Vous êtes sur la page 1sur 384

HARGA SATUAN DASAR UPAH KABUPATEN BANYUWANGI TA.

2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 78,120 96,000 78,331.37 96,259.74 78,439.35 96,392.45 78,441.54 96,395.13 78,337.93 96,267.81 78,226.04 96,130.30 78,209.10 96,109.49 78,300.91 96,222.32 78,414.79 96,362.26
2 Tukang OH 98,280 108,000 98,545.91 108,292.21 98,681.77 108,441.50 98,684.51 108,444.52 98,554.18 108,301.29 98,413.40 108,146.59 98,392.10 108,123.18 98,507.60 108,250.11 98,650.86 108,407.54
3 Mandor OH 110,880 124,000 111,180.00 124,335.50 111,333.27 124,506.91 111,336.37 124,510.37 111,189.33 124,345.93 111,030.50 124,168.31 111,006.47 124,141.43 111,136.78 124,287.16 111,298.41 124,467.92
4 Operator OH 200,000 255,000 200,541.13 255,689.94 200,817.59 256,042.43 200,823.18 256,049.56 200,557.95 255,711.38 200,271.47 255,346.12 200,228.11 255,290.85 200,463.17 255,590.54 200,754.71 255,962.25
5 Pembantu Operator OH 120,000 160,000 120,324.68 160,432.90 120,490.56 160,654.08 120,493.91 160,658.55 120,334.77 160,446.36 120,162.88 160,217.17 120,136.87 160,182.49 120,277.90 160,370.53 120,452.83 160,603.77
6 Sopir OH 96,000 120,000 96,259.74 120,324.68 96,392.45 120,490.56 96,395.13 120,493.91 96,267.81 120,334.77 96,130.30 120,162.88 96,109.49 120,136.87 96,222.32 120,277.90 96,362.26 120,452.83
7 Pembantu Sopir OH 80,000 104,000 80,216.45 104,281.39 80,327.04 104,425.15 80,329.27 104,428.06 80,223.18 104,290.13 80,108.59 104,141.16 80,091.25 104,118.62 80,185.27 104,240.85 80,301.88 104,392.45
8 Mekanik OH 108,000 144,000 108,292.21 144,389.61 108,441.50 144,588.67 108,444.52 144,592.69 108,301.29 144,401.72 108,146.59 144,195.46 108,123.18 144,164.24 108,250.11 144,333.48 108,407.54 144,543.39
9 Pembantu Mekanik OH 100,000 104,000 100,270.57 104,281.39 100,408.80 104,425.15 100,411.59 104,428.06 100,278.97 104,290.13 100,135.73 104,141.16 100,114.06 104,118.62 100,231.58 104,240.85 100,377.35 104,392.45
10 Kepala Tukang OH 108,000 120,000 108,292.21 120,324.68 108,441.50 120,490.56 108,444.52 120,493.91 108,301.29 120,334.77 108,146.59 120,162.88 108,123.18 120,136.87 108,250.11 120,277.90 108,407.54 120,452.83
11 Pemasak Aspal OH 88,000 120,000 88,238.10 120,324.68 88,359.74 120,490.56 88,362.20 120,493.91 88,245.50 120,334.77 88,119.45 120,162.88 88,100.37 120,136.87 88,203.79 120,277.90 88,332.07 120,452.83

HARGA SATUAN DASAR ALAT KABUPATEN BANYUWANGI TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 375,874 420,000 376,891.28 421,136.37 377,410.86 421,716.95 377,421.37 421,728.69 376,922.89 421,171.69 376,384.49 420,570.08 376,303.01 420,479.04 376,744.76 420,972.65 377,292.68 421,584.89
2 Asphalt Distribution Unit/Jam 231,430 298,000 232,056.20 298,806.28 232,376.11 299,218.22 232,382.58 299,226.55 232,075.66 298,831.34 231,744.16 298,404.49 231,694.00 298,339.89 231,965.99 298,690.12 232,303.35 299,124.52
3 Asphalt Finisher Unit/Jam 136,000 806,000 136,367.97 808,180.76 136,555.96 809,294.91 136,559.77 809,317.43 136,379.40 808,248.53 136,184.60 807,094.02 136,155.12 806,919.30 136,314.95 807,866.57 136,513.20 809,041.48
4 Asphalt Liquid Mixer Unit/Jam 60,651 111,000 60,814.73 111,300.33 60,898.57 111,453.76 60,900.26 111,456.87 60,819.83 111,309.66 60,732.95 111,150.66 60,719.81 111,126.60 60,791.09 111,257.06 60,879.50 111,418.86
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 27,000 81,400 27,073.05 81,619.77 27,110.38 81,732.29 27,111.13 81,734.56 27,075.32 81,626.61 27,036.65 81,510.02 27,030.80 81,492.37 27,062.53 81,588.04 27,101.89 81,706.69
6 Asphalt Mixing Plant Unit/Jam 909,759 5,874,451 912,220.94 5,890,345.23 913,478.51 5,898,465.59 913,503.94 5,898,629.79 912,297.43 5,890,839.18 910,994.30 5,882,424.63 910,797.09 5,881,151.24 911,866.30 5,888,055.29 913,192.46 5,896,618.52
7 Asphalt Sprayer Unit/Jam 48,000 92,737 48,129.87 92,987.91 48,196.22 93,116.11 48,197.56 93,118.70 48,133.91 92,995.71 48,065.15 92,862.88 48,054.75 92,842.77 48,111.16 92,951.76 48,181.13 93,086.95
8 Asphalt Tanker Unit/Jam 351,135 407,000 352,085.27 408,101.20 352,570.65 408,663.80 352,580.47 408,675.18 352,114.80 408,135.42 351,611.83 407,552.44 351,535.72 407,464.21 351,948.40 407,942.55 352,460.25 408,535.83
9 Blending Equipment Unit/Jam 114,119 180,000 114,427.71 180,487.02 114,585.46 180,735.83 114,588.65 180,740.87 114,437.31 180,502.15 114,273.85 180,244.32 114,249.11 180,205.30 114,383.23 180,416.85 114,549.58 180,679.24
10 Bore Pile Machine Unit/Jam 304,497 547,000 305,320.86 548,479.99 305,741.78 549,236.12 305,750.29 549,251.41 305,346.47 548,525.99 304,910.31 547,742.47 304,844.30 547,623.89 305,202.17 548,266.76 305,646.03 549,064.13
11 Bore Pile Machine Dia 60 Unit/Jam 205,893 622,000 206,450.00 623,682.92 206,734.61 624,542.72 206,740.37 624,560.10 206,467.31 623,735.22 206,172.39 622,844.27 206,127.76 622,709.44 206,369.74 623,440.45 206,669.87 624,347.15
12 Bore Pile Machine Dia 80 Unit/Jam 813,995 813,995 816,197.68 816,197.68 817,322.88 817,322.88 817,345.63 817,345.63 816,266.13 816,266.13 815,100.16 815,100.16 814,923.71 814,923.71 815,880.37 815,880.37 817,066.94 817,066.94
13 Bulldozer 100-150 HP Unit/Jam 309,000 500,189 309,836.05 501,542.34 310,263.18 502,233.76 310,271.82 502,247.74 309,862.03 501,584.40 309,419.42 500,867.93 309,352.44 500,759.50 309,715.59 501,347.36 310,166.03 502,076.49
14 Cement Tanker Unit/Jam 296,869 383,000 297,672.10 384,036.27 298,082.46 384,565.69 298,090.76 384,576.40 297,697.06 384,068.47 297,271.82 383,519.86 297,207.47 383,436.84 297,556.37 383,886.97 297,989.12 384,445.27
15 Cold Milling Unit/Jam 248,000 1,404,553 248,671.00 1,408,353.23 249,013.82 1,410,294.77 249,020.75 1,410,334.03 248,691.86 1,408,471.34 248,336.62 1,406,459.46 248,282.86 1,406,154.99 248,574.33 1,407,805.72 248,935.84 1,409,853.15
16 Cold Recycler Unit/Jam 3,904,783 3,904,783 3,915,348.28 3,915,348.28 3,920,745.94 3,920,745.94 3,920,855.08 3,920,855.08 3,915,676.62 3,915,676.62 3,910,083.42 3,910,083.42 3,909,236.98 3,909,236.98 3,913,826.15 3,913,826.15 3,919,518.18 3,919,518.18
17 Compressor 4000-6500 L\M Unit/Jam 101,000 166,026 101,273.27 166,475.21 101,412.89 166,704.71 101,415.71 166,709.35 101,281.76 166,489.17 101,137.09 166,251.35 101,115.20 166,215.36 101,233.90 166,410.49 101,381.13 166,652.51
18 Concrete Breaker Unit/Jam 433,333 826,000 434,505.24 828,234.87 435,104.24 829,376.66 435,116.35 829,399.75 434,541.67 828,304.32 433,920.97 827,121.16 433,827.03 826,942.11 434,336.32 827,912.88 434,967.99 829,116.95
19 Concrete Mixer (350) Unit/Jam 33,000 80,601 33,089.29 80,819.57 33,134.90 80,930.99 33,135.83 80,933.24 33,092.06 80,826.35 33,044.79 80,710.90 33,037.64 80,693.43 33,076.42 80,788.15 33,124.53 80,905.65
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 64,495 91,774 64,669.50 92,022.29 64,758.65 92,149.15 64,760.46 92,151.71 64,674.92 92,030.00 64,582.54 91,898.55 64,568.56 91,878.65 64,644.36 91,986.51 64,738.37 92,120.29
21 Concrete Pan Mixer Unit/Jam 244,199 523,000 244,859.30 524,415.06 245,196.86 525,138.01 245,203.69 525,152.63 244,879.84 524,459.03 244,530.05 523,709.89 244,477.11 523,596.52 244,764.11 524,211.18 245,120.08 524,973.57
22 Concrete Pump Unit/Jam 185,942 250,562 186,445.16 251,239.93 186,702.19 251,586.29 186,707.38 251,593.29 186,460.79 251,261.00 186,194.45 250,902.10 186,154.14 250,847.78 186,372.67 251,142.26 186,643.72 251,507.51
23 Concrete Vibrator Unit/Jam 29,000 69,429 29,078.46 69,616.86 29,118.55 69,712.83 29,119.36 69,714.77 29,080.90 69,622.70 29,039.36 69,523.25 29,033.08 69,508.20 29,067.16 69,589.80 29,109.43 69,691.00
24 Crane 10-15 Ton Unit/Jam 229,000 393,238 229,619.59 394,301.97 229,936.15 394,845.55 229,942.55 394,856.54 229,638.85 394,335.03 229,310.83 393,771.76 229,261.19 393,686.52 229,530.33 394,148.68 229,864.14 394,721.90
25 Crane On Track 35 Ton Unit/Jam 206,691 455,471 207,250.20 456,703.35 207,535.91 457,332.95 207,541.69 457,345.68 207,267.57 456,741.65 206,971.51 456,089.23 206,926.71 455,990.50 207,169.62 456,525.80 207,470.92 457,189.74
26 Crane On Track 75-100 Ton Unit/Jam 324,800 492,000 325,678.88 493,331.18 326,127.86 494,011.28 326,136.93 494,025.03 325,706.19 493,372.55 325,240.95 492,667.81 325,170.54 492,561.16 325,552.27 493,139.39 326,025.73 493,856.59
27 Dump Truck 10 Ton Unit/Jam 287,000 362,310 287,776.52 363,290.29 288,173.25 363,791.11 288,181.27 363,801.24 287,800.66 363,320.75 287,389.56 362,801.78 287,327.34 362,723.24 287,664.65 363,149.05 288,083.01 363,677.19
28 Dump Truck 3-4 M3 Unit/Jam 137,000 269,428 137,370.67 270,156.98 137,560.05 270,529.41 137,563.88 270,536.94 137,382.19 270,179.63 137,185.96 269,793.71 137,156.26 269,735.30 137,317.27 270,051.95 137,516.98 270,444.70
29 Excavator 80-140 HP Unit/Jam 133,000 462,944 133,359.85 464,196.57 133,543.70 464,836.50 133,547.42 464,849.44 133,371.04 464,235.49 133,180.53 463,572.37 133,151.70 463,472.02 133,308.01 464,016.10 133,501.88 464,690.94
30 Flat Bed Truck 3-4 M3 Unit/Jam 128,000 393,000 128,346.32 394,063.32 128,523.26 394,606.57 128,526.84 394,617.56 128,357.09 394,096.37 128,173.74 393,533.43 128,145.99 393,448.24 128,296.43 393,910.12 128,483.01 394,483.00
31 Fulvi Mixer Unit/Jam 737,384 1,152,000 739,379.08 1,155,116.91 740,398.37 1,156,709.34 740,418.99 1,156,741.54 739,441.08 1,155,213.78 738,384.85 1,153,563.66 738,225.01 1,153,313.94 739,091.63 1,154,667.85 740,166.52 1,156,347.13
32 Generator Set Unit/Jam 327,992 552,029 328,879.65 553,522.60 329,333.04 554,285.68 329,342.21 554,301.11 328,907.23 553,569.02 328,437.42 552,778.29 328,366.32 552,658.63 328,751.80 553,307.41 329,229.91 554,112.11
33 Hot Recycler Unit/Jam 2,409,266 7,065,000 2,415,785.09 7,084,115.44 2,419,115.47 7,093,881.52 2,419,182.81 7,094,079.00 2,415,987.68 7,084,709.50 2,412,536.65 7,074,589.61 2,412,014.40 7,073,058.14 2,414,845.93 7,081,361.41 2,418,357.94 7,091,660.11
34 Jack Hammer Unit/Jam 24,000 45,488 24,064.94 45,611.05 24,098.11 45,673.93 24,098.78 45,675.20 24,066.95 45,614.87 24,032.58 45,549.71 24,027.37 45,539.85 24,055.58 45,593.31 24,090.57 45,659.62
35 Launching Gantry Unit/Jam 57,888,632 57,888,632 58,045,258.36 58,045,258.36 58,125,278.89 58,125,278.89 58,126,896.95 58,126,896.95 58,050,125.95 58,050,125.95 57,967,206.39 57,967,206.39 57,954,657.97 57,954,657.97 58,022,692.57 58,022,692.57 58,107,077.28 58,107,077.28
36 Motor Grader > 100 HP Unit/Jam 227,440 536,004 228,055.23 537,454.24 228,369.63 538,195.17 228,375.99 538,210.15 228,074.36 537,499.31 227,748.57 536,731.54 227,699.27 536,615.35 227,966.57 537,245.30 228,298.12 538,026.64
37 Pedestrian Roller Unit/Jam 22,000 77,329 22,059.52 77,538.23 22,089.94 77,645.12 22,090.55 77,647.28 22,061.37 77,544.73 22,029.86 77,433.96 22,025.09 77,417.20 22,050.95 77,508.08 22,083.02 77,620.80
38 Pile Driver + Hammer Unit/Jam 85,390 268,144 85,620.74 268,869.50 85,738.77 269,240.17 85,741.16 269,247.66 85,627.92 268,892.05 85,505.61 268,507.96 85,487.10 268,449.84 85,587.45 268,764.98 85,711.92 269,155.85
39 Rock Drill Breaker Unit/Jam 82,996 270,000 83,220.16 270,730.53 83,334.88 271,103.75 83,337.20 271,111.30 83,227.13 270,753.23 83,108.25 270,366.48 83,090.26 270,307.95 83,187.80 270,625.28 83,308.79 271,018.86
40 Split Form Paver Unit/Jam 175,568 175,568 176,042.64 176,042.64 176,285.33 176,285.33 176,290.23 176,290.23 176,057.40 176,057.40 175,805.92 175,805.92 175,767.86 175,767.86 175,974.20 175,974.20 176,230.12 176,230.12
41 Stone Crusher Unit/Jam 362,000 735,301 362,979.45 737,290.47 363,479.85 738,306.89 363,489.96 738,327.44 363,009.89 737,352.30 362,491.36 736,299.05 362,412.89 736,139.66 362,838.33 737,003.84 363,366.02 738,075.69
42 Tamper Unit/Jam 34,000 70,227 34,091.99 70,417.05 34,138.99 70,514.13 34,139.94 70,516.09 34,094.85 70,422.96 34,046.15 70,322.37 34,038.78 70,307.14 34,078.74 70,389.68 34,128.30 70,492.05
43 Tandem Roller 6-8 T Unit/Jam 113,000 396,000 113,305.74 397,071.44 113,461.94 397,618.84 113,465.10 397,629.91 113,315.24 397,104.74 113,153.38 396,537.51 113,128.88 396,451.67 113,261.69 396,917.07 113,426.41 397,494.32
44 Three Wheel Roller 6-8 T Unit/Jam 112,523 198,430 112,827.33 198,966.88 112,982.87 199,241.18 112,986.01 199,246.72 112,836.79 198,983.57 112,675.61 198,699.34 112,651.22 198,656.32 112,783.46 198,889.53 112,947.49 199,178.78
45 Tire Roller 8-10 T Unit/Jam 108,000 363,000 108,292.21 363,982.15 108,441.50 364,483.93 108,444.52 364,494.08 108,301.29 364,012.68 108,146.59 363,492.71 108,123.18 363,414.03 108,250.11 363,840.65 108,407.54 364,369.80
46 Track Loader 75-100 HP Unit/Jam 188,336 429,324 188,845.74 430,485.60 189,106.08 431,079.06 189,111.34 431,091.06 188,861.57 430,521.70 188,591.80 429,906.74 188,550.98 429,813.68 188,772.32 430,318.25 189,046.86 430,944.07
47 Trailer 20 Ton Unit/Jam 304,051 463,977 304,873.84 465,232.36 305,294.13 465,873.72 305,302.63 465,886.69 304,899.41 465,271.37 304,463.88 464,606.77 304,397.97 464,506.20 304,755.32 465,051.50 305,198.53 465,727.84
48 Trailler 15 Ton Unit/Jam 263,351 401,000 264,063.96 402,084.97 264,427.99 402,639.28 264,435.35 402,650.49 264,086.10 402,118.69 263,708.88 401,544.29 263,651.79 401,457.37 263,961.30 401,928.65 264,345.19 402,513.19
49 Truck Mixer (agitator) Unit/Jam 331,184 487,000 332,080.43 488,317.65 332,538.23 488,990.84 332,547.49 489,004.45 332,108.28 488,358.60 331,633.89 487,661.02 331,562.10 487,555.46 331,951.33 488,127.81 332,434.10 488,837.72
50 Vibrating Rammer Unit/Jam 29,000 67,833 29,078.46 68,016.47 29,118.55 68,110.24 29,119.36 68,112.14 29,080.90 68,022.18 29,039.36 67,925.01 29,033.08 67,910.31 29,067.16 67,990.03 29,109.43 68,088.91
51 Vibratory Roller 5-8 T Unit/Jam 143,000 351,000 143,386.91 351,949.68 143,584.58 352,434.88 143,588.58 352,444.69 143,398.93 351,979.20 143,194.10 351,476.43 143,163.10 351,400.34 143,331.17 351,812.86 143,539.62 352,324.52
52 Water Pump 70-100 MM Unit/Jam 22,000 53,596 22,059.52 53,741.01 22,089.94 53,815.10 22,090.55 53,816.60 22,061.37 53,745.52 22,029.86 53,668.75 22,025.09 53,657.13 22,050.95 53,720.12 22,083.02 53,798.25
53 Water Tanker 3000-4500 L Unit/Jam 154,000 236,026 154,416.67 236,664.60 154,629.55 236,990.87 154,633.85 236,997.46 154,429.62 236,684.45 154,209.03 236,346.37 154,175.65 236,295.20 154,356.64 236,572.60 154,581.13 236,916.66
54 Welding Set Unit/Jam 65,000 103,744 65,175.87 104,025.19 65,265.72 104,168.60 65,267.53 104,171.50 65,181.33 104,033.92 65,088.23 103,885.31 65,074.14 103,862.83 65,150.53 103,984.75 65,245.28 104,135.98
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 168,000 441,180 168,454.55 442,373.68 168,686.78 442,983.53 168,691.48 442,995.86 168,468.68 442,410.78 168,228.03 441,778.83 168,191.62 441,683.20 168,389.06 442,201.70 168,633.96 442,844.81
HARGA SATUAN DASAR BAHAN KABUPATEN BANYUWANGI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 251,000 251,000 251,679.12 251,679.12 252,026.08 252,026.08 252,033.10 252,033.10 251,700.22 251,700.22 251,340.69 251,340.69 251,286.28 251,286.28 251,581.28 251,581.28 251,947.16 251,947.16
2 Agregat Pecah Mesin 20-30 mm M3 239,000 320,250 239,646.65 321,116.49 239,977.03 321,559.17 239,983.71 321,568.12 239,666.75 321,143.41 239,324.40 320,684.69 239,272.60 320,615.27 239,553.49 320,991.65 239,901.88 321,458.48
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 251,000 325,500 251,679.12 326,380.69 252,026.08 326,830.63 252,033.10 326,839.73 251,700.22 326,408.06 251,340.69 325,941.81 251,286.28 325,871.26 251,581.28 326,253.81 251,947.16 326,728.29
4 Bahan Agr. Base Kelas A M3 263,000 263,445 263,711.59 264,157.79 264,075.14 264,521.96 264,082.49 264,529.32 263,733.70 264,179.94 263,356.98 263,802.58 263,299.97 263,745.48 263,609.07 264,055.10 263,992.44 264,439.12
5 Bahan Agr. Base Kelas B M3 247,000 247,485 247,668.30 248,154.61 248,009.73 248,496.71 248,016.63 248,503.63 247,689.07 248,175.42 247,335.26 247,820.92 247,281.72 247,767.27 247,572.01 248,058.14 247,932.07 248,418.90
6 Bahan Agr. Base Kelas C M3 227,000 227,000 227,614.18 227,614.18 227,927.97 227,927.97 227,934.31 227,934.31 227,633.27 227,633.27 227,308.12 227,308.12 227,258.91 227,258.91 227,525.70 227,525.70 227,856.60 227,856.60
7 Bahan Agr. Base Kelas C2 M3 207,000 207,000 207,560.07 207,560.07 207,846.21 207,846.21 207,852.00 207,852.00 207,577.48 207,577.48 207,280.97 207,280.97 207,236.10 207,236.10 207,479.38 207,479.38 207,781.12 207,781.12
8 Bahan Agr. Base Kelas S M3 168,000 168,000 168,454.55 168,454.55 168,686.78 168,686.78 168,691.48 168,691.48 168,468.68 168,468.68 168,228.03 168,228.03 168,191.62 168,191.62 168,389.06 168,389.06 168,633.96 168,633.96
9 Bahan Pilihan M3 107,000 199,054 107,289.50 199,592.57 107,437.41 199,867.73 107,440.40 199,873.29 107,298.50 199,609.31 107,145.24 199,324.18 107,122.04 199,281.04 107,247.79 199,514.98 107,403.77 199,805.14
10 Bahan Tanah Timbunan M3 96,000 160,650 96,259.74 161,084.66 96,392.45 161,306.73 96,395.13 161,311.22 96,267.81 161,098.17 96,130.30 160,868.06 96,109.49 160,833.23 96,222.32 161,022.04 96,362.26 161,256.22
11 Batu Belah/Kerakal M3 120,000 270,000 120,324.68 270,730.53 120,490.56 271,103.75 120,493.91 271,111.30 120,334.77 270,753.23 120,162.88 270,366.48 120,136.87 270,307.95 120,277.90 270,625.28 120,452.83 271,018.86
12 Batu Kali M3 136,000 298,000 136,367.97 298,806.28 136,555.96 299,218.22 136,559.77 299,226.55 136,379.40 298,831.34 136,184.60 298,404.49 136,155.12 298,339.89 136,314.95 298,690.12 136,513.20 299,124.52
13 Chipping M3 178,000 178,000 178,481.61 178,481.61 178,727.66 178,727.66 178,732.63 178,732.63 178,496.57 178,496.57 178,241.61 178,241.61 178,203.02 178,203.02 178,412.22 178,412.22 178,671.69 178,671.69
14 Chipping (kg) Kg 239 239 239.65 239.65 239.98 239.98 239.98 239.98 239.67 239.67 239.32 239.32 239.27 239.27 239.55 239.55 239.90 239.90
15 Filler Cement Kg 1,000 2,000 1,002.71 2,005.41 1,004.09 2,008.18 1,004.12 2,008.23 1,002.79 2,005.58 1,001.36 2,002.71 1,001.14 2,002.28 1,002.32 2,004.63 1,003.77 2,007.55
16 Gebalan Rumput M' 5,000 5,000 5,013.53 5,013.53 5,020.44 5,020.44 5,020.58 5,020.58 5,013.95 5,013.95 5,006.79 5,006.79 5,005.70 5,005.70 5,011.58 5,011.58 5,018.87 5,018.87
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 235,000 239,000 235,635.83 239,646.65 235,960.67 239,977.03 235,967.24 239,983.71 235,655.59 239,666.75 235,318.98 239,324.40 235,268.03 239,272.60 235,544.22 239,553.49 235,886.78 239,901.88
18 Kapur M3 80,000 80,000 80,216.45 80,216.45 80,327.04 80,327.04 80,329.27 80,329.27 80,223.18 80,223.18 80,108.59 80,108.59 80,091.25 80,091.25 80,185.27 80,185.27 80,301.88 80,301.88
19 Pasir Beton (Kasar) M3 200,000 379,000 200,541.13 380,025.44 200,817.59 380,549.34 200,823.18 380,559.93 200,557.95 380,057.31 200,271.47 379,514.43 200,228.11 379,432.28 200,463.17 379,877.70 200,754.71 380,430.17
20 Pasir Halus (untuk HRS) M3 184,000 239,000 184,497.84 239,646.65 184,752.19 239,977.03 184,757.33 239,983.71 184,513.31 239,666.75 184,249.75 239,324.40 184,209.87 239,272.60 184,426.11 239,553.49 184,694.33 239,901.88
21 Pasir Pasang (Sedang) M3 124,000 212,000 124,335.50 212,573.60 124,506.91 212,866.65 124,510.37 212,872.58 124,345.93 212,591.42 124,168.31 212,287.76 124,141.43 212,241.80 124,287.16 212,490.96 124,467.92 212,799.99
22 Pasir Urug M3 113,000 140,000 113,305.74 140,378.79 113,461.94 140,572.32 113,465.10 140,576.23 113,315.24 140,390.56 113,153.38 140,190.03 113,128.88 140,159.68 113,261.69 140,324.22 113,426.41 140,528.30
23 Pasir Urug (ada unsur lempung) M3 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
24 Sirtu M3 89,000 124,000 89,240.80 124,335.50 89,363.83 124,506.91 89,366.32 124,510.37 89,248.29 124,345.93 89,120.80 124,168.31 89,101.51 124,141.43 89,206.11 124,287.16 89,335.85 124,467.92
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 36,000 56,000 36,097.40 56,151.52 36,147.17 56,228.93 36,148.17 56,230.49 36,100.43 56,156.23 36,048.86 56,076.01 36,041.06 56,063.87 36,083.37 56,129.69 36,135.85 56,211.32
26 Anti Pengelupas Liter 80,000 80,000 80,216.45 80,216.45 80,327.04 80,327.04 80,329.27 80,329.27 80,223.18 80,223.18 80,108.59 80,108.59 80,091.25 80,091.25 80,185.27 80,185.27 80,301.88 80,301.88
27 Arbocell Kg 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
28 Asbuton Curah Kg 10,000 12,000 10,027.06 12,032.47 10,040.88 12,049.06 10,041.16 12,049.39 10,027.90 12,033.48 10,013.57 12,016.29 10,011.41 12,013.69 10,023.16 12,027.79 10,037.74 12,045.28
29 Aspal Emulsi (CRS-1/53 R-65) Kg 7,000 12,705 7,018.94 12,739.38 7,028.62 12,756.94 7,028.81 12,757.29 7,019.53 12,740.44 7,009.50 12,722.25 7,007.98 12,719.49 7,016.21 12,734.42 7,026.41 12,752.94
30 Aspal Emulsi (CSS-1) Kg 7,000 12,705 7,018.94 12,739.38 7,028.62 12,756.94 7,028.81 12,757.29 7,019.53 12,740.44 7,009.50 12,722.25 7,007.98 12,719.49 7,016.21 12,734.42 7,026.41 12,752.94
31 Aspal Minyak (Drum) Kg 8,000 9,474 8,021.65 9,499.63 8,032.70 9,512.73 8,032.93 9,512.99 8,022.32 9,500.43 8,010.86 9,486.86 8,009.12 9,484.81 8,018.53 9,495.94 8,030.19 9,509.75
32 Aspal Modifikasi (BNA) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
33 Aspal Modifikasi (JAP-57) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
34 Aspal Modifikasi (Retona) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
35 Aspal Modifikasi (Starbit) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
36 Aspal Minyak (Curah) Kg 6,000 8,000 6,016.23 8,021.65 6,024.53 8,032.70 6,024.70 8,032.93 6,016.74 8,022.32 6,008.14 8,010.86 6,006.84 8,009.12 6,013.90 8,018.53 6,022.64 8,030.19
37 Assetilline Botol 92,000 124,000 92,248.92 124,335.50 92,376.09 124,506.91 92,378.66 124,510.37 92,256.66 124,345.93 92,124.88 124,168.31 92,104.93 124,141.43 92,213.06 124,287.16 92,347.17 124,467.92
38 Bahan Pengawet: Kreosot Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
39 Bensin Liter 6,000 8,000 6,016.23 8,021.65 6,024.53 8,032.70 6,024.70 8,032.93 6,016.74 8,022.32 6,008.14 8,010.86 6,006.84 8,009.12 6,013.90 8,018.53 6,022.64 8,030.19
40 Beton B-0 M3 431,000 470,840 432,166.14 472,114.34 432,761.92 472,765.20 432,773.96 472,778.36 432,202.38 472,153.94 431,585.01 471,479.50 431,491.59 471,377.44 431,998.13 471,930.80 432,626.40 472,617.15
41 Beton K-125 (fc' 10 MPa) M3 439,000 486,801 440,187.78 488,118.22 440,794.62 488,791.13 440,806.89 488,804.74 440,224.70 488,159.15 439,595.87 487,461.86 439,500.71 487,356.34 440,016.65 487,928.46 440,656.59 488,638.07
42 Beton K-175 (fc' 15 MPa) M3 499,000 526,703 500,350.12 528,127.91 501,039.90 528,855.98 501,053.85 528,870.70 500,392.08 528,172.20 499,677.31 527,417.75 499,569.15 527,303.58 500,155.60 527,922.59 500,883.00 528,690.37
43 Beton K-250 (fc' 20 MPa) M3 538,000 586,555 539,455.64 588,142.45 540,199.33 588,953.25 540,214.37 588,969.65 539,500.88 588,191.77 538,730.25 587,351.59 538,613.63 587,224.44 539,245.92 587,913.80 540,030.17 588,768.83
44 Beton K-300 (fc' 25 MPa) M3 598,000 610,496 599,617.98 612,148.26 600,444.61 612,992.16 600,461.32 613,009.22 599,668.26 612,199.59 598,811.69 611,325.12 598,682.06 611,192.78 599,384.87 611,910.28 600,256.58 612,800.21
45 Beton K-350 (fc' 30 MPa) M3 628,000 634,438 629,699.15 636,154.07 630,567.25 637,031.07 630,584.80 637,048.80 629,751.96 636,207.42 628,852.41 635,298.65 628,716.28 635,161.13 629,454.35 635,906.76 630,369.79 636,831.59
46 Beton K-400 (fc' 35 MPa) M3 658,379 658,379 660,159.89 660,159.89 661,069.98 661,069.98 661,088.38 661,088.38 660,215.25 660,215.25 659,272.19 659,272.19 659,129.47 659,129.47 659,903.24 659,903.24 660,862.97 660,862.97
47 Beton K-450 (fc' 40 MPa) M3 690,300 690,300 692,167.64 692,167.64 693,121.85 693,121.85 693,141.15 693,141.15 692,225.68 692,225.68 691,236.90 691,236.90 691,087.27 691,087.27 691,898.55 691,898.55 692,904.81 692,904.81
48 Beton K-500 (fc' 45 MPa) M3 718,231 718,231 720,174.42 720,174.42 721,167.25 721,167.25 721,187.32 721,187.32 720,234.82 720,234.82 719,206.02 719,206.02 719,050.33 719,050.33 719,894.45 719,894.45 720,941.42 720,941.42
49 Bunker Oil Liter 3,000 3,000 3,008.12 3,008.12 3,012.26 3,012.26 3,012.35 3,012.35 3,008.37 3,008.37 3,004.07 3,004.07 3,003.42 3,003.42 3,006.95 3,006.95 3,011.32 3,011.32
50 Cat Kg 46,000 73,000 46,124.46 73,197.51 46,188.05 73,298.42 46,189.33 73,300.46 46,128.33 73,203.65 46,062.44 73,099.09 46,052.47 73,083.26 46,106.53 73,169.06 46,173.58 73,275.47
51 Cat Anti Karat Kg 24,000 58,000 24,064.94 58,156.93 24,098.11 58,237.10 24,098.78 58,238.72 24,066.95 58,161.80 24,032.58 58,078.73 24,027.37 58,066.15 24,055.58 58,134.32 24,090.57 58,218.87
52 Cat Marka (Non Thermoplas) Kg 52,000 52,000 52,140.69 52,140.69 52,212.57 52,212.57 52,214.03 52,214.03 52,145.07 52,145.07 52,070.58 52,070.58 52,059.31 52,059.31 52,120.42 52,120.42 52,196.22 52,196.22
53 Cat Marka (Thermoplastic) Kg 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
54 Cerucuk Diameter 10-15 cm M' 18,000 20,000 18,048.70 20,054.11 18,073.58 20,081.76 18,074.09 20,082.32 18,050.22 20,055.79 18,024.43 20,027.15 18,020.53 20,022.81 18,041.69 20,046.32 18,067.92 20,075.47
55 Cold Mix (Aspal Dingin) Kg 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,041,000 1,041,000 1,043,816.59 1,043,816.59 1,045,255.58 1,045,255.58 1,045,284.68 1,045,284.68 1,043,904.12 1,043,904.12 1,042,412.99 1,042,412.99 1,042,187.34 1,042,187.34 1,043,410.79 1,043,410.79 1,044,928.26 1,044,928.26
57 Curing Compound Liter 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 487,000 487,000 488,317.65 488,317.65 488,990.84 488,990.84 489,004.45 489,004.45 488,358.60 488,358.60 487,661.02 487,661.02 487,555.46 487,555.46 488,127.81 488,127.81 488,837.72 488,837.72
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 567,000 567,000 568,534.11 568,534.11 569,317.88 569,317.88 569,333.73 569,333.73 568,581.78 568,581.78 567,769.61 567,769.61 567,646.70 567,646.70 568,313.08 568,313.08 569,139.60 569,139.60
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 662,000 718,000 663,791.14 719,942.66 664,706.24 720,935.16 664,724.74 720,955.23 663,846.81 720,003.03 662,898.56 718,974.57 662,755.06 718,818.93 663,533.09 719,662.77 664,498.09 720,709.41
61 Kerosen/Minyak Tanah Liter 8,000 13,860 8,021.65 13,897.50 8,032.70 13,916.66 8,032.93 13,917.05 8,022.32 13,898.67 8,010.86 13,878.81 8,009.12 13,875.81 8,018.53 13,892.10 8,030.19 13,912.30
62 Minyak Fluks Liter 5,000 6,000 5,013.53 6,016.23 5,020.44 6,024.53 5,020.58 6,024.70 5,013.95 6,016.74 5,006.79 6,008.14 5,005.70 6,006.84 5,011.58 6,013.90 5,018.87 6,022.64
63 Minyak Pelumas/Olie Liter 21,000 52,448 21,056.82 52,589.91 21,085.85 52,662.41 21,086.43 52,663.87 21,058.58 52,594.32 21,028.50 52,519.19 21,023.95 52,507.82 21,048.63 52,569.46 21,079.24 52,645.92
64 Oxygen (Isi 6 M3) Botol 134,000 137,000 134,362.56 137,370.67 134,547.79 137,560.05 134,551.53 137,563.88 134,373.82 137,382.19 134,181.88 137,185.96 134,152.84 137,156.26 134,310.32 137,317.27 134,505.66 137,516.98
65 Polytene 125 Mikron Kg 20,000 21,000 20,054.11 21,056.82 20,081.76 21,085.85 20,082.32 21,086.43 20,055.79 21,058.58 20,027.15 21,028.50 20,022.81 21,023.95 20,046.32 21,048.63 20,075.47 21,079.24
66 Sand Sheet Ton 958,000 1,101,000 960,592.02 1,103,978.92 961,916.28 1,105,500.86 961,943.05 1,105,531.63 960,672.57 1,104,071.50 959,300.33 1,102,494.43 959,092.67 1,102,255.77 960,218.57 1,103,549.74 961,615.06 1,105,154.68
67 Seal Coat M2 78,000 88,000 78,211.04 88,238.10 78,318.86 88,359.74 78,321.04 88,362.20 78,217.60 88,245.50 78,105.87 88,119.45 78,088.96 88,100.37 78,180.64 88,203.79 78,294.34 88,332.07
68 Seal Guard Kg 23,000 29,000 23,062.23 29,078.46 23,094.02 29,118.55 23,094.67 29,119.36 23,064.16 29,080.90 23,031.22 29,039.36 23,026.23 29,033.08 23,053.26 29,067.16 23,086.79 29,109.43
69 Semen/PC (50 kg) Zak 53,000 63,000 53,143.40 63,170.46 53,216.66 63,257.54 53,218.14 63,259.30 53,147.86 63,175.75 53,071.94 63,085.51 53,060.45 63,071.86 53,122.74 63,145.90 53,200.00 63,237.73
70 Semen/PC (kg) Kg 1,000 2,800 1,002.71 2,807.58 1,004.09 2,811.45 1,004.12 2,811.52 1,002.79 2,807.81 1,001.36 2,803.80 1,001.14 2,803.19 1,002.32 2,806.48 1,003.77 2,810.57
71 Slurry Seal Ton 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
72 Solar Liter 8,000 9,576 8,021.65 9,601.91 8,032.70 9,615.15 8,032.93 9,615.41 8,022.32 9,602.71 8,010.86 9,589.00 8,009.12 9,586.92 8,018.53 9,598.18 8,030.19 9,612.14
73 Thinner Liter 14,000 25,000 14,037.88 25,067.64 14,057.23 25,102.20 14,057.62 25,102.90 14,039.06 25,069.74 14,019.00 25,033.93 14,015.97 25,028.51 14,032.42 25,057.90 14,052.83 25,094.34
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 13,000 14,000 13,035.17 14,037.88 13,053.14 14,057.23 13,053.51 14,057.62 13,036.27 14,039.06 13,017.65 14,019.00 13,014.83 14,015.97 13,030.11 14,032.42 13,049.06 14,052.83
75 Baja Prategang Kg 12,000 16,000 12,032.47 16,043.29 12,049.06 16,065.41 12,049.39 16,065.85 12,033.48 16,044.64 12,016.29 16,021.72 12,013.69 16,018.25 12,027.79 16,037.05 12,045.28 16,060.38
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 7,000 13,000 7,018.94 13,035.17 7,028.62 13,053.14 7,028.81 13,053.51 7,019.53 13,036.27 7,009.50 13,017.65 7,007.98 13,014.83 7,016.21 13,030.11 7,026.41 13,049.06
77 Baja Tulangan (Polos) U25 Kg 9,000 14,516 9,024.35 14,555.28 9,036.79 14,575.34 9,037.04 14,575.75 9,025.11 14,556.50 9,012.22 14,535.70 9,010.27 14,532.56 9,020.84 14,549.62 9,033.96 14,570.78
78 Baja Tulangan (Polos) U32 Kg 9,000 14,516 9,024.35 14,555.28 9,036.79 14,575.34 9,037.04 14,575.75 9,025.11 14,556.50 9,012.22 14,535.70 9,010.27 14,532.56 9,020.84 14,549.62 9,033.96 14,570.78
79 Baja Tulangan (Polos) U36 Kg 9,000 14,516 9,024.35 14,555.28 9,036.79 14,575.34 9,037.04 14,575.75 9,025.11 14,556.50 9,012.22 14,535.70 9,010.27 14,532.56 9,020.84 14,549.62 9,033.96 14,570.78
80 Baja Tulangan (Ulir) D16 Kg 9,000 15,750 9,024.35 15,792.61 9,036.79 15,814.39 9,037.04 15,814.83 9,025.11 15,793.94 9,012.22 15,771.38 9,010.27 15,767.96 9,020.84 15,786.47 9,033.96 15,809.43
81 Baja Tulangan (Ulir) D19 Kg 9,000 15,750 9,024.35 15,792.61 9,036.79 15,814.39 9,037.04 15,814.83 9,025.11 15,793.94 9,012.22 15,771.38 9,010.27 15,767.96 9,020.84 15,786.47 9,033.96 15,809.43
82 Baja Tulangan (Ulir) D24 Kg 9,000 15,750 9,024.35 15,792.61 9,036.79 15,814.39 9,037.04 15,814.83 9,025.11 15,793.94 9,012.22 15,771.38 9,010.27 15,767.96 9,020.84 15,786.47 9,033.96 15,809.43
83 Baja Tulangan (Ulir) D32 Kg 9,000 15,750 9,024.35 15,792.61 9,036.79 15,814.39 9,037.04 15,814.83 9,025.11 15,793.94 9,012.22 15,771.38 9,010.27 15,767.96 9,020.84 15,786.47 9,033.96 15,809.43
84 Baja Tulangan (Ulir) D36 Kg 9,000 15,750 9,024.35 15,792.61 9,036.79 15,814.39 9,037.04 15,814.83 9,025.11 15,793.94 9,012.22 15,771.38 9,010.27 15,767.96 9,020.84 15,786.47 9,033.96 15,809.43
85 Besi Beton Kg 9,000 10,000 9,024.35 10,027.06 9,036.79 10,040.88 9,037.04 10,041.16 9,025.11 10,027.90 9,012.22 10,013.57 9,010.27 10,011.41 9,020.84 10,023.16 9,033.96 10,037.74
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 9,177,000 11,013,000 9,201,829.78 11,042,797.36 9,214,515.32 11,058,020.83 9,214,771.83 11,058,328.66 9,202,601.43 11,043,723.39 9,189,456.32 11,027,948.39 9,187,467.03 11,025,561.12 9,198,252.46 11,038,504.34 9,211,629.84 11,054,558.08
87 Box Culvert Type DUB 200×200 M' 9,975,000 11,891,000 10,001,988.89 11,923,172.92 10,015,777.52 11,939,610.07 10,016,056.33 11,939,942.44 10,002,827.64 11,924,172.78 9,988,539.47 11,907,140.14 9,986,377.21 11,904,562.55 9,998,100.50 11,918,537.65 10,012,641.13 11,935,871.25
88 Box Culvert Type uk 300×200 M' 11,013,000 11,013,000 11,042,797.36 11,042,797.36 11,058,020.83 11,058,020.83 11,058,328.66 11,058,328.66 11,043,723.39 11,043,723.39 11,027,948.39 11,027,948.39 11,025,561.12 11,025,561.12 11,038,504.34 11,038,504.34 11,054,558.08 11,054,558.08
89 Casing M2 10,000 11,000 10,027.06 11,029.76 10,040.88 11,044.97 10,041.16 11,045.28 10,027.90 11,030.69 10,013.57 11,014.93 10,011.41 11,012.55 10,023.16 11,025.47 10,037.74 11,041.51
90 Ducting (Kabel Prestress) M' 134,000 155,000 134,362.56 155,419.38 134,547.79 155,633.64 134,551.53 155,637.97 134,373.82 155,432.41 134,181.88 155,210.39 134,152.84 155,176.79 134,310.32 155,358.96 134,505.66 155,584.90
91 Ducting (Strand Prestress) M' 126,000 135,000 126,340.91 135,365.26 126,515.08 135,551.88 126,518.61 135,555.65 126,351.51 135,376.61 126,171.02 135,183.24 126,143.71 135,153.98 126,291.80 135,312.64 126,475.47 135,509.43
92 Expansion Cap M2 7,000 8,000 7,018.94 8,021.65 7,028.62 8,032.70 7,028.81 8,032.93 7,019.53 8,022.32 7,009.50 8,010.86 7,007.98 8,009.12 7,016.21 8,018.53 7,026.41 8,030.19
93 Expansion Join Baja Siku M' 1,589,000 1,737,000 1,593,299.28 1,741,699.72 1,595,495.79 1,744,100.81 1,595,540.20 1,744,149.36 1,593,432.89 1,741,845.78 1,591,156.81 1,739,357.70 1,590,812.37 1,738,981.17 1,592,679.87 1,741,022.61 1,594,996.17 1,743,554.65
94 Expansion Join Tipe Rubber M' 1,175,000 1,257,000 1,178,179.14 1,260,401.01 1,179,803.37 1,262,138.58 1,179,836.21 1,262,173.72 1,178,277.94 1,260,506.70 1,176,594.88 1,258,706.18 1,176,340.17 1,258,433.70 1,177,721.11 1,259,911.01 1,179,433.92 1,261,743.35
95 Expansion Join Tipe Torma M' 1,427,000 1,442,000 1,430,860.97 1,445,901.55 1,432,833.54 1,447,894.86 1,432,873.42 1,447,935.16 1,430,980.96 1,446,022.80 1,428,936.93 1,443,957.29 1,428,627.60 1,443,644.71 1,430,304.70 1,445,339.44 1,432,384.85 1,447,441.46
96 Expansion Tipe Joint Asphaltic Plug M' 1,599,000 1,711,000 1,603,326.34 1,715,629.37 1,605,536.67 1,717,994.52 1,605,581.36 1,718,042.34 1,603,460.79 1,715,773.24 1,601,170.39 1,713,322.41 1,600,823.78 1,712,951.52 1,602,703.03 1,714,962.40 1,605,033.90 1,717,456.54
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 32,000 52,000 32,086.58 52,140.69 32,130.82 52,212.57 32,131.71 52,214.03 32,089.27 52,145.07 32,043.43 52,070.58 32,036.50 52,059.31 32,074.11 52,120.42 32,120.75 52,196.22
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 25,000 26,000 25,067.64 26,070.35 25,102.20 26,106.29 25,102.90 26,107.01 25,069.74 26,072.53 25,033.93 26,035.29 25,028.51 26,029.65 25,057.90 26,060.21 25,094.34 26,098.11
99 Glass Bead Kg 35,000 56,000 35,094.70 56,151.52 35,143.08 56,228.93 35,144.06 56,230.49 35,097.64 56,156.23 35,047.51 56,076.01 35,039.92 56,063.87 35,081.05 56,129.69 35,132.07 56,211.32
100 Joint Sealent Kg 34,000 36,000 34,091.99 36,097.40 34,138.99 36,147.17 34,139.94 36,148.17 34,094.85 36,100.43 34,046.15 36,048.86 34,038.78 36,041.06 34,078.74 36,083.37 34,128.30 36,135.85
101 Joint Socket Pile 16×16×16 Set 72,000 73,000 72,194.81 73,197.51 72,294.33 73,298.42 72,296.35 73,300.46 72,200.86 73,203.65 72,097.73 73,099.09 72,082.12 73,083.26 72,166.74 73,169.06 72,271.70 73,275.47
102 Joint Socket Pile 35×35 Set 602,000 624,000 603,628.80 625,688.33 604,460.96 626,550.89 604,477.79 626,568.34 603,679.42 625,740.80 602,817.12 624,846.98 602,686.62 624,711.72 603,394.14 625,445.08 604,271.68 626,354.69
103 Kawat Beton Kg 12,000 19,890 12,032.47 19,943.82 12,049.06 19,971.31 12,049.39 19,971.87 12,033.48 19,945.49 12,016.29 19,917.00 12,013.69 19,912.69 12,027.79 19,936.06 12,045.28 19,965.06
104 Kawat Bronjong Kg 13,000 27,000 13,035.17 27,073.05 13,053.14 27,110.38 13,053.51 27,111.13 13,036.27 27,075.32 13,017.65 27,036.65 13,014.83 27,030.80 13,030.11 27,062.53 13,049.06 27,101.89
105 Kawat Las Dos 88,000 144,000 88,238.10 144,389.61 88,359.74 144,588.67 88,362.20 144,592.69 88,245.50 144,401.72 88,119.45 144,195.46 88,100.37 144,164.24 88,203.79 144,333.48 88,332.07 144,543.39
106 Kayu Acuan (Kelas III/Meranti) M3 1,995,000 4,000,000 2,000,397.78 4,010,822.61 2,003,155.50 4,016,351.89 2,003,211.27 4,016,463.69 2,000,565.53 4,011,158.95 1,997,707.89 4,005,429.36 1,997,275.44 4,004,562.29 1,999,620.10 4,009,263.36 2,002,528.23 4,015,094.19
107 Kayu Perancah (Gelam) M3 2,153,832 2,210,556 2,159,659.52 2,216,536.84 2,162,636.80 2,219,592.53 2,162,697.01 2,219,654.32 2,159,840.63 2,216,722.71 2,156,755.48 2,213,556.32 2,156,288.60 2,213,077.14 2,158,819.93 2,215,675.13 2,161,959.59 2,218,897.48
108 Kerb Pracetak Type 1 (Peninggi) Buah 31,000 44,000 31,083.88 44,119.05 31,126.73 44,179.87 31,127.59 44,181.10 31,086.48 44,122.75 31,042.08 44,059.72 31,035.36 44,050.19 31,071.79 44,101.90 31,116.98 44,166.04
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 52,000 76,000 52,140.69 76,205.63 52,212.57 76,310.69 52,214.03 76,312.81 52,145.07 76,212.02 52,070.58 76,103.16 52,059.31 76,086.68 52,120.42 76,176.00 52,196.22 76,286.79
110 Marmer Nama Jembatan Buah 468,000 479,000 469,266.25 480,296.01 469,913.17 480,958.14 469,926.25 480,971.53 469,305.60 480,336.28 468,635.24 479,650.17 468,533.79 479,546.33 469,083.81 480,109.29 469,766.02 480,807.53
111 Mata Kucing Buah 114,000 126,000 114,308.44 126,340.91 114,466.03 126,515.08 114,469.22 126,518.61 114,318.03 126,351.51 114,154.74 126,171.02 114,130.03 126,143.71 114,264.01 126,291.80 114,430.18 126,475.47
112 Matras Concrete (Tebal=10 cm) M2 106,000 117,000 106,286.80 117,316.56 106,433.33 117,478.29 106,436.29 117,481.56 106,295.71 117,326.40 106,143.88 117,158.81 106,120.90 117,133.45 106,245.48 117,270.95 106,400.00 117,441.51
113 Mini Pile 16×16×16 M' 108,000 108,000 108,292.21 108,292.21 108,441.50 108,441.50 108,444.52 108,444.52 108,301.29 108,301.29 108,146.59 108,146.59 108,123.18 108,123.18 108,250.11 108,250.11 108,407.54 108,407.54
114 Mini Timber Pile Buah 24,000 25,537 24,064.94 25,606.20 24,098.11 25,641.50 24,098.78 25,642.22 24,066.95 25,608.35 24,032.58 25,571.77 24,027.37 25,566.23 24,055.58 25,596.25 24,090.57 25,633.47
115 Multipleks 12 mm Lbr 128,000 165,000 128,346.32 165,446.43 128,523.26 165,674.52 128,526.84 165,679.13 128,357.09 165,460.31 128,173.74 165,223.96 128,145.99 165,188.19 128,296.43 165,382.11 128,483.01 165,622.64
116 Paku Kg 12,000 18,920 12,032.47 18,971.19 12,049.06 18,997.34 12,049.39 18,997.87 12,033.48 18,972.78 12,016.29 18,945.68 12,013.69 18,941.58 12,027.79 18,963.82 12,045.28 18,991.40
117 Paving Block (Model Bata 8 cm) M2 50,000 76,000 50,135.28 76,205.63 50,204.40 76,310.69 50,205.80 76,312.81 50,139.49 76,212.02 50,067.87 76,103.16 50,057.03 76,086.68 50,115.79 76,176.00 50,188.68 76,286.79
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 52,670,000 53,052,000 52,812,506.76 53,195,540.32 52,885,313.47 53,268,875.08 52,886,785.67 53,270,357.95 52,816,935.54 53,200,001.22 52,741,491.14 53,124,009.64 52,730,073.95 53,112,509.65 52,791,975.26 53,174,859.91 52,868,752.73 53,252,194.23
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 74,616,000 75,157,000 74,817,885.03 75,360,348.78 74,921,028.10 75,464,239.69 74,923,113.72 75,466,340.43 74,824,159.14 75,366,668.39 74,717,279.34 75,259,013.66 74,701,104.95 75,242,722.00 74,788,798.68 75,331,051.54 74,897,567.00 75,440,608.49
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 121,534,000 143,646,000 121,862,828.87 144,034,656.27 122,030,827.56 144,233,220.79 122,034,224.59 144,237,235.88 121,873,048.11 144,046,734.81 121,698,963.05 143,840,976.56 121,672,618.33 143,809,838.67 121,815,453.23 143,978,661.07 121,992,614.28 144,188,054.96
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 187,538,000 188,369,000 188,045,412.81 188,878,661.21 188,304,650.05 189,139,047.15 188,309,891.98 189,144,312.31 188,061,182.02 188,894,500.29 187,792,552.96 188,624,680.91 187,751,900.67 188,583,848.49 187,972,307.90 188,805,232.36 188,245,683.49 189,079,819.31
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 231,430,000 240,121,000 232,056,169.34 240,770,684.17 232,376,079.30 241,102,607.86 232,382,548.07 241,109,319.56 232,075,629.23 240,790,874.85 231,744,129.36 240,446,926.01 231,693,962.68 240,394,875.39 231,965,954.72 240,677,081.68 232,303,312.03 241,027,107.92
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 279,153,000 289,706,000 279,908,291.23 290,489,843.99 280,294,169.58 290,890,309.94 280,301,972.27 290,898,407.61 279,931,763.94 290,514,204.05 279,531,905.73 290,099,229.75 279,471,394.22 290,036,430.68 279,799,473.53 290,376,912.58 280,206,397.02 290,799,219.26
124 Pelat Rambu (Eng. Grade) Buah 154,000 168,000 154,416.67 168,454.55 154,629.55 168,686.78 154,633.85 168,691.48 154,429.62 168,468.68 154,209.03 168,228.03 154,175.65 168,191.62 154,356.64 168,389.06 154,581.13 168,633.96
125 Pelat Rambu (High L Grade) Buah 190,000 196,000 190,514.07 196,530.31 190,776.71 196,801.24 190,782.03 196,806.72 190,530.05 196,546.79 190,257.89 196,266.04 190,216.71 196,223.55 190,440.01 196,453.90 190,716.97 196,739.62
126 Pemantul Cahaya (Reflector) Buah 11,000 12,000 11,029.76 12,032.47 11,044.97 12,049.06 11,045.28 12,049.39 11,030.69 12,033.48 11,014.93 12,016.29 11,012.55 12,013.69 11,025.47 12,027.79 11,041.51 12,045.28
127 Pipa Baja D10" Kg 12,000 18,000 12,032.47 18,048.70 12,049.06 18,073.58 12,049.39 18,074.09 12,033.48 18,050.22 12,016.29 18,024.43 12,013.69 18,020.53 12,027.79 18,041.69 12,045.28 18,067.92
128 Pipa Drainase Baja Dia 3" M' 217,000 220,000 217,587.13 220,595.24 217,887.09 220,899.35 217,893.16 220,905.50 217,605.37 220,613.74 217,294.54 220,298.61 217,247.50 220,250.93 217,502.54 220,509.48 217,818.86 220,830.18
129 Pipa Galvanis Dia 1,5" M' 83,000 87,000 83,224.57 87,235.39 83,339.30 87,355.65 83,341.62 87,358.09 83,231.55 87,242.71 83,112.66 87,118.09 83,094.67 87,099.23 83,192.21 87,201.48 83,313.20 87,328.30
130 Pipa Galvanis Dia 2" M' 113,000 251,000 113,305.74 251,679.12 113,461.94 252,026.08 113,465.10 252,033.10 113,315.24 251,700.22 113,153.38 251,340.69 113,128.88 251,286.28 113,261.69 251,581.28 113,426.41 251,947.16
131 Pipa Galvanis Dia 3" M' 104,738 193,000 105,021.38 193,522.19 105,166.17 193,788.98 105,169.09 193,794.37 105,030.19 193,538.42 104,880.17 193,261.97 104,857.46 193,220.13 104,980.56 193,446.96 105,133.23 193,728.29
132 Pipa Porus M' 35,000 36,000 35,094.70 36,097.40 35,143.08 36,147.17 35,144.06 36,148.17 35,097.64 36,100.43 35,047.51 36,048.86 35,039.92 36,041.06 35,081.05 36,083.37 35,132.07 36,135.85
133 Pipa PVC Dia 4" M' 50,000 150,000 50,135.28 150,405.85 50,204.40 150,613.20 50,205.80 150,617.39 50,139.49 150,418.46 50,067.87 150,203.60 50,057.03 150,171.09 50,115.79 150,347.38 50,188.68 150,566.03
134 Plastik Filter M2 24,000 29,000 24,064.94 29,078.46 24,098.11 29,118.55 24,098.78 29,119.36 24,066.95 29,080.90 24,032.58 29,039.36 24,027.37 29,033.08 24,055.58 29,067.16 24,090.57 29,109.43
135 Rel Pengaman M' 120,000 136,000 120,324.68 136,367.97 120,490.56 136,555.96 120,493.91 136,559.77 120,334.77 136,379.40 120,162.88 136,184.60 120,136.87 136,155.12 120,277.90 136,314.95 120,452.83 136,513.20
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,594,000 1,639,000 1,598,312.81 1,643,434.57 1,600,516.23 1,645,700.19 1,600,560.78 1,645,746.00 1,598,446.84 1,643,572.38 1,596,163.60 1,641,224.68 1,595,818.07 1,640,869.40 1,597,691.45 1,642,795.66 1,600,015.03 1,645,184.84
137 Strip Bearing Buah 247,000 251,000 247,668.30 251,679.12 248,009.73 252,026.08 248,016.63 252,033.10 247,689.07 251,700.22 247,335.26 251,340.69 247,281.72 251,286.28 247,572.01 251,581.28 247,932.07 251,947.16
138 Tiang Pancang Baja Diameter 400 M' 551,000 581,000 552,490.81 582,571.98 553,252.47 583,375.11 553,267.87 583,391.35 552,537.15 582,620.84 551,747.89 581,788.61 551,628.46 581,662.67 552,276.03 582,345.50 553,079.22 583,192.43
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 638,000 710,000 639,726.21 711,921.01 640,608.13 712,902.46 640,625.96 712,922.31 639,779.85 711,980.71 638,865.98 710,963.71 638,727.69 710,809.81 639,477.51 711,644.25 640,407.52 712,679.22
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,436,000 1,484,000 1,439,885.32 1,488,015.19 1,441,870.33 1,490,066.55 1,441,910.47 1,490,108.03 1,440,006.06 1,488,139.97 1,437,949.14 1,486,014.29 1,437,637.86 1,485,692.61 1,439,325.55 1,487,436.71 1,441,418.81 1,489,599.94
HARGA SATUAN DASAR UPAH KABUPATEN BANYUWANGI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 78,445.38 96,399.85 78,366.10 96,302.43 78,252.10 96,162.34 78,209.09 96,109.48 78,275.34 96,190.89 78,387.70 96,328.97 78,441.77 96,395.42 78,322.19 96,248.46
2 Tukang OH 98,689.35 108,449.84 98,589.61 108,340.23 98,446.19 108,182.63 98,392.08 108,123.17 98,475.42 108,214.75 98,616.79 108,370.09 98,684.81 108,444.84 98,534.37 108,279.52
3 Mandor OH 111,341.83 124,516.48 111,229.30 124,390.64 111,067.50 124,209.69 111,006.45 124,141.42 111,100.48 124,246.57 111,259.96 124,424.92 111,336.71 124,510.75 111,166.98 124,320.93
4 Operator OH 200,833.03 256,062.11 200,630.06 255,803.32 200,338.20 255,431.21 200,228.09 255,290.82 200,397.69 255,507.05 200,685.36 255,873.83 200,823.79 256,050.33 200,517.64 255,659.98
5 Pembantu Operator OH 120,499.82 160,666.42 120,378.03 160,504.05 120,202.92 160,270.56 120,136.85 160,182.47 120,238.61 160,318.15 120,411.22 160,548.29 120,494.27 160,659.03 120,310.58 160,414.11
6 Sopir OH 96,399.85 120,499.82 96,302.43 120,378.03 96,162.34 120,202.92 96,109.48 120,136.85 96,190.89 120,238.61 96,328.97 120,411.22 96,395.42 120,494.27 96,248.46 120,310.58
7 Pembantu Sopir OH 80,333.21 104,433.18 80,252.02 104,327.63 80,135.28 104,175.87 80,091.24 104,118.61 80,159.07 104,206.80 80,274.14 104,356.39 80,329.51 104,428.37 80,207.05 104,269.17
8 Mekanik OH 108,449.84 144,599.78 108,340.23 144,453.64 108,182.63 144,243.51 108,123.17 144,164.23 108,214.75 144,286.33 108,370.09 144,493.46 108,444.84 144,593.13 108,279.52 144,372.70
9 Pembantu Mekanik OH 100,416.52 104,433.18 100,315.03 104,327.63 100,169.10 104,175.87 100,114.05 104,118.61 100,198.84 104,206.80 100,342.68 104,356.39 100,411.89 104,428.37 100,258.82 104,269.17
10 Kepala Tukang OH 108,449.84 120,499.82 108,340.23 120,378.03 108,182.63 120,202.92 108,123.17 120,136.85 108,214.75 120,238.61 108,370.09 120,411.22 108,444.84 120,494.27 108,279.52 120,310.58
11 Pemasak Aspal OH 88,366.53 120,499.82 88,277.22 120,378.03 88,148.81 120,202.92 88,100.36 120,136.85 88,174.98 120,238.61 88,301.56 120,411.22 88,362.47 120,494.27 88,227.76 120,310.58

HARGA SATUAN DASAR ALAT KABUPATEN BANYUWANGI TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 377,439.87 421,749.36 377,058.41 421,323.12 376,509.91 420,710.23 376,302.96 420,478.99 376,621.70 420,835.14 377,162.34 421,439.26 377,422.49 421,729.95 376,847.13 766,523.92
2 Asphalt Distribution Unit/Jam 232,393.97 299,241.21 232,159.10 298,938.78 231,821.39 298,503.93 231,693.97 298,339.86 231,890.22 298,592.55 232,223.10 299,021.19 232,383.28 299,227.44 232,029.02 511,460.65
3 Asphalt Finisher Unit/Jam 136,566.46 809,357.11 136,428.44 808,539.13 136,229.98 807,362.97 136,155.10 806,919.21 136,270.43 807,602.68 136,466.05 808,762.00 136,560.17 809,319.85 136,351.99 933,073.11
4 Asphalt Liquid Mixer Unit/Jam 60,903.25 111,462.33 60,841.70 111,349.68 60,753.19 111,187.70 60,719.80 111,126.59 60,771.23 111,220.72 60,858.47 111,380.38 60,900.45 111,457.20 60,807.60 167,026.57
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 27,112.46 81,738.57 27,085.06 81,655.96 27,045.66 81,537.18 27,030.79 81,492.36 27,053.69 81,561.39 27,092.52 81,678.47 27,111.21 81,734.81 27,069.88 106,423.81
6 Asphalt Mixing Plant Unit/Jam 913,548.73 5,898,918.97 912,625.44 5,892,957.18 911,297.87 5,884,384.84 910,796.98 5,881,150.55 911,568.44 5,886,131.96 912,877.01 5,894,581.58 913,506.68 5,898,647.43 912,114.06 6,725,744.39
7 Asphalt Sprayer Unit/Jam 48,199.93 93,123.26 48,151.21 93,029.15 48,081.17 92,893.82 48,054.74 92,842.76 48,095.44 92,921.40 48,164.49 93,054.79 48,197.71 93,118.98 48,124.23 137,090.09
8 Asphalt Tanker Unit/Jam 352,597.75 408,695.22 352,241.40 408,282.17 351,729.00 407,688.25 351,535.68 407,464.17 351,833.43 407,809.29 352,338.49 408,394.71 352,581.52 408,676.40 352,044.02 730,754.51
9 Blending Equipment Unit/Jam 114,594.27 180,749.73 114,478.45 180,567.05 114,311.93 180,304.38 114,249.10 180,205.28 114,345.87 180,357.92 114,510.01 180,616.82 114,589.00 180,741.41 114,414.31 285,343.74
10 Bore Pile Machine Unit/Jam 305,765.28 549,278.34 305,456.25 548,723.20 305,011.91 547,924.99 304,844.27 547,623.83 305,102.47 548,087.67 305,540.45 548,874.46 305,751.20 549,253.05 305,285.09 828,255.29
11 Bore Pile Machine Dia 60 Unit/Jam 206,750.50 624,590.72 206,541.55 623,959.48 206,241.10 623,051.82 206,127.74 622,709.36 206,302.33 623,236.81 206,598.48 624,131.47 206,740.98 624,561.97 206,425.81 812,830.05
12 Bore Pile Machine Dia 80 Unit/Jam 817,385.70 817,385.70 816,559.61 816,559.61 815,371.78 815,371.78 814,923.62 814,923.62 815,613.87 815,613.87 816,784.69 816,784.69 817,348.08 817,348.08 816,102.05 1,564,181.93
13 Bulldozer 100-150 HP Unit/Jam 310,287.03 502,272.36 309,973.44 501,764.74 309,522.53 501,034.83 309,352.40 500,759.44 309,614.43 501,183.59 310,058.88 501,903.05 310,272.75 502,249.24 309,799.75 785,461.49
14 Cement Tanker Unit/Jam 298,105.37 384,595.25 297,804.09 384,206.56 297,370.88 383,647.66 297,207.44 383,436.79 297,459.18 383,761.57 297,886.18 384,312.47 298,091.65 384,577.55 297,637.22 656,820.40
15 Cold Milling Unit/Jam 249,032.96 1,410,403.18 248,781.27 1,408,977.74 248,419.37 1,406,928.13 248,282.83 1,406,154.83 248,493.13 1,407,345.86 248,849.85 1,409,366.13 249,021.49 1,410,338.25 248,641.87 1,636,105.78
16 Cold Recycler Unit/Jam 3,921,047.31 3,921,047.31 3,917,084.47 3,917,084.47 3,911,386.38 3,911,386.38 3,909,236.53 3,909,236.53 3,912,547.70 3,912,547.70 3,918,164.22 3,918,164.22 3,920,866.81 3,920,866.81 3,914,889.56 7,503,472.74
17 Compressor 4000-6500 L\M Unit/Jam 101,420.68 166,717.52 101,318.18 166,549.03 101,170.79 166,306.75 101,115.19 166,215.35 101,200.83 166,356.13 101,346.11 166,594.94 101,416.01 166,709.85 101,261.41 259,276.96
18 Concrete Breaker Unit/Jam 435,137.68 829,440.41 434,697.91 828,602.13 434,065.56 827,396.79 433,826.98 826,942.02 434,194.44 827,642.45 434,817.73 828,830.54 435,117.65 829,402.23 434,454.33 1,226,380.36
19 Concrete Mixer (350) Unit/Jam 33,137.45 80,937.21 33,103.96 80,855.41 33,055.80 80,737.79 33,037.64 80,693.42 33,065.62 80,761.77 33,113.08 80,877.70 33,135.92 80,933.49 33,085.41 111,137.84
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 64,763.63 92,156.23 64,698.18 92,063.09 64,604.06 91,929.17 64,568.55 91,878.64 64,623.24 91,956.47 64,716.01 92,088.47 64,760.65 92,151.99 64,661.92 151,283.85
21 Concrete Pan Mixer Unit/Jam 245,215.71 525,178.37 244,967.88 524,647.60 244,611.53 523,884.41 244,477.09 523,596.46 244,684.16 524,039.95 245,035.41 524,792.22 245,204.42 525,154.20 244,830.62 748,777.58
22 Concrete Pump Unit/Jam 186,716.54 251,605.63 186,527.83 251,351.34 186,256.49 250,985.71 186,154.12 250,847.75 186,311.80 251,060.23 186,579.25 251,420.63 186,707.94 251,594.05 186,423.31 422,095.41
23 Concrete Vibrator Unit/Jam 29,120.79 69,718.19 29,091.36 69,647.73 29,049.04 69,546.42 29,033.07 69,508.19 29,057.66 69,567.07 29,099.38 69,666.93 29,119.45 69,714.98 29,075.06 96,260.35
24 Crane 10-15 Ton Unit/Jam 229,953.82 394,875.90 229,721.41 394,476.81 229,387.24 393,902.98 229,261.16 393,686.47 229,455.35 394,019.93 229,784.74 394,585.55 229,943.23 394,857.72 229,592.69 604,711.89
25 Crane On Track 35 Ton Unit/Jam 207,551.86 457,368.11 207,342.10 456,905.86 207,040.48 456,241.21 206,926.68 455,990.44 207,101.95 456,376.67 207,399.25 457,031.81 207,542.31 457,347.05 207,225.91 646,603.46
26 Crane On Track 75-100 Ton Unit/Jam 326,152.92 494,049.25 325,823.29 493,549.94 325,349.33 492,831.98 325,170.50 492,561.10 325,445.93 492,978.31 325,913.11 493,685.99 326,137.91 494,026.51 325,640.72 791,771.92
27 Dump Truck 10 Ton Unit/Jam 288,195.40 363,819.08 287,904.13 363,451.38 287,485.32 362,922.68 287,327.31 362,723.20 287,570.68 363,030.43 287,983.49 363,551.56 288,182.13 363,802.33 287,742.81 627,007.14
28 Dump Truck 3-4 M3 Unit/Jam 137,570.63 270,550.21 137,431.59 270,276.77 137,231.67 269,883.61 137,156.24 269,735.27 137,272.42 269,963.74 137,469.47 270,351.28 137,564.29 270,537.75 137,354.58 396,031.39
29 Excavator 80-140 HP Unit/Jam 133,553.97 464,872.23 133,418.99 464,402.40 133,224.91 463,726.85 133,151.68 463,471.97 133,264.46 463,864.53 133,455.76 464,530.42 133,547.82 464,850.83 133,344.23 586,372.16
30 Flat Bed Truck 3-4 M3 Unit/Jam 128,533.14 394,636.90 128,403.24 394,238.06 128,216.45 393,664.57 128,145.98 393,448.20 128,254.52 393,781.45 128,438.63 394,346.73 128,527.22 394,618.74 128,331.29 511,652.02
31 Fulvi Mixer Unit/Jam 740,455.29 1,156,798.25 739,706.94 1,155,629.13 738,630.90 1,153,948.06 738,224.92 1,153,313.81 738,850.21 1,154,290.68 739,910.84 1,155,947.68 740,421.20 1,156,745.00 739,292.45 1,832,653.94
32 Generator Set Unit/Jam 329,358.36 554,328.28 329,025.49 553,768.05 328,546.86 552,962.49 328,366.28 552,658.56 328,644.41 553,126.67 329,116.18 553,920.69 329,343.20 554,302.77 328,841.12 854,889.93
33 Hot Recycler Unit/Jam 2,419,301.41 7,094,426.79 2,416,856.33 7,087,256.75 2,413,340.58 7,076,947.09 2,412,014.12 7,073,057.32 2,414,057.12 7,079,048.29 2,417,522.54 7,089,210.36 2,419,190.05 7,094,100.22 2,415,502.06 9,297,455.22
34 Jack Hammer Unit/Jam 24,099.96 45,677.44 24,075.61 45,631.27 24,040.58 45,564.89 24,027.37 45,539.85 24,047.72 45,578.42 24,082.24 45,643.85 24,098.85 45,675.33 24,062.12 67,662.24
35 Launching Gantry Unit/Jam 58,129,746.68 58,129,746.68 58,070,997.38 58,070,997.38 57,986,522.90 57,986,522.90 57,954,651.24 57,954,651.24 58,003,739.55 58,003,739.55 58,087,004.71 58,087,004.71 58,127,070.82 58,127,070.82 58,038,457.79 111,239,405.08
36 Motor Grader > 100 HP Unit/Jam 228,387.18 538,236.54 228,156.36 537,692.56 227,824.47 536,910.40 227,699.25 536,615.29 227,892.11 537,069.81 228,219.25 537,840.78 228,376.67 538,211.76 228,028.52 746,413.59
37 Pedestrian Roller Unit/Jam 22,091.63 77,651.09 22,069.31 77,572.61 22,037.20 77,459.77 22,025.09 77,417.19 22,043.75 77,482.76 22,075.39 77,593.99 22,090.62 77,647.51 22,056.94 97,747.63
38 Pile Driver + Hammer Unit/Jam 85,745.36 269,260.86 85,658.70 268,988.73 85,534.10 268,597.44 85,487.09 268,449.81 85,559.49 268,677.19 85,682.32 269,062.88 85,741.42 269,248.47 85,610.71 347,313.05
39 Rock Drill Breaker Unit/Jam 83,341.29 271,124.59 83,257.06 270,850.58 83,135.95 270,456.58 83,090.25 270,307.92 83,160.63 270,536.88 83,280.01 270,925.24 83,337.45 271,112.11 83,210.41 346,973.62
40 Split Form Paver Unit/Jam 176,298.88 176,298.88 176,120.70 176,120.70 175,864.50 175,864.50 175,767.84 175,767.84 175,916.72 175,916.72 176,169.25 176,169.25 176,290.76 176,290.76 176,022.01 337,372.57
41 Stone Crusher Unit/Jam 363,507.78 738,363.64 363,140.40 737,617.41 362,612.15 736,544.41 362,412.85 736,139.58 362,719.81 736,763.10 363,240.50 737,820.73 363,491.05 738,329.65 362,936.92 1,069,890.18
42 Tamper Unit/Jam 34,141.62 70,519.55 34,107.11 70,448.28 34,057.49 70,345.80 34,038.78 70,307.14 34,067.61 70,366.69 34,116.51 70,467.70 34,140.04 70,516.30 34,088.00 101,655.57
43 Tandem Roller 6-8 T Unit/Jam 113,470.66 397,649.40 113,355.98 397,247.51 113,191.09 396,669.65 113,128.87 396,451.62 113,224.69 396,787.42 113,387.23 397,357.01 113,465.44 397,631.09 113,292.46 500,874.45
44 Three Wheel Roller 6-8 T Unit/Jam 112,991.55 199,256.49 112,877.36 199,055.11 112,713.16 198,765.55 112,651.21 198,656.30 112,746.62 198,824.57 112,908.47 199,109.98 112,986.35 199,247.32 112,814.11 302,354.61
45 Tire Roller 8-10 T Unit/Jam 108,449.84 364,511.95 108,340.23 364,143.55 108,182.63 363,613.84 108,123.17 363,413.99 108,214.75 363,721.80 108,370.09 364,243.93 108,444.84 364,495.17 108,279.52 463,193.92
46 Track Loader 75-100 HP Unit/Jam 189,120.61 431,112.20 188,929.48 430,676.49 188,654.65 430,050.00 188,550.95 429,813.63 188,710.66 430,177.68 188,981.56 430,795.21 189,111.91 431,092.35 188,823.61 603,520.31
47 Trailer 20 Ton Unit/Jam 305,317.60 465,909.53 305,009.03 465,438.66 304,565.34 464,761.60 304,397.94 464,506.15 304,655.77 464,899.59 305,093.11 465,566.96 305,303.55 465,888.09 304,838.12 744,607.69
48 Trailler 15 Ton Unit/Jam 264,448.32 402,670.23 264,181.05 402,263.26 263,796.75 401,678.10 263,651.76 401,457.32 263,875.07 401,797.36 264,253.87 402,374.15 264,436.14 402,651.69 264,033.02 644,063.70
49 Truck Mixer (agitator) Unit/Jam 332,563.79 489,028.43 332,227.68 488,534.19 331,744.40 487,823.53 331,562.06 487,555.40 331,842.90 487,968.37 332,319.26 488,668.85 332,548.48 489,005.92 332,041.52 792,626.27
50 Vibrating Rammer Unit/Jam 29,120.79 68,115.48 29,091.36 68,046.63 29,049.04 67,947.65 29,033.07 67,910.30 29,057.66 67,967.82 29,099.38 68,065.39 29,119.45 68,112.34 29,075.06 94,660.15
51 Vibratory Roller 5-8 T Unit/Jam 143,595.62 352,461.97 143,450.49 352,105.75 143,241.82 351,593.55 143,163.09 351,400.30 143,284.35 351,697.94 143,490.03 352,202.81 143,589.01 352,445.74 143,370.11 483,328.65
52 Water Pump 70-100 MM Unit/Jam 22,091.63 53,819.24 22,069.31 53,764.84 22,037.20 53,686.63 22,025.09 53,657.12 22,043.75 53,702.57 22,075.39 53,779.66 22,090.62 53,816.76 22,056.94 73,953.21
53 Water Tanker 3000-4500 L Unit/Jam 154,641.43 237,009.08 154,485.14 236,769.55 154,260.42 236,425.13 154,175.63 236,295.18 154,306.22 236,495.32 154,527.73 236,834.81 154,634.31 236,998.17 154,398.58 378,166.32
54 Welding Set Unit/Jam 65,270.73 104,176.61 65,204.77 104,071.32 65,109.92 103,919.93 65,074.13 103,862.81 65,129.25 103,950.79 65,222.74 104,100.01 65,267.73 104,171.81 65,168.23 163,749.46
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 168,699.75 443,017.58 168,529.25 442,569.84 168,284.09 441,926.05 168,191.60 441,683.15 168,334.06 442,057.26 168,575.70 442,691.84 168,691.98 442,997.19 168,434.81 596,717.61
HARGA SATUAN DASAR BAHAN KABUPATEN BANYUWANGI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 252,045.45 252,045.45 251,790.72 251,790.72 251,424.45 251,424.45 251,286.25 251,286.25 251,499.10 251,499.10 251,860.13 251,860.13 252,033.85 252,033.85 251,649.63 482,324.25
2 Agregat Pecah Mesin 20-30 mm M3 239,995.47 321,583.89 239,752.92 321,258.88 239,404.15 320,791.55 239,272.57 320,615.23 239,475.24 320,886.80 239,819.01 321,347.43 239,984.42 321,569.09 239,618.57 540,725.21
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 252,045.45 326,855.76 251,790.72 326,525.42 251,424.45 326,050.43 251,286.25 325,871.22 251,499.10 326,147.24 251,860.13 326,615.42 252,033.85 326,840.71 251,649.63 557,017.07
4 Bahan Agr. Base Kelas A M3 264,095.43 264,542.29 263,828.52 264,274.93 263,444.74 263,890.49 263,299.94 263,745.45 263,522.96 263,968.84 263,901.25 264,347.77 264,083.28 264,530.11 263,680.69 505,829.72
5 Bahan Agr. Base Kelas B M3 248,028.79 248,515.81 247,778.12 248,264.65 247,417.68 247,903.50 247,281.69 247,767.25 247,491.14 247,977.11 247,846.42 248,333.08 248,017.37 248,504.37 247,639.28 475,124.06
6 Bahan Agr. Base Kelas C M3 227,945.49 227,945.49 227,715.11 227,715.11 227,383.86 227,383.86 227,258.88 227,258.88 227,451.37 227,451.37 227,777.88 227,777.88 227,935.00 227,935.00 227,587.52 436,205.59
7 Bahan Agr. Base Kelas C2 M3 207,862.19 207,862.19 207,652.11 207,652.11 207,350.04 207,350.04 207,236.07 207,236.07 207,411.61 207,411.61 207,709.35 207,709.35 207,852.62 207,852.62 207,535.75 397,773.38
8 Bahan Agr. Base Kelas S M3 168,699.75 168,699.75 168,529.25 168,529.25 168,284.09 168,284.09 168,191.60 168,191.60 168,334.06 168,334.06 168,575.70 168,575.70 168,691.98 168,691.98 168,434.81 322,830.57
9 Bahan Pilihan M3 107,445.67 199,883.09 107,337.08 199,681.08 107,180.94 199,390.61 107,122.03 199,281.01 107,212.76 199,449.81 107,366.67 199,736.12 107,440.73 199,873.89 107,276.93 297,904.58
10 Bahan Tanah Timbunan M3 96,399.85 161,319.13 96,302.43 161,156.09 96,162.34 160,921.66 96,109.48 160,833.21 96,190.89 160,969.44 96,328.97 161,200.52 96,395.42 161,311.71 96,248.46 249,291.94
11 Batu Belah/Kerakal M3 120,499.82 271,124.59 120,378.03 270,850.58 120,202.92 270,456.58 120,136.85 270,307.92 120,238.61 270,536.88 120,411.22 270,925.24 120,494.27 271,112.11 120,310.58 380,981.49
12 Batu Kali M3 136,566.46 299,241.21 136,428.44 298,938.78 136,229.98 298,503.93 136,155.10 298,339.86 136,270.43 298,592.55 136,466.05 299,021.19 136,560.17 299,227.44 136,351.99 423,758.32
13 Chipping M3 178,741.40 178,741.40 178,560.75 178,560.75 178,301.00 178,301.00 178,203.00 178,203.00 178,353.94 178,353.94 178,609.97 178,609.97 178,733.17 178,733.17 178,460.70 342,046.68
14 Chipping (kg) Kg 240.00 240.00 239.75 239.75 239.40 239.40 239.27 239.27 239.48 239.48 239.82 239.82 239.98 239.98 239.62 459.26
15 Filler Cement Kg 1,004.17 2,008.33 1,003.15 2,006.30 1,001.69 2,003.38 1,001.14 2,002.28 1,001.99 2,003.98 1,003.43 2,006.85 1,004.12 2,008.24 1,002.59 2,924.20
16 Gebalan Rumput M' 5,020.83 5,020.83 5,015.75 5,015.75 5,008.46 5,008.46 5,005.70 5,005.70 5,009.94 5,009.94 5,017.13 5,017.13 5,020.59 5,020.59 5,012.94 9,608.05
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 235,978.81 239,995.47 235,740.32 239,752.92 235,397.39 239,404.15 235,268.01 239,272.57 235,467.28 239,475.24 235,805.30 239,819.01 235,967.95 239,984.42 235,608.22 455,588.83
18 Kapur M3 80,333.21 80,333.21 80,252.02 80,252.02 80,135.28 80,135.28 80,091.24 80,091.24 80,159.07 80,159.07 80,274.14 80,274.14 80,329.51 80,329.51 80,207.05 153,728.84
19 Pasir Beton (Kasar) M3 200,833.03 380,578.59 200,630.06 380,193.96 200,338.20 379,640.90 200,228.09 379,432.23 200,397.69 379,753.62 200,685.36 380,298.76 200,823.79 380,561.07 200,517.64 563,785.39
20 Pasir Halus (untuk HRS) M3 184,766.39 239,995.47 184,579.65 239,752.92 184,311.15 239,404.15 184,209.84 239,272.57 184,365.87 239,475.24 184,630.53 239,819.01 184,757.88 239,984.42 184,476.22 408,718.69
21 Pasir Pasang (Sedang) M3 124,516.48 212,883.01 124,390.64 212,667.86 124,209.69 212,358.50 124,141.42 212,241.78 124,246.57 212,421.55 124,424.92 212,726.48 124,510.75 212,873.21 124,320.93 326,507.47
22 Pasir Urug M3 113,470.66 140,583.12 113,355.98 140,441.04 113,191.09 140,236.74 113,128.87 140,159.66 113,224.69 140,278.38 113,387.23 140,479.75 113,465.44 140,576.65 113,292.46 244,211.87
23 Pasir Urug (ada unsur lempung) M3 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 245,966.15
24 Sirtu M3 89,370.70 124,516.48 89,280.38 124,390.64 89,150.50 124,209.69 89,101.50 124,141.42 89,176.97 124,246.57 89,304.99 124,424.92 89,366.58 124,510.75 89,230.35 206,113.92
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 36,149.95 56,233.25 36,113.41 56,176.42 36,060.88 56,094.70 36,041.06 56,063.87 36,071.58 56,111.35 36,123.36 56,191.90 36,148.28 56,230.66 36,093.17 89,229.74
26 Anti Pengelupas Liter 80,333.21 80,333.21 80,252.02 80,252.02 80,135.28 80,135.28 80,091.24 80,091.24 80,159.07 80,159.07 80,274.14 80,274.14 80,329.51 80,329.51 80,207.05 153,728.84
27 Arbocell Kg 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 217,141.99
28 Asbuton Curah Kg 10,041.65 12,049.98 10,031.50 12,037.80 10,016.91 12,020.29 10,011.40 12,013.69 10,019.88 12,023.86 10,034.27 12,041.12 10,041.19 12,049.43 10,025.88 21,221.28
29 Aspal Emulsi (CRS-1/53 R-65) Kg 7,029.16 12,757.92 7,022.05 12,745.02 7,011.84 12,726.48 7,007.98 12,719.49 7,013.92 12,730.26 7,023.99 12,748.54 7,028.83 12,757.33 7,018.12 19,171.04
30 Aspal Emulsi (CSS-1) Kg 7,029.16 12,757.92 7,022.05 12,745.02 7,011.84 12,726.48 7,007.98 12,719.49 7,013.92 12,730.26 7,023.99 12,748.54 7,028.83 12,757.33 7,018.12 19,171.04
31 Aspal Minyak (Drum) Kg 8,033.32 9,513.46 8,025.20 9,503.85 8,013.53 9,490.02 8,009.12 9,484.80 8,015.91 9,492.84 8,027.41 9,506.47 8,032.95 9,513.02 8,020.71 16,850.70
32 Aspal Modifikasi (BNA) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
33 Aspal Modifikasi (JAP-57) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
34 Aspal Modifikasi (Retona) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
35 Aspal Modifikasi (Starbit) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
36 Aspal Minyak (Curah) Kg 6,024.99 8,033.32 6,018.90 8,025.20 6,010.15 8,013.53 6,006.84 8,009.12 6,011.93 8,015.91 6,020.56 8,027.41 6,024.71 8,032.95 6,015.53 13,534.84
37 Assetilline Botol 92,383.19 124,516.48 92,289.83 124,390.64 92,155.57 124,209.69 92,104.92 124,141.42 92,182.94 124,246.57 92,315.27 124,424.92 92,378.94 124,510.75 92,238.11 208,870.99
38 Bahan Pengawet: Kreosot Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
39 Bensin Liter 6,024.99 8,033.32 6,018.90 8,025.20 6,010.15 8,013.53 6,006.84 8,009.12 6,011.93 8,015.91 6,020.56 8,027.41 6,024.71 8,032.95 6,015.53 13,534.84
40 Beton B-0 M3 432,795.18 472,801.53 432,357.77 472,323.69 431,728.83 471,636.62 431,491.54 471,377.39 431,857.02 471,776.65 432,476.95 472,453.89 432,775.26 472,779.77 432,115.50 868,157.67
41 Beton K-125 (fc' 10 MPa) M3 440,828.50 488,828.71 440,382.97 488,334.67 439,742.36 487,624.30 439,500.66 487,356.28 439,872.92 487,769.08 440,504.37 488,469.28 440,808.21 488,806.20 440,136.21 891,511.85
42 Beton K-175 (fc' 15 MPa) M3 501,078.41 528,896.63 500,571.99 528,362.10 499,843.82 527,593.50 499,569.09 527,303.52 499,992.23 527,750.15 500,709.97 528,507.74 501,055.34 528,872.29 500,291.50 986,658.20
43 Beton K-250 (fc' 20 MPa) M3 540,240.85 588,998.52 539,694.85 588,403.25 538,909.77 587,547.31 538,613.57 587,224.37 539,069.78 587,721.76 539,843.62 588,565.44 540,215.98 588,971.41 539,392.44 1,082,507.57
44 Beton K-300 (fc' 25 MPa) M3 600,490.76 613,039.28 599,883.87 612,419.71 599,011.23 611,528.83 598,681.99 611,192.71 599,189.08 611,710.40 600,049.23 612,588.52 600,463.12 613,011.06 599,547.73 1,161,651.92
45 Beton K-350 (fc' 30 MPa) M3 630,615.71 637,080.03 629,978.38 636,436.16 629,061.96 635,510.36 628,716.21 635,161.05 629,248.74 635,699.04 630,152.03 636,611.60 630,586.69 637,050.71 629,625.37 1,213,225.59
46 Beton K-400 (fc' 35 MPa) M3 661,120.79 661,120.79 660,452.62 660,452.62 659,491.88 659,491.88 659,129.40 659,129.40 659,687.69 659,687.69 660,634.68 660,634.68 661,090.36 661,090.36 660,082.54 1,265,147.15
47 Beton K-450 (fc' 40 MPa) M3 693,175.13 693,175.13 692,474.57 692,474.57 691,467.24 691,467.24 691,087.19 691,087.19 691,672.54 691,672.54 692,665.45 692,665.45 693,143.22 693,143.22 692,086.55 1,326,487.62
48 Beton K-500 (fc' 45 MPa) M3 721,222.68 721,222.68 720,493.77 720,493.77 719,445.69 719,445.69 719,050.25 719,050.25 719,659.29 719,659.29 720,692.38 720,692.38 721,189.48 721,189.48 720,090.05 1,380,160.53
49 Bunker Oil Liter 3,012.50 3,012.50 3,009.45 3,009.45 3,005.07 3,005.07 3,003.42 3,003.42 3,005.97 3,005.97 3,010.28 3,010.28 3,012.36 3,012.36 3,007.76 5,764.83
50 Cat Kg 46,191.60 73,304.06 46,144.91 73,229.97 46,077.79 73,123.44 46,052.46 73,083.25 46,091.47 73,145.16 46,157.63 73,250.16 46,189.47 73,300.68 46,119.06 115,463.97
51 Cat Anti Karat Kg 24,099.96 58,241.58 24,075.61 58,182.72 24,040.58 58,098.08 24,027.37 58,066.15 24,047.72 58,115.33 24,082.24 58,198.75 24,098.85 58,238.90 24,062.12 80,206.65
52 Cat Marka (Non Thermoplas) Kg 52,216.59 52,216.59 52,163.81 52,163.81 52,087.93 52,087.93 52,059.30 52,059.30 52,103.40 52,103.40 52,178.19 52,178.19 52,214.18 52,214.18 52,134.59 99,923.75
53 Cat Marka (Thermoplastic) Kg 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
54 Cerucuk Diameter 10-15 cm M' 18,074.97 20,083.30 18,056.71 20,063.01 18,030.44 20,033.82 18,020.53 20,022.81 18,035.79 20,039.77 18,061.68 20,068.54 18,074.14 20,082.38 18,046.59 36,594.17
55 Cold Mix (Aspal Dingin) Kg 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,045,335.92 1,045,335.92 1,044,279.44 1,044,279.44 1,042,760.36 1,042,760.36 1,042,187.21 1,042,187.21 1,043,069.96 1,043,069.96 1,044,567.30 1,044,567.30 1,045,287.80 1,045,287.80 1,043,694.29 2,000,396.57
57 Curing Compound Liter 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 489,028.43 489,028.43 488,534.19 488,534.19 487,823.53 487,823.53 487,555.40 487,555.40 487,968.37 487,968.37 488,668.85 488,668.85 489,005.92 489,005.92 488,260.44 935,824.33
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 569,361.64 569,361.64 568,786.21 568,786.21 567,958.81 567,958.81 567,646.64 567,646.64 568,127.44 568,127.44 568,943.00 568,943.00 569,335.43 569,335.43 568,467.50 1,089,553.18
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 664,757.33 720,990.58 664,085.49 720,261.90 663,119.46 719,214.16 662,754.98 718,818.85 663,316.34 719,427.70 664,268.54 720,460.44 664,726.73 720,957.39 663,713.37 1,328,251.12
61 Kerosen/Minyak Tanah Liter 8,033.32 13,917.73 8,025.20 13,903.66 8,013.53 13,883.44 8,009.12 13,875.81 8,015.91 13,887.56 8,027.41 13,907.50 8,032.95 13,917.09 8,020.71 21,248.05
62 Minyak Fluks Liter 5,020.83 6,024.99 5,015.75 6,018.90 5,008.46 6,010.15 5,005.70 6,006.84 5,009.94 6,011.93 5,017.13 6,020.56 5,020.59 6,024.71 5,012.94 10,610.64
63 Minyak Pelumas/Olie Liter 21,087.47 52,666.45 21,066.16 52,613.23 21,035.51 52,536.69 21,023.95 52,507.81 21,041.76 52,552.29 21,071.96 52,627.73 21,086.50 52,664.03 21,054.35 71,883.21
64 Oxygen (Isi 6 M3) Botol 134,558.13 137,570.63 134,422.14 137,431.59 134,226.60 137,231.67 134,152.82 137,156.24 134,266.45 137,272.42 134,459.19 137,469.47 134,551.94 137,564.29 134,346.82 260,503.58
65 Polytene 125 Mikron Kg 20,083.30 21,087.47 20,063.01 21,066.16 20,033.82 21,035.51 20,022.81 21,023.95 20,039.77 21,041.76 20,068.54 21,071.96 20,082.38 21,086.50 20,051.76 39,434.80
66 Sand Sheet Ton 961,990.21 1,105,585.83 961,017.97 1,104,468.46 959,620.00 1,102,861.82 959,092.56 1,102,255.64 959,904.92 1,103,189.27 961,282.88 1,104,772.91 961,945.93 1,105,534.94 960,479.47 1,984,273.01
67 Seal Coat M2 78,324.88 88,366.53 78,245.72 88,277.22 78,131.90 88,148.81 78,088.96 88,100.36 78,155.10 88,174.98 78,267.29 88,301.56 78,321.28 88,362.47 78,201.88 159,911.50
68 Seal Guard Kg 23,095.80 29,120.79 23,072.46 29,091.36 23,038.89 29,049.04 23,026.23 29,033.07 23,045.73 29,057.66 23,078.82 29,099.38 23,094.74 29,119.45 23,059.53 50,212.57
69 Semen/PC (50 kg) Zak 53,220.75 63,262.40 53,166.97 63,198.47 53,089.62 63,106.53 53,060.44 63,071.85 53,105.39 63,125.27 53,181.62 63,215.89 53,218.30 63,259.49 53,137.17 111,871.24
70 Semen/PC (kg) Kg 1,004.17 2,811.66 1,003.15 2,808.82 1,001.69 2,804.73 1,001.14 2,803.19 1,001.99 2,805.57 1,003.43 2,809.60 1,004.12 2,811.53 1,002.59 3,726.27
71 Slurry Seal Ton 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
72 Solar Liter 8,033.32 9,615.89 8,025.20 9,606.17 8,013.53 9,592.19 8,009.12 9,586.92 8,015.91 9,595.04 8,027.41 9,608.82 8,032.95 9,615.44 8,020.71 16,952.96
73 Thinner Liter 14,058.31 25,104.13 14,044.10 25,078.76 14,023.67 25,042.28 14,015.97 25,028.51 14,027.84 25,049.71 14,047.98 25,085.67 14,057.66 25,102.97 14,036.23 37,931.02
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 13,054.15 14,058.31 13,040.95 14,044.10 13,021.98 14,023.67 13,014.83 14,015.97 13,025.85 14,027.84 13,044.55 14,047.98 13,053.55 14,057.66 13,033.65 25,983.53
75 Baja Prategang Kg 12,049.98 16,066.64 12,037.80 16,050.40 12,020.29 16,027.06 12,013.69 16,018.25 12,023.86 16,031.81 12,041.12 16,054.83 12,049.43 16,065.90 12,031.06 27,069.68
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 7,029.16 13,054.15 7,022.05 13,040.95 7,011.84 13,021.98 7,007.98 13,014.83 7,013.92 13,025.85 7,023.99 13,044.55 7,028.83 13,053.55 7,018.12 19,466.80
77 Baja Tulangan (Polos) U25 Kg 9,037.49 14,576.46 9,028.35 14,561.73 9,015.22 14,540.55 9,010.26 14,532.55 9,017.90 14,544.86 9,030.84 14,565.74 9,037.07 14,575.79 9,023.29 22,824.77
78 Baja Tulangan (Polos) U32 Kg 9,037.49 14,576.46 9,028.35 14,561.73 9,015.22 14,540.55 9,010.26 14,532.55 9,017.90 14,544.86 9,030.84 14,565.74 9,037.07 14,575.79 9,023.29 22,824.77
79 Baja Tulangan (Polos) U36 Kg 9,037.49 14,576.46 9,028.35 14,561.73 9,015.22 14,540.55 9,010.26 14,532.55 9,017.90 14,544.86 9,030.84 14,565.74 9,037.07 14,575.79 9,023.29 22,824.77
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 15,815.60 9,028.35 15,799.62 9,015.22 15,776.63 9,010.26 15,767.96 9,017.90 15,781.32 9,030.84 15,803.97 9,037.07 15,814.87 9,023.29 24,061.97
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 15,815.60 9,028.35 15,799.62 9,015.22 15,776.63 9,010.26 15,767.96 9,017.90 15,781.32 9,030.84 15,803.97 9,037.07 15,814.87 9,023.29 24,061.97
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 15,815.60 9,028.35 15,799.62 9,015.22 15,776.63 9,010.26 15,767.96 9,017.90 15,781.32 9,030.84 15,803.97 9,037.07 15,814.87 9,023.29 24,061.97
83 Baja Tulangan (Ulir) D32 Kg 9,037.49 15,815.60 9,028.35 15,799.62 9,015.22 15,776.63 9,010.26 15,767.96 9,017.90 15,781.32 9,030.84 15,803.97 9,037.07 15,814.87 9,023.29 24,061.97
84 Baja Tulangan (Ulir) D36 Kg 9,037.49 15,815.60 9,028.35 15,799.62 9,015.22 15,776.63 9,010.26 15,767.96 9,017.90 15,781.32 9,030.84 15,803.97 9,037.07 15,814.87 9,023.29 24,061.97
85 Besi Beton Kg 9,037.49 10,041.65 9,028.35 10,031.50 9,015.22 10,016.91 9,010.26 10,011.40 9,017.90 10,019.88 9,030.84 10,034.27 9,037.07 10,041.19 9,023.29 18,297.08
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 9,215,223.59 11,058,870.81 9,205,910.15 11,047,694.07 9,192,518.53 11,031,623.26 9,187,465.97 11,025,559.84 9,195,247.86 11,034,898.63 9,208,447.77 11,050,739.38 9,214,799.39 11,058,361.74 9,200,751.70 19,475,371.83
87 Box Culvert Type DUB 200×200 M' 10,016,547.38 11,940,527.81 10,006,424.08 11,928,460.02 9,991,867.97 11,911,107.98 9,986,376.05 11,904,561.16 9,994,834.63 11,914,644.48 10,009,182.36 11,931,748.11 10,016,086.29 11,939,978.16 10,000,817.06 21,089,024.10
88 Box Culvert Type uk 300×200 M' 11,058,870.81 11,058,870.81 11,047,694.07 11,047,694.07 11,031,623.26 11,031,623.26 11,025,559.84 11,025,559.84 11,034,898.63 11,034,898.63 11,050,739.38 11,050,739.38 11,058,361.74 11,058,361.74 11,041,503.59 21,162,696.89
89 Casing M2 10,041.65 11,045.82 10,031.50 11,034.65 10,016.91 11,018.60 10,011.40 11,012.55 10,019.88 11,021.87 10,034.27 11,037.69 10,041.19 11,045.31 10,025.88 20,218.69
90 Ducting (Kabel Prestress) M' 134,558.13 155,645.60 134,422.14 155,488.29 134,226.60 155,262.11 134,152.82 155,176.77 134,266.45 155,308.21 134,459.19 155,531.15 134,551.94 155,638.43 134,346.82 278,550.16
91 Ducting (Strand Prestress) M' 126,524.81 135,562.30 126,396.94 135,425.29 126,213.07 135,228.29 126,143.70 135,153.96 126,250.54 135,268.44 126,431.78 135,462.62 126,518.98 135,556.06 126,326.11 251,146.22
92 Expansion Cap M2 7,029.16 8,033.32 7,022.05 8,025.20 7,011.84 8,013.53 7,007.98 8,009.12 7,013.92 8,015.91 7,023.99 8,027.41 7,028.83 8,032.95 7,018.12 14,453.86
93 Expansion Join Baja Siku M' 1,595,618.42 1,744,234.87 1,594,005.80 1,742,472.04 1,591,687.04 1,739,937.31 1,590,812.18 1,738,980.97 1,592,159.62 1,740,453.91 1,594,445.19 1,742,952.36 1,595,544.97 1,744,154.58 1,593,112.61 3,201,822.20
94 Expansion Join Tipe Rubber M' 1,179,894.05 1,262,235.59 1,178,701.58 1,260,959.91 1,176,986.95 1,259,125.62 1,176,340.04 1,258,433.55 1,177,336.41 1,259,499.46 1,179,026.49 1,261,307.49 1,179,839.74 1,262,177.49 1,178,041.11 2,340,104.62
95 Expansion Join Tipe Torma M' 1,432,943.67 1,448,006.15 1,431,495.45 1,446,542.71 1,429,413.09 1,444,438.46 1,428,627.43 1,443,644.54 1,429,837.50 1,444,867.32 1,431,890.05 1,446,941.45 1,432,877.71 1,447,939.49 1,430,693.33 2,757,177.07
96 Expansion Tipe Joint Asphaltic Plug M' 1,605,660.08 1,718,126.57 1,604,037.30 1,716,390.13 1,601,703.95 1,713,893.34 1,600,823.59 1,712,951.32 1,602,179.51 1,714,402.21 1,604,479.46 1,716,863.26 1,605,586.16 1,718,047.48 1,603,138.49 3,184,945.13
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 32,133.28 52,216.59 32,100.81 52,163.81 32,054.11 52,087.93 32,036.49 52,059.30 32,063.63 52,103.40 32,109.66 52,178.19 32,131.81 52,214.18 32,082.82 81,543.30
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 25,104.13 26,108.29 25,078.76 26,081.91 25,042.28 26,043.97 25,028.51 26,029.65 25,049.71 26,051.70 25,085.67 26,089.10 25,102.97 26,107.09 25,064.70 49,042.85
99 Glass Bead Kg 35,145.78 56,233.25 35,110.26 56,176.42 35,059.19 56,094.70 35,039.92 56,063.87 35,069.60 56,111.35 35,119.94 56,191.90 35,144.16 56,230.66 35,090.59 88,310.72
100 Joint Sealent Kg 34,141.62 36,149.95 34,107.11 36,113.41 34,057.49 36,060.88 34,038.78 36,041.06 34,067.61 36,071.58 34,116.51 36,123.36 34,140.04 36,148.28 34,088.00 67,339.93
101 Joint Socket Pile 16×16×16 Set 72,299.89 73,304.06 72,226.82 73,229.97 72,121.75 73,123.44 72,082.11 73,083.25 72,143.17 73,145.16 72,246.73 73,250.16 72,296.56 73,300.68 72,186.35 139,358.55
102 Joint Socket Pile 35×35 Set 604,507.42 626,599.05 603,896.47 625,965.78 603,018.00 625,055.20 602,686.55 624,711.64 603,197.04 625,240.78 604,062.94 626,138.32 604,479.59 626,570.21 603,558.08 1,178,866.49
103 Kawat Beton Kg 12,049.98 19,972.84 12,037.80 19,952.66 12,020.29 19,923.63 12,013.69 19,912.68 12,023.86 19,929.55 12,041.12 19,958.16 12,049.43 19,971.93 12,031.06 30,969.75
104 Kawat Bronjong Kg 13,054.15 27,112.46 13,040.95 27,085.06 13,021.98 27,045.66 13,014.83 27,030.79 13,025.85 27,053.69 13,044.55 27,092.52 13,053.55 27,111.21 13,033.65 39,017.17
105 Kawat Las Dos 88,366.53 144,599.78 88,277.22 144,453.64 88,148.81 144,243.51 88,100.36 144,164.23 88,174.98 144,286.33 88,301.56 144,493.46 88,362.47 144,593.13 88,227.76 225,246.67
106 Kayu Acuan (Kelas III/Meranti) M3 2,003,309.48 4,016,660.60 2,001,284.82 4,012,601.13 1,998,373.59 4,006,764.10 1,997,275.21 4,004,561.82 1,998,966.93 4,007,953.74 2,001,836.47 4,013,707.21 2,003,217.26 4,016,475.71 2,000,163.41 5,843,802.32
107 Kayu Perancah (Gelam) M3 2,162,803.04 2,219,763.14 2,160,617.18 2,217,519.72 2,157,474.18 2,214,293.94 2,156,288.35 2,213,076.88 2,158,114.75 2,214,951.39 2,161,212.76 2,218,130.98 2,162,703.48 2,219,660.96 2,159,406.50 4,195,696.93
108 Kerb Pracetak Type 1 (Peninggi) Buah 31,129.12 44,183.27 31,097.66 44,138.61 31,052.42 44,074.41 31,035.35 44,050.18 31,061.64 44,087.49 31,106.23 44,150.78 31,127.69 44,181.23 31,080.23 72,603.57
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 52,216.59 76,316.55 52,163.81 76,239.42 52,087.93 76,128.52 52,059.30 76,086.67 52,103.40 76,151.12 52,178.19 76,260.44 52,214.18 76,313.04 52,134.59 123,985.86
110 Marmer Nama Jembatan Buah 469,949.29 480,995.11 469,474.33 480,508.99 468,791.40 479,810.00 468,533.73 479,546.28 468,930.59 479,952.46 469,603.74 480,641.44 469,927.66 480,972.97 469,211.27 910,342.20
111 Mata Kucing Buah 114,474.83 126,524.81 114,359.13 126,396.94 114,192.78 126,213.07 114,130.01 126,143.70 114,226.68 126,250.54 114,390.66 126,431.78 114,469.56 126,518.98 114,295.05 231,094.66
112 Matras Concrete (Tebal=10 cm) M2 106,441.51 117,487.32 106,333.93 117,368.58 106,179.25 117,197.85 106,120.89 117,133.43 106,210.77 117,232.65 106,363.24 117,400.94 106,436.61 117,481.91 106,274.35 214,719.19
113 Mini Pile 16×16×16 M' 108,449.84 108,449.84 108,340.23 108,340.23 108,182.63 108,182.63 108,123.17 108,123.17 108,214.75 108,214.75 108,370.09 108,370.09 108,444.84 108,444.84 108,279.52 207,533.94
114 Mini Timber Pile Buah 24,099.96 25,643.47 24,075.61 25,617.56 24,040.58 25,580.29 24,027.37 25,566.23 24,047.72 25,587.89 24,082.24 25,624.62 24,098.85 25,642.29 24,062.12 47,659.74
115 Multipleks 12 mm Lbr 128,533.14 165,687.25 128,403.24 165,519.80 128,216.45 165,279.02 128,145.98 165,188.18 128,254.52 165,328.09 128,438.63 165,565.42 128,527.22 165,679.62 128,331.29 283,061.91
116 Paku Kg 12,049.98 18,998.80 12,037.80 18,979.60 12,020.29 18,951.99 12,013.69 18,941.58 12,023.86 18,957.62 12,041.12 18,984.84 12,049.43 18,997.93 12,031.06 29,997.24
117 Paving Block (Model Bata 8 cm) M2 50,208.26 76,316.55 50,157.51 76,239.42 50,084.55 76,128.52 50,057.02 76,086.67 50,099.42 76,151.12 50,171.34 76,260.44 50,205.95 76,313.04 50,129.41 122,147.82
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 52,889,378.49 53,272,969.58 52,835,925.42 53,219,128.83 52,759,066.27 53,141,712.24 52,730,067.83 53,112,503.48 52,774,730.85 53,157,490.43 52,850,489.70 53,233,798.74 52,886,943.87 53,270,517.30 52,806,319.25 101,594,215.90
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 74,926,786.89 75,470,040.24 74,851,061.54 75,393,765.84 74,742,177.50 75,284,092.35 74,701,096.28 75,242,713.27 74,764,369.03 75,306,444.78 74,871,694.31 75,414,548.21 74,923,337.83 75,466,566.17 74,809,119.37 143,925,292.36
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 122,040,207.44 144,244,307.25 121,916,866.53 144,098,525.59 121,739,517.00 143,888,908.94 121,672,604.21 143,809,821.97 121,775,662.41 143,931,630.67 121,950,473.04 144,138,246.50 122,034,589.64 144,237,667.34 121,848,551.44 255,710,245.29
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 188,319,124.05 189,153,585.29 188,128,797.83 188,962,415.71 187,855,131.40 188,687,536.64 187,751,878.88 188,583,826.60 187,910,907.04 188,743,559.43 188,180,655.73 189,014,503.40 188,310,455.27 189,144,878.10 188,023,381.44 361,208,148.48
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 232,393,940.85 241,121,140.18 232,159,070.06 240,877,449.17 231,821,353.85 240,527,050.55 231,693,935.78 240,394,847.49 231,890,183.41 240,598,464.90 232,223,064.95 240,943,847.29 232,383,243.20 241,110,040.79 232,028,981.68 453,431,821.43
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 280,315,714.34 290,912,669.18 280,032,411.03 290,618,655.97 279,625,054.63 290,195,900.01 279,471,361.77 290,036,397.01 279,708,077.47 290,282,061.42 280,109,602.26 290,698,765.31 280,302,810.74 290,899,277.77 279,875,497.22 547,003,660.48
124 Pelat Rambu (Eng. Grade) Buah 154,641.43 168,699.75 154,485.14 168,529.25 154,260.42 168,284.09 154,175.63 168,191.60 154,306.22 168,334.06 154,527.73 168,575.70 154,634.31 168,691.98 154,398.58 309,964.26
125 Pelat Rambu (High L Grade) Buah 190,791.38 196,816.37 190,598.55 196,617.46 190,321.29 196,331.44 190,216.69 196,223.53 190,377.80 196,389.73 190,651.09 196,671.65 190,782.60 196,807.31 190,491.75 371,121.53
126 Pemantul Cahaya (Reflector) Buah 11,045.82 12,049.98 11,034.65 12,037.80 11,018.60 12,020.29 11,012.55 12,013.69 11,021.87 12,023.86 11,037.69 12,041.12 11,045.31 12,049.43 11,028.47 22,140.30
127 Pipa Baja D10" Kg 12,049.98 18,074.97 12,037.80 18,056.71 12,020.29 18,030.44 12,013.69 18,020.53 12,023.86 18,035.79 12,041.12 18,061.68 12,049.43 18,074.14 12,031.06 29,074.86
128 Pipa Drainase Baja Dia 3" M' 217,903.84 220,916.33 217,683.61 220,693.06 217,366.95 220,372.03 217,247.48 220,250.90 217,431.49 220,437.46 217,743.62 220,753.90 217,893.81 220,906.16 217,561.63 419,997.25
129 Pipa Galvanis Dia 1,5" M' 83,345.71 87,362.37 83,261.47 87,274.07 83,140.36 87,147.12 83,094.66 87,099.22 83,165.04 87,172.99 83,284.42 87,298.13 83,341.87 87,358.35 83,214.82 163,504.03
130 Pipa Galvanis Dia 2" M' 113,470.66 252,045.45 113,355.98 251,790.72 113,191.09 251,424.45 113,128.87 251,286.25 113,224.69 251,499.10 113,387.23 251,860.13 113,465.44 252,033.85 113,292.46 355,499.16
131 Pipa Galvanis Dia 3" M' 105,174.25 193,803.87 105,067.95 193,608.00 104,915.11 193,326.37 104,857.45 193,220.11 104,946.26 193,383.77 105,096.92 193,661.37 105,169.41 193,794.95 105,009.08 289,756.08
132 Pipa Porus M' 35,145.78 36,149.95 35,110.26 36,113.41 35,059.19 36,060.88 35,039.92 36,041.06 35,069.60 36,071.58 35,119.94 36,123.36 35,144.16 36,148.28 35,090.59 68,258.96
133 Pipa PVC Dia 4" M' 50,208.26 150,624.77 50,157.51 150,472.54 50,084.55 150,253.65 50,057.02 150,171.07 50,099.42 150,298.27 50,171.34 150,514.02 50,205.95 150,617.84 50,129.41 196,339.34
134 Plastik Filter M2 24,099.96 29,120.79 24,075.61 29,091.36 24,040.58 29,049.04 24,027.37 29,033.07 24,047.72 29,057.66 24,082.24 29,099.38 24,098.85 29,119.45 24,062.12 51,131.59
135 Rel Pengaman M' 120,499.82 136,566.46 120,378.03 136,428.44 120,202.92 136,229.98 120,136.85 136,155.10 120,238.61 136,270.43 120,411.22 136,466.05 120,494.27 136,560.17 120,310.58 246,634.68
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,600,639.25 1,645,826.68 1,599,021.55 1,644,163.31 1,596,695.49 1,641,771.59 1,595,817.89 1,640,869.21 1,597,169.56 1,642,259.04 1,599,462.32 1,644,616.53 1,600,565.57 1,645,750.92 1,598,125.55 3,108,163.67
137 Strip Bearing Buah 248,028.79 252,045.45 247,778.12 251,790.72 247,417.68 251,424.45 247,281.69 251,286.25 247,491.14 251,499.10 247,846.42 251,860.13 248,017.37 252,033.85 247,639.28 478,648.16
138 Tiang Pancang Baja Diameter 400 M' 553,295.00 583,419.95 552,735.81 582,830.31 551,931.75 581,982.49 551,628.39 581,662.61 552,095.63 582,155.28 552,888.17 582,990.97 553,269.53 583,393.10 552,426.09 1,088,885.05
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 640,657.37 712,957.26 640,009.88 712,236.70 639,078.87 711,200.63 638,727.61 710,809.72 639,268.62 711,411.79 640,186.30 712,433.03 640,627.88 712,924.44 639,651.26 1,298,173.87
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,441,981.16 1,490,181.08 1,440,523.81 1,488,675.02 1,438,428.31 1,486,509.48 1,437,637.70 1,485,692.44 1,438,855.39 1,486,950.84 1,440,920.89 1,489,085.38 1,441,914.78 1,490,112.49 1,439,716.62 2,807,556.97
HARGA SATUAN DASAR UPAH KABUPATEN SITUBONDO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
2 Tukang OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
3 Mandor OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
4 Operator OH 273,000 273,000 273,738.64 273,738.64 274,116.02 274,116.02 274,123.65 274,123.65 273,761.60 273,761.60 273,370.55 273,370.55 273,311.38 273,311.38 273,632.22 273,632.22 274,030.18 274,030.18
5 Pembantu Operator OH 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
6 Sopir OH 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
7 Pembantu Sopir OH 111,000 111,000 111,300.33 111,300.33 111,453.76 111,453.76 111,456.87 111,456.87 111,309.66 111,309.66 111,150.66 111,150.66 111,126.60 111,126.60 111,257.06 111,257.06 111,418.86 111,418.86
8 Mekanik OH 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
9 Pembantu Mekanik OH 111,000 111,000 111,300.33 111,300.33 111,453.76 111,453.76 111,456.87 111,456.87 111,309.66 111,309.66 111,150.66 111,150.66 111,126.60 111,126.60 111,257.06 111,257.06 111,418.86 111,418.86
10 Kepala Tukang OH 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
11 Pemasak Aspal OH 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01

HARGA SATUAN DASAR ALAT KABUPATEN SITUBONDO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 402,295 449,000 403,383.90 450,214.84 403,940.00 450,835.50 403,951.24 450,848.05 403,417.72 450,252.59 402,841.48 449,609.45 402,754.27 449,512.12 403,227.08 450,039.81 403,813.51 450,694.32
2 Asphalt Distribution Unit/Jam 247,698 319,000 248,368.00 319,863.10 248,710.40 320,304.06 248,717.32 320,312.98 248,388.83 319,889.93 248,034.03 319,432.99 247,980.34 319,363.84 248,271.45 319,738.75 248,632.52 320,203.76
3 Asphalt Finisher Unit/Jam 181,930 863,000 182,422.02 865,334.98 182,673.50 866,527.92 182,678.59 866,552.04 182,437.31 865,407.54 182,176.72 864,171.39 182,137.28 863,984.31 182,351.10 864,998.57 182,616.30 866,256.57
4 Asphalt Liquid Mixer Unit/Jam 64,914 119,000 65,089.55 119,321.97 65,179.28 119,486.47 65,181.09 119,489.79 65,095.00 119,331.98 65,002.02 119,161.52 64,987.95 119,135.73 65,064.24 119,275.58 65,158.87 119,449.05
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 87,121 87,121 87,357.02 87,357.02 87,477.45 87,477.45 87,479.89 87,479.89 87,364.35 87,364.35 87,239.56 87,239.56 87,220.67 87,220.67 87,323.06 87,323.06 87,450.06 87,450.06
6 Asphalt Mixing Plant Unit/Jam 973,709 4,994,612 976,343.19 5,008,125.83 977,689.16 5,015,029.98 977,716.38 5,015,169.59 976,425.06 5,008,545.81 975,030.32 5,001,391.54 974,819.26 5,000,308.86 975,963.62 5,006,178.87 977,383.01 5,013,459.55
7 Asphalt Sprayer Unit/Jam 80,288 80,288 80,505.49 80,505.49 80,616.47 80,616.47 80,618.72 80,618.72 80,512.24 80,512.24 80,397.24 80,397.24 80,379.83 80,379.83 80,474.19 80,474.19 80,591.23 80,591.23
8 Asphalt Tanker Unit/Jam 375,817 436,000 376,834.21 437,179.66 377,353.71 437,782.36 377,364.22 437,794.54 376,865.81 437,216.33 376,327.49 436,591.80 376,246.03 436,497.29 376,687.71 437,009.71 377,235.55 437,645.27
9 Blending Equipment Unit/Jam 122,141 193,000 122,471.12 193,522.19 122,639.96 193,788.98 122,643.37 193,794.37 122,481.39 193,538.42 122,306.44 193,261.97 122,279.96 193,220.13 122,423.51 193,446.96 122,601.55 193,728.29
10 Bore Pile Machine Unit/Jam 336,527 585,000 337,437.91 586,582.81 337,903.10 587,391.46 337,912.50 587,407.81 337,466.21 586,632.00 336,984.16 585,794.04 336,911.22 585,667.23 337,306.73 586,354.77 337,797.28 587,207.53
11 Bore Pile Machine Dia 60 Unit/Jam 220,366 666,000 220,961.88 667,801.97 221,266.49 668,722.59 221,272.65 668,741.20 220,980.41 667,857.97 220,664.76 666,903.99 220,616.99 666,759.62 220,875.98 667,542.35 221,197.21 668,513.18
12 Bore Pile Machine Dia 80 Unit/Jam 871,213 871,213 873,570.22 873,570.22 874,774.51 874,774.51 874,798.87 874,798.87 873,643.48 873,643.48 872,395.55 872,395.55 872,206.70 872,206.70 873,230.61 873,230.61 874,500.58 874,500.58
13 Bulldozer 100-150 HP Unit/Jam 341,652 341,652 342,576.56 342,576.56 343,048.83 343,048.83 343,058.38 343,058.38 342,605.29 342,605.29 342,115.90 342,115.90 342,041.84 342,041.84 342,443.38 342,443.38 342,941.41 342,941.41
14 Cement Tanker Unit/Jam 317,737 410,000 318,596.20 411,109.32 319,035.41 411,676.07 319,044.29 411,687.53 318,622.92 411,143.79 318,167.79 410,556.51 318,098.91 410,467.63 318,472.34 410,949.49 318,935.51 411,547.15
15 Cold Milling Unit/Jam 496,250 1,056,000 497,592.45 1,058,857.17 498,278.42 1,060,316.90 498,292.30 1,060,346.41 497,634.18 1,058,945.96 496,923.35 1,057,433.35 496,815.78 1,057,204.44 497,399.00 1,058,445.53 498,122.39 1,059,984.87
16 Cold Recycler Unit/Jam 4,179,260 4,179,260 4,190,567.74 4,190,567.74 4,196,344.81 4,196,344.81 4,196,461.62 4,196,461.62 4,190,919.15 4,190,919.15 4,184,932.79 4,184,932.79 4,184,026.86 4,184,026.86 4,188,938.60 4,188,938.60 4,195,030.74 4,195,030.74
17 Compressor 4000-6500 L\M Unit/Jam 127,265 127,265 127,609.77 127,609.77 127,785.69 127,785.69 127,789.25 127,789.25 127,620.47 127,620.47 127,438.17 127,438.17 127,410.59 127,410.59 127,560.16 127,560.16 127,745.67 127,745.67
18 Concrete Breaker Unit/Jam 463,793 884,000 465,047.68 886,391.80 465,688.79 887,613.77 465,701.75 887,638.48 465,086.67 886,466.13 464,422.34 885,199.89 464,321.80 885,008.27 464,866.88 886,047.20 465,542.96 887,335.82
19 Concrete Mixer (350) Unit/Jam 86,267 86,267 86,500.58 86,500.58 86,619.83 86,619.83 86,622.24 86,622.24 86,507.83 86,507.83 86,384.27 86,384.27 86,365.57 86,365.57 86,466.95 86,466.95 86,592.70 86,592.70
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 98,225 98,225 98,490.76 98,490.76 98,626.54 98,626.54 98,629.28 98,629.28 98,499.02 98,499.02 98,358.32 98,358.32 98,337.03 98,337.03 98,452.47 98,452.47 98,595.65 98,595.65
21 Concrete Pan Mixer Unit/Jam 261,364 559,000 262,071.07 560,512.46 262,432.35 561,285.18 262,439.66 561,300.80 262,093.04 560,559.46 261,718.67 559,758.75 261,662.01 559,637.58 261,969.18 560,294.55 262,350.18 561,109.41
22 Concrete Pump Unit/Jam 199,012 214,000 199,550.84 214,579.01 199,825.94 214,874.83 199,831.51 214,880.81 199,567.58 214,597.00 199,282.51 214,290.47 199,239.37 214,244.08 199,473.27 214,495.59 199,763.37 214,807.54
23 Concrete Vibrator Unit/Jam 74,309 74,309 74,510.40 74,510.40 74,613.12 74,613.12 74,615.20 74,615.20 74,516.65 74,516.65 74,410.21 74,410.21 74,394.10 74,394.10 74,481.43 74,481.43 74,589.76 74,589.76
24 Crane 10-15 Ton Unit/Jam 266,489 266,489 267,209.71 267,209.71 267,578.09 267,578.09 267,585.54 267,585.54 267,232.12 267,232.12 266,850.40 266,850.40 266,792.64 266,792.64 267,105.83 267,105.83 267,494.30 267,494.30
25 Crane On Track 35 Ton Unit/Jam 221,220 420,000 221,818.32 421,136.37 222,124.12 421,716.95 222,130.30 421,728.69 221,836.92 421,171.69 221,520.05 420,570.08 221,472.09 420,479.04 221,732.09 420,972.65 222,054.56 421,584.89
26 Crane On Track 75-100 Ton Unit/Jam 347,631 527,000 348,571.65 528,425.88 349,052.18 529,154.36 349,061.90 529,169.09 348,600.88 528,470.19 348,102.93 527,715.32 348,027.58 527,601.08 348,436.14 528,220.45 348,942.88 528,988.66
27 Dump Truck 10 Ton Unit/Jam 328,840 328,840 329,729.94 329,729.94 330,184.50 330,184.50 330,193.69 330,193.69 329,757.59 329,757.59 329,286.56 329,286.56 329,215.27 329,215.27 329,601.75 329,601.75 330,081.10 330,081.10
28 Dump Truck 3-4 M3 Unit/Jam 179,367 235,000 179,852.69 235,635.83 180,100.64 235,960.67 180,105.65 235,967.24 179,867.77 235,655.59 179,610.85 235,318.98 179,571.97 235,268.03 179,782.77 235,544.22 180,044.24 235,886.78
29 Excavator 80-140 HP Unit/Jam 259,656 413,000 260,358.18 414,117.43 260,717.11 414,688.33 260,724.37 414,699.88 260,380.02 414,152.16 260,008.09 413,560.58 259,951.80 413,471.06 260,256.97 413,956.44 260,635.47 414,558.47
30 Flat Bed Truck 3-4 M3 Unit/Jam 315,174 421,000 316,026.87 422,139.08 316,462.55 422,721.04 316,471.35 422,732.80 316,053.38 422,174.48 315,601.92 421,571.44 315,533.60 421,480.18 315,904.01 421,974.97 316,363.45 422,588.66
31 Fulvi Mixer Unit/Jam 789,217 1,233,000 791,351.85 1,236,336.07 792,442.80 1,238,040.47 792,464.86 1,238,074.93 791,418.21 1,236,439.75 790,287.74 1,234,673.60 790,116.66 1,234,406.33 791,044.20 1,235,855.43 792,194.65 1,237,652.78
32 Generator Set Unit/Jam 351,048 372,000 351,997.41 373,006.50 352,482.67 373,520.73 352,492.48 373,531.12 352,026.93 373,037.78 351,524.09 372,504.93 351,447.99 372,424.29 351,860.57 372,861.49 352,372.29 373,403.76
33 Hot Recycler Unit/Jam 2,578,620 7,562,000 2,585,596.57 7,582,460.15 2,589,161.04 7,592,913.24 2,589,233.12 7,593,124.61 2,585,813.39 7,583,096.00 2,582,119.78 7,572,264.21 2,581,560.82 7,570,625.01 2,584,591.38 7,579,512.38 2,588,350.26 7,590,535.56
34 Jack Hammer Unit/Jam 48,685 48,685 48,817.16 48,817.16 48,884.46 48,884.46 48,885.82 48,885.82 48,821.25 48,821.25 48,751.52 48,751.52 48,740.96 48,740.96 48,798.18 48,798.18 48,869.15 48,869.15
35 Launching Gantry Unit/Jam 61,957,766 61,957,766 62,125,402.23 62,125,402.23 62,211,047.59 62,211,047.59 62,212,779.39 62,212,779.39 62,130,611.97 62,130,611.97 62,041,863.79 62,041,863.79 62,028,433.31 62,028,433.31 62,101,250.23 62,101,250.23 62,191,566.55 62,191,566.55
36 Motor Grader > 100 HP Unit/Jam 243,427 253,000 244,085.80 253,684.53 244,422.29 254,034.26 244,429.10 254,041.33 244,106.27 253,705.80 243,757.58 253,343.41 243,704.81 253,288.56 243,990.91 253,585.91 244,345.75 253,954.71
37 Pedestrian Roller Unit/Jam 80,288 80,288 80,505.49 80,505.49 80,616.47 80,616.47 80,618.72 80,618.72 80,512.24 80,512.24 80,397.24 80,397.24 80,379.83 80,379.83 80,474.19 80,474.19 80,591.23 80,591.23
38 Pile Driver + Hammer Unit/Jam 91,392 267,343 91,639.23 268,066.34 91,765.56 268,435.89 91,768.12 268,443.36 91,646.91 268,088.82 91,516.00 267,705.88 91,496.19 267,647.92 91,603.60 267,962.12 91,736.83 268,351.83
39 Rock Drill Breaker Unit/Jam 88,830 288,696 89,069.90 289,477.11 89,192.70 289,876.18 89,195.18 289,884.25 89,077.37 289,501.39 88,950.13 289,087.86 88,930.88 289,025.28 89,035.28 289,364.57 89,164.77 289,785.41
40 Split Form Paver Unit/Jam 187,909 187,909 188,417.11 188,417.11 188,676.86 188,676.86 188,682.11 188,682.11 188,432.91 188,432.91 188,163.75 188,163.75 188,123.01 188,123.01 188,343.86 188,343.86 188,617.77 188,617.77
41 Stone Crusher Unit/Jam 503,083 503,083 504,443.98 504,443.98 505,139.40 505,139.40 505,153.46 505,153.46 504,486.28 504,486.28 503,765.67 503,765.67 503,656.62 503,656.62 504,247.87 504,247.87 504,981.22 504,981.22
42 Tamper Unit/Jam 75,163 75,163 75,366.84 75,366.84 75,470.74 75,470.74 75,472.84 75,472.84 75,373.16 75,373.16 75,265.50 75,265.50 75,249.21 75,249.21 75,337.54 75,337.54 75,447.11 75,447.11
43 Tandem Roller 6-8 T Unit/Jam 363,005 363,005 363,987.59 363,987.59 364,489.38 364,489.38 364,499.53 364,499.53 364,018.12 364,018.12 363,498.15 363,498.15 363,419.46 363,419.46 363,846.09 363,846.09 364,375.24 364,375.24
44 Three Wheel Roller 6-8 T Unit/Jam 120,432 120,432 120,758.24 120,758.24 120,924.71 120,924.71 120,928.08 120,928.08 120,768.36 120,768.36 120,595.86 120,595.86 120,569.75 120,569.75 120,711.29 120,711.29 120,886.85 120,886.85
45 Tire Roller 8-10 T Unit/Jam 215,241 388,629 215,823.23 389,680.83 216,120.76 390,218.04 216,126.78 390,228.91 215,841.33 389,713.51 215,533.02 389,156.84 215,486.36 389,072.60 215,739.33 389,529.34 216,053.09 390,095.85
46 Track Loader 75-100 HP Unit/Jam 201,575 355,738 202,120.17 356,700.99 202,398.81 357,192.73 202,404.44 357,202.68 202,137.12 356,730.90 201,848.38 356,221.34 201,804.69 356,144.23 202,041.59 356,562.32 202,335.43 357,080.88
47 Trailer 20 Ton Unit/Jam 325,424 450,127 326,304.17 451,344.61 326,754.01 451,966.83 326,763.11 451,979.41 326,331.53 451,382.46 325,865.40 450,737.70 325,794.86 450,640.13 326,177.32 451,169.15 326,651.69 451,825.30
48 Trailler 15 Ton Unit/Jam 281,863 428,773 282,625.66 429,933.58 283,015.28 430,526.28 283,023.16 430,538.27 282,649.36 429,969.63 282,245.62 429,355.46 282,184.52 429,262.51 282,515.79 429,766.44 282,926.66 430,391.46
49 Truck Mixer (agitator) Unit/Jam 354,464 521,020 355,423.18 522,429.25 355,913.16 523,149.46 355,923.07 523,164.03 355,452.98 522,473.06 354,945.25 521,726.75 354,868.41 521,613.81 355,285.00 522,226.15 355,801.71 522,985.64
50 Vibrating Rammer Unit/Jam 72,601 72,601 72,797.52 72,797.52 72,897.88 72,897.88 72,899.91 72,899.91 72,803.62 72,803.62 72,699.63 72,699.63 72,683.89 72,683.89 72,769.22 72,769.22 72,875.05 72,875.05
51 Vibratory Roller 5-8 T Unit/Jam 175,097 214,000 175,570.49 214,579.01 175,812.53 214,874.83 175,817.42 214,880.81 175,585.21 214,597.00 175,334.40 214,290.47 175,296.45 214,244.08 175,502.23 214,495.59 175,757.47 214,807.54
52 Water Pump 70-100 MM Unit/Jam 54,664 54,664 54,812.25 54,812.25 54,887.81 54,887.81 54,889.34 54,889.34 54,816.85 54,816.85 54,738.54 54,738.54 54,726.70 54,726.70 54,790.94 54,790.94 54,870.62 54,870.62
53 Water Tanker 3000-4500 L Unit/Jam 198,158 198,158 198,694.40 198,694.40 198,968.32 198,968.32 198,973.86 198,973.86 198,711.07 198,711.07 198,427.22 198,427.22 198,384.27 198,384.27 198,617.16 198,617.16 198,906.02 198,906.02
54 Welding Set Unit/Jam 111,037 111,037 111,337.38 111,337.38 111,490.87 111,490.87 111,493.97 111,493.97 111,346.72 111,346.72 111,187.67 111,187.67 111,163.60 111,163.60 111,294.10 111,294.10 111,455.96 111,455.96
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 193,033 365,865 193,555.75 366,854.90 193,822.59 367,360.65 193,827.98 367,370.87 193,571.99 366,885.67 193,295.49 366,361.60 193,253.64 366,282.30 193,480.51 366,712.28 193,761.89 367,245.61
HARGA SATUAN DASAR BAHAN KABUPATEN SITUBONDO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52 210,486.33 210,486.33 210,792.44 210,792.44
2 Agregat Pecah Mesin 20-30 mm M3 248,000 248,000 248,671.00 248,671.00 249,013.82 249,013.82 249,020.75 249,020.75 248,691.86 248,691.86 248,336.62 248,336.62 248,282.86 248,282.86 248,574.33 248,574.33 248,935.84 248,935.84
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 294,000 294,000 294,795.46 294,795.46 295,201.86 295,201.86 295,210.08 295,210.08 294,820.18 294,820.18 294,399.06 294,399.06 294,335.33 294,335.33 294,680.86 294,680.86 295,109.42 295,109.42
4 Bahan Agr. Base Kelas A M3 226,000 226,000 226,611.48 226,611.48 226,923.88 226,923.88 226,930.20 226,930.20 226,630.48 226,630.48 226,306.76 226,306.76 226,257.77 226,257.77 226,523.38 226,523.38 226,852.82 226,852.82
5 Bahan Agr. Base Kelas B M3 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
6 Bahan Agr. Base Kelas C M3 235,000 235,000 235,635.83 235,635.83 235,960.67 235,960.67 235,967.24 235,967.24 235,655.59 235,655.59 235,318.98 235,318.98 235,268.03 235,268.03 235,544.22 235,544.22 235,886.78 235,886.78
7 Bahan Agr. Base Kelas C2 M3 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
8 Bahan Agr. Base Kelas S M3 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
9 Bahan Pilihan M3 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
10 Bahan Tanah Timbunan M3 102,496 102,496 102,773.32 102,773.32 102,915.00 102,915.00 102,917.87 102,917.87 102,781.94 102,781.94 102,635.12 102,635.12 102,612.90 102,612.90 102,733.36 102,733.36 102,882.77 102,882.77
11 Batu Belah/Kerakal M3 289,000 289,000 289,781.93 289,781.93 290,181.42 290,181.42 290,189.50 290,189.50 289,806.23 289,806.23 289,392.27 289,392.27 289,329.63 289,329.63 289,669.28 289,669.28 290,090.56 290,090.56
12 Batu Kali M3 319,000 319,000 319,863.10 319,863.10 320,304.06 320,304.06 320,312.98 320,312.98 319,889.93 319,889.93 319,432.99 319,432.99 319,363.84 319,363.84 319,738.75 319,738.75 320,203.76 320,203.76
13 Chipping M3 190,000 190,000 190,514.07 190,514.07 190,776.71 190,776.71 190,782.03 190,782.03 190,530.05 190,530.05 190,257.89 190,257.89 190,216.71 190,216.71 190,440.01 190,440.01 190,716.97 190,716.97
14 Chipping (kg) Kg 239 239 239.65 239.65 239.98 239.98 239.98 239.98 239.67 239.67 239.32 239.32 239.27 239.27 239.55 239.55 239.90 239.90
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 341,000 341,000 341,922.63 341,922.63 342,394.00 342,394.00 342,403.53 342,403.53 341,951.30 341,951.30 341,462.85 341,462.85 341,388.94 341,388.94 341,789.70 341,789.70 342,286.78 342,286.78
18 Kapur M3 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
19 Pasir Beton (Kasar) M3 214,000 214,000 214,579.01 214,579.01 214,874.83 214,874.83 214,880.81 214,880.81 214,597.00 214,597.00 214,290.47 214,290.47 214,244.08 214,244.08 214,495.59 214,495.59 214,807.54 214,807.54
20 Pasir Halus (untuk HRS) M3 256,000 256,000 256,692.65 256,692.65 257,046.52 257,046.52 257,053.68 257,053.68 256,714.17 256,714.17 256,347.48 256,347.48 256,291.99 256,291.99 256,592.85 256,592.85 256,966.03 256,966.03
21 Pasir Pasang (Sedang) M3 287,000 287,000 287,776.52 287,776.52 288,173.25 288,173.25 288,181.27 288,181.27 287,800.66 287,800.66 287,389.56 287,389.56 287,327.34 287,327.34 287,664.65 287,664.65 288,083.01 288,083.01
22 Pasir Urug M3 174,000 174,000 174,470.78 174,470.78 174,711.31 174,711.31 174,716.17 174,716.17 174,485.41 174,485.41 174,236.18 174,236.18 174,198.46 174,198.46 174,402.96 174,402.96 174,656.60 174,656.60
23 Pasir Urug (ada unsur lempung) M3 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
24 Sirtu M3 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
26 Anti Pengelupas Liter 86,000 86,000 86,232.69 86,232.69 86,351.57 86,351.57 86,353.97 86,353.97 86,239.92 86,239.92 86,116.73 86,116.73 86,098.09 86,098.09 86,199.16 86,199.16 86,324.53 86,324.53
27 Arbocell Kg 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
28 Asbuton Curah Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
31 Aspal Minyak (Drum) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
34 Aspal Modifikasi (Retona) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
37 Assetilline Botol 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
40 Beton B-0 M3 503,937 503,937 505,300.42 505,300.42 505,997.02 505,997.02 506,011.11 506,011.11 505,342.80 505,342.80 504,620.96 504,620.96 504,511.72 504,511.72 505,103.98 505,103.98 505,838.57 505,838.57
41 Beton K-125 (fc' 10 MPa) M3 521,020 521,020 522,429.25 522,429.25 523,149.46 523,149.46 523,164.03 523,164.03 522,473.06 522,473.06 521,726.75 521,726.75 521,613.81 521,613.81 522,226.15 522,226.15 522,985.64 522,985.64
42 Beton K-175 (fc' 15 MPa) M3 563,726 563,726 565,251.32 565,251.32 566,030.57 566,030.57 566,046.33 566,046.33 565,298.72 565,298.72 564,491.24 564,491.24 564,369.04 564,369.04 565,031.57 565,031.57 565,853.32 565,853.32
43 Beton K-250 (fc' 20 MPa) M3 627,786 627,786 629,484.42 629,484.42 630,352.22 630,352.22 630,369.77 630,369.77 629,537.21 629,537.21 628,637.97 628,637.97 628,501.89 628,501.89 629,239.70 629,239.70 630,154.83 630,154.83
44 Beton K-300 (fc' 25 MPa) M3 653,410 653,410 655,177.67 655,177.67 656,080.89 656,080.89 656,099.15 656,099.15 655,232.61 655,232.61 654,296.67 654,296.67 654,155.03 654,155.03 654,922.96 654,922.96 655,875.44 655,875.44
45 Beton K-350 (fc' 30 MPa) M3 679,034 679,034 680,870.91 680,870.91 681,809.55 681,809.55 681,828.53 681,828.53 680,928.00 680,928.00 679,955.36 679,955.36 679,808.17 679,808.17 680,606.21 680,606.21 681,596.04 681,596.04
46 Beton K-400 (fc' 35 MPa) M3 704,658 704,658 706,564.15 706,564.15 707,538.21 707,538.21 707,557.91 707,557.91 706,623.40 706,623.40 705,614.05 705,614.05 705,461.30 705,461.30 706,289.46 706,289.46 707,316.65 707,316.65
47 Beton K-450 (fc' 40 MPa) M3 738,823 738,823 740,821.81 740,821.81 741,843.09 741,843.09 741,863.74 741,863.74 740,883.93 740,883.93 739,825.64 739,825.64 739,665.49 739,665.49 740,533.80 740,533.80 741,610.79 741,610.79
48 Beton K-500 (fc' 45 MPa) M3 768,717 768,717 770,797.25 770,797.25 771,859.87 771,859.87 771,881.35 771,881.35 770,861.89 770,861.89 769,760.78 769,760.78 769,594.15 769,594.15 770,497.60 770,497.60 771,618.16 771,618.16
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
51 Cat Anti Karat Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
52 Cat Marka (Non Thermoplas) Kg 55,518 55,518 55,668.69 55,668.69 55,745.43 55,745.43 55,746.99 55,746.99 55,673.36 55,673.36 55,593.83 55,593.83 55,581.80 55,581.80 55,647.05 55,647.05 55,727.98 55,727.98
53 Cat Marka (Thermoplastic) Kg 37,923 37,923 38,026.00 38,026.00 38,078.42 38,078.42 38,079.48 38,079.48 38,029.19 38,029.19 37,974.87 37,974.87 37,966.64 37,966.64 38,011.21 38,011.21 38,066.50 38,066.50
54 Cerucuk Diameter 10-15 cm M' 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
55 Cold Mix (Aspal Dingin) Kg 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,115,000 1,115,000 1,118,016.80 1,118,016.80 1,119,558.09 1,119,558.09 1,119,589.25 1,119,589.25 1,118,110.56 1,118,110.56 1,116,513.43 1,116,513.43 1,116,271.74 1,116,271.74 1,117,582.16 1,117,582.16 1,119,207.51 1,119,207.51
57 Curing Compound Liter 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 521,000 521,000 522,409.65 522,409.65 523,129.83 523,129.83 523,144.40 523,144.40 522,453.45 522,453.45 521,707.17 521,707.17 521,594.24 521,594.24 522,206.55 522,206.55 522,966.02 522,966.02
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 606,000 606,000 607,639.63 607,639.63 608,477.31 608,477.31 608,494.25 608,494.25 607,690.58 607,690.58 606,822.55 606,822.55 606,691.19 606,691.19 607,403.40 607,403.40 608,286.77 608,286.77
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 769,000 769,000 771,080.65 771,080.65 772,143.65 772,143.65 772,165.14 772,165.14 771,145.31 771,145.31 770,043.80 770,043.80 769,877.10 769,877.10 770,780.88 770,780.88 771,901.86 771,901.86
61 Kerosen/Minyak Tanah Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
62 Minyak Fluks Liter 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
63 Minyak Pelumas/Olie Liter 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
64 Oxygen (Isi 6 M3) Botol 147,000 147,000 147,397.73 147,397.73 147,600.93 147,600.93 147,605.04 147,605.04 147,410.09 147,410.09 147,199.53 147,199.53 147,167.66 147,167.66 147,340.43 147,340.43 147,554.71 147,554.71
65 Polytene 125 Mikron Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
66 Sand Sheet Ton 1,179,000 1,179,000 1,182,189.97 1,182,189.97 1,183,819.72 1,183,819.72 1,183,852.67 1,183,852.67 1,182,289.10 1,182,289.10 1,180,600.30 1,180,600.30 1,180,344.73 1,180,344.73 1,181,730.37 1,181,730.37 1,183,449.01 1,183,449.01
67 Seal Coat M2 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
68 Seal Guard Kg 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
69 Semen/PC (50 kg) Zak 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
70 Semen/PC (kg) Kg 1,000 1,000 1,002.71 1,002.71 1,004.09 1,004.09 1,004.12 1,004.12 1,002.79 1,002.79 1,001.36 1,001.36 1,001.14 1,001.14 1,002.32 1,002.32 1,003.77 1,003.77
71 Slurry Seal Ton 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
75 Baja Prategang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
77 Baja Tulangan (Polos) U25 Kg 10,000 8,000 10,027.06 8,021.65 10,040.88 8,032.70 10,041.16 8,032.93 10,027.90 8,022.32 10,013.57 8,010.86 10,011.41 8,009.12 10,023.16 8,018.53 10,037.74 8,030.19
78 Baja Tulangan (Polos) U32 Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
81 Baja Tulangan (Ulir) D19 Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
84 Baja Tulangan (Ulir) D36 Kg 9,000 10,000 9,024.35 10,027.06 9,036.79 10,040.88 9,037.04 10,041.16 9,025.11 10,027.90 9,012.22 10,013.57 9,010.27 10,011.41 9,020.84 10,023.16 9,033.96 10,037.74
85 Besi Beton Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,104,000 11,104,000 11,134,043.57 11,134,043.57 11,149,392.84 11,149,392.84 11,149,703.21 11,149,703.21 11,134,977.26 11,134,977.26 11,119,071.91 11,119,071.91 11,116,664.92 11,116,664.92 11,129,715.08 11,129,715.08 11,145,901.47 11,145,901.47
87 Box Culvert Type DUB 200×200 M' 11,787,000 11,787,000 11,818,891.54 11,818,891.54 11,835,184.92 11,835,184.92 11,835,514.39 11,835,514.39 11,819,882.65 11,819,882.65 11,802,998.98 11,802,998.98 11,800,443.93 11,800,443.93 11,814,296.80 11,814,296.80 11,831,478.80 11,831,478.80
88 Box Culvert Type uk 300×200 M' 12,727,000 12,727,000 12,761,434.85 12,761,434.85 12,779,027.62 12,779,027.62 12,779,383.35 12,779,383.35 12,762,505.00 12,762,505.00 12,744,274.88 12,744,274.88 12,741,516.07 12,741,516.07 12,756,473.69 12,756,473.69 12,775,025.94 12,775,025.94
89 Casing M2 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
90 Ducting (Kabel Prestress) M' 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
91 Ducting (Strand Prestress) M' 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
92 Expansion Cap M2 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
93 Expansion Join Baja Siku M' 1,859,000 1,859,000 1,864,029.81 1,864,029.81 1,866,599.54 1,866,599.54 1,866,651.50 1,866,651.50 1,864,186.12 1,864,186.12 1,861,523.30 1,861,523.30 1,861,120.32 1,861,120.32 1,863,305.15 1,863,305.15 1,866,015.02 1,866,015.02
94 Expansion Join Tipe Rubber M' 1,346,000 1,346,000 1,349,641.81 1,349,641.81 1,351,502.41 1,351,502.41 1,351,540.03 1,351,540.03 1,349,754.99 1,349,754.99 1,347,826.98 1,347,826.98 1,347,535.21 1,347,535.21 1,349,117.12 1,349,117.12 1,351,079.19 1,351,079.19
95 Expansion Join Tipe Torma M' 1,543,000 1,543,000 1,547,174.82 1,547,174.82 1,549,307.74 1,549,307.74 1,549,350.87 1,549,350.87 1,547,304.57 1,547,304.57 1,545,094.38 1,545,094.38 1,544,759.90 1,544,759.90 1,546,573.34 1,546,573.34 1,548,822.58 1,548,822.58
96 Expansion Tipe Joint Asphaltic Plug M' 1,831,000 1,831,000 1,835,954.05 1,835,954.05 1,838,485.08 1,838,485.08 1,838,536.26 1,838,536.26 1,836,108.01 1,836,108.01 1,833,485.29 1,833,485.29 1,833,088.39 1,833,088.39 1,835,240.30 1,835,240.30 1,837,909.36 1,837,909.36
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80 27,062.53 27,062.53 27,101.89 27,101.89
99 Glass Bead Kg 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
100 Joint Sealent Kg 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
101 Joint Socket Pile 16×16×16 Set 78,000 78,000 78,211.04 78,211.04 78,318.86 78,318.86 78,321.04 78,321.04 78,217.60 78,217.60 78,105.87 78,105.87 78,088.96 78,088.96 78,180.64 78,180.64 78,294.34 78,294.34
102 Joint Socket Pile 35×35 Set 668,000 668,000 669,807.38 669,807.38 670,730.77 670,730.77 670,749.44 670,749.44 669,863.55 669,863.55 668,906.70 668,906.70 668,761.90 668,761.90 669,546.98 669,546.98 670,520.73 670,520.73
103 Kawat Beton Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
104 Kawat Bronjong Kg 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
105 Kawat Las Dos 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
106 Kayu Acuan (Kelas III/Meranti) M3 3,673,000 3,673,000 3,682,937.86 3,682,937.86 3,688,015.12 3,688,015.12 3,688,117.79 3,688,117.79 3,683,246.71 3,683,246.71 3,677,985.51 3,677,985.51 3,677,189.32 3,677,189.32 3,681,506.08 3,681,506.08 3,686,860.24 3,686,860.24
107 Kayu Perancah (Gelam) M3 2,366,000 2,366,000 2,372,401.58 2,372,401.58 2,375,672.14 2,375,672.14 2,375,738.27 2,375,738.27 2,372,600.52 2,372,600.52 2,369,211.47 2,369,211.47 2,368,698.59 2,368,698.59 2,371,479.28 2,371,479.28 2,374,928.21 2,374,928.21
108 Kerb Pracetak Type 1 (Peninggi) Buah 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 81,000 81,000 81,219.16 81,219.16 81,331.13 81,331.13 81,333.39 81,333.39 81,225.97 81,225.97 81,109.94 81,109.94 81,092.39 81,092.39 81,187.58 81,187.58 81,305.66 81,305.66
110 Marmer Nama Jembatan Buah 512,000 512,000 513,385.29 513,385.29 514,093.04 514,093.04 514,107.35 514,107.35 513,428.35 513,428.35 512,694.96 512,694.96 512,583.97 512,583.97 513,185.71 513,185.71 513,932.06 513,932.06
111 Mata Kucing Buah 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
112 Matras Concrete (Tebal=10 cm) M2 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
113 Mini Pile 16×16×16 M' 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
114 Mini Timber Pile Buah 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80 27,062.53 27,062.53 27,101.89 27,101.89
115 Multipleks 12 mm Lbr 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
116 Paku Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
117 Paving Block (Model Bata 8 cm) M2 81,000 81,000 81,219.16 81,219.16 81,331.13 81,331.13 81,333.39 81,333.39 81,225.97 81,225.97 81,109.94 81,109.94 81,092.39 81,092.39 81,187.58 81,187.58 81,305.66 81,305.66
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 56,781,000 56,781,000 56,934,629.70 56,934,629.70 57,013,119.12 57,013,119.12 57,014,706.23 57,014,706.23 56,939,404.15 56,939,404.15 56,858,071.16 56,858,071.16 56,845,762.84 56,845,762.84 56,912,495.68 56,912,495.68 56,995,265.78 56,995,265.78
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 80,440,000 80,440,000 80,657,642.75 80,657,642.75 80,768,836.45 80,768,836.45 80,771,084.85 80,771,084.85 80,664,406.58 80,664,406.58 80,549,184.49 80,549,184.49 80,531,747.65 80,531,747.65 80,626,286.12 80,626,286.12 80,743,544.14 80,743,544.14
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 153,743,000 153,743,000 154,158,975.25 154,158,975.25 154,371,497.04 154,371,497.04 154,375,794.36 154,375,794.36 154,171,902.80 154,171,902.80 153,951,681.63 153,951,681.63 153,918,355.03 153,918,355.03 154,099,044.10 154,099,044.10 154,323,156.47 154,323,156.47
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 201,610,000 201,610,000 202,155,486.76 202,155,486.76 202,434,175.98 202,434,175.98 202,439,811.25 202,439,811.25 202,172,439.22 202,172,439.22 201,883,653.46 201,883,653.46 201,839,950.81 201,839,950.81 202,076,896.39 202,076,896.39 202,370,784.85 202,370,784.85
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 257,000,000 257,000,000 257,695,352.90 257,695,352.90 258,050,608.74 258,050,608.74 258,057,792.23 258,057,792.23 257,716,962.85 257,716,962.85 257,348,836.56 257,348,836.56 257,293,127.11 257,293,127.11 257,595,170.73 257,595,170.73 257,969,801.63 257,969,801.63
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 310,070,000 310,070,000 310,908,941.92 310,908,941.92 311,337,557.40 311,337,557.40 311,346,224.26 311,346,224.26 310,935,014.29 310,935,014.29 310,490,870.64 310,490,870.64 310,423,657.29 310,423,657.29 310,788,072.33 310,788,072.33 311,240,063.78 311,240,063.78
124 Pelat Rambu (Eng. Grade) Buah 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
125 Pelat Rambu (High L Grade) Buah 209,000 209,000 209,565.48 209,565.48 209,854.39 209,854.39 209,860.23 209,860.23 209,583.06 209,583.06 209,283.68 209,283.68 209,238.38 209,238.38 209,484.01 209,484.01 209,788.67 209,788.67
126 Pemantul Cahaya (Reflector) Buah 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
127 Pipa Baja D10" Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
128 Pipa Drainase Baja Dia 3" M' 235,000 235,000 235,635.83 235,635.83 235,960.67 235,960.67 235,967.24 235,967.24 235,655.59 235,655.59 235,318.98 235,318.98 235,268.03 235,268.03 235,544.22 235,544.22 235,886.78 235,886.78
129 Pipa Galvanis Dia 1,5" M' 93,000 93,000 93,251.63 93,251.63 93,380.18 93,380.18 93,382.78 93,382.78 93,259.45 93,259.45 93,126.23 93,126.23 93,106.07 93,106.07 93,215.37 93,215.37 93,350.94 93,350.94
130 Pipa Galvanis Dia 2" M' 269,000 269,000 269,727.82 269,727.82 270,099.66 270,099.66 270,107.18 270,107.18 269,750.44 269,750.44 269,365.12 269,365.12 269,306.81 269,306.81 269,622.96 269,622.96 270,015.08 270,015.08
131 Pipa Galvanis Dia 3" M' 206,000 206,000 206,557.36 206,557.36 206,842.12 206,842.12 206,847.88 206,847.88 206,574.69 206,574.69 206,279.61 206,279.61 206,234.96 206,234.96 206,477.06 206,477.06 206,777.35 206,777.35
132 Pipa Porus M' 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
133 Pipa PVC Dia 4" M' 100,000 100,000 100,270.57 100,270.57 100,408.80 100,408.80 100,411.59 100,411.59 100,278.97 100,278.97 100,135.73 100,135.73 100,114.06 100,114.06 100,231.58 100,231.58 100,377.35 100,377.35
134 Plastik Filter M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
135 Rel Pengaman M' 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,754,000 1,754,000 1,758,745.72 1,758,745.72 1,761,170.30 1,761,170.30 1,761,219.33 1,761,219.33 1,758,893.20 1,758,893.20 1,756,380.78 1,756,380.78 1,756,000.56 1,756,000.56 1,758,061.98 1,758,061.98 1,760,618.80 1,760,618.80
137 Strip Bearing Buah 269,000 269,000 269,727.82 269,727.82 270,099.66 270,099.66 270,107.18 270,107.18 269,750.44 269,750.44 269,365.12 269,365.12 269,306.81 269,306.81 269,622.96 269,622.96 270,015.08 270,015.08
138 Tiang Pancang Baja Diameter 400 M' 622,000 622,000 623,682.92 623,682.92 624,542.72 624,542.72 624,560.10 624,560.10 623,735.22 623,735.22 622,844.27 622,844.27 622,709.44 622,709.44 623,440.45 623,440.45 624,347.15 624,347.15
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 760,000 760,000 762,056.30 762,056.30 763,106.86 763,106.86 763,128.10 763,128.10 762,120.20 762,120.20 761,031.58 761,031.58 760,866.84 760,866.84 761,760.04 761,760.04 762,867.90 762,867.90
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,589,000 1,589,000 1,593,299.28 1,593,299.28 1,595,495.79 1,595,495.79 1,595,540.20 1,595,540.20 1,593,432.89 1,593,432.89 1,591,156.81 1,591,156.81 1,590,812.37 1,590,812.37 1,592,679.87 1,592,679.87 1,594,996.17 1,594,996.17
HARGA SATUAN DASAR UPAH KABUPATEN SITUBONDO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 102,263.99
2 Tukang OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
3 Mandor OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64
4 Operator OH 274,137.09 274,137.09 273,860.03 273,860.03 273,461.65 273,461.65 273,311.34 273,311.34 273,542.84 273,542.84 273,935.52 273,935.52 274,124.47 274,124.47 273,706.57 273,706.57
5 Pembantu Operator OH 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 171,442.58
6 Sopir OH 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 128,331.29
7 Pembantu Sopir OH 111,462.33 111,462.33 111,349.68 111,349.68 111,187.70 111,187.70 111,126.59 111,126.59 111,220.72 111,220.72 111,380.38 111,380.38 111,457.20 111,457.20 111,287.29 111,287.29
8 Mekanik OH 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 154,398.58
9 Pembantu Mekanik OH 111,462.33 111,462.33 111,349.68 111,349.68 111,187.70 111,187.70 111,126.59 111,126.59 111,220.72 111,220.72 111,380.38 111,380.38 111,457.20 111,457.20 111,287.29 111,287.29
10 Kepala Tukang OH 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 128,331.29
11 Pemasak Aspal OH 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 128,331.29

HARGA SATUAN DASAR ALAT KABUPATEN SITUBONDO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 403,971.05 450,870.15 403,562.77 450,414.48 402,975.72 449,759.27 402,754.22 449,512.06 403,095.36 449,892.81 403,674.01 450,538.63 403,952.45 450,849.40 403,336.64 819,880.58
2 Asphalt Distribution Unit/Jam 248,729.52 320,328.68 248,478.14 320,004.94 248,116.68 319,539.44 247,980.31 319,363.81 248,190.35 319,634.31 248,546.63 320,093.15 248,718.07 320,313.94 248,338.91 547,465.46
3 Asphalt Finisher Unit/Jam 182,687.54 866,594.53 182,502.91 865,718.69 182,237.43 864,459.35 182,137.26 863,984.21 182,291.53 864,716.02 182,553.22 865,957.33 182,679.13 866,554.63 182,400.64 1,032,431.13
4 Asphalt Liquid Mixer Unit/Jam 65,184.29 119,495.65 65,118.41 119,374.88 65,023.68 119,201.23 64,987.94 119,135.71 65,042.99 119,236.62 65,136.36 119,407.79 65,181.29 119,490.15 65,081.92 178,965.33
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 87,484.18 87,484.18 87,395.76 87,395.76 87,268.63 87,268.63 87,220.66 87,220.66 87,294.54 87,294.54 87,419.85 87,419.85 87,480.15 87,480.15 87,346.79 167,413.21
6 Asphalt Mixing Plant Unit/Jam 977,764.31 5,015,415.46 976,776.13 5,010,346.59 975,355.24 5,003,058.16 974,819.14 5,000,308.28 975,644.83 5,004,543.61 977,045.38 5,011,727.70 977,719.30 5,015,184.59 976,228.80 5,902,399.13
7 Asphalt Sprayer Unit/Jam 80,622.67 80,622.67 80,541.19 80,541.19 80,424.03 80,424.03 80,379.82 80,379.82 80,447.91 80,447.91 80,563.39 80,563.39 80,618.96 80,618.96 80,496.06 154,282.76
8 Asphalt Tanker Unit/Jam 377,382.72 437,816.01 377,001.31 437,373.52 376,452.90 436,737.29 376,245.98 436,497.24 376,564.67 436,866.96 377,105.23 437,494.09 377,365.35 437,795.85 376,790.06 782,513.02
9 Blending Equipment Unit/Jam 122,649.38 193,803.87 122,525.43 193,608.00 122,347.19 193,326.37 122,279.95 193,220.11 122,383.52 193,383.77 122,559.20 193,661.37 122,643.74 193,794.95 122,456.77 305,749.51
10 Bore Pile Machine Unit/Jam 337,929.07 587,436.61 337,587.54 586,842.92 337,096.46 585,989.25 336,911.18 585,667.17 337,196.55 586,163.23 337,680.60 587,004.68 337,913.51 587,409.57 337,398.37 895,790.27
11 Bore Pile Machine Dia 60 Unit/Jam 221,283.50 668,773.99 221,059.86 668,098.09 220,738.29 667,126.22 220,616.96 666,759.54 220,803.83 667,324.30 221,120.80 668,282.25 221,273.32 668,743.21 220,935.99 870,244.68
12 Bore Pile Machine Dia 80 Unit/Jam 874,841.75 874,841.75 873,957.59 873,957.59 872,686.26 872,686.26 872,206.60 872,206.60 872,945.37 872,945.37 874,198.50 874,198.50 874,801.48 874,801.48 873,467.87 1,674,132.12
13 Bulldozer 100-150 HP Unit/Jam 343,075.20 343,075.20 342,728.47 342,728.47 342,229.91 342,229.91 342,041.80 342,041.80 342,331.52 342,331.52 342,822.94 342,822.94 343,059.41 343,059.41 342,536.42 656,522.40
14 Cement Tanker Unit/Jam 319,059.93 411,707.71 318,737.47 411,291.62 318,273.81 410,693.32 318,098.88 410,467.59 318,368.31 410,815.26 318,825.33 411,404.99 319,045.25 411,688.76 318,558.87 703,068.11
15 Cold Milling Unit/Jam 498,316.72 1,060,398.40 497,813.10 1,059,326.70 497,088.94 1,057,785.72 496,815.72 1,057,204.32 497,236.53 1,058,099.79 497,950.32 1,059,618.70 498,293.79 1,060,349.59 497,534.15 1,514,797.75
16 Cold Recycler Unit/Jam 4,196,667.36 4,196,667.36 4,192,425.96 4,192,425.96 4,186,327.34 4,186,327.34 4,184,026.37 4,184,026.37 4,187,570.29 4,187,570.29 4,193,581.61 4,193,581.61 4,196,474.17 4,196,474.17 4,190,076.77 8,030,910.28
17 Compressor 4000-6500 L\M Unit/Jam 127,795.51 127,795.51 127,666.35 127,666.35 127,480.64 127,480.64 127,410.57 127,410.57 127,518.49 127,518.49 127,701.54 127,701.54 127,789.63 127,789.63 127,594.82 244,554.59
18 Concrete Breaker Unit/Jam 465,724.58 887,681.99 465,253.89 886,784.85 464,577.10 885,494.87 464,321.75 885,008.16 464,715.04 885,757.78 465,382.14 887,029.29 465,703.14 887,641.13 464,993.19 1,312,523.92
19 Concrete Mixer (350) Unit/Jam 86,626.49 86,626.49 86,538.94 86,538.94 86,413.05 86,413.05 86,365.56 86,365.56 86,438.71 86,438.71 86,562.79 86,562.79 86,622.50 86,622.50 86,490.45 165,771.91
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 98,634.12 98,634.12 98,534.43 98,534.43 98,391.10 98,391.10 98,337.02 98,337.02 98,420.31 98,420.31 98,561.60 98,561.60 98,629.58 98,629.58 98,479.22 188,750.19
21 Concrete Pan Mixer Unit/Jam 262,452.53 561,328.32 262,187.28 560,761.01 261,805.88 559,945.28 261,661.98 559,637.52 261,883.61 560,111.53 262,259.55 560,915.58 262,440.45 561,302.48 262,040.36 800,646.07
22 Concrete Pump Unit/Jam 199,841.30 214,891.34 199,639.33 214,674.16 199,348.92 214,361.88 199,239.35 214,244.06 199,408.11 214,425.52 199,694.36 214,733.34 199,832.10 214,881.45 199,527.47 397,450.70
23 Concrete Vibrator Unit/Jam 74,618.86 74,618.86 74,543.44 74,543.44 74,435.00 74,435.00 74,394.09 74,394.09 74,457.11 74,457.11 74,563.99 74,563.99 74,615.42 74,615.42 74,501.67 142,793.62
24 Crane 10-15 Ton Unit/Jam 267,598.65 267,598.65 267,328.20 267,328.20 266,939.33 266,939.33 266,792.61 266,792.61 267,018.58 267,018.58 267,401.89 267,401.89 267,586.34 267,586.34 267,178.41 512,087.47
25 Crane On Track 35 Ton Unit/Jam 222,141.19 421,749.36 221,916.68 421,323.12 221,593.86 420,710.23 221,472.07 420,478.99 221,659.66 420,835.14 221,977.85 421,439.26 222,130.96 421,729.95 221,792.33 624,392.96
26 Crane On Track 75-100 Ton Unit/Jam 349,079.01 529,195.03 348,726.21 528,660.20 348,218.93 527,891.17 348,027.54 527,601.02 348,322.32 528,047.91 348,822.34 528,805.93 349,062.94 529,170.67 348,530.81 847,844.70
27 Dump Truck 10 Ton Unit/Jam 330,209.88 330,209.88 329,876.15 329,876.15 329,396.29 329,396.29 329,215.24 329,215.24 329,494.09 329,494.09 329,967.08 329,967.08 330,194.68 330,194.68 329,691.31 631,902.81
28 Dump Truck 3-4 M3 Unit/Jam 180,114.48 235,978.81 179,932.44 235,740.32 179,670.70 235,397.39 179,571.95 235,268.01 179,724.05 235,467.28 179,982.04 235,805.30 180,106.19 235,967.95 179,831.62 400,450.86
29 Excavator 80-140 HP Unit/Jam 260,737.15 414,720.21 260,473.63 414,301.07 260,094.73 413,698.39 259,951.77 413,471.01 260,171.95 413,821.22 260,545.43 414,415.27 260,725.15 414,701.12 260,327.68 652,698.26
30 Flat Bed Truck 3-4 M3 Unit/Jam 316,486.87 422,753.53 316,167.01 422,326.27 315,707.09 421,711.92 315,533.56 421,480.13 315,800.83 421,837.13 316,254.16 422,442.68 316,472.30 422,734.07 315,989.85 711,741.69
31 Fulvi Mixer Unit/Jam 792,503.71 1,238,135.63 791,702.76 1,236,884.30 790,551.09 1,235,085.03 790,116.57 1,234,406.18 790,785.81 1,235,451.74 791,920.99 1,237,225.25 792,467.23 1,238,078.64 791,259.13 1,961,498.84
32 Generator Set Unit/Jam 352,509.77 373,549.44 352,153.50 373,171.91 351,641.23 372,629.06 351,447.95 372,424.25 351,745.63 372,739.70 352,250.57 373,274.77 352,493.54 373,532.24 351,956.17 695,583.40
33 Hot Recycler Unit/Jam 2,589,360.06 7,593,496.87 2,586,743.10 7,585,822.44 2,582,980.23 7,574,787.53 2,581,560.52 7,570,624.13 2,583,747.13 7,577,036.54 2,587,456.14 7,587,913.48 2,589,240.86 7,593,147.32 2,585,293.64 9,951,380.98
34 Jack Hammer Unit/Jam 48,888.22 48,888.22 48,838.81 48,838.81 48,767.76 48,767.76 48,740.96 48,740.96 48,782.24 48,782.24 48,852.27 48,852.27 48,885.97 48,885.97 48,811.44 93,554.44
35 Launching Gantry Unit/Jam 62,215,829.43 62,215,829.43 62,152,950.51 62,152,950.51 62,062,538.11 62,062,538.11 62,028,426.11 62,028,426.11 62,080,964.96 62,080,964.96 62,170,083.03 62,170,083.03 62,212,965.49 62,212,965.49 62,118,123.63 119,058,696.25
36 Motor Grader > 100 HP Unit/Jam 244,441.08 254,053.78 244,194.03 253,797.02 243,838.81 253,427.83 243,704.79 253,288.54 243,911.21 253,503.07 244,261.34 253,866.98 244,429.83 254,042.09 244,057.20 477,369.82
37 Pedestrian Roller Unit/Jam 80,622.67 80,622.67 80,541.19 80,541.19 80,424.03 80,424.03 80,379.82 80,379.82 80,447.91 80,447.91 80,563.39 80,563.39 80,618.96 80,618.96 80,496.06 154,282.76
38 Pile Driver + Hammer Unit/Jam 91,772.62 268,456.52 91,679.86 268,185.21 91,546.50 267,795.08 91,496.18 267,647.89 91,573.68 267,874.59 91,705.14 268,259.13 91,768.39 268,444.17 91,628.49 352,026.18
39 Rock Drill Breaker Unit/Jam 89,199.55 289,898.46 89,109.40 289,605.47 88,979.78 289,184.19 88,930.87 289,025.25 89,006.19 289,270.05 89,133.96 289,685.30 89,195.45 289,885.12 89,059.47 371,079.55
40 Split Form Paver Unit/Jam 188,691.36 188,691.36 188,500.66 188,500.66 188,226.45 188,226.45 188,122.99 188,122.99 188,282.33 188,282.33 188,552.62 188,552.62 188,682.67 188,682.67 188,395.03 361,087.32
41 Stone Crusher Unit/Jam 505,178.23 505,178.23 504,667.67 504,667.67 503,933.54 503,933.54 503,656.56 503,656.56 504,083.16 504,083.16 504,806.78 504,806.78 505,154.97 505,154.97 504,384.88 966,729.24
42 Tamper Unit/Jam 75,476.54 75,476.54 75,400.26 75,400.26 75,290.58 75,290.58 75,249.20 75,249.20 75,312.93 75,312.93 75,421.05 75,421.05 75,473.07 75,473.07 75,358.01 144,434.93
43 Tandem Roller 6-8 T Unit/Jam 364,517.40 364,517.40 364,149.00 364,149.00 363,619.28 363,619.28 363,419.42 363,419.42 363,727.24 363,727.24 364,249.37 364,249.37 364,500.62 364,500.62 363,944.95 697,555.05
44 Three Wheel Roller 6-8 T Unit/Jam 120,934.01 120,934.01 120,811.78 120,811.78 120,636.04 120,636.04 120,569.74 120,569.74 120,671.86 120,671.86 120,845.09 120,845.09 120,928.44 120,928.44 120,744.09 231,424.15
45 Tire Roller 8-10 T Unit/Jam 216,137.37 390,248.04 215,918.93 389,853.63 215,604.84 389,286.52 215,486.34 389,072.55 215,668.86 389,402.10 215,978.45 389,961.09 216,127.43 390,230.07 215,797.95 587,446.35
46 Track Loader 75-100 HP Unit/Jam 202,414.37 357,220.19 202,209.80 356,859.16 201,915.65 356,340.05 201,804.66 356,144.19 201,975.60 356,445.85 202,265.53 356,957.53 202,405.05 357,203.74 202,096.49 541,910.93
47 Trailer 20 Ton Unit/Jam 326,779.13 452,001.57 326,448.86 451,544.75 325,973.99 450,887.90 325,794.82 450,640.08 326,070.77 451,021.77 326,538.85 451,669.22 326,764.08 451,980.77 326,265.94 750,363.38
48 Trailler 15 Ton Unit/Jam 283,037.04 430,559.37 282,750.98 430,124.22 282,339.67 429,498.53 282,184.49 429,262.46 282,423.50 429,626.06 282,828.93 430,242.79 283,024.01 430,539.55 282,592.55 688,921.64
49 Truck Mixer (agitator) Unit/Jam 355,940.52 523,189.68 355,580.78 522,660.91 355,063.53 521,900.61 354,868.37 521,613.75 355,168.95 522,055.56 355,678.80 522,804.98 355,924.13 523,165.59 355,381.54 848,128.50
50 Vibrating Rammer Unit/Jam 72,903.48 72,903.48 72,829.80 72,829.80 72,723.86 72,723.86 72,683.88 72,683.88 72,745.45 72,745.45 72,849.87 72,849.87 72,900.12 72,900.12 72,788.99 139,511.01
51 Vibratory Roller 5-8 T Unit/Jam 175,826.04 214,891.34 175,648.34 214,674.16 175,392.83 214,361.88 175,296.42 214,244.06 175,444.90 214,425.52 175,696.76 214,733.34 175,817.95 214,881.45 175,549.92 375,471.68
52 Water Pump 70-100 MM Unit/Jam 54,892.03 54,892.03 54,836.55 54,836.55 54,756.79 54,756.79 54,726.69 54,726.69 54,773.04 54,773.04 54,851.67 54,851.67 54,889.50 54,889.50 54,805.83 105,043.58
53 Water Tanker 3000-4500 L Unit/Jam 198,983.61 198,983.61 198,782.51 198,782.51 198,493.35 198,493.35 198,384.25 198,384.25 198,552.28 198,552.28 198,837.30 198,837.30 198,974.46 198,974.46 198,671.12 380,782.99
54 Welding Set Unit/Jam 111,499.44 111,499.44 111,386.75 111,386.75 111,224.72 111,224.72 111,163.59 111,163.59 111,257.74 111,257.74 111,417.46 111,417.46 111,494.31 111,494.31 111,324.34 213,369.78
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 193,837.49 367,388.88 193,641.58 367,017.58 193,359.90 366,483.69 193,253.62 366,282.25 193,417.31 366,592.50 193,694.96 367,118.75 193,828.56 367,371.97 193,533.08 544,214.00
HARGA SATUAN DASAR BAHAN KABUPATEN SITUBONDO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97 210,543.52 403,538.21
2 Agregat Pecah Mesin 20-30 mm M3 249,032.96 249,032.96 248,781.27 248,781.27 248,419.37 248,419.37 248,282.83 248,282.83 248,493.13 248,493.13 248,849.85 248,849.85 249,021.49 249,021.49 248,641.87 476,559.41
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 295,224.55 295,224.55 294,926.18 294,926.18 294,497.16 294,497.16 294,335.29 294,335.29 294,584.60 294,584.60 295,007.48 295,007.48 295,210.96 295,210.96 294,760.92 564,953.50
4 Bahan Agr. Base Kelas A M3 226,941.32 226,941.32 226,711.96 226,711.96 226,382.17 226,382.17 226,257.74 226,257.74 226,449.39 226,449.39 226,774.46 226,774.46 226,930.88 226,930.88 226,584.93 434,283.98
5 Bahan Agr. Base Kelas B M3 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
6 Bahan Agr. Base Kelas C M3 235,978.81 235,978.81 235,740.32 235,740.32 235,397.39 235,397.39 235,268.01 235,268.01 235,467.28 235,467.28 235,805.30 235,805.30 235,967.95 235,967.95 235,608.22 451,578.48
7 Bahan Agr. Base Kelas C2 M3 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 343,968.29
8 Bahan Agr. Base Kelas S M3 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
9 Bahan Pilihan M3 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 220,985.21
10 Bahan Tanah Timbunan M3 102,922.91 102,922.91 102,818.89 102,818.89 102,669.32 102,669.32 102,612.89 102,612.89 102,699.81 102,699.81 102,847.23 102,847.23 102,918.17 102,918.17 102,761.28 196,957.39
11 Batu Belah/Kerakal M3 290,203.73 290,203.73 289,910.43 289,910.43 289,488.71 289,488.71 289,329.59 289,329.59 289,574.66 289,574.66 289,990.35 289,990.35 290,190.37 290,190.37 289,747.98 555,345.45
12 Batu Kali M3 320,328.68 320,328.68 320,004.94 320,004.94 319,539.44 319,539.44 319,363.81 319,363.81 319,634.31 319,634.31 320,093.15 320,093.15 320,313.94 320,313.94 319,825.63 612,993.76
13 Chipping M3 190,791.38 190,791.38 190,598.55 190,598.55 190,321.29 190,321.29 190,216.69 190,216.69 190,377.80 190,377.80 190,651.09 190,651.09 190,782.60 190,782.60 190,491.75 365,106.00
14 Chipping (kg) Kg 240.00 240.00 239.75 239.75 239.40 239.40 239.27 239.27 239.48 239.48 239.82 239.82 239.98 239.98 239.62 459.26
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 342,420.32 342,420.32 342,074.25 342,074.25 341,576.64 341,576.64 341,388.90 341,388.90 341,678.06 341,678.06 342,168.54 342,168.54 342,404.55 342,404.55 341,882.57 655,269.19
18 Kapur M3 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
19 Pasir Beton (Kasar) M3 214,891.34 214,891.34 214,674.16 214,674.16 214,361.88 214,361.88 214,244.06 214,244.06 214,425.52 214,425.52 214,733.34 214,733.34 214,881.45 214,881.45 214,553.87 411,224.66
20 Pasir Halus (untuk HRS) M3 257,066.28 257,066.28 256,806.47 256,806.47 256,432.90 256,432.90 256,291.96 256,291.96 256,509.04 256,509.04 256,877.26 256,877.26 257,054.45 257,054.45 256,662.57 491,932.30
21 Pasir Pasang (Sedang) M3 288,195.40 288,195.40 287,904.13 287,904.13 287,485.32 287,485.32 287,327.31 287,327.31 287,570.68 287,570.68 287,983.49 287,983.49 288,182.13 288,182.13 287,742.81 551,502.23
22 Pasir Urug M3 174,724.74 174,724.74 174,548.15 174,548.15 174,294.24 174,294.24 174,198.44 174,198.44 174,345.99 174,345.99 174,596.26 174,596.26 174,716.69 174,716.69 174,450.34 334,360.23
23 Pasir Urug (ada unsur lempung) M3 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
24 Sirtu M3 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
26 Anti Pengelupas Liter 86,358.20 86,358.20 86,270.92 86,270.92 86,145.43 86,145.43 86,098.08 86,098.08 86,171.01 86,171.01 86,294.71 86,294.71 86,354.23 86,354.23 86,222.58 165,258.51
27 Arbocell Kg 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 232,514.88
28 Asbuton Curah Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
31 Aspal Minyak (Drum) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
34 Aspal Modifikasi (Retona) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
37 Assetilline Botol 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 255,574.20
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
40 Beton B-0 M3 506,035.92 506,035.92 505,524.49 505,524.49 504,789.11 504,789.11 504,511.66 504,511.66 504,938.99 504,938.99 505,663.84 505,663.84 506,012.62 506,012.62 505,241.22 968,370.54
41 Beton K-125 (fc' 10 MPa) M3 523,189.68 523,189.68 522,660.91 522,660.91 521,900.61 521,900.61 521,613.75 521,613.75 522,055.56 522,055.56 522,804.98 522,804.98 523,165.59 523,165.59 522,368.04 1,001,196.66
42 Beton K-175 (fc' 15 MPa) M3 566,074.08 566,074.08 565,501.97 565,501.97 564,679.35 564,679.35 564,368.98 564,368.98 564,847.00 564,847.00 565,657.85 565,657.85 566,048.02 566,048.02 565,185.09 1,083,261.96
43 Beton K-250 (fc' 20 MPa) M3 630,400.68 630,400.68 629,763.56 629,763.56 628,847.45 628,847.45 628,501.82 628,501.82 629,034.16 629,034.16 629,937.15 629,937.15 630,371.66 630,371.66 629,410.67 1,206,359.91
44 Beton K-300 (fc' 25 MPa) M3 656,131.32 656,131.32 655,468.19 655,468.19 654,514.70 654,514.70 654,154.95 654,154.95 654,709.03 654,709.03 655,648.87 655,648.87 656,101.11 656,101.11 655,100.91 1,255,599.09
45 Beton K-350 (fc' 30 MPa) M3 681,861.96 681,861.96 681,172.83 681,172.83 680,181.94 680,181.94 679,808.09 679,808.09 680,383.89 680,383.89 681,360.59 681,360.59 681,830.57 681,830.57 680,791.14 1,304,838.27
46 Beton K-400 (fc' 35 MPa) M3 707,592.60 707,592.60 706,877.46 706,877.46 705,849.18 705,849.18 705,461.22 705,461.22 706,058.76 706,058.76 707,072.31 707,072.31 707,560.02 707,560.02 706,481.37 1,354,077.45
47 Beton K-450 (fc' 40 MPa) M3 741,900.12 741,900.12 741,150.31 741,150.31 740,072.17 740,072.17 739,665.40 739,665.40 740,291.91 740,291.91 741,354.61 741,354.61 741,865.96 741,865.96 740,735.01 1,419,729.69
48 Beton K-500 (fc' 45 MPa) M3 771,919.20 771,919.20 771,139.05 771,139.05 770,017.29 770,017.29 769,594.06 769,594.06 770,245.92 770,245.92 771,351.61 771,351.61 771,883.66 771,883.66 770,706.95 1,477,175.40
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
51 Cat Anti Karat Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
52 Cat Marka (Non Thermoplas) Kg 55,749.72 55,749.72 55,693.38 55,693.38 55,612.36 55,612.36 55,581.79 55,581.79 55,628.87 55,628.87 55,708.73 55,708.73 55,747.15 55,747.15 55,662.17 106,684.89
53 Cat Marka (Thermoplastic) Kg 38,081.35 38,081.35 38,042.86 38,042.86 37,987.52 37,987.52 37,966.64 37,966.64 37,998.80 37,998.80 38,053.35 38,053.35 38,079.59 38,079.59 38,021.54 72,873.99
54 Cerucuk Diameter 10-15 cm M' 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
55 Cold Mix (Aspal Dingin) Kg 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,119,644.14 1,119,644.14 1,118,512.57 1,118,512.57 1,116,885.49 1,116,885.49 1,116,271.61 1,116,271.61 1,117,217.10 1,117,217.10 1,118,820.89 1,118,820.89 1,119,592.60 1,119,592.60 1,117,885.82 2,142,595.75
57 Curing Compound Liter 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 523,170.04 523,170.04 522,641.30 522,641.30 521,881.02 521,881.02 521,594.18 521,594.18 522,035.97 522,035.97 522,785.36 522,785.36 523,145.96 523,145.96 522,348.44 1,001,159.09
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 608,524.08 608,524.08 607,909.07 607,909.07 607,024.76 607,024.76 606,691.12 606,691.12 607,204.99 607,204.99 608,076.64 608,076.64 608,496.07 608,496.07 607,568.43 1,164,495.99
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 772,203.00 772,203.00 771,422.57 771,422.57 770,300.40 770,300.40 769,877.01 769,877.01 770,529.11 770,529.11 771,635.21 771,635.21 772,167.45 772,167.45 770,990.31 1,477,718.51
61 Kerosen/Minyak Tanah Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
62 Minyak Fluks Liter 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
63 Minyak Pelumas/Olie Liter 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
64 Oxygen (Isi 6 M3) Botol 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48 147,380.46 282,476.75
65 Polytene 125 Mikron Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
66 Sand Sheet Ton 1,183,910.71 1,183,910.71 1,182,714.18 1,182,714.18 1,180,993.72 1,180,993.72 1,180,344.60 1,180,344.60 1,181,344.36 1,181,344.36 1,183,040.20 1,183,040.20 1,183,856.21 1,183,856.21 1,182,051.46 2,265,578.83
67 Seal Coat M2 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
68 Seal Guard Kg 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
69 Semen/PC (50 kg) Zak 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
70 Semen/PC (kg) Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12 1,002.59 1,921.61
71 Slurry Seal Ton 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
75 Baja Prategang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
77 Baja Tulangan (Polos) U25 Kg 10,041.65 8,033.32 10,031.50 8,025.20 10,016.91 8,013.53 10,011.40 8,009.12 10,019.88 8,015.91 10,034.27 8,027.41 10,041.19 8,032.95 10,025.88 17,210.93
78 Baja Tulangan (Polos) U32 Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
81 Baja Tulangan (Ulir) D19 Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
84 Baja Tulangan (Ulir) D36 Kg 9,037.49 10,041.65 9,028.35 10,031.50 9,015.22 10,016.91 9,010.26 10,011.40 9,017.90 10,019.88 9,030.84 10,034.27 9,037.07 10,041.19 9,023.29 18,297.08
85 Besi Beton Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,150,249.83 11,150,249.83 11,138,980.75 11,138,980.75 11,122,777.14 11,122,777.14 11,116,663.63 11,116,663.63 11,126,079.58 11,126,079.58 11,142,051.22 11,142,051.22 11,149,736.56 11,149,736.56 11,132,739.11 21,337,563.45
87 Box Culvert Type DUB 200×200 M' 11,836,094.63 11,836,094.63 11,824,132.39 11,824,132.39 11,806,932.11 11,806,932.11 11,800,442.56 11,800,442.56 11,810,437.68 11,810,437.68 11,827,391.72 11,827,391.72 11,835,549.79 11,835,549.79 11,817,506.84 22,650,023.45
88 Box Culvert Type uk 300×200 M' 12,780,009.87 12,780,009.87 12,767,093.66 12,767,093.66 12,748,521.67 12,748,521.67 12,741,514.59 12,741,514.59 12,752,306.81 12,752,306.81 12,770,612.92 12,770,612.92 12,779,421.58 12,779,421.58 12,759,939.72 24,456,337.36
89 Casing M2 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
90 Ducting (Kabel Prestress) M' 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
91 Ducting (Strand Prestress) M' 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 276,711.92
92 Expansion Cap M2 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
93 Expansion Join Baja Siku M' 1,866,743.02 1,866,743.02 1,864,856.38 1,864,856.38 1,862,143.61 1,862,143.61 1,861,120.11 1,861,120.11 1,862,696.50 1,862,696.50 1,865,370.43 1,865,370.43 1,866,657.08 1,866,657.08 1,863,811.42 3,572,274.00
94 Expansion Join Tipe Rubber M' 1,351,606.29 1,351,606.29 1,350,240.28 1,350,240.28 1,348,276.12 1,348,276.12 1,347,535.05 1,347,535.05 1,348,676.43 1,348,676.43 1,350,612.48 1,350,612.48 1,351,544.08 1,351,544.08 1,349,483.69 2,586,487.79
95 Expansion Join Tipe Torma M' 1,549,426.83 1,549,426.83 1,547,860.89 1,547,860.89 1,545,609.25 1,545,609.25 1,544,759.72 1,544,759.72 1,546,068.15 1,546,068.15 1,548,287.56 1,548,287.56 1,549,355.50 1,549,355.50 1,546,993.56 2,965,045.07
96 Expansion Tipe Joint Asphaltic Plug M' 1,838,626.39 1,838,626.39 1,836,768.17 1,836,768.17 1,834,096.27 1,834,096.27 1,833,088.18 1,833,088.18 1,834,640.82 1,834,640.82 1,837,274.48 1,837,274.48 1,838,541.75 1,838,541.75 1,835,738.95 3,518,468.90
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21 27,069.88 51,883.48
99 Glass Bead Kg 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
100 Joint Sealent Kg 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
101 Joint Socket Pile 16×16×16 Set 78,324.88 78,324.88 78,245.72 78,245.72 78,131.90 78,131.90 78,088.96 78,088.96 78,155.10 78,155.10 78,267.29 78,267.29 78,321.28 78,321.28 78,201.88 149,885.62
102 Joint Socket Pile 35×35 Set 670,782.32 670,782.32 670,104.39 670,104.39 669,129.60 669,129.60 668,761.82 668,761.82 669,328.27 669,328.27 670,289.10 670,289.10 670,751.44 670,751.44 669,728.90 1,283,635.84
103 Kawat Beton Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
104 Kawat Bronjong Kg 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
105 Kawat Las Dos 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 295,928.02
106 Kayu Acuan (Kelas III/Meranti) M3 3,688,298.60 3,688,298.60 3,684,570.99 3,684,570.99 3,679,211.13 3,679,211.13 3,677,188.90 3,677,188.90 3,680,303.52 3,680,303.52 3,685,586.65 3,685,586.65 3,688,128.82 3,688,128.82 3,682,506.37 7,058,075.52
107 Kayu Perancah (Gelam) M3 2,375,854.75 2,375,854.75 2,373,453.57 2,373,453.57 2,370,000.96 2,370,000.96 2,368,698.32 2,368,698.32 2,370,704.64 2,370,704.64 2,374,107.82 2,374,107.82 2,375,745.38 2,375,745.38 2,372,123.63 4,546,530.54
108 Kerb Pracetak Type 1 (Peninggi) Buah 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 81,337.38 81,337.38 81,255.17 81,255.17 81,136.97 81,136.97 81,092.38 81,092.38 81,161.06 81,161.06 81,277.57 81,277.57 81,333.63 81,333.63 81,209.64 155,650.45
110 Marmer Nama Jembatan Buah 514,132.56 514,132.56 513,612.95 513,612.95 512,865.80 512,865.80 512,583.91 512,583.91 513,018.08 513,018.08 513,754.52 513,754.52 514,108.89 514,108.89 513,325.15 983,864.60
111 Mata Kucing Buah 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 259,417.42
112 Matras Concrete (Tebal=10 cm) M2 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 240,201.32
113 Mini Pile 16×16×16 M' 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 222,906.82
114 Mini Timber Pile Buah 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21 27,069.88 51,883.48
115 Multipleks 12 mm Lbr 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 81,337.38 81,337.38 81,255.17 81,255.17 81,136.97 81,136.97 81,092.38 81,092.38 81,161.06 81,161.06 81,277.57 81,277.57 81,333.63 81,333.63 81,209.64 155,650.45
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 57,017,501.43 57,017,501.43 56,959,876.23 56,959,876.23 56,877,018.08 56,877,018.08 56,845,756.24 56,845,756.24 56,893,905.30 56,893,905.30 56,975,577.28 56,975,577.28 57,014,876.78 57,014,876.78 56,927,959.25 109,110,968.15
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 80,775,044.73 80,775,044.73 80,693,408.79 80,693,408.79 80,576,026.03 80,576,026.03 80,531,738.30 80,531,738.30 80,599,949.68 80,599,949.68 80,715,652.01 80,715,652.01 80,771,326.46 80,771,326.46 80,648,192.91 154,574,351.95
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 154,383,362.78 154,383,362.78 154,227,334.00 154,227,334.00 154,002,983.21 154,002,983.21 153,918,337.16 153,918,337.16 154,048,707.90 154,048,707.90 154,269,846.93 154,269,846.93 154,376,256.14 154,376,256.14 154,140,914.01 295,434,169.46
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 202,449,736.05 202,449,736.05 202,245,128.61 202,245,128.61 201,950,927.50 201,950,927.50 201,839,927.38 201,839,927.38 202,010,888.29 202,010,888.29 202,300,877.69 202,300,877.69 202,440,416.81 202,440,416.81 202,131,802.26 387,415,901.24
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 258,070,443.76 258,070,443.76 257,809,622.80 257,809,622.80 257,434,593.35 257,434,593.35 257,293,097.25 257,293,097.25 257,511,027.68 257,511,027.68 257,880,688.30 257,880,688.30 258,058,564.16 258,058,564.16 257,665,161.35 493,853,909.13
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 311,361,488.31 311,361,488.31 311,046,808.34 311,046,808.34 310,594,336.04 310,594,336.04 310,423,621.26 310,423,621.26 310,686,553.91 310,686,553.91 311,132,548.72 311,132,548.72 311,347,155.60 311,347,155.60 310,872,515.87 595,833,780.56
124 Pelat Rambu (Eng. Grade) Buah 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 343,968.29
125 Pelat Rambu (High L Grade) Buah 209,870.52 209,870.52 209,658.41 209,658.41 209,353.42 209,353.42 209,238.36 209,238.36 209,415.58 209,415.58 209,716.20 209,716.20 209,860.86 209,860.86 209,540.93 401,616.60
126 Pemantul Cahaya (Reflector) Buah 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
127 Pipa Baja D10" Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
128 Pipa Drainase Baja Dia 3" M' 235,978.81 235,978.81 235,740.32 235,740.32 235,397.39 235,397.39 235,268.01 235,268.01 235,467.28 235,467.28 235,805.30 235,805.30 235,967.95 235,967.95 235,608.22 451,578.48
129 Pipa Galvanis Dia 1,5" M' 93,387.36 93,387.36 93,292.98 93,292.98 93,157.27 93,157.27 93,106.06 93,106.06 93,184.92 93,184.92 93,318.69 93,318.69 93,383.06 93,383.06 93,240.70 178,709.78
130 Pipa Galvanis Dia 2" M' 270,120.43 270,120.43 269,847.43 269,847.43 269,454.89 269,454.89 269,306.78 269,306.78 269,534.89 269,534.89 269,921.81 269,921.81 270,107.99 270,107.99 269,696.22 516,913.24
131 Pipa Galvanis Dia 3" M' 206,858.02 206,858.02 206,648.96 206,648.96 206,348.35 206,348.35 206,234.93 206,234.93 206,409.62 206,409.62 206,705.92 206,705.92 206,848.50 206,848.50 206,533.16 395,851.77
132 Pipa Porus M' 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
133 Pipa PVC Dia 4" M' 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89 100,258.82 192,161.05
134 Plastik Filter M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
135 Rel Pengaman M' 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,761,305.67 1,761,305.67 1,759,525.60 1,759,525.60 1,756,966.06 1,756,966.06 1,756,000.36 1,756,000.36 1,757,487.71 1,757,487.71 1,760,010.61 1,760,010.61 1,761,224.60 1,761,224.60 1,758,539.66 3,370,504.89
137 Strip Bearing Buah 270,120.43 270,120.43 269,847.43 269,847.43 269,454.89 269,454.89 269,306.78 269,306.78 269,534.89 269,534.89 269,921.81 269,921.81 270,107.99 270,107.99 269,696.22 516,913.24
138 Tiang Pancang Baja Diameter 400 M' 624,590.72 624,590.72 623,959.48 623,959.48 623,051.82 623,051.82 622,709.36 622,709.36 623,236.81 623,236.81 624,131.47 624,131.47 624,561.97 624,561.97 623,609.85 1,195,241.76
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 763,165.51 763,165.51 762,394.22 762,394.22 761,285.18 761,285.18 760,866.75 760,866.75 761,511.21 761,511.21 762,604.37 762,604.37 763,130.38 763,130.38 761,967.01 1,460,424.01
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,595,618.42 1,595,618.42 1,594,005.80 1,594,005.80 1,591,687.04 1,591,687.04 1,590,812.18 1,590,812.18 1,592,159.62 1,592,159.62 1,594,445.19 1,594,445.19 1,595,544.97 1,595,544.97 1,593,112.61 3,053,439.15
HARGA SATUAN DASAR UPAH KABUPATEN JEMBER TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
2 Tukang OH 104,000 104,000 104,281.39 104,281.39 104,425.15 104,425.15 104,428.06 104,428.06 104,290.13 104,290.13 104,141.16 104,141.16 104,118.62 104,118.62 104,240.85 104,240.85 104,392.45 104,392.45
3 Mandor OH 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
4 Operator OH 246,000 246,000 246,665.59 246,665.59 247,005.64 247,005.64 247,012.52 247,012.52 246,686.28 246,686.28 246,333.91 246,333.91 246,280.58 246,280.58 246,569.70 246,569.70 246,928.29 246,928.29
5 Pembantu Operator OH 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
6 Sopir OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
7 Pembantu Sopir OH 100,000 100,000 100,270.57 100,270.57 100,408.80 100,408.80 100,411.59 100,411.59 100,278.97 100,278.97 100,135.73 100,135.73 100,114.06 100,114.06 100,231.58 100,231.58 100,377.35 100,377.35
8 Mekanik OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
9 Pembantu Mekanik OH 100,000 100,000 100,270.57 100,270.57 100,408.80 100,408.80 100,411.59 100,411.59 100,278.97 100,278.97 100,135.73 100,135.73 100,114.06 100,114.06 100,231.58 100,231.58 100,377.35 100,377.35
10 Kepala Tukang OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
11 Pemasak Aspal OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96

HARGA SATUAN DASAR ALAT KABUPATEN JEMBER TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 362,423 405,000 363,403.25 406,095.79 363,904.24 406,655.63 363,914.37 406,666.95 363,433.73 406,129.84 362,914.59 405,549.72 362,836.03 405,461.93 363,261.98 405,937.91 363,790.28 406,528.29
2 Asphalt Distribution Unit/Jam 223,148 287,000 223,751.47 287,776.52 224,059.93 288,173.25 224,066.17 288,181.27 223,770.24 287,800.66 223,450.60 287,389.56 223,402.23 287,327.34 223,664.49 287,664.65 223,989.77 288,083.01
3 Asphalt Finisher Unit/Jam 163,898 777,170 164,341.60 779,272.75 164,568.16 780,347.05 164,572.74 780,368.77 164,355.38 779,338.10 164,120.61 778,224.88 164,085.08 778,056.42 164,277.71 778,969.80 164,516.62 780,102.69
4 Asphalt Liquid Mixer Unit/Jam 58,480 107,000 58,638.32 107,289.50 58,719.16 107,437.41 58,720.79 107,440.40 58,643.23 107,298.50 58,559.47 107,145.24 58,546.79 107,122.04 58,615.52 107,247.79 58,700.77 107,403.77
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 78,486 78,486 78,698.79 78,698.79 78,807.29 78,807.29 78,809.48 78,809.48 78,705.39 78,705.39 78,592.97 78,592.97 78,575.96 78,575.96 78,668.20 78,668.20 78,782.61 78,782.61
6 Asphalt Mixing Plant Unit/Jam 877,201 5,850,309 879,574.75 5,866,137.91 880,787.33 5,874,224.90 880,811.84 5,874,388.42 879,648.51 5,866,629.83 878,392.01 5,858,249.86 878,201.86 5,856,981.70 879,232.81 5,863,857.38 880,511.51 5,872,385.42
7 Asphalt Sprayer Unit/Jam 72,331 80,549 72,526.34 80,766.94 72,626.32 80,878.28 72,628.35 80,880.53 72,532.42 80,773.71 72,428.82 80,658.33 72,413.14 80,640.87 72,498.14 80,735.54 72,603.58 80,852.96
8 Asphalt Tanker Unit/Jam 338,569 392,000 339,484.99 393,060.62 339,953.00 393,602.48 339,962.47 393,613.44 339,513.46 393,093.58 339,028.50 392,532.08 338,955.10 392,447.10 339,353.01 392,907.81 339,846.55 393,479.23
9 Blending Equipment Unit/Jam 110,035 174,000 110,332.62 174,470.78 110,484.73 174,711.31 110,487.80 174,716.17 110,341.87 174,485.41 110,184.26 174,236.18 110,160.41 174,198.46 110,289.73 174,402.96 110,450.13 174,656.60
10 Bore Pile Machine Unit/Jam 303,173 527,000 303,993.38 528,425.88 304,412.46 529,154.36 304,420.94 529,169.09 304,018.87 528,470.19 303,584.61 527,715.32 303,518.89 527,601.08 303,875.20 528,220.45 304,317.14 528,988.66
11 Bore Pile Machine Dia 60 Unit/Jam 198,525 600,000 199,061.65 601,623.39 199,336.08 602,452.78 199,341.63 602,469.55 199,078.35 601,673.84 198,793.98 600,814.40 198,750.95 600,684.34 198,984.27 601,389.50 199,273.66 602,264.13
12 Bore Pile Machine Dia 80 Unit/Jam 784,864 784,864 786,987.94 786,987.94 788,072.87 788,072.87 788,094.81 788,094.81 787,053.93 787,053.93 785,929.70 785,929.70 785,759.56 785,759.56 786,681.99 786,681.99 787,826.09 787,826.09
13 Bulldozer 100-150 HP Unit/Jam 307,790 488,001 308,622.72 489,321.36 309,048.18 489,995.93 309,056.79 490,009.57 308,648.60 489,362.40 308,207.72 488,663.38 308,141.00 488,557.60 308,502.74 489,131.13 308,951.41 489,842.49
14 Cement Tanker Unit/Jam 286,245 369,000 287,019.13 369,998.39 287,414.81 370,508.46 287,422.81 370,518.78 287,043.20 370,029.41 286,633.18 369,500.86 286,571.13 369,420.87 286,907.55 369,854.54 287,324.81 370,392.44
15 Cold Milling Unit/Jam 447,065 1,392,365 448,274.50 1,396,132.26 448,892.49 1,398,056.95 448,904.98 1,398,095.87 448,312.09 1,396,249.33 447,671.72 1,394,254.91 447,574.81 1,393,953.09 448,100.23 1,395,589.49 448,751.92 1,397,619.16
16 Cold Recycler Unit/Jam 3,765,041 3,765,041 3,775,227.43 3,775,227.43 3,780,431.92 3,780,431.92 3,780,537.15 3,780,537.15 3,775,544.02 3,775,544.02 3,770,150.98 3,770,150.98 3,769,334.84 3,769,334.84 3,773,759.77 3,773,759.77 3,779,248.09 3,779,248.09
17 Compressor 4000-6500 L\M Unit/Jam 114,652 153,838 114,961.96 154,254.23 115,120.45 154,466.89 115,123.65 154,471.19 114,971.60 154,267.17 114,807.38 154,046.81 114,782.52 154,013.46 114,917.27 154,194.26 115,084.40 154,418.51
18 Concrete Breaker Unit/Jam 417,825 796,000 418,955.34 798,153.70 419,532.91 799,254.03 419,544.59 799,276.27 418,990.48 798,220.63 418,391.98 797,080.44 418,301.41 796,907.90 418,792.47 797,843.41 419,401.54 799,003.74
19 Concrete Mixer (350) Unit/Jam 77,717 77,717 77,927.24 77,927.24 78,034.67 78,034.67 78,036.84 78,036.84 77,933.77 77,933.77 77,822.45 77,822.45 77,805.60 77,805.60 77,896.94 77,896.94 78,010.23 78,010.23
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 88,490 88,490 88,729.03 88,729.03 88,851.35 88,851.35 88,853.83 88,853.83 88,736.47 88,736.47 88,609.72 88,609.72 88,590.54 88,590.54 88,694.54 88,694.54 88,823.53 88,823.53
21 Concrete Pan Mixer Unit/Jam 235,459 504,000 236,096.38 505,363.65 236,421.86 506,060.34 236,428.44 506,074.43 236,116.18 505,406.03 235,778.91 504,684.10 235,727.87 504,574.85 236,004.60 505,167.18 236,347.83 505,901.87
22 Concrete Pump Unit/Jam 179,288 244,351 179,772.73 245,012.13 180,020.57 245,349.90 180,025.58 245,356.73 179,787.81 245,032.68 179,531.00 244,682.67 179,492.14 244,629.70 179,702.85 244,916.88 179,964.19 245,273.07
23 Concrete Vibrator Unit/Jam 66,944 66,944 67,125.44 67,125.44 67,217.98 67,217.98 67,219.85 67,219.85 67,131.07 67,131.07 67,035.18 67,035.18 67,020.67 67,020.67 67,099.35 67,099.35 67,196.93 67,196.93
24 Crane 10-15 Ton Unit/Jam 240,076 381,050 240,725.72 382,080.99 241,057.58 382,607.72 241,064.29 382,618.37 240,745.91 382,113.03 240,402.02 381,567.21 240,349.98 381,484.62 240,632.14 381,932.45 240,982.10 382,487.91
25 Crane On Track 35 Ton Unit/Jam 199,294 443,283 199,833.21 444,482.37 200,108.70 445,095.13 200,114.27 445,107.52 199,849.97 444,519.64 199,564.50 443,884.69 199,521.30 443,788.60 199,755.52 444,309.57 200,046.04 444,955.75
26 Crane On Track 75-100 Ton Unit/Jam 313,176 475,000 314,023.62 476,285.19 314,456.53 476,941.79 314,465.28 476,955.06 314,049.95 476,325.13 313,601.36 475,644.74 313,533.47 475,541.77 313,901.54 476,100.02 314,358.06 476,792.43
27 Dump Truck 10 Ton Unit/Jam 296,248 350,122 297,049.37 351,069.31 297,458.88 351,553.29 297,467.16 351,563.08 297,074.28 351,098.75 296,649.93 350,597.23 296,585.72 350,521.34 296,933.89 350,932.83 297,365.73 351,443.20
28 Dump Truck 3-4 M3 Unit/Jam 161,590 257,240 162,026.93 257,936.00 162,250.30 258,291.59 162,254.81 258,298.78 162,040.52 257,957.63 161,809.05 257,589.16 161,774.03 257,533.40 161,963.94 257,835.73 162,199.49 258,210.71
29 Excavator 80-140 HP Unit/Jam 233,920 450,756 234,553.27 451,975.59 234,876.62 452,598.68 234,883.16 452,611.28 234,572.94 452,013.49 234,237.87 451,367.83 234,187.16 451,270.12 234,462.08 451,799.88 234,803.07 452,456.95
30 Flat Bed Truck 3-4 M3 Unit/Jam 283,936 379,000 284,704.46 380,025.44 285,096.95 380,549.34 285,104.89 380,559.93 284,728.33 380,057.31 284,321.63 379,514.43 284,260.08 379,432.28 284,593.78 379,877.70 285,007.67 380,430.17
31 Fulvi Mixer Unit/Jam 710,995 1,110,000 712,918.48 1,113,003.28 713,901.31 1,114,537.65 713,921.18 1,114,568.67 712,978.27 1,113,096.61 711,959.84 1,111,506.65 711,805.72 1,111,266.04 712,641.33 1,112,570.58 713,677.75 1,114,188.64
32 Generator Set Unit/Jam 316,254 545,818 317,109.85 547,294.79 317,547.01 548,049.29 317,555.85 548,064.54 317,136.44 547,340.69 316,683.44 546,558.86 316,614.88 546,440.54 316,986.57 547,082.03 317,447.57 547,877.67
33 Hot Recycler Unit/Jam 2,323,045 6,812,161 2,329,329.98 6,830,592.35 2,332,541.17 6,840,008.92 2,332,606.10 6,840,199.33 2,329,525.32 6,831,165.15 2,326,197.79 6,821,407.42 2,325,694.23 6,819,930.76 2,328,424.43 6,827,936.87 2,331,810.75 6,837,867.01
34 Jack Hammer Unit/Jam 43,860 43,860 43,978.74 43,978.74 44,039.37 44,039.37 44,040.59 44,040.59 43,982.43 43,982.43 43,919.60 43,919.60 43,910.09 43,910.09 43,961.64 43,961.64 44,025.58 44,025.58
35 Launching Gantry Unit/Jam 55,816,938 55,816,938 55,967,958.84 55,967,958.84 56,045,115.62 56,045,115.62 56,046,675.78 56,046,675.78 55,972,652.23 55,972,652.23 55,892,700.16 55,892,700.16 55,880,600.82 55,880,600.82 55,946,200.62 55,946,200.62 56,027,565.41 56,027,565.41
36 Motor Grader > 100 HP Unit/Jam 219,300 523,816 219,893.69 525,233.26 220,196.83 525,957.35 220,202.96 525,971.99 219,912.13 525,277.31 219,598.00 524,527.00 219,550.47 524,413.45 219,808.20 525,029.07 220,127.88 525,792.64
37 Pedestrian Roller Unit/Jam 72,331 72,331 72,526.34 72,526.34 72,626.32 72,626.32 72,628.35 72,628.35 72,532.42 72,532.42 72,428.82 72,428.82 72,413.14 72,413.14 72,498.14 72,498.14 72,603.58 72,603.58
38 Pile Driver + Hammer Unit/Jam 82,334 255,956 82,556.58 256,648.53 82,670.39 257,002.34 82,672.69 257,009.50 82,563.50 256,670.05 82,445.57 256,303.42 82,427.72 256,247.94 82,524.48 256,548.75 82,644.50 256,921.86
39 Rock Drill Breaker Unit/Jam 80,025 260,000 80,241.91 260,703.47 80,352.53 261,062.87 80,354.76 261,070.14 80,248.64 260,725.33 80,134.01 260,352.91 80,116.66 260,296.55 80,210.71 260,602.12 80,327.37 260,981.12
40 Split Form Paver Unit/Jam 169,284 169,284 169,742.50 169,742.50 169,976.50 169,976.50 169,981.23 169,981.23 169,756.73 169,756.73 169,514.25 169,514.25 169,477.55 169,477.55 169,676.51 169,676.51 169,923.27 169,923.27
41 Stone Crusher Unit/Jam 453,221 717,136 454,446.96 719,076.32 455,073.45 720,067.63 455,086.12 720,087.68 454,485.07 719,136.62 453,835.87 718,109.40 453,737.63 717,953.95 454,270.28 718,796.77 454,930.95 719,842.15
42 Tamper Unit/Jam 67,714 67,714 67,897.00 67,897.00 67,990.60 67,990.60 67,992.49 67,992.49 67,902.69 67,902.69 67,805.70 67,805.70 67,791.02 67,791.02 67,870.60 67,870.60 67,969.31 67,969.31
43 Tandem Roller 6-8 T Unit/Jam 327,027 382,000 327,911.64 383,033.56 328,363.70 383,561.61 328,372.84 383,572.28 327,939.14 383,065.68 327,470.71 382,518.50 327,399.82 382,435.70 327,784.16 382,884.65 328,260.87 383,441.50
44 Three Wheel Roller 6-8 T Unit/Jam 108,496 186,242 108,789.51 186,745.91 108,939.49 187,003.35 108,942.52 187,008.56 108,798.63 186,761.57 108,643.22 186,494.79 108,619.70 186,454.42 108,747.22 186,673.31 108,905.37 186,944.79
45 Tire Roller 8-10 T Unit/Jam 193,908 350,000 194,432.31 350,946.98 194,700.36 351,430.79 194,705.78 351,440.57 194,448.62 350,976.41 194,170.87 350,475.07 194,128.83 350,399.20 194,356.73 350,810.54 194,639.39 351,320.74
46 Track Loader 75-100 HP Unit/Jam 181,596 417,136 182,087.41 418,264.63 182,338.43 418,841.24 182,343.50 418,852.90 182,102.67 418,299.70 181,842.56 417,702.20 181,803.19 417,611.77 182,016.62 418,102.02 182,281.33 418,710.08
47 Trailer 20 Ton Unit/Jam 293,170 451,789 293,963.14 453,011.38 294,368.40 453,635.90 294,376.59 453,648.53 293,987.79 453,049.37 293,567.86 452,402.23 293,504.31 452,304.30 293,848.86 452,835.27 294,276.22 453,493.85
48 Trailler 15 Ton Unit/Jam 253,927 386,276 254,613.74 387,321.13 254,964.75 387,855.09 254,971.85 387,865.88 254,635.10 387,353.61 254,271.37 386,800.31 254,216.33 386,716.58 254,514.76 387,170.55 254,884.91 387,733.63
49 Truck Mixer (agitator) Unit/Jam 319,332 469,000 320,196.07 470,268.95 320,637.49 470,917.26 320,646.42 470,930.37 320,222.92 470,308.39 319,765.51 469,636.59 319,696.29 469,534.93 320,071.59 470,086.13 320,537.09 470,769.79
50 Vibrating Rammer Unit/Jam 65,405 65,405 65,582.33 65,582.33 65,672.74 65,672.74 65,674.57 65,674.57 65,587.83 65,587.83 65,494.14 65,494.14 65,479.96 65,479.96 65,556.83 65,556.83 65,652.17 65,652.17
51 Vibratory Roller 5-8 T Unit/Jam 157,742 297,252 158,169.14 298,056.26 158,387.19 298,467.16 158,391.60 298,475.47 158,182.41 298,081.26 157,956.46 297,655.47 157,922.26 297,591.04 158,107.65 297,940.39 158,337.60 298,373.69
52 Water Pump 70-100 MM Unit/Jam 49,246 49,246 49,379.64 49,379.64 49,447.71 49,447.71 49,449.09 49,449.09 49,383.78 49,383.78 49,313.24 49,313.24 49,302.56 49,302.56 49,360.44 49,360.44 49,432.23 49,432.23
53 Water Tanker 3000-4500 L Unit/Jam 178,518 223,838 179,001.18 224,443.63 179,247.95 224,753.04 179,252.94 224,759.30 179,016.19 224,462.45 178,760.48 224,141.82 178,721.78 224,093.30 178,931.59 224,356.37 179,191.82 224,682.66
54 Welding Set Unit/Jam 100,032 100,032 100,302.38 100,302.38 100,440.66 100,440.66 100,443.46 100,443.46 100,310.80 100,310.80 100,167.51 100,167.51 100,145.83 100,145.83 100,263.39 100,263.39 100,409.21 100,409.21
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 173,901 428,992 174,371.84 430,152.70 174,612.22 430,745.71 174,617.08 430,757.70 174,386.46 430,188.78 174,137.36 429,574.29 174,099.67 429,481.30 174,304.05 429,985.48 174,557.55 430,610.82
HARGA SATUAN DASAR BAHAN KABUPATEN JEMBER TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 242,000 242,000 242,654.77 242,654.77 242,989.29 242,989.29 242,996.05 242,996.05 242,675.12 242,675.12 242,328.48 242,328.48 242,276.02 242,276.02 242,560.43 242,560.43 242,913.20 242,913.20
2 Agregat Pecah Mesin 20-30 mm M3 233,700 233,700 234,332.31 234,332.31 234,655.36 234,655.36 234,661.89 234,661.89 234,351.96 234,351.96 234,017.21 234,017.21 233,966.55 233,966.55 234,241.21 234,241.21 234,581.88 234,581.88
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 265,000 265,000 265,717.00 265,717.00 266,083.31 266,083.31 266,090.72 266,090.72 265,739.28 265,739.28 265,359.70 265,359.70 265,302.25 265,302.25 265,613.70 265,613.70 265,999.99 265,999.99
4 Bahan Agr. Base Kelas A M3 254,000 254,000 254,687.24 254,687.24 255,038.34 255,038.34 255,045.44 255,045.44 254,708.59 254,708.59 254,344.76 254,344.76 254,289.71 254,289.71 254,588.22 254,588.22 254,958.48 254,958.48
5 Bahan Agr. Base Kelas B M3 239,000 239,000 239,646.65 239,646.65 239,977.03 239,977.03 239,983.71 239,983.71 239,666.75 239,666.75 239,324.40 239,324.40 239,272.60 239,272.60 239,553.49 239,553.49 239,901.88 239,901.88
6 Bahan Agr. Base Kelas C M3 219,000 219,000 219,592.54 219,592.54 219,895.27 219,895.27 219,901.39 219,901.39 219,610.95 219,610.95 219,297.26 219,297.26 219,249.79 219,249.79 219,507.17 219,507.17 219,826.41 219,826.41
7 Bahan Agr. Base Kelas C2 M3 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
8 Bahan Agr. Base Kelas S M3 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
9 Bahan Pilihan M3 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
10 Bahan Tanah Timbunan M3 110,000 110,000 110,297.62 110,297.62 110,449.68 110,449.68 110,452.75 110,452.75 110,306.87 110,306.87 110,149.31 110,149.31 110,125.46 110,125.46 110,254.74 110,254.74 110,415.09 110,415.09
11 Batu Belah/Kerakal M3 261,000 261,000 261,706.18 261,706.18 262,066.96 262,066.96 262,074.26 262,074.26 261,728.12 261,728.12 261,354.27 261,354.27 261,297.69 261,297.69 261,604.43 261,604.43 261,984.90 261,984.90
12 Batu Kali M3 287,000 287,000 287,776.52 287,776.52 288,173.25 288,173.25 288,181.27 288,181.27 287,800.66 287,800.66 287,389.56 287,389.56 287,327.34 287,327.34 287,664.65 287,664.65 288,083.01 288,083.01
13 Chipping M3 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
14 Chipping (kg) Kg 241 241 241.65 241.65 241.99 241.99 241.99 241.99 241.67 241.67 241.33 241.33 241.27 241.27 241.56 241.56 241.91 241.91
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 5,000 5,000 5,013.53 5,013.53 5,020.44 5,020.44 5,020.58 5,020.58 5,013.95 5,013.95 5,006.79 5,006.79 5,005.70 5,005.70 5,011.58 5,011.58 5,018.87 5,018.87
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
18 Kapur M3 77,000 77,000 77,208.34 77,208.34 77,314.77 77,314.77 77,316.93 77,316.93 77,214.81 77,214.81 77,104.52 77,104.52 77,087.82 77,087.82 77,178.32 77,178.32 77,290.56 77,290.56
19 Pasir Beton (Kasar) M3 366,000 366,000 366,990.27 366,990.27 367,496.20 367,496.20 367,506.43 367,506.43 367,021.04 367,021.04 366,496.79 366,496.79 366,417.45 366,417.45 366,847.60 366,847.60 367,381.12 367,381.12
20 Pasir Halus (untuk HRS) M3 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
21 Pasir Pasang (Sedang) M3 258,000 258,000 258,698.06 258,698.06 259,054.70 259,054.70 259,061.91 259,061.91 258,719.75 258,719.75 258,350.19 258,350.19 258,294.27 258,294.27 258,597.49 258,597.49 258,973.58 258,973.58
22 Pasir Urug M3 157,000 157,000 157,424.79 157,424.79 157,641.81 157,641.81 157,646.20 157,646.20 157,437.99 157,437.99 157,213.10 157,213.10 157,179.07 157,179.07 157,363.59 157,363.59 157,592.45 157,592.45
23 Pasir Urug (ada unsur lempung) M3 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
24 Sirtu M3 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 54,000 54,000 54,146.11 54,146.11 54,220.75 54,220.75 54,222.26 54,222.26 54,150.65 54,150.65 54,073.30 54,073.30 54,061.59 54,061.59 54,125.06 54,125.06 54,203.77 54,203.77
26 Anti Pengelupas Liter 77,000 77,000 77,208.34 77,208.34 77,314.77 77,314.77 77,316.93 77,316.93 77,214.81 77,214.81 77,104.52 77,104.52 77,087.82 77,087.82 77,178.32 77,178.32 77,290.56 77,290.56
27 Arbocell Kg 109,000 109,000 109,294.92 109,294.92 109,445.59 109,445.59 109,448.64 109,448.64 109,304.08 109,304.08 109,147.95 109,147.95 109,124.32 109,124.32 109,252.43 109,252.43 109,411.32 109,411.32
28 Asbuton Curah Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,500 8,500 8,523.00 8,523.00 8,534.75 8,534.75 8,534.99 8,534.99 8,523.71 8,523.71 8,511.54 8,511.54 8,509.69 8,509.69 8,519.68 8,519.68 8,532.08 8,532.08
30 Aspal Emulsi (CSS-1) Kg 9,425 9,425 9,450.50 9,450.50 9,463.53 9,463.53 9,463.79 9,463.79 9,451.29 9,451.29 9,437.79 9,437.79 9,435.75 9,435.75 9,446.83 9,446.83 9,460.57 9,460.57
31 Aspal Minyak (Drum) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
32 Aspal Modifikasi (BNA) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
33 Aspal Modifikasi (JAP-57) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
34 Aspal Modifikasi (Retona) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
35 Aspal Modifikasi (Starbit) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
36 Aspal Minyak (Curah) Kg 7,020 7,020 7,038.99 7,038.99 7,048.70 7,048.70 7,048.89 7,048.89 7,039.58 7,039.58 7,029.53 7,029.53 7,028.01 7,028.01 7,036.26 7,036.26 7,046.49 7,046.49
37 Assetilline Botol 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
38 Bahan Pengawet: Kreosot Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
39 Bensin Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
40 Beton B-0 M3 453,990 453,990 455,218.51 455,218.51 455,846.07 455,846.07 455,858.76 455,858.76 455,256.69 455,256.69 454,606.39 454,606.39 454,507.98 454,507.98 455,041.54 455,041.54 455,703.33 455,703.33
41 Beton K-125 (fc' 10 MPa) M3 469,380 469,380 470,649.65 470,649.65 471,298.48 471,298.48 471,311.60 471,311.60 470,689.12 470,689.12 470,016.78 470,016.78 469,915.03 469,915.03 470,466.68 470,466.68 471,150.90 471,150.90
42 Beton K-175 (fc' 15 MPa) M3 507,853 507,853 509,227.49 509,227.49 509,929.50 509,929.50 509,943.70 509,943.70 509,270.19 509,270.19 508,542.74 508,542.74 508,432.66 508,432.66 509,029.52 509,029.52 509,769.82 509,769.82
43 Beton K-250 (fc' 20 MPa) M3 565,564 565,564 567,094.25 567,094.25 567,876.04 567,876.04 567,891.85 567,891.85 567,141.80 567,141.80 566,331.69 566,331.69 566,209.10 566,209.10 566,873.78 566,873.78 567,698.21 567,698.21
44 Beton K-300 (fc' 25 MPa) M3 588,648 588,648 590,240.95 590,240.95 591,054.65 591,054.65 591,071.11 591,071.11 590,290.45 590,290.45 589,447.27 589,447.27 589,319.67 589,319.67 590,011.49 590,011.49 590,869.57 590,869.57
45 Beton K-350 (fc' 30 MPa) M3 611,733 611,733 613,387.66 613,387.66 614,233.27 614,233.27 614,250.37 614,250.37 613,439.10 613,439.10 612,562.85 612,562.85 612,430.25 612,430.25 613,149.20 613,149.20 614,040.92 614,040.92
46 Beton K-400 (fc' 35 MPa) M3 634,817 634,817 636,534.36 636,534.36 637,411.88 637,411.88 637,429.62 637,429.62 636,587.74 636,587.74 635,678.43 635,678.43 635,540.82 635,540.82 636,286.90 636,286.90 637,212.28 637,212.28
47 Beton K-450 (fc' 40 MPa) M3 665,596 665,596 667,396.63 667,396.63 668,316.70 668,316.70 668,335.30 668,335.30 667,452.60 667,452.60 666,499.20 666,499.20 666,354.92 666,354.92 667,137.18 667,137.18 668,107.42 668,107.42
48 Beton K-500 (fc' 45 MPa) M3 692,527 692,527 694,401.12 694,401.12 695,358.41 695,358.41 695,377.77 695,377.77 694,459.35 694,459.35 693,467.38 693,467.38 693,317.26 693,317.26 694,131.16 694,131.16 695,140.67 695,140.67
49 Bunker Oil Liter 3,000 3,000 3,008.12 3,008.12 3,012.26 3,012.26 3,012.35 3,012.35 3,008.37 3,008.37 3,004.07 3,004.07 3,003.42 3,003.42 3,006.95 3,006.95 3,011.32 3,011.32
50 Cat Kg 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
51 Cat Anti Karat Kg 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
52 Cat Marka (Non Thermoplas) Kg 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
53 Cat Marka (Thermoplastic) Kg 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
54 Cerucuk Diameter 10-15 cm M' 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
55 Cold Mix (Aspal Dingin) Kg 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,004,000 1,004,000 1,006,716.48 1,006,716.48 1,008,104.32 1,008,104.32 1,008,132.39 1,008,132.39 1,006,800.90 1,006,800.90 1,005,362.77 1,005,362.77 1,005,145.13 1,005,145.13 1,006,325.10 1,006,325.10 1,007,788.64 1,007,788.64
57 Curing Compound Liter 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 469,000 469,000 470,268.95 470,268.95 470,917.26 470,917.26 470,930.37 470,930.37 470,308.39 470,308.39 469,636.59 469,636.59 469,534.93 469,534.93 470,086.13 470,086.13 470,769.79 470,769.79
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 546,000 546,000 547,477.29 547,477.29 548,232.03 548,232.03 548,247.29 548,247.29 547,523.20 547,523.20 546,741.11 546,741.11 546,622.75 546,622.75 547,264.45 547,264.45 548,060.36 548,060.36
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 693,000 693,000 694,875.02 694,875.02 695,832.96 695,832.96 695,852.33 695,852.33 694,933.29 694,933.29 693,940.64 693,940.64 693,790.42 693,790.42 694,604.88 694,604.88 695,615.07 695,615.07
61 Kerosen/Minyak Tanah Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
62 Minyak Fluks Liter 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
63 Minyak Pelumas/Olie Liter 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
64 Oxygen (Isi 6 M3) Botol 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
65 Polytene 125 Mikron Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
66 Sand Sheet Ton 1,062,000 1,062,000 1,064,873.40 1,064,873.40 1,066,341.43 1,066,341.43 1,066,371.11 1,066,371.11 1,064,962.70 1,064,962.70 1,063,441.50 1,063,441.50 1,063,211.29 1,063,211.29 1,064,459.42 1,064,459.42 1,066,007.51 1,066,007.51
67 Seal Coat M2 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
68 Seal Guard Kg 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
69 Semen/PC (50 kg) Zak 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
70 Semen/PC (kg) Kg 1,550 1,550 1,554.19 1,554.19 1,556.34 1,556.34 1,556.38 1,556.38 1,554.32 1,554.32 1,552.10 1,552.10 1,551.77 1,551.77 1,553.59 1,553.59 1,555.85 1,555.85
71 Slurry Seal Ton 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
72 Solar Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
73 Thinner Liter 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
75 Baja Prategang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
77 Baja Tulangan (Polos) U25 Kg 15,600 15,600 15,642.21 15,642.21 15,663.77 15,663.77 15,664.21 15,664.21 15,643.52 15,643.52 15,621.17 15,621.17 15,617.79 15,617.79 15,636.13 15,636.13 15,658.87 15,658.87
78 Baja Tulangan (Polos) U32 Kg 15,600 15,600 15,642.21 15,642.21 15,663.77 15,663.77 15,664.21 15,664.21 15,643.52 15,643.52 15,621.17 15,621.17 15,617.79 15,617.79 15,636.13 15,636.13 15,658.87 15,658.87
79 Baja Tulangan (Polos) U36 Kg 15,600 15,600 15,642.21 15,642.21 15,663.77 15,663.77 15,664.21 15,664.21 15,643.52 15,643.52 15,621.17 15,621.17 15,617.79 15,617.79 15,636.13 15,636.13 15,658.87 15,658.87
80 Baja Tulangan (Ulir) D16 Kg 12,674 12,674 12,708.29 12,708.29 12,725.81 12,725.81 12,726.17 12,726.17 12,709.36 12,709.36 12,691.20 12,691.20 12,688.46 12,688.46 12,703.35 12,703.35 12,721.83 12,721.83
81 Baja Tulangan (Ulir) D19 Kg 12,674 12,674 12,708.29 12,708.29 12,725.81 12,725.81 12,726.17 12,726.17 12,709.36 12,709.36 12,691.20 12,691.20 12,688.46 12,688.46 12,703.35 12,703.35 12,721.83 12,721.83
82 Baja Tulangan (Ulir) D24 Kg 12,674 12,674 12,708.29 12,708.29 12,725.81 12,725.81 12,726.17 12,726.17 12,709.36 12,709.36 12,691.20 12,691.20 12,688.46 12,688.46 12,703.35 12,703.35 12,721.83 12,721.83
83 Baja Tulangan (Ulir) D32 Kg 12,674 12,674 12,708.29 12,708.29 12,725.81 12,725.81 12,726.17 12,726.17 12,709.36 12,709.36 12,691.20 12,691.20 12,688.46 12,688.46 12,703.35 12,703.35 12,721.83 12,721.83
84 Baja Tulangan (Ulir) D36 Kg 12,674 12,674 12,708.29 12,708.29 12,725.81 12,725.81 12,726.17 12,726.17 12,709.36 12,709.36 12,691.20 12,691.20 12,688.46 12,688.46 12,703.35 12,703.35 12,721.83 12,721.83
85 Besi Beton Kg 12,674 12,674 12,708.29 12,708.29 12,725.81 12,725.81 12,726.17 12,726.17 12,709.36 12,709.36 12,691.20 12,691.20 12,688.46 12,688.46 12,703.35 12,703.35 12,721.83 12,721.83
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,003,000 10,003,000 10,030,064.65 10,030,064.65 10,043,891.98 10,043,891.98 10,044,171.58 10,044,171.58 10,030,905.76 10,030,905.76 10,016,577.48 10,016,577.48 10,014,409.15 10,014,409.15 10,026,165.34 10,026,165.34 10,040,746.79 10,040,746.79
87 Box Culvert Type DUB 200×200 M' 10,619,000 10,619,000 10,647,731.33 10,647,731.33 10,662,410.17 10,662,410.17 10,662,706.99 10,662,706.99 10,648,624.24 10,648,624.24 10,633,413.60 10,633,413.60 10,631,111.74 10,631,111.74 10,643,591.90 10,643,591.90 10,659,071.30 10,659,071.30
88 Box Culvert Type uk 300×200 M' 11,465,000 11,465,000 11,496,020.32 11,496,020.32 11,511,868.60 11,511,868.60 11,512,189.06 11,512,189.06 11,496,984.35 11,496,984.35 11,480,561.91 11,480,561.91 11,478,076.66 11,478,076.66 11,491,551.10 11,491,551.10 11,508,263.72 11,508,263.72
89 Casing M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
90 Ducting (Kabel Prestress) M' 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
91 Ducting (Strand Prestress) M' 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
92 Expansion Cap M2 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
93 Expansion Join Baja Siku M' 1,674,000 1,674,000 1,678,529.26 1,678,529.26 1,680,843.26 1,680,843.26 1,680,890.06 1,680,890.06 1,678,670.02 1,678,670.02 1,676,272.19 1,676,272.19 1,675,909.32 1,675,909.32 1,677,876.72 1,677,876.72 1,680,316.92 1,680,316.92
94 Expansion Join Tipe Rubber M' 1,212,000 1,212,000 1,215,279.25 1,215,279.25 1,216,954.62 1,216,954.62 1,216,988.50 1,216,988.50 1,215,381.16 1,215,381.16 1,213,645.10 1,213,645.10 1,213,382.37 1,213,382.37 1,214,806.80 1,214,806.80 1,216,573.54 1,216,573.54
95 Expansion Join Tipe Torma M' 1,390,000 1,390,000 1,393,760.86 1,393,760.86 1,395,682.28 1,395,682.28 1,395,721.13 1,395,721.13 1,393,877.74 1,393,877.74 1,391,886.70 1,391,886.70 1,391,585.40 1,391,585.40 1,393,219.02 1,393,219.02 1,395,245.23 1,395,245.23
96 Expansion Tipe Joint Asphaltic Plug M' 1,649,000 1,649,000 1,653,461.62 1,653,461.62 1,655,741.07 1,655,741.07 1,655,787.16 1,655,787.16 1,653,600.28 1,653,600.28 1,651,238.25 1,651,238.25 1,650,880.80 1,650,880.80 1,652,818.82 1,652,818.82 1,655,222.58 1,655,222.58
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
99 Glass Bead Kg 54,000 54,000 54,146.11 54,146.11 54,220.75 54,220.75 54,222.26 54,222.26 54,150.65 54,150.65 54,073.30 54,073.30 54,061.59 54,061.59 54,125.06 54,125.06 54,203.77 54,203.77
100 Joint Sealent Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
101 Joint Socket Pile 16×16×16 Set 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
102 Joint Socket Pile 35×35 Set 602,000 602,000 603,628.80 603,628.80 604,460.96 604,460.96 604,477.79 604,477.79 603,679.42 603,679.42 602,817.12 602,817.12 602,686.62 602,686.62 603,394.14 603,394.14 604,271.68 604,271.68
103 Kawat Beton Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
104 Kawat Bronjong Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
105 Kawat Las Dos 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
106 Kayu Acuan (Kelas III/Meranti) M3 3,309,000 3,309,000 3,317,953.01 3,317,953.01 3,322,527.10 3,322,527.10 3,322,619.59 3,322,619.59 3,318,231.25 3,318,231.25 3,313,491.44 3,313,491.44 3,312,774.15 3,312,774.15 3,316,663.11 3,316,663.11 3,321,486.67 3,321,486.67
107 Kayu Perancah (Gelam) M3 2,131,445 2,131,445 2,137,211.95 2,137,211.95 2,140,158.29 2,140,158.29 2,140,217.86 2,140,217.86 2,137,391.17 2,137,391.17 2,134,338.10 2,134,338.10 2,133,876.07 2,133,876.07 2,136,381.08 2,136,381.08 2,139,488.11 2,139,488.11
108 Kerb Pracetak Type 1 (Peninggi) Buah 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
110 Marmer Nama Jembatan Buah 462,000 462,000 463,250.01 463,250.01 463,888.64 463,888.64 463,901.56 463,901.56 463,288.86 463,288.86 462,627.09 462,627.09 462,526.94 462,526.94 463,069.92 463,069.92 463,743.38 463,743.38
111 Mata Kucing Buah 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
112 Matras Concrete (Tebal=10 cm) M2 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
113 Mini Pile 16×16×16 M' 104,000 104,000 104,281.39 104,281.39 104,425.15 104,425.15 104,428.06 104,428.06 104,290.13 104,290.13 104,141.16 104,141.16 104,118.62 104,118.62 104,240.85 104,240.85 104,392.45 104,392.45
114 Mini Timber Pile Buah 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
115 Multipleks 12 mm Lbr 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
116 Paku Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
117 Paving Block (Model Bata 8 cm) M2 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 51,153,000 51,153,000 51,291,402.28 51,291,402.28 51,362,112.02 51,362,112.02 51,363,541.81 51,363,541.81 51,295,703.51 51,295,703.51 51,222,432.05 51,222,432.05 51,211,343.70 51,211,343.70 51,271,462.13 51,271,462.13 51,346,028.26 51,346,028.26
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 72,467,000 72,467,000 72,663,070.58 72,663,070.58 72,763,243.05 72,763,243.05 72,765,268.60 72,765,268.60 72,669,164.00 72,669,164.00 72,565,362.41 72,565,362.41 72,549,653.86 72,549,653.86 72,634,821.94 72,634,821.94 72,740,457.64 72,740,457.64
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 138,505,000 138,505,000 138,879,746.51 138,879,746.51 139,071,204.53 139,071,204.53 139,075,075.92 139,075,075.92 138,891,392.76 138,891,392.76 138,692,998.48 138,692,998.48 138,662,974.98 138,662,974.98 138,825,755.34 138,825,755.34 139,027,655.15 139,027,655.15
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 181,628,000 181,628,000 182,119,422.40 182,119,422.40 182,370,490.13 182,370,490.13 182,375,566.87 182,375,566.87 182,134,694.67 182,134,694.67 181,874,531.08 181,874,531.08 181,835,159.89 181,835,159.89 182,048,621.28 182,048,621.28 182,313,381.83 182,313,381.83
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 231,528,000 231,528,000 232,154,434.50 232,154,434.50 232,474,479.92 232,474,479.92 232,480,951.43 232,480,951.43 232,173,902.63 232,173,902.63 231,842,262.38 231,842,262.38 231,792,074.45 231,792,074.45 232,064,181.67 232,064,181.67 232,401,681.83 232,401,681.83
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 279,338,000 279,338,000 280,093,791.78 280,093,791.78 280,479,925.85 280,479,925.85 280,487,733.72 280,487,733.72 280,117,280.04 280,117,280.04 279,717,156.84 279,717,156.84 279,656,605.22 279,656,605.22 279,984,901.96 279,984,901.96 280,392,095.12 280,392,095.12
124 Pelat Rambu (Eng. Grade) Buah 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
125 Pelat Rambu (High L Grade) Buah 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
126 Pemantul Cahaya (Reflector) Buah 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
127 Pipa Baja D10" Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
128 Pipa Drainase Baja Dia 3" M' 212,000 212,000 212,573.60 212,573.60 212,866.65 212,866.65 212,872.58 212,872.58 212,591.42 212,591.42 212,287.76 212,287.76 212,241.80 212,241.80 212,490.96 212,490.96 212,799.99 212,799.99
129 Pipa Galvanis Dia 1,5" M' 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
130 Pipa Galvanis Dia 2" M' 242,000 242,000 242,654.77 242,654.77 242,989.29 242,989.29 242,996.05 242,996.05 242,675.12 242,675.12 242,328.48 242,328.48 242,276.02 242,276.02 242,560.43 242,560.43 242,913.20 242,913.20
131 Pipa Galvanis Dia 3" M' 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
132 Pipa Porus M' 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
133 Pipa PVC Dia 4" M' 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
134 Plastik Filter M2 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
135 Rel Pengaman M' 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,581,000 1,581,000 1,585,277.64 1,585,277.64 1,587,463.08 1,587,463.08 1,587,507.27 1,587,507.27 1,585,410.58 1,585,410.58 1,583,145.96 1,583,145.96 1,582,803.25 1,582,803.25 1,584,661.34 1,584,661.34 1,586,965.98 1,586,965.98
137 Strip Bearing Buah 242,000 242,000 242,654.77 242,654.77 242,989.29 242,989.29 242,996.05 242,996.05 242,675.12 242,675.12 242,328.48 242,328.48 242,276.02 242,276.02 242,560.43 242,560.43 242,913.20 242,913.20
138 Tiang Pancang Baja Diameter 400 M' 560,000 560,000 561,515.17 561,515.17 562,289.26 562,289.26 562,304.92 562,304.92 561,562.25 561,562.25 560,760.11 560,760.11 560,638.72 560,638.72 561,296.87 561,296.87 562,113.19 562,113.19
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 684,000 684,000 685,850.67 685,850.67 686,796.17 686,796.17 686,815.29 686,815.29 685,908.18 685,908.18 684,928.42 684,928.42 684,780.15 684,780.15 685,584.03 685,584.03 686,581.11 686,581.11
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,431,000 1,431,000 1,434,871.79 1,434,871.79 1,436,849.89 1,436,849.89 1,436,889.89 1,436,889.89 1,434,992.12 1,434,992.12 1,432,942.35 1,432,942.35 1,432,632.16 1,432,632.16 1,434,313.97 1,434,313.97 1,436,399.95 1,436,399.95
HARGA SATUAN DASAR UPAH KABUPATEN JEMBER TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 92,238.11
2 Tukang OH 104,433.18 104,433.18 104,327.63 104,327.63 104,175.87 104,175.87 104,118.61 104,118.61 104,206.80 104,206.80 104,356.39 104,356.39 104,428.37 104,428.37 104,269.17 104,269.17
3 Mandor OH 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 119,307.99
4 Operator OH 247,024.63 247,024.63 246,774.97 246,774.97 246,415.99 246,415.99 246,280.55 246,280.55 246,489.15 246,489.15 246,842.99 246,842.99 247,013.26 247,013.26 246,636.69 246,636.69
5 Pembantu Operator OH 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 154,398.58
6 Sopir OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
7 Pembantu Sopir OH 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89 100,258.82 100,258.82
8 Mekanik OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76
9 Pembantu Mekanik OH 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89 100,258.82 100,258.82
10 Kepala Tukang OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
11 Pemasak Aspal OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64

HARGA SATUAN DASAR ALAT KABUPATEN JEMBER TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 363,932.21 406,686.89 363,564.40 406,275.86 363,035.53 405,684.87 362,835.99 405,461.88 363,143.32 405,805.32 363,664.61 406,387.86 363,915.46 406,668.17 363,360.68 739,122.74
2 Asphalt Distribution Unit/Jam 224,077.16 288,195.40 223,850.69 287,904.13 223,525.06 287,485.32 223,402.20 287,327.31 223,591.43 287,570.68 223,912.40 287,983.49 224,066.84 288,182.13 223,725.26 492,820.54
3 Asphalt Finisher Unit/Jam 164,580.81 780,407.03 164,414.47 779,618.31 164,175.30 778,484.21 164,085.07 778,056.33 164,224.05 778,715.35 164,459.79 779,833.21 164,573.23 780,371.11 164,322.34 929,807.52
4 Asphalt Liquid Mixer Unit/Jam 58,723.67 107,445.67 58,664.32 107,337.08 58,578.98 107,180.94 58,546.78 107,122.03 58,596.37 107,212.76 58,680.49 107,366.67 58,720.97 107,440.73 58,631.45 161,021.45
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 78,813.34 78,813.34 78,733.69 78,733.69 78,619.16 78,619.16 78,575.95 78,575.95 78,642.50 78,642.50 78,755.39 78,755.39 78,809.72 78,809.72 78,689.57 150,820.36
6 Asphalt Mixing Plant Unit/Jam 880,855.03 5,874,676.42 879,964.78 5,868,739.13 878,684.72 5,860,202.02 878,201.76 5,856,981.02 878,945.61 5,861,941.96 880,207.35 5,870,356.85 880,814.48 5,874,405.99 879,471.70 6,671,618.29
7 Asphalt Sprayer Unit/Jam 72,631.91 80,884.50 72,558.50 80,802.75 72,452.95 80,685.21 72,413.13 80,640.86 72,474.46 80,709.17 72,578.50 80,825.03 72,628.56 80,880.78 72,517.84 147,230.95
8 Asphalt Tanker Unit/Jam 339,979.13 393,632.74 339,635.53 393,234.91 339,141.47 392,662.88 338,955.07 392,447.06 339,242.16 392,779.47 339,729.15 393,343.31 339,963.48 393,614.62 339,445.22 704,167.00
9 Blending Equipment Unit/Jam 110,493.22 174,724.74 110,381.55 174,548.15 110,220.98 174,294.24 110,160.40 174,198.44 110,253.70 174,345.99 110,411.97 174,596.26 110,488.13 174,716.69 110,319.70 275,574.88
10 Bore Pile Machine Unit/Jam 304,435.86 529,195.03 304,128.18 528,660.20 303,685.77 527,891.17 303,518.85 527,601.02 303,775.94 528,047.91 304,212.01 528,805.93 304,421.85 529,170.67 303,957.76 806,986.83
11 Bore Pile Machine Dia 60 Unit/Jam 199,351.40 602,499.09 199,149.92 601,890.17 198,860.23 601,014.61 198,750.92 600,684.27 198,919.27 601,193.06 199,204.82 602,056.08 199,342.22 602,471.36 199,038.33 784,001.38
12 Bore Pile Machine Dia 80 Unit/Jam 788,133.45 788,133.45 787,336.91 787,336.91 786,191.59 786,191.59 785,759.47 785,759.47 786,425.02 786,425.02 787,553.94 787,553.94 788,097.17 788,097.17 786,895.73 1,508,203.64
13 Bulldozer 100-150 HP Unit/Jam 309,071.94 490,033.60 308,759.57 489,538.34 308,310.43 488,826.22 308,140.97 488,557.54 308,401.97 488,971.36 308,844.68 489,673.28 309,057.71 490,011.04 308,586.56 772,129.88
14 Cement Tanker Unit/Jam 287,436.90 370,536.94 287,146.40 370,162.45 286,728.70 369,623.99 286,571.10 369,420.83 286,813.83 369,733.73 287,225.56 370,264.49 287,423.67 370,519.88 286,985.50 633,020.27
15 Cold Milling Unit/Jam 448,926.99 1,398,164.41 448,473.28 1,396,751.34 447,820.90 1,394,719.52 447,574.76 1,393,952.93 447,953.86 1,395,133.63 448,596.90 1,397,136.36 448,906.33 1,398,100.05 448,221.98 1,806,831.33
16 Cold Recycler Unit/Jam 3,780,722.50 3,780,722.50 3,776,901.48 3,776,901.48 3,771,407.31 3,771,407.31 3,769,334.40 3,769,334.40 3,772,527.07 3,772,527.07 3,777,942.59 3,777,942.59 3,780,548.46 3,780,548.46 3,774,785.13 7,234,941.58
17 Compressor 4000-6500 L\M Unit/Jam 115,129.30 154,478.76 115,012.94 154,322.63 114,845.63 154,098.14 114,782.51 154,013.45 114,879.73 154,143.90 115,044.64 154,365.17 115,124.00 154,471.65 114,948.49 259,603.69
18 Concrete Breaker Unit/Jam 419,565.16 799,315.46 419,141.12 798,507.63 418,531.41 797,346.06 418,301.37 796,907.80 418,655.67 797,582.79 419,256.66 798,727.73 419,545.84 799,278.67 418,906.26 1,182,050.57
19 Concrete Mixer (350) Unit/Jam 78,040.66 78,040.66 77,961.79 77,961.79 77,848.38 77,848.38 77,805.59 77,805.59 77,871.50 77,871.50 77,983.28 77,983.28 78,037.07 78,037.07 77,918.11 149,341.73
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 88,858.18 88,858.18 88,768.38 88,768.38 88,639.25 88,639.25 88,590.53 88,590.53 88,665.57 88,665.57 88,792.85 88,792.85 88,854.09 88,854.09 88,718.64 170,042.57
21 Concrete Pan Mixer Unit/Jam 236,440.03 506,099.24 236,201.07 505,587.74 235,857.48 504,852.28 235,727.84 504,574.79 235,927.51 505,002.17 236,266.18 505,727.11 236,429.15 506,075.94 236,068.72 721,696.81
22 Concrete Pump Unit/Jam 180,034.40 245,368.76 179,852.45 245,120.77 179,590.82 244,764.20 179,492.11 244,629.67 179,644.15 244,836.88 179,902.03 245,188.34 180,026.12 245,357.46 179,751.67 409,752.78
23 Concrete Vibrator Unit/Jam 67,223.15 67,223.15 67,155.21 67,155.21 67,057.52 67,057.52 67,020.66 67,020.66 67,077.43 67,077.43 67,173.72 67,173.72 67,220.05 67,220.05 67,117.58 128,640.90
24 Crane 10-15 Ton Unit/Jam 241,076.11 382,637.13 240,832.47 382,250.42 240,482.13 381,694.36 240,349.96 381,484.57 240,553.54 381,807.69 240,898.85 382,355.78 241,065.02 382,619.52 240,697.52 602,671.58
25 Crane On Track 35 Ton Unit/Jam 200,124.08 445,129.34 199,921.82 444,679.47 199,631.00 444,032.60 199,521.28 443,788.54 199,690.27 444,164.44 199,976.93 444,802.04 200,114.87 445,108.85 199,809.80 627,585.93
26 Crane On Track 75-100 Ton Unit/Jam 314,480.70 476,978.45 314,162.87 476,496.38 313,705.86 475,803.24 313,533.44 475,541.72 313,799.00 475,944.51 314,249.47 476,627.73 314,466.22 476,956.49 313,986.83 764,045.38
27 Dump Truck 10 Ton Unit/Jam 297,481.74 351,580.31 297,181.09 351,224.98 296,748.79 350,714.06 296,585.68 350,521.30 296,836.89 350,818.19 297,263.01 351,321.80 297,468.05 351,564.13 297,014.57 623,286.55
28 Dump Truck 3-4 M3 Unit/Jam 162,262.77 258,311.44 162,098.78 258,050.38 161,862.97 257,675.00 161,774.01 257,533.37 161,911.03 257,751.50 162,143.46 258,121.51 162,255.30 258,299.55 162,007.95 406,410.35
29 Excavator 80-140 HP Unit/Jam 234,894.67 452,633.47 234,657.28 452,176.01 234,315.93 451,518.24 234,187.14 451,270.07 234,385.50 451,652.30 234,721.96 452,300.65 234,883.86 452,612.63 234,525.79 666,900.68
30 Flat Bed Truck 3-4 M3 Unit/Jam 285,118.86 380,578.59 284,830.71 380,193.96 284,416.37 379,640.90 284,260.04 379,432.23 284,500.82 379,753.62 284,909.22 380,298.76 285,105.74 380,561.07 284,671.10 640,924.66
31 Fulvi Mixer Unit/Jam 713,956.18 1,114,623.32 713,234.61 1,113,496.81 712,197.09 1,111,877.04 711,805.64 1,111,265.91 712,408.55 1,112,207.16 713,431.22 1,113,803.75 713,923.31 1,114,572.01 712,834.96 1,766,292.98
32 Generator Set Unit/Jam 317,571.42 548,091.41 317,250.46 547,537.48 316,788.96 546,740.99 316,614.85 546,440.48 316,883.02 546,903.32 317,337.91 547,688.41 317,556.80 548,066.18 317,072.69 837,875.33
33 Hot Recycler Unit/Jam 2,332,720.46 6,840,534.68 2,330,362.88 6,833,621.24 2,326,972.96 6,823,680.53 2,325,693.96 6,819,929.97 2,327,663.85 6,825,706.54 2,331,005.25 6,835,504.93 2,332,613.08 6,840,219.79 2,329,057.08 8,964,722.05
34 Jack Hammer Unit/Jam 44,042.75 44,042.75 43,998.24 43,998.24 43,934.24 43,934.24 43,910.09 43,910.09 43,947.28 43,947.28 44,010.37 44,010.37 44,040.72 44,040.72 43,973.59 84,281.97
35 Launching Gantry Unit/Jam 56,049,423.52 56,049,423.52 55,992,776.72 55,992,776.72 55,911,325.38 55,911,325.38 55,880,594.33 55,880,594.33 55,927,925.89 55,927,925.89 56,008,211.19 56,008,211.19 56,046,843.43 56,046,843.43 55,961,401.64 107,258,415.60
36 Motor Grader > 100 HP Unit/Jam 220,213.76 525,997.77 219,991.20 525,466.17 219,671.18 524,701.79 219,550.44 524,413.39 219,736.40 524,857.57 220,051.84 525,611.01 220,203.62 525,973.56 219,867.93 726,713.64
37 Pedestrian Roller Unit/Jam 72,631.91 72,631.91 72,558.50 72,558.50 72,452.95 72,452.95 72,413.13 72,413.13 72,474.46 72,474.46 72,578.50 72,578.50 72,628.56 72,628.56 72,517.84 138,991.32
38 Pile Driver + Hammer Unit/Jam 82,676.74 257,022.10 82,593.19 256,762.33 82,473.04 256,388.83 82,427.71 256,247.91 82,497.53 256,464.95 82,615.95 256,833.11 82,672.94 257,010.26 82,546.91 332,285.07
39 Rock Drill Breaker Unit/Jam 80,358.70 261,082.94 80,277.49 260,819.07 80,160.71 260,439.67 80,116.65 260,296.52 80,184.51 260,516.99 80,299.62 260,890.97 80,355.01 261,070.92 80,232.51 334,218.05
40 Split Form Paver Unit/Jam 169,989.57 169,989.57 169,817.77 169,817.77 169,570.74 169,570.74 169,477.53 169,477.53 169,621.08 169,621.08 169,864.58 169,864.58 169,981.74 169,981.74 169,722.61 325,298.82
41 Stone Crusher Unit/Jam 455,108.43 720,122.98 454,648.47 719,395.18 453,987.11 718,348.69 453,737.58 717,953.86 454,121.90 718,561.98 454,773.80 719,593.48 455,087.48 720,089.83 454,393.71 1,135,512.03
42 Tamper Unit/Jam 67,995.83 67,995.83 67,927.11 67,927.11 67,828.29 67,828.29 67,791.01 67,791.01 67,848.43 67,848.43 67,945.83 67,945.83 67,992.70 67,992.70 67,889.04 130,119.53
43 Tandem Roller 6-8 T Unit/Jam 328,388.94 383,591.09 328,057.05 383,203.41 327,579.83 382,645.97 327,399.78 382,435.65 327,677.09 382,759.58 328,147.48 383,309.04 328,373.82 383,573.43 327,873.22 683,533.64
44 Three Wheel Roller 6-8 T Unit/Jam 108,947.86 187,017.73 108,837.75 186,828.72 108,679.43 186,556.94 108,619.69 186,454.40 108,711.69 186,612.33 108,867.75 186,880.21 108,942.84 187,009.12 108,776.76 286,434.24
45 Tire Roller 8-10 T Unit/Jam 194,715.32 351,457.80 194,518.53 351,102.60 194,235.57 350,591.86 194,128.81 350,399.16 194,293.24 350,695.95 194,572.15 351,199.38 194,706.36 351,441.62 194,409.53 529,111.34
46 Track Loader 75-100 HP Unit/Jam 182,352.44 418,873.43 182,168.15 418,450.10 181,903.15 417,841.39 181,803.17 417,611.73 181,957.16 417,965.45 182,218.36 418,565.44 182,344.05 418,854.15 182,066.07 585,106.47
47 Trailer 20 Ton Unit/Jam 294,391.02 453,670.77 294,093.49 453,212.26 293,665.68 452,552.99 293,504.27 452,304.25 293,752.87 452,687.35 294,174.56 453,337.19 294,377.47 453,649.89 293,928.70 722,388.03
48 Trailler 15 Ton Unit/Jam 254,984.35 387,884.90 254,726.65 387,492.88 254,356.10 386,929.20 254,216.30 386,716.53 254,431.62 387,044.08 254,796.86 387,599.69 254,972.61 387,867.04 254,583.91 620,640.07
49 Truck Mixer (agitator) Unit/Jam 320,662.14 470,953.46 320,338.06 470,477.48 319,872.07 469,793.09 319,696.26 469,534.87 319,967.04 469,932.58 320,426.36 470,607.17 320,647.38 470,931.78 320,158.56 763,687.17
50 Vibrating Rammer Unit/Jam 65,677.79 65,677.79 65,611.41 65,611.41 65,515.97 65,515.97 65,479.96 65,479.96 65,535.42 65,535.42 65,629.50 65,629.50 65,674.76 65,674.76 65,574.64 125,683.64
51 Vibratory Roller 5-8 T Unit/Jam 158,399.37 298,490.10 158,239.28 298,188.43 158,009.09 297,754.66 157,922.25 297,591.00 158,056.01 297,843.07 158,282.90 298,270.62 158,392.08 298,476.36 158,150.61 442,990.09
52 Water Pump 70-100 MM Unit/Jam 49,451.51 49,451.51 49,401.53 49,401.53 49,329.67 49,329.67 49,302.56 49,302.56 49,344.31 49,344.31 49,415.15 49,415.15 49,449.23 49,449.23 49,373.85 94,632.39
53 Water Tanker 3000-4500 L Unit/Jam 179,261.72 224,770.32 179,080.55 224,543.15 178,820.05 224,216.52 178,721.76 224,093.28 178,873.14 224,283.09 179,129.92 224,605.05 179,253.47 224,759.97 178,980.21 388,479.52
54 Welding Set Unit/Jam 100,448.38 100,448.38 100,346.86 100,346.86 100,200.89 100,200.89 100,145.81 100,145.81 100,230.64 100,230.64 100,374.52 100,374.52 100,443.76 100,443.76 100,290.63 192,222.03
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 174,625.65 430,778.82 174,449.16 430,343.45 174,195.39 429,717.44 174,099.65 429,481.25 174,247.11 429,845.02 174,497.25 430,462.07 174,617.61 430,758.99 174,351.41 589,921.51
HARGA SATUAN DASAR BAHAN KABUPATEN JEMBER TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 243,007.97 243,007.97 242,762.37 242,762.37 242,409.23 242,409.23 242,275.99 242,275.99 242,481.20 242,481.20 242,829.29 242,829.29 242,996.78 242,996.78 242,626.34 465,029.75
2 Agregat Pecah Mesin 20-30 mm M3 234,673.40 234,673.40 234,436.22 234,436.22 234,095.19 234,095.19 233,966.52 233,966.52 234,164.70 234,164.70 234,500.84 234,500.84 234,662.59 234,662.59 234,304.86 449,080.38
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 266,103.76 266,103.76 265,834.83 265,834.83 265,448.12 265,448.12 265,302.22 265,302.22 265,526.94 265,526.94 265,908.10 265,908.10 266,091.52 266,091.52 265,685.87 509,226.79
4 Bahan Agr. Base Kelas A M3 255,057.95 255,057.95 254,800.17 254,800.17 254,429.52 254,429.52 254,289.68 254,289.68 254,505.06 254,505.06 254,870.41 254,870.41 255,046.21 255,046.21 254,657.40 488,089.08
5 Bahan Agr. Base Kelas B M3 239,995.47 239,995.47 239,752.92 239,752.92 239,404.15 239,404.15 239,272.57 239,272.57 239,475.24 239,475.24 239,819.01 239,819.01 239,984.42 239,984.42 239,618.57 459,264.92
6 Bahan Agr. Base Kelas C M3 219,912.17 219,912.17 219,689.91 219,689.91 219,370.33 219,370.33 219,249.76 219,249.76 219,435.47 219,435.47 219,750.47 219,750.47 219,902.04 219,902.04 219,566.81 420,832.71
7 Bahan Agr. Base Kelas C2 M3 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
8 Bahan Agr. Base Kelas S M3 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
9 Bahan Pilihan M3 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
10 Bahan Tanah Timbunan M3 110,458.17 110,458.17 110,346.53 110,346.53 110,186.01 110,186.01 110,125.45 110,125.45 110,218.73 110,218.73 110,376.95 110,376.95 110,453.08 110,453.08 110,284.70 211,377.16
11 Batu Belah/Kerakal M3 262,087.10 262,087.10 261,822.22 261,822.22 261,441.36 261,441.36 261,297.66 261,297.66 261,518.98 261,518.98 261,894.40 261,894.40 262,075.04 262,075.04 261,675.51 501,540.35
12 Batu Kali M3 288,195.40 288,195.40 287,904.13 287,904.13 287,485.32 287,485.32 287,327.31 287,327.31 287,570.68 287,570.68 287,983.49 287,983.49 288,182.13 288,182.13 287,742.81 551,502.23
13 Chipping M3 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
14 Chipping (kg) Kg 242.00 242.00 241.76 241.76 241.41 241.41 241.27 241.27 241.48 241.48 241.83 241.83 241.99 241.99 241.62 463.11
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 5,020.83 5,020.83 5,015.75 5,015.75 5,008.46 5,008.46 5,005.70 5,005.70 5,009.94 5,009.94 5,017.13 5,017.13 5,020.59 5,020.59 5,012.94 9,608.05
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
18 Kapur M3 77,320.72 77,320.72 77,242.57 77,242.57 77,130.21 77,130.21 77,087.82 77,087.82 77,153.11 77,153.11 77,263.86 77,263.86 77,317.16 77,317.16 77,199.29 147,964.01
19 Pasir Beton (Kasar) M3 367,524.45 367,524.45 367,153.00 367,153.00 366,618.92 366,618.92 366,417.41 366,417.41 366,727.77 366,727.77 367,254.21 367,254.21 367,507.53 367,507.53 366,947.27 703,309.46
20 Pasir Halus (untuk HRS) M3 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
21 Pasir Pasang (Sedang) M3 259,074.61 259,074.61 258,812.77 258,812.77 258,436.28 258,436.28 258,294.24 258,294.24 258,513.02 258,513.02 258,884.12 258,884.12 259,062.68 259,062.68 258,667.75 495,775.52
22 Pasir Urug M3 157,653.93 157,653.93 157,494.59 157,494.59 157,265.49 157,265.49 157,179.05 157,179.05 157,312.18 157,312.18 157,538.01 157,538.01 157,646.67 157,646.67 157,406.34 301,692.85
23 Pasir Urug (ada unsur lempung) M3 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 236,358.10
24 Sirtu M3 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 228,671.65
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 54,224.92 54,224.92 54,170.12 54,170.12 54,091.32 54,091.32 54,061.58 54,061.58 54,107.38 54,107.38 54,185.05 54,185.05 54,222.42 54,222.42 54,139.76 103,766.97
26 Anti Pengelupas Liter 77,320.72 77,320.72 77,242.57 77,242.57 77,130.21 77,130.21 77,087.82 77,087.82 77,153.11 77,153.11 77,263.86 77,263.86 77,317.16 77,317.16 77,199.29 147,964.01
27 Arbocell Kg 109,454.00 109,454.00 109,343.38 109,343.38 109,184.32 109,184.32 109,124.31 109,124.31 109,216.74 109,216.74 109,373.52 109,373.52 109,448.96 109,448.96 109,282.11 209,455.55
28 Asbuton Curah Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,535.40 8,535.40 8,526.78 8,526.78 8,514.37 8,514.37 8,509.69 8,509.69 8,516.90 8,516.90 8,529.13 8,529.13 8,535.01 8,535.01 8,522.00 16,333.69
30 Aspal Emulsi (CSS-1) Kg 9,464.26 9,464.26 9,454.69 9,454.69 9,440.94 9,440.94 9,435.75 9,435.75 9,443.74 9,443.74 9,457.30 9,457.30 9,463.82 9,463.82 9,449.39 18,111.18
31 Aspal Minyak (Drum) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
32 Aspal Modifikasi (BNA) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
33 Aspal Modifikasi (JAP-57) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
34 Aspal Modifikasi (Retona) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
35 Aspal Modifikasi (Starbit) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
36 Aspal Minyak (Curah) Kg 7,049.24 7,049.24 7,042.11 7,042.11 7,031.87 7,031.87 7,028.01 7,028.01 7,033.96 7,033.96 7,044.06 7,044.06 7,048.91 7,048.91 7,038.17 13,489.71
37 Assetilline Botol 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 230,593.26
38 Bahan Pengawet: Kreosot Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
39 Bensin Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
40 Beton B-0 M3 455,881.11 455,881.11 455,420.37 455,420.37 454,757.88 454,757.88 454,507.93 454,507.93 454,892.90 454,892.90 455,545.91 455,545.91 455,860.13 455,860.13 455,165.18 872,392.30
41 Beton K-125 (fc' 10 MPa) M3 471,334.71 471,334.71 470,858.35 470,858.35 470,173.40 470,173.40 469,914.98 469,914.98 470,313.00 470,313.00 470,988.14 470,988.14 471,313.01 471,313.01 470,594.51 901,964.92
42 Beton K-175 (fc' 15 MPa) M3 509,968.70 509,968.70 509,453.30 509,453.30 508,712.21 508,712.21 508,432.60 508,432.60 508,863.25 508,863.25 509,593.73 509,593.73 509,945.22 509,945.22 509,167.83 975,896.47
43 Beton K-250 (fc' 20 MPa) M3 567,919.69 567,919.69 567,345.72 567,345.72 566,520.41 566,520.41 566,209.03 566,209.03 566,688.62 566,688.62 567,502.11 567,502.11 567,893.55 567,893.55 567,027.81 1,086,793.80
44 Beton K-300 (fc' 25 MPa) M3 591,100.08 591,100.08 590,502.68 590,502.68 589,643.69 589,643.69 589,319.60 589,319.60 589,818.76 589,818.76 590,665.46 590,665.46 591,072.87 591,072.87 590,171.80 1,131,152.73
45 Beton K-350 (fc' 30 MPa) M3 614,280.48 614,280.48 613,659.65 613,659.65 612,766.98 612,766.98 612,430.18 612,430.18 612,948.91 612,948.91 613,828.81 613,828.81 614,252.20 614,252.20 613,315.79 1,175,511.66
46 Beton K-400 (fc' 35 MPa) M3 637,460.87 637,460.87 636,816.62 636,816.62 635,890.26 635,890.26 635,540.75 635,540.75 636,079.06 636,079.06 636,992.16 636,992.16 637,431.53 637,431.53 636,459.79 1,219,870.59
47 Beton K-450 (fc' 40 MPa) M3 668,368.07 668,368.07 667,692.58 667,692.58 666,721.30 666,721.30 666,354.84 666,354.84 666,919.26 666,919.26 667,876.63 667,876.63 668,337.30 668,337.30 667,318.44 1,279,015.83
48 Beton K-500 (fc' 45 MPa) M3 695,411.86 695,411.86 694,709.04 694,709.04 693,698.46 693,698.46 693,317.18 693,317.18 693,904.43 693,904.43 694,900.54 694,900.54 695,379.85 695,379.85 694,319.77 1,330,767.92
49 Bunker Oil Liter 3,012.50 3,012.50 3,009.45 3,009.45 3,005.07 3,005.07 3,003.42 3,003.42 3,005.97 3,005.97 3,010.28 3,010.28 3,012.36 3,012.36 3,007.76 5,764.83
50 Cat Kg 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
51 Cat Anti Karat Kg 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
52 Cat Marka (Non Thermoplas) Kg 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
53 Cat Marka (Thermoplastic) Kg 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
54 Cerucuk Diameter 10-15 cm M' 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
55 Cold Mix (Aspal Dingin) Kg 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,008,181.81 1,008,181.81 1,007,162.88 1,007,162.88 1,005,697.79 1,005,697.79 1,005,145.02 1,005,145.02 1,005,996.39 1,005,996.39 1,007,440.51 1,007,440.51 1,008,135.40 1,008,135.40 1,006,598.53 1,929,296.98
57 Curing Compound Liter 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 470,953.46 470,953.46 470,477.48 470,477.48 469,793.09 469,793.09 469,534.87 469,534.87 469,932.58 469,932.58 470,607.17 470,607.17 470,931.78 470,931.78 470,213.85 901,235.34
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 548,274.17 548,274.17 547,720.05 547,720.05 546,923.30 546,923.30 546,622.69 546,622.69 547,085.69 547,085.69 547,871.03 547,871.03 548,248.93 548,248.93 547,413.14 1,049,199.36
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 695,886.45 695,886.45 695,183.15 695,183.15 694,171.88 694,171.88 693,790.34 693,790.34 694,377.99 694,377.99 695,374.77 695,374.77 695,854.42 695,854.42 694,793.61 1,331,676.11
61 Kerosen/Minyak Tanah Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
62 Minyak Fluks Liter 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
63 Minyak Pelumas/Olie Liter 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
64 Oxygen (Isi 6 M3) Botol 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
65 Polytene 125 Mikron Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
66 Sand Sheet Ton 1,066,423.39 1,066,423.39 1,065,345.60 1,065,345.60 1,063,795.87 1,063,795.87 1,063,211.16 1,063,211.16 1,064,111.72 1,064,111.72 1,065,639.26 1,065,639.26 1,066,374.30 1,066,374.30 1,064,748.64 2,040,750.39
67 Seal Coat M2 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
68 Seal Guard Kg 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
69 Semen/PC (50 kg) Zak 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
70 Semen/PC (kg) Kg 1,556.46 1,556.46 1,554.88 1,554.88 1,552.62 1,552.62 1,551.77 1,551.77 1,553.08 1,553.08 1,555.31 1,555.31 1,556.38 1,556.38 1,554.01 2,978.50
71 Slurry Seal Ton 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
72 Solar Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
73 Thinner Liter 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
75 Baja Prategang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
77 Baja Tulangan (Polos) U25 Kg 15,664.98 15,664.98 15,649.14 15,649.14 15,626.38 15,626.38 15,617.79 15,617.79 15,631.02 15,631.02 15,653.46 15,653.46 15,664.26 15,664.26 15,640.38 29,977.12
78 Baja Tulangan (Polos) U32 Kg 15,664.98 15,664.98 15,649.14 15,649.14 15,626.38 15,626.38 15,617.79 15,617.79 15,631.02 15,631.02 15,653.46 15,653.46 15,664.26 15,664.26 15,640.38 29,977.12
79 Baja Tulangan (Polos) U36 Kg 15,664.98 15,664.98 15,649.14 15,649.14 15,626.38 15,626.38 15,617.79 15,617.79 15,631.02 15,631.02 15,653.46 15,653.46 15,664.26 15,664.26 15,640.38 29,977.12
80 Baja Tulangan (Ulir) D16 Kg 12,726.79 12,726.79 12,713.93 12,713.93 12,695.43 12,695.43 12,688.45 12,688.45 12,699.20 12,699.20 12,717.43 12,717.43 12,726.20 12,726.20 12,706.80 24,354.49
81 Baja Tulangan (Ulir) D19 Kg 12,726.79 12,726.79 12,713.93 12,713.93 12,695.43 12,695.43 12,688.45 12,688.45 12,699.20 12,699.20 12,717.43 12,717.43 12,726.20 12,726.20 12,706.80 24,354.49
82 Baja Tulangan (Ulir) D24 Kg 12,726.79 12,726.79 12,713.93 12,713.93 12,695.43 12,695.43 12,688.45 12,688.45 12,699.20 12,699.20 12,717.43 12,717.43 12,726.20 12,726.20 12,706.80 24,354.49
83 Baja Tulangan (Ulir) D32 Kg 12,726.79 12,726.79 12,713.93 12,713.93 12,695.43 12,695.43 12,688.45 12,688.45 12,699.20 12,699.20 12,717.43 12,717.43 12,726.20 12,726.20 12,706.80 24,354.49
84 Baja Tulangan (Ulir) D36 Kg 12,726.79 12,726.79 12,713.93 12,713.93 12,695.43 12,695.43 12,688.45 12,688.45 12,699.20 12,699.20 12,717.43 12,717.43 12,726.20 12,726.20 12,706.80 24,354.49
85 Besi Beton Kg 12,726.79 12,726.79 12,713.93 12,713.93 12,695.43 12,695.43 12,688.45 12,688.45 12,699.20 12,699.20 12,717.43 12,717.43 12,726.20 12,726.20 12,706.80 24,354.49
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,044,664.00 10,044,664.00 10,034,512.28 10,034,512.28 10,019,915.32 10,019,915.32 10,014,407.98 10,014,407.98 10,022,890.31 10,022,890.31 10,037,278.31 10,037,278.31 10,044,201.62 10,044,201.62 10,028,889.53 19,221,870.25
87 Box Culvert Type DUB 200×200 M' 10,663,229.74 10,663,229.74 10,652,452.86 10,652,452.86 10,636,956.99 10,636,956.99 10,631,110.50 10,631,110.50 10,640,115.19 10,640,115.19 10,655,389.22 10,655,389.22 10,662,738.88 10,662,738.88 10,646,483.85 20,405,582.34
88 Box Culvert Type uk 300×200 M' 11,512,753.45 11,512,753.45 11,501,118.00 11,501,118.00 11,484,387.60 11,484,387.60 11,478,075.33 11,478,075.33 11,487,797.40 11,487,797.40 11,504,288.29 11,504,288.29 11,512,223.49 11,512,223.49 11,494,673.44 22,031,264.86
89 Casing M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
90 Ducting (Kabel Prestress) M' 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
91 Ducting (Strand Prestress) M' 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
92 Expansion Cap M2 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
93 Expansion Join Baja Siku M' 1,680,972.46 1,680,972.46 1,679,273.57 1,679,273.57 1,676,830.78 1,676,830.78 1,675,909.12 1,675,909.12 1,677,328.64 1,677,328.64 1,679,736.47 1,679,736.47 1,680,895.08 1,680,895.08 1,678,332.61 3,216,776.05
94 Expansion Join Tipe Rubber M' 1,217,048.16 1,217,048.16 1,215,818.14 1,215,818.14 1,214,049.52 1,214,049.52 1,213,382.23 1,213,382.23 1,214,409.98 1,214,409.98 1,216,153.28 1,216,153.28 1,216,992.14 1,216,992.14 1,215,136.87 2,328,991.98
95 Expansion Join Tipe Torma M' 1,395,789.56 1,395,789.56 1,394,378.89 1,394,378.89 1,392,350.52 1,392,350.52 1,391,585.23 1,391,585.23 1,392,763.92 1,392,763.92 1,394,763.26 1,394,763.26 1,395,725.31 1,395,725.31 1,393,597.57 2,671,038.65
96 Expansion Tipe Joint Asphaltic Plug M' 1,655,868.33 1,655,868.33 1,654,194.82 1,654,194.82 1,651,788.50 1,651,788.50 1,650,880.61 1,650,880.61 1,652,278.93 1,652,278.93 1,654,650.80 1,654,650.80 1,655,792.11 1,655,792.11 1,653,267.90 3,168,735.78
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
99 Glass Bead Kg 54,224.92 54,224.92 54,170.12 54,170.12 54,091.32 54,091.32 54,061.58 54,061.58 54,107.38 54,107.38 54,185.05 54,185.05 54,222.42 54,222.42 54,139.76 103,766.97
100 Joint Sealent Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
101 Joint Socket Pile 16×16×16 Set 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
102 Joint Socket Pile 35×35 Set 604,507.42 604,507.42 603,896.47 603,896.47 603,018.00 603,018.00 602,686.55 602,686.55 603,197.04 603,197.04 604,062.94 604,062.94 604,479.59 604,479.59 603,558.08 1,156,809.55
103 Kawat Beton Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
104 Kawat Bronjong Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
105 Kawat Las Dos 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
106 Kayu Acuan (Kelas III/Meranti) M3 3,322,782.48 3,322,782.48 3,319,424.29 3,319,424.29 3,314,595.60 3,314,595.60 3,312,773.77 3,312,773.77 3,315,579.73 3,315,579.73 3,320,339.29 3,320,339.29 3,322,629.53 3,322,629.53 3,317,564.28 6,358,609.28
107 Kayu Perancah (Gelam) M3 2,140,322.79 2,140,322.79 2,138,159.66 2,138,159.66 2,135,049.33 2,135,049.33 2,133,875.82 2,133,875.82 2,135,683.24 2,135,683.24 2,138,749.04 2,138,749.04 2,140,224.27 2,140,224.27 2,136,961.56 4,095,807.18
108 Kerb Pracetak Type 1 (Peninggi) Buah 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
110 Marmer Nama Jembatan Buah 463,924.30 463,924.30 463,455.43 463,455.43 462,781.25 462,781.25 462,526.89 462,526.89 462,918.66 462,918.66 463,583.18 463,583.18 463,902.94 463,902.94 463,195.74 887,784.07
111 Mata Kucing Buah 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 232,514.88
112 Matras Concrete (Tebal=10 cm) M2 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 217,141.99
113 Mini Pile 16×16×16 M' 104,433.18 104,433.18 104,327.63 104,327.63 104,175.87 104,175.87 104,118.61 104,118.61 104,206.80 104,206.80 104,356.39 104,356.39 104,428.37 104,428.37 104,269.17 199,847.50
114 Mini Timber Pile Buah 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
115 Multipleks 12 mm Lbr 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 236,358.10
116 Paku Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
117 Paving Block (Model Bata 8 cm) M2 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 51,366,059.96 51,366,059.96 51,314,146.44 51,314,146.44 51,239,500.99 51,239,500.99 51,211,337.76 51,211,337.76 51,254,714.39 51,254,714.39 51,328,291.24 51,328,291.24 51,363,695.46 51,363,695.46 51,285,392.99 98,296,144.02
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 72,768,835.98 72,768,835.98 72,695,291.58 72,695,291.58 72,589,543.49 72,589,543.49 72,549,645.44 72,549,645.44 72,611,095.89 72,611,095.89 72,715,330.11 72,715,330.11 72,765,486.26 72,765,486.26 72,654,557.38 139,253,351.10
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 139,081,894.21 139,081,894.21 138,941,329.99 138,941,329.99 138,739,215.38 138,739,215.38 138,662,958.89 138,662,958.89 138,780,408.13 138,780,408.13 138,979,629.31 138,979,629.31 139,075,491.94 139,075,491.94 138,863,475.38 266,152,668.03
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 182,384,508.01 182,384,508.01 182,200,179.65 182,200,179.65 181,935,137.44 181,935,137.44 181,835,138.78 181,835,138.78 181,989,155.39 181,989,155.39 182,250,403.32 182,250,403.32 182,376,112.41 182,376,112.41 182,098,085.31 349,018,279.40
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 232,492,349.04 232,492,349.04 232,257,378.79 232,257,378.79 231,919,519.57 231,919,519.57 231,792,047.55 231,792,047.55 231,988,378.28 231,988,378.28 232,321,400.78 232,321,400.78 232,481,646.86 232,481,646.86 232,127,235.32 444,906,645.42
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 280,501,484.89 280,501,484.89 280,217,993.83 280,217,993.83 279,810,367.47 279,810,367.47 279,656,572.76 279,656,572.76 279,893,445.34 279,893,445.34 280,295,236.22 280,295,236.22 280,488,572.74 280,488,572.74 280,060,976.04 536,778,845.40
124 Pelat Rambu (Eng. Grade) Buah 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
125 Pelat Rambu (High L Grade) Buah 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 363,184.39
126 Pemantul Cahaya (Reflector) Buah 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
127 Pipa Baja D10" Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
128 Pipa Drainase Baja Dia 3" M' 212,883.01 212,883.01 212,667.86 212,667.86 212,358.50 212,358.50 212,241.78 212,241.78 212,421.55 212,421.55 212,726.48 212,726.48 212,873.21 212,873.21 212,548.69 407,381.43
129 Pipa Galvanis Dia 1,5" M' 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
130 Pipa Galvanis Dia 2" M' 243,007.97 243,007.97 242,762.37 242,762.37 242,409.23 242,409.23 242,275.99 242,275.99 242,481.20 242,481.20 242,829.29 242,829.29 242,996.78 242,996.78 242,626.34 465,029.75
131 Pipa Galvanis Dia 3" M' 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
132 Pipa Porus M' 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
133 Pipa PVC Dia 4" M' 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
134 Plastik Filter M2 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
135 Rel Pengaman M' 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 251,730.98
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,587,585.10 1,587,585.10 1,585,980.60 1,585,980.60 1,583,673.51 1,583,673.51 1,582,803.06 1,582,803.06 1,584,143.72 1,584,143.72 1,586,417.78 1,586,417.78 1,587,512.02 1,587,512.02 1,585,091.91 3,038,066.27
137 Strip Bearing Buah 243,007.97 243,007.97 242,762.37 242,762.37 242,409.23 242,409.23 242,275.99 242,275.99 242,481.20 242,481.20 242,829.29 242,829.29 242,996.78 242,996.78 242,626.34 465,029.75
138 Tiang Pancang Baja Diameter 400 M' 562,332.48 562,332.48 561,764.16 561,764.16 560,946.97 560,946.97 560,638.66 560,638.66 561,113.52 561,113.52 561,919.01 561,919.01 562,306.60 562,306.60 561,449.38 1,076,101.90
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 686,848.96 686,848.96 686,154.79 686,154.79 685,156.66 685,156.66 684,780.07 684,780.07 685,360.09 685,360.09 686,343.93 686,343.93 686,817.35 686,817.35 685,770.31 1,314,381.61
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,436,960.33 1,436,960.33 1,435,508.06 1,435,508.06 1,433,419.86 1,433,419.86 1,432,631.99 1,432,631.99 1,433,845.45 1,433,845.45 1,435,903.75 1,435,903.75 1,436,894.18 1,436,894.18 1,434,703.68 2,749,824.68
HARGA SATUAN DASAR UPAH KABUPATEN PROBOLINGGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 99,100 99,100 99,368.13 99,368.13 99,505.12 99,505.12 99,507.89 99,507.89 99,376.46 99,376.46 99,234.51 99,234.51 99,213.03 99,213.03 99,329.50 99,329.50 99,473.96 99,473.96
2 Tukang OH 111,500 111,500 111,801.68 111,801.68 111,955.81 111,955.81 111,958.93 111,958.93 111,811.06 111,811.06 111,651.34 111,651.34 111,627.17 111,627.17 111,758.22 111,758.22 111,920.75 111,920.75
3 Mandor OH 128,100 128,100 128,446.59 128,446.59 128,623.67 128,623.67 128,627.25 128,627.25 128,457.37 128,457.37 128,273.88 128,273.88 128,246.11 128,246.11 128,396.66 128,396.66 128,583.39 128,583.39
4 Operator OH 264,400 264,400 265,115.37 265,115.37 265,480.86 265,480.86 265,488.25 265,488.25 265,137.61 265,137.61 264,758.88 264,758.88 264,701.57 264,701.57 265,012.31 265,012.31 265,397.73 265,397.73
5 Pembantu Operator OH 165,200 165,200 165,646.97 165,646.97 165,875.33 165,875.33 165,879.95 165,879.95 165,660.86 165,660.86 165,424.23 165,424.23 165,388.42 165,388.42 165,582.58 165,582.58 165,823.39 165,823.39
6 Sopir OH 123,900 123,900 124,235.23 124,235.23 124,406.50 124,406.50 124,409.96 124,409.96 124,245.65 124,245.65 124,068.17 124,068.17 124,041.32 124,041.32 124,186.93 124,186.93 124,367.54 124,367.54
7 Pembantu Sopir OH 107,400 107,400 107,690.59 107,690.59 107,839.05 107,839.05 107,842.05 107,842.05 107,699.62 107,699.62 107,545.78 107,545.78 107,522.50 107,522.50 107,648.72 107,648.72 107,805.28 107,805.28
8 Mekanik OH 148,700 148,700 149,102.33 149,102.33 149,307.88 149,307.88 149,312.04 149,312.04 149,114.83 149,114.83 148,901.84 148,901.84 148,869.60 148,869.60 149,044.37 149,044.37 149,261.13 149,261.13
9 Pembantu Mekanik OH 107,400 107,400 107,690.59 107,690.59 107,839.05 107,839.05 107,842.05 107,842.05 107,699.62 107,699.62 107,545.78 107,545.78 107,522.50 107,522.50 107,648.72 107,648.72 107,805.28 107,805.28
10 Kepala Tukang OH 123,900 123,900 124,235.23 124,235.23 124,406.50 124,406.50 124,409.96 124,409.96 124,245.65 124,245.65 124,068.17 124,068.17 124,041.32 124,041.32 124,186.93 124,186.93 124,367.54 124,367.54
11 Pemasak Aspal OH 123,900 123,900 124,235.23 124,235.23 124,406.50 124,406.50 124,409.96 124,409.96 124,245.65 124,245.65 124,068.17 124,068.17 124,041.32 124,041.32 124,186.93 124,186.93 124,367.54 124,367.54

