Vous êtes sur la page 1sur 3

48 F 1F 1F B 8B 0 F BE AC

48 EF6 61F 21F 6B4 48B 008 80F3 3BE AC 060


E 1 21 6B 8 00 0 B A 0 E
EF F61F F21 F6B 48B B00 80F F3B EAC C06 60EC C69
F 8 E 0 4
F6 61F2 21F6 6B4 48B0 008 0F3 3BE AC 060 EC6 694 8EF
1F 1F B 8B 08 0F BE AC 060 EC 94 8E 61
61 21 6B 48 00 0 3B A 06 E 69 8 F6 F2
F F 4 B 8 F3 E C 0 C 4 EF 1 1
F2 21F6 6B4 8B0 0080 0F3 BEAAC0 060E EC6 6948 8EF 61F F21F F6B
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48
21 6B 8 00 0F B A 06 E 69 8E 6 F2 F6 4 B0
F B E C C 1 8
1F 6B4 48B 008 80F3 3BE AC 060 0EC 694 48EF F61 F21 1F6B B48 B00 080
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3

Q.2
Q.1
N.B:

55931
6B 48B 00 80F 3B EAC 06 0EC 69 48E F61 F2 1F6 B4 8B0 080 F3 BEA
8 E 4 1 8 B
B4 48B 008 0F3 3BE AC 060 0EC 694 8EF F61F F21 F6B B48 B00 080F F3B EA C06
8B 008 0F BE AC 060 EC 694 8E 61 21 F6 48 B0 80 3B EA C0 0E
48 00 0F 3B A 06 E 69 8E F6 F2 F B4 B 08 F3 E C 60 C
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69

i)
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E

ii)
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008
Wednesday, May 29, 2019

𝑐+𝑑
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F

Product B
a)For the game [

Product C
Product A
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C

−𝑐 𝑑
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69

𝑎 −𝑏
𝑎+𝑏
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E

And 𝑥1 𝑎𝑛𝑑 𝑥2 ≥ 0
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F

needed to complete the work


3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
(CBSGS) / 42813 - 9)Operations Research

(1) Question no 1 is compulsory

C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6

3𝑥1 − 2𝑥2 ≥ 6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4
(5) Notations carry usual meaning

8𝑥1 + 2𝑥2 ≥ 16

0
4
5
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B
Answer any four of the following:

Subject to 5𝑥1 + 10𝑥2 ≤ 50


69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008

Maximize Z =100𝑥1 + 80𝑥2

Lathe

to yield maximum profit?


(4) Assume Suitable data if necessary

48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F
Time: 3 Hours

EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3

b)Solve the LPP by Graphical method:


61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE 𝑏+𝑑
10:30 am - 01:30 pm

F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC
(3) Figures to the right indicate full marks
55931

1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06

c)Explain Bellman’s Principle of optimality


6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C

Page 1 of 3
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
𝑎+𝑐

0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
(2) Attempt any three out of remaining five questions

60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4

products on different machines is given in Table below:

clearly the assumptions if any, made by you.


EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B

5
3
9

C6948EF61F21F6B48B0080F3BEAC060E
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008

e)Define a queue. State the characteristics of waiting line.


48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F

Milling
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C
𝑎𝑑−𝑏𝑐
Paper / Subject Code: 42813 / 9)Operations Research

B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69
A[𝑎+𝑏+𝑐+𝑑 , 𝑎+𝑏+𝑐+𝑑]; B [𝑎+𝑏+𝑐+𝑑 , 𝑎+𝑏+𝑐+𝑑] and v= 𝑎+𝑏+𝑐+𝑑.

