T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
S O M M A I R E
Chapitre page
1 INSTALLATIONS DE CHANTIER 2
2 DEMOLITIONS 4
3 TERRASSEMENTS 4
4 FONDATIONS 5
5 CANALISATIONS 5
6 INFRASTRUCTURE 6
7 SUPERSTRUCTURE 8
8 OUVRAGES EN TERRASSES 10
9 PREFABRICATION 11
10 ARMATURES 12
11 RAGREAGES 13
12 PARACHEVEMENTS 14
13 MACONNERIES 15
14 REVETEMENTS 16
15 FINITIONS 16
16 REPLIEMENT DE CHANTIER 17
Page 1
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 1
- INSTALLATION DE CHANTIER -
Page 2
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 1
- INSTALLATION DE CHANTIER -
Page 3
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 2
- DEMOLITIONS -
MACONNERIE m3 7,50
CHAPITRE 3
- TERRASSEMENTS -
Page 4
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 4
- FONDATIONS -
Page 5
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 5
- CANALISATIONS -
DESIGNATION PARTICULARITE UNITE T.U.
POSE DE TUYAUX ml 1,10
POSE DE DRAINS PVC ml 1,30
POSE DE SIPHONS U 2,00
EXECUTION DE REGARD Exécution traditionnelle, maçonnée U 15,00
Préfabriqué U 4,00
EXECUTION DE CANIVEAU Exécution traditionnelle ml 5,30
Préfabriqué ml 3,30
CHAPITRE 6
- INFRASTRUCTURE -
Page 6
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
VOILE EN TRANCHEE BLINDEE Coffrage tradi (min. : 2,50h – max. 6h) m² 3,50
Bétonnage (min. : 3h – max. 6h) m3 4,50
Aciers coupés-façonnés kg 0,15
POTEAU EN PUITS BLINDE Coffrage m² 4,00
Bétonnage (min. : 4h – max. 8h) m3 6,00
Aciers coupés-façonnés-assemblés kg 0,13
PAROI MOULEE Démolition des murettes guides ml² 4,00
Recépage paroi (sur 70 cm de haut) m3 13,00
Nettoyage et dressement paroi m² 1,00
Dégagement aciers en attente ml 0,20
VOILE EN SOUS-OEUVRE Coffrage m² 4,00
3
Bétonnage (min. : 2,50h – max. 4h) m 3,25
Aciers coupés-façonnés kg 0,15
3
PIEUX Recèpage tête de pieu m 13,00
Coffrage massif tête de pieu m² 1,50
Béton pour massif m3 2,00
Aciers CFA kg 0,13
POSE DE POLYSTYRENE JOINT DILAT. m² 0,10
REVETEMENT BITUMINEUX m² 0,15
ENDUIT TRADI SUR MITOYEN Compris piochage du support m² 2,50
POSE DE JOINT WATER-STOP ml 0,50
COFFRAGE DE DALLE PLEINE EN INFRA. Coffrage bois traditionnel m² 1,20
Table coffrante m² 0,50
Poutrelles type « Doka » m² 0,70
Avec sapines grande hauteur m² 1,50
Coffrage modulaire hauteur normale m² 0,60
Coffrage modulaire grande hauteur m² 1,00
BETON POUR DALLE PLEINE m3 1,20
POSE DE PREDALLES Compris étaiement m² 0,45
POSE DE PLANCHER CORPS CREUX Pose, compris étaiement m² 1,15
Pose de treillis soudé m² 0.08
3
Béton complémentaire, cis surfaçage m 2,50
POSE DE PLANCHER CORPS CREUX Pose, ferraillage, bétonnage tout compris m² 1,30
Page 7
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 7
- SUPERSTRUCTURE -
Page 8
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
Page 9
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 8
- OUVRAGES EN TERRASSES -
Page 10
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 9
- PREFABRICATION -
Page 11
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 10
- ARMATURES -
Diamètre moyen φ6 φ8 φ 10 φ 12 φ 14 φ 16
Coupe 10 10 7 6 5 4,5
Façonnage 10 10 7 6 5 4,5
Assemblage 36 30 25 21 19 17
Pose 36 30 25 21 19 17
Total (h/tonne) 92 80 64 54 50 43
Page 12
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 11
- RAGREAGES -
Page 13
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 12
- PARACHEVEMENTS -
Page 14
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 13
- MACONNERIES -
Page 15
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 14
- REVETEMENTS -
CHAPITRE 15
- FINITIONS -
Page 16
T E M P S U N I T A I R E S D E M A I N D ’ O E U V R E
CHAPITRE 16
- REPLIEMENT DE CHANTIER -
Page 17