
1 1 7 01 04 01 087 Suplemenn Penguat (Tonic) Biosan – TP 100 ml Botol 158,300
1 1 7 01 04 01 088 Suplemenn Penguat (Tonic) Cair Vial 72,000
1 1 7 01 04 01 089 Ovaprim Ampicillin & Colistin 100 gr 44,800
1 1 7 01 04 01 090 Ampibio Suspensi Antimikroba 100 ml 57,000
(Ciprofloxacin)
1 1 7 01 04 01 091 Cipromied Injeksi Intramammary (Cloxacillin 6 Syringe 255,700
& Ampicillin)
1 1 7 01 04 01 092 Dryclox Biovit 100 Gr Bks 92,000
1 1 7 01 04 01 093 Multivitamin Bro – Gesat 1 Kg Bks 194,800
1 1 7 01 04 01 094 Multivitamin mineral dan asam amino 100 ml Botol 60,000
1 1 7 01 04 01 095 Fish Imunovid Padat Botol 46,400
1 1 7 01 04 01 096 Lebasit Antelmintika (Oxfendazole) 12 Bolus 50,800
1 1 7 01 04 01 097 Verm - O Oxfendazole 10 Kaplet 31,700
1 1 7 01 04 01 098 Verm - O Dosis/5 ml Botol 174,400
1 1 7 01 04 01 099 Ivomec Dosis (10 gr) Sachet 165,800
1 1 7 01 04 01 100 Diazinon/Tepung Dosis (125 mg) Sachet 69,300
1 1 7 01 04 01 101 Trypamidium/Tepung Dosis (60 ml) Botol 15,400
OBAT-OBATAN TERNAK/IKAN
1 1 7 01 04 01 103 Betadine Solution/Cairan Dosis (100 ml) Botol 18,000
1 1 7 01 04 01 104 Rodalon/Cairan 100 ml Botol 67,000
1 1 7 01 04 01 105 Injeksi Analgesik, Antipiretik, Antipasmodik 100 ml Botol 39,000
1 1 7 01 04 01 106 Larutan Suspensi Anti Kembung 100 ml Botol 54,800
1 1 7 01 04 01 107 Vaksin Lasota/Cairan 50 Dosis vial 15,400
1 1 7 01 04 01 108 Vaksin ND Caprivac NBA-K Vaksin Aktif Botol 547,900
1000 Dosis
1 1 7 01 04 01 109 Vaksin ND, IB dan Avian Influenza (Flu Burung) Caprivac NB-R Vaksin Aktif 1000 Botol 30,400
Dosis
1 1 7 01 04 01 110 Antibiotik Duocycline LA 100 ml Botol 132,500
1 1 7 01 04 01 111 Oxitetracyclin Betamox LA 100 ml Botol 132,800
1 1 7 01 04 01 112 Oxitetracyclin Vet - Oxy 100 ml Botol
1 1 7 01 04 01 113 Oxitetracyclin Calcides 500 ml Botol
1 1 7 01 04 01 114 Amoxicillin Penstrep Inj 100 ml Botol 143,800
1 1 7 01 04 01 115 Penicillnt - Streptomicin Aquarim 100 ml Botol 138,400
1 1 7 01 04 01 116 Sulfonamide - Trimethorim Benzalkonium Chlorida 100 ml Botol 8,500

ASSET LANCAR 1.1 Page 79 of 207


1 1 7 01 04 01 117 Destan Thymol, Formaldehyde & Botol 14,000
Benzalkonium Chlorida 100 ml
1 1 7 01 04 01 118 Fumisid Glularaldehyde, Benzalkonium Botol 172,900
Chlorida, Isopropanol 100 ml
1 1 7 01 04 01 119 Pinocid Capriglandin Inj Botol 478,400
Dinopprosttromethamino dan
Benzyl Alcohol) 20 ml
1 1 7 01 04 01 120 Hormon PGF2α Sintesis (Penyerentak Birahi) Capritocin 50 ml Botol 93,200
1 1 7 01 04 01 121 Hormon Reproduksi CM – Premix 25 x 1 (Kg) Karung 1,217,300
1 1 7 01 04 01 122 Feed Supplement (Multimineral) Premix CM – Premix 1 x 25 (Kg) Karung 1,180,700
1 1 7 01 04 01 123 Feed Supplement (Multimineral) Premix Sanmix – B 25 x 1 (Kg) Karung 766,900
1 1 7 01 04 01 124 Feed Additive Premix Sanmix – B 1 x 25 (Kg) Karung 663,900
1 1 7 01 04 01 125 Feed Additive Premix Cairan Dosis 3,800
1 1 7 01 04 01 126 Vitamin Terta Chlor 50 Kapsul Botol 10,000
1 1 7 01 04 01 127 Vitamin Tepung Vitacid 30 Sachet Kotak 60,000
1 1 7 01 04 01 128 Malacyte Green Padat Kg 171,828
1 1 7 01 04 01 129 Methylen Blue Padat Kg 214,785
1 1 7 01 04 01 130 Calcium Permanganat Padat Visal 25,774
1 1 7 01 04 01 131 Aquabides Oxy TC 100 ml 35,798
1 1 7 01 04 01 132 Tetra cline 10 cc Botol 522,644
1 1 7 01 04 01 133 Ovaprim Spectrum luas vet Oxy LA / cairan Dosis 37,659
Isi 10 ml
1 1 7 01 04 01 134 Antibiotika Spectrum sempit pyroxi / cairan Isi Dosis 15,178
10 ml
1 1 7 01 04 01 135 Antibiotika Corydon / cairan Isi 10 ml Dosis 4,868
1 1 7 01 04 01 136 Antibiotika Spectrum luas faston (2 bolus) Dosis 17,756
1 1 7 01 04 01 137 Anti parasit interna Monil Dosis 20,190
1 1 7 01 04 01 138 Anti parasit interna Verm-O Dosis 50,117
1 1 7 01 04 01 139 Anti parasit interna Verm-O (2 Kaplet) Dosis 15,178
1 1 7 01 04 01 140 Anti parasit interna Ivomec Isi 15 ml Dosis 142,904
1 1 7 01 04 01 141 Anti parasit Externa Diazinon / Tepung (10 g) Bungkus 163,523
1 1 7 01 04 01 142 Anti parasit Externa Trypamidium / Tepung (125 mg) Bungkus 68,158
1 1 7 01 04 01 143 Anti parasit darah Betadine solution / cairan (60 ml) botol 15,178
1 1 7 01 04 01 144 Anti infeksi luar Rodalon / cairan (100 ml) botol 17,756
1 1 7 01 04 01 145 Anti infeksi luar cairan (100 ml) botol 80,616
1 1 7 01 04 01 146 Anti Bloat Cairan 100 ml Botol 13,603
1 1 7 01 04 01 147 Aquades (vial) perinjeksi Laktat Ringer / cairan (500 ml) Botol 33,936
1 1 7 01 04 01 148 Infus Dektrose 5% / cairan (500 ml) Botol 33,936
1 1 7 01 04 01 149 Infus Dektrose 5% / cairan (1.000 ml) Botol 50,117
1 1 7 01 04 01 150 Lebasit Ultra mineral / Tepung Kg 12,458
1 1 7 01 04 01 151 Mineral Milton S / Mineral Block Kg 24,915
1 1 7 01 04 01 152 Mineral Mineral itik / Tepung Kg 15,178
1 1 7 01 04 01 153 Mineral 100 ml Botol 264,902
1 1 7 01 04 01 154 Vaksin Hydropak Vaksi SE /cairan Dosis 4,439
1 1 7 01 04 01 155 Vaksin septivet Rabisim / cairan Dosis 24,915
1 1 7 01 04 01 156 Vaksin rabies Rabivet / cairan Dosis 30,643
1 1 7 01 04 01 157 Vaksin rabies Hexadog / cairan Dosis 104,242
1 1 7 01 04 01 158 Vaksin rabies Pentadog /cairan Dosis 495,008
1 1 7 01 04 01 159 Vaksin rabies Cairan Liter 152,354
1 1 7 01 04 01 160 Kapur Tohor Cairan 100 Gram Bungkus 42,957
1 1 7 01 04 01 161 Vitamin Tepung Bungkus 50,976
1 1 7 01 04 01 162 Belerang Padat 70% Bungkus 10,965
1 1 7 01 04 01 163 Alkohol Cairan Botol 12,900
1 1 7 01 04 01 164 Spritus Cairan Botol 50,955
1 1 7 01 04 01 165 Metarizium Tepung Bungkus 50,955
1 1 7 01 04 01 166 Terramicyn Salap 15 gram Tube

ASSET LANCAR 1.1 Page 80 of 207


1 1 7 01 07 179 NATURA DAN PAKAN
1 1 7 01 07 01 180 NATURA
1 1 7 01 07 01 181 Pisang sale Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 182 Keripik Pisng Manis Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 183 Keripik Pisang Asin Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 184 Wajid Pisang Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 185 Keripik Jagung Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 186 Keripik Pisang Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 187 Peyek Udang Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 188 Madu Salak Bungkus Plasitk Sedang Botol 15,000
1 1 7 01 07 01 189 Kurma Salak Bungkus Plasitk Sedang Kotak 10,000
1 1 7 01 07 01 190 Dodol Besar Bungkus Plasitk Sedang Kotak 15,000
1 1 7 01 07 01 191 Nagogo Bungkus Plasitk Sedang Botol 5,000
1 1 7 01 07 01 192 Roda Gila (Renginang) Bungkus Plasitk Sedang Bungkus 10,000
1 1 7 01 07 01 193 Kecap Salak Botol 300 ml Botol 10,000
1 1 7 01 07 01 194 Keripik Salak Kotak 100 gr Kotak 15,000
1 1 7 01 07 01 195 Gula Semut 200 gr Bungkus 15,000
1 1 7 01 07 01 196 Gula Semut 500 gr Bungkus 30,000
1 1 7 01 07 01 197 Gula Semut 1 Kg Bungkus 60,000
1 1 7 01 07 01 198 Kue Jahe Tples 250 gr Bungkus 40,000
1 1 7 01 07 01 199 Kopi Luwak Tabo 100 gr Bungkus 100,000
1 1 7 01 07 01 200 Kopi Jantan Tabo 100 gr Bungkus 30,000
1 1 7 01 07 01 201 Kopi Premiunm Tabo 100 gr Bungkus 15,000
1 1 7 01 07 01 202 Kopi Special (AKS) 250 gr Bungkus 500,000
1 1 7 01 07 01 203 Kopi Pea Berry (AKS) 100 gr Bungkus 30,000
1 1 7 01 07 01 204 Kopi Biasa (AKS) 200 gr Bungkus 15,000
1 1 7 01 07 01 205 Kopi Salak 200 gr Kotak 50,000
1 1 7 01 07 01 206 Ikan Sale Limbat kg 200,000
1 1 7 01 07 01 207 Ikan Sale Baung kg 250,000
1 1 7 01 07 01 208 Ikan Sale Lappam kg 75,000
1 1 7 01 07 01 209 Ikan asin Gadapang kg 75,000
1 1 7 01 07 01 210 Ikan asin Aso-aso kg 200,000
1 1 7 01 07 01 211 Udang Tawar Khas Danau siais kg 50,000
1 1 7 01 07 01 212 Ikan Nila Asin kg 50,000
1 1 7 01 07 01 213 Garam Kg 12,000

1 1 7 01 07 02 PAKAN
1 1 7 01 07 02 001 Pakan Ternak Unggas Pur Kg 8,000
1 1 7 01 07 02 002 Pakan Ternak Unggas Tepung Kg 15,900
1 1 7 01 07 02 003 Pakan Ternak Unggas Tepung Kg 14,800
1 1 7 01 07 02 004 Pakan Ternak Unggas Butiran Kg 15,900
1 1 7 01 07 02 005 Pakan Ternak Unggas Butiran Kg 14,800
1 1 7 01 07 02 006 Jagung Pipil Butiran Kg 5,000
1 1 7 01 07 02 007 Jagung Giling Pecah Kg 7,000
1 1 7 01 07 02 008 Bibit Rumput King Grass Stek 900
1 1 7 01 07 02 009 Bibit Rumput Rumput Gajah Stek 900
1 1 7 01 07 02 010 Bibit Rumput Paspalum dilatatum Pols 900
1 1 7 01 07 02 011 Bibit Rumput Steriya Splendida Pols 900
1 1 7 01 07 02 012 Bibit Rumput Brachiaria Decumb Pols 900
1 1 7 01 07 02 013 Pakan/ Pellet Ikan 888 S-2 Kadar Protein min.30% Lemak >5% Zak 405,000
1 1 7 01 07 02 014 Pakan/ Pellet Ikan 888 S-3 Kadar Protein min.30% Lemak >5% Zak 402,000
1 1 7 01 07 02 015 Pakan/ Pellet Ikan 888 S-4 Kadar Protein min.30% Lemak >5% Zak 402,000
1 1 7 01 07 02 016 Pakan/ Pellet Ikan 788-2 Kadar Protein min.30% Lemak >5% Zak 375,000
1 1 7 01 07 02 017 Pakan/ Pellet Ikan 788-3 Kadar Protein min.30% Lemak >5% Zak 375,000
1 1 7 01 07 02 018 Pakan/ Pellet Ikan 781-1 Kadar Protein min.30% Lemak >5% Zak 210,000
1 1 7 01 07 02 019 Pakan/ Pellet Ikan 781-2 Kadar Protein min.30% Lemak >5% Zak 383,000

ASSET LANCAR 1.1 Page 81 of 207


1 1 7 01 07 02 020 Pakan/ Pellet Ikan 781-3 Kadar Protein min.30% Lemak >5% Zak 378,000
1 1 7 01 07 02 021 Pakan/ Pellet Ikan F 500 Kadar Protein min.30% Lemak >5% Zak 190,000
1 1 7 01 07 02 022 Pakan/ Pellet Ikan F 1000 Kadar Protein min.30% Lemak >5% Zak 160,000
1 1 7 01 07 02 023 Pakan/ Pellet Ikan F 999 Kadar Protein min.30% Lemak >5% Zak 180,000
1 1 7 01 07 02 024 Pakan/Pellet Udang Starter Kg 32,121
1 1 7 01 07 02 025 Pakan/Pellet Udang Grower Kg 32,121
1 1 7 01 07 02 026 Pakan/Pellet Udang Finisher Kg 32,121
1 1 7 01 07 02 027 Pakan/Pellet Udang Lobster Grower Kg 32,121
1 1 7 01 07 02 028 Dedak Halus Halus Kg 5,611
1 1 7 01 07 02 029 Dedak Kasar Kasar Kg 3,870

1 1 7 02 02 PIPA
1 1 7 02 02 01 PIPA AIR BESI TUANG (DCI)
1 1 7 02 02 01 001 Besi Pipa Galvanish Medium 1/2 inchi meter 70,000
1 1 7 02 02 01 002 Besi Pipa Galvanish Medium 3/4 inchi meter 85,000
1 1 7 02 02 01 003 Besi Pipa Galvanish Medium 1 inchi meter 90,000
1 1 7 02 02 01 004 Besi Pipa Galvanish Medium 1 1/4 inchi meter 120,000
1 1 7 02 02 01 005 Besi Pipa Galvanish Medium 1 1/2 inchi meter 130,000
1 1 7 02 02 01 006 Besi Pipa Galvanish Medium 2 inchi meter 125,000
1 1 7 02 02 01 007 Besi Pipa Galvanish Medium 2 1/2 inchi meter 145,000
1 1 7 02 02 01 008 Besi Pipa Galvanish Medium 3 inchi meter 240,000
1 1 7 02 02 01 009 Besi Pipa Galvanish Medium 4 inchi meter 620,000
1 1 7 02 02 01 010 Besi Pipa Galvanish Medium 5 inchi meter 710,000
1 1 7 02 02 01 011 Besi Pipa Galvanish Medium 6 inchi meter 790,000
1 1 7 02 02 01 012 Besi Pipa Galvanish Medium 8 inchi meter
1 1 7 02 02 01 013 Pipa Besi Hitam dia.2.5 inch Meter 250,000
1 1 7 02 02 01 014 Pipa Besi Hitam dia.1.5 inch Meter 170,000
1 1 7 02 02 01 015 Pipa Hitam 1.5"" tb. 2,8 mm Meter 220,000
1 1 7 02 02 01 016 Pipa Hitam 2"" tb. 2,8 mm Meter 330,000
1 1 7 02 02 01 017 Pipa Hitam 4"" tb. 2,8 mm Meter 570,000

1 1 7 02 02 06 PIPA PLASTIK PVC (UPVC)


1 1 7 01 01 03 001 Pipa PVC Uk. 0,5" m' 5,483
1 1 7 01 01 03 002 Pipa PVC Uk. 0,75" m' 7,560
1 1 7 01 01 03 003 Pipa PVC Uk. 1 " m' 10,384
1 1 7 01 01 03 004 Pipa PVC Uk. 1,25" m' 15,618
1 1 7 01 01 03 005 Pipa PVC Uk. 1,5" m' 17,861
1 1 7 01 01 03 006 Pipa PVC Uk. 2" m' 22,845
1 1 7 01 01 03 007 Pipa PVC Uk. 2,5" m' 33,395
1 1 7 01 01 03 008 Pipa PVC Uk. 3" m' 45,025
1 1 7 01 01 03 009 Pipa PVC Uk. 4" m' 74,683
1 1 7 01 01 03 010 Pipa PVC Uk. 5" m' 82,907
1 1 7 01 01 03 011 Pipa PVC Uk. 6" m' 103,010
1 1 7 01 01 03 012 Pipa PVC Uk. 7" m' 116,303
1 1 7 01 01 03 013 Pipa PVC AW Uk. 3" m' 44,402
1 1 7 01 01 03 014 Pipa PVC AW Uk. 4 " m' 68,685

1 1 7 02 02 07 P I P A LAINNYA
1 1 7 02 02 07 001 Besi Pipa putih (Stainless) SCH 40 Welded uk. 1 inchi Batang 70,000
1 1 7 02 02 07 002 Besi Pipa putih (Stainless) SCH 40 Welded uk. 2 inchi Batang 180,000
1 1 7 02 02 07 003 Pipa Paralon 1.5 inchi Meter 25,000

ASSET LANCAR 1.1 Page 82 of 207


LAMPIRAN I KEPUTUSAN BUPATI TAPANULI SELATAN

NDAR SATUAN HARGA

KEUNTUNG HARGA MAX


AN 12%/15%
DAN
INFLASI
3.28%

6 7

26,059 185,500
37,266 265,200
19,620 139,600
29,430 209,400
31,389 223,400
31,389 223,400
31,389 223,400
30,842 219,600
17,889 127,300
26,059 185,500
31,389 223,400
26,059 185,500
23,827 169,600
18,208 129,600
40,652 289,300
46,256 329,200
54,623 388,700
63,051 448,800
75,079 534,400
83,248 592,600
595,900
137 1,000
562 4,000
1,714 14,200
1,612 13,400
1,092 9,000
1,764 14,600
1,453 12,100
848 7,000
1,092 9,000
1,041 8,700
622 5,200

ASSET LANCAR 1.1 Page 83 of 207


58,720 487,300
58,720 487,300
4 38
1,346 11,200
2,374 19,700
3,757 31,100
4,113 34,100
1,675 13,900
66,172 549,100
106,194 881,300
81,417 675,600
543,806 4,513,000
14,585 121,000
3,047 27,500
69,460 576,400
4,886 35,200
5,295 44,000
4,316 35,900
3,846 31,900
4,316 35,900
2,158 17,900
4,049 33,600
3,846 31,900
4,278 35,500
5,953 49,400
685 5,700
190 1,500
7,845 65,100
2,767 23,000
10,802 89,700
3,988 26,100
19,878 165,000
4,697 38,900
9,038 75,000
3,034 25,200
2,678 22,200
9,114 75,700
9,025 74,900
9,025 74,900
4,100 34,000
2,145 17,800
3,034 25,200
9,114 75,700
5,814 48,300
3,529 29,300
28,129 233,400
18,215 151,100
6,867 57,000
5,814 48,300
863 7,200
7,159 59,400
34,933 289,900
26,448 219,500
32,432 269,200
21,681 180,000

ASSET LANCAR 1.1 Page 84 of 207


533 4,400
153,567 1,274,500
292 2,400
3,313 27,500
27,126 225,200
8,086 67,100
3,364 27,900
98,709 819,200
78,735 653,400
123,502 1,025,000
163,799 1,359,400
211,887 1,758,500
359,474 2,983,300
475,544 3,946,500
637,949 5,294,300
1,131,087 9,386,900
1,630,031 13,527,600
24,765 205,500
1,426,809 11,841,100
959,635 7,964,000
941,178 7,810,800
13,176 109,300
30,122 250,000
626,287 5,197,500
5,877 48,700
1,776,441 14,742,600
28,421 235,800
15,055 125,000
656,677 5,449,700
10,510 87,200
4,874 40,500
7,350 60,900
52,424 435,100
77,837 645,900
428,978 3,560,000
58,720 487,300
8,137 67,500
3,694 30,700
33,549 278,400
2,094 17,400
2,094 17,400
20,081 166,700
44,313 367,700
23,929 198,600
3,757 31,100
279 2,300
7,553 62,700
914 7,600
3,288 27,300
12,770 105,900
6,195 51,400
2,094 17,400
6,512 54,000
6,575 54,600

ASSET LANCAR 1.1 Page 85 of 207


3,174 26,300
5,395 44,800
5,395 44,800
4,595 38,200
4,532 37,600
7,553 62,700
347,969 2,887,800
139,312 1,156,100
337,396 2,800,100
335,974 2,788,300
58,720 487,300
6,512 54,000
9,406 78,100
13,849 115,000
23,597 195,800
32,788 272,100
38,030 315,600
39,350 326,600
3,605 29,900
4,874 40,500
10,815 89,800
173,090 1,436,500
79,881 663,000
2,501 20,800
546 4,500
266 2,200
25,133 208,600
12,325 102,300
12,275 101,900
2,742 22,800
14,445 119,900
3,821 31,700
239,515 1,987,700
6,195 51,400
4,455 37,000
2,590 21,500
1,333 11,100
1,231 10,200
292,155 2,424,600
254 2,100
503 4,200
673 5,600
1,295 10,800
1,041 8,700
3,021 25,100
2,298 19,000
5,750 47,700
8,543 71,000
42,777 355,000
4,659 38,600
343 2,900
1,434 11,900
43,958 364,800
54,100 449,000
78,243 649,300

ASSET LANCAR 1.1 Page 86 of 207


19,040 158,100
104,011 863,200
170,614 1,415,900
206,512 1,713,800
237,548 1,971,400
2,513 20,900
61,310 508,900
114,077 946,800
23,483 194,900
419 3,500
1,675 13,900
6,584 54,700
44,709 371,000
226,798 1,882,200
2,181,722 18,106,000
22,582,755 187,413,300
37,751 313,300
75,908 630,000
5,877 48,700
10,066 83,500
43,615 362,000
7,258 60,300
7,781 64,600
7,432 61,700
13,587 112,800
12,077 100,200
16,026 133,000
18,464 153,200
21,484 178,300
25,548 212,000
91,840 762,200
16,142 134,000
20,322 168,600
6,735 55,900
7,432 61,700
20,903 173,500
37,742 313,200
72,870 604,800
101,612 843,300
18,000 149,400
31,935 265,000
1,161 9,700
1,742 14,400
679 5,600
755 6,300
2,032 16,800
3,919 32,600
1,568 13,000
6,097 50,600
7,490 62,200
9,116 75,700
15,230 126,400
10,742 89,100
16,548 137,300
7,055 58,500
8,884 73,700

ASSET LANCAR 1.1 Page 87 of 207


14,499 120,300
17,013 141,200
18,871 156,600
49,354 409,600
78,386 650,500
182,902 1,517,900
261,288 2,168,400