HARGA SATUAN DASAR ALAT KABUPATEN PROBOLINGGO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 389,133 434,600 390,185.93 435,775.88 390,723.84 436,376.63 390,734.72 436,388.78 390,218.65 435,812.42 389,661.26 435,189.90 389,576.91 435,095.69 390,034.24 435,606.46 390,601.49 436,239.98
2 Asphalt Distribution Unit/Jam 239,594 308,200 240,241.87 309,033.88 240,573.06 309,459.91 240,579.76 309,468.53 240,262.02 309,059.80 239,918.82 308,618.33 239,866.89 308,551.52 240,148.47 308,913.74 240,497.73 309,363.01
3 Asphalt Finisher Unit/Jam 175,977 834,400 176,453.51 836,657.60 176,696.77 837,811.00 176,701.69 837,834.33 176,468.31 836,727.76 176,216.24 835,532.57 176,178.09 835,351.69 176,384.91 836,332.34 176,641.44 837,548.65
4 Asphalt Liquid Mixer Unit/Jam 62,790 114,800 62,959.94 115,110.61 63,046.73 115,269.30 63,048.49 115,272.51 62,965.22 115,120.26 62,875.28 114,955.82 62,861.67 114,930.94 62,935.46 115,065.86 63,026.99 115,233.20
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 84,271 84,271 84,498.86 84,498.86 84,615.35 84,615.35 84,617.71 84,617.71 84,505.95 84,505.95 84,385.24 84,385.24 84,366.97 84,366.97 84,466.01 84,466.01 84,588.86 84,588.86
6 Asphalt Mixing Plant Unit/Jam 941,851 5,845,076 944,399.07 5,860,890.75 945,701.01 5,868,970.51 945,727.34 5,869,133.88 944,478.27 5,861,382.23 943,129.16 5,853,009.76 942,925.00 5,851,742.73 944,031.93 5,858,612.26 945,404.87 5,867,132.67
7 Asphalt Sprayer Unit/Jam 77,661 78,584 77,871.50 78,796.62 77,978.86 78,905.25 77,981.03 78,907.45 77,878.03 78,803.23 77,766.79 78,690.67 77,749.96 78,673.63 77,841.23 78,765.99 77,954.44 78,880.54
8 Asphalt Tanker Unit/Jam 363,521 421,400 364,504.91 422,540.16 365,007.41 423,122.67 365,017.57 423,134.45 364,535.47 422,575.60 364,014.77 421,971.98 363,935.97 421,880.64 364,363.20 422,375.89 364,893.11 422,990.17
9 Blending Equipment Unit/Jam 118,144 186,700 118,464.09 187,205.15 118,627.41 187,463.22 118,630.71 187,468.44 118,474.03 187,220.84 118,304.80 186,953.42 118,279.19 186,912.94 118,418.04 187,132.37 118,590.26 187,404.52
10 Bore Pile Machine Unit/Jam 325,517 565,900 326,397.57 567,431.13 326,847.54 568,213.38 326,856.64 568,229.20 326,424.95 567,478.71 325,958.68 566,668.12 325,888.11 566,545.45 326,270.68 567,210.53 326,745.19 568,035.45
11 Bore Pile Machine Dia 60 Unit/Jam 213,156 644,400 213,732.42 646,143.52 214,027.07 647,034.29 214,033.03 647,052.30 213,750.35 646,197.71 213,445.02 645,274.67 213,398.82 645,134.98 213,649.33 645,892.33 213,960.05 646,831.67
12 Bore Pile Machine Dia 80 Unit/Jam 842,709 842,709 844,988.65 844,988.65 846,153.54 846,153.54 846,177.09 846,177.09 845,059.50 845,059.50 843,852.41 843,852.41 843,669.74 843,669.74 844,660.15 844,660.15 845,888.57 845,888.57
13 Bulldozer 100-150 HP Unit/Jam 330,474 486,036 331,368.10 487,351.04 331,824.92 488,022.90 331,834.15 488,036.49 331,395.88 487,391.91 330,922.51 486,695.72 330,850.88 486,590.36 331,239.27 487,161.58 331,721.01 487,870.08
14 Cement Tanker Unit/Jam 307,341 396,600 308,172.33 397,673.06 308,597.17 398,221.29 308,605.76 398,232.38 308,198.17 397,706.41 307,757.94 397,138.32 307,691.32 397,052.35 308,052.52 397,518.46 308,500.54 398,096.59
15 Cold Milling Unit/Jam 480,013 1,390,400 481,312.16 1,394,161.94 481,975.69 1,396,083.92 481,989.11 1,396,122.78 481,352.52 1,394,278.85 480,664.95 1,392,287.25 480,560.90 1,391,985.85 481,125.04 1,393,619.94 481,824.76 1,395,646.74
16 Cold Recycler Unit/Jam 4,042,523 4,042,523 4,053,460.24 4,053,460.24 4,059,048.29 4,059,048.29 4,059,161.28 4,059,161.28 4,053,800.15 4,053,800.15 4,048,009.65 4,048,009.65 4,047,133.36 4,047,133.36 4,051,884.40 4,051,884.40 4,057,777.22 4,057,777.22
17 Compressor 4000-6500 L\M Unit/Jam 123,102 151,873 123,434.62 152,283.92 123,604.78 152,493.85 123,608.22 152,498.10 123,444.97 152,296.69 123,268.64 152,079.14 123,241.95 152,046.22 123,386.63 152,224.71 123,566.08 152,446.10
18 Concrete Breaker Unit/Jam 448,618 855,100 449,832.19 857,413.60 450,452.32 858,595.62 450,464.86 858,619.53 449,869.91 857,485.51 449,227.31 856,260.66 449,130.07 856,075.30 449,657.31 857,080.27 450,311.27 858,326.76
19 Concrete Mixer (350) Unit/Jam 83,445 83,445 83,670.44 83,670.44 83,785.79 83,785.79 83,788.12 83,788.12 83,677.46 83,677.46 83,557.93 83,557.93 83,539.85 83,539.85 83,637.92 83,637.92 83,759.55 83,759.55
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 95,011 95,011 95,268.33 95,268.33 95,399.66 95,399.66 95,402.32 95,402.32 95,276.32 95,276.32 95,140.22 95,140.22 95,119.63 95,119.63 95,231.29 95,231.29 95,369.79 95,369.79
21 Concrete Pan Mixer Unit/Jam 252,813 541,200 253,496.59 542,664.30 253,846.06 543,412.41 253,853.13 543,427.54 253,517.85 542,709.81 253,155.72 541,934.59 253,100.92 541,817.28 253,398.04 542,453.33 253,766.57 543,242.24
22 Concrete Pump Unit/Jam 192,501 244,020 193,021.92 244,680.23 193,288.01 245,017.55 193,293.39 245,024.37 193,038.10 244,700.75 192,762.36 244,351.22 192,720.64 244,298.32 192,946.88 244,585.11 193,227.49 244,940.82
23 Concrete Vibrator Unit/Jam 71,878 71,878 72,072.56 72,072.56 72,171.92 72,171.92 72,173.93 72,173.93 72,078.60 72,078.60 71,975.65 71,975.65 71,960.07 71,960.07 72,044.54 72,044.54 72,149.32 72,149.32
24 Crane 10-15 Ton Unit/Jam 257,770 379,085 258,467.11 380,110.67 258,823.43 380,634.69 258,830.64 380,645.28 258,488.79 380,142.55 258,119.56 379,599.55 258,063.68 379,517.37 258,366.63 379,962.90 258,742.39 380,515.50
25 Crane On Track 35 Ton Unit/Jam 213,982 441,318 214,560.84 442,512.05 214,856.63 443,122.10 214,862.61 443,134.43 214,578.84 442,549.16 214,272.33 441,917.02 214,225.94 441,821.36 214,477.43 442,340.02 214,789.35 442,983.33
26 Crane On Track 75-100 Ton Unit/Jam 336,257 509,800 337,167.04 511,179.34 337,631.85 511,884.05 337,641.25 511,898.30 337,195.31 511,222.21 336,713.66 510,491.97 336,640.77 510,381.46 337,035.96 510,980.61 337,526.12 511,723.75
27 Dump Truck 10 Ton Unit/Jam 318,081 348,157 318,941.79 349,098.99 319,381.48 349,580.26 319,390.37 349,589.99 318,968.54 349,128.27 318,512.92 348,629.57 318,443.97 348,554.10 318,817.80 348,963.28 319,281.47 349,470.79
28 Dump Truck 3-4 M3 Unit/Jam 173,499 255,275 173,968.25 255,965.69 174,208.08 256,318.56 174,212.93 256,325.69 173,982.84 255,987.15 173,734.32 255,621.50 173,696.71 255,566.16 173,900.62 255,866.18 174,153.53 256,238.29
29 Excavator 80-140 HP Unit/Jam 251,160 448,791 251,839.75 450,005.27 252,186.94 450,625.64 252,193.96 450,638.19 251,860.87 450,043.01 251,501.11 449,400.16 251,446.67 449,302.88 251,741.85 449,830.33 252,107.97 450,484.53
30 Flat Bed Truck 3-4 M3 Unit/Jam 304,862 407,300 305,687.07 408,402.01 306,108.49 408,965.03 306,117.01 408,976.42 305,712.70 408,436.26 305,276.02 407,852.84 305,209.93 407,764.56 305,568.23 408,243.24 306,012.63 408,836.97
31 Fulvi Mixer Unit/Jam 763,395 1,192,200 765,460.30 1,195,425.68 766,515.56 1,197,073.68 766,536.89 1,197,107.00 765,524.49 1,195,525.93 764,431.01 1,193,818.22 764,265.53 1,193,559.79 765,162.72 1,194,960.94 766,275.53 1,196,698.82
32 Generator Set Unit/Jam 339,562 545,487 340,480.72 546,962.90 340,950.10 547,716.94 340,959.59 547,732.18 340,509.27 547,008.77 340,022.88 546,227.41 339,949.28 546,109.17 340,348.35 546,750.26 340,843.33 547,545.42
33 Hot Recycler Unit/Jam 2,494,252 7,314,200 2,501,000.71 7,333,989.69 2,504,448.56 7,344,100.24 2,504,518.27 7,344,304.68 2,501,210.44 7,334,604.71 2,497,637.67 7,324,127.86 2,497,097.00 7,322,542.37 2,500,028.41 7,331,138.51 2,503,664.30 7,341,800.48
34 Jack Hammer Unit/Jam 47,093 47,093 47,219.95 47,219.95 47,285.05 47,285.05 47,286.37 47,286.37 47,223.91 47,223.91 47,156.46 47,156.46 47,146.25 47,146.25 47,201.60 47,201.60 47,270.24 47,270.24
35 Launching Gantry Unit/Jam 59,930,624 59,930,624 60,092,775.81 60,092,775.81 60,175,619.02 60,175,619.02 60,177,294.16 60,177,294.16 60,097,815.11 60,097,815.11 60,011,970.60 60,011,970.60 59,998,979.54 59,998,979.54 60,069,414.02 60,069,414.02 60,156,775.36 60,156,775.36
36 Motor Grader > 100 HP Unit/Jam 235,463 521,851 236,099.77 523,262.95 236,425.25 523,984.31 236,431.83 523,998.90 236,119.57 523,306.83 235,782.29 522,559.33 235,731.25 522,446.21 236,007.98 523,059.52 236,351.22 523,820.23
37 Pedestrian Roller Unit/Jam 77,661 77,661 77,871.50 77,871.50 77,978.86 77,978.86 77,981.03 77,981.03 77,878.03 77,878.03 77,766.79 77,766.79 77,749.96 77,749.96 77,841.23 77,841.23 77,954.44 77,954.44
38 Pile Driver + Hammer Unit/Jam 88,402 258,600 88,640.97 259,299.68 88,763.17 259,657.15 88,765.64 259,664.38 88,648.40 259,321.43 88,521.77 258,951.01 88,502.61 258,894.95 88,606.51 259,198.88 88,735.37 259,575.84
39 Rock Drill Breaker Unit/Jam 85,923 279,300 86,155.70 280,055.69 86,274.48 280,441.77 86,276.88 280,449.58 86,162.93 280,079.17 86,039.85 279,679.11 86,021.23 279,618.56 86,122.21 279,946.81 86,247.46 280,353.95
40 Split Form Paver Unit/Jam 181,761 181,761 182,252.45 182,252.45 182,503.70 182,503.70 182,508.78 182,508.78 182,267.74 182,267.74 182,007.38 182,007.38 181,967.98 181,967.98 182,181.60 182,181.60 182,446.55 182,446.55
41 Stone Crusher Unit/Jam 486,623 713,537 487,939.52 715,467.58 488,612.19 716,453.92 488,625.79 716,473.86 487,980.44 715,527.58 487,283.40 714,505.51 487,177.92 714,350.84 487,749.83 715,189.44 488,459.18 716,229.57
42 Tamper Unit/Jam 72,704 72,704 72,900.98 72,900.98 73,001.48 73,001.48 73,003.51 73,003.51 72,907.09 72,907.09 72,802.95 72,802.95 72,787.19 72,787.19 72,872.64 72,872.64 72,978.62 72,978.62
43 Tandem Roller 6-8 T Unit/Jam 351,129 409,800 352,078.60 410,908.78 352,563.97 411,475.25 352,573.79 411,486.71 352,108.13 410,943.23 351,605.17 410,356.24 351,529.06 410,267.41 351,941.73 410,749.03 352,453.57 411,346.40
44 Three Wheel Roller 6-8 T Unit/Jam 116,492 184,277 116,807.25 184,775.59 116,968.28 185,030.32 116,971.54 185,035.47 116,817.05 184,791.08 116,650.19 184,527.13 116,624.93 184,487.18 116,761.84 184,703.76 116,931.66 184,972.38
45 Tire Roller 8-10 T Unit/Jam 208,199 375,900 208,761.90 376,917.06 209,049.70 377,436.67 209,055.52 377,447.18 208,779.41 376,948.66 208,481.18 376,410.22 208,436.05 376,328.74 208,680.74 376,770.52 208,984.23 377,318.48
46 Track Loader 75-100 HP Unit/Jam 194,980 415,171 195,507.18 416,294.31 195,776.70 416,868.21 195,782.15 416,879.81 195,523.57 416,329.22 195,244.28 415,734.53 195,202.02 415,644.53 195,431.17 416,132.47 195,715.39 416,737.67
47 Trailer 20 Ton Unit/Jam 314,776 449,824 315,628.11 451,041.07 316,063.23 451,662.87 316,072.03 451,675.44 315,654.58 451,078.89 315,203.69 450,434.56 315,135.46 450,337.06 315,505.41 450,865.72 315,964.26 451,521.43
48 Trailler 15 Ton Unit/Jam 272,641 414,700 273,378.68 415,822.03 273,755.56 416,395.28 273,763.18 416,406.87 273,401.60 415,856.90 273,011.07 415,262.89 272,951.97 415,173.00 273,272.40 415,660.38 273,669.83 416,264.89
49 Truck Mixer (agitator) Unit/Jam 342,867 504,000 343,794.40 505,363.65 344,268.35 506,060.34 344,277.93 506,074.43 343,823.23 505,406.03 343,332.11 504,684.10 343,257.79 504,574.85 343,660.75 505,167.18 344,160.55 505,901.87
50 Vibrating Rammer Unit/Jam 70,226 70,226 70,415.72 70,415.72 70,512.79 70,512.79 70,514.76 70,514.76 70,421.63 70,421.63 70,321.03 70,321.03 70,305.81 70,305.81 70,388.35 70,388.35 70,490.71 70,490.71
51 Vibratory Roller 5-8 T Unit/Jam 169,368 363,500 169,826.15 364,483.50 170,060.27 364,985.98 170,065.00 364,996.14 169,840.39 364,514.07 169,597.79 363,993.39 169,561.07 363,914.60 169,760.13 364,341.81 170,007.02 364,871.68
52 Water Pump 70-100 MM Unit/Jam 52,876 52,876 53,018.90 53,018.90 53,091.99 53,091.99 53,093.46 53,093.46 53,023.34 53,023.34 52,947.60 52,947.60 52,936.14 52,936.14 52,998.28 52,998.28 53,075.36 53,075.36
53 Water Tanker 3000-4500 L Unit/Jam 191,675 221,873 192,193.50 222,473.31 192,458.45 222,780.01 192,463.81 222,786.21 192,209.61 222,491.97 191,935.06 222,174.16 191,893.51 222,126.06 192,118.78 222,386.82 192,398.18 222,710.25
54 Welding Set Unit/Jam 107,404 107,404 107,694.63 107,694.63 107,843.10 107,843.10 107,846.10 107,846.10 107,703.66 107,703.66 107,549.82 107,549.82 107,526.54 107,526.54 107,652.76 107,652.76 107,809.33 107,809.33
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 186,718 427,027 187,222.97 428,182.39 187,481.08 428,772.67 187,486.30 428,784.61 187,238.67 428,218.29 186,971.22 427,606.62 186,930.75 427,514.06 187,150.19 428,015.93 187,422.37 428,638.41
HARGA SATUAN DASAR BAHAN KABUPATEN PROBOLINGGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 260,200 260,200 260,904.01 260,904.01 261,263.69 261,263.69 261,270.96 261,270.96 260,925.89 260,925.89 260,553.18 260,553.18 260,496.78 260,496.78 260,802.58 260,802.58 261,181.88 261,181.88
2 Agregat Pecah Mesin 20-30 mm M3 285,272 285,272 286,043.85 286,043.85 286,438.18 286,438.18 286,446.16 286,446.16 286,067.83 286,067.83 285,659.21 285,659.21 285,597.37 285,597.37 285,932.64 285,932.64 286,348.49 286,348.49
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 312,969 312,969 313,815.79 313,815.79 314,248.41 314,248.41 314,257.16 314,257.16 313,842.10 313,842.10 313,393.81 313,393.81 313,325.96 313,325.96 313,693.79 313,693.79 314,150.00 314,150.00
4 Bahan Agr. Base Kelas A M3 272,600 272,600 273,337.56 273,337.56 273,714.38 273,714.38 273,722.00 273,722.00 273,360.48 273,360.48 272,970.01 272,970.01 272,910.92 272,910.92 273,231.30 273,231.30 273,628.67 273,628.67
5 Bahan Agr. Base Kelas B M3 256,100 256,100 256,792.92 256,792.92 257,146.93 257,146.93 257,154.09 257,154.09 256,814.45 256,814.45 256,447.61 256,447.61 256,392.10 256,392.10 256,693.09 256,693.09 257,066.41 257,066.41
6 Bahan Agr. Base Kelas C M3 235,500 235,500 236,137.18 236,137.18 236,462.72 236,462.72 236,469.30 236,469.30 236,156.98 236,156.98 235,819.65 235,819.65 235,768.60 235,768.60 236,045.38 236,045.38 236,388.67 236,388.67
7 Bahan Agr. Base Kelas C2 M3 214,800 214,800 215,381.17 215,381.17 215,678.10 215,678.10 215,684.10 215,684.10 215,399.24 215,399.24 215,091.56 215,091.56 215,044.99 215,044.99 215,297.44 215,297.44 215,610.56 215,610.56
8 Bahan Agr. Base Kelas S M3 173,900 173,900 174,370.51 174,370.51 174,610.90 174,610.90 174,615.76 174,615.76 174,385.14 174,385.14 174,136.04 174,136.04 174,098.35 174,098.35 174,302.72 174,302.72 174,556.22 174,556.22
9 Bahan Pilihan M3 173,500 173,500 173,969.43 173,969.43 174,209.26 174,209.26 174,214.11 174,214.11 173,984.02 173,984.02 173,735.50 173,735.50 173,697.89 173,697.89 173,901.80 173,901.80 174,154.71 174,154.71
10 Bahan Tanah Timbunan M3 99,100 99,100 99,368.13 99,368.13 99,505.12 99,505.12 99,507.89 99,507.89 99,376.46 99,376.46 99,234.51 99,234.51 99,213.03 99,213.03 99,329.50 99,329.50 99,473.96 99,473.96
11 Batu Belah/Kerakal M3 280,000 280,000 280,757.58 280,757.58 281,144.63 281,144.63 281,152.46 281,152.46 280,781.13 280,781.13 280,380.06 280,380.06 280,319.36 280,319.36 280,648.44 280,648.44 281,056.59 281,056.59
12 Batu Kali M3 308,600 308,600 309,434.96 309,434.96 309,861.55 309,861.55 309,870.17 309,870.17 309,460.91 309,460.91 309,018.88 309,018.88 308,951.98 308,951.98 309,314.67 309,314.67 309,764.52 309,764.52
13 Chipping M3 183,900 183,900 184,397.57 184,397.57 184,651.78 184,651.78 184,656.92 184,656.92 184,413.03 184,413.03 184,149.61 184,149.61 184,109.75 184,109.75 184,325.88 184,325.88 184,593.96 184,593.96
14 Chipping (kg) Kg 300 300 300.81 300.81 301.23 301.23 301.23 301.23 300.84 300.84 300.41 300.41 300.34 300.34 300.69 300.69 301.13 301.13
15 Filler Cement Kg 1,652 1,652 1,656.47 1,656.47 1,658.75 1,658.75 1,658.80 1,658.80 1,656.61 1,656.61 1,654.24 1,654.24 1,653.88 1,653.88 1,655.83 1,655.83 1,658.23 1,658.23
16 Gebalan Rumput M' 5,500 5,500 5,514.88 5,514.88 5,522.48 5,522.48 5,522.64 5,522.64 5,515.34 5,515.34 5,507.47 5,507.47 5,506.27 5,506.27 5,512.74 5,512.74 5,520.75 5,520.75
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 329,800 329,800 330,692.32 330,692.32 331,148.21 331,148.21 331,157.43 331,157.43 330,720.06 330,720.06 330,247.65 330,247.65 330,176.16 330,176.16 330,563.76 330,563.76 331,044.52 331,044.52
18 Kapur M3 82,600 82,600 82,823.49 82,823.49 82,937.67 82,937.67 82,939.98 82,939.98 82,830.43 82,830.43 82,712.12 82,712.12 82,694.21 82,694.21 82,791.29 82,791.29 82,911.69 82,911.69
19 Pasir Beton (Kasar) M3 392,400 392,400 393,461.70 393,461.70 394,004.12 394,004.12 394,015.09 394,015.09 393,494.69 393,494.69 392,932.62 392,932.62 392,847.56 392,847.56 393,308.74 393,308.74 393,880.74 393,880.74
20 Pasir Halus (untuk HRS) M3 247,900 247,900 248,570.73 248,570.73 248,913.41 248,913.41 248,920.34 248,920.34 248,591.58 248,591.58 248,236.48 248,236.48 248,182.75 248,182.75 248,474.10 248,474.10 248,835.46 248,835.46
21 Pasir Pasang (Sedang) M3 277,400 277,400 278,150.55 278,150.55 278,534.00 278,534.00 278,541.76 278,541.76 278,173.87 278,173.87 277,776.53 277,776.53 277,716.39 277,716.39 278,042.41 278,042.41 278,446.78 278,446.78
22 Pasir Urug M3 168,500 168,500 168,955.90 168,955.90 169,188.82 169,188.82 169,193.53 169,193.53 168,970.07 168,970.07 168,728.71 168,728.71 168,692.19 168,692.19 168,890.22 168,890.22 169,135.84 169,135.84
23 Pasir Urug (ada unsur lempung) M3 132,200 132,200 132,557.69 132,557.69 132,740.43 132,740.43 132,744.13 132,744.13 132,568.80 132,568.80 132,379.44 132,379.44 132,350.78 132,350.78 132,506.15 132,506.15 132,698.86 132,698.86
24 Sirtu M3 214,486 214,486 215,066.32 215,066.32 215,362.81 215,362.81 215,368.81 215,368.81 215,084.36 215,084.36 214,777.13 214,777.13 214,730.64 214,730.64 214,982.72 214,982.72 215,295.37 215,295.37
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
26 Anti Pengelupas Liter 83,200 83,200 83,425.11 83,425.11 83,540.12 83,540.12 83,542.44 83,542.44 83,432.11 83,432.11 83,312.93 83,312.93 83,294.90 83,294.90 83,392.68 83,392.68 83,513.96 83,513.96
27 Arbocell Kg 117,300 117,300 117,617.37 117,617.37 117,779.52 117,779.52 117,782.80 117,782.80 117,627.24 117,627.24 117,459.22 117,459.22 117,433.79 117,433.79 117,571.65 117,571.65 117,742.64 117,742.64
28 Asbuton Curah Kg 12,100 12,100 12,132.74 12,132.74 12,149.46 12,149.46 12,149.80 12,149.80 12,133.76 12,133.76 12,116.42 12,116.42 12,113.80 12,113.80 12,128.02 12,128.02 12,145.66 12,145.66
29 Aspal Emulsi (CRS-1/53 R-65) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
30 Aspal Emulsi (CSS-1) Kg 8,100 8,100 8,121.92 8,121.92 8,133.11 8,133.11 8,133.34 8,133.34 8,122.60 8,122.60 8,110.99 8,110.99 8,109.24 8,109.24 8,118.76 8,118.76 8,130.57 8,130.57
31 Aspal Minyak (Drum) Kg 8,300 8,300 8,322.46 8,322.46 8,333.93 8,333.93 8,334.16 8,334.16 8,323.15 8,323.15 8,311.27 8,311.27 8,309.47 8,309.47 8,319.22 8,319.22 8,331.32 8,331.32
32 Aspal Modifikasi (BNA) Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
33 Aspal Modifikasi (JAP-57) Kg 13,400 13,400 13,436.26 13,436.26 13,454.78 13,454.78 13,455.15 13,455.15 13,437.38 13,437.38 13,418.19 13,418.19 13,415.28 13,415.28 13,431.03 13,431.03 13,450.57 13,450.57
34 Aspal Modifikasi (Retona) Kg 9,900 9,900 9,926.79 9,926.79 9,940.47 9,940.47 9,940.75 9,940.75 9,927.62 9,927.62 9,913.44 9,913.44 9,911.29 9,911.29 9,922.93 9,922.93 9,937.36 9,937.36
35 Aspal Modifikasi (Starbit) Kg 13,200 13,200 13,235.71 13,235.71 13,253.96 13,253.96 13,254.33 13,254.33 13,236.82 13,236.82 13,217.92 13,217.92 13,215.06 13,215.06 13,230.57 13,230.57 13,249.81 13,249.81
36 Aspal Minyak (Curah) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
37 Assetilline Botol 128,700 128,700 129,048.22 129,048.22 129,226.12 129,226.12 129,229.72 129,229.72 129,059.04 129,059.04 128,874.69 128,874.69 128,846.79 128,846.79 128,998.05 128,998.05 129,185.66 129,185.66
38 Bahan Pengawet: Kreosot Liter 8,700 8,700 8,723.54 8,723.54 8,735.57 8,735.57 8,735.81 8,735.81 8,724.27 8,724.27 8,711.81 8,711.81 8,709.92 8,709.92 8,720.15 8,720.15 8,732.83 8,732.83
39 Bensin Liter 9,500 9,500 9,525.70 9,525.70 9,538.84 9,538.84 9,539.10 9,539.10 9,526.50 9,526.50 9,512.89 9,512.89 9,510.84 9,510.84 9,522.00 9,522.00 9,535.85 9,535.85
40 Beton B-0 M3 487,449 487,449 488,767.94 488,767.94 489,441.75 489,441.75 489,455.38 489,455.38 488,808.93 488,808.93 488,110.71 488,110.71 488,005.04 488,005.04 488,577.93 488,577.93 489,288.49 489,288.49
41 Beton K-125 (fc' 10 MPa) M3 503,973 503,973 505,336.35 505,336.35 506,033.00 506,033.00 506,047.08 506,047.08 505,378.72 505,378.72 504,656.83 504,656.83 504,547.59 504,547.59 505,139.89 505,139.89 505,874.54 505,874.54
42 Beton K-175 (fc' 15 MPa) M3 545,282 545,282 546,757.36 546,757.36 547,511.11 547,511.11 547,526.35 547,526.35 546,803.21 546,803.21 546,022.15 546,022.15 545,903.95 545,903.95 546,544.80 546,544.80 547,339.66 547,339.66
43 Beton K-250 (fc' 20 MPa) M3 607,246 607,246 608,888.88 608,888.88 609,728.28 609,728.28 609,745.26 609,745.26 608,939.94 608,939.94 608,070.12 608,070.12 607,938.49 607,938.49 608,652.16 608,652.16 609,537.35 609,537.35
44 Beton K-300 (fc' 25 MPa) M3 632,031 632,031 633,741.48 633,741.48 634,615.15 634,615.15 634,632.82 634,632.82 633,794.63 633,794.63 632,889.31 632,889.31 632,752.30 632,752.30 633,495.11 633,495.11 634,416.43 634,416.43
45 Beton K-350 (fc' 30 MPa) M3 656,817 656,817 658,594.09 658,594.09 659,502.02 659,502.02 659,520.38 659,520.38 658,649.32 658,649.32 657,708.50 657,708.50 657,566.12 657,566.12 658,338.05 658,338.05 659,295.50 659,295.50
46 Beton K-400 (fc' 35 MPa) M3 681,603 681,603 683,446.70 683,446.70 684,388.89 684,388.89 684,407.94 684,407.94 683,504.01 683,504.01 682,527.69 682,527.69 682,379.94 682,379.94 683,181.00 683,181.00 684,174.58 684,174.58
47 Beton K-450 (fc' 40 MPa) M3 714,650 714,650 716,583.51 716,583.51 717,571.38 717,571.38 717,591.36 717,591.36 716,643.60 716,643.60 715,619.94 715,619.94 715,465.02 715,465.02 716,304.93 716,304.93 717,346.68 717,346.68
48 Beton K-500 (fc' 45 MPa) M3 743,566 743,566 745,578.22 745,578.22 746,606.06 746,606.06 746,626.85 746,626.85 745,640.74 745,640.74 744,575.66 744,575.66 744,414.47 744,414.47 745,288.36 745,288.36 746,372.27 746,372.27
49 Bunker Oil Liter 3,500 3,500 3,509.47 3,509.47 3,514.31 3,514.31 3,514.41 3,514.41 3,509.76 3,509.76 3,504.75 3,504.75 3,503.99 3,503.99 3,508.11 3,508.11 3,513.21 3,513.21
50 Cat Kg 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35 95,220.00 95,220.00 95,358.49 95,358.49
51 Cat Anti Karat Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
52 Cat Marka (Non Thermoplas) Kg 58,000 58,000 58,156.93 58,156.93 58,237.10 58,237.10 58,238.72 58,238.72 58,161.80 58,161.80 58,078.73 58,078.73 58,066.15 58,066.15 58,134.32 58,134.32 58,218.87 58,218.87
53 Cat Marka (Thermoplastic) Kg 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
54 Cerucuk Diameter 10-15 cm M' 20,700 20,700 20,756.01 20,756.01 20,784.62 20,784.62 20,785.20 20,785.20 20,757.75 20,757.75 20,728.10 20,728.10 20,723.61 20,723.61 20,747.94 20,747.94 20,778.11 20,778.11
55 Cold Mix (Aspal Dingin) Kg 6,200 6,200 6,216.78 6,216.78 6,225.35 6,225.35 6,225.52 6,225.52 6,217.30 6,217.30 6,208.42 6,208.42 6,207.07 6,207.07 6,214.36 6,214.36 6,223.40 6,223.40
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,078,200 1,078,200 1,081,117.24 1,081,117.24 1,082,607.65 1,082,607.65 1,082,637.79 1,082,637.79 1,081,207.90 1,081,207.90 1,079,663.48 1,079,663.48 1,079,429.77 1,079,429.77 1,080,696.94 1,080,696.94 1,082,268.64 1,082,268.64
57 Curing Compound Liter 41,300 41,300 41,411.74 41,411.74 41,468.83 41,468.83 41,469.99 41,469.99 41,415.22 41,415.22 41,356.06 41,356.06 41,347.11 41,347.11 41,395.64 41,395.64 41,455.85 41,455.85
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 504,000 504,000 505,363.65 505,363.65 506,060.34 506,060.34 506,074.43 506,074.43 505,406.03 505,406.03 504,684.10 504,684.10 504,574.85 504,574.85 505,167.18 505,167.18 505,901.87 505,901.87
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 586,600 586,600 588,187.14 588,187.14 588,998.00 588,998.00 589,014.40 589,014.40 588,236.46 588,236.46 587,396.22 587,396.22 587,269.06 587,269.06 587,958.47 587,958.47 588,813.56 588,813.56
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 743,600 743,600 745,611.92 745,611.92 746,639.82 746,639.82 746,660.60 746,660.60 745,674.45 745,674.45 744,609.32 744,609.32 744,448.13 744,448.13 745,322.06 745,322.06 746,406.01 746,406.01
61 Kerosen/Minyak Tanah Liter 13,200 13,200 13,235.71 13,235.71 13,253.96 13,253.96 13,254.33 13,254.33 13,236.82 13,236.82 13,217.92 13,217.92 13,215.06 13,215.06 13,230.57 13,230.57 13,249.81 13,249.81
62 Minyak Fluks Liter 6,600 6,600 6,617.86 6,617.86 6,626.98 6,626.98 6,627.17 6,627.17 6,618.41 6,618.41 6,608.96 6,608.96 6,607.53 6,607.53 6,615.28 6,615.28 6,624.91 6,624.91
63 Minyak Pelumas/Olie Liter 40,300 40,300 40,409.04 40,409.04 40,464.75 40,464.75 40,465.87 40,465.87 40,412.43 40,412.43 40,354.70 40,354.70 40,345.97 40,345.97 40,393.33 40,393.33 40,452.07 40,452.07
64 Oxygen (Isi 6 M3) Botol 141,700 141,700 142,083.39 142,083.39 142,279.27 142,279.27 142,283.23 142,283.23 142,095.31 142,095.31 141,892.34 141,892.34 141,861.62 141,861.62 142,028.15 142,028.15 142,234.71 142,234.71
65 Polytene 125 Mikron Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
66 Sand Sheet Ton 1,140,100 1,140,100 1,143,184.72 1,143,184.72 1,144,760.70 1,144,760.70 1,144,792.56 1,144,792.56 1,143,280.58 1,143,280.58 1,141,647.50 1,141,647.50 1,141,400.37 1,141,400.37 1,142,740.29 1,142,740.29 1,144,402.22 1,144,402.22
67 Seal Coat M2 90,900 90,900 91,145.94 91,145.94 91,271.60 91,271.60 91,274.14 91,274.14 91,153.59 91,153.59 91,023.38 91,023.38 91,003.68 91,003.68 91,110.51 91,110.51 91,243.02 91,243.02
68 Seal Guard Kg 29,700 29,700 29,780.36 29,780.36 29,821.41 29,821.41 29,822.24 29,822.24 29,782.86 29,782.86 29,740.31 29,740.31 29,733.88 29,733.88 29,768.78 29,768.78 29,812.07 29,812.07
69 Semen/PC (50 kg) Zak 62,500 62,500 62,669.10 62,669.10 62,755.50 62,755.50 62,757.25 62,757.25 62,674.36 62,674.36 62,584.83 62,584.83 62,571.29 62,571.29 62,644.74 62,644.74 62,735.85 62,735.85
70 Semen/PC (kg) Kg 2,500 2,500 2,506.76 2,506.76 2,510.22 2,510.22 2,510.29 2,510.29 2,506.97 2,506.97 2,503.39 2,503.39 2,502.85 2,502.85 2,505.79 2,505.79 2,509.43 2,509.43
71 Slurry Seal Ton 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 14,400 14,400 14,438.96 14,438.96 14,458.87 14,458.87 14,459.27 14,459.27 14,440.17 14,440.17 14,419.55 14,419.55 14,416.42 14,416.42 14,433.35 14,433.35 14,454.34 14,454.34
75 Baja Prategang Kg 16,500 16,500 16,544.64 16,544.64 16,567.45 16,567.45 16,567.91 16,567.91 16,546.03 16,546.03 16,522.40 16,522.40 16,518.82 16,518.82 16,538.21 16,538.21 16,562.26 16,562.26
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,200 13,200 13,235.71 13,235.71 13,253.96 13,253.96 13,254.33 13,254.33 13,236.82 13,236.82 13,217.92 13,217.92 13,215.06 13,215.06 13,230.57 13,230.57 13,249.81 13,249.81
77 Baja Tulangan (Polos) U25 Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
78 Baja Tulangan (Polos) U32 Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
79 Baja Tulangan (Polos) U36 Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
80 Baja Tulangan (Ulir) D16 Kg 21,027 21,027 21,083.89 21,083.89 21,112.96 21,112.96 21,113.55 21,113.55 21,085.66 21,085.66 21,055.54 21,055.54 21,050.98 21,050.98 21,075.70 21,075.70 21,106.35 21,106.35
81 Baja Tulangan (Ulir) D19 Kg 21,027 21,027 21,083.89 21,083.89 21,112.96 21,112.96 21,113.55 21,113.55 21,085.66 21,085.66 21,055.54 21,055.54 21,050.98 21,050.98 21,075.70 21,075.70 21,106.35 21,106.35
82 Baja Tulangan (Ulir) D24 Kg 21,027 21,027 21,083.89 21,083.89 21,112.96 21,112.96 21,113.55 21,113.55 21,085.66 21,085.66 21,055.54 21,055.54 21,050.98 21,050.98 21,075.70 21,075.70 21,106.35 21,106.35
83 Baja Tulangan (Ulir) D32 Kg 21,027 21,027 21,083.89 21,083.89 21,112.96 21,112.96 21,113.55 21,113.55 21,085.66 21,085.66 21,055.54 21,055.54 21,050.98 21,050.98 21,075.70 21,075.70 21,106.35 21,106.35
84 Baja Tulangan (Ulir) D36 Kg 21,027 21,027 21,083.89 21,083.89 21,112.96 21,112.96 21,113.55 21,113.55 21,085.66 21,085.66 21,055.54 21,055.54 21,050.98 21,050.98 21,075.70 21,075.70 21,106.35 21,106.35
85 Besi Beton Kg 9,900 9,900 9,926.79 9,926.79 9,940.47 9,940.47 9,940.75 9,940.75 9,927.62 9,927.62 9,913.44 9,913.44 9,911.29 9,911.29 9,922.93 9,922.93 9,937.36 9,937.36
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,740,400 10,740,400 10,769,459.80 10,769,459.80 10,784,306.45 10,784,306.45 10,784,606.66 10,784,606.66 10,770,362.91 10,770,362.91 10,754,978.38 10,754,978.38 10,752,650.20 10,752,650.20 10,765,273.04 10,765,273.04 10,780,929.41 10,780,929.41
87 Box Culvert Type DUB 200×200 M' 11,401,400 11,401,400 11,432,248.24 11,432,248.24 11,448,008.60 11,448,008.60 11,448,327.29 11,448,327.29 11,433,206.93 11,433,206.93 11,416,875.58 11,416,875.58 11,414,404.12 11,414,404.12 11,427,803.81 11,427,803.81 11,444,423.72 11,444,423.72
88 Box Culvert Type uk 300×200 M' 12,310,200 12,310,200 12,343,507.13 12,343,507.13 12,360,523.75 12,360,523.75 12,360,867.84 12,360,867.84 12,344,542.24 12,344,542.24 12,326,909.14 12,326,909.14 12,324,240.67 12,324,240.67 12,338,708.45 12,338,708.45 12,356,653.12 12,356,653.12
89 Casing M2 11,100 11,100 11,130.03 11,130.03 11,145.38 11,145.38 11,145.69 11,145.69 11,130.97 11,130.97 11,115.07 11,115.07 11,112.66 11,112.66 11,125.71 11,125.71 11,141.89 11,141.89
90 Ducting (Kabel Prestress) M' 160,100 160,100 160,533.18 160,533.18 160,754.48 160,754.48 160,758.96 160,758.96 160,546.64 160,546.64 160,317.31 160,317.31 160,282.61 160,282.61 160,470.77 160,470.77 160,704.14 160,704.14
91 Ducting (Strand Prestress) M' 139,400 139,400 139,777.17 139,777.17 139,969.86 139,969.86 139,973.76 139,973.76 139,788.89 139,788.89 139,589.21 139,589.21 139,559.00 139,559.00 139,722.83 139,722.83 139,926.03 139,926.03
92 Expansion Cap M2 8,100 8,100 8,121.92 8,121.92 8,133.11 8,133.11 8,133.34 8,133.34 8,122.60 8,122.60 8,110.99 8,110.99 8,109.24 8,109.24 8,118.76 8,118.76 8,130.57 8,130.57
93 Expansion Join Baja Siku M' 1,797,900 1,797,900 1,802,764.49 1,802,764.49 1,805,249.76 1,805,249.76 1,805,300.02 1,805,300.02 1,802,915.67 1,802,915.67 1,800,340.36 1,800,340.36 1,799,950.64 1,799,950.64 1,802,063.65 1,802,063.65 1,804,684.46 1,804,684.46
94 Expansion Join Tipe Rubber M' 1,301,600 1,301,600 1,305,121.68 1,305,121.68 1,306,920.90 1,306,920.90 1,306,957.29 1,306,957.29 1,305,231.12 1,305,231.12 1,303,366.71 1,303,366.71 1,303,084.57 1,303,084.57 1,304,614.30 1,304,614.30 1,306,511.65 1,306,511.65
95 Expansion Join Tipe Torma M' 1,492,800 1,492,800 1,496,839.00 1,496,839.00 1,498,902.52 1,498,902.52 1,498,944.25 1,498,944.25 1,496,964.52 1,496,964.52 1,494,826.24 1,494,826.24 1,494,502.65 1,494,502.65 1,496,257.09 1,496,257.09 1,498,433.15 1,498,433.15
96 Expansion Tipe Joint Asphaltic Plug M' 1,771,000 1,771,000 1,775,791.71 1,775,791.71 1,778,239.80 1,778,239.80 1,778,289.30 1,778,289.30 1,775,940.63 1,775,940.63 1,773,403.85 1,773,403.85 1,773,019.95 1,773,019.95 1,775,101.35 1,775,101.35 1,777,682.95 1,777,682.95
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 34,300 34,300 34,392.80 34,392.80 34,440.22 34,440.22 34,441.18 34,441.18 34,395.69 34,395.69 34,346.56 34,346.56 34,339.12 34,339.12 34,379.43 34,379.43 34,429.43 34,429.43
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 26,500 26,500 26,571.70 26,571.70 26,608.33 26,608.33 26,609.07 26,609.07 26,573.93 26,573.93 26,535.97 26,535.97 26,530.23 26,530.23 26,561.37 26,561.37 26,600.00 26,600.00
99 Glass Bead Kg 57,800 57,800 57,956.39 57,956.39 58,036.28 58,036.28 58,037.90 58,037.90 57,961.25 57,961.25 57,878.45 57,878.45 57,865.93 57,865.93 57,933.86 57,933.86 58,018.11 58,018.11
100 Joint Sealent Kg 37,200 37,200 37,300.65 37,300.65 37,352.07 37,352.07 37,353.11 37,353.11 37,303.78 37,303.78 37,250.49 37,250.49 37,242.43 37,242.43 37,286.15 37,286.15 37,340.38 37,340.38
101 Joint Socket Pile 16×16×16 Set 75,400 75,400 75,604.01 75,604.01 75,708.23 75,708.23 75,710.34 75,710.34 75,610.35 75,610.35 75,502.34 75,502.34 75,486.00 75,486.00 75,574.61 75,574.61 75,684.53 75,684.53
102 Joint Socket Pile 35×35 Set 646,200 646,200 647,948.39 647,948.39 648,841.65 648,841.65 648,859.71 648,859.71 648,002.73 648,002.73 647,077.11 647,077.11 646,937.04 646,937.04 647,696.50 647,696.50 648,638.47 648,638.47
103 Kawat Beton Kg 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
104 Kawat Bronjong Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
105 Kawat Las Dos 148,700 148,700 149,102.33 149,102.33 149,307.88 149,307.88 149,312.04 149,312.04 149,114.83 149,114.83 148,901.84 148,901.84 148,869.60 148,869.60 149,044.37 149,044.37 149,261.13 149,261.13
106 Kayu Acuan (Kelas III/Meranti) M3 3,552,600 3,552,600 3,562,212.10 3,562,212.10 3,567,122.93 3,567,122.93 3,567,222.23 3,567,222.23 3,562,510.83 3,562,510.83 3,557,422.09 3,557,422.09 3,556,652.00 3,556,652.00 3,560,827.25 3,560,827.25 3,566,005.90 3,566,005.90
107 Kayu Perancah (Gelam) M3 2,288,532 2,288,532 2,294,723.97 2,294,723.97 2,297,887.45 2,297,887.45 2,297,951.42 2,297,951.42 2,294,916.41 2,294,916.41 2,291,638.32 2,291,638.32 2,291,142.24 2,291,142.24 2,293,831.87 2,293,831.87 2,297,167.88 2,297,167.88
108 Kerb Pracetak Type 1 (Peninggi) Buah 45,400 45,400 45,522.84 45,522.84 45,585.59 45,585.59 45,586.86 45,586.86 45,526.65 45,526.65 45,461.62 45,461.62 45,451.78 45,451.78 45,505.14 45,505.14 45,571.32 45,571.32
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 78,500 78,500 78,712.39 78,712.39 78,820.91 78,820.91 78,823.10 78,823.10 78,718.99 78,718.99 78,606.55 78,606.55 78,589.53 78,589.53 78,681.79 78,681.79 78,796.22 78,796.22
110 Marmer Nama Jembatan Buah 495,700 495,700 497,041.19 497,041.19 497,726.41 497,726.41 497,740.26 497,740.26 497,082.87 497,082.87 496,372.83 496,372.83 496,265.38 496,265.38 496,847.96 496,847.96 497,570.55 497,570.55
111 Mata Kucing Buah 130,100 130,100 130,452.01 130,452.01 130,631.85 130,631.85 130,635.48 130,635.48 130,462.95 130,462.95 130,276.59 130,276.59 130,248.39 130,248.39 130,401.29 130,401.29 130,590.94 130,590.94
112 Matras Concrete (Tebal=10 cm) M2 121,200 121,200 121,527.93 121,527.93 121,695.46 121,695.46 121,698.85 121,698.85 121,538.12 121,538.12 121,364.51 121,364.51 121,338.24 121,338.24 121,480.68 121,480.68 121,657.35 121,657.35
113 Mini Pile 16×16×16 M' 112,200 112,200 112,503.57 112,503.57 112,658.67 112,658.67 112,661.81 112,661.81 112,513.01 112,513.01 112,352.29 112,352.29 112,327.97 112,327.97 112,459.84 112,459.84 112,623.39 112,623.39
114 Mini Timber Pile Buah 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
115 Multipleks 12 mm Lbr 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
116 Paku Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
117 Paving Block (Model Bata 8 cm) M2 78,500 78,500 78,712.39 78,712.39 78,820.91 78,820.91 78,823.10 78,823.10 78,718.99 78,718.99 78,606.55 78,606.55 78,589.53 78,589.53 78,681.79 78,681.79 78,796.22 78,796.22
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 54,923,400 54,923,400 55,072,003.68 55,072,003.68 55,147,925.31 55,147,925.31 55,149,460.49 55,149,460.49 55,076,621.94 55,076,621.94 54,997,949.77 54,997,949.77 54,986,044.12 54,986,044.12 55,050,593.78 55,050,593.78 55,130,656.04 55,130,656.04
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 77,808,100 77,808,100 78,018,621.74 78,018,621.74 78,126,177.31 78,126,177.31 78,128,352.15 78,128,352.15 78,025,164.27 78,025,164.27 77,913,712.10 77,913,712.10 77,896,845.77 77,896,845.77 77,988,291.07 77,988,291.07 78,101,712.54 78,101,712.54
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 148,713,300 148,713,300 149,115,666.63 149,115,666.63 149,321,235.77 149,321,235.77 149,325,392.50 149,325,392.50 149,128,171.25 149,128,171.25 148,915,154.62 148,915,154.62 148,882,918.29 148,882,918.29 149,057,696.12 149,057,696.12 149,274,476.66 149,274,476.66
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 195,013,900 195,013,900 195,541,540.00 195,541,540.00 195,811,111.31 195,811,111.31 195,816,562.21 195,816,562.21 195,557,937.83 195,557,937.83 195,278,600.31 195,278,600.31 195,236,327.48 195,236,327.48 195,465,520.88 195,465,520.88 195,749,794.15 195,749,794.15
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 248,591,200 248,591,200 249,263,801.60 249,263,801.60 249,607,433.80 249,607,433.80 249,614,382.25 249,614,382.25 249,284,704.50 249,284,704.50 248,928,622.96 248,928,622.96 248,874,736.27 248,874,736.27 249,166,897.30 249,166,897.30 249,529,270.62 249,529,270.62
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 299,924,800 299,924,800 300,736,292.52 300,736,292.52 301,150,884.11 301,150,884.11 301,159,267.40 301,159,267.40 300,761,511.83 300,761,511.83 300,331,900.14 300,331,900.14 300,266,885.96 300,266,885.96 300,619,377.68 300,619,377.68 301,056,580.39 301,056,580.39
124 Pelat Rambu (Eng. Grade) Buah 173,500 173,500 173,969.43 173,969.43 174,209.26 174,209.26 174,214.11 174,214.11 173,984.02 173,984.02 173,735.50 173,735.50 173,697.89 173,697.89 173,901.80 173,901.80 174,154.71 174,154.71
125 Pelat Rambu (High L Grade) Buah 202,400 202,400 202,947.62 202,947.62 203,227.41 203,227.41 203,233.06 203,233.06 202,964.64 202,964.64 202,674.73 202,674.73 202,630.85 202,630.85 202,868.73 202,868.73 203,163.77 203,163.77
126 Pemantul Cahaya (Reflector) Buah 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
127 Pipa Baja D10" Kg 18,600 18,600 18,650.33 18,650.33 18,676.04 18,676.04 18,676.56 18,676.56 18,651.89 18,651.89 18,625.25 18,625.25 18,621.21 18,621.21 18,643.07 18,643.07 18,670.19 18,670.19
128 Pipa Drainase Baja Dia 3" M' 227,400 227,400 228,015.27 228,015.27 228,329.60 228,329.60 228,335.96 228,335.96 228,034.39 228,034.39 227,708.66 227,708.66 227,659.37 227,659.37 227,926.62 227,926.62 228,258.10 228,258.10
129 Pipa Galvanis Dia 1,5" M' 90,400 90,400 90,644.59 90,644.59 90,769.55 90,769.55 90,772.08 90,772.08 90,652.19 90,652.19 90,522.70 90,522.70 90,503.11 90,503.11 90,609.35 90,609.35 90,741.13 90,741.13
130 Pipa Galvanis Dia 2" M' 260,200 260,200 260,904.01 260,904.01 261,263.69 261,263.69 261,270.96 261,270.96 260,925.89 260,925.89 260,553.18 260,553.18 260,496.78 260,496.78 260,802.58 260,802.58 261,181.88 261,181.88
131 Pipa Galvanis Dia 3" M' 199,300 199,300 199,839.24 199,839.24 200,114.73 200,114.73 200,120.30 200,120.30 199,855.99 199,855.99 199,570.52 199,570.52 199,527.32 199,527.32 199,761.55 199,761.55 200,052.07 200,052.07
132 Pipa Porus M' 37,200 37,200 37,300.65 37,300.65 37,352.07 37,352.07 37,353.11 37,353.11 37,303.78 37,303.78 37,250.49 37,250.49 37,242.43 37,242.43 37,286.15 37,286.15 37,340.38 37,340.38
133 Pipa PVC Dia 4" M' 286,000 286,000 286,773.82 286,773.82 287,169.16 287,169.16 287,177.15 287,177.15 286,797.87 286,797.87 286,388.20 286,388.20 286,326.20 286,326.20 286,662.33 286,662.33 287,079.23 287,079.23
134 Plastik Filter M2 29,700 29,700 29,780.36 29,780.36 29,821.41 29,821.41 29,822.24 29,822.24 29,782.86 29,782.86 29,740.31 29,740.31 29,733.88 29,733.88 29,768.78 29,768.78 29,812.07 29,812.07
135 Rel Pengaman M' 140,500 140,500 140,880.14 140,880.14 141,074.36 141,074.36 141,078.29 141,078.29 140,891.96 140,891.96 140,690.71 140,690.71 140,660.25 140,660.25 140,825.38 140,825.38 141,030.18 141,030.18
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,697,000 1,697,000 1,701,591.49 1,701,591.49 1,703,937.29 1,703,937.29 1,703,984.72 1,703,984.72 1,701,734.19 1,701,734.19 1,699,303.41 1,699,303.41 1,698,935.55 1,698,935.55 1,700,929.98 1,700,929.98 1,703,403.71 1,703,403.71
137 Strip Bearing Buah 260,300 260,300 261,004.28 261,004.28 261,364.10 261,364.10 261,371.37 261,371.37 261,026.17 261,026.17 260,653.32 260,653.32 260,596.89 260,596.89 260,902.81 260,902.81 261,282.25 261,282.25
138 Tiang Pancang Baja Diameter 400 M' 601,300 601,300 602,926.91 602,926.91 603,758.10 603,758.10 603,774.90 603,774.90 602,977.47 602,977.47 602,116.17 602,116.17 601,985.83 601,985.83 602,692.51 602,692.51 603,569.03 603,569.03
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 734,800 734,800 736,788.11 736,788.11 737,803.84 737,803.84 737,824.38 737,824.38 736,849.90 736,849.90 735,797.37 735,797.37 735,638.09 735,638.09 736,501.68 736,501.68 737,572.80 737,572.80
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,536,700 1,536,700 1,540,857.78 1,540,857.78 1,542,981.99 1,542,981.99 1,543,024.94 1,543,024.94 1,540,986.99 1,540,986.99 1,538,785.83 1,538,785.83 1,538,452.72 1,538,452.72 1,540,258.75 1,540,258.75 1,542,498.81 1,542,498.81
HARGA SATUAN DASAR UPAH KABUPATEN PROBOLINGGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 99,512.77 99,512.77 99,412.19 99,412.19 99,267.58 99,267.58 99,213.02 99,213.02 99,297.05 99,297.05 99,439.60 99,439.60 99,508.19 99,508.19 99,356.49 99,356.49
2 Tukang OH 111,964.41 111,964.41 111,851.26 111,851.26 111,688.55 111,688.55 111,627.16 111,627.16 111,721.71 111,721.71 111,882.09 111,882.09 111,959.26 111,959.26 111,788.58 111,788.58
3 Mandor OH 128,633.56 128,633.56 128,503.55 128,503.55 128,316.62 128,316.62 128,246.09 128,246.09 128,354.72 128,354.72 128,538.97 128,538.97 128,627.63 128,627.63 128,431.55 128,431.55
4 Operator OH 265,501.27 265,501.27 265,232.93 265,232.93 264,847.11 264,847.11 264,701.54 264,701.54 264,925.74 264,925.74 265,306.05 265,306.05 265,489.04 265,489.04 265,084.31 265,084.31
5 Pembantu Operator OH 165,888.08 165,888.08 165,720.43 165,720.43 165,479.36 165,479.36 165,388.40 165,388.40 165,528.49 165,528.49 165,766.11 165,766.11 165,880.45 165,880.45 165,627.57 165,627.57
6 Sopir OH 124,416.06 124,416.06 124,290.32 124,290.32 124,109.52 124,109.52 124,041.30 124,041.30 124,146.37 124,146.37 124,324.58 124,324.58 124,410.34 124,410.34 124,220.68 124,220.68
7 Pembantu Sopir OH 107,847.34 107,847.34 107,738.34 107,738.34 107,581.62 107,581.62 107,522.48 107,522.48 107,613.56 107,613.56 107,768.04 107,768.04 107,842.37 107,842.37 107,677.97 107,677.97
8 Mekanik OH 149,319.36 149,319.36 149,168.45 149,168.45 148,951.46 148,951.46 148,869.59 148,869.59 148,995.68 148,995.68 149,209.57 149,209.57 149,312.48 149,312.48 149,084.86 149,084.86
9 Pembantu Mekanik OH 107,847.34 107,847.34 107,738.34 107,738.34 107,581.62 107,581.62 107,522.48 107,522.48 107,613.56 107,613.56 107,768.04 107,768.04 107,842.37 107,842.37 107,677.97 107,677.97
10 Kepala Tukang OH 124,416.06 124,416.06 124,290.32 124,290.32 124,109.52 124,109.52 124,041.30 124,041.30 124,146.37 124,146.37 124,324.58 124,324.58 124,410.34 124,410.34 124,220.68 124,220.68
11 Pemasak Aspal OH 124,416.06 124,416.06 124,290.32 124,290.32 124,109.52 124,109.52 124,041.30 124,041.30 124,146.37 124,146.37 124,324.58 124,324.58 124,410.34 124,410.34 124,220.68 124,220.68

HARGA SATUAN DASAR ALAT KABUPATEN PROBOLINGGO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 390,753.87 436,410.17 390,358.95 435,969.11 389,791.11 435,334.92 389,576.86 435,095.64 389,906.84 435,464.17 390,466.56 436,089.29 390,735.88 436,390.09 390,140.22 793,346.82
2 Asphalt Distribution Unit/Jam 240,591.56 309,483.70 240,348.40 309,170.92 239,998.77 308,721.17 239,866.86 308,551.49 240,070.03 308,812.84 240,414.65 309,256.14 240,580.48 309,469.45 240,213.72 529,189.56
3 Asphalt Finisher Unit/Jam 176,710.35 837,875.40 176,531.76 837,028.60 176,274.96 835,810.99 176,178.07 835,351.60 176,327.30 836,059.15 176,580.42 837,259.32 176,702.22 837,836.83 176,432.84 998,286.72
4 Asphalt Liquid Mixer Unit/Jam 63,051.58 115,278.16 62,987.86 115,161.65 62,896.23 114,994.13 62,861.66 114,930.92 62,914.90 115,028.27 63,005.22 115,193.40 63,048.68 115,272.85 62,952.56 172,802.58
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 84,621.86 84,621.86 84,536.33 84,536.33 84,413.36 84,413.36 84,366.96 84,366.96 84,438.42 84,438.42 84,559.64 84,559.64 84,617.96 84,617.96 84,488.96 161,935.77
6 Asphalt Mixing Plant Unit/Jam 945,773.70 5,869,421.62 944,817.85 5,863,489.65 943,443.45 5,854,960.17 942,924.89 5,851,742.05 943,723.56 5,856,698.55 945,078.29 5,865,105.92 945,730.17 5,869,151.44 944,288.43 6,725,785.99
7 Asphalt Sprayer Unit/Jam 77,984.85 78,911.31 77,906.03 78,831.56 77,792.71 78,716.89 77,749.95 78,673.62 77,815.80 78,740.26 77,927.51 78,853.29 77,981.26 78,907.68 77,862.38 150,159.93
8 Asphalt Tanker Unit/Jam 365,035.46 423,155.19 364,666.54 422,727.53 364,136.07 422,112.60 363,935.92 421,880.59 364,244.18 422,237.93 364,767.06 422,844.05 365,018.66 423,135.72 364,462.20 756,574.90
9 Blending Equipment Unit/Jam 118,636.53 187,477.63 118,516.62 187,288.16 118,344.22 187,015.71 118,279.18 186,912.92 118,379.36 187,071.24 118,549.29 187,339.78 118,631.06 187,469.00 118,450.22 295,760.59
10 Bore Pile Machine Unit/Jam 326,872.67 568,257.06 326,542.31 567,682.75 326,067.30 566,856.95 325,888.08 566,545.38 326,164.11 567,025.26 326,632.32 567,839.23 326,857.62 568,230.90 326,359.33 866,521.90
11 Bore Pile Machine Dia 60 Unit/Jam 214,043.52 647,084.02 213,827.20 646,430.04 213,516.15 645,489.70 213,398.79 645,134.91 213,579.54 645,681.35 213,886.14 646,608.23 214,033.67 647,054.24 213,707.38 841,962.67
12 Bore Pile Machine Dia 80 Unit/Jam 846,218.58 846,218.58 845,363.34 845,363.34 844,133.61 844,133.61 843,669.64 843,669.64 844,384.24 844,384.24 845,596.36 845,596.36 846,179.62 846,179.62 844,889.65 1,619,357.67
13 Bulldozer 100-150 HP Unit/Jam 331,850.42 488,060.41 331,515.03 487,567.15 331,032.79 486,857.90 330,850.84 486,590.30 331,131.07 487,002.45 331,606.42 487,701.55 331,835.15 488,037.95 331,329.27 791,006.90
14 Cement Tanker Unit/Jam 308,620.89 398,251.90 308,308.98 397,849.40 307,860.49 397,270.66 307,691.28 397,052.30 307,951.90 397,388.61 308,393.97 397,959.07 308,606.69 398,233.57 308,136.22 680,079.51
15 Cold Milling Unit/Jam 482,012.74 1,396,191.23 481,525.59 1,394,780.15 480,825.12 1,392,751.20 480,560.84 1,391,985.69 480,967.89 1,393,164.72 481,658.32 1,395,164.63 481,990.55 1,396,126.96 481,255.77 1,835,141.66
16 Cold Recycler Unit/Jam 4,059,360.29 4,059,360.29 4,055,257.66 4,055,257.66 4,049,358.58 4,049,358.58 4,047,132.89 4,047,132.89 4,050,560.86 4,050,560.86 4,056,375.50 4,056,375.50 4,059,173.43 4,059,173.43 4,052,985.33 7,768,153.99
17 Compressor 4000-6500 L\M Unit/Jam 123,614.28 152,505.57 123,489.35 152,351.44 123,309.71 152,129.82 123,241.94 152,046.20 123,346.33 152,174.99 123,523.39 152,393.44 123,608.59 152,498.55 123,420.15 265,399.15
18 Concrete Breaker Unit/Jam 450,486.95 858,661.62 450,031.66 857,793.81 449,377.01 856,546.00 449,130.01 856,075.20 449,510.43 856,800.31 450,155.71 858,030.26 450,466.21 858,622.09 449,779.49 1,269,603.48
19 Concrete Mixer (350) Unit/Jam 83,792.23 83,792.23 83,707.55 83,707.55 83,585.78 83,585.78 83,539.84 83,539.84 83,610.60 83,610.60 83,730.62 83,730.62 83,788.37 83,788.37 83,660.64 160,348.16
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 95,407.00 95,407.00 95,310.57 95,310.57 95,171.93 95,171.93 95,119.62 95,119.62 95,200.18 95,200.18 95,336.84 95,336.84 95,402.60 95,402.60 95,257.17 182,574.64
21 Concrete Pan Mixer Unit/Jam 253,865.57 543,454.18 253,609.00 542,904.93 253,240.08 542,115.18 253,100.89 541,817.21 253,315.27 542,276.14 253,678.91 543,054.59 253,853.89 543,429.16 253,466.89 774,941.13
22 Concrete Pump Unit/Jam 193,302.87 245,036.38 193,107.51 244,788.73 192,826.60 244,432.64 192,720.61 244,298.29 192,883.85 244,505.22 193,160.74 244,856.21 193,293.97 245,025.10 192,999.30 421,564.36
23 Concrete Vibrator Unit/Jam 72,177.47 72,177.47 72,104.52 72,104.52 71,999.63 71,999.63 71,960.06 71,960.06 72,021.01 72,021.01 72,124.40 72,124.40 72,174.14 72,174.14 72,064.12 138,121.68
24 Crane 10-15 Ton Unit/Jam 258,843.33 380,663.95 258,581.73 380,279.23 258,205.57 379,726.04 258,063.65 379,517.33 258,282.24 379,838.79 258,653.01 380,384.05 258,831.41 380,646.42 258,436.83 616,962.24
25 Crane On Track 35 Ton Unit/Jam 214,873.15 443,156.16 214,655.99 442,708.28 214,343.73 442,064.28 214,225.92 441,821.30 214,407.37 442,195.53 214,715.16 442,830.31 214,863.26 443,135.76 214,535.70 639,114.34
26 Crane On Track 75-100 Ton Unit/Jam 337,657.80 511,923.39 337,316.55 511,406.01 336,825.86 510,662.08 336,640.73 510,381.40 336,925.87 510,813.70 337,409.53 511,546.98 337,642.26 511,899.83 337,127.54 820,147.38
27 Dump Truck 10 Ton Unit/Jam 319,406.03 349,607.13 319,083.22 349,253.79 318,619.06 348,745.74 318,443.93 348,554.06 318,713.66 348,849.29 319,171.18 349,350.07 319,391.33 349,591.03 318,904.43 641,381.81
28 Dump Truck 3-4 M3 Unit/Jam 174,221.47 256,338.26 174,045.39 256,079.19 173,792.21 255,706.68 173,696.69 255,566.13 173,843.81 255,782.60 174,093.37 256,149.78 174,213.45 256,326.46 173,947.87 415,385.00
29 Excavator 80-140 HP Unit/Jam 252,206.32 450,660.28 251,951.43 450,204.82 251,584.92 449,549.92 251,446.64 449,302.83 251,659.62 449,683.39 252,020.88 450,328.92 252,194.71 450,639.54 251,810.25 680,774.39
30 Flat Bed Truck 3-4 M3 Unit/Jam 306,132.01 408,996.47 305,822.62 408,583.11 305,377.75 407,988.75 305,209.90 407,764.51 305,468.42 408,109.89 305,906.92 408,695.74 306,117.92 408,977.64 305,651.25 688,529.36
31 Fulvi Mixer Unit/Jam 766,574.47 1,197,165.69 765,799.73 1,195,955.77 764,685.74 1,194,216.04 764,265.44 1,193,559.65 764,912.78 1,194,570.61 766,010.82 1,196,285.43 766,539.19 1,197,110.58 765,370.62 1,896,862.54
32 Generator Set Unit/Jam 340,976.31 547,759.04 340,631.70 547,205.44 340,136.19 546,409.43 339,949.24 546,109.10 340,237.18 546,571.67 340,725.59 547,356.28 340,960.61 547,733.82 340,440.83 858,963.87
33 Hot Recycler Unit/Jam 2,504,641.06 7,344,664.75 2,502,109.72 7,337,241.80 2,498,469.97 7,326,568.49 2,497,096.71 7,322,541.52 2,499,211.78 7,328,743.81 2,502,799.43 7,339,264.32 2,504,525.77 7,344,326.65 2,500,707.69 9,625,403.93
34 Jack Hammer Unit/Jam 47,288.69 47,288.69 47,240.89 47,240.89 47,172.17 47,172.17 47,146.24 47,146.24 47,186.18 47,186.18 47,253.91 47,253.91 47,286.51 47,286.51 47,214.42 90,493.52
35 Launching Gantry Unit/Jam 60,180,244.41 60,180,244.41 60,119,422.77 60,119,422.77 60,031,968.49 60,031,968.49 59,998,972.57 59,998,972.57 60,049,792.45 60,049,792.45 60,135,994.75 60,135,994.75 60,177,474.17 60,177,474.17 60,085,735.35 115,163,319.45
36 Motor Grader > 100 HP Unit/Jam 236,443.43 524,024.59 236,204.46 523,494.98 235,860.86 522,733.46 235,731.22 522,446.15 235,930.89 522,888.67 236,269.57 523,639.28 236,432.54 524,000.47 236,072.11 739,597.12
37 Pedestrian Roller Unit/Jam 77,984.85 77,984.85 77,906.03 77,906.03 77,792.71 77,792.71 77,749.95 77,749.95 77,815.80 77,815.80 77,927.51 77,927.51 77,981.26 77,981.26 77,862.38 149,234.92
38 Pile Driver + Hammer Unit/Jam 88,769.99 259,677.11 88,680.27 259,414.66 88,551.27 259,037.30 88,502.60 258,894.92 88,577.56 259,114.21 88,704.72 259,486.17 88,765.90 259,665.15 88,630.58 340,512.52
39 Rock Drill Breaker Unit/Jam 86,281.11 280,463.33 86,193.91 280,179.87 86,068.52 279,772.30 86,021.22 279,618.53 86,094.08 279,855.37 86,217.67 280,257.11 86,277.14 280,450.42 86,145.61 358,988.24
40 Split Form Paver Unit/Jam 182,517.73 182,517.73 182,333.27 182,333.27 182,068.03 182,068.03 181,967.96 181,967.96 182,122.09 182,122.09 182,383.53 182,383.53 182,509.33 182,509.33 182,231.10 349,273.22
41 Stone Crusher Unit/Jam 488,649.75 716,508.99 488,155.89 715,784.84 487,445.78 714,743.61 487,177.86 714,350.76 487,590.51 714,955.82 488,290.45 715,982.15 488,627.25 716,476.01 487,882.35 1,162,601.08
42 Tamper Unit/Jam 73,007.09 73,007.09 72,933.31 72,933.31 72,827.21 72,827.21 72,787.18 72,787.18 72,848.84 72,848.84 72,953.41 72,953.41 73,003.73 73,003.73 72,892.44 139,709.29
43 Tandem Roller 6-8 T Unit/Jam 352,591.07 411,506.88 352,234.72 411,090.99 351,722.34 410,492.98 351,529.02 410,267.36 351,826.77 410,614.86 352,331.82 411,204.30 352,574.84 411,487.94 352,037.35 733,555.64
44 Three Wheel Roller 6-8 T Unit/Jam 116,977.27 185,044.54 116,859.05 184,857.52 116,689.06 184,588.62 116,624.92 184,487.16 116,723.70 184,643.42 116,891.26 184,908.48 116,971.89 185,036.02 116,793.57 291,812.76
45 Tire Roller 8-10 T Unit/Jam 209,065.77 377,465.68 208,854.47 377,084.19 208,550.66 376,535.66 208,436.03 376,328.70 208,612.58 376,647.45 208,912.04 377,188.14 209,056.14 377,448.30 208,737.44 568,212.05
46 Track Loader 75-100 HP Unit/Jam 195,791.75 416,900.25 195,593.87 416,478.91 195,309.34 415,873.06 195,202.00 415,644.48 195,367.33 415,996.54 195,647.79 416,593.71 195,782.74 416,881.06 195,484.27 595,436.18
47 Trailer 20 Ton Unit/Jam 316,087.53 451,697.58 315,768.07 451,241.07 315,308.73 450,584.66 315,135.42 450,337.00 315,402.35 450,718.45 315,855.11 451,365.46 316,072.98 451,676.79 315,591.13 740,274.81
48 Trailler 15 Ton Unit/Jam 273,776.60 416,427.29 273,499.90 416,006.42 273,102.05 415,401.27 272,951.94 415,172.95 273,183.14 415,524.60 273,575.29 416,121.10 273,764.00 416,408.12 273,346.65 666,336.50
49 Truck Mixer (agitator) Unit/Jam 344,294.81 506,099.24 343,946.85 505,587.74 343,446.52 504,852.28 343,257.75 504,574.79 343,548.49 505,002.17 344,041.66 505,727.11 344,278.96 506,075.94 343,754.12 820,406.63
50 Vibrating Rammer Unit/Jam 70,518.21 70,518.21 70,446.94 70,446.94 70,344.47 70,344.47 70,305.80 70,305.80 70,365.35 70,365.35 70,466.36 70,466.36 70,514.97 70,514.97 70,407.47 134,946.47
51 Vibratory Roller 5-8 T Unit/Jam 170,073.34 365,014.03 169,901.46 364,645.13 169,654.30 364,114.69 169,561.06 363,914.56 169,704.68 364,222.80 169,948.29 364,745.64 170,065.51 364,997.23 169,806.25 520,093.69
52 Water Pump 70-100 MM Unit/Jam 53,096.07 53,096.07 53,042.41 53,042.41 52,965.25 52,965.25 52,936.13 52,936.13 52,980.97 52,980.97 53,057.03 53,057.03 53,093.62 53,093.62 53,012.68 101,606.76
53 Water Tanker 3000-4500 L Unit/Jam 192,473.24 222,797.13 192,278.72 222,571.96 191,999.02 222,248.19 191,893.49 222,126.04 192,056.02 222,314.18 192,331.72 222,633.31 192,464.38 222,786.88 192,170.98 398,600.76
54 Welding Set Unit/Jam 107,851.39 107,851.39 107,742.39 107,742.39 107,585.66 107,585.66 107,526.52 107,526.52 107,617.60 107,617.60 107,772.09 107,772.09 107,846.42 107,846.42 107,682.01 206,388.72
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 187,495.49 428,805.63 187,305.99 428,372.26 187,033.53 427,749.11 186,930.72 427,514.01 187,089.06 427,876.12 187,357.63 428,490.34 187,486.86 428,785.89 187,201.04 599,730.04
HARGA SATUAN DASAR BAHAN KABUPATEN PROBOLINGGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 261,283.77 261,283.77 261,019.70 261,019.70 260,640.00 260,640.00 260,496.75 260,496.75 260,717.39 260,717.39 261,091.65 261,091.65 261,271.74 261,271.74 260,873.44 500,003.06
2 Agregat Pecah Mesin 20-30 mm M3 286,460.20 286,460.20 286,170.69 286,170.69 285,754.40 285,754.40 285,597.34 285,597.34 285,839.24 285,839.24 286,249.57 286,249.57 286,447.01 286,447.01 286,010.33 548,181.68
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 314,272.56 314,272.56 313,954.94 313,954.94 313,498.24 313,498.24 313,325.93 313,325.93 313,591.32 313,591.32 314,041.48 314,041.48 314,258.10 314,258.10 313,779.02 601,404.53
4 Bahan Agr. Base Kelas A M3 273,735.42 273,735.42 273,458.77 273,458.77 273,060.97 273,060.97 272,910.89 272,910.89 273,142.05 273,142.05 273,534.15 273,534.15 273,722.82 273,722.82 273,305.54 523,831.03
5 Bahan Agr. Base Kelas B M3 257,166.70 257,166.70 256,906.79 256,906.79 256,533.07 256,533.07 256,392.07 256,392.07 256,609.24 256,609.24 256,977.60 256,977.60 257,154.86 257,154.86 256,762.83 492,124.46
6 Bahan Agr. Base Kelas C M3 236,480.89 236,480.89 236,241.89 236,241.89 235,898.24 235,898.24 235,768.58 235,768.58 235,968.28 235,968.28 236,307.01 236,307.01 236,470.01 236,470.01 236,109.52 452,539.28
7 Bahan Agr. Base Kelas C2 M3 215,694.67 215,694.67 215,476.68 215,476.68 215,163.23 215,163.23 215,044.97 215,044.97 215,227.12 215,227.12 215,536.08 215,536.08 215,684.75 215,684.75 215,355.94 412,761.94
8 Bahan Agr. Base Kelas S M3 174,624.32 174,624.32 174,447.83 174,447.83 174,194.07 174,194.07 174,098.33 174,098.33 174,245.79 174,245.79 174,495.92 174,495.92 174,616.28 174,616.28 174,350.08 334,168.07
9 Bahan Pilihan M3 174,222.65 174,222.65 174,046.57 174,046.57 173,793.39 173,793.39 173,697.87 173,697.87 173,844.99 173,844.99 174,094.55 174,094.55 174,214.63 174,214.63 173,949.05 333,399.43
10 Bahan Tanah Timbunan M3 99,512.77 99,512.77 99,412.19 99,412.19 99,267.58 99,267.58 99,213.02 99,213.02 99,297.05 99,297.05 99,439.60 99,439.60 99,508.19 99,508.19 99,356.49 190,431.60
11 Batu Belah/Kerakal M3 281,166.24 281,166.24 280,882.08 280,882.08 280,473.49 280,473.49 280,319.33 280,319.33 280,556.76 280,556.76 280,959.50 280,959.50 281,153.30 281,153.30 280,724.69 538,050.95
12 Batu Kali M3 309,885.37 309,885.37 309,572.18 309,572.18 309,121.85 309,121.85 308,951.94 308,951.94 309,213.63 309,213.63 309,657.51 309,657.51 309,871.10 309,871.10 309,398.71 593,009.01
13 Chipping M3 184,665.97 184,665.97 184,479.34 184,479.34 184,210.98 184,210.98 184,109.73 184,109.73 184,265.67 184,265.67 184,530.19 184,530.19 184,657.47 184,657.47 184,375.97 353,384.18
14 Chipping (kg) Kg 301.25 301.25 300.95 300.95 300.51 300.51 300.34 300.34 300.60 300.60 301.03 301.03 301.24 301.24 300.78 576.48
15 Filler Cement Kg 1,658.88 1,658.88 1,657.20 1,657.20 1,654.79 1,654.79 1,653.88 1,653.88 1,655.28 1,655.28 1,657.66 1,657.66 1,658.80 1,658.80 1,656.28 3,174.50
16 Gebalan Rumput M' 5,522.91 5,522.91 5,517.33 5,517.33 5,509.30 5,509.30 5,506.27 5,506.27 5,510.94 5,510.94 5,518.85 5,518.85 5,522.65 5,522.65 5,514.23 10,568.86
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 331,173.67 331,173.67 330,838.96 330,838.96 330,357.70 330,357.70 330,176.12 330,176.12 330,455.79 330,455.79 330,930.16 330,930.16 331,158.42 331,158.42 330,653.58 633,747.16
18 Kapur M3 82,944.04 82,944.04 82,860.21 82,860.21 82,739.68 82,739.68 82,694.20 82,694.20 82,764.24 82,764.24 82,883.05 82,883.05 82,940.22 82,940.22 82,813.78 158,725.03
19 Pasir Beton (Kasar) M3 394,034.41 394,034.41 393,636.17 393,636.17 393,063.56 393,063.56 392,847.52 392,847.52 393,180.26 393,180.26 393,744.68 393,744.68 394,016.27 394,016.27 393,415.60 754,039.98
20 Pasir Halus (untuk HRS) M3 248,932.54 248,932.54 248,680.96 248,680.96 248,319.21 248,319.21 248,182.72 248,182.72 248,392.93 248,392.93 248,749.50 248,749.50 248,921.08 248,921.08 248,541.61 476,367.25
21 Pasir Pasang (Sedang) M3 278,555.41 278,555.41 278,273.89 278,273.89 277,869.09 277,869.09 277,716.36 277,716.36 277,951.59 277,951.59 278,350.60 278,350.60 278,542.59 278,542.59 278,117.96 533,054.76
22 Pasir Urug M3 169,201.83 169,201.83 169,030.82 169,030.82 168,784.94 168,784.94 168,692.17 168,692.17 168,835.05 168,835.05 169,077.42 169,077.42 169,194.04 169,194.04 168,936.11 323,791.38
23 Pasir Urug (ada unsur lempung) M3 132,750.63 132,750.63 132,616.47 132,616.47 132,423.55 132,423.55 132,350.77 132,350.77 132,462.87 132,462.87 132,653.02 132,653.02 132,744.52 132,744.52 132,542.16 254,036.91
24 Sirtu M3 215,379.37 215,379.37 215,161.69 215,161.69 214,848.70 214,848.70 214,730.61 214,730.61 214,912.49 214,912.49 215,221.00 215,221.00 215,369.45 215,369.45 215,041.13 412,158.56
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
26 Anti Pengelupas Liter 83,546.54 83,546.54 83,462.10 83,462.10 83,340.69 83,340.69 83,294.89 83,294.89 83,365.44 83,365.44 83,485.11 83,485.11 83,542.69 83,542.69 83,415.34 159,878.00
27 Arbocell Kg 117,788.57 117,788.57 117,669.53 117,669.53 117,498.36 117,498.36 117,433.78 117,433.78 117,533.24 117,533.24 117,701.96 117,701.96 117,783.15 117,783.15 117,603.59 225,404.92
28 Asbuton Curah Kg 12,150.40 12,150.40 12,138.12 12,138.12 12,120.46 12,120.46 12,113.80 12,113.80 12,124.06 12,124.06 12,141.46 12,141.46 12,149.84 12,149.84 12,131.32 23,251.49
29 Aspal Emulsi (CRS-1/53 R-65) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
30 Aspal Emulsi (CSS-1) Kg 8,133.74 8,133.74 8,125.52 8,125.52 8,113.70 8,113.70 8,109.24 8,109.24 8,116.11 8,116.11 8,127.76 8,127.76 8,133.36 8,133.36 8,120.96 15,565.05
31 Aspal Minyak (Drum) Kg 8,334.57 8,334.57 8,326.15 8,326.15 8,314.04 8,314.04 8,309.47 8,309.47 8,316.50 8,316.50 8,328.44 8,328.44 8,334.19 8,334.19 8,321.48 15,949.37
32 Aspal Modifikasi (BNA) Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
33 Aspal Modifikasi (JAP-57) Kg 13,455.81 13,455.81 13,442.21 13,442.21 13,422.66 13,422.66 13,415.28 13,415.28 13,426.65 13,426.65 13,445.92 13,445.92 13,455.19 13,455.19 13,434.68 25,749.58
34 Aspal Modifikasi (Retona) Kg 9,941.23 9,941.23 9,931.19 9,931.19 9,916.74 9,916.74 9,911.29 9,911.29 9,919.69 9,919.69 9,933.93 9,933.93 9,940.78 9,940.78 9,925.62 19,023.94
35 Aspal Modifikasi (Starbit) Kg 13,254.98 13,254.98 13,241.58 13,241.58 13,222.32 13,222.32 13,215.05 13,215.05 13,226.25 13,226.25 13,245.23 13,245.23 13,254.37 13,254.37 13,234.16 25,365.26
36 Aspal Minyak (Curah) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
37 Assetilline Botol 129,236.05 129,236.05 129,105.44 129,105.44 128,917.63 128,917.63 128,846.78 128,846.78 128,955.91 128,955.91 129,141.03 129,141.03 129,230.11 129,230.11 129,033.10 247,311.28
38 Bahan Pengawet: Kreosot Liter 8,736.24 8,736.24 8,727.41 8,727.41 8,714.71 8,714.71 8,709.92 8,709.92 8,717.30 8,717.30 8,729.81 8,729.81 8,735.83 8,735.83 8,722.52 16,718.01
39 Bensin Liter 9,539.57 9,539.57 9,529.93 9,529.93 9,516.06 9,516.06 9,510.83 9,510.83 9,518.89 9,518.89 9,532.55 9,532.55 9,539.13 9,539.13 9,524.59 18,255.30
40 Beton B-0 M3 489,479.37 489,479.37 488,984.68 488,984.68 488,273.36 488,273.36 488,004.99 488,004.99 488,418.33 488,418.33 489,119.47 489,119.47 489,456.84 489,456.84 488,710.68 936,687.28
41 Beton K-125 (fc' 10 MPa) M3 506,071.89 506,071.89 505,560.43 505,560.43 504,825.00 504,825.00 504,547.53 504,547.53 504,974.89 504,974.89 505,699.79 505,699.79 506,048.60 506,048.60 505,277.14 968,439.39
42 Beton K-175 (fc' 15 MPa) M3 547,553.20 547,553.20 546,999.81 546,999.81 546,204.10 546,204.10 545,903.88 545,903.88 546,366.27 546,366.27 547,150.59 547,150.59 547,527.99 547,527.99 546,693.30 1,047,819.67
43 Beton K-250 (fc' 20 MPa) M3 609,775.15 609,775.15 609,158.88 609,158.88 608,272.75 608,272.75 607,938.42 607,938.42 608,453.35 608,453.35 609,326.79 609,326.79 609,747.08 609,747.08 608,817.54 1,166,890.08
44 Beton K-300 (fc' 25 MPa) M3 634,663.93 634,663.93 634,022.50 634,022.50 633,100.21 633,100.21 632,752.23 632,752.23 633,288.18 633,288.18 634,197.27 634,197.27 634,634.72 634,634.72 633,667.23 1,214,518.25
45 Beton K-350 (fc' 30 MPa) M3 659,552.71 659,552.71 658,886.13 658,886.13 657,927.67 657,927.67 657,566.04 657,566.04 658,123.01 658,123.01 659,067.75 659,067.75 659,522.35 659,522.35 658,516.93 1,262,146.42
46 Beton K-400 (fc' 35 MPa) M3 684,441.50 684,441.50 683,749.76 683,749.76 682,755.12 682,755.12 682,379.86 682,379.86 682,957.84 682,957.84 683,938.24 683,938.24 684,409.99 684,409.99 683,366.63 1,309,774.58
47 Beton K-450 (fc' 40 MPa) M3 717,626.54 717,626.54 716,901.26 716,901.26 715,858.40 715,858.40 715,464.94 715,464.94 716,070.95 716,070.95 717,098.88 717,098.88 717,593.50 717,593.50 716,499.55 1,373,278.81
48 Beton K-500 (fc' 45 MPa) M3 746,663.45 746,663.45 745,908.83 745,908.83 744,823.77 744,823.77 744,414.39 744,414.39 745,044.92 745,044.92 746,114.44 746,114.44 746,629.08 746,629.08 745,490.86 1,428,845.00
49 Bunker Oil Liter 3,514.58 3,514.58 3,511.03 3,511.03 3,505.92 3,505.92 3,503.99 3,503.99 3,506.96 3,506.96 3,511.99 3,511.99 3,514.42 3,514.42 3,509.06 6,725.64
50 Cat Kg 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30 95,245.88 182,553.00
51 Cat Anti Karat Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
52 Cat Marka (Non Thermoplas) Kg 58,241.58 58,241.58 58,182.72 58,182.72 58,098.08 58,098.08 58,066.15 58,066.15 58,115.33 58,115.33 58,198.75 58,198.75 58,238.90 58,238.90 58,150.11 111,453.41
53 Cat Marka (Thermoplastic) Kg 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
54 Cerucuk Diameter 10-15 cm M' 20,786.22 20,786.22 20,765.21 20,765.21 20,735.00 20,735.00 20,723.61 20,723.61 20,741.16 20,741.16 20,770.93 20,770.93 20,785.26 20,785.26 20,753.58 39,777.34
55 Cold Mix (Aspal Dingin) Kg 6,225.82 6,225.82 6,219.53 6,219.53 6,210.48 6,210.48 6,207.07 6,207.07 6,212.33 6,212.33 6,221.25 6,221.25 6,225.54 6,225.54 6,216.05 11,913.99
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,082,690.87 1,082,690.87 1,081,596.64 1,081,596.64 1,080,023.26 1,080,023.26 1,079,429.64 1,079,429.64 1,080,343.93 1,080,343.93 1,081,894.78 1,081,894.78 1,082,641.03 1,082,641.03 1,080,990.57 2,071,880.49
57 Curing Compound Liter 41,472.02 41,472.02 41,430.11 41,430.11 41,369.84 41,369.84 41,347.10 41,347.10 41,382.12 41,382.12 41,441.53 41,441.53 41,470.11 41,470.11 41,406.89 79,362.52
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 506,099.24 506,099.24 505,587.74 505,587.74 504,852.28 504,852.28 504,574.79 504,574.79 505,002.17 505,002.17 505,727.11 505,727.11 506,075.94 506,075.94 505,304.44 968,491.71
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 589,043.28 589,043.28 588,447.96 588,447.96 587,591.96 587,591.96 587,268.99 587,268.99 587,766.42 587,766.42 588,610.16 588,610.16 589,016.16 589,016.16 588,118.22 1,127,216.74
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 746,697.21 746,697.21 745,942.55 745,942.55 744,857.45 744,857.45 744,448.04 744,448.04 745,078.60 745,078.60 746,148.17 746,148.17 746,662.83 746,662.83 745,524.57 1,428,909.60
61 Kerosen/Minyak Tanah Liter 13,254.98 13,254.98 13,241.58 13,241.58 13,222.32 13,222.32 13,215.05 13,215.05 13,226.25 13,226.25 13,245.23 13,245.23 13,254.37 13,254.37 13,234.16 25,365.26
62 Minyak Fluks Liter 6,627.49 6,627.49 6,620.79 6,620.79 6,611.16 6,611.16 6,607.53 6,607.53 6,613.12 6,613.12 6,622.62 6,622.62 6,627.18 6,627.18 6,617.08 12,682.63
63 Minyak Pelumas/Olie Liter 40,467.86 40,467.86 40,426.96 40,426.96 40,368.15 40,368.15 40,345.96 40,345.96 40,380.13 40,380.13 40,438.10 40,438.10 40,465.99 40,465.99 40,404.30 77,440.90
64 Oxygen (Isi 6 M3) Botol 142,290.20 142,290.20 142,146.40 142,146.40 141,939.62 141,939.62 141,861.60 141,861.60 141,981.76 141,981.76 142,185.58 142,185.58 142,283.65 142,283.65 142,066.74 272,292.21
65 Polytene 125 Mikron Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
66 Sand Sheet Ton 1,144,848.69 1,144,848.69 1,143,691.64 1,143,691.64 1,142,027.94 1,142,027.94 1,141,400.23 1,141,400.23 1,142,367.01 1,142,367.01 1,144,006.90 1,144,006.90 1,144,795.99 1,144,795.99 1,143,050.78 2,190,828.18
67 Seal Coat M2 91,278.61 91,278.61 91,186.36 91,186.36 91,053.71 91,053.71 91,003.67 91,003.67 91,080.75 91,080.75 91,211.50 91,211.50 91,274.41 91,274.41 91,135.27 174,674.40
68 Seal Guard Kg 29,823.70 29,823.70 29,793.56 29,793.56 29,750.22 29,750.22 29,733.87 29,733.87 29,759.06 29,759.06 29,801.78 29,801.78 29,822.33 29,822.33 29,776.87 57,071.83
69 Semen/PC (50 kg) Zak 62,760.32 62,760.32 62,696.89 62,696.89 62,605.69 62,605.69 62,571.28 62,571.28 62,624.28 62,624.28 62,714.18 62,714.18 62,757.43 62,757.43 62,661.76 120,100.66
70 Semen/PC (kg) Kg 2,510.41 2,510.41 2,507.88 2,507.88 2,504.23 2,504.23 2,502.85 2,502.85 2,504.97 2,504.97 2,508.57 2,508.57 2,510.30 2,510.30 2,506.47 4,804.03
71 Slurry Seal Ton 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 14,459.98 14,459.98 14,445.36 14,445.36 14,424.35 14,424.35 14,416.42 14,416.42 14,428.63 14,428.63 14,449.35 14,449.35 14,459.31 14,459.31 14,437.27 27,671.19
75 Baja Prategang Kg 16,568.72 16,568.72 16,551.98 16,551.98 16,527.90 16,527.90 16,518.82 16,518.82 16,532.81 16,532.81 16,556.54 16,556.54 16,567.96 16,567.96 16,542.70 31,706.57
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,254.98 13,254.98 13,241.58 13,241.58 13,222.32 13,222.32 13,215.05 13,215.05 13,226.25 13,226.25 13,245.23 13,245.23 13,254.37 13,254.37 13,234.16 25,365.26
77 Baja Tulangan (Polos) U25 Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
78 Baja Tulangan (Polos) U32 Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
79 Baja Tulangan (Polos) U36 Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
80 Baja Tulangan (Ulir) D16 Kg 21,114.58 21,114.58 21,093.24 21,093.24 21,062.56 21,062.56 21,050.98 21,050.98 21,068.81 21,068.81 21,099.06 21,099.06 21,113.61 21,113.61 21,081.42 40,405.70
81 Baja Tulangan (Ulir) D19 Kg 21,114.58 21,114.58 21,093.24 21,093.24 21,062.56 21,062.56 21,050.98 21,050.98 21,068.81 21,068.81 21,099.06 21,099.06 21,113.61 21,113.61 21,081.42 40,405.70
82 Baja Tulangan (Ulir) D24 Kg 21,114.58 21,114.58 21,093.24 21,093.24 21,062.56 21,062.56 21,050.98 21,050.98 21,068.81 21,068.81 21,099.06 21,099.06 21,113.61 21,113.61 21,081.42 40,405.70
83 Baja Tulangan (Ulir) D32 Kg 21,114.58 21,114.58 21,093.24 21,093.24 21,062.56 21,062.56 21,050.98 21,050.98 21,068.81 21,068.81 21,099.06 21,099.06 21,113.61 21,113.61 21,081.42 40,405.70
84 Baja Tulangan (Ulir) D36 Kg 21,114.58 21,114.58 21,093.24 21,093.24 21,062.56 21,062.56 21,050.98 21,050.98 21,068.81 21,068.81 21,099.06 21,099.06 21,113.61 21,113.61 21,081.42 40,405.70
85 Besi Beton Kg 9,941.23 9,941.23 9,931.19 9,931.19 9,916.74 9,916.74 9,911.29 9,911.29 9,919.69 9,919.69 9,933.93 9,933.93 9,940.78 9,940.78 9,925.62 19,023.94
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,785,135.39 10,785,135.39 10,774,235.30 10,774,235.30 10,758,562.28 10,758,562.28 10,752,648.96 10,752,648.96 10,761,756.58 10,761,756.58 10,777,205.23 10,777,205.23 10,784,638.92 10,784,638.92 10,768,198.05 20,638,865.86
87 Box Culvert Type DUB 200×200 M' 11,448,888.55 11,448,888.55 11,437,317.64 11,437,317.64 11,420,680.05 11,420,680.05 11,414,402.80 11,414,402.80 11,424,070.94 11,424,070.94 11,440,470.35 11,440,470.35 11,448,361.53 11,448,361.53 11,430,908.84 21,909,050.43
88 Box Culvert Type uk 300×200 M' 12,361,473.84 12,361,473.84 12,348,980.62 12,348,980.62 12,331,016.85 12,331,016.85 12,324,239.24 12,324,239.24 12,334,678.03 12,334,678.03 12,352,384.63 12,352,384.63 12,360,904.81 12,360,904.81 12,342,060.97 23,655,410.09
89 Casing M2 11,146.23 11,146.23 11,134.97 11,134.97 11,118.77 11,118.77 11,112.66 11,112.66 11,122.07 11,122.07 11,138.04 11,138.04 11,145.72 11,145.72 11,128.73 21,329.88
90 Ducting (Kabel Prestress) M' 160,766.84 160,766.84 160,604.36 160,604.36 160,370.73 160,370.73 160,282.59 160,282.59 160,418.35 160,418.35 160,648.63 160,648.63 160,759.44 160,759.44 160,514.37 307,649.85
91 Ducting (Strand Prestress) M' 139,980.62 139,980.62 139,839.15 139,839.15 139,635.73 139,635.73 139,558.98 139,558.98 139,677.19 139,677.19 139,877.70 139,877.70 139,974.18 139,974.18 139,760.79 267,872.51
92 Expansion Cap M2 8,133.74 8,133.74 8,125.52 8,125.52 8,113.70 8,113.70 8,109.24 8,109.24 8,116.11 8,116.11 8,127.76 8,127.76 8,133.36 8,133.36 8,120.96 15,565.05
93 Expansion Join Baja Siku M' 1,805,388.52 1,805,388.52 1,803,563.89 1,803,563.89 1,800,940.29 1,800,940.29 1,799,950.43 1,799,950.43 1,801,475.01 1,801,475.01 1,804,061.05 1,804,061.05 1,805,305.42 1,805,305.42 1,802,553.28 3,454,863.59
94 Expansion Join Tipe Rubber M' 1,307,021.36 1,307,021.36 1,305,700.41 1,305,700.41 1,303,801.04 1,303,801.04 1,303,084.42 1,303,084.42 1,304,188.15 1,304,188.15 1,306,060.33 1,306,060.33 1,306,961.19 1,306,961.19 1,304,968.77 2,501,168.28
95 Expansion Join Tipe Torma M' 1,499,017.74 1,499,017.74 1,497,502.74 1,497,502.74 1,495,324.36 1,495,324.36 1,494,502.47 1,494,502.47 1,495,768.34 1,495,768.34 1,497,915.53 1,497,915.53 1,498,948.73 1,498,948.73 1,496,663.63 2,868,580.22
96 Expansion Tipe Joint Asphaltic Plug M' 1,778,376.48 1,778,376.48 1,776,579.15 1,776,579.15 1,773,994.80 1,773,994.80 1,773,019.75 1,773,019.75 1,774,521.52 1,774,521.52 1,777,068.87 1,777,068.87 1,778,294.62 1,778,294.62 1,775,583.66 3,403,172.27
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 34,442.86 34,442.86 34,408.05 34,408.05 34,358.00 34,358.00 34,339.12 34,339.12 34,368.20 34,368.20 34,417.54 34,417.54 34,441.28 34,441.28 34,388.77 65,911.24
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 26,610.38 26,610.38 26,583.48 26,583.48 26,544.81 26,544.81 26,530.22 26,530.22 26,552.69 26,552.69 26,590.81 26,590.81 26,609.15 26,609.15 26,568.59 50,922.68
99 Glass Bead Kg 58,040.75 58,040.75 57,982.09 57,982.09 57,897.74 57,897.74 57,865.92 57,865.92 57,914.93 57,914.93 57,998.07 57,998.07 58,038.07 58,038.07 57,949.60 111,069.09
100 Joint Sealent Kg 37,354.94 37,354.94 37,317.19 37,317.19 37,262.91 37,262.91 37,242.42 37,242.42 37,273.97 37,273.97 37,327.48 37,327.48 37,353.22 37,353.22 37,296.28 71,483.91
101 Joint Socket Pile 16×16×16 Set 75,714.05 75,714.05 75,637.53 75,637.53 75,527.50 75,527.50 75,485.99 75,485.99 75,549.93 75,549.93 75,658.38 75,658.38 75,710.57 75,710.57 75,595.15 144,889.43
102 Joint Socket Pile 35×35 Set 648,891.52 648,891.52 648,235.71 648,235.71 647,292.74 647,292.74 646,936.96 646,936.96 647,484.93 647,484.93 648,414.40 648,414.40 648,861.65 648,861.65 647,872.48 1,241,744.73
103 Kawat Beton Kg 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
104 Kawat Bronjong Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
105 Kawat Las Dos 149,319.36 149,319.36 149,168.45 149,168.45 148,951.46 148,951.46 148,869.59 148,869.59 148,995.68 148,995.68 149,209.57 149,209.57 149,312.48 149,312.48 149,084.86 285,743.49
106 Kayu Acuan (Kelas III/Meranti) M3 3,567,397.11 3,567,397.11 3,563,791.70 3,563,791.70 3,558,607.53 3,558,607.53 3,556,651.58 3,556,651.58 3,559,664.11 3,559,664.11 3,564,774.06 3,564,774.06 3,567,232.90 3,567,232.90 3,561,794.76 6,826,713.61
107 Kayu Perancah (Gelam) M3 2,298,064.08 2,298,064.08 2,295,741.52 2,295,741.52 2,292,401.96 2,292,401.96 2,291,141.97 2,291,141.97 2,293,082.60 2,293,082.60 2,296,374.35 2,296,374.35 2,297,958.30 2,297,958.30 2,294,455.12 4,397,667.22
108 Kerb Pracetak Type 1 (Peninggi) Buah 45,589.10 45,589.10 45,543.02 45,543.02 45,476.77 45,476.77 45,451.78 45,451.78 45,490.27 45,490.27 45,555.58 45,555.58 45,587.00 45,587.00 45,517.50 87,241.12
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 78,826.96 78,826.96 78,747.30 78,747.30 78,632.75 78,632.75 78,589.53 78,589.53 78,656.09 78,656.09 78,769.00 78,769.00 78,823.34 78,823.34 78,703.17 150,846.43
110 Marmer Nama Jembatan Buah 497,764.67 497,764.67 497,261.60 497,261.60 496,538.24 496,538.24 496,265.32 496,265.32 496,685.67 496,685.67 497,398.67 497,398.67 497,741.75 497,741.75 496,982.96 952,542.35
111 Mata Kucing Buah 130,641.89 130,641.89 130,509.85 130,509.85 130,320.00 130,320.00 130,248.37 130,248.37 130,358.70 130,358.70 130,545.83 130,545.83 130,635.87 130,635.87 130,436.72 250,001.53
112 Matras Concrete (Tebal=10 cm) M2 121,704.82 121,704.82 121,581.81 121,581.81 121,404.95 121,404.95 121,338.22 121,338.22 121,441.00 121,441.00 121,615.33 121,615.33 121,699.21 121,699.21 121,513.69 232,899.20
113 Mini Pile 16×16×16 M' 112,667.33 112,667.33 112,553.46 112,553.46 112,389.73 112,389.73 112,327.96 112,327.96 112,423.10 112,423.10 112,584.49 112,584.49 112,662.14 112,662.14 112,490.39 215,604.70
114 Mini Timber Pile Buah 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
115 Multipleks 12 mm Lbr 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 78,826.96 78,826.96 78,747.30 78,747.30 78,632.75 78,632.75 78,589.53 78,589.53 78,656.09 78,656.09 78,769.00 78,769.00 78,823.34 78,823.34 78,703.17 150,846.43
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 55,152,164.24 55,152,164.24 55,096,424.27 55,096,424.27 55,016,276.83 55,016,276.83 54,986,037.73 54,986,037.73 55,032,611.59 55,032,611.59 55,111,611.66 55,111,611.66 55,149,625.46 55,149,625.46 55,065,551.45 105,541,384.41
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 78,132,182.47 78,132,182.47 78,053,217.56 78,053,217.56 77,939,675.42 77,939,675.42 77,896,836.73 77,896,836.73 77,962,816.32 77,962,816.32 78,074,733.01 78,074,733.01 78,128,585.86 78,128,585.86 78,009,481.09 149,516,865.16
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 149,332,713.32 149,332,713.32 149,181,789.02 149,181,789.02 148,964,777.87 148,964,777.87 148,882,901.01 148,882,901.01 149,009,006.67 149,009,006.67 149,222,911.14 149,222,911.14 149,325,839.18 149,325,839.18 149,098,196.26 285,769,044.92
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 195,826,162.30 195,826,162.30 195,628,249.03 195,628,249.03 195,343,673.33 195,343,673.33 195,236,304.81 195,236,304.81 195,401,672.38 195,401,672.38 195,682,174.16 195,682,174.16 195,817,147.96 195,817,147.96 195,518,630.38 374,740,765.95
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 249,626,619.84 249,626,619.84 249,374,332.70 249,374,332.70 249,011,573.87 249,011,573.87 248,874,707.38 248,874,707.38 249,085,507.34 249,085,507.34 249,443,073.00 249,443,073.00 249,615,128.93 249,615,128.93 249,234,597.89 477,695,470.41
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 301,174,032.02 301,174,032.02 300,869,648.08 300,869,648.08 300,431,980.25 300,431,980.25 300,266,851.10 300,266,851.10 300,521,180.84 300,521,180.84 300,952,583.12 300,952,583.12 301,160,168.26 301,160,168.26 300,701,058.31 576,338,657.29
124 Pelat Rambu (Eng. Grade) Buah 174,222.65 174,222.65 174,046.57 174,046.57 173,793.39 173,793.39 173,697.87 173,697.87 173,844.99 173,844.99 174,094.55 174,094.55 174,214.63 174,214.63 173,949.05 333,399.43
125 Pelat Rambu (High L Grade) Buah 203,243.03 203,243.03 203,037.62 203,037.62 202,742.26 202,742.26 202,630.83 202,630.83 202,802.46 202,802.46 203,093.58 203,093.58 203,233.67 203,233.67 202,923.85 388,933.97
126 Pemantul Cahaya (Reflector) Buah 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
127 Pipa Baja D10" Kg 18,677.47 18,677.47 18,658.60 18,658.60 18,631.45 18,631.45 18,621.21 18,621.21 18,636.98 18,636.98 18,663.74 18,663.74 18,676.61 18,676.61 18,648.14 35,741.96
128 Pipa Drainase Baja Dia 3" M' 228,347.16 228,347.16 228,116.37 228,116.37 227,784.54 227,784.54 227,659.34 227,659.34 227,852.17 227,852.17 228,179.25 228,179.25 228,336.64 228,336.64 227,988.55 436,974.24
129 Pipa Galvanis Dia 1,5" M' 90,776.53 90,776.53 90,684.79 90,684.79 90,552.87 90,552.87 90,503.10 90,503.10 90,579.75 90,579.75 90,709.78 90,709.78 90,772.35 90,772.35 90,633.97 173,713.59
130 Pipa Galvanis Dia 2" M' 261,283.77 261,283.77 261,019.70 261,019.70 260,640.00 260,640.00 260,496.75 260,496.75 260,717.39 260,717.39 261,091.65 261,091.65 261,271.74 261,271.74 260,873.44 500,003.06
131 Pipa Galvanis Dia 3" M' 200,130.11 200,130.11 199,927.85 199,927.85 199,637.02 199,637.02 199,527.29 199,527.29 199,696.30 199,696.30 199,982.96 199,982.96 200,120.90 200,120.90 199,815.82 382,976.98
132 Pipa Porus M' 37,354.94 37,354.94 37,317.19 37,317.19 37,262.91 37,262.91 37,242.42 37,242.42 37,273.97 37,273.97 37,327.48 37,327.48 37,353.22 37,353.22 37,296.28 71,483.91
133 Pipa PVC Dia 4" M' 287,191.23 287,191.23 286,900.98 286,900.98 286,483.63 286,483.63 286,326.17 286,326.17 286,568.69 286,568.69 286,980.07 286,980.07 287,178.01 287,178.01 286,740.22 549,580.61
134 Plastik Filter M2 29,823.70 29,823.70 29,793.56 29,793.56 29,750.22 29,750.22 29,733.87 29,733.87 29,759.06 29,759.06 29,801.78 29,801.78 29,822.33 29,822.33 29,776.87 57,071.83
135 Rel Pengaman M' 141,085.20 141,085.20 140,942.61 140,942.61 140,737.59 140,737.59 140,660.23 140,660.23 140,779.38 140,779.38 140,981.47 140,981.47 141,078.71 141,078.71 140,863.64 269,986.28
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,704,068.26 1,704,068.26 1,702,346.03 1,702,346.03 1,699,869.67 1,699,869.67 1,698,935.35 1,698,935.35 1,700,374.37 1,700,374.37 1,702,815.28 1,702,815.28 1,703,989.82 1,703,989.82 1,701,392.14 3,260,973.09
137 Strip Bearing Buah 261,384.19 261,384.19 261,120.02 261,120.02 260,740.17 260,740.17 260,596.86 260,596.86 260,817.59 260,817.59 261,192.00 261,192.00 261,372.16 261,372.16 260,973.70 500,195.22
138 Tiang Pancang Baja Diameter 400 M' 603,804.51 603,804.51 603,194.27 603,194.27 602,316.81 602,316.81 601,985.76 601,985.76 602,495.65 602,495.65 603,360.54 603,360.54 603,776.71 603,776.71 602,856.27 1,155,464.42
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 737,860.55 737,860.55 737,114.83 737,114.83 736,042.56 736,042.56 735,638.01 735,638.01 736,261.10 736,261.10 737,318.01 737,318.01 737,826.59 737,826.59 736,701.79 1,411,999.43
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,543,100.59 1,543,100.59 1,541,541.04 1,541,541.04 1,539,298.60 1,539,298.60 1,538,452.54 1,538,452.54 1,539,755.63 1,539,755.63 1,541,965.97 1,541,965.97 1,543,029.55 1,543,029.55 1,540,677.25 2,952,938.92
HARGA SATUAN DASAR UPAH KABUPATEN LUMAJANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
2 Tukang OH 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
3 Mandor OH 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
4 Operator OH 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
5 Pembantu Operator OH 176,000 176,000 176,476.19 176,476.19 176,719.48 176,719.48 176,724.40 176,724.40 176,490.99 176,490.99 176,238.89 176,238.89 176,200.74 176,200.74 176,407.59 176,407.59 176,664.14 176,664.14
6 Sopir OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
7 Pembantu Sopir OH 114,000 114,000 114,308.44 114,308.44 114,466.03 114,466.03 114,469.22 114,469.22 114,318.03 114,318.03 114,154.74 114,154.74 114,130.03 114,130.03 114,264.01 114,264.01 114,430.18 114,430.18
8 Mekanik OH 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
9 Pembantu Mekanik OH 114,000 114,000 114,308.44 114,308.44 114,466.03 114,466.03 114,469.22 114,469.22 114,318.03 114,318.03 114,154.74 114,154.74 114,130.03 114,130.03 114,264.01 114,264.01 114,430.18 114,430.18
10 Kepala Tukang OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
11 Pemasak Aspal OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11

HARGA SATUAN DASAR ALAT KABUPATEN LUMAJANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 414,831 463,000 415,953.38 464,252.72 416,526.81 464,892.73 416,538.41 464,905.67 415,988.27 464,291.65 415,394.06 463,628.45 415,304.14 463,528.09 415,791.68 464,072.23 416,396.38 464,747.15
2 Asphalt Distribution Unit/Jam 255,416 329,000 256,107.18 329,890.16 256,460.25 330,344.94 256,467.39 330,354.14 256,128.66 329,917.82 255,762.80 329,446.57 255,707.43 329,375.25 256,007.61 329,761.91 256,379.94 330,241.50
3 Asphalt Finisher Unit/Jam 187,599 890,000 188,106.31 892,408.03 188,365.63 893,638.29 188,370.87 893,663.17 188,122.08 892,482.87 187,853.37 891,208.03 187,812.70 891,015.11 188,033.18 892,061.10 188,306.64 893,358.46
4 Asphalt Liquid Mixer Unit/Jam 66,937 122,000 67,117.74 122,330.09 67,210.27 122,498.73 67,212.14 122,502.14 67,123.37 122,340.35 67,027.49 122,165.60 67,012.98 122,139.15 67,091.65 122,282.53 67,189.22 122,460.37
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 89,836 89,836 90,079.08 90,079.08 90,203.26 90,203.26 90,205.77 90,205.77 90,086.63 90,086.63 89,957.95 89,957.95 89,938.48 89,938.48 90,044.06 90,044.06 90,175.01 90,175.01
6 Asphalt Mixing Plant Unit/Jam 1,004,050 5,150,245 1,006,766.15 5,164,179.61 1,008,154.07 5,171,298.89 1,008,182.14 5,171,442.85 1,006,850.58 5,164,612.67 1,005,412.38 5,157,235.47 1,005,194.74 5,156,119.06 1,006,374.76 5,162,171.98 1,007,838.37 5,169,679.53
7 Asphalt Sprayer Unit/Jam 82,790 82,790 83,014.05 83,014.05 83,128.49 83,128.49 83,130.81 83,130.81 83,021.01 83,021.01 82,902.42 82,902.42 82,884.48 82,884.48 82,981.78 82,981.78 83,102.46 83,102.46
8 Asphalt Tanker Unit/Jam 387,528 449,000 388,576.41 450,214.84 389,112.10 450,835.50 389,122.93 450,848.05 388,609.00 450,252.59 388,053.90 449,609.45 387,969.90 449,512.12 388,425.35 450,039.81 388,990.25 450,694.32
9 Blending Equipment Unit/Jam 125,947 199,000 126,287.33 199,538.43 126,461.43 199,813.51 126,464.95 199,819.07 126,297.92 199,555.16 126,117.52 199,270.11 126,090.22 199,226.97 126,238.24 199,460.85 126,421.83 199,750.94
10 Bore Pile Machine Unit/Jam 347,014 603,000 347,952.51 604,631.51 348,432.20 605,465.05 348,441.90 605,481.90 347,981.69 604,682.21 347,484.63 603,818.48 347,409.41 603,687.77 347,817.24 604,396.45 348,323.09 605,275.45
11 Bore Pile Machine Dia 60 Unit/Jam 227,232 687,000 227,847.08 688,858.78 228,161.18 689,808.44 228,167.54 689,827.64 227,866.18 688,916.55 227,540.70 687,932.49 227,491.44 687,783.57 227,758.50 688,590.98 228,089.74 689,592.43
12 Bore Pile Machine Dia 80 Unit/Jam 898,360 898,360 900,790.77 900,790.77 902,032.59 902,032.59 902,057.70 902,057.70 900,866.31 900,866.31 899,579.50 899,579.50 899,384.76 899,384.76 900,440.58 900,440.58 901,750.12 901,750.12
13 Bulldozer 100-150 HP Unit/Jam 352,298 511,000 353,251.28 512,382.59 353,738.27 513,088.95 353,748.12 513,103.24 353,280.91 512,425.56 352,776.27 511,693.60 352,699.91 511,582.83 353,113.95 512,183.39 353,627.50 512,928.28
14 Cement Tanker Unit/Jam 327,637 423,000 328,523.69 424,144.49 328,976.59 424,729.21 328,985.75 424,741.04 328,551.24 424,180.06 328,081.94 423,574.16 328,010.91 423,482.46 328,395.97 423,979.60 328,873.57 424,596.21
15 Cold Milling Unit/Jam 511,713 1,089,000 513,097.49 1,091,946.46 513,804.84 1,093,451.80 513,819.14 1,093,482.24 513,140.52 1,092,038.03 512,407.54 1,090,478.14 512,296.62 1,090,242.08 512,898.01 1,091,521.95 513,643.94 1,093,109.39
16 Cold Recycler Unit/Jam 4,309,486 4,309,486 4,321,146.31 4,321,146.31 4,327,103.39 4,327,103.39 4,327,223.85 4,327,223.85 4,321,508.68 4,321,508.68 4,315,335.78 4,315,335.78 4,314,401.62 4,314,401.62 4,319,466.41 4,319,466.41 4,325,748.38 4,325,748.38
17 Compressor 4000-6500 L\M Unit/Jam 131,231 131,231 131,586.10 131,586.10 131,767.51 131,767.51 131,771.17 131,771.17 131,597.14 131,597.14 131,409.16 131,409.16 131,380.72 131,380.72 131,534.95 131,534.95 131,726.24 131,726.24
18 Concrete Breaker Unit/Jam 478,245 912,000 479,538.62 914,467.56 480,199.70 915,728.23 480,213.07 915,753.72 479,578.83 914,544.24 478,893.79 913,237.89 478,790.12 913,040.20 479,352.19 914,112.05 480,049.33 915,441.48
19 Concrete Mixer (350) Unit/Jam 88,955 88,955 89,195.95 89,195.95 89,318.91 89,318.91 89,321.40 89,321.40 89,203.43 89,203.43 89,076.01 89,076.01 89,056.73 89,056.73 89,161.27 89,161.27 89,290.94 89,290.94
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 101,286 101,286 101,559.74 101,559.74 101,699.75 101,699.75 101,702.58 101,702.58 101,568.26 101,568.26 101,423.18 101,423.18 101,401.22 101,401.22 101,520.26 101,520.26 101,667.91 101,667.91
21 Concrete Pan Mixer Unit/Jam 269,508 577,000 270,237.23 578,561.16 270,609.78 579,358.76 270,617.31 579,374.89 270,259.89 578,609.68 269,873.85 577,783.19 269,815.43 577,658.11 270,132.17 578,336.24 270,525.04 579,177.34
22 Concrete Pump Unit/Jam 205,214 220,000 205,768.87 220,595.24 206,052.54 220,899.35 206,058.28 220,905.50 205,786.13 220,613.74 205,492.18 220,298.61 205,447.70 220,250.93 205,688.88 220,509.48 205,988.02 220,830.18
23 Concrete Vibrator Unit/Jam 76,625 76,625 76,832.15 76,832.15 76,938.07 76,938.07 76,940.22 76,940.22 76,838.60 76,838.60 76,728.84 76,728.84 76,712.23 76,712.23 76,802.28 76,802.28 76,913.98 76,913.98
24 Crane 10-15 Ton Unit/Jam 274,793 274,793 275,536.00 275,536.00 275,915.85 275,915.85 275,923.53 275,923.53 275,559.11 275,559.11 275,165.49 275,165.49 275,105.93 275,105.93 275,428.88 275,428.88 275,829.45 275,829.45
25 Crane On Track 35 Ton Unit/Jam 228,113 433,000 228,730.21 434,171.55 229,045.53 434,770.09 229,051.91 434,782.19 228,749.39 434,207.96 228,422.64 433,587.73 228,373.19 433,493.87 228,641.28 434,002.76 228,973.81 434,633.95
26 Crane On Track 75-100 Ton Unit/Jam 358,463 543,000 359,433.18 544,469.17 359,928.69 545,219.77 359,938.71 545,234.95 359,463.32 544,514.83 358,949.86 543,737.04 358,872.16 543,619.33 359,293.45 544,257.50 359,815.98 545,049.04
27 Dump Truck 10 Ton Unit/Jam 339,087 339,087 340,004.36 340,004.36 340,473.09 340,473.09 340,482.56 340,482.56 340,032.87 340,032.87 339,547.16 339,547.16 339,473.66 339,473.66 339,872.18 339,872.18 340,366.47 340,366.47
28 Dump Truck 3-4 M3 Unit/Jam 184,956 242,000 185,456.92 242,654.77 185,712.59 242,989.29 185,717.76 242,996.05 185,472.48 242,675.12 185,207.54 242,328.48 185,167.45 242,276.02 185,384.82 242,560.43 185,654.44 242,913.20
29 Excavator 80-140 HP Unit/Jam 267,747 425,000 268,470.97 426,149.90 268,841.09 426,737.39 268,848.57 426,749.27 268,493.49 426,185.64 268,109.97 425,576.87 268,051.93 425,484.74 268,366.60 425,984.23 268,756.90 426,603.76
30 Flat Bed Truck 3-4 M3 Unit/Jam 324,995 434,000 325,874.31 435,174.25 326,323.55 435,774.18 326,332.64 435,786.31 325,901.64 435,210.75 325,436.11 434,589.09 325,365.66 434,495.01 325,747.62 435,005.07 326,221.37 435,637.72
31 Fulvi Mixer Unit/Jam 813,809 1,271,000 816,010.46 1,274,438.89 817,135.40 1,276,195.81 817,158.15 1,276,231.34 816,078.89 1,274,545.76 814,913.19 1,272,725.18 814,736.79 1,272,449.67 815,693.23 1,273,943.43 816,879.52 1,275,796.18
32 Generator Set Unit/Jam 361,986 384,000 362,965.69 385,038.97 363,466.07 385,569.78 363,476.19 385,580.51 362,996.13 385,071.26 362,477.62 384,521.22 362,399.15 384,437.98 362,824.59 384,889.28 363,352.26 385,449.04
33 Hot Recycler Unit/Jam 2,658,970 7,797,000 2,666,164.05 7,818,095.98 2,669,839.60 7,828,873.92 2,669,913.92 7,829,091.85 2,666,387.63 7,818,751.59 2,662,578.93 7,807,583.19 2,662,002.55 7,805,893.04 2,665,127.55 7,815,056.60 2,669,003.55 7,826,422.35
34 Jack Hammer Unit/Jam 50,202 50,202 50,338.31 50,338.31 50,407.70 50,407.70 50,409.11 50,409.11 50,342.53 50,342.53 50,270.62 50,270.62 50,259.74 50,259.74 50,318.74 50,318.74 50,391.92 50,391.92
35 Launching Gantry Unit/Jam 63,888,377 63,888,377 64,061,236.91 64,061,236.91 64,149,550.99 64,149,550.99 64,151,336.76 64,151,336.76 64,066,608.99 64,066,608.99 63,975,095.41 63,975,095.41 63,961,246.43 63,961,246.43 64,036,332.33 64,036,332.33 64,129,462.92 64,129,462.92
36 Motor Grader > 100 HP Unit/Jam 251,012 261,000 251,691.54 261,706.18 252,038.52 262,066.96 252,045.53 262,074.26 251,712.65 261,728.12 251,353.10 261,354.27 251,298.68 261,297.69 251,593.69 261,604.43 251,959.59 261,984.90
37 Pedestrian Roller Unit/Jam 82,790 82,790 83,014.05 83,014.05 83,128.49 83,128.49 83,130.81 83,130.81 83,021.01 83,021.01 82,902.42 82,902.42 82,884.48 82,884.48 82,981.78 82,981.78 83,102.46 83,102.46
38 Pile Driver + Hammer Unit/Jam 94,240 276,000 94,494.72 276,746.76 94,624.99 277,128.28 94,627.62 277,135.99 94,502.64 276,769.97 94,367.65 276,374.63 94,347.23 276,314.80 94,457.98 276,639.17 94,595.36 277,041.50
39 Rock Drill Breaker Unit/Jam 91,598 298,000 91,845.33 298,806.28 91,971.95 299,218.22 91,974.51 299,226.55 91,853.04 298,831.34 91,721.83 298,404.49 91,701.98 298,339.89 91,809.63 298,690.12 91,943.15 299,124.52
40 Split Form Paver Unit/Jam 193,764 193,764 194,288.21 194,288.21 194,556.05 194,556.05 194,561.46 194,561.46 194,304.50 194,304.50 194,026.95 194,026.95 193,984.95 193,984.95 194,212.67 194,212.67 194,495.12 194,495.12
41 Stone Crusher Unit/Jam 518,759 646,000 520,162.51 647,747.85 520,879.60 648,640.83 520,894.10 648,658.89 520,206.13 647,802.17 519,463.06 646,876.84 519,350.61 646,736.81 519,960.29 647,496.03 520,716.49 648,437.71
42 Tamper Unit/Jam 77,506 77,506 77,715.28 77,715.28 77,822.42 77,822.42 77,824.59 77,824.59 77,721.80 77,721.80 77,610.78 77,610.78 77,593.98 77,593.98 77,685.07 77,685.07 77,798.05 77,798.05
43 Tandem Roller 6-8 T Unit/Jam 374,317 437,000 375,329.49 438,182.37 375,846.91 438,786.44 375,857.37 438,798.66 375,360.96 438,219.12 374,824.79 437,593.16 374,743.65 437,498.43 375,183.57 438,012.02 375,729.22 438,649.04
44 Three Wheel Roller 6-8 T Unit/Jam 124,185 157,000 124,521.08 157,424.79 124,692.74 157,641.81 124,696.21 157,646.20 124,531.52 157,437.99 124,353.64 157,213.10 124,326.72 157,179.07 124,472.67 157,363.59 124,653.69 157,592.45
45 Tire Roller 8-10 T Unit/Jam 221,948 401,000 222,548.31 402,084.97 222,855.11 402,639.28 222,861.31 402,650.49 222,566.97 402,118.69 222,249.05 401,544.29 222,200.94 401,457.37 222,461.79 401,928.65 222,785.32 402,513.19
46 Track Loader 75-100 HP Unit/Jam 207,856 274,000 208,418.26 274,741.35 208,705.58 275,120.10 208,711.39 275,127.76 208,435.73 274,764.39 208,138.00 274,371.91 208,092.95 274,312.52 208,337.23 274,634.54 208,640.22 275,033.95
47 Trailer 20 Ton Unit/Jam 335,564 464,000 336,471.85 465,255.42 336,935.70 465,896.82 336,945.08 465,909.79 336,500.06 465,294.44 336,019.40 464,629.81 335,946.66 464,529.23 336,341.04 465,074.55 336,830.19 465,750.93
48 Trailler 15 Ton Unit/Jam 290,646 442,000 291,432.31 443,195.90 291,834.07 443,806.88 291,842.20 443,819.24 291,456.75 443,233.06 291,040.43 442,599.94 290,977.42 442,504.13 291,319.01 443,023.60 291,742.69 443,667.91
49 Truck Mixer (agitator) Unit/Jam 365,509 537,000 366,498.21 538,452.94 367,003.46 539,195.24 367,013.67 539,210.25 366,528.94 538,498.09 366,005.38 537,728.89 365,926.15 537,612.49 366,355.72 538,243.61 366,888.53 539,026.39
50 Vibrating Rammer Unit/Jam 74,863 74,863 75,065.90 75,065.90 75,169.38 75,169.38 75,171.47 75,171.47 75,072.19 75,072.19 74,964.96 74,964.96 74,948.73 74,948.73 75,036.71 75,036.71 75,145.84 75,145.84
51 Vibratory Roller 5-8 T Unit/Jam 180,553 388,000 181,041.28 389,049.79 181,290.86 389,586.13 181,295.91 389,596.98 181,056.46 389,082.42 180,797.84 388,526.65 180,758.70 388,442.54 180,970.90 388,898.55 181,234.09 389,464.14
52 Water Pump 70-100 MM Unit/Jam 56,368 56,368 56,520.21 56,520.21 56,598.12 56,598.12 56,599.70 56,599.70 56,524.94 56,524.94 56,444.20 56,444.20 56,431.99 56,431.99 56,498.23 56,498.23 56,580.40 56,580.40
53 Water Tanker 3000-4500 L Unit/Jam 204,333 204,333 204,885.74 204,885.74 205,168.20 205,168.20 205,173.91 205,173.91 204,902.93 204,902.93 204,610.24 204,610.24 204,565.95 204,565.95 204,806.09 204,806.09 205,103.95 205,103.95
54 Welding Set Unit/Jam 114,497 114,497 114,806.67 114,806.67 114,964.94 114,964.94 114,968.14 114,968.14 114,816.29 114,816.29 114,652.29 114,652.29 114,627.47 114,627.47 114,762.03 114,762.03 114,928.94 114,928.94
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 199,048 317,000 199,586.97 317,857.69 199,862.12 318,295.89 199,867.69 318,304.75 199,603.71 317,884.35 199,318.59 317,430.28 199,275.45 317,361.56 199,509.38 317,734.12 199,799.54 318,196.21
HARGA SATUAN DASAR BAHAN KABUPATEN LUMAJANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 277,000 277,000 277,749.47 277,749.47 278,132.37 278,132.37 278,140.11 278,140.11 277,772.76 277,772.76 277,375.98 277,375.98 277,315.94 277,315.94 277,641.49 277,641.49 278,045.27 278,045.27
2 Agregat Pecah Mesin 20-30 mm M3 264,000 264,000 264,714.29 264,714.29 265,079.22 265,079.22 265,086.60 265,086.60 264,736.49 264,736.49 264,358.34 264,358.34 264,301.11 264,301.11 264,611.38 264,611.38 264,996.22 264,996.22
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 303,000 303,000 303,819.81 303,819.81 304,238.66 304,238.66 304,247.12 304,247.12 303,845.29 303,845.29 303,411.27 303,411.27 303,345.59 303,345.59 303,701.70 303,701.70 304,143.38 304,143.38
4 Bahan Agr. Base Kelas A M3 291,000 291,000 291,787.35 291,787.35 292,189.60 292,189.60 292,197.73 292,197.73 291,811.81 291,811.81 291,394.99 291,394.99 291,331.91 291,331.91 291,673.91 291,673.91 292,098.10 292,098.10
5 Bahan Agr. Base Kelas B M3 273,000 273,000 273,738.64 273,738.64 274,116.02 274,116.02 274,123.65 274,123.65 273,761.60 273,761.60 273,370.55 273,370.55 273,311.38 273,311.38 273,632.22 273,632.22 274,030.18 274,030.18
6 Bahan Agr. Base Kelas C M3 251,000 251,000 251,679.12 251,679.12 252,026.08 252,026.08 252,033.10 252,033.10 251,700.22 251,700.22 251,340.69 251,340.69 251,286.28 251,286.28 251,581.28 251,581.28 251,947.16 251,947.16
7 Bahan Agr. Base Kelas C2 M3 229,000 229,000 229,619.59 229,619.59 229,936.15 229,936.15 229,942.55 229,942.55 229,638.85 229,638.85 229,310.83 229,310.83 229,261.19 229,261.19 229,530.33 229,530.33 229,864.14 229,864.14
8 Bahan Agr. Base Kelas S M3 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
9 Bahan Pilihan M3 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
10 Bahan Tanah Timbunan M3 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
11 Batu Belah/Kerakal M3 299,000 299,000 299,808.99 299,808.99 300,222.30 300,222.30 300,230.66 300,230.66 299,834.13 299,834.13 299,405.84 299,405.84 299,341.03 299,341.03 299,692.44 299,692.44 300,128.29 300,128.29
12 Batu Kali M3 329,000 329,000 329,890.16 329,890.16 330,344.94 330,344.94 330,354.14 330,354.14 329,917.82 329,917.82 329,446.57 329,446.57 329,375.25 329,375.25 329,761.91 329,761.91 330,241.50 330,241.50
13 Chipping M3 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
14 Chipping (kg) Kg 230 230 230.62 230.62 230.94 230.94 230.95 230.95 230.64 230.64 230.31 230.31 230.26 230.26 230.53 230.53 230.87 230.87
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 351,000 351,000 351,949.68 351,949.68 352,434.88 352,434.88 352,444.69 352,444.69 351,979.20 351,979.20 351,476.43 351,476.43 351,400.34 351,400.34 351,812.86 351,812.86 352,324.52 352,324.52
18 Kapur M3 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
19 Pasir Beton (Kasar) M3 418,000 418,000 419,130.96 419,130.96 419,708.77 419,708.77 419,720.46 419,720.46 419,166.11 419,166.11 418,567.37 418,567.37 418,476.76 418,476.76 418,968.02 418,968.02 419,577.34 419,577.34
20 Pasir Halus (untuk HRS) M3 264,000 264,000 264,714.29 264,714.29 265,079.22 265,079.22 265,086.60 265,086.60 264,736.49 264,736.49 264,358.34 264,358.34 264,301.11 264,301.11 264,611.38 264,611.38 264,996.22 264,996.22
21 Pasir Pasang (Sedang) M3 296,000 296,000 296,800.87 296,800.87 297,210.04 297,210.04 297,218.31 297,218.31 296,825.76 296,825.76 296,401.77 296,401.77 296,337.61 296,337.61 296,685.49 296,685.49 297,116.97 297,116.97
22 Pasir Urug M3 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
23 Pasir Urug (ada unsur lempung) M3 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
24 Sirtu M3 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
26 Anti Pengelupas Liter 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
27 Arbocell Kg 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 519,640 519,640 521,045.64 521,045.64 521,763.95 521,763.95 521,778.47 521,778.47 521,089.34 521,089.34 520,345.00 520,345.00 520,232.36 520,232.36 520,843.08 520,843.08 521,600.56 521,600.56
41 Beton K-125 (fc' 10 MPa) M3 537,255 537,255 538,708.21 538,708.21 539,450.86 539,450.86 539,465.88 539,465.88 538,753.38 538,753.38 537,983.82 537,983.82 537,867.36 537,867.36 538,498.78 538,498.78 539,281.94 539,281.94
42 Beton K-175 (fc' 15 MPa) M3 581,292 581,292 582,864.62 582,864.62 583,668.15 583,668.15 583,684.39 583,684.39 582,913.49 582,913.49 582,080.85 582,080.85 581,954.85 581,954.85 582,638.02 582,638.02 583,485.37 583,485.37
43 Beton K-250 (fc' 20 MPa) M3 647,348 647,348 649,099.23 649,099.23 649,994.07 649,994.07 650,012.17 650,012.17 649,153.66 649,153.66 648,226.40 648,226.40 648,086.08 648,086.08 648,846.89 648,846.89 649,790.53 649,790.53
44 Beton K-300 (fc' 25 MPa) M3 673,770 673,770 675,593.08 675,593.08 676,524.44 676,524.44 676,543.27 676,543.27 675,649.73 675,649.73 674,684.62 674,684.62 674,538.57 674,538.57 675,330.43 675,330.43 676,312.59 676,312.59
45 Beton K-350 (fc' 30 MPa) M3 700,192 700,192 702,086.92 702,086.92 703,054.81 703,054.81 703,074.38 703,074.38 702,145.80 702,145.80 701,142.85 701,142.85 700,991.07 700,991.07 701,813.98 701,813.98 702,834.65 702,834.65
46 Beton K-400 (fc' 35 MPa) M3 726,615 726,615 728,580.77 728,580.77 729,585.18 729,585.18 729,605.49 729,605.49 728,641.87 728,641.87 727,601.07 727,601.07 727,443.56 727,443.56 728,297.53 728,297.53 729,356.72 729,356.72
47 Beton K-450 (fc' 40 MPa) M3 761,845 761,845 763,905.90 763,905.90 764,959.01 764,959.01 764,980.30 764,980.30 763,969.96 763,969.96 762,878.69 762,878.69 762,713.55 762,713.55 763,608.92 763,608.92 764,719.47 764,719.47
48 Beton K-500 (fc' 45 MPa) M3 792,671 792,671 794,815.39 794,815.39 795,911.11 795,911.11 795,933.26 795,933.26 794,882.04 794,882.04 793,746.62 793,746.62 793,574.79 793,574.79 794,506.39 794,506.39 795,661.87 795,661.87
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
51 Cat Anti Karat Kg 64,000 64,000 64,173.16 64,173.16 64,261.63 64,261.63 64,263.42 64,263.42 64,178.54 64,178.54 64,086.87 64,086.87 64,073.00 64,073.00 64,148.21 64,148.21 64,241.51 64,241.51
52 Cat Marka (Non Thermoplas) Kg 64,000 64,000 64,173.16 64,173.16 64,261.63 64,261.63 64,263.42 64,263.42 64,178.54 64,178.54 64,086.87 64,086.87 64,073.00 64,073.00 64,148.21 64,148.21 64,241.51 64,241.51
53 Cat Marka (Thermoplastic) Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
54 Cerucuk Diameter 10-15 cm M' 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,149,000 1,149,000 1,152,108.80 1,152,108.80 1,153,697.08 1,153,697.08 1,153,729.20 1,153,729.20 1,152,205.41 1,152,205.41 1,150,559.58 1,150,559.58 1,150,310.52 1,150,310.52 1,151,660.90 1,151,660.90 1,153,335.81 1,153,335.81
57 Curing Compound Liter 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 537,000 537,000 538,452.94 538,452.94 539,195.24 539,195.24 539,210.25 539,210.25 538,498.09 538,498.09 537,728.89 537,728.89 537,612.49 537,612.49 538,243.61 538,243.61 539,026.39 539,026.39
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 625,000 625,000 626,691.03 626,691.03 627,554.98 627,554.98 627,572.45 627,572.45 626,743.59 626,743.59 625,848.34 625,848.34 625,712.86 625,712.86 626,447.40 626,447.40 627,358.47 627,358.47
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 793,000 793,000 795,145.58 795,145.58 796,241.76 796,241.76 796,263.93 796,263.93 795,212.26 795,212.26 794,076.37 794,076.37 793,904.47 793,904.47 794,836.46 794,836.46 795,992.42 795,992.42
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
64 Oxygen (Isi 6 M3) Botol 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
65 Polytene 125 Mikron Kg 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
66 Sand Sheet Ton 1,215,000 1,215,000 1,218,287.37 1,218,287.37 1,219,966.89 1,219,966.89 1,220,000.85 1,220,000.85 1,218,389.53 1,218,389.53 1,216,649.17 1,216,649.17 1,216,385.80 1,216,385.80 1,217,813.74 1,217,813.74 1,219,584.86 1,219,584.86
67 Seal Coat M2 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
68 Seal Guard Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
69 Semen/PC (50 kg) Zak 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
77 Baja Tulangan (Polos) U25 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,450,000 11,450,000 11,480,979.73 11,480,979.73 11,496,807.28 11,496,807.28 11,497,127.32 11,497,127.32 11,481,942.51 11,481,942.51 11,465,541.55 11,465,541.55 11,463,059.55 11,463,059.55 11,476,516.36 11,476,516.36 11,493,207.12 11,493,207.12
87 Box Culvert Type DUB 200×200 M' 12,154,000 12,154,000 12,186,884.51 12,186,884.51 12,203,685.21 12,203,685.21 12,204,024.93 12,204,024.93 12,187,906.48 12,187,906.48 12,170,497.12 12,170,497.12 12,167,862.52 12,167,862.52 12,182,146.71 12,182,146.71 12,199,863.69 12,199,863.69
88 Box Culvert Type uk 300×200 M' 13,123,000 13,123,000 13,158,506.29 13,158,506.29 13,176,646.45 13,176,646.45 13,177,013.26 13,177,013.26 13,159,609.74 13,159,609.74 13,140,812.38 13,140,812.38 13,137,967.73 13,137,967.73 13,153,390.76 13,153,390.76 13,172,520.26 13,172,520.26
89 Casing M2 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
90 Ducting (Kabel Prestress) M' 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
91 Ducting (Strand Prestress) M' 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 1,917,000 1,917,000 1,922,186.74 1,922,186.74 1,924,836.64 1,924,836.64 1,924,890.22 1,924,890.22 1,922,347.93 1,922,347.93 1,919,602.02 1,919,602.02 1,919,186.48 1,919,186.48 1,921,439.46 1,921,439.46 1,924,233.89 1,924,233.89
94 Expansion Join Tipe Rubber M' 1,387,000 1,387,000 1,390,752.74 1,390,752.74 1,392,670.02 1,392,670.02 1,392,708.79 1,392,708.79 1,390,869.37 1,390,869.37 1,388,882.63 1,388,882.63 1,388,581.97 1,388,581.97 1,390,212.07 1,390,212.07 1,392,233.91 1,392,233.91
95 Expansion Join Tipe Torma M' 1,592,000 1,592,000 1,596,307.40 1,596,307.40 1,598,508.05 1,598,508.05 1,598,552.55 1,598,552.55 1,596,441.26 1,596,441.26 1,594,160.89 1,594,160.89 1,593,815.79 1,593,815.79 1,595,686.82 1,595,686.82 1,598,007.49 1,598,007.49
96 Expansion Tipe Joint Asphaltic Plug M' 1,888,000 1,888,000 1,893,108.27 1,893,108.27 1,895,718.09 1,895,718.09 1,895,770.86 1,895,770.86 1,893,267.03 1,893,267.03 1,890,562.66 1,890,562.66 1,890,153.40 1,890,153.40 1,892,372.30 1,892,372.30 1,895,124.46 1,895,124.46
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
99 Glass Bead Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
100 Joint Sealent Kg 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
101 Joint Socket Pile 16×16×16 Set 80,000 80,000 80,216.45 80,216.45 80,327.04 80,327.04 80,329.27 80,329.27 80,223.18 80,223.18 80,108.59 80,108.59 80,091.25 80,091.25 80,185.27 80,185.27 80,301.88 80,301.88
102 Joint Socket Pile 35×35 Set 689,000 689,000 690,864.20 690,864.20 691,816.61 691,816.61 691,835.87 691,835.87 690,922.13 690,922.13 689,935.21 689,935.21 689,785.85 689,785.85 690,595.61 690,595.61 691,599.97 691,599.97
103 Kawat Beton Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
104 Kawat Bronjong Kg 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
105 Kawat Las Dos 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
106 Kayu Acuan (Kelas III/Meranti) M3 3,787,000 3,787,000 3,797,246.31 3,797,246.31 3,802,481.15 3,802,481.15 3,802,587.00 3,802,587.00 3,797,564.74 3,797,564.74 3,792,140.25 3,792,140.25 3,791,319.35 3,791,319.35 3,795,770.08 3,795,770.08 3,801,290.42 3,801,290.42
107 Kayu Perancah (Gelam) M3 2,440,000 2,440,000 2,446,601.79 2,446,601.79 2,449,974.65 2,449,974.65 2,450,042.85 2,450,042.85 2,446,806.96 2,446,806.96 2,443,311.91 2,443,311.91 2,442,783.00 2,442,783.00 2,445,650.65 2,445,650.65 2,449,207.46 2,449,207.46
108 Kerb Pracetak Type 1 (Peninggi) Buah 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
110 Marmer Nama Jembatan Buah 528,000 528,000 529,428.58 529,428.58 530,158.45 530,158.45 530,173.21 530,173.21 529,472.98 529,472.98 528,716.68 528,716.68 528,602.22 528,602.22 529,222.76 529,222.76 529,992.43 529,992.43
111 Mata Kucing Buah 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
112 Matras Concrete (Tebal=10 cm) M2 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
113 Mini Pile 16×16×16 M' 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
114 Mini Timber Pile Buah 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
115 Multipleks 12 mm Lbr 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
116 Paku Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
117 Paving Block (Model Bata 8 cm) M2 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 58,550,000 58,550,000 58,708,416.00 58,708,416.00 58,789,350.75 58,789,350.75 58,790,987.30 58,790,987.30 58,713,339.20 58,713,339.20 58,629,472.30 58,629,472.30 58,616,780.52 58,616,780.52 58,685,592.40 58,685,592.40 58,770,941.19 58,770,941.19
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 82,947,000 82,947,000 83,171,425.82 83,171,425.82 83,286,084.99 83,286,084.99 83,288,403.47 83,288,403.47 83,178,400.46 83,178,400.46 83,059,587.34 83,059,587.34 83,041,607.06 83,041,607.06 83,139,091.93 83,139,091.93 83,260,004.42 83,260,004.42
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 158,534,000 158,534,000 158,962,938.04 158,962,938.04 159,182,082.51 159,182,082.51 159,186,513.75 159,186,513.75 158,976,268.44 158,976,268.44 158,749,184.65 158,749,184.65 158,714,819.51 158,714,819.51 158,901,139.29 158,901,139.29 159,132,235.53 159,132,235.53
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 207,893,000 207,893,000 208,455,486.38 208,455,486.38 208,742,860.71 208,742,860.71 208,748,671.59 208,748,671.59 208,472,967.15 208,472,967.15 208,175,181.63 208,175,181.63 208,130,117.02 208,130,117.02 208,374,446.81 208,374,446.81 208,677,494.05 208,677,494.05
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 265,008,000 265,008,000 265,725,019.77 265,725,019.77 266,091,345.22 266,091,345.22 266,098,752.54 266,098,752.54 265,747,303.08 265,747,303.08 265,367,706.15 265,367,706.15 265,310,260.82 265,310,260.82 265,621,715.98 265,621,715.98 266,008,020.19 266,008,020.19
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 319,732,000 319,732,000 320,597,083.94 320,597,083.94 321,039,055.38 321,039,055.38 321,047,992.31 321,047,992.31 320,623,968.74 320,623,968.74 320,165,985.26 320,165,985.26 320,096,677.50 320,096,677.50 320,472,447.97 320,472,447.97 320,938,523.79 320,938,523.79
124 Pelat Rambu (Eng. Grade) Buah 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
125 Pelat Rambu (High L Grade) Buah 216,000 216,000 216,584.42 216,584.42 216,883.00 216,883.00 216,889.04 216,889.04 216,602.58 216,602.58 216,293.19 216,293.19 216,246.36 216,246.36 216,500.22 216,500.22 216,815.09 216,815.09
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
128 Pipa Drainase Baja Dia 3" M' 242,000 242,000 242,654.77 242,654.77 242,989.29 242,989.29 242,996.05 242,996.05 242,675.12 242,675.12 242,328.48 242,328.48 242,276.02 242,276.02 242,560.43 242,560.43 242,913.20 242,913.20
129 Pipa Galvanis Dia 1,5" M' 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
130 Pipa Galvanis Dia 2" M' 277,000 277,000 277,749.47 277,749.47 278,132.37 278,132.37 278,140.11 278,140.11 277,772.76 277,772.76 277,375.98 277,375.98 277,315.94 277,315.94 277,641.49 277,641.49 278,045.27 278,045.27
131 Pipa Galvanis Dia 3" M' 212,000 212,000 212,573.60 212,573.60 212,866.65 212,866.65 212,872.58 212,872.58 212,591.42 212,591.42 212,287.76 212,287.76 212,241.80 212,241.80 212,490.96 212,490.96 212,799.99 212,799.99
132 Pipa Porus M' 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
133 Pipa PVC Dia 4" M' 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
134 Plastik Filter M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
135 Rel Pengaman M' 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,809,000 1,809,000 1,813,894.53 1,813,894.53 1,816,395.14 1,816,395.14 1,816,445.70 1,816,445.70 1,814,046.64 1,814,046.64 1,811,455.43 1,811,455.43 1,811,063.30 1,811,063.30 1,813,189.35 1,813,189.35 1,815,826.35 1,815,826.35
137 Strip Bearing Buah 277,000 277,000 277,749.47 277,749.47 278,132.37 278,132.37 278,140.11 278,140.11 277,772.76 277,772.76 277,375.98 277,375.98 277,315.94 277,315.94 277,641.49 277,641.49 278,045.27 278,045.27
138 Tiang Pancang Baja Diameter 400 M' 641,000 641,000 642,734.32 642,734.32 643,620.39 643,620.39 643,638.31 643,638.31 642,788.22 642,788.22 641,870.06 641,870.06 641,731.11 641,731.11 642,484.45 642,484.45 643,418.84 643,418.84
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 783,000 783,000 785,118.53 785,118.53 786,200.88 786,200.88 786,222.77 786,222.77 785,184.37 785,184.37 784,062.80 784,062.80 783,893.07 783,893.07 784,813.30 784,813.30 785,954.69 785,954.69
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,638,000 1,638,000 1,642,431.86 1,642,431.86 1,644,696.10 1,644,696.10 1,644,741.88 1,644,741.88 1,642,569.59 1,642,569.59 1,640,223.32 1,640,223.32 1,639,868.26 1,639,868.26 1,641,793.34 1,641,793.34 1,644,181.07 1,644,181.07
HARGA SATUAN DASAR UPAH KABUPATEN LUMAJANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 106,274.35
2 Tukang OH 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 119,307.99
3 Mandor OH 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 137,354.58
4 Operator OH 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 282,729.87
5 Pembantu Operator OH 176,733.07 176,733.07 176,554.45 176,554.45 176,297.62 176,297.62 176,200.72 176,200.72 176,349.96 176,349.96 176,603.12 176,603.12 176,724.93 176,724.93 176,455.52 176,455.52
6 Sopir OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64
7 Pembantu Sopir OH 114,474.83 114,474.83 114,359.13 114,359.13 114,192.78 114,192.78 114,130.01 114,130.01 114,226.68 114,226.68 114,390.66 114,390.66 114,469.56 114,469.56 114,295.05 114,295.05
8 Mekanik OH 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 159,411.52
9 Pembantu Mekanik OH 114,474.83 114,474.83 114,359.13 114,359.13 114,192.78 114,192.78 114,130.01 114,130.01 114,226.68 114,226.68 114,390.66 114,390.66 114,469.56 114,469.56 114,295.05 114,295.05
10 Kepala Tukang OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64
11 Pemasak Aspal OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64

HARGA SATUAN DASAR ALAT KABUPATEN LUMAJANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 416,558.83 464,928.46 416,137.83 464,458.58 415,532.49 463,782.94 415,304.09 463,528.03 415,655.86 463,920.65 416,252.54 464,586.61 416,539.65 464,907.06 415,904.65 845,437.29
2 Asphalt Distribution Unit/Jam 256,479.96 330,370.33 256,220.75 330,036.44 255,848.03 329,556.35 255,707.40 329,375.21 255,923.99 329,654.19 256,291.37 330,127.42 256,468.15 330,355.13 256,077.17 564,584.63
3 Asphalt Finisher Unit/Jam 188,380.11 893,706.98 188,189.72 892,803.75 187,915.96 891,505.01 187,812.68 891,015.01 187,971.76 891,769.71 188,241.59 893,049.85 188,371.44 893,665.84 188,084.27 1,064,710.91
4 Asphalt Liquid Mixer Unit/Jam 67,215.44 122,508.15 67,147.51 122,384.33 67,049.83 122,206.31 67,012.97 122,139.14 67,069.74 122,242.59 67,166.01 122,418.07 67,212.34 122,502.51 67,109.88 183,832.02
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 90,210.19 90,210.19 90,119.02 90,119.02 89,987.93 89,987.93 89,938.47 89,938.47 90,014.64 90,014.64 90,143.86 90,143.86 90,206.04 90,206.04 90,068.52 172,629.83
6 Asphalt Mixing Plant Unit/Jam 1,008,231.56 5,171,696.38 1,007,212.58 5,166,469.57 1,005,747.42 5,158,954.03 1,005,194.62 5,156,118.46 1,006,046.03 5,160,485.76 1,007,490.22 5,167,893.71 1,008,185.15 5,171,458.32 1,006,648.20 6,086,318.56
7 Asphalt Sprayer Unit/Jam 83,134.88 83,134.88 83,050.86 83,050.86 82,930.05 82,930.05 82,884.47 82,884.47 82,954.67 82,954.67 83,073.76 83,073.76 83,131.06 83,131.06 83,004.33 159,090.23
8 Asphalt Tanker Unit/Jam 389,142.01 450,870.15 388,748.72 450,414.48 388,183.21 449,759.27 387,969.85 449,512.06 388,298.47 449,892.81 388,855.88 450,538.63 389,124.09 450,849.40 388,530.88 806,308.89
9 Blending Equipment Unit/Jam 126,471.15 199,828.87 126,343.33 199,626.91 126,159.54 199,336.51 126,090.20 199,226.95 126,197.00 199,395.70 126,378.16 199,681.93 126,465.33 199,819.67 126,272.54 315,262.76
10 Bore Pile Machine Unit/Jam 348,458.98 605,511.59 348,106.81 604,899.62 347,600.42 604,019.69 347,409.37 603,687.70 347,703.63 604,199.03 348,202.76 605,066.36 348,442.94 605,483.71 347,911.75 923,473.94
11 Bore Pile Machine Dia 60 Unit/Jam 228,178.72 689,861.46 227,948.11 689,164.24 227,616.52 688,161.73 227,491.41 687,783.49 227,684.10 688,366.05 228,010.95 689,354.21 228,168.22 689,829.70 227,820.38 897,609.61
12 Bore Pile Machine Dia 80 Unit/Jam 902,101.92 902,101.92 901,190.21 901,190.21 899,879.27 899,879.27 899,384.66 899,384.66 900,146.45 900,146.45 901,438.62 901,438.62 902,060.40 902,060.40 900,685.23 1,726,298.27
13 Bulldozer 100-150 HP Unit/Jam 353,765.46 513,128.39 353,407.92 512,609.79 352,893.83 511,864.11 352,699.87 511,582.77 352,998.61 512,016.09 353,505.34 512,751.10 353,749.18 513,104.77 353,209.90 836,092.38
14 Cement Tanker Unit/Jam 329,001.88 424,761.86 328,669.37 424,332.57 328,191.26 423,715.30 328,010.88 423,482.41 328,288.70 423,841.11 328,759.97 424,449.54 328,986.73 424,742.31 328,485.20 725,200.73
15 Cold Milling Unit/Jam 513,844.33 1,093,535.85 513,325.01 1,092,430.66 512,578.29 1,090,841.53 512,296.56 1,090,241.96 512,730.48 1,091,165.41 513,466.51 1,092,731.79 513,820.68 1,093,485.51 513,037.37 1,562,094.19
16 Cold Recycler Unit/Jam 4,327,435.99 4,327,435.99 4,323,062.44 4,323,062.44 4,316,773.78 4,316,773.78 4,314,401.11 4,314,401.11 4,318,055.47 4,318,055.47 4,324,254.09 4,324,254.09 4,327,236.79 4,327,236.79 4,320,640.05 8,281,154.37
17 Compressor 4000-6500 L\M Unit/Jam 131,777.63 131,777.63 131,644.45 131,644.45 131,452.95 131,452.95 131,380.70 131,380.70 131,491.98 131,491.98 131,680.74 131,680.74 131,771.57 131,771.57 131,570.69 252,174.94
18 Concrete Breaker Unit/Jam 480,236.61 915,798.62 479,751.26 914,873.06 479,053.37 913,542.21 478,790.07 913,040.10 479,195.61 913,813.45 479,883.50 915,125.24 480,214.51 915,756.46 479,482.43 1,353,877.95
19 Concrete Mixer (350) Unit/Jam 89,325.78 89,325.78 89,235.50 89,235.50 89,105.69 89,105.69 89,056.72 89,056.72 89,132.15 89,132.15 89,260.10 89,260.10 89,321.67 89,321.67 89,185.50 170,937.38
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 101,707.57 101,707.57 101,604.78 101,604.78 101,456.98 101,456.98 101,401.21 101,401.21 101,487.10 101,487.10 101,632.79 101,632.79 101,702.89 101,702.89 101,547.84 194,631.67
21 Concrete Pan Mixer Unit/Jam 270,630.58 579,403.29 270,357.06 578,817.71 269,963.78 577,975.72 269,815.40 577,658.04 270,043.93 578,147.33 270,431.59 578,977.27 270,618.12 579,376.62 270,205.57 826,177.29
22 Concrete Pump Unit/Jam 206,068.38 220,916.33 205,860.12 220,693.06 205,560.66 220,372.03 205,447.67 220,250.90 205,621.69 220,437.46 205,916.86 220,753.90 206,058.89 220,906.16 205,744.76 409,165.32
23 Concrete Vibrator Unit/Jam 76,943.99 76,943.99 76,866.22 76,866.22 76,754.41 76,754.41 76,712.22 76,712.22 76,777.20 76,777.20 76,887.41 76,887.41 76,940.45 76,940.45 76,823.15 147,243.09
24 Crane 10-15 Ton Unit/Jam 275,937.06 275,937.06 275,658.18 275,658.18 275,257.19 275,257.19 275,105.90 275,105.90 275,338.91 275,338.91 275,734.17 275,734.17 275,924.36 275,924.36 275,503.72 528,044.18
25 Crane On Track 35 Ton Unit/Jam 229,063.14 434,803.51 228,831.63 434,364.07 228,498.76 433,732.21 228,373.16 433,493.82 228,566.60 433,860.99 228,894.71 434,483.81 229,052.59 434,783.50 228,703.41 643,761.64
26 Crane On Track 75-100 Ton Unit/Jam 359,956.36 545,261.68 359,592.56 544,710.60 359,069.47 543,918.23 358,872.11 543,619.27 359,176.08 544,079.72 359,691.69 544,860.75 359,939.79 545,236.58 359,391.07 873,841.17
27 Dump Truck 10 Ton Unit/Jam 340,499.26 340,499.26 340,155.13 340,155.13 339,660.31 339,660.31 339,473.62 339,473.62 339,761.16 339,761.16 340,248.89 340,248.89 340,483.58 340,483.58 339,964.52 651,592.98
28 Dump Truck 3-4 M3 Unit/Jam 185,726.87 243,007.97 185,539.16 242,762.37 185,269.26 242,409.23 185,167.43 242,275.99 185,324.27 242,481.20 185,590.30 242,829.29 185,718.32 242,996.78 185,435.20 412,605.49
29 Excavator 80-140 HP Unit/Jam 268,861.75 426,770.19 268,590.02 426,338.87 268,199.31 425,718.69 268,051.90 425,484.69 268,278.94 425,845.08 268,664.06 426,456.39 268,849.37 426,750.54 268,439.52 672,165.04
30 Flat Bed Truck 3-4 M3 Unit/Jam 326,348.64 435,807.68 326,018.81 435,367.22 325,544.56 434,733.90 325,365.63 434,494.96 325,641.22 434,862.98 326,108.68 435,487.23 326,333.61 435,787.61 325,836.13 733,800.93
31 Fulvi Mixer Unit/Jam 817,198.21 1,276,293.91 816,372.31 1,275,004.01 815,184.75 1,273,149.29 814,736.69 1,272,449.52 815,426.78 1,273,527.30 816,597.34 1,275,355.47 817,160.60 1,276,235.16 815,914.86 2,022,197.86
32 Generator Set Unit/Jam 363,494.01 385,599.42 363,126.64 385,209.71 362,598.41 384,649.35 362,399.11 384,437.94 362,706.07 384,763.56 363,226.74 385,315.89 363,477.28 385,581.67 362,923.17 717,667.35
33 Hot Recycler Unit/Jam 2,670,044.81 7,829,475.68 2,667,346.31 7,821,562.76 2,663,466.19 7,810,184.92 2,662,002.24 7,805,892.14 2,664,256.99 7,812,503.82 2,668,081.57 7,823,718.78 2,669,921.90 7,829,115.27 2,665,851.69 10,260,832.73
34 Jack Hammer Unit/Jam 50,411.58 50,411.58 50,360.63 50,360.63 50,287.37 50,287.37 50,259.73 50,259.73 50,302.30 50,302.30 50,374.51 50,374.51 50,409.26 50,409.26 50,332.41 96,469.61
35 Launching Gantry Unit/Jam 64,154,481.84 64,154,481.84 64,089,643.60 64,089,643.60 63,996,413.94 63,996,413.94 63,961,239.01 63,961,239.01 64,015,414.97 64,015,414.97 64,107,309.98 64,107,309.98 64,151,528.65 64,151,528.65 64,053,731.50 122,768,578.93
36 Motor Grader > 100 HP Unit/Jam 252,057.89 262,087.10 251,803.15 261,822.22 251,436.85 261,441.36 251,298.65 261,297.66 251,511.51 261,518.98 251,872.56 261,894.40 252,046.29 262,075.04 251,662.05 492,361.51
37 Pedestrian Roller Unit/Jam 83,134.88 83,134.88 83,050.86 83,050.86 82,930.05 82,930.05 82,884.47 82,884.47 82,954.67 82,954.67 83,073.76 83,073.76 83,131.06 83,131.06 83,004.33 159,090.23
38 Pile Driver + Hammer Unit/Jam 94,632.26 277,149.58 94,536.62 276,869.48 94,399.10 276,466.72 94,347.21 276,314.77 94,427.13 276,548.81 94,562.68 276,945.80 94,627.90 277,136.82 94,483.65 363,322.76
39 Rock Drill Breaker Unit/Jam 91,979.02 299,241.21 91,886.06 298,938.78 91,752.40 298,503.93 91,701.97 298,339.86 91,779.64 298,592.55 91,911.39 299,021.19 91,974.79 299,227.44 91,834.57 382,951.43
40 Split Form Paver Unit/Jam 194,571.00 194,571.00 194,374.36 194,374.36 194,091.61 194,091.61 193,984.93 193,984.93 194,149.23 194,149.23 194,427.94 194,427.94 194,562.05 194,562.05 194,265.44 372,338.84
41 Stone Crusher Unit/Jam 520,919.64 648,690.69 520,393.17 648,035.08 519,636.17 647,092.40 519,350.55 646,736.73 519,790.45 647,284.53 520,536.62 648,213.71 520,895.66 648,660.83 520,101.57 1,124,423.02
42 Tamper Unit/Jam 77,828.40 77,828.40 77,749.74 77,749.74 77,636.64 77,636.64 77,593.97 77,593.97 77,659.69 77,659.69 77,771.18 77,771.18 77,824.82 77,824.82 77,706.18 148,935.54
43 Tandem Roller 6-8 T Unit/Jam 375,875.80 438,820.17 375,495.92 438,376.67 374,949.69 437,738.98 374,743.61 437,498.38 375,061.02 437,868.95 375,599.43 438,497.51 375,858.50 438,799.97 375,285.51 782,136.47
44 Three Wheel Roller 6-8 T Unit/Jam 124,702.32 157,653.93 124,576.29 157,494.59 124,395.08 157,265.49 124,326.70 157,179.05 124,432.01 157,312.18 124,610.63 157,538.01 124,696.58 157,646.67 124,506.49 271,535.21
45 Tire Roller 8-10 T Unit/Jam 222,872.24 402,670.23 222,646.99 402,263.26 222,323.11 401,678.10 222,200.92 401,457.32 222,389.12 401,797.36 222,708.37 402,374.15 222,861.98 402,651.69 222,522.23 606,012.85
46 Track Loader 75-100 HP Unit/Jam 208,721.62 275,141.25 208,510.68 274,863.18 208,207.36 274,463.34 208,092.92 274,312.49 208,269.18 274,544.83 208,568.15 274,938.94 208,712.01 275,128.59 208,393.84 465,733.35
47 Trailer 20 Ton Unit/Jam 336,961.60 465,932.63 336,621.05 465,461.73 336,131.37 464,784.64 335,946.62 464,529.17 336,231.17 464,922.63 336,713.84 465,590.04 336,946.09 465,911.18 336,432.43 773,591.67
48 Trailler 15 Ton Unit/Jam 291,856.50 443,841.00 291,561.54 443,392.43 291,137.41 442,747.43 290,977.39 442,504.08 291,223.85 442,878.89 291,641.91 443,514.65 291,843.07 443,820.57 291,398.16 710,254.08
49 Truck Mixer (agitator) Unit/Jam 367,031.67 539,236.69 366,660.72 538,691.70 366,127.35 537,908.08 365,926.11 537,612.42 366,236.06 538,067.79 366,761.79 538,840.19 367,014.77 539,211.86 366,455.27 874,301.04
50 Vibrating Rammer Unit/Jam 75,175.16 75,175.16 75,099.18 75,099.18 74,989.94 74,989.94 74,948.72 74,948.72 75,012.20 75,012.20 75,119.89 75,119.89 75,171.70 75,171.70 75,057.10 143,858.19
51 Vibratory Roller 5-8 T Unit/Jam 181,304.80 389,616.08 181,121.56 389,222.31 180,858.09 388,656.12 180,758.68 388,442.50 180,911.79 388,771.51 181,171.49 389,329.60 181,296.45 389,598.14 181,020.07 554,936.25
52 Water Pump 70-100 MM Unit/Jam 56,602.47 56,602.47 56,545.27 56,545.27 56,463.01 56,463.01 56,431.98 56,431.98 56,479.78 56,479.78 56,560.85 56,560.85 56,599.87 56,599.87 56,513.58 108,316.75
53 Water Tanker 3000-4500 L Unit/Jam 205,183.97 205,183.97 204,976.60 204,976.60 204,678.42 204,678.42 204,565.92 204,565.92 204,739.19 204,739.19 205,033.10 205,033.10 205,174.52 205,174.52 204,861.74 392,648.23
54 Welding Set Unit/Jam 114,973.77 114,973.77 114,857.58 114,857.58 114,690.49 114,690.49 114,627.46 114,627.46 114,724.55 114,724.55 114,889.24 114,889.24 114,968.48 114,968.48 114,793.22 220,018.41
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 199,877.49 318,320.35 199,675.48 317,998.64 199,385.01 317,536.05 199,275.42 317,361.52 199,444.21 317,630.33 199,730.52 318,086.30 199,868.28 318,305.70 199,563.59 500,750.40
HARGA SATUAN DASAR BAHAN KABUPATEN LUMAJANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 278,153.75 278,153.75 277,872.63 277,872.63 277,468.41 277,468.41 277,315.91 277,315.91 277,550.80 277,550.80 277,949.22 277,949.22 278,140.94 278,140.94 277,716.92 532,286.12
2 Agregat Pecah Mesin 20-30 mm M3 265,099.60 265,099.60 264,831.67 264,831.67 264,446.43 264,446.43 264,301.08 264,301.08 264,524.95 264,524.95 264,904.68 264,904.68 265,087.40 265,087.40 264,683.28 507,305.18
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 304,262.04 304,262.04 303,954.54 303,954.54 303,512.38 303,512.38 303,345.56 303,345.56 303,602.50 303,602.50 304,038.32 304,038.32 304,248.03 304,248.03 303,784.22 582,247.99
4 Bahan Agr. Base Kelas A M3 292,212.06 292,212.06 291,916.73 291,916.73 291,492.09 291,492.09 291,331.87 291,331.87 291,578.63 291,578.63 291,997.20 291,997.20 292,198.61 292,198.61 291,753.16 559,188.67
5 Bahan Agr. Base Kelas B M3 274,137.09 274,137.09 273,860.03 273,860.03 273,461.65 273,461.65 273,311.34 273,311.34 273,542.84 273,542.84 273,935.52 273,935.52 274,124.47 274,124.47 273,706.57 524,599.68
6 Bahan Agr. Base Kelas C M3 252,045.45 252,045.45 251,790.72 251,790.72 251,424.45 251,424.45 251,286.25 251,286.25 251,499.10 251,499.10 251,860.13 251,860.13 252,033.85 252,033.85 251,649.63 482,324.25
7 Bahan Agr. Base Kelas C2 M3 229,953.82 229,953.82 229,721.41 229,721.41 229,387.24 229,387.24 229,261.16 229,261.16 229,455.35 229,455.35 229,784.74 229,784.74 229,943.23 229,943.23 229,592.69 440,048.81
8 Bahan Agr. Base Kelas S M3 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
9 Bahan Pilihan M3 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 355,497.95
10 Bahan Tanah Timbunan M3 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 203,690.72
11 Batu Belah/Kerakal M3 300,245.38 300,245.38 299,941.93 299,941.93 299,505.62 299,505.62 299,341.00 299,341.00 299,594.54 299,594.54 300,024.61 300,024.61 300,231.56 300,231.56 299,773.86 574,561.55
12 Batu Kali M3 330,370.33 330,370.33 330,036.44 330,036.44 329,556.35 329,556.35 329,375.21 329,375.21 329,654.19 329,654.19 330,127.42 330,127.42 330,355.13 330,355.13 329,851.51 632,209.87
13 Chipping M3 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
14 Chipping (kg) Kg 230.96 230.96 230.72 230.72 230.39 230.39 230.26 230.26 230.46 230.46 230.79 230.79 230.95 230.95 230.60 441.97
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 352,461.97 352,461.97 352,105.75 352,105.75 351,593.55 351,593.55 351,400.30 351,400.30 351,697.94 351,697.94 352,202.81 352,202.81 352,445.74 352,445.74 351,908.45 674,485.30
18 Kapur M3 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
19 Pasir Beton (Kasar) M3 419,741.03 419,741.03 419,316.82 419,316.82 418,706.85 418,706.85 418,476.71 418,476.71 418,831.17 418,831.17 419,432.40 419,432.40 419,721.71 419,721.71 419,081.86 803,233.21
20 Pasir Halus (untuk HRS) M3 265,099.60 265,099.60 264,831.67 264,831.67 264,446.43 264,446.43 264,301.08 264,301.08 264,524.95 264,524.95 264,904.68 264,904.68 265,087.40 265,087.40 264,683.28 507,305.18
21 Pasir Pasang (Sedang) M3 297,232.88 297,232.88 296,932.48 296,932.48 296,500.54 296,500.54 296,337.58 296,337.58 296,588.58 296,588.58 297,014.33 297,014.33 297,219.20 297,219.20 296,766.10 568,796.72
22 Pasir Urug M3 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
23 Pasir Urug (ada unsur lempung) M3 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
24 Sirtu M3 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
26 Anti Pengelupas Liter 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
27 Arbocell Kg 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 240,201.32
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 521,804.05 521,804.05 521,276.69 521,276.69 520,518.40 520,518.40 520,232.30 520,232.30 520,672.95 520,672.95 521,420.38 521,420.38 521,780.03 521,780.03 520,984.60 998,545.08
41 Beton K-125 (fc' 10 MPa) M3 539,492.33 539,492.33 538,947.08 538,947.08 538,163.09 538,163.09 537,867.30 537,867.30 538,322.88 538,322.88 539,095.65 539,095.65 539,467.49 539,467.49 538,645.09 1,032,394.07
42 Beton K-175 (fc' 15 MPa) M3 583,713.01 583,713.01 583,123.08 583,123.08 582,274.82 582,274.82 581,954.78 581,954.78 582,447.70 582,447.70 583,283.81 583,283.81 583,686.14 583,686.14 582,796.33 1,117,016.53
43 Beton K-250 (fc' 20 MPa) M3 650,044.03 650,044.03 649,387.06 649,387.06 648,442.41 648,442.41 648,086.00 648,086.00 648,634.94 648,634.94 649,566.07 649,566.07 650,014.11 650,014.11 649,023.18 1,243,950.23
44 Beton K-300 (fc' 25 MPa) M3 676,576.44 676,576.44 675,892.66 675,892.66 674,909.45 674,909.45 674,538.49 674,538.49 675,109.84 675,109.84 676,078.97 676,078.97 676,545.30 676,545.30 675,513.92 1,294,723.71
45 Beton K-350 (fc' 30 MPa) M3 703,108.85 703,108.85 702,398.25 702,398.25 701,376.49 701,376.49 700,990.98 700,990.98 701,584.73 701,584.73 702,591.87 702,591.87 703,076.49 703,076.49 702,004.67 1,345,497.18
46 Beton K-400 (fc' 35 MPa) M3 729,641.26 729,641.26 728,903.84 728,903.84 727,843.53 727,843.53 727,443.47 727,443.47 728,059.63 728,059.63 729,104.77 729,104.77 729,607.68 729,607.68 728,495.41 1,396,270.66
47 Beton K-450 (fc' 40 MPa) M3 765,017.81 765,017.81 764,244.64 764,244.64 763,132.91 763,132.91 762,713.46 762,713.46 763,359.49 763,359.49 764,455.30 764,455.30 764,982.59 764,982.59 763,816.40 1,463,968.63
48 Beton K-500 (fc' 45 MPa) M3 795,972.29 795,972.29 795,167.83 795,167.83 794,011.12 794,011.12 793,574.70 793,574.70 794,246.87 794,246.87 795,387.02 795,387.02 795,935.65 795,935.65 794,722.26 1,523,204.36
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
51 Cat Anti Karat Kg 64,266.57 64,266.57 64,201.62 64,201.62 64,108.23 64,108.23 64,072.99 64,072.99 64,127.26 64,127.26 64,219.32 64,219.32 64,263.61 64,263.61 64,165.64 122,983.07
52 Cat Marka (Non Thermoplas) Kg 64,266.57 64,266.57 64,201.62 64,201.62 64,108.23 64,108.23 64,072.99 64,072.99 64,127.26 64,127.26 64,219.32 64,219.32 64,263.61 64,263.61 64,165.64 122,983.07
53 Cat Marka (Thermoplastic) Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
54 Cerucuk Diameter 10-15 cm M' 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,153,785.76 1,153,785.76 1,152,619.68 1,152,619.68 1,150,942.99 1,150,942.99 1,150,310.38 1,150,310.38 1,151,284.71 1,151,284.71 1,152,937.40 1,152,937.40 1,153,732.65 1,153,732.65 1,151,973.81 2,207,930.51
57 Curing Compound Liter 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 539,236.69 539,236.69 538,691.70 538,691.70 537,908.08 537,908.08 537,612.42 537,612.42 538,067.79 538,067.79 538,840.19 538,840.19 539,211.86 539,211.86 538,389.85 1,031,904.86
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 627,603.22 627,603.22 626,968.93 626,968.93 626,056.89 626,056.89 625,712.79 625,712.79 626,242.77 626,242.77 627,141.75 627,141.75 627,574.33 627,574.33 626,617.61 1,201,006.59
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 796,302.96 796,302.96 795,498.17 795,498.17 794,340.98 794,340.98 793,904.38 793,904.38 794,576.83 794,576.83 795,717.45 795,717.45 796,266.31 796,266.31 795,052.42 1,523,837.16
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
64 Oxygen (Isi 6 M3) Botol 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
65 Polytene 125 Mikron Kg 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
66 Sand Sheet Ton 1,220,060.66 1,220,060.66 1,218,827.59 1,218,827.59 1,217,054.60 1,217,054.60 1,216,385.65 1,216,385.65 1,217,415.95 1,217,415.95 1,219,163.57 1,219,163.57 1,220,004.50 1,220,004.50 1,218,144.63 2,334,756.81
67 Seal Coat M2 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
68 Seal Guard Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
69 Semen/PC (50 kg) Zak 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
77 Baja Tulangan (Polos) U25 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,497,690.98 11,497,690.98 11,486,070.74 11,486,070.74 11,469,362.23 11,469,362.23 11,463,058.22 11,463,058.22 11,472,767.58 11,472,767.58 11,489,236.89 11,489,236.89 11,497,161.71 11,497,161.71 11,479,634.62 22,002,440.70
87 Box Culvert Type DUB 200×200 M' 12,204,623.24 12,204,623.24 12,192,288.54 12,192,288.54 12,174,552.71 12,174,552.71 12,167,861.10 12,167,861.10 12,178,167.43 12,178,167.43 12,195,649.36 12,195,649.36 12,204,061.43 12,204,061.43 12,185,456.70 23,355,254.52
88 Box Culvert Type uk 300×200 M' 13,177,659.27 13,177,659.27 13,164,341.17 13,164,341.17 13,145,191.32 13,145,191.32 13,137,966.21 13,137,966.21 13,149,094.23 13,149,094.23 13,167,969.93 13,167,969.93 13,177,052.67 13,177,052.67 13,156,964.64 25,217,295.13
89 Casing M2 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
90 Ducting (Kabel Prestress) M' 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
91 Ducting (Strand Prestress) M' 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 1,924,984.59 1,924,984.59 1,923,039.09 1,923,039.09 1,920,241.69 1,920,241.69 1,919,186.25 1,919,186.25 1,920,811.83 1,920,811.83 1,923,569.18 1,923,569.18 1,924,895.98 1,924,895.98 1,921,961.53 3,683,727.41
94 Expansion Join Tipe Rubber M' 1,392,777.06 1,392,777.06 1,391,369.44 1,391,369.44 1,389,345.45 1,389,345.45 1,388,581.81 1,388,581.81 1,389,757.96 1,389,757.96 1,391,752.98 1,391,752.98 1,392,712.95 1,392,712.95 1,390,589.80 2,665,273.82
95 Expansion Join Tipe Torma M' 1,598,630.92 1,598,630.92 1,597,015.25 1,597,015.25 1,594,692.11 1,594,692.11 1,593,815.61 1,593,815.61 1,595,165.59 1,595,165.59 1,597,455.47 1,597,455.47 1,598,557.33 1,598,557.33 1,596,120.38 3,059,203.98
96 Expansion Tipe Joint Asphaltic Plug M' 1,895,863.80 1,895,863.80 1,893,947.73 1,893,947.73 1,891,192.65 1,891,192.65 1,890,153.18 1,890,153.18 1,891,754.16 1,891,754.16 1,894,469.80 1,894,469.80 1,895,776.53 1,895,776.53 1,892,886.48 3,628,000.70
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
99 Glass Bead Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
100 Joint Sealent Kg 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
101 Joint Socket Pile 16×16×16 Set 80,333.21 80,333.21 80,252.02 80,252.02 80,135.28 80,135.28 80,091.24 80,091.24 80,159.07 80,159.07 80,274.14 80,274.14 80,329.51 80,329.51 80,207.05 153,728.84
102 Joint Socket Pile 35×35 Set 691,869.79 691,869.79 691,170.55 691,170.55 690,165.12 690,165.12 689,785.77 689,785.77 690,370.03 690,370.03 691,361.07 691,361.07 691,837.94 691,837.94 690,783.25 1,323,989.66
103 Kawat Beton Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
104 Kawat Bronjong Kg 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
105 Kawat Las Dos 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
106 Kayu Acuan (Kelas III/Meranti) M3 3,802,773.43 3,802,773.43 3,798,930.12 3,798,930.12 3,793,403.91 3,793,403.91 3,791,318.91 3,791,318.91 3,794,530.20 3,794,530.20 3,799,977.30 3,799,977.30 3,802,598.38 3,802,598.38 3,796,801.42 7,277,139.12
107 Kayu Perancah (Gelam) M3 2,450,162.97 2,450,162.97 2,447,686.69 2,447,686.69 2,444,126.10 2,444,126.10 2,442,782.71 2,442,782.71 2,444,851.78 2,444,851.78 2,448,361.40 2,448,361.40 2,450,050.18 2,450,050.18 2,446,315.15 4,688,729.72
108 Kerb Pracetak Type 1 (Peninggi) Buah 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
110 Marmer Nama Jembatan Buah 530,199.20 530,199.20 529,663.35 529,663.35 528,892.86 528,892.86 528,602.16 528,602.16 529,049.89 529,049.89 529,809.35 529,809.35 530,174.79 530,174.79 529,366.56 1,014,610.37
111 Mata Kucing Buah 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
112 Matras Concrete (Tebal=10 cm) M2 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 247,887.76
113 Mini Pile 16×16×16 M' 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 230,593.26
114 Mini Timber Pile Buah 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
115 Multipleks 12 mm Lbr 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 58,793,869.58 58,793,869.58 58,734,449.09 58,734,449.09 58,649,009.50 58,649,009.50 58,616,773.71 58,616,773.71 58,666,422.84 58,666,422.84 58,750,639.30 58,750,639.30 58,791,163.16 58,791,163.16 58,701,537.73 112,510,297.20
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 83,292,486.76 83,292,486.76 83,208,306.55 83,208,306.55 83,087,265.43 83,087,265.43 83,041,597.42 83,041,597.42 83,111,934.68 83,111,934.68 83,231,243.00 83,231,243.00 83,288,652.61 83,288,652.61 83,161,681.47 159,391,829.57
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 159,194,318.02 159,194,318.02 159,033,427.01 159,033,427.01 158,802,084.91 158,802,084.91 158,714,801.09 158,714,801.09 158,849,234.49 158,849,234.49 159,077,264.74 159,077,264.74 159,186,989.92 159,186,989.92 158,944,313.97 304,640,605.56
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 208,758,905.70 208,758,905.70 208,547,921.84 208,547,921.84 208,244,552.20 208,244,552.20 208,130,092.86 208,130,092.86 208,306,381.63 208,306,381.63 208,605,408.30 208,605,408.30 208,749,296.02 208,749,296.02 208,431,063.77 399,489,380.27
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 266,111,798.28 266,111,798.28 265,842,850.27 265,842,850.27 265,456,135.08 265,456,135.08 265,310,230.02 265,310,230.02 265,534,951.07 265,534,951.07 265,916,130.13 265,916,130.13 266,099,548.52 266,099,548.52 265,693,887.47 509,242,166.34
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 321,063,732.00 321,063,732.00 320,739,246.37 320,739,246.37 320,272,674.72 320,272,674.72 320,096,640.35 320,096,640.35 320,367,766.16 320,367,766.16 320,827,658.48 320,827,658.48 321,048,952.67 321,048,952.67 320,559,522.83 614,400,381.61
124 Pelat Rambu (Eng. Grade) Buah 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 355,497.95
125 Pelat Rambu (High L Grade) Buah 216,899.67 216,899.67 216,680.46 216,680.46 216,365.26 216,365.26 216,246.34 216,246.34 216,429.50 216,429.50 216,740.19 216,740.19 216,889.69 216,889.69 216,559.05 415,067.88
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
128 Pipa Drainase Baja Dia 3" M' 243,007.97 243,007.97 242,762.37 242,762.37 242,409.23 242,409.23 242,275.99 242,275.99 242,481.20 242,481.20 242,829.29 242,829.29 242,996.78 242,996.78 242,626.34 465,029.75
129 Pipa Galvanis Dia 1,5" M' 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
130 Pipa Galvanis Dia 2" M' 278,153.75 278,153.75 277,872.63 277,872.63 277,468.41 277,468.41 277,315.91 277,315.91 277,550.80 277,550.80 277,949.22 277,949.22 278,140.94 278,140.94 277,716.92 532,286.12
131 Pipa Galvanis Dia 3" M' 212,883.01 212,883.01 212,667.86 212,667.86 212,358.50 212,358.50 212,241.78 212,241.78 212,421.55 212,421.55 212,726.48 212,726.48 212,873.21 212,873.21 212,548.69 407,381.43
132 Pipa Porus M' 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
133 Pipa PVC Dia 4" M' 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
134 Plastik Filter M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
135 Rel Pengaman M' 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,816,534.76 1,816,534.76 1,814,698.86 1,814,698.86 1,812,059.06 1,812,059.06 1,811,063.09 1,811,063.09 1,812,597.08 1,812,597.08 1,815,199.09 1,815,199.09 1,816,451.14 1,816,451.14 1,813,682.01 3,476,193.47
137 Strip Bearing Buah 278,153.75 278,153.75 277,872.63 277,872.63 277,468.41 277,468.41 277,315.91 277,315.91 277,550.80 277,550.80 277,949.22 277,949.22 278,140.94 278,140.94 277,716.92 532,286.12
138 Tiang Pancang Baja Diameter 400 M' 643,669.86 643,669.86 643,019.33 643,019.33 642,083.95 642,083.95 641,731.03 641,731.03 642,274.59 642,274.59 643,196.58 643,196.58 643,640.23 643,640.23 642,659.02 1,231,752.36
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 786,261.31 786,261.31 785,466.67 785,466.67 784,324.07 784,324.07 783,892.98 783,892.98 784,556.94 784,556.94 785,683.19 785,683.19 786,225.12 786,225.12 785,026.54 1,504,621.05
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,644,822.52 1,644,822.52 1,643,160.16 1,643,160.16 1,640,769.90 1,640,769.90 1,639,868.07 1,639,868.07 1,641,257.06 1,641,257.06 1,643,613.10 1,643,613.10 1,644,746.80 1,644,746.80 1,642,239.43 3,147,598.07
HARGA SATUAN DASAR UPAH KABUPATEN PASURUAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
2 Tukang OH 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
3 Mandor OH 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
4 Operator OH 284,000 284,000 284,768.41 284,768.41 285,160.98 285,160.98 285,168.92 285,168.92 284,792.29 284,792.29 284,385.48 284,385.48 284,323.92 284,323.92 284,657.70 284,657.70 285,071.69 285,071.69
5 Pembantu Operator OH 178,000 178,000 178,481.61 178,481.61 178,727.66 178,727.66 178,732.63 178,732.63 178,496.57 178,496.57 178,241.61 178,241.61 178,203.02 178,203.02 178,412.22 178,412.22 178,671.69 178,671.69
6 Sopir OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
7 Pembantu Sopir OH 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
8 Mekanik OH 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
9 Pembantu Mekanik OH 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
10 Kepala Tukang OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
11 Pemasak Aspal OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88

HARGA SATUAN DASAR ALAT KABUPATEN PASURUAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 418,543 467,000 419,675.89 468,263.54 420,254.45 468,909.08 420,266.15 468,922.14 419,711.08 468,302.81 419,111.56 467,633.88 419,020.83 467,532.65 419,512.73 468,081.50 420,122.85 468,762.25
2 Asphalt Distribution Unit/Jam 257,702 331,000 258,399.17 331,895.57 258,755.39 332,353.12 258,762.60 332,362.37 258,420.84 331,923.40 258,051.70 331,449.28 257,995.84 331,377.53 258,298.71 331,766.54 258,674.36 332,249.04
3 Asphalt Finisher Unit/Jam 189,278 898,000 189,789.73 900,429.68 190,051.37 901,671.00 190,056.66 901,696.10 189,805.65 900,505.19 189,534.53 899,218.89 189,493.50 899,024.23 189,715.95 900,079.62 189,991.86 901,388.65
4 Asphalt Liquid Mixer Unit/Jam 67,536 124,000 67,718.40 124,335.50 67,811.76 124,506.91 67,813.65 124,510.37 67,724.08 124,345.93 67,627.34 124,168.31 67,612.70 124,141.43 67,692.08 124,287.16 67,790.52 124,467.92
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 90,640 90,640 90,885.22 90,885.22 91,010.52 91,010.52 91,013.05 91,013.05 90,892.85 90,892.85 90,763.01 90,763.01 90,743.37 90,743.37 90,849.89 90,849.89 90,982.02 90,982.02
6 Asphalt Mixing Plant Unit/Jam 1,013,035 5,196,336 1,015,776.03 5,210,395.54 1,017,176.37 5,217,578.53 1,017,204.69 5,217,723.77 1,015,861.21 5,210,832.47 1,014,410.14 5,203,389.25 1,014,190.55 5,202,262.85 1,015,381.14 5,208,369.93 1,016,857.85 5,215,944.67
7 Asphalt Sprayer Unit/Jam 83,531 83,531 83,756.97 83,756.97 83,872.44 83,872.44 83,874.77 83,874.77 83,763.99 83,763.99 83,644.35 83,644.35 83,626.24 83,626.24 83,724.41 83,724.41 83,846.17 83,846.17
8 Asphalt Tanker Unit/Jam 390,996 453,000 392,053.91 454,225.66 392,594.39 454,851.85 392,605.32 454,864.51 392,086.78 454,263.75 391,526.72 453,614.88 391,441.97 453,516.68 391,901.49 454,049.08 392,471.45 454,709.42
9 Blending Equipment Unit/Jam 127,074 201,000 127,417.52 201,543.84 127,593.18 201,821.68 127,596.73 201,827.30 127,428.20 201,560.74 127,246.18 201,272.83 127,218.64 201,229.26 127,367.98 201,465.48 127,553.22 201,758.48
10 Bore Pile Machine Unit/Jam 350,119 609,000 351,066.45 610,647.74 351,550.43 611,489.57 351,560.22 611,506.60 351,095.89 610,698.95 350,594.38 609,826.62 350,518.49 609,694.61 350,929.97 610,410.35 351,440.34 611,298.09
11 Bore Pile Machine Dia 60 Unit/Jam 229,266 693,000 229,886.15 694,875.02 230,203.07 695,832.96 230,209.48 695,852.33 229,905.43 694,933.29 229,577.03 693,940.64 229,527.34 693,790.42 229,796.78 694,604.88 230,130.99 695,615.07
12 Bore Pile Machine Dia 80 Unit/Jam 906,400 906,400 908,852.24 908,852.24 910,105.17 910,105.17 910,130.51 910,130.51 908,928.45 908,928.45 907,630.13 907,630.13 907,433.65 907,433.65 908,498.91 908,498.91 909,820.18 909,820.18
13 Bulldozer 100-150 HP Unit/Jam 355,451 515,000 356,412.64 516,393.41 356,903.99 517,105.31 356,913.92 517,119.70 356,442.53 516,436.72 355,933.38 515,699.03 355,856.33 515,587.39 356,274.08 516,192.66 356,792.23 516,943.38
14 Cement Tanker Unit/Jam 330,569 427,000 331,463.76 428,155.31 331,920.71 428,745.56 331,929.95 428,757.50 331,491.55 428,191.22 331,018.05 427,579.58 330,946.39 427,487.02 331,334.90 427,988.86 331,816.77 428,611.30
15 Cold Milling Unit/Jam 516,292 1,099,000 517,689.36 1,101,973.51 518,403.04 1,103,492.68 518,417.48 1,103,523.40 517,732.78 1,102,065.92 516,993.24 1,100,491.72 516,881.32 1,100,253.49 517,488.11 1,101,545.11 518,240.71 1,103,147.13
16 Cold Recycler Unit/Jam 4,348,053 4,348,053 4,359,817.66 4,359,817.66 4,365,828.05 4,365,828.05 4,365,949.58 4,365,949.58 4,360,183.26 4,360,183.26 4,353,955.12 4,353,955.12 4,353,012.60 4,353,012.60 4,358,122.73 4,358,122.73 4,364,460.92 4,364,460.92
17 Compressor 4000-6500 L\M Unit/Jam 132,405 132,405 132,763.71 132,763.71 132,946.74 132,946.74 132,950.44 132,950.44 132,774.84 132,774.84 132,585.19 132,585.19 132,556.48 132,556.48 132,712.10 132,712.10 132,905.10 132,905.10
18 Concrete Breaker Unit/Jam 482,525 920,000 483,830.16 922,489.20 484,497.17 923,760.93 484,510.65 923,786.65 483,870.74 922,566.56 483,179.57 921,248.75 483,074.97 921,049.33 483,642.07 922,130.57 484,345.45 923,471.66
19 Concrete Mixer (350) Unit/Jam 89,751 89,751 89,994.19 89,994.19 90,118.26 90,118.26 90,120.77 90,120.77 90,001.74 90,001.74 89,873.18 89,873.18 89,853.72 89,853.72 89,959.21 89,959.21 90,090.04 90,090.04
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 102,192 102,192 102,468.63 102,468.63 102,609.90 102,609.90 102,612.75 102,612.75 102,477.23 102,477.23 102,330.85 102,330.85 102,308.70 102,308.70 102,428.80 102,428.80 102,577.77 102,577.77
21 Concrete Pan Mixer Unit/Jam 271,920 582,000 272,655.67 583,574.69 273,031.55 584,379.20 273,039.15 584,395.47 272,678.54 583,623.63 272,289.04 582,789.97 272,230.10 582,663.81 272,549.67 583,347.82 272,946.05 584,196.20
22 Concrete Pump Unit/Jam 207,050 222,000 207,610.36 222,600.66 207,896.57 222,907.53 207,902.36 222,913.73 207,627.77 222,619.32 207,331.20 222,301.33 207,286.31 222,253.21 207,529.65 222,514.12 207,831.47 222,837.73
23 Concrete Vibrator Unit/Jam 77,311 77,311 77,519.75 77,519.75 77,626.62 77,626.62 77,628.78 77,628.78 77,526.25 77,526.25 77,415.51 77,415.51 77,398.75 77,398.75 77,489.61 77,489.61 77,602.31 77,602.31
24 Crane 10-15 Ton Unit/Jam 277,252 277,252 278,001.86 278,001.86 278,385.11 278,385.11 278,392.86 278,392.86 278,025.17 278,025.17 277,628.04 277,628.04 277,567.94 277,567.94 277,893.79 277,893.79 278,297.94 278,297.94
25 Crane On Track 35 Ton Unit/Jam 230,154 437,000 230,777.19 438,182.37 231,095.33 438,786.44 231,101.77 438,798.66 230,796.54 438,219.12 230,466.87 437,593.16 230,416.98 437,498.43 230,687.47 438,012.02 231,022.97 438,649.04
26 Crane On Track 75-100 Ton Unit/Jam 361,671 548,000 362,649.86 549,482.70 363,149.81 550,240.21 363,159.92 550,255.53 362,680.28 549,528.78 362,162.22 548,743.82 362,083.82 548,625.03 362,508.88 549,269.08 363,036.09 550,067.90
27 Dump Truck 10 Ton Unit/Jam 342,122 368,000 343,047.17 368,995.68 343,520.09 369,504.37 343,529.65 369,514.66 343,075.94 369,026.62 342,585.88 368,499.50 342,511.72 368,419.73 342,913.81 368,852.23 343,412.52 369,388.67
28 Dump Truck 3-4 M3 Unit/Jam 186,612 189,000 187,116.64 189,511.37 187,374.59 189,772.63 187,379.81 189,777.91 187,132.33 189,527.26 186,865.03 189,256.54 186,824.58 189,215.57 187,043.89 189,437.69 187,315.92 189,713.20
29 Excavator 80-140 HP Unit/Jam 270,143 429,000 270,873.61 430,160.73 271,247.03 430,753.74 271,254.58 430,765.73 270,896.32 430,196.80 270,509.37 429,582.30 270,450.81 429,489.31 270,768.30 429,993.50 271,162.09 430,618.85
30 Flat Bed Truck 3-4 M3 Unit/Jam 327,903 438,000 328,790.66 439,185.08 329,243.93 439,790.53 329,253.10 439,802.77 328,818.24 439,221.91 328,348.55 438,594.52 328,277.47 438,499.57 328,662.84 439,014.34 329,140.83 439,652.81
31 Fulvi Mixer Unit/Jam 821,092 1,282,000 823,313.21 1,285,468.65 824,448.22 1,287,240.78 824,471.17 1,287,276.61 823,382.25 1,285,576.45 822,206.12 1,283,740.11 822,028.13 1,283,462.21 822,993.13 1,284,968.91 824,190.04 1,286,837.69
32 Generator Set Unit/Jam 365,226 387,000 366,213.99 388,047.09 366,718.85 388,582.05 366,729.06 388,592.86 366,244.70 388,079.63 365,721.55 387,525.29 365,642.38 387,441.40 366,071.62 387,896.23 366,604.01 388,460.36
33 Hot Recycler Unit/Jam 2,682,766 7,867,000 2,690,024.42 7,888,285.37 2,693,732.86 7,899,160.07 2,693,807.85 7,899,379.97 2,690,250.01 7,888,946.87 2,686,407.22 7,877,678.20 2,685,825.68 7,875,972.88 2,688,978.64 7,885,218.71 2,692,889.33 7,896,686.50
34 Jack Hammer Unit/Jam 50,652 50,652 50,788.80 50,788.80 50,858.82 50,858.82 50,860.23 50,860.23 50,793.06 50,793.06 50,720.51 50,720.51 50,709.53 50,709.53 50,769.06 50,769.06 50,842.89 50,842.89
35 Launching Gantry Unit/Jam 64,460,135 64,461,000 64,634,541.80 64,635,409.12 64,723,646.23 64,724,514.75 64,725,447.98 64,726,316.52 64,639,961.95 64,640,829.35 64,547,629.38 64,548,495.54 64,533,656.47 64,534,522.44 64,609,414.34 64,610,281.33 64,703,378.38 64,704,246.63
36 Motor Grader > 100 HP Unit/Jam 253,259 426,000 253,944.01 427,152.61 254,294.09 427,741.48 254,301.17 427,753.38 253,965.30 427,188.43 253,602.54 426,578.23 253,547.64 426,485.88 253,845.28 426,986.55 254,214.46 427,607.53
37 Pedestrian Roller Unit/Jam 83,531 84,000 83,756.97 84,227.27 83,872.44 84,343.39 83,874.77 84,345.74 83,763.99 84,234.34 83,644.35 84,114.02 83,626.24 84,095.81 83,724.41 84,194.53 83,846.17 84,316.98
38 Pile Driver + Hammer Unit/Jam 95,083 278,000 95,340.38 278,752.17 95,471.82 279,136.46 95,474.47 279,144.23 95,348.38 278,775.55 95,212.18 278,377.34 95,191.57 278,317.08 95,303.32 278,643.80 95,441.92 279,049.05
39 Rock Drill Breaker Unit/Jam 92,417 300,000 92,667.29 300,811.70 92,795.04 301,226.39 92,797.62 301,234.78 92,675.06 300,836.92 92,542.68 300,407.20 92,522.65 300,342.17 92,631.26 300,694.75 92,765.98 301,132.06
40 Split Form Paver Unit/Jam 195,498 196,000 196,026.95 196,530.31 196,297.19 196,801.24 196,302.66 196,806.72 196,043.39 196,546.79 195,763.36 196,266.04 195,720.98 196,223.55 195,950.75 196,453.90 196,235.72 196,739.62
41 Stone Crusher Unit/Jam 523,401 652,000 524,817.62 653,764.09 525,541.12 654,665.36 525,555.75 654,683.58 524,861.63 653,818.91 524,111.91 652,884.99 523,998.45 652,743.65 524,613.59 653,509.93 525,376.55 654,460.35
42 Tamper Unit/Jam 78,199 78,199 78,410.78 78,410.78 78,518.88 78,518.88 78,521.06 78,521.06 78,417.36 78,417.36 78,305.34 78,305.34 78,288.39 78,288.39 78,380.30 78,380.30 78,494.29 78,494.29
43 Tandem Roller 6-8 T Unit/Jam 377,667 441,000 378,688.43 442,193.19 379,210.49 442,802.80 379,221.05 442,815.12 378,720.19 442,230.27 378,179.22 441,598.59 378,097.35 441,502.99 378,541.21 442,021.29 379,091.74 442,664.13
44 Three Wheel Roller 6-8 T Unit/Jam 125,296 158,000 125,635.46 158,427.49 125,808.66 158,645.90 125,812.16 158,650.32 125,645.99 158,440.78 125,466.52 158,214.46 125,439.36 158,180.21 125,586.61 158,365.90 125,769.26 158,596.22
45 Tire Roller 8-10 T Unit/Jam 223,934 404,000 224,539.97 405,093.08 224,849.51 405,651.54 224,855.77 405,662.83 224,558.79 405,127.05 224,238.03 404,548.37 224,189.49 404,460.79 224,452.67 404,935.60 224,779.10 405,524.51
46 Track Loader 75-100 HP Unit/Jam 209,716 276,000 210,283.46 276,746.76 210,573.35 277,128.28 210,579.22 277,135.99 210,301.09 276,769.97 210,000.70 276,374.63 209,955.24 276,314.80 210,201.71 276,639.17 210,507.41 277,041.50
47 Trailer 20 Ton Unit/Jam 338,567 468,000 339,483.04 469,266.25 339,951.05 469,913.17 339,960.51 469,926.25 339,511.51 469,305.60 339,026.55 468,635.24 338,953.16 468,533.79 339,351.06 469,083.81 339,844.60 469,766.02
48 Trailler 15 Ton Unit/Jam 293,247 446,000 294,040.43 447,206.72 294,445.79 447,823.24 294,453.99 447,835.70 294,065.09 447,244.22 293,645.04 446,605.37 293,581.48 446,508.70 293,926.12 447,032.86 294,353.59 447,683.00
49 Truck Mixer (agitator) Unit/Jam 368,780 542,000 369,778.12 543,466.46 370,287.89 544,215.68 370,298.20 544,230.83 369,809.13 543,512.04 369,280.89 542,735.68 369,200.95 542,618.19 369,634.36 543,255.18 370,171.94 544,045.26
50 Vibrating Rammer Unit/Jam 75,533 75,533 75,737.69 75,737.69 75,842.10 75,842.10 75,844.21 75,844.21 75,744.04 75,744.04 75,635.84 75,635.84 75,619.47 75,619.47 75,708.24 75,708.24 75,818.35 75,818.35
51 Vibratory Roller 5-8 T Unit/Jam 182,169 391,000 182,661.48 392,057.91 182,913.29 392,598.40 182,918.39 392,609.33 182,676.80 392,090.79 182,415.86 391,530.72 182,376.37 391,445.96 182,590.47 391,905.49 182,856.02 392,475.46
52 Water Pump 70-100 MM Unit/Jam 56,872 56,872 57,026.02 57,026.02 57,104.64 57,104.64 57,106.23 57,106.23 57,030.81 57,030.81 56,949.34 56,949.34 56,937.01 56,937.01 57,003.85 57,003.85 57,086.76 57,086.76
53 Water Tanker 3000-4500 L Unit/Jam 206,162 206,162 206,719.33 206,719.33 207,004.31 207,004.31 207,010.08 207,010.08 206,736.67 206,736.67 206,441.36 206,441.36 206,396.67 206,396.67 206,638.97 206,638.97 206,939.49 206,939.49
54 Welding Set Unit/Jam 115,522 115,522 115,834.11 115,834.11 115,993.80 115,993.80 115,997.03 115,997.03 115,843.82 115,843.82 115,678.35 115,678.35 115,653.31 115,653.31 115,789.08 115,789.08 115,957.47 115,957.47
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 200,830 320,000 201,373.14 320,865.81 201,650.75 321,308.15 201,656.37 321,317.10 201,390.03 320,892.72 201,102.36 320,434.35 201,058.83 320,364.98 201,294.86 320,741.07 201,587.61 321,207.54
HARGA SATUAN DASAR BAHAN KABUPATEN PASURUAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 280,000 280,000 280,757.58 280,757.58 281,144.63 281,144.63 281,152.46 281,152.46 280,781.13 280,781.13 280,380.06 280,380.06 280,319.36 280,319.36 280,648.44 280,648.44 281,056.59 281,056.59
2 Agregat Pecah Mesin 20-30 mm M3 267,000 267,000 267,722.41 267,722.41 268,091.49 268,091.49 268,098.95 268,098.95 267,744.86 267,744.86 267,362.41 267,362.41 267,304.53 267,304.53 267,618.33 267,618.33 268,007.54 268,007.54
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 306,000 306,000 306,827.93 306,827.93 307,250.92 307,250.92 307,259.47 307,259.47 306,853.66 306,853.66 306,415.35 306,415.35 306,349.02 306,349.02 306,708.65 306,708.65 307,154.71 307,154.71
4 Bahan Agr. Base Kelas A M3 293,000 293,000 293,792.76 293,792.76 294,197.78 294,197.78 294,205.97 294,205.97 293,817.39 293,817.39 293,397.70 293,397.70 293,334.19 293,334.19 293,678.54 293,678.54 294,105.65 294,105.65
5 Bahan Agr. Base Kelas B M3 275,000 275,000 275,744.05 275,744.05 276,124.19 276,124.19 276,131.88 276,131.88 275,767.18 275,767.18 275,373.27 275,373.27 275,313.66 275,313.66 275,636.86 275,636.86 276,037.73 276,037.73
6 Bahan Agr. Base Kelas C M3 253,000 253,000 253,684.53 253,684.53 254,034.26 254,034.26 254,041.33 254,041.33 253,705.80 253,705.80 253,343.41 253,343.41 253,288.56 253,288.56 253,585.91 253,585.91 253,954.71 253,954.71
7 Bahan Agr. Base Kelas C2 M3 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
8 Bahan Agr. Base Kelas S M3 187,000 187,000 187,505.96 187,505.96 187,764.45 187,764.45 187,769.68 187,769.68 187,521.68 187,521.68 187,253.82 187,253.82 187,213.29 187,213.29 187,433.06 187,433.06 187,705.65 187,705.65
9 Bahan Pilihan M3 187,000 187,000 187,505.96 187,505.96 187,764.45 187,764.45 187,769.68 187,769.68 187,521.68 187,521.68 187,253.82 187,253.82 187,213.29 187,213.29 187,433.06 187,433.06 187,705.65 187,705.65
10 Bahan Tanah Timbunan M3 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
11 Batu Belah/Kerakal M3 311,000 311,000 311,841.46 311,841.46 312,271.36 312,271.36 312,280.05 312,280.05 311,867.61 311,867.61 311,422.13 311,422.13 311,354.72 311,354.72 311,720.23 311,720.23 312,173.57 312,173.57
12 Batu Kali M3 311,000 311,000 311,841.46 311,841.46 312,271.36 312,271.36 312,280.05 312,280.05 311,867.61 311,867.61 311,422.13 311,422.13 311,354.72 311,354.72 311,720.23 311,720.23 312,173.57 312,173.57
13 Chipping M3 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
14 Chipping (kg) Kg 270 270 270.73 270.73 271.10 271.10 271.11 271.11 270.75 270.75 270.37 270.37 270.31 270.31 270.63 270.63 271.02 271.02
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 355,000 355,000 355,960.51 355,960.51 356,451.23 356,451.23 356,461.15 356,461.15 355,990.36 355,990.36 355,481.86 355,481.86 355,404.90 355,404.90 355,822.12 355,822.12 356,339.61 356,339.61
18 Kapur M3 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
19 Pasir Beton (Kasar) M3 222,000 222,000 222,600.66 222,600.66 222,907.53 222,907.53 222,913.73 222,913.73 222,619.32 222,619.32 222,301.33 222,301.33 222,253.21 222,253.21 222,514.12 222,514.12 222,837.73 222,837.73
20 Pasir Halus (untuk HRS) M3 267,000 267,000 267,722.41 267,722.41 268,091.49 268,091.49 268,098.95 268,098.95 267,744.86 267,744.86 267,362.41 267,362.41 267,304.53 267,304.53 267,618.33 267,618.33 268,007.54 268,007.54
21 Pasir Pasang (Sedang) M3 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
22 Pasir Urug M3 181,000 181,000 181,489.72 181,489.72 181,739.92 181,739.92 181,744.98 181,744.98 181,504.94 181,504.94 181,245.68 181,245.68 181,206.44 181,206.44 181,419.17 181,419.17 181,683.01 181,683.01
23 Pasir Urug (ada unsur lempung) M3 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
24 Sirtu M3 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
26 Anti Pengelupas Liter 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
27 Arbocell Kg 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
40 Beton B-0 M3 524,290 524,290 525,708.65 525,708.65 526,433.38 526,433.38 526,448.04 526,448.04 525,752.73 525,752.73 525,001.74 525,001.74 524,888.09 524,888.09 525,504.27 525,504.27 526,268.53 526,268.53
41 Beton K-125 (fc' 10 MPa) M3 542,063 542,063 543,529.28 543,529.28 544,278.58 544,278.58 544,293.74 544,293.74 543,574.86 543,574.86 542,798.41 542,798.41 542,680.91 542,680.91 543,317.98 543,317.98 544,108.15 544,108.15
42 Beton K-175 (fc' 15 MPa) M3 586,494 586,494 588,080.86 588,080.86 588,891.58 588,891.58 588,907.98 588,907.98 588,130.18 588,130.18 587,290.08 587,290.08 587,162.95 587,162.95 587,852.24 587,852.24 588,707.17 588,707.17
43 Beton K-250 (fc' 20 MPa) M3 653,141 653,141 654,908.23 654,908.23 655,811.08 655,811.08 655,829.34 655,829.34 654,963.15 654,963.15 654,027.59 654,027.59 653,886.01 653,886.01 654,653.63 654,653.63 655,605.72 655,605.72
44 Beton K-300 (fc' 25 MPa) M3 679,800 679,800 681,639.18 681,639.18 682,578.88 682,578.88 682,597.88 682,597.88 681,696.34 681,696.34 680,722.60 680,722.60 680,575.24 680,575.24 681,374.18 681,374.18 682,365.13 682,365.13
45 Beton K-350 (fc' 30 MPa) M3 706,459 706,459 708,370.13 708,370.13 709,346.68 709,346.68 709,366.43 709,366.43 708,429.53 708,429.53 707,417.60 707,417.60 707,264.46 707,264.46 708,094.74 708,094.74 709,124.55 709,124.55
46 Beton K-400 (fc' 35 MPa) M3 733,118 733,118 735,101.08 735,101.08 736,114.48 736,114.48 736,134.97 736,134.97 735,162.72 735,162.72 734,112.60 734,112.60 733,953.69 733,953.69 734,815.30 734,815.30 735,883.97 735,883.97
47 Beton K-450 (fc' 40 MPa) M3 768,663 768,663 770,742.34 770,742.34 771,804.88 771,804.88 771,826.36 771,826.36 770,806.97 770,806.97 769,705.94 769,705.94 769,539.32 769,539.32 770,442.71 770,442.71 771,563.19 771,563.19
48 Beton K-500 (fc' 45 MPa) M3 799,765 799,765 801,928.45 801,928.45 803,033.98 803,033.98 803,056.33 803,056.33 801,995.70 801,995.70 800,850.11 800,850.11 800,676.75 800,676.75 801,616.69 801,616.69 802,782.51 802,782.51
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 76,000 76,000 76,205.63 76,205.63 76,310.69 76,310.69 76,312.81 76,312.81 76,212.02 76,212.02 76,103.16 76,103.16 76,086.68 76,086.68 76,176.00 76,176.00 76,286.79 76,286.79
51 Cat Anti Karat Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
52 Cat Marka (Non Thermoplas) Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
53 Cat Marka (Thermoplastic) Kg 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
54 Cerucuk Diameter 10-15 cm M' 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,160,000 1,160,000 1,163,138.56 1,163,138.56 1,164,742.05 1,164,742.05 1,164,774.47 1,164,774.47 1,163,236.10 1,163,236.10 1,161,574.52 1,161,574.52 1,161,323.06 1,161,323.06 1,162,686.37 1,162,686.37 1,164,377.31 1,164,377.31
57 Curing Compound Liter 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 542,000 542,000 543,466.46 543,466.46 544,215.68 544,215.68 544,230.83 544,230.83 543,512.04 543,512.04 542,735.68 542,735.68 542,618.19 542,618.19 543,255.18 543,255.18 544,045.26 544,045.26
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 631,000 631,000 632,707.27 632,707.27 633,579.51 633,579.51 633,597.15 633,597.15 632,760.33 632,760.33 631,856.48 631,856.48 631,719.70 631,719.70 632,461.29 632,461.29 633,381.11 633,381.11
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 800,000 800,000 802,164.52 802,164.52 803,270.38 803,270.38 803,292.74 803,292.74 802,231.79 802,231.79 801,085.87 801,085.87 800,912.46 800,912.46 801,852.67 801,852.67 803,018.84 803,018.84
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
64 Oxygen (Isi 6 M3) Botol 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
65 Polytene 125 Mikron Kg 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
66 Sand Sheet Ton 1,226,000 1,226,000 1,229,317.13 1,229,317.13 1,231,011.85 1,231,011.85 1,231,046.12 1,231,046.12 1,229,420.22 1,229,420.22 1,227,664.10 1,227,664.10 1,227,398.34 1,227,398.34 1,228,839.22 1,228,839.22 1,230,626.37 1,230,626.37
67 Seal Coat M2 98,000 98,000 98,265.15 98,265.15 98,400.62 98,400.62 98,403.36 98,403.36 98,273.39 98,273.39 98,133.02 98,133.02 98,111.78 98,111.78 98,226.95 98,226.95 98,369.81 98,369.81
68 Seal Guard Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
69 Semen/PC (50 kg) Zak 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,552,000 11,552,000 11,583,255.71 11,583,255.71 11,599,224.25 11,599,224.25 11,599,547.14 11,599,547.14 11,584,227.06 11,584,227.06 11,567,680.00 11,567,680.00 11,565,175.89 11,565,175.89 11,578,752.58 11,578,752.58 11,595,592.02 11,595,592.02
87 Box Culvert Type DUB 200×200 M' 12,263,000 12,263,000 12,296,179.43 12,296,179.43 12,313,130.80 12,313,130.80 12,313,473.56 12,313,473.56 12,297,210.57 12,297,210.57 12,279,645.07 12,279,645.07 12,276,986.84 12,276,986.84 12,291,399.14 12,291,399.14 12,309,275.01 12,309,275.01
88 Box Culvert Type uk 300×200 M' 13,241,000 13,241,000 13,276,825.56 13,276,825.56 13,295,128.83 13,295,128.83 13,295,498.94 13,295,498.94 13,277,938.93 13,277,938.93 13,258,972.55 13,258,972.55 13,256,102.32 13,256,102.32 13,271,664.03 13,271,664.03 13,290,965.54 13,290,965.54
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 172,000 172,000 172,465.37 172,465.37 172,703.13 172,703.13 172,707.94 172,707.94 172,479.84 172,479.84 172,233.46 172,233.46 172,196.18 172,196.18 172,398.32 172,398.32 172,649.05 172,649.05
91 Ducting (Strand Prestress) M' 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 1,934,000 1,934,000 1,939,232.73 1,939,232.73 1,941,906.14 1,941,906.14 1,941,960.20 1,941,960.20 1,939,395.35 1,939,395.35 1,936,625.10 1,936,625.10 1,936,205.87 1,936,205.87 1,938,478.83 1,938,478.83 1,941,298.04 1,941,298.04
94 Expansion Join Tipe Rubber M' 1,400,000 1,400,000 1,403,787.91 1,403,787.91 1,405,723.16 1,405,723.16 1,405,762.29 1,405,762.29 1,403,905.63 1,403,905.63 1,401,900.28 1,401,900.28 1,401,596.80 1,401,596.80 1,403,242.18 1,403,242.18 1,405,282.97 1,405,282.97
95 Expansion Join Tipe Torma M' 1,606,000 1,606,000 1,610,345.28 1,610,345.28 1,612,565.28 1,612,565.28 1,612,610.17 1,612,610.17 1,610,480.32 1,610,480.32 1,608,179.89 1,608,179.89 1,607,831.76 1,607,831.76 1,609,719.24 1,609,719.24 1,612,060.32 1,612,060.32
96 Expansion Tipe Joint Asphaltic Plug M' 1,905,000 1,905,000 1,910,154.27 1,910,154.27 1,912,787.59 1,912,787.59 1,912,840.83 1,912,840.83 1,910,314.45 1,910,314.45 1,907,585.73 1,907,585.73 1,907,172.79 1,907,172.79 1,909,411.67 1,909,411.67 1,912,188.61 1,912,188.61
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
99 Glass Bead Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
100 Joint Sealent Kg 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
101 Joint Socket Pile 16×16×16 Set 81,000 81,000 81,219.16 81,219.16 81,331.13 81,331.13 81,333.39 81,333.39 81,225.97 81,225.97 81,109.94 81,109.94 81,092.39 81,092.39 81,187.58 81,187.58 81,305.66 81,305.66
102 Joint Socket Pile 35×35 Set 695,000 695,000 696,880.43 696,880.43 697,841.14 697,841.14 697,860.57 697,860.57 696,938.87 696,938.87 695,943.35 695,943.35 695,792.70 695,792.70 696,609.51 696,609.51 697,622.62 697,622.62
103 Kawat Beton Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
104 Kawat Bronjong Kg 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80 27,062.53 27,062.53 27,101.89 27,101.89
105 Kawat Las Dos 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
106 Kayu Acuan (Kelas III/Meranti) M3 3,821,000 3,821,000 3,831,338.30 3,831,338.30 3,836,620.14 3,836,620.14 3,836,726.94 3,836,726.94 3,831,659.59 3,831,659.59 3,826,186.40 3,826,186.40 3,825,358.13 3,825,358.13 3,829,848.82 3,829,848.82 3,835,418.72 3,835,418.72
107 Kayu Perancah (Gelam) M3 2,461,000 2,461,000 2,467,658.61 2,467,658.61 2,471,060.50 2,471,060.50 2,471,129.29 2,471,129.29 2,467,865.55 2,467,865.55 2,464,340.42 2,464,340.42 2,463,806.95 2,463,806.95 2,466,699.28 2,466,699.28 2,470,286.70 2,470,286.70
108 Kerb Pracetak Type 1 (Peninggi) Buah 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
110 Marmer Nama Jembatan Buah 533,000 533,000 534,442.11 534,442.11 535,178.89 535,178.89 535,193.79 535,193.79 534,486.93 534,486.93 533,723.46 533,723.46 533,607.93 533,607.93 534,234.34 534,234.34 535,011.30 535,011.30
111 Mata Kucing Buah 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
112 Matras Concrete (Tebal=10 cm) M2 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
113 Mini Pile 16×16×16 M' 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
114 Mini Timber Pile Buah 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
115 Multipleks 12 mm Lbr 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
116 Paku Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
117 Paving Block (Model Bata 8 cm) M2 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 59,074,000 59,074,000 59,233,833.76 59,233,833.76 59,315,492.84 59,315,492.84 59,317,144.04 59,317,144.04 59,238,801.03 59,238,801.03 59,154,183.55 59,154,183.55 59,141,378.18 59,141,378.18 59,210,805.90 59,210,805.90 59,296,918.53 59,296,918.53
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 83,689,000 83,689,000 83,915,433.42 83,915,433.42 84,031,118.27 84,031,118.27 84,033,457.49 84,033,457.49 83,922,470.44 83,922,470.44 83,802,594.49 83,802,594.49 83,784,453.37 83,784,453.37 83,882,810.29 83,882,810.29 84,004,804.39 84,004,804.39
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 159,953,000 159,953,000 160,385,777.36 160,385,777.36 160,606,883.35 160,606,883.35 160,611,354.24 160,611,354.24 160,399,227.08 160,399,227.08 160,170,110.72 160,170,110.72 160,135,437.98 160,135,437.98 160,323,425.46 160,323,425.46 160,556,590.19 160,556,590.19
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 209,753,000 209,753,000 210,320,518.90 210,320,518.90 210,610,464.34 210,610,464.34 210,616,327.21 210,616,327.21 210,338,156.07 210,338,156.07 210,037,706.29 210,037,706.29 209,992,238.49 209,992,238.49 210,238,754.27 210,238,754.27 210,544,512.84 210,544,512.84
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 267,380,000 267,380,000 268,103,437.58 268,103,437.58 268,473,041.89 268,473,041.89 268,480,515.51 268,480,515.51 268,125,920.34 268,125,920.34 267,742,925.76 267,742,925.76 267,684,966.26 267,684,966.26 267,999,209.15 267,999,209.15 268,388,971.05 268,388,971.05
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 322,593,000 322,593,000 323,465,824.81 323,465,824.81 323,911,751.07 323,911,751.07 323,920,767.97 323,920,767.97 323,492,950.19 323,492,950.19 323,030,868.61 323,030,868.61 322,960,940.68 322,960,940.68 323,340,073.59 323,340,073.59 323,810,319.91 323,810,319.91
124 Pelat Rambu (Eng. Grade) Buah 187,000 187,000 187,505.96 187,505.96 187,764.45 187,764.45 187,769.68 187,769.68 187,521.68 187,521.68 187,253.82 187,253.82 187,213.29 187,213.29 187,433.06 187,433.06 187,705.65 187,705.65
125 Pelat Rambu (High L Grade) Buah 218,000 218,000 218,589.83 218,589.83 218,891.18 218,891.18 218,897.27 218,897.27 218,608.16 218,608.16 218,295.90 218,295.90 218,248.64 218,248.64 218,504.85 218,504.85 218,822.63 218,822.63
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
128 Pipa Drainase Baja Dia 3" M' 245,000 245,000 245,662.89 245,662.89 246,001.55 246,001.55 246,008.40 246,008.40 245,683.49 245,683.49 245,332.55 245,332.55 245,279.44 245,279.44 245,567.38 245,567.38 245,924.52 245,924.52
129 Pipa Galvanis Dia 1,5" M' 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
130 Pipa Galvanis Dia 2" M' 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
131 Pipa Galvanis Dia 3" M' 214,000 214,000 214,579.01 214,579.01 214,874.83 214,874.83 214,880.81 214,880.81 214,597.00 214,597.00 214,290.47 214,290.47 214,244.08 214,244.08 214,495.59 214,495.59 214,807.54 214,807.54
132 Pipa Porus M' 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
133 Pipa PVC Dia 4" M' 104,000 104,000 104,281.39 104,281.39 104,425.15 104,425.15 104,428.06 104,428.06 104,290.13 104,290.13 104,141.16 104,141.16 104,118.62 104,118.62 104,240.85 104,240.85 104,392.45 104,392.45
134 Plastik Filter M2 31,991 31,991 32,077.14 32,077.14 32,121.36 32,121.36 32,122.25 32,122.25 32,079.83 32,079.83 32,034.00 32,034.00 32,027.07 32,027.07 32,064.67 32,064.67 32,111.30 32,111.30
135 Rel Pengaman M' 151,067 151,067 151,475.37 151,475.37 151,684.20 151,684.20 151,688.42 151,688.42 151,488.08 151,488.08 151,271.69 151,271.69 151,238.94 151,238.94 151,416.49 151,416.49 151,636.70 151,636.70
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,825,240 1,825,240 1,830,178.92 1,830,178.92 1,832,701.99 1,832,701.99 1,832,753.00 1,832,753.00 1,830,332.40 1,830,332.40 1,827,717.93 1,827,717.93 1,827,322.27 1,827,322.27 1,829,467.42 1,829,467.42 1,832,128.09 1,832,128.09
137 Strip Bearing Buah 279,918 279,918 280,674.96 280,674.96 281,061.89 281,061.89 281,069.72 281,069.72 280,698.49 280,698.49 280,297.54 280,297.54 280,236.86 280,236.86 280,565.84 280,565.84 280,973.88 280,973.88
138 Tiang Pancang Baja Diameter 400 M' 613,000 613,000 614,658.57 614,658.57 615,505.93 615,505.93 615,523.06 615,523.06 614,710.11 614,710.11 613,832.05 613,832.05 613,699.17 613,699.17 614,419.61 614,419.61 615,313.18 615,313.18
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 786,000 786,000 788,126.64 788,126.64 789,213.15 789,213.15 789,235.12 789,235.12 788,192.73 788,192.73 787,066.87 787,066.87 786,896.49 786,896.49 787,820.25 787,820.25 788,966.01 788,966.01
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,600,000 1,600,000 1,604,329.05 1,604,329.05 1,606,540.75 1,606,540.75 1,606,585.48 1,606,585.48 1,604,463.58 1,604,463.58 1,602,171.75 1,602,171.75 1,601,824.92 1,601,824.92 1,603,705.34 1,603,705.34 1,606,037.68 1,606,037.68
HARGA SATUAN DASAR UPAH KABUPATEN PASURUAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 107,276.93
2 Tukang OH 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 120,310.58
3 Mandor OH 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 138,357.17
4 Operator OH 285,182.90 285,182.90 284,894.68 284,894.68 284,480.25 284,480.25 284,323.89 284,323.89 284,564.72 284,564.72 284,973.21 284,973.21 285,169.78 285,169.78 284,735.04 284,735.04
5 Pembantu Operator OH 178,741.40 178,741.40 178,560.75 178,560.75 178,301.00 178,301.00 178,203.00 178,203.00 178,353.94 178,353.94 178,609.97 178,609.97 178,733.17 178,733.17 178,460.70 178,460.70
6 Sopir OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23
7 Pembantu Sopir OH 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 116,300.23
8 Mekanik OH 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 160,414.11
9 Pembantu Mekanik OH 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 116,300.23
10 Kepala Tukang OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23
11 Pemasak Aspal OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23

HARGA SATUAN DASAR ALAT KABUPATEN PASURUAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 420,286.75 468,945.13 419,861.98 468,471.18 419,251.22 467,789.71 419,020.78 467,532.59 419,375.70 467,928.60 419,977.72 468,600.32 420,267.40 468,923.54 419,626.72 852,859.47
2 Asphalt Distribution Unit/Jam 258,775.28 332,378.66 258,513.75 332,042.74 258,137.69 331,559.73 257,995.81 331,377.49 258,214.34 331,658.17 258,585.01 332,134.27 258,763.37 332,363.36 258,368.89 568,690.51
3 Asphalt Finisher Unit/Jam 190,065.98 901,740.31 189,873.89 900,828.95 189,597.69 899,518.54 189,493.48 899,024.13 189,653.98 899,785.61 189,926.23 901,077.27 190,057.23 901,698.80 189,767.50 1,074,274.54
4 Asphalt Liquid Mixer Unit/Jam 67,816.97 124,516.48 67,748.43 124,390.64 67,649.88 124,209.69 67,612.70 124,141.42 67,669.96 124,246.57 67,767.11 124,424.92 67,813.85 124,510.75 67,710.47 186,387.73
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 91,017.51 91,017.51 90,925.53 90,925.53 90,793.26 90,793.26 90,743.35 90,743.35 90,820.22 90,820.22 90,950.59 90,950.59 91,013.32 91,013.32 90,874.58 174,174.75
6 Asphalt Mixing Plant Unit/Jam 1,017,254.56 5,217,979.58 1,016,226.46 5,212,705.99 1,014,748.18 5,205,123.19 1,014,190.43 5,202,262.25 1,015,049.47 5,206,668.63 1,016,506.58 5,214,142.87 1,017,207.73 5,217,739.38 1,015,657.02 6,140,787.01
7 Asphalt Sprayer Unit/Jam 83,878.88 83,878.88 83,794.11 83,794.11 83,672.22 83,672.22 83,626.23 83,626.23 83,697.06 83,697.06 83,817.21 83,817.21 83,875.02 83,875.02 83,747.16 160,513.98
8 Asphalt Tanker Unit/Jam 392,624.57 454,886.81 392,227.76 454,427.08 391,657.19 453,766.03 391,441.92 453,516.63 391,773.48 453,900.76 392,335.87 454,552.34 392,606.49 454,865.87 392,007.97 813,506.52
9 Blending Equipment Unit/Jam 127,602.98 201,837.20 127,474.02 201,633.21 127,288.59 201,339.90 127,218.62 201,229.23 127,326.38 201,399.68 127,509.16 201,688.79 127,597.11 201,827.90 127,402.59 318,303.80
10 Bore Pile Machine Unit/Jam 351,577.45 611,536.58 351,222.13 610,918.52 350,711.21 610,029.83 350,518.45 609,694.54 350,815.34 610,210.96 351,318.94 611,086.92 351,561.27 611,508.43 351,025.32 932,343.53
11 Bore Pile Machine Dia 60 Unit/Jam 230,220.77 695,886.45 229,988.09 695,183.15 229,653.54 694,171.88 229,527.31 693,790.34 229,721.72 694,377.99 230,051.49 695,374.77 230,210.17 695,854.42 229,859.22 905,494.04
12 Bore Pile Machine Dia 80 Unit/Jam 910,175.13 910,175.13 909,255.25 909,255.25 907,932.58 907,932.58 907,433.55 907,433.55 908,202.15 908,202.15 909,505.89 909,505.89 910,133.23 910,133.23 908,745.76 1,741,747.48
13 Bulldozer 100-150 HP Unit/Jam 356,931.42 517,145.05 356,570.69 516,622.40 356,051.99 515,870.88 355,856.29 515,587.33 356,157.71 516,024.04 356,668.98 516,764.80 356,914.99 517,121.25 356,370.89 843,000.25
14 Cement Tanker Unit/Jam 331,946.22 428,778.52 331,610.74 428,345.17 331,128.35 427,722.07 330,946.35 427,486.97 331,226.67 427,849.06 331,702.15 428,463.24 331,930.94 428,758.78 331,424.92 731,905.78
15 Cold Milling Unit/Jam 518,442.89 1,103,577.50 517,918.92 1,102,462.16 517,165.52 1,100,858.44 516,881.26 1,100,253.36 517,319.07 1,101,185.29 518,061.69 1,102,766.06 518,419.03 1,103,526.70 517,628.71 1,576,328.72
16 Cold Recycler Unit/Jam 4,366,163.63 4,366,163.63 4,361,750.93 4,361,750.93 4,355,406.00 4,355,406.00 4,353,012.10 4,353,012.10 4,356,699.15 4,356,699.15 4,362,953.25 4,362,953.25 4,365,962.64 4,365,962.64 4,359,306.86 8,355,265.12
17 Compressor 4000-6500 L\M Unit/Jam 132,956.96 132,956.96 132,822.58 132,822.58 132,629.37 132,629.37 132,556.47 132,556.47 132,668.75 132,668.75 132,859.19 132,859.19 132,950.83 132,950.83 132,748.15 254,431.74
18 Concrete Breaker Unit/Jam 484,534.41 923,831.94 484,044.71 922,898.26 483,340.58 921,555.74 483,074.92 921,049.22 483,484.09 921,829.36 484,178.14 923,152.66 484,512.10 923,789.41 483,773.48 1,365,832.04
19 Concrete Mixer (350) Unit/Jam 90,125.18 90,125.18 90,034.10 90,034.10 89,903.13 89,903.13 89,853.71 89,853.71 89,929.82 89,929.82 90,058.92 90,058.92 90,121.04 90,121.04 89,983.65 172,467.15
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 102,617.78 102,617.78 102,514.07 102,514.07 102,364.95 102,364.95 102,308.68 102,308.68 102,395.34 102,395.34 102,542.33 102,542.33 102,613.06 102,613.06 102,456.63 196,373.49
21 Concrete Pan Mixer Unit/Jam 273,052.54 584,424.12 272,776.58 583,833.46 272,379.77 582,984.18 272,230.06 582,663.75 272,460.65 583,157.27 272,851.77 583,994.40 273,039.97 584,397.22 272,623.73 833,406.84
22 Concrete Pump Unit/Jam 207,912.55 222,924.66 207,702.43 222,699.36 207,400.29 222,375.41 207,286.29 222,253.18 207,461.86 222,441.43 207,759.68 222,760.75 207,902.98 222,914.40 207,586.04 412,858.30
23 Concrete Vibrator Unit/Jam 77,632.58 77,632.58 77,554.12 77,554.12 77,441.31 77,441.31 77,398.74 77,398.74 77,464.30 77,464.30 77,575.50 77,575.50 77,629.01 77,629.01 77,510.67 148,560.81
24 Crane 10-15 Ton Unit/Jam 278,406.51 278,406.51 278,125.14 278,125.14 277,720.55 277,720.55 277,567.91 277,567.91 277,803.01 277,803.01 278,201.80 278,201.80 278,393.69 278,393.69 277,969.29 532,769.82
25 Crane On Track 35 Ton Unit/Jam 231,113.10 438,820.17 230,879.52 438,376.67 230,543.67 437,738.98 230,416.95 437,498.38 230,612.12 437,868.95 230,943.16 438,497.51 231,102.46 438,799.97 230,750.15 649,648.14
26 Crane On Track 75-100 Ton Unit/Jam 363,177.72 550,282.50 362,810.67 549,726.36 362,282.90 548,926.68 362,083.78 548,624.97 362,390.47 549,089.66 362,910.68 549,877.89 363,161.00 550,257.17 362,607.38 881,802.34
27 Dump Truck 10 Ton Unit/Jam 343,546.49 369,532.78 343,199.29 369,159.30 342,700.04 368,622.30 342,511.68 368,419.69 342,801.79 368,731.74 343,293.89 369,261.06 343,530.68 369,515.77 343,006.98 683,369.77
28 Dump Truck 3-4 M3 Unit/Jam 187,389.00 189,787.21 187,199.61 189,595.40 186,927.30 189,319.60 186,824.55 189,215.55 186,982.80 189,375.81 187,251.21 189,647.67 187,380.37 189,778.48 187,094.72 360,989.52
29 Excavator 80-140 HP Unit/Jam 271,267.88 430,786.85 270,993.72 430,351.47 270,599.51 429,725.45 270,450.78 429,489.26 270,679.86 429,853.04 271,068.42 430,470.10 271,255.39 430,767.02 270,841.87 678,377.51
30 Flat Bed Truck 3-4 M3 Unit/Jam 329,269.24 439,824.34 328,936.46 439,379.82 328,457.96 438,740.67 328,277.43 438,499.52 328,555.48 438,870.93 329,027.13 439,500.94 329,254.08 439,804.09 328,752.14 740,484.24
31 Fulvi Mixer Unit/Jam 824,511.59 1,287,339.72 823,678.29 1,286,038.66 822,480.10 1,284,167.89 822,028.04 1,283,462.06 822,724.30 1,284,549.17 823,905.34 1,286,393.16 824,473.63 1,287,280.46 823,216.75 2,039,919.60
32 Generator Set Unit/Jam 366,747.04 388,611.91 366,376.38 388,219.16 365,843.42 387,654.43 365,642.34 387,441.36 365,952.04 387,769.52 366,477.37 388,326.17 366,730.15 388,594.02 366,171.09 723,652.32
33 Hot Recycler Unit/Jam 2,693,939.91 7,899,767.24 2,691,217.26 7,891,783.28 2,687,302.41 7,880,303.29 2,685,825.37 7,875,971.97 2,688,100.29 7,882,643.01 2,691,959.10 7,893,958.66 2,693,815.91 7,899,403.60 2,689,709.26 10,352,882.94
34 Jack Hammer Unit/Jam 50,862.73 50,862.73 50,811.32 50,811.32 50,737.41 50,737.41 50,709.52 50,709.52 50,752.47 50,752.47 50,825.33 50,825.33 50,860.39 50,860.39 50,782.85 97,332.95
35 Launching Gantry Unit/Jam 64,728,621.20 64,729,489.79 64,663,202.70 64,664,070.41 64,569,138.70 64,570,005.14 64,533,648.98 64,534,514.95 64,588,309.78 64,589,176.48 64,681,027.18 64,681,895.13 64,725,641.59 64,726,510.13 64,626,969.22 123,868,142.17
36 Motor Grader > 100 HP Unit/Jam 254,313.64 427,774.35 254,056.61 427,342.02 253,687.04 426,720.38 253,547.61 426,485.83 253,762.37 426,847.07 254,126.65 427,459.82 254,301.93 427,754.66 253,914.26 659,853.04
37 Pedestrian Roller Unit/Jam 83,878.88 84,349.87 83,794.11 84,264.62 83,672.22 84,142.05 83,626.23 84,095.80 83,697.06 84,167.03 83,817.21 84,287.85 83,875.02 84,345.99 83,747.16 160,984.23
38 Pile Driver + Hammer Unit/Jam 95,479.16 279,157.91 95,382.66 278,875.78 95,243.91 278,470.10 95,191.56 278,317.05 95,272.19 278,552.78 95,408.95 278,952.65 95,474.76 279,145.06 95,329.21 366,103.03
39 Rock Drill Breaker Unit/Jam 92,802.17 301,249.55 92,708.38 300,945.08 92,573.52 300,507.31 92,522.64 300,342.14 92,601.00 300,596.53 92,733.93 301,028.04 92,797.90 301,235.68 92,656.43 385,709.96
40 Split Form Paver Unit/Jam 196,312.28 196,816.37 196,113.88 196,617.46 195,828.60 196,331.44 195,720.96 196,223.53 195,886.74 196,389.73 196,167.94 196,671.65 196,303.25 196,807.31 196,003.99 376,174.32
41 Stone Crusher Unit/Jam 525,581.52 654,715.68 525,050.34 654,053.98 524,286.56 653,102.55 523,998.39 652,743.58 524,442.22 653,296.46 525,195.07 654,234.28 525,557.33 654,685.54 524,756.13 1,134,705.15
42 Tamper Unit/Jam 78,524.91 78,524.91 78,445.55 78,445.55 78,331.44 78,331.44 78,288.38 78,288.38 78,354.70 78,354.70 78,467.17 78,467.17 78,521.30 78,521.30 78,401.59 150,268.41
43 Tandem Roller 6-8 T Unit/Jam 379,239.64 442,836.83 378,856.36 442,389.27 378,305.24 441,745.74 378,097.31 441,502.94 378,417.56 441,876.90 378,960.79 442,511.22 379,222.18 442,816.45 378,644.07 789,225.44
44 Three Wheel Roller 6-8 T Unit/Jam 125,818.33 158,658.09 125,691.17 158,497.74 125,508.33 158,267.18 125,439.34 158,180.19 125,545.59 158,314.17 125,725.81 158,541.43 125,812.53 158,650.79 125,620.74 273,559.17
45 Tire Roller 8-10 T Unit/Jam 224,866.80 405,682.72 224,639.53 405,272.71 224,312.76 404,683.17 224,189.46 404,460.74 224,379.36 404,803.33 224,701.46 405,384.43 224,856.45 405,664.05 224,513.66 610,846.05
46 Track Loader 75-100 HP Unit/Jam 210,589.54 277,149.58 210,376.71 276,869.48 210,070.68 276,466.72 209,955.21 276,314.77 210,133.05 276,548.81 210,434.70 276,945.80 210,579.85 277,136.82 210,258.82 469,448.07
47 Trailer 20 Ton Unit/Jam 339,977.18 469,949.29 339,633.58 469,474.33 339,139.52 468,791.40 338,953.12 468,533.73 339,240.22 468,930.59 339,727.20 469,603.74 339,961.53 469,927.66 339,443.27 780,361.91
48 Trailler 15 Ton Unit/Jam 294,468.42 447,857.66 294,170.82 447,405.03 293,742.89 446,754.20 293,581.44 446,508.64 293,830.11 446,886.84 294,251.91 447,528.35 294,454.87 447,837.04 294,005.98 716,654.88
49 Truck Mixer (agitator) Unit/Jam 370,316.35 544,257.51 369,942.09 543,707.45 369,403.94 542,916.54 369,200.90 542,618.13 369,513.62 543,077.73 370,044.06 543,857.33 370,299.30 544,232.46 369,734.79 882,320.16
50 Vibrating Rammer Unit/Jam 75,847.93 75,847.93 75,771.27 75,771.27 75,661.05 75,661.05 75,619.46 75,619.46 75,683.51 75,683.51 75,792.16 75,792.16 75,844.44 75,844.44 75,728.81 145,145.62
51 Vibratory Roller 5-8 T Unit/Jam 182,927.35 392,628.57 182,742.48 392,231.76 182,476.65 391,661.19 182,376.35 391,445.92 182,530.82 391,777.48 182,792.85 392,339.88 182,918.93 392,610.50 182,640.08 559,428.99
52 Water Pump 70-100 MM Unit/Jam 57,109.03 57,109.03 57,051.31 57,051.31 56,968.32 56,968.32 56,937.01 56,937.01 56,985.23 56,985.23 57,067.04 57,067.04 57,106.40 57,106.40 57,019.34 109,286.12
53 Water Tanker 3000-4500 L Unit/Jam 207,020.23 207,020.23 206,811.00 206,811.00 206,510.16 206,510.16 206,396.65 206,396.65 206,571.47 206,571.47 206,868.01 206,868.01 207,010.70 207,010.70 206,695.11 396,162.17
54 Welding Set Unit/Jam 116,002.71 116,002.71 115,885.47 115,885.47 115,716.90 115,716.90 115,653.30 115,653.30 115,751.25 115,751.25 115,917.42 115,917.42 115,997.37 115,997.37 115,820.54 221,987.42
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 201,666.25 321,332.85 201,462.44 321,008.09 201,169.38 320,541.13 201,058.81 320,364.95 201,229.10 320,636.30 201,517.97 321,096.58 201,656.97 321,318.06 201,349.55 505,395.26
HARGA SATUAN DASAR BAHAN KABUPATEN PASURUAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 281,166.24 281,166.24 280,882.08 280,882.08 280,473.49 280,473.49 280,319.33 280,319.33 280,556.76 280,556.76 280,959.50 280,959.50 281,153.30 281,153.30 280,724.69 538,050.95
2 Agregat Pecah Mesin 20-30 mm M3 268,112.10 268,112.10 267,841.13 267,841.13 267,451.50 267,451.50 267,304.50 267,304.50 267,530.91 267,530.91 267,914.96 267,914.96 268,099.75 268,099.75 267,691.04 513,070.01
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 307,274.54 307,274.54 306,963.99 306,963.99 306,517.45 306,517.45 306,348.98 306,348.98 306,608.46 306,608.46 307,048.60 307,048.60 307,260.39 307,260.39 306,791.98 588,012.83
4 Bahan Agr. Base Kelas A M3 294,220.39 294,220.39 293,923.03 293,923.03 293,495.47 293,495.47 293,334.15 293,334.15 293,582.61 293,582.61 294,004.05 294,004.05 294,206.85 294,206.85 293,758.34 563,031.89
5 Bahan Agr. Base Kelas B M3 276,145.42 276,145.42 275,866.33 275,866.33 275,465.03 275,465.03 275,313.63 275,313.63 275,546.82 275,546.82 275,942.37 275,942.37 276,132.70 276,132.70 275,711.75 528,442.90
6 Bahan Agr. Base Kelas C M3 254,053.78 254,053.78 253,797.02 253,797.02 253,427.83 253,427.83 253,288.54 253,288.54 253,503.07 253,503.07 253,866.98 253,866.98 254,042.09 254,042.09 253,654.81 486,167.47
7 Bahan Agr. Base Kelas C2 M3 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
8 Bahan Agr. Base Kelas S M3 187,778.88 187,778.88 187,589.10 187,589.10 187,316.22 187,316.22 187,213.27 187,213.27 187,371.84 187,371.84 187,640.81 187,640.81 187,770.24 187,770.24 187,483.99 359,341.17
9 Bahan Pilihan M3 187,778.88 187,778.88 187,589.10 187,589.10 187,316.22 187,316.22 187,213.27 187,213.27 187,371.84 187,371.84 187,640.81 187,640.81 187,770.24 187,770.24 187,483.99 359,341.17
10 Bahan Tanah Timbunan M3 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 205,612.33
11 Batu Belah/Kerakal M3 312,295.36 312,295.36 311,979.74 311,979.74 311,525.91 311,525.91 311,354.68 311,354.68 311,618.40 311,618.40 312,065.74 312,065.74 312,280.99 312,280.99 311,804.92 597,620.88
12 Batu Kali M3 312,295.36 312,295.36 311,979.74 311,979.74 311,525.91 311,525.91 311,354.68 311,354.68 311,618.40 311,618.40 312,065.74 312,065.74 312,280.99 312,280.99 311,804.92 597,620.88
13 Chipping M3 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
14 Chipping (kg) Kg 271.12 271.12 270.85 270.85 270.46 270.46 270.31 270.31 270.54 270.54 270.93 270.93 271.11 271.11 270.70 518.83
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 356,478.63 356,478.63 356,118.35 356,118.35 355,600.31 355,600.31 355,404.86 355,404.86 355,705.89 355,705.89 356,216.51 356,216.51 356,462.22 356,462.22 355,918.80 682,171.74
18 Kapur M3 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
19 Pasir Beton (Kasar) M3 222,924.66 222,924.66 222,699.36 222,699.36 222,375.41 222,375.41 222,253.18 222,253.18 222,441.43 222,441.43 222,760.75 222,760.75 222,914.40 222,914.40 222,574.58 426,597.54
20 Pasir Halus (untuk HRS) M3 268,112.10 268,112.10 267,841.13 267,841.13 267,451.50 267,451.50 267,304.50 267,304.50 267,530.91 267,530.91 267,914.96 267,914.96 268,099.75 268,099.75 267,691.04 513,070.01
21 Pasir Pasang (Sedang) M3 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
22 Pasir Urug M3 181,753.89 181,753.89 181,570.20 181,570.20 181,306.08 181,306.08 181,206.42 181,206.42 181,359.91 181,359.91 181,620.25 181,620.25 181,745.53 181,745.53 181,468.46 347,811.51
23 Pasir Urug (ada unsur lempung) M3 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 272,868.70
24 Sirtu M3 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
26 Anti Pengelupas Liter 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
27 Arbocell Kg 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 242,122.93
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
40 Beton B-0 M3 526,473.85 526,473.85 525,941.76 525,941.76 525,176.69 525,176.69 524,888.03 524,888.03 525,332.62 525,332.62 526,086.74 526,086.74 526,449.61 526,449.61 525,647.06 1,007,481.39
41 Beton K-125 (fc' 10 MPa) M3 544,320.42 544,320.42 543,770.30 543,770.30 542,979.29 542,979.29 542,680.85 542,680.85 543,140.50 543,140.50 543,920.19 543,920.19 544,295.36 544,295.36 543,465.60 1,041,633.30
42 Beton K-175 (fc' 15 MPa) M3 588,936.85 588,936.85 588,341.63 588,341.63 587,485.79 587,485.79 587,162.88 587,162.88 587,660.22 587,660.22 588,503.81 588,503.81 588,909.74 588,909.74 588,011.96 1,127,013.08
43 Beton K-250 (fc' 20 MPa) M3 655,861.49 655,861.49 655,198.64 655,198.64 654,245.54 654,245.54 653,885.94 653,885.94 654,439.79 654,439.79 655,379.24 655,379.24 655,831.30 655,831.30 654,831.50 1,255,082.74
44 Beton K-300 (fc' 25 MPa) M3 682,631.35 682,631.35 681,941.44 681,941.44 680,949.44 680,949.44 680,575.16 680,575.16 681,151.61 681,151.61 682,129.42 682,129.42 682,599.92 682,599.92 681,559.32 1,306,310.61
45 Beton K-350 (fc' 30 MPa) M3 709,401.20 709,401.20 708,684.24 708,684.24 707,653.33 707,653.33 707,264.38 707,264.38 707,863.44 707,863.44 708,879.59 708,879.59 709,368.55 709,368.55 708,287.14 1,357,538.48
46 Beton K-400 (fc' 35 MPa) M3 736,171.06 736,171.06 735,427.04 735,427.04 734,357.23 734,357.23 733,953.60 733,953.60 734,575.27 734,575.27 735,629.76 735,629.76 736,137.17 736,137.17 735,014.95 1,408,766.34
47 Beton K-450 (fc' 40 MPa) M3 771,864.20 771,864.20 771,084.11 771,084.11 769,962.43 769,962.43 769,539.23 769,539.23 770,191.04 770,191.04 771,296.66 771,296.66 771,828.67 771,828.67 770,652.04 1,477,070.17
48 Beton K-500 (fc' 45 MPa) M3 803,095.70 803,095.70 802,284.05 802,284.05 801,116.98 801,116.98 800,676.66 800,676.66 801,354.84 801,354.84 802,505.20 802,505.20 803,058.73 803,058.73 801,834.49 1,536,836.01
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 76,316.55 76,316.55 76,239.42 76,239.42 76,128.52 76,128.52 76,086.67 76,086.67 76,151.12 76,151.12 76,260.44 76,260.44 76,313.04 76,313.04 76,196.70 146,042.40
51 Cat Anti Karat Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
52 Cat Marka (Non Thermoplas) Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
53 Cat Marka (Thermoplastic) Kg 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
54 Cerucuk Diameter 10-15 cm M' 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,164,831.57 1,164,831.57 1,163,654.33 1,163,654.33 1,161,961.59 1,161,961.59 1,161,322.93 1,161,322.93 1,162,306.58 1,162,306.58 1,163,975.09 1,163,975.09 1,164,777.95 1,164,777.95 1,163,002.28 2,229,068.23
57 Curing Compound Liter 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 544,257.51 544,257.51 543,707.45 543,707.45 542,916.54 542,916.54 542,618.13 542,618.13 543,077.73 543,077.73 543,857.33 543,857.33 544,232.46 544,232.46 543,402.79 1,041,512.91
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 633,628.21 633,628.21 632,987.83 632,987.83 632,067.04 632,067.04 631,719.63 631,719.63 632,254.70 632,254.70 633,162.31 633,162.31 633,599.04 633,599.04 632,633.14 1,212,536.25
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 803,332.12 803,332.12 802,520.23 802,520.23 801,352.82 801,352.82 800,912.36 800,912.36 801,590.75 801,590.75 802,741.44 802,741.44 803,295.14 803,295.14 802,070.54 1,537,288.43
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
64 Oxygen (Isi 6 M3) Botol 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
65 Polytene 125 Mikron Kg 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
66 Sand Sheet Ton 1,231,106.47 1,231,106.47 1,229,862.25 1,229,862.25 1,228,073.20 1,228,073.20 1,227,398.20 1,227,398.20 1,228,437.82 1,228,437.82 1,230,201.26 1,230,201.26 1,231,049.80 1,231,049.80 1,229,173.10 2,355,894.52
67 Seal Coat M2 98,408.18 98,408.18 98,308.73 98,308.73 98,165.72 98,165.72 98,111.76 98,111.76 98,194.87 98,194.87 98,335.83 98,335.83 98,403.65 98,403.65 98,253.64 188,317.83
68 Seal Guard Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
69 Semen/PC (50 kg) Zak 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,600,115.82 11,600,115.82 11,588,392.07 11,588,392.07 11,571,534.72 11,571,534.72 11,565,174.55 11,565,174.55 11,574,970.40 11,574,970.40 11,591,586.42 11,591,586.42 11,599,581.84 11,599,581.84 11,581,898.61 22,198,444.97
87 Box Culvert Type DUB 200×200 M' 12,314,077.24 12,314,077.24 12,301,631.92 12,301,631.92 12,283,737.04 12,283,737.04 12,276,985.41 12,276,985.41 12,287,384.17 12,287,384.17 12,305,022.88 12,305,022.88 12,313,510.40 12,313,510.40 12,294,738.81 23,564,710.07
88 Box Culvert Type uk 300×200 M' 13,296,150.76 13,296,150.76 13,282,712.90 13,282,712.90 13,263,390.86 13,263,390.86 13,256,100.78 13,256,100.78 13,267,328.86 13,267,328.86 13,286,374.29 13,286,374.29 13,295,538.71 13,295,538.71 13,275,270.04 25,444,045.18
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 172,716.41 172,716.41 172,541.85 172,541.85 172,290.86 172,290.86 172,196.16 172,196.16 172,342.01 172,342.01 172,589.41 172,589.41 172,708.46 172,708.46 172,445.17 330,517.01
91 Ducting (Strand Prestress) M' 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 1,942,055.40 1,942,055.40 1,940,092.65 1,940,092.65 1,937,270.44 1,937,270.44 1,936,205.64 1,936,205.64 1,937,845.63 1,937,845.63 1,940,627.44 1,940,627.44 1,941,966.00 1,941,966.00 1,939,005.53 3,716,394.79
94 Expansion Join Tipe Rubber M' 1,405,831.21 1,405,831.21 1,404,410.40 1,404,410.40 1,402,367.43 1,402,367.43 1,401,596.64 1,401,596.64 1,402,783.81 1,402,783.81 1,404,797.52 1,404,797.52 1,405,766.50 1,405,766.50 1,403,623.45 2,690,254.76
95 Expansion Join Tipe Torma M' 1,612,689.23 1,612,689.23 1,611,059.35 1,611,059.35 1,608,715.79 1,608,715.79 1,607,831.57 1,607,831.57 1,609,193.43 1,609,193.43 1,611,503.45 1,611,503.45 1,612,615.00 1,612,615.00 1,610,156.61 3,086,106.53
96 Expansion Tipe Joint Asphaltic Plug M' 1,912,934.61 1,912,934.61 1,911,001.29 1,911,001.29 1,908,221.40 1,908,221.40 1,907,172.57 1,907,172.57 1,908,787.97 1,908,787.97 1,911,528.06 1,911,528.06 1,912,846.56 1,912,846.56 1,909,930.48 3,660,668.08
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
99 Glass Bead Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
100 Joint Sealent Kg 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
101 Joint Socket Pile 16×16×16 Set 81,337.38 81,337.38 81,255.17 81,255.17 81,136.97 81,136.97 81,092.38 81,092.38 81,161.06 81,161.06 81,277.57 81,277.57 81,333.63 81,333.63 81,209.64 155,650.45
102 Joint Socket Pile 35×35 Set 697,894.78 697,894.78 697,189.45 697,189.45 696,175.26 696,175.26 695,792.62 695,792.62 696,381.96 696,381.96 697,381.63 697,381.63 697,862.65 697,862.65 696,798.78 1,335,519.33
103 Kawat Beton Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
104 Kawat Bronjong Kg 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21 27,069.88 51,883.48
105 Kawat Las Dos 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
106 Kayu Acuan (Kelas III/Meranti) M3 3,836,915.04 3,836,915.04 3,833,037.23 3,833,037.23 3,827,461.41 3,827,461.41 3,825,357.68 3,825,357.68 3,828,597.81 3,828,597.81 3,834,093.81 3,834,093.81 3,836,738.42 3,836,738.42 3,830,889.42 7,342,473.88
107 Kayu Perancah (Gelam) M3 2,471,250.44 2,471,250.44 2,468,752.85 2,468,752.85 2,465,161.61 2,465,161.61 2,463,806.66 2,463,806.66 2,465,893.54 2,465,893.54 2,469,433.36 2,469,433.36 2,471,136.68 2,471,136.68 2,467,369.50 4,729,083.54
108 Kerb Pracetak Type 1 (Peninggi) Buah 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
110 Marmer Nama Jembatan Buah 535,220.03 535,220.03 534,679.10 534,679.10 533,901.32 533,901.32 533,607.86 533,607.86 534,059.84 534,059.84 534,826.49 534,826.49 535,195.39 535,195.39 534,379.50 1,024,218.42
111 Mata Kucing Buah 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
112 Matras Concrete (Tebal=10 cm) M2 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
113 Mini Pile 16×16×16 M' 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 232,514.88
114 Mini Timber Pile Buah 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
115 Multipleks 12 mm Lbr 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
116 Paku Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
117 Paving Block (Model Bata 8 cm) M2 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 59,320,052.12 59,320,052.12 59,260,099.83 59,260,099.83 59,173,895.59 59,173,895.59 59,141,371.31 59,141,371.31 59,191,464.78 59,191,464.78 59,276,434.94 59,276,434.94 59,317,321.47 59,317,321.47 59,226,893.94 113,517,221.12
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 84,037,577.31 84,037,577.31 83,952,644.06 83,952,644.06 83,830,520.17 83,830,520.17 83,784,443.64 83,784,443.64 83,855,410.10 83,855,410.10 83,975,785.69 83,975,785.69 84,033,708.85 84,033,708.85 83,905,601.90 160,817,664.60
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 160,619,228.37 160,619,228.37 160,456,897.26 160,456,897.26 160,223,484.48 160,223,484.48 160,135,419.39 160,135,419.39 160,271,056.07 160,271,056.07 160,501,127.37 160,501,127.37 160,611,834.68 160,611,834.68 160,366,986.59 307,367,370.92
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 210,626,652.88 210,626,652.88 210,413,781.37 210,413,781.37 210,107,697.51 210,107,697.51 209,992,214.11 209,992,214.11 210,170,080.12 210,170,080.12 210,471,782.15 210,471,782.15 210,616,957.23 210,616,957.23 210,295,877.78 403,063,575.88
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 268,493,678.02 268,493,678.02 268,222,322.74 268,222,322.74 267,832,146.19 267,832,146.19 267,684,935.18 267,684,935.18 267,911,667.63 267,911,667.63 268,296,258.51 268,296,258.51 268,481,318.62 268,481,318.62 268,072,026.62 513,800,226.55
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 323,936,648.49 323,936,648.49 323,609,259.33 323,609,259.33 323,138,512.74 323,138,512.74 322,960,903.19 322,960,903.19 323,234,455.07 323,234,455.07 323,698,462.57 323,698,462.57 323,921,736.91 323,921,736.91 323,427,927.61 619,898,109.37
124 Pelat Rambu (Eng. Grade) Buah 187,778.88 187,778.88 187,589.10 187,589.10 187,316.22 187,316.22 187,213.27 187,213.27 187,371.84 187,371.84 187,640.81 187,640.81 187,770.24 187,770.24 187,483.99 359,341.17
125 Pelat Rambu (High L Grade) Buah 218,908.00 218,908.00 218,686.76 218,686.76 218,368.64 218,368.64 218,248.62 218,248.62 218,433.48 218,433.48 218,747.04 218,747.04 218,897.93 218,897.93 218,564.22 418,911.10
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
128 Pipa Drainase Baja Dia 3" M' 246,020.46 246,020.46 245,771.82 245,771.82 245,414.30 245,414.30 245,279.41 245,279.41 245,487.17 245,487.17 245,839.57 245,839.57 246,009.14 246,009.14 245,634.10 470,794.58
129 Pipa Galvanis Dia 1,5" M' 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 176,788.17
130 Pipa Galvanis Dia 2" M' 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 242,122.93
131 Pipa Galvanis Dia 3" M' 214,891.34 214,891.34 214,674.16 214,674.16 214,361.88 214,361.88 214,244.06 214,244.06 214,425.52 214,425.52 214,733.34 214,733.34 214,881.45 214,881.45 214,553.87 411,224.66
132 Pipa Porus M' 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 203,690.72
133 Pipa PVC Dia 4" M' 104,433.18 104,433.18 104,327.63 104,327.63 104,175.87 104,175.87 104,118.61 104,118.61 104,206.80 104,206.80 104,356.39 104,356.39 104,428.37 104,428.37 104,269.17 199,847.50
134 Plastik Filter M2 32,123.83 32,123.83 32,091.36 32,091.36 32,044.68 32,044.68 32,027.07 32,027.07 32,054.19 32,054.19 32,100.21 32,100.21 32,122.35 32,122.35 32,073.38 61,473.44
135 Rel Pengaman M' 151,695.85 151,695.85 151,542.54 151,542.54 151,322.10 151,322.10 151,238.92 151,238.92 151,367.03 151,367.03 151,584.31 151,584.31 151,688.87 151,688.87 151,457.63 290,291.25
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,832,842.86 1,832,842.86 1,830,990.48 1,830,990.48 1,828,326.98 1,828,326.98 1,827,322.06 1,827,322.06 1,828,869.83 1,828,869.83 1,831,495.19 1,831,495.19 1,832,758.49 1,832,758.49 1,829,964.50 3,507,401.30
137 Strip Bearing Buah 281,083.50 281,083.50 280,799.42 280,799.42 280,390.94 280,390.94 280,236.83 280,236.83 280,474.19 280,474.19 280,876.82 280,876.82 281,070.56 281,070.56 280,642.07 537,892.60
138 Tiang Pancang Baja Diameter 400 M' 615,553.24 615,553.24 614,931.12 614,931.12 614,036.60 614,036.60 613,699.10 613,699.10 614,218.91 614,218.91 615,100.63 615,100.63 615,524.90 615,524.90 614,586.55 1,177,947.26
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 789,273.81 789,273.81 788,476.12 788,476.12 787,329.15 787,329.15 786,896.40 786,896.40 787,562.91 787,562.91 788,693.47 788,693.47 789,237.48 789,237.48 788,034.31 1,510,385.89
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,606,664.24 1,606,664.24 1,605,040.45 1,605,040.45 1,602,705.64 1,602,705.64 1,601,824.73 1,601,824.73 1,603,181.50 1,603,181.50 1,605,482.88 1,605,482.88 1,606,590.28 1,606,590.28 1,604,141.08 3,074,576.87
HARGA SATUAN DASAR UPAH KABUPATEN MALANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 108,000 108,000 108,292.21 108,292.21 108,441.50 108,441.50 108,444.52 108,444.52 108,301.29 108,301.29 108,146.59 108,146.59 108,123.18 108,123.18 108,250.11 108,250.11 108,407.54 108,407.54
2 Tukang OH 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
3 Mandor OH 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
4 Operator OH 288,000 288,000 288,779.23 288,779.23 289,177.34 289,177.34 289,185.39 289,185.39 288,803.44 288,803.44 288,390.91 288,390.91 288,328.48 288,328.48 288,666.96 288,666.96 289,086.78 289,086.78
5 Pembantu Operator OH 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
6 Sopir OH 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
7 Pembantu Sopir OH 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
8 Mekanik OH 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
9 Pembantu Mekanik OH 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
10 Kepala Tukang OH 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
11 Pemasak Aspal OH 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43

HARGA SATUAN DASAR ALAT KABUPATEN MALANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 424,618 474,000 425,767.25 475,282.48 426,354.21 475,937.70 426,366.08 475,950.95 425,802.96 475,322.34 425,194.74 474,643.38 425,102.69 474,540.63 425,601.73 475,097.71 426,220.70 475,788.66
2 Asphalt Distribution Unit/Jam 261,442 336,000 262,149.69 336,909.10 262,511.09 337,373.56 262,518.39 337,382.95 262,171.67 336,937.35 261,797.18 336,456.07 261,740.51 336,383.23 262,047.78 336,778.12 262,428.88 337,267.91
3 Asphalt Finisher Unit/Jam 192,025 911,000 192,544.43 913,464.85 192,809.87 914,724.14 192,815.23 914,749.61 192,560.57 913,541.45 192,285.52 912,236.54 192,243.89 912,039.06 192,469.57 913,109.73 192,749.49 914,437.70
4 Asphalt Liquid Mixer Unit/Jam 68,516 125,000 68,701.30 125,338.21 68,796.01 125,511.00 68,797.92 125,514.49 68,707.06 125,348.72 68,608.92 125,169.67 68,594.07 125,142.57 68,674.59 125,289.48 68,774.47 125,471.69
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 91,956 91,956 92,204.37 92,204.37 92,331.49 92,331.49 92,334.06 92,334.06 92,212.11 92,212.11 92,080.39 92,080.39 92,060.46 92,060.46 92,168.53 92,168.53 92,302.57 92,302.57
6 Asphalt Mixing Plant Unit/Jam 1,027,739 5,852,531 1,030,519.47 5,868,365.92 1,031,940.13 5,876,455.98 1,031,968.86 5,876,619.57 1,030,605.89 5,868,858.03 1,029,133.76 5,860,474.88 1,028,910.98 5,859,206.24 1,030,118.84 5,866,084.52 1,031,616.99 5,874,615.80
7 Asphalt Sprayer Unit/Jam 84,743 84,743 84,972.66 84,972.66 85,089.80 85,089.80 85,092.17 85,092.17 84,979.78 84,979.78 84,858.40 84,858.40 84,840.03 84,840.03 84,939.62 84,939.62 85,063.16 85,063.16
8 Asphalt Tanker Unit/Jam 396,671 460,000 397,744.36 461,244.60 398,292.68 461,880.47 398,303.77 461,893.32 397,777.71 461,283.28 397,209.52 460,624.38 397,123.53 460,524.66 397,589.73 461,065.29 398,167.96 461,735.83
9 Blending Equipment Unit/Jam 128,918 204,000 129,266.92 204,551.95 129,445.12 204,833.95 129,448.73 204,839.65 129,277.76 204,569.11 129,093.09 204,276.90 129,065.15 204,232.68 129,216.66 204,472.43 129,404.59 204,769.80
10 Bore Pile Machine Unit/Jam 355,201 618,000 356,161.99 619,672.09 356,652.99 620,526.37 356,662.92 620,543.64 356,191.86 619,724.06 355,683.07 618,838.84 355,606.07 618,704.87 356,023.53 619,431.19 356,541.31 620,332.05
11 Bore Pile Machine Dia 60 Unit/Jam 232,594 703,000 233,222.83 704,902.07 233,544.35 705,873.84 233,550.85 705,893.49 233,242.39 704,961.19 232,909.22 703,954.21 232,858.80 703,801.82 233,132.16 704,628.04 233,471.21 705,652.80
12 Bore Pile Machine Dia 80 Unit/Jam 919,556 919,556 922,043.74 922,043.74 923,314.86 923,314.86 923,340.56 923,340.56 922,121.06 922,121.06 920,803.89 920,803.89 920,604.56 920,604.56 921,685.28 921,685.28 923,025.72 923,025.72
13 Bulldozer 100-150 HP Unit/Jam 360,610 523,000 361,585.78 524,415.06 362,084.26 525,138.01 362,094.34 525,152.63 361,616.10 524,459.03 361,099.56 523,709.89 361,021.40 523,596.52 361,445.21 524,211.18 361,970.87 524,973.57
14 Cement Tanker Unit/Jam 335,367 433,000 336,274.77 434,171.55 336,738.36 434,770.09 336,747.73 434,782.19 336,302.97 434,207.96 335,822.59 433,587.73 335,749.90 433,493.87 336,144.04 434,002.76 336,632.91 434,633.95
15 Cold Milling Unit/Jam 523,786 1,394,561 525,203.34 1,398,334.20 525,927.38 1,400,261.93 525,942.02 1,400,300.91 525,247.39 1,398,451.46 524,497.12 1,396,453.89 524,383.58 1,396,151.60 524,999.16 1,397,790.58 525,762.69 1,399,823.44
16 Cold Recycler Unit/Jam 4,411,163 4,411,163 4,423,098.04 4,423,098.04 4,429,195.67 4,429,195.67 4,429,318.97 4,429,318.97 4,423,468.96 4,423,468.96 4,417,150.42 4,417,150.42 4,416,194.22 4,416,194.22 4,421,378.51 4,421,378.51 4,427,808.70 4,427,808.70
17 Compressor 4000-6500 L\M Unit/Jam 134,327 156,034 134,690.70 156,456.17 134,876.39 156,671.86 134,880.14 156,676.22 134,702.00 156,469.29 134,509.59 156,245.79 134,480.47 156,211.97 134,638.34 156,395.35 134,834.15 156,622.80
18 Concrete Breaker Unit/Jam 489,528 933,000 490,852.70 935,524.37 491,529.38 936,814.08 491,543.06 936,840.16 490,893.86 935,602.83 490,192.66 934,266.40 490,086.54 934,064.15 490,661.87 935,160.68 491,375.46 936,520.72
19 Concrete Mixer (350) Unit/Jam 91,054 91,054 91,300.41 91,300.41 91,426.27 91,426.27 91,428.82 91,428.82 91,308.07 91,308.07 91,177.64 91,177.64 91,157.90 91,157.90 91,264.92 91,264.92 91,397.65 91,397.65
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 103,675 103,675 103,955.91 103,955.91 104,099.22 104,099.22 104,102.12 104,102.12 103,964.63 103,964.63 103,816.12 103,816.12 103,793.65 103,793.65 103,915.50 103,915.50 104,066.63 104,066.63
21 Concrete Pan Mixer Unit/Jam 275,867 590,000 276,613.12 591,596.34 276,994.46 592,411.90 277,002.17 592,428.39 276,636.32 591,645.95 276,241.17 590,800.83 276,181.37 590,672.94 276,505.58 591,366.35 276,907.72 592,226.39
22 Concrete Pump Unit/Jam 210,055 246,534 210,623.72 247,201.04 210,914.08 247,541.82 210,919.95 247,548.71 210,641.38 247,221.77 210,340.50 246,868.63 210,294.96 246,815.19 210,541.83 247,104.93 210,848.03 247,464.31
23 Concrete Vibrator Unit/Jam 78,433 78,433 78,644.91 78,644.91 78,753.33 78,753.33 78,755.52 78,755.52 78,651.50 78,651.50 78,539.16 78,539.16 78,522.15 78,522.15 78,614.33 78,614.33 78,728.66 78,728.66
24 Crane 10-15 Ton Unit/Jam 281,276 383,246 282,036.91 384,282.93 282,425.72 384,812.70 282,433.58 384,823.41 282,060.56 384,315.16 281,657.66 383,766.20 281,596.69 383,683.12 281,927.26 384,133.54 282,337.28 384,692.20
25 Crane On Track 35 Ton Unit/Jam 233,495 445,479 234,126.79 446,684.31 234,449.56 447,300.11 234,456.08 447,312.56 234,146.43 446,721.77 233,811.97 446,083.67 233,761.35 445,987.10 234,035.77 446,510.66 234,376.14 447,160.04
26 Crane On Track 75-100 Ton Unit/Jam 366,921 556,000 367,913.53 557,504.34 368,420.73 558,272.91 368,430.99 558,288.45 367,944.38 557,551.09 367,418.81 556,754.68 367,339.27 556,634.16 367,770.50 557,287.61 368,305.36 558,098.09
27 Dump Truck 10 Ton Unit/Jam 347,087 352,318 348,026.31 353,271.25 348,506.10 353,758.27 348,515.80 353,768.11 348,055.50 353,300.88 347,558.33 352,796.22 347,483.09 352,719.84 347,891.01 353,133.91 348,396.96 353,647.49
28 Dump Truck 3-4 M3 Unit/Jam 189,320 259,436 189,832.53 260,137.94 190,094.23 260,496.57 190,099.53 260,503.82 189,848.45 260,159.76 189,577.27 259,788.14 189,536.23 259,731.91 189,758.73 260,036.81 190,034.71 260,414.99
29 Excavator 80-140 HP Unit/Jam 274,064 452,952 274,805.19 454,177.53 275,184.04 454,803.65 275,191.70 454,816.32 274,828.24 454,215.62 274,435.67 453,566.81 274,376.26 453,468.62 274,698.36 454,000.96 275,097.86 454,661.24
30 Flat Bed Truck 3-4 M3 Unit/Jam 332,663 444,000 333,562.88 445,201.31 334,022.73 445,815.06 334,032.03 445,827.47 333,590.85 445,238.64 333,114.35 444,602.66 333,042.24 444,506.41 333,433.20 445,028.23 333,918.13 445,675.45
31 Fulvi Mixer Unit/Jam 833,009 1,301,000 835,263.15 1,304,520.05 836,414.63 1,306,318.45 836,437.92 1,306,354.82 835,333.19 1,304,629.45 834,139.99 1,302,765.90 833,959.42 1,302,483.88 834,938.43 1,304,012.91 836,152.72 1,305,909.38
32 Generator Set Unit/Jam 370,527 548,001 371,529.39 549,483.70 372,041.57 550,241.21 372,051.93 550,256.53 371,560.54 549,529.78 371,029.80 548,744.82 370,949.48 548,626.03 371,384.95 549,270.08 371,925.07 550,068.91
33 Hot Recycler Unit/Jam 2,721,705 7,981,000 2,729,068.67 8,002,593.82 2,732,830.93 8,013,626.10 2,732,907.01 8,013,849.18 2,729,297.52 8,003,264.90 2,725,398.96 7,991,832.94 2,724,808.98 7,990,102.91 2,728,007.71 7,999,482.71 2,731,975.16 8,011,116.68
34 Jack Hammer Unit/Jam 51,387 52,000 51,525.97 52,140.69 51,597.01 52,212.57 51,598.44 52,214.03 51,530.29 52,145.07 51,456.69 52,070.58 51,445.55 52,059.31 51,505.94 52,120.42 51,580.85 52,196.22
35 Launching Gantry Unit/Jam 65,395,739 65,395,739 65,572,677.06 65,572,677.06 65,663,074.80 65,663,074.80 65,664,902.70 65,664,902.70 65,578,175.89 65,578,175.89 65,484,503.17 65,484,503.17 65,470,327.44 65,470,327.44 65,547,184.90 65,547,184.90 65,642,512.77 65,642,512.77
36 Motor Grader > 100 HP Unit/Jam 256,935 526,012 257,629.87 527,435.21 257,985.03 528,162.32 257,992.21 528,177.02 257,651.47 527,479.44 257,283.44 526,725.98 257,227.74 526,611.95 257,529.71 527,230.16 257,904.25 527,996.93
37 Pedestrian Roller Unit/Jam 84,743 84,743 84,972.66 84,972.66 85,089.80 85,089.80 85,092.17 85,092.17 84,979.78 84,979.78 84,858.40 84,858.40 84,840.03 84,840.03 84,939.62 84,939.62 85,063.16 85,063.16
38 Pile Driver + Hammer Unit/Jam 96,463 282,000 96,724.20 282,762.99 96,857.54 283,152.81 96,860.24 283,160.69 96,732.31 282,786.71 96,594.13 282,382.77 96,573.22 282,321.64 96,686.59 282,653.07 96,827.21 283,064.14
39 Rock Drill Breaker Unit/Jam 93,759 305,000 94,012.30 305,825.22 94,141.91 306,246.83 94,144.53 306,255.36 94,020.19 305,850.87 93,885.89 305,413.99 93,865.56 305,347.87 93,975.75 305,706.33 94,112.43 306,150.93
40 Split Form Paver Unit/Jam 198,336 198,336 198,872.18 198,872.18 199,146.34 199,146.34 199,151.89 199,151.89 198,888.86 198,888.86 198,604.76 198,604.76 198,561.77 198,561.77 198,794.86 198,794.86 199,083.98 199,083.98
41 Stone Crusher Unit/Jam 530,998 719,345 532,435.06 721,291.30 533,169.07 722,285.66 533,183.91 722,305.77 532,479.71 721,351.78 531,719.11 720,321.40 531,604.00 720,165.47 532,228.07 721,010.89 533,002.11 722,059.48
42 Tamper Unit/Jam 79,334 79,334 79,548.87 79,548.87 79,658.54 79,658.54 79,660.75 79,660.75 79,555.54 79,555.54 79,441.90 79,441.90 79,424.71 79,424.71 79,517.95 79,517.95 79,633.59 79,633.59
43 Tandem Roller 6-8 T Unit/Jam 383,148 447,000 384,184.89 448,209.43 384,714.52 448,827.32 384,725.23 448,839.82 384,217.11 448,247.01 383,668.29 447,606.73 383,585.23 447,509.84 384,035.53 448,035.18 384,594.05 448,686.78
44 Three Wheel Roller 6-8 T Unit/Jam 127,115 188,438 127,458.99 188,947.85 127,634.70 189,208.33 127,638.25 189,213.60 127,469.68 188,963.69 127,287.60 188,693.77 127,260.04 188,652.93 127,409.44 188,874.39 127,594.73 189,149.08
45 Tire Roller 8-10 T Unit/Jam 227,184 410,000 227,799.04 411,109.32 228,113.08 411,676.07 228,119.43 411,687.53 227,818.14 411,143.79 227,492.73 410,556.51 227,443.48 410,467.63 227,710.48 410,949.49 228,041.65 411,547.15
46 Track Loader 75-100 HP Unit/Jam 212,760 419,332 213,335.61 420,466.57 213,629.71 421,046.22 213,635.66 421,057.94 213,353.50 420,501.83 213,048.74 419,901.18 213,002.62 419,810.28 213,252.67 420,303.11 213,562.81 420,914.37
47 Trailer 20 Ton Unit/Jam 343,481 453,985 344,410.45 455,213.33 344,885.25 455,840.88 344,894.86 455,853.57 344,439.34 455,251.50 343,947.33 454,601.21 343,872.88 454,502.80 344,276.56 455,036.36 344,777.26 455,698.13
48 Trailler 15 Ton Unit/Jam 297,503 297,503 298,308.27 298,308.27 298,719.51 298,719.51 298,727.83 298,727.83 298,333.28 298,333.28 297,907.14 297,907.14 297,842.65 297,842.65 298,192.30 298,192.30 298,625.97 298,625.97
49 Truck Mixer (agitator) Unit/Jam 374,133 550,000 375,145.25 551,488.11 375,662.42 552,248.38 375,672.87 552,263.76 375,176.70 551,534.36 374,640.80 550,746.54 374,559.70 550,627.31 374,999.40 551,273.71 375,544.78 552,075.45
50 Vibrating Rammer Unit/Jam 76,630 76,630 76,836.98 76,836.98 76,942.90 76,942.90 76,945.05 76,945.05 76,843.42 76,843.42 76,733.66 76,733.66 76,717.05 76,717.05 76,807.11 76,807.11 76,918.81 76,918.81
51 Vibratory Roller 5-8 T Unit/Jam 184,813 299,448 185,312.71 300,258.20 185,568.18 300,672.13 185,573.35 300,680.50 185,328.25 300,283.38 185,063.53 299,854.45 185,023.46 299,789.54 185,240.67 300,141.47 185,510.07 300,577.98
52 Water Pump 70-100 MM Unit/Jam 57,698 57,698 57,853.72 57,853.72 57,933.48 57,933.48 57,935.09 57,935.09 57,858.58 57,858.58 57,775.93 57,775.93 57,763.42 57,763.42 57,831.23 57,831.23 57,915.34 57,915.34
53 Water Tanker 3000-4500 L Unit/Jam 209,154 226,034 209,719.75 226,645.57 210,008.87 226,958.02 210,014.72 226,964.34 209,737.34 226,664.58 209,437.75 226,340.81 209,392.41 226,291.81 209,638.22 226,557.46 209,943.11 226,886.95
54 Welding Set Unit/Jam 117,198 117,198 117,515.38 117,515.38 117,677.38 117,677.38 117,680.66 117,680.66 117,525.23 117,525.23 117,357.36 117,357.36 117,331.95 117,331.95 117,469.69 117,469.69 117,640.53 117,640.53
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 203,745 431,188 204,295.97 432,354.65 204,577.61 432,950.68 204,583.30 432,962.74 204,313.10 432,390.90 204,021.25 431,773.27 203,977.09 431,679.80 204,216.54 432,186.56 204,513.54 432,815.11
HARGA SATUAN DASAR BAHAN KABUPATEN MALANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 284,000 284,000 284,768.41 284,768.41 285,160.98 285,160.98 285,168.92 285,168.92 284,792.29 284,792.29 284,385.48 284,385.48 284,323.92 284,323.92 284,657.70 284,657.70 285,071.69 285,071.69
2 Agregat Pecah Mesin 20-30 mm M3 275,000 275,000 275,744.05 275,744.05 276,124.19 276,124.19 276,131.88 276,131.88 275,767.18 275,767.18 275,373.27 275,373.27 275,313.66 275,313.66 275,636.86 275,636.86 276,037.73 276,037.73
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 310,000 310,000 310,838.75 310,838.75 311,267.27 311,267.27 311,275.94 311,275.94 310,864.82 310,864.82 310,420.78 310,420.78 310,353.58 310,353.58 310,717.91 310,717.91 311,169.80 311,169.80
4 Bahan Agr. Base Kelas A M3 298,000 298,000 298,806.28 298,806.28 299,218.22 299,218.22 299,226.55 299,226.55 298,831.34 298,831.34 298,404.49 298,404.49 298,339.89 298,339.89 298,690.12 298,690.12 299,124.52 299,124.52
5 Bahan Agr. Base Kelas B M3 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
6 Bahan Agr. Base Kelas C M3 257,000 257,000 257,695.35 257,695.35 258,050.61 258,050.61 258,057.79 258,057.79 257,716.96 257,716.96 257,348.84 257,348.84 257,293.13 257,293.13 257,595.17 257,595.17 257,969.80 257,969.80
7 Bahan Agr. Base Kelas C2 M3 234,000 234,000 234,633.12 234,633.12 234,956.59 234,956.59 234,963.13 234,963.13 234,652.80 234,652.80 234,317.62 234,317.62 234,266.89 234,266.89 234,541.91 234,541.91 234,883.01 234,883.01
8 Bahan Agr. Base Kelas S M3 190,000 190,000 190,514.07 190,514.07 190,776.71 190,776.71 190,782.03 190,782.03 190,530.05 190,530.05 190,257.89 190,257.89 190,216.71 190,216.71 190,440.01 190,440.01 190,716.97 190,716.97
9 Bahan Pilihan M3 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
10 Bahan Tanah Timbunan M3 108,000 108,000 108,292.21 108,292.21 108,441.50 108,441.50 108,444.52 108,444.52 108,301.29 108,301.29 108,146.59 108,146.59 108,123.18 108,123.18 108,250.11 108,250.11 108,407.54 108,407.54
11 Batu Belah/Kerakal M3 306,000 306,000 306,827.93 306,827.93 307,250.92 307,250.92 307,259.47 307,259.47 306,853.66 306,853.66 306,415.35 306,415.35 306,349.02 306,349.02 306,708.65 306,708.65 307,154.71 307,154.71
12 Batu Kali M3 337,000 337,000 337,911.81 337,911.81 338,377.65 338,377.65 338,387.07 338,387.07 337,940.14 337,940.14 337,457.42 337,457.42 337,384.37 337,384.37 337,780.44 337,780.44 338,271.69 338,271.69
13 Chipping M3 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
14 Chipping (kg) Kg 250 250 250.68 250.68 251.02 251.02 251.03 251.03 250.70 250.70 250.34 250.34 250.29 250.29 250.58 250.58 250.94 250.94
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 360,000 360,000 360,974.04 360,974.04 361,471.67 361,471.67 361,481.73 361,481.73 361,004.31 361,004.31 360,488.64 360,488.64 360,410.61 360,410.61 360,833.70 360,833.70 361,358.48 361,358.48
18 Kapur M3 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
19 Pasir Beton (Kasar) M3 428,000 428,000 429,158.02 429,158.02 429,749.65 429,749.65 429,761.62 429,761.62 429,194.01 429,194.01 428,580.94 428,580.94 428,488.17 428,488.17 428,991.18 428,991.18 429,615.08 429,615.08
20 Pasir Halus (untuk HRS) M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
21 Pasir Pasang (Sedang) M3 303,000 303,000 303,819.81 303,819.81 304,238.66 304,238.66 304,247.12 304,247.12 303,845.29 303,845.29 303,411.27 303,411.27 303,345.59 303,345.59 303,701.70 303,701.70 304,143.38 304,143.38
22 Pasir Urug M3 184,000 184,000 184,497.84 184,497.84 184,752.19 184,752.19 184,757.33 184,757.33 184,513.31 184,513.31 184,249.75 184,249.75 184,209.87 184,209.87 184,426.11 184,426.11 184,694.33 184,694.33
23 Pasir Urug (ada unsur lempung) M3 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
24 Sirtu M3 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 80,000 80,000 80,216.45 80,216.45 80,327.04 80,327.04 80,329.27 80,329.27 80,223.18 80,223.18 80,108.59 80,108.59 80,091.25 80,091.25 80,185.27 80,185.27 80,301.88 80,301.88
26 Anti Pengelupas Liter 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
27 Arbocell Kg 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 14,700 14,700 14,739.77 14,739.77 14,760.09 14,760.09 14,760.50 14,760.50 14,741.01 14,741.01 14,719.95 14,719.95 14,716.77 14,716.77 14,734.04 14,734.04 14,755.47 14,755.47
30 Aspal Emulsi (CSS-1) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
31 Aspal Minyak (Drum) Kg 11,150 11,150 11,180.17 11,180.17 11,195.58 11,195.58 11,195.89 11,195.89 11,181.11 11,181.11 11,165.13 11,165.13 11,162.72 11,162.72 11,175.82 11,175.82 11,192.08 11,192.08
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
40 Beton B-0 M3 531,900 531,900 533,339.02 533,339.02 534,074.28 534,074.28 534,089.15 534,089.15 533,383.75 533,383.75 532,621.86 532,621.86 532,506.56 532,506.56 533,131.68 533,131.68 533,907.04 533,907.04
41 Beton K-125 (fc' 10 MPa) M3 549,930 549,930 551,418.31 551,418.31 552,178.49 552,178.49 552,193.86 552,193.86 551,464.55 551,464.55 550,676.83 550,676.83 550,557.63 550,557.63 551,203.94 551,203.94 552,005.58 552,005.58
42 Beton K-175 (fc' 15 MPa) M3 595,007 595,007 596,616.54 596,616.54 597,439.02 597,439.02 597,455.66 597,455.66 596,666.57 596,666.57 595,814.28 595,814.28 595,685.30 595,685.30 596,384.59 596,384.59 597,251.94 597,251.94
43 Beton K-250 (fc' 20 MPa) M3 662,621 662,621 664,413.87 664,413.87 665,329.82 665,329.82 665,348.34 665,348.34 664,469.59 664,469.59 663,520.45 663,520.45 663,376.81 663,376.81 664,155.57 664,155.57 665,121.48 665,121.48
44 Beton K-300 (fc' 25 MPa) M3 689,667 689,667 691,532.80 691,532.80 692,486.14 692,486.14 692,505.42 692,505.42 691,590.79 691,590.79 690,602.92 690,602.92 690,453.42 690,453.42 691,263.96 691,263.96 692,269.29 692,269.29
45 Beton K-350 (fc' 30 MPa) M3 716,713 716,713 718,651.74 718,651.74 719,642.46 719,642.46 719,662.49 719,662.49 718,712.00 718,712.00 717,685.38 717,685.38 717,530.02 717,530.02 718,372.35 718,372.35 719,417.11 719,417.11
46 Beton K-400 (fc' 35 MPa) M3 743,758 743,758 745,770.67 745,770.67 746,798.78 746,798.78 746,819.57 746,819.57 745,833.21 745,833.21 744,767.85 744,767.85 744,606.63 744,606.63 745,480.74 745,480.74 746,564.92 746,564.92
47 Beton K-450 (fc' 40 MPa) M3 779,819 779,819 781,929.25 781,929.25 783,007.21 783,007.21 783,029.00 783,029.00 781,994.82 781,994.82 780,877.81 780,877.81 780,708.77 780,708.77 781,625.26 781,625.26 782,762.01 782,762.01
48 Beton K-500 (fc' 45 MPa) M3 811,373 811,373 813,568.00 813,568.00 814,689.58 814,689.58 814,712.26 814,712.26 813,636.23 813,636.23 812,474.02 812,474.02 812,298.14 812,298.14 813,251.72 813,251.72 814,434.46 814,434.46
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
51 Cat Anti Karat Kg 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
52 Cat Marka (Non Thermoplas) Kg 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
53 Cat Marka (Thermoplastic) Kg 44,400 44,400 44,520.13 44,520.13 44,581.51 44,581.51 44,582.75 44,582.75 44,523.86 44,523.86 44,460.27 44,460.27 44,450.64 44,450.64 44,502.82 44,502.82 44,567.55 44,567.55
54 Cerucuk Diameter 10-15 cm M' 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,176,000 1,176,000 1,179,181.85 1,179,181.85 1,180,807.45 1,180,807.45 1,180,840.33 1,180,840.33 1,179,280.73 1,179,280.73 1,177,596.23 1,177,596.23 1,177,341.31 1,177,341.31 1,178,723.43 1,178,723.43 1,180,437.69 1,180,437.69
57 Curing Compound Liter 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 550,000 550,000 551,488.11 551,488.11 552,248.38 552,248.38 552,263.76 552,263.76 551,534.36 551,534.36 550,746.54 550,746.54 550,627.31 550,627.31 551,273.71 551,273.71 552,075.45 552,075.45
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 640,000 640,000 641,731.62 641,731.62 642,616.30 642,616.30 642,634.19 642,634.19 641,785.43 641,785.43 640,868.70 640,868.70 640,729.97 640,729.97 641,482.14 641,482.14 642,415.07 642,415.07
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 811,000 811,000 813,194.28 813,194.28 814,315.35 814,315.35 814,338.01 814,338.01 813,262.48 813,262.48 812,100.80 812,100.80 811,925.00 811,925.00 812,878.15 812,878.15 814,060.35 814,060.35
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
64 Oxygen (Isi 6 M3) Botol 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79 155,358.96 155,358.96 155,584.90 155,584.90
65 Polytene 125 Mikron Kg 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
66 Sand Sheet Ton 1,244,000 1,244,000 1,247,365.83 1,247,365.83 1,249,085.44 1,249,085.44 1,249,120.21 1,249,120.21 1,247,470.43 1,247,470.43 1,245,688.53 1,245,688.53 1,245,418.87 1,245,418.87 1,246,880.90 1,246,880.90 1,248,694.29 1,248,694.29
67 Seal Coat M2 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
68 Seal Guard Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
69 Semen/PC (50 kg) Zak 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
77 Baja Tulangan (Polos) U25 Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
78 Baja Tulangan (Polos) U32 Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
79 Baja Tulangan (Polos) U36 Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
80 Baja Tulangan (Ulir) D16 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
81 Baja Tulangan (Ulir) D19 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
82 Baja Tulangan (Ulir) D24 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,368,000 10,368,000 10,396,052.21 10,396,052.21 10,410,384.09 10,410,384.09 10,410,673.89 10,410,673.89 10,396,924.01 10,396,924.01 10,382,072.91 10,382,072.91 10,379,825.45 10,379,825.45 10,392,010.62 10,392,010.62 10,407,124.14 10,407,124.14
87 Box Culvert Type DUB 200×200 M' 11,269,000 11,269,000 11,299,490.01 11,299,490.01 11,315,067.35 11,315,067.35 11,315,382.34 11,315,382.34 11,300,437.57 11,300,437.57 11,284,295.87 11,284,295.87 11,281,853.11 11,281,853.11 11,295,097.19 11,295,097.19 11,311,524.10 11,311,524.10
88 Box Culvert Type uk 300×200 M' 12,441,000 12,441,000 12,474,661.03 12,474,661.03 12,491,858.46 12,491,858.46 12,492,206.20 12,492,206.20 12,475,707.14 12,475,707.14 12,457,886.68 12,457,886.68 12,455,189.86 12,455,189.86 12,469,811.36 12,469,811.36 12,487,946.70 12,487,946.70
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 175,000 175,000 175,473.49 175,473.49 175,715.40 175,715.40 175,720.29 175,720.29 175,488.20 175,488.20 175,237.53 175,237.53 175,199.60 175,199.60 175,405.27 175,405.27 175,660.37 175,660.37
91 Ducting (Strand Prestress) M' 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 1,962,000 1,962,000 1,967,308.49 1,967,308.49 1,970,020.60 1,970,020.60 1,970,075.44 1,970,075.44 1,967,473.47 1,967,473.47 1,964,663.10 1,964,663.10 1,964,237.80 1,964,237.80 1,966,543.68 1,966,543.68 1,969,403.70 1,969,403.70
94 Expansion Join Tipe Rubber M' 1,420,000 1,420,000 1,423,842.03 1,423,842.03 1,425,804.92 1,425,804.92 1,425,844.61 1,425,844.61 1,423,961.43 1,423,961.43 1,421,927.42 1,421,927.42 1,421,619.61 1,421,619.61 1,423,288.49 1,423,288.49 1,425,358.44 1,425,358.44
95 Expansion Join Tipe Torma M' 1,629,000 1,629,000 1,633,407.51 1,633,407.51 1,635,659.31 1,635,659.31 1,635,704.84 1,635,704.84 1,633,544.48 1,633,544.48 1,631,211.11 1,631,211.11 1,630,857.99 1,630,857.99 1,632,772.50 1,632,772.50 1,635,147.11 1,635,147.11
96 Expansion Tipe Joint Asphaltic Plug M' 1,932,000 1,932,000 1,937,227.32 1,937,227.32 1,939,897.96 1,939,897.96 1,939,951.96 1,939,951.96 1,937,389.78 1,937,389.78 1,934,622.38 1,934,622.38 1,934,203.59 1,934,203.59 1,936,474.20 1,936,474.20 1,939,290.49 1,939,290.49
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
99 Glass Bead Kg 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
100 Joint Sealent Kg 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
101 Joint Socket Pile 16×16×16 Set 82,000 82,000 82,221.86 82,221.86 82,335.21 82,335.21 82,337.51 82,337.51 82,228.76 82,228.76 82,111.30 82,111.30 82,093.53 82,093.53 82,189.90 82,189.90 82,309.43 82,309.43
102 Joint Socket Pile 35×35 Set 705,000 705,000 706,907.49 706,907.49 707,882.02 707,882.02 707,901.73 707,901.73 706,966.77 706,966.77 705,956.93 705,956.93 705,804.10 705,804.10 706,632.67 706,632.67 707,660.35 707,660.35
103 Kawat Beton Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
104 Kawat Bronjong Kg 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
105 Kawat Las Dos 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
106 Kayu Acuan (Kelas III/Meranti) M3 3,877,000 3,877,000 3,887,489.82 3,887,489.82 3,892,849.07 3,892,849.07 3,892,957.43 3,892,957.43 3,887,815.82 3,887,815.82 3,882,262.41 3,882,262.41 3,881,422.00 3,881,422.00 3,885,978.51 3,885,978.51 3,891,630.04 3,891,630.04
107 Kayu Perancah (Gelam) M3 2,497,225 2,497,225 2,503,981.63 2,503,981.63 2,507,433.59 2,507,433.59 2,507,503.39 2,507,503.39 2,504,191.61 2,504,191.61 2,500,614.59 2,500,614.59 2,500,073.27 2,500,073.27 2,503,008.17 2,503,008.17 2,506,648.40 2,506,648.40
108 Kerb Pracetak Type 1 (Peninggi) Buah 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 86,000 86,000 86,232.69 86,232.69 86,351.57 86,351.57 86,353.97 86,353.97 86,239.92 86,239.92 86,116.73 86,116.73 86,098.09 86,098.09 86,199.16 86,199.16 86,324.53 86,324.53
110 Marmer Nama Jembatan Buah 541,000 541,000 542,463.76 542,463.76 543,211.59 543,211.59 543,226.71 543,226.71 542,509.25 542,509.25 541,734.32 541,734.32 541,617.05 541,617.05 542,252.87 542,252.87 543,041.49 543,041.49
111 Mata Kucing Buah 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
112 Matras Concrete (Tebal=10 cm) M2 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
113 Mini Pile 16×16×16 M' 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
114 Mini Timber Pile Buah 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
115 Multipleks 12 mm Lbr 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
116 Paku Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
117 Paving Block (Model Bata 8 cm) M2 86,000 86,000 86,232.69 86,232.69 86,351.57 86,351.57 86,353.97 86,353.97 86,239.92 86,239.92 86,116.73 86,116.73 86,098.09 86,098.09 86,199.16 86,199.16 86,324.53 86,324.53
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 59,932,000 59,932,000 60,094,155.21 60,094,155.21 60,177,000.32 60,177,000.32 60,178,675.50 60,178,675.50 60,099,194.62 60,099,194.62 60,013,348.14 60,013,348.14 60,000,356.79 60,000,356.79 60,070,792.89 60,070,792.89 60,158,156.23 60,158,156.23
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 84,904,000 84,904,000 85,133,720.79 85,133,720.79 85,251,085.15 85,251,085.15 85,253,458.33 85,253,458.33 85,140,859.98 85,140,859.98 85,019,243.66 85,019,243.66 85,000,839.16 85,000,839.16 85,100,624.03 85,100,624.03 85,224,389.25 85,224,389.25
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 162,275,000 162,275,000 162,714,059.89 162,714,059.89 162,938,375.62 162,938,375.62 162,942,911.41 162,942,911.41 162,727,704.85 162,727,704.85 162,495,262.47 162,495,262.47 162,460,086.39 162,460,086.39 162,650,802.84 162,650,802.84 162,887,352.37 162,887,352.37
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 212,797,000 212,797,000 213,372,754.90 213,372,754.90 213,666,908.12 213,666,908.12 213,672,856.08 213,672,856.08 213,390,648.03 213,390,648.03 213,085,838.03 213,085,838.03 213,039,710.39 213,039,710.39 213,289,803.68 213,289,803.68 213,599,999.52 213,599,999.52
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 271,260,000 271,260,000 271,993,935.51 271,993,935.51 272,368,903.22 272,368,903.22 272,376,485.29 272,376,485.29 272,016,744.53 272,016,744.53 271,628,192.24 271,628,192.24 271,569,391.68 271,569,391.68 271,888,194.60 271,888,194.60 272,283,612.41 272,283,612.41
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 327,275,000 327,275,000 328,160,492.68 328,160,492.68 328,612,890.95 328,612,890.95 328,622,038.72 328,622,038.72 328,188,011.74 328,188,011.74 327,719,223.68 327,719,223.68 327,648,280.84 327,648,280.84 328,032,916.35 328,032,916.35 328,509,987.66 328,509,987.66
124 Pelat Rambu (Eng. Grade) Buah 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
125 Pelat Rambu (High L Grade) Buah 221,000 221,000 221,597.95 221,597.95 221,903.44 221,903.44 221,909.62 221,909.62 221,616.53 221,616.53 221,299.97 221,299.97 221,252.07 221,252.07 221,511.80 221,511.80 221,833.95 221,833.95
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
128 Pipa Drainase Baja Dia 3" M' 248,000 248,000 248,671.00 248,671.00 249,013.82 249,013.82 249,020.75 249,020.75 248,691.86 248,691.86 248,336.62 248,336.62 248,282.86 248,282.86 248,574.33 248,574.33 248,935.84 248,935.84
129 Pipa Galvanis Dia 1,5" M' 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
130 Pipa Galvanis Dia 2" M' 284,000 284,000 284,768.41 284,768.41 285,160.98 285,160.98 285,168.92 285,168.92 284,792.29 284,792.29 284,385.48 284,385.48 284,323.92 284,323.92 284,657.70 284,657.70 285,071.69 285,071.69
131 Pipa Galvanis Dia 3" M' 217,000 217,000 217,587.13 217,587.13 217,887.09 217,887.09 217,893.16 217,893.16 217,605.37 217,605.37 217,294.54 217,294.54 217,247.50 217,247.50 217,502.54 217,502.54 217,818.86 217,818.86
132 Pipa Porus M' 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
133 Pipa PVC Dia 4" M' 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
134 Plastik Filter M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
135 Rel Pengaman M' 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,852,000 1,852,000 1,857,010.87 1,857,010.87 1,859,570.92 1,859,570.92 1,859,622.69 1,859,622.69 1,857,166.60 1,857,166.60 1,854,513.80 1,854,513.80 1,854,112.34 1,854,112.34 1,856,288.93 1,856,288.93 1,858,988.61 1,858,988.61
137 Strip Bearing Buah 284,000 284,000 284,768.41 284,768.41 285,160.98 285,160.98 285,168.92 285,168.92 284,792.29 284,792.29 284,385.48 284,385.48 284,323.92 284,323.92 284,657.70 284,657.70 285,071.69 285,071.69
138 Tiang Pancang Baja Diameter 400 M' 656,000 656,000 657,774.91 657,774.91 658,681.71 658,681.71 658,700.05 658,700.05 657,830.07 657,830.07 656,890.42 656,890.42 656,748.22 656,748.22 657,519.19 657,519.19 658,475.45 658,475.45
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 802,000 802,000 804,169.93 804,169.93 805,278.55 805,278.55 805,300.97 805,300.97 804,237.37 804,237.37 803,088.59 803,088.59 802,914.74 802,914.74 803,857.30 803,857.30 805,026.38 805,026.38
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,677,000 1,677,000 1,681,537.38 1,681,537.38 1,683,855.53 1,683,855.53 1,683,902.40 1,683,902.40 1,681,678.39 1,681,678.39 1,679,276.26 1,679,276.26 1,678,912.74 1,678,912.74 1,680,883.66 1,680,883.66 1,683,328.24 1,683,328.24
HARGA SATUAN DASAR UPAH KABUPATEN MALANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 108,449.84 108,449.84 108,340.23 108,340.23 108,182.63 108,182.63 108,123.17 108,123.17 108,214.75 108,214.75 108,370.09 108,370.09 108,444.84 108,444.84 108,279.52 108,279.52
2 Tukang OH 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 122,315.76
3 Mandor OH 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 140,362.34
4 Operator OH 289,199.56 289,199.56 288,907.28 288,907.28 288,487.02 288,487.02 288,328.45 288,328.45 288,572.67 288,572.67 288,986.92 288,986.92 289,186.25 289,186.25 288,745.39 288,745.39
5 Pembantu Operator OH 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 180,465.87
6 Sopir OH 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 135,349.40
7 Pembantu Sopir OH 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 117,302.82
8 Mekanik OH 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 162,419.28
9 Pembantu Mekanik OH 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 117,302.82
10 Kepala Tukang OH 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 135,349.40
11 Pemasak Aspal OH 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 135,349.40

