PDC
NUMBER
DESIGN
PRESSURE
DESIGN
TEMP.
MAX OPER.
PRESSURE
MAX OPER.
TEMP.
PIPE
CLASS
PDT INSUL-
ATION
FIELD TEST
PRESSURE
MATERIAL REMARKS
NOTES:
bar(g) (DEG.C) bar(g) (DEG. C) TYPE bar(g)
2''
AIR INSTRUMENT 1. POUR INDEX, LEGENDES & SYMBOLES, VOIR PLAN ADR-MHG-100-000.
EKG-1 77.00 50.0 70.00 49.4 D ADR 0605 N 115.50 ASTM A 106 GRADE B
2. FGCSV=FUEL GAS CONDITIONING SKID VENDOR
EKG-2 77.00 100.0 70.00 93.0 D ADR 0605 A 115.50 ASTM A 106 GRADE B
PWPS=PW POWER SYSTEMS
L EKG-3 45.50 150.0 34.50 115.6 D ADR 0640 A 68.25 ASTM A 312 TP 304L 3. AU POINT D'EXTRIMITE BRIDEE D'ENTREE DU SKID DU GAZ CONDITIONNE, COTRE BRIDE ,JOINT L
D'ETANCHIETE DIELECTRIC, AVEC LES FIXATIONS NECESSAIRES DOIVENT ETRE FOURNI PAR FGCSV.

4. AU POINT DE LA SORTIE TERMINAL DE L'EQUIPEMENT DE SKID LA TG EXISTANTE DE GAZ, CONTRE


BRIDE ,JOINT D'ISOLATION ,HYENCO FOURNIRA TOUS LES FIXATIONS NECESSAIRES.
XV
5. LA CONNECTION DE BLOWOUT EXISTANTES DANS LA BRIDE D'ISOLATION SITUEE JUST A L'ASPIRATION
DCS
DU SKID DE FILTRAGE DE LA TG DU GAZ .LE BLOWOUT EST EFFECTUÉ EN REMPLACANT LA PIÈCE DE
SPOOL SITUÉE ENTRE CETTE BRIDE D'ISOLATION ET LA BRIDE D'ENTRÉE DE SKID DE FILTRAGE DE LA
TG EXISTANTE AVEC TUYAUTERIE ET SOUPAPES DE BLOCAGE TEMPORAIRES.LA LONGUEUR DE
SPOOL D'ASPIRATION POUR CHAQUE SKID DE FILTRAGE DE TG DE GAZ EXISTANT DOIT ETRE AU 600MM
PIAZ AU MINIMUM.
K TIA 6. UNE CONNEXION DE SOUFFLAGE EXISTE A LA FIN DE COLLECTEUR DU GAZ. K
7. LA PEINTURE ET LE REVÊTEMENT SONT EFFECTUÉS CONFORMÉMENT AU DOC. N°. ADR-MHM-100-011
(SPECIFICATION DE PEINTURE).
8. LES CONDITIONS D'ALIMENTATION DANS LA STATION DU GAZ EXISTANTE DOIVENT SUIVRE :
PI PT PT PT PRESSION MIN. = 32 BAR (G)
TT TI PRESSION MAX. = 70 BAR (G)
ZSO ZSC
TEMPERATURE MIN. COMME DANS LE CONTRAT = 5°C
9. LE BY-PASS SERA INSTALLE POUR LA PREMIERE PHASE D'OPERATION.

00EKG01-AA403
TW TW 10. LES DETAILS DES EQUIPEMENTS SERONT MONTRE APRES LA SELECTION DES VENDEURS.
HYENCO ETTERKIB
11. AFIN D'ASSURER LE DEMONTAGE DE BY-PASS, LA VANNE Ø8' SERA MONTE DIRECTEMENT APRES
EKG-1 XV
UNE BRIDE WELD-NECK.
J 12. LA VANNE ET LE BY-PASS Ø1" SERONS INSTALLE APRES ETRE DEPLACER DE STATION DE GAZ J
DE LA STATION GAZ 00EKG01-BR00-0605-10 N.B :LA VANNE À BOISSEAU SPHERIQUE MANUELLE Ø8" AVEC VANNE D'ÉGALISATION Ø1" NE SERONS
NOTE-8 PAS FOURNI PAR LE VENDEUR, C'EST-À-DIRE . QUE LES VANNES DEVRAIENT ÊTRE DÉCOPÉRÉES DANS
Ø1" LA PORTÉE D'APPROVISIONNEMENT DU VENDEUR.
00EKG01-BR401-0605-2 00EKG01-AA401 NOTE-12