307,739 2,553,900

1,858,048 15,419,800

2,845,136 23,611,600

191,611 1,590,200
43,548 361,400
22,645 187,900
1,951 16,200
6,968 57,900
9,871 82,000
3,774 31,400
697 5,800
35,361 293,500

47,206 391,700

55,393 459,700

517,931 4,298,300
644,510 5,348,800
2,101,917 17,443,700

400,642 3,324,900
5,226 43,300
6,968 57,900
173,031 1,435,900
220,643 1,831,100
37,742 313,200
55,161 457,800
59,864 496,800
94,644 785,400
119,031 987,800
8,129 67,400
24,968 207,200
34,316 284,800
64,161 532,500
226,450 1,879,200
7,258 60,300
7,839 65,000
9,581 79,500
12,281 102,000
8,419 69,900
9,581 79,500
11,322 93,900

ASSET LANCAR 1.1 Page 88 of 207


14,516 120,500
13,964 115,900
14,603 121,200
795 6,600
6,370 52,900
1,190 9,900
508,060 4,216,400
330,965 2,746,700
124,373 1,032,100
400,642 3,324,900
189,173 1,569,900
119,496 991,700
71,709 595,100
3,310 27,500
3,658 30,400
6,939 57,500
87,860 Err:522
87,860 Err:522
47,169 Err:522
71,352 Err:522
45,682 Err:522
42,555 Err:522
48,138 Err:522
157,313 Err:522
1,258,313 Err:522
955,863 Err:522
661,139 Err:522
494,859 Err:522
114,704 Err:522
38,951 Err:522
68,741 Err:522
28,170 Err:522
10,620 Err:522
19,192 Err:522
886 Err:522
882 Err:522
1,698 Err:522
283,987 Err:522
1,099 Err:522
549 Err:522
297 Err:522
2,589 Err:522
4,661 Err:522
7,608 Err:522
11,954 Err:522
541 Err:522
22,900 Err:522
30,600 Err:522
18,300 Err:522
22,900 Err:522
53,500 Err:522
6,100 Err:522
439,621 2,877,100
28,130 184,100
3,331 21,800
8,633 56,500

ASSET LANCAR 1.1 Page 89 of 207


214,974 1,406,900
3,331 21,800
54,336 355,600
52,548 343,900
55,726 364,700
214 1,400
54,137 354,300
351 2,300
39,881 261,000
18,978 124,200
174,268 1,140,500
87,065 569,800

22,920 190,200
162,106 1,345,300
443,578 3,681,300
334,999 2,780,100
289,755 2,404,700
288,983 2,398,200
124,838 1,036,000

212,392 1,762,600

212,392 1,762,600
212,392 1,762,600
212,392 1,762,600
212,392 1,762,600
212,392 1,762,600
212,392 1,762,600
212,392 1,762,600
204,752 1,699,300
655,970 5,443,900

15,280 126,800
12,224 101,400
10,696 88,800
16,244 134,900
29,705 246,500
9,856 81,800
49,475 410,600
19,864 164,900
19,100 158,500
7,490 62,200
6,741 56,000
6,110 50,700
5,559 46,100
10,309 85,600
217 1,800
394 3,300
690 5,700
-
2,292 19,000

ASSET LANCAR 1.1 Page 90 of 207


3,056 25,400
3,820 31,700
8,318 69,100
3,820 31,700
3,056 25,400
1,222 10,100
4,584 38,100
5,322 44,200
1,242 10,300
4,336 36,000
2,484 20,600
6,820 56,700
5,578 46,300
6,820 56,700
6,820 56,700
7,806 64,800
4,584 38,100
5,322 44,200
493 4,100
5,302 44,000
-
9,954 82,600
10,881 90,300
3,056 25,400
10,881 90,300
10,881 90,300
4,126 34,200
9,954 82,600
1,528 12,700
22,234 184,500
5,348 44,300
4,584 38,100
2,445 20,200
3,056 25,400
3,820 31,700
22,920 190,200
59,134 490,700
13,581 112,800
14,783 122,700
16,755 139,000
29,567 245,400
73,917 613,500
23,653 196,400
17,740 147,200
39,422 327,100
51,249 425,300
12,931 107,400
12,931 107,400
4,928 40,900
10,348 85,900
12,931 107,400
9,047 75,100
493 4,100
493 4,100
434 3,600
434 3,600

ASSET LANCAR 1.1 Page 91 of 207


434 3,600
4,080 33,900
611 5,100
5,204 43,200
2,139 17,700
53 400
92 800
1,070 8,900
2,292 19,000
2,139 17,700
1,986 16,500
4,890 40,600
8,251 68,500
993 8,300
45,840 380,400
993 8,300
229 1,900
1,146 9,500
1,070 8,900
1,528 12,700
382 3,200
2,139 17,700
413 3,400
1,222 10,100
2,292 19,000
4,202 34,900
764 6,400
2,063 17,200
856 7,200
1,951 16,200
1,734 14,400
1,951 16,200
976 8,100
976 8,100
1,518 12,700
976 8,100
976 8,100
2,060 17,100
976 8,100
976 8,100
2,168 18,000
1,478 12,300
1,478 12,300
976 8,100
1,963 16,300
976 8,100
1,566 13,000
976 8,100
2,168 18,000
2,168 18,000
1,910 15,800
976 8,100
976 8,100
2,168 18,000
1,478 12,300
688 5,700

ASSET LANCAR 1.1 Page 92 of 207


1,948 16,200
1,360 11,300
2,613 21,700
976 8,100
1,238 10,200
1,910 15,800
3,077 25,500
976 8,100

1,375,200 11,412,700
1,252,960 10,398,300

1,910,000 15,851,000
1,528,000 12,680,800
2,750,400 22,825,400

2,521,200 20,923,300

2,930,291 24,318,400
2,302,375 19,107,300
384,139 3,187,900

288,104 2,391,000

1,152,418 9,563,800

710,658 5,897,800

336,122 2,789,500

249,690 2,072,200

23,928 198,600
15,693 130,200
10,375 86,100
11,170 92,700
11,964 99,300
12,759 105,900
1,360 11,300
1,345 11,100
1,146 9,500
1,375 11,400
-
669 5,500
478 4,000
287 2,400
191 1,500
96 800
573 4,700
478 4,000
382 3,200
287 2,400
143 1,200
143 1,200

ASSET LANCAR 1.1 Page 93 of 207


382 3,200
287 2,400
191 1,500
287 2,400
143 1,200
96 800
287 2,400
191 1,500
96 800
191 1,500
153 1,300
96 800
191 1,500
96 800
67 600
38 300
955 7,900
1,045 8,700
838 6,900
2,089 17,400

47,750 396,300
16,365 135,900
346,856 2,878,600

16,472 136,700
13,874 115,200
277,470 2,302,700

1,213,965 10,074,700

116,189 964,300

953,823 7,915,700

34,686 287,900
28,604 237,400
130,063 1,079,400

-
-
1,183 9,800
1,281 10,700
1,321 11,000
1,143 9,500
1,281 10,700
1,281 10,700
-
-
-
2,109 17,500
41,394 343,500

ASSET LANCAR 1.1 Page 94 of 207


46,084 382,500
10,345 85,800
30,071 249,600
4,370 36,300
657 5,500
2,109 17,500
41,394 343,500
46,100 382,600
10,329 85,700
32,974 273,700
4,370 36,300
657 5,500
2,109 17,500
2,017 16,700
46,084 382,500
10,329 85,700
30,071 249,600
4,370 36,300
657 5,500
2,109 17,500
2,017 16,700
46,100 382,600
10,329 85,700
30,071 249,600
4,370 36,300
657 5,500
2,109 17,500
1,772 14,700
46,100 382,600
10,329 85,700
20,857 173,100
4,370 36,300
657 5,500
2,093 17,400
1,772 14,700
59,684 495,300
10,329 85,700
23,776 197,300
642 5,300
2,109 17,500
1,772 14,700
59,668 495,200
10,345 85,800
23,776 197,300
642 5,300
2,109 17,500
2,017 16,700
44,465 369,100
11,643 96,600
45,107 374,300
4,370 36,300
642 5,300
2,109 17,500
3,239 26,800
96,295 799,200
4,676 38,800

ASSET LANCAR 1.1 Page 95 of 207


16,991 141,000
4,370 36,300
642 5,300
97,028 805,200
4,676 38,800
16,991 141,000
23,440 194,500
54,183 449,700
63,870 530,100
10,925 90,600
7,441 61,700
16,411 136,200
2,414 20,000
32,516 269,800
175,613 1,457,400

206,020 1,709,700

221,545 1,838,500

196,149 1,627,800

186,294 1,546,100

174,482 1,448,000

157,995 1,311,200

213,767 1,774,100

202,139 1,677,500

190,160 1,578,200

186,294 1,546,100

185,484 1,539,300

182,397 1,513,700

177,554 1,473,600

170,601 1,415,800

167,698 1,391,700

162,044 1,344,800

78,264 649,600

176,576 1,465,400

216,365 1,795,600

202,139 1,677,500

ASSET LANCAR 1.1 Page 96 of 207


197,112 1,635,800

187,256 1,554,100

163,649 1,358,100

154,267 1,280,300

168,493 1,398,300

139,843 1,160,500

158,637 1,316,500

148,460 1,232,100

141,661 1,175,700

126,289 1,048,100

141,982 1,178,300

132,279 1,097,800

125,311 1,039,900

185,484 1,539,300

203,912 1,692,200

297,700 2,470,600

192,436 1,597,000

206,020 1,709,700

178,211 1,479,000

178,211 1,479,000

151,196 1,254,800

177,706 1,474,800

151,028 1,253,300

150,370 1,248,000

121,125 1,005,200

94,919 787,700

79,563 660,300

87,004 722,000

ASSET LANCAR 1.1 Page 97 of 207


97,349 807,800

101,062 838,800

108,503 900,500

114,646 951,400

60,799 504,600

53,541 444,300

64,680 536,800

72,611 602,600

76,981 638,900

92,826 770,300

119,979 995,700
104,958 871,100

119,123 988,600

5,822 48,300
9,856 81,800

12,866 106,800
20,704 171,800
8,328 69,100
5,898 49,000
6,448 53,500
5,822 48,300
7,594 63,000
8,404 69,700
7,365 61,200
5,333 44,200
6,463 53,700
5,669 47,100
6,143 50,900
6,143 50,900
6,952 57,800
380,182 3,155,100
322,866 2,679,500
424,815 3,525,500
442,081 3,668,800
4,263 35,400
4,569 38,000
28,956 240,400
22,217 184,400
24,555 203,800
17,832 148,000
41,302 342,800
26,220 217,600
-

ASSET LANCAR 1.1 Page 98 of 207


69,300
69,300

55,400

1,663,200
415,800

415,800
415,800
623,700
346,500
346,500
1,871,100
1,386,000

795 6,600
504 4,200
795 6,600
1,910 15,800
2,628 21,800
458 3,900
550 4,600
168 1,400
1,864 15,500
1,192 9,900
1,115 9,200
749 6,200
1,177 9,800
2,903 24,100
22,187 184,100
6,738 55,900
3,025 25,100
5,226 43,300
1,818 15,100
1,039 8,600
2,582 21,500
1,467 12,200

3,117 25,900
2,827 23,400
2,368 19,700
4,385 36,400
4,385 36,400
7,319 60,700
7,319 60,700
2,964 24,600
15,280 126,800
15,280 126,800
2,964 24,600
11,109 92,200
6,341 52,600
19,818 164,500
2,078 17,300

ASSET LANCAR 1.1 Page 99 of 207


1,742 14,400
1,284 10,700
1,711 14,200
1,131 9,400
550 4,600
764 6,400
1,268 10,600
3,973 33,000
2,399 19,900
1,589 13,200
1,024 8,500
1,467 12,200
795 6,600
458 3,900
1,161 9,700
168 1,400
351 3,000
932 7,700
290 2,400
1,666 13,900
4,645 38,500
2,200 18,300
626 5,200
306 2,500
6,616 54,900
14,516 120,500
6,158 51,200
1,467 12,200
2,078 17,300
810 6,700
902 7,500
168 1,400
642 5,300
1,161 9,700
1,742 14,400
749 6,200
1,467 12,200
1,772 14,700
2,200 18,300
11,429 94,800
8,389 69,600
3,331 27,600
2,200 18,300
2,445 20,200
1,039 8,600
2,200 18,300
749 6,200
3,652 30,400
3,820 31,700
15,280 126,800
14,516 120,500
18,336 152,100
3,056 25,400
3,056 25,400
306 2,500
306 2,500

ASSET LANCAR 1.1 Page 100 of 207


8,404 69,700
19,864 164,900
18,336 152,100
14,516 120,500
917 7,600
917 7,600
764 6,400
1,070 8,900
2,292 19,000
-
-
6,143 50,900
6,143 50,900
8,878 73,700
2,964 24,600
5,654 47,000
5,898 49,000
3,942 32,700
5,333 44,200
2,964 24,600
2,964 24,600
749 6,200
474 4,000
168 1,400
336 2,800
1,818 15,100
947 7,800
4,126 34,200
3,010 25,000
11,704 97,100
10,238 84,900
2,903 24,100
-
-
8,220.64 68,200

2,964.32 24,600

7,089.92 58,900

7,716.40 64,000

26,342.72 218,600

30,850.32 256,100

18,229.04 151,300

13,904.80 115,400
10,573.76 87,800

458.40 3,900

14,638.24 121,400

ASSET LANCAR 1.1 Page 101 of 207


14,668.80 121,800

23,225.60 192,700

458.40 3,900

5,393.84 44,800
38,551.44 320,000

1,191.84 9,900

3,850.56 32,000

11,566.96 96,000

23,149.20 192,100

30,850.32 256,100

1,222.40 10,100
611.20 5,100
2,429.52 20,100
1,818.32 15,100
916.80 7,600

580.64 4,800

4,584.00 38,100
76,400.00 634,000
320.88 2,600
1,069.60 8,900
488.96 4,100
61.12 600
1,252.96 10,500
443.12 3,600
45.84 300
76.40 700
2,322.56 19,300
3,056.00 25,400
192,500
93,500
60,500
38,500
-
-
917 7,600
458 3,900
-
-
6,265 52,000
8,710 72,300
16,487 136,800
34,487 286,200
10,910 90,500

ASSET LANCAR 1.1 Page 102 of 207


17,878 148,400

32,974 273,700

14,210 117,900
17,190 142,700
29,842 247,600
14,867 123,400

23,226 192,700

38,200 317,000
33,616 279,000
38,842 322,300
35,419 293,900
22,187 184,100
23,226 192,700
28,910 239,900
30,316 251,600

27,290 226,500
16,136 133,900
16,136 133,900
13,187 109,500
44,587 370,000
16,136 133,900
16,136 133,900
35,068 291,100
27,290 226,500
34,838 289,100
29,964 248,700
42,158 349,900
28,329 235,100
117,289 973,400
12,423 103,100

27,519 228,400
16,258 135,000

18,412 152,800

23,776 197,300

20,995 174,200

14,684 121,900

143,601 1,191,700

ASSET LANCAR 1.1 Page 103 of 207


21,361 177,300

23,684 196,600

24,463 203,100

29,032 240,900

38,200 317,000

90,320 749,500
9,611 79,800

9,611 79,800

11,200 93,000

21,025 174,500
22,935 190,300

22,935 190,300

22,935 190,300

7,946 65,900

7,029 58,300

5,776 48,000

5,776 48,000

5,776 48,000

11,842 98,200

-
-
- -

ASSET LANCAR 1.1 Page 104 of 207


- -

- -

- -

245,900 2,040,600
312,300 2,592,000

79,000 655,400

12,100 100,100
12,100 100,100
2,200 18,500
4,400 36,600
5,600 46,200
1,000 8,100
1,500 12,400
4,600 38,100
31,600 262,200
37,200 308,400
25,300 210,200
323,500 2,685,000
411,000 3,410,700
522,600 4,336,900
411,000 3,410,700
102,200 848,100
-
-
5,348 44,300
900,000
650,000
360,000
900,000
900,000
-
-

1,314 -
1,772 14,700
993 8,300
1,314 9,500
2,812 20,200
825 5,900
50,302 362,100
15,280 110,000
4,844 34,900

749,927 5,657,800
870,654 5,698,000
382,351 2,884,700
955,795 7,211,000
338,162 2,551,300
499,931 3,771,700

ASSET LANCAR 1.1 Page 105 of 207


38,200 317,000
49,278 409,000
29,567 245,400
30,560 253,700
22,920 190,200
17,572 145,900
1,971 16,400
3,820 31,700
2,292 19,000
9,932 82,400
5,348 44,300
4,584 38,100
3,056 25,400
-
-
-
3514.4 29,200
3056 25,400
6112 50,700
3514.4 29,200
4927.8 40,900
3056 25,400
6112 50,700
6112 50,700
2750.4 22,900
4278.4 35,500
7640 63,400
76400 634,000
3350.904 27,800
8404 69,700
2292 19,000
5322.024 44,200
916.8 7,600
916.8 7,600
2597.6 21,600
2759.568 22,900
6188.4 51,400
2292 19,000
3820 31,700
3820 31,700
3350.904 27,800
11460 95,200
2750.4 22,900
2750.4 22,900

5348 44,300
27504 228,300
3820 31,700
3820 31,700
3056 25,400

764 6,400
11765.6 97,700
1833.6 15,200
9168 76,100
3820 31,700
7640 63,400

ASSET LANCAR 1.1 Page 106 of 207


9168 76,100
14638.24 121,400
45840 380,400
145160 1,204,700
34494.6 286,200
11460 95,200
42784 355,100
152800 1,268,100
9168 76,100
42020 348,700
216823.2 1,799,400
9168 76,100
9168 76,100
9168 76,100
9168 76,100

16,090 133,500
11,704 97,100
5,394 44,800
11,154 92,600
20,475 170,000
7,258 60,300
14,592 121,100
24,188 200,800
11,002 91,300
6,845 56,800
8,710 72,300

39,071 324,300

14,058 116,700
29,765 247,100
9,168 76,100
7,090 58,900
7,762 64,500
4,844 40,200
26,648 221,100
25,334 210,200
10,589 87,900
2,353 19,600
-
2,750 22,900
10,238 84,900
5,959 49,500
8,373 69,500
2,353 19,600
83,719 694,800

4,645 38,500

20,246 168,000
20,292 168,400
-
-
21,973 182,400
21,148 175,500
1,299 10,800

ASSET LANCAR 1.1 Page 107 of 207


2,139 17,700

26,419 219,200

73,100 606,700

14,241 118,100
186,003 1,543,600
180,411 1,497,200
117,182 972,500
101,444 841,800
581 4,800
1,528 12,700
9,168 76,100
26,255 217,900
32,819 272,400
3,938 32,700
5,470 45,400
79,860 662,800
5,754 47,700

2,319 19,300

744 6,200
2,713 22,600
3,085 25,600
7,658 63,600
2,319 19,300
21,836 181,200
24,986 207,400
10,415 86,500
2,319 19,300
2,713 22,600
12,318 102,200
2,079 17,300
5,185 43,000
5,185 43,000
7,658 63,600
1,904 15,800
3,807 31,600
2,319 19,300
40,477 335,900
678 5,600
3,807 31,600
4,682 38,800
15,928 132,200
75,637 627,700
23,280 193,200
6,564 54,500
7,789 64,700
1,675 13,900
1,971 16,400
7,786 64,600
7,786 64,600

ASSET LANCAR 1.1 Page 108 of 207


1,528 11,000
1,528 11,000
1,528 11,000
1,528 11,000
1,528 11,000
1,528 11,000
1,528 11,000
2,292 16,500
1,528 11,000
2,292 16,500
764 5,500
1,528 11,000
1,528 11,000
2,292 16,500
2,292 16,500
4,584 33,000
9,168 66,000
6,112 44,000
15,280 110,000
4,584 33,000
2,292 16,500
76,400 550,000
4,584 33,000
2,292 16,500
7,640 55,000
30,560 220,000
38,200 275,000
11,460 82,500
11,460 82,500
30,560 220,000
7,640 55,000
7,640 55,000
1,834 13,200
-
-
1,222 10,100
2,430 20,100
2,261 18,800
2,430 20,100
2,261 18,800
764 6,400
1,070 8,900
138 1,100
138 1,100
138 1,100
138 1,100
138 1,100
61,884 513,600
61,426 509,700
61,426 509,700
57,300 475,500
57,300 475,500
32,088 266,300
58,522 485,700

ASSET LANCAR 1.1 Page 109 of 207


57,758 479,400
29,032 240,900
24,448 202,800
27,504 228,300
4,908 40,700
4,908 40,700
4,908 40,700
4,908 40,700
857 7,200
591 5,000
-
-
-
12,800 34,166
15,500 49,188
16,400 78,405
21,900 95,753
23,700 116,849
22,800 137,836
26,500 201,999
43,800 238,289
113,200 308,628
129,600 451,437
144,200 603,374
739,916
45,600 62,941
31,000 42,195
40,200 54,210
60,200 74,200
104,000 130,000
-
-
838 7,214
1,155 9,947
1,587 13,663
2,386 20,550
2,729 23,501
3,491 30,059
5,103 43,941
6,880 59,244
11,412 98,267
12,668 105,200
15,740 135,540
17,771 153,030
6,785 59,244
10,495 98,267
-
-
10,696 1,089,650
27,504 1,573,950
3,820 9,800

ASSET LANCAR 1.1 Page 110 of 207


HARGA SATUAN SEWA PERALATAN PER JAM

UMU BIAYA KEPEMILIKAN (Rp) BIAYA OPERASI (Rp)