HARGA SATUAN DASAR ALAT KABUPATEN MALANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 426,386.98 475,974.28 425,956.05 475,493.23 425,336.42 474,801.55 425,102.64 474,540.58 425,462.71 474,942.52 426,073.47 475,624.30 426,367.36 475,952.37 425,717.37 865,460.59
2 Asphalt Distribution Unit/Jam 262,531.26 337,399.49 262,265.93 337,058.50 261,884.42 336,568.18 261,740.48 336,383.19 261,962.18 336,668.11 262,338.23 337,151.41 262,519.18 337,383.96 262,118.98 577,140.96
3 Asphalt Finisher Unit/Jam 192,824.69 914,794.45 192,629.81 913,869.91 192,349.59 912,540.52 192,243.87 912,038.96 192,406.70 912,811.46 192,682.91 914,121.82 192,815.81 914,752.34 192,521.87 1,089,832.98
4 Asphalt Liquid Mixer Unit/Jam 68,801.30 125,520.64 68,731.76 125,393.79 68,631.78 125,211.38 68,594.06 125,142.56 68,652.16 125,248.55 68,750.71 125,428.35 68,798.13 125,514.87 68,693.25 188,291.18
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 92,338.58 92,338.58 92,245.26 92,245.26 92,111.07 92,111.07 92,060.45 92,060.45 92,138.42 92,138.42 92,270.69 92,270.69 92,334.33 92,334.33 92,193.57 176,702.80
6 Asphalt Mixing Plant Unit/Jam 1,032,019.45 5,876,907.67 1,030,976.43 5,870,968.13 1,029,476.70 5,862,427.77 1,028,910.86 5,859,205.56 1,029,782.36 5,864,168.37 1,031,260.62 5,872,586.47 1,031,971.95 5,876,637.15 1,030,398.73 6,812,193.29
7 Asphalt Sprayer Unit/Jam 85,096.34 85,096.34 85,010.34 85,010.34 84,886.68 84,886.68 84,840.02 84,840.02 84,911.88 84,911.88 85,033.77 85,033.77 85,092.42 85,092.42 84,962.70 162,843.76
8 Asphalt Tanker Unit/Jam 398,323.30 461,915.97 397,920.73 461,449.13 397,341.88 460,777.87 397,123.49 460,524.61 397,459.86 460,914.68 398,030.42 461,576.33 398,304.96 461,894.71 397,697.76 825,740.18
9 Blending Equipment Unit/Jam 129,455.07 204,849.69 129,324.24 204,642.66 129,136.11 204,344.97 129,065.13 204,232.65 129,174.45 204,405.64 129,359.89 204,699.07 129,449.11 204,840.26 129,251.77 323,006.61
10 Bore Pile Machine Unit/Jam 356,680.41 620,574.06 356,319.93 619,946.88 355,801.60 619,045.05 355,606.03 618,704.80 355,907.24 619,228.85 356,418.15 620,117.76 356,663.99 620,545.50 356,120.26 946,037.10
11 Bore Pile Machine Dia 60 Unit/Jam 233,562.30 705,928.10 233,326.25 705,214.65 232,986.83 704,188.79 232,858.77 703,801.74 233,056.01 704,397.87 233,390.56 705,409.04 233,551.55 705,895.61 233,195.50 918,578.13
12 Bore Pile Machine Dia 80 Unit/Jam 923,385.83 923,385.83 922,452.60 922,452.60 921,110.73 921,110.73 920,604.45 920,604.45 921,384.21 921,384.21 922,706.87 922,706.87 923,343.32 923,343.32 921,935.71 1,767,028.00
13 Bulldozer 100-150 HP Unit/Jam 362,112.09 525,178.37 361,746.12 524,647.60 361,219.89 523,884.41 361,021.35 523,596.46 361,327.14 524,039.95 361,845.83 524,792.22 362,095.42 525,154.20 361,543.42 855,762.36
14 Cement Tanker Unit/Jam 336,764.24 434,803.51 336,423.89 434,364.07 335,934.50 433,732.21 335,749.86 433,493.82 336,034.24 433,860.99 336,516.62 434,483.81 336,748.74 434,783.50 336,235.38 742,330.81
15 Cold Milling Unit/Jam 525,967.81 1,400,369.56 525,436.24 1,398,954.26 524,671.90 1,396,919.24 524,383.52 1,396,151.44 524,827.67 1,397,333.99 525,581.07 1,399,339.89 525,943.60 1,400,305.09 525,141.81 1,879,541.57
16 Cold Recycler Unit/Jam 4,429,536.12 4,429,536.12 4,425,059.38 4,425,059.38 4,418,622.35 4,418,622.35 4,416,193.70 4,416,193.70 4,419,934.27 4,419,934.27 4,426,279.15 4,426,279.15 4,429,332.22 4,429,332.22 4,422,579.83 8,476,537.25
17 Compressor 4000-6500 L\M Unit/Jam 134,886.75 156,683.91 134,750.43 156,525.55 134,554.41 156,297.86 134,480.45 156,211.95 134,594.36 156,344.26 134,787.57 156,568.70 134,880.54 156,676.69 134,674.92 279,887.60
18 Concrete Breaker Unit/Jam 491,567.16 936,886.09 491,070.35 935,939.21 490,356.01 934,577.73 490,086.49 934,064.05 490,501.60 934,855.21 491,205.72 936,197.21 491,544.53 936,842.96 490,795.19 1,385,302.13
19 Concrete Mixer (350) Unit/Jam 91,433.30 91,433.30 91,340.89 91,340.89 91,208.02 91,208.02 91,157.89 91,157.89 91,235.10 91,235.10 91,366.07 91,366.07 91,429.09 91,429.09 91,289.71 174,970.42
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 104,107.23 104,107.23 104,002.01 104,002.01 103,850.72 103,850.72 103,793.64 103,793.64 103,881.55 103,881.55 104,030.68 104,030.68 104,102.43 104,102.43 103,943.73 199,223.74
21 Concrete Pan Mixer Unit/Jam 277,015.75 592,457.44 276,735.78 591,858.67 276,333.22 590,997.70 276,181.34 590,672.87 276,415.26 591,173.18 276,812.06 592,021.81 277,003.00 592,430.17 276,580.71 845,054.71
22 Concrete Pump Unit/Jam 210,930.29 247,560.85 210,717.11 247,310.65 210,410.59 246,950.90 210,294.94 246,815.16 210,473.06 247,024.22 210,775.20 247,378.82 210,920.58 247,549.46 210,599.04 440,217.66
23 Concrete Vibrator Unit/Jam 78,759.38 78,759.38 78,679.78 78,679.78 78,565.33 78,565.33 78,522.14 78,522.14 78,588.65 78,588.65 78,701.47 78,701.47 78,755.75 78,755.75 78,635.69 150,717.09
24 Crane 10-15 Ton Unit/Jam 282,447.43 384,842.28 282,161.97 384,453.33 281,751.52 383,894.08 281,596.66 383,683.08 281,835.17 384,008.06 282,239.75 384,559.31 282,434.43 384,824.56 282,003.86 642,736.73
25 Crane On Track 35 Ton Unit/Jam 234,467.58 447,334.49 234,230.61 446,882.39 233,889.88 446,232.32 233,761.33 445,987.05 233,959.32 446,364.81 234,295.18 447,005.57 234,456.78 447,313.90 234,099.36 661,219.14
26 Crane On Track 75-100 Ton Unit/Jam 368,449.05 558,315.82 368,076.67 557,751.56 367,541.24 556,940.21 367,339.23 556,634.09 367,650.37 557,105.57 368,178.13 557,905.30 368,432.09 558,290.12 367,870.43 894,647.42
27 Dump Truck 10 Ton Unit/Jam 348,532.89 353,785.46 348,180.64 353,427.90 347,674.15 352,913.78 347,483.05 352,719.80 347,777.37 353,018.56 348,276.61 353,525.32 348,516.84 353,769.17 347,985.54 672,210.77
28 Dump Truck 3-4 M3 Unit/Jam 190,108.85 260,516.59 189,916.71 260,253.30 189,640.44 259,874.71 189,536.21 259,731.88 189,696.75 259,951.87 189,969.06 260,325.04 190,100.10 260,504.60 189,810.29 434,097.05
29 Excavator 80-140 HP Unit/Jam 275,205.19 454,838.61 274,927.05 454,378.93 274,527.12 453,717.95 274,376.23 453,468.57 274,608.63 453,852.67 275,002.83 454,504.18 275,192.52 454,817.68 274,773.00 705,994.96
30 Flat Bed Truck 3-4 M3 Unit/Jam 334,048.40 445,849.33 333,710.79 445,398.73 333,225.35 444,750.81 333,042.20 444,506.36 333,324.29 444,882.86 333,802.78 445,521.50 334,033.02 445,828.80 333,523.80 750,873.71
31 Fulvi Mixer Unit/Jam 836,478.92 1,306,418.86 835,633.53 1,305,098.52 834,417.95 1,303,200.02 833,959.33 1,302,483.73 834,665.70 1,303,586.95 835,863.87 1,305,458.27 836,440.42 1,306,358.72 835,165.29 2,069,921.41
32 Generator Set Unit/Jam 372,070.17 550,283.51 371,694.14 549,727.36 371,153.44 548,927.68 370,949.44 548,625.97 371,263.64 549,090.66 371,796.59 549,878.89 372,053.04 550,258.18 371,485.86 889,941.80
33 Hot Recycler Unit/Jam 2,733,040.99 8,014,242.07 2,730,278.82 8,006,142.41 2,726,307.15 7,994,496.07 2,724,808.66 7,990,101.98 2,727,116.61 7,996,869.70 2,731,031.42 8,008,349.31 2,732,915.18 8,013,873.15 2,728,748.93 10,502,963.71
34 Jack Hammer Unit/Jam 51,600.97 52,216.59 51,548.82 52,163.81 51,473.83 52,087.93 51,445.54 52,059.30 51,489.12 52,103.40 51,563.03 52,178.19 51,598.60 52,214.18 51,519.94 99,360.33
35 Launching Gantry Unit/Jam 65,668,121.98 65,668,121.98 65,601,753.97 65,601,753.97 65,506,324.68 65,506,324.68 65,470,319.84 65,470,319.84 65,525,774.02 65,525,774.02 65,619,837.16 65,619,837.16 65,665,099.12 65,665,099.12 65,564,994.58 125,665,141.17
36 Motor Grader > 100 HP Unit/Jam 258,004.86 528,202.92 257,744.11 527,669.09 257,369.17 526,901.50 257,227.71 526,611.89 257,445.59 527,057.94 257,815.16 527,814.54 257,992.99 528,178.60 257,599.68 763,502.14
37 Pedestrian Roller Unit/Jam 85,096.34 85,096.34 85,010.34 85,010.34 84,886.68 84,886.68 84,840.02 84,840.02 84,911.88 84,911.88 85,033.77 85,033.77 85,092.42 85,092.42 84,962.70 162,843.76
38 Pile Driver + Hammer Unit/Jam 96,864.98 283,174.57 96,767.09 282,888.38 96,626.32 282,476.87 96,573.21 282,321.61 96,655.01 282,560.74 96,793.76 282,966.36 96,860.52 283,161.54 96,712.86 371,381.70
39 Rock Drill Breaker Unit/Jam 94,149.14 306,270.37 94,053.99 305,960.84 93,917.17 305,515.76 93,865.55 305,347.84 93,945.06 305,606.47 94,079.92 306,045.17 94,144.81 306,256.27 94,001.29 391,955.67
40 Split Form Paver Unit/Jam 199,161.65 199,161.65 198,960.36 198,960.36 198,670.94 198,670.94 198,561.74 198,561.74 198,729.93 198,729.93 199,015.21 199,015.21 199,152.48 199,152.48 198,848.88 381,123.69
41 Stone Crusher Unit/Jam 533,210.05 722,341.18 532,671.16 721,611.14 531,896.29 720,561.43 531,603.94 720,165.38 532,054.22 720,775.37 532,817.99 721,810.05 533,185.51 722,307.93 532,372.68 1,209,206.16
42 Tamper Unit/Jam 79,664.66 79,664.66 79,584.15 79,584.15 79,468.38 79,468.38 79,424.70 79,424.70 79,491.97 79,491.97 79,606.08 79,606.08 79,660.99 79,660.99 79,539.55 152,449.47
43 Tandem Roller 6-8 T Unit/Jam 384,744.09 448,861.82 384,355.25 448,408.18 383,796.14 447,755.89 383,585.19 447,509.78 383,910.09 447,888.83 384,461.20 448,531.78 384,726.38 448,841.16 384,139.88 800,278.70
44 Three Wheel Roller 6-8 T Unit/Jam 127,644.51 189,222.87 127,515.51 189,031.63 127,330.01 188,756.65 127,260.03 188,652.91 127,367.82 188,812.70 127,550.66 189,083.74 127,638.64 189,214.16 127,444.05 305,747.29
45 Tire Roller 8-10 T Unit/Jam 228,130.62 411,707.71 227,900.05 411,291.62 227,568.53 410,693.32 227,443.45 410,467.59 227,636.10 410,815.26 227,962.87 411,404.99 228,120.11 411,688.76 227,772.35 619,848.66
46 Track Loader 75-100 HP Unit/Jam 213,646.13 421,078.58 213,430.21 420,653.01 213,119.74 420,041.10 213,002.60 419,810.23 213,183.01 420,165.81 213,489.04 420,768.97 213,636.30 421,059.20 213,310.62 615,948.46
47 Trailer 20 Ton Unit/Jam 344,911.76 455,875.92 344,563.18 455,415.18 344,061.95 454,752.70 343,872.84 454,502.75 344,164.10 454,887.72 344,658.16 455,540.72 344,895.89 455,854.93 344,370.10 770,826.82
48 Trailler 15 Ton Unit/Jam 298,742.47 298,742.47 298,440.55 298,440.55 298,006.41 298,006.41 297,842.62 297,842.62 298,094.89 298,094.89 298,522.81 298,522.81 298,728.72 298,728.72 298,273.32 571,685.53
49 Truck Mixer (agitator) Unit/Jam 375,691.29 552,290.83 375,311.60 551,732.66 374,765.64 550,930.06 374,559.65 550,627.25 374,876.91 551,093.64 375,415.05 551,884.74 375,674.00 552,265.41 375,101.29 895,260.07
50 Vibrating Rammer Unit/Jam 76,948.82 76,948.82 76,871.05 76,871.05 76,759.23 76,759.23 76,717.04 76,717.04 76,782.02 76,782.02 76,892.24 76,892.24 76,945.28 76,945.28 76,827.98 147,252.33
51 Vibratory Roller 5-8 T Unit/Jam 185,582.45 300,695.25 185,394.89 300,391.35 185,125.20 299,954.37 185,023.44 299,789.51 185,180.16 300,043.43 185,445.99 300,474.15 185,573.90 300,681.40 185,291.00 470,070.00
52 Water Pump 70-100 MM Unit/Jam 57,937.93 57,937.93 57,879.38 57,879.38 57,795.18 57,795.18 57,763.42 57,763.42 57,812.34 57,812.34 57,895.33 57,895.33 57,935.27 57,935.27 57,846.95 110,872.35
53 Water Tanker 3000-4500 L Unit/Jam 210,025.01 226,975.47 209,812.75 226,746.07 209,507.54 226,416.23 209,392.38 226,291.78 209,569.74 226,483.45 209,870.58 226,808.57 210,015.34 226,965.02 209,695.18 418,836.09
54 Welding Set Unit/Jam 117,686.43 117,686.43 117,567.49 117,567.49 117,396.47 117,396.47 117,331.94 117,331.94 117,431.32 117,431.32 117,599.90 117,599.90 117,681.01 117,681.01 117,501.61 225,209.45
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 204,593.33 432,983.96 204,386.56 432,546.36 204,089.24 431,917.15 203,977.06 431,679.75 204,149.84 432,045.39 204,442.90 432,665.60 204,583.91 432,964.03 204,272.03 619,549.93
HARGA SATUAN DASAR BAHAN KABUPATEN MALANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 285,182.90 285,182.90 284,894.68 284,894.68 284,480.25 284,480.25 284,323.89 284,323.89 284,564.72 284,564.72 284,973.21 284,973.21 285,169.78 285,169.78 284,735.04 545,737.39
2 Agregat Pecah Mesin 20-30 mm M3 276,145.42 276,145.42 275,866.33 275,866.33 275,465.03 275,465.03 275,313.63 275,313.63 275,546.82 275,546.82 275,942.37 275,942.37 276,132.70 276,132.70 275,711.75 528,442.90
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 311,291.20 311,291.20 310,976.59 310,976.59 310,524.22 310,524.22 310,353.54 310,353.54 310,616.41 310,616.41 311,062.31 311,062.31 311,276.87 311,276.87 310,802.33 595,699.27
4 Bahan Agr. Base Kelas A M3 299,241.21 299,241.21 298,938.78 298,938.78 298,503.93 298,503.93 298,339.86 298,339.86 298,592.55 298,592.55 299,021.19 299,021.19 299,227.44 299,227.44 298,771.28 572,639.94
5 Bahan Agr. Base Kelas B M3 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
6 Bahan Agr. Base Kelas C M3 258,070.44 258,070.44 257,809.62 257,809.62 257,434.59 257,434.59 257,293.10 257,293.10 257,511.03 257,511.03 257,880.69 257,880.69 258,058.56 258,058.56 257,665.16 493,853.91
7 Bahan Agr. Base Kelas C2 M3 234,974.65 234,974.65 234,737.17 234,737.17 234,395.70 234,395.70 234,266.87 234,266.87 234,465.29 234,465.29 234,801.87 234,801.87 234,963.83 234,963.83 234,605.63 449,656.87
8 Bahan Agr. Base Kelas S M3 190,791.38 190,791.38 190,598.55 190,598.55 190,321.29 190,321.29 190,216.69 190,216.69 190,377.80 190,377.80 190,651.09 190,651.09 190,782.60 190,782.60 190,491.75 365,106.00
9 Bahan Pilihan M3 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 363,184.39
10 Bahan Tanah Timbunan M3 108,449.84 108,449.84 108,340.23 108,340.23 108,182.63 108,182.63 108,123.17 108,123.17 108,214.75 108,214.75 108,370.09 108,370.09 108,444.84 108,444.84 108,279.52 207,533.94
11 Batu Belah/Kerakal M3 307,274.54 307,274.54 306,963.99 306,963.99 306,517.45 306,517.45 306,348.98 306,348.98 306,608.46 306,608.46 307,048.60 307,048.60 307,260.39 307,260.39 306,791.98 588,012.83
12 Batu Kali M3 338,403.66 338,403.66 338,061.65 338,061.65 337,569.88 337,569.88 337,384.33 337,384.33 337,670.10 337,670.10 338,154.83 338,154.83 338,388.08 338,388.08 337,872.22 647,582.75
13 Chipping M3 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
14 Chipping (kg) Kg 251.04 251.04 250.79 250.79 250.42 250.42 250.29 250.29 250.50 250.50 250.86 250.86 251.03 251.03 250.65 480.40
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 361,499.45 361,499.45 361,134.10 361,134.10 360,608.77 360,608.77 360,410.56 360,410.56 360,715.84 360,715.84 361,233.65 361,233.65 361,482.81 361,482.81 360,931.74 691,779.79
18 Kapur M3 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
19 Pasir Beton (Kasar) M3 429,782.68 429,782.68 429,348.32 429,348.32 428,723.76 428,723.76 428,488.12 428,488.12 428,851.05 428,851.05 429,466.67 429,466.67 429,762.90 429,762.90 429,107.74 822,449.31
20 Pasir Halus (untuk HRS) M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
21 Pasir Pasang (Sedang) M3 304,262.04 304,262.04 303,954.54 303,954.54 303,512.38 303,512.38 303,345.56 303,345.56 303,602.50 303,602.50 304,038.32 304,038.32 304,248.03 304,248.03 303,784.22 582,247.99
22 Pasir Urug M3 184,766.39 184,766.39 184,579.65 184,579.65 184,311.15 184,311.15 184,209.84 184,209.84 184,365.87 184,365.87 184,630.53 184,630.53 184,757.88 184,757.88 184,476.22 353,576.34
23 Pasir Urug (ada unsur lempung) M3 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 276,711.92
24 Sirtu M3 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 80,333.21 80,333.21 80,252.02 80,252.02 80,135.28 80,135.28 80,091.24 80,091.24 80,159.07 80,159.07 80,274.14 80,274.14 80,329.51 80,329.51 80,207.05 153,728.84
26 Anti Pengelupas Liter 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
27 Arbocell Kg 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 245,966.15
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 14,761.23 14,761.23 14,746.31 14,746.31 14,724.86 14,724.86 14,716.76 14,716.76 14,729.23 14,729.23 14,750.37 14,750.37 14,760.55 14,760.55 14,738.05 28,247.67
30 Aspal Emulsi (CSS-1) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
31 Aspal Minyak (Drum) Kg 11,196.44 11,196.44 11,185.13 11,185.13 11,168.85 11,168.85 11,162.72 11,162.72 11,172.17 11,172.17 11,188.21 11,188.21 11,195.93 11,195.93 11,178.86 21,425.96
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
40 Beton B-0 M3 534,115.33 534,115.33 533,575.52 533,575.52 532,799.34 532,799.34 532,506.50 532,506.50 532,957.54 532,957.54 533,722.60 533,722.60 534,090.74 534,090.74 533,276.54 1,022,104.43
41 Beton K-125 (fc' 10 MPa) M3 552,220.94 552,220.94 551,662.83 551,662.83 550,860.34 550,860.34 550,557.56 550,557.56 551,023.89 551,023.89 551,814.90 551,814.90 552,195.52 552,195.52 551,353.71 1,056,752.04
42 Beton K-175 (fc' 15 MPa) M3 597,484.95 597,484.95 596,881.09 596,881.09 596,012.82 596,012.82 595,685.23 595,685.23 596,189.79 596,189.79 597,045.62 597,045.62 597,457.44 597,457.44 596,546.64 1,143,371.06
43 Beton K-250 (fc' 20 MPa) M3 665,380.96 665,380.96 664,708.49 664,708.49 663,741.55 663,741.55 663,376.74 663,376.74 663,938.62 663,938.62 664,891.72 664,891.72 665,350.33 665,350.33 664,336.03 1,273,299.59
44 Beton K-300 (fc' 25 MPa) M3 692,539.37 692,539.37 691,839.45 691,839.45 690,833.05 690,833.05 690,453.34 690,453.34 691,038.16 691,038.16 692,030.16 692,030.16 692,507.49 692,507.49 691,451.78 1,325,271.00
45 Beton K-350 (fc' 30 MPa) M3 719,697.78 719,697.78 718,970.41 718,970.41 717,924.54 717,924.54 717,529.94 717,529.94 718,137.70 718,137.70 719,168.59 719,168.59 719,664.65 719,664.65 718,567.54 1,377,242.41
46 Beton K-400 (fc' 35 MPa) M3 746,856.18 746,856.18 746,101.37 746,101.37 745,016.03 745,016.03 744,606.54 744,606.54 745,237.23 745,237.23 746,307.03 746,307.03 746,821.80 746,821.80 745,683.29 1,429,213.82
47 Beton K-450 (fc' 40 MPa) M3 783,067.39 783,067.39 782,275.98 782,275.98 781,138.02 781,138.02 780,708.68 780,708.68 781,369.95 781,369.95 782,491.61 782,491.61 783,031.35 783,031.35 781,837.64 1,498,509.04
48 Beton K-500 (fc' 45 MPa) M3 814,752.20 814,752.20 813,928.76 813,928.76 812,744.76 812,744.76 812,298.04 812,298.04 812,986.07 812,986.07 814,153.12 814,153.12 814,714.69 814,714.69 813,472.69 1,559,142.35
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
51 Cat Anti Karat Kg 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
52 Cat Marka (Non Thermoplas) Kg 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
53 Cat Marka (Thermoplastic) Kg 44,584.93 44,584.93 44,539.87 44,539.87 44,475.08 44,475.08 44,450.64 44,450.64 44,488.29 44,488.29 44,552.15 44,552.15 44,582.88 44,582.88 44,514.92 85,319.51
54 Cerucuk Diameter 10-15 cm M' 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,180,898.22 1,180,898.22 1,179,704.73 1,179,704.73 1,177,988.65 1,177,988.65 1,177,341.18 1,177,341.18 1,178,338.40 1,178,338.40 1,180,029.92 1,180,029.92 1,180,843.86 1,180,843.86 1,179,043.70 2,259,814.00
57 Curing Compound Liter 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 552,290.83 552,290.83 551,732.66 551,732.66 550,930.06 550,930.06 550,627.25 550,627.25 551,093.64 551,093.64 551,884.74 551,884.74 552,265.41 552,265.41 551,423.50 1,056,885.80
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 642,665.70 642,665.70 642,016.18 642,016.18 641,082.26 641,082.26 640,729.89 640,729.89 641,272.60 641,272.60 642,193.15 642,193.15 642,636.11 642,636.11 641,656.43 1,229,830.75
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 814,377.94 814,377.94 813,554.88 813,554.88 812,371.42 812,371.42 811,924.91 811,924.91 812,612.62 812,612.62 813,779.14 813,779.14 814,340.45 814,340.45 813,099.01 1,558,426.15
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
64 Oxygen (Isi 6 M3) Botol 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43 155,401.17 297,849.63
65 Polytene 125 Mikron Kg 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
66 Sand Sheet Ton 1,249,181.45 1,249,181.45 1,247,918.95 1,247,918.95 1,246,103.63 1,246,103.63 1,245,418.73 1,245,418.73 1,246,473.61 1,246,473.61 1,248,262.94 1,248,262.94 1,249,123.94 1,249,123.94 1,247,219.69 2,390,483.51
67 Seal Coat M2 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 190,239.44
68 Seal Guard Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
69 Semen/PC (50 kg) Zak 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
77 Baja Tulangan (Polos) U25 Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
78 Baja Tulangan (Polos) U32 Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
79 Baja Tulangan (Polos) U36 Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
80 Baja Tulangan (Ulir) D16 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
81 Baja Tulangan (Ulir) D19 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
82 Baja Tulangan (Ulir) D24 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,411,184.28 10,411,184.28 10,400,662.14 10,400,662.14 10,385,532.54 10,385,532.54 10,379,824.25 10,379,824.25 10,388,616.09 10,388,616.09 10,403,529.09 10,403,529.09 10,410,705.03 10,410,705.03 10,394,834.21 19,923,258.09
87 Box Culvert Type DUB 200×200 M' 11,315,937.08 11,315,937.08 11,304,500.54 11,304,500.54 11,288,056.16 11,288,056.16 11,281,851.80 11,281,851.80 11,291,407.67 11,291,407.67 11,307,616.64 11,307,616.64 11,315,416.18 11,315,416.18 11,298,166.16 21,654,629.19
88 Box Culvert Type uk 300×200 M' 12,492,818.64 12,492,818.64 12,480,192.67 12,480,192.67 12,462,038.04 12,462,038.04 12,455,188.42 12,455,188.42 12,465,738.11 12,465,738.11 12,483,632.85 12,483,632.85 12,492,243.57 12,492,243.57 12,473,199.50 23,906,756.74
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 175,728.90 175,728.90 175,551.30 175,551.30 175,295.93 175,295.93 175,199.58 175,199.58 175,347.98 175,347.98 175,599.69 175,599.69 175,720.81 175,720.81 175,452.93 336,281.84
91 Ducting (Strand Prestress) M' 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 1,970,172.03 1,970,172.03 1,968,180.86 1,968,180.86 1,965,317.79 1,965,317.79 1,964,237.58 1,964,237.58 1,965,901.31 1,965,901.31 1,968,723.39 1,968,723.39 1,970,081.33 1,970,081.33 1,967,078.00 3,770,199.88
94 Expansion Join Tipe Rubber M' 1,425,914.51 1,425,914.51 1,424,473.40 1,424,473.40 1,422,401.26 1,422,401.26 1,421,619.45 1,421,619.45 1,422,823.58 1,422,823.58 1,424,866.06 1,424,866.06 1,425,848.88 1,425,848.88 1,423,675.21 2,728,686.97
95 Expansion Join Tipe Torma M' 1,635,785.03 1,635,785.03 1,634,131.81 1,634,131.81 1,631,754.68 1,631,754.68 1,630,857.80 1,630,857.80 1,632,239.16 1,632,239.16 1,634,582.26 1,634,582.26 1,635,709.73 1,635,709.73 1,633,216.14 3,130,303.57
96 Expansion Tipe Joint Asphaltic Plug M' 1,940,047.07 1,940,047.07 1,938,086.35 1,938,086.35 1,935,267.06 1,935,267.06 1,934,203.36 1,934,203.36 1,935,841.66 1,935,841.66 1,938,620.58 1,938,620.58 1,939,957.77 1,939,957.77 1,937,000.36 3,712,551.57
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
99 Glass Bead Kg 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
100 Joint Sealent Kg 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
101 Joint Socket Pile 16×16×16 Set 82,341.54 82,341.54 82,258.32 82,258.32 82,138.66 82,138.66 82,093.52 82,093.52 82,163.05 82,163.05 82,281.00 82,281.00 82,337.75 82,337.75 82,212.23 157,572.06
102 Joint Socket Pile 35×35 Set 707,936.43 707,936.43 707,220.95 707,220.95 706,192.17 706,192.17 705,804.02 705,804.02 706,401.85 706,401.85 707,415.90 707,415.90 707,903.84 707,903.84 706,824.66 1,354,735.43
103 Kawat Beton Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
104 Kawat Bronjong Kg 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
105 Kawat Las Dos 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
106 Kayu Acuan (Kelas III/Meranti) M3 3,893,148.29 3,893,148.29 3,889,213.65 3,889,213.65 3,883,556.10 3,883,556.10 3,881,421.55 3,881,421.55 3,884,709.16 3,884,709.16 3,890,285.71 3,890,285.71 3,892,969.08 3,892,969.08 3,887,034.36 7,450,084.07
107 Kayu Perancah (Gelam) M3 2,507,626.32 2,507,626.32 2,505,091.97 2,505,091.97 2,501,447.87 2,501,447.87 2,500,072.98 2,500,072.98 2,502,190.57 2,502,190.57 2,505,782.50 2,505,782.50 2,507,510.89 2,507,510.89 2,503,688.26 4,798,693.88
108 Kerb Pracetak Type 1 (Peninggi) Buah 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 86,358.20 86,358.20 86,270.92 86,270.92 86,145.43 86,145.43 86,098.08 86,098.08 86,171.01 86,171.01 86,294.71 86,294.71 86,354.23 86,354.23 86,222.58 165,258.51
110 Marmer Nama Jembatan Buah 543,253.35 543,253.35 542,704.30 542,704.30 541,914.84 541,914.84 541,616.99 541,616.99 542,075.74 542,075.74 542,853.90 542,853.90 543,228.34 543,228.34 542,400.20 1,039,591.30
111 Mata Kucing Buah 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 272,868.70
112 Matras Concrete (Tebal=10 cm) M2 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
113 Mini Pile 16×16×16 M' 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 234,436.49
114 Mini Timber Pile Buah 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
115 Multipleks 12 mm Lbr 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 276,711.92
116 Paku Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
117 Paving Block (Model Bata 8 cm) M2 86,358.20 86,358.20 86,270.92 86,270.92 86,145.43 86,145.43 86,098.08 86,098.08 86,171.01 86,171.01 86,294.71 86,294.71 86,354.23 86,354.23 86,222.58 165,258.51
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 60,181,625.82 60,181,625.82 60,120,802.78 60,120,802.78 60,033,346.49 60,033,346.49 60,000,349.82 60,000,349.82 60,051,170.86 60,051,170.86 60,137,375.14 60,137,375.14 60,178,855.51 60,178,855.51 60,087,114.59 115,165,962.96
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 85,257,637.96 85,257,637.96 85,171,471.65 85,171,471.65 85,047,574.76 85,047,574.76 85,000,829.29 85,000,829.29 85,072,826.05 85,072,826.05 85,194,949.26 85,194,949.26 85,253,713.35 85,253,713.35 85,123,746.53 163,152,421.40
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 162,950,899.85 162,950,899.85 162,786,212.22 162,786,212.22 162,549,411.04 162,549,411.04 162,460,067.53 162,460,067.53 162,597,673.22 162,597,673.22 162,831,084.41 162,831,084.41 162,943,398.83 162,943,398.83 162,694,996.33 311,829,350.60
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 213,683,331.60 213,683,331.60 213,467,370.83 213,467,370.83 213,156,844.99 213,156,844.99 213,039,685.66 213,039,685.66 213,220,132.91 213,220,132.91 213,526,213.34 213,526,213.34 213,673,495.24 213,673,495.24 213,347,756.19 408,912,958.37
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 272,389,838.81 272,389,838.81 272,114,545.84 272,114,545.84 271,718,707.37 271,718,707.37 271,569,360.15 271,569,360.15 271,799,382.76 271,799,382.76 272,189,554.50 272,189,554.50 272,377,300.05 272,377,300.05 271,962,068.75 521,256,075.45
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 328,638,149.73 328,638,149.73 328,306,008.96 328,306,008.96 327,828,430.12 327,828,430.12 327,648,242.81 327,648,242.81 327,925,764.92 327,925,764.92 328,396,506.86 328,396,506.86 328,623,021.73 328,623,021.73 328,122,045.45 628,895,089.92
124 Pelat Rambu (Eng. Grade) Buah 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 363,184.39
125 Pelat Rambu (High L Grade) Buah 221,920.50 221,920.50 221,696.21 221,696.21 221,373.72 221,373.72 221,252.04 221,252.04 221,439.44 221,439.44 221,757.32 221,757.32 221,910.28 221,910.28 221,571.99 424,675.93
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
128 Pipa Drainase Baja Dia 3" M' 249,032.96 249,032.96 248,781.27 248,781.27 248,419.37 248,419.37 248,282.83 248,282.83 248,493.13 248,493.13 248,849.85 248,849.85 249,021.49 249,021.49 248,641.87 476,559.41
129 Pipa Galvanis Dia 1,5" M' 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 190,239.44
130 Pipa Galvanis Dia 2" M' 285,182.90 285,182.90 284,894.68 284,894.68 284,480.25 284,480.25 284,323.89 284,323.89 284,564.72 284,564.72 284,973.21 284,973.21 285,169.78 285,169.78 284,735.04 545,737.39
131 Pipa Galvanis Dia 3" M' 217,903.84 217,903.84 217,683.61 217,683.61 217,366.95 217,366.95 217,247.48 217,247.48 217,431.49 217,431.49 217,743.62 217,743.62 217,893.81 217,893.81 217,561.63 416,989.49
132 Pipa Porus M' 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
133 Pipa PVC Dia 4" M' 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 205,612.33
134 Plastik Filter M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
135 Rel Pengaman M' 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,859,713.86 1,859,713.86 1,857,834.32 1,857,834.32 1,855,131.78 1,855,131.78 1,854,112.12 1,854,112.12 1,855,682.58 1,855,682.58 1,858,346.44 1,858,346.44 1,859,628.25 1,859,628.25 1,856,793.30 3,558,822.72
137 Strip Bearing Buah 285,182.90 285,182.90 284,894.68 284,894.68 284,480.25 284,480.25 284,323.89 284,323.89 284,564.72 284,564.72 284,973.21 284,973.21 285,169.78 285,169.78 284,735.04 545,737.39
138 Tiang Pancang Baja Diameter 400 M' 658,732.34 658,732.34 658,066.59 658,066.59 657,109.31 657,109.31 656,748.14 656,748.14 657,304.41 657,304.41 658,247.98 658,247.98 658,702.02 658,702.02 657,697.84 1,260,576.52
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 805,340.45 805,340.45 804,526.53 804,526.53 803,356.20 803,356.20 802,914.65 802,914.65 803,594.72 803,594.72 804,748.30 804,748.30 805,303.38 805,303.38 804,075.72 1,541,131.65
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,683,984.96 1,683,984.96 1,682,283.03 1,682,283.03 1,679,835.85 1,679,835.85 1,678,912.55 1,678,912.55 1,680,334.60 1,680,334.60 1,682,746.75 1,682,746.75 1,683,907.44 1,683,907.44 1,681,340.37 3,222,540.88
HARGA SATUAN DASAR UPAH KOTA BLITAR TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
2 Tukang OH 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
3 Mandor OH 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
4 Operator OH 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
5 Pembantu Operator OH 177,000 177,000 177,478.90 177,478.90 177,723.57 177,723.57 177,728.52 177,728.52 177,493.78 177,493.78 177,240.25 177,240.25 177,201.88 177,201.88 177,409.90 177,409.90 177,667.92 177,667.92
6 Sopir OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
7 Pembantu Sopir OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
8 Mekanik OH 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
9 Pembantu Mekanik OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
10 Kepala Tukang OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
11 Pemasak Aspal OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88

HARGA SATUAN DASAR ALAT KOTA BLITAR TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 416,856 466,000 417,983.84 467,260.83 418,560.07 467,904.99 418,571.72 467,918.02 418,018.89 467,300.02 417,421.79 466,632.52 417,331.43 466,531.51 417,821.34 467,079.18 418,429.00 467,758.47
2 Asphalt Distribution Unit/Jam 256,663 330,000 257,357.35 330,892.87 257,712.14 331,349.03 257,719.32 331,358.25 257,378.94 330,920.61 257,011.29 330,447.92 256,955.66 330,376.39 257,257.30 330,764.23 257,631.44 331,245.27
3 Asphalt Finisher Unit/Jam 188,514 894,000 189,024.54 896,418.85 189,285.13 897,654.65 189,290.40 897,679.64 189,040.39 896,494.03 188,770.36 895,213.46 188,729.50 895,019.67 188,951.05 896,070.36 189,225.85 897,373.55
4 Asphalt Liquid Mixer Unit/Jam 67,263 123,000 67,445.38 123,332.80 67,538.35 123,502.82 67,540.24 123,506.26 67,451.03 123,343.14 67,354.68 123,166.95 67,340.10 123,140.29 67,419.16 123,284.85 67,517.21 123,464.15
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 90,275 90,275 90,518.79 90,518.79 90,643.58 90,643.58 90,646.10 90,646.10 90,526.38 90,526.38 90,397.08 90,397.08 90,377.51 90,377.51 90,483.60 90,483.60 90,615.20 90,615.20
6 Asphalt Mixing Plant Unit/Jam 1,008,951 5,175,386 1,011,680.63 5,189,388.30 1,013,075.32 5,196,542.33 1,013,103.53 5,196,686.99 1,011,765.47 5,189,823.47 1,010,320.25 5,182,410.26 1,010,101.54 5,181,288.40 1,011,287.33 5,187,370.86 1,012,758.09 5,194,915.06
7 Asphalt Sprayer Unit/Jam 83,194 83,194 83,419.28 83,419.28 83,534.28 83,534.28 83,536.61 83,536.61 83,426.28 83,426.28 83,307.11 83,307.11 83,289.07 83,289.07 83,386.85 83,386.85 83,508.12 83,508.12
8 Asphalt Tanker Unit/Jam 389,420 451,000 390,473.23 452,220.25 391,011.53 452,843.68 391,022.41 452,856.28 390,505.97 452,258.17 389,948.17 451,612.16 389,863.75 451,514.40 390,321.43 452,044.44 390,889.09 452,701.87
9 Blending Equipment Unit/Jam 126,561 200,000 126,903.80 200,541.13 127,078.75 200,817.59 127,082.28 200,823.18 126,914.44 200,557.95 126,733.15 200,271.47 126,705.72 200,228.11 126,854.46 200,463.17 127,038.95 200,754.71
10 Bore Pile Machine Unit/Jam 348,708 606,000 349,651.03 607,639.63 350,133.05 608,477.31 350,142.80 608,494.25 349,680.35 607,690.58 349,180.86 606,822.55 349,105.27 606,691.19 349,515.09 607,403.40 350,023.41 608,286.77
11 Bore Pile Machine Dia 60 Unit/Jam 228,341 690,000 228,959.30 691,866.90 229,274.94 692,820.70 229,281.32 692,839.99 228,978.50 691,924.92 228,651.43 690,936.57 228,601.93 690,786.99 228,870.29 691,597.93 229,203.15 692,603.75
12 Bore Pile Machine Dia 80 Unit/Jam 902,745 902,745 905,187.94 905,187.94 906,435.82 906,435.82 906,461.05 906,461.05 905,263.84 905,263.84 903,970.75 903,970.75 903,775.07 903,775.07 904,836.03 904,836.03 906,151.97 906,151.97
13 Bulldozer 100-150 HP Unit/Jam 354,018 513,000 354,975.66 514,388.00 355,465.03 515,097.13 355,474.92 515,111.47 355,005.43 514,431.14 354,498.33 513,696.32 354,421.59 513,585.11 354,837.66 514,188.03 355,353.71 514,935.83
14 Cement Tanker Unit/Jam 329,237 425,000 330,127.36 426,149.90 330,582.47 426,737.39 330,591.68 426,749.27 330,155.05 426,185.64 329,683.45 425,576.87 329,612.08 425,484.74 329,999.02 425,984.23 330,478.95 426,603.76
15 Cold Milling Unit/Jam 514,211 1,094,000 515,602.15 1,096,959.98 516,312.95 1,098,472.24 516,327.32 1,098,502.82 515,645.39 1,097,051.97 514,908.83 1,095,484.93 514,797.37 1,095,247.79 515,401.70 1,096,533.53 516,151.27 1,098,128.26
16 Cold Recycler Unit/Jam 4,330,523 4,330,523 4,342,239.77 4,342,239.77 4,348,225.93 4,348,225.93 4,348,346.98 4,348,346.98 4,342,603.91 4,342,603.91 4,336,400.87 4,336,400.87 4,335,462.15 4,335,462.15 4,340,551.67 4,340,551.67 4,346,864.31 4,346,864.31
17 Compressor 4000-6500 L\M Unit/Jam 131,872 131,872 132,228.43 132,228.43 132,410.72 132,410.72 132,414.41 132,414.41 132,239.52 132,239.52 132,050.63 132,050.63 132,022.04 132,022.04 132,177.03 132,177.03 132,369.26 132,369.26
18 Concrete Breaker Unit/Jam 480,579 916,000 481,879.46 918,478.38 482,543.77 919,744.58 482,557.21 919,770.19 481,919.87 918,555.40 481,231.49 917,243.32 481,127.31 917,044.76 481,692.12 918,121.31 482,392.67 919,456.57
19 Concrete Mixer (350) Unit/Jam 89,389 89,389 89,631.35 89,631.35 89,754.92 89,754.92 89,757.42 89,757.42 89,638.87 89,638.87 89,510.83 89,510.83 89,491.45 89,491.45 89,596.51 89,596.51 89,726.81 89,726.81
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 101,780 101,780 102,055.50 102,055.50 102,196.20 102,196.20 102,199.04 102,199.04 102,064.06 102,064.06 101,918.27 101,918.27 101,896.21 101,896.21 102,015.83 102,015.83 102,164.19 102,164.19
21 Concrete Pan Mixer Unit/Jam 270,824 580,000 271,556.38 581,569.28 271,930.75 582,371.02 271,938.31 582,387.24 271,579.15 581,618.05 271,191.23 580,787.26 271,132.52 580,661.53 271,450.81 581,343.19 271,845.59 582,188.66
22 Concrete Pump Unit/Jam 206,215 221,000 206,773.32 221,597.95 207,058.38 221,903.44 207,064.14 221,909.62 206,790.66 221,616.53 206,495.28 221,299.97 206,450.58 221,252.07 206,692.94 221,511.80 206,993.54 221,833.95
23 Concrete Vibrator Unit/Jam 76,999 76,999 77,207.21 77,207.21 77,313.64 77,313.64 77,315.80 77,315.80 77,213.68 77,213.68 77,103.39 77,103.39 77,086.70 77,086.70 77,177.19 77,177.19 77,289.43 77,289.43
24 Crane 10-15 Ton Unit/Jam 276,134 276,134 276,881.02 276,881.02 277,262.72 277,262.72 277,270.44 277,270.44 276,904.23 276,904.23 276,508.70 276,508.70 276,448.84 276,448.84 276,773.37 276,773.37 277,175.90 277,175.90
25 Crane On Track 35 Ton Unit/Jam 229,227 435,000 229,846.74 436,176.96 230,163.60 436,778.27 230,170.01 436,790.43 229,866.02 436,213.54 229,537.67 435,590.44 229,487.98 435,496.15 229,757.38 436,007.39 230,091.53 436,641.49
26 Crane On Track 75-100 Ton Unit/Jam 360,213 546,000 361,187.73 547,477.29 361,685.66 548,232.03 361,695.73 548,247.29 361,218.02 547,523.20 360,702.06 546,741.11 360,623.97 546,622.75 361,047.32 547,264.45 361,572.40 548,060.36
27 Dump Truck 10 Ton Unit/Jam 340,742 366,000 341,664.07 366,990.27 342,135.09 367,496.20 342,144.61 367,506.43 341,692.73 367,021.04 341,204.65 366,496.79 341,130.78 366,417.45 341,531.25 366,847.60 342,027.95 367,381.12
28 Dump Truck 3-4 M3 Unit/Jam 185,859 243,000 186,362.22 243,657.47 186,619.14 243,993.38 186,624.33 244,000.17 186,377.85 243,677.91 186,111.63 243,329.83 186,071.34 243,277.16 186,289.77 243,562.75 186,560.70 243,916.97
29 Excavator 80-140 HP Unit/Jam 269,054 427,000 269,781.50 428,155.31 270,153.42 428,745.56 270,160.94 428,757.50 269,804.13 428,191.22 269,418.73 427,579.58 269,360.41 427,487.02 269,676.62 427,988.86 270,068.82 428,611.30
30 Flat Bed Truck 3-4 M3 Unit/Jam 326,581 436,000 327,465.05 437,179.66 327,916.49 437,782.36 327,925.62 437,794.54 327,492.51 437,216.33 327,024.71 436,591.80 326,953.92 436,497.29 327,337.74 437,009.71 327,813.80 437,645.27
31 Fulvi Mixer Unit/Jam 817,781 1,277,000 819,993.78 1,280,455.12 821,124.21 1,282,220.34 821,147.07 1,282,256.03 820,062.54 1,280,562.50 818,891.15 1,278,733.32 818,713.88 1,278,456.51 819,674.99 1,279,957.33 820,867.08 1,281,818.82
32 Generator Set Unit/Jam 363,753 386,000 364,737.49 387,044.38 365,240.31 387,577.96 365,250.48 387,588.75 364,768.08 387,076.84 364,247.04 386,523.93 364,168.19 386,440.26 364,595.70 386,893.91 365,125.94 387,456.59
33 Hot Recycler Unit/Jam 2,671,949 7,835,000 2,679,178.80 7,856,198.79 2,682,872.29 7,867,029.26 2,682,946.97 7,867,248.26 2,679,403.47 7,856,857.60 2,675,576.18 7,845,634.76 2,674,996.98 7,843,936.38 2,678,137.24 7,853,144.60 2,682,032.16 7,864,565.74
34 Jack Hammer Unit/Jam 50,448 50,448 50,584.03 50,584.03 50,653.77 50,653.77 50,655.18 50,655.18 50,588.27 50,588.27 50,516.01 50,516.01 50,505.08 50,505.08 50,564.37 50,564.37 50,637.90 50,637.90
35 Launching Gantry Unit/Jam 64,200,245 64,200,245 64,373,948.67 64,373,948.67 64,462,693.85 64,462,693.85 64,464,488.33 64,464,488.33 64,379,346.97 64,379,346.97 64,287,386.67 64,287,386.67 64,273,470.09 64,273,470.09 64,348,922.52 64,348,922.52 64,442,507.72 64,442,507.72
36 Motor Grader > 100 HP Unit/Jam 252,238 424,000 252,920.16 425,147.20 253,268.83 425,733.30 253,275.88 425,745.15 252,941.37 425,182.85 252,580.06 424,575.51 252,525.39 424,483.60 252,821.83 424,981.92 253,189.52 425,599.98
37 Pedestrian Roller Unit/Jam 83,194 83,194 83,419.28 83,419.28 83,534.28 83,534.28 83,536.61 83,536.61 83,426.28 83,426.28 83,307.11 83,307.11 83,289.07 83,289.07 83,386.85 83,386.85 83,508.12 83,508.12
38 Pile Driver + Hammer Unit/Jam 94,700 277,000 94,955.99 277,749.47 95,086.89 278,132.37 95,089.54 278,140.11 94,963.95 277,772.76 94,828.30 277,375.98 94,807.78 277,315.94 94,919.07 277,641.49 95,057.12 278,045.27
39 Rock Drill Breaker Unit/Jam 92,045 299,000 92,293.67 299,808.99 92,420.91 300,222.30 92,423.48 300,230.66 92,301.41 299,834.13 92,169.57 299,405.84 92,149.61 299,341.03 92,257.79 299,692.44 92,391.97 300,128.29
40 Split Form Paver Unit/Jam 194,710 194,710 195,236.61 195,236.61 195,505.76 195,505.76 195,511.21 195,511.21 195,252.99 195,252.99 194,974.08 194,974.08 194,931.88 194,931.88 195,160.71 195,160.71 195,444.54 195,444.54
41 Stone Crusher Unit/Jam 521,291 650,000 522,701.66 651,758.67 523,422.25 652,657.18 523,436.82 652,675.35 522,745.49 651,813.33 521,998.80 650,882.27 521,885.80 650,741.37 522,498.45 651,505.30 523,258.34 652,452.81
42 Tamper Unit/Jam 77,884 77,884 78,094.65 78,094.65 78,202.31 78,202.31 78,204.48 78,204.48 78,101.19 78,101.19 77,989.63 77,989.63 77,972.75 77,972.75 78,064.29 78,064.29 78,177.82 78,177.82
43 Tandem Roller 6-8 T Unit/Jam 376,144 439,000 377,161.64 440,187.78 377,681.59 440,794.62 377,692.10 440,806.89 377,193.27 440,224.70 376,654.48 439,595.87 376,572.94 439,500.71 377,015.01 440,016.65 377,563.32 440,656.59
44 Three Wheel Roller 6-8 T Unit/Jam 124,791 158,000 125,128.92 158,427.49 125,301.42 158,645.90 125,304.91 158,650.32 125,139.41 158,440.78 124,960.66 158,214.46 124,933.61 158,180.21 125,080.28 158,365.90 125,262.18 158,596.22
45 Tire Roller 8-10 T Unit/Jam 223,031 403,000 223,634.67 404,090.38 223,942.97 404,647.45 223,949.20 404,658.72 223,653.42 404,124.26 223,333.95 403,547.01 223,285.60 403,459.65 223,547.73 403,933.28 223,872.84 404,520.74
46 Track Loader 75-100 HP Unit/Jam 208,871 275,000 209,435.64 275,744.05 209,724.37 276,124.19 209,730.20 276,131.88 209,453.20 275,767.18 209,154.02 275,373.27 209,108.74 275,313.66 209,354.22 275,636.86 209,658.69 276,037.73
47 Trailer 20 Ton Unit/Jam 337,202 466,000 338,114.32 467,260.83 338,580.44 467,904.99 338,589.86 467,918.02 338,142.67 467,300.02 337,659.66 466,632.52 337,586.57 466,531.51 337,982.87 467,079.18 338,474.41 467,758.47
48 Trailler 15 Ton Unit/Jam 292,065 444,000 292,854.92 445,201.31 293,258.65 445,815.06 293,266.81 445,827.47 292,879.48 445,238.64 292,461.13 444,602.66 292,397.82 444,506.41 292,741.07 445,028.23 293,166.81 445,675.45
49 Truck Mixer (agitator) Unit/Jam 367,293 540,000 368,287.25 541,461.05 368,794.96 542,207.50 368,805.23 542,222.60 368,318.13 541,506.46 367,792.02 540,732.96 367,712.40 540,615.91 368,144.07 541,250.55 368,679.48 542,037.72
50 Vibrating Rammer Unit/Jam 75,229 75,229 75,432.33 75,432.33 75,536.32 75,536.32 75,538.42 75,538.42 75,438.65 75,438.65 75,330.90 75,330.90 75,314.59 75,314.59 75,403.00 75,403.00 75,512.66 75,512.66
51 Vibratory Roller 5-8 T Unit/Jam 181,434 389,000 181,925.03 390,052.50 182,175.83 390,590.22 182,180.90 390,601.09 181,940.28 390,085.21 181,680.40 389,528.01 181,641.07 389,443.68 181,854.30 389,900.86 182,118.78 390,467.91
52 Water Pump 70-100 MM Unit/Jam 56,643 56,643 56,796.11 56,796.11 56,874.40 56,874.40 56,875.99 56,875.99 56,800.87 56,800.87 56,719.73 56,719.73 56,707.46 56,707.46 56,774.03 56,774.03 56,856.59 56,856.59
53 Water Tanker 3000-4500 L Unit/Jam 205,330 205,330 205,885.88 205,885.88 206,169.72 206,169.72 206,175.45 206,175.45 205,903.15 205,903.15 205,609.03 205,609.03 205,564.52 205,564.52 205,805.84 205,805.84 206,105.15 206,105.15
54 Welding Set Unit/Jam 115,056 115,056 115,367.09 115,367.09 115,526.13 115,526.13 115,529.35 115,529.35 115,376.76 115,376.76 115,211.96 115,211.96 115,187.02 115,187.02 115,322.24 115,322.24 115,489.96 115,489.96
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 200,020 319,000 200,561.25 319,863.10 200,837.74 320,304.06 200,843.33 320,312.98 200,578.07 319,889.93 200,291.56 319,432.99 200,248.20 319,363.84 200,483.28 319,738.75 200,774.85 320,203.76
HARGA SATUAN DASAR BAHAN KOTA BLITAR TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
2 Agregat Pecah Mesin 20-30 mm M3 266,000 266,000 266,719.70 266,719.70 267,087.40 267,087.40 267,094.84 267,094.84 266,742.07 266,742.07 266,361.05 266,361.05 266,303.39 266,303.39 266,616.01 266,616.01 267,003.76 267,003.76
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 304,000 304,000 304,822.52 304,822.52 305,242.74 305,242.74 305,251.24 305,251.24 304,848.08 304,848.08 304,412.63 304,412.63 304,346.73 304,346.73 304,704.02 304,704.02 305,147.16 305,147.16
4 Bahan Agr. Base Kelas A M3 292,000 292,000 292,790.05 292,790.05 293,193.69 293,193.69 293,201.85 293,201.85 292,814.60 292,814.60 292,396.34 292,396.34 292,333.05 292,333.05 292,676.23 292,676.23 293,101.88 293,101.88
5 Bahan Agr. Base Kelas B M3 274,000 274,000 274,741.35 274,741.35 275,120.10 275,120.10 275,127.76 275,127.76 274,764.39 274,764.39 274,371.91 274,371.91 274,312.52 274,312.52 274,634.54 274,634.54 275,033.95 275,033.95
6 Bahan Agr. Base Kelas C M3 252,000 252,000 252,681.82 252,681.82 253,030.17 253,030.17 253,037.21 253,037.21 252,703.01 252,703.01 252,342.05 252,342.05 252,287.42 252,287.42 252,583.59 252,583.59 252,950.93 252,950.93
7 Bahan Agr. Base Kelas C2 M3 230,000 230,000 230,622.30 230,622.30 230,940.23 230,940.23 230,946.66 230,946.66 230,641.64 230,641.64 230,312.19 230,312.19 230,262.33 230,262.33 230,532.64 230,532.64 230,867.92 230,867.92
8 Bahan Agr. Base Kelas S M3 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
9 Bahan Pilihan M3 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
10 Bahan Tanah Timbunan M3 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
11 Batu Belah/Kerakal M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
12 Batu Kali M3 331,000 331,000 331,895.57 331,895.57 332,353.12 332,353.12 332,362.37 332,362.37 331,923.40 331,923.40 331,449.28 331,449.28 331,377.53 331,377.53 331,766.54 331,766.54 332,249.04 332,249.04
13 Chipping M3 197,000 197,000 197,533.01 197,533.01 197,805.33 197,805.33 197,810.84 197,810.84 197,549.58 197,549.58 197,267.40 197,267.40 197,224.69 197,224.69 197,456.22 197,456.22 197,743.39 197,743.39
14 Chipping (kg) Kg 260 260 260.70 260.70 261.06 261.06 261.07 261.07 260.73 260.73 260.35 260.35 260.30 260.30 260.60 260.60 260.98 260.98
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 353,000 353,000 353,955.10 353,955.10 354,443.05 354,443.05 354,452.92 354,452.92 353,984.78 353,984.78 353,479.14 353,479.14 353,402.62 353,402.62 353,817.49 353,817.49 354,332.06 354,332.06
18 Kapur M3 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
19 Pasir Beton (Kasar) M3 420,000 420,000 421,136.37 421,136.37 421,716.95 421,716.95 421,728.69 421,728.69 421,171.69 421,171.69 420,570.08 420,570.08 420,479.04 420,479.04 420,972.65 420,972.65 421,584.89 421,584.89
20 Pasir Halus (untuk HRS) M3 266,000 266,000 266,719.70 266,719.70 267,087.40 267,087.40 267,094.84 267,094.84 266,742.07 266,742.07 266,361.05 266,361.05 266,303.39 266,303.39 266,616.01 266,616.01 267,003.76 267,003.76
21 Pasir Pasang (Sedang) M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
22 Pasir Urug M3 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
23 Pasir Urug (ada unsur lempung) M3 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
24 Sirtu M3 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
26 Anti Pengelupas Liter 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
27 Arbocell Kg 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
37 Assetilline Botol 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
40 Beton B-0 M3 522,176 522,176 523,589.10 523,589.10 524,310.91 524,310.91 524,325.51 524,325.51 523,633.01 523,633.01 522,885.04 522,885.04 522,771.85 522,771.85 523,385.55 523,385.55 524,146.73 524,146.73
41 Beton K-125 (fc' 10 MPa) M3 539,877 539,877 541,337.88 541,337.88 542,084.17 542,084.17 542,099.26 542,099.26 541,383.28 541,383.28 540,609.96 540,609.96 540,492.93 540,492.93 541,127.43 541,127.43 541,914.41 541,914.41
42 Beton K-175 (fc' 15 MPa) M3 584,129 584,129 585,709.84 585,709.84 586,517.29 586,517.29 586,533.62 586,533.62 585,758.96 585,758.96 584,922.25 584,922.25 584,795.63 584,795.63 585,482.14 585,482.14 586,333.63 586,333.63
43 Beton K-250 (fc' 20 MPa) M3 650,508 650,508 652,267.78 652,267.78 653,166.99 653,166.99 653,185.17 653,185.17 652,322.48 652,322.48 651,390.69 651,390.69 651,249.68 651,249.68 652,014.20 652,014.20 652,962.45 652,962.45
44 Beton K-300 (fc' 25 MPa) M3 677,059 677,059 678,890.95 678,890.95 679,826.86 679,826.86 679,845.79 679,845.79 678,947.88 678,947.88 677,978.06 677,978.06 677,831.30 677,831.30 678,627.02 678,627.02 679,613.98 679,613.98
45 Beton K-350 (fc' 30 MPa) M3 703,610 703,610 705,514.13 705,514.13 706,486.74 706,486.74 706,506.41 706,506.41 705,573.29 705,573.29 704,565.44 704,565.44 704,412.92 704,412.92 705,239.85 705,239.85 706,265.51 706,265.51
46 Beton K-400 (fc' 35 MPa) M3 730,162 730,162 732,137.30 732,137.30 733,146.62 733,146.62 733,167.03 733,167.03 732,198.70 732,198.70 731,152.81 731,152.81 730,994.54 730,994.54 731,852.67 731,852.67 732,917.04 732,917.04
47 Beton K-450 (fc' 40 MPa) M3 765,564 765,564 767,634.87 767,634.87 768,693.12 768,693.12 768,714.52 768,714.52 767,699.24 767,699.24 766,602.65 766,602.65 766,436.70 766,436.70 767,336.44 767,336.44 768,452.41 768,452.41
48 Beton K-500 (fc' 45 MPa) M3 796,540 796,540 798,695.24 798,695.24 799,796.31 799,796.31 799,818.57 799,818.57 798,762.21 798,762.21 797,621.25 797,621.25 797,448.59 797,448.59 798,384.73 798,384.73 799,545.86 799,545.86
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
51 Cat Anti Karat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
52 Cat Marka (Non Thermoplas) Kg 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
53 Cat Marka (Thermoplastic) Kg 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
54 Cerucuk Diameter 10-15 cm M' 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,155,000 1,155,000 1,158,125.03 1,158,125.03 1,159,721.61 1,159,721.61 1,159,753.89 1,159,753.89 1,158,222.15 1,158,222.15 1,156,567.73 1,156,567.73 1,156,317.36 1,156,317.36 1,157,674.79 1,157,674.79 1,159,358.45 1,159,358.45
57 Curing Compound Liter 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 540,000 540,000 541,461.05 541,461.05 542,207.50 542,207.50 542,222.60 542,222.60 541,506.46 541,506.46 540,732.96 540,732.96 540,615.91 540,615.91 541,250.55 541,250.55 542,037.72 542,037.72
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 628,000 628,000 629,699.15 629,699.15 630,567.25 630,567.25 630,584.80 630,584.80 629,751.96 629,751.96 628,852.41 628,852.41 628,716.28 628,716.28 629,454.35 629,454.35 630,369.79 630,369.79
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 797,000 797,000 799,156.41 799,156.41 800,258.11 800,258.11 800,280.39 800,280.39 799,223.42 799,223.42 798,081.80 798,081.80 797,909.04 797,909.04 798,845.72 798,845.72 800,007.52 800,007.52
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
64 Oxygen (Isi 6 M3) Botol 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
65 Polytene 125 Mikron Kg 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
66 Sand Sheet Ton 1,221,000 1,221,000 1,224,303.60 1,224,303.60 1,225,991.41 1,225,991.41 1,226,025.54 1,226,025.54 1,224,406.27 1,224,406.27 1,222,657.31 1,222,657.31 1,222,392.64 1,222,392.64 1,223,827.64 1,223,827.64 1,225,607.50 1,225,607.50
67 Seal Coat M2 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
68 Seal Guard Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
69 Semen/PC (50 kg) Zak 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
77 Baja Tulangan (Polos) U25 Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
78 Baja Tulangan (Polos) U32 Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
84 Baja Tulangan (Ulir) D36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,506,000 11,506,000 11,537,131.25 11,537,131.25 11,553,036.20 11,553,036.20 11,553,357.81 11,553,357.81 11,538,098.73 11,538,098.73 11,521,617.56 11,521,617.56 11,519,123.43 11,519,123.43 11,532,646.05 11,532,646.05 11,549,418.43 11,549,418.43
87 Box Culvert Type DUB 200×200 M' 12,214,000 12,214,000 12,247,046.85 12,247,046.85 12,263,930.49 12,263,930.49 12,264,271.88 12,264,271.88 12,248,073.87 12,248,073.87 12,230,578.56 12,230,578.56 12,227,930.95 12,227,930.95 12,242,285.66 12,242,285.66 12,260,090.11 12,260,090.11
88 Box Culvert Type uk 300×200 M' 13,187,000 13,187,000 13,222,679.45 13,222,679.45 13,240,908.08 13,240,908.08 13,241,276.68 13,241,276.68 13,223,788.28 13,223,788.28 13,204,899.25 13,204,899.25 13,202,040.73 13,202,040.73 13,217,538.97 13,217,538.97 13,236,761.77 13,236,761.77
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
91 Ducting (Strand Prestress) M' 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 1,926,000 1,926,000 1,931,211.09 1,931,211.09 1,933,873.43 1,933,873.43 1,933,927.27 1,933,927.27 1,931,373.04 1,931,373.04 1,928,614.24 1,928,614.24 1,928,196.74 1,928,196.74 1,930,460.31 1,930,460.31 1,933,267.85 1,933,267.85
94 Expansion Join Tipe Rubber M' 1,394,000 1,394,000 1,397,771.68 1,397,771.68 1,399,698.63 1,399,698.63 1,399,737.60 1,399,737.60 1,397,888.90 1,397,888.90 1,395,892.13 1,395,892.13 1,395,589.96 1,395,589.96 1,397,228.28 1,397,228.28 1,399,260.32 1,399,260.32
95 Expansion Join Tipe Torma M' 1,599,000 1,599,000 1,603,326.34 1,603,326.34 1,605,536.67 1,605,536.67 1,605,581.36 1,605,581.36 1,603,460.79 1,603,460.79 1,601,170.39 1,601,170.39 1,600,823.78 1,600,823.78 1,602,703.03 1,602,703.03 1,605,033.90 1,605,033.90
96 Expansion Tipe Joint Asphaltic Plug M' 1,897,000 1,897,000 1,902,132.62 1,902,132.62 1,904,754.88 1,904,754.88 1,904,807.91 1,904,807.91 1,902,292.13 1,902,292.13 1,899,574.88 1,899,574.88 1,899,163.67 1,899,163.67 1,901,393.15 1,901,393.15 1,904,158.42 1,904,158.42
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
99 Glass Bead Kg 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
100 Joint Sealent Kg 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
101 Joint Socket Pile 16×16×16 Set 81,000 81,000 81,219.16 81,219.16 81,331.13 81,331.13 81,333.39 81,333.39 81,225.97 81,225.97 81,109.94 81,109.94 81,092.39 81,092.39 81,187.58 81,187.58 81,305.66 81,305.66
102 Joint Socket Pile 35×35 Set 692,000 692,000 693,872.31 693,872.31 694,828.88 694,828.88 694,848.22 694,848.22 693,930.50 693,930.50 692,939.28 692,939.28 692,789.28 692,789.28 693,602.56 693,602.56 694,611.29 694,611.29
103 Kawat Beton Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
104 Kawat Bronjong Kg 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
105 Kawat Las Dos 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
106 Kayu Acuan (Kelas III/Meranti) M3 3,806,000 3,806,000 3,816,297.72 3,816,297.72 3,821,558.82 3,821,558.82 3,821,665.20 3,821,665.20 3,816,617.75 3,816,617.75 3,811,166.04 3,811,166.04 3,810,341.02 3,810,341.02 3,814,814.08 3,814,814.08 3,820,362.12 3,820,362.12
107 Kayu Perancah (Gelam) M3 2,452,000 2,452,000 2,458,634.26 2,458,634.26 2,462,023.71 2,462,023.71 2,462,092.24 2,462,092.24 2,458,840.44 2,458,840.44 2,455,328.20 2,455,328.20 2,454,796.68 2,454,796.68 2,457,678.44 2,457,678.44 2,461,252.74 2,461,252.74
108 Kerb Pracetak Type 1 (Peninggi) Buah 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
110 Marmer Nama Jembatan Buah 531,000 531,000 532,436.70 532,436.70 533,170.71 533,170.71 533,185.56 533,185.56 532,481.35 532,481.35 531,720.75 531,720.75 531,605.64 531,605.64 532,229.71 532,229.71 533,003.75 533,003.75
111 Mata Kucing Buah 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
112 Matras Concrete (Tebal=10 cm) M2 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
113 Mini Pile 16×16×16 M' 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
114 Mini Timber Pile Buah 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
115 Multipleks 12 mm Lbr 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
116 Paku Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
117 Paving Block (Model Bata 8 cm) M2 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 58,836,000 58,836,000 58,995,189.82 58,995,189.82 59,076,519.91 59,076,519.91 59,078,164.45 59,078,164.45 59,000,137.07 59,000,137.07 58,915,860.50 58,915,860.50 58,903,106.72 58,903,106.72 58,972,254.73 58,972,254.73 59,058,020.42 59,058,020.42
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 83,351,000 83,351,000 83,576,518.91 83,576,518.91 83,691,736.53 83,691,736.53 83,694,066.30 83,694,066.30 83,583,527.51 83,583,527.51 83,464,135.71 83,464,135.71 83,446,067.85 83,446,067.85 83,544,027.53 83,544,027.53 83,665,528.93 83,665,528.93
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 159,308,000 159,308,000 159,739,032.21 159,739,032.21 159,959,246.60 159,959,246.60 159,963,699.47 159,963,699.47 159,752,427.70 159,752,427.70 159,524,235.24 159,524,235.24 159,489,702.31 159,489,702.31 159,676,931.75 159,676,931.75 159,909,156.26 159,909,156.26
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 208,907,000 208,907,000 209,472,229.91 209,472,229.91 209,761,005.91 209,761,005.91 209,766,845.14 209,766,845.14 209,489,795.95 209,489,795.95 209,190,557.98 209,190,557.98 209,145,273.56 209,145,273.56 209,390,795.07 209,390,795.07 209,695,320.42 209,695,320.42
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 266,301,000 266,301,000 267,021,518.18 267,021,518.18 267,389,630.97 267,389,630.97 267,397,074.43 267,397,074.43 267,043,910.21 267,043,910.21 266,662,461.19 266,662,461.19 266,604,735.58 266,604,735.58 266,917,710.36 266,917,710.36 267,305,899.39 267,305,899.39
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 321,292,000 321,292,000 322,161,304.76 322,161,304.76 322,605,432.62 322,605,432.62 322,614,413.15 322,614,413.15 322,188,320.74 322,188,320.74 321,728,102.71 321,728,102.71 321,658,456.80 321,658,456.80 322,036,060.68 322,036,060.68 322,504,410.52 322,504,410.52
124 Pelat Rambu (Eng. Grade) Buah 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
125 Pelat Rambu (High L Grade) Buah 217,000 217,000 217,587.13 217,587.13 217,887.09 217,887.09 217,893.16 217,893.16 217,605.37 217,605.37 217,294.54 217,294.54 217,247.50 217,247.50 217,502.54 217,502.54 217,818.86 217,818.86
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
128 Pipa Drainase Baja Dia 3" M' 244,000 244,000 244,660.18 244,660.18 244,997.47 244,997.47 245,004.29 245,004.29 244,680.70 244,680.70 244,331.19 244,331.19 244,278.30 244,278.30 244,565.06 244,565.06 244,920.75 244,920.75
129 Pipa Galvanis Dia 1,5" M' 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
130 Pipa Galvanis Dia 2" M' 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
131 Pipa Galvanis Dia 3" M' 214,000 214,000 214,579.01 214,579.01 214,874.83 214,874.83 214,880.81 214,880.81 214,597.00 214,597.00 214,290.47 214,290.47 214,244.08 214,244.08 214,495.59 214,495.59 214,807.54 214,807.54
132 Pipa Porus M' 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
133 Pipa PVC Dia 4" M' 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79 155,358.96 155,358.96 155,584.90 155,584.90
134 Plastik Filter M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
135 Rel Pengaman M' 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,818,000 1,818,000 1,822,918.88 1,822,918.88 1,825,431.93 1,825,431.93 1,825,482.75 1,825,482.75 1,823,071.75 1,823,071.75 1,820,467.65 1,820,467.65 1,820,073.56 1,820,073.56 1,822,210.20 1,822,210.20 1,824,860.31 1,824,860.31
137 Strip Bearing Buah 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
138 Tiang Pancang Baja Diameter 400 M' 644,000 644,000 645,742.44 645,742.44 646,632.65 646,632.65 646,650.65 646,650.65 645,796.59 645,796.59 644,874.13 644,874.13 644,734.53 644,734.53 645,491.40 645,491.40 646,430.16 646,430.16
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 787,000 787,000 789,129.35 789,129.35 790,217.23 790,217.23 790,239.23 790,239.23 789,195.52 789,195.52 788,068.23 788,068.23 787,897.63 787,897.63 788,822.57 788,822.57 789,969.78 789,969.78
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,646,000 1,646,000 1,650,453.51 1,650,453.51 1,652,728.80 1,652,728.80 1,652,774.81 1,652,774.81 1,650,591.91 1,650,591.91 1,648,234.18 1,648,234.18 1,647,877.38 1,647,877.38 1,649,811.87 1,649,811.87 1,652,211.26 1,652,211.26
HARGA SATUAN DASAR UPAH KOTA BLITAR TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 106,274.35
2 Tukang OH 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 119,307.99
3 Mandor OH 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 137,354.58
4 Operator OH 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 283,732.45
5 Pembantu Operator OH 177,737.23 177,737.23 177,557.60 177,557.60 177,299.31 177,299.31 177,201.86 177,201.86 177,351.95 177,351.95 177,606.54 177,606.54 177,729.05 177,729.05 177,458.11 177,458.11
6 Sopir OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23
7 Pembantu Sopir OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
8 Mekanik OH 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 159,411.52
9 Pembantu Mekanik OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
10 Kepala Tukang OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23
11 Pemasak Aspal OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23

HARGA SATUAN DASAR ALAT KOTA BLITAR TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 418,592.24 467,940.96 418,169.19 467,468.03 417,560.89 466,788.02 417,331.38 466,531.45 417,684.86 466,926.61 418,284.46 467,596.89 418,572.97 467,919.42 417,934.87 850,306.05
2 Asphalt Distribution Unit/Jam 257,731.95 331,374.50 257,471.47 331,039.59 257,096.94 330,558.04 256,955.63 330,376.35 257,173.27 330,656.18 257,542.45 331,130.84 257,720.09 331,359.25 257,327.20 566,733.06
3 Asphalt Finisher Unit/Jam 189,299.68 897,723.64 189,108.36 896,816.35 188,833.27 895,511.78 188,729.48 895,019.57 188,889.33 895,777.66 189,160.49 897,063.56 189,290.96 897,682.32 189,002.39 1,069,562.86
4 Asphalt Liquid Mixer Unit/Jam 67,543.55 123,512.31 67,475.28 123,387.48 67,377.13 123,208.00 67,340.10 123,140.28 67,397.13 123,244.58 67,493.88 123,421.50 67,540.44 123,506.63 67,437.47 185,134.90
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 90,650.55 90,650.55 90,558.93 90,558.93 90,427.20 90,427.20 90,377.50 90,377.50 90,454.05 90,454.05 90,583.89 90,583.89 90,646.38 90,646.38 90,508.19 173,472.51
6 Asphalt Mixing Plant Unit/Jam 1,013,153.19 5,196,941.76 1,012,129.24 5,191,689.43 1,010,656.92 5,184,137.21 1,010,101.43 5,181,287.80 1,010,957.00 5,185,676.42 1,012,408.24 5,193,120.53 1,013,106.56 5,196,702.53 1,011,562.11 6,116,028.63
7 Asphalt Sprayer Unit/Jam 83,540.70 83,540.70 83,456.27 83,456.27 83,334.87 83,334.87 83,289.07 83,289.07 83,359.61 83,359.61 83,479.28 83,479.28 83,536.86 83,536.86 83,409.51 159,866.82
8 Asphalt Tanker Unit/Jam 391,041.58 452,878.48 390,646.37 452,420.78 390,078.11 451,762.65 389,863.71 451,514.35 390,193.93 451,896.78 390,754.06 452,545.49 391,023.58 452,857.64 390,427.48 810,052.58
9 Blending Equipment Unit/Jam 127,088.51 200,833.03 126,960.07 200,630.06 126,775.39 200,338.20 126,705.71 200,228.09 126,813.03 200,397.69 126,995.07 200,685.36 127,082.66 200,823.79 126,888.93 316,830.36
10 Bore Pile Machine Unit/Jam 350,159.96 608,524.08 349,806.07 607,909.07 349,297.22 607,024.76 349,105.23 606,691.12 349,400.93 607,204.99 349,902.50 608,076.64 350,143.85 608,496.07 349,610.06 928,038.47
11 Bore Pile Machine Dia 60 Unit/Jam 229,292.57 692,873.95 229,060.83 692,173.70 228,727.62 691,166.81 228,601.90 690,786.91 228,795.53 691,372.02 229,123.97 692,364.49 229,282.01 692,842.06 228,932.48 901,636.78
12 Bore Pile Machine Dia 80 Unit/Jam 906,505.49 906,505.49 905,589.32 905,589.32 904,271.98 904,271.98 903,774.96 903,774.96 904,540.47 904,540.47 905,838.95 905,838.95 906,463.76 906,463.76 905,081.88 1,734,725.11
13 Bulldozer 100-150 HP Unit/Jam 355,492.35 515,136.72 355,133.07 514,616.10 354,616.46 513,867.50 354,421.55 513,585.05 354,721.75 514,020.07 355,230.96 514,757.95 355,475.98 515,113.01 354,934.07 839,678.02
14 Cement Tanker Unit/Jam 330,607.88 426,770.19 330,273.75 426,338.87 329,793.31 425,718.69 329,612.04 425,484.69 329,891.23 425,845.08 330,364.79 426,456.39 330,592.67 426,750.54 330,088.69 728,675.74
15 Cold Milling Unit/Jam 516,352.64 1,098,556.67 515,830.78 1,097,446.41 515,080.41 1,095,849.98 514,797.31 1,095,247.66 515,233.35 1,096,175.35 515,972.97 1,097,748.92 516,328.87 1,098,506.11 515,541.74 1,569,402.76
16 Cold Recycler Unit/Jam 4,348,560.16 4,348,560.16 4,344,165.25 4,344,165.25 4,337,845.90 4,337,845.90 4,335,461.65 4,335,461.65 4,339,133.84 4,339,133.84 4,345,362.73 4,345,362.73 4,348,359.98 4,348,359.98 4,341,731.04 8,321,578.41
17 Compressor 4000-6500 L\M Unit/Jam 132,420.90 132,420.90 132,287.07 132,287.07 132,094.63 132,094.63 132,022.03 132,022.03 132,133.85 132,133.85 132,323.53 132,323.53 132,414.80 132,414.80 132,212.94 253,405.92
18 Concrete Breaker Unit/Jam 482,580.86 919,815.28 482,093.14 918,885.66 481,391.85 917,548.98 481,127.26 917,044.66 481,534.78 917,821.41 482,226.03 919,138.95 482,558.65 919,772.94 481,823.00 1,360,033.78
19 Concrete Mixer (350) Unit/Jam 89,761.82 89,761.82 89,671.10 89,671.10 89,540.66 89,540.66 89,491.44 89,491.44 89,567.24 89,567.24 89,695.82 89,695.82 89,757.69 89,757.69 89,620.85 171,771.80
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 102,204.05 102,204.05 102,100.76 102,100.76 101,952.23 101,952.23 101,896.20 101,896.20 101,982.50 101,982.50 102,128.90 102,128.90 102,199.35 102,199.35 102,043.55 195,581.75
21 Concrete Pan Mixer Unit/Jam 271,951.65 582,415.79 271,676.80 581,827.16 271,281.60 580,980.79 271,132.49 580,661.46 271,362.14 581,153.29 271,751.68 581,987.55 271,939.13 582,388.98 271,524.57 830,394.11
22 Concrete Pump Unit/Jam 207,074.29 221,920.50 206,865.01 221,696.21 206,564.09 221,373.72 206,450.55 221,252.04 206,625.42 221,439.44 206,922.03 221,757.32 207,064.76 221,910.28 206,749.10 411,088.53
23 Concrete Vibrator Unit/Jam 77,319.59 77,319.59 77,241.44 77,241.44 77,129.08 77,129.08 77,086.69 77,086.69 77,151.98 77,151.98 77,262.73 77,262.73 77,316.03 77,316.03 77,198.16 147,961.85
24 Crane 10-15 Ton Unit/Jam 277,284.03 277,284.03 277,003.79 277,003.79 276,600.84 276,600.84 276,448.81 276,448.81 276,682.97 276,682.97 277,080.15 277,080.15 277,271.27 277,271.27 276,848.58 530,621.80
25 Crane On Track 35 Ton Unit/Jam 230,181.30 436,811.84 229,948.66 436,370.37 229,614.16 435,735.60 229,487.96 435,496.10 229,682.33 435,864.97 230,012.05 436,490.66 230,170.70 436,791.73 229,819.81 646,790.17
26 Crane On Track 75-100 Ton Unit/Jam 361,713.47 548,274.17 361,347.90 547,720.05 360,822.25 546,923.30 360,623.93 546,622.69 360,929.38 547,085.69 361,447.50 547,871.03 361,696.81 548,248.93 361,145.42 878,457.06
27 Dump Truck 10 Ton Unit/Jam 342,161.39 367,524.45 341,815.58 367,153.00 341,318.35 366,618.92 341,130.75 366,417.41 341,419.69 366,727.77 341,909.80 367,254.21 342,145.64 367,507.53 341,624.04 680,096.92
28 Dump Truck 3-4 M3 Unit/Jam 186,633.48 244,012.13 186,444.86 243,765.52 186,173.64 243,410.92 186,071.32 243,277.13 186,228.92 243,483.19 186,496.25 243,832.71 186,624.89 244,000.90 186,340.39 414,437.83
29 Excavator 80-140 HP Unit/Jam 270,174.19 428,778.52 269,901.13 428,345.17 269,508.51 427,722.07 269,360.38 427,486.97 269,588.53 427,849.06 269,975.53 428,463.24 270,161.75 428,758.78 269,749.89 675,371.37
30 Flat Bed Truck 3-4 M3 Unit/Jam 327,941.69 437,816.01 327,610.26 437,373.52 327,133.69 436,737.29 326,953.88 436,497.24 327,230.82 436,866.96 327,700.56 437,494.09 327,926.60 437,795.85 327,426.68 737,264.08
31 Fulvi Mixer Unit/Jam 821,187.33 1,282,318.90 820,357.39 1,281,022.91 819,164.03 1,279,159.44 818,713.79 1,278,456.36 819,407.25 1,279,539.23 820,583.52 1,281,376.03 821,149.53 1,282,259.87 819,897.71 2,031,864.26
32 Generator Set Unit/Jam 365,268.39 387,607.75 364,899.23 387,216.01 364,368.42 386,652.74 364,168.15 386,440.22 364,476.60 386,767.54 364,999.81 387,322.75 365,251.57 387,589.91 364,694.76 721,296.46
33 Hot Recycler Unit/Jam 2,683,078.50 7,867,633.96 2,680,366.83 7,859,682.47 2,676,467.76 7,848,249.18 2,674,996.67 7,843,935.47 2,677,262.43 7,850,579.38 2,681,105.68 7,861,849.00 2,682,955.00 7,867,271.79 2,678,864.91 10,310,859.65
34 Jack Hammer Unit/Jam 50,657.66 50,657.66 50,606.46 50,606.46 50,532.85 50,532.85 50,505.07 50,505.07 50,547.85 50,547.85 50,620.41 50,620.41 50,655.33 50,655.33 50,578.11 96,940.52
35 Launching Gantry Unit/Jam 64,467,648.76 64,467,648.76 64,402,494.02 64,402,494.02 64,308,809.26 64,308,809.26 64,273,462.63 64,273,462.63 64,327,903.05 64,327,903.05 64,420,246.63 64,420,246.63 64,464,681.16 64,464,681.16 64,366,406.62 123,367,867.67
36 Motor Grader > 100 HP Unit/Jam 253,288.30 425,766.02 253,032.31 425,335.72 252,664.23 424,716.99 252,525.36 424,483.55 252,739.25 424,843.10 253,102.06 425,452.96 253,276.64 425,746.42 252,890.53 656,909.47
37 Pedestrian Roller Unit/Jam 83,540.70 83,540.70 83,456.27 83,456.27 83,334.87 83,334.87 83,289.07 83,289.07 83,359.61 83,359.61 83,479.28 83,479.28 83,536.86 83,536.86 83,409.51 159,866.82
38 Pile Driver + Hammer Unit/Jam 95,094.20 278,153.75 94,998.10 277,872.63 94,859.90 277,468.41 94,807.77 277,315.91 94,888.07 277,550.80 95,024.28 277,949.22 95,089.83 278,140.94 94,944.86 364,748.13
39 Rock Drill Breaker Unit/Jam 92,428.01 300,245.38 92,334.60 299,941.93 92,200.28 299,505.62 92,149.60 299,341.00 92,227.66 299,594.54 92,360.05 300,024.61 92,423.76 300,231.56 92,282.86 384,364.94
40 Split Form Paver Unit/Jam 195,520.79 195,520.79 195,323.19 195,323.19 195,039.06 195,039.06 194,931.85 194,931.85 195,096.96 195,096.96 195,377.03 195,377.03 195,511.79 195,511.79 195,213.74 374,156.40
41 Stone Crusher Unit/Jam 523,462.48 652,707.35 522,933.44 652,047.68 522,172.74 651,099.17 521,885.74 650,741.30 522,327.78 651,292.48 523,077.59 652,227.42 523,438.39 652,677.30 522,640.42 1,130,760.61
42 Tamper Unit/Jam 78,208.32 78,208.32 78,129.27 78,129.27 78,015.62 78,015.62 77,972.74 77,972.74 78,038.79 78,038.79 78,150.81 78,150.81 78,204.72 78,204.72 78,085.50 149,662.56
43 Tandem Roller 6-8 T Unit/Jam 377,710.62 440,828.50 377,328.88 440,382.97 376,779.99 439,742.36 376,572.90 439,500.66 376,891.86 439,872.92 377,432.90 440,504.37 377,693.23 440,808.21 377,117.45 785,820.89
44 Three Wheel Roller 6-8 T Unit/Jam 125,311.05 158,658.09 125,184.41 158,497.74 125,002.30 158,267.18 124,933.60 158,180.19 125,039.42 158,314.17 125,218.91 158,541.43 125,305.28 158,650.79 125,114.26 273,094.91
45 Tire Roller 8-10 T Unit/Jam 223,960.18 404,678.56 223,733.83 404,269.56 223,408.37 403,681.48 223,285.58 403,459.60 223,474.70 403,801.34 223,795.51 404,381.00 223,949.87 404,659.93 223,608.47 609,013.72
46 Track Loader 75-100 HP Unit/Jam 209,740.49 276,145.42 209,528.51 275,866.33 209,223.71 275,465.03 209,108.72 275,313.63 209,285.83 275,546.82 209,586.27 275,942.37 209,730.83 276,132.70 209,411.10 467,668.42
47 Trailer 20 Ton Unit/Jam 338,606.46 467,940.96 338,264.25 467,468.03 337,772.18 466,788.02 337,586.53 466,531.45 337,872.47 466,926.61 338,357.49 467,596.89 338,590.88 467,919.42 338,074.70 777,102.24
48 Trailler 15 Ton Unit/Jam 293,281.19 445,849.33 292,984.78 445,398.73 292,558.58 444,750.81 292,397.78 444,506.36 292,645.45 444,882.86 293,065.54 445,521.50 293,267.69 445,828.80 292,820.61 713,563.14
49 Truck Mixer (agitator) Unit/Jam 368,823.31 542,249.18 368,450.56 541,701.15 367,914.58 540,913.15 367,712.36 540,615.85 368,023.82 541,073.75 368,552.12 541,850.47 368,806.33 542,224.22 368,244.10 878,948.54
50 Vibrating Rammer Unit/Jam 75,542.12 75,542.12 75,465.78 75,465.78 75,356.00 75,356.00 75,314.58 75,314.58 75,378.37 75,378.37 75,486.58 75,486.58 75,538.65 75,538.65 75,423.49 144,560.43
51 Vibratory Roller 5-8 T Unit/Jam 182,189.83 390,620.24 182,005.70 390,225.46 181,740.94 389,657.81 181,641.05 389,443.64 181,794.90 389,773.50 182,055.87 390,333.03 182,181.44 390,602.26 181,903.71 556,748.82
52 Water Pump 70-100 MM Unit/Jam 56,878.78 56,878.78 56,821.29 56,821.29 56,738.63 56,738.63 56,707.45 56,707.45 56,755.48 56,755.48 56,836.95 56,836.95 56,876.16 56,876.16 56,789.45 108,845.50
53 Water Tanker 3000-4500 L Unit/Jam 206,185.56 206,185.56 205,977.18 205,977.18 205,677.55 205,677.55 205,564.50 205,564.50 205,738.62 205,738.62 206,033.96 206,033.96 206,176.07 206,176.07 205,861.76 394,564.93
54 Welding Set Unit/Jam 115,535.01 115,535.01 115,418.25 115,418.25 115,250.35 115,250.35 115,187.00 115,187.00 115,284.57 115,284.57 115,450.06 115,450.06 115,529.70 115,529.70 115,353.57 221,092.42
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 200,853.18 320,328.68 200,650.18 320,004.94 200,358.30 319,539.44 200,248.18 319,363.81 200,417.79 319,634.31 200,705.49 320,093.15 200,843.93 320,313.94 200,537.75 503,648.54
HARGA SATUAN DASAR BAHAN KOTA BLITAR TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
2 Agregat Pecah Mesin 20-30 mm M3 267,107.93 267,107.93 266,837.98 266,837.98 266,449.81 266,449.81 266,303.36 266,303.36 266,528.92 266,528.92 266,911.53 266,911.53 267,095.63 267,095.63 266,688.45 511,148.40
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 305,266.21 305,266.21 304,957.69 304,957.69 304,514.07 304,514.07 304,346.70 304,346.70 304,604.48 304,604.48 305,041.75 305,041.75 305,252.15 305,252.15 304,786.81 584,169.60
4 Bahan Agr. Base Kelas A M3 293,216.22 293,216.22 292,919.88 292,919.88 292,493.78 292,493.78 292,333.01 292,333.01 292,580.62 292,580.62 293,000.63 293,000.63 293,202.73 293,202.73 292,755.75 561,110.28
5 Bahan Agr. Base Kelas B M3 275,141.25 275,141.25 274,863.18 274,863.18 274,463.34 274,463.34 274,312.49 274,312.49 274,544.83 274,544.83 274,938.94 274,938.94 275,128.59 275,128.59 274,709.16 526,521.29
6 Bahan Agr. Base Kelas C M3 253,049.62 253,049.62 252,793.87 252,793.87 252,426.14 252,426.14 252,287.39 252,287.39 252,501.09 252,501.09 252,863.55 252,863.55 253,037.97 253,037.97 252,652.22 484,245.86
7 Bahan Agr. Base Kelas C2 M3 230,957.98 230,957.98 230,724.57 230,724.57 230,388.94 230,388.94 230,262.30 230,262.30 230,457.34 230,457.34 230,788.16 230,788.16 230,947.35 230,947.35 230,595.28 441,970.42
8 Bahan Agr. Base Kelas S M3 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
9 Bahan Pilihan M3 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
10 Bahan Tanah Timbunan M3 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 203,690.72
11 Batu Belah/Kerakal M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
12 Batu Kali M3 332,378.66 332,378.66 332,042.74 332,042.74 331,559.73 331,559.73 331,377.49 331,377.49 331,658.17 331,658.17 332,134.27 332,134.27 332,363.36 332,363.36 331,856.69 636,053.09
13 Chipping M3 197,820.53 197,820.53 197,620.61 197,620.61 197,333.13 197,333.13 197,224.67 197,224.67 197,391.72 197,391.72 197,675.08 197,675.08 197,811.43 197,811.43 197,509.87 378,557.28
14 Chipping (kg) Kg 261.08 261.08 260.82 260.82 260.44 260.44 260.30 260.30 260.52 260.52 260.89 260.89 261.07 261.07 260.67 499.62
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 354,470.30 354,470.30 354,112.05 354,112.05 353,596.93 353,596.93 353,402.58 353,402.58 353,701.92 353,701.92 354,209.66 354,209.66 354,453.98 354,453.98 353,913.63 678,328.52
18 Kapur M3 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
19 Pasir Beton (Kasar) M3 421,749.36 421,749.36 421,323.12 421,323.12 420,710.23 420,710.23 420,478.99 420,478.99 420,835.14 420,835.14 421,439.26 421,439.26 421,729.95 421,729.95 421,087.03 807,076.43
20 Pasir Halus (untuk HRS) M3 267,107.93 267,107.93 266,837.98 266,837.98 266,449.81 266,449.81 266,303.36 266,303.36 266,528.92 266,528.92 266,911.53 266,911.53 267,095.63 267,095.63 266,688.45 511,148.40
21 Pasir Pasang (Sedang) M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
22 Pasir Urug M3 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
23 Pasir Urug (ada unsur lempung) M3 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 272,868.70
24 Sirtu M3 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
26 Anti Pengelupas Liter 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
27 Arbocell Kg 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 242,122.93
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
37 Assetilline Botol 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
40 Beton B-0 M3 524,351.21 524,351.21 523,821.28 523,821.28 523,059.28 523,059.28 522,771.79 522,771.79 523,214.59 523,214.59 523,965.67 523,965.67 524,327.08 524,327.08 523,527.76 1,003,419.43
41 Beton K-125 (fc' 10 MPa) M3 542,125.83 542,125.83 541,577.93 541,577.93 540,790.11 540,790.11 540,492.87 540,492.87 540,950.67 540,950.67 541,727.21 541,727.21 542,100.88 542,100.88 541,274.46 1,037,433.65
42 Beton K-175 (fc' 15 MPa) M3 586,562.38 586,562.38 585,969.56 585,969.56 585,117.17 585,117.17 584,795.56 584,795.56 585,290.89 585,290.89 586,131.09 586,131.09 586,535.38 586,535.38 585,641.22 1,122,469.19
43 Beton K-250 (fc' 20 MPa) M3 653,217.19 653,217.19 652,557.01 652,557.01 651,607.75 651,607.75 651,249.60 651,249.60 651,801.22 651,801.22 652,736.89 652,736.89 653,187.12 653,187.12 652,191.36 1,250,022.51
44 Beton K-300 (fc' 25 MPa) M3 679,879.12 679,879.12 679,191.99 679,191.99 678,203.99 678,203.99 677,831.22 677,831.22 678,405.35 678,405.35 679,379.21 679,379.21 679,847.82 679,847.82 678,811.41 1,301,043.84
45 Beton K-350 (fc' 30 MPa) M3 706,541.04 706,541.04 705,826.97 705,826.97 704,800.22 704,800.22 704,412.84 704,412.84 705,009.48 705,009.48 706,021.53 706,021.53 706,508.52 706,508.52 705,431.47 1,352,065.16
46 Beton K-400 (fc' 35 MPa) M3 733,202.97 733,202.97 732,461.95 732,461.95 731,396.46 731,396.46 730,994.45 730,994.45 731,613.61 731,613.61 732,663.86 732,663.86 733,169.22 733,169.22 732,051.52 1,403,086.49
47 Beton K-450 (fc' 40 MPa) M3 768,752.20 768,752.20 767,975.26 767,975.26 766,858.10 766,858.10 766,436.61 766,436.61 767,085.79 767,085.79 768,186.95 768,186.95 768,716.82 768,716.82 767,544.93 1,471,114.92
48 Beton K-500 (fc' 45 MPa) M3 799,857.79 799,857.79 799,049.40 799,049.40 797,887.04 797,887.04 797,448.49 797,448.49 798,123.94 798,123.94 799,269.66 799,269.66 799,820.97 799,820.97 798,601.66 1,530,639.81
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
51 Cat Anti Karat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
52 Cat Marka (Non Thermoplas) Kg 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
53 Cat Marka (Thermoplastic) Kg 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
54 Cerucuk Diameter 10-15 cm M' 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,159,810.75 1,159,810.75 1,158,638.58 1,158,638.58 1,156,953.13 1,156,953.13 1,156,317.23 1,156,317.23 1,157,296.64 1,157,296.64 1,158,957.96 1,158,957.96 1,159,757.36 1,159,757.36 1,157,989.34 2,219,460.18
57 Curing Compound Liter 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 542,249.18 542,249.18 541,701.15 541,701.15 540,913.15 540,913.15 540,615.85 540,615.85 541,073.75 541,073.75 541,850.47 541,850.47 542,224.22 542,224.22 541,397.62 1,037,669.69
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 630,615.71 630,615.71 629,978.38 629,978.38 629,061.96 629,061.96 628,716.21 628,716.21 629,248.74 629,248.74 630,152.03 630,152.03 630,586.69 630,586.69 629,625.37 1,206,771.42
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 800,319.63 800,319.63 799,510.78 799,510.78 798,347.75 798,347.75 797,908.94 797,908.94 798,584.78 798,584.78 799,731.16 799,731.16 800,282.78 800,282.78 799,062.78 1,531,523.60
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
64 Oxygen (Isi 6 M3) Botol 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
65 Polytene 125 Mikron Kg 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
66 Sand Sheet Ton 1,226,085.65 1,226,085.65 1,224,846.50 1,224,846.50 1,223,064.74 1,223,064.74 1,222,392.50 1,222,392.50 1,223,427.88 1,223,427.88 1,225,184.13 1,225,184.13 1,226,029.21 1,226,029.21 1,224,160.16 2,346,286.47
67 Seal Coat M2 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
68 Seal Guard Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
69 Semen/PC (50 kg) Zak 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
77 Baja Tulangan (Polos) U25 Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
78 Baja Tulangan (Polos) U32 Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,553,924.23 11,553,924.23 11,542,247.16 11,542,247.16 11,525,456.93 11,525,456.93 11,519,122.09 11,519,122.09 11,528,878.93 11,528,878.93 11,545,428.79 11,545,428.79 11,553,392.37 11,553,392.37 11,535,779.56 22,110,050.89
87 Box Culvert Type DUB 200×200 M' 12,264,873.15 12,264,873.15 12,252,477.56 12,252,477.56 12,234,654.18 12,234,654.18 12,227,929.53 12,227,929.53 12,238,286.74 12,238,286.74 12,255,854.97 12,255,854.97 12,264,308.57 12,264,308.57 12,245,611.99 23,470,551.15
88 Box Culvert Type uk 300×200 M' 13,241,925.84 13,241,925.84 13,228,542.79 13,228,542.79 13,209,299.54 13,209,299.54 13,202,039.20 13,202,039.20 13,213,221.49 13,213,221.49 13,232,189.25 13,232,189.25 13,241,316.29 13,241,316.29 13,221,130.28 25,340,278.21
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
91 Ducting (Strand Prestress) M' 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 1,934,022.08 1,934,022.08 1,932,067.45 1,932,067.45 1,929,256.91 1,929,256.91 1,928,196.52 1,928,196.52 1,929,829.72 1,929,829.72 1,932,600.02 1,932,600.02 1,933,933.05 1,933,933.05 1,930,984.83 3,701,021.90
94 Expansion Join Tipe Rubber M' 1,399,806.22 1,399,806.22 1,398,391.49 1,398,391.49 1,396,357.29 1,396,357.29 1,395,589.80 1,395,589.80 1,396,771.88 1,396,771.88 1,398,776.96 1,398,776.96 1,399,741.78 1,399,741.78 1,397,607.92 2,678,725.09
95 Expansion Join Tipe Torma M' 1,605,660.08 1,605,660.08 1,604,037.30 1,604,037.30 1,601,703.95 1,601,703.95 1,600,823.59 1,600,823.59 1,602,179.51 1,602,179.51 1,604,479.46 1,604,479.46 1,605,586.16 1,605,586.16 1,603,138.49 3,072,655.26
96 Expansion Tipe Joint Asphaltic Plug M' 1,904,901.29 1,904,901.29 1,902,976.09 1,902,976.09 1,900,207.87 1,900,207.87 1,899,163.45 1,899,163.45 1,900,772.06 1,900,772.06 1,903,500.64 1,903,500.64 1,904,813.60 1,904,813.60 1,901,909.77 3,645,295.20
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
99 Glass Bead Kg 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
100 Joint Sealent Kg 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
101 Joint Socket Pile 16×16×16 Set 81,337.38 81,337.38 81,255.17 81,255.17 81,136.97 81,136.97 81,092.38 81,092.38 81,161.06 81,161.06 81,277.57 81,277.57 81,333.63 81,333.63 81,209.64 155,650.45
102 Joint Socket Pile 35×35 Set 694,882.28 694,882.28 694,180.00 694,180.00 693,170.19 693,170.19 692,789.20 692,789.20 693,376.00 693,376.00 694,371.35 694,371.35 694,850.30 694,850.30 693,791.02 1,329,754.49
103 Kawat Beton Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
104 Kawat Bronjong Kg 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
105 Kawat Las Dos 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
106 Kayu Acuan (Kelas III/Meranti) M3 3,821,852.56 3,821,852.56 3,817,989.98 3,817,989.98 3,812,436.04 3,812,436.04 3,810,340.58 3,810,340.58 3,813,567.98 3,813,567.98 3,819,042.41 3,819,042.41 3,821,676.63 3,821,676.63 3,815,850.60 7,313,649.72
107 Kayu Perancah (Gelam) M3 2,462,212.95 2,462,212.95 2,459,724.49 2,459,724.49 2,456,146.39 2,456,146.39 2,454,796.40 2,454,796.40 2,456,875.64 2,456,875.64 2,460,402.52 2,460,402.52 2,462,099.61 2,462,099.61 2,458,346.21 4,711,789.05
108 Kerb Pracetak Type 1 (Peninggi) Buah 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
110 Marmer Nama Jembatan Buah 533,211.70 533,211.70 532,672.80 532,672.80 531,897.93 531,897.93 531,605.58 531,605.58 532,055.86 532,055.86 532,819.63 532,819.63 533,187.15 533,187.15 532,374.32 1,020,375.20
111 Mata Kucing Buah 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
112 Matras Concrete (Tebal=10 cm) M2 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
113 Mini Pile 16×16×16 M' 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 230,593.26
114 Mini Timber Pile Buah 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
115 Multipleks 12 mm Lbr 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 272,868.70
116 Paku Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
117 Paving Block (Model Bata 8 cm) M2 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 59,081,060.81 59,081,060.81 59,021,350.07 59,021,350.07 58,935,493.13 58,935,493.13 58,903,099.88 58,903,099.88 58,952,991.54 58,952,991.54 59,037,619.36 59,037,619.36 59,078,341.17 59,078,341.17 58,988,277.95 113,059,877.81
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 83,698,169.48 83,698,169.48 83,613,579.26 83,613,579.26 83,491,948.60 83,491,948.60 83,446,058.17 83,446,058.17 83,516,738.01 83,516,738.01 83,636,627.43 83,636,627.43 83,694,316.66 83,694,316.66 83,566,727.10 160,168,160.23
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 159,971,541.84 159,971,541.84 159,809,865.33 159,809,865.33 159,577,393.77 159,577,393.77 159,489,683.80 159,489,683.80 159,624,773.53 159,624,773.53 159,853,917.09 159,853,917.09 159,964,177.97 159,964,177.97 159,720,317.21 306,127,932.12
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 209,777,129.16 209,777,129.16 209,565,116.23 209,565,116.23 209,260,266.90 209,260,266.90 209,145,249.29 209,145,249.29 209,322,397.90 209,322,397.90 209,622,883.07 209,622,883.07 209,767,472.62 209,767,472.62 209,447,688.18 401,437,893.36
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 267,410,183.82 267,410,183.82 267,139,923.59 267,139,923.59 266,751,321.58 266,751,321.58 266,604,704.63 266,604,704.63 266,830,522.11 266,830,522.11 267,213,560.99 267,213,560.99 267,397,874.29 267,397,874.29 266,990,233.98 511,726,808.77
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 322,630,229.63 322,630,229.63 322,304,160.82 322,304,160.82 321,835,312.72 321,835,312.72 321,658,419.46 321,658,419.46 321,930,868.12 321,930,868.12 322,393,004.30 322,393,004.30 322,615,378.19 322,615,378.19 322,123,560.39 617,398,094.05
124 Pelat Rambu (Eng. Grade) Buah 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
125 Pelat Rambu (High L Grade) Buah 217,903.84 217,903.84 217,683.61 217,683.61 217,366.95 217,366.95 217,247.48 217,247.48 217,431.49 217,431.49 217,743.62 217,743.62 217,893.81 217,893.81 217,561.63 416,989.49
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
128 Pipa Drainase Baja Dia 3" M' 245,016.30 245,016.30 244,768.67 244,768.67 244,412.61 244,412.61 244,278.27 244,278.27 244,485.18 244,485.18 244,836.14 244,836.14 245,005.02 245,005.02 244,631.52 468,872.97
129 Pipa Galvanis Dia 1,5" M' 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
130 Pipa Galvanis Dia 2" M' 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
131 Pipa Galvanis Dia 3" M' 214,891.34 214,891.34 214,674.16 214,674.16 214,361.88 214,361.88 214,244.06 214,244.06 214,425.52 214,425.52 214,733.34 214,733.34 214,881.45 214,881.45 214,553.87 411,224.66
132 Pipa Porus M' 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
133 Pipa PVC Dia 4" M' 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43 155,401.17 297,849.63
134 Plastik Filter M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
135 Rel Pengaman M' 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,825,572.24 1,825,572.24 1,823,727.22 1,823,727.22 1,821,074.28 1,821,074.28 1,820,073.35 1,820,073.35 1,821,614.97 1,821,614.97 1,824,229.93 1,824,229.93 1,825,488.21 1,825,488.21 1,822,705.30 3,493,487.96
137 Strip Bearing Buah 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
138 Tiang Pancang Baja Diameter 400 M' 646,682.36 646,682.36 646,028.78 646,028.78 645,089.02 645,089.02 644,734.45 644,734.45 645,280.55 645,280.55 646,206.86 646,206.86 646,652.59 646,652.59 645,666.79 1,237,517.19
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 790,277.97 790,277.97 789,479.27 789,479.27 788,330.84 788,330.84 787,897.54 787,897.54 788,564.90 788,564.90 789,696.89 789,696.89 790,241.60 790,241.60 789,036.89 1,512,307.50
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,652,855.84 1,652,855.84 1,651,185.37 1,651,185.37 1,648,783.43 1,648,783.43 1,647,877.19 1,647,877.19 1,649,272.96 1,649,272.96 1,651,640.52 1,651,640.52 1,652,779.75 1,652,779.75 1,650,260.14 3,162,970.95
HARGA SATUAN DASAR UPAH KABUPATEN TULUNGAGUNG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
2 Tukang OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
3 Mandor OH 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
4 Operator OH 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
5 Pembantu Operator OH 192,000 192,000 192,519.49 192,519.49 192,784.89 192,784.89 192,790.26 192,790.26 192,535.63 192,535.63 192,260.61 192,260.61 192,218.99 192,218.99 192,444.64 192,444.64 192,724.52 192,724.52
6 Sopir OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
7 Pembantu Sopir OH 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
8 Mekanik OH 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
9 Pembantu Mekanik OH 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
10 Kepala Tukang OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
11 Pemasak Aspal OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39

HARGA SATUAN DASAR ALAT KABUPATEN TULUNGAGUNG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 451,715 504,000 452,936.69 505,363.65 453,561.10 506,060.34 453,573.73 506,074.43 452,974.67 505,406.03 452,327.64 504,684.10 452,229.72 504,574.85 452,760.60 505,167.18 453,419.07 505,901.87
2 Asphalt Distribution Unit/Jam 278,126 358,000 278,878.22 358,968.62 279,262.67 359,463.49 279,270.45 359,473.50 278,901.60 358,998.73 278,503.22 358,485.93 278,442.93 358,408.32 278,769.80 358,829.07 279,175.22 359,350.93
3 Asphalt Finisher Unit/Jam 204,279 969,000 204,831.24 971,621.78 205,113.62 972,961.24 205,119.33 972,988.33 204,848.42 971,703.26 204,555.81 970,315.26 204,511.53 970,105.21 204,751.61 971,244.05 205,049.39 972,656.57
4 Asphalt Liquid Mixer Unit/Jam 72,888 133,000 73,085.33 133,359.85 73,186.08 133,543.70 73,188.12 133,547.42 73,091.45 133,371.04 72,987.05 133,180.53 72,971.25 133,151.70 73,056.91 133,308.01 73,163.16 133,501.88
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 97,824 97,824 98,088.20 98,088.20 98,223.42 98,223.42 98,226.16 98,226.16 98,096.43 98,096.43 97,956.30 97,956.30 97,935.10 97,935.10 98,050.07 98,050.07 98,192.67 98,192.67
6 Asphalt Mixing Plant Unit/Jam 1,093,322 5,985,873 1,096,279.88 6,002,068.35 1,097,791.20 6,010,342.74 1,097,821.76 6,010,510.05 1,096,371.81 6,002,571.68 1,094,805.74 5,993,997.53 1,094,568.74 5,992,699.98 1,095,853.69 5,999,734.98 1,097,447.43 6,008,460.63
7 Asphalt Sprayer Unit/Jam 90,151 90,151 90,395.01 90,395.01 90,519.63 90,519.63 90,522.15 90,522.15 90,402.59 90,402.59 90,273.46 90,273.46 90,253.91 90,253.91 90,359.87 90,359.87 90,491.28 90,491.28
8 Asphalt Tanker Unit/Jam 421,984 489,000 423,125.57 490,323.06 423,708.88 490,999.02 423,720.68 491,012.69 423,161.05 490,364.18 422,556.60 489,663.74 422,465.13 489,557.74 422,961.07 490,132.45 423,576.20 490,845.26
9 Blending Equipment Unit/Jam 137,145 217,000 137,515.81 217,587.13 137,705.39 217,887.09 137,709.22 217,893.16 137,527.34 217,605.37 137,330.90 217,294.54 137,301.17 217,247.50 137,462.35 217,502.54 137,662.27 217,818.86
10 Bore Pile Machine Unit/Jam 377,867 657,000 378,889.71 658,777.61 379,412.05 659,685.80 379,422.61 659,704.16 378,921.49 658,832.86 378,380.23 657,891.77 378,298.32 657,749.36 378,742.42 658,521.51 379,293.24 659,479.22
11 Bore Pile Machine Dia 60 Unit/Jam 247,436 748,000 248,105.45 750,023.83 248,447.48 751,057.80 248,454.40 751,078.71 248,126.25 750,086.72 247,771.83 749,015.29 247,718.19 748,853.15 248,008.99 749,732.25 248,369.68 750,822.61
12 Bore Pile Machine Dia 80 Unit/Jam 978,235 978,235 980,882.00 980,882.00 982,234.23 982,234.23 982,261.57 982,261.57 980,964.25 980,964.25 979,563.03 979,563.03 979,350.98 979,350.98 980,500.67 980,500.67 981,926.65 981,926.65
13 Bulldozer 100-150 HP Unit/Jam 383,622 556,000 384,659.61 557,504.34 385,189.89 558,272.91 385,200.62 558,288.45 384,691.86 557,551.09 384,142.37 556,754.68 384,059.21 556,634.16 384,510.07 557,287.61 385,069.27 558,098.09
14 Cement Tanker Unit/Jam 356,768 460,000 357,733.44 461,244.60 358,226.60 461,880.47 358,236.57 461,893.32 357,763.43 461,283.28 357,252.40 460,624.38 357,175.06 460,524.66 357,594.36 461,065.29 358,114.43 461,735.83
15 Cold Milling Unit/Jam 557,210 1,186,000 558,718.08 1,189,208.90 559,488.32 1,190,848.33 559,503.90 1,190,881.48 558,764.93 1,189,308.63 557,966.79 1,187,609.81 557,846.00 1,187,352.72 558,500.87 1,188,746.59 559,313.12 1,190,475.43
16 Cold Recycler Unit/Jam 4,692,652 4,692,652 4,705,348.65 4,705,348.65 4,711,835.39 4,711,835.39 4,711,966.55 4,711,966.55 4,705,743.23 4,705,743.23 4,699,021.49 4,699,021.49 4,698,004.27 4,698,004.27 4,703,519.39 4,703,519.39 4,710,359.90 4,710,359.90
17 Compressor 4000-6500 L\M Unit/Jam 142,899 142,899 143,285.70 143,285.70 143,483.24 143,483.24 143,487.23 143,487.23 143,297.72 143,297.72 143,093.03 143,093.03 143,062.06 143,062.06 143,230.00 143,230.00 143,438.30 143,438.30
18 Concrete Breaker Unit/Jam 520,766 993,000 522,175.42 995,686.71 522,895.28 997,059.36 522,909.84 997,087.11 522,219.21 995,770.21 521,473.26 994,347.84 521,360.38 994,132.59 521,972.42 995,299.63 522,731.54 996,747.13
19 Concrete Mixer (350) Unit/Jam 96,864 96,864 97,126.55 97,126.55 97,260.45 97,260.45 97,263.16 97,263.16 97,134.70 97,134.70 96,995.95 96,995.95 96,974.95 96,974.95 97,088.79 97,088.79 97,229.99 97,229.99
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 110,291 110,291 110,589.64 110,589.64 110,742.09 110,742.09 110,745.18 110,745.18 110,598.91 110,598.91 110,440.93 110,440.93 110,417.02 110,417.02 110,546.64 110,546.64 110,707.42 110,707.42
21 Concrete Pan Mixer Unit/Jam 293,471 628,000 294,264.60 629,699.15 294,670.27 630,567.25 294,678.47 630,584.80 294,289.28 629,751.96 293,868.91 628,852.41 293,805.29 628,716.28 294,150.20 629,454.35 294,578.00 630,369.79
22 Concrete Pump Unit/Jam 223,460 240,000 224,064.22 240,649.36 224,373.11 240,981.11 224,379.36 240,987.82 224,083.01 240,669.54 223,762.93 240,325.76 223,714.49 240,273.74 223,977.11 240,555.80 224,302.85 240,905.65
23 Concrete Vibrator Unit/Jam 83,438 83,438 83,663.46 83,663.46 83,778.80 83,778.80 83,781.13 83,781.13 83,670.48 83,670.48 83,550.96 83,550.96 83,532.88 83,532.88 83,630.94 83,630.94 83,752.57 83,752.57
24 Crane 10-15 Ton Unit/Jam 299,225 299,225 300,034.49 300,034.49 300,448.12 300,448.12 300,456.48 300,456.48 300,059.65 300,059.65 299,631.05 299,631.05 299,566.18 299,566.18 299,917.85 299,917.85 300,354.03 300,354.03
25 Crane On Track 35 Ton Unit/Jam 248,395 472,000 249,067.10 473,277.07 249,410.46 473,929.52 249,417.40 473,942.72 249,087.98 473,316.76 248,732.18 472,640.66 248,678.34 472,538.35 248,970.27 473,093.08 249,332.36 473,781.11
26 Crane On Track 75-100 Ton Unit/Jam 390,335 592,000 391,391.15 593,601.75 391,930.72 594,420.08 391,941.63 594,436.63 391,423.97 593,651.53 390,864.86 592,803.55 390,780.24 592,675.22 391,238.99 593,370.98 391,807.99 594,233.94
27 Dump Truck 10 Ton Unit/Jam 369,236 397,000 370,234.87 398,074.14 370,745.27 398,622.92 370,755.59 398,634.02 370,265.92 398,107.53 369,737.03 397,538.86 369,656.99 397,452.81 370,090.94 397,919.39 370,629.18 398,498.10
28 Dump Truck 3-4 M3 Unit/Jam 201,401 264,000 201,946.29 264,714.29 202,224.69 265,079.22 202,230.32 265,086.60 201,963.23 264,736.49 201,674.74 264,358.34 201,631.08 264,301.11 201,867.78 264,611.38 202,161.37 264,996.22
29 Excavator 80-140 HP Unit/Jam 291,552 463,000 292,341.30 464,252.72 292,744.32 464,892.73 292,752.47 464,905.67 292,365.82 464,291.65 291,948.20 463,628.45 291,885.00 463,528.09 292,227.65 464,072.23 292,652.65 464,747.15
30 Flat Bed Truck 3-4 M3 Unit/Jam 353,891 473,000 354,848.49 474,279.77 355,337.68 474,933.61 355,347.57 474,946.83 354,878.25 474,319.55 354,371.33 473,642.02 354,294.62 473,539.49 354,710.54 474,095.39 355,226.41 474,784.89
31 Fulvi Mixer Unit/Jam 886,166 1,384,000 888,563.69 1,387,744.62 889,788.66 1,389,657.75 889,813.43 1,389,696.44 888,638.21 1,387,861.00 887,368.86 1,385,878.56 887,176.77 1,385,578.55 888,218.25 1,387,205.12 889,510.02 1,389,222.59
32 Generator Set Unit/Jam 394,171 418,000 395,237.75 419,130.96 395,782.62 419,708.77 395,793.63 419,720.46 395,270.89 419,166.11 394,706.28 418,567.37 394,620.84 418,476.76 395,084.09 418,968.02 395,658.68 419,577.34
33 Hot Recycler Unit/Jam 2,895,384 8,491,000 2,903,218.39 8,513,973.70 2,907,220.73 8,525,710.97 2,907,301.66 8,525,948.30 2,903,461.85 8,514,687.67 2,899,314.50 8,502,525.18 2,898,686.88 8,500,684.60 2,902,089.73 8,510,663.79 2,906,310.35 8,523,041.19
34 Jack Hammer Unit/Jam 54,666 54,666 54,813.99 54,813.99 54,889.56 54,889.56 54,891.09 54,891.09 54,818.59 54,818.59 54,740.29 54,740.29 54,728.44 54,728.44 54,792.68 54,792.68 54,872.37 54,872.37
35 Launching Gantry Unit/Jam 69,568,829 69,568,829 69,757,058.18 69,757,058.18 69,853,224.46 69,853,224.46 69,855,169.00 69,855,169.00 69,762,907.91 69,762,907.91 69,663,257.66 69,663,257.66 69,648,177.34 69,648,177.34 69,729,939.29 69,729,939.29 69,831,350.31 69,831,350.31
36 Motor Grader > 100 HP Unit/Jam 273,330 459,000 274,069.97 460,241.89 274,447.80 460,876.38 274,455.44 460,889.21 274,092.95 460,280.49 273,701.44 459,623.02 273,642.19 459,523.52 273,963.42 460,062.97 274,361.86 460,732.06
37 Pedestrian Roller Unit/Jam 90,151 90,151 90,395.01 90,395.01 90,519.63 90,519.63 90,522.15 90,522.15 90,402.59 90,402.59 90,273.46 90,273.46 90,253.91 90,253.91 90,359.87 90,359.87 90,491.28 90,491.28
38 Pile Driver + Hammer Unit/Jam 102,619 300,000 102,896.45 300,811.70 103,038.30 301,226.39 103,041.17 301,234.78 102,905.07 300,836.92 102,758.08 300,407.20 102,735.84 300,342.17 102,856.44 300,694.75 103,006.03 301,132.06
39 Rock Drill Breaker Unit/Jam 99,742 324,000 100,011.50 324,876.63 100,149.37 325,324.50 100,152.16 325,333.56 100,019.88 324,903.88 99,877.02 324,439.78 99,855.39 324,369.55 99,972.62 324,750.33 100,118.01 325,222.63
40 Split Form Paver Unit/Jam 210,992 210,992 211,562.78 211,562.78 211,854.44 211,854.44 211,860.34 211,860.34 211,580.53 211,580.53 211,278.30 211,278.30 211,232.56 211,232.56 211,480.54 211,480.54 211,788.10 211,788.10
41 Stone Crusher Unit/Jam 564,883 704,000 566,411.27 705,904.78 567,192.12 706,877.93 567,207.91 706,897.61 566,458.77 705,963.98 565,649.63 704,955.57 565,527.18 704,802.96 566,191.07 705,630.35 567,014.51 706,656.58
42 Tamper Unit/Jam 84,397 84,397 84,625.11 84,625.11 84,741.78 84,741.78 84,744.14 84,744.14 84,632.21 84,632.21 84,511.32 84,511.32 84,493.03 84,493.03 84,592.21 84,592.21 84,715.24 84,715.24
43 Tandem Roller 6-8 T Unit/Jam 407,598 476,000 408,700.83 477,287.89 409,264.26 477,945.87 409,275.66 477,959.18 408,735.11 477,327.92 408,151.26 476,646.09 408,062.91 476,542.91 408,541.95 477,102.34 409,136.10 477,796.21
44 Three Wheel Roller 6-8 T Unit/Jam 135,227 171,000 135,592.51 171,462.67 135,779.44 171,699.04 135,783.22 171,703.82 135,603.88 171,477.05 135,410.18 171,232.11 135,380.87 171,195.04 135,539.80 171,396.01 135,736.92 171,645.28
45 Tire Roller 8-10 T Unit/Jam 241,682 436,000 242,335.55 437,179.66 242,669.63 437,782.36 242,676.39 437,794.54 242,355.87 437,216.33 242,009.69 436,591.80 241,957.30 436,497.29 242,241.34 437,009.71 242,593.64 437,645.27
46 Track Loader 75-100 HP Unit/Jam 226,337 298,000 226,949.17 298,806.28 227,262.04 299,218.22 227,268.36 299,226.55 226,968.20 298,831.34 226,644.00 298,404.49 226,594.93 298,339.89 226,860.94 298,690.12 227,190.87 299,124.52
47 Trailer 20 Ton Unit/Jam 365,400 505,000 366,388.28 506,366.35 366,893.37 507,064.43 366,903.59 507,078.54 366,419.00 506,408.82 365,895.60 505,685.46 365,816.40 505,575.99 366,245.84 506,169.50 366,778.48 506,905.64
48 Trailler 15 Ton Unit/Jam 316,488 481,000 317,344.18 482,301.42 317,781.66 482,966.31 317,790.51 482,979.76 317,370.79 482,341.86 316,917.45 481,652.88 316,848.85 481,548.62 317,220.80 482,113.92 317,682.15 482,815.08
49 Truck Mixer (agitator) Unit/Jam 398,007 585,000 399,084.34 586,582.81 399,634.52 587,391.46 399,645.64 587,407.81 399,117.81 586,632.00 398,547.70 585,794.04 398,461.43 585,667.23 398,929.19 586,354.77 399,509.37 587,207.53
50 Vibrating Rammer Unit/Jam 81,520 81,520 81,740.17 81,740.17 81,852.85 81,852.85 81,855.13 81,855.13 81,747.02 81,747.02 81,630.25 81,630.25 81,612.58 81,612.58 81,708.39 81,708.39 81,827.22 81,827.22
51 Vibratory Roller 5-8 T Unit/Jam 196,606 422,000 197,138.05 423,141.79 197,409.82 423,725.12 197,415.32 423,736.92 197,154.58 423,177.27 196,872.96 422,572.80 196,830.34 422,481.32 197,061.41 422,977.28 197,348.00 423,592.44
52 Water Pump 70-100 MM Unit/Jam 61,379 61,379 61,545.54 61,545.54 61,630.38 61,630.38 61,632.10 61,632.10 61,550.70 61,550.70 61,462.78 61,462.78 61,449.47 61,449.47 61,521.61 61,521.61 61,611.08 61,611.08
53 Water Tanker 3000-4500 L Unit/Jam 222,501 222,501 223,102.57 223,102.57 223,410.14 223,410.14 223,416.36 223,416.36 223,121.28 223,121.28 222,802.57 222,802.57 222,754.34 222,754.34 223,015.84 223,015.84 223,340.18 223,340.18
54 Welding Set Unit/Jam 124,677 124,677 125,014.37 125,014.37 125,186.72 125,186.72 125,190.20 125,190.20 125,024.86 125,024.86 124,846.27 124,846.27 124,819.24 124,819.24 124,965.77 124,965.77 125,147.51 125,147.51
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 216,746 345,000 217,332.68 345,933.45 217,632.29 346,410.35 217,638.35 346,419.99 217,350.90 345,962.46 217,040.44 345,468.28 216,993.45 345,393.50 217,248.19 345,798.96 217,564.14 346,301.87
HARGA SATUAN DASAR BAHAN KABUPATEN TULUNGAGUNG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
2 Agregat Pecah Mesin 20-30 mm M3 288,000 288,000 288,779.23 288,779.23 289,177.34 289,177.34 289,185.39 289,185.39 288,803.44 288,803.44 288,390.91 288,390.91 288,328.48 288,328.48 288,666.96 288,666.96 289,086.78 289,086.78
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 330,000 330,000 330,892.87 330,892.87 331,349.03 331,349.03 331,358.25 331,358.25 330,920.61 330,920.61 330,447.92 330,447.92 330,376.39 330,376.39 330,764.23 330,764.23 331,245.27 331,245.27
4 Bahan Agr. Base Kelas A M3 316,000 316,000 316,854.99 316,854.99 317,291.80 317,291.80 317,300.63 317,300.63 316,881.56 316,881.56 316,428.92 316,428.92 316,360.42 316,360.42 316,731.81 316,731.81 317,192.44 317,192.44
5 Bahan Agr. Base Kelas B M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
6 Bahan Agr. Base Kelas C M3 273,000 273,000 273,738.64 273,738.64 274,116.02 274,116.02 274,123.65 274,123.65 273,761.60 273,761.60 273,370.55 273,370.55 273,311.38 273,311.38 273,632.22 273,632.22 274,030.18 274,030.18
7 Bahan Agr. Base Kelas C2 M3 249,000 249,000 249,673.71 249,673.71 250,017.90 250,017.90 250,024.86 250,024.86 249,694.64 249,694.64 249,337.98 249,337.98 249,284.00 249,284.00 249,576.64 249,576.64 249,939.61 249,939.61
8 Bahan Agr. Base Kelas S M3 202,000 202,000 202,546.54 202,546.54 202,825.77 202,825.77 202,831.42 202,831.42 202,563.53 202,563.53 202,274.18 202,274.18 202,230.40 202,230.40 202,467.80 202,467.80 202,762.26 202,762.26
9 Bahan Pilihan M3 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
10 Bahan Tanah Timbunan M3 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
11 Batu Belah/Kerakal M3 325,000 325,000 325,879.34 325,879.34 326,328.59 326,328.59 326,337.67 326,337.67 325,906.67 325,906.67 325,441.14 325,441.14 325,370.69 325,370.69 325,752.65 325,752.65 326,226.40 326,226.40
12 Batu Kali M3 358,000 358,000 358,968.62 358,968.62 359,463.49 359,463.49 359,473.50 359,473.50 358,998.73 358,998.73 358,485.93 358,485.93 358,408.32 358,408.32 358,829.07 358,829.07 359,350.93 359,350.93
13 Chipping M3 213,000 213,000 213,576.30 213,576.30 213,870.74 213,870.74 213,876.69 213,876.69 213,594.21 213,594.21 213,289.11 213,289.11 213,242.94 213,242.94 213,493.27 213,493.27 213,803.77 213,803.77
14 Chipping (kg) Kg 261 261 261.71 261.71 262.07 262.07 262.07 262.07 261.73 261.73 261.35 261.35 261.30 261.30 261.60 261.60 261.98 261.98
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 383,000 383,000 384,036.27 384,036.27 384,565.69 384,565.69 384,576.40 384,576.40 384,068.47 384,068.47 383,519.86 383,519.86 383,436.84 383,436.84 383,886.97 383,886.97 384,445.27 384,445.27
18 Kapur M3 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
19 Pasir Beton (Kasar) M3 456,000 456,000 457,233.78 457,233.78 457,864.12 457,864.12 457,876.86 457,876.86 457,272.12 457,272.12 456,618.95 456,618.95 456,520.10 456,520.10 457,056.02 457,056.02 457,720.74 457,720.74
20 Pasir Halus (untuk HRS) M3 288,000 288,000 288,779.23 288,779.23 289,177.34 289,177.34 289,185.39 289,185.39 288,803.44 288,803.44 288,390.91 288,390.91 288,328.48 288,328.48 288,666.96 288,666.96 289,086.78 289,086.78
21 Pasir Pasang (Sedang) M3 322,000 322,000 322,871.22 322,871.22 323,316.33 323,316.33 323,325.33 323,325.33 322,898.30 322,898.30 322,437.06 322,437.06 322,367.26 322,367.26 322,745.70 322,745.70 323,215.08 323,215.08
22 Pasir Urug M3 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
23 Pasir Urug (ada unsur lempung) M3 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
24 Sirtu M3 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
26 Anti Pengelupas Liter 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
27 Arbocell Kg 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12 136,314.95 136,314.95 136,513.20 136,513.20
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 565,842 565,842 567,372.92 567,372.92 568,155.09 568,155.09 568,170.91 568,170.91 567,420.50 567,420.50 566,609.99 566,609.99 566,487.33 566,487.33 567,152.35 567,152.35 567,977.18 567,977.18
41 Beton K-125 (fc' 10 MPa) M3 585,023 585,023 586,605.90 586,605.90 587,414.59 587,414.59 587,430.94 587,430.94 586,655.09 586,655.09 585,817.11 585,817.11 585,690.29 585,690.29 586,377.85 586,377.85 587,230.64 587,230.64
42 Beton K-175 (fc' 15 MPa) M3 632,976 632,976 634,688.35 634,688.35 635,563.33 635,563.33 635,581.02 635,581.02 634,741.58 634,741.58 633,834.90 633,834.90 633,697.69 633,697.69 634,441.61 634,441.61 635,364.30 635,364.30
43 Beton K-250 (fc' 20 MPa) M3 704,905 704,905 706,812.03 706,812.03 707,786.43 707,786.43 707,806.13 707,806.13 706,871.30 706,871.30 705,861.60 705,861.60 705,708.80 705,708.80 706,537.25 706,537.25 707,564.79 707,564.79
44 Beton K-300 (fc' 25 MPa) M3 733,676 733,676 735,661.50 735,661.50 736,675.67 736,675.67 736,696.18 736,696.18 735,723.19 735,723.19 734,672.27 734,672.27 734,513.24 734,513.24 735,375.50 735,375.50 736,444.99 736,444.99
45 Beton K-350 (fc' 30 MPa) M3 762,448 762,448 764,510.97 764,510.97 765,564.92 765,564.92 765,586.23 765,586.23 764,575.08 764,575.08 763,482.95 763,482.95 763,317.68 763,317.68 764,213.76 764,213.76 765,325.18 765,325.18
46 Beton K-400 (fc' 35 MPa) M3 791,220 791,220 793,360.44 793,360.44 794,454.16 794,454.16 794,476.27 794,476.27 793,426.97 793,426.97 792,293.63 792,293.63 792,122.12 792,122.12 793,052.01 793,052.01 794,205.38 794,205.38
47 Beton K-450 (fc' 40 MPa) M3 829,582 829,582 831,826.40 831,826.40 832,973.15 832,973.15 832,996.34 832,996.34 831,896.16 831,896.16 830,707.87 830,707.87 830,528.04 830,528.04 831,503.02 831,503.02 832,712.31 832,712.31
48 Beton K-500 (fc' 45 MPa) M3 863,149 863,149 865,484.12 865,484.12 866,677.26 866,677.26 866,701.39 866,701.39 865,556.70 865,556.70 864,320.32 864,320.32 864,133.22 864,133.22 865,147.65 865,147.65 866,405.87 866,405.87
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
51 Cat Anti Karat Kg 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
52 Cat Marka (Non Thermoplas) Kg 52,000 52,000 52,140.69 52,140.69 52,212.57 52,212.57 52,214.03 52,214.03 52,145.07 52,145.07 52,070.58 52,070.58 52,059.31 52,059.31 52,120.42 52,120.42 52,196.22 52,196.22
53 Cat Marka (Thermoplastic) Kg 54,000 54,000 54,146.11 54,146.11 54,220.75 54,220.75 54,222.26 54,222.26 54,150.65 54,150.65 54,073.30 54,073.30 54,061.59 54,061.59 54,125.06 54,125.06 54,203.77 54,203.77
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,252,000 1,252,000 1,255,387.48 1,255,387.48 1,257,118.14 1,257,118.14 1,257,153.14 1,257,153.14 1,255,492.75 1,255,492.75 1,253,699.39 1,253,699.39 1,253,428.00 1,253,428.00 1,254,899.43 1,254,899.43 1,256,724.48 1,256,724.48
57 Curing Compound Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 585,000 585,000 586,582.81 586,582.81 587,391.46 587,391.46 587,407.81 587,407.81 586,632.00 586,632.00 585,794.04 585,794.04 585,667.23 585,667.23 586,354.77 586,354.77 587,207.53 587,207.53
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 681,000 681,000 682,842.55 682,842.55 683,783.91 683,783.91 683,802.94 683,802.94 682,899.81 682,899.81 681,924.35 681,924.35 681,776.73 681,776.73 682,577.09 682,577.09 683,569.79 683,569.79
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 863,000 863,000 865,334.98 865,334.98 866,527.92 866,527.92 866,552.04 866,552.04 865,407.54 865,407.54 864,171.39 864,171.39 863,984.31 863,984.31 864,998.57 864,998.57 866,256.57 866,256.57
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
64 Oxygen (Isi 6 M3) Botol 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,323,000 1,323,000 1,326,579.58 1,326,579.58 1,328,408.39 1,328,408.39 1,328,445.37 1,328,445.37 1,326,690.82 1,326,690.82 1,324,795.76 1,324,795.76 1,324,508.98 1,324,508.98 1,326,063.86 1,326,063.86 1,327,992.40 1,327,992.40
67 Seal Coat M2 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
68 Seal Guard Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
69 Semen/PC (50 kg) Zak 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
70 Semen/PC (kg) Kg 1,000 1,000 1,002.71 1,002.71 1,004.09 1,004.09 1,004.12 1,004.12 1,002.79 1,002.79 1,001.36 1,001.36 1,001.14 1,001.14 1,002.32 1,002.32 1,003.77 1,003.77
71 Slurry Seal Ton 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
72 Solar Liter 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
73 Thinner Liter 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80 27,062.53 27,062.53 27,101.89 27,101.89
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 11,000 9,000 11,029.76 9,024.35 11,044.97 9,036.79 11,045.28 9,037.04 11,030.69 9,025.11 11,014.93 9,012.22 11,012.55 9,010.27 11,025.47 9,020.84 11,041.51 9,033.96
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
84 Baja Tulangan (Ulir) D36 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
85 Besi Beton Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,468,000 12,468,000 12,501,734.09 12,501,734.09 12,518,968.83 12,518,968.83 12,519,317.33 12,519,317.33 12,502,782.46 12,502,782.46 12,484,923.32 12,484,923.32 12,482,220.66 12,482,220.66 12,496,873.89 12,496,873.89 12,515,048.59 12,515,048.59
87 Box Culvert Type DUB 200×200 M' 13,235,000 13,235,000 13,270,809.32 13,270,809.32 13,289,104.31 13,289,104.31 13,289,474.24 13,289,474.24 13,271,922.19 13,271,922.19 13,252,964.40 13,252,964.40 13,250,095.48 13,250,095.48 13,265,650.13 13,265,650.13 13,284,942.90 13,284,942.90
88 Box Culvert Type uk 300×200 M' 14,290,000 14,290,000 14,328,663.79 14,328,663.79 14,348,417.12 14,348,417.12 14,348,816.54 14,348,816.54 14,329,865.37 14,329,865.37 14,309,396.40 14,309,396.40 14,306,298.78 14,306,298.78 14,323,093.35 14,323,093.35 14,343,923.99 14,343,923.99
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
91 Ducting (Strand Prestress) M' 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,087,000 2,087,000 2,092,646.70 2,092,646.70 2,095,531.60 2,095,531.60 2,095,589.93 2,095,589.93 2,092,822.18 2,092,822.18 2,089,832.77 2,089,832.77 2,089,380.37 2,089,380.37 2,091,833.16 2,091,833.16 2,094,875.39 2,094,875.39
94 Expansion Join Tipe Rubber M' 1,511,000 1,511,000 1,515,088.24 1,515,088.24 1,517,176.93 1,517,176.93 1,517,219.16 1,517,219.16 1,515,215.30 1,515,215.30 1,513,050.94 1,513,050.94 1,512,723.40 1,512,723.40 1,514,499.23 1,514,499.23 1,516,701.83 1,516,701.83
95 Expansion Join Tipe Torma M' 1,733,000 1,733,000 1,737,688.90 1,737,688.90 1,740,084.46 1,740,084.46 1,740,132.89 1,740,132.89 1,737,834.62 1,737,834.62 1,735,352.27 1,735,352.27 1,734,976.61 1,734,976.61 1,737,013.35 1,737,013.35 1,739,539.56 1,739,539.56
96 Expansion Tipe Joint Asphaltic Plug M' 2,056,000 2,056,000 2,061,562.82 2,061,562.82 2,064,404.87 2,064,404.87 2,064,462.34 2,064,462.34 2,061,735.70 2,061,735.70 2,058,790.69 2,058,790.69 2,058,345.02 2,058,345.02 2,060,761.37 2,060,761.37 2,063,758.41 2,063,758.41
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
99 Glass Bead Kg 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
100 Joint Sealent Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
101 Joint Socket Pile 16×16×16 Set 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
102 Joint Socket Pile 35×35 Set 750,000 750,000 752,029.24 752,029.24 753,065.98 753,065.98 753,086.94 753,086.94 752,092.30 752,092.30 751,018.01 751,018.01 750,855.43 750,855.43 751,736.88 751,736.88 752,830.16 752,830.16
103 Kawat Beton Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
104 Kawat Bronjong Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
105 Kawat Las Dos 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
106 Kayu Acuan (Kelas III/Meranti) M3 4,124,000 4,124,000 4,135,158.11 4,135,158.11 4,140,858.80 4,140,858.80 4,140,974.07 4,140,974.07 4,135,504.88 4,135,504.88 4,129,597.67 4,129,597.67 4,128,703.72 4,128,703.72 4,133,550.52 4,133,550.52 4,139,562.11 4,139,562.11
107 Kayu Perancah (Gelam) M3 2,657,000 2,657,000 2,664,188.92 2,664,188.92 2,667,861.74 2,667,861.74 2,667,936.01 2,667,936.01 2,664,412.34 2,664,412.34 2,660,606.45 2,660,606.45 2,660,030.50 2,660,030.50 2,663,153.19 2,663,153.19 2,667,026.31 2,667,026.31
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
110 Marmer Nama Jembatan Buah 575,000 575,000 576,555.75 576,555.75 577,350.58 577,350.58 577,366.66 577,366.66 576,604.10 576,604.10 575,780.47 575,780.47 575,655.83 575,655.83 576,331.61 576,331.61 577,169.79 577,169.79
111 Mata Kucing Buah 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
112 Matras Concrete (Tebal=10 cm) M2 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
113 Mini Pile 16×16×16 M' 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
114 Mini Timber Pile Buah 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
115 Multipleks 12 mm Lbr 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
116 Paku Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
117 Paving Block (Model Bata 8 cm) M2 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 63,756,000 63,756,000 63,928,501.63 63,928,501.63 64,016,632.73 64,016,632.73 64,018,414.79 64,018,414.79 63,933,862.58 63,933,862.58 63,842,538.61 63,842,538.61 63,828,718.34 63,828,718.34 63,903,648.66 63,903,648.66 63,996,586.27 63,996,586.27
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 90,321,000 90,321,000 90,565,377.31 90,565,377.31 90,690,229.70 90,690,229.70 90,692,754.29 90,692,754.29 90,572,971.99 90,572,971.99 90,443,596.37 90,443,596.37 90,424,017.64 90,424,017.64 90,530,168.93 90,530,168.93 90,661,830.56 90,661,830.56
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 172,630,000 172,630,000 173,097,076.93 173,097,076.93 173,335,706.56 173,335,706.56 173,340,531.80 173,340,531.80 173,111,592.60 173,111,592.60 172,864,317.73 172,864,317.73 172,826,897.02 172,826,897.02 173,029,783.36 173,029,783.36 173,281,427.45 173,281,427.45
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 226,377,000 226,377,000 226,989,497.68 226,989,497.68 227,302,422.78 227,302,422.78 227,308,750.31 227,308,750.31 227,008,532.68 227,008,532.68 226,684,270.72 226,684,270.72 226,635,199.37 226,635,199.37 226,901,252.78 226,901,252.78 227,231,244.29 227,231,244.29
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 288,570,000 288,570,000 289,350,770.37 289,350,770.37 289,749,666.01 289,749,666.01 289,757,731.92 289,757,731.92 289,375,034.90 289,375,034.90 288,961,687.81 288,961,687.81 288,899,134.99 288,899,134.99 289,238,281.79 289,238,281.79 289,658,932.51 289,658,932.51
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 348,160,000 348,160,000 349,102,000.25 349,102,000.25 349,583,268.25 349,583,268.25 349,592,999.77 349,592,999.77 349,131,275.44 349,131,275.44 348,632,571.74 348,632,571.74 348,557,101.70 348,557,101.70 348,966,282.66 348,966,282.66 349,473,798.19 349,473,798.19
124 Pelat Rambu (Eng. Grade) Buah 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
125 Pelat Rambu (High L Grade) Buah 235,000 235,000 235,635.83 235,635.83 235,960.67 235,960.67 235,967.24 235,967.24 235,655.59 235,655.59 235,318.98 235,318.98 235,268.03 235,268.03 235,544.22 235,544.22 235,886.78 235,886.78
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 264,000 264,000 264,714.29 264,714.29 265,079.22 265,079.22 265,086.60 265,086.60 264,736.49 264,736.49 264,358.34 264,358.34 264,301.11 264,301.11 264,611.38 264,611.38 264,996.22 264,996.22
129 Pipa Galvanis Dia 1,5" M' 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
130 Pipa Galvanis Dia 2" M' 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
131 Pipa Galvanis Dia 3" M' 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
132 Pipa Porus M' 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
133 Pipa PVC Dia 4" M' 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
134 Plastik Filter M2 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
135 Rel Pengaman M' 163,000 163,000 163,441.02 163,441.02 163,666.34 163,666.34 163,670.90 163,670.90 163,454.73 163,454.73 163,221.25 163,221.25 163,185.91 163,185.91 163,377.48 163,377.48 163,615.09 163,615.09
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,970,000 1,970,000 1,975,330.14 1,975,330.14 1,978,053.30 1,978,053.30 1,978,108.37 1,978,108.37 1,975,495.79 1,975,495.79 1,972,673.96 1,972,673.96 1,972,246.93 1,972,246.93 1,974,562.20 1,974,562.20 1,977,433.89 1,977,433.89
137 Strip Bearing Buah 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
138 Tiang Pancang Baja Diameter 400 M' 698,000 698,000 699,888.55 699,888.55 700,853.40 700,853.40 700,872.91 700,872.91 699,947.24 699,947.24 698,947.42 698,947.42 698,796.12 698,796.12 699,616.46 699,616.46 700,633.94 700,633.94
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 853,000 853,000 855,307.92 855,307.92 856,487.04 856,487.04 856,510.88 856,510.88 855,379.65 855,379.65 854,157.81 854,157.81 853,972.91 853,972.91 854,975.41 854,975.41 856,218.84 856,218.84
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,784,000 1,784,000 1,788,826.89 1,788,826.89 1,791,292.94 1,791,292.94 1,791,342.81 1,791,342.81 1,788,976.89 1,788,976.89 1,786,421.50 1,786,421.50 1,786,034.78 1,786,034.78 1,788,131.46 1,788,131.46 1,790,732.01 1,790,732.01
HARGA SATUAN DASAR UPAH KABUPATEN TULUNGAGUNG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
2 Tukang OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
3 Mandor OH 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 149,385.64
4 Operator OH 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 307,794.57
5 Pembantu Operator OH 192,799.71 192,799.71 192,604.85 192,604.85 192,324.68 192,324.68 192,218.97 192,218.97 192,381.78 192,381.78 192,657.95 192,657.95 192,790.83 192,790.83 192,496.93 192,496.93
6 Sopir OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70
7 Pembantu Sopir OH 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 125,323.52
8 Mekanik OH 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 173,447.75
9 Pembantu Mekanik OH 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 125,323.52
10 Kepala Tukang OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70
11 Pemasak Aspal OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70

HARGA SATUAN DASAR ALAT KABUPATEN TULUNGAGUNG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 453,595.96 506,099.24 453,137.53 505,587.74 452,478.37 504,852.28 452,229.67 504,574.79 452,612.71 505,002.17 453,262.44 505,727.11 453,575.08 506,075.94 452,883.62 920,440.17
2 Asphalt Distribution Unit/Jam 279,284.14 359,491.12 279,001.88 359,127.80 278,596.02 358,605.39 278,442.89 358,408.28 278,678.74 358,711.86 279,078.79 359,226.80 279,271.28 359,474.58 278,845.54 614,530.31
3 Asphalt Finisher Unit/Jam 205,129.39 973,036.03 204,922.07 972,052.62 204,623.97 970,638.60 204,511.50 970,105.10 204,684.73 970,926.79 204,978.56 972,320.57 205,119.94 972,991.24 204,807.24 1,159,244.48
4 Asphalt Liquid Mixer Unit/Jam 73,191.71 133,553.97 73,117.73 133,418.99 73,011.37 133,224.91 72,971.24 133,151.68 73,033.05 133,264.46 73,137.89 133,455.76 73,188.34 133,547.82 73,076.76 200,330.04
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 98,230.97 98,230.97 98,131.70 98,131.70 97,988.95 97,988.95 97,935.09 97,935.09 98,018.04 98,018.04 98,158.75 98,158.75 98,226.45 98,226.45 98,076.71 187,978.71
6 Asphalt Mixing Plant Unit/Jam 1,097,875.58 6,010,804.72 1,096,766.01 6,004,729.85 1,095,170.57 5,995,994.92 1,094,568.62 5,992,699.28 1,095,495.73 5,997,775.17 1,097,068.33 6,006,385.06 1,097,825.04 6,010,528.03 1,096,151.44 7,006,152.28
7 Asphalt Sprayer Unit/Jam 90,526.58 90,526.58 90,435.09 90,435.09 90,303.54 90,303.54 90,253.90 90,253.90 90,330.35 90,330.35 90,460.02 90,460.02 90,522.42 90,522.42 90,384.42 173,235.29
8 Asphalt Tanker Unit/Jam 423,741.45 491,036.76 423,313.19 490,540.49 422,697.41 489,826.91 422,465.08 489,557.68 422,822.91 489,972.34 423,429.88 490,675.71 423,721.95 491,014.16 423,075.99 878,078.19
9 Blending Equipment Unit/Jam 137,715.97 217,903.84 137,576.79 217,683.61 137,376.66 217,366.95 137,301.15 217,247.48 137,417.45 217,431.49 137,614.71 217,743.62 137,709.63 217,893.81 137,499.70 343,600.72
10 Bore Pile Machine Unit/Jam 379,441.21 659,736.50 379,057.72 659,069.74 378,506.32 658,111.00 378,298.28 657,749.28 378,618.70 658,306.40 379,162.21 659,251.41 379,423.74 659,706.13 378,845.32 1,005,968.96
11 Bore Pile Machine Dia 60 Unit/Jam 248,466.58 751,115.53 248,215.46 750,356.41 247,854.39 749,264.89 247,718.16 748,853.06 247,927.98 749,487.35 248,283.89 750,563.25 248,455.14 751,080.96 248,076.38 977,335.15
12 Bore Pile Machine Dia 80 Unit/Jam 982,309.73 982,309.73 981,316.95 981,316.95 979,889.45 979,889.45 979,350.87 979,350.87 980,180.39 980,180.39 981,587.45 981,587.45 982,264.51 982,264.51 980,767.08 1,879,787.14
13 Bulldozer 100-150 HP Unit/Jam 385,219.50 558,315.82 384,830.18 557,751.56 384,270.37 556,940.21 384,059.16 556,634.09 384,384.47 557,105.57 384,936.26 557,905.30 385,201.77 558,290.12 384,614.54 909,995.91
14 Cement Tanker Unit/Jam 358,254.14 461,915.97 357,892.06 461,449.13 357,371.45 460,777.87 357,175.02 460,524.61 357,477.55 460,914.68 357,990.72 461,576.33 358,237.65 461,894.71 357,691.52 789,068.46
15 Cold Milling Unit/Jam 559,531.33 1,190,939.87 558,965.83 1,189,736.24 558,152.72 1,188,005.56 557,845.94 1,187,352.58 558,318.44 1,188,358.28 559,119.91 1,190,064.19 559,505.57 1,190,885.05 558,652.62 1,701,158.45
16 Cold Recycler Unit/Jam 4,712,197.56 4,712,197.56 4,707,435.14 4,707,435.14 4,700,587.35 4,700,587.35 4,698,003.72 4,698,003.72 4,701,982.99 4,701,982.99 4,708,732.75 4,708,732.75 4,711,980.65 4,711,980.65 4,704,797.37 9,017,449.47
17 Compressor 4000-6500 L\M Unit/Jam 143,494.26 143,494.26 143,349.24 143,349.24 143,140.71 143,140.71 143,062.04 143,062.04 143,183.21 143,183.21 143,388.76 143,388.76 143,487.66 143,487.66 143,268.92 274,596.36
18 Concrete Breaker Unit/Jam 522,935.47 997,135.99 522,406.97 996,128.23 521,647.03 994,679.19 521,360.32 994,132.47 521,801.91 994,974.52 522,550.97 996,402.82 522,911.40 997,090.09 522,114.24 1,474,166.03
19 Concrete Mixer (350) Unit/Jam 97,267.92 97,267.92 97,169.62 97,169.62 97,028.27 97,028.27 96,974.94 96,974.94 97,057.08 97,057.08 97,196.40 97,196.40 97,263.45 97,263.45 97,115.17 186,135.79
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 110,750.61 110,750.61 110,638.68 110,638.68 110,477.73 110,477.73 110,417.01 110,417.01 110,510.53 110,510.53 110,669.17 110,669.17 110,745.51 110,745.51 110,576.68 211,936.79
21 Concrete Pan Mixer Unit/Jam 294,692.92 630,615.71 294,395.09 629,978.38 293,966.84 629,061.96 293,805.26 628,716.21 294,054.12 629,248.74 294,476.24 630,152.03 294,679.35 630,586.69 294,230.12 899,331.39
22 Concrete Pump Unit/Jam 224,390.36 240,999.64 224,163.58 240,756.07 223,837.49 240,405.85 223,714.46 240,273.71 223,903.95 240,477.22 224,225.37 240,822.43 224,380.03 240,988.54 224,037.97 445,985.55
23 Concrete Vibrator Unit/Jam 83,785.24 83,785.24 83,700.56 83,700.56 83,578.81 83,578.81 83,532.87 83,532.87 83,603.62 83,603.62 83,723.64 83,723.64 83,781.38 83,781.38 83,653.66 160,334.79
24 Crane 10-15 Ton Unit/Jam 300,471.21 300,471.21 300,167.54 300,167.54 299,730.89 299,730.89 299,566.15 299,566.15 299,819.88 299,819.88 300,250.28 300,250.28 300,457.38 300,457.38 299,999.34 574,993.71
25 Crane On Track 35 Ton Unit/Jam 249,429.63 473,965.95 249,177.54 473,486.93 248,815.07 472,798.16 248,678.31 472,538.30 248,888.94 472,938.54 249,246.23 473,617.45 249,418.15 473,944.13 249,037.92 701,502.20
26 Crane On Track 75-100 Ton Unit/Jam 391,960.84 594,465.77 391,564.71 593,864.97 390,995.11 593,001.09 390,780.20 592,675.15 391,111.20 593,177.15 391,672.64 594,028.67 391,942.80 594,438.40 391,345.30 952,258.83
27 Dump Truck 10 Ton Unit/Jam 370,773.77 398,653.56 370,399.05 398,250.66 369,860.24 397,671.34 369,656.95 397,452.76 369,970.05 397,789.41 370,501.15 398,360.44 370,756.70 398,635.21 370,191.50 737,363.51
28 Dump Truck 3-4 M3 Unit/Jam 202,240.24 265,099.60 202,035.84 264,831.67 201,741.95 264,446.43 201,631.06 264,301.08 201,801.85 264,524.95 202,091.53 264,904.68 202,230.93 265,087.40 201,922.63 449,775.64
29 Excavator 80-140 HP Unit/Jam 292,766.82 464,928.46 292,470.93 464,458.58 292,045.48 463,782.94 291,884.96 463,528.03 292,132.19 463,920.65 292,551.55 464,586.61 292,753.35 464,907.06 292,307.05 732,141.56
30 Flat Bed Truck 3-4 M3 Unit/Jam 355,364.99 474,970.12 355,005.84 474,490.08 354,489.42 473,799.85 354,294.58 473,539.44 354,594.67 473,940.53 355,103.70 474,620.88 355,348.63 474,948.25 354,806.91 799,457.93
31 Fulvi Mixer Unit/Jam 889,857.05 1,389,764.57 888,957.71 1,388,359.99 887,664.56 1,386,340.38 887,176.67 1,385,578.39 887,928.12 1,386,751.99 889,202.75 1,388,742.69 889,816.09 1,389,700.59 888,459.59 2,201,988.44
32 Generator Set Unit/Jam 395,813.04 419,741.03 395,413.01 419,316.82 394,837.81 418,706.85 394,620.79 418,476.71 394,955.04 418,831.17 395,522.00 419,432.40 395,794.82 419,721.71 395,191.44 781,334.06
33 Hot Recycler Unit/Jam 2,907,444.19 8,526,366.30 2,904,505.76 8,517,749.06 2,900,280.65 8,505,358.49 2,898,686.54 8,500,683.61 2,901,141.76 8,507,883.80 2,905,306.39 8,520,096.98 2,907,310.36 8,525,973.81 2,902,878.25 11,173,899.30
34 Jack Hammer Unit/Jam 54,893.78 54,893.78 54,838.30 54,838.30 54,758.53 54,758.53 54,728.43 54,728.43 54,774.79 54,774.79 54,853.42 54,853.42 54,891.25 54,891.25 54,807.57 105,046.93
35 Launching Gantry Unit/Jam 69,858,593.72 69,858,593.72 69,787,990.57 69,787,990.57 69,686,471.66 69,686,471.66 69,648,169.25 69,648,169.25 69,707,162.12 69,707,162.12 69,807,227.70 69,807,227.70 69,855,377.96 69,855,377.96 69,748,885.46 133,684,195.25
36 Motor Grader > 100 HP Unit/Jam 274,468.90 460,911.80 274,191.50 460,445.98 273,792.64 459,776.18 273,642.15 459,523.47 273,873.93 459,912.69 274,267.08 460,572.90 274,456.26 460,890.59 274,037.86 711,384.75
37 Pedestrian Roller Unit/Jam 90,526.58 90,526.58 90,435.09 90,435.09 90,303.54 90,303.54 90,253.90 90,253.90 90,330.35 90,330.35 90,460.02 90,460.02 90,522.42 90,522.42 90,384.42 173,235.29
38 Pile Driver + Hammer Unit/Jam 103,046.22 301,249.55 102,942.07 300,945.08 102,792.33 300,507.31 102,735.83 300,342.14 102,822.84 300,596.53 102,970.45 301,028.04 103,041.47 301,235.68 102,884.39 395,085.42
39 Rock Drill Breaker Unit/Jam 100,157.07 325,349.51 100,055.85 325,020.69 99,910.30 324,547.89 99,855.38 324,369.51 99,939.96 324,644.25 100,083.43 325,110.28 100,152.46 325,334.53 99,999.78 416,503.36
40 Split Form Paver Unit/Jam 211,870.73 211,870.73 211,656.60 211,656.60 211,348.71 211,348.71 211,232.54 211,232.54 211,411.46 211,411.46 211,714.94 211,714.94 211,860.97 211,860.97 211,538.00 405,444.28
41 Stone Crusher Unit/Jam 567,235.72 706,932.27 566,662.44 706,217.80 565,838.13 705,190.48 565,527.12 704,802.88 566,006.13 705,399.86 566,818.64 706,412.47 567,209.61 706,899.72 566,344.91 1,224,962.09
42 Tamper Unit/Jam 84,748.29 84,748.29 84,662.64 84,662.64 84,539.48 84,539.48 84,493.02 84,493.02 84,564.58 84,564.58 84,685.98 84,685.98 84,744.39 84,744.39 84,615.20 162,177.71
43 Tandem Roller 6-8 T Unit/Jam 409,295.72 477,982.61 408,882.06 477,499.53 408,287.27 476,804.93 408,062.86 476,542.86 408,408.50 476,946.49 408,994.77 477,631.16 409,276.88 477,960.61 408,652.95 851,823.66
44 Three Wheel Roller 6-8 T Unit/Jam 135,789.87 171,712.24 135,652.64 171,538.70 135,455.31 171,289.17 135,380.86 171,195.02 135,495.52 171,340.02 135,690.03 171,585.98 135,783.62 171,704.34 135,576.63 295,718.88
45 Tire Roller 8-10 T Unit/Jam 242,688.29 437,816.01 242,443.01 437,373.52 242,090.34 436,737.29 241,957.27 436,497.24 242,162.21 436,866.96 242,509.84 437,494.09 242,677.12 437,795.85 242,307.16 659,239.28
46 Track Loader 75-100 HP Unit/Jam 227,279.51 299,241.21 227,049.80 298,938.78 226,719.52 298,503.93 226,594.91 298,339.86 226,786.84 298,592.55 227,112.39 299,021.19 227,269.04 299,227.44 226,922.58 506,779.84
47 Trailer 20 Ton Unit/Jam 366,921.58 507,103.40 366,550.74 506,590.89 366,017.53 505,853.97 365,816.35 505,575.93 366,126.20 506,004.16 366,651.78 506,730.54 366,904.69 507,080.06 366,345.35 842,117.46
48 Trailler 15 Ton Unit/Jam 317,806.09 483,003.44 317,484.90 482,515.29 317,023.06 481,813.38 316,848.81 481,548.56 317,117.19 481,956.44 317,572.41 482,648.29 317,791.46 482,981.20 317,307.00 773,104.34
49 Truck Mixer (agitator) Unit/Jam 399,665.23 587,436.61 399,261.31 586,842.92 398,680.51 585,989.25 398,461.38 585,667.17 398,798.88 586,163.23 399,371.37 587,004.68 399,646.84 587,409.57 399,037.59 952,291.85
50 Vibrating Rammer Unit/Jam 81,859.14 81,859.14 81,776.41 81,776.41 81,657.45 81,657.45 81,612.57 81,612.57 81,681.70 81,681.70 81,798.95 81,798.95 81,855.38 81,855.38 81,730.59 156,648.93
51 Vibratory Roller 5-8 T Unit/Jam 197,424.99 423,757.69 197,225.47 423,329.42 196,938.57 422,713.61 196,830.32 422,481.27 196,997.04 422,839.12 197,279.83 423,446.11 197,415.91 423,738.19 197,114.95 603,777.61
52 Water Pump 70-100 MM Unit/Jam 61,635.12 61,635.12 61,572.83 61,572.83 61,483.26 61,483.26 61,449.47 61,449.47 61,501.51 61,501.51 61,589.80 61,589.80 61,632.28 61,632.28 61,538.33 117,947.43
53 Water Tanker 3000-4500 L Unit/Jam 223,427.31 223,427.31 223,201.50 223,201.50 222,876.82 222,876.82 222,754.32 222,754.32 222,942.99 222,942.99 223,263.03 223,263.03 223,417.03 223,417.03 223,076.43 427,559.43
54 Welding Set Unit/Jam 125,196.34 125,196.34 125,069.81 125,069.81 124,887.87 124,887.87 124,819.23 124,819.23 124,924.95 124,924.95 125,104.28 125,104.28 125,190.58 125,190.58 124,999.73 239,580.71
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 217,649.02 346,436.98 217,429.05 346,086.85 217,112.76 345,583.40 216,993.43 345,393.46 217,177.22 345,686.01 217,488.98 346,182.25 217,639.00 346,421.03 217,307.22 545,087.56
HARGA SATUAN DASAR BAHAN KABUPATEN TULUNGAGUNG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
2 Agregat Pecah Mesin 20-30 mm M3 289,199.56 289,199.56 288,907.28 288,907.28 288,487.02 288,487.02 288,328.45 288,328.45 288,572.67 288,572.67 288,986.92 288,986.92 289,186.25 289,186.25 288,745.39 553,423.84
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 331,374.50 331,374.50 331,039.59 331,039.59 330,558.04 330,558.04 330,376.35 330,376.35 330,656.18 330,656.18 331,130.84 331,130.84 331,359.25 331,359.25 330,854.10 634,131.48
4 Bahan Agr. Base Kelas A M3 317,316.19 317,316.19 316,995.49 316,995.49 316,534.36 316,534.36 316,360.38 316,360.38 316,628.35 316,628.35 317,082.87 317,082.87 317,301.58 317,301.58 316,817.86 607,228.93
5 Bahan Agr. Base Kelas B M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
6 Bahan Agr. Base Kelas C M3 274,137.09 274,137.09 273,860.03 273,860.03 273,461.65 273,461.65 273,311.34 273,311.34 273,542.84 273,542.84 273,935.52 273,935.52 274,124.47 274,124.47 273,706.57 524,599.68
7 Bahan Agr. Base Kelas C2 M3 250,037.12 250,037.12 249,784.42 249,784.42 249,421.07 249,421.07 249,283.97 249,283.97 249,495.12 249,495.12 249,853.27 249,853.27 250,025.61 250,025.61 249,644.46 478,481.02
8 Bahan Agr. Base Kelas S M3 202,841.36 202,841.36 202,636.36 202,636.36 202,341.59 202,341.59 202,230.37 202,230.37 202,401.66 202,401.66 202,692.21 202,692.21 202,832.02 202,832.02 202,522.81 388,165.33
9 Bahan Pilihan M3 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
10 Bahan Tanah Timbunan M3 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 220,985.21
11 Batu Belah/Kerakal M3 326,353.67 326,353.67 326,023.84 326,023.84 325,549.58 325,549.58 325,370.65 325,370.65 325,646.24 325,646.24 326,113.71 326,113.71 326,338.65 326,338.65 325,841.16 624,523.43
12 Batu Kali M3 359,491.12 359,491.12 359,127.80 359,127.80 358,605.39 358,605.39 358,408.28 358,408.28 358,711.86 358,711.86 359,226.80 359,226.80 359,474.58 359,474.58 358,926.57 687,936.57
13 Chipping M3 213,887.18 213,887.18 213,671.01 213,671.01 213,360.19 213,360.19 213,242.92 213,242.92 213,423.54 213,423.54 213,729.91 213,729.91 213,877.33 213,877.33 213,551.28 409,303.05
14 Chipping (kg) Kg 262.09 262.09 261.82 261.82 261.44 261.44 261.30 261.30 261.52 261.52 261.89 261.89 262.08 262.08 261.68 501.54
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 384,595.25 384,595.25 384,206.56 384,206.56 383,647.66 383,647.66 383,436.79 383,436.79 383,761.57 383,761.57 384,312.47 384,312.47 384,577.55 384,577.55 383,991.27 735,976.84
18 Kapur M3 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
19 Pasir Beton (Kasar) M3 457,899.31 457,899.31 457,436.53 457,436.53 456,771.11 456,771.11 456,520.05 456,520.05 456,906.73 456,906.73 457,562.62 457,562.62 457,878.23 457,878.23 457,180.21 876,254.41
20 Pasir Halus (untuk HRS) M3 289,199.56 289,199.56 288,907.28 288,907.28 288,487.02 288,487.02 288,328.45 288,328.45 288,572.67 288,572.67 288,986.92 288,986.92 289,186.25 289,186.25 288,745.39 553,423.84
21 Pasir Pasang (Sedang) M3 323,341.18 323,341.18 323,014.39 323,014.39 322,544.51 322,544.51 322,367.23 322,367.23 322,640.28 322,640.28 323,103.43 323,103.43 323,326.29 323,326.29 322,833.39 618,758.59
22 Pasir Urug M3 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
23 Pasir Urug (ada unsur lempung) M3 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
24 Sirtu M3 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
26 Anti Pengelupas Liter 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
27 Arbocell Kg 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17 136,351.99 261,339.03
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 568,198.77 568,198.77 567,624.51 567,624.51 566,798.80 566,798.80 566,487.27 566,487.27 566,967.09 566,967.09 567,780.98 567,780.98 568,172.61 568,172.61 567,306.45 1,087,327.85
41 Beton K-125 (fc' 10 MPa) M3 587,459.74 587,459.74 586,866.02 586,866.02 586,012.32 586,012.32 585,690.23 585,690.23 586,186.31 586,186.31 587,027.79 587,027.79 587,432.70 587,432.70 586,537.17 1,124,186.43
42 Beton K-175 (fc' 15 MPa) M3 635,612.18 635,612.18 634,969.79 634,969.79 634,046.12 634,046.12 633,697.62 633,697.62 634,234.37 634,234.37 635,144.82 635,144.82 635,582.92 635,582.92 634,613.99 1,216,332.85
43 Beton K-250 (fc' 20 MPa) M3 707,840.84 707,840.84 707,125.45 707,125.45 706,096.81 706,096.81 705,708.71 705,708.71 706,306.46 706,306.46 707,320.37 707,320.37 707,808.25 707,808.25 706,729.22 1,354,552.50
44 Beton K-300 (fc' 25 MPa) M3 736,732.30 736,732.30 735,987.71 735,987.71 734,917.09 734,917.09 734,513.15 734,513.15 735,135.29 735,135.29 736,190.59 736,190.59 736,698.38 736,698.38 735,575.31 1,409,840.35
45 Beton K-350 (fc' 30 MPa) M3 765,623.76 765,623.76 764,849.98 764,849.98 763,737.37 763,737.37 763,317.59 763,317.59 763,964.13 763,964.13 765,060.81 765,060.81 765,588.52 765,588.52 764,421.40 1,465,128.21
46 Beton K-400 (fc' 35 MPa) M3 794,515.22 794,515.22 793,712.24 793,712.24 792,557.65 792,557.65 792,122.03 792,122.03 792,792.96 792,792.96 793,931.03 793,931.03 794,478.65 794,478.65 793,267.49 1,520,416.07
47 Beton K-450 (fc' 40 MPa) M3 833,037.17 833,037.17 832,195.26 832,195.26 830,984.68 830,984.68 830,527.94 830,527.94 831,231.41 831,231.41 832,424.65 832,424.65 832,998.83 832,998.83 831,728.94 1,594,133.21
48 Beton K-500 (fc' 45 MPa) M3 866,743.88 866,743.88 865,867.90 865,867.90 864,608.34 864,608.34 864,133.12 864,133.12 864,865.05 864,865.05 866,106.58 866,106.58 866,703.98 866,703.98 865,382.72 1,658,635.71
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
51 Cat Anti Karat Kg 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
52 Cat Marka (Non Thermoplas) Kg 52,216.59 52,216.59 52,163.81 52,163.81 52,087.93 52,087.93 52,059.30 52,059.30 52,103.40 52,103.40 52,178.19 52,178.19 52,214.18 52,214.18 52,134.59 99,923.75
53 Cat Marka (Thermoplastic) Kg 54,224.92 54,224.92 54,170.12 54,170.12 54,091.32 54,091.32 54,061.58 54,061.58 54,107.38 54,107.38 54,185.05 54,185.05 54,222.42 54,222.42 54,139.76 103,766.97
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,257,214.77 1,257,214.77 1,255,944.15 1,255,944.15 1,254,117.16 1,254,117.16 1,253,427.85 1,253,427.85 1,254,489.52 1,254,489.52 1,256,290.36 1,256,290.36 1,257,156.90 1,257,156.90 1,255,240.40 2,405,856.40
57 Curing Compound Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 587,436.61 587,436.61 586,842.92 586,842.92 585,989.25 585,989.25 585,667.17 585,667.17 586,163.23 586,163.23 587,004.68 587,004.68 587,409.57 587,409.57 586,514.08 1,124,142.17
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 683,836.47 683,836.47 683,145.34 683,145.34 682,151.59 682,151.59 681,776.65 681,776.65 682,354.12 682,354.12 683,333.65 683,333.65 683,804.99 683,804.99 682,762.55 1,308,616.78
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 866,594.53 866,594.53 865,718.69 865,718.69 864,459.35 864,459.35 863,984.21 863,984.21 864,716.02 864,716.02 865,957.33 865,957.33 866,554.63 866,554.63 865,233.60 1,658,349.90
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
64 Oxygen (Isi 6 M3) Botol 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,328,510.49 1,328,510.49 1,327,167.82 1,327,167.82 1,325,237.23 1,325,237.23 1,324,508.82 1,324,508.82 1,325,630.70 1,325,630.70 1,327,533.66 1,327,533.66 1,328,449.34 1,328,449.34 1,326,424.16 2,542,290.75
67 Seal Coat M2 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
68 Seal Guard Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
69 Semen/PC (50 kg) Zak 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
70 Semen/PC (kg) Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12 1,002.59 1,921.61
71 Slurry Seal Ton 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
72 Solar Liter 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
73 Thinner Liter 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21 27,069.88 51,883.48
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 11,045.82 9,037.49 11,034.65 9,028.35 11,018.60 9,015.22 11,012.55 9,010.26 11,021.87 9,017.90 11,037.69 9,030.84 11,045.31 9,037.07 11,028.47 19,132.54
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
85 Besi Beton Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,519,931.10 12,519,931.10 12,507,277.73 12,507,277.73 12,489,083.70 12,489,083.70 12,482,219.21 12,482,219.21 12,492,791.80 12,492,791.80 12,510,725.38 12,510,725.38 12,519,354.78 12,519,354.78 12,500,269.38 23,958,640.23
87 Box Culvert Type DUB 200×200 M' 13,290,125.77 13,290,125.77 13,276,694.00 13,276,694.00 13,257,380.71 13,257,380.71 13,250,093.94 13,250,093.94 13,261,316.93 13,261,316.93 13,280,353.73 13,280,353.73 13,289,513.99 13,289,513.99 13,269,254.52 25,432,515.51
88 Box Culvert Type uk 300×200 M' 14,349,520.00 14,349,520.00 14,335,017.55 14,335,017.55 14,314,164.74 14,314,164.74 14,306,297.12 14,306,297.12 14,318,414.73 14,318,414.73 14,338,969.01 14,338,969.01 14,348,859.46 14,348,859.46 14,326,985.04 27,459,814.64
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
91 Ducting (Strand Prestress) M' 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,095,692.67 2,095,692.67 2,093,574.64 2,093,574.64 2,090,529.17 2,090,529.17 2,089,380.13 2,089,380.13 2,091,149.86 2,091,149.86 2,094,151.74 2,094,151.74 2,095,596.20 2,095,596.20 2,092,401.52 4,010,401.20
94 Expansion Join Tipe Rubber M' 1,517,293.54 1,517,293.54 1,515,760.08 1,515,760.08 1,513,555.14 1,513,555.14 1,512,723.23 1,512,723.23 1,514,004.52 1,514,004.52 1,516,177.90 1,516,177.90 1,517,223.70 1,517,223.70 1,514,910.73 2,903,553.53
95 Expansion Join Tipe Torma M' 1,740,218.21 1,740,218.21 1,738,459.44 1,738,459.44 1,735,930.55 1,735,930.55 1,734,976.41 1,734,976.41 1,736,445.96 1,736,445.96 1,738,938.65 1,738,938.65 1,740,138.10 1,740,138.10 1,737,485.31 3,330,151.07
96 Expansion Tipe Joint Asphaltic Plug M' 2,064,563.55 2,064,563.55 2,062,476.98 2,062,476.98 2,059,476.75 2,059,476.75 2,058,344.78 2,058,344.78 2,060,088.22 2,060,088.22 2,063,045.51 2,063,045.51 2,064,468.51 2,064,468.51 2,061,321.29 3,950,831.27
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
99 Glass Bead Kg 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
100 Joint Sealent Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
101 Joint Socket Pile 16×16×16 Set 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
102 Joint Socket Pile 35×35 Set 753,123.86 753,123.86 752,362.71 752,362.71 751,268.27 751,268.27 750,855.34 750,855.34 751,491.33 751,491.33 752,570.10 752,570.10 753,089.20 753,089.20 751,941.13 1,441,207.91
103 Kawat Beton Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
104 Kawat Bronjong Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
105 Kawat Las Dos 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 332,438.62
106 Kayu Acuan (Kelas III/Meranti) M3 4,141,177.08 4,141,177.08 4,136,991.77 4,136,991.77 4,130,973.79 4,130,973.79 4,128,703.24 4,128,703.24 4,132,200.30 4,132,200.30 4,138,132.13 4,138,132.13 4,140,986.45 4,140,986.45 4,134,673.64 7,924,721.87
107 Kayu Perancah (Gelam) M3 2,668,066.81 2,668,066.81 2,665,370.30 2,665,370.30 2,661,493.05 2,661,493.05 2,660,030.19 2,660,030.19 2,662,283.27 2,662,283.27 2,666,105.01 2,666,105.01 2,667,943.99 2,667,943.99 2,663,876.78 5,105,719.21
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
110 Marmer Nama Jembatan Buah 577,394.96 577,394.96 576,811.41 576,811.41 575,972.34 575,972.34 575,655.76 575,655.76 576,143.35 576,143.35 576,970.41 576,970.41 577,368.38 577,368.38 576,488.20 1,104,926.06
111 Mata Kucing Buah 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
112 Matras Concrete (Tebal=10 cm) M2 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
113 Mini Pile 16×16×16 M' 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
114 Mini Timber Pile Buah 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
115 Multipleks 12 mm Lbr 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 355,497.95
116 Paku Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
117 Paving Block (Model Bata 8 cm) M2 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,021,553.35 64,021,553.35 63,956,849.46 63,956,849.46 63,863,812.97 63,863,812.97 63,828,710.93 63,828,710.93 63,882,774.63 63,882,774.63 63,974,479.23 63,974,479.23 64,018,606.29 64,018,606.29 63,921,011.78 122,514,201.67
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 90,697,200.59 90,697,200.59 90,605,536.74 90,605,536.74 90,473,735.04 90,473,735.04 90,424,007.15 90,424,007.15 90,500,597.40 90,500,597.40 90,630,512.25 90,630,512.25 90,693,025.58 90,693,025.58 90,554,766.69 173,561,785.71
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 173,349,029.98 173,349,029.98 173,173,833.40 173,173,833.40 172,921,921.60 172,921,921.60 172,826,876.96 172,826,876.96 172,973,263.46 172,973,263.46 173,221,568.95 173,221,568.95 173,341,050.31 173,341,050.31 173,076,796.90 331,727,627.75
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 227,319,894.34 227,319,894.34 227,090,151.68 227,090,151.68 226,759,809.10 226,759,809.10 226,635,173.06 226,635,173.06 226,827,135.85 226,827,135.85 227,152,749.32 227,152,749.32 227,309,430.26 227,309,430.26 226,962,903.62 435,008,429.52
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 289,771,937.57 289,771,937.57 289,479,077.25 289,479,077.25 289,057,979.01 289,057,979.01 288,899,101.45 288,899,101.45 289,143,802.56 289,143,802.56 289,558,872.46 289,558,872.46 289,758,598.67 289,758,598.67 289,316,870.08 554,519,153.92
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 349,610,138.90 349,610,138.90 349,256,802.63 349,256,802.63 348,748,747.17 348,748,747.17 348,557,061.23 348,557,061.23 348,852,293.38 348,852,293.38 349,353,075.63 349,353,075.63 349,594,045.51 349,594,045.51 349,061,099.52 669,027,926.08
124 Pelat Rambu (Eng. Grade) Buah 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
125 Pelat Rambu (High L Grade) Buah 235,978.81 235,978.81 235,740.32 235,740.32 235,397.39 235,397.39 235,268.01 235,268.01 235,467.28 235,467.28 235,805.30 235,805.30 235,967.95 235,967.95 235,608.22 451,578.48
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 265,099.60 265,099.60 264,831.67 264,831.67 264,446.43 264,446.43 264,301.08 264,301.08 264,524.95 264,524.95 264,904.68 264,904.68 265,087.40 265,087.40 264,683.28 507,305.18
129 Pipa Galvanis Dia 1,5" M' 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
130 Pipa Galvanis Dia 2" M' 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
131 Pipa Galvanis Dia 3" M' 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
132 Pipa Porus M' 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
133 Pipa PVC Dia 4" M' 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
134 Plastik Filter M2 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
135 Rel Pengaman M' 163,678.92 163,678.92 163,513.50 163,513.50 163,275.64 163,275.64 163,185.89 163,185.89 163,324.11 163,324.11 163,558.57 163,558.57 163,671.39 163,671.39 163,421.87 313,222.52
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,978,205.35 1,978,205.35 1,976,206.06 1,976,206.06 1,973,331.32 1,973,331.32 1,972,246.70 1,972,246.70 1,973,917.22 1,973,917.22 1,976,750.80 1,976,750.80 1,978,114.29 1,978,114.29 1,975,098.71 3,785,572.77
137 Strip Bearing Buah 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
138 Tiang Pancang Baja Diameter 400 M' 700,907.28 700,907.28 700,198.90 700,198.90 699,180.34 699,180.34 698,796.04 698,796.04 699,387.93 699,387.93 700,391.91 700,391.91 700,875.01 700,875.01 699,806.55 1,341,284.16
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 856,552.87 856,552.87 855,687.19 855,687.19 854,442.44 854,442.44 853,972.81 853,972.81 854,696.13 854,696.13 855,923.06 855,923.06 856,513.44 856,513.44 855,207.71 1,639,133.79
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,791,430.63 1,791,430.63 1,789,620.11 1,789,620.11 1,787,016.79 1,787,016.79 1,786,034.57 1,786,034.57 1,787,547.37 1,787,547.37 1,790,113.42 1,790,113.42 1,791,348.17 1,791,348.17 1,788,617.31 3,428,153.21
HARGA SATUAN DASAR UPAH KABUPATEN TRENGGALEK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 108,000 108,000 108,292.21 108,292.21 108,441.50 108,441.50 108,444.52 108,444.52 108,301.29 108,301.29 108,146.59 108,146.59 108,123.18 108,123.18 108,250.11 108,250.11 108,407.54 108,407.54
2 Tukang OH 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
3 Mandor OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
4 Operator OH 287,000 287,000 287,776.52 287,776.52 288,173.25 288,173.25 288,181.27 288,181.27 287,800.66 287,800.66 287,389.56 287,389.56 287,327.34 287,327.34 287,664.65 287,664.65 288,083.01 288,083.01
5 Pembantu Operator OH 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
6 Sopir OH 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
7 Pembantu Sopir OH 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
8 Mekanik OH 161,000 161,000 161,435.61 161,435.61 161,658.16 161,658.16 161,662.66 161,662.66 161,449.15 161,449.15 161,218.53 161,218.53 161,183.63 161,183.63 161,372.85 161,372.85 161,607.54 161,607.54
9 Pembantu Mekanik OH 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
10 Kepala Tukang OH 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
11 Pemasak Aspal OH 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66

HARGA SATUAN DASAR ALAT KABUPATEN TRENGGALEK TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 421,967 422,000 423,108.32 423,141.79 423,691.62 423,725.12 423,703.41 423,736.92 423,143.81 423,177.27 422,539.38 422,572.80 422,447.91 422,481.32 422,943.84 422,977.28 423,558.94 423,592.44
2 Asphalt Distribution Unit/Jam 259,810 259,810 260,512.56 260,512.56 260,871.70 260,871.70 260,878.96 260,878.96 260,534.40 260,534.40 260,162.25 260,162.25 260,105.93 260,105.93 260,411.28 260,411.28 260,790.01 260,790.01
3 Asphalt Finisher Unit/Jam 190,826 191,000 191,341.98 191,516.78 191,605.76 191,780.80 191,611.10 191,786.14 191,358.03 191,532.84 191,084.69 191,259.25 191,043.32 191,217.85 191,267.59 191,442.33 191,545.76 191,720.75
4 Asphalt Liquid Mixer Unit/Jam 68,088 68,088 68,272.26 68,272.26 68,366.38 68,366.38 68,368.28 68,368.28 68,277.98 68,277.98 68,180.45 68,180.45 68,165.69 68,165.69 68,245.71 68,245.71 68,344.97 68,344.97
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 91,381 92,000 91,628.55 92,248.92 91,754.87 92,376.09 91,757.43 92,378.66 91,636.24 92,256.66 91,505.34 92,124.88 91,485.54 92,104.93 91,592.93 92,213.06 91,726.14 92,347.17
6 Asphalt Mixing Plant Unit/Jam 1,021,321 5,238,836 1,024,083.84 5,253,010.22 1,025,495.63 5,260,251.96 1,025,524.18 5,260,398.40 1,024,169.72 5,253,450.73 1,022,706.78 5,245,946.64 1,022,485.39 5,244,811.02 1,023,685.72 5,250,968.05 1,025,174.50 5,258,604.74
7 Asphalt Sprayer Unit/Jam 84,214 84,214 84,442.00 84,442.00 84,558.41 84,558.41 84,560.77 84,560.77 84,449.08 84,449.08 84,328.45 84,328.45 84,310.20 84,310.20 84,409.17 84,409.17 84,531.93 84,531.93
8 Asphalt Tanker Unit/Jam 394,194 394,194 395,260.43 395,260.43 395,805.33 395,805.33 395,816.35 395,816.35 395,293.58 395,293.58 394,728.93 394,728.93 394,643.49 394,643.49 395,106.77 395,106.77 395,681.39 395,681.39
9 Blending Equipment Unit/Jam 128,113 128,113 128,459.64 128,459.64 128,636.73 128,636.73 128,640.31 128,640.31 128,470.41 128,470.41 128,286.90 128,286.90 128,259.13 128,259.13 128,409.70 128,409.70 128,596.45 128,596.45
10 Bore Pile Machine Unit/Jam 352,983 353,000 353,937.75 353,955.10 354,425.68 354,443.05 354,435.55 354,452.92 353,967.43 353,984.78 353,461.82 353,479.14 353,385.30 353,402.62 353,800.15 353,817.49 354,314.70 354,332.06
11 Bore Pile Machine Dia 60 Unit/Jam 231,141 231,141 231,766.34 231,766.34 232,085.85 232,085.85 232,092.31 232,092.31 231,785.78 231,785.78 231,454.69 231,454.69 231,404.59 231,404.59 231,676.24 231,676.24 232,013.18 232,013.18
12 Bore Pile Machine Dia 80 Unit/Jam 913,813 913,813 916,285.54 916,285.54 917,548.72 917,548.72 917,574.27 917,574.27 916,362.38 916,362.38 915,053.44 915,053.44 914,855.35 914,855.35 915,929.33 915,929.33 917,261.40 917,261.40
13 Bulldozer 100-150 HP Unit/Jam 358,358 358,358 359,327.66 359,327.66 359,823.03 359,823.03 359,833.05 359,833.05 359,357.80 359,357.80 358,844.49 358,844.49 358,766.80 358,766.80 359,187.97 359,187.97 359,710.35 359,710.35
14 Cement Tanker Unit/Jam 333,273 333,273 334,174.73 334,174.73 334,635.42 334,635.42 334,644.73 334,644.73 334,202.75 334,202.75 333,725.37 333,725.37 333,653.13 333,653.13 334,044.81 334,044.81 334,530.63 334,530.63
15 Cold Milling Unit/Jam 520,515 520,515 521,923.43 521,923.43 522,642.95 522,642.95 522,657.50 522,657.50 521,967.20 521,967.20 521,221.62 521,221.62 521,108.78 521,108.78 521,720.53 521,720.53 522,479.29 522,479.29
16 Cold Recycler Unit/Jam 4,383,615 4,383,615 4,395,475.65 4,395,475.65 4,401,535.20 4,401,535.20 4,401,657.73 4,401,657.73 4,395,844.25 4,395,844.25 4,389,565.17 4,389,565.17 4,388,614.94 4,388,614.94 4,393,766.86 4,393,766.86 4,400,156.89 4,400,156.89
17 Compressor 4000-6500 L\M Unit/Jam 133,488 133,488 133,849.55 133,849.55 134,034.08 134,034.08 134,037.81 134,037.81 133,860.78 133,860.78 133,669.57 133,669.57 133,640.63 133,640.63 133,797.52 133,797.52 133,992.11 133,992.11
18 Concrete Breaker Unit/Jam 486,471 927,000 487,787.30 929,508.14 488,459.76 930,789.55 488,473.36 930,815.46 487,828.21 929,586.09 487,131.39 928,258.25 487,025.94 928,057.31 487,597.67 929,146.78 488,306.80 930,498.08
19 Concrete Mixer (350) Unit/Jam 90,485 90,485 90,730.24 90,730.24 90,855.31 90,855.31 90,857.84 90,857.84 90,737.84 90,737.84 90,608.23 90,608.23 90,588.62 90,588.62 90,694.96 90,694.96 90,826.86 90,826.86
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 103,028 103,028 103,306.70 103,306.70 103,449.12 103,449.12 103,452.00 103,452.00 103,315.37 103,315.37 103,167.79 103,167.79 103,145.46 103,145.46 103,266.54 103,266.54 103,416.73 103,416.73
21 Concrete Pan Mixer Unit/Jam 274,144 587,000 274,885.66 588,588.22 275,264.62 589,399.64 275,272.28 589,416.05 274,908.71 588,637.58 274,516.03 587,796.76 274,456.61 587,669.52 274,778.80 588,359.40 275,178.42 589,215.07
22 Concrete Pump Unit/Jam 208,744 224,000 209,308.36 224,606.07 209,596.91 224,915.71 209,602.75 224,921.97 209,325.92 224,624.90 209,026.91 224,304.04 208,981.66 224,255.49 209,226.99 224,518.75 209,531.28 224,845.27
23 Concrete Vibrator Unit/Jam 77,943 77,943 78,153.77 78,153.77 78,261.51 78,261.51 78,263.69 78,263.69 78,160.32 78,160.32 78,048.68 78,048.68 78,031.78 78,031.78 78,123.38 78,123.38 78,237.00 78,237.00
24 Crane 10-15 Ton Unit/Jam 279,519 279,519 280,275.58 280,275.58 280,661.96 280,661.96 280,669.78 280,669.78 280,299.08 280,299.08 279,898.70 279,898.70 279,838.11 279,838.11 280,166.62 280,166.62 280,574.07 280,574.07
25 Crane On Track 35 Ton Unit/Jam 232,037 441,000 232,664.66 442,193.19 232,985.41 442,802.80 232,991.90 442,815.12 232,684.17 442,230.27 232,351.80 441,598.59 232,301.51 441,502.99 232,574.21 442,021.29 232,912.45 442,664.13
26 Crane On Track 75-100 Ton Unit/Jam 364,629 553,000 365,615.90 554,496.23 366,119.93 555,260.65 366,130.12 555,276.11 365,646.56 554,542.73 365,124.26 553,750.61 365,045.22 553,630.74 365,473.76 554,280.66 366,005.28 555,086.77
27 Dump Truck 10 Ton Unit/Jam 344,920 371,000 345,852.88 372,003.80 346,329.67 372,516.64 346,339.31 372,527.01 345,881.88 372,034.99 345,387.82 371,503.57 345,313.05 371,423.15 345,718.42 371,859.18 346,221.21 372,399.99
28 Dump Truck 3-4 M3 Unit/Jam 188,138 191,000 188,647.02 191,516.78 188,907.09 191,780.80 188,912.35 191,786.14 188,662.84 191,532.84 188,393.35 191,259.25 188,352.57 191,217.85 188,573.68 191,442.33 188,847.94 191,720.75
29 Excavator 80-140 HP Unit/Jam 272,352 433,000 273,089.02 434,171.55 273,465.50 434,770.09 273,473.11 434,782.19 273,111.93 434,207.96 272,721.81 433,587.73 272,662.77 433,493.87 272,982.86 434,002.76 273,379.87 434,633.95
30 Flat Bed Truck 3-4 M3 Unit/Jam 330,585 442,000 331,479.77 443,195.90 331,936.74 443,806.88 331,945.98 443,819.24 331,507.57 443,233.06 331,034.04 442,599.94 330,962.38 442,504.13 331,350.90 443,023.60 331,832.80 443,667.91
31 Fulvi Mixer Unit/Jam 827,807 1,293,000 830,046.90 1,296,498.41 831,191.20 1,298,285.75 831,214.34 1,298,321.89 830,116.51 1,296,607.13 828,930.76 1,294,755.04 828,751.32 1,294,474.76 829,724.21 1,295,994.38 830,930.91 1,297,879.20
32 Generator Set Unit/Jam 368,213 391,000 369,209.17 392,057.91 369,718.16 392,598.40 369,728.45 392,609.33 369,240.14 392,090.79 368,712.71 391,530.72 368,632.89 391,445.96 369,065.64 391,905.49 369,602.39 392,475.46
33 Hot Recycler Unit/Jam 2,704,708 7,931,000 2,712,025.55 7,952,458.54 2,715,764.31 7,963,421.70 2,715,839.91 7,963,643.39 2,712,252.97 7,953,125.42 2,708,378.75 7,941,765.07 2,707,792.46 7,940,045.88 2,710,971.21 7,949,366.92 2,714,913.89 7,960,928.00
34 Jack Hammer Unit/Jam 51,066 51,066 51,204.19 51,204.19 51,274.78 51,274.78 51,276.21 51,276.21 51,208.49 51,208.49 51,135.34 51,135.34 51,124.27 51,124.27 51,184.29 51,184.29 51,258.73 51,258.73
35 Launching Gantry Unit/Jam 64,987,340 64,988,000 65,163,173.57 65,163,835.00 65,253,006.77 65,253,669.11 65,254,823.26 65,255,485.61 65,168,638.06 65,169,299.54 65,075,550.33 65,076,210.86 65,061,463.13 65,062,123.52 65,137,840.61 65,138,501.77 65,232,573.16 65,233,235.28
36 Motor Grader > 100 HP Unit/Jam 255,330 429,000 256,020.96 430,160.73 256,373.91 430,753.74 256,381.05 430,765.73 256,042.43 430,196.80 255,676.70 429,582.30 255,621.35 429,489.31 255,921.43 429,993.50 256,293.63 430,618.85
37 Pedestrian Roller Unit/Jam 84,214 84,214 84,442.00 84,442.00 84,558.41 84,558.41 84,560.77 84,560.77 84,449.08 84,449.08 84,328.45 84,328.45 84,310.20 84,310.20 84,409.17 84,409.17 84,531.93 84,531.93
38 Pile Driver + Hammer Unit/Jam 95,861 280,000 96,120.15 280,757.58 96,252.66 281,144.63 96,255.34 281,152.46 96,128.21 280,781.13 95,990.90 280,380.06 95,970.12 280,319.36 96,082.78 280,648.44 96,222.52 281,056.59
39 Rock Drill Breaker Unit/Jam 93,173 303,000 93,425.19 303,819.81 93,553.99 304,238.66 93,556.59 304,247.12 93,433.03 303,845.29 93,299.57 303,411.27 93,279.37 303,345.59 93,388.87 303,701.70 93,524.69 304,143.38
40 Split Form Paver Unit/Jam 197,097 197,097 197,630.22 197,630.22 197,902.67 197,902.67 197,908.18 197,908.18 197,646.79 197,646.79 197,364.47 197,364.47 197,321.74 197,321.74 197,553.38 197,553.38 197,840.69 197,840.69
41 Stone Crusher Unit/Jam 527,682 658,000 529,109.99 659,780.32 529,839.41 660,689.89 529,854.16 660,708.28 529,154.36 659,835.65 528,398.50 658,893.13 528,284.12 658,750.50 528,904.29 659,523.82 529,673.49 660,482.99
42 Tamper Unit/Jam 78,839 79,000 79,052.09 79,213.75 79,161.07 79,322.95 79,163.27 79,325.16 79,058.72 79,220.39 78,945.79 79,107.23 78,928.70 79,090.11 79,021.35 79,182.95 79,136.28 79,298.11
43 Tandem Roller 6-8 T Unit/Jam 380,755 444,000 381,785.64 445,201.31 382,311.97 445,815.06 382,322.61 445,827.47 381,817.66 445,238.64 381,272.27 444,602.66 381,189.73 444,506.41 381,637.22 445,028.23 382,192.25 445,675.45
44 Three Wheel Roller 6-8 T Unit/Jam 126,321 159,000 126,663.00 159,430.20 126,837.62 159,649.99 126,841.15 159,654.43 126,673.62 159,443.57 126,492.68 159,215.82 126,465.30 159,181.35 126,613.76 159,368.22 126,797.90 159,599.99
45 Tire Roller 8-10 T Unit/Jam 225,766 408,000 226,376.43 409,103.91 226,688.51 409,667.89 226,694.82 409,679.30 226,395.41 409,138.21 226,072.03 408,553.80 226,023.09 408,465.35 226,288.42 408,944.86 226,617.52 409,539.61
46 Track Loader 75-100 HP Unit/Jam 211,431 279,000 212,003.32 279,754.88 212,295.59 280,140.54 212,301.50 280,148.34 212,021.10 279,778.34 211,718.25 279,378.70 211,672.41 279,318.22 211,920.90 279,646.12 212,229.11 280,052.82
47 Trailer 20 Ton Unit/Jam 341,336 472,000 342,259.60 473,277.07 342,731.44 473,929.52 342,740.98 473,942.72 342,288.30 473,316.76 341,799.37 472,640.66 341,725.38 472,538.35 342,126.54 473,093.08 342,624.11 473,781.11
48 Trailler 15 Ton Unit/Jam 295,645 450,000 296,445.32 451,217.54 296,854.00 451,839.59 296,862.26 451,852.17 296,470.18 451,255.38 296,046.70 450,610.80 295,982.61 450,513.26 296,330.08 451,042.13 296,761.04 451,698.10
49 Truck Mixer (agitator) Unit/Jam 371,796 546,000 372,802.45 547,477.29 373,316.39 548,232.03 373,326.78 548,247.29 372,833.71 547,523.20 372,301.15 546,741.11 372,220.56 546,622.75 372,657.52 547,264.45 373,199.49 548,060.36
50 Vibrating Rammer Unit/Jam 76,151 76,151 76,357.13 76,357.13 76,462.39 76,462.39 76,464.52 76,464.52 76,363.53 76,363.53 76,254.45 76,254.45 76,237.95 76,237.95 76,327.44 76,327.44 76,438.45 76,438.45
51 Vibratory Roller 5-8 T Unit/Jam 183,659 394,000 184,155.43 395,066.03 184,409.30 395,610.66 184,414.44 395,621.67 184,170.87 395,099.16 183,907.80 394,534.79 183,867.99 394,449.39 184,083.84 394,912.44 184,351.56 395,486.78
52 Water Pump 70-100 MM Unit/Jam 57,337 57,337 57,492.43 57,492.43 57,571.68 57,571.68 57,573.29 57,573.29 57,497.25 57,497.25 57,415.12 57,415.12 57,402.69 57,402.69 57,470.08 57,470.08 57,553.66 57,553.66
53 Water Tanker 3000-4500 L Unit/Jam 207,848 207,848 208,410.05 208,410.05 208,697.36 208,697.36 208,703.17 208,703.17 208,427.52 208,427.52 208,129.80 208,129.80 208,084.75 208,084.75 208,329.02 208,329.02 208,632.00 208,632.00
54 Welding Set Unit/Jam 116,466 116,466 116,781.49 116,781.49 116,942.48 116,942.48 116,945.74 116,945.74 116,791.28 116,791.28 116,624.46 116,624.46 116,599.21 116,599.21 116,736.09 116,736.09 116,905.86 116,905.86
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 202,472 323,000 203,020.13 323,873.93 203,300.01 324,320.41 203,305.67 324,329.44 203,037.16 323,901.09 202,747.13 323,438.42 202,703.24 323,368.40 202,941.20 323,748.02 203,236.35 324,218.86
HARGA SATUAN DASAR BAHAN KABUPATEN TRENGGALEK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
2 Agregat Pecah Mesin 20-30 mm M3 269,000 269,000 269,727.82 269,727.82 270,099.66 270,099.66 270,107.18 270,107.18 269,750.44 269,750.44 269,365.12 269,365.12 269,306.81 269,306.81 269,622.96 269,622.96 270,015.08 270,015.08
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 308,000 308,000 308,833.34 308,833.34 309,259.10 309,259.10 309,267.70 309,267.70 308,859.24 308,859.24 308,418.06 308,418.06 308,351.30 308,351.30 308,713.28 308,713.28 309,162.25 309,162.25
4 Bahan Agr. Base Kelas A M3 296,000 296,000 296,800.87 296,800.87 297,210.04 297,210.04 297,218.31 297,218.31 296,825.76 296,825.76 296,401.77 296,401.77 296,337.61 296,337.61 296,685.49 296,685.49 297,116.97 297,116.97
5 Bahan Agr. Base Kelas B M3 278,000 278,000 278,752.17 278,752.17 279,136.46 279,136.46 279,144.23 279,144.23 278,775.55 278,775.55 278,377.34 278,377.34 278,317.08 278,317.08 278,643.80 278,643.80 279,049.05 279,049.05
6 Bahan Agr. Base Kelas C M3 255,000 255,000 255,689.94 255,689.94 256,042.43 256,042.43 256,049.56 256,049.56 255,711.38 255,711.38 255,346.12 255,346.12 255,290.85 255,290.85 255,590.54 255,590.54 255,962.25 255,962.25
7 Bahan Agr. Base Kelas C2 M3 233,000 233,000 233,630.42 233,630.42 233,952.50 233,952.50 233,959.01 233,959.01 233,650.01 233,650.01 233,316.26 233,316.26 233,265.75 233,265.75 233,539.59 233,539.59 233,879.24 233,879.24
8 Bahan Agr. Base Kelas S M3 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
9 Bahan Pilihan M3 188,000 188,000 188,508.66 188,508.66 188,768.54 188,768.54 188,773.79 188,773.79 188,524.47 188,524.47 188,255.18 188,255.18 188,214.43 188,214.43 188,435.38 188,435.38 188,709.43 188,709.43
10 Bahan Tanah Timbunan M3 108,000 108,000 108,292.21 108,292.21 108,441.50 108,441.50 108,444.52 108,444.52 108,301.29 108,301.29 108,146.59 108,146.59 108,123.18 108,123.18 108,250.11 108,250.11 108,407.54 108,407.54
11 Batu Belah/Kerakal M3 304,000 304,000 304,822.52 304,822.52 305,242.74 305,242.74 305,251.24 305,251.24 304,848.08 304,848.08 304,412.63 304,412.63 304,346.73 304,346.73 304,704.02 304,704.02 305,147.16 305,147.16
12 Batu Kali M3 335,000 335,000 335,906.39 335,906.39 336,369.47 336,369.47 336,378.83 336,378.83 335,934.56 335,934.56 335,454.71 335,454.71 335,382.09 335,382.09 335,775.81 335,775.81 336,264.14 336,264.14
13 Chipping M3 199,000 199,000 199,538.43 199,538.43 199,813.51 199,813.51 199,819.07 199,819.07 199,555.16 199,555.16 199,270.11 199,270.11 199,226.97 199,226.97 199,460.85 199,460.85 199,750.94 199,750.94
14 Chipping (kg) Kg 248 248 248.67 248.67 249.01 249.01 249.02 249.02 248.69 248.69 248.34 248.34 248.28 248.28 248.57 248.57 248.94 248.94
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 358,000 358,000 358,968.62 358,968.62 359,463.49 359,463.49 359,473.50 359,473.50 358,998.73 358,998.73 358,485.93 358,485.93 358,408.32 358,408.32 358,829.07 358,829.07 359,350.93 359,350.93
18 Kapur M3 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
19 Pasir Beton (Kasar) M3 426,000 426,000 427,152.61 427,152.61 427,741.48 427,741.48 427,753.38 427,753.38 427,188.43 427,188.43 426,578.23 426,578.23 426,485.88 426,485.88 426,986.55 426,986.55 427,607.53 427,607.53
20 Pasir Halus (untuk HRS) M3 269,000 269,000 269,727.82 269,727.82 270,099.66 270,099.66 270,107.18 270,107.18 269,750.44 269,750.44 269,365.12 269,365.12 269,306.81 269,306.81 269,622.96 269,622.96 270,015.08 270,015.08
21 Pasir Pasang (Sedang) M3 301,000 301,000 301,814.40 301,814.40 302,230.48 302,230.48 302,238.89 302,238.89 301,839.71 301,839.71 301,408.56 301,408.56 301,343.31 301,343.31 301,697.07 301,697.07 302,135.84 302,135.84
22 Pasir Urug M3 183,000 183,000 183,495.13 183,495.13 183,748.10 183,748.10 183,753.21 183,753.21 183,510.52 183,510.52 183,248.39 183,248.39 183,208.72 183,208.72 183,423.80 183,423.80 183,690.56 183,690.56
23 Pasir Urug (ada unsur lempung) M3 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62
24 Sirtu M3 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
26 Anti Pengelupas Liter 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
27 Arbocell Kg 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
40 Beton B-0 M3 528,578 528,578 530,008.30 530,008.30 530,738.97 530,738.97 530,753.74 530,753.74 530,052.75 530,052.75 529,295.62 529,295.62 529,181.04 529,181.04 529,802.26 529,802.26 530,572.77 530,572.77
41 Beton K-125 (fc' 10 MPa) M3 582,000 582,000 583,574.69 583,574.69 584,379.20 584,379.20 584,395.47 584,395.47 583,623.63 583,623.63 582,789.97 582,789.97 582,663.81 582,663.81 583,347.82 583,347.82 584,196.20 584,196.20
42 Beton K-175 (fc' 15 MPa) M3 598,000 598,000 599,617.98 599,617.98 600,444.61 600,444.61 600,461.32 600,461.32 599,668.26 599,668.26 598,811.69 598,811.69 598,682.06 598,682.06 599,384.87 599,384.87 600,256.58 600,256.58
43 Beton K-250 (fc' 20 MPa) M3 658,483 658,483 660,264.58 660,264.58 661,174.82 661,174.82 661,193.22 661,193.22 660,319.95 660,319.95 659,376.74 659,376.74 659,234.00 659,234.00 660,007.90 660,007.90 660,967.77 660,967.77
44 Beton K-300 (fc' 25 MPa) M3 685,360 685,360 687,214.16 687,214.16 688,161.54 688,161.54 688,180.70 688,180.70 687,271.79 687,271.79 686,290.08 686,290.08 686,141.51 686,141.51 686,946.99 686,946.99 687,946.05 687,946.05
45 Beton K-350 (fc' 30 MPa) M3 712,237 712,237 714,163.73 714,163.73 715,148.27 715,148.27 715,168.18 715,168.18 714,223.62 714,223.62 713,203.41 713,203.41 713,049.02 713,049.02 713,886.09 713,886.09 714,924.33 714,924.33
46 Beton K-400 (fc' 35 MPa) M3 739,114 739,114 741,113.31 741,113.31 742,135.00 742,135.00 742,155.66 742,155.66 741,175.46 741,175.46 740,116.75 740,116.75 739,956.53 739,956.53 740,825.19 740,825.19 741,902.60 741,902.60
47 Beton K-450 (fc' 40 MPa) M3 774,949 774,949 777,046.07 777,046.07 778,117.30 778,117.30 778,138.96 778,138.96 777,111.24 777,111.24 776,001.20 776,001.20 775,833.22 775,833.22 776,743.99 776,743.99 777,873.64 777,873.64
48 Beton K-500 (fc' 45 MPa) M3 806,306 806,306 808,487.24 808,487.24 809,601.82 809,601.82 809,624.35 809,624.35 808,555.04 808,555.04 807,400.09 807,400.09 807,225.31 807,225.31 808,172.94 808,172.94 809,348.29 809,348.29
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 58,000 58,000 58,156.93 58,156.93 58,237.10 58,237.10 58,238.72 58,238.72 58,161.80 58,161.80 58,078.73 58,078.73 58,066.15 58,066.15 58,134.32 58,134.32 58,218.87 58,218.87
51 Cat Anti Karat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
52 Cat Marka (Non Thermoplas) Kg 55,000 55,000 55,148.81 55,148.81 55,224.84 55,224.84 55,226.38 55,226.38 55,153.44 55,153.44 55,074.65 55,074.65 55,062.73 55,062.73 55,127.37 55,127.37 55,207.55 55,207.55
53 Cat Marka (Thermoplastic) Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
54 Cerucuk Diameter 10-15 cm M' 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,169,000 1,169,000 1,172,162.91 1,172,162.91 1,173,778.84 1,173,778.84 1,173,811.51 1,173,811.51 1,172,261.20 1,172,261.20 1,170,586.73 1,170,586.73 1,170,333.33 1,170,333.33 1,171,707.22 1,171,707.22 1,173,411.28 1,173,411.28
57 Curing Compound Liter 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 546,000 546,000 547,477.29 547,477.29 548,232.03 548,232.03 548,247.29 548,247.29 547,523.20 547,523.20 546,741.11 546,741.11 546,622.75 546,622.75 547,264.45 547,264.45 548,060.36 548,060.36
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 636,000 636,000 637,720.80 637,720.80 638,599.95 638,599.95 638,617.73 638,617.73 637,774.27 637,774.27 636,863.27 636,863.27 636,725.40 636,725.40 637,472.87 637,472.87 638,399.98 638,399.98
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 806,000 806,000 808,180.76 808,180.76 809,294.91 809,294.91 809,317.43 809,317.43 808,248.53 808,248.53 807,094.02 807,094.02 806,919.30 806,919.30 807,866.57 807,866.57 809,041.48 809,041.48
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
64 Oxygen (Isi 6 M3) Botol 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
65 Polytene 125 Mikron Kg 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
66 Sand Sheet Ton 1,236,000 1,236,000 1,239,344.19 1,239,344.19 1,241,052.73 1,241,052.73 1,241,087.28 1,241,087.28 1,239,448.12 1,239,448.12 1,237,677.67 1,237,677.67 1,237,409.75 1,237,409.75 1,238,862.38 1,238,862.38 1,240,664.10 1,240,664.10
67 Seal Coat M2 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
68 Seal Guard Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
69 Semen/PC (50 kg) Zak 64,000 64,000 64,173.16 64,173.16 64,261.63 64,261.63 64,263.42 64,263.42 64,178.54 64,178.54 64,086.87 64,086.87 64,073.00 64,073.00 64,148.21 64,148.21 64,241.51 64,241.51
70 Semen/PC (kg) Kg 1,000 1,000 1,002.71 1,002.71 1,004.09 1,004.09 1,004.12 1,004.12 1,002.79 1,002.79 1,001.36 1,001.36 1,001.14 1,001.14 1,002.32 1,002.32 1,003.77 1,003.77
71 Slurry Seal Ton 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
77 Baja Tulangan (Polos) U25 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
84 Baja Tulangan (Ulir) D36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,647,000 11,647,000 11,678,512.74 11,678,512.74 11,694,612.61 11,694,612.61 11,694,938.16 11,694,938.16 11,679,492.09 11,679,492.09 11,662,808.95 11,662,808.95 11,660,284.25 11,660,284.25 11,673,972.58 11,673,972.58 11,690,950.50 11,690,950.50
87 Box Culvert Type DUB 200×200 M' 12,363,000 12,363,000 12,396,449.99 12,396,449.99 12,413,539.59 12,413,539.59 12,413,885.16 12,413,885.16 12,397,489.54 12,397,489.54 12,379,780.80 12,379,780.80 12,377,100.90 12,377,100.90 12,391,630.72 12,391,630.72 12,409,652.36 12,409,652.36
88 Box Culvert Type uk 300×200 M' 13,349,000 13,349,000 13,385,117.77 13,385,117.77 13,403,570.33 13,403,570.33 13,403,943.46 13,403,943.46 13,386,240.22 13,386,240.22 13,367,119.14 13,367,119.14 13,364,225.50 13,364,225.50 13,379,914.14 13,379,914.14 13,399,373.08 13,399,373.08
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 174,000 174,000 174,470.78 174,470.78 174,711.31 174,711.31 174,716.17 174,716.17 174,485.41 174,485.41 174,236.18 174,236.18 174,198.46 174,198.46 174,402.96 174,402.96 174,656.60 174,656.60
91 Ducting (Strand Prestress) M' 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 1,950,000 1,950,000 1,955,276.02 1,955,276.02 1,957,971.54 1,957,971.54 1,958,026.05 1,958,026.05 1,955,439.99 1,955,439.99 1,952,646.81 1,952,646.81 1,952,224.12 1,952,224.12 1,954,515.89 1,954,515.89 1,957,358.42 1,957,358.42
94 Expansion Join Tipe Rubber M' 1,411,000 1,411,000 1,414,817.68 1,414,817.68 1,416,768.13 1,416,768.13 1,416,807.57 1,416,807.57 1,414,936.32 1,414,936.32 1,412,915.21 1,412,915.21 1,412,609.35 1,412,609.35 1,414,267.65 1,414,267.65 1,416,324.48 1,416,324.48
95 Expansion Join Tipe Torma M' 1,619,000 1,619,000 1,623,380.45 1,623,380.45 1,625,618.43 1,625,618.43 1,625,663.68 1,625,663.68 1,623,516.59 1,623,516.59 1,621,197.53 1,621,197.53 1,620,846.59 1,620,846.59 1,622,749.34 1,622,749.34 1,625,109.37 1,625,109.37
96 Expansion Tipe Joint Asphaltic Plug M' 1,920,000 1,920,000 1,925,194.85 1,925,194.85 1,927,848.91 1,927,848.91 1,927,902.57 1,927,902.57 1,925,356.30 1,925,356.30 1,922,606.09 1,922,606.09 1,922,189.90 1,922,189.90 1,924,446.41 1,924,446.41 1,927,245.21 1,927,245.21
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
99 Glass Bead Kg 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
100 Joint Sealent Kg 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
101 Joint Socket Pile 16×16×16 Set 82,000 82,000 82,221.86 82,221.86 82,335.21 82,335.21 82,337.51 82,337.51 82,228.76 82,228.76 82,111.30 82,111.30 82,093.53 82,093.53 82,189.90 82,189.90 82,309.43 82,309.43
102 Joint Socket Pile 35×35 Set 701,000 701,000 702,896.66 702,896.66 703,865.67 703,865.67 703,885.26 703,885.26 702,955.61 702,955.61 701,951.50 701,951.50 701,799.54 701,799.54 702,623.40 702,623.40 703,645.26 703,645.26
103 Kawat Beton Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
104 Kawat Bronjong Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
105 Kawat Las Dos 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
106 Kayu Acuan (Kelas III/Meranti) M3 3,852,000 3,852,000 3,862,422.18 3,862,422.18 3,867,746.87 3,867,746.87 3,867,854.54 3,867,854.54 3,862,746.07 3,862,746.07 3,857,228.48 3,857,228.48 3,856,393.49 3,856,393.49 3,860,920.61 3,860,920.61 3,866,535.70 3,866,535.70
107 Kayu Perancah (Gelam) M3 2,482,000 2,482,000 2,488,715.43 2,488,715.43 2,492,146.35 2,492,146.35 2,492,215.72 2,492,215.72 2,488,924.13 2,488,924.13 2,485,368.92 2,485,368.92 2,484,830.90 2,484,830.90 2,487,747.91 2,487,747.91 2,491,365.94 2,491,365.94
108 Kerb Pracetak Type 1 (Peninggi) Buah 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
110 Marmer Nama Jembatan Buah 538,000 538,000 539,455.64 539,455.64 540,199.33 540,199.33 540,214.37 540,214.37 539,500.88 539,500.88 538,730.25 538,730.25 538,613.63 538,613.63 539,245.92 539,245.92 540,030.17 540,030.17
111 Mata Kucing Buah 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
112 Matras Concrete (Tebal=10 cm) M2 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
113 Mini Pile 16×16×16 M' 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
114 Mini Timber Pile Buah 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
115 Multipleks 12 mm Lbr 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
116 Paku Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
117 Paving Block (Model Bata 8 cm) M2 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 59,558,000 59,558,000 59,719,143.30 59,719,143.30 59,801,471.42 59,801,471.42 59,803,136.15 59,803,136.15 59,724,151.26 59,724,151.26 59,638,840.50 59,638,840.50 59,625,930.21 59,625,930.21 59,695,926.76 59,695,926.76 59,782,744.92 59,782,744.92
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 84,373,000 84,373,000 84,601,284.09 84,601,284.09 84,717,914.44 84,717,914.44 84,720,272.78 84,720,272.78 84,608,378.63 84,608,378.63 84,487,522.91 84,487,522.91 84,469,233.52 84,469,233.52 84,568,394.32 84,568,394.32 84,691,385.50 84,691,385.50
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 161,261,000 161,261,000 161,697,316.36 161,697,316.36 161,920,230.41 161,920,230.41 161,924,737.87 161,924,737.87 161,710,876.06 161,710,876.06 161,479,886.12 161,479,886.12 161,444,929.85 161,444,929.85 161,634,454.58 161,634,454.58 161,869,525.99 161,869,525.99
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 211,468,000 211,468,000 212,040,159.09 212,040,159.09 212,332,475.21 212,332,475.21 212,338,386.02 212,338,386.02 212,057,940.47 212,057,940.47 211,755,034.13 211,755,034.13 211,709,194.57 211,709,194.57 211,957,725.93 211,957,725.93 212,265,984.48 212,265,984.48
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 269,566,000 269,566,000 270,295,352.14 270,295,352.14 270,667,978.19 270,667,978.19 270,675,512.92 270,675,512.92 270,318,018.71 270,318,018.71 269,931,892.91 269,931,892.91 269,873,459.55 269,873,459.55 270,190,271.57 270,190,271.57 270,583,220.02 270,583,220.02
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 325,231,000 325,231,000 326,110,962.33 326,110,962.33 326,560,535.14 326,560,535.14 326,569,625.77 326,569,625.77 326,138,309.52 326,138,309.52 325,672,449.28 325,672,449.28 325,601,949.51 325,601,949.51 325,984,182.77 325,984,182.77 326,458,274.53 326,458,274.53
124 Pelat Rambu (Eng. Grade) Buah 188,000 188,000 188,508.66 188,508.66 188,768.54 188,768.54 188,773.79 188,773.79 188,524.47 188,524.47 188,255.18 188,255.18 188,214.43 188,214.43 188,435.38 188,435.38 188,709.43 188,709.43
125 Pelat Rambu (High L Grade) Buah 219,000 219,000 219,592.54 219,592.54 219,895.27 219,895.27 219,901.39 219,901.39 219,610.95 219,610.95 219,297.26 219,297.26 219,249.79 219,249.79 219,507.17 219,507.17 219,826.41 219,826.41
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
128 Pipa Drainase Baja Dia 3" M' 247,000 247,000 247,668.30 247,668.30 248,009.73 248,009.73 248,016.63 248,016.63 247,689.07 247,689.07 247,335.26 247,335.26 247,281.72 247,281.72 247,572.01 247,572.01 247,932.07 247,932.07
129 Pipa Galvanis Dia 1,5" M' 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
130 Pipa Galvanis Dia 2" M' 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
131 Pipa Galvanis Dia 3" M' 216,000 216,000 216,584.42 216,584.42 216,883.00 216,883.00 216,889.04 216,889.04 216,602.58 216,602.58 216,293.19 216,293.19 216,246.36 216,246.36 216,500.22 216,500.22 216,815.09 216,815.09
132 Pipa Porus M' 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
133 Pipa PVC Dia 4" M' 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
134 Plastik Filter M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
135 Rel Pengaman M' 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,840,000 1,840,000 1,844,978.40 1,844,978.40 1,847,521.87 1,847,521.87 1,847,573.30 1,847,573.30 1,845,133.12 1,845,133.12 1,842,497.51 1,842,497.51 1,842,098.65 1,842,098.65 1,844,261.14 1,844,261.14 1,846,943.33 1,846,943.33
137 Strip Bearing Buah 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
138 Tiang Pancang Baja Diameter 400 M' 652,000 652,000 653,764.09 653,764.09 654,665.36 654,665.36 654,683.58 654,683.58 653,818.91 653,818.91 652,884.99 652,884.99 652,743.65 652,743.65 653,509.93 653,509.93 654,460.35 654,460.35
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 797,000 797,000 799,156.41 799,156.41 800,258.11 800,258.11 800,280.39 800,280.39 799,223.42 799,223.42 798,081.80 798,081.80 797,909.04 797,909.04 798,845.72 798,845.72 800,007.52 800,007.52
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,666,000 1,666,000 1,670,507.62 1,670,507.62 1,672,810.56 1,672,810.56 1,672,857.13 1,672,857.13 1,670,647.70 1,670,647.70 1,668,261.33 1,668,261.33 1,667,900.19 1,667,900.19 1,669,858.19 1,669,858.19 1,672,286.73 1,672,286.73
HARGA SATUAN DASAR UPAH KABUPATEN TRENGGALEK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 108,449.84 108,449.84 108,340.23 108,340.23 108,182.63 108,182.63 108,123.17 108,123.17 108,214.75 108,214.75 108,370.09 108,370.09 108,444.84 108,444.84 108,279.52 108,279.52
2 Tukang OH 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 121,313.17
3 Mandor OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76
4 Operator OH 288,195.40 288,195.40 287,904.13 287,904.13 287,485.32 287,485.32 287,327.31 287,327.31 287,570.68 287,570.68 287,983.49 287,983.49 288,182.13 288,182.13 287,742.81 287,742.81
5 Pembantu Operator OH 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 179,463.28
6 Sopir OH 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 134,346.82
7 Pembantu Sopir OH 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 116,300.23
8 Mekanik OH 161,670.59 161,670.59 161,507.20 161,507.20 161,272.25 161,272.25 161,183.61 161,183.61 161,320.14 161,320.14 161,551.72 161,551.72 161,663.15 161,663.15 161,416.70 161,416.70
9 Pembantu Mekanik OH 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 116,300.23
10 Kepala Tukang OH 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 134,346.82
11 Pemasak Aspal OH 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 134,346.82

HARGA SATUAN DASAR ALAT KABUPATEN TRENGGALEK TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 423,724.18 423,757.69 423,295.94 423,329.42 422,680.19 422,713.61 422,447.86 422,481.27 422,805.68 422,839.12 423,412.63 423,446.11 423,704.68 423,738.19 423,058.75 810,888.98
2 Asphalt Distribution Unit/Jam 260,891.75 260,891.75 260,628.08 260,628.08 260,248.95 260,248.95 260,105.90 260,105.90 260,326.22 260,326.22 260,699.92 260,699.92 260,879.74 260,879.74 260,482.03 499,252.87
3 Asphalt Finisher Unit/Jam 191,620.49 191,795.54 191,426.83 191,601.70 191,148.36 191,322.99 191,043.30 191,217.83 191,205.12 191,379.79 191,479.59 191,654.52 191,611.67 191,786.71 191,319.56 366,867.40
4 Asphalt Liquid Mixer Unit/Jam 68,371.63 68,371.63 68,302.53 68,302.53 68,203.17 68,203.17 68,165.68 68,165.68 68,223.42 68,223.42 68,321.36 68,321.36 68,368.48 68,368.48 68,264.26 130,838.68
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 91,761.93 92,383.19 91,669.19 92,289.83 91,535.84 92,155.57 91,485.52 92,104.92 91,563.01 92,182.94 91,694.45 92,315.27 91,757.70 92,378.94 91,617.82 176,219.58
6 Asphalt Mixing Plant Unit/Jam 1,025,574.46 5,260,656.29 1,024,537.95 5,255,339.57 1,023,047.58 5,247,694.75 1,022,485.27 5,244,810.41 1,023,351.33 5,249,252.83 1,024,820.37 5,256,788.21 1,025,527.25 5,260,414.13 1,023,963.86 6,191,011.17
7 Asphalt Sprayer Unit/Jam 84,564.91 84,564.91 84,479.45 84,479.45 84,356.55 84,356.55 84,310.19 84,310.19 84,381.60 84,381.60 84,502.73 84,502.73 84,561.02 84,561.02 84,432.11 161,826.79
8 Asphalt Tanker Unit/Jam 395,835.76 395,835.76 395,435.70 395,435.70 394,860.47 394,860.47 394,643.44 394,643.44 394,977.71 394,977.71 395,544.70 395,544.70 395,817.53 395,817.53 395,214.12 757,487.11
9 Blending Equipment Unit/Jam 128,646.62 128,646.62 128,516.60 128,516.60 128,329.65 128,329.65 128,259.12 128,259.12 128,367.75 128,367.75 128,552.03 128,552.03 128,640.70 128,640.70 128,444.59 246,183.31
10 Bore Pile Machine Unit/Jam 354,452.93 354,470.30 354,094.70 354,112.05 353,579.60 353,596.93 353,385.26 353,402.58 353,684.58 353,701.92 354,192.30 354,209.66 354,436.61 354,453.98 353,896.28 678,312.62
11 Bore Pile Machine Dia 60 Unit/Jam 232,103.69 232,103.69 231,869.12 231,869.12 231,531.82 231,531.82 231,404.56 231,404.56 231,600.56 231,600.56 231,933.03 231,933.03 232,093.01 232,093.01 231,739.19 444,162.90
12 Bore Pile Machine Dia 80 Unit/Jam 917,619.25 917,619.25 916,691.85 916,691.85 915,358.36 915,358.36 914,855.25 914,855.25 915,630.14 915,630.14 916,944.54 916,944.54 917,577.01 917,577.01 916,178.19 1,755,992.85
13 Bulldozer 100-150 HP Unit/Jam 359,850.69 359,850.69 359,487.00 359,487.00 358,964.06 358,964.06 358,766.76 358,766.76 359,070.64 359,070.64 359,586.09 359,586.09 359,834.12 359,834.12 359,285.57 688,624.65
14 Cement Tanker Unit/Jam 334,661.14 334,661.14 334,322.91 334,322.91 333,836.58 333,836.58 333,653.09 333,653.09 333,935.70 333,935.70 334,415.07 334,415.07 334,645.73 334,645.73 334,135.58 640,420.92
15 Cold Milling Unit/Jam 522,683.12 522,683.12 522,154.87 522,154.87 521,395.30 521,395.30 521,108.72 521,108.72 521,550.11 521,550.11 522,298.80 522,298.80 522,659.06 522,659.06 521,862.28 1,000,227.30
16 Cold Recycler Unit/Jam 4,401,873.53 4,401,873.53 4,397,424.74 4,397,424.74 4,391,027.91 4,391,027.91 4,388,614.43 4,388,614.43 4,392,331.64 4,392,331.64 4,398,636.89 4,398,636.89 4,401,670.90 4,401,670.90 4,394,960.68 8,423,601.00
17 Compressor 4000-6500 L\M Unit/Jam 134,044.38 134,044.38 133,908.91 133,908.91 133,714.11 133,714.11 133,640.62 133,640.62 133,753.81 133,753.81 133,945.82 133,945.82 134,038.21 134,038.21 133,833.87 256,512.68
18 Concrete Breaker Unit/Jam 488,497.31 930,861.09 488,003.60 929,920.31 487,293.72 928,567.58 487,025.88 928,057.20 487,438.40 928,843.28 488,138.12 930,176.65 488,474.82 930,818.25 487,730.15 1,376,477.04
19 Concrete Mixer (350) Unit/Jam 90,862.30 90,862.30 90,770.47 90,770.47 90,638.43 90,638.43 90,588.61 90,588.61 90,665.34 90,665.34 90,795.49 90,795.49 90,858.12 90,858.12 90,719.61 173,877.72
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 103,457.07 103,457.07 103,352.51 103,352.51 103,202.17 103,202.17 103,145.44 103,145.44 103,232.81 103,232.81 103,381.00 103,381.00 103,452.31 103,452.31 103,294.60 197,979.59
21 Concrete Pan Mixer Unit/Jam 275,285.78 589,444.94 275,007.56 588,849.22 274,607.51 587,992.63 274,456.57 587,669.45 274,689.04 588,167.21 275,083.36 589,011.53 275,273.10 589,417.81 274,853.46 840,463.66
22 Concrete Pump Unit/Jam 209,613.03 224,932.99 209,401.18 224,705.66 209,096.57 224,378.79 208,981.64 224,255.46 209,158.65 224,445.41 209,458.90 224,767.60 209,603.38 224,922.64 209,283.84 416,419.77
23 Concrete Vibrator Unit/Jam 78,267.52 78,267.52 78,188.42 78,188.42 78,074.68 78,074.68 78,031.77 78,031.77 78,097.86 78,097.86 78,209.98 78,209.98 78,263.92 78,263.92 78,144.61 149,775.86
24 Crane 10-15 Ton Unit/Jam 280,683.54 280,683.54 280,399.86 280,399.86 279,991.97 279,991.97 279,838.08 279,838.08 280,075.10 280,075.10 280,477.15 280,477.15 280,670.62 280,670.62 280,242.74 537,127.23
25 Crane On Track 35 Ton Unit/Jam 233,003.32 442,836.83 232,767.83 442,389.27 232,429.23 441,745.74 232,301.48 441,502.94 232,498.24 441,876.90 232,832.00 442,511.22 232,992.59 442,816.45 232,637.40 655,388.44
26 Crane On Track 75-100 Ton Unit/Jam 366,148.07 555,303.33 365,778.02 554,742.11 365,245.93 553,935.14 365,045.18 553,630.67 365,354.38 554,099.60 365,878.85 554,895.02 366,131.22 555,277.77 365,573.06 889,533.78
27 Dump Truck 10 Ton Unit/Jam 346,356.29 372,545.27 346,006.24 372,168.76 345,502.91 371,627.37 345,313.01 371,423.11 345,605.49 371,737.71 346,101.62 372,271.34 346,340.34 372,528.12 345,812.36 688,949.08
28 Dump Truck 3-4 M3 Unit/Jam 188,921.61 191,795.54 188,730.68 191,601.70 188,456.13 191,322.99 188,352.55 191,217.83 188,512.09 191,379.79 188,782.70 191,654.52 188,912.91 191,786.71 188,624.92 364,397.36
29 Excavator 80-140 HP Unit/Jam 273,486.52 434,803.51 273,210.12 434,364.07 272,812.69 433,732.21 272,662.74 433,493.82 272,893.69 433,860.99 273,285.43 434,483.81 273,473.93 434,783.50 273,057.03 684,418.38
30 Flat Bed Truck 3-4 M3 Unit/Jam 331,962.26 443,841.00 331,626.76 443,392.43 331,144.35 442,747.43 330,962.34 442,504.08 331,242.67 442,878.89 331,718.17 443,514.65 331,946.98 443,820.57 331,440.93 746,959.28
31 Fulvi Mixer Unit/Jam 831,255.09 1,298,385.54 830,414.97 1,297,073.32 829,206.99 1,295,186.49 828,751.22 1,294,474.61 829,453.19 1,295,571.05 830,643.88 1,297,430.86 831,216.82 1,298,325.77 829,949.66 2,057,119.79
32 Generator Set Unit/Jam 369,746.58 392,628.57 369,372.89 392,231.76 368,835.58 391,661.19 368,632.85 391,445.92 368,945.09 391,777.48 369,474.71 392,339.88 369,729.56 392,610.50 369,165.92 730,407.88
33 Hot Recycler Unit/Jam 2,715,973.06 7,964,033.81 2,713,228.14 7,955,984.90 2,709,281.27 7,944,411.52 2,707,792.14 7,940,044.96 2,710,085.68 7,946,770.27 2,713,976.04 7,958,177.97 2,715,848.04 7,963,667.21 2,711,707.80 10,437,213.55
34 Jack Hammer Unit/Jam 51,278.72 51,278.72 51,226.90 51,226.90 51,152.38 51,152.38 51,124.26 51,124.26 51,167.57 51,167.57 51,241.02 51,241.02 51,276.36 51,276.36 51,198.19 98,129.01
35 Launching Gantry Unit/Jam 65,258,022.44 65,258,684.82 65,192,068.89 65,192,730.61 65,097,235.56 65,097,896.31 65,061,455.58 65,062,115.97 65,116,563.44 65,117,224.39 65,210,039.16 65,210,701.05 65,255,018.45 65,255,680.81 65,155,539.07 124,881,019.64
36 Motor Grader > 100 HP Unit/Jam 256,393.61 430,786.85 256,134.49 430,351.47 255,761.90 429,725.45 255,621.32 429,489.26 255,837.83 429,853.04 256,205.09 430,470.10 256,381.81 430,767.02 255,990.97 664,764.42
37 Pedestrian Roller Unit/Jam 84,564.91 84,564.91 84,479.45 84,479.45 84,356.55 84,356.55 84,310.19 84,310.19 84,381.60 84,381.60 84,502.73 84,502.73 84,561.02 84,561.02 84,432.11 161,826.79
38 Pile Driver + Hammer Unit/Jam 96,260.06 281,166.24 96,162.77 280,882.08 96,022.89 280,473.49 95,970.11 280,319.33 96,051.40 280,556.76 96,189.28 280,959.50 96,255.63 281,153.30 96,108.89 368,822.89
39 Rock Drill Breaker Unit/Jam 93,561.18 304,262.04 93,466.62 303,954.54 93,330.66 303,512.38 93,279.36 303,345.56 93,358.37 303,602.50 93,492.38 304,038.32 93,556.87 304,248.03 93,414.25 389,412.38
40 Split Form Paver Unit/Jam 197,917.88 197,917.88 197,717.85 197,717.85 197,430.24 197,430.24 197,321.72 197,321.72 197,488.85 197,488.85 197,772.35 197,772.35 197,908.77 197,908.77 197,607.06 378,743.56
41 Stone Crusher Unit/Jam 529,880.14 660,740.67 529,344.61 660,072.89 528,574.58 659,112.69 528,284.06 658,750.42 528,731.52 659,308.39 529,490.52 660,254.84 529,855.74 660,710.25 529,048.00 1,144,654.82
42 Tamper Unit/Jam 79,167.15 79,329.05 79,087.14 79,248.87 78,972.09 79,133.59 78,928.69 79,090.10 78,995.54 79,157.09 79,108.94 79,270.72 79,163.51 79,325.40 79,042.82 151,659.06
43 Tandem Roller 6-8 T Unit/Jam 382,341.35 445,849.33 381,954.94 445,398.73 381,399.32 444,750.81 381,189.69 444,506.36 381,512.56 444,882.86 382,060.22 445,521.50 382,323.75 445,828.80 381,740.91 795,071.93
44 Three Wheel Roller 6-8 T Unit/Jam 126,847.37 159,662.26 126,719.17 159,500.90 126,534.83 159,268.87 126,465.28 159,181.33 126,572.40 159,316.16 126,754.10 159,544.86 126,841.53 159,654.91 126,648.16 275,503.55
45 Tire Roller 8-10 T Unit/Jam 226,705.93 409,699.38 226,476.81 409,285.32 226,147.36 408,689.94 226,023.06 408,465.31 226,214.51 408,811.28 226,539.24 409,398.14 226,695.50 409,680.52 226,349.91 616,539.60
46 Track Loader 75-100 HP Unit/Jam 212,311.91 280,162.08 212,097.33 279,878.93 211,788.80 279,471.80 211,672.39 279,318.19 211,851.68 279,554.77 212,155.80 279,956.08 212,302.13 280,149.18 211,978.48 474,032.16
47 Trailer 20 Ton Unit/Jam 342,757.78 473,965.95 342,411.37 473,486.93 341,913.27 472,798.16 341,725.34 472,538.30 342,014.79 472,938.54 342,505.75 473,617.45 342,742.00 473,944.13 342,219.50 786,917.10
48 Trailler 15 Ton Unit/Jam 296,876.82 451,874.32 296,576.78 451,417.63 296,145.35 450,760.96 295,982.58 450,513.21 296,233.28 450,894.80 296,658.53 451,542.06 296,863.15 451,853.52 296,410.59 722,869.42
49 Truck Mixer (agitator) Unit/Jam 373,345.09 548,274.17 372,967.76 547,720.05 372,425.22 546,923.30 372,220.52 546,622.69 372,535.79 547,085.69 373,070.57 547,871.03 373,327.90 548,248.93 372,758.77 889,102.44
50 Vibrating Rammer Unit/Jam 76,468.27 76,468.27 76,390.99 76,390.99 76,279.86 76,279.86 76,237.94 76,237.94 76,302.51 76,302.51 76,412.04 76,412.04 76,464.75 76,464.75 76,348.18 146,332.74
51 Vibratory Roller 5-8 T Unit/Jam 184,423.48 395,641.07 184,237.09 395,241.21 183,969.08 394,666.26 183,867.97 394,449.34 184,023.70 394,783.44 184,287.87 395,350.16 184,414.99 395,622.86 184,133.85 563,806.02
52 Water Pump 70-100 MM Unit/Jam 57,576.11 57,576.11 57,517.92 57,517.92 57,434.25 57,434.25 57,402.68 57,402.68 57,451.30 57,451.30 57,533.78 57,533.78 57,573.46 57,573.46 57,485.69 110,179.94
53 Water Tanker 3000-4500 L Unit/Jam 208,713.40 208,713.40 208,502.46 208,502.46 208,199.16 208,199.16 208,084.72 208,084.72 208,260.97 208,260.97 208,559.93 208,559.93 208,703.79 208,703.79 208,385.63 399,402.30
54 Welding Set Unit/Jam 116,951.47 116,951.47 116,833.28 116,833.28 116,663.32 116,663.32 116,599.20 116,599.20 116,697.96 116,697.96 116,865.48 116,865.48 116,946.09 116,946.09 116,767.81 223,803.01
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 203,315.64 324,345.34 203,110.16 324,017.54 202,814.70 323,546.20 202,703.22 323,368.37 202,874.91 323,642.26 203,166.14 324,106.86 203,306.28 324,330.41 202,996.34 509,912.56
HARGA SATUAN DASAR BAHAN KABUPATEN TRENGGALEK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
2 Agregat Pecah Mesin 20-30 mm M3 270,120.43 270,120.43 269,847.43 269,847.43 269,454.89 269,454.89 269,306.78 269,306.78 269,534.89 269,534.89 269,921.81 269,921.81 270,107.99 270,107.99 269,696.22 516,913.24
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 309,282.87 309,282.87 308,970.29 308,970.29 308,520.84 308,520.84 308,351.26 308,351.26 308,612.44 308,612.44 309,055.46 309,055.46 309,268.63 309,268.63 308,797.16 591,856.05
4 Bahan Agr. Base Kelas A M3 297,232.88 297,232.88 296,932.48 296,932.48 296,500.54 296,500.54 296,337.58 296,337.58 296,588.58 296,588.58 297,014.33 297,014.33 297,219.20 297,219.20 296,766.10 568,796.72
5 Bahan Agr. Base Kelas B M3 279,157.91 279,157.91 278,875.78 278,875.78 278,470.10 278,470.10 278,317.05 278,317.05 278,552.78 278,552.78 278,952.65 278,952.65 279,145.06 279,145.06 278,719.51 534,207.73
6 Bahan Agr. Base Kelas C M3 256,062.11 256,062.11 255,803.32 255,803.32 255,431.21 255,431.21 255,290.82 255,290.82 255,507.05 255,507.05 255,873.83 255,873.83 256,050.33 256,050.33 255,659.98 490,010.69
7 Bahan Agr. Base Kelas C2 M3 233,970.48 233,970.48 233,734.02 233,734.02 233,394.01 233,394.01 233,265.73 233,265.73 233,463.31 233,463.31 233,798.45 233,798.45 233,959.71 233,959.71 233,603.05 447,735.26
8 Bahan Agr. Base Kelas S M3 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 363,184.39
9 Bahan Pilihan M3 188,783.05 188,783.05 188,592.25 188,592.25 188,317.91 188,317.91 188,214.41 188,214.41 188,373.83 188,373.83 188,644.24 188,644.24 188,774.36 188,774.36 188,486.58 361,262.78
10 Bahan Tanah Timbunan M3 108,449.84 108,449.84 108,340.23 108,340.23 108,182.63 108,182.63 108,123.17 108,123.17 108,214.75 108,214.75 108,370.09 108,370.09 108,444.84 108,444.84 108,279.52 207,533.94
11 Batu Belah/Kerakal M3 305,266.21 305,266.21 304,957.69 304,957.69 304,514.07 304,514.07 304,346.70 304,346.70 304,604.48 304,604.48 305,041.75 305,041.75 305,252.15 305,252.15 304,786.81 584,169.60
12 Batu Kali M3 336,395.33 336,395.33 336,055.34 336,055.34 335,566.49 335,566.49 335,382.05 335,382.05 335,666.13 335,666.13 336,147.98 336,147.98 336,379.84 336,379.84 335,867.04 643,739.53
13 Chipping M3 199,828.87 199,828.87 199,626.91 199,626.91 199,336.51 199,336.51 199,226.95 199,226.95 199,395.70 199,395.70 199,681.93 199,681.93 199,819.67 199,819.67 199,515.05 382,400.50
14 Chipping (kg) Kg 249.03 249.03 248.78 248.78 248.42 248.42 248.28 248.28 248.49 248.49 248.85 248.85 249.02 249.02 248.64 476.56
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 359,491.12 359,491.12 359,127.80 359,127.80 358,605.39 358,605.39 358,408.28 358,408.28 358,711.86 358,711.86 359,226.80 359,226.80 359,474.58 359,474.58 358,926.57 687,936.57
18 Kapur M3 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
19 Pasir Beton (Kasar) M3 427,774.35 427,774.35 427,342.02 427,342.02 426,720.38 426,720.38 426,485.83 426,485.83 426,847.07 426,847.07 427,459.82 427,459.82 427,754.66 427,754.66 427,102.56 818,606.09
20 Pasir Halus (untuk HRS) M3 270,120.43 270,120.43 269,847.43 269,847.43 269,454.89 269,454.89 269,306.78 269,306.78 269,534.89 269,534.89 269,921.81 269,921.81 270,107.99 270,107.99 269,696.22 516,913.24
21 Pasir Pasang (Sedang) M3 302,253.71 302,253.71 301,948.24 301,948.24 301,509.00 301,509.00 301,343.28 301,343.28 301,598.52 301,598.52 302,031.47 302,031.47 302,239.80 302,239.80 301,779.04 578,404.77
22 Pasir Urug M3 183,762.22 183,762.22 183,576.50 183,576.50 183,309.46 183,309.46 183,208.70 183,208.70 183,363.88 183,363.88 183,627.10 183,627.10 183,753.76 183,753.76 183,473.64 351,654.73
23 Pasir Urug (ada unsur lempung) M3 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 274,790.31
24 Sirtu M3 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
26 Anti Pengelupas Liter 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
27 Arbocell Kg 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 244,044.54
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
40 Beton B-0 M3 530,779.76 530,779.76 530,243.33 530,243.33 529,471.99 529,471.99 529,180.98 529,180.98 529,629.20 529,629.20 530,389.49 530,389.49 530,755.33 530,755.33 529,946.21 1,015,721.36
41 Beton K-125 (fc' 10 MPa) M3 584,424.12 584,424.12 583,833.46 583,833.46 582,984.18 582,984.18 582,663.75 582,663.75 583,157.27 583,157.27 583,994.40 583,994.40 584,397.22 584,397.22 583,506.32 1,118,377.34
42 Beton K-175 (fc' 15 MPa) M3 600,490.76 600,490.76 599,883.87 599,883.87 599,011.23 599,011.23 598,681.99 598,681.99 599,189.08 599,189.08 600,049.23 600,049.23 600,463.12 600,463.12 599,547.73 1,149,123.10
43 Beton K-250 (fc' 20 MPa) M3 661,225.64 661,225.64 660,557.36 660,557.36 659,596.47 659,596.47 659,233.93 659,233.93 659,792.31 659,792.31 660,739.45 660,739.45 661,195.20 661,195.20 660,187.23 1,265,347.79
44 Beton K-300 (fc' 25 MPa) M3 688,214.44 688,214.44 687,518.89 687,518.89 686,518.77 686,518.77 686,141.43 686,141.43 686,722.60 686,722.60 687,708.40 687,708.40 688,182.76 688,182.76 687,133.64 1,316,994.64
45 Beton K-350 (fc' 30 MPa) M3 715,203.24 715,203.24 714,480.41 714,480.41 713,441.08 713,441.08 713,048.94 713,048.94 713,652.90 713,652.90 714,677.36 714,677.36 715,170.32 715,170.32 714,080.06 1,368,641.49
46 Beton K-400 (fc' 35 MPa) M3 742,192.04 742,192.04 741,441.94 741,441.94 740,363.38 740,363.38 739,956.45 739,956.45 740,583.20 740,583.20 741,646.32 741,646.32 742,157.88 742,157.88 741,026.48 1,420,288.34
47 Beton K-450 (fc' 40 MPa) M3 778,177.11 778,177.11 777,390.64 777,390.64 776,259.79 776,259.79 775,833.13 775,833.13 776,490.27 776,490.27 777,604.93 777,604.93 778,141.29 778,141.29 776,955.04 1,489,150.80
48 Beton K-500 (fc' 45 MPa) M3 809,664.05 809,664.05 808,845.75 808,845.75 807,669.14 807,669.14 807,225.22 807,225.22 807,908.95 807,908.95 809,068.71 809,068.71 809,626.77 809,626.77 808,392.52 1,549,405.46
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 58,241.58 58,241.58 58,182.72 58,182.72 58,098.08 58,098.08 58,066.15 58,066.15 58,115.33 58,115.33 58,198.75 58,198.75 58,238.90 58,238.90 58,150.11 111,453.41
51 Cat Anti Karat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
52 Cat Marka (Non Thermoplas) Kg 55,229.08 55,229.08 55,173.27 55,173.27 55,093.01 55,093.01 55,062.73 55,062.73 55,109.36 55,109.36 55,188.47 55,188.47 55,226.54 55,226.54 55,142.35 105,688.58
53 Cat Marka (Thermoplastic) Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
54 Cerucuk Diameter 10-15 cm M' 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,173,869.06 1,173,869.06 1,172,682.68 1,172,682.68 1,170,976.81 1,170,976.81 1,170,333.19 1,170,333.19 1,171,324.48 1,171,324.48 1,173,005.93 1,173,005.93 1,173,815.03 1,173,815.03 1,172,025.58 2,246,362.72
57 Curing Compound Liter 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 548,274.17 548,274.17 547,720.05 547,720.05 546,923.30 546,923.30 546,622.69 546,622.69 547,085.69 547,085.69 547,871.03 547,871.03 548,248.93 548,248.93 547,413.14 1,049,199.36
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 638,649.04 638,649.04 638,003.58 638,003.58 637,075.49 637,075.49 636,725.33 636,725.33 637,264.64 637,264.64 638,179.45 638,179.45 638,619.64 638,619.64 637,646.08 1,222,144.30
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 809,357.11 809,357.11 808,539.13 808,539.13 807,362.97 807,362.97 806,919.21 806,919.21 807,602.68 807,602.68 808,762.00 808,762.00 809,319.85 809,319.85 808,086.07 1,548,818.10
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
64 Oxygen (Isi 6 M3) Botol 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 295,928.02
65 Polytene 125 Mikron Kg 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
66 Sand Sheet Ton 1,241,148.13 1,241,148.13 1,239,893.75 1,239,893.75 1,238,090.11 1,238,090.11 1,237,409.60 1,237,409.60 1,238,457.71 1,238,457.71 1,240,235.53 1,240,235.53 1,241,090.99 1,241,090.99 1,239,198.99 2,375,110.63
67 Seal Coat M2 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 190,239.44
68 Seal Guard Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
69 Semen/PC (50 kg) Zak 64,266.57 64,266.57 64,201.62 64,201.62 64,108.23 64,108.23 64,072.99 64,072.99 64,127.26 64,127.26 64,219.32 64,219.32 64,263.61 64,263.61 64,165.64 122,983.07
70 Semen/PC (kg) Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12 1,002.59 1,921.61
71 Slurry Seal Ton 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
77 Baja Tulangan (Polos) U25 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
84 Baja Tulangan (Ulir) D36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,695,511.51 11,695,511.51 11,683,691.35 11,683,691.35 11,666,695.36 11,666,695.36 11,660,282.89 11,660,282.89 11,670,159.30 11,670,159.30 11,686,911.97 11,686,911.97 11,694,973.14 11,694,973.14 11,677,144.49 22,380,997.98
87 Box Culvert Type DUB 200×200 M' 12,414,493.76 12,414,493.76 12,401,946.95 12,401,946.95 12,383,906.14 12,383,906.14 12,377,099.46 12,377,099.46 12,387,583.02 12,387,583.02 12,405,365.56 12,405,365.56 12,413,922.29 12,413,922.29 12,394,997.63 23,756,871.12
88 Box Culvert Type uk 300×200 M' 13,404,600.60 13,404,600.60 13,391,053.13 13,391,053.13 13,371,573.49 13,371,573.49 13,364,223.95 13,364,223.95 13,375,543.61 13,375,543.61 13,394,744.39 13,394,744.39 13,403,983.55 13,403,983.55 13,383,549.57 25,651,579.12
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 174,724.74 174,724.74 174,548.15 174,548.15 174,294.24 174,294.24 174,198.44 174,198.44 174,345.99 174,345.99 174,596.26 174,596.26 174,716.69 174,716.69 174,450.34 334,360.23
91 Ducting (Strand Prestress) M' 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 1,958,122.04 1,958,122.04 1,956,143.05 1,956,143.05 1,953,297.50 1,953,297.50 1,952,223.89 1,952,223.89 1,953,877.45 1,953,877.45 1,956,682.27 1,956,682.27 1,958,031.91 1,958,031.91 1,955,046.94 3,747,140.56
94 Expansion Join Tipe Rubber M' 1,416,877.03 1,416,877.03 1,415,445.05 1,415,445.05 1,413,386.04 1,413,386.04 1,412,609.18 1,412,609.18 1,413,805.68 1,413,805.68 1,415,835.22 1,415,835.22 1,416,811.81 1,416,811.81 1,414,651.92 2,711,392.47
95 Expansion Join Tipe Torma M' 1,625,743.38 1,625,743.38 1,624,100.31 1,624,100.31 1,621,737.77 1,621,737.77 1,620,846.40 1,620,846.40 1,622,219.28 1,622,219.28 1,624,547.99 1,624,547.99 1,625,668.54 1,625,668.54 1,623,190.26 3,111,087.47
96 Expansion Tipe Joint Asphaltic Plug M' 1,927,997.09 1,927,997.09 1,926,048.54 1,926,048.54 1,923,246.77 1,923,246.77 1,922,189.68 1,922,189.68 1,923,817.79 1,923,817.79 1,926,579.46 1,926,579.46 1,927,908.34 1,927,908.34 1,924,969.30 3,689,492.24
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
99 Glass Bead Kg 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
100 Joint Sealent Kg 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
101 Joint Socket Pile 16×16×16 Set 82,341.54 82,341.54 82,258.32 82,258.32 82,138.66 82,138.66 82,093.52 82,093.52 82,163.05 82,163.05 82,281.00 82,281.00 82,337.75 82,337.75 82,212.23 157,572.06
102 Joint Socket Pile 35×35 Set 703,919.77 703,919.77 703,208.35 703,208.35 702,185.41 702,185.41 701,799.46 701,799.46 702,393.89 702,393.89 703,402.19 703,402.19 703,887.37 703,887.37 702,814.31 1,347,048.99
103 Kawat Beton Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
104 Kawat Bronjong Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
105 Kawat Las Dos 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
106 Kayu Acuan (Kelas III/Meranti) M3 3,868,044.16 3,868,044.16 3,864,134.89 3,864,134.89 3,858,513.83 3,858,513.83 3,856,393.04 3,856,393.04 3,859,659.45 3,859,659.45 3,865,200.04 3,865,200.04 3,867,866.11 3,867,866.11 3,861,969.66 7,402,043.81
107 Kayu Perancah (Gelam) M3 2,492,337.90 2,492,337.90 2,489,819.00 2,489,819.00 2,486,197.12 2,486,197.12 2,484,830.61 2,484,830.61 2,486,935.29 2,486,935.29 2,490,505.32 2,490,505.32 2,492,223.18 2,492,223.18 2,488,423.85 4,769,437.36
108 Kerb Pracetak Type 1 (Peninggi) Buah 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
110 Marmer Nama Jembatan Buah 540,240.85 540,240.85 539,694.85 539,694.85 538,909.77 538,909.77 538,613.57 538,613.57 539,069.78 539,069.78 539,843.62 539,843.62 540,215.98 540,215.98 539,392.44 1,033,826.47
111 Mata Kucing Buah 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
112 Matras Concrete (Tebal=10 cm) M2 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 251,730.98
113 Mini Pile 16×16×16 M' 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 234,436.49
114 Mini Timber Pile Buah 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
115 Multipleks 12 mm Lbr 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 59,806,068.05 59,806,068.05 59,745,624.57 59,745,624.57 59,658,714.05 59,658,714.05 59,625,923.29 59,625,923.29 59,676,427.19 59,676,427.19 59,762,093.52 59,762,093.52 59,803,315.04 59,803,315.04 59,712,146.61 114,447,280.62
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 84,724,426.27 84,724,426.27 84,638,798.85 84,638,798.85 84,515,676.83 84,515,676.83 84,469,223.71 84,469,223.71 84,540,770.19 84,540,770.19 84,662,129.62 84,662,129.62 84,720,526.20 84,720,526.20 84,591,372.21 162,132,046.21
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 161,932,676.38 161,932,676.38 161,769,017.83 161,769,017.83 161,533,696.34 161,533,696.34 161,444,911.11 161,444,911.11 161,581,656.95 161,581,656.95 161,813,609.63 161,813,609.63 161,925,222.24 161,925,222.24 161,678,371.92 309,880,837.51
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 212,348,796.11 212,348,796.11 212,134,184.10 212,134,184.10 211,825,597.62 211,825,597.62 211,709,169.99 211,709,169.99 211,888,490.28 211,888,490.28 212,192,659.12 212,192,659.12 212,339,021.19 212,339,021.19 212,015,316.50 406,359,137.96
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 270,688,783.04 270,688,783.04 270,415,209.26 270,415,209.26 270,021,842.77 270,021,842.77 269,873,428.22 269,873,428.22 270,102,014.35 270,102,014.35 270,489,749.50 270,489,749.50 270,676,322.59 270,676,322.59 270,263,684.37 518,000,867.19
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 326,585,636.16 326,585,636.16 326,255,569.78 326,255,569.78 325,780,973.66 325,780,973.66 325,601,911.71 325,601,911.71 325,877,700.56 325,877,700.56 326,345,502.47 326,345,502.47 326,570,602.64 326,570,602.64 326,072,755.22 624,967,317.97
124 Pelat Rambu (Eng. Grade) Buah 188,783.05 188,783.05 188,592.25 188,592.25 188,317.91 188,317.91 188,214.41 188,214.41 188,373.83 188,373.83 188,644.24 188,644.24 188,774.36 188,774.36 188,486.58 361,262.78
125 Pelat Rambu (High L Grade) Buah 219,912.17 219,912.17 219,689.91 219,689.91 219,370.33 219,370.33 219,249.76 219,249.76 219,435.47 219,435.47 219,750.47 219,750.47 219,902.04 219,902.04 219,566.81 420,832.71
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
128 Pipa Drainase Baja Dia 3" M' 248,028.79 248,028.79 247,778.12 247,778.12 247,417.68 247,417.68 247,281.69 247,281.69 247,491.14 247,491.14 247,846.42 247,846.42 248,017.37 248,017.37 247,639.28 474,637.80
129 Pipa Galvanis Dia 1,5" M' 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 240,201.32
130 Pipa Galvanis Dia 2" M' 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
131 Pipa Galvanis Dia 3" M' 216,899.67 216,899.67 216,680.46 216,680.46 216,365.26 216,365.26 216,246.34 216,246.34 216,429.50 216,429.50 216,740.19 216,740.19 216,889.69 216,889.69 216,559.05 415,067.88
132 Pipa Porus M' 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
133 Pipa PVC Dia 4" M' 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
134 Plastik Filter M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
135 Rel Pengaman M' 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,847,663.88 1,847,663.88 1,845,796.52 1,845,796.52 1,843,111.49 1,843,111.49 1,842,098.44 1,842,098.44 1,843,658.72 1,843,658.72 1,846,305.32 1,846,305.32 1,847,578.83 1,847,578.83 1,844,762.24 3,535,763.40
137 Strip Bearing Buah 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
138 Tiang Pancang Baja Diameter 400 M' 654,715.68 654,715.68 654,053.98 654,053.98 653,102.55 653,102.55 652,743.58 652,743.58 653,296.46 653,296.46 654,234.28 654,234.28 654,685.54 654,685.54 653,687.49 1,252,890.07
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 800,319.63 800,319.63 799,510.78 799,510.78 798,347.75 798,347.75 797,908.94 797,908.94 798,584.78 798,584.78 799,731.16 799,731.16 800,282.78 800,282.78 799,062.78 1,531,523.60
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,672,939.14 1,672,939.14 1,671,248.37 1,671,248.37 1,668,817.25 1,668,817.25 1,667,900.00 1,667,900.00 1,669,312.73 1,669,312.73 1,671,709.05 1,671,709.05 1,672,862.13 1,672,862.13 1,670,311.90 3,201,403.16
HARGA SATUAN DASAR UPAH KABUPATEN PACITAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
2 Tukang OH 111,000 111,000 111,300.33 111,300.33 111,453.76 111,453.76 111,456.87 111,456.87 111,309.66 111,309.66 111,150.66 111,150.66 111,126.60 111,126.60 111,257.06 111,257.06 111,418.86 111,418.86
3 Mandor OH 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
4 Operator OH 263,000 263,000 263,711.59 263,711.59 264,075.14 264,075.14 264,082.49 264,082.49 263,733.70 263,733.70 263,356.98 263,356.98 263,299.97 263,299.97 263,609.07 263,609.07 263,992.44 263,992.44
5 Pembantu Operator OH 164,000 164,000 164,443.73 164,443.73 164,670.43 164,670.43 164,675.01 164,675.01 164,457.52 164,457.52 164,222.60 164,222.60 164,187.05 164,187.05 164,379.80 164,379.80 164,618.86 164,618.86
6 Sopir OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
7 Pembantu Sopir OH 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
8 Mekanik OH 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
9 Pembantu Mekanik OH 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
10 Kepala Tukang OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
11 Pemasak Aspal OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15

