B
ELV +4.80
m
m
66
35
A=
K-
.1
K-1
.2
m
K-1
m
.3
10
K-1
F2
K-16A.1
.4
41
K-1
ELV +4.95
1=
K-16A.2
K-
.1
633
K-2
F2
.2
K-16A.3
m
K-2
8m
.3
K-2
39
K-16A.4
.4
C
K-2
ELV +5.05
K-3 -2=
F2
K-16A.5
.1
K
m
.2
F1
.6
m
K-16A
K-3
30
.3
K-3
46
A.7
.4
K-16
K-3
3=
8
K-
.1
F2
16A.
m
K-4
K-
.2
m
ELV +4.90
A.9
K-4
F1
80
.3
K-16
K-4
46
.4
.10
K-4
4=
6A
K-1+4.95
ELV
K-
m
.1
A F2
K-5
16
1m
.2
K- .1
K-5
F1
.3
78
6B
K-5
K-1
.4
=4
.2
K-5
m
6B
11m
K-5
K-1
.1
.3 F2
6B
K-6
ELV +5.05
.2
K-1
75mm
= 46
ELV +4.80 .4
K-6
.3
6B
K-6
.4
K-1
F1
F1
K-6
K-8= 4239mm
K-6
6B
.1
6.1
K-7= 42
K-7
K-7.2
1
K-1
K-9= 4367mm
3
K-
6.2
K-7.
4
F1
K-7.
ELV +5.10
K-1
6.3
mm
D
1
K-8.2
K-1
K-8.
6.4
ELV +5.05
K-8.3
K-8.4
K-10= 4728
F1
K-1
F1
K-9.1
mm
.1
K-9.2
m
K-9.3
K-17
K-10.1
K-9.4
m
.2
K-10.2
5530
K-10.3
.3
K-17
K-10.4
14
ELV +4.95
K-17
F1
K-11.1
92m 17.4
ELV +5.05
23
K-11.2
F1
mm
K-11.3
K-11.4
m
K-
K-11=
.1
6=
ELV +4.90
.2
K-18
31
.3
.1
K-1
K-18
.4
F1
K-18
K-12
.2
61
K-18
F1
.1
.3
K-12
7= 31
.2
mm
.4
K-19
K-12
F1
2=
.3
K-19
K-12
.4
F2
m
K-19
K-19
K-1
3.1
m
.1
4032
ELV +5.05
F2
.2
3.2
18
K-20
K-1
K-1
mm
.3
K-20
F2
.4
3.3
K-20
K-1
60
K-20
.1
3.4
K-1
ELV +5.20
4648
F1
K-21
K-1 3=
mm
.2
K-1
K-18
.3
K-21
F2
K-1
8m K-21.4
4.1
K-21
5123
m
K-19=
4.2
K-2 2.1
m
K-1
87
ELV +4.90
4.3
K-2 .2
K-2
5
54
.0 E
2
0=
K-1
-0
K-2 2.3
L AC
4.4
ELV +4.80 FF RR
33
=
2.4
F2
K-2
K-1
14
TE
ELV +5.05
F1
=5
3.1 K- 5.1
m
1
K-1
m
K-2
K-2
3.2
37
5.2
K-2 K-1
52
3.3
0 EA ELV +5.05
5.3
mm
.0
±0 AR
K-2 3.4
E
=
K-1
L Y
80
22
F2
FF RIT
K-2 5.4
36
CU
K-
SE
m K-1
4.1 5=
ELV +4.95
5m K-2 .2 K-1
65 .1
F1
4 2
.0 4
K-2 3 K-1
5A
3=
-0
L ET
IL
4. .2
K-2
FF
5A
K-2 K-1
2TO
.0
4.4 A.3
-0
L EA
K-2 K-15
FF AR
F2
m A.4
2m K-15
63 K-25
.1
4 =3 .2 K-15
A
K-2 K-25 ELV +4.90
.3
F1
ELV +5.20
K-25
.4
K-25
F2
mm
K-2 5= 2030 K-26.1
ELV +5.05
K-26.2
ELV +4.80
K-26.3
K-26.4 4.80 ELV +4.90
F2
ELV +5.05
4.7
K-26
4.8
5.0
K-26.5
4.9
K-26.6 ELV +5.20
K-26.7
0
ELV +5.10
0
K-26.8
0
K-26.9
ELV +4.95
0
F2
ELV +4.90
ELV +4.85
A
ELV +5.05
ELV +4.70
4.70
ELV +4.85
K-27=
117m
m
K-28
.1
F3
K-28
.2
K-28
.3
K-28 K-28
.4
=
B
727m
m
F3
K-29.4
K-29.4
K-29.4 ELV +4.75
K-29.4
K-29= 1548
mm F2
K-30.1
K-30.2
K-30.3
K-30.4
ELV +4.60
4.60
F2
K-30= 2339mm
K-31.1
K-31.2
K-31.4
F2
mm
K-31= 2833
K-32.1
K-32.2
K-32.3
F2
K-32.4
m
40m
2= 27 K-33.1
K-3
.2
K-33
F2
3.3
K-3
3.4
K-3
m
5m
04 4.1
3=2 K-3
4.2
F2
K-3
D
K-3
4.3 F3
K-3
4.4
K-3
m
5.1 F3
m
K-3
99
5.2
10
K-3
5.3
=
K-3
5.4
34
K-3
K-
6
.1
m
K-3
6
6.2
4m
K-3
6.3
K-3
6.4
30
K-3
K-3
5=
K-3
E
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:60 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
ELV +4.95 ELV +4.95 ELV +4.95 ELV +4.95
ELV +4.80 ELV +4.80
DATUM ELEV
3.00
GROUP Quick Section JALAN MEDIAN JALAN
ASPAL JALAN ASPAL
SECTION A-A
ELV +5.05 ELV +5.05 ELV +5.10 ELV +5.05 ELV +4.95
ELV +4.90 ELV +4.95
ELV +4.80
0.50
DATUM ELEV
1.80
0.40
0.10
1.60 0.60 0.80
0.05
3.00
3.00
3.20
ELV +5.40
ELV +5.20
ELV +5.05 ELV +5.05 ELV +5.10 ELV +4.95 ELV +4.95
ELV +4.90 ELV +4.90 ELV +4.80
0.50
0.50
DATUM ELEV
1.80
1.80
0.40
0.40
0.10
0.10
3.00
1.60 0.60 0.80
0.05
3.20
3.00
3.00
3.20
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:40 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
ELV +5.05 ELV +5.05
ELV +4.90 ELV +4.85 ELV +4.85
ELV +4.70
0.50
DATUM ELEV
1.40
1.80
0.40
0.10
1.10 0.60 0.80
0.05
3.00
2.50
2.70
ELV +5.20
ELV +5.05 ELV +5.05
ELV +4.90 ELV +4.90
ELV +4.75 ELV +4.75
ELV +4.60
DATUM ELEV
2.00 JALAN ISLAND JALAN MEDIAN JALAN
SECTION E-E
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:40 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9
WF beam 250x125x6x9
Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9
WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9
WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9
WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9
WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9 4380
WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm 4432 Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 4403 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 4436
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm
Gusset plat t = 10 mm 4339 4382 4408 WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm 470
WF beam 250x125x6x9
0
4413 4395 Girder WF 300x300x10x15
4415 Girder WF 300x300x10x15 Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 4427 4410 4411
Girder WF 300x300x10x15 WF beam 250x125x6x9
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Gusset plat t = 10 mm 4479
Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 Girder WF 300x300x10x15
6475
Girder WF 300x300x10x15 Gusset plat t = 10 mm WF 400x200x8x13
6287
Girder WF 300x300x10x15 Girder WF 300x300x10x15 Girder WF 300x300x10x15 Girder WF 300x300x10x15 WF 400x200x8x13 Gusset plat t = 10 mm
Girder WF 300x300x10x15 Girder WF 300x300x10x15
5767
5737
Girder WF 300x300x10x15 Girder WF 300x300x10x15 WF 400x200x8x13
Girder WF 300x300x10x15
WF 400x200x8x13
5056
5047
5017
4946
4837
4797
4726
4636
4636
4477
4047
WF 400x200x8x13 Girder WF 300x300x10x15
WF 400x200x8x13 WF 400x200x8x13 WF 400x200x8x13 WF 400x200x8x13 WF 400x200x8x13
WF 400x200x8x13 WF 400x200x8x13 WF 400x200x8x13
3165
WF 400x200x8x13 WF 400x200x8x13
WF 400x200x8x13 WF 400x200x8x13
DATUM ELEV
3.00
GROUP Quick Section
SECTION LONG SEC. COL. 1
F2 F1 F1 F1 F1 F1 F1 F1 F1 F2 F2 F2 F2 F2 F2 F2 F2
K-A K-1 K-2 K-3 K-4 K-5 K-6 K-7 K-8 K-9 K-10 K-11 K-12 K-13 K-14 K-15 K-15.A
BoF +3.200
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:27 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9
WF beam 250x125x6x9
WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm
Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9 4185 4208 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
4175
Gusset plat t = 10 mm WF beam 250x125x6x9 4250
WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm 4179
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9
WF beam 250x125x6x9
4305
Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm Girder WF 300x300x10x15
Girder WF 300x300x10x15 Gusset plat t = 10 mm WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9
4190 Girder WF 300x300x10x15 Gusset plat t = 10 mm
Gusset plat t = 10 mm Gusset plat t = 10 mm Girder WF 300x300x10x15 Girder WF 300x300x10x15
WF beam 250x125x6x9 Girder WF 300x300x10x15 WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Girder WF 300x300x10x15
Gusset plat t = 10 mm Gusset plat t = 10 mm Girder WF 300x300x10x15 Gusset plat t = 10 mm
Gusset plat t = 10 mm WF 400x200x8x13 WF beam 250x125x6x9
WF beam 250x125x6x9 WF 400x200x8x13 WF beam 250x125x6x9
WF beam 250x125x6x9 WF 400x200x8x13 Gusset
440 plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm Girder WF 300x300x10x15 WF 400x200x8x13 Girder WF 300x300x10x15 3 Gusset plat t = 10 mm
Gusset plat t = 10 mm 4206
Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
5418
WF beam 250x125x6x9 Girder WF 300x300x10x15 Girder WF 300x300x10x15 Gusset plat t = 10 mm
5255
WF beam 250x125x6x9
5118
Gusset plat t = 10 mm WF 400x200x8x13 WF 400x200x8x13
Gusset plat t = 10 mm
4661
WF beam 250x125x6x9
4654
WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm Girder WF 300x300x10x15
4006
WF beam 250x125x6x9
4161 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 Girder WF 300x300x10x15 WF beam 250x125x6x9
3648
WF beam 250x125x6x9
WF beam 250x125x6x9 WF 400x200x8x13
3169
Gusset plat t = 10 mm Girder WF 300x300x10x15 4374
WF beam 250x125x6x9
WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm WF 400x200x8x13 Girder WF 300x300x10x15
4105 WF beam 250x125x6x9
WF beam 250x125x6x9 WF beam 250x125x6x9 Girder WF 300x300x10x15
2286
2244
WF beam 250x125x6x9 Gusset plat t = 10 mm
4022 WF 400x200x8x13 Girder WF 300x300x10x15
1511
948
WF 400x200x8x13
WF 400x200x8x13
Girder WF 300x300x10x15 Girder WF 300x300x10x15 Girder WF 300x300x10x15
WF 400x200x8x13 WF 400x200x8x13 WF 400x200x8x13
Girder WF 300x300x10x15 Girder WF 300x300x10x15 Girder WF 300x300x10x15
Girder WF 300x300x10x15
Girder WF 300x300x10x15 WF 400x200x8x13
DATUM ELEV
3.00
GROUP Quick Section
SECTION LONG SEC. COL. 2
F2 F2 F2 F2 F2 F1 F1 F1 F1 F1 F1 F1 F1 F1 F2 F2
K-16A.1 K-16A.6 K-16A K-16B K-16 K-17 K-18 K-19 K-20 K-21 K-22 K-23 K-24 K-25 K-26 K-26.9
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9
WF beam 250x125x6x9
Gusset plat t = 10 mm
WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9
Gusset plat t = 10 mm 3801 Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9 3832 WF beam 250x125x6x9
Gusset plat t = 10 mm WF
3879 beam 250x125x6x9
Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9 WF beam 250x125x6x9
3871
WF beam 250x125x6x9 Gusset plat t = 10 mm
WF beam 250x125x6x9
Gusset plat t = 10 mm WF beam 250x125x6x9
Girder WF 300x300x10x15 3933 WF beam 250x125x6x9
WF beam 250x125x6x9
3885 Gusset plat t = 10 mm Girder WF 300x300x10x15 WF beam 250x125x6x9
Gusset plat t = 10 mm
3437
3356
WF beam 250x125x6x9 WF beam 250x125x6x9
WF beam 250x125x6x9 Girder WF 300x300x10x15
Girder WF 300x300x10x15
2902
WF beam 250x125x6x9 WF beam 250x125x6x9
Girder WF 300x300x10x15
2641
3910
WF beam 250x125x6x9 Gusset plat t = 10 mm Girder WF 300x300x10x15
2108
3861 Gusset plat t = 10 mm
Gusset plat t = 10 mm
1690
Girder WF 300x300x10x15
WF beam 250x125x6x9 Girder WF 300x300x10x15 3817
1290
863
WF 400x200x8x13
673
WF 400x200x8x13 WF 400x200x8x13
586
WF 400x200x8x13 WF 400x200x8x13 WF 400x200x8x13
Gusset plat t = 10 mm Girder WF 300x300x10x15 Gusset plat t = 10 mm
WF 400x200x8x13
Girder WF 300x300x10x15 Girder WF 300x300x10x15 Gusset plat t = 10 mm
WF 400x200x8x13 Girder WF 300x300x10x15
Girder WF 300x300x10x15
Girder WF 300x300x10x15
DATUM ELEV
3.00
GROUP Quick Section
SECTION LONG SEC. COL. 3
F3 F2 F2 F2 F2 F2 F2 F2 F3 F3
K27 K28 K29 K30 K31 K32 K33 K34 K35 K36
BoF +3.200
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
m
m
66
35
A=
K-
1.1
K-
1.2
m
m
K-
1.3
10
K-
F2
K-16A.1
1.4
41
K-
1 =
K-16A.2
K-
2 .1
F2
K-
2.2
m
K-16A.3
K-
m
2.3
98
K-
K-16A.4
2.4
43
K-
=
F2
2
K-16A.5
K-
3.1
m
K-
K- 3.2
F1
6
m
K-16A.
K-
30
3.3
46
6A.7
3.4
K-1
.1 =
K-
K-4 -3
A.8
F2
K
6
m
K-1
.2
0m
K-4
6A.9
F1
.3
8
K-1
K-4
46
.4
.10
K-4
6A
K-5 -4=
K-1
mm
.1
K
A F2
16
.2
K- .1
81
K-5
F1
.3
6B
K-5
47
1
K-
.4
.2
K-5
mm
6B
5=
1
K- .3
.1
F2
K-
6B
611
K-6
1
.2
K-
mm
4
B.
K-6
.3
=4
16
K-6
.4
K-
F1
F1
75
K-6
K-8= 4239mm
B
K-6
.1
6.1
16
K-7= 42
K-7
.2
K-1
K-9= 4367mm
.3
K-
K-7
6.2
.4
F1
K-7
K-7
K-1
6.3
m
.1
K-8.2
8m
K-1
6.4
K-8
K-8.3
K-8.4
F1
K-1
F1
K-9.1
mm
K-10= 472
.1
K-9.2
mm
K-9.3
7
K-10.1
K-9.4
K-1
.2
K-10.2
5530
K-10.3
.3
7
K-10.4
4
K-1
7
31
F1
K-11.1
.4
K-1
K-11.2
F1
K-11.3
mm
=2
K-11.4
K-1
mm
K-11=
8.1
8.2
16
31
8.3
2.1
K-1
32m 8.4
F1
192
K-1
K-
2.2
61
K-1
K-1
F1
9.1
2.3
K-1
K-1
9.2
m
2.4
F1
2=
9.3
7= 3
K-1
K-1
48m 9.4
mm
F2
K-1
K-1
K-1
3.1
K-1
0.1
K-1
F2
.2
3.2
18
K-1
K-1
m
0.3
K-2
0
F2
= 40
0.4
3.3
K-2
K-1
60
K-2
1.1
3.4
K-2
K-1
F1
K-1 3=
1.2
K-1
K-2
K-18
1.3
= 46
3m
F2
1
K-2
mm .4
4.1
K-
K-2
38 K-21
m
.2
512
K-2 2.1
m
14
K-19
87
4.3
K-
2.2
K-2
54
0=
1
K- 2.3
K-
.4
=
14
m 2.4
F2
2
K-2
14
53
K-
K-
F1
2
.1 K- .1
=
23 2 15
21
K-
m
K- .
37
.2
23 3
K-
15
K- K-
52
.
23 .3
K- 23.4 15 mm
=
K-
80
22
F2
K- 5.4
36
K-
K-1
mm 24
.1
15
=
65
5 K- K- .1
F1
4 4.2 5A
3= K-2 K-1 .2
2 4.3 5A
K- K-2 K-1
4.4 5A
.3
K-2 K-1
F2
m 5A.4
3 2m 5 .1 K-1
= 36 K-2
5A
4 .2 K-1
K-2 K -25
5.3
F1
K-2
4
K-25.
F2
m
2030m
K-25= K-26.1
K-26.2
K-26.3
K-26.4
F2
K-26
K-26.5
K-26.6
K-26.7
K-26.8
K-26.9
F2
X=425509.364 X=425483.353 X=425516.003
K-A K-16A.1 K-27
Y=9016644.055 Y=9016645.027 Y=9016585.227
X=425512.909 X=425483.974 X=425514.825
K-1 K-16A.6 K-28
Y=9016641.343 Y=9016640.880 Y=9016581.603
X=425516.103 X=425485.621 X=425514.070
K-2 K-16A K-29
Y=9016638.288 Y=9016637.211 Y=9016577.861
X=425519.105 X=425488.232 X=425513.708
K-3 K-16B K-30
K-27
Y=9016635.196 Y=9016634.107 Y=9016574.062
= 11
7mm
X=425522.361 X=425491.543 X=425513.811
K-28.
1 K-4 K-16 K-31
Y=9016632.318 Y=9016631.710 Y=9016570.252
F3
K-28.
2
K-28.
3
K-28 K-28. X=425526.030 X=425495.255 X=425514.510
= 727
mm
4
K-5 K-17 K-32
Y=9016629.909 Y=9016629.941 Y=9016566.515
F3
K-29
.4
K-29.4
X=425530.042 X=425499.103 X=425515.959
K-29.4
K-6 K-18 K-33
K-29= 154
K-29.4 Y=9016628.092 Y=9016628.467 Y=9016563.012
8mm
F2
K-30= 2339mm
K-31.1 Y=9016626.024 Y=9016625.581 Y=9016557.462
K-31.2
3mm
K-31= 283
K-32.1 X=425547.316 X=425514.056
K-32.2
K-10 K-22
K-32.3
Y=9016624.781 Y=9016621.327
F2
K-32
.4
X=425551.656 X=425516.929
mm K-11 K-23
K-3
2= 2
740
K-33
.1 Y=9016624.229 Y=9016618.249
3 .2
K-3
X=425555.798 X=425519.069
F2
K-3
3.3
K-12 K-24
K-
33
.4 Y=9016622.775 Y=9016614.640
m
5m
=2
04
K-
34
.1
X=425559.459 X=425520.361
-33 .2 K-13 K-25
F2
K 34
K-
K-
34
.3
.4
F3 Y=9016620.371 Y=9016610.653
34
K-
X=425563.002 X=425520.664
m
1
5. F3
K-14 K-26
m
3
K- .2
99
35
Y=9016617.817 Y=9016606.470
10
K-
5.3
=
.4
34
K-
35
K-
K-
X=425565.035 X=425519.606
6.1
m
K-3
6.2
m
K-3
K-15 K-26.9
6.3
04
K-3
6.4
K-3
Y=9016613.946 Y=9016602.043
=3
K-3
35
K-
X=425568.025
K-15A
Y=9016610.515
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:40 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) PERSPECTIVE
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:40 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM PERSPECTIVE CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP)
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:40 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Pile Cap Ø40cm
Pedestal 400
8 - D 10 mm
3000
Steel pipe pile T=8mm
500 2000 500
Steel pipe pile T=8mm
400
D 10mm
700
1 Stirrup Ø8 - 10cm
A A
F1
Concrete 25mpa
1500
2500
1100
SECTION 1-1
700
D 10mm
400
0.15
0.15
0.50
Steel pipe pile T=8mm Stirrup Ø8 - 15cm
Concrete 25mpa
6000
3000
Main Reinforcement 12D16mm
Ø12-200 mm
1.80
0.40
0.10
400
Stirrup Ø8 - 10cm
1500
Concrete 25mpa
D 10mm
3 SECTION 3-3
400
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:7 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Welded Welded
4907 4907
3363 3363
Elv +9.402 Elv +9.402
1143 1143
Elv +9.116 Elv +9.112
600 600
1100 1100
598 598
320
320
496 496
Elv +8.403 Elv +8.403
85
.10
.10
85
Gusset plat t = 10 mm Gusset plat t = 10 mm
°
Girder WF 300x300x10x15 Gusset plat t = 10 mm Gusset plat t = 10 mm Girder WF 300x300x10x15
Bolt M16 mm Bolt M16 mm
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
4136
WF 400x200x8x13 WF 400x200x8x13
0.15
Welded to WF Steel Column
0.15
Elv +5.000 Elv +5.000
0.50
0.50
Elv +4.806 Elv +4.806
Main Reinforcement 12D16mm
1.40
1.40
Ø12-200 mm
1.80
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
0.40
Elv +3.200 Elv +3.200
0.10
0.10
1.10 0.60 0.80 0.80 0.60 1.10
0.05
0.05
Lean Concrete T=100mm 2.50 2.50
Sandbed T=50mm 2.70 2.70
KA KA
600
320
1206 600 1505 800
320
600
0 °
.0
90
Gusset plat t = 10 mm
9°
93
.2
.7
Gusset plat t = 10 mm 86
1 °
Girder WF 300x300x10x15
Girder WF 300x300x10x15
K-1.3
K-1.1
320
600
600
1300 1600 Gusset plat t = 10 mm
320
86
°
03
700 .9
7°
.
