Académique Documents
Professionnel Documents
Culture Documents
3.1 3.1
6.9 0.4 15.3 8.4 13.5 4.7 4.4 8.9 1.5 6.8 2.7
0.2 0.2 0.2 0.1
0.4
3.5 4.1
3.7 3.7
6.0 5.4
0.3 4.0
0.5 0.5
16.0
29.5
0.3
12.7 0.3 50.1
0.5 0.4
2.3
43.5
7.2
1.7
0.2
0.2 0.5 0.5 0.5
1.0
4.7 4.4 0.2
3.2 2.3 3.6 2.3
2.5
0.2
0.6 0.6 0.6 0.6 0.6
0.5 0.7 0.6 3.5 5.4 1.6 1.4 4.1 4.0 1.0 2.3 0.8 2.1 2.1 4.0 0.8 2.3 1.0 0.6 4.1 1.1 1.6 0.8 4.4
0.7
0.50.2 0.4
3.8
1.4 1.4
1.5 1.1
0.3
2.9 0.3 2.3 0.6 1.6 1.4
8.3 7.8 7.5
5.8
3.7
1.1
0.4
4.8 8.0 15.9
6.2
0.4 0.4
10.9 0.2 6.6 1.90.4 11.1 16.0 16.2 0.4 8.0
3.1
1.6 5.0 1.9
74.9
Légende
Maconnerie de 100mm plan de repérage de la maconnerie
Maconnerie de 200mm
Niveau SS2 B(AS01)
phase PROJET UM6P RABAT-PISCINE Lot Pl Batiment Niveau Indice ECHELLE
Entreprise:
EXE Plan de repérage maçonnerie MAC AS01 -11.50 1/15