TENAG TOTAL
R UMUR BIAYA
NO JENIS PERALATAN KODE A KAPASITAS HARGA ALAT ALAT CRF KERJA BIAYA TOTAL BIAYA
OPERASIONA PERJAM
ALAT ALAT ALAT Cp (Rp ) Asuransi dan PEMILIKAN Bensin (Rp)
HP (Tahu (JAM) Deperiasi 90% Pajak 3,3% x (Rp)
Solar Oli 0,167 x Sperpat L
n) x5x7 /8 5/8 0,158 x 3 0,006 x 3 3 60% x 9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 ASPHALT MIXING PLANT E155 150 30.00 T/Jam 4,601,634,400 10 0.163 1,200 561,687.00 126,544.95 ### 3,827,267.40 58,894.20 - 337,012.20 ### 4,911,405.75
2 ASPHALT FINISHER E157 30 6.00 Ton 910,935,900 7 0.205 1,200 140,336.51 25,050.74 ### 65,800.68 11,778.84 - 84,201.91 161,781.43 327,168.68
3 ASPHALT SPRAYER E154 6 800.00 Liter 131,474,800 6 0.23 750 36,225.51 5,784.89 42,010.40 13,160.14 2,355.77 - 21,735.31 37,251.22 79,261.62
4 BULDOZER 100 - 150 HP E001 110 - 2,693,150,400 8 0.187 1,200 378,603.08 74,061.64 ### 241,269.16 43,189.08 - 227,161.85 511,620.09 964,284.81
5 COMPRESSOR 210 m3/h E301 35 - 7,998,900 8 0.187 750 1,799.18 351.95 2,151.13 76,767.46 13,741.98 - 1,079.51 91,588.95 93,740.08
6 CONCRETE MIXER 0,3 - 0,6 E252 20 500.00 Liter 18,782,100 5 0.264 1,500 2,972.83 413.21 3,386.04 43,867.12 7,852.56 - 1,783.70 53,503.38 56,889.42
7 CRANE 10 - 15 TON E225 148 15.00 Ton 469,553,100 6 0.23 1,500 64,688.45 10,330.17 75,018.62 324,616.69 58,108.94 - 38,813.07 421,538.70 496,557.32
8 DUMP TRUCK 3,5 Ton E211 115 3.50 Ton 478,484,000 6 0.23 1,300 76,060.18 12,146.13 88,206.31 252,235.94 45,152.22 - 45,636.11 343,024.27 431,230.58
9 DUMP TRUCK 5 Ton E212 145 5.00 Ton 580,897,000 6 0.23 1,300 92,339.83 14,745.85 ### 318,036.62 56,931.06 - 55,403.90 430,371.58 537,457.26
10 MINI TRUCK 1 Ton E213 74 1.00 Ton 78,000,000 6 0.23 1,300 12,398.94 1,980.00 14,378.94 162,308.34 29,054.47 - 7,439.36 198,802.17 213,181.11
11 EXCAVATOR 80 - 140 HP E020 90 0.50 M3 2,078,719,000 8 0.187 1,500 233,781.05 45,731.82 ### 197,402.04 35,336.52 - 140,268.63 373,007.19 652,520.06
12 FLAT BED TRUCK 3 - 4 M3 E221 115 4.00 M3 693,895,000 6 0.23 1,300 110,302.08 17,614.26 ### 252,235.94 45,152.22 - 66,181.25 363,569.41 491,485.75
13 GENERATOR SET E311 10 125.00 KVA 187,823,300 8 0.187 600 52,808.40 10,330.28 63,138.68 - 3,926.28 ### 31,685.04 56,513.04 119,651.72
14 MOTOR GRADER > 100 HP E010 100 - 2,693,978,900 8 0.187 1,500 302,975.64 59,267.54 ### 219,335.60 39,262.80 - 181,785.38 440,383.78 802,626.96
15 TRACK LOADER 75 - 100 HP E051 135 1.60 M3 835,807,600 8 0.187 1,500 93,998.27 18,387.77 ### 296,103.06 53,004.78 - 56,398.96 405,506.80 517,892.84
16 WHEEL LOADER 1.0 -1.6 M3 E052 115 1.50 M3 1,990,858,300 8 0.187 1,500 223,899.89 43,798.88 ### 252,235.94 45,152.22 - 134,339.93 431,728.09 699,426.86
17 THREE WHEEL ROLLER 6 - 8 T E080 37 8.00 Ton 796,343,300 10 0.163 1,500 77,762.92 17,519.55 95,282.47 81,154.17 14,527.24 - 46,657.75 142,339.16 237,621.63
18 TANDEM ROLLER 6 - 8 T E081 40 8.00 Ton 753,104,700 10 0.163 1,500 73,540.67 16,568.30 90,108.97 87,734.24 15,705.12 - 44,124.40 147,563.76 237,672.73
19 TIRE ROLLER 8 - 10 T E084 95 10.00 Ton 1,356,637,800 10 0.163 1,500 132,475.68 29,846.03 ### 208,368.82 37,299.66 - 79,485.41 325,153.89 487,475.60
20 VIBRATORY ROLLER 5 - 8 T E082 51 7.00 Ton 1,356,637,800 8 0.187 1,500 152,572.91 29,846.03 ### 111,861.16 20,024.03 - 91,543.75 223,428.94 405,847.88
21 CONCRETE VIBRATOR E089 4 - 5,634,700 5 0.264 600 2,229.65 309.91 2,539.56 - 1,570.51 8,360.69 1,337.79 11,268.99 13,808.55
22 STONE CRUSHER E031 185 30.00 T/Jam 2,817,326,800 10 0.163 1,500 275,111.96 61,981.19 ### 405,770.86 72,636.18 - 165,067.18 643,474.22 980,567.37
23 WATER PUMP 70 - 100 mm E341 8 - 5,634,700 4 0.315 750 2,133.09 247.93 2,381.02 17,546.85 3,141.02 ### 1,279.85 38,689.10 41,070.12
24 WATER TANKER 3000 - 4500 L E182 115 4,000.00 Liter 236,656,300 8 0.187 700 57,032.82 11,156.65 68,189.47 252,235.94 45,152.22 - 34,219.69 331,607.85 399,797.32
25 PEDESTERIAL ROLLER E087 12 1.00 Ton 138,527,500 6 0.23 750 38,168.76 6,095.21 44,263.97 - 4,711.54 ### 22,901.26 52,694.86 96,958.83
26 TAMPER E088 4 0.20 Ton 12,390,900 6 0.23 750 3,414.09 545.20 3,959.29 - 1,570.51 8,360.69 2,048.45 11,979.65 15,938.94
28 FULVI MIXER E27 75 - 86,399,600 10 0.163 750 16,873.84 3,801.58 20,675.42 164,501.70 29,447.10 - 10,124.30 204,073.10 224,748.52
29 CONCRETE PUMP E28 100 8.00 M3 211,300,700 10 0.163 750 41,267.03 9,297.23 50,564.26 219,335.60 39,262.80 - 24,760.22 283,358.62 333,922.88
30 TRAILER 20 TON E29 175 10.00 Ton 657,377,300 10 0.163 750 128,385.79 28,924.60 ### 383,837.30 68,709.90 - 77,031.47 529,578.67 686,889.06
31 PILE DRIVER E30 25 2.50 Ton 131,474,800 10 0.163 750 25,677.03 5,784.89 31,461.92 54,833.90 9,815.70 - 15,406.22 80,055.82 111,517.74
32 CRANE ON TRACK 35 TON E31 125 35.00 Ton 657,377,300 10 0.163 750 128,385.79 28,924.60 ### 274,169.50 49,078.50 - 77,031.47 400,279.47 557,589.86
33 WELDING SET E32 40 250.00 Amp 32,870,800 10 0.163 750 6,419.67 1,446.32 7,865.99 87,734.24 15,705.12 - 3,851.80 107,291.16 115,157.15
34 BORE PILE MACHINE E33 150 2,000.00 Meter 4,225,990,300 10 0.163 750 825,335.91 185,943.57 ### 329,003.40 58,894.20 - 495,201.55 883,099.15 1,894,378.63
35 VIBRATORY ROLLER 1 T E087 12 1.00 Ton 147,928,300 6 0.23 1,200 25,474.36 4,068.03 29,542.39 26,320.27 4,711.54 - 15,284.62 46,316.43 75,858.82
HARGA SATUAN UPAH TENAGA KERJA

KODE UPAH
NO URAIAN
ANALISA (Rp./Org/Hr)

1 2 3 4

1 L 01 Pekerja 95,000
2 L 061 Mandor 150,000
3 L 073 Kepala Tukang 150,000
4 L 079 Tukang 130,500
5 L 081 Operator - Terlatih 166,700
6 L 082 Operator - Semi Terlatih 96,000
7 L 091 Sopir - Terlatih 138,900
8 L 101 Buruh Tak Terlatih 95,000
9 L 103 Buruh Semi Terlatih 105,000
10 L 106 Buruh Terlatih 136,000
11 L 083 Pembantu Operator 110,000
12 L 071 Mekanik 166,600
13 L 099 Pembantu Supir 110,000
Desa Hanopan Dusun Purba Sinomba
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA HARGA SATUAN KODE
SUB DIT. PERENC. JALAN LOKAL & ONGKOS ANGKUT TRUCK PERHARI K 013 b
KABUPATEN (Menggunakan Alat)
Propinsi Kode Kabupaten Kode Disiapkan Oleh Tanggal
Sumatera Utara 12 Tapanuli Selatan 02 - -

PROSES : ANGGAPAN :
1. Dumptruk mengangkut Material ke Lokasi Tujuan

Total Vol Upah Biaya Sub Total


Pekerja Vol Hari Kode
(org.hari ) (Rp./Org/Hr) (Rp.) (Rp.)

P Supir Terlatih 1.00 1.00 L 091 1.00 138,900.00 138,900.00


E Pembantu Supir 1.00 1.00 L 099 1.00 110,000.00 110,000.00
K
E
R
J
A

Pekerja 248,900.00
Volume H. Satuan Biaya Sub Total
Material Kode Total Vol
Satuan (Rp.) (Rp.) (Rp.)

M
A
T
E
R
I
A
L
Material -
Jumlah Hari Jam Harga Biaya Sub Total
Peralatan Kode
Kerja Kerja (Rp./Jam) (Rp.) (Rp.)
P
E Dump truk (3,5 t) / 115 HP 1 1 E 211 6 431,230.58 2,587,383.48
R
A
L
A
T
A
N
Peralatan 2,587,383.48
TOTAL (Rp.) 2,836,283.48

VOLUME : 1 Hari HARGA SATUAN Rp. 2,836,300.00


diambil 80% 2,269,040.00

Desa Hanopan Dusun Purba Sinomba


DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA HARGA SATUAN KODE
SUB DIT. PERENC. JALAN LOKAL & ONGKOS ANGKUT DT- 5 ton PERHARI K 013 c
KABUPATEN (Menggunakan Alat)
Propinsi Kode Kabupaten Kode Disiapkan Oleh Tanggal
Sumatera Utara 12 Tapanuli Selatan 02 - -

PROSES : ANGGAPAN :
1. Dumptruk mengangkut Material ke Lokasi Tujuan
DAFTAR HARGA BAHAN BANGUNAN

#REF! : #NAME?
#REF! : #NAME?
#REF! : #NAME?
#REF! : #NAME?
#REF! : #NAME?
#REF! : #NAME?

NO NAMA BAHAN SATUAN H. SATUAN (Rp)


1 2 3 4

1 Batu Kali m3 168,612


2 Batu Gunung m3 241,100
3 Batu belah m3 126,900
4 Batu Pecah 5/7 m3 299,300
5 Batu Pecah 2/3 (Stone Crusher) m3 485,800
6 Kerikil sungai royalty m3 203,100
7 Koral Beton 2/3 m3 190,400
8 Sirtu royalty m3 168,600
9 Pasir Beton m3 168,600
10 Pasir Pasang m3 203,100
11 Pasir Urug m3 154,200
12 Tanah Urug m3 115,700
13 Tanah Timbunan pilihan m3 117,800
14 Batu Alam m2 443,000
15 Batu Bata bh 900
16 Batu andesit bakar m2 298,500
17 Air ltr 38
18 Bak cuci piring Stainless Steel (1 bak) bh 499,200
19 Bak cuci piring Stainless Steel (2 bak) bh 801,200
20 Bak Fibreglass (bungkus keramik) bh 614,200
21 Besi Beton kg 25,300
22 Besi Strip kg 32,600
23 Besi Hollow 30x30 mm m' 32,300
24 Besi Hollow 30x60 mm m' 44,900
25 Besi Siku 40x40x4 mm kg 31,978
26 Suspension Rop Clip 3 mm m' 5,200
27 Mur + Ring bh 1,400
28 Cat untuk kayu/Besi kg 59,200
29 Cat Dasar kg 20,900
30 Cat Tembok kg 23,746
31 Cat Tembok (setara Dulux) kg 150,000
32 Cat Tembok (setara Danabrite) kg 35,400
33 Calci Board 1200x2400x10 mm lbr 308,695
34 Calci Board 1200x2400x12 mm lbr 466,964
35 Soda Api kg 28,800
36 Floor Drain TOTO bh 298,963
37 Gypsum Board 120x240x0,9 cm lbr 137,400
38 Rangka Furing Btg 51,800
39 Y. Engel (gantungan furing) Btg 43,900
40 Kaca Nako m2 263,500
41 Profil kaca 5 mm m2 278,500
42 Kaca Cermin m2 199,500
43 Kaca Polos 5 mm m2 244,700
44 Kaca Rayben 5 mm m2 315,037
45 Kaca Rayben 8 mm m2 1,029,533
46 Kawat Beton kg 25,000
47 Kayu Keras kelas II m3 8,235,034
48 Kayu Kelas III m3 6,255,651
49 Kayu Kelas IV m3 4,326,826
50 Kayu Bulat dia. 8-10/400 Cm btg 227,300
1 2 3 4

51 Papan rider m 36,800


52 Kloset Duduk + Tangki TOTO bh 3,236,400
53 Kloset Jongkok automatic TOTO bh 3,238,606
54 Kloset Jongkok biasa bh 443,000
55 Daun UPVC m2 750,678
56 Bingkai UPVC m 254,918
57 Kosen UPVC m 449,877
58 Kran Air TOTO bh 184,361
59 Kran Air Paruh Angsa bh 253,100
60 Kunci tanam antik bh 334,300
61 Kunci Tanam 6" bh 151,500
62 Kunci tanam biasa 9" bh 180,500
63 Lem Kayu ltr 57,000
64 List Kayu Profil m' 6,900
65 List Profil Gypsum m' 24,800
66 Markis Seng Genteng m' 46,700
67 Minyak Bekisting ltr 15,800
68 Paku Atap kg 49,600
69 Paku Biasa kg 23,900
70 Paku Ulir (seng genteng) kg 40,700
71 Paku Skrup 3,5" kg 40,700
72 Perekat kg 57,000
73 Pintu Fibre Plastik KM/WC Set 443,000
74 Pipa Galvanis Putih 1,50" m' 102,400
75 Pipa PVC 3/4" m' 8,700
76 Pipa PVC 3" m' 51,900
77 Pipa PVC 4" m' 86,100
78 Plamur Tembok kg 49,100
79 Triplek 4 mm lbr 104,500
80 Triplek 6 mm lbr 178,000
81 Triplek 9 mm lbr 247,400
82 Rangka aluminium m 69,500
83 Rangka Baja Ringan untuk Seng m2 286,900
84 Rangka Baja Ringan untuk Genteng m2 296,900
85 Rabung Seng m' 27,200
86 Rabung Zincalume tipe A 770 m' 36,800
87 Rabung Genteng Seng 0,80 cm m' 81,600
88 Rabung Genteng Seng Tektur Pasir m' 139,605
89 Semen PC Warna kg 4,100
90 Semen Porland kg 2,000
91 Seng Genteng 0,80 x 1,05 (tekstur pasir) lbr 189,600
92 Seng Genteng 0,75 x 1,2 (4 susun) tebal 0,3 mm lbr 125,602
93 Zincalume tipe A 770 (warna) m2 93,000
94 Seng Gelombang 7 kk, 11 parit lbr 92,600
95 Seng Plat lbr 20,700
96 Seng Plat 3'x6' BJLS 28 lbr 109,000
97 Talang Seng Plat m' 46,700
98 Talang Plastik m' 33,600
99 Sambungan Talang Plastik bh 19,500
100 Gantungan Talang Plastik bh 8,723
101 Urinoir Keramik Standar bh 2,204,200
102 Keramik 20x20 cm (kw.I) bh 3,800
103 Keramik 20x25 cm (kw. I) bh 5,800
104 Keramik 25x25 cm (kw. I) bh 5,773
105 Keramik 30x30 cm (kw.I) bh 7,900
106 Keramik 25x40 cm (kw. I) bh 11,110
107 Keramik 40x40 cm (kw. I) bh 17,300
108 Keramik 60x60 cm (kw. I) bh 64,500
109 Granito 60x60 cm m2 64,500
110 Step Nosing 7,5x30 cm bh 2,600
1 2 3 4

111 Venetions Blinds m2 331,600


112 Wastafel TOTO bh 1,858,555
113 Water Drain + Asesories set 143,700
114 Pipa GSP ø 20 mm M' 32,300
115 Pipa GSP ø 25 mm M' 58,900
116 GLV ø 40 mm Bh 462,600
117 GLV ø 65 mm Bh 860,700
118 FCO (Floor Clean Out) ø 100 mm M' 177,200
119 Seal Tape Bh 7,190
120 Hangger / support Pcs 3,595
121 Sealant Tube 60,000
122 Lem PVC Tube 12,600
123 Kabel NYY 4x10 mm M' 1,944
124 Kabel NYM 3x2,5 Putih (50 m) M' 16,941
125 Panel P-1 Bh 16,460,000
126 Lampu TL 1x40 W Bh 284,800
127 Lampu TL 2x40 W Bh 572,700
128 Lampu PLC 20 W Bh 44,300
129 Lampu PLC 40 W Bh 75,900
130 Lampu Downlight 10 W Bh 329,100
131 Saklar tunggal Bh 30,505
132 Saklar ganda Bh 49,792
133 Saklar triple Bh 78,232
134 Pipa Flexible Listrik (30 m) M' 3,542
135 Kotak Kontak 1 fase, 15A, 250V Bh 73,418
136 Concrete Vinrator Jam 27,344
137 Torent air, 1000L, Excel Plastik Unit 1,000,000
138 Pompa Air Unit 400,000
139 Paving Block (tipe tapak kuda bh 5,320
140 Gorong-Gorong ø 20 Cm M' 86,403
DAFTAR PERHITUNGAN HARGA MATERIAL

ANGKUT DENGAN DUMP TRUCK HARGA


ANGKUT DENGAN MINI TRUCK 1 TON
MATERIAL
SUMBER MATERIAL JENIS
No. JENIS MATERIAL JARAK HITUNG DGN TRUCK JARAK HARGA BIAYA DILOKASI
(QUARRY) KENDARAAN WAKTU/TR JLH BIAYA ANGKUT BIAYA
KELOKASI PEKERJAAN (KM) DARI MATERIAL DI BONGKAR JRK ANGKUT PROYEK
IP (JAM) TRIP (Rp/m3) ANGKUT+BONG
QUARRY QUARRY (Rp/m3) (Rp/m3) TRUCK 1 TON JLH TRIP (Rp/m3)
KAR+MUAT
AB AP T/S TH (Km)
(Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A. TIMBUNAN
1 Sirtu DT 5 TON 11.00 - - - 11.00 1.26 5.0 185,500.00 177,848.00 32,106.00 - - - 395,454.00
2 Pasir urug DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 169,600.00 207,455.00 32,106.00 - - - 409,161.00
3 Timbunan pilihan Setempat DT 5,0 TON - - - 1.00 1.00 0.50 12.0 129,600.00 74,103.00 - - - - 203,703.00

B AGREGAT UNTUK COR BETON


1 Pasir ayak beton ( dilokasi kerja ) DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 185,500.00 207,455.00 - - - - 392,955.00
2 Batu Pecah Tersaring (K 017) di lokasi kerja Stone Crusher DT 5,0 TON 90.00 - - - 100.00 5.95 1.0 534,400.00 889,242.00 - - - - 1,423,642.00
( Jarak Hitung Angkut dikurangi 10 Km )
3 Sirtu DT 5 TON 11.00 - - - 11.00 1.26 5.0 185,500.00 177,848.00 32,106.00 - - - 395,454.00

C AGREGAT UNTUK PASANGAN BATU


1 Pasir Pasangan DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 223,400.00 207,455.00 32,106.00 - - - 462,961.00
2 Batu kali DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 185,500.00 207,455.00 32,106.00 - - - 425,061.00
3 Batu gunung Setempat DT 3,5 TON - - - - - - - 139,600.00 - 32,106.00 - - - 171,706.00

D AGREGAT UNTUK TELFORD DAN LAPEN


D.1 TELFORD
1 Batu sungai belah 10-15 DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 265,200.00 207,455.00 32,106.00 - - - 504,761.00
2 Batu Sungai Belah 5 - 7 manual DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 329,200.00 207,455.00 32,106.00 - - - 568,761.00
3 Batu gunung belah 10-15 Setempat DT 3,5 TON - - - - - - - 139,600.00 - 32,106.00 - - - 171,706.00
4 Batu Gunung Belah 5 - 7 manual Setempat DT 3,5 TON - - - - - - - 139,600.00 - 32,106.00 - - - 171,706.00
D.2 LAPEN
1 Batu pecah 3 - 5 manual DT 3,5 TON 11.00 - - - 11.00 1.26 5.0 388,700.00 207,455.00 32,106.00 - - - 628,261.00
2 Batu pecah 2 - 3 Stone Cruisher Stone Crusher DT 5,0 TON 90.00 - - - 100.00 5.95 1.0 534,400.00 1,037,275.00 - - - - 1,571,675.00
( Jarak Hitung Angkut dikurangi 10 Km )
3 Batu pecah 1 - 2 Stone Cruisher Stone Crusher DT 5,0 TON 90.00 - - - 100.00 5.95 1.0 592,600.00 1,037,275.00 - - - - 1,629,875.00
( Jarak Hitung Angkut dikurangi 10 Km )
4 Batu pecah 0,5 - 1 (Mata Ayam Stone Scrusher) Stone Crusher DT 5,0 TON 90.00 - - - 100.00 5.95 1.0 595,900.00 889,242.00 - - - - 1,485,142.00
( Jarak Hitung Angkut dikurangi 10 Km )

E AGREGAT UNTUK HOTMIX


E.1 AGREGAT DASAR DI STONE CRUSHER/AMP
1 Pasir ayak beton (untuk AMP) Stone Crusher DT 5,0 TON - - - - - - - - - - - - -
2 Batu Pecah Tersaring (K.017.a untuk di lokasi AMP, tanpa Stone Crusher DT 5,0 TON - - - - - - - - - - - - -
mengangkut hasil)
E.2 AGREGAT BASE UNTUK HOTMIX
1 Material Base C ( kerikil sungai tidak tersaring ) di lokasi kerja DT 5 TON - - - - - - - 261,000.00 - - - - - 261,000.00
( Jarak Hitung Angkut dikurangi 10 Km )
2 Base-A (Batu Pecah Tersaring (K.017))di lokasi kerja Stone Crusher DT 5,0 TON 90.00 - - - 100.00 5.95 1.0 534,400.00 889,242.00 - - - - 1,423,642.00
( Jarak Hitung Angkut dikurangi 10 Km )
E.3 AGREGAT UNTUK AC-BC dan AC-WC
1 Laston / AC Ton AMP DT 5,0 TON 90.00 - - - 100.00 5.95 1.0 555,776.00 - - - - 555,776.00
( Jarak Hitung Angkut dikurangi 10 Km )

F SEMEN, ASPHALT DAN BESI


1 Semen TOKO DT 3,5 TON 70.00 - - - 70.00 5.33 1.0 2,200.00 648.30 100.00 - - - 2,948.30

Keterangan
AB = Aspal Beton KOLO FORMULASI
AP = Aspal Penetrasi 8 Waktu Trip = AB/35+AP/30+T/S/25+TH/20+AB/30+AP/25+TS/20+TH/15+WM/WB
T/S = Telford/Sirtu 9 Jumlah Trip = 6 / Waktu/Trip
TH = Tanah 11 Biaya Angkut = Rp 2,269,040 Dump truk 3,5 ton
Jlh. Trip x 3,5/1,6
Biaya Angkut = Rp 2,778,880 Dump truk 5,0 ton
Jlh. Trip x 5,0/1,6
Biaya Angkut = Rp 1,222,400 Mini truk 1,0 ton
Jlh. Trip x 1,0/1,6
3. HSPK SALURAN IRIGASI DAN BRONJONG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)
1 m3 Galian tanah biasa sedalam < 1 m
Tenaga Kerja
Pekerja 0.5630 OH 95,000.00 53,485.00
Mandor 0.0563 OH 150,000.00 8,445.00
Jumlah Harga Tenaga Kerja 61,930.00
Bahan
Jumlah Harga Bahan -
Peralatan
Jumlah Harga Peralatan -
Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 61,930.00
Overhead + Profit (Contoh 15%) xD -
Nilai HSPK : 61,930.00

Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP) / Manual
Tenaga Kerja
Pekerja 2.700 OH 95,000.00 256,500.00
Tukang batu 0.900 OH 130,500.00 117,450.00
Mandor 0.270 OH 150,000.00 40,500.00
Jumlah Harga Tenaga Kerja 414,450.00
Bahan
Batu kali 1.200 m3 265,200.00 318,240.00
Pasir Pasang 0.520 m3
223,400.00 116,168.00
Portland Cement 163.000 kg 2,200.00 358,600.00
Jumlah Harga Bahan 793,008.00
Peralatan