93
°
Gusset plat t = 10 mm
92
2
.3
.6
Gusset plat t = 10 mm 87
8°
Girder WF 300x300x10x15
Girder WF 300x300x10x15 K-1.4
K-1.2
Welded Welded
6968 3029 3029 6968
Elv +9.684 Elv +9.685
3538 Elv +9.401 3538
Elv +9.400
600 600
600 1000 1000 600
320
320
Elv +8.824
Elv +8.743
1600 1600
0°
95
84 °
60
.4
.6
.4
.
95
0°
0°
84
4476
Bolt M16 mm Bolt M16 mm
2 Pcs. 10mm GI Plate Wing
8 Pcs. M 22mm Machine Anchor Bolt 2 Pcs. 10mm GI Plate Wing
8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate
600x300mm x 20mm Thick GI Base Plate
Welded to WF Steel Column
Welded to WF Steel Column
0.15
0.15
0.15
0.15
Elv +5.000 Elv +5.000
0.50
0.50
Elv +4.800 Elv +4.800
Main Reinforcement 12D16mm Main Reinforcement 12D16mm
1.80
Ø12-200 mm Ø12-200 mm
1.80
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.200 Elv +3.200
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K1 K1
1300
320
320
°
38
78
1.
°
82 .
4
62
10
.6
1700 .3 °
Gusset plat t = 10 mm
97
K-2.1 K-2.3
Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9 Stiffner plat 9 - 2641 mm
Girder WF 300x300x10x15 WF beam 250x125x6x9
Bolt M16 mm Girder WF 300x300x10x15
WF 300x300x10x15 Bolt M16 mm
Welded WF 300x300x10x15
Gusset plat t = 10 mm Welded
7924 3960
600
3647
600
3°
320
80
.6
.3
99
1800 7°
Gusset plat t = 10 mm
°
92
77
2.
10
.0
Girder WF 300x300x10x15 2000
8° Gusset plat t = 10 mm
K-2.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Nugroho Hadi Kumoro
Hariadi S L.Rizal STR.CB.02
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Elv +11.134 Elv +11.134
Bolt M16 mm Bolt M16 mm
5438 5438
Welded 9404 1500 1500 9404 Welded
3552 3552
600 600
320
320
Elv +9.146 Elv +9.133
0°
104
.9
104
.90
°
75 °
.10
2100
° .10 2100
75
Gusset plat t = 10 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
Girder WF 300x300x10x15 WF 400x200x8x13 WF 400x200x8x13 Girder WF 300x300x10x15
4799
Bolt M16 mm Bolt M16 mm
0.15
0.15
0.15
0.15
Elv +5.000 Elv +5.000
0.50
0.50
Elv +4.800 Elv +4.800
Main Reinforcement 12D16mm Main Reinforcement 12D16mm
Ø12-200 mm Ø12-200 mm
1.80
1.80
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.200 Elv +3.200
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K2 K2
2
358 600
320
600
3598
6°
600
7.6
320
72
10
.34
° Gusset plat t = 10 mm
°
2100
55
5.
K-3.3
45
2100 °
Girder WF 300x300x10x15
K-3.1
Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9
Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9 Girder WF 300x300x10x15
Bolt M16 mm
Girder WF 300x300x10x15 733
6 1900
WF 300x300x10x15
Bolt M16 mm 112
28
Welded
WF 300x300x10x15
6532 Gusset plat t = 10 mm
Welded 1042
9 1700
Gusset plat t = 10 mm
600
6
357 600
320
600
4°
3584
8.5
600
320
10
71
.46
° Gusset plat t = 10 mm
7°
6.6
73
10
.33
° Gusset plat t = 10 mm 2100
Girder WF 300x300x10x15
2100
WF beam 250x125x6x9
2000
Girder WF 300x300x10x15
752
7
Welded
Elv +9,943
600
355
600 5
Elv +9,943
320
600 Elv +9,283
10
555
9.3
3
320
600
0°
Elv +9.280 .70°
70
0°
9.3
Gusset plat t = 10 mm
10
70 2046
.70
° Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam
Gusset plat t = 10 mm
2046
WF 400x200x8x13 Girder WF 300x300x10x15
Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam
Bolt M16 mm
Girder WF 300x300x10x15 WF 400x200x8x13
Bolt M16 mm
0.15
Welded to WF Steel Column
0.15
Elv +5.000
0.50
0.15
Elv +4.800
0.15
Elv +5.000
Main Reinforcement 12D16mm
0.50
Elv +4.800 Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Main Reinforcement 12D16mm
Ø12-200 mm
1.80
0.40
D16-200 mm
Elv +3.200
0.10
Pedestal Column 300x600mm
0.40
1.60 0.60 0.80
0.05
Elv +3.200
0.10
Welded
Gusset plat t = 10 mm
600
3
355 600
320
600
9°
0.0
11
69 4
349
320
.91 600
° Gusset plat t = 10 mm
3°
1.4
2000
Girder WF 300x300x10x15
11
68
.5 Gusset plat t = 10 mm
K-4.1
7°
1900
Girder WF 300x300x10x15
K-4.3
Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9
Stiffner plat 9 - 2641 mm
Girder WF 300x300x10x15 2200
804
7 WF beam 250x125x6x9
Bolt M16 mm
84 2400
118 Girder WF 300x300x10x15
WF 300x300x10x15 818
4
6
351 600
320
600
8°
0.7
6
348
320
600
11
69
.22
Gusset plat t = 10 mm
°
4°
2.0
1950 Girder WF 300x300x10x15
11
Gusset plat t = 10 mm
K-4.2
67
.96
°
Bolt M16 mm 55
11.9 Elv +10.060 0.60
0
Welded
0.60
0.320
0
112
Elv +9.389 3.4
55
.70
°
Elv +10.060 0°
0 .3
0.60 67
0.320
0.60
0
Gusset plat t = 10 mm
°
1.80
Elv +9.393
.70
0
55
3.4
112
Plat t = 15 mm, Welded to WF Steel Beam
67
.30 Gusset plat t = 10 mm
° WF 400x200x8x13
Girder WF 300x300x10x15
0
Gusset plat t = 10 mm
1.80
0.15
0.15
Elv +5.000
600x300mm x 20mm Thick GI Base Plate
0.50
Welded to WF Steel Column Elv +4.800
Main Reinforcement 12D16mm
0.15
Ø12-200 mm
1.80
0.15
Elv +5.000
D16-200 mm Stirrup Ø10mm 200mm
0.50
Elv +4.800 Pedestal Column 300x600mm
0.40
Main Reinforcement 12D16mm Elv +3.200
Ø12-200 mm
0.10
1.80
Stirrup Ø10mm 200mm D16-200 mm 1.60 0.60 0.80
0.05
Pedestal Column 300x600mm Lean Concrete T=100mm 3.00
Sandbed T=50mm
0.40
3.20
Elv +3.200
0.10
3.00
3.20
Lean Concrete T=100mm
Sandbed T=50mm K4
K4
0
91 0.60
3.3 0.60
0
5°
3.1
11
0.320
66 0.60
0
.85
° Gusset plat t = 10 mm 3.2
17
6°
4.1
11
65
1.75
0
Girder WF 300x300x10x15 .84
° Gusset plat t = 10 mm
0
0.60
93
3.2 0.60
0
6°
3.6
11
0.320
66 0
.34
° Gusset plat t = 10 mm 3.16
2 0.60
3°
4.6
11
65
1.70
0 Girder WF 300x300x10x15 .37
° Gusset plat t = 10 mm
1.60
0 Girder WF 300x300x10x15
K-5.2 K-5.4
0
Elv +9.857
60
25
8 5
320
60
Elv +10.190 0
320
85
25 60
0
11
Elv +9.172
7.0
°
0°
0
7.0
°
.00
11
63 63
.00
°
Gusset plat t = 10 mm 13
00
1306
Gusset plat t = 10 mm Plat t = 15 mm, Welded to WF Steel Beam
Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam WF 400x200x8x13
Gusset plat t = 10 mm
WF 400x200x8x13 Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
0.15
0.15
Elv +5.000
0.15
0.15
0.50
Elv +5.000
Elv +4.800
0.50
Elv +4.800
Main Reinforcement 12D16mm
Ø12-200 mm
1.80
Main Reinforcement 12D16mm
Ø12-200 mm D16-200 mm Stirrup Ø10mm 200mm
1.80
0.40
Pedestal Column 300x600mm Elv +3.200
0.10
0.40
Elv +3.200
0.10
0.05
0.80 0.60 1.60 Lean Concrete T=100mm 3.00
0.05
K6 K6
WF 300x300x10x15 87
53 WF 300x300x10x15 39
80
Welded Welded
Gusset plat t = 10 mm Gusset plat t = 10 mm
0
0 60
60
00
23
02
320
25
320
0
0 60
60
8°
3°
7.4
7.2
11
11
62 Gusset plat t = 10 mm 62
.52
Gusset plat t = 10 mm
.77
° °
50
1255 11
Girder WF 300x300x10x15 Girder WF 300x300x10x15
K-7.1 K-7.3
Stiffner plat 9 - 2641 mm Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
0
0 60
60
37
22
88
320
23
320
0
0 60
60
5°
7.4
0°
7.4
11
62 Gusset plat t = 10 mm
11
62
Gusset plat t = 10 mm .55
°
.60° 00
11
12
00
Girder WF 300x300x10x15 Girder WF 300x300x10x15
K-7.2 K-7.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.06
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm
Stiffner plat 9 - 2641 mm
Elv +11.844
WF beam 250x125x6x9 Elv +11.844
WF beam 250x125x6x9
Girder WF 300x300x10x15
00
Girder WF 300x300x10x15
57 13
47
Bolt M16 mm 13
00 47
57
45
Bolt M16 mm
73 73
45
Welded
Welded
Elv +9.667
60
0 Elv +9.667
60
0
38
21
320
0 21
60 Elv +8.990 38
320
60
Elv +8.975
0°
0
7.3
11
11
7.3
0
62
°
.70
° °
.70
00
11
Gusset plat t = 10 mm 62 11
Gusset plat t = 10 mm 00
0.15
0.15
0.15
Elv +5.000
0.15
Elv +5.000
0.50
0.50
Elv +4.800
Elv +4.800
Main Reinforcement 12D16mm
Ø12-200 mm Main Reinforcement 12D16mm
1.80
Ø12-200 mm
1.80
Stirrup Ø10mm 200mm D16-200 mm
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
Pedestal Column 300x600mm
0.40
0.40
Elv +3.200
0.10
Elv +3.200
0.10
0.80 0.60 1.60
0.05
0.05
3.00
3.20 Sandbed T=50mm Lean Concrete T=100mm 3.00
Sandbed T=50mm 3.20
K7 K7
Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9
Stiffner plat 9 - 2641 mm
Girder WF 300x300x10x15 WF beam 250x125x6x9
Bolt M16 mm
7 8 Girder WF 300x300x10x15
WF 300x300x10x15 45
12
00
70
1 0 Bolt M16 mm
Welded
WF 300x300x10x15
Gusset plat t = 10 mm 408
9
Welded 635
5 100
0
Gusset plat t = 10 mm
0
60
95
20
320
0
60 600
2
193
1°
7.0
320
600
11
62
.99
Gusset plat t = 10 mm
°
1057
.92
°
5
11
Girder WF 300x300x10x15 64
.0
Gusset plat t = 10 mm
900 8°
Girder WF 300x300x10x15
K-8.1
Stiffner plat 9 - 2641 mm
K-8.3
WF beam 250x125x6x9
Stiffner plat 9 - 2641 mm
Girder WF 300x300x10x15 WF beam 250x125x6x9
Bolt M16 mm
Girder WF 300x300x10x15
WF 300x300x10x15 1
434 0 Bolt M16 mm
2 110
Welded 668
WF 300x300x10x15
Gusset plat t = 10 mm 8
Welded 4 381
602 900
Gusset plat t = 10 mm
600
6
200
320
0
60 600
5
187
5 °
6.5
320
600
11
63
.45 Gusset plat t = 10 mm
10
00 °
K-8.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.07
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
Elv +10.319 Welded
Welded 2372 4286
Elv +10.319
4286 2372
550
Elv +9.708 1500
550
Elv +9.708 600
1500
600 600
320
600 Elv +9.056
320
10
.00
Elv +9.067
5.