08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E


0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
Marks: 80

3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B

2
0
3
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 0
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0
1T01417 - B.E.(MECHANICAL)(Sem VII)

61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 0

Grinder

(10 marks)
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 8
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F
d) How do you test initial feasible solution for optimality by Stepping Stone method.(05)
(05)
] where a,b,c,d are all ≥ 0 prove that the optimal strategies are:

(05)

(05)
(05)

take more or less than 30 minutes depending on type of dental work to be done. The
b) A dentist schedules all her patients for 30 minutes appointments. Some of the patients

following summary shows the various categories of work, their probabilities and time
RS.30,product B Rs.12 and product C Rs.15.The time taken by each unit of the three

How much quantity of products A, B and C must be manufactured every week


offered products A, B and C to be manufactured. Each unit of product A yields
a) A jobbing shop has three machine groups, namely lathes, milling machines and grinders.
It has an idle capacity of 350 hours, 500 hours and 150 hours per week respectively. It is

What capacity of each machine remains idle after making these products? State
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A
EC 94 8E 61 21 F6 48 0 80 3B EA
69 8E F61 F2 F6 B4 B0 080 F3B EA C
48 F6 F 1F B4 8B 08 F3 E C
E 2 6 0 0 A 0
48 F 1F 1F B 8B 0 F BE AC
48 EF6 61F 21F 6B4 48B 008 80F3 3BE AC 060
E 1 21 6B 8 00 0 B A 0 E
EF F61F F21 F6B 48B B00 80F F3B EAC C06 60EC C69
F 8 E 0 4
F6 61F2 21F6 6B4 48B0 008 0F3 3BE AC 060 EC6 694 8EF
1F 1F B 8B 08 0F BE AC 060 EC 94 8E 61
61 21 6B 48 00 0 3B A 06 E 69 8 F6 F2
F F 4 B 8 F3 E C 0 C 4 EF 1 1
F2 21F6 6B4 8B0 0080 0F3 BEAAC0 060E EC6 6948 8EF 61F F21F F6B
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48
21 6B 8 00 0F B A 06 E 69 8E 6 F2 F6 4 B0
F B E C C 1 8
1F 6B4 48B 008 80F3 3BE AC 060 0EC 694 48EF F61 F21 1F6B B48 B00 080
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3

Q.4
Q.3

55931
6B 48B 00 80F 3B EAC 06 0EC 69 48E F61 F2 1F6 B4 8B0 080 F3 BEA
8 E 4 1 8 B
B4 48B 008 0F3 3BE AC 060 0EC 694 8EF F61F F21 F6B B48 B00 080F F3B EA C06
8B 008 0F BE AC 060 EC 694 8E 61 21 F6 48 B0 80 3B EA C0 0E
48 00 0F 3B A 06 E 69 8E F6 F2 F B4 B 08 F3 E C 60 C
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
Filling
Crown

E
B

D
C
A
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
Cleaning

maximum.
Category

C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6 Check-up

Batting
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4

Position
Extraction

Batsman

Warehouse
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B

barber’s chair.
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3

Demand
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06

B
C
A
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C

58
20
50
42
40

warrant a second barber?


III
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69

warehouse to each market.


08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
15
45
15
60
45

60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4

7
5
5
6
P
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3

60
19
48
30
40
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE IV
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C

Page 2 of 3
7
9
3
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69

12
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
V

59
20
40
16
35

60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4

Market
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B

C6948EF61F21F6B48B0080F3BEAC060E
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F

8
2
5
R

17
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC

iii) How much time can a customer expect to wait for his turn?
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06

iv) How much time can a customer expect to spend in the shop?
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E

ii) What is the expected number of customers in the barber shop?


0.20
0.10
0.15
0.15
0.40

48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C
Paper / Subject Code: 42813 / 9)Operations Research

B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
55
18
60
25
25
VI

0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
numbers for handling the above problem.40,82,11,34,25,66,17 and 79.