Jumlah Harga Peralatan -


Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,207,458.00
Overhead + Profit (Contoh 15%) xD -
Nilai HSPK : 1,207,458.00
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
Tenaga Kerja
Pekerja 0.384 OH 95,000.00 36,480.00
Tukang batu 0.192 OH 130,500.00 25,056.00
Kepala Tukang 0.019 OH 150,000.00 2,850.00
Mandor 0.019 OH 150,000.00 2,850.00
Jumlah Harga Tenaga Kerja 67,236.00
Bahan
Pasir Pasang 0.030 m3 223,400.00 6,702.00
Portland Cement 7.776 kg 2,200.00 17,107.20
Jumlah Harga Bahan 23,809.20
Peralatan
Jumlah Harga Peralatan -
Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 91,045.20
Overhead + Profit (Contoh 15%) xD -
Nilai HSPK : 91,045.20
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)
1 m3 Pasangan Bronjong Kawat pabrikasi
(Tenaga kerja untuk 1 m3 volume batu bronjong)

Tenaga Kerja *)
Pekerja (isian batu dan pemasangan) 0.250 OH 95,000.00 23,750.00
Mandor 0.025 OH 150,000.00 3,750.00
Jumlah Harga Tenaga Kerja 27,500.00
Bahan
Batu 1.3 m3 265,200.00 344,760.00
Kawat Bronjong 1.00 bh 819,200.00 819,200.00
Jumlah Harga Bahan 1,163,960.00
Peralatan
Jumlah Harga Peralatan -
Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,191,460.00
Overhead + Profit (Contoh 15%) xD -
Nilai HSPK : 1,191,460.00
*) Koefisien ini untuk volume bronjong 1 m3, misal volume 2m3 maka koefisien harus dikalikan 2
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
PEKERJAAN PERSIAPAN
Pengukuran 1 M' dan Pemasangan Bowplank
Bahan
Balok Kayu klas III m3 6,255,651 75,068
Papan klas III m3 6,255,651 43,790
Paku 5-7" kg 23,900 478
Jumlah 119,336
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pagar Sementara 1 m' dari Seng tinggi 2 meter
Bahan
Dolken kayu ø 8-10/400 m btg 227,300.00 284,125.00
Semen portland Kg 2,000.00 5,000.00
Seng gelombang lbr 92,600.00 111,120.00
Pasir beton m3 168,600.00 843.00
Koral beton m3 190,400.00 1,714.00
Paku 2-5" kg 23,900.00 478.00
Jumlah 403,280.00
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pembuatan 1 m2 Kantor Sementara Lantai Plesteran
Bahan
Dolken kayu ø 8-10/400 m btg 227,300 284,125
Kayu m3 4,326,826 778,829
Paku biasa kg 23,900 1,912
Besi strip kg 32,600 35,860
Semen portland kg 2,000 70,000
Pasir pasang m3 203,100 30,465
Pasir beton m3 168,600 16,860
Koral beton m3 190,400 28,560
Bata merah bh 900 27,000
Seng plat lbr 20,700 5,175
Jendela nako bh 263,500 52,700
Kaca polos m2 244,700 19,576
Kunci tanam bh 151,500 22,725
Plywood 4 mm lbr 104,500 6,270
Jumlah 1,380,057
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Pembuatan 1 m2 Gudang Semen dan Peralatan
Bahan
Dolken kayu ø 8-10/400 m btg 227,300 386,410
Kayu m3 4,326,826 908,633
Paku biasa kg 23,900 7,170
Semen portland kg 2,000 21,000
Pasir beton m3 168,600 5,058
Koral beton m3 190,400 9,520
Seng gelombang lbr 92,600 138,900
Seng plat lbr 20,700 5,175
Jumlah 1,481,866
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pembersihan 1 M2 dan Perataan Lokasi Pekerjaan
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Nilai HSPK #REF!
Papan Nama Proyek
Bahan/Upah
Papan nama proyek + Tiang pondasi Unit 750,000 750,000
Nilai HSPK 750,000
Pengadaan Sumber Air Bersih
Bahan
Torent air, 1000L, Excel Plastik Unit 1,000,000 1,000,000
Instalasi pipa & aksesoris Ls 2,750,000 2,750,000
Pompa air Unit 400,000 400,000
Nilai HSPK 4,150,000
Pengadaan Listrik Kerja
Bahan
Biaya Penyambungan PLN Ls 1,700,000 1,700,000
Listrik PLN utk Pekerjaan Proyek Ls 1,500,000 7,500,000
Nilai HSPK 9,200,000
Keamanan Proyek
Upah
Petugas siang hari Bln 1,750,000 1,750,000
Petugas malam hari Bln 1,600,000 1,600,000
Nilai HSPK 3,350,000
Mobilisasi Alat Pancang
Upah
Mesin alat pancang PP 20,000,000 40,000,000
Nilai HSPK 40,000,000
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Peralatan Keselamatan dan Kesehatan Kerja (K3)
Bahan
Pemadam kebakaran & Ambulance Ls - -
Sabuk pengaman Set 100,000 500,000
Rambu-rambu, railing Ls - -
P3K Ls 1,000,000 2,000,000
Helm Proyek Ls 100,000 1,500,000
Mantel Ls 280,000 2,240,000
Nilai HSPK 6,240,000
Dokumentasi
Bahan
Test tekan beton Bh 125,000 12,500,000
Test PDA Ttk 4,500,000 18,000,000
Laporan dan foto dokumen Set 500,000 2,500,000
Nilai HSPK 33,000,000
PEKERJAAN TANAH
Menggali 1 m3 tanah biasa sedalam 1 meter
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Nilai HSPK #REF!
Menggali 1 m3 tanah biasa sedalam 2 meter
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Nilai HSPK #REF!
Mengurug kembali 1 m3 galian
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Nilai HSPK #REF!
Mengurug 1 m3 pasir urug
Bahan
Pasir Urug m3 154,200 185,040
Jumlah 185,040
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Mengurug 1 m3 tanah timbunan
Bahan
Tanah timbunan m3 117,800 141,360
Jumlah 141,360
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Mengurug 1 m3 tanah timbunan
Alat
Alat bantu Set 25,000 25,000
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Nilai HSPK #REF!
Membentuk dengan Galian Tanah 1 m3 dengan Alat Berat
Bahan
Alat bantu (@ 3 alat) set 157,700 158
Jumlah 158
Alat Berat
Bulldozer 110 HP Jam 881,000 13,215
Excavator 80-140 HP Jam 651,700 16,293
Jumlah 29,508
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membentuk dengan Galian Tanah 1 m3 dengan Alat Berat
Bahan
Alat bantu (@ 3 alat) set 160,000 160
Alat Berat
Excavator 80-140 HP Jam 665,000 16,625
Tenaga Kerja
Pekerja OH 92,500 2,313
Mandor OH 150,000 750
Nilai HSPK 19,848
Pemadatan Tanah 1 m2 dengan Alat Berat
Bahan
Alat bantu (@ 3 alat) set 157,700 158
Jumlah 158
Alat Berat
Dump Truck Jam 558,600 13,965
Vibratory Roller 5-8 T Jam 421,400 843
Bulldozer 110 HP Jam 881,000 22,025
Jumlah 36,833
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
PEKERJAAN PONDASI
Memasang 1 m3 pondasi batu kali, campuran 1 PC : 3 PP
Bahan
Batu kali m3 168,612 202,334
PC kg 2,000 404,000
PP m3 203,100 98,504
Jumlah 704,838
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m3 pondasi batu kali, campuran 1 PC : 4 PP
Bahan
Batu kali m3 168,612 202,334
PC kg 2,000 326,000
PP m3 203,100 105,612
Jumlah 633,946
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Potong Kepala Pancang
Upah
Pemotongan kepala tiang pancang Bh 85,000 85,000
Buang Potongan kepala tiang pancang Bh 15,000 15,000
Nilai HSPK 100,000
Pemancangan 1 Btg 25x25 cm P. 12 m
Bahan
Pengadaan Tiang Pancang M' 351,000 4,212,000
Alat
Pemancangan Hydraulic Hammer M' 145,000 1,740,000
Las Sambungan Ttk 50,000 50,000
Nilai HSPK 6,002,000
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
PEKERJAAN DINDING
Memasang 1 m2 dinding batu merah ukuran (5x11x22) cm tebal 1 bata, campuran 1 PC : 4 PP
Bahan
Batu merah bh 900 126,000
PC kg 2,000 53,100
PP m3 203,100 18,888
Jumlah 197,988
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 dinding batu merah ukuran (5x11x22) cm tebal 1/2 bata, campuran 1 PC : 4 PP
Bahan
Batu merah bh 900 63,000
PC kg 2,000 23,000
PP m3 203,100 8,733
Jumlah 94,733
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Batu Alam
Bahan
Batu alam m2 443,000 465,150
PC kg 2,000 23,498
PP m3 203,100 7,109
Jumlah 495,757
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN PLESTERAN
Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Bahan
PC kg 2,000 20,448
PP m3 203,100 4,062
Jumlah 24,510
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Bahan
PC kg 2,000 12,480
PP m3 203,100 4,874
Jumlah 17,354
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 acian
Bahan
PC kg 2,000 6,500
Jumlah 6,500
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m Relief Dinding
Bahan
PC kg 2,000 19,200
Jumlah 19,200
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN BETON
Membuat 1 m3 beton mutu f'_x001E_uc_x001F_=7,4 MPa (K 100), slump (12_x001E__x001E__+_x001F__x001F_2) cm,
Bahan
PC kg 2,000 494,000
PB kg 120 104,652
KR (maksimum 30 mm) kg 150 150,294
Air ltr 38 8,170
Jumlah 757,116
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Membuat 1 m3 lantai kerja beton mutu f'_x001E_uc_x001F_=7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Bahan
PC kg 2,000 460,000
PB kg 120 107,543
KR (maksimum 30 mm) kg 150 154,506
Air ltr 38 7,600
Jumlah 729,649
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat 1 m3 beton mutu f'_x001E_uc_x001F_=14,5 MPa (K 175), slump (12_x001E__x001E__+_x001F__x001F_2) cm,
Bahan
PC kg 2,000 652,000
PB kg 120 91,526
KR (maksimum 30 mm) kg 150 154,807
Air ltr 38 8,170
Jumlah 906,503
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat 1 m3 beton mutu f'_x001E_uc_x001F_= 21,7 MPa (K 250), slump (12_x001E__x001E__+_x001F__x001F_2) cm,
Alat
Concrete Vibrator, dll jam 27,344 13,672
Jumlah 13,672
Bahan
PC kg 2,000 768,000
PB kg 120 83,337
Batu Pecah 2/3 (stone crusher) kg 347 360,533
Air ltr 38 8,170
Jumlah 1,220,040
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Membuat 1 m2 Meja Beton + Keramik (Toilet)
Bahan
Keramik 20x20 cm m2 95,000 104,500
Beton K.175 m3 #REF! #REF!
Papan cor / bekisting m3 6,255,651 430,389
Jumlah #REF!
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pembesian 10 kg dengan besi polos atau besi ulir
Bahan
Besi beton (polos/ulir) kg 25,300 265,650
Kawat beton kg 25,000 3,750
Jumlah 269,400
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang besi OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Jumlah/satuan kerja #REF!
Nilai HSPK #REF!
Memasang 10 kg kabel presstressed polos/strands
Bahan
Besi beton (polos/ulir) kg 25,300 265,650
Kawat beton kg 25,000 2,500
Jumlah 268,150
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang besi OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 begisting untuk pondasi
Bahan
Kayu kelas IV m3 4,326,826 173,073
Paku 5 cm - 10 cm kg 23,900 7,170
Minyak begisting ltr 15,800 1,580
Jumlah 181,823
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Jumlah /Satuan Kerja #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 begisting untuk sloof
Bahan
Kayu kelas IV m3 4,326,826 194,707
Paku 5 cm - 10 cm kg 23,900 7,170
Minyak begisting ltr 15,800 1,580
Jumlah 203,457
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Jumlah / Satuan Kerja #REF!
Nilai HSPK #REF!
Memasang 1 m2 begisting untuk kolom
Bahan
Kayu kelas IV m3 4,326,826 173,073
Paku 5 cm - 12 cm kg 23,900 9,560
Minyak begisting ltr 15,800 3,160
Balok kayu kelas III m3 6,255,651 93,835
Playwood tebal 9 mm lbr 247,400 86,590
Dolken kayu galam ø (8-10)cm pj.4m btg 227,300 454,600
Jumlah 820,818
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Jumlah /satuan kerja #REF!
Nilai HSPK #REF!
Memasang 1 m2 begisting untuk balok
Bahan
Kayu kelas IV m3 4,326,826 173,073
Paku 5 cm - 12 cm kg 23,900 9,560
Minyak begisting ltr 15,800 3,160
Balok kayu kelas III m3 6,255,651 112,602
Playwood tebal 9 mm lbr 247,400 86,590
Dolken kayu galam ø (8-10)cm pj.4m btg 227,300 454,600
Jumlah 839,585
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Harga/Satuan Kerja #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 begisting untuk plat lantai
Bahan
Kayu kelas IV m3 4,326,826 173,073
Paku 5 cm - 12 cm kg 23,900 9,560
Minyak begisting ltr 15,800 3,160
Balok kayu kelas III m3 6,255,651 93,835
Playwood tebal 9 mm lbr 247,400 86,590
Dolken kayu galam ø (8-10)cm pj.4m btg 227,300 1,363,800
Jumlah 1,730,018
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Jumlah/satuan kerja #REF!
Nilai HSPK #REF!
Memasang 1 m2 begisting untuk dinding
Bahan
Kayu kelas IV m3 4,326,826 129,805
Paku 5 cm - 12 cm kg 23,900 9,560
Minyak begisting ltr 15,800 3,160
Balok kayu kelas III m3 6,255,651 125,113
Playwood tebal 9 mm lbr 247,400 86,590
Dolken kayu galam ø (8-10)cm pj.4m btg 227,300 681,900
Formit/penjaga jarak begisting/spacer bh 5,000 20,000
Jumlah 1,056,128
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 begisting untuk tangga
Bahan
Kayu kelas IV m3 4,326,826 129,805
Paku 5 cm - 12 cm kg 23,900 9,560
Minyak begisting ltr 15,800 2,370
Balok kayu kelas III m3 6,255,651 93,835
Playwood tebal 9 mm lbr 247,400 86,590
Dolken kayu galam ø (8-10)cm pj.4m btg 227,300 454,600
Jumlah 776,760
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 jembatan untuk pengecoran beton
Bahan
Kayu kelas III (papan) m3 6,255,651 165,149
Paku 5 cm - 12 cm kg 23,900 14,340
Dolken kayu galam ø (8-10)cm pj.4m btg 227,300 113,650
Jumlah 293,139
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat 1 m' kolom praktis beton bertulang
Bahan
Kayu kelas III m3 6,255,651 12,511
Paku 5 cm - 12 cm kg 23,900 239
Besi beton polos kg 25,300 75,900
Kawat beton kg 25,000 1,125
PC kg 2,000 8,000
PB m3 168,600 1,012
KR m3 203,100 1,828
Jumlah 100,615
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Tukang besi OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat 1 m' ring balok beton bertulang
Bahan
Kayu kelas III m3 6,255,651 18,767
Paku 5 cm - 12 cm kg 23,900 478
Besi beton polos kg 25,300 91,080
Kawat beton kg 25,000 1,250
PC kg 2,000 11,000
PB m3 168,600 1,517
KR m3 203,100 3,047
Jumlah 127,139
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Tukang besi OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Membuat 1 m' ring balok tengah beton bertulang
Bahan
Kayu kelas III m3 6,255,651 6,256
Paku 5 cm - 12 cm kg 23,900 239
Besi beton polos kg 25,300 75,900
Kawat beton kg 25,000 1,125
PC kg 2,000 8,000
PB m3 168,600 1,012
KR m3 203,100 1,828
Jumlah 94,360
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Tukang besi OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat 1 m2 Paving Block tipe Tapak Kuda
Bahan
Paving Block (tipe tapak kuda bh 5,320 212,800
Pasir dasar m3 154,200 7,710
Pasir halus m3 203,100 1,016
Jumlah 221,526
Tenaga Kerja
Pembantu tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Batu Andesit Bakar
Bahan
Batu andesit bakar m2 298,500 298,500
PC kg 2,000 25,500
PP m3 203,100 8,530
Semen warna kg 4,100 8,200
Jumlah 340,730
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
PEKERJAAN KAYU
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II
Bahan
Balok kayu m3 8,235,034 9,882,041
Paku 10 cm kg 23,900 29,875
Lem kayu kg 57,000 57,000
Jumlah 9,968,916
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat dan memasang 1 m2 pintu dan jendela kaca, UPVC
Bahan
Bingkai UPVC m 254,918 1,019,672
Kosen UPVC m 449,877 1,799,508
Kaca 5 mm m2 315,037 266,521
Lem kg 57,000 17,100
Jumlah 3,102,801
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat dan memasang 1 m2 pintu dan jendela kaca, UPVC
Bahan
Bingkai UPVC m 254,918 1,019,672
Kosen UPVC m 449,877 1,799,508
Kaca 8 mm m2 1,029,533 870,985
Lem kg 57,000 17,100
Jumlah 3,707,265
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat dan memasang 1 m2 pintu dan jendela UPVC
Bahan
Kosen UPVC m 449,877 1,799,508
Daun UPVC m2 750,678 750,678
Lem kg 57,000 17,100
Jumlah 2,567,286
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II
Bahan
Papan kayu m3 8,235,034 329,401
Lem kayu kg 57,000 28,500
Jumlah 357,901
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II
Bahan
Papan kayu m3 8,235,034 197,641
Kaca m2 263,500 263,500
Lem kayu kg 57,000 17,100
Jumlah 478,241
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 bh daun pintu PVC
Bahan
Daun pintu PVC bh 443,000 443,000
Kosen UPVC m 449,877 1,349,631
Lem kg 57,000 28,500
Jumlah 1,821,131
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
Bahan
Balok kayu m3 8,235,034 9,058,537
Besi strip tebal 5 mm kg 32,600 489,000
Paku 12 cm kg 23,900 133,840
Jumlah 9,681,377
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m' lisplank ukuran 2 (2x20) cm, kayu kelas II
Bahan
Papan kayu m3 8,235,034 65,880
Paku 5 cm dan 7 cm kg 23,900 2,390
Jumlah 68,270
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m' lisplank ukuran (1x20) cm, Calciboard
Bahan
Calciboard lbr 308,695 21,609
Paku 5 cm dan 7 cm kg 23,900 2,390
Jumlah 23,999
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN PENUTUP ATAP
Memasang 1 m2 Atap Seng Genteng
Bahan
Genteng seng (tekstur pasir) lbr 189,600 280,608
Paku ulir kg 40,700 2,442
Jumlah 283,050
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Atap Seng Gelombang
Bahan
Seng gelombang lbr 92,600 70,654
Paku atap kg 49,600 5,952
Jumlah 76,606
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 Atap Zincalume
Bahan
Zincalume m2 93,000 102,300
Paku skrup kg 40,700 4,884
Jumlah 107,184
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN LANGIT-LANGIT
Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm, tebal 3 mm, dan 4 mm
Bahan
Tripleks lbr 104,500 39,188
Paku tripleks kg 23,900 717
Jumlah 39,905
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm
Bahan
Gypsum board lbr 137,400 50,014
Paku skrup kg 40,700 4,477
Jumlah 54,491
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 Plafon gypsum board ukuran (1200x2400x9) mm + Rangka
Bahan
Gypsum board lbr 137,400 50,014
Besi Hollow 20x40 mm btg 193,800 46,512
Besi Hollow 30x40 mm btg 269,400 64,656
Suspension Rop Clip 3 mm m' 5,200 36,400
Mur + Ring bh 1,400 19,600
Paku skrup kg 57,000 6,270
Jumlah 223,452
Pekerja OH #REF! #REF!
Tenaga Kerja
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Plafon Calciboard ukuran (1200x2400x10) mm + Rangka
Bahan
Calciboard lbr 308,695 112,365
Besi Hollow 20x40 mm btg 193,800 46,512
Besi Hollow 30x40 mm btg 269,400 64,656
Suspension Rop Clip 3 mm m' 5,200 36,400
Mur + Ring bh 1,400 19,600
Paku skrup kg 57,000 6,270
Jumlah 285,803
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Plafon gypsum board ukuran (1200x2400x9) mm + Rangka
Bahan
Gypsum board lbr 137,400 50,014
Rangka Furing aluminium Btg 51,800 51,800
Penggantung (Y. Angle) Btg 43,900 43,900
Paku skrup kg 57,000 6,270
Jumlah 151,984
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 Plafon Triplek ukuran (1200x2400x6) mm + Rangka
Bahan
Triplek lbr 178,000 64,792
Rangka Furing aluminium Btg 51,800 51,800
Penggantung (Y. Angle) Btg 43,900 43,900
Paku skrup kg 40,700 4,477
Jumlah 164,969
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m' list plafond gypsum profil
Bahan
List gypsum profil m' 24,800 26,040
Tepung gypsum kg 7,125 1,069
Jumlah 27,109
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m' list plafond triplek kayu profil
Bahan
List kayu profil m' 6,900 7,245
Paku kg 23,900 239
Jumlah 7,484
Pekerja OH #REF! #REF!
Tenaga Kerja
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 langit-langit papan rider + rangka kayu klas II
Bahan
Kayu keras M3 8,235,034 189,406
Paku 2" - 5" Kg 23,900 1,434
Papan rider M 36,800 193,200
Jumlah 384,040
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
PEKERJAAN PIPA DAN SANITASI
Memasang 1 Bh Klosed Duduk + Tangki
Bahan
Klosed Duduk pakai tangki bh 3,236,400 3,236,400
Perlengkapan 6% Harga Klosed - 3,236,400 194,184
Jumlah 3,430,584
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Klosed Jongkok Keramik
Bahan
Klosed Jongkok setara Ex.TOTO bh 3,238,606 3,238,606
PC kg 2,000 12,000
PP m3 203,100 2,031
Jumlah 3,252,637
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Urinoir
Bahan
Urinoir keramik standar bh 2,204,200 2,204,200
Perlengkapan 30% Harga Urinoir - 2,204,200 661,260
PC kg 2,000 12,000
PP m3 203,100 2,031
Jumlah 2,879,491
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Wastafel
Bahan
Wastafel bh 1,858,555 1,858,555
Perlengkapan 12% Harga Wastafel - 1,858,555 223,027
PC kg 2,000 12,000
PP m3 203,100 2,031
Jumlah 2,095,613
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 Bh Bak Mandi Fibreglass vol.0,3 m3
Bahan
Bak Fibreglass bh 614,200 614,200
Perlengkapan 18% Harga Bak - 614,200 110,556
Jumlah 724,756
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 M' Pipa Galvanis dia. 1,50"
Bahan
Pipa Galvanis m' 102,400 122,880
Perlengkapan 15% Harga Pipa - 102,400 15,360
Jumlah 138,240
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 M' Pipa PVC Type AW dia. 3/4"
Bahan
Pipa PVC m' 8,700 10,440
Perlengkapan 12% Harga Pipa - 8,700 1,044
Jumlah 11,484
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 M' Pipa PVC Type AW dia. 3"
Bahan
Pipa PVC m' 51,900 62,280
Perlengkapan 12% Harga Pipa - 51,900 6,228
Jumlah 68,508
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 M' Pipa PVC Type AW dia. 4"
Bahan
Pipa PVC m' 86,100 103,320
Perlengkapan 12% Harga Pipa - 86,100 10,332
Jumlah 113,652
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Bak Cuci Piring Stainless Steel (1 bak)
Bahan
Bak Cuci Piring Stainless Steel bh 499,200 499,200
Water Drain + Asesories set 143,700 143,700
Jumlah 642,900
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Bak Cuci Piring Stainless Steel (2 bak)
Bahan
Bak Cuci Piring Stainless Steel bh 801,200 801,200
Water Drain + Asesories set 143,700 143,700
Jumlah 944,900
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Kran diameter 3/4" atau 1/2"
Bahan
Kran Air bh 184,361 184,361
Water Drain + Asesories set 143,700 3,593
Jumlah 187,954
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 Bh Kran Paruh Angsa
Bahan
Kran Air bh 253,100 253,100
Water Drain + Asesories set 143,700 3,593
Jumlah 256,693
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 Bh Floor Drain
Bahan
Floor Drain bh 298,963 298,963
Jumlah 298,963
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 M Pipa GSP Medium Class 10 kg/cm2, GSP-02, ø 20 mm
Bahan
Pipa GSP ø 20 mm m' 32,300 32,300
Seal tape bh 7,190 360
Cat besi kg 59,200 4,227
Hangger / support pcs 3,595 3,595
Jumlah 40,482
Upah
Upah pasang Ls 7,084 7,084
Jumlah 7,084
Nilai HSPK 47,566
Memasang 1 M Pipa GSP Medium Class 10 kg/cm2, GSP-02, ø 25 mm
Bahan
Pipa GSP ø 25 mm m' 58,900 58,900
Seal tape bh 7,190 553
Cat besi kg 59,200 7,891
Hangger / support pcs 3,595 3,595
Jumlah 70,939
Upah
Upah pasang Ls 12,414 12,414
Jumlah 12,414
Nilai HSPK 83,353
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 M Pipa GSP Medium Class 10 kg/cm2, GSP-02, ø 40 mm
Bahan
Pipa GSP ø 40 mm m' 102,400 102,400
Seal tape bh 7,190 553
Cat besi kg 59,200 7,891
Hangger / support pcs 3,595 3,595
Jumlah 114,439
Upah
Upah pasang Ls 20,027 20,027
Jumlah 20,027
Nilai HSPK 134,466
Memasang 1 Bh Ball Valves, GLV ø 40 mm
Bahan
GLV ø 40 mm bh 462,600 462,600
Seal tape bh 7,190 899
Alat kerja Ls 2,317 2,317
Jumlah 465,816
Upah
Upah pasang Ls 7,919 7,919
Jumlah 7,919
Nilai HSPK 473,735
Memasang 1 Bh Ball Valves, GLV ø 65 mm
Bahan
GLV ø 65 mm m' 860,700 860,700
Seal tape bh 7,190 1,250
Alat kerja Ls 4,310 4,310
Jumlah 866,260
Upah
Upah pasang Ls 14,726 14,726
Jumlah 14,726
Nilai HSPK 880,986
Memasang 1 M Pipa PVC Medium Class 10 kg/cm2, PPC-D, ø 80 mm
Bahan
Pipa PVC AW ø 3" btg 311,400 77,850
Lem PVC Tube 12,600 1,260
Seal tape Bh 7,190 719
Hangger / support pcs 3,595 3,595
Jumlah 83,424
Upah
Upah pasang Ls 5,423 5,423
Jumlah 5,423
Nilai HSPK 88,847
Memasang 1 M Pipa PVC Medium Class 10 kg/cm2, PPC-D, ø 100 mm
Bahan
Pipa PVC AW ø 4" btg 516,600 129,150
Lem PVC Tube 12,600 630
Seal tape Bh 7,190 719
Hangger / support pcs 3,595 3,595
Jumlah 134,094
Upah
Upah pasang Ls 6,034 6,034
Jumlah 6,034
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Nilai HSPK 140,128
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 Bh Floor Clean Out (FCO) ø 100 mm
Bahan
FCO ø 100 mm pcs 177,200 177,200
Sealent pcs 12,600 6,300
Alat kerja Ls 1,468 1,468
Jumlah 184,968
Upah
Upah pasang Ls 6,474 6,474
Jumlah 6,474
Nilai HSPK 191,442
PEKERJAAN BESI DAN ALUMINIUM
Memasang 1 kg besi profil
Bahan
Besi profil kg 32,600 37,490
Jumlah 37,490
Pekerja OH #REF! #REF!
Tenaga Kerja
Tukang las konstruksi OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 kaca rangka aluminium
Bahan
Rangka aluminium m 69,500 229,350
Profil kaca 5 mm m2 278,500 278,500
Sealant tube 60,000 16,200
Jumlah 524,050
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang aluminium/kaca OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 venetions blinds dan vertical blinds
Bahan
Venetions blind dan vertical blinds m 331,600 364,760
Jumlah 364,760
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 terali besi
Bahan
Besi ø 12" kg 25,300 631,184
Besi Siku L. 5.5.5 kg 32,600 245,804
Pengelasan cm 1,250 33,850
Jumlah 910,838
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang las OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 terali besi
Bahan
Besi ø 10" kg 25,300 218,364
Besi Strip 4x25 kg 32,600 95,616
Pengelasan cm 1,250 33,850
Jumlah 347,830
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang las OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m' talang datar / jurai seng BJLS=28 lebar 90 cm
Bahan
Seng plat m' 109,000 119,900
Paku 1 cm - 2,5 cm kg 23,900 239,000
Papan kayu kelas II m3 8,235,034 156,466
Jumlah 515,366
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m' talang 1/2 lingkaran D-15, seng plat BJLS 30 lebar 45 cm
Bahan
Seng plat m' 109,000 119,900
Paku 1 cm - 2,5 cm kg 23,900 239,000
Besi strip kg 32,600 619
Jumlah 359,519
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 Pagar Besi
Bahan
Besi Hollow ø 1,5' m' 44,900 98,780
Besi Hollow ø 1' m' 32,300 355,300
Jumlah 454,080
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang Las OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Jumlah harga per s Nilai HSPk #REF!
Memasang 1 m2 Pintu Pagar Besi
Bahan
Besi Hollow ø 1,5' m' 44,900 206,540
Besi Hollow ø 1' m' 32,300 355,300
Jumlah 561,840
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang Las OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Kaca tebal 5 mm
Bahan
Kaca polos m2 244,700 269,170
Jumlah 269,170
Pekerja OH #REF! #REF!
Tenaga Kerja
Tukang Kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Kaca tebal 8 mm
Bahan
Kaca polos m2 244,700 269,170
Jumlah 269,170
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang Kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 Kaca Buram tebal 12 mm
Bahan
Kaca buram m2 263,500 289,850
Jumlah 289,850
Pekerja OH #REF! #REF!
Tenaga Kerja
Tukang Kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Kaca Cermin tebal 5 mm
Bahan
Kaca cermin m2 199,500 219,450
Jumlah 219,450
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang Kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Kaca Cermin tebal 8 mm
Bahan
Kaca cermin m2 199,500 219,450
Jumlah 219,450
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang Kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN PENUTUP LANTAI DAN DINDING
Memasang 1 m2 lantai Granito ukuran (60x60) cm
Bahan
Granito m2 64,500 67,725
PC kg 2,000 19,600
PP m3 203,100 9,140
Semen warna kg 4,100 5,330
Jumlah 101,795
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 lantai keramik warna ukuran (60x60) cm
Bahan
Keramik warna bh 64,500 179,168
PC kg 2,000 19,600
PP m3 203,100 9,140
Semen warna kg 4,100 5,330
Jumlah 213,238
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 lantai keramik warna ukuran (40x40) cm
Bahan
Keramik warna bh 17,300 114,699
PC kg 2,000 19,600
PP m3 203,100 9,140
Semen warna kg 4,100 5,330
Jumlah 148,769
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 lantai keramik warna ukuran (30x30) cm
Bahan
Keramik warna bh 7,900 93,773
PC kg 2,000 20,000
PP m3 203,100 9,140
Semen warna kg 4,100 6,150
Jumlah 129,063
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 lantai keramik warna ukuran (20x20) cm
Bahan
Keramik warna bh 3,800 100,700
PC kg 2,000 20,800
PP m3 203,100 9,140
Semen warna kg 4,100 6,642
Jumlah 137,282
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 lantai keramik warna ukuran (25x25) cm
Bahan
Keramik warna bh 5,773 97,910
PC kg 2,000 20,800
PP m3 203,100 9,140
Semen warna kg 4,100 6,642
Jumlah 134,492
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m2 Dinding keramik warna ukuran (20x25) cm
Bahan
Keramik warna bh 5,800 122,960
PC kg 2,000 18,600
PP m3 203,100 3,656
Semen warna kg 4,100 6,150
Jumlah 151,366
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 m2 dinding keramik warna ukuran (25x40) cm
Bahan
Keramik warna bh 11,110 117,766
PC kg 2,000 20,800
PP m3 203,100 9,140
Semen warna kg 4,100 6,642
Jumlah 154,348
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 m' Step Nosing ukuran (7,5x30) cm
Bahan
Step Nosing bh 2,600 8,666
PC kg 2,000 2,280
PP m3 203,100 609
Semen warna kg 203,100 20,310
Jumlah 31,865
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang batu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN KUNCI-KUNCI
Memasang 1 bh Kunci Tanam Antik
Bahan
Kunci tanam antik Bh 334,300 334,300
Jumlah 334,300
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Memasang 1 bh Kunci Tanam Biasa
Bahan
Kunci tanam biasa 9" Bh 180,500 180,500
Jumlah 180,500
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 bh Kunci Tanam Kamar Mandi
Bahan
Kunci tanam kamar mandi 6" Bh 151,500 151,500
Jumlah 151,500
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang kayu OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN PENGECATAN
Mengikis/Mengerok 1 m2 Permukaan Cat Tembok Lama
Bahan
Soda Api kg 28,800 1,440
Jumlah 1,440
Tenaga Kerja
Pekerja OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pengecatan 1 m2 Bidang Kayu Baru (1 Lapis Plamir) 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup
Bahan
Cat Meni kg 59,200 11,840
Plamir kg 49,100 7,365
Cat Dasar kg 20,900 3,553
Cat Penutup 2 kali kg 59,200 13,794
Jumlah 36,552
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang cat OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pengecatan 1 m2 Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup
Bahan
Plamir kg 49,100 4,910
Cat Dasar kg 20,900 2,090
Cat Penutup 2 kali kg 23,746 6,174
Jumlah 13,174
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang cat OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Pengecatan 1 m2 Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup
Bahan
Plamir kg 49,100 4,910
Cat Dasar kg 20,900 2,090
Cat Penutup 2 kali (Dulux) kg 150,000 39,000
Jumlah 46,000
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang cat OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pengecatan 1 m2 Plafon (1 Lapis Plamir, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup
Bahan
Plamir kg 49,100 4,910
Cat Dasar kg 20,900 2,090
Cat Penutup 2 kali (Danabrite) kg 35,400 9,204
Jumlah 16,204
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang cat OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
Pengecatan Tembok Lama (1 Lapis Cat Dasar dan 2 Lapis Cat Penutup)
Bahan
Cat Dasar kg 20,900 2,508
Cat Penutup 2 kali kg 23,746 4,274
Jumlah 6,782
Tenaga Kerja
Pekerja OH #REF! #REF!
Tukang cat OH #REF! #REF!
Kepala tukang OH #REF! #REF!
Mandor OH #REF! #REF!
Jumlah #REF!
Nilai HSPK #REF!
PEKERJAAN INSTALASI LISTRIK
Memasang 1 M Kabel NYY 4x10 mm
Bahan
Kabel NYY 4x10 mm m' 1,944 1,944
Sepatu kabel, pengikat, klem
dan alat kerja Ls 350 350
Jumlah 2,294
Upah
Upah pasang Ls 241 241
Jumlah 241
Nilai HSPK 2,535
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 Bh Panel Hubung Bagi, P-1
Bahan
Panel P-1 unit 16,460,000 16,460,000
Peralatan bantu Ls 823,000 823,000
Jumlah 17,283,000
Upah
Upah pasang Ls 190,936 190,936
Jumlah 190,936
Nilai HSPK 17,473,936
Memasang 1 Bh Lampu TL 1x40 W
Bahan
Lampu TL 1x40W Bh 284,800 284,800
Peralatan bantu & penggantung Ls 19,936 19,936
Jumlah 304,736
Upah
Upah pasang Ls 17,088 17,088
Jumlah 17,088
Nilai HSPK 321,824
Memasang 1 Bh Lampu TL 2x40 W
Bahan
Lampu TL 2x40W Bh 572,700 572,700
Peralatan bantu & penggantung Ls 20,045 20,045
Jumlah 592,745
Upah
Upah pasang Ls 17,181 17,181
Jumlah 17,181
Nilai HSPK 609,926
Memasang 1 Bh Lampu SL 20 W
Bahan
Lampu PLC 20W Bh 44,300 44,300
Peralatan bantu & penggantung Ls 4,430 4,430
Jumlah 48,730
Upah
Upah pasang Ls 15,505 15,505
Jumlah 15,505
Nilai HSPK 64,235
Memasang 1 Bh Lampu SL 40 W
Bahan
Lampu PLC 40W Bh 75,900 75,900
Peralatan bantu & penggantung Ls 22,770 22,770
Jumlah 98,670
Upah
Upah pasang Ls 16,698 16,698
Jumlah 16,698
Nilai HSPK 115,368
Memasang 1 Bh Lampu SL Downlight
Bahan
Downlight Bh 329,100 329,100
Perlengkapan - 329,100 49,365
Jumlah 378,465
Upah
Upah pasang Ls 98,730 98,730
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Jumlah 98,730
Nilai HSPK 477,195
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 Bh Saklar Tunggal 10A, 250V
Bahan
Saklar tunggal Bh 30,505 30,505
Kotak sambung & peralatan bantu Ls 3,661 3,661
Jumlah 34,166
Upah
Upah pasang Ls 19,218 19,218
Jumlah 19,218
Nilai HSPK 53,384
Memasang 1 Bh Saklar Ganda 10A, 250V
Bahan
Saklar ganda Bh 49,792 49,792
Kotak sambung & peralatan bantu Ls 3,784 3,784
Jumlah 53,576
Upah
Upah pasang Ls 19,419 19,419
Jumlah 19,419
Nilai HSPK 72,995
Memasang 1 Bh Saklar Triple 10A, 250V
Bahan
Saklar triple Bh 78,232 78,232
Kotak sambung & peralatan bantu Ls 3,912 3,912
Jumlah 82,144
Upah
Upah pasang Ls 19,558 19,558
Jumlah 19,558
Nilai HSPK 101,702
Memasang 1 Bh Instalasi Penerangan
Bahan
Kabel NYM 3x2,5 Putih (50 m) Roll 16,941 6,776
Pipa Flexible Listrik (30 m) m' 3,542 42,504
Kotak sambung Fitting dan
peralatan bantu Ls 68 68
Jumlah 49,348
Upah
Upah pasang Ls 627 627
Jumlah 627
Nilai HSPK 49,975
Memasang 1 Bh Instalasi Kotak-kontak
Bahan
Kabel NYM 3x2,5 Putih (50 m) Roll 16,941 6,776
Pipa Flexible Listrik (30 m) m' 3,542 42,504
Kotak sambung Fitting dan
peralatan bantu Ls 68 68
Jumlah 49,348
Upah
Upah pasang Ls 847 847
Jumlah 847
Nilai HSPK 50,195
B. FISIK
1. HSPK GEDUNG