HARGA SATUAN DASAR ALAT KABUPATEN PACITAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 387,349 433,000 388,397.20 434,171.55 388,932.64 434,770.09 388,943.47 434,782.19 388,429.77 434,207.96 387,874.93 433,587.73 387,790.97 433,493.87 388,246.20 434,002.76 388,810.85 434,633.95
2 Asphalt Distribution Unit/Jam 238,495 307,000 239,140.53 307,830.64 239,470.20 308,255.01 239,476.87 308,263.59 239,160.58 307,856.45 238,818.96 307,416.70 238,767.26 307,350.16 239,047.56 307,710.96 239,395.21 308,158.48
3 Asphalt Finisher Unit/Jam 175,171 831,000 175,644.59 833,248.40 175,886.73 834,397.10 175,891.63 834,420.33 175,659.32 833,318.27 175,408.41 832,127.95 175,370.44 831,947.82 175,576.31 832,924.46 175,831.66 834,135.82
4 Asphalt Liquid Mixer Unit/Jam 62,502 114,000 62,671.31 114,308.44 62,757.71 114,466.03 62,759.46 114,469.22 62,676.57 114,318.03 62,587.04 114,154.74 62,573.49 114,130.03 62,646.95 114,264.01 62,738.06 114,430.18
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 83,885 83,885 84,111.50 84,111.50 84,227.45 84,227.45 84,229.79 84,229.79 84,118.55 84,118.55 83,998.39 83,998.39 83,980.21 83,980.21 84,078.80 84,078.80 84,201.07 84,201.07
6 Asphalt Mixing Plant Unit/Jam 937,533 5,850,504 940,069.65 5,866,333.44 941,365.62 5,874,420.70 941,391.83 5,874,584.22 940,148.48 5,866,825.38 938,805.56 5,858,445.13 938,602.34 5,857,176.92 939,704.19 5,864,052.83 941,070.84 5,872,581.15
7 Asphalt Sprayer Unit/Jam 77,305 81,210 77,514.52 81,429.73 77,621.38 81,541.98 77,623.54 81,544.25 77,521.02 81,436.55 77,410.28 81,320.23 77,393.53 81,302.63 77,484.38 81,398.07 77,597.07 81,516.45
8 Asphalt Tanker Unit/Jam 361,855 419,000 362,833.90 420,133.67 363,334.10 420,712.86 363,344.21 420,724.57 362,864.33 420,168.90 362,346.01 419,568.73 362,267.57 419,477.90 362,692.84 419,970.34 363,220.32 420,581.12
9 Blending Equipment Unit/Jam 117,603 186,000 117,921.02 186,503.25 118,083.58 186,760.36 118,086.87 186,765.56 117,930.91 186,518.89 117,762.45 186,252.47 117,736.96 186,212.15 117,875.17 186,430.75 118,046.61 186,701.88
10 Bore Pile Machine Unit/Jam 324,025 563,000 324,901.27 564,523.28 325,349.17 565,301.53 325,358.23 565,317.26 324,928.51 564,570.62 324,464.38 563,764.18 324,394.14 563,642.14 324,774.96 564,303.82 325,247.29 565,124.51
11 Bore Pile Machine Dia 60 Unit/Jam 212,179 641,000 212,752.61 642,734.32 213,045.90 643,620.39 213,051.83 643,638.31 212,770.45 642,788.22 212,466.52 641,870.06 212,420.53 641,731.11 212,669.90 642,484.45 212,979.19 643,418.84
12 Bore Pile Machine Dia 80 Unit/Jam 838,845 838,845 841,114.95 841,114.95 842,274.50 842,274.50 842,297.95 842,297.95 841,185.49 841,185.49 839,983.93 839,983.93 839,802.09 839,802.09 840,787.96 840,787.96 842,010.75 842,010.75
13 Bulldozer 100-150 HP Unit/Jam 328,959 488,662 329,849.00 489,984.15 330,303.73 490,659.64 330,312.92 490,673.30 329,876.66 490,025.24 329,405.46 489,325.28 329,334.15 489,219.35 329,720.77 489,793.66 330,200.29 490,505.99
14 Cement Tanker Unit/Jam 305,932 395,000 306,759.57 396,068.73 307,182.47 396,614.75 307,191.02 396,625.79 306,785.30 396,101.95 306,347.08 395,536.15 306,280.76 395,450.53 306,640.31 395,914.76 307,086.27 396,490.55
15 Cold Milling Unit/Jam 477,813 1,393,026 479,105.67 1,396,795.05 479,766.16 1,398,720.65 479,779.52 1,398,759.59 479,145.85 1,396,912.18 478,461.43 1,394,916.81 478,357.86 1,394,614.85 478,919.42 1,396,252.02 479,615.93 1,398,282.65
16 Cold Recycler Unit/Jam 4,023,990 4,024,000 4,034,877.90 4,034,887.55 4,040,440.34 4,040,450.00 4,040,552.81 4,040,562.47 4,035,216.26 4,035,225.91 4,029,452.30 4,029,461.94 4,028,580.03 4,028,589.66 4,033,309.29 4,033,318.94 4,039,175.10 4,039,184.75
17 Compressor 4000-6500 L\M Unit/Jam 122,537 154,499 122,868.75 154,917.02 123,038.14 155,130.59 123,041.56 155,134.91 122,879.06 154,930.01 122,703.53 154,708.71 122,676.97 154,675.22 122,820.99 154,856.79 122,999.61 155,082.01
18 Concrete Breaker Unit/Jam 446,562 851,000 447,770.02 853,302.51 448,387.31 854,478.86 448,399.79 854,502.65 447,807.57 853,374.07 447,167.91 852,155.10 447,071.11 851,970.63 447,595.94 852,970.78 448,246.90 854,211.29
19 Concrete Mixer (350) Unit/Jam 83,062 83,062 83,286.87 83,286.87 83,401.69 83,401.69 83,404.01 83,404.01 83,293.86 83,293.86 83,174.88 83,174.88 83,156.87 83,156.87 83,254.49 83,254.49 83,375.57 83,375.57
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 94,576 94,576 94,831.59 94,831.59 94,962.32 94,962.32 94,964.96 94,964.96 94,839.54 94,839.54 94,704.07 94,704.07 94,683.57 94,683.57 94,794.72 94,794.72 94,932.58 94,932.58
21 Concrete Pan Mixer Unit/Jam 251,654 539,000 252,334.49 540,458.35 252,682.35 541,203.42 252,689.38 541,218.48 252,355.65 540,503.67 251,995.18 539,731.61 251,940.63 539,614.77 252,236.39 540,248.24 252,603.22 541,033.94
22 Concrete Pump Unit/Jam 191,619 245,245 192,137.04 245,908.55 192,401.92 246,247.55 192,407.28 246,254.41 192,153.16 245,929.17 191,878.68 245,577.88 191,837.14 245,524.72 192,062.35 245,812.95 192,341.67 246,170.44
23 Concrete Vibrator Unit/Jam 71,549 71,549 71,742.16 71,742.16 71,841.06 71,841.06 71,843.06 71,843.06 71,748.17 71,748.17 71,645.69 71,645.69 71,630.18 71,630.18 71,714.27 71,714.27 71,818.56 71,818.56
24 Crane 10-15 Ton Unit/Jam 256,588 381,711 257,282.22 382,743.78 257,636.91 383,271.42 257,644.08 383,282.09 257,303.80 382,775.87 256,936.26 382,229.11 256,880.64 382,146.37 257,182.20 382,594.98 257,556.23 383,151.40
25 Crane On Track 35 Ton Unit/Jam 213,001 443,944 213,577.23 445,145.16 213,871.66 445,758.83 213,877.62 445,771.24 213,595.14 445,182.49 213,290.04 444,546.58 213,243.86 444,450.35 213,494.20 444,972.10 213,804.69 445,619.24
26 Crane On Track 75-100 Ton Unit/Jam 334,716 507,000 335,621.36 508,371.77 336,084.04 509,072.60 336,093.40 509,086.77 335,649.50 508,414.40 335,170.06 507,688.17 335,097.50 507,578.27 335,490.88 508,174.13 335,978.80 508,913.19
27 Dump Truck 10 Ton Unit/Jam 316,623 350,783 317,479.66 351,732.10 317,917.34 352,216.99 317,926.19 352,226.80 317,506.29 351,761.59 317,052.76 351,259.13 316,984.12 351,183.09 317,356.24 351,595.36 317,817.78 352,106.70
28 Dump Truck 3-4 M3 Unit/Jam 172,703 257,901 173,170.73 258,598.79 173,409.46 258,955.29 173,414.28 258,962.50 173,185.25 258,620.48 172,937.87 258,251.06 172,900.43 258,195.15 173,103.40 258,498.26 173,355.15 258,874.20
29 Excavator 80-140 HP Unit/Jam 250,009 451,417 250,685.24 452,638.38 251,030.83 453,262.38 251,037.82 453,275.00 250,706.26 452,676.34 250,348.15 452,029.73 250,293.96 451,931.87 250,587.78 452,462.41 250,952.22 453,120.44
30 Flat Bed Truck 3-4 M3 Unit/Jam 303,465 405,000 304,285.70 406,095.79 304,705.19 406,655.63 304,713.67 406,666.95 304,311.22 406,129.84 303,876.54 405,549.72 303,810.76 405,461.93 304,167.41 405,937.91 304,609.77 406,528.29
31 Fulvi Mixer Unit/Jam 759,895 1,187,000 761,951.19 1,190,211.61 763,001.61 1,191,852.42 763,022.85 1,191,885.60 762,015.09 1,190,311.42 760,926.62 1,188,611.16 760,761.89 1,188,353.86 761,654.97 1,189,748.90 762,762.68 1,191,479.20
32 Generator Set Unit/Jam 338,005 546,712 338,919.85 548,191.21 339,387.08 548,946.94 339,396.53 548,962.22 338,948.27 548,237.18 338,464.11 547,454.07 338,390.84 547,335.56 338,788.09 547,978.10 339,280.80 548,775.04
33 Hot Recycler Unit/Jam 2,482,818 7,281,000 2,489,535.33 7,300,699.86 2,492,967.38 7,310,764.52 2,493,036.78 7,310,968.04 2,489,744.10 7,301,312.09 2,486,187.72 7,290,882.80 2,485,649.52 7,289,304.51 2,488,567.50 7,297,861.63 2,492,186.72 7,308,475.20
34 Jack Hammer Unit/Jam 46,877 46,877 47,003.48 47,003.48 47,068.28 47,068.28 47,069.59 47,069.59 47,007.42 47,007.42 46,940.28 46,940.28 46,930.12 46,930.12 46,985.21 46,985.21 47,053.54 47,053.54
35 Launching Gantry Unit/Jam 59,655,884 59,655,884 59,817,291.65 59,817,291.65 59,899,755.08 59,899,755.08 59,901,422.54 59,901,422.54 59,822,307.84 59,822,307.84 59,736,856.87 59,736,856.87 59,723,925.37 59,723,925.37 59,794,036.96 59,794,036.96 59,880,997.80 59,880,997.80
36 Motor Grader > 100 HP Unit/Jam 234,383 524,477 235,017.41 525,896.05 235,341.41 526,621.05 235,347.96 526,635.71 235,037.12 525,940.15 234,701.39 525,188.89 234,650.58 525,075.20 234,926.05 525,691.60 235,267.71 526,456.14
37 Pedestrian Roller Unit/Jam 77,305 77,305 77,514.52 77,514.52 77,621.38 77,621.38 77,623.54 77,623.54 77,521.02 77,521.02 77,410.28 77,410.28 77,393.53 77,393.53 77,484.38 77,484.38 77,597.07 77,597.07
38 Pile Driver + Hammer Unit/Jam 87,997 257,000 88,234.61 257,695.35 88,356.25 258,050.61 88,358.71 258,057.79 88,242.01 257,716.96 88,115.96 257,348.84 88,096.89 257,293.13 88,200.31 257,595.17 88,328.58 257,969.80
39 Rock Drill Breaker Unit/Jam 85,529 278,000 85,760.74 278,752.17 85,878.97 279,136.46 85,881.36 279,144.23 85,767.93 278,775.55 85,645.42 278,377.34 85,626.88 278,317.08 85,727.40 278,643.80 85,852.08 279,049.05
40 Split Form Paver Unit/Jam 180,927 180,927 181,416.95 181,416.95 181,667.05 181,667.05 181,672.11 181,672.11 181,432.16 181,432.16 181,173.00 181,173.00 181,133.78 181,133.78 181,346.42 181,346.42 181,610.16 181,610.16
41 Stone Crusher Unit/Jam 484,392 717,564 485,702.65 719,505.48 486,372.24 720,497.38 486,385.78 720,517.44 485,743.38 719,565.82 485,049.54 718,537.98 484,944.54 718,382.43 485,513.83 719,225.76 486,219.93 720,271.76
42 Tamper Unit/Jam 72,371 72,371 72,566.78 72,566.78 72,666.82 72,666.82 72,668.84 72,668.84 72,572.87 72,572.87 72,469.20 72,469.20 72,453.51 72,453.51 72,538.57 72,538.57 72,644.06 72,644.06
43 Tandem Roller 6-8 T Unit/Jam 349,519 349,519 350,464.56 350,464.56 350,947.71 350,947.71 350,957.48 350,957.48 350,493.95 350,493.95 349,993.30 349,993.30 349,917.54 349,917.54 350,328.32 350,328.32 350,837.81 350,837.81
44 Three Wheel Roller 6-8 T Unit/Jam 115,958 186,903 116,271.77 187,408.69 116,432.06 187,667.05 116,435.30 187,672.28 116,281.52 187,424.41 116,115.43 187,156.69 116,090.29 187,116.18 116,226.57 187,335.84 116,395.60 187,608.29
45 Tire Roller 8-10 T Unit/Jam 207,244 374,000 207,804.87 375,011.91 208,091.35 375,528.90 208,097.14 375,539.36 207,822.30 375,043.36 207,525.44 374,507.65 207,480.52 374,426.57 207,724.08 374,866.12 208,026.19 375,411.31
46 Track Loader 75-100 HP Unit/Jam 194,086 417,797 194,610.91 418,927.41 194,879.20 419,504.94 194,884.62 419,516.62 194,627.23 418,962.54 194,349.22 418,364.09 194,307.15 418,273.53 194,535.25 418,764.55 194,818.17 419,373.58
47 Trailer 20 Ton Unit/Jam 313,333 452,450 314,181.17 453,674.17 314,614.30 454,299.60 314,623.06 454,312.25 314,207.52 453,712.22 313,758.70 453,064.13 313,690.78 452,966.05 314,059.03 453,497.80 314,515.78 454,157.34
48 Trailler 15 Ton Unit/Jam 271,391 413,000 272,125.43 414,117.43 272,500.57 414,688.33 272,508.16 414,699.88 272,148.25 414,152.16 271,759.51 413,560.58 271,700.68 413,471.06 272,019.63 413,956.44 272,415.24 414,558.47
49 Truck Mixer (agitator) Unit/Jam 341,295 502,000 342,218.34 503,358.24 342,690.12 504,052.16 342,699.66 504,066.19 342,247.04 503,400.45 341,758.17 502,681.39 341,684.18 502,572.57 342,085.30 503,162.55 342,582.80 503,894.32
50 Vibrating Rammer Unit/Jam 69,904 69,904 70,092.91 70,092.91 70,189.54 70,189.54 70,191.50 70,191.50 70,098.79 70,098.79 69,998.66 69,998.66 69,983.51 69,983.51 70,065.66 70,065.66 70,167.56 70,167.56
51 Vibratory Roller 5-8 T Unit/Jam 168,591 362,000 169,047.61 362,979.45 169,280.66 363,479.85 169,285.37 363,489.96 169,061.79 363,009.89 168,820.30 362,491.36 168,783.75 362,412.89 168,981.89 362,838.33 169,227.65 363,366.02
52 Water Pump 70-100 MM Unit/Jam 52,633 52,633 52,775.84 52,775.84 52,848.60 52,848.60 52,850.07 52,850.07 52,780.27 52,780.27 52,704.87 52,704.87 52,693.46 52,693.46 52,755.32 52,755.32 52,832.05 52,832.05
53 Water Tanker 3000-4500 L Unit/Jam 190,796 224,499 191,312.42 225,106.42 191,576.16 225,416.75 191,581.49 225,423.02 191,328.46 225,125.29 191,055.17 224,803.72 191,013.81 224,755.06 191,238.05 225,018.90 191,516.17 225,346.16
54 Welding Set Unit/Jam 106,912 106,912 107,200.93 107,200.93 107,348.71 107,348.71 107,351.70 107,351.70 107,209.91 107,209.91 107,056.77 107,056.77 107,033.60 107,033.60 107,159.25 107,159.25 107,315.10 107,315.10
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 185,862 429,653 186,364.69 430,815.49 186,621.61 431,409.41 186,626.80 431,421.42 186,380.31 430,851.62 186,114.09 430,236.19 186,073.80 430,143.05 186,292.23 430,648.01 186,563.17 431,274.32
HARGA SATUAN DASAR BAHAN KABUPATEN PACITAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 259,000 259,000 259,700.76 259,700.76 260,058.78 260,058.78 260,066.02 260,066.02 259,722.54 259,722.54 259,351.55 259,351.55 259,295.41 259,295.41 259,599.80 259,599.80 259,977.35 259,977.35
2 Agregat Pecah Mesin 20-30 mm M3 250,000 250,000 250,676.41 250,676.41 251,021.99 251,021.99 251,028.98 251,028.98 250,697.43 250,697.43 250,339.34 250,339.34 250,285.14 250,285.14 250,578.96 250,578.96 250,943.39 250,943.39
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
4 Bahan Agr. Base Kelas A M3 271,000 271,000 271,733.23 271,733.23 272,107.84 272,107.84 272,115.42 272,115.42 271,756.02 271,756.02 271,367.84 271,367.84 271,309.10 271,309.10 271,627.59 271,627.59 272,022.63 272,022.63
5 Bahan Agr. Base Kelas B M3 255,000 255,000 255,689.94 255,689.94 256,042.43 256,042.43 256,049.56 256,049.56 255,711.38 255,711.38 255,346.12 255,346.12 255,290.85 255,290.85 255,590.54 255,590.54 255,962.25 255,962.25
6 Bahan Agr. Base Kelas C M3 234,000 234,000 234,633.12 234,633.12 234,956.59 234,956.59 234,963.13 234,963.13 234,652.80 234,652.80 234,317.62 234,317.62 234,266.89 234,266.89 234,541.91 234,541.91 234,883.01 234,883.01
7 Bahan Agr. Base Kelas C2 M3 214,000 214,000 214,579.01 214,579.01 214,874.83 214,874.83 214,880.81 214,880.81 214,597.00 214,597.00 214,290.47 214,290.47 214,244.08 214,244.08 214,495.59 214,495.59 214,807.54 214,807.54
8 Bahan Agr. Base Kelas S M3 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
9 Bahan Pilihan M3 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
10 Bahan Tanah Timbunan M3 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
11 Batu Belah/Kerakal M3 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
12 Batu Kali M3 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
13 Chipping M3 183,000 183,000 183,495.13 183,495.13 183,748.10 183,748.10 183,753.21 183,753.21 183,510.52 183,510.52 183,248.39 183,248.39 183,208.72 183,208.72 183,423.80 183,423.80 183,690.56 183,690.56
14 Chipping (kg) Kg 237 237 237.64 237.64 237.97 237.97 237.98 237.98 237.66 237.66 237.32 237.32 237.27 237.27 237.55 237.55 237.89 237.89
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 5,000 5,000 5,013.53 5,013.53 5,020.44 5,020.44 5,020.58 5,020.58 5,013.95 5,013.95 5,006.79 5,006.79 5,005.70 5,005.70 5,011.58 5,011.58 5,018.87 5,018.87
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 328,000 328,000 328,887.45 328,887.45 329,340.85 329,340.85 329,350.02 329,350.02 328,915.03 328,915.03 328,445.21 328,445.21 328,374.11 328,374.11 328,759.60 328,759.60 329,237.72 329,237.72
18 Kapur M3 82,000 82,000 82,221.86 82,221.86 82,335.21 82,335.21 82,337.51 82,337.51 82,228.76 82,228.76 82,111.30 82,111.30 82,093.53 82,093.53 82,189.90 82,189.90 82,309.43 82,309.43
19 Pasir Beton (Kasar) M3 391,000 391,000 392,057.91 392,057.91 392,598.40 392,598.40 392,609.33 392,609.33 392,090.79 392,090.79 391,530.72 391,530.72 391,445.96 391,445.96 391,905.49 391,905.49 392,475.46 392,475.46
20 Pasir Halus (untuk HRS) M3 247,000 247,000 247,668.30 247,668.30 248,009.73 248,009.73 248,016.63 248,016.63 247,689.07 247,689.07 247,335.26 247,335.26 247,281.72 247,281.72 247,572.01 247,572.01 247,932.07 247,932.07
21 Pasir Pasang (Sedang) M3 276,000 276,000 276,746.76 276,746.76 277,128.28 277,128.28 277,135.99 277,135.99 276,769.97 276,769.97 276,374.63 276,374.63 276,314.80 276,314.80 276,639.17 276,639.17 277,041.50 277,041.50
22 Pasir Urug M3 168,000 168,000 168,454.55 168,454.55 168,686.78 168,686.78 168,691.48 168,691.48 168,468.68 168,468.68 168,228.03 168,228.03 168,191.62 168,191.62 168,389.06 168,389.06 168,633.96 168,633.96
23 Pasir Urug (ada unsur lempung) M3 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
24 Sirtu M3 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 58,000 58,000 58,156.93 58,156.93 58,237.10 58,237.10 58,238.72 58,238.72 58,161.80 58,161.80 58,078.73 58,078.73 58,066.15 58,066.15 58,134.32 58,134.32 58,218.87 58,218.87
26 Anti Pengelupas Liter 83,000 83,000 83,224.57 83,224.57 83,339.30 83,339.30 83,341.62 83,341.62 83,231.55 83,231.55 83,112.66 83,112.66 83,094.67 83,094.67 83,192.21 83,192.21 83,313.20 83,313.20
27 Arbocell Kg 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
28 Asbuton Curah Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,500 8,500 8,523.00 8,523.00 8,534.75 8,534.75 8,534.99 8,534.99 8,523.71 8,523.71 8,511.54 8,511.54 8,509.69 8,509.69 8,519.68 8,519.68 8,532.08 8,532.08
30 Aspal Emulsi (CSS-1) Kg 8,500 8,500 8,523.00 8,523.00 8,534.75 8,534.75 8,534.99 8,534.99 8,523.71 8,523.71 8,511.54 8,511.54 8,509.69 8,509.69 8,519.68 8,519.68 8,532.08 8,532.08
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
33 Aspal Modifikasi (JAP-57) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
34 Aspal Modifikasi (Retona) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
35 Aspal Modifikasi (Starbit) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
36 Aspal Minyak (Curah) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
37 Assetilline Botol 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
40 Beton B-0 M3 485,214 485,214 486,527.28 486,527.28 487,198.00 487,198.00 487,211.56 487,211.56 486,568.08 486,568.08 485,873.06 485,873.06 485,767.88 485,767.88 486,338.13 486,338.13 487,045.43 487,045.43
41 Beton K-125 (fc' 10 MPa) M3 501,662 501,662 503,019.73 503,019.73 503,713.18 503,713.18 503,727.21 503,727.21 503,061.91 503,061.91 502,343.33 502,343.33 502,234.58 502,234.58 502,824.17 502,824.17 503,555.45 503,555.45
42 Beton K-175 (fc' 15 MPa) M3 542,782 542,782 544,250.85 544,250.85 545,001.15 545,001.15 545,016.32 545,016.32 544,296.49 544,296.49 543,519.01 543,519.01 543,401.35 543,401.35 544,039.27 544,039.27 544,830.48 544,830.48
43 Beton K-250 (fc' 20 MPa) M3 604,462 604,462 606,097.54 606,097.54 606,933.10 606,933.10 606,949.99 606,949.99 606,148.37 606,148.37 605,282.53 605,282.53 605,151.51 605,151.51 605,861.91 605,861.91 606,743.04 606,743.04
44 Beton K-300 (fc' 25 MPa) M3 629,134 629,134 630,836.21 630,836.21 631,705.88 631,705.88 631,723.46 631,723.46 630,889.11 630,889.11 629,987.94 629,987.94 629,851.57 629,851.57 630,590.97 630,590.97 631,508.06 631,508.06
45 Beton K-350 (fc' 30 MPa) M3 653,806 653,806 655,574.89 655,574.89 656,478.66 656,478.66 656,496.93 656,496.93 655,629.86 655,629.86 654,693.35 654,693.35 654,551.63 654,551.63 655,320.03 655,320.03 656,273.08 656,273.08
46 Beton K-400 (fc' 35 MPa) M3 678,478 678,478 680,313.56 680,313.56 681,251.44 681,251.44 681,270.40 681,270.40 680,370.61 680,370.61 679,398.76 679,398.76 679,251.69 679,251.69 680,049.08 680,049.08 681,038.11 681,038.11
47 Beton K-450 (fc' 40 MPa) M3 711,374 711,374 713,298.46 713,298.46 714,281.81 714,281.81 714,301.69 714,301.69 713,358.28 713,358.28 712,339.31 712,339.31 712,185.11 712,185.11 713,021.16 713,021.16 714,058.14 714,058.14
48 Beton K-500 (fc' 45 MPa) M3 740,158 740,158 742,160.25 742,160.25 743,183.39 743,183.39 743,204.07 743,204.07 742,222.49 742,222.49 741,162.29 741,162.29 741,001.84 741,001.84 741,871.73 741,871.73 742,950.66 742,950.66
49 Bunker Oil Liter 3,000 3,000 3,008.12 3,008.12 3,012.26 3,012.26 3,012.35 3,012.35 3,008.37 3,008.37 3,004.07 3,004.07 3,003.42 3,003.42 3,006.95 3,006.95 3,011.32 3,011.32
50 Cat Kg 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
51 Cat Anti Karat Kg 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
52 Cat Marka (Non Thermoplas) Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
53 Cat Marka (Thermoplastic) Kg 42,500 42,500 42,614.99 42,614.99 42,673.74 42,673.74 42,674.93 42,674.93 42,618.56 42,618.56 42,557.69 42,557.69 42,548.47 42,548.47 42,598.42 42,598.42 42,660.38 42,660.38
54 Cerucuk Diameter 10-15 cm M' 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
55 Cold Mix (Aspal Dingin) Kg 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,345,000 1,345,000 1,348,639.10 1,348,639.10 1,350,498.32 1,350,498.32 1,350,535.92 1,350,535.92 1,348,752.20 1,348,752.20 1,346,825.62 1,346,825.62 1,346,534.07 1,346,534.07 1,348,114.80 1,348,114.80 1,350,075.42 1,350,075.42
57 Curing Compound Liter 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 502,000 502,000 503,358.24 503,358.24 504,052.16 504,052.16 504,066.19 504,066.19 503,400.45 503,400.45 502,681.39 502,681.39 502,572.57 502,572.57 503,162.55 503,162.55 503,894.32 503,894.32
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 584,000 584,000 585,580.10 585,580.10 586,387.38 586,387.38 586,403.70 586,403.70 585,629.21 585,629.21 584,792.69 584,792.69 584,666.09 584,666.09 585,352.45 585,352.45 586,203.75 586,203.75
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 740,000 740,000 742,002.18 742,002.18 743,025.10 743,025.10 743,045.78 743,045.78 742,064.41 742,064.41 741,004.43 741,004.43 740,844.02 740,844.02 741,713.72 741,713.72 742,792.42 742,792.42
61 Kerosen/Minyak Tanah Liter 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
64 Oxygen (Isi 6 M3) Botol 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
65 Polytene 125 Mikron Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
66 Sand Sheet Ton 1,135,000 1,135,000 1,138,070.92 1,138,070.92 1,139,639.85 1,139,639.85 1,139,671.57 1,139,671.57 1,138,166.35 1,138,166.35 1,136,540.58 1,136,540.58 1,136,294.55 1,136,294.55 1,137,628.48 1,137,628.48 1,139,282.98 1,139,282.98
67 Seal Coat M2 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
68 Seal Guard Kg 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
69 Semen/PC (50 kg) Zak 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
70 Semen/PC (kg) Kg 1,150 1,150 1,153.11 1,153.11 1,154.70 1,154.70 1,154.73 1,154.73 1,153.21 1,153.21 1,151.56 1,151.56 1,151.31 1,151.31 1,152.66 1,152.66 1,154.34 1,154.34
71 Slurry Seal Ton 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
72 Solar Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
73 Thinner Liter 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
75 Baja Prategang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
77 Baja Tulangan (Polos) U25 Kg 10,550 10,550 10,578.54 10,578.54 10,593.13 10,593.13 10,593.42 10,593.42 10,579.43 10,579.43 10,564.32 10,564.32 10,562.03 10,562.03 10,574.43 10,574.43 10,589.81 10,589.81
78 Baja Tulangan (Polos) U32 Kg 10,550 10,550 10,578.54 10,578.54 10,593.13 10,593.13 10,593.42 10,593.42 10,579.43 10,579.43 10,564.32 10,564.32 10,562.03 10,562.03 10,574.43 10,574.43 10,589.81 10,589.81
79 Baja Tulangan (Polos) U36 Kg 10,550 10,550 10,578.54 10,578.54 10,593.13 10,593.13 10,593.42 10,593.42 10,579.43 10,579.43 10,564.32 10,564.32 10,562.03 10,562.03 10,574.43 10,574.43 10,589.81 10,589.81
80 Baja Tulangan (Ulir) D16 Kg 10,950 10,950 10,979.63 10,979.63 10,994.76 10,994.76 10,995.07 10,995.07 10,980.55 10,980.55 10,964.86 10,964.86 10,962.49 10,962.49 10,975.36 10,975.36 10,991.32 10,991.32
81 Baja Tulangan (Ulir) D19 Kg 10,950 10,950 10,979.63 10,979.63 10,994.76 10,994.76 10,995.07 10,995.07 10,980.55 10,980.55 10,964.86 10,964.86 10,962.49 10,962.49 10,975.36 10,975.36 10,991.32 10,991.32
82 Baja Tulangan (Ulir) D24 Kg 10,950 10,950 10,979.63 10,979.63 10,994.76 10,994.76 10,995.07 10,995.07 10,980.55 10,980.55 10,964.86 10,964.86 10,962.49 10,962.49 10,975.36 10,975.36 10,991.32 10,991.32
83 Baja Tulangan (Ulir) D32 Kg 10,950 10,950 10,979.63 10,979.63 10,994.76 10,994.76 10,995.07 10,995.07 10,980.55 10,980.55 10,964.86 10,964.86 10,962.49 10,962.49 10,975.36 10,975.36 10,991.32 10,991.32
84 Baja Tulangan (Ulir) D36 Kg 10,950 10,950 10,979.63 10,979.63 10,994.76 10,994.76 10,995.07 10,995.07 10,980.55 10,980.55 10,964.86 10,964.86 10,962.49 10,962.49 10,975.36 10,975.36 10,991.32 10,991.32
85 Besi Beton Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,691,000 10,691,000 10,719,926.14 10,719,926.14 10,734,704.51 10,734,704.51 10,735,003.33 10,735,003.33 10,720,825.10 10,720,825.10 10,705,511.33 10,705,511.33 10,703,193.86 10,703,193.86 10,715,758.64 10,715,758.64 10,731,342.99 10,731,342.99
87 Box Culvert Type DUB 200×200 M' 11,349,000 11,349,000 11,379,706.46 11,379,706.46 11,395,394.39 11,395,394.39 11,395,711.61 11,395,711.61 11,380,660.74 11,380,660.74 11,364,404.46 11,364,404.46 11,361,944.36 11,361,944.36 11,375,282.46 11,375,282.46 11,391,825.99 11,391,825.99
88 Box Culvert Type uk 300×200 M' 12,254,000 12,254,000 12,287,155.08 12,287,155.08 12,304,094.01 12,304,094.01 12,304,436.52 12,304,436.52 12,288,185.46 12,288,185.46 12,270,632.85 12,270,632.85 12,267,976.57 12,267,976.57 12,282,378.30 12,282,378.30 12,300,241.05 12,300,241.05
89 Casing M2 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
90 Ducting (Kabel Prestress) M' 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
91 Ducting (Strand Prestress) M' 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
92 Expansion Cap M2 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
93 Expansion Join Baja Siku M' 1,790,000 1,790,000 1,794,843.12 1,794,843.12 1,797,317.47 1,797,317.47 1,797,367.50 1,797,367.50 1,794,993.63 1,794,993.63 1,792,429.64 1,792,429.64 1,792,041.62 1,792,041.62 1,794,145.35 1,794,145.35 1,796,754.65 1,796,754.65
94 Expansion Join Tipe Rubber M' 1,296,000 1,296,000 1,299,506.53 1,299,506.53 1,301,298.01 1,301,298.01 1,301,334.24 1,301,334.24 1,299,615.50 1,299,615.50 1,297,759.11 1,297,759.11 1,297,478.18 1,297,478.18 1,299,001.33 1,299,001.33 1,300,890.52 1,300,890.52
95 Expansion Join Tipe Torma M' 1,486,000 1,486,000 1,490,020.60 1,490,020.60 1,492,074.73 1,492,074.73 1,492,116.26 1,492,116.26 1,490,145.55 1,490,145.55 1,488,017.01 1,488,017.01 1,487,694.89 1,487,694.89 1,489,441.34 1,489,441.34 1,491,607.49 1,491,607.49
96 Expansion Tipe Joint Asphaltic Plug M' 1,763,000 1,763,000 1,767,770.07 1,767,770.07 1,770,207.09 1,770,207.09 1,770,256.37 1,770,256.37 1,767,918.31 1,767,918.31 1,765,392.99 1,765,392.99 1,765,010.83 1,765,010.83 1,767,082.82 1,767,082.82 1,769,652.76 1,769,652.76
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
99 Glass Bead Kg 58,000 58,000 58,156.93 58,156.93 58,237.10 58,237.10 58,238.72 58,238.72 58,161.80 58,161.80 58,078.73 58,078.73 58,066.15 58,066.15 58,134.32 58,134.32 58,218.87 58,218.87
100 Joint Sealent Kg 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
101 Joint Socket Pile 16×16×16 Set 75,000 75,000 75,202.92 75,202.92 75,306.60 75,306.60 75,308.69 75,308.69 75,209.23 75,209.23 75,101.80 75,101.80 75,085.54 75,085.54 75,173.69 75,173.69 75,283.02 75,283.02
102 Joint Socket Pile 35×35 Set 643,000 643,000 644,739.74 644,739.74 645,628.57 645,628.57 645,646.54 645,646.54 644,793.80 644,793.80 643,872.77 643,872.77 643,733.39 643,733.39 644,489.08 644,489.08 645,426.39 645,426.39
103 Kawat Beton Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
104 Kawat Bronjong Kg 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
105 Kawat Las Dos 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
106 Kayu Acuan (Kelas III/Meranti) M3 3,536,000 3,536,000 3,545,567.19 3,545,567.19 3,550,455.07 3,550,455.07 3,550,553.90 3,550,553.90 3,545,864.52 3,545,864.52 3,540,799.56 3,540,799.56 3,540,033.06 3,540,033.06 3,544,188.81 3,544,188.81 3,549,343.26 3,549,343.26
107 Kayu Perancah (Gelam) M3 2,278,000 2,278,000 2,284,163.48 2,284,163.48 2,287,312.40 2,287,312.40 2,287,376.07 2,287,376.07 2,284,355.02 2,284,355.02 2,281,092.02 2,281,092.02 2,280,598.22 2,280,598.22 2,283,275.48 2,283,275.48 2,286,596.14 2,286,596.14
108 Kerb Pracetak Type 1 (Peninggi) Buah 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 78,000 78,000 78,211.04 78,211.04 78,318.86 78,318.86 78,321.04 78,321.04 78,217.60 78,217.60 78,105.87 78,105.87 78,088.96 78,088.96 78,180.64 78,180.64 78,294.34 78,294.34
110 Marmer Nama Jembatan Buah 493,000 493,000 494,333.89 494,333.89 495,015.37 495,015.37 495,029.15 495,029.15 494,375.34 494,375.34 493,669.17 493,669.17 493,562.30 493,562.30 494,141.71 494,141.71 494,860.36 494,860.36
111 Mata Kucing Buah 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
112 Matras Concrete (Tebal=10 cm) M2 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
113 Mini Pile 16×16×16 M' 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
114 Mini Timber Pile Buah 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
115 Multipleks 12 mm Lbr 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
116 Paku Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
117 Paving Block (Model Bata 8 cm) M2 78,000 78,000 78,211.04 78,211.04 78,318.86 78,318.86 78,321.04 78,321.04 78,217.60 78,217.60 78,105.87 78,105.87 78,088.96 78,088.96 78,180.64 78,180.64 78,294.34 78,294.34
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 54,672,000 54,672,000 54,819,923.48 54,819,923.48 54,895,497.59 54,895,497.59 54,897,025.75 54,897,025.75 54,824,520.60 54,824,520.60 54,746,208.53 54,746,208.53 54,734,357.38 54,734,357.38 54,798,611.57 54,798,611.57 54,878,307.37 54,878,307.37
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 77,451,000 77,451,000 77,660,555.55 77,660,555.55 77,767,617.50 77,767,617.50 77,769,782.36 77,769,782.36 77,667,068.05 77,667,068.05 77,556,127.40 77,556,127.40 77,539,338.48 77,539,338.48 77,630,364.08 77,630,364.08 77,743,265.00 77,743,265.00
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 148,032,000 148,032,000 148,432,523.27 148,432,523.27 148,637,150.63 148,637,150.63 148,641,288.32 148,641,288.32 148,444,970.60 148,444,970.60 148,232,929.86 148,232,929.86 148,200,841.22 148,200,841.22 148,374,818.34 148,374,818.34 148,590,605.74 148,590,605.74
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 194,120,000 194,120,000 194,645,221.42 194,645,221.42 194,913,557.08 194,913,557.08 194,918,982.98 194,918,982.98 194,661,544.08 194,661,544.08 194,383,486.98 194,383,486.98 194,341,407.92 194,341,407.92 194,569,550.75 194,569,550.75 194,852,520.98 194,852,520.98
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 247,452,000 247,452,000 248,121,519.32 248,121,519.32 248,463,576.79 248,463,576.79 248,470,493.39 248,470,493.39 248,142,326.43 248,142,326.43 247,787,876.68 247,787,876.68 247,734,236.93 247,734,236.93 248,025,059.10 248,025,059.10 248,385,771.80 248,385,771.80
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 298,550,000 298,550,000 299,357,772.79 299,357,772.79 299,770,463.97 299,770,463.97 299,778,808.83 299,778,808.83 299,382,876.50 299,382,876.50 298,955,234.07 298,955,234.07 298,890,517.90 298,890,517.90 299,241,393.86 299,241,393.86 299,676,592.51 299,676,592.51
124 Pelat Rambu (Eng. Grade) Buah 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
125 Pelat Rambu (High L Grade) Buah 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
126 Pemantul Cahaya (Reflector) Buah 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
127 Pipa Baja D10" Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
128 Pipa Drainase Baja Dia 3" M' 226,000 226,000 226,611.48 226,611.48 226,923.88 226,923.88 226,930.20 226,930.20 226,630.48 226,630.48 226,306.76 226,306.76 226,257.77 226,257.77 226,523.38 226,523.38 226,852.82 226,852.82
129 Pipa Galvanis Dia 1,5" M' 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
130 Pipa Galvanis Dia 2" M' 259,000 259,000 259,700.76 259,700.76 260,058.78 260,058.78 260,066.02 260,066.02 259,722.54 259,722.54 259,351.55 259,351.55 259,295.41 259,295.41 259,599.80 259,599.80 259,977.35 259,977.35
131 Pipa Galvanis Dia 3" M' 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
132 Pipa Porus M' 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
133 Pipa PVC Dia 4" M' 98,000 98,000 98,265.15 98,265.15 98,400.62 98,400.62 98,403.36 98,403.36 98,273.39 98,273.39 98,133.02 98,133.02 98,111.78 98,111.78 98,226.95 98,226.95 98,369.81 98,369.81
134 Plastik Filter M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
135 Rel Pengaman M' 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,689,000 1,689,000 1,693,569.85 1,693,569.85 1,695,904.58 1,695,904.58 1,695,951.79 1,695,951.79 1,693,711.87 1,693,711.87 1,691,292.55 1,691,292.55 1,690,926.43 1,690,926.43 1,692,911.45 1,692,911.45 1,695,373.52 1,695,373.52
137 Strip Bearing Buah 259,000 259,000 259,700.76 259,700.76 260,058.78 260,058.78 260,066.02 260,066.02 259,722.54 259,722.54 259,351.55 259,351.55 259,295.41 259,295.41 259,599.80 259,599.80 259,977.35 259,977.35
138 Tiang Pancang Baja Diameter 400 M' 599,000 599,000 600,620.69 600,620.69 601,448.70 601,448.70 601,465.44 601,465.44 600,671.05 600,671.05 599,813.05 599,813.05 599,683.20 599,683.20 600,387.19 600,387.19 601,260.35 601,260.35
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 731,000 731,000 732,977.83 732,977.83 733,988.31 733,988.31 734,008.74 734,008.74 733,039.30 733,039.30 731,992.22 731,992.22 731,833.76 731,833.76 732,692.88 732,692.88 733,758.46 733,758.46
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,530,000 1,530,000 1,534,139.65 1,534,139.65 1,536,254.60 1,536,254.60 1,536,297.36 1,536,297.36 1,534,268.30 1,534,268.30 1,532,076.73 1,532,076.73 1,531,745.08 1,531,745.08 1,533,543.23 1,533,543.23 1,535,773.53 1,535,773.53
HARGA SATUAN DASAR UPAH KABUPATEN PACITAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 99,256.23
2 Tukang OH 111,462.33 111,462.33 111,349.68 111,349.68 111,187.70 111,187.70 111,126.59 111,126.59 111,220.72 111,220.72 111,380.38 111,380.38 111,457.20 111,457.20 111,287.29 111,287.29
3 Mandor OH 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 127,328.70
4 Operator OH 264,095.43 264,095.43 263,828.52 263,828.52 263,444.74 263,444.74 263,299.94 263,299.94 263,522.96 263,522.96 263,901.25 263,901.25 264,083.28 264,083.28 263,680.69 263,680.69
5 Pembantu Operator OH 164,683.08 164,683.08 164,516.65 164,516.65 164,277.33 164,277.33 164,187.03 164,187.03 164,326.10 164,326.10 164,562.00 164,562.00 164,675.50 164,675.50 164,424.46 164,424.46
6 Sopir OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
7 Pembantu Sopir OH 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 107,276.93
8 Mekanik OH 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 148,383.05
9 Pembantu Mekanik OH 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 107,276.93
10 Kepala Tukang OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
11 Pemasak Aspal OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35

HARGA SATUAN DASAR ALAT KABUPATEN PACITAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 388,962.53 434,803.51 388,569.43 434,364.07 388,004.18 433,732.21 387,790.92 433,493.82 388,119.38 433,860.99 388,676.53 434,483.81 388,944.63 434,783.50 388,351.69 790,103.23
2 Asphalt Distribution Unit/Jam 239,488.61 308,278.70 239,246.57 307,967.14 238,898.54 307,519.14 238,767.23 307,350.12 238,969.47 307,610.45 239,312.52 308,052.03 239,477.58 308,264.51 239,112.51 526,977.03
3 Asphalt Finisher Unit/Jam 175,900.25 834,461.24 175,722.48 833,617.89 175,466.86 832,405.24 175,370.42 831,947.72 175,518.96 832,652.39 175,770.92 833,847.67 175,892.16 834,422.83 175,624.01 994,136.51
4 Asphalt Liquid Mixer Unit/Jam 62,762.53 114,474.83 62,699.10 114,359.13 62,607.89 114,192.78 62,573.48 114,130.01 62,626.48 114,226.68 62,716.38 114,390.66 62,759.64 114,469.56 62,663.97 171,735.97
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 84,233.92 84,233.92 84,148.79 84,148.79 84,026.38 84,026.38 83,980.20 83,980.20 84,051.33 84,051.33 84,171.99 84,171.99 84,230.05 84,230.05 84,101.64 161,193.40
6 Asphalt Mixing Plant Unit/Jam 941,437.98 5,874,872.23 940,486.51 5,868,934.74 939,118.40 5,860,397.35 938,602.23 5,857,176.24 939,397.24 5,862,137.34 940,745.75 5,870,552.52 941,394.64 5,874,601.80 939,959.51 6,727,259.94
7 Asphalt Sprayer Unit/Jam 77,627.34 81,548.25 77,548.89 81,465.83 77,436.08 81,347.33 77,393.52 81,302.62 77,459.07 81,371.48 77,570.26 81,488.29 77,623.77 81,544.50 77,505.43 152,465.53
8 Asphalt Tanker Unit/Jam 363,362.03 420,745.20 362,994.79 420,319.97 362,466.75 419,708.54 362,267.53 419,477.85 362,574.37 419,833.15 363,094.85 420,435.83 363,345.30 420,725.83 362,791.39 752,637.14
9 Blending Equipment Unit/Jam 118,092.66 186,774.72 117,973.31 186,585.95 117,801.69 186,314.53 117,736.95 186,212.12 117,836.67 186,369.85 118,005.83 186,637.39 118,087.22 186,766.12 117,907.20 294,561.03
10 Bore Pile Machine Unit/Jam 325,374.18 565,344.98 325,045.34 564,773.61 324,572.50 563,952.05 324,394.10 563,642.08 324,668.87 564,119.49 325,134.94 564,929.29 325,359.20 565,318.96 324,863.20 862,242.97
11 Bore Pile Machine Dia 60 Unit/Jam 213,062.28 643,669.86 212,846.95 643,019.33 212,537.32 642,083.95 212,420.50 641,731.03 212,600.43 642,274.59 212,905.62 643,196.58 213,052.47 643,640.23 212,727.68 837,655.83
12 Bore Pile Machine Dia 80 Unit/Jam 842,339.24 842,339.24 841,487.93 841,487.93 840,263.84 840,263.84 839,801.99 839,801.99 840,513.32 840,513.32 841,719.88 841,719.88 842,300.47 842,300.47 841,016.41 1,611,934.02
13 Bulldozer 100-150 HP Unit/Jam 330,329.12 490,697.35 329,995.27 490,201.42 329,515.23 489,488.34 329,334.12 489,219.30 329,613.07 489,633.67 330,086.23 490,336.55 330,313.91 490,674.76 329,810.36 792,247.38
14 Cement Tanker Unit/Jam 307,206.08 396,645.23 306,895.60 396,244.36 306,449.16 395,667.95 306,280.73 395,450.48 306,540.15 395,785.43 306,980.19 396,353.59 307,191.94 396,626.98 306,723.63 677,180.52
15 Cold Milling Unit/Jam 479,803.04 1,398,828.16 479,318.12 1,397,414.43 478,620.87 1,395,381.64 478,357.80 1,394,614.69 478,762.98 1,395,795.94 479,450.25 1,397,799.63 479,780.95 1,398,763.77 479,049.54 1,835,752.12
16 Cold Recycler Unit/Jam 4,040,750.90 4,040,760.57 4,036,667.09 4,036,676.74 4,030,795.04 4,030,804.68 4,028,579.56 4,028,589.20 4,031,991.82 4,032,001.46 4,037,779.80 4,037,789.45 4,040,564.90 4,040,574.56 4,034,405.17 7,732,551.98
17 Compressor 4000-6500 L\M Unit/Jam 123,047.60 155,142.51 122,923.24 154,985.72 122,744.42 154,760.26 122,676.96 154,675.20 122,780.87 154,806.21 122,957.12 155,028.44 123,041.93 155,135.37 122,854.36 267,513.31
18 Concrete Breaker Unit/Jam 448,421.77 854,544.54 447,968.57 853,680.89 447,316.92 852,439.06 447,071.06 851,970.53 447,449.74 852,692.16 448,092.06 853,916.21 448,401.13 854,505.21 447,717.56 1,263,602.80
19 Concrete Mixer (350) Unit/Jam 83,408.10 83,408.10 83,323.80 83,323.80 83,202.60 83,202.60 83,156.86 83,156.86 83,227.30 83,227.30 83,346.77 83,346.77 83,404.26 83,404.26 83,277.11 159,613.07
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 94,969.62 94,969.62 94,873.64 94,873.64 94,735.63 94,735.63 94,683.56 94,683.56 94,763.76 94,763.76 94,899.79 94,899.79 94,965.25 94,965.25 94,820.48 181,737.66
21 Concrete Pan Mixer Unit/Jam 252,701.77 541,245.02 252,446.38 540,698.00 252,079.15 539,911.46 251,940.60 539,614.71 252,153.99 540,071.77 252,515.97 540,847.05 252,690.14 541,220.10 252,304.92 771,670.31
22 Concrete Pump Unit/Jam 192,416.71 246,266.48 192,222.24 246,017.59 191,942.62 245,659.72 191,837.12 245,524.69 191,999.61 245,732.65 192,275.23 246,085.41 192,407.85 246,255.15 192,114.53 421,981.51
23 Concrete Vibrator Unit/Jam 71,846.58 71,846.58 71,773.97 71,773.97 71,669.56 71,669.56 71,630.17 71,630.17 71,690.84 71,690.84 71,793.75 71,793.75 71,843.28 71,843.28 71,733.75 137,488.49
24 Crane 10-15 Ton Unit/Jam 257,656.71 383,300.88 257,396.31 382,913.50 257,021.88 382,356.48 256,880.61 382,146.32 257,098.19 382,470.01 257,467.26 383,019.05 257,644.85 383,283.24 257,252.08 618,509.03
25 Crane On Track 35 Ton Unit/Jam 213,888.10 445,793.09 213,671.93 445,342.55 213,361.11 444,694.72 213,243.84 444,450.30 213,424.46 444,826.75 213,730.83 445,465.31 213,878.26 445,772.57 213,552.21 640,845.62
26 Crane On Track 75-100 Ton Unit/Jam 336,109.87 509,111.73 335,770.18 508,597.19 335,281.75 507,857.35 335,097.46 507,578.21 335,381.29 508,008.14 335,862.74 508,737.39 336,094.40 509,088.30 335,582.04 815,923.45
27 Dump Truck 10 Ton Unit/Jam 317,941.77 352,244.06 317,620.44 351,888.07 317,158.41 351,376.18 316,984.09 351,183.05 317,252.58 351,480.51 317,708.00 351,985.06 317,927.14 352,227.85 317,442.47 642,674.50
28 Dump Truck 3-4 M3 Unit/Jam 173,422.79 258,975.20 173,247.51 258,713.46 172,995.50 258,337.12 172,900.41 258,195.12 173,046.86 258,413.82 173,295.27 258,784.78 173,414.80 258,963.28 173,150.44 417,286.83
29 Excavator 80-140 HP Unit/Jam 251,050.13 453,297.22 250,796.40 452,839.09 250,431.57 452,180.36 250,293.93 451,931.82 250,505.93 452,314.61 250,865.53 452,963.92 251,038.57 453,276.35 250,655.87 682,349.03
30 Flat Bed Truck 3-4 M3 Unit/Jam 304,728.61 406,686.89 304,420.63 406,275.86 303,977.80 405,684.87 303,810.72 405,461.88 304,068.05 405,805.32 304,504.55 406,387.86 304,714.58 406,668.17 304,250.05 684,939.00
31 Fulvi Mixer Unit/Jam 763,060.26 1,191,944.03 762,289.06 1,190,739.39 761,180.18 1,189,007.25 760,761.81 1,188,353.72 761,406.18 1,189,360.27 762,499.19 1,191,067.61 763,025.13 1,191,889.17 761,861.92 1,888,432.83
32 Generator Set Unit/Jam 339,413.17 548,989.14 339,070.14 548,434.30 338,576.90 547,636.50 338,390.80 547,335.50 338,677.42 547,799.10 339,163.60 548,585.47 339,397.54 548,963.87 338,880.14 858,761.44
33 Hot Recycler Unit/Jam 2,493,159.00 7,311,326.46 2,490,639.27 7,303,937.21 2,487,016.19 7,293,312.35 2,485,649.23 7,289,303.66 2,487,754.61 7,295,477.79 2,491,325.81 7,305,950.55 2,493,044.23 7,310,989.91 2,489,243.66 9,581,609.50
34 Jack Hammer Unit/Jam 47,071.90 47,071.90 47,024.33 47,024.33 46,955.92 46,955.92 46,930.11 46,930.11 46,969.86 46,969.86 47,037.29 47,037.29 47,069.73 47,069.73 46,997.98 90,078.67
35 Launching Gantry Unit/Jam 59,904,359.26 59,904,359.26 59,843,816.44 59,843,816.44 59,756,763.08 59,756,763.08 59,723,918.43 59,723,918.43 59,774,505.33 59,774,505.33 59,860,312.45 59,860,312.45 59,901,601.72 59,901,601.72 59,810,283.46 114,635,374.60
36 Motor Grader > 100 HP Unit/Jam 235,359.49 526,661.53 235,121.63 526,129.25 234,779.60 525,363.90 234,650.56 525,075.14 234,849.31 525,519.89 235,186.44 526,274.28 235,348.66 526,637.28 234,989.88 741,237.89
37 Pedestrian Roller Unit/Jam 77,627.34 77,627.34 77,548.89 77,548.89 77,436.08 77,436.08 77,393.52 77,393.52 77,459.07 77,459.07 77,570.26 77,570.26 77,623.77 77,623.77 77,505.43 148,550.78
38 Pile Driver + Hammer Unit/Jam 88,363.04 258,070.44 88,273.73 257,809.62 88,145.32 257,434.59 88,096.88 257,293.10 88,171.49 257,511.03 88,298.07 257,880.69 88,358.97 258,058.56 88,224.27 338,535.93
39 Rock Drill Breaker Unit/Jam 85,885.57 279,157.91 85,798.77 278,875.78 85,673.96 278,470.10 85,626.87 278,317.05 85,699.40 278,552.78 85,822.42 278,952.65 85,881.62 279,145.06 85,750.69 357,322.88
40 Split Form Paver Unit/Jam 181,681.01 181,681.01 181,497.40 181,497.40 181,233.38 181,233.38 181,133.76 181,133.76 181,287.19 181,287.19 181,547.43 181,547.43 181,672.65 181,672.65 181,395.70 347,672.04
41 Stone Crusher Unit/Jam 486,409.62 720,552.76 485,918.03 719,824.53 485,211.18 718,777.42 484,944.48 718,382.35 485,355.24 718,990.83 486,051.97 720,022.95 486,387.23 720,519.59 485,645.75 1,164,588.32
42 Tamper Unit/Jam 72,672.41 72,672.41 72,598.96 72,598.96 72,493.35 72,493.35 72,453.51 72,453.51 72,514.87 72,514.87 72,618.97 72,618.97 72,669.06 72,669.06 72,558.28 139,068.82
43 Tandem Roller 6-8 T Unit/Jam 350,974.69 350,974.69 350,619.97 350,619.97 350,109.93 350,109.93 349,917.50 349,917.50 350,213.88 350,213.88 350,716.62 350,716.62 350,958.53 350,958.53 350,423.50 671,639.18
44 Three Wheel Roller 6-8 T Unit/Jam 116,441.01 187,681.48 116,323.33 187,491.80 116,154.12 187,219.06 116,090.28 187,116.15 116,188.61 187,274.64 116,355.40 187,543.48 116,435.65 187,672.84 116,258.15 293,954.76
45 Tire Roller 8-10 T Unit/Jam 208,107.34 375,557.77 207,897.02 375,178.21 207,594.59 374,632.44 207,480.49 374,426.53 207,656.23 374,743.67 207,954.32 375,281.62 208,097.76 375,540.48 207,780.52 565,429.98
46 Track Loader 75-100 HP Unit/Jam 194,894.18 419,537.19 194,697.21 419,113.18 194,413.99 418,503.51 194,307.13 418,273.48 194,471.71 418,627.76 194,750.88 419,228.71 194,885.21 419,517.88 194,588.11 597,247.51
47 Trailer 20 Ton Unit/Jam 314,638.48 454,334.52 314,320.49 453,875.35 313,863.26 453,215.10 313,690.74 452,966.00 313,956.44 453,349.67 314,407.13 454,000.46 314,624.00 454,313.61 314,144.36 741,581.42
48 Trailler 15 Ton Unit/Jam 272,521.52 414,720.21 272,246.09 414,301.07 271,850.06 413,698.39 271,700.64 413,471.01 271,930.78 413,821.22 272,321.14 414,415.27 272,508.98 414,701.12 272,093.54 663,483.44
49 Truck Mixer (agitator) Unit/Jam 342,716.46 504,090.91 342,370.09 503,581.44 341,872.05 502,848.89 341,684.14 502,572.51 341,973.56 502,998.19 342,464.46 503,720.25 342,700.68 504,067.70 342,178.24 816,956.92
50 Vibrating Rammer Unit/Jam 70,194.94 70,194.94 70,123.99 70,123.99 70,021.99 70,021.99 69,983.50 69,983.50 70,042.78 70,042.78 70,143.32 70,143.32 70,191.71 70,191.71 70,084.70 134,327.84
51 Vibratory Roller 5-8 T Unit/Jam 169,293.67 363,507.78 169,122.57 363,140.40 168,876.56 362,612.15 168,783.73 362,412.85 168,926.70 362,719.81 169,169.19 363,240.50 169,285.88 363,491.05 169,027.81 517,876.24
52 Water Pump 70-100 MM Unit/Jam 52,852.66 52,852.66 52,799.24 52,799.24 52,722.44 52,722.44 52,693.46 52,693.46 52,738.09 52,738.09 52,813.80 52,813.80 52,850.23 52,850.23 52,769.66 101,140.96
53 Water Tanker 3000-4500 L Unit/Jam 191,590.89 225,434.07 191,397.25 225,206.24 191,118.83 224,878.63 191,013.79 224,755.03 191,175.58 224,945.40 191,450.01 225,268.31 191,582.07 225,423.69 191,290.01 400,426.01
54 Welding Set Unit/Jam 107,356.96 107,356.96 107,248.46 107,248.46 107,092.45 107,092.45 107,033.59 107,033.59 107,124.25 107,124.25 107,278.02 107,278.02 107,352.02 107,352.02 107,188.37 205,442.57
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 186,635.95 431,442.57 186,447.33 431,006.53 186,176.10 430,379.55 186,073.78 430,143.00 186,231.38 430,507.34 186,498.72 431,125.34 186,627.36 431,422.71 186,342.85 601,576.18
HARGA SATUAN DASAR BAHAN KABUPATEN PACITAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 260,078.77 260,078.77 259,815.92 259,815.92 259,437.98 259,437.98 259,295.38 259,295.38 259,515.00 259,515.00 259,887.54 259,887.54 260,066.80 260,066.80 259,670.34 497,697.13
2 Agregat Pecah Mesin 20-30 mm M3 251,041.29 251,041.29 250,787.57 250,787.57 250,422.76 250,422.76 250,285.11 250,285.11 250,497.11 250,497.11 250,856.70 250,856.70 251,029.73 251,029.73 250,647.04 480,402.64
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 543,815.78
4 Bahan Agr. Base Kelas A M3 272,128.76 272,128.76 271,853.73 271,853.73 271,458.27 271,458.27 271,309.06 271,309.06 271,538.87 271,538.87 271,928.66 271,928.66 272,116.23 272,116.23 271,701.40 520,756.46
5 Bahan Agr. Base Kelas B M3 256,062.11 256,062.11 255,803.32 255,803.32 255,431.21 255,431.21 255,290.82 255,290.82 255,507.05 255,507.05 255,873.83 255,873.83 256,050.33 256,050.33 255,659.98 490,010.69
6 Bahan Agr. Base Kelas C M3 234,974.65 234,974.65 234,737.17 234,737.17 234,395.70 234,395.70 234,266.87 234,266.87 234,465.29 234,465.29 234,801.87 234,801.87 234,963.83 234,963.83 234,605.63 449,656.87
7 Bahan Agr. Base Kelas C2 M3 214,891.34 214,891.34 214,674.16 214,674.16 214,361.88 214,361.88 214,244.06 214,244.06 214,425.52 214,425.52 214,733.34 214,733.34 214,881.45 214,881.45 214,553.87 411,224.66
8 Bahan Agr. Base Kelas S M3 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 332,438.62
9 Bahan Pilihan M3 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 332,438.62
10 Bahan Tanah Timbunan M3 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 190,239.44
11 Batu Belah/Kerakal M3 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
12 Batu Kali M3 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
13 Chipping M3 183,762.22 183,762.22 183,576.50 183,576.50 183,309.46 183,309.46 183,208.70 183,208.70 183,363.88 183,363.88 183,627.10 183,627.10 183,753.76 183,753.76 183,473.64 351,654.73
14 Chipping (kg) Kg 237.99 237.99 237.75 237.75 237.40 237.40 237.27 237.27 237.47 237.47 237.81 237.81 237.98 237.98 237.61 455.42
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 5,020.83 5,020.83 5,015.75 5,015.75 5,008.46 5,008.46 5,005.70 5,005.70 5,009.94 5,009.94 5,017.13 5,017.13 5,020.59 5,020.59 5,012.94 9,608.05
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 329,366.17 329,366.17 329,033.29 329,033.29 328,554.66 328,554.66 328,374.07 328,374.07 328,652.21 328,652.21 329,123.99 329,123.99 329,351.01 329,351.01 328,848.92 630,288.26
18 Kapur M3 82,341.54 82,341.54 82,258.32 82,258.32 82,138.66 82,138.66 82,093.52 82,093.52 82,163.05 82,163.05 82,281.00 82,281.00 82,337.75 82,337.75 82,212.23 157,572.06
19 Pasir Beton (Kasar) M3 392,628.57 392,628.57 392,231.76 392,231.76 391,661.19 391,661.19 391,445.92 391,445.92 391,777.48 391,777.48 392,339.88 392,339.88 392,610.50 392,610.50 392,011.98 751,349.72
20 Pasir Halus (untuk HRS) M3 248,028.79 248,028.79 247,778.12 247,778.12 247,417.68 247,417.68 247,281.69 247,281.69 247,491.14 247,491.14 247,846.42 247,846.42 248,017.37 248,017.37 247,639.28 474,637.80
21 Pasir Pasang (Sedang) M3 277,149.58 277,149.58 276,869.48 276,869.48 276,466.72 276,466.72 276,314.77 276,314.77 276,548.81 276,548.81 276,945.80 276,945.80 277,136.82 277,136.82 276,714.34 530,364.51
22 Pasir Urug M3 168,699.75 168,699.75 168,529.25 168,529.25 168,284.09 168,284.09 168,191.60 168,191.60 168,334.06 168,334.06 168,575.70 168,575.70 168,691.98 168,691.98 168,434.81 322,830.57
23 Pasir Urug (ada unsur lempung) M3 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
24 Sirtu M3 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 244,044.54
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 58,241.58 58,241.58 58,182.72 58,182.72 58,098.08 58,098.08 58,066.15 58,066.15 58,115.33 58,115.33 58,198.75 58,198.75 58,238.90 58,238.90 58,150.11 111,453.41
26 Anti Pengelupas Liter 83,345.71 83,345.71 83,261.47 83,261.47 83,140.36 83,140.36 83,094.66 83,094.66 83,165.04 83,165.04 83,284.42 83,284.42 83,341.87 83,341.87 83,214.82 159,493.67
27 Arbocell Kg 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 224,828.43
28 Asbuton Curah Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,535.40 8,535.40 8,526.78 8,526.78 8,514.37 8,514.37 8,509.69 8,509.69 8,516.90 8,516.90 8,529.13 8,529.13 8,535.01 8,535.01 8,522.00 16,333.69
30 Aspal Emulsi (CSS-1) Kg 8,535.40 8,535.40 8,526.78 8,526.78 8,514.37 8,514.37 8,509.69 8,509.69 8,516.90 8,516.90 8,529.13 8,529.13 8,535.01 8,535.01 8,522.00 16,333.69
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
33 Aspal Modifikasi (JAP-57) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
34 Aspal Modifikasi (Retona) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
35 Aspal Modifikasi (Starbit) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
36 Aspal Minyak (Curah) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
37 Assetilline Botol 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 245,966.15
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
40 Beton B-0 M3 487,235.45 487,235.45 486,743.02 486,743.02 486,034.96 486,034.96 485,767.82 485,767.82 486,179.27 486,179.27 486,877.19 486,877.19 487,213.02 487,213.02 486,470.27 932,393.21
41 Beton K-125 (fc' 10 MPa) M3 503,751.90 503,751.90 503,242.78 503,242.78 502,510.72 502,510.72 502,234.53 502,234.53 502,659.92 502,659.92 503,381.50 503,381.50 503,728.71 503,728.71 502,960.79 963,999.76
42 Beton K-175 (fc' 15 MPa) M3 545,043.04 545,043.04 544,492.19 544,492.19 543,700.13 543,700.13 543,401.29 543,401.29 543,861.56 543,861.56 544,642.28 544,642.28 545,017.95 545,017.95 544,187.09 1,043,016.13
43 Beton K-250 (fc' 20 MPa) M3 606,979.75 606,979.75 606,366.30 606,366.30 605,484.23 605,484.23 605,151.44 605,151.44 605,664.01 605,664.01 606,533.45 606,533.45 606,951.81 606,951.81 606,026.53 1,161,540.69
44 Beton K-300 (fc' 25 MPa) M3 631,754.43 631,754.43 631,115.95 631,115.95 630,197.88 630,197.88 629,851.50 629,851.50 630,384.99 630,384.99 631,289.91 631,289.91 631,725.35 631,725.35 630,762.31 1,208,950.52
45 Beton K-350 (fc' 30 MPa) M3 656,529.12 656,529.12 655,865.59 655,865.59 654,911.52 654,911.52 654,551.55 654,551.55 655,105.97 655,105.97 656,046.38 656,046.38 656,498.90 656,498.90 655,498.08 1,256,360.34
46 Beton K-400 (fc' 35 MPa) M3 681,303.80 681,303.80 680,615.24 680,615.24 679,625.16 679,625.16 679,251.61 679,251.61 679,826.95 679,826.95 680,802.85 680,802.85 681,272.44 681,272.44 680,233.86 1,303,770.17
47 Beton K-450 (fc' 40 MPa) M3 714,336.71 714,336.71 713,614.76 713,614.76 712,576.68 712,576.68 712,185.02 712,185.02 712,788.25 712,788.25 713,811.47 713,811.47 714,303.83 714,303.83 713,214.89 1,366,983.26
48 Beton K-500 (fc' 45 MPa) M3 743,240.51 743,240.51 742,489.35 742,489.35 741,409.27 741,409.27 741,001.76 741,001.76 741,629.40 741,629.40 742,694.02 742,694.02 743,206.30 743,206.30 742,073.30 1,422,294.73
49 Bunker Oil Liter 3,012.50 3,012.50 3,009.45 3,009.45 3,005.07 3,005.07 3,003.42 3,003.42 3,005.97 3,005.97 3,010.28 3,010.28 3,012.36 3,012.36 3,007.76 5,764.83
50 Cat Kg 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
51 Cat Anti Karat Kg 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
52 Cat Marka (Non Thermoplas) Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
53 Cat Marka (Thermoplastic) Kg 42,677.02 42,677.02 42,633.89 42,633.89 42,571.87 42,571.87 42,548.47 42,548.47 42,584.51 42,584.51 42,645.64 42,645.64 42,675.05 42,675.05 42,610.00 81,668.45
54 Cerucuk Diameter 10-15 cm M' 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
55 Cold Mix (Aspal Dingin) Kg 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,350,602.13 1,350,602.13 1,349,237.13 1,349,237.13 1,347,274.43 1,347,274.43 1,346,533.91 1,346,533.91 1,347,674.44 1,347,674.44 1,349,609.05 1,349,609.05 1,350,539.96 1,350,539.96 1,348,481.10 2,584,566.18
57 Curing Compound Liter 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 504,090.91 504,090.91 503,581.44 503,581.44 502,848.89 502,848.89 502,572.51 502,572.51 502,998.19 502,998.19 503,720.25 503,720.25 504,067.70 504,067.70 503,299.26 964,648.49
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 586,432.45 586,432.45 585,839.77 585,839.77 584,987.56 584,987.56 584,666.03 584,666.03 585,161.25 585,161.25 586,001.25 586,001.25 586,405.45 586,405.45 585,511.50 1,122,220.56
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 743,082.21 743,082.21 742,331.21 742,331.21 741,251.36 741,251.36 740,843.94 740,843.94 741,471.44 741,471.44 742,535.83 742,535.83 743,048.01 743,048.01 741,915.25 1,421,991.80
61 Kerosen/Minyak Tanah Liter 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
64 Oxygen (Isi 6 M3) Botol 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
65 Polytene 125 Mikron Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
66 Sand Sheet Ton 1,139,727.45 1,139,727.45 1,138,575.57 1,138,575.57 1,136,919.31 1,136,919.31 1,136,294.42 1,136,294.42 1,137,256.87 1,137,256.87 1,138,889.42 1,138,889.42 1,139,674.98 1,139,674.98 1,137,937.58 2,181,027.96
67 Seal Coat M2 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
68 Seal Guard Kg 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
69 Semen/PC (50 kg) Zak 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
70 Semen/PC (kg) Kg 1,154.79 1,154.79 1,153.62 1,153.62 1,151.94 1,151.94 1,151.31 1,151.31 1,152.29 1,152.29 1,153.94 1,153.94 1,154.74 1,154.74 1,152.98 2,209.85
71 Slurry Seal Ton 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
72 Solar Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
73 Thinner Liter 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
75 Baja Prategang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
77 Baja Tulangan (Polos) U25 Kg 10,593.94 10,593.94 10,583.24 10,583.24 10,567.84 10,567.84 10,562.03 10,562.03 10,570.98 10,570.98 10,586.15 10,586.15 10,593.45 10,593.45 10,577.31 20,272.99
78 Baja Tulangan (Polos) U32 Kg 10,593.94 10,593.94 10,583.24 10,583.24 10,567.84 10,567.84 10,562.03 10,562.03 10,570.98 10,570.98 10,586.15 10,586.15 10,593.45 10,593.45 10,577.31 20,272.99
79 Baja Tulangan (Polos) U36 Kg 10,593.94 10,593.94 10,583.24 10,583.24 10,567.84 10,567.84 10,562.03 10,562.03 10,570.98 10,570.98 10,586.15 10,586.15 10,593.45 10,593.45 10,577.31 20,272.99
80 Baja Tulangan (Ulir) D16 Kg 10,995.61 10,995.61 10,984.50 10,984.50 10,968.52 10,968.52 10,962.49 10,962.49 10,971.77 10,971.77 10,987.52 10,987.52 10,995.10 10,995.10 10,978.34 21,041.64
81 Baja Tulangan (Ulir) D19 Kg 10,995.61 10,995.61 10,984.50 10,984.50 10,968.52 10,968.52 10,962.49 10,962.49 10,971.77 10,971.77 10,987.52 10,987.52 10,995.10 10,995.10 10,978.34 21,041.64
82 Baja Tulangan (Ulir) D24 Kg 10,995.61 10,995.61 10,984.50 10,984.50 10,968.52 10,968.52 10,962.49 10,962.49 10,971.77 10,971.77 10,987.52 10,987.52 10,995.10 10,995.10 10,978.34 21,041.64
83 Baja Tulangan (Ulir) D32 Kg 10,995.61 10,995.61 10,984.50 10,984.50 10,968.52 10,968.52 10,962.49 10,962.49 10,971.77 10,971.77 10,987.52 10,987.52 10,995.10 10,995.10 10,978.34 21,041.64
84 Baja Tulangan (Ulir) D36 Kg 10,995.61 10,995.61 10,984.50 10,984.50 10,968.52 10,968.52 10,962.49 10,962.49 10,971.77 10,971.77 10,987.52 10,987.52 10,995.10 10,995.10 10,978.34 21,041.64
85 Besi Beton Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 10,735,529.63 10,735,529.63 10,724,679.68 10,724,679.68 10,709,078.75 10,709,078.75 10,703,192.62 10,703,192.62 10,712,258.35 10,712,258.35 10,727,635.95 10,727,635.95 10,735,035.45 10,735,035.45 10,718,670.19 20,543,938.30
87 Box Culvert Type DUB 200×200 M' 11,396,270.30 11,396,270.30 11,384,752.56 11,384,752.56 11,368,191.44 11,368,191.44 11,361,943.04 11,361,943.04 11,371,566.74 11,371,566.74 11,387,890.78 11,387,890.78 11,395,745.70 11,395,745.70 11,378,373.21 21,808,358.03
88 Box Culvert Type uk 300×200 M' 12,305,039.76 12,305,039.76 12,292,603.57 12,292,603.57 12,274,721.82 12,274,721.82 12,267,975.15 12,267,975.15 12,278,366.28 12,278,366.28 12,295,992.04 12,295,992.04 12,304,473.33 12,304,473.33 12,285,715.51 23,547,415.57
89 Casing M2 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
90 Ducting (Kabel Prestress) M' 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
91 Ducting (Strand Prestress) M' 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
92 Expansion Cap M2 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
93 Expansion Join Baja Siku M' 1,797,455.62 1,797,455.62 1,795,639.01 1,795,639.01 1,793,026.93 1,793,026.93 1,792,041.42 1,792,041.42 1,793,559.30 1,793,559.30 1,796,133.98 1,796,133.98 1,797,372.88 1,797,372.88 1,794,632.84 3,439,682.87
94 Expansion Join Tipe Rubber M' 1,301,398.04 1,301,398.04 1,300,082.77 1,300,082.77 1,298,191.57 1,298,191.57 1,297,478.03 1,297,478.03 1,298,577.01 1,298,577.01 1,300,441.14 1,300,441.14 1,301,338.13 1,301,338.13 1,299,354.28 2,490,407.26
95 Expansion Join Tipe Torma M' 1,492,189.41 1,492,189.41 1,490,681.32 1,490,681.32 1,488,512.86 1,488,512.86 1,487,694.72 1,487,694.72 1,488,954.81 1,488,954.81 1,491,092.23 1,491,092.23 1,492,120.73 1,492,120.73 1,489,846.03 2,855,513.26
96 Expansion Tipe Joint Asphaltic Plug M' 1,770,343.16 1,770,343.16 1,768,553.95 1,768,553.95 1,765,981.28 1,765,981.28 1,765,010.62 1,765,010.62 1,766,505.61 1,766,505.61 1,769,041.45 1,769,041.45 1,770,261.67 1,770,261.67 1,767,562.96 3,387,799.38
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
99 Glass Bead Kg 58,241.58 58,241.58 58,182.72 58,182.72 58,098.08 58,098.08 58,066.15 58,066.15 58,115.33 58,115.33 58,198.75 58,198.75 58,238.90 58,238.90 58,150.11 111,453.41
100 Joint Sealent Kg 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
101 Joint Socket Pile 16×16×16 Set 75,312.39 75,312.39 75,236.27 75,236.27 75,126.83 75,126.83 75,085.53 75,085.53 75,149.13 75,149.13 75,257.01 75,257.01 75,308.92 75,308.92 75,194.11 144,120.79
102 Joint Socket Pile 35×35 Set 645,678.19 645,678.19 645,025.63 645,025.63 644,087.33 644,087.33 643,733.31 643,733.31 644,278.56 644,278.56 645,203.43 645,203.43 645,648.47 645,648.47 644,664.20 1,235,595.58
103 Kawat Beton Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
104 Kawat Bronjong Kg 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
105 Kawat Las Dos 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 284,398.36
106 Kayu Acuan (Kelas III/Meranti) M3 3,550,727.97 3,550,727.97 3,547,139.40 3,547,139.40 3,541,979.46 3,541,979.46 3,540,032.65 3,540,032.65 3,543,031.10 3,543,031.10 3,548,117.17 3,548,117.17 3,550,564.52 3,550,564.52 3,545,151.79 6,794,814.87
107 Kayu Perancah (Gelam) M3 2,287,488.21 2,287,488.21 2,285,176.35 2,285,176.35 2,281,852.15 2,281,852.15 2,280,597.96 2,280,597.96 2,282,529.65 2,282,529.65 2,285,806.26 2,285,806.26 2,287,382.91 2,287,382.91 2,283,895.87 4,377,428.81
108 Kerb Pracetak Type 1 (Peninggi) Buah 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 78,324.88 78,324.88 78,245.72 78,245.72 78,131.90 78,131.90 78,088.96 78,088.96 78,155.10 78,155.10 78,267.29 78,267.29 78,321.28 78,321.28 78,201.88 149,885.62
110 Marmer Nama Jembatan Buah 495,053.42 495,053.42 494,553.09 494,553.09 493,833.68 493,833.68 493,562.24 493,562.24 493,980.30 493,980.30 494,689.41 494,689.41 495,030.63 495,030.63 494,275.97 947,354.00
111 Mata Kucing Buah 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
112 Matras Concrete (Tebal=10 cm) M2 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 232,514.88
113 Mini Pile 16×16×16 M' 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 215,220.38
114 Mini Timber Pile Buah 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
115 Multipleks 12 mm Lbr 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
116 Paku Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
117 Paving Block (Model Bata 8 cm) M2 78,324.88 78,324.88 78,245.72 78,245.72 78,131.90 78,131.90 78,088.96 78,088.96 78,155.10 78,155.10 78,267.29 78,267.29 78,321.28 78,321.28 78,201.88 149,885.62
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 54,899,717.12 54,899,717.12 54,844,232.29 54,844,232.29 54,764,451.70 54,764,451.70 54,734,351.02 54,734,351.02 54,780,711.69 54,780,711.69 54,859,350.16 54,859,350.16 54,897,189.96 54,897,189.96 54,813,500.78 105,058,291.52
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 77,773,595.09 77,773,595.09 77,694,992.59 77,694,992.59 77,581,971.56 77,581,971.56 77,539,329.47 77,539,329.47 77,605,006.25 77,605,006.25 77,716,409.30 77,716,409.30 77,770,014.99 77,770,014.99 77,651,456.85 148,830,658.04
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 148,648,575.60 148,648,575.60 148,498,342.73 148,498,342.73 148,282,325.77 148,282,325.77 148,200,824.01 148,200,824.01 148,326,351.95 148,326,351.95 148,539,276.46 148,539,276.46 148,641,732.95 148,641,732.95 148,415,132.94 284,459,851.66
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 194,928,539.07 194,928,539.07 194,731,532.99 194,731,532.99 194,448,261.72 194,448,261.72 194,341,385.36 194,341,385.36 194,505,994.92 194,505,994.92 194,785,210.94 194,785,210.94 194,919,566.05 194,919,566.05 194,622,416.81 373,023,038.29
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 248,482,674.90 248,482,674.90 248,231,543.90 248,231,543.90 247,870,447.45 247,870,447.45 247,734,208.17 247,734,208.17 247,944,042.11 247,944,042.11 248,299,969.18 248,299,969.18 248,471,236.64 248,471,236.64 248,092,449.44 475,506,371.68
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 299,793,505.77 299,793,505.77 299,490,517.07 299,490,517.07 299,054,855.43 299,054,855.43 298,890,483.20 298,890,483.20 299,143,647.14 299,143,647.14 299,573,071.95 299,573,071.95 299,779,705.56 299,779,705.56 299,322,700.08 573,696,827.12
124 Pelat Rambu (Eng. Grade) Buah 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 332,438.62
125 Pelat Rambu (High L Grade) Buah 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
126 Pemantul Cahaya (Reflector) Buah 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
127 Pipa Baja D10" Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
128 Pipa Drainase Baja Dia 3" M' 226,941.32 226,941.32 226,711.96 226,711.96 226,382.17 226,382.17 226,257.74 226,257.74 226,449.39 226,449.39 226,774.46 226,774.46 226,930.88 226,930.88 226,584.93 434,283.98
129 Pipa Galvanis Dia 1,5" M' 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
130 Pipa Galvanis Dia 2" M' 260,078.77 260,078.77 259,815.92 259,815.92 259,437.98 259,437.98 259,295.38 259,295.38 259,515.00 259,515.00 259,887.54 259,887.54 260,066.80 260,066.80 259,670.34 497,697.13
131 Pipa Galvanis Dia 3" M' 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
132 Pipa Porus M' 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
133 Pipa PVC Dia 4" M' 98,408.18 98,408.18 98,308.73 98,308.73 98,165.72 98,165.72 98,111.76 98,111.76 98,194.87 98,194.87 98,335.83 98,335.83 98,403.65 98,403.65 98,253.64 188,317.83
134 Plastik Filter M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
135 Rel Pengaman M' 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,696,034.94 1,696,034.94 1,694,320.83 1,694,320.83 1,691,856.14 1,691,856.14 1,690,926.23 1,690,926.23 1,692,358.47 1,692,358.47 1,694,787.87 1,694,787.87 1,695,956.87 1,695,956.87 1,693,371.43 3,245,600.20
137 Strip Bearing Buah 260,078.77 260,078.77 259,815.92 259,815.92 259,437.98 259,437.98 259,295.38 259,295.38 259,515.00 259,515.00 259,887.54 259,887.54 260,066.80 260,066.80 259,670.34 497,697.13
138 Tiang Pancang Baja Diameter 400 M' 601,494.93 601,494.93 600,887.02 600,887.02 600,012.92 600,012.92 599,683.13 599,683.13 600,191.07 600,191.07 601,052.65 601,052.65 601,467.24 601,467.24 600,550.32 1,151,044.71
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 734,044.73 734,044.73 733,302.86 733,302.86 732,236.14 732,236.14 731,833.67 731,833.67 732,453.55 732,453.55 733,504.99 733,504.99 734,010.94 734,010.94 732,891.96 1,404,697.31
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,536,372.68 1,536,372.68 1,534,819.93 1,534,819.93 1,532,587.27 1,532,587.27 1,531,744.90 1,531,744.90 1,533,042.30 1,533,042.30 1,535,243.01 1,535,243.01 1,536,301.96 1,536,301.96 1,533,959.91 2,940,064.13
HARGA SATUAN DASAR UPAH KABUPATEN PONOROGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
2 Tukang OH 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
3 Mandor OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
4 Operator OH 298,000 298,000 298,806.28 298,806.28 299,218.22 299,218.22 299,226.55 299,226.55 298,831.34 298,831.34 298,404.49 298,404.49 298,339.89 298,339.89 298,690.12 298,690.12 299,124.52 299,124.52
5 Pembantu Operator OH 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
6 Sopir OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
7 Pembantu Sopir OH 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
8 Mekanik OH 167,000 167,000 167,451.84 167,451.84 167,682.69 167,682.69 167,687.36 167,687.36 167,465.89 167,465.89 167,226.68 167,226.68 167,190.48 167,190.48 167,386.75 167,386.75 167,630.18 167,630.18
9 Pembantu Mekanik OH 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
10 Kepala Tukang OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
11 Pemasak Aspal OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52

HARGA SATUAN DASAR ALAT KABUPATEN PONOROGO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 437,925 489,000 439,110.25 490,323.06 439,715.60 490,999.02 439,727.84 491,012.69 439,147.07 490,364.18 438,519.79 489,663.74 438,424.86 489,557.74 438,939.54 490,132.45 439,577.91 490,845.26
2 Asphalt Distribution Unit/Jam 269,636 347,000 270,365.12 347,938.86 270,737.84 348,418.53 270,745.38 348,428.23 270,387.79 347,968.04 270,001.57 347,471.00 269,943.12 347,395.78 270,260.01 347,803.60 270,653.06 348,309.42
3 Asphalt Finisher Unit/Jam 198,043 939,000 198,578.52 941,540.61 198,852.28 942,838.61 198,857.81 942,864.85 198,595.17 941,619.56 198,311.50 940,274.54 198,268.57 940,071.00 198,501.32 941,174.57 198,790.01 942,543.36
4 Asphalt Liquid Mixer Unit/Jam 70,663 129,000 70,854.31 129,349.03 70,951.99 129,527.35 70,953.96 129,530.95 70,860.25 129,359.88 70,759.03 129,175.10 70,743.71 129,147.13 70,826.76 129,298.74 70,929.77 129,486.79
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 94,837 95,000 95,093.94 95,257.04 95,225.03 95,388.36 95,227.69 95,391.01 95,101.91 95,265.03 94,966.07 95,128.95 94,945.51 95,108.35 95,056.97 95,220.00 95,195.22 95,358.49
6 Asphalt Mixing Plant Unit/Jam 1,059,947 1,476,000 1,062,814.62 1,479,993.54 1,064,279.80 1,482,033.85 1,064,309.43 1,482,075.10 1,062,903.74 1,480,117.65 1,061,385.48 1,478,003.43 1,061,155.72 1,477,683.48 1,062,401.44 1,479,418.18 1,063,946.53 1,481,569.76
7 Asphalt Sprayer Unit/Jam 87,399 87,399 87,635.59 87,635.59 87,756.40 87,756.40 87,758.85 87,758.85 87,642.94 87,642.94 87,517.75 87,517.75 87,498.80 87,498.80 87,601.52 87,601.52 87,728.92 87,728.92
8 Asphalt Tanker Unit/Jam 409,102 474,000 410,209.15 475,282.48 410,774.66 475,937.70 410,786.10 475,950.95 410,243.55 475,322.34 409,657.55 474,643.38 409,568.87 474,540.63 410,049.68 475,097.71 410,646.03 475,788.66
9 Blending Equipment Unit/Jam 132,958 210,000 133,317.97 210,568.19 133,501.76 210,858.47 133,505.48 210,864.34 133,329.15 210,585.85 133,138.70 210,285.04 133,109.88 210,239.52 133,266.15 210,486.33 133,459.96 210,792.44
10 Bore Pile Machine Unit/Jam 366,332 637,000 367,323.65 638,723.50 367,830.04 639,604.04 367,840.28 639,621.84 367,354.45 638,777.06 366,829.72 637,864.63 366,750.31 637,726.54 367,180.85 638,475.19 367,714.85 639,403.75
11 Bore Pile Machine Dia 60 Unit/Jam 239,883 725,000 240,531.73 726,961.60 240,863.32 727,963.78 240,870.03 727,984.04 240,551.90 727,022.56 240,208.29 725,984.07 240,156.29 725,826.92 240,438.22 726,678.98 240,787.90 727,735.82
12 Bore Pile Machine Dia 80 Unit/Jam 948,373 948,373 950,939.40 950,939.40 952,250.35 952,250.35 952,276.86 952,276.86 951,019.14 951,019.14 949,660.69 949,660.69 949,455.11 949,455.11 950,569.71 950,569.71 951,952.16 951,952.16
13 Bulldozer 100-150 HP Unit/Jam 372,000 539,000 373,006.50 540,458.35 373,520.73 541,203.42 373,531.12 541,218.48 373,037.78 540,503.67 372,504.93 539,731.61 372,424.29 539,614.77 372,861.49 540,248.24 373,403.76 541,033.94
14 Cement Tanker Unit/Jam 346,000 446,000 346,936.16 447,206.72 347,414.44 447,823.24 347,424.11 447,835.70 346,965.25 447,244.22 346,469.64 446,605.37 346,394.64 446,508.70 346,801.28 447,032.86 347,305.65 447,683.00
15 Cold Milling Unit/Jam 540,000 1,149,000 541,461.05 1,152,108.80 542,207.50 1,153,697.08 542,222.60 1,153,729.20 541,506.46 1,152,205.41 540,732.96 1,150,559.58 540,615.91 1,150,310.52 541,250.55 1,151,660.90 542,037.72 1,153,335.81
16 Cold Recycler Unit/Jam 4,550,000 4,550,000 4,562,310.72 4,562,310.72 4,568,600.27 4,568,600.27 4,568,727.45 4,568,727.45 4,562,693.31 4,562,693.31 4,556,175.90 4,556,175.90 4,555,189.60 4,555,189.60 4,560,537.07 4,560,537.07 4,567,169.64 4,567,169.64
17 Compressor 4000-6500 L\M Unit/Jam 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
18 Concrete Breaker Unit/Jam 505,000 962,000 506,366.35 964,602.84 507,064.43 965,932.63 507,078.54 965,959.52 506,408.82 964,683.73 505,685.46 963,305.76 505,575.99 963,097.23 506,169.50 964,227.84 506,905.64 965,630.15
19 Concrete Mixer (350) Unit/Jam 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
21 Concrete Pan Mixer Unit/Jam 285,000 609,000 285,771.11 610,647.74 286,165.07 611,489.57 286,173.04 611,506.60 285,795.08 610,698.95 285,386.84 609,826.62 285,325.06 609,694.61 285,660.01 610,410.35 286,075.46 611,298.09
22 Concrete Pump Unit/Jam 216,000 232,000 216,584.42 232,627.71 216,883.00 232,948.41 216,889.04 232,954.89 216,602.58 232,647.22 216,293.19 232,314.90 216,246.36 232,264.61 216,500.22 232,537.27 216,815.09 232,875.46
23 Concrete Vibrator Unit/Jam 81,000 81,000 81,219.16 81,219.16 81,331.13 81,331.13 81,333.39 81,333.39 81,225.97 81,225.97 81,109.94 81,109.94 81,092.39 81,092.39 81,187.58 81,187.58 81,305.66 81,305.66
24 Crane 10-15 Ton Unit/Jam 290,000 290,000 290,784.64 290,784.64 291,185.51 291,185.51 291,193.62 291,193.62 290,809.02 290,809.02 290,393.63 290,393.63 290,330.77 290,330.77 290,671.59 290,671.59 291,094.33 291,094.33
25 Crane On Track 35 Ton Unit/Jam 240,000 457,000 240,649.36 458,236.48 240,981.11 458,868.20 240,987.82 458,880.98 240,669.54 458,274.91 240,325.76 457,620.30 240,273.74 457,521.24 240,555.80 458,058.34 240,905.65 458,724.51
26 Crane On Track 75-100 Ton Unit/Jam 378,000 574,000 379,022.74 575,553.04 379,545.25 576,346.50 379,555.82 576,362.54 379,054.52 575,601.31 378,513.07 574,779.11 378,431.14 574,654.69 378,875.39 575,329.29 379,426.40 576,166.02
27 Dump Truck 10 Ton Unit/Jam 357,964 385,000 358,933.01 386,041.68 359,427.83 386,573.87 359,437.83 386,584.63 358,963.11 386,074.05 358,450.36 385,522.58 358,372.76 385,439.12 358,793.47 385,891.60 359,315.28 386,452.82
28 Dump Truck 3-4 M3 Unit/Jam 195,253 256,000 195,781.64 256,692.65 196,051.54 257,046.52 196,057.00 257,053.68 195,798.06 256,714.17 195,518.38 256,347.48 195,476.05 256,291.99 195,705.53 256,592.85 195,990.15 256,966.03
29 Excavator 80-140 HP Unit/Jam 282,652 449,000 283,417.23 450,214.84 283,807.95 450,835.50 283,815.85 450,848.05 283,441.00 450,252.59 283,036.13 449,609.45 282,974.86 449,512.12 283,307.05 450,039.81 283,719.07 450,694.32
30 Flat Bed Truck 3-4 M3 Unit/Jam 343,088 458,000 344,016.31 459,239.19 344,490.57 459,872.29 344,500.16 459,885.09 344,045.16 459,277.70 343,553.72 458,621.66 343,479.35 458,522.38 343,882.57 459,060.65 344,382.69 459,728.28
31 Fulvi Mixer Unit/Jam 859,115 1,342,000 861,439.22 1,345,630.99 862,626.79 1,347,486.06 862,650.80 1,347,523.57 861,511.46 1,345,743.83 860,280.86 1,343,821.55 860,094.63 1,343,530.65 861,104.32 1,345,107.86 862,356.66 1,347,064.10
32 Generator Set Unit/Jam 382,139 405,000 383,172.64 406,095.79 383,700.88 406,655.63 383,711.56 406,666.95 383,204.77 406,129.84 382,657.40 405,549.72 382,574.56 405,461.93 383,023.68 405,937.91 383,580.72 406,528.29
33 Hot Recycler Unit/Jam 2,806,999 8,231,000 2,814,594.15 8,253,270.23 2,818,474.32 8,264,648.10 2,818,552.78 8,264,878.16 2,814,830.18 8,253,962.34 2,810,809.44 8,242,172.27 2,810,200.97 8,240,388.05 2,813,499.95 8,250,061.67 2,817,591.73 8,262,060.07
34 Jack Hammer Unit/Jam 52,997 52,997 53,140.73 53,140.73 53,213.99 53,213.99 53,215.47 53,215.47 53,145.19 53,145.19 53,069.27 53,069.27 53,057.79 53,057.79 53,120.07 53,120.07 53,197.33 53,197.33
35 Launching Gantry Unit/Jam 67,445,157 67,446,000 67,627,640.03 67,628,485.49 67,720,870.72 67,721,717.34 67,722,755.90 67,723,602.55 67,633,311.19 67,634,156.72 67,536,702.88 67,537,547.20 67,522,082.91 67,522,927.05 67,601,348.98 67,602,194.11 67,699,664.30 67,700,510.66
36 Motor Grader > 100 HP Unit/Jam 264,987 445,000 265,703.65 446,204.02 266,069.95 446,819.15 266,077.36 446,831.59 265,725.94 446,241.43 265,346.37 445,604.02 265,288.93 445,507.55 265,600.36 446,030.55 265,986.63 446,679.23
37 Pedestrian Roller Unit/Jam 87,399 87,399 87,635.59 87,635.59 87,756.40 87,756.40 87,758.85 87,758.85 87,642.94 87,642.94 87,517.75 87,517.75 87,498.80 87,498.80 87,601.52 87,601.52 87,728.92 87,728.92
38 Pile Driver + Hammer Unit/Jam 99,486 291,000 99,755.41 291,787.35 99,892.93 292,189.60 99,895.71 292,197.73 99,763.77 291,811.81 99,621.27 291,394.99 99,599.70 291,331.91 99,716.63 291,673.91 99,861.65 292,098.10
39 Rock Drill Breaker Unit/Jam 96,697 314,000 96,958.53 314,849.58 97,092.19 315,283.62 97,094.90 315,292.40 96,966.66 314,875.98 96,828.15 314,426.20 96,807.19 314,358.14 96,920.83 314,727.17 97,061.79 315,184.89
40 Split Form Paver Unit/Jam 204,551 204,551 205,104.58 205,104.58 205,387.33 205,387.33 205,393.05 205,393.05 205,121.78 205,121.78 204,828.78 204,828.78 204,784.44 204,784.44 205,024.84 205,024.84 205,323.01 205,323.01
41 Stone Crusher Unit/Jam 547,639 682,000 549,120.89 683,845.26 549,877.90 684,788.00 549,893.21 684,807.06 549,166.93 683,902.60 548,382.50 682,925.71 548,263.79 682,777.87 548,907.41 683,579.40 549,705.71 684,573.56
42 Tamper Unit/Jam 81,820 81,820 82,041.83 82,041.83 82,154.93 82,154.93 82,157.22 82,157.22 82,048.71 82,048.71 81,931.51 81,931.51 81,913.77 81,913.77 82,009.94 82,009.94 82,129.21 82,129.21
43 Tandem Roller 6-8 T Unit/Jam 395,000 461,000 396,068.73 462,247.31 396,614.75 462,884.55 396,625.79 462,897.44 396,101.95 462,286.07 395,536.15 461,625.73 395,450.53 461,525.80 395,914.76 462,067.60 396,490.55 462,739.61
44 Three Wheel Roller 6-8 T Unit/Jam 131,000 166,000 131,354.44 166,449.14 131,535.52 166,678.60 131,539.19 166,683.24 131,365.46 166,463.10 131,177.81 166,225.32 131,149.41 166,189.34 131,303.37 166,384.43 131,494.33 166,626.41
45 Tire Roller 8-10 T Unit/Jam 234,000 423,000 234,633.12 424,144.49 234,956.59 424,729.21 234,963.13 424,741.04 234,652.80 424,180.06 234,317.62 423,574.16 234,266.89 423,482.46 234,541.91 423,979.60 234,883.01 424,596.21
46 Track Loader 75-100 HP Unit/Jam 220,000 289,000 220,595.24 289,781.93 220,899.35 290,181.42 220,905.50 290,189.50 220,613.74 289,806.23 220,298.61 289,392.27 220,250.93 289,329.63 220,509.48 289,669.28 220,830.18 290,090.56
47 Trailer 20 Ton Unit/Jam 354,245 490,000 355,203.83 491,325.77 355,693.51 492,003.11 355,703.41 492,016.80 355,233.62 491,366.97 354,726.20 490,665.10 354,649.41 490,558.88 355,065.74 491,134.76 355,582.13 491,849.04
48 Trailler 15 Ton Unit/Jam 306,827 467,000 307,656.86 468,263.54 308,081.00 468,909.08 308,089.57 468,922.14 307,682.66 468,302.81 307,243.17 467,633.88 307,176.65 467,532.65 307,537.26 468,081.50 307,984.52 468,762.25
49 Truck Mixer (agitator) Unit/Jam 385,858 567,000 386,901.81 568,534.11 387,435.19 569,317.88 387,445.98 569,333.73 386,934.26 568,581.78 386,381.56 567,769.61 386,297.91 567,646.70 386,751.40 568,313.08 387,313.87 569,139.60
50 Vibrating Rammer Unit/Jam 79,031 79,031 79,244.95 79,244.95 79,354.20 79,354.20 79,356.40 79,356.40 79,251.60 79,251.60 79,138.39 79,138.39 79,121.26 79,121.26 79,214.14 79,214.14 79,329.35 79,329.35
51 Vibratory Roller 5-8 T Unit/Jam 190,604 409,000 191,120.17 410,106.61 191,383.65 410,671.98 191,388.98 410,683.41 191,136.20 410,141.00 190,863.18 409,555.15 190,821.86 409,466.49 191,045.87 409,947.18 191,323.72 410,543.38
52 Water Pump 70-100 MM Unit/Jam 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
53 Water Tanker 3000-4500 L Unit/Jam 215,000 215,000 215,581.72 215,581.72 215,878.91 215,878.91 215,884.92 215,884.92 215,599.79 215,599.79 215,291.83 215,291.83 215,245.22 215,245.22 215,497.91 215,497.91 215,811.31 215,811.31
54 Welding Set Unit/Jam 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 210,000 335,000 210,568.19 335,906.39 210,858.47 336,369.47 210,864.34 336,378.83 210,585.85 335,934.56 210,285.04 335,454.71 210,239.52 335,382.09 210,486.33 335,775.81 210,792.44 336,264.14
HARGA SATUAN DASAR BAHAN KABUPATEN PONOROGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 293,000 293,000 293,792.76 293,792.76 294,197.78 294,197.78 294,205.97 294,205.97 293,817.39 293,817.39 293,397.70 293,397.70 293,334.19 293,334.19 293,678.54 293,678.54 294,105.65 294,105.65
2 Agregat Pecah Mesin 20-30 mm M3 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 320,000 320,000 320,865.81 320,865.81 321,308.15 321,308.15 321,317.10 321,317.10 320,892.72 320,892.72 320,434.35 320,434.35 320,364.98 320,364.98 320,741.07 320,741.07 321,207.54 321,207.54
4 Bahan Agr. Base Kelas A M3 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
5 Bahan Agr. Base Kelas B M3 288,000 288,000 288,779.23 288,779.23 289,177.34 289,177.34 289,185.39 289,185.39 288,803.44 288,803.44 288,390.91 288,390.91 288,328.48 288,328.48 288,666.96 288,666.96 289,086.78 289,086.78
6 Bahan Agr. Base Kelas C M3 265,000 265,000 265,717.00 265,717.00 266,083.31 266,083.31 266,090.72 266,090.72 265,739.28 265,739.28 265,359.70 265,359.70 265,302.25 265,302.25 265,613.70 265,613.70 265,999.99 265,999.99
7 Bahan Agr. Base Kelas C2 M3 242,000 242,000 242,654.77 242,654.77 242,989.29 242,989.29 242,996.05 242,996.05 242,675.12 242,675.12 242,328.48 242,328.48 242,276.02 242,276.02 242,560.43 242,560.43 242,913.20 242,913.20
8 Bahan Agr. Base Kelas S M3 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
9 Bahan Pilihan M3 195,000 195,000 195,527.60 195,527.60 195,797.15 195,797.15 195,802.60 195,802.60 195,544.00 195,544.00 195,264.68 195,264.68 195,222.41 195,222.41 195,451.59 195,451.59 195,735.84 195,735.84
10 Bahan Tanah Timbunan M3 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
11 Batu Belah/Kerakal M3 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28 315,729.49 315,729.49 316,188.67 316,188.67
12 Batu Kali M3 347,000 347,000 347,938.86 347,938.86 348,418.53 348,418.53 348,428.23 348,428.23 347,968.04 347,968.04 347,471.00 347,471.00 347,395.78 347,395.78 347,803.60 347,803.60 348,309.42 348,309.42
13 Chipping M3 207,000 207,000 207,560.07 207,560.07 207,846.21 207,846.21 207,852.00 207,852.00 207,577.48 207,577.48 207,280.97 207,280.97 207,236.10 207,236.10 207,479.38 207,479.38 207,781.12 207,781.12
14 Chipping (kg) Kg 268 268 268.73 268.73 269.10 269.10 269.10 269.10 268.75 268.75 268.36 268.36 268.31 268.31 268.62 268.62 269.01 269.01
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 371,000 371,000 372,003.80 372,003.80 372,516.64 372,516.64 372,527.01 372,527.01 372,034.99 372,034.99 371,503.57 371,503.57 371,423.15 371,423.15 371,859.18 371,859.18 372,399.99 372,399.99
18 Kapur M3 93,000 93,000 93,251.63 93,251.63 93,380.18 93,380.18 93,382.78 93,382.78 93,259.45 93,259.45 93,126.23 93,126.23 93,106.07 93,106.07 93,215.37 93,215.37 93,350.94 93,350.94
19 Pasir Beton (Kasar) M3 442,000 442,000 443,195.90 443,195.90 443,806.88 443,806.88 443,819.24 443,819.24 443,233.06 443,233.06 442,599.94 442,599.94 442,504.13 442,504.13 443,023.60 443,023.60 443,667.91 443,667.91
20 Pasir Halus (untuk HRS) M3 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
21 Pasir Pasang (Sedang) M3 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
22 Pasir Urug M3 190,000 190,000 190,514.07 190,514.07 190,776.71 190,776.71 190,782.03 190,782.03 190,530.05 190,530.05 190,257.89 190,257.89 190,216.71 190,216.71 190,440.01 190,440.01 190,716.97 190,716.97
23 Pasir Urug (ada unsur lempung) M3 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
24 Sirtu M3 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
26 Anti Pengelupas Liter 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
27 Arbocell Kg 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 548,569 548,569 550,053.18 550,053.18 550,811.48 550,811.48 550,826.81 550,826.81 550,099.31 550,099.31 549,313.54 549,313.54 549,194.63 549,194.63 549,839.34 549,839.34 550,638.99 550,638.99
41 Beton K-125 (fc' 10 MPa) M3 567,164 567,164 568,699.05 568,699.05 569,483.05 569,483.05 569,498.91 569,498.91 568,746.74 568,746.74 567,934.34 567,934.34 567,811.39 567,811.39 568,477.96 568,477.96 569,304.72 569,304.72
42 Beton K-175 (fc' 15 MPa) M3 613,653 613,653 615,313.73 615,313.73 616,161.99 616,161.99 616,179.14 616,179.14 615,365.33 615,365.33 614,486.33 614,486.33 614,353.31 614,353.31 615,074.52 615,074.52 615,969.04 615,969.04
43 Beton K-250 (fc' 20 MPa) M3 683,387 683,387 685,235.74 685,235.74 686,180.40 686,180.40 686,199.50 686,199.50 685,293.20 685,293.20 684,314.32 684,314.32 684,166.19 684,166.19 684,969.35 684,969.35 685,965.53 685,965.53
44 Beton K-300 (fc' 25 MPa) M3 711,280 711,280 713,204.55 713,204.55 714,187.76 714,187.76 714,207.64 714,207.64 713,264.36 713,264.36 712,245.52 712,245.52 712,091.34 712,091.34 712,927.28 712,927.28 713,964.12 713,964.12
45 Beton K-350 (fc' 30 MPa) M3 739,173 739,173 741,173.35 741,173.35 742,195.13 742,195.13 742,215.79 742,215.79 741,235.51 741,235.51 740,176.72 740,176.72 740,016.49 740,016.49 740,885.21 740,885.21 741,962.71 741,962.71
46 Beton K-400 (fc' 35 MPa) M3 767,067 767,067 769,142.16 769,142.16 770,202.49 770,202.49 770,223.93 770,223.93 769,206.66 769,206.66 768,107.91 768,107.91 767,941.64 767,941.64 768,843.15 768,843.15 769,961.30 769,961.30
47 Beton K-450 (fc' 40 MPa) M3 804,258 804,258 806,433.90 806,433.90 807,545.64 807,545.64 807,568.12 807,568.12 806,501.53 806,501.53 805,349.51 805,349.51 805,175.17 805,175.17 806,120.39 806,120.39 807,292.76 807,292.76
48 Beton K-500 (fc' 45 MPa) M3 836,800 836,800 839,064.17 839,064.17 840,220.90 840,220.90 840,244.29 840,244.29 839,134.54 839,134.54 837,935.90 837,935.90 837,754.51 837,754.51 838,737.98 838,737.98 839,957.79 839,957.79
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 75,000 75,000 75,202.92 75,202.92 75,306.60 75,306.60 75,308.69 75,308.69 75,209.23 75,209.23 75,101.80 75,101.80 75,085.54 75,085.54 75,173.69 75,173.69 75,283.02 75,283.02
51 Cat Anti Karat Kg 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
52 Cat Marka (Non Thermoplas) Kg 60,436 60,436 60,599.08 60,599.08 60,682.62 60,682.62 60,684.31 60,684.31 60,604.16 60,604.16 60,517.59 60,517.59 60,504.49 60,504.49 60,575.52 60,575.52 60,663.62 60,663.62
53 Cat Marka (Thermoplastic) Kg 41,282 41,282 41,393.83 41,393.83 41,450.90 41,450.90 41,452.05 41,452.05 41,397.30 41,397.30 41,338.17 41,338.17 41,329.22 41,329.22 41,377.74 41,377.74 41,437.92 41,437.92
54 Cerucuk Diameter 10-15 cm M' 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,422,000 1,422,000 1,425,847.44 1,425,847.44 1,427,813.10 1,427,813.10 1,427,852.84 1,427,852.84 1,425,967.01 1,425,967.01 1,423,930.14 1,423,930.14 1,423,621.89 1,423,621.89 1,425,293.12 1,425,293.12 1,427,365.98 1,427,365.98
57 Curing Compound Liter 51,000 51,000 51,137.99 51,137.99 51,208.49 51,208.49 51,209.91 51,209.91 51,142.28 51,142.28 51,069.22 51,069.22 51,058.17 51,058.17 51,118.11 51,118.11 51,192.45 51,192.45
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 567,000 567,000 568,534.11 568,534.11 569,317.88 569,317.88 569,333.73 569,333.73 568,581.78 568,581.78 567,769.61 567,769.61 567,646.70 567,646.70 568,313.08 568,313.08 569,139.60 569,139.60
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 660,000 660,000 661,785.73 661,785.73 662,698.06 662,698.06 662,716.51 662,716.51 661,841.23 661,841.23 660,895.84 660,895.84 660,752.78 660,752.78 661,528.45 661,528.45 662,490.54 662,490.54
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 837,000 837,000 839,264.63 839,264.63 840,421.63 840,421.63 840,445.03 840,445.03 839,335.01 839,335.01 838,136.09 838,136.09 837,954.66 837,954.66 838,938.36 838,938.36 840,158.46 840,158.46
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
64 Oxygen (Isi 6 M3) Botol 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,283,000 1,283,000 1,286,471.35 1,286,471.35 1,288,244.87 1,288,244.87 1,288,280.73 1,288,280.73 1,286,579.23 1,286,579.23 1,284,741.47 1,284,741.47 1,284,463.35 1,284,463.35 1,285,971.22 1,285,971.22 1,287,841.46 1,287,841.46
67 Seal Coat M2 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
68 Seal Guard Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
69 Semen/PC (50 kg) Zak 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 10,000 11,000 10,027.06 11,029.76 10,040.88 11,044.97 10,041.16 11,045.28 10,027.90 11,030.69 10,013.57 11,014.93 10,011.41 11,012.55 10,023.16 11,025.47 10,037.74 11,041.51
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,087,000 12,087,000 12,119,703.23 12,119,703.23 12,136,411.31 12,136,411.31 12,136,749.16 12,136,749.16 12,120,719.57 12,120,719.57 12,103,406.18 12,103,406.18 12,100,786.10 12,100,786.10 12,114,991.55 12,114,991.55 12,132,610.86 12,132,610.86
87 Box Culvert Type DUB 200×200 M' 12,831,000 12,831,000 12,865,716.24 12,865,716.24 12,883,452.77 12,883,452.77 12,883,811.41 12,883,811.41 12,866,795.14 12,866,795.14 12,848,416.04 12,848,416.04 12,845,634.68 12,845,634.68 12,860,714.54 12,860,714.54 12,879,418.38 12,879,418.38
88 Box Culvert Type uk 300×200 M' 13,854,000 13,854,000 13,891,484.12 13,891,484.12 13,910,634.76 13,910,634.76 13,911,022.00 13,911,022.00 13,892,649.04 13,892,649.04 13,872,804.60 13,872,804.60 13,869,801.49 13,869,801.49 13,886,083.64 13,886,083.64 13,906,278.72 13,906,278.72
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
91 Ducting (Strand Prestress) M' 157,000 157,000 157,424.79 157,424.79 157,641.81 157,641.81 157,646.20 157,646.20 157,437.99 157,437.99 157,213.10 157,213.10 157,179.07 157,179.07 157,363.59 157,363.59 157,592.45 157,592.45
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,023,000 2,023,000 2,028,473.54 2,028,473.54 2,031,269.97 2,031,269.97 2,031,326.51 2,031,326.51 2,028,643.64 2,028,643.64 2,025,745.90 2,025,745.90 2,025,307.38 2,025,307.38 2,027,684.94 2,027,684.94 2,030,633.89 2,030,633.89
94 Expansion Join Tipe Rubber M' 1,465,000 1,465,000 1,468,963.78 1,468,963.78 1,470,988.88 1,470,988.88 1,471,029.83 1,471,029.83 1,469,086.97 1,469,086.97 1,466,988.50 1,466,988.50 1,466,670.94 1,466,670.94 1,468,392.70 1,468,392.70 1,470,528.25 1,470,528.25
95 Expansion Join Tipe Torma M' 1,680,000 1,680,000 1,684,545.50 1,684,545.50 1,686,867.79 1,686,867.79 1,686,914.75 1,686,914.75 1,684,686.76 1,684,686.76 1,682,280.33 1,682,280.33 1,681,916.16 1,681,916.16 1,683,890.61 1,683,890.61 1,686,339.56 1,686,339.56
96 Expansion Tipe Joint Asphaltic Plug M' 1,993,000 1,993,000 1,998,392.37 1,998,392.37 2,001,147.33 2,001,147.33 2,001,203.03 2,001,203.03 1,998,559.95 1,998,559.95 1,995,705.18 1,995,705.18 1,995,273.16 1,995,273.16 1,997,615.47 1,997,615.47 2,000,520.68 2,000,520.68
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
99 Glass Bead Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
100 Joint Sealent Kg 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
101 Joint Socket Pile 16×16×16 Set 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
102 Joint Socket Pile 35×35 Set 727,000 727,000 728,967.01 728,967.01 729,971.96 729,971.96 729,992.28 729,992.28 729,028.14 729,028.14 727,986.79 727,986.79 727,829.20 727,829.20 728,683.62 728,683.62 729,743.37 729,743.37
103 Kawat Beton Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
104 Kawat Bronjong Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
105 Kawat Las Dos 167,000 167,000 167,451.84 167,451.84 167,682.69 167,682.69 167,687.36 167,687.36 167,465.89 167,465.89 167,226.68 167,226.68 167,190.48 167,190.48 167,386.75 167,386.75 167,630.18 167,630.18
106 Kayu Acuan (Kelas III/Meranti) M3 3,998,000 3,998,000 4,008,817.20 4,008,817.20 4,014,343.71 4,014,343.71 4,014,455.46 4,014,455.46 4,009,153.38 4,009,153.38 4,003,426.65 4,003,426.65 4,002,560.01 4,002,560.01 4,007,258.73 4,007,258.73 4,013,086.64 4,013,086.64
107 Kayu Perancah (Gelam) M3 2,575,000 2,575,000 2,581,967.06 2,581,967.06 2,585,526.53 2,585,526.53 2,585,598.50 2,585,598.50 2,582,183.58 2,582,183.58 2,578,495.15 2,578,495.15 2,577,936.97 2,577,936.97 2,580,963.29 2,580,963.29 2,584,716.88 2,584,716.88
108 Kerb Pracetak Type 1 (Peninggi) Buah 51,000 51,000 51,137.99 51,137.99 51,208.49 51,208.49 51,209.91 51,209.91 51,142.28 51,142.28 51,069.22 51,069.22 51,058.17 51,058.17 51,118.11 51,118.11 51,192.45 51,192.45
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
110 Marmer Nama Jembatan Buah 558,000 558,000 559,509.75 559,509.75 560,281.09 560,281.09 560,296.69 560,296.69 559,556.67 559,556.67 558,757.40 558,757.40 558,636.44 558,636.44 559,292.24 559,292.24 560,105.64 560,105.64
111 Mata Kucing Buah 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
112 Matras Concrete (Tebal=10 cm) M2 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12 136,314.95 136,314.95 136,513.20 136,513.20
113 Mini Pile 16×16×16 M' 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
114 Mini Timber Pile Buah 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
115 Multipleks 12 mm Lbr 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 61,810,000 61,810,000 61,977,236.43 61,977,236.43 62,062,677.53 62,062,677.53 62,064,405.20 62,064,405.20 61,982,433.75 61,982,433.75 61,893,897.23 61,893,897.23 61,880,498.78 61,880,498.78 61,953,142.04 61,953,142.04 62,043,242.95 62,043,242.95
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 87,564,000 87,564,000 87,800,917.82 87,800,917.82 87,921,959.16 87,921,959.16 87,924,406.69 87,924,406.69 87,808,280.68 87,808,280.68 87,682,854.18 87,682,854.18 87,663,873.08 87,663,873.08 87,766,784.16 87,766,784.16 87,894,426.89 87,894,426.89
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 167,360,000 167,360,000 167,812,818.14 167,812,818.14 168,044,162.95 168,044,162.95 168,048,840.88 168,048,840.88 167,826,890.67 167,826,890.67 167,587,164.54 167,587,164.54 167,550,886.20 167,550,886.20 167,747,578.89 167,747,578.89 167,991,540.86 167,991,540.86
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 219,466,000 219,466,000 220,059,798.91 220,059,798.91 220,363,170.81 220,363,170.81 220,369,305.17 220,369,305.17 220,078,252.80 220,078,252.80 219,763,890.14 219,763,890.14 219,716,316.87 219,716,316.87 219,974,248.02 219,974,248.02 220,294,165.31 220,294,165.31
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 279,761,000 279,761,000 280,517,936.27 280,517,936.27 280,904,655.07 280,904,655.07 280,912,474.75 280,912,474.75 280,541,460.10 280,541,460.10 280,140,731.00 280,140,731.00 280,080,087.68 280,080,087.68 280,408,881.56 280,408,881.56 280,816,691.34 280,816,691.34
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 337,532,000 337,532,000 338,445,244.57 338,445,244.57 338,911,821.28 338,911,821.28 338,921,255.74 338,921,255.74 338,473,626.09 338,473,626.09 337,990,145.93 337,990,145.93 337,916,979.69 337,916,979.69 338,313,669.92 338,313,669.92 338,805,692.93 338,805,692.93
124 Pelat Rambu (Eng. Grade) Buah 195,000 195,000 195,527.60 195,527.60 195,797.15 195,797.15 195,802.60 195,802.60 195,544.00 195,544.00 195,264.68 195,264.68 195,222.41 195,222.41 195,451.59 195,451.59 195,735.84 195,735.84
125 Pelat Rambu (High L Grade) Buah 228,000 228,000 228,616.89 228,616.89 228,932.06 228,932.06 228,938.43 228,938.43 228,636.06 228,636.06 228,309.47 228,309.47 228,260.05 228,260.05 228,528.01 228,528.01 228,860.37 228,860.37
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 256,000 256,000 256,692.65 256,692.65 257,046.52 257,046.52 257,053.68 257,053.68 256,714.17 256,714.17 256,347.48 256,347.48 256,291.99 256,291.99 256,592.85 256,592.85 256,966.03 256,966.03
129 Pipa Galvanis Dia 1,5" M' 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
130 Pipa Galvanis Dia 2" M' 293,000 293,000 293,792.76 293,792.76 294,197.78 294,197.78 294,205.97 294,205.97 293,817.39 293,817.39 293,397.70 293,397.70 293,334.19 293,334.19 293,678.54 293,678.54 294,105.65 294,105.65
131 Pipa Galvanis Dia 3" M' 224,000 224,000 224,606.07 224,606.07 224,915.71 224,915.71 224,921.97 224,921.97 224,624.90 224,624.90 224,304.04 224,304.04 224,255.49 224,255.49 224,518.75 224,518.75 224,845.27 224,845.27
132 Pipa Porus M' 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
133 Pipa PVC Dia 4" M' 220,000 220,000 220,595.24 220,595.24 220,899.35 220,899.35 220,905.50 220,905.50 220,613.74 220,613.74 220,298.61 220,298.61 220,250.93 220,250.93 220,509.48 220,509.48 220,830.18 220,830.18
134 Plastik Filter M2 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
135 Rel Pengaman M' 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,910,000 1,910,000 1,915,167.80 1,915,167.80 1,917,808.03 1,917,808.03 1,917,861.41 1,917,861.41 1,915,328.40 1,915,328.40 1,912,592.52 1,912,592.52 1,912,178.49 1,912,178.49 1,914,423.25 1,914,423.25 1,917,207.48 1,917,207.48
137 Strip Bearing Buah 293,000 293,000 293,792.76 293,792.76 294,197.78 294,197.78 294,205.97 294,205.97 293,817.39 293,817.39 293,397.70 293,397.70 293,334.19 293,334.19 293,678.54 293,678.54 294,105.65 294,105.65
138 Tiang Pancang Baja Diameter 400 M' 677,000 677,000 678,831.73 678,831.73 679,767.56 679,767.56 679,786.48 679,786.48 678,888.65 678,888.65 677,918.92 677,918.92 677,772.17 677,772.17 678,567.82 678,567.82 679,554.69 679,554.69
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 827,000 827,000 829,237.58 829,237.58 830,380.75 830,380.75 830,403.87 830,403.87 829,307.11 829,307.11 828,122.52 828,122.52 827,943.25 827,943.25 828,915.20 828,915.20 830,120.72 830,120.72
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,729,000 1,729,000 1,733,678.07 1,733,678.07 1,736,068.10 1,736,068.10 1,736,116.43 1,736,116.43 1,733,823.46 1,733,823.46 1,731,346.84 1,731,346.84 1,730,972.05 1,730,972.05 1,733,004.09 1,733,004.09 1,735,524.46 1,735,524.46
HARGA SATUAN DASAR UPAH KABUPATEN PONOROGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 112,289.88
2 Tukang OH 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 126,326.11
3 Mandor OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70
4 Operator OH 299,241.21 299,241.21 298,938.78 298,938.78 298,503.93 298,503.93 298,339.86 298,339.86 298,592.55 298,592.55 299,021.19 299,021.19 299,227.44 299,227.44 298,771.28 298,771.28
5 Pembantu Operator OH 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 186,481.40
6 Sopir OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76
7 Pembantu Sopir OH 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 121,313.17
8 Mekanik OH 167,695.58 167,695.58 167,526.10 167,526.10 167,282.40 167,282.40 167,190.46 167,190.46 167,332.07 167,332.07 167,572.28 167,572.28 167,687.86 167,687.86 167,432.23 167,432.23
9 Pembantu Mekanik OH 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 121,313.17
10 Kepala Tukang OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76
11 Pemasak Aspal OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76

HARGA SATUAN DASAR ALAT KABUPATEN PONOROGO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 439,749.40 491,036.76 439,304.97 490,540.49 438,665.92 489,826.91 438,424.81 489,557.68 438,796.16 489,972.34 439,426.06 490,675.71 439,729.16 491,014.16 439,058.80 892,728.83
2 Asphalt Distribution Unit/Jam 270,758.65 348,445.31 270,485.01 348,093.15 270,091.54 347,586.79 269,943.09 347,395.74 270,171.73 347,689.99 270,559.57 348,189.10 270,746.19 348,429.27 270,333.45 595,699.23
3 Asphalt Finisher Unit/Jam 198,867.56 942,911.08 198,666.58 941,958.12 198,377.58 940,587.87 198,268.55 940,070.89 198,436.48 940,867.14 198,721.34 942,217.77 198,858.41 942,867.67 198,555.26 1,123,435.96
4 Asphalt Liquid Mixer Unit/Jam 70,957.44 129,537.30 70,885.73 129,406.39 70,782.61 129,218.14 70,743.71 129,147.12 70,803.63 129,256.51 70,905.27 129,442.06 70,954.17 129,531.34 70,846.01 194,274.86
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 95,232.35 95,395.69 95,136.11 95,299.28 94,997.71 95,160.65 94,945.50 95,108.34 95,025.92 95,188.90 95,162.33 95,325.55 95,227.97 95,391.30 95,082.80 182,403.52
6 Asphalt Mixing Plant Unit/Jam 1,064,361.61 1,482,147.76 1,063,285.90 1,480,649.82 1,061,739.17 1,478,495.95 1,061,155.59 1,477,683.31 1,062,054.41 1,478,934.93 1,063,579.00 1,481,057.96 1,064,312.61 1,482,079.54 1,062,690.10 2,453,934.94
7 Asphalt Sprayer Unit/Jam 87,763.15 87,763.15 87,674.45 87,674.45 87,546.91 87,546.91 87,498.79 87,498.79 87,572.91 87,572.91 87,698.62 87,698.62 87,759.11 87,759.11 87,625.32 167,947.07
8 Asphalt Tanker Unit/Jam 410,806.23 475,974.28 410,391.05 475,493.23 409,794.06 474,801.55 409,568.83 474,540.58 409,915.74 474,942.52 410,504.17 475,624.30 410,787.32 475,952.37 410,161.09 851,200.92
9 Blending Equipment Unit/Jam 133,512.03 210,874.68 133,377.09 210,661.56 133,183.07 210,355.12 133,109.87 210,239.50 133,222.61 210,417.57 133,413.86 210,719.63 133,505.88 210,864.97 133,302.35 332,735.11
10 Bore Pile Machine Unit/Jam 367,858.31 639,653.20 367,486.53 639,006.73 366,951.96 638,077.18 366,750.27 637,726.47 367,060.91 638,266.63 367,587.83 639,182.87 367,841.38 639,623.76 367,280.61 975,316.41
11 Bore Pile Machine Dia 60 Unit/Jam 240,881.84 728,019.73 240,638.39 727,283.96 240,288.34 726,225.99 240,156.27 725,826.83 240,359.68 726,441.62 240,704.72 727,484.43 240,870.75 727,986.22 240,503.55 947,333.99
12 Bore Pile Machine Dia 80 Unit/Jam 952,323.54 952,323.54 951,361.07 951,361.07 949,977.15 949,977.15 949,455.00 949,455.00 950,259.20 950,259.20 951,623.31 951,623.31 952,279.71 952,279.71 950,827.98 1,822,404.37
13 Bulldozer 100-150 HP Unit/Jam 373,549.44 541,245.02 373,171.91 540,698.00 372,629.06 539,911.46 372,424.25 539,614.71 372,739.70 540,071.77 373,274.77 540,847.05 373,532.24 541,220.10 372,962.80 882,271.35
14 Cement Tanker Unit/Jam 347,441.14 447,857.66 347,090.00 447,405.03 346,585.09 446,754.20 346,394.60 446,508.64 346,688.00 446,886.84 347,185.67 447,528.35 347,425.15 447,837.04 346,895.51 765,136.06
15 Cold Milling Unit/Jam 542,249.18 1,153,785.76 541,701.15 1,152,619.68 540,913.15 1,150,942.99 540,615.85 1,150,310.38 541,073.75 1,151,284.71 541,850.47 1,152,937.40 542,224.22 1,153,732.65 541,397.62 1,648,245.89
16 Cold Recycler Unit/Jam 4,568,951.44 4,568,951.44 4,564,333.79 4,564,333.79 4,557,694.16 4,557,694.16 4,555,189.08 4,555,189.08 4,559,047.38 4,559,047.38 4,565,591.95 4,565,591.95 4,568,741.12 4,568,741.12 4,561,776.20 8,743,327.96
17 Compressor 4000-6500 L\M Unit/Jam 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
18 Concrete Breaker Unit/Jam 507,103.40 966,006.88 506,590.89 965,030.57 505,853.97 963,626.77 505,575.93 963,097.12 506,004.16 963,912.87 506,730.54 965,296.58 507,080.06 965,962.41 506,307.03 1,428,596.12
19 Concrete Mixer (350) Unit/Jam 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 205,612.33
21 Concrete Pan Mixer Unit/Jam 286,187.07 611,536.58 285,897.83 610,918.52 285,481.94 610,029.83 285,325.03 609,694.54 285,566.70 610,210.96 285,976.64 611,086.92 286,173.89 611,508.43 285,737.63 872,497.57
22 Concrete Pump Unit/Jam 216,899.67 232,966.31 216,680.46 232,730.87 216,365.26 232,392.32 216,246.34 232,264.59 216,429.50 232,461.32 216,740.19 232,795.02 216,889.69 232,955.59 216,559.05 431,109.29
23 Concrete Vibrator Unit/Jam 81,337.38 81,337.38 81,255.17 81,255.17 81,136.97 81,136.97 81,092.38 81,092.38 81,161.06 81,161.06 81,277.57 81,277.57 81,333.63 81,333.63 81,209.64 155,650.45
24 Crane 10-15 Ton Unit/Jam 291,207.89 291,207.89 290,913.58 290,913.58 290,490.40 290,490.40 290,330.73 290,330.73 290,576.65 290,576.65 290,993.77 290,993.77 291,194.49 291,194.49 290,750.57 557,267.06
25 Crane On Track 35 Ton Unit/Jam 240,999.64 458,903.47 240,756.07 458,439.68 240,405.85 457,772.80 240,273.71 457,521.19 240,477.22 457,908.71 240,822.43 458,566.05 240,988.54 458,882.35 240,621.16 678,748.16
26 Crane On Track 75-100 Ton Unit/Jam 379,574.43 576,390.80 379,190.81 575,808.26 378,639.21 574,970.65 378,431.09 574,654.62 378,751.63 575,141.36 379,295.33 575,966.98 379,556.95 576,364.26 378,978.33 922,876.07
27 Dump Truck 10 Ton Unit/Jam 359,455.46 386,603.58 359,092.17 386,212.86 358,569.81 385,651.04 358,372.72 385,439.08 358,676.27 385,765.55 359,191.15 386,319.32 359,438.91 386,585.79 358,890.95 714,973.81
28 Dump Truck 3-4 M3 Unit/Jam 196,066.61 257,066.28 195,868.46 256,806.47 195,583.53 256,432.90 195,476.03 256,291.96 195,641.60 256,509.04 195,922.45 256,877.26 196,057.59 257,054.45 195,758.70 436,104.77
29 Excavator 80-140 HP Unit/Jam 283,829.76 450,870.15 283,542.91 450,414.48 283,130.44 449,759.27 282,974.82 449,512.06 283,214.51 449,892.81 283,621.07 450,538.63 283,816.70 450,849.40 283,384.03 709,926.03
30 Flat Bed Truck 3-4 M3 Unit/Jam 344,517.05 459,907.64 344,168.86 459,442.83 343,668.20 458,774.49 343,479.31 458,522.33 343,770.24 458,910.70 344,263.73 459,569.48 344,501.19 459,886.47 343,976.01 774,490.96
31 Fulvi Mixer Unit/Jam 862,693.09 1,347,589.63 861,821.21 1,346,227.68 860,567.54 1,344,269.36 860,094.53 1,343,530.49 860,823.04 1,344,668.48 862,058.77 1,346,598.77 862,653.38 1,347,527.60 861,338.29 2,135,019.00
32 Generator Set Unit/Jam 383,730.37 406,686.89 383,342.55 406,275.86 382,784.91 405,684.87 382,574.52 405,461.88 382,898.56 405,805.32 383,448.22 406,387.86 383,712.71 406,668.17 383,127.75 757,242.23
33 Hot Recycler Unit/Jam 2,818,690.96 8,265,283.36 2,815,842.23 8,256,929.98 2,811,746.09 8,244,918.82 2,810,200.65 8,240,387.10 2,812,580.92 8,247,366.80 2,816,618.42 8,259,206.01 2,818,561.21 8,264,902.89 2,814,264.40 10,831,998.49
34 Jack Hammer Unit/Jam 53,218.08 53,218.08 53,164.30 53,164.30 53,086.96 53,086.96 53,057.78 53,057.78 53,102.72 53,102.72 53,178.95 53,178.95 53,215.63 53,215.63 53,134.50 101,840.24
35 Launching Gantry Unit/Jam 67,726,076.07 67,726,922.76 67,657,628.17 67,658,474.01 67,559,208.25 67,560,052.85 67,522,075.07 67,522,919.21 67,579,267.10 67,580,111.96 67,676,278.07 67,677,124.14 67,722,958.48 67,723,805.13 67,619,716.79 129,604,169.67
36 Motor Grader > 100 HP Unit/Jam 266,090.40 446,853.49 265,821.48 446,401.88 265,434.79 445,752.51 265,288.90 445,507.50 265,513.60 445,884.85 265,894.75 446,524.93 266,078.15 446,832.92 265,672.52 689,680.44
37 Pedestrian Roller Unit/Jam 87,763.15 87,763.15 87,674.45 87,674.45 87,546.91 87,546.91 87,498.79 87,498.79 87,572.91 87,572.91 87,698.62 87,698.62 87,759.11 87,759.11 87,625.32 167,947.07
38 Pile Driver + Hammer Unit/Jam 99,900.61 292,212.06 99,799.64 291,916.73 99,654.47 291,492.09 99,599.69 291,331.87 99,684.05 291,578.63 99,827.15 291,997.20 99,896.01 292,198.61 99,743.72 383,183.23
39 Rock Drill Breaker Unit/Jam 97,099.66 315,307.86 97,001.52 314,989.19 96,860.42 314,530.98 96,807.18 314,358.10 96,889.17 314,624.37 97,028.26 315,076.02 97,095.19 315,293.34 96,947.17 403,679.30
40 Split Form Paver Unit/Jam 205,403.12 205,403.12 205,195.53 205,195.53 204,897.03 204,897.03 204,784.41 204,784.41 204,957.87 204,957.87 205,252.09 205,252.09 205,393.66 205,393.66 205,080.55 393,067.61
41 Stone Crusher Unit/Jam 549,920.16 684,840.63 549,364.38 684,148.49 548,565.24 683,153.28 548,263.72 682,777.79 548,728.11 683,356.11 549,515.82 684,337.08 549,894.85 684,809.11 549,056.55 1,187,057.78
42 Tamper Unit/Jam 82,161.25 82,161.25 82,078.21 82,078.21 81,958.81 81,958.81 81,913.77 81,913.77 81,983.15 81,983.15 82,100.83 82,100.83 82,157.46 82,157.46 82,032.22 157,227.04
43 Tandem Roller 6-8 T Unit/Jam 396,645.23 462,920.13 396,244.36 462,452.28 395,667.95 461,779.56 395,450.48 461,525.75 395,785.43 461,916.67 396,353.59 462,579.76 396,626.98 462,898.83 396,022.33 825,206.98
44 Three Wheel Roller 6-8 T Unit/Jam 131,545.63 166,691.42 131,412.69 166,522.95 131,221.52 166,280.71 131,149.40 166,189.32 131,260.48 166,330.08 131,448.91 166,568.85 131,539.58 166,683.74 131,339.05 286,821.57
45 Tire Roller 8-10 T Unit/Jam 234,974.65 424,761.86 234,737.17 424,332.57 234,395.70 423,715.30 234,266.87 423,482.41 234,465.29 423,841.11 234,801.87 424,449.54 234,963.83 424,742.31 234,605.63 639,146.03
46 Track Loader 75-100 HP Unit/Jam 220,916.33 290,203.73 220,693.06 289,910.43 220,372.03 289,488.71 220,250.90 289,329.59 220,437.46 289,574.66 220,753.90 289,990.35 220,906.16 290,190.37 220,569.40 491,932.90
47 Trailer 20 Ton Unit/Jam 355,720.85 492,040.92 355,361.34 491,543.64 354,844.41 490,828.60 354,649.37 490,558.82 354,949.76 490,974.33 355,459.30 491,679.13 355,704.48 492,018.27 355,162.22 816,827.62
48 Trailler 15 Ton Unit/Jam 308,104.68 468,945.13 307,793.29 468,471.18 307,345.55 467,789.71 307,176.62 467,532.59 307,436.80 467,928.60 307,878.13 468,600.32 308,090.49 468,923.54 307,620.82 750,189.27
49 Truck Mixer (agitator) Unit/Jam 387,464.97 569,361.64 387,073.38 568,786.21 386,510.31 567,958.81 386,297.87 567,646.64 386,625.07 568,127.44 387,180.07 568,943.00 387,447.14 569,335.43 386,856.48 923,079.46
50 Vibrating Rammer Unit/Jam 79,360.30 79,360.30 79,280.09 79,280.09 79,164.76 79,164.76 79,121.25 79,121.25 79,188.27 79,188.27 79,301.94 79,301.94 79,356.64 79,356.64 79,235.67 151,867.03
51 Vibratory Roller 5-8 T Unit/Jam 191,398.36 410,703.55 191,204.92 410,288.47 190,926.78 409,691.63 190,821.84 409,466.45 190,983.47 409,813.27 191,257.63 410,401.56 191,389.55 410,684.64 191,097.78 585,228.33
52 Water Pump 70-100 MM Unit/Jam 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
53 Water Tanker 3000-4500 L Unit/Jam 215,895.51 215,895.51 215,677.31 215,677.31 215,363.57 215,363.57 215,245.20 215,245.20 215,427.51 215,427.51 215,736.76 215,736.76 215,885.57 215,885.57 215,556.46 413,146.27
54 Welding Set Unit/Jam 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 232,514.88
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 210,874.68 336,395.33 210,661.56 336,055.34 210,355.12 335,566.49 210,239.50 335,382.05 210,417.57 335,666.13 210,719.63 336,147.98 210,864.97 336,379.84 210,543.52 528,861.74
HARGA SATUAN DASAR BAHAN KABUPATEN PONOROGO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 294,220.39 294,220.39 293,923.03 293,923.03 293,495.47 293,495.47 293,334.15 293,334.15 293,582.61 293,582.61 294,004.05 294,004.05 294,206.85 294,206.85 293,758.34 563,031.89
2 Agregat Pecah Mesin 20-30 mm M3 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 321,332.85 321,332.85 321,008.09 321,008.09 320,541.13 320,541.13 320,364.95 320,364.95 320,636.30 320,636.30 321,096.58 321,096.58 321,318.06 321,318.06 320,828.22 614,915.37
4 Bahan Agr. Base Kelas A M3 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
5 Bahan Agr. Base Kelas B M3 289,199.56 289,199.56 288,907.28 288,907.28 288,487.02 288,487.02 288,328.45 288,328.45 288,572.67 288,572.67 288,986.92 288,986.92 289,186.25 289,186.25 288,745.39 553,423.84
6 Bahan Agr. Base Kelas C M3 266,103.76 266,103.76 265,834.83 265,834.83 265,448.12 265,448.12 265,302.22 265,302.22 265,526.94 265,526.94 265,908.10 265,908.10 266,091.52 266,091.52 265,685.87 509,226.79
7 Bahan Agr. Base Kelas C2 M3 243,007.97 243,007.97 242,762.37 242,762.37 242,409.23 242,409.23 242,275.99 242,275.99 242,481.20 242,481.20 242,829.29 242,829.29 242,996.78 242,996.78 242,626.34 465,029.75
8 Bahan Agr. Base Kelas S M3 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
9 Bahan Pilihan M3 195,812.20 195,812.20 195,614.31 195,614.31 195,329.75 195,329.75 195,222.39 195,222.39 195,387.74 195,387.74 195,668.23 195,668.23 195,803.19 195,803.19 195,504.69 374,714.06
10 Bahan Tanah Timbunan M3 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 215,220.38
11 Batu Belah/Kerakal M3 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46 315,815.28 605,307.32
12 Batu Kali M3 348,445.31 348,445.31 348,093.15 348,093.15 347,586.79 347,586.79 347,395.74 347,395.74 347,689.99 347,689.99 348,189.10 348,189.10 348,429.27 348,429.27 347,898.10 666,798.86
13 Chipping M3 207,862.19 207,862.19 207,652.11 207,652.11 207,350.04 207,350.04 207,236.07 207,236.07 207,411.61 207,411.61 207,709.35 207,709.35 207,852.62 207,852.62 207,535.75 397,773.38
14 Chipping (kg) Kg 269.12 269.12 268.84 268.84 268.45 268.45 268.31 268.31 268.53 268.53 268.92 268.92 269.10 269.10 268.69 514.99
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 372,545.27 372,545.27 372,168.76 372,168.76 371,627.37 371,627.37 371,423.11 371,423.11 371,737.71 371,737.71 372,271.34 372,271.34 372,528.12 372,528.12 371,960.21 712,917.51
18 Kapur M3 93,387.36 93,387.36 93,292.98 93,292.98 93,157.27 93,157.27 93,106.06 93,106.06 93,184.92 93,184.92 93,318.69 93,318.69 93,383.06 93,383.06 93,240.70 178,709.78
19 Pasir Beton (Kasar) M3 443,841.00 443,841.00 443,392.43 443,392.43 442,747.43 442,747.43 442,504.08 442,504.08 442,878.89 442,878.89 443,514.65 443,514.65 443,820.57 443,820.57 443,143.97 849,351.86
20 Pasir Halus (untuk HRS) M3 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
21 Pasir Pasang (Sedang) M3 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 599,542.49
22 Pasir Urug M3 190,791.38 190,791.38 190,598.55 190,598.55 190,321.29 190,321.29 190,216.69 190,216.69 190,377.80 190,377.80 190,651.09 190,651.09 190,782.60 190,782.60 190,491.75 365,106.00
23 Pasir Urug (ada unsur lempung) M3 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
24 Sirtu M3 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 276,711.92
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
26 Anti Pengelupas Liter 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
27 Arbocell Kg 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 550,853.81 550,853.81 550,297.09 550,297.09 549,496.59 549,496.59 549,194.56 549,194.56 549,659.74 549,659.74 550,448.78 550,448.78 550,828.46 550,828.46 549,988.74 1,054,135.86
41 Beton K-125 (fc' 10 MPa) M3 569,526.83 569,526.83 568,951.23 568,951.23 568,123.59 568,123.59 567,811.33 567,811.33 568,292.27 568,292.27 569,108.06 569,108.06 569,500.61 569,500.61 568,632.42 1,089,869.28
42 Beton K-175 (fc' 15 MPa) M3 616,209.35 616,209.35 615,586.58 615,586.58 614,691.10 614,691.10 614,353.24 614,353.24 614,873.60 614,873.60 615,756.26 615,756.26 616,180.99 616,180.99 615,241.64 1,179,202.83
43 Beton K-250 (fc' 20 MPa) M3 686,233.14 686,233.14 685,539.60 685,539.60 684,542.36 684,542.36 684,166.11 684,166.11 684,745.60 684,745.60 685,728.57 685,728.57 686,201.55 686,201.55 685,155.46 1,313,203.15
44 Beton K-300 (fc' 25 MPa) M3 714,242.66 714,242.66 713,520.80 713,520.80 712,482.86 712,482.86 712,091.25 712,091.25 712,694.40 712,694.40 713,717.49 713,717.49 714,209.78 714,209.78 713,120.99 1,366,803.28
45 Beton K-350 (fc' 30 MPa) M3 742,252.17 742,252.17 741,502.01 741,502.01 740,423.37 740,423.37 740,016.40 740,016.40 740,643.20 740,643.20 741,706.41 741,706.41 742,218.01 742,218.01 741,086.52 1,420,403.41
46 Beton K-400 (fc' 35 MPa) M3 770,261.69 770,261.69 769,483.22 769,483.22 768,363.87 768,363.87 767,941.55 767,941.55 768,592.00 768,592.00 769,695.33 769,695.33 770,226.23 770,226.23 769,052.05 1,474,003.54
47 Beton K-450 (fc' 40 MPa) M3 807,607.71 807,607.71 806,791.50 806,791.50 805,617.88 805,617.88 805,175.08 805,175.08 805,857.07 805,857.07 807,013.89 807,013.89 807,570.54 807,570.54 806,339.42 1,545,470.37
48 Beton K-500 (fc' 45 MPa) M3 840,285.48 840,285.48 839,436.24 839,436.24 838,215.13 838,215.13 837,754.42 837,754.42 838,464.00 838,464.00 839,667.63 839,667.63 840,246.80 840,246.80 838,965.87 1,608,003.86
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 75,312.39 75,312.39 75,236.27 75,236.27 75,126.83 75,126.83 75,085.53 75,085.53 75,149.13 75,149.13 75,257.01 75,257.01 75,308.92 75,308.92 75,194.11 144,120.79
51 Cat Anti Karat Kg 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
52 Cat Marka (Non Thermoplas) Kg 60,687.28 60,687.28 60,625.95 60,625.95 60,537.76 60,537.76 60,504.49 60,504.49 60,555.73 60,555.73 60,642.66 60,642.66 60,684.49 60,684.49 60,591.98 116,133.61
53 Cat Marka (Thermoplastic) Kg 41,454.08 41,454.08 41,412.19 41,412.19 41,351.95 41,351.95 41,329.22 41,329.22 41,364.22 41,364.22 41,423.60 41,423.60 41,452.18 41,452.18 41,388.98 79,328.19
54 Cerucuk Diameter 10-15 cm M' 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,427,922.84 1,427,922.84 1,426,479.70 1,426,479.70 1,424,404.64 1,424,404.64 1,423,621.73 1,423,621.73 1,424,827.55 1,424,827.55 1,426,872.91 1,426,872.91 1,427,857.11 1,427,857.11 1,425,680.39 2,732,530.19
57 Curing Compound Liter 51,212.42 51,212.42 51,160.66 51,160.66 51,086.24 51,086.24 51,058.16 51,058.16 51,101.41 51,101.41 51,174.77 51,174.77 51,210.07 51,210.07 51,132.00 98,002.14
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 569,361.64 569,361.64 568,786.21 568,786.21 567,958.81 567,958.81 567,646.64 567,646.64 568,127.44 568,127.44 568,943.00 568,943.00 569,335.43 569,335.43 568,467.50 1,089,553.18
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 662,749.00 662,749.00 662,079.19 662,079.19 661,116.08 661,116.08 660,752.70 660,752.70 661,312.37 661,312.37 662,261.69 662,261.69 662,718.49 662,718.49 661,708.20 1,268,262.96
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 840,486.23 840,486.23 839,636.79 839,636.79 838,415.39 838,415.39 837,954.56 837,954.56 838,664.32 838,664.32 839,868.23 839,868.23 840,447.54 840,447.54 839,166.30 1,608,388.02
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
64 Oxygen (Isi 6 M3) Botol 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,288,343.89 1,288,343.89 1,287,041.81 1,287,041.81 1,285,169.58 1,285,169.58 1,284,463.21 1,284,463.21 1,285,551.16 1,285,551.16 1,287,396.59 1,287,396.59 1,288,284.58 1,288,284.58 1,286,320.63 2,465,426.32
67 Seal Coat M2 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
68 Seal Guard Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
69 Semen/PC (50 kg) Zak 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 11,045.82 10,031.50 11,034.65 10,016.91 11,018.60 10,011.40 11,012.55 10,019.88 11,021.87 10,034.27 11,037.69 10,041.19 11,045.31 10,025.88 20,218.69
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,137,344.18 12,137,344.18 12,125,077.47 12,125,077.47 12,107,439.42 12,107,439.42 12,100,784.69 12,100,784.69 12,111,034.21 12,111,034.21 12,128,419.76 12,128,419.76 12,136,785.47 12,136,785.47 12,118,283.29 23,226,506.61
87 Box Culvert Type DUB 200×200 M' 12,884,443.05 12,884,443.05 12,871,421.28 12,871,421.28 12,852,697.54 12,852,697.54 12,845,633.19 12,845,633.19 12,856,513.60 12,856,513.60 12,874,969.31 12,874,969.31 12,883,849.95 12,883,849.95 12,864,208.89 24,656,184.86
88 Box Culvert Type uk 300×200 M' 13,911,704.00 13,911,704.00 13,897,644.02 13,897,644.02 13,877,427.46 13,877,427.46 13,869,799.88 13,869,799.88 13,881,547.77 13,881,547.77 13,901,474.92 13,901,474.92 13,911,063.61 13,911,063.61 13,889,856.60 26,621,992.44
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
91 Ducting (Strand Prestress) M' 157,653.93 157,653.93 157,494.59 157,494.59 157,265.49 157,265.49 157,179.05 157,179.05 157,312.18 157,312.18 157,538.01 157,538.01 157,646.67 157,646.67 157,406.34 301,692.85
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,031,426.10 2,031,426.10 2,029,373.02 2,029,373.02 2,026,420.94 2,026,420.94 2,025,307.14 2,025,307.14 2,027,022.60 2,027,022.60 2,029,932.42 2,029,932.42 2,031,332.59 2,031,332.59 2,028,235.88 3,887,418.13
94 Expansion Join Tipe Rubber M' 1,471,101.95 1,471,101.95 1,469,615.17 1,469,615.17 1,467,477.35 1,467,477.35 1,466,670.77 1,466,670.77 1,467,913.06 1,467,913.06 1,470,020.27 1,470,020.27 1,471,034.23 1,471,034.23 1,468,791.68 2,815,159.44
95 Expansion Join Tipe Torma M' 1,686,997.45 1,686,997.45 1,685,292.48 1,685,292.48 1,682,840.92 1,682,840.92 1,681,915.97 1,681,915.97 1,683,340.57 1,683,340.57 1,685,757.03 1,685,757.03 1,686,919.80 1,686,919.80 1,684,348.14 3,228,305.71
96 Expansion Tipe Joint Asphaltic Plug M' 2,001,301.15 2,001,301.15 1,999,278.51 1,999,278.51 1,996,370.21 1,996,370.21 1,995,272.93 1,995,272.93 1,996,962.95 1,996,962.95 1,999,829.62 1,999,829.62 2,001,209.02 2,001,209.02 1,998,158.24 3,829,769.81
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
99 Glass Bead Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
100 Joint Sealent Kg 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
101 Joint Socket Pile 16×16×16 Set 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
102 Joint Socket Pile 35×35 Set 730,028.06 730,028.06 729,290.26 729,290.26 728,229.37 728,229.37 727,829.11 727,829.11 728,445.59 728,445.59 729,491.29 729,491.29 729,994.46 729,994.46 728,881.60 1,397,010.86
103 Kawat Beton Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
104 Kawat Bronjong Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
105 Kawat Las Dos 167,695.58 167,695.58 167,526.10 167,526.10 167,282.40 167,282.40 167,190.46 167,190.46 167,332.07 167,332.07 167,572.28 167,572.28 167,687.86 167,687.86 167,432.23 320,908.96
106 Kayu Acuan (Kelas III/Meranti) M3 4,014,652.27 4,014,652.27 4,010,594.83 4,010,594.83 4,004,760.72 4,004,760.72 4,002,559.54 4,002,559.54 4,005,949.76 4,005,949.76 4,011,700.36 4,011,700.36 4,014,467.47 4,014,467.47 4,008,347.53 7,682,598.94
107 Kayu Perancah (Gelam) M3 2,585,725.26 2,585,725.26 2,583,111.98 2,583,111.98 2,579,354.39 2,579,354.39 2,577,936.67 2,577,936.67 2,580,120.22 2,580,120.22 2,583,824.02 2,583,824.02 2,585,606.24 2,585,606.24 2,581,664.55 4,948,147.14
108 Kerb Pracetak Type 1 (Peninggi) Buah 51,212.42 51,212.42 51,160.66 51,160.66 51,086.24 51,086.24 51,058.16 51,058.16 51,101.41 51,101.41 51,174.77 51,174.77 51,210.07 51,210.07 51,132.00 98,002.14
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
110 Marmer Nama Jembatan Buah 560,324.15 560,324.15 559,757.86 559,757.86 558,943.59 558,943.59 558,636.37 558,636.37 559,109.55 559,109.55 559,912.16 559,912.16 560,298.36 560,298.36 559,444.20 1,072,258.68
111 Mata Kucing Buah 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
112 Matras Concrete (Tebal=10 cm) M2 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17 136,351.99 261,339.03
113 Mini Pile 16×16×16 M' 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 242,122.93
114 Mini Timber Pile Buah 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
115 Multipleks 12 mm Lbr 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 259,417.42
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 62,067,447.97 62,067,447.97 62,004,719.01 62,004,719.01 61,914,522.24 61,914,522.24 61,880,491.60 61,880,491.60 61,932,905.14 61,932,905.14 62,021,810.68 62,021,810.68 62,064,590.86 62,064,590.86 61,969,975.19 118,774,747.56
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 87,928,717.26 87,928,717.26 87,839,851.41 87,839,851.41 87,712,072.89 87,712,072.89 87,663,862.91 87,663,862.91 87,738,115.28 87,738,115.28 87,864,064.55 87,864,064.55 87,924,669.70 87,924,669.70 87,790,631.08 168,263,905.44
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 168,057,079.64 168,057,079.64 167,887,231.41 167,887,231.41 167,643,009.90 167,643,009.90 167,550,866.75 167,550,866.75 167,692,784.41 167,692,784.41 167,933,509.70 167,933,509.70 168,049,343.57 168,049,343.57 167,793,157.21 321,600,740.20
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 220,380,108.99 220,380,108.99 220,157,380.07 220,157,380.07 219,837,122.43 219,837,122.43 219,716,291.36 219,716,291.36 219,902,393.78 219,902,393.78 220,218,066.68 220,218,066.68 220,369,964.36 220,369,964.36 220,034,016.73 421,728,179.07
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 280,926,246.75 280,926,246.75 280,642,326.40 280,642,326.40 280,234,082.77 280,234,082.77 280,080,055.17 280,080,055.17 280,317,286.44 280,317,286.44 280,719,685.75 280,719,685.75 280,913,315.05 280,913,315.05 280,485,070.83 537,591,686.66
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 338,937,871.68 338,937,871.68 338,595,321.42 338,595,321.42 338,102,774.96 338,102,774.96 337,916,940.47 337,916,940.47 338,203,160.30 338,203,160.30 338,688,655.57 338,688,655.57 338,922,269.56 338,922,269.56 338,405,592.38 648,605,049.24
124 Pelat Rambu (Eng. Grade) Buah 195,812.20 195,812.20 195,614.31 195,614.31 195,329.75 195,329.75 195,222.39 195,222.39 195,387.74 195,387.74 195,668.23 195,668.23 195,803.19 195,803.19 195,504.69 374,714.06
125 Pelat Rambu (High L Grade) Buah 228,949.65 228,949.65 228,718.26 228,718.26 228,385.55 228,385.55 228,260.02 228,260.02 228,453.36 228,453.36 228,781.31 228,781.31 228,939.12 228,939.12 228,590.10 438,127.20
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 257,066.28 257,066.28 256,806.47 256,806.47 256,432.90 256,432.90 256,291.96 256,291.96 256,509.04 256,509.04 256,877.26 256,877.26 257,054.45 257,054.45 256,662.57 491,932.30
129 Pipa Galvanis Dia 1,5" M' 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
130 Pipa Galvanis Dia 2" M' 294,220.39 294,220.39 293,923.03 293,923.03 293,495.47 293,495.47 293,334.15 293,334.15 293,582.61 293,582.61 294,004.05 294,004.05 294,206.85 294,206.85 293,758.34 563,031.89
131 Pipa Galvanis Dia 3" M' 224,932.99 224,932.99 224,705.66 224,705.66 224,378.79 224,378.79 224,255.46 224,255.46 224,445.41 224,445.41 224,767.60 224,767.60 224,922.64 224,922.64 224,579.75 430,440.76
132 Pipa Porus M' 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
133 Pipa PVC Dia 4" M' 220,916.33 220,916.33 220,693.06 220,693.06 220,372.03 220,372.03 220,250.90 220,250.90 220,437.46 220,437.46 220,753.90 220,753.90 220,906.16 220,906.16 220,569.40 422,754.32
134 Plastik Filter M2 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
135 Rel Pengaman M' 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,917,955.44 1,917,955.44 1,916,017.04 1,916,017.04 1,913,229.86 1,913,229.86 1,912,178.27 1,912,178.27 1,913,797.91 1,913,797.91 1,916,545.19 1,916,545.19 1,917,867.15 1,917,867.15 1,914,943.42 3,670,276.13
137 Strip Bearing Buah 294,220.39 294,220.39 293,923.03 293,923.03 293,495.47 293,495.47 293,334.15 293,334.15 293,582.61 293,582.61 294,004.05 294,004.05 294,206.85 294,206.85 293,758.34 563,031.89
138 Tiang Pancang Baja Diameter 400 M' 679,819.81 679,819.81 679,132.74 679,132.74 678,144.82 678,144.82 677,772.09 677,772.09 678,346.17 678,346.17 679,319.95 679,319.95 679,788.51 679,788.51 678,752.20 1,300,930.34
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 830,444.58 830,444.58 829,605.28 829,605.28 828,398.48 828,398.48 827,943.16 827,943.16 828,644.44 828,644.44 829,833.97 829,833.97 830,406.35 830,406.35 829,140.42 1,589,171.92
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,736,201.55 1,736,201.55 1,734,446.84 1,734,446.84 1,731,923.78 1,731,923.78 1,730,971.85 1,730,971.85 1,732,438.00 1,732,438.00 1,734,924.94 1,734,924.94 1,736,121.62 1,736,121.62 1,733,474.96 3,322,464.63
HARGA SATUAN DASAR UPAH KABUPATEN NGAWI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 114,000 114,000 114,308.44 114,308.44 114,466.03 114,466.03 114,469.22 114,469.22 114,318.03 114,318.03 114,154.74 114,154.74 114,130.03 114,130.03 114,264.01 114,264.01 114,430.18 114,430.18
2 Tukang OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
3 Mandor OH 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
4 Operator OH 305,000 305,000 305,825.22 305,825.22 306,246.83 306,246.83 306,255.36 306,255.36 305,850.87 305,850.87 305,413.99 305,413.99 305,347.87 305,347.87 305,706.33 305,706.33 306,150.93 306,150.93
5 Pembantu Operator OH 191,000 191,000 191,516.78 191,516.78 191,780.80 191,780.80 191,786.14 191,786.14 191,532.84 191,532.84 191,259.25 191,259.25 191,217.85 191,217.85 191,442.33 191,442.33 191,720.75 191,720.75
6 Sopir OH 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62
7 Pembantu Sopir OH 124,000 124,000 124,335.50 124,335.50 124,506.91 124,506.91 124,510.37 124,510.37 124,345.93 124,345.93 124,168.31 124,168.31 124,141.43 124,141.43 124,287.16 124,287.16 124,467.92 124,467.92
8 Mekanik OH 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
9 Pembantu Mekanik OH 124,000 124,000 124,335.50 124,335.50 124,506.91 124,506.91 124,510.37 124,510.37 124,345.93 124,345.93 124,168.31 124,168.31 124,141.43 124,141.43 124,287.16 124,287.16 124,467.92 124,467.92
10 Kepala Tukang OH 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62
11 Pemasak Aspal OH 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62

HARGA SATUAN DASAR ALAT KABUPATEN NGAWI TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 448,725 501,000 449,939.35 502,355.53 450,559.63 503,048.07 450,572.17 503,062.08 449,977.08 502,397.66 449,334.33 501,680.03 449,237.06 501,571.43 449,764.43 502,160.24 450,418.54 502,890.55
2 Asphalt Distribution Unit/Jam 276,285 355,000 277,032.72 355,960.51 277,414.63 356,451.23 277,422.36 356,461.15 277,055.95 355,990.36 276,660.20 355,481.86 276,600.31 355,404.90 276,925.02 355,822.12 277,327.76 356,339.61
3 Asphalt Finisher Unit/Jam 202,927 962,000 203,475.76 964,602.84 203,756.27 965,932.63 203,761.94 965,959.52 203,492.82 964,683.73 203,202.15 963,305.76 203,158.16 963,097.23 203,396.65 964,227.84 203,692.46 965,630.15
4 Asphalt Liquid Mixer Unit/Jam 72,406 132,000 72,601.68 132,357.15 72,701.77 132,539.61 72,703.79 132,543.30 72,607.77 132,368.25 72,504.05 132,179.17 72,488.36 132,150.56 72,573.45 132,305.69 72,679.00 132,498.11
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 97,176 97,176 97,439.09 97,439.09 97,573.42 97,573.42 97,576.14 97,576.14 97,447.27 97,447.27 97,308.07 97,308.07 97,287.01 97,287.01 97,401.21 97,401.21 97,542.87 97,542.87
6 Asphalt Mixing Plant Unit/Jam 1,086,087 5,571,000 1,089,025.17 5,586,073.19 1,090,526.49 5,593,774.09 1,090,556.85 5,593,929.81 1,089,116.50 5,586,541.63 1,087,560.79 5,578,561.75 1,087,325.36 5,577,354.13 1,088,601.80 5,583,901.54 1,090,185.00 5,592,022.43
7 Asphalt Sprayer Unit/Jam 89,555 89,555 89,796.81 89,796.81 89,920.61 89,920.61 89,923.11 89,923.11 89,804.34 89,804.34 89,676.07 89,676.07 89,656.65 89,656.65 89,761.90 89,761.90 89,892.45 89,892.45
8 Asphalt Tanker Unit/Jam 419,191 486,000 420,325.51 487,314.95 420,904.96 487,986.75 420,916.68 488,000.34 420,360.75 487,355.81 419,760.30 486,659.67 419,669.44 486,554.32 420,162.10 487,125.50 420,773.16 487,833.94
9 Blending Equipment Unit/Jam 136,237 215,000 136,605.79 215,581.72 136,794.11 215,878.91 136,797.92 215,884.92 136,617.24 215,599.79 136,422.10 215,291.83 136,392.57 215,245.22 136,552.68 215,497.91 136,751.28 215,811.31
10 Bore Pile Machine Unit/Jam 375,367 653,000 376,382.38 654,766.79 376,901.26 655,669.45 376,911.75 655,687.70 376,413.95 654,821.70 375,876.27 653,886.34 375,794.91 653,744.79 376,236.06 654,512.24 376,783.24 655,464.13
11 Bore Pile Machine Dia 60 Unit/Jam 245,799 743,000 246,463.59 745,010.30 246,803.36 746,037.36 246,810.23 746,058.13 246,484.26 745,072.78 246,132.18 744,008.50 246,078.90 743,847.45 246,367.78 744,720.67 246,726.08 745,803.75
12 Bore Pile Machine Dia 80 Unit/Jam 971,762 971,762 974,390.95 974,390.95 975,734.23 975,734.23 975,761.39 975,761.39 974,472.66 974,472.66 973,080.71 973,080.71 972,870.06 972,870.06 974,012.14 974,012.14 975,428.68 975,428.68
13 Bulldozer 100-150 HP Unit/Jam 381,083 553,000 382,114.10 554,496.23 382,640.87 555,260.65 382,651.53 555,276.11 382,146.14 554,542.73 381,600.28 553,750.61 381,517.67 553,630.74 381,965.54 554,280.66 382,521.05 555,086.77
14 Cement Tanker Unit/Jam 354,407 457,000 355,366.11 458,236.48 355,856.01 458,868.20 355,865.92 458,880.98 355,395.91 458,274.91 354,888.26 457,620.30 354,811.43 457,521.24 355,227.96 458,058.34 355,744.58 458,724.51
15 Cold Milling Unit/Jam 553,523 1,178,000 555,020.72 1,181,187.26 555,785.87 1,182,815.63 555,801.34 1,182,848.56 555,067.27 1,181,286.31 554,274.40 1,179,598.95 554,154.42 1,179,343.59 554,804.95 1,180,728.06 555,611.83 1,182,445.24
16 Cold Recycler Unit/Jam 4,661,598 4,661,598 4,674,210.68 4,674,210.68 4,680,654.50 4,680,654.50 4,680,784.79 4,680,784.79 4,674,602.65 4,674,602.65 4,667,925.39 4,667,925.39 4,666,914.90 4,666,914.90 4,672,393.53 4,672,393.53 4,679,188.77 4,679,188.77
17 Compressor 4000-6500 L\M Unit/Jam 141,953 141,953 142,337.50 142,337.50 142,533.73 142,533.73 142,537.69 142,537.69 142,349.44 142,349.44 142,146.10 142,146.10 142,115.33 142,115.33 142,282.17 142,282.17 142,489.09 142,489.09
18 Concrete Breaker Unit/Jam 517,320 986,000 518,719.89 988,667.77 519,434.99 990,030.74 519,449.45 990,058.30 518,763.38 988,750.68 518,022.38 987,338.34 517,910.24 987,124.60 518,518.23 988,283.42 519,272.33 989,720.72
19 Concrete Mixer (350) Unit/Jam 96,223 96,223 96,483.81 96,483.81 96,616.82 96,616.82 96,619.51 96,619.51 96,491.90 96,491.90 96,354.07 96,354.07 96,333.21 96,333.21 96,446.30 96,446.30 96,586.57 96,586.57
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 109,561 109,561 109,857.80 109,857.80 110,009.25 110,009.25 110,012.31 110,012.31 109,867.02 109,867.02 109,710.08 109,710.08 109,686.33 109,686.33 109,815.09 109,815.09 109,974.80 109,974.80
21 Concrete Pan Mixer Unit/Jam 291,529 624,000 292,317.28 625,688.33 292,720.27 626,550.89 292,728.42 626,568.34 292,341.80 625,740.80 291,924.21 624,846.98 291,861.02 624,711.72 292,203.64 625,445.08 292,628.61 626,354.69
22 Concrete Pump Unit/Jam 221,981 238,000 222,581.46 238,643.95 222,888.31 238,972.94 222,894.51 238,979.59 222,600.13 238,663.96 222,282.16 238,323.05 222,234.04 238,271.46 222,494.93 238,551.17 222,818.51 238,898.10
23 Concrete Vibrator Unit/Jam 82,886 82,886 83,109.82 83,109.82 83,224.39 83,224.39 83,226.71 83,226.71 83,116.79 83,116.79 82,998.06 82,998.06 82,980.09 82,980.09 83,077.51 83,077.51 83,198.33 83,198.33
24 Crane 10-15 Ton Unit/Jam 297,245 297,245 298,049.00 298,049.00 298,459.88 298,459.88 298,468.19 298,468.19 298,073.99 298,073.99 297,648.22 297,648.22 297,583.78 297,583.78 297,933.12 297,933.12 298,366.42 298,366.42
25 Crane On Track 35 Ton Unit/Jam 246,751 469,000 247,418.88 470,268.95 247,759.97 470,917.26 247,766.86 470,930.37 247,439.63 470,308.39 247,086.18 469,636.59 247,032.69 469,534.93 247,322.69 470,086.13 247,682.38 470,769.79
26 Crane On Track 75-100 Ton Unit/Jam 387,752 588,000 388,801.09 589,590.92 389,337.09 590,403.73 389,347.93 590,420.16 388,833.70 589,640.37 388,278.28 588,798.12 388,194.23 588,670.66 388,649.94 589,361.71 389,215.17 590,218.85
27 Dump Truck 10 Ton Unit/Jam 366,792 394,000 367,784.82 395,066.03 368,291.84 395,610.66 368,302.09 395,621.67 367,815.66 395,099.16 367,290.27 394,534.79 367,210.76 394,449.39 367,641.84 394,912.44 368,176.51 395,486.78
28 Dump Truck 3-4 M3 Unit/Jam 200,069 262,000 200,609.90 262,708.88 200,886.46 263,071.05 200,892.05 263,078.37 200,626.72 262,730.91 200,340.15 262,355.62 200,296.78 262,298.83 200,531.91 262,606.75 200,823.55 262,988.67
29 Excavator 80-140 HP Unit/Jam 289,623 460,000 290,406.71 461,244.60 290,807.06 461,880.47 290,815.16 461,893.32 290,431.07 461,283.28 290,016.21 460,624.38 289,953.43 460,524.66 290,293.81 461,065.29 290,716.00 461,735.83
30 Flat Bed Truck 3-4 M3 Unit/Jam 351,549 470,000 352,500.25 471,271.66 352,986.21 471,921.35 352,996.03 471,934.48 352,529.81 471,311.18 352,026.26 470,637.95 351,950.05 470,536.07 352,363.22 471,088.44 352,875.67 471,773.57
31 Fulvi Mixer Unit/Jam 880,302 1,375,000 882,683.56 1,378,720.27 883,900.42 1,380,620.96 883,925.03 1,380,659.39 882,757.58 1,378,835.89 881,496.64 1,376,866.34 881,305.82 1,376,568.29 882,340.41 1,378,184.28 883,623.63 1,380,188.63
32 Generator Set Unit/Jam 391,563 415,000 392,622.23 416,122.85 393,163.50 416,696.51 393,174.44 416,708.11 392,655.16 416,157.74 392,094.28 415,563.30 392,009.41 415,473.34 392,469.60 415,961.07 393,040.38 416,566.02
33 Hot Recycler Unit/Jam 2,876,224 8,434,000 2,884,006.14 8,456,819.48 2,887,982.00 8,468,477.95 2,888,062.39 8,468,713.70 2,884,247.99 8,457,528.66 2,880,128.09 8,445,447.81 2,879,504.62 8,443,619.59 2,882,884.95 8,453,531.79 2,887,077.64 8,465,826.10
34 Jack Hammer Unit/Jam 54,304 54,304 54,451.26 54,451.26 54,526.32 54,526.32 54,527.84 54,527.84 54,455.82 54,455.82 54,378.04 54,378.04 54,366.27 54,366.27 54,430.09 54,430.09 54,509.25 54,509.25
35 Launching Gantry Unit/Jam 69,108,453 69,108,453 69,295,436.07 69,295,436.07 69,390,965.96 69,390,965.96 69,392,897.63 69,392,897.63 69,301,247.08 69,301,247.08 69,202,256.27 69,202,256.27 69,187,275.75 69,187,275.75 69,268,496.63 69,268,496.63 69,369,236.56 69,369,236.56
36 Motor Grader > 100 HP Unit/Jam 271,522 456,000 272,256.29 457,233.78 272,631.62 457,864.12 272,639.21 457,876.86 272,279.12 457,272.12 271,890.20 456,618.95 271,831.34 456,520.10 272,150.45 457,056.02 272,546.25 457,720.74
37 Pedestrian Roller Unit/Jam 89,555 89,555 89,796.81 89,796.81 89,920.61 89,920.61 89,923.11 89,923.11 89,804.34 89,804.34 89,676.07 89,676.07 89,656.65 89,656.65 89,761.90 89,761.90 89,892.45 89,892.45
38 Pile Driver + Hammer Unit/Jam 101,940 298,000 102,215.52 298,806.28 102,356.43 299,218.22 102,359.28 299,226.55 102,224.09 298,831.34 102,078.07 298,404.49 102,055.98 298,339.89 102,175.78 298,690.12 102,324.38 299,124.52
39 Rock Drill Breaker Unit/Jam 99,082 322,000 99,349.67 322,871.22 99,486.63 323,316.33 99,489.40 323,325.33 99,358.00 322,898.30 99,216.07 322,437.06 99,194.59 322,367.26 99,311.04 322,745.70 99,455.47 323,215.08
40 Split Form Paver Unit/Jam 209,596 209,596 210,162.75 210,162.75 210,452.48 210,452.48 210,458.34 210,458.34 210,180.38 210,180.38 209,880.15 209,880.15 209,834.72 209,834.72 210,081.05 210,081.05 210,386.58 210,386.58
41 Stone Crusher Unit/Jam 561,145 699,000 562,663.01 700,891.25 563,438.69 701,857.49 563,454.37 701,877.03 562,710.19 700,950.03 561,906.41 699,948.78 561,784.77 699,797.26 562,444.26 700,618.77 563,262.25 701,637.71
42 Tamper Unit/Jam 83,838 83,838 84,065.10 84,065.10 84,180.99 84,180.99 84,183.34 84,183.34 84,072.15 84,072.15 83,952.06 83,952.06 83,933.89 83,933.89 84,032.42 84,032.42 84,154.63 84,154.63
43 Tandem Roller 6-8 T Unit/Jam 404,901 473,000 405,996.23 474,279.77 406,555.93 474,933.61 406,567.25 474,946.83 406,030.27 474,319.55 405,450.29 473,642.02 405,362.52 473,539.49 405,838.39 474,095.39 406,428.62 474,784.89
44 Three Wheel Roller 6-8 T Unit/Jam 134,332 170,000 134,695.22 170,459.96 134,880.91 170,694.96 134,884.66 170,699.71 134,706.51 170,474.26 134,514.10 170,230.75 134,484.98 170,193.90 134,642.85 170,393.69 134,838.67 170,641.50
45 Tire Roller 8-10 T Unit/Jam 240,082 433,000 240,731.88 434,171.55 241,063.75 434,770.09 241,070.46 434,782.19 240,752.07 434,207.96 240,408.17 433,587.73 240,356.13 433,493.87 240,638.29 434,002.76 240,988.26 434,633.95
46 Track Loader 75-100 HP Unit/Jam 224,839 296,000 225,447.32 296,800.87 225,758.12 297,210.04 225,764.40 297,218.31 225,466.22 296,825.76 225,144.16 296,401.77 225,095.43 296,337.61 225,359.67 296,685.49 225,687.42 297,116.97
47 Trailer 20 Ton Unit/Jam 362,982 502,000 363,963.68 503,358.24 364,465.43 504,052.16 364,475.58 504,066.19 363,994.20 503,400.45 363,474.26 502,681.39 363,395.58 502,572.57 363,822.18 503,162.55 364,351.30 503,894.32
48 Trailler 15 Ton Unit/Jam 314,393 478,000 315,244.13 479,293.30 315,678.72 479,954.05 315,687.51 479,967.41 315,270.57 479,333.50 314,820.23 478,648.81 314,752.08 478,545.19 315,121.57 479,106.97 315,579.87 479,803.76
49 Truck Mixer (agitator) Unit/Jam 395,374 581,000 396,443.37 582,571.98 396,989.91 583,375.11 397,000.96 583,391.35 396,476.62 582,620.84 395,910.29 581,788.61 395,824.58 581,662.67 396,289.25 582,345.50 396,865.59 583,192.43
50 Vibrating Rammer Unit/Jam 80,980 80,980 81,199.25 81,199.25 81,311.19 81,311.19 81,313.45 81,313.45 81,206.05 81,206.05 81,090.06 81,090.06 81,072.50 81,072.50 81,167.68 81,167.68 81,285.72 81,285.72
51 Vibratory Roller 5-8 T Unit/Jam 195,305 419,000 195,833.47 420,133.67 196,103.45 420,712.86 196,108.91 420,724.57 195,849.90 420,168.90 195,570.14 419,568.73 195,527.81 419,477.90 195,757.34 419,970.34 196,042.04 420,581.12
52 Water Pump 70-100 MM Unit/Jam 60,973 60,973 61,138.26 61,138.26 61,222.54 61,222.54 61,224.24 61,224.24 61,143.38 61,143.38 61,056.04 61,056.04 61,042.83 61,042.83 61,114.49 61,114.49 61,203.37 61,203.37
53 Water Tanker 3000-4500 L Unit/Jam 221,028 221,028 221,626.18 221,626.18 221,931.71 221,931.71 221,937.89 221,937.89 221,644.76 221,644.76 221,328.16 221,328.16 221,280.25 221,280.25 221,540.02 221,540.02 221,862.21 221,862.21
54 Welding Set Unit/Jam 123,852 123,852 124,187.08 124,187.08 124,358.28 124,358.28 124,361.75 124,361.75 124,197.50 124,197.50 124,020.09 124,020.09 123,993.24 123,993.24 124,138.80 124,138.80 124,319.34 124,319.34
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 215,312 343,000 215,894.46 343,928.04 216,192.09 344,402.17 216,198.11 344,411.76 215,912.57 343,956.88 215,604.16 343,465.57 215,557.48 343,391.22 215,810.53 343,794.33 216,124.39 344,294.33
HARGA SATUAN DASAR BAHAN KABUPATEN NGAWI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 234,000 234,000 234,633.12 234,633.12 234,956.59 234,956.59 234,963.13 234,963.13 234,652.80 234,652.80 234,317.62 234,317.62 234,266.89 234,266.89 234,541.91 234,541.91 234,883.01 234,883.01
2 Agregat Pecah Mesin 20-30 mm M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 328,000 328,000 328,887.45 328,887.45 329,340.85 329,340.85 329,350.02 329,350.02 328,915.03 328,915.03 328,445.21 328,445.21 328,374.11 328,374.11 328,759.60 328,759.60 329,237.72 329,237.72
4 Bahan Agr. Base Kelas A M3 314,000 314,000 314,849.58 314,849.58 315,283.62 315,283.62 315,292.40 315,292.40 314,875.98 314,875.98 314,426.20 314,426.20 314,358.14 314,358.14 314,727.17 314,727.17 315,184.89 315,184.89
5 Bahan Agr. Base Kelas B M3 295,000 295,000 295,798.17 295,798.17 296,205.95 296,205.95 296,214.20 296,214.20 295,822.97 295,822.97 295,400.42 295,400.42 295,336.47 295,336.47 295,683.17 295,683.17 296,113.20 296,113.20
6 Bahan Agr. Base Kelas C M3 272,000 272,000 272,735.94 272,735.94 273,111.93 273,111.93 273,119.53 273,119.53 272,758.81 272,758.81 272,369.20 272,369.20 272,310.24 272,310.24 272,629.91 272,629.91 273,026.40 273,026.40
7 Bahan Agr. Base Kelas C2 M3 248,000 248,000 248,671.00 248,671.00 249,013.82 249,013.82 249,020.75 249,020.75 248,691.86 248,691.86 248,336.62 248,336.62 248,282.86 248,282.86 248,574.33 248,574.33 248,935.84 248,935.84
8 Bahan Agr. Base Kelas S M3 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
9 Bahan Pilihan M3 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
10 Bahan Tanah Timbunan M3 114,000 114,000 114,308.44 114,308.44 114,466.03 114,466.03 114,469.22 114,469.22 114,318.03 114,318.03 114,154.74 114,154.74 114,130.03 114,130.03 114,264.01 114,264.01 114,430.18 114,430.18
11 Batu Belah/Kerakal M3 323,000 323,000 323,873.93 323,873.93 324,320.41 324,320.41 324,329.44 324,329.44 323,901.09 323,901.09 323,438.42 323,438.42 323,368.40 323,368.40 323,748.02 323,748.02 324,218.86 324,218.86
12 Batu Kali M3 356,000 356,000 356,963.21 356,963.21 357,455.32 357,455.32 357,465.27 357,465.27 356,993.15 356,993.15 356,483.21 356,483.21 356,406.04 356,406.04 356,824.44 356,824.44 357,343.38 357,343.38
13 Chipping M3 212,000 212,000 212,573.60 212,573.60 212,866.65 212,866.65 212,872.58 212,872.58 212,591.42 212,591.42 212,287.76 212,287.76 212,241.80 212,241.80 212,490.96 212,490.96 212,799.99 212,799.99
14 Chipping (kg) Kg 303 303 303.82 303.82 304.24 304.24 304.25 304.25 303.85 303.85 303.41 303.41 303.35 303.35 303.70 303.70 304.14 304.14
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 380,000 380,000 381,028.15 381,028.15 381,553.43 381,553.43 381,564.05 381,564.05 381,060.10 381,060.10 380,515.79 380,515.79 380,433.42 380,433.42 380,880.02 380,880.02 381,433.95 381,433.95
18 Kapur M3 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35 95,220.00 95,220.00 95,358.49 95,358.49
19 Pasir Beton (Kasar) M3 453,000 453,000 454,225.66 454,225.66 454,851.85 454,851.85 454,864.51 454,864.51 454,263.75 454,263.75 453,614.88 453,614.88 453,516.68 453,516.68 454,049.08 454,049.08 454,709.42 454,709.42
20 Pasir Halus (untuk HRS) M3 286,000 286,000 286,773.82 286,773.82 287,169.16 287,169.16 287,177.15 287,177.15 286,797.87 286,797.87 286,388.20 286,388.20 286,326.20 286,326.20 286,662.33 286,662.33 287,079.23 287,079.23
21 Pasir Pasang (Sedang) M3 320,000 320,000 320,865.81 320,865.81 321,308.15 321,308.15 321,317.10 321,317.10 320,892.72 320,892.72 320,434.35 320,434.35 320,364.98 320,364.98 320,741.07 320,741.07 321,207.54 321,207.54
22 Pasir Urug M3 194,000 194,000 194,524.90 194,524.90 194,793.07 194,793.07 194,798.49 194,798.49 194,541.21 194,541.21 194,263.32 194,263.32 194,221.27 194,221.27 194,449.27 194,449.27 194,732.07 194,732.07
23 Pasir Urug (ada unsur lempung) M3 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
24 Sirtu M3 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
26 Anti Pengelupas Liter 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
27 Arbocell Kg 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 562,097 562,097 563,618.29 563,618.29 564,395.29 564,395.29 564,411.00 564,411.00 563,665.56 563,665.56 562,860.41 562,860.41 562,738.56 562,738.56 563,399.18 563,399.18 564,218.55 564,218.55
41 Beton K-125 (fc' 10 MPa) M3 581,152 581,152 582,724.00 582,724.00 583,527.33 583,527.33 583,543.58 583,543.58 582,772.86 582,772.86 581,940.42 581,940.42 581,814.45 581,814.45 582,497.46 582,497.46 583,344.61 583,344.61
42 Beton K-175 (fc' 15 MPa) M3 628,787 628,787 630,488.26 630,488.26 631,357.44 631,357.44 631,375.02 631,375.02 630,541.13 630,541.13 629,640.46 629,640.46 629,504.16 629,504.16 630,243.15 630,243.15 631,159.74 631,159.74
43 Beton K-250 (fc' 20 MPa) M3 700,240 700,240 702,134.65 702,134.65 703,102.61 703,102.61 703,122.18 703,122.18 702,193.53 702,193.53 701,190.51 701,190.51 701,038.72 701,038.72 701,861.69 701,861.69 702,882.43 702,882.43
44 Beton K-300 (fc' 25 MPa) M3 728,821 728,821 730,793.21 730,793.21 731,800.67 731,800.67 731,821.04 731,821.04 730,854.49 730,854.49 729,810.53 729,810.53 729,652.54 729,652.54 730,509.10 730,509.10 731,571.51 731,571.51
45 Beton K-350 (fc' 30 MPa) M3 757,402 757,402 759,451.77 759,451.77 760,498.74 760,498.74 760,519.91 760,519.91 759,515.45 759,515.45 758,430.55 758,430.55 758,266.37 758,266.37 759,156.52 759,156.52 760,260.59 760,260.59
46 Beton K-400 (fc' 35 MPa) M3 785,984 785,984 788,110.32 788,110.32 789,196.80 789,196.80 789,218.77 789,218.77 788,176.41 788,176.41 787,050.57 787,050.57 786,880.20 786,880.20 787,803.94 787,803.94 788,949.67 788,949.67
47 Beton K-450 (fc' 40 MPa) M3 824,092 824,092 826,321.73 826,321.73 827,460.89 827,460.89 827,483.93 827,483.93 826,391.03 826,391.03 825,210.60 825,210.60 825,031.96 825,031.96 826,000.49 826,000.49 827,201.78 827,201.78
48 Beton K-500 (fc' 45 MPa) M3 857,437 857,437 859,756.72 859,756.72 860,941.97 860,941.97 860,965.93 860,965.93 859,828.81 859,828.81 858,600.62 858,600.62 858,414.76 858,414.76 859,422.48 859,422.48 860,672.37 860,672.37
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
51 Cat Anti Karat Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
52 Cat Marka (Non Thermoplas) Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
53 Cat Marka (Thermoplastic) Kg 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,457,000 1,457,000 1,460,942.14 1,460,942.14 1,462,956.17 1,462,956.17 1,462,996.90 1,462,996.90 1,461,064.65 1,461,064.65 1,458,977.65 1,458,977.65 1,458,661.81 1,458,661.81 1,460,374.18 1,460,374.18 1,462,498.06 1,462,498.06
57 Curing Compound Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 581,000 581,000 582,571.98 582,571.98 583,375.11 583,375.11 583,391.35 583,391.35 582,620.84 582,620.84 581,788.61 581,788.61 581,662.67 581,662.67 582,345.50 582,345.50 583,192.43 583,192.43
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 676,000 676,000 677,829.02 677,829.02 678,763.47 678,763.47 678,782.36 678,782.36 677,885.86 677,885.86 676,917.56 676,917.56 676,771.03 676,771.03 677,565.51 677,565.51 678,550.92 678,550.92
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 857,000 857,000 859,318.74 859,318.74 860,503.39 860,503.39 860,527.35 860,527.35 859,390.81 859,390.81 858,163.24 858,163.24 857,977.47 857,977.47 858,984.67 858,984.67 860,233.93 860,233.93
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
64 Oxygen (Isi 6 M3) Botol 163,000 163,000 163,441.02 163,441.02 163,666.34 163,666.34 163,670.90 163,670.90 163,454.73 163,454.73 163,221.25 163,221.25 163,185.91 163,185.91 163,377.48 163,377.48 163,615.09 163,615.09
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,315,000 1,315,000 1,318,557.93 1,318,557.93 1,320,375.68 1,320,375.68 1,320,412.44 1,320,412.44 1,318,668.51 1,318,668.51 1,316,784.90 1,316,784.90 1,316,499.85 1,316,499.85 1,318,045.33 1,318,045.33 1,319,962.21 1,319,962.21
67 Seal Coat M2 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
68 Seal Guard Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
69 Semen/PC (50 kg) Zak 69,000 69,000 69,186.69 69,186.69 69,282.07 69,282.07 69,284.00 69,284.00 69,192.49 69,192.49 69,093.66 69,093.66 69,078.70 69,078.70 69,159.79 69,159.79 69,260.37 69,260.37
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 11,000 9,000 11,029.76 9,024.35 11,044.97 9,036.79 11,045.28 9,037.04 11,030.69 9,025.11 11,014.93 9,012.22 11,012.55 9,010.27 11,025.47 9,020.84 11,041.51 9,033.96
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 10,000 11,000 10,027.06 11,029.76 10,040.88 11,044.97 10,041.16 11,045.28 10,027.90 11,030.69 10,013.57 11,014.93 10,011.41 11,012.55 10,023.16 11,025.47 10,037.74 11,041.51
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,385,000 12,385,000 12,418,509.52 12,418,509.52 12,435,629.53 12,435,629.53 12,435,975.71 12,435,975.71 12,419,550.91 12,419,550.91 12,401,810.66 12,401,810.66 12,399,125.99 12,399,125.99 12,413,681.67 12,413,681.67 12,431,735.38 12,431,735.38
87 Box Culvert Type DUB 200×200 M' 13,147,000 13,147,000 13,182,571.22 13,182,571.22 13,200,744.56 13,200,744.56 13,201,112.04 13,201,112.04 13,183,676.70 13,183,676.70 13,164,844.96 13,164,844.96 13,161,995.11 13,161,995.11 13,177,446.34 13,177,446.34 13,196,610.82 13,196,610.82
88 Box Culvert Type uk 300×200 M' 14,195,000 14,195,000 14,233,406.75 14,233,406.75 14,253,028.76 14,253,028.76 14,253,425.53 14,253,425.53 14,234,600.34 14,234,600.34 14,214,267.45 14,214,267.45 14,211,190.43 14,211,190.43 14,227,873.34 14,227,873.34 14,248,565.50 14,248,565.50
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
91 Ducting (Strand Prestress) M' 161,000 161,000 161,435.61 161,435.61 161,658.16 161,658.16 161,662.66 161,662.66 161,449.15 161,449.15 161,218.53 161,218.53 161,183.63 161,183.63 161,372.85 161,372.85 161,607.54 161,607.54
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,073,000 2,073,000 2,078,608.82 2,078,608.82 2,081,474.37 2,081,474.37 2,081,532.31 2,081,532.31 2,078,783.13 2,078,783.13 2,075,813.77 2,075,813.77 2,075,364.41 2,075,364.41 2,077,800.74 2,077,800.74 2,080,822.56 2,080,822.56
94 Expansion Join Tipe Rubber M' 1,501,000 1,501,000 1,505,061.19 1,505,061.19 1,507,136.05 1,507,136.05 1,507,178.00 1,507,178.00 1,505,187.40 1,505,187.40 1,503,037.37 1,503,037.37 1,502,712.00 1,502,712.00 1,504,476.07 1,504,476.07 1,506,664.09 1,506,664.09
95 Expansion Join Tipe Torma M' 1,721,000 1,721,000 1,725,656.43 1,725,656.43 1,728,035.40 1,728,035.40 1,728,083.50 1,728,083.50 1,725,801.14 1,725,801.14 1,723,335.98 1,723,335.98 1,722,962.93 1,722,962.93 1,724,985.56 1,724,985.56 1,727,494.27 1,727,494.27
96 Expansion Tipe Joint Asphaltic Plug M' 2,042,000 2,042,000 2,047,524.94 2,047,524.94 2,050,347.64 2,050,347.64 2,050,404.71 2,050,404.71 2,047,696.65 2,047,696.65 2,044,771.69 2,044,771.69 2,044,329.05 2,044,329.05 2,046,728.94 2,046,728.94 2,049,705.58 2,049,705.58
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
99 Glass Bead Kg 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
100 Joint Sealent Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
101 Joint Socket Pile 16×16×16 Set 87,000 87,000 87,235.39 87,235.39 87,355.65 87,355.65 87,358.09 87,358.09 87,242.71 87,242.71 87,118.09 87,118.09 87,099.23 87,099.23 87,201.48 87,201.48 87,328.30 87,328.30
102 Joint Socket Pile 35×35 Set 745,000 745,000 747,015.71 747,015.71 748,045.54 748,045.54 748,066.36 748,066.36 747,078.36 747,078.36 746,011.22 746,011.22 745,849.73 745,849.73 746,725.30 746,725.30 747,811.29 747,811.29
103 Kawat Beton Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
104 Kawat Bronjong Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
105 Kawat Las Dos 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
106 Kayu Acuan (Kelas III/Meranti) M3 4,097,000 4,097,000 4,108,085.06 4,108,085.06 4,113,748.42 4,113,748.42 4,113,862.94 4,113,862.94 4,108,429.56 4,108,429.56 4,102,561.02 4,102,561.02 4,101,672.93 4,101,672.93 4,106,487.99 4,106,487.99 4,112,460.22 4,112,460.22
107 Kayu Perancah (Gelam) M3 2,639,000 2,639,000 2,646,140.22 2,646,140.22 2,649,788.16 2,649,788.16 2,649,861.92 2,649,861.92 2,646,362.12 2,646,362.12 2,642,582.02 2,642,582.02 2,642,009.97 2,642,009.97 2,645,111.50 2,645,111.50 2,648,958.39 2,648,958.39
108 Kerb Pracetak Type 1 (Peninggi) Buah 52,000 52,000 52,140.69 52,140.69 52,212.57 52,212.57 52,214.03 52,214.03 52,145.07 52,145.07 52,070.58 52,070.58 52,059.31 52,059.31 52,120.42 52,120.42 52,196.22 52,196.22
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
110 Marmer Nama Jembatan Buah 572,000 572,000 573,547.63 573,547.63 574,338.32 574,338.32 574,354.31 574,354.31 573,595.73 573,595.73 572,776.40 572,776.40 572,652.41 572,652.41 573,324.66 573,324.66 574,158.47 574,158.47
111 Mata Kucing Buah 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
112 Matras Concrete (Tebal=10 cm) M2 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
113 Mini Pile 16×16×16 M' 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
114 Mini Timber Pile Buah 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
115 Multipleks 12 mm Lbr 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 63,334,000 63,334,000 63,505,359.85 63,505,359.85 63,592,907.60 63,592,907.60 63,594,677.87 63,594,677.87 63,510,685.31 63,510,685.31 63,419,965.82 63,419,965.82 63,406,237.01 63,406,237.01 63,480,671.37 63,480,671.37 63,572,993.84 63,572,993.84
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 89,724,000 89,724,000 89,966,762.04 89,966,762.04 90,090,789.18 90,090,789.18 90,093,297.08 90,093,297.08 89,974,306.52 89,974,306.52 89,845,786.04 89,845,786.04 89,826,336.72 89,826,336.72 89,931,786.38 89,931,786.38 90,062,577.75 90,062,577.75
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 171,487,000 171,487,000 171,950,984.37 171,950,984.37 172,188,034.01 172,188,034.01 172,192,827.30 172,192,827.30 171,965,403.93 171,965,403.93 171,719,766.29 171,719,766.29 171,682,593.34 171,682,593.34 171,884,136.36 171,884,136.36 172,134,114.29 172,134,114.29
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 224,879,000 224,879,000 225,487,444.61 225,487,444.61 225,798,299.00 225,798,299.00 225,804,584.66 225,804,584.66 225,506,353.66 225,506,353.66 225,184,237.42 225,184,237.42 225,135,490.79 225,135,490.79 225,399,783.66 225,399,783.66 225,727,591.52 225,727,591.52
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 286,661,000 286,661,000 287,436,605.28 287,436,605.28 287,832,862.07 287,832,862.07 287,840,874.62 287,840,874.62 287,460,709.29 287,460,709.29 287,050,096.65 287,050,096.65 286,987,957.63 286,987,957.63 287,324,860.85 287,324,860.85 287,742,728.81 287,742,728.81
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 345,856,000 345,856,000 346,791,766.43 346,791,766.43 347,269,849.56 347,269,849.56 347,279,516.69 347,279,516.69 346,820,847.88 346,820,847.88 346,325,444.43 346,325,444.43 346,250,473.82 346,250,473.82 346,656,946.96 346,656,946.96 347,161,103.94 347,161,103.94
124 Pelat Rambu (Eng. Grade) Buah 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
125 Pelat Rambu (High L Grade) Buah 233,000 233,000 233,630.42 233,630.42 233,952.50 233,952.50 233,959.01 233,959.01 233,650.01 233,650.01 233,316.26 233,316.26 233,265.75 233,265.75 233,539.59 233,539.59 233,879.24 233,879.24
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 262,000 262,000 262,708.88 262,708.88 263,071.05 263,071.05 263,078.37 263,078.37 262,730.91 262,730.91 262,355.62 262,355.62 262,298.83 262,298.83 262,606.75 262,606.75 262,988.67 262,988.67
129 Pipa Galvanis Dia 1,5" M' 104,000 104,000 104,281.39 104,281.39 104,425.15 104,425.15 104,428.06 104,428.06 104,290.13 104,290.13 104,141.16 104,141.16 104,118.62 104,118.62 104,240.85 104,240.85 104,392.45 104,392.45
130 Pipa Galvanis Dia 2" M' 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
131 Pipa Galvanis Dia 3" M' 230,000 230,000 230,622.30 230,622.30 230,940.23 230,940.23 230,946.66 230,946.66 230,641.64 230,641.64 230,312.19 230,312.19 230,262.33 230,262.33 230,532.64 230,532.64 230,867.92 230,867.92
132 Pipa Porus M' 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
133 Pipa PVC Dia 4" M' 220,000 220,000 220,595.24 220,595.24 220,899.35 220,899.35 220,905.50 220,905.50 220,613.74 220,613.74 220,298.61 220,298.61 220,250.93 220,250.93 220,509.48 220,509.48 220,830.18 220,830.18
134 Plastik Filter M2 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
135 Rel Pengaman M' 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,957,000 1,957,000 1,962,294.96 1,962,294.96 1,965,000.16 1,965,000.16 1,965,054.86 1,965,054.86 1,962,459.52 1,962,459.52 1,959,656.32 1,959,656.32 1,959,232.10 1,959,232.10 1,961,532.10 1,961,532.10 1,964,384.83 1,964,384.83
137 Strip Bearing Buah 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
138 Tiang Pancang Baja Diameter 400 M' 693,000 693,000 694,875.02 694,875.02 695,832.96 695,832.96 695,852.33 695,852.33 694,933.29 694,933.29 693,940.64 693,940.64 693,790.42 693,790.42 694,604.88 694,604.88 695,615.07 695,615.07
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 847,000 847,000 849,291.69 849,291.69 850,462.51 850,462.51 850,486.19 850,486.19 849,362.91 849,362.91 848,149.67 848,149.67 847,966.06 847,966.06 848,961.52 848,961.52 850,196.19 850,196.19
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,772,000 1,772,000 1,776,794.42 1,776,794.42 1,779,243.89 1,779,243.89 1,779,293.42 1,779,293.42 1,776,943.42 1,776,943.42 1,774,405.21 1,774,405.21 1,774,021.09 1,774,021.09 1,776,103.67 1,776,103.67 1,778,686.73 1,778,686.73
HARGA SATUAN DASAR UPAH KABUPATEN NGAWI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 114,474.83 114,474.83 114,359.13 114,359.13 114,192.78 114,192.78 114,130.01 114,130.01 114,226.68 114,226.68 114,390.66 114,390.66 114,469.56 114,469.56 114,295.05 114,295.05
2 Tukang OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
3 Mandor OH 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 148,383.05
4 Operator OH 306,270.37 306,270.37 305,960.84 305,960.84 305,515.76 305,515.76 305,347.84 305,347.84 305,606.47 305,606.47 306,045.17 306,045.17 306,256.27 306,256.27 305,789.39 305,789.39
5 Pembantu Operator OH 191,795.54 191,795.54 191,601.70 191,601.70 191,322.99 191,322.99 191,217.83 191,217.83 191,379.79 191,379.79 191,654.52 191,654.52 191,786.71 191,786.71 191,494.34 191,494.34
6 Sopir OH 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 143,370.11
7 Pembantu Sopir OH 124,516.48 124,516.48 124,390.64 124,390.64 124,209.69 124,209.69 124,141.42 124,141.42 124,246.57 124,246.57 124,424.92 124,424.92 124,510.75 124,510.75 124,320.93 124,320.93
8 Mekanik OH 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 171,442.58
9 Pembantu Mekanik OH 124,516.48 124,516.48 124,390.64 124,390.64 124,209.69 124,209.69 124,141.42 124,141.42 124,246.57 124,246.57 124,424.92 124,424.92 124,510.75 124,510.75 124,320.93 124,320.93
10 Kepala Tukang OH 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 143,370.11
11 Pemasak Aspal OH 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 143,370.11

HARGA SATUAN DASAR ALAT KABUPATEN NGAWI TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 450,594.26 503,086.74 450,138.87 502,578.29 449,484.06 501,847.20 449,237.00 501,571.37 449,617.51 501,996.21 450,262.95 502,716.83 450,573.52 503,063.58 449,886.63 914,685.22
2 Asphalt Distribution Unit/Jam 277,435.96 356,478.63 277,155.56 356,118.35 276,752.39 355,600.31 276,600.28 355,404.86 276,834.56 355,705.89 277,231.96 356,216.51 277,423.19 356,462.22 277,000.26 609,831.07
3 Asphalt Finisher Unit/Jam 203,771.93 966,006.88 203,565.98 965,030.57 203,269.86 963,626.77 203,158.14 963,097.12 203,330.21 963,912.87 203,622.10 965,296.58 203,762.55 965,962.41 203,451.92 1,150,984.01
4 Asphalt Liquid Mixer Unit/Jam 72,707.35 132,549.80 72,633.87 132,415.84 72,528.21 132,223.22 72,488.35 132,150.54 72,549.75 132,262.47 72,653.89 132,452.34 72,704.01 132,543.70 72,593.17 198,884.16
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 97,580.92 97,580.92 97,482.30 97,482.30 97,340.50 97,340.50 97,286.99 97,286.99 97,369.40 97,369.40 97,509.17 97,509.17 97,576.43 97,576.43 97,427.68 186,734.75
6 Asphalt Mixing Plant Unit/Jam 1,090,610.31 5,594,204.06 1,089,508.08 5,588,550.23 1,087,923.20 5,580,420.70 1,087,325.23 5,577,353.48 1,088,246.21 5,582,077.57 1,089,808.40 5,590,090.72 1,090,560.11 5,593,946.54 1,088,897.58 6,583,556.61
7 Asphalt Sprayer Unit/Jam 89,927.52 89,927.52 89,836.63 89,836.63 89,705.95 89,705.95 89,656.64 89,656.64 89,732.58 89,732.58 89,861.39 89,861.39 89,923.38 89,923.38 89,786.29 172,088.89
8 Asphalt Tanker Unit/Jam 420,937.31 488,024.26 420,511.89 487,531.04 419,900.18 486,821.84 419,669.39 486,554.26 420,024.85 486,966.38 420,627.81 487,665.43 420,917.94 488,001.80 420,276.26 872,504.05
9 Blending Equipment Unit/Jam 136,804.63 215,895.51 136,666.36 215,677.31 136,467.56 215,363.57 136,392.55 215,245.20 136,508.08 215,427.51 136,704.04 215,736.76 136,798.33 215,885.57 136,589.78 340,761.47
10 Bore Pile Machine Unit/Jam 376,930.23 655,719.84 376,549.28 655,057.13 376,001.53 654,104.24 375,794.86 653,744.72 376,113.16 654,298.45 376,653.08 655,237.70 376,912.88 655,689.66 376,338.29 999,660.54
11 Bore Pile Machine Dia 60 Unit/Jam 246,822.33 746,094.71 246,572.88 745,340.66 246,214.20 744,256.43 246,078.87 743,847.36 246,287.30 744,477.41 246,640.85 745,546.11 246,810.97 746,060.36 246,434.72 970,817.38
12 Bore Pile Machine Dia 80 Unit/Jam 975,809.23 975,809.23 974,823.02 974,823.02 973,404.97 973,404.97 972,869.95 972,869.95 973,693.98 973,693.98 975,091.73 975,091.73 975,764.31 975,764.31 974,276.79 1,867,347.52
13 Bulldozer 100-150 HP Unit/Jam 382,670.29 555,303.33 382,283.54 554,742.11 381,727.44 553,935.14 381,517.63 553,630.67 381,840.78 554,099.60 382,388.91 554,895.02 382,652.67 555,277.77 382,069.33 904,655.08
14 Cement Tanker Unit/Jam 355,883.37 458,903.47 355,523.69 458,439.68 355,006.52 457,772.80 354,811.39 457,521.19 355,111.92 457,908.71 355,621.69 458,566.05 355,866.98 458,882.35 355,324.47 783,890.95
15 Cold Milling Unit/Jam 555,828.59 1,182,906.55 555,266.84 1,181,711.03 554,459.10 1,179,992.03 554,154.35 1,179,343.46 554,623.73 1,180,342.38 555,419.90 1,182,036.77 555,803.00 1,182,852.10 554,955.70 1,689,748.96
16 Cold Recycler Unit/Jam 4,681,014.27 4,681,014.27 4,676,283.37 4,676,283.37 4,669,480.89 4,669,480.89 4,666,914.36 4,666,914.36 4,670,867.30 4,670,867.30 4,677,572.39 4,677,572.39 4,680,798.79 4,680,798.79 4,673,663.05 8,957,775.88
17 Compressor 4000-6500 L\M Unit/Jam 142,544.68 142,544.68 142,400.62 142,400.62 142,193.47 142,193.47 142,115.32 142,115.32 142,235.69 142,235.69 142,439.87 142,439.87 142,538.12 142,538.12 142,320.82 272,779.20
18 Concrete Breaker Unit/Jam 519,474.91 990,106.84 518,949.90 989,106.18 518,195.00 987,667.35 517,910.18 987,124.49 518,348.85 987,960.60 519,092.95 989,378.83 519,451.00 990,061.26 518,659.11 1,463,980.77
19 Concrete Mixer (350) Unit/Jam 96,624.25 96,624.25 96,526.59 96,526.59 96,386.18 96,386.18 96,333.20 96,333.20 96,414.80 96,414.80 96,553.20 96,553.20 96,619.80 96,619.80 96,472.51 184,904.02
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 110,017.71 110,017.71 109,906.52 109,906.52 109,746.64 109,746.64 109,686.32 109,686.32 109,779.22 109,779.22 109,936.81 109,936.81 110,012.64 110,012.64 109,844.93 210,534.28
21 Concrete Pan Mixer Unit/Jam 292,742.77 626,599.05 292,446.91 625,965.78 292,021.49 625,055.20 291,860.98 624,711.64 292,108.19 625,240.78 292,527.52 626,138.32 292,729.29 626,570.21 292,283.04 893,536.24
22 Concrete Pump Unit/Jam 222,905.44 238,991.31 222,680.16 238,749.77 222,356.23 238,402.46 222,234.02 238,271.43 222,422.25 238,473.25 222,741.54 238,815.58 222,895.18 238,980.30 222,555.38 442,621.36
23 Concrete Vibrator Unit/Jam 83,230.79 83,230.79 83,146.67 83,146.67 83,025.72 83,025.72 82,980.08 82,980.08 83,050.37 83,050.37 83,169.59 83,169.59 83,226.96 83,226.96 83,100.08 159,273.76
24 Crane 10-15 Ton Unit/Jam 298,482.82 298,482.82 298,181.16 298,181.16 297,747.40 297,747.40 297,583.75 297,583.75 297,835.81 297,835.81 298,263.35 298,263.35 298,469.08 298,469.08 298,014.08 571,188.65
25 Crane On Track 35 Ton Unit/Jam 247,779.01 470,953.46 247,528.59 470,477.48 247,168.52 469,793.09 247,032.66 469,534.87 247,241.90 469,932.58 247,596.82 470,607.17 247,767.60 470,931.78 247,389.89 696,983.78
26 Crane On Track 75-100 Ton Unit/Jam 389,367.02 590,449.11 388,973.50 589,852.37 388,407.67 588,994.32 388,194.18 588,670.59 388,522.99 589,169.20 389,080.72 590,014.96 389,349.09 590,421.93 388,755.54 945,874.58
27 Dump Truck 10 Ton Unit/Jam 368,320.15 395,641.07 367,947.90 395,241.21 367,412.66 394,666.26 367,210.72 394,449.34 367,521.75 394,783.44 368,049.33 395,350.16 368,303.20 395,622.86 367,741.73 732,110.16
28 Dump Truck 3-4 M3 Unit/Jam 200,901.90 263,091.27 200,698.86 262,825.37 200,406.91 262,443.05 200,296.75 262,298.80 200,466.41 262,520.97 200,754.18 262,897.82 200,892.65 263,079.16 200,586.40 446,545.61
29 Excavator 80-140 HP Unit/Jam 290,829.42 461,915.97 290,535.49 461,449.13 290,112.85 460,777.87 289,953.40 460,524.61 290,198.99 460,914.68 290,615.57 461,576.33 290,816.03 461,894.71 290,372.69 727,360.66
30 Flat Bed Truck 3-4 M3 Unit/Jam 353,013.34 471,957.62 352,656.56 471,480.63 352,143.56 470,794.78 351,950.01 470,536.01 352,248.12 470,934.56 352,753.77 471,610.60 352,997.09 471,935.90 352,458.95 794,297.91
31 Fulvi Mixer Unit/Jam 883,968.36 1,380,727.08 883,074.97 1,379,331.64 881,790.38 1,377,325.16 881,305.72 1,376,568.13 882,052.19 1,377,734.10 883,318.39 1,379,711.85 883,927.67 1,380,663.52 882,580.15 2,187,575.76
32 Generator Set Unit/Jam 393,193.72 416,728.54 392,796.33 416,307.37 392,224.94 415,701.78 392,009.36 415,473.29 392,341.40 415,825.20 392,904.61 416,422.12 393,175.62 416,709.35 392,576.23 775,929.06
33 Hot Recycler Unit/Jam 2,888,203.98 8,469,128.88 2,885,285.00 8,460,569.49 2,881,087.84 8,448,262.10 2,879,504.28 8,443,618.61 2,881,943.26 8,450,770.46 2,886,080.33 8,462,901.65 2,888,071.03 8,468,739.03 2,883,668.25 11,099,142.93
34 Jack Hammer Unit/Jam 54,530.52 54,530.52 54,475.40 54,475.40 54,396.16 54,396.16 54,366.26 54,366.26 54,412.31 54,412.31 54,490.42 54,490.42 54,528.01 54,528.01 54,444.88 104,351.77
35 Launching Gantry Unit/Jam 69,396,299.68 69,396,299.68 69,326,163.76 69,326,163.76 69,225,316.66 69,225,316.66 69,187,267.72 69,187,267.72 69,245,870.19 69,245,870.19 69,345,273.59 69,345,273.59 69,393,105.20 69,393,105.20 69,287,317.42 132,799,530.92
36 Motor Grader > 100 HP Unit/Jam 272,652.58 457,899.31 272,377.02 457,436.53 271,980.80 456,771.11 271,831.31 456,520.05 272,061.55 456,906.73 272,452.10 457,562.62 272,640.03 457,878.23 272,224.40 706,714.68
37 Pedestrian Roller Unit/Jam 89,927.52 89,927.52 89,836.63 89,836.63 89,705.95 89,705.95 89,656.64 89,656.64 89,732.58 89,732.58 89,861.39 89,861.39 89,923.38 89,923.38 89,786.29 172,088.89
38 Pile Driver + Hammer Unit/Jam 102,364.30 299,241.21 102,260.85 298,938.78 102,112.09 298,503.93 102,055.97 298,339.86 102,142.41 298,592.55 102,289.03 299,021.19 102,359.59 299,227.44 102,203.55 392,456.15
39 Rock Drill Breaker Unit/Jam 99,494.27 323,341.18 99,393.72 323,014.39 99,249.13 322,544.51 99,194.58 322,367.23 99,278.60 322,640.28 99,421.12 323,103.43 99,489.69 323,326.29 99,338.03 413,891.59
40 Split Form Paver Unit/Jam 210,468.66 210,468.66 210,255.95 210,255.95 209,950.09 209,950.09 209,834.69 209,834.69 210,012.43 210,012.43 210,313.90 210,313.90 210,458.97 210,458.97 210,138.13 402,761.23
41 Stone Crusher Unit/Jam 563,482.00 701,911.44 562,912.51 701,202.05 562,093.65 700,182.03 561,784.70 699,797.18 562,260.54 700,389.92 563,067.68 701,395.34 563,456.06 701,879.13 562,597.09 1,216,513.70
42 Tamper Unit/Jam 84,187.46 84,187.46 84,102.38 84,102.38 83,980.04 83,980.04 83,933.88 83,933.88 84,004.97 84,004.97 84,125.56 84,125.56 84,183.59 84,183.59 84,055.25 161,104.49
43 Tandem Roller 6-8 T Unit/Jam 406,587.18 474,970.12 406,176.26 474,490.08 405,585.40 473,799.85 405,362.48 473,539.44 405,705.82 473,940.53 406,288.22 474,620.88 406,568.46 474,948.25 405,948.66 846,337.01
44 Three Wheel Roller 6-8 T Unit/Jam 134,891.28 170,708.08 134,754.95 170,535.55 134,558.92 170,287.47 134,484.96 170,193.88 134,598.87 170,338.03 134,792.09 170,582.56 134,885.07 170,700.22 134,679.44 293,893.89
45 Tire Roller 8-10 T Unit/Jam 241,082.28 434,803.51 240,838.63 434,364.07 240,488.29 433,732.21 240,356.10 433,493.82 240,559.69 433,860.99 240,905.02 434,483.81 241,071.18 434,783.50 240,703.68 654,761.68
46 Track Loader 75-100 HP Unit/Jam 225,775.47 297,232.88 225,547.29 296,932.48 225,219.19 296,500.54 225,095.40 296,337.58 225,286.06 296,588.58 225,609.46 297,014.33 225,765.08 297,219.20 225,420.90 503,398.15
47 Trailer 20 Ton Unit/Jam 364,493.45 504,090.91 364,125.07 503,581.44 363,595.39 502,848.89 363,395.54 502,572.51 363,703.34 502,998.19 364,225.44 503,720.25 364,476.67 504,067.70 363,921.03 836,887.45
48 Trailler 15 Ton Unit/Jam 315,702.99 479,990.94 315,383.92 479,505.84 314,925.14 478,808.31 314,752.04 478,545.14 315,018.64 478,950.47 315,470.85 479,638.01 315,688.45 479,968.85 315,207.20 768,171.80
49 Truck Mixer (agitator) Unit/Jam 397,020.42 583,419.95 396,619.17 582,830.31 396,042.22 581,982.49 395,824.54 581,662.61 396,159.81 582,155.28 396,728.50 582,990.97 397,002.15 583,393.10 396,396.93 945,860.94
50 Vibrating Rammer Unit/Jam 81,317.44 81,317.44 81,235.25 81,235.25 81,117.08 81,117.08 81,072.50 81,072.50 81,141.16 81,141.16 81,257.64 81,257.64 81,313.69 81,313.69 81,189.73 155,612.29
51 Vibratory Roller 5-8 T Unit/Jam 196,118.52 420,745.20 195,920.31 420,319.97 195,635.31 419,708.54 195,527.78 419,477.85 195,693.40 419,833.15 195,974.32 420,435.83 196,109.49 420,725.83 195,810.53 599,574.15
52 Water Pump 70-100 MM Unit/Jam 61,227.25 61,227.25 61,165.37 61,165.37 61,076.39 61,076.39 61,042.82 61,042.82 61,094.52 61,094.52 61,182.23 61,182.23 61,224.43 61,224.43 61,131.09 117,166.90
53 Water Tanker 3000-4500 L Unit/Jam 221,948.77 221,948.77 221,724.45 221,724.45 221,401.91 221,401.91 221,280.22 221,280.22 221,467.65 221,467.65 221,785.57 221,785.57 221,938.55 221,938.55 221,600.21 424,730.02
54 Welding Set Unit/Jam 124,367.84 124,367.84 124,242.15 124,242.15 124,061.42 124,061.42 123,993.23 123,993.23 124,098.25 124,098.25 124,276.40 124,276.40 124,362.12 124,362.12 124,172.53 237,995.27
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 216,208.71 344,428.65 215,990.20 344,080.55 215,676.00 343,580.02 215,557.46 343,391.18 215,740.04 343,682.03 216,049.74 344,175.39 216,198.76 344,412.79 215,869.17 541,764.20
HARGA SATUAN DASAR BAHAN KABUPATEN NGAWI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 234,974.65 234,974.65 234,737.17 234,737.17 234,395.70 234,395.70 234,266.87 234,266.87 234,465.29 234,465.29 234,801.87 234,801.87 234,963.83 234,963.83 234,605.63 449,656.87
2 Agregat Pecah Mesin 20-30 mm M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 329,366.17 329,366.17 329,033.29 329,033.29 328,554.66 328,554.66 328,374.07 328,374.07 328,652.21 328,652.21 329,123.99 329,123.99 329,351.01 329,351.01 328,848.92 630,288.26
4 Bahan Agr. Base Kelas A M3 315,307.86 315,307.86 314,989.19 314,989.19 314,530.98 314,530.98 314,358.10 314,358.10 314,624.37 314,624.37 315,076.02 315,076.02 315,293.34 315,293.34 314,812.69 603,385.71
5 Bahan Agr. Base Kelas B M3 296,228.72 296,228.72 295,929.33 295,929.33 295,498.85 295,498.85 295,336.43 295,336.43 295,586.59 295,586.59 296,010.91 296,010.91 296,215.08 296,215.08 295,763.51 566,875.11
6 Bahan Agr. Base Kelas C M3 273,132.92 273,132.92 272,856.88 272,856.88 272,459.96 272,459.96 272,310.20 272,310.20 272,540.85 272,540.85 272,932.09 272,932.09 273,120.35 273,120.35 272,703.98 522,678.07
7 Bahan Agr. Base Kelas C2 M3 249,032.96 249,032.96 248,781.27 248,781.27 248,419.37 248,419.37 248,282.83 248,282.83 248,493.13 248,493.13 248,849.85 248,849.85 249,021.49 249,021.49 248,641.87 476,559.41
8 Bahan Agr. Base Kelas S M3 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
9 Bahan Pilihan M3 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
10 Bahan Tanah Timbunan M3 114,474.83 114,474.83 114,359.13 114,359.13 114,192.78 114,192.78 114,130.01 114,130.01 114,226.68 114,226.68 114,390.66 114,390.66 114,469.56 114,469.56 114,295.05 219,063.60
11 Batu Belah/Kerakal M3 324,345.34 324,345.34 324,017.54 324,017.54 323,546.20 323,546.20 323,368.37 323,368.37 323,642.26 323,642.26 324,106.86 324,106.86 324,330.41 324,330.41 323,835.98 620,680.20
12 Batu Kali M3 357,482.79 357,482.79 357,121.50 357,121.50 356,602.00 356,602.00 356,406.00 356,406.00 356,707.88 356,707.88 357,219.94 357,219.94 357,466.34 357,466.34 356,921.39 684,093.35
13 Chipping M3 212,883.01 212,883.01 212,667.86 212,667.86 212,358.50 212,358.50 212,241.78 212,241.78 212,421.55 212,421.55 212,726.48 212,726.48 212,873.21 212,873.21 212,548.69 407,381.43
14 Chipping (kg) Kg 304.26 304.26 303.95 303.95 303.51 303.51 303.35 303.35 303.60 303.60 304.04 304.04 304.25 304.25 303.78 582.25
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 381,582.76 381,582.76 381,197.11 381,197.11 380,642.59 380,642.59 380,433.37 380,433.37 380,755.61 380,755.61 381,302.19 381,302.19 381,565.19 381,565.19 380,983.51 730,212.01
18 Kapur M3 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30 95,245.88 182,553.00
19 Pasir Beton (Kasar) M3 454,886.81 454,886.81 454,427.08 454,427.08 453,766.03 453,766.03 453,516.63 453,516.63 453,900.76 453,900.76 454,552.34 454,552.34 454,865.87 454,865.87 454,172.44 870,489.58
20 Pasir Halus (untuk HRS) M3 287,191.23 287,191.23 286,900.98 286,900.98 286,483.63 286,483.63 286,326.17 286,326.17 286,568.69 286,568.69 286,980.07 286,980.07 287,178.01 287,178.01 286,740.22 549,580.61
21 Pasir Pasang (Sedang) M3 321,332.85 321,332.85 321,008.09 321,008.09 320,541.13 320,541.13 320,364.95 320,364.95 320,636.30 320,636.30 321,096.58 321,096.58 321,318.06 321,318.06 320,828.22 614,915.37
22 Pasir Urug M3 194,808.04 194,808.04 194,611.15 194,611.15 194,328.06 194,328.06 194,221.25 194,221.25 194,385.76 194,385.76 194,664.80 194,664.80 194,799.07 194,799.07 194,502.11 372,792.45
23 Pasir Urug (ada unsur lempung) M3 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
24 Sirtu M3 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 284,398.36
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
26 Anti Pengelupas Liter 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
27 Arbocell Kg 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 259,417.42
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 284,398.36
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 564,438.67 564,438.67 563,868.22 563,868.22 563,047.97 563,047.97 562,738.50 562,738.50 563,215.15 563,215.15 564,023.65 564,023.65 564,412.69 564,412.69 563,552.26 1,080,132.39
41 Beton K-125 (fc' 10 MPa) M3 583,572.19 583,572.19 582,982.39 582,982.39 582,134.34 582,134.34 581,814.38 581,814.38 582,307.18 582,307.18 583,143.09 583,143.09 583,545.32 583,545.32 582,655.72 1,116,747.04
42 Beton K-175 (fc' 15 MPa) M3 631,405.97 631,405.97 630,767.84 630,767.84 629,850.27 629,850.27 629,504.08 629,504.08 630,037.28 630,037.28 630,941.71 630,941.71 631,376.91 631,376.91 630,414.39 1,208,283.69
43 Beton K-250 (fc' 20 MPa) M3 703,156.65 703,156.65 702,446.00 702,446.00 701,424.17 701,424.17 701,038.64 701,038.64 701,632.43 701,632.43 702,639.63 702,639.63 703,124.28 703,124.28 702,052.39 1,345,588.65
44 Beton K-300 (fc' 25 MPa) M3 731,856.92 731,856.92 731,117.26 731,117.26 730,053.73 730,053.73 729,652.46 729,652.46 730,270.48 730,270.48 731,318.80 731,318.80 731,823.23 731,823.23 730,707.59 1,400,510.64
45 Beton K-350 (fc' 30 MPa) M3 760,557.19 760,557.19 759,788.53 759,788.53 758,683.28 758,683.28 758,266.28 758,266.28 758,908.54 758,908.54 759,997.97 759,997.97 760,522.18 760,522.18 759,362.79 1,455,432.62
46 Beton K-400 (fc' 35 MPa) M3 789,257.46 789,257.46 788,459.80 788,459.80 787,312.84 787,312.84 786,880.10 786,880.10 787,546.60 787,546.60 788,677.14 788,677.14 789,221.13 789,221.13 788,017.99 1,510,354.61
47 Beton K-450 (fc' 40 MPa) M3 827,524.49 827,524.49 826,688.15 826,688.15 825,485.59 825,485.59 825,031.87 825,031.87 825,730.68 825,730.68 826,916.03 826,916.03 827,486.40 827,486.40 826,224.92 1,583,583.92
48 Beton K-500 (fc' 45 MPa) M3 861,008.14 861,008.14 860,137.96 860,137.96 858,886.74 858,886.74 858,414.66 858,414.66 859,141.75 859,141.75 860,375.06 860,375.06 860,968.51 860,968.51 859,655.99 1,647,659.57
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
51 Cat Anti Karat Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
52 Cat Marka (Non Thermoplas) Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
53 Cat Marka (Thermoplastic) Kg 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,463,068.62 1,463,068.62 1,461,589.96 1,461,589.96 1,459,463.82 1,459,463.82 1,458,661.64 1,458,661.64 1,459,897.15 1,459,897.15 1,461,992.85 1,461,992.85 1,463,001.28 1,463,001.28 1,460,770.97 2,799,786.56
57 Curing Compound Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 583,419.95 583,419.95 582,830.31 582,830.31 581,982.49 581,982.49 581,662.61 581,662.61 582,155.28 582,155.28 582,990.97 582,990.97 583,393.10 583,393.10 582,503.73 1,116,455.72
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 678,815.64 678,815.64 678,129.59 678,129.59 677,143.13 677,143.13 676,770.95 676,770.95 677,344.18 677,344.18 678,316.52 678,316.52 678,784.39 678,784.39 677,749.61 1,299,008.73
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 860,569.53 860,569.53 859,699.79 859,699.79 858,449.21 858,449.21 857,977.37 857,977.37 858,704.09 858,704.09 859,936.77 859,936.77 860,529.92 860,529.92 859,218.07 1,646,820.23
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
64 Oxygen (Isi 6 M3) Botol 163,678.92 163,678.92 163,513.50 163,513.50 163,275.64 163,275.64 163,185.89 163,185.89 163,324.11 163,324.11 163,558.57 163,558.57 163,671.39 163,671.39 163,421.87 313,222.52
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,320,477.17 1,320,477.17 1,319,142.62 1,319,142.62 1,317,223.70 1,317,223.70 1,316,499.70 1,316,499.70 1,317,614.79 1,317,614.79 1,319,506.25 1,319,506.25 1,320,416.39 1,320,416.39 1,318,403.45 2,526,917.86
67 Seal Coat M2 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
68 Seal Guard Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
69 Semen/PC (50 kg) Zak 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21 69,178.58 132,591.13
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 11,045.82 9,037.49 11,034.65 9,028.35 11,018.60 9,015.22 11,012.55 9,010.26 11,021.87 9,017.90 11,037.69 9,030.84 11,045.31 9,037.07 11,028.47 19,132.54
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 11,045.82 10,031.50 11,034.65 10,016.91 11,018.60 10,011.40 11,012.55 10,019.88 11,021.87 10,034.27 11,037.69 10,041.19 11,045.31 10,025.88 20,218.69
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,436,585.39 12,436,585.39 12,424,016.26 12,424,016.26 12,405,943.34 12,405,943.34 12,399,124.55 12,399,124.55 12,409,626.76 12,409,626.76 12,427,440.95 12,427,440.95 12,436,012.91 12,436,012.91 12,417,054.57 23,799,146.55
87 Box Culvert Type DUB 200×200 M' 13,201,759.24 13,201,759.24 13,188,416.77 13,188,416.77 13,169,231.90 13,169,231.90 13,161,993.58 13,161,993.58 13,173,141.95 13,173,141.95 13,192,052.18 13,192,052.18 13,201,151.53 13,201,151.53 13,181,026.76 25,263,413.79
88 Box Culvert Type uk 300×200 M' 14,254,124.32 14,254,124.32 14,239,718.27 14,239,718.27 14,219,004.10 14,219,004.10 14,211,188.78 14,211,188.78 14,223,225.83 14,223,225.83 14,243,643.46 14,243,643.46 14,253,468.16 14,253,468.16 14,231,739.16 27,277,261.63
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 355,497.95
91 Ducting (Strand Prestress) M' 161,670.59 161,670.59 161,507.20 161,507.20 161,272.25 161,272.25 161,183.61 161,183.61 161,320.14 161,320.14 161,551.72 161,551.72 161,663.15 161,663.15 161,416.70 309,379.30
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,081,634.36 2,081,634.36 2,079,530.54 2,079,530.54 2,076,505.49 2,076,505.49 2,075,364.17 2,075,364.17 2,077,122.02 2,077,122.02 2,080,103.76 2,080,103.76 2,081,538.54 2,081,538.54 2,078,365.29 3,983,498.65
94 Expansion Join Tipe Rubber M' 1,507,251.89 1,507,251.89 1,505,728.58 1,505,728.58 1,503,538.23 1,503,538.23 1,502,711.82 1,502,711.82 1,503,984.64 1,503,984.64 1,506,143.63 1,506,143.63 1,507,182.51 1,507,182.51 1,504,884.85 2,884,337.42
95 Expansion Join Tipe Torma M' 1,728,168.22 1,728,168.22 1,726,421.64 1,726,421.64 1,723,910.25 1,723,910.25 1,722,962.73 1,722,962.73 1,724,422.10 1,724,422.10 1,726,897.53 1,726,897.53 1,728,088.67 1,728,088.67 1,725,454.25 3,307,091.74
96 Expansion Tipe Joint Asphaltic Plug M' 2,050,505.24 2,050,505.24 2,048,432.88 2,048,432.88 2,045,453.07 2,045,453.07 2,044,328.81 2,044,328.81 2,046,060.38 2,046,060.38 2,048,997.53 2,048,997.53 2,050,410.85 2,050,410.85 2,047,285.06 3,923,928.73
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
99 Glass Bead Kg 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
100 Joint Sealent Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
101 Joint Socket Pile 16×16×16 Set 87,362.37 87,362.37 87,274.07 87,274.07 87,147.12 87,147.12 87,099.22 87,099.22 87,172.99 87,172.99 87,298.13 87,298.13 87,358.35 87,358.35 87,225.17 167,180.12
102 Joint Socket Pile 35×35 Set 748,103.04 748,103.04 747,346.96 747,346.96 746,259.81 746,259.81 745,849.64 745,849.64 746,481.38 746,481.38 747,552.97 747,552.97 748,068.60 748,068.60 746,928.19 1,431,599.85
103 Kawat Beton Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
104 Kawat Bronjong Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
105 Kawat Las Dos 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
106 Kayu Acuan (Kelas III/Meranti) M3 4,114,064.62 4,114,064.62 4,109,906.71 4,109,906.71 4,103,928.13 4,103,928.13 4,101,672.45 4,101,672.45 4,105,146.62 4,105,146.62 4,111,039.61 4,111,039.61 4,113,875.24 4,113,875.24 4,107,603.76 7,872,838.39
107 Kayu Perancah (Gelam) M3 2,649,991.83 2,649,991.83 2,647,313.60 2,647,313.60 2,643,462.61 2,643,462.61 2,642,009.66 2,642,009.66 2,644,247.48 2,644,247.48 2,648,043.33 2,648,043.33 2,649,869.85 2,649,869.85 2,645,830.20 5,071,130.22
108 Kerb Pracetak Type 1 (Peninggi) Buah 52,216.59 52,216.59 52,163.81 52,163.81 52,087.93 52,087.93 52,059.30 52,059.30 52,103.40 52,103.40 52,178.19 52,178.19 52,214.18 52,214.18 52,134.59 99,923.75
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
110 Marmer Nama Jembatan Buah 574,382.47 574,382.47 573,801.96 573,801.96 572,967.27 572,967.27 572,652.34 572,652.34 573,137.38 573,137.38 573,960.13 573,960.13 574,356.03 574,356.03 573,480.44 1,099,161.23
111 Mata Kucing Buah 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
112 Matras Concrete (Tebal=10 cm) M2 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
113 Mini Pile 16×16×16 M' 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 247,887.76
114 Mini Timber Pile Buah 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
115 Multipleks 12 mm Lbr 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 63,597,795.66 63,597,795.66 63,533,520.04 63,533,520.04 63,441,099.36 63,441,099.36 63,406,229.65 63,406,229.65 63,459,935.51 63,459,935.51 63,551,033.12 63,551,033.12 63,594,868.10 63,594,868.10 63,497,919.57 121,703,282.03
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 90,097,713.99 90,097,713.99 90,006,656.02 90,006,656.02 89,875,725.50 89,875,725.50 89,826,326.29 89,826,326.29 89,902,410.30 89,902,410.30 90,031,466.45 90,031,466.45 90,093,566.58 90,093,566.58 89,956,221.54 172,414,584.21
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 172,201,269.22 172,201,269.22 172,027,232.63 172,027,232.63 171,776,988.76 171,776,988.76 171,682,573.41 171,682,573.41 171,827,990.68 171,827,990.68 172,074,652.12 172,074,652.12 172,193,342.38 172,193,342.38 171,930,838.62 329,531,226.90
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 225,815,654.95 225,815,654.95 225,587,432.55 225,587,432.55 225,259,275.95 225,259,275.95 225,135,464.65 225,135,464.65 225,326,157.18 225,326,157.18 225,649,615.97 225,649,615.97 225,805,260.11 225,805,260.11 225,461,026.53 432,129,856.93
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 287,854,986.29 287,854,986.29 287,564,063.36 287,564,063.36 287,145,750.84 287,145,750.84 286,987,924.32 286,987,924.32 287,231,006.64 287,231,006.64 287,643,330.69 287,643,330.69 287,841,735.64 287,841,735.64 287,402,929.25 550,850,799.39
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 347,296,542.40 347,296,542.40 346,945,544.37 346,945,544.37 346,440,851.05 346,440,851.05 346,250,433.62 346,250,433.62 346,543,712.03 346,543,712.03 347,041,180.28 347,041,180.28 347,280,555.51 347,280,555.51 346,751,136.36 664,600,535.39
124 Pelat Rambu (Eng. Grade) Buah 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
125 Pelat Rambu (High L Grade) Buah 233,970.48 233,970.48 233,734.02 233,734.02 233,394.01 233,394.01 233,265.73 233,265.73 233,463.31 233,463.31 233,798.45 233,798.45 233,959.71 233,959.71 233,603.05 447,735.26
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 263,091.27 263,091.27 262,825.37 262,825.37 262,443.05 262,443.05 262,298.80 262,298.80 262,520.97 262,520.97 262,897.82 262,897.82 263,079.16 263,079.16 262,678.10 503,461.96
129 Pipa Galvanis Dia 1,5" M' 104,433.18 104,433.18 104,327.63 104,327.63 104,175.87 104,175.87 104,118.61 104,118.61 104,206.80 104,206.80 104,356.39 104,356.39 104,428.37 104,428.37 104,269.17 199,847.50
130 Pipa Galvanis Dia 2" M' 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
131 Pipa Galvanis Dia 3" M' 230,957.98 230,957.98 230,724.57 230,724.57 230,388.94 230,388.94 230,262.30 230,262.30 230,457.34 230,457.34 230,788.16 230,788.16 230,947.35 230,947.35 230,595.28 441,970.42
132 Pipa Porus M' 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
133 Pipa PVC Dia 4" M' 220,916.33 220,916.33 220,693.06 220,693.06 220,372.03 220,372.03 220,250.90 220,250.90 220,437.46 220,437.46 220,753.90 220,753.90 220,906.16 220,906.16 220,569.40 422,754.32
134 Plastik Filter M2 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
135 Rel Pengaman M' 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,965,151.20 1,965,151.20 1,963,165.10 1,963,165.10 1,960,309.34 1,960,309.34 1,959,231.87 1,959,231.87 1,960,891.37 1,960,891.37 1,963,706.25 1,963,706.25 1,965,060.74 1,965,060.74 1,962,065.06 3,760,591.83
137 Strip Bearing Buah 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
138 Tiang Pancang Baja Diameter 400 M' 695,886.45 695,886.45 695,183.15 695,183.15 694,171.88 694,171.88 693,790.34 693,790.34 694,377.99 694,377.99 695,374.77 695,374.77 695,854.42 695,854.42 694,793.61 1,331,676.11
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 850,527.88 850,527.88 849,668.29 849,668.29 848,432.30 848,432.30 847,965.97 847,965.97 848,684.20 848,684.20 849,902.50 849,902.50 850,488.73 850,488.73 849,192.19 1,627,604.13
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,779,380.65 1,779,380.65 1,777,582.30 1,777,582.30 1,774,996.50 1,774,996.50 1,774,020.89 1,774,020.89 1,775,523.51 1,775,523.51 1,778,072.29 1,778,072.29 1,779,298.74 1,779,298.74 1,776,586.25 3,405,093.88
HARGA SATUAN DASAR UPAH KOTA MADIUN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
2 Tukang OH 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
3 Mandor OH 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
4 Operator OH 310,000 310,000 310,838.75 310,838.75 311,267.27 311,267.27 311,275.94 311,275.94 310,864.82 310,864.82 310,420.78 310,420.78 310,353.58 310,353.58 310,717.91 310,717.91 311,169.80 311,169.80
5 Pembantu Operator OH 194,000 194,000 194,524.90 194,524.90 194,793.07 194,793.07 194,798.49 194,798.49 194,541.21 194,541.21 194,263.32 194,263.32 194,221.27 194,221.27 194,449.27 194,449.27 194,732.07 194,732.07
6 Sopir OH 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
7 Pembantu Sopir OH 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
8 Mekanik OH 175,000 175,000 175,473.49 175,473.49 175,715.40 175,715.40 175,720.29 175,720.29 175,488.20 175,488.20 175,237.53 175,237.53 175,199.60 175,199.60 175,405.27 175,405.27 175,660.37 175,660.37
9 Pembantu Mekanik OH 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
10 Kepala Tukang OH 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
11 Pemasak Aspal OH 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16

HARGA SATUAN DASAR ALAT KOTA MADIUN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 456,681 510,000 457,916.14 511,379.88 458,547.42 512,084.87 458,560.18 512,099.12 457,954.54 511,422.77 457,300.39 510,692.24 457,201.40 510,581.69 457,738.12 511,181.08 458,403.83 511,924.51
2 Asphalt Distribution Unit/Jam 281,183 362,000 281,944.12 362,979.45 282,332.80 363,479.85 282,340.66 363,489.96 281,967.76 363,009.89 281,565.00 362,491.36 281,504.04 362,412.89 281,834.51 362,838.33 282,244.39 363,366.02
3 Asphalt Finisher Unit/Jam 206,524 979,000 207,083.09 981,648.83 207,368.58 983,002.12 207,374.35 983,029.49 207,100.46 981,731.15 206,804.64 980,328.84 206,759.87 980,116.62 207,002.59 981,267.21 207,303.64 982,694.30
4 Asphalt Liquid Mixer Unit/Jam 73,689 135,000 73,888.80 135,365.26 73,990.67 135,551.88 73,992.73 135,555.65 73,895.00 135,376.61 73,789.45 135,183.24 73,773.47 135,153.98 73,860.08 135,312.64 73,967.50 135,509.43
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 98,899 98,899 99,166.55 99,166.55 99,303.26 99,303.26 99,306.03 99,306.03 99,174.87 99,174.87 99,033.21 99,033.21 99,011.77 99,011.77 99,128.00 99,128.00 99,272.17 99,272.17
6 Asphalt Mixing Plant Unit/Jam 1,105,341 5,849,916 1,108,332.06 5,865,743.84 1,109,859.99 5,873,830.29 1,109,890.89 5,873,993.80 1,108,425.00 5,866,235.74 1,106,841.71 5,857,856.33 1,106,602.11 5,856,588.25 1,107,901.18 5,863,463.47 1,109,512.44 5,871,990.93
7 Asphalt Sprayer Unit/Jam 91,142 91,142 91,388.78 91,388.78 91,514.77 91,514.77 91,517.32 91,517.32 91,396.45 91,396.45 91,265.90 91,265.90 91,246.14 91,246.14 91,353.26 91,353.26 91,486.11 91,486.11
8 Asphalt Tanker Unit/Jam 426,623 494,000 427,777.28 495,336.59 428,367.01 496,019.46 428,378.94 496,033.27 427,813.16 495,378.13 427,202.06 494,670.53 427,109.59 494,563.44 427,610.98 495,144.02 428,232.87 495,864.13
9 Blending Equipment Unit/Jam 138,652 219,000 139,027.62 219,592.54 139,219.28 219,895.27 139,223.16 219,901.39 139,039.28 219,610.95 138,840.67 219,297.26 138,810.62 219,249.79 138,973.57 219,507.17 139,175.68 219,826.41
10 Bore Pile Machine Unit/Jam 382,021 664,000 383,055.11 665,796.55 383,583.19 666,714.41 383,593.87 666,732.97 383,087.24 665,852.39 382,540.03 664,901.27 382,457.22 664,757.34 382,906.20 665,537.72 383,463.07 666,505.64
11 Bore Pile Machine Dia 60 Unit/Jam 250,156 756,000 250,833.04 758,045.47 251,178.84 759,090.51 251,185.83 759,111.64 250,854.08 758,109.04 250,495.76 757,026.15 250,441.53 756,862.27 250,735.53 757,750.77 251,100.18 758,852.80
12 Bore Pile Machine Dia 80 Unit/Jam 988,990 988,990 991,665.52 991,665.52 993,032.62 993,032.62 993,060.27 993,060.27 991,748.68 991,748.68 990,332.06 990,332.06 990,117.68 990,117.68 991,280.00 991,280.00 992,721.66 992,721.66
13 Bulldozer 100-150 HP Unit/Jam 387,839 562,000 388,888.44 563,520.58 389,424.56 564,297.44 389,435.40 564,313.15 388,921.05 563,567.83 388,365.51 562,762.83 388,281.44 562,641.00 388,737.26 563,301.50 389,302.61 564,120.73
14 Cement Tanker Unit/Jam 360,690 465,000 361,666.25 466,258.13 362,164.84 466,900.91 362,174.92 466,913.90 361,696.58 466,297.23 361,179.93 465,631.16 361,101.74 465,530.37 361,525.65 466,076.87 362,051.43 466,754.70
15 Cold Milling Unit/Jam 563,336 1,392,196 564,860.46 1,395,962.80 565,639.17 1,397,887.26 565,654.92 1,397,926.17 564,907.83 1,396,079.86 564,100.91 1,394,085.68 563,978.79 1,393,783.90 564,640.86 1,395,420.10 565,462.04 1,397,449.52
16 Cold Recycler Unit/Jam 4,744,242 4,744,242 4,757,077.85 4,757,077.85 4,763,635.91 4,763,635.91 4,763,768.51 4,763,768.51 4,757,476.77 4,757,476.77 4,750,681.13 4,750,681.13 4,749,652.73 4,749,652.73 4,755,228.48 4,755,228.48 4,762,144.20 4,762,144.20
17 Compressor 4000-6500 L\M Unit/Jam 144,470 153,669 144,860.94 154,084.78 145,060.65 154,297.19 145,064.69 154,301.49 144,873.09 154,097.70 144,666.15 153,877.58 144,634.84 153,844.27 144,804.63 154,024.87 145,015.22 154,248.88
18 Concrete Breaker Unit/Jam 526,492 1,004,000 527,916.06 1,006,716.48 528,643.84 1,008,104.32 528,658.55 1,008,132.39 527,960.33 1,006,800.90 527,206.18 1,005,362.77 527,092.06 1,005,145.13 527,710.82 1,006,325.10 528,478.30 1,007,788.64
19 Concrete Mixer (350) Unit/Jam 97,929 97,929 98,194.33 98,194.33 98,329.70 98,329.70 98,332.44 98,332.44 98,202.57 98,202.57 98,062.29 98,062.29 98,041.06 98,041.06 98,156.16 98,156.16 98,298.91 98,298.91
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 111,504 111,504 111,805.43 111,805.43 111,959.56 111,959.56 111,962.68 111,962.68 111,814.80 111,814.80 111,655.08 111,655.08 111,630.91 111,630.91 111,761.96 111,761.96 111,924.50 111,924.50
21 Concrete Pan Mixer Unit/Jam 296,697 635,000 297,499.66 636,718.09 297,909.79 637,595.86 297,918.08 637,613.61 297,524.61 636,771.48 297,099.62 635,861.91 297,035.30 635,724.26 297,384.00 636,470.56 297,816.50 637,396.20
22 Concrete Pump Unit/Jam 225,916 244,294 226,527.52 244,954.97 226,839.81 245,292.67 226,846.12 245,299.50 226,546.51 244,975.52 226,222.91 244,625.59 226,173.94 244,572.64 226,439.45 244,859.75 226,768.77 245,215.85
23 Concrete Vibrator Unit/Jam 84,355 84,355 84,583.24 84,583.24 84,699.84 84,699.84 84,702.20 84,702.20 84,590.33 84,590.33 84,469.50 84,469.50 84,451.21 84,451.21 84,550.35 84,550.35 84,673.32 84,673.32
24 Crane 10-15 Ton Unit/Jam 302,514 380,881 303,332.98 381,911.53 303,751.16 382,438.03 303,759.61 382,448.68 303,358.42 381,943.56 302,925.10 381,397.99 302,859.52 381,315.42 303,215.06 381,763.06 303,656.04 382,318.27
25 Crane On Track 35 Ton Unit/Jam 251,126 477,000 251,805.27 478,290.60 252,152.40 478,949.96 252,159.42 478,963.30 251,826.38 478,330.71 251,466.67 477,647.45 251,412.23 477,544.05 251,707.37 478,104.66 252,073.44 478,799.98
26 Crane On Track 75-100 Ton Unit/Jam 394,626 598,000 395,693.99 599,617.98 396,239.49 600,444.61 396,250.52 600,461.32 395,727.17 599,668.26 395,161.91 598,811.69 395,076.37 598,682.06 395,540.16 599,384.87 396,115.41 600,256.58
27 Dump Truck 10 Ton Unit/Jam 373,295 373,295 374,305.12 374,305.12 374,821.14 374,821.14 374,831.57 374,831.57 374,336.51 374,336.51 373,801.81 373,801.81 373,720.89 373,720.89 374,159.61 374,159.61 374,703.76 374,703.76
28 Dump Truck 3-4 M3 Unit/Jam 203,616 267,000 204,166.43 267,722.41 204,447.89 268,091.49 204,453.58 268,098.95 204,183.55 267,744.86 203,891.89 267,362.41 203,847.76 267,304.53 204,087.06 267,618.33 204,383.87 268,007.54
29 Excavator 80-140 HP Unit/Jam 294,758 468,000 295,555.22 469,266.25 295,962.66 469,913.17 295,970.90 469,926.25 295,580.00 469,305.60 295,157.79 468,635.24 295,093.90 468,533.79 295,440.31 469,083.81 295,869.99 469,766.02
30 Flat Bed Truck 3-4 M3 Unit/Jam 357,782 478,000 358,749.59 479,293.30 359,244.15 479,954.05 359,254.16 479,967.41 358,779.67 479,333.50 358,267.19 478,648.81 358,189.63 478,545.19 358,610.12 479,106.97 359,131.66 479,803.76
31 Fulvi Mixer Unit/Jam 895,908 1,399,000 898,332.30 1,402,785.21 899,570.73 1,404,719.07 899,595.77 1,404,758.18 898,407.63 1,402,902.84 897,124.33 1,400,898.92 896,930.13 1,400,595.66 897,983.06 1,402,239.86 899,289.03 1,404,279.19
32 Generator Set Unit/Jam 398,505 545,761 399,582.87 547,237.64 400,133.73 547,992.06 400,144.87 548,007.31 399,616.38 547,283.53 399,045.56 546,501.78 398,959.18 546,383.48 399,427.53 547,024.89 400,008.43 547,820.45
33 Hot Recycler Unit/Jam 2,927,215 8,584,000 2,935,135.51 8,607,225.33 2,939,181.85 8,619,091.15 2,939,263.67 8,619,331.08 2,935,381.64 8,607,947.12 2,931,188.71 8,595,651.41 2,930,554.18 8,593,790.67 2,933,994.44 8,603,879.17 2,938,261.46 8,616,392.13
34 Jack Hammer Unit/Jam 55,267 55,267 55,416.60 55,416.60 55,493.00 55,493.00 55,494.54 55,494.54 55,421.25 55,421.25 55,342.09 55,342.09 55,330.11 55,330.11 55,395.06 55,395.06 55,475.62 55,475.62
35 Launching Gantry Unit/Jam 70,333,648 70,333,648 70,523,946.54 70,523,946.54 70,621,170.04 70,621,170.04 70,623,135.95 70,623,135.95 70,529,860.57 70,529,860.57 70,429,114.79 70,429,114.79 70,413,868.69 70,413,868.69 70,496,529.51 70,496,529.51 70,599,055.41 70,599,055.41
36 Motor Grader > 100 HP Unit/Jam 276,335 523,647 277,083.01 525,063.81 277,465.00 525,787.65 277,472.72 525,802.29 277,106.25 525,107.84 276,710.43 524,357.77 276,650.53 524,244.26 276,975.29 524,859.68 277,378.11 525,623.01
37 Pedestrian Roller Unit/Jam 91,142 91,142 91,388.78 91,388.78 91,514.77 91,514.77 91,517.32 91,517.32 91,396.45 91,396.45 91,265.90 91,265.90 91,246.14 91,246.14 91,353.26 91,353.26 91,486.11 91,486.11
38 Pile Driver + Hammer Unit/Jam 103,747 303,000 104,027.66 303,819.81 104,171.07 304,238.66 104,173.97 304,247.12 104,036.38 303,845.29 103,887.77 303,411.27 103,865.29 303,345.59 103,987.22 303,701.70 104,138.45 304,143.38
39 Rock Drill Breaker Unit/Jam 100,838 328,000 101,110.99 328,887.45 101,250.39 329,340.85 101,253.20 329,350.02 101,119.47 328,915.03 100,975.03 328,445.21 100,953.17 328,374.11 101,071.69 328,759.60 101,218.68 329,237.72
40 Split Form Paver Unit/Jam 213,311 213,311 213,888.64 213,888.64 214,183.51 214,183.51 214,189.47 214,189.47 213,906.58 213,906.58 213,601.03 213,601.03 213,554.79 213,554.79 213,805.49 213,805.49 214,116.44 214,116.44
41 Stone Crusher Unit/Jam 571,093 716,855 572,638.23 718,794.56 573,427.66 719,785.48 573,443.62 719,805.52 572,686.25 718,854.84 571,868.22 717,828.02 571,744.42 717,672.63 572,415.61 718,515.12 573,248.10 719,560.09
42 Tamper Unit/Jam 85,325 85,325 85,555.46 85,555.46 85,673.40 85,673.40 85,675.79 85,675.79 85,562.63 85,562.63 85,440.41 85,440.41 85,421.92 85,421.92 85,522.20 85,522.20 85,646.57 85,646.57
43 Tandem Roller 6-8 T Unit/Jam 412,079 412,079 413,193.97 413,193.97 413,763.59 413,763.59 413,775.11 413,775.11 413,228.62 413,228.62 412,638.36 412,638.36 412,549.03 412,549.03 413,033.33 413,033.33 413,634.03 413,634.03
44 Three Wheel Roller 6-8 T Unit/Jam 136,713 186,073 137,083.18 186,576.45 137,272.16 186,833.66 137,275.98 186,838.86 137,094.67 186,592.10 136,898.84 186,325.56 136,869.21 186,285.23 137,029.88 186,503.92 137,229.17 186,775.16
45 Tire Roller 8-10 T Unit/Jam 244,339 441,000 244,999.72 442,193.19 245,337.47 442,802.80 245,344.30 442,815.12 245,020.26 442,230.27 244,670.27 441,598.59 244,617.31 441,502.99 244,904.47 442,021.29 245,260.65 442,664.13
46 Track Loader 75-100 HP Unit/Jam 228,825 416,967 229,444.18 418,095.17 229,760.49 418,671.55 229,766.89 418,683.20 229,463.42 418,130.23 229,135.65 417,532.97 229,086.05 417,442.58 229,354.98 417,932.63 229,688.54 418,540.44
47 Trailer 20 Ton Unit/Jam 369,417 511,000 370,416.24 512,382.59 370,926.89 513,088.95 370,937.22 513,103.24 370,447.30 512,425.56 369,918.15 511,693.60 369,838.07 511,582.83 370,272.24 512,183.39 370,810.74 512,928.28
48 Trailler 15 Ton Unit/Jam 319,967 487,000 320,832.96 488,317.65 321,275.26 488,990.84 321,284.20 489,004.45 320,859.87 488,358.60 320,401.55 487,661.02 320,332.19 487,555.46 320,708.24 488,127.81 321,174.65 488,837.72
49 Truck Mixer (agitator) Unit/Jam 402,383 591,000 403,471.76 592,599.04 404,027.98 593,415.99 404,039.23 593,432.51 403,505.59 592,648.74 402,929.22 591,802.19 402,842.00 591,674.08 403,314.90 592,368.66 403,901.46 593,230.17
50 Vibrating Rammer Unit/Jam 82,416 82,416 82,638.79 82,638.79 82,752.72 82,752.72 82,755.02 82,755.02 82,645.72 82,645.72 82,527.67 82,527.67 82,509.81 82,509.81 82,606.67 82,606.67 82,726.81 82,726.81
51 Vibratory Roller 5-8 T Unit/Jam 198,768 427,000 199,305.33 428,155.31 199,580.09 428,745.56 199,585.64 428,757.50 199,322.04 428,191.22 199,037.33 427,579.58 198,994.24 427,487.02 199,227.84 427,988.86 199,517.59 428,611.30
52 Water Pump 70-100 MM Unit/Jam 62,054 62,054 62,222.15 62,222.15 62,307.93 62,307.93 62,309.66 62,309.66 62,227.37 62,227.37 62,138.48 62,138.48 62,125.03 62,125.03 62,197.96 62,197.96 62,288.42 62,288.42
53 Water Tanker 3000-4500 L Unit/Jam 224,947 224,947 225,555.30 225,555.30 225,866.24 225,866.24 225,872.53 225,872.53 225,574.21 225,574.21 225,252.00 225,252.00 225,203.24 225,203.24 225,467.61 225,467.61 225,795.51 225,795.51
54 Welding Set Unit/Jam 126,048 126,048 126,388.74 126,388.74 126,562.98 126,562.98 126,566.50 126,566.50 126,399.34 126,399.34 126,218.79 126,218.79 126,191.47 126,191.47 126,339.61 126,339.61 126,523.35 126,523.35
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 219,129 428,823 219,721.97 429,983.25 220,024.88 430,576.02 220,031.00 430,588.00 219,740.39 430,019.30 219,426.51 429,405.06 219,379.01 429,312.10 219,636.55 429,816.09 219,955.98 430,441.18
HARGA SATUAN DASAR BAHAN KOTA MADIUN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 305,000 305,000 305,825.22 305,825.22 306,246.83 306,246.83 306,255.36 306,255.36 305,850.87 305,850.87 305,413.99 305,413.99 305,347.87 305,347.87 305,706.33 305,706.33 306,150.93 306,150.93
2 Agregat Pecah Mesin 20-30 mm M3 291,000 291,000 291,787.35 291,787.35 292,189.60 292,189.60 292,197.73 292,197.73 291,811.81 291,811.81 291,394.99 291,394.99 291,331.91 291,331.91 291,673.91 291,673.91 292,098.10 292,098.10
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 334,000 334,000 334,903.69 334,903.69 335,365.38 335,365.38 335,374.72 335,374.72 334,931.77 334,931.77 334,453.35 334,453.35 334,380.95 334,380.95 334,773.49 334,773.49 335,260.36 335,260.36
4 Bahan Agr. Base Kelas A M3 320,000 320,000 320,865.81 320,865.81 321,308.15 321,308.15 321,317.10 321,317.10 320,892.72 320,892.72 320,434.35 320,434.35 320,364.98 320,364.98 320,741.07 320,741.07 321,207.54 321,207.54
5 Bahan Agr. Base Kelas B M3 301,000 301,000 301,814.40 301,814.40 302,230.48 302,230.48 302,238.89 302,238.89 301,839.71 301,839.71 301,408.56 301,408.56 301,343.31 301,343.31 301,697.07 301,697.07 302,135.84 302,135.84
6 Bahan Agr. Base Kelas C M3 276,000 276,000 276,746.76 276,746.76 277,128.28 277,128.28 277,135.99 277,135.99 276,769.97 276,769.97 276,374.63 276,374.63 276,314.80 276,314.80 276,639.17 276,639.17 277,041.50 277,041.50
7 Bahan Agr. Base Kelas C2 M3 252,000 252,000 252,681.82 252,681.82 253,030.17 253,030.17 253,037.21 253,037.21 252,703.01 252,703.01 252,342.05 252,342.05 252,287.42 252,287.42 252,583.59 252,583.59 252,950.93 252,950.93
8 Bahan Agr. Base Kelas S M3 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68 204,472.43 204,472.43 204,769.80 204,769.80
9 Bahan Pilihan M3 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68 204,472.43 204,472.43 204,769.80 204,769.80
10 Bahan Tanah Timbunan M3 116,000 116,000 116,313.86 116,313.86 116,474.20 116,474.20 116,477.45 116,477.45 116,323.61 116,323.61 116,157.45 116,157.45 116,132.31 116,132.31 116,268.64 116,268.64 116,437.73 116,437.73
11 Batu Belah/Kerakal M3 329,000 329,000 329,890.16 329,890.16 330,344.94 330,344.94 330,354.14 330,354.14 329,917.82 329,917.82 329,446.57 329,446.57 329,375.25 329,375.25 329,761.91 329,761.91 330,241.50 330,241.50
12 Batu Kali M3 362,000 362,000 362,979.45 362,979.45 363,479.85 363,479.85 363,489.96 363,489.96 363,009.89 363,009.89 362,491.36 362,491.36 362,412.89 362,412.89 362,838.33 362,838.33 363,366.02 363,366.02
13 Chipping M3 216,000 216,000 216,584.42 216,584.42 216,883.00 216,883.00 216,889.04 216,889.04 216,602.58 216,602.58 216,293.19 216,293.19 216,246.36 216,246.36 216,500.22 216,500.22 216,815.09 216,815.09
14 Chipping (kg) Kg 308 308 308.83 308.83 309.26 309.26 309.27 309.27 308.86 308.86 308.42 308.42 308.35 308.35 308.71 308.71 309.16 309.16
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 387,000 387,000 388,047.09 388,047.09 388,582.05 388,582.05 388,592.86 388,592.86 388,079.63 388,079.63 387,525.29 387,525.29 387,441.40 387,441.40 387,896.23 387,896.23 388,460.36 388,460.36
18 Kapur M3 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
19 Pasir Beton (Kasar) M3 461,000 461,000 462,247.31 462,247.31 462,884.55 462,884.55 462,897.44 462,897.44 462,286.07 462,286.07 461,625.73 461,625.73 461,525.80 461,525.80 462,067.60 462,067.60 462,739.61 462,739.61
20 Pasir Halus (untuk HRS) M3 291,000 291,000 291,787.35 291,787.35 292,189.60 292,189.60 292,197.73 292,197.73 291,811.81 291,811.81 291,394.99 291,394.99 291,331.91 291,331.91 291,673.91 291,673.91 292,098.10 292,098.10
21 Pasir Pasang (Sedang) M3 326,000 326,000 326,882.04 326,882.04 327,332.68 327,332.68 327,341.79 327,341.79 326,909.45 326,909.45 326,442.49 326,442.49 326,371.83 326,371.83 326,754.96 326,754.96 327,230.18 327,230.18
22 Pasir Urug M3 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
23 Pasir Urug (ada unsur lempung) M3 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79 155,358.96 155,358.96 155,584.90 155,584.90
24 Sirtu M3 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
26 Anti Pengelupas Liter 98,000 98,000 98,265.15 98,265.15 98,400.62 98,400.62 98,403.36 98,403.36 98,273.39 98,273.39 98,133.02 98,133.02 98,111.78 98,111.78 98,226.95 98,226.95 98,369.81 98,369.81
27 Arbocell Kg 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,350 9,350 9,375.30 9,375.30 9,388.22 9,388.22 9,388.48 9,388.48 9,376.08 9,376.08 9,362.69 9,362.69 9,360.66 9,360.66 9,371.65 9,371.65 9,385.28 9,385.28
30 Aspal Emulsi (CSS-1) Kg 9,350 9,350 9,375.30 9,375.30 9,388.22 9,388.22 9,388.48 9,388.48 9,376.08 9,376.08 9,362.69 9,362.69 9,360.66 9,360.66 9,371.65 9,371.65 9,385.28 9,385.28
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 572,063 572,063 573,610.45 573,610.45 574,401.22 574,401.22 574,417.21 574,417.21 573,658.55 573,658.55 572,839.13 572,839.13 572,715.13 572,715.13 573,387.45 573,387.45 574,221.35 574,221.35
41 Beton K-125 (fc' 10 MPa) M3 591,455 591,455 593,054.87 593,054.87 593,872.45 593,872.45 593,888.98 593,888.98 593,104.61 593,104.61 592,257.41 592,257.41 592,129.20 592,129.20 592,824.32 592,824.32 593,686.48 593,686.48
42 Beton K-175 (fc' 15 MPa) M3 639,934 639,934 641,665.93 641,665.93 642,550.52 642,550.52 642,568.41 642,568.41 641,719.74 641,719.74 640,803.10 640,803.10 640,664.38 640,664.38 641,416.47 641,416.47 642,349.31 642,349.31
43 Beton K-250 (fc' 20 MPa) M3 712,654 712,654 714,582.51 714,582.51 715,567.63 715,567.63 715,587.54 715,587.54 714,642.43 714,642.43 713,621.63 713,621.63 713,467.15 713,467.15 714,304.71 714,304.71 715,343.55 715,343.55
44 Beton K-300 (fc' 25 MPa) M3 741,742 741,742 743,749.14 743,749.14 744,774.47 744,774.47 744,795.20 744,795.20 743,811.51 743,811.51 742,749.04 742,749.04 742,588.26 742,588.26 743,460.00 743,460.00 744,541.25 744,541.25
45 Beton K-350 (fc' 30 MPa) M3 770,830 770,830 772,915.78 772,915.78 773,981.31 773,981.31 774,002.85 774,002.85 772,980.59 772,980.59 771,876.46 771,876.46 771,709.36 771,709.36 772,615.30 772,615.30 773,738.94 773,738.94
46 Beton K-400 (fc' 35 MPa) M3 799,918 799,918 802,082.41 802,082.41 803,188.15 803,188.15 803,210.51 803,210.51 802,149.67 802,149.67 801,003.87 801,003.87 800,830.47 800,830.47 801,770.59 801,770.59 802,936.64 802,936.64
47 Beton K-450 (fc' 40 MPa) M3 838,702 838,702 840,971.25 840,971.25 842,130.61 842,130.61 842,154.05 842,154.05 841,041.78 841,041.78 839,840.42 839,840.42 839,658.62 839,658.62 840,644.32 840,644.32 841,866.90 841,866.90
48 Beton K-500 (fc' 45 MPa) M3 872,638 872,638 874,998.99 874,998.99 876,205.26 876,205.26 876,229.65 876,229.65 875,072.37 875,072.37 873,822.40 873,822.40 873,633.24 873,633.24 874,658.83 874,658.83 875,930.88 875,930.88
49 Bunker Oil Liter 5,000 5,000 5,013.53 5,013.53 5,020.44 5,020.44 5,020.58 5,020.58 5,013.95 5,013.95 5,006.79 5,006.79 5,005.70 5,005.70 5,011.58 5,011.58 5,018.87 5,018.87
50 Cat Kg 72,500 72,500 72,696.16 72,696.16 72,796.38 72,796.38 72,798.40 72,798.40 72,702.26 72,702.26 72,598.41 72,598.41 72,582.69 72,582.69 72,667.90 72,667.90 72,773.58 72,773.58
51 Cat Anti Karat Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
52 Cat Marka (Non Thermoplas) Kg 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
53 Cat Marka (Thermoplastic) Kg 54,500 54,500 54,647.46 54,647.46 54,722.79 54,722.79 54,724.32 54,724.32 54,652.04 54,652.04 54,573.98 54,573.98 54,562.16 54,562.16 54,626.21 54,626.21 54,705.66 54,705.66
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,439,000 1,439,000 1,442,893.44 1,442,893.44 1,444,882.59 1,444,882.59 1,444,922.81 1,444,922.81 1,443,014.43 1,443,014.43 1,440,953.21 1,440,953.21 1,440,641.28 1,440,641.28 1,442,332.49 1,442,332.49 1,444,430.13 1,444,430.13
57 Curing Compound Liter 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 591,000 591,000 592,599.04 592,599.04 593,415.99 593,415.99 593,432.51 593,432.51 592,648.74 592,648.74 591,802.19 591,802.19 591,674.08 591,674.08 592,368.66 592,368.66 593,230.17 593,230.17
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 688,000 688,000 689,861.49 689,861.49 690,812.52 690,812.52 690,831.76 690,831.76 689,919.34 689,919.34 688,933.85 688,933.85 688,784.71 688,784.71 689,593.30 689,593.30 690,596.20 690,596.20
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 873,000 873,000 875,362.04 875,362.04 876,568.80 876,568.80 876,593.20 876,593.20 875,435.44 875,435.44 874,184.96 874,184.96 873,995.72 873,995.72 875,021.73 875,021.73 876,294.31 876,294.31
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
64 Oxygen (Isi 6 M3) Botol 166,000 166,000 166,449.14 166,449.14 166,678.60 166,678.60 166,683.24 166,683.24 166,463.10 166,463.10 166,225.32 166,225.32 166,189.34 166,189.34 166,384.43 166,384.43 166,626.41 166,626.41
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,338,000 1,338,000 1,341,620.16 1,341,620.16 1,343,469.71 1,343,469.71 1,343,507.11 1,343,507.11 1,341,732.67 1,341,732.67 1,339,816.12 1,339,816.12 1,339,526.09 1,339,526.09 1,341,098.59 1,341,098.59 1,343,049.01 1,343,049.01
67 Seal Coat M2 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
68 Seal Guard Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
69 Semen/PC (50 kg) Zak 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
78 Baja Tulangan (Polos) U32 Kg 10,754 10,754 10,783.10 10,783.10 10,797.96 10,797.96 10,798.26 10,798.26 10,784.00 10,784.00 10,768.60 10,768.60 10,766.27 10,766.27 10,778.90 10,778.90 10,794.58 10,794.58
79 Baja Tulangan (Polos) U36 Kg 10,754 10,754 10,783.10 10,783.10 10,797.96 10,797.96 10,798.26 10,798.26 10,784.00 10,784.00 10,768.60 10,768.60 10,766.27 10,766.27 10,778.90 10,778.90 10,794.58 10,794.58
80 Baja Tulangan (Ulir) D16 Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
81 Baja Tulangan (Ulir) D19 Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
82 Baja Tulangan (Ulir) D24 Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
83 Baja Tulangan (Ulir) D32 Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
84 Baja Tulangan (Ulir) D36 Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,605,000 12,605,000 12,639,104.76 12,639,104.76 12,656,528.88 12,656,528.88 12,656,881.21 12,656,881.21 12,640,164.66 12,640,164.66 12,622,109.28 12,622,109.28 12,619,376.92 12,619,376.92 12,634,191.16 12,634,191.16 12,652,565.56 12,652,565.56
87 Box Culvert Type DUB 200×200 M' 13,380,000 13,380,000 13,416,201.64 13,416,201.64 13,434,697.06 13,434,697.06 13,435,071.05 13,435,071.05 13,417,326.70 13,417,326.70 13,398,161.22 13,398,161.22 13,395,260.86 13,395,260.86 13,410,985.93 13,410,985.93 13,430,490.06 13,430,490.06
88 Box Culvert Type uk 300×200 M' 14,447,000 14,447,000 14,486,088.57 14,486,088.57 14,506,058.93 14,506,058.93 14,506,462.74 14,506,462.74 14,487,303.36 14,487,303.36 14,466,609.50 14,466,609.50 14,463,477.85 14,463,477.85 14,480,456.93 14,480,456.93 14,501,516.44 14,501,516.44
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 188,000 188,000 188,508.66 188,508.66 188,768.54 188,768.54 188,773.79 188,773.79 188,524.47 188,524.47 188,255.18 188,255.18 188,214.43 188,214.43 188,435.38 188,435.38 188,709.43 188,709.43
91 Ducting (Strand Prestress) M' 164,000 164,000 164,443.73 164,443.73 164,670.43 164,670.43 164,675.01 164,675.01 164,457.52 164,457.52 164,222.60 164,222.60 164,187.05 164,187.05 164,379.80 164,379.80 164,618.86 164,618.86
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,110,000 2,110,000 2,115,708.93 2,115,708.93 2,118,625.62 2,118,625.62 2,118,684.60 2,118,684.60 2,115,886.35 2,115,886.35 2,112,863.99 2,112,863.99 2,112,406.61 2,112,406.61 2,114,886.42 2,114,886.42 2,117,962.18 2,117,962.18
94 Expansion Join Tipe Rubber M' 1,528,000 1,528,000 1,532,134.24 1,532,134.24 1,534,246.42 1,534,246.42 1,534,289.13 1,534,289.13 1,532,262.72 1,532,262.72 1,530,074.02 1,530,074.02 1,529,742.79 1,529,742.79 1,531,538.60 1,531,538.60 1,533,765.98 1,533,765.98
95 Expansion Join Tipe Torma M' 1,752,000 1,752,000 1,756,740.30 1,756,740.30 1,759,162.13 1,759,162.13 1,759,211.10 1,759,211.10 1,756,887.62 1,756,887.62 1,754,378.06 1,754,378.06 1,753,998.28 1,753,998.28 1,756,057.35 1,756,057.35 1,758,611.25 1,758,611.25
96 Expansion Tipe Joint Asphaltic Plug M' 2,078,000 2,078,000 2,083,622.35 2,083,622.35 2,086,494.81 2,086,494.81 2,086,552.89 2,086,552.89 2,083,797.08 2,083,797.08 2,080,820.55 2,080,820.55 2,080,370.11 2,080,370.11 2,082,812.31 2,082,812.31 2,085,841.43 2,085,841.43
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
99 Glass Bead Kg 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
100 Joint Sealent Kg 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
101 Joint Socket Pile 16×16×16 Set 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
102 Joint Socket Pile 35×35 Set 758,000 758,000 760,050.89 760,050.89 761,098.68 761,098.68 761,119.87 761,119.87 760,114.62 760,114.62 759,028.86 759,028.86 758,864.55 758,864.55 759,755.41 759,755.41 760,860.35 760,860.35
103 Kawat Beton Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
104 Kawat Bronjong Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
105 Kawat Las Dos 175,000 175,000 175,473.49 175,473.49 175,715.40 175,715.40 175,720.29 175,720.29 175,488.20 175,488.20 175,237.53 175,237.53 175,199.60 175,199.60 175,405.27 175,405.27 175,660.37 175,660.37
106 Kayu Acuan (Kelas III/Meranti) M3 4,169,000 4,169,000 4,180,279.87 4,180,279.87 4,186,042.75 4,186,042.75 4,186,159.28 4,186,159.28 4,180,630.42 4,180,630.42 4,174,658.75 4,174,658.75 4,173,755.05 4,173,755.05 4,178,654.73 4,178,654.73 4,184,731.92 4,184,731.92
107 Kayu Perancah (Gelam) M3 3,265,800 3,265,800 3,274,636.12 3,274,636.12 3,279,150.50 3,279,150.50 3,279,241.78 3,279,241.78 3,274,910.73 3,274,910.73 3,270,232.80 3,270,232.80 3,269,524.88 3,269,524.88 3,273,363.07 3,273,363.07 3,278,123.65 3,278,123.65
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
110 Marmer Nama Jembatan Buah 582,000 582,000 583,574.69 583,574.69 584,379.20 584,379.20 584,395.47 584,395.47 583,623.63 583,623.63 582,789.97 582,789.97 582,663.81 582,663.81 583,347.82 583,347.82 584,196.20 584,196.20
111 Mata Kucing Buah 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
112 Matras Concrete (Tebal=10 cm) M2 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
113 Mini Pile 16×16×16 M' 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
114 Mini Timber Pile Buah 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
115 Multipleks 12 mm Lbr 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79 155,358.96 155,358.96 155,584.90 155,584.90
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,457,000 64,457,000 64,631,398.29 64,631,398.29 64,720,498.40 64,720,498.40 64,722,300.05 64,722,300.05 64,636,818.19 64,636,818.19 64,544,490.11 64,544,490.11 64,530,517.88 64,530,517.88 64,606,272.06 64,606,272.06 64,700,231.53 64,700,231.53
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 91,314,000 91,314,000 91,561,064.02 91,561,064.02 91,687,289.05 91,687,289.05 91,689,841.40 91,689,841.40 91,568,742.20 91,568,742.20 91,437,944.21 91,437,944.21 91,418,150.23 91,418,150.23 91,525,468.56 91,525,468.56 91,658,577.69 91,658,577.69
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 174,528,000 174,528,000 175,000,212.26 175,000,212.26 175,241,465.53 175,241,465.53 175,246,343.82 175,246,343.82 175,014,887.52 175,014,887.52 174,764,893.96 174,764,893.96 174,727,061.83 174,727,061.83 174,932,178.82 174,932,178.82 175,186,589.64 175,186,589.64
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 228,865,000 228,865,000 229,484,229.34 229,484,229.34 229,800,593.65 229,800,593.65 229,806,990.73 229,806,990.73 229,503,473.55 229,503,473.55 229,175,647.78 229,175,647.78 229,126,037.11 229,126,037.11 229,395,014.59 229,395,014.59 229,728,632.88 229,728,632.88
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 291,743,000 291,743,000 292,532,355.41 292,532,355.41 292,935,637.14 292,935,637.14 292,943,791.74 292,943,791.74 292,556,886.75 292,556,886.75 292,138,994.65 292,138,994.65 292,075,754.02 292,075,754.02 292,418,629.94 292,418,629.94 292,843,905.98 292,843,905.98
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 351,987,000 351,987,000 352,939,354.79 352,939,354.79 353,425,912.91 353,425,912.91 353,435,751.41 353,435,751.41 352,968,951.77 352,968,951.77 352,464,766.29 352,464,766.29 352,388,466.67 352,388,466.67 352,802,145.37 352,802,145.37 353,315,239.55 353,315,239.55
124 Pelat Rambu (Eng. Grade) Buah 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68 204,472.43 204,472.43 204,769.80 204,769.80
125 Pelat Rambu (High L Grade) Buah 238,000 238,000 238,643.95 238,643.95 238,972.94 238,972.94 238,979.59 238,979.59 238,663.96 238,663.96 238,323.05 238,323.05 238,271.46 238,271.46 238,551.17 238,551.17 238,898.10 238,898.10
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
128 Pipa Drainase Baja Dia 3" M' 267,000 267,000 267,722.41 267,722.41 268,091.49 268,091.49 268,098.95 268,098.95 267,744.86 267,744.86 267,362.41 267,362.41 267,304.53 267,304.53 267,618.33 267,618.33 268,007.54 268,007.54
129 Pipa Galvanis Dia 1,5" M' 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
130 Pipa Galvanis Dia 2" M' 305,000 305,000 305,825.22 305,825.22 306,246.83 306,246.83 306,255.36 306,255.36 305,850.87 305,850.87 305,413.99 305,413.99 305,347.87 305,347.87 305,706.33 305,706.33 306,150.93 306,150.93
131 Pipa Galvanis Dia 3" M' 234,000 234,000 234,633.12 234,633.12 234,956.59 234,956.59 234,963.13 234,963.13 234,652.80 234,652.80 234,317.62 234,317.62 234,266.89 234,266.89 234,541.91 234,541.91 234,883.01 234,883.01
132 Pipa Porus M' 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
133 Pipa PVC Dia 4" M' 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
134 Plastik Filter M2 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
135 Rel Pengaman M' 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,992,000 1,992,000 1,997,389.66 1,997,389.66 2,000,143.24 2,000,143.24 2,000,198.92 2,000,198.92 1,997,557.16 1,997,557.16 1,994,703.82 1,994,703.82 1,994,272.02 1,994,272.02 1,996,613.15 1,996,613.15 1,999,516.91 1,999,516.91
137 Strip Bearing Buah 305,000 305,000 305,825.22 305,825.22 306,246.83 306,246.83 306,255.36 306,255.36 305,850.87 305,850.87 305,413.99 305,413.99 305,347.87 305,347.87 305,706.33 305,706.33 306,150.93 306,150.93
138 Tiang Pancang Baja Diameter 400 M' 706,000 706,000 707,910.19 707,910.19 708,886.11 708,886.11 708,905.84 708,905.84 707,969.56 707,969.56 706,958.28 706,958.28 706,805.24 706,805.24 707,634.98 707,634.98 708,664.12 708,664.12
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 862,000 862,000 864,332.27 864,332.27 865,523.83 865,523.83 865,547.93 865,547.93 864,404.75 864,404.75 863,170.03 863,170.03 862,983.17 862,983.17 863,996.25 863,996.25 865,252.80 865,252.80
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,803,000 1,803,000 1,807,878.29 1,807,878.29 1,810,370.61 1,810,370.61 1,810,421.01 1,810,421.01 1,808,029.90 1,808,029.90 1,805,447.29 1,805,447.29 1,805,056.45 1,805,056.45 1,807,175.46 1,807,175.46 1,809,803.71 1,809,803.71
HARGA SATUAN DASAR UPAH KOTA MADIUN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 116,300.23
2 Tukang OH 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 131,339.05
3 Mandor OH 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 150,388.23
4 Operator OH 311,291.20 311,291.20 310,976.59 310,976.59 310,524.22 310,524.22 310,353.54 310,353.54 310,616.41 310,616.41 311,062.31 311,062.31 311,276.87 311,276.87 310,802.33 310,802.33
5 Pembantu Operator OH 194,808.04 194,808.04 194,611.15 194,611.15 194,328.06 194,328.06 194,221.25 194,221.25 194,385.76 194,385.76 194,664.80 194,664.80 194,799.07 194,799.07 194,502.11 194,502.11
6 Sopir OH 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 145,375.29
7 Pembantu Sopir OH 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 126,326.11
8 Mekanik OH 175,728.90 175,728.90 175,551.30 175,551.30 175,295.93 175,295.93 175,199.58 175,199.58 175,347.98 175,347.98 175,599.69 175,599.69 175,720.81 175,720.81 175,452.93 175,452.93
9 Pembantu Mekanik OH 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 126,326.11
10 Kepala Tukang OH 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 145,375.29
11 Pemasak Aspal OH 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 145,375.29