9
6
7
4
S
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 0
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 0
i) What is the probability that a new arrival need not wait for the barber to be free?
53
25
50
27
50

F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00

8
VII

15
22
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 8
Time required (minutes) Probability of category

6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80

(10 marks)

Supply
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F
(10 marks)

(10 marks)
Make the assignment so that the expected total average runs scored by these batsmen are
a) A captain of a cricket team has to allot five middle order batting positions to five
patients as well as the idleness of the doctor. Assume that all the patients show up at the

in the shop exceeds 1.25 hours. How much must the average rate of arrivals increase to

a) The following table has all necessary information on availability of supply to each
warehouse, the requirement of each market and unit transportation cost (in Rs.) from each
Simulate the dentist’s clinic for four hours and determine the average waiting time for the

v) Management will put in another and hire another barber when customer’s average time
inter arrival time of 20 minutes. Customers spend on an average of 15 minutes in the
b) Customers arrive at one person barber shop according to Poisson process with mean
batsmen. The average runs scored by each batsman at these positions are given in the table.
clinic exactly as per scheduled arrival times, starting 8 A.M.Use following random

08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A
EC 94 8E 61 21 F6 48 0 80 3B EA
69 8E F61 F2 F6 B4 B0 080 F3B EA C
48 F6 F 1F B4 8B 08 F3 E C
E 2 6 0 0 A 0
48 F 1F 1F B 8B 0 F BE AC
48 EF6 61F 21F 6B4 48B 008 80F3 3BE AC 060
E 1 21 6B 8 00 0 B A 0 E
EF F61F F21 F6B 48B B00 80F F3B EAC C06 60EC C69
F 8 E 0 4
F6 61F2 21F6 6B4 48B0 008 0F3 3BE AC 060 EC6 694 8EF
1F 1F B 8B 08 0F BE AC 060 EC 94 8E 61
61 21 6B 48 00 0 3B A 06 E 69 8 F6 F2
F F 4 B 8 F3 E C 0 C 4 EF 1 1
F2 21F6 6B4 8B0 0080 0F3 BEAAC0 060E EC6 6948 8EF 61F F21F F6B
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48
21 6B 8 00 0F B A 06 E 69 8E 6 F2 F6 4 B0
F B E C C 1 8
1F 6B4 48B 008 80F3 3BE AC 060 0EC 694 48EF F61 F21 1F6B B48 B00 080
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3

Q.6
Q.5

55931
6B 48B 00 80F 3B EAC 06 0EC 69 48E F61 F2 1F6 B4 8B0 080 F3 BEA
8 E 4 1 8 B
B4 48B 008 0F3 3BE AC 060 0EC 694 8EF F61F F21 F6B B48 B00 080F F3B EA C06
8B 008 0F BE AC 060 EC 694 8E 61 21 F6 48 B0 80 3B EA C0 0E
48 00 0F 3B A 06 E 69 8E F6 F2 F B4 B 08 F3 E C 60 C
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69 i)
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F ii)
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21

iv.
v.
ii.
i.
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4

Job
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008

Where 𝑥, 𝑦 ≥ 0
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F

𝑦 ≥ 60

Machine B
Machine C
Machine A
𝑥 ≤ 80
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE

Minimize Z=3x+8y
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC

with it.
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E

Subject to 𝑥 + 𝑦 = 200
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C

6
7
1
a) Using Big-M method,

12
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F

b) Given the following data:


3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
from C to P,1 unit from C to R.

C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4
EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B

5
6
2
10
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008

Assume scrap value to be negligible.


48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC

of one unit is Rs.300 per year. Determine:

Order of processing: A-C-B


1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E

Is the given sequence optimal?


48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C

iii) Maximum inventory level in the cycle and

Page 3 of 3
B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69

6
6
9
3
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6

ii) The manufacturing time and the time between setup


60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4

Suggested sequence of Jobs: 5-3-6-2-1-4


EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8B

C6948EF61F21F6B48B0080F3BEAC060E
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B 008

4
5
4
48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 00 0F

14
respect to Player A and find optimal solution for this game.

EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0 80 3

i) The optimum manufacturing quantity and no. of shortages


61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 08 F3 BE
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00 0F BE AC
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 80 3B A 06
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80 F3 EA C0 0E
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F3 BE C 60 C
Paper / Subject Code: 42813 / 9)Operations Research

B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F BE AC 06 EC 69
08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3B A 06 0E 69 48E

2
4
7
5
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B EA C0 0E C6 48 F

iii. Determine the total elapsed time for sequence suggested.


3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3 E C 60 C 94 EF 61F

iv) Total associated cost per year if the cost of an item is Rs.25 per unit.
Find optimal schedule and minimum total transportation cost.

EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE AC 060 EC 694 8E 61 21


Check and see if the clerk has worked out the optimal schedule

C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE AC 06 EC 694 8E F61 F21 F6
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A 06 0EC 69 8E F6 F2 F6 B4
(10 marks)

EC 94 8E 61 21 F6 48 0 80 3B EA C0 0E 6 48 F6 1F 1F B 8

(10 marks)
69 8E F61 F2 F6 B4 B0 080 F3B EA C0 60E C6 948 EF 1F 21F 6B 48B
The shipping clerk has worked out the following schedule from his experience:

48 F6 F 1F B4 8B 08 F3 E C 60 C 94 EF 61 21 6B 48 0

4
4
9
6
EF 1F 21 6B 8B 00 0F B AC 06 EC 69 8E 6 F2 F6 4 B0
61 21 F6B 48 00 80 3B EA 06 0E 69 48 F6 1F2 1F B4 8B 0
F2 F6 4 B0 80 F3 EA C0 0E C6 48 EF 1F 1F 6B 8B 00
1F B4 8B 08 F3 BE C 60 C 94 EF 61 21 6B 48 00 8
6B 8B 00 0F B AC 06 EC 69 8E 61 F2 F6 4 B0 80
48 00 80F 3B EA 06 0E 69 48E F6 F2 1F B4 8B 08 F
(10 marks)

B0 80 3 EA C0 0E C6 48 F 1F 1F 6B 8B 00 0F
(10 marks)
(10 marks)

(10 marks)
both the players is an odd number, then Player A has to give money in rupees equivalent
to the number of fingers shown by him to Player B.Construct the playoff matrix with

per year thereafter. If money is worth 10% per year, which machine should be purchased?
costs are estimated as Rs.1600 for each of the first five years, increasing by Rs.400 per
players is an even number, then player B has to give money in rupees equivalent to the
12 units from A to Q,1 unit from A to R,8 units from A to S,15 units from B to R,7 units

selected fingers of his right hand. If the sum of the number of fingers shown by both the

b) The demand for an item is deterministic and constant over time and it is equal to 24000
a) A manufacturer is offered two machines A and B.A is priced at Rs.10,000 and running

Rs 5000 but will have running costs of Rs.2400 per year for six years, increasing by Rs.400

units per year and company can produce the item at a rate of 4000 per month. The cost of
one setup is Rs.600 and the carrying cost is 20 paisa per unit per month. The shortage cost

If No, then determine the optimal sequence and total elapsed time associated
b) There are two players in a game, Player A and Player B.Each of them randomly shows

year in the sixth and subsequent years. Machine B which has the same capacity as A, costs
number of fingers shown by him to Player A; if the sum of number of fingers shown by

08 F3 BE C 60 C 94 EF 61F 21 6B 48 00 80F 3
0F BE AC 06 EC 69 8E 61 2 F6 48 B0 80 3B
3B A 06 0E 69 48 F6 F2 1F B4 B 08 F3
EA C0 0E C6 48 EF 1F 1F 6B 8B 008 0F BE
C0 60E C6 948 EF 61F 21F 6B 48B 008 0F 3BE
60 C6 94 EF 61F 21 6B 48B 00 0F 3B A
EC 94 8E 61 21 F6 48 0 80 3B EA
69 8E F61 F2 F6 B4 B0 080 F3B EA C
48 F6 F 1F B4 8B 08 F3 E C
E 2 6 0 0 A 0

Vous aimerez peut-être aussi