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN SATUAN KETERANGAN
(Rp.) (Rp.)
Memasang 1 Bh Kotak Kontak 1 Fase, 15 A, 250 V
Bahan
Kotak Kontak 1 fase, 15A, 250V Bh 73,418 29,367
Kotak sambung Fitting dan
peralatan bantu Ls 8,076 8,076
Jumlah 37,443
Upah
Upah pasang Ls 22,025 22,025
Jumlah 22,025
Nilai HSPK 59,468
4. HSPK BANGUNAN MCK

II. PEKERJAAN TANAH

II.6.1. Menggali 1 m3 tanah biasa sedalam 1 meter

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Tenaga Kerja Pekerja OH 0.750 95,000 71,250
Mandor OH 0.025 150,000 3,750
Nilai HSPK 75,000

II.6.9. Mengurug kembali 1 m3 galian

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Tenaga Kerja Pekerja OH 0.250 95,000 23,750
Mandor OH 0.008 150,000 1,200
Nilai HSPK 24,950

II.6.11. Mengurug 1 m3 pasir urug

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan PU m3 1.200 169,600 203,520
Tenaga Kerja Pekerja OH 0.300 95,000 28,500
Mandor OH 0.010 150,000 1,500
Nilai HSPK 233,520

II.6.16. Mengurug 1 m3 tanah timbunan

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Tanah timbunan m3 1.200 129,600 155,520
Tenaga Kerja Pekerja OH 0.250 95,000 23,750
Mandor OH 0.025 150,000 3,750
Nilai HSPK 183,020
III. PEKERJAAN PONDASI

III.6.2. Memasang 1 m3 pondasi batu kali, campuran 1 PC : 4 PP

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Batu kali m3 1.200 265,200 318,240
Bahan PC kg 163.000 2,200 358,600
PP m3 0.520 223,400 116,168
Jumlah 793,008
Pekerja OH 1.500 95,000 142,500
Tenaga Kerja Tukang batu OH 0.750 130,500 97,875
Kepala tukang OH 0.075 150,000 11,250
Mandor OH 0.075 150,000 11,250
Jumlah 262,875
Nilai HSPK 1,055,883

IV. PEKERJAAN DINDING

IV.6.9. Memasang 1 m2 dinding batu merah ukuran (5x11x22) cm tebal 1/2 bata, campuran 1 PC : 4 PP
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Batu merah bh 70.000 1,000 70,000
Bahan PC kg 11.500 2,200 25,300
PP m3 0.043 223,400 9,606
Jumlah 104,906
Pekerja OH 0.300 95,000 28,500
Tenaga Kerja Tukang batu OH 0.100 130,500 13,050
Kepala tukang OH 0.010 150,000 1,500
Mandor OH 0.015 150,000 2,250
Jumlah 45,300
Nilai HSPK 150,206

V. PEKERJAAN PLESTERAN

V.6.2. Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan PC kg 10.224 2,200 22,493
PP m3 0.020 223,400 4,468
Jumlah 26,961
Pekerja OH 0.300 95,000 28,500
Tenaga Kerja Tukang batu OH 0.150 130,500 19,575
Kepala tukang OH 0.015 150,000 2,250
Mandor OH 0.015 150,000 2,250
Jumlah 52,575
Nilai HSPK 79,536
V.6.4. Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan PC kg 6.240 2,200 13,728
PP m3 0.024 223,400 5,362
Jumlah 19,090
Pekerja OH 0.300 95,000 28,500
Tenaga Kerja Tukang batu OH 0.150 130,500 19,575
Kepala tukang OH 0.015 150,000 2,250
Mandor OH 0.015 150,000 2,250
Jumlah 52,575
Nilai HSPK 71,665

VI. PEKERJAAN BETON

VI.6.1. Membuat 1 m3 beton mutu f'_x001E_uc_x001F_=7,4 MPa (K 100), slump (12_x001E__x001E__+_x001F__x001F_2) cm, w/c = 0,87
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
PC kg 247.000 2,200 543,400
Bahan PB kg 869.000 133 115,143
KR (maksimum 30 mm) kg 999.000 165 165,316
Air ltr 215.000 38 8,170
Jumlah 832,029
Pekerja OH 1.650 95,000 156,750
Tenaga Kerja Tukang batu OH 0.275 130,500 35,888
Kepala tukang OH 0.028 150,000 4,200
Mandor OH 0.083 150,000 12,450
Jumlah 209,288
Nilai HSPK 1,041,317

VI.6.17. Pembesian 10 kg dengan besi polos atau besi ulir


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Besi beton (polos/ulir) kg 10.500 27,500 288,750
Kawat beton kg 0.150 27,500 4,125
Jumlah 292,875
Pekerja OH 0.070 95,000 6,650
Tenaga Kerja Tukang besi OH 0.070 130,500 9,135
Kepala tukang OH 0.007 150,000 1,050
Mandor OH 0.004 150,000 600
Jumlah 17,435
Nilai HSPK 310,310
per kg 31,031
VI.6.21. Memasang 1 m2 begisting untuk sloof

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Kayu kelas IV m3 0.045 4,759,500 214,178
Bahan Paku 5 cm - 10 cm kg 0.300 26,300 7,890
Minyak begisting ltr 0.100 17,400 1,740
Jumlah 223,808
Pekerja OH 0.520 95,000 49,400
Tenaga Kerja Tukang kayu OH 0.260 130,500 33,930
Kepala tukang OH 0.026 150,000 3,900
Mandor OH 0.026 150,000 3,900
Jumlah 91,130
Nilai HSPK 314,938
1,5 x pakai 209,959

VI.6.22. Memasang 1 m2 begisting untuk kolom


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Kayu kelas IV m3 0.040 4,759,500 190,380
Paku 5 cm - 12 cm kg 0.400 26,300 10,520
Bahan Minyak begisting ltr 0.200 17,400 3,480
Balok kayu kelas III m3 0.015 6,881,200 103,218
Playwood tebal 9 mm lbr 0.350 272,100 95,235
Dolken kayu galam ø (8-10)cm btg 2.000 60,900 121,800
Jumlah 524,633
Pekerja OH 0.660 95,000 62,700
Tenaga Kerja Tukang kayu OH 0.330 130,500 43,065
Kepala tukang OH 0.033 150,000 4,950
Mandor OH 0.033 150,000 4,950
Jumlah 115,665
Nilai HSPK 640,298
1,5 x pakai 426,865
VI.6.24. Memasang 1 m2 begisting untuk plat lantai
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah (Rp) Jumlah (Rp)
Kayu kelas IV m3 0.040 4,759,500 190,380
Paku 5 cm - 12 cm kg 0.400 26,300 10,520
Bahan Minyak begisting ltr 0.200 17,400 3,480
Balok kayu kelas III m3 0.015 6,881,200 103,218
Playwood tebal 9 mm lbr 0.350 272,100 95,235
Dolken kayu galam ø (8-10)cm btg 6.000 60,900 365,400
Jumlah 768,233
Pekerja OH 0.660 95,000 62,700
Tenaga Kerja Tukang kayu OH 0.330 130,500 43,065
Kepala tukang OH 0.033 150,000 4,950
Mandor OH 0.033 150,000 4,950
Jumlah 115,665
Nilai HSPK 883,898
1 x pakai 883,898
VI.6.35. Membuat 1 m' kolom praktis beton bertulang
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Kayu kelas III m3 0.002 6,881,200 13,762
Paku 5 cm - 12 cm kg 0.010 26,300 263
Besi beton polos kg 3.000 27,500 82,500
Bahan Kawat beton kg 0.045 27,500 1,238
PC kg 4.000 2,200 8,800
PB m3 0.006 185,500 1,113
KR m3 0.009 223,400 2,011
Jumlah 109,687
Pekerja OH 0.180 95,000 17,100
Tukang batu OH 0.020 130,500 2,610
Tenaga Kerja Tukang kayu OH 0.020 130,500 2,610
Tukang besi OH 0.020 130,500 2,610
Kepala tukang OH 0.006 150,000 900
Mandor OH 0.009 150,000 1,350
Jumlah 27,180
Nilai HSPK 136,867

VII. PEKERJAAN KAYU

VII.6.2. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Balok kayu m3 1.200 9,058,500 10,870,200
Bahan Paku 10 cm kg 1.250 26,300 32,875
Lem kayu kg 1.000 62,700 62,700
Jumlah 10,965,775
Pekerja OH 6.000 95,000 570,000
Tenaga Kerja Tukang kayu OH 18.000 130,500 2,349,000
Kepala tukang OH 1.800 150,000 270,000
Mandor OH 0.300 150,000 45,000
Jumlah 3,234,000
Nilai HSPK 14,199,775