HARGA SATUAN DASAR ALAT KOTA MADIUN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 458,582.66 512,124.23 458,119.19 511,606.64 457,452.78 510,862.42 457,201.34 510,581.63 457,588.60 511,014.10 458,245.47 511,747.67 458,561.55 512,100.65 457,862.49 931,019.58
2 Asphalt Distribution Unit/Jam 282,354.51 363,507.78 282,069.14 363,140.40 281,658.82 362,612.15 281,504.01 362,412.85 281,742.45 362,719.81 282,146.89 363,240.50 282,341.51 363,491.05 281,911.09 621,350.69
3 Asphalt Finisher Unit/Jam 207,384.52 983,077.68 207,174.92 982,084.13 206,873.55 980,655.51 206,759.84 980,116.51 206,934.97 980,946.68 207,232.03 982,354.84 207,374.97 983,032.43 207,058.83 1,171,334.29
4 Asphalt Liquid Mixer Unit/Jam 73,996.35 135,562.30 73,921.57 135,425.29 73,814.04 135,228.29 73,773.47 135,153.96 73,835.95 135,268.44 73,941.94 135,462.62 73,992.95 135,556.06 73,880.15 203,071.63
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 99,310.90 99,310.90 99,210.53 99,210.53 99,066.21 99,066.21 99,011.76 99,011.76 99,095.62 99,095.62 99,237.87 99,237.87 99,306.32 99,306.32 99,154.93 190,045.30
6 Asphalt Mixing Plant Unit/Jam 1,109,945.30 5,874,281.78 1,108,823.52 5,868,344.89 1,107,210.55 5,859,808.35 1,106,601.98 5,856,587.57 1,107,539.29 5,861,548.18 1,109,129.17 5,869,962.51 1,109,894.21 5,874,011.38 1,108,202.20 6,880,890.07
7 Asphalt Sprayer Unit/Jam 91,521.81 91,521.81 91,429.31 91,429.31 91,296.31 91,296.31 91,246.13 91,246.13 91,323.41 91,323.41 91,454.51 91,454.51 91,517.59 91,517.59 91,378.08 175,139.78
8 Asphalt Tanker Unit/Jam 428,399.94 496,057.58 427,966.97 495,556.24 427,344.42 494,835.37 427,109.54 494,563.39 427,471.30 494,982.29 428,084.94 495,692.84 428,380.22 496,034.75 427,727.17 887,354.63
9 Blending Equipment Unit/Jam 139,229.98 219,912.17 139,089.27 219,689.91 138,886.94 219,370.33 138,810.60 219,249.76 138,928.17 219,435.47 139,127.61 219,750.47 139,223.57 219,902.04 139,011.33 346,991.53
10 Bore Pile Machine Unit/Jam 383,612.67 666,765.66 383,224.97 666,091.79 382,667.50 665,122.84 382,457.18 664,757.26 382,781.12 665,320.32 383,330.61 666,275.40 383,595.02 666,734.97 383,010.24 1,016,804.85
11 Bore Pile Machine Dia 60 Unit/Jam 251,198.15 759,148.85 250,944.27 758,381.61 250,579.23 757,278.41 250,441.50 756,862.18 250,653.63 757,503.26 251,013.44 758,590.66 251,186.58 759,113.91 250,803.66 987,855.81
12 Bore Pile Machine Dia 80 Unit/Jam 993,108.95 993,108.95 992,105.26 992,105.26 990,662.07 990,662.07 990,117.56 990,117.56 990,956.20 990,956.20 992,378.73 992,378.73 993,063.24 993,063.24 991,549.34 1,900,452.96
13 Bulldozer 100-150 HP Unit/Jam 389,454.49 564,340.81 389,060.89 563,770.46 388,494.93 562,950.36 388,281.40 562,640.94 388,610.28 563,117.50 389,168.13 563,925.86 389,436.56 564,314.84 388,842.88 919,887.35
14 Cement Tanker Unit/Jam 362,192.68 466,936.80 361,826.62 466,464.88 361,300.28 465,786.33 361,101.70 465,530.31 361,407.56 465,924.62 361,926.36 466,593.46 362,176.00 466,915.30 361,623.88 797,686.00
15 Cold Milling Unit/Jam 565,682.65 1,397,994.71 565,110.94 1,396,581.81 564,288.88 1,394,550.24 563,978.73 1,393,783.74 564,456.43 1,394,964.29 565,266.71 1,396,966.78 565,656.61 1,397,930.35 564,794.28 1,913,517.88
16 Cold Recycler Unit/Jam 4,764,002.06 4,764,002.06 4,759,187.29 4,759,187.29 4,752,264.21 4,752,264.21 4,749,652.18 4,749,652.18 4,753,675.19 4,753,675.19 4,760,499.16 4,760,499.16 4,763,782.76 4,763,782.76 4,756,520.51 9,116,584.63
17 Compressor 4000-6500 L\M Unit/Jam 145,071.80 154,309.05 144,925.18 154,153.10 144,714.36 153,928.86 144,634.82 153,844.25 144,757.33 153,974.56 144,965.13 154,195.59 145,065.12 154,301.95 144,843.97 286,837.94
18 Concrete Breaker Unit/Jam 528,684.47 1,008,181.81 528,150.15 1,007,162.88 527,381.87 1,005,697.79 527,092.00 1,005,145.02 527,538.45 1,005,996.39 528,295.74 1,007,440.51 528,660.14 1,008,135.40 527,854.21 1,490,456.04
19 Concrete Mixer (350) Unit/Jam 98,337.26 98,337.26 98,237.87 98,237.87 98,094.97 98,094.97 98,041.05 98,041.05 98,124.09 98,124.09 98,264.95 98,264.95 98,332.73 98,332.73 98,182.83 188,182.11
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 111,968.17 111,968.17 111,855.00 111,855.00 111,692.29 111,692.29 111,630.90 111,630.90 111,725.45 111,725.45 111,885.84 111,885.84 111,963.01 111,963.01 111,792.33 214,266.76
21 Concrete Pan Mixer Unit/Jam 297,932.69 637,644.87 297,631.58 637,000.43 297,198.62 636,073.80 297,035.27 635,724.19 297,286.86 636,262.66 297,713.62 637,176.02 297,918.97 637,615.52 297,464.80 909,314.58
22 Concrete Pump Unit/Jam 226,857.24 245,311.52 226,627.97 245,063.60 226,298.30 244,707.11 226,173.91 244,572.61 226,365.49 244,779.76 226,690.44 245,131.15 226,846.80 245,300.23 226,500.98 452,548.38
23 Concrete Vibrator Unit/Jam 84,706.35 84,706.35 84,620.74 84,620.74 84,497.65 84,497.65 84,451.20 84,451.20 84,522.73 84,522.73 84,644.07 84,644.07 84,702.45 84,702.45 84,573.33 162,097.46
24 Crane 10-15 Ton Unit/Jam 303,774.50 382,467.43 303,467.49 382,080.88 303,026.04 381,525.08 302,859.49 381,315.38 303,116.01 381,638.36 303,551.14 382,186.20 303,760.52 382,449.82 303,297.45 659,884.36
25 Crane On Track 35 Ton Unit/Jam 252,171.78 478,986.78 251,916.92 478,502.69 251,550.47 477,806.62 251,412.20 477,544.00 251,625.15 477,948.48 251,986.36 478,634.58 252,160.17 478,964.73 251,775.76 709,024.79
26 Crane On Track 75-100 Ton Unit/Jam 396,269.94 600,490.76 395,869.45 599,883.87 395,293.59 599,011.23 395,076.32 598,681.99 395,410.96 599,189.08 395,978.57 600,049.23 396,251.70 600,463.12 395,647.63 962,218.09
27 Dump Truck 10 Ton Unit/Jam 374,849.95 374,849.95 374,471.10 374,471.10 373,926.37 373,926.37 373,720.84 373,720.84 374,037.39 374,037.39 374,574.33 374,574.33 374,832.69 374,832.69 374,261.27 717,327.83
28 Dump Truck 3-4 M3 Unit/Jam 204,463.61 268,112.10 204,256.97 267,841.13 203,959.84 267,451.50 203,847.73 267,304.50 204,020.39 267,530.91 204,313.27 267,914.96 204,454.20 268,099.75 204,142.51 454,818.26
29 Excavator 80-140 HP Unit/Jam 295,985.41 469,949.29 295,686.27 469,474.33 295,256.15 468,791.40 295,093.86 468,533.73 295,343.81 468,930.59 295,767.78 469,603.74 295,971.79 469,927.66 295,520.59 740,100.19
30 Flat Bed Truck 3-4 M3 Unit/Jam 359,271.77 479,990.94 358,908.67 479,505.84 358,386.57 478,808.31 358,189.59 478,545.14 358,492.98 478,950.47 359,007.60 479,638.01 359,255.23 479,968.85 358,707.56 808,046.40
31 Fulvi Mixer Unit/Jam 899,639.87 1,404,827.05 898,730.65 1,403,407.25 897,423.28 1,401,365.74 896,930.03 1,400,595.50 897,689.74 1,401,781.82 898,978.38 1,403,794.10 899,598.46 1,404,762.38 898,227.05 2,225,980.61
32 Generator Set Unit/Jam 400,164.49 548,034.18 399,760.06 547,480.30 399,178.54 546,683.90 398,959.13 546,383.42 399,297.06 546,846.21 399,870.25 547,631.22 400,146.07 548,008.95 399,536.06 913,408.22
33 Hot Recycler Unit/Jam 2,939,407.77 8,619,753.65 2,936,437.04 8,611,042.03 2,932,165.47 8,598,515.76 2,930,553.84 8,593,789.68 2,933,036.05 8,601,068.72 2,937,246.47 8,613,415.67 2,939,272.46 8,619,356.87 2,934,791.63 11,296,393.40
34 Jack Hammer Unit/Jam 55,497.26 55,497.26 55,441.18 55,441.18 55,360.53 55,360.53 55,330.10 55,330.10 55,376.96 55,376.96 55,456.46 55,456.46 55,494.71 55,494.71 55,410.11 106,201.78
35 Launching Gantry Unit/Jam 70,626,598.32 70,626,598.32 70,555,218.99 70,555,218.99 70,452,584.01 70,452,584.01 70,413,860.52 70,413,860.52 70,473,501.93 70,473,501.93 70,574,667.61 70,574,667.61 70,623,347.21 70,623,347.21 70,515,683.96 135,153,879.54
36 Motor Grader > 100 HP Unit/Jam 277,486.32 525,828.07 277,205.88 525,296.64 276,802.64 524,532.50 276,650.49 524,244.20 276,884.82 524,688.24 277,282.29 525,441.43 277,473.55 525,803.86 277,050.55 778,960.65
37 Pedestrian Roller Unit/Jam 91,521.81 91,521.81 91,429.31 91,429.31 91,296.31 91,296.31 91,246.13 91,246.13 91,323.41 91,323.41 91,454.51 91,454.51 91,517.59 91,517.59 91,378.08 175,139.78
38 Pile Driver + Hammer Unit/Jam 104,179.08 304,262.04 104,073.79 303,954.54 103,922.39 303,512.38 103,865.27 303,345.56 103,953.25 303,602.50 104,102.47 304,038.32 104,174.28 304,248.03 104,015.47 399,129.99
39 Rock Drill Breaker Unit/Jam 101,258.17 329,366.17 101,155.83 329,033.29 101,008.68 328,554.66 100,953.16 328,374.07 101,038.67 328,652.21 101,183.71 329,123.99 101,253.51 329,351.01 101,099.15 421,521.45
40 Split Form Paver Unit/Jam 214,199.97 214,199.97 213,983.49 213,983.49 213,672.21 213,672.21 213,554.77 213,554.77 213,735.65 213,735.65 214,042.47 214,042.47 214,190.11 214,190.11 213,863.58 409,901.62
41 Stone Crusher Unit/Jam 573,471.74 719,840.81 572,892.15 719,113.30 572,058.78 718,067.22 571,744.36 717,672.54 572,228.63 718,280.42 573,050.07 719,311.52 573,445.34 719,807.67 572,571.14 1,243,557.63
42 Tamper Unit/Jam 85,679.99 85,679.99 85,593.39 85,593.39 85,468.88 85,468.88 85,421.91 85,421.91 85,494.26 85,494.26 85,616.99 85,616.99 85,676.04 85,676.04 85,545.43 163,960.65
43 Tandem Roller 6-8 T Unit/Jam 413,795.40 413,795.40 413,377.19 413,377.19 412,775.86 412,775.86 412,548.98 412,548.98 412,898.42 412,898.42 413,491.14 413,491.14 413,776.35 413,776.35 413,145.56 791,855.40
44 Three Wheel Roller 6-8 T Unit/Jam 137,282.71 186,848.02 137,143.96 186,659.18 136,944.46 186,387.65 136,869.19 186,285.21 136,985.12 186,442.99 137,181.77 186,710.64 137,276.39 186,839.42 137,067.11 312,197.15
45 Tire Roller 8-10 T Unit/Jam 245,356.33 442,836.83 245,108.36 442,389.27 244,751.80 441,745.74 244,617.28 441,502.94 244,824.47 441,876.90 245,175.92 442,511.22 245,345.04 442,816.45 244,971.01 666,694.04
46 Track Loader 75-100 HP Unit/Jam 229,778.15 418,703.73 229,545.92 418,280.56 229,212.01 417,672.10 229,086.02 417,442.53 229,280.06 417,796.11 229,609.20 418,395.86 229,767.57 418,684.46 229,417.30 628,341.53
47 Trailer 20 Ton Unit/Jam 370,955.40 513,128.39 370,580.49 512,609.79 370,041.42 511,864.11 369,838.03 511,582.77 370,151.29 512,016.09 370,682.64 512,751.10 370,938.33 513,104.77 370,372.84 851,824.79
48 Trailler 15 Ton Unit/Jam 321,299.96 489,028.43 320,975.23 488,534.19 320,508.32 487,823.53 320,332.15 487,555.40 320,603.48 487,968.37 321,063.71 488,668.85 321,285.16 489,005.92 320,795.38 782,317.49
49 Truck Mixer (agitator) Unit/Jam 404,059.03 593,461.60 403,650.67 592,861.82 403,063.49 591,999.40 402,841.95 591,674.01 403,183.16 592,175.16 403,761.94 593,025.24 404,040.43 593,434.29 403,424.49 962,328.63
50 Vibrating Rammer Unit/Jam 82,759.08 82,759.08 82,675.44 82,675.44 82,555.17 82,555.17 82,509.80 82,509.80 82,579.68 82,579.68 82,698.23 82,698.23 82,755.27 82,755.27 82,629.11 158,371.08
51 Vibratory Roller 5-8 T Unit/Jam 199,595.43 428,778.52 199,393.70 428,345.17 199,103.65 427,722.07 198,994.22 427,486.97 199,162.77 427,849.06 199,448.67 428,463.24 199,586.24 428,758.78 199,281.98 610,776.96
52 Water Pump 70-100 MM Unit/Jam 62,312.72 62,312.72 62,249.74 62,249.74 62,159.19 62,159.19 62,125.02 62,125.02 62,177.64 62,177.64 62,266.90 62,266.90 62,309.85 62,309.85 62,214.86 119,244.11
53 Water Tanker 3000-4500 L Unit/Jam 225,883.60 225,883.60 225,655.31 225,655.31 225,327.06 225,327.06 225,203.21 225,203.21 225,393.96 225,393.96 225,717.52 225,717.52 225,873.21 225,873.21 225,528.87 432,259.89
54 Welding Set Unit/Jam 126,572.71 126,572.71 126,444.79 126,444.79 126,260.85 126,260.85 126,191.45 126,191.45 126,298.34 126,298.34 126,479.64 126,479.64 126,566.88 126,566.88 126,373.94 242,214.59
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 220,041.79 430,609.11 219,819.40 430,173.91 219,499.63 429,548.15 219,378.99 429,312.05 219,564.81 429,675.69 219,879.99 430,292.49 220,031.66 430,589.29 219,696.23 631,317.40
HARGA SATUAN DASAR BAHAN KOTA MADIUN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 306,270.37 306,270.37 305,960.84 305,960.84 305,515.76 305,515.76 305,347.84 305,347.84 305,606.47 305,606.47 306,045.17 306,045.17 306,256.27 306,256.27 305,789.39 586,091.22
2 Agregat Pecah Mesin 20-30 mm M3 292,212.06 292,212.06 291,916.73 291,916.73 291,492.09 291,492.09 291,331.87 291,331.87 291,578.63 291,578.63 291,997.20 291,997.20 292,198.61 292,198.61 291,753.16 559,188.67
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 335,391.16 335,391.16 335,052.19 335,052.19 334,564.80 334,564.80 334,380.91 334,380.91 334,664.14 334,664.14 335,144.55 335,144.55 335,375.72 335,375.72 334,864.45 641,817.92
4 Bahan Agr. Base Kelas A M3 321,332.85 321,332.85 321,008.09 321,008.09 320,541.13 320,541.13 320,364.95 320,364.95 320,636.30 320,636.30 321,096.58 321,096.58 321,318.06 321,318.06 320,828.22 614,915.37
5 Bahan Agr. Base Kelas B M3 302,253.71 302,253.71 301,948.24 301,948.24 301,509.00 301,509.00 301,343.28 301,343.28 301,598.52 301,598.52 302,031.47 302,031.47 302,239.80 302,239.80 301,779.04 578,404.77
6 Bahan Agr. Base Kelas C M3 277,149.58 277,149.58 276,869.48 276,869.48 276,466.72 276,466.72 276,314.77 276,314.77 276,548.81 276,548.81 276,945.80 276,945.80 277,136.82 277,136.82 276,714.34 530,364.51
7 Bahan Agr. Base Kelas C2 M3 253,049.62 253,049.62 252,793.87 252,793.87 252,426.14 252,426.14 252,287.39 252,287.39 252,501.09 252,501.09 252,863.55 252,863.55 253,037.97 253,037.97 252,652.22 484,245.86
8 Bahan Agr. Base Kelas S M3 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26 204,527.99 392,008.55
9 Bahan Pilihan M3 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26 204,527.99 392,008.55
10 Bahan Tanah Timbunan M3 116,483.16 116,483.16 116,365.43 116,365.43 116,196.16 116,196.16 116,132.29 116,132.29 116,230.66 116,230.66 116,397.51 116,397.51 116,477.80 116,477.80 116,300.23 222,906.82
11 Batu Belah/Kerakal M3 330,370.33 330,370.33 330,036.44 330,036.44 329,556.35 329,556.35 329,375.21 329,375.21 329,654.19 329,654.19 330,127.42 330,127.42 330,355.13 330,355.13 329,851.51 632,209.87
12 Batu Kali M3 363,507.78 363,507.78 363,140.40 363,140.40 362,612.15 362,612.15 362,412.85 362,412.85 362,719.81 362,719.81 363,240.50 363,240.50 363,491.05 363,491.05 362,936.92 695,623.02
13 Chipping M3 216,899.67 216,899.67 216,680.46 216,680.46 216,365.26 216,365.26 216,246.34 216,246.34 216,429.50 216,429.50 216,740.19 216,740.19 216,889.69 216,889.69 216,559.05 415,067.88
14 Chipping (kg) Kg 309.28 309.28 308.97 308.97 308.52 308.52 308.35 308.35 308.61 308.61 309.06 309.06 309.27 309.27 308.80 591.86
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 388,611.91 388,611.91 388,219.16 388,219.16 387,654.43 387,654.43 387,441.36 387,441.36 387,769.52 387,769.52 388,326.17 388,326.17 388,594.02 388,594.02 388,001.62 743,663.28
18 Kapur M3 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
19 Pasir Beton (Kasar) M3 462,920.13 462,920.13 462,452.28 462,452.28 461,779.56 461,779.56 461,525.75 461,525.75 461,916.67 461,916.67 462,579.76 462,579.76 462,898.83 462,898.83 462,193.15 885,862.46
20 Pasir Halus (untuk HRS) M3 292,212.06 292,212.06 291,916.73 291,916.73 291,492.09 291,492.09 291,331.87 291,331.87 291,578.63 291,578.63 291,997.20 291,997.20 292,198.61 292,198.61 291,753.16 559,188.67
21 Pasir Pasang (Sedang) M3 327,357.84 327,357.84 327,026.99 327,026.99 326,551.27 326,551.27 326,371.79 326,371.79 326,648.23 326,648.23 327,117.14 327,117.14 327,342.77 327,342.77 326,843.75 626,445.04
22 Pasir Urug M3 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
23 Pasir Urug (ada unsur lempung) M3 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43 155,401.17 297,849.63
24 Sirtu M3 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
26 Anti Pengelupas Liter 98,408.18 98,408.18 98,308.73 98,308.73 98,165.72 98,165.72 98,111.76 98,111.76 98,194.87 98,194.87 98,335.83 98,335.83 98,403.65 98,403.65 98,253.64 188,317.83
27 Arbocell Kg 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,388.94 9,388.94 9,379.46 9,379.46 9,365.81 9,365.81 9,360.66 9,360.66 9,368.59 9,368.59 9,382.04 9,382.04 9,388.51 9,388.51 9,374.20 17,967.06
30 Aspal Emulsi (CSS-1) Kg 9,388.94 9,388.94 9,379.46 9,379.46 9,365.81 9,365.81 9,360.66 9,360.66 9,368.59 9,368.59 9,382.04 9,382.04 9,388.51 9,388.51 9,374.20 17,967.06
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 574,445.37 574,445.37 573,864.81 573,864.81 573,030.02 573,030.02 572,715.06 572,715.06 573,200.16 573,200.16 574,022.99 574,022.99 574,418.93 574,418.93 573,543.25 1,099,281.61
41 Beton K-125 (fc' 10 MPa) M3 593,918.10 593,918.10 593,317.85 593,317.85 592,454.77 592,454.77 592,129.13 592,129.13 592,630.67 592,630.67 593,481.40 593,481.40 593,890.76 593,890.76 592,985.39 1,136,545.40
42 Beton K-175 (fc' 15 MPa) M3 642,599.91 642,599.91 641,950.46 641,950.46 641,016.63 641,016.63 640,664.30 640,664.30 641,206.95 641,206.95 642,127.42 642,127.42 642,570.33 642,570.33 641,590.75 1,229,704.86
43 Beton K-250 (fc' 20 MPa) M3 715,622.63 715,622.63 714,899.38 714,899.38 713,859.43 713,859.43 713,467.07 713,467.07 714,071.38 714,071.38 715,096.44 715,096.44 715,589.69 715,589.69 714,498.79 1,369,444.04
44 Beton K-300 (fc' 25 MPa) M3 744,831.71 744,831.71 744,078.94 744,078.94 742,996.55 742,996.55 742,588.17 742,588.17 743,217.15 743,217.15 744,284.05 744,284.05 744,797.43 744,797.43 743,662.01 1,425,339.72
45 Beton K-350 (fc' 30 MPa) M3 774,040.80 774,040.80 773,258.51 773,258.51 772,133.67 772,133.67 771,709.28 771,709.28 772,362.92 772,362.92 773,471.66 773,471.66 774,005.17 774,005.17 772,825.22 1,481,235.39
46 Beton K-400 (fc' 35 MPa) M3 803,249.89 803,249.89 802,438.08 802,438.08 801,270.79 801,270.79 800,830.38 800,830.38 801,508.69 801,508.69 802,659.27 802,659.27 803,212.91 803,212.91 801,988.44 1,537,131.07
47 Beton K-450 (fc' 40 MPa) M3 842,195.34 842,195.34 841,344.17 841,344.17 840,120.28 840,120.28 839,658.52 839,658.52 840,369.72 840,369.72 841,576.08 841,576.08 842,156.57 842,156.57 840,872.73 1,611,658.64
48 Beton K-500 (fc' 45 MPa) M3 876,272.60 876,272.60 875,386.99 875,386.99 874,113.59 874,113.59 873,633.14 873,633.14 874,373.12 874,373.12 875,628.29 875,628.29 876,232.27 876,232.27 874,896.48 1,676,870.26
49 Bunker Oil Liter 5,020.83 5,020.83 5,015.75 5,015.75 5,008.46 5,008.46 5,005.70 5,005.70 5,009.94 5,009.94 5,017.13 5,017.13 5,020.59 5,020.59 5,012.94 9,608.05
50 Cat Kg 72,801.97 72,801.97 72,728.40 72,728.40 72,622.60 72,622.60 72,582.68 72,582.68 72,644.16 72,644.16 72,748.44 72,748.44 72,798.62 72,798.62 72,687.64 139,316.76
51 Cat Anti Karat Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
52 Cat Marka (Non Thermoplas) Kg 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
53 Cat Marka (Thermoplastic) Kg 54,727.00 54,727.00 54,671.69 54,671.69 54,592.16 54,592.16 54,562.15 54,562.15 54,608.37 54,608.37 54,686.76 54,686.76 54,724.48 54,724.48 54,641.06 104,727.77
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,444,993.65 1,444,993.65 1,443,533.26 1,443,533.26 1,441,433.38 1,441,433.38 1,440,641.12 1,440,641.12 1,441,861.36 1,441,861.36 1,443,931.17 1,443,931.17 1,444,927.14 1,444,927.14 1,442,724.39 2,765,197.57
57 Curing Compound Liter 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 593,461.60 593,461.60 592,861.82 592,861.82 591,999.40 591,999.40 591,674.01 591,674.01 592,175.16 592,175.16 593,025.24 593,025.24 593,434.29 593,434.29 592,529.61 1,135,671.83
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 690,865.62 690,865.62 690,167.39 690,167.39 689,163.43 689,163.43 688,784.63 688,784.63 689,368.04 689,368.04 690,357.64 690,357.64 690,833.82 690,833.82 689,780.67 1,322,068.05
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 876,636.18 876,636.18 875,750.20 875,750.20 874,476.26 874,476.26 873,995.62 873,995.62 874,735.90 874,735.90 875,991.60 875,991.60 876,595.82 876,595.82 875,259.48 1,677,566.00
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
64 Oxygen (Isi 6 M3) Botol 166,691.42 166,691.42 166,522.95 166,522.95 166,280.71 166,280.71 166,189.32 166,189.32 166,330.08 166,330.08 166,568.85 166,568.85 166,683.74 166,683.74 166,429.64 318,987.35
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,343,572.97 1,343,572.97 1,342,215.08 1,342,215.08 1,340,262.59 1,340,262.59 1,339,525.93 1,339,525.93 1,340,660.53 1,340,660.53 1,342,585.06 1,342,585.06 1,343,511.12 1,343,511.12 1,341,462.98 2,571,114.90
67 Seal Coat M2 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 205,612.33
68 Seal Guard Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
69 Semen/PC (50 kg) Zak 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
78 Baja Tulangan (Polos) U32 Kg 10,798.79 10,798.79 10,787.88 10,787.88 10,772.19 10,772.19 10,766.26 10,766.26 10,775.38 10,775.38 10,790.85 10,790.85 10,798.29 10,798.29 10,781.83 20,665.00
79 Baja Tulangan (Polos) U36 Kg 10,798.79 10,798.79 10,787.88 10,787.88 10,772.19 10,772.19 10,766.26 10,766.26 10,775.38 10,775.38 10,790.85 10,790.85 10,798.29 10,798.29 10,781.83 20,665.00
80 Baja Tulangan (Ulir) D16 Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
81 Baja Tulangan (Ulir) D19 Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
82 Baja Tulangan (Ulir) D24 Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
83 Baja Tulangan (Ulir) D32 Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
84 Baja Tulangan (Ulir) D36 Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,657,501.73 12,657,501.73 12,644,709.32 12,644,709.32 12,626,315.37 12,626,315.37 12,619,375.45 12,619,375.45 12,630,064.22 12,630,064.22 12,648,194.85 12,648,194.85 12,656,919.07 12,656,919.07 12,637,623.96 24,221,900.87
87 Box Culvert Type DUB 200×200 M' 13,435,729.72 13,435,729.72 13,422,150.79 13,422,150.79 13,402,625.91 13,402,625.91 13,395,259.30 13,395,259.30 13,406,605.25 13,406,605.25 13,425,850.62 13,425,850.62 13,435,111.24 13,435,111.24 13,414,629.80 25,711,149.04
88 Box Culvert Type uk 300×200 M' 14,507,173.93 14,507,173.93 14,492,512.14 14,492,512.14 14,471,430.23 14,471,430.23 14,463,476.17 14,463,476.17 14,475,726.91 14,475,726.91 14,496,507.02 14,496,507.02 14,506,506.13 14,506,506.13 14,484,391.39 27,761,507.49
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 188,783.05 188,783.05 188,592.25 188,592.25 188,317.91 188,317.91 188,214.41 188,214.41 188,373.83 188,373.83 188,644.24 188,644.24 188,774.36 188,774.36 188,486.58 361,262.78
91 Ducting (Strand Prestress) M' 164,683.08 164,683.08 164,516.65 164,516.65 164,277.33 164,277.33 164,187.03 164,187.03 164,326.10 164,326.10 164,562.00 164,562.00 164,675.50 164,675.50 164,424.46 315,144.13
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,118,788.47 2,118,788.47 2,116,647.10 2,116,647.10 2,113,568.06 2,113,568.06 2,112,406.36 2,112,406.36 2,114,195.60 2,114,195.60 2,117,230.55 2,117,230.55 2,118,690.94 2,118,690.94 2,115,461.05 4,054,598.24
94 Expansion Join Tipe Rubber M' 1,534,364.35 1,534,364.35 1,532,813.63 1,532,813.63 1,530,583.89 1,530,583.89 1,529,742.62 1,529,742.62 1,531,038.33 1,531,038.33 1,533,236.15 1,533,236.15 1,534,293.72 1,534,293.72 1,531,954.73 2,936,220.91
95 Expansion Join Tipe Torma M' 1,759,297.34 1,759,297.34 1,757,519.30 1,757,519.30 1,754,962.68 1,754,962.68 1,753,998.08 1,753,998.08 1,755,483.74 1,755,483.74 1,758,003.76 1,758,003.76 1,759,216.36 1,759,216.36 1,756,534.49 3,366,661.67
96 Expansion Tipe Joint Asphaltic Plug M' 2,086,655.18 2,086,655.18 2,084,546.29 2,084,546.29 2,081,513.95 2,081,513.95 2,080,369.87 2,080,369.87 2,082,131.97 2,082,131.97 2,085,120.90 2,085,120.90 2,086,559.13 2,086,559.13 2,083,378.23 3,993,106.70
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
99 Glass Bead Kg 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
100 Joint Sealent Kg 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
101 Joint Socket Pile 16×16×16 Set 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
102 Joint Socket Pile 35×35 Set 761,157.18 761,157.18 760,387.91 760,387.91 759,281.80 759,281.80 758,864.47 758,864.47 759,507.23 759,507.23 760,597.52 760,597.52 761,122.15 761,122.15 759,961.84 1,456,580.79
103 Kawat Beton Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
104 Kawat Bronjong Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
105 Kawat Las Dos 175,728.90 175,728.90 175,551.30 175,551.30 175,295.93 175,295.93 175,199.58 175,199.58 175,347.98 175,347.98 175,599.69 175,599.69 175,720.81 175,720.81 175,452.93 336,281.84
106 Kayu Acuan (Kelas III/Meranti) M3 4,186,364.51 4,186,364.51 4,182,133.53 4,182,133.53 4,176,049.88 4,176,049.88 4,173,754.56 4,173,754.56 4,177,289.78 4,177,289.78 4,183,286.34 4,183,286.34 4,186,171.81 4,186,171.81 4,179,790.11 8,011,194.35
107 Kayu Perancah (Gelam) M3 3,279,402.55 3,279,402.55 3,276,088.20 3,276,088.20 3,271,322.55 3,271,322.55 3,269,524.50 3,269,524.50 3,272,293.83 3,272,293.83 3,276,991.25 3,276,991.25 3,279,251.59 3,279,251.59 3,274,252.47 6,275,595.71
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 176,788.17
110 Marmer Nama Jembatan Buah 584,424.12 584,424.12 583,833.46 583,833.46 582,984.18 582,984.18 582,663.75 582,663.75 583,157.27 583,157.27 583,994.40 583,994.40 584,397.22 584,397.22 583,506.32 1,118,377.34
111 Mata Kucing Buah 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
112 Matras Concrete (Tebal=10 cm) M2 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 272,868.70
113 Mini Pile 16×16×16 M' 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
114 Mini Timber Pile Buah 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
115 Multipleks 12 mm Lbr 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43 155,401.17 297,849.63
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 176,788.17
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,725,473.13 64,725,473.13 64,660,057.81 64,660,057.81 64,565,998.38 64,565,998.38 64,530,510.39 64,530,510.39 64,585,168.53 64,585,168.53 64,677,881.42 64,677,881.42 64,722,493.66 64,722,493.66 64,623,826.09 123,861,250.66
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 91,694,336.58 91,694,336.58 91,601,664.97 91,601,664.97 91,468,414.23 91,468,414.23 91,418,139.62 91,418,139.62 91,495,571.91 91,495,571.91 91,626,915.06 91,626,915.06 91,690,115.67 91,690,115.67 91,550,336.74 175,469,944.97
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 175,254,935.44 175,254,935.44 175,077,812.64 175,077,812.64 174,823,131.16 174,823,131.16 174,727,041.54 174,727,041.54 174,875,037.51 174,875,037.51 175,126,073.02 175,126,073.02 175,246,868.04 175,246,868.04 174,979,709.26 335,374,844.56
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 229,818,257.24 229,818,257.24 229,585,989.58 229,585,989.58 229,252,016.37 229,252,016.37 229,126,010.51 229,126,010.51 229,320,083.08 229,320,083.08 229,649,275.20 229,649,275.20 229,807,678.15 229,807,678.15 229,457,343.00 439,789,396.55
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 292,958,153.59 292,958,153.59 292,662,073.10 292,662,073.10 292,236,344.63 292,236,344.63 292,075,720.12 292,075,720.12 292,323,111.87 292,323,111.87 292,742,745.70 292,742,745.70 292,944,668.03 292,944,668.03 292,498,082.36 560,616,424.17
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 353,453,078.94 353,453,078.94 353,095,858.76 353,095,858.76 352,582,218.72 352,582,218.72 352,388,425.76 352,388,425.76 352,686,903.12 352,686,903.12 353,193,190.01 353,193,190.01 353,436,808.65 353,436,808.65 352,898,004.47 676,381,929.62
124 Pelat Rambu (Eng. Grade) Buah 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26 204,527.99 392,008.55
125 Pelat Rambu (High L Grade) Buah 238,991.31 238,991.31 238,749.77 238,749.77 238,402.46 238,402.46 238,271.43 238,271.43 238,473.25 238,473.25 238,815.58 238,815.58 238,980.30 238,980.30 238,615.99 457,343.31
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
128 Pipa Drainase Baja Dia 3" M' 268,112.10 268,112.10 267,841.13 267,841.13 267,451.50 267,451.50 267,304.50 267,304.50 267,530.91 267,530.91 267,914.96 267,914.96 268,099.75 268,099.75 267,691.04 513,070.01
129 Pipa Galvanis Dia 1,5" M' 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 203,690.72
130 Pipa Galvanis Dia 2" M' 306,270.37 306,270.37 305,960.84 305,960.84 305,515.76 305,515.76 305,347.84 305,347.84 305,606.47 305,606.47 306,045.17 306,045.17 306,256.27 306,256.27 305,789.39 586,091.22
131 Pipa Galvanis Dia 3" M' 234,974.65 234,974.65 234,737.17 234,737.17 234,395.70 234,395.70 234,266.87 234,266.87 234,465.29 234,465.29 234,801.87 234,801.87 234,963.83 234,963.83 234,605.63 449,656.87
132 Pipa Porus M' 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
133 Pipa PVC Dia 4" M' 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 220,985.21
134 Plastik Filter M2 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
135 Rel Pengaman M' 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,000,296.98 2,000,296.98 1,998,275.36 1,998,275.36 1,995,368.52 1,995,368.52 1,994,271.79 1,994,271.79 1,995,960.96 1,995,960.96 1,998,826.19 1,998,826.19 2,000,204.90 2,000,204.90 1,997,155.65 3,827,848.20
137 Strip Bearing Buah 306,270.37 306,270.37 305,960.84 305,960.84 305,515.76 305,515.76 305,347.84 305,347.84 305,606.47 305,606.47 306,045.17 306,045.17 306,256.27 306,256.27 305,789.39 586,091.22
138 Tiang Pancang Baja Diameter 400 M' 708,940.60 708,940.60 708,224.10 708,224.10 707,193.86 707,193.86 706,805.16 706,805.16 707,403.83 707,403.83 708,419.32 708,419.32 708,907.96 708,907.96 707,827.25 1,356,657.04
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 865,590.36 865,590.36 864,715.54 864,715.54 863,457.66 863,457.66 862,983.07 862,983.07 863,714.03 863,714.03 864,953.90 864,953.90 865,550.51 865,550.51 864,231.01 1,656,428.29
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,810,509.77 1,810,509.77 1,808,679.96 1,808,679.96 1,806,048.92 1,806,048.92 1,805,056.24 1,805,056.24 1,806,585.15 1,806,585.15 1,809,178.53 1,809,178.53 1,810,426.42 1,810,426.42 1,807,666.48 3,464,663.81
HARGA SATUAN DASAR UPAH KOTA KEDIRI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
2 Tukang OH 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
3 Mandor OH 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
4 Operator OH 317,000 317,000 317,857.69 317,857.69 318,295.89 318,295.89 318,304.75 318,304.75 317,884.35 317,884.35 317,430.28 317,430.28 317,361.56 317,361.56 317,734.12 317,734.12 318,196.21 318,196.21
5 Pembantu Operator OH 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
6 Sopir OH 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
7 Pembantu Sopir OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
8 Mekanik OH 178,000 178,000 178,481.61 178,481.61 178,727.66 178,727.66 178,732.63 178,732.63 178,496.57 178,496.57 178,241.61 178,241.61 178,203.02 178,203.02 178,412.22 178,412.22 178,671.69 178,671.69
9 Pembantu Mekanik OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
10 Kepala Tukang OH 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
11 Pemasak Aspal OH 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48

HARGA SATUAN DASAR ALAT KOTA KEDIRI TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 465,986 520,000 467,246.57 521,406.94 467,890.71 522,125.75 467,903.73 522,140.28 467,285.75 521,450.66 466,618.27 520,705.82 466,517.26 520,593.10 467,064.92 521,204.24 467,744.19 521,962.24
2 Asphalt Distribution Unit/Jam 286,913 369,000 287,688.97 369,998.39 288,085.57 370,508.46 288,093.59 370,518.78 287,713.09 370,029.41 287,302.12 369,500.86 287,239.93 369,420.87 287,577.13 369,854.54 287,995.36 370,392.44
3 Asphalt Finisher Unit/Jam 210,732 999,000 211,302.59 1,001,702.95 211,593.89 1,003,083.88 211,599.78 1,003,111.81 211,320.31 1,001,786.95 211,018.45 1,000,355.98 210,972.77 1,000,139.43 211,220.44 1,001,313.52 211,527.63 1,002,769.77
4 Asphalt Liquid Mixer Unit/Jam 75,191 138,000 75,394.35 138,373.38 75,498.29 138,564.14 75,500.39 138,568.00 75,400.67 138,384.98 75,292.97 138,187.31 75,276.67 138,157.40 75,365.04 138,319.59 75,474.65 138,520.75
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 100,914 100,914 101,187.15 101,187.15 101,326.65 101,326.65 101,329.47 101,329.47 101,195.64 101,195.64 101,051.09 101,051.09 101,029.22 101,029.22 101,147.82 101,147.82 101,294.92 101,294.92
6 Asphalt Mixing Plant Unit/Jam 1,127,864 5,861,846 1,130,915.26 5,877,706.12 1,132,474.33 5,885,809.06 1,132,505.85 5,885,972.91 1,131,010.10 5,878,199.02 1,129,394.55 5,869,802.52 1,129,150.06 5,868,531.86 1,130,475.60 5,875,421.09 1,132,119.70 5,883,965.95
7 Asphalt Sprayer Unit/Jam 92,999 92,999 93,250.91 93,250.91 93,379.46 93,379.46 93,382.06 93,382.06 93,258.73 93,258.73 93,125.52 93,125.52 93,105.36 93,105.36 93,214.65 93,214.65 93,350.22 93,350.22
8 Asphalt Tanker Unit/Jam 435,316 505,000 436,493.61 506,366.35 437,095.35 507,064.43 437,107.52 507,078.54 436,530.21 506,408.82 435,906.67 505,685.46 435,812.30 505,575.99 436,323.92 506,169.50 436,958.48 506,905.64
9 Blending Equipment Unit/Jam 141,478 224,000 141,860.42 224,606.07 142,055.99 224,915.71 142,059.94 224,921.97 141,872.32 224,624.90 141,669.67 224,304.04 141,639.00 224,255.49 141,805.27 224,518.75 142,011.51 224,845.27
10 Bore Pile Machine Unit/Jam 389,806 678,000 390,860.19 679,834.43 391,399.02 680,771.64 391,409.92 680,790.60 390,892.96 679,891.44 390,334.61 678,920.28 390,250.11 678,773.31 390,708.23 679,570.14 391,276.46 680,558.46
11 Bore Pile Machine Dia 60 Unit/Jam 255,253 772,000 255,943.98 774,088.76 256,296.82 775,155.91 256,303.96 775,177.49 255,965.44 774,153.68 255,599.82 773,047.87 255,544.49 772,880.52 255,844.48 773,787.83 256,216.56 774,913.18
12 Bore Pile Machine Dia 80 Unit/Jam 1,009,141 1,009,141 1,011,871.55 1,011,871.55 1,013,266.50 1,013,266.50 1,013,294.71 1,013,294.71 1,011,956.40 1,011,956.40 1,010,510.91 1,010,510.91 1,010,292.16 1,010,292.16 1,011,478.17 1,011,478.17 1,012,949.20 1,012,949.20
13 Bulldozer 100-150 HP Unit/Jam 395,742 574,000 396,812.37 575,553.04 397,359.41 576,346.50 397,370.47 576,362.54 396,845.65 575,601.31 396,278.79 574,779.11 396,193.00 574,654.69 396,658.11 575,329.29 397,234.98 576,166.02
14 Cement Tanker Unit/Jam 368,040 475,000 369,035.51 476,285.19 369,544.25 476,941.79 369,554.54 476,955.06 369,066.45 476,325.13 368,539.27 475,644.74 368,459.49 475,541.77 368,892.04 476,100.02 369,428.53 476,792.43
15 Cold Milling Unit/Jam 574,815 1,398,470 576,369.97 1,402,253.77 577,164.55 1,404,186.91 577,180.61 1,404,225.99 576,418.30 1,402,371.37 575,594.94 1,400,368.20 575,470.34 1,400,065.06 576,145.90 1,401,708.63 576,983.81 1,403,747.19
16 Cold Recycler Unit/Jam 4,840,910 4,841,000 4,854,007.33 4,854,098.07 4,860,699.01 4,860,789.87 4,860,834.32 4,860,925.18 4,854,414.38 4,854,505.13 4,847,480.27 4,847,570.89 4,846,430.92 4,846,521.51 4,852,120.28 4,852,210.98 4,859,176.91 4,859,267.74
17 Compressor 4000-6500 L\M Unit/Jam 147,414 159,943 147,812.61 160,375.75 148,016.38 160,596.84 148,020.50 160,601.31 147,825.00 160,389.20 147,613.85 160,160.10 147,581.89 160,125.43 147,755.14 160,313.40 147,970.03 160,546.55
18 Concrete Breaker Unit/Jam 537,219 1,024,000 538,672.79 1,026,770.59 539,415.40 1,028,186.08 539,430.42 1,028,214.71 538,717.97 1,026,856.69 537,948.45 1,025,389.92 537,832.00 1,025,167.95 538,463.38 1,026,371.42 539,246.49 1,027,864.11
19 Concrete Mixer (350) Unit/Jam 99,925 99,925 100,195.12 100,195.12 100,333.25 100,333.25 100,336.04 100,336.04 100,203.53 100,203.53 100,060.39 100,060.39 100,038.73 100,038.73 100,156.17 100,156.17 100,301.83 100,301.83
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 113,776 113,776 114,083.56 114,083.56 114,240.83 114,240.83 114,244.01 114,244.01 114,093.12 114,093.12 113,930.15 113,930.15 113,905.49 113,905.49 114,039.21 114,039.21 114,205.06 114,205.06
21 Concrete Pan Mixer Unit/Jam 302,742 648,000 303,561.46 649,753.26 303,979.95 650,649.01 303,988.41 650,667.12 303,586.92 649,807.75 303,153.27 648,879.56 303,087.65 648,739.09 303,443.45 649,500.66 303,884.76 650,445.26
22 Concrete Pump Unit/Jam 230,520 247,740 231,143.21 248,410.30 231,461.86 248,752.75 231,468.30 248,759.68 231,162.59 248,431.13 230,832.39 248,076.27 230,782.42 248,022.57 231,053.35 248,313.73 231,389.38 248,674.86
23 Concrete Vibrator Unit/Jam 86,074 86,074 86,306.69 86,306.69 86,425.67 86,425.67 86,428.08 86,428.08 86,313.93 86,313.93 86,190.64 86,190.64 86,171.98 86,171.98 86,273.14 86,273.14 86,398.61 86,398.61
24 Crane 10-15 Ton Unit/Jam 308,678 387,155 309,513.65 388,202.51 309,940.34 388,737.68 309,948.97 388,748.50 309,539.61 388,235.06 309,097.45 387,680.50 309,030.54 387,596.58 309,393.32 388,051.59 309,843.29 388,615.95
25 Crane On Track 35 Ton Unit/Jam 256,243 487,000 256,936.01 488,317.65 257,290.22 488,990.84 257,297.38 489,004.45 256,957.56 488,358.60 256,590.52 487,661.02 256,534.97 487,555.46 256,836.12 488,127.81 257,209.65 488,837.72
26 Crane On Track 75-100 Ton Unit/Jam 402,667 610,000 403,756.59 611,650.45 404,313.20 612,493.66 404,324.46 612,510.71 403,790.45 611,701.74 403,213.67 610,827.98 403,126.38 610,695.75 403,599.62 611,412.66 404,186.59 612,301.86
27 Dump Truck 10 Ton Unit/Jam 380,901 410,000 381,931.91 411,109.32 382,458.43 411,676.07 382,469.08 411,687.53 381,963.94 411,143.79 381,418.33 410,556.51 381,335.77 410,467.63 381,783.43 410,949.49 382,338.67 411,547.15
28 Dump Truck 3-4 M3 Unit/Jam 207,764 263,345 208,326.49 264,057.52 208,613.69 264,421.55 208,619.50 264,428.91 208,343.96 264,079.66 208,046.36 263,702.45 208,001.33 263,645.36 208,245.51 263,954.86 208,548.37 264,338.74
29 Excavator 80-140 HP Unit/Jam 300,764 456,861 301,577.40 458,097.11 301,993.15 458,728.63 302,001.56 458,741.40 301,602.69 458,135.52 301,171.88 457,481.12 301,106.68 457,382.08 301,460.16 457,919.02 301,898.59 458,584.99
30 Flat Bed Truck 3-4 M3 Unit/Jam 365,072 488,000 366,059.41 489,320.36 366,564.06 489,994.93 366,574.26 490,008.57 366,090.11 489,361.39 365,567.18 488,662.38 365,488.05 488,556.60 365,917.10 489,130.13 366,449.27 489,841.49
31 Fulvi Mixer Unit/Jam 914,163 1,428,000 916,636.58 1,431,863.67 917,900.24 1,433,837.62 917,925.79 1,433,877.54 916,713.45 1,431,983.75 915,404.00 1,429,938.28 915,205.84 1,429,628.74 916,280.22 1,431,307.02 917,612.81 1,433,388.63
32 Generator Set Unit/Jam 406,625 549,207 407,724.71 550,692.96 408,286.80 551,452.14 408,298.16 551,467.49 407,758.90 550,739.14 407,176.45 549,952.46 407,088.31 549,833.41 407,566.20 550,478.88 408,158.94 551,279.46
33 Hot Recycler Unit/Jam 2,986,860 8,759,000 2,994,941.37 8,782,698.82 2,999,070.16 8,794,806.54 2,999,153.65 8,795,051.37 2,995,192.52 8,783,435.32 2,990,914.15 8,770,888.95 2,990,266.70 8,768,990.27 2,993,777.05 8,779,284.44 2,998,131.02 8,792,052.50
34 Jack Hammer Unit/Jam 56,393 56,393 56,545.76 56,545.76 56,623.72 56,623.72 56,625.29 56,625.29 56,550.50 56,550.50 56,469.73 56,469.73 56,457.50 56,457.50 56,523.78 56,523.78 56,605.98 56,605.98
35 Launching Gantry Unit/Jam 71,766,756 71,766,756 71,960,931.51 71,960,931.51 72,060,136.02 72,060,136.02 72,062,142.00 72,062,142.00 71,966,966.05 71,966,966.05 71,864,167.49 71,864,167.49 71,848,610.74 71,848,610.74 71,932,955.84 71,932,955.84 72,037,570.79 72,037,570.79
36 Motor Grader > 100 HP Unit/Jam 281,966 529,921 282,728.81 531,354.78 283,118.58 532,087.30 283,126.46 532,102.11 282,752.52 531,399.34 282,348.64 530,640.28 282,287.52 530,525.41 282,618.90 531,148.21 283,029.92 531,920.68
37 Pedestrian Roller Unit/Jam 92,999 92,999 93,250.91 93,250.91 93,379.46 93,379.46 93,382.06 93,382.06 93,258.73 93,258.73 93,125.52 93,125.52 93,105.36 93,105.36 93,214.65 93,214.65 93,350.22 93,350.22
38 Pile Driver + Hammer Unit/Jam 105,861 310,000 106,147.31 310,838.75 106,293.64 311,267.27 106,296.60 311,275.94 106,156.21 310,864.82 106,004.58 310,420.78 105,981.63 310,353.58 106,106.04 310,717.91 106,260.36 311,169.80
39 Rock Drill Breaker Unit/Jam 102,893 334,000 103,171.22 334,903.69 103,313.45 335,365.38 103,316.32 335,374.72 103,179.87 334,931.77 103,032.48 334,453.35 103,010.18 334,380.95 103,131.11 334,773.49 103,281.10 335,260.36
40 Split Form Paver Unit/Jam 217,658 217,658 218,246.80 218,246.91 218,547.68 218,547.78 218,553.76 218,553.86 218,265.11 218,265.21 217,953.33 217,953.44 217,906.15 217,906.25 218,161.96 218,162.06 218,479.24 218,479.34
41 Stone Crusher Unit/Jam 582,730 852,000 584,306.22 854,305.22 585,111.73 855,482.95 585,128.02 855,506.77 584,355.22 854,376.86 583,520.52 853,156.45 583,394.20 852,971.77 584,079.06 853,973.10 584,928.51 855,215.06
42 Tamper Unit/Jam 87,063 87,063 87,298.72 87,298.72 87,419.07 87,419.07 87,421.50 87,421.50 87,306.04 87,306.04 87,181.33 87,181.33 87,162.46 87,162.46 87,264.78 87,264.78 87,391.70 87,391.70
43 Tandem Roller 6-8 T Unit/Jam 420,475 491,000 421,613.14 492,328.48 422,194.38 493,007.19 422,206.13 493,020.92 421,648.50 492,369.76 421,046.21 491,666.45 420,955.07 491,560.02 421,449.24 492,137.08 422,062.17 492,852.81
44 Three Wheel Roller 6-8 T Unit/Jam 139,499 192,347 139,876.36 192,867.42 140,069.19 193,133.31 140,073.09 193,138.69 139,888.09 192,883.60 139,688.27 192,608.08 139,658.03 192,566.39 139,821.98 192,792.44 140,025.33 193,072.83
45 Tire Roller 8-10 T Unit/Jam 249,317 450,000 249,991.79 451,217.54 250,336.43 451,839.59 250,343.40 451,852.17 250,012.76 451,255.38 249,655.64 450,610.80 249,601.59 450,513.26 249,894.61 451,042.13 250,258.04 451,698.10
46 Track Loader 75-100 HP Unit/Jam 233,488 423,241 234,119.30 424,386.14 234,442.05 424,971.20 234,448.58 424,983.03 234,138.93 424,421.73 233,804.48 423,815.48 233,753.87 423,723.74 234,028.28 424,221.16 234,368.64 424,838.12
47 Trailer 20 Ton Unit/Jam 376,944 521,390 377,963.78 522,800.70 378,484.84 523,521.43 378,495.38 523,536.00 377,995.48 522,844.54 377,455.55 522,097.70 377,373.84 521,984.68 377,816.85 522,597.46 378,366.32 523,357.49
48 Trailler 15 Ton Unit/Jam 326,487 535,000 327,370.21 536,447.52 327,821.52 537,187.06 327,830.64 537,202.02 327,397.66 536,492.51 326,930.00 535,726.18 326,859.23 535,610.21 327,242.94 536,238.97 327,718.86 537,018.85
49 Truck Mixer (agitator) Unit/Jam 410,582 672,000 411,692.84 673,818.20 412,260.39 674,747.12 412,271.87 674,765.90 411,727.36 673,874.70 411,139.24 672,912.13 411,050.24 672,766.46 411,532.78 673,556.24 412,131.29 674,535.82
50 Vibrating Rammer Unit/Jam 84,095 84,095 84,322.63 84,322.63 84,438.88 84,438.88 84,441.23 84,441.23 84,329.70 84,329.70 84,209.24 84,209.24 84,191.01 84,191.01 84,289.85 84,289.85 84,412.43 84,412.43
51 Vibratory Roller 5-8 T Unit/Jam 202,818 435,000 203,366.34 436,176.96 203,646.70 436,778.27 203,652.37 436,790.43 203,383.39 436,213.54 203,092.88 435,590.44 203,048.91 435,496.15 203,287.28 436,007.39 203,582.93 436,641.49
52 Water Pump 70-100 MM Unit/Jam 63,319 63,319 63,489.98 63,489.98 63,577.51 63,577.51 63,579.28 63,579.28 63,495.30 63,495.30 63,404.61 63,404.61 63,390.88 63,390.88 63,465.30 63,465.30 63,557.60 63,557.60
53 Water Tanker 3000-4500 L Unit/Jam 229,530 229,943 230,151.18 230,565.15 230,468.46 230,883.00 230,474.87 230,889.43 230,170.48 230,584.48 229,841.70 230,255.11 229,791.94 230,205.27 230,061.70 230,475.51 230,396.29 230,810.70
54 Welding Set Unit/Jam 128,616 128,616 128,964.02 128,964.02 129,141.81 129,141.81 129,145.40 129,145.40 128,974.84 128,974.84 128,790.61 128,790.61 128,762.73 128,762.73 128,913.88 128,913.88 129,101.37 129,101.37
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 223,594 435,097 224,198.99 436,274.22 224,508.07 436,875.66 224,514.32 436,887.83 224,217.79 436,310.81 223,897.52 435,687.57 223,849.05 435,593.26 224,111.83 436,104.61 224,437.76 436,738.86
HARGA SATUAN DASAR BAHAN KOTA KEDIRI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
2 Agregat Pecah Mesin 20-30 mm M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
4 Bahan Agr. Base Kelas A M3 326,000 326,000 326,882.04 326,882.04 327,332.68 327,332.68 327,341.79 327,341.79 326,909.45 326,909.45 326,442.49 326,442.49 326,371.83 326,371.83 326,754.96 326,754.96 327,230.18 327,230.18
5 Bahan Agr. Base Kelas B M3 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
6 Bahan Agr. Base Kelas C M3 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
7 Bahan Agr. Base Kelas C2 M3 257,000 257,000 257,695.35 257,695.35 258,050.61 258,050.61 258,057.79 258,057.79 257,716.96 257,716.96 257,348.84 257,348.84 257,293.13 257,293.13 257,595.17 257,595.17 257,969.80 257,969.80
8 Bahan Agr. Base Kelas S M3 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
9 Bahan Pilihan M3 208,000 208,000 208,562.78 208,562.78 208,850.30 208,850.30 208,856.11 208,856.11 208,580.27 208,580.27 208,282.33 208,282.33 208,237.24 208,237.24 208,481.69 208,481.69 208,784.90 208,784.90
10 Bahan Tanah Timbunan M3 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
11 Batu Belah/Kerakal M3 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
12 Batu Kali M3 346,000 346,000 346,936.16 346,936.16 347,414.44 347,414.44 347,424.11 347,424.11 346,965.25 346,965.25 346,469.64 346,469.64 346,394.64 346,394.64 346,801.28 346,801.28 347,305.65 347,305.65
13 Chipping M3 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
14 Chipping (kg) Kg 248 248 248.67 248.67 249.01 249.01 249.02 249.02 248.69 248.69 248.34 248.34 248.28 248.28 248.57 248.57 248.94 248.94
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
18 Kapur M3 98,935 98,935 99,202.68 99,202.68 99,339.44 99,339.44 99,342.21 99,342.21 99,211.00 99,211.00 99,069.29 99,069.29 99,047.84 99,047.84 99,164.12 99,164.12 99,308.34 99,308.34
19 Pasir Beton (Kasar) M3 470,000 470,000 471,271.66 471,271.66 471,921.35 471,921.35 471,934.48 471,934.48 471,311.18 471,311.18 470,637.95 470,637.95 470,536.07 470,536.07 471,088.44 471,088.44 471,773.57 471,773.57
20 Pasir Halus (untuk HRS) M3 420,000 420,000 421,136.37 421,136.37 421,716.95 421,716.95 421,728.69 421,728.69 421,171.69 421,171.69 420,570.08 420,570.08 420,479.04 420,479.04 420,972.65 420,972.65 421,584.89 421,584.89
21 Pasir Pasang (Sedang) M3 400,000 400,000 401,082.26 401,082.26 401,635.19 401,635.19 401,646.37 401,646.37 401,115.90 401,115.90 400,542.94 400,542.94 400,456.23 400,456.23 400,926.34 400,926.34 401,509.42 401,509.42
22 Pasir Urug M3 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
23 Pasir Urug (ada unsur lempung) M3 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
24 Sirtu M3 158,617 158,617 159,046.16 159,046.16 159,265.42 159,265.42 159,269.86 159,269.86 159,059.50 159,059.50 158,832.30 158,832.30 158,797.91 158,797.91 158,984.33 158,984.33 159,215.55 159,215.55
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 69,000 69,000 69,186.69 69,186.69 69,282.07 69,282.07 69,284.00 69,284.00 69,192.49 69,192.49 69,093.66 69,093.66 69,078.70 69,078.70 69,159.79 69,159.79 69,260.37 69,260.37
26 Anti Pengelupas Liter 99,925 99,925 100,195.36 100,195.36 100,333.49 100,333.49 100,336.28 100,336.28 100,203.76 100,203.76 100,060.63 100,060.63 100,038.97 100,038.97 100,156.41 100,156.41 100,302.07 100,302.07
27 Arbocell Kg 167,000 167,000 167,451.84 167,451.84 167,682.69 167,682.69 167,687.36 167,687.36 167,465.89 167,465.89 167,226.68 167,226.68 167,190.48 167,190.48 167,386.75 167,386.75 167,630.18 167,630.18
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
40 Beton B-0 M3 583,719 583,719 585,298.25 585,298.25 586,105.13 586,105.13 586,121.45 586,121.45 585,347.33 585,347.33 584,511.21 584,511.21 584,384.68 584,384.68 585,070.71 585,070.71 585,921.60 585,921.60
41 Beton K-125 (fc' 10 MPa) M3 603,506 603,506 605,138.87 605,138.87 605,973.10 605,973.10 605,989.97 605,989.97 605,189.61 605,189.61 604,325.15 604,325.15 604,194.33 604,194.33 604,903.61 604,903.61 605,783.35 605,783.35
42 Beton K-175 (fc' 15 MPa) M3 652,974 652,974 654,740.41 654,740.41 655,643.03 655,643.03 655,661.28 655,661.28 654,795.32 654,795.32 653,860.00 653,860.00 653,718.46 653,718.46 654,485.87 654,485.87 655,437.72 655,437.72
43 Beton K-250 (fc' 20 MPa) M3 727,175 727,175 729,142.73 729,142.73 730,147.92 730,147.92 730,168.25 730,168.25 729,203.88 729,203.88 728,162.27 728,162.27 728,004.64 728,004.64 728,859.27 728,859.27 729,919.28 729,919.28
44 Beton K-300 (fc' 25 MPa) M3 789,000 764,000 791,134.76 766,067.12 792,225.41 767,123.21 792,247.46 767,144.57 791,201.10 766,131.36 790,070.94 765,037.01 789,899.91 764,871.40 790,827.20 765,769.30 791,977.33 766,882.99
45 Beton K-350 (fc' 30 MPa) M3 786,536 789,000 788,664.59 791,134.76 789,751.83 792,225.41 789,773.82 792,247.46 788,730.72 791,201.10 787,604.09 790,070.94 787,433.59 789,899.91 788,357.99 790,827.20 789,504.53 791,977.33
46 Beton K-400 (fc' 35 MPa) M3 816,217 816,217 818,425.52 818,425.52 819,553.79 819,553.79 819,576.60 819,576.60 818,494.15 818,494.15 817,325.00 817,325.00 817,148.07 817,148.07 818,107.34 818,107.34 819,297.15 819,297.15
47 Beton K-450 (fc' 40 MPa) M3 855,791 855,791 858,106.75 858,106.75 859,289.73 859,289.73 859,313.65 859,313.65 858,178.71 858,178.71 856,952.88 856,952.88 856,767.37 856,767.37 857,773.15 857,773.15 859,020.65 859,020.65
48 Beton K-500 (fc' 45 MPa) M3 890,419 890,419 892,827.84 892,827.84 894,058.68 894,058.68 894,083.57 894,083.57 892,902.71 892,902.71 891,627.27 891,627.27 891,434.26 891,434.26 892,480.74 892,480.74 893,778.71 893,778.71
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
51 Cat Anti Karat Kg 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
52 Cat Marka (Non Thermoplas) Kg 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
53 Cat Marka (Thermoplastic) Kg 48,840 48,840 48,972.14 48,972.14 49,039.66 49,039.66 49,041.02 49,041.02 48,976.25 48,976.25 48,906.29 48,906.29 48,895.71 48,895.71 48,953.11 48,953.11 49,024.30 49,024.30
54 Cerucuk Diameter 10-15 cm M' 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,291,000 1,291,000 1,294,493.00 1,294,493.00 1,296,277.57 1,296,277.57 1,296,313.66 1,296,313.66 1,294,601.55 1,294,601.55 1,292,752.33 1,292,752.33 1,292,472.48 1,292,472.48 1,293,989.75 1,293,989.75 1,295,871.65 1,295,871.65
57 Curing Compound Liter 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 604,000 604,000 605,634.21 605,634.21 606,469.13 606,469.13 606,486.02 606,486.02 605,685.00 605,685.00 604,819.83 604,819.83 604,688.91 604,688.91 605,398.77 605,398.77 606,279.22 606,279.22
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 702,000 702,000 703,899.37 703,899.37 704,869.76 704,869.76 704,889.38 704,889.38 703,958.40 703,958.40 702,952.85 702,952.85 702,800.68 702,800.68 703,625.72 703,625.72 704,649.03 704,649.03
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 890,000 890,000 892,408.03 892,408.03 893,638.29 893,638.29 893,663.17 893,663.17 892,482.87 892,482.87 891,208.03 891,208.03 891,015.11 891,015.11 892,061.10 892,061.10 893,358.46 893,358.46
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 49,500 49,500 49,633.93 49,633.93 49,702.35 49,702.35 49,703.74 49,703.74 49,638.09 49,638.09 49,567.19 49,567.19 49,556.46 49,556.46 49,614.63 49,614.63 49,686.79 49,686.79
64 Oxygen (Isi 6 M3) Botol 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,365,000 1,365,000 1,368,693.22 1,368,693.22 1,370,580.08 1,370,580.08 1,370,618.23 1,370,618.23 1,368,807.99 1,368,807.99 1,366,852.77 1,366,852.77 1,366,556.88 1,366,556.88 1,368,161.12 1,368,161.12 1,370,150.89 1,370,150.89
67 Seal Coat M2 109,000 109,000 109,294.92 109,294.92 109,445.59 109,445.59 109,448.64 109,448.64 109,304.08 109,304.08 109,147.95 109,147.95 109,124.32 109,124.32 109,252.43 109,252.43 109,411.32 109,411.32
68 Seal Guard Kg 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
69 Semen/PC (50 kg) Zak 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
77 Baja Tulangan (Polos) U25 Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
78 Baja Tulangan (Polos) U32 Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
79 Baja Tulangan (Polos) U36 Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
80 Baja Tulangan (Ulir) D16 Kg 13,214 13,214 13,249.75 13,249.75 13,268.02 13,268.02 13,268.39 13,268.39 13,250.86 13,250.86 13,231.94 13,231.94 13,229.07 13,229.07 13,244.60 13,244.60 13,263.86 13,263.86
81 Baja Tulangan (Ulir) D19 Kg 13,214 13,214 13,249.75 13,249.75 13,268.02 13,268.02 13,268.39 13,268.39 13,250.86 13,250.86 13,231.94 13,231.94 13,229.07 13,229.07 13,244.60 13,244.60 13,263.86 13,263.86
82 Baja Tulangan (Ulir) D24 Kg 13,214 13,214 13,249.75 13,249.75 13,268.02 13,268.02 13,268.39 13,268.39 13,250.86 13,250.86 13,231.94 13,231.94 13,229.07 13,229.07 13,244.60 13,244.60 13,263.86 13,263.86
83 Baja Tulangan (Ulir) D32 Kg 13,214 13,214 13,249.75 13,249.75 13,268.02 13,268.02 13,268.39 13,268.39 13,250.86 13,250.86 13,231.94 13,231.94 13,229.07 13,229.07 13,244.60 13,244.60 13,263.86 13,263.86
84 Baja Tulangan (Ulir) D36 Kg 13,214 13,214 13,249.75 13,249.75 13,268.02 13,268.02 13,268.39 13,268.39 13,250.86 13,250.86 13,231.94 13,231.94 13,229.07 13,229.07 13,244.60 13,244.60 13,263.86 13,263.86
85 Besi Beton Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,654,000 12,654,000 12,688,237.34 12,688,237.34 12,705,729.19 12,705,729.19 12,706,082.89 12,706,082.89 12,689,301.35 12,689,301.35 12,671,175.79 12,671,175.79 12,668,432.80 12,668,432.80 12,683,304.63 12,683,304.63 12,701,750.47 12,701,750.47
87 Box Culvert Type DUB 200×200 M' 13,653,086 13,653,086 13,690,026.81 13,690,026.81 13,708,899.72 13,708,899.72 13,709,281.35 13,709,281.35 13,691,174.84 13,691,174.84 13,671,618.18 13,671,618.18 13,668,658.63 13,668,658.63 13,684,704.65 13,684,704.65 13,704,606.86 13,704,606.86
88 Box Culvert Type uk 300×200 M' 14,741,376 14,741,376 14,781,260.83 14,781,260.83 14,801,638.11 14,801,638.11 14,802,050.15 14,802,050.15 14,782,500.37 14,782,500.37 14,761,384.85 14,761,384.85 14,758,189.39 14,758,189.39 14,775,514.44 14,775,514.44 14,797,003.06 14,797,003.06
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 192,000 192,000 192,519.49 192,519.49 192,784.89 192,784.89 192,790.26 192,790.26 192,535.63 192,535.63 192,260.61 192,260.61 192,218.99 192,218.99 192,444.64 192,444.64 192,724.52 192,724.52
91 Ducting (Strand Prestress) M' 167,000 167,000 167,451.84 167,451.84 167,682.69 167,682.69 167,687.36 167,687.36 167,465.89 167,465.89 167,226.68 167,226.68 167,190.48 167,190.48 167,386.75 167,386.75 167,630.18 167,630.18
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,153,000 2,153,000 2,158,825.27 2,158,825.27 2,161,801.40 2,161,801.40 2,161,861.58 2,161,861.58 2,159,006.31 2,159,006.31 2,155,922.35 2,155,922.35 2,155,455.65 2,155,455.65 2,157,986.00 2,157,986.00 2,161,124.45 2,161,124.45
94 Expansion Join Tipe Rubber M' 1,559,000 1,559,000 1,563,218.11 1,563,218.11 1,565,373.15 1,565,373.15 1,565,416.72 1,565,416.72 1,563,349.20 1,563,349.20 1,561,116.09 1,561,116.09 1,560,778.15 1,560,778.15 1,562,610.39 1,562,610.39 1,564,882.96 1,564,882.96
95 Expansion Join Tipe Torma M' 1,788,000 1,788,000 1,792,837.71 1,792,837.71 1,795,309.29 1,795,309.29 1,795,359.27 1,795,359.27 1,792,988.05 1,792,988.05 1,790,426.93 1,790,426.93 1,790,039.34 1,790,039.34 1,792,140.72 1,792,140.72 1,794,747.10 1,794,747.10
96 Expansion Tipe Joint Asphaltic Plug M' 2,121,000 2,121,000 2,126,738.69 2,126,738.69 2,129,670.59 2,129,670.59 2,129,729.87 2,129,729.87 2,126,917.04 2,126,917.04 2,123,878.92 2,123,878.92 2,123,419.15 2,123,419.15 2,125,911.90 2,125,911.90 2,129,003.69 2,129,003.69
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
99 Glass Bead Kg 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
100 Joint Sealent Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
101 Joint Socket Pile 16×16×16 Set 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
102 Joint Socket Pile 35×35 Set 774,000 774,000 776,094.18 776,094.18 777,164.09 777,164.09 777,185.72 777,185.72 776,159.26 776,159.26 775,050.58 775,050.58 774,882.80 774,882.80 775,792.46 775,792.46 776,920.73 776,920.73
103 Kawat Beton Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
104 Kawat Bronjong Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
105 Kawat Las Dos 109,000 109,000 109,294.92 109,294.92 109,445.59 109,445.59 109,448.64 109,448.64 109,304.08 109,304.08 109,147.95 109,147.95 109,124.32 109,124.32 109,252.43 109,252.43 109,411.32 109,411.32
106 Kayu Acuan (Kelas III/Meranti) M3 4,254,000 4,254,000 4,265,509.85 4,265,509.85 4,271,390.23 4,271,390.23 4,271,509.14 4,271,509.14 4,265,867.55 4,265,867.55 4,259,774.13 4,259,774.13 4,258,852.00 4,258,852.00 4,263,851.58 4,263,851.58 4,270,052.67 4,270,052.67
107 Kayu Perancah (Gelam) M3 2,947,490 2,947,490 2,955,464.89 2,955,464.89 2,959,539.26 2,959,539.26 2,959,621.64 2,959,621.64 2,955,712.73 2,955,712.73 2,951,490.75 2,951,490.75 2,950,851.83 2,950,851.83 2,954,315.91 2,954,315.91 2,958,612.49 2,958,612.49
108 Kerb Pracetak Type 1 (Peninggi) Buah 54,000 54,000 54,146.11 54,146.11 54,220.75 54,220.75 54,222.26 54,222.26 54,150.65 54,150.65 54,073.30 54,073.30 54,061.59 54,061.59 54,125.06 54,125.06 54,203.77 54,203.77
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
110 Marmer Nama Jembatan Buah 594,000 594,000 595,607.16 595,607.16 596,428.26 596,428.26 596,444.86 596,444.86 595,657.10 595,657.10 594,806.26 594,806.26 594,677.50 594,677.50 595,375.61 595,375.61 596,241.49 596,241.49
111 Mata Kucing Buah 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93 156,361.27 156,361.27 156,588.67 156,588.67
112 Matras Concrete (Tebal=10 cm) M2 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
113 Mini Pile 16×16×16 M' 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
114 Mini Timber Pile Buah 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
115 Multipleks 12 mm Lbr 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
116 Paku Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
117 Paving Block (Model Bata 8 cm) M2 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 65,771,000 65,771,000 65,948,953.52 65,948,953.52 66,039,869.99 66,039,869.99 66,041,708.38 66,041,708.38 65,954,483.91 65,954,483.91 65,860,273.66 65,860,273.66 65,846,016.59 65,846,016.59 65,923,315.08 65,923,315.08 66,019,189.97 66,019,189.97
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 93,175,000 93,175,000 93,427,099.25 93,427,099.25 93,555,896.77 93,555,896.77 93,558,501.13 93,558,501.13 93,434,933.91 93,434,933.91 93,301,470.22 93,301,470.22 93,281,272.84 93,281,272.84 93,390,778.34 93,390,778.34 93,526,600.26 93,526,600.26
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 178,084,000 178,084,000 178,565,833.56 178,565,833.56 178,812,002.36 178,812,002.36 178,816,980.04 178,816,980.04 178,580,807.83 178,580,807.83 178,325,720.66 178,325,720.66 178,287,117.70 178,287,117.70 178,496,413.95 178,496,413.95 178,756,008.38 178,756,008.38
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 233,529,000 233,529,000 234,160,848.51 234,160,848.51 234,483,659.96 234,483,659.96 234,490,187.40 234,490,187.40 234,180,484.90 234,180,484.90 233,845,978.42 233,845,978.42 233,795,356.74 233,795,356.74 234,069,815.67 234,069,815.67 234,410,232.70 234,410,232.70
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 297,687,000 297,687,000 298,492,437.81 298,492,437.81 298,903,936.05 298,903,936.05 298,912,256.79 298,912,256.79 298,517,468.95 298,517,468.95 298,091,062.69 298,091,062.69 298,026,533.59 298,026,533.59 298,376,395.29 298,376,395.29 298,810,335.94 298,810,335.94
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 359,159,000 359,159,000 360,130,759.73 360,130,759.73 360,627,231.85 360,627,231.85 360,637,270.81 360,637,270.81 360,160,959.77 360,160,959.77 359,646,501.13 359,646,501.13 359,568,646.85 359,568,646.85 359,990,754.58 359,990,754.58 360,514,303.43 360,514,303.43
124 Pelat Rambu (Eng. Grade) Buah 192,000 192,000 192,519.49 192,519.49 192,784.89 192,784.89 192,790.26 192,790.26 192,535.63 192,535.63 192,260.61 192,260.61 192,218.99 192,218.99 192,444.64 192,444.64 192,724.52 192,724.52
125 Pelat Rambu (High L Grade) Buah 333,000 333,000 333,900.98 333,900.98 334,361.29 334,361.29 334,370.60 334,370.60 333,928.98 333,928.98 333,451.99 333,451.99 333,379.81 333,379.81 333,771.17 333,771.17 334,256.59 334,256.59
126 Pemantul Cahaya (Reflector) Buah 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
127 Pipa Baja D10" Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
128 Pipa Drainase Baja Dia 3" M' 272,000 272,000 272,735.94 272,735.94 273,111.93 273,111.93 273,119.53 273,119.53 272,758.81 272,758.81 272,369.20 272,369.20 272,310.24 272,310.24 272,629.91 272,629.91 273,026.40 273,026.40
129 Pipa Galvanis Dia 1,5" M' 108,000 108,000 108,292.21 108,292.21 108,441.50 108,441.50 108,444.52 108,444.52 108,301.29 108,301.29 108,146.59 108,146.59 108,123.18 108,123.18 108,250.11 108,250.11 108,407.54 108,407.54
130 Pipa Galvanis Dia 2" M' 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
131 Pipa Galvanis Dia 3" M' 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
132 Pipa Porus M' 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
133 Pipa PVC Dia 4" M' 215,000 215,000 215,581.72 215,581.72 215,878.91 215,878.91 215,884.92 215,884.92 215,599.79 215,599.79 215,291.83 215,291.83 215,245.22 215,245.22 215,497.91 215,497.91 215,811.31 215,811.31
134 Plastik Filter M2 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
135 Rel Pengaman M' 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,032,000 2,032,000 2,037,497.89 2,037,497.89 2,040,306.76 2,040,306.76 2,040,363.56 2,040,363.56 2,037,668.75 2,037,668.75 2,034,758.12 2,034,758.12 2,034,317.64 2,034,317.64 2,036,705.79 2,036,705.79 2,039,667.85 2,039,667.85
137 Strip Bearing Buah 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
138 Tiang Pancang Baja Diameter 400 M' 720,000 720,000 721,948.07 721,948.07 722,943.34 722,943.34 722,963.46 722,963.46 722,008.61 722,008.61 720,977.29 720,977.29 720,821.21 720,821.21 721,667.40 721,667.40 722,716.95 722,716.95
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 880,000 880,000 882,380.97 882,380.97 883,597.42 883,597.42 883,622.01 883,622.01 882,454.97 882,454.97 881,194.46 881,194.46 881,003.70 881,003.70 882,037.94 882,037.94 883,320.72 883,320.72
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,840,000 1,840,000 1,844,978.40 1,844,978.40 1,847,521.87 1,847,521.87 1,847,573.30 1,847,573.30 1,845,133.12 1,845,133.12 1,842,497.51 1,842,497.51 1,842,098.65 1,842,098.65 1,844,261.14 1,844,261.14 1,846,943.33 1,846,943.33
HARGA SATUAN DASAR UPAH KOTA KEDIRI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 119,307.99
2 Tukang OH 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 134,346.82
3 Mandor OH 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 153,395.99
4 Operator OH 318,320.35 318,320.35 317,998.64 317,998.64 317,536.05 317,536.05 317,361.52 317,361.52 317,630.33 317,630.33 318,086.30 318,086.30 318,305.70 318,305.70 317,820.45 317,820.45
5 Pembantu Operator OH 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 198,512.46
6 Sopir OH 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 148,383.05
7 Pembantu Sopir OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
8 Mekanik OH 178,741.40 178,741.40 178,560.75 178,560.75 178,301.00 178,301.00 178,203.00 178,203.00 178,353.94 178,353.94 178,609.97 178,609.97 178,733.17 178,733.17 178,460.70 178,460.70
9 Pembantu Mekanik OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
10 Kepala Tukang OH 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 148,383.05
11 Pemasak Aspal OH 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 148,383.05

HARGA SATUAN DASAR ALAT KOTA KEDIRI TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 467,926.67 522,165.88 467,453.76 521,638.15 466,773.76 520,879.33 466,517.21 520,593.04 466,912.35 521,033.99 467,582.61 521,781.94 467,905.13 522,141.84 467,191.82 949,597.20
2 Asphalt Distribution Unit/Jam 288,107.72 370,536.94 287,816.54 370,162.45 287,397.86 369,623.99 287,239.89 369,420.83 287,483.19 369,733.73 287,895.88 370,264.49 288,094.46 370,519.88 287,655.26 633,634.21
3 Asphalt Finisher Unit/Jam 211,610.15 1,003,160.99 211,396.29 1,002,147.13 211,088.77 1,000,689.33 210,972.75 1,000,139.32 211,151.45 1,000,986.45 211,454.56 1,002,423.38 211,600.41 1,003,114.81 211,277.83 1,195,253.39
4 Asphalt Liquid Mixer Unit/Jam 75,504.09 138,574.79 75,427.78 138,434.74 75,318.06 138,233.36 75,276.66 138,157.38 75,340.42 138,274.40 75,448.57 138,472.90 75,500.62 138,568.41 75,385.52 207,459.30
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 101,334.44 101,334.44 101,232.02 101,232.02 101,084.76 101,084.76 101,029.20 101,029.20 101,114.78 101,114.78 101,259.93 101,259.93 101,329.77 101,329.77 101,175.30 193,917.63
6 Asphalt Mixing Plant Unit/Jam 1,132,561.37 5,886,261.47 1,131,416.74 5,880,312.48 1,129,770.90 5,871,758.53 1,129,149.93 5,868,531.18 1,130,106.33 5,873,501.90 1,131,728.62 5,881,933.39 1,132,509.24 5,885,990.51 1,130,782.76 6,913,549.41
7 Asphalt Sprayer Unit/Jam 93,386.64 93,386.64 93,292.26 93,292.26 93,156.55 93,156.55 93,105.35 93,105.35 93,184.21 93,184.21 93,317.97 93,317.97 93,382.34 93,382.34 93,239.98 178,708.40
8 Asphalt Tanker Unit/Jam 437,128.95 507,103.40 436,687.16 506,590.89 436,051.92 505,853.97 435,812.25 505,575.93 436,181.39 506,004.16 436,807.54 506,730.54 437,108.83 507,080.06 436,442.47 906,371.98
9 Blending Equipment Unit/Jam 142,066.91 224,932.99 141,923.33 224,705.66 141,716.88 224,378.79 141,638.98 224,255.46 141,758.95 224,445.41 141,962.45 224,767.60 142,060.37 224,922.64 141,843.80 354,600.86
10 Bore Pile Machine Unit/Jam 391,429.11 680,823.97 391,033.50 680,135.89 390,464.68 679,146.51 390,250.06 678,773.23 390,580.61 679,348.16 391,141.29 680,323.37 391,411.09 680,792.63 390,814.39 1,037,994.76
11 Bore Pile Machine Dia 60 Unit/Jam 256,316.52 775,215.50 256,057.47 774,432.02 255,684.99 773,305.47 255,544.46 772,880.43 255,760.91 773,535.07 256,128.06 774,645.49 256,304.72 775,179.81 255,913.99 1,008,581.61
12 Bore Pile Machine Dia 80 Unit/Jam 1,013,344.39 1,013,344.39 1,012,320.24 1,012,320.24 1,010,847.64 1,010,847.64 1,010,292.04 1,010,292.04 1,011,147.77 1,011,147.77 1,012,599.29 1,012,599.29 1,013,297.74 1,013,297.74 1,011,753.00 1,939,176.29
13 Bulldozer 100-150 HP Unit/Jam 397,389.96 576,390.80 396,988.33 575,808.26 396,410.84 574,970.65 396,192.96 574,654.62 396,528.54 575,141.36 397,097.76 575,966.98 397,371.66 576,364.26 396,765.88 939,181.02
14 Cement Tanker Unit/Jam 369,572.66 476,978.45 369,199.15 476,496.38 368,662.08 475,803.24 368,459.45 475,541.72 368,771.54 475,944.51 369,300.92 476,627.73 369,555.65 476,956.49 368,992.27 814,466.12
15 Cold Milling Unit/Jam 577,208.91 1,404,294.84 576,625.55 1,402,875.58 575,786.75 1,400,834.85 575,470.27 1,400,064.89 575,957.70 1,401,250.77 576,784.50 1,403,262.28 577,182.34 1,404,230.20 576,302.44 1,930,357.07
16 Cold Recycler Unit/Jam 4,861,072.63 4,861,163.50 4,856,159.75 4,856,250.52 4,849,095.61 4,849,186.25 4,846,430.35 4,846,520.95 4,850,535.34 4,850,626.01 4,857,498.35 4,857,589.15 4,860,848.86 4,860,939.72 4,853,438.64 9,302,433.47
17 Compressor 4000-6500 L\M Unit/Jam 148,027.76 160,609.19 147,878.15 160,446.87 147,663.04 160,213.47 147,581.88 160,125.41 147,706.88 160,261.04 147,918.92 160,491.09 148,020.94 160,601.79 147,795.29 295,833.50
18 Concrete Breaker Unit/Jam 539,456.86 1,028,265.11 538,911.66 1,027,225.89 538,127.72 1,025,731.61 537,831.94 1,025,167.83 538,287.49 1,026,036.16 539,060.21 1,027,509.05 539,432.03 1,028,217.78 538,609.68 1,520,366.81
19 Concrete Mixer (350) Unit/Jam 100,340.96 100,340.96 100,239.55 100,239.55 100,093.74 100,093.74 100,038.72 100,038.72 100,123.46 100,123.46 100,267.18 100,267.18 100,336.34 100,336.34 100,183.38 192,016.48
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 114,249.61 114,249.61 114,134.14 114,134.14 113,968.12 113,968.12 113,905.48 113,905.48 114,001.95 114,001.95 114,165.61 114,165.61 114,244.35 114,244.35 114,070.19 218,632.62
21 Concrete Pan Mixer Unit/Jam 304,003.32 650,699.02 303,696.07 650,041.38 303,254.29 649,095.78 303,087.61 648,739.02 303,344.33 649,288.51 303,779.79 650,220.57 303,989.32 650,669.06 303,525.90 927,904.13
22 Concrete Pump Unit/Jam 231,479.65 248,771.87 231,245.70 248,520.45 230,909.31 248,158.93 230,782.40 248,022.54 230,977.87 248,232.61 231,309.45 248,588.96 231,468.99 248,760.42 231,116.13 460,233.77
23 Concrete Vibrator Unit/Jam 86,432.32 86,432.32 86,344.96 86,344.96 86,219.36 86,219.36 86,171.97 86,171.97 86,244.96 86,244.96 86,368.76 86,368.76 86,428.34 86,428.34 86,296.58 165,400.33
24 Crane 10-15 Ton Unit/Jam 309,964.17 388,767.56 309,650.90 388,374.65 309,200.46 387,809.69 309,030.51 387,596.53 309,292.26 387,924.83 309,736.25 388,481.70 309,949.90 388,749.66 309,477.39 671,839.45
25 Crane On Track 35 Ton Unit/Jam 257,310.00 489,028.43 257,049.94 488,534.19 256,676.02 487,823.53 256,534.94 487,555.40 256,752.23 487,968.37 257,120.80 488,668.85 257,298.15 489,005.92 256,905.91 723,753.22
26 Crane On Track 75-100 Ton Unit/Jam 404,344.28 612,540.74 403,935.63 611,921.67 403,348.03 611,031.53 403,126.33 610,695.68 403,467.79 611,212.95 404,046.97 612,090.35 404,325.67 612,512.55 403,709.28 981,638.87
27 Dump Truck 10 Ton Unit/Jam 382,487.83 411,707.71 382,101.27 411,291.62 381,545.43 410,693.32 381,335.72 410,467.59 381,658.72 410,815.26 382,206.59 411,404.99 382,470.23 411,688.76 381,887.16 761,117.98
28 Dump Truck 3-4 M3 Unit/Jam 208,629.73 264,441.87 208,418.87 264,174.61 208,115.69 263,790.32 208,001.30 263,645.33 208,177.48 263,868.64 208,476.32 264,247.43 208,620.12 264,429.70 208,302.09 454,966.67
29 Excavator 80-140 HP Unit/Jam 302,016.37 458,763.89 301,711.13 458,300.24 301,272.24 457,633.56 301,106.65 457,382.03 301,361.69 457,769.44 301,794.30 458,426.57 302,002.46 458,742.78 301,542.07 734,451.95
30 Flat Bed Truck 3-4 M3 Unit/Jam 366,592.23 490,032.59 366,221.73 489,537.34 365,689.00 488,825.22 365,488.00 488,556.54 365,797.58 488,970.36 366,322.68 489,672.28 366,575.36 490,010.04 366,016.53 824,772.05
31 Fulvi Mixer Unit/Jam 917,970.80 1,433,947.84 917,043.04 1,432,498.60 915,709.04 1,430,414.78 915,205.73 1,429,628.57 915,980.92 1,430,839.48 917,295.83 1,432,893.47 917,928.54 1,433,881.83 916,529.18 2,271,832.31
32 Generator Set Unit/Jam 408,318.18 551,494.53 407,905.51 550,937.16 407,312.14 550,135.72 407,088.26 549,833.35 407,433.07 550,299.06 408,017.95 551,089.02 408,299.38 551,469.14 407,676.94 924,325.48
33 Hot Recycler Unit/Jam 2,999,300.69 8,795,482.56 2,996,269.42 8,786,593.33 2,991,910.82 8,773,811.69 2,990,266.35 8,768,989.26 2,992,799.14 8,776,416.70 2,997,095.35 8,789,015.36 2,999,162.62 8,795,077.68 2,994,590.49 11,526,660.95
34 Jack Hammer Unit/Jam 56,628.07 56,628.07 56,570.84 56,570.84 56,488.54 56,488.54 56,457.50 56,457.50 56,505.32 56,505.32 56,586.43 56,586.43 56,625.46 56,625.46 56,539.14 108,365.73
35 Launching Gantry Unit/Jam 72,065,674.91 72,065,674.91 71,992,841.16 71,992,841.16 71,888,114.91 71,888,114.91 71,848,602.40 71,848,602.40 71,909,459.05 71,909,459.05 72,012,686.07 72,012,686.07 72,062,357.56 72,062,357.56 71,952,500.58 137,907,753.99
36 Motor Grader > 100 HP Unit/Jam 283,140.34 532,128.20 282,854.19 531,590.40 282,442.72 530,817.11 282,287.48 530,525.35 282,526.58 530,974.71 282,932.15 531,736.93 283,127.31 532,103.71 282,695.69 790,425.51
37 Pedestrian Roller Unit/Jam 93,386.64 93,386.64 93,292.26 93,292.26 93,156.55 93,156.55 93,105.35 93,105.35 93,184.21 93,184.21 93,317.97 93,317.97 93,382.34 93,382.34 93,239.98 178,708.40
38 Pile Driver + Hammer Unit/Jam 106,301.81 311,291.20 106,194.38 310,976.59 106,039.90 310,524.22 105,981.62 310,353.54 106,071.38 310,616.41 106,223.65 311,062.31 106,296.92 311,276.87 106,134.87 408,090.86
39 Rock Drill Breaker Unit/Jam 103,321.39 335,391.16 103,216.97 335,052.19 103,066.82 334,564.80 103,010.17 334,380.91 103,097.42 334,664.14 103,245.42 335,144.55 103,316.63 335,375.72 103,159.13 429,425.26
40 Split Form Paver Unit/Jam 218,564.48 218,564.58 218,343.58 218,343.68 218,025.96 218,026.07 217,906.13 217,906.23 218,090.70 218,090.80 218,403.77 218,403.87 218,554.41 218,554.52 218,221.23 418,253.81
41 Stone Crusher Unit/Jam 585,156.71 855,548.71 584,565.32 854,684.04 583,714.96 853,440.75 583,394.13 852,971.67 583,888.27 853,694.15 584,726.45 854,919.64 585,129.77 855,509.33 584,237.76 1,389,746.62
42 Tamper Unit/Jam 87,425.79 87,425.79 87,337.43 87,337.43 87,210.38 87,210.38 87,162.45 87,162.45 87,236.28 87,236.28 87,361.51 87,361.51 87,421.77 87,421.77 87,288.49 167,301.48
43 Tandem Roller 6-8 T Unit/Jam 422,226.83 493,045.09 421,800.10 492,546.79 421,186.52 491,830.29 420,955.02 491,559.96 421,311.57 491,976.32 421,916.37 492,682.56 422,207.39 493,022.39 421,563.75 878,697.17
44 Three Wheel Roller 6-8 T Unit/Jam 140,079.96 193,148.15 139,938.39 192,952.95 139,734.82 192,672.26 139,658.02 192,566.36 139,776.31 192,729.47 139,976.96 193,006.14 140,073.51 193,139.26 139,859.97 321,047.46
45 Tire Roller 8-10 T Unit/Jam 250,355.67 451,874.32 250,102.65 451,417.63 249,738.83 450,760.96 249,601.56 450,513.21 249,812.98 450,894.80 250,171.59 451,542.06 250,344.15 451,853.52 249,962.50 680,292.79
46 Track Loader 75-100 HP Unit/Jam 234,460.07 425,003.86 234,223.11 424,574.33 233,882.40 423,956.71 233,753.85 423,723.69 233,951.84 424,082.59 234,287.68 424,691.36 234,449.28 424,984.30 234,091.87 638,916.71
47 Trailer 20 Ton Unit/Jam 378,513.93 523,561.67 378,131.38 523,032.53 377,581.33 522,271.68 377,373.79 521,984.62 377,693.43 522,426.75 378,235.62 523,176.70 378,496.51 523,537.57 377,919.50 869,159.33
48 Trailler 15 Ton Unit/Jam 327,846.71 537,228.36 327,515.37 536,685.40 327,038.94 535,904.70 326,859.19 535,610.14 327,136.04 536,063.81 327,605.65 536,833.34 327,831.62 537,203.63 327,331.85 836,433.39
49 Truck Mixer (agitator) Unit/Jam 412,292.08 674,798.98 411,875.39 674,116.99 411,276.25 673,136.37 411,050.19 672,766.39 411,398.36 673,336.23 411,988.93 674,302.81 412,273.10 674,767.92 411,644.60 1,051,073.24
50 Vibrating Rammer Unit/Jam 84,445.37 84,445.37 84,360.02 84,360.02 84,237.30 84,237.30 84,191.00 84,191.00 84,262.31 84,262.31 84,383.27 84,383.27 84,441.48 84,441.48 84,312.75 161,598.02
51 Vibratory Roller 5-8 T Unit/Jam 203,662.35 436,811.84 203,456.52 436,370.37 203,160.56 435,735.60 203,048.89 435,496.10 203,220.88 435,864.97 203,512.60 436,490.66 203,652.98 436,791.73 203,342.51 622,519.75
52 Water Pump 70-100 MM Unit/Jam 63,582.39 63,582.39 63,518.13 63,518.13 63,425.73 63,425.73 63,390.87 63,390.87 63,444.57 63,444.57 63,535.64 63,535.64 63,579.47 63,579.47 63,482.54 121,673.81
53 Water Tanker 3000-4500 L Unit/Jam 230,486.17 230,900.75 230,253.23 230,667.39 229,918.29 230,331.84 229,791.92 230,205.24 229,986.55 230,400.23 230,316.70 230,730.97 230,475.56 230,890.12 230,124.21 441,481.47
54 Welding Set Unit/Jam 129,151.74 129,151.74 129,021.21 129,021.21 128,833.52 128,833.52 128,762.71 128,762.71 128,871.77 128,871.77 129,056.77 129,056.77 129,145.79 129,145.79 128,948.91 247,149.92
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 224,525.32 436,909.24 224,298.41 436,467.68 223,972.12 435,832.76 223,849.02 435,593.21 224,038.62 435,962.16 224,360.23 436,587.99 224,514.99 436,889.13 224,172.72 641,711.01
HARGA SATUAN DASAR BAHAN KOTA KEDIRI TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 599,542.49
2 Agregat Pecah Mesin 20-30 mm M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 599,542.49
4 Bahan Agr. Base Kelas A M3 327,357.84 327,357.84 327,026.99 327,026.99 326,551.27 326,551.27 326,371.79 326,371.79 326,648.23 326,648.23 327,117.14 327,117.14 327,342.77 327,342.77 326,843.75 626,445.04
5 Bahan Agr. Base Kelas B M3 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
6 Bahan Agr. Base Kelas C M3 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
7 Bahan Agr. Base Kelas C2 M3 258,070.44 258,070.44 257,809.62 257,809.62 257,434.59 257,434.59 257,293.10 257,293.10 257,511.03 257,511.03 257,880.69 257,880.69 258,058.56 258,058.56 257,665.16 493,853.91
8 Bahan Agr. Base Kelas S M3 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
9 Bahan Pilihan M3 208,866.35 208,866.35 208,655.26 208,655.26 208,351.73 208,351.73 208,237.21 208,237.21 208,413.59 208,413.59 208,712.77 208,712.77 208,856.74 208,856.74 208,538.34 399,694.99
10 Bahan Tanah Timbunan M3 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 228,671.65
11 Batu Belah/Kerakal M3 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 343,968.29
12 Batu Kali M3 347,441.14 347,441.14 347,090.00 347,090.00 346,585.09 346,585.09 346,394.60 346,394.60 346,688.00 346,688.00 347,185.67 347,185.67 347,425.15 347,425.15 346,895.51 664,877.25
13 Chipping M3 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
14 Chipping (kg) Kg 249.03 249.03 248.78 248.78 248.42 248.42 248.28 248.28 248.49 248.49 248.85 248.85 249.02 249.02 248.64 476.56
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
18 Kapur M3 99,347.08 99,347.08 99,246.67 99,246.67 99,102.30 99,102.30 99,047.83 99,047.83 99,131.73 99,131.73 99,274.03 99,274.03 99,342.51 99,342.51 99,191.06 190,114.54
19 Pasir Beton (Kasar) M3 471,957.62 471,957.62 471,480.63 471,480.63 470,794.78 470,794.78 470,536.01 470,536.01 470,934.56 470,934.56 471,610.60 471,610.60 471,935.90 471,935.90 471,216.44 903,156.95
20 Pasir Halus (untuk HRS) M3 421,749.36 421,749.36 421,323.12 421,323.12 420,710.23 420,710.23 420,478.99 420,478.99 420,835.14 420,835.14 421,439.26 421,439.26 421,729.95 421,729.95 421,087.03 807,076.43
21 Pasir Pasang (Sedang) M3 401,666.06 401,666.06 401,260.11 401,260.11 400,676.41 400,676.41 400,456.18 400,456.18 400,795.37 400,795.37 401,370.72 401,370.72 401,647.57 401,647.57 401,035.27 768,644.22
22 Pasir Urug M3 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
23 Pasir Urug (ada unsur lempung) M3 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
24 Sirtu M3 159,277.66 159,277.66 159,116.69 159,116.69 158,885.23 158,885.23 158,797.90 158,797.90 158,932.40 158,932.40 159,160.55 159,160.55 159,270.33 159,270.33 159,027.53 304,800.10
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21 69,178.58 132,591.13
26 Anti Pengelupas Liter 100,341.20 100,341.20 100,239.79 100,239.79 100,093.98 100,093.98 100,038.96 100,038.96 100,123.69 100,123.69 100,267.42 100,267.42 100,336.58 100,336.58 100,183.62 192,016.93
27 Arbocell Kg 167,695.58 167,695.58 167,526.10 167,526.10 167,282.40 167,282.40 167,190.46 167,190.46 167,332.07 167,332.07 167,572.28 167,572.28 167,687.86 167,687.86 167,432.23 320,908.96
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
40 Beton B-0 M3 586,150.18 586,150.18 585,557.79 585,557.79 584,705.99 584,705.99 584,384.61 584,384.61 584,879.59 584,879.59 585,719.20 585,719.20 586,123.20 586,123.20 585,229.67 1,121,680.40
41 Beton K-125 (fc' 10 MPa) M3 606,019.68 606,019.68 605,407.20 605,407.20 604,526.53 604,526.53 604,194.26 604,194.26 604,706.02 604,706.02 605,574.08 605,574.08 605,991.79 605,991.79 605,067.97 1,159,703.47
42 Beton K-175 (fc' 15 MPa) M3 655,693.43 655,693.43 655,030.74 655,030.74 654,077.89 654,077.89 653,718.38 653,718.38 654,272.09 654,272.09 655,211.30 655,211.30 655,663.24 655,663.24 654,663.70 1,254,761.13
43 Beton K-250 (fc' 20 MPa) M3 730,204.04 730,204.04 729,466.06 729,466.06 728,404.92 728,404.92 728,004.56 728,004.56 728,621.19 728,621.19 729,667.13 729,667.13 730,170.43 730,170.43 729,057.31 1,397,347.62
44 Beton K-300 (fc' 25 MPa) M3 792,286.30 767,182.18 791,485.57 766,406.82 790,334.22 765,291.94 789,899.82 764,871.31 790,568.87 765,519.16 791,703.75 766,618.08 792,249.83 767,146.86 791,042.07 1,491,086.01
45 Beton K-350 (fc' 30 MPa) M3 789,812.54 792,286.30 789,014.31 791,485.57 787,866.55 790,334.22 787,433.50 789,899.82 788,100.47 790,568.87 789,231.80 791,703.75 789,776.18 792,249.83 788,572.19 1,513,886.70
46 Beton K-400 (fc' 35 MPa) M3 819,616.78 819,616.78 818,788.43 818,788.43 817,597.36 817,597.36 817,147.98 817,147.98 817,840.11 817,840.11 819,014.13 819,014.13 819,579.05 819,579.05 818,329.63 1,568,451.41
47 Beton K-450 (fc' 40 MPa) M3 859,355.78 859,355.78 858,487.26 858,487.26 857,238.44 857,238.44 856,767.27 856,767.27 857,492.96 857,492.96 858,723.91 858,723.91 859,316.22 859,316.22 858,006.22 1,644,497.54
48 Beton K-500 (fc' 45 MPa) M3 894,127.40 894,127.40 893,223.74 893,223.74 891,924.39 891,924.39 891,434.15 891,434.15 892,189.21 892,189.21 893,469.96 893,469.96 894,086.24 894,086.24 892,723.23 1,711,037.91
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
51 Cat Anti Karat Kg 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
52 Cat Marka (Non Thermoplas) Kg 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
53 Cat Marka (Thermoplastic) Kg 49,043.43 49,043.43 48,993.86 48,993.86 48,922.59 48,922.59 48,895.70 48,895.70 48,937.12 48,937.12 49,007.37 49,007.37 49,041.17 49,041.17 48,966.41 93,851.46
54 Cerucuk Diameter 10-15 cm M' 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,296,377.21 1,296,377.21 1,295,067.02 1,295,067.02 1,293,183.11 1,293,183.11 1,292,472.33 1,292,472.33 1,293,567.07 1,293,567.07 1,295,424.00 1,295,424.00 1,296,317.53 1,296,317.53 1,294,341.34 2,480,799.21
57 Curing Compound Liter 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 606,515.75 606,515.75 605,902.77 605,902.77 605,021.38 605,021.38 604,688.84 604,688.84 605,201.01 605,201.01 606,069.79 606,069.79 606,487.83 606,487.83 605,563.26 1,160,652.77
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 704,923.94 704,923.94 704,211.50 704,211.50 703,187.10 703,187.10 702,800.60 702,800.60 703,395.88 703,395.88 704,405.62 704,405.62 704,891.49 704,891.49 703,816.90 1,348,970.60
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 893,706.98 893,706.98 892,803.75 892,803.75 891,505.01 891,505.01 891,015.01 891,015.01 891,769.71 891,769.71 893,049.85 893,049.85 893,665.84 893,665.84 892,303.48 1,710,233.38
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 49,706.17 49,706.17 49,655.94 49,655.94 49,583.71 49,583.71 49,556.45 49,556.45 49,598.43 49,598.43 49,669.63 49,669.63 49,703.89 49,703.89 49,628.11 95,119.72
64 Oxygen (Isi 6 M3) Botol 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,370,685.43 1,370,685.43 1,369,300.14 1,369,300.14 1,367,308.25 1,367,308.25 1,366,556.72 1,366,556.72 1,367,714.21 1,367,714.21 1,369,677.59 1,369,677.59 1,370,622.33 1,370,622.33 1,368,532.86 2,622,998.39
67 Seal Coat M2 109,454.00 109,454.00 109,343.38 109,343.38 109,184.32 109,184.32 109,124.31 109,124.31 109,216.74 109,216.74 109,373.52 109,373.52 109,448.96 109,448.96 109,282.11 209,455.55
68 Seal Guard Kg 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
69 Semen/PC (50 kg) Zak 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
77 Baja Tulangan (Polos) U25 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
78 Baja Tulangan (Polos) U32 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
79 Baja Tulangan (Polos) U36 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
80 Baja Tulangan (Ulir) D16 Kg 13,269.04 13,269.04 13,255.63 13,255.63 13,236.35 13,236.35 13,229.07 13,229.07 13,240.28 13,240.28 13,259.28 13,259.28 13,268.43 13,268.43 13,248.20 25,392.16
81 Baja Tulangan (Ulir) D19 Kg 13,269.04 13,269.04 13,255.63 13,255.63 13,236.35 13,236.35 13,229.07 13,229.07 13,240.28 13,240.28 13,259.28 13,259.28 13,268.43 13,268.43 13,248.20 25,392.16
82 Baja Tulangan (Ulir) D24 Kg 13,269.04 13,269.04 13,255.63 13,255.63 13,236.35 13,236.35 13,229.07 13,229.07 13,240.28 13,240.28 13,259.28 13,259.28 13,268.43 13,268.43 13,248.20 25,392.16
83 Baja Tulangan (Ulir) D32 Kg 13,269.04 13,269.04 13,255.63 13,255.63 13,236.35 13,236.35 13,229.07 13,229.07 13,240.28 13,240.28 13,259.28 13,259.28 13,268.43 13,268.43 13,248.20 25,392.16
84 Baja Tulangan (Ulir) D36 Kg 13,269.04 13,269.04 13,255.63 13,255.63 13,236.35 13,236.35 13,229.07 13,229.07 13,240.28 13,240.28 13,259.28 13,259.28 13,268.43 13,268.43 13,248.20 25,392.16
85 Besi Beton Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,706,705.82 12,706,705.82 12,693,863.68 12,693,863.68 12,675,398.23 12,675,398.23 12,668,431.33 12,668,431.33 12,679,161.65 12,679,161.65 12,697,362.76 12,697,362.76 12,706,120.90 12,706,120.90 12,686,750.78 24,316,059.79
87 Box Culvert Type DUB 200×200 M' 13,709,953.46 13,709,953.46 13,696,097.38 13,696,097.38 13,676,174.00 13,676,174.00 13,668,657.04 13,668,657.04 13,680,234.56 13,680,234.56 13,699,872.73 13,699,872.73 13,709,322.35 13,709,322.35 13,688,422.89 26,235,914.54
88 Box Culvert Type uk 300×200 M' 14,802,775.83 14,802,775.83 14,787,815.29 14,787,815.29 14,766,303.81 14,766,303.81 14,758,187.67 14,758,187.67 14,770,688.04 14,770,688.04 14,791,891.57 14,791,891.57 14,802,094.43 14,802,094.43 14,779,529.06 28,327,183.09
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 192,799.71 192,799.71 192,604.85 192,604.85 192,324.68 192,324.68 192,218.97 192,218.97 192,381.78 192,381.78 192,657.95 192,657.95 192,790.83 192,790.83 192,496.93 368,949.22
91 Ducting (Strand Prestress) M' 167,695.58 167,695.58 167,526.10 167,526.10 167,282.40 167,282.40 167,190.46 167,190.46 167,332.07 167,332.07 167,572.28 167,572.28 167,687.86 167,687.86 167,432.23 320,908.96
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,161,967.57 2,161,967.57 2,159,782.56 2,159,782.56 2,156,640.78 2,156,640.78 2,155,455.40 2,155,455.40 2,157,281.10 2,157,281.10 2,160,377.91 2,160,377.91 2,161,868.05 2,161,868.05 2,158,572.34 4,137,227.50
94 Expansion Join Tipe Rubber M' 1,565,493.47 1,565,493.47 1,563,911.29 1,563,911.29 1,561,636.31 1,561,636.31 1,560,777.97 1,560,777.97 1,562,099.97 1,562,099.97 1,564,342.39 1,564,342.39 1,565,421.41 1,565,421.41 1,563,034.97 2,995,790.83
95 Expansion Join Tipe Torma M' 1,795,447.29 1,795,447.29 1,793,632.71 1,793,632.71 1,791,023.55 1,791,023.55 1,790,039.14 1,790,039.14 1,791,555.32 1,791,555.32 1,794,127.12 1,794,127.12 1,795,364.64 1,795,364.64 1,792,627.66 3,435,839.65
96 Expansion Tipe Joint Asphaltic Plug M' 2,129,834.28 2,129,834.28 2,127,681.75 2,127,681.75 2,124,586.66 2,124,586.66 2,123,418.91 2,123,418.91 2,125,217.47 2,125,217.47 2,128,268.25 2,128,268.25 2,129,736.24 2,129,736.24 2,126,489.52 4,075,735.96
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
99 Glass Bead Kg 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
100 Joint Sealent Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
101 Joint Socket Pile 16×16×16 Set 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
102 Joint Socket Pile 35×35 Set 777,223.83 777,223.83 776,438.32 776,438.32 775,308.85 775,308.85 774,882.71 774,882.71 775,539.05 775,539.05 776,652.35 776,652.35 777,188.05 777,188.05 776,003.25 1,487,326.56
103 Kawat Beton Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
104 Kawat Bronjong Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
105 Kawat Las Dos 109,454.00 109,454.00 109,343.38 109,343.38 109,184.32 109,184.32 109,124.31 109,124.31 109,216.74 109,216.74 109,373.52 109,373.52 109,448.96 109,448.96 109,282.11 209,455.55
106 Kayu Acuan (Kelas III/Meranti) M3 4,271,718.55 4,271,718.55 4,267,401.31 4,267,401.31 4,261,193.62 4,261,193.62 4,258,851.50 4,258,851.50 4,262,458.80 4,262,458.80 4,268,577.62 4,268,577.62 4,271,521.91 4,271,521.91 4,265,010.10 8,174,531.24
107 Kayu Perancah (Gelam) M3 2,959,766.74 2,959,766.74 2,956,775.43 2,956,775.43 2,952,474.28 2,952,474.28 2,950,851.48 2,950,851.48 2,953,350.89 2,953,350.89 2,957,590.47 2,957,590.47 2,959,630.50 2,959,630.50 2,955,118.62 5,663,927.85
108 Kerb Pracetak Type 1 (Peninggi) Buah 54,224.92 54,224.92 54,170.12 54,170.12 54,091.32 54,091.32 54,061.58 54,061.58 54,107.38 54,107.38 54,185.05 54,185.05 54,222.42 54,222.42 54,139.76 103,766.97
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
110 Marmer Nama Jembatan Buah 596,474.10 596,474.10 595,871.27 595,871.27 595,004.47 595,004.47 594,677.43 594,677.43 595,181.13 595,181.13 596,035.52 596,035.52 596,446.64 596,446.64 595,537.38 1,141,436.66
111 Mata Kucing Buah 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55 156,403.76 299,771.24
112 Matras Concrete (Tebal=10 cm) M2 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
113 Mini Pile 16×16×16 M' 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 257,495.81
114 Mini Timber Pile Buah 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
115 Multipleks 12 mm Lbr 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,044,946.13 66,044,946.13 65,978,197.28 65,978,197.28 65,882,220.39 65,882,220.39 65,846,008.95 65,846,008.95 65,901,781.33 65,901,781.33 65,996,384.24 65,996,384.24 66,041,905.93 66,041,905.93 65,941,226.95 126,386,246.92
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 93,563,087.93 93,563,087.93 93,468,527.64 93,468,527.64 93,332,561.23 93,332,561.23 93,281,262.01 93,281,262.01 93,360,272.39 93,360,272.39 93,494,292.34 93,494,292.34 93,558,780.99 93,558,780.99 93,416,153.34 179,046,062.19
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 178,825,746.72 178,825,746.72 178,645,015.05 178,645,015.05 178,385,144.45 178,385,144.45 178,287,097.00 178,287,097.00 178,438,108.38 178,438,108.38 178,694,258.73 178,694,258.73 178,817,514.94 178,817,514.94 178,544,912.82 342,208,091.65
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 234,501,683.50 234,501,683.50 234,264,682.50 234,264,682.50 233,923,903.31 233,923,903.31 233,795,329.60 233,795,329.60 233,993,357.14 233,993,357.14 234,329,257.81 234,329,257.81 234,490,888.83 234,490,888.83 234,133,414.26 448,751,788.11
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 298,926,911.25 298,926,911.25 298,624,798.38 298,624,798.38 298,190,396.08 298,190,396.08 298,026,498.99 298,026,498.99 298,278,931.12 298,278,931.12 298,707,114.62 298,707,114.62 298,913,150.93 298,913,150.93 298,457,466.48 572,038,477.22
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 360,654,951.40 360,654,951.40 360,290,452.59 360,290,452.59 359,766,346.75 359,766,346.75 359,568,605.11 359,568,605.11 359,873,164.17 359,873,164.17 360,389,767.03 360,389,767.03 360,638,349.59 360,638,349.59 360,088,566.87 690,163,720.42
124 Pelat Rambu (Eng. Grade) Buah 192,799.71 192,799.71 192,604.85 192,604.85 192,324.68 192,324.68 192,218.97 192,218.97 192,381.78 192,381.78 192,657.95 192,657.95 192,790.83 192,790.83 192,496.93 368,949.22
125 Pelat Rambu (High L Grade) Buah 334,387.00 334,387.00 334,049.04 334,049.04 333,563.11 333,563.11 333,379.77 333,379.77 333,662.15 333,662.15 334,141.13 334,141.13 334,371.60 334,371.60 333,861.86 639,896.31
126 Pemantul Cahaya (Reflector) Buah 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
127 Pipa Baja D10" Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
128 Pipa Drainase Baja Dia 3" M' 273,132.92 273,132.92 272,856.88 272,856.88 272,459.96 272,459.96 272,310.20 272,310.20 272,540.85 272,540.85 272,932.09 272,932.09 273,120.35 273,120.35 272,703.98 522,678.07
129 Pipa Galvanis Dia 1,5" M' 108,449.84 108,449.84 108,340.23 108,340.23 108,182.63 108,182.63 108,123.17 108,123.17 108,214.75 108,214.75 108,370.09 108,370.09 108,444.84 108,444.84 108,279.52 207,533.94
130 Pipa Galvanis Dia 2" M' 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 599,542.49
131 Pipa Galvanis Dia 3" M' 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
132 Pipa Porus M' 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
133 Pipa PVC Dia 4" M' 215,895.51 215,895.51 215,677.31 215,677.31 215,363.57 215,363.57 215,245.20 215,245.20 215,427.51 215,427.51 215,736.76 215,736.76 215,885.57 215,885.57 215,556.46 413,146.27
134 Plastik Filter M2 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
135 Rel Pengaman M' 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 284,398.36
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,040,463.59 2,040,463.59 2,038,401.38 2,038,401.38 2,035,436.16 2,035,436.16 2,034,317.41 2,034,317.41 2,036,040.50 2,036,040.50 2,038,963.26 2,038,963.26 2,040,369.66 2,040,369.66 2,037,259.17 3,904,712.62
137 Strip Bearing Buah 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 599,542.49
138 Tiang Pancang Baja Diameter 400 M' 722,998.91 722,998.91 722,268.20 722,268.20 721,217.54 721,217.54 720,821.13 720,821.13 721,431.67 721,431.67 722,467.30 722,467.30 722,965.63 722,965.63 721,863.49 1,383,559.59
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 883,665.33 883,665.33 882,772.25 882,772.25 881,488.10 881,488.10 881,003.60 881,003.60 881,749.82 881,749.82 883,015.59 883,015.59 883,624.66 883,624.66 882,277.60 1,691,017.28
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,847,663.88 1,847,663.88 1,845,796.52 1,845,796.52 1,843,111.49 1,843,111.49 1,842,098.44 1,842,098.44 1,843,658.72 1,843,658.72 1,846,305.32 1,846,305.32 1,847,578.83 1,847,578.83 1,844,762.24 3,535,763.40
HARGA SATUAN DASAR UPAH KABUPATEN NGANJUK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
2 Tukang OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
3 Mandor OH 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
4 Operator OH 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
5 Pembantu Operator OH 195,000 195,000 195,527.60 195,527.60 195,797.15 195,797.15 195,802.60 195,802.60 195,544.00 195,544.00 195,264.68 195,264.68 195,222.41 195,222.41 195,451.59 195,451.59 195,735.84 195,735.84
6 Sopir OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
7 Pembantu Sopir OH 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
8 Mekanik OH 176,000 176,000 176,476.19 176,476.19 176,719.48 176,719.48 176,724.40 176,724.40 176,490.99 176,490.99 176,238.89 176,238.89 176,200.74 176,200.74 176,407.59 176,407.59 176,664.14 176,664.14
9 Pembantu Mekanik OH 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
10 Kepala Tukang OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
11 Pemasak Aspal OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94

HARGA SATUAN DASAR ALAT KABUPATEN NGANJUK TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 459,766 513,000 461,010.17 514,388.00 461,645.71 515,097.13 461,658.56 515,111.47 461,048.83 514,431.14 460,390.26 513,696.32 460,290.60 513,585.11 460,830.94 514,188.03 461,501.15 514,935.83
2 Asphalt Distribution Unit/Jam 283,083 364,000 283,849.15 364,984.86 284,240.46 365,488.02 284,248.37 365,498.20 283,872.95 365,015.46 283,467.46 364,494.07 283,406.10 364,415.17 283,738.80 364,842.97 284,151.45 365,373.57
3 Asphalt Finisher Unit/Jam 207,920 208,000 208,482.30 208,562.78 208,769.72 208,850.30 208,775.53 208,856.11 208,499.79 208,580.27 208,201.96 208,282.33 208,156.89 208,237.24 208,401.25 208,481.69 208,704.34 208,784.90
4 Asphalt Liquid Mixer Unit/Jam 74,187 136,000 74,388.05 136,367.97 74,490.60 136,555.96 74,492.68 136,559.77 74,394.29 136,379.40 74,288.02 136,184.60 74,271.94 136,155.12 74,359.13 136,314.95 74,467.28 136,513.20
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 99,567 100,000 99,836.60 100,270.57 99,974.23 100,408.80 99,977.01 100,411.59 99,844.97 100,278.97 99,702.35 100,135.73 99,680.77 100,114.06 99,797.78 100,231.58 99,942.92 100,377.35
6 Asphalt Mixing Plant Unit/Jam 1,112,810 5,708,128 1,115,820.79 5,723,572.38 1,117,359.04 5,731,462.83 1,117,390.15 5,731,622.38 1,115,914.36 5,724,052.35 1,114,320.37 5,715,876.04 1,114,079.15 5,714,638.70 1,115,387.00 5,721,347.28 1,117,009.15 5,729,668.06
7 Asphalt Sprayer Unit/Jam 91,758 92,000 92,006.28 92,248.92 92,133.11 92,376.09 92,135.68 92,378.66 92,013.99 92,256.66 91,882.56 92,124.88 91,862.67 92,104.93 91,970.51 92,213.06 92,104.26 92,347.17
8 Asphalt Tanker Unit/Jam 429,506 498,000 430,667.67 499,347.42 431,261.39 500,035.81 431,273.39 500,049.73 430,703.79 499,389.29 430,088.56 498,675.96 429,995.46 498,568.01 430,500.24 499,153.29 431,126.34 499,879.23
9 Blending Equipment Unit/Jam 139,589 221,000 139,966.99 221,597.95 140,159.95 221,903.44 140,163.85 221,909.62 139,978.73 221,616.53 139,778.78 221,299.97 139,748.52 221,252.07 139,912.58 221,511.80 140,116.06 221,833.95
10 Bore Pile Machine Unit/Jam 384,603 669,000 385,643.32 670,810.08 386,174.97 671,734.85 386,185.72 671,753.55 385,675.66 670,866.34 385,124.76 669,908.06 385,041.39 669,763.04 385,493.40 670,549.30 386,054.04 671,524.50
11 Bore Pile Machine Dia 60 Unit/Jam 251,846 761,000 252,527.86 763,059.00 252,875.99 764,110.95 252,883.03 764,132.22 252,549.04 763,122.99 252,188.29 762,032.94 252,133.70 761,867.98 252,429.69 762,762.35 252,796.81 763,871.67
12 Bore Pile Machine Dia 80 Unit/Jam 995,672 996,000 998,365.97 998,694.83 999,742.30 1,000,071.62 999,770.13 1,000,099.46 998,449.69 998,778.58 997,023.49 997,351.91 996,807.66 997,136.01 997,977.84 998,306.58 999,429.24 999,758.45
13 Bulldozer 100-150 HP Unit/Jam 390,460 390,460 391,516.07 391,516.07 392,055.81 392,055.81 392,066.72 392,066.72 391,548.90 391,548.90 390,989.60 390,989.60 390,904.96 390,904.96 391,363.86 391,363.86 391,933.03 391,933.03
14 Cement Tanker Unit/Jam 363,127 469,000 364,109.94 470,268.95 364,611.90 470,917.26 364,622.05 470,930.37 364,140.47 470,308.39 363,620.33 469,636.59 363,541.62 469,534.93 363,968.39 470,086.13 364,497.72 470,769.79
15 Cold Milling Unit/Jam 567,143 1,207,000 568,677.09 1,210,265.72 569,461.06 1,211,934.18 569,476.91 1,211,967.92 568,724.77 1,210,367.21 567,912.40 1,208,638.31 567,789.46 1,208,376.67 568,456.01 1,209,795.22 569,282.73 1,211,554.67
16 Cold Recycler Unit/Jam 4,776,297 4,776,297 4,789,220.27 4,789,220.27 4,795,822.64 4,795,822.64 4,795,956.14 4,795,956.14 4,789,621.89 4,789,621.89 4,782,780.33 4,782,780.33 4,781,744.98 4,781,744.98 4,787,358.40 4,787,358.40 4,794,320.85 4,794,320.85
17 Compressor 4000-6500 L\M Unit/Jam 145,446 145,446 145,839.73 145,839.73 146,040.79 146,040.79 146,044.85 146,044.85 145,851.96 145,851.96 145,643.63 145,643.63 145,612.10 145,612.10 145,783.04 145,783.04 145,995.06 145,995.06
18 Concrete Breaker Unit/Jam 530,049 1,010,000 531,483.06 1,012,732.71 532,215.76 1,014,128.85 532,230.57 1,014,157.08 531,527.63 1,012,817.64 530,768.39 1,011,370.91 530,653.49 1,011,151.98 531,276.44 1,012,339.00 532,049.09 1,013,811.28
19 Concrete Mixer (350) Unit/Jam 98,591 99,000 98,857.81 99,267.86 98,994.09 99,404.71 98,996.85 99,407.48 98,866.10 99,276.18 98,724.87 99,134.38 98,703.50 99,112.92 98,819.37 99,229.27 98,963.09 99,373.58
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 112,257 112,257 112,560.87 112,560.87 112,716.04 112,716.04 112,719.18 112,719.18 112,570.31 112,570.31 112,409.51 112,409.51 112,385.18 112,385.18 112,517.11 112,517.11 112,680.75 112,680.75
21 Concrete Pan Mixer Unit/Jam 298,702 639,000 299,509.79 640,728.91 299,922.69 641,612.21 299,931.04 641,630.07 299,534.91 640,782.64 299,107.05 639,867.34 299,042.30 639,728.83 299,393.35 640,479.82 299,828.77 641,411.30
22 Concrete Pump Unit/Jam 227,443 244,000 228,058.11 244,660.18 228,372.51 244,997.47 228,378.86 245,004.29 228,077.23 244,680.70 227,751.44 244,331.19 227,702.14 244,278.30 227,969.45 244,565.06 228,300.99 244,920.75
23 Concrete Vibrator Unit/Jam 84,925 85,000 85,154.74 85,229.98 85,272.14 85,347.48 85,274.51 85,349.85 85,161.89 85,237.13 85,040.24 85,115.37 85,021.83 85,096.95 85,121.64 85,196.85 85,245.44 85,320.75
24 Crane 10-15 Ton Unit/Jam 304,559 305,000 305,382.53 305,825.22 305,803.53 306,246.83 305,812.04 306,255.36 305,408.14 305,850.87 304,971.89 305,413.99 304,905.87 305,347.87 305,263.81 305,706.33 305,707.77 306,150.93
25 Crane On Track 35 Ton Unit/Jam 252,823 480,000 253,506.65 481,298.71 253,856.13 481,962.23 253,863.20 481,975.64 253,527.91 481,339.07 253,165.77 480,651.52 253,110.96 480,547.47 253,408.10 481,111.60 253,776.64 481,811.30
26 Crane On Track 75-100 Ton Unit/Jam 397,293 397,293 398,367.60 398,367.60 398,916.78 398,916.78 398,927.89 398,927.89 398,401.00 398,401.00 397,831.92 397,831.92 397,745.80 397,745.80 398,212.73 398,212.73 398,791.86 398,791.86
27 Dump Truck 10 Ton Unit/Jam 375,817 375,817 376,834.21 376,834.21 377,353.71 377,353.71 377,364.22 377,364.22 376,865.81 376,865.81 376,327.49 376,327.49 376,246.03 376,246.03 376,687.71 376,687.71 377,235.55 377,235.55
28 Dump Truck 3-4 M3 Unit/Jam 204,991 268,000 205,545.93 268,725.12 205,829.30 269,095.58 205,835.03 269,103.07 205,563.17 268,747.65 205,269.54 268,363.77 205,225.11 268,305.67 205,466.03 268,620.64 205,764.84 269,011.31
29 Excavator 80-140 HP Unit/Jam 296,749 471,000 297,552.21 472,274.36 297,962.41 472,925.43 297,970.71 472,938.60 297,577.16 472,313.97 297,152.10 471,639.31 297,087.77 471,537.21 297,436.53 472,090.76 297,869.11 472,777.34
30 Flat Bed Truck 3-4 M3 Unit/Jam 360,199 481,000 361,173.57 482,301.42 361,671.48 482,966.31 361,681.55 482,979.76 361,203.86 482,341.86 360,687.91 481,652.88 360,609.83 481,548.62 361,033.16 482,113.92 361,558.22 482,815.08
31 Fulvi Mixer Unit/Jam 901,962 1,409,000 904,402.11 1,412,812.27 905,648.91 1,414,759.95 905,674.12 1,414,799.34 904,477.95 1,412,930.74 903,185.98 1,410,912.49 902,990.47 1,410,607.07 904,050.51 1,412,263.02 905,365.31 1,414,316.93
32 Generator Set Unit/Jam 401,197 426,000 402,282.76 427,152.61 402,837.34 427,741.48 402,848.55 427,753.38 402,316.49 427,188.43 401,741.82 426,578.23 401,654.85 426,485.88 402,126.37 426,986.55 402,711.19 427,607.53
33 Hot Recycler Unit/Jam 2,946,994 8,642,000 2,954,967.50 8,665,382.26 2,959,041.19 8,677,328.25 2,959,123.56 8,677,569.81 2,955,215.30 8,666,108.92 2,950,994.04 8,653,730.14 2,950,355.22 8,651,856.83 2,953,818.73 8,662,013.48 2,958,114.58 8,674,610.99
34 Jack Hammer Unit/Jam 55,640 56,000 55,791.04 56,151.52 55,867.95 56,228.93 55,869.51 56,230.49 55,795.72 56,156.23 55,716.02 56,076.01 55,703.96 56,063.87 55,769.35 56,129.69 55,850.46 56,211.32
35 Launching Gantry Unit/Jam 70,808,875 70,809,000 71,000,459.69 71,000,584.60 71,098,340.10 71,098,465.19 71,100,319.31 71,100,444.40 71,006,413.68 71,006,538.61 70,904,987.19 70,905,111.94 70,889,638.07 70,889,762.79 70,972,857.41 70,972,982.27 71,076,076.06 71,076,201.10
36 Motor Grader > 100 HP Unit/Jam 278,202 289,000 278,955.20 289,781.93 279,339.76 290,181.42 279,347.54 290,189.50 278,978.59 289,806.23 278,580.09 289,392.27 278,519.79 289,329.63 278,846.75 289,669.28 279,252.29 290,090.56
37 Pedestrian Roller Unit/Jam 91,758 91,758 92,006.28 92,006.28 92,133.11 92,133.11 92,135.68 92,135.68 92,013.99 92,013.99 91,882.56 91,882.56 91,862.67 91,862.67 91,970.51 91,970.51 92,104.26 92,104.26
38 Pile Driver + Hammer Unit/Jam 104,448 306,000 104,730.55 306,827.93 104,874.93 307,250.92 104,877.85 307,259.47 104,739.33 306,853.66 104,589.72 306,415.35 104,567.08 306,349.02 104,689.83 306,708.65 104,842.09 307,154.71
39 Rock Drill Breaker Unit/Jam 101,520 330,000 101,794.18 330,892.87 101,934.51 331,349.03 101,937.35 331,358.25 101,802.71 330,920.61 101,657.30 330,447.92 101,635.29 330,376.39 101,754.60 330,764.23 101,902.59 331,245.27
40 Split Form Paver Unit/Jam 214,753 215,000 215,333.84 215,581.72 215,630.69 215,878.91 215,636.70 215,884.92 215,351.89 215,599.79 215,044.28 215,291.83 214,997.73 215,245.22 215,250.12 215,497.91 215,563.17 215,811.31
41 Stone Crusher Unit/Jam 574,952 574,952 576,507.41 576,507.41 577,302.17 577,302.17 577,318.24 577,318.24 576,555.75 576,555.75 575,732.19 575,732.19 575,607.56 575,607.56 576,283.28 576,283.28 577,121.39 577,121.39
42 Tamper Unit/Jam 85,901 85,901 86,133.53 86,133.53 86,252.28 86,252.28 86,254.68 86,254.68 86,140.76 86,140.76 86,017.71 86,017.71 85,999.09 85,999.09 86,100.05 86,100.05 86,225.27 86,225.27
43 Tandem Roller 6-8 T Unit/Jam 414,863 415,000 415,985.82 416,122.85 416,559.29 416,696.51 416,570.89 416,708.11 416,020.70 416,157.74 415,426.45 415,563.30 415,336.52 415,473.34 415,824.10 415,961.07 416,428.85 416,566.02
44 Three Wheel Roller 6-8 T Unit/Jam 137,637 137,637 138,009.41 138,009.41 138,199.67 138,199.67 138,203.52 138,203.52 138,020.99 138,020.99 137,823.84 137,823.84 137,794.00 137,794.00 137,955.76 137,955.76 138,156.39 138,156.39
45 Tire Roller 8-10 T Unit/Jam 245,990 245,990 246,655.12 246,655.12 246,995.16 246,995.16 247,002.03 247,002.03 246,675.81 246,675.81 246,323.45 246,323.45 246,270.13 246,270.13 246,559.23 246,559.23 246,917.81 246,917.81
46 Track Loader 75-100 HP Unit/Jam 230,371 298,000 230,994.48 298,806.28 231,312.92 299,218.22 231,319.36 299,226.55 231,013.85 298,831.34 230,683.87 298,404.49 230,633.93 298,339.89 230,904.68 298,690.12 231,240.49 299,124.52
47 Trailer 20 Ton Unit/Jam 371,913 371,913 372,919.05 372,919.05 373,433.15 373,433.15 373,443.55 373,443.55 372,950.32 372,950.32 372,417.60 372,417.60 372,336.98 372,336.98 372,774.08 372,774.08 373,316.22 373,316.22
48 Trailler 15 Ton Unit/Jam 322,129 322,129 323,000.75 323,000.75 323,446.04 323,446.04 323,455.04 323,455.04 323,027.84 323,027.84 322,566.42 322,566.42 322,496.60 322,496.60 322,875.18 322,875.18 323,344.75 323,344.75
49 Truck Mixer (agitator) Unit/Jam 405,102 595,000 406,197.92 596,609.86 406,757.90 597,432.34 406,769.22 597,448.97 406,231.98 596,659.89 405,651.71 595,807.62 405,563.90 595,678.64 406,040.00 596,377.92 406,630.52 597,245.26
50 Vibrating Rammer Unit/Jam 82,973 82,973 83,197.16 83,197.16 83,311.86 83,311.86 83,314.18 83,314.18 83,204.14 83,204.14 83,085.29 83,085.29 83,067.30 83,067.30 83,164.82 83,164.82 83,285.77 83,285.77
51 Vibratory Roller 5-8 T Unit/Jam 200,111 244,000 200,651.98 244,660.18 200,928.60 244,997.47 200,934.19 245,004.29 200,668.81 244,680.70 200,382.17 244,331.19 200,338.79 244,278.30 200,573.98 244,565.06 200,865.68 244,920.75
52 Water Pump 70-100 MM Unit/Jam 62,474 62,474 62,642.57 62,642.57 62,728.93 62,728.93 62,730.68 62,730.68 62,647.82 62,647.82 62,558.34 62,558.34 62,544.79 62,544.79 62,618.22 62,618.22 62,709.29 62,709.29
53 Water Tanker 3000-4500 L Unit/Jam 226,467 226,467 227,079.32 227,079.32 227,392.37 227,392.37 227,398.70 227,398.70 227,098.36 227,098.36 226,773.97 226,773.97 226,724.88 226,724.88 226,991.04 226,991.04 227,321.16 227,321.16
54 Welding Set Unit/Jam 126,899 126,899 127,242.72 127,242.72 127,418.14 127,418.14 127,421.68 127,421.68 127,253.39 127,253.39 127,071.62 127,071.62 127,044.11 127,044.11 127,193.25 127,193.25 127,378.24 127,378.24
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 220,610 293,000 221,206.58 293,792.76 221,511.53 294,197.78 221,517.70 294,205.97 221,225.13 293,817.39 220,909.13 293,397.70 220,861.31 293,334.19 221,120.58 293,678.54 221,442.16 294,105.65
HARGA SATUAN DASAR BAHAN KABUPATEN NGANJUK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
2 Agregat Pecah Mesin 20-30 mm M3 293,000 293,000 293,792.76 293,792.76 294,197.78 294,197.78 294,205.97 294,205.97 293,817.39 293,817.39 293,397.70 293,397.70 293,334.19 293,334.19 293,678.54 293,678.54 294,105.65 294,105.65
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 360,000 360,000 360,974.04 360,974.04 361,471.67 361,471.67 361,481.73 361,481.73 361,004.31 361,004.31 360,488.64 360,488.64 360,410.61 360,410.61 360,833.70 360,833.70 361,358.48 361,358.48
4 Bahan Agr. Base Kelas A M3 322,000 322,000 322,871.22 322,871.22 323,316.33 323,316.33 323,325.33 323,325.33 322,898.30 322,898.30 322,437.06 322,437.06 322,367.26 322,367.26 322,745.70 322,745.70 323,215.08 323,215.08
5 Bahan Agr. Base Kelas B M3 303,000 303,000 303,819.81 303,819.81 304,238.66 304,238.66 304,247.12 304,247.12 303,845.29 303,845.29 303,411.27 303,411.27 303,345.59 303,345.59 303,701.70 303,701.70 304,143.38 304,143.38
6 Bahan Agr. Base Kelas C M3 278,000 278,000 278,752.17 278,752.17 279,136.46 279,136.46 279,144.23 279,144.23 278,775.55 278,775.55 278,377.34 278,377.34 278,317.08 278,317.08 278,643.80 278,643.80 279,049.05 279,049.05
7 Bahan Agr. Base Kelas C2 M3 254,000 254,000 254,687.24 254,687.24 255,038.34 255,038.34 255,045.44 255,045.44 254,708.59 254,708.59 254,344.76 254,344.76 254,289.71 254,289.71 254,588.22 254,588.22 254,958.48 254,958.48
8 Bahan Agr. Base Kelas S M3 206,000 206,000 206,557.36 206,557.36 206,842.12 206,842.12 206,847.88 206,847.88 206,574.69 206,574.69 206,279.61 206,279.61 206,234.96 206,234.96 206,477.06 206,477.06 206,777.35 206,777.35
9 Bahan Pilihan M3 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82 205,474.75 205,474.75 205,773.58 205,773.58
10 Bahan Tanah Timbunan M3 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
11 Batu Belah/Kerakal M3 333,000 333,000 333,900.98 333,900.98 334,361.29 334,361.29 334,370.60 334,370.60 333,928.98 333,928.98 333,451.99 333,451.99 333,379.81 333,379.81 333,771.17 333,771.17 334,256.59 334,256.59
12 Batu Kali M3 365,000 365,000 365,987.56 365,987.56 366,492.11 366,492.11 366,502.31 366,502.31 366,018.25 366,018.25 365,495.43 365,495.43 365,416.31 365,416.31 365,845.28 365,845.28 366,377.34 366,377.34
13 Chipping M3 217,000 217,000 217,587.13 217,587.13 217,887.09 217,887.09 217,893.16 217,893.16 217,605.37 217,605.37 217,294.54 217,294.54 217,247.50 217,247.50 217,502.54 217,502.54 217,818.86 217,818.86
14 Chipping (kg) Kg 265 265 265.72 265.72 266.08 266.08 266.09 266.09 265.74 265.74 265.36 265.36 265.30 265.30 265.61 265.61 266.00 266.00
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 390,000 390,000 391,055.20 391,055.20 391,594.31 391,594.31 391,605.21 391,605.21 391,088.00 391,088.00 390,529.36 390,529.36 390,444.82 390,444.82 390,903.18 390,903.18 391,471.68 391,471.68
18 Kapur M3 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
19 Pasir Beton (Kasar) M3 464,000 464,000 465,255.42 465,255.42 465,896.82 465,896.82 465,909.79 465,909.79 465,294.44 465,294.44 464,629.81 464,629.81 464,529.23 464,529.23 465,074.55 465,074.55 465,750.93 465,750.93
20 Pasir Halus (untuk HRS) M3 233,000 233,000 233,630.42 233,630.42 233,952.50 233,952.50 233,959.01 233,959.01 233,650.01 233,650.01 233,316.26 233,316.26 233,265.75 233,265.75 233,539.59 233,539.59 233,879.24 233,879.24
21 Pasir Pasang (Sedang) M3 328,000 328,000 328,887.45 328,887.45 329,340.85 329,340.85 329,350.02 329,350.02 328,915.03 328,915.03 328,445.21 328,445.21 328,374.11 328,374.11 328,759.60 328,759.60 329,237.72 329,237.72
22 Pasir Urug M3 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
23 Pasir Urug (ada unsur lempung) M3 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93 156,361.27 156,361.27 156,588.67 156,588.67
24 Sirtu M3 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
26 Anti Pengelupas Liter 98,000 98,000 98,265.15 98,265.15 98,400.62 98,400.62 98,403.36 98,403.36 98,273.39 98,273.39 98,133.02 98,133.02 98,111.78 98,111.78 98,226.95 98,226.95 98,369.81 98,369.81
27 Arbocell Kg 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 575,928 575,928 577,486.20 577,486.20 578,282.31 578,282.31 578,298.41 578,298.41 577,534.62 577,534.62 576,709.67 576,709.67 576,584.82 576,584.82 577,261.69 577,261.69 578,101.23 578,101.23
41 Beton K-125 (fc' 10 MPa) M3 595,451 595,451 597,062.00 597,062.00 597,885.10 597,885.10 597,901.75 597,901.75 597,112.07 597,112.07 596,259.15 596,259.15 596,130.07 596,130.07 596,829.88 596,829.88 597,697.88 597,697.88
42 Beton K-175 (fc' 15 MPa) M3 644,258 644,258 646,001.51 646,001.51 646,892.08 646,892.08 646,910.09 646,910.09 646,055.68 646,055.68 645,132.85 645,132.85 644,993.19 644,993.19 645,750.37 645,750.37 646,689.51 646,689.51
43 Beton K-250 (fc' 20 MPa) M3 717,470 717,470 719,410.77 719,410.77 720,402.54 720,402.54 720,422.60 720,422.60 719,471.10 719,471.10 718,443.40 718,443.40 718,287.87 718,287.87 719,131.09 719,131.09 720,176.95 720,176.95
44 Beton K-300 (fc' 25 MPa) M3 746,754 746,754 748,774.48 748,774.48 749,806.73 749,806.73 749,827.60 749,827.60 748,837.27 748,837.27 747,767.62 747,767.62 747,605.74 747,605.74 748,483.38 748,483.38 749,571.93 749,571.93
45 Beton K-350 (fc' 30 MPa) M3 776,038 776,038 778,138.18 778,138.18 779,210.91 779,210.91 779,232.60 779,232.60 778,203.43 778,203.43 777,091.84 777,091.84 776,923.62 776,923.62 777,835.67 777,835.67 778,966.91 778,966.91
46 Beton K-400 (fc' 35 MPa) M3 805,323 805,323 807,501.89 807,501.89 808,615.10 808,615.10 808,637.61 808,637.61 807,569.60 807,569.60 806,416.06 806,416.06 806,241.49 806,241.49 807,187.96 807,187.96 808,361.88 808,361.88
47 Beton K-450 (fc' 40 MPa) M3 844,369 844,369 846,653.49 846,653.49 847,820.68 847,820.68 847,844.28 847,844.28 846,724.49 846,724.49 845,515.02 845,515.02 845,331.99 845,331.99 846,324.34 846,324.34 847,555.19 847,555.19
48 Beton K-500 (fc' 45 MPa) M3 878,534 878,534 880,911.15 880,911.15 882,125.56 882,125.56 882,150.12 882,150.12 880,985.02 880,985.02 879,726.61 879,726.61 879,536.17 879,536.17 880,568.68 880,568.68 881,849.33 881,849.33
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 63,450 63,450 63,621.67 63,621.67 63,709.38 63,709.38 63,711.16 63,711.16 63,627.01 63,627.01 63,536.12 63,536.12 63,522.37 63,522.37 63,596.94 63,596.94 63,689.43 63,689.43
51 Cat Anti Karat Kg 71,000 71,000 71,192.10 71,192.10 71,290.25 71,290.25 71,292.23 71,292.23 71,198.07 71,198.07 71,096.37 71,096.37 71,080.98 71,080.98 71,164.42 71,164.42 71,267.92 71,267.92
52 Cat Marka (Non Thermoplas) Kg 63,450 63,450 63,621.36 63,621.36 63,709.07 63,709.07 63,710.84 63,710.84 63,626.70 63,626.70 63,535.81 63,535.81 63,522.06 63,522.06 63,596.63 63,596.63 63,689.12 63,689.12
53 Cat Marka (Thermoplastic) Kg 43,341 43,341 43,458.28 43,458.28 43,518.19 43,518.19 43,519.41 43,519.41 43,461.93 43,461.93 43,399.85 43,399.85 43,390.45 43,390.45 43,441.39 43,441.39 43,504.57 43,504.57
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,274,000 1,274,000 1,277,447.00 1,277,447.00 1,279,208.08 1,279,208.08 1,279,243.69 1,279,243.69 1,277,554.13 1,277,554.13 1,275,729.25 1,275,729.25 1,275,453.09 1,275,453.09 1,276,950.38 1,276,950.38 1,278,807.50 1,278,807.50
57 Curing Compound Liter 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 595,000 595,000 596,609.86 596,609.86 597,432.34 597,432.34 597,448.97 597,448.97 596,659.89 596,659.89 595,807.62 595,807.62 595,678.64 595,678.64 596,377.92 596,377.92 597,245.26 597,245.26
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 693,000 693,000 694,875.02 694,875.02 695,832.96 695,832.96 695,852.33 695,852.33 694,933.29 694,933.29 693,940.64 693,940.64 693,790.42 693,790.42 694,604.88 694,604.88 695,615.07 695,615.07
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 879,000 879,000 881,378.27 881,378.27 882,593.33 882,593.33 882,617.90 882,617.90 881,452.18 881,452.18 880,193.10 880,193.10 880,002.56 880,002.56 881,035.62 881,035.62 882,316.95 882,316.95
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
64 Oxygen (Isi 6 M3) Botol 167,000 167,000 167,451.84 167,451.84 167,682.69 167,682.69 167,687.36 167,687.36 167,465.89 167,465.89 167,226.68 167,226.68 167,190.48 167,190.48 167,386.75 167,386.75 167,630.18 167,630.18
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,347,000 1,347,000 1,350,644.51 1,350,644.51 1,352,506.50 1,352,506.50 1,352,544.15 1,352,544.15 1,350,757.78 1,350,757.78 1,348,828.34 1,348,828.34 1,348,536.35 1,348,536.35 1,350,119.44 1,350,119.44 1,352,082.97 1,352,082.97
67 Seal Coat M2 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
68 Seal Guard Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
69 Semen/PC (50 kg) Zak 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
78 Baja Tulangan (Polos) U32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
81 Baja Tulangan (Ulir) D19 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
82 Baja Tulangan (Ulir) D24 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,690,000 12,690,000 12,724,334.74 12,724,334.74 12,741,876.36 12,741,876.36 12,742,231.06 12,742,231.06 12,725,401.78 12,725,401.78 12,707,224.65 12,707,224.65 12,704,473.86 12,704,473.86 12,719,388.00 12,719,388.00 12,737,886.31 12,737,886.31
87 Box Culvert Type DUB 200×200 M' 13,471,000 13,471,000 13,507,447.86 13,507,447.86 13,526,069.07 13,526,069.07 13,526,445.60 13,526,445.60 13,508,580.57 13,508,580.57 13,489,284.74 13,489,284.74 13,486,364.65 13,486,364.65 13,502,196.67 13,502,196.67 13,521,833.45 13,521,833.45
88 Box Culvert Type uk 300×200 M' 14,545,000 14,545,000 14,584,353.73 14,584,353.73 14,604,459.55 14,604,459.55 14,604,866.10 14,604,866.10 14,585,576.75 14,585,576.75 14,564,742.52 14,564,742.52 14,561,589.63 14,561,589.63 14,578,683.88 14,578,683.88 14,599,886.24 14,599,886.24
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
91 Ducting (Strand Prestress) M' 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,124,000 2,124,000 2,129,746.81 2,129,746.81 2,132,682.85 2,132,682.85 2,132,742.22 2,132,742.22 2,129,925.41 2,129,925.41 2,126,882.99 2,126,882.99 2,126,422.58 2,126,422.58 2,128,918.84 2,128,918.84 2,132,015.01 2,132,015.01
94 Expansion Join Tipe Rubber M' 1,538,000 1,538,000 1,542,161.29 1,542,161.29 1,544,287.30 1,544,287.30 1,544,330.29 1,544,330.29 1,542,290.62 1,542,290.62 1,540,087.59 1,540,087.59 1,539,754.20 1,539,754.20 1,541,561.76 1,541,561.76 1,543,803.72 1,543,803.72
95 Expansion Join Tipe Torma M' 1,764,000 1,764,000 1,768,772.77 1,768,772.77 1,771,211.18 1,771,211.18 1,771,260.49 1,771,260.49 1,768,921.10 1,768,921.10 1,766,394.35 1,766,394.35 1,766,011.97 1,766,011.97 1,768,085.14 1,768,085.14 1,770,656.54 1,770,656.54
96 Expansion Tipe Joint Asphaltic Plug M' 2,092,000 2,092,000 2,097,660.23 2,097,660.23 2,100,552.04 2,100,552.04 2,100,610.51 2,100,610.51 2,097,836.13 2,097,836.13 2,094,839.56 2,094,839.56 2,094,386.08 2,094,386.08 2,096,844.74 2,096,844.74 2,099,894.26 2,099,894.26
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
99 Glass Bead Kg 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
100 Joint Sealent Kg 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
101 Joint Socket Pile 16×16×16 Set 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
102 Joint Socket Pile 35×35 Set 763,000 763,000 765,064.41 765,064.41 766,119.12 766,119.12 766,140.45 766,140.45 765,128.57 765,128.57 764,035.65 764,035.65 763,870.26 763,870.26 764,766.99 764,766.99 765,879.22 765,879.22
103 Kawat Beton Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
104 Kawat Bronjong Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
105 Kawat Las Dos 176,000 176,000 176,476.19 176,476.19 176,719.48 176,719.48 176,724.40 176,724.40 176,490.99 176,490.99 176,238.89 176,238.89 176,200.74 176,200.74 176,407.59 176,407.59 176,664.14 176,664.14
106 Kayu Acuan (Kelas III/Meranti) M3 4,197,000 4,197,000 4,208,355.63 4,208,355.63 4,214,157.22 4,214,157.22 4,214,274.53 4,214,274.53 4,208,708.53 4,208,708.53 4,202,696.76 4,202,696.76 4,201,786.98 4,201,786.98 4,206,719.58 4,206,719.58 4,212,837.58 4,212,837.58
107 Kayu Perancah (Gelam) M3 2,704,000 2,704,000 2,711,316.09 2,711,316.09 2,715,053.88 2,715,053.88 2,715,129.46 2,715,129.46 2,711,543.45 2,711,543.45 2,707,670.25 2,707,670.25 2,707,084.11 2,707,084.11 2,710,262.03 2,710,262.03 2,714,203.67 2,714,203.67
108 Kerb Pracetak Type 1 (Peninggi) Buah 54,000 54,000 54,146.11 54,146.11 54,220.75 54,220.75 54,222.26 54,222.26 54,150.65 54,150.65 54,073.30 54,073.30 54,061.59 54,061.59 54,125.06 54,125.06 54,203.77 54,203.77
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 93,000 93,000 93,251.63 93,251.63 93,380.18 93,380.18 93,382.78 93,382.78 93,259.45 93,259.45 93,126.23 93,126.23 93,106.07 93,106.07 93,215.37 93,215.37 93,350.94 93,350.94
110 Marmer Nama Jembatan Buah 586,000 586,000 587,585.51 587,585.51 588,395.55 588,395.55 588,411.93 588,411.93 587,634.79 587,634.79 586,795.40 586,795.40 586,668.38 586,668.38 587,357.08 587,357.08 588,211.30 588,211.30
111 Mata Kucing Buah 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
112 Matras Concrete (Tebal=10 cm) M2 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62
113 Mini Pile 16×16×16 M' 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
114 Mini Timber Pile Buah 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
115 Multipleks 12 mm Lbr 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93 156,361.27 156,361.27 156,588.67 156,588.67
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 93,000 93,000 93,251.63 93,251.63 93,380.18 93,380.18 93,382.78 93,382.78 93,259.45 93,259.45 93,126.23 93,126.23 93,106.07 93,106.07 93,215.37 93,215.37 93,350.94 93,350.94
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,893,000 64,893,000 65,068,577.96 65,068,577.96 65,158,280.75 65,158,280.75 65,160,094.60 65,160,094.60 65,074,034.52 65,074,034.52 64,981,081.91 64,981,081.91 64,967,015.17 64,967,015.17 65,043,281.77 65,043,281.77 65,137,876.80 65,137,876.80
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 91,931,000 91,931,000 92,179,733.41 92,179,733.41 92,306,811.33 92,306,811.33 92,309,380.92 92,309,380.92 92,187,463.47 92,187,463.47 92,055,781.69 92,055,781.69 92,035,853.96 92,035,853.96 92,143,897.43 92,143,897.43 92,277,905.97 92,277,905.97
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 175,707,000 175,707,000 176,182,402.22 176,182,402.22 176,425,285.25 176,425,285.25 176,430,196.49 176,430,196.49 176,197,176.62 176,197,176.62 175,945,494.27 175,945,494.27 175,907,406.56 175,907,406.56 176,113,909.20 176,113,909.20 176,370,038.66 176,370,038.66
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 230,412,000 230,412,000 231,035,414.99 231,035,414.99 231,353,917.75 231,353,917.75 231,360,358.06 231,360,358.06 231,054,789.28 231,054,789.28 230,724,747.59 230,724,747.59 230,674,801.57 230,674,801.57 230,945,597.20 230,945,597.20 231,281,470.55 231,281,470.55
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 293,714,000 293,714,000 294,508,688.25 294,508,688.25 294,914,694.54 294,914,694.54 294,922,904.23 294,922,904.23 294,533,385.32 294,533,385.32 294,112,669.97 294,112,669.97 294,049,002.09 294,049,002.09 294,394,194.46 294,394,194.46 294,822,343.64 294,822,343.64
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 354,365,000 354,365,000 355,323,788.83 355,323,788.83 355,813,634.11 355,813,634.11 355,823,539.08 355,823,539.08 355,353,585.76 355,353,585.76 354,845,994.04 354,845,994.04 354,769,178.95 354,769,178.95 355,185,652.44 355,185,652.44 355,702,213.05 355,702,213.05
124 Pelat Rambu (Eng. Grade) Buah 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82 205,474.75 205,474.75 205,773.58 205,773.58
125 Pelat Rambu (High L Grade) Buah 239,000 239,000 239,646.65 239,646.65 239,977.03 239,977.03 239,983.71 239,983.71 239,666.75 239,666.75 239,324.40 239,324.40 239,272.60 239,272.60 239,553.49 239,553.49 239,901.88 239,901.88
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
128 Pipa Drainase Baja Dia 3" M' 713,000 713,000 714,929.13 714,929.13 715,914.72 715,914.72 715,934.65 715,934.65 714,989.08 714,989.08 713,967.78 713,967.78 713,813.23 713,813.23 714,651.19 714,651.19 715,690.54 715,690.54
129 Pipa Galvanis Dia 1,5" M' 334,000 334,000 334,903.69 334,903.69 335,365.38 335,365.38 335,374.72 335,374.72 334,931.77 334,931.77 334,453.35 334,453.35 334,380.95 334,380.95 334,773.49 334,773.49 335,260.36 335,260.36
130 Pipa Galvanis Dia 2" M' 475,000 475,000 476,285.19 476,285.19 476,941.79 476,941.79 476,955.06 476,955.06 476,325.13 476,325.13 475,644.74 475,644.74 475,541.77 475,541.77 476,100.02 476,100.02 476,792.43 476,792.43
131 Pipa Galvanis Dia 3" M' 235,000 235,000 235,635.83 235,635.83 235,960.67 235,960.67 235,967.24 235,967.24 235,655.59 235,655.59 235,318.98 235,318.98 235,268.03 235,268.03 235,544.22 235,544.22 235,886.78 235,886.78
132 Pipa Porus M' 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
133 Pipa PVC Dia 4" M' 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
134 Plastik Filter M2 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
135 Rel Pengaman M' 166,000 166,000 166,449.14 166,449.14 166,678.60 166,678.60 166,683.24 166,683.24 166,463.10 166,463.10 166,225.32 166,225.32 166,189.34 166,189.34 166,384.43 166,384.43 166,626.41 166,626.41
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,005,000 2,005,000 2,010,424.83 2,010,424.83 2,013,196.38 2,013,196.38 2,013,252.43 2,013,252.43 2,010,593.43 2,010,593.43 2,007,721.47 2,007,721.47 2,007,286.85 2,007,286.85 2,009,643.26 2,009,643.26 2,012,565.96 2,012,565.96
137 Strip Bearing Buah 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
138 Tiang Pancang Baja Diameter 400 M' 710,000 710,000 711,921.01 711,921.01 712,902.46 712,902.46 712,922.31 712,922.31 711,980.71 711,980.71 710,963.71 710,963.71 710,809.81 710,809.81 711,644.25 711,644.25 712,679.22 712,679.22
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 868,000 868,000 870,348.51 870,348.51 871,548.36 871,548.36 871,572.62 871,572.62 870,421.49 870,421.49 869,178.17 869,178.17 868,990.02 868,990.02 870,010.15 870,010.15 871,275.44 871,275.44
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,816,000 1,816,000 1,820,913.47 1,820,913.47 1,823,423.76 1,823,423.76 1,823,474.52 1,823,474.52 1,821,066.17 1,821,066.17 1,818,464.93 1,818,464.93 1,818,071.28 1,818,071.28 1,820,205.56 1,820,205.56 1,822,852.76 1,822,852.76
HARGA SATUAN DASAR UPAH KABUPATEN NGANJUK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 117,302.82
2 Tukang OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64
3 Mandor OH 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 151,390.81
4 Operator OH 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 312,807.51
5 Pembantu Operator OH 195,812.20 195,812.20 195,614.31 195,614.31 195,329.75 195,329.75 195,222.39 195,222.39 195,387.74 195,387.74 195,668.23 195,668.23 195,803.19 195,803.19 195,504.69 195,504.69
6 Sopir OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87
7 Pembantu Sopir OH 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 127,328.70
8 Mekanik OH 176,733.07 176,733.07 176,554.45 176,554.45 176,297.62 176,297.62 176,200.72 176,200.72 176,349.96 176,349.96 176,603.12 176,603.12 176,724.93 176,724.93 176,455.52 176,455.52
9 Pembantu Mekanik OH 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 127,328.70
10 Kepala Tukang OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87
11 Pemasak Aspal OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87

HARGA SATUAN DASAR ALAT KABUPATEN NGANJUK TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 461,681.19 515,136.72 461,214.59 514,616.10 460,543.68 513,867.50 460,290.54 513,585.05 460,680.41 514,020.07 461,341.73 514,757.95 461,659.94 515,113.01 460,956.16 936,863.15
2 Asphalt Distribution Unit/Jam 284,262.31 365,516.11 283,975.01 365,146.70 283,561.92 364,615.53 283,406.07 364,415.13 283,646.11 364,723.79 284,053.29 365,247.36 284,249.22 365,499.29 283,815.89 625,101.91
3 Asphalt Finisher Unit/Jam 208,785.76 208,866.35 208,574.75 208,655.26 208,271.34 208,351.73 208,156.87 208,237.21 208,333.18 208,413.59 208,632.25 208,712.77 208,776.15 208,856.74 208,457.88 399,621.24
4 Asphalt Liquid Mixer Unit/Jam 74,496.33 136,566.46 74,421.04 136,428.44 74,312.78 136,229.98 74,271.93 136,155.10 74,334.84 136,270.43 74,441.55 136,466.05 74,492.90 136,560.17 74,379.34 204,531.80
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 99,981.91 100,416.52 99,880.87 100,315.03 99,735.57 100,169.10 99,680.75 100,114.05 99,765.19 100,198.84 99,908.40 100,342.68 99,977.31 100,411.89 99,824.90 191,763.30
6 Asphalt Mixing Plant Unit/Jam 1,117,444.93 5,731,903.38 1,116,315.58 5,726,110.39 1,114,691.70 5,717,780.75 1,114,079.02 5,714,638.04 1,115,022.66 5,719,478.41 1,116,623.29 5,727,688.80 1,117,393.49 5,731,639.53 1,115,690.06 6,745,599.00
7 Asphalt Sprayer Unit/Jam 92,140.20 92,383.19 92,047.07 92,289.83 91,913.18 92,155.57 91,862.66 92,104.92 91,940.46 92,182.94 92,072.45 92,315.27 92,135.95 92,378.94 91,995.50 176,565.78
8 Asphalt Tanker Unit/Jam 431,294.53 500,074.25 430,858.64 499,568.84 430,231.88 498,842.13 429,995.41 498,567.95 430,359.62 498,990.24 430,977.41 499,706.55 431,274.68 500,051.23 430,617.22 894,014.14
9 Blending Equipment Unit/Jam 140,170.72 221,920.50 140,029.06 221,696.21 139,825.36 221,373.72 139,748.51 221,252.04 139,866.88 221,439.44 140,067.66 221,757.32 140,164.27 221,910.28 139,950.59 349,857.69
10 Bore Pile Machine Unit/Jam 386,204.65 671,786.49 385,814.33 671,107.54 385,253.10 670,131.30 385,041.35 669,762.97 385,367.48 670,330.26 385,920.68 671,292.53 386,186.87 671,755.56 385,598.14 1,024,189.99
11 Bore Pile Machine Dia 60 Unit/Jam 252,895.43 764,169.68 252,639.84 763,397.37 252,272.33 762,286.87 252,133.67 761,867.89 252,347.23 762,513.20 252,709.48 763,607.80 252,883.79 764,134.50 252,498.28 994,422.13
12 Bore Pile Machine Dia 80 Unit/Jam 999,819.15 1,000,148.49 998,808.67 999,137.68 997,355.73 997,684.26 996,807.54 997,135.89 997,651.85 997,980.48 999,084.00 999,413.10 999,773.12 1,000,102.45 998,249.00 1,913,622.68
13 Bulldozer 100-150 HP Unit/Jam 392,085.94 392,085.94 391,689.68 391,689.68 391,119.89 391,119.89 390,904.92 390,904.92 391,236.02 391,236.02 391,797.65 391,797.65 392,067.89 392,067.89 391,470.20 750,311.32
14 Cement Tanker Unit/Jam 364,639.92 470,953.46 364,271.40 470,477.48 363,741.50 469,793.09 363,541.57 469,534.87 363,849.50 469,932.58 364,371.81 470,607.17 364,623.14 470,931.78 364,067.28 803,936.10
15 Cold Milling Unit/Jam 569,504.83 1,212,027.34 568,929.25 1,210,802.39 568,101.65 1,209,041.07 567,789.40 1,208,376.53 568,270.32 1,209,400.04 569,086.08 1,211,136.15 569,478.61 1,211,971.54 568,610.46 1,731,340.66
16 Cold Recycler Unit/Jam 4,796,191.27 4,796,191.27 4,791,343.96 4,791,343.96 4,784,374.10 4,784,374.10 4,781,744.42 4,781,744.42 4,785,794.62 4,785,794.62 4,792,664.70 4,792,664.70 4,795,970.49 4,795,970.49 4,788,659.17 9,178,183.18
17 Compressor 4000-6500 L\M Unit/Jam 146,052.01 146,052.01 145,904.40 145,904.40 145,692.16 145,692.16 145,612.08 145,612.08 145,735.42 145,735.42 145,944.62 145,944.62 146,045.29 146,045.29 145,822.65 279,490.97
18 Concrete Breaker Unit/Jam 532,256.66 1,014,206.80 531,718.73 1,013,181.79 530,945.26 1,011,707.93 530,653.43 1,011,151.86 531,102.90 1,012,008.32 531,865.30 1,013,461.07 532,232.16 1,014,160.12 531,420.79 1,499,740.88
19 Concrete Mixer (350) Unit/Jam 99,001.70 99,412.35 98,901.64 99,311.88 98,757.77 99,167.41 98,703.49 99,112.91 98,787.10 99,196.86 98,928.91 99,339.25 98,997.14 99,407.77 98,846.22 189,863.61
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 112,724.71 112,724.71 112,610.78 112,610.78 112,446.97 112,446.97 112,385.16 112,385.16 112,480.36 112,480.36 112,641.82 112,641.82 112,719.52 112,719.52 112,547.68 215,714.50
21 Concrete Pan Mixer Unit/Jam 299,945.74 641,661.53 299,642.60 641,013.03 299,206.72 640,080.56 299,042.26 639,728.75 299,295.56 640,270.61 299,725.20 641,189.73 299,931.94 641,631.99 299,474.70 915,167.30
22 Concrete Pump Unit/Jam 228,390.06 245,016.30 228,159.24 244,768.67 227,827.34 244,412.61 227,702.12 244,278.27 227,894.98 244,485.18 228,222.13 244,836.14 228,379.55 245,005.02 228,031.39 453,656.47
23 Concrete Vibrator Unit/Jam 85,278.69 85,354.04 85,192.50 85,267.77 85,068.58 85,143.74 85,021.82 85,096.94 85,093.83 85,169.02 85,215.99 85,291.28 85,274.77 85,350.11 85,144.77 163,267.94
24 Crane 10-15 Ton Unit/Jam 305,827.03 306,270.37 305,517.95 305,960.84 305,073.52 305,515.76 304,905.84 305,347.84 305,164.10 305,606.47 305,602.16 306,045.17 305,812.96 306,256.27 305,346.75 585,685.47
25 Crane On Track 35 Ton Unit/Jam 253,875.65 481,999.27 253,619.06 481,512.14 253,250.13 480,811.69 253,110.94 480,547.42 253,325.32 480,954.45 253,688.98 481,644.87 253,863.96 481,977.08 253,476.95 713,591.95
26 Crane On Track 75-100 Ton Unit/Jam 398,947.44 398,947.44 398,544.24 398,544.24 397,964.49 397,964.49 397,745.76 397,745.76 398,082.65 398,082.65 398,654.10 398,654.10 398,929.08 398,929.08 398,320.92 763,441.76
27 Dump Truck 10 Ton Unit/Jam 377,382.72 377,382.72 377,001.31 377,001.31 376,452.90 376,452.90 376,245.98 376,245.98 376,564.67 376,564.67 377,105.23 377,105.23 377,365.35 377,365.35 376,790.06 722,174.64
28 Dump Truck 3-4 M3 Unit/Jam 205,845.12 269,116.26 205,637.08 268,844.28 205,337.94 268,453.19 205,225.08 268,305.64 205,398.91 268,532.90 205,693.76 268,918.38 205,835.64 269,103.87 205,521.85 457,085.22
29 Excavator 80-140 HP Unit/Jam 297,985.31 472,961.79 297,684.15 472,483.78 297,251.12 471,796.47 297,087.74 471,537.15 297,339.38 471,936.55 297,766.21 472,614.02 297,971.60 472,940.01 297,517.35 744,938.28
30 Flat Bed Truck 3-4 M3 Unit/Jam 361,699.28 483,003.44 361,333.73 482,515.29 360,808.10 481,813.38 360,609.79 481,548.56 360,915.23 481,956.44 361,433.33 482,648.29 361,682.63 482,981.20 361,131.26 813,275.85
31 Fulvi Mixer Unit/Jam 905,718.52 1,414,868.70 904,803.15 1,413,438.75 903,486.96 1,411,382.65 902,990.36 1,410,606.90 903,755.21 1,411,801.70 905,052.56 1,413,828.37 905,676.83 1,414,803.57 904,296.15 2,241,569.73
32 Generator Set Unit/Jam 402,868.30 427,774.35 402,461.14 427,342.02 401,875.69 426,720.38 401,654.80 426,485.83 401,995.01 426,847.07 402,572.08 427,459.82 402,849.76 427,754.66 402,235.63 795,811.81
33 Hot Recycler Unit/Jam 2,959,268.63 8,677,995.23 2,956,277.83 8,669,224.75 2,951,977.40 8,656,613.84 2,950,354.88 8,651,855.82 2,952,853.87 8,659,184.05 2,957,092.73 8,671,614.43 2,959,132.41 8,677,595.76 2,954,621.30 11,372,720.38
34 Jack Hammer Unit/Jam 55,872.25 56,233.25 55,815.78 56,176.42 55,734.58 56,094.70 55,703.95 56,063.87 55,751.13 56,111.35 55,831.16 56,191.90 55,869.67 56,230.66 55,784.50 107,279.80
35 Launching Gantry Unit/Jam 71,103,805.07 71,103,930.16 71,031,943.44 71,032,068.41 70,928,614.98 70,928,739.77 70,889,629.84 70,889,754.56 70,949,674.24 70,949,799.06 71,051,523.47 71,051,648.47 71,100,531.99 71,100,657.08 70,992,141.29 136,067,206.33
36 Motor Grader > 100 HP Unit/Jam 279,361.23 290,203.73 279,078.89 289,910.43 278,672.92 289,488.71 278,519.75 289,329.59 278,755.66 289,574.66 279,155.82 289,990.35 279,348.37 290,190.37 278,922.51 545,422.28
37 Pedestrian Roller Unit/Jam 92,140.20 92,140.20 92,047.07 92,047.07 91,913.18 91,913.18 91,862.66 91,862.66 91,940.46 91,940.46 92,072.45 92,072.45 92,135.95 92,135.95 91,995.50 176,323.16
38 Pile Driver + Hammer Unit/Jam 104,882.99 307,274.54 104,776.99 306,963.99 104,624.57 306,517.45 104,567.07 306,348.98 104,655.64 306,608.46 104,805.87 307,048.60 104,878.16 307,260.39 104,718.28 402,781.98
39 Rock Drill Breaker Unit/Jam 101,942.34 331,374.50 101,839.32 331,039.59 101,691.17 330,558.04 101,635.28 330,376.35 101,721.37 330,656.18 101,867.39 331,130.84 101,937.65 331,359.25 101,782.25 424,152.79
40 Split Form Paver Unit/Jam 215,647.27 215,895.51 215,429.32 215,677.31 215,115.94 215,363.57 214,997.71 215,245.20 215,179.81 215,427.51 215,488.70 215,736.76 215,637.34 215,885.57 215,308.61 412,919.07
41 Stone Crusher Unit/Jam 577,346.55 577,346.55 576,763.05 576,763.05 575,924.04 575,924.04 575,607.49 575,607.49 576,095.04 576,095.04 576,922.03 576,922.03 577,319.97 577,319.97 576,439.86 1,104,833.41
42 Tamper Unit/Jam 86,258.91 86,258.91 86,171.73 86,171.73 86,046.38 86,046.38 85,999.08 85,999.08 86,071.92 86,071.92 86,195.48 86,195.48 86,254.94 86,254.94 86,123.44 165,068.49
43 Tandem Roller 6-8 T Unit/Jam 416,591.31 416,728.54 416,170.28 416,307.37 415,564.89 415,701.78 415,336.48 415,473.29 415,688.27 415,825.20 416,285.00 416,422.12 416,572.13 416,709.35 415,937.08 797,342.78
44 Three Wheel Roller 6-8 T Unit/Jam 138,210.29 138,210.29 138,070.61 138,070.61 137,869.76 137,869.76 137,793.98 137,793.98 137,910.70 137,910.70 138,108.67 138,108.67 138,203.93 138,203.93 137,993.24 264,484.74
45 Tire Roller 8-10 T Unit/Jam 247,014.14 247,014.14 246,764.50 246,764.50 246,405.53 246,405.53 246,270.10 246,270.10 246,478.69 246,478.69 246,832.52 246,832.52 247,002.77 247,002.77 246,626.22 472,696.13
46 Track Loader 75-100 HP Unit/Jam 231,330.70 299,241.21 231,096.91 298,938.78 230,760.74 298,503.93 230,633.90 298,339.86 230,829.25 298,592.55 231,160.61 299,021.19 231,320.06 299,227.44 230,967.42 510,487.54
47 Trailer 20 Ton Unit/Jam 373,461.86 373,461.86 373,084.42 373,084.42 372,541.70 372,541.70 372,336.94 372,336.94 372,652.31 372,652.31 373,187.26 373,187.26 373,444.67 373,444.67 372,875.36 714,671.53
48 Trailler 15 Ton Unit/Jam 323,470.90 323,470.90 323,143.98 323,143.98 322,673.91 322,673.91 322,496.56 322,496.56 322,769.72 322,769.72 323,233.06 323,233.06 323,456.01 323,456.01 322,962.91 619,006.84
49 Truck Mixer (agitator) Unit/Jam 406,789.16 597,478.26 406,378.04 596,874.42 405,786.89 596,006.16 405,563.85 595,678.57 405,907.37 596,183.12 406,490.06 597,038.95 406,770.44 597,450.76 406,150.33 968,837.63
50 Vibrating Rammer Unit/Jam 83,318.26 83,318.26 83,234.06 83,234.06 83,112.98 83,112.98 83,067.30 83,067.30 83,137.65 83,137.65 83,257.00 83,257.00 83,314.43 83,314.43 83,187.42 159,441.15
51 Vibratory Roller 5-8 T Unit/Jam 200,944.04 245,016.30 200,740.96 244,768.67 200,448.95 244,412.61 200,338.77 244,278.27 200,508.46 244,485.18 200,796.29 244,836.14 200,934.79 245,005.02 200,628.48 428,537.59
52 Water Pump 70-100 MM Unit/Jam 62,733.75 62,733.75 62,670.35 62,670.35 62,579.18 62,579.18 62,544.79 62,544.79 62,597.76 62,597.76 62,687.62 62,687.62 62,730.86 62,730.86 62,635.23 120,049.81
53 Water Tanker 3000-4500 L Unit/Jam 227,409.85 227,409.85 227,180.01 227,180.01 226,849.54 226,849.54 226,724.85 226,724.85 226,916.89 226,916.89 227,242.63 227,242.63 227,399.38 227,399.38 227,052.71 435,180.56
54 Welding Set Unit/Jam 127,427.93 127,427.93 127,299.14 127,299.14 127,113.97 127,113.97 127,044.10 127,044.10 127,151.71 127,151.71 127,334.23 127,334.23 127,422.06 127,422.06 127,227.81 243,851.18
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 221,528.56 294,220.39 221,304.67 293,923.03 220,982.74 293,495.47 220,861.28 293,334.15 221,048.35 293,582.61 221,365.67 294,004.05 221,518.36 294,206.85 221,180.66 496,503.57
HARGA SATUAN DASAR BAHAN KABUPATEN NGANJUK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
2 Agregat Pecah Mesin 20-30 mm M3 294,220.39 294,220.39 293,923.03 293,923.03 293,495.47 293,495.47 293,334.15 293,334.15 293,582.61 293,582.61 294,004.05 294,004.05 294,206.85 294,206.85 293,758.34 563,031.89
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 361,499.45 361,499.45 361,134.10 361,134.10 360,608.77 360,608.77 360,410.56 360,410.56 360,715.84 360,715.84 361,233.65 361,233.65 361,482.81 361,482.81 360,931.74 691,779.79
4 Bahan Agr. Base Kelas A M3 323,341.18 323,341.18 323,014.39 323,014.39 322,544.51 322,544.51 322,367.23 322,367.23 322,640.28 322,640.28 323,103.43 323,103.43 323,326.29 323,326.29 322,833.39 618,758.59
5 Bahan Agr. Base Kelas B M3 304,262.04 304,262.04 303,954.54 303,954.54 303,512.38 303,512.38 303,345.56 303,345.56 303,602.50 303,602.50 304,038.32 304,038.32 304,248.03 304,248.03 303,784.22 582,247.99
6 Bahan Agr. Base Kelas C M3 279,157.91 279,157.91 278,875.78 278,875.78 278,470.10 278,470.10 278,317.05 278,317.05 278,552.78 278,552.78 278,952.65 278,952.65 279,145.06 279,145.06 278,719.51 534,207.73
7 Bahan Agr. Base Kelas C2 M3 255,057.95 255,057.95 254,800.17 254,800.17 254,429.52 254,429.52 254,289.68 254,289.68 254,505.06 254,505.06 254,870.41 254,870.41 255,046.21 255,046.21 254,657.40 488,089.08
8 Bahan Agr. Base Kelas S M3 206,858.02 206,858.02 206,648.96 206,648.96 206,348.35 206,348.35 206,234.93 206,234.93 206,409.62 206,409.62 206,705.92 206,705.92 206,848.50 206,848.50 206,533.16 395,851.77
9 Bahan Pilihan M3 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38 205,530.58 393,930.16
10 Bahan Tanah Timbunan M3 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 224,828.43
11 Batu Belah/Kerakal M3 334,387.00 334,387.00 334,049.04 334,049.04 333,563.11 333,563.11 333,379.77 333,379.77 333,662.15 333,662.15 334,141.13 334,141.13 334,371.60 334,371.60 333,861.86 639,896.31
12 Batu Kali M3 366,520.28 366,520.28 366,149.85 366,149.85 365,617.22 365,617.22 365,416.27 365,416.27 365,725.78 365,725.78 366,250.78 366,250.78 366,503.41 366,503.41 365,944.68 701,387.85
13 Chipping M3 217,903.84 217,903.84 217,683.61 217,683.61 217,366.95 217,366.95 217,247.48 217,247.48 217,431.49 217,431.49 217,743.62 217,743.62 217,893.81 217,893.81 217,561.63 416,989.49
14 Chipping (kg) Kg 266.10 266.10 265.83 265.83 265.45 265.45 265.30 265.30 265.53 265.53 265.91 265.91 266.09 266.09 265.69 509.23
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 391,624.41 391,624.41 391,228.61 391,228.61 390,659.50 390,659.50 390,444.78 390,444.78 390,775.49 390,775.49 391,336.45 391,336.45 391,606.38 391,606.38 391,009.39 749,428.11
18 Kapur M3 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 230,593.26
19 Pasir Beton (Kasar) M3 465,932.63 465,932.63 465,461.73 465,461.73 464,784.64 464,784.64 464,529.17 464,529.17 464,922.63 464,922.63 465,590.04 465,590.04 465,911.18 465,911.18 465,200.91 891,627.29
20 Pasir Halus (untuk HRS) M3 233,970.48 233,970.48 233,734.02 233,734.02 233,394.01 233,394.01 233,265.73 233,265.73 233,463.31 233,463.31 233,798.45 233,798.45 233,959.71 233,959.71 233,603.05 447,735.26
21 Pasir Pasang (Sedang) M3 329,366.17 329,366.17 329,033.29 329,033.29 328,554.66 328,554.66 328,374.07 328,374.07 328,652.21 328,652.21 329,123.99 329,123.99 329,351.01 329,351.01 328,848.92 630,288.26
22 Pasir Urug M3 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
23 Pasir Urug (ada unsur lempung) M3 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55 156,403.76 299,771.24
24 Sirtu M3 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
26 Anti Pengelupas Liter 98,408.18 98,408.18 98,308.73 98,308.73 98,165.72 98,165.72 98,111.76 98,111.76 98,194.87 98,194.87 98,335.83 98,335.83 98,403.65 98,403.65 98,253.64 188,317.83
27 Arbocell Kg 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 578,326.76 578,326.76 577,742.27 577,742.27 576,901.84 576,901.84 576,584.76 576,584.76 577,073.13 577,073.13 577,901.53 577,901.53 578,300.14 578,300.14 577,418.54 1,106,709.19
41 Beton K-125 (fc' 10 MPa) M3 597,931.06 597,931.06 597,326.76 597,326.76 596,457.84 596,457.84 596,130.00 596,130.00 596,634.93 596,634.93 597,491.41 597,491.41 597,903.53 597,903.53 596,992.05 1,144,224.76
42 Beton K-175 (fc' 15 MPa) M3 646,941.80 646,941.80 646,287.96 646,287.96 645,347.83 645,347.83 644,993.12 644,993.12 645,539.43 645,539.43 646,466.11 646,466.11 646,912.02 646,912.02 645,925.82 1,238,013.67
43 Beton K-250 (fc' 20 MPa) M3 720,457.92 720,457.92 719,729.78 719,729.78 718,682.81 718,682.81 718,287.79 718,287.79 718,896.19 718,896.19 719,928.17 719,928.17 720,424.75 720,424.75 719,326.48 1,378,697.04
44 Beton K-300 (fc' 25 MPa) M3 749,864.36 749,864.36 749,106.50 749,106.50 748,016.80 748,016.80 747,605.66 747,605.66 748,238.89 748,238.89 749,313.00 749,313.00 749,829.84 749,829.84 748,686.75 1,434,970.39
45 Beton K-350 (fc' 30 MPa) M3 779,270.81 779,270.81 778,483.23 778,483.23 777,350.79 777,350.79 776,923.53 776,923.53 777,581.59 777,581.59 778,697.82 778,697.82 779,234.93 779,234.93 778,047.01 1,491,243.74
46 Beton K-400 (fc' 35 MPa) M3 808,677.25 808,677.25 807,859.96 807,859.96 806,684.78 806,684.78 806,241.40 806,241.40 806,924.29 806,924.29 808,082.64 808,082.64 808,640.03 808,640.03 807,407.28 1,547,517.09
47 Beton K-450 (fc' 40 MPa) M3 847,885.85 847,885.85 847,028.92 847,028.92 845,796.77 845,796.77 845,331.89 845,331.89 846,047.89 846,047.89 847,262.41 847,262.41 847,846.82 847,846.82 846,554.30 1,622,548.22
48 Beton K-500 (fc' 45 MPa) M3 882,193.37 882,193.37 881,301.77 881,301.77 880,019.76 880,019.76 879,536.07 879,536.07 880,281.05 880,281.05 881,544.70 881,544.70 882,152.76 882,152.76 880,807.94 1,688,200.46
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 63,714.28 63,714.28 63,649.89 63,649.89 63,557.30 63,557.30 63,522.36 63,522.36 63,576.17 63,576.17 63,667.43 63,667.43 63,711.35 63,711.35 63,614.22 121,926.19
51 Cat Anti Karat Kg 71,295.73 71,295.73 71,223.67 71,223.67 71,120.06 71,120.06 71,080.97 71,080.97 71,141.18 71,141.18 71,243.30 71,243.30 71,292.44 71,292.44 71,183.76 136,434.35
52 Cat Marka (Non Thermoplas) Kg 63,713.97 63,713.97 63,649.57 63,649.57 63,556.98 63,556.98 63,522.05 63,522.05 63,575.85 63,575.85 63,667.12 63,667.12 63,711.03 63,711.03 63,613.91 121,925.59
53 Cat Marka (Thermoplastic) Kg 43,521.54 43,521.54 43,477.55 43,477.55 43,414.31 43,414.31 43,390.45 43,390.45 43,427.20 43,427.20 43,489.54 43,489.54 43,519.54 43,519.54 43,453.19 83,284.56
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,279,306.40 1,279,306.40 1,278,013.46 1,278,013.46 1,276,154.37 1,276,154.37 1,275,452.94 1,275,452.94 1,276,533.27 1,276,533.27 1,278,365.75 1,278,365.75 1,279,247.51 1,279,247.51 1,277,297.34 2,448,131.83
57 Curing Compound Liter 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 597,478.26 597,478.26 596,874.42 596,874.42 596,006.16 596,006.16 595,678.57 595,678.57 596,183.12 596,183.12 597,038.95 597,038.95 597,450.76 597,450.76 596,539.96 1,143,358.27
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 695,886.45 695,886.45 695,183.15 695,183.15 694,171.88 694,171.88 693,790.34 693,790.34 694,377.99 694,377.99 695,374.77 695,374.77 695,854.42 695,854.42 694,793.61 1,331,676.11
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 882,661.17 882,661.17 881,769.10 881,769.10 880,486.41 880,486.41 880,002.46 880,002.46 880,747.83 880,747.83 882,012.16 882,012.16 882,620.54 882,620.54 881,275.01 1,689,095.67
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
64 Oxygen (Isi 6 M3) Botol 167,695.58 167,695.58 167,526.10 167,526.10 167,282.40 167,282.40 167,190.46 167,190.46 167,332.07 167,332.07 167,572.28 167,572.28 167,687.86 167,687.86 167,432.23 320,908.96
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,352,610.46 1,352,610.46 1,351,243.43 1,351,243.43 1,349,277.81 1,349,277.81 1,348,536.19 1,348,536.19 1,349,678.42 1,349,678.42 1,351,615.90 1,351,615.90 1,352,548.19 1,352,548.19 1,350,486.27 2,588,409.40
67 Seal Coat M2 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 205,612.33
68 Seal Guard Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
69 Semen/PC (50 kg) Zak 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
81 Baja Tulangan (Ulir) D19 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
82 Baja Tulangan (Ulir) D24 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,742,855.76 12,742,855.76 12,729,977.09 12,729,977.09 12,711,459.10 12,711,459.10 12,704,472.39 12,704,472.39 12,715,233.23 12,715,233.23 12,733,486.13 12,733,486.13 12,742,269.18 12,742,269.18 12,722,843.96 24,385,237.77
87 Box Culvert Type DUB 200×200 M' 13,527,108.75 13,527,108.75 13,513,437.47 13,513,437.47 13,493,779.79 13,493,779.79 13,486,363.09 13,486,363.09 13,497,786.20 13,497,786.20 13,517,162.46 13,517,162.46 13,526,486.06 13,526,486.06 13,505,865.33 25,886,015.60
88 Box Culvert Type uk 300×200 M' 14,605,582.12 14,605,582.12 14,590,820.87 14,590,820.87 14,569,595.95 14,569,595.95 14,561,587.94 14,561,587.94 14,573,921.78 14,573,921.78 14,594,842.85 14,594,842.85 14,604,909.79 14,604,909.79 14,582,645.03 27,949,825.32
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 363,184.39
91 Ducting (Strand Prestress) M' 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,132,846.78 2,132,846.78 2,130,691.20 2,130,691.20 2,127,591.74 2,127,591.74 2,126,422.33 2,126,422.33 2,128,223.44 2,128,223.44 2,131,278.53 2,131,278.53 2,132,748.60 2,132,748.60 2,129,497.29 4,081,500.79
94 Expansion Join Tipe Rubber M' 1,544,406.00 1,544,406.00 1,542,845.14 1,542,845.14 1,540,600.80 1,540,600.80 1,539,754.02 1,539,754.02 1,541,058.21 1,541,058.21 1,543,270.42 1,543,270.42 1,544,334.91 1,544,334.91 1,541,980.62 2,955,437.01
95 Expansion Join Tipe Torma M' 1,771,347.33 1,771,347.33 1,769,557.10 1,769,557.10 1,766,982.97 1,766,982.97 1,766,011.76 1,766,011.76 1,767,507.60 1,767,507.60 1,770,044.88 1,770,044.88 1,771,265.79 1,771,265.79 1,768,565.54 3,389,720.99
96 Expansion Tipe Joint Asphaltic Plug M' 2,100,713.50 2,100,713.50 2,098,590.39 2,098,590.39 2,095,537.62 2,095,537.62 2,094,385.83 2,094,385.83 2,096,159.81 2,096,159.81 2,099,168.87 2,099,168.87 2,100,616.79 2,100,616.79 2,097,414.47 4,020,009.25
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
99 Glass Bead Kg 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
100 Joint Sealent Kg 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
101 Joint Socket Pile 16×16×16 Set 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
102 Joint Socket Pile 35×35 Set 766,178.01 766,178.01 765,403.67 765,403.67 764,290.25 764,290.25 763,870.17 763,870.17 764,517.18 764,517.18 765,614.65 765,614.65 766,142.74 766,142.74 764,974.78 1,466,188.84
103 Kawat Beton Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
104 Kawat Bronjong Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
105 Kawat Las Dos 176,733.07 176,733.07 176,554.45 176,554.45 176,297.62 176,297.62 176,200.72 176,200.72 176,349.96 176,349.96 176,603.12 176,603.12 176,724.93 176,724.93 176,455.52 338,203.46
106 Kayu Acuan (Kelas III/Meranti) M3 4,214,481.14 4,214,481.14 4,210,221.74 4,210,221.74 4,204,097.23 4,204,097.23 4,201,786.49 4,201,786.49 4,205,345.46 4,205,345.46 4,211,382.29 4,211,382.29 4,214,287.14 4,214,287.14 4,207,862.58 8,064,999.44
107 Kayu Perancah (Gelam) M3 2,715,262.57 2,715,262.57 2,712,518.37 2,712,518.37 2,708,572.53 2,708,572.53 2,707,083.79 2,707,083.79 2,709,376.73 2,709,376.73 2,713,266.07 2,713,266.07 2,715,137.58 2,715,137.58 2,710,998.43 5,196,034.90
108 Kerb Pracetak Type 1 (Peninggi) Buah 54,224.92 54,224.92 54,170.12 54,170.12 54,091.32 54,091.32 54,061.58 54,061.58 54,107.38 54,107.38 54,185.05 54,185.05 54,222.42 54,222.42 54,139.76 103,766.97
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 93,387.36 93,387.36 93,292.98 93,292.98 93,157.27 93,157.27 93,106.06 93,106.06 93,184.92 93,184.92 93,318.69 93,318.69 93,383.06 93,383.06 93,240.70 178,709.78
110 Marmer Nama Jembatan Buah 588,440.78 588,440.78 587,846.07 587,846.07 586,990.94 586,990.94 586,668.31 586,668.31 587,165.22 587,165.22 588,008.11 588,008.11 588,413.69 588,413.69 587,516.67 1,126,063.78
111 Mata Kucing Buah 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 295,928.02
112 Matras Concrete (Tebal=10 cm) M2 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 274,790.31
113 Mini Pile 16×16×16 M' 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 255,574.20
114 Mini Timber Pile Buah 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
115 Multipleks 12 mm Lbr 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55 156,403.76 299,771.24
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 93,387.36 93,387.36 93,292.98 93,292.98 93,157.27 93,157.27 93,106.06 93,106.06 93,184.92 93,184.92 93,318.69 93,318.69 93,383.06 93,383.06 93,240.70 178,709.78
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 65,163,289.13 65,163,289.13 65,097,431.33 65,097,431.33 65,002,735.67 65,002,735.67 64,967,007.62 64,967,007.62 65,022,035.48 65,022,035.48 65,115,375.51 65,115,375.51 65,160,289.51 65,160,289.51 65,060,954.53 124,699,072.86
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 92,313,906.48 92,313,906.48 92,220,608.69 92,220,608.69 92,086,457.59 92,086,457.59 92,035,843.28 92,035,843.28 92,113,798.78 92,113,798.78 92,246,029.40 92,246,029.40 92,309,657.05 92,309,657.05 92,168,933.65 176,655,578.68
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 176,438,846.15 176,438,846.15 176,260,526.82 176,260,526.82 176,004,124.88 176,004,124.88 175,907,386.14 175,907,386.14 176,056,381.87 176,056,381.87 176,309,113.22 176,309,113.22 176,430,724.25 176,430,724.25 176,161,760.72 337,640,423.39
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 231,371,700.73 231,371,700.73 231,137,863.07 231,137,863.07 230,801,632.39 230,801,632.39 230,674,774.80 230,674,774.80 230,870,159.19 230,870,159.19 231,201,576.47 231,201,576.47 231,361,050.13 231,361,050.13 231,008,346.91 442,762,128.05
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 294,937,363.10 294,937,363.10 294,639,282.30 294,639,282.30 294,210,677.64 294,210,677.64 294,048,967.96 294,048,967.96 294,298,031.07 294,298,031.07 294,720,499.93 294,720,499.93 294,923,786.43 294,923,786.43 294,474,183.66 564,403,918.54
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 355,840,983.66 355,840,983.66 355,481,350.13 355,481,350.13 354,964,239.98 354,964,239.98 354,769,137.77 354,769,137.77 355,069,631.62 355,069,631.62 355,579,338.94 355,579,338.94 355,824,603.45 355,824,603.45 355,282,159.15 680,951,519.49
124 Pelat Rambu (Eng. Grade) Buah 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38 205,530.58 393,930.16
125 Pelat Rambu (High L Grade) Buah 239,995.47 239,995.47 239,752.92 239,752.92 239,404.15 239,404.15 239,272.57 239,272.57 239,475.24 239,475.24 239,819.01 239,819.01 239,984.42 239,984.42 239,618.57 459,264.92
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
128 Pipa Drainase Baja Dia 3" M' 715,969.75 715,969.75 715,246.15 715,246.15 714,205.70 714,205.70 713,813.15 713,813.15 714,417.75 714,417.75 715,443.31 715,443.31 715,936.79 715,936.79 714,845.37 1,370,108.32
129 Pipa Galvanis Dia 1,5" M' 335,391.16 335,391.16 335,052.19 335,052.19 334,564.80 334,564.80 334,380.91 334,380.91 334,664.14 334,664.14 335,144.55 335,144.55 335,375.72 335,375.72 334,864.45 641,817.92
130 Pipa Galvanis Dia 2" M' 476,978.45 476,978.45 476,496.38 476,496.38 475,803.24 475,803.24 475,541.72 475,541.72 475,944.51 475,944.51 476,627.73 476,627.73 476,956.49 476,956.49 476,229.38 912,765.01
131 Pipa Galvanis Dia 3" M' 235,978.81 235,978.81 235,740.32 235,740.32 235,397.39 235,397.39 235,268.01 235,268.01 235,467.28 235,467.28 235,805.30 235,805.30 235,967.95 235,967.95 235,608.22 451,578.48
132 Pipa Porus M' 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
133 Pipa PVC Dia 4" M' 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
134 Plastik Filter M2 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
135 Rel Pengaman M' 166,691.42 166,691.42 166,522.95 166,522.95 166,280.71 166,280.71 166,189.32 166,189.32 166,330.08 166,330.08 166,568.85 166,568.85 166,683.74 166,683.74 166,429.64 318,987.35
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,013,351.13 2,013,351.13 2,011,316.32 2,011,316.32 2,008,390.50 2,008,390.50 2,007,286.61 2,007,286.61 2,008,986.81 2,008,986.81 2,011,870.74 2,011,870.74 2,013,258.45 2,013,258.45 2,010,189.29 3,852,829.14
137 Strip Bearing Buah 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
138 Tiang Pancang Baja Diameter 400 M' 712,957.26 712,957.26 712,236.70 712,236.70 711,200.63 711,200.63 710,809.72 710,809.72 711,411.79 711,411.79 712,433.03 712,433.03 712,924.44 712,924.44 711,837.61 1,364,343.48
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 871,615.35 871,615.35 870,734.45 870,734.45 869,467.81 869,467.81 868,989.92 868,989.92 869,725.96 869,725.96 870,974.46 870,974.46 871,575.23 871,575.23 870,246.54 1,667,957.95
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,823,563.91 1,823,563.91 1,821,720.91 1,821,720.91 1,819,070.90 1,819,070.90 1,818,071.07 1,818,071.07 1,819,611.00 1,819,611.00 1,822,223.07 1,822,223.07 1,823,479.97 1,823,479.97 1,820,700.13 3,489,644.74
HARGA SATUAN DASAR UPAH KABUPATEN BOJONEGORO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 126,200 126,200 126,541.45 126,541.45 126,715.90 126,715.90 126,719.43 126,719.43 126,552.07 126,552.07 126,371.30 126,371.30 126,343.94 126,343.94 126,492.26 126,492.26 126,676.22 126,676.22
2 Tukang OH 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
3 Mandor OH 163,100 163,100 163,541.29 163,541.29 163,766.75 163,766.75 163,771.31 163,771.31 163,555.01 163,555.01 163,321.38 163,321.38 163,286.03 163,286.03 163,477.71 163,477.71 163,715.47 163,715.47
4 Operator OH 336,600 336,600 337,510.72 337,510.72 337,976.01 337,976.01 337,985.42 337,985.42 337,539.03 337,539.03 337,056.88 337,056.88 336,983.92 336,983.92 337,379.51 337,379.51 337,870.18 337,870.18
5 Pembantu Operator OH 210,400 210,400 210,969.27 210,969.27 211,260.11 211,260.11 211,265.99 211,265.99 210,986.96 210,986.96 210,685.58 210,685.58 210,639.98 210,639.98 210,887.25 210,887.25 211,193.95 211,193.95
6 Sopir OH 157,800 157,800 158,226.95 158,226.95 158,445.08 158,445.08 158,449.49 158,449.49 158,240.22 158,240.22 158,014.19 158,014.19 157,979.98 157,979.98 158,165.44 158,165.44 158,395.47 158,395.47
7 Pembantu Sopir OH 136,800 136,800 137,170.13 137,170.13 137,359.23 137,359.23 137,363.06 137,363.06 137,181.64 137,181.64 136,985.68 136,985.68 136,956.03 136,956.03 137,116.81 137,116.81 137,316.22 137,316.22
8 Mekanik OH 189,400 189,400 189,912.45 189,912.45 190,174.26 190,174.26 190,179.56 190,179.56 189,928.38 189,928.38 189,657.08 189,657.08 189,616.02 189,616.02 189,838.62 189,838.62 190,114.71 190,114.71
9 Pembantu Mekanik OH 136,800 136,800 137,170.13 137,170.13 137,359.23 137,359.23 137,363.06 137,363.06 137,181.64 137,181.64 136,985.68 136,985.68 136,956.03 136,956.03 137,116.81 137,116.81 137,316.22 137,316.22
10 Kepala Tukang OH 157,800 157,800 158,226.95 158,226.95 158,445.08 158,445.08 158,449.49 158,449.49 158,240.22 158,240.22 158,014.19 158,014.19 157,979.98 157,979.98 158,165.44 158,165.44 158,395.47 158,395.47
11 Pemasak Aspal OH 157,800 157,800 158,226.95 158,226.95 158,445.08 158,445.08 158,449.49 158,449.49 158,240.22 158,240.22 158,014.19 158,014.19 157,979.98 157,979.98 158,165.44 158,165.44 158,395.47 158,395.47

HARGA SATUAN DASAR ALAT KABUPATEN BOJONEGORO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 495,493 553,400 496,833.21 554,897.31 497,518.14 555,662.28 497,531.99 555,677.75 496,874.87 554,943.84 496,165.13 554,151.15 496,057.72 554,031.19 496,640.06 554,681.59 497,362.34 555,488.28
2 Asphalt Distribution Unit/Jam 305,080 392,400 305,905.80 393,461.70 306,327.52 394,004.12 306,336.04 394,015.09 305,931.45 393,494.69 305,494.45 392,932.62 305,428.32 392,847.56 305,786.87 393,308.74 306,231.59 393,880.74
3 Asphalt Finisher Unit/Jam 224,076 1,062,500 224,682.53 1,065,374.76 224,992.28 1,066,843.47 224,998.54 1,066,873.17 224,701.38 1,065,464.10 224,380.41 1,063,942.17 224,331.84 1,063,711.86 224,595.19 1,064,960.58 224,921.82 1,066,509.39
4 Asphalt Liquid Mixer Unit/Jam 79,952 146,200 80,168.42 146,595.57 80,278.94 146,797.66 80,281.17 146,801.75 80,175.14 146,607.86 80,060.62 146,398.44 80,043.28 146,366.75 80,137.25 146,538.58 80,253.80 146,751.69
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 107,304 107,304 107,594.45 107,594.45 107,742.78 107,742.78 107,745.78 107,745.78 107,603.48 107,603.48 107,449.77 107,449.77 107,426.51 107,426.51 107,552.62 107,552.62 107,709.04 107,709.04
6 Asphalt Mixing Plant Unit/Jam 1,199,281 5,851,722 1,202,526.24 5,867,554.73 1,204,184.03 5,875,643.67 1,204,217.55 5,875,807.24 1,202,627.08 5,868,046.78 1,200,909.23 5,859,664.78 1,200,649.27 5,858,396.31 1,202,058.74 5,865,273.65 1,203,806.95 5,873,803.75
7 Asphalt Sprayer Unit/Jam 98,888 98,888 99,155.67 99,155.67 99,292.37 99,292.37 99,295.13 99,295.13 99,163.99 99,163.99 99,022.34 99,022.34 99,000.90 99,000.90 99,117.12 99,117.12 99,261.27 99,261.27
8 Asphalt Tanker Unit/Jam 462,881 536,500 464,132.93 537,951.58 464,772.78 538,693.20 464,785.72 538,708.19 464,171.86 537,996.69 463,508.83 537,228.21 463,408.49 537,111.92 463,952.50 537,742.45 464,627.24 538,524.51
9 Blending Equipment Unit/Jam 150,436 237,800 150,843.20 238,443.40 151,051.15 238,772.12 151,055.36 238,778.77 150,855.85 238,463.40 150,640.37 238,122.78 150,607.76 238,071.23 150,784.56 238,350.71 151,003.85 238,697.35
10 Bore Pile Machine Unit/Jam 414,488 720,600 415,609.95 722,549.69 416,182.90 723,545.79 416,194.49 723,565.93 415,644.80 722,610.29 415,051.09 721,578.10 414,961.24 721,421.90 415,448.37 722,268.79 416,052.58 723,319.22
11 Bore Pile Machine Dia 60 Unit/Jam 271,416 820,600 272,150.68 822,820.26 272,525.86 823,954.59 272,533.45 823,977.53 272,173.50 822,889.26 271,784.72 821,713.83 271,725.89 821,535.95 272,044.87 822,500.38 272,440.52 823,696.57
12 Bore Pile Machine Dia 80 Unit/Jam 1,073,041 1,073,041 1,075,944.53 1,075,944.53 1,077,427.82 1,077,427.82 1,077,457.81 1,077,457.81 1,076,034.76 1,076,034.76 1,074,497.74 1,074,497.74 1,074,265.13 1,074,265.13 1,075,526.24 1,075,526.24 1,077,090.42 1,077,090.42
13 Bulldozer 100-150 HP Unit/Jam 420,800 610,200 421,939.03 611,850.99 422,520.71 612,694.48 422,532.47 612,711.54 421,974.41 611,902.30 421,371.66 611,028.25 421,280.44 610,895.98 421,775.00 611,613.13 422,388.40 612,502.62
14 Cement Tanker Unit/Jam 391,344 505,000 392,403.30 506,366.35 392,944.26 507,064.43 392,955.20 507,078.54 392,436.21 506,408.82 391,875.64 505,685.46 391,790.81 505,575.99 392,250.75 506,169.50 392,821.21 506,905.64
15 Cold Milling Unit/Jam 611,213 1,394,122 612,866.44 1,397,894.01 613,711.33 1,399,821.13 613,728.42 1,399,860.10 612,917.84 1,398,011.24 612,042.34 1,396,014.30 611,909.85 1,395,712.10 612,628.18 1,397,350.56 613,519.15 1,399,382.79
16 Cold Recycler Unit/Jam 5,147,442 5,147,442 5,161,369.20 5,161,369.20 5,168,484.61 5,168,484.61 5,168,628.49 5,168,628.49 5,161,802.03 5,161,802.03 5,154,428.84 5,154,428.84 5,153,313.04 5,153,313.04 5,159,362.66 5,159,362.66 5,166,866.13 5,166,866.13
17 Compressor 4000-6500 L\M Unit/Jam 156,748 156,748 157,172.29 157,172.29 157,388.97 157,388.97 157,393.35 157,393.35 157,185.47 157,185.47 156,960.94 156,960.94 156,926.97 156,926.97 157,111.19 157,111.19 157,339.68 157,339.68
18 Concrete Breaker Unit/Jam 571,237 1,088,800 572,782.24 1,091,745.92 573,571.87 1,093,250.98 573,587.83 1,093,281.42 572,830.27 1,091,837.47 572,012.03 1,090,277.87 571,888.20 1,090,041.86 572,559.56 1,091,321.49 573,392.26 1,092,908.64
19 Concrete Mixer (350) Unit/Jam 106,252 106,252 106,539.61 106,539.61 106,686.48 106,686.48 106,689.45 106,689.45 106,548.54 106,548.54 106,396.34 106,396.34 106,373.31 106,373.31 106,498.19 106,498.19 106,653.07 106,653.07
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 120,980 120,980 121,307.47 121,307.47 121,474.70 121,474.70 121,478.09 121,478.09 121,317.64 121,317.64 121,144.35 121,144.35 121,118.13 121,118.13 121,260.31 121,260.31 121,436.67 121,436.67
21 Concrete Pan Mixer Unit/Jam 321,912 689,100 322,783.36 690,964.47 323,228.34 691,917.02 323,237.34 691,936.28 322,810.43 691,022.41 322,349.32 690,035.34 322,279.54 689,885.97 322,657.87 690,695.84 323,127.13 691,700.35
22 Concrete Pump Unit/Jam 245,116 263,000 245,779.49 263,711.59 246,118.31 264,075.14 246,125.17 264,082.49 245,800.10 263,733.70 245,448.99 263,356.98 245,395.86 263,299.97 245,683.94 263,609.07 246,041.24 263,992.44
23 Concrete Vibrator Unit/Jam 91,524 91,524 91,771.74 91,771.74 91,898.25 91,898.25 91,900.81 91,900.81 91,779.44 91,779.44 91,648.34 91,648.34 91,628.50 91,628.50 91,736.06 91,736.06 91,869.48 91,869.48
24 Crane 10-15 Ton Unit/Jam 328,224 382,807 329,112.44 383,842.74 329,566.16 384,371.90 329,575.33 384,382.60 329,140.04 383,874.93 328,669.90 383,326.60 328,598.75 383,243.62 328,984.50 383,693.52 329,462.95 384,251.54
25 Crane On Track 35 Ton Unit/Jam 272,468 517,600 273,205.52 519,000.45 273,582.16 519,715.93 273,589.78 519,730.40 273,228.43 519,043.97 272,838.15 518,302.56 272,779.09 518,190.36 273,099.31 518,798.68 273,496.49 519,553.19
26 Crane On Track 75-100 Ton Unit/Jam 428,164 649,100 429,322.96 650,856.24 429,914.82 651,753.50 429,926.79 651,771.65 429,358.97 650,910.82 428,745.67 649,981.05 428,652.85 649,840.35 429,156.06 650,603.21 429,780.20 651,549.41
27 Dump Truck 10 Ton Unit/Jam 405,020 435,500 406,116.32 436,678.31 406,676.19 437,280.31 406,687.51 437,292.48 406,150.37 436,714.93 405,570.22 436,091.12 405,482.43 435,996.72 405,958.44 436,508.55 406,548.84 437,143.38
28 Dump Truck 3-4 M3 Unit/Jam 220,920 258,997 221,517.99 259,697.76 221,823.37 260,055.77 221,829.55 260,063.01 221,536.57 259,719.53 221,220.12 259,348.55 221,172.23 259,292.40 221,431.87 259,596.80 221,753.91 259,974.34
29 Excavator 80-140 HP Unit/Jam 319,808 508,100 320,673.66 509,474.74 321,115.74 510,177.10 321,124.68 510,191.30 320,700.56 509,517.47 320,242.46 508,789.66 320,173.14 508,679.52 320,549.00 509,276.68 321,015.19 510,017.34
30 Flat Bed Truck 3-4 M3 Unit/Jam 388,188 518,600 389,238.76 520,003.15 389,775.36 520,720.02 389,786.21 520,734.52 389,271.40 520,046.76 388,715.36 519,303.92 388,631.21 519,191.50 389,087.44 519,800.99 389,653.30 520,556.96
31 Fulvi Mixer Unit/Jam 972,049 1,518,000 974,679.16 1,522,107.18 976,022.84 1,524,205.54 976,050.01 1,524,247.97 974,760.90 1,522,234.82 973,368.54 1,520,060.44 973,157.83 1,519,731.39 974,300.24 1,521,515.44 975,717.21 1,523,728.24
32 Generator Set Unit/Jam 432,373 547,747 433,542.35 549,229.01 434,140.03 549,986.17 434,152.12 550,001.48 433,578.71 549,275.07 432,959.38 548,490.48 432,865.66 548,371.75 433,373.81 549,015.49 434,004.08 549,813.95
33 Hot Recycler Unit/Jam 3,175,992 9,313,400 3,184,584.84 9,338,598.83 3,188,975.07 9,351,472.92 3,189,063.85 9,351,733.24 3,184,851.90 9,339,381.95 3,180,302.61 9,326,041.46 3,179,614.16 9,324,022.61 3,183,346.80 9,334,968.34 3,187,976.46 9,348,544.55
34 Jack Hammer Unit/Jam 59,964 59,964 60,126.31 60,126.31 60,209.20 60,209.20 60,210.88 60,210.88 60,131.35 60,131.35 60,045.46 60,045.46 60,032.46 60,032.46 60,102.94 60,102.94 60,190.35 60,190.35
35 Launching Gantry Unit/Jam 76,311,117 76,311,600 76,517,588.53 76,518,072.73 76,623,074.80 76,623,559.67 76,625,207.79 76,625,692.67 76,524,005.18 76,524,489.43 76,414,697.29 76,415,180.84 76,398,155.46 76,398,638.91 76,487,841.40 76,488,325.41 76,599,080.71 76,599,565.42
36 Motor Grader > 100 HP Unit/Jam 299,820 525,573 300,631.56 526,995.02 301,046.01 527,721.53 301,054.39 527,736.22 300,656.77 527,039.21 300,227.31 526,286.38 300,162.32 526,172.45 300,514.69 526,790.14 300,951.74 527,556.27
37 Pedestrian Roller Unit/Jam 98,888 98,888 99,155.67 99,155.67 99,292.37 99,292.37 99,295.13 99,295.13 99,163.99 99,163.99 99,022.34 99,022.34 99,000.90 99,000.90 99,117.12 99,117.12 99,261.27 99,261.27
38 Pile Driver + Hammer Unit/Jam 112,564 329,300 112,868.69 330,190.97 113,024.29 330,646.17 113,027.44 330,655.37 112,878.16 330,218.66 112,716.92 329,746.97 112,692.52 329,675.59 112,824.81 330,062.61 112,988.90 330,542.63
39 Rock Drill Breaker Unit/Jam 109,408 355,600 109,704.15 356,562.13 109,855.39 357,053.68 109,858.44 357,063.62 109,713.35 356,592.03 109,556.63 356,082.67 109,532.92 356,005.59 109,661.50 356,423.51 109,820.98 356,941.87
40 Split Form Paver Unit/Jam 231,440 231,440 232,066.47 232,066.47 232,386.39 232,386.39 232,392.86 232,392.86 232,085.93 232,085.93 231,754.41 231,754.41 231,704.24 231,704.24 231,976.25 231,976.25 232,313.62 232,313.62
41 Stone Crusher Unit/Jam 619,629 772,200 621,305.22 774,289.31 622,161.75 775,356.73 622,179.07 775,378.32 621,357.33 774,354.24 620,469.77 773,248.14 620,335.45 773,080.75 621,063.68 773,988.29 621,966.92 775,113.93
42 Tamper Unit/Jam 92,576 92,576 92,826.59 92,826.59 92,954.56 92,954.56 92,957.14 92,957.14 92,834.37 92,834.37 92,701.77 92,701.77 92,681.70 92,681.70 92,790.50 92,790.50 92,925.45 92,925.45
43 Tandem Roller 6-8 T Unit/Jam 447,101 521,793 448,310.22 523,204.79 448,928.26 523,926.08 448,940.75 523,940.66 448,347.82 523,248.67 447,707.39 522,501.25 447,610.47 522,388.14 448,135.94 523,001.39 448,787.68 523,762.01
44 Three Wheel Roller 6-8 T Unit/Jam 148,332 187,999 148,733.51 188,507.66 148,938.55 188,767.53 148,942.70 188,772.79 148,745.98 188,523.47 148,533.51 188,254.18 148,501.36 188,213.43 148,675.69 188,434.38 148,891.91 188,708.42
45 Tire Roller 8-10 T Unit/Jam 265,104 478,700 265,821.59 479,995.20 266,188.05 480,656.91 266,195.46 480,670.29 265,843.88 480,035.45 265,464.15 479,349.76 265,406.68 479,245.99 265,718.25 479,808.59 266,104.69 480,506.40
46 Track Loader 75-100 HP Unit/Jam 248,272 418,893 248,944.03 420,026.38 249,287.22 420,605.42 249,294.16 420,617.13 248,964.90 420,061.60 248,609.28 419,461.58 248,555.46 419,370.78 248,847.25 419,863.09 249,209.16 420,473.71
47 Trailer 20 Ton Unit/Jam 400,812 554,400 401,896.93 555,900.01 402,450.98 556,666.37 402,462.18 556,681.87 401,930.63 555,946.63 401,356.51 555,152.51 401,269.62 555,032.33 401,740.69 555,683.90 402,324.95 556,492.05
48 Trailler 15 Ton Unit/Jam 347,160 528,100 348,099.70 529,528.86 348,579.59 530,258.86 348,589.29 530,273.62 348,128.89 529,573.26 347,631.62 528,816.81 347,556.37 528,702.34 347,964.37 529,322.99 348,470.43 530,092.81
49 Truck Mixer (agitator) Unit/Jam 436,581 641,700 437,761.75 643,436.22 438,365.24 644,323.25 438,377.44 644,341.19 437,798.46 643,490.18 437,173.10 642,571.01 437,078.46 642,431.91 437,591.56 643,186.07 438,227.97 644,121.49
50 Vibrating Rammer Unit/Jam 89,420 89,420 89,662.04 89,662.04 89,785.65 89,785.65 89,788.15 89,788.15 89,669.56 89,669.56 89,541.48 89,541.48 89,522.09 89,522.09 89,627.19 89,627.19 89,757.54 89,757.54
51 Vibratory Roller 5-8 T Unit/Jam 215,660 462,900 216,243.75 464,152.45 216,541.86 464,792.32 216,547.89 464,805.26 216,261.89 464,191.37 215,952.98 463,528.31 215,906.23 463,427.97 216,159.69 463,972.00 216,474.06 464,646.77
52 Water Pump 70-100 MM Unit/Jam 67,328 67,328 67,510.25 67,510.25 67,603.31 67,603.31 67,605.20 67,605.20 67,515.91 67,515.91 67,419.47 67,419.47 67,404.87 67,404.87 67,484.00 67,484.00 67,582.14 67,582.14
53 Water Tanker 3000-4500 L Unit/Jam 244,064 244,064 244,724.64 244,724.64 245,062.01 245,062.01 245,068.83 245,068.83 244,745.16 244,745.16 244,395.56 244,395.56 244,342.66 244,342.66 244,629.50 244,629.50 244,985.27 244,985.27
54 Welding Set Unit/Jam 136,760 136,760 137,130.19 137,130.19 137,319.23 137,319.23 137,323.05 137,323.05 137,141.68 137,141.68 136,945.79 136,945.79 136,916.14 136,916.14 137,076.87 137,076.87 137,276.23 137,276.23
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 237,752 430,749 238,395.55 431,914.46 238,724.20 432,509.89 238,730.85 432,521.93 238,415.54 431,950.68 238,074.99 431,333.67 238,023.45 431,240.30 238,302.87 431,746.55 238,649.45 432,374.45
HARGA SATUAN DASAR BAHAN KABUPATEN BOJONEGORO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 331,400 331,400 332,296.65 332,296.65 332,754.75 332,754.75 332,764.02 332,764.02 332,324.52 332,324.52 331,849.82 331,849.82 331,777.99 331,777.99 332,167.47 332,167.47 332,650.55 332,650.55
2 Agregat Pecah Mesin 20-30 mm M3 315,600 315,600 316,453.90 316,453.90 316,890.16 316,890.16 316,898.99 316,898.99 316,480.44 316,480.44 316,028.38 316,028.38 315,959.96 315,959.96 316,330.88 316,330.88 316,790.93 316,790.93
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
4 Bahan Agr. Base Kelas A M3 347,200 347,200 348,139.40 348,139.40 348,619.34 348,619.34 348,629.05 348,629.05 348,168.60 348,168.60 347,671.27 347,671.27 347,596.01 347,596.01 348,004.06 348,004.06 348,510.18 348,510.18
5 Bahan Agr. Base Kelas B M3 326,100 326,100 326,982.31 326,982.31 327,433.09 327,433.09 327,442.20 327,442.20 327,009.73 327,009.73 326,542.63 326,542.63 326,471.94 326,471.94 326,855.20 326,855.20 327,330.55 327,330.55
6 Bahan Agr. Base Kelas C M3 299,800 299,800 300,611.15 300,611.15 301,025.57 301,025.57 301,033.95 301,033.95 300,636.36 300,636.36 300,206.93 300,206.93 300,141.94 300,141.94 300,494.29 300,494.29 300,931.31 300,931.31
7 Bahan Agr. Base Kelas C2 M3 273,500 273,500 274,240.00 274,240.00 274,618.06 274,618.06 274,625.70 274,625.70 274,262.99 274,262.99 273,871.23 273,871.23 273,811.95 273,811.95 274,133.38 274,133.38 274,532.07 274,532.07
8 Bahan Agr. Base Kelas S M3 221,500 221,500 222,099.30 222,099.30 222,405.49 222,405.49 222,411.68 222,411.68 222,117.93 222,117.93 221,800.65 221,800.65 221,752.64 221,752.64 222,012.96 222,012.96 222,335.84 222,335.84
9 Bahan Pilihan M3 220,900 220,900 221,497.68 221,497.68 221,803.03 221,803.03 221,809.21 221,809.21 221,516.25 221,516.25 221,199.84 221,199.84 221,151.95 221,151.95 221,411.57 221,411.57 221,733.58 221,733.58
10 Bahan Tanah Timbunan M3 126,200 126,200 126,541.45 126,541.45 126,715.90 126,715.90 126,719.43 126,719.43 126,552.07 126,552.07 126,371.30 126,371.30 126,343.94 126,343.94 126,492.26 126,492.26 126,676.22 126,676.22
11 Batu Belah/Kerakal M3 356,500 356,500 357,464.57 357,464.57 357,957.36 357,957.36 357,967.33 357,967.33 357,494.54 357,494.54 356,983.89 356,983.89 356,906.61 356,906.61 357,325.60 357,325.60 357,845.27 357,845.27
12 Batu Kali M3 392,900 392,900 393,963.05 393,963.05 394,506.16 394,506.16 394,517.15 394,517.15 393,996.09 393,996.09 393,433.30 393,433.30 393,348.13 393,348.13 393,809.89 393,809.89 394,382.63 394,382.63
13 Chipping M3 234,100 234,100 234,733.39 234,733.39 235,056.99 235,056.99 235,063.54 235,063.54 234,753.08 234,753.08 234,417.75 234,417.75 234,367.01 234,367.01 234,642.14 234,642.14 234,983.39 234,983.39
14 Chipping (kg) Kg 300 300 300.81 300.81 301.23 301.23 301.23 301.23 300.84 300.84 300.41 300.41 300.34 300.34 300.69 300.69 301.13 301.13
15 Filler Cement Kg 2,100 2,100 2,105.68 2,105.68 2,108.58 2,108.58 2,108.64 2,108.64 2,105.86 2,105.86 2,102.85 2,102.85 2,102.40 2,102.40 2,104.86 2,104.86 2,107.92 2,107.92
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 420,000 420,000 421,136.37 421,136.37 421,716.95 421,716.95 421,728.69 421,728.69 421,171.69 421,171.69 420,570.08 420,570.08 420,479.04 420,479.04 420,972.65 420,972.65 421,584.89 421,584.89
18 Kapur M3 105,200 105,200 105,484.63 105,484.63 105,630.05 105,630.05 105,633.00 105,633.00 105,493.48 105,493.48 105,342.79 105,342.79 105,319.99 105,319.99 105,443.63 105,443.63 105,596.98 105,596.98
19 Pasir Beton (Kasar) M3 499,700 499,700 501,052.01 501,052.01 501,742.76 501,742.76 501,756.73 501,756.73 501,094.03 501,094.03 500,378.26 500,378.26 500,269.94 500,269.94 500,857.22 500,857.22 501,585.64 501,585.64
20 Pasir Halus (untuk HRS) M3 280,000 280,000 280,757.58 280,757.58 281,144.63 281,144.63 281,152.46 281,152.46 280,781.13 280,781.13 280,380.06 280,380.06 280,319.36 280,319.36 280,648.44 280,648.44 281,056.59 281,056.59
21 Pasir Pasang (Sedang) M3 279,800 279,800 280,557.04 280,557.04 280,943.81 280,943.81 280,951.64 280,951.64 280,580.57 280,580.57 280,179.78 280,179.78 280,119.13 280,119.13 280,447.97 280,447.97 280,855.84 280,855.84
22 Pasir Urug M3 214,500 214,500 215,080.36 215,080.36 215,376.87 215,376.87 215,382.87 215,382.87 215,098.40 215,098.40 214,791.15 214,791.15 214,744.65 214,744.65 214,996.75 214,996.75 215,309.43 215,309.43
23 Pasir Urug (ada unsur lempung) M3 134,900 134,900 135,264.99 135,264.99 135,451.47 135,451.47 135,455.24 135,455.24 135,276.34 135,276.34 135,083.11 135,083.11 135,053.86 135,053.86 135,212.41 135,212.41 135,409.05 135,409.05
24 Sirtu M3 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 73,600 73,600 73,799.14 73,799.14 73,900.87 73,900.87 73,902.93 73,902.93 73,805.32 73,805.32 73,699.90 73,699.90 73,683.95 73,683.95 73,770.45 73,770.45 73,877.73 73,877.73
26 Anti Pengelupas Liter 105,900 105,900 106,186.53 106,186.53 106,332.92 106,332.92 106,335.88 106,335.88 106,195.43 106,195.43 106,043.74 106,043.74 106,020.79 106,020.79 106,145.25 106,145.25 106,299.62 106,299.62
27 Arbocell Kg 149,400 149,400 149,804.22 149,804.22 150,010.74 150,010.74 150,014.92 150,014.92 149,816.79 149,816.79 149,602.79 149,602.79 149,570.40 149,570.40 149,745.99 149,745.99 149,963.77 149,963.77
28 Asbuton Curah Kg 15,300 15,300 15,341.40 15,341.40 15,362.55 15,362.55 15,362.97 15,362.97 15,342.68 15,342.68 15,320.77 15,320.77 15,317.45 15,317.45 15,335.43 15,335.43 15,357.74 15,357.74
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,400 9,400 9,425.43 9,425.43 9,438.43 9,438.43 9,438.69 9,438.69 9,426.22 9,426.22 9,412.76 9,412.76 9,410.72 9,410.72 9,421.77 9,421.77 9,435.47 9,435.47
30 Aspal Emulsi (CSS-1) Kg 10,300 10,300 10,327.87 10,327.87 10,342.11 10,342.11 10,342.39 10,342.39 10,328.73 10,328.73 10,313.98 10,313.98 10,311.75 10,311.75 10,323.85 10,323.85 10,338.87 10,338.87
31 Aspal Minyak (Drum) Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
32 Aspal Modifikasi (BNA) Kg 13,400 13,400 13,436.26 13,436.26 13,454.78 13,454.78 13,455.15 13,455.15 13,437.38 13,437.38 13,418.19 13,418.19 13,415.28 13,415.28 13,431.03 13,431.03 13,450.57 13,450.57
33 Aspal Modifikasi (JAP-57) Kg 17,100 17,100 17,146.27 17,146.27 17,169.90 17,169.90 17,170.38 17,170.38 17,147.70 17,147.70 17,123.21 17,123.21 17,119.50 17,119.50 17,139.60 17,139.60 17,164.53 17,164.53
34 Aspal Modifikasi (Retona) Kg 12,500 12,500 12,533.82 12,533.82 12,551.10 12,551.10 12,551.45 12,551.45 12,534.87 12,534.87 12,516.97 12,516.97 12,514.26 12,514.26 12,528.95 12,528.95 12,547.17 12,547.17
35 Aspal Modifikasi (Starbit) Kg 16,800 16,800 16,845.45 16,845.45 16,868.68 16,868.68 16,869.15 16,869.15 16,846.87 16,846.87 16,822.80 16,822.80 16,819.16 16,819.16 16,838.91 16,838.91 16,863.40 16,863.40
36 Aspal Minyak (Curah) Kg 10,100 10,100 10,127.33 10,127.33 10,141.29 10,141.29 10,141.57 10,141.57 10,128.18 10,128.18 10,113.71 10,113.71 10,111.52 10,111.52 10,123.39 10,123.39 10,138.11 10,138.11
37 Assetilline Botol 163,800 163,800 164,243.19 164,243.19 164,469.61 164,469.61 164,474.19 164,474.19 164,256.96 164,256.96 164,022.33 164,022.33 163,986.83 163,986.83 164,179.33 164,179.33 164,418.11 164,418.11
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 12,100 12,100 12,132.74 12,132.74 12,149.46 12,149.46 12,149.80 12,149.80 12,133.76 12,133.76 12,116.42 12,116.42 12,113.80 12,113.80 12,128.02 12,128.02 12,145.66 12,145.66
40 Beton B-0 M3 620,681 620,681 622,360.07 622,360.07 623,218.05 623,218.05 623,235.40 623,235.40 622,412.26 622,412.26 621,523.20 621,523.20 621,388.66 621,388.66 622,118.12 622,118.12 623,022.89 623,022.89
41 Beton K-125 (fc' 10 MPa) M3 641,721 641,721 643,457.02 643,457.02 644,344.09 644,344.09 644,362.02 644,362.02 643,510.98 643,510.98 642,591.78 642,591.78 642,452.68 642,452.68 643,206.87 643,206.87 644,142.31 644,142.31
42 Beton K-175 (fc' 15 MPa) M3 694,321 694,321 696,199.40 696,199.40 697,159.17 697,159.17 697,178.58 697,178.58 696,257.78 696,257.78 695,263.24 695,263.24 695,112.73 695,112.73 695,928.75 695,928.75 696,940.86 696,940.86
43 Beton K-250 (fc' 20 MPa) M3 773,221 773,221 775,312.97 775,312.97 776,381.81 776,381.81 776,403.42 776,403.42 775,377.99 775,377.99 774,270.43 774,270.43 774,102.82 774,102.82 775,011.56 775,011.56 776,138.69 776,138.69
44 Beton K-300 (fc' 25 MPa) M3 804,781 804,781 806,958.40 806,958.40 808,070.86 808,070.86 808,093.36 808,093.36 807,026.07 807,026.07 805,873.30 805,873.30 805,698.85 805,698.85 806,644.68 806,644.68 807,817.82 807,817.82
45 Beton K-350 (fc' 30 MPa) M3 836,341 836,341 838,603.83 838,603.83 839,759.91 839,759.91 839,783.29 839,783.29 838,674.15 838,674.15 837,476.18 837,476.18 837,294.88 837,294.88 838,277.81 838,277.81 839,496.95 839,496.95
46 Beton K-400 (fc' 35 MPa) M3 867,901 867,901 870,249.25 870,249.25 871,448.97 871,448.97 871,473.23 871,473.23 870,322.23 870,322.23 869,079.05 869,079.05 868,890.92 868,890.92 869,910.93 869,910.93 871,176.08 871,176.08
47 Beton K-450 (fc' 40 MPa) M3 909,981 909,981 912,443.16 912,443.16 913,701.04 913,701.04 913,726.47 913,726.47 912,519.67 912,519.67 911,216.22 911,216.22 911,018.96 911,018.96 912,088.43 912,088.43 913,414.92 913,414.92
48 Beton K-500 (fc' 45 MPa) M3 946,801 946,801 949,362.82 949,362.82 950,671.60 950,671.60 950,698.07 950,698.07 949,442.43 949,442.43 948,086.24 948,086.24 947,881.00 947,881.00 948,993.74 948,993.74 950,373.90 950,373.90
49 Bunker Oil Liter 4,400 4,400 4,411.90 4,411.90 4,417.99 4,417.99 4,418.11 4,418.11 4,412.27 4,412.27 4,405.97 4,405.97 4,405.02 4,405.02 4,410.19 4,410.19 4,416.60 4,416.60
50 Cat Kg 68,400 68,400 68,585.07 68,585.07 68,679.62 68,679.62 68,681.53 68,681.53 68,590.82 68,590.82 68,492.84 68,492.84 68,478.02 68,478.02 68,558.40 68,558.40 68,658.11 68,658.11
51 Cat Anti Karat Kg 76,800 76,800 77,007.79 77,007.79 77,113.96 77,113.96 77,116.10 77,116.10 77,014.25 77,014.25 76,904.24 76,904.24 76,887.60 76,887.60 76,977.86 76,977.86 77,089.81 77,089.81
52 Cat Marka (Non Thermoplas) Kg 75,000 75,000 75,202.92 75,202.92 75,306.60 75,306.60 75,308.69 75,308.69 75,209.23 75,209.23 75,101.80 75,101.80 75,085.54 75,085.54 75,173.69 75,173.69 75,283.02 75,283.02
53 Cat Marka (Thermoplastic) Kg 75,000 75,000 75,202.92 75,202.92 75,306.60 75,306.60 75,308.69 75,308.69 75,209.23 75,209.23 75,101.80 75,101.80 75,085.54 75,085.54 75,173.69 75,173.69 75,283.02 75,283.02
54 Cerucuk Diameter 10-15 cm M' 26,300 26,300 26,371.16 26,371.16 26,407.51 26,407.51 26,408.25 26,408.25 26,373.37 26,373.37 26,335.70 26,335.70 26,330.00 26,330.00 26,360.91 26,360.91 26,399.24 26,399.24
55 Cold Mix (Aspal Dingin) Kg 7,900 7,900 7,921.37 7,921.37 7,932.29 7,932.29 7,932.52 7,932.52 7,922.04 7,922.04 7,910.72 7,910.72 7,909.01 7,909.01 7,918.30 7,918.30 7,929.81 7,929.81
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,372,900 1,372,900 1,376,614.59 1,376,614.59 1,378,512.38 1,378,512.38 1,378,550.75 1,378,550.75 1,376,730.03 1,376,730.03 1,374,763.49 1,374,763.49 1,374,465.89 1,374,465.89 1,376,079.42 1,376,079.42 1,378,080.70 1,378,080.70
57 Curing Compound Liter 52,600 52,600 52,742.32 52,742.32 52,815.03 52,815.03 52,816.50 52,816.50 52,746.74 52,746.74 52,671.40 52,671.40 52,659.99 52,659.99 52,721.81 52,721.81 52,798.49 52,798.49
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 641,700 641,700 643,436.22 643,436.22 644,323.25 644,323.25 644,341.19 644,341.19 643,490.18 643,490.18 642,571.01 642,571.01 642,431.91 642,431.91 643,186.07 643,186.07 644,121.49 644,121.49
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 746,900 746,900 748,920.85 748,920.85 749,953.31 749,953.31 749,974.18 749,974.18 748,983.66 748,983.66 747,913.80 747,913.80 747,751.89 747,751.89 748,629.70 748,629.70 749,718.46 749,718.46
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 946,800 946,800 949,361.71 949,361.71 950,670.49 950,670.49 950,696.96 950,696.96 949,441.32 949,441.32 948,085.13 948,085.13 947,879.89 947,879.89 948,992.64 948,992.64 950,372.79 950,372.79
61 Kerosen/Minyak Tanah Liter 16,800 16,800 16,845.45 16,845.45 16,868.68 16,868.68 16,869.15 16,869.15 16,846.87 16,846.87 16,822.80 16,822.80 16,819.16 16,819.16 16,838.91 16,838.91 16,863.40 16,863.40
62 Minyak Fluks Liter 8,400 8,400 8,422.73 8,422.73 8,434.34 8,434.34 8,434.57 8,434.57 8,423.43 8,423.43 8,411.40 8,411.40 8,409.58 8,409.58 8,419.45 8,419.45 8,431.70 8,431.70
63 Minyak Pelumas/Olie Liter 51,300 51,300 51,438.80 51,438.80 51,509.71 51,509.71 51,511.15 51,511.15 51,443.11 51,443.11 51,369.63 51,369.63 51,358.51 51,358.51 51,418.80 51,418.80 51,493.58 51,493.58
64 Oxygen (Isi 6 M3) Botol 180,500 180,500 180,988.37 180,988.37 181,237.88 181,237.88 181,242.92 181,242.92 181,003.55 181,003.55 180,745.00 180,745.00 180,705.87 180,705.87 180,918.01 180,918.01 181,181.13 181,181.13
65 Polytene 125 Mikron Kg 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
66 Sand Sheet Ton 1,451,800 1,451,800 1,455,728.07 1,455,728.07 1,457,734.92 1,457,734.92 1,457,775.50 1,457,775.50 1,455,850.14 1,455,850.14 1,453,770.59 1,453,770.59 1,453,455.88 1,453,455.88 1,455,162.14 1,455,162.14 1,457,278.44 1,457,278.44
67 Seal Coat M2 115,700 115,700 116,013.04 116,013.04 116,172.98 116,172.98 116,176.21 116,176.21 116,022.77 116,022.77 115,857.04 115,857.04 115,831.96 115,831.96 115,967.94 115,967.94 116,136.60 116,136.60
68 Seal Guard Kg 37,900 37,900 38,002.54 38,002.54 38,054.93 38,054.93 38,055.99 38,055.99 38,005.73 38,005.73 37,951.44 37,951.44 37,943.23 37,943.23 37,987.77 37,987.77 38,043.02 38,043.02
69 Semen/PC (50 kg) Zak 71,500 71,500 71,693.45 71,693.45 71,792.29 71,792.29 71,794.29 71,794.29 71,699.47 71,699.47 71,597.05 71,597.05 71,581.55 71,581.55 71,665.58 71,665.58 71,769.81 71,769.81
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 42,100 42,100 42,213.91 42,213.91 42,272.10 42,272.10 42,273.28 42,273.28 42,217.45 42,217.45 42,157.14 42,157.14 42,148.02 42,148.02 42,197.50 42,197.50 42,258.87 42,258.87
72 Solar Liter 12,900 12,900 12,934.90 12,934.90 12,952.73 12,952.73 12,953.10 12,953.10 12,935.99 12,935.99 12,917.51 12,917.51 12,914.71 12,914.71 12,929.87 12,929.87 12,948.68 12,948.68
73 Thinner Liter 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 18,400 18,400 18,449.78 18,449.78 18,475.22 18,475.22 18,475.73 18,475.73 18,451.33 18,451.33 18,424.98 18,424.98 18,420.99 18,420.99 18,442.61 18,442.61 18,469.43 18,469.43
75 Baja Prategang Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,800 16,800 16,845.45 16,845.45 16,868.68 16,868.68 16,869.15 16,869.15 16,846.87 16,846.87 16,822.80 16,822.80 16,819.16 16,819.16 16,838.91 16,838.91 16,863.40 16,863.40
77 Baja Tulangan (Polos) U25 Kg 12,500 12,500 12,533.82 12,533.82 12,551.10 12,551.10 12,551.45 12,551.45 12,534.87 12,534.87 12,516.97 12,516.97 12,514.26 12,514.26 12,528.95 12,528.95 12,547.17 12,547.17
78 Baja Tulangan (Polos) U32 Kg 12,500 12,500 12,533.82 12,533.82 12,551.10 12,551.10 12,551.45 12,551.45 12,534.87 12,534.87 12,516.97 12,516.97 12,514.26 12,514.26 12,528.95 12,528.95 12,547.17 12,547.17
79 Baja Tulangan (Polos) U36 Kg 12,500 12,500 12,533.82 12,533.82 12,551.10 12,551.10 12,551.45 12,551.45 12,534.87 12,534.87 12,516.97 12,516.97 12,514.26 12,514.26 12,528.95 12,528.95 12,547.17 12,547.17
80 Baja Tulangan (Ulir) D16 Kg 16,850 16,850 16,895.59 16,895.59 16,918.88 16,918.88 16,919.35 16,919.35 16,897.01 16,897.01 16,872.87 16,872.87 16,869.22 16,869.22 16,889.02 16,889.02 16,913.58 16,913.58
81 Baja Tulangan (Ulir) D19 Kg 16,850 16,850 16,895.59 16,895.59 16,918.88 16,918.88 16,919.35 16,919.35 16,897.01 16,897.01 16,872.87 16,872.87 16,869.22 16,869.22 16,889.02 16,889.02 16,913.58 16,913.58
82 Baja Tulangan (Ulir) D24 Kg 16,850 16,850 16,895.59 16,895.59 16,918.88 16,918.88 16,919.35 16,919.35 16,897.01 16,897.01 16,872.87 16,872.87 16,869.22 16,869.22 16,889.02 16,889.02 16,913.58 16,913.58
83 Baja Tulangan (Ulir) D32 Kg 16,850 16,850 16,895.59 16,895.59 16,918.88 16,918.88 16,919.35 16,919.35 16,897.01 16,897.01 16,872.87 16,872.87 16,869.22 16,869.22 16,889.02 16,889.02 16,913.58 16,913.58
84 Baja Tulangan (Ulir) D36 Kg 16,850 16,850 16,895.59 16,895.59 16,918.88 16,918.88 16,919.35 16,919.35 16,897.01 16,897.01 16,872.87 16,872.87 16,869.22 16,869.22 16,889.02 16,889.02 16,913.58 16,913.58
85 Besi Beton Kg 8,800 8,800 8,823.81 8,823.81 8,835.97 8,835.97 8,836.22 8,836.22 8,824.55 8,824.55 8,811.94 8,811.94 8,810.04 8,810.04 8,820.38 8,820.38 8,833.21 8,833.21
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,676,000 13,676,000 13,713,002.51 13,713,002.51 13,731,907.10 13,731,907.10 13,732,289.36 13,732,289.36 13,714,152.47 13,714,152.47 13,694,562.99 13,694,562.99 13,691,598.47 13,691,598.47 13,707,671.42 13,707,671.42 13,727,607.03 13,727,607.03
87 Box Culvert Type DUB 200×200 M' 14,517,600 14,517,600 14,556,879.59 14,556,879.59 14,576,947.54 14,576,947.54 14,577,353.32 14,577,353.32 14,558,100.31 14,558,100.31 14,537,305.33 14,537,305.33 14,534,158.37 14,534,158.37 14,551,220.43 14,551,220.43 14,572,382.85 14,572,382.85
88 Box Culvert Type uk 300×200 M' 15,674,800 15,674,800 15,717,210.57 15,717,210.57 15,738,878.14 15,738,878.14 15,739,316.27 15,739,316.27 15,718,528.60 15,718,528.60 15,696,076.04 15,696,076.04 15,692,678.24 15,692,678.24 15,711,100.32 15,711,100.32 15,733,949.60 15,733,949.60
89 Casing M2 14,100 14,100 14,138.15 14,138.15 14,157.64 14,157.64 14,158.03 14,158.03 14,139.34 14,139.34 14,119.14 14,119.14 14,116.08 14,116.08 14,132.65 14,132.65 14,153.21 14,153.21
90 Ducting (Kabel Prestress) M' 203,800 203,800 204,351.41 204,351.41 204,633.13 204,633.13 204,638.83 204,638.83 204,368.55 204,368.55 204,076.63 204,076.63 204,032.45 204,032.45 204,271.97 204,271.97 204,569.05 204,569.05
91 Ducting (Strand Prestress) M' 177,500 177,500 177,980.25 177,980.25 178,225.61 178,225.61 178,230.58 178,230.58 177,995.18 177,995.18 177,740.93 177,740.93 177,702.45 177,702.45 177,911.06 177,911.06 178,169.80 178,169.80
92 Expansion Cap M2 10,300 10,300 10,327.87 10,327.87 10,342.11 10,342.11 10,342.39 10,342.39 10,328.73 10,328.73 10,313.98 10,313.98 10,311.75 10,311.75 10,323.85 10,323.85 10,338.87 10,338.87
93 Expansion Join Baja Siku M' 2,289,300 2,289,300 2,295,494.05 2,295,494.05 2,298,658.59 2,298,658.59 2,298,722.58 2,298,722.58 2,295,686.55 2,295,686.55 2,292,407.36 2,292,407.36 2,291,911.11 2,291,911.11 2,294,601.65 2,294,601.65 2,297,938.78 2,297,938.78
94 Expansion Join Tipe Rubber M' 1,657,400 1,657,400 1,661,884.35 1,661,884.35 1,664,175.40 1,664,175.40 1,664,221.73 1,664,221.73 1,662,023.71 1,662,023.71 1,659,649.66 1,659,649.66 1,659,290.38 1,659,290.38 1,661,238.27 1,661,238.27 1,663,654.28 1,663,654.28
95 Expansion Join Tipe Torma M' 1,900,800 1,900,800 1,905,942.91 1,905,942.91 1,908,570.42 1,908,570.42 1,908,623.55 1,908,623.55 1,906,102.74 1,906,102.74 1,903,380.03 1,903,380.03 1,902,968.00 1,902,968.00 1,905,201.95 1,905,201.95 1,907,972.76 1,907,972.76
96 Expansion Tipe Joint Asphaltic Plug M' 2,255,000 2,255,000 2,261,101.25 2,261,101.25 2,264,218.38 2,264,218.38 2,264,281.41 2,264,281.41 2,261,290.86 2,261,290.86 2,258,060.80 2,258,060.80 2,257,571.99 2,257,571.99 2,260,222.22 2,260,222.22 2,263,509.35 2,263,509.35
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 43,700 43,700 43,818.24 43,818.24 43,878.64 43,878.64 43,879.87 43,879.87 43,821.91 43,821.91 43,759.32 43,759.32 43,749.84 43,749.84 43,801.20 43,801.20 43,864.90 43,864.90
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 33,700 33,700 33,791.18 33,791.18 33,837.76 33,837.76 33,838.71 33,838.71 33,794.01 33,794.01 33,745.74 33,745.74 33,738.44 33,738.44 33,778.04 33,778.04 33,827.17 33,827.17
99 Glass Bead Kg 73,600 73,600 73,799.14 73,799.14 73,900.87 73,900.87 73,902.93 73,902.93 73,805.32 73,805.32 73,699.90 73,699.90 73,683.95 73,683.95 73,770.45 73,770.45 73,877.73 73,877.73
100 Joint Sealent Kg 47,400 47,400 47,528.25 47,528.25 47,593.77 47,593.77 47,595.09 47,595.09 47,532.23 47,532.23 47,464.34 47,464.34 47,454.06 47,454.06 47,509.77 47,509.77 47,578.87 47,578.87
101 Joint Socket Pile 16×16×16 Set 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
102 Joint Socket Pile 35×35 Set 822,800 822,800 825,026.21 825,026.21 826,163.58 826,163.58 826,186.58 826,186.58 825,095.40 825,095.40 823,916.82 823,916.82 823,738.46 823,738.46 824,705.47 824,705.47 825,904.87 825,904.87
103 Kawat Beton Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
104 Kawat Bronjong Kg 35,800 35,800 35,896.86 35,896.86 35,946.35 35,946.35 35,947.35 35,947.35 35,899.87 35,899.87 35,848.59 35,848.59 35,840.83 35,840.83 35,882.91 35,882.91 35,935.09 35,935.09
105 Kawat Las Dos 144,700 144,700 145,091.51 145,091.51 145,291.53 145,291.53 145,295.57 145,295.57 145,103.68 145,103.68 144,896.41 144,896.41 144,865.04 144,865.04 145,035.10 145,035.10 145,246.03 145,246.03
106 Kayu Acuan (Kelas III/Meranti) M3 4,523,600 4,523,600 4,535,839.29 4,535,839.29 4,542,092.35 4,542,092.35 4,542,218.79 4,542,218.79 4,536,219.66 4,536,219.66 4,529,740.07 4,529,740.07 4,528,759.49 4,528,759.49 4,534,075.93 4,534,075.93 4,540,670.02 4,540,670.02
107 Kayu Perancah (Gelam) M3 3,005,415 3,005,415 3,013,546.61 3,013,546.61 3,017,701.05 3,017,701.05 3,017,785.06 3,017,785.06 3,013,799.32 3,013,799.32 3,009,494.37 3,009,494.37 3,008,842.89 3,008,842.89 3,012,375.06 3,012,375.06 3,016,756.08 3,016,756.08
108 Kerb Pracetak Type 1 (Peninggi) Buah 57,900 57,900 58,056.66 58,056.66 58,136.69 58,136.69 58,138.31 58,138.31 58,061.53 58,061.53 57,978.59 57,978.59 57,966.04 57,966.04 58,034.09 58,034.09 58,118.49 58,118.49
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 99,900 99,900 100,170.29 100,170.29 100,308.39 100,308.39 100,311.18 100,311.18 100,178.69 100,178.69 100,035.60 100,035.60 100,013.94 100,013.94 100,131.35 100,131.35 100,276.98 100,276.98
110 Marmer Nama Jembatan Buah 631,200 631,200 632,907.81 632,907.81 633,780.33 633,780.33 633,797.97 633,797.97 632,960.88 632,960.88 632,056.75 632,056.75 631,919.93 631,919.93 632,661.76 632,661.76 633,581.86 633,581.86
111 Mata Kucing Buah 165,700 165,700 166,148.33 166,148.33 166,377.38 166,377.38 166,382.01 166,382.01 166,162.26 166,162.26 165,924.91 165,924.91 165,888.99 165,888.99 166,083.73 166,083.73 166,325.28 166,325.28
112 Matras Concrete (Tebal=10 cm) M2 154,300 154,300 154,717.48 154,717.48 154,930.77 154,930.77 154,935.09 154,935.09 154,730.46 154,730.46 154,509.44 154,509.44 154,475.99 154,475.99 154,657.33 154,657.33 154,882.26 154,882.26
113 Mini Pile 16×16×16 M' 142,800 142,800 143,186.37 143,186.37 143,383.76 143,383.76 143,387.75 143,387.75 143,198.37 143,198.37 142,993.83 142,993.83 142,962.87 142,962.87 143,130.70 143,130.70 143,338.86 143,338.86
114 Mini Timber Pile Buah 33,100 33,100 33,189.56 33,189.56 33,235.31 33,235.31 33,236.24 33,236.24 33,192.34 33,192.34 33,144.93 33,144.93 33,137.75 33,137.75 33,176.65 33,176.65 33,224.90 33,224.90
115 Multipleks 12 mm Lbr 168,300 168,300 168,755.36 168,755.36 168,988.01 168,988.01 168,992.71 168,992.71 168,769.51 168,769.51 168,528.44 168,528.44 168,491.96 168,491.96 168,689.76 168,689.76 168,935.09 168,935.09
116 Paku Kg 22,100 22,100 22,159.79 22,159.79 22,190.34 22,190.34 22,190.96 22,190.96 22,161.65 22,161.65 22,130.00 22,130.00 22,125.21 22,125.21 22,151.18 22,151.18 22,183.40 22,183.40
117 Paving Block (Model Bata 8 cm) M2 99,900 99,900 100,170.29 100,170.29 100,308.39 100,308.39 100,311.18 100,311.18 100,178.69 100,178.69 100,035.60 100,035.60 100,013.94 100,013.94 100,131.35 100,131.35 100,276.98 100,276.98
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 69,935,300 69,935,300 70,124,520.67 70,124,520.67 70,221,193.53 70,221,193.53 70,223,148.31 70,223,148.31 70,130,401.21 70,130,401.21 70,030,226.03 70,030,226.03 70,015,066.28 70,015,066.28 70,097,258.93 70,097,258.93 70,199,204.15 70,199,204.15
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 99,075,000 99,075,000 99,343,062.60 99,343,062.60 99,480,015.80 99,480,015.80 99,482,785.08 99,482,785.08 99,351,393.36 99,351,393.36 99,209,478.53 99,209,478.53 99,188,002.21 99,188,002.21 99,304,441.79 99,304,441.79 99,448,864.19 99,448,864.19
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 189,360,200 189,360,200 189,872,543.05 189,872,543.05 190,134,299.15 190,134,299.15 190,139,592.01 190,139,592.01 189,888,465.48 189,888,465.48 189,617,226.31 189,617,226.31 189,576,179.02 189,576,179.02 189,798,727.82 189,798,727.82 190,074,759.65 190,074,759.65
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 248,316,000 248,316,000 248,987,857.00 248,987,857.00 249,331,108.79 249,331,108.79 249,338,049.55 249,338,049.55 249,008,736.76 249,008,736.76 248,653,049.42 248,653,049.42 248,599,222.38 248,599,222.38 248,891,059.98 248,891,059.98 249,253,032.14 249,253,032.14
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 316,537,200 316,537,200 317,393,639.92 317,393,639.92 317,831,195.13 317,831,195.13 317,840,042.76 317,840,042.76 317,420,256.09 317,420,256.09 316,966,848.83 316,966,848.83 316,898,233.60 316,898,233.60 317,270,249.33 317,270,249.33 317,731,668.06 317,731,668.06
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 381,901,500 381,901,500 382,934,793.05 382,934,793.05 383,462,702.54 383,462,702.54 383,473,377.19 383,473,377.19 382,966,905.40 382,966,905.40 382,419,870.46 382,419,870.46 382,337,086.32 382,337,086.32 382,785,922.55 382,785,922.55 383,342,623.33 383,342,623.33
124 Pelat Rambu (Eng. Grade) Buah 220,900 220,900 221,497.68 221,497.68 221,803.03 221,803.03 221,809.21 221,809.21 221,516.25 221,516.25 221,199.84 221,199.84 221,151.95 221,151.95 221,411.57 221,411.57 221,733.58 221,733.58
125 Pelat Rambu (High L Grade) Buah 257,700 257,700 258,397.25 258,397.25 258,753.47 258,753.47 258,760.67 258,760.67 258,418.92 258,418.92 258,049.79 258,049.79 257,993.93 257,993.93 258,296.79 258,296.79 258,672.44 258,672.44
126 Pemantul Cahaya (Reflector) Buah 15,300 15,300 15,341.40 15,341.40 15,362.55 15,362.55 15,362.97 15,362.97 15,342.68 15,342.68 15,320.77 15,320.77 15,317.45 15,317.45 15,335.43 15,335.43 15,357.74 15,357.74
127 Pipa Baja D10" Kg 23,700 23,700 23,764.12 23,764.12 23,796.88 23,796.88 23,797.55 23,797.55 23,766.12 23,766.12 23,732.17 23,732.17 23,727.03 23,727.03 23,754.89 23,754.89 23,789.43 23,789.43
128 Pipa Drainase Baja Dia 3" M' 289,500 289,500 290,283.29 290,283.29 290,683.47 290,683.47 290,691.56 290,691.56 290,307.63 290,307.63 289,892.95 289,892.95 289,830.20 289,830.20 290,170.44 290,170.44 290,592.44 290,592.44
129 Pipa Galvanis Dia 1,5" M' 250,000 250,000 250,676.41 250,676.41 251,021.99 251,021.99 251,028.98 251,028.98 250,697.43 250,697.43 250,339.34 250,339.34 250,285.14 250,285.14 250,578.96 250,578.96 250,943.39 250,943.39
130 Pipa Galvanis Dia 2" M' 331,400 331,400 332,296.65 332,296.65 332,754.75 332,754.75 332,764.02 332,764.02 332,324.52 332,324.52 331,849.82 331,849.82 331,777.99 331,777.99 332,167.47 332,167.47 332,650.55 332,650.55
131 Pipa Galvanis Dia 3" M' 253,800 253,800 254,486.69 254,486.69 254,837.53 254,837.53 254,844.62 254,844.62 254,508.04 254,508.04 254,144.49 254,144.49 254,089.48 254,089.48 254,387.76 254,387.76 254,757.73 254,757.73
132 Pipa Porus M' 47,300 47,300 47,427.98 47,427.98 47,493.36 47,493.36 47,494.68 47,494.68 47,431.95 47,431.95 47,364.20 47,364.20 47,353.95 47,353.95 47,409.54 47,409.54 47,478.49 47,478.49
133 Pipa PVC Dia 4" M' 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11 200,463.17 200,463.17 200,754.71 200,754.71
134 Plastik Filter M2 37,900 37,900 38,002.54 38,002.54 38,054.93 38,054.93 38,055.99 38,055.99 38,005.73 38,005.73 37,951.44 37,951.44 37,943.23 37,943.23 37,987.77 37,987.77 38,043.02 38,043.02
135 Rel Pengaman M' 178,800 178,800 179,283.77 179,283.77 179,530.93 179,530.93 179,535.93 179,535.93 179,298.81 179,298.81 179,042.69 179,042.69 179,003.93 179,003.93 179,214.07 179,214.07 179,474.71 179,474.71
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,160,800 2,160,800 2,166,646.38 2,166,646.38 2,169,633.29 2,169,633.29 2,169,693.69 2,169,693.69 2,166,828.07 2,166,828.07 2,163,732.94 2,163,732.94 2,163,264.55 2,163,264.55 2,165,804.07 2,165,804.07 2,168,953.88 2,168,953.88
137 Strip Bearing Buah 331,400 331,400 332,296.65 332,296.65 332,754.75 332,754.75 332,764.02 332,764.02 332,324.52 332,324.52 331,849.82 331,849.82 331,777.99 331,777.99 332,167.47 332,167.47 332,650.55 332,650.55
138 Tiang Pancang Baja Diameter 400 M' 765,600 765,600 767,671.45 767,671.45 768,729.75 768,729.75 768,751.15 768,751.15 767,735.82 767,735.82 766,639.18 766,639.18 766,473.22 766,473.22 767,373.01 767,373.01 768,489.03 768,489.03
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 935,700 935,700 938,231.68 938,231.68 939,525.12 939,525.12 939,551.27 939,551.27 938,310.36 938,310.36 936,970.06 936,970.06 936,767.23 936,767.23 937,866.93 937,866.93 939,230.91 939,230.91
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,956,700 1,956,700 1,961,994.15 1,961,994.15 1,964,698.93 1,964,698.93 1,964,753.63 1,964,753.63 1,962,158.68 1,962,158.68 1,959,355.91 1,959,355.91 1,958,931.76 1,958,931.76 1,961,231.40 1,961,231.40 1,964,083.70 1,964,083.70
HARGA SATUAN DASAR UPAH KABUPATEN BOJONEGORO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 126,725.64 126,725.64 126,597.57 126,597.57 126,413.41 126,413.41 126,343.93 126,343.93 126,450.94 126,450.94 126,632.46 126,632.46 126,719.81 126,719.81 126,526.63 126,526.63
2 Tukang OH 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 142,367.52
3 Mandor OH 163,779.34 163,779.34 163,613.81 163,613.81 163,375.81 163,375.81 163,286.01 163,286.01 163,424.31 163,424.31 163,658.91 163,658.91 163,771.80 163,771.80 163,522.13 163,522.13
4 Operator OH 338,001.99 338,001.99 337,660.39 337,660.39 337,169.20 337,169.20 336,983.88 336,983.88 337,269.31 337,269.31 337,753.46 337,753.46 337,986.43 337,986.43 337,471.18 337,471.18
5 Pembantu Operator OH 211,276.35 211,276.35 211,062.82 211,062.82 210,755.79 210,755.79 210,639.95 210,639.95 210,818.37 210,818.37 211,121.00 211,121.00 211,266.62 211,266.62 210,944.55 210,944.55
6 Sopir OH 158,457.26 158,457.26 158,297.11 158,297.11 158,066.84 158,066.84 157,979.96 157,979.96 158,113.77 158,113.77 158,340.75 158,340.75 158,449.97 158,449.97 158,208.41 158,208.41
7 Pembantu Sopir OH 137,369.79 137,369.79 137,230.96 137,230.96 137,031.33 137,031.33 136,956.01 136,956.01 137,072.02 137,072.02 137,268.79 137,268.79 137,363.47 137,363.47 137,154.06 137,154.06
8 Mekanik OH 190,188.88 190,188.88 189,996.66 189,996.66 189,720.28 189,720.28 189,616.00 189,616.00 189,776.61 189,776.61 190,049.04 190,049.04 190,180.12 190,180.12 189,890.20 189,890.20
9 Pembantu Mekanik OH 137,369.79 137,369.79 137,230.96 137,230.96 137,031.33 137,031.33 136,956.01 136,956.01 137,072.02 137,072.02 137,268.79 137,268.79 137,363.47 137,363.47 137,154.06 137,154.06
10 Kepala Tukang OH 158,457.26 158,457.26 158,297.11 158,297.11 158,066.84 158,066.84 157,979.96 157,979.96 158,113.77 158,113.77 158,340.75 158,340.75 158,449.97 158,449.97 158,208.41 158,208.41
11 Pemasak Aspal OH 158,457.26 158,457.26 158,297.11 158,297.11 158,066.84 158,066.84 157,979.96 157,979.96 158,113.77 158,113.77 158,340.75 158,340.75 158,449.97 158,449.97 158,208.41 158,208.41

HARGA SATUAN DASAR ALAT KABUPATEN BOJONEGORO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 497,556.38 555,704.99 497,053.52 555,143.37 496,330.47 554,335.81 496,057.67 554,031.13 496,477.83 554,500.40 497,190.53 555,296.39 497,533.48 555,679.41 496,775.00 1,010,201.06
2 Asphalt Distribution Unit/Jam 306,351.06 394,034.41 306,041.45 393,636.17 305,596.25 393,063.56 305,428.29 392,847.52 305,686.99 393,180.26 306,125.81 393,744.68 306,336.96 394,016.27 305,869.96 673,791.27
3 Asphalt Finisher Unit/Jam 225,009.57 1,066,925.47 224,782.17 1,065,847.18 224,455.18 1,064,296.71 224,331.81 1,063,711.73 224,521.82 1,064,612.71 224,844.13 1,066,140.98 224,999.22 1,066,876.36 224,656.21 1,271,181.03
4 Asphalt Liquid Mixer Unit/Jam 80,285.11 146,808.95 80,203.97 146,660.57 80,087.29 146,447.23 80,043.28 146,366.73 80,111.07 146,490.71 80,226.07 146,701.00 80,281.41 146,802.19 80,159.02 220,056.15
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 107,751.06 107,751.06 107,642.16 107,642.16 107,485.58 107,485.58 107,426.50 107,426.50 107,517.49 107,517.49 107,671.84 107,671.84 107,746.10 107,746.10 107,581.85 206,196.74
6 Asphalt Mixing Plant Unit/Jam 1,204,276.59 5,876,095.30 1,203,059.48 5,870,156.58 1,201,309.41 5,861,617.41 1,200,649.13 5,858,395.63 1,201,666.09 5,863,357.77 1,203,391.10 5,871,774.70 1,204,221.15 5,875,824.81 1,202,385.35 6,969,033.72
7 Asphalt Sprayer Unit/Jam 99,300.00 99,300.00 99,199.64 99,199.64 99,055.34 99,055.34 99,000.89 99,000.89 99,084.75 99,084.75 99,226.99 99,226.99 99,295.43 99,295.43 99,144.06 190,024.45
8 Asphalt Tanker Unit/Jam 464,808.51 538,734.60 464,338.75 538,190.13 463,663.28 537,407.23 463,408.44 537,111.85 463,800.95 537,566.80 464,466.74 538,338.48 464,787.11 538,709.80 464,078.56 963,286.13
9 Blending Equipment Unit/Jam 151,062.77 238,790.47 150,910.09 238,549.14 150,690.57 238,202.13 150,607.74 238,071.20 150,735.31 238,272.85 150,951.69 238,614.89 151,055.81 238,779.48 150,825.53 376,669.68
10 Bore Pile Machine Unit/Jam 416,214.89 723,601.41 415,794.24 722,870.09 415,189.39 721,818.55 414,961.19 721,421.81 415,312.67 722,032.87 415,908.85 723,069.35 416,195.73 723,568.10 415,561.25 1,103,389.23
11 Bore Pile Machine Dia 60 Unit/Jam 272,546.81 824,017.92 272,271.36 823,185.12 271,875.29 821,987.65 271,725.86 821,535.86 271,956.01 822,231.71 272,346.41 823,412.03 272,534.26 823,979.99 272,118.79 1,072,161.52
12 Bore Pile Machine Dia 80 Unit/Jam 1,077,510.63 1,077,510.63 1,076,421.64 1,076,421.64 1,074,855.79 1,074,855.79 1,074,265.01 1,074,265.01 1,075,174.93 1,075,174.93 1,076,718.35 1,076,718.35 1,077,461.03 1,077,461.03 1,075,818.47 2,061,967.38
13 Bulldozer 100-150 HP Unit/Jam 422,553.19 612,741.58 422,126.13 612,122.30 421,512.08 611,231.86 421,280.40 610,895.91 421,637.23 611,413.34 422,242.49 612,291.04 422,533.74 612,713.37 421,889.60 998,504.37
14 Cement Tanker Unit/Jam 392,974.47 507,103.40 392,577.30 506,590.89 392,006.23 505,853.97 391,790.77 505,575.93 392,122.62 506,004.16 392,685.52 506,730.54 392,956.38 507,080.06 392,357.33 865,961.34
15 Cold Milling Unit/Jam 613,758.51 1,399,928.73 613,138.21 1,398,513.88 612,246.29 1,396,479.49 611,909.78 1,395,711.94 612,428.07 1,396,894.12 613,307.22 1,398,899.38 613,730.25 1,399,864.29 612,794.64 1,959,448.39
16 Cold Recycler Unit/Jam 5,168,881.88 5,168,881.88 5,163,657.91 5,163,657.91 5,156,146.46 5,156,146.46 5,153,312.44 5,153,312.44 5,157,677.36 5,157,677.36 5,165,081.28 5,165,081.28 5,168,643.95 5,168,643.95 5,160,764.50 9,891,378.83
17 Compressor 4000-6500 L\M Unit/Jam 157,401.06 157,401.06 157,241.98 157,241.98 157,013.25 157,013.25 156,926.95 156,926.95 157,059.87 157,059.87 157,285.33 157,285.33 157,393.82 157,393.82 157,153.87 301,208.96
18 Concrete Breaker Unit/Jam 573,615.95 1,093,335.02 573,036.22 1,092,230.03 572,202.64 1,090,641.19 571,888.14 1,090,041.73 572,372.53 1,090,965.01 573,194.18 1,092,531.10 573,589.55 1,093,284.69 572,715.13 1,616,597.28
19 Concrete Mixer (350) Unit/Jam 106,694.68 106,694.68 106,586.85 106,586.85 106,431.80 106,431.80 106,373.30 106,373.30 106,463.40 106,463.40 106,616.23 106,616.23 106,689.77 106,689.77 106,527.12 204,175.20
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 121,484.04 121,484.04 121,361.26 121,361.26 121,184.72 121,184.72 121,118.11 121,118.11 121,220.70 121,220.70 121,394.72 121,394.72 121,478.45 121,478.45 121,293.26 232,476.71
21 Concrete Pan Mixer Unit/Jam 323,253.19 691,970.21 322,926.49 691,270.86 322,456.74 690,265.29 322,279.50 689,885.89 322,552.48 690,470.23 323,015.51 691,461.41 323,238.31 691,938.35 322,745.54 986,728.19
22 Concrete Pump Unit/Jam 246,137.23 264,095.43 245,888.47 263,828.52 245,530.78 263,444.74 245,395.83 263,299.94 245,603.68 263,522.96 245,956.25 263,901.25 246,125.90 264,083.28 245,750.69 488,948.04
23 Concrete Vibrator Unit/Jam 91,905.32 91,905.32 91,812.43 91,812.43 91,678.88 91,678.88 91,628.49 91,628.49 91,706.10 91,706.10 91,837.74 91,837.74 91,901.09 91,901.09 91,760.99 175,873.69
24 Crane 10-15 Ton Unit/Jam 329,591.49 384,401.45 329,258.38 384,012.95 328,779.42 383,454.34 328,598.71 383,243.57 328,877.04 383,568.19 329,349.14 384,118.80 329,576.32 384,383.75 329,073.89 685,443.32
25 Crane On Track 35 Ton Unit/Jam 273,603.19 519,755.88 273,326.67 519,230.59 272,929.07 518,475.27 272,779.06 518,190.30 273,010.10 518,629.21 273,402.01 519,373.71 273,590.60 519,731.96 273,173.51 769,344.12
26 Crane On Track 75-100 Ton Unit/Jam 429,947.87 651,803.60 429,513.34 651,144.85 428,888.54 650,197.64 428,652.80 649,840.27 429,015.88 650,390.69 429,631.74 651,324.34 429,928.08 651,773.60 429,272.67 1,044,272.74
27 Dump Truck 10 Ton Unit/Jam 406,707.44 437,313.92 406,296.40 436,871.95 405,705.37 436,236.44 405,482.38 435,996.67 405,825.83 436,365.96 406,408.40 436,992.37 406,688.72 437,293.79 406,068.74 808,850.02
28 Dump Truck 3-4 M3 Unit/Jam 221,840.42 260,075.76 221,616.22 259,812.91 221,293.84 259,434.97 221,172.21 259,292.37 221,359.54 259,512.00 221,677.31 259,884.53 221,830.21 260,063.79 221,492.04 462,697.99
29 Excavator 80-140 HP Unit/Jam 321,140.42 510,216.31 320,815.86 509,700.66 320,349.18 508,959.21 320,173.10 508,679.47 320,444.29 509,110.32 320,904.29 509,841.16 321,125.64 510,192.83 320,636.09 803,326.10
30 Flat Bed Truck 3-4 M3 Unit/Jam 389,805.32 520,760.05 389,411.36 520,233.74 388,844.89 519,476.97 388,631.17 519,191.44 388,960.34 519,631.20 389,518.70 520,377.14 389,787.37 520,736.08 389,193.15 876,696.10
31 Fulvi Mixer Unit/Jam 976,097.87 1,524,322.70 975,111.37 1,522,782.13 973,692.89 1,520,566.98 973,157.71 1,519,731.21 973,981.99 1,521,018.44 975,380.16 1,523,201.89 976,052.93 1,524,252.53 974,564.97 2,415,263.75
32 Generator Set Unit/Jam 434,173.40 550,028.45 433,734.60 549,472.56 433,103.66 548,673.25 432,865.61 548,371.68 433,232.25 548,836.16 433,854.16 549,624.02 434,153.42 550,003.13 433,491.56 946,524.67
33 Hot Recycler Unit/Jam 3,189,220.19 9,352,191.72 3,185,996.98 9,342,739.85 3,181,362.39 9,329,149.19 3,179,613.79 9,324,021.52 3,182,306.96 9,331,919.09 3,186,875.21 9,345,315.18 3,189,073.39 9,351,761.21 3,184,211.74 12,256,312.13
34 Jack Hammer Unit/Jam 60,213.83 60,213.83 60,152.97 60,152.97 60,065.47 60,065.47 60,032.46 60,032.46 60,083.30 60,083.30 60,169.56 60,169.56 60,211.06 60,211.06 60,119.27 115,227.59
35 Launching Gantry Unit/Jam 76,628,964.42 76,629,449.32 76,551,518.74 76,552,003.16 76,440,161.09 76,440,644.80 76,398,146.59 76,398,630.04 76,462,856.77 76,463,340.62 76,572,620.25 76,573,104.80 76,625,437.00 76,625,921.89 76,508,623.74 146,640,731.20
36 Motor Grader > 100 HP Unit/Jam 301,069.15 527,762.09 300,764.87 527,228.70 300,327.35 526,461.76 300,162.28 526,172.39 300,416.52 526,618.07 300,847.78 527,374.03 301,055.29 527,737.80 300,596.34 802,474.88
37 Pedestrian Roller Unit/Jam 99,300.00 99,300.00 99,199.64 99,199.64 99,055.34 99,055.34 99,000.89 99,000.89 99,084.75 99,084.75 99,226.99 99,226.99 99,295.43 99,295.43 99,144.06 190,024.45
38 Pile Driver + Hammer Unit/Jam 113,032.98 330,671.58 112,918.74 330,337.39 112,754.48 329,856.85 112,692.51 329,675.55 112,787.96 329,954.79 112,949.87 330,428.45 113,027.77 330,656.36 112,855.47 433,601.24
39 Rock Drill Breaker Unit/Jam 109,863.83 357,081.13 109,752.79 356,720.24 109,593.14 356,201.33 109,532.90 356,005.55 109,625.68 356,307.09 109,783.05 356,818.57 109,858.77 357,064.69 109,691.30 457,068.87
40 Split Form Paver Unit/Jam 232,404.25 232,404.25 232,169.37 232,169.37 231,831.64 231,831.64 231,704.22 231,704.22 231,900.47 231,900.47 232,233.37 232,233.37 232,393.56 232,393.56 232,039.28 444,738.06
41 Stone Crusher Unit/Jam 622,209.57 775,416.33 621,580.73 774,632.65 620,676.53 773,505.81 620,335.38 773,080.66 620,860.81 773,735.47 621,752.07 774,846.18 622,180.93 775,380.64 621,232.43 1,343,651.24
42 Tamper Unit/Jam 92,961.70 92,961.70 92,867.75 92,867.75 92,732.66 92,732.66 92,681.69 92,681.69 92,760.19 92,760.19 92,893.35 92,893.35 92,957.42 92,957.42 92,815.71 177,895.23
43 Tandem Roller 6-8 T Unit/Jam 448,962.76 523,966.35 448,509.02 523,436.80 447,856.58 522,675.36 447,610.42 522,388.08 447,989.55 522,830.55 448,632.65 523,581.08 448,942.10 523,942.23 448,257.70 934,038.87
44 Three Wheel Roller 6-8 T Unit/Jam 148,950.00 188,782.04 148,799.46 188,591.25 148,583.01 188,316.91 148,501.34 188,213.40 148,627.12 188,372.82 148,840.48 188,643.24 148,943.14 188,773.35 148,716.08 324,806.16
45 Tire Roller 8-10 T Unit/Jam 266,208.51 480,693.86 265,939.46 480,208.04 265,552.61 479,509.49 265,406.65 479,245.94 265,631.45 479,651.86 266,012.77 480,340.41 266,196.25 480,671.73 265,790.45 723,575.75
46 Track Loader 75-100 HP Unit/Jam 249,306.38 420,637.75 249,054.42 420,212.63 248,692.12 419,601.36 248,555.43 419,370.73 248,765.96 419,725.94 249,123.07 420,328.46 249,294.91 420,618.39 248,914.86 648,144.96
47 Trailer 20 Ton Unit/Jam 402,481.91 556,709.16 402,075.14 556,146.52 401,490.25 555,337.50 401,269.58 555,032.27 401,609.46 555,502.39 402,185.97 556,299.82 402,463.39 556,683.53 401,849.84 924,190.51
48 Trailler 15 Ton Unit/Jam 348,606.38 530,299.62 348,254.06 529,763.66 347,747.46 528,993.03 347,556.33 528,702.27 347,850.71 529,150.09 348,350.06 529,909.69 348,590.33 530,275.21 348,058.92 848,514.99
49 Truck Mixer (agitator) Unit/Jam 438,398.93 644,372.78 437,955.86 643,721.54 437,318.78 642,785.13 437,078.41 642,431.83 437,448.62 642,975.98 438,076.59 643,898.98 438,378.75 644,343.12 437,710.46 1,044,588.09
50 Vibrating Rammer Unit/Jam 89,792.55 89,792.55 89,701.80 89,701.80 89,571.32 89,571.32 89,522.08 89,522.08 89,597.91 89,597.91 89,726.53 89,726.53 89,788.42 89,788.42 89,651.54 171,830.62
51 Vibratory Roller 5-8 T Unit/Jam 216,558.51 464,828.05 216,339.64 464,358.27 216,024.94 463,682.78 215,906.20 463,427.92 216,089.08 463,820.45 216,399.28 464,486.27 216,548.54 464,806.65 216,218.42 662,294.66
52 Water Pump 70-100 MM Unit/Jam 67,608.51 67,608.51 67,540.18 67,540.18 67,441.93 67,441.93 67,404.86 67,404.86 67,461.96 67,461.96 67,558.80 67,558.80 67,605.40 67,605.40 67,502.34 129,378.35
53 Water Tanker 3000-4500 L Unit/Jam 245,080.85 245,080.85 244,833.16 244,833.16 244,477.00 244,477.00 244,342.63 244,342.63 244,549.59 244,549.59 244,900.65 244,900.65 245,069.57 245,069.57 244,695.97 468,996.50
54 Welding Set Unit/Jam 137,329.79 137,329.79 137,190.99 137,190.99 136,991.42 136,991.42 136,916.13 136,916.13 137,032.10 137,032.10 137,228.81 137,228.81 137,323.46 137,323.46 137,114.12 262,799.76
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 238,742.55 432,543.13 238,501.26 432,105.98 238,154.32 431,477.41 238,023.42 431,240.25 238,225.03 431,605.52 238,567.01 432,225.09 238,731.56 432,523.22 238,367.62 650,363.51
HARGA SATUAN DASAR BAHAN KABUPATEN BOJONEGORO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 332,780.33 332,780.33 332,444.00 332,444.00 331,960.41 331,960.41 331,777.95 331,777.95 332,058.97 332,058.97 332,535.64 332,535.64 332,765.01 332,765.01 332,257.72 636,821.73
2 Agregat Pecah Mesin 20-30 mm M3 316,914.52 316,914.52 316,594.23 316,594.23 316,133.69 316,133.69 315,959.93 315,959.93 316,227.55 316,227.55 316,681.50 316,681.50 316,899.93 316,899.93 316,416.83 606,460.29
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
4 Bahan Agr. Base Kelas A M3 348,646.14 348,646.14 348,293.78 348,293.78 347,787.12 347,787.12 347,595.97 347,595.97 347,890.38 347,890.38 348,389.79 348,389.79 348,630.09 348,630.09 348,098.61 667,183.18
5 Bahan Agr. Base Kelas B M3 327,458.26 327,458.26 327,127.31 327,127.31 326,651.44 326,651.44 326,471.90 326,471.90 326,748.43 326,748.43 327,217.48 327,217.48 327,443.18 327,443.18 326,944.00 626,637.20
6 Bahan Agr. Base Kelas C M3 301,048.71 301,048.71 300,744.45 300,744.45 300,306.97 300,306.97 300,141.91 300,141.91 300,396.13 300,396.13 300,827.36 300,827.36 301,034.85 301,034.85 300,575.94 576,098.84
7 Bahan Agr. Base Kelas C2 M3 274,639.17 274,639.17 274,361.60 274,361.60 273,962.50 273,962.50 273,811.91 273,811.91 274,043.84 274,043.84 274,437.23 274,437.23 274,626.53 274,626.53 274,207.87 525,560.48
8 Bahan Agr. Base Kelas S M3 222,422.58 222,422.58 222,197.79 222,197.79 221,874.56 221,874.56 221,752.61 221,752.61 221,940.44 221,940.44 222,259.04 222,259.04 222,412.34 222,412.34 222,073.28 425,636.73
9 Bahan Pilihan M3 221,820.08 221,820.08 221,595.90 221,595.90 221,273.55 221,273.55 221,151.93 221,151.93 221,339.25 221,339.25 221,656.98 221,656.98 221,809.87 221,809.87 221,471.73 424,483.77
10 Bahan Tanah Timbunan M3 126,725.64 126,725.64 126,597.57 126,597.57 126,413.41 126,413.41 126,343.93 126,343.93 126,450.94 126,450.94 126,632.46 126,632.46 126,719.81 126,719.81 126,526.63 242,507.25
11 Batu Belah/Kerakal M3 357,984.88 357,984.88 357,623.08 357,623.08 357,102.85 357,102.85 356,906.57 356,906.57 357,208.88 357,208.88 357,721.66 357,721.66 357,968.40 357,968.40 357,422.68 685,054.16
12 Batu Kali M3 394,536.49 394,536.49 394,137.75 394,137.75 393,564.40 393,564.40 393,348.09 393,348.09 393,681.26 393,681.26 394,246.39 394,246.39 394,518.33 394,518.33 393,916.89 755,000.78
13 Chipping M3 235,075.06 235,075.06 234,837.48 234,837.48 234,495.87 234,495.87 234,366.98 234,366.98 234,565.49 234,565.49 234,902.21 234,902.21 235,064.24 235,064.24 234,705.89 449,849.03
14 Chipping (kg) Kg 301.25 301.25 300.95 300.95 300.51 300.51 300.34 300.34 300.60 300.60 301.03 301.03 301.24 301.24 300.78 576.48
15 Filler Cement Kg 2,108.75 2,108.75 2,106.62 2,106.62 2,103.55 2,103.55 2,102.39 2,102.39 2,104.18 2,104.18 2,107.20 2,107.20 2,108.65 2,108.65 2,105.44 4,035.38
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 421,749.36 421,749.36 421,323.12 421,323.12 420,710.23 420,710.23 420,478.99 420,478.99 420,835.14 420,835.14 421,439.26 421,439.26 421,729.95 421,729.95 421,087.03 807,076.43
18 Kapur M3 105,638.17 105,638.17 105,531.41 105,531.41 105,377.90 105,377.90 105,319.98 105,319.98 105,409.18 105,409.18 105,560.50 105,560.50 105,633.31 105,633.31 105,472.28 202,153.43
19 Pasir Beton (Kasar) M3 501,781.33 501,781.33 501,274.20 501,274.20 500,545.01 500,545.01 500,269.89 500,269.89 500,693.62 500,693.62 501,412.37 501,412.37 501,758.23 501,758.23 500,993.31 960,228.79
20 Pasir Halus (untuk HRS) M3 281,166.24 281,166.24 280,882.08 280,882.08 280,473.49 280,473.49 280,319.33 280,319.33 280,556.76 280,556.76 280,959.50 280,959.50 281,153.30 281,153.30 280,724.69 538,050.95
21 Pasir Pasang (Sedang) M3 280,965.41 280,965.41 280,681.45 280,681.45 280,273.15 280,273.15 280,119.10 280,119.10 280,356.36 280,356.36 280,758.82 280,758.82 280,952.48 280,952.48 280,524.17 537,666.63
22 Pasir Urug M3 215,393.42 215,393.42 215,175.74 215,175.74 214,862.72 214,862.72 214,744.63 214,744.63 214,926.52 214,926.52 215,235.05 215,235.05 215,383.51 215,383.51 215,055.16 412,185.46
23 Pasir Urug (ada unsur lempung) M3 135,461.88 135,461.88 135,324.97 135,324.97 135,128.12 135,128.12 135,053.85 135,053.85 135,168.24 135,168.24 135,362.28 135,362.28 135,455.64 135,455.64 135,249.15 259,225.26
24 Sirtu M3 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 73,906.56 73,906.56 73,831.86 73,831.86 73,724.46 73,724.46 73,683.94 73,683.94 73,746.35 73,746.35 73,852.21 73,852.21 73,903.15 73,903.15 73,790.49 141,430.54
26 Anti Pengelupas Liter 106,341.09 106,341.09 106,233.61 106,233.61 106,079.08 106,079.08 106,020.77 106,020.77 106,110.58 106,110.58 106,262.90 106,262.90 106,336.19 106,336.19 106,174.09 203,498.56
27 Arbocell Kg 150,022.27 150,022.27 149,870.65 149,870.65 149,652.64 149,652.64 149,570.38 149,570.38 149,697.07 149,697.07 149,911.96 149,911.96 150,015.37 150,015.37 149,786.67 287,088.61
28 Asbuton Curah Kg 15,363.73 15,363.73 15,348.20 15,348.20 15,325.87 15,325.87 15,317.45 15,317.45 15,330.42 15,330.42 15,352.43 15,352.43 15,363.02 15,363.02 15,339.60 29,400.64
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,439.15 9,439.15 9,429.61 9,429.61 9,415.90 9,415.90 9,410.72 9,410.72 9,418.69 9,418.69 9,432.21 9,432.21 9,438.72 9,438.72 9,424.33 18,063.14
30 Aspal Emulsi (CSS-1) Kg 10,342.90 10,342.90 10,332.45 10,332.45 10,317.42 10,317.42 10,311.75 10,311.75 10,320.48 10,320.48 10,335.30 10,335.30 10,342.42 10,342.42 10,326.66 19,792.59
31 Aspal Minyak (Drum) Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
32 Aspal Modifikasi (BNA) Kg 13,455.81 13,455.81 13,442.21 13,442.21 13,422.66 13,422.66 13,415.28 13,415.28 13,426.65 13,426.65 13,445.92 13,445.92 13,455.19 13,455.19 13,434.68 25,749.58
33 Aspal Modifikasi (JAP-57) Kg 17,171.22 17,171.22 17,153.87 17,153.87 17,128.92 17,128.92 17,119.50 17,119.50 17,134.00 17,134.00 17,158.60 17,158.60 17,170.43 17,170.43 17,144.26 32,859.54
34 Aspal Modifikasi (Retona) Kg 12,552.06 12,552.06 12,539.38 12,539.38 12,521.14 12,521.14 12,514.26 12,514.26 12,524.86 12,524.86 12,542.84 12,542.84 12,551.49 12,551.49 12,532.35 24,020.13
35 Aspal Modifikasi (Starbit) Kg 16,869.97 16,869.97 16,852.92 16,852.92 16,828.41 16,828.41 16,819.16 16,819.16 16,833.41 16,833.41 16,857.57 16,857.57 16,869.20 16,869.20 16,843.48 32,283.06
36 Aspal Minyak (Curah) Kg 10,142.07 10,142.07 10,131.82 10,131.82 10,117.08 10,117.08 10,111.52 10,111.52 10,120.08 10,120.08 10,134.61 10,134.61 10,141.60 10,141.60 10,126.14 19,408.27
37 Assetilline Botol 164,482.25 164,482.25 164,316.02 164,316.02 164,076.99 164,076.99 163,986.81 163,986.81 164,125.71 164,125.71 164,361.31 164,361.31 164,474.68 164,474.68 164,223.94 314,759.81
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
39 Bensin Liter 12,150.40 12,150.40 12,138.12 12,138.12 12,120.46 12,120.46 12,113.80 12,113.80 12,124.06 12,124.06 12,141.46 12,141.46 12,149.84 12,149.84 12,131.32 23,251.49
40 Beton B-0 M3 623,265.95 623,265.95 622,636.04 622,636.04 621,730.31 621,730.31 621,388.58 621,388.58 621,914.91 621,914.91 622,807.68 622,807.68 623,237.26 623,237.26 622,287.16 1,192,706.62
41 Beton K-125 (fc' 10 MPa) M3 644,393.61 644,393.61 643,742.35 643,742.35 642,805.91 642,805.91 642,452.60 642,452.60 642,996.77 642,996.77 643,919.80 643,919.80 644,363.95 644,363.95 643,381.64 1,233,137.36
42 Beton K-175 (fc' 15 MPa) M3 697,212.76 697,212.76 696,508.12 696,508.12 695,494.92 695,494.92 695,112.65 695,112.65 695,701.42 695,701.42 696,700.11 696,700.11 697,180.67 697,180.67 696,117.84 1,334,214.19
43 Beton K-250 (fc' 20 MPa) M3 776,441.48 776,441.48 775,656.77 775,656.77 774,528.44 774,528.44 774,102.73 774,102.73 774,758.40 774,758.40 775,870.58 775,870.58 776,405.74 776,405.74 775,222.13 1,485,829.44
44 Beton K-300 (fc' 25 MPa) M3 808,132.97 808,132.97 807,316.23 807,316.23 806,141.84 806,141.84 805,698.76 805,698.76 806,381.19 806,381.19 807,538.77 807,538.77 808,095.77 808,095.77 806,863.85 1,546,475.54
45 Beton K-350 (fc' 30 MPa) M3 839,824.46 839,824.46 838,975.69 838,975.69 837,755.25 837,755.25 837,294.79 837,294.79 838,003.99 838,003.99 839,206.95 839,206.95 839,785.80 839,785.80 838,505.57 1,607,121.64
46 Beton K-400 (fc' 35 MPa) M3 871,515.95 871,515.95 870,635.15 870,635.15 869,368.66 869,368.66 868,890.82 868,890.82 869,626.78 869,626.78 870,875.14 870,875.14 871,475.83 871,475.83 870,147.29 1,667,767.74
47 Beton K-450 (fc' 40 MPa) M3 913,771.27 913,771.27 912,847.76 912,847.76 911,519.86 911,519.86 911,018.86 911,018.86 911,790.50 911,790.50 913,099.39 913,099.39 913,729.21 913,729.21 912,336.25 1,748,629.20
48 Beton K-500 (fc' 45 MPa) M3 950,744.67 950,744.67 949,783.80 949,783.80 948,402.17 948,402.17 947,880.89 947,880.89 948,683.76 948,683.76 950,045.61 950,045.61 950,700.91 950,700.91 949,251.59 1,819,382.98
49 Bunker Oil Liter 4,418.33 4,418.33 4,413.86 4,413.86 4,407.44 4,407.44 4,405.02 4,405.02 4,408.75 4,408.75 4,415.08 4,415.08 4,418.12 4,418.12 4,411.39 8,455.09
50 Cat Kg 68,684.90 68,684.90 68,615.48 68,615.48 68,515.67 68,515.67 68,478.01 68,478.01 68,536.01 68,536.01 68,634.39 68,634.39 68,681.73 68,681.73 68,577.03 131,438.16
51 Cat Anti Karat Kg 77,119.88 77,119.88 77,041.94 77,041.94 76,929.87 76,929.87 76,887.59 76,887.59 76,952.71 76,952.71 77,063.18 77,063.18 77,116.33 77,116.33 76,998.77 147,579.69
52 Cat Marka (Non Thermoplas) Kg 75,312.39 75,312.39 75,236.27 75,236.27 75,126.83 75,126.83 75,085.53 75,085.53 75,149.13 75,149.13 75,257.01 75,257.01 75,308.92 75,308.92 75,194.11 144,120.79
53 Cat Marka (Thermoplastic) Kg 75,312.39 75,312.39 75,236.27 75,236.27 75,126.83 75,126.83 75,085.53 75,085.53 75,149.13 75,149.13 75,257.01 75,257.01 75,308.92 75,308.92 75,194.11 144,120.79
54 Cerucuk Diameter 10-15 cm M' 26,409.54 26,409.54 26,382.85 26,382.85 26,344.47 26,344.47 26,329.99 26,329.99 26,352.30 26,352.30 26,390.12 26,390.12 26,408.33 26,408.33 26,368.07 50,538.36
55 Cold Mix (Aspal Dingin) Kg 7,932.90 7,932.90 7,924.89 7,924.89 7,913.36 7,913.36 7,909.01 7,909.01 7,915.71 7,915.71 7,927.07 7,927.07 7,932.54 7,932.54 7,920.45 15,180.72
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,378,618.34 1,378,618.34 1,377,225.02 1,377,225.02 1,375,221.61 1,375,221.61 1,374,465.73 1,374,465.73 1,375,629.92 1,375,629.92 1,377,604.66 1,377,604.66 1,378,554.87 1,378,554.87 1,376,453.31 2,638,179.11
57 Curing Compound Liter 52,819.09 52,819.09 52,765.70 52,765.70 52,688.95 52,688.95 52,659.99 52,659.99 52,704.59 52,704.59 52,780.25 52,780.25 52,816.66 52,816.66 52,736.14 101,076.71
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 644,372.78 644,372.78 643,721.54 643,721.54 642,785.13 642,785.13 642,431.83 642,431.83 642,975.98 642,975.98 643,898.98 643,898.98 644,343.12 644,343.12 643,360.83 1,233,097.48
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 750,010.95 750,010.95 749,252.95 749,252.95 748,163.03 748,163.03 747,751.81 747,751.81 748,385.16 748,385.16 749,459.48 749,459.48 749,976.43 749,976.43 748,833.11 1,435,250.91
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 950,743.56 950,743.56 949,782.69 949,782.69 948,401.06 948,401.06 947,879.78 947,879.78 948,682.65 948,682.65 950,044.50 950,044.50 950,699.80 950,699.80 949,250.49 1,819,380.86
61 Kerosen/Minyak Tanah Liter 16,869.97 16,869.97 16,852.92 16,852.92 16,828.41 16,828.41 16,819.16 16,819.16 16,833.41 16,833.41 16,857.57 16,857.57 16,869.20 16,869.20 16,843.48 32,283.06
62 Minyak Fluks Liter 8,434.99 8,434.99 8,426.46 8,426.46 8,414.20 8,414.20 8,409.58 8,409.58 8,416.70 8,416.70 8,428.79 8,428.79 8,434.60 8,434.60 8,421.74 16,141.53
63 Minyak Pelumas/Olie Liter 51,513.67 51,513.67 51,461.61 51,461.61 51,386.75 51,386.75 51,358.51 51,358.51 51,402.01 51,402.01 51,475.79 51,475.79 51,511.30 51,511.30 51,432.77 98,578.62
64 Oxygen (Isi 6 M3) Botol 181,251.81 181,251.81 181,068.63 181,068.63 180,805.23 180,805.23 180,705.85 180,705.85 180,858.91 180,858.91 181,118.54 181,118.54 181,243.47 181,243.47 180,967.17 346,850.70
65 Polytene 125 Mikron Kg 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
66 Sand Sheet Ton 1,457,846.97 1,457,846.97 1,456,373.58 1,456,373.58 1,454,255.03 1,454,255.03 1,453,455.71 1,453,455.71 1,454,686.81 1,454,686.81 1,456,775.03 1,456,775.03 1,457,779.86 1,457,779.86 1,455,557.51 2,789,794.18
67 Seal Coat M2 116,181.91 116,181.91 116,064.49 116,064.49 115,895.65 115,895.65 115,831.95 115,831.95 115,930.06 115,930.06 116,096.48 116,096.48 116,176.56 116,176.56 115,999.45 222,330.34
68 Seal Guard Kg 38,057.86 38,057.86 38,019.40 38,019.40 37,964.09 37,964.09 37,943.22 37,943.22 37,975.36 37,975.36 38,029.88 38,029.88 38,056.11 38,056.11 37,998.09 72,829.04
69 Semen/PC (50 kg) Zak 71,797.81 71,797.81 71,725.25 71,725.25 71,620.91 71,620.91 71,581.54 71,581.54 71,642.17 71,642.17 71,745.02 71,745.02 71,794.50 71,794.50 71,685.05 137,395.15
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 42,275.35 42,275.35 42,232.63 42,232.63 42,171.19 42,171.19 42,148.01 42,148.01 42,183.71 42,183.71 42,244.27 42,244.27 42,273.41 42,273.41 42,208.96 80,899.80
72 Solar Liter 12,953.73 12,953.73 12,940.64 12,940.64 12,921.81 12,921.81 12,914.71 12,914.71 12,925.65 12,925.65 12,944.21 12,944.21 12,953.13 12,953.13 12,933.39 24,788.78
73 Thinner Liter 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 18,476.64 18,476.64 18,457.97 18,457.97 18,431.11 18,431.11 18,420.98 18,420.98 18,436.59 18,436.59 18,463.05 18,463.05 18,475.79 18,475.79 18,447.62 35,357.63
75 Baja Prategang Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,869.97 16,869.97 16,852.92 16,852.92 16,828.41 16,828.41 16,819.16 16,819.16 16,833.41 16,833.41 16,857.57 16,857.57 16,869.20 16,869.20 16,843.48 32,283.06
77 Baja Tulangan (Polos) U25 Kg 12,552.06 12,552.06 12,539.38 12,539.38 12,521.14 12,521.14 12,514.26 12,514.26 12,524.86 12,524.86 12,542.84 12,542.84 12,551.49 12,551.49 12,532.35 24,020.13
78 Baja Tulangan (Polos) U32 Kg 12,552.06 12,552.06 12,539.38 12,539.38 12,521.14 12,521.14 12,514.26 12,514.26 12,524.86 12,524.86 12,542.84 12,542.84 12,551.49 12,551.49 12,532.35 24,020.13
79 Baja Tulangan (Polos) U36 Kg 12,552.06 12,552.06 12,539.38 12,539.38 12,521.14 12,521.14 12,514.26 12,514.26 12,524.86 12,524.86 12,542.84 12,542.84 12,551.49 12,551.49 12,532.35 24,020.13
80 Baja Tulangan (Ulir) D16 Kg 16,920.18 16,920.18 16,903.08 16,903.08 16,878.49 16,878.49 16,869.22 16,869.22 16,883.51 16,883.51 16,907.74 16,907.74 16,919.40 16,919.40 16,893.61 32,379.14
81 Baja Tulangan (Ulir) D19 Kg 16,920.18 16,920.18 16,903.08 16,903.08 16,878.49 16,878.49 16,869.22 16,869.22 16,883.51 16,883.51 16,907.74 16,907.74 16,919.40 16,919.40 16,893.61 32,379.14
82 Baja Tulangan (Ulir) D24 Kg 16,920.18 16,920.18 16,903.08 16,903.08 16,878.49 16,878.49 16,869.22 16,869.22 16,883.51 16,883.51 16,907.74 16,907.74 16,919.40 16,919.40 16,893.61 32,379.14
83 Baja Tulangan (Ulir) D32 Kg 16,920.18 16,920.18 16,903.08 16,903.08 16,878.49 16,878.49 16,869.22 16,869.22 16,883.51 16,883.51 16,907.74 16,907.74 16,919.40 16,919.40 16,893.61 32,379.14
84 Baja Tulangan (Ulir) D36 Kg 16,920.18 16,920.18 16,903.08 16,903.08 16,878.49 16,878.49 16,869.22 16,869.22 16,883.51 16,883.51 16,907.74 16,907.74 16,919.40 16,919.40 16,893.61 32,379.14
85 Besi Beton Kg 8,836.65 8,836.65 8,827.72 8,827.72 8,814.88 8,814.88 8,810.04 8,810.04 8,817.50 8,817.50 8,830.16 8,830.16 8,836.25 8,836.25 8,822.78 16,910.17
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,732,962.60 13,732,962.60 13,719,083.27 13,719,083.27 13,699,126.45 13,699,126.45 13,691,596.88 13,691,596.88 13,703,193.83 13,703,193.83 13,722,864.95 13,722,864.95 13,732,330.44 13,732,330.44 13,711,395.90 26,279,945.76
87 Box Culvert Type DUB 200×200 M' 14,578,067.99 14,578,067.99 14,563,334.55 14,563,334.55 14,542,149.62 14,542,149.62 14,534,156.69 14,534,156.69 14,546,467.30 14,546,467.30 14,567,348.95 14,567,348.95 14,577,396.93 14,577,396.93 14,555,174.11 27,897,173.20
88 Box Culvert Type uk 300×200 M' 15,740,087.91 15,740,087.91 15,724,180.06 15,724,180.06 15,701,306.47 15,701,306.47 15,692,676.42 15,692,676.42 15,705,968.31 15,705,968.31 15,728,514.45 15,728,514.45 15,739,363.35 15,739,363.35 15,715,369.15 30,120,860.91
89 Casing M2 14,158.73 14,158.73 14,144.42 14,144.42 14,123.84 14,123.84 14,116.08 14,116.08 14,128.04 14,128.04 14,148.32 14,148.32 14,158.08 14,158.08 14,136.49 27,094.71
90 Ducting (Kabel Prestress) M' 204,648.86 204,648.86 204,442.03 204,442.03 204,144.63 204,144.63 204,032.42 204,032.42 204,205.24 204,205.24 204,498.38 204,498.38 204,639.44 204,639.44 204,327.47 391,624.23
91 Ducting (Strand Prestress) M' 178,239.31 178,239.31 178,059.18 178,059.18 177,800.16 177,800.16 177,702.43 177,702.43 177,852.95 177,852.95 178,108.26 178,108.26 178,231.11 178,231.11 177,959.40 341,085.87
92 Expansion Cap M2 10,342.90 10,342.90 10,332.45 10,332.45 10,317.42 10,317.42 10,311.75 10,311.75 10,320.48 10,320.48 10,335.30 10,335.30 10,342.42 10,342.42 10,326.66 19,792.59
93 Expansion Join Baja Siku M' 2,298,835.28 2,298,835.28 2,296,511.94 2,296,511.94 2,293,171.26 2,293,171.26 2,291,910.85 2,291,910.85 2,293,852.12 2,293,852.12 2,297,144.98 2,297,144.98 2,298,729.46 2,298,729.46 2,295,225.11 4,399,143.01
94 Expansion Join Tipe Rubber M' 1,664,303.32 1,664,303.32 1,662,621.28 1,662,621.28 1,660,202.70 1,660,202.70 1,659,290.19 1,659,290.19 1,660,695.63 1,660,695.63 1,663,079.58 1,663,079.58 1,664,226.71 1,664,226.71 1,661,689.64 3,184,877.31
95 Expansion Join Tipe Torma M' 1,908,717.12 1,908,717.12 1,906,788.06 1,906,788.06 1,904,014.30 1,904,014.30 1,902,967.78 1,902,967.78 1,904,579.62 1,904,579.62 1,907,313.67 1,907,313.67 1,908,629.26 1,908,629.26 1,905,719.61 3,652,597.32
96 Expansion Tipe Joint Asphaltic Plug M' 2,264,392.42 2,264,392.42 2,262,103.89 2,262,103.89 2,258,813.26 2,258,813.26 2,257,571.73 2,257,571.73 2,259,483.92 2,259,483.92 2,262,727.44 2,262,727.44 2,264,288.18 2,264,288.18 2,260,836.34 4,333,231.77
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 43,882.02 43,882.02 43,837.67 43,837.67 43,773.90 43,773.90 43,749.84 43,749.84 43,786.89 43,786.89 43,849.75 43,849.75 43,880.00 43,880.00 43,813.10 83,974.38
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 33,840.37 33,840.37 33,806.16 33,806.16 33,756.99 33,756.99 33,738.43 33,738.43 33,767.01 33,767.01 33,815.48 33,815.48 33,838.81 33,838.81 33,787.22 64,758.28
99 Glass Bead Kg 73,906.56 73,906.56 73,831.86 73,831.86 73,724.46 73,724.46 73,683.94 73,683.94 73,746.35 73,746.35 73,852.21 73,852.21 73,903.15 73,903.15 73,790.49 141,430.54
100 Joint Sealent Kg 47,597.43 47,597.43 47,549.32 47,549.32 47,480.15 47,480.15 47,454.06 47,454.06 47,494.25 47,494.25 47,562.43 47,562.43 47,595.24 47,595.24 47,522.68 91,084.34
101 Joint Socket Pile 16×16×16 Set 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
102 Joint Socket Pile 35×35 Set 826,227.09 826,227.09 825,392.05 825,392.05 824,191.38 824,191.38 823,738.37 823,738.37 824,436.08 824,436.08 825,619.57 825,619.57 826,189.05 826,189.05 824,929.55 1,581,101.15
103 Kawat Beton Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
104 Kawat Bronjong Kg 35,949.11 35,949.11 35,912.78 35,912.78 35,860.54 35,860.54 35,840.83 35,840.83 35,871.19 35,871.19 35,922.68 35,922.68 35,947.46 35,947.46 35,892.66 68,793.66
105 Kawat Las Dos 145,302.70 145,302.70 145,155.85 145,155.85 144,944.69 144,944.69 144,865.02 144,865.02 144,987.73 144,987.73 145,195.86 145,195.86 145,296.01 145,296.01 145,074.51 278,057.05
106 Kayu Acuan (Kelas III/Meranti) M3 4,542,441.48 4,542,441.48 4,537,850.62 4,537,850.62 4,531,249.52 4,531,249.52 4,528,758.97 4,528,758.97 4,532,594.88 4,532,594.88 4,539,101.48 4,539,101.48 4,542,232.38 4,542,232.38 4,535,307.88 8,692,597.44
107 Kayu Perancah (Gelam) M3 3,017,933.01 3,017,933.01 3,014,882.91 3,014,882.91 3,010,497.23 3,010,497.23 3,008,842.54 3,008,842.54 3,011,391.07 3,011,391.07 3,015,713.96 3,015,713.96 3,017,794.08 3,017,794.08 3,013,193.54 5,775,237.15
108 Kerb Pracetak Type 1 (Peninggi) Buah 58,141.16 58,141.16 58,082.40 58,082.40 57,997.91 57,997.91 57,966.03 57,966.03 58,015.13 58,015.13 58,098.41 58,098.41 58,138.49 58,138.49 58,049.86 111,261.25
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 100,316.10 100,316.10 100,214.71 100,214.71 100,068.93 100,068.93 100,013.93 100,013.93 100,098.64 100,098.64 100,242.34 100,242.34 100,311.48 100,311.48 100,158.56 191,968.89
110 Marmer Nama Jembatan Buah 633,829.04 633,829.04 633,188.46 633,188.46 632,267.37 632,267.37 631,919.86 631,919.86 632,455.10 632,455.10 633,363.00 633,363.00 633,799.87 633,799.87 632,833.66 1,212,920.57
111 Mata Kucing Buah 166,390.17 166,390.17 166,222.00 166,222.00 165,980.20 165,980.20 165,888.97 165,888.97 166,029.48 166,029.48 166,267.82 166,267.82 166,382.51 166,382.51 166,128.86 318,410.87
112 Matras Concrete (Tebal=10 cm) M2 154,942.68 154,942.68 154,786.09 154,786.09 154,560.93 154,560.93 154,475.97 154,475.97 154,606.82 154,606.82 154,828.76 154,828.76 154,935.55 154,935.55 154,699.36 296,504.51
113 Mini Pile 16×16×16 M' 143,394.78 143,394.78 143,249.86 143,249.86 143,041.48 143,041.48 142,962.86 142,962.86 143,083.95 143,083.95 143,289.35 143,289.35 143,388.18 143,388.18 143,169.59 274,405.99
114 Mini Timber Pile Buah 33,237.87 33,237.87 33,204.27 33,204.27 33,155.97 33,155.97 33,137.75 33,137.75 33,165.82 33,165.82 33,213.43 33,213.43 33,236.34 33,236.34 33,185.67 63,605.31
115 Multipleks 12 mm Lbr 169,000.99 169,000.99 168,830.19 168,830.19 168,584.60 168,584.60 168,491.94 168,491.94 168,634.65 168,634.65 168,876.73 168,876.73 168,993.22 168,993.22 168,735.59 323,407.05
116 Paku Kg 22,192.05 22,192.05 22,169.62 22,169.62 22,137.37 22,137.37 22,125.20 22,125.20 22,143.94 22,143.94 22,175.73 22,175.73 22,191.03 22,191.03 22,157.20 42,467.59
117 Paving Block (Model Bata 8 cm) M2 100,316.10 100,316.10 100,214.71 100,214.71 100,068.93 100,068.93 100,013.93 100,013.93 100,098.64 100,098.64 100,242.34 100,242.34 100,311.48 100,311.48 100,158.56 191,968.89
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 70,226,591.07 70,226,591.07 70,155,616.01 70,155,616.01 70,053,562.32 70,053,562.32 70,015,058.15 70,015,058.15 70,074,361.77 70,074,361.77 70,174,954.48 70,174,954.48 70,223,358.37 70,223,358.37 70,116,304.90 134,388,409.69
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 99,487,662.32 99,487,662.32 99,387,114.32 99,387,114.32 99,242,538.27 99,242,538.27 99,187,990.70 99,187,990.70 99,272,004.15 99,272,004.15 99,414,510.48 99,414,510.48 99,483,082.66 99,483,082.66 99,331,423.58 190,383,564.38
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 190,148,913.79 190,148,913.79 189,956,738.27 189,956,738.27 189,680,412.78 189,680,412.78 189,576,157.02 189,576,157.02 189,736,730.37 189,736,730.37 190,009,100.05 190,009,100.05 190,140,160.78 190,140,160.78 189,850,297.61 363,876,556.43
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 249,350,273.59 249,350,273.59 249,098,265.74 249,098,265.74 248,735,908.50 248,735,908.50 248,599,193.52 248,599,193.52 248,809,760.12 248,809,760.12 249,166,929.94 249,166,929.94 249,338,795.40 249,338,795.40 248,958,685.62 477,166,643.19
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 317,855,625.17 317,855,625.17 317,534,381.85 317,534,381.85 317,072,472.23 317,072,472.23 316,898,196.82 316,898,196.82 317,166,613.51 317,166,613.51 317,621,910.53 317,621,910.53 317,840,993.52 317,840,993.52 317,356,454.13 608,261,220.25
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 383,492,177.34 383,492,177.34 383,104,597.91 383,104,597.91 382,547,304.88 382,547,304.88 382,337,041.94 382,337,041.94 382,660,886.14 382,660,886.14 383,210,201.09 383,210,201.09 383,474,524.28 383,474,524.28 382,889,928.47 733,865,948.16
124 Pelat Rambu (Eng. Grade) Buah 221,820.08 221,820.08 221,595.90 221,595.90 221,273.55 221,273.55 221,151.93 221,151.93 221,339.25 221,339.25 221,656.98 221,656.98 221,809.87 221,809.87 221,471.73 424,483.77
125 Pelat Rambu (High L Grade) Buah 258,773.36 258,773.36 258,511.83 258,511.83 258,135.78 258,135.78 257,993.90 257,993.90 258,212.42 258,212.42 258,583.09 258,583.09 258,761.45 258,761.45 258,366.97 495,199.04
126 Pemantul Cahaya (Reflector) Buah 15,363.73 15,363.73 15,348.20 15,348.20 15,325.87 15,325.87 15,317.45 15,317.45 15,330.42 15,330.42 15,352.43 15,352.43 15,363.02 15,363.02 15,339.60 29,400.64
127 Pipa Baja D10" Kg 23,798.71 23,798.71 23,774.66 23,774.66 23,740.08 23,740.08 23,727.03 23,727.03 23,747.13 23,747.13 23,781.22 23,781.22 23,797.62 23,797.62 23,761.34 45,542.17
128 Pipa Drainase Baja Dia 3" M' 290,705.81 290,705.81 290,412.01 290,412.01 289,989.55 289,989.55 289,830.16 289,830.16 290,075.65 290,075.65 290,492.06 290,492.06 290,692.43 290,692.43 290,249.28 556,306.25
129 Pipa Galvanis Dia 1,5" M' 251,041.29 251,041.29 250,787.57 250,787.57 250,422.76 250,422.76 250,285.11 250,285.11 250,497.11 250,497.11 250,856.70 250,856.70 251,029.73 251,029.73 250,647.04 480,402.64
130 Pipa Galvanis Dia 2" M' 332,780.33 332,780.33 332,444.00 332,444.00 331,960.41 331,960.41 331,777.95 331,777.95 332,058.97 332,058.97 332,535.64 332,535.64 332,765.01 332,765.01 332,257.72 636,821.73
131 Pipa Galvanis Dia 3" M' 254,857.12 254,857.12 254,599.54 254,599.54 254,229.18 254,229.18 254,089.45 254,089.45 254,304.66 254,304.66 254,669.72 254,669.72 254,845.38 254,845.38 254,456.88 487,704.76
132 Pipa Porus M' 47,497.01 47,497.01 47,449.01 47,449.01 47,379.99 47,379.99 47,353.94 47,353.94 47,394.05 47,394.05 47,462.09 47,462.09 47,494.83 47,494.83 47,422.42 90,892.18
133 Pipa PVC Dia 4" M' 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79 200,517.64 384,322.11
134 Plastik Filter M2 38,057.86 38,057.86 38,019.40 38,019.40 37,964.09 37,964.09 37,943.22 37,943.22 37,975.36 37,975.36 38,029.88 38,029.88 38,056.11 38,056.11 37,998.09 72,829.04
135 Rel Pengaman M' 179,544.73 179,544.73 179,363.27 179,363.27 179,102.36 179,102.36 179,003.91 179,003.91 179,155.53 179,155.53 179,412.71 179,412.71 179,536.46 179,536.46 179,262.77 343,583.96
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,169,800.06 2,169,800.06 2,167,607.13 2,167,607.13 2,164,453.97 2,164,453.97 2,163,264.30 2,163,264.30 2,165,096.61 2,165,096.61 2,168,204.64 2,168,204.64 2,169,700.18 2,169,700.18 2,166,392.53 4,152,216.06
137 Strip Bearing Buah 332,780.33 332,780.33 332,444.00 332,444.00 331,960.41 331,960.41 331,777.95 331,777.95 332,058.97 332,058.97 332,535.64 332,535.64 332,765.01 332,765.01 332,257.72 636,821.73
138 Tiang Pancang Baja Diameter 400 M' 768,788.84 768,788.84 768,011.86 768,011.86 766,894.65 766,894.65 766,473.13 766,473.13 767,122.35 767,122.35 768,223.56 768,223.56 768,753.45 768,753.45 767,581.51 1,471,185.03
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 939,597.33 939,597.33 938,647.72 938,647.72 937,282.29 937,282.29 936,767.12 936,767.12 937,560.58 937,560.58 938,906.46 938,906.46 939,554.08 939,554.08 938,121.76 1,798,050.98
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,964,849.95 1,964,849.95 1,962,864.16 1,962,864.16 1,960,008.83 1,960,008.83 1,958,931.53 1,958,931.53 1,960,590.77 1,960,590.77 1,963,405.22 1,963,405.22 1,964,759.50 1,964,759.50 1,961,764.28 3,760,015.35
HARGA SATUAN DASAR UPAH KABUPATEN TUBAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
2 Tukang OH 118,000 118,000 118,319.27 118,319.27 118,482.38 118,482.38 118,485.68 118,485.68 118,329.19 118,329.19 118,160.17 118,160.17 118,134.59 118,134.59 118,273.27 118,273.27 118,445.28 118,445.28
3 Mandor OH 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12 136,314.95 136,314.95 136,513.20 136,513.20
4 Operator OH 280,000 280,000 280,757.58 280,757.58 281,144.63 281,144.63 281,152.46 281,152.46 280,781.13 280,781.13 280,380.06 280,380.06 280,319.36 280,319.36 280,648.44 280,648.44 281,056.59 281,056.59
5 Pembantu Operator OH 175,000 175,000 175,473.49 175,473.49 175,715.40 175,715.40 175,720.29 175,720.29 175,488.20 175,488.20 175,237.53 175,237.53 175,199.60 175,199.60 175,405.27 175,405.27 175,660.37 175,660.37
6 Sopir OH 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
7 Pembantu Sopir OH 114,000 114,000 114,308.44 114,308.44 114,466.03 114,466.03 114,469.22 114,469.22 114,318.03 114,318.03 114,154.74 114,154.74 114,130.03 114,130.03 114,264.01 114,264.01 114,430.18 114,430.18
8 Mekanik OH 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
9 Pembantu Mekanik OH 114,000 114,000 114,308.44 114,308.44 114,466.03 114,466.03 114,469.22 114,469.22 114,318.03 114,318.03 114,154.74 114,154.74 114,130.03 114,130.03 114,264.01 114,264.01 114,430.18 114,430.18
10 Kepala Tukang OH 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
11 Pemasak Aspal OH 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33

