Académique Documents
Professionnel Documents
Culture Documents
1 2 3 4 CALLE
GUAD
ALUPE
LAZAR
O
CONDUCTOR DE PUESTA
Z
LOPE
A TIERRA COLOR VERDE
INTO
CONDUCTOR NEUTRO
JAC
CALL
COLOR BLANCO E GU
CALLE
ADAL
UPE
LAZA
RO
CAJA METALICA
DE PASO 4x4
CALL
E AU
E
GU
END
STO
HDZ
OLIVE
O ALL
IGNACI
5.85 CAJA O CHALUPA
INO
CALLE
LINO MER
CALLE CALL
E AU
NDE
GUAD GU
ALUPE STO
BOSA HDZ
3.70 2.15
ALLE
DA
CONEXION ATIERRA OLIV
Z
E
LOPE
CIO
INTO
IGNA
TUBERIA POLIFLEX
JAC
CALLE
CALLE
CONDUCTOR DE FASE
COLOR ROJO
TAPA
A 2H#14
∅19mm
2H#14
∅19mm
2H#12
N.P.T.=0.05
ACOMETIDA ELÉCTRICA
TABLERO DE FUERZA
INTERRUPTOR GENERAL
J
C-1 C-2 C-3 C-4 C-5 C-6 M MEDIDOR ELÉCTRICO
1660W 1020W 1360W 750W 750W 1940W
∅19mm
SALIDA FLUORESCENTE DE CENTRO
C
2H#14 2H#14
2H#12
∅19mm SALIDA FLUORESCENTE ARBOTANTE
K
J
B BOMBA
3.75 3.75
∅19mm CAJA DE REGISTRO
3H#14 N.P.T.=0.20
J 2H#12 ∅19mm
CONTACTO
J
3H#14
2H#12 TUBERIA POR LOSAS
B 2H#14
2H#14
2H#12 A
N.P.T.=0.10
∅19mm
2H#14
H
∅19mm
H
∅19mm
2H#12
I
1.35 2H#12 N.P.T.=0.20
1.35
TABLERO DE DISTRIBUCIÓN
∅19mm
12.50
E
∅19mm G
3H#14
G
∅19mm
2.10 12.35
2H#12 2H#12
C
2H#12
2H#12
N.P.T.=0.20
INTERRUPTOR
3H#14
∅19mm
2H#12
3.75 GENERAL
D E
∅19mm
2H#12
G ∅19mm
∅19mm
1 X 50 A
∅19mm 3H#14
F ∅19mm
3H#14 2H#12
2H#12 F
E ∅19mm
2H#12
∅19mm
2H#14
2H#12
E 2H#12 ∅19mm
1.05
F 5.15
M
B 2H#14 ∅19mm B
D 2H#12
2H#14
MEDIDOR
2H#12 2H#14
∅19mm ∅19mm
2H#12
∅19mm N.P.T.=0.10 ∅19mm
N.P.T.=0.20 2H#14
C 2H#14 ∅19mm 2H#12 ∅19mm
D
2H#12
2.45 C 2H#14
2H#12
B B
B ∅19mm
∅19mm
N.P.T.=0.10 A PLANO:
2H#14
2H#14
2H#12
∅19mm
2H#14
2H#12
∅19mm
PLANO ARQUITECTONICO
G A
N.P.T.=0.10
A
∅19mm
2H#14
A
2H#14
∅19mm A
PROYECTO: COSMON
INFRAESTRUCTURA
CASA-HABITACION MODELO "INGENIERIA DE VANGUARDIA"
∅25mm SONARI-2023
ACOMETIDA C.F.E PROPIETARIO:
C. SONIA SANCHEZ PEREZ
1.35 1.16 3.35 Cuadro de Cargas UBICACIÓN:
∅25mm CALLE IGNACIO ALLENDE S/N VILLA CHICHICAPA,
MUNICIPIO DE COMALCALCO, TABASCO.
M B
6.00 CIRCUITOS Espacios TOTAL
600W 180W 180W 60W 50W 50W 75W 200W 750W 20W PROYECTÓ:
SUPERFICIE DEL LOTE P.BAJA
SUPERFICIE DE CONSTRUCCION
P. ALTA P. AZOTEA
TOTAL DE
CONSTRUCCIÓN
ING. SERGIO ENRIQUE SOTO APARICIO
C-1 Sala, Baño1, Frente 6 8 1 1,555W CED. PROF.: 11188459 166.85 M2 59.00 M2 0.00 M2 0.00 M2 59.00 M2
003-INSTALACIONES
C-4
C-5
Bomba
Climas.
1
1
600W
750W
INS-003 ING. SABINO MORALES VELAZQUEZ
DIRECTOR RESPONSABLE DE OBRA
No. de DRO: 1020
N/P
CORRESPONSABLE DE DISEÑO ARQUITECTONICO
NO. de CDA: XXX-X
N/P
CORRESPONSABLE DE INSTALACIONES
NO. de CDI: XXX-X