VII.6.5. Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Papan kayu m3 0.040 9,058,500 362,340
Lem kayu kg 0.500 62,700 31,350
Jumlah 393,690
Pekerja OH 1.000 95,000 95,000
Tenaga Kerja Tukang kayu OH 3.000 130,500 391,500
Kepala tukang OH 0.300 150,000 45,000
Mandor OH 0.050 150,000 7,500
Jumlah 539,000
Nilai HSPK 932,690
VII.6.13. Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Balok kayu m3 1.100 9,058,500 9,964,350
Bahan Besi strip tebal 5 mm kg 15.000 35,900 538,500
Paku 12 cm kg 5.600 26,300 147,280
Jumlah 10,650,130
Pekerja OH 4.000 95,000 380,000
Tenaga Kerja Tukang kayu OH 12.000 130,500 1,566,000
Kepala tukang OH 1.200 150,000 180,000
Mandor OH 0.200 150,000 30,000
Jumlah 2,156,000
Nilai HSPK 12,806,130

VII.6.20. Memasang 1 m2 rangka langit-langit (100x100) cm, kayu kelas III

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Kaso-kaso (4x6) cm m3 0.0096 6,881,200 66,060
Paku 7 cm - 10 cm kg 0.250 26,300 6,575
Jumlah 72,635
Pekerja OH 0.200 95,000 19,000
Tenaga Kerja Tukang kayu OH 0.300 130,500 39,150
Kepala tukang OH 0.030 150,000 4,500
Mandor OH 0.010 150,000 1,500
Jumlah 64,150
Nilai HSPK 136,785

VII.6.21. Memasang 1 m' lisplank ukuran (2x20) cm, kayu kelas II

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Papan kayu m3 0.004 9,058,500 36,234
Paku 5 cm dan 7 cm kg 0.100 26,300 2,630
Jumlah 38,864
Pekerja OH 0.100 95,000 9,500
Tenaga Kerja Tukang kayu OH 0.200 130,500 26,100
Kepala tukang OH 0.020 150,000 3,000
Mandor OH 0.005 150,000 750
Jumlah 39,350
Nilai HSPK 78,214
VIII. PEKERJAAN PENUTUP ATAP

VIII.6.7. Memasang 1 m2 Atap Seng Genteng

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Genteng seng lbr 1.100 138,200 152,020
Paku ulir kg 0.060 44,800 2,688
Jumlah 154,708
Pekerja OH 0.140 95,000 13,300
Tenaga Kerja Tukang OH 0.067 130,500 8,744
Kepala tukang OH 0.007 150,000 1,050
Mandor OH 0.007 150,000 1,050
Jumlah 24,144
Nilai HSPK 178,852

VIII.6.11. Memasang 1 m2 Atap Seng Gelombang

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Seng gelombang lbr 0.763 101,900 77,750
Paku atap kg 0.120 54,600 6,552
Jumlah 84,302
Pekerja OH 0.140 95,000 13,300
Tenaga Kerja Tukang OH 0.070 130,500 9,135
Kepala tukang OH 0.007 150,000 1,050
Mandor OH 0.007 150,000 1,050
Jumlah 24,535
Nilai HSPK 108,837

VIII.6.12. Memasang 1 m2 Atap Zincalume

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Zincalume m2 1.100 102,300 112,530
Paku skrup kg 0.120 44,800 5,376
Jumlah 117,906
Pekerja OH 0.140 95,000 13,300
Tenaga Kerja Tukang OH 0.070 130,500 9,135
Kepala tukang OH 0.007 150,000 1,050
Mandor OH 0.007 150,000 1,050
Jumlah 24,535
Nilai HSPK 142,441
IX. PEKERJAAN LANGIT-LANGIT

IX.6.5. Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm, tebal 3 mm, dan 4 mm
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Tripleks lbr 0.375 115,000 43,125
Paku tripleks kg 0.030 26,300 789
Jumlah 43,914
Pekerja OH 0.100 95,000 9,500
Tenaga Kerja Tukang kayu OH 0.100 130,500 13,050
Kepala tukang OH 0.010 150,000 1,500
Mandor OH 0.005 150,000 750
Jumlah 24,800
Nilai HSPK 68,714

IX.6.8.a Memasang 1 m' list plafond triplek kayu profil

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan List kayu profil m' 1.050 7,600 7,980
Paku kg 0.010 26,300 263
Jumlah 8,243
Pekerja OH 0.021 95,000 1,995
Tenaga Kerja Tukang kayu OH 0.021 130,500 2,741
Kepala tukang OH 0.002 150,000 300
Mandor OH 0.001 150,000 150
Jumlah 5,186
Nilai HSPK 13,429

X. PEKERJAAN PIPA DAN SANITASI

X.6.2. Memasang 1 Bh Klosed Jongkok Keramik


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Klosed Jongkok Porselin bh 1.000 487,300 487,300
Bahan PC kg 6.000 2,200 13,200
PP m3 0.010 223,400 2,234
Jumlah 502,734
Pekerja OH 0.100 95,000 9,500
Tenaga Kerja Tukang OH 0.150 130,500 19,575
Kepala tukang OH 0.150 150,000 22,500
Mandor OH 0.016 150,000 2,400
Jumlah 53,975
Nilai HSPK 556,709
X.6.25.a Memasang 1 M' Pipa PVC Type AW dia. 3/4"
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 9,947 11,936
Perlengkapan 12% Harga Pipa - 0.120 9,947 1,194
Jumlah 13,130
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0060 130,500 783
Kepala tukang OH 0.0018 150,000 270
Mandor OH 0.0018 150,000 270
Jumlah 4,743
Nilai HSPK 17,873

X.6.25.d Memasang 1 M' Pipa PVC Type AW dia. 1,5"


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 23,501 28,201
Perlengkapan 12% Harga Pipa - 0.120 23,501 2,820
Jumlah 31,021
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0600 130,500 7,830
Kepala tukang OH 0.0060 150,000 900
Mandor OH 0.0018 150,000 270
Jumlah 12,420
Nilai HSPK 43,441

X.6.25.e Memasang 1 M' Pipa PVC Type AW dia. 2"


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 30,059 36,071
Perlengkapan 12% Harga Pipa - 0.120 30,059 3,607
Jumlah 39,678
Pekerja OH 0.0540 95,000 5,130
Tenaga Kerja Tukang OH 0.0900 130,500 11,745
Kepala tukang OH 0.0090 150,000 1,350
Mandor OH 0.0027 150,000 405
Jumlah 18,630
Nilai HSPK 58,308

X.6.25.f Memasang 1 M' Pipa PVC Type AW dia. 2,5"


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 43,941 52,729
Perlengkapan 12% Harga Pipa - 0.120 43,941 5,273
Jumlah 58,002
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0600 130,500 7,830
Kepala tukang OH 0.0060 150,000 900
Mandor OH 0.0018 150,000 270
Jumlah 12,420
Nilai HSPK 70,422
X.6.25.g Memasang 1 M' Pipa PVC Type AW dia. 3"
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 59,244 71,093
Perlengkapan 12% Harga Pipa - 0.120 59,244 7,109
Jumlah 78,202
Pekerja OH 0.0810 95,000 7,695
Tenaga Kerja Tukang OH 0.1250 130,500 16,313
Kepala tukang OH 0.1350 150,000 20,250
Mandor OH 0.0041 150,000 615
Jumlah 44,873
Nilai HSPK 123,075

X.6.35 Memasang 1 Bh Kran diameter 3/4" atau 1/2"


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Kran Air bh 1.000 30,700 30,700
Water Drain + Asesories set 0.025 158,100 3,953
Jumlah 34,653
Pekerja OH 0.010 95,000 950
Tenaga Kerja Tukang OH 0.100 130,500 13,050
Kepala tukang OH 0.010 150,000 1,500
Mandor OH 0.005 150,000 750
Jumlah 16,250
Nilai HSPK 50,903

X.6.36 Memasang 1 Bh Floor Drain


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Floor Drain bh 1.000 29,300 29,300
Jumlah 29,300
Pekerja OH 0.010 95,000 950
Tenaga Kerja Tukang OH 0.100 130,500 13,050
Kepala tukang OH 0.010 150,000 1,500
Mandor OH 0.005 150,000 750
Jumlah 16,250
Nilai HSPK 45,550
XII. PEKERJAAN PENUTUP LANTAI DAN DINDING

XII.6.4.a Memasang 1 m2 lantai keramik warna ukuran (40x40) cm

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Keramik warna bh 6.630 19,000 125,970
Bahan PC kg 9.800 2,200 21,560
PP m3 0.045 223,400 10,053
Semen warna kg 1.300 4,500 5,850
Jumlah 163,433
Pekerja OH 0.700 95,000 66,500
Tenaga Kerja Tukang batu OH 0.350 130,500 45,675
Kepala tukang OH 0.035 150,000 5,250
Mandor OH 0.035 150,000 5,250
Jumlah 122,675
Nilai HSPK 286,108

XII.6.6. Memasang 1 m2 lantai keramik warna ukuran (20x20) cm

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Keramik warna bh 26.500 4,200 111,300
Bahan PC kg 10.400 2,200 22,880
PP m3 0.045 223,400 10,053
Semen warna kg 1.620 4,500 7,290
Jumlah 151,523
Pekerja OH 0.700 95,000 66,500
Tenaga Kerja Tukang batu OH 0.350 130,500 45,675
Kepala tukang OH 0.035 150,000 5,250
Mandor OH 0.035 150,000 5,250
Jumlah 122,675
Nilai HSPK 274,198

XII.6.6.a Memasang 1 m2 Dinding keramik warna ukuran (20x25) cm


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Keramik warna bh 21.200 5,600 118,720
Bahan PC kg 9.300 2,200 20,460
PP m3 0.018 223,400 4,021
Semen warna kg 1.500 4,500 6,750
Jumlah 149,951
Pekerja OH 0.900 95,000 85,500
Tenaga Kerja Tukang batu OH 0.450 130,500 58,725
Kepala tukang OH 0.045 150,000 6,750
Mandor OH 0.045 150,000 6,750
Jumlah 157,725
Nilai HSPK 307,676
XII.6.6.c Memasang 1 m2 dinding keramik warna ukuran (25x40) cm
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Keramik warna bh 10.600 10,800 114,480
Bahan PC kg 10.400 2,200 22,880
PP m3 0.045 223,400 10,053
Semen warna kg 1.620 4,500 7,290
Jumlah 154,703
Pekerja OH 0.700 95,000 66,500
Tenaga Kerja Tukang batu OH 0.350 130,500 45,675
Kepala tukang OH 0.035 150,000 5,250
Mandor OH 0.035 150,000 5,250
Jumlah 122,675
Nilai HSPK 277,378

XIV. PEKERJAAN PENGECATAN


XIV.6.9. Pengecatan 1 m2 Bidang Kayu Baru (1 Lapis Plamir) 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Cat Meni kg 0.200 89,700 17,940
Bahan Plamir kg 0.150 54,000 8,100
Cat Dasar kg 0.170 23,000 3,910
Cat Penutup 2 kali kg 0.233 65,100 15,168
Jumlah 45,118
Pekerja OH 0.070 95,000 6,650
Tenaga Kerja Tukang cat OH 0.105 130,500 13,703
Kepala tukang OH 0.004 150,000 600
Mandor OH 0.0025 150,000 375
Jumlah 21,328
Nilai HSPK 66,446

XIV.6.14 Pengecatan 1 m2 Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup

Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Plamir kg 0.100 54,000 5,400
Bahan Cat Dasar kg 0.100 23,000 2,300
Cat Penutup 2 kali kg 0.260 26,100 6,786
Jumlah 14,486
Pekerja OH 0.020 95,000 1,900
Tenaga Kerja Tukang cat OH 0.063 130,500 8,222
Kepala tukang OH 0.006 150,000 945
Mandor OH 0.0025 150,000 375
Jumlah 11,442
Nilai HSPK 27,476
6. HSPK JALAN RABAT BETON, DRAINASE LINGKUNGAN DAN PAVING BLOCK

II. PEKERJAAN TANAH

II.6.1. Menggali 1 m3 tanah biasa sedalam 1 meter


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Tenaga Kerja Pekerja OH 0.750 95,000 71,250
Mandor OH 0.025 150,000 3,750
Nilai HSPK 75,000

II.6.11. Mengurug 1 m3 pasir urug


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan PU m3 1.200 169,600 203,520
Jumlah 203,520
Tenaga Kerja Pekerja OH 0.300 95,000 28,500
Mandor OH 0.010 150,000 1,500
Jumlah 30,000
Nilai HSPK 233,520

II.6.16. Mengurug 1 m3 tanah timbunan


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Tanah timbunan m3 1.200 129,600 155,520
Jumlah 155,520
Tenaga Kerja Pekerja OH 0.250 95,000 23,750
Mandor OH 0.025 150,000 3,750
Jumlah 27,500
Nilai HSPK 183,020

III. PEKERJAAN PONDASI

III.6.2. Memasang 1 m3 pondasi batu kali, campuran 1 PC : 4 PP


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Batu kali m3 1.200 265,200 318,240
Bahan PC kg 163.000 2,200 358,600
PP m3 0.520 223,400 116,168
Jumlah 793,008
Pekerja OH 1.500 95,000 142,500
Tenaga Kerja Tukang batu OH 0.750 130,500 97,875
Kepala tukang OH 0.075 150,000 11,250
Mandor OH 0.075 150,000 11,250
Jumlah 262,875
Nilai HSPK 1,055,883
V. PEKERJAAN PLESTERAN

V.6.2. Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan PC kg 10.224 2,200 22,493
PP m3 0.020 223,400 4,468
Jumlah 26,961
Pekerja OH 0.300 95,000 28,500
Tenaga Kerja Tukang batu OH 0.150 130,500 19,575
Kepala tukang OH 0.015 150,000 2,250
Mandor OH 0.015 150,000 2,250
Jumlah 52,575
Nilai HSPK 79,536

V.6.27. Memasang 1 m2 acian


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan PC kg 3.250 2,200 7,150
Jumlah 7,150
Pekerja OH 0.200 95,000 19,000
Tenaga Kerja Tukang batu OH 0.100 130,500 13,050
Kepala tukang OH 0.010 150,000 1,500
Mandor OH 0.010 150,000 1,500
Jumlah 35,050
Nilai HSPK 42,200

VI. PEKERJAAN BETON

VI.6.1. Membuat 1 m3 beton mutu f'_x001E_uc_x001F_=7,4 MPa (K 100), slump (12_x001E__x001E__+_x001F__x001F_2) cm, w/c = 0,87
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
PC kg 247.000 2,200 543,400
Bahan PB kg 869.000 133 115,143
KR (maksimum 30 mm) kg 999.000 165 165,316
Air ltr 215.000 38 8,170
Jumlah 832,029
Pekerja OH 1.650 95,000 156,750
Tenaga Kerja Tukang batu OH 0.275 130,500 35,888
Kepala tukang OH 0.028 150,000 4,200
Mandor OH 0.083 150,000 12,450
Jumlah 209,288
Nilai HSPK 1,041,317
VI.6.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Besi beton (polos/ulir) kg 10.500 27,500 288,750
Kawat beton kg 0.150 27,500 4,125
Jumlah 292,875
Pekerja OH 0.070 95,000 6,650
Tenaga Kerja Tukang besi OH 0.070 130,500 9,135
Kepala tukang OH 0.007 150,000 1,050
Mandor OH 0.004 150,000 600
Jumlah 17,435
Nilai HSPK 310,310
per kg 31,031

VI.6.24. Memasang 1 m2 begisting untuk plat lantai


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Kayu kelas IV m3 0.040 4,759,500 190,380
Paku 5 cm - 12 cm kg 0.400 26,300 10,520
Bahan Minyak begisting ltr 0.200 17,400 3,480
Balok kayu kelas III m3 0.015 6,881,200 103,218
Playwood tebal 9 mm lbr 0.350 272,100 95,235
Dolken kayu galam ø (8-1 btg 6.000 60,900 365,400
Jumlah 768,233
Pekerja OH 0.660 95,000 62,700
Tenaga Kerja Tukang kayu OH 0.330 130,500 43,065
Kepala tukang OH 0.033 150,000 4,950
Mandor OH 0.033 150,000 4,950
Jumlah 115,665
Nilai HSPK 883,898
1 x pakai 883,898

VI.6.37. Membuat 1 m2 Paving Block


Harga Satuan
Kebutuhan Satuan KOEF. Bahan / Upah Jumlah
(Rp) (Rp)
Paving Block bh 44.000 5,200 228,800
Bahan Pasir Dasar m3 0.050 169,600 8,480
Pasir Halus (pengunci) m3 0.005 223,400 1,117
Jumlah 238,397
Tenaga Kerja Pembantu Tukang OH 0.025 105,000 2,625
Mandor OH 0.025 150,000 3,750
Jumlah 6,375
Nilai HSPK 244,772
5. HSPK AIR BERSIH PIPA PVC DAN PIPA GIP

II. PEKERJAAN TANAH

II.6.1. Menggali 1 m3 tanah biasa sedalam 1 meter

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Tenaga Kerja Pekerja OH 0.750 95,000 71,250
Mandor OH 0.025 150,000 3,750
Nilai HSPK 75,000

X. PEKERJAAN PIPA

X.6.19.c Memasang 1 M' Pipa Galvanis dia. 1,50"

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa Galvanis m' 1.200 116,849 140,219
Perlengkapan 15% Harga Pipa - 0.150 116,849 17,527
Jumlah 157,746
Pekerja OH 0.1080 95,000 10,260
Tenaga Kerja Tukang OH 0.1800 130,500 23,490
Kepala tukang OH 0.0180 150,000 2,700
Mandor OH 0.0054 150,000 810
Jumlah 37,260
Nilai HSPK 195,006

X.6.19.d Memasang 1 M' Pipa Galvanis dia. 2"

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa Galvanis m' 1.200 137,836 165,403
Perlengkapan 15% Harga Pipa - 0.150 137,836 20,675
Jumlah 186,078
Pekerja OH 0.1080 95,000 10,260
Tenaga Kerja Tukang OH 0.1800 130,500 23,490
Kepala tukang OH 0.0180 150,000 2,700
Mandor OH 0.0054 150,000 810
Jumlah 37,260
Nilai HSPK 223,338
X.6.19.e Memasang 1 M' Pipa Galvanis dia. 2,5"

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa Galvanis m' 1.200 201,999 242,399
Perlengkapan 15% Harga Pipa - 0.150 201,999 30,300
Jumlah 272,699
Pekerja OH 0.1080 95,000 10,260
Tenaga Kerja Tukang OH 0.1800 130,500 23,490
Kepala tukang OH 0.0180 150,000 2,700
Mandor OH 0.0054 150,000 810
Jumlah 37,260
Nilai HSPK 309,959

X.6.19.f Memasang 1 M' Pipa Galvanis dia. 3"

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa Galvanis m' 1.200 238,289 285,947
Perlengkapan 15% Harga Pipa - 0.150 238,289 35,743
Jumlah 321,690
Pekerja OH 0.1080 95,000 10,260
Tenaga Kerja Tukang OH 0.1800 130,500 23,490
Kepala tukang OH 0.0180 150,000 2,700
Mandor OH 0.0054 150,000 810
Jumlah 37,260
Nilai HSPK 358,950

X.6.19.g Memasang 1 M' Pipa Galvanis dia. 4"

Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa Galvanis m' 1.200 308,628 370,354
Perlengkapan 15% Harga Pipa - 0.150 308,628 46,294
Jumlah 416,648
Pekerja OH 0.1350 95,000 12,825
Tenaga Kerja Tukang OH 0.2250 130,500 29,363
Kepala tukang OH 0.0225 150,000 3,375
Mandor OH 0.0068 150,000 1,020
Jumlah 46,583
Nilai HSPK 463,231
X.6.25.a Memasang 1 M' Pipa PVC Type AW dia. 3/4"
Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 9,947 11,936
Perlengkapan 12% Harga Pipa - 0.120 9,947 1,194
Jumlah 13,130
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0060 130,500 783
Kepala tukang OH 0.0018 150,000 270
Mandor OH 0.0018 150,000 270
Jumlah 4,743
Nilai HSPK 17,873

X.6.25.b Memasang 1 M' Pipa PVC Type AW dia. 1"


Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 13,663 16,396
Perlengkapan 12% Harga Pipa - 0.120 13,663 1,640
Jumlah 18,036
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0600 130,500 7,830
Kepala tukang OH 0.0060 150,000 900
Mandor OH 0.0018 150,000 270
Jumlah 12,420
Nilai HSPK 30,456

X.6.25.d Memasang 1 M' Pipa PVC Type AW dia. 1,5"


Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah Jumlah
(Rp) (Rp)
Bahan Pipa PVC m' 1.200 23,501 28,201
Perlengkapan 12% Harga Pipa - 0.120 23,501 2,820
Jumlah 31,021
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0600 130,500 7,830
Kepala tukang OH 0.0060 150,000 900
Mandor OH 0.0018 150,000 270
Jumlah 12,420
Nilai HSPK 43,441
X.6.25.e Memasang 1 M' Pipa PVC Type AW dia. 2"
Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah (Rp) Jumlah (Rp)

Bahan Pipa PVC m' 1.200 30,059 36,071


Perlengkapan 12% Harga Pipa - 0.120 30,059 3,607
Jumlah 39,678
Pekerja OH 0.0540 95,000 5,130
Tenaga Kerja Tukang OH 0.0900 130,500 11,745
Kepala tukang OH 0.0090 150,000 1,350
Mandor OH 0.0027 150,000 405
Jumlah 18,630
Nilai HSPK 58,308

X.6.25.f Memasang 1 M' Pipa PVC Type AW dia. 2,5"


Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah (Rp) Jumlah (Rp)

Bahan Pipa PVC m' 1.200 43,941 52,729


Perlengkapan 12% Harga Pipa - 0.120 43,941 5,273
Jumlah 58,002
Pekerja OH 0.0360 95,000 3,420
Tenaga Kerja Tukang OH 0.0600 130,500 7,830
Kepala tukang OH 0.0060 150,000 900
Mandor OH 0.0018 150,000 270
Jumlah 12,420
Nilai HSPK 70,422

X.6.25.g Memasang 1 M' Pipa PVC Type AW dia. 3"


Harga Satuan
Kebutuhan Satuan Indeks Bahan / Upah (Rp) Jumlah (Rp)

Bahan Pipa PVC m' 1.200 59,244 71,093


Perlengkapan 12% Harga Pipa - 0.120 59,244 7,109
Jumlah 78,202
Pekerja OH 0.0810 95,000 7,695
Tenaga Kerja Tukang OH 0.1250 130,500 16,313
Kepala tukang OH 0.1350 150,000 20,250
Mandor OH 0.0041 150,000 615
Jumlah 44,873
Nilai HSPK 123,075

X.6.25.h Memasang 1 M' Pipa PVC Type AW dia. 4"

Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah (Rp) Jumlah (Rp)

Bahan Pipa PVC m' 1.200 98,267 117,920


Perlengkapan 12% Harga Pipa - 0.120 98,267 11,792
Jumlah 129,712
Pekerja OH 0.0810 95,000 7,695
Tenaga Kerja Tukang OH 0.1350 130,500 17,618
Kepala tukang OH 0.1350 150,000 20,250
Mandor OH 0.0041 150,000 615
Jumlah 46,178
Nilai HSPK 175,890
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Membuat Parit (Menggunakan Buruh) 1 m3


Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.027 set 112,900.00 3,010.67
Jumlah : 3,010.67
Upah :
Mandor 0.019 Orang Hari 150,000.00 2,777.78
Buruh tak terampil 0.667 Orang Hari 86,000.00 57,333.33
Jumlah : 60,111.11
Nilai HSPK : 63,121.78