HARGA SATUAN DASAR ALAT KABUPATEN TUBAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 412,613 461,000 413,729.55 462,247.31 414,299.92 462,884.55 414,311.45 462,897.44 413,764.25 462,286.07 413,173.22 461,625.73 413,083.78 461,525.80 413,568.71 462,067.60 414,170.18 462,739.61
2 Asphalt Distribution Unit/Jam 254,051 327,000 254,737.94 327,884.75 255,089.12 328,336.77 255,096.22 328,345.91 254,759.30 327,912.24 254,395.40 327,443.85 254,340.33 327,372.97 254,638.91 327,757.28 255,009.24 328,233.95
3 Asphalt Finisher Unit/Jam 186,596 885,000 187,100.63 887,394.50 187,358.56 888,617.86 187,363.78 888,642.59 187,116.32 887,468.92 186,849.04 886,201.25 186,808.59 886,009.41 187,027.89 887,049.52 187,299.89 888,339.59
4 Asphalt Liquid Mixer Unit/Jam 66,579 122,000 66,758.91 122,330.09 66,850.94 122,498.73 66,852.80 122,502.14 66,764.51 122,340.35 66,669.14 122,165.60 66,654.71 122,139.15 66,732.96 122,282.53 66,830.01 122,460.37
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 89,356 89,356 89,597.48 89,597.48 89,721.00 89,721.00 89,723.50 89,723.50 89,605.00 89,605.00 89,477.00 89,477.00 89,457.63 89,457.63 89,562.65 89,562.65 89,692.91 89,692.91
6 Asphalt Mixing Plant Unit/Jam 998,682 5,122,710 1,001,383.63 5,136,570.10 1,002,764.13 5,143,651.31 1,002,792.04 5,143,794.50 1,001,467.60 5,137,000.84 1,000,037.09 5,129,663.08 999,820.61 5,128,552.64 1,000,994.33 5,134,573.19 1,002,450.12 5,142,040.61
7 Asphalt Sprayer Unit/Jam 82,347 82,347 82,570.23 82,570.23 82,684.06 82,684.06 82,686.36 82,686.36 82,577.15 82,577.15 82,459.20 82,459.20 82,441.35 82,441.35 82,538.13 82,538.13 82,658.17 82,658.17
8 Asphalt Tanker Unit/Jam 385,456 447,000 386,498.94 448,209.43 387,031.77 448,827.32 387,042.54 448,839.82 386,531.36 448,247.01 385,979.23 447,606.73 385,895.67 447,509.84 386,348.69 448,035.18 386,910.57 448,686.78
9 Blending Equipment Unit/Jam 125,273 198,000 125,612.16 198,535.72 125,785.32 198,809.42 125,788.83 198,814.95 125,622.69 198,552.37 125,443.25 198,268.75 125,416.09 198,225.83 125,563.32 198,458.54 125,745.94 198,747.16
10 Bore Pile Machine Unit/Jam 345,158 600,000 346,092.24 601,623.39 346,569.36 602,452.78 346,579.00 602,469.55 346,121.26 601,673.84 345,626.86 600,814.40 345,552.04 600,684.34 345,957.69 601,389.50 346,460.83 602,264.13
11 Bore Pile Machine Dia 60 Unit/Jam 226,017 683,000 226,628.93 684,847.96 226,941.35 685,792.08 226,947.67 685,811.18 226,647.93 684,905.39 226,324.18 683,927.06 226,275.19 683,779.01 226,540.82 684,581.72 226,870.29 685,577.33
12 Bore Pile Machine Dia 80 Unit/Jam 893,557 893,557 895,974.83 895,974.83 897,210.01 897,210.01 897,234.98 897,234.98 896,049.96 896,049.96 894,770.03 894,770.03 894,576.34 894,576.34 895,626.51 895,626.51 896,929.05 896,929.05
13 Bulldozer 100-150 HP Unit/Jam 350,415 508,000 351,362.68 509,374.47 351,847.06 510,076.69 351,856.86 510,090.89 351,392.14 509,417.19 350,890.21 508,689.53 350,814.25 508,579.41 351,226.08 509,176.45 351,736.88 509,916.96
14 Cement Tanker Unit/Jam 325,886 420,000 326,767.29 421,136.37 327,217.77 421,716.95 327,226.88 421,728.69 326,794.69 421,171.69 326,327.89 420,570.08 326,257.25 420,479.04 326,640.25 420,972.65 327,115.30 421,584.89
15 Cold Milling Unit/Jam 508,977 1,083,000 510,354.29 1,085,930.22 511,057.86 1,087,427.27 511,072.08 1,087,457.54 510,397.09 1,086,021.29 509,668.03 1,084,470.00 509,557.70 1,084,235.24 510,155.88 1,085,508.05 510,897.82 1,087,086.75
16 Cold Recycler Unit/Jam 4,286,446 4,286,446 4,298,043.95 4,298,043.95 4,303,969.18 4,303,969.18 4,304,088.99 4,304,088.99 4,298,404.38 4,298,404.38 4,292,264.48 4,292,264.48 4,291,335.31 4,291,335.31 4,296,373.03 4,296,373.03 4,302,621.42 4,302,621.42
17 Compressor 4000-6500 L\M Unit/Jam 130,529 130,529 130,882.60 130,882.60 131,063.03 131,063.03 131,066.68 131,066.68 130,893.57 130,893.57 130,706.60 130,706.60 130,678.31 130,678.31 130,831.72 130,831.72 131,021.99 131,021.99
18 Concrete Breaker Unit/Jam 475,688 907,000 476,974.83 909,454.03 477,632.39 910,707.79 477,645.68 910,733.14 477,014.83 909,530.29 476,333.46 908,231.11 476,230.34 908,034.50 476,789.40 909,100.47 477,482.82 910,422.61
19 Concrete Mixer (350) Unit/Jam 88,480 88,480 88,719.08 88,719.08 88,841.38 88,841.38 88,843.86 88,843.86 88,726.52 88,726.52 88,599.78 88,599.78 88,580.60 88,580.60 88,684.59 88,684.59 88,813.56 88,813.56
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 100,744 100,744 101,016.77 101,016.77 101,156.03 101,156.03 101,158.85 101,158.85 101,025.24 101,025.24 100,880.93 100,880.93 100,859.10 100,859.10 100,977.50 100,977.50 101,124.35 101,124.35
21 Concrete Pan Mixer Unit/Jam 268,067 574,000 268,792.45 575,553.04 269,163.00 576,346.50 269,170.49 576,362.54 268,814.99 575,601.31 268,431.01 574,779.11 268,372.90 574,654.69 268,687.95 575,329.29 269,078.72 576,166.02
22 Concrete Pump Unit/Jam 204,116 219,000 204,668.76 219,592.54 204,950.91 219,895.27 204,956.62 219,901.39 204,685.92 219,610.95 204,393.55 219,297.26 204,349.30 219,249.79 204,589.19 219,507.17 204,886.73 219,826.41
23 Concrete Vibrator Unit/Jam 76,215 76,215 76,421.38 76,421.38 76,526.74 76,526.74 76,528.87 76,528.87 76,427.79 76,427.79 76,318.62 76,318.62 76,302.10 76,302.10 76,391.67 76,391.67 76,502.77 76,502.77
24 Crane 10-15 Ton Unit/Jam 273,323 273,323 274,062.89 274,062.89 274,440.71 274,440.71 274,448.35 274,448.35 274,085.87 274,085.87 273,694.36 273,694.36 273,635.11 273,635.11 273,956.34 273,956.34 274,354.77 274,354.77
25 Crane On Track 35 Ton Unit/Jam 226,893 431,000 227,507.33 432,166.14 227,820.97 432,761.92 227,827.31 432,773.96 227,526.41 432,202.38 227,201.41 431,585.01 227,152.23 431,491.59 227,418.89 431,998.13 227,749.63 432,626.40
26 Crane On Track 75-100 Ton Unit/Jam 356,547 541,000 357,511.52 542,463.76 358,004.39 543,211.59 358,014.35 543,226.71 357,541.50 542,509.25 357,030.79 541,734.32 356,953.50 541,617.05 357,372.54 542,252.87 357,892.28 543,041.49
27 Dump Truck 10 Ton Unit/Jam 337,274 363,000 338,186.58 363,982.15 338,652.80 364,483.93 338,662.22 364,494.08 338,214.94 364,012.68 337,731.83 363,492.71 337,658.72 363,414.03 338,055.10 363,840.65 338,546.75 364,369.80
28 Dump Truck 3-4 M3 Unit/Jam 183,968 241,000 184,465.41 241,652.06 184,719.71 241,985.20 184,724.85 241,991.94 184,480.87 241,672.33 184,217.36 241,327.12 184,177.48 241,274.88 184,393.69 241,558.12 184,661.86 241,909.42
29 Excavator 80-140 HP Unit/Jam 266,315 423,000 267,035.63 424,144.49 267,403.77 424,729.21 267,411.21 424,741.04 267,058.03 424,180.06 266,676.56 423,574.16 266,618.83 423,482.46 266,931.82 423,979.60 267,320.03 424,596.21
30 Flat Bed Truck 3-4 M3 Unit/Jam 323,257 432,000 324,132.07 433,168.84 324,578.91 433,766.00 324,587.95 433,778.08 324,159.25 433,205.17 323,696.22 432,586.37 323,626.15 432,492.73 324,006.06 433,000.44 324,477.27 433,630.17
31 Fulvi Mixer Unit/Jam 809,458 1,264,000 811,647.78 1,267,419.95 812,766.71 1,269,167.20 812,789.34 1,269,202.53 811,715.85 1,267,526.23 810,556.38 1,265,715.68 810,380.92 1,265,441.68 811,332.25 1,266,927.22 812,512.20 1,268,769.76
32 Generator Set Unit/Jam 360,051 382,000 361,025.15 383,033.56 361,522.86 383,561.61 361,532.92 383,572.28 361,055.43 383,065.68 360,539.69 382,518.50 360,461.64 382,435.70 360,884.80 382,884.65 361,409.65 383,441.50
33 Hot Recycler Unit/Jam 2,644,754 7,756,000 2,651,909.81 7,776,985.05 2,655,565.70 7,787,706.31 2,655,639.62 7,787,923.10 2,652,132.19 7,777,637.21 2,648,343.85 7,766,527.53 2,647,770.55 7,764,846.28 2,650,878.84 7,773,961.65 2,654,734.12 7,785,267.63
34 Jack Hammer Unit/Jam 49,934 49,934 50,069.18 50,069.18 50,138.21 50,138.21 50,139.60 50,139.60 50,073.38 50,073.38 50,001.85 50,001.85 49,991.03 49,991.03 50,049.72 50,049.72 50,122.51 50,122.51
35 Launching Gantry Unit/Jam 63,546,807 63,546,807 63,718,743.08 63,718,743.08 63,806,585.01 63,806,585.01 63,808,361.22 63,808,361.22 63,724,086.44 63,724,086.44 63,633,062.12 63,633,062.12 63,619,287.19 63,619,287.19 63,693,971.65 63,693,971.65 63,786,604.33 63,786,604.33
36 Motor Grader > 100 HP Unit/Jam 249,670 420,000 250,345.91 421,136.37 250,691.03 421,716.95 250,698.01 421,728.69 250,366.90 421,171.69 250,009.27 420,570.08 249,955.15 420,479.04 250,248.58 420,972.65 250,612.53 421,584.89
37 Pedestrian Roller Unit/Jam 82,347 82,347 82,570.23 82,570.23 82,684.06 82,684.06 82,686.36 82,686.36 82,577.15 82,577.15 82,459.20 82,459.20 82,441.35 82,441.35 82,538.13 82,538.13 82,658.17 82,658.17
38 Pile Driver + Hammer Unit/Jam 93,736 274,000 93,989.52 274,741.35 94,119.09 275,120.10 94,121.71 275,127.76 93,997.40 274,764.39 93,863.13 274,371.91 93,842.81 274,312.52 93,952.98 274,634.54 94,089.62 275,033.95
39 Rock Drill Breaker Unit/Jam 91,108 296,000 91,354.30 296,800.87 91,480.24 297,210.04 91,482.78 297,218.31 91,361.96 296,825.76 91,231.45 296,401.77 91,211.70 296,337.61 91,318.78 296,685.49 91,451.59 297,116.97
40 Split Form Paver Unit/Jam 192,728 192,728 193,249.47 193,249.47 193,515.88 193,515.88 193,521.27 193,521.27 193,265.68 193,265.68 192,989.61 192,989.61 192,947.84 192,947.84 193,174.34 193,174.34 193,455.29 193,455.29
41 Stone Crusher Unit/Jam 515,985 643,000 517,381.54 644,739.74 518,094.80 645,628.57 518,109.22 645,646.54 517,424.93 644,793.80 516,685.83 643,872.77 516,573.98 643,733.39 517,180.40 644,489.08 517,932.56 645,426.39
42 Tamper Unit/Jam 77,091 77,091 77,299.79 77,299.79 77,406.35 77,406.35 77,408.51 77,408.51 77,306.27 77,306.27 77,195.85 77,195.85 77,179.13 77,179.13 77,269.74 77,269.74 77,382.11 77,382.11
43 Tandem Roller 6-8 T Unit/Jam 372,315 435,000 373,322.84 436,176.96 373,837.50 436,778.27 373,847.91 436,790.43 373,354.15 436,213.54 372,820.85 435,590.44 372,740.14 435,496.15 373,177.71 436,007.39 373,720.44 436,641.49
44 Three Wheel Roller 6-8 T Unit/Jam 123,521 156,000 123,855.34 156,422.08 124,026.09 156,637.72 124,029.54 156,642.08 123,865.73 156,435.20 123,688.80 156,211.75 123,662.02 156,177.93 123,807.19 156,361.27 123,987.25 156,588.67
45 Tire Roller 8-10 T Unit/Jam 220,761 399,000 221,358.49 400,079.56 221,663.65 400,631.10 221,669.82 400,642.25 221,377.05 400,113.11 221,060.83 399,541.58 221,012.98 399,455.09 221,272.43 399,924.02 221,594.24 400,505.65
46 Track Loader 75-100 HP Unit/Jam 206,745 272,000 207,303.98 272,735.94 207,589.77 273,111.93 207,595.55 273,119.53 207,321.36 272,758.81 207,025.22 272,369.20 206,980.41 272,310.24 207,223.39 272,629.91 207,524.76 273,026.40
47 Trailer 20 Ton Unit/Jam 333,770 462,000 334,672.95 463,250.01 335,134.33 463,888.64 335,143.66 463,901.56 334,701.02 463,288.86 334,222.92 462,627.09 334,150.57 462,526.94 334,542.84 463,069.92 335,029.38 463,743.38
48 Trailler 15 Ton Unit/Jam 289,092 440,000 289,874.21 441,190.49 290,273.83 441,798.71 290,281.91 441,811.01 289,898.52 441,227.49 289,484.42 440,597.23 289,421.76 440,501.85 289,761.52 441,018.97 290,182.93 441,660.36
49 Truck Mixer (agitator) Unit/Jam 363,555 534,000 364,538.78 535,444.82 365,041.33 536,182.98 365,051.49 536,197.90 364,569.35 535,489.72 364,048.59 534,724.82 363,969.78 534,609.07 364,397.06 535,236.66 364,927.02 536,015.07
50 Vibrating Rammer Unit/Jam 74,463 74,463 74,664.57 74,664.57 74,767.50 74,767.50 74,769.58 74,769.58 74,670.83 74,670.83 74,564.17 74,564.17 74,548.03 74,548.03 74,635.54 74,635.54 74,744.09 74,744.09
51 Vibratory Roller 5-8 T Unit/Jam 179,587 385,000 180,073.37 386,041.68 180,321.62 386,573.87 180,326.64 386,584.63 180,088.47 386,074.05 179,831.23 385,522.58 179,792.30 385,439.12 180,003.37 385,891.60 180,265.15 386,452.82
52 Water Pump 70-100 MM Unit/Jam 56,066 56,066 56,218.03 56,218.03 56,295.53 56,295.53 56,297.10 56,297.10 56,222.74 56,222.74 56,142.43 56,142.43 56,130.28 56,130.28 56,196.17 56,196.17 56,277.90 56,277.90
53 Water Tanker 3000-4500 L Unit/Jam 203,240 203,240 203,790.35 203,790.35 204,071.30 204,071.30 204,076.98 204,076.98 203,807.44 203,807.44 203,516.32 203,516.32 203,472.26 203,472.26 203,711.13 203,711.13 204,007.39 204,007.39
54 Welding Set Unit/Jam 113,885 113,885 114,192.87 114,192.87 114,350.30 114,350.30 114,353.48 114,353.48 114,202.45 114,202.45 114,039.32 114,039.32 114,014.63 114,014.63 114,148.48 114,148.48 114,314.49 114,314.49
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 197,984 315,000 198,519.91 315,852.28 198,793.59 316,287.71 198,799.12 316,296.52 198,536.56 315,878.77 198,252.97 315,427.56 198,210.05 315,359.28 198,442.74 315,729.49 198,731.34 316,188.67
HARGA SATUAN DASAR BAHAN KABUPATEN TUBAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 276,000 276,000 276,746.76 276,746.76 277,128.28 277,128.28 277,135.99 277,135.99 276,769.97 276,769.97 276,374.63 276,374.63 276,314.80 276,314.80 276,639.17 276,639.17 277,041.50 277,041.50
2 Agregat Pecah Mesin 20-30 mm M3 263,000 263,000 263,711.59 263,711.59 264,075.14 264,075.14 264,082.49 264,082.49 263,733.70 263,733.70 263,356.98 263,356.98 263,299.97 263,299.97 263,609.07 263,609.07 263,992.44 263,992.44
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 301,000 301,000 301,814.40 301,814.40 302,230.48 302,230.48 302,238.89 302,238.89 301,839.71 301,839.71 301,408.56 301,408.56 301,343.31 301,343.31 301,697.07 301,697.07 302,135.84 302,135.84
4 Bahan Agr. Base Kelas A M3 289,000 289,000 289,781.93 289,781.93 290,181.42 290,181.42 290,189.50 290,189.50 289,806.23 289,806.23 289,392.27 289,392.27 289,329.63 289,329.63 289,669.28 289,669.28 290,090.56 290,090.56
5 Bahan Agr. Base Kelas B M3 272,000 272,000 272,735.94 272,735.94 273,111.93 273,111.93 273,119.53 273,119.53 272,758.81 272,758.81 272,369.20 272,369.20 272,310.24 272,310.24 272,629.91 272,629.91 273,026.40 273,026.40
6 Bahan Agr. Base Kelas C M3 250,000 250,000 250,676.41 250,676.41 251,021.99 251,021.99 251,028.98 251,028.98 250,697.43 250,697.43 250,339.34 250,339.34 250,285.14 250,285.14 250,578.96 250,578.96 250,943.39 250,943.39
7 Bahan Agr. Base Kelas C2 M3 228,000 228,000 228,616.89 228,616.89 228,932.06 228,932.06 228,938.43 228,938.43 228,636.06 228,636.06 228,309.47 228,309.47 228,260.05 228,260.05 228,528.01 228,528.01 228,860.37 228,860.37
8 Bahan Agr. Base Kelas S M3 184,000 184,000 184,497.84 184,497.84 184,752.19 184,752.19 184,757.33 184,757.33 184,513.31 184,513.31 184,249.75 184,249.75 184,209.87 184,209.87 184,426.11 184,426.11 184,694.33 184,694.33
9 Bahan Pilihan M3 184,000 184,000 184,497.84 184,497.84 184,752.19 184,752.19 184,757.33 184,757.33 184,513.31 184,513.31 184,249.75 184,249.75 184,209.87 184,209.87 184,426.11 184,426.11 184,694.33 184,694.33
10 Bahan Tanah Timbunan M3 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
11 Batu Belah/Kerakal M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
12 Batu Kali M3 327,000 327,000 327,884.75 327,884.75 328,336.77 328,336.77 328,345.91 328,345.91 327,912.24 327,912.24 327,443.85 327,443.85 327,372.97 327,372.97 327,757.28 327,757.28 328,233.95 328,233.95
13 Chipping M3 195,000 195,000 195,527.60 195,527.60 195,797.15 195,797.15 195,802.60 195,802.60 195,544.00 195,544.00 195,264.68 195,264.68 195,222.41 195,222.41 195,451.59 195,451.59 195,735.84 195,735.84
14 Chipping (kg) Kg 246 246 246.67 246.67 247.01 247.01 247.01 247.01 246.69 246.69 246.33 246.33 246.28 246.28 246.57 246.57 246.93 246.93
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
18 Kapur M3 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
19 Pasir Beton (Kasar) M3 416,000 416,000 417,125.55 417,125.55 417,700.60 417,700.60 417,712.22 417,712.22 417,160.53 417,160.53 416,564.65 416,564.65 416,474.48 416,474.48 416,963.39 416,963.39 417,569.80 417,569.80
20 Pasir Halus (untuk HRS) M3 214,286 214,286 214,865.50 214,865.50 215,161.71 215,161.71 215,167.70 215,167.70 214,883.52 214,883.52 214,576.57 214,576.57 214,530.12 214,530.12 214,781.97 214,781.97 215,094.33 215,094.33
21 Pasir Pasang (Sedang) M3 294,000 294,000 294,795.46 294,795.46 295,201.86 295,201.86 295,210.08 295,210.08 294,820.18 294,820.18 294,399.06 294,399.06 294,335.33 294,335.33 294,680.86 294,680.86 295,109.42 295,109.42
22 Pasir Urug M3 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
23 Pasir Urug (ada unsur lempung) M3 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
24 Sirtu M3 266,667 266,667 267,388.17 267,388.17 267,756.79 267,756.79 267,764.25 267,764.25 267,410.60 267,410.60 267,028.62 267,028.62 266,970.82 266,970.82 267,284.22 267,284.22 267,672.95 267,672.95
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 61,000 61,000 61,165.04 61,165.04 61,249.37 61,249.37 61,251.07 61,251.07 61,170.17 61,170.17 61,082.80 61,082.80 61,069.57 61,069.57 61,141.27 61,141.27 61,230.19 61,230.19
26 Anti Pengelupas Liter 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
27 Arbocell Kg 124,000 124,000 124,335.50 124,335.50 124,506.91 124,506.91 124,510.37 124,510.37 124,345.93 124,345.93 124,168.31 124,168.31 124,141.43 124,141.43 124,287.16 124,287.16 124,467.92 124,467.92
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
34 Aspal Modifikasi (Retona) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
35 Aspal Modifikasi (Starbit) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
36 Aspal Minyak (Curah) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
37 Assetilline Botol 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12 136,314.95 136,314.95 136,513.20 136,513.20
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
40 Beton B-0 M3 516,862 516,862 518,259.95 518,259.95 518,974.42 518,974.42 518,988.86 518,988.86 518,303.41 518,303.41 517,563.06 517,563.06 517,451.02 517,451.02 518,058.47 518,058.47 518,811.90 518,811.90
41 Beton K-125 (fc' 10 MPa) M3 534,382 534,382 535,828.08 535,828.08 536,566.77 536,566.77 536,581.71 536,581.71 535,873.02 535,873.02 535,107.57 535,107.57 534,991.73 534,991.73 535,619.77 535,619.77 536,398.75 536,398.75
42 Beton K-175 (fc' 15 MPa) M3 578,184 578,184 579,748.42 579,748.42 580,547.65 580,547.65 580,563.81 580,563.81 579,797.03 579,797.03 578,968.84 578,968.84 578,843.51 578,843.51 579,523.03 579,523.03 580,365.86 580,365.86
43 Beton K-250 (fc' 20 MPa) M3 643,887 643,887 645,628.92 645,628.92 646,518.98 646,518.98 646,536.97 646,536.97 645,683.06 645,683.06 644,760.76 644,760.76 644,621.18 644,621.18 645,377.92 645,377.92 646,316.52 646,316.52
44 Beton K-300 (fc' 25 MPa) M3 670,168 670,168 671,981.12 671,981.12 672,907.51 672,907.51 672,926.24 672,926.24 672,037.47 672,037.47 671,077.52 671,077.52 670,932.25 670,932.25 671,719.88 671,719.88 672,696.79 672,696.79
45 Beton K-350 (fc' 30 MPa) M3 696,449 696,449 698,333.32 698,333.32 699,296.03 699,296.03 699,315.50 699,315.50 698,391.88 698,391.88 697,394.29 697,394.29 697,243.32 697,243.32 698,061.84 698,061.84 699,077.05 699,077.05
46 Beton K-400 (fc' 35 MPa) M3 722,730 722,730 724,685.52 724,685.52 725,684.56 725,684.56 725,704.77 725,704.77 724,746.29 724,746.29 723,711.06 723,711.06 723,554.39 723,554.39 724,403.79 724,403.79 725,457.32 725,457.32
47 Beton K-450 (fc' 40 MPa) M3 757,772 757,772 759,821.79 759,821.79 760,869.27 760,869.27 760,890.45 760,890.45 759,885.51 759,885.51 758,800.08 758,800.08 758,635.82 758,635.82 759,526.40 759,526.40 760,631.01 760,631.01
48 Beton K-500 (fc' 45 MPa) M3 788,433 788,433 790,566.02 790,566.02 791,655.89 791,655.89 791,677.93 791,677.93 790,632.32 790,632.32 789,502.97 789,502.97 789,332.06 789,332.06 790,258.68 790,258.68 791,407.99 791,407.99
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 57,000 57,000 57,154.22 57,154.22 57,233.01 57,233.01 57,234.61 57,234.61 57,159.02 57,159.02 57,077.37 57,077.37 57,065.01 57,065.01 57,132.00 57,132.00 57,215.09 57,215.09
51 Cat Anti Karat Kg 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
52 Cat Marka (Non Thermoplas) Kg 56,942 56,942 57,096.44 57,096.44 57,175.15 57,175.15 57,176.74 57,176.74 57,101.22 57,101.22 57,019.66 57,019.66 57,007.32 57,007.32 57,074.24 57,074.24 57,157.24 57,157.24
53 Cat Marka (Thermoplastic) Kg 38,896 38,896 39,001.26 39,001.26 39,055.02 39,055.02 39,056.11 39,056.11 39,004.53 39,004.53 38,948.81 38,948.81 38,940.38 38,940.38 38,986.09 38,986.09 39,042.79 39,042.79
54 Cerucuk Diameter 10-15 cm M' 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,143,000 1,143,000 1,146,092.56 1,146,092.56 1,147,672.55 1,147,672.55 1,147,704.50 1,147,704.50 1,146,188.67 1,146,188.67 1,144,551.44 1,144,551.44 1,144,303.67 1,144,303.67 1,145,647.00 1,145,647.00 1,147,313.16 1,147,313.16
57 Curing Compound Liter 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 534,000 534,000 535,444.82 535,444.82 536,182.98 536,182.98 536,197.90 536,197.90 535,489.72 535,489.72 534,724.82 534,724.82 534,609.07 534,609.07 535,236.66 535,236.66 536,015.07 536,015.07
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 622,000 622,000 623,682.92 623,682.92 624,542.72 624,542.72 624,560.10 624,560.10 623,735.22 623,735.22 622,844.27 622,844.27 622,709.44 622,709.44 623,440.45 623,440.45 624,347.15 624,347.15
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 788,000 788,000 790,132.05 790,132.05 791,221.32 791,221.32 791,243.35 791,243.35 790,198.31 790,198.31 789,069.58 789,069.58 788,898.77 788,898.77 789,824.88 789,824.88 790,973.56 790,973.56
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
64 Oxygen (Isi 6 M3) Botol 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
65 Polytene 125 Mikron Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
66 Sand Sheet Ton 1,209,000 1,209,000 1,212,271.13 1,212,271.13 1,213,942.36 1,213,942.36 1,213,976.15 1,213,976.15 1,212,372.79 1,212,372.79 1,210,641.02 1,210,641.02 1,210,378.95 1,210,378.95 1,211,799.85 1,211,799.85 1,213,562.22 1,213,562.22
67 Seal Coat M2 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
68 Seal Guard Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
69 Semen/PC (50 kg) Zak 75,000 75,000 75,202.92 75,202.92 75,306.60 75,306.60 75,308.69 75,308.69 75,209.23 75,209.23 75,101.80 75,101.80 75,085.54 75,085.54 75,173.69 75,173.69 75,283.02 75,283.02
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
77 Baja Tulangan (Polos) U25 Kg 8,918 8,918 8,941.70 8,941.70 8,954.03 8,954.03 8,954.28 8,954.28 8,942.45 8,942.45 8,929.68 8,929.68 8,927.75 8,927.75 8,938.23 8,938.23 8,951.23 8,951.23
78 Baja Tulangan (Polos) U32 Kg 8,918 8,918 8,941.70 8,941.70 8,954.03 8,954.03 8,954.28 8,954.28 8,942.45 8,942.45 8,929.68 8,929.68 8,927.75 8,927.75 8,938.23 8,938.23 8,951.23 8,951.23
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
84 Baja Tulangan (Ulir) D36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,388,000 11,388,000 11,418,811.98 11,418,811.98 11,434,553.82 11,434,553.82 11,434,872.13 11,434,872.13 11,419,769.54 11,419,769.54 11,403,457.40 11,403,457.40 11,400,988.84 11,400,988.84 11,414,372.78 11,414,372.78 11,430,973.16 11,430,973.16
87 Box Culvert Type DUB 200×200 M' 12,089,000 12,089,000 12,121,708.64 12,121,708.64 12,138,419.49 12,138,419.49 12,138,757.39 12,138,757.39 12,122,725.15 12,122,725.15 12,105,408.89 12,105,408.89 12,102,788.38 12,102,788.38 12,116,996.18 12,116,996.18 12,134,618.41 12,134,618.41
88 Box Culvert Type uk 300×200 M' 13,053,000 13,053,000 13,088,316.89 13,088,316.89 13,106,360.30 13,106,360.30 13,106,725.14 13,106,725.14 13,089,414.46 13,089,414.46 13,070,717.37 13,070,717.37 13,067,887.89 13,067,887.89 13,083,228.65 13,083,228.65 13,102,256.11 13,102,256.11
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
91 Ducting (Strand Prestress) M' 148,000 148,000 148,400.44 148,400.44 148,605.02 148,605.02 148,609.16 148,609.16 148,412.88 148,412.88 148,200.89 148,200.89 148,168.80 148,168.80 148,342.74 148,342.74 148,558.48 148,558.48
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 1,906,000 1,906,000 1,911,156.98 1,911,156.98 1,913,791.67 1,913,791.67 1,913,844.95 1,913,844.95 1,911,317.24 1,911,317.24 1,908,587.09 1,908,587.09 1,908,173.93 1,908,173.93 1,910,413.99 1,910,413.99 1,913,192.38 1,913,192.38
94 Expansion Join Tipe Rubber M' 1,380,000 1,380,000 1,383,733.80 1,383,733.80 1,385,641.40 1,385,641.40 1,385,679.97 1,385,679.97 1,383,849.84 1,383,849.84 1,381,873.13 1,381,873.13 1,381,573.99 1,381,573.99 1,383,195.86 1,383,195.86 1,385,207.50 1,385,207.50
95 Expansion Join Tipe Torma M' 1,583,000 1,583,000 1,587,283.05 1,587,283.05 1,589,471.26 1,589,471.26 1,589,515.51 1,589,515.51 1,587,416.16 1,587,416.16 1,585,148.67 1,585,148.67 1,584,805.53 1,584,805.53 1,586,665.97 1,586,665.97 1,588,973.53 1,588,973.53
96 Expansion Tipe Joint Asphaltic Plug M' 1,878,000 1,878,000 1,883,081.22 1,883,081.22 1,885,677.21 1,885,677.21 1,885,729.70 1,885,729.70 1,883,239.13 1,883,239.13 1,880,549.09 1,880,549.09 1,880,142.00 1,880,142.00 1,882,349.15 1,882,349.15 1,885,086.72 1,885,086.72
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
99 Glass Bead Kg 61,000 61,000 61,165.04 61,165.04 61,249.37 61,249.37 61,251.07 61,251.07 61,170.17 61,170.17 61,082.80 61,082.80 61,069.57 61,069.57 61,141.27 61,141.27 61,230.19 61,230.19
100 Joint Sealent Kg 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
101 Joint Socket Pile 16×16×16 Set 80,000 80,000 80,216.45 80,216.45 80,327.04 80,327.04 80,329.27 80,329.27 80,223.18 80,223.18 80,108.59 80,108.59 80,091.25 80,091.25 80,185.27 80,185.27 80,301.88 80,301.88
102 Joint Socket Pile 35×35 Set 685,000 685,000 686,853.37 686,853.37 687,800.26 687,800.26 687,819.41 687,819.41 686,910.97 686,910.97 685,929.78 685,929.78 685,781.29 685,781.29 686,586.35 686,586.35 687,584.88 687,584.88
103 Kawat Beton Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
104 Kawat Bronjong Kg 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
105 Kawat Las Dos 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
106 Kayu Acuan (Kelas III/Meranti) M3 3,767,000 3,767,000 3,777,192.20 3,777,192.20 3,782,399.39 3,782,399.39 3,782,504.68 3,782,504.68 3,777,508.95 3,777,508.95 3,772,113.10 3,772,113.10 3,771,296.54 3,771,296.54 3,775,723.77 3,775,723.77 3,781,214.95 3,781,214.95
107 Kayu Perancah (Gelam) M3 2,427,000 2,427,000 2,433,566.62 2,433,566.62 2,436,921.51 2,436,921.51 2,436,989.35 2,436,989.35 2,433,770.70 2,433,770.70 2,430,294.27 2,430,294.27 2,429,768.17 2,429,768.17 2,432,620.54 2,432,620.54 2,436,158.40 2,436,158.40
108 Kerb Pracetak Type 1 (Peninggi) Buah 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 83,000 83,000 83,224.57 83,224.57 83,339.30 83,339.30 83,341.62 83,341.62 83,231.55 83,231.55 83,112.66 83,112.66 83,094.67 83,094.67 83,192.21 83,192.21 83,313.20 83,313.20
110 Marmer Nama Jembatan Buah 526,000 526,000 527,423.17 527,423.17 528,150.27 528,150.27 528,164.98 528,164.98 527,467.40 527,467.40 526,713.96 526,713.96 526,599.94 526,599.94 527,218.13 527,218.13 527,984.89 527,984.89
111 Mata Kucing Buah 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
112 Matras Concrete (Tebal=10 cm) M2 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
113 Mini Pile 16×16×16 M' 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
114 Mini Timber Pile Buah 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
115 Multipleks 12 mm Lbr 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
116 Paku Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
117 Paving Block (Model Bata 8 cm) M2 83,000 83,000 83,224.57 83,224.57 83,339.30 83,339.30 83,341.62 83,341.62 83,231.55 83,231.55 83,112.66 83,112.66 83,094.67 83,094.67 83,192.21 83,192.21 83,313.20 83,313.20
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 58,237,000 58,237,000 58,394,569.13 58,394,569.13 58,475,071.21 58,475,071.21 58,476,699.01 58,476,699.01 58,399,466.01 58,399,466.01 58,316,047.45 58,316,047.45 58,303,423.52 58,303,423.52 58,371,867.54 58,371,867.54 58,456,760.07 58,456,760.07
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 82,503,000 82,503,000 82,726,224.51 82,726,224.51 82,840,269.93 82,840,269.93 82,842,576.00 82,842,576.00 82,733,161.81 82,733,161.81 82,614,984.68 82,614,984.68 82,597,100.65 82,597,100.65 82,694,063.70 82,694,063.70 82,814,328.96 82,814,328.96
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 157,687,000 157,687,000 158,113,646.35 158,113,646.35 158,331,620.00 158,331,620.00 158,336,027.56 158,336,027.56 158,126,905.53 158,126,905.53 157,901,034.99 157,901,034.99 157,866,853.44 157,866,853.44 158,052,177.77 158,052,177.77 158,282,039.34 158,282,039.34
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 206,781,000 206,781,000 207,340,477.69 207,340,477.69 207,626,314.89 207,626,314.89 207,632,094.69 207,632,094.69 207,357,864.96 207,357,864.96 207,061,672.27 207,061,672.27 207,016,848.71 207,016,848.71 207,259,871.59 207,259,871.59 207,561,297.86 207,561,297.86
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 263,591,000 263,591,000 264,304,185.86 264,304,185.86 264,668,552.56 264,668,552.56 264,675,920.28 264,675,920.28 264,326,350.02 264,326,350.02 263,948,782.80 263,948,782.80 263,891,644.63 263,891,644.63 264,201,434.43 264,201,434.43 264,585,673.08 264,585,673.08
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 318,022,000 318,022,000 318,882,457.27 318,882,457.27 319,322,064.95 319,322,064.95 319,330,954.08 319,330,954.08 318,909,198.29 318,909,198.29 318,453,664.21 318,453,664.21 318,384,727.13 318,384,727.13 318,758,487.89 318,758,487.89 319,222,071.02 319,222,071.02
124 Pelat Rambu (Eng. Grade) Buah 184,000 184,000 184,497.84 184,497.84 184,752.19 184,752.19 184,757.33 184,757.33 184,513.31 184,513.31 184,249.75 184,249.75 184,209.87 184,209.87 184,426.11 184,426.11 184,694.33 184,694.33
125 Pelat Rambu (High L Grade) Buah 215,000 215,000 215,581.72 215,581.72 215,878.91 215,878.91 215,884.92 215,884.92 215,599.79 215,599.79 215,291.83 215,291.83 215,245.22 215,245.22 215,497.91 215,497.91 215,811.31 215,811.31
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
128 Pipa Drainase Baja Dia 3" M' 241,000 241,000 241,652.06 241,652.06 241,985.20 241,985.20 241,991.94 241,991.94 241,672.33 241,672.33 241,327.12 241,327.12 241,274.88 241,274.88 241,558.12 241,558.12 241,909.42 241,909.42
129 Pipa Galvanis Dia 1,5" M' 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
130 Pipa Galvanis Dia 2" M' 276,000 276,000 276,746.76 276,746.76 277,128.28 277,128.28 277,135.99 277,135.99 276,769.97 276,769.97 276,374.63 276,374.63 276,314.80 276,314.80 276,639.17 276,639.17 277,041.50 277,041.50
131 Pipa Galvanis Dia 3" M' 211,000 211,000 211,570.89 211,570.89 211,862.56 211,862.56 211,868.46 211,868.46 211,588.63 211,588.63 211,286.40 211,286.40 211,240.66 211,240.66 211,488.64 211,488.64 211,796.22 211,796.22
132 Pipa Porus M' 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
133 Pipa PVC Dia 4" M' 230,000 230,000 230,622.30 230,622.30 230,940.23 230,940.23 230,946.66 230,946.66 230,641.64 230,641.64 230,312.19 230,312.19 230,262.33 230,262.33 230,532.64 230,532.64 230,867.92 230,867.92
134 Plastik Filter M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
135 Rel Pengaman M' 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,799,000 1,799,000 1,803,867.47 1,803,867.47 1,806,354.26 1,806,354.26 1,806,404.55 1,806,404.55 1,804,018.74 1,804,018.74 1,801,441.86 1,801,441.86 1,801,051.89 1,801,051.89 1,803,166.20 1,803,166.20 1,805,788.61 1,805,788.61
137 Strip Bearing Buah 276,000 276,000 276,746.76 276,746.76 277,128.28 277,128.28 277,135.99 277,135.99 276,769.97 276,769.97 276,374.63 276,374.63 276,314.80 276,314.80 276,639.17 276,639.17 277,041.50 277,041.50
138 Tiang Pancang Baja Diameter 400 M' 638,000 638,000 639,726.21 639,726.21 640,608.13 640,608.13 640,625.96 640,625.96 639,779.85 639,779.85 638,865.98 638,865.98 638,727.69 638,727.69 639,477.51 639,477.51 640,407.52 640,407.52
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 779,000 779,000 781,107.70 781,107.70 782,184.53 782,184.53 782,206.30 782,206.30 781,173.21 781,173.21 780,057.37 780,057.37 779,888.51 779,888.51 780,804.04 780,804.04 781,939.59 781,939.59
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,629,000 1,629,000 1,633,407.51 1,633,407.51 1,635,659.31 1,635,659.31 1,635,704.84 1,635,704.84 1,633,544.48 1,633,544.48 1,631,211.11 1,631,211.11 1,630,857.99 1,630,857.99 1,632,772.50 1,632,772.50 1,635,147.11 1,635,147.11
HARGA SATUAN DASAR UPAH KABUPATEN TUBAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 105,271.76
2 Tukang OH 118,491.49 118,491.49 118,371.73 118,371.73 118,199.54 118,199.54 118,134.57 118,134.57 118,234.64 118,234.64 118,404.36 118,404.36 118,486.03 118,486.03 118,305.40 118,305.40
3 Mandor OH 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17 136,351.99 136,351.99
4 Operator OH 281,166.24 281,166.24 280,882.08 280,882.08 280,473.49 280,473.49 280,319.33 280,319.33 280,556.76 280,556.76 280,959.50 280,959.50 281,153.30 281,153.30 280,724.69 280,724.69
5 Pembantu Operator OH 175,728.90 175,728.90 175,551.30 175,551.30 175,295.93 175,295.93 175,199.58 175,199.58 175,347.98 175,347.98 175,599.69 175,599.69 175,720.81 175,720.81 175,452.93 175,452.93
6 Sopir OH 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 131,339.05
7 Pembantu Sopir OH 114,474.83 114,474.83 114,359.13 114,359.13 114,192.78 114,192.78 114,130.01 114,130.01 114,226.68 114,226.68 114,390.66 114,390.66 114,469.56 114,469.56 114,295.05 114,295.05
8 Mekanik OH 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 158,408.93
9 Pembantu Mekanik OH 114,474.83 114,474.83 114,359.13 114,359.13 114,192.78 114,192.78 114,130.01 114,130.01 114,226.68 114,226.68 114,390.66 114,390.66 114,469.56 114,469.56 114,295.05 114,295.05
10 Kepala Tukang OH 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 131,339.05
11 Pemasak Aspal OH 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 131,339.05

HARGA SATUAN DASAR ALAT KABUPATEN TUBAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 414,331.76 462,920.13 413,913.01 462,452.28 413,310.90 461,779.56 413,083.73 461,525.75 413,433.62 461,916.67 414,027.11 462,579.76 414,312.69 462,898.83 413,681.08 841,393.88
2 Asphalt Distribution Unit/Jam 255,108.73 328,362.00 254,850.90 328,030.14 254,480.17 327,552.97 254,340.30 327,372.93 254,555.73 327,650.22 254,921.15 328,120.56 255,096.98 328,346.89 254,708.10 561,324.49
3 Asphalt Finisher Unit/Jam 187,372.96 888,686.16 187,183.59 887,788.00 186,911.30 886,496.56 186,808.57 886,009.30 186,966.80 886,759.76 187,235.19 888,032.72 187,364.34 888,645.25 187,078.70 1,058,776.21
4 Asphalt Liquid Mixer Unit/Jam 66,856.08 122,508.15 66,788.51 122,384.33 66,691.36 122,206.31 66,654.70 122,139.14 66,711.16 122,242.59 66,806.92 122,418.07 66,853.00 122,502.51 66,751.09 183,503.14
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 89,727.90 89,727.90 89,637.21 89,637.21 89,506.82 89,506.82 89,457.62 89,457.62 89,533.40 89,533.40 89,661.92 89,661.92 89,723.77 89,723.77 89,586.99 171,706.89
6 Asphalt Mixing Plant Unit/Jam 1,002,841.20 5,144,046.68 1,001,827.67 5,138,847.81 1,000,370.34 5,131,372.45 999,820.50 5,128,552.05 1,000,667.36 5,132,895.99 1,002,103.83 5,140,264.34 1,002,795.04 5,143,809.89 1,001,266.31 6,053,778.97
7 Asphalt Sprayer Unit/Jam 82,690.41 82,690.41 82,606.84 82,606.84 82,486.68 82,486.68 82,441.34 82,441.34 82,511.17 82,511.17 82,629.61 82,629.61 82,686.61 82,686.61 82,560.56 158,239.68
8 Asphalt Tanker Unit/Jam 387,061.52 448,861.82 386,670.33 448,408.18 386,107.85 447,755.89 385,895.63 447,509.78 386,222.49 447,888.83 386,776.92 448,531.78 387,043.70 448,841.16 386,453.66 802,399.63
9 Blending Equipment Unit/Jam 125,794.99 198,824.70 125,667.86 198,623.76 125,485.05 198,334.82 125,416.08 198,225.81 125,522.31 198,393.71 125,702.50 198,678.51 125,789.20 198,815.55 125,597.44 313,641.34
10 Bore Pile Machine Unit/Jam 346,595.99 602,499.09 346,245.70 601,890.17 345,742.03 601,014.61 345,552.00 600,684.27 345,844.68 601,193.06 346,341.15 602,056.08 346,580.04 602,471.36 346,051.69 918,761.16
11 Bore Pile Machine Dia 60 Unit/Jam 226,958.80 685,844.80 226,729.42 685,151.64 226,399.60 684,154.97 226,275.16 683,778.93 226,466.82 684,358.10 226,791.92 685,340.51 226,948.35 685,813.23 226,602.37 892,482.77
12 Bore Pile Machine Dia 80 Unit/Jam 897,278.97 897,278.97 896,372.13 896,372.13 895,068.20 895,068.20 894,576.23 894,576.23 895,333.95 895,333.95 896,619.21 896,619.21 897,237.67 897,237.67 895,869.85 1,717,068.88
13 Bulldozer 100-150 HP Unit/Jam 351,874.11 510,115.90 351,518.48 509,600.34 351,007.14 508,859.04 350,814.21 508,579.35 351,111.35 509,010.12 351,615.38 509,740.82 351,857.91 510,092.41 351,321.51 831,353.63
14 Cement Tanker Unit/Jam 327,242.92 421,749.36 326,912.19 421,323.12 326,436.64 420,710.23 326,257.21 420,478.99 326,533.56 420,835.14 327,002.30 421,439.26 327,227.86 421,729.95 326,729.01 720,583.15
15 Cold Milling Unit/Jam 511,097.14 1,087,510.86 510,580.59 1,086,411.76 509,837.87 1,084,831.38 509,557.64 1,084,235.11 509,989.24 1,085,153.47 510,721.34 1,086,711.23 511,073.61 1,087,460.80 510,294.50 1,553,564.40
16 Cold Recycler Unit/Jam 4,304,300.01 4,304,300.01 4,299,949.83 4,299,949.83 4,293,694.80 4,293,694.80 4,291,334.81 4,291,334.81 4,294,969.63 4,294,969.63 4,301,135.12 4,301,135.12 4,304,101.87 4,304,101.87 4,297,540.39 8,236,880.41
17 Compressor 4000-6500 L\M Unit/Jam 131,073.10 131,073.10 130,940.63 130,940.63 130,750.16 130,750.16 130,678.29 130,678.29 130,788.98 130,788.98 130,976.73 130,976.73 131,067.07 131,067.07 130,867.26 250,826.73
18 Concrete Breaker Unit/Jam 477,669.10 910,777.79 477,186.34 909,857.31 476,492.19 908,533.76 476,230.29 908,034.39 476,633.66 908,803.51 477,317.88 910,108.11 477,647.11 910,735.87 476,918.95 1,346,515.19
19 Concrete Mixer (350) Unit/Jam 88,848.21 88,848.21 88,758.42 88,758.42 88,629.30 88,629.30 88,580.59 88,580.59 88,655.62 88,655.62 88,782.88 88,782.88 88,844.12 88,844.12 88,708.68 170,023.49
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 101,163.81 101,163.81 101,061.56 101,061.56 100,914.55 100,914.55 100,859.09 100,859.09 100,944.51 100,944.51 101,089.42 101,089.42 101,159.15 101,159.15 101,004.93 193,591.10
21 Concrete Pan Mixer Unit/Jam 269,183.69 576,390.80 268,911.64 575,808.26 268,520.46 574,970.65 268,372.87 574,654.62 268,600.19 575,141.36 268,985.76 575,966.98 269,171.30 576,364.26 268,760.96 821,845.32
22 Concrete Pump Unit/Jam 204,966.67 219,912.17 204,759.52 219,689.91 204,461.66 219,370.33 204,349.28 219,249.76 204,522.36 219,435.47 204,815.96 219,750.47 204,957.23 219,902.04 204,644.78 407,154.43
23 Concrete Vibrator Unit/Jam 76,532.62 76,532.62 76,455.27 76,455.27 76,344.05 76,344.05 76,302.09 76,302.09 76,366.72 76,366.72 76,476.34 76,476.34 76,529.10 76,529.10 76,412.43 146,455.87
24 Crane 10-15 Ton Unit/Jam 274,461.80 274,461.80 274,184.42 274,184.42 273,785.57 273,785.57 273,635.08 273,635.08 273,866.86 273,866.86 274,260.00 274,260.00 274,449.17 274,449.17 274,030.78 525,221.07
25 Crane On Track 35 Ton Unit/Jam 227,838.48 432,795.18 227,608.22 432,357.77 227,277.12 431,728.83 227,152.20 431,491.54 227,344.60 431,857.02 227,670.96 432,476.95 227,828.00 432,775.26 227,480.68 640,635.65
26 Crane On Track 75-100 Ton Unit/Jam 358,031.90 543,253.35 357,670.06 542,704.30 357,149.76 541,914.84 356,953.46 541,616.99 357,255.80 542,075.74 357,768.65 542,853.90 358,015.42 543,228.34 357,469.64 870,074.72
27 Dump Truck 10 Ton Unit/Jam 338,678.83 364,511.95 338,336.54 364,143.55 337,844.37 363,613.84 337,658.68 363,413.99 337,944.68 363,721.80 338,429.80 364,243.93 338,663.24 364,495.17 338,146.95 673,901.88
28 Dump Truck 3-4 M3 Unit/Jam 184,733.91 242,003.80 184,547.20 241,759.22 184,278.75 241,407.54 184,177.46 241,274.85 184,333.46 241,479.21 184,598.07 241,825.86 184,725.40 241,992.66 184,443.79 410,694.14
29 Excavator 80-140 HP Unit/Jam 267,424.32 424,761.86 267,154.05 424,332.57 266,765.42 423,715.30 266,618.80 423,482.41 266,844.63 423,841.11 267,227.69 424,449.54 267,412.01 424,742.31 267,004.35 668,844.31
30 Flat Bed Truck 3-4 M3 Unit/Jam 324,603.86 433,799.35 324,275.80 433,360.92 323,804.08 432,730.52 323,626.11 432,492.68 323,900.22 432,859.00 324,365.19 433,480.38 324,588.92 433,779.38 324,094.09 730,198.92
31 Fulvi Mixer Unit/Jam 812,829.19 1,269,264.75 812,007.69 1,267,981.96 810,826.49 1,266,137.46 810,380.82 1,265,441.54 811,067.23 1,266,513.38 812,231.52 1,268,331.48 812,791.77 1,269,206.32 811,552.69 2,011,181.16
32 Generator Set Unit/Jam 361,550.64 383,591.09 361,185.24 383,203.41 360,659.83 382,645.97 360,461.60 382,435.65 360,766.92 382,759.58 361,284.80 383,309.04 361,534.00 383,573.43 360,982.85 713,883.58
33 Hot Recycler Unit/Jam 2,655,769.82 7,788,304.91 2,653,085.74 7,780,433.60 2,649,226.36 7,769,115.59 2,647,770.24 7,764,845.38 2,650,012.94 7,771,422.30 2,653,817.07 7,782,578.28 2,655,647.57 7,787,946.40 2,651,599.11 10,206,661.99
34 Jack Hammer Unit/Jam 50,142.06 50,142.06 50,091.38 50,091.38 50,018.52 50,018.52 49,991.02 49,991.02 50,033.37 50,033.37 50,105.19 50,105.19 50,139.75 50,139.75 50,063.32 95,953.85
35 Launching Gantry Unit/Jam 63,811,489.49 63,811,489.49 63,746,997.90 63,746,997.90 63,654,266.67 63,654,266.67 63,619,279.80 63,619,279.80 63,673,166.12 63,673,166.12 63,764,569.82 63,764,569.82 63,808,552.09 63,808,552.09 63,711,277.80 122,112,215.07
36 Motor Grader > 100 HP Unit/Jam 250,710.30 421,749.36 250,456.92 421,323.12 250,092.58 420,710.23 249,955.12 420,478.99 250,166.84 420,835.14 250,525.96 421,439.26 250,698.76 421,729.95 250,316.58 650,539.70
37 Pedestrian Roller Unit/Jam 82,690.41 82,690.41 82,606.84 82,606.84 82,486.68 82,486.68 82,441.34 82,441.34 82,511.17 82,511.17 82,629.61 82,629.61 82,686.61 82,686.61 82,560.56 158,239.68
38 Pile Driver + Hammer Unit/Jam 94,126.32 275,141.25 94,031.19 274,863.18 93,894.41 274,463.34 93,842.80 274,312.49 93,922.29 274,544.83 94,057.11 274,938.94 94,121.99 275,128.59 93,978.50 360,854.55
39 Rock Drill Breaker Unit/Jam 91,487.27 297,232.88 91,394.81 296,932.48 91,261.86 296,500.54 91,211.69 296,337.58 91,288.95 296,588.58 91,420.00 297,014.33 91,483.06 297,219.20 91,343.59 380,496.20
40 Split Form Paver Unit/Jam 193,530.76 193,530.76 193,335.17 193,335.17 193,053.93 193,053.93 192,947.82 192,947.82 193,111.24 193,111.24 193,388.46 193,388.46 193,521.85 193,521.85 193,226.83 370,348.19
41 Stone Crusher Unit/Jam 518,134.62 645,678.19 517,610.96 645,025.63 516,858.01 644,087.33 516,573.92 643,733.31 517,011.47 644,278.56 517,753.64 645,203.43 518,110.77 645,648.47 517,320.93 1,118,866.38
42 Tamper Unit/Jam 77,412.30 77,412.30 77,334.07 77,334.07 77,221.57 77,221.57 77,179.13 77,179.13 77,244.50 77,244.50 77,355.38 77,355.38 77,408.74 77,408.74 77,290.73 148,139.28
43 Tandem Roller 6-8 T Unit/Jam 373,866.24 436,811.84 373,488.39 436,370.37 372,945.08 435,735.60 372,740.10 435,496.10 373,055.81 435,864.97 373,591.34 436,490.66 373,849.03 436,791.73 373,279.11 778,292.12
44 Three Wheel Roller 6-8 T Unit/Jam 124,035.62 156,649.76 123,910.26 156,491.44 123,730.02 156,263.80 123,662.01 156,177.91 123,766.75 156,310.20 123,944.42 156,534.58 124,029.91 156,642.55 123,840.83 269,922.44
45 Tire Roller 8-10 T Unit/Jam 221,680.69 400,661.90 221,456.64 400,256.96 221,134.50 399,674.72 221,012.95 399,455.04 221,200.15 399,793.39 221,517.69 400,367.29 221,670.48 400,643.45 221,332.55 602,917.15
46 Track Loader 75-100 HP Unit/Jam 207,605.72 273,132.92 207,395.90 272,856.88 207,094.21 272,459.96 206,980.38 272,310.20 207,155.70 272,540.85 207,453.07 272,932.09 207,596.17 273,120.35 207,279.69 462,706.90
47 Trailer 20 Ton Unit/Jam 335,160.09 463,924.30 334,821.35 463,455.43 334,334.30 462,781.25 334,150.53 462,526.89 334,433.56 462,918.66 334,913.65 463,583.18 335,144.66 463,902.94 334,633.74 769,937.73
48 Trailler 15 Ton Unit/Jam 290,296.14 441,832.67 290,002.75 441,386.12 289,580.89 440,744.05 289,421.72 440,501.80 289,666.87 440,874.91 290,082.69 441,507.79 290,282.77 441,812.33 289,840.25 706,820.83
49 Truck Mixer (agitator) Unit/Jam 365,069.39 536,224.19 364,700.42 535,682.25 364,169.90 534,903.01 363,969.74 534,609.00 364,278.03 535,061.82 364,800.96 535,829.91 365,052.58 536,199.51 364,496.07 869,497.38
50 Vibrating Rammer Unit/Jam 74,773.25 74,773.25 74,697.68 74,697.68 74,589.02 74,589.02 74,548.02 74,548.02 74,611.16 74,611.16 74,718.27 74,718.27 74,769.81 74,769.81 74,655.82 143,089.07
51 Vibratory Roller 5-8 T Unit/Jam 180,335.48 386,603.58 180,153.22 386,212.86 179,891.16 385,651.04 179,792.28 385,439.08 179,944.57 385,765.55 180,202.88 386,319.32 180,327.18 386,585.79 180,052.27 551,041.35
52 Water Pump 70-100 MM Unit/Jam 56,299.86 56,299.86 56,242.96 56,242.96 56,161.14 56,161.14 56,130.27 56,130.27 56,177.82 56,177.82 56,258.46 56,258.46 56,297.27 56,297.27 56,211.44 107,737.66
53 Water Tanker 3000-4500 L Unit/Jam 204,086.98 204,086.98 203,880.72 203,880.72 203,584.14 203,584.14 203,472.24 203,472.24 203,644.58 203,644.58 203,936.92 203,936.92 204,077.59 204,077.59 203,766.48 390,549.00
54 Welding Set Unit/Jam 114,359.08 114,359.08 114,243.51 114,243.51 114,077.32 114,077.32 114,014.62 114,014.62 114,111.19 114,111.19 114,275.00 114,275.00 114,353.82 114,353.82 114,179.49 218,842.11
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 198,808.87 316,312.02 198,607.94 315,992.34 198,319.03 315,532.67 198,210.03 315,359.24 198,377.91 315,626.36 198,662.69 316,079.44 198,799.72 316,297.46 198,496.65 497,767.22
HARGA SATUAN DASAR BAHAN KABUPATEN TUBAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 277,149.58 277,149.58 276,869.48 276,869.48 276,466.72 276,466.72 276,314.77 276,314.77 276,548.81 276,548.81 276,945.80 276,945.80 277,136.82 277,136.82 276,714.34 530,364.51
2 Agregat Pecah Mesin 20-30 mm M3 264,095.43 264,095.43 263,828.52 263,828.52 263,444.74 263,444.74 263,299.94 263,299.94 263,522.96 263,522.96 263,901.25 263,901.25 264,083.28 264,083.28 263,680.69 505,383.57
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 302,253.71 302,253.71 301,948.24 301,948.24 301,509.00 301,509.00 301,343.28 301,343.28 301,598.52 301,598.52 302,031.47 302,031.47 302,239.80 302,239.80 301,779.04 578,404.77
4 Bahan Agr. Base Kelas A M3 290,203.73 290,203.73 289,910.43 289,910.43 289,488.71 289,488.71 289,329.59 289,329.59 289,574.66 289,574.66 289,990.35 289,990.35 290,190.37 290,190.37 289,747.98 555,345.45
5 Bahan Agr. Base Kelas B M3 273,132.92 273,132.92 272,856.88 272,856.88 272,459.96 272,459.96 272,310.20 272,310.20 272,540.85 272,540.85 272,932.09 272,932.09 273,120.35 273,120.35 272,703.98 522,678.07
6 Bahan Agr. Base Kelas C M3 251,041.29 251,041.29 250,787.57 250,787.57 250,422.76 250,422.76 250,285.11 250,285.11 250,497.11 250,497.11 250,856.70 250,856.70 251,029.73 251,029.73 250,647.04 480,402.64
7 Bahan Agr. Base Kelas C2 M3 228,949.65 228,949.65 228,718.26 228,718.26 228,385.55 228,385.55 228,260.02 228,260.02 228,453.36 228,453.36 228,781.31 228,781.31 228,939.12 228,939.12 228,590.10 438,127.20
8 Bahan Agr. Base Kelas S M3 184,766.39 184,766.39 184,579.65 184,579.65 184,311.15 184,311.15 184,209.84 184,209.84 184,365.87 184,365.87 184,630.53 184,630.53 184,757.88 184,757.88 184,476.22 353,576.34
9 Bahan Pilihan M3 184,766.39 184,766.39 184,579.65 184,579.65 184,311.15 184,311.15 184,209.84 184,209.84 184,365.87 184,365.87 184,630.53 184,630.53 184,757.88 184,757.88 184,476.22 353,576.34
10 Bahan Tanah Timbunan M3 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
11 Batu Belah/Kerakal M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
12 Batu Kali M3 328,362.00 328,362.00 328,030.14 328,030.14 327,552.97 327,552.97 327,372.93 327,372.93 327,650.22 327,650.22 328,120.56 328,120.56 328,346.89 328,346.89 327,846.33 628,366.65
13 Chipping M3 195,812.20 195,812.20 195,614.31 195,614.31 195,329.75 195,329.75 195,222.39 195,222.39 195,387.74 195,387.74 195,668.23 195,668.23 195,803.19 195,803.19 195,504.69 374,714.06
14 Chipping (kg) Kg 247.02 247.02 246.77 246.77 246.42 246.42 246.28 246.28 246.49 246.49 246.84 246.84 247.01 247.01 246.64 472.72
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
18 Kapur M3 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
19 Pasir Beton (Kasar) M3 417,732.70 417,732.70 417,310.52 417,310.52 416,703.47 416,703.47 416,474.43 416,474.43 416,827.19 416,827.19 417,425.55 417,425.55 417,713.47 417,713.47 417,076.68 799,389.99
20 Pasir Halus (untuk HRS) M3 215,178.25 215,178.25 214,960.77 214,960.77 214,648.08 214,648.08 214,530.10 214,530.10 214,711.81 214,711.81 215,020.03 215,020.03 215,168.34 215,168.34 214,840.32 411,773.69
21 Pasir Pasang (Sedang) M3 295,224.55 295,224.55 294,926.18 294,926.18 294,497.16 294,497.16 294,335.29 294,335.29 294,584.60 294,584.60 295,007.48 295,007.48 295,210.96 295,210.96 294,760.92 564,953.50
22 Pasir Urug M3 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 343,968.29
23 Pasir Urug (ada unsur lempung) M3 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
24 Sirtu M3 267,777.37 267,777.37 267,506.74 267,506.74 267,117.61 267,117.61 266,970.79 266,970.79 267,196.92 267,196.92 267,580.48 267,580.48 267,765.05 267,765.05 267,356.85 512,429.48
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 61,254.07 61,254.07 61,192.17 61,192.17 61,103.15 61,103.15 61,069.57 61,069.57 61,121.29 61,121.29 61,209.03 61,209.03 61,251.25 61,251.25 61,157.88 117,218.24
26 Anti Pengelupas Liter 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
27 Arbocell Kg 124,516.48 124,516.48 124,390.64 124,390.64 124,209.69 124,209.69 124,141.42 124,141.42 124,246.57 124,246.57 124,424.92 124,424.92 124,510.75 124,510.75 124,320.93 238,279.71
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
34 Aspal Modifikasi (Retona) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
35 Aspal Modifikasi (Starbit) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
36 Aspal Minyak (Curah) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
37 Assetilline Botol 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17 136,351.99 261,339.03
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
40 Beton B-0 M3 519,014.31 519,014.31 518,489.76 518,489.76 517,735.53 517,735.53 517,450.96 517,450.96 517,889.25 517,889.25 518,632.68 518,632.68 518,990.42 518,990.42 518,199.23 993,206.51
41 Beton K-125 (fc' 10 MPa) M3 536,608.01 536,608.01 536,065.68 536,065.68 535,285.88 535,285.88 534,991.67 534,991.67 535,444.81 535,444.81 536,213.45 536,213.45 536,583.31 536,583.31 535,765.31 1,026,874.53
42 Beton K-175 (fc' 15 MPa) M3 580,592.28 580,592.28 580,005.50 580,005.50 579,161.78 579,161.78 578,843.45 578,843.45 579,333.73 579,333.73 580,165.37 580,165.37 580,565.55 580,565.55 579,680.49 1,111,044.57
43 Beton K-250 (fc' 20 MPa) M3 646,568.67 646,568.67 645,915.21 645,915.21 644,975.61 644,975.61 644,621.11 644,621.11 645,167.11 645,167.11 646,093.26 646,093.26 646,538.91 646,538.91 645,553.28 1,237,299.63
44 Beton K-300 (fc' 25 MPa) M3 672,959.23 672,959.23 672,279.10 672,279.10 671,301.15 671,301.15 670,932.18 670,932.18 671,500.46 671,500.46 672,464.41 672,464.41 672,928.25 672,928.25 671,902.39 1,287,801.66
45 Beton K-350 (fc' 30 MPa) M3 699,349.79 699,349.79 698,642.98 698,642.98 697,626.68 697,626.68 697,243.24 697,243.24 697,833.81 697,833.81 698,835.56 698,835.56 699,317.59 699,317.59 698,251.50 1,338,303.68
46 Beton K-400 (fc' 35 MPa) M3 725,740.34 725,740.34 725,006.87 725,006.87 723,952.22 723,952.22 723,554.31 723,554.31 724,167.17 724,167.17 725,206.72 725,206.72 725,706.94 725,706.94 724,600.62 1,388,805.71
47 Beton K-450 (fc' 40 MPa) M3 760,927.75 760,927.75 760,158.72 760,158.72 759,052.93 759,052.93 758,635.73 758,635.73 759,278.30 759,278.30 760,368.26 760,368.26 760,892.73 760,892.73 759,732.77 1,456,141.74
48 Beton K-500 (fc' 45 MPa) M3 791,716.74 791,716.74 790,916.58 790,916.58 789,766.06 789,766.06 789,331.97 789,331.97 790,000.54 790,000.54 791,134.60 791,134.60 791,680.29 791,680.29 790,473.40 1,515,060.78
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 57,237.41 57,237.41 57,179.57 57,179.57 57,096.39 57,096.39 57,065.01 57,065.01 57,113.34 57,113.34 57,195.33 57,195.33 57,234.78 57,234.78 57,147.53 109,531.80
51 Cat Anti Karat Kg 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
52 Cat Marka (Non Thermoplas) Kg 57,179.54 57,179.54 57,121.75 57,121.75 57,038.66 57,038.66 57,007.31 57,007.31 57,055.59 57,055.59 57,137.50 57,137.50 57,176.91 57,176.91 57,089.75 109,421.06
53 Cat Marka (Thermoplastic) Kg 39,058.03 39,058.03 39,018.55 39,018.55 38,961.79 38,961.79 38,940.38 38,940.38 38,973.36 38,973.36 39,029.31 39,029.31 39,056.23 39,056.23 38,996.69 74,743.00
54 Cerucuk Diameter 10-15 cm M' 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,147,760.77 1,147,760.77 1,146,600.77 1,146,600.77 1,144,932.84 1,144,932.84 1,144,303.54 1,144,303.54 1,145,272.78 1,145,272.78 1,146,916.84 1,146,916.84 1,147,707.93 1,147,707.93 1,145,958.29 2,196,400.85
57 Curing Compound Liter 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 536,224.19 536,224.19 535,682.25 535,682.25 534,903.01 534,903.01 534,609.00 534,609.00 535,061.82 535,061.82 535,829.91 535,829.91 536,199.51 536,199.51 535,382.09 1,026,140.03
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 624,590.72 624,590.72 623,959.48 623,959.48 623,051.82 623,051.82 622,709.36 622,709.36 623,236.81 623,236.81 624,131.47 624,131.47 624,561.97 624,561.97 623,609.85 1,195,241.76
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 791,282.14 791,282.14 790,482.42 790,482.42 789,332.53 789,332.53 788,898.68 788,898.68 789,566.89 789,566.89 790,700.32 790,700.32 791,245.71 791,245.71 790,039.48 1,514,229.11
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
64 Oxygen (Isi 6 M3) Botol 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
65 Polytene 125 Mikron Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
66 Sand Sheet Ton 1,214,035.67 1,214,035.67 1,212,808.69 1,212,808.69 1,211,044.45 1,211,044.45 1,210,378.81 1,210,378.81 1,211,404.02 1,211,404.02 1,213,143.00 1,213,143.00 1,213,979.78 1,213,979.78 1,212,129.11 2,323,227.14
67 Seal Coat M2 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
68 Seal Guard Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
69 Semen/PC (50 kg) Zak 75,312.39 75,312.39 75,236.27 75,236.27 75,126.83 75,126.83 75,085.53 75,085.53 75,149.13 75,149.13 75,257.01 75,257.01 75,308.92 75,308.92 75,194.11 144,120.79
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
77 Baja Tulangan (Polos) U25 Kg 8,954.72 8,954.72 8,945.67 8,945.67 8,932.66 8,932.66 8,927.75 8,927.75 8,935.31 8,935.31 8,948.13 8,948.13 8,954.31 8,954.31 8,940.66 17,136.11
78 Baja Tulangan (Polos) U32 Kg 8,954.72 8,954.72 8,945.67 8,945.67 8,932.66 8,932.66 8,927.75 8,927.75 8,935.31 8,935.31 8,948.13 8,948.13 8,954.31 8,954.31 8,940.66 17,136.11
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 11,435,432.74 11,435,432.74 11,423,875.43 11,423,875.43 11,407,257.39 11,407,257.39 11,400,987.52 11,400,987.52 11,410,644.29 11,410,644.29 11,427,024.43 11,427,024.43 11,434,906.34 11,434,906.34 11,417,474.15 21,883,300.84
87 Box Culvert Type DUB 200×200 M' 12,139,352.51 12,139,352.51 12,127,083.77 12,127,083.77 12,109,442.80 12,109,442.80 12,102,786.98 12,102,786.98 12,113,038.19 12,113,038.19 12,130,426.62 12,130,426.62 12,138,793.70 12,138,793.70 12,120,288.47 23,230,349.83
88 Box Culvert Type uk 300×200 M' 13,107,367.71 13,107,367.71 13,094,120.65 13,094,120.65 13,075,072.95 13,075,072.95 13,067,886.37 13,067,886.37 13,078,955.04 13,078,955.04 13,097,730.06 13,097,730.06 13,106,764.35 13,106,764.35 13,086,783.47 25,082,782.40
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
91 Ducting (Strand Prestress) M' 148,616.44 148,616.44 148,466.24 148,466.24 148,250.27 148,250.27 148,168.79 148,168.79 148,294.29 148,294.29 148,507.17 148,507.17 148,609.60 148,609.60 148,383.05 284,398.36
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 1,913,938.78 1,913,938.78 1,912,004.44 1,912,004.44 1,909,223.09 1,909,223.09 1,908,173.71 1,908,173.71 1,909,789.96 1,909,789.96 1,912,531.49 1,912,531.49 1,913,850.67 1,913,850.67 1,910,933.06 3,662,589.69
94 Expansion Join Tipe Rubber M' 1,385,747.91 1,385,747.91 1,384,347.39 1,384,347.39 1,382,333.61 1,382,333.61 1,381,573.83 1,381,573.83 1,382,744.04 1,382,744.04 1,384,728.99 1,384,728.99 1,385,684.12 1,385,684.12 1,383,571.68 2,651,822.55
95 Expansion Join Tipe Torma M' 1,589,593.43 1,589,593.43 1,587,986.90 1,587,986.90 1,585,676.89 1,585,676.89 1,584,805.34 1,584,805.34 1,586,147.69 1,586,147.69 1,588,424.63 1,588,424.63 1,589,520.26 1,589,520.26 1,587,097.08 3,041,909.49
96 Expansion Tipe Joint Asphaltic Plug M' 1,885,822.15 1,885,822.15 1,883,916.23 1,883,916.23 1,881,175.74 1,881,175.74 1,880,141.78 1,880,141.78 1,881,734.28 1,881,734.28 1,884,435.54 1,884,435.54 1,885,735.34 1,885,735.34 1,882,860.60 3,608,784.60
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
99 Glass Bead Kg 61,254.07 61,254.07 61,192.17 61,192.17 61,103.15 61,103.15 61,069.57 61,069.57 61,121.29 61,121.29 61,209.03 61,209.03 61,251.25 61,251.25 61,157.88 117,218.24
100 Joint Sealent Kg 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
101 Joint Socket Pile 16×16×16 Set 80,333.21 80,333.21 80,252.02 80,252.02 80,135.28 80,135.28 80,091.24 80,091.24 80,159.07 80,159.07 80,274.14 80,274.14 80,329.51 80,329.51 80,207.05 153,728.84
102 Joint Socket Pile 35×35 Set 687,853.13 687,853.13 687,157.94 687,157.94 686,158.35 686,158.35 685,781.21 685,781.21 686,362.08 686,362.08 687,347.36 687,347.36 687,821.46 687,821.46 686,772.90 1,316,303.22
103 Kawat Beton Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
104 Kawat Bronjong Kg 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
105 Kawat Las Dos 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
106 Kayu Acuan (Kelas III/Meranti) M3 3,782,690.12 3,782,690.12 3,778,867.12 3,778,867.12 3,773,370.09 3,773,370.09 3,771,296.10 3,771,296.10 3,774,490.43 3,774,490.43 3,779,908.77 3,779,908.77 3,782,516.00 3,782,516.00 3,776,749.66 7,238,706.91
107 Kayu Perancah (Gelam) M3 2,437,108.82 2,437,108.82 2,434,645.74 2,434,645.74 2,431,104.12 2,431,104.12 2,429,767.89 2,429,767.89 2,431,825.93 2,431,825.93 2,435,316.85 2,435,316.85 2,436,996.64 2,436,996.64 2,433,281.50 4,663,748.78
108 Kerb Pracetak Type 1 (Peninggi) Buah 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 83,345.71 83,345.71 83,261.47 83,261.47 83,140.36 83,140.36 83,094.66 83,094.66 83,165.04 83,165.04 83,284.42 83,284.42 83,341.87 83,341.87 83,214.82 159,493.67
110 Marmer Nama Jembatan Buah 528,190.87 528,190.87 527,657.05 527,657.05 526,889.48 526,889.48 526,599.88 526,599.88 527,045.92 527,045.92 527,802.50 527,802.50 528,166.56 528,166.56 527,361.38 1,010,767.14
111 Mata Kucing Buah 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
112 Matras Concrete (Tebal=10 cm) M2 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 245,966.15
113 Mini Pile 16×16×16 M' 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 228,671.65
114 Mini Timber Pile Buah 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
115 Multipleks 12 mm Lbr 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
116 Paku Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
117 Paving Block (Model Bata 8 cm) M2 83,345.71 83,345.71 83,261.47 83,261.47 83,140.36 83,140.36 83,094.66 83,094.66 83,165.04 83,165.04 83,284.42 83,284.42 83,341.87 83,341.87 83,214.82 159,493.67
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 58,479,565.89 58,479,565.89 58,420,463.05 58,420,463.05 58,335,480.21 58,335,480.21 58,303,416.75 58,303,416.75 58,352,800.46 58,352,800.46 58,436,566.71 58,436,566.71 58,476,873.93 58,476,873.93 58,387,727.63 111,908,833.10
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 82,846,637.44 82,846,637.44 82,762,907.82 82,762,907.82 82,642,514.61 82,642,514.61 82,597,091.06 82,597,091.06 82,667,051.82 82,667,051.82 82,785,721.50 82,785,721.50 82,842,823.81 82,842,823.81 82,716,532.32 158,538,634.49
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 158,343,790.13 158,343,790.13 158,183,758.72 158,183,758.72 157,953,652.62 157,953,652.62 157,866,835.12 157,866,835.12 158,000,550.28 158,000,550.28 158,227,362.24 158,227,362.24 158,336,501.19 158,336,501.19 158,095,121.78 303,013,001.43
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 207,642,274.05 207,642,274.05 207,432,418.73 207,432,418.73 207,130,671.78 207,130,671.78 207,016,824.68 207,016,824.68 207,192,170.49 207,192,170.49 207,489,597.69 207,489,597.69 207,632,715.78 207,632,715.78 207,316,185.72 397,352,549.35
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 264,688,896.27 264,688,896.27 264,421,386.32 264,421,386.32 264,036,738.90 264,036,738.90 263,891,613.99 263,891,613.99 264,115,133.46 264,115,133.46 264,494,274.35 264,494,274.35 264,676,712.00 264,676,712.00 264,273,220.02 506,519,244.21
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 319,346,609.59 319,346,609.59 319,023,859.39 319,023,859.39 318,559,783.07 318,559,783.07 318,384,690.17 318,384,690.17 318,654,365.94 318,654,365.94 319,111,798.65 319,111,798.65 319,331,909.30 319,331,909.30 318,845,097.05 611,114,427.58
124 Pelat Rambu (Eng. Grade) Buah 184,766.39 184,766.39 184,579.65 184,579.65 184,311.15 184,311.15 184,209.84 184,209.84 184,365.87 184,365.87 184,630.53 184,630.53 184,757.88 184,757.88 184,476.22 353,576.34
125 Pelat Rambu (High L Grade) Buah 215,895.51 215,895.51 215,677.31 215,677.31 215,363.57 215,363.57 215,245.20 215,245.20 215,427.51 215,427.51 215,736.76 215,736.76 215,885.57 215,885.57 215,556.46 413,146.27
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
128 Pipa Drainase Baja Dia 3" M' 242,003.80 242,003.80 241,759.22 241,759.22 241,407.54 241,407.54 241,274.85 241,274.85 241,479.21 241,479.21 241,825.86 241,825.86 241,992.66 241,992.66 241,623.75 463,108.14
129 Pipa Galvanis Dia 1,5" M' 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
130 Pipa Galvanis Dia 2" M' 277,149.58 277,149.58 276,869.48 276,869.48 276,466.72 276,466.72 276,314.77 276,314.77 276,548.81 276,548.81 276,945.80 276,945.80 277,136.82 277,136.82 276,714.34 530,364.51
131 Pipa Galvanis Dia 3" M' 211,878.85 211,878.85 211,664.71 211,664.71 211,356.81 211,356.81 211,240.64 211,240.64 211,419.56 211,419.56 211,723.06 211,723.06 211,869.09 211,869.09 211,546.11 405,459.82
132 Pipa Porus M' 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
133 Pipa PVC Dia 4" M' 230,957.98 230,957.98 230,724.57 230,724.57 230,388.94 230,388.94 230,262.30 230,262.30 230,457.34 230,457.34 230,788.16 230,788.16 230,947.35 230,947.35 230,595.28 441,970.42
134 Plastik Filter M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
135 Rel Pengaman M' 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,806,493.11 1,806,493.11 1,804,667.36 1,804,667.36 1,802,042.15 1,802,042.15 1,801,051.68 1,801,051.68 1,802,577.19 1,802,577.19 1,805,164.82 1,805,164.82 1,806,409.95 1,806,409.95 1,803,656.13 3,456,977.36
137 Strip Bearing Buah 277,149.58 277,149.58 276,869.48 276,869.48 276,466.72 276,466.72 276,314.77 276,314.77 276,548.81 276,548.81 276,945.80 276,945.80 277,136.82 277,136.82 276,714.34 530,364.51
138 Tiang Pancang Baja Diameter 400 M' 640,657.37 640,657.37 640,009.88 640,009.88 639,078.87 639,078.87 638,727.61 638,727.61 639,268.62 639,268.62 640,186.30 640,186.30 640,627.88 640,627.88 639,651.26 1,225,987.53
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 782,244.65 782,244.65 781,454.07 781,454.07 780,317.31 780,317.31 779,888.42 779,888.42 780,548.99 780,548.99 781,669.48 781,669.48 782,208.64 782,208.64 781,016.19 1,496,934.61
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,635,785.03 1,635,785.03 1,634,131.81 1,634,131.81 1,631,754.68 1,631,754.68 1,630,857.80 1,630,857.80 1,632,239.16 1,632,239.16 1,634,582.26 1,634,582.26 1,635,709.73 1,635,709.73 1,633,216.14 3,130,303.57
HARGA SATUAN DASAR UPAH KABUPATEN LAMONGAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
2 Tukang OH 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
3 Mandor OH 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
4 Operator OH 318,000 318,000 318,860.40 318,860.40 319,299.98 319,299.98 319,308.86 319,308.86 318,887.14 318,887.14 318,431.63 318,431.63 318,362.70 318,362.70 318,736.44 318,736.44 319,199.99 319,199.99
5 Pembantu Operator OH 199,000 199,000 199,538.43 199,538.43 199,813.51 199,813.51 199,819.07 199,819.07 199,555.16 199,555.16 199,270.11 199,270.11 199,226.97 199,226.97 199,460.85 199,460.85 199,750.94 199,750.94
6 Sopir OH 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
7 Pembantu Sopir OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
8 Mekanik OH 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
9 Pembantu Mekanik OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
10 Kepala Tukang OH 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
11 Pemasak Aspal OH 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26

HARGA SATUAN DASAR ALAT KABUPATEN LAMONGAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 467,963 523,000 469,228.68 524,415.06 469,875.55 525,138.01 469,888.63 525,152.63 469,268.03 524,459.03 468,597.72 523,709.89 468,496.28 523,596.52 469,046.26 524,211.18 469,728.41 524,973.57
2 Asphalt Distribution Unit/Jam 288,130 371,000 288,909.38 372,003.80 289,307.66 372,516.64 289,315.72 372,527.01 288,933.61 372,034.99 288,520.89 371,503.57 288,458.43 371,423.15 288,797.06 371,859.18 289,217.07 372,399.99
3 Asphalt Finisher Unit/Jam 211,626 1,003,000 212,198.96 1,005,713.77 212,491.49 1,007,100.24 212,497.41 1,007,128.27 212,216.75 1,005,798.11 211,913.62 1,004,361.41 211,867.74 1,004,143.99 212,116.46 1,005,322.79 212,424.95 1,006,784.87
4 Asphalt Liquid Mixer Unit/Jam 75,510 138,000 75,714.18 138,373.38 75,818.56 138,564.14 75,820.67 138,568.00 75,720.53 138,384.98 75,612.37 138,187.31 75,596.00 138,157.40 75,684.75 138,319.59 75,794.82 138,520.75
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 101,342 101,342 101,616.40 101,616.40 101,756.49 101,756.49 101,759.32 101,759.32 101,624.92 101,624.92 101,479.76 101,479.76 101,457.79 101,457.79 101,576.90 101,576.90 101,724.62 101,724.62
6 Asphalt Mixing Plant Unit/Jam 1,132,648 5,809,888 1,135,712.73 5,825,607.54 1,137,278.41 5,833,638.66 1,137,310.07 5,833,801.05 1,135,807.97 5,826,096.07 1,134,185.56 5,817,774.00 1,133,940.04 5,816,514.60 1,135,271.20 5,823,342.77 1,136,922.27 5,831,811.89
7 Asphalt Sprayer Unit/Jam 93,394 93,394 93,646.49 93,646.49 93,775.59 93,775.59 93,778.20 93,778.20 93,654.34 93,654.34 93,520.56 93,520.56 93,500.32 93,500.32 93,610.08 93,610.08 93,746.22 93,746.22
8 Asphalt Tanker Unit/Jam 437,162 507,000 438,345.26 508,371.77 438,949.56 509,072.60 438,961.78 509,086.77 438,382.02 508,414.40 437,755.83 507,688.17 437,661.07 507,578.27 438,174.85 508,174.13 438,812.11 508,913.19
9 Blending Equipment Unit/Jam 142,078 225,000 142,462.21 225,608.77 142,658.61 225,919.79 142,662.58 225,926.08 142,474.16 225,627.69 142,270.65 225,305.40 142,239.85 225,256.63 142,406.83 225,521.06 142,613.93 225,849.05
10 Bore Pile Machine Unit/Jam 391,459 681,000 392,518.26 682,842.55 393,059.38 683,783.91 393,070.32 683,802.94 392,551.17 682,899.81 391,990.45 681,924.35 391,905.59 681,776.73 392,365.66 682,577.09 392,936.29 683,569.79
11 Bore Pile Machine Dia 60 Unit/Jam 256,336 774,970 257,029.72 777,066.80 257,384.06 778,138.06 257,391.23 778,159.72 257,051.28 777,131.96 256,684.10 776,021.90 256,628.54 775,853.91 256,929.80 776,764.71 257,303.46 777,894.39
12 Bore Pile Machine Dia 80 Unit/Jam 1,013,422 1,013,422 1,016,164.02 1,016,164.02 1,017,564.89 1,017,564.89 1,017,593.22 1,017,593.22 1,016,249.23 1,016,249.23 1,014,797.61 1,014,797.61 1,014,577.93 1,014,577.93 1,015,768.97 1,015,768.97 1,017,246.25 1,017,246.25
13 Bulldozer 100-150 HP Unit/Jam 397,420 576,000 398,495.69 577,558.46 399,045.05 578,354.67 399,056.16 578,370.77 398,529.11 577,606.89 397,959.85 576,781.83 397,873.70 576,656.97 398,340.77 577,333.92 398,920.10 578,173.56
14 Cement Tanker Unit/Jam 369,601 477,000 370,600.99 478,290.60 371,111.90 478,949.96 371,122.23 478,963.30 370,632.07 478,330.71 370,102.66 477,647.45 370,022.54 477,544.05 370,456.92 478,104.66 370,995.69 478,799.98
15 Cold Milling Unit/Jam 577,253 1,228,000 578,814.99 1,231,322.54 579,612.94 1,233,020.03 579,629.08 1,233,054.35 578,863.53 1,231,425.80 578,036.68 1,229,666.81 577,911.55 1,229,400.62 578,589.97 1,230,843.85 579,431.44 1,232,633.92
16 Cold Recycler Unit/Jam 4,861,445 4,861,445 4,874,598.57 4,874,598.57 4,881,318.63 4,881,318.63 4,881,454.52 4,881,454.52 4,875,007.35 4,875,007.35 4,868,043.82 4,868,043.82 4,866,990.01 4,866,990.01 4,872,703.51 4,872,703.51 4,879,790.08 4,879,790.08
17 Compressor 4000-6500 L\M Unit/Jam 148,039 180,000 148,439.65 180,487.02 148,644.28 180,735.83 148,648.42 180,740.87 148,452.09 180,502.15 148,240.04 180,244.32 148,207.95 180,205.30 148,381.94 180,416.85 148,597.74 180,679.24
18 Concrete Breaker Unit/Jam 539,498 1,028,000 540,957.90 1,030,781.41 541,703.66 1,032,202.43 541,718.74 1,032,231.17 541,003.27 1,030,867.85 540,230.49 1,029,395.35 540,113.55 1,029,172.51 540,747.60 1,030,380.68 541,534.03 1,031,879.21
19 Concrete Mixer (350) Unit/Jam 100,349 100,349 100,620.16 100,620.16 100,758.88 100,758.88 100,761.68 100,761.68 100,628.60 100,628.60 100,484.86 100,484.86 100,463.11 100,463.11 100,581.05 100,581.05 100,727.32 100,727.32
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 114,258 114,258 114,567.51 114,567.51 114,725.45 114,725.45 114,728.65 114,728.65 114,577.12 114,577.12 114,413.46 114,413.46 114,388.69 114,388.69 114,522.97 114,522.97 114,689.53 114,689.53
21 Concrete Pan Mixer Unit/Jam 304,027 651,000 304,849.21 652,761.38 305,269.47 653,661.27 305,277.96 653,679.47 304,874.77 652,816.12 304,439.28 651,883.63 304,373.38 651,742.51 304,730.69 652,507.61 305,173.87 653,456.58
22 Concrete Pump Unit/Jam 231,497 248,388 232,123.74 249,060.05 232,443.74 249,403.40 232,450.22 249,410.35 232,143.21 249,080.94 231,811.61 248,725.15 231,761.43 248,671.30 232,033.50 248,963.23 232,370.96 249,325.30
23 Concrete Vibrator Unit/Jam 86,439 86,439 86,672.81 86,672.81 86,792.30 86,792.30 86,794.72 86,794.72 86,680.08 86,680.08 86,556.27 86,556.27 86,537.53 86,537.53 86,639.12 86,639.12 86,765.12 86,765.12
24 Crane 10-15 Ton Unit/Jam 309,988 309,988 310,826.64 310,826.64 311,255.14 311,255.14 311,263.81 311,263.81 310,852.71 310,852.71 310,408.68 310,408.68 310,341.48 310,341.48 310,705.80 310,705.80 311,157.68 311,157.68
25 Crane On Track 35 Ton Unit/Jam 257,330 488,827 258,025.96 490,149.60 258,381.67 490,825.31 258,388.87 490,838.97 258,047.60 490,190.70 257,679.00 489,490.50 257,623.22 489,384.54 257,925.65 489,959.04 258,300.76 490,671.61
26 Crane On Track 75-100 Ton Unit/Jam 404,375 613,000 405,469.37 614,658.57 406,028.34 615,505.93 406,039.65 615,523.06 405,503.37 614,710.11 404,924.14 613,832.05 404,836.49 613,699.17 405,311.74 614,419.61 405,901.20 615,313.18
27 Dump Truck 10 Ton Unit/Jam 382,517 411,000 383,552.10 412,112.02 384,080.87 412,680.16 384,091.56 412,691.64 383,584.27 412,146.58 383,036.35 411,557.87 382,953.43 411,468.78 383,402.99 411,951.81 383,960.59 412,550.93
28 Dump Truck 3-4 M3 Unit/Jam 208,646 212,000 209,210.24 212,573.60 209,498.65 212,866.65 209,504.49 212,872.58 209,227.78 212,591.42 208,928.92 212,287.76 208,883.69 212,241.80 209,128.91 212,490.96 209,433.05 212,799.99
29 Excavator 80-140 HP Unit/Jam 302,040 480,000 302,856.73 481,298.71 303,274.24 481,962.23 303,282.68 481,975.64 302,882.12 481,339.07 302,449.48 480,651.52 302,384.01 480,547.47 302,738.99 481,111.60 303,179.27 481,811.30
30 Flat Bed Truck 3-4 M3 Unit/Jam 366,620 490,000 367,612.28 491,325.77 368,119.06 492,003.11 368,129.31 492,016.80 367,643.10 491,366.97 367,117.96 490,665.10 367,038.49 490,558.88 367,469.36 491,134.76 368,003.79 491,849.04
31 Fulvi Mixer Unit/Jam 918,041 1,434,000 920,525.05 1,437,879.91 921,794.08 1,439,862.15 921,819.74 1,439,902.23 920,602.25 1,438,000.49 919,287.25 1,435,946.43 919,088.24 1,435,635.58 920,167.19 1,437,320.91 921,505.42 1,439,411.27
32 Generator Set Unit/Jam 408,349 433,000 409,454.32 434,171.55 410,018.79 434,770.09 410,030.21 434,782.19 409,488.66 434,207.96 408,903.74 433,587.73 408,815.22 433,493.87 409,295.14 434,002.76 409,890.40 434,633.95
33 Hot Recycler Unit/Jam 2,999,531 8,796,000 3,007,646.25 8,819,798.93 3,011,792.55 8,831,957.80 3,011,876.39 8,832,203.66 3,007,898.46 8,820,538.54 3,003,601.94 8,807,939.17 3,002,951.74 8,806,032.48 3,006,476.99 8,816,370.12 3,010,849.43 8,829,192.12
34 Jack Hammer Unit/Jam 56,632 95,000 56,785.64 95,257.04 56,863.92 95,388.36 56,865.50 95,391.01 56,790.40 95,265.03 56,709.28 95,128.95 56,697.00 95,108.35 56,763.56 95,220.00 56,846.11 95,358.49
35 Launching Gantry Unit/Jam 72,071,198 72,071,198 72,266,197.75 72,266,197.75 72,365,823.10 72,365,823.10 72,367,837.58 72,367,837.58 72,272,257.89 72,272,257.89 72,169,023.25 72,169,023.25 72,153,400.50 72,153,400.50 72,238,103.40 72,238,103.40 72,343,162.14 72,343,162.14
36 Motor Grader > 100 HP Unit/Jam 283,162 476,000 283,928.18 477,287.89 284,319.60 477,945.87 284,327.52 477,959.18 283,951.99 477,327.92 283,546.39 476,646.09 283,485.01 476,542.91 283,817.80 477,102.34 284,230.57 477,796.21
37 Pedestrian Roller Unit/Jam 93,394 93,394 93,646.49 93,646.49 93,775.59 93,775.59 93,778.20 93,778.20 93,654.34 93,654.34 93,520.56 93,520.56 93,500.32 93,500.32 93,610.08 93,610.08 93,746.22 93,746.22
38 Pile Driver + Hammer Unit/Jam 106,310 311,000 106,597.60 311,841.46 106,744.55 312,271.36 106,747.52 312,280.05 106,606.54 311,867.61 106,454.26 311,422.13 106,431.21 311,354.72 106,556.16 311,720.23 106,711.13 312,173.57
39 Rock Drill Breaker Unit/Jam 103,329 336,000 103,608.88 336,909.10 103,751.71 337,373.56 103,754.60 337,382.95 103,617.57 336,937.35 103,469.56 336,456.07 103,447.16 336,383.23 103,568.60 336,778.12 103,719.23 337,267.91
40 Split Form Paver Unit/Jam 218,581 218,581 219,172.63 219,172.63 219,474.78 219,474.78 219,480.89 219,480.89 219,191.01 219,191.01 218,877.92 218,877.92 218,830.53 218,830.53 219,087.43 219,087.43 219,406.05 219,406.05
41 Stone Crusher Unit/Jam 585,202 729,266 586,784.91 731,239.14 587,593.84 732,247.22 587,610.20 732,267.60 586,834.12 731,300.46 585,995.87 730,255.86 585,869.02 730,097.78 586,556.79 730,954.86 587,409.84 732,017.92
42 Tamper Unit/Jam 87,432 87,432 87,669.05 87,669.05 87,789.91 87,789.91 87,792.36 87,792.36 87,676.40 87,676.40 87,551.17 87,551.17 87,532.21 87,532.21 87,634.97 87,634.97 87,762.42 87,762.42
43 Tandem Roller 6-8 T Unit/Jam 422,259 493,000 423,401.67 494,333.89 423,985.37 495,015.37 423,997.17 495,029.15 423,437.18 494,375.34 422,832.34 493,669.17 422,740.80 493,562.30 423,237.07 494,141.71 423,852.60 494,860.36
44 Three Wheel Roller 6-8 T Unit/Jam 140,091 184,401 140,469.73 184,899.93 140,663.38 185,154.83 140,667.30 185,159.98 140,481.51 184,915.43 140,280.85 184,651.29 140,250.48 184,611.32 140,415.12 184,828.04 140,619.33 185,096.85
45 Tire Roller 8-10 T Unit/Jam 250,375 452,000 251,052.29 453,222.96 251,398.38 453,847.76 251,405.38 453,860.40 251,073.34 453,260.96 250,714.70 452,613.52 250,660.43 452,515.54 250,954.69 453,046.76 251,319.66 453,705.64
46 Track Loader 75-100 HP Unit/Jam 234,478 310,000 235,112.46 310,838.75 235,436.58 311,267.27 235,443.14 311,275.94 235,132.18 310,864.82 234,796.31 310,420.78 234,745.48 310,353.58 235,021.06 310,717.91 235,362.86 311,169.80
47 Trailer 20 Ton Unit/Jam 378,543 523,601 379,567.15 525,017.68 380,090.41 525,741.47 380,101.00 525,756.10 379,598.98 525,061.71 379,056.75 524,311.70 378,974.70 524,198.20 379,419.59 524,813.58 379,971.39 525,576.83
48 Trailler 15 Ton Unit/Jam 327,872 499,000 328,758.95 500,350.12 329,212.17 501,039.90 329,221.33 501,053.85 328,786.52 500,392.08 328,316.87 499,677.31 328,245.80 499,569.15 328,631.14 500,155.60 329,109.08 500,883.00
49 Truck Mixer (agitator) Unit/Jam 412,324 606,066 413,439.28 607,705.80 414,009.24 608,543.58 414,020.77 608,560.52 413,473.95 607,756.77 412,883.34 606,888.64 412,793.96 606,757.26 413,278.55 607,469.55 413,879.60 608,353.02
50 Vibrating Rammer Unit/Jam 84,452 84,452 84,680.33 84,680.33 84,797.07 84,797.07 84,799.43 84,799.43 84,687.44 84,687.44 84,566.47 84,566.47 84,548.16 84,548.16 84,647.41 84,647.41 84,770.52 84,770.52
51 Vibratory Roller 5-8 T Unit/Jam 203,678 437,000 204,229.04 438,182.37 204,510.59 438,786.44 204,516.28 438,798.66 204,246.17 438,219.12 203,954.42 437,593.16 203,910.27 437,498.43 204,149.65 438,012.02 204,446.55 438,649.04
52 Water Pump 70-100 MM Unit/Jam 63,587 63,587 63,759.31 63,759.31 63,847.21 63,847.21 63,848.99 63,848.99 63,764.66 63,764.66 63,673.58 63,673.58 63,659.79 63,659.79 63,734.52 63,734.52 63,827.22 63,827.22
53 Water Tanker 3000-4500 L Unit/Jam 230,504 230,504 231,127.50 231,127.50 231,446.13 231,446.13 231,452.57 231,452.57 231,146.88 231,146.88 230,816.71 230,816.71 230,766.74 230,766.74 231,037.65 231,037.65 231,373.66 231,373.66
54 Welding Set Unit/Jam 129,162 129,162 129,511.10 129,511.10 129,689.64 129,689.64 129,693.25 129,693.25 129,521.96 129,521.96 129,336.95 129,336.95 129,308.95 129,308.95 129,460.75 129,460.75 129,649.03 129,649.03
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 224,543 400,000 225,150.07 401,082.26 225,460.46 401,635.19 225,466.73 401,646.37 225,168.95 401,115.90 224,847.31 400,542.94 224,798.64 400,456.23 225,062.54 400,926.34 225,389.85 401,509.42
HARGA SATUAN DASAR BAHAN KABUPATEN LAMONGAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
2 Agregat Pecah Mesin 20-30 mm M3 360,000 360,000 360,974.04 360,974.04 361,471.67 361,471.67 361,481.73 361,481.73 361,004.31 361,004.31 360,488.64 360,488.64 360,410.61 360,410.61 360,833.70 360,833.70 361,358.48 361,358.48
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 375,000 375,000 376,014.62 376,014.62 376,532.99 376,532.99 376,543.47 376,543.47 376,046.15 376,046.15 375,509.00 375,509.00 375,427.71 375,427.71 375,868.44 375,868.44 376,415.08 376,415.08
4 Bahan Agr. Base Kelas A M3 328,000 328,000 328,887.45 328,887.45 329,340.85 329,340.85 329,350.02 329,350.02 328,915.03 328,915.03 328,445.21 328,445.21 328,374.11 328,374.11 328,759.60 328,759.60 329,237.72 329,237.72
5 Bahan Agr. Base Kelas B M3 308,000 308,000 308,833.34 308,833.34 309,259.10 309,259.10 309,267.70 309,267.70 308,859.24 308,859.24 308,418.06 308,418.06 308,351.30 308,351.30 308,713.28 308,713.28 309,162.25 309,162.25
6 Bahan Agr. Base Kelas C M3 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
7 Bahan Agr. Base Kelas C2 M3 258,000 258,000 258,698.06 258,698.06 259,054.70 259,054.70 259,061.91 259,061.91 258,719.75 258,719.75 258,350.19 258,350.19 258,294.27 258,294.27 258,597.49 258,597.49 258,973.58 258,973.58
8 Bahan Agr. Base Kelas S M3 209,000 209,000 209,565.48 209,565.48 209,854.39 209,854.39 209,860.23 209,860.23 209,583.06 209,583.06 209,283.68 209,283.68 209,238.38 209,238.38 209,484.01 209,484.01 209,788.67 209,788.67
9 Bahan Pilihan M3 209,000 209,000 209,565.48 209,565.48 209,854.39 209,854.39 209,860.23 209,860.23 209,583.06 209,583.06 209,283.68 209,283.68 209,238.38 209,238.38 209,484.01 209,484.01 209,788.67 209,788.67
10 Bahan Tanah Timbunan M3 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
11 Batu Belah/Kerakal M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
12 Batu Kali M3 348,000 348,000 348,941.57 348,941.57 349,422.61 349,422.61 349,432.34 349,432.34 348,970.83 348,970.83 348,472.35 348,472.35 348,396.92 348,396.92 348,805.91 348,805.91 349,313.19 349,313.19
13 Chipping M3 221,000 221,000 221,597.95 221,597.95 221,903.44 221,903.44 221,909.62 221,909.62 221,616.53 221,616.53 221,299.97 221,299.97 221,252.07 221,252.07 221,511.80 221,511.80 221,833.95 221,833.95
14 Chipping (kg) Kg 271 271 271.73 271.73 272.11 272.11 272.12 272.12 271.76 271.76 271.37 271.37 271.31 271.31 271.63 271.63 272.02 272.02
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 397,000 397,000 398,074.14 398,074.14 398,622.92 398,622.92 398,634.02 398,634.02 398,107.53 398,107.53 397,538.86 397,538.86 397,452.81 397,452.81 397,919.39 397,919.39 398,498.10 398,498.10
18 Kapur M3 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
19 Pasir Beton (Kasar) M3 472,000 472,000 473,277.07 473,277.07 473,929.52 473,929.52 473,942.72 473,942.72 473,316.76 473,316.76 472,640.66 472,640.66 472,538.35 472,538.35 473,093.08 473,093.08 473,781.11 473,781.11
20 Pasir Halus (untuk HRS) M3 229,000 229,000 229,619.59 229,619.59 229,936.15 229,936.15 229,942.55 229,942.55 229,638.85 229,638.85 229,310.83 229,310.83 229,261.19 229,261.19 229,530.33 229,530.33 229,864.14 229,864.14
21 Pasir Pasang (Sedang) M3 334,000 334,000 334,903.69 334,903.69 335,365.38 335,365.38 335,374.72 335,374.72 334,931.77 334,931.77 334,453.35 334,453.35 334,380.95 334,380.95 334,773.49 334,773.49 335,260.36 335,260.36
22 Pasir Urug M3 203,000 203,000 203,549.25 203,549.25 203,829.86 203,829.86 203,835.53 203,835.53 203,566.32 203,566.32 203,275.54 203,275.54 203,231.54 203,231.54 203,470.12 203,470.12 203,766.03 203,766.03
23 Pasir Urug (ada unsur lempung) M3 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
24 Sirtu M3 250,000 250,000 250,676.41 250,676.41 251,021.99 251,021.99 251,028.98 251,028.98 250,697.43 250,697.43 250,339.34 250,339.34 250,285.14 250,285.14 250,578.96 250,578.96 250,943.39 250,943.39
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
26 Anti Pengelupas Liter 100,000 100,000 100,270.57 100,270.57 100,408.80 100,408.80 100,411.59 100,411.59 100,278.97 100,278.97 100,135.73 100,135.73 100,114.06 100,114.06 100,231.58 100,231.58 100,377.35 100,377.35
27 Arbocell Kg 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
32 Aspal Modifikasi (BNA) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79 155,358.96 155,358.96 155,584.90 155,584.90
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 586,195 586,195 587,781.15 587,781.15 588,591.46 588,591.46 588,607.84 588,607.84 587,830.44 587,830.44 586,990.77 586,990.77 586,863.70 586,863.70 587,552.64 587,552.64 588,407.14 588,407.14
41 Beton K-125 (fc' 10 MPa) M3 606,066 606,066 607,705.93 607,705.93 608,543.71 608,543.71 608,560.65 608,560.65 607,756.89 607,756.89 606,888.77 606,888.77 606,757.39 606,757.39 607,469.68 607,469.68 608,353.15 608,353.15
42 Beton K-175 (fc' 15 MPa) M3 655,744 655,744 657,517.89 657,517.89 658,424.34 658,424.34 658,442.67 658,442.67 657,573.03 657,573.03 656,633.75 656,633.75 656,491.60 656,491.60 657,262.28 657,262.28 658,218.16 658,218.16
43 Beton K-250 (fc' 20 MPa) M3 730,260 730,260 732,235.84 732,235.84 733,245.29 733,245.29 733,265.70 733,265.70 732,297.24 732,297.24 731,251.22 731,251.22 731,092.92 731,092.92 731,951.17 731,951.17 733,015.68 733,015.68
44 Beton K-300 (fc' 25 MPa) M3 760,067 760,067 762,123.01 762,123.01 763,173.67 763,173.67 763,194.91 763,194.91 762,186.92 762,186.92 761,098.21 761,098.21 760,933.45 760,933.45 761,826.73 761,826.73 762,934.68 762,934.68
45 Beton K-350 (fc' 30 MPa) M3 789,873 789,873 792,010.19 792,010.19 793,102.05 793,102.05 793,124.12 793,124.12 792,076.61 792,076.61 790,945.19 790,945.19 790,773.98 790,773.98 791,702.29 791,702.29 792,853.69 792,853.69
46 Beton K-400 (fc' 35 MPa) M3 819,680 819,680 821,897.37 821,897.37 823,030.43 823,030.43 823,053.34 823,053.34 821,966.29 821,966.29 820,792.18 820,792.18 820,614.50 820,614.50 821,577.85 821,577.85 822,772.70 822,772.70
47 Beton K-450 (fc' 40 MPa) M3 859,422 859,422 861,746.94 861,746.94 862,934.93 862,934.93 862,958.95 862,958.95 861,819.20 861,819.20 860,588.17 860,588.17 860,401.87 860,401.87 861,411.92 861,411.92 862,664.71 862,664.71
48 Beton K-500 (fc' 45 MPa) M3 894,196 894,196 896,615.31 896,615.31 897,851.37 897,851.37 897,876.37 897,876.37 896,690.50 896,690.50 895,409.65 895,409.65 895,215.82 895,215.82 896,266.74 896,266.74 897,570.22 897,570.22
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
51 Cat Anti Karat Kg 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
52 Cat Marka (Non Thermoplas) Kg 64,581 64,581 64,755.55 64,755.55 64,844.82 64,844.82 64,846.63 64,846.63 64,760.98 64,760.98 64,668.48 64,668.48 64,654.48 64,654.48 64,730.38 64,730.38 64,824.52 64,824.52
53 Cat Marka (Thermoplastic) Kg 61,000 61,000 61,165.04 61,165.04 61,249.37 61,249.37 61,251.07 61,251.07 61,170.17 61,170.17 61,082.80 61,082.80 61,069.57 61,069.57 61,141.27 61,141.27 61,230.19 61,230.19
54 Cerucuk Diameter 10-15 cm M' 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,297,000 1,297,000 1,300,509.23 1,300,509.23 1,302,302.10 1,302,302.10 1,302,338.35 1,302,338.35 1,300,618.29 1,300,618.29 1,298,760.47 1,298,760.47 1,298,479.32 1,298,479.32 1,300,003.64 1,300,003.64 1,301,894.29 1,301,894.29
57 Curing Compound Liter 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 606,000 606,000 607,639.63 607,639.63 608,477.31 608,477.31 608,494.25 608,494.25 607,690.58 607,690.58 606,822.55 606,822.55 606,691.19 606,691.19 607,403.40 607,403.40 608,286.77 608,286.77
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 705,000 705,000 706,907.49 706,907.49 707,882.02 707,882.02 707,901.73 707,901.73 706,966.77 706,966.77 705,956.93 705,956.93 705,804.10 705,804.10 706,632.67 706,632.67 707,660.35 707,660.35
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 894,000 894,000 896,418.85 896,418.85 897,654.65 897,654.65 897,679.64 897,679.64 896,494.03 896,494.03 895,213.46 895,213.46 895,019.67 895,019.67 896,070.36 896,070.36 897,373.55 897,373.55
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
64 Oxygen (Isi 6 M3) Botol 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,371,000 1,371,000 1,374,709.45 1,374,709.45 1,376,604.61 1,376,604.61 1,376,642.93 1,376,642.93 1,374,824.73 1,374,824.73 1,372,860.91 1,372,860.91 1,372,563.72 1,372,563.72 1,374,175.02 1,374,175.02 1,376,173.53 1,376,173.53
67 Seal Coat M2 109,000 109,000 109,294.92 109,294.92 109,445.59 109,445.59 109,448.64 109,448.64 109,304.08 109,304.08 109,147.95 109,147.95 109,124.32 109,124.32 109,252.43 109,252.43 109,411.32 109,411.32
68 Seal Guard Kg 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
69 Semen/PC (50 kg) Zak 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
78 Baja Tulangan (Polos) U32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
81 Baja Tulangan (Ulir) D19 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
84 Baja Tulangan (Ulir) D36 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,916,000 12,916,000 12,950,946.22 12,950,946.22 12,968,800.24 12,968,800.24 12,969,161.26 12,969,161.26 12,952,032.27 12,952,032.27 12,933,531.41 12,933,531.41 12,930,731.63 12,930,731.63 12,945,911.38 12,945,911.38 12,964,739.14 12,964,739.14
87 Box Culvert Type DUB 200×200 M' 13,711,000 13,711,000 13,748,097.21 13,748,097.21 13,767,050.18 13,767,050.18 13,767,433.42 13,767,433.42 13,749,250.11 13,749,250.11 13,729,610.50 13,729,610.50 13,726,638.39 13,726,638.39 13,742,752.47 13,742,752.47 13,762,739.11 13,762,739.11
88 Box Culvert Type uk 300×200 M' 14,804,000 14,804,000 14,844,054.49 14,844,054.49 14,864,518.33 14,864,518.33 14,864,932.12 14,864,932.12 14,845,299.29 14,845,299.29 14,824,094.07 14,824,094.07 14,820,885.03 14,820,885.03 14,838,283.69 14,838,283.69 14,859,863.59 14,859,863.59
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 192,000 192,000 192,519.49 192,519.49 192,784.89 192,784.89 192,790.26 192,790.26 192,535.63 192,535.63 192,260.61 192,260.61 192,218.99 192,218.99 192,444.64 192,444.64 192,724.52 192,724.52
91 Ducting (Strand Prestress) M' 168,000 168,000 168,454.55 168,454.55 168,686.78 168,686.78 168,691.48 168,691.48 168,468.68 168,468.68 168,228.03 168,228.03 168,191.62 168,191.62 168,389.06 168,389.06 168,633.96 168,633.96
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,162,000 2,162,000 2,167,849.62 2,167,849.62 2,170,838.19 2,170,838.19 2,170,898.63 2,170,898.63 2,168,031.42 2,168,031.42 2,164,934.57 2,164,934.57 2,164,465.92 2,164,465.92 2,167,006.84 2,167,006.84 2,170,158.41 2,170,158.41
94 Expansion Join Tipe Rubber M' 1,565,000 1,565,000 1,569,234.35 1,569,234.35 1,571,397.68 1,571,397.68 1,571,441.42 1,571,441.42 1,569,365.94 1,569,365.94 1,567,124.24 1,567,124.24 1,566,785.00 1,566,785.00 1,568,624.29 1,568,624.29 1,570,905.60 1,570,905.60
95 Expansion Join Tipe Torma M' 1,795,000 1,795,000 1,799,856.65 1,799,856.65 1,802,337.91 1,802,337.91 1,802,388.08 1,802,388.08 1,800,007.58 1,800,007.58 1,797,436.43 1,797,436.43 1,797,047.33 1,797,047.33 1,799,156.93 1,799,156.93 1,801,773.52 1,801,773.52
96 Expansion Tipe Joint Asphaltic Plug M' 2,130,000 2,130,000 2,135,763.04 2,135,763.04 2,138,707.38 2,138,707.38 2,138,766.92 2,138,766.92 2,135,942.14 2,135,942.14 2,132,891.14 2,132,891.14 2,132,429.42 2,132,429.42 2,134,932.74 2,134,932.74 2,138,037.66 2,138,037.66
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
99 Glass Bead Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
100 Joint Sealent Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
101 Joint Socket Pile 16×16×16 Set 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
102 Joint Socket Pile 35×35 Set 777,000 777,000 779,102.29 779,102.29 780,176.35 780,176.35 780,198.07 780,198.07 779,167.63 779,167.63 778,054.65 778,054.65 777,886.22 777,886.22 778,799.41 778,799.41 779,932.05 779,932.05
103 Kawat Beton Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
104 Kawat Bronjong Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
105 Kawat Las Dos 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
106 Kayu Acuan (Kelas III/Meranti) M3 4,272,000 4,272,000 4,283,558.55 4,283,558.55 4,289,463.82 4,289,463.82 4,289,583.22 4,289,583.22 4,283,917.76 4,283,917.76 4,277,798.56 4,277,798.56 4,276,872.53 4,276,872.53 4,281,893.27 4,281,893.27 4,288,120.59 4,288,120.59
107 Kayu Perancah (Gelam) M3 2,752,000 2,752,000 2,759,445.96 2,759,445.96 2,763,250.10 2,763,250.10 2,763,327.02 2,763,327.02 2,759,677.36 2,759,677.36 2,755,735.40 2,755,735.40 2,755,138.86 2,755,138.86 2,758,373.19 2,758,373.19 2,762,384.80 2,762,384.80
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,000 55,000 55,148.81 55,148.81 55,224.84 55,224.84 55,226.38 55,226.38 55,153.44 55,153.44 55,074.65 55,074.65 55,062.73 55,062.73 55,127.37 55,127.37 55,207.55 55,207.55
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
110 Marmer Nama Jembatan Buah 596,000 596,000 597,612.57 597,612.57 598,436.43 598,436.43 598,453.09 598,453.09 597,662.68 597,662.68 596,808.98 596,808.98 596,679.78 596,679.78 597,380.24 597,380.24 598,249.03 598,249.03
111 Mata Kucing Buah 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93 156,361.27 156,361.27 156,588.67 156,588.67
112 Matras Concrete (Tebal=10 cm) M2 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
113 Mini Pile 16×16×16 M' 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
114 Mini Timber Pile Buah 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
115 Multipleks 12 mm Lbr 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
116 Paku Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
117 Paving Block (Model Bata 8 cm) M2 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,050,000 66,050,000 66,228,708.40 66,228,708.40 66,320,010.53 66,320,010.53 66,321,856.72 66,321,856.72 66,234,262.24 66,234,262.24 66,139,652.35 66,139,652.35 66,125,334.81 66,125,334.81 66,202,961.19 66,202,961.19 66,299,242.79 66,299,242.79
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 93,570,000 93,570,000 93,823,167.98 93,823,167.98 93,952,511.52 93,952,511.52 93,955,126.92 93,955,126.92 93,831,035.85 93,831,035.85 93,697,006.37 93,697,006.37 93,676,723.36 93,676,723.36 93,786,693.10 93,786,693.10 93,923,090.81 93,923,090.81
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 178,839,000 178,839,000 179,322,876.33 179,322,876.33 179,570,088.78 179,570,088.78 179,575,087.56 179,575,087.56 179,337,914.08 179,337,914.08 179,081,745.46 179,081,745.46 179,042,978.83 179,042,978.83 179,253,162.41 179,253,162.41 179,513,857.41 179,513,857.41
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 234,519,000 234,519,000 235,153,527.10 235,153,527.10 235,477,707.05 235,477,707.05 235,484,262.16 235,484,262.16 235,173,246.74 235,173,246.74 234,837,322.19 234,837,322.19 234,786,485.91 234,786,485.91 235,062,108.35 235,062,108.35 235,403,968.51 235,403,968.51
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 298,950,000 298,950,000 299,758,855.05 299,758,855.05 300,172,099.16 300,172,099.16 300,180,455.20 300,180,455.20 299,783,992.39 299,783,992.39 299,355,777.01 299,355,777.01 299,290,974.13 299,290,974.13 299,642,320.20 299,642,320.20 300,078,101.93 300,078,101.93
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 360,683,000 360,683,000 361,658,883.15 361,658,883.15 362,157,461.92 362,157,461.92 362,167,543.48 362,167,543.48 361,689,211.33 361,689,211.33 361,172,569.72 361,172,569.72 361,094,385.09 361,094,385.09 361,518,283.91 361,518,283.91 362,044,054.32 362,044,054.32
124 Pelat Rambu (Eng. Grade) Buah 209,000 209,000 209,565.48 209,565.48 209,854.39 209,854.39 209,860.23 209,860.23 209,583.06 209,583.06 209,283.68 209,283.68 209,238.38 209,238.38 209,484.01 209,484.01 209,788.67 209,788.67
125 Pelat Rambu (High L Grade) Buah 243,000 243,000 243,657.47 243,657.47 243,993.38 243,993.38 244,000.17 244,000.17 243,677.91 243,677.91 243,329.83 243,329.83 243,277.16 243,277.16 243,562.75 243,562.75 243,916.97 243,916.97
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
128 Pipa Drainase Baja Dia 3" M' 273,000 273,000 273,738.64 273,738.64 274,116.02 274,116.02 274,123.65 274,123.65 273,761.60 273,761.60 273,370.55 273,370.55 273,311.38 273,311.38 273,632.22 273,632.22 274,030.18 274,030.18
129 Pipa Galvanis Dia 1,5" M' 109,000 109,000 109,294.92 109,294.92 109,445.59 109,445.59 109,448.64 109,448.64 109,304.08 109,304.08 109,147.95 109,147.95 109,124.32 109,124.32 109,252.43 109,252.43 109,411.32 109,411.32
130 Pipa Galvanis Dia 2" M' 313,000 313,000 313,846.87 313,846.87 314,279.54 314,279.54 314,288.28 314,288.28 313,873.19 313,873.19 313,424.85 313,424.85 313,357.00 313,357.00 313,724.86 313,724.86 314,181.12 314,181.12
131 Pipa Galvanis Dia 3" M' 240,000 240,000 240,649.36 240,649.36 240,981.11 240,981.11 240,987.82 240,987.82 240,669.54 240,669.54 240,325.76 240,325.76 240,273.74 240,273.74 240,555.80 240,555.80 240,905.65 240,905.65
132 Pipa Porus M' 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
133 Pipa PVC Dia 4" M' 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
134 Plastik Filter M2 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
135 Rel Pengaman M' 169,000 169,000 169,457.26 169,457.26 169,690.87 169,690.87 169,695.59 169,695.59 169,471.47 169,471.47 169,229.39 169,229.39 169,192.76 169,192.76 169,391.38 169,391.38 169,637.73 169,637.73
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,041,000 2,041,000 2,046,522.24 2,046,522.24 2,049,343.55 2,049,343.55 2,049,400.60 2,049,400.60 2,046,693.86 2,046,693.86 2,043,770.33 2,043,770.33 2,043,327.91 2,043,327.91 2,045,726.63 2,045,726.63 2,048,701.81 2,048,701.81
137 Strip Bearing Buah 313,000 313,000 313,846.87 313,846.87 314,279.54 314,279.54 314,288.28 314,288.28 313,873.19 313,873.19 313,424.85 313,424.85 313,357.00 313,357.00 313,724.86 313,724.86 314,181.12 314,181.12
138 Tiang Pancang Baja Diameter 400 M' 723,000 723,000 724,956.19 724,956.19 725,955.60 725,955.60 725,975.81 725,975.81 725,016.98 725,016.98 723,981.36 723,981.36 723,824.63 723,824.63 724,674.35 724,674.35 725,728.27 725,728.27
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 884,000 884,000 886,391.80 886,391.80 887,613.77 887,613.77 887,638.48 887,638.48 886,466.13 886,466.13 885,199.89 885,199.89 885,008.27 885,008.27 886,047.20 886,047.20 887,335.82 887,335.82
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,848,000 1,848,000 1,853,000.05 1,853,000.05 1,855,554.57 1,855,554.57 1,855,606.23 1,855,606.23 1,853,155.44 1,853,155.44 1,850,508.37 1,850,508.37 1,850,107.78 1,850,107.78 1,852,279.67 1,852,279.67 1,854,973.52 1,854,973.52
HARGA SATUAN DASAR UPAH KABUPATEN LAMONGAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 119,307.99
2 Tukang OH 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 134,346.82
3 Mandor OH 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 154,398.58
4 Operator OH 319,324.52 319,324.52 319,001.79 319,001.79 318,537.75 318,537.75 318,362.67 318,362.67 318,632.32 318,632.32 319,089.72 319,089.72 319,309.82 319,309.82 318,823.04 318,823.04
5 Pembantu Operator OH 199,828.87 199,828.87 199,626.91 199,626.91 199,336.51 199,336.51 199,226.95 199,226.95 199,395.70 199,395.70 199,681.93 199,681.93 199,819.67 199,819.67 199,515.05 199,515.05
6 Sopir OH 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 149,385.64
7 Pembantu Sopir OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
8 Mekanik OH 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 179,463.28
9 Pembantu Mekanik OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
10 Kepala Tukang OH 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 149,385.64
11 Pemasak Aspal OH 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 149,385.64

HARGA SATUAN DASAR ALAT KABUPATEN LAMONGAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 469,911.67 525,178.37 469,436.75 524,647.60 468,753.87 523,884.41 468,496.23 523,596.46 468,893.05 524,039.95 469,566.15 524,792.22 469,890.04 525,154.20 469,173.70 954,421.65
2 Asphalt Distribution Unit/Jam 289,329.90 372,545.27 289,037.49 372,168.76 288,617.03 371,627.37 288,458.40 371,423.11 288,702.73 371,737.71 289,117.16 372,271.34 289,316.58 372,528.12 288,875.53 636,757.94
3 Asphalt Finisher Unit/Jam 212,507.82 1,007,177.65 212,293.05 1,006,159.73 211,984.23 1,004,696.10 211,867.72 1,004,143.88 212,047.17 1,004,994.40 212,351.57 1,006,437.08 212,498.04 1,007,131.28 212,174.10 1,200,085.31
4 Asphalt Liquid Mixer Unit/Jam 75,824.39 138,574.79 75,747.76 138,434.74 75,637.57 138,233.36 75,595.99 138,157.38 75,660.02 138,274.40 75,768.64 138,472.90 75,820.90 138,568.41 75,705.31 207,752.44
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 101,764.31 101,764.31 101,661.46 101,661.46 101,513.58 101,513.58 101,457.78 101,457.78 101,543.72 101,543.72 101,689.48 101,689.48 101,759.63 101,759.63 101,604.50 194,740.25
6 Asphalt Mixing Plant Unit/Jam 1,137,365.82 5,834,087.06 1,136,216.34 5,828,190.80 1,134,563.51 5,819,712.67 1,133,939.91 5,816,513.93 1,134,900.37 5,821,440.58 1,136,529.53 5,829,797.34 1,137,313.47 5,833,818.50 1,135,579.67 6,865,854.02
7 Asphalt Sprayer Unit/Jam 93,782.80 93,782.80 93,688.01 93,688.01 93,551.73 93,551.73 93,500.31 93,500.31 93,579.50 93,579.50 93,713.84 93,713.84 93,778.48 93,778.48 93,635.52 179,466.50
8 Asphalt Tanker Unit/Jam 438,983.30 509,111.73 438,539.64 508,597.19 437,901.71 507,857.35 437,661.02 507,578.21 438,031.72 508,008.14 438,660.52 508,737.39 438,963.09 509,088.30 438,293.91 910,074.28
9 Blending Equipment Unit/Jam 142,669.57 225,937.16 142,525.38 225,708.81 142,318.05 225,380.48 142,239.83 225,256.60 142,360.31 225,447.40 142,564.67 225,771.03 142,663.01 225,926.76 142,445.52 356,155.01
10 Bore Pile Machine Unit/Jam 393,089.59 683,836.47 392,692.31 683,145.34 392,121.07 682,151.59 391,905.55 681,776.65 392,237.50 682,354.12 392,800.56 683,333.65 393,071.50 683,804.99 392,472.27 1,042,522.22
11 Bore Pile Machine Dia 60 Unit/Jam 257,403.84 778,197.87 257,143.70 777,411.38 256,769.64 776,280.49 256,628.51 775,853.82 256,845.87 776,510.98 257,214.58 777,625.67 257,392.00 778,162.04 256,999.61 1,012,554.43
12 Bore Pile Machine Dia 80 Unit/Jam 1,017,643.11 1,017,643.11 1,016,614.62 1,016,614.62 1,015,135.77 1,015,135.77 1,014,577.81 1,014,577.81 1,015,437.17 1,015,437.17 1,016,894.85 1,016,894.85 1,017,596.26 1,017,596.26 1,016,044.96 1,947,402.49
13 Bulldozer 100-150 HP Unit/Jam 399,075.73 578,399.13 398,672.40 577,814.56 398,092.46 576,974.03 397,873.65 576,656.90 398,210.66 577,145.34 398,782.29 577,973.84 399,057.36 578,372.50 398,449.01 942,729.04
14 Cement Tanker Unit/Jam 371,140.43 478,986.78 370,765.33 478,502.69 370,225.99 477,806.62 370,022.50 477,544.00 370,335.91 477,948.48 370,867.53 478,634.58 371,123.34 478,964.73 370,557.58 817,906.13
15 Cold Milling Unit/Jam 579,657.49 1,233,114.81 579,071.66 1,231,868.55 578,229.30 1,230,076.58 577,911.48 1,229,400.48 578,400.98 1,230,441.80 579,231.28 1,232,208.11 579,630.81 1,233,058.04 578,747.18 1,761,686.83
16 Cold Recycler Unit/Jam 4,881,693.84 4,881,693.84 4,876,760.11 4,876,760.11 4,869,666.01 4,869,666.01 4,866,989.45 4,866,989.45 4,871,111.85 4,871,111.85 4,878,104.40 4,878,104.40 4,881,469.12 4,881,469.12 4,874,027.46 9,341,804.31
17 Compressor 4000-6500 L\M Unit/Jam 148,655.71 180,749.73 148,505.47 180,567.05 148,289.44 180,304.38 148,207.94 180,205.28 148,333.47 180,357.92 148,546.40 180,616.82 148,648.87 180,741.41 148,422.25 316,517.12
18 Concrete Breaker Unit/Jam 541,745.30 1,032,281.78 541,197.78 1,031,238.49 540,410.51 1,029,738.37 540,113.48 1,029,172.39 540,570.97 1,030,044.11 541,346.96 1,031,522.75 541,720.36 1,032,234.26 540,894.53 1,526,471.56
19 Concrete Mixer (350) Unit/Jam 100,766.62 100,766.62 100,664.78 100,664.78 100,518.35 100,518.35 100,463.10 100,463.10 100,548.19 100,548.19 100,692.53 100,692.53 100,761.98 100,761.98 100,608.37 192,831.03
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 114,734.27 114,734.27 114,618.31 114,618.31 114,451.58 114,451.58 114,388.67 114,388.67 114,485.56 114,485.56 114,649.91 114,649.91 114,728.99 114,728.99 114,554.09 219,560.08
21 Concrete Pan Mixer Unit/Jam 305,292.93 653,711.51 304,984.38 653,050.83 304,540.73 652,100.86 304,373.34 651,742.44 304,631.15 652,294.47 305,068.45 653,230.85 305,278.88 653,681.42 304,813.49 932,092.16
22 Concrete Pump Unit/Jam 232,461.61 249,422.57 232,226.67 249,170.49 231,888.86 248,808.03 231,761.40 248,671.28 231,957.71 248,881.90 232,290.69 249,239.18 232,450.91 249,411.09 232,096.55 461,782.15
23 Concrete Vibrator Unit/Jam 86,798.97 86,798.97 86,711.25 86,711.25 86,585.11 86,585.11 86,537.52 86,537.52 86,610.82 86,610.82 86,735.15 86,735.15 86,794.98 86,794.98 86,662.66 166,101.98
24 Crane 10-15 Ton Unit/Jam 311,279.07 311,279.07 310,964.47 310,964.47 310,512.12 310,512.12 310,341.45 310,341.45 310,604.31 310,604.31 311,050.19 311,050.19 311,264.74 311,264.74 310,790.22 595,676.06
25 Crane On Track 35 Ton Unit/Jam 258,401.53 490,863.04 258,140.38 490,366.94 257,764.87 489,653.62 257,623.19 489,384.49 257,841.40 489,799.00 258,211.53 490,502.11 258,389.64 490,840.44 257,995.73 726,583.94
26 Crane On Track 75-100 Ton Unit/Jam 406,059.55 615,553.24 405,649.17 614,931.12 405,059.08 614,036.60 404,836.44 613,699.10 405,179.34 614,218.91 405,760.98 615,100.63 406,040.86 615,524.90 405,421.86 986,216.47
27 Dump Truck 10 Ton Unit/Jam 384,110.39 412,711.88 383,722.18 412,294.77 383,163.99 411,695.01 382,953.39 411,468.73 383,277.76 411,817.25 383,827.96 412,408.42 384,092.71 412,692.88 383,507.17 763,605.55
28 Dump Truck 3-4 M3 Unit/Jam 209,514.76 212,883.01 209,303.01 212,667.86 208,998.54 212,358.50 208,883.67 212,241.78 209,060.59 212,421.55 209,360.70 212,726.48 209,505.11 212,873.21 209,185.73 404,298.77
29 Excavator 80-140 HP Unit/Jam 303,297.55 481,999.27 302,991.02 481,512.14 302,550.27 480,811.69 302,383.98 480,547.42 302,640.10 480,954.45 303,074.54 481,644.87 303,283.59 481,977.08 302,821.24 758,823.39
30 Flat Bed Truck 3-4 M3 Unit/Jam 368,147.36 492,040.92 367,775.29 491,543.64 367,240.29 490,828.60 367,038.44 490,558.82 367,349.33 490,974.33 367,876.67 491,679.13 368,130.41 492,018.27 367,569.21 828,200.49
31 Fulvi Mixer Unit/Jam 921,864.93 1,439,972.83 920,933.24 1,438,517.51 919,593.58 1,436,424.93 919,088.14 1,435,635.41 919,866.62 1,436,851.42 921,187.10 1,438,914.04 921,822.49 1,439,906.54 920,417.20 2,281,411.79
32 Generator Set Unit/Jam 410,050.31 434,803.51 409,635.89 434,364.07 409,040.00 433,732.21 408,815.18 433,493.82 409,161.45 433,860.99 409,748.81 434,483.81 410,031.43 434,783.50 409,406.35 809,402.98
33 Hot Recycler Unit/Jam 3,012,024.05 8,832,636.67 3,008,979.93 8,823,709.89 3,004,602.84 8,810,874.25 3,002,951.39 8,806,031.45 3,005,494.93 8,813,490.27 3,009,809.36 8,826,142.16 3,011,885.40 8,832,230.08 3,007,293.87 11,575,401.27
34 Jack Hammer Unit/Jam 56,868.29 95,395.69 56,810.82 95,299.28 56,728.18 95,160.65 56,697.00 95,108.34 56,745.02 95,188.90 56,826.48 95,325.55 56,865.67 95,391.30 56,778.98 147,292.33
35 Launching Gantry Unit/Jam 72,371,385.48 72,371,385.48 72,298,242.77 72,298,242.77 72,193,072.25 72,193,072.25 72,153,392.12 72,153,392.12 72,214,506.94 72,214,506.94 72,318,171.85 72,318,171.85 72,368,054.06 72,368,054.06 72,257,731.05 138,492,773.95
36 Motor Grader > 100 HP Unit/Jam 284,341.46 477,982.61 284,054.08 477,499.53 283,640.88 476,804.93 283,484.98 476,542.86 283,725.09 476,946.49 284,132.38 477,631.16 284,328.37 477,960.61 283,894.92 737,464.22
37 Pedestrian Roller Unit/Jam 93,782.80 93,782.80 93,688.01 93,688.01 93,551.73 93,551.73 93,500.31 93,500.31 93,579.50 93,579.50 93,713.84 93,713.84 93,778.48 93,778.48 93,635.52 179,466.50
38 Pile Driver + Hammer Unit/Jam 106,752.76 312,295.36 106,644.87 311,979.74 106,489.73 311,525.91 106,431.20 311,354.68 106,521.35 311,618.40 106,674.26 312,065.74 106,747.84 312,280.99 106,585.11 409,506.15
39 Rock Drill Breaker Unit/Jam 103,759.69 337,399.49 103,654.82 337,058.50 103,504.04 336,568.18 103,447.15 336,383.19 103,534.77 336,668.11 103,683.40 337,151.41 103,754.91 337,383.96 103,596.74 431,831.57
40 Split Form Paver Unit/Jam 219,491.65 219,491.65 219,269.82 219,269.82 218,950.85 218,950.85 218,830.51 218,830.51 219,015.86 219,015.86 219,330.26 219,330.26 219,481.55 219,481.55 219,146.95 420,027.99
41 Stone Crusher Unit/Jam 587,639.01 732,303.50 587,045.11 731,563.39 586,191.15 730,499.21 585,868.95 730,097.70 586,365.19 730,716.10 587,206.93 731,765.05 587,611.96 732,269.79 586,716.16 1,268,966.79
42 Tamper Unit/Jam 87,796.66 87,796.66 87,707.93 87,707.93 87,580.34 87,580.34 87,532.20 87,532.20 87,606.34 87,606.34 87,732.10 87,732.10 87,792.62 87,792.62 87,658.78 168,011.20
43 Tandem Roller 6-8 T Unit/Jam 424,017.96 495,053.42 423,589.42 494,553.09 422,973.24 493,833.68 422,740.76 493,562.24 423,098.82 493,980.30 423,706.19 494,689.41 423,998.44 495,030.63 423,352.07 882,341.61
44 Three Wheel Roller 6-8 T Unit/Jam 140,674.19 185,169.06 140,532.02 184,981.92 140,327.59 184,712.83 140,250.46 184,611.30 140,369.26 184,767.67 140,570.76 185,032.91 140,667.72 185,160.53 140,453.27 313,624.74
45 Tire Roller 8-10 T Unit/Jam 251,417.71 453,882.65 251,163.61 453,423.93 250,798.25 452,764.34 250,660.40 452,515.49 250,872.71 452,898.77 251,232.84 453,548.91 251,406.13 453,861.75 251,022.87 683,269.95
46 Track Loader 75-100 HP Unit/Jam 235,454.68 311,291.20 235,216.72 310,976.59 234,874.55 310,524.22 234,745.45 310,353.54 234,944.29 310,616.41 235,281.55 311,062.31 235,443.84 311,276.87 235,084.91 526,292.90
47 Trailer 20 Ton Unit/Jam 380,119.63 525,781.88 379,735.46 525,250.49 379,183.07 524,486.42 378,974.65 524,198.14 379,295.65 524,642.15 379,840.13 525,395.28 380,102.13 525,757.67 379,522.68 872,845.60
48 Trailler 15 Ton Unit/Jam 329,237.48 501,078.41 328,904.73 500,571.99 328,426.28 499,843.82 328,245.76 499,569.09 328,523.79 499,992.23 328,995.39 500,709.97 329,222.32 501,055.34 328,720.43 801,613.05
49 Truck Mixer (agitator) Unit/Jam 414,041.07 608,590.36 413,622.61 607,975.28 413,020.93 607,090.87 412,793.91 606,757.19 413,143.56 607,271.12 413,736.63 608,142.87 414,022.01 608,562.34 413,390.84 986,569.29
50 Vibrating Rammer Unit/Jam 84,803.59 84,803.59 84,717.88 84,717.88 84,594.65 84,594.65 84,548.15 84,548.15 84,619.76 84,619.76 84,741.24 84,741.24 84,799.69 84,799.69 84,670.41 162,283.54
51 Vibratory Roller 5-8 T Unit/Jam 204,526.31 438,820.17 204,319.60 438,376.67 204,022.39 437,738.98 203,910.25 437,498.38 204,082.96 437,868.95 204,375.93 438,497.51 204,516.90 438,799.97 204,205.12 625,315.63
52 Water Pump 70-100 MM Unit/Jam 63,852.12 63,852.12 63,787.58 63,787.58 63,694.79 63,694.79 63,659.78 63,659.78 63,713.70 63,713.70 63,805.17 63,805.17 63,849.18 63,849.18 63,751.84 122,189.96
53 Water Tanker 3000-4500 L Unit/Jam 231,463.92 231,463.92 231,229.99 231,229.99 230,893.63 230,893.63 230,766.72 230,766.72 230,962.18 230,962.18 231,293.73 231,293.73 231,453.27 231,453.27 231,100.42 442,938.61
54 Welding Set Unit/Jam 129,699.61 129,699.61 129,568.53 129,568.53 129,380.05 129,380.05 129,308.94 129,308.94 129,418.46 129,418.46 129,604.25 129,604.25 129,693.64 129,693.64 129,495.93 248,198.36
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 225,477.79 401,666.06 225,249.91 401,260.11 224,922.24 400,676.41 224,798.61 400,456.18 224,989.02 400,795.37 225,312.00 401,370.72 225,467.41 401,647.57 225,123.69 607,394.88
HARGA SATUAN DASAR BAHAN KABUPATEN LAMONGAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
2 Agregat Pecah Mesin 20-30 mm M3 361,499.45 361,499.45 361,134.10 361,134.10 360,608.77 360,608.77 360,410.56 360,410.56 360,715.84 360,715.84 361,233.65 361,233.65 361,482.81 361,482.81 360,931.74 691,779.79
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 376,561.93 376,561.93 376,181.36 376,181.36 375,634.13 375,634.13 375,427.67 375,427.67 375,745.66 375,745.66 376,285.05 376,285.05 376,544.60 376,544.60 375,970.57 720,603.95
4 Bahan Agr. Base Kelas A M3 329,366.17 329,366.17 329,033.29 329,033.29 328,554.66 328,554.66 328,374.07 328,374.07 328,652.21 328,652.21 329,123.99 329,123.99 329,351.01 329,351.01 328,848.92 630,288.26
5 Bahan Agr. Base Kelas B M3 309,282.87 309,282.87 308,970.29 308,970.29 308,520.84 308,520.84 308,351.26 308,351.26 308,612.44 308,612.44 309,055.46 309,055.46 309,268.63 309,268.63 308,797.16 591,856.05
6 Bahan Agr. Base Kelas C M3 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 543,815.78
7 Bahan Agr. Base Kelas C2 M3 259,074.61 259,074.61 258,812.77 258,812.77 258,436.28 258,436.28 258,294.24 258,294.24 258,513.02 258,513.02 258,884.12 258,884.12 259,062.68 259,062.68 258,667.75 495,775.52
8 Bahan Agr. Base Kelas S M3 209,870.52 209,870.52 209,658.41 209,658.41 209,353.42 209,353.42 209,238.36 209,238.36 209,415.58 209,415.58 209,716.20 209,716.20 209,860.86 209,860.86 209,540.93 401,616.60
9 Bahan Pilihan M3 209,870.52 209,870.52 209,658.41 209,658.41 209,353.42 209,353.42 209,238.36 209,238.36 209,415.58 209,415.58 209,716.20 209,716.20 209,860.86 209,860.86 209,540.93 401,616.60
10 Bahan Tanah Timbunan M3 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 228,671.65
11 Batu Belah/Kerakal M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
12 Batu Kali M3 349,449.47 349,449.47 349,096.30 349,096.30 348,588.48 348,588.48 348,396.88 348,396.88 348,691.98 348,691.98 349,192.53 349,192.53 349,433.39 349,433.39 348,900.69 668,720.47
13 Chipping M3 221,920.50 221,920.50 221,696.21 221,696.21 221,373.72 221,373.72 221,252.04 221,252.04 221,439.44 221,439.44 221,757.32 221,757.32 221,910.28 221,910.28 221,571.99 424,675.93
14 Chipping (kg) Kg 272.13 272.13 271.85 271.85 271.46 271.46 271.31 271.31 271.54 271.54 271.93 271.93 272.12 272.12 271.70 520.76
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 398,653.56 398,653.56 398,250.66 398,250.66 397,671.34 397,671.34 397,452.76 397,452.76 397,789.41 397,789.41 398,360.44 398,360.44 398,635.21 398,635.21 398,027.51 762,879.38
18 Kapur M3 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 190,239.44
19 Pasir Beton (Kasar) M3 473,965.95 473,965.95 473,486.93 473,486.93 472,798.16 472,798.16 472,538.30 472,538.30 472,938.54 472,938.54 473,617.45 473,617.45 473,944.13 473,944.13 473,221.62 907,000.18
20 Pasir Halus (untuk HRS) M3 229,953.82 229,953.82 229,721.41 229,721.41 229,387.24 229,387.24 229,261.16 229,261.16 229,455.35 229,455.35 229,784.74 229,784.74 229,943.23 229,943.23 229,592.69 440,048.81
21 Pasir Pasang (Sedang) M3 335,391.16 335,391.16 335,052.19 335,052.19 334,564.80 334,564.80 334,380.91 334,380.91 334,664.14 334,664.14 335,144.55 335,144.55 335,375.72 335,375.72 334,864.45 641,817.92
22 Pasir Urug M3 203,845.53 203,845.53 203,639.51 203,639.51 203,343.28 203,343.28 203,231.51 203,231.51 203,403.65 203,403.65 203,695.64 203,695.64 203,836.14 203,836.14 203,525.40 390,086.94
23 Pasir Urug (ada unsur lempung) M3 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
24 Sirtu M3 251,041.29 251,041.29 250,787.57 250,787.57 250,422.76 250,422.76 250,285.11 250,285.11 250,497.11 250,497.11 250,856.70 250,856.70 251,029.73 251,029.73 250,647.04 480,402.64
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
26 Anti Pengelupas Liter 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89 100,258.82 192,161.05
27 Arbocell Kg 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
37 Assetilline Botol 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43 155,401.17 297,849.63
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 588,636.70 588,636.70 588,041.79 588,041.79 587,186.38 587,186.38 586,863.64 586,863.64 587,360.72 587,360.72 588,203.88 588,203.88 588,609.60 588,609.60 587,712.28 1,126,438.70
41 Beton K-125 (fc' 10 MPa) M3 608,590.48 608,590.48 607,975.41 607,975.41 607,091.00 607,091.00 606,757.32 606,757.32 607,271.25 607,271.25 608,143.00 608,143.00 608,562.47 608,562.47 607,634.73 1,164,623.06
42 Beton K-175 (fc' 15 MPa) M3 658,474.95 658,474.95 657,809.46 657,809.46 656,852.56 656,852.56 656,491.53 656,491.53 657,047.58 657,047.58 657,990.78 657,990.78 658,444.64 658,444.64 657,440.86 1,260,083.97
43 Beton K-250 (fc' 20 MPa) M3 733,301.65 733,301.65 732,560.53 732,560.53 731,494.89 731,494.89 731,092.84 731,092.84 731,712.08 731,712.08 732,762.46 732,762.46 733,267.89 733,267.89 732,150.05 1,403,275.33
44 Beton K-300 (fc' 25 MPa) M3 763,232.33 763,232.33 762,460.96 762,460.96 761,351.83 761,351.83 760,933.36 760,933.36 761,577.88 761,577.88 762,671.14 762,671.14 763,197.20 763,197.20 762,033.72 1,460,551.87
45 Beton K-350 (fc' 30 MPa) M3 793,163.01 793,163.01 792,361.39 792,361.39 791,208.76 791,208.76 790,773.88 790,773.88 791,443.68 791,443.68 792,579.81 792,579.81 793,126.50 793,126.50 791,917.40 1,517,828.41
46 Beton K-400 (fc' 35 MPa) M3 823,093.69 823,093.69 822,261.82 822,261.82 821,065.70 821,065.70 820,614.41 820,614.41 821,309.48 821,309.48 822,488.48 822,488.48 823,055.80 823,055.80 821,801.07 1,575,104.96
47 Beton K-450 (fc' 40 MPa) M3 863,001.26 863,001.26 862,129.06 862,129.06 860,874.94 860,874.94 860,401.77 860,401.77 861,130.54 861,130.54 862,366.71 862,366.71 862,961.53 862,961.53 861,645.97 1,651,473.68
48 Beton K-500 (fc' 45 MPa) M3 897,920.39 897,920.39 897,012.90 897,012.90 895,708.03 895,708.03 895,215.72 895,215.72 895,973.98 895,973.98 897,260.16 897,260.16 897,879.05 897,879.05 896,510.26 1,718,296.32
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
51 Cat Anti Karat Kg 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
52 Cat Marka (Non Thermoplas) Kg 64,849.81 64,849.81 64,784.26 64,784.26 64,690.02 64,690.02 64,654.47 64,654.47 64,709.23 64,709.23 64,802.12 64,802.12 64,846.82 64,846.82 64,747.96 124,099.18
53 Cat Marka (Thermoplastic) Kg 61,254.07 61,254.07 61,192.17 61,192.17 61,103.15 61,103.15 61,069.57 61,069.57 61,121.29 61,121.29 61,209.03 61,209.03 61,251.25 61,251.25 61,157.88 117,218.24
54 Cerucuk Diameter 10-15 cm M' 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,302,402.20 1,302,402.20 1,301,085.92 1,301,085.92 1,299,193.26 1,299,193.26 1,298,479.17 1,298,479.17 1,299,579.00 1,299,579.00 1,301,444.56 1,301,444.56 1,302,342.25 1,302,342.25 1,300,356.86 2,492,328.87
57 Curing Compound Liter 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 608,524.08 608,524.08 607,909.07 607,909.07 607,024.76 607,024.76 606,691.12 606,691.12 607,204.99 607,204.99 608,076.64 608,076.64 608,496.07 608,496.07 607,568.43 1,164,495.99
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 707,936.43 707,936.43 707,220.95 707,220.95 706,192.17 706,192.17 705,804.02 705,804.02 706,401.85 706,401.85 707,415.90 707,415.90 707,903.84 707,903.84 706,824.66 1,354,735.43
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 897,723.64 897,723.64 896,816.35 896,816.35 895,511.78 895,511.78 895,019.57 895,019.57 895,777.66 895,777.66 897,063.56 897,063.56 897,682.32 897,682.32 896,313.83 1,717,919.82
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
64 Oxygen (Isi 6 M3) Botol 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,376,710.42 1,376,710.42 1,375,319.04 1,375,319.04 1,373,318.39 1,373,318.39 1,372,563.57 1,372,563.57 1,373,726.14 1,373,726.14 1,375,698.15 1,375,698.15 1,376,647.05 1,376,647.05 1,374,548.39 2,634,528.05
67 Seal Coat M2 109,454.00 109,454.00 109,343.38 109,343.38 109,184.32 109,184.32 109,124.31 109,124.31 109,216.74 109,216.74 109,373.52 109,373.52 109,448.96 109,448.96 109,282.11 209,455.55
68 Seal Guard Kg 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
69 Semen/PC (50 kg) Zak 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
81 Baja Tulangan (Ulir) D19 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,969,797.09 12,969,797.09 12,956,689.06 12,956,689.06 12,937,841.28 12,937,841.28 12,930,730.13 12,930,730.13 12,941,682.62 12,941,682.62 12,960,260.58 12,960,260.58 12,969,200.06 12,969,200.06 12,949,428.89 24,819,521.75
87 Box Culvert Type DUB 200×200 M' 13,768,108.38 13,768,108.38 13,754,193.53 13,754,193.53 13,734,185.64 13,734,185.64 13,726,636.80 13,726,636.80 13,738,263.43 13,738,263.43 13,757,984.89 13,757,984.89 13,767,474.60 13,767,474.60 13,746,486.49 26,347,202.13
88 Box Culvert Type uk 300×200 M' 14,865,660.89 14,865,660.89 14,850,636.79 14,850,636.79 14,829,033.93 14,829,033.93 14,820,883.31 14,820,883.31 14,833,436.79 14,833,436.79 14,854,730.39 14,854,730.39 14,864,976.59 14,864,976.59 14,842,315.36 28,447,522.45
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 192,799.71 192,799.71 192,604.85 192,604.85 192,324.68 192,324.68 192,218.97 192,218.97 192,381.78 192,381.78 192,657.95 192,657.95 192,790.83 192,790.83 192,496.93 368,949.22
91 Ducting (Strand Prestress) M' 168,699.75 168,699.75 168,529.25 168,529.25 168,284.09 168,284.09 168,191.60 168,191.60 168,334.06 168,334.06 168,575.70 168,575.70 168,691.98 168,691.98 168,434.81 322,830.57
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,171,005.06 2,171,005.06 2,168,810.91 2,168,810.91 2,165,656.00 2,165,656.00 2,164,465.67 2,164,465.67 2,166,299.00 2,166,299.00 2,169,408.75 2,169,408.75 2,170,905.12 2,170,905.12 2,167,595.64 4,154,521.99
94 Expansion Join Tipe Rubber M' 1,571,518.46 1,571,518.46 1,569,930.19 1,569,930.19 1,567,646.45 1,567,646.45 1,566,784.81 1,566,784.81 1,568,111.90 1,568,111.90 1,570,362.95 1,570,362.95 1,571,446.12 1,571,446.12 1,569,050.50 3,007,320.50
95 Expansion Join Tipe Torma M' 1,802,476.45 1,802,476.45 1,800,654.76 1,800,654.76 1,798,035.39 1,798,035.39 1,797,047.12 1,797,047.12 1,798,569.24 1,798,569.24 1,801,151.11 1,801,151.11 1,802,393.47 1,802,393.47 1,799,645.78 3,449,290.92
96 Expansion Tipe Joint Asphaltic Plug M' 2,138,871.77 2,138,871.77 2,136,710.10 2,136,710.10 2,133,601.88 2,133,601.88 2,132,429.17 2,132,429.17 2,134,235.37 2,134,235.37 2,137,299.09 2,137,299.09 2,138,773.31 2,138,773.31 2,135,512.82 4,093,030.45
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
99 Glass Bead Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
100 Joint Sealent Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
101 Joint Socket Pile 16×16×16 Set 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
102 Joint Socket Pile 35×35 Set 780,236.32 780,236.32 779,447.77 779,447.77 778,313.93 778,313.93 777,886.13 777,886.13 778,545.01 778,545.01 779,662.63 779,662.63 780,200.41 780,200.41 779,011.01 1,493,091.39
103 Kawat Beton Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
104 Kawat Bronjong Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
105 Kawat Las Dos 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 343,968.29
106 Kayu Acuan (Kelas III/Meranti) M3 4,289,793.52 4,289,793.52 4,285,458.01 4,285,458.01 4,279,224.06 4,279,224.06 4,276,872.03 4,276,872.03 4,280,494.59 4,280,494.59 4,286,639.30 4,286,639.30 4,289,596.05 4,289,596.05 4,283,056.69 8,209,120.23
107 Kayu Perancah (Gelam) M3 2,763,462.50 2,763,462.50 2,760,669.58 2,760,669.58 2,756,653.70 2,756,653.70 2,755,138.54 2,755,138.54 2,757,472.17 2,757,472.17 2,761,430.56 2,761,430.56 2,763,335.29 2,763,335.29 2,759,122.66 5,288,272.21
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,229.08 55,229.08 55,173.27 55,173.27 55,093.01 55,093.01 55,062.73 55,062.73 55,109.36 55,109.36 55,188.47 55,188.47 55,226.54 55,226.54 55,142.35 105,688.58
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
110 Marmer Nama Jembatan Buah 598,482.43 598,482.43 597,877.57 597,877.57 597,007.85 597,007.85 596,679.71 596,679.71 597,185.11 597,185.11 598,042.37 598,042.37 598,454.88 598,454.88 597,542.55 1,145,279.88
111 Mata Kucing Buah 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55 156,403.76 299,771.24
112 Matras Concrete (Tebal=10 cm) M2 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
113 Mini Pile 16×16×16 M' 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 259,417.42
114 Mini Timber Pile Buah 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
115 Multipleks 12 mm Lbr 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
116 Paku Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
117 Paving Block (Model Bata 8 cm) M2 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,325,108.21 66,325,108.21 66,258,076.21 66,258,076.21 66,161,692.18 66,161,692.18 66,125,327.13 66,125,327.13 66,181,336.10 66,181,336.10 66,276,340.32 66,276,340.32 66,322,055.11 66,322,055.11 66,220,949.05 126,922,376.26
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 93,959,733.16 93,959,733.16 93,864,772.01 93,864,772.01 93,728,229.18 93,728,229.18 93,676,712.49 93,676,712.49 93,756,057.82 93,756,057.82 93,890,645.93 93,890,645.93 93,955,407.97 93,955,407.97 93,812,175.67 179,805,098.35
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 179,583,891.40 179,583,891.40 179,402,393.51 179,402,393.51 179,141,421.17 179,141,421.17 179,042,958.05 179,042,958.05 179,194,609.65 179,194,609.65 179,451,845.97 179,451,845.97 179,575,624.73 179,575,624.73 179,301,866.89 343,658,907.60
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 235,495,807.00 235,495,807.00 235,257,801.28 235,257,801.28 234,915,577.43 234,915,577.43 234,786,458.65 234,786,458.65 234,985,325.69 234,985,325.69 235,322,650.34 235,322,650.34 235,484,966.57 235,484,966.57 235,125,976.55 450,654,182.55
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 300,195,171.83 300,195,171.83 299,891,777.19 299,891,777.19 299,455,531.84 299,455,531.84 299,290,939.38 299,290,939.38 299,544,442.51 299,544,442.51 299,974,442.67 299,974,442.67 300,181,353.13 300,181,353.13 299,723,735.35 574,465,471.34
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 362,185,299.09 362,185,299.09 361,819,253.62 361,819,253.62 361,292,923.87 361,292,923.87 361,094,343.17 361,094,343.17 361,400,194.55 361,400,194.55 361,918,989.48 361,918,989.48 362,168,626.83 362,168,626.83 361,616,511.25 693,092,254.89
124 Pelat Rambu (Eng. Grade) Buah 209,870.52 209,870.52 209,658.41 209,658.41 209,353.42 209,353.42 209,238.36 209,238.36 209,415.58 209,415.58 209,716.20 209,716.20 209,860.86 209,860.86 209,540.93 401,616.60
125 Pelat Rambu (High L Grade) Buah 244,012.13 244,012.13 243,765.52 243,765.52 243,410.92 243,410.92 243,277.13 243,277.13 243,483.19 243,483.19 243,832.71 243,832.71 244,000.90 244,000.90 243,628.93 466,951.36
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
128 Pipa Drainase Baja Dia 3" M' 274,137.09 274,137.09 273,860.03 273,860.03 273,461.65 273,461.65 273,311.34 273,311.34 273,542.84 273,542.84 273,935.52 273,935.52 274,124.47 274,124.47 273,706.57 524,599.68
129 Pipa Galvanis Dia 1,5" M' 109,454.00 109,454.00 109,343.38 109,343.38 109,184.32 109,184.32 109,124.31 109,124.31 109,216.74 109,216.74 109,373.52 109,373.52 109,448.96 109,448.96 109,282.11 209,455.55
130 Pipa Galvanis Dia 2" M' 314,303.69 314,303.69 313,986.04 313,986.04 313,529.29 313,529.29 313,356.96 313,356.96 313,622.38 313,622.38 314,072.59 314,072.59 314,289.22 314,289.22 313,810.10 601,464.10
131 Pipa Galvanis Dia 3" M' 240,999.64 240,999.64 240,756.07 240,756.07 240,405.85 240,405.85 240,273.71 240,273.71 240,477.22 240,477.22 240,822.43 240,822.43 240,988.54 240,988.54 240,621.16 461,186.53
132 Pipa Porus M' 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
133 Pipa PVC Dia 4" M' 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
134 Plastik Filter M2 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
135 Rel Pengaman M' 169,703.91 169,703.91 169,532.40 169,532.40 169,285.78 169,285.78 169,192.74 169,192.74 169,336.05 169,336.05 169,579.13 169,579.13 169,696.10 169,696.10 169,437.40 324,752.18
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,049,501.07 2,049,501.07 2,047,429.73 2,047,429.73 2,044,451.38 2,044,451.38 2,043,327.67 2,043,327.67 2,045,058.39 2,045,058.39 2,047,994.10 2,047,994.10 2,049,406.73 2,049,406.73 2,046,282.47 3,922,007.11
137 Strip Bearing Buah 314,303.69 314,303.69 313,986.04 313,986.04 313,529.29 313,529.29 313,356.96 313,356.96 313,622.38 313,622.38 314,072.59 314,072.59 314,289.22 314,289.22 313,810.10 601,464.10
138 Tiang Pancang Baja Diameter 400 M' 726,011.40 726,011.40 725,277.65 725,277.65 724,222.61 724,222.61 723,824.55 723,824.55 724,437.64 724,437.64 725,477.58 725,477.58 725,977.98 725,977.98 724,871.25 1,389,324.42
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 887,681.99 887,681.99 886,784.85 886,784.85 885,494.87 885,494.87 885,008.16 885,008.16 885,757.78 885,757.78 887,029.29 887,029.29 887,641.13 887,641.13 886,287.95 1,698,703.72
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,855,697.20 1,855,697.20 1,853,821.72 1,853,821.72 1,851,125.01 1,851,125.01 1,850,107.56 1,850,107.56 1,851,674.63 1,851,674.63 1,854,332.73 1,854,332.73 1,855,611.78 1,855,611.78 1,852,782.95 3,551,136.28
HARGA SATUAN DASAR UPAH KABUPATEN JOMBANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
2 Tukang OH 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
3 Mandor OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
4 Operator OH 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
5 Pembantu Operator OH 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
6 Sopir OH 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
7 Pembantu Sopir OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
8 Mekanik OH 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
9 Pembantu Mekanik OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
10 Kepala Tukang OH 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
11 Pemasak Aspal OH 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84

HARGA SATUAN DASAR ALAT KABUPATEN JOMBANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 444,772 497,000 445,975.12 498,344.71 446,589.94 499,031.72 446,602.37 499,045.61 446,012.52 498,386.50 445,375.43 497,674.60 445,279.02 497,566.86 445,801.75 498,150.97 446,450.09 498,875.45
2 Asphalt Distribution Unit/Jam 273,851 352,000 274,591.90 352,952.39 274,970.45 353,438.97 274,978.11 353,448.80 274,614.93 352,981.99 274,222.67 352,477.78 274,163.30 352,401.48 274,485.15 352,815.18 274,884.35 353,328.29
3 Asphalt Finisher Unit/Jam 201,139 954,000 201,683.02 956,581.19 201,961.06 957,899.93 201,966.68 957,926.59 201,699.93 956,661.41 201,411.82 955,294.90 201,368.22 955,088.11 201,604.61 956,209.31 201,897.81 957,599.96
4 Asphalt Liquid Mixer Unit/Jam 71,768 131,000 71,962.02 131,354.44 72,061.22 131,535.52 72,063.23 131,539.19 71,968.05 131,365.46 71,865.25 131,177.81 71,849.69 131,149.41 71,934.04 131,303.37 72,038.66 131,494.33
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 96,320 96,320 96,580.60 96,580.60 96,713.75 96,713.75 96,716.44 96,716.44 96,588.70 96,588.70 96,450.73 96,450.73 96,429.85 96,429.85 96,543.05 96,543.05 96,683.46 96,683.46
6 Asphalt Mixing Plant Unit/Jam 1,076,518 5,521,968 1,079,430.24 5,536,908.06 1,080,918.33 5,544,541.17 1,080,948.42 5,544,695.52 1,079,520.76 5,537,372.37 1,077,978.76 5,529,462.72 1,077,745.40 5,528,265.73 1,079,010.60 5,534,755.52 1,080,579.85 5,542,804.93
7 Asphalt Sprayer Unit/Jam 88,765 88,765 89,005.65 89,005.65 89,128.35 89,128.35 89,130.83 89,130.83 89,013.12 89,013.12 88,885.97 88,885.97 88,866.73 88,866.73 88,971.05 88,971.05 89,100.44 89,100.44
8 Asphalt Tanker Unit/Jam 415,498 482,000 416,622.20 483,304.12 417,196.55 483,970.40 417,208.16 483,983.87 416,657.13 483,344.65 416,061.98 482,654.24 415,971.91 482,549.76 416,460.23 483,116.23 417,065.91 483,818.85
9 Blending Equipment Unit/Jam 135,037 213,000 135,402.21 213,576.30 135,588.88 213,870.74 135,592.65 213,876.69 135,413.57 213,594.21 135,220.14 213,289.11 135,190.87 213,242.94 135,349.57 213,493.27 135,546.42 213,803.77
10 Bore Pile Machine Unit/Jam 372,060 647,000 373,066.24 648,750.56 373,580.55 649,644.92 373,590.94 649,663.00 373,097.53 648,804.96 372,564.59 647,878.20 372,483.94 647,737.95 372,921.21 648,498.35 373,463.56 649,441.49
11 Bore Pile Machine Dia 60 Unit/Jam 243,633 737,000 244,292.11 738,994.07 244,628.88 740,012.84 244,635.69 740,033.44 244,312.59 739,056.04 243,963.61 738,000.36 243,910.80 737,840.60 244,197.14 738,706.77 244,552.28 739,781.10
12 Bore Pile Machine Dia 80 Unit/Jam 963,200 963,200 965,806.00 965,806.00 967,137.45 967,137.45 967,164.37 967,164.37 965,886.99 965,886.99 964,507.31 964,507.31 964,298.52 964,298.52 965,430.53 965,430.53 966,834.60 966,834.60
13 Bulldozer 100-150 HP Unit/Jam 377,725 377,725 378,747.45 378,747.45 379,269.59 379,269.59 379,280.15 379,280.15 378,779.21 378,779.21 378,238.16 378,238.16 378,156.28 378,156.28 378,600.21 378,600.21 379,150.82 379,150.82
14 Cement Tanker Unit/Jam 351,285 453,000 352,235.13 454,225.66 352,720.72 454,851.85 352,730.54 454,864.51 352,264.67 454,263.75 351,761.49 453,614.88 351,685.34 453,516.68 352,098.19 454,049.08 352,610.27 454,709.42
15 Cold Milling Unit/Jam 548,646 1,167,000 550,130.67 1,170,157.50 550,889.08 1,171,770.66 550,904.41 1,171,803.28 550,176.81 1,170,255.63 549,390.93 1,168,584.02 549,272.00 1,168,331.05 549,916.80 1,169,702.58 550,716.57 1,171,403.73
16 Cold Recycler Unit/Jam 4,620,527 4,620,527 4,633,028.21 4,633,028.21 4,639,415.25 4,639,415.25 4,639,544.40 4,639,544.40 4,633,416.73 4,633,416.73 4,626,798.29 4,626,798.29 4,625,796.71 4,625,796.71 4,631,227.06 4,631,227.06 4,637,962.44 4,637,962.44
17 Compressor 4000-6500 L\M Unit/Jam 140,703 140,703 141,083.43 141,083.43 141,277.92 141,277.92 141,281.85 141,281.85 141,095.26 141,095.26 140,893.71 140,893.71 140,863.21 140,863.21 141,028.58 141,028.58 141,233.68 141,233.68
18 Concrete Breaker Unit/Jam 512,762 977,000 514,149.67 979,643.42 514,858.47 980,993.95 514,872.80 981,021.26 514,192.78 979,725.57 513,458.30 978,326.12 513,347.15 978,114.34 513,949.78 979,262.58 514,697.24 980,686.76
19 Concrete Mixer (350) Unit/Jam 95,376 95,376 95,633.73 95,633.73 95,765.57 95,765.57 95,768.24 95,768.24 95,641.75 95,641.75 95,505.14 95,505.14 95,484.46 95,484.46 95,596.55 95,596.55 95,735.58 95,735.58
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 108,596 108,596 108,889.89 108,889.89 109,040.01 109,040.01 109,043.04 109,043.04 108,899.02 108,899.02 108,743.47 108,743.47 108,719.93 108,719.93 108,847.56 108,847.56 109,005.86 109,005.86
21 Concrete Pan Mixer Unit/Jam 288,960 619,000 289,741.80 620,674.80 290,141.24 621,530.45 290,149.31 621,547.76 289,766.10 620,726.85 289,352.19 619,840.19 289,289.56 619,706.01 289,629.16 620,433.50 290,050.38 621,335.83
22 Concrete Pump Unit/Jam 220,025 236,000 220,620.39 236,638.53 220,924.54 236,964.76 220,930.69 236,971.36 220,638.89 236,658.38 220,323.73 236,320.33 220,276.03 236,269.18 220,534.62 236,546.54 220,855.35 236,890.56
23 Concrete Vibrator Unit/Jam 82,155 82,155 82,377.57 82,377.57 82,491.14 82,491.14 82,493.43 82,493.43 82,384.48 82,384.48 82,266.80 82,266.80 82,248.99 82,248.99 82,345.55 82,345.55 82,465.30 82,465.30
24 Crane 10-15 Ton Unit/Jam 294,626 294,626 295,423.01 295,423.01 295,830.28 295,830.28 295,838.51 295,838.51 295,447.79 295,447.79 295,025.76 295,025.76 294,961.90 294,961.90 295,308.16 295,308.16 295,737.64 295,737.64
25 Crane On Track 35 Ton Unit/Jam 244,577 465,000 245,238.98 466,258.13 245,577.06 466,900.91 245,583.90 466,913.90 245,259.54 466,297.23 244,909.21 465,631.16 244,856.19 465,530.37 245,143.64 466,076.87 245,500.16 466,754.70
26 Crane On Track 75-100 Ton Unit/Jam 384,336 583,000 385,375.53 584,577.40 385,906.81 585,383.29 385,917.55 585,399.58 385,407.85 584,626.42 384,857.33 583,791.33 384,774.02 583,664.95 385,225.71 584,350.13 385,785.96 585,199.98
27 Dump Truck 10 Ton Unit/Jam 363,561 363,561 364,544.42 364,544.42 365,046.98 365,046.98 365,057.14 365,057.14 364,574.99 364,574.99 364,054.23 364,054.23 363,975.42 363,975.42 364,402.70 364,402.70 364,932.67 364,932.67
28 Dump Truck 3-4 M3 Unit/Jam 198,306 260,000 198,842.41 260,703.47 199,116.53 261,062.87 199,122.08 261,070.14 198,859.09 260,725.33 198,575.03 260,352.91 198,532.05 260,296.55 198,765.11 260,602.12 199,054.18 260,981.12
29 Excavator 80-140 HP Unit/Jam 287,071 456,000 287,848.06 457,233.78 288,244.89 457,864.12 288,252.91 457,876.86 287,872.20 457,272.12 287,461.00 456,618.95 287,398.77 456,520.10 287,736.16 457,056.02 288,154.63 457,720.74
30 Flat Bed Truck 3-4 M3 Unit/Jam 348,452 466,000 349,394.52 467,260.83 349,876.20 467,904.99 349,885.94 467,918.02 349,423.82 467,300.02 348,924.70 466,632.52 348,849.17 466,531.51 349,258.69 467,079.18 349,766.63 467,758.47
31 Fulvi Mixer Unit/Jam 872,546 1,363,000 874,906.61 1,366,687.81 876,112.75 1,368,571.91 876,137.14 1,368,610.00 874,979.98 1,366,802.41 873,730.15 1,364,850.06 873,541.01 1,364,554.60 874,566.48 1,366,156.49 875,838.40 1,368,143.34
32 Generator Set Unit/Jam 388,113 412,000 389,163.01 413,114.73 389,699.50 413,684.24 389,710.35 413,695.76 389,195.64 413,149.37 388,639.71 412,559.22 388,555.58 412,469.92 389,011.72 412,954.13 389,577.47 413,554.70
33 Hot Recycler Unit/Jam 2,850,883 8,360,000 2,858,596.40 8,382,619.26 2,862,537.22 8,394,175.44 2,862,616.91 8,394,409.12 2,858,836.11 8,383,322.22 2,854,752.51 8,371,347.37 2,854,134.53 8,369,535.19 2,857,485.08 8,379,360.42 2,861,640.84 8,391,546.85
34 Jack Hammer Unit/Jam 53,826 53,826 53,971.51 53,971.51 54,045.92 54,045.92 54,047.42 54,047.42 53,976.04 53,976.04 53,898.94 53,898.94 53,887.27 53,887.27 53,950.53 53,950.53 54,028.99 54,028.99
35 Launching Gantry Unit/Jam 68,499,568 68,499,568 68,684,903.59 68,684,903.59 68,779,591.81 68,779,591.81 68,781,506.46 68,781,506.46 68,690,663.41 68,690,663.41 68,592,544.76 68,592,544.76 68,577,696.23 68,577,696.23 68,658,201.51 68,658,201.51 68,758,053.86 68,758,053.86
36 Motor Grader > 100 HP Unit/Jam 269,129 279,000 269,857.56 279,754.88 270,229.58 280,140.54 270,237.10 280,148.34 269,880.19 279,778.34 269,494.69 279,378.70 269,436.35 279,318.22 269,752.65 279,646.12 270,144.96 280,052.82
37 Pedestrian Roller Unit/Jam 88,765 88,765 89,005.65 89,005.65 89,128.35 89,128.35 89,130.83 89,130.83 89,013.12 89,013.12 88,885.97 88,885.97 88,866.73 88,866.73 88,971.05 88,971.05 89,100.44 89,100.44
38 Pile Driver + Hammer Unit/Jam 101,042 296,000 101,314.94 296,800.87 101,454.62 297,210.04 101,457.44 297,218.31 101,323.44 296,825.76 101,178.71 296,401.77 101,156.81 296,337.61 101,275.56 296,685.49 101,422.85 297,116.97
39 Rock Drill Breaker Unit/Jam 98,209 319,000 98,474.34 319,863.10 98,610.09 320,304.06 98,612.84 320,312.98 98,482.60 319,889.93 98,341.92 319,432.99 98,320.63 319,363.84 98,436.05 319,738.75 98,579.21 320,203.76
40 Split Form Paver Unit/Jam 207,749 207,749 208,311.10 208,311.10 208,598.27 208,598.27 208,604.08 208,604.08 208,328.57 208,328.57 208,030.99 208,030.99 207,985.95 207,985.95 208,230.12 208,230.12 208,532.95 208,532.95
41 Stone Crusher Unit/Jam 556,201 693,000 557,705.62 694,875.02 558,474.47 695,832.96 558,490.02 695,852.33 557,752.39 694,933.29 556,955.69 693,940.64 556,835.12 693,790.42 557,488.81 694,604.88 558,299.59 695,615.07
42 Tamper Unit/Jam 83,100 83,100 83,324.44 83,324.44 83,439.31 83,439.31 83,441.63 83,441.63 83,331.43 83,331.43 83,212.40 83,212.40 83,194.38 83,194.38 83,292.05 83,292.05 83,413.18 83,413.18
43 Tandem Roller 6-8 T Unit/Jam 401,333 468,000 402,419.17 469,266.25 402,973.94 469,913.17 402,985.16 469,926.25 402,452.91 469,305.60 401,878.05 468,635.24 401,791.05 468,533.79 402,262.72 469,083.81 402,847.75 469,766.02
44 Three Wheel Roller 6-8 T Unit/Jam 133,148 168,000 133,508.48 168,454.55 133,692.53 168,686.78 133,696.25 168,691.48 133,519.67 168,468.68 133,328.95 168,228.03 133,300.09 168,191.62 133,456.57 168,389.06 133,650.67 168,633.96
45 Tire Roller 8-10 T Unit/Jam 237,967 430,000 238,610.89 431,163.43 238,939.84 431,757.83 238,946.49 431,769.85 238,630.90 431,199.59 238,290.04 430,583.66 238,238.46 430,490.45 238,518.13 430,995.81 238,865.02 431,622.63
46 Track Loader 75-100 HP Unit/Jam 222,858 294,000 223,461.00 294,795.46 223,769.06 295,201.86 223,775.29 295,210.08 223,479.74 294,820.18 223,160.51 294,399.06 223,112.21 294,335.33 223,374.12 294,680.86 223,698.99 295,109.42
47 Trailer 20 Ton Unit/Jam 359,783 498,000 360,756.95 499,347.42 361,254.28 500,035.81 361,264.34 500,049.73 360,787.20 499,389.29 360,271.85 498,675.96 360,193.86 498,568.01 360,616.70 499,153.29 361,141.16 499,879.23
48 Trailler 15 Ton Unit/Jam 311,624 474,000 312,466.65 475,282.48 312,897.41 475,937.70 312,906.12 475,950.95 312,492.85 475,322.34 312,046.48 474,643.38 311,978.93 474,540.63 312,345.17 475,097.71 312,799.43 475,788.66
49 Truck Mixer (agitator) Unit/Jam 391,890 576,000 392,950.48 577,558.46 393,492.20 578,354.67 393,503.15 578,370.77 392,983.43 577,606.89 392,422.09 576,781.83 392,337.14 576,656.97 392,797.72 577,333.92 393,368.98 578,173.56
50 Vibrating Rammer Unit/Jam 80,267 80,267 80,483.83 80,483.83 80,594.79 80,594.79 80,597.03 80,597.03 80,490.58 80,490.58 80,375.61 80,375.61 80,358.21 80,358.21 80,452.54 80,452.54 80,569.55 80,569.55
51 Vibratory Roller 5-8 T Unit/Jam 193,584 236,000 194,108.07 236,638.53 194,375.66 236,964.76 194,381.08 236,971.36 194,124.35 236,658.38 193,847.06 236,320.33 193,805.09 236,269.18 194,032.61 236,546.54 194,314.80 236,890.56
52 Water Pump 70-100 MM Unit/Jam 60,436 60,436 60,599.59 60,599.59 60,683.13 60,683.13 60,684.82 60,684.82 60,604.67 60,604.67 60,518.11 60,518.11 60,505.01 60,505.01 60,576.03 60,576.03 60,664.13 60,664.13
53 Water Tanker 3000-4500 L Unit/Jam 219,081 219,081 219,673.52 219,673.52 219,976.36 219,976.36 219,982.49 219,982.49 219,691.94 219,691.94 219,378.13 219,378.13 219,330.64 219,330.64 219,588.12 219,588.12 219,907.48 219,907.48
54 Welding Set Unit/Jam 122,761 122,761 123,092.92 123,092.92 123,262.62 123,262.62 123,266.05 123,266.05 123,103.24 123,103.24 122,927.40 122,927.40 122,900.79 122,900.79 123,045.07 123,045.07 123,224.02 123,224.02
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 213,415 283,000 213,992.31 283,765.70 214,287.32 284,156.90 214,293.28 284,164.81 214,010.26 283,789.50 213,704.56 283,384.13 213,658.30 283,322.78 213,909.12 283,655.38 214,220.21 284,067.91
HARGA SATUAN DASAR BAHAN KABUPATEN JOMBANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
2 Agregat Pecah Mesin 20-30 mm M3 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 325,000 325,000 325,879.34 325,879.34 326,328.59 326,328.59 326,337.67 326,337.67 325,906.67 325,906.67 325,441.14 325,441.14 325,370.69 325,370.69 325,752.65 325,752.65 326,226.40 326,226.40
4 Bahan Agr. Base Kelas A M3 312,000 312,000 312,844.16 312,844.16 313,275.45 313,275.45 313,284.17 313,284.17 312,870.40 312,870.40 312,423.49 312,423.49 312,355.86 312,355.86 312,722.54 312,722.54 313,177.35 313,177.35
5 Bahan Agr. Base Kelas B M3 293,000 293,000 293,792.76 293,792.76 294,197.78 294,197.78 294,205.97 294,205.97 293,817.39 293,817.39 293,397.70 293,397.70 293,334.19 293,334.19 293,678.54 293,678.54 294,105.65 294,105.65
6 Bahan Agr. Base Kelas C M3 269,000 269,000 269,727.82 269,727.82 270,099.66 270,099.66 270,107.18 270,107.18 269,750.44 269,750.44 269,365.12 269,365.12 269,306.81 269,306.81 269,622.96 269,622.96 270,015.08 270,015.08
7 Bahan Agr. Base Kelas C2 M3 246,000 246,000 246,665.59 246,665.59 247,005.64 247,005.64 247,012.52 247,012.52 246,686.28 246,686.28 246,333.91 246,333.91 246,280.58 246,280.58 246,569.70 246,569.70 246,928.29 246,928.29
8 Bahan Agr. Base Kelas S M3 199,000 199,000 199,538.43 199,538.43 199,813.51 199,813.51 199,819.07 199,819.07 199,555.16 199,555.16 199,270.11 199,270.11 199,226.97 199,226.97 199,460.85 199,460.85 199,750.94 199,750.94
9 Bahan Pilihan M3 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
10 Bahan Tanah Timbunan M3 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
11 Batu Belah/Kerakal M3 320,000 320,000 320,865.81 320,865.81 321,308.15 321,308.15 321,317.10 321,317.10 320,892.72 320,892.72 320,434.35 320,434.35 320,364.98 320,364.98 320,741.07 320,741.07 321,207.54 321,207.54
12 Batu Kali M3 353,000 353,000 353,955.10 353,955.10 354,443.05 354,443.05 354,452.92 354,452.92 353,984.78 353,984.78 353,479.14 353,479.14 353,402.62 353,402.62 353,817.49 353,817.49 354,332.06 354,332.06
13 Chipping M3 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52 210,486.33 210,486.33 210,792.44 210,792.44
14 Chipping (kg) Kg 310 310 310.84 310.84 311.27 311.27 311.28 311.28 310.86 310.86 310.42 310.42 310.35 310.35 310.72 310.72 311.17 311.17
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 377,000 377,000 378,020.03 378,020.03 378,541.17 378,541.17 378,551.70 378,551.70 378,051.73 378,051.73 377,511.72 377,511.72 377,430.00 377,430.00 377,873.07 377,873.07 378,422.63 378,422.63
18 Kapur M3 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
19 Pasir Beton (Kasar) M3 449,000 449,000 450,214.84 450,214.84 450,835.50 450,835.50 450,848.05 450,848.05 450,252.59 450,252.59 449,609.45 449,609.45 449,512.12 449,512.12 450,039.81 450,039.81 450,694.32 450,694.32
20 Pasir Halus (untuk HRS) M3 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
21 Pasir Pasang (Sedang) M3 317,000 317,000 317,857.69 317,857.69 318,295.89 318,295.89 318,304.75 318,304.75 317,884.35 317,884.35 317,430.28 317,430.28 317,361.56 317,361.56 317,734.12 317,734.12 318,196.21 318,196.21
22 Pasir Urug M3 193,000 193,000 193,522.19 193,522.19 193,788.98 193,788.98 193,794.37 193,794.37 193,538.42 193,538.42 193,261.97 193,261.97 193,220.13 193,220.13 193,446.96 193,446.96 193,728.29 193,728.29
23 Pasir Urug (ada unsur lempung) M3 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
24 Sirtu M3 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
26 Anti Pengelupas Liter 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35 95,220.00 95,220.00 95,358.49 95,358.49
27 Arbocell Kg 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 147,000 147,000 147,397.73 147,397.73 147,600.93 147,600.93 147,605.04 147,605.04 147,410.09 147,410.09 147,199.53 147,199.53 147,167.66 147,167.66 147,340.43 147,340.43 147,554.71 147,554.71
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 557,145 557,145 558,652.49 558,652.49 559,422.64 559,422.64 559,438.22 559,438.22 558,699.34 558,699.34 557,901.29 557,901.29 557,780.51 557,780.51 558,435.31 558,435.31 559,247.46 559,247.46
41 Beton K-125 (fc' 10 MPa) M3 576,031 576,031 577,589.86 577,589.86 578,386.12 578,386.12 578,402.22 578,402.22 577,638.30 577,638.30 576,813.19 576,813.19 576,688.33 576,688.33 577,365.32 577,365.32 578,205.00 578,205.00
42 Beton K-175 (fc' 15 MPa) M3 623,247 623,247 624,933.30 624,933.30 625,794.82 625,794.82 625,812.24 625,812.24 624,985.70 624,985.70 624,092.96 624,092.96 623,957.86 623,957.86 624,690.35 624,690.35 625,598.86 625,598.86
43 Beton K-250 (fc' 20 MPa) M3 694,071 694,071 695,948.44 695,948.44 696,907.87 696,907.87 696,927.27 696,927.27 696,006.80 696,006.80 695,012.62 695,012.62 694,862.17 694,862.17 695,677.89 695,677.89 696,689.64 696,689.64
44 Beton K-300 (fc' 25 MPa) M3 722,400 722,400 724,354.50 724,354.50 725,353.09 725,353.09 725,373.28 725,373.28 724,415.25 724,415.25 723,380.48 723,380.48 723,223.89 723,223.89 724,072.90 724,072.90 725,125.95 725,125.95
45 Beton K-350 (fc' 30 MPa) M3 750,729 750,729 752,760.56 752,760.56 753,798.31 753,798.31 753,819.29 753,819.29 752,823.69 752,823.69 751,748.34 751,748.34 751,585.61 751,585.61 752,467.92 752,467.92 753,562.26 753,562.26
46 Beton K-400 (fc' 35 MPa) M3 779,059 779,059 781,166.62 781,166.62 782,243.53 782,243.53 782,265.30 782,265.30 781,232.13 781,232.13 780,116.21 780,116.21 779,947.33 779,947.33 780,862.93 780,862.93 781,998.57 781,998.57
47 Beton K-450 (fc' 40 MPa) M3 816,831 816,831 819,041.37 819,041.37 820,170.49 820,170.49 820,193.32 820,193.32 819,110.05 819,110.05 817,940.02 817,940.02 817,762.96 817,762.96 818,722.95 818,722.95 819,913.65 819,913.65
48 Beton K-500 (fc' 45 MPa) M3 849,882 849,882 852,181.77 852,181.77 853,356.58 853,356.58 853,380.33 853,380.33 852,253.23 852,253.23 851,035.86 851,035.86 850,851.63 850,851.63 851,850.47 851,850.47 853,089.35 853,089.35
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 61,000 61,000 61,165.04 61,165.04 61,249.37 61,249.37 61,251.07 61,251.07 61,170.17 61,170.17 61,082.80 61,082.80 61,069.57 61,069.57 61,141.27 61,141.27 61,230.19 61,230.19
51 Cat Anti Karat Kg 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
52 Cat Marka (Non Thermoplas) Kg 52,000 52,000 52,140.69 52,140.69 52,212.57 52,212.57 52,214.03 52,214.03 52,145.07 52,145.07 52,070.58 52,070.58 52,059.31 52,059.31 52,120.42 52,120.42 52,196.22 52,196.22
53 Cat Marka (Thermoplastic) Kg 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,232,000 1,232,000 1,235,333.36 1,235,333.36 1,237,036.38 1,237,036.38 1,237,070.82 1,237,070.82 1,235,436.96 1,235,436.96 1,233,672.24 1,233,672.24 1,233,405.19 1,233,405.19 1,234,853.11 1,234,853.11 1,236,649.01 1,236,649.01
57 Curing Compound Liter 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 576,000 576,000 577,558.46 577,558.46 578,354.67 578,354.67 578,370.77 578,370.77 577,606.89 577,606.89 576,781.83 576,781.83 576,656.97 576,656.97 577,333.92 577,333.92 578,173.56 578,173.56
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 670,000 670,000 671,812.79 671,812.79 672,738.94 672,738.94 672,757.67 672,757.67 671,869.12 671,869.12 670,909.42 670,909.42 670,764.18 670,764.18 671,551.61 671,551.61 672,528.28 672,528.28
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 850,000 850,000 852,299.81 852,299.81 853,474.78 853,474.78 853,498.53 853,498.53 852,371.28 852,371.28 851,153.74 851,153.74 850,969.49 850,969.49 851,968.46 851,968.46 853,207.52 853,207.52
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
64 Oxygen (Isi 6 M3) Botol 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,303,000 1,303,000 1,306,525.47 1,306,525.47 1,308,326.63 1,308,326.63 1,308,363.05 1,308,363.05 1,306,635.03 1,306,635.03 1,304,768.61 1,304,768.61 1,304,486.17 1,304,486.17 1,306,017.54 1,306,017.54 1,307,916.93 1,307,916.93
67 Seal Coat M2 104,000 104,000 104,281.39 104,281.39 104,425.15 104,425.15 104,428.06 104,428.06 104,290.13 104,290.13 104,141.16 104,141.16 104,118.62 104,118.62 104,240.85 104,240.85 104,392.45 104,392.45
68 Seal Guard Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
69 Semen/PC (50 kg) Zak 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 11,000 9,000 11,029.76 9,024.35 11,044.97 9,036.79 11,045.28 9,037.04 11,030.69 9,025.11 11,014.93 9,012.22 11,012.55 9,010.27 11,025.47 9,020.84 11,041.51 9,033.96
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
84 Baja Tulangan (Ulir) D36 Kg 10,000 11,000 10,027.06 11,029.76 10,040.88 11,044.97 10,041.16 11,045.28 10,027.90 11,030.69 10,013.57 11,014.93 10,011.41 11,012.55 10,023.16 11,025.47 10,037.74 11,041.51
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,276,000 12,276,000 12,309,214.60 12,309,214.60 12,326,183.94 12,326,183.94 12,326,527.07 12,326,527.07 12,310,246.83 12,310,246.83 12,292,662.71 12,292,662.71 12,290,001.67 12,290,001.67 12,304,429.24 12,304,429.24 12,322,324.07 12,322,324.07
87 Box Culvert Type DUB 200×200 M' 13,032,000 13,032,000 13,067,260.07 13,067,260.07 13,085,274.45 13,085,274.45 13,085,638.71 13,085,638.71 13,068,355.88 13,068,355.88 13,049,688.86 13,049,688.86 13,046,863.94 13,046,863.94 13,062,180.02 13,062,180.02 13,081,176.87 13,081,176.87
88 Box Culvert Type uk 300×200 M' 14,070,000 14,070,000 14,108,068.54 14,108,068.54 14,127,517.76 14,127,517.76 14,127,911.04 14,127,911.04 14,109,251.62 14,109,251.62 14,089,097.78 14,089,097.78 14,086,047.85 14,086,047.85 14,102,583.86 14,102,583.86 14,123,093.81 14,123,093.81
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 183,000 183,000 183,495.13 183,495.13 183,748.10 183,748.10 183,753.21 183,753.21 183,510.52 183,510.52 183,248.39 183,248.39 183,208.72 183,208.72 183,423.80 183,423.80 183,690.56 183,690.56
91 Ducting (Strand Prestress) M' 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,055,000 2,055,000 2,060,560.12 2,060,560.12 2,063,400.78 2,063,400.78 2,063,458.22 2,063,458.22 2,060,732.91 2,060,732.91 2,057,789.34 2,057,789.34 2,057,343.88 2,057,343.88 2,059,759.05 2,059,759.05 2,062,754.64 2,062,754.64
94 Expansion Join Tipe Rubber M' 1,488,000 1,488,000 1,492,026.01 1,492,026.01 1,494,082.90 1,494,082.90 1,494,124.49 1,494,124.49 1,492,151.13 1,492,151.13 1,490,019.72 1,490,019.72 1,489,697.17 1,489,697.17 1,491,445.97 1,491,445.97 1,493,615.04 1,493,615.04
95 Expansion Join Tipe Torma M' 1,706,000 1,706,000 1,710,615.84 1,710,615.84 1,712,974.08 1,712,974.08 1,713,021.76 1,713,021.76 1,710,759.29 1,710,759.29 1,708,315.62 1,708,315.62 1,707,945.82 1,707,945.82 1,709,950.82 1,709,950.82 1,712,437.67 1,712,437.67
96 Expansion Tipe Joint Asphaltic Plug M' 2,024,000 2,024,000 2,029,476.24 2,029,476.24 2,032,274.05 2,032,274.05 2,032,330.63 2,032,330.63 2,029,646.43 2,029,646.43 2,026,747.26 2,026,747.26 2,026,308.52 2,026,308.52 2,028,687.26 2,028,687.26 2,031,637.66 2,031,637.66
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
99 Glass Bead Kg 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
100 Joint Sealent Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
101 Joint Socket Pile 16×16×16 Set 86,000 86,000 86,232.69 86,232.69 86,351.57 86,351.57 86,353.97 86,353.97 86,239.92 86,239.92 86,116.73 86,116.73 86,098.09 86,098.09 86,199.16 86,199.16 86,324.53 86,324.53
102 Joint Socket Pile 35×35 Set 739,000 739,000 740,999.48 740,999.48 742,021.01 742,021.01 742,041.67 742,041.67 741,061.62 741,061.62 740,003.07 740,003.07 739,842.88 739,842.88 740,711.41 740,711.41 741,788.65 741,788.65
103 Kawat Beton Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
104 Kawat Bronjong Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
105 Kawat Las Dos 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
106 Kayu Acuan (Kelas III/Meranti) M3 4,061,000 4,061,000 4,071,987.66 4,071,987.66 4,077,601.25 4,077,601.25 4,077,714.76 4,077,714.76 4,072,329.13 4,072,329.13 4,066,512.16 4,066,512.16 4,065,631.86 4,065,631.86 4,070,404.62 4,070,404.62 4,076,324.38 4,076,324.38
107 Kayu Perancah (Gelam) M3 2,616,000 2,616,000 2,623,077.99 2,623,077.99 2,626,694.13 2,626,694.13 2,626,767.25 2,626,767.25 2,623,297.96 2,623,297.96 2,619,550.80 2,619,550.80 2,618,983.74 2,618,983.74 2,622,058.24 2,622,058.24 2,625,871.60 2,625,871.60
108 Kerb Pracetak Type 1 (Peninggi) Buah 52,000 52,000 52,140.69 52,140.69 52,212.57 52,212.57 52,214.03 52,214.03 52,145.07 52,145.07 52,070.58 52,070.58 52,059.31 52,059.31 52,120.42 52,120.42 52,196.22 52,196.22
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
110 Marmer Nama Jembatan Buah 567,000 567,000 568,534.11 568,534.11 569,317.88 569,317.88 569,333.73 569,333.73 568,581.78 568,581.78 567,769.61 567,769.61 567,646.70 567,646.70 568,313.08 568,313.08 569,139.60 569,139.60
111 Mata Kucing Buah 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
112 Matras Concrete (Tebal=10 cm) M2 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
113 Mini Pile 16×16×16 M' 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
114 Mini Timber Pile Buah 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
115 Multipleks 12 mm Lbr 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 62,776,000 62,776,000 62,945,850.09 62,945,850.09 63,032,626.51 63,032,626.51 63,034,381.19 63,034,381.19 62,951,128.64 62,951,128.64 62,861,208.42 62,861,208.42 62,847,600.57 62,847,600.57 62,921,379.14 62,921,379.14 63,012,888.20 63,012,888.20
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 88,933,000 88,933,000 89,173,621.86 89,173,621.86 89,296,555.59 89,296,555.59 89,299,041.39 89,299,041.39 89,181,099.83 89,181,099.83 89,053,712.38 89,053,712.38 89,034,434.53 89,034,434.53 89,138,954.55 89,138,954.55 89,268,592.87 89,268,592.87
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 169,976,000 169,976,000 170,435,896.12 170,435,896.12 170,670,857.09 170,670,857.09 170,675,608.14 170,675,608.14 170,450,188.63 170,450,188.63 170,206,715.35 170,206,715.35 170,169,869.94 170,169,869.94 170,369,637.12 170,369,637.12 170,617,412.46 170,617,412.46
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 222,897,000 222,897,000 223,500,082.00 223,500,082.00 223,808,196.64 223,808,196.64 223,814,426.90 223,814,426.90 223,518,824.39 223,518,824.39 223,199,547.17 223,199,547.17 223,151,230.17 223,151,230.17 223,413,193.66 223,413,193.66 223,738,112.35 223,738,112.35
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 284,135,000 284,135,000 284,903,770.80 284,903,770.80 285,296,535.85 285,296,535.85 285,304,477.80 285,304,477.80 284,927,662.41 284,927,662.41 284,520,668.00 284,520,668.00 284,459,076.55 284,459,076.55 284,793,011.04 284,793,011.04 285,207,196.83 285,207,196.83
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 342,808,000 342,808,000 343,735,519.59 343,735,519.59 344,209,389.42 344,209,389.42 344,218,971.35 344,218,971.35 343,764,344.75 343,764,344.75 343,273,307.26 343,273,307.26 343,198,997.35 343,198,997.35 343,601,888.28 343,601,888.28 344,101,602.16 344,101,602.16
124 Pelat Rambu (Eng. Grade) Buah 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
125 Pelat Rambu (High L Grade) Buah 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 260,000 260,000 260,703.47 260,703.47 261,062.87 261,062.87 261,070.14 261,070.14 260,725.33 260,725.33 260,352.91 260,352.91 260,296.55 260,296.55 260,602.12 260,602.12 260,981.12 260,981.12
129 Pipa Galvanis Dia 1,5" M' 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
130 Pipa Galvanis Dia 2" M' 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
131 Pipa Galvanis Dia 3" M' 228,000 228,000 228,616.89 228,616.89 228,932.06 228,932.06 228,938.43 228,938.43 228,636.06 228,636.06 228,309.47 228,309.47 228,260.05 228,260.05 228,528.01 228,528.01 228,860.37 228,860.37
132 Pipa Porus M' 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
133 Pipa PVC Dia 4" M' 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
134 Plastik Filter M2 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
135 Rel Pengaman M' 161,000 161,000 161,435.61 161,435.61 161,658.16 161,658.16 161,662.66 161,662.66 161,449.15 161,449.15 161,218.53 161,218.53 161,183.63 161,183.63 161,372.85 161,372.85 161,607.54 161,607.54
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,940,000 1,940,000 1,945,248.97 1,945,248.97 1,947,930.67 1,947,930.67 1,947,984.89 1,947,984.89 1,945,412.09 1,945,412.09 1,942,633.24 1,942,633.24 1,942,212.71 1,942,212.71 1,944,492.73 1,944,492.73 1,947,320.68 1,947,320.68
137 Strip Bearing Buah 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
138 Tiang Pancang Baja Diameter 400 M' 687,000 687,000 688,858.78 688,858.78 689,808.44 689,808.44 689,827.64 689,827.64 688,916.55 688,916.55 687,932.49 687,932.49 687,783.57 687,783.57 688,590.98 688,590.98 689,592.43 689,592.43
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 840,000 840,000 842,272.75 842,272.75 843,433.90 843,433.90 843,457.38 843,457.38 842,343.38 842,343.38 841,140.17 841,140.17 840,958.08 840,958.08 841,945.31 841,945.31 843,169.78 843,169.78
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,756,000 1,756,000 1,760,751.13 1,760,751.13 1,763,178.48 1,763,178.48 1,763,227.56 1,763,227.56 1,760,898.78 1,760,898.78 1,758,383.49 1,758,383.49 1,758,002.85 1,758,002.85 1,760,066.61 1,760,066.61 1,762,626.35 1,762,626.35
HARGA SATUAN DASAR UPAH KABUPATEN JOMBANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 113,292.46
2 Tukang OH 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 127,328.70
3 Mandor OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87
4 Operator OH 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 302,781.63
5 Pembantu Operator OH 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 189,489.17
6 Sopir OH 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 142,367.52
7 Pembantu Sopir OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
8 Mekanik OH 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 170,439.99
9 Pembantu Mekanik OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
10 Kepala Tukang OH 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 142,367.52
11 Pemasak Aspal OH 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 142,367.52

HARGA SATUAN DASAR ALAT KABUPATEN JOMBANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 446,624.27 499,070.08 446,172.88 498,565.69 445,523.85 497,840.44 445,278.97 497,566.81 445,656.13 497,988.25 446,295.87 498,703.12 446,603.71 499,047.11 445,922.87 907,041.49
2 Asphalt Distribution Unit/Jam 274,991.59 353,466.13 274,713.67 353,108.90 274,314.05 352,595.24 274,163.27 352,401.44 274,395.49 352,699.93 274,789.39 353,206.23 274,978.93 353,449.86 274,559.73 604,586.19
3 Asphalt Finisher Unit/Jam 201,976.58 957,973.55 201,772.45 957,005.37 201,478.94 955,613.24 201,368.20 955,088.00 201,538.76 955,896.97 201,828.07 957,269.17 201,967.28 957,929.46 201,659.39 1,141,320.18
4 Asphalt Liquid Mixer Unit/Jam 72,066.76 131,545.63 71,993.93 131,412.69 71,889.20 131,221.52 71,849.69 131,149.40 71,910.54 131,260.48 72,013.77 131,448.91 72,063.44 131,539.58 71,953.58 197,295.30
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 96,721.18 96,721.18 96,623.43 96,623.43 96,482.87 96,482.87 96,429.84 96,429.84 96,511.52 96,511.52 96,650.06 96,650.06 96,716.73 96,716.73 96,569.28 185,089.51
6 Asphalt Mixing Plant Unit/Jam 1,081,001.41 5,544,967.35 1,079,908.89 5,539,363.29 1,078,337.97 5,531,305.31 1,077,745.28 5,528,265.09 1,078,658.14 5,532,947.60 1,080,206.57 5,540,890.22 1,080,951.65 5,544,712.11 1,079,303.77 6,525,603.06
7 Asphalt Sprayer Unit/Jam 89,135.20 89,135.20 89,045.12 89,045.12 88,915.59 88,915.59 88,866.72 88,866.72 88,941.99 88,941.99 89,069.66 89,069.66 89,131.10 89,131.10 88,995.22 170,572.69
8 Asphalt Tanker Unit/Jam 417,228.62 484,007.60 416,806.94 483,518.44 416,200.62 482,815.07 415,971.86 482,549.70 416,324.19 482,958.43 416,921.83 483,651.72 417,209.41 483,985.32 416,573.39 865,099.46
9 Blending Equipment Unit/Jam 135,599.30 213,887.18 135,462.26 213,671.01 135,265.20 213,360.19 135,190.85 213,242.92 135,305.36 213,423.54 135,499.60 213,729.91 135,593.06 213,877.33 135,386.35 337,653.17
10 Bore Pile Machine Unit/Jam 373,609.26 649,694.85 373,231.67 649,038.23 372,688.74 648,094.09 372,483.89 647,737.88 372,799.39 648,286.52 373,334.55 649,217.14 373,592.06 649,664.95 373,022.53 990,605.62
11 Bore Pile Machine Dia 60 Unit/Jam 244,647.69 740,069.72 244,400.43 739,321.76 244,044.91 738,246.29 243,910.77 737,840.52 244,117.37 738,465.48 244,467.80 739,525.55 244,636.43 740,035.65 244,263.49 962,811.59
12 Bore Pile Machine Dia 80 Unit/Jam 967,211.79 967,211.79 966,234.27 966,234.27 964,828.71 964,828.71 964,298.41 964,298.41 965,115.18 965,115.18 966,500.61 966,500.61 967,167.27 967,167.27 965,692.85 1,850,895.12
13 Bulldozer 100-150 HP Unit/Jam 379,298.74 379,298.74 378,915.40 378,915.40 378,364.20 378,364.20 378,156.24 378,156.24 378,476.54 378,476.54 379,019.85 379,019.85 379,281.28 379,281.28 378,703.08 725,841.22
14 Cement Tanker Unit/Jam 352,747.83 454,886.81 352,391.32 454,427.08 351,878.71 453,766.03 351,685.30 453,516.63 351,983.18 453,900.76 352,488.46 454,552.34 352,731.59 454,865.87 352,193.86 777,010.92
15 Cold Milling Unit/Jam 550,931.42 1,171,860.73 550,374.62 1,170,676.38 549,574.00 1,168,973.43 549,271.93 1,168,330.91 549,737.17 1,169,320.50 550,526.33 1,170,999.08 550,906.06 1,171,806.79 550,066.22 1,674,238.56
16 Cold Recycler Unit/Jam 4,639,771.86 4,639,771.86 4,635,082.63 4,635,082.63 4,628,340.09 4,628,340.09 4,625,796.17 4,625,796.17 4,629,714.28 4,629,714.28 4,636,360.30 4,636,360.30 4,639,558.28 4,639,558.28 4,632,485.40 8,878,852.75
17 Compressor 4000-6500 L\M Unit/Jam 141,288.78 141,288.78 141,145.99 141,145.99 140,940.66 140,940.66 140,863.20 140,863.20 140,982.51 140,982.51 141,184.89 141,184.89 141,282.28 141,282.28 141,066.90 270,375.86
18 Concrete Breaker Unit/Jam 514,898.04 981,069.35 514,377.66 980,077.83 513,629.40 978,652.13 513,347.09 978,114.23 513,781.90 978,942.70 514,519.44 980,347.99 514,874.34 981,024.19 514,089.43 1,450,768.68
19 Concrete Mixer (350) Unit/Jam 95,772.93 95,772.93 95,676.14 95,676.14 95,536.96 95,536.96 95,484.45 95,484.45 95,565.33 95,565.33 95,702.51 95,702.51 95,768.52 95,768.52 95,622.53 183,274.91
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 109,048.39 109,048.39 108,938.18 108,938.18 108,779.71 108,779.71 108,719.92 108,719.92 108,812.01 108,812.01 108,968.21 108,968.21 109,043.37 109,043.37 108,877.13 208,679.35
21 Concrete Pan Mixer Unit/Jam 290,163.54 621,578.23 289,870.28 620,950.03 289,448.61 620,046.74 289,289.52 619,705.94 289,534.55 620,230.84 289,950.18 621,121.19 290,150.18 621,549.62 289,707.85 886,162.76
22 Concrete Pump Unit/Jam 220,941.52 236,982.98 220,718.22 236,743.47 220,397.15 236,399.08 220,276.01 236,269.15 220,462.58 236,469.27 220,779.06 236,808.73 220,931.35 236,972.07 220,594.54 438,818.78
23 Concrete Vibrator Unit/Jam 82,497.48 82,497.48 82,414.10 82,414.10 82,294.21 82,294.21 82,248.98 82,248.98 82,318.65 82,318.65 82,436.82 82,436.82 82,493.68 82,493.68 82,367.92 157,870.47
24 Crane 10-15 Ton Unit/Jam 295,853.02 295,853.02 295,554.01 295,554.01 295,124.08 295,124.08 294,961.87 294,961.87 295,211.70 295,211.70 295,635.48 295,635.48 295,839.40 295,839.40 295,388.40 566,156.15
25 Crane On Track 35 Ton Unit/Jam 245,595.94 466,936.80 245,347.72 466,464.88 244,990.82 465,786.33 244,856.16 465,530.31 245,063.56 465,924.62 245,415.35 466,593.46 245,584.63 466,915.30 245,210.24 690,975.45
26 Crane On Track 75-100 Ton Unit/Jam 385,936.47 585,428.28 385,546.42 584,836.62 384,985.57 583,985.87 384,773.97 583,664.89 385,099.88 584,159.26 385,652.70 584,997.83 385,918.70 585,401.33 385,330.38 937,721.97
27 Dump Truck 10 Ton Unit/Jam 365,075.04 365,075.04 364,706.07 364,706.07 364,175.54 364,175.54 363,975.38 363,975.38 364,283.67 364,283.67 364,806.60 364,806.60 365,058.23 365,058.23 364,501.71 698,622.18
28 Dump Truck 3-4 M3 Unit/Jam 199,131.84 261,082.94 198,930.59 260,819.07 198,641.21 260,439.67 198,532.02 260,296.52 198,700.18 260,516.99 198,985.42 260,890.97 199,122.67 261,070.92 198,819.12 442,920.45
29 Excavator 80-140 HP Unit/Jam 288,267.04 457,899.31 287,975.70 457,436.53 287,556.79 456,771.11 287,398.74 456,520.05 287,642.17 456,906.73 288,055.09 457,562.62 288,253.77 457,878.23 287,814.34 721,005.20
30 Flat Bed Truck 3-4 M3 Unit/Jam 349,903.09 467,940.96 349,549.46 467,468.03 349,040.98 466,788.02 348,849.13 466,531.45 349,144.61 466,926.61 349,645.81 467,596.89 349,886.98 467,919.42 349,353.59 787,441.03
31 Fulvi Mixer Unit/Jam 876,180.09 1,368,677.10 875,294.57 1,367,293.84 874,021.30 1,365,304.87 873,540.91 1,364,554.44 874,280.81 1,365,710.24 875,535.85 1,367,670.73 876,139.76 1,368,614.10 874,804.11 2,168,416.80
32 Generator Set Unit/Jam 389,729.46 413,716.04 389,335.57 413,297.92 388,769.22 412,696.70 388,555.53 412,469.87 388,884.65 412,819.24 389,442.89 413,411.84 389,711.52 413,697.00 389,117.41 769,750.77
33 Hot Recycler Unit/Jam 2,862,757.25 8,394,820.66 2,859,863.98 8,386,336.37 2,855,703.81 8,374,136.97 2,854,134.20 8,369,534.21 2,856,551.69 8,376,623.31 2,860,652.31 8,388,648.07 2,862,625.47 8,394,434.23 2,858,261.48 11,001,662.30
34 Jack Hammer Unit/Jam 54,050.07 54,050.07 53,995.44 53,995.44 53,916.90 53,916.90 53,887.26 53,887.26 53,932.91 53,932.91 54,010.33 54,010.33 54,047.58 54,047.58 53,965.19 103,432.37
35 Launching Gantry Unit/Jam 68,784,878.54 68,784,878.54 68,715,360.55 68,715,360.55 68,615,401.97 68,615,401.97 68,577,688.27 68,577,688.27 68,635,774.42 68,635,774.42 68,734,302.01 68,734,302.01 68,781,712.21 68,781,712.21 68,676,856.48 131,629,491.00
36 Motor Grader > 100 HP Unit/Jam 270,250.35 280,162.08 269,977.22 279,878.93 269,584.49 279,471.80 269,436.32 279,318.19 269,664.54 279,554.77 270,051.64 279,956.08 270,237.91 280,149.18 269,825.94 527,058.03
37 Pedestrian Roller Unit/Jam 89,135.20 89,135.20 89,045.12 89,045.12 88,915.59 88,915.59 88,866.72 88,866.72 88,941.99 88,941.99 89,069.66 89,069.66 89,131.10 89,131.10 88,995.22 170,572.69
38 Pile Driver + Hammer Unit/Jam 101,462.41 297,232.88 101,359.87 296,932.48 101,212.42 296,500.54 101,156.79 296,337.58 101,242.47 296,588.58 101,387.81 297,014.33 101,457.74 297,219.20 101,303.07 389,625.55
39 Rock Drill Breaker Unit/Jam 98,617.67 320,328.68 98,518.00 320,004.94 98,374.69 319,539.44 98,320.62 319,363.81 98,403.90 319,634.31 98,545.16 320,093.15 98,613.13 320,313.94 98,462.80 410,081.55
40 Split Form Paver Unit/Jam 208,614.31 208,614.31 208,403.47 208,403.47 208,100.31 208,100.31 207,985.93 207,985.93 208,162.10 208,162.10 208,460.92 208,460.92 208,604.70 208,604.70 208,286.69 399,212.67
41 Stone Crusher Unit/Jam 558,517.40 695,886.45 557,952.93 695,183.15 557,141.29 694,171.88 556,835.06 693,790.34 557,306.71 694,377.99 558,106.73 695,374.77 558,491.69 695,854.42 557,640.28 1,205,954.52
42 Tamper Unit/Jam 83,445.72 83,445.72 83,361.39 83,361.39 83,240.12 83,240.12 83,194.37 83,194.37 83,264.84 83,264.84 83,384.37 83,384.37 83,441.88 83,441.88 83,314.68 159,685.07
43 Tandem Roller 6-8 T Unit/Jam 403,004.91 469,949.29 402,597.61 469,474.33 402,011.96 468,791.40 401,791.00 468,533.73 402,131.32 468,930.59 402,708.59 469,603.74 402,986.36 469,927.66 402,372.02 838,045.54
44 Three Wheel Roller 6-8 T Unit/Jam 133,702.81 168,699.75 133,567.68 168,529.25 133,373.38 168,284.09 133,300.07 168,191.60 133,412.98 168,334.06 133,604.50 168,575.70 133,696.65 168,691.98 133,492.84 290,801.01
45 Tire Roller 8-10 T Unit/Jam 238,958.21 431,791.01 238,716.70 431,354.62 238,369.45 430,727.14 238,238.43 430,490.40 238,440.22 430,855.03 238,782.50 431,473.53 238,947.21 431,771.14 238,582.94 649,809.95
46 Track Loader 75-100 HP Unit/Jam 223,786.26 295,224.55 223,560.09 294,926.18 223,234.88 294,497.16 223,112.18 294,335.29 223,301.16 294,584.60 223,621.71 295,007.48 223,775.96 295,210.96 223,434.82 499,572.43
47 Trailer 20 Ton Unit/Jam 361,282.05 500,074.25 360,916.92 499,568.84 360,391.90 498,842.13 360,193.82 498,567.95 360,498.90 498,990.24 361,016.41 499,706.55 361,265.42 500,051.23 360,714.68 829,937.99
48 Trailler 15 Ton Unit/Jam 312,921.46 475,974.28 312,605.21 475,493.23 312,150.47 474,801.55 311,978.90 474,540.58 312,243.15 474,942.52 312,691.38 475,624.30 312,907.06 475,952.37 312,430.04 761,615.76
49 Truck Mixer (agitator) Unit/Jam 393,522.44 578,399.13 393,124.73 577,814.56 392,552.86 576,974.03 392,337.10 576,656.90 392,669.41 577,145.34 393,233.09 577,973.84 393,504.33 578,372.50 392,904.44 937,646.61
50 Vibrating Rammer Unit/Jam 80,600.98 80,600.98 80,519.52 80,519.52 80,402.39 80,402.39 80,358.20 80,358.20 80,426.26 80,426.26 80,541.72 80,541.72 80,597.27 80,597.27 80,474.40 154,241.26
51 Vibratory Roller 5-8 T Unit/Jam 194,390.61 236,982.98 194,194.14 236,743.47 193,911.65 236,399.08 193,805.07 236,269.15 193,969.23 236,469.27 194,247.67 236,808.73 194,381.66 236,972.07 194,085.33 414,519.11
52 Water Pump 70-100 MM Unit/Jam 60,687.80 60,687.80 60,626.46 60,626.46 60,538.27 60,538.27 60,505.00 60,505.00 60,556.25 60,556.25 60,643.18 60,643.18 60,685.01 60,685.01 60,592.49 116,134.60
53 Water Tanker 3000-4500 L Unit/Jam 219,993.27 219,993.27 219,770.93 219,770.93 219,451.24 219,451.24 219,330.62 219,330.62 219,516.39 219,516.39 219,831.51 219,831.51 219,983.14 219,983.14 219,647.79 420,987.91
54 Welding Set Unit/Jam 123,272.09 123,272.09 123,147.51 123,147.51 122,968.37 122,968.37 122,900.78 122,900.78 123,004.88 123,004.88 123,181.45 123,181.45 123,266.42 123,266.42 123,078.50 235,898.40
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 214,303.79 284,178.74 214,087.20 283,891.53 213,775.77 283,478.56 213,658.27 283,322.75 213,839.25 283,562.73 214,146.21 283,969.79 214,293.92 284,165.66 213,967.24 479,865.51
HARGA SATUAN DASAR BAHAN KABUPATEN JOMBANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
2 Agregat Pecah Mesin 20-30 mm M3 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 543,815.78
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 326,353.67 326,353.67 326,023.84 326,023.84 325,549.58 325,549.58 325,370.65 325,370.65 325,646.24 325,646.24 326,113.71 326,113.71 326,338.65 326,338.65 325,841.16 624,523.43
4 Bahan Agr. Base Kelas A M3 313,299.53 313,299.53 312,982.89 312,982.89 312,527.60 312,527.60 312,355.82 312,355.82 312,620.39 312,620.39 313,069.16 313,069.16 313,285.11 313,285.11 312,807.51 599,542.49
5 Bahan Agr. Base Kelas B M3 294,220.39 294,220.39 293,923.03 293,923.03 293,495.47 293,495.47 293,334.15 293,334.15 293,582.61 293,582.61 294,004.05 294,004.05 294,206.85 294,206.85 293,758.34 563,031.89
6 Bahan Agr. Base Kelas C M3 270,120.43 270,120.43 269,847.43 269,847.43 269,454.89 269,454.89 269,306.78 269,306.78 269,534.89 269,534.89 269,921.81 269,921.81 270,107.99 270,107.99 269,696.22 516,913.24
7 Bahan Agr. Base Kelas C2 M3 247,024.63 247,024.63 246,774.97 246,774.97 246,415.99 246,415.99 246,280.55 246,280.55 246,489.15 246,489.15 246,842.99 246,842.99 247,013.26 247,013.26 246,636.69 472,716.19
8 Bahan Agr. Base Kelas S M3 199,828.87 199,828.87 199,626.91 199,626.91 199,336.51 199,336.51 199,226.95 199,226.95 199,395.70 199,395.70 199,681.93 199,681.93 199,819.67 199,819.67 199,515.05 382,400.50
9 Bahan Pilihan M3 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
10 Bahan Tanah Timbunan M3 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 217,141.99
11 Batu Belah/Kerakal M3 321,332.85 321,332.85 321,008.09 321,008.09 320,541.13 320,541.13 320,364.95 320,364.95 320,636.30 320,636.30 321,096.58 321,096.58 321,318.06 321,318.06 320,828.22 614,915.37
12 Batu Kali M3 354,470.30 354,470.30 354,112.05 354,112.05 353,596.93 353,596.93 353,402.58 353,402.58 353,701.92 353,701.92 354,209.66 354,209.66 354,453.98 354,453.98 353,913.63 678,328.52
13 Chipping M3 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97 210,543.52 403,538.21
14 Chipping (kg) Kg 311.29 311.29 310.98 310.98 310.52 310.52 310.35 310.35 310.62 310.62 311.06 311.06 311.28 311.28 310.80 595.70
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 378,570.26 378,570.26 378,187.66 378,187.66 377,637.52 377,637.52 377,429.95 377,429.95 377,749.64 377,749.64 378,291.90 378,291.90 378,552.84 378,552.84 377,975.74 724,447.17
18 Kapur M3 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
19 Pasir Beton (Kasar) M3 450,870.15 450,870.15 450,414.48 450,414.48 449,759.27 449,759.27 449,512.06 449,512.06 449,892.81 449,892.81 450,538.63 450,538.63 450,849.40 450,849.40 450,162.09 862,803.13
20 Pasir Halus (untuk HRS) M3 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 543,815.78
21 Pasir Pasang (Sedang) M3 318,320.35 318,320.35 317,998.64 317,998.64 317,536.05 317,536.05 317,361.52 317,361.52 317,630.33 317,630.33 318,086.30 318,086.30 318,305.70 318,305.70 317,820.45 609,150.54
22 Pasir Urug M3 193,803.87 193,803.87 193,608.00 193,608.00 193,326.37 193,326.37 193,220.11 193,220.11 193,383.77 193,383.77 193,661.37 193,661.37 193,794.95 193,794.95 193,499.52 370,870.83
23 Pasir Urug (ada unsur lempung) M3 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
24 Sirtu M3 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
26 Anti Pengelupas Liter 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30 95,245.88 182,553.00
27 Arbocell Kg 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 257,495.81
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48 147,380.46 282,476.75
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 559,465.64 559,465.64 558,900.22 558,900.22 558,087.20 558,087.20 557,780.45 557,780.45 558,252.90 558,252.90 559,054.28 559,054.28 559,439.89 559,439.89 558,587.04 1,070,615.80
41 Beton K-125 (fc' 10 MPa) M3 578,430.58 578,430.58 577,845.99 577,845.99 577,005.41 577,005.41 576,688.26 576,688.26 577,176.72 577,176.72 578,005.27 578,005.27 578,403.95 578,403.95 577,522.19 1,106,907.86
42 Beton K-175 (fc' 15 MPa) M3 625,842.92 625,842.92 625,210.41 625,210.41 624,300.93 624,300.93 623,957.79 623,957.79 624,486.29 624,486.29 625,382.75 625,382.75 625,814.11 625,814.11 624,860.08 1,197,638.02
43 Beton K-250 (fc' 20 MPa) M3 696,961.44 696,961.44 696,257.05 696,257.05 695,244.22 695,244.22 694,862.09 694,862.09 695,450.64 695,450.64 696,448.97 696,448.97 696,929.35 696,929.35 695,866.91 1,333,733.25
44 Beton K-300 (fc' 25 MPa) M3 725,408.84 725,408.84 724,675.70 724,675.70 723,621.53 723,621.53 723,223.80 723,223.80 723,836.38 723,836.38 724,875.46 724,875.46 725,375.45 725,375.45 724,269.64 1,388,171.34
45 Beton K-350 (fc' 30 MPa) M3 753,856.25 753,856.25 753,094.36 753,094.36 751,998.85 751,998.85 751,585.52 751,585.52 752,222.12 752,222.12 753,301.95 753,301.95 753,821.55 753,821.55 752,672.37 1,442,609.43
46 Beton K-400 (fc' 35 MPa) M3 782,303.65 782,303.65 781,513.01 781,513.01 780,376.16 780,376.16 779,947.24 779,947.24 780,607.86 780,607.86 781,728.44 781,728.44 782,267.64 782,267.64 781,075.10 1,497,047.52
47 Beton K-450 (fc' 40 MPa) M3 820,233.53 820,233.53 819,404.55 819,404.55 818,212.59 818,212.59 817,762.86 817,762.86 818,455.52 818,455.52 819,630.42 819,630.42 820,195.77 820,195.77 818,945.41 1,569,631.64
48 Beton K-500 (fc' 45 MPa) M3 853,422.17 853,422.17 852,559.65 852,559.65 851,319.45 851,319.45 850,851.53 850,851.53 851,572.22 851,572.22 852,794.66 852,794.66 853,382.88 853,382.88 852,081.93 1,633,142.75
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 61,254.07 61,254.07 61,192.17 61,192.17 61,103.15 61,103.15 61,069.57 61,069.57 61,121.29 61,121.29 61,209.03 61,209.03 61,251.25 61,251.25 61,157.88 117,218.24
51 Cat Anti Karat Kg 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
52 Cat Marka (Non Thermoplas) Kg 52,216.59 52,216.59 52,163.81 52,163.81 52,087.93 52,087.93 52,059.30 52,059.30 52,103.40 52,103.40 52,178.19 52,178.19 52,214.18 52,214.18 52,134.59 99,923.75
53 Cat Marka (Thermoplastic) Kg 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,237,131.47 1,237,131.47 1,235,881.15 1,235,881.15 1,234,083.34 1,234,083.34 1,233,405.04 1,233,405.04 1,234,449.75 1,234,449.75 1,236,221.82 1,236,221.82 1,237,074.52 1,237,074.52 1,235,188.63 2,367,424.19
57 Curing Compound Liter 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 578,399.13 578,399.13 577,814.56 577,814.56 576,974.03 576,974.03 576,656.90 576,656.90 577,145.34 577,145.34 577,973.84 577,973.84 578,372.50 578,372.50 577,490.79 1,106,847.67
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 672,790.65 672,790.65 672,110.69 672,110.69 671,132.99 671,132.99 670,764.11 670,764.11 671,332.25 671,332.25 672,295.96 672,295.96 672,759.68 672,759.68 671,734.08 1,287,479.06
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 853,540.38 853,540.38 852,677.74 852,677.74 851,437.37 851,437.37 850,969.39 850,969.39 851,690.17 851,690.17 852,912.78 852,912.78 853,501.09 853,501.09 852,199.95 1,633,368.96
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
64 Oxygen (Isi 6 M3) Botol 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,308,427.19 1,308,427.19 1,307,104.82 1,307,104.82 1,305,203.41 1,305,203.41 1,304,486.01 1,304,486.01 1,305,590.93 1,305,590.93 1,307,465.12 1,307,465.12 1,308,366.96 1,308,366.96 1,306,372.39 2,503,858.54
67 Seal Coat M2 104,433.18 104,433.18 104,327.63 104,327.63 104,175.87 104,175.87 104,118.61 104,118.61 104,206.80 104,206.80 104,356.39 104,356.39 104,428.37 104,428.37 104,269.17 199,847.50
68 Seal Guard Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
69 Semen/PC (50 kg) Zak 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 11,045.82 9,037.49 11,034.65 9,028.35 11,018.60 9,015.22 11,012.55 9,010.26 11,021.87 9,017.90 11,037.69 9,030.84 11,045.31 9,037.07 11,028.47 19,132.54
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 11,045.82 10,031.50 11,034.65 10,016.91 11,018.60 10,011.40 11,012.55 10,019.88 11,021.87 10,034.27 11,037.69 10,041.19 11,045.31 10,025.88 20,218.69
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,327,131.39 12,327,131.39 12,314,672.88 12,314,672.88 12,296,759.02 12,296,759.02 12,290,000.24 12,290,000.24 12,300,410.02 12,300,410.02 12,318,067.43 12,318,067.43 12,326,563.94 12,326,563.94 12,307,772.45 23,589,691.01
87 Box Culvert Type DUB 200×200 M' 13,086,280.25 13,086,280.25 13,073,054.49 13,073,054.49 13,054,037.43 13,054,037.43 13,046,862.43 13,046,862.43 13,057,913.28 13,057,913.28 13,076,658.09 13,076,658.09 13,085,677.85 13,085,677.85 13,065,729.12 25,042,428.57
88 Box Culvert Type uk 300×200 M' 14,128,603.67 14,128,603.67 14,114,324.49 14,114,324.49 14,093,792.72 14,093,792.72 14,086,046.22 14,086,046.22 14,097,977.27 14,097,977.27 14,118,215.11 14,118,215.11 14,127,953.30 14,127,953.30 14,106,415.64 27,037,060.32
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 183,762.22 183,762.22 183,576.50 183,576.50 183,309.46 183,309.46 183,208.70 183,208.70 183,363.88 183,363.88 183,627.10 183,627.10 183,753.76 183,753.76 183,473.64 351,654.73
91 Ducting (Strand Prestress) M' 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,063,559.38 2,063,559.38 2,061,473.83 2,061,473.83 2,058,475.06 2,058,475.06 2,057,343.64 2,057,343.64 2,059,086.23 2,059,086.23 2,062,042.08 2,062,042.08 2,063,464.39 2,063,464.39 2,060,318.70 3,948,909.66
94 Expansion Join Tipe Rubber M' 1,494,197.74 1,494,197.74 1,492,687.62 1,492,687.62 1,490,516.24 1,490,516.24 1,489,697.00 1,489,697.00 1,490,958.79 1,490,958.79 1,493,099.08 1,493,099.08 1,494,128.96 1,494,128.96 1,491,851.21 2,859,356.49
95 Expansion Join Tipe Torma M' 1,713,105.75 1,713,105.75 1,711,374.38 1,711,374.38 1,708,884.89 1,708,884.89 1,707,945.62 1,707,945.62 1,709,392.27 1,709,392.27 1,711,846.13 1,711,846.13 1,713,026.89 1,713,026.89 1,710,415.43 3,278,267.58
96 Expansion Tipe Joint Asphaltic Plug M' 2,032,430.27 2,032,430.27 2,030,376.17 2,030,376.17 2,027,422.63 2,027,422.63 2,026,308.28 2,026,308.28 2,028,024.59 2,028,024.59 2,030,935.85 2,030,935.85 2,032,336.71 2,032,336.71 2,029,238.47 3,889,339.74
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
99 Glass Bead Kg 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
100 Joint Sealent Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
101 Joint Socket Pile 16×16×16 Set 86,358.20 86,358.20 86,270.92 86,270.92 86,145.43 86,145.43 86,098.08 86,098.08 86,171.01 86,171.01 86,294.71 86,294.71 86,354.23 86,354.23 86,222.58 165,258.51
102 Joint Socket Pile 35×35 Set 742,078.05 742,078.05 741,328.06 741,328.06 740,249.67 740,249.67 739,842.80 739,842.80 740,469.45 740,469.45 741,532.41 741,532.41 742,043.89 742,043.89 740,912.66 1,420,070.19
103 Kawat Beton Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
104 Kawat Bronjong Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
105 Kawat Las Dos 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
106 Kayu Acuan (Kelas III/Meranti) M3 4,077,914.68 4,077,914.68 4,073,793.30 4,073,793.30 4,067,867.25 4,067,867.25 4,065,631.39 4,065,631.39 4,069,075.03 4,069,075.03 4,074,916.25 4,074,916.25 4,077,726.96 4,077,726.96 4,071,510.58 7,803,660.41
107 Kayu Perancah (Gelam) M3 2,626,896.03 2,626,896.03 2,624,241.14 2,624,241.14 2,620,423.72 2,620,423.72 2,618,983.43 2,618,983.43 2,621,201.74 2,621,201.74 2,624,964.52 2,624,964.52 2,626,775.11 2,626,775.11 2,622,770.67 5,026,933.18
108 Kerb Pracetak Type 1 (Peninggi) Buah 52,216.59 52,216.59 52,163.81 52,163.81 52,087.93 52,087.93 52,059.30 52,059.30 52,103.40 52,103.40 52,178.19 52,178.19 52,214.18 52,214.18 52,134.59 99,923.75
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
110 Marmer Nama Jembatan Buah 569,361.64 569,361.64 568,786.21 568,786.21 567,958.81 567,958.81 567,646.64 567,646.64 568,127.44 568,127.44 568,943.00 568,943.00 569,335.43 569,335.43 568,467.50 1,089,553.18
111 Mata Kucing Buah 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
112 Matras Concrete (Tebal=10 cm) M2 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
113 Mini Pile 16×16×16 M' 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 245,966.15
114 Mini Timber Pile Buah 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
115 Multipleks 12 mm Lbr 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 63,037,471.51 63,037,471.51 62,973,762.18 62,973,762.18 62,882,155.77 62,882,155.77 62,847,593.28 62,847,593.28 62,900,825.97 62,900,825.97 62,991,120.97 62,991,120.97 63,034,569.74 63,034,569.74 62,938,475.37 120,631,023.34
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 89,303,419.36 89,303,419.36 89,213,164.14 89,213,164.14 89,083,387.90 89,083,387.90 89,034,424.19 89,034,424.19 89,109,837.45 89,109,837.45 89,237,755.85 89,237,755.85 89,299,308.51 89,299,308.51 89,163,174.30 170,894,590.27
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 170,683,975.67 170,683,975.67 170,511,472.55 170,511,472.55 170,263,433.62 170,263,433.62 170,169,850.19 170,169,850.19 170,313,986.15 170,313,986.15 170,558,474.22 170,558,474.22 170,676,118.68 170,676,118.68 170,415,927.88 326,627,673.38
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 223,825,399.62 223,825,399.62 223,599,188.69 223,599,188.69 223,273,924.34 223,273,924.34 223,151,204.27 223,151,204.27 223,340,216.10 223,340,216.10 223,660,824.04 223,660,824.04 223,815,096.40 223,815,096.40 223,473,896.77 428,321,224.84
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 285,318,465.12 285,318,465.12 285,030,105.74 285,030,105.74 284,615,479.31 284,615,479.31 284,459,043.53 284,459,043.53 284,699,983.86 284,699,983.86 285,108,674.59 285,108,674.59 285,305,331.23 285,305,331.23 284,870,391.52 545,996,811.17
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 344,235,847.02 344,235,847.02 343,887,942.31 343,887,942.31 343,387,696.80 343,387,696.80 343,198,957.51 343,198,957.51 343,489,651.28 343,489,651.28 343,982,735.38 343,982,735.38 344,220,001.02 344,220,001.02 343,695,247.59 658,743,466.46
124 Pelat Rambu (Eng. Grade) Buah 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
125 Pelat Rambu (High L Grade) Buah 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 261,082.94 261,082.94 260,819.07 260,819.07 260,439.67 260,439.67 260,296.52 260,296.52 260,516.99 260,516.99 260,890.97 260,890.97 261,070.92 261,070.92 260,672.93 499,618.74
129 Pipa Galvanis Dia 1,5" M' 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
130 Pipa Galvanis Dia 2" M' 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
131 Pipa Galvanis Dia 3" M' 228,949.65 228,949.65 228,718.26 228,718.26 228,385.55 228,385.55 228,260.02 228,260.02 228,453.36 228,453.36 228,781.31 228,781.31 228,939.12 228,939.12 228,590.10 438,127.20
132 Pipa Porus M' 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
133 Pipa PVC Dia 4" M' 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 215,220.38
134 Plastik Filter M2 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
135 Rel Pengaman M' 161,670.59 161,670.59 161,507.20 161,507.20 161,272.25 161,272.25 161,183.61 161,183.61 161,320.14 161,320.14 161,551.72 161,551.72 161,663.15 161,663.15 161,416.70 309,379.30
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,948,080.39 1,948,080.39 1,946,111.55 1,946,111.55 1,943,280.59 1,943,280.59 1,942,212.49 1,942,212.49 1,943,857.56 1,943,857.56 1,946,648.00 1,946,648.00 1,947,990.72 1,947,990.72 1,945,021.06 3,727,924.45
137 Strip Bearing Buah 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
138 Tiang Pancang Baja Diameter 400 M' 689,861.46 689,861.46 689,164.24 689,164.24 688,161.73 688,161.73 687,783.49 687,783.49 688,366.05 688,366.05 689,354.21 689,354.21 689,829.70 689,829.70 688,778.08 1,320,146.44
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 843,498.73 843,498.73 842,646.24 842,646.24 841,420.46 841,420.46 840,957.98 840,957.98 841,670.29 841,670.29 842,878.51 842,878.51 843,459.90 843,459.90 842,174.07 1,614,152.85
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,763,314.00 1,763,314.00 1,761,531.90 1,761,531.90 1,758,969.44 1,758,969.44 1,758,002.64 1,758,002.64 1,759,491.69 1,759,491.69 1,762,017.47 1,762,017.47 1,763,232.84 1,763,232.84 1,760,544.84 3,374,348.11
HARGA SATUAN DASAR UPAH KOTA MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
2 Tukang OH 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
3 Mandor OH 157,000 157,000 157,424.79 157,424.79 157,641.81 157,641.81 157,646.20 157,646.20 157,437.99 157,437.99 157,213.10 157,213.10 157,179.07 157,179.07 157,363.59 157,363.59 157,592.45 157,592.45
4 Operator OH 324,000 324,000 324,876.63 324,876.63 325,324.50 325,324.50 325,333.56 325,333.56 324,903.88 324,903.88 324,439.78 324,439.78 324,369.55 324,369.55 324,750.33 324,750.33 325,222.63 325,222.63
5 Pembantu Operator OH 203,000 203,000 203,549.25 203,549.25 203,829.86 203,829.86 203,835.53 203,835.53 203,566.32 203,566.32 203,275.54 203,275.54 203,231.54 203,231.54 203,470.12 203,470.12 203,766.03 203,766.03
6 Sopir OH 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
7 Pembantu Sopir OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
8 Mekanik OH 182,000 182,000 182,492.43 182,492.43 182,744.01 182,744.01 182,749.10 182,749.10 182,507.73 182,507.73 182,247.04 182,247.04 182,207.58 182,207.58 182,421.48 182,421.48 182,686.79 182,686.79
9 Pembantu Mekanik OH 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
10 Kepala Tukang OH 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
11 Pemasak Aspal OH 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58

HARGA SATUAN DASAR ALAT KOTA MOJOKERTO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 477,075 533,000 478,365.73 534,442.11 479,025.20 535,178.89 479,038.53 535,193.79 478,405.85 534,486.93 477,722.48 533,723.46 477,619.07 533,607.93 478,179.76 534,234.34 478,875.20 535,011.30
2 Asphalt Distribution Unit/Jam 293,740 378,000 294,535.16 379,022.74 294,941.21 379,545.25 294,949.42 379,555.82 294,559.86 379,054.52 294,139.11 378,513.07 294,075.44 378,431.14 294,420.66 378,875.39 294,848.85 379,426.40
3 Asphalt Finisher Unit/Jam 215,747 1,023,000 216,331.00 1,025,767.88 216,629.23 1,027,182.00 216,635.26 1,027,210.59 216,349.14 1,025,853.90 216,040.10 1,024,388.56 215,993.34 1,024,166.81 216,246.90 1,025,369.10 216,561.39 1,026,860.34
4 Asphalt Liquid Mixer Unit/Jam 76,980 141,000 77,188.53 141,381.50 77,294.94 141,576.40 77,297.09 141,580.35 77,195.00 141,393.35 77,084.73 141,191.39 77,068.05 141,160.82 77,158.52 141,326.53 77,270.73 141,532.07
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 103,316 104,000 103,595.13 104,281.39 103,737.94 104,425.15 103,740.83 104,428.06 103,603.81 104,290.13 103,455.82 104,141.16 103,433.43 104,118.62 103,554.85 104,240.85 103,705.46 104,392.45
6 Asphalt Mixing Plant Unit/Jam 1,154,704 5,848,041 1,157,827.88 5,863,863.77 1,159,424.05 5,871,947.63 1,159,456.33 5,872,111.09 1,157,924.98 5,864,355.51 1,156,270.98 5,855,978.78 1,156,020.68 5,854,711.11 1,157,377.76 5,861,584.12 1,159,060.98 5,870,108.86
7 Asphalt Sprayer Unit/Jam 95,212 95,212 95,470.02 95,470.02 95,601.63 95,601.63 95,604.29 95,604.29 95,478.02 95,478.02 95,341.64 95,341.64 95,321.00 95,321.00 95,432.90 95,432.90 95,571.70 95,571.70
8 Asphalt Tanker Unit/Jam 445,675 517,000 446,880.94 518,398.82 447,497.00 519,113.48 447,509.46 519,127.93 446,918.41 518,442.29 446,280.03 517,701.75 446,183.42 517,589.68 446,707.21 518,197.29 447,356.87 518,950.92
9 Blending Equipment Unit/Jam 144,844 229,000 145,236.30 229,619.59 145,436.53 229,936.15 145,440.57 229,942.55 145,248.48 229,638.85 145,041.01 229,310.83 145,009.61 229,261.19 145,179.84 229,530.33 145,390.98 229,864.14
10 Bore Pile Machine Unit/Jam 399,082 694,000 400,161.57 695,877.72 400,713.22 696,837.05 400,724.38 696,856.45 400,195.12 695,936.08 399,623.48 694,941.99 399,536.97 694,791.56 400,006.00 695,607.19 400,587.74 696,618.84
11 Bore Pile Machine Dia 60 Unit/Jam 261,328 790,000 262,034.73 792,137.47 262,395.97 793,229.50 262,403.27 793,251.58 262,056.71 792,203.89 261,682.38 791,072.30 261,625.73 790,901.05 261,932.86 791,829.51 262,313.80 792,981.10
12 Bore Pile Machine Dia 80 Unit/Jam 1,033,156 1,033,156 1,035,951.26 1,035,951.26 1,037,379.41 1,037,379.41 1,037,408.29 1,037,408.29 1,036,038.14 1,036,038.14 1,034,558.25 1,034,558.25 1,034,334.29 1,034,334.29 1,035,548.52 1,035,548.52 1,037,054.56 1,037,054.56
13 Bulldozer 100-150 HP Unit/Jam 405,159 587,000 406,255.40 588,588.22 406,815.46 589,399.64 406,826.78 589,416.05 406,289.47 588,637.58 405,709.12 587,796.76 405,621.29 587,669.52 406,097.46 588,359.40 406,688.06 589,215.07
14 Cement Tanker Unit/Jam 376,798 486,000 377,817.52 487,314.95 378,338.37 487,986.75 378,348.91 488,000.34 377,849.20 487,355.81 377,309.48 486,659.67 377,227.80 486,554.32 377,670.64 487,125.50 378,219.90 487,833.94
15 Cold Milling Unit/Jam 588,494 1,391,555 590,085.96 1,395,320.07 590,899.45 1,397,243.64 590,915.90 1,397,282.53 590,135.45 1,395,437.07 589,292.49 1,393,443.81 589,164.92 1,393,142.17 589,856.56 1,394,777.62 590,714.41 1,396,806.10
16 Cold Recycler Unit/Jam 4,956,110 4,956,110 4,969,519.15 4,969,519.15 4,976,370.07 4,976,370.07 4,976,508.60 4,976,508.60 4,969,935.88 4,969,935.88 4,962,836.76 4,962,836.76 4,961,762.43 4,961,762.43 4,967,587.19 4,967,587.19 4,974,811.75 4,974,811.75
17 Compressor 4000-6500 L\M Unit/Jam 150,922 153,028 151,330.14 153,442.04 151,538.76 153,653.57 151,542.98 153,657.85 151,342.83 153,454.91 151,126.65 153,235.71 151,093.93 153,202.54 151,271.30 153,382.39 151,491.30 153,605.46
18 Concrete Breaker Unit/Jam 550,004 1,048,000 551,491.70 1,050,835.52 552,251.98 1,052,284.19 552,267.36 1,052,313.49 551,537.95 1,050,923.65 550,750.13 1,049,422.49 550,630.90 1,049,195.32 551,277.30 1,050,427.00 552,079.05 1,051,954.68
19 Concrete Mixer (350) Unit/Jam 102,303 103,000 102,579.49 103,278.68 102,720.90 103,421.06 102,723.76 103,423.94 102,588.09 103,287.34 102,441.55 103,139.81 102,419.38 103,117.48 102,539.61 103,238.53 102,688.74 103,388.68
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 116,483 117,000 116,798.43 117,316.56 116,959.44 117,478.29 116,962.70 117,481.56 116,808.22 117,326.40 116,641.37 117,158.81 116,616.12 117,133.45 116,753.02 117,270.95 116,922.82 117,441.51
21 Concrete Pan Mixer Unit/Jam 309,947 663,000 310,785.38 664,793.85 311,213.82 665,710.33 311,222.49 665,728.86 310,811.44 664,849.60 310,367.47 663,899.92 310,300.29 663,756.20 310,664.56 664,535.40 311,116.37 665,501.86
22 Concrete Pump Unit/Jam 236,005 253,000 236,643.77 253,684.53 236,970.00 254,034.26 236,976.60 254,041.33 236,663.61 253,705.80 236,325.56 253,343.41 236,274.40 253,288.56 236,551.77 253,585.91 236,895.80 253,954.71
23 Concrete Vibrator Unit/Jam 88,122 88,122 88,360.55 88,360.55 88,482.36 88,482.36 88,484.82 88,484.82 88,367.96 88,367.96 88,241.73 88,241.73 88,222.63 88,222.63 88,326.20 88,326.20 88,454.65 88,454.65
24 Crane 10-15 Ton Unit/Jam 316,024 380,240 316,879.21 381,268.80 317,316.06 381,794.41 317,324.89 381,805.04 316,905.78 381,300.77 316,453.11 380,756.12 316,384.61 380,673.69 316,756.02 381,120.57 317,216.69 381,674.85
25 Crane On Track 35 Ton Unit/Jam 262,341 498,000 263,050.37 499,347.42 263,413.01 500,035.81 263,420.34 500,049.73 263,072.43 499,389.29 262,696.65 498,675.96 262,639.79 498,568.01 262,948.11 499,153.29 263,330.52 499,879.23
26 Crane On Track 75-100 Ton Unit/Jam 412,249 625,000 413,364.87 626,691.03 413,934.73 627,554.98 413,946.25 627,572.45 413,399.53 626,743.59 412,809.03 625,848.34 412,719.66 625,712.86 413,204.17 626,447.40 413,805.11 627,358.47
27 Dump Truck 10 Ton Unit/Jam 389,966 419,000 391,020.82 420,133.67 391,559.88 420,712.86 391,570.78 420,724.57 391,053.61 420,168.90 390,495.02 419,568.73 390,410.49 419,477.90 390,868.81 419,970.34 391,437.26 420,581.12
28 Dump Truck 3-4 M3 Unit/Jam 212,709 256,430 213,284.08 257,123.81 213,578.11 257,478.28 213,584.06 257,485.45 213,301.97 257,145.37 212,997.29 256,778.06 212,951.18 256,722.48 213,201.17 257,023.85 213,511.23 257,397.65
29 Excavator 80-140 HP Unit/Jam 307,921 489,000 308,754.10 490,323.06 309,179.75 490,999.02 309,188.35 491,012.69 308,779.99 490,364.18 308,338.93 489,663.74 308,272.18 489,557.74 308,634.07 490,132.45 309,082.93 490,845.26
30 Flat Bed Truck 3-4 M3 Unit/Jam 373,759 499,000 374,770.60 500,350.12 375,287.26 501,039.90 375,297.71 501,053.85 374,802.03 500,392.08 374,266.66 499,677.31 374,185.64 499,569.15 374,624.91 500,155.60 375,169.74 500,883.00
31 Fulvi Mixer Unit/Jam 935,918 1,462,000 938,449.97 1,465,955.67 939,743.70 1,467,976.61 939,769.86 1,468,017.48 938,528.66 1,466,078.60 937,188.06 1,463,984.43 936,985.18 1,463,667.52 938,085.13 1,465,385.76 939,449.43 1,467,516.93
32 Generator Set Unit/Jam 416,301 545,737 417,427.42 547,213.58 418,002.88 547,967.96 418,014.52 547,983.21 417,462.43 547,259.46 416,866.12 546,477.75 416,775.88 546,359.45 417,265.14 547,000.84 417,871.99 547,796.36
33 Hot Recycler Unit/Jam 3,057,939 8,967,000 3,066,212.61 8,991,261.59 3,070,439.66 9,003,656.84 3,070,525.13 9,003,907.48 3,066,469.74 8,992,015.59 3,062,089.55 8,979,171.27 3,061,426.69 8,977,227.51 3,065,020.58 8,987,766.13 3,069,478.17 9,000,837.40
34 Jack Hammer Unit/Jam 57,735 58,000 57,891.39 58,156.93 57,971.20 58,237.10 57,972.82 58,238.72 57,896.25 58,161.80 57,813.55 58,078.73 57,801.03 58,066.15 57,868.89 58,134.32 57,953.05 58,218.87
35 Launching Gantry Unit/Jam 73,474,604 73,475,000 73,673,400.65 73,673,797.88 73,774,965.95 73,775,363.72 73,777,019.67 73,777,417.45 73,679,578.80 73,679,976.05 73,574,333.92 73,574,730.61 73,558,406.96 73,558,803.56 73,644,759.23 73,645,156.30 73,751,863.73 73,752,261.38
36 Motor Grader > 100 HP Unit/Jam 288,676 523,006 289,456.97 524,421.07 289,856.01 525,144.03 289,864.08 525,158.65 289,481.24 524,465.05 289,067.75 523,715.90 289,005.17 523,602.53 289,344.44 524,217.20 289,765.25 524,979.59
37 Pedestrian Roller Unit/Jam 95,212 96,000 95,470.02 96,259.74 95,601.63 96,392.45 95,604.29 96,395.13 95,478.02 96,267.81 95,341.64 96,130.30 95,321.00 96,109.49 95,432.90 96,222.32 95,571.70 96,362.26
38 Pile Driver + Hammer Unit/Jam 108,380 317,000 108,673.32 317,857.69 108,823.13 318,295.89 108,826.16 318,304.75 108,682.43 317,884.35 108,527.19 317,430.28 108,503.70 317,361.56 108,631.07 317,734.12 108,789.06 318,196.21
39 Rock Drill Breaker Unit/Jam 105,341 342,000 105,626.40 342,925.33 105,772.02 343,398.09 105,774.96 343,407.65 105,635.26 342,954.09 105,484.37 342,464.21 105,461.54 342,390.08 105,585.34 342,792.02 105,738.90 343,290.55
40 Split Form Paver Unit/Jam 222,838 743,000 223,440.47 745,010.30 223,748.50 746,037.36 223,754.73 746,058.13 223,459.21 745,072.78 223,140.01 744,008.50 223,091.71 743,847.45 223,353.60 744,720.67 223,678.44 745,803.75
41 Stone Crusher Unit/Jam 596,597 715,597 598,211.07 717,533.16 599,035.76 718,522.34 599,052.44 718,542.34 598,261.24 717,593.33 597,406.67 716,568.31 597,277.35 716,413.19 597,978.51 717,254.21 598,848.17 718,297.34
42 Tamper Unit/Jam 89,135 502,000 89,376.19 503,358.24 89,499.40 504,052.16 89,501.89 504,066.19 89,383.68 503,400.45 89,256.01 502,681.39 89,236.68 502,572.57 89,341.44 503,162.55 89,471.37 503,894.32
43 Tandem Roller 6-8 T Unit/Jam 430,482 431,000 431,646.36 432,166.14 432,241.42 432,761.92 432,253.45 432,773.96 431,682.56 432,202.38 431,065.94 431,585.01 430,972.62 431,491.59 431,478.55 431,998.13 432,106.07 432,626.40
44 Three Wheel Roller 6-8 T Unit/Jam 142,819 187,992 143,205.03 188,500.64 143,402.45 188,760.51 143,406.44 188,765.76 143,217.04 188,516.45 143,012.46 188,247.17 142,981.50 188,206.42 143,149.35 188,427.36 143,357.54 188,701.40
45 Tire Roller 8-10 T Unit/Jam 255,250 315,000 255,940.90 315,852.28 256,293.74 316,287.71 256,300.87 316,296.52 255,962.36 315,878.77 255,596.74 315,427.56 255,541.41 315,359.28 255,841.40 315,729.49 256,213.48 316,188.67
46 Track Loader 75-100 HP Unit/Jam 239,044 534,000 239,690.68 535,444.82 240,021.12 536,182.98 240,027.80 536,197.90 239,710.78 535,489.72 239,368.38 534,724.82 239,316.56 534,609.07 239,597.50 535,236.66 239,945.96 536,015.07
47 Trailer 20 Ton Unit/Jam 385,914 508,000 386,958.27 509,374.47 387,491.72 510,076.69 387,502.51 510,090.89 386,990.72 509,417.19 386,437.93 508,689.53 386,354.28 508,579.41 386,807.83 509,176.45 387,370.38 509,916.96
48 Trailler 15 Ton Unit/Jam 334,256 508,475 335,160.70 509,850.76 335,622.75 510,553.63 335,632.09 510,567.84 335,188.81 509,893.51 334,710.02 509,165.17 334,637.56 509,054.95 335,030.40 509,652.55 335,517.65 510,393.75
49 Truck Mixer (agitator) Unit/Jam 420,353 421,000 421,489.97 422,139.08 422,071.04 422,721.04 422,082.79 422,732.80 421,525.32 422,174.48 420,923.21 421,571.44 420,832.09 421,480.18 421,326.12 421,974.97 421,938.87 422,588.66
50 Vibrating Rammer Unit/Jam 86,096 446,000 86,329.27 447,206.72 86,448.28 447,823.24 86,450.69 447,835.70 86,336.51 447,244.22 86,213.19 446,605.37 86,194.52 446,508.70 86,295.71 447,032.86 86,421.21 447,683.00
51 Vibratory Roller 5-8 T Unit/Jam 207,644 296,442 208,205.89 297,244.07 208,492.92 297,653.85 208,498.73 297,662.13 208,223.35 297,269.00 207,925.92 296,844.37 207,880.91 296,780.11 208,124.95 297,128.51 208,427.63 297,560.64
52 Water Pump 70-100 MM Unit/Jam 64,825 213,000 65,000.86 213,576.30 65,090.47 213,870.74 65,092.28 213,876.69 65,006.31 213,594.21 64,913.46 213,289.11 64,899.41 213,242.94 64,975.59 213,493.27 65,070.09 213,803.77
53 Water Tanker 3000-4500 L Unit/Jam 234,992 235,000 235,628.13 235,635.83 235,952.96 235,960.67 235,959.53 235,967.24 235,647.89 235,655.59 235,311.29 235,318.98 235,260.35 235,268.03 235,536.53 235,544.22 235,879.08 235,886.78
54 Welding Set Unit/Jam 131,677 365,000 132,033.00 365,987.56 132,215.02 366,492.11 132,218.70 366,502.31 132,044.08 366,018.25 131,855.46 365,495.43 131,826.92 365,416.31 131,981.67 365,845.28 132,173.62 366,377.34
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 228,915 428,182 229,534.30 429,340.51 229,850.73 429,932.40 229,857.13 429,944.36 229,553.55 429,376.52 229,225.65 428,763.19 229,176.03 428,670.37 229,445.07 429,173.60 229,778.76 429,797.76
HARGA SATUAN DASAR BAHAN KOTA MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 319,000 319,000 319,863.10 319,863.10 320,304.06 320,304.06 320,312.98 320,312.98 319,889.93 319,889.93 319,432.99 319,432.99 319,363.84 319,363.84 319,738.75 319,738.75 320,203.76 320,203.76
2 Agregat Pecah Mesin 20-30 mm M3 304,000 304,000 304,822.52 304,822.52 305,242.74 305,242.74 305,251.24 305,251.24 304,848.08 304,848.08 304,412.63 304,412.63 304,346.73 304,346.73 304,704.02 304,704.02 305,147.16 305,147.16
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 348,000 348,000 348,941.57 348,941.57 349,422.61 349,422.61 349,432.34 349,432.34 348,970.83 348,970.83 348,472.35 348,472.35 348,396.92 348,396.92 348,805.91 348,805.91 349,313.19 349,313.19
4 Bahan Agr. Base Kelas A M3 360,000 360,000 360,974.04 360,974.04 361,471.67 361,471.67 361,481.73 361,481.73 361,004.31 361,004.31 360,488.64 360,488.64 360,410.61 360,410.61 360,833.70 360,833.70 361,358.48 361,358.48
5 Bahan Agr. Base Kelas B M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
6 Bahan Agr. Base Kelas C M3 289,000 289,000 289,781.93 289,781.93 290,181.42 290,181.42 290,189.50 290,189.50 289,806.23 289,806.23 289,392.27 289,392.27 289,329.63 289,329.63 289,669.28 289,669.28 290,090.56 290,090.56
7 Bahan Agr. Base Kelas C2 M3 263,000 263,000 263,711.59 263,711.59 264,075.14 264,075.14 264,082.49 264,082.49 263,733.70 263,733.70 263,356.98 263,356.98 263,299.97 263,299.97 263,609.07 263,609.07 263,992.44 263,992.44
8 Bahan Agr. Base Kelas S M3 213,000 213,000 213,576.30 213,576.30 213,870.74 213,870.74 213,876.69 213,876.69 213,594.21 213,594.21 213,289.11 213,289.11 213,242.94 213,242.94 213,493.27 213,493.27 213,803.77 213,803.77
9 Bahan Pilihan M3 213,000 213,000 213,576.30 213,576.30 213,870.74 213,870.74 213,876.69 213,876.69 213,594.21 213,594.21 213,289.11 213,289.11 213,242.94 213,242.94 213,493.27 213,493.27 213,803.77 213,803.77
10 Bahan Tanah Timbunan M3 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
11 Batu Belah/Kerakal M3 343,000 343,000 343,928.04 343,928.04 344,402.17 344,402.17 344,411.76 344,411.76 343,956.88 343,956.88 343,465.57 343,465.57 343,391.22 343,391.22 343,794.33 343,794.33 344,294.33 344,294.33
12 Batu Kali M3 378,000 378,000 379,022.74 379,022.74 379,545.25 379,545.25 379,555.82 379,555.82 379,054.52 379,054.52 378,513.07 378,513.07 378,431.14 378,431.14 378,875.39 378,875.39 379,426.40 379,426.40
13 Chipping M3 225,000 225,000 225,608.77 225,608.77 225,919.79 225,919.79 225,926.08 225,926.08 225,627.69 225,627.69 225,305.40 225,305.40 225,256.63 225,256.63 225,521.06 225,521.06 225,849.05 225,849.05
14 Chipping (kg) Kg 322 322 322.87 322.87 323.32 323.32 323.33 323.33 322.90 322.90 322.44 322.44 322.37 322.37 322.75 322.75 323.22 323.22
15 Filler Cement Kg 2,250 2,250 2,256.09 2,256.09 2,259.20 2,259.20 2,259.26 2,259.26 2,256.28 2,256.28 2,253.05 2,253.05 2,252.57 2,252.57 2,255.21 2,255.21 2,258.49 2,258.49
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 404,000 404,000 405,093.08 405,093.08 405,651.54 405,651.54 405,662.83 405,662.83 405,127.05 405,127.05 404,548.37 404,548.37 404,460.79 404,460.79 404,935.60 404,935.60 405,524.51 405,524.51
18 Kapur M3 101,000 101,000 101,273.27 101,273.27 101,412.89 101,412.89 101,415.71 101,415.71 101,281.76 101,281.76 101,137.09 101,137.09 101,115.20 101,115.20 101,233.90 101,233.90 101,381.13 101,381.13
19 Pasir Beton (Kasar) M3 481,000 481,000 482,301.42 482,301.42 482,966.31 482,966.31 482,979.76 482,979.76 482,341.86 482,341.86 481,652.88 481,652.88 481,548.62 481,548.62 482,113.92 482,113.92 482,815.08 482,815.08
20 Pasir Halus (untuk HRS) M3 304,000 304,000 304,822.52 304,822.52 305,242.74 305,242.74 305,251.24 305,251.24 304,848.08 304,848.08 304,412.63 304,412.63 304,346.73 304,346.73 304,704.02 304,704.02 305,147.16 305,147.16
21 Pasir Pasang (Sedang) M3 340,000 340,000 340,919.92 340,919.92 341,389.91 341,389.91 341,399.41 341,399.41 340,948.51 340,948.51 340,461.50 340,461.50 340,387.79 340,387.79 340,787.39 340,787.39 341,283.01 341,283.01
22 Pasir Urug M3 207,000 207,000 207,560.07 207,560.07 207,846.21 207,846.21 207,852.00 207,852.00 207,577.48 207,577.48 207,280.97 207,280.97 207,236.10 207,236.10 207,479.38 207,479.38 207,781.12 207,781.12
23 Pasir Urug (ada unsur lempung) M3 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
24 Sirtu M3 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 71,000 71,000 71,192.10 71,192.10 71,290.25 71,290.25 71,292.23 71,292.23 71,198.07 71,198.07 71,096.37 71,096.37 71,080.98 71,080.98 71,164.42 71,164.42 71,267.92 71,267.92
26 Anti Pengelupas Liter 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
27 Arbocell Kg 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
28 Asbuton Curah Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,900 10,900 10,929.49 10,929.49 10,944.56 10,944.56 10,944.86 10,944.86 10,930.41 10,930.41 10,914.80 10,914.80 10,912.43 10,912.43 10,925.24 10,925.24 10,941.13 10,941.13
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
40 Beton B-0 M3 597,610 597,610 599,226.71 599,226.71 600,052.80 600,052.80 600,069.50 600,069.50 599,276.96 599,276.96 598,420.95 598,420.95 598,291.40 598,291.40 598,993.75 598,993.75 599,864.89 599,864.89
41 Beton K-125 (fc' 10 MPa) M3 617,868 617,868 619,539.48 619,539.48 620,393.57 620,393.57 620,410.84 620,410.84 619,591.43 619,591.43 618,706.40 618,706.40 618,572.47 618,572.47 619,298.63 619,298.63 620,199.30 620,199.30
42 Beton K-175 (fc' 15 MPa) M3 668,513 668,513 670,321.41 670,321.41 671,245.50 671,245.50 671,264.19 671,264.19 670,377.62 670,377.62 669,420.04 669,420.04 669,275.13 669,275.13 670,060.81 670,060.81 671,035.31 671,035.31
43 Beton K-250 (fc' 20 MPa) M3 744,480 744,480 746,494.29 746,494.29 747,523.40 747,523.40 747,544.21 747,544.21 746,556.89 746,556.89 745,490.50 745,490.50 745,329.12 745,329.12 746,204.08 746,204.08 747,289.32 747,289.32
44 Beton K-300 (fc' 25 MPa) M3 774,867 774,867 776,963.45 776,963.45 778,034.56 778,034.56 778,056.22 778,056.22 777,028.60 777,028.60 775,918.68 775,918.68 775,750.72 775,750.72 776,661.39 776,661.39 777,790.92 777,790.92
45 Beton K-350 (fc' 30 MPa) M3 805,254 805,254 807,432.60 807,432.60 808,545.72 808,545.72 808,568.23 808,568.23 807,500.31 807,500.31 806,346.87 806,346.87 806,172.31 806,172.31 807,118.70 807,118.70 808,292.53 808,292.53
46 Beton K-400 (fc' 35 MPa) M3 835,641 835,641 837,901.76 837,901.76 839,056.88 839,056.88 839,080.24 839,080.24 837,972.02 837,972.02 836,775.05 836,775.05 836,593.91 836,593.91 837,576.01 837,576.01 838,794.13 838,794.13
47 Beton K-450 (fc' 40 MPa) M3 876,157 876,157 878,527.30 878,527.30 879,738.42 879,738.42 879,762.91 879,762.91 878,600.97 878,600.97 877,345.96 877,345.96 877,156.04 877,156.04 878,185.76 878,185.76 879,462.94 879,462.94
48 Beton K-500 (fc' 45 MPa) M3 911,608 911,608 914,074.64 914,074.64 915,334.78 915,334.78 915,360.26 915,360.26 914,151.30 914,151.30 912,845.51 912,845.51 912,647.90 912,647.90 913,719.29 913,719.29 915,048.14 915,048.14
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
51 Cat Anti Karat Kg 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
52 Cat Marka (Non Thermoplas) Kg 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
53 Cat Marka (Thermoplastic) Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
54 Cerucuk Diameter 10-15 cm M' 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
55 Cold Mix (Aspal Dingin) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,322,000 1,322,000 1,325,576.87 1,325,576.87 1,327,404.30 1,327,404.30 1,327,441.25 1,327,441.25 1,325,688.03 1,325,688.03 1,323,794.40 1,323,794.40 1,323,507.84 1,323,507.84 1,325,061.54 1,325,061.54 1,326,988.63 1,326,988.63
57 Curing Compound Liter 51,000 51,000 51,137.99 51,137.99 51,208.49 51,208.49 51,209.91 51,209.91 51,142.28 51,142.28 51,069.22 51,069.22 51,058.17 51,058.17 51,118.11 51,118.11 51,192.45 51,192.45
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 618,000 618,000 619,672.09 619,672.09 620,526.37 620,526.37 620,543.64 620,543.64 619,724.06 619,724.06 618,838.84 618,838.84 618,704.87 618,704.87 619,431.19 619,431.19 620,332.05 620,332.05
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 719,000 719,000 720,945.36 720,945.36 721,939.25 721,939.25 721,959.35 721,959.35 721,005.82 721,005.82 719,975.93 719,975.93 719,820.07 719,820.07 720,665.09 720,665.09 721,713.18 721,713.18
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 912,000 912,000 914,467.56 914,467.56 915,728.23 915,728.23 915,753.72 915,753.72 914,544.24 914,544.24 913,237.89 913,237.89 913,040.20 913,040.20 914,112.05 914,112.05 915,441.48 915,441.48
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
64 Oxygen (Isi 6 M3) Botol 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,215,000 1,215,000 1,218,287.37 1,218,287.37 1,219,966.89 1,219,966.89 1,220,000.85 1,220,000.85 1,218,389.53 1,218,389.53 1,216,649.17 1,216,649.17 1,216,385.80 1,216,385.80 1,217,813.74 1,217,813.74 1,219,584.86 1,219,584.86
67 Seal Coat M2 99,000 99,000 99,267.86 99,267.86 99,404.71 99,404.71 99,407.48 99,407.48 99,276.18 99,276.18 99,134.38 99,134.38 99,112.92 99,112.92 99,229.27 99,229.27 99,373.58 99,373.58
68 Seal Guard Kg 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
69 Semen/PC (50 kg) Zak 69,000 69,000 69,186.69 69,186.69 69,282.07 69,282.07 69,284.00 69,284.00 69,192.49 69,192.49 69,093.66 69,093.66 69,078.70 69,078.70 69,159.79 69,159.79 69,260.37 69,260.37
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
72 Solar Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
73 Thinner Liter 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
75 Baja Prategang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
77 Baja Tulangan (Polos) U25 Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
78 Baja Tulangan (Polos) U32 Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
79 Baja Tulangan (Polos) U36 Kg 10,500 10,500 10,528.41 10,528.41 10,542.92 10,542.92 10,543.22 10,543.22 10,529.29 10,529.29 10,514.25 10,514.25 10,511.98 10,511.98 10,524.32 10,524.32 10,539.62 10,539.62
80 Baja Tulangan (Ulir) D16 Kg 11,500 11,500 11,531.12 11,531.12 11,547.01 11,547.01 11,547.33 11,547.33 11,532.08 11,532.08 11,515.61 11,515.61 11,513.12 11,513.12 11,526.63 11,526.63 11,543.40 11,543.40
81 Baja Tulangan (Ulir) D19 Kg 11,500 11,500 11,531.12 11,531.12 11,547.01 11,547.01 11,547.33 11,547.33 11,532.08 11,532.08 11,515.61 11,515.61 11,513.12 11,513.12 11,526.63 11,526.63 11,543.40 11,543.40
82 Baja Tulangan (Ulir) D24 Kg 11,500 11,500 11,531.12 11,531.12 11,547.01 11,547.01 11,547.33 11,547.33 11,532.08 11,532.08 11,515.61 11,515.61 11,513.12 11,513.12 11,526.63 11,526.63 11,543.40 11,543.40
83 Baja Tulangan (Ulir) D32 Kg 11,500 11,500 11,531.12 11,531.12 11,547.01 11,547.01 11,547.33 11,547.33 11,532.08 11,532.08 11,515.61 11,515.61 11,513.12 11,513.12 11,526.63 11,526.63 11,543.40 11,543.40
84 Baja Tulangan (Ulir) D36 Kg 11,500 11,500 11,531.12 11,531.12 11,547.01 11,547.01 11,547.33 11,547.33 11,532.08 11,532.08 11,515.61 11,515.61 11,513.12 11,513.12 11,526.63 11,526.63 11,543.40 11,543.40
85 Besi Beton Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,168,000 13,168,000 13,203,628.04 13,203,628.04 13,221,830.41 13,221,830.41 13,222,198.47 13,222,198.47 13,204,735.28 13,204,735.28 13,185,873.46 13,185,873.46 13,183,019.06 13,183,019.06 13,198,494.97 13,198,494.97 13,217,690.07 13,217,690.07
87 Box Culvert Type DUB 200×200 M' 13,978,000 13,978,000 14,015,819.62 14,015,819.62 14,035,141.67 14,035,141.67 14,035,532.37 14,035,532.37 14,016,994.97 14,016,994.97 13,996,972.91 13,996,972.91 13,993,942.92 13,993,942.92 14,010,370.80 14,010,370.80 14,030,746.64 14,030,746.64
88 Box Culvert Type uk 300×200 M' 15,092,000 15,092,000 15,132,833.72 15,132,833.72 15,153,695.67 15,153,695.67 15,154,117.51 15,154,117.51 15,134,102.74 15,134,102.74 15,112,484.99 15,112,484.99 15,109,213.52 15,109,213.52 15,126,950.65 15,126,950.65 15,148,950.37 15,148,950.37
89 Casing M2 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
90 Ducting (Kabel Prestress) M' 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
91 Ducting (Strand Prestress) M' 171,000 171,000 171,462.67 171,462.67 171,699.04 171,699.04 171,703.82 171,703.82 171,477.05 171,477.05 171,232.11 171,232.11 171,195.04 171,195.04 171,396.01 171,396.01 171,645.28 171,645.28
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,204,000 2,204,000 2,209,963.26 2,209,963.26 2,213,009.89 2,213,009.89 2,213,071.49 2,213,071.49 2,210,148.58 2,210,148.58 2,206,991.58 2,206,991.58 2,206,513.82 2,206,513.82 2,209,104.11 2,209,104.11 2,212,316.90 2,212,316.90
94 Expansion Join Tipe Rubber M' 1,596,000 1,596,000 1,600,318.22 1,600,318.22 1,602,524.40 1,602,524.40 1,602,569.01 1,602,569.01 1,600,452.42 1,600,452.42 1,598,166.32 1,598,166.32 1,597,820.35 1,597,820.35 1,599,696.08 1,599,696.08 1,602,022.58 1,602,022.58
95 Expansion Join Tipe Torma M' 1,830,000 1,830,000 1,834,951.35 1,834,951.35 1,837,480.99 1,837,480.99 1,837,532.14 1,837,532.14 1,835,105.22 1,835,105.22 1,832,483.93 1,832,483.93 1,832,087.25 1,832,087.25 1,834,237.99 1,834,237.99 1,836,905.59 1,836,905.59
96 Expansion Tipe Joint Asphaltic Plug M' 2,171,000 2,171,000 2,176,873.97 2,176,873.97 2,179,874.99 2,179,874.99 2,179,935.67 2,179,935.67 2,177,056.52 2,177,056.52 2,173,946.79 2,173,946.79 2,173,476.18 2,173,476.18 2,176,027.69 2,176,027.69 2,179,192.37 2,179,192.37
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
99 Glass Bead Kg 80,000 80,000 80,216.45 80,216.45 80,327.04 80,327.04 80,329.27 80,329.27 80,223.18 80,223.18 80,108.59 80,108.59 80,091.25 80,091.25 80,185.27 80,185.27 80,301.88 80,301.88
100 Joint Sealent Kg 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
101 Joint Socket Pile 16×16×16 Set 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
102 Joint Socket Pile 35×35 Set 792,000 792,000 794,142.88 794,142.88 795,237.67 795,237.67 795,259.81 795,259.81 794,209.47 794,209.47 793,075.01 793,075.01 792,903.33 792,903.33 793,834.14 793,834.14 794,988.65 794,988.65
103 Kawat Beton Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
104 Kawat Bronjong Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
105 Kawat Las Dos 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
106 Kayu Acuan (Kelas III/Meranti) M3 4,355,000 4,355,000 4,366,783.12 4,366,783.12 4,372,803.12 4,372,803.12 4,372,924.84 4,372,924.84 4,367,149.31 4,367,149.31 4,360,911.22 4,360,911.22 4,359,967.19 4,359,967.19 4,365,085.48 4,365,085.48 4,371,433.80 4,371,433.80
107 Kayu Perancah (Gelam) M3 3,202,752 3,202,752 3,211,417.54 3,211,417.54 3,215,844.76 3,215,844.76 3,215,934.28 3,215,934.28 3,211,686.84 3,211,686.84 3,207,099.23 3,207,099.23 3,206,404.97 3,206,404.97 3,210,169.06 3,210,169.06 3,214,837.74 3,214,837.74
108 Kerb Pracetak Type 1 (Peninggi) Buah 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
110 Marmer Nama Jembatan Buah 608,000 608,000 609,645.04 609,645.04 610,485.49 610,485.49 610,502.48 610,502.48 609,696.16 609,696.16 608,825.26 608,825.26 608,693.47 608,693.47 609,408.03 609,408.03 610,294.32 610,294.32
111 Mata Kucing Buah 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
112 Matras Concrete (Tebal=10 cm) M2 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
113 Mini Pile 16×16×16 M' 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
114 Mini Timber Pile Buah 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
115 Multipleks 12 mm Lbr 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
116 Paku Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
117 Paving Block (Model Bata 8 cm) M2 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 67,336,000 67,336,000 67,518,187.87 67,518,187.87 67,611,267.67 67,611,267.67 67,613,149.80 67,613,149.80 67,523,849.85 67,523,849.85 67,427,397.89 67,427,397.89 67,412,801.59 67,412,801.59 67,491,939.36 67,491,939.36 67,590,095.57 67,590,095.57
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 95,392,000 95,392,000 95,650,097.68 95,650,097.68 95,781,959.80 95,781,959.80 95,784,626.13 95,784,626.13 95,658,118.76 95,658,118.76 95,521,479.45 95,521,479.45 95,500,801.49 95,500,801.49 95,612,912.56 95,612,912.56 95,751,966.21 95,751,966.21
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 182,322,000 182,322,000 182,815,300.12 182,815,300.12 183,067,327.19 183,067,327.19 183,072,423.32 183,072,423.32 182,830,630.74 182,830,630.74 182,569,473.07 182,569,473.07 182,529,951.45 182,529,951.45 182,744,228.48 182,744,228.48 183,010,000.67 183,010,000.67
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 239,086,000 239,086,000 239,732,883.82 239,732,883.82 240,063,376.81 240,063,376.81 240,070,059.58 240,070,059.58 239,752,987.47 239,752,987.47 239,410,521.16 239,410,521.16 239,358,694.90 239,358,694.90 239,639,684.79 239,639,684.79 239,988,202.30 239,988,202.30
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 304,771,000 304,771,000 305,595,604.66 305,595,604.66 306,016,895.24 306,016,895.24 306,025,413.99 306,025,413.99 305,621,231.46 305,621,231.46 305,184,678.09 305,184,678.09 305,118,613.40 305,118,613.40 305,476,800.70 305,476,800.70 305,921,067.75 305,921,067.75
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 367,706,000 367,706,000 368,700,884.95 368,700,884.95 369,209,171.74 369,209,171.74 369,219,449.60 369,219,449.60 368,731,803.67 368,731,803.67 368,205,102.33 368,205,102.33 368,125,395.33 368,125,395.33 368,557,548.05 368,557,548.05 369,093,555.94 369,093,555.94
124 Pelat Rambu (Eng. Grade) Buah 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
125 Pelat Rambu (High L Grade) Buah 241,000 241,000 241,652.06 241,652.06 241,985.20 241,985.20 241,991.94 241,991.94 241,672.33 241,672.33 241,327.12 241,327.12 241,274.88 241,274.88 241,558.12 241,558.12 241,909.42 241,909.42
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
128 Pipa Drainase Baja Dia 3" M' 279,000 279,000 279,754.88 279,754.88 280,140.54 280,140.54 280,148.34 280,148.34 279,778.34 279,778.34 279,378.70 279,378.70 279,318.22 279,318.22 279,646.12 279,646.12 280,052.82 280,052.82
129 Pipa Galvanis Dia 1,5" M' 111,000 111,000 111,300.33 111,300.33 111,453.76 111,453.76 111,456.87 111,456.87 111,309.66 111,309.66 111,150.66 111,150.66 111,126.60 111,126.60 111,257.06 111,257.06 111,418.86 111,418.86
130 Pipa Galvanis Dia 2" M' 319,000 319,000 319,863.10 319,863.10 320,304.06 320,304.06 320,312.98 320,312.98 319,889.93 319,889.93 319,432.99 319,432.99 319,363.84 319,363.84 319,738.75 319,738.75 320,203.76 320,203.76
131 Pipa Galvanis Dia 3" M' 244,000 244,000 244,660.18 244,660.18 244,997.47 244,997.47 245,004.29 245,004.29 244,680.70 244,680.70 244,331.19 244,331.19 244,278.30 244,278.30 244,565.06 244,565.06 244,920.75 244,920.75
132 Pipa Porus M' 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
133 Pipa PVC Dia 4" M' 121,000 121,000 121,327.38 121,327.38 121,494.64 121,494.64 121,498.03 121,498.03 121,337.56 121,337.56 121,164.24 121,164.24 121,138.01 121,138.01 121,280.22 121,280.22 121,456.60 121,456.60
134 Plastik Filter M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
135 Rel Pengaman M' 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,080,000 2,080,000 2,085,627.76 2,085,627.76 2,088,502.98 2,088,502.98 2,088,561.12 2,088,561.12 2,085,802.66 2,085,802.66 2,082,823.27 2,082,823.27 2,082,372.39 2,082,372.39 2,084,816.95 2,084,816.95 2,087,848.98 2,087,848.98
137 Strip Bearing Buah 319,000 319,000 319,863.10 319,863.10 320,304.06 320,304.06 320,312.98 320,312.98 319,889.93 319,889.93 319,432.99 319,432.99 319,363.84 319,363.84 319,738.75 319,738.75 320,203.76 320,203.76
138 Tiang Pancang Baja Diameter 400 M' 737,000 737,000 738,994.07 738,994.07 740,012.84 740,012.84 740,033.44 740,033.44 739,056.04 739,056.04 738,000.36 738,000.36 737,840.60 737,840.60 738,706.77 738,706.77 739,781.10 739,781.10
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 901,000 901,000 903,437.79 903,437.79 904,683.26 904,683.26 904,708.45 904,708.45 903,513.55 903,513.55 902,222.96 902,222.96 902,027.66 902,027.66 903,086.57 903,086.57 904,399.97 904,399.97
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,884,000 1,884,000 1,889,097.45 1,889,097.45 1,891,701.74 1,891,701.74 1,891,754.40 1,891,754.40 1,889,255.87 1,889,255.87 1,886,557.23 1,886,557.23 1,886,148.84 1,886,148.84 1,888,363.04 1,888,363.04 1,891,109.36 1,891,109.36
HARGA SATUAN DASAR UPAH KOTA MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 122,315.76
2 Tukang OH 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 137,354.58
3 Mandor OH 157,653.93 157,653.93 157,494.59 157,494.59 157,265.49 157,265.49 157,179.05 157,179.05 157,312.18 157,312.18 157,538.01 157,538.01 157,646.67 157,646.67 157,406.34 157,406.34
4 Operator OH 325,349.51 325,349.51 325,020.69 325,020.69 324,547.89 324,547.89 324,369.51 324,369.51 324,644.25 324,644.25 325,110.28 325,110.28 325,334.53 325,334.53 324,838.57 324,838.57
5 Pembantu Operator OH 203,845.53 203,845.53 203,639.51 203,639.51 203,343.28 203,343.28 203,231.51 203,231.51 203,403.65 203,403.65 203,695.64 203,695.64 203,836.14 203,836.14 203,525.40 203,525.40
6 Sopir OH 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 152,393.40
7 Pembantu Sopir OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64
8 Mekanik OH 182,758.06 182,758.06 182,573.35 182,573.35 182,307.77 182,307.77 182,207.56 182,207.56 182,361.90 182,361.90 182,623.68 182,623.68 182,749.64 182,749.64 182,471.05 182,471.05
9 Pembantu Mekanik OH 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 132,341.64
10 Kepala Tukang OH 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 152,393.40
11 Pemasak Aspal OH 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 152,393.40