10 5
00
550
0°
°
.0
550 75 75
.00
°
Gusset plat t = 10 mm
Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam
Plat t = 15 mm, Welded to WF Steel Beam Gusset plat t = 10 mm
Gusset plat t = 10 mm WF 400x200x8x13
WF 400x200x8x13 Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
0.15
0.15
Elv +5.000
Elv +5.000
0.50
Elv +4.800
0.50
Elv +4.800
Main Reinforcement 12D16mm
Ø12-200 mm
1.40
1.80
Stirrup Ø10mm 200mm
1.80
D16-200 mm
Pedestal Column 300x600mm
0.40
Elv +3.200
0.40
0.10
Elv +3.200
0.10
0.05
0.80 0.60 1.10 Lean Concrete T=100mm 3.00
0.05
K9 K9
320
400
°
3°
83
32
500
.2
77 .7
2.
96
.6 7°
10
320
320
350
450 86
7°
°
80
11
.8
.3
.6 9°
.
99
93
3°
Gusset plat t = 10 mm Gusset plat t = 10 mm
K-10.2 K-10.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.08
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9 WF beam 250x125x6x9
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Bolt M16 mm Bolt M16 mm
Welded Welded
3385 3385
1772 1213 1213 1772
Elv +10.017 Elv +10.017
600 600
600 600
320
300
320
300 300
300
Elv +9.375 Elv +9.398
0°
90
90
°
.0
0
.0
.0
.0
90
0°
90
0°
Gusset plat t = 10 mm Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
Gusset plat t = 10 mm Gusset plat t = 10 mm
WF 400x200x8x13 WF 400x200x8x13
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Bolt M16 mm Bolt M16 mm
0.50
Elv +4.803
0.50
Elv +4.803
1.40
1.40
1.80
1.80
0.40
Elv +3.200
0.40
0.10 Elv +3.200
0.10
0.05 0.80 0.60 1.10
0.80 0.60 1.10
2.50
0.05
2.70 2.50
2.70
K10 K10
WF beam 250x125x6x9
Girder WF 300x300x10x15
Bolt M16 mm
WF 300x300x10x15
Welded WF beam 250x125x6x9
Gusset plat t = 10 mm Girder WF 300x300x10x15
3279
1189
Bolt M16 mm
1790
WF 300x300x10x15
28
600
600
3132 Welded
0
985
320
350
Gusset plat t = 10 mm
1843
9°
93
600
.7
.2
86
1
150 600
°
Gusset plat t = 10 mm
320
K-11.1 450
99
Girder WF 300x300x10x15 0°
.6
.4
0°
80
Gusset plat t = 10 mm
Girder WF 300x300x10x15
K-11.3
WF beam 250x125x6x9
Girder WF 300x300x10x15
Bolt M16 mm
WF 300x300x10x15
Welded WF beam 250x125x6x9
Gusset plat t = 10 mm Girder WF 300x300x10x15
3193
1093
Bolt M16 mm
1798 WF 300x300x10x15
200
600
600
853 3096
Welded
320
400
Gusset plat t = 10 mm
1935
600
96
0°
.4
100
.6
0°
600
83 Gusset plat t = 10 mm
320
K-11.2
10
500
Girder WF 300x300x10x15
2.
70
0°
.3
°
Gusset plat t = 10 mm 77
Girder WF 300x300x10x15
K-11.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Nugroho Hadi Kumoro
Hariadi S L.Rizal STR.CB.09
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
Welded
Welded
622
3092
Elv +10.923 622
3092 Elv +10.923
Elv +10.756 600 2054
2054 600
50
600
Elv +10.756
320
50
600
320
10
Elv +10.075 Elv +10.128
5.9
0°
5.9
0°
°
10
10
. 74
74
550
.10
550 °
Gusset plat t = 10 mm
Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam
Gusset plat t = 10 mm Plat t = 15 mm, Welded to WF Steel Beam
WF 400x200x8x13 Gusset plat t = 10 mm
Girder WF 300x300x10x15 WF 400x200x8x13
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
Elv +5.000
Elv +5.000
0.50
Elv +4.824
0.50
Elv +4.824
1.40
1.80
1.40
1.80
0.40
Elv +3.200
0.40
0.10
Elv +3.200
0.10
0.80 0.60 1.10
0.05
2.50 0.80 0.60 1.10
0.05
2.70 2.50
2.70
K11 K11
WF beam 250x125x6x9
Girder WF 300x300x10x15
WF beam 250x125x6x9 Bolt M16 mm
WF 300x300x10x15
Girder WF 300x300x10x15
701 Welded
Bolt M16 mm 331 Gusset plat t = 10 mm
9
WF 300x300x10x15 600
50
701
Welded 229
1
320
600
11
314
2 Gusset plat t = 10 mm
3.6
0°
600
212
4 °
50
600 Gusset plat t = 10 mm 66
.40
320
700
10
Girder WF 300x300x10x15
8.
K-12.3
60
.4 0°
°
Girder WF 300x300x10x15
K-12.1
WF beam 250x125x6x9
Girder WF 300x300x10x15
WF beam 250x125x6x9 Bolt M16 mm
WF 300x300x10x15
Girder WF 300x300x10x15
672 Welded
Bolt M16 mm Gusset plat t = 10 mm
341
WF 300x300x10x15 600 7
50
686 Welded 241
320
322 600 1
0
11
Gusset plat t = 10 mm
6.1
0°
600
50 221
2
Gusset plat t = 10 mm .90
°
600 63
320
11
7
1.3
75500
Girder WF 300x300x10x15
K-12.4
0°
0°
Gusset plat t = 10 mm 68
.7
650
Girder WF 300x300x10x15
K-12.2
320
25 2
1 1
11
60 1 0
Elv +10.743 0 35 60
Elv +11.385
7.2
50
0°
320
1
25
1 Elv +10.796
0°
0
60
7.2
°
.80
11
62
80
0 62
.80
°
Elv +5.000
0.50
Elv +4.832
Elv +5.000
0.50
1.40
Elv +4.832
1.80
1.40
1.80
0.40
Elv +3.200
0.10
0.40
0.80 0.60 1.10
Elv +3.200
0.05
0.10
2.50
2.70 0.80 0.60 1.10
0.05
2.50
K12 2.70
K12
WF beam 250x125x6x9
WF beam 250x125x6x9 Girder WF 300x300x10x15
Girder WF 300x300x10x15 Bolt M16 mm
Bolt M16 mm WF 300x300x10x15
10
WF 300x300x10x15
50 Welded
Welded 20 38 Gusset plat t = 10 mm
76 0 69
3 60
0
Gusset plat t = 10 mm
36
26
320
10 60 24
0 0
60 72
12
0
0.1
0°
320
60 25
0 22
11
Gusset plat t = 10 mm
8.5
0°
°
.90
Gusset plat t = 10 mm 59
61
.50
° Girder WF 300x300x10x15 95
0
Girder WF 300x300x10x15
K-13.1
85
0
K-13.3
WF beam 250x125x6x9
WF beam 250x125x6x9 Girder WF 300x300x10x15
Girder WF 300x300x10x15 Bolt M16 mm
Bolt M16 mm WF 300x300x10x15
11
WF 300x300x10x15
47 Welded
91 Welded 25
0 39 Gusset plat t = 10 mm
7 89
60
0
Gusset plat t = 10 mm
15
0 60 37
46
320
0
60 24
0 95
12
0.3
320
60 24
0°
0 85
11
Gusset plat t = 10 mm
9.4
°
.70
0°
59
Gusset plat t = 10 mm °
60
.60 Girder WF 300x300x10x15 10
00
Girder WF 300x300x10x15
K-13.2
90
0
K-13.4
Elv +11.881 11
87 Welded Bolt M16 mm
41
08 Welded 8 7 Elv +11.881
Elv +11.283
30
0 11
60
0
08
41 30
0
Elv +11.283
320
24 60
0
Elv +10.643 56
12
60
0
0.6
0°
320
56 Elv +10.652
0°
24 60
0
0.6
°
12
.40
59
10
50
59
.40
°
Gusset plat t = 10 mm Gusset plat t = 10 mm 50
10
Elv +5.000
0.50
Elv +4.814
Elv +5.000
1.40
Elv +4.824
0.50
1.80
1.40
1.80
0.40
Elv +3.200
0.10
0.40
Elv +3.200
0.05
0.10
2.50
2.70
0.80 0.60 1.10
0.05
2.50
2.70
K13
K13
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
WF 300x300x10x15
13 WF 300x300x10x15 15
00
49
Welded
Welded
44
3 Gusset plat t = 10 mm
40
0
42
24 Gusset plat t = 10 mm 60
0
60
1
0
60
0
320
25
25 60 88
320
0
60 28
0
11
12
9.0
0.3
0°
0°
Gusset plat t = 10 mm
Gusset plat t = 10 mm .00
°
0° 61
.7 12
59 00
Girder WF 300x300x10x15
Girder WF 300x300x10x15 1
K-14.1
11 100
00
K-14.3
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
WF 300x300x10x15
WF 300x300x10x15 15
25
14
36 Welded
Welded
70 45
09 Gusset plat t = 10 mm
50
0 43
31
Gusset plat t = 10 mm 0
60
60 0
0
320
26
60 45
320
0
60 25
11
0
49
7.7
12
0
0°
.00
Gusset plat t = 10 mm 0°
°
Gusset plat t = 10 mm ° 62
.3
.00
60
Girder WF 300x300x10x15 12
50
Girder WF 300x300x10x15 11
K-14.4
11 50
50
K-14.2
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.12
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
WF beam 250x125x6x9 WF beam 250x125x6x9
