PROJECT TITLE projet Handling & storage JPH2 P/L Issue Date Location/Area convyeur SE2
22/09/2023
Alignement de groupe de
4 M Convoyeur SE2 11/9/2023 B Menasteel
commande à verifier
Notes :
Contractor CONSTRUCTION Contractor QA / QC JESA CONSTRUCTION JESA COMMISSIONING CUSTOMER
NAME NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE SIGNATURE
DATE DATE DATE DATE DATE
CATEGORY :
‘A’ : A defect or omission that is a high risk item that poses a significant threat to the health and safety of persons and/or risk of damage to the equipment and it may be necessary that work should cease to avoid possible harm to persons and/or equipment., A component/subsystem/system will not be energized until all Category ‘A’ items are corrected.
'B': A defect or omission that will not impact on the performance of the next stage of commissioning or, not affect the commissioning schedule or, not have an impact on functionality., The items must be rectified before contractors, subcontractors or suppliers can obtain sign off for their work.
'C': A defect, or omission that is not safety, integrity or operationally critical to the facility, process, environment or people. , items are low risk items that can be rectified at any stage up to the Completions Stage 4 (Start Up and Ramp Up) sign off. Contractors, subcontractors or suppliers will not be released from their obligations until all items are rectified.
"D" : These are issues or items that are desirable to Operations or are outside the project work scope agreement.
DISCIPLINE - A : Architectural, C : Civil, S : Structural, E : Electrical, H : HVAC, I : Instrumentation, IN : Insulation, M : Mechanical, PA : Painting, P : Piping, FF : Fire Fighting
WALKDOWN STATUS - CW : Construction Walkdown HOW : Handover Walkdown MCW : Mechanical Completion Walkdown.