HARGA SATUAN DASAR ALAT KOTA MOJOKERTO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 479,062.02 535,220.03 478,577.85 534,679.10 477,881.68 533,901.32 477,619.01 533,607.86 478,023.56 534,059.84 478,709.77 534,826.49 479,039.97 535,195.39 478,309.69 972,822.03
2 Asphalt Distribution Unit/Jam 294,963.88 379,574.43 294,665.77 379,190.81 294,237.13 378,639.21 294,075.40 378,431.09 294,324.49 378,751.63 294,746.99 379,295.33 294,950.30 379,556.95 294,500.66 648,932.33
3 Asphalt Finisher Unit/Jam 216,645.88 1,027,260.95 216,426.93 1,026,222.74 216,112.10 1,024,729.92 215,993.31 1,024,166.69 216,176.26 1,025,034.17 216,486.59 1,026,505.62 216,635.91 1,027,213.66 216,305.65 1,223,924.26
4 Asphalt Liquid Mixer Unit/Jam 77,300.88 141,587.29 77,222.75 141,444.19 77,110.42 141,238.43 77,068.04 141,160.80 77,133.31 141,280.37 77,244.04 141,483.18 77,297.32 141,580.77 77,179.48 212,111.50
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 103,745.92 104,433.18 103,641.06 104,327.63 103,490.30 104,175.87 103,433.42 104,118.61 103,521.03 104,206.80 103,669.63 104,356.39 103,741.14 104,428.37 103,582.99 199,218.51
6 Asphalt Mixing Plant Unit/Jam 1,159,513.17 5,872,398.97 1,158,341.30 5,866,463.99 1,156,656.29 5,857,930.18 1,156,020.54 5,854,710.43 1,156,999.71 5,859,669.45 1,158,660.60 5,868,081.08 1,159,459.79 5,872,128.65 1,157,692.23 6,924,375.25
7 Asphalt Sprayer Unit/Jam 95,608.98 95,608.98 95,512.35 95,512.35 95,373.41 95,373.41 95,320.99 95,320.99 95,401.73 95,401.73 95,538.68 95,538.68 95,604.58 95,604.58 95,458.83 182,961.16
8 Asphalt Tanker Unit/Jam 447,531.40 519,153.38 447,079.10 518,628.70 446,428.74 517,874.26 446,183.37 517,589.62 446,561.29 518,028.02 447,202.34 518,771.66 447,510.80 519,129.49 446,828.58 927,923.47
9 Blending Equipment Unit/Jam 145,447.70 229,953.82 145,300.71 229,721.41 145,089.34 229,387.24 145,009.59 229,261.16 145,132.42 229,455.35 145,340.76 229,784.74 145,441.01 229,943.23 145,219.29 362,707.94
10 Bore Pile Machine Unit/Jam 400,744.03 696,890.61 400,339.01 696,186.30 399,756.65 695,173.57 399,536.92 694,791.48 399,875.34 695,379.97 400,449.36 696,378.20 400,725.58 696,858.54 400,114.68 1,062,561.28
11 Bore Pile Machine Dia 60 Unit/Jam 262,416.14 793,290.47 262,150.93 792,488.72 261,769.58 791,335.91 261,625.70 790,900.96 261,847.30 791,570.86 262,223.19 792,707.17 262,404.06 793,253.95 262,004.03 1,032,210.63
12 Bore Pile Machine Dia 80 Unit/Jam 1,037,459.15 1,037,459.15 1,036,410.64 1,036,410.64 1,034,902.99 1,034,902.99 1,034,334.17 1,034,334.17 1,035,210.26 1,035,210.26 1,036,696.32 1,036,696.32 1,037,411.39 1,037,411.39 1,035,829.89 1,985,323.27
13 Bulldozer 100-150 HP Unit/Jam 406,846.73 589,444.94 406,435.54 588,849.22 405,844.31 587,992.63 405,621.24 587,669.45 405,964.81 588,167.21 406,547.58 589,011.53 406,828.00 589,417.81 406,207.80 960,869.60
14 Cement Tanker Unit/Jam 378,367.46 488,024.26 377,985.06 487,531.04 377,435.21 486,821.84 377,227.76 486,554.26 377,547.27 486,966.38 378,089.25 487,665.43 378,350.04 488,001.80 377,773.25 833,543.67
15 Cold Milling Unit/Jam 590,944.87 1,397,351.04 590,347.63 1,395,938.79 589,488.86 1,393,908.15 589,164.86 1,393,142.01 589,663.89 1,394,322.02 590,510.36 1,396,323.58 590,917.67 1,397,286.71 590,016.83 1,935,995.47
16 Cold Recycler Unit/Jam 4,976,752.58 4,976,752.58 4,971,722.78 4,971,722.78 4,964,490.54 4,964,490.54 4,961,761.86 4,961,761.86 4,965,964.53 4,965,964.53 4,973,093.24 4,973,093.24 4,976,523.48 4,976,523.48 4,968,936.92 9,523,712.51
17 Compressor 4000-6500 L\M Unit/Jam 151,550.41 153,665.38 151,397.24 153,510.08 151,177.01 153,286.77 151,093.91 153,202.52 151,221.89 153,332.29 151,438.97 153,552.40 151,543.43 153,658.31 151,312.41 292,124.57
18 Concrete Breaker Unit/Jam 552,294.43 1,052,365.08 551,736.25 1,051,301.50 550,933.65 1,049,772.19 550,630.84 1,049,195.20 551,097.23 1,050,083.88 551,888.34 1,051,591.29 552,269.01 1,052,316.64 551,427.09 1,556,178.00
19 Concrete Mixer (350) Unit/Jam 102,728.80 103,429.01 102,624.97 103,324.48 102,475.69 103,174.18 102,419.36 103,117.47 102,506.11 103,204.81 102,653.26 103,352.96 102,724.07 103,424.25 102,567.47 197,285.04
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 116,968.43 117,487.32 116,850.22 117,368.58 116,680.24 117,197.85 116,616.11 117,133.43 116,714.88 117,232.65 116,882.43 117,400.94 116,963.05 117,481.91 116,784.74 224,353.54
21 Concrete Pan Mixer Unit/Jam 311,237.75 665,761.49 310,923.19 665,088.64 310,470.90 664,121.15 310,300.25 663,756.12 310,563.08 664,318.33 311,008.90 665,271.97 311,223.42 665,730.85 310,748.97 949,563.97
22 Concrete Pump Unit/Jam 236,988.22 254,053.78 236,748.70 253,797.02 236,404.31 253,427.83 236,274.37 253,288.54 236,474.50 253,503.07 236,813.96 253,866.98 236,977.31 254,042.09 236,616.04 470,548.88
23 Concrete Vibrator Unit/Jam 88,489.16 88,489.16 88,399.73 88,399.73 88,271.14 88,271.14 88,222.62 88,222.62 88,297.35 88,297.35 88,424.10 88,424.10 88,485.09 88,485.09 88,350.20 169,336.40
24 Crane 10-15 Ton Unit/Jam 317,340.45 381,823.76 317,019.72 381,437.86 316,558.56 380,883.00 316,384.57 380,673.65 316,652.55 380,996.08 317,107.11 381,543.01 317,325.84 381,806.18 316,842.08 671,657.40
25 Crane On Track 35 Ton Unit/Jam 263,433.26 500,074.25 263,167.01 499,568.84 262,784.19 498,842.13 262,639.76 498,567.95 262,862.21 498,990.24 263,239.56 499,706.55 263,421.13 500,051.23 263,019.55 740,385.76
26 Crane On Track 75-100 Ton Unit/Jam 413,966.54 627,603.22 413,548.17 626,968.93 412,946.59 626,056.89 412,719.62 625,712.79 413,069.19 626,242.77 413,662.16 627,141.75 413,947.49 627,574.33 413,316.44 1,005,484.09
27 Dump Truck 10 Ton Unit/Jam 391,589.97 420,745.20 391,194.21 420,319.97 390,625.15 419,708.54 390,410.45 419,477.85 390,741.13 419,833.15 391,302.04 420,435.83 391,571.95 420,725.83 390,975.01 778,471.65
28 Dump Truck 3-4 M3 Unit/Jam 213,594.53 257,498.07 213,378.66 257,237.83 213,068.26 256,863.63 212,951.15 256,722.45 213,131.52 256,939.89 213,437.48 257,308.74 213,584.70 257,486.22 213,259.10 452,577.62
29 Excavator 80-140 HP Unit/Jam 309,203.51 491,036.76 308,891.01 490,540.49 308,441.68 489,826.91 308,272.14 489,557.68 308,533.26 489,972.34 308,976.16 490,675.71 309,189.28 491,014.16 308,717.93 773,251.88
30 Flat Bed Truck 3-4 M3 Unit/Jam 375,316.10 501,078.41 374,936.79 500,571.99 374,391.38 499,843.82 374,185.60 499,569.09 374,502.54 499,992.23 375,040.14 500,709.97 375,298.83 501,055.34 374,726.70 843,784.69
31 Fulvi Mixer Unit/Jam 939,815.94 1,468,089.45 938,866.10 1,466,605.71 937,500.36 1,464,472.28 936,985.07 1,463,667.35 937,778.71 1,464,907.09 939,124.90 1,467,009.99 939,772.68 1,468,021.87 938,340.02 2,325,913.21
32 Generator Set Unit/Jam 418,035.01 548,010.08 417,612.52 547,456.23 417,005.03 546,659.85 416,775.83 546,359.39 417,128.84 546,822.16 417,727.64 547,607.13 418,015.77 547,984.85 417,378.51 929,739.44
33 Hot Recycler Unit/Jam 3,070,675.66 9,004,348.91 3,067,572.26 8,995,248.59 3,063,109.94 8,982,163.42 3,061,426.33 8,977,226.47 3,064,019.40 8,984,830.29 3,068,417.84 8,997,728.14 3,070,534.31 9,003,934.42 3,065,853.37 11,800,522.41
34 Jack Hammer Unit/Jam 57,975.66 58,241.58 57,917.06 58,182.72 57,832.81 58,098.08 57,801.03 58,066.15 57,849.99 58,115.33 57,933.03 58,198.75 57,972.99 58,238.90 57,884.61 111,210.04
35 Launching Gantry Unit/Jam 73,780,636.65 73,781,034.46 73,706,069.67 73,706,467.06 73,598,851.22 73,599,248.04 73,558,398.42 73,558,795.02 73,620,703.29 73,621,100.23 73,726,386.82 73,726,784.33 73,777,240.35 73,777,638.14 73,664,769.09 141,189,970.45
36 Motor Grader > 100 HP Unit/Jam 289,878.29 525,184.40 289,585.32 524,653.62 289,164.07 523,890.42 289,005.14 523,602.47 289,249.93 524,045.96 289,665.15 524,798.24 289,864.95 525,160.22 289,423.06 789,659.25
37 Pedestrian Roller Unit/Jam 95,608.98 96,399.85 95,512.35 96,302.43 95,373.41 96,162.34 95,320.99 96,109.48 95,401.73 96,190.89 95,538.68 96,328.97 95,604.58 96,395.42 95,458.83 183,750.80
38 Pile Driver + Hammer Unit/Jam 108,831.50 318,320.35 108,721.51 317,998.64 108,563.35 317,536.05 108,503.68 317,361.52 108,595.59 317,630.33 108,751.48 318,086.30 108,826.49 318,305.70 108,660.59 417,424.17
39 Rock Drill Breaker Unit/Jam 105,780.15 343,424.48 105,673.24 343,077.40 105,519.52 342,578.33 105,461.52 342,390.04 105,550.85 342,680.04 105,702.37 343,171.97 105,775.28 343,408.67 105,614.03 439,696.25
40 Split Form Paver Unit/Jam 223,765.70 746,094.71 223,539.55 745,340.66 223,214.37 744,256.43 223,091.68 743,847.36 223,280.65 744,477.41 223,601.17 745,546.11 223,755.40 746,060.36 223,414.29 949,715.70
41 Stone Crusher Unit/Jam 599,081.80 718,577.57 598,476.34 717,851.33 597,605.75 716,807.09 597,277.28 716,413.11 597,783.18 717,019.92 598,641.31 718,049.21 599,054.23 718,544.49 598,140.99 1,265,734.97
42 Tamper Unit/Jam 89,506.28 504,090.91 89,415.82 503,581.44 89,285.75 502,848.89 89,236.67 502,572.51 89,312.26 502,998.19 89,440.47 503,720.25 89,502.16 504,067.70 89,365.72 585,216.34
43 Tandem Roller 6-8 T Unit/Jam 432,274.65 432,795.18 431,837.76 432,357.77 431,209.58 431,728.83 430,972.57 431,491.54 431,337.61 431,857.02 431,956.80 432,476.95 432,254.75 432,775.26 431,595.79 827,737.75
44 Three Wheel Roller 6-8 T Unit/Jam 143,413.47 188,775.02 143,268.53 188,584.23 143,060.12 188,309.90 142,981.49 188,206.40 143,102.60 188,365.81 143,308.02 188,636.21 143,406.87 188,766.33 143,188.25 319,732.05
45 Tire Roller 8-10 T Unit/Jam 256,313.44 316,312.02 256,054.39 315,992.34 255,681.92 315,532.67 255,541.38 315,359.24 255,757.83 315,626.36 256,124.97 316,079.44 256,301.64 316,297.46 255,910.91 550,395.99
46 Track Loader 75-100 HP Unit/Jam 240,039.57 536,224.19 239,796.97 535,682.25 239,448.14 534,903.01 239,316.53 534,609.00 239,519.24 535,061.82 239,863.07 535,829.91 240,028.52 536,199.51 239,662.60 755,068.79
47 Trailer 20 Ton Unit/Jam 387,521.51 510,115.90 387,129.85 509,600.34 386,566.71 508,859.04 386,354.23 508,579.35 386,681.48 509,010.12 387,236.57 509,740.82 387,503.67 510,092.41 386,912.93 863,978.50
48 Trailler 15 Ton Unit/Jam 335,648.55 510,592.88 335,309.32 510,076.84 334,821.56 509,334.84 334,637.53 509,054.89 334,920.97 509,486.07 335,401.75 510,217.44 335,633.10 510,569.37 335,121.44 816,980.06
49 Truck Mixer (agitator) Unit/Jam 422,103.48 422,753.53 421,676.88 422,326.27 421,063.47 421,711.92 420,832.04 421,480.13 421,188.49 421,837.13 421,793.11 422,442.68 422,084.05 422,734.07 421,440.59 808,403.11
50 Vibrating Rammer Unit/Jam 86,454.93 447,857.66 86,367.55 447,405.03 86,241.92 446,754.20 86,194.51 446,508.64 86,267.52 446,886.84 86,391.36 447,528.35 86,450.95 447,837.04 86,319.16 526,278.78
51 Vibratory Roller 5-8 T Unit/Jam 208,508.95 297,676.73 208,298.22 297,375.88 207,995.21 296,943.29 207,880.89 296,780.08 208,056.96 297,031.46 208,355.63 297,457.85 208,499.35 297,663.02 208,181.50 488,038.80
52 Water Pump 70-100 MM Unit/Jam 65,095.48 213,887.18 65,029.69 213,671.01 64,935.09 213,360.19 64,899.40 213,242.92 64,954.37 213,423.54 65,047.61 213,729.91 65,092.48 213,877.33 64,993.25 273,127.34
53 Water Tanker 3000-4500 L Unit/Jam 235,971.10 235,978.81 235,732.62 235,740.32 235,389.70 235,397.39 235,260.32 235,268.01 235,459.59 235,467.28 235,797.59 235,805.30 235,960.24 235,967.95 235,600.52 451,571.42
54 Welding Set Unit/Jam 132,225.19 366,520.28 132,091.55 366,149.85 131,899.40 365,617.22 131,826.90 365,416.27 131,938.56 365,725.78 132,127.96 366,250.78 132,219.10 366,503.41 132,017.54 486,958.55
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 229,868.40 429,965.44 229,636.08 429,530.89 229,302.04 428,906.07 229,176.00 428,670.32 229,370.12 429,033.41 229,699.38 429,649.30 229,857.82 429,945.65 229,507.41 639,668.16
HARGA SATUAN DASAR BAHAN KOTA MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 320,328.68 320,328.68 320,004.94 320,004.94 319,539.44 319,539.44 319,363.81 319,363.81 319,634.31 319,634.31 320,093.15 320,093.15 320,313.94 320,313.94 319,825.63 612,993.76
2 Agregat Pecah Mesin 20-30 mm M3 305,266.21 305,266.21 304,957.69 304,957.69 304,514.07 304,514.07 304,346.70 304,346.70 304,604.48 304,604.48 305,041.75 305,041.75 305,252.15 305,252.15 304,786.81 584,169.60
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 349,449.47 349,449.47 349,096.30 349,096.30 348,588.48 348,588.48 348,396.88 348,396.88 348,691.98 348,691.98 349,192.53 349,192.53 349,433.39 349,433.39 348,900.69 668,720.47
4 Bahan Agr. Base Kelas A M3 361,499.45 361,499.45 361,134.10 361,134.10 360,608.77 360,608.77 360,410.56 360,410.56 360,715.84 360,715.84 361,233.65 361,233.65 361,482.81 361,482.81 360,931.74 691,779.79
5 Bahan Agr. Base Kelas B M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
6 Bahan Agr. Base Kelas C M3 290,203.73 290,203.73 289,910.43 289,910.43 289,488.71 289,488.71 289,329.59 289,329.59 289,574.66 289,574.66 289,990.35 289,990.35 290,190.37 290,190.37 289,747.98 555,345.45
7 Bahan Agr. Base Kelas C2 M3 264,095.43 264,095.43 263,828.52 263,828.52 263,444.74 263,444.74 263,299.94 263,299.94 263,522.96 263,522.96 263,901.25 263,901.25 264,083.28 264,083.28 263,680.69 505,383.57
8 Bahan Agr. Base Kelas S M3 213,887.18 213,887.18 213,671.01 213,671.01 213,360.19 213,360.19 213,242.92 213,242.92 213,423.54 213,423.54 213,729.91 213,729.91 213,877.33 213,877.33 213,551.28 409,303.05
9 Bahan Pilihan M3 213,887.18 213,887.18 213,671.01 213,671.01 213,360.19 213,360.19 213,242.92 213,242.92 213,423.54 213,423.54 213,729.91 213,729.91 213,877.33 213,877.33 213,551.28 409,303.05
10 Bahan Tanah Timbunan M3 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 234,436.49
11 Batu Belah/Kerakal M3 344,428.65 344,428.65 344,080.55 344,080.55 343,580.02 343,580.02 343,391.18 343,391.18 343,682.03 343,682.03 344,175.39 344,175.39 344,412.79 344,412.79 343,887.74 659,112.42
12 Batu Kali M3 379,574.43 379,574.43 379,190.81 379,190.81 378,639.21 378,639.21 378,431.09 378,431.09 378,751.63 378,751.63 379,295.33 379,295.33 379,556.95 379,556.95 378,978.33 726,368.78
13 Chipping M3 225,937.16 225,937.16 225,708.81 225,708.81 225,380.48 225,380.48 225,256.60 225,256.60 225,447.40 225,447.40 225,771.03 225,771.03 225,926.76 225,926.76 225,582.34 432,362.37
14 Chipping (kg) Kg 323.34 323.34 323.01 323.01 322.54 322.54 322.37 322.37 322.64 322.64 323.10 323.10 323.33 323.33 322.83 618.76
15 Filler Cement Kg 2,259.37 2,259.37 2,257.09 2,257.09 2,253.80 2,253.80 2,252.57 2,252.57 2,254.47 2,254.47 2,257.71 2,257.71 2,259.27 2,259.27 2,255.82 4,323.62
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 405,682.72 405,682.72 405,272.71 405,272.71 404,683.17 404,683.17 404,460.74 404,460.74 404,803.33 404,803.33 405,384.43 405,384.43 405,664.05 405,664.05 405,045.62 776,330.66
18 Kapur M3 101,420.68 101,420.68 101,318.18 101,318.18 101,170.79 101,170.79 101,115.19 101,115.19 101,200.83 101,200.83 101,346.11 101,346.11 101,416.01 101,416.01 101,261.41 194,082.66
19 Pasir Beton (Kasar) M3 483,003.44 483,003.44 482,515.29 482,515.29 481,813.38 481,813.38 481,548.56 481,548.56 481,956.44 481,956.44 482,648.29 482,648.29 482,981.20 482,981.20 482,244.91 924,294.67
20 Pasir Halus (untuk HRS) M3 305,266.21 305,266.21 304,957.69 304,957.69 304,514.07 304,514.07 304,346.70 304,346.70 304,604.48 304,604.48 305,041.75 305,041.75 305,252.15 305,252.15 304,786.81 584,169.60
21 Pasir Pasang (Sedang) M3 341,416.15 341,416.15 341,071.10 341,071.10 340,574.95 340,574.95 340,387.76 340,387.76 340,676.07 340,676.07 341,165.11 341,165.11 341,400.44 341,400.44 340,879.98 653,347.58
22 Pasir Urug M3 207,862.19 207,862.19 207,652.11 207,652.11 207,350.04 207,350.04 207,236.07 207,236.07 207,411.61 207,411.61 207,709.35 207,709.35 207,852.62 207,852.62 207,535.75 397,773.38
23 Pasir Urug (ada unsur lempung) M3 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
24 Sirtu M3 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 71,295.73 71,295.73 71,223.67 71,223.67 71,120.06 71,120.06 71,080.97 71,080.97 71,141.18 71,141.18 71,243.30 71,243.30 71,292.44 71,292.44 71,183.76 136,434.35
26 Anti Pengelupas Liter 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
27 Arbocell Kg 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 276,711.92
28 Asbuton Curah Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,945.40 10,945.40 10,934.34 10,934.34 10,918.43 10,918.43 10,912.43 10,912.43 10,921.67 10,921.67 10,937.35 10,937.35 10,944.90 10,944.90 10,928.21 20,945.55
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
37 Assetilline Botol 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
39 Bensin Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
40 Beton B-0 M3 600,098.92 600,098.92 599,492.43 599,492.43 598,620.36 598,620.36 598,291.33 598,291.33 598,798.09 598,798.09 599,657.68 599,657.68 600,071.30 600,071.30 599,156.51 1,148,373.26
41 Beton K-125 (fc' 10 MPa) M3 620,441.26 620,441.26 619,814.20 619,814.20 618,912.57 618,912.57 618,572.40 618,572.40 619,096.33 619,096.33 619,985.06 619,985.06 620,412.70 620,412.70 619,466.90 1,187,301.17
42 Beton K-175 (fc' 15 MPa) M3 671,297.10 671,297.10 670,618.65 670,618.65 669,643.11 669,643.11 669,275.05 669,275.05 669,841.94 669,841.94 670,803.50 670,803.50 671,266.20 671,266.20 670,242.87 1,284,620.94
43 Beton K-250 (fc' 20 MPa) M3 747,580.86 747,580.86 746,825.31 746,825.31 745,738.92 745,738.92 745,329.03 745,329.03 745,960.34 745,960.34 747,031.17 747,031.17 747,546.45 747,546.45 746,406.83 1,430,600.59
44 Beton K-300 (fc' 25 MPa) M3 778,094.36 778,094.36 777,307.98 777,307.98 776,177.25 776,177.25 775,750.63 775,750.63 776,407.70 776,407.70 777,522.24 777,522.24 778,058.55 778,058.55 776,872.42 1,488,992.45
45 Beton K-350 (fc' 30 MPa) M3 808,607.87 808,607.87 807,790.64 807,790.64 806,615.57 806,615.57 806,172.22 806,172.22 806,855.06 806,855.06 808,013.31 808,013.31 808,570.65 808,570.65 807,338.00 1,547,384.31
46 Beton K-400 (fc' 35 MPa) M3 839,121.37 839,121.37 838,273.31 838,273.31 837,053.89 837,053.89 836,593.81 836,593.81 837,302.42 837,302.42 838,504.38 838,504.38 839,082.75 839,082.75 837,803.59 1,605,776.17
47 Beton K-450 (fc' 40 MPa) M3 879,806.05 879,806.05 878,916.86 878,916.86 877,638.32 877,638.32 877,155.94 877,155.94 877,898.90 877,898.90 879,159.14 879,159.14 879,765.55 879,765.55 878,424.37 1,683,631.99
48 Beton K-500 (fc' 45 MPa) M3 915,405.13 915,405.13 914,479.97 914,479.97 913,149.70 913,149.70 912,647.80 912,647.80 913,420.82 913,420.82 914,732.05 914,732.05 915,363.00 915,363.00 913,967.55 1,751,755.83
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
51 Cat Anti Karat Kg 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
52 Cat Marka (Non Thermoplas) Kg 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
53 Cat Marka (Thermoplastic) Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
54 Cerucuk Diameter 10-15 cm M' 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,327,506.33 1,327,506.33 1,326,164.67 1,326,164.67 1,324,235.53 1,324,235.53 1,323,507.68 1,323,507.68 1,324,628.71 1,324,628.71 1,326,530.23 1,326,530.23 1,327,445.22 1,327,445.22 1,325,421.57 2,540,369.14
57 Curing Compound Liter 51,212.42 51,212.42 51,160.66 51,160.66 51,086.24 51,086.24 51,058.16 51,058.16 51,101.41 51,101.41 51,174.77 51,174.77 51,210.07 51,210.07 51,132.00 98,002.14
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 620,574.06 620,574.06 619,946.88 619,946.88 619,045.05 619,045.05 618,704.80 618,704.80 619,228.85 619,228.85 620,117.76 620,117.76 620,545.50 620,545.50 619,599.49 1,187,555.31
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 721,994.74 721,994.74 721,265.05 721,265.05 720,215.85 720,215.85 719,819.99 719,819.99 720,429.68 720,429.68 721,463.87 721,463.87 721,961.51 721,961.51 720,860.90 1,381,637.98
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 915,798.62 915,798.62 914,873.06 914,873.06 913,542.21 913,542.21 913,040.10 913,040.10 913,813.45 913,813.45 915,125.24 915,125.24 915,756.46 915,756.46 914,360.42 1,752,508.81
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
64 Oxygen (Isi 6 M3) Botol 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,220,060.66 1,220,060.66 1,218,827.59 1,218,827.59 1,217,054.60 1,217,054.60 1,216,385.65 1,216,385.65 1,217,415.95 1,217,415.95 1,219,163.57 1,219,163.57 1,220,004.50 1,220,004.50 1,218,144.63 2,334,756.81
67 Seal Coat M2 99,412.35 99,412.35 99,311.88 99,311.88 99,167.41 99,167.41 99,112.91 99,112.91 99,196.86 99,196.86 99,339.25 99,339.25 99,407.77 99,407.77 99,256.23 190,239.44
68 Seal Guard Kg 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
69 Semen/PC (50 kg) Zak 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21 69,178.58 132,591.13
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
72 Solar Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
75 Baja Prategang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
77 Baja Tulangan (Polos) U25 Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
78 Baja Tulangan (Polos) U32 Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
79 Baja Tulangan (Polos) U36 Kg 10,543.73 10,543.73 10,533.08 10,533.08 10,517.76 10,517.76 10,511.97 10,511.97 10,520.88 10,520.88 10,535.98 10,535.98 10,543.25 10,543.25 10,527.18 20,176.91
80 Baja Tulangan (Ulir) D16 Kg 11,547.90 11,547.90 11,536.23 11,536.23 11,519.45 11,519.45 11,513.12 11,513.12 11,522.87 11,522.87 11,539.41 11,539.41 11,547.37 11,547.37 11,529.76 22,098.52
81 Baja Tulangan (Ulir) D19 Kg 11,547.90 11,547.90 11,536.23 11,536.23 11,519.45 11,519.45 11,513.12 11,513.12 11,522.87 11,522.87 11,539.41 11,539.41 11,547.37 11,547.37 11,529.76 22,098.52
82 Baja Tulangan (Ulir) D24 Kg 11,547.90 11,547.90 11,536.23 11,536.23 11,519.45 11,519.45 11,513.12 11,513.12 11,522.87 11,522.87 11,539.41 11,539.41 11,547.37 11,547.37 11,529.76 22,098.52
83 Baja Tulangan (Ulir) D32 Kg 11,547.90 11,547.90 11,536.23 11,536.23 11,519.45 11,519.45 11,513.12 11,513.12 11,522.87 11,522.87 11,539.41 11,539.41 11,547.37 11,547.37 11,529.76 22,098.52
84 Baja Tulangan (Ulir) D36 Kg 11,547.90 11,547.90 11,536.23 11,536.23 11,519.45 11,519.45 11,513.12 11,513.12 11,522.87 11,522.87 11,539.41 11,539.41 11,547.37 11,547.37 11,529.76 22,098.52
85 Besi Beton Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,222,846.71 13,222,846.71 13,209,482.93 13,209,482.93 13,190,267.41 13,190,267.41 13,183,017.53 13,183,017.53 13,194,183.71 13,194,183.71 13,213,124.14 13,213,124.14 13,222,238.03 13,222,238.03 13,202,081.11 25,303,767.61
87 Box Culvert Type DUB 200×200 M' 14,036,220.48 14,036,220.48 14,022,034.66 14,022,034.66 14,001,637.14 14,001,637.14 13,993,941.30 13,993,941.30 14,005,794.34 14,005,794.34 14,025,899.85 14,025,899.85 14,035,574.36 14,035,574.36 14,014,177.53 26,860,272.15
88 Box Culvert Type uk 300×200 M' 15,154,860.46 15,154,860.46 15,139,544.08 15,139,544.08 15,117,520.95 15,117,520.95 15,109,211.77 15,109,211.77 15,122,009.45 15,122,009.45 15,143,717.31 15,143,717.31 15,154,162.84 15,154,162.84 15,131,060.76 29,000,946.29
89 Casing M2 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
90 Ducting (Kabel Prestress) M' 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
91 Ducting (Strand Prestress) M' 171,712.24 171,712.24 171,538.70 171,538.70 171,289.17 171,289.17 171,195.02 171,195.02 171,340.02 171,340.02 171,585.98 171,585.98 171,704.34 171,704.34 171,442.58 328,595.40
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,213,179.99 2,213,179.99 2,210,943.22 2,210,943.22 2,207,727.02 2,207,727.02 2,206,513.57 2,206,513.57 2,208,382.51 2,208,382.51 2,211,552.67 2,211,552.67 2,213,078.11 2,213,078.11 2,209,704.34 4,235,229.63
94 Expansion Join Tipe Rubber M' 1,602,647.58 1,602,647.58 1,601,027.85 1,601,027.85 1,598,698.88 1,598,698.88 1,597,820.17 1,597,820.17 1,599,173.54 1,599,173.54 1,601,469.18 1,601,469.18 1,602,573.81 1,602,573.81 1,600,130.73 3,066,890.42
95 Expansion Join Tipe Torma M' 1,837,622.23 1,837,622.23 1,835,765.02 1,835,765.02 1,833,094.58 1,833,094.58 1,832,087.03 1,832,087.03 1,833,638.84 1,833,638.84 1,836,271.05 1,836,271.05 1,837,537.64 1,837,537.64 1,834,736.36 3,516,547.29
96 Expansion Tipe Joint Asphaltic Plug M' 2,180,042.54 2,180,042.54 2,177,839.27 2,177,839.27 2,174,671.21 2,174,671.21 2,173,475.93 2,173,475.93 2,175,316.89 2,175,316.89 2,178,439.59 2,178,439.59 2,179,942.19 2,179,942.19 2,176,618.93 4,171,816.49
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
99 Glass Bead Kg 80,333.21 80,333.21 80,252.02 80,252.02 80,135.28 80,135.28 80,091.24 80,091.24 80,159.07 80,159.07 80,274.14 80,274.14 80,329.51 80,329.51 80,207.05 153,728.84
100 Joint Sealent Kg 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
101 Joint Socket Pile 16×16×16 Set 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 176,788.17
102 Joint Socket Pile 35×35 Set 795,298.80 795,298.80 794,495.02 794,495.02 793,339.29 793,339.29 792,903.24 792,903.24 793,574.84 793,574.84 794,714.03 794,714.03 795,262.19 795,262.19 794,049.84 1,521,915.55
103 Kawat Beton Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
104 Kawat Bronjong Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
105 Kawat Las Dos 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
106 Kayu Acuan (Kelas III/Meranti) M3 4,373,139.23 4,373,139.23 4,368,719.48 4,368,719.48 4,362,364.41 4,362,364.41 4,359,966.69 4,359,966.69 4,363,659.63 4,363,659.63 4,369,923.73 4,369,923.73 4,372,937.93 4,372,937.93 4,366,271.51 8,368,613.91
107 Kayu Perancah (Gelam) M3 3,216,091.95 3,216,091.95 3,212,841.58 3,212,841.58 3,208,167.93 3,208,167.93 3,206,404.60 3,206,404.60 3,209,120.46 3,209,120.46 3,213,727.20 3,213,727.20 3,215,943.90 3,215,943.90 3,211,041.29 6,154,442.00
108 Kerb Pracetak Type 1 (Peninggi) Buah 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
110 Marmer Nama Jembatan Buah 610,532.41 610,532.41 609,915.37 609,915.37 609,028.14 609,028.14 608,693.40 608,693.40 609,208.97 609,208.97 610,083.50 610,083.50 610,504.31 610,504.31 609,573.61 1,168,339.21
111 Mata Kucing Buah 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
112 Matras Concrete (Tebal=10 cm) M2 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
113 Mini Pile 16×16×16 M' 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
114 Mini Timber Pile Buah 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
115 Multipleks 12 mm Lbr 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
116 Paku Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
117 Paving Block (Model Bata 8 cm) M2 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 67,616,464.59 67,616,464.59 67,548,127.48 67,548,127.48 67,449,866.84 67,449,866.84 67,412,793.76 67,412,793.76 67,469,893.23 67,469,893.23 67,566,747.19 67,566,747.19 67,613,352.05 67,613,352.05 67,510,277.45 129,393,567.41
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 95,789,322.07 95,789,322.07 95,692,511.82 95,692,511.82 95,553,310.23 95,553,310.23 95,500,790.40 95,500,790.40 95,581,680.75 95,581,680.75 95,718,889.56 95,718,889.56 95,784,912.65 95,784,912.65 95,638,891.33 183,306,272.76
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 183,081,398.62 183,081,398.62 182,896,365.95 182,896,365.95 182,630,311.01 182,630,311.01 182,529,930.26 182,529,930.26 182,684,535.37 182,684,535.37 182,946,781.52 182,946,781.52 183,072,970.95 183,072,970.95 182,793,881.51 350,351,877.12
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 240,081,829.24 240,081,829.24 239,839,188.63 239,839,188.63 239,490,300.34 239,490,300.34 239,358,667.11 239,358,667.11 239,561,406.87 239,561,406.87 239,905,300.55 239,905,300.55 240,070,777.70 240,070,777.70 239,704,796.76 459,430,177.89
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 306,040,417.18 306,040,417.18 305,731,114.99 305,731,114.99 305,286,375.30 305,286,375.30 305,118,577.98 305,118,577.98 305,377,017.19 305,377,017.19 305,815,390.09 305,815,390.09 306,026,329.40 306,026,329.40 305,559,801.13 585,651,166.30
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 369,237,550.94 369,237,550.94 368,864,378.06 368,864,378.06 368,327,799.94 368,327,799.94 368,125,352.59 368,125,352.59 368,437,159.32 368,437,159.32 368,966,055.92 368,966,055.92 369,220,554.05 369,220,554.05 368,657,688.01 706,587,725.72
124 Pelat Rambu (Eng. Grade) Buah 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
125 Pelat Rambu (High L Grade) Buah 242,003.80 242,003.80 241,759.22 241,759.22 241,407.54 241,407.54 241,274.85 241,274.85 241,479.21 241,479.21 241,825.86 241,825.86 241,992.66 241,992.66 241,623.75 463,108.14
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
128 Pipa Drainase Baja Dia 3" M' 280,162.08 280,162.08 279,878.93 279,878.93 279,471.80 279,471.80 279,318.19 279,318.19 279,554.77 279,554.77 279,956.08 279,956.08 280,149.18 280,149.18 279,722.10 536,129.34
129 Pipa Galvanis Dia 1,5" M' 111,462.33 111,462.33 111,349.68 111,349.68 111,187.70 111,187.70 111,126.59 111,126.59 111,220.72 111,220.72 111,380.38 111,380.38 111,457.20 111,457.20 111,287.29 213,298.77
130 Pipa Galvanis Dia 2" M' 320,328.68 320,328.68 320,004.94 320,004.94 319,539.44 319,539.44 319,363.81 319,363.81 319,634.31 319,634.31 320,093.15 320,093.15 320,313.94 320,313.94 319,825.63 612,993.76
131 Pipa Galvanis Dia 3" M' 245,016.30 245,016.30 244,768.67 244,768.67 244,412.61 244,412.61 244,278.27 244,278.27 244,485.18 244,485.18 244,836.14 244,836.14 245,005.02 245,005.02 244,631.52 468,872.97
132 Pipa Porus M' 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
133 Pipa PVC Dia 4" M' 121,503.98 121,503.98 121,381.18 121,381.18 121,204.61 121,204.61 121,138.00 121,138.00 121,240.60 121,240.60 121,414.64 121,414.64 121,498.39 121,498.39 121,313.17 232,514.88
134 Plastik Filter M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
135 Rel Pengaman M' 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,088,663.51 2,088,663.51 2,086,552.59 2,086,552.59 2,083,517.33 2,083,517.33 2,082,372.15 2,082,372.15 2,084,135.94 2,084,135.94 2,087,127.75 2,087,127.75 2,088,567.37 2,088,567.37 2,085,383.41 3,996,949.93
137 Strip Bearing Buah 320,328.68 320,328.68 320,004.94 320,004.94 319,539.44 319,539.44 319,363.81 319,363.81 319,634.31 319,634.31 320,093.15 320,093.15 320,313.94 320,313.94 319,825.63 612,993.76
138 Tiang Pancang Baja Diameter 400 M' 740,069.72 740,069.72 739,321.76 739,321.76 738,246.29 738,246.29 737,840.52 737,840.52 738,465.48 738,465.48 739,525.55 739,525.55 740,035.65 740,035.65 738,907.49 1,416,226.97
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 904,752.80 904,752.80 903,838.41 903,838.41 902,523.61 902,523.61 902,027.55 902,027.55 902,791.58 902,791.58 904,087.55 904,087.55 904,711.15 904,711.15 903,331.95 1,731,371.10
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,891,847.14 1,891,847.14 1,889,935.13 1,889,935.13 1,887,185.89 1,887,185.89 1,886,148.62 1,886,148.62 1,887,746.21 1,887,746.21 1,890,456.10 1,890,456.10 1,891,760.06 1,891,760.06 1,888,876.12 3,620,314.26
HARGA SATUAN DASAR UPAH KABUPATEN MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
2 Tukang OH 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
3 Mandor OH 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
4 Operator OH 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
5 Pembantu Operator OH 187,000 187,000 187,505.96 187,505.96 187,764.45 187,764.45 187,769.68 187,769.68 187,521.68 187,521.68 187,253.82 187,253.82 187,213.29 187,213.29 187,433.06 187,433.06 187,705.65 187,705.65
6 Sopir OH 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
7 Pembantu Sopir OH 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
8 Mekanik OH 168,000 168,000 168,454.55 168,454.55 168,686.78 168,686.78 168,691.48 168,691.48 168,468.68 168,468.68 168,228.03 168,228.03 168,191.62 168,191.62 168,389.06 168,389.06 168,633.96 168,633.96
9 Pembantu Mekanik OH 122,000 122,000 122,330.09 122,330.09 122,498.73 122,498.73 122,502.14 122,502.14 122,340.35 122,340.35 122,165.60 122,165.60 122,139.15 122,139.15 122,282.53 122,282.53 122,460.37 122,460.37
10 Kepala Tukang OH 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
11 Pemasak Aspal OH 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30

HARGA SATUAN DASAR ALAT KABUPATEN MOJOKERTO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 442,168 493,000 443,364.54 494,333.89 443,975.76 495,015.37 443,988.12 495,029.15 443,401.72 494,375.34 442,768.36 493,669.17 442,672.51 493,562.30 443,192.18 494,141.71 443,836.73 494,860.36
2 Asphalt Distribution Unit/Jam 272,248 350,000 272,984.54 350,946.98 273,360.87 351,430.79 273,368.48 351,440.57 273,007.43 350,976.41 272,617.46 350,475.07 272,558.45 350,399.20 272,878.41 350,810.54 273,275.27 351,320.74
3 Asphalt Finisher Unit/Jam 199,961 948,000 200,502.43 950,564.96 200,778.85 951,875.40 200,784.43 951,901.90 200,519.25 950,644.67 200,232.82 949,286.76 200,189.48 949,081.26 200,424.49 950,195.42 200,715.97 951,577.32
4 Asphalt Liquid Mixer Unit/Jam 71,348 130,000 71,540.77 130,351.73 71,639.40 130,531.44 71,641.39 130,535.07 71,546.77 130,362.67 71,444.58 130,176.45 71,429.11 130,148.27 71,512.96 130,301.06 71,616.97 130,490.56
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 95,756 95,756 96,015.25 96,015.25 96,147.62 96,147.62 96,150.29 96,150.29 96,023.30 96,023.30 95,886.14 95,886.14 95,865.38 95,865.38 95,977.92 95,977.92 96,117.51 96,117.51
6 Asphalt Mixing Plant Unit/Jam 1,070,216 1,490,000 1,073,111.62 1,494,031.42 1,074,591.00 1,496,091.08 1,074,620.92 1,496,132.73 1,073,201.61 1,494,156.71 1,071,668.64 1,492,022.44 1,071,436.65 1,491,699.45 1,072,694.44 1,493,450.60 1,074,254.50 1,495,622.59
7 Asphalt Sprayer Unit/Jam 88,246 88,246 88,484.64 88,484.64 88,606.63 88,606.63 88,609.09 88,609.09 88,492.06 88,492.06 88,365.66 88,365.66 88,346.53 88,346.53 88,450.24 88,450.24 88,578.88 88,578.88
8 Asphalt Tanker Unit/Jam 413,066 478,000 414,183.43 479,293.30 414,754.42 479,954.05 414,765.97 479,967.41 414,218.17 479,333.50 413,626.49 478,648.81 413,536.95 478,545.19 414,022.41 479,106.97 414,624.54 479,803.76
9 Blending Equipment Unit/Jam 134,246 212,000 134,609.62 212,573.60 134,795.19 212,866.65 134,798.94 212,872.58 134,620.90 212,591.42 134,428.61 212,287.76 134,399.51 212,241.80 134,557.28 212,490.96 134,752.98 212,799.99
10 Bore Pile Machine Unit/Jam 369,882 643,000 370,882.44 644,739.74 371,393.73 645,628.57 371,404.07 645,646.54 370,913.54 644,793.80 370,383.72 643,872.77 370,303.54 643,733.39 370,738.25 644,489.08 371,277.43 645,426.39
11 Bore Pile Machine Dia 60 Unit/Jam 242,207 732,000 242,862.10 733,980.54 243,196.91 734,992.40 243,203.68 735,012.86 242,882.47 734,042.09 242,535.53 732,993.57 242,483.03 732,834.90 242,767.69 733,695.19 243,120.76 734,762.24
12 Bore Pile Machine Dia 80 Unit/Jam 957,562 957,562 960,152.50 960,152.50 961,476.16 961,476.16 961,502.92 961,502.92 960,233.02 960,233.02 958,861.41 958,861.41 958,653.84 958,653.84 959,779.23 959,779.23 961,175.08 961,175.08
13 Bulldozer 100-150 HP Unit/Jam 375,514 544,000 376,530.39 545,471.88 377,049.47 546,223.86 377,059.97 546,239.06 376,561.97 545,517.62 376,024.08 544,738.39 375,942.68 544,620.47 376,384.01 545,259.82 376,931.40 546,052.81
14 Cement Tanker Unit/Jam 349,228 450,000 350,173.27 451,217.54 350,656.01 451,839.59 350,665.77 451,852.17 350,202.63 451,255.38 349,702.40 450,610.80 349,626.70 450,513.26 350,037.13 451,042.13 350,546.21 451,698.10
15 Cold Milling Unit/Jam 545,435 1,160,000 546,910.40 1,163,138.56 547,664.36 1,164,742.05 547,679.61 1,164,774.47 546,956.26 1,163,236.10 546,174.98 1,161,574.52 546,056.75 1,161,323.06 546,697.78 1,162,686.37 547,492.86 1,164,377.31
16 Cold Recycler Unit/Jam 4,593,480 4,593,480 4,605,908.04 4,605,908.04 4,612,257.70 4,612,257.70 4,612,386.09 4,612,386.09 4,606,294.29 4,606,294.29 4,599,714.60 4,599,714.60 4,598,718.88 4,598,718.88 4,604,117.44 4,604,117.44 4,610,813.39 4,610,813.39
17 Compressor 4000-6500 L\M Unit/Jam 139,879 139,879 140,257.57 140,257.57 140,450.93 140,450.93 140,454.84 140,454.84 140,269.33 140,269.33 140,068.97 140,068.97 140,038.65 140,038.65 140,203.04 140,203.04 140,406.95 140,406.95
18 Concrete Breaker Unit/Jam 509,761 971,000 511,140.01 973,627.19 511,844.66 974,969.42 511,858.91 974,996.56 511,182.87 973,708.84 510,452.69 972,317.98 510,342.19 972,107.50 510,941.30 973,248.68 511,684.38 974,664.11
19 Concrete Mixer (350) Unit/Jam 94,817 94,817 95,073.92 95,073.92 95,204.99 95,204.99 95,207.64 95,207.64 95,081.90 95,081.90 94,946.08 94,946.08 94,925.53 94,925.53 95,036.96 95,036.96 95,175.18 95,175.18
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 107,960 107,960 108,252.49 108,252.49 108,401.72 108,401.72 108,404.74 108,404.74 108,261.57 108,261.57 108,106.92 108,106.92 108,083.52 108,083.52 108,210.40 108,210.40 108,367.78 108,367.78
21 Concrete Pan Mixer Unit/Jam 287,269 614,000 288,045.75 615,661.27 288,442.85 616,510.01 288,450.88 616,527.18 288,069.91 615,712.90 287,658.42 614,833.41 287,596.15 614,700.31 287,933.77 615,421.93 288,352.52 616,316.96
22 Concrete Pump Unit/Jam 218,737 234,000 219,328.95 234,633.12 219,631.32 234,956.59 219,637.43 234,963.13 219,347.35 234,652.80 219,034.03 234,317.62 218,986.61 234,266.89 219,243.69 234,541.91 219,562.54 234,883.01
23 Concrete Vibrator Unit/Jam 81,674 81,674 81,895.36 81,895.36 82,008.26 82,008.26 82,010.54 82,010.54 81,902.23 81,902.23 81,785.24 81,785.24 81,767.53 81,767.53 81,863.52 81,863.52 81,982.58 81,982.58
24 Crane 10-15 Ton Unit/Jam 292,901 292,901 293,693.71 293,693.71 294,098.59 294,098.59 294,106.78 294,106.78 293,718.34 293,718.34 293,298.78 293,298.78 293,235.29 293,235.29 293,579.53 293,579.53 294,006.49 294,006.49
25 Crane On Track 35 Ton Unit/Jam 243,146 461,000 243,803.43 462,247.31 244,139.53 462,884.55 244,146.33 462,897.44 243,823.88 462,286.07 243,475.59 461,625.73 243,422.89 461,525.80 243,708.65 462,067.60 244,063.08 462,739.61
26 Crane On Track 75-100 Ton Unit/Jam 382,086 579,000 383,119.68 580,566.57 383,647.84 581,366.94 383,658.52 581,383.12 383,151.80 580,615.26 382,604.50 579,785.90 382,521.68 579,660.39 382,970.73 580,340.87 383,527.70 581,184.88
27 Dump Truck 10 Ton Unit/Jam 361,433 388,000 362,410.50 389,049.79 362,910.12 389,586.13 362,920.22 389,596.98 362,440.90 389,082.42 361,923.18 388,526.65 361,844.83 388,442.54 362,269.61 388,898.55 362,796.48 389,464.14
28 Dump Truck 3-4 M3 Unit/Jam 197,145 258,000 197,678.46 258,698.06 197,950.97 259,054.70 197,956.48 259,061.91 197,695.03 258,719.75 197,412.64 258,350.19 197,369.91 258,294.27 197,601.61 258,597.49 197,888.99 258,973.58
29 Excavator 80-140 HP Unit/Jam 285,391 453,000 286,163.10 454,225.66 286,557.60 454,851.85 286,565.58 454,864.51 286,187.10 454,263.75 285,778.30 453,614.88 285,716.44 453,516.68 286,051.85 454,049.08 286,467.87 454,709.42
30 Flat Bed Truck 3-4 M3 Unit/Jam 346,412 462,000 347,349.29 463,250.01 347,828.14 463,888.64 347,837.82 463,901.56 347,378.42 463,288.86 346,882.22 462,627.09 346,807.13 462,526.94 347,214.25 463,069.92 347,719.22 463,743.38
31 Fulvi Mixer Unit/Jam 867,438 1,354,000 869,785.21 1,357,663.45 870,984.29 1,359,535.11 871,008.53 1,359,572.96 869,858.15 1,357,777.31 868,615.63 1,355,837.84 868,427.60 1,355,544.34 869,447.07 1,357,135.65 870,711.54 1,359,109.38
32 Generator Set Unit/Jam 385,841 409,000 386,884.98 410,106.61 387,418.33 410,671.98 387,429.12 410,683.41 386,917.42 410,141.00 386,364.75 409,555.15 386,281.11 409,466.49 386,734.57 409,947.18 387,297.02 410,543.38
33 Hot Recycler Unit/Jam 2,834,195 8,311,000 2,841,863.15 8,333,486.68 2,845,780.91 8,344,975.13 2,845,860.13 8,345,207.44 2,842,101.46 8,334,185.52 2,838,041.77 8,322,280.86 2,837,427.40 8,320,479.30 2,840,758.34 8,330,246.94 2,844,889.77 8,342,361.95
34 Jack Hammer Unit/Jam 53,511 53,511 53,655.58 53,655.58 53,729.55 53,729.55 53,731.05 53,731.05 53,660.08 53,660.08 53,583.43 53,583.43 53,571.83 53,571.83 53,634.72 53,634.72 53,712.72 53,712.72
35 Launching Gantry Unit/Jam 68,098,594 68,098,594 68,282,845.62 68,282,845.62 68,376,979.56 68,376,979.56 68,378,883.01 68,378,883.01 68,288,571.72 68,288,571.72 68,191,027.43 68,191,027.43 68,176,265.81 68,176,265.81 68,256,299.84 68,256,299.84 68,355,567.69 68,355,567.69
36 Motor Grader > 100 HP Unit/Jam 267,554 449,000 268,277.91 450,214.84 268,647.75 450,835.50 268,655.23 450,848.05 268,300.40 450,252.59 267,917.16 449,609.45 267,859.16 449,512.12 268,173.61 450,039.81 268,563.62 450,694.32
37 Pedestrian Roller Unit/Jam 88,246 88,246 88,484.64 88,484.64 88,606.63 88,606.63 88,609.09 88,609.09 88,492.06 88,492.06 88,365.66 88,365.66 88,346.53 88,346.53 88,450.24 88,450.24 88,578.88 88,578.88
38 Pile Driver + Hammer Unit/Jam 100,450 293,000 100,721.88 293,792.76 100,860.73 294,197.78 100,863.54 294,205.97 100,730.33 293,817.39 100,586.44 293,397.70 100,564.67 293,334.19 100,682.72 293,678.54 100,829.15 294,105.65
39 Rock Drill Breaker Unit/Jam 97,634 317,000 97,897.90 317,857.69 98,032.86 318,295.89 98,035.59 318,304.75 97,906.11 317,884.35 97,766.26 317,430.28 97,745.10 317,361.56 97,859.84 317,734.12 98,002.16 318,196.21
40 Split Form Paver Unit/Jam 206,533 206,533 207,091.72 207,091.72 207,377.21 207,377.21 207,382.98 207,382.98 207,109.08 207,109.08 206,813.25 206,813.25 206,768.48 206,768.48 207,011.21 207,011.21 207,312.27 207,312.27
41 Stone Crusher Unit/Jam 552,945 689,000 554,441.01 690,864.20 555,205.35 691,816.61 555,220.81 691,835.87 554,487.50 690,922.13 553,695.46 689,935.21 553,575.60 689,785.85 554,225.46 690,595.61 555,031.49 691,599.97
42 Tamper Unit/Jam 82,613 82,613 82,836.69 82,836.69 82,950.88 82,950.88 82,953.19 82,953.19 82,843.63 82,843.63 82,725.30 82,725.30 82,707.39 82,707.39 82,804.48 82,804.48 82,924.91 82,924.91
43 Tandem Roller 6-8 T Unit/Jam 398,984 465,000 400,063.54 466,258.13 400,615.07 466,900.91 400,626.22 466,913.90 400,097.09 466,297.23 399,525.59 465,631.16 399,439.10 465,530.37 399,908.01 466,076.87 400,489.62 466,754.70
44 Three Wheel Roller 6-8 T Unit/Jam 132,369 167,000 132,726.96 167,451.84 132,909.94 167,682.69 132,913.64 167,687.36 132,738.09 167,465.89 132,548.49 167,226.68 132,519.80 167,190.48 132,675.36 167,386.75 132,868.32 167,630.18
45 Tire Roller 8-10 T Unit/Jam 236,574 427,000 237,214.15 428,155.31 237,541.17 428,745.56 237,547.78 428,757.50 237,234.04 428,191.22 236,895.17 427,579.58 236,843.89 427,487.02 237,121.93 427,988.86 237,466.78 428,611.30
46 Track Loader 75-100 HP Unit/Jam 221,553 291,000 222,152.93 291,787.35 222,459.19 292,189.60 222,465.38 292,197.73 222,171.56 291,811.81 221,854.21 291,394.99 221,806.18 291,331.91 222,066.57 291,673.91 222,389.53 292,098.10
47 Trailer 20 Ton Unit/Jam 357,677 494,000 358,645.20 495,336.59 359,139.62 496,019.46 359,149.62 496,033.27 358,675.28 495,378.13 358,162.94 494,670.53 358,085.41 494,563.44 358,505.77 495,144.02 359,027.16 495,864.13
48 Trailler 15 Ton Unit/Jam 309,799 471,000 310,637.58 472,274.36 311,065.82 472,925.43 311,074.48 472,938.60 310,663.62 472,313.97 310,219.87 471,639.31 310,152.71 471,537.21 310,516.81 472,090.76 310,968.41 472,777.34
49 Truck Mixer (agitator) Unit/Jam 389,596 572,000 390,650.28 573,547.63 391,188.83 574,338.32 391,199.72 574,354.31 390,683.04 573,595.73 390,124.99 572,776.40 390,040.53 572,652.41 390,498.41 573,324.66 391,066.33 574,158.47
50 Vibrating Rammer Unit/Jam 79,797 79,797 80,012.71 80,012.71 80,123.01 80,123.01 80,125.24 80,125.24 80,019.42 80,019.42 79,905.12 79,905.12 79,887.82 79,887.82 79,981.60 79,981.60 80,097.92 80,097.92
51 Vibratory Roller 5-8 T Unit/Jam 192,451 413,000 192,971.83 414,117.43 193,237.86 414,688.33 193,243.23 414,699.88 192,988.01 414,152.16 192,712.34 413,560.58 192,670.63 413,471.06 192,896.81 413,956.44 193,177.34 414,558.47
52 Water Pump 70-100 MM Unit/Jam 60,082 60,082 60,244.86 60,244.86 60,327.92 60,327.92 60,329.60 60,329.60 60,249.92 60,249.92 60,163.85 60,163.85 60,150.83 60,150.83 60,221.44 60,221.44 60,309.02 60,309.02
53 Water Tanker 3000-4500 L Unit/Jam 217,798 217,798 218,387.63 218,387.63 218,688.70 218,688.70 218,694.78 218,694.78 218,405.94 218,405.94 218,093.97 218,093.97 218,046.76 218,046.76 218,302.73 218,302.73 218,620.21 218,620.21
54 Welding Set Unit/Jam 122,042 122,042 122,372.38 122,372.38 122,541.08 122,541.08 122,544.49 122,544.49 122,382.64 122,382.64 122,207.83 122,207.83 122,181.37 122,181.37 122,324.80 122,324.80 122,502.71 122,502.71
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 212,166 337,000 212,739.67 337,911.81 213,032.95 338,377.65 213,038.88 338,387.07 212,757.51 337,940.14 212,453.61 337,457.42 212,407.62 337,384.37 212,656.97 337,780.44 212,966.24 338,271.69
HARGA SATUAN DASAR BAHAN KABUPATEN MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 295,000 295,000 295,798.17 295,798.17 296,205.95 296,205.95 296,214.20 296,214.20 295,822.97 295,822.97 295,400.42 295,400.42 295,336.47 295,336.47 295,683.17 295,683.17 296,113.20 296,113.20
2 Agregat Pecah Mesin 20-30 mm M3 281,000 281,000 281,760.29 281,760.29 282,148.72 282,148.72 282,156.57 282,156.57 281,783.92 281,783.92 281,381.41 281,381.41 281,320.50 281,320.50 281,650.75 281,650.75 282,060.37 282,060.37
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 322,000 322,000 322,871.22 322,871.22 323,316.33 323,316.33 323,325.33 323,325.33 322,898.30 322,898.30 322,437.06 322,437.06 322,367.26 322,367.26 322,745.70 322,745.70 323,215.08 323,215.08
4 Bahan Agr. Base Kelas A M3 309,000 309,000 309,836.05 309,836.05 310,263.18 310,263.18 310,271.82 310,271.82 309,862.03 309,862.03 309,419.42 309,419.42 309,352.44 309,352.44 309,715.59 309,715.59 310,166.03 310,166.03
5 Bahan Agr. Base Kelas B M3 291,000 291,000 291,787.35 291,787.35 292,189.60 292,189.60 292,197.73 292,197.73 291,811.81 291,811.81 291,394.99 291,394.99 291,331.91 291,331.91 291,673.91 291,673.91 292,098.10 292,098.10
6 Bahan Agr. Base Kelas C M3 267,000 267,000 267,722.41 267,722.41 268,091.49 268,091.49 268,098.95 268,098.95 267,744.86 267,744.86 267,362.41 267,362.41 267,304.53 267,304.53 267,618.33 267,618.33 268,007.54 268,007.54
7 Bahan Agr. Base Kelas C2 M3 244,000 244,000 244,660.18 244,660.18 244,997.47 244,997.47 245,004.29 245,004.29 244,680.70 244,680.70 244,331.19 244,331.19 244,278.30 244,278.30 244,565.06 244,565.06 244,920.75 244,920.75
8 Bahan Agr. Base Kelas S M3 197,000 197,000 197,533.01 197,533.01 197,805.33 197,805.33 197,810.84 197,810.84 197,549.58 197,549.58 197,267.40 197,267.40 197,224.69 197,224.69 197,456.22 197,456.22 197,743.39 197,743.39
9 Bahan Pilihan M3 197,000 197,000 197,533.01 197,533.01 197,805.33 197,805.33 197,810.84 197,810.84 197,549.58 197,549.58 197,267.40 197,267.40 197,224.69 197,224.69 197,456.22 197,456.22 197,743.39 197,743.39
10 Bahan Tanah Timbunan M3 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
11 Batu Belah/Kerakal M3 318,000 318,000 318,860.40 318,860.40 319,299.98 319,299.98 319,308.86 319,308.86 318,887.14 318,887.14 318,431.63 318,431.63 318,362.70 318,362.70 318,736.44 318,736.44 319,199.99 319,199.99
12 Batu Kali M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
13 Chipping M3 208,000 208,000 208,562.78 208,562.78 208,850.30 208,850.30 208,856.11 208,856.11 208,580.27 208,580.27 208,282.33 208,282.33 208,237.24 208,237.24 208,481.69 208,481.69 208,784.90 208,784.90
14 Chipping (kg) Kg 270 270 270.73 270.73 271.10 271.10 271.11 271.11 270.75 270.75 270.37 270.37 270.31 270.31 270.63 270.63 271.02 271.02
15 Filler Cement Kg 1,000 1,000 1,002.71 1,002.71 1,004.09 1,004.09 1,004.12 1,004.12 1,002.79 1,002.79 1,001.36 1,001.36 1,001.14 1,001.14 1,002.32 1,002.32 1,003.77 1,003.77
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 374,000 374,000 375,011.91 375,011.91 375,528.90 375,528.90 375,539.36 375,539.36 375,043.36 375,043.36 374,507.65 374,507.65 374,426.57 374,426.57 374,866.12 374,866.12 375,411.31 375,411.31
18 Kapur M3 93,000 93,000 93,251.63 93,251.63 93,380.18 93,380.18 93,382.78 93,382.78 93,259.45 93,259.45 93,126.23 93,126.23 93,106.07 93,106.07 93,215.37 93,215.37 93,350.94 93,350.94
19 Pasir Beton (Kasar) M3 445,000 445,000 446,204.02 446,204.02 446,819.15 446,819.15 446,831.59 446,831.59 446,241.43 446,241.43 445,604.02 445,604.02 445,507.55 445,507.55 446,030.55 446,030.55 446,679.23 446,679.23
20 Pasir Halus (untuk HRS) M3 281,000 281,000 281,760.29 281,760.29 282,148.72 282,148.72 282,156.57 282,156.57 281,783.92 281,783.92 281,381.41 281,381.41 281,320.50 281,320.50 281,650.75 281,650.75 282,060.37 282,060.37
21 Pasir Pasang (Sedang) M3 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28 315,729.49 315,729.49 316,188.67 316,188.67
22 Pasir Urug M3 191,000 191,000 191,516.78 191,516.78 191,780.80 191,780.80 191,786.14 191,786.14 191,532.84 191,532.84 191,259.25 191,259.25 191,217.85 191,217.85 191,442.33 191,442.33 191,720.75 191,720.75
23 Pasir Urug (ada unsur lempung) M3 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
24 Sirtu M3 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
26 Anti Pengelupas Liter 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
27 Arbocell Kg 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
38 Bahan Pengawet: Kreosot Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
39 Bensin Liter 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
40 Beton B-0 M3 553,000 650,000 554,496.23 651,758.67 555,260.65 652,657.18 555,276.11 652,675.35 554,542.73 651,813.33 553,750.61 650,882.27 553,630.74 650,741.37 554,280.66 651,505.30 555,086.77 652,452.81
41 Beton K-125 (fc' 10 MPa) M3 572,000 681,000 573,547.63 682,842.55 574,338.32 683,783.91 574,354.31 683,802.94 573,595.73 682,899.81 572,776.40 681,924.35 572,652.41 681,776.73 573,324.66 682,577.09 574,158.47 683,569.79
42 Beton K-175 (fc' 15 MPa) M3 619,000 707,000 620,674.80 708,912.90 621,530.45 709,890.20 621,547.76 709,909.96 620,726.85 708,972.35 619,840.19 707,959.64 619,706.01 707,806.38 620,433.50 708,637.30 621,335.83 709,667.90
43 Beton K-250 (fc' 20 MPa) M3 690,000 738,000 691,866.90 739,996.77 692,820.70 741,016.92 692,839.99 741,037.55 691,924.92 740,058.83 690,936.57 739,001.72 690,786.99 738,841.74 691,597.93 739,709.09 692,603.75 740,784.88
44 Beton K-300 (fc' 25 MPa) M3 718,000 764,000 719,942.66 766,067.12 720,935.16 767,123.21 720,955.23 767,144.57 720,003.03 766,131.36 718,974.57 765,037.01 718,818.93 764,871.40 719,662.77 765,769.30 720,709.41 766,882.99
45 Beton K-350 (fc' 30 MPa) M3 746,000 789,000 748,018.42 791,134.76 749,049.63 792,225.41 749,070.48 792,247.46 748,081.15 791,201.10 747,012.58 790,070.94 746,850.87 789,899.91 747,727.62 790,827.20 748,815.07 791,977.33
46 Beton K-400 (fc' 35 MPa) M3 774,000 815,000 776,094.18 817,205.11 777,164.09 818,331.70 777,185.72 818,354.48 776,159.26 817,273.64 775,050.58 816,106.23 774,882.80 815,929.57 775,792.46 816,887.41 776,920.73 818,075.44
47 Beton K-450 (fc' 40 MPa) M3 812,000 812,000 814,196.99 814,196.99 815,319.43 815,319.43 815,342.13 815,342.13 814,265.27 814,265.27 813,102.16 813,102.16 812,926.14 812,926.14 813,880.46 813,880.46 815,064.12 815,064.12
48 Beton K-500 (fc' 45 MPa) M3 844,000 844,000 846,283.57 846,283.57 847,450.25 847,450.25 847,473.84 847,473.84 846,354.54 846,354.54 845,145.60 845,145.60 844,962.64 844,962.64 845,954.57 845,954.57 847,184.87 847,184.87
49 Bunker Oil Liter 3,000 3,000 3,008.12 3,008.12 3,012.26 3,012.26 3,012.35 3,012.35 3,008.37 3,008.37 3,004.07 3,004.07 3,003.42 3,003.42 3,006.95 3,006.95 3,011.32 3,011.32
50 Cat Kg 61,000 61,000 61,165.04 61,165.04 61,249.37 61,249.37 61,251.07 61,251.07 61,170.17 61,170.17 61,082.80 61,082.80 61,069.57 61,069.57 61,141.27 61,141.27 61,230.19 61,230.19
51 Cat Anti Karat Kg 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
52 Cat Marka (Non Thermoplas) Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
53 Cat Marka (Thermoplastic) Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
54 Cerucuk Diameter 10-15 cm M' 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,225,000 1,225,000 1,228,314.43 1,228,314.43 1,230,007.77 1,230,007.77 1,230,042.01 1,230,042.01 1,228,417.43 1,228,417.43 1,226,662.74 1,226,662.74 1,226,397.20 1,226,397.20 1,227,836.90 1,227,836.90 1,229,622.60 1,229,622.60
57 Curing Compound Liter 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 572,000 572,000 573,547.63 573,547.63 574,338.32 574,338.32 574,354.31 574,354.31 573,595.73 573,595.73 572,776.40 572,776.40 572,652.41 572,652.41 573,324.66 573,324.66 574,158.47 574,158.47
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 666,000 666,000 667,801.97 667,801.97 668,722.59 668,722.59 668,741.20 668,741.20 667,857.97 667,857.97 666,903.99 666,903.99 666,759.62 666,759.62 667,542.35 667,542.35 668,513.18 668,513.18
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 844,000 844,000 846,283.57 846,283.57 847,450.25 847,450.25 847,473.84 847,473.84 846,354.54 846,354.54 845,145.60 845,145.60 844,962.64 844,962.64 845,954.57 845,954.57 847,184.87 847,184.87
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
64 Oxygen (Isi 6 M3) Botol 161,000 161,000 161,435.61 161,435.61 161,658.16 161,658.16 161,662.66 161,662.66 161,449.15 161,449.15 161,218.53 161,218.53 161,183.63 161,183.63 161,372.85 161,372.85 161,607.54 161,607.54
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,295,000 1,295,000 1,298,503.82 1,298,503.82 1,300,293.92 1,300,293.92 1,300,330.12 1,300,330.12 1,298,612.71 1,298,612.71 1,296,757.76 1,296,757.76 1,296,477.04 1,296,477.04 1,297,999.01 1,297,999.01 1,299,886.74 1,299,886.74
67 Seal Coat M2 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
68 Seal Guard Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
69 Semen/PC (50 kg) Zak 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
70 Semen/PC (kg) Kg 1,000 1,000 1,002.71 1,002.71 1,004.09 1,004.09 1,004.12 1,004.12 1,002.79 1,002.79 1,001.36 1,001.36 1,001.14 1,001.14 1,002.32 1,002.32 1,003.77 1,003.77
71 Slurry Seal Ton 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
83 Baja Tulangan (Ulir) D32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
84 Baja Tulangan (Ulir) D36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
85 Besi Beton Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,204,000 12,204,000 12,237,019.79 12,237,019.79 12,253,889.61 12,253,889.61 12,254,230.73 12,254,230.73 12,238,045.97 12,238,045.97 12,220,564.99 12,220,564.99 12,217,919.55 12,217,919.55 12,232,262.50 12,232,262.50 12,250,052.37 12,250,052.37
87 Box Culvert Type DUB 200×200 M' 12,955,000 12,955,000 12,990,051.74 12,990,051.74 13,007,959.67 13,007,959.67 13,008,321.78 13,008,321.78 12,991,141.07 12,991,141.07 12,972,584.35 12,972,584.35 12,969,776.12 12,969,776.12 12,985,001.70 12,985,001.70 13,003,886.30 13,003,886.30
88 Box Culvert Type uk 300×200 M' 13,987,000 13,987,000 14,024,843.97 14,024,843.97 14,044,178.46 14,044,178.46 14,044,569.42 14,044,569.42 14,026,020.08 14,026,020.08 14,005,985.12 14,005,985.12 14,002,953.19 14,002,953.19 14,019,391.65 14,019,391.65 14,039,780.60 14,039,780.60
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 181,000 181,000 181,489.72 181,489.72 181,739.92 181,739.92 181,744.98 181,744.98 181,504.94 181,504.94 181,245.68 181,245.68 181,206.44 181,206.44 181,419.17 181,419.17 181,683.01 181,683.01
91 Ducting (Strand Prestress) M' 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,042,000 2,042,000 2,047,524.94 2,047,524.94 2,050,347.64 2,050,347.64 2,050,404.71 2,050,404.71 2,047,696.65 2,047,696.65 2,044,771.69 2,044,771.69 2,044,329.05 2,044,329.05 2,046,728.94 2,046,728.94 2,049,705.58 2,049,705.58
94 Expansion Join Tipe Rubber M' 1,478,000 1,478,000 1,481,998.96 1,481,998.96 1,484,042.02 1,484,042.02 1,484,083.33 1,484,083.33 1,482,123.23 1,482,123.23 1,480,006.15 1,480,006.15 1,479,685.77 1,479,685.77 1,481,422.81 1,481,422.81 1,483,577.30 1,483,577.30
95 Expansion Join Tipe Torma M' 1,696,000 1,696,000 1,700,588.79 1,700,588.79 1,702,933.20 1,702,933.20 1,702,980.61 1,702,980.61 1,700,731.40 1,700,731.40 1,698,302.05 1,698,302.05 1,697,934.41 1,697,934.41 1,699,927.66 1,699,927.66 1,702,399.94 1,702,399.94
96 Expansion Tipe Joint Asphaltic Plug M' 2,012,000 2,012,000 2,017,443.77 2,017,443.77 2,020,225.00 2,020,225.00 2,020,281.24 2,020,281.24 2,017,612.95 2,017,612.95 2,014,730.97 2,014,730.97 2,014,294.83 2,014,294.83 2,016,659.47 2,016,659.47 2,019,592.38 2,019,592.38
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
99 Glass Bead Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
100 Joint Sealent Kg 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
101 Joint Socket Pile 16×16×16 Set 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
102 Joint Socket Pile 35×35 Set 734,000 734,000 735,985.95 735,985.95 737,000.57 737,000.57 737,021.09 737,021.09 736,047.67 736,047.67 734,996.29 734,996.29 734,837.18 734,837.18 735,699.83 735,699.83 736,769.78 736,769.78
103 Kawat Beton Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
104 Kawat Bronjong Kg 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
105 Kawat Las Dos 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
106 Kayu Acuan (Kelas III/Meranti) M3 4,036,000 4,036,000 4,046,920.02 4,046,920.02 4,052,499.05 4,052,499.05 4,052,611.87 4,052,611.87 4,047,259.39 4,047,259.39 4,041,478.23 4,041,478.23 4,040,603.35 4,040,603.35 4,045,346.73 4,045,346.73 4,051,230.04 4,051,230.04
107 Kayu Perancah (Gelam) M3 2,600,000 2,600,000 2,607,034.70 2,607,034.70 2,610,628.73 2,610,628.73 2,610,701.40 2,610,701.40 2,607,253.32 2,607,253.32 2,603,529.09 2,603,529.09 2,602,965.49 2,602,965.49 2,606,021.18 2,606,021.18 2,609,811.22 2,609,811.22
108 Kerb Pracetak Type 1 (Peninggi) Buah 51,000 51,000 51,137.99 51,137.99 51,208.49 51,208.49 51,209.91 51,209.91 51,142.28 51,142.28 51,069.22 51,069.22 51,058.17 51,058.17 51,118.11 51,118.11 51,192.45 51,192.45
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
110 Marmer Nama Jembatan Buah 563,000 563,000 564,523.28 564,523.28 565,301.53 565,301.53 565,317.26 565,317.26 564,570.62 564,570.62 563,764.18 563,764.18 563,642.14 563,642.14 564,303.82 564,303.82 565,124.51 565,124.51
111 Mata Kucing Buah 147,000 147,000 147,397.73 147,397.73 147,600.93 147,600.93 147,605.04 147,605.04 147,410.09 147,410.09 147,199.53 147,199.53 147,167.66 147,167.66 147,340.43 147,340.43 147,554.71 147,554.71
112 Matras Concrete (Tebal=10 cm) M2 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
113 Mini Pile 16×16×16 M' 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
114 Mini Timber Pile Buah 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
115 Multipleks 12 mm Lbr 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
116 Paku Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
117 Paving Block (Model Bata 8 cm) M2 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 62,408,000 62,408,000 62,576,854.41 62,576,854.41 62,663,122.14 62,663,122.14 62,664,866.53 62,664,866.53 62,582,102.01 62,582,102.01 62,492,708.92 62,492,708.92 62,479,180.84 62,479,180.84 62,552,526.91 62,552,526.91 62,643,499.53 62,643,499.53
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 88,412,000 88,412,000 88,651,212.22 88,651,212.22 88,773,425.76 88,773,425.76 88,775,896.99 88,775,896.99 88,658,646.38 88,658,646.38 88,532,005.21 88,532,005.21 88,512,840.29 88,512,840.29 88,616,748.00 88,616,748.00 88,745,626.85 88,745,626.85
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 168,981,000 168,981,000 169,438,204.00 169,438,204.00 169,671,789.55 169,671,789.55 169,676,512.79 169,676,512.79 169,452,412.84 169,452,412.84 169,210,364.79 169,210,364.79 169,173,735.07 169,173,735.07 169,372,332.86 169,372,332.86 169,618,657.78 169,618,657.78
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 221,592,000 221,592,000 222,191,551.12 222,191,551.12 222,497,861.84 222,497,861.84 222,504,055.62 222,504,055.62 222,210,183.78 222,210,183.78 221,892,775.84 221,892,775.84 221,844,741.73 221,844,741.73 222,105,171.49 222,105,171.49 222,428,187.87 222,428,187.87
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 282,471,000 282,471,000 283,235,268.59 283,235,268.59 283,625,733.47 283,625,733.47 283,633,628.90 283,633,628.90 283,259,020.29 283,259,020.29 282,854,409.39 282,854,409.39 282,793,178.64 282,793,178.64 283,125,157.48 283,125,157.48 283,536,917.65 283,536,917.65
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 340,801,000 340,801,000 341,723,089.35 341,723,089.35 342,194,184.86 342,194,184.86 342,203,710.70 342,203,710.70 341,751,745.75 341,751,745.75 341,263,583.07 341,263,583.07 341,189,708.23 341,189,708.23 341,590,240.39 341,590,240.39 342,087,028.66 342,087,028.66
124 Pelat Rambu (Eng. Grade) Buah 197,000 197,000 197,533.01 197,533.01 197,805.33 197,805.33 197,810.84 197,810.84 197,549.58 197,549.58 197,267.40 197,267.40 197,224.69 197,224.69 197,456.22 197,456.22 197,743.39 197,743.39
125 Pelat Rambu (High L Grade) Buah 230,000 230,000 230,622.30 230,622.30 230,940.23 230,940.23 230,946.66 230,946.66 230,641.64 230,641.64 230,312.19 230,312.19 230,262.33 230,262.33 230,532.64 230,532.64 230,867.92 230,867.92
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 258,000 258,000 258,698.06 258,698.06 259,054.70 259,054.70 259,061.91 259,061.91 258,719.75 258,719.75 258,350.19 258,350.19 258,294.27 258,294.27 258,597.49 258,597.49 258,973.58 258,973.58
129 Pipa Galvanis Dia 1,5" M' 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
130 Pipa Galvanis Dia 2" M' 295,000 295,000 295,798.17 295,798.17 296,205.95 296,205.95 296,214.20 296,214.20 295,822.97 295,822.97 295,400.42 295,400.42 295,336.47 295,336.47 295,683.17 295,683.17 296,113.20 296,113.20
131 Pipa Galvanis Dia 3" M' 226,000 226,000 226,611.48 226,611.48 226,923.88 226,923.88 226,930.20 226,930.20 226,630.48 226,630.48 226,306.76 226,306.76 226,257.77 226,257.77 226,523.38 226,523.38 226,852.82 226,852.82
132 Pipa Porus M' 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
133 Pipa PVC Dia 4" M' 111,000 111,000 111,300.33 111,300.33 111,453.76 111,453.76 111,456.87 111,456.87 111,309.66 111,309.66 111,150.66 111,150.66 111,126.60 111,126.60 111,257.06 111,257.06 111,418.86 111,418.86
134 Plastik Filter M2 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
135 Rel Pengaman M' 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,928,000 1,928,000 1,933,216.50 1,933,216.50 1,935,881.61 1,935,881.61 1,935,935.50 1,935,935.50 1,933,378.62 1,933,378.62 1,930,616.95 1,930,616.95 1,930,199.02 1,930,199.02 1,932,464.94 1,932,464.94 1,935,275.40 1,935,275.40
137 Strip Bearing Buah 295,000 295,000 295,798.17 295,798.17 296,205.95 296,205.95 296,214.20 296,214.20 295,822.97 295,822.97 295,400.42 295,400.42 295,336.47 295,336.47 295,683.17 295,683.17 296,113.20 296,113.20
138 Tiang Pancang Baja Diameter 400 M' 683,000 683,000 684,847.96 684,847.96 685,792.08 685,792.08 685,811.18 685,811.18 684,905.39 684,905.39 683,927.06 683,927.06 683,779.01 683,779.01 684,581.72 684,581.72 685,577.33 685,577.33
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 834,000 834,000 836,256.51 836,256.51 837,409.37 837,409.37 837,432.68 837,432.68 836,326.64 836,326.64 835,132.02 835,132.02 834,951.24 834,951.24 835,931.41 835,931.41 837,147.14 837,147.14
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,746,000 1,746,000 1,750,724.07 1,750,724.07 1,753,137.60 1,753,137.60 1,753,186.40 1,753,186.40 1,750,870.88 1,750,870.88 1,748,369.92 1,748,369.92 1,747,991.44 1,747,991.44 1,750,043.46 1,750,043.46 1,752,588.61 1,752,588.61
HARGA SATUAN DASAR UPAH KABUPATEN MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 112,289.88
2 Tukang OH 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 126,326.11
3 Mandor OH 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 145,375.29
4 Operator OH 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 300,776.45
5 Pembantu Operator OH 187,778.88 187,778.88 187,589.10 187,589.10 187,316.22 187,316.22 187,213.27 187,213.27 187,371.84 187,371.84 187,640.81 187,640.81 187,770.24 187,770.24 187,483.99 187,483.99
6 Sopir OH 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 140,362.34
7 Pembantu Sopir OH 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 122,315.76
8 Mekanik OH 168,699.75 168,699.75 168,529.25 168,529.25 168,284.09 168,284.09 168,191.60 168,191.60 168,334.06 168,334.06 168,575.70 168,575.70 168,691.98 168,691.98 168,434.81 168,434.81
9 Pembantu Mekanik OH 122,508.15 122,508.15 122,384.33 122,384.33 122,206.31 122,206.31 122,139.14 122,139.14 122,242.59 122,242.59 122,418.07 122,418.07 122,502.51 122,502.51 122,315.76 122,315.76
10 Kepala Tukang OH 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 140,362.34
11 Pemasak Aspal OH 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 140,362.34

HARGA SATUAN DASAR ALAT KABUPATEN MOJOKERTO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 444,009.88 495,053.42 443,561.14 494,553.09 442,915.90 493,833.68 442,672.46 493,562.24 443,047.41 493,980.30 443,683.41 494,689.41 443,989.44 495,030.63 443,312.59 900,638.42
2 Asphalt Distribution Unit/Jam 273,381.88 351,457.80 273,105.59 351,102.60 272,708.31 350,591.86 272,558.41 350,399.16 272,789.27 350,695.95 273,180.87 351,199.38 273,369.30 351,441.62 272,952.55 601,107.80
3 Asphalt Finisher Unit/Jam 200,794.28 951,948.56 200,591.34 950,986.47 200,299.55 949,603.09 200,189.46 949,081.15 200,359.02 949,885.04 200,646.64 951,248.61 200,785.03 951,904.74 200,478.94 1,134,222.60
4 Asphalt Liquid Mixer Unit/Jam 71,644.91 130,541.47 71,572.50 130,409.54 71,468.38 130,219.83 71,429.10 130,148.26 71,489.60 130,258.50 71,592.23 130,445.48 71,641.61 130,535.46 71,532.39 195,906.62
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 96,155.01 96,155.01 96,057.83 96,057.83 95,918.09 95,918.09 95,865.37 95,865.37 95,946.57 95,946.57 96,084.30 96,084.30 96,150.58 96,150.58 96,004.00 184,006.06
6 Asphalt Mixing Plant Unit/Jam 1,074,673.60 1,496,206.07 1,073,587.47 1,494,693.92 1,072,025.75 1,492,519.63 1,071,436.52 1,491,699.28 1,072,344.04 1,492,962.77 1,073,883.41 1,495,105.94 1,074,624.13 1,496,137.20 1,072,985.90 2,477,408.81
7 Asphalt Sprayer Unit/Jam 88,613.44 88,613.44 88,523.88 88,523.88 88,395.11 88,395.11 88,346.52 88,346.52 88,421.35 88,421.35 88,548.28 88,548.28 88,609.36 88,609.36 88,474.28 169,574.21
8 Asphalt Tanker Unit/Jam 414,786.30 479,990.94 414,367.09 479,505.84 413,764.32 478,808.31 413,536.90 478,545.14 413,887.17 478,950.47 414,481.32 479,638.01 414,767.21 479,968.85 414,134.91 858,853.88
9 Blending Equipment Unit/Jam 134,805.55 212,883.01 134,669.31 212,667.86 134,473.41 212,358.50 134,399.49 212,241.78 134,513.33 212,421.55 134,706.43 212,726.48 134,799.34 212,873.21 134,593.84 335,924.13
10 Bore Pile Machine Unit/Jam 371,422.28 645,678.19 371,046.90 645,025.63 370,507.15 644,087.33 370,303.50 643,733.31 370,617.15 644,278.56 371,149.18 645,203.43 371,405.18 645,648.47 370,838.99 984,593.72
11 Bore Pile Machine Dia 60 Unit/Jam 243,215.60 735,048.89 242,969.80 734,306.01 242,616.35 733,237.83 242,483.00 732,834.81 242,688.39 733,455.53 243,036.77 734,508.42 243,204.41 735,015.05 242,833.65 956,487.99
12 Bore Pile Machine Dia 80 Unit/Jam 961,550.06 961,550.06 960,578.27 960,578.27 959,180.94 959,180.94 958,653.73 958,653.73 959,465.72 959,465.72 960,843.05 960,843.05 961,505.80 961,505.80 960,040.01 1,840,060.61
13 Bulldozer 100-150 HP Unit/Jam 377,078.46 546,265.84 376,697.36 545,713.75 376,149.39 544,919.92 375,942.64 544,620.41 376,261.07 545,081.71 376,801.20 545,864.18 377,061.10 546,240.70 376,486.28 890,514.08
14 Cement Tanker Unit/Jam 350,682.96 451,874.32 350,328.54 451,417.63 349,818.93 450,760.96 349,626.66 450,513.21 349,922.79 450,894.80 350,425.11 451,542.06 350,666.82 451,853.52 350,132.24 772,113.37
15 Cold Milling Unit/Jam 547,706.46 1,164,831.57 547,152.91 1,163,654.33 546,356.98 1,161,961.59 546,056.68 1,161,322.93 546,519.20 1,162,306.58 547,303.74 1,163,975.09 547,681.25 1,164,777.95 546,846.32 1,664,268.92
16 Cold Recycler Unit/Jam 4,612,612.22 4,612,612.22 4,607,950.44 4,607,950.44 4,601,247.37 4,601,247.37 4,598,718.34 4,598,718.34 4,602,613.51 4,602,613.51 4,609,220.63 4,609,220.63 4,612,399.89 4,612,399.89 4,605,368.42 8,826,878.98
17 Compressor 4000-6500 L\M Unit/Jam 140,461.72 140,461.72 140,319.77 140,319.77 140,115.65 140,115.65 140,038.63 140,038.63 140,157.25 140,157.25 140,358.45 140,358.45 140,455.26 140,455.26 140,241.14 268,793.17
18 Concrete Breaker Unit/Jam 511,884.00 975,044.36 511,366.66 974,058.93 510,622.79 972,641.99 510,342.13 972,107.38 510,774.40 972,930.77 511,507.62 974,327.43 511,860.44 974,999.48 511,080.12 1,441,994.67
19 Concrete Mixer (350) Unit/Jam 95,212.31 95,212.31 95,116.08 95,116.08 94,977.72 94,977.72 94,925.52 94,925.52 95,005.92 95,005.92 95,142.30 95,142.30 95,207.93 95,207.93 95,062.79 182,202.08
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 108,410.06 108,410.06 108,300.49 108,300.49 108,142.95 108,142.95 108,083.51 108,083.51 108,175.06 108,175.06 108,330.34 108,330.34 108,405.07 108,405.07 108,239.81 207,457.81
21 Concrete Pan Mixer Unit/Jam 288,465.02 616,557.40 288,173.48 615,934.27 287,754.28 615,038.29 287,596.12 614,700.24 287,839.72 615,220.90 288,252.91 616,104.06 288,451.74 616,529.02 288,012.00 879,595.32
22 Concrete Pump Unit/Jam 219,648.20 234,974.65 219,426.21 234,737.17 219,107.02 234,395.70 218,986.59 234,266.87 219,172.07 234,465.29 219,486.70 234,801.87 219,638.09 234,963.83 219,303.26 435,629.95
23 Concrete Vibrator Unit/Jam 82,014.56 82,014.56 81,931.68 81,931.68 81,812.49 81,812.49 81,767.52 81,767.52 81,836.78 81,836.78 81,954.26 81,954.26 82,010.79 82,010.79 81,885.77 156,946.35
24 Crane 10-15 Ton Unit/Jam 294,121.20 294,121.20 293,823.94 293,823.94 293,396.52 293,396.52 293,235.26 293,235.26 293,483.63 293,483.63 293,904.93 293,904.93 294,107.66 294,107.66 293,659.30 562,842.07
25 Crane On Track 35 Ton Unit/Jam 244,158.30 462,920.13 243,911.54 462,452.28 243,556.73 461,779.56 243,422.86 461,525.75 243,629.04 461,916.67 243,978.77 462,579.76 244,147.06 462,898.83 243,774.87 685,649.36
26 Crane On Track 75-100 Ton Unit/Jam 383,677.33 581,411.62 383,289.56 580,824.01 382,732.00 579,979.10 382,521.64 579,660.32 382,845.64 580,151.30 383,395.22 580,984.12 383,659.67 581,384.86 383,074.79 931,644.03
27 Dump Truck 10 Ton Unit/Jam 362,938.01 389,616.08 362,571.21 389,222.31 362,043.78 388,656.12 361,844.79 388,442.50 362,151.28 388,771.51 362,671.15 389,329.60 362,921.31 389,598.14 362,368.04 721,168.85
28 Dump Truck 3-4 M3 Unit/Jam 197,966.19 259,074.61 197,766.11 258,812.77 197,478.43 258,436.28 197,369.89 258,294.24 197,537.06 258,513.02 197,820.63 258,884.12 197,957.08 259,062.68 197,655.30 439,848.46
29 Excavator 80-140 HP Unit/Jam 286,579.63 454,886.81 286,289.99 454,427.08 285,873.53 453,766.03 285,716.41 453,516.63 285,958.41 453,900.76 286,368.91 454,552.34 286,566.43 454,865.87 286,129.57 716,453.09
30 Flat Bed Truck 3-4 M3 Unit/Jam 347,854.88 463,924.30 347,503.31 463,455.43 346,997.81 462,781.25 346,807.09 462,526.89 347,100.84 462,918.66 347,599.10 463,583.18 347,838.86 463,902.94 347,308.59 781,556.13
31 Fulvi Mixer Unit/Jam 871,051.23 1,359,639.61 870,170.90 1,358,265.48 868,905.08 1,356,289.65 868,427.50 1,355,544.18 869,163.07 1,356,692.34 870,410.76 1,358,639.89 871,011.14 1,359,577.03 869,683.31 2,154,699.52
32 Generator Set Unit/Jam 387,448.11 410,703.55 387,056.54 410,288.47 386,493.49 409,691.63 386,281.06 409,466.45 386,608.25 409,813.27 387,163.23 410,401.56 387,430.28 410,684.64 386,839.65 764,655.10
33 Hot Recycler Unit/Jam 2,845,999.65 8,345,616.57 2,843,123.32 8,337,182.00 2,838,987.49 8,325,054.11 2,837,427.07 8,320,478.33 2,839,830.41 8,327,525.88 2,843,907.03 8,339,480.16 2,845,868.64 8,345,232.40 2,841,530.20 10,937,198.74
34 Jack Hammer Unit/Jam 53,733.68 53,733.68 53,679.37 53,679.37 53,601.29 53,601.29 53,571.83 53,571.83 53,617.20 53,617.20 53,694.17 53,694.17 53,731.21 53,731.21 53,649.29 102,826.92
35 Launching Gantry Unit/Jam 68,382,235.35 68,382,235.35 68,313,124.29 68,313,124.29 68,213,750.84 68,213,750.84 68,176,257.90 68,176,257.90 68,234,004.03 68,234,004.03 68,331,954.88 68,331,954.88 68,379,087.55 68,379,087.55 68,274,845.61 130,858,976.91
36 Motor Grader > 100 HP Unit/Jam 268,668.40 450,870.15 268,396.87 450,414.48 268,006.44 449,759.27 267,859.13 449,512.06 268,086.01 449,892.81 268,470.85 450,538.63 268,656.03 450,849.40 268,246.47 696,050.20
37 Pedestrian Roller Unit/Jam 88,613.44 88,613.44 88,523.88 88,523.88 88,395.11 88,395.11 88,346.52 88,346.52 88,421.35 88,421.35 88,548.28 88,548.28 88,609.36 88,609.36 88,474.28 169,574.21
38 Pile Driver + Hammer Unit/Jam 100,868.49 294,220.39 100,766.54 293,923.03 100,619.96 293,495.47 100,564.66 293,334.15 100,649.84 293,582.61 100,794.32 294,004.05 100,863.84 294,206.85 100,710.08 386,074.22
39 Rock Drill Breaker Unit/Jam 98,040.40 318,320.35 97,941.31 317,998.64 97,798.84 317,536.05 97,745.09 317,361.52 97,827.88 317,630.33 97,968.31 318,086.30 98,035.89 318,305.70 97,886.43 407,548.04
40 Split Form Paver Unit/Jam 207,393.15 207,393.15 207,183.55 207,183.55 206,882.16 206,882.16 206,768.45 206,768.45 206,943.59 206,943.59 207,240.66 207,240.66 207,383.60 207,383.60 207,067.45 396,875.82
41 Stone Crusher Unit/Jam 555,248.03 691,869.79 554,686.86 691,170.55 553,879.97 690,165.12 553,575.54 689,785.77 554,044.42 690,370.03 554,839.76 691,361.07 555,222.47 691,837.94 554,376.05 1,198,952.01
42 Tamper Unit/Jam 82,957.26 82,957.26 82,873.42 82,873.42 82,752.86 82,752.86 82,707.38 82,707.38 82,777.43 82,777.43 82,896.26 82,896.26 82,953.44 82,953.44 82,826.98 158,750.33
43 Tandem Roller 6-8 T Unit/Jam 400,645.86 466,936.80 400,240.94 466,464.88 399,658.72 465,786.33 399,439.05 465,530.31 399,777.38 465,924.62 400,351.27 466,593.46 400,627.42 466,915.30 400,016.67 832,878.75
44 Three Wheel Roller 6-8 T Unit/Jam 132,920.16 167,695.58 132,785.82 167,526.10 132,592.66 167,282.40 132,519.78 167,190.46 132,632.03 167,332.07 132,822.42 167,572.28 132,914.04 167,687.86 132,711.41 289,082.13
45 Tire Roller 8-10 T Unit/Jam 237,559.43 428,778.52 237,319.34 428,345.17 236,974.11 427,722.07 236,843.86 427,486.97 237,044.47 427,849.06 237,384.75 428,463.24 237,548.49 428,758.78 237,186.36 645,522.00
46 Track Loader 75-100 HP Unit/Jam 222,476.29 292,212.06 222,251.44 291,916.73 221,928.14 291,492.09 221,806.16 291,331.87 221,994.03 291,578.63 222,312.71 291,997.20 222,466.05 292,198.61 222,126.91 495,365.77
47 Trailer 20 Ton Unit/Jam 359,167.23 496,057.58 358,804.23 495,556.24 358,282.29 494,835.37 358,085.36 494,563.39 358,388.67 494,982.29 358,903.14 495,692.84 359,150.70 496,034.75 358,603.18 823,992.13
48 Trailler 15 Ton Unit/Jam 311,089.73 472,961.79 310,775.32 472,483.78 310,323.24 471,796.47 310,152.68 471,537.15 310,415.38 471,936.55 310,860.99 472,614.02 311,075.41 472,940.01 310,601.18 756,931.58
49 Truck Mixer (agitator) Unit/Jam 391,218.90 574,382.47 390,823.51 573,801.96 390,254.99 572,967.27 390,040.49 572,652.34 390,370.86 573,137.38 390,931.24 573,960.13 391,200.89 574,356.03 390,604.52 931,528.03
50 Vibrating Rammer Unit/Jam 80,129.17 80,129.17 80,048.19 80,048.19 79,931.74 79,931.74 79,887.81 79,887.81 79,955.48 79,955.48 80,070.25 80,070.25 80,125.48 80,125.48 80,003.33 153,338.38
51 Vibratory Roller 5-8 T Unit/Jam 193,252.71 414,720.21 193,057.40 414,301.07 192,776.56 413,698.39 192,670.60 413,471.01 192,833.80 413,821.22 193,110.61 414,415.27 193,243.81 414,701.12 192,949.22 590,935.80
52 Water Pump 70-100 MM Unit/Jam 60,332.55 60,332.55 60,271.58 60,271.58 60,183.90 60,183.90 60,150.82 60,150.82 60,201.77 60,201.77 60,288.19 60,288.19 60,329.78 60,329.78 60,237.80 115,454.78
53 Water Tanker 3000-4500 L Unit/Jam 218,705.50 218,705.50 218,484.47 218,484.47 218,166.64 218,166.64 218,046.73 218,046.73 218,231.42 218,231.42 218,544.69 218,544.69 218,695.44 218,695.44 218,362.04 418,523.59
54 Welding Set Unit/Jam 122,550.50 122,550.50 122,426.64 122,426.64 122,248.55 122,248.55 122,181.36 122,181.36 122,284.85 122,284.85 122,460.39 122,460.39 122,544.86 122,544.86 122,358.04 234,517.53
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 213,049.33 338,403.66 212,834.01 338,061.65 212,524.40 337,569.88 212,407.59 337,384.33 212,587.50 337,670.10 212,892.68 338,154.83 213,039.52 338,388.08 212,714.75 532,857.17
HARGA SATUAN DASAR BAHAN KABUPATEN MOJOKERTO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 296,228.72 296,228.72 295,929.33 295,929.33 295,498.85 295,498.85 295,336.43 295,336.43 295,586.59 295,586.59 296,010.91 296,010.91 296,215.08 296,215.08 295,763.51 566,875.11
2 Agregat Pecah Mesin 20-30 mm M3 282,170.41 282,170.41 281,885.23 281,885.23 281,475.18 281,475.18 281,320.47 281,320.47 281,558.75 281,558.75 281,962.93 281,962.93 282,157.42 282,157.42 281,727.28 539,972.56
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 323,341.18 323,341.18 323,014.39 323,014.39 322,544.51 322,544.51 322,367.23 322,367.23 322,640.28 322,640.28 323,103.43 323,103.43 323,326.29 323,326.29 322,833.39 618,758.59
4 Bahan Agr. Base Kelas A M3 310,287.03 310,287.03 309,973.44 309,973.44 309,522.53 309,522.53 309,352.40 309,352.40 309,614.43 309,614.43 310,058.88 310,058.88 310,272.75 310,272.75 309,799.75 593,777.66
5 Bahan Agr. Base Kelas B M3 292,212.06 292,212.06 291,916.73 291,916.73 291,492.09 291,492.09 291,331.87 291,331.87 291,578.63 291,578.63 291,997.20 291,997.20 292,198.61 292,198.61 291,753.16 559,188.67
6 Bahan Agr. Base Kelas C M3 268,112.10 268,112.10 267,841.13 267,841.13 267,451.50 267,451.50 267,304.50 267,304.50 267,530.91 267,530.91 267,914.96 267,914.96 268,099.75 268,099.75 267,691.04 513,070.01
7 Bahan Agr. Base Kelas C2 M3 245,016.30 245,016.30 244,768.67 244,768.67 244,412.61 244,412.61 244,278.27 244,278.27 244,485.18 244,485.18 244,836.14 244,836.14 245,005.02 245,005.02 244,631.52 468,872.97
8 Bahan Agr. Base Kelas S M3 197,820.53 197,820.53 197,620.61 197,620.61 197,333.13 197,333.13 197,224.67 197,224.67 197,391.72 197,391.72 197,675.08 197,675.08 197,811.43 197,811.43 197,509.87 378,557.28
9 Bahan Pilihan M3 197,820.53 197,820.53 197,620.61 197,620.61 197,333.13 197,333.13 197,224.67 197,224.67 197,391.72 197,391.72 197,675.08 197,675.08 197,811.43 197,811.43 197,509.87 378,557.28
10 Bahan Tanah Timbunan M3 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 215,220.38
11 Batu Belah/Kerakal M3 319,324.52 319,324.52 319,001.79 319,001.79 318,537.75 318,537.75 318,362.67 318,362.67 318,632.32 318,632.32 319,089.72 319,089.72 319,309.82 319,309.82 318,823.04 611,072.15
12 Batu Kali M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
13 Chipping M3 208,866.35 208,866.35 208,655.26 208,655.26 208,351.73 208,351.73 208,237.21 208,237.21 208,413.59 208,413.59 208,712.77 208,712.77 208,856.74 208,856.74 208,538.34 399,694.99
14 Chipping (kg) Kg 271.12 271.12 270.85 270.85 270.46 270.46 270.31 270.31 270.54 270.54 270.93 270.93 271.11 271.11 270.70 518.83
15 Filler Cement Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12 1,002.59 1,921.61
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 375,557.77 375,557.77 375,178.21 375,178.21 374,632.44 374,632.44 374,426.53 374,426.53 374,743.67 374,743.67 375,281.62 375,281.62 375,540.48 375,540.48 374,967.98 718,682.34
18 Kapur M3 93,387.36 93,387.36 93,292.98 93,292.98 93,157.27 93,157.27 93,106.06 93,106.06 93,184.92 93,184.92 93,318.69 93,318.69 93,383.06 93,383.06 93,240.70 178,709.78
19 Pasir Beton (Kasar) M3 446,853.49 446,853.49 446,401.88 446,401.88 445,752.51 445,752.51 445,507.50 445,507.50 445,884.85 445,884.85 446,524.93 446,524.93 446,832.92 446,832.92 446,151.74 855,116.69
20 Pasir Halus (untuk HRS) M3 282,170.41 282,170.41 281,885.23 281,885.23 281,475.18 281,475.18 281,320.47 281,320.47 281,558.75 281,558.75 281,962.93 281,962.93 282,157.42 282,157.42 281,727.28 539,972.56
21 Pasir Pasang (Sedang) M3 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46 315,815.28 605,307.32
22 Pasir Urug M3 191,795.54 191,795.54 191,601.70 191,601.70 191,322.99 191,322.99 191,217.83 191,217.83 191,379.79 191,379.79 191,654.52 191,654.52 191,786.71 191,786.71 191,494.34 367,027.61
23 Pasir Urug (ada unsur lempung) M3 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
24 Sirtu M3 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
26 Anti Pengelupas Liter 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
27 Arbocell Kg 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 255,574.20
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
38 Bahan Pengawet: Kreosot Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
39 Bensin Liter 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
40 Beton B-0 M3 555,303.33 652,707.35 554,742.11 652,047.68 553,935.14 651,099.17 553,630.67 650,741.30 554,099.60 651,292.48 554,895.02 652,227.42 555,277.77 652,677.30 554,431.26 1,159,901.68
41 Beton K-125 (fc' 10 MPa) M3 574,382.47 683,836.47 573,801.96 683,145.34 572,967.27 682,151.59 572,652.34 681,776.65 573,137.38 682,354.12 573,960.13 683,333.65 574,356.03 683,804.99 573,480.44 1,208,443.34
42 Beton K-175 (fc' 15 MPa) M3 621,578.23 709,944.76 620,950.03 709,227.25 620,046.74 708,195.55 619,705.94 707,806.30 620,230.84 708,405.82 621,121.19 709,422.75 621,549.62 709,912.08 620,602.08 1,277,704.68
43 Beton K-250 (fc' 20 MPa) M3 692,873.95 741,073.88 692,173.70 740,324.91 691,166.81 739,247.98 690,786.91 738,841.66 691,372.02 739,467.46 692,364.49 740,528.98 692,842.06 741,039.77 691,785.84 1,374,035.51
44 Beton K-300 (fc' 25 MPa) M3 720,990.58 767,182.18 720,261.90 766,406.82 719,214.16 765,291.94 718,818.85 764,871.31 719,427.70 765,519.16 720,460.44 766,618.08 720,957.39 767,146.86 719,858.31 1,425,835.42
45 Beton K-350 (fc' 30 MPa) M3 749,107.20 792,286.30 748,350.11 791,485.57 747,261.50 790,334.22 746,850.78 789,899.82 747,483.37 790,568.87 748,556.39 791,703.75 749,072.72 792,249.83 747,930.78 1,476,632.76
46 Beton K-400 (fc' 35 MPa) M3 777,223.83 818,394.60 776,438.32 817,567.48 775,308.85 816,378.19 774,882.71 815,929.47 775,539.05 816,620.57 776,652.35 817,792.84 777,188.05 818,356.93 776,003.25 1,528,432.67
47 Beton K-450 (fc' 40 MPa) M3 815,382.10 815,382.10 814,558.03 814,558.03 813,373.11 813,373.11 812,926.05 812,926.05 813,614.61 813,614.61 814,782.56 814,782.56 815,344.57 815,344.57 814,101.60 1,560,347.76
48 Beton K-500 (fc' 45 MPa) M3 847,515.39 847,515.39 846,658.84 846,658.84 845,427.22 845,427.22 844,962.55 844,962.55 845,678.24 845,678.24 846,892.22 846,892.22 847,476.37 847,476.37 846,184.42 1,621,839.30
49 Bunker Oil Liter 3,012.50 3,012.50 3,009.45 3,009.45 3,005.07 3,005.07 3,003.42 3,003.42 3,005.97 3,005.97 3,010.28 3,010.28 3,012.36 3,012.36 3,007.76 5,764.83
50 Cat Kg 61,254.07 61,254.07 61,192.17 61,192.17 61,103.15 61,103.15 61,069.57 61,069.57 61,121.29 61,121.29 61,209.03 61,209.03 61,251.25 61,251.25 61,157.88 117,218.24
51 Cat Anti Karat Kg 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
52 Cat Marka (Non Thermoplas) Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
53 Cat Marka (Thermoplastic) Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
54 Cerucuk Diameter 10-15 cm M' 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,230,102.31 1,230,102.31 1,228,859.10 1,228,859.10 1,227,071.51 1,227,071.51 1,226,397.06 1,226,397.06 1,227,435.83 1,227,435.83 1,229,197.83 1,229,197.83 1,230,045.69 1,230,045.69 1,228,170.52 2,353,972.91
57 Curing Compound Liter 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 574,382.47 574,382.47 573,801.96 573,801.96 572,967.27 572,967.27 572,652.34 572,652.34 573,137.38 573,137.38 573,960.13 573,960.13 574,356.03 574,356.03 573,480.44 1,099,161.23
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 668,773.99 668,773.99 668,098.09 668,098.09 667,126.22 667,126.22 666,759.54 666,759.54 667,324.30 667,324.30 668,282.25 668,282.25 668,743.21 668,743.21 667,723.73 1,279,792.62
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 847,515.39 847,515.39 846,658.84 846,658.84 845,427.22 845,427.22 844,962.55 844,962.55 845,678.24 845,678.24 846,892.22 846,892.22 847,476.37 847,476.37 846,184.42 1,621,839.30
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
64 Oxygen (Isi 6 M3) Botol 161,670.59 161,670.59 161,507.20 161,507.20 161,272.25 161,272.25 161,183.61 161,183.61 161,320.14 161,320.14 161,551.72 161,551.72 161,663.15 161,663.15 161,416.70 309,379.30
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,300,393.87 1,300,393.87 1,299,079.62 1,299,079.62 1,297,189.88 1,297,189.88 1,296,476.89 1,296,476.89 1,297,575.02 1,297,575.02 1,299,437.71 1,299,437.71 1,300,334.01 1,300,334.01 1,298,351.69 2,488,485.65
67 Seal Coat M2 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
68 Seal Guard Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
69 Semen/PC (50 kg) Zak 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
70 Semen/PC (kg) Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12 1,002.59 1,921.61
71 Slurry Seal Ton 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
83 Baja Tulangan (Ulir) D32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
85 Besi Beton Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,254,831.50 12,254,831.50 12,242,446.06 12,242,446.06 12,224,637.27 12,224,637.27 12,217,918.13 12,217,918.13 12,228,266.86 12,228,266.86 12,245,820.70 12,245,820.70 12,254,267.38 12,254,267.38 12,235,586.11 23,451,335.05
87 Box Culvert Type DUB 200×200 M' 13,008,959.53 13,008,959.53 12,995,811.92 12,995,811.92 12,976,907.23 12,976,907.23 12,969,774.61 12,969,774.61 12,980,760.17 12,980,760.17 12,999,394.23 12,999,394.23 13,008,360.70 13,008,360.70 12,988,529.83 24,894,464.56
88 Box Culvert Type uk 300×200 M' 14,045,257.96 14,045,257.96 14,031,063.01 14,031,063.01 14,010,652.36 14,010,652.36 14,002,951.56 14,002,951.56 14,014,812.23 14,014,812.23 14,034,930.69 14,034,930.69 14,044,611.43 14,044,611.43 14,023,200.82 26,877,566.64
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 181,753.89 181,753.89 181,570.20 181,570.20 181,306.08 181,306.08 181,206.42 181,206.42 181,359.91 181,359.91 181,620.25 181,620.25 181,745.53 181,745.53 181,468.46 347,811.51
91 Ducting (Strand Prestress) M' 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,050,505.24 2,050,505.24 2,048,432.88 2,048,432.88 2,045,453.07 2,045,453.07 2,044,328.81 2,044,328.81 2,046,060.38 2,046,060.38 2,048,997.53 2,048,997.53 2,050,410.85 2,050,410.85 2,047,285.06 3,923,928.73
94 Expansion Join Tipe Rubber M' 1,484,156.09 1,484,156.09 1,482,656.12 1,482,656.12 1,480,499.33 1,480,499.33 1,479,685.59 1,479,685.59 1,480,938.91 1,480,938.91 1,483,064.81 1,483,064.81 1,484,087.77 1,484,087.77 1,481,825.32 2,840,140.38
95 Expansion Join Tipe Torma M' 1,703,064.10 1,703,064.10 1,701,342.88 1,701,342.88 1,698,867.98 1,698,867.98 1,697,934.21 1,697,934.21 1,699,372.39 1,699,372.39 1,701,811.86 1,701,811.86 1,702,985.70 1,702,985.70 1,700,389.55 3,259,051.48
96 Expansion Tipe Joint Asphaltic Plug M' 2,020,380.28 2,020,380.28 2,018,338.37 2,018,338.37 2,015,402.34 2,015,402.34 2,014,294.60 2,014,294.60 2,016,000.73 2,016,000.73 2,018,894.73 2,018,894.73 2,020,287.28 2,020,287.28 2,017,207.41 3,866,280.41
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
99 Glass Bead Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
100 Joint Sealent Kg 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
101 Joint Socket Pile 16×16×16 Set 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
102 Joint Socket Pile 35×35 Set 737,057.22 737,057.22 736,312.31 736,312.31 735,241.21 735,241.21 734,837.09 734,837.09 735,459.51 735,459.51 736,515.27 736,515.27 737,023.29 737,023.29 735,899.72 1,410,462.14
103 Kawat Beton Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
104 Kawat Bronjong Kg 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
105 Kawat Las Dos 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 247,887.76
106 Kayu Acuan (Kelas III/Meranti) M3 4,052,810.55 4,052,810.55 4,048,714.54 4,048,714.54 4,042,824.98 4,042,824.98 4,040,602.88 4,040,602.88 4,044,025.32 4,044,025.32 4,049,830.58 4,049,830.58 4,052,623.99 4,052,623.99 4,046,445.88 7,755,620.14
107 Kayu Perancah (Gelam) M3 2,610,829.39 2,610,829.39 2,608,190.74 2,608,190.74 2,604,396.66 2,604,396.66 2,602,965.19 2,602,965.19 2,605,169.93 2,605,169.93 2,608,909.69 2,608,909.69 2,610,709.21 2,610,709.21 2,606,729.26 4,996,187.41
108 Kerb Pracetak Type 1 (Peninggi) Buah 51,212.42 51,212.42 51,160.66 51,160.66 51,086.24 51,086.24 51,058.16 51,058.16 51,101.41 51,101.41 51,174.77 51,174.77 51,210.07 51,210.07 51,132.00 98,002.14
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
110 Marmer Nama Jembatan Buah 565,344.98 565,344.98 564,773.61 564,773.61 563,952.05 563,952.05 563,642.08 563,642.08 564,119.49 564,119.49 564,929.29 564,929.29 565,318.96 565,318.96 564,457.14 1,081,866.73
111 Mata Kucing Buah 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48 147,380.46 282,476.75
112 Matras Concrete (Tebal=10 cm) M2 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
113 Mini Pile 16×16×16 M' 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 244,044.54
114 Mini Timber Pile Buah 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
115 Multipleks 12 mm Lbr 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
116 Paku Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
117 Paving Block (Model Bata 8 cm) M2 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 62,667,938.73 62,667,938.73 62,604,602.88 62,604,602.88 62,513,533.47 62,513,533.47 62,479,173.59 62,479,173.59 62,532,094.22 62,532,094.22 62,621,859.90 62,621,859.90 62,665,053.98 62,665,053.98 62,569,522.92 119,923,870.66
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 88,780,249.31 88,780,249.31 88,690,522.85 88,690,522.85 88,561,506.88 88,561,506.88 88,512,830.01 88,512,830.01 88,587,801.48 88,587,801.48 88,714,970.48 88,714,970.48 88,776,162.55 88,776,162.55 88,640,825.86 169,893,431.18
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 169,684,831.35 169,684,831.35 169,513,338.02 169,513,338.02 169,266,751.05 169,266,751.05 169,173,715.43 169,173,715.43 169,317,007.66 169,317,007.66 169,560,064.55 169,560,064.55 169,677,020.35 169,677,020.35 169,418,352.65 324,715,670.89
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 222,514,964.10 222,514,964.10 222,290,077.57 222,290,077.57 221,966,717.55 221,966,717.55 221,844,715.97 221,844,715.97 222,032,621.19 222,032,621.19 222,351,352.07 222,351,352.07 222,504,721.20 222,504,721.20 222,165,519.20 425,813,523.08
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 283,647,534.31 283,647,534.31 283,360,863.67 283,360,863.67 282,948,665.45 282,948,665.45 282,793,145.81 282,793,145.81 283,032,675.10 283,032,675.10 283,438,972.39 283,438,972.39 283,634,477.34 283,634,477.34 283,202,084.79 542,799,251.23
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 342,220,487.56 342,220,487.56 341,874,619.69 341,874,619.69 341,377,302.92 341,377,302.92 341,189,668.62 341,189,668.62 341,478,660.49 341,478,660.49 341,968,857.79 341,968,857.79 342,204,734.33 342,204,734.33 341,683,053.12 654,886,794.10
124 Pelat Rambu (Eng. Grade) Buah 197,820.53 197,820.53 197,620.61 197,620.61 197,333.13 197,333.13 197,224.67 197,224.67 197,391.72 197,391.72 197,675.08 197,675.08 197,811.43 197,811.43 197,509.87 378,557.28
125 Pelat Rambu (High L Grade) Buah 230,957.98 230,957.98 230,724.57 230,724.57 230,388.94 230,388.94 230,262.30 230,262.30 230,457.34 230,457.34 230,788.16 230,788.16 230,947.35 230,947.35 230,595.28 441,970.42
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 259,074.61 259,074.61 258,812.77 258,812.77 258,436.28 258,436.28 258,294.24 258,294.24 258,513.02 258,513.02 258,884.12 258,884.12 259,062.68 259,062.68 258,667.75 495,775.52
129 Pipa Galvanis Dia 1,5" M' 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
130 Pipa Galvanis Dia 2" M' 296,228.72 296,228.72 295,929.33 295,929.33 295,498.85 295,498.85 295,336.43 295,336.43 295,586.59 295,586.59 296,010.91 296,010.91 296,215.08 296,215.08 295,763.51 566,875.11
131 Pipa Galvanis Dia 3" M' 226,941.32 226,941.32 226,711.96 226,711.96 226,382.17 226,382.17 226,257.74 226,257.74 226,449.39 226,449.39 226,774.46 226,774.46 226,930.88 226,930.88 226,584.93 434,283.98
132 Pipa Porus M' 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
133 Pipa PVC Dia 4" M' 111,462.33 111,462.33 111,349.68 111,349.68 111,187.70 111,187.70 111,126.59 111,126.59 111,220.72 111,220.72 111,380.38 111,380.38 111,457.20 111,457.20 111,287.29 213,298.77
134 Plastik Filter M2 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
135 Rel Pengaman M' 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,936,030.41 1,936,030.41 1,934,073.75 1,934,073.75 1,931,260.30 1,931,260.30 1,930,198.80 1,930,198.80 1,931,833.70 1,931,833.70 1,934,606.88 1,934,606.88 1,935,941.29 1,935,941.29 1,932,990.00 3,704,865.12
137 Strip Bearing Buah 296,228.72 296,228.72 295,929.33 295,929.33 295,498.85 295,498.85 295,336.43 295,336.43 295,586.59 295,586.59 296,010.91 296,010.91 296,215.08 296,215.08 295,763.51 566,875.11
138 Tiang Pancang Baja Diameter 400 M' 685,844.80 685,844.80 685,151.64 685,151.64 684,154.97 684,154.97 683,778.93 683,778.93 684,358.10 684,358.10 685,340.51 685,340.51 685,813.23 685,813.23 684,767.72 1,312,460.00
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 837,473.74 837,473.74 836,627.34 836,627.34 835,410.31 835,410.31 834,951.14 834,951.14 835,658.35 835,658.35 836,857.95 836,857.95 837,435.18 837,435.18 836,158.54 1,602,623.19
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,753,272.35 1,753,272.35 1,751,500.39 1,751,500.39 1,748,952.53 1,748,952.53 1,747,991.24 1,747,991.24 1,749,471.81 1,749,471.81 1,751,983.20 1,751,983.20 1,753,191.65 1,753,191.65 1,750,518.96 3,355,132.01
HARGA SATUAN DASAR UPAH KABUPATEN SIDOARJO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
2 Tukang OH 127,000 127,000 127,343.62 127,343.62 127,519.17 127,519.17 127,522.72 127,522.72 127,354.30 127,354.30 127,172.38 127,172.38 127,144.85 127,144.85 127,294.11 127,294.11 127,479.24 127,479.24
3 Mandor OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
4 Operator OH 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
5 Pembantu Operator OH 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
6 Sopir OH 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
7 Pembantu Sopir OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
8 Mekanik OH 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
9 Pembantu Mekanik OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
10 Kepala Tukang OH 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
11 Pemasak Aspal OH 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07

HARGA SATUAN DASAR ALAT KABUPATEN SIDOARJO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 444,097 496,000 445,298.31 497,342.00 445,912.19 498,027.63 445,924.60 498,041.50 445,335.65 497,383.71 444,699.53 496,673.24 444,603.26 496,565.72 445,125.19 497,148.66 445,772.55 497,871.68
2 Asphalt Distribution Unit/Jam 273,435 352,000 274,175.18 352,952.39 274,553.15 353,438.97 274,560.80 353,448.80 274,198.17 352,981.99 273,806.50 352,477.78 273,747.23 352,401.48 274,068.59 352,815.18 274,467.18 353,328.29
3 Asphalt Finisher Unit/Jam 200,834 952,000 201,376.94 954,575.78 201,654.56 955,891.75 201,660.17 955,918.36 201,393.83 954,655.83 201,106.15 953,292.19 201,062.62 953,085.82 201,298.65 954,204.68 201,591.41 955,592.42
4 Asphalt Liquid Mixer Unit/Jam 71,659 131,000 71,852.81 131,354.44 71,951.86 131,535.52 71,953.86 131,539.19 71,858.83 131,365.46 71,756.19 131,177.81 71,740.65 131,149.41 71,824.87 131,303.37 71,929.33 131,494.33
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 96,174 96,174 96,434.03 96,434.03 96,566.97 96,566.97 96,569.66 96,569.66 96,442.11 96,442.11 96,304.36 96,304.36 96,283.51 96,283.51 96,396.54 96,396.54 96,536.73 96,536.73
6 Asphalt Mixing Plant Unit/Jam 1,074,884 5,513,587 1,077,792.08 5,528,505.16 1,079,277.91 5,536,126.69 1,079,307.96 5,536,280.81 1,077,882.46 5,528,968.77 1,076,342.80 5,521,071.12 1,076,109.80 5,519,875.95 1,077,373.07 5,526,355.89 1,078,939.94 5,534,393.09
7 Asphalt Sprayer Unit/Jam 88,631 88,631 88,870.57 88,870.57 88,993.09 88,993.09 88,995.57 88,995.57 88,878.03 88,878.03 88,751.07 88,751.07 88,731.86 88,731.86 88,836.03 88,836.03 88,965.22 88,965.22
8 Asphalt Tanker Unit/Jam 414,867 481,000 415,989.93 482,301.42 416,563.40 482,966.31 416,575.00 482,979.76 416,024.81 482,341.86 415,430.55 481,652.88 415,340.62 481,548.62 415,828.20 482,113.92 416,432.96 482,815.08
9 Blending Equipment Unit/Jam 134,832 213,000 135,196.73 213,576.30 135,383.11 213,870.74 135,386.88 213,876.69 135,208.06 213,594.21 135,014.93 213,289.11 134,985.70 213,242.94 135,144.17 213,493.27 135,340.71 213,803.77
10 Bore Pile Machine Unit/Jam 371,495 646,000 372,500.07 647,747.85 373,013.59 648,640.83 373,023.98 648,658.89 372,531.31 647,802.17 371,999.18 646,876.84 371,918.65 646,736.81 372,355.26 647,496.03 372,896.79 648,437.71
11 Bore Pile Machine Dia 60 Unit/Jam 243,263 735,000 243,921.37 736,988.66 244,257.63 738,004.66 244,264.43 738,025.20 243,941.82 737,050.46 243,593.37 735,997.65 243,540.64 735,838.32 243,826.54 736,702.14 244,181.14 737,773.56
12 Bore Pile Machine Dia 80 Unit/Jam 961,738 961,738 964,340.28 964,340.28 965,669.71 965,669.71 965,696.59 965,696.59 964,421.15 964,421.15 963,043.56 963,043.56 962,835.08 962,835.08 963,965.38 963,965.38 965,367.32 965,367.32
13 Bulldozer 100-150 HP Unit/Jam 377,152 377,152 378,172.66 378,172.66 378,694.00 378,694.00 378,704.55 378,704.55 378,204.37 378,204.37 377,664.14 377,664.14 377,582.39 377,582.39 378,025.64 378,025.64 378,575.42 378,575.42
14 Cement Tanker Unit/Jam 350,752 453,000 351,700.57 454,225.66 352,185.42 454,851.85 352,195.23 454,864.51 351,730.07 454,263.75 351,227.65 453,614.88 351,151.62 453,516.68 351,563.85 454,049.08 352,075.14 454,709.42
15 Cold Milling Unit/Jam 547,814 1,312,227 549,295.79 1,315,777.43 550,053.04 1,317,591.35 550,068.35 1,317,628.03 549,341.85 1,315,887.77 548,557.16 1,314,008.14 548,438.42 1,313,723.69 549,082.24 1,315,265.91 549,880.79 1,317,178.75
16 Cold Recycler Unit/Jam 4,613,514 4,613,514 4,625,997.06 4,625,997.06 4,632,374.40 4,632,374.40 4,632,503.36 4,632,503.36 4,626,384.98 4,626,384.98 4,619,776.60 4,619,776.60 4,618,776.53 4,618,776.53 4,624,198.64 4,624,198.64 4,630,923.80 4,630,923.80
17 Compressor 4000-6500 L\M Unit/Jam 140,489 140,489 140,869.32 140,869.32 141,063.52 141,063.52 141,067.44 141,067.44 140,881.13 140,881.13 140,679.89 140,679.89 140,649.44 140,649.44 140,814.55 140,814.55 141,019.34 141,019.34
18 Concrete Breaker Unit/Jam 511,984 976,000 513,369.39 978,640.72 514,077.11 979,989.86 514,091.42 980,017.14 513,412.44 978,722.78 512,679.07 977,324.76 512,568.09 977,113.20 513,169.81 978,260.26 513,916.13 979,682.98
19 Concrete Mixer (350) Unit/Jam 95,231 95,231 95,488.60 95,488.60 95,620.24 95,620.24 95,622.90 95,622.90 95,496.60 95,496.60 95,360.20 95,360.20 95,339.55 95,339.55 95,451.47 95,451.47 95,590.29 95,590.29
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 108,431 108,431 108,724.64 108,724.64 108,874.53 108,874.53 108,877.56 108,877.56 108,733.76 108,733.76 108,578.44 108,578.44 108,554.94 108,554.94 108,682.37 108,682.37 108,840.43 108,840.43
21 Concrete Pan Mixer Unit/Jam 288,521 618,000 289,302.08 619,672.09 289,700.91 620,526.37 289,708.98 620,543.64 289,326.34 619,724.06 288,913.07 618,838.84 288,850.52 618,704.87 289,189.61 619,431.19 289,610.19 620,332.05
22 Concrete Pump Unit/Jam 219,691 236,000 220,285.57 236,638.53 220,589.26 236,964.76 220,595.40 236,971.36 220,304.05 236,658.38 219,989.36 236,320.33 219,941.74 236,269.18 220,199.94 236,546.54 220,520.18 236,890.56
23 Concrete Vibrator Unit/Jam 82,031 82,031 82,252.55 82,252.55 82,365.95 82,365.95 82,368.24 82,368.24 82,259.45 82,259.45 82,141.95 82,141.95 82,124.17 82,124.17 82,220.58 82,220.58 82,340.15 82,340.15
24 Crane 10-15 Ton Unit/Jam 294,179 294,179 294,974.67 294,974.67 295,381.32 295,381.32 295,389.55 295,389.55 294,999.41 294,999.41 294,578.03 294,578.03 294,514.26 294,514.26 294,860.00 294,860.00 295,288.83 295,288.83
25 Crane On Track 35 Ton Unit/Jam 244,206 464,000 244,866.80 465,255.42 245,204.37 465,896.82 245,211.19 465,909.79 244,887.33 465,294.44 244,537.53 464,629.81 244,484.59 464,529.23 244,771.60 465,074.55 245,127.58 465,750.93
26 Crane On Track 75-100 Ton Unit/Jam 383,752 582,000 384,790.68 583,574.69 385,321.15 584,379.20 385,331.88 584,395.47 384,822.95 583,623.63 384,273.26 582,789.97 384,190.08 582,663.81 384,641.09 583,347.82 385,200.49 584,196.20
27 Dump Truck 10 Ton Unit/Jam 363,009 363,009 363,991.18 363,991.18 364,492.98 364,492.98 364,503.13 364,503.13 364,021.71 364,021.71 363,501.73 363,501.73 363,423.05 363,423.05 363,849.68 363,849.68 364,378.84 364,378.84
28 Dump Truck 3-4 M3 Unit/Jam 198,005 259,000 198,540.65 259,700.76 198,814.35 260,058.78 198,819.89 260,066.02 198,557.30 259,722.54 198,273.67 259,351.55 198,230.75 259,295.41 198,463.46 259,599.80 198,752.09 259,977.35
29 Excavator 80-140 HP Unit/Jam 286,636 455,000 287,411.22 456,231.07 287,807.44 456,860.03 287,815.45 456,872.74 287,435.32 456,269.33 287,024.75 455,617.59 286,962.61 455,518.96 287,299.49 456,053.71 287,717.32 456,716.96
30 Flat Bed Truck 3-4 M3 Unit/Jam 347,923 465,000 348,864.28 466,258.13 349,345.22 466,900.91 349,354.94 466,913.90 348,893.53 466,297.23 348,395.17 465,631.16 348,319.75 465,530.37 348,728.65 466,076.87 349,235.82 466,754.70
31 Fulvi Mixer Unit/Jam 871,222 1,361,000 873,578.84 1,364,682.39 874,783.15 1,366,563.73 874,807.50 1,366,601.77 873,652.10 1,364,796.83 872,404.16 1,362,847.34 872,215.31 1,362,552.32 873,239.23 1,364,151.86 874,509.22 1,366,135.80
32 Generator Set Unit/Jam 387,524 411,000 388,572.41 412,112.02 389,108.09 412,680.16 389,118.92 412,691.64 388,604.99 412,146.58 388,049.90 411,557.87 387,965.90 411,468.78 388,421.35 411,951.81 388,986.24 412,550.93
33 Hot Recycler Unit/Jam 2,846,556 8,347,000 2,854,258.15 8,369,584.09 2,858,192.99 8,381,122.30 2,858,272.56 8,381,355.61 2,854,497.50 8,370,285.95 2,850,420.10 8,358,329.72 2,849,803.06 8,356,520.36 2,853,148.52 8,366,330.31 2,857,297.97 8,378,497.80
34 Jack Hammer Unit/Jam 53,744 53,744 53,889.60 53,889.60 53,963.90 53,963.90 53,965.40 53,965.40 53,894.12 53,894.12 53,817.14 53,817.14 53,805.49 53,805.49 53,868.65 53,868.65 53,947.00 53,947.00
35 Launching Gantry Unit/Jam 68,395,612 68,395,612 68,580,666.34 68,580,666.34 68,675,210.85 68,675,210.85 68,677,122.60 68,677,122.60 68,586,417.41 68,586,417.41 68,488,447.67 68,488,447.67 68,473,621.68 68,473,621.68 68,554,004.78 68,554,004.78 68,653,705.59 68,653,705.59
36 Motor Grader > 100 HP Unit/Jam 268,721 279,000 269,448.02 279,754.88 269,819.48 280,140.54 269,826.99 280,148.34 269,470.62 279,778.34 269,085.70 279,378.70 269,027.45 279,318.22 269,343.27 279,646.12 269,734.99 280,052.82
37 Pedestrian Roller Unit/Jam 88,631 88,631 88,870.57 88,870.57 88,993.09 88,993.09 88,995.57 88,995.57 88,878.03 88,878.03 88,751.07 88,751.07 88,731.86 88,731.86 88,836.03 88,836.03 88,965.22 88,965.22
38 Pile Driver + Hammer Unit/Jam 100,888 295,000 101,161.19 295,798.17 101,300.65 296,205.95 101,303.47 296,214.20 101,169.67 295,822.97 101,025.16 295,400.42 101,003.29 295,336.47 101,121.86 295,683.17 101,268.92 296,113.20
39 Rock Drill Breaker Unit/Jam 98,060 319,000 98,324.89 319,863.10 98,460.44 320,304.06 98,463.18 320,312.98 98,333.14 319,889.93 98,192.68 319,432.99 98,171.42 319,363.84 98,286.67 319,738.75 98,429.61 320,203.76
40 Split Form Paver Unit/Jam 207,434 207,434 207,994.96 207,994.96 208,281.70 208,281.70 208,287.50 208,287.50 208,012.40 208,012.40 207,715.28 207,715.28 207,670.31 207,670.31 207,914.10 207,914.10 208,216.48 208,216.48
41 Stone Crusher Unit/Jam 555,357 692,000 556,859.24 693,872.31 557,626.92 694,828.88 557,642.44 694,848.22 556,905.94 693,930.50 556,110.45 692,939.28 555,990.06 692,789.28 556,642.76 693,602.56 557,452.30 694,611.29
42 Tamper Unit/Jam 82,973 82,973 83,197.99 83,197.99 83,312.68 83,312.68 83,315.00 83,315.00 83,204.96 83,204.96 83,086.11 83,086.11 83,068.12 83,068.12 83,165.64 83,165.64 83,286.59 83,286.59
43 Tandem Roller 6-8 T Unit/Jam 400,724 468,000 401,808.45 469,266.25 402,362.38 469,913.17 402,373.58 469,926.25 401,842.15 469,305.60 401,268.15 468,635.24 401,181.28 468,533.79 401,652.24 469,083.81 402,236.38 469,766.02
44 Three Wheel Roller 6-8 T Unit/Jam 132,946 168,000 133,305.86 168,454.55 133,489.64 168,686.78 133,493.35 168,691.48 133,317.04 168,468.68 133,126.61 168,228.03 133,097.79 168,191.62 133,254.04 168,389.06 133,447.83 168,633.96
45 Tire Roller 8-10 T Unit/Jam 237,606 429,000 238,248.78 430,160.73 238,577.22 430,753.74 238,583.86 430,765.73 238,268.75 430,196.80 237,928.41 429,582.30 237,876.90 429,489.31 238,156.15 429,993.50 238,502.51 430,618.85
46 Track Loader 75-100 HP Unit/Jam 222,520 293,000 223,121.87 293,792.76 223,429.46 294,197.78 223,435.68 294,205.97 223,140.58 293,817.39 222,821.84 293,397.70 222,773.61 293,334.19 223,035.13 293,678.54 223,359.50 294,105.65
47 Trailer 20 Ton Unit/Jam 359,237 497,000 360,209.46 498,344.71 360,706.04 499,031.72 360,716.08 499,045.61 360,239.66 498,386.50 359,725.09 497,674.60 359,647.22 497,566.86 360,069.42 498,150.97 360,593.09 498,875.45
48 Trailler 15 Ton Unit/Jam 311,151 473,000 311,992.44 474,279.77 312,422.55 474,933.61 312,431.25 474,946.83 312,018.61 474,319.55 311,572.92 473,642.02 311,505.47 473,539.49 311,871.15 474,095.39 312,324.72 474,784.89
49 Truck Mixer (agitator) Unit/Jam 391,295 575,000 392,354.13 576,555.75 392,895.03 577,350.58 392,905.97 577,366.66 392,387.04 576,604.10 391,826.55 575,780.47 391,741.73 575,655.83 392,201.60 576,331.61 392,772.00 577,169.79
50 Vibrating Rammer Unit/Jam 80,145 80,145 80,361.69 80,361.69 80,472.48 80,472.48 80,474.72 80,474.72 80,368.43 80,368.43 80,253.63 80,253.63 80,236.26 80,236.26 80,330.45 80,330.45 80,447.28 80,447.28
51 Vibratory Roller 5-8 T Unit/Jam 193,291 236,000 193,813.49 236,638.53 194,080.68 236,964.76 194,086.08 236,971.36 193,829.74 236,658.38 193,552.87 236,320.33 193,510.97 236,269.18 193,738.14 236,546.54 194,019.90 236,890.56
52 Water Pump 70-100 MM Unit/Jam 60,344 60,344 60,507.63 60,507.63 60,591.04 60,591.04 60,592.73 60,592.73 60,512.70 60,512.70 60,426.26 60,426.26 60,413.18 60,413.18 60,484.10 60,484.10 60,572.07 60,572.07
53 Water Tanker 3000-4500 L Unit/Jam 218,748 218,748 219,340.14 219,340.14 219,642.52 219,642.52 219,648.64 219,648.64 219,358.54 219,358.54 219,045.20 219,045.20 218,997.78 218,997.78 219,254.87 219,254.87 219,573.74 219,573.74
54 Welding Set Unit/Jam 122,574 122,574 122,906.11 122,906.11 123,075.55 123,075.55 123,078.98 123,078.98 122,916.42 122,916.42 122,740.85 122,740.85 122,714.28 122,714.28 122,858.33 122,858.33 123,037.01 123,037.01
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 213,091 283,000 213,667.55 283,765.70 213,962.11 284,156.90 213,968.07 284,164.81 213,685.47 283,789.50 213,380.24 283,384.13 213,334.05 283,322.78 213,584.49 283,655.38 213,895.11 284,067.91
HARGA SATUAN DASAR BAHAN KABUPATEN SIDOARJO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
2 Agregat Pecah Mesin 20-30 mm M3 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 324,000 324,000 324,876.63 324,876.63 325,324.50 325,324.50 325,333.56 325,333.56 324,903.88 324,903.88 324,439.78 324,439.78 324,369.55 324,369.55 324,750.33 324,750.33 325,222.63 325,222.63
4 Bahan Agr. Base Kelas A M3 311,000 311,000 311,841.46 311,841.46 312,271.36 312,271.36 312,280.05 312,280.05 311,867.61 311,867.61 311,422.13 311,422.13 311,354.72 311,354.72 311,720.23 311,720.23 312,173.57 312,173.57
5 Bahan Agr. Base Kelas B M3 292,000 292,000 292,790.05 292,790.05 293,193.69 293,193.69 293,201.85 293,201.85 292,814.60 292,814.60 292,396.34 292,396.34 292,333.05 292,333.05 292,676.23 292,676.23 293,101.88 293,101.88
6 Bahan Agr. Base Kelas C M3 269,000 269,000 269,727.82 269,727.82 270,099.66 270,099.66 270,107.18 270,107.18 269,750.44 269,750.44 269,365.12 269,365.12 269,306.81 269,306.81 269,622.96 269,622.96 270,015.08 270,015.08
7 Bahan Agr. Base Kelas C2 M3 245,000 245,000 245,662.89 245,662.89 246,001.55 246,001.55 246,008.40 246,008.40 245,683.49 245,683.49 245,332.55 245,332.55 245,279.44 245,279.44 245,567.38 245,567.38 245,924.52 245,924.52
8 Bahan Agr. Base Kelas S M3 199,000 199,000 199,538.43 199,538.43 199,813.51 199,813.51 199,819.07 199,819.07 199,555.16 199,555.16 199,270.11 199,270.11 199,226.97 199,226.97 199,460.85 199,460.85 199,750.94 199,750.94
9 Bahan Pilihan M3 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
10 Bahan Tanah Timbunan M3 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
11 Batu Belah/Kerakal M3 320,000 320,000 320,865.81 320,865.81 321,308.15 321,308.15 321,317.10 321,317.10 320,892.72 320,892.72 320,434.35 320,434.35 320,364.98 320,364.98 320,741.07 320,741.07 321,207.54 321,207.54
12 Batu Kali M3 352,000 352,000 352,952.39 352,952.39 353,438.97 353,438.97 353,448.80 353,448.80 352,981.99 352,981.99 352,477.78 352,477.78 352,401.48 352,401.48 352,815.18 352,815.18 353,328.29 353,328.29
13 Chipping M3 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52 210,486.33 210,486.33 210,792.44 210,792.44
14 Chipping (kg) Kg 310 310 310.84 310.84 311.27 311.27 311.28 311.28 310.86 310.86 310.42 310.42 310.35 310.35 310.72 310.72 311.17 311.17
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 6,000 6,000 6,016.23 6,016.23 6,024.53 6,024.53 6,024.70 6,024.70 6,016.74 6,016.74 6,008.14 6,008.14 6,006.84 6,006.84 6,013.90 6,013.90 6,022.64 6,022.64
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 376,000 376,000 377,017.33 377,017.33 377,537.08 377,537.08 377,547.59 377,547.59 377,048.94 377,048.94 376,510.36 376,510.36 376,428.86 376,428.86 376,870.76 376,870.76 377,418.85 377,418.85
18 Kapur M3 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
19 Pasir Beton (Kasar) M3 448,000 448,000 449,212.13 449,212.13 449,831.41 449,831.41 449,843.93 449,843.93 449,249.80 449,249.80 448,608.09 448,608.09 448,510.98 448,510.98 449,037.50 449,037.50 449,690.55 449,690.55
20 Pasir Halus (untuk HRS) M3 283,000 283,000 283,765.70 283,765.70 284,156.90 284,156.90 284,164.81 284,164.81 283,789.50 283,789.50 283,384.13 283,384.13 283,322.78 283,322.78 283,655.38 283,655.38 284,067.91 284,067.91
21 Pasir Pasang (Sedang) M3 317,000 317,000 317,857.69 317,857.69 318,295.89 318,295.89 318,304.75 318,304.75 317,884.35 317,884.35 317,430.28 317,430.28 317,361.56 317,361.56 317,734.12 317,734.12 318,196.21 318,196.21
22 Pasir Urug M3 192,000 192,000 192,519.49 192,519.49 192,784.89 192,784.89 192,790.26 192,790.26 192,535.63 192,535.63 192,260.61 192,260.61 192,218.99 192,218.99 192,444.64 192,444.64 192,724.52 192,724.52
23 Pasir Urug (ada unsur lempung) M3 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
24 Sirtu M3 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
26 Anti Pengelupas Liter 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35 95,220.00 95,220.00 95,358.49 95,358.49
27 Arbocell Kg 134,000 134,000 134,362.56 134,362.56 134,547.79 134,547.79 134,551.53 134,551.53 134,373.82 134,373.82 134,181.88 134,181.88 134,152.84 134,152.84 134,310.32 134,310.32 134,505.66 134,505.66
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
30 Aspal Emulsi (CSS-1) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
31 Aspal Minyak (Drum) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
37 Assetilline Botol 147,000 147,000 147,397.73 147,397.73 147,600.93 147,600.93 147,605.04 147,605.04 147,410.09 147,410.09 147,199.53 147,199.53 147,167.66 147,167.66 147,340.43 147,340.43 147,554.71 147,554.71
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 556,300 556,300 557,804.67 557,804.67 558,573.66 558,573.66 558,589.20 558,589.20 557,851.45 557,851.45 557,054.61 557,054.61 556,934.02 556,934.02 557,587.82 557,587.82 558,398.74 558,398.74
41 Beton K-125 (fc' 10 MPa) M3 575,157 575,157 576,713.31 576,713.31 577,508.36 577,508.36 577,524.43 577,524.43 576,761.67 576,761.67 575,937.81 575,937.81 575,813.14 575,813.14 576,489.10 576,489.10 577,327.51 577,327.51
42 Beton K-175 (fc' 15 MPa) M3 622,301 622,301 623,984.89 623,984.89 624,845.11 624,845.11 624,862.50 624,862.50 624,037.21 624,037.21 623,145.83 623,145.83 623,010.94 623,010.94 623,742.31 623,742.31 624,649.44 624,649.44
43 Beton K-250 (fc' 20 MPa) M3 693,017 693,017 694,892.26 694,892.26 695,850.23 695,850.23 695,869.60 695,869.60 694,950.53 694,950.53 693,957.86 693,957.86 693,807.63 693,807.63 694,622.11 694,622.11 695,632.33 695,632.33
44 Beton K-300 (fc' 25 MPa) M3 721,304 721,304 723,255.21 723,255.21 724,252.28 724,252.28 724,272.44 724,272.44 723,315.86 723,315.86 722,282.67 722,282.67 722,126.31 722,126.31 722,974.04 722,974.04 724,025.49 724,025.49
45 Beton K-350 (fc' 30 MPa) M3 749,590 749,590 751,618.16 751,618.16 752,654.33 752,654.33 752,675.28 752,675.28 751,681.19 751,681.19 750,607.48 750,607.48 750,444.99 750,444.99 751,325.96 751,325.96 752,418.64 752,418.64
46 Beton K-400 (fc' 35 MPa) M3 777,876 777,876 779,981.11 779,981.11 781,056.38 781,056.38 781,078.13 781,078.13 780,046.52 780,046.52 778,932.29 778,932.29 778,763.67 778,763.67 779,677.88 779,677.88 780,811.80 780,811.80
47 Beton K-450 (fc' 40 MPa) M3 815,592 815,592 817,798.38 817,798.38 818,925.78 818,925.78 818,948.58 818,948.58 817,866.96 817,866.96 816,698.70 816,698.70 816,521.91 816,521.91 817,480.45 817,480.45 818,669.34 818,669.34
48 Beton K-500 (fc' 45 MPa) M3 848,592 848,592 850,888.48 850,888.48 852,061.51 852,061.51 852,085.23 852,085.23 850,959.84 850,959.84 849,744.32 849,744.32 849,560.37 849,560.37 850,557.69 850,557.69 851,794.69 851,794.69
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 61,000 61,000 61,165.04 61,165.04 61,249.37 61,249.37 61,251.07 61,251.07 61,170.17 61,170.17 61,082.80 61,082.80 61,069.57 61,069.57 61,141.27 61,141.27 61,230.19 61,230.19
51 Cat Anti Karat Kg 69,000 69,000 69,186.69 69,186.69 69,282.07 69,282.07 69,284.00 69,284.00 69,192.49 69,192.49 69,093.66 69,093.66 69,078.70 69,078.70 69,159.79 69,159.79 69,260.37 69,260.37
52 Cat Marka (Non Thermoplas) Kg 54,000 54,000 54,146.11 54,146.11 54,220.75 54,220.75 54,222.26 54,222.26 54,150.65 54,150.65 54,073.30 54,073.30 54,061.59 54,061.59 54,125.06 54,125.06 54,203.77 54,203.77
53 Cat Marka (Thermoplastic) Kg 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,230,000 1,230,000 1,233,327.95 1,233,327.95 1,235,028.21 1,235,028.21 1,235,062.59 1,235,062.59 1,233,431.38 1,233,431.38 1,231,669.53 1,231,669.53 1,231,402.90 1,231,402.90 1,232,848.48 1,232,848.48 1,234,641.46 1,234,641.46
57 Curing Compound Liter 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 575,000 575,000 576,555.75 576,555.75 577,350.58 577,350.58 577,366.66 577,366.66 576,604.10 576,604.10 575,780.47 575,780.47 575,655.83 575,655.83 576,331.61 576,331.61 577,169.79 577,169.79
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 669,000 669,000 670,810.08 670,810.08 671,734.85 671,734.85 671,753.55 671,753.55 670,866.34 670,866.34 669,908.06 669,908.06 669,763.04 669,763.04 670,549.30 670,549.30 671,524.50 671,524.50
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 849,000 849,000 851,297.10 851,297.10 852,470.69 852,470.69 852,494.42 852,494.42 851,368.49 851,368.49 850,152.38 850,152.38 849,968.35 849,968.35 850,966.15 850,966.15 852,203.74 852,203.74
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
64 Oxygen (Isi 6 M3) Botol 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,301,000 1,301,000 1,304,520.05 1,304,520.05 1,306,318.45 1,306,318.45 1,306,354.82 1,306,354.82 1,304,629.45 1,304,629.45 1,302,765.90 1,302,765.90 1,302,483.88 1,302,483.88 1,304,012.91 1,304,012.91 1,305,909.38 1,305,909.38
67 Seal Coat M2 104,000 104,000 104,281.39 104,281.39 104,425.15 104,425.15 104,428.06 104,428.06 104,290.13 104,290.13 104,141.16 104,141.16 104,118.62 104,118.62 104,240.85 104,240.85 104,392.45 104,392.45
68 Seal Guard Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
69 Semen/PC (50 kg) Zak 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
78 Baja Tulangan (Polos) U32 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
79 Baja Tulangan (Polos) U36 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
80 Baja Tulangan (Ulir) D16 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
81 Baja Tulangan (Ulir) D19 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
84 Baja Tulangan (Ulir) D36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
85 Besi Beton Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,257,000 12,257,000 12,290,163.19 12,290,163.19 12,307,106.27 12,307,106.27 12,307,448.87 12,307,448.87 12,291,193.83 12,291,193.83 12,273,636.93 12,273,636.93 12,270,980.00 12,270,980.00 12,285,385.24 12,285,385.24 12,303,252.37 12,303,252.37
87 Box Culvert Type DUB 200×200 M' 13,012,000 13,012,000 13,047,205.96 13,047,205.96 13,065,192.69 13,065,192.69 13,065,556.39 13,065,556.39 13,048,300.08 13,048,300.08 13,029,661.72 13,029,661.72 13,026,841.13 13,026,841.13 13,042,133.70 13,042,133.70 13,061,101.40 13,061,101.40
88 Box Culvert Type uk 300×200 M' 14,049,000 14,049,000 14,087,011.72 14,087,011.72 14,106,431.92 14,106,431.92 14,106,824.60 14,106,824.60 14,088,193.04 14,088,193.04 14,068,069.28 14,068,069.28 14,065,023.90 14,065,023.90 14,081,535.23 14,081,535.23 14,102,014.56 14,102,014.56
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 183,000 183,000 183,495.13 183,495.13 183,748.10 183,748.10 183,753.21 183,753.21 183,510.52 183,510.52 183,248.39 183,248.39 183,208.72 183,208.72 183,423.80 183,423.80 183,690.56 183,690.56
91 Ducting (Strand Prestress) M' 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,052,000 2,052,000 2,057,552.00 2,057,552.00 2,060,388.52 2,060,388.52 2,060,445.87 2,060,445.87 2,057,724.54 2,057,724.54 2,054,785.26 2,054,785.26 2,054,340.45 2,054,340.45 2,056,752.10 2,056,752.10 2,059,743.32 2,059,743.32
94 Expansion Join Tipe Rubber M' 1,485,000 1,485,000 1,489,017.90 1,489,017.90 1,491,070.64 1,491,070.64 1,491,112.15 1,491,112.15 1,489,142.76 1,489,142.76 1,487,015.65 1,487,015.65 1,486,693.75 1,486,693.75 1,488,439.02 1,488,439.02 1,490,603.72 1,490,603.72
95 Expansion Join Tipe Torma M' 1,704,000 1,704,000 1,708,610.43 1,708,610.43 1,710,965.90 1,710,965.90 1,711,013.53 1,711,013.53 1,708,753.71 1,708,753.71 1,706,312.91 1,706,312.91 1,705,943.54 1,705,943.54 1,707,946.19 1,707,946.19 1,710,430.12 1,710,430.12
96 Expansion Tipe Joint Asphaltic Plug M' 2,021,000 2,021,000 2,026,468.13 2,026,468.13 2,029,261.79 2,029,261.79 2,029,318.28 2,029,318.28 2,026,638.06 2,026,638.06 2,023,743.19 2,023,743.19 2,023,305.10 2,023,305.10 2,025,680.31 2,025,680.31 2,028,626.34 2,028,626.34
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
99 Glass Bead Kg 66,000 66,000 66,178.57 66,178.57 66,269.81 66,269.81 66,271.65 66,271.65 66,184.12 66,184.12 66,089.58 66,089.58 66,075.28 66,075.28 66,152.85 66,152.85 66,249.05 66,249.05
100 Joint Sealent Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
101 Joint Socket Pile 16×16×16 Set 86,000 86,000 86,232.69 86,232.69 86,351.57 86,351.57 86,353.97 86,353.97 86,239.92 86,239.92 86,116.73 86,116.73 86,098.09 86,098.09 86,199.16 86,199.16 86,324.53 86,324.53
102 Joint Socket Pile 35×35 Set 737,000 737,000 738,994.07 738,994.07 740,012.84 740,012.84 740,033.44 740,033.44 739,056.04 739,056.04 738,000.36 738,000.36 737,840.60 737,840.60 738,706.77 738,706.77 739,781.10 739,781.10
103 Kawat Beton Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
104 Kawat Bronjong Kg 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
105 Kawat Las Dos 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
106 Kayu Acuan (Kelas III/Meranti) M3 4,054,000 4,054,000 4,064,968.72 4,064,968.72 4,070,572.64 4,070,572.64 4,070,685.95 4,070,685.95 4,065,309.60 4,065,309.60 4,059,502.66 4,059,502.66 4,058,623.88 4,058,623.88 4,063,388.41 4,063,388.41 4,069,297.96 4,069,297.96
107 Kayu Perancah (Gelam) M3 2,612,000 2,612,000 2,619,067.17 2,619,067.17 2,622,677.78 2,622,677.78 2,622,750.79 2,622,750.79 2,619,286.80 2,619,286.80 2,615,545.37 2,615,545.37 2,614,979.18 2,614,979.18 2,618,048.97 2,618,048.97 2,621,856.51 2,621,856.51
108 Kerb Pracetak Type 1 (Peninggi) Buah 52,000 52,000 52,140.69 52,140.69 52,212.57 52,212.57 52,214.03 52,214.03 52,145.07 52,145.07 52,070.58 52,070.58 52,059.31 52,059.31 52,120.42 52,120.42 52,196.22 52,196.22
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
110 Marmer Nama Jembatan Buah 566,000 566,000 567,531.40 567,531.40 568,313.79 568,313.79 568,329.61 568,329.61 567,578.99 567,578.99 566,768.25 566,768.25 566,645.56 566,645.56 567,310.77 567,310.77 568,135.83 568,135.83
111 Mata Kucing Buah 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
112 Matras Concrete (Tebal=10 cm) M2 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
113 Mini Pile 16×16×16 M' 128,000 128,000 128,346.32 128,346.32 128,523.26 128,523.26 128,526.84 128,526.84 128,357.09 128,357.09 128,173.74 128,173.74 128,145.99 128,145.99 128,296.43 128,296.43 128,483.01 128,483.01
114 Mini Timber Pile Buah 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
115 Multipleks 12 mm Lbr 137,000 137,000 137,370.67 137,370.67 137,560.05 137,560.05 137,563.88 137,563.88 137,382.19 137,382.19 137,185.96 137,185.96 137,156.26 137,156.26 137,317.27 137,317.27 137,516.98 137,516.98
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 90,000 90,000 90,243.51 90,243.51 90,367.92 90,367.92 90,370.43 90,370.43 90,251.08 90,251.08 90,122.16 90,122.16 90,102.65 90,102.65 90,208.43 90,208.43 90,339.62 90,339.62
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 62,681,000 62,681,000 62,850,593.05 62,850,593.05 62,937,238.16 62,937,238.16 62,938,990.17 62,938,990.17 62,855,863.61 62,855,863.61 62,766,079.47 62,766,079.47 62,752,492.22 62,752,492.22 62,826,159.13 62,826,159.13 62,917,529.71 62,917,529.71
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 88,798,000 88,798,000 89,038,256.60 89,038,256.60 89,161,003.72 89,161,003.72 89,163,485.74 89,163,485.74 89,045,723.22 89,045,723.22 88,918,529.14 88,918,529.14 88,899,280.55 88,899,280.55 89,003,641.91 89,003,641.91 89,133,083.44 89,133,083.44
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 169,718,000 169,718,000 170,177,198.07 170,177,198.07 170,411,802.39 170,411,802.39 170,416,546.23 170,416,546.23 170,191,468.88 170,191,468.88 169,948,365.15 169,948,365.15 169,911,575.67 169,911,575.67 170,111,039.64 170,111,039.64 170,358,438.88 170,358,438.88
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 222,559,000 222,559,000 223,161,167.49 223,161,167.49 223,468,814.91 223,468,814.91 223,475,035.72 223,475,035.72 223,179,881.46 223,179,881.46 222,861,088.39 222,861,088.39 222,812,844.66 222,812,844.66 223,074,410.91 223,074,410.91 223,398,836.89 223,398,836.89
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 283,704,000 283,704,000 284,471,604.66 284,471,604.66 284,863,773.94 284,863,773.94 284,871,703.84 284,871,703.84 284,495,460.04 284,495,460.04 284,089,082.99 284,089,082.99 284,027,584.96 284,027,584.96 284,361,012.91 284,361,012.91 284,774,570.43 284,774,570.43
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 342,288,000 342,288,000 343,214,112.65 343,214,112.65 343,687,263.67 343,687,263.67 343,696,831.07 343,696,831.07 343,242,894.09 343,242,894.09 342,752,601.44 342,752,601.44 342,678,404.26 342,678,404.26 343,080,684.05 343,080,684.05 343,579,639.92 343,579,639.92
124 Pelat Rambu (Eng. Grade) Buah 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
125 Pelat Rambu (High L Grade) Buah 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 259,000 259,000 259,700.76 259,700.76 260,058.78 260,058.78 260,066.02 260,066.02 259,722.54 259,722.54 259,351.55 259,351.55 259,295.41 259,295.41 259,599.80 259,599.80 259,977.35 259,977.35
129 Pipa Galvanis Dia 1,5" M' 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
130 Pipa Galvanis Dia 2" M' 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
131 Pipa Galvanis Dia 3" M' 227,000 227,000 227,614.18 227,614.18 227,927.97 227,927.97 227,934.31 227,934.31 227,633.27 227,633.27 227,308.12 227,308.12 227,258.91 227,258.91 227,525.70 227,525.70 227,856.60 227,856.60
132 Pipa Porus M' 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
133 Pipa PVC Dia 4" M' 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
134 Plastik Filter M2 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
135 Rel Pengaman M' 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,937,000 1,937,000 1,942,240.85 1,942,240.85 1,944,918.40 1,944,918.40 1,944,972.54 1,944,972.54 1,942,403.72 1,942,403.72 1,939,629.17 1,939,629.17 1,939,209.29 1,939,209.29 1,941,485.78 1,941,485.78 1,944,309.36 1,944,309.36
137 Strip Bearing Buah 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
138 Tiang Pancang Baja Diameter 400 M' 686,000 686,000 687,856.08 687,856.08 688,804.35 688,804.35 688,823.52 688,823.52 687,913.76 687,913.76 686,931.14 686,931.14 686,782.43 686,782.43 687,588.67 687,588.67 688,588.65 688,588.65
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 839,000 839,000 841,270.04 841,270.04 842,429.81 842,429.81 842,453.26 842,453.26 841,340.59 841,340.59 840,138.81 840,138.81 839,956.94 839,956.94 840,942.99 840,942.99 842,166.01 842,166.01
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,697,000 1,697,000 1,701,591.49 1,701,591.49 1,703,937.29 1,703,937.29 1,703,984.72 1,703,984.72 1,701,734.19 1,701,734.19 1,699,303.41 1,699,303.41 1,698,935.55 1,698,935.55 1,700,929.98 1,700,929.98 1,703,403.71 1,703,403.71
HARGA SATUAN DASAR UPAH KABUPATEN SIDOARJO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 113,292.46
2 Tukang OH 127,528.97 127,528.97 127,400.09 127,400.09 127,214.76 127,214.76 127,144.84 127,144.84 127,252.53 127,252.53 127,435.20 127,435.20 127,523.10 127,523.10 127,328.70 127,328.70
3 Mandor OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87
4 Operator OH 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 302,781.63
5 Pembantu Operator OH 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 189,489.17
6 Sopir OH 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 141,364.93
7 Pembantu Sopir OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
8 Mekanik OH 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 170,439.99
9 Pembantu Mekanik OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
10 Kepala Tukang OH 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 141,364.93
11 Pemasak Aspal OH 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 141,364.93

HARGA SATUAN DASAR ALAT KABUPATEN SIDOARJO TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 445,946.46 498,065.91 445,495.77 497,562.54 444,847.71 496,838.75 444,603.21 496,565.67 444,979.79 496,986.26 445,618.57 497,699.69 445,925.94 498,042.99 445,246.14 905,418.57
2 Asphalt Distribution Unit/Jam 274,574.26 353,466.13 274,296.76 353,108.90 273,897.74 352,595.24 273,747.20 352,401.44 273,979.07 352,699.93 274,372.37 353,206.23 274,561.62 353,449.86 274,143.06 604,204.25
3 Asphalt Finisher Unit/Jam 201,670.06 955,965.22 201,466.24 954,999.07 201,173.17 953,609.86 201,062.60 953,085.71 201,232.90 953,892.99 201,521.77 955,262.32 201,660.77 955,921.22 201,353.35 1,139,034.47
4 Asphalt Liquid Mixer Unit/Jam 71,957.39 131,545.63 71,884.67 131,412.69 71,780.10 131,221.52 71,740.64 131,149.40 71,801.41 131,260.48 71,904.48 131,448.91 71,954.08 131,539.58 71,844.39 197,195.20
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 96,574.39 96,574.39 96,476.79 96,476.79 96,336.45 96,336.45 96,283.50 96,283.50 96,365.05 96,365.05 96,503.38 96,503.38 96,569.95 96,569.95 96,422.73 184,808.62
6 Asphalt Mixing Plant Unit/Jam 1,079,360.87 5,536,552.23 1,078,270.00 5,530,956.67 1,076,701.47 5,522,910.92 1,076,109.67 5,519,875.31 1,077,021.15 5,524,550.71 1,078,567.23 5,532,481.28 1,079,311.18 5,536,297.37 1,077,665.81 6,515,699.71
7 Asphalt Sprayer Unit/Jam 88,999.93 88,999.93 88,909.98 88,909.98 88,780.65 88,780.65 88,731.85 88,731.85 88,807.01 88,807.01 88,934.49 88,934.49 88,995.83 88,995.83 88,860.16 170,313.82
8 Asphalt Tanker Unit/Jam 416,595.42 483,003.44 416,174.39 482,515.29 415,568.99 481,813.38 415,340.58 481,548.56 415,692.37 481,956.44 416,289.11 482,648.29 416,576.25 482,981.20 415,941.19 863,517.37
9 Blending Equipment Unit/Jam 135,393.51 213,887.18 135,256.68 213,671.01 135,059.92 213,360.19 134,985.69 213,242.92 135,100.02 213,423.54 135,293.96 213,729.91 135,387.28 213,877.33 135,180.89 337,464.83
10 Bore Pile Machine Unit/Jam 373,042.27 648,690.69 372,665.25 648,035.08 372,123.14 647,092.40 371,918.61 646,736.73 372,233.63 647,284.53 372,767.97 648,213.71 373,025.09 648,660.83 372,456.43 989,084.11
11 Bore Pile Machine Dia 60 Unit/Jam 244,276.41 738,061.39 244,029.53 737,315.46 243,674.54 736,242.90 243,540.61 735,838.24 243,746.89 736,461.50 244,096.79 737,518.70 244,265.16 738,027.41 243,892.79 960,466.61
12 Bore Pile Machine Dia 80 Unit/Jam 965,743.94 965,743.94 964,767.90 964,767.90 963,364.47 963,364.47 962,834.97 962,834.97 963,650.50 963,650.50 965,033.84 965,033.84 965,699.48 965,699.48 964,227.30 1,848,086.17
13 Bulldozer 100-150 HP Unit/Jam 378,723.11 378,723.11 378,340.35 378,340.35 377,789.99 377,789.99 377,582.34 377,582.34 377,902.16 377,902.16 378,444.64 378,444.64 378,705.68 378,705.68 378,128.35 724,739.67
14 Cement Tanker Unit/Jam 352,212.49 454,886.81 351,856.53 454,427.08 351,344.69 453,766.03 351,151.58 453,516.63 351,449.01 453,900.76 351,953.52 454,552.34 352,196.28 454,865.87 351,659.37 776,520.97
15 Cold Milling Unit/Jam 550,095.32 1,317,692.62 549,539.36 1,316,360.89 548,739.96 1,314,446.01 548,438.35 1,313,723.54 548,902.89 1,314,836.28 549,690.84 1,316,723.74 550,070.00 1,317,631.97 549,231.43 1,819,076.22
16 Cold Recycler Unit/Jam 4,632,730.47 4,632,730.47 4,628,048.36 4,628,048.36 4,621,316.05 4,621,316.05 4,618,776.00 4,618,776.00 4,622,688.16 4,622,688.16 4,629,324.09 4,629,324.09 4,632,517.21 4,632,517.21 4,625,455.07 8,865,378.07
17 Compressor 4000-6500 L\M Unit/Jam 141,074.36 141,074.36 140,931.78 140,931.78 140,726.77 140,726.77 140,649.42 140,649.42 140,768.55 140,768.55 140,970.63 140,970.63 141,067.87 141,067.87 140,852.81 269,965.53
18 Concrete Breaker Unit/Jam 514,116.62 980,065.19 513,597.03 979,074.68 512,849.91 977,650.44 512,568.03 977,113.09 513,002.18 977,940.71 513,738.60 979,344.56 514,092.96 980,020.07 513,309.24 1,449,050.93
19 Concrete Mixer (350) Unit/Jam 95,627.59 95,627.59 95,530.94 95,530.94 95,391.97 95,391.97 95,339.54 95,339.54 95,420.30 95,420.30 95,557.27 95,557.27 95,623.18 95,623.18 95,477.41 182,996.77
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 108,882.89 108,882.89 108,772.85 108,772.85 108,614.62 108,614.62 108,554.92 108,554.92 108,646.87 108,646.87 108,802.83 108,802.83 108,877.88 108,877.88 108,711.90 208,362.66
21 Concrete Pan Mixer Unit/Jam 289,723.18 620,574.06 289,430.37 619,946.88 289,009.34 619,045.05 288,850.49 618,704.80 289,095.15 619,228.85 289,510.15 620,117.76 289,709.84 620,545.50 289,268.19 884,757.15
22 Concrete Pump Unit/Jam 220,606.21 236,982.98 220,383.26 236,743.47 220,062.67 236,399.08 219,941.71 236,269.15 220,128.01 236,469.27 220,444.00 236,808.73 220,596.06 236,972.07 220,259.77 438,511.90
23 Concrete Vibrator Unit/Jam 82,372.28 82,372.28 82,289.03 82,289.03 82,169.32 82,169.32 82,124.16 82,124.16 82,193.72 82,193.72 82,311.71 82,311.71 82,368.49 82,368.49 82,242.92 157,630.88
24 Crane 10-15 Ton Unit/Jam 295,404.03 295,404.03 295,105.47 295,105.47 294,676.19 294,676.19 294,514.23 294,514.23 294,763.68 294,763.68 295,186.82 295,186.82 295,390.43 295,390.43 294,940.12 565,296.95
25 Crane On Track 35 Ton Unit/Jam 245,223.22 465,932.63 244,975.38 465,461.73 244,619.02 464,784.64 244,484.57 464,529.17 244,691.65 464,922.63 245,042.91 465,590.04 245,211.93 465,911.18 244,838.11 689,631.74
26 Crane On Track 75-100 Ton Unit/Jam 385,350.77 584,424.12 384,961.31 583,833.46 384,401.31 582,984.18 384,190.03 582,663.75 384,515.45 583,157.27 385,067.42 583,994.40 385,333.03 584,397.22 384,745.60 936,183.34
27 Dump Truck 10 Ton Unit/Jam 364,521.00 364,521.00 364,152.59 364,152.59 363,622.87 363,622.87 363,423.00 363,423.00 363,730.83 363,730.83 364,252.97 364,252.97 364,504.22 364,504.22 363,948.54 697,561.94
28 Dump Truck 3-4 M3 Unit/Jam 198,829.63 260,078.77 198,628.69 259,815.92 198,339.74 259,437.98 198,230.73 259,295.38 198,398.63 259,515.00 198,683.44 259,887.54 198,820.48 260,066.80 198,517.39 441,641.28
29 Excavator 80-140 HP Unit/Jam 287,829.57 456,895.14 287,538.67 456,433.38 287,120.39 455,769.42 286,962.58 455,518.91 287,205.64 455,904.74 287,617.93 456,559.20 287,816.32 456,874.11 287,377.55 719,602.22
30 Flat Bed Truck 3-4 M3 Unit/Jam 349,372.07 466,936.80 349,018.98 466,464.88 348,511.27 465,786.33 348,319.71 465,530.31 348,614.74 465,924.62 349,115.18 466,593.46 349,355.99 466,915.30 348,823.41 785,952.45
31 Fulvi Mixer Unit/Jam 874,850.39 1,366,668.77 873,966.21 1,365,287.54 872,694.88 1,363,301.48 872,215.21 1,362,552.16 872,953.99 1,363,706.26 874,207.12 1,365,663.88 874,810.12 1,366,605.86 873,476.49 2,165,194.66
32 Generator Set Unit/Jam 389,138.00 412,711.88 388,744.71 412,294.77 388,179.21 411,695.01 387,965.86 411,468.73 388,294.47 411,817.25 388,851.87 412,408.42 389,120.08 412,692.88 388,526.88 768,206.87
33 Hot Recycler Unit/Jam 2,858,412.69 8,381,766.51 2,855,523.81 8,373,295.41 2,851,369.95 8,361,114.98 2,849,802.72 8,356,519.39 2,852,216.54 8,363,597.46 2,856,310.94 8,375,603.52 2,858,281.11 8,381,380.68 2,853,923.74 10,984,652.46
34 Jack Hammer Unit/Jam 53,968.04 53,968.04 53,913.50 53,913.50 53,835.07 53,835.07 53,805.48 53,805.48 53,851.06 53,851.06 53,928.36 53,928.36 53,965.56 53,965.56 53,883.29 103,275.40
35 Launching Gantry Unit/Jam 68,680,489.56 68,680,489.56 68,611,077.08 68,611,077.08 68,511,270.20 68,511,270.20 68,473,613.73 68,473,613.73 68,531,611.72 68,531,611.72 68,629,989.79 68,629,989.79 68,677,328.04 68,677,328.04 68,572,631.44 131,429,728.09
36 Motor Grader > 100 HP Unit/Jam 269,840.22 280,162.08 269,567.50 279,878.93 269,175.37 279,471.80 269,027.42 279,318.19 269,255.29 279,554.77 269,641.81 279,956.08 269,827.80 280,149.18 269,416.45 526,682.67
37 Pedestrian Roller Unit/Jam 88,999.93 88,999.93 88,909.98 88,909.98 88,780.65 88,780.65 88,731.85 88,731.85 88,807.01 88,807.01 88,934.49 88,934.49 88,995.83 88,995.83 88,860.16 170,313.82
38 Pile Driver + Hammer Unit/Jam 101,308.43 296,228.72 101,206.04 295,929.33 101,058.82 295,498.85 101,003.28 295,336.43 101,088.83 295,586.59 101,233.94 296,010.91 101,303.77 296,215.08 101,149.33 388,482.04
39 Rock Drill Breaker Unit/Jam 98,468.01 320,328.68 98,368.49 320,004.94 98,225.40 319,539.44 98,171.41 319,363.81 98,254.56 319,634.31 98,395.61 320,093.15 98,463.48 320,313.94 98,313.37 409,944.57
40 Split Form Paver Unit/Jam 208,297.71 208,297.71 208,087.19 208,087.19 207,784.49 207,784.49 207,670.29 207,670.29 207,846.19 207,846.19 208,144.55 208,144.55 208,288.12 208,288.12 207,970.59 398,606.82
41 Stone Crusher Unit/Jam 557,669.78 694,882.28 557,106.17 694,180.00 556,295.76 693,170.19 555,990.00 692,789.20 556,460.93 693,376.00 557,259.74 694,371.35 557,644.11 694,850.30 556,794.00 1,204,176.19
42 Tamper Unit/Jam 83,319.08 83,319.08 83,234.88 83,234.88 83,113.80 83,113.80 83,068.12 83,068.12 83,138.47 83,138.47 83,257.82 83,257.82 83,315.25 83,315.25 83,188.24 159,442.73
43 Tandem Roller 6-8 T Unit/Jam 402,393.31 469,949.29 401,986.62 469,474.33 401,401.86 468,791.40 401,181.24 468,533.73 401,521.04 468,930.59 402,097.43 469,603.74 402,374.78 469,927.66 401,761.37 837,485.80
44 Three Wheel Roller 6-8 T Unit/Jam 133,499.90 168,699.75 133,364.97 168,529.25 133,170.97 168,284.09 133,097.78 168,191.60 133,210.51 168,334.06 133,401.74 168,575.70 133,493.75 168,691.98 133,290.24 290,615.30
45 Tire Roller 8-10 T Unit/Jam 238,595.56 430,786.85 238,354.42 430,351.47 238,007.69 429,725.45 237,876.88 429,489.26 238,078.36 429,853.04 238,420.12 430,470.10 238,584.58 430,767.02 238,220.86 648,475.46
46 Track Loader 75-100 HP Unit/Jam 223,446.64 294,220.39 223,220.81 293,923.03 222,896.09 293,495.47 222,773.58 293,334.15 222,962.27 293,582.61 223,282.34 294,004.05 223,436.35 294,206.85 223,095.73 498,259.02
47 Trailer 20 Ton Unit/Jam 360,733.76 499,070.08 360,369.19 498,565.69 359,844.97 497,840.44 359,647.18 497,566.81 359,951.81 497,988.25 360,468.52 498,703.12 360,717.16 499,047.11 360,167.26 828,433.61
48 Trailler 15 Ton Unit/Jam 312,446.57 474,970.12 312,130.79 474,490.08 311,676.74 473,799.85 311,505.43 473,539.44 311,769.28 473,940.53 312,216.83 474,620.88 312,432.18 474,948.25 311,955.89 760,178.55
49 Truck Mixer (agitator) Unit/Jam 392,925.23 577,394.96 392,528.12 576,811.41 391,957.11 575,972.34 391,741.68 575,655.76 392,073.49 576,143.35 392,636.32 576,970.41 392,907.14 577,368.38 392,308.17 936,097.45
50 Vibrating Rammer Unit/Jam 80,478.66 80,478.66 80,397.32 80,397.32 80,280.37 80,280.37 80,236.25 80,236.25 80,304.21 80,304.21 80,419.49 80,419.49 80,474.96 80,474.96 80,352.27 154,007.18
51 Vibratory Roller 5-8 T Unit/Jam 194,095.59 236,982.98 193,899.43 236,743.47 193,617.37 236,399.08 193,510.95 236,269.15 193,674.86 236,469.27 193,952.88 236,808.73 194,086.66 236,972.07 193,790.78 414,249.11
52 Water Pump 70-100 MM Unit/Jam 60,595.70 60,595.70 60,534.46 60,534.46 60,446.40 60,446.40 60,413.17 60,413.17 60,464.35 60,464.35 60,551.14 60,551.14 60,592.91 60,592.91 60,500.54 115,958.35
53 Water Tanker 3000-4500 L Unit/Jam 219,659.40 219,659.40 219,437.40 219,437.40 219,118.19 219,118.19 218,997.76 218,997.76 219,183.25 219,183.25 219,497.89 219,497.89 219,649.29 219,649.29 219,314.44 420,349.01
54 Welding Set Unit/Jam 123,085.01 123,085.01 122,960.61 122,960.61 122,781.75 122,781.75 122,714.26 122,714.26 122,818.20 122,818.20 122,994.51 122,994.51 123,079.35 123,079.35 122,891.71 235,540.39
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 213,978.56 284,178.74 213,762.30 283,891.53 213,451.34 283,478.56 213,334.02 283,322.75 213,514.72 283,562.73 213,821.22 283,969.79 213,968.71 284,165.66 213,642.52 479,567.85
HARGA SATUAN DASAR BAHAN KABUPATEN SIDOARJO TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
2 Agregat Pecah Mesin 20-30 mm M3 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 543,815.78
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 325,349.51 325,349.51 325,020.69 325,020.69 324,547.89 324,547.89 324,369.51 324,369.51 324,644.25 324,644.25 325,110.28 325,110.28 325,334.53 325,334.53 324,838.57 622,601.82
4 Bahan Agr. Base Kelas A M3 312,295.36 312,295.36 311,979.74 311,979.74 311,525.91 311,525.91 311,354.68 311,354.68 311,618.40 311,618.40 312,065.74 312,065.74 312,280.99 312,280.99 311,804.92 597,620.88
5 Bahan Agr. Base Kelas B M3 293,216.22 293,216.22 292,919.88 292,919.88 292,493.78 292,493.78 292,333.01 292,333.01 292,580.62 292,580.62 293,000.63 293,000.63 293,202.73 293,202.73 292,755.75 561,110.28
6 Bahan Agr. Base Kelas C M3 270,120.43 270,120.43 269,847.43 269,847.43 269,454.89 269,454.89 269,306.78 269,306.78 269,534.89 269,534.89 269,921.81 269,921.81 270,107.99 270,107.99 269,696.22 516,913.24
7 Bahan Agr. Base Kelas C2 M3 246,020.46 246,020.46 245,771.82 245,771.82 245,414.30 245,414.30 245,279.41 245,279.41 245,487.17 245,487.17 245,839.57 245,839.57 246,009.14 246,009.14 245,634.10 470,794.58
8 Bahan Agr. Base Kelas S M3 199,828.87 199,828.87 199,626.91 199,626.91 199,336.51 199,336.51 199,226.95 199,226.95 199,395.70 199,395.70 199,681.93 199,681.93 199,819.67 199,819.67 199,515.05 382,400.50
9 Bahan Pilihan M3 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
10 Bahan Tanah Timbunan M3 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 217,141.99
11 Batu Belah/Kerakal M3 321,332.85 321,332.85 321,008.09 321,008.09 320,541.13 320,541.13 320,364.95 320,364.95 320,636.30 320,636.30 321,096.58 321,096.58 321,318.06 321,318.06 320,828.22 614,915.37
12 Batu Kali M3 353,466.13 353,466.13 353,108.90 353,108.90 352,595.24 352,595.24 352,401.44 352,401.44 352,699.93 352,699.93 353,206.23 353,206.23 353,449.86 353,449.86 352,911.04 676,406.91
13 Chipping M3 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97 210,543.52 403,538.21
14 Chipping (kg) Kg 311.29 311.29 310.98 310.98 310.52 310.52 310.35 310.35 310.62 310.62 311.06 311.06 311.28 311.28 310.80 595.70
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 6,024.99 6,024.99 6,018.90 6,018.90 6,010.15 6,010.15 6,006.84 6,006.84 6,011.93 6,011.93 6,020.56 6,020.56 6,024.71 6,024.71 6,015.53 11,529.66
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 377,566.10 377,566.10 377,184.51 377,184.51 376,635.83 376,635.83 376,428.81 376,428.81 376,747.65 376,747.65 377,288.48 377,288.48 377,548.72 377,548.72 376,973.15 722,525.56
18 Kapur M3 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
19 Pasir Beton (Kasar) M3 449,865.99 449,865.99 449,411.33 449,411.33 448,757.58 448,757.58 448,510.92 448,510.92 448,890.82 448,890.82 449,535.21 449,535.21 449,845.28 449,845.28 449,159.50 860,881.52
20 Pasir Halus (untuk HRS) M3 284,178.74 284,178.74 283,891.53 283,891.53 283,478.56 283,478.56 283,322.75 283,322.75 283,562.73 283,562.73 283,969.79 283,969.79 284,165.66 284,165.66 283,732.45 543,815.78
21 Pasir Pasang (Sedang) M3 318,320.35 318,320.35 317,998.64 317,998.64 317,536.05 317,536.05 317,361.52 317,361.52 317,630.33 317,630.33 318,086.30 318,086.30 318,305.70 318,305.70 317,820.45 609,150.54
22 Pasir Urug M3 192,799.71 192,799.71 192,604.85 192,604.85 192,324.68 192,324.68 192,218.97 192,218.97 192,381.78 192,381.78 192,657.95 192,657.95 192,790.83 192,790.83 192,496.93 368,949.22
23 Pasir Urug (ada unsur lempung) M3 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
24 Sirtu M3 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
26 Anti Pengelupas Liter 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30 95,245.88 182,553.00
27 Arbocell Kg 134,558.13 134,558.13 134,422.14 134,422.14 134,226.60 134,226.60 134,152.82 134,152.82 134,266.45 134,266.45 134,459.19 134,459.19 134,551.94 134,551.94 134,346.82 257,495.81
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
30 Aspal Emulsi (CSS-1) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
31 Aspal Minyak (Drum) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
37 Assetilline Botol 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48 147,380.46 282,476.75
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 558,616.59 558,616.59 558,052.02 558,052.02 557,240.24 557,240.24 556,933.95 556,933.95 557,405.68 557,405.68 558,205.85 558,205.85 558,590.88 558,590.88 557,739.32 1,068,991.02
41 Beton K-125 (fc' 10 MPa) M3 577,552.75 577,552.75 576,969.04 576,969.04 576,129.73 576,129.73 575,813.07 575,813.07 576,300.79 576,300.79 577,128.08 577,128.08 577,526.16 577,526.16 576,645.74 1,105,228.00
42 Beton K-175 (fc' 15 MPa) M3 624,893.13 624,893.13 624,261.58 624,261.58 623,353.48 623,353.48 623,010.86 623,010.86 623,538.56 623,538.56 624,433.66 624,433.66 624,864.37 624,864.37 623,911.78 1,195,820.46
43 Beton K-250 (fc' 20 MPa) M3 695,903.72 695,903.72 695,200.40 695,200.40 694,189.11 694,189.11 693,807.55 693,807.55 694,395.22 694,395.22 695,392.03 695,392.03 695,871.68 695,871.68 694,810.85 1,331,709.15
44 Beton K-300 (fc' 25 MPa) M3 724,307.95 724,307.95 723,575.92 723,575.92 722,523.36 722,523.36 722,126.23 722,126.23 722,737.88 722,737.88 723,775.38 723,775.38 724,274.61 724,274.61 723,170.47 1,386,064.63
45 Beton K-350 (fc' 30 MPa) M3 752,712.19 752,712.19 751,951.45 751,951.45 750,857.60 750,857.60 750,444.90 750,444.90 751,080.54 751,080.54 752,158.73 752,158.73 752,677.54 752,677.54 751,530.10 1,440,420.10
46 Beton K-400 (fc' 35 MPa) M3 781,116.42 781,116.42 780,326.98 780,326.98 779,191.85 779,191.85 778,763.58 778,763.58 779,423.20 779,423.20 780,542.08 780,542.08 781,080.46 781,080.46 779,889.73 1,494,775.58
47 Beton K-450 (fc' 40 MPa) M3 818,988.73 818,988.73 818,161.01 818,161.01 816,970.85 816,970.85 816,521.81 816,521.81 817,213.42 817,213.42 818,386.54 818,386.54 818,951.03 818,951.03 817,702.56 1,567,249.55
48 Beton K-500 (fc' 45 MPa) M3 852,127.00 852,127.00 851,265.79 851,265.79 850,027.48 850,027.48 849,560.27 849,560.27 850,279.86 850,279.86 851,500.45 851,500.45 852,087.78 852,087.78 850,788.79 1,630,664.27
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 61,254.07 61,254.07 61,192.17 61,192.17 61,103.15 61,103.15 61,069.57 61,069.57 61,121.29 61,121.29 61,209.03 61,209.03 61,251.25 61,251.25 61,157.88 117,218.24
51 Cat Anti Karat Kg 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21 69,178.58 132,591.13
52 Cat Marka (Non Thermoplas) Kg 54,224.92 54,224.92 54,170.12 54,170.12 54,091.32 54,091.32 54,061.58 54,061.58 54,107.38 54,107.38 54,185.05 54,185.05 54,222.42 54,222.42 54,139.76 103,766.97
53 Cat Marka (Thermoplastic) Kg 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,235,123.14 1,235,123.14 1,233,874.85 1,233,874.85 1,232,079.96 1,232,079.96 1,231,402.76 1,231,402.76 1,232,445.77 1,232,445.77 1,234,214.97 1,234,214.97 1,235,066.28 1,235,066.28 1,233,183.46 2,363,580.97
57 Curing Compound Liter 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 577,394.96 577,394.96 576,811.41 576,811.41 575,972.34 575,972.34 575,655.76 575,655.76 576,143.35 576,143.35 576,970.41 576,970.41 577,368.38 577,368.38 576,488.20 1,104,926.06
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 671,786.49 671,786.49 671,107.54 671,107.54 670,131.30 670,131.30 669,762.97 669,762.97 670,330.26 670,330.26 671,292.53 671,292.53 671,755.56 671,755.56 670,731.49 1,285,557.45
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 852,536.21 852,536.21 851,674.59 851,674.59 850,435.68 850,435.68 849,968.25 849,968.25 850,688.18 850,688.18 851,909.36 851,909.36 852,496.97 852,496.97 851,197.36 1,631,447.35
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
64 Oxygen (Isi 6 M3) Botol 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,306,418.86 1,306,418.86 1,305,098.52 1,305,098.52 1,303,200.02 1,303,200.02 1,302,483.73 1,302,483.73 1,303,586.95 1,303,586.95 1,305,458.27 1,305,458.27 1,306,358.72 1,306,358.72 1,304,367.22 2,500,015.31
67 Seal Coat M2 104,433.18 104,433.18 104,327.63 104,327.63 104,175.87 104,175.87 104,118.61 104,118.61 104,206.80 104,206.80 104,356.39 104,356.39 104,428.37 104,428.37 104,269.17 199,847.50
68 Seal Guard Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
69 Semen/PC (50 kg) Zak 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
78 Baja Tulangan (Polos) U32 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
79 Baja Tulangan (Polos) U36 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
80 Baja Tulangan (Ulir) D16 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
81 Baja Tulangan (Ulir) D19 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
84 Baja Tulangan (Ulir) D36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
85 Besi Beton Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,308,052.25 12,308,052.25 12,295,613.02 12,295,613.02 12,277,726.89 12,277,726.89 12,270,978.57 12,270,978.57 12,281,372.24 12,281,372.24 12,299,002.32 12,299,002.32 12,307,485.68 12,307,485.68 12,288,723.28 23,553,180.41
87 Box Culvert Type DUB 200×200 M' 13,066,196.94 13,066,196.94 13,052,991.49 13,052,991.49 13,034,003.61 13,034,003.61 13,026,839.62 13,026,839.62 13,037,873.51 13,037,873.51 13,056,589.56 13,056,589.56 13,065,595.47 13,065,595.47 13,045,677.35 25,003,996.36
88 Box Culvert Type uk 300×200 M' 14,107,516.20 14,107,516.20 14,093,258.33 14,093,258.33 14,072,757.21 14,072,757.21 14,065,022.27 14,065,022.27 14,076,935.52 14,076,935.52 14,097,143.15 14,097,143.15 14,106,866.80 14,106,866.80 14,085,361.29 26,996,706.50
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 183,762.22 183,762.22 183,576.50 183,576.50 183,309.46 183,309.46 183,208.70 183,208.70 183,363.88 183,363.88 183,627.10 183,627.10 183,753.76 183,753.76 183,473.64 351,654.73
91 Ducting (Strand Prestress) M' 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,060,546.89 2,060,546.89 2,058,464.38 2,058,464.38 2,055,469.98 2,055,469.98 2,054,340.22 2,054,340.22 2,056,080.27 2,056,080.27 2,059,031.80 2,059,031.80 2,060,452.04 2,060,452.04 2,057,310.94 3,943,144.83
94 Expansion Join Tipe Rubber M' 1,491,185.25 1,491,185.25 1,489,678.17 1,489,678.17 1,487,511.17 1,487,511.17 1,486,693.58 1,486,693.58 1,487,952.83 1,487,952.83 1,490,088.80 1,490,088.80 1,491,116.61 1,491,116.61 1,488,843.44 2,853,591.65
95 Expansion Join Tipe Torma M' 1,711,097.42 1,711,097.42 1,709,368.08 1,709,368.08 1,706,881.51 1,706,881.51 1,705,943.34 1,705,943.34 1,707,388.29 1,707,388.29 1,709,839.27 1,709,839.27 1,711,018.65 1,711,018.65 1,708,410.25 3,274,424.36
96 Expansion Tipe Joint Asphaltic Plug M' 2,029,417.77 2,029,417.77 2,027,366.72 2,027,366.72 2,024,417.56 2,024,417.56 2,023,304.86 2,023,304.86 2,025,018.63 2,025,018.63 2,027,925.57 2,027,925.57 2,029,324.35 2,029,324.35 2,026,230.70 3,883,574.90
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
99 Glass Bead Kg 66,274.90 66,274.90 66,207.92 66,207.92 66,111.61 66,111.61 66,075.27 66,075.27 66,131.24 66,131.24 66,226.17 66,226.17 66,271.85 66,271.85 66,170.82 126,826.30
100 Joint Sealent Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
101 Joint Socket Pile 16×16×16 Set 86,358.20 86,358.20 86,270.92 86,270.92 86,145.43 86,145.43 86,098.08 86,098.08 86,171.01 86,171.01 86,294.71 86,294.71 86,354.23 86,354.23 86,222.58 165,258.51
102 Joint Socket Pile 35×35 Set 740,069.72 740,069.72 739,321.76 739,321.76 738,246.29 738,246.29 737,840.52 737,840.52 738,465.48 738,465.48 739,525.55 739,525.55 740,035.65 740,035.65 738,907.49 1,416,226.97
103 Kawat Beton Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
104 Kawat Bronjong Kg 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
105 Kawat Las Dos 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
106 Kayu Acuan (Kelas III/Meranti) M3 4,070,885.52 4,070,885.52 4,066,771.25 4,066,771.25 4,060,855.41 4,060,855.41 4,058,623.41 4,058,623.41 4,062,061.11 4,062,061.11 4,067,892.26 4,067,892.26 4,070,698.13 4,070,698.13 4,064,492.47 7,790,209.13
107 Kayu Perancah (Gelam) M3 2,622,879.37 2,622,879.37 2,620,228.54 2,620,228.54 2,616,416.96 2,616,416.96 2,614,978.87 2,614,978.87 2,617,193.79 2,617,193.79 2,620,950.81 2,620,950.81 2,622,758.64 2,622,758.64 2,618,760.32 5,019,246.73
108 Kerb Pracetak Type 1 (Peninggi) Buah 52,216.59 52,216.59 52,163.81 52,163.81 52,087.93 52,087.93 52,059.30 52,059.30 52,103.40 52,103.40 52,178.19 52,178.19 52,214.18 52,214.18 52,134.59 99,923.75
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
110 Marmer Nama Jembatan Buah 568,357.48 568,357.48 567,783.06 567,783.06 566,957.12 566,957.12 566,645.50 566,645.50 567,125.45 567,125.45 567,939.57 567,939.57 568,331.31 568,331.31 567,464.91 1,087,631.57
111 Mata Kucing Buah 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
112 Matras Concrete (Tebal=10 cm) M2 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
113 Mini Pile 16×16×16 M' 128,533.14 128,533.14 128,403.24 128,403.24 128,216.45 128,216.45 128,145.98 128,145.98 128,254.52 128,254.52 128,438.63 128,438.63 128,527.22 128,527.22 128,331.29 245,966.15
114 Mini Timber Pile Buah 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
115 Multipleks 12 mm Lbr 137,570.63 137,570.63 137,431.59 137,431.59 137,231.67 137,231.67 137,156.24 137,156.24 137,272.42 137,272.42 137,469.47 137,469.47 137,564.29 137,564.29 137,354.58 263,260.64
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 90,374.86 90,374.86 90,283.53 90,283.53 90,152.19 90,152.19 90,102.64 90,102.64 90,178.96 90,178.96 90,308.41 90,308.41 90,370.70 90,370.70 90,232.94 172,944.95
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 62,942,075.82 62,942,075.82 62,878,462.91 62,878,462.91 62,786,995.12 62,786,995.12 62,752,484.94 62,752,484.94 62,805,637.07 62,805,637.07 62,895,795.42 62,895,795.42 62,939,178.44 62,939,178.44 62,843,229.49 120,448,470.34
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 89,167,857.06 89,167,857.06 89,077,738.85 89,077,738.85 88,948,159.61 88,948,159.61 88,899,270.23 88,899,270.23 88,974,569.01 88,974,569.01 89,102,293.23 89,102,293.23 89,163,752.45 89,163,752.45 89,027,824.89 170,635,172.85
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 170,424,901.06 170,424,901.06 170,252,659.78 170,252,659.78 170,004,997.33 170,004,997.33 169,911,555.95 169,911,555.95 170,055,473.14 170,055,473.14 170,299,590.10 170,299,590.10 170,417,056.00 170,417,056.00 170,157,260.13 326,131,897.86
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 223,485,991.80 223,485,991.80 223,260,123.90 223,260,123.90 222,935,352.77 222,935,352.77 222,812,818.79 222,812,818.79 223,001,544.01 223,001,544.01 223,321,665.78 223,321,665.78 223,475,704.20 223,475,704.20 223,135,021.96 427,671,720.47
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 284,885,669.94 284,885,669.94 284,597,747.97 284,597,747.97 284,183,750.48 284,183,750.48 284,027,551.99 284,027,551.99 284,268,126.84 284,268,126.84 284,676,197.64 284,676,197.64 284,872,555.97 284,872,555.97 284,438,276.01 545,168,597.02
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 343,713,681.14 343,713,681.14 343,366,304.16 343,366,304.16 342,866,817.47 342,866,817.47 342,678,364.48 342,678,364.48 342,968,617.29 342,968,617.29 343,460,953.45 343,460,953.45 343,697,859.18 343,697,859.18 343,173,901.74 657,744,228.98
124 Pelat Rambu (Eng. Grade) Buah 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
125 Pelat Rambu (High L Grade) Buah 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 260,078.77 260,078.77 259,815.92 259,815.92 259,437.98 259,437.98 259,295.38 259,295.38 259,515.00 259,515.00 259,887.54 259,887.54 260,066.80 260,066.80 259,670.34 497,697.13
129 Pipa Galvanis Dia 1,5" M' 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
130 Pipa Galvanis Dia 2" M' 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
131 Pipa Galvanis Dia 3" M' 227,945.49 227,945.49 227,715.11 227,715.11 227,383.86 227,383.86 227,258.88 227,258.88 227,451.37 227,451.37 227,777.88 227,777.88 227,935.00 227,935.00 227,587.52 436,205.59
132 Pipa Porus M' 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
133 Pipa PVC Dia 4" M' 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 215,220.38
134 Plastik Filter M2 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
135 Rel Pengaman M' 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,945,067.90 1,945,067.90 1,943,102.10 1,943,102.10 1,940,275.51 1,940,275.51 1,939,209.06 1,939,209.06 1,940,851.60 1,940,851.60 1,943,637.72 1,943,637.72 1,944,978.36 1,944,978.36 1,942,013.30 3,722,159.62
137 Strip Bearing Buah 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
138 Tiang Pancang Baja Diameter 400 M' 688,857.29 688,857.29 688,161.09 688,161.09 687,160.04 687,160.04 686,782.35 686,782.35 687,364.07 687,364.07 688,350.79 688,350.79 688,825.58 688,825.58 687,775.49 1,318,224.83
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 842,494.56 842,494.56 841,643.09 841,643.09 840,418.77 840,418.77 839,956.84 839,956.84 840,668.30 840,668.30 841,875.09 841,875.09 842,455.78 842,455.78 841,171.48 1,612,231.24
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,704,068.26 1,704,068.26 1,702,346.03 1,702,346.03 1,699,869.67 1,699,869.67 1,698,935.35 1,698,935.35 1,700,374.37 1,700,374.37 1,702,815.28 1,702,815.28 1,703,989.82 1,703,989.82 1,701,392.14 3,260,973.09
HARGA SATUAN DASAR UPAH KABUPATEN GRESIK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
2 Tukang OH 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
3 Mandor OH 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
4 Operator OH 328,000 328,000 328,887.45 328,887.45 329,340.85 329,340.85 329,350.02 329,350.02 328,915.03 328,915.03 328,445.21 328,445.21 328,374.11 328,374.11 328,759.60 328,759.60 329,237.72 329,237.72
5 Pembantu Operator OH 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82 205,474.75 205,474.75 205,773.58 205,773.58
6 Sopir OH 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
7 Pembantu Sopir OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
8 Mekanik OH 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
9 Pembantu Mekanik OH 133,000 133,000 133,359.85 133,359.85 133,543.70 133,543.70 133,547.42 133,547.42 133,371.04 133,371.04 133,180.53 133,180.53 133,151.70 133,151.70 133,308.01 133,308.01 133,501.88 133,501.88
10 Kepala Tukang OH 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
11 Pemasak Aspal OH 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13

HARGA SATUAN DASAR ALAT KABUPATEN GRESIK TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 482,957 539,000 484,263.72 540,458.35 484,931.32 541,203.42 484,944.82 541,218.48 484,304.33 540,503.67 483,612.54 539,731.61 483,507.85 539,614.77 484,075.46 540,248.24 484,779.47 541,033.94
2 Asphalt Distribution Unit/Jam 297,362 382,000 298,166.62 383,033.56 298,577.67 383,561.61 298,585.98 383,572.28 298,191.63 383,065.68 297,765.69 382,518.50 297,701.23 382,435.70 298,050.71 382,884.65 298,484.17 383,441.50
3 Asphalt Finisher Unit/Jam 218,407 1,036,000 218,998.24 1,038,803.06 219,300.15 1,040,235.14 219,306.26 1,040,264.10 219,016.61 1,038,890.17 218,703.76 1,037,406.20 218,656.42 1,037,181.63 218,913.11 1,038,399.21 219,231.48 1,039,909.39
4 Asphalt Liquid Mixer Unit/Jam 77,929 143,000 78,140.22 143,386.91 78,247.94 143,584.58 78,250.12 143,588.58 78,146.77 143,398.93 78,035.15 143,194.10 78,018.25 143,163.10 78,109.84 143,331.17 78,223.44 143,539.62
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 104,589 104,589 104,872.40 104,872.40 105,016.97 105,016.97 105,019.90 105,019.90 104,881.19 104,881.19 104,731.38 104,731.38 104,708.71 104,708.71 104,831.63 104,831.63 104,984.09 104,984.09
6 Asphalt Mixing Plant Unit/Jam 1,168,941 5,996,049 1,172,103.27 6,012,271.87 1,173,719.12 6,020,560.32 1,173,751.80 6,020,727.92 1,172,201.56 6,012,776.05 1,170,527.18 6,004,187.32 1,170,273.79 6,002,887.57 1,171,647.60 6,009,934.53 1,173,351.58 6,018,675.01
7 Asphalt Sprayer Unit/Jam 96,386 96,386 96,647.11 96,647.11 96,780.35 96,780.35 96,783.04 96,783.04 96,655.22 96,655.22 96,517.15 96,517.15 96,496.26 96,496.26 96,609.54 96,609.54 96,750.04 96,750.04
8 Asphalt Tanker Unit/Jam 451,170 523,000 452,390.74 524,415.06 453,014.40 525,138.01 453,027.01 525,152.63 452,428.67 524,459.03 451,782.42 523,709.89 451,684.62 523,596.52 452,214.86 524,211.18 452,872.54 524,973.57
9 Blending Equipment Unit/Jam 146,630 232,000 147,026.99 232,627.71 147,229.68 232,948.41 147,233.78 232,954.89 147,039.32 232,647.22 146,829.29 232,314.90 146,797.50 232,264.61 146,969.83 232,537.27 147,183.58 232,875.46
10 Bore Pile Machine Unit/Jam 404,002 702,000 405,095.34 703,899.37 405,653.80 704,869.76 405,665.09 704,889.38 405,129.31 703,958.40 404,550.62 702,952.85 404,463.05 702,800.68 404,937.86 703,625.72 405,526.77 704,649.03
11 Bore Pile Machine Dia 60 Unit/Jam 264,550 800,000 265,265.48 802,164.52 265,631.17 803,270.38 265,638.56 803,292.74 265,287.72 802,231.79 264,908.78 801,085.87 264,851.44 800,912.46 265,162.35 801,852.67 265,547.99 803,018.84
12 Bore Pile Machine Dia 80 Unit/Jam 1,045,894 1,045,894 1,048,723.98 1,048,723.98 1,050,169.74 1,050,169.74 1,050,198.97 1,050,198.97 1,048,811.93 1,048,811.93 1,047,313.79 1,047,313.79 1,047,087.07 1,047,087.07 1,048,316.28 1,048,316.28 1,049,840.89 1,049,840.89
13 Bulldozer 100-150 HP Unit/Jam 410,155 595,000 411,264.31 596,609.86 411,831.27 597,432.34 411,842.74 597,448.97 411,298.79 596,659.89 410,711.29 595,807.62 410,622.38 595,678.64 411,104.42 596,377.92 411,702.31 597,245.26
14 Cement Tanker Unit/Jam 381,444 492,000 382,475.81 493,331.18 383,003.08 494,011.28 383,013.74 494,025.03 382,507.88 493,372.55 381,961.50 492,667.81 381,878.81 492,561.16 382,327.11 493,139.39 382,883.15 493,856.59
15 Cold Milling Unit/Jam 595,750 1,268,000 597,361.41 1,271,430.77 598,184.92 1,273,183.55 598,201.57 1,273,218.99 597,411.50 1,271,537.39 596,558.15 1,269,721.11 596,429.01 1,269,446.25 597,129.17 1,270,936.48 597,997.60 1,272,784.86
16 Cold Recycler Unit/Jam 5,017,216 5,017,216 5,030,790.63 5,030,790.63 5,037,726.02 5,037,726.02 5,037,866.26 5,037,866.26 5,031,212.51 5,031,212.51 5,024,025.86 5,024,025.86 5,022,938.28 5,022,938.28 5,028,834.85 5,028,834.85 5,036,148.49 5,036,148.49
17 Compressor 4000-6500 L\M Unit/Jam 152,783 152,783 153,195.95 153,195.95 153,407.15 153,407.15 153,411.42 153,411.42 153,208.80 153,208.80 152,989.96 152,989.96 152,956.84 152,956.84 153,136.40 153,136.40 153,359.11 153,359.11
18 Concrete Breaker Unit/Jam 556,785 1,061,000 558,291.30 1,063,870.70 559,060.95 1,065,337.34 559,076.51 1,065,366.99 558,338.11 1,063,959.91 557,540.58 1,062,440.14 557,419.88 1,062,210.15 558,074.25 1,063,457.11 558,885.88 1,065,003.73
19 Concrete Mixer (350) Unit/Jam 103,564 103,564 103,844.24 103,844.24 103,987.40 103,987.40 103,990.29 103,990.29 103,852.95 103,852.95 103,704.60 103,704.60 103,682.15 103,682.15 103,803.87 103,803.87 103,954.83 103,954.83
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 117,919 117,919 118,238.49 118,238.49 118,401.49 118,401.49 118,404.79 118,404.79 118,248.40 118,248.40 118,079.50 118,079.50 118,053.93 118,053.93 118,192.52 118,192.52 118,364.41 118,364.41
21 Concrete Pan Mixer Unit/Jam 313,768 672,000 314,617.19 673,818.20 315,050.92 674,747.12 315,059.69 674,765.90 314,643.58 673,874.70 314,194.14 672,912.13 314,126.12 672,766.46 314,494.88 673,556.24 314,952.27 674,535.82
22 Concrete Pump Unit/Jam 238,915 256,000 239,561.46 256,692.65 239,891.72 257,046.52 239,898.39 257,053.68 239,581.55 256,714.17 239,239.33 256,347.48 239,187.54 256,291.99 239,468.33 256,592.85 239,816.59 256,966.03
23 Concrete Vibrator Unit/Jam 89,209 89,209 89,449.99 89,449.99 89,573.30 89,573.30 89,575.79 89,575.79 89,457.49 89,457.49 89,329.71 89,329.71 89,310.37 89,310.37 89,415.21 89,415.21 89,545.25 89,545.25
24 Crane 10-15 Ton Unit/Jam 319,921 319,921 320,786.16 320,786.16 321,228.39 321,228.39 321,237.33 321,237.33 320,813.06 320,813.06 320,354.81 320,354.81 320,285.46 320,285.46 320,661.45 320,661.45 321,127.80 321,127.80
25 Crane On Track 35 Ton Unit/Jam 265,575 504,000 266,293.64 505,363.65 266,660.75 506,060.34 266,668.17 506,074.43 266,315.97 505,406.03 265,935.56 504,684.10 265,877.99 504,574.85 266,190.11 505,167.18 266,577.24 505,901.87
26 Crane On Track 75-100 Ton Unit/Jam 417,332 633,000 418,461.43 634,712.68 419,038.32 635,587.69 419,049.98 635,605.38 418,496.52 634,765.90 417,898.74 633,859.20 417,808.27 633,721.98 418,298.75 634,465.93 418,907.10 635,388.66
27 Dump Truck 10 Ton Unit/Jam 394,774 425,000 395,841.90 426,149.90 396,387.60 426,737.39 396,398.63 426,749.27 395,875.09 426,185.64 395,309.62 425,576.87 395,224.04 425,484.74 395,688.01 425,984.23 396,263.47 426,603.76
28 Dump Truck 3-4 M3 Unit/Jam 215,331 282,000 215,913.76 282,762.99 216,211.42 283,152.81 216,217.44 283,160.69 215,931.87 282,786.71 215,623.43 282,382.77 215,576.75 282,321.64 215,829.82 282,653.07 216,143.71 283,064.14
29 Excavator 80-140 HP Unit/Jam 311,717 495,000 312,560.87 496,339.30 312,991.77 497,023.55 313,000.48 497,037.38 312,587.08 496,380.92 312,140.58 495,671.88 312,073.01 495,564.58 312,439.36 496,146.34 312,893.75 496,867.91
30 Flat Bed Truck 3-4 M3 Unit/Jam 378,368 506,000 379,391.32 507,369.06 379,914.35 508,068.51 379,924.92 508,082.66 379,423.14 507,411.61 378,881.17 506,686.81 378,799.15 506,577.13 379,243.83 507,171.81 379,795.38 507,909.41
31 Fulvi Mixer Unit/Jam 947,457 1,480,000 950,020.55 1,484,004.37 951,330.24 1,486,050.20 951,356.72 1,486,091.57 950,100.22 1,484,128.81 948,743.08 1,482,008.86 948,537.70 1,481,688.05 949,651.22 1,483,427.44 951,032.33 1,485,584.85
32 Generator Set Unit/Jam 421,434 447,000 422,574.08 448,209.43 423,156.63 448,827.32 423,168.41 448,839.82 422,609.51 448,247.01 422,005.85 447,606.73 421,914.50 447,509.84 422,409.79 448,035.18 423,024.12 448,686.78
33 Hot Recycler Unit/Jam 3,095,642 9,078,000 3,104,017.35 9,102,561.92 3,108,296.52 9,115,110.61 3,108,383.04 9,115,364.35 3,104,277.65 9,103,325.25 3,099,843.46 9,090,321.94 3,099,172.42 9,088,354.12 3,102,810.63 9,099,023.19 3,107,323.17 9,112,256.26
34 Jack Hammer Unit/Jam 58,447 58,447 58,605.16 58,605.16 58,685.96 58,685.96 58,687.59 58,687.59 58,610.08 58,610.08 58,526.36 58,526.36 58,513.69 58,513.69 58,582.38 58,582.38 58,667.58 58,667.58
35 Launching Gantry Unit/Jam 74,380,506 74,380,506 74,581,753.85 74,581,753.85 74,684,571.40 74,684,571.40 74,686,650.43 74,686,650.43 74,588,008.17 74,588,008.17 74,481,465.68 74,481,465.68 74,465,342.34 74,465,342.34 74,552,759.30 74,552,759.30 74,661,184.34 74,661,184.34
36 Motor Grader > 100 HP Unit/Jam 292,235 491,000 293,025.82 492,328.48 293,429.78 493,007.19 293,437.95 493,020.92 293,050.39 492,369.76 292,631.79 491,666.45 292,568.45 491,560.02 292,911.90 492,137.08 293,337.89 492,852.81
37 Pedestrian Roller Unit/Jam 96,386 96,386 96,647.11 96,647.11 96,780.35 96,780.35 96,783.04 96,783.04 96,655.22 96,655.22 96,517.15 96,517.15 96,496.26 96,496.26 96,609.54 96,609.54 96,750.04 96,750.04
38 Pile Driver + Hammer Unit/Jam 109,716 321,000 110,013.20 321,868.51 110,164.86 322,312.24 110,167.93 322,321.21 110,022.43 321,895.51 109,865.27 321,435.71 109,841.49 321,366.12 109,970.43 321,743.38 110,130.37 322,211.31
39 Rock Drill Breaker Unit/Jam 106,640 347,000 106,928.72 347,938.86 107,076.13 348,418.53 107,079.11 348,428.23 106,937.69 347,968.04 106,784.94 347,471.00 106,761.82 347,395.78 106,887.15 347,803.60 107,042.60 348,309.42
40 Split Form Paver Unit/Jam 225,585 225,585 226,195.37 226,195.37 226,507.20 226,507.20 226,513.50 226,513.50 226,214.34 226,214.34 225,891.21 225,891.21 225,842.31 225,842.31 226,107.43 226,107.43 226,436.27 226,436.27
41 Stone Crusher Unit/Jam 603,953 753,000 605,586.69 755,037.36 606,421.55 756,078.24 606,438.43 756,099.29 605,637.48 755,100.67 604,772.37 754,022.08 604,641.46 753,858.85 605,351.26 754,743.83 606,231.65 755,841.48
42 Tamper Unit/Jam 90,234 90,234 90,478.15 90,478.15 90,602.88 90,602.88 90,605.40 90,605.40 90,485.73 90,485.73 90,356.48 90,356.48 90,336.92 90,336.92 90,442.97 90,442.97 90,574.51 90,574.51
43 Tandem Roller 6-8 T Unit/Jam 435,789 509,000 436,968.33 510,377.18 437,570.73 511,080.78 437,582.91 511,095.00 437,004.97 510,419.98 436,380.75 509,690.89 436,286.28 509,580.55 436,798.45 510,178.76 437,433.70 510,920.74
44 Three Wheel Roller 6-8 T Unit/Jam 144,579 183,000 144,970.67 183,495.13 145,170.52 183,748.10 145,174.56 183,753.21 144,982.83 183,510.52 144,775.73 183,248.39 144,744.39 183,208.72 144,914.31 183,423.80 145,125.06 183,690.56
45 Tire Roller 8-10 T Unit/Jam 258,397 467,000 259,096.51 468,263.54 259,453.70 468,909.08 259,460.92 468,922.14 259,118.24 468,302.81 258,748.11 467,633.88 258,692.10 467,532.65 258,995.79 468,081.50 259,372.45 468,762.25
46 Track Loader 75-100 HP Unit/Jam 241,991 319,000 242,645.94 319,863.10 242,980.45 320,304.06 242,987.21 320,312.98 242,666.29 319,889.93 242,319.66 319,432.99 242,267.21 319,363.84 242,551.61 319,738.75 242,904.36 320,203.76
47 Trailer 20 Ton Unit/Jam 390,672 540,000 391,729.25 541,461.05 392,269.29 542,207.50 392,280.21 542,222.60 391,762.10 541,506.46 391,202.50 540,732.96 391,117.82 540,615.91 391,576.96 541,250.55 392,146.45 542,037.72
48 Trailler 15 Ton Unit/Jam 338,378 515,000 339,293.05 516,393.41 339,760.80 517,105.31 339,770.26 517,119.70 339,321.51 516,436.72 338,836.81 515,699.03 338,763.46 515,587.39 339,161.15 516,192.66 339,654.40 516,943.38
49 Truck Mixer (agitator) Unit/Jam 425,535 625,000 426,686.72 626,691.03 427,274.94 627,554.98 427,286.84 627,572.45 426,722.50 626,743.59 426,112.96 625,848.34 426,020.72 625,712.86 426,520.84 626,447.40 427,141.14 627,358.47
50 Vibrating Rammer Unit/Jam 87,158 87,158 87,393.67 87,393.67 87,514.15 87,514.15 87,516.58 87,516.58 87,400.99 87,400.99 87,276.15 87,276.15 87,257.26 87,257.26 87,359.69 87,359.69 87,486.74 87,486.74
51 Vibratory Roller 5-8 T Unit/Jam 210,204 451,000 210,772.96 452,220.25 211,063.53 452,843.68 211,069.40 452,856.28 210,790.63 452,258.17 210,489.54 451,612.16 210,443.97 451,514.40 210,691.02 452,044.44 210,997.43 452,701.87
52 Water Pump 70-100 MM Unit/Jam 65,625 65,625 65,802.29 65,802.29 65,893.00 65,893.00 65,894.84 65,894.84 65,807.81 65,807.81 65,713.81 65,713.81 65,699.58 65,699.58 65,776.71 65,776.71 65,872.37 65,872.37
53 Water Tanker 3000-4500 L Unit/Jam 237,890 237,890 238,533.30 238,533.30 238,862.14 238,862.14 238,868.79 238,868.79 238,553.30 238,553.30 238,212.55 238,212.55 238,160.98 238,160.98 238,440.57 238,440.57 238,787.34 238,787.34
54 Welding Set Unit/Jam 133,300 133,300 133,660.90 133,660.90 133,845.16 133,845.16 133,848.89 133,848.89 133,672.11 133,672.11 133,481.17 133,481.17 133,452.27 133,452.27 133,608.94 133,608.94 133,803.25 133,803.25
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 231,737 369,000 232,364.33 369,998.39 232,684.67 370,508.46 232,691.15 370,518.78 232,383.82 370,029.41 232,051.88 369,500.86 232,001.65 369,420.87 232,274.00 369,854.54 232,611.80 370,392.44
HARGA SATUAN DASAR BAHAN KABUPATEN GRESIK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 323,000 323,000 323,873.93 323,873.93 324,320.41 324,320.41 324,329.44 324,329.44 323,901.09 323,901.09 323,438.42 323,438.42 323,368.40 323,368.40 323,748.02 323,748.02 324,218.86 324,218.86
2 Agregat Pecah Mesin 20-30 mm M3 308,000 308,000 308,833.34 308,833.34 309,259.10 309,259.10 309,267.70 309,267.70 308,859.24 308,859.24 308,418.06 308,418.06 308,351.30 308,351.30 308,713.28 308,713.28 309,162.25 309,162.25
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 353,000 353,000 353,955.10 353,955.10 354,443.05 354,443.05 354,452.92 354,452.92 353,984.78 353,984.78 353,479.14 353,479.14 353,402.62 353,402.62 353,817.49 353,817.49 354,332.06 354,332.06
4 Bahan Agr. Base Kelas A M3 338,000 338,000 338,914.51 338,914.51 339,381.73 339,381.73 339,391.18 339,391.18 338,942.93 338,942.93 338,458.78 338,458.78 338,385.51 338,385.51 338,782.75 338,782.75 339,275.46 339,275.46
5 Bahan Agr. Base Kelas B M3 318,000 318,000 318,860.40 318,860.40 319,299.98 319,299.98 319,308.86 319,308.86 318,887.14 318,887.14 318,431.63 318,431.63 318,362.70 318,362.70 318,736.44 318,736.44 319,199.99 319,199.99
6 Bahan Agr. Base Kelas C M3 292,000 292,000 292,790.05 292,790.05 293,193.69 293,193.69 293,201.85 293,201.85 292,814.60 292,814.60 292,396.34 292,396.34 292,333.05 292,333.05 292,676.23 292,676.23 293,101.88 293,101.88
7 Bahan Agr. Base Kelas C2 M3 267,000 267,000 267,722.41 267,722.41 268,091.49 268,091.49 268,098.95 268,098.95 267,744.86 267,744.86 267,362.41 267,362.41 267,304.53 267,304.53 267,618.33 267,618.33 268,007.54 268,007.54
8 Bahan Agr. Base Kelas S M3 216,000 216,000 216,584.42 216,584.42 216,883.00 216,883.00 216,889.04 216,889.04 216,602.58 216,602.58 216,293.19 216,293.19 216,246.36 216,246.36 216,500.22 216,500.22 216,815.09 216,815.09
9 Bahan Pilihan M3 215,000 215,000 215,581.72 215,581.72 215,878.91 215,878.91 215,884.92 215,884.92 215,599.79 215,599.79 215,291.83 215,291.83 215,245.22 215,245.22 215,497.91 215,497.91 215,811.31 215,811.31
10 Bahan Tanah Timbunan M3 123,000 123,000 123,332.80 123,332.80 123,502.82 123,502.82 123,506.26 123,506.26 123,343.14 123,343.14 123,166.95 123,166.95 123,140.29 123,140.29 123,284.85 123,284.85 123,464.15 123,464.15
11 Batu Belah/Kerakal M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
12 Batu Kali M3 359,000 359,000 359,971.33 359,971.33 360,467.58 360,467.58 360,477.62 360,477.62 360,001.52 360,001.52 359,487.29 359,487.29 359,409.47 359,409.47 359,831.39 359,831.39 360,354.70 360,354.70
13 Chipping M3 228,000 228,000 228,616.89 228,616.89 228,932.06 228,932.06 228,938.43 228,938.43 228,636.06 228,636.06 228,309.47 228,309.47 228,260.05 228,260.05 228,528.01 228,528.01 228,860.37 228,860.37
14 Chipping (kg) Kg 328 328 328.89 328.89 329.34 329.34 329.35 329.35 328.92 328.92 328.45 328.45 328.37 328.37 328.76 328.76 329.24 329.24
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 409,000 409,000 410,106.61 410,106.61 410,671.98 410,671.98 410,683.41 410,683.41 410,141.00 410,141.00 409,555.15 409,555.15 409,466.49 409,466.49 409,947.18 409,947.18 410,543.38 410,543.38
18 Kapur M3 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
19 Pasir Beton (Kasar) M3 487,000 487,000 488,317.65 488,317.65 488,990.84 488,990.84 489,004.45 489,004.45 488,358.60 488,358.60 487,661.02 487,661.02 487,555.46 487,555.46 488,127.81 488,127.81 488,837.72 488,837.72
20 Pasir Halus (untuk HRS) M3 375,000 375,000 376,014.62 376,014.62 376,532.99 376,532.99 376,543.47 376,543.47 376,046.15 376,046.15 375,509.00 375,509.00 375,427.71 375,427.71 375,868.44 375,868.44 376,415.08 376,415.08
21 Pasir Pasang (Sedang) M3 400,000 400,000 401,082.26 401,082.26 401,635.19 401,635.19 401,646.37 401,646.37 401,115.90 401,115.90 400,542.94 400,542.94 400,456.23 400,456.23 400,926.34 400,926.34 401,509.42 401,509.42
22 Pasir Urug M3 400,000 400,000 401,082.26 401,082.26 401,635.19 401,635.19 401,646.37 401,646.37 401,115.90 401,115.90 400,542.94 400,542.94 400,456.23 400,456.23 400,926.34 400,926.34 401,509.42 401,509.42
23 Pasir Urug (ada unsur lempung) M3 164,000 164,000 164,443.73 164,443.73 164,670.43 164,670.43 164,675.01 164,675.01 164,457.52 164,457.52 164,222.60 164,222.60 164,187.05 164,187.05 164,379.80 164,379.80 164,618.86 164,618.86
24 Sirtu M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 72,000 72,000 72,194.81 72,194.81 72,294.33 72,294.33 72,296.35 72,296.35 72,200.86 72,200.86 72,097.73 72,097.73 72,082.12 72,082.12 72,166.74 72,166.74 72,271.70 72,271.70
26 Anti Pengelupas Liter 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
27 Arbocell Kg 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
28 Asbuton Curah Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
33 Aspal Modifikasi (JAP-57) Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
40 Beton B-0 M3 604,978 604,978 606,614.85 606,614.85 607,451.12 607,451.12 607,468.03 607,468.03 606,665.72 606,665.72 605,799.15 605,799.15 605,668.01 605,668.01 606,379.02 606,379.02 607,260.90 607,260.90
41 Beton K-125 (fc' 10 MPa) M3 625,486 625,486 627,178.07 627,178.07 628,042.69 628,042.69 628,060.17 628,060.17 627,230.66 627,230.66 626,334.72 626,334.72 626,199.13 626,199.13 626,934.24 626,934.24 627,846.02 627,846.02
42 Beton K-175 (fc' 15 MPa) M3 676,755 676,755 678,586.11 678,586.11 679,521.60 679,521.60 679,540.51 679,540.51 678,643.01 678,643.01 677,673.63 677,673.63 677,526.93 677,526.93 678,322.30 678,322.30 679,308.81 679,308.81
43 Beton K-250 (fc' 20 MPa) M3 753,659 753,659 755,698.16 755,698.16 756,739.96 756,739.96 756,761.03 756,761.03 755,761.54 755,761.54 754,682.00 754,682.00 754,518.63 754,518.63 755,404.38 755,404.38 756,502.99 756,502.99
44 Beton K-300 (fc' 25 MPa) M3 784,421 784,421 786,542.99 786,542.99 787,627.31 787,627.31 787,649.23 787,649.23 786,608.94 786,608.94 785,485.34 785,485.34 785,315.30 785,315.30 786,237.21 786,237.21 787,380.66 787,380.66
45 Beton K-350 (fc' 30 MPa) M3 815,182 815,182 817,387.81 817,387.81 818,514.65 818,514.65 818,537.44 818,537.44 817,456.35 817,456.35 816,288.69 816,288.69 816,111.98 816,111.98 817,070.04 817,070.04 818,258.34 818,258.34
46 Beton K-400 (fc' 35 MPa) M3 845,944 845,944 848,232.63 848,232.63 849,402.00 849,402.00 849,425.64 849,425.64 848,303.76 848,303.76 847,092.04 847,092.04 846,908.66 846,908.66 847,902.87 847,902.87 849,136.01 849,136.01
47 Beton K-450 (fc' 40 MPa) M3 886,959 886,959 889,359.06 889,359.06 890,585.12 890,585.12 890,609.91 890,609.91 889,433.64 889,433.64 888,163.16 888,163.16 887,970.90 887,970.90 889,013.31 889,013.31 890,306.24 890,306.24
48 Beton K-500 (fc' 45 MPa) M3 922,848 922,848 925,344.69 925,344.69 926,620.36 926,620.36 926,646.15 926,646.15 925,422.29 925,422.29 924,100.40 924,100.40 923,900.36 923,900.36 924,984.95 924,984.95 926,330.19 926,330.19
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
51 Cat Anti Karat Kg 75,000 75,000 75,202.92 75,202.92 75,306.60 75,306.60 75,308.69 75,308.69 75,209.23 75,209.23 75,101.80 75,101.80 75,085.54 75,085.54 75,173.69 75,173.69 75,283.02 75,283.02
52 Cat Marka (Non Thermoplas) Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
53 Cat Marka (Thermoplastic) Kg 55,000 55,000 55,148.81 55,148.81 55,224.84 55,224.84 55,226.38 55,226.38 55,153.44 55,153.44 55,074.65 55,074.65 55,062.73 55,062.73 55,127.37 55,127.37 55,207.55 55,207.55
54 Cerucuk Diameter 10-15 cm M' 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
55 Cold Mix (Aspal Dingin) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,338,000 1,338,000 1,341,620.16 1,341,620.16 1,343,469.71 1,343,469.71 1,343,507.11 1,343,507.11 1,341,732.67 1,341,732.67 1,339,816.12 1,339,816.12 1,339,526.09 1,339,526.09 1,341,098.59 1,341,098.59 1,343,049.01 1,343,049.01
57 Curing Compound Liter 51,000 51,000 51,137.99 51,137.99 51,208.49 51,208.49 51,209.91 51,209.91 51,142.28 51,142.28 51,069.22 51,069.22 51,058.17 51,058.17 51,118.11 51,118.11 51,192.45 51,192.45
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 625,000 625,000 626,691.03 626,691.03 627,554.98 627,554.98 627,572.45 627,572.45 626,743.59 626,743.59 625,848.34 625,848.34 625,712.86 625,712.86 626,447.40 626,447.40 627,358.47 627,358.47
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 728,000 728,000 729,969.72 729,969.72 730,976.04 730,976.04 730,996.39 730,996.39 730,030.93 730,030.93 728,988.14 728,988.14 728,830.34 728,830.34 729,685.93 729,685.93 730,747.14 730,747.14
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 923,000 923,000 925,497.32 925,497.32 926,773.20 926,773.20 926,799.00 926,799.00 925,574.93 925,574.93 924,252.83 924,252.83 924,052.75 924,052.75 925,137.52 925,137.52 926,482.98 926,482.98
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
64 Oxygen (Isi 6 M3) Botol 176,000 176,000 176,476.19 176,476.19 176,719.48 176,719.48 176,724.40 176,724.40 176,490.99 176,490.99 176,238.89 176,238.89 176,200.74 176,200.74 176,407.59 176,407.59 176,664.14 176,664.14
65 Polytene 125 Mikron Kg 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80 27,062.53 27,062.53 27,101.89 27,101.89
66 Sand Sheet Ton 1,415,000 1,415,000 1,418,828.50 1,418,828.50 1,420,784.48 1,420,784.48 1,420,824.03 1,420,824.03 1,418,947.48 1,418,947.48 1,416,920.64 1,416,920.64 1,416,613.91 1,416,613.91 1,418,276.91 1,418,276.91 1,420,339.57 1,420,339.57
67 Seal Coat M2 113,000 113,000 113,305.74 113,305.74 113,461.94 113,461.94 113,465.10 113,465.10 113,315.24 113,315.24 113,153.38 113,153.38 113,128.88 113,128.88 113,261.69 113,261.69 113,426.41 113,426.41
68 Seal Guard Kg 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
69 Semen/PC (50 kg) Zak 74,000 74,000 74,200.22 74,200.22 74,302.51 74,302.51 74,304.58 74,304.58 74,206.44 74,206.44 74,100.44 74,100.44 74,084.40 74,084.40 74,171.37 74,171.37 74,279.24 74,279.24
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
72 Solar Liter 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
73 Thinner Liter 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
75 Baja Prategang Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 12,000 10,000 12,032.47 10,027.06 12,049.06 10,040.88 12,049.39 10,041.16 12,033.48 10,027.90 12,016.29 10,013.57 12,013.69 10,011.41 12,027.79 10,023.16 12,045.28 10,037.74
78 Baja Tulangan (Polos) U32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
81 Baja Tulangan (Ulir) D19 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
84 Baja Tulangan (Ulir) D36 Kg 11,000 12,000 11,029.76 12,032.47 11,044.97 12,049.06 11,045.28 12,049.39 11,030.69 12,033.48 11,014.93 12,016.29 11,012.55 12,013.69 11,025.47 12,027.79 11,041.51 12,045.28
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,330,000 13,330,000 13,366,066.36 13,366,066.36 13,384,492.66 13,384,492.66 13,384,865.25 13,384,865.25 13,367,187.22 13,367,187.22 13,348,093.35 13,348,093.35 13,345,203.83 13,345,203.83 13,360,870.14 13,360,870.14 13,380,301.38 13,380,301.38
87 Box Culvert Type DUB 200×200 M' 14,150,000 14,150,000 14,188,284.99 14,188,284.99 14,207,844.80 14,207,844.80 14,208,240.31 14,208,240.31 14,189,474.80 14,189,474.80 14,169,206.37 14,169,206.37 14,166,139.10 14,166,139.10 14,182,769.13 14,182,769.13 14,203,395.69 14,203,395.69
88 Box Culvert Type uk 300×200 M' 15,278,000 15,278,000 15,319,336.97 15,319,336.97 15,340,456.03 15,340,456.03 15,340,883.07 15,340,883.07 15,320,621.63 15,320,621.63 15,298,737.45 15,298,737.45 15,295,425.67 15,295,425.67 15,313,381.39 15,313,381.39 15,335,652.25 15,335,652.25
89 Casing M2 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
90 Ducting (Kabel Prestress) M' 199,000 199,000 199,538.43 199,538.43 199,813.51 199,813.51 199,819.07 199,819.07 199,555.16 199,555.16 199,270.11 199,270.11 199,226.97 199,226.97 199,460.85 199,460.85 199,750.94 199,750.94
91 Ducting (Strand Prestress) M' 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,231,000 2,231,000 2,237,036.31 2,237,036.31 2,240,120.26 2,240,120.26 2,240,182.62 2,240,182.62 2,237,223.91 2,237,223.91 2,234,028.23 2,234,028.23 2,233,544.62 2,233,544.62 2,236,166.64 2,236,166.64 2,239,418.78 2,239,418.78
94 Expansion Join Tipe Rubber M' 1,615,000 1,615,000 1,619,369.63 1,619,369.63 1,621,602.07 1,621,602.07 1,621,647.22 1,621,647.22 1,619,505.43 1,619,505.43 1,617,192.11 1,617,192.11 1,616,842.02 1,616,842.02 1,618,740.08 1,618,740.08 1,621,094.28 1,621,094.28
95 Expansion Join Tipe Torma M' 1,853,000 1,853,000 1,858,013.58 1,858,013.58 1,860,575.01 1,860,575.01 1,860,626.81 1,860,626.81 1,858,169.39 1,858,169.39 1,855,515.15 1,855,515.15 1,855,113.48 1,855,113.48 1,857,291.25 1,857,291.25 1,859,992.38 1,859,992.38
96 Expansion Tipe Joint Asphaltic Plug M' 2,198,000 2,198,000 2,203,947.03 2,203,947.03 2,206,985.36 2,206,985.36 2,207,046.80 2,207,046.80 2,204,131.85 2,204,131.85 2,200,983.43 2,200,983.43 2,200,506.98 2,200,506.98 2,203,090.22 2,203,090.22 2,206,294.26 2,206,294.26
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
99 Glass Bead Kg 72,000 72,000 72,194.81 72,194.81 72,294.33 72,294.33 72,296.35 72,296.35 72,200.86 72,200.86 72,097.73 72,097.73 72,082.12 72,082.12 72,166.74 72,166.74 72,271.70 72,271.70
100 Joint Sealent Kg 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
101 Joint Socket Pile 16×16×16 Set 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
102 Joint Socket Pile 35×35 Set 802,000 802,000 804,169.93 804,169.93 805,278.55 805,278.55 805,300.97 805,300.97 804,237.37 804,237.37 803,088.59 803,088.59 802,914.74 802,914.74 803,857.30 803,857.30 805,026.38 805,026.38
103 Kawat Beton Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
104 Kawat Bronjong Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
105 Kawat Las Dos 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
106 Kayu Acuan (Kelas III/Meranti) M3 4,500,000 4,500,000 4,512,175.44 4,512,175.44 4,518,395.87 4,518,395.87 4,518,521.65 4,518,521.65 4,512,553.82 4,512,553.82 4,506,108.03 4,506,108.03 4,505,132.58 4,505,132.58 4,510,421.28 4,510,421.28 4,516,980.96 4,516,980.96
107 Kayu Perancah (Gelam) M3 2,840,000 2,840,000 2,847,684.06 2,847,684.06 2,851,609.84 2,851,609.84 2,851,689.22 2,851,689.22 2,847,922.86 2,847,922.86 2,843,854.85 2,843,854.85 2,843,239.23 2,843,239.23 2,846,576.98 2,846,576.98 2,850,716.87 2,850,716.87
108 Kerb Pracetak Type 1 (Peninggi) Buah 56,000 56,000 56,151.52 56,151.52 56,228.93 56,228.93 56,230.49 56,230.49 56,156.23 56,156.23 56,076.01 56,076.01 56,063.87 56,063.87 56,129.69 56,129.69 56,211.32 56,211.32
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
110 Marmer Nama Jembatan Buah 615,000 615,000 616,663.98 616,663.98 617,514.10 617,514.10 617,531.29 617,531.29 616,715.69 616,715.69 615,834.76 615,834.76 615,701.45 615,701.45 616,424.24 616,424.24 617,320.73 617,320.73
111 Mata Kucing Buah 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
112 Matras Concrete (Tebal=10 cm) M2 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
113 Mini Pile 16×16×16 M' 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
114 Mini Timber Pile Buah 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
115 Multipleks 12 mm Lbr 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
116 Paku Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
117 Paving Block (Model Bata 8 cm) M2 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 68,166,000 68,166,000 68,350,433.56 68,350,433.56 68,444,660.68 68,444,660.68 68,446,566.01 68,446,566.01 68,356,165.33 68,356,165.33 68,258,524.49 68,258,524.49 68,243,748.26 68,243,748.26 68,323,861.51 68,323,861.51 68,423,227.62 68,423,227.62
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 96,568,000 96,568,000 96,829,279.53 96,829,279.53 96,962,767.26 96,962,767.26 96,965,466.46 96,965,466.46 96,837,399.49 96,837,399.49 96,699,075.68 96,699,075.68 96,678,142.80 96,678,142.80 96,791,635.98 96,791,635.98 96,932,403.90 96,932,403.90
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 184,570,000 184,570,000 185,069,382.43 185,069,382.43 185,324,516.95 185,324,516.95 185,329,675.92 185,329,675.92 185,084,902.08 185,084,902.08 184,820,524.38 184,820,524.38 184,780,515.45 184,780,515.45 184,997,434.48 184,997,434.48 185,266,483.60 185,266,483.60
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 242,034,000 242,034,000 242,688,860.09 242,688,860.09 243,023,428.15 243,023,428.15 243,030,193.32 243,030,193.32 242,709,211.62 242,709,211.62 242,362,522.60 242,362,522.60 242,310,057.31 242,310,057.31 242,594,511.88 242,594,511.88 242,947,326.72 242,947,326.72
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 308,529,000 308,529,000 309,363,772.50 309,363,772.50 309,790,257.84 309,790,257.84 309,798,881.63 309,798,881.63 309,389,715.30 309,389,715.30 308,947,778.97 308,947,778.97 308,880,899.67 308,880,899.67 309,243,503.62 309,243,503.62 309,693,248.74 309,693,248.74
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 372,240,000 372,240,000 373,247,152.38 373,247,152.38 373,761,706.60 373,761,706.60 373,772,111.20 373,772,111.20 373,278,452.34 373,278,452.34 372,745,256.51 372,745,256.51 372,664,566.68 372,664,566.68 373,102,048.07 373,102,048.07 373,644,665.21 373,644,665.21
124 Pelat Rambu (Eng. Grade) Buah 215,000 215,000 215,581.72 215,581.72 215,878.91 215,878.91 215,884.92 215,884.92 215,599.79 215,599.79 215,291.83 215,291.83 215,245.22 215,245.22 215,497.91 215,497.91 215,811.31 215,811.31
125 Pelat Rambu (High L Grade) Buah 251,000 251,000 251,679.12 251,679.12 252,026.08 252,026.08 252,033.10 252,033.10 251,700.22 251,700.22 251,340.69 251,340.69 251,286.28 251,286.28 251,581.28 251,581.28 251,947.16 251,947.16
126 Pemantul Cahaya (Reflector) Buah 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
127 Pipa Baja D10" Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
128 Pipa Drainase Baja Dia 3" M' 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
129 Pipa Galvanis Dia 1,5" M' 112,000 112,000 112,303.03 112,303.03 112,457.85 112,457.85 112,460.98 112,460.98 112,312.45 112,312.45 112,152.02 112,152.02 112,127.74 112,127.74 112,259.37 112,259.37 112,422.64 112,422.64
130 Pipa Galvanis Dia 2" M' 323,000 323,000 323,873.93 323,873.93 324,320.41 324,320.41 324,329.44 324,329.44 323,901.09 323,901.09 323,438.42 323,438.42 323,368.40 323,368.40 323,748.02 323,748.02 324,218.86 324,218.86
131 Pipa Galvanis Dia 3" M' 247,000 247,000 247,668.30 247,668.30 248,009.73 248,009.73 248,016.63 248,016.63 247,689.07 247,689.07 247,335.26 247,335.26 247,281.72 247,281.72 247,572.01 247,572.01 247,932.07 247,932.07
132 Pipa Porus M' 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
133 Pipa PVC Dia 4" M' 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
134 Plastik Filter M2 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
135 Rel Pengaman M' 174,000 174,000 174,470.78 174,470.78 174,711.31 174,711.31 174,716.17 174,716.17 174,485.41 174,485.41 174,236.18 174,236.18 174,198.46 174,198.46 174,402.96 174,402.96 174,656.60 174,656.60
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,106,000 2,106,000 2,111,698.11 2,111,698.11 2,114,609.27 2,114,609.27 2,114,668.13 2,114,668.13 2,111,875.19 2,111,875.19 2,108,858.56 2,108,858.56 2,108,402.05 2,108,402.05 2,110,877.16 2,110,877.16 2,113,947.09 2,113,947.09
137 Strip Bearing Buah 323,000 323,000 323,873.93 323,873.93 324,320.41 324,320.41 324,329.44 324,329.44 323,901.09 323,901.09 323,438.42 323,438.42 323,368.40 323,368.40 323,748.02 323,748.02 324,218.86 324,218.86
138 Tiang Pancang Baja Diameter 400 M' 746,000 746,000 748,018.42 748,018.42 749,049.63 749,049.63 749,070.48 749,070.48 748,081.15 748,081.15 747,012.58 747,012.58 746,850.87 746,850.87 747,727.62 747,727.62 748,815.07 748,815.07
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 912,000 912,000 914,467.56 914,467.56 915,728.23 915,728.23 915,753.72 915,753.72 914,544.24 914,544.24 913,237.89 913,237.89 913,040.20 913,040.20 914,112.05 914,112.05 915,441.48 915,441.48
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,907,000 1,907,000 1,912,159.68 1,912,159.68 1,914,795.76 1,914,795.76 1,914,849.07 1,914,849.07 1,912,320.03 1,912,320.03 1,909,588.45 1,909,588.45 1,909,175.07 1,909,175.07 1,911,416.31 1,911,416.31 1,914,196.15 1,914,196.15
HARGA SATUAN DASAR UPAH KABUPATEN GRESIK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 123,318.35
2 Tukang OH 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 138,357.17
3 Mandor OH 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 159,411.52
4 Operator OH 329,366.17 329,366.17 329,033.29 329,033.29 328,554.66 328,554.66 328,374.07 328,374.07 328,652.21 328,652.21 329,123.99 329,123.99 329,351.01 329,351.01 328,848.92 328,848.92
5 Pembantu Operator OH 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38 205,530.58 205,530.58
6 Sopir OH 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 154,398.58
7 Pembantu Sopir OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23
8 Mekanik OH 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 185,478.81
9 Pembantu Mekanik OH 133,553.97 133,553.97 133,418.99 133,418.99 133,224.91 133,224.91 133,151.68 133,151.68 133,264.46 133,264.46 133,455.76 133,455.76 133,547.82 133,547.82 133,344.23 133,344.23
10 Kepala Tukang OH 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 154,398.58
11 Pemasak Aspal OH 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 154,398.58

HARGA SATUAN DASAR ALAT KABUPATEN GRESIK TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 484,968.60 541,245.02 484,478.46 540,698.00 483,773.70 539,911.46 483,507.80 539,614.71 483,917.34 540,071.77 484,612.01 540,847.05 484,946.27 541,220.10 484,206.98 984,243.32
2 Asphalt Distribution Unit/Jam 298,600.62 383,591.09 298,298.84 383,203.41 297,864.91 382,645.97 297,701.19 382,435.65 297,953.35 382,759.58 298,381.06 383,309.04 298,586.88 383,573.43 298,131.69 656,271.07
3 Asphalt Finisher Unit/Jam 219,317.01 1,040,315.10 219,095.35 1,039,263.69 218,776.64 1,037,751.90 218,656.39 1,037,181.51 218,841.60 1,038,060.02 219,155.75 1,039,550.17 219,306.91 1,040,267.21 218,972.59 1,239,402.55
4 Asphalt Liquid Mixer Unit/Jam 78,253.96 143,595.62 78,174.87 143,450.49 78,061.15 143,241.82 78,018.24 143,163.09 78,084.33 143,284.35 78,196.42 143,490.03 78,250.35 143,589.01 78,131.06 214,988.94
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 105,025.05 105,025.05 104,918.90 104,918.90 104,766.28 104,766.28 104,708.70 104,708.70 104,797.38 104,797.38 104,947.82 104,947.82 105,020.21 105,020.21 104,860.11 200,980.12
6 Asphalt Mixing Plant Unit/Jam 1,173,809.34 6,021,023.09 1,172,623.02 6,014,937.89 1,170,917.23 6,006,188.11 1,170,273.65 6,002,886.87 1,171,264.89 6,007,971.39 1,172,946.25 6,016,595.92 1,173,755.31 6,020,745.93 1,171,965.95 7,085,849.96
7 Asphalt Sprayer Unit/Jam 96,787.79 96,787.79 96,689.97 96,689.97 96,549.32 96,549.32 96,496.25 96,496.25 96,577.98 96,577.98 96,716.62 96,716.62 96,783.33 96,783.33 96,635.79 185,216.98
8 Asphalt Tanker Unit/Jam 453,049.22 525,178.37 452,591.34 524,647.60 451,932.97 523,884.41 451,684.57 523,596.46 452,067.15 524,039.95 452,716.10 524,792.22 453,028.36 525,154.20 452,337.74 938,988.96
9 Blending Equipment Unit/Jam 147,241.00 232,966.31 147,092.19 232,730.87 146,878.21 232,392.32 146,797.48 232,264.59 146,921.82 232,461.32 147,132.73 232,795.02 147,234.22 232,955.59 147,009.76 367,356.94
10 Bore Pile Machine Unit/Jam 405,684.98 704,923.94 405,274.97 704,211.50 404,685.43 703,187.10 404,463.00 702,800.60 404,805.58 703,395.88 405,386.69 704,405.62 405,666.31 704,891.49 405,047.88 1,075,104.00
11 Bore Pile Machine Dia 60 Unit/Jam 265,651.59 803,332.12 265,383.10 802,520.23 264,997.06 801,352.82 264,851.41 800,912.36 265,075.74 801,590.75 265,456.26 802,741.44 265,639.36 803,295.14 265,234.40 1,045,197.63
12 Bore Pile Machine Dia 80 Unit/Jam 1,050,250.46 1,050,250.46 1,049,189.02 1,049,189.02 1,047,662.79 1,047,662.79 1,047,086.95 1,047,086.95 1,047,973.85 1,047,973.85 1,049,478.23 1,049,478.23 1,050,202.12 1,050,202.12 1,048,601.11 2,009,801.23
13 Bulldozer 100-150 HP Unit/Jam 411,862.93 597,478.26 411,446.67 596,874.42 410,848.15 596,006.16 410,622.33 595,678.57 410,970.14 596,183.12 411,560.09 597,038.95 411,843.97 597,450.76 411,216.12 973,481.19
14 Cement Tanker Unit/Jam 383,032.52 494,049.25 382,645.41 493,549.94 382,088.78 492,831.98 381,878.77 492,561.10 382,202.23 492,978.31 382,750.88 493,685.99 383,014.89 494,026.51 382,430.99 843,828.72
15 Cold Milling Unit/Jam 598,230.90 1,273,281.41 597,626.29 1,271,994.56 596,756.94 1,270,144.22 596,428.94 1,269,446.10 596,934.12 1,270,521.34 597,791.03 1,272,345.19 598,203.36 1,273,222.80 597,291.42 1,818,788.93
16 Cold Recycler Unit/Jam 5,038,113.24 5,038,113.24 5,033,021.44 5,033,021.44 5,025,700.02 5,025,700.02 5,022,937.70 5,022,937.70 5,027,192.19 5,027,192.19 5,034,408.79 5,034,408.79 5,037,881.33 5,037,881.33 5,030,201.22 9,641,134.74
17 Compressor 4000-6500 L\M Unit/Jam 153,418.94 153,418.94 153,263.89 153,263.89 153,040.94 153,040.94 152,956.82 152,956.82 153,086.38 153,086.38 153,306.13 153,306.13 153,411.88 153,411.88 153,178.01 293,588.61
18 Concrete Breaker Unit/Jam 559,103.92 1,065,419.23 558,538.86 1,064,342.45 557,726.37 1,062,794.18 557,419.82 1,062,210.02 557,891.96 1,063,109.73 558,692.82 1,064,635.84 559,078.19 1,065,370.18 558,225.89 1,575,443.77
19 Concrete Mixer (350) Unit/Jam 103,995.39 103,995.39 103,890.29 103,890.29 103,739.16 103,739.16 103,682.14 103,682.14 103,769.96 103,769.96 103,918.92 103,918.92 103,990.60 103,990.60 103,832.07 199,009.73
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 118,410.59 118,410.59 118,290.92 118,290.92 118,118.84 118,118.84 118,053.92 118,053.92 118,153.91 118,153.91 118,323.53 118,323.53 118,405.14 118,405.14 118,224.64 226,595.24
21 Concrete Pan Mixer Unit/Jam 315,075.14 674,798.98 314,756.71 674,116.99 314,298.84 673,136.37 314,126.09 672,766.39 314,392.15 673,336.23 314,843.47 674,302.81 315,060.63 674,767.92 314,580.33 962,099.29
22 Concrete Pump Unit/Jam 239,910.15 257,066.28 239,667.69 256,806.47 239,319.05 256,432.90 239,187.51 256,291.96 239,390.10 256,509.04 239,733.75 256,877.26 239,899.11 257,054.45 239,533.39 476,230.84
23 Concrete Vibrator Unit/Jam 89,580.19 89,580.19 89,489.65 89,489.65 89,359.47 89,359.47 89,310.36 89,310.36 89,386.00 89,386.00 89,514.32 89,514.32 89,576.06 89,576.06 89,439.51 171,424.22
24 Crane 10-15 Ton Unit/Jam 321,253.08 321,253.08 320,928.41 320,928.41 320,461.56 320,461.56 320,285.42 320,285.42 320,556.71 320,556.71 321,016.87 321,016.87 321,238.29 321,238.29 320,748.58 614,762.73
25 Crane On Track 35 Ton Unit/Jam 266,681.24 506,099.24 266,411.72 505,587.74 266,024.18 504,852.28 265,877.96 504,574.79 266,103.16 505,002.17 266,485.16 505,727.11 266,668.97 506,075.94 266,262.44 749,373.88
26 Crane On Track 75-100 Ton Unit/Jam 419,070.53 635,636.54 418,646.99 634,994.13 418,037.99 634,070.42 417,808.22 633,721.91 418,162.11 634,258.68 418,762.39 635,169.17 419,051.24 635,607.28 418,412.41 1,018,176.01
27 Dump Truck 10 Ton Unit/Jam 396,418.07 426,770.19 396,017.42 426,338.87 395,441.35 425,718.69 395,224.00 425,484.69 395,558.76 425,845.08 396,126.59 426,456.39 396,399.82 426,750.54 395,795.52 788,905.90
28 Dump Truck 3-4 M3 Unit/Jam 216,228.04 283,174.57 216,009.50 282,888.38 215,695.28 282,476.87 215,576.73 282,321.61 215,759.32 282,560.74 216,069.05 282,966.36 216,218.08 283,161.54 215,888.46 480,624.01
29 Excavator 80-140 HP Unit/Jam 313,015.82 497,061.75 312,699.47 496,559.39 312,244.60 495,837.06 312,072.97 495,564.53 312,337.30 495,984.28 312,785.67 496,696.27 313,001.42 497,038.87 312,524.25 782,756.48
30 Flat Bed Truck 3-4 M3 Unit/Jam 379,943.55 508,107.57 379,559.56 507,594.04 379,007.42 506,855.66 378,799.10 506,577.07 379,119.95 507,006.15 379,664.18 507,733.96 379,926.06 508,084.18 379,346.87 855,037.90
31 Fulvi Mixer Unit/Jam 951,403.36 1,486,164.42 950,441.82 1,484,662.42 949,059.23 1,482,502.72 948,537.59 1,481,687.88 949,341.01 1,482,942.88 950,703.81 1,485,071.67 951,359.56 1,486,096.01 949,909.24 2,354,564.73
32 Generator Set Unit/Jam 423,189.16 448,861.82 422,761.46 448,408.18 422,146.48 447,755.89 421,914.45 447,509.78 422,271.81 447,888.83 422,877.99 448,531.78 423,169.68 448,841.16 422,524.57 835,464.02
33 Hot Recycler Unit/Jam 3,108,535.44 9,115,811.24 3,105,393.77 9,106,598.27 3,100,876.43 9,093,351.12 3,099,172.07 9,088,353.06 3,101,797.10 9,096,051.01 3,106,249.77 9,109,108.51 3,108,392.34 9,115,391.62 3,103,653.69 11,946,459.35
34 Jack Hammer Unit/Jam 58,690.47 58,690.47 58,631.15 58,631.15 58,545.86 58,545.86 58,513.68 58,513.68 58,563.24 58,563.24 58,647.31 58,647.31 58,687.77 58,687.77 58,598.30 112,312.42
35 Launching Gantry Unit/Jam 74,690,312.01 74,690,312.01 74,614,825.65 74,614,825.65 74,506,285.26 74,506,285.26 74,465,333.70 74,465,333.70 74,528,406.76 74,528,406.76 74,635,393.31 74,635,393.31 74,686,873.84 74,686,873.84 74,573,015.86 142,930,364.38
36 Motor Grader > 100 HP Unit/Jam 293,452.33 493,045.09 293,155.75 492,546.79 292,729.31 491,830.29 292,568.41 491,559.96 292,816.22 491,976.32 293,236.56 492,682.56 293,438.83 493,022.39 292,991.49 760,841.42
37 Pedestrian Roller Unit/Jam 96,787.79 96,787.79 96,689.97 96,689.97 96,549.32 96,549.32 96,496.25 96,496.25 96,577.98 96,577.98 96,716.62 96,716.62 96,783.33 96,783.33 96,635.79 185,216.98
38 Pile Driver + Hammer Unit/Jam 110,173.33 322,337.01 110,061.99 322,011.24 109,901.88 321,542.82 109,841.47 321,366.09 109,934.51 321,638.29 110,092.32 322,100.00 110,168.26 322,322.18 110,000.31 422,662.58
39 Rock Drill Breaker Unit/Jam 107,084.36 348,445.31 106,976.14 348,093.15 106,820.52 347,586.79 106,761.81 347,395.74 106,852.24 347,689.99 107,005.62 348,189.10 107,079.43 348,429.27 106,916.19 445,902.82
40 Split Form Paver Unit/Jam 226,524.61 226,524.61 226,295.67 226,295.67 225,966.48 225,966.48 225,842.28 225,842.28 226,033.57 226,033.57 226,358.05 226,358.05 226,514.18 226,514.18 226,168.87 433,486.54
41 Stone Crusher Unit/Jam 606,468.16 756,136.36 605,855.23 755,372.16 604,973.90 754,273.34 604,641.39 753,858.76 605,153.53 754,497.29 606,022.23 755,580.38 606,440.24 756,101.55 605,515.74 1,309,994.85
42 Tamper Unit/Jam 90,609.84 90,609.84 90,518.27 90,518.27 90,386.59 90,386.59 90,336.91 90,336.91 90,413.43 90,413.43 90,543.22 90,543.22 90,605.67 90,605.67 90,467.55 173,394.62
43 Tandem Roller 6-8 T Unit/Jam 437,604.36 511,120.06 437,162.09 510,603.49 436,526.16 509,860.73 436,286.23 509,580.49 436,655.77 510,012.11 437,282.59 510,744.24 437,584.22 511,096.53 436,917.13 910,817.43
44 Three Wheel Roller 6-8 T Unit/Jam 145,181.68 183,762.22 145,034.95 183,576.50 144,823.97 183,309.46 144,744.37 183,208.70 144,866.97 183,363.88 145,074.93 183,627.10 145,175.00 183,753.76 144,953.68 316,345.42
45 Tire Roller 8-10 T Unit/Jam 259,473.64 468,945.13 259,211.40 468,471.18 258,834.34 467,789.71 258,692.07 467,532.59 258,911.19 467,928.60 259,282.86 468,600.32 259,461.70 468,923.54 259,066.16 705,681.65
46 Track Loader 75-100 HP Unit/Jam 242,999.13 320,328.68 242,753.54 320,004.94 242,400.41 319,539.44 242,267.18 319,363.81 242,472.38 319,634.31 242,820.45 320,093.15 242,987.94 320,313.94 242,617.51 542,220.95
47 Trailer 20 Ton Unit/Jam 392,299.44 542,249.18 391,902.96 541,701.15 391,332.86 540,913.15 391,117.77 540,615.85 391,449.05 541,073.75 392,010.99 541,850.47 392,281.38 542,224.22 391,683.36 900,434.13
48 Trailler 15 Ton Unit/Jam 339,786.91 517,145.05 339,443.51 516,622.40 338,949.73 515,870.88 338,763.43 515,587.33 339,050.36 516,024.04 339,537.07 516,764.80 339,771.27 517,121.25 339,253.30 827,309.42
49 Truck Mixer (agitator) Unit/Jam 427,307.79 627,603.22 426,875.92 626,968.93 426,254.96 626,056.89 426,020.67 625,712.79 426,381.52 626,242.77 426,993.59 627,141.75 427,288.12 627,574.33 426,636.73 1,017,694.13
50 Vibrating Rammer Unit/Jam 87,520.87 87,520.87 87,432.42 87,432.42 87,305.23 87,305.23 87,257.25 87,257.25 87,331.15 87,331.15 87,456.52 87,456.52 87,516.84 87,516.84 87,383.43 167,483.44
51 Vibratory Roller 5-8 T Unit/Jam 211,079.75 452,878.48 210,866.42 452,420.78 210,559.68 451,762.65 210,443.95 451,514.35 210,622.19 451,896.78 210,924.55 452,545.49 211,070.03 452,857.64 210,748.26 645,349.64
52 Water Pump 70-100 MM Unit/Jam 65,898.07 65,898.07 65,831.47 65,831.47 65,735.70 65,735.70 65,699.57 65,699.57 65,755.22 65,755.22 65,849.61 65,849.61 65,895.03 65,895.03 65,794.58 126,105.18
53 Water Tanker 3000-4500 L Unit/Jam 238,880.50 238,880.50 238,639.07 238,639.07 238,291.93 238,291.93 238,160.95 238,160.95 238,362.68 238,362.68 238,704.85 238,704.85 238,869.50 238,869.50 238,505.35 457,131.26
54 Welding Set Unit/Jam 133,855.45 133,855.45 133,720.17 133,720.17 133,525.65 133,525.65 133,452.26 133,452.26 133,565.29 133,565.29 133,757.03 133,757.03 133,849.29 133,849.29 133,645.24 256,151.14
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 232,702.55 370,536.94 232,467.37 370,162.45 232,129.21 369,623.99 232,001.62 369,420.83 232,198.13 369,733.73 232,531.45 370,264.49 232,691.84 370,519.88 232,337.11 582,926.83
HARGA SATUAN DASAR BAHAN KABUPATEN GRESIK TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 324,345.34 324,345.34 324,017.54 324,017.54 323,546.20 323,546.20 323,368.37 323,368.37 323,642.26 323,642.26 324,106.86 324,106.86 324,330.41 324,330.41 323,835.98 620,680.20
2 Agregat Pecah Mesin 20-30 mm M3 309,282.87 309,282.87 308,970.29 308,970.29 308,520.84 308,520.84 308,351.26 308,351.26 308,612.44 308,612.44 309,055.46 309,055.46 309,268.63 309,268.63 308,797.16 591,856.05
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 354,470.30 354,470.30 354,112.05 354,112.05 353,596.93 353,596.93 353,402.58 353,402.58 353,701.92 353,701.92 354,209.66 354,209.66 354,453.98 354,453.98 353,913.63 678,328.52
4 Bahan Agr. Base Kelas A M3 339,407.82 339,407.82 339,064.80 339,064.80 338,571.57 338,571.57 338,385.47 338,385.47 338,672.09 338,672.09 339,158.26 339,158.26 339,392.20 339,392.20 338,874.80 649,504.36
5 Bahan Agr. Base Kelas B M3 319,324.52 319,324.52 319,001.79 319,001.79 318,537.75 318,537.75 318,362.67 318,362.67 318,632.32 318,632.32 319,089.72 319,089.72 319,309.82 319,309.82 318,823.04 611,072.15
6 Bahan Agr. Base Kelas C M3 293,216.22 293,216.22 292,919.88 292,919.88 292,493.78 292,493.78 292,333.01 292,333.01 292,580.62 292,580.62 293,000.63 293,000.63 293,202.73 293,202.73 292,755.75 561,110.28
7 Bahan Agr. Base Kelas C2 M3 268,112.10 268,112.10 267,841.13 267,841.13 267,451.50 267,451.50 267,304.50 267,304.50 267,530.91 267,530.91 267,914.96 267,914.96 268,099.75 268,099.75 267,691.04 513,070.01
8 Bahan Agr. Base Kelas S M3 216,899.67 216,899.67 216,680.46 216,680.46 216,365.26 216,365.26 216,246.34 216,246.34 216,429.50 216,429.50 216,740.19 216,740.19 216,889.69 216,889.69 216,559.05 415,067.88
9 Bahan Pilihan M3 215,895.51 215,895.51 215,677.31 215,677.31 215,363.57 215,363.57 215,245.20 215,245.20 215,427.51 215,427.51 215,736.76 215,736.76 215,885.57 215,885.57 215,556.46 413,146.27
10 Bahan Tanah Timbunan M3 123,512.31 123,512.31 123,387.48 123,387.48 123,208.00 123,208.00 123,140.28 123,140.28 123,244.58 123,244.58 123,421.50 123,421.50 123,506.63 123,506.63 123,318.35 236,358.10
11 Batu Belah/Kerakal M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
12 Batu Kali M3 360,495.29 360,495.29 360,130.95 360,130.95 359,607.08 359,607.08 359,409.42 359,409.42 359,713.85 359,713.85 360,230.22 360,230.22 360,478.69 360,478.69 359,929.16 689,858.18
13 Chipping M3 228,949.65 228,949.65 228,718.26 228,718.26 228,385.55 228,385.55 228,260.02 228,260.02 228,453.36 228,453.36 228,781.31 228,781.31 228,939.12 228,939.12 228,590.10 438,127.20
14 Chipping (kg) Kg 329.37 329.37 329.03 329.03 328.55 328.55 328.37 328.37 328.65 328.65 329.12 329.12 329.35 329.35 328.85 630.29
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 410,703.55 410,703.55 410,288.47 410,288.47 409,691.63 409,691.63 409,466.45 409,466.45 409,813.27 409,813.27 410,401.56 410,401.56 410,684.64 410,684.64 410,058.56 785,938.71
18 Kapur M3 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
19 Pasir Beton (Kasar) M3 489,028.43 489,028.43 488,534.19 488,534.19 487,823.53 487,823.53 487,555.40 487,555.40 487,968.37 487,968.37 488,668.85 488,668.85 489,005.92 489,005.92 488,260.44 935,824.33
20 Pasir Halus (untuk HRS) M3 376,561.93 376,561.93 376,181.36 376,181.36 375,634.13 375,634.13 375,427.67 375,427.67 375,745.66 375,745.66 376,285.05 376,285.05 376,544.60 376,544.60 375,970.57 720,603.95
21 Pasir Pasang (Sedang) M3 401,666.06 401,666.06 401,260.11 401,260.11 400,676.41 400,676.41 400,456.18 400,456.18 400,795.37 400,795.37 401,370.72 401,370.72 401,647.57 401,647.57 401,035.27 768,644.22
22 Pasir Urug M3 401,666.06 401,666.06 401,260.11 401,260.11 400,676.41 400,676.41 400,456.18 400,456.18 400,795.37 400,795.37 401,370.72 401,370.72 401,647.57 401,647.57 401,035.27 768,644.22
23 Pasir Urug (ada unsur lempung) M3 164,683.08 164,683.08 164,516.65 164,516.65 164,277.33 164,277.33 164,187.03 164,187.03 164,326.10 164,326.10 164,562.00 164,562.00 164,675.50 164,675.50 164,424.46 315,144.13
24 Sirtu M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 72,299.89 72,299.89 72,226.82 72,226.82 72,121.75 72,121.75 72,082.11 72,082.11 72,143.17 72,143.17 72,246.73 72,246.73 72,296.56 72,296.56 72,186.35 138,355.96
26 Anti Pengelupas Liter 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
27 Arbocell Kg 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 280,555.14
28 Asbuton Curah Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
29 Aspal Emulsi (CRS-1/53 R-65) Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
37 Assetilline Botol 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
39 Bensin Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
40 Beton B-0 M3 607,497.82 607,497.82 606,883.84 606,883.84 606,001.02 606,001.02 605,667.94 605,667.94 606,180.95 606,180.95 607,051.13 607,051.13 607,469.85 607,469.85 606,543.78 1,162,532.09
41 Beton K-125 (fc' 10 MPa) M3 628,090.96 628,090.96 627,456.18 627,456.18 626,543.43 626,543.43 626,199.06 626,199.06 626,729.46 626,729.46 627,629.14 627,629.14 628,062.05 628,062.05 627,104.59 1,201,939.95
42 Beton K-175 (fc' 15 MPa) M3 679,573.83 679,573.83 678,887.01 678,887.01 677,899.45 677,899.45 677,526.85 677,526.85 678,100.72 678,100.72 679,074.15 679,074.15 679,542.55 679,542.55 678,506.60 1,300,459.62
43 Beton K-250 (fc' 20 MPa) M3 756,798.13 756,798.13 756,033.26 756,033.26 754,933.48 754,933.48 754,518.54 754,518.54 755,157.63 755,157.63 756,241.66 756,241.66 756,763.29 756,763.29 755,609.63 1,448,239.12
44 Beton K-300 (fc' 25 MPa) M3 787,687.85 787,687.85 786,891.76 786,891.76 785,747.09 785,747.09 785,315.21 785,315.21 785,980.39 785,980.39 787,108.67 787,108.67 787,651.59 787,651.59 786,450.84 1,507,350.93
45 Beton K-350 (fc' 30 MPa) M3 818,577.57 818,577.57 817,750.26 817,750.26 816,560.70 816,560.70 816,111.89 816,111.89 816,803.15 816,803.15 817,975.68 817,975.68 818,539.88 818,539.88 817,292.04 1,566,462.73
46 Beton K-400 (fc' 35 MPa) M3 849,467.29 849,467.29 848,608.76 848,608.76 847,374.31 847,374.31 846,908.56 846,908.56 847,625.91 847,625.91 848,842.68 848,842.68 849,428.18 849,428.18 848,133.25 1,625,574.53
47 Beton K-450 (fc' 40 MPa) M3 890,653.58 890,653.58 889,753.43 889,753.43 888,459.13 888,459.13 887,970.80 887,970.80 888,722.92 888,722.92 889,998.69 889,998.69 890,612.58 890,612.58 889,254.87 1,704,390.26
48 Beton K-500 (fc' 45 MPa) M3 926,691.58 926,691.58 925,755.02 925,755.02 924,408.34 924,408.34 923,900.25 923,900.25 924,682.81 924,682.81 926,010.20 926,010.20 926,648.93 926,648.93 925,236.28 1,773,354.03
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
51 Cat Anti Karat Kg 75,312.39 75,312.39 75,236.27 75,236.27 75,126.83 75,126.83 75,085.53 75,085.53 75,149.13 75,149.13 75,257.01 75,257.01 75,308.92 75,308.92 75,194.11 144,120.79
52 Cat Marka (Non Thermoplas) Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
53 Cat Marka (Thermoplastic) Kg 55,229.08 55,229.08 55,173.27 55,173.27 55,093.01 55,093.01 55,062.73 55,062.73 55,109.36 55,109.36 55,188.47 55,188.47 55,226.54 55,226.54 55,142.35 105,688.58
54 Cerucuk Diameter 10-15 cm M' 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,343,572.97 1,343,572.97 1,342,215.08 1,342,215.08 1,340,262.59 1,340,262.59 1,339,525.93 1,339,525.93 1,340,660.53 1,340,660.53 1,342,585.06 1,342,585.06 1,343,511.12 1,343,511.12 1,341,462.98 2,571,114.90
57 Curing Compound Liter 51,212.42 51,212.42 51,160.66 51,160.66 51,086.24 51,086.24 51,058.16 51,058.16 51,101.41 51,101.41 51,174.77 51,174.77 51,210.07 51,210.07 51,132.00 98,002.14
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 627,603.22 627,603.22 626,968.93 626,968.93 626,056.89 626,056.89 625,712.79 625,712.79 626,242.77 626,242.77 627,141.75 627,141.75 627,574.33 627,574.33 626,617.61 1,201,006.59
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 731,032.23 731,032.23 730,293.41 730,293.41 729,231.07 729,231.07 728,830.25 728,830.25 729,447.58 729,447.58 730,494.71 730,494.71 730,998.58 730,998.58 729,884.19 1,398,932.47
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 926,844.43 926,844.43 925,907.71 925,907.71 924,560.82 924,560.82 924,052.64 924,052.64 924,835.33 924,835.33 926,162.94 926,162.94 926,801.77 926,801.77 925,388.89 1,773,646.53
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
64 Oxygen (Isi 6 M3) Botol 176,733.07 176,733.07 176,554.45 176,554.45 176,297.62 176,297.62 176,200.72 176,200.72 176,349.96 176,349.96 176,603.12 176,603.12 176,724.93 176,724.93 176,455.52 338,203.46
65 Polytene 125 Mikron Kg 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21 27,069.88 51,883.48
66 Sand Sheet Ton 1,420,893.69 1,420,893.69 1,419,457.65 1,419,457.65 1,417,392.80 1,417,392.80 1,416,613.75 1,416,613.75 1,417,813.63 1,417,813.63 1,419,848.93 1,419,848.93 1,420,828.28 1,420,828.28 1,418,662.27 2,719,078.92
67 Seal Coat M2 113,470.66 113,470.66 113,355.98 113,355.98 113,191.09 113,191.09 113,128.87 113,128.87 113,224.69 113,224.69 113,387.23 113,387.23 113,465.44 113,465.44 113,292.46 217,141.99
68 Seal Guard Kg 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
69 Semen/PC (50 kg) Zak 74,308.22 74,308.22 74,233.12 74,233.12 74,125.14 74,125.14 74,084.39 74,084.39 74,147.14 74,147.14 74,253.58 74,253.58 74,304.80 74,304.80 74,191.53 142,199.18
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
72 Solar Liter 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
73 Thinner Liter 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
75 Baja Prategang Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 12,049.98 10,041.65 12,037.80 10,031.50 12,020.29 10,016.91 12,013.69 10,011.40 12,023.86 10,019.88 12,041.12 10,034.27 12,049.43 10,041.19 12,031.06 21,054.15
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
81 Baja Tulangan (Ulir) D19 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 12,049.98 11,034.65 12,037.80 11,018.60 12,020.29 11,012.55 12,013.69 11,021.87 12,023.86 11,037.69 12,041.12 11,045.31 12,049.43 11,028.47 22,140.30
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,385,521.46 13,385,521.46 13,371,993.28 13,371,993.28 13,352,541.36 13,352,541.36 13,345,202.28 13,345,202.28 13,356,505.83 13,356,505.83 13,375,679.28 13,375,679.28 13,384,905.29 13,384,905.29 13,364,500.39 25,615,068.52
87 Box Culvert Type DUB 200×200 M' 14,208,936.88 14,208,936.88 14,194,576.51 14,194,576.51 14,173,928.00 14,173,928.00 14,166,137.46 14,166,137.46 14,178,136.35 14,178,136.35 14,198,489.26 14,198,489.26 14,208,282.81 14,208,282.81 14,186,622.70 27,190,789.16
88 Box Culvert Type uk 300×200 M' 15,341,635.17 15,341,635.17 15,326,130.03 15,326,130.03 15,303,835.48 15,303,835.48 15,295,423.89 15,295,423.89 15,308,379.30 15,308,379.30 15,330,354.69 15,330,354.69 15,340,928.96 15,340,928.96 15,317,542.16 29,358,365.85
89 Casing M2 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
90 Ducting (Kabel Prestress) M' 199,828.87 199,828.87 199,626.91 199,626.91 199,336.51 199,336.51 199,226.95 199,226.95 199,395.70 199,395.70 199,681.93 199,681.93 199,819.67 199,819.67 199,515.05 382,400.50
91 Ducting (Strand Prestress) M' 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 332,438.62
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,240,292.45 2,240,292.45 2,238,028.28 2,238,028.28 2,234,772.68 2,234,772.68 2,233,544.36 2,233,544.36 2,235,436.20 2,235,436.20 2,238,645.20 2,238,645.20 2,240,189.33 2,240,189.33 2,236,774.22 4,287,113.12
94 Expansion Join Tipe Rubber M' 1,621,726.72 1,621,726.72 1,620,087.71 1,620,087.71 1,617,731.00 1,617,731.00 1,616,841.84 1,616,841.84 1,618,211.32 1,618,211.32 1,620,534.29 1,620,534.29 1,621,652.07 1,621,652.07 1,619,179.90 3,103,401.02
95 Expansion Join Tipe Torma M' 1,860,718.02 1,860,718.02 1,858,837.47 1,858,837.47 1,856,133.47 1,856,133.47 1,855,113.27 1,855,113.27 1,856,684.57 1,856,684.57 1,859,349.87 1,859,349.87 1,860,632.37 1,860,632.37 1,857,795.89 3,560,744.33
96 Expansion Tipe Joint Asphaltic Plug M' 2,207,155.00 2,207,155.00 2,204,924.32 2,204,924.32 2,201,716.87 2,201,716.87 2,200,506.72 2,200,506.72 2,202,370.58 2,202,370.58 2,205,532.11 2,205,532.11 2,207,053.40 2,207,053.40 2,203,688.81 4,223,699.97
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
99 Glass Bead Kg 72,299.89 72,299.89 72,226.82 72,226.82 72,121.75 72,121.75 72,082.11 72,082.11 72,143.17 72,143.17 72,246.73 72,246.73 72,296.56 72,296.56 72,186.35 138,355.96
100 Joint Sealent Kg 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
101 Joint Socket Pile 16×16×16 Set 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
102 Joint Socket Pile 35×35 Set 805,340.45 805,340.45 804,526.53 804,526.53 803,356.20 803,356.20 802,914.65 802,914.65 803,594.72 803,594.72 804,748.30 804,748.30 805,303.38 805,303.38 804,075.72 1,541,131.65
103 Kawat Beton Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
104 Kawat Bronjong Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
105 Kawat Las Dos 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 355,497.95
106 Kayu Acuan (Kelas III/Meranti) M3 4,518,743.18 4,518,743.18 4,514,176.27 4,514,176.27 4,507,609.61 4,507,609.61 4,505,132.05 4,505,132.05 4,508,947.96 4,508,947.96 4,515,420.61 4,515,420.61 4,518,535.17 4,518,535.17 4,511,646.79 8,647,247.44
107 Kayu Perancah (Gelam) M3 2,851,829.03 2,851,829.03 2,848,946.80 2,848,946.80 2,844,802.51 2,844,802.51 2,843,238.90 2,843,238.90 2,845,647.15 2,845,647.15 2,849,732.12 2,849,732.12 2,851,697.75 2,851,697.75 2,847,350.42 5,457,373.94
108 Kerb Pracetak Type 1 (Peninggi) Buah 56,233.25 56,233.25 56,176.42 56,176.42 56,094.70 56,094.70 56,063.87 56,063.87 56,111.35 56,111.35 56,191.90 56,191.90 56,230.66 56,230.66 56,144.94 107,610.19
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
110 Marmer Nama Jembatan Buah 617,561.57 617,561.57 616,937.42 616,937.42 616,039.98 616,039.98 615,701.38 615,701.38 616,222.89 616,222.89 617,107.48 617,107.48 617,533.14 617,533.14 616,591.73 1,181,790.48
111 Mata Kucing Buah 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
112 Matras Concrete (Tebal=10 cm) M2 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
113 Mini Pile 16×16×16 M' 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 267,103.87
114 Mini Timber Pile Buah 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
115 Multipleks 12 mm Lbr 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
116 Paku Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
117 Paving Block (Model Bata 8 cm) M2 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 68,449,921.67 68,449,921.67 68,380,742.21 68,380,742.21 68,281,270.39 68,281,270.39 68,243,740.34 68,243,740.34 68,301,543.63 68,301,543.63 68,399,591.43 68,399,591.43 68,446,770.76 68,446,770.76 68,342,425.64 130,988,504.16
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 96,970,220.28 96,970,220.28 96,872,216.56 96,872,216.56 96,731,298.88 96,731,298.88 96,678,131.58 96,678,131.58 96,760,019.15 96,760,019.15 96,898,919.48 96,898,919.48 96,965,756.51 96,965,756.51 96,817,935.02 185,566,086.76
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 185,338,761.88 185,338,761.88 185,151,447.79 185,151,447.79 184,882,112.43 184,882,112.43 184,780,494.00 184,780,494.00 184,937,005.37 184,937,005.37 185,202,484.98 185,202,484.98 185,330,230.30 185,330,230.30 185,047,699.73 354,671,657.62
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 243,042,108.11 243,042,108.11 242,796,475.66 242,796,475.66 242,443,285.48 242,443,285.48 242,310,029.18 242,310,029.18 242,515,268.77 242,515,268.77 242,863,402.77 242,863,402.77 243,030,920.30 243,030,920.30 242,660,426.70 465,095,085.77
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 309,814,069.81 309,814,069.81 309,500,953.75 309,500,953.75 309,050,730.17 309,050,730.17 308,880,863.81 308,880,863.81 309,142,489.73 309,142,489.73 309,586,268.01 309,586,268.01 309,799,808.33 309,799,808.33 309,327,527.49 592,872,578.71
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 373,790,435.73 373,790,435.73 373,412,661.45 373,412,661.45 372,869,467.04 372,869,467.04 372,664,523.42 372,664,523.42 372,980,174.88 372,980,174.88 373,515,593.04 373,515,593.04 373,773,229.27 373,773,229.27 373,203,422.80 715,300,307.91
124 Pelat Rambu (Eng. Grade) Buah 215,895.51 215,895.51 215,677.31 215,677.31 215,363.57 215,363.57 215,245.20 215,245.20 215,427.51 215,427.51 215,736.76 215,736.76 215,885.57 215,885.57 215,556.46 413,146.27
125 Pelat Rambu (High L Grade) Buah 252,045.45 252,045.45 251,790.72 251,790.72 251,424.45 251,424.45 251,286.25 251,286.25 251,499.10 251,499.10 251,860.13 251,860.13 252,033.85 252,033.85 251,649.63 482,324.25
126 Pemantul Cahaya (Reflector) Buah 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
127 Pipa Baja D10" Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
128 Pipa Drainase Baja Dia 3" M' 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
129 Pipa Galvanis Dia 1,5" M' 112,466.50 112,466.50 112,352.83 112,352.83 112,189.39 112,189.39 112,127.73 112,127.73 112,222.70 112,222.70 112,383.80 112,383.80 112,461.32 112,461.32 112,289.88 215,220.38
130 Pipa Galvanis Dia 2" M' 324,345.34 324,345.34 324,017.54 324,017.54 323,546.20 323,546.20 323,368.37 323,368.37 323,642.26 323,642.26 324,106.86 324,106.86 324,330.41 324,330.41 323,835.98 620,680.20
131 Pipa Galvanis Dia 3" M' 248,028.79 248,028.79 247,778.12 247,778.12 247,417.68 247,417.68 247,281.69 247,281.69 247,491.14 247,491.14 247,846.42 247,846.42 248,017.37 248,017.37 247,639.28 474,637.80
132 Pipa Porus M' 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
133 Pipa PVC Dia 4" M' 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
134 Plastik Filter M2 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
135 Rel Pengaman M' 174,724.74 174,724.74 174,548.15 174,548.15 174,294.24 174,294.24 174,198.44 174,198.44 174,345.99 174,345.99 174,596.26 174,596.26 174,716.69 174,716.69 174,450.34 334,360.23
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,114,771.81 2,114,771.81 2,112,634.50 2,112,634.50 2,109,561.30 2,109,561.30 2,108,401.80 2,108,401.80 2,110,187.64 2,110,187.64 2,113,216.85 2,113,216.85 2,114,674.46 2,114,674.46 2,111,450.70 4,046,911.80
137 Strip Bearing Buah 324,345.34 324,345.34 324,017.54 324,017.54 323,546.20 323,546.20 323,368.37 323,368.37 323,642.26 323,642.26 324,106.86 324,106.86 324,330.41 324,330.41 323,835.98 620,680.20
138 Tiang Pancang Baja Diameter 400 M' 749,107.20 749,107.20 748,350.11 748,350.11 747,261.50 747,261.50 746,850.78 746,850.78 747,483.37 747,483.37 748,556.39 748,556.39 749,072.72 749,072.72 747,930.78 1,433,521.46
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 915,798.62 915,798.62 914,873.06 914,873.06 913,542.21 913,542.21 913,040.10 913,040.10 913,813.45 913,813.45 915,125.24 915,125.24 915,756.46 915,756.46 914,360.42 1,752,508.81
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,914,942.94 1,914,942.94 1,913,007.59 1,913,007.59 1,910,224.78 1,910,224.78 1,909,174.85 1,909,174.85 1,910,791.94 1,910,791.94 1,913,534.91 1,913,534.91 1,914,854.79 1,914,854.79 1,911,935.65 3,664,511.30
HARGA SATUAN DASAR UPAH KOTA SURABAYA TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 123,808 123,808 124,142.98 124,142.98 124,314.12 124,314.12 124,317.58 124,317.58 124,153.39 124,153.39 123,976.05 123,976.05 123,949.21 123,949.21 124,094.72 124,094.72 124,275.20 124,275.20
2 Tukang OH 133,232 135,000 133,592.48 135,365.26 133,776.65 135,551.88 133,780.37 135,555.65 133,603.68 135,376.61 133,412.84 135,183.24 133,383.96 135,153.98 133,540.54 135,312.64 133,734.76 135,509.43
3 Mandor OH 152,632 155,000 153,044.97 155,419.38 153,255.96 155,633.64 153,260.22 155,637.97 153,057.80 155,432.41 152,839.17 155,210.39 152,806.09 155,176.79 152,985.47 155,358.96 153,207.96 155,584.90
4 Operator OH 250,000 320,000 250,676.41 320,865.81 251,021.99 321,308.15 251,028.98 321,317.10 250,697.43 320,892.72 250,339.34 320,434.35 250,285.14 320,364.98 250,578.96 320,741.07 250,943.39 321,207.54
5 Pembantu Operator OH 150,000 200,000 150,405.85 200,541.13 150,613.20 200,817.59 150,617.39 200,823.18 150,418.46 200,557.95 150,203.60 200,271.47 150,171.09 200,228.11 150,347.38 200,463.17 150,566.03 200,754.71
6 Sopir OH 166,000 150,000 166,449.14 150,405.85 166,678.60 150,613.20 166,683.24 150,617.39 166,463.10 150,418.46 166,225.32 150,203.60 166,189.34 150,171.09 166,384.43 150,347.38 166,626.41 150,566.03
7 Pembantu Sopir OH 157,000 130,000 157,424.79 130,351.73 157,641.81 130,531.44 157,646.20 130,535.07 157,437.99 130,362.67 157,213.10 130,176.45 157,179.07 130,148.27 157,363.59 130,301.06 157,592.45 130,490.56
8 Mekanik OH 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
9 Pembantu Mekanik OH 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
10 Kepala Tukang OH 180,000 150,000 180,487.02 150,405.85 180,735.83 150,613.20 180,740.87 150,617.39 180,502.15 150,418.46 180,244.32 150,203.60 180,205.30 150,171.09 180,416.85 150,347.38 180,679.24 150,566.03
11 Pemasak Aspal OH 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03