4
459
4 459 0 Elv +10.726
Elv +10.726 800
600 600
80
320
664
320
26 2 600
600 64 Elv +8.033
Elv +10.096
0°
11
6.5
6.5
11
0°
63
° .50
.50 °
63 130 13
00
0
0.50
0.50
Elv +4.814 Elv +4.814
1.40
1.40
1.80
1.80
0.40
0.40
Elv +3.200 Elv +3.200
0.10
0.10
0.80 0.60 1.10
0.80 0.60 1.10
0.05
0.05
2.50
2.50
2.70
2.70
K14 K14
WF beam 250x125x6x9
Girder WF 300x300x10x15 WF beam 250x125x6x9
Bolt M16 mm
Girder WF 300x300x10x15
193 WF 300x300x10x15
8 Bolt M16 mm
466 Welded
1 272 WF 300x300x10x15
900 Gusset plat t = 10 mm 9
477
600
2 Welded
239
2
1100
Gusset plat t = 10 mm
320
600
600 172
3
11
4.8
0°
600
320
Gusset plat t = 10 mm 5.2
0 °
11
6
0.2
110
0
°
0°
700
Gusset plat t = 10 mm .80
Girder WF 300x300x10x15 69
K-15.3
WF beam 250x125x6x9
Girder WF 300x300x10x15 WF beam 250x125x6x9
Bolt M16 mm
Girder WF 300x300x10x15
WF 300x300x10x15
243
6 471 Bolt M16 mm
7 Welded
10
08 309 483
WF 300x300x10x15
Gusset plat t = 10 mm 1 4
Welded
600
0
228
1 Gusset plat t = 10 mm
320
600 1428
600
11
2.7
600
320
0°
K-15.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.13
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm
Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Elv +9.909 4896
Bolt M16 mm
3362 Elv +9.909
Welded 4896
Welded 3362
1300
1119
Elv +9.030 1300
600
1119 Elv +9.030
600 600
320
600
Elv +8.343
320
400
10
Elv +8.332
5.
0°
20
°
400
20
.8
°
Gusset plat t = 10 mm 74 74
5.
.8
10
0°
Gusset plat t = 10 mm
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm Gusset plat t = 10 mm
Gusset plat t = 10 mm Bolt M16 mm
Plat t = 15 mm, Welded to WF Steel Beam
Plat t = 15 mm, Welded to WF Steel Beam
WF 400x200x8x13
WF 400x200x8x13
2 Pcs. 10mm GI Plate Wing
8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate
0.15
Welded to WF Steel Column
0.15
Elv +5.000
Elv +5.000
0.50
Elv +4.800
0.50
Elv +4.800
Main Reinforcement 12D16mm
1.40
Ø12-200 mm
1.80
1.40
D16-200 mm Stirrup Ø10mm 200mm
1.80
Pedestal Column 300x600mm
0.40
Elv +3.200
0.10
0.40
Elv +3.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50 0.80 0.60 1.10
0.05
Sandbed T=50mm 2.70
2.50
2.70
K15 K15
600
600
450
320
10
2.
0°
80
550
.2
°
10
Gusset plat t = 10 mm 77
0.
0°
20
.8
79
°
Gusset plat t = 10 mm
Girder WF 300x300x10x15
Girder WF 300x300x10x15
K-15A.1 K-15A.3
1165
Gusset plat t = 10 mm Welded
1500
600 1274 Gusset plat t = 10 mm
600 1700
600
320
600
500
320
10
600
1.
0°
20
10
Gusset plat t = 10 mm .8
°
78
0.
0 °
00
.0
80
°
Gusset plat t = 10 mm
Girder WF 300x300x10x15
K-15A.2 Girder WF 300x300x10x15
K-15A.4
Girder WF 300x300x10x15
Bolt M16 mm
Welded 5405
3696
Elv +8.842
1302
1800
Elv +8.158
600
600
Gusset plat t = 10 mm
320
Girder WF 300x300x10x15 Elv +7.451
°
600
70
79
0.
.3
0° Bolt M16 mm
10
Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam
WF 400x200x8x13
Elv +5.000
0.50
Elv +4.800
1.40
1.80
0.40
Elv +3.200
0.10
0.80 0.60 1.10
0.05
2.50
2.70
K15A
Girder WF 300x300x10x15
Bolt M16 mm
5405
Elv +8.842 3696 Welded
1302
Elv +8.158 1800
600
600
320
Elv +7.451 Gusset plat t = 10 mm 600
10
0°
0.
Girder WF 300x300x10x15
70
.3
79
°
Bolt M16 mm
Gusset plat t = 10 mm
2 Pcs. 10mm GI Plate Wing Plat t = 15 mm, Welded to WF Steel Beam
8 Pcs. M 22mm Machine Anchor Bolt WF 400x200x8x13
600x300mm x 20mm Thick GI Base Plate
0.15
Welded to WF Steel Column
0.15
Elv +5.000
0.50
Elv +4.800
Main Reinforcement 12D16mm
1.40
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +3.200
0.10
1.10 0.60 0.80
Lean Concrete T=100mm 2.50 0.05
Sandbed T=50mm 2.70
K15A
8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate 600x300mm x 20mm Thick GI Base Plate
Welded to WF Steel Column Welded to WF Steel Column
5152 5152
2083 2669
2669 2083
125
600 600
Elv +5.420 Elv +5.420 600 600
0.50
0.50
650 654
320
320
650 650
Elv +5.205 Elv +5.205
Main Reinforcement 12D16mm Main Reinforcement 12D16mm
0°
1.40
1.40
Ø12-200 mm Ø12-200 mm
90
.0
90
.0
1.80
1.80
0°
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.600 Elv +3.600
0.10
0.10
0.80 0.60 1.10 1.10 0.60 0.80
0.05
0.05
2.50 Lean Concrete T=100mm Lean Concrete T=100mm 2.50
2.70 Sandbed T=50mm Sandbed T=50mm 2.70
K-16A.1 K-16A.1
650
650 662
650
3°
92
°
90
00
.1
.8
.0
87
7°
.
90
0°
K-16A.2 K-16A.4
650
650
650
93
° 6° 650
.1
.8
91
.1
88
86
4°
.9
0°
K-16A.3 K-16A.5
8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate 600x300mm x 20mm Thick GI Base Plate
Welded to WF Steel Column 5389 5389 Welded to WF Steel Column
2334 2334
Elv +6.084
2654 2654
Elv +5.889
81
600 Elv +5.733 600
600 600
650 650
Elv +5.420 Elv +5.420
320
320
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
0.50
0.50
650 650
Elv +5.198 Elv +5.198
94
2
85
8°
.8
.8
.1
94
.1
2
8°
°
Main Reinforcement 12D16mm 85 Main Reinforcement 12D16mm
1.40
1.40
Ø12-200 mm Ø12-200 mm
1.80
1.80
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.600 Elv +3.600
0.10
0.10
0.80 0.60 1.10 1.10 0.60 0.80
0.05
0.05
2.50 Lean Concrete T=100mm Lean Concrete T=100mm 2.50
2.70 Sandbed T=50mm Sandbed T=50mm 2.70
K-16A.6 K-16A.6
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
Plat t = 10 mm, Welded to WF Steel Beam
5298 Plat t = 10 mm, Welded to WF Steel Beam
5318
2324
2345
2673
2671
650
650
662
95
7 °
.5
.4
84
3
650
°
96
5°
.8
.1
5°
83
K-16A.7 K-16A.9
WF beam 250x125x6x9
WF beam 250x125x6x9
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
Plat t = 10 mm, Welded to WF Steel Beam
Plat t = 10 mm, Welded to WF Steel Beam
5275
2308 5385
2389
2665
2693
650
650
662
96
97
0
1°
.2
.8
.4
0°
83 .5 650
9°
82
K16A.8 K-16A.10
Welded 5451
Welded
5451 2368
Gusset plat t = 10 mm 2368 Elv +6.614 Gusset plat t = 10 mm
2679 Elv +6.278 2679
600 600
650 650
600
Elv +6.087 600
917
320
320
Elv +5.420 Elv +5.420
8°
98
81
2°
.1
650
.1
650 .8 .8
98
2°
8°
0.50
0.50
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam 81
WF beam 250x125x6x9 Elv +5.106 Elv +5.106 WF beam 250x125x6x9
1.50
1.50
Main Reinforcement 12D16mm
Ø12-200 mm Ø12-200 mm
1.90
1.90
Stirrup Ø10mm 200mm Stirrup Ø10mm 200mm
D16-200 mm D16-200 mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.500 Elv +3.500
0.10
0.10
0.80 0.60 1.10 1.10 0.60 0.80
0.05
0.05
2.50 Lean Concrete T=100mm Lean Concrete T=100mm 2.50
2.70 Sandbed T=50mm Sandbed T=50mm 2.70
K16A K16A
2685
2702
600
600 650
650 600
600
320
320
98
WF 300x300x10x15 9°
.8
98
WF 300x300x10x15 2°
650
.1 650
1°
.3
1.
6 81
8°
8
Girder WF 300x300x10x15 Girder WF 300x300x10x15
K-16B.1 K-16B.3
2689 2694
650 600
650 600
600
600
320
320
99
0°
.1
650
WF 300x300x10x15 650
98
WF 300x300x10x15 .9
0
°
80
°
2
.