Membuat Parit (Menggunakan Alat) 1 m3


Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.002 set 112,900.00 180.64
Jumlah : 180.64
Sewa Alat :
Excavator 0.015 hari 668,313.66 10,024.70
Jumlah : 10,024.70
Upah :
Mandor 0.003 Orang Hari 150,000.00 375.00
Operator Terlatih 0.003 Orang Hari 166,700.00 416.75
Pembantu Operator 0.003 Orang Hari 100,000.00 250.00
Buruh tak terampil 0.040 Orang Hari 86,000.00 3,440.00
Jumlah : 4,481.75
Nilai HSPK : 14,687.09

Galian Tanah Untuk Konstruksi (Menggunakan


Buruh) 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.030 set 112,900.00 3,387.00
Jumlah : 3,387.00
Upah :
Mandor 0.025 Orang Hari 150,000.00 3,750.00
Buruh tak terampil 0.750 Orang Hari 86,000.00 64,500.00
Jumlah : 68,250.00
Nilai HSPK : 71,637.00

Pengurugan Kembali Dan Dipadatkan


(Menggunakan Buruh) 1 m3
Bahan/Material :
Timbunan Pilihan 1.333 m3 115,700.00 154,266.67
Alat bantu ( set @ 3 alat ) 0.027 set 112,900.00 3,010.67
Jumlah : 157,277.34
Upah :
Mandor 0.067 Orang Hari 150,000.00 10,000.00
Buruh tak terampil 0.667 Orang Hari 86,000.00 57,333.33
Buruh Terampil 0.200 Orang Hari 97,800.00 19,560.00
Jumlah : 86,893.33
Nilai HSPK : 244,170.67
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Galian Tanah Dan Pembuangan (Menggunakan


Buruh) 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.045 set 112,900.00 5,080.50
Jumlah : 5,080.50
Upah :
Mandor 0.031 Orang Hari 150,000.00 4,687.50
Buruh tak terampil 1.125 Orang Hari 86,000.00 96,750.00
Jumlah : 101,437.50
Nilai HSPK : 106,518.00

Galian Tanah Dan Pembuangan (Menggunakan


Alat) 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112,900.00 135.48
Jumlah : 135.48
Sewa Alat :
Excavator 0.025 hari 668,313.66 16,707.84
Dump Truk 5 ton/145 HP 0.050 hari 543,570.69 27,178.53
Jumlah : 43,886.37
Upah :
Mandor 0.005 Orang Hari 150,000.00 750.00
Operator terlatih 0.005 Orang Hari 166,700.00 833.50
Pembantu operator 0.005 Orang Hari 100,000.00 500.00
Supir terlatih 0.020 Orang Hari 166,600.00 3,332.00
Pembantu Supir 0.020 Orang Hari 100,000.00 2,000.00
Buruh tak terlatih 0.030 Orang Hari 86,000.00 2,580.00
Jumlah : 9,995.50
Nilai HSPK : 54,017.35

Galian Tanah Dan Pembuangan (Menggunakan


Alat) 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112,900.00 135.48
Jumlah : 135.48
Sewa Alat :
Excavator 0.025 hari 668,313.66 16,707.84
Jumlah : 16,707.84
Upah :
Mandor 0.005 Orang Hari 150,000.00 750.00
Operator terlatih 0.005 Orang Hari 166,700.00 833.50
Pembantu operator 0.005 Orang Hari 100,000.00 500.00
Buruh tak terlatih 0.030 Orang Hari 86,000.00 2,580.00
Jumlah : 4,663.50
Nilai HSPK : 21,506.82
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Pembersihan Semak Dll Pada Bahu Jalan


(Menggunakan Buruh) 1 m2
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112,900.00 75.27
Jumlah : 75.27
Upah :
Mandor 0.001 Orang Hari 150,000.00 100.00
Buruh tak terampil 0.017 Orang Hari 86,000.00 1,433.33
Jumlah : 1,533.33
Nilai HSPK : 1,608.60

Pembersihan Parit (Menggunakan Buruh) 1m


Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.003 set 112,900.00 325.15
Jumlah : 325.15
Sewa Alat :
Dump Truk 5 ton/145 HP 0.020 hari 543,570.69 10,871.41
Jumlah : 10,871.41
Upah :
Mandor 0.002 Orang Hari 150,000.00 300.00
Supir terlatih 0.004 Orang Hari 166,600.00 666.40
Pembantu Supir 0.004 Orang Hari 100,000.00 400.00
Buruh tak terlatih 0.072 Orang Hari 86,000.00 6,192.00
Jumlah : 7,558.40
Nilai HSPK : 18,754.96

Lapis Pondasi Bawah Klas C Sirtu


(Menggunakan Buruh) 1 m3
Bahan/Material :
Base C sampai di lokasi 1.200 m3 237,300.00 284,760.00
Alat bantu ( set @ 3 alat ) 0.040 set 112,900.00 4,516.00
Jumlah : 289,276.00
Sewa Alat :
Mesin Gilas 3 roda 6- 8 ton 0.083 hari 242,961.92 20,246.83
Truck tangki air 115 HP 0.083 hari 371,771.66 30,980.97
Jumlah : 51,227.80
Upah :
Mandor 0.033 Orang Hari 150,000.00 5,000.00
Operator terlatih 0.017 Orang Hari 166,700.00 2,778.33
Pembantu operator 0.017 Orang Hari 100,000.00 1,666.67
Supir terlatih 0.017 Orang Hari 166,600.00 2,776.67
Pembantu Supir 0.017 Orang Hari 100,000.00 1,666.67
Buruh tak terlatih 1.000 Orang Hari 86,000.00 86,000.00
Jumlah : 99,888.34
Nilai HSPK : 440,392.14
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Lapis Pondasi Bawah Konstruksi Telford


(Menggunakan Buruh) 1 m3
Bahan/Material :
Batu belah 10-15 cm (Manual) 0.625 m3 263,000.00 164,375.00
Batu belah 5 - 7 cm (Manual) 0.250 m3 299,300.00 74,825.00
Pasir Urug (lokasi kerja) 0.375 m3 154,200.00 57,825.00
Alat bantu ( set @ 3 alat ) 0.040 set 112,900.00 4,516.00
Jumlah : 301,541.00
Sewa Alat :
Mesin Gilas 3 roda 6-8 ton 0.063 hari 242,961.92 15,185.12
Jumlah : 15,185.12
Upah :
Mandor 0.025 Orang Hari 150,000.00 3,750.00
Operator terlatih 0.013 Orang Hari 166,700.00 2,083.75
Pembantu operator 0.013 Orang Hari 100,000.00 1,250.00
Buruh tak terlatih 1.000 Orang Hari 86,000.00 86,000.00
Jumlah : 93,083.75
Nilai HSPK : 409,809.87

Lapis Penetrasi / Permukaan Macadam 50 mm


Lapen (Menggunakan Buruh) 1 m2
Bahan/Material :
Batu pecah 3-5 cm 0.040 m3 353,400.00 14,136.00
Batu Pecah 2-3 cm Stone Cruisher 0.022 m3 408,000.00 9,066.34
Batu pecah 1-2 cm Stone Cruisher 0.011 m3 485,800.00 5,395.85
Batu pecah 0,5 - 1 (Mata Ayam Manual) 0.005 m3 538,700.00 2,693.50
Pasir ayak untuk beton 0.003 m3 168,600.00 421.50
Aspal 4.400 kg 12,900.00 56,760.00
Alat bantu ( set @ 3 alat ) 0.006 set 112,900.00 658.05
Jumlah : 89,131.24
Sewa Alat :
Mesin Gilas 3 roda 6 - 8 ton 0.011 hari*3 242,961.92 2,603.16
Mesin Penyemprot Aspal 0.011 hari*3 81,659.95 874.93
Dump truk (3,5 t on/ 115 HP) 0.011 hari*3 394,602.79 4,227.89
Jumlah : 7,705.98
Upah :
Mandor 0.004 Orang Hari*3 150,000.00 642.86
Operator terlatih 0.004 Orang Hari*3 166,700.00 714.43
Supir terlatih 0.002 Orang Hari*3 100,000.00 214.29
Pembantu Supir 0.002 Orang Hari*3 166,600.00 357.00
Buruh tak terlatih 0.124 Orang Hari*3 100,000.00 12,428.57
Buruh terlatih 0.004 Orang Hari*3 86,000.00 368.57
Jumlah : 14,725.72
Nilai HSPK : 111,562.94
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Konstruksi Pasangan Batu (Menggunakan


Buruh) 1 m3
Bahan/Material :
Batu kali 1.000 m3 241,100.00 241,100.00
Pasir ayak untuk beton 0.250 m3 168,600.00 42,150.00
Semen (dilokasi kerja) 3.800 zak 100,000.00 380,000.00
Alat bantu (set @ 3 alat) 0.150 set 112,900.00 16,935.00
Jumlah : 680,185.00
Sewa Alat :
Pompa air (Ø 5 cm) - 30 m3 / jam 0.400 hari 40,068.29 16,027.32
Jumlah : 16,027.32
Upah :
Kepala tukang 0.200 Orang Hari 150,000.00 30,000.00
Tukang 0.800 Orang Hari 130,500.00 104,400.00
Buruh tak terlatih 2.400 Orang Hari 86,000.00 206,400.00
Jumlah : 340,800.00
Nilai HSPK : 1,037,012.32

Acuan Untuk Beton Struktur (Menggunakan


Buruh) 1 m2
Bahan/Material :
Paku Jembatan 0.200 kg 23,900.00 4,780.00
Kayu acuan 0.030 m3 4,725,000.00 141,750.00
Alat bantu (set 3 @ alat) 0.028 set 112,900.00 3,161.20
Jumlah : 149,691.20
Upah :
Kepala tukang 0.050 Orang Hari 150,000.00 7,500.00
Tukang 0.200 Orang Hari 130,500.00 26,100.00
Buruh tak terlatih 0.350 Orang Hari 86,000.00 30,100.00
Buruh semi terlatih 0.150 Orang Hari 97,800.00 14,670.00
Jumlah : 78,370.00
Nilai HSPK : 228,061.20

Memotong, Membengkok Dan Memasang


Tulangan Besi Beton (Menggunakan Buruh) 1 m3
Bahan/Material :
Baja tulangan beton 1.125 kg 25,300.00 28,462.50
Alat bantu (set 3 @ alat) 0.001 set 112,900.00 67.74
Jumlah : 28,530.24
Upah :
Mandor 0.005 Orang Hari 150,000.00 750.00
Kepala tukang 0.005 Orang Hari 150,000.00 750.00
Buruh tak terlatih 0.015 Orang Hari 86,000.00 1,290.00
Buruh terlatih 0.005 Orang Hari 136,000.00 680.00
Jumlah : 3,470.00
Nilai HSPK : 32,000.24
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Beton Massa Klas K125 ( Menggunakan Alat


Pengaduk Beton 125 Liter ) 1 m3
Bahan/Material :
Pasir ayak untuk beton 0.522 m3 168,600.00 87,965.22
Semen 6.261 zak 100,000.00 626,086.96
Alat bantu (set 3 @ alat) 0.083 set 112,900.00 9,424.70
Batu sungai pecah tersaring 0.696 m3 1,036,773.04 721,233.42
Jumlah : 1,444,710.30
Sewa Alat :
Alat penggetar beton 4 HP 1.043 hari*4 13,954.43 14,561.14
Pengaduk beton 125 Ltr 6HP 1.043 hari*4 57,083.92 59,565.83
Pompa air (Ø 5 cm) - 30 m3 / jam 0.348 hari*4 40,068.29 13,936.80
Jumlah : 88,063.77
Upah :
Mandor 0.174 Orang Hari*4 150,000.00 26,086.96
Buruh tak terlatih 2.087 Orang Hari*4 86,000.00 179,478.26
Buruh terlatih 0.348 Orang Hari*4 136,000.00 47,304.35
Jumlah : 252,869.57
Nilai HSPK : 1,785,643.64

Beton Massa Klas K175 ( Menggunakan Alat


Pengaduk Beton 125 Liter ) 1 m3
Bahan/Material :
Pasir ayak untuk beton 0.521 m3 168,600.00 87,812.50
Semen 7.500 zak 100,000.00 750,000.00
Alat bantu (set 3 @ alat) 0.080 set 112,900.00 9,032.00
Batu sungai pecah tersaring 0.729 m3 1,036,773.04 755,980.34
Jumlah : 1,602,824.84
Sewa Alat :
Alat penggetar beton 4 HP 1.000 hari*4 13,954.43 13,954.43
Pengaduk beton 125 Ltr 6HP 1.000 hari*4 57,083.92 57,083.92
Pompa air (Ø 5 cm) - 30 m3 / jam 0.333 hari*4 40,068.29 13,356.10
Jumlah : 84,394.45
Upah :
Mandor 0.167 Orang Hari*4 150,000.00 25,000.00
Buruh tak terlatih 2.000 Orang Hari*4 86,000.00 172,000.00
Buruh terlatih 0.333 Orang Hari*4 136,000.00 45,333.33
Jumlah : 242,333.33
Nilai HSPK : 1,929,552.62
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Beton Cor Rabat ( Menggunakan Alat


Pengaduk Beton 125 Liter ) 1 m3
Bahan/Material :
Semen 7.500 zak 100,000.00 750,000.00
Alat bantu (set 3 @ alat) 0.080 set 112,900.00 9,032.00
Sirtu 0.729 m3 518,034.33 377,733.37
Jumlah : 1,136,765.37
Sewa Alat :
Pengaduk beton 125 Ltr 6HP 1.000 hari*4 57,083.92 57,083.92
Jumlah : 57,083.92
Upah :
Mandor 0.167 Orang Hari*4 150,000.00 25,000.00
Buruh tak terlatih 2.000 Orang Hari*4 86,000.00 172,000.00
Buruh terlatih 0.333 Orang Hari*4 136,000.00 45,333.33
Jumlah : 242,333.33
Nilai HSPK : 1,436,182.62

Beton Massa Klas K225 ( Menggunakan Alat


Pengaduk Beton 125 Liter ) 1 m3
Bahan/Material :
Pasir ayak untuk beton 0.486 m3 168,600.00 82,021.62
Semen 8.757 zak 100,000.00 875,675.68
Alat bantu (set 3 @ alat) 0.078 set 112,900.00 8,787.89
Batu sungai pecah tersaring 0.730 m3 1,036,773.04 756,564.11
Jumlah : 1,723,049.30
Sewa Alat :
Alat penggetar beton 4 HP 0.973 hari*6 13,954.43 13,577.28
Pengaduk beton 125 Ltr 6HP 0.973 hari*6 57,083.92 55,541.11
Pompa air (Ø 5 cm) - 30 m3 / jam 0.324 hari*6 40,068.29 12,995.12
Jumlah : 82,113.51
Upah :
Mandor 0.162 Orang Hari*6 150,000.00 24,324.32
Buruh tak terlatih 1.946 Orang Hari*6 86,000.00 167,351.35
Buruh terlatih 0.324 Orang Hari*6 136,000.00 44,108.11
Jumlah : 235,783.78
Nilai HSPK : 2,040,946.59

Asphalt Sosot ( Lapis Penutup Cor Rabat Beton


) 1 m3
Bahan/Material :
Aspal 0.500 m3 12,900.00 6,450.00
Pasir Ayak untuk Beton 0.010 zak 168,600.00 1,686.00
Minyak bakar 0.286 set 8,200.00 2,342.86
Alat bantu (set 3 @ alat) 0.004 m3 112,900.00 483.86
Jumlah : 10,962.72
Upah :
Mandor 0.001 Orang Hari 150,000.00 214.29
Buruh tak terlatih 0.071 Orang Hari 86,000.00 6,142.86
Jumlah : 6,357.15
Nilai HSPK : 17,319.87
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)

Plesteran, tebal 15 mm Camp. 1 : 4 1 m2


Bahan/Material :
Semen Portland 6.200 kg 2,000.00 12,400.00
Pasir Pasang 0.024 m3 203,100.00 4,874.40
Jumlah : 17,274.40
Upah :
Pekerja 0.300 Orang Hari 86,000.00 25,800.00
Mandor 0.015 Orang Hari 150,000.00 2,250.00
Tukang Batu 0.150 Orang Hari 130,500.00 19,575.00
Kepala Tukang 0.015 Orang Hari 150,000.00 2,250.00
Jumlah : 49,875.00
Nilai HSPK : 67,149.40
Bukaan Jalan Untuk Tanah Bukit
Galian Tanah Dan Pembuangan (Menggunakan
Alat) 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112900 135.48
Jumlah : 135.48
Sewa Alat :
Excavator 0.025 hari 668313.66 16707.84
Jumlah : 16707.84
Upah :
Mandor 0.005 Orang Hari 150000 750
Operator terlatih 0.005 Orang Hari 166700 833.5
Pembantu operator 0.005 Orang Hari 100000 500
Buruh tak terlatih 0.030 Orang Hari 86000 2580
Jumlah : 4663.5
Nilai HSPK : 21506.82

Pembersihan Semak Dll Pada Bahu Jalan (Meng 1 m2


Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112900 75.27
Jumlah : 75.27
Upah :
Mandor 0.001 Orang Hari 150000 100
Buruh tak terampil 0.017 Orang Hari 86000 1433.33
Jumlah : 1533.33
Nilai HSPK : 1608.6
Bukaan Jalan Untuk Tanah Datar
Galian Tanah Dan Pembuangan (Menggunakan A 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112900 135.48
Jumlah : 135.48
Sewa Alat :
Excavator 0.025 hari 668313.66 16707.84
Jumlah : 16707.84
Upah :
Mandor 0.005 Orang Hari 150000 750
Operator terlatih 0.005 Orang Hari 166700 833.5
Pembantu operator 0.005 Orang Hari 100000 500
2. HSPK JALAN (ANALISA K)

HARGA SATUAN
KODE URAIAN KEGIATAN KOEF. SATUAN HARGA (Rp.) KETERANGAN
(Rp.)
Buruh tak terlatih 0.030 Orang Hari 86000 2580
Jumlah : 4663.5
Nilai HSPK : 21506.82

Pembersihan Semak Dll Pada Bahu Jalan (Meng 1 m2


Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.001 set 112900 75.27
Jumlah : 75.27
Upah :
Mandor 0.001 Orang Hari 150000 100
Buruh tak terampil 0.017 Orang Hari 86000 1433.33
Jumlah : 1533.33
Nilai HSPK : 1608.6

Galian Tanah Dan Pembuangan (Menggunakan


Alat) 1 m3
Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.0012 set 112900 135.48
Jumlah : 135.48
Sewa Alat :
Excavator 0.0250 hari 668313.66 16707.84
Jumlah : 16707.84
Upah :
Mandor 0.0050 Orang Hari 150000 750
Operator terlatih 0.0050 Orang Hari 166700 833.5
Pembantu operator 0.0050 Orang Hari 100000 500
Buruh tak terlatih 0.0300 Orang Hari 86000 2580
Jumlah : 4663.5
Nilai HSPK : 21506.82

Pembersihan Semak Dll Pada Bahu Jalan (Meng 1 m2


Bahan/Material :
Alat bantu ( set @ 3 alat ) 0.0007 set 112900 75.27
Jumlah : 75.27
Upah :
Mandor 0.0007 Orang Hari 150000 100
Buruh tak terampil 0.0167 Orang Hari 86000 1433.33
Jumlah : 1533.33
Nilai HSPK : 1608.6
HSPK JALAN ANALISA EI

HARGA SATUAN HARGA


KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Galian untuk Selokan Drainase dan Saluran


Air 1 m3
Sewa Alat :
Excavator 0.014 Jam 504,033.17 7,084.80
Dump Truck 3,5 ton 0.046 Jam 231,676.66 10,705.47
Alat Bantu 1.000 Ls 84,389.98 84,389.98
Jumlah : 102,180.25
Upah :
Pekerja 0.056 Jam 10,400.00 584.74
Mandor 0.014 Jam 17,600.00 247.39
Jumlah : 832.13
Jumlah Harga : 103,012.38
Nilai HSPK : 103,012.38

Pasangan Batu dengan Mortar 1 m3


Bahan/Material :
Batu 1.080 M3 241,100.00 260,388.00
Semen (PC) 161.000 kg 2,000.00 322,000.00
Pasir 0.483 M3 203,100.00 98,071.76
Jumlah : 680,459.76
Sewa Alat :
Conc. Mixer 0.402 Jam 63,422.73 25,470.98
Alat Bantu @3 set 1.000 Ls 126,584.97 126,584.97
Jumlah : 152,055.95
Upah :

Pekerja 4.016 Jam 10,400.00 41,767.07


Tukang Batu 1.205 Jam 15,400.00 18,554.22
Mandor 0.402 Jam 17,600.00 7,068.27
Jumlah : 67,389.56
Jumlah Harga : 899,905.27
Nilai HSPK : 899,905.27
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Gorong-gorong Pipa Beton Bertulang,


diameter dalam 35 - 45 cm 1m
Bahan/Material :
Beton K-300 0.105 M3 2,615,581.33 275,067.12
Baja Tulangan 11.568 Kg 25,300.00 292,673.68
Urugan Porus 0.124 M3 167,362.08 20,736.16
Mat. Pilihan 0.813 M3 19,800.00 16,093.24
Jumlah : 604,570.20
Sewa Alat :
Tamper 1.009 Jam 41,595.93 41,975.31
Flat Bed Truck 0.273 Jam 271,601.80 74,225.87
Alat Bantu 1.000 Ls - -
Jumlah : 116,201.18
Upah :

Pekerja 2.333 Jam 10,400.00 24,266.67


Tukang 0.933 Jam 15,400.00 14,373.33
Mandor 0.467 Jam 17,600.00 8,213.33
Jumlah : 46,853.33
Jumlah Harga : 767,624.71
Nilai HSPK : 767,624.71

Gorong-gorong Pipa Beton Bertulang,


diameter 55 - 65 cm 1m
Bahan/Material :
Beton K-300 0.146 M3 2,615,581.33 381,889.31
Baja Tulangan 16.061 Kg 25,300.00 406,333.36
Urugan Porus 0.145 M3 167,362.08 24,250.76
Mat. Pilihan 1.063 M3 19,800.00 21,047.20
Jumlah : 833,520.63
Sewa Alat :
Tamper 1.316 Jam 41,595.93 54,724.71
Flat Bed Truck 0.410 Jam 271,601.80 111,338.80
Alat Bantu 1.000 Ls - -
Jumlah : 166,063.51
Upah :

Pekerja 4.900 Jam 10,400.00 50,960.00


Tukang 1.400 Jam 15,400.00 21,560.00
Mandor 0.700 Jam 17,600.00 12,320.00
Jumlah : 84,840.00
Jumlah Harga : 1,084,424.14
Nilai HSPK : 1,084,424.14
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Gorong-gorong Pipa Beton Bertulang,


diameter dalam 75 - 85 cm 1m
Bahan/Material :
Beton K-300 0.290 M3 2,615,581.33 757,821.23
Baja Tulangan 31.871 Kg 25,300.00 806,328.00
Urugan Porus 0.310 M3 167,362.08 51,928.27
Mat. Pilihan 1.911 M3 19,800.00 37,844.78
Jumlah : 1,653,922.28
Sewa Alat :
Tamper 2.378 Jam 41,595.93 98,898.46
Flat Bed Truck 1.025 Jam 271,601.80 278,347.01
Alat Bantu 1.000 Ls - -
Jumlah : 377,245.47
Upah :

Pekerja 14.000 Jam 10,400.00 145,600.00


Tukang 1.750 Jam 15,400.00 26,950.00
Mandor 1.750 Jam 17,600.00 30,800.00
Jumlah : 203,350.00
Jumlah Harga : 2,234,517.75
Nilai HSPK : 2,234,517.75

