Académique Documents
Professionnel Documents
Culture Documents
0
0 Freq Strip 22 strip
2394 gr 155 Average Loaded 2582 oz/strip
2317 gr 159 Gold Produced 1826 oz
2534 gr 163 Gold Recovered 1806 oz
2880 gr 185 Delta GIC -20 oz
3216 gr 209
65
77 19 11 42%
77
2408 gr 168
2408 gr 168
2408 gr 168
2408 gr 2007 gr 232
0
Parameter
Gold Recovered 6000 Oz/month
194 Oz/Day
0.001 0.002 0.003 0.004
Tanggal G Rec (oz) GIC V1 V2 V3 V4 V5
3-Oct 193.55 355 1628 1590 1419 1112 943
4-Oct 193.55 516 2129 2092 1920 1613 1445
5-Oct 193.55 542 502 502 2422 2115 1946
6-Oct 193.55 557 Au in 1003 1003 502 502 2448
7-Oct 193.55 562 Resin 1505 1505 1003 1003 502
8-Oct 193.55 445 2007 2007 1505 1505 1003
9-Oct 193.55 371 502 502 2007 2007 1505
10-Oct 193.55 355 1003 1003 502 502 2007
11-Oct 355 1505 1505 1003 1003 502
0.005 0.006 0.007 0.008 0.009
V6 V7 V8 V9 V10 Str 1 Str 2 Str 3 Au in LR1
927 873 872 871 806
1429 1375 1373 1373 1308 #1 #1 2129 gr
1931 1876 1875 1874 1810 #1 #1 2422 gr
2432 2378 2377 2376 2311 #1 #1 2448 gr
502 2880 2878 2878 2813 #1 #1 #1 2880 gr
1003 502 502 502 3315 #1 #1 #1 3315 gr
1505 1003 1003 1003 502 #1 #1 #1 2007 gr
502 1505 1505 1505 1003 #1 #1 #1 2007 gr
1003 2007 502 502 1505 #1 2007 gr
Au in LR2 Au in LR3
0 Freq Strip 19 strip
2092 gr 136 Average Loaded 2218 oz/strip
2115 gr 146 Gold Produced 1355 oz
2432 gr 157 Gold Recovered 1355 oz
2878 gr 2878 gr 278 Delta GIC 0 oz
2007 gr 2007 gr 236
2007 gr 1505 gr 177
1505 gr 1505 gr 161
65
Parameter
Gold Recovered 6000 Oz/month
194 Oz/Day
0
0 Freq Strip 23 strip
3396 gr 3225 gr 323 Average Loaded 3673 oz/strip
3351 gr 3335 gr 328 Gold Produced 2716 oz
3882 gr 3881 gr 374 Gold Recovered 2710 oz
142 Delta GIC -7 oz
0
97
116 19 12 39%
3612 gr 252
4214 gr 271
4214 gr 4214 gr 406
3010 gr 232
2408 gr 174
0
Skenario 1
129 oz/day
Gold Produced 4,000 oz/month
48,000 oz/year
Berat Kemasan
Thiourea kg/bag 25
Acid kg/drum 250
Price
Thiourea $/ton 3,573
Acid $/ton 247
Skenario 2
194 oz/day
Gold Produced 6,000 oz/month
72,000 oz/year
(8) -39%
1,455 66%
(0.76) -31%
(1.16) -40%
(55) -31%
(83) -40%
(195,623) -31%
(20,581) -40%
(216,204) -32%
Skenario 1
129 oz/day
Gold Produced 4,000 oz/month
48,000 oz/year
Baseline
Parameter Unit
Shipment / Minggu
Electricity Price
LWBP 1,091 IDR/kwh
WBP 1,608 IDR/kwh
1,156 IDR/kwh
Total
0.08 USD/kwh
Kurs 15000 IDR/USD
11 (8) -42%
14,926 (10,855) -42%
416 (416) -50%
15,342 (11,271) -42%
Stripping Duration: 6 hr
2.00 12 0.92
2.00 12 0.92
2.00 12 0.92
2.00 12 0.92
26.02
KW Power (kwH) Cost(USD)
-39%
-39%
-50%
-40%
Skenario 1
129 oz/day
Gold Produced 4,000 oz/month
48,000 oz/year
Baseline
Parameter Unit
Shipment / Week
Parameter
Bullion Wgt / Pouring 15 kg
Fuel Consumption 25 L/Pouring
Fuel Price 1.07 $/L
Skenario 2
Gold Produced
Improvement Variance
Parameter
Shipment / 2 Week Amount %
kg 47 93 47 100%
times/year 208 182 (26) -13%
$/year 5,541 4,848 (693) -12%
$/year 5,541 4,848 (693) -12%
Skenario 1
129 oz/day
Gold Produced 4,000 oz/month
48,000 oz/year
Baseline
Parameter Unit
Shipment / Minggu
Gold Produced
Improvement Variance
Parameter
Shipment / 2 Minggu Amount %
Cost
32,598
32,598
6,396
6,396
3,198
22,295
4,221
4,221
4,221
22,295
4,221
4,221
4,221
151,102
10.07 15000 IDR/USD
194 oz/day
6,000 oz/month
72,000 oz/year
To Singapore
Saving Component
Invoice
Saving Component
Weekly of Bi-Weekly of
Selisih Cost ($) per Oz Total Cost ($) Montly ($)
the Year ($) the Year ($)
Weekly of Bi-Weekly of
Total Price ($) Montly ($)
the Year ($) the Year ($)
Weekly of Bi-Weekly of
Total Price ($) Montly ($)
the Year ($) the Year ($)
213,200 106,600
213,200 106,600
1,018
Simulasi 4x Shipment
Description UoM Sim 4KOZ Sim 6KOz Description UoM
Gold Produced Oz 4,000.00 6,000.00 Gold Produced Oz
Simulasi 4x Shipment : Simulasi 2x Shipment :
Per Shipment Oz 1,000.00 1,500.00 Per Shipment Oz
Weekly Kilogram Kg 31.10 46.66 Weekly Kilogram Kg
Refining per Kilo Kg 124.41 186.62 Refining per Kilo Kg
Minimum Charge (50 kg) Oz 1,608 1,608 Minimum Charge (50 kg) Oz
Cost : Cost :
Refining $ 5,823 8,734 Refining $
Shipping (Brinks) $ 13,505 13,505 Shipping (Brinks) $
Bullion Superintending $ 6,667 6,667 Bullion Superintending $
Akomodasi Penginapan $ 346.67 346.67 Akomodasi Penginapan $
Total Cost 4x Shipment $ 26,341 29,252 Total Cost 2x Shipment $
Simulasi 2x Shipment Variance Variance Yearly Yearly
Sim 4KOz Sim 6KOz 4KOz 6KOz 4KOz 6KOz
4,000.00 6,000.00
2,000.00 3,000.00
62.21 93.31
124.41 186.62
- -
5,823 8,734 - - - -
8,944 9,726 4,562 3,779 54,739 45,353
3,333 3,333 3,333 3,333 40,000 40,000
173.33 173.33 173 173 2,080 2,080
18,273 21,966 8,068 7,286 96,819 87,433
SUMMARY
Prediksi Penghematan per tahun
Reagent
1 599,883 408,501
(Thiourea & Acid)
Electric
2 26,613 15,342
(Stripping, Kalsinasi, Electrowinning Process)
- 0% 104,806 104,806 - 0%