58
.4
81
°
K-16B.2 K-16B.4
2716
Elv +6.864 2716
600 650 600
650
600 600
320
320
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
Elv +6.203
1511
2 Pcs. 10mm GI Plate Wing 2 Pcs. 10mm GI Plate Wing
9°
99
Gusset plat t = 10 mm 80 Gusset plat t = 10 mm
.4
.4
8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt 1°
99
.5
9°
650
650
1 .5
° 80
Bolt M16 mm Bolt M16 mm
0.15
0.15
600x300mm x 20mm Thick GI Base Plate 600x300mm x 20mm Thick GI Base Plate
0.15
0.15
WF 400x200x8x13 Welded to WF Steel Column Elv +5.420 Elv +5.420 Welded to WF Steel Column WF 400x200x8x13
0.50
0.50
Elv +5.048 Elv +5.048
1.50
1.50
Main Reinforcement 12D16mm
Ø12-200 mm. Ø12-200 mm.
1.90
1.90
Stirrup Ø10mm 200mm Stirrup Ø10mm 200mm
D16-200 mm D16-200 mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.500 Elv +3.500
0.10
0.10
0.80 0.60 1.10 1.10 0.60 0.80
0.05
0.05
2.50 Lean Concrete T=100mm Lean Concrete T=100mm 2.50
2.70 Sandbed T=50mm Sandbed T=50mm 2.70
K16B K16B
Girder WF 300x300x10x15
650
Gusset plat t = 10 mm 600
600
99
320
WF 300x300x10x15 °
.
40
60
80
.
650
Gusset plat t = 10 mm
°
Girder WF 300x300x10x15
10
0.
WF 300x300x10x15 9°
31
.6 650
79
°
K-16.1 Girder WF 300x300x10x15
K-16.3
Girder WF 300x300x10x15
650
Gusset plat t = 10 mm 600
600
320
99
WF 300x300x10x15
.8
1 ° 650
Gusset plat t = 10 mm
9°
.1
80
10
Girder WF 300x300x10x15
0.
WF 300x300x10x15 6°
84
.1 662
79
°
Girder WF 300x300x10x15
K-16.2 K-16.4
650
Elv +7.629 650 2813
2813 600 600
600 600
320
320
Elv +7.010
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
10
°
46
1.
78
1.
4°
2286
46
Gusset plat t = 10 mm
650 .5 Gusset plat t = 10 mm
650
10
4° .5
°
2 Pcs. 10mm GI Plate Wing 2 Pcs. 10mm GI Plate Wing 78
WF 400x200x8x13 8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt WF 400x200x8x13
Bolt M16 mm 600x300mm x 20mm Thick GI Base Plate 600x300mm x 20mm Thick GI Base Plate Bolt M16 mm
0.15
0.15
Welded to WF Steel Column Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +5.022 Elv +5.022
1.50
1.50
Ø12-200 mm Ø12-200 mm Main Reinforcement 12D16mm
1.90
1.90
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.500 Elv +3.500
0.10
0.10
0.80 0.60 1.10 1.10 0.60 0.80
0.05
0.05
2.50 Lean Concrete T=100mm Lean Concrete T=100mm 2.50
2.70 Sandbed T=50mm Sandbed T=50mm 2.70
K16 K16
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Welded Bolt M16 mm
700
2813
600 800
320
10
Gusset plat t = 10 mm
2.
WF 300x300x10x15 7°
13
.8
10
77
°
700
3
WF 300x300x10x15
.6
Girder WF 300x300x10x15 2°
8 °
.3
76 800
Girder WF 300x300x10x15
K-17.1 K-17.3
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Welded Bolt M16 mm
Gusset plat t = 10 mm Welded
750
600 2821 850
320
10
Gusset plat t = 10 mm
2.
WF 300x300x10x15 2°
88
10
.1
°
77
4.
WF 300x300x10x15 6°
54
750
Girder WF 300x300x10x15 .4
°
75
K-17.2
859
Girder WF 300x300x10x15
K-17.4
900 900
Elv +8.504
600 600
2893
2893
600 600
320
320
Elv +7.900
10
°
43
5.
74
5.
8°
4
.5
10
3°
8° .5
74
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
Gusset plat t = 10 mm
900 900
Gusset plat t = 10 mm
3169
WF 400x200x8x13 WF 400x200x8x13
2 Pcs. 10mm GI Plate Wing 2 Pcs. 10mm GI Plate Wing
Bolt M16 mm Bolt M16 mm
8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate 600x300mm x 20mm Thick GI Base Plate
Welded to WF Steel Column Welded to WF Steel Column
0.15
0.15
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +5.023 Elv +5.023
1.90
1.90
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.500 Elv +3.500
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K17 K17
600
2852 600
282
600 6
320
600
Gusset plat t = 10 mm
320
10
Gusset plat t = 10 mm
6.3
10
WF 300x300x10x15 °
8.1
2°
8
.6 WF 300x300x10x15
2°
73 °
.88
Girder WF 300x300x10x15 909 71
Girder WF 300x300x10x15
K-18.1
900
K-18.3
600
2840 600
281
600 5
320
320
Gusset plat t = 10 mm
10
7.2
10
WF 300x300x10x15 °
2°
9.0
.78 WF 300x300x10x15
72
1°
°
Girder WF 300x300x10x15 909 .99
70
Girder WF 300x300x10x15
K-18.2
900
K-18.4
1 285
285 1
320
320
600
600
Elv +8.740
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
10
9°
9.8
9.8
10
9°
70
.11 .11°
° 70
900
Gusset plat t = 10 mm Gusset plat t = 10 mm 900
4006
WF 400x200x8x13 Bolt M16 mm Bolt M16 mm WF 400x200x8x13
0.15
0.15
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +5.096 Elv +5.096
1.90
1.90
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.500 Elv +3.500
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K18 K18
600
600
276
7 269
600 0
320
320
600
Gusset plat t = 10 mm Gusset plat t = 10 mm
11
11
0.8
2.6
WF 300x300x10x15 WF 300x300x10x15
4°
4°
° °
.16 .36
69 67
Girder WF 300x300x10x15 Girder WF 300x300x10x15
859
800
K-19.1 K-19.3
600 600
272
9 265
2
320
600
320
600
Gusset plat t = 10 mm Gusset plat t = 10 mm
11
11
1.7
3.5
WF 300x300x10x15 WF 300x300x10x15
5°
1°
.25 °
68 .49
Girder WF 300x300x10x15 Girder WF 300x300x10x15 66
850 134
8
K-19.2 K-19.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.22
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm Stiffner plat 9 - 2641 mm
Elv +12.151
WF beam 250x125x6x9 WF beam 250x125x6x9
Welded Welded
Elv +10.000
600
600
1 268
268 1
320
320
600 Elv +9.419 600
11
4°
4.3
4.3
11
4°
65 °
.66 .66
° 65
Gusset plat t = 10 mm Gusset plat t = 10 mm
750
750
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Bolt M16 mm Bolt M16 mm
4661
Gusset plat t = 10 mm Gusset plat t = 10 mm
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam
WF 400x200x8x13 WF 400x200x8x13
0.15
0.15
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +5.056 Elv +5.056
1.90
1.90
Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.500 Elv +3.500
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K19 K19
Bolt M16 mm 17 59
Bolt M16 mm
00 37
150
0
549
9
Welded 87
11 Welded
838
0 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
600 60
0
254 24
37
9
320
320
600 60
0
Gusset plat t = 10 mm Gusset plat t = 10 mm
11
11
7.0
5.3
WF 300x300x10x15 WF 300x300x10x15
3°
0°
°
Girder WF 300x300x10x15 .70 Girder WF 300x300x10x15 °
64 .97
62
K-20.1
750 75
K-20.3
0
Bolt M16 mm 18
00
61
58
Bolt M16 mm
160
0 571
7 Welded 88
93 Welded
854
1 Gusset plat t = 10 mm Gusset plat t = 10 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
600 60
0
249 23
96
0
320
320
600 60
Gusset plat t = 10 mm Gusset plat t = 10 mm 0
11
11
6.2
7.7
WF 300x300x10x15
0°
WF 300x300x10x15
9°
°
.80
Girder WF 300x300x10x15 63 Girder WF 300x300x10x15 .21
°
62
750 75
0
K-20.2 K-20.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.23
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Elv +13.544
Welded Welded
Elv +10.478
0.6
00 00
0.6
0.320
0.320
Elv +9.867 2.4
29 00
0.6
00 29
11
3°
2.4 0.6
8.9
8.9
11
3°
61 7 °
.07
° 6 1.0
5.118
Gusset plat t = 10 mm Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam Gusset plat t = 10 mm
WF 400x200x8x13 WF 400x200x8x13
0.15
0.15
Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +5.016 Elv +5.016
2.00
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K20 K20
2.2
0.320
0.6 80
Gusset plat t = 10 mm 00 0.6
11
00
9.3
WF 300x300x10x15
0°
2.1
0.320
° 69
.70 Gusset plat t = 10 mm
12
0.6
00
60
Girder WF 300x300x10x15
0.6
0°
WF 300x300x10x15
0.7 °
.40
00
Girder WF 300x300x10x15 59
K-21.1 0.7
00
K-21.3
Stiffner plat 9 - 2641 mm
2.0
00
Girder WF 300x300x10x15 2.1
00 Stiffner plat 9 - 2641 mm
6.8
75 Bolt M16 mm Girder WF 300x300x10x15
9.4 7.3
33 Welded 75
9.8
Bolt M16 mm
Gusset plat t = 10 mm 77
Welded
WF beam 250x125x6x9
Gusset plat t = 10 mm
WF beam 250x125x6x9
0.6
00
2.2
0.320
0.6 12
Gusset plat t = 10 mm 00 0.6
12
00
0.0
0°
WF 300x300x10x15
0.320
2.1
.0 0° Gusset plat t = 10 mm 0.6
00
52
12
Girder WF 300x300x10x15 60
1.1
WF 300x300x10x15
0°
0.7
00
Girder WF 300x300x10x15 °
K-21.2 58
.90
0.7
0 0
K-21.4
2.1
50 50
2.1
Welded Welded
0
Elv +10.753 0.6
0 00
0.6
0.320
0.320
Elv +10.187 2.2
12
1°
65
0.6
00 0 65
1.5
0.6 0
2.2
1.5
12
1°
58 9°
.49 .4
° 58
Gusset plat t = 10 mm Gusset plat t = 10 mm
0.7
00 00
0.7
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Bolt M16 mm Bolt M16 mm
Gusset plat t = 10 mm Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam Gusset plat t = 10 mm
5.418
WF 400x200x8x13 WF 400x200x8x13
0.15
0.15
Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +4.973 Elv +4.973