Gorong-gorong Pipa Beton Bertulang,


diameter dalam 75 - 85 cm 1m
Bahan/Material :
Beton K-300 0.408 M3 2,615,581.33 1,068,221.84
Baja Tulangan 44.925 Kg 25,300.00 1,136,596.81
Urugan Porus 0.416 M3 167,362.08 69,589.15
Mat. Pilihan 2.310 M3 19,800.00 45,738.00
Jumlah : 2,320,145.80
Sewa Alat :
Tamper 2.883 Jam 41,595.93 119,934.60
Flat Bed Truck 1.025 Jam 271,601.80 278,347.01
Alat Bantu 1.000 Ls - -
Jumlah : 398,281.61
Upah :
Pekerja 14.000 Jam 10,400.00 145,600.00
Tukang 1.750 Jam 15,400.00 26,950.00
Mandor 1.750 Jam 17,600.00 30,800.00
Jumlah : 203,350.00
Jumlah Harga : 2,921,777.41
Nilai HSPK : 2,921,777.41
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Galian Biasa 1 m3
Sewa Alat :
Excavator 0.048 Jam 504,033.17 23,953.38
Dump Truck 3,5 ton 0.339 Jam 231,676.66 78,442.96
Alat Bantu 1.000 Ls - -
Jumlah : 102,396.34

Upah :
Pekerja 0.095 Jam 10,400.00 988.49
Mandor 0.048 Jam 17,600.00 836.41
Jumlah : 1,824.90
Jumlah Harga : 104,221.24
Nilai HSPK : 104,221.24

Galian Biasa (Pembuangan Setempat) 1 m3


Sewa Alat :
Excavator 0.048 Jam 504,033.17 23,953.38
Dump Truck 3,5 ton 0.000 Jam - -
Alat Bantu 1.000 Ls - -
Jumlah : 23,953.38

Upah :
Pekerja 0.095 Jam 10,400.00 988.49
Mandor 0.048 Jam 17,600.00 836.41
Jumlah : 1,824.90
Jumlah Harga : 25,778.28
Nilai HSPK : 25,778.28

Galian Struktur dengan kedalaman 0 - 2


meter 1 m3
Bahan/Material :
Urugan Pilihan 0.500 M3 51,357.22 25,678.61
Jumlah : 25,678.61
Sewa Alat :
Excavator 0.010 Jam 504,033.17 4,858.15
Bulldozer 0.015 Jam 637,304.37 9,242.48
Alat bantu 1.000 Ls - -
Jumlah : 14,100.63

Upah :
Pekerja 0.039 Jam 10,400.00 400.96
Mandor 0.010 Jam 17,600.00 169.64
Jumlah : 570.60
Jumlah Harga : 40,349.84
Nilai HSPK : 40,349.84
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Galian Struktur dengan kedalaman 2 - 4


meter 1 m3
Bahan/Material :
Urugan Pilihan 1.000 M3 51,357.22 51,357.22
Bahan pengaman tebing galian 1.000 Ls 1,278,990.00 1,278,990.00
Jumlah : 1,330,347.22
Sewa Alat :
Excavator 0.011 Jam 504,033.17 5,397.95
Bulldozer 0.015 Jam 637,304.37 9,242.48
Alat bantu 1.000 Ls - -
Jumlah : 14,640.43

Upah :
Pekerja 0.107 Jam 10,400.00 1,113.79
Mandor 0.011 Jam 17,600.00 188.49
Jumlah : 1,302.28
Jumlah Harga : 1,346,289.93
Nilai HSPK : 1,346,289.93

Galian Struktur dengan kedalaman 4 - 6


meter 1 m3
Bahan/Material :
Urugan Pilihan 0.600 M3 51,357.22 30,814.33
Bahan pengaman tebing galian 1.000 Ls 1,278,990.00 1,278,990.00
Jumlah : 1,309,804.33
Sewa Alat :
Excavator 0.016 Jam 504,033.17 8,096.92
Bulldozer 0.015 Jam 637,304.37 9,242.48
Alat bantu 1.000 Ls - -
Jumlah : 17,339.40
Upah :
Pekerja 0.193 Jam 10,400.00 2,004.82
Mandor 0.016 Jam 17,600.00 282.73
Jumlah : 2,287.55
Jumlah Harga : 1,329,431.28
Nilai HSPK : 1,329,431.28
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Timbunan Biasa Dari Sumber Galian 1 m3


Bahan/Material :
Bahan timbunan (M08) 1.110 Ls 117,800.00 130,758.00
Jumlah : 130,758.00
Sewa Alat :
Excavator 0.019 Jam 504,033.17 9,446.40
Dump Truck 3,5 ton 0.565 Jam 231,676.66 130,834.37
Motor Grader 0.004 Jam 627,762.91 2,347.40
Vibro Roller 0.004 Jam 332,389.22 1,390.52
Water tank truck 0.007 Jam 186,855.34 1,313.24
Alat Bantu 1.000 Ls - -
Jumlah : 145,331.93

Upah :
Pekerja 0.075 Jam 10,400.00 779.65
Mandor 0.019 Jam 17,600.00 329.85
Jumlah : 1,109.50
Jumlah Harga : 277,199.43
Nilai HSPK : 277,199.43

Timbunan Biasa Dari Sumber Galian 1 m3


Sewa Alat :
Excavator 0.049 Jam 504,033.17 24,740.58
Dump Truck 3,5 ton 0.539 Jam 231,676.66 124,820.95
Motor Grader 0.004 Jam 627,762.91 2,347.40
Vibro Roller 0.004 Jam 332,389.22 1,390.52
Water tank truck 0.007 Jam 186,855.34 1,313.24
Alat Bantu 1.000 Ls - -
Jumlah : 154,612.69

Upah :
Pekerja 0.196 Jam 10,400.00 2,041.95
Mandor 0.049 Jam 17,600.00 863.90
Jumlah : 2,905.85
Jumlah Harga : 157,518.54
Nilai HSPK : 157,518.54
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Timbunan Biasa Dari Sumber Galian 1 m3


Bahan/Material :
Bahan pilihan (M09) 1.110 Ls 19,800.00 21,978.00
Jumlah : 21,978.00
Sewa Alat :
Wheel Loader 0.009 Jam 511,986.21 4,354.24
Dump Truck 3,5 ton 0.550 Jam 231,676.66 127,416.03
Motor Grader 0.004 Jam 627,762.91 2,491.12
Tandem 0.016 Jam 209,863.46 3,379.75
Water Tanker 0.007 Jam 186,855.34 1,313.24
Alat Bantu 1.000 Ls - -
Jumlah : 138,954.38

Upah :
Pekerja 2.200 Jam 10,400.00 22,878.90
Mandor 0.550 Jam 17,600.00 9,679.53
Jumlah : 32,558.43
Jumlah Harga : 193,490.81
Nilai HSPK : 193,490.81

Timbunan Biasa Dari Sumber Galian 1 m3


Sewa Alat :
Wheel Loader 0.009 Jam 511,986.21 4,354.24
Dump Truck 3,5 ton 0.137 Jam 231,676.66 31,714.82
Motor Grader 0.004 Jam 627,762.91 2,491.12
Tandem 0.016 Jam 209,863.46 3,379.75
Water Tanker 0.007 Jam 186,855.34 1,313.24
Alat Bantu 1.000 Ls - -
Jumlah : 43,253.17

Upah :
Pekerja 0.548 Jam 10,400.00 5,694.73
Mandor 0.137 Jam 17,600.00 2,409.31
Jumlah : 8,104.04
Jumlah Harga : 51,357.21
Nilai HSPK : 51,357.21

Pembersihan dan Pengupasan Lahan 1 m3


Sewa Alat :
Dump Truck 5 ton 0.004 Jam 279,743.30 1,123.47
Jumlah : 1,123.47
Upah :
Pekerja 0.070 Jam 10,400.00 728.00
Mandor 0.014 Jam 17,600.00 246.40
Jumlah : 974.40
Jumlah Harga : 2,097.87
Nilai HSPK : 2,097.87
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Lapis Pondasi Agregat Kelas A 1 m3


Bahan/Material :
Aggrgat A 1.259 Ls 323,276.34 406,878.60
Jumlah : 406,878.60
Sewa Alat :
Wheel Loader 0.008 Jam 511,986.21 4,349.44
Dump Truck 3,5 ton 2.072 Jam 231,676.66 480,059.85
Motor Grader 0.004 Jam 627,762.91 2,673.93
Tandem Roller 0.013 Jam 209,863.46 2,809.42
Water Tanker 0.014 Jam 186,855.34 2,626.48
Alat Bantu 1.000 Ls - -
Jumlah : 492,519.12
Upah :
Pekerja 0.059 Jam 10,400.00 618.45
Mandor 0.008 Jam 17,600.00 149.52
Jumlah : 767.97
Jumlah Harga : 900,165.69
Nilai HSPK : 900,165.69

Lapis Pondasi Agregat Kelas B 1 m3


Bahan/Material :
Aggrgat B 1.259 M3 312,635.90 393,486.44
Jumlah : 393,486.44
Sewa Alat :
Wheel Loader 0.008 Jam 511,986.21 4,349.44
Dump Truck 3,5 ton 1.997 Jam 231,676.66 462,708.29
Motor Grader 0.004 Jam 627,762.91 2,673.93
Tandem Roller 0.005 Jam 209,863.46 1,123.77
Water Tanker 0.014 Jam 186,855.34 2,626.48
Alat Bantu 1.000 Ls - -
Jumlah : 473,481.91

Upah :
Pekerja 0.059 Jam 10,400.00 618.45
Mandor 0.008 Jam 17,600.00 149.52
Jumlah : 767.97
Jumlah Harga : 867,736.32
Nilai HSPK : 867,736.32
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Lapis Pondasi Agregat Tanpa Penutup Aspal 1 m3


Bahan/Material :
Lps Pondasi Agr 1.259 M3 331,564.21 417,309.79
Jumlah : 417,309.79
Sewa Alat :
Wheel Loader 0.008 Jam 511,986.21 4,349.44
Dump Truck 1.997 Jam 231,676.66 462,708.29
Motor Grader 0.003 Jam 627,762.91 2,005.45
Tandem Vibro Roller 0.003 Jam 209,863.46 632.12
Water Tanker 0.014 Jam 186,855.34 2,626.48
Alat Bantu 1.000 Ls - -
Jumlah : 472,321.78
Upah :
Pekerja 0.059 Jam 10,400.00 618.45
Mandor 0.008 Jam 17,600.00 149.52
Jumlah : 767.97
Jumlah Harga : 890,399.54
Nilai HSPK : 890,399.54

Lapis Resap Pengikat - Aspal Cair Liter


Bahan/Material :
Aspal 0.679 Kg 12,900.00 8,758.79
Kerosene 0.371 liter 1,300.00 482.04
Jumlah : 9,240.83
Sewa Alat :
Asphalt Sprayer 0.000 Jam 66,020.07 13.75
Compressor 0.000 Ls 66,915.06 13.94
Jumlah : 27.69
Upah :
Pekerja 0.002 Jam 10,400.00 21.67
Mandor 0.000 Jam 17,600.00 7.33
Jumlah : 29.00
Jumlah Harga : 9,297.52
Nilai HSPK : 9,297.52

Lapis Perekat - Aspal Cair Liter


Bahan/Material :
Aspal 0.849 Kg 12,900.00 10,948.49
Kerosene 0.206 liter 1,300.00 267.80
Jumlah : 11,216.29
Sewa Alat :
Asphalt Sprayer 0.000 Jam 66,020.07 13.75
Compressor 0.000 Ls 66,915.06 13.94
Jumlah : 27.69

Upah :
Pekerja 0.002 Jam 10,400.00 21.67
Mandor 0.000 Jam 17,600.00 7.33
Jumlah : 29.00
Jumlah Harga : 11,272.98
Nilai HSPK : 11,272.98
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Laston Lapis Aus (AC-WC) tebal 4 cm Ton


Bahan/Material :
Lolos screen2 ukuran ( 9.5 - 19,0) 0.298 M3 299,300.00 89,145.03
Lolos screen2 ukuran ( 0 - 5) 0.352 M3 353,400.00 124,509.35
Semen 9.870 Kg 2,000.00 19,740.00
Aspal 62.830 Kg 11,970.00 752,075.10
Jumlah : 985,469.48
Sewa Alat :
Wheel Loader 0.010 Jam 511,986.21 4,900.41
AMP 0.040 Jam 2,706,944.20 108,712.62
Genset 0.040 Jam 76,006.93 3,052.49
Dump Truck 1.236 Jam 231,676.66 286,351.14
Asp. Finisher 0.014 Jam 305,434.93 4,196.24
Tandem Roller 0.014 Jam 209,863.46 2,838.18
P. Tyre Roller 0.006 Jam 375,047.22 2,176.19
Alat Bantu @3 set 1.000 Ls 126,584.97 126,584.97
Jumlah : 538,812.24

Upah :
Pekerja 0.402 Jam 10,400.00 4,176.71
Mandor 0.040 Jam 17,600.00 706.83
Jumlah : 4,883.54
Jumlah Harga : 1,529,165.26
Nilai HSPK : 1,529,165.26

Laston Lapis Aus (AC-WC) tebal 5 cm Ton


Bahan/Material :
Lolos screen2 ukuran ( 9.5 - 19,0) 0.298 M3 299,300.00 89,145.03
Lolos screen2 ukuran ( 0 - 5) 0.352 M3 353,400.00 124,509.35
Semen 9.870 Kg 2,000.00 19,740.00
Aspal 62.830 Kg 11,970.00 752,075.10
Jumlah : 985,469.48
Sewa Alat :
Wheel Loader 0.010 Jam 511,986.21 4,900.41
AMP 0.040 Jam 2,706,944.20 108,712.62
Genset 0.040 Jam 76,006.93 3,052.49
Dump Truck 1.236 Jam 231,676.66 286,351.14
Asp. Finisher 0.011 Jam 305,434.93 3,357.00
Tandem Roller 0.011 Jam 209,863.46 2,270.54
P. Tyre Roller 0.005 Jam 375,047.22 1,740.95
Alat Bantu 1.000 Ls 126,584.97 126,584.97
Jumlah : 536,970.12

Upah :
Pekerja 0.402 Jam 10,400.00 4,176.71
Mandor 0.040 Jam 17,600.00 706.83
Jumlah : 4,883.54
Jumlah Harga : 1,527,323.14
Nilai HSPK : 1,527,323.14
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Laston Lapis Antara (AC-BC) tebal 6 cm Ton


Bahan/Material :
Lolos screen2 ukuran ( 9.5 - 19,0) 0.348 M3 299,300.00 104,197.79
Lolos screen2 ukuran ( 0 - 5) 0.313 M3 353,400.00 110,493.77
Semen 9.450 Kg 2,000.00 18,900.00
Aspal 57.680 Kg 11,970.00 690,429.60
Jumlah : 924,021.16
Sewa Alat :
Wheel Loader 0.010 Jam 511,986.21 4,900.41
AMP 0.040 Jam 2,706,944.20 108,712.62
Genset 0.040 Jam 76,006.93 3,052.49
Dump Truck 1.236 Jam 231,676.66 286,351.14
Asp. Finisher 0.009 Jam 305,434.93 2,797.50
Tandem Roller 0.009 Jam 209,863.46 1,892.12
P. Tyre Roller 0.004 Jam 375,047.22 1,450.79
Alat Bantu 1.000 Ls 126,584.97 126,584.97
Jumlah : 535,742.04

Upah :
Pekerja 0.402 Jam 10,400.00 4,176.71
Mandor 0.040 Jam 17,600.00 706.83
Jumlah : 4,883.54
Jumlah Harga : 1,464,646.74
Nilai HSPK : 1,464,646.74

Beton mutu sedang fc’=30 MPa lantai


jembatan 1 m3
Bahan/Material :
Semen 469.680 Kg 2,000.00 939,360.00
Pasir beton 0.515 M3 168,600.00 86,744.70
Agregat Kasar 0.744 M3 203,100.00 151,106.40
Kayu Perancah 0.400 M3 4,725,000.00 1,890,000.00
Paku 3.200 Kg 23,900.00 76,480.00
Jumlah : 3,143,691.10
Sewa Alat :
Conc. Mixer 0.683 Jam 63,422.73 43,300.66
Water Tanker 0.038 Jam 186,855.34 7,129.02
Alat Bantu 1.000 Ls - -
Jumlah : 50,429.68
Upah :
Pekerja 1.365 Jam 10,400.00 14,200.80
Tukang 2.731 Jam 15,400.00 42,056.22
Mandor 0.683 Jam 17,600.00 12,016.06
Jumlah : 68,273.08
Jumlah Harga : 3,262,393.86
Nilai HSPK : 3,262,393.86
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Beton mutu sedang fc’= 25 Mpa 1 m3


Bahan/Material :
Semen 469.680 Kg 2,000.00 939,360.00
Pasir beton 0.510 M3 168,600.00 85,927.64
Agregat Kasar 0.744 M3 11,000.00 8,184.00
Kayu Perancah 0.200 M3 4,725,000.00 945,000.00
Paku 1.600 Kg 23,900.00 38,240.00
Jumlah : 2,016,711.64
Sewa Alat :
Conc. Mixer 0.683 Jam 63,422.73 43,300.66
Water Tanker 0.038 Jam 186,855.34 7,129.02
Alat Bantu 1.000 Ls - -
Jumlah : 50,429.68
Upah :
Pekerja 1.365 Jam 10,400.00 14,200.80
Tukang 2.048 Jam 15,400.00 31,542.17
Mandor 0.683 Jam 17,600.00 12,016.06
Jumlah : 57,759.03
Jumlah Harga : 2,124,900.35
Nilai HSPK : 2,124,900.35

Beton mutu sedang fc’= 20 MPa 1 m3


Bahan/Material :
Semen 422.300 Kg 2,000.00 844,600.00
Pasir beton 0.541 M3 168,600.00 91,238.54
Agregat Kasar 0.744 M3 32,600.00 24,254.40
Kayu Perancah 0.200 M3 4,725,000.00 945,000.00
Paku 1.600 Kg 23,900.00 38,240.00
Jumlah : 1,943,332.94
Sewa Alat :
Conc. Mixer 0.683 Jam 63,422.73 43,300.66
Water Tanker 0.038 Jam 186,855.34 7,129.02
Alat Bantu 1.000 Ls - -
Jumlah : 50,429.68
Upah :
Pekerja 1.365 Jam 10,400.00 14,200.80
Tukang 2.048 Jam 15,400.00 31,542.17
Mandor 0.683 Jam 17,600.00 12,016.06
Jumlah : 57,759.03
Jumlah Harga : 2,051,521.65
Nilai HSPK : 2,051,521.65
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Beton mutu rendah fc’= 15 MPa 1 m3


Bahan/Material :
Semen 327.540 Kg 2,000.00 655,080.00
Pasir beton 0.502 M3 168,600.00 84,702.05
Agregat Kasar 0.905 M3 16,200.00 14,665.05
Kayu Perancah 0.100 M3 4,725,000.00 472,500.00
Paku 0.800 Kg 23,900.00 19,120.00
Jumlah : 1,246,067.10
Sewa Alat :
Conc. Mixer 0.683 Jam 63,422.73 43,300.66
Water Tanker 0.038 Jam 186,855.34 7,129.02
Alat Bantu 1.000 Ls - -
Jumlah : 50,429.68
Upah :
Pekerja 1.365 Jam 10,400.00 14,200.80
Tukang 1.365 Jam 15,400.00 21,028.11
Mandor 0.683 Jam 17,600.00 12,016.06
Jumlah : 47,244.97
Jumlah Harga : 1,343,741.75
Nilai HSPK : 1,343,741.75

Baja Tulangan U 24 Polos kg


Bahan/Material :
Baja Tulangan (Polos) U24 1.100 Kg 25,300.00 27,830.00
Kawat Beton 0.003 Kg 25,000.00 62.50
Jumlah : 27,892.50
Upah :
Pekerja 0.105 Jam 10,400.00 1,092.00
Tukang 0.035 Jam 15,400.00 539.00
Mandor 0.035 Jam 17,600.00 616.00
Jumlah : 2,247.00
Jumlah Harga : 30,139.50
Overhead & Profit
15% : 4,520.93
Nilai HSPK : 34,660.43
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Pasangan Batu 1 m3
Bahan/Material :
Batu Kali 1.170 M3 241,100.00 282,087.00
Semen (PC) 176.000 Kg 2,000.00 352,000.00
Pasir 0.509 M3 203,100.00 103,346.65
Jumlah : 737,433.65
Sewa Alat :
Conc. Mixer 0.683 Jam 63,422.73 43,300.66
Water Tanker 0.001 Jam 186,855.34 262.65
Alat Bantu 1.000 Ls - -
Jumlah : 43,563.31
Upah :

Pekerja Biasa 5.462 Jam 10,400.00 56,803.21


Tukang 1.365 Jam 15,400.00 21,028.11
Mandor 0.683 Jam 17,600.00 12,016.06
Jumlah : 89,847.38
Jumlah Harga : 870,844.34
Nilai HSPK : 870,844.34

Agregat Utk. Lapis Pond. Jalan - Tanpa


Penutup Aspal Utk. Pek. Minor 1 m3
Bahan/Material :
Agregat Kelas C (M28) 1.200 M3 322,115.52 386,538.62
Jumlah : 386,538.62
Sewa Alat :
Wheel Loader 0.008 Jam 511,986.21 4,349.44
Dump Truck 5 ton 0.967 Jam 279,743.30 270,458.84
Pedestrian Roller 0.053 Jam 75,881.78 3,996.67
Water Tanker 0.014 Jam 186,855.34 2,626.48
Alat Bantu 1.000 Ls - -
Jumlah : 281,431.43
Upah :
Pekerja Biasa 0.127 Jam 10,400.00 1,325.25
Mandor 0.008 Jam 17,600.00 149.52
Jumlah : 1,474.77
Jumlah Harga : 669,444.82
Nilai HSPK : 669,444.82
HARGA SATUAN HARGA
KODE URAIAN KEGIATAN KOEF. SATUAN KETERANGAN
(Rp.) (Rp.)

Camp. Aspal Panas Utk.Pek.Minor 1 m3


Bahan/Material :
Agregat Kasar 0.773 M3 203,100.00 157,007.58
Agregat Halus 0.527 M3 199,600.00 105,205.83
Filler 25.300 Kg 2,050.60 51,880.18
Aspal 156.975 Kg 12,900.00 2,024,977.50
Jumlah : 2,339,071.09
Sewa Alat :
Wheel Loader 0.030 Jam 511,986.21 15,433.37
AMP 0.111 Jam 2,706,944.20 300,046.83
Genset 0.111 Jam 76,006.93 8,424.86
Dump Truck 5 ton 2.429 Jam 279,743.30 679,524.60
Pedestrian Roller 0.198 Jam 75,881.78 14,987.51
Alat Bantu 1.000 Ls - -
Jumlah : 1,018,417.17
Upah :
Pekerja Biasa 2.217 Jam 10,400.00 23,055.42
Mandor 0.222 Jam 17,600.00 3,901.69
Jumlah : 26,957.11
Jumlah Harga : 3,384,445.37
Nilai HSPK : 3,384,445.37

Camp. Aspal Panas Utk.Pek.Minor 1 m3


Bahan/Material :
Agregat Kasar 1.931 M3 203,100.00 392,208.67
Agregat Halus 0.000 M3 199,600.00 -
Aspal 109.200 Kg 12,900.00 1,408,680.00
Jumlah : 1,800,888.67
Sewa Alat :
Wheel Loader 0.009 Jam 511,986.21 4,354.24
Dump Truck 5 ton 1.668 Jam 279,743.30 466,720.97
3-Wheel Roller 0.013 Jam 214,968.98 2,784.93
Asp. Sprayer 0.039 Ls 66,020.07 2,606.06
Jumlah : 476,466.20
Upah :
Pekerja Biasa 0.170 Jam 10,400.00 1,768.96
Mandor 0.017 Jam 17,600.00 299.36
Jumlah : 2,068.32
Jumlah Harga : 2,279,423.19
Nilai HSPK : 2,279,423.19