00EKG01-AA404

00EKG01-AA405
PDISA
00EKG01-AA402 PDIA
10''
DRAIN PI PI PI
PDSH

I I
PDIA
PI
PDIT
PSV
PDIT REFERENCE DES PLANS:
DESSIN NO. TITRE DE DESSIN
LISA ADR-MHG-100-000 P&ID FOR INDEX, LEGENDS & SYMBOLS
LI LT
PI
HYE-PM-01-2018 PROJECT PROCEDURE & NUMBER SYSTEM
LISA
H ADR-MHM-100-001 DESIGN CRITERIA DOCUMENT H

ADR-MHM-100-400 PLOT PLAN


LT
XV SM-MF-110 PWPS EXISTING GT FUEL GAS EQUIPMENT P&ID
LISA LI LISA
LT SV-MS-MF-110 PWPS EXISTING GT FUEL GAS EQUIPMENT P&ID
FQI
1302-181-M202D PWPS GT OEM P&ID

TI PI

FQIT

XV XV
G G

PDIA

PDISA LISTE DE RESERVES:


PI PI

DEBIMETRE TURBINE
PI
PDSH

F F
PDIA PDIT
PI

1'' ADR-MHM-644-002-04 PSV


H-7
PDIT
DU SYSTEME EAU DEMINERALISEE LI
LISA
LT

LISA

LT
E XV E

TI LISA LISA
LT LT
MANDATAIRE DESIGNE PAR LE MAITRE D’OUVRAGE : COMPAGNIE DE L’ENGINEERING DE
L’ELECTRICITE ET DU GAZ «CEEG.SPA»
DIRECTION DE L'ENGINEERING DES MOYENS DE PRODUCTION
PI IMMEUBLE 700 BUREAUX RN N° 38 GUE DE CONSTANTINE KOUBA ALGER
TEL: 021 83 84 00 - FAX: 021 83 90 17

D XV XV SEPARATEUR D'EAU VERTICAUX CENTRALE ELECTRIQUE EN TURBINE A GAZ D

2 X 100% MOBILE D’ADRAR 08X20 MW


N° Contrat : Statut de Distribution : Numérotation Maitre d’Ouvrage :
2017/135/KDM-68/SPE/2017 POUR APPROBATION ADR-EM-400-002
Espace réservéaux tampons (Revue et validation du document - si nécessaire) :

SEPARATEUR D'EAU HORIZENTAUX Historique des Révisions :


07 PA POUR APPROBATION TATA YEKHLEF IBOUZIDENE 08-AOU-2021
2 X 100% 06 PA POUR APPROBATION KALOUACHE TATA YEKHLEF IBOUZIDENE 04-JUL-2021
C 05 PA POUR APPROBATION KALOUACHE TATA YEKHLEF IBOUZIDENE 29-AVR-2021 C

04 PA POUR APPROBATION KALOUACHE TATA YEKHLEF IBOUZIDENE 22-AVR-2021


03 PA POUR APPROBATION PS PVP MYV SUB 10-JAN-2020
02 PA POUR APPROBATION PS PVP MYV SUB 13-NOV-2019

PURGE
EVENT
01 PA POUR APPROBATION PS MYV MYV SUB 03-AOU-2019
TI 00 PA POUR APPROBATION PS MYV MYV SUB 04-MAI-2019

Rév. St. Description de la révision concepteur Contrôlé Vérifié Approuvé Date


Titre :
B
PI SCHEMA P&ID B

SYSTEME GAZ
N°Projet Emetteur Emetteur Teamcenter Numérotation du Constructeur
LISA LISA
LI LT LT
--- --- --- ADR-MHM-400-002
Nom et logo Numérotation du Fournisseur L&T
Fournisseur L & T - SARGENT & LUNDY
DRAIN
L&T LIMITED N.A
VERS EQUIPEMENT TG EXISTANT
Type doc Classe Confidentielle Dérivéde Echelle Format Feuille De Suit F.
A A
ADR-MHM-400-002-01 --- --- --- NONE A1 01 02 02
K-2

A1 (841mm x 594mm)
RESERVOIR DE COLLECTE DE CONDENSAT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16