2.00
2.00
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K21 K21
2.2
00
2.0
0.320
00
2.0
0.6
00
WF 300x300x10x15
0°
1.9
Girder WF 300x300x10x15 85
0.320
°
.00 Gusset plat t = 10 mm
58 0.6
00
12
2.5
0.6
50 WF 300x300x10x15
2°
K-22.1 Girder WF 300x300x10x15
57
.48
°
0.4
50
K-22.3
2.2
50
8.1
65 Girder WF 300x300x10x15
10
.52
7
Bolt M16 mm 8.4
Stiffner plat 9 - 2641 mm
74
10
Welded .83
3
Girder WF 300x300x10x15
Gusset plat t = 10 mm Bolt M16 mm
WF beam 250x125x6x9 Welded
Gusset plat t = 10 mm
WF beam 250x125x6x9
0.6
00
2.0
0.320
07
Gusset plat t = 10 mm 0.6
00
12
0.6
2.3
00
WF 300x300x10x15
3°
2.0
0.320
Girder WF 300x300x10x15 .67
°
Gusset plat t = 10 mm 0.6
03
12
57 00
2.5
WF 300x300x10x15
9°
0.4
50
K-22.2 0.4
50
K-22.4
K22
2.4
00 00
2.4
1 8.4
8 .48 81
Welded Welded
0.320
0.320
2.1
57 Elv +10.008 57
2.1
122
°
0.6
.55
0 0 00
0.6
.5
122
5°
57 °
.45 .45
° 57
Gusset plat t = 10 mm Gusset plat t = 10 mm
0.4
50 Girder WF 300x300x10x15 Girder WF 300x300x10x15 0.4
50
5.255
Gusset plat t = 10 mm Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam Gusset plat t = 10 mm
WF 400x200x8x13 WF 400x200x8x13
0.15
Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +4.930 Elv +4.930
2.00
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K22
2.4
00
2.4
00
Welded Welded
Gusset plat t = 10 mm Gusset plat t = 10 mm
0.6
0.6 00
00
1.9 1.8
44
0.320
47
0.320
12
WF 300x300x10x15
2.4
1.6
WF 300x300x10x15
2°
8°
Girder WF 300x300x10x15 Girder WF 300x300x10x15 °
.32
8° 58
.5 0.5
57 00
2.4
00
K-23.1 2.4
K-23.3
00
0.6
0.6 00
00
1.8
52
0.320
1.8
0.320
75
Gusset plat t = 10 mm Gusset plat t = 10 mm 0.6
00
12
0.6
12
00
1.0
2.1
WF 300x300x10x15
9°
WF 300x300x10x15
3°
K-23.2 K-23.4
2.4
00 00
2.4
8.6
Stiffner plat 9 - 2641 mm 62 62 Stiffner plat 9 - 2641 mm
8.6
11
.117 .11
11 7
WF beam 250x125x6x9 WF beam 250x125x6x9
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Welded Welded
00
Elv +10.002 0.6
00
0.6
0.320
0.320
2 1.9
.99 Elv +9.399 0.6 92
12
3°
0
1 0 .60 00
0.3
0.3
12
3°
59 7°
.67 .6
° 59
00
Gusset plat t = 10 mm Gusset plat t = 10 mm 0.5
00
0.5
4.654
Gusset plat t = 10 mm Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam Gusset plat t = 10 mm
WF 400x200x8x13 WF 400x200x8x13
0.15
Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +4.885 Elv +4.885
2.00
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K23 K23
2.3
00
2.10
Stiffner plat 9 - 2641 mm
0
0.60
0
1.6
81
0.6
0.320
03
0.60
1.7 Gusset plat t = 10 mm 0
11
81
7.0
0.320
7°
0
11
°
Girder WF 300x300x10x15 .93
9.4
WF 300x300x10x15 62
6°
0.55
0
Girder WF 300x300x10x15 .54
°
60 0.55
0
K-24.3
K-24.1
Stiffner plat 9 - 2641 mm
2.20
0 2.00
Stiffner plat 9 - 2641 mm 0
Girder WF 300x300x10x15
8.4
Girder WF 300x300x10x15 7.8 Bolt M16 mm
58 53 9.8
10 90
.50
7
Bolt M16 mm Welded
Welded Gusset plat t = 10 mm
Gusset plat t = 10 mm WF beam 250x125x6x9
WF beam 250x125x6x9
0.60
0
1.7
04
0.320
0.60
0 0.60
1.7 Gusset plat t = 10 mm 0
11
08
5
0.320
.63
Gusset plat t = 10 mm 0.60
0 WF 300x300x10x15
°
11
Girder WF 300x300x10x15
8.3
°
WF 300x300x10x15 .37
0.55
0
64
6°
°
Girder WF 300x300x10x15 61
.64
0.55
0
K-24.2 K-24.4
Welded Welded
Elv +8.545
600
600
3 184
184 3
320
320
600 Gusset plat t = 10 mm Elv +7.870 Gusset plat t = 10 mm 600
11
7°
Girder WF 300x300x10x15 Girder WF 300x300x10x15
4 .0
4.0
11
7
65
°
°
.93 .93
°
Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam 65 550
550
3198
Gusset plat t = 10 mm Gusset plat t = 10 mm
2 Pcs. 10mm GI Plate Wing 2 Pcs. 10mm GI Plate Wing
Bolt M16 mm 8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt Bolt M16 mm
WF 400x200x8x13 600x300mm x 20mm Thick GI Base Plate 600x300mm x 20mm Thick GI Base Plate WF 400x200x8x13
Welded to WF Steel Column
0.15
0.15
Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +4.843 Elv +4.843
2.00
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K24 K24
WF beam 250x125x6x9
0.60 170
0 3
173
600 2
0.60
320
0
Gusset plat t = 10 mm 600
320
11
Gusset plat t = 10 mm
2.4
WF 300x300x10x15
2°
WF 300x300x10x15
10
Girder WF 300x300x10x15 8°
8.8
.5 550
67 550
2°
Girder WF 300x300x10x15 .18
°
71
K-25.1 K-25.3
Stiffner plat 9 - 2641 mm
Stiffner plat 9 - 2641 mm
Girder WF 300x300x10x15
Girder WF 300x300x10x15
Bolt M16 mm
Bolt M16 mm
646
Welded
1800
4 847 Welded
3
Gusset plat t = 10 mm
Gusset plat t = 10 mm
WF beam 250x125x6x9 5686 7830
1700 WF beam 250x125x6x9
600 168
9
1830
600
600
320
320
11
Gusset plat t = 10 mm
0.6
WF 300x300x10x15
7°
.33
° WF 300x300x10x15
10
550
Girder WF 300x300x10x15 69
6.9
550
Girder WF 300x300x10x15
0°
°
.10
73
K-25.2
K-25.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro STR.CB.28
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm Stiffner plat 9 - 2641 mm
WF beam 250x125x6x9 WF beam 250x125x6x9
600 600
320
320
Plat t = 15 mm, Welded to WF Steel Beam Elv +6.929 Plat t = 15 mm, Welded to WF Steel Beam
10
5°
4.9
4.9
10
5°
75
5°
2244
550
.0
5° 2 Pcs. 10mm GI Plate Wing 2 Pcs. 10mm GI Plate Wing 75
.0 550
8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt
Gusset plat t = 10 mm 600x300mm x 20mm Thick GI Base Plate Gusset plat t = 10 mm
WF 400x200x8x13 600x300mm x 20mm Thick GI Base Plate WF 400x200x8x13
Bolt M16 mm Welded to WF Steel Column Bolt M16 mm
0.15
0.15
Welded to WF Steel Column
0.15
0.15
Elv +5.420 Elv +5.420
0.50
0.50
Elv +4.788 Elv +4.788
Main Reinforcement 12D16mm 2.00 Main Reinforcement 12D16mm
2.00
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.60 1.60 0.60 0.80
0.05
0.05
3.00 Lean Concrete T=100mm Lean Concrete T=100mm 3.00
3.20 Sandbed T=50mm Sandbed T=50mm 3.20
K25 K25
600
3.
600
Girder WF 300x300x10x15
19
320
Gusset plat t = 10 mm
°
1°
.8
76
WF 300x300x10x15 600
99
.8
Girder WF 300x300x10x15 3°
7°
.1
80
K-26.1
K-26.3
Stiffner plat 9 - 2641 mm
Girder WF 300x300x10x15
Stiffner plat 9 - 2641 mm
Bolt M16 mm
Girder WF 300x300x10x15
Welded
Gusset plat t = 10 mm Bolt M16 mm
7036 WF beam 250x125x6x9 Welded
4723
Gusset plat t = 10 mm
1550
WF beam 250x125x6x9
2007 6680
4177
600
600
320
600 600
1 .4
320
Girder WF 300x300x10x15 Gusset plat t = 10 mm
9°
°
. 51
78
WF 300x300x10x15
98
600
7°
.3
.6
3°
K-26.2 Girder WF 300x300x10x15 81
K-26.4
8 Pcs. M 22mm Machine Anchor Bolt 8 Pcs. M 22mm Machine Anchor Bolt
2330 Elv +6.305 2330
320
320
948
Gusset plat t = 10 mm Gusset plat t = 10 mm
83 °
.1 Plat t = 15 mm, Welded to WF Steel Beam Plat t = 15 mm, Welded to WF Steel Beam 10 600
0°
600
96
0° .
83
.9
.9
Elv +5.420 Elv +5.420
96
0.50
0.50
0°
Girder WF 300x300x10x15 Girder WF 300x300x10x15
Elv +4.721 Elv +4.721
1.60
1.60
Main Reinforcement 12D16mm Ø12-200 mm Ø12-200 mm Main Reinforcement 12D16mm
2.00
2.00
Stirrup Ø10mm 200mm D16-200 mm D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +3.400 Elv +3.400
0.10
0.10
0.80 0.60 1.10 1.10 0.60 0.80
0.05
0.05
2.50 Lean Concrete T=100mm Lean Concrete T=100mm 2.50
2.70 Sandbed T=50mm Sandbed T=50mm 2.70
K26 K26
1356
1256
650
650
94
°
61
.3
5. °
90
12
9°
8 .
.8
89
8°
K-26.5 K-26.7
1300
1200 650
650
°
92
70
.3
90
87
0°
°0
.0
.0
0°
90
K-26.6 K-26.8
WF beam 250x125x6x9
Stiffner plat 9 - 2641 mm
0.50
650 1150
0°
.0
1.60
90
Main Reinforcement 12D16mm Ø12-200 mm
2.00
Stirrup Ø10mm 200mm D16-200 mm
Pedestal Column 300x600mm
0.40
Elv +3.400
0.10
0.80 0.60 1.10
0.05
2.50 Lean Concrete T=100mm
2.70 Sandbed T=50mm
K-26.9
WF beam 250x125x6x9
Stiffner plat 9 - 2641 mm
0.50
1150 650
90
.0
1.60
0
Main Reinforcement 12D16mm
°
Ø12-200 mm
2.00
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +3.400
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50
Sandbed T=50mm 2.70
K-26.9
0.50
92
Elv +3.804
.2
0°
0°
1.40
.8
87
1.80
Main Reinforcement 12D16mm
Ø12-200 mm
Stirrup Ø10mm 200mm
D16-200 mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
0.55 0.40 0.55
0.05
1.50 Lean Concrete T=100mm
1.70 Sandbed T=50mm
K27
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13 GI WF beam 200x100x5.5x8
Bolt M16 mm Girder WF 400x200x8x13
6094 Bolt M16 mm
3241
6142
2853 3276
2866
0°
93
.2
.8
86
0°
98
0°
.1
0°
.9
81
K-28.1
K-28.3
GI WF beam 200x100x5.5x8
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
Bolt M16 mm Girder WF 400x200x8x13
Bolt M16 mm
6105
3260
3291 6206
2845
2915
95
.8
0°
0°
.2
10
84 0°
0.
.4
60
79
°
K-28.2 K-28.4
Elv +4.879
Elv +4.808
10
Elv +4.308
3.
30
0°
°
Elv +4.020 .7
76
0.50
Elv +3.748
1.40
1.80
Main Reinforcement 12D16mm
Ø12-200 mm
Stirrup Ø10mm 200mm
D16-200 mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
0.55 0.40 0.55
0.05
1.50 Lean Concrete T=100mm
1.70 Sandbed T=50mm
K28
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13 GI WF beam 200x100x5.5x8
Bolt M16 mm
3401 Girder WF 400x200x8x13
6419 358
1.35
1 Bolt M16 mm
673
7
3018
10
315
6.
6
00
°
00
°
.
74
11
1.35
1.4
0°
°
.60
68
K-29.1
K-29.3
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13 GI WF beam 200x100x5.5x8
349 Bolt M16 mm
2
366
Girder WF 400x200x8x13
656 9
6
Bolt M16 mm
693
1
307
4
10
8.7
326
2
0°
°
.30
11
71
3.9
0
°
°
.10
66
K-29.2
K-29.4
1.5
5 714
4 2 Pcs. 10mm GI Plate Wing
Elv +4.020 8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate
Elv +4.020
Welded to WF Steel Column
Elv +4.020 321
6
Elv +4.020
0.15
0.15
Elv +4.020
0.50
Elv +3.700
1.40
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50
Sandbed T=50mm 2.70
K29
34
67
11
12
36
80
8.5
2.4
5°
6°
.4 5° °
61 .54
57
K-30.1 K-30.3
GI WF beam 200x100x5.5x8
40
46
Girder WF 400x200x8x13
76
10 Bolt M16 mm
42
82 GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
80
Bolt M16 mm
35
12
64 95
0.6
1°
°
.39
59
12
K-30.2
4.1
38
13
1°
°
.89
55
K-30.4
83
31
Welded
Elv +6.930
Gusset plat t = 10 mm
Elv +6.520
Elv +6.374 Gusset plat t = 10 mm WF 400x200x8x13
Elv +5.874 Girder WF 300x300x10x15
37
Bolt M16 mm 62
0.15
Welded to WF Steel Column
0.15
Elv +4.020
0.50
Elv +3.700
1.40
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50
Sandbed T=50mm 2.70
K30
45 47
40 84
GI WF beam 200x100x5.5x8 GI WF beam 200x100x5.5x8
85
59
Girder WF 400x200x8x13 Girder WF 400x200x8x13
Bolt M16 mm 89 Bolt M16 mm
62
126
128
.80°
.70
40
19
°
41
78
°
.20 0°
53 51.3
K-31.1 K-31.3
46
79
GI WF beam 200x100x5.5x8 1.
90
48
47
40
129
°
92
.30
0°
°
52.1 42
81
0°
50.7
K-31.2
K-31.4
45 GI WF beam 250x125x6x9
33
1.
93
Girder WF 300x300x10x15
Bolt M16 mm
92
63 Welded
Elv +7.419
Gusset plat t = 10 mm
Elv +7.020
WF 400x200x8x13
129
Elv +6.859
.60
Elv +6.359
°
Gusset plat t = 10 mm
Girder WF 300x300x10x15 41
88
Bolt M16 mm 0°
50.4
0.15
Welded to WF Steel Column
0.15
Elv +4.020
0.50
Elv +3.700
1.40
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50
Sandbed T=50mm 2.70
K31
1.
95
49
40
2.
00
50
GI WF beam 200x100x5.5x8 66
129
43
44
.00
0°
°
50.3 43
80
0°
51.0
K-32.1 K-32.3
50
59
50
13
GI WF beam 200x100x5.5x8
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
Girder WF 400x200x8x13
94
27 Bolt M16 mm
94
25
Bolt M16 mm
129
128
.50
.30
°
43
°
68
44
0° 12
50.5 0°
51.7
K-32.2 K-32.4
Bolt M16 mm
93
68
Welded
Elv +7.320
Gusset plat t = 10 mm
Elv +6.923
Elv +6.770 WF 400x200x8x13
127
Elv +6.270
.32
Gusset plat t = 10 mm
°
42
Girder WF 300x300x10x15 60
0.15
Welded to WF Steel Column
0.15
Elv +4.020
0.50
Elv +3.703
1.40
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50
Sandbed T=50mm 2.70
K32
49
26
GI WF beam 200x100x5.5x8
92
71 Girder WF 400x200x8x13
1.8
Bolt M16 mm 8 48
03 GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
89
Bolt M16 mm
78
12
6.0
43
8°
45
2°
53.9
12
2.9
41
6°
7 5
.0 4°
57
K-33.1
K-33.3
1.9 48
0 92
GI WF beam 200x100x5.5x8 46
62 GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
Girder WF 400x200x8x13
Bolt M16 mm
91
40 87
Bolt M16 mm
89
12
4.6
12
42
1.1
2°
48 41
27
4°
°
.38 6°
55 .8
58
K-33.2 K-33.4
CONTRACTOR : WORK DRAWING TITLE DESIGN CONSULTANT DRAWING SHEET
PT. PENGEMBANGAN PARIWISATA INDONESIA PT. HUTAMA KARYA
(PERSERO) PT. ADHI KARYA, JO DRAWN BY CHECKED BY ACCEPTED BY
THEMANDALIKAURBANANDTOURISM CO TEAM LEADER TEAM LEADER
ITDC - PROJECT MANAGEMENT OFFICE DATE : PROJECT MANAGEMENT CONSULTANT DATE : CERTIFIED BY DATE : INFRASTRUCTUREPROJECT(MUTIP) Column and Beam Detail
DEPUTY PROJECT MANAGER DRAWING NUMBER
08/03/2022 08/03/2022 08/03/2022
LOCATION SCALE Hariadi S L.Rizal Nugroho Hadi Kumoro
STR.CB.37
LUTFI RACHMAN ROMEO D. ACEDILLA ARIEF INDRIYANTO LOMBOK 1:100 DATE : 08/03/2022 DATE : 08/03/2022 DATE : 08/03/2022
Stiffner plat 9 - 2641 mm
Elv +8.537
GI WF beam 250x125x6x9
Girder WF 300x300x10x15
41
74
1.8
3
Bolt M16 mm
85
76
Welded
11
Elv +5.592 Bolt M16 mm
9.1
39
22
8°
.8 2°
60
2 Pcs. 10mm GI Plate Wing
8 Pcs. M 22mm Machine Anchor Bolt
600x300mm x 20mm Thick GI Base Plate
0.15
Welded to WF Steel Column
0.15
Elv +4.020
0.50
Elv +3.745
Main Reinforcement 12D16mm
1.40
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm 2.50
Sandbed T=50mm 2.70
K33
GI WF beam 200x100x5.5x8
44
15 GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
83
40 Bolt M16 mm 418
7
Girder WF 400x200x8x13
Bolt M16 mm
781
2
39
11
25 362
7.1
5
0°
11
2.5
0 °
2.9
6
°
6
°
.44
67
K-34.1
K-34.3
GI WF beam 200x100x5.5x8
431
4 Girder WF 400x200x8x13 GI WF beam 200x100x5.5x8
Bolt M16 mm Girder WF 400x200x8x13
808
4 398
8
752
Bolt M16 mm
9
377
0
11
354
4.8
1
8 °
11
2
5.1
0.1
6
7°
°
.83
69
K-34.2
K-34.4
Girder WF 300x300x10x15
0.15
8 Pcs. M 22mm Machine Anchor Bolt
0.15
Elv +4.020
600x300mm x 20mm Thick GI Base Plate
0.50
Elv +3.792
Welded to WF Steel Column
Main Reinforcement 12D16mm
Ø12-200 mm
1.80
D16-200 mm Stirrup Ø10mm 200mm
Pedestal Column 300x600mm
0.40
Elv +2.200
0.10
1.10 0.60 0.80
0.05
Lean Concrete T=100mm
2.50
Sandbed T=50mm
2.70
K34
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
3667 Bolt M16 mm GI WF beam 200x100x5.5x8
6945
Girder WF 400x200x8x13
Bolt M16 mm
3278 3393 6347
10
2954
5.
29
1 °
°
.7
74
10
0.
0°
40
.6
79
K-35.1
°
K-35.3 GI WF beam 200x100x5.5x8
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
Girder WF 400x200x8x13
Bolt M16 mm
Bolt M16 mm
3553 6647 3194 6049
2855
3094
98
3°
.0
10
.9
7°
81
2
°
.3
2
.6
8°
77
K-35.2 K-35.4
0.15
1.33
0.15
Elv +4.020 Elv +4.020
0.50
0.50
1.08
Elv +3.840 Elv +3.891
2°
1.40
1.40
95
.1
.8
84
8°
1.80
1.80
Main Reinforcement 12D16mm Main Reinforcement 12D16mm
Ø12-200 mm Ø12-200 mm
Stirrup Ø10mm 200mm Stirrup Ø10mm 200mm
D16-200 mm D16-200 mm
Pedestal Column 300x600mm Pedestal Column 300x600mm
0.40
0.40
Elv +2.200 Elv +2.200
0.10
0.10
0.55 0.40 0.55 0.55 0.40 0.55
0.05
0.05
1.50 Lean Concrete T=100mm 1.50 Lean Concrete T=100mm
1.70 Sandbed T=50mm 1.70 Sandbed T=50mm
K35 K36
GI WF beam 200x100x5.5x8
GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13
Girder WF 400x200x8x13
Bolt M16 mm
Bolt M16 mm
4874
5461
2473 2401
2834
2627
9°
90
.0
.9
89
1°
0°
93
.1
.9
86
0°
K-35.5 K-35.7
GI WF beam 200x100x5.5x8 GI WF beam 200x100x5.5x8
Girder WF 400x200x8x13 Girder WF 400x200x8x13
Bolt M16 mm Bolt M16 mm
5168
4581
2665
2503 2253 2328
9°
92
.7
90
0°
.2
87
.0
.0
1°
90
0°
K-35.6 K-35.8