HARGA SATUAN DASAR ALAT KOTA SURABAYA TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 471,000 526,000 472,274.36 527,423.17 472,925.43 528,150.27 472,938.60 528,164.98 472,313.97 527,467.40 471,639.31 526,713.96 471,537.21 526,599.94 472,090.76 527,218.13 472,777.34 527,984.89
2 Asphalt Distribution Unit/Jam 290,000 373,000 290,784.64 374,009.21 291,185.51 374,524.81 291,193.62 374,535.24 290,809.02 374,040.57 290,393.63 373,506.29 290,330.77 373,425.43 290,671.59 373,863.81 291,094.33 374,407.53
3 Asphalt Finisher Unit/Jam 213,000 1,010,000 213,576.30 1,012,732.71 213,870.74 1,014,128.85 213,876.69 1,014,157.08 213,594.21 1,012,817.64 213,289.11 1,011,370.91 213,242.94 1,011,151.98 213,493.27 1,012,339.00 213,803.77 1,013,811.28
4 Asphalt Liquid Mixer Unit/Jam 76,000 139,000 76,205.63 139,376.09 76,310.69 139,568.23 76,312.81 139,572.11 76,212.02 139,387.77 76,103.16 139,188.67 76,086.68 139,158.54 76,176.00 139,321.90 76,286.79 139,524.52
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
6 Asphalt Mixing Plant Unit/Jam 1,140,000 5,847,599 1,143,084.44 5,863,420.58 1,144,660.29 5,871,503.82 1,144,692.15 5,871,667.27 1,143,180.30 5,863,912.27 1,141,547.37 5,855,536.18 1,141,300.25 5,854,268.61 1,142,640.06 5,861,141.10 1,144,301.84 5,869,665.19
7 Asphalt Sprayer Unit/Jam 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
8 Asphalt Tanker Unit/Jam 440,000 510,000 441,190.49 511,379.88 441,798.71 512,084.87 441,811.01 512,099.12 441,227.49 511,422.77 440,597.23 510,692.24 440,501.85 510,581.69 441,018.97 511,181.08 441,660.36 511,924.51
9 Blending Equipment Unit/Jam 143,000 226,000 143,386.91 226,611.48 143,584.58 226,923.88 143,588.58 226,930.20 143,398.93 226,630.48 143,194.10 226,306.76 143,163.10 226,257.77 143,331.17 226,523.38 143,539.62 226,852.82
10 Bore Pile Machine Unit/Jam 394,000 685,000 395,066.03 686,853.37 395,610.66 687,800.26 395,621.67 687,819.41 395,099.16 686,910.97 394,534.79 685,929.78 394,449.39 685,781.29 394,912.44 686,586.35 395,486.78 687,584.88
11 Bore Pile Machine Dia 60 Unit/Jam 258,000 780,000 258,698.06 782,110.41 259,054.70 783,188.62 259,061.91 783,210.42 258,719.75 782,176.00 258,350.19 781,058.73 258,294.27 780,889.65 258,597.49 781,806.35 258,973.58 782,943.37
12 Bore Pile Machine Dia 80 Unit/Jam 1,020,000 1,020,000 1,022,759.77 1,022,759.77 1,024,169.73 1,024,169.73 1,024,198.24 1,024,198.24 1,022,845.53 1,022,845.53 1,021,384.49 1,021,384.49 1,021,163.38 1,021,163.38 1,022,362.16 1,022,362.16 1,023,849.02 1,023,849.02
13 Bulldozer 100-150 HP Unit/Jam 400,000 580,000 401,082.26 581,569.28 401,635.19 582,371.02 401,646.37 582,387.24 401,115.90 581,618.05 400,542.94 580,787.26 400,456.23 580,661.53 400,926.34 581,343.19 401,509.42 582,188.66
14 Cement Tanker Unit/Jam 372,000 480,000 373,006.50 481,298.71 373,520.73 481,962.23 373,531.12 481,975.64 373,037.78 481,339.07 372,504.93 480,651.52 372,424.29 480,547.47 372,861.49 481,111.60 373,403.76 481,811.30
15 Cold Milling Unit/Jam 581,000 1,391,721 582,571.98 1,395,486.51 583,375.11 1,397,410.32 583,391.35 1,397,449.22 582,620.84 1,395,603.54 581,788.61 1,393,610.04 581,662.67 1,393,308.36 582,345.50 1,394,944.00 583,192.43 1,396,972.72
16 Cold Recycler Unit/Jam 4,893,000 4,893,000 4,906,238.76 4,906,238.76 4,913,002.45 4,913,002.45 4,913,139.21 4,913,139.21 4,906,650.19 4,906,650.19 4,899,641.47 4,899,641.47 4,898,580.82 4,898,580.82 4,904,331.40 4,904,331.40 4,911,463.97 4,911,463.97
17 Compressor 4000-6500 L\M Unit/Jam 149,000 153,194 149,403.14 153,608.49 149,609.11 153,820.25 149,613.27 153,824.53 149,415.67 153,621.37 149,202.24 153,401.94 149,169.95 153,368.73 149,345.06 153,548.77 149,562.26 153,772.08
18 Concrete Breaker Unit/Jam 543,000 1,035,000 544,469.17 1,037,800.35 545,219.77 1,039,231.05 545,234.95 1,039,259.98 544,514.83 1,037,887.38 543,737.04 1,036,404.85 543,619.33 1,036,180.49 544,257.50 1,037,396.89 545,049.04 1,038,905.62
19 Concrete Mixer (350) Unit/Jam 101,000 101,000 101,273.27 101,273.27 101,412.89 101,412.89 101,415.71 101,415.71 101,281.76 101,281.76 101,137.09 101,137.09 101,115.20 101,115.20 101,233.90 101,233.90 101,381.13 101,381.13
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
21 Concrete Pan Mixer Unit/Jam 306,000 655,000 306,827.93 656,772.20 307,250.92 657,677.62 307,259.47 657,695.93 306,853.66 656,827.28 306,415.35 655,889.06 306,349.02 655,747.07 306,708.65 656,516.87 307,154.71 657,471.67
22 Concrete Pump Unit/Jam 233,000 250,000 233,630.42 250,676.41 233,952.50 251,021.99 233,959.01 251,028.98 233,650.01 250,697.43 233,316.26 250,339.34 233,265.75 250,285.14 233,539.59 250,578.96 233,879.24 250,943.39
23 Concrete Vibrator Unit/Jam 87,000 87,000 87,235.39 87,235.39 87,355.65 87,355.65 87,358.09 87,358.09 87,242.71 87,242.71 87,118.09 87,118.09 87,099.23 87,099.23 87,201.48 87,201.48 87,328.30 87,328.30
24 Crane 10-15 Ton Unit/Jam 312,000 380,406 312,844.16 381,435.25 313,275.45 381,961.09 313,284.17 381,971.72 312,870.40 381,467.23 312,423.49 380,922.34 312,355.86 380,839.88 312,722.54 381,286.96 313,177.35 381,841.48
25 Crane On Track 35 Ton Unit/Jam 259,000 492,000 259,700.76 493,331.18 260,058.78 494,011.28 260,066.02 494,025.03 259,722.54 493,372.55 259,351.55 492,667.81 259,295.41 492,561.16 259,599.80 493,139.39 259,977.35 493,856.59
26 Crane On Track 75-100 Ton Unit/Jam 407,000 617,000 408,101.20 618,669.39 408,663.80 619,522.28 408,675.18 619,539.52 408,135.42 618,721.27 407,552.44 617,837.48 407,464.21 617,703.73 407,942.55 618,428.87 408,535.83 619,328.28
27 Dump Truck 10 Ton Unit/Jam 385,000 414,000 386,041.68 415,120.14 386,573.87 415,692.42 386,584.63 415,703.99 386,074.05 415,154.95 385,522.58 414,561.94 385,439.12 414,472.20 385,891.60 414,958.76 386,452.82 415,562.25
28 Dump Truck 3-4 M3 Unit/Jam 210,000 275,000 210,568.19 275,744.05 210,858.47 276,124.19 210,864.34 276,131.88 210,585.85 275,767.18 210,285.04 275,373.27 210,239.52 275,313.66 210,486.33 275,636.86 210,792.44 276,037.73
29 Excavator 80-140 HP Unit/Jam 304,000 483,000 304,822.52 484,306.83 305,242.74 484,974.49 305,251.24 484,987.99 304,848.08 484,347.44 304,412.63 483,655.60 304,346.73 483,550.90 304,704.02 484,118.55 305,147.16 484,822.62
30 Flat Bed Truck 3-4 M3 Unit/Jam 369,000 493,000 369,998.39 494,333.89 370,508.46 495,015.37 370,518.78 495,029.15 370,029.41 494,375.34 369,500.86 493,669.17 369,420.87 493,562.30 369,854.54 494,141.71 370,392.44 494,860.36
31 Fulvi Mixer Unit/Jam 924,000 1,443,000 926,500.02 1,446,904.26 927,777.29 1,448,898.94 927,803.11 1,448,939.28 926,577.72 1,447,025.59 925,254.18 1,444,958.64 925,053.89 1,444,645.85 926,139.84 1,446,341.76 927,486.76 1,448,445.23
32 Generator Set Unit/Jam 411,000 546,207 412,112.02 547,684.85 412,680.16 548,439.88 412,691.64 548,455.15 412,146.58 547,730.77 411,557.87 546,948.39 411,468.78 546,829.99 411,951.81 547,471.93 412,550.93 548,268.14
33 Hot Recycler Unit/Jam 3,019,000 8,853,000 3,027,168.37 8,876,953.15 3,031,341.59 8,889,190.81 3,031,425.97 8,889,438.27 3,027,422.22 8,877,697.56 3,023,097.81 8,865,016.54 3,022,443.39 8,863,097.49 3,025,991.52 8,873,502.13 3,030,392.34 8,886,407.21
34 Jack Hammer Unit/Jam 57,000 57,000 57,154.22 57,154.22 57,233.01 57,233.01 57,234.61 57,234.61 57,159.02 57,159.02 57,077.37 57,077.37 57,065.01 57,065.01 57,132.00 57,132.00 57,215.09 57,215.09
35 Launching Gantry Unit/Jam 72,539,000 72,539,000 72,735,265.38 72,735,265.38 72,835,537.38 72,835,537.38 72,837,564.94 72,837,564.94 72,741,364.86 72,741,364.86 72,637,460.14 72,637,460.14 72,621,735.98 72,621,735.98 72,706,988.68 72,706,988.68 72,812,729.34 72,812,729.34
36 Motor Grader > 100 HP Unit/Jam 285,000 523,172 285,771.11 524,587.52 286,165.07 525,310.71 286,173.04 525,325.34 285,795.08 524,631.51 285,386.84 523,882.12 285,325.06 523,768.72 285,660.01 524,383.58 286,075.46 525,146.21
37 Pedestrian Roller Unit/Jam 94,000 94,000 94,254.33 94,254.33 94,384.27 94,384.27 94,386.90 94,386.90 94,262.24 94,262.24 94,127.59 94,127.59 94,107.21 94,107.21 94,217.69 94,217.69 94,354.71 94,354.71
38 Pile Driver + Hammer Unit/Jam 107,000 313,000 107,289.50 313,846.87 107,437.41 314,279.54 107,440.40 314,288.28 107,298.50 313,873.19 107,145.24 313,424.85 107,122.04 313,357.00 107,247.79 313,724.86 107,403.77 314,181.12
39 Rock Drill Breaker Unit/Jam 104,000 338,000 104,281.39 338,914.51 104,425.15 339,381.73 104,428.06 339,391.18 104,290.13 338,942.93 104,141.16 338,458.78 104,118.62 338,385.51 104,240.85 338,782.75 104,392.45 339,275.46
40 Split Form Paver Unit/Jam 220,000 220,000 220,595.24 220,595.24 220,899.35 220,899.35 220,905.50 220,905.50 220,613.74 220,613.74 220,298.61 220,298.61 220,250.93 220,250.93 220,509.48 220,509.48 220,830.18 220,830.18
41 Stone Crusher Unit/Jam 589,000 734,000 590,593.63 735,985.95 591,407.82 737,000.57 591,424.28 737,021.09 590,643.16 736,047.67 589,799.47 734,996.29 589,671.80 734,837.18 590,364.03 735,699.83 591,222.62 736,769.78
42 Tamper Unit/Jam 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
43 Tandem Roller 6-8 T Unit/Jam 425,000 496,000 426,149.90 497,342.00 426,737.39 498,027.63 426,749.27 498,041.50 426,185.64 497,383.71 425,576.87 496,673.24 425,484.74 496,565.72 425,984.23 497,148.66 426,603.76 497,871.68
44 Three Wheel Roller 6-8 T Unit/Jam 141,000 185,598 141,381.50 186,100.16 141,576.40 186,356.72 141,580.35 186,361.91 141,393.35 186,115.77 141,191.39 185,849.92 141,160.82 185,809.69 141,326.53 186,027.82 141,532.07 186,298.36
45 Tire Roller 8-10 T Unit/Jam 252,000 455,000 252,681.82 456,231.07 253,030.17 456,860.03 253,037.21 456,872.74 252,703.01 456,269.33 252,342.05 455,617.59 252,287.42 455,518.96 252,583.59 456,053.71 252,950.93 456,716.96
46 Track Loader 75-100 HP Unit/Jam 236,000 416,492 236,638.53 417,618.88 236,964.76 418,194.61 236,971.36 418,206.25 236,658.38 417,653.90 236,320.33 417,057.32 236,269.18 416,967.04 236,546.54 417,456.53 236,890.56 418,063.65
47 Trailer 20 Ton Unit/Jam 381,000 527,000 382,030.85 528,425.88 382,557.52 529,154.36 382,568.17 529,169.09 382,062.89 528,470.19 381,517.15 527,715.32 381,434.56 527,601.08 381,882.33 528,220.45 382,437.72 528,988.66
48 Trailler 15 Ton Unit/Jam 330,000 502,000 330,892.87 503,358.24 331,349.03 504,052.16 331,358.25 504,066.19 330,920.61 503,400.45 330,447.92 502,681.39 330,376.39 502,572.57 330,764.23 503,162.55 331,245.27 503,894.32
49 Truck Mixer (agitator) Unit/Jam 415,000 610,000 416,122.85 611,650.45 416,696.51 612,493.66 416,708.11 612,510.71 416,157.74 611,701.74 415,563.30 610,827.98 415,473.34 610,695.75 415,961.07 611,412.66 416,566.02 612,301.86
50 Vibrating Rammer Unit/Jam 85,000 85,000 85,229.98 85,229.98 85,347.48 85,347.48 85,349.85 85,349.85 85,237.13 85,237.13 85,115.37 85,115.37 85,096.95 85,096.95 85,196.85 85,196.85 85,320.75 85,320.75
51 Vibratory Roller 5-8 T Unit/Jam 205,000 440,000 205,554.66 441,190.49 205,838.03 441,798.71 205,843.76 441,811.01 205,571.90 441,227.49 205,278.25 440,597.23 205,233.82 440,501.85 205,474.75 441,018.97 205,773.58 441,660.36
52 Water Pump 70-100 MM Unit/Jam 64,000 64,000 64,173.16 64,173.16 64,261.63 64,261.63 64,263.42 64,263.42 64,178.54 64,178.54 64,086.87 64,086.87 64,073.00 64,073.00 64,148.21 64,148.21 64,241.51 64,241.51
53 Water Tanker 3000-4500 L Unit/Jam 232,000 232,000 232,627.71 232,627.71 232,948.41 232,948.41 232,954.89 232,954.89 232,647.22 232,647.22 232,314.90 232,314.90 232,264.61 232,264.61 232,537.27 232,537.27 232,875.46 232,875.46
54 Welding Set Unit/Jam 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 226,000 428,348 226,611.48 429,506.96 226,923.88 430,099.07 226,930.20 430,111.05 226,630.48 429,542.98 226,306.76 428,929.41 226,257.77 428,836.56 226,523.38 429,339.99 226,852.82 429,964.39
HARGA SATUAN DASAR BAHAN KOTA SURABAYA TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28 315,729.49 315,729.49 316,188.67 316,188.67
2 Agregat Pecah Mesin 20-30 mm M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 315,000 344,000 315,852.28 344,930.74 316,287.71 345,406.26 316,296.52 345,415.88 315,878.77 344,959.67 315,427.56 344,466.93 315,359.28 344,392.36 315,729.49 344,796.65 316,188.67 345,298.10
4 Bahan Agr. Base Kelas A M3 330,000 330,000 330,892.87 330,892.87 331,349.03 331,349.03 331,358.25 331,358.25 330,920.61 330,920.61 330,447.92 330,447.92 330,376.39 330,376.39 330,764.23 330,764.23 331,245.27 331,245.27
5 Bahan Agr. Base Kelas B M3 310,000 310,000 310,838.75 310,838.75 311,267.27 311,267.27 311,275.94 311,275.94 310,864.82 310,864.82 310,420.78 310,420.78 310,353.58 310,353.58 310,717.91 310,717.91 311,169.80 311,169.80
6 Bahan Agr. Base Kelas C M3 285,000 285,000 285,771.11 285,771.11 286,165.07 286,165.07 286,173.04 286,173.04 285,795.08 285,795.08 285,386.84 285,386.84 285,325.06 285,325.06 285,660.01 285,660.01 286,075.46 286,075.46
7 Bahan Agr. Base Kelas C2 M3 260,000 260,000 260,703.47 260,703.47 261,062.87 261,062.87 261,070.14 261,070.14 260,725.33 260,725.33 260,352.91 260,352.91 260,296.55 260,296.55 260,602.12 260,602.12 260,981.12 260,981.12
8 Bahan Agr. Base Kelas S M3 211,000 211,000 211,570.89 211,570.89 211,862.56 211,862.56 211,868.46 211,868.46 211,588.63 211,588.63 211,286.40 211,286.40 211,240.66 211,240.66 211,488.64 211,488.64 211,796.22 211,796.22
9 Bahan Pilihan M3 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52 210,486.33 210,486.33 210,792.44 210,792.44
10 Bahan Tanah Timbunan M3 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
11 Batu Belah/Kerakal M3 150,000 339,000 150,405.85 339,917.22 150,613.20 340,385.82 150,617.39 340,395.30 150,418.46 339,945.72 150,203.60 339,460.14 150,171.09 339,386.65 150,347.38 339,785.07 150,566.03 340,279.23
12 Batu Kali M3 350,000 374,000 350,946.98 375,011.91 351,430.79 375,528.90 351,440.57 375,539.36 350,976.41 375,043.36 350,475.07 374,507.65 350,399.20 374,426.57 350,810.54 374,866.12 351,320.74 375,411.31
13 Chipping M3 223,000 223,000 223,603.36 223,603.36 223,911.62 223,911.62 223,917.85 223,917.85 223,622.11 223,622.11 223,302.69 223,302.69 223,254.35 223,254.35 223,516.43 223,516.43 223,841.50 223,841.50
14 Chipping (kg) Kg 288 288 288.78 288.78 289.18 289.18 289.19 289.19 288.80 288.80 288.39 288.39 288.33 288.33 288.67 288.67 289.09 289.09
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 300,000 399,000 300,811.70 400,079.56 301,226.39 400,631.10 301,234.78 400,642.25 300,836.92 400,113.11 300,407.20 399,541.58 300,342.17 399,455.09 300,694.75 399,924.02 301,132.06 400,505.65
18 Kapur M3 100,000 100,000 100,270.57 100,270.57 100,408.80 100,408.80 100,411.59 100,411.59 100,278.97 100,278.97 100,135.73 100,135.73 100,114.06 100,114.06 100,231.58 100,231.58 100,377.35 100,377.35
19 Pasir Beton (Kasar) M3 475,000 475,000 476,285.19 476,285.19 476,941.79 476,941.79 476,955.06 476,955.06 476,325.13 476,325.13 475,644.74 475,644.74 475,541.77 475,541.77 476,100.02 476,100.02 476,792.43 476,792.43
20 Pasir Halus (untuk HRS) M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17 300,694.75 300,694.75 301,132.06 301,132.06
21 Pasir Pasang (Sedang) M3 266,000 336,000 266,719.70 336,909.10 267,087.40 337,373.56 267,094.84 337,382.95 266,742.07 336,937.35 266,361.05 336,456.07 266,303.39 336,383.23 266,616.01 336,778.12 267,003.76 337,267.91
22 Pasir Urug M3 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68 204,472.43 204,472.43 204,769.80 204,769.80
23 Pasir Urug (ada unsur lempung) M3 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
24 Sirtu M3 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79 155,358.96 155,358.96 155,584.90 155,584.90
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
26 Anti Pengelupas Liter 101,000 101,000 101,273.27 101,273.27 101,412.89 101,412.89 101,415.71 101,415.71 101,281.76 101,281.76 101,137.09 101,137.09 101,115.20 101,115.20 101,233.90 101,233.90 101,381.13 101,381.13
27 Arbocell Kg 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96 142,328.85 142,328.85 142,535.84 142,535.84
28 Asbuton Curah Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
30 Aspal Emulsi (CSS-1) Kg 9,000 10,000 9,024.35 10,027.06 9,036.79 10,040.88 9,037.04 10,041.16 9,025.11 10,027.90 9,012.22 10,013.57 9,010.27 10,011.41 9,020.84 10,023.16 9,033.96 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93 156,361.27 156,361.27 156,588.67 156,588.67
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
40 Beton B-0 M3 590,000 693,000 591,596.34 694,875.02 592,411.90 695,832.96 592,428.39 695,852.33 591,645.95 694,933.29 590,800.83 693,940.64 590,672.94 693,790.42 591,366.35 694,604.88 592,226.39 695,615.07
41 Beton K-125 (fc' 10 MPa) M3 610,000 726,000 611,650.45 727,964.30 612,493.66 728,967.87 612,510.71 728,988.16 611,701.74 728,025.35 610,827.98 726,985.43 610,695.75 726,828.06 611,412.66 727,681.30 612,301.86 728,739.60
42 Beton K-175 (fc' 15 MPa) M3 660,000 754,000 661,785.73 756,040.06 662,698.06 757,082.33 662,716.51 757,103.41 661,841.23 756,103.46 660,895.84 755,023.43 660,752.78 754,859.99 661,528.45 755,746.14 662,490.54 756,845.25
43 Beton K-250 (fc' 20 MPa) M3 735,000 925,000 736,988.66 927,502.73 738,004.66 928,781.37 738,025.20 928,807.23 737,050.46 927,580.51 735,997.65 926,255.54 735,838.32 926,055.03 736,702.14 927,142.15 737,773.56 928,490.53
44 Beton K-300 (fc' 25 MPa) M3 765,000 1,000,000 767,069.82 1,002,705.65 768,127.30 1,004,087.97 768,148.68 1,004,115.92 767,134.15 1,002,789.74 766,038.37 1,001,357.34 765,872.54 1,001,140.57 766,771.62 1,002,315.84 767,886.76 1,003,773.55
45 Beton K-350 (fc' 30 MPa) M3 795,000 1,075,000 797,150.99 1,077,908.58 798,249.94 1,079,394.57 798,272.16 1,079,424.62 797,217.84 1,077,998.97 796,079.09 1,076,459.14 795,906.76 1,076,226.12 796,841.09 1,077,489.53 797,999.97 1,079,056.56
46 Beton K-400 (fc' 35 MPa) M3 825,000 869,000 827,232.16 871,351.21 828,372.58 872,552.45 828,395.64 872,576.74 827,301.53 871,424.28 826,119.81 870,179.53 825,940.97 869,991.16 826,910.57 871,012.46 828,113.18 872,279.21
47 Beton K-450 (fc' 40 MPa) M3 865,000 865,000 867,340.39 867,340.39 868,536.10 868,536.10 868,560.27 868,560.27 867,413.12 867,413.12 866,174.10 866,174.10 865,986.60 865,986.60 867,003.20 867,003.20 868,264.12 868,264.12
48 Beton K-500 (fc' 45 MPa) M3 900,000 900,000 902,435.09 902,435.09 903,679.17 903,679.17 903,704.33 903,704.33 902,510.76 902,510.76 901,221.61 901,221.61 901,026.52 901,026.52 902,084.26 902,084.26 903,396.19 903,396.19
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
51 Cat Anti Karat Kg 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
52 Cat Marka (Non Thermoplas) Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14 65,150.53 65,150.53 65,245.28 65,245.28
53 Cat Marka (Thermoplastic) Kg 44,400 44,400 44,520.13 44,520.13 44,581.51 44,581.51 44,582.75 44,582.75 44,523.86 44,523.86 44,460.27 44,460.27 44,450.64 44,450.64 44,502.82 44,502.82 44,567.55 44,567.55
54 Cerucuk Diameter 10-15 cm M' 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
55 Cold Mix (Aspal Dingin) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,305,000 1,305,000 1,308,530.88 1,308,530.88 1,310,334.80 1,310,334.80 1,310,371.28 1,310,371.28 1,308,640.61 1,308,640.61 1,306,771.33 1,306,771.33 1,306,488.45 1,306,488.45 1,308,022.17 1,308,022.17 1,309,924.48 1,309,924.48
57 Curing Compound Liter 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03 50,115.79 50,115.79 50,188.68 50,188.68
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 610,000 610,000 611,650.45 611,650.45 612,493.66 612,493.66 612,510.71 612,510.71 611,701.74 611,701.74 610,827.98 610,827.98 610,695.75 610,695.75 611,412.66 611,412.66 612,301.86 612,301.86
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 710,000 710,000 711,921.01 711,921.01 712,902.46 712,902.46 712,922.31 712,922.31 711,980.71 711,980.71 710,963.71 710,963.71 710,809.81 710,809.81 711,644.25 711,644.25 712,679.22 712,679.22
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 900,000 900,000 902,435.09 902,435.09 903,679.17 903,679.17 903,704.33 903,704.33 902,510.76 902,510.76 901,221.61 901,221.61 901,026.52 901,026.52 902,084.26 902,084.26 903,396.19 903,396.19
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 49,950 49,950 50,085.15 50,085.15 50,154.19 50,154.19 50,155.59 50,155.59 50,089.35 50,089.35 50,017.80 50,017.80 50,006.97 50,006.97 50,065.68 50,065.68 50,138.49 50,138.49
64 Oxygen (Isi 6 M3) Botol 172,000 172,000 172,465.37 172,465.37 172,703.13 172,703.13 172,707.94 172,707.94 172,479.84 172,479.84 172,233.46 172,233.46 172,196.18 172,196.18 172,398.32 172,398.32 172,649.05 172,649.05
65 Polytene 125 Mikron Kg 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80 27,062.53 27,062.53 27,101.89 27,101.89
66 Sand Sheet Ton 1,380,000 1,380,000 1,383,733.80 1,383,733.80 1,385,641.40 1,385,641.40 1,385,679.97 1,385,679.97 1,383,849.84 1,383,849.84 1,381,873.13 1,381,873.13 1,381,573.99 1,381,573.99 1,383,195.86 1,383,195.86 1,385,207.50 1,385,207.50
67 Seal Coat M2 110,000 110,000 110,297.62 110,297.62 110,449.68 110,449.68 110,452.75 110,452.75 110,306.87 110,306.87 110,149.31 110,149.31 110,125.46 110,125.46 110,254.74 110,254.74 110,415.09 110,415.09
68 Seal Guard Kg 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
69 Semen/PC (50 kg) Zak 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26 73,169.06 73,169.06 73,275.47 73,275.47
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 13,500 12,000 13,536.53 12,032.47 13,555.19 12,049.06 13,555.56 12,049.39 13,537.66 12,033.48 13,518.32 12,016.29 13,515.40 12,013.69 13,531.26 12,027.79 13,550.94 12,045.28
78 Baja Tulangan (Polos) U32 Kg 13,500 10,000 13,536.53 10,027.06 13,555.19 10,040.88 13,555.56 10,041.16 13,537.66 10,027.90 13,518.32 10,013.57 13,515.40 10,011.41 13,531.26 10,023.16 13,550.94 10,037.74
79 Baja Tulangan (Polos) U36 Kg 13,500 10,000 13,536.53 10,027.06 13,555.19 10,040.88 13,555.56 10,041.16 13,537.66 10,027.90 13,518.32 10,013.57 13,515.40 10,011.41 13,531.26 10,023.16 13,550.94 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 13,500 10,082 13,536.53 10,109.28 13,555.19 10,123.21 13,555.56 10,123.50 13,537.66 10,110.13 13,518.32 10,095.68 13,515.40 10,093.50 13,531.26 10,105.35 13,550.94 10,120.04
81 Baja Tulangan (Ulir) D19 Kg 13,500 10,082 13,536.53 10,109.28 13,555.19 10,123.21 13,555.56 10,123.50 13,537.66 10,110.13 13,518.32 10,095.68 13,515.40 10,093.50 13,531.26 10,105.35 13,550.94 10,120.04
82 Baja Tulangan (Ulir) D24 Kg 13,500 10,082 13,536.53 10,109.28 13,555.19 10,123.21 13,555.56 10,123.50 13,537.66 10,110.13 13,518.32 10,095.68 13,515.40 10,093.50 13,531.26 10,105.35 13,550.94 10,120.04
83 Baja Tulangan (Ulir) D32 Kg 13,500 12,000 13,536.53 12,032.47 13,555.19 12,049.06 13,555.56 12,049.39 13,537.66 12,033.48 13,518.32 12,016.29 13,515.40 12,013.69 13,531.26 12,027.79 13,550.94 12,045.28
84 Baja Tulangan (Ulir) D36 Kg 13,500 11,000 13,536.53 11,029.76 13,555.19 11,044.97 13,555.56 11,045.28 13,537.66 11,030.69 13,518.32 11,014.93 13,515.40 11,012.55 13,531.26 11,025.47 13,550.94 11,041.51
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,000,000 13,000,000 13,035,173.49 13,035,173.49 13,053,143.63 13,053,143.63 13,053,507.00 13,053,507.00 13,036,266.60 13,036,266.60 13,017,645.43 13,017,645.43 13,014,827.44 13,014,827.44 13,030,105.91 13,030,105.91 13,049,056.11 13,049,056.11
87 Box Culvert Type DUB 200×200 M' 13,800,000 13,800,000 13,837,338.02 13,837,338.02 13,856,414.01 13,856,414.01 13,856,799.74 13,856,799.74 13,838,498.39 13,838,498.39 13,818,731.30 13,818,731.30 13,815,739.90 13,815,739.90 13,831,958.58 13,831,958.58 13,852,074.95 13,852,074.95
88 Box Culvert Type uk 300×200 M' 14,900,000 14,900,000 14,940,314.23 14,940,314.23 14,960,910.78 14,960,910.78 14,961,327.25 14,961,327.25 14,941,567.11 14,941,567.11 14,920,224.38 14,920,224.38 14,916,994.53 14,916,994.53 14,934,506.01 14,934,506.01 14,956,225.85 14,956,225.85
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 194,000 194,000 194,524.90 194,524.90 194,793.07 194,793.07 194,798.49 194,798.49 194,541.21 194,541.21 194,263.32 194,263.32 194,221.27 194,221.27 194,449.27 194,449.27 194,732.07 194,732.07
91 Ducting (Strand Prestress) M' 169,000 169,000 169,457.26 169,457.26 169,690.87 169,690.87 169,695.59 169,695.59 169,471.47 169,471.47 169,229.39 169,229.39 169,192.76 169,192.76 169,391.38 169,391.38 169,637.73 169,637.73
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,176,000 2,176,000 2,181,887.50 2,181,887.50 2,184,895.43 2,184,895.43 2,184,956.25 2,184,956.25 2,182,070.47 2,182,070.47 2,178,953.57 2,178,953.57 2,178,481.89 2,178,481.89 2,181,039.27 2,181,039.27 2,184,211.24 2,184,211.24
94 Expansion Join Tipe Rubber M' 1,575,000 1,575,000 1,579,261.40 1,579,261.40 1,581,438.56 1,581,438.56 1,581,482.58 1,581,482.58 1,579,393.84 1,579,393.84 1,577,137.81 1,577,137.81 1,576,796.40 1,576,796.40 1,578,647.45 1,578,647.45 1,580,943.34 1,580,943.34
95 Expansion Join Tipe Torma M' 1,807,000 1,807,000 1,811,889.12 1,811,889.12 1,814,386.96 1,814,386.96 1,814,437.47 1,814,437.47 1,812,041.06 1,812,041.06 1,809,452.71 1,809,452.71 1,809,061.01 1,809,061.01 1,811,184.72 1,811,184.72 1,813,818.80 1,813,818.80
96 Expansion Tipe Joint Asphaltic Plug M' 2,144,000 2,144,000 2,149,800.92 2,149,800.92 2,152,764.61 2,152,764.61 2,152,824.54 2,152,824.54 2,149,981.20 2,149,981.20 2,146,910.14 2,146,910.14 2,146,445.39 2,146,445.39 2,148,965.16 2,148,965.16 2,152,090.49 2,152,090.49
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
99 Glass Bead Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
100 Joint Sealent Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
101 Joint Socket Pile 16×16×16 Set 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
102 Joint Socket Pile 35×35 Set 782,000 782,000 784,115.82 784,115.82 785,196.79 785,196.79 785,218.65 785,218.65 784,181.58 784,181.58 783,061.44 783,061.44 782,891.93 782,891.93 783,810.99 783,810.99 784,950.91 784,950.91
103 Kawat Beton Kg 25,900 22,000 25,970.08 22,059.52 26,005.88 22,089.94 26,006.60 22,090.55 25,972.25 22,061.37 25,935.16 22,029.86 25,929.54 22,025.09 25,959.98 22,050.95 25,997.73 22,083.02
104 Kawat Bronjong Kg 31,000 34,000 31,083.88 34,091.99 31,126.73 34,138.99 31,127.59 34,139.94 31,086.48 34,094.85 31,042.08 34,046.15 31,035.36 34,038.78 31,071.79 34,078.74 31,116.98 34,128.30
105 Kawat Las Dos 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
106 Kayu Acuan (Kelas III/Meranti) M3 4,300,000 4,300,000 4,311,634.31 4,311,634.31 4,317,578.28 4,317,578.28 4,317,698.47 4,317,698.47 4,311,995.88 4,311,995.88 4,305,836.57 4,305,836.57 4,304,904.46 4,304,904.46 4,309,958.11 4,309,958.11 4,316,226.25 4,316,226.25
107 Kayu Perancah (Gelam) M3 2,770,000 5,228,378 2,777,494.66 5,242,524.18 2,781,323.68 5,249,751.46 2,781,401.11 5,249,897.60 2,777,727.58 5,242,963.81 2,773,759.83 5,235,474.69 2,773,159.39 5,234,341.34 2,776,414.88 5,240,486.08 2,780,452.73 5,248,107.53
108 Kerb Pracetak Type 1 (Peninggi) Buah 39,000 55,000 39,105.52 55,148.81 39,159.43 55,224.84 39,160.52 55,226.38 39,108.80 55,153.44 39,052.94 55,074.65 39,044.48 55,062.73 39,090.32 55,127.37 39,147.17 55,207.55
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 66,000 95,000 66,178.57 95,257.04 66,269.81 95,388.36 66,271.65 95,391.01 66,184.12 95,265.03 66,089.58 95,128.95 66,075.28 95,108.35 66,152.85 95,220.00 66,249.05 95,358.49
110 Marmer Nama Jembatan Buah 587,000 600,000 588,588.22 601,623.39 589,399.64 602,452.78 589,416.05 602,469.55 588,637.58 601,673.84 587,796.76 600,814.40 587,669.52 600,684.34 588,359.40 601,389.50 589,215.07 602,264.13
111 Mata Kucing Buah 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
112 Matras Concrete (Tebal=10 cm) M2 147,000 147,000 147,397.73 147,397.73 147,600.93 147,600.93 147,605.04 147,605.04 147,410.09 147,410.09 147,199.53 147,199.53 147,167.66 147,167.66 147,340.43 147,340.43 147,554.71 147,554.71
113 Mini Pile 16×16×16 M' 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12 136,314.95 136,314.95 136,513.20 136,513.20
114 Mini Timber Pile Buah 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50 32,074.11 32,074.11 32,120.75 32,120.75
115 Multipleks 12 mm Lbr 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49 160,370.53 160,370.53 160,603.77 160,603.77
116 Paku Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
117 Paving Block (Model Bata 8 cm) M2 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35 95,220.00 95,220.00 95,358.49 95,358.49
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,478,000 66,478,000 66,657,866.42 66,657,866.42 66,749,760.19 66,749,760.19 66,751,618.33 66,751,618.33 66,663,456.25 66,663,456.25 66,568,233.30 66,568,233.30 66,553,822.97 66,553,822.97 66,631,952.37 66,631,952.37 66,728,857.87 66,728,857.87
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,178,000 94,178,000 94,432,813.02 94,432,813.02 94,562,997.00 94,562,997.00 94,565,629.40 94,565,629.40 94,440,732.01 94,440,732.01 94,305,831.63 94,305,831.63 94,285,416.83 94,285,416.83 94,396,101.13 94,396,101.13 94,533,385.13 94,533,385.13
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,000,000 180,000,000 180,487,017.59 180,487,017.59 180,735,834.92 180,735,834.92 180,740,866.15 180,740,866.15 180,502,152.97 180,502,152.97 180,244,321.33 180,244,321.33 180,205,303.04 180,205,303.04 180,416,851.10 180,416,851.10 180,679,238.49 180,679,238.49
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,042,000 236,042,000 236,680,647.81 236,680,647.81 237,006,933.03 237,006,933.03 237,013,530.71 237,013,530.71 236,700,495.51 236,700,495.51 236,362,389.42 236,362,389.42 236,311,223.00 236,311,223.00 236,588,635.37 236,588,635.37 236,932,715.63 236,932,715.63
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 300,891,000 300,891,000 301,705,106.73 301,705,106.73 302,121,033.91 302,121,033.91 302,129,444.21 302,129,444.21 301,730,407.28 301,730,407.28 301,299,411.61 301,299,411.61 301,234,187.98 301,234,187.98 301,587,815.24 301,587,815.24 302,026,426.39 302,026,426.39
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 363,024,000 363,024,000 364,006,217.08 364,006,217.08 364,508,031.86 364,508,031.86 364,518,178.85 364,518,178.85 364,036,742.11 364,036,742.11 363,516,747.26 363,516,747.26 363,438,055.17 363,438,055.17 363,864,705.29 363,864,705.29 364,393,888.19 364,393,888.19
124 Pelat Rambu (Eng. Grade) Buah 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52 210,486.33 210,486.33 210,792.44 210,792.44
125 Pelat Rambu (High L Grade) Buah 245,000 245,000 245,662.89 245,662.89 246,001.55 246,001.55 246,008.40 246,008.40 245,683.49 245,683.49 245,332.55 245,332.55 245,279.44 245,279.44 245,567.38 245,567.38 245,924.52 245,924.52
126 Pemantul Cahaya (Reflector) Buah 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
127 Pipa Baja D10" Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
128 Pipa Drainase Baja Dia 3" M' 275,000 275,000 275,744.05 275,744.05 276,124.19 276,124.19 276,131.88 276,131.88 275,767.18 275,767.18 275,373.27 275,373.27 275,313.66 275,313.66 275,636.86 275,636.86 276,037.73 276,037.73
129 Pipa Galvanis Dia 1,5" M' 109,000 109,000 109,294.92 109,294.92 109,445.59 109,445.59 109,448.64 109,448.64 109,304.08 109,304.08 109,147.95 109,147.95 109,124.32 109,124.32 109,252.43 109,252.43 109,411.32 109,411.32
130 Pipa Galvanis Dia 2" M' 141,000 315,000 141,381.50 315,852.28 141,576.40 316,287.71 141,580.35 316,296.52 141,393.35 315,878.77 141,191.39 315,427.56 141,160.82 315,359.28 141,326.53 315,729.49 141,532.07 316,188.67
131 Pipa Galvanis Dia 3" M' 241,000 241,000 241,652.06 241,652.06 241,985.20 241,985.20 241,991.94 241,991.94 241,672.33 241,672.33 241,327.12 241,327.12 241,274.88 241,274.88 241,558.12 241,558.12 241,909.42 241,909.42
132 Pipa Porus M' 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33 45,104.21 45,104.21 45,169.81 45,169.81
133 Pipa PVC Dia 4" M' 119,000 119,000 119,321.97 119,321.97 119,486.47 119,486.47 119,489.79 119,489.79 119,331.98 119,331.98 119,161.52 119,161.52 119,135.73 119,135.73 119,275.58 119,275.58 119,449.05 119,449.05
134 Plastik Filter M2 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
135 Rel Pengaman M' 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90 170,393.69 170,393.69 170,641.50 170,641.50
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,054,000 2,054,000 2,059,557.41 2,059,557.41 2,062,396.69 2,062,396.69 2,062,454.11 2,062,454.11 2,059,730.12 2,059,730.12 2,056,787.98 2,056,787.98 2,056,342.74 2,056,342.74 2,058,756.73 2,058,756.73 2,061,750.87 2,061,750.87
137 Strip Bearing Buah 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28 315,729.49 315,729.49 316,188.67 316,188.67
138 Tiang Pancang Baja Diameter 400 M' 728,000 728,000 729,969.72 729,969.72 730,976.04 730,976.04 730,996.39 730,996.39 730,030.93 730,030.93 728,988.14 728,988.14 728,830.34 728,830.34 729,685.93 729,685.93 730,747.14 730,747.14
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 889,000 889,000 891,405.33 891,405.33 892,634.21 892,634.21 892,659.06 892,659.06 891,480.08 891,480.08 890,206.68 890,206.68 890,013.97 890,013.97 891,058.78 891,058.78 892,354.68 892,354.68
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,860,000 1,860,000 1,865,032.52 1,865,032.52 1,867,603.63 1,867,603.63 1,867,655.62 1,867,655.62 1,865,188.91 1,865,188.91 1,862,524.65 1,862,524.65 1,862,121.46 1,862,121.46 1,864,307.46 1,864,307.46 1,867,018.80 1,867,018.80
HARGA SATUAN DASAR UPAH KOTA SURABAYA TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 124,323.68 124,323.68 124,198.03 124,198.03 124,017.36 124,017.36 123,949.20 123,949.20 124,054.18 124,054.18 124,232.27 124,232.27 124,317.96 124,317.96 124,128.44 124,128.44
2 Tukang OH 133,786.93 135,562.30 133,651.72 135,425.29 133,457.30 135,228.29 133,383.95 135,153.96 133,496.92 135,268.44 133,688.56 135,462.62 133,780.77 135,556.06 133,576.83 135,349.40
3 Mandor OH 153,267.74 155,645.60 153,112.83 155,488.29 152,890.10 155,262.11 152,806.07 155,176.77 152,935.50 155,308.21 153,155.04 155,531.15 153,260.68 155,638.43 153,027.04 155,401.17
4 Operator OH 251,041.29 321,332.85 250,787.57 321,008.09 250,422.76 320,541.13 250,285.11 320,364.95 250,497.11 320,636.30 250,856.70 321,096.58 251,029.73 321,318.06 250,647.04 320,828.22
5 Pembantu Operator OH 150,624.77 200,833.03 150,472.54 200,630.06 150,253.65 200,338.20 150,171.07 200,228.09 150,298.27 200,397.69 150,514.02 200,685.36 150,617.84 200,823.79 150,388.23 200,517.64
6 Sopir OH 166,691.42 150,624.77 166,522.95 150,472.54 166,280.71 150,253.65 166,189.32 150,171.07 166,330.08 150,298.27 166,568.85 150,514.02 166,683.74 150,617.84 166,429.64 150,388.23
7 Pembantu Sopir OH 157,653.93 130,541.47 157,494.59 130,409.54 157,265.49 130,219.83 157,179.05 130,148.26 157,312.18 130,258.50 157,538.01 130,445.48 157,646.67 130,535.46 157,406.34 130,336.46
8 Mekanik OH 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 180,465.87
9 Pembantu Mekanik OH 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 130,336.46
10 Kepala Tukang OH 180,749.73 150,624.77 180,567.05 150,472.54 180,304.38 150,253.65 180,205.28 150,171.07 180,357.92 150,298.27 180,616.82 150,514.02 180,741.41 150,617.84 180,465.87 150,388.23
11 Pemasak Aspal OH 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 150,388.23

HARGA SATUAN DASAR ALAT KOTA SURABAYA TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 472,961.79 528,190.87 472,483.78 527,657.05 471,796.47 526,889.48 471,537.15 526,599.88 471,936.55 527,045.92 472,614.02 527,802.50 472,940.01 528,166.56 472,219.03 960,220.91
2 Asphalt Distribution Unit/Jam 291,207.89 374,553.60 290,913.58 374,175.06 290,490.40 373,630.75 290,330.73 373,425.39 290,576.65 373,741.69 290,993.77 374,278.20 291,194.49 374,536.36 290,750.57 640,481.88
3 Asphalt Finisher Unit/Jam 213,887.18 1,014,206.80 213,671.01 1,013,181.79 213,360.19 1,011,707.93 213,242.92 1,011,151.86 213,423.54 1,012,008.32 213,729.91 1,013,461.07 213,877.33 1,014,160.12 213,551.28 1,208,365.82
4 Asphalt Liquid Mixer Unit/Jam 76,316.55 139,578.96 76,239.42 139,437.89 76,128.52 139,235.05 76,086.67 139,158.52 76,151.12 139,276.39 76,260.44 139,476.33 76,313.04 139,572.53 76,196.70 209,205.46
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
6 Asphalt Mixing Plant Unit/Jam 1,144,748.27 5,871,955.13 1,143,591.32 5,866,020.59 1,141,927.77 5,857,487.43 1,141,300.12 5,854,267.93 1,142,266.82 5,859,226.57 1,143,906.56 5,867,637.57 1,144,695.58 5,871,684.83 1,142,950.52 6,910,419.11
7 Asphalt Sprayer Unit/Jam 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
8 Asphalt Tanker Unit/Jam 441,832.67 512,124.23 441,386.12 511,606.64 440,744.05 510,862.42 440,501.80 510,581.63 440,874.91 511,014.10 441,507.79 511,747.67 441,812.33 512,100.65 441,138.80 915,689.81
9 Blending Equipment Unit/Jam 143,595.62 226,941.32 143,450.49 226,711.96 143,241.82 226,382.17 143,163.09 226,257.74 143,284.35 226,449.39 143,490.03 226,774.46 143,589.01 226,930.88 143,370.11 358,005.13
10 Bore Pile Machine Unit/Jam 395,641.07 687,853.13 395,241.21 687,157.94 394,666.26 686,158.35 394,449.34 685,781.21 394,783.44 686,362.08 395,350.16 687,347.36 395,622.86 687,821.46 395,019.74 1,048,867.71
11 Bore Pile Machine Dia 60 Unit/Jam 259,074.61 783,248.82 258,812.77 782,457.22 258,436.28 781,319.00 258,294.24 780,889.56 258,513.02 781,550.98 258,884.12 782,672.91 259,062.68 783,212.76 258,667.75 1,019,126.55
12 Bore Pile Machine Dia 80 Unit/Jam 1,024,248.45 1,024,248.45 1,023,213.29 1,023,213.29 1,021,724.85 1,021,724.85 1,021,163.27 1,021,163.27 1,022,028.20 1,022,028.20 1,023,495.34 1,023,495.34 1,024,201.31 1,024,201.31 1,022,639.94 1,960,042.75
13 Bulldozer 100-150 HP Unit/Jam 401,666.06 582,415.79 401,260.11 581,827.16 400,676.41 580,980.79 400,456.18 580,661.46 400,795.37 581,153.29 401,370.72 581,987.55 401,647.57 582,388.98 401,035.27 949,110.09
14 Cement Tanker Unit/Jam 373,549.44 481,999.27 373,171.91 481,512.14 372,629.06 480,811.69 372,424.25 480,547.42 372,739.70 480,954.45 373,274.77 481,644.87 373,532.24 481,977.08 372,962.80 823,118.64
15 Cold Milling Unit/Jam 583,419.95 1,397,517.73 582,830.31 1,396,105.32 581,982.49 1,394,074.43 581,662.61 1,393,308.20 582,155.28 1,394,488.35 582,990.97 1,396,490.15 583,393.10 1,397,453.40 582,503.73 1,929,275.01
16 Cold Recycler Unit/Jam 4,913,380.08 4,913,380.08 4,908,414.34 4,908,414.34 4,901,274.18 4,901,274.18 4,898,580.25 4,898,580.25 4,902,729.41 4,902,729.41 4,909,767.35 4,909,767.35 4,913,153.91 4,913,153.91 4,905,663.95 9,402,440.38
17 Compressor 4000-6500 L\M Unit/Jam 149,620.61 153,832.08 149,469.39 153,676.60 149,251.96 153,453.05 149,169.93 153,368.71 149,296.28 153,498.62 149,510.59 153,718.97 149,613.72 153,824.99 149,385.64 290,524.83
18 Concrete Breaker Unit/Jam 545,261.68 1,039,310.93 544,710.60 1,038,260.54 543,918.23 1,036,750.21 543,619.27 1,036,180.37 544,079.72 1,037,058.03 544,860.75 1,038,546.74 545,236.58 1,039,263.09 544,405.38 1,536,707.91
19 Concrete Mixer (350) Unit/Jam 101,420.68 101,420.68 101,318.18 101,318.18 101,170.79 101,170.79 101,115.19 101,115.19 101,200.83 101,200.83 101,346.11 101,346.11 101,416.01 101,416.01 101,261.41 194,082.66
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 220,985.21
21 Concrete Pan Mixer Unit/Jam 307,274.54 657,728.17 306,963.99 657,063.44 306,517.45 656,107.62 306,348.98 655,747.00 306,608.46 656,302.42 307,048.60 657,244.56 307,260.39 657,697.90 306,791.98 937,916.10
22 Concrete Pump Unit/Jam 233,970.48 251,041.29 233,734.02 250,787.57 233,394.01 250,422.76 233,265.73 250,285.11 233,463.31 250,497.11 233,798.45 250,856.70 233,959.71 251,029.73 233,603.05 464,779.26
23 Concrete Vibrator Unit/Jam 87,362.37 87,362.37 87,274.07 87,274.07 87,147.12 87,147.12 87,099.22 87,099.22 87,172.99 87,172.99 87,298.13 87,298.13 87,358.35 87,358.35 87,225.17 167,180.12
24 Crane 10-15 Ton Unit/Jam 313,299.53 381,990.45 312,982.89 381,604.39 312,527.60 381,049.28 312,355.82 380,839.84 312,620.39 381,162.41 313,069.16 381,709.58 313,285.11 381,972.86 312,807.51 668,125.54
25 Crane On Track 35 Ton Unit/Jam 260,078.77 494,049.25 259,815.92 493,549.94 259,437.98 492,831.98 259,295.38 492,561.10 259,515.00 492,978.31 259,887.54 493,685.99 260,066.80 494,026.51 259,670.34 731,300.18
26 Crane On Track 75-100 Ton Unit/Jam 408,695.22 619,569.90 408,282.17 618,943.72 407,688.25 618,043.36 407,464.17 617,703.66 407,809.29 618,226.86 408,394.71 619,114.34 408,676.40 619,541.38 408,053.39 992,639.01
27 Dump Truck 10 Ton Unit/Jam 386,603.58 415,724.37 386,212.86 415,304.22 385,651.04 414,700.08 385,439.08 414,472.15 385,765.55 414,823.21 386,319.32 415,418.70 386,585.79 415,705.24 385,996.45 768,895.12
28 Dump Truck 3-4 M3 Unit/Jam 210,874.68 276,145.42 210,661.56 275,866.33 210,355.12 275,465.03 210,239.50 275,313.63 210,417.57 275,546.82 210,719.63 275,942.37 210,864.97 276,132.70 210,543.52 468,706.45
29 Excavator 80-140 HP Unit/Jam 305,266.21 485,011.77 304,957.69 484,521.59 304,514.07 483,816.76 304,346.70 483,550.84 304,604.48 483,960.41 305,041.75 484,655.15 305,252.15 484,989.44 304,786.81 763,632.89
30 Flat Bed Truck 3-4 M3 Unit/Jam 370,536.94 495,053.42 370,162.45 494,553.09 369,623.99 493,833.68 369,420.83 493,562.24 369,733.73 493,980.30 370,264.49 494,689.41 370,519.88 495,030.63 369,955.04 833,395.22
31 Fulvi Mixer Unit/Jam 927,848.60 1,449,010.31 926,910.86 1,447,545.86 925,562.51 1,445,440.15 925,053.78 1,444,645.68 925,837.31 1,445,869.31 927,166.37 1,447,944.88 927,805.89 1,448,943.61 926,391.48 2,295,911.40
32 Generator Set Unit/Jam 412,711.88 548,482.03 412,294.77 547,927.71 411,695.01 547,130.65 411,468.73 546,829.93 411,817.25 547,293.10 412,408.42 548,078.74 412,692.88 548,456.79 412,063.74 925,338.87
33 Hot Recycler Unit/Jam 3,031,574.59 8,889,874.08 3,028,510.71 8,880,889.46 3,024,105.20 8,867,970.64 3,022,443.04 8,863,096.46 3,025,003.08 8,870,603.61 3,029,345.52 8,883,337.48 3,031,435.04 8,889,464.86 3,026,813.70 11,650,441.65
34 Jack Hammer Unit/Jam 57,237.41 57,237.41 57,179.57 57,179.57 57,096.39 57,096.39 57,065.01 57,065.01 57,113.34 57,113.34 57,195.33 57,195.33 57,234.78 57,234.78 57,147.53 109,531.80
35 Launching Gantry Unit/Jam 72,841,135.87 72,841,135.87 72,767,518.40 72,767,518.40 72,661,665.24 72,661,665.24 72,621,727.55 72,621,727.55 72,683,239.06 72,683,239.06 72,787,576.84 72,787,576.84 72,837,782.82 72,837,782.82 72,726,743.73 139,391,707.06
36 Motor Grader > 100 HP Unit/Jam 286,187.07 525,351.09 285,897.83 524,820.14 285,481.94 524,056.70 285,325.03 523,768.65 285,566.70 524,212.29 285,976.64 524,964.81 286,173.89 525,326.91 285,737.63 786,447.44
37 Pedestrian Roller Unit/Jam 94,391.52 94,391.52 94,296.13 94,296.13 94,158.96 94,158.96 94,107.20 94,107.20 94,186.91 94,186.91 94,322.12 94,322.12 94,387.18 94,387.18 94,243.29 180,631.39
38 Pile Driver + Hammer Unit/Jam 107,445.67 314,303.69 107,337.08 313,986.04 107,180.94 313,529.29 107,122.03 313,356.96 107,212.76 313,622.38 107,366.67 314,072.59 107,440.73 314,289.22 107,276.93 412,145.49
39 Rock Drill Breaker Unit/Jam 104,433.18 339,407.82 104,327.63 339,064.80 104,175.87 338,571.57 104,118.61 338,385.47 104,206.80 338,672.09 104,356.39 339,158.26 104,428.37 339,392.20 104,269.17 434,453.13
40 Split Form Paver Unit/Jam 220,916.33 220,916.33 220,693.06 220,693.06 220,372.03 220,372.03 220,250.90 220,250.90 220,437.46 220,437.46 220,753.90 220,753.90 220,906.16 220,906.16 220,569.40 422,754.32
41 Stone Crusher Unit/Jam 591,453.27 737,057.22 590,855.52 736,312.31 589,996.01 735,241.21 589,671.73 734,837.09 590,171.19 735,459.51 591,018.39 736,515.27 591,426.05 737,023.29 590,524.44 1,277,203.89
42 Tamper Unit/Jam 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
43 Tandem Roller 6-8 T Unit/Jam 426,770.19 498,065.91 426,338.87 497,562.54 425,718.69 496,838.75 425,484.69 496,565.67 425,845.08 496,986.26 426,456.39 497,699.69 426,750.54 498,042.99 426,099.97 887,868.24
44 Three Wheel Roller 6-8 T Unit/Jam 141,587.29 186,371.04 141,444.19 186,182.69 141,238.43 185,911.85 141,160.80 185,809.67 141,280.37 185,967.05 141,483.18 186,234.01 141,580.77 186,362.46 141,364.93 315,660.51
45 Tire Roller 8-10 T Unit/Jam 253,049.62 456,895.14 252,793.87 456,433.38 252,426.14 455,769.42 252,287.39 455,518.91 252,501.09 455,904.74 252,863.55 456,559.20 253,037.97 456,874.11 252,652.22 687,771.26
46 Track Loader 75-100 HP Unit/Jam 236,982.98 418,226.75 236,743.47 417,804.07 236,399.08 417,196.30 236,269.15 416,966.99 236,469.27 417,320.17 236,808.73 417,919.24 236,972.07 418,207.50 236,610.81 634,459.23
47 Trailer 20 Ton Unit/Jam 382,586.92 529,195.03 382,200.26 528,660.20 381,644.28 527,891.17 381,434.51 527,601.02 381,757.59 528,047.91 382,305.61 528,805.93 382,569.31 529,170.67 381,986.10 878,511.49
48 Trailler 15 Ton Unit/Jam 331,374.50 504,090.91 331,039.59 503,581.44 330,558.04 502,848.89 330,376.35 502,572.51 330,656.18 502,998.19 331,130.84 503,720.25 331,359.25 504,067.70 330,854.10 806,576.64
49 Truck Mixer (agitator) Unit/Jam 416,728.54 612,540.74 416,307.37 611,921.67 415,701.78 611,031.53 415,473.29 610,695.68 415,825.20 611,212.95 416,422.12 612,090.35 416,709.35 612,512.55 416,074.09 992,973.07
50 Vibrating Rammer Unit/Jam 85,354.04 85,354.04 85,267.77 85,267.77 85,143.74 85,143.74 85,096.94 85,096.94 85,169.02 85,169.02 85,291.28 85,291.28 85,350.11 85,350.11 85,219.99 163,336.90
51 Vibratory Roller 5-8 T Unit/Jam 205,853.86 441,832.67 205,645.81 441,386.12 205,346.66 440,744.05 205,233.79 440,501.80 205,407.63 440,874.91 205,702.49 441,507.79 205,844.38 441,812.33 205,530.58 629,538.38
52 Water Pump 70-100 MM Unit/Jam 64,266.57 64,266.57 64,201.62 64,201.62 64,108.23 64,108.23 64,072.99 64,072.99 64,127.26 64,127.26 64,219.32 64,219.32 64,263.61 64,263.61 64,165.64 122,983.07
53 Water Tanker 3000-4500 L Unit/Jam 232,966.31 232,966.31 232,730.87 232,730.87 232,392.32 232,392.32 232,264.59 232,264.59 232,461.32 232,461.32 232,795.02 232,795.02 232,955.59 232,955.59 232,600.46 445,813.65
54 Welding Set Unit/Jam 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 226,941.32 430,132.13 226,711.96 429,697.42 226,382.17 429,072.35 226,257.74 428,836.51 226,449.39 429,199.74 226,774.46 429,815.86 226,930.88 430,112.33 226,584.93 637,155.69
HARGA SATUAN DASAR BAHAN KOTA SURABAYA TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46 315,815.28 605,307.32
2 Agregat Pecah Mesin 20-30 mm M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 316,312.02 345,432.81 315,992.34 345,083.70 315,532.67 344,581.71 315,359.24 344,392.32 315,626.36 344,684.02 316,079.44 345,178.82 316,297.46 345,416.91 315,815.28 634,382.38
4 Bahan Agr. Base Kelas A M3 331,374.50 331,374.50 331,039.59 331,039.59 330,558.04 330,558.04 330,376.35 330,376.35 330,656.18 330,656.18 331,130.84 331,130.84 331,359.25 331,359.25 330,854.10 634,131.48
5 Bahan Agr. Base Kelas B M3 311,291.20 311,291.20 310,976.59 310,976.59 310,524.22 310,524.22 310,353.54 310,353.54 310,616.41 310,616.41 311,062.31 311,062.31 311,276.87 311,276.87 310,802.33 595,699.27
6 Bahan Agr. Base Kelas C M3 286,187.07 286,187.07 285,897.83 285,897.83 285,481.94 285,481.94 285,325.03 285,325.03 285,566.70 285,566.70 285,976.64 285,976.64 286,173.89 286,173.89 285,737.63 547,659.00
7 Bahan Agr. Base Kelas C2 M3 261,082.94 261,082.94 260,819.07 260,819.07 260,439.67 260,439.67 260,296.52 260,296.52 260,516.99 260,516.99 260,890.97 260,890.97 261,070.92 261,070.92 260,672.93 499,618.74
8 Bahan Agr. Base Kelas S M3 211,878.85 211,878.85 211,664.71 211,664.71 211,356.81 211,356.81 211,240.64 211,240.64 211,419.56 211,419.56 211,723.06 211,723.06 211,869.09 211,869.09 211,546.11 405,459.82
9 Bahan Pilihan M3 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97 210,543.52 403,538.21
10 Bahan Tanah Timbunan M3 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 230,593.26
11 Batu Belah/Kerakal M3 150,624.77 340,411.99 150,472.54 340,067.95 150,253.65 339,573.26 150,171.07 339,386.61 150,298.27 339,674.08 150,514.02 340,161.69 150,617.84 340,396.32 150,388.23 477,730.75
12 Batu Kali M3 351,457.80 375,557.77 351,102.60 375,178.21 350,591.86 374,632.44 350,399.16 374,426.53 350,695.95 374,743.67 351,199.38 375,281.62 351,441.62 375,540.48 350,905.86 696,625.81
13 Chipping M3 223,928.83 223,928.83 223,702.51 223,702.51 223,377.10 223,377.10 223,254.32 223,254.32 223,443.42 223,443.42 223,764.18 223,764.18 223,918.52 223,918.52 223,577.16 428,519.15
14 Chipping (kg) Kg 289.20 289.20 288.91 288.91 288.49 288.49 288.33 288.33 288.57 288.57 288.99 288.99 289.19 289.19 288.75 553.42
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 301,249.55 400,661.90 300,945.08 400,256.96 300,507.31 399,674.72 300,342.14 399,455.04 300,596.53 399,793.39 301,028.04 400,367.29 301,235.68 400,643.45 300,776.45 675,739.39
18 Kapur M3 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89 100,258.82 192,161.05
19 Pasir Beton (Kasar) M3 476,978.45 476,978.45 476,496.38 476,496.38 475,803.24 475,803.24 475,541.72 475,541.72 475,944.51 475,944.51 476,627.73 476,627.73 476,956.49 476,956.49 476,229.38 912,765.01
20 Pasir Halus (untuk HRS) M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68 300,776.45 576,483.16
21 Pasir Pasang (Sedang) M3 267,107.93 337,399.49 266,837.98 337,058.50 266,449.81 336,568.18 266,303.36 336,383.19 266,528.92 336,668.11 266,911.53 337,151.41 267,095.63 337,383.96 266,688.45 581,329.58
22 Pasir Urug M3 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26 204,527.99 392,008.55
23 Pasir Urug (ada unsur lempung) M3 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
24 Sirtu M3 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43 155,401.17 297,849.63
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
26 Anti Pengelupas Liter 101,420.68 101,420.68 101,318.18 101,318.18 101,170.79 101,170.79 101,115.19 101,115.19 101,200.83 101,200.83 101,346.11 101,346.11 101,416.01 101,416.01 101,261.41 194,082.66
27 Arbocell Kg 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89 142,367.52 272,868.70
28 Asbuton Curah Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
30 Aspal Emulsi (CSS-1) Kg 9,037.49 10,041.65 9,028.35 10,031.50 9,015.22 10,016.91 9,010.26 10,011.40 9,017.90 10,019.88 9,030.84 10,034.27 9,037.07 10,041.19 9,023.29 18,297.08
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
37 Assetilline Botol 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55 156,403.76 299,771.24
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
39 Bensin Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
40 Beton B-0 M3 592,457.44 695,886.45 591,858.67 695,183.15 590,997.70 694,171.88 590,672.87 693,790.34 591,173.18 694,377.99 592,021.81 695,374.77 592,430.17 695,854.42 591,527.02 1,237,016.80
41 Beton K-125 (fc' 10 MPa) M3 612,540.74 729,023.90 611,921.67 728,287.11 611,031.53 727,227.68 610,695.68 726,827.97 611,212.95 727,443.60 612,090.35 728,487.86 612,512.55 728,990.34 611,578.79 1,288,482.66
42 Beton K-175 (fc' 15 MPa) M3 662,749.00 757,140.52 662,079.19 756,375.31 661,116.08 755,275.03 660,752.70 754,859.90 661,312.37 755,499.28 662,261.69 756,583.81 662,718.49 757,105.67 661,708.20 1,362,506.25
43 Beton K-250 (fc' 20 MPa) M3 738,061.39 928,852.76 737,315.46 927,914.01 736,242.90 926,564.20 735,838.24 926,054.92 736,461.50 926,839.30 737,518.70 928,169.79 738,027.41 928,810.01 736,902.31 1,602,875.50
44 Beton K-300 (fc' 25 MPa) M3 768,186.34 1,004,165.15 767,409.97 1,003,150.28 766,293.63 1,001,691.02 765,872.45 1,001,140.46 766,521.15 1,001,988.43 767,621.50 1,003,426.80 768,150.98 1,004,118.93 766,979.95 1,705,640.29
45 Beton K-350 (fc' 30 MPa) M3 798,311.29 1,079,477.54 797,504.48 1,078,386.55 796,344.36 1,076,817.85 795,906.66 1,076,225.99 796,580.81 1,077,137.57 797,724.31 1,078,683.81 798,274.55 1,079,427.85 797,057.60 1,808,405.07
46 Beton K-400 (fc' 35 MPa) M3 828,436.25 872,619.52 827,598.98 871,737.60 826,395.10 870,469.50 825,940.88 869,991.06 826,640.46 870,727.95 827,827.11 871,977.89 828,398.11 872,579.35 827,135.25 1,629,442.58
47 Beton K-450 (fc' 40 MPa) M3 868,602.86 868,602.86 867,725.00 867,725.00 866,462.74 866,462.74 865,986.49 865,986.49 866,720.00 866,720.00 867,964.18 867,964.18 868,562.87 868,562.87 867,238.77 1,662,193.12
48 Beton K-500 (fc' 45 MPa) M3 903,748.64 903,748.64 902,835.25 902,835.25 901,521.92 901,521.92 901,026.41 901,026.41 901,789.59 901,789.59 903,084.12 903,084.12 903,707.03 903,707.03 902,329.36 1,729,449.49
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
51 Cat Anti Karat Kg 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
52 Cat Marka (Non Thermoplas) Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73 65,168.23 124,904.69
53 Cat Marka (Thermoplastic) Kg 44,584.93 44,584.93 44,539.87 44,539.87 44,475.08 44,475.08 44,450.64 44,450.64 44,488.29 44,488.29 44,552.15 44,552.15 44,582.88 44,582.88 44,514.92 85,319.51
54 Cerucuk Diameter 10-15 cm M' 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,310,435.52 1,310,435.52 1,309,111.12 1,309,111.12 1,307,206.79 1,307,206.79 1,306,488.30 1,306,488.30 1,307,594.91 1,307,594.91 1,309,471.98 1,309,471.98 1,310,375.20 1,310,375.20 1,308,377.57 2,507,701.76
57 Curing Compound Liter 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95 50,129.41 96,080.53
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 612,540.74 612,540.74 611,921.67 611,921.67 611,031.53 611,031.53 610,695.68 610,695.68 611,212.95 611,212.95 612,090.35 612,090.35 612,512.55 612,512.55 611,578.79 1,172,182.43
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 712,957.26 712,957.26 712,236.70 712,236.70 711,200.63 711,200.63 710,809.72 710,809.72 711,411.79 711,411.79 712,433.03 712,433.03 712,924.44 712,924.44 711,837.61 1,364,343.48
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 903,748.64 903,748.64 902,835.25 902,835.25 901,521.92 901,521.92 901,026.41 901,026.41 901,789.59 901,789.59 903,084.12 903,084.12 903,707.03 903,707.03 902,329.36 1,729,449.49
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 50,158.05 50,158.05 50,107.36 50,107.36 50,034.47 50,034.47 50,006.97 50,006.97 50,049.32 50,049.32 50,121.17 50,121.17 50,155.74 50,155.74 50,079.28 95,984.45
64 Oxygen (Isi 6 M3) Botol 172,716.41 172,716.41 172,541.85 172,541.85 172,290.86 172,290.86 172,196.16 172,196.16 172,342.01 172,342.01 172,589.41 172,589.41 172,708.46 172,708.46 172,445.17 330,517.01
65 Polytene 125 Mikron Kg 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21 27,069.88 51,883.48
66 Sand Sheet Ton 1,385,747.91 1,385,747.91 1,384,347.39 1,384,347.39 1,382,333.61 1,382,333.61 1,381,573.83 1,381,573.83 1,382,744.04 1,382,744.04 1,384,728.99 1,384,728.99 1,385,684.12 1,385,684.12 1,383,571.68 2,651,822.55
67 Seal Coat M2 110,458.17 110,458.17 110,346.53 110,346.53 110,186.01 110,186.01 110,125.45 110,125.45 110,218.73 110,218.73 110,376.95 110,376.95 110,453.08 110,453.08 110,284.70 211,377.16
68 Seal Guard Kg 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
69 Semen/PC (50 kg) Zak 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68 73,188.94 140,277.57
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 13,556.23 12,049.98 13,542.53 12,037.80 13,522.83 12,020.29 13,515.40 12,013.69 13,526.84 12,023.86 13,546.26 12,041.12 13,555.61 12,049.43 13,534.94 24,437.86
78 Baja Tulangan (Polos) U32 Kg 13,556.23 10,041.65 13,542.53 10,031.50 13,522.83 10,016.91 13,515.40 10,011.40 13,526.84 10,019.88 13,546.26 10,034.27 13,555.61 10,041.19 13,534.94 22,432.68
79 Baja Tulangan (Polos) U36 Kg 13,556.23 10,041.65 13,542.53 10,031.50 13,522.83 10,016.91 13,515.40 10,011.40 13,526.84 10,019.88 13,546.26 10,034.27 13,555.61 10,041.19 13,534.94 22,432.68
80 Baja Tulangan (Ulir) D16 Kg 13,556.23 10,123.99 13,542.53 10,113.76 13,522.83 10,099.05 13,515.40 10,093.50 13,526.84 10,102.05 13,546.26 10,116.55 13,555.61 10,123.53 13,534.94 22,514.90
81 Baja Tulangan (Ulir) D19 Kg 13,556.23 10,123.99 13,542.53 10,113.76 13,522.83 10,099.05 13,515.40 10,093.50 13,526.84 10,102.05 13,546.26 10,116.55 13,555.61 10,123.53 13,534.94 22,514.90
82 Baja Tulangan (Ulir) D24 Kg 13,556.23 10,123.99 13,542.53 10,113.76 13,522.83 10,099.05 13,515.40 10,093.50 13,526.84 10,102.05 13,546.26 10,116.55 13,555.61 10,123.53 13,534.94 22,514.90
83 Baja Tulangan (Ulir) D32 Kg 13,556.23 12,049.98 13,542.53 12,037.80 13,522.83 12,020.29 13,515.40 12,013.69 13,526.84 12,023.86 13,546.26 12,041.12 13,555.61 12,049.43 13,534.94 24,437.86
84 Baja Tulangan (Ulir) D36 Kg 13,556.23 11,045.82 13,542.53 11,034.65 13,522.83 11,018.60 13,515.40 11,012.55 13,526.84 11,021.87 13,546.26 11,037.69 13,555.61 11,045.31 13,534.94 23,435.27
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,054,146.96 13,054,146.96 13,040,953.68 13,040,953.68 13,021,983.32 13,021,983.32 13,014,825.93 13,014,825.93 13,025,849.65 13,025,849.65 13,044,548.44 13,044,548.44 13,053,546.05 13,053,546.05 13,033,646.29 24,980,937.04
87 Box Culvert Type DUB 200×200 M' 13,857,479.08 13,857,479.08 13,843,473.91 13,843,473.91 13,823,336.14 13,823,336.14 13,815,738.30 13,815,738.30 13,827,440.40 13,827,440.40 13,847,289.88 13,847,289.88 13,856,841.19 13,856,841.19 13,835,716.84 26,518,225.47
88 Box Culvert Type uk 300×200 M' 14,962,060.75 14,962,060.75 14,946,939.22 14,946,939.22 14,925,196.27 14,925,196.27 14,916,992.80 14,916,992.80 14,929,627.68 14,929,627.68 14,951,059.36 14,951,059.36 14,961,372.01 14,961,372.01 14,938,563.83 28,631,997.07
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 194,808.04 194,808.04 194,611.15 194,611.15 194,328.06 194,328.06 194,221.25 194,221.25 194,385.76 194,385.76 194,664.80 194,664.80 194,799.07 194,799.07 194,502.11 372,792.45
91 Ducting (Strand Prestress) M' 169,703.91 169,703.91 169,532.40 169,532.40 169,285.78 169,285.78 169,192.74 169,192.74 169,336.05 169,336.05 169,579.13 169,579.13 169,696.10 169,696.10 169,437.40 324,752.18
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,185,063.37 2,185,063.37 2,182,855.02 2,182,855.02 2,179,679.67 2,179,679.67 2,178,481.63 2,178,481.63 2,180,326.83 2,180,326.83 2,183,456.72 2,183,456.72 2,184,962.78 2,184,962.78 2,181,631.87 4,181,424.54
94 Expansion Join Tipe Rubber M' 1,581,560.11 1,581,560.11 1,579,961.70 1,579,961.70 1,577,663.36 1,577,663.36 1,576,796.22 1,576,796.22 1,578,131.78 1,578,131.78 1,580,397.21 1,580,397.21 1,581,487.31 1,581,487.31 1,579,076.38 3,026,536.60
95 Expansion Join Tipe Torma M' 1,814,526.43 1,814,526.43 1,812,692.56 1,812,692.56 1,810,055.68 1,810,055.68 1,809,060.80 1,809,060.80 1,810,593.10 1,810,593.10 1,813,192.23 1,813,192.23 1,814,442.90 1,814,442.90 1,811,676.83 3,472,350.25
96 Expansion Tipe Joint Asphaltic Plug M' 2,152,930.08 2,152,930.08 2,150,754.21 2,150,754.21 2,147,625.56 2,147,625.56 2,146,445.14 2,146,445.14 2,148,263.20 2,148,263.20 2,151,347.07 2,151,347.07 2,152,830.98 2,152,830.98 2,149,549.05 4,119,933.00
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
99 Glass Bead Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
100 Joint Sealent Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
101 Joint Socket Pile 16×16×16 Set 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
102 Joint Socket Pile 35×35 Set 785,257.15 785,257.15 784,463.52 784,463.52 783,322.38 783,322.38 782,891.84 782,891.84 783,554.96 783,554.96 784,679.76 784,679.76 785,221.00 785,221.00 784,023.95 1,502,699.44
103 Kawat Beton Kg 26,007.88 22,091.63 25,981.59 22,069.31 25,943.80 22,037.20 25,929.54 22,025.09 25,951.50 22,043.75 25,988.75 22,075.39 26,006.68 22,090.62 25,967.03 45,859.62
104 Kawat Bronjong Kg 31,129.12 34,141.62 31,097.66 34,107.11 31,052.42 34,057.49 31,035.35 34,038.78 31,061.64 34,067.61 31,106.23 34,116.51 31,127.69 34,140.04 31,080.23 62,577.69
105 Kawat Las Dos 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
106 Kayu Acuan (Kelas III/Meranti) M3 4,317,910.15 4,317,910.15 4,313,546.22 4,313,546.22 4,307,271.41 4,307,271.41 4,304,903.96 4,304,903.96 4,308,550.27 4,308,550.27 4,314,735.25 4,314,735.25 4,317,711.38 4,317,711.38 4,311,129.16 8,262,925.33
107 Kayu Perancah (Gelam) M3 2,781,537.47 5,250,154.98 2,778,726.28 5,244,848.87 2,774,684.14 5,237,219.32 2,773,159.06 5,234,340.74 2,775,507.96 5,238,774.29 2,779,492.24 5,246,294.62 2,781,409.43 5,249,913.31 2,777,169.25 7,787,601.92
108 Kerb Pracetak Type 1 (Peninggi) Buah 39,162.44 55,229.08 39,122.86 55,173.27 39,065.95 55,093.01 39,044.48 55,062.73 39,077.55 55,109.36 39,133.65 55,188.47 39,160.64 55,226.54 39,100.94 90,984.22
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 66,274.90 95,395.69 66,207.92 95,299.28 66,111.61 95,160.65 66,075.27 95,108.34 66,131.24 95,188.90 66,226.17 95,325.55 66,271.85 95,391.30 66,170.82 155,901.35
110 Marmer Nama Jembatan Buah 589,444.94 602,499.09 588,849.22 601,890.17 587,992.63 601,014.61 587,669.45 600,684.27 588,167.21 601,193.06 589,011.53 602,056.08 589,417.81 602,471.36 588,519.26 1,141,019.03
111 Mata Kucing Buah 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
112 Matras Concrete (Tebal=10 cm) M2 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48 147,380.46 282,476.75
113 Mini Pile 16×16×16 M' 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17 136,351.99 261,339.03
114 Mini Timber Pile Buah 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81 32,082.82 61,491.54
115 Multipleks 12 mm Lbr 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03 160,414.11 307,457.69
116 Paku Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
117 Paving Block (Model Bata 8 cm) M2 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30 95,245.88 182,553.00
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,754,890.90 66,754,890.90 66,687,424.53 66,687,424.53 66,590,415.94 66,590,415.94 66,553,815.25 66,553,815.25 66,610,187.15 66,610,187.15 66,705,806.99 66,705,806.99 66,751,818.01 66,751,818.01 66,650,056.79 127,744,825.57
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,570,265.57 94,570,265.57 94,474,687.38 94,474,687.38 94,337,257.33 94,337,257.33 94,285,405.89 94,285,405.89 94,365,266.79 94,365,266.79 94,500,729.43 94,500,729.43 94,565,912.28 94,565,912.28 94,421,749.28 180,973,437.56
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,749,727.14 180,749,727.14 180,567,050.99 180,567,050.99 180,304,384.45 180,304,384.45 180,205,282.12 180,205,282.12 180,357,918.22 180,357,918.22 180,616,824.49 180,616,824.49 180,741,406.80 180,741,406.80 180,465,871.76 345,889,897.44
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 237,025,150.53 237,025,150.53 236,785,599.17 236,785,599.17 236,441,152.86 236,441,152.86 236,311,195.57 236,311,195.57 236,511,354.07 236,511,354.07 236,850,869.37 236,850,869.37 237,014,239.69 237,014,239.69 236,652,918.35 453,580,795.40
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 302,144,256.39 302,144,256.39 301,838,891.89 301,838,891.89 301,399,814.12 301,399,814.12 301,234,153.01 301,234,153.01 301,489,302.07 301,489,302.07 301,922,094.09 301,922,094.09 302,130,347.97 302,130,347.97 301,669,759.00 578,195,317.40
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,536,049.71 364,536,049.71 364,167,628.44 364,167,628.44 363,637,882.56 363,637,882.56 363,438,012.98 363,438,012.98 363,745,849.47 363,745,849.47 364,268,011.63 364,268,011.63 364,519,269.24 364,519,269.24 363,963,570.17 697,590,745.16
124 Pelat Rambu (Eng. Grade) Buah 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97 210,543.52 403,538.21
125 Pelat Rambu (High L Grade) Buah 246,020.46 246,020.46 245,771.82 245,771.82 245,414.30 245,414.30 245,279.41 245,279.41 245,487.17 245,487.17 245,839.57 245,839.57 246,009.14 246,009.14 245,634.10 470,794.58
126 Pemantul Cahaya (Reflector) Buah 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
127 Pipa Baja D10" Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
128 Pipa Drainase Baja Dia 3" M' 276,145.42 276,145.42 275,866.33 275,866.33 275,465.03 275,465.03 275,313.63 275,313.63 275,546.82 275,546.82 275,942.37 275,942.37 276,132.70 276,132.70 275,711.75 528,442.90
129 Pipa Galvanis Dia 1,5" M' 109,454.00 109,454.00 109,343.38 109,343.38 109,184.32 109,184.32 109,124.31 109,124.31 109,216.74 109,216.74 109,373.52 109,373.52 109,448.96 109,448.96 109,282.11 209,455.55
130 Pipa Galvanis Dia 2" M' 141,587.29 316,312.02 141,444.19 315,992.34 141,238.43 315,532.67 141,160.80 315,359.24 141,280.37 315,626.36 141,483.18 316,079.44 141,580.77 316,297.46 141,364.93 445,397.43
131 Pipa Galvanis Dia 3" M' 242,003.80 242,003.80 241,759.22 241,759.22 241,407.54 241,407.54 241,274.85 241,274.85 241,479.21 241,479.21 241,825.86 241,825.86 241,992.66 241,992.66 241,623.75 463,108.14
132 Pipa Porus M' 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35 45,116.47 86,472.47
133 Pipa PVC Dia 4" M' 119,495.65 119,495.65 119,374.88 119,374.88 119,201.23 119,201.23 119,135.71 119,135.71 119,236.62 119,236.62 119,407.79 119,407.79 119,490.15 119,490.15 119,307.99 228,671.65
134 Plastik Filter M2 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
135 Rel Pengaman M' 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22 170,439.99 326,673.79
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,062,555.22 2,062,555.22 2,060,470.68 2,060,470.68 2,057,473.36 2,057,473.36 2,056,342.50 2,056,342.50 2,058,084.24 2,058,084.24 2,061,038.65 2,061,038.65 2,062,460.28 2,062,460.28 2,059,316.11 3,946,988.05
137 Strip Bearing Buah 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46 315,815.28 605,307.32
138 Tiang Pancang Baja Diameter 400 M' 731,032.23 731,032.23 730,293.41 730,293.41 729,231.07 729,231.07 728,830.25 728,830.25 729,447.58 729,447.58 730,494.71 730,494.71 730,998.58 730,998.58 729,884.19 1,398,932.47
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 892,702.82 892,702.82 891,800.60 891,800.60 890,503.32 890,503.32 890,013.87 890,013.87 890,767.72 890,767.72 892,046.43 892,046.43 892,661.73 892,661.73 891,300.89 1,708,311.77
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,867,747.18 1,867,747.18 1,865,859.53 1,865,859.53 1,863,145.31 1,863,145.31 1,862,121.25 1,862,121.25 1,863,698.49 1,863,698.49 1,866,373.85 1,866,373.85 1,867,661.20 1,867,661.20 1,864,814.01 3,574,195.61
HARGA SATUAN DASAR UPAH KABUPATEN BANGKALAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
2 Tukang OH 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
3 Mandor OH 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
4 Operator OH 311,000 311,000 311,841.46 311,841.46 312,271.36 312,271.36 312,280.05 312,280.05 311,867.61 311,867.61 311,422.13 311,422.13 311,354.72 311,354.72 311,720.23 311,720.23 312,173.57 312,173.57
5 Pembantu Operator OH 195,000 195,000 195,527.60 195,527.60 195,797.15 195,797.15 195,802.60 195,802.60 195,544.00 195,544.00 195,264.68 195,264.68 195,222.41 195,222.41 195,451.59 195,451.59 195,735.84 195,735.84
6 Sopir OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
7 Pembantu Sopir OH 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
8 Mekanik OH 175,000 175,000 175,473.49 175,473.49 175,715.40 175,715.40 175,720.29 175,720.29 175,488.20 175,488.20 175,237.53 175,237.53 175,199.60 175,199.60 175,405.27 175,405.27 175,660.37 175,660.37
9 Pembantu Mekanik OH 126,000 126,000 126,340.91 126,340.91 126,515.08 126,515.08 126,518.61 126,518.61 126,351.51 126,351.51 126,171.02 126,171.02 126,143.71 126,143.71 126,291.80 126,291.80 126,475.47 126,475.47
10 Kepala Tukang OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94
11 Pemasak Aspal OH 146,000 146,000 146,395.03 146,395.03 146,596.84 146,596.84 146,600.92 146,600.92 146,407.30 146,407.30 146,198.17 146,198.17 146,166.52 146,166.52 146,338.11 146,338.11 146,550.94 146,550.94

HARGA SATUAN DASAR ALAT KABUPATEN BANGKALAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 458,127 512,000 459,366.46 513,385.29 459,999.74 514,093.04 460,012.55 514,107.35 459,404.99 513,428.35 458,748.77 512,694.96 458,649.46 512,583.97 459,187.88 513,185.71 459,855.70 513,932.06
2 Asphalt Distribution Unit/Jam 282,074 363,000 282,837.10 363,982.15 283,227.02 364,483.93 283,234.90 364,494.08 282,860.82 364,012.68 282,456.78 363,492.71 282,395.63 363,414.03 282,727.15 363,840.65 283,138.33 364,369.80
3 Asphalt Finisher Unit/Jam 207,178 982,000 207,738.97 984,656.95 208,025.36 986,014.39 208,031.15 986,041.84 207,756.40 984,739.52 207,459.63 983,332.91 207,414.72 983,120.04 207,658.21 984,274.15 207,960.22 985,705.62
4 Asphalt Liquid Mixer Unit/Jam 73,923 135,000 74,122.83 135,365.26 74,225.01 135,551.88 74,227.08 135,555.65 74,129.04 135,376.61 74,023.16 135,183.24 74,007.13 135,153.98 74,094.01 135,312.64 74,201.77 135,509.43
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 99,212 99,212 99,480.64 99,480.64 99,617.78 99,617.78 99,620.55 99,620.55 99,488.98 99,488.98 99,346.87 99,346.87 99,325.36 99,325.36 99,441.96 99,441.96 99,586.58 99,586.58
6 Asphalt Mixing Plant Unit/Jam 1,108,842 5,687,776 1,111,842.40 5,703,165.35 1,113,375.17 5,711,027.67 1,113,406.17 5,711,186.65 1,111,935.64 5,703,643.61 1,110,347.33 5,695,496.45 1,110,106.97 5,694,263.52 1,111,410.16 5,700,948.18 1,113,026.52 5,709,239.29
7 Asphalt Sprayer Unit/Jam 91,431 91,431 91,678.23 91,678.23 91,804.62 91,804.62 91,807.18 91,807.18 91,685.92 91,685.92 91,554.96 91,554.96 91,535.14 91,535.14 91,642.59 91,642.59 91,775.87 91,775.87
8 Asphalt Tanker Unit/Jam 427,974 496,000 429,132.15 497,342.00 429,723.75 498,027.63 429,735.71 498,041.50 429,168.14 497,383.71 428,555.11 496,673.24 428,462.34 496,565.72 428,965.32 497,148.66 429,589.18 497,871.68
9 Blending Equipment Unit/Jam 139,092 220,000 139,467.95 220,595.24 139,660.22 220,899.35 139,664.11 220,905.50 139,479.65 220,613.74 139,280.41 220,298.61 139,250.26 220,250.93 139,413.73 220,509.48 139,616.49 220,830.18
10 Bore Pile Machine Unit/Jam 383,231 666,000 384,268.34 667,801.97 384,798.09 668,722.59 384,808.80 668,741.20 384,300.56 667,857.97 383,751.62 666,903.99 383,668.55 666,759.62 384,118.95 667,542.35 384,677.59 668,513.18
11 Bore Pile Machine Dia 60 Unit/Jam 250,949 759,000 251,627.49 761,053.59 251,974.38 762,102.77 251,981.40 762,123.99 251,648.59 761,117.41 251,289.13 760,030.22 251,234.74 759,865.69 251,529.67 760,757.72 251,895.48 761,864.12
12 Bore Pile Machine Dia 80 Unit/Jam 992,122 992,122 994,806.36 994,806.36 996,177.79 996,177.79 996,205.52 996,205.52 994,889.78 994,889.78 993,468.67 993,468.67 993,253.61 993,253.61 994,419.61 994,419.61 995,865.84 995,865.84
13 Bulldozer 100-150 HP Unit/Jam 389,067 564,000 390,120.14 565,525.99 390,657.96 566,305.62 390,668.83 566,321.38 390,152.85 565,573.41 389,595.56 564,765.54 389,511.22 564,643.28 389,968.48 565,306.13 390,535.62 566,128.28
14 Cement Tanker Unit/Jam 361,833 467,000 362,811.73 468,263.54 363,311.90 468,909.08 363,322.01 468,922.14 362,842.16 468,302.81 362,323.87 467,633.88 362,245.43 467,532.65 362,670.68 468,081.50 363,198.13 468,762.25
15 Cold Milling Unit/Jam 565,120 1,202,000 566,649.50 1,205,252.20 567,430.68 1,206,913.74 567,446.48 1,206,947.34 566,697.02 1,205,353.27 565,887.54 1,203,631.52 565,765.04 1,203,370.97 566,429.21 1,204,783.64 567,252.99 1,206,535.80
16 Cold Recycler Unit/Jam 4,759,268 4,759,268 4,772,144.61 4,772,144.61 4,778,723.44 4,778,723.44 4,778,856.46 4,778,856.46 4,772,544.80 4,772,544.80 4,765,727.63 4,765,727.63 4,764,695.97 4,764,695.97 4,770,289.38 4,770,289.38 4,777,227.00 4,777,227.00
17 Compressor 4000-6500 L\M Unit/Jam 144,928 144,928 145,319.75 145,319.75 145,520.09 145,520.09 145,524.14 145,524.14 145,331.94 145,331.94 145,124.34 145,124.34 145,092.93 145,092.93 145,263.26 145,263.26 145,474.52 145,474.52
18 Concrete Breaker Unit/Jam 528,159 1,007,000 529,588.09 1,009,724.59 530,318.17 1,011,116.59 530,332.94 1,011,144.73 529,632.50 1,009,809.27 528,875.97 1,008,366.84 528,761.48 1,008,148.56 529,382.21 1,009,332.05 530,152.11 1,010,799.96
19 Concrete Mixer (350) Unit/Jam 98,240 98,240 98,505.34 98,505.34 98,641.13 98,641.13 98,643.88 98,643.88 98,513.60 98,513.60 98,372.88 98,372.88 98,351.58 98,351.58 98,467.04 98,467.04 98,610.24 98,610.24
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 111,857 111,857 112,159.54 112,159.54 112,314.16 112,314.16 112,317.29 112,317.29 112,168.95 112,168.95 112,008.72 112,008.72 111,984.48 111,984.48 112,115.94 112,115.94 112,278.99 112,278.99
21 Concrete Pan Mixer Unit/Jam 297,637 637,000 298,441.91 638,723.50 298,853.34 639,604.04 298,861.65 639,621.84 298,466.93 638,777.06 298,040.60 637,864.63 297,976.08 637,726.54 298,325.88 638,475.19 298,759.75 639,403.75
22 Concrete Pump Unit/Jam 226,632 243,000 227,244.98 243,657.47 227,558.26 243,993.38 227,564.59 244,000.17 227,264.04 243,677.91 226,939.41 243,329.83 226,890.28 243,277.16 227,156.64 243,562.75 227,487.00 243,916.97
23 Concrete Vibrator Unit/Jam 84,622 84,622 84,851.13 84,851.13 84,968.11 84,968.11 84,970.47 84,970.47 84,858.25 84,858.25 84,737.03 84,737.03 84,718.69 84,718.69 84,818.14 84,818.14 84,941.50 84,941.50
24 Crane 10-15 Ton Unit/Jam 303,473 303,473 304,293.71 304,293.71 304,713.20 304,713.20 304,721.69 304,721.69 304,319.23 304,319.23 303,884.53 303,884.53 303,818.75 303,818.75 304,175.41 304,175.41 304,617.79 304,617.79
25 Crane On Track 35 Ton Unit/Jam 251,921 479,000 252,602.79 480,296.01 252,951.03 480,958.14 252,958.07 480,971.53 252,623.97 480,336.28 252,263.12 479,650.17 252,208.51 479,546.33 252,504.59 480,109.29 252,871.82 480,807.53
26 Crane On Track 75-100 Ton Unit/Jam 395,876 600,000 396,947.24 601,623.39 397,494.47 602,452.78 397,505.53 602,469.55 396,980.53 601,673.84 396,413.48 600,814.40 396,327.66 600,684.34 396,792.92 601,389.50 397,370.00 602,264.13
27 Dump Truck 10 Ton Unit/Jam 374,477 403,000 375,490.63 404,090.38 376,008.28 404,647.45 376,018.75 404,658.72 375,522.12 404,124.26 374,985.72 403,547.01 374,904.55 403,459.65 375,344.66 403,933.28 375,890.54 404,520.74
28 Dump Truck 3-4 M3 Unit/Jam 204,260 267,000 204,813.07 267,722.41 205,095.43 268,091.49 205,101.14 268,098.95 204,830.25 267,744.86 204,537.67 267,362.41 204,493.39 267,304.53 204,733.45 267,618.33 205,031.20 268,007.54
29 Excavator 80-140 HP Unit/Jam 295,691 470,000 296,491.31 471,271.66 296,900.05 471,921.35 296,908.31 471,934.48 296,516.17 471,311.18 296,092.62 470,637.95 296,028.53 470,536.07 296,376.04 471,088.44 296,807.07 471,773.57
30 Flat Bed Truck 3-4 M3 Unit/Jam 358,915 480,000 359,885.83 481,298.71 360,381.96 481,962.23 360,392.00 481,975.64 359,916.01 481,339.07 359,401.90 480,651.52 359,324.10 480,547.47 359,745.92 481,111.60 360,269.11 481,811.30
31 Fulvi Mixer Unit/Jam 898,746 1,404,000 901,177.52 1,407,798.74 902,419.88 1,409,739.51 902,445.00 1,409,778.76 901,253.09 1,407,916.79 899,965.73 1,405,905.71 899,770.91 1,405,601.36 900,827.18 1,407,251.44 902,137.29 1,409,298.06
32 Generator Set Unit/Jam 399,767 424,000 400,848.44 425,147.20 401,401.05 425,733.30 401,412.22 425,745.15 400,882.06 425,182.85 400,309.43 424,575.51 400,222.78 424,483.60 400,692.61 424,981.92 401,275.35 425,599.98
33 Hot Recycler Unit/Jam 2,936,487 8,611,000 2,944,431.76 8,634,298.38 2,948,490.92 8,646,201.52 2,948,572.99 8,646,442.21 2,944,678.67 8,635,022.44 2,940,472.45 8,622,688.06 2,939,835.92 8,620,821.47 2,943,287.07 8,630,941.69 2,947,567.61 8,643,494.01
34 Jack Hammer Unit/Jam 55,442 55,442 55,592.12 55,592.12 55,668.76 55,668.76 55,670.31 55,670.31 55,596.78 55,596.78 55,517.37 55,517.37 55,505.35 55,505.35 55,570.51 55,570.51 55,651.33 55,651.33
35 Launching Gantry Unit/Jam 70,556,411 70,556,411 70,747,312.08 70,747,312.08 70,844,843.51 70,844,843.51 70,846,815.65 70,846,815.65 70,753,244.84 70,753,244.84 70,652,179.98 70,652,179.98 70,636,885.59 70,636,885.59 70,719,808.21 70,719,808.21 70,822,658.84 70,822,658.84
36 Motor Grader > 100 HP Unit/Jam 277,211 466,000 277,960.60 467,260.83 278,343.79 467,904.99 278,351.54 467,918.02 277,983.91 467,300.02 277,586.83 466,632.52 277,526.74 466,531.51 277,852.54 467,079.18 278,256.63 467,758.47
37 Pedestrian Roller Unit/Jam 91,431 91,431 91,678.23 91,678.23 91,804.62 91,804.62 91,807.18 91,807.18 91,685.92 91,685.92 91,554.96 91,554.96 91,535.14 91,535.14 91,642.59 91,642.59 91,775.87 91,775.87
38 Pile Driver + Hammer Unit/Jam 104,076 304,000 104,357.14 304,822.52 104,501.00 305,242.74 104,503.91 305,251.24 104,365.89 304,848.08 104,216.81 304,412.63 104,194.25 304,346.73 104,316.57 304,704.02 104,468.28 305,147.16
39 Rock Drill Breaker Unit/Jam 101,158 329,000 101,431.24 329,890.16 101,571.07 330,344.94 101,573.90 330,354.14 101,439.74 329,917.82 101,294.84 329,446.57 101,272.92 329,375.25 101,391.80 329,761.91 101,539.26 330,241.50
40 Split Form Paver Unit/Jam 213,987 213,987 214,566.08 214,566.08 214,861.88 214,861.88 214,867.86 214,867.86 214,584.07 214,584.07 214,277.56 214,277.56 214,231.17 214,231.17 214,482.66 214,482.66 214,794.59 214,794.59
41 Stone Crusher Unit/Jam 572,902 714,000 574,451.91 715,931.84 575,243.84 716,918.81 575,259.85 716,938.77 574,500.08 715,991.87 573,679.46 714,969.14 573,555.27 714,814.37 574,228.58 715,653.51 575,063.70 716,694.31
42 Tamper Unit/Jam 85,595 85,595 85,826.43 85,826.43 85,944.75 85,944.75 85,947.14 85,947.14 85,833.63 85,833.63 85,711.02 85,711.02 85,692.47 85,692.47 85,793.06 85,793.06 85,917.84 85,917.84
43 Tandem Roller 6-8 T Unit/Jam 413,384 482,000 414,502.65 483,304.12 415,074.08 483,970.40 415,085.63 483,983.87 414,537.41 483,344.65 413,945.28 482,654.24 413,855.67 482,549.76 414,341.51 483,116.23 414,944.10 483,818.85
44 Three Wheel Roller 6-8 T Unit/Jam 137,146 173,000 137,517.35 173,468.08 137,706.93 173,707.22 137,710.76 173,712.05 137,528.88 173,482.62 137,332.43 173,234.82 137,302.70 173,197.32 137,463.89 173,400.64 137,663.81 173,652.82
45 Tire Roller 8-10 T Unit/Jam 245,112 443,000 245,775.69 444,198.60 246,114.51 444,810.97 246,121.36 444,823.35 245,796.30 444,235.85 245,445.20 443,601.30 245,392.07 443,505.27 245,680.14 444,025.92 246,037.44 444,671.68
46 Track Loader 75-100 HP Unit/Jam 229,550 302,000 230,170.88 302,817.11 230,488.19 303,234.57 230,494.61 303,243.01 230,190.18 302,842.50 229,861.38 302,409.92 229,811.62 302,344.45 230,081.40 302,699.38 230,416.02 303,139.61
47 Trailer 20 Ton Unit/Jam 370,587 513,000 371,589.43 514,388.00 372,101.70 515,097.13 372,112.06 515,111.47 371,620.59 514,431.14 371,089.77 513,696.32 371,009.44 513,585.11 371,444.97 514,188.03 371,985.18 514,935.83
48 Trailler 15 Ton Unit/Jam 320,981 488,000 321,849.12 489,320.36 322,292.81 489,994.93 322,301.78 490,008.57 321,876.11 489,361.39 321,416.33 488,662.38 321,346.75 488,556.60 321,723.99 489,130.13 322,191.89 489,841.49
49 Truck Mixer (agitator) Unit/Jam 403,657 593,000 404,749.65 594,604.45 405,307.63 595,424.17 405,318.91 595,440.74 404,783.59 594,654.32 404,205.39 593,804.90 404,117.89 593,676.36 404,592.29 594,373.29 405,180.71 595,237.71
50 Vibrating Rammer Unit/Jam 82,677 82,677 82,900.53 82,900.53 83,014.82 83,014.82 83,017.13 83,017.13 82,907.48 82,907.48 82,789.06 82,789.06 82,771.13 82,771.13 82,868.30 82,868.30 82,988.82 82,988.82
51 Vibratory Roller 5-8 T Unit/Jam 199,397 428,000 199,936.57 429,158.02 200,212.20 429,749.65 200,217.78 429,761.62 199,953.34 429,194.01 199,667.72 428,580.94 199,624.50 428,488.17 199,858.84 428,991.18 200,149.51 429,615.08
52 Water Pump 70-100 MM Unit/Jam 62,251 62,251 62,419.22 62,419.22 62,505.27 62,505.27 62,507.01 62,507.01 62,424.46 62,424.46 62,335.29 62,335.29 62,321.79 62,321.79 62,394.96 62,394.96 62,485.70 62,485.70
53 Water Tanker 3000-4500 L Unit/Jam 225,659 225,659 226,269.68 226,269.68 226,581.61 226,581.61 226,587.92 226,587.92 226,288.66 226,288.66 225,965.42 225,965.42 225,916.51 225,916.51 226,181.72 226,181.72 226,510.66 226,510.66
54 Welding Set Unit/Jam 126,447 126,447 126,789.05 126,789.05 126,963.84 126,963.84 126,967.37 126,967.37 126,799.68 126,799.68 126,618.56 126,618.56 126,591.15 126,591.15 126,739.75 126,739.75 126,924.08 126,924.08
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 219,823 350,000 220,417.88 350,946.98 220,721.74 351,430.79 220,727.89 351,440.57 220,436.36 350,976.41 220,121.49 350,475.07 220,073.84 350,399.20 220,332.19 350,810.54 220,652.63 351,320.74
HARGA SATUAN DASAR BAHAN KABUPATEN BANGKALAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 306,000 306,000 306,827.93 306,827.93 307,250.92 307,250.92 307,259.47 307,259.47 306,853.66 306,853.66 306,415.35 306,415.35 306,349.02 306,349.02 306,708.65 306,708.65 307,154.71 307,154.71
2 Agregat Pecah Mesin 20-30 mm M3 292,000 292,000 292,790.05 292,790.05 293,193.69 293,193.69 293,201.85 293,201.85 292,814.60 292,814.60 292,396.34 292,396.34 292,333.05 292,333.05 292,676.23 292,676.23 293,101.88 293,101.88
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 335,000 335,000 335,906.39 335,906.39 336,369.47 336,369.47 336,378.83 336,378.83 335,934.56 335,934.56 335,454.71 335,454.71 335,382.09 335,382.09 335,775.81 335,775.81 336,264.14 336,264.14
4 Bahan Agr. Base Kelas A M3 321,000 321,000 321,868.51 321,868.51 322,312.24 322,312.24 322,321.21 322,321.21 321,895.51 321,895.51 321,435.71 321,435.71 321,366.12 321,366.12 321,743.38 321,743.38 322,211.31 322,211.31
5 Bahan Agr. Base Kelas B M3 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
6 Bahan Agr. Base Kelas C M3 277,000 277,000 277,749.47 277,749.47 278,132.37 278,132.37 278,140.11 278,140.11 277,772.76 277,772.76 277,375.98 277,375.98 277,315.94 277,315.94 277,641.49 277,641.49 278,045.27 278,045.27
7 Bahan Agr. Base Kelas C2 M3 253,000 253,000 253,684.53 253,684.53 254,034.26 254,034.26 254,041.33 254,041.33 253,705.80 253,705.80 253,343.41 253,343.41 253,288.56 253,288.56 253,585.91 253,585.91 253,954.71 253,954.71
8 Bahan Agr. Base Kelas S M3 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82 205,474.75 205,474.75 205,773.58 205,773.58
9 Bahan Pilihan M3 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68 204,472.43 204,472.43 204,769.80 204,769.80
10 Bahan Tanah Timbunan M3 117,000 117,000 117,316.56 117,316.56 117,478.29 117,478.29 117,481.56 117,481.56 117,326.40 117,326.40 117,158.81 117,158.81 117,133.45 117,133.45 117,270.95 117,270.95 117,441.51 117,441.51
11 Batu Belah/Kerakal M3 330,000 330,000 330,892.87 330,892.87 331,349.03 331,349.03 331,358.25 331,358.25 330,920.61 330,920.61 330,447.92 330,447.92 330,376.39 330,376.39 330,764.23 330,764.23 331,245.27 331,245.27
12 Batu Kali M3 340,434 340,434 341,355.10 341,355.10 341,825.68 341,825.68 341,835.20 341,835.20 341,383.72 341,383.72 340,896.08 340,896.08 340,822.29 340,822.29 341,222.39 341,222.39 341,718.64 341,718.64
13 Chipping M3 217,000 217,000 217,587.13 217,587.13 217,887.09 217,887.09 217,893.16 217,893.16 217,605.37 217,605.37 217,294.54 217,294.54 217,247.50 217,247.50 217,502.54 217,502.54 217,818.86 217,818.86
14 Chipping (kg) Kg 263 263 263.71 263.71 264.08 264.08 264.08 264.08 263.73 263.73 263.36 263.36 263.30 263.30 263.61 263.61 263.99 263.99
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 388,000 388,000 389,049.79 389,049.79 389,586.13 389,586.13 389,596.98 389,596.98 389,082.42 389,082.42 388,526.65 388,526.65 388,442.54 388,442.54 388,898.55 388,898.55 389,464.14 389,464.14
18 Kapur M3 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
19 Pasir Beton (Kasar) M3 462,000 462,000 463,250.01 463,250.01 463,888.64 463,888.64 463,901.56 463,901.56 463,288.86 463,288.86 462,627.09 462,627.09 462,526.94 462,526.94 463,069.92 463,069.92 463,743.38 463,743.38
20 Pasir Halus (untuk HRS) M3 292,000 292,000 292,790.05 292,790.05 293,193.69 293,193.69 293,201.85 293,201.85 292,814.60 292,814.60 292,396.34 292,396.34 292,333.05 292,333.05 292,676.23 292,676.23 293,101.88 293,101.88
21 Pasir Pasang (Sedang) M3 327,000 327,000 327,884.75 327,884.75 328,336.77 328,336.77 328,345.91 328,345.91 327,912.24 327,912.24 327,443.85 327,443.85 327,372.97 327,372.97 327,757.28 327,757.28 328,233.95 328,233.95
22 Pasir Urug M3 198,000 198,000 198,535.72 198,535.72 198,809.42 198,809.42 198,814.95 198,814.95 198,552.37 198,552.37 198,268.75 198,268.75 198,225.83 198,225.83 198,458.54 198,458.54 198,747.16 198,747.16
23 Pasir Urug (ada unsur lempung) M3 350,000 350,000 350,946.98 350,946.98 351,430.79 351,430.79 351,440.57 351,440.57 350,976.41 350,976.41 350,475.07 350,475.07 350,399.20 350,399.20 350,810.54 350,810.54 351,320.74 351,320.74
24 Sirtu M3 151,000 151,000 151,408.55 151,408.55 151,617.28 151,617.28 151,621.50 151,621.50 151,421.25 151,421.25 151,204.96 151,204.96 151,172.23 151,172.23 151,349.69 151,349.69 151,569.81 151,569.81
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
26 Anti Pengelupas Liter 98,000 98,000 98,265.15 98,265.15 98,400.62 98,400.62 98,403.36 98,403.36 98,273.39 98,273.39 98,133.02 98,133.02 98,111.78 98,111.78 98,226.95 98,226.95 98,369.81 98,369.81
27 Arbocell Kg 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
28 Asbuton Curah Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
40 Beton B-0 M3 573,875 573,875 575,427.21 575,427.21 576,220.48 576,220.48 576,236.52 576,236.52 575,475.46 575,475.46 574,653.44 574,653.44 574,529.05 574,529.05 575,203.50 575,203.50 576,040.04 576,040.04
41 Beton K-125 (fc' 10 MPa) M3 593,328 593,328 594,933.21 594,933.21 595,753.38 595,753.38 595,769.97 595,769.97 594,983.10 594,983.10 594,133.22 594,133.22 594,004.61 594,004.61 594,701.93 594,701.93 595,566.82 595,566.82
42 Beton K-175 (fc' 15 MPa) M3 641,961 641,961 643,698.23 643,698.23 644,585.63 644,585.63 644,603.57 644,603.57 643,752.21 643,752.21 642,832.67 642,832.67 642,693.51 642,693.51 643,447.99 643,447.99 644,383.78 644,383.78
43 Beton K-250 (fc' 20 MPa) M3 714,911 714,911 716,845.76 716,845.76 717,833.99 717,833.99 717,853.98 717,853.98 716,905.87 716,905.87 715,881.83 715,881.83 715,726.86 715,726.86 716,567.07 716,567.07 717,609.21 717,609.21
44 Beton K-300 (fc' 25 MPa) M3 744,092 744,092 746,104.77 746,104.77 747,133.34 747,133.34 747,154.14 747,154.14 746,167.33 746,167.33 745,101.50 745,101.50 744,940.20 744,940.20 745,814.71 745,814.71 746,899.38 746,899.38
45 Beton K-350 (fc' 30 MPa) M3 773,272 773,272 775,363.78 775,363.78 776,432.69 776,432.69 776,454.30 776,454.30 775,428.80 775,428.80 774,321.17 774,321.17 774,153.55 774,153.55 775,062.35 775,062.35 776,189.55 776,189.55
46 Beton K-400 (fc' 35 MPa) M3 802,452 802,452 804,622.79 804,622.79 805,732.03 805,732.03 805,754.46 805,754.46 804,690.26 804,690.26 803,540.83 803,540.83 803,366.89 803,366.89 804,309.98 804,309.98 805,479.72 805,479.72
47 Beton K-450 (fc' 40 MPa) M3 841,358 841,358 843,634.80 843,634.80 844,797.83 844,797.83 844,821.34 844,821.34 843,705.55 843,705.55 842,500.39 842,500.39 842,318.01 842,318.01 843,306.83 843,306.83 844,533.28 844,533.28
48 Beton K-500 (fc' 45 MPa) M3 875,402 875,402 877,770.31 877,770.31 878,980.40 878,980.40 879,004.87 879,004.87 877,843.92 877,843.92 876,590.00 876,590.00 876,400.24 876,400.24 877,429.07 877,429.07 878,705.15 878,705.15
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 76,000 76,000 76,205.63 76,205.63 76,310.69 76,310.69 76,312.81 76,312.81 76,212.02 76,212.02 76,103.16 76,103.16 76,086.68 76,086.68 76,176.00 76,176.00 76,286.79 76,286.79
51 Cat Anti Karat Kg 71,000 71,000 71,192.10 71,192.10 71,290.25 71,290.25 71,292.23 71,292.23 71,198.07 71,198.07 71,096.37 71,096.37 71,080.98 71,080.98 71,164.42 71,164.42 71,267.92 71,267.92
52 Cat Marka (Non Thermoplas) Kg 63,223 63,223 63,394.52 63,394.52 63,481.92 63,481.92 63,483.68 63,483.68 63,399.84 63,399.84 63,309.28 63,309.28 63,295.57 63,295.57 63,369.88 63,369.88 63,462.04 63,462.04
53 Cat Marka (Thermoplastic) Kg 43,186 43,186 43,303.34 43,303.34 43,363.03 43,363.03 43,364.24 43,364.24 43,306.97 43,306.97 43,245.11 43,245.11 43,235.75 43,235.75 43,286.50 43,286.50 43,349.45 43,349.45
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,269,000 1,269,000 1,272,433.47 1,272,433.47 1,274,187.64 1,274,187.64 1,274,223.11 1,274,223.11 1,272,540.18 1,272,540.18 1,270,722.47 1,270,722.47 1,270,447.39 1,270,447.39 1,271,938.80 1,271,938.80 1,273,788.63 1,273,788.63
57 Curing Compound Liter 49,000 49,000 49,132.58 49,132.58 49,200.31 49,200.31 49,201.68 49,201.68 49,136.70 49,136.70 49,066.51 49,066.51 49,055.89 49,055.89 49,113.48 49,113.48 49,184.90 49,184.90
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 593,000 593,000 594,604.45 594,604.45 595,424.17 595,424.17 595,440.74 595,440.74 594,654.32 594,654.32 593,804.90 593,804.90 593,676.36 593,676.36 594,373.29 594,373.29 595,237.71 595,237.71
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 691,000 691,000 692,869.61 692,869.61 693,824.79 693,824.79 693,844.10 693,844.10 692,927.71 692,927.71 691,937.92 691,937.92 691,788.14 691,788.14 692,600.25 692,600.25 693,607.52 693,607.52
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 875,000 875,000 877,367.45 877,367.45 878,576.98 878,576.98 878,601.43 878,601.43 877,441.02 877,441.02 876,187.67 876,187.67 875,998.00 875,998.00 877,026.36 877,026.36 878,301.85 878,301.85
61 Kerosen/Minyak Tanah Liter 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
64 Oxygen (Isi 6 M3) Botol 167,000 167,000 167,451.84 167,451.84 167,682.69 167,682.69 167,687.36 167,687.36 167,465.89 167,465.89 167,226.68 167,226.68 167,190.48 167,190.48 167,386.75 167,386.75 167,630.18 167,630.18
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,342,000 1,342,000 1,345,630.99 1,345,630.99 1,347,486.06 1,347,486.06 1,347,523.57 1,347,523.57 1,345,743.83 1,345,743.83 1,343,821.55 1,343,821.55 1,343,530.65 1,343,530.65 1,345,107.86 1,345,107.86 1,347,064.10 1,347,064.10
67 Seal Coat M2 107,000 107,000 107,289.50 107,289.50 107,437.41 107,437.41 107,440.40 107,440.40 107,298.50 107,298.50 107,145.24 107,145.24 107,122.04 107,122.04 107,247.79 107,247.79 107,403.77 107,403.77
68 Seal Guard Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
69 Semen/PC (50 kg) Zak 71,000 71,000 71,192.10 71,192.10 71,290.25 71,290.25 71,292.23 71,292.23 71,198.07 71,198.07 71,096.37 71,096.37 71,080.98 71,080.98 71,164.42 71,164.42 71,267.92 71,267.92
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 39,000 39,000 39,105.52 39,105.52 39,159.43 39,159.43 39,160.52 39,160.52 39,108.80 39,108.80 39,052.94 39,052.94 39,044.48 39,044.48 39,090.32 39,090.32 39,147.17 39,147.17
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
78 Baja Tulangan (Polos) U32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
81 Baja Tulangan (Ulir) D19 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
84 Baja Tulangan (Ulir) D36 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,645,000 12,645,000 12,679,212.99 12,679,212.99 12,696,692.40 12,696,692.40 12,697,045.85 12,697,045.85 12,680,276.25 12,680,276.25 12,662,163.57 12,662,163.57 12,659,422.54 12,659,422.54 12,674,283.79 12,674,283.79 12,692,716.50 12,692,716.50
87 Box Culvert Type DUB 200×200 M' 13,423,000 13,423,000 13,459,317.98 13,459,317.98 13,477,872.84 13,477,872.84 13,478,248.04 13,478,248.04 13,460,446.66 13,460,446.66 13,441,219.58 13,441,219.58 13,438,309.90 13,438,309.90 13,454,085.51 13,454,085.51 13,473,652.32 13,473,652.32
88 Box Culvert Type uk 300×200 M' 14,493,000 14,493,000 14,532,213.03 14,532,213.03 14,552,246.97 14,552,246.97 14,552,652.07 14,552,652.07 14,533,431.68 14,533,431.68 14,512,671.94 14,512,671.94 14,509,530.32 14,509,530.32 14,526,563.46 14,526,563.46 14,547,690.02 14,547,690.02
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 189,000 189,000 189,511.37 189,511.37 189,772.63 189,772.63 189,777.91 189,777.91 189,527.26 189,527.26 189,256.54 189,256.54 189,215.57 189,215.57 189,437.69 189,437.69 189,713.20 189,713.20
91 Ducting (Strand Prestress) M' 164,000 164,000 164,443.73 164,443.73 164,670.43 164,670.43 164,675.01 164,675.01 164,457.52 164,457.52 164,222.60 164,222.60 164,187.05 164,187.05 164,379.80 164,379.80 164,618.86 164,618.86
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,117,000 2,117,000 2,122,727.87 2,122,727.87 2,125,654.24 2,125,654.24 2,125,713.41 2,125,713.41 2,122,905.88 2,122,905.88 2,119,873.49 2,119,873.49 2,119,414.59 2,119,414.59 2,121,902.63 2,121,902.63 2,124,988.60 2,124,988.60
94 Expansion Join Tipe Rubber M' 1,532,000 1,532,000 1,536,145.06 1,536,145.06 1,538,262.77 1,538,262.77 1,538,305.59 1,538,305.59 1,536,273.88 1,536,273.88 1,534,079.45 1,534,079.45 1,533,747.36 1,533,747.36 1,535,547.87 1,535,547.87 1,537,781.07 1,537,781.07
95 Expansion Join Tipe Torma M' 1,758,000 1,758,000 1,762,756.54 1,762,756.54 1,765,186.65 1,765,186.65 1,765,235.79 1,765,235.79 1,762,904.36 1,762,904.36 1,760,386.20 1,760,386.20 1,760,005.13 1,760,005.13 1,762,071.25 1,762,071.25 1,764,633.90 1,764,633.90
96 Expansion Tipe Joint Asphaltic Plug M' 2,085,000 2,085,000 2,090,641.29 2,090,641.29 2,093,523.42 2,093,523.42 2,093,581.70 2,093,581.70 2,090,816.61 2,090,816.61 2,087,830.06 2,087,830.06 2,087,378.09 2,087,378.09 2,089,828.53 2,089,828.53 2,092,867.85 2,092,867.85
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,000 41,000 41,110.93 41,110.93 41,167.61 41,167.61 41,168.75 41,168.75 41,114.38 41,114.38 41,055.65 41,055.65 41,046.76 41,046.76 41,094.95 41,094.95 41,154.72 41,154.72
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
99 Glass Bead Kg 68,000 68,000 68,183.98 68,183.98 68,277.98 68,277.98 68,279.88 68,279.88 68,189.70 68,189.70 68,092.30 68,092.30 68,077.56 68,077.56 68,157.48 68,157.48 68,256.60 68,256.60
100 Joint Sealent Kg 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
101 Joint Socket Pile 16×16×16 Set 89,000 89,000 89,240.80 89,240.80 89,363.83 89,363.83 89,366.32 89,366.32 89,248.29 89,248.29 89,120.80 89,120.80 89,101.51 89,101.51 89,206.11 89,206.11 89,335.85 89,335.85
102 Joint Socket Pile 35×35 Set 761,000 761,000 763,059.00 763,059.00 764,110.95 764,110.95 764,132.22 764,132.22 763,122.99 763,122.99 762,032.94 762,032.94 761,867.98 761,867.98 762,762.35 762,762.35 763,871.67 763,871.67
103 Kawat Beton Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
104 Kawat Bronjong Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
105 Kawat Las Dos 175,000 175,000 175,473.49 175,473.49 175,715.40 175,715.40 175,720.29 175,720.29 175,488.20 175,488.20 175,237.53 175,237.53 175,199.60 175,199.60 175,405.27 175,405.27 175,660.37 175,660.37
106 Kayu Acuan (Kelas III/Meranti) M3 4,182,000 4,182,000 4,193,315.04 4,193,315.04 4,199,095.90 4,199,095.90 4,199,212.79 4,199,212.79 4,193,666.69 4,193,666.69 4,187,676.40 4,187,676.40 4,186,769.87 4,186,769.87 4,191,684.84 4,191,684.84 4,197,780.97 4,197,780.97
107 Kayu Perancah (Gelam) M3 2,694,000 2,694,000 2,701,289.03 2,701,289.03 2,705,013.00 2,705,013.00 2,705,088.30 2,705,088.30 2,701,515.56 2,701,515.56 2,697,656.68 2,697,656.68 2,697,072.70 2,697,072.70 2,700,238.87 2,700,238.87 2,704,165.94 2,704,165.94
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
110 Marmer Nama Jembatan Buah 584,000 584,000 585,580.10 585,580.10 586,387.38 586,387.38 586,403.70 586,403.70 585,629.21 585,629.21 584,792.69 584,792.69 584,666.09 584,666.09 585,352.45 585,352.45 586,203.75 586,203.75
111 Mata Kucing Buah 154,000 154,000 154,416.67 154,416.67 154,629.55 154,629.55 154,633.85 154,633.85 154,429.62 154,429.62 154,209.03 154,209.03 154,175.65 154,175.65 154,356.64 154,356.64 154,581.13 154,581.13
112 Matras Concrete (Tebal=10 cm) M2 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62
113 Mini Pile 16×16×16 M' 132,000 132,000 132,357.15 132,357.15 132,539.61 132,539.61 132,543.30 132,543.30 132,368.25 132,368.25 132,179.17 132,179.17 132,150.56 132,150.56 132,305.69 132,305.69 132,498.11 132,498.11
114 Mini Timber Pile Buah 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
115 Multipleks 12 mm Lbr 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 92,000 92,000 92,248.92 92,248.92 92,376.09 92,376.09 92,378.66 92,378.66 92,256.66 92,256.66 92,124.88 92,124.88 92,104.93 92,104.93 92,213.06 92,213.06 92,347.17 92,347.17
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,661,000 64,661,000 64,835,950.25 64,835,950.25 64,925,332.34 64,925,332.34 64,927,139.70 64,927,139.70 64,841,387.30 64,841,387.30 64,748,767.01 64,748,767.01 64,734,750.55 64,734,750.55 64,810,744.49 64,810,744.49 64,905,001.33 64,905,001.33
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 91,604,000 91,604,000 91,851,848.66 91,851,848.66 91,978,474.56 91,978,474.56 91,981,035.02 91,981,035.02 91,859,551.23 91,859,551.23 91,728,337.84 91,728,337.84 91,708,481.00 91,708,481.00 91,816,140.16 91,816,140.16 91,949,672.02 91,949,672.02
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 175,080,000 175,080,000 175,553,705.78 175,553,705.78 175,795,722.09 175,795,722.09 175,800,615.81 175,800,615.81 175,568,427.46 175,568,427.46 175,317,643.21 175,317,643.21 175,279,691.42 175,279,691.42 175,485,457.17 175,485,457.17 175,740,672.64 175,740,672.64
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 229,591,000 229,591,000 230,212,193.65 230,212,193.65 230,529,561.52 230,529,561.52 230,535,978.89 230,535,978.89 230,231,498.90 230,231,498.90 229,902,633.21 229,902,633.21 229,852,865.17 229,852,865.17 230,122,695.89 230,122,695.89 230,457,372.47 230,457,372.47
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 292,667,000 292,667,000 293,458,855.43 293,458,855.43 293,863,414.43 293,863,414.43 293,871,594.85 293,871,594.85 293,483,464.46 293,483,464.46 293,064,248.84 293,064,248.84 293,000,807.91 293,000,807.91 293,344,769.78 293,344,769.78 293,771,392.74 293,771,392.74
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 353,102,000 353,102,000 354,057,371.59 354,057,371.59 354,545,471.00 354,545,471.00 354,555,340.66 354,555,340.66 354,087,062.32 354,087,062.32 353,581,279.72 353,581,279.72 353,504,738.41 353,504,738.41 353,919,727.54 353,919,727.54 354,434,447.06 354,434,447.06
124 Pelat Rambu (Eng. Grade) Buah 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68 204,472.43 204,472.43 204,769.80 204,769.80
125 Pelat Rambu (High L Grade) Buah 238,000 238,000 238,643.95 238,643.95 238,972.94 238,972.94 238,979.59 238,979.59 238,663.96 238,663.96 238,323.05 238,323.05 238,271.46 238,271.46 238,551.17 238,551.17 238,898.10 238,898.10
126 Pemantul Cahaya (Reflector) Buah 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
127 Pipa Baja D10" Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
128 Pipa Drainase Baja Dia 3" M' 267,000 267,000 267,722.41 267,722.41 268,091.49 268,091.49 268,098.95 268,098.95 267,744.86 267,744.86 267,362.41 267,362.41 267,304.53 267,304.53 267,618.33 267,618.33 268,007.54 268,007.54
129 Pipa Galvanis Dia 1,5" M' 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
130 Pipa Galvanis Dia 2" M' 306,000 306,000 306,827.93 306,827.93 307,250.92 307,250.92 307,259.47 307,259.47 306,853.66 306,853.66 306,415.35 306,415.35 306,349.02 306,349.02 306,708.65 306,708.65 307,154.71 307,154.71
131 Pipa Galvanis Dia 3" M' 234,000 234,000 234,633.12 234,633.12 234,956.59 234,956.59 234,963.13 234,963.13 234,652.80 234,652.80 234,317.62 234,317.62 234,266.89 234,266.89 234,541.91 234,541.91 234,883.01 234,883.01
132 Pipa Porus M' 44,000 44,000 44,119.05 44,119.05 44,179.87 44,179.87 44,181.10 44,181.10 44,122.75 44,122.75 44,059.72 44,059.72 44,050.19 44,050.19 44,101.90 44,101.90 44,166.04 44,166.04
133 Pipa PVC Dia 4" M' 131,000 131,000 131,354.44 131,354.44 131,535.52 131,535.52 131,539.19 131,539.19 131,365.46 131,365.46 131,177.81 131,177.81 131,149.41 131,149.41 131,303.37 131,303.37 131,494.33 131,494.33
134 Plastik Filter M2 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
135 Rel Pengaman M' 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,998,000 1,998,000 2,003,405.90 2,003,405.90 2,006,167.77 2,006,167.77 2,006,223.61 2,006,223.61 2,003,573.90 2,003,573.90 2,000,711.97 2,000,711.97 2,000,278.86 2,000,278.86 2,002,627.05 2,002,627.05 2,005,539.55 2,005,539.55
137 Strip Bearing Buah 306,000 306,000 306,827.93 306,827.93 307,250.92 307,250.92 307,259.47 307,259.47 306,853.66 306,853.66 306,415.35 306,415.35 306,349.02 306,349.02 306,708.65 306,708.65 307,154.71 307,154.71
138 Tiang Pancang Baja Diameter 400 M' 708,000 708,000 709,915.60 709,915.60 710,894.28 710,894.28 710,914.07 710,914.07 709,975.14 709,975.14 708,961.00 708,961.00 708,807.53 708,807.53 709,639.61 709,639.61 710,671.67 710,671.67
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 865,000 865,000 867,340.39 867,340.39 868,536.10 868,536.10 868,560.27 868,560.27 867,413.12 867,413.12 866,174.10 866,174.10 865,986.60 865,986.60 867,003.20 867,003.20 868,264.12 868,264.12
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,809,000 1,809,000 1,813,894.53 1,813,894.53 1,816,395.14 1,816,395.14 1,816,445.70 1,816,445.70 1,814,046.64 1,814,046.64 1,811,455.43 1,811,455.43 1,811,063.30 1,811,063.30 1,813,189.35 1,813,189.35 1,815,826.35 1,815,826.35
HARGA SATUAN DASAR UPAH KABUPATEN BANGKALAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 117,302.82
2 Tukang OH 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 131,339.05
3 Mandor OH 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 151,390.81
4 Operator OH 312,295.36 312,295.36 311,979.74 311,979.74 311,525.91 311,525.91 311,354.68 311,354.68 311,618.40 311,618.40 312,065.74 312,065.74 312,280.99 312,280.99 311,804.92 311,804.92
5 Pembantu Operator OH 195,812.20 195,812.20 195,614.31 195,614.31 195,329.75 195,329.75 195,222.39 195,222.39 195,387.74 195,387.74 195,668.23 195,668.23 195,803.19 195,803.19 195,504.69 195,504.69
6 Sopir OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87
7 Pembantu Sopir OH 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 126,326.11
8 Mekanik OH 175,728.90 175,728.90 175,551.30 175,551.30 175,295.93 175,295.93 175,199.58 175,199.58 175,347.98 175,347.98 175,599.69 175,599.69 175,720.81 175,720.81 175,452.93 175,452.93
9 Pembantu Mekanik OH 126,524.81 126,524.81 126,396.94 126,396.94 126,213.07 126,213.07 126,143.70 126,143.70 126,250.54 126,250.54 126,431.78 126,431.78 126,518.98 126,518.98 126,326.11 126,326.11
10 Kepala Tukang OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87
11 Pemasak Aspal OH 146,608.11 146,608.11 146,459.94 146,459.94 146,246.89 146,246.89 146,166.51 146,166.51 146,290.31 146,290.31 146,500.31 146,500.31 146,601.36 146,601.36 146,377.87 146,377.87

HARGA SATUAN DASAR ALAT KABUPATEN BANGKALAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 460,035.10 514,132.56 459,570.16 513,612.95 458,901.64 512,865.80 458,649.41 512,583.91 459,037.89 513,018.08 459,696.84 513,754.52 460,013.92 514,108.89 459,312.65 934,354.04
2 Asphalt Distribution Unit/Jam 283,248.79 364,511.95 282,962.52 364,143.55 282,550.90 363,613.84 282,395.60 363,413.99 282,634.79 363,721.80 283,040.52 364,243.93 283,235.75 364,495.17 282,803.96 623,171.74
3 Asphalt Finisher Unit/Jam 208,041.35 986,090.18 207,831.09 985,093.58 207,528.77 983,660.59 207,414.70 983,119.93 207,590.38 983,952.64 207,888.38 985,365.12 208,031.77 986,044.79 207,714.64 1,174,943.19
4 Asphalt Liquid Mixer Unit/Jam 74,230.72 135,562.30 74,155.69 135,425.29 74,047.82 135,228.29 74,007.12 135,153.96 74,069.81 135,268.44 74,176.14 135,462.62 74,227.30 135,556.06 74,114.14 203,286.13
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 99,625.44 99,625.44 99,524.75 99,524.75 99,379.97 99,379.97 99,325.35 99,325.35 99,409.48 99,409.48 99,552.18 99,552.18 99,620.85 99,620.85 99,468.98 190,647.21
6 Asphalt Mixing Plant Unit/Jam 1,113,460.75 5,711,466.65 1,112,335.42 5,705,694.31 1,110,717.34 5,697,394.37 1,110,106.84 5,694,262.86 1,111,047.12 5,699,085.97 1,112,642.04 5,707,267.09 1,113,409.50 5,711,203.73 1,111,712.14 6,721,548.00
7 Asphalt Sprayer Unit/Jam 91,811.68 91,811.68 91,718.89 91,718.89 91,585.46 91,585.46 91,535.13 91,535.13 91,612.66 91,612.66 91,744.17 91,744.17 91,807.45 91,807.45 91,667.49 175,694.49
8 Asphalt Tanker Unit/Jam 429,756.78 498,065.91 429,322.44 497,562.54 428,697.92 496,838.75 428,462.29 496,565.67 428,825.20 496,986.26 429,440.79 497,699.69 429,737.00 498,042.99 429,081.88 890,601.60
9 Blending Equipment Unit/Jam 139,670.95 220,916.33 139,529.79 220,693.06 139,326.82 220,372.03 139,250.24 220,250.90 139,368.19 220,437.46 139,568.26 220,753.90 139,664.52 220,906.16 139,451.61 348,397.71
10 Bore Pile Machine Unit/Jam 384,827.66 668,773.99 384,438.73 668,098.09 383,879.50 667,126.22 383,668.51 666,759.54 383,993.48 667,324.30 384,544.70 668,282.25 384,809.95 668,743.21 384,223.32 1,019,922.00
11 Bore Pile Machine Dia 60 Unit/Jam 251,993.75 762,161.35 251,739.07 761,391.07 251,372.87 760,283.49 251,234.71 759,865.61 251,447.51 760,509.22 251,808.46 761,600.94 251,982.15 762,126.27 251,598.01 991,591.72
12 Bore Pile Machine Dia 80 Unit/Jam 996,254.36 996,254.36 995,247.48 995,247.48 993,799.72 993,799.72 993,253.49 993,253.49 994,094.79 994,094.79 995,521.83 995,521.83 996,208.50 996,208.50 994,689.81 1,906,472.13
13 Bulldozer 100-150 HP Unit/Jam 390,687.98 566,349.15 390,293.13 565,776.76 389,725.38 564,953.74 389,511.17 564,643.22 389,841.09 565,121.48 390,400.72 565,932.72 390,670.00 566,323.07 390,074.43 923,021.43
14 Cement Tanker Unit/Jam 363,339.82 468,945.13 362,972.61 468,471.18 362,444.60 467,789.71 362,245.39 467,532.59 362,552.22 467,928.60 363,072.67 468,600.32 363,323.10 468,923.54 362,769.22 800,741.06
15 Cold Milling Unit/Jam 567,474.30 1,207,006.51 566,900.77 1,205,786.64 566,076.12 1,204,032.61 565,764.98 1,203,370.83 566,244.19 1,204,390.10 567,057.04 1,206,119.02 567,448.17 1,206,950.95 566,583.11 1,724,469.35
16 Cold Recycler Unit/Jam 4,779,090.75 4,779,090.75 4,774,260.72 4,774,260.72 4,767,315.72 4,767,315.72 4,764,695.42 4,764,695.42 4,768,731.18 4,768,731.18 4,775,576.75 4,775,576.75 4,778,870.76 4,778,870.76 4,771,585.51 9,145,458.95
17 Compressor 4000-6500 L\M Unit/Jam 145,531.27 145,531.27 145,384.19 145,384.19 145,172.70 145,172.70 145,092.91 145,092.91 145,215.81 145,215.81 145,424.27 145,424.27 145,524.57 145,524.57 145,302.73 278,494.46
18 Concrete Breaker Unit/Jam 530,358.94 1,011,194.31 529,822.93 1,010,172.34 529,052.20 1,008,702.86 528,761.42 1,008,148.44 529,209.28 1,009,002.35 529,968.97 1,010,450.79 530,334.52 1,011,147.76 529,526.04 1,494,996.30
19 Concrete Mixer (350) Unit/Jam 98,648.72 98,648.72 98,549.02 98,549.02 98,405.66 98,405.66 98,351.57 98,351.57 98,434.88 98,434.88 98,576.18 98,576.18 98,644.17 98,644.17 98,493.79 188,778.12
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 112,322.80 112,322.80 112,209.28 112,209.28 112,046.05 112,046.05 111,984.46 111,984.46 112,079.31 112,079.31 112,240.21 112,240.21 112,317.62 112,317.62 112,146.40 214,945.39
21 Concrete Pan Mixer Unit/Jam 298,876.31 639,653.20 298,574.25 639,006.73 298,139.92 638,077.18 297,976.05 637,726.47 298,228.44 638,266.63 298,656.55 639,182.87 298,862.55 639,623.76 298,406.94 912,183.37
22 Concrete Pump Unit/Jam 227,575.75 244,012.13 227,345.75 243,765.52 227,015.03 243,410.92 226,890.26 243,277.13 227,082.44 243,483.19 227,408.42 243,832.71 227,565.27 244,000.90 227,218.36 451,908.61
23 Concrete Vibrator Unit/Jam 84,974.64 84,974.64 84,888.76 84,888.76 84,765.27 84,765.27 84,718.68 84,718.68 84,790.44 84,790.44 84,912.16 84,912.16 84,970.72 84,970.72 84,841.19 162,610.86
24 Crane 10-15 Ton Unit/Jam 304,736.63 304,736.63 304,428.64 304,428.64 303,985.80 303,985.80 303,818.71 303,818.71 304,076.05 304,076.05 304,512.56 304,512.56 304,722.60 304,722.60 304,258.06 583,156.18
25 Crane On Track 35 Ton Unit/Jam 252,970.47 480,995.11 252,714.80 480,508.99 252,347.18 479,810.00 252,208.48 479,546.28 252,422.11 479,952.46 252,784.46 480,641.44 252,958.82 480,972.97 252,573.20 711,760.93
26 Crane On Track 75-100 Ton Unit/Jam 397,525.02 602,499.09 397,123.26 601,890.17 396,545.58 601,014.61 396,327.62 600,684.27 396,663.31 601,193.06 397,232.73 602,056.08 397,506.72 602,471.36 396,900.74 965,371.93
27 Dump Truck 10 Ton Unit/Jam 376,037.18 404,678.56 375,657.14 404,269.56 375,110.68 403,681.48 374,904.50 403,459.60 375,222.05 403,801.34 375,760.69 404,381.00 376,019.87 404,659.93 375,446.64 748,196.17
28 Dump Truck 3-4 M3 Unit/Jam 205,111.19 268,112.10 204,903.89 267,841.13 204,605.83 267,451.50 204,493.37 267,304.50 204,666.57 267,530.91 204,960.38 267,914.96 205,101.75 268,099.75 204,789.08 455,410.93
29 Excavator 80-140 HP Unit/Jam 296,922.87 471,957.62 296,622.78 471,480.63 296,191.29 470,794.78 296,028.49 470,536.01 296,279.23 470,934.56 296,704.54 471,610.60 296,909.20 471,935.90 296,456.57 742,963.33
30 Flat Bed Truck 3-4 M3 Unit/Jam 360,409.66 481,999.27 360,045.41 481,512.14 359,521.66 480,811.69 359,324.06 480,547.42 359,628.41 480,954.45 360,144.66 481,644.87 360,393.07 481,977.08 359,843.66 811,092.99
31 Fulvi Mixer Unit/Jam 902,489.24 1,409,847.87 901,577.13 1,408,423.00 900,265.63 1,406,374.20 899,770.81 1,405,601.20 900,532.93 1,406,791.76 901,825.65 1,408,811.23 902,447.70 1,409,782.97 901,071.94 2,233,601.32
32 Generator Set Unit/Jam 401,431.90 425,766.02 401,026.19 425,335.72 400,442.83 424,716.99 400,222.73 424,483.55 400,561.72 424,843.10 401,136.74 425,452.96 401,413.42 425,746.42 400,801.48 792,492.03
33 Hot Recycler Unit/Jam 2,948,717.55 8,646,866.11 2,945,737.41 8,638,127.09 2,941,452.31 8,625,561.41 2,939,835.58 8,620,820.47 2,942,325.65 8,628,122.41 2,946,549.40 8,640,508.20 2,948,581.81 8,646,468.08 2,944,086.79 11,331,983.69
34 Jack Hammer Unit/Jam 55,673.04 55,673.04 55,616.77 55,616.77 55,535.87 55,535.87 55,505.34 55,505.34 55,552.36 55,552.36 55,632.10 55,632.10 55,670.47 55,670.47 55,585.61 106,538.15
35 Launching Gantry Unit/Jam 70,850,288.98 70,850,288.98 70,778,683.57 70,778,683.57 70,675,723.53 70,675,723.53 70,636,877.39 70,636,877.39 70,696,707.70 70,696,707.70 70,798,193.79 70,798,193.79 70,847,027.57 70,847,027.57 70,739,023.33 135,581,942.93
36 Motor Grader > 100 HP Unit/Jam 278,365.19 467,940.96 278,083.86 467,468.03 277,679.33 466,788.02 277,526.71 466,531.45 277,761.78 466,926.61 278,160.51 467,596.89 278,352.37 467,919.42 277,928.03 721,968.80
37 Pedestrian Roller Unit/Jam 91,811.68 91,811.68 91,718.89 91,718.89 91,585.46 91,585.46 91,535.13 91,535.13 91,612.66 91,612.66 91,744.17 91,744.17 91,807.45 91,807.45 91,667.49 175,694.49
38 Pile Driver + Hammer Unit/Jam 104,509.04 305,266.21 104,403.41 304,957.69 104,251.54 304,514.07 104,194.24 304,346.70 104,282.49 304,604.48 104,432.19 305,041.75 104,504.22 305,252.15 104,344.91 400,434.56
39 Rock Drill Breaker Unit/Jam 101,578.88 330,370.33 101,476.21 330,036.44 101,328.60 329,556.35 101,272.90 329,375.21 101,358.68 329,654.19 101,504.19 330,127.42 101,574.20 330,355.13 101,419.35 422,817.55
40 Split Form Paver Unit/Jam 214,878.39 214,878.39 214,661.22 214,661.22 214,348.96 214,348.96 214,231.14 214,231.14 214,412.60 214,412.60 214,720.39 214,720.39 214,868.50 214,868.50 214,540.94 411,199.87
41 Stone Crusher Unit/Jam 575,288.05 716,973.92 574,706.64 716,249.30 573,870.62 715,207.39 573,555.20 714,814.29 574,041.01 715,419.74 574,865.05 716,446.74 575,261.57 716,940.91 574,384.60 1,242,357.55
42 Tamper Unit/Jam 85,951.36 85,951.36 85,864.49 85,864.49 85,739.58 85,739.58 85,692.46 85,692.46 85,765.04 85,765.04 85,888.16 85,888.16 85,947.40 85,947.40 85,816.38 164,479.95
43 Tandem Roller 6-8 T Unit/Jam 415,105.98 484,007.60 414,686.45 483,518.44 414,083.22 482,815.07 413,855.62 482,549.70 414,206.16 482,958.43 414,800.76 483,651.72 415,086.87 483,985.32 414,454.09 863,156.80
44 Three Wheel Roller 6-8 T Unit/Jam 137,717.51 173,720.57 137,578.33 173,545.00 137,378.20 173,292.55 137,302.69 173,197.30 137,418.99 173,344.00 137,616.25 173,592.84 137,711.17 173,712.57 137,501.24 299,488.25
45 Tire Roller 8-10 T Unit/Jam 246,133.43 444,845.16 245,884.67 444,395.58 245,526.99 443,749.12 245,392.04 443,505.22 245,599.89 443,880.88 245,952.45 444,518.07 246,122.10 444,824.68 245,746.89 669,410.43
46 Track Loader 75-100 HP Unit/Jam 230,505.91 303,257.88 230,272.95 302,951.39 229,937.97 302,510.69 229,811.59 302,344.42 230,006.25 302,600.51 230,336.42 303,034.89 230,495.30 303,243.92 230,143.92 513,743.03
47 Trailer 20 Ton Unit/Jam 372,130.30 515,136.72 371,754.21 514,616.10 371,213.43 513,867.50 371,009.39 513,585.05 371,323.64 514,020.07 371,856.68 514,757.95 372,113.17 515,113.01 371,545.90 854,905.25
48 Trailler 15 Ton Unit/Jam 322,317.59 490,032.59 321,991.83 489,537.34 321,523.44 488,825.22 321,346.72 488,556.54 321,618.90 488,970.36 322,080.59 489,672.28 322,302.75 490,010.04 321,811.41 784,251.43
49 Truck Mixer (agitator) Unit/Jam 405,338.78 595,469.93 404,929.12 594,868.12 404,340.08 594,002.78 404,117.84 593,676.29 404,460.13 594,179.14 405,040.74 595,032.09 405,320.12 595,442.52 404,702.22 965,505.05
50 Vibrating Rammer Unit/Jam 83,021.20 83,021.20 82,937.29 82,937.29 82,816.64 82,816.64 82,771.12 82,771.12 82,841.23 82,841.23 82,960.15 82,960.15 83,017.37 83,017.37 82,890.82 158,872.68
51 Vibratory Roller 5-8 T Unit/Jam 200,227.59 429,782.68 200,025.23 429,348.32 199,734.26 428,723.76 199,624.48 428,488.12 199,793.56 428,851.05 200,080.37 429,466.67 200,218.37 429,762.90 199,913.15 612,358.11
52 Water Pump 70-100 MM Unit/Jam 62,510.08 62,510.08 62,446.90 62,446.90 62,356.06 62,356.06 62,321.79 62,321.79 62,374.57 62,374.57 62,464.11 62,464.11 62,507.20 62,507.20 62,411.91 119,621.78
53 Water Tanker 3000-4500 L Unit/Jam 226,599.03 226,599.03 226,370.02 226,370.02 226,040.72 226,040.72 225,916.48 225,916.48 226,107.83 226,107.83 226,432.42 226,432.42 226,588.60 226,588.60 226,243.17 433,628.95
54 Welding Set Unit/Jam 126,973.59 126,973.59 126,845.27 126,845.27 126,660.75 126,660.75 126,591.13 126,591.13 126,698.36 126,698.36 126,880.23 126,880.23 126,967.75 126,967.75 126,774.19 242,981.74
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 220,738.71 351,457.80 220,515.62 351,102.60 220,194.84 350,591.86 220,073.81 350,399.16 220,260.22 350,695.95 220,576.40 351,199.38 220,728.55 351,441.62 220,392.05 552,928.22
HARGA SATUAN DASAR BAHAN KABUPATEN BANGKALAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 307,274.54 307,274.54 306,963.99 306,963.99 306,517.45 306,517.45 306,348.98 306,348.98 306,608.46 306,608.46 307,048.60 307,048.60 307,260.39 307,260.39 306,791.98 588,012.83
2 Agregat Pecah Mesin 20-30 mm M3 293,216.22 293,216.22 292,919.88 292,919.88 292,493.78 292,493.78 292,333.01 292,333.01 292,580.62 292,580.62 293,000.63 293,000.63 293,202.73 293,202.73 292,755.75 561,110.28
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 336,395.33 336,395.33 336,055.34 336,055.34 335,566.49 335,566.49 335,382.05 335,382.05 335,666.13 335,666.13 336,147.98 336,147.98 336,379.84 336,379.84 335,867.04 643,739.53
4 Bahan Agr. Base Kelas A M3 322,337.01 322,337.01 322,011.24 322,011.24 321,542.82 321,542.82 321,366.09 321,366.09 321,638.29 321,638.29 322,100.00 322,100.00 322,322.18 322,322.18 321,830.80 616,836.98
5 Bahan Agr. Base Kelas B M3 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
6 Bahan Agr. Base Kelas C M3 278,153.75 278,153.75 277,872.63 277,872.63 277,468.41 277,468.41 277,315.91 277,315.91 277,550.80 277,550.80 277,949.22 277,949.22 278,140.94 278,140.94 277,716.92 532,286.12
7 Bahan Agr. Base Kelas C2 M3 254,053.78 254,053.78 253,797.02 253,797.02 253,427.83 253,427.83 253,288.54 253,288.54 253,503.07 253,503.07 253,866.98 253,866.98 254,042.09 254,042.09 253,654.81 486,167.47
8 Bahan Agr. Base Kelas S M3 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38 205,530.58 393,930.16
9 Bahan Pilihan M3 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26 204,527.99 392,008.55
10 Bahan Tanah Timbunan M3 117,487.32 117,487.32 117,368.58 117,368.58 117,197.85 117,197.85 117,133.43 117,133.43 117,232.65 117,232.65 117,400.94 117,400.94 117,481.91 117,481.91 117,302.82 224,828.43
11 Batu Belah/Kerakal M3 331,374.50 331,374.50 331,039.59 331,039.59 330,558.04 330,558.04 330,376.35 330,376.35 330,656.18 330,656.18 331,130.84 331,130.84 331,359.25 331,359.25 330,854.10 634,131.48
12 Batu Kali M3 341,851.96 341,851.96 341,506.46 341,506.46 341,009.68 341,009.68 340,822.25 340,822.25 341,110.93 341,110.93 341,600.60 341,600.60 341,836.22 341,836.22 341,315.10 654,181.56
13 Chipping M3 217,903.84 217,903.84 217,683.61 217,683.61 217,366.95 217,366.95 217,247.48 217,247.48 217,431.49 217,431.49 217,743.62 217,743.62 217,893.81 217,893.81 217,561.63 416,989.49
14 Chipping (kg) Kg 264.10 264.10 263.83 263.83 263.44 263.44 263.30 263.30 263.52 263.52 263.90 263.90 264.08 264.08 263.68 505.38
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 389,616.08 389,616.08 389,222.31 389,222.31 388,656.12 388,656.12 388,442.50 388,442.50 388,771.51 388,771.51 389,329.60 389,329.60 389,598.14 389,598.14 389,004.21 745,584.89
18 Kapur M3 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
19 Pasir Beton (Kasar) M3 463,924.30 463,924.30 463,455.43 463,455.43 462,781.25 462,781.25 462,526.89 462,526.89 462,918.66 462,918.66 463,583.18 463,583.18 463,902.94 463,902.94 463,195.74 887,784.07
20 Pasir Halus (untuk HRS) M3 293,216.22 293,216.22 292,919.88 292,919.88 292,493.78 292,493.78 292,333.01 292,333.01 292,580.62 292,580.62 293,000.63 293,000.63 293,202.73 293,202.73 292,755.75 561,110.28
21 Pasir Pasang (Sedang) M3 328,362.00 328,362.00 328,030.14 328,030.14 327,552.97 327,552.97 327,372.93 327,372.93 327,650.22 327,650.22 328,120.56 328,120.56 328,346.89 328,346.89 327,846.33 628,366.65
22 Pasir Urug M3 198,824.70 198,824.70 198,623.76 198,623.76 198,334.82 198,334.82 198,225.81 198,225.81 198,393.71 198,393.71 198,678.51 198,678.51 198,815.55 198,815.55 198,512.46 380,478.89
23 Pasir Urug (ada unsur lempung) M3 351,457.80 351,457.80 351,102.60 351,102.60 350,591.86 350,591.86 350,399.16 350,399.16 350,695.95 350,695.95 351,199.38 351,199.38 351,441.62 351,441.62 350,905.86 672,563.69
24 Sirtu M3 151,628.94 151,628.94 151,475.69 151,475.69 151,255.34 151,255.34 151,172.21 151,172.21 151,300.25 151,300.25 151,517.45 151,517.45 151,621.96 151,621.96 151,390.81 290,163.19
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
26 Anti Pengelupas Liter 98,408.18 98,408.18 98,308.73 98,308.73 98,165.72 98,165.72 98,111.76 98,111.76 98,194.87 98,194.87 98,335.83 98,335.83 98,403.65 98,403.65 98,253.64 188,317.83
27 Arbocell Kg 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
28 Asbuton Curah Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
37 Assetilline Botol 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
39 Bensin Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
40 Beton B-0 M3 576,264.77 576,264.77 575,682.37 575,682.37 574,844.94 574,844.94 574,528.98 574,528.98 575,015.61 575,015.61 575,841.06 575,841.06 576,238.25 576,238.25 575,359.79 1,102,763.29
41 Beton K-125 (fc' 10 MPa) M3 595,799.17 595,799.17 595,197.02 595,197.02 594,331.21 594,331.21 594,004.54 594,004.54 594,507.67 594,507.67 595,361.09 595,361.09 595,771.75 595,771.75 594,863.51 1,140,145.10
42 Beton K-175 (fc' 15 MPa) M3 644,635.17 644,635.17 643,983.67 643,983.67 643,046.88 643,046.88 642,693.43 642,693.43 643,237.80 643,237.80 644,161.18 644,161.18 644,605.50 644,605.50 643,622.82 1,233,599.61
43 Beton K-250 (fc' 20 MPa) M3 717,889.17 717,889.17 717,163.63 717,163.63 716,120.39 716,120.39 715,726.78 715,726.78 716,333.01 716,333.01 717,361.32 717,361.32 717,856.12 717,856.12 716,761.77 1,373,781.39
44 Beton K-300 (fc' 25 MPa) M3 747,190.77 747,190.77 746,435.61 746,435.61 745,349.79 745,349.79 744,940.12 744,940.12 745,571.09 745,571.09 746,641.37 746,641.37 747,156.37 747,156.37 746,017.35 1,429,854.10
45 Beton K-350 (fc' 30 MPa) M3 776,492.37 776,492.37 775,707.60 775,707.60 774,579.19 774,579.19 774,153.46 774,153.46 774,809.17 774,809.17 775,921.42 775,921.42 776,456.62 776,456.62 775,272.94 1,485,926.81
46 Beton K-400 (fc' 35 MPa) M3 805,793.96 805,793.96 804,979.58 804,979.58 803,808.60 803,808.60 803,366.79 803,366.79 804,047.26 804,047.26 805,201.48 805,201.48 805,756.87 805,756.87 804,528.52 1,541,999.52
47 Beton K-450 (fc' 40 MPa) M3 844,862.76 844,862.76 844,008.90 844,008.90 842,781.14 842,781.14 842,317.91 842,317.91 843,031.36 843,031.36 844,241.55 844,241.55 844,823.87 844,823.87 843,535.96 1,616,763.13
48 Beton K-500 (fc' 45 MPa) M3 879,047.96 879,047.96 878,159.54 878,159.54 876,882.11 876,882.11 876,400.14 876,400.14 877,142.46 877,142.46 878,401.61 878,401.61 879,007.50 879,007.50 877,667.48 1,682,181.29
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 76,316.55 76,316.55 76,239.42 76,239.42 76,128.52 76,128.52 76,086.67 76,086.67 76,151.12 76,151.12 76,260.44 76,260.44 76,313.04 76,313.04 76,196.70 146,042.40
51 Cat Anti Karat Kg 71,295.73 71,295.73 71,223.67 71,223.67 71,120.06 71,120.06 71,080.97 71,080.97 71,141.18 71,141.18 71,243.30 71,243.30 71,292.44 71,292.44 71,183.76 136,434.35
52 Cat Marka (Non Thermoplas) Kg 63,486.80 63,486.80 63,422.63 63,422.63 63,330.37 63,330.37 63,295.57 63,295.57 63,349.18 63,349.18 63,440.12 63,440.12 63,483.87 63,483.87 63,387.10 121,490.87
53 Cat Marka (Thermoplastic) Kg 43,366.37 43,366.37 43,322.54 43,322.54 43,259.52 43,259.52 43,235.74 43,235.74 43,272.36 43,272.36 43,334.48 43,334.48 43,364.37 43,364.37 43,298.26 82,987.61
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,274,285.58 1,274,285.58 1,272,997.71 1,272,997.71 1,271,145.91 1,271,145.91 1,270,447.24 1,270,447.24 1,271,523.32 1,271,523.32 1,273,348.61 1,273,348.61 1,274,226.92 1,274,226.92 1,272,284.40 2,438,523.78
57 Curing Compound Liter 49,204.09 49,204.09 49,154.36 49,154.36 49,082.86 49,082.86 49,055.88 49,055.88 49,097.43 49,097.43 49,167.91 49,167.91 49,201.83 49,201.83 49,126.82 94,158.92
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 595,469.93 595,469.93 594,868.12 594,868.12 594,002.78 594,002.78 593,676.29 593,676.29 594,179.14 594,179.14 595,032.09 595,032.09 595,442.52 595,442.52 594,534.79 1,139,515.05
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 693,878.12 693,878.12 693,176.85 693,176.85 692,168.50 692,168.50 691,788.06 691,788.06 692,374.01 692,374.01 693,367.92 693,367.92 693,846.18 693,846.18 692,788.43 1,327,832.88
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 878,644.51 878,644.51 877,756.50 877,756.50 876,479.65 876,479.65 875,997.90 875,997.90 876,739.88 876,739.88 877,998.45 877,998.45 878,604.06 878,604.06 877,264.65 1,681,409.22
61 Kerosen/Minyak Tanah Liter 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
64 Oxygen (Isi 6 M3) Botol 167,695.58 167,695.58 167,526.10 167,526.10 167,282.40 167,282.40 167,190.46 167,190.46 167,332.07 167,332.07 167,572.28 167,572.28 167,687.86 167,687.86 167,432.23 320,908.96
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,347,589.63 1,347,589.63 1,346,227.68 1,346,227.68 1,344,269.36 1,344,269.36 1,343,530.49 1,343,530.49 1,344,668.48 1,344,668.48 1,346,598.77 1,346,598.77 1,347,527.60 1,347,527.60 1,345,473.33 2,578,801.35
67 Seal Coat M2 107,445.67 107,445.67 107,337.08 107,337.08 107,180.94 107,180.94 107,122.03 107,122.03 107,212.76 107,212.76 107,366.67 107,366.67 107,440.73 107,440.73 107,276.93 205,612.33
68 Seal Guard Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
69 Semen/PC (50 kg) Zak 71,295.73 71,295.73 71,223.67 71,223.67 71,120.06 71,120.06 71,080.97 71,080.97 71,141.18 71,141.18 71,243.30 71,243.30 71,292.44 71,292.44 71,183.76 136,434.35
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 39,162.44 39,162.44 39,122.86 39,122.86 39,065.95 39,065.95 39,044.48 39,044.48 39,077.55 39,077.55 39,133.65 39,133.65 39,160.64 39,160.64 39,100.94 74,942.81
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02 17,044.00 32,667.38
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
81 Baja Tulangan (Ulir) D19 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,697,668.33 12,697,668.33 12,684,835.33 12,684,835.33 12,666,383.01 12,666,383.01 12,659,421.07 12,659,421.07 12,670,143.76 12,670,143.76 12,688,331.92 12,688,331.92 12,697,083.83 12,697,083.83 12,677,727.49 24,298,765.30
87 Box Culvert Type DUB 200×200 M' 13,478,908.82 13,478,908.82 13,465,286.25 13,465,286.25 13,445,698.62 13,445,698.62 13,438,308.34 13,438,308.34 13,449,690.76 13,449,690.76 13,468,997.97 13,468,997.97 13,478,288.35 13,478,288.35 13,457,741.09 25,793,778.30
88 Box Culvert Type uk 300×200 M' 14,553,365.53 14,553,365.53 14,538,657.06 14,538,657.06 14,517,508.02 14,517,508.02 14,509,528.63 14,509,528.63 14,521,818.38 14,521,818.38 14,542,664.65 14,542,664.65 14,552,695.60 14,552,695.60 14,530,510.44 27,849,901.58
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 189,787.21 189,787.21 189,595.40 189,595.40 189,319.60 189,319.60 189,215.55 189,215.55 189,375.81 189,375.81 189,647.67 189,647.67 189,778.48 189,778.48 189,489.17 363,184.39
91 Ducting (Strand Prestress) M' 164,683.08 164,683.08 164,516.65 164,516.65 164,277.33 164,277.33 164,187.03 164,187.03 164,326.10 164,326.10 164,562.00 164,562.00 164,675.50 164,675.50 164,424.46 315,144.13
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,125,817.62 2,125,817.62 2,123,669.15 2,123,669.15 2,120,579.90 2,120,579.90 2,119,414.35 2,119,414.35 2,121,209.52 2,121,209.52 2,124,254.54 2,124,254.54 2,125,719.77 2,125,719.77 2,122,479.17 4,068,049.52
94 Expansion Join Tipe Rubber M' 1,538,381.01 1,538,381.01 1,536,826.23 1,536,826.23 1,534,590.65 1,534,590.65 1,533,747.18 1,533,747.18 1,535,046.28 1,535,046.28 1,537,249.86 1,537,249.86 1,538,310.20 1,538,310.20 1,535,965.09 2,943,907.35
95 Expansion Join Tipe Torma M' 1,765,322.34 1,765,322.34 1,763,538.20 1,763,538.20 1,760,972.82 1,760,972.82 1,760,004.92 1,760,004.92 1,761,495.67 1,761,495.67 1,764,024.32 1,764,024.32 1,765,241.07 1,765,241.07 1,762,550.01 3,378,191.33
96 Expansion Tipe Joint Asphaltic Plug M' 2,093,684.34 2,093,684.34 2,091,568.34 2,091,568.34 2,088,525.79 2,088,525.79 2,087,377.85 2,087,377.85 2,089,145.89 2,089,145.89 2,092,144.88 2,092,144.88 2,093,587.96 2,093,587.96 2,090,396.35 4,006,557.98
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 41,170.77 41,170.77 41,129.16 41,129.16 41,069.33 41,069.33 41,046.76 41,046.76 41,081.53 41,081.53 41,140.50 41,140.50 41,168.88 41,168.88 41,106.12 78,786.03
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
99 Glass Bead Kg 68,283.23 68,283.23 68,214.22 68,214.22 68,114.99 68,114.99 68,077.55 68,077.55 68,135.21 68,135.21 68,233.02 68,233.02 68,280.09 68,280.09 68,176.00 130,669.52
100 Joint Sealent Kg 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
101 Joint Socket Pile 16×16×16 Set 89,370.70 89,370.70 89,280.38 89,280.38 89,150.50 89,150.50 89,101.50 89,101.50 89,176.97 89,176.97 89,304.99 89,304.99 89,366.58 89,366.58 89,230.35 171,023.34
102 Joint Socket Pile 35×35 Set 764,169.68 764,169.68 763,397.37 763,397.37 762,286.87 762,286.87 761,867.89 761,867.89 762,513.20 762,513.20 763,607.80 763,607.80 764,134.50 764,134.50 762,969.60 1,462,345.62
103 Kawat Beton Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
104 Kawat Bronjong Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
105 Kawat Las Dos 175,728.90 175,728.90 175,551.30 175,551.30 175,295.93 175,295.93 175,199.58 175,199.58 175,347.98 175,347.98 175,599.69 175,599.69 175,720.81 175,720.81 175,452.93 336,281.84
106 Kayu Acuan (Kelas III/Meranti) M3 4,199,418.66 4,199,418.66 4,195,174.48 4,195,174.48 4,189,071.87 4,189,071.87 4,186,769.39 4,186,769.39 4,190,315.63 4,190,315.63 4,196,330.89 4,196,330.89 4,199,225.35 4,199,225.35 4,192,823.75 8,036,175.28
107 Kayu Perancah (Gelam) M3 2,705,220.92 2,705,220.92 2,702,486.86 2,702,486.86 2,698,555.62 2,698,555.62 2,697,072.39 2,697,072.39 2,699,356.84 2,699,356.84 2,703,231.81 2,703,231.81 2,705,096.39 2,705,096.39 2,700,972.55 5,176,818.80
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 176,788.17
110 Marmer Nama Jembatan Buah 586,432.45 586,432.45 585,839.77 585,839.77 584,987.56 584,987.56 584,666.03 584,666.03 585,161.25 585,161.25 586,001.25 586,001.25 586,405.45 586,405.45 585,511.50 1,122,220.56
111 Mata Kucing Buah 154,641.43 154,641.43 154,485.14 154,485.14 154,260.42 154,260.42 154,175.63 154,175.63 154,306.22 154,306.22 154,527.73 154,527.73 154,634.31 154,634.31 154,398.58 295,928.02
112 Matras Concrete (Tebal=10 cm) M2 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 274,790.31
113 Mini Pile 16×16×16 M' 132,549.80 132,549.80 132,415.84 132,415.84 132,223.22 132,223.22 132,150.54 132,150.54 132,262.47 132,262.47 132,452.34 132,452.34 132,543.70 132,543.70 132,341.64 253,652.59
114 Mini Timber Pile Buah 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
115 Multipleks 12 mm Lbr 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 92,383.19 92,383.19 92,289.83 92,289.83 92,155.57 92,155.57 92,104.92 92,104.92 92,182.94 92,182.94 92,315.27 92,315.27 92,378.94 92,378.94 92,238.11 176,788.17
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,930,322.82 64,930,322.82 64,864,700.47 64,864,700.47 64,770,343.35 64,770,343.35 64,734,743.04 64,734,743.04 64,789,574.17 64,789,574.17 64,882,580.49 64,882,580.49 64,927,333.92 64,927,333.92 64,828,354.08 124,253,259.21
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 91,985,544.47 91,985,544.47 91,892,578.55 91,892,578.55 91,758,904.63 91,758,904.63 91,708,470.35 91,708,470.35 91,786,148.56 91,786,148.56 91,917,908.84 91,917,908.84 91,981,310.16 91,981,310.16 91,841,087.32 176,027,212.03
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 175,809,234.60 175,809,234.60 175,631,551.60 175,631,551.60 175,376,064.61 175,376,064.61 175,279,671.07 175,279,671.07 175,428,135.12 175,428,135.12 175,679,964.62 175,679,964.62 175,801,141.68 175,801,141.68 175,533,137.93 336,435,573.58
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 230,547,281.14 230,547,281.14 230,314,276.69 230,314,276.69 229,979,244.06 229,979,244.06 229,852,838.48 229,852,838.48 230,047,526.68 230,047,526.68 230,377,763.06 230,377,763.06 230,536,668.50 230,536,668.50 230,185,222.02 441,184,485.80
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 293,886,002.19 293,886,002.19 293,588,983.96 293,588,983.96 293,161,907.13 293,161,907.13 293,000,773.90 293,000,773.90 293,248,949.18 293,248,949.18 293,669,912.07 293,669,912.07 293,872,473.91 293,872,473.91 293,424,473.84 562,391,992.31
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 354,572,723.08 354,572,723.08 354,214,371.33 354,214,371.33 353,699,104.21 353,699,104.21 353,504,697.37 353,504,697.37 353,804,120.22 353,804,120.22 354,312,010.89 354,312,010.89 354,556,401.25 354,556,401.25 354,015,890.28 678,524,525.37
124 Pelat Rambu (Eng. Grade) Buah 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26 204,527.99 392,008.55
125 Pelat Rambu (High L Grade) Buah 238,991.31 238,991.31 238,749.77 238,749.77 238,402.46 238,402.46 238,271.43 238,271.43 238,473.25 238,473.25 238,815.58 238,815.58 238,980.30 238,980.30 238,615.99 457,343.31
126 Pemantul Cahaya (Reflector) Buah 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
127 Pipa Baja D10" Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
128 Pipa Drainase Baja Dia 3" M' 268,112.10 268,112.10 267,841.13 267,841.13 267,451.50 267,451.50 267,304.50 267,304.50 267,530.91 267,530.91 267,914.96 267,914.96 268,099.75 268,099.75 267,691.04 513,070.01
129 Pipa Galvanis Dia 1,5" M' 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 203,690.72
130 Pipa Galvanis Dia 2" M' 307,274.54 307,274.54 306,963.99 306,963.99 306,517.45 306,517.45 306,348.98 306,348.98 306,608.46 306,608.46 307,048.60 307,048.60 307,260.39 307,260.39 306,791.98 588,012.83
131 Pipa Galvanis Dia 3" M' 234,974.65 234,974.65 234,737.17 234,737.17 234,395.70 234,395.70 234,266.87 234,266.87 234,465.29 234,465.29 234,801.87 234,801.87 234,963.83 234,963.83 234,605.63 449,656.87
132 Pipa Porus M' 44,183.27 44,183.27 44,138.61 44,138.61 44,074.41 44,074.41 44,050.18 44,050.18 44,087.49 44,087.49 44,150.78 44,150.78 44,181.23 44,181.23 44,113.88 84,550.86
133 Pipa PVC Dia 4" M' 131,545.63 131,545.63 131,412.69 131,412.69 131,221.52 131,221.52 131,149.40 131,149.40 131,260.48 131,260.48 131,448.91 131,448.91 131,539.58 131,539.58 131,339.05 251,730.98
134 Plastik Filter M2 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
135 Rel Pengaman M' 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,006,321.97 2,006,321.97 2,004,294.27 2,004,294.27 2,001,378.67 2,001,378.67 2,000,278.63 2,000,278.63 2,001,972.89 2,001,972.89 2,004,846.75 2,004,846.75 2,006,229.62 2,006,229.62 2,003,171.18 3,839,377.86
137 Strip Bearing Buah 307,274.54 307,274.54 306,963.99 306,963.99 306,517.45 306,517.45 306,348.98 306,348.98 306,608.46 306,608.46 307,048.60 307,048.60 307,260.39 307,260.39 306,791.98 588,012.83
138 Tiang Pancang Baja Diameter 400 M' 710,948.93 710,948.93 710,230.40 710,230.40 709,197.25 709,197.25 708,807.44 708,807.44 709,407.81 709,407.81 710,426.18 710,426.18 710,916.20 710,916.20 709,832.43 1,360,500.26
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 868,602.86 868,602.86 867,725.00 867,725.00 866,462.74 866,462.74 865,986.49 865,986.49 866,720.00 866,720.00 867,964.18 867,964.18 868,562.87 868,562.87 867,238.77 1,662,193.12
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,816,534.76 1,816,534.76 1,814,698.86 1,814,698.86 1,812,059.06 1,812,059.06 1,811,063.09 1,811,063.09 1,812,597.08 1,812,597.08 1,815,199.09 1,815,199.09 1,816,451.14 1,816,451.14 1,813,682.01 3,476,193.47
HARGA SATUAN DASAR UPAH KABUPATEN SAMPANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
2 Tukang OH 129,000 129,000 129,349.03 129,349.03 129,527.35 129,527.35 129,530.95 129,530.95 129,359.88 129,359.88 129,175.10 129,175.10 129,147.13 129,147.13 129,298.74 129,298.74 129,486.79 129,486.79
3 Mandor OH 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
4 Operator OH 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
5 Pembantu Operator OH 192,000 192,000 192,519.49 192,519.49 192,784.89 192,784.89 192,790.26 192,790.26 192,535.63 192,535.63 192,260.61 192,260.61 192,218.99 192,218.99 192,444.64 192,444.64 192,724.52 192,724.52
6 Sopir OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
7 Pembantu Sopir OH 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
8 Mekanik OH 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
9 Pembantu Mekanik OH 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
10 Kepala Tukang OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
11 Pemasak Aspal OH 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39

HARGA SATUAN DASAR ALAT KABUPATEN SAMPANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 451,811 505,000 453,033.38 506,366.35 453,657.92 507,064.43 453,670.55 507,078.54 453,071.37 506,408.82 452,424.19 505,685.46 452,326.26 505,575.99 452,857.25 506,169.50 453,515.86 506,905.64
2 Asphalt Distribution Unit/Jam 278,185 358,000 278,937.75 358,968.62 279,322.29 359,463.49 279,330.06 359,473.50 278,961.14 358,998.73 278,562.67 358,485.93 278,502.37 358,408.32 278,829.31 358,829.07 279,234.82 359,350.93
3 Asphalt Finisher Unit/Jam 204,322 969,000 204,874.97 971,621.78 205,157.40 972,961.24 205,163.12 972,988.33 204,892.15 971,703.26 204,599.48 970,315.26 204,555.19 970,105.21 204,795.32 971,244.05 205,093.16 972,656.57
4 Asphalt Liquid Mixer Unit/Jam 72,904 133,000 73,100.93 133,359.85 73,201.70 133,543.70 73,203.74 133,547.42 73,107.06 133,371.04 73,002.63 133,180.53 72,986.83 133,151.70 73,072.51 133,308.01 73,178.78 133,501.88
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 97,844 97,844 98,109.14 98,109.14 98,244.39 98,244.39 98,247.13 98,247.13 98,117.37 98,117.37 97,977.21 97,977.21 97,956.00 97,956.00 98,071.00 98,071.00 98,213.63 98,213.63
6 Asphalt Mixing Plant Unit/Jam 1,093,555 5,609,361 1,096,513.90 5,624,538.25 1,098,025.55 5,632,292.18 1,098,056.11 5,632,448.97 1,096,605.86 5,625,009.92 1,095,039.45 5,616,975.08 1,094,802.40 5,615,759.15 1,096,087.62 5,622,351.65 1,097,681.71 5,630,528.46
7 Asphalt Sprayer Unit/Jam 90,170 90,170 90,414.30 90,414.30 90,538.95 90,538.95 90,541.47 90,541.47 90,421.89 90,421.89 90,292.73 90,292.73 90,273.18 90,273.18 90,379.15 90,379.15 90,510.60 90,510.60
8 Asphalt Tanker Unit/Jam 422,074 489,000 423,215.89 490,323.06 423,799.33 490,999.02 423,811.13 491,012.69 423,251.38 490,364.18 422,646.81 489,663.74 422,555.31 489,557.74 423,051.36 490,132.45 423,666.62 490,845.26
9 Blending Equipment Unit/Jam 137,174 217,000 137,545.17 217,587.13 137,734.78 217,887.09 137,738.62 217,893.16 137,556.70 217,605.37 137,360.21 217,294.54 137,330.48 217,247.50 137,491.69 217,502.54 137,691.65 217,818.86
10 Bore Pile Machine Unit/Jam 377,948 657,000 378,970.60 658,777.61 379,493.04 659,685.80 379,503.60 659,704.16 379,002.37 658,832.86 378,461.00 657,891.77 378,379.08 657,749.36 378,823.27 658,521.51 379,374.20 659,479.22
11 Bore Pile Machine Dia 60 Unit/Jam 247,489 748,000 248,158.41 750,023.83 248,500.52 751,057.80 248,507.44 751,078.71 248,179.22 750,086.72 247,824.72 749,015.29 247,771.07 748,853.15 248,061.94 749,732.25 248,422.70 750,822.61
12 Bore Pile Machine Dia 80 Unit/Jam 978,444 978,444 981,091.39 981,091.39 982,443.91 982,443.91 982,471.26 982,471.26 981,173.66 981,173.66 979,772.14 979,772.14 979,560.04 979,560.04 980,709.98 980,709.98 982,136.26 982,136.26
13 Bulldozer 100-150 HP Unit/Jam 383,704 556,000 384,741.72 557,504.34 385,272.12 558,272.91 385,282.85 558,288.45 384,773.98 557,551.09 384,224.37 556,754.68 384,141.19 556,634.16 384,592.15 557,287.61 385,151.48 558,098.09
14 Cement Tanker Unit/Jam 356,844 460,000 357,809.80 461,244.60 358,303.07 461,880.47 358,313.05 461,893.32 357,839.81 461,283.28 357,328.66 460,624.38 357,251.31 460,524.66 357,670.70 461,065.29 358,190.87 461,735.83
15 Cold Milling Unit/Jam 557,329 1,186,000 558,837.35 1,189,208.90 559,607.76 1,190,848.33 559,623.33 1,190,881.48 558,884.21 1,189,308.63 558,085.90 1,187,609.81 557,965.08 1,187,352.72 558,620.09 1,188,746.59 559,432.52 1,190,475.43
16 Cold Recycler Unit/Jam 4,693,654 4,693,654 4,706,353.10 4,706,353.10 4,712,841.22 4,712,841.22 4,712,972.42 4,712,972.42 4,706,747.77 4,706,747.77 4,700,024.59 4,700,024.59 4,699,007.15 4,699,007.15 4,704,523.45 4,704,523.45 4,711,365.42 4,711,365.42
17 Compressor 4000-6500 L\M Unit/Jam 142,930 142,930 143,316.29 143,316.29 143,513.87 143,513.87 143,517.86 143,517.86 143,328.31 143,328.31 143,123.58 143,123.58 143,092.59 143,092.59 143,260.58 143,260.58 143,468.92 143,468.92
18 Concrete Breaker Unit/Jam 520,878 993,000 522,286.89 995,686.71 523,006.90 997,059.36 523,021.46 997,087.11 522,330.68 995,770.21 521,584.58 994,347.84 521,471.67 994,132.59 522,083.84 995,299.63 522,843.13 996,747.13
19 Concrete Mixer (350) Unit/Jam 96,885 96,885 97,147.28 97,147.28 97,281.21 97,281.21 97,283.92 97,283.92 97,155.43 97,155.43 97,016.65 97,016.65 96,995.65 96,995.65 97,109.52 97,109.52 97,250.75 97,250.75
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 110,315 110,315 110,613.24 110,613.24 110,765.73 110,765.73 110,768.82 110,768.82 110,622.52 110,622.52 110,464.51 110,464.51 110,440.59 110,440.59 110,570.24 110,570.24 110,731.05 110,731.05
21 Concrete Pan Mixer Unit/Jam 293,533 628,000 294,327.42 629,699.15 294,733.17 630,567.25 294,741.38 630,584.80 294,352.10 629,751.96 293,931.64 628,852.41 293,868.01 628,716.28 294,212.99 629,454.35 294,640.88 630,369.79
22 Concrete Pump Unit/Jam 223,507 240,000 224,112.05 240,649.36 224,421.01 240,981.11 224,427.26 240,987.82 224,130.85 240,669.54 223,810.69 240,325.76 223,762.25 240,273.74 224,024.93 240,555.80 224,350.73 240,905.65
23 Concrete Vibrator Unit/Jam 83,456 83,456 83,681.32 83,681.32 83,796.69 83,796.69 83,799.02 83,799.02 83,688.34 83,688.34 83,568.80 83,568.80 83,550.71 83,550.71 83,648.79 83,648.79 83,770.45 83,770.45
24 Crane 10-15 Ton Unit/Jam 299,289 299,289 300,098.54 300,098.54 300,512.25 300,512.25 300,520.62 300,520.62 300,123.71 300,123.71 299,695.01 299,695.01 299,630.13 299,630.13 299,981.88 299,981.88 300,418.15 300,418.15
25 Crane On Track 35 Ton Unit/Jam 248,448 472,000 249,120.26 473,277.07 249,463.70 473,929.52 249,470.64 473,942.72 249,141.16 473,316.76 248,785.28 472,640.66 248,731.42 472,538.35 249,023.42 473,093.08 249,385.58 473,781.11
26 Crane On Track 75-100 Ton Unit/Jam 390,418 592,000 391,474.70 593,601.75 392,014.38 594,420.08 392,025.30 594,436.63 391,507.53 593,651.53 390,948.29 592,803.55 390,863.66 592,675.22 391,322.51 593,370.98 391,891.63 594,233.94
27 Dump Truck 10 Ton Unit/Jam 369,315 397,000 370,313.91 398,074.14 370,824.42 398,622.92 370,834.74 398,634.02 370,344.96 398,107.53 369,815.95 397,538.86 369,735.90 397,452.81 370,169.94 397,919.39 370,708.30 398,498.10
28 Dump Truck 3-4 M3 Unit/Jam 201,444 264,000 201,989.40 264,714.29 202,267.86 265,079.22 202,273.49 265,086.60 202,006.34 264,736.49 201,717.79 264,358.34 201,674.13 264,301.11 201,910.88 264,611.38 202,204.52 264,996.22
29 Excavator 80-140 HP Unit/Jam 291,615 463,000 292,403.71 464,252.72 292,806.81 464,892.73 292,814.96 464,905.67 292,428.23 464,291.65 292,010.52 463,628.45 291,947.31 463,528.09 292,290.03 464,072.23 292,715.12 464,747.15
30 Flat Bed Truck 3-4 M3 Unit/Jam 353,967 473,000 354,924.24 474,279.77 355,413.53 474,933.61 355,423.43 474,946.83 354,954.00 474,319.55 354,446.98 473,642.02 354,370.25 473,539.49 354,786.26 474,095.39 355,302.24 474,784.89
31 Fulvi Mixer Unit/Jam 886,355 1,384,000 888,753.38 1,387,744.62 889,978.60 1,389,657.75 890,003.38 1,389,696.44 888,827.90 1,387,861.00 887,558.29 1,385,878.56 887,366.16 1,385,578.55 888,407.86 1,387,205.12 889,699.91 1,389,222.59
32 Generator Set Unit/Jam 394,255 418,000 395,322.12 419,130.96 395,867.10 419,708.77 395,878.12 419,720.46 395,355.27 419,166.11 394,790.54 418,567.37 394,705.08 418,476.76 395,168.43 418,968.02 395,743.14 419,577.34
33 Hot Recycler Unit/Jam 2,896,003 8,492,000 2,903,838.14 8,514,976.41 2,907,841.34 8,526,715.06 2,907,922.28 8,526,952.42 2,904,081.65 8,515,690.46 2,899,933.42 8,503,526.54 2,899,305.66 8,501,685.74 2,902,709.24 8,511,666.11 2,906,930.76 8,524,044.96
34 Jack Hammer Unit/Jam 54,678 54,678 54,825.70 54,825.70 54,901.28 54,901.28 54,902.81 54,902.81 54,830.29 54,830.29 54,751.97 54,751.97 54,740.12 54,740.12 54,804.38 54,804.38 54,884.09 54,884.09
35 Launching Gantry Unit/Jam 69,583,680 69,583,680 69,771,949.22 69,771,949.22 69,868,136.02 69,868,136.02 69,870,080.98 69,870,080.98 69,777,800.19 69,777,800.19 69,678,128.67 69,678,128.67 69,663,045.13 69,663,045.13 69,744,824.54 69,744,824.54 69,846,257.21 69,846,257.21
36 Motor Grader > 100 HP Unit/Jam 273,389 459,000 274,128.48 460,241.89 274,506.39 460,876.38 274,514.03 460,889.21 274,151.46 460,280.49 273,759.86 459,623.02 273,700.60 459,523.52 274,021.91 460,062.97 274,420.43 460,732.06
37 Pedestrian Roller Unit/Jam 90,170 90,170 90,414.30 90,414.30 90,538.95 90,538.95 90,541.47 90,541.47 90,421.89 90,421.89 90,292.73 90,292.73 90,273.18 90,273.18 90,379.15 90,379.15 90,510.60 90,510.60
38 Pile Driver + Hammer Unit/Jam 102,641 300,000 102,918.41 300,811.70 103,060.29 301,226.39 103,063.16 301,234.78 102,927.04 300,836.92 102,780.02 300,407.20 102,757.77 300,342.17 102,878.40 300,694.75 103,028.02 301,132.06
39 Rock Drill Breaker Unit/Jam 99,763 324,000 100,032.85 324,876.63 100,170.75 325,324.50 100,173.54 325,333.56 100,041.24 324,903.88 99,898.34 324,439.78 99,876.71 324,369.55 99,993.96 324,750.33 100,139.38 325,222.63
40 Split Form Paver Unit/Jam 211,037 211,037 211,607.95 211,607.95 211,899.67 211,899.67 211,905.57 211,905.57 211,625.69 211,625.69 211,323.40 211,323.40 211,277.66 211,277.66 211,525.68 211,525.68 211,833.31 211,833.31
41 Stone Crusher Unit/Jam 565,003 704,000 566,532.18 705,904.78 567,313.20 706,877.93 567,328.99 706,897.61 566,579.69 705,963.98 565,770.38 704,955.57 565,647.91 704,802.96 566,311.94 705,630.35 567,135.55 706,656.58
42 Tamper Unit/Jam 84,415 84,415 84,643.18 84,643.18 84,759.87 84,759.87 84,762.23 84,762.23 84,650.28 84,650.28 84,529.36 84,529.36 84,511.06 84,511.06 84,610.27 84,610.27 84,733.32 84,733.32
43 Tandem Roller 6-8 T Unit/Jam 407,685 476,000 408,788.08 477,287.89 409,351.63 477,945.87 409,363.02 477,959.18 408,822.36 477,327.92 408,238.39 476,646.09 408,150.02 476,542.91 408,629.16 477,102.34 409,223.44 477,796.21
44 Three Wheel Roller 6-8 T Unit/Jam 135,256 171,000 135,621.46 171,462.67 135,808.42 171,699.04 135,812.20 171,703.82 135,632.83 171,477.05 135,439.09 171,232.11 135,409.77 171,195.04 135,568.73 171,396.01 135,765.90 171,645.28
45 Tire Roller 8-10 T Unit/Jam 241,733 436,000 242,387.28 437,179.66 242,721.44 437,782.36 242,728.19 437,794.54 242,407.61 437,216.33 242,061.35 436,591.80 242,008.95 436,497.29 242,293.05 437,009.71 242,645.43 437,645.27
46 Track Loader 75-100 HP Unit/Jam 226,385 298,000 226,997.62 298,806.28 227,310.55 299,218.22 227,316.88 299,226.55 227,016.65 298,831.34 226,692.38 298,404.49 226,643.30 298,339.89 226,909.37 298,690.12 227,239.37 299,124.52
47 Trailer 20 Ton Unit/Jam 365,478 506,000 366,466.49 507,369.06 366,971.70 508,068.51 366,981.91 508,082.66 366,497.22 507,411.61 365,973.71 506,686.81 365,894.49 506,577.13 366,324.02 507,171.81 366,856.78 507,909.41
48 Trailler 15 Ton Unit/Jam 316,555 482,000 317,411.92 483,304.12 317,849.50 483,970.40 317,858.35 483,983.87 317,438.54 483,344.65 316,985.10 482,654.24 316,916.48 482,549.76 317,288.52 483,116.23 317,749.97 483,818.85
49 Truck Mixer (agitator) Unit/Jam 398,092 585,000 399,169.54 586,582.81 399,719.83 587,391.46 399,730.95 587,407.81 399,203.01 586,632.00 398,632.78 585,794.04 398,546.49 585,667.23 399,014.35 586,354.77 399,594.66 587,207.53
50 Vibrating Rammer Unit/Jam 81,537 81,537 81,757.62 81,757.62 81,870.33 81,870.33 81,872.60 81,872.60 81,764.47 81,764.47 81,647.68 81,647.68 81,630.00 81,630.00 81,725.83 81,725.83 81,844.69 81,844.69
51 Vibratory Roller 5-8 T Unit/Jam 196,648 422,000 197,180.13 423,141.79 197,451.96 423,725.12 197,457.46 423,736.92 197,196.67 423,177.27 196,914.99 422,572.80 196,872.36 422,481.32 197,103.48 422,977.28 197,390.13 423,592.44
52 Water Pump 70-100 MM Unit/Jam 61,393 61,393 61,558.68 61,558.68 61,643.54 61,643.54 61,645.26 61,645.26 61,563.84 61,563.84 61,475.90 61,475.90 61,462.59 61,462.59 61,534.74 61,534.74 61,624.24 61,624.24
53 Water Tanker 3000-4500 L Unit/Jam 222,548 222,548 223,150.20 223,150.20 223,457.83 223,457.83 223,464.05 223,464.05 223,168.91 223,168.91 222,850.13 222,850.13 222,801.89 222,801.89 223,063.45 223,063.45 223,387.86 223,387.86
54 Welding Set Unit/Jam 124,704 124,704 125,041.06 125,041.06 125,213.44 125,213.44 125,216.93 125,216.93 125,051.55 125,051.55 124,872.92 124,872.92 124,845.89 124,845.89 124,992.45 124,992.45 125,174.23 125,174.23
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 216,793 345,000 217,379.07 345,933.45 217,678.75 346,410.35 217,684.81 346,419.99 217,397.30 345,962.46 217,086.77 345,468.28 217,039.77 345,393.50 217,294.56 345,798.96 217,610.58 346,301.87
HARGA SATUAN DASAR BAHAN KABUPATEN SAMPANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
2 Agregat Pecah Mesin 20-30 mm M3 288,000 288,000 288,779.23 288,779.23 289,177.34 289,177.34 289,185.39 289,185.39 288,803.44 288,803.44 288,390.91 288,390.91 288,328.48 288,328.48 288,666.96 288,666.96 289,086.78 289,086.78
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 330,000 330,000 330,892.87 330,892.87 331,349.03 331,349.03 331,358.25 331,358.25 330,920.61 330,920.61 330,447.92 330,447.92 330,376.39 330,376.39 330,764.23 330,764.23 331,245.27 331,245.27
4 Bahan Agr. Base Kelas A M3 317,000 317,000 317,857.69 317,857.69 318,295.89 318,295.89 318,304.75 318,304.75 317,884.35 317,884.35 317,430.28 317,430.28 317,361.56 317,361.56 317,734.12 317,734.12 318,196.21 318,196.21
5 Bahan Agr. Base Kelas B M3 297,000 297,000 297,803.58 297,803.58 298,214.13 298,214.13 298,222.43 298,222.43 297,828.55 297,828.55 297,403.13 297,403.13 297,338.75 297,338.75 297,687.80 297,687.80 298,120.74 298,120.74
6 Bahan Agr. Base Kelas C M3 273,000 273,000 273,738.64 273,738.64 274,116.02 274,116.02 274,123.65 274,123.65 273,761.60 273,761.60 273,370.55 273,370.55 273,311.38 273,311.38 273,632.22 273,632.22 274,030.18 274,030.18
7 Bahan Agr. Base Kelas C2 M3 249,000 249,000 249,673.71 249,673.71 250,017.90 250,017.90 250,024.86 250,024.86 249,694.64 249,694.64 249,337.98 249,337.98 249,284.00 249,284.00 249,576.64 249,576.64 249,939.61 249,939.61
8 Bahan Agr. Base Kelas S M3 202,000 202,000 202,546.54 202,546.54 202,825.77 202,825.77 202,831.42 202,831.42 202,563.53 202,563.53 202,274.18 202,274.18 202,230.40 202,230.40 202,467.80 202,467.80 202,762.26 202,762.26
9 Bahan Pilihan M3 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
10 Bahan Tanah Timbunan M3 115,000 115,000 115,311.15 115,311.15 115,470.12 115,470.12 115,473.33 115,473.33 115,320.82 115,320.82 115,156.09 115,156.09 115,131.17 115,131.17 115,266.32 115,266.32 115,433.96 115,433.96
11 Batu Belah/Kerakal M3 325,000 325,000 325,879.34 325,879.34 326,328.59 326,328.59 326,337.67 326,337.67 325,906.67 325,906.67 325,441.14 325,441.14 325,370.69 325,370.69 325,752.65 325,752.65 326,226.40 326,226.40
12 Batu Kali M3 359,000 359,000 359,971.33 359,971.33 360,467.58 360,467.58 360,477.62 360,477.62 360,001.52 360,001.52 359,487.29 359,487.29 359,409.47 359,409.47 359,831.39 359,831.39 360,354.70 360,354.70
13 Chipping M3 214,000 214,000 214,579.01 214,579.01 214,874.83 214,874.83 214,880.81 214,880.81 214,597.00 214,597.00 214,290.47 214,290.47 214,244.08 214,244.08 214,495.59 214,495.59 214,807.54 214,807.54
14 Chipping (kg) Kg 266 266 266.72 266.72 267.09 267.09 267.09 267.09 266.74 266.74 266.36 266.36 266.30 266.30 266.62 266.62 267.00 267.00
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 383,000 383,000 384,036.27 384,036.27 384,565.69 384,565.69 384,576.40 384,576.40 384,068.47 384,068.47 383,519.86 383,519.86 383,436.84 383,436.84 383,886.97 383,886.97 384,445.27 384,445.27
18 Kapur M3 96,000 96,000 96,259.74 96,259.74 96,392.45 96,392.45 96,395.13 96,395.13 96,267.81 96,267.81 96,130.30 96,130.30 96,109.49 96,109.49 96,222.32 96,222.32 96,362.26 96,362.26
19 Pasir Beton (Kasar) M3 456,000 456,000 457,233.78 457,233.78 457,864.12 457,864.12 457,876.86 457,876.86 457,272.12 457,272.12 456,618.95 456,618.95 456,520.10 456,520.10 457,056.02 457,056.02 457,720.74 457,720.74
20 Pasir Halus (untuk HRS) M3 288,000 288,000 288,779.23 288,779.23 289,177.34 289,177.34 289,185.39 289,185.39 288,803.44 288,803.44 288,390.91 288,390.91 288,328.48 288,328.48 288,666.96 288,666.96 289,086.78 289,086.78
21 Pasir Pasang (Sedang) M3 322,000 322,000 322,871.22 322,871.22 323,316.33 323,316.33 323,325.33 323,325.33 322,898.30 322,898.30 322,437.06 322,437.06 322,367.26 322,367.26 322,745.70 322,745.70 323,215.08 323,215.08
22 Pasir Urug M3 196,000 196,000 196,530.31 196,530.31 196,801.24 196,801.24 196,806.72 196,806.72 196,546.79 196,546.79 196,266.04 196,266.04 196,223.55 196,223.55 196,453.90 196,453.90 196,739.62 196,739.62
23 Pasir Urug (ada unsur lempung) M3 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
24 Sirtu M3 149,000 149,000 149,403.14 149,403.14 149,609.11 149,609.11 149,613.27 149,613.27 149,415.67 149,415.67 149,202.24 149,202.24 149,169.95 149,169.95 149,345.06 149,345.06 149,562.26 149,562.26
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
26 Anti Pengelupas Liter 97,000 97,000 97,262.45 97,262.45 97,396.53 97,396.53 97,399.24 97,399.24 97,270.60 97,270.60 97,131.66 97,131.66 97,110.64 97,110.64 97,224.64 97,224.64 97,366.03 97,366.03
27 Arbocell Kg 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12 136,314.95 136,314.95 136,513.20 136,513.20
28 Asbuton Curah Kg 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09 150,347.38 150,347.38 150,566.03 150,566.03
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
40 Beton B-0 M3 565,963 565,963 567,494.04 567,494.04 568,276.38 568,276.38 568,292.20 568,292.20 567,541.63 567,541.63 566,730.94 566,730.94 566,608.26 566,608.26 567,273.42 567,273.42 568,098.43 568,098.43
41 Beton K-125 (fc' 10 MPa) M3 585,148 585,148 586,731.12 586,731.12 587,539.99 587,539.99 587,556.34 587,556.34 586,780.33 586,780.33 585,942.16 585,942.16 585,815.32 585,815.32 586,503.03 586,503.03 587,356.00 587,356.00
42 Beton K-175 (fc' 15 MPa) M3 633,111 633,111 634,823.84 634,823.84 635,699.00 635,699.00 635,716.70 635,716.70 634,877.07 634,877.07 633,970.21 633,970.21 633,832.97 633,832.97 634,577.04 634,577.04 635,499.93 635,499.93
43 Beton K-250 (fc' 20 MPa) M3 705,055 705,055 706,962.91 706,962.91 707,937.52 707,937.52 707,957.23 707,957.23 707,022.20 707,022.20 706,012.28 706,012.28 705,859.44 705,859.44 706,688.07 706,688.07 707,715.84 707,715.84
44 Beton K-300 (fc' 25 MPa) M3 733,833 733,833 735,818.54 735,818.54 736,832.93 736,832.93 736,853.44 736,853.44 735,880.25 735,880.25 734,829.10 734,829.10 734,670.03 734,670.03 735,532.48 735,532.48 736,602.20 736,602.20
45 Beton K-350 (fc' 30 MPa) M3 762,611 762,611 764,674.17 764,674.17 765,728.34 765,728.34 765,749.66 765,749.66 764,738.29 764,738.29 763,645.93 763,645.93 763,480.62 763,480.62 764,376.89 764,376.89 765,488.56 765,488.56
46 Beton K-400 (fc' 35 MPa) M3 791,389 791,389 793,529.80 793,529.80 794,623.75 794,623.75 794,645.87 794,645.87 793,596.34 793,596.34 792,462.76 792,462.76 792,291.21 792,291.21 793,221.30 793,221.30 794,374.92 794,374.92
47 Beton K-450 (fc' 40 MPa) M3 829,759 829,759 832,003.97 832,003.97 833,150.96 833,150.96 833,174.16 833,174.16 832,073.74 832,073.74 830,885.20 830,885.20 830,705.33 830,705.33 831,680.52 831,680.52 832,890.07 832,890.07
48 Beton K-500 (fc' 45 MPa) M3 863,333 863,333 865,668.87 865,668.87 866,862.27 866,862.27 866,886.40 866,886.40 865,741.47 865,741.47 864,504.83 864,504.83 864,317.69 864,317.69 865,332.33 865,332.33 866,590.82 866,590.82
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
51 Cat Anti Karat Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84 70,162.11 70,162.11 70,264.15 70,264.15
52 Cat Marka (Non Thermoplas) Kg 62,000 62,000 62,167.75 62,167.75 62,253.45 62,253.45 62,255.19 62,255.19 62,172.96 62,172.96 62,084.16 62,084.16 62,070.72 62,070.72 62,143.58 62,143.58 62,233.96 62,233.96
53 Cat Marka (Thermoplastic) Kg 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
54 Cerucuk Diameter 10-15 cm M' 24,000 24,000 24,064.94 24,064.94 24,098.11 24,098.11 24,098.78 24,098.78 24,066.95 24,066.95 24,032.58 24,032.58 24,027.37 24,027.37 24,055.58 24,055.58 24,090.57 24,090.57
55 Cold Mix (Aspal Dingin) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,252,000 1,252,000 1,255,387.48 1,255,387.48 1,257,118.14 1,257,118.14 1,257,153.14 1,257,153.14 1,255,492.75 1,255,492.75 1,253,699.39 1,253,699.39 1,253,428.00 1,253,428.00 1,254,899.43 1,254,899.43 1,256,724.48 1,256,724.48
57 Curing Compound Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75 48,111.16 48,111.16 48,181.13 48,181.13
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 585,000 585,000 586,582.81 586,582.81 587,391.46 587,391.46 587,407.81 587,407.81 586,632.00 586,632.00 585,794.04 585,794.04 585,667.23 585,667.23 586,354.77 586,354.77 587,207.53 587,207.53
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 681,000 681,000 682,842.55 682,842.55 683,783.91 683,783.91 683,802.94 683,802.94 682,899.81 682,899.81 681,924.35 681,924.35 681,776.73 681,776.73 682,577.09 682,577.09 683,569.79 683,569.79
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 863,000 863,000 865,334.98 865,334.98 866,527.92 866,527.92 866,552.04 866,552.04 865,407.54 865,407.54 864,171.39 864,171.39 863,984.31 863,984.31 864,998.57 864,998.57 866,256.57 866,256.57
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12 8,018.53 8,018.53 8,030.19 8,030.19
63 Minyak Pelumas/Olie Liter 47,000 47,000 47,127.17 47,127.17 47,192.13 47,192.13 47,193.45 47,193.45 47,131.12 47,131.12 47,063.80 47,063.80 47,053.61 47,053.61 47,108.84 47,108.84 47,177.36 47,177.36
64 Oxygen (Isi 6 M3) Botol 165,000 165,000 165,446.43 165,446.43 165,674.52 165,674.52 165,679.13 165,679.13 165,460.31 165,460.31 165,223.96 165,223.96 165,188.19 165,188.19 165,382.11 165,382.11 165,622.64 165,622.64
65 Polytene 125 Mikron Kg 26,000 26,000 26,070.35 26,070.35 26,106.29 26,106.29 26,107.01 26,107.01 26,072.53 26,072.53 26,035.29 26,035.29 26,029.65 26,029.65 26,060.21 26,060.21 26,098.11 26,098.11
66 Sand Sheet Ton 1,324,000 1,324,000 1,327,582.28 1,327,582.28 1,329,412.47 1,329,412.47 1,329,449.48 1,329,449.48 1,327,693.61 1,327,693.61 1,325,797.12 1,325,797.12 1,325,510.12 1,325,510.12 1,327,066.17 1,327,066.17 1,328,996.18 1,328,996.18
67 Seal Coat M2 106,000 106,000 106,286.80 106,286.80 106,433.33 106,433.33 106,436.29 106,436.29 106,295.71 106,295.71 106,143.88 106,143.88 106,120.90 106,120.90 106,245.48 106,245.48 106,400.00 106,400.00
68 Seal Guard Kg 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
69 Semen/PC (50 kg) Zak 69,000 69,000 69,186.69 69,186.69 69,282.07 69,282.07 69,284.00 69,284.00 69,192.49 69,192.49 69,093.66 69,093.66 69,078.70 69,078.70 69,159.79 69,159.79 69,260.37 69,260.37
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78 34,078.74 34,078.74 34,128.30 34,128.30
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25 16,037.05 16,037.05 16,060.38 16,060.38
75 Baja Prategang Kg 19,000 19,000 19,051.41 19,051.41 19,077.67 19,077.67 19,078.20 19,078.20 19,053.01 19,053.01 19,025.79 19,025.79 19,021.67 19,021.67 19,044.00 19,044.00 19,071.70 19,071.70
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
78 Baja Tulangan (Polos) U32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
81 Baja Tulangan (Ulir) D19 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
84 Baja Tulangan (Ulir) D36 Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,470,000 12,470,000 12,503,739.50 12,503,739.50 12,520,977.01 12,520,977.01 12,521,325.56 12,521,325.56 12,504,788.04 12,504,788.04 12,486,926.04 12,486,926.04 12,484,222.94 12,484,222.94 12,498,878.52 12,498,878.52 12,517,056.13 12,517,056.13
87 Box Culvert Type DUB 200×200 M' 13,238,000 13,238,000 13,273,817.44 13,273,817.44 13,292,116.57 13,292,116.57 13,292,486.59 13,292,486.59 13,274,930.56 13,274,930.56 13,255,968.48 13,255,968.48 13,253,098.90 13,253,098.90 13,268,657.08 13,268,657.08 13,287,954.22 13,287,954.22
88 Box Culvert Type uk 300×200 M' 14,293,000 14,293,000 14,331,671.90 14,331,671.90 14,351,429.38 14,351,429.38 14,351,828.89 14,351,828.89 14,332,873.74 14,332,873.74 14,312,400.47 14,312,400.47 14,309,302.20 14,309,302.20 14,326,100.29 14,326,100.29 14,346,935.31 14,346,935.31
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 186,000 186,000 186,503.25 186,503.25 186,760.36 186,760.36 186,765.56 186,765.56 186,518.89 186,518.89 186,252.47 186,252.47 186,212.15 186,212.15 186,430.75 186,430.75 186,701.88 186,701.88
91 Ducting (Strand Prestress) M' 162,000 162,000 162,438.32 162,438.32 162,662.25 162,662.25 162,666.78 162,666.78 162,451.94 162,451.94 162,219.89 162,219.89 162,184.77 162,184.77 162,375.17 162,375.17 162,611.31 162,611.31
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,087,000 2,087,000 2,092,646.70 2,092,646.70 2,095,531.60 2,095,531.60 2,095,589.93 2,095,589.93 2,092,822.18 2,092,822.18 2,089,832.77 2,089,832.77 2,089,380.37 2,089,380.37 2,091,833.16 2,091,833.16 2,094,875.39 2,094,875.39
94 Expansion Join Tipe Rubber M' 1,511,000 1,511,000 1,515,088.24 1,515,088.24 1,517,176.93 1,517,176.93 1,517,219.16 1,517,219.16 1,515,215.30 1,515,215.30 1,513,050.94 1,513,050.94 1,512,723.40 1,512,723.40 1,514,499.23 1,514,499.23 1,516,701.83 1,516,701.83
95 Expansion Join Tipe Torma M' 1,733,000 1,733,000 1,737,688.90 1,737,688.90 1,740,084.46 1,740,084.46 1,740,132.89 1,740,132.89 1,737,834.62 1,737,834.62 1,735,352.27 1,735,352.27 1,734,976.61 1,734,976.61 1,737,013.35 1,737,013.35 1,739,539.56 1,739,539.56
96 Expansion Tipe Joint Asphaltic Plug M' 2,057,000 2,057,000 2,062,565.53 2,062,565.53 2,065,408.96 2,065,408.96 2,065,466.45 2,065,466.45 2,062,738.49 2,062,738.49 2,059,792.05 2,059,792.05 2,059,346.16 2,059,346.16 2,061,763.68 2,061,763.68 2,064,762.19 2,064,762.19
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62 40,092.63 40,092.63 40,150.94 40,150.94
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
99 Glass Bead Kg 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
100 Joint Sealent Kg 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
101 Joint Socket Pile 16×16×16 Set 87,000 87,000 87,235.39 87,235.39 87,355.65 87,355.65 87,358.09 87,358.09 87,242.71 87,242.71 87,118.09 87,118.09 87,099.23 87,099.23 87,201.48 87,201.48 87,328.30 87,328.30
102 Joint Socket Pile 35×35 Set 750,000 750,000 752,029.24 752,029.24 753,065.98 753,065.98 753,086.94 753,086.94 752,092.30 752,092.30 751,018.01 751,018.01 750,855.43 750,855.43 751,736.88 751,736.88 752,830.16 752,830.16
103 Kawat Beton Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
104 Kawat Bronjong Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
105 Kawat Las Dos 173,000 173,000 173,468.08 173,468.08 173,707.22 173,707.22 173,712.05 173,712.05 173,482.62 173,482.62 173,234.82 173,234.82 173,197.32 173,197.32 173,400.64 173,400.64 173,652.82 173,652.82
106 Kayu Acuan (Kelas III/Meranti) M3 4,125,000 4,125,000 4,136,160.82 4,136,160.82 4,141,862.88 4,141,862.88 4,141,978.18 4,141,978.18 4,136,507.67 4,136,507.67 4,130,599.03 4,130,599.03 4,129,704.86 4,129,704.86 4,134,552.84 4,134,552.84 4,140,565.88 4,140,565.88
107 Kayu Perancah (Gelam) M3 2,657,000 2,657,000 2,664,188.92 2,664,188.92 2,667,861.74 2,667,861.74 2,667,936.01 2,667,936.01 2,664,412.34 2,664,412.34 2,660,606.45 2,660,606.45 2,660,030.50 2,660,030.50 2,663,153.19 2,663,153.19 2,667,026.31 2,667,026.31
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,000 53,000 53,143.40 53,143.40 53,216.66 53,216.66 53,218.14 53,218.14 53,147.86 53,147.86 53,071.94 53,071.94 53,060.45 53,060.45 53,122.74 53,122.74 53,200.00 53,200.00
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
110 Marmer Nama Jembatan Buah 576,000 576,000 577,558.46 577,558.46 578,354.67 578,354.67 578,370.77 578,370.77 577,606.89 577,606.89 576,781.83 576,781.83 576,656.97 576,656.97 577,333.92 577,333.92 578,173.56 578,173.56
111 Mata Kucing Buah 152,000 152,000 152,411.26 152,411.26 152,621.37 152,621.37 152,625.62 152,625.62 152,424.04 152,424.04 152,206.32 152,206.32 152,173.37 152,173.37 152,352.01 152,352.01 152,573.58 152,573.58
112 Matras Concrete (Tebal=10 cm) M2 141,000 141,000 141,381.50 141,381.50 141,576.40 141,576.40 141,580.35 141,580.35 141,393.35 141,393.35 141,191.39 141,191.39 141,160.82 141,160.82 141,326.53 141,326.53 141,532.07 141,532.07
113 Mini Pile 16×16×16 M' 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27 130,301.06 130,301.06 130,490.56 130,490.56
114 Mini Timber Pile Buah 31,000 31,000 31,083.88 31,083.88 31,126.73 31,126.73 31,127.59 31,127.59 31,086.48 31,086.48 31,042.08 31,042.08 31,035.36 31,035.36 31,071.79 31,071.79 31,116.98 31,116.98
115 Multipleks 12 mm Lbr 153,000 153,000 153,413.96 153,413.96 153,625.46 153,625.46 153,629.74 153,629.74 153,426.83 153,426.83 153,207.67 153,207.67 153,174.51 153,174.51 153,354.32 153,354.32 153,577.35 153,577.35
116 Paku Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81 20,046.32 20,046.32 20,075.47 20,075.47
117 Paving Block (Model Bata 8 cm) M2 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79 91,210.74 91,210.74 91,343.39 91,343.39
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 63,770,000 63,770,000 63,942,539.51 63,942,539.51 64,030,689.96 64,030,689.96 64,032,472.41 64,032,472.41 63,947,901.64 63,947,901.64 63,856,557.62 63,856,557.62 63,842,734.30 63,842,734.30 63,917,681.08 63,917,681.08 64,010,639.10 64,010,639.10
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 90,341,000 90,341,000 90,585,431.42 90,585,431.42 90,710,311.46 90,710,311.46 90,712,836.61 90,712,836.61 90,593,027.79 90,593,027.79 90,463,623.52 90,463,623.52 90,444,040.45 90,444,040.45 90,550,215.25 90,550,215.25 90,681,906.03 90,681,906.03
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 172,667,000 172,667,000 173,134,177.04 173,134,177.04 173,372,857.82 173,372,857.82 173,377,684.09 173,377,684.09 173,148,695.82 173,148,695.82 172,901,367.95 172,901,367.95 172,863,939.22 172,863,939.22 173,066,869.05 173,066,869.05 173,318,567.07 173,318,567.07
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 226,425,000 226,425,000 227,037,627.55 227,037,627.55 227,350,619.00 227,350,619.00 227,356,947.88 227,356,947.88 227,056,666.59 227,056,666.59 226,732,335.87 226,732,335.87 226,683,254.11 226,683,254.11 226,949,363.94 226,949,363.94 227,279,425.42 227,279,425.42
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 288,632,000 288,632,000 289,412,938.12 289,412,938.12 289,811,919.46 289,811,919.46 289,819,987.10 289,819,987.10 289,437,207.87 289,437,207.87 289,023,771.97 289,023,771.97 288,961,205.70 288,961,205.70 289,300,425.37 289,300,425.37 289,721,166.47 289,721,166.47
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 348,234,000 348,234,000 349,176,200.47 349,176,200.47 349,657,570.75 349,657,570.75 349,667,304.35 349,667,304.35 349,205,481.88 349,205,481.88 348,706,672.19 348,706,672.19 348,631,186.10 348,631,186.10 349,040,454.03 349,040,454.03 349,548,077.43 349,548,077.43
124 Pelat Rambu (Eng. Grade) Buah 201,000 201,000 201,543.84 201,543.84 201,821.68 201,821.68 201,827.30 201,827.30 201,560.74 201,560.74 201,272.83 201,272.83 201,229.26 201,229.26 201,465.48 201,465.48 201,758.48 201,758.48
125 Pelat Rambu (High L Grade) Buah 235,000 235,000 235,635.83 235,635.83 235,960.67 235,960.67 235,967.24 235,967.24 235,655.59 235,655.59 235,318.98 235,318.98 235,268.03 235,268.03 235,544.22 235,544.22 235,886.78 235,886.78
126 Pemantul Cahaya (Reflector) Buah 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97 14,032.42 14,032.42 14,052.83 14,052.83
127 Pipa Baja D10" Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09 22,050.95 22,050.95 22,083.02 22,083.02
128 Pipa Drainase Baja Dia 3" M' 264,000 264,000 264,714.29 264,714.29 265,079.22 265,079.22 265,086.60 265,086.60 264,736.49 264,736.49 264,358.34 264,358.34 264,301.11 264,301.11 264,611.38 264,611.38 264,996.22 264,996.22
129 Pipa Galvanis Dia 1,5" M' 105,000 105,000 105,284.09 105,284.09 105,429.24 105,429.24 105,432.17 105,432.17 105,292.92 105,292.92 105,142.52 105,142.52 105,119.76 105,119.76 105,243.16 105,243.16 105,396.22 105,396.22
130 Pipa Galvanis Dia 2" M' 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
131 Pipa Galvanis Dia 3" M' 231,000 231,000 231,625.01 231,625.01 231,944.32 231,944.32 231,950.78 231,950.78 231,644.43 231,644.43 231,313.55 231,313.55 231,263.47 231,263.47 231,534.96 231,534.96 231,871.69 231,871.69
132 Pipa Porus M' 43,000 43,000 43,116.34 43,116.34 43,175.78 43,175.78 43,176.98 43,176.98 43,119.96 43,119.96 43,058.37 43,058.37 43,049.04 43,049.04 43,099.58 43,099.58 43,162.26 43,162.26
133 Pipa PVC Dia 4" M' 250,000 250,000 250,676.41 250,676.41 251,021.99 251,021.99 251,028.98 251,028.98 250,697.43 250,697.43 250,339.34 250,339.34 250,285.14 250,285.14 250,578.96 250,578.96 250,943.39 250,943.39
134 Plastik Filter M2 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92 35,081.05 35,081.05 35,132.07 35,132.07
135 Rel Pengaman M' 163,000 163,000 163,441.02 163,441.02 163,666.34 163,666.34 163,670.90 163,670.90 163,454.73 163,454.73 163,221.25 163,221.25 163,185.91 163,185.91 163,377.48 163,377.48 163,615.09 163,615.09
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,970,000 1,970,000 1,975,330.14 1,975,330.14 1,978,053.30 1,978,053.30 1,978,108.37 1,978,108.37 1,975,495.79 1,975,495.79 1,972,673.96 1,972,673.96 1,972,246.93 1,972,246.93 1,974,562.20 1,974,562.20 1,977,433.89 1,977,433.89
137 Strip Bearing Buah 302,000 302,000 302,817.11 302,817.11 303,234.57 303,234.57 303,243.01 303,243.01 302,842.50 302,842.50 302,409.92 302,409.92 302,344.45 302,344.45 302,699.38 302,699.38 303,139.61 303,139.61
138 Tiang Pancang Baja Diameter 400 M' 698,000 698,000 699,888.55 699,888.55 700,853.40 700,853.40 700,872.91 700,872.91 699,947.24 699,947.24 698,947.42 698,947.42 698,796.12 698,796.12 699,616.46 699,616.46 700,633.94 700,633.94
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 853,000 853,000 855,307.92 855,307.92 856,487.04 856,487.04 856,510.88 856,510.88 855,379.65 855,379.65 854,157.81 854,157.81 853,972.91 853,972.91 854,975.41 854,975.41 856,218.84 856,218.84
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,784,000 1,784,000 1,788,826.89 1,788,826.89 1,791,292.94 1,791,292.94 1,791,342.81 1,791,342.81 1,788,976.89 1,788,976.89 1,786,421.50 1,786,421.50 1,786,034.78 1,786,034.78 1,788,131.46 1,788,131.46 1,790,732.01 1,790,732.01
HARGA SATUAN DASAR UPAH KABUPATEN SAMPANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 115,297.64
2 Tukang OH 129,537.30 129,537.30 129,406.39 129,406.39 129,218.14 129,218.14 129,147.12 129,147.12 129,256.51 129,256.51 129,442.06 129,442.06 129,531.34 129,531.34 129,333.87 129,333.87
3 Mandor OH 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 149,385.64
4 Operator OH 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 307,794.57
5 Pembantu Operator OH 192,799.71 192,799.71 192,604.85 192,604.85 192,324.68 192,324.68 192,218.97 192,218.97 192,381.78 192,381.78 192,657.95 192,657.95 192,790.83 192,790.83 192,496.93 192,496.93
6 Sopir OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70
7 Pembantu Sopir OH 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 125,323.52
8 Mekanik OH 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 173,447.75
9 Pembantu Mekanik OH 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 125,323.52
10 Kepala Tukang OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70
11 Pemasak Aspal OH 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 144,372.70

HARGA SATUAN DASAR ALAT KABUPATEN SAMPANG TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 453,692.79 507,103.40 453,234.26 506,590.89 452,574.96 505,853.97 452,326.20 505,575.93 452,709.33 506,004.16 453,359.20 506,730.54 453,671.91 507,080.06 452,980.30 921,531.38
2 Asphalt Distribution Unit/Jam 279,343.76 359,491.12 279,061.44 359,127.80 278,655.49 358,605.39 278,502.33 358,408.28 278,738.23 358,711.86 279,138.36 359,226.80 279,330.90 359,474.58 278,905.07 614,584.87
3 Asphalt Finisher Unit/Jam 205,173.17 973,036.03 204,965.81 972,052.62 204,667.66 970,638.60 204,555.16 970,105.10 204,728.42 970,926.79 205,022.31 972,320.57 205,163.73 972,991.24 204,850.96 1,159,284.56
4 Asphalt Liquid Mixer Unit/Jam 73,207.33 133,553.97 73,133.34 133,418.99 73,026.96 133,224.91 72,986.82 133,151.68 73,048.64 133,264.46 73,153.50 133,455.76 73,203.96 133,547.82 73,092.36 200,344.34
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 98,251.94 98,251.94 98,152.64 98,152.64 98,009.86 98,009.86 97,955.99 97,955.99 98,038.96 98,038.96 98,179.70 98,179.70 98,247.42 98,247.42 98,097.64 188,018.84
6 Asphalt Mixing Plant Unit/Jam 1,098,109.95 5,632,725.10 1,097,000.13 5,627,032.35 1,095,404.35 5,618,846.84 1,094,802.28 5,615,758.50 1,095,729.59 5,620,515.12 1,097,302.52 5,628,583.44 1,098,059.40 5,632,465.82 1,096,385.44 6,628,880.90
7 Asphalt Sprayer Unit/Jam 90,545.91 90,545.91 90,454.40 90,454.40 90,322.81 90,322.81 90,273.17 90,273.17 90,349.63 90,349.63 90,479.33 90,479.33 90,541.74 90,541.74 90,403.71 173,272.27
8 Asphalt Tanker Unit/Jam 423,831.91 491,036.76 423,403.56 490,540.49 422,787.64 489,826.91 422,555.26 489,557.68 422,913.17 489,972.34 423,520.27 490,675.71 423,812.40 491,014.16 423,166.31 878,160.98
9 Blending Equipment Unit/Jam 137,745.37 217,903.84 137,606.16 217,683.61 137,405.98 217,366.95 137,330.46 217,247.48 137,446.78 217,431.49 137,644.09 217,743.62 137,739.03 217,893.81 137,529.05 343,627.63
10 Bore Pile Machine Unit/Jam 379,522.21 659,736.50 379,138.64 659,069.74 378,587.12 658,111.00 378,379.03 657,749.28 378,699.52 658,306.40 379,243.15 659,251.41 379,504.74 659,706.13 378,926.19 1,006,043.10
11 Bore Pile Machine Dia 60 Unit/Jam 248,519.62 751,115.53 248,268.45 750,356.41 247,907.30 749,264.89 247,771.04 748,853.06 247,980.91 749,487.35 248,336.89 750,563.25 248,508.18 751,080.96 248,129.34 977,383.69
12 Bore Pile Machine Dia 80 Unit/Jam 982,519.42 982,519.42 981,526.43 981,526.43 980,098.63 980,098.63 979,559.93 979,559.93 980,389.63 980,389.63 981,796.99 981,796.99 982,474.20 982,474.20 980,976.44 1,880,188.42
13 Bulldozer 100-150 HP Unit/Jam 385,301.74 558,315.82 384,912.33 557,751.56 384,352.40 556,940.21 384,141.15 556,634.09 384,466.52 557,105.57 385,018.43 557,905.30 385,284.00 558,290.12 384,696.64 910,071.17
14 Cement Tanker Unit/Jam 358,330.61 461,915.97 357,968.46 461,449.13 357,447.74 460,777.87 357,251.27 460,524.61 357,553.86 460,914.68 358,067.14 461,576.33 358,314.12 461,894.71 357,767.88 789,138.46
15 Cold Milling Unit/Jam 559,650.77 1,190,939.87 559,085.15 1,189,736.24 558,271.87 1,188,005.56 557,965.02 1,187,352.58 558,437.62 1,188,358.28 559,239.27 1,190,064.19 559,625.01 1,190,885.05 558,771.88 1,701,267.77
16 Cold Recycler Unit/Jam 4,713,203.48 4,713,203.48 4,708,440.04 4,708,440.04 4,701,590.78 4,701,590.78 4,699,006.61 4,699,006.61 4,702,986.72 4,702,986.72 4,709,737.93 4,709,737.93 4,712,986.52 4,712,986.52 4,705,801.70 9,019,374.43
17 Compressor 4000-6500 L\M Unit/Jam 143,524.90 143,524.90 143,379.84 143,379.84 143,171.27 143,171.27 143,092.58 143,092.58 143,213.78 143,213.78 143,419.36 143,419.36 143,518.29 143,518.29 143,299.50 274,654.97
18 Concrete Breaker Unit/Jam 523,047.11 997,135.99 522,518.48 996,128.23 521,758.39 994,679.19 521,471.61 994,132.47 521,913.30 994,974.52 522,662.52 996,402.82 523,023.03 997,090.09 522,225.69 1,474,268.20
19 Concrete Mixer (350) Unit/Jam 97,288.69 97,288.69 97,190.36 97,190.36 97,048.98 97,048.98 96,995.64 96,995.64 97,077.80 97,077.80 97,217.15 97,217.15 97,284.21 97,284.21 97,135.90 186,175.52
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 110,774.25 110,774.25 110,662.29 110,662.29 110,501.32 110,501.32 110,440.58 110,440.58 110,534.12 110,534.12 110,692.80 110,692.80 110,769.15 110,769.15 110,600.29 211,982.03
21 Concrete Pan Mixer Unit/Jam 294,755.83 630,615.71 294,457.93 629,978.38 294,029.59 629,061.96 293,867.98 628,716.21 294,116.89 629,248.74 294,539.10 630,152.03 294,742.26 630,586.69 294,292.93 899,388.97
22 Concrete Pump Unit/Jam 224,438.26 240,999.64 224,211.43 240,756.07 223,885.28 240,405.85 223,762.22 240,273.71 223,951.75 240,477.22 224,273.23 240,822.43 224,427.93 240,988.54 224,085.80 446,029.39
23 Concrete Vibrator Unit/Jam 83,803.13 83,803.13 83,718.43 83,718.43 83,596.65 83,596.65 83,550.70 83,550.70 83,621.47 83,621.47 83,741.51 83,741.51 83,799.27 83,799.27 83,671.52 160,369.01
24 Crane 10-15 Ton Unit/Jam 300,535.35 300,535.35 300,231.62 300,231.62 299,794.88 299,794.88 299,630.10 299,630.10 299,883.89 299,883.89 300,314.37 300,314.37 300,521.52 300,521.52 300,063.38 575,116.46
25 Crane On Track 35 Ton Unit/Jam 249,482.87 473,965.95 249,230.73 473,486.93 248,868.18 472,798.16 248,731.39 472,538.30 248,942.07 472,938.54 249,299.43 473,617.45 249,471.39 473,944.13 249,091.08 701,550.93
26 Crane On Track 75-100 Ton Unit/Jam 392,044.52 594,465.77 391,648.29 593,864.97 391,078.57 593,001.09 390,863.62 592,675.15 391,194.69 593,177.15 391,756.25 594,028.67 392,026.47 594,438.40 391,428.84 952,335.41
27 Dump Truck 10 Ton Unit/Jam 370,852.92 398,653.56 370,478.11 398,250.66 369,939.19 397,671.34 369,735.86 397,452.76 370,049.03 397,789.41 370,580.24 398,360.44 370,835.85 398,635.21 370,270.52 737,435.95
28 Dump Truck 3-4 M3 Unit/Jam 202,283.41 265,099.60 202,078.97 264,831.67 201,785.01 264,446.43 201,674.10 264,301.08 201,844.92 264,524.95 202,134.67 264,904.68 202,274.10 265,087.40 201,965.74 449,815.16
29 Excavator 80-140 HP Unit/Jam 292,829.32 464,928.46 292,533.37 464,458.58 292,107.83 463,782.94 291,947.27 463,528.03 292,194.56 463,920.65 292,614.01 464,586.61 292,815.84 464,907.06 292,369.45 732,198.76
30 Flat Bed Truck 3-4 M3 Unit/Jam 355,440.85 474,970.12 355,081.62 474,490.08 354,565.09 473,799.85 354,370.21 473,539.44 354,670.37 473,940.53 355,179.50 474,620.88 355,424.49 474,948.25 354,882.65 799,527.36
31 Fulvi Mixer Unit/Jam 890,047.01 1,389,764.57 889,147.48 1,388,359.99 887,854.05 1,386,340.38 887,366.05 1,385,578.39 888,117.66 1,386,751.99 889,392.57 1,388,742.69 890,006.04 1,389,700.59 888,649.25 2,202,162.29
32 Generator Set Unit/Jam 395,897.53 419,741.03 395,497.42 419,316.82 394,922.10 418,706.85 394,705.03 418,476.71 395,039.35 418,831.17 395,606.44 419,432.40 395,879.31 419,721.71 395,275.80 781,411.39
33 Hot Recycler Unit/Jam 2,908,064.85 8,527,370.46 2,905,125.79 8,518,752.21 2,900,899.77 8,506,360.18 2,899,305.32 8,501,684.75 2,901,761.07 8,508,885.79 2,905,926.59 8,521,100.41 2,907,930.98 8,526,977.93 2,903,497.92 11,175,469.92
34 Jack Hammer Unit/Jam 54,905.50 54,905.50 54,850.01 54,850.01 54,770.22 54,770.22 54,740.11 54,740.11 54,786.48 54,786.48 54,865.13 54,865.13 54,902.97 54,902.97 54,819.27 105,069.35
35 Launching Gantry Unit/Jam 69,873,506.43 69,873,506.43 69,802,888.21 69,802,888.21 69,701,347.63 69,701,347.63 69,663,037.05 69,663,037.05 69,722,042.50 69,722,042.50 69,822,129.45 69,822,129.45 69,870,289.98 69,870,289.98 69,763,774.75 133,712,732.81
36 Motor Grader > 100 HP Unit/Jam 274,527.49 460,911.80 274,250.03 460,445.98 273,851.09 459,776.18 273,700.57 459,523.47 273,932.40 459,912.69 274,325.63 460,572.90 274,514.85 460,890.59 274,096.36 711,438.38
37 Pedestrian Roller Unit/Jam 90,545.91 90,545.91 90,454.40 90,454.40 90,322.81 90,322.81 90,273.17 90,273.17 90,349.63 90,349.63 90,479.33 90,479.33 90,541.74 90,541.74 90,403.71 173,272.27
38 Pile Driver + Hammer Unit/Jam 103,068.21 301,249.55 102,964.05 300,945.08 102,814.27 300,507.31 102,757.76 300,342.14 102,844.79 300,596.53 102,992.43 301,028.04 103,063.47 301,235.68 102,906.35 395,105.55
39 Rock Drill Breaker Unit/Jam 100,178.45 325,349.51 100,077.21 325,020.69 99,931.63 324,547.89 99,876.70 324,369.51 99,961.30 324,644.25 100,104.79 325,110.28 100,173.84 325,334.53 100,021.13 416,522.93
40 Split Form Paver Unit/Jam 211,915.95 211,915.95 211,701.78 211,701.78 211,393.82 211,393.82 211,277.63 211,277.63 211,456.59 211,456.59 211,760.14 211,760.14 211,906.20 211,906.20 211,583.15 405,530.83
41 Stone Crusher Unit/Jam 567,356.81 706,932.27 566,783.40 706,217.80 565,958.92 705,190.48 565,647.84 704,802.88 566,126.95 705,399.86 566,939.64 706,412.47 567,330.69 706,899.72 566,465.81 1,225,072.91
42 Tamper Unit/Jam 84,766.38 84,766.38 84,680.71 84,680.71 84,557.53 84,557.53 84,511.05 84,511.05 84,582.63 84,582.63 84,704.05 84,704.05 84,762.48 84,762.48 84,633.26 162,212.33
43 Tandem Roller 6-8 T Unit/Jam 409,383.09 477,982.61 408,969.35 477,499.53 408,374.43 476,804.93 408,149.97 476,542.86 408,495.68 476,946.49 409,082.08 477,631.16 409,364.25 477,960.61 408,740.18 851,903.63
44 Three Wheel Roller 6-8 T Unit/Jam 135,818.86 171,712.24 135,681.60 171,538.70 135,484.22 171,289.17 135,409.76 171,195.02 135,524.45 171,340.02 135,719.00 171,585.98 135,812.61 171,704.34 135,605.57 295,745.41
45 Tire Roller 8-10 T Unit/Jam 242,740.09 437,816.01 242,494.77 437,373.52 242,142.01 436,737.29 242,008.92 436,497.24 242,213.91 436,866.96 242,561.61 437,494.09 242,728.92 437,795.85 242,358.89 659,286.70
46 Track Loader 75-100 HP Unit/Jam 227,328.02 299,241.21 227,098.27 298,938.78 226,767.92 298,503.93 226,643.28 298,339.86 226,835.25 298,592.55 227,160.87 299,021.19 227,317.56 299,227.44 226,971.02 506,824.24
47 Trailer 20 Ton Unit/Jam 366,999.90 508,107.57 366,628.99 507,594.04 366,095.67 506,855.66 365,894.44 506,577.07 366,204.36 507,006.15 366,730.05 507,733.96 366,983.01 508,084.18 366,423.55 843,191.74
48 Trailler 15 Ton Unit/Jam 317,873.93 484,007.60 317,552.67 483,518.44 317,090.73 482,815.07 316,916.45 482,549.70 317,184.88 482,958.43 317,640.20 483,651.72 317,859.30 483,985.32 317,374.73 774,169.02
49 Truck Mixer (agitator) Unit/Jam 399,750.55 587,436.61 399,346.54 586,842.92 398,765.62 585,989.25 398,546.44 585,667.17 398,884.02 586,163.23 399,456.62 587,004.68 399,732.15 587,409.57 399,122.77 952,369.93
50 Vibrating Rammer Unit/Jam 81,876.62 81,876.62 81,793.87 81,793.87 81,674.89 81,674.89 81,629.99 81,629.99 81,699.14 81,699.14 81,816.42 81,816.42 81,872.85 81,872.85 81,748.04 156,682.37
51 Vibratory Roller 5-8 T Unit/Jam 197,467.14 423,757.69 197,267.57 423,329.42 196,980.61 422,713.61 196,872.34 422,481.27 197,039.09 422,839.12 197,321.94 423,446.11 197,458.05 423,738.19 197,157.03 603,816.19
52 Water Pump 70-100 MM Unit/Jam 61,648.28 61,648.28 61,585.97 61,585.97 61,496.38 61,496.38 61,462.58 61,462.58 61,514.64 61,514.64 61,602.95 61,602.95 61,645.44 61,645.44 61,551.46 117,972.61
53 Water Tanker 3000-4500 L Unit/Jam 223,475.01 223,475.01 223,249.15 223,249.15 222,924.39 222,924.39 222,801.87 222,801.87 222,990.58 222,990.58 223,310.69 223,310.69 223,464.72 223,464.72 223,124.05 427,650.70
54 Welding Set Unit/Jam 125,223.06 125,223.06 125,096.51 125,096.51 124,914.53 124,914.53 124,845.87 124,845.87 124,951.62 124,951.62 125,130.99 125,130.99 125,217.30 125,217.30 125,026.41 239,631.86
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 217,695.48 346,436.98 217,475.46 346,086.85 217,159.11 345,583.40 217,039.75 345,393.46 217,223.58 345,686.01 217,535.41 346,182.25 217,685.46 346,421.03 217,353.60 545,130.08
HARGA SATUAN DASAR BAHAN KABUPATEN SAMPANG TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
2 Agregat Pecah Mesin 20-30 mm M3 289,199.56 289,199.56 288,907.28 288,907.28 288,487.02 288,487.02 288,328.45 288,328.45 288,572.67 288,572.67 288,986.92 288,986.92 289,186.25 289,186.25 288,745.39 553,423.84
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 331,374.50 331,374.50 331,039.59 331,039.59 330,558.04 330,558.04 330,376.35 330,376.35 330,656.18 330,656.18 331,130.84 331,130.84 331,359.25 331,359.25 330,854.10 634,131.48
4 Bahan Agr. Base Kelas A M3 318,320.35 318,320.35 317,998.64 317,998.64 317,536.05 317,536.05 317,361.52 317,361.52 317,630.33 317,630.33 318,086.30 318,086.30 318,305.70 318,305.70 317,820.45 609,150.54
5 Bahan Agr. Base Kelas B M3 298,237.05 298,237.05 297,935.63 297,935.63 297,502.23 297,502.23 297,338.72 297,338.72 297,590.57 297,590.57 298,017.76 298,017.76 298,223.32 298,223.32 297,768.69 570,718.33
6 Bahan Agr. Base Kelas C M3 274,137.09 274,137.09 273,860.03 273,860.03 273,461.65 273,461.65 273,311.34 273,311.34 273,542.84 273,542.84 273,935.52 273,935.52 274,124.47 274,124.47 273,706.57 524,599.68
7 Bahan Agr. Base Kelas C2 M3 250,037.12 250,037.12 249,784.42 249,784.42 249,421.07 249,421.07 249,283.97 249,283.97 249,495.12 249,495.12 249,853.27 249,853.27 250,025.61 250,025.61 249,644.46 478,481.02
8 Bahan Agr. Base Kelas S M3 202,841.36 202,841.36 202,636.36 202,636.36 202,341.59 202,341.59 202,230.37 202,230.37 202,401.66 202,401.66 202,692.21 202,692.21 202,832.02 202,832.02 202,522.81 388,165.33
9 Bahan Pilihan M3 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
10 Bahan Tanah Timbunan M3 115,478.99 115,478.99 115,362.28 115,362.28 115,194.47 115,194.47 115,131.15 115,131.15 115,228.67 115,228.67 115,394.08 115,394.08 115,473.68 115,473.68 115,297.64 220,985.21
11 Batu Belah/Kerakal M3 326,353.67 326,353.67 326,023.84 326,023.84 325,549.58 325,549.58 325,370.65 325,370.65 325,646.24 325,646.24 326,113.71 326,113.71 326,338.65 326,338.65 325,841.16 624,523.43
12 Batu Kali M3 360,495.29 360,495.29 360,130.95 360,130.95 359,607.08 359,607.08 359,409.42 359,409.42 359,713.85 359,713.85 360,230.22 360,230.22 360,478.69 360,478.69 359,929.16 689,858.18
13 Chipping M3 214,891.34 214,891.34 214,674.16 214,674.16 214,361.88 214,361.88 214,244.06 214,244.06 214,425.52 214,425.52 214,733.34 214,733.34 214,881.45 214,881.45 214,553.87 411,224.66
14 Chipping (kg) Kg 267.11 267.11 266.84 266.84 266.45 266.45 266.30 266.30 266.53 266.53 266.91 266.91 267.10 267.10 266.69 511.15
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 384,595.25 384,595.25 384,206.56 384,206.56 383,647.66 383,647.66 383,436.79 383,436.79 383,761.57 383,761.57 384,312.47 384,312.47 384,577.55 384,577.55 383,991.27 735,976.84
18 Kapur M3 96,399.85 96,399.85 96,302.43 96,302.43 96,162.34 96,162.34 96,109.48 96,109.48 96,190.89 96,190.89 96,328.97 96,328.97 96,395.42 96,395.42 96,248.46 184,474.61
19 Pasir Beton (Kasar) M3 457,899.31 457,899.31 457,436.53 457,436.53 456,771.11 456,771.11 456,520.05 456,520.05 456,906.73 456,906.73 457,562.62 457,562.62 457,878.23 457,878.23 457,180.21 876,254.41
20 Pasir Halus (untuk HRS) M3 289,199.56 289,199.56 288,907.28 288,907.28 288,487.02 288,487.02 288,328.45 288,328.45 288,572.67 288,572.67 288,986.92 288,986.92 289,186.25 289,186.25 288,745.39 553,423.84
21 Pasir Pasang (Sedang) M3 323,341.18 323,341.18 323,014.39 323,014.39 322,544.51 322,544.51 322,367.23 322,367.23 322,640.28 322,640.28 323,103.43 323,103.43 323,326.29 323,326.29 322,833.39 618,758.59
22 Pasir Urug M3 196,816.37 196,816.37 196,617.46 196,617.46 196,331.44 196,331.44 196,223.53 196,223.53 196,389.73 196,389.73 196,671.65 196,671.65 196,807.31 196,807.31 196,507.28 376,635.67
23 Pasir Urug (ada unsur lempung) M3 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
24 Sirtu M3 149,620.61 149,620.61 149,469.39 149,469.39 149,251.96 149,251.96 149,169.93 149,169.93 149,296.28 149,296.28 149,510.59 149,510.59 149,613.72 149,613.72 149,385.64 286,319.97
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
26 Anti Pengelupas Liter 97,404.02 97,404.02 97,305.58 97,305.58 97,164.03 97,164.03 97,110.62 97,110.62 97,192.88 97,192.88 97,332.40 97,332.40 97,399.54 97,399.54 97,251.05 186,396.22
27 Arbocell Kg 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17 136,351.99 261,339.03
28 Asbuton Curah Kg 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
29 Aspal Emulsi (CRS-1/53 R-65) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
37 Assetilline Botol 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84 150,388.23 288,241.58
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
39 Bensin Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
40 Beton B-0 M3 568,320.06 568,320.06 567,745.68 567,745.68 566,919.80 566,919.80 566,608.19 566,608.19 567,088.12 567,088.12 567,902.18 567,902.18 568,293.90 568,293.90 567,427.55 1,087,559.97
41 Beton K-125 (fc' 10 MPa) M3 587,585.15 587,585.15 586,991.30 586,991.30 586,137.42 586,137.42 585,815.25 585,815.25 586,311.45 586,311.45 587,153.10 587,153.10 587,558.10 587,558.10 586,662.38 1,124,426.41
42 Beton K-175 (fc' 15 MPa) M3 635,747.86 635,747.86 635,105.34 635,105.34 634,181.47 634,181.47 633,832.90 633,832.90 634,369.76 634,369.76 635,280.41 635,280.41 635,718.60 635,718.60 634,749.46 1,216,592.50
43 Beton K-250 (fc' 20 MPa) M3 707,991.94 707,991.94 707,276.40 707,276.40 706,247.54 706,247.54 705,859.36 705,859.36 706,457.23 706,457.23 707,471.36 707,471.36 707,959.35 707,959.35 706,880.08 1,354,841.65
44 Beton K-300 (fc' 25 MPa) M3 736,889.57 736,889.57 736,144.83 736,144.83 735,073.97 735,073.97 734,669.95 734,669.95 735,292.22 735,292.22 736,347.74 736,347.74 736,855.65 736,855.65 735,732.33 1,410,141.31
45 Beton K-350 (fc' 30 MPa) M3 765,787.20 765,787.20 765,013.25 765,013.25 763,900.40 763,900.40 763,480.53 763,480.53 764,127.21 764,127.21 765,224.13 765,224.13 765,751.95 765,751.95 764,584.58 1,465,440.97
46 Beton K-400 (fc' 35 MPa) M3 794,684.83 794,684.83 793,881.67 793,881.67 792,726.83 792,726.83 792,291.12 792,291.12 792,962.20 792,962.20 794,100.51 794,100.51 794,648.25 794,648.25 793,436.83 1,520,740.63
47 Beton K-450 (fc' 40 MPa) M3 833,215.00 833,215.00 832,372.91 832,372.91 831,162.07 831,162.07 830,705.24 830,705.24 831,408.85 831,408.85 832,602.35 832,602.35 833,176.65 833,176.65 831,906.49 1,594,473.51
48 Beton K-500 (fc' 45 MPa) M3 866,928.90 866,928.90 866,052.74 866,052.74 864,792.91 864,792.91 864,317.59 864,317.59 865,049.67 865,049.67 866,291.46 866,291.46 866,889.00 866,889.00 865,567.45 1,658,989.78
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
51 Cat Anti Karat Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32 70,181.17 134,512.74
52 Cat Marka (Non Thermoplas) Kg 62,258.24 62,258.24 62,195.32 62,195.32 62,104.84 62,104.84 62,070.71 62,070.71 62,123.28 62,123.28 62,212.46 62,212.46 62,255.37 62,255.37 62,160.47 119,139.85
53 Cat Marka (Thermoplastic) Kg 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
54 Cerucuk Diameter 10-15 cm M' 24,099.96 24,099.96 24,075.61 24,075.61 24,040.58 24,040.58 24,027.37 24,027.37 24,047.72 24,047.72 24,082.24 24,082.24 24,098.85 24,098.85 24,062.12 46,118.65
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,257,214.77 1,257,214.77 1,255,944.15 1,255,944.15 1,254,117.16 1,254,117.16 1,253,427.85 1,253,427.85 1,254,489.52 1,254,489.52 1,256,290.36 1,256,290.36 1,257,156.90 1,257,156.90 1,255,240.40 2,405,856.40
57 Curing Compound Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71 48,124.23 92,237.31
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 587,436.61 587,436.61 586,842.92 586,842.92 585,989.25 585,989.25 585,667.17 585,667.17 586,163.23 586,163.23 587,004.68 587,004.68 587,409.57 587,409.57 586,514.08 1,124,142.17
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 683,836.47 683,836.47 683,145.34 683,145.34 682,151.59 682,151.59 681,776.65 681,776.65 682,354.12 682,354.12 683,333.65 683,333.65 683,804.99 683,804.99 682,762.55 1,308,616.78
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 866,594.53 866,594.53 865,718.69 865,718.69 864,459.35 864,459.35 863,984.21 863,984.21 864,716.02 864,716.02 865,957.33 865,957.33 866,554.63 866,554.63 865,233.60 1,658,349.90
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95 8,020.71 15,372.88
63 Minyak Pelumas/Olie Liter 47,195.76 47,195.76 47,148.06 47,148.06 47,079.48 47,079.48 47,053.60 47,053.60 47,093.46 47,093.46 47,161.06 47,161.06 47,193.59 47,193.59 47,121.64 90,315.70
64 Oxygen (Isi 6 M3) Botol 165,687.25 165,687.25 165,519.80 165,519.80 165,279.02 165,279.02 165,188.18 165,188.18 165,328.09 165,328.09 165,565.42 165,565.42 165,679.62 165,679.62 165,427.05 317,065.74
65 Polytene 125 Mikron Kg 26,108.29 26,108.29 26,081.91 26,081.91 26,043.97 26,043.97 26,029.65 26,029.65 26,051.70 26,051.70 26,089.10 26,089.10 26,107.09 26,107.09 26,067.29 49,961.87
66 Sand Sheet Ton 1,329,514.66 1,329,514.66 1,328,170.98 1,328,170.98 1,326,238.92 1,326,238.92 1,325,509.96 1,325,509.96 1,326,632.69 1,326,632.69 1,328,537.09 1,328,537.09 1,329,453.46 1,329,453.46 1,327,426.75 2,544,212.36
67 Seal Coat M2 106,441.51 106,441.51 106,333.93 106,333.93 106,179.25 106,179.25 106,120.89 106,120.89 106,210.77 106,210.77 106,363.24 106,363.24 106,436.61 106,436.61 106,274.35 203,690.72
68 Seal Guard Kg 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
69 Semen/PC (50 kg) Zak 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21 69,178.58 132,591.13
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
73 Thinner Liter 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04 34,088.00 65,334.76
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90 16,041.41 30,745.77
75 Baja Prategang Kg 19,079.14 19,079.14 19,059.86 19,059.86 19,032.13 19,032.13 19,021.67 19,021.67 19,037.78 19,037.78 19,065.11 19,065.11 19,078.26 19,078.26 19,049.18 36,510.60
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
81 Baja Tulangan (Ulir) D19 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,521,939.43 12,521,939.43 12,509,284.03 12,509,284.03 12,491,087.08 12,491,087.08 12,484,221.49 12,484,221.49 12,494,795.78 12,494,795.78 12,512,732.23 12,512,732.23 12,521,363.02 12,521,363.02 12,502,274.56 23,962,483.45
87 Box Culvert Type DUB 200×200 M' 13,293,138.27 13,293,138.27 13,279,703.45 13,279,703.45 13,260,385.79 13,260,385.79 13,253,097.36 13,253,097.36 13,264,322.90 13,264,322.90 13,283,364.01 13,283,364.01 13,292,526.35 13,292,526.35 13,272,262.28 25,438,280.35
88 Box Culvert Type uk 300×200 M' 14,352,532.50 14,352,532.50 14,338,027.00 14,338,027.00 14,317,169.82 14,317,169.82 14,309,300.54 14,309,300.54 14,321,420.70 14,321,420.70 14,341,979.29 14,341,979.29 14,351,871.82 14,351,871.82 14,329,992.81 27,465,579.47
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 186,774.72 186,774.72 186,585.95 186,585.95 186,314.53 186,314.53 186,212.12 186,212.12 186,369.85 186,369.85 186,637.39 186,637.39 186,766.12 186,766.12 186,481.40 357,419.56
91 Ducting (Strand Prestress) M' 162,674.75 162,674.75 162,510.35 162,510.35 162,273.95 162,273.95 162,184.75 162,184.75 162,322.13 162,322.13 162,555.14 162,555.14 162,667.27 162,667.27 162,419.28 311,300.91
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,095,692.67 2,095,692.67 2,093,574.64 2,093,574.64 2,090,529.17 2,090,529.17 2,089,380.13 2,089,380.13 2,091,149.86 2,091,149.86 2,094,151.74 2,094,151.74 2,095,596.20 2,095,596.20 2,092,401.52 4,010,401.20
94 Expansion Join Tipe Rubber M' 1,517,293.54 1,517,293.54 1,515,760.08 1,515,760.08 1,513,555.14 1,513,555.14 1,512,723.23 1,512,723.23 1,514,004.52 1,514,004.52 1,516,177.90 1,516,177.90 1,517,223.70 1,517,223.70 1,514,910.73 2,903,553.53
95 Expansion Join Tipe Torma M' 1,740,218.21 1,740,218.21 1,738,459.44 1,738,459.44 1,735,930.55 1,735,930.55 1,734,976.41 1,734,976.41 1,736,445.96 1,736,445.96 1,738,938.65 1,738,938.65 1,740,138.10 1,740,138.10 1,737,485.31 3,330,151.07
96 Expansion Tipe Joint Asphaltic Plug M' 2,065,567.72 2,065,567.72 2,063,480.13 2,063,480.13 2,060,478.44 2,060,478.44 2,059,345.92 2,059,345.92 2,061,090.21 2,061,090.21 2,064,048.93 2,064,048.93 2,065,472.63 2,065,472.63 2,062,323.88 3,952,752.88
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76 40,103.53 76,864.42
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
99 Glass Bead Kg 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
100 Joint Sealent Kg 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
101 Joint Socket Pile 16×16×16 Set 87,362.37 87,362.37 87,274.07 87,274.07 87,147.12 87,147.12 87,099.22 87,099.22 87,172.99 87,172.99 87,298.13 87,298.13 87,358.35 87,358.35 87,225.17 167,180.12
102 Joint Socket Pile 35×35 Set 753,123.86 753,123.86 752,362.71 752,362.71 751,268.27 751,268.27 750,855.34 750,855.34 751,491.33 751,491.33 752,570.10 752,570.10 753,089.20 753,089.20 751,941.13 1,441,207.91
103 Kawat Beton Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
104 Kawat Bronjong Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
105 Kawat Las Dos 173,720.57 173,720.57 173,545.00 173,545.00 173,292.55 173,292.55 173,197.30 173,197.30 173,344.00 173,344.00 173,592.84 173,592.84 173,712.57 173,712.57 173,447.75 332,438.62
106 Kayu Acuan (Kelas III/Meranti) M3 4,142,181.25 4,142,181.25 4,137,994.92 4,137,994.92 4,131,975.48 4,131,975.48 4,129,704.38 4,129,704.38 4,133,202.29 4,133,202.29 4,139,135.56 4,139,135.56 4,141,990.57 4,141,990.57 4,135,676.23 7,926,643.48
107 Kayu Perancah (Gelam) M3 2,668,066.81 2,668,066.81 2,665,370.30 2,665,370.30 2,661,493.05 2,661,493.05 2,660,030.19 2,660,030.19 2,662,283.27 2,662,283.27 2,666,105.01 2,666,105.01 2,667,943.99 2,667,943.99 2,663,876.78 5,105,719.21
108 Kerb Pracetak Type 1 (Peninggi) Buah 53,220.75 53,220.75 53,166.97 53,166.97 53,089.62 53,089.62 53,060.44 53,060.44 53,105.39 53,105.39 53,181.62 53,181.62 53,218.30 53,218.30 53,137.17 101,845.36
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
110 Marmer Nama Jembatan Buah 578,399.13 578,399.13 577,814.56 577,814.56 576,974.03 576,974.03 576,656.90 576,656.90 577,145.34 577,145.34 577,973.84 577,973.84 578,372.50 578,372.50 577,490.79 1,106,847.67
111 Mata Kucing Buah 152,633.10 152,633.10 152,478.84 152,478.84 152,257.04 152,257.04 152,173.35 152,173.35 152,302.24 152,302.24 152,520.87 152,520.87 152,626.08 152,626.08 152,393.40 292,084.80
112 Matras Concrete (Tebal=10 cm) M2 141,587.29 141,587.29 141,444.19 141,444.19 141,238.43 141,238.43 141,160.80 141,160.80 141,280.37 141,280.37 141,483.18 141,483.18 141,580.77 141,580.77 141,364.93 270,947.09
113 Mini Pile 16×16×16 M' 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46 130,336.46 249,809.37
114 Mini Timber Pile Buah 31,129.12 31,129.12 31,097.66 31,097.66 31,052.42 31,052.42 31,035.35 31,035.35 31,061.64 31,061.64 31,106.23 31,106.23 31,127.69 31,127.69 31,080.23 59,569.93
115 Multipleks 12 mm Lbr 153,637.27 153,637.27 153,481.99 153,481.99 153,258.73 153,258.73 153,174.49 153,174.49 153,304.23 153,304.23 153,524.30 153,524.30 153,630.20 153,630.20 153,395.99 294,006.41
116 Paku Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38 20,051.76 38,432.21
117 Paving Block (Model Bata 8 cm) M2 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82 91,235.52 174,866.56
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 64,035,611.67 64,035,611.67 63,970,893.56 63,970,893.56 63,877,836.65 63,877,836.65 63,842,726.89 63,842,726.89 63,896,802.47 63,896,802.47 63,988,527.21 63,988,527.21 64,032,663.95 64,032,663.95 63,935,048.01 122,541,104.22
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 90,717,283.89 90,717,283.89 90,625,599.74 90,625,599.74 90,493,768.86 90,493,768.86 90,444,029.95 90,444,029.95 90,520,637.17 90,520,637.17 90,650,580.78 90,650,580.78 90,713,107.96 90,713,107.96 90,574,818.45 173,600,217.92
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 173,386,184.09 173,386,184.09 173,210,949.96 173,210,949.96 172,958,984.17 172,958,984.17 172,863,919.15 172,863,919.15 173,010,337.03 173,010,337.03 173,258,695.74 173,258,695.74 173,378,202.71 173,378,202.71 173,113,892.66 331,798,727.34
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 227,368,094.27 227,368,094.27 227,138,302.89 227,138,302.89 226,807,890.27 226,807,890.27 226,683,227.80 226,683,227.80 226,875,231.30 226,875,231.30 227,200,913.80 227,200,913.80 227,357,627.97 227,357,627.97 227,011,027.85 435,100,666.83
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 289,834,195.81 289,834,195.81 289,541,272.56 289,541,272.56 289,120,083.85 289,120,083.85 288,961,172.16 288,961,172.16 289,205,925.85 289,205,925.85 289,621,084.92 289,621,084.92 289,820,854.05 289,820,854.05 289,379,030.55 554,638,293.77
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 349,684,447.12 349,684,447.12 349,331,035.75 349,331,035.75 348,822,872.30 348,822,872.30 348,631,145.63 348,631,145.63 348,926,440.52 348,926,440.52 349,427,329.21 349,427,329.21 349,668,350.31 349,668,350.31 349,135,291.04 669,170,125.26
124 Pelat Rambu (Eng. Grade) Buah 201,837.20 201,837.20 201,633.21 201,633.21 201,339.90 201,339.90 201,229.23 201,229.23 201,399.68 201,399.68 201,688.79 201,688.79 201,827.90 201,827.90 201,520.22 386,243.72
125 Pelat Rambu (High L Grade) Buah 235,978.81 235,978.81 235,740.32 235,740.32 235,397.39 235,397.39 235,268.01 235,268.01 235,467.28 235,467.28 235,805.30 235,805.30 235,967.95 235,967.95 235,608.22 451,578.48
126 Pemantul Cahaya (Reflector) Buah 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66 14,036.23 26,902.55
127 Pipa Baja D10" Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62 22,056.94 42,275.43
128 Pipa Drainase Baja Dia 3" M' 265,099.60 265,099.60 264,831.67 264,831.67 264,446.43 264,446.43 264,301.08 264,301.08 264,524.95 264,524.95 264,904.68 264,904.68 265,087.40 265,087.40 264,683.28 507,305.18
129 Pipa Galvanis Dia 1,5" M' 105,437.34 105,437.34 105,330.78 105,330.78 105,177.56 105,177.56 105,119.75 105,119.75 105,208.79 105,208.79 105,359.81 105,359.81 105,432.49 105,432.49 105,271.76 201,769.11
130 Pipa Galvanis Dia 2" M' 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
131 Pipa Galvanis Dia 3" M' 231,962.15 231,962.15 231,727.72 231,727.72 231,390.63 231,390.63 231,263.45 231,263.45 231,459.33 231,459.33 231,791.59 231,791.59 231,951.47 231,951.47 231,597.87 443,892.04
132 Pipa Porus M' 43,179.10 43,179.10 43,135.46 43,135.46 43,072.71 43,072.71 43,049.04 43,049.04 43,085.50 43,085.50 43,147.35 43,147.35 43,177.11 43,177.11 43,111.29 82,629.25
133 Pipa PVC Dia 4" M' 251,041.29 251,041.29 250,787.57 250,787.57 250,422.76 250,422.76 250,285.11 250,285.11 250,497.11 250,497.11 250,856.70 250,856.70 251,029.73 251,029.73 250,647.04 480,402.64
134 Plastik Filter M2 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16 35,090.59 67,256.37
135 Rel Pengaman M' 163,678.92 163,678.92 163,513.50 163,513.50 163,275.64 163,275.64 163,185.89 163,185.89 163,324.11 163,324.11 163,558.57 163,558.57 163,671.39 163,671.39 163,421.87 313,222.52
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,978,205.35 1,978,205.35 1,976,206.06 1,976,206.06 1,973,331.32 1,973,331.32 1,972,246.70 1,972,246.70 1,973,917.22 1,973,917.22 1,976,750.80 1,976,750.80 1,978,114.29 1,978,114.29 1,975,098.71 3,785,572.77
137 Strip Bearing Buah 303,257.88 303,257.88 302,951.39 302,951.39 302,510.69 302,510.69 302,344.42 302,344.42 302,600.51 302,600.51 303,034.89 303,034.89 303,243.92 303,243.92 302,781.63 580,326.38
138 Tiang Pancang Baja Diameter 400 M' 700,907.28 700,907.28 700,198.90 700,198.90 699,180.34 699,180.34 698,796.04 698,796.04 699,387.93 699,387.93 700,391.91 700,391.91 700,875.01 700,875.01 699,806.55 1,341,284.16
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 856,552.87 856,552.87 855,687.19 855,687.19 854,442.44 854,442.44 853,972.81 853,972.81 854,696.13 854,696.13 855,923.06 855,923.06 856,513.44 856,513.44 855,207.71 1,639,133.79
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,791,430.63 1,791,430.63 1,789,620.11 1,789,620.11 1,787,016.79 1,787,016.79 1,786,034.57 1,786,034.57 1,787,547.37 1,787,547.37 1,790,113.42 1,790,113.42 1,791,348.17 1,791,348.17 1,788,617.31 3,428,153.21
HARGA SATUAN DASAR UPAH KABUPATEN PAMEKASAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 111,000 111,000 111,300.33 111,300.33 111,453.76 111,453.76 111,456.87 111,456.87 111,309.66 111,309.66 111,150.66 111,150.66 111,126.60 111,126.60 111,257.06 111,257.06 111,418.86 111,418.86
2 Tukang OH 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
3 Mandor OH 143,000 143,000 143,386.91 143,386.91 143,584.58 143,584.58 143,588.58 143,588.58 143,398.93 143,398.93 143,194.10 143,194.10 143,163.10 143,163.10 143,331.17 143,331.17 143,539.62 143,539.62
4 Operator OH 296,000 296,000 296,800.87 296,800.87 297,210.04 297,210.04 297,218.31 297,218.31 296,825.76 296,825.76 296,401.77 296,401.77 296,337.61 296,337.61 296,685.49 296,685.49 297,116.97 297,116.97
5 Pembantu Operator OH 185,000 185,000 185,500.55 185,500.55 185,756.27 185,756.27 185,761.45 185,761.45 185,516.10 185,516.10 185,251.11 185,251.11 185,211.01 185,211.01 185,428.43 185,428.43 185,698.11 185,698.11
6 Sopir OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
7 Pembantu Sopir OH 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
8 Mekanik OH 166,000 166,000 166,449.14 166,449.14 166,678.60 166,678.60 166,683.24 166,683.24 166,463.10 166,463.10 166,225.32 166,225.32 166,189.34 166,189.34 166,384.43 166,384.43 166,626.41 166,626.41
9 Pembantu Mekanik OH 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87 120,277.90 120,277.90 120,452.83 120,452.83
10 Kepala Tukang OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52
11 Pemasak Aspal OH 139,000 139,000 139,376.09 139,376.09 139,568.23 139,568.23 139,572.11 139,572.11 139,387.77 139,387.77 139,188.67 139,188.67 139,158.54 139,158.54 139,321.90 139,321.90 139,524.52 139,524.52

HARGA SATUAN DASAR ALAT KABUPATEN PAMEKASAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 435,081 486,000 436,257.94 487,314.95 436,859.36 487,986.75 436,871.52 488,000.34 436,294.53 487,355.81 435,671.32 486,659.67 435,577.01 486,554.32 436,088.34 487,125.50 436,722.56 487,833.94
2 Asphalt Distribution Unit/Jam 267,884 345,000 268,608.92 345,933.45 268,979.23 346,410.35 268,986.71 346,419.99 268,631.45 345,962.46 268,247.73 345,468.28 268,189.66 345,393.50 268,504.50 345,798.96 268,895.00 346,301.87
3 Asphalt Finisher Unit/Jam 196,756 933,000 197,288.62 935,524.37 197,560.60 936,814.08 197,566.10 936,840.16 197,305.17 935,602.83 197,023.34 934,266.40 196,980.68 934,064.15 197,211.93 935,160.68 197,498.74 936,520.72
4 Asphalt Liquid Mixer Unit/Jam 70,204 128,000 70,394.06 128,346.32 70,491.11 128,523.26 70,493.07 128,526.84 70,399.97 128,357.09 70,299.41 128,173.74 70,284.19 128,145.99 70,366.70 128,296.43 70,469.03 128,483.01
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 94,221 94,221 94,476.24 94,476.24 94,606.49 94,606.49 94,609.12 94,609.12 94,484.17 94,484.17 94,349.20 94,349.20 94,328.78 94,328.78 94,439.51 94,439.51 94,576.86 94,576.86
6 Asphalt Mixing Plant Unit/Jam 1,053,062 5,863,953 1,055,910.95 5,879,818.82 1,057,366.61 5,887,924.67 1,057,396.05 5,888,088.58 1,055,999.49 5,880,311.90 1,054,491.09 5,871,912.38 1,054,262.82 5,870,641.26 1,055,500.45 5,877,532.97 1,057,035.50 5,886,080.90
7 Asphalt Sprayer Unit/Jam 86,831 87,111 87,066.34 87,346.69 87,186.37 87,467.11 87,188.80 87,469.54 87,073.64 87,354.02 86,949.27 87,229.24 86,930.44 87,210.36 87,032.49 87,312.74 87,159.07 87,439.72
8 Asphalt Tanker Unit/Jam 406,445 471,000 407,544.58 472,274.36 408,106.41 472,925.43 408,117.77 472,938.60 407,578.75 472,313.97 406,996.56 471,639.31 406,908.46 471,537.21 407,386.14 472,090.76 407,978.62 472,777.34
9 Blending Equipment Unit/Jam 132,095 209,000 132,451.99 209,565.48 132,634.58 209,854.39 132,638.28 209,860.23 132,463.09 209,583.06 132,273.88 209,283.68 132,245.25 209,238.38 132,400.49 209,484.01 132,593.05 209,788.67
10 Bore Pile Machine Unit/Jam 363,953 633,000 364,937.64 634,712.68 365,440.74 635,587.69 365,450.91 635,605.38 364,968.25 634,765.90 364,446.92 633,859.20 364,368.03 633,721.98 364,795.77 634,465.93 365,326.31 635,388.66
11 Bore Pile Machine Dia 60 Unit/Jam 238,324 721,000 238,969.32 722,950.78 239,298.76 723,947.43 239,305.42 723,967.58 238,989.36 723,011.40 238,647.98 721,978.64 238,596.32 721,822.35 238,876.42 722,669.72 239,223.82 723,720.73
12 Bore Pile Machine Dia 80 Unit/Jam 942,213 942,213 944,762.43 944,762.43 946,064.86 946,064.86 946,091.20 946,091.20 944,841.65 944,841.65 943,492.03 943,492.03 943,287.79 943,287.79 944,395.14 944,395.14 945,768.61 945,768.61
13 Bulldozer 100-150 HP Unit/Jam 369,495 536,000 370,495.07 537,450.23 371,005.83 538,191.15 371,016.16 538,206.13 370,526.14 537,495.30 369,996.87 536,727.53 369,916.78 536,611.35 370,351.03 537,241.29 370,889.65 538,022.62
14 Cement Tanker Unit/Jam 343,631 443,000 344,560.41 444,198.60 345,035.42 444,810.97 345,045.03 444,823.35 344,589.31 444,235.85 344,097.09 443,601.30 344,022.60 443,505.27 344,426.46 444,025.92 344,927.37 444,671.68
15 Cold Milling Unit/Jam 536,692 1,398,927 538,144.09 1,402,712.01 538,885.97 1,404,645.77 538,900.97 1,404,684.88 538,189.22 1,402,829.64 537,420.46 1,400,825.82 537,304.12 1,400,522.58 537,934.88 1,402,166.69 538,717.22 1,404,205.92
16 Cold Recycler Unit/Jam 4,519,852 4,519,852 4,532,080.93 4,532,080.93 4,538,328.80 4,538,328.80 4,538,455.14 4,538,455.14 4,532,460.98 4,532,460.98 4,525,986.75 4,525,986.75 4,525,006.99 4,525,006.99 4,530,319.03 4,530,319.03 4,536,907.65 4,536,907.65
17 Compressor 4000-6500 L\M Unit/Jam 137,637 160,400 138,009.41 160,833.99 138,199.67 161,055.71 138,203.52 161,060.19 138,020.99 160,847.47 137,823.84 160,617.72 137,794.00 160,582.95 137,955.76 160,771.46 138,156.39 161,005.28
18 Concrete Breaker Unit/Jam 501,590 955,000 502,947.06 957,583.90 503,640.41 958,904.01 503,654.43 958,930.71 502,989.23 957,664.20 502,270.76 956,296.26 502,162.03 956,089.25 502,751.53 957,211.63 503,482.70 958,603.74
19 Concrete Mixer (350) Unit/Jam 93,298 93,298 93,550.00 93,550.00 93,678.97 93,678.97 93,681.58 93,681.58 93,557.85 93,557.85 93,424.21 93,424.21 93,403.99 93,403.99 93,513.64 93,513.64 93,649.64 93,649.64
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 106,230 106,230 106,517.33 106,517.33 106,664.18 106,664.18 106,667.15 106,667.15 106,526.26 106,526.26 106,374.10 106,374.10 106,351.07 106,351.07 106,475.92 106,475.92 106,630.77 106,630.77
21 Concrete Pan Mixer Unit/Jam 282,664 605,000 283,428.73 606,636.92 283,819.46 607,473.22 283,827.36 607,490.13 283,452.50 606,687.79 283,047.61 605,821.19 282,986.34 605,690.05 283,318.54 606,401.08 283,730.58 607,283.00
22 Concrete Pump Unit/Jam 215,231 247,372 215,813.38 248,041.30 216,110.90 248,383.25 216,116.91 248,390.16 215,831.48 248,062.10 215,523.18 247,707.77 215,476.52 247,654.15 215,729.48 247,944.87 216,043.22 248,305.47
23 Concrete Vibrator Unit/Jam 80,365 80,365 80,582.68 80,582.68 80,693.77 80,693.77 80,696.01 80,696.01 80,589.43 80,589.43 80,474.32 80,474.32 80,456.90 80,456.90 80,551.35 80,551.35 80,668.50 80,668.50
24 Crane 10-15 Ton Unit/Jam 288,206 387,612 288,986.15 388,660.74 289,384.55 389,196.55 289,392.60 389,207.38 289,010.39 388,693.34 288,597.56 388,138.12 288,535.09 388,054.10 288,873.81 388,509.65 289,293.93 389,074.67
25 Crane On Track 35 Ton Unit/Jam 239,248 454,000 239,895.56 455,228.37 240,226.27 455,855.94 240,232.96 455,868.63 239,915.67 455,266.54 239,572.98 454,616.23 239,521.11 454,517.82 239,802.29 455,051.39 240,151.05 455,713.19
26 Crane On Track 75-100 Ton Unit/Jam 375,962 569,000 376,978.73 570,539.52 377,498.43 571,326.06 377,508.94 571,341.96 377,010.35 570,587.36 376,471.82 569,772.33 376,390.32 569,648.99 376,832.18 570,317.71 377,380.22 571,147.15
27 Dump Truck 10 Ton Unit/Jam 355,639 382,000 356,601.50 383,033.56 357,093.11 383,561.61 357,103.05 383,572.28 356,631.41 383,065.68 356,121.99 382,518.50 356,044.90 382,435.70 356,462.87 382,884.65 356,981.29 383,441.50
28 Dump Truck 3-4 M3 Unit/Jam 193,985 263,802 194,509.91 264,515.76 194,778.06 264,880.42 194,783.48 264,887.79 194,526.22 264,537.94 194,248.36 264,160.07 194,206.31 264,102.89 194,434.29 264,412.92 194,717.07 264,797.47
29 Excavator 80-140 HP Unit/Jam 280,816 457,318 281,576.25 458,555.34 281,964.43 459,187.50 281,972.28 459,200.29 281,599.86 458,593.80 281,197.62 457,938.74 281,136.75 457,839.60 281,466.79 458,377.08 281,876.13 459,043.71
30 Flat Bed Truck 3-4 M3 Unit/Jam 340,859 455,000 341,781.70 456,231.07 342,252.88 456,860.03 342,262.40 456,872.74 341,810.36 456,269.33 341,322.12 455,617.59 341,248.23 455,518.96 341,648.83 456,053.71 342,145.70 456,716.96
31 Fulvi Mixer Unit/Jam 853,534 1,332,000 855,843.61 1,335,603.93 857,023.46 1,337,445.18 857,047.32 1,337,482.41 855,915.38 1,335,715.93 854,692.78 1,333,807.98 854,507.76 1,333,519.24 855,510.89 1,335,084.70 856,755.09 1,337,026.36
32 Generator Set Unit/Jam 379,656 548,839 380,683.68 550,323.97 381,208.49 551,082.64 381,219.10 551,097.98 380,715.61 550,370.12 380,171.79 549,583.96 380,089.49 549,464.99 380,535.69 550,110.02 381,089.12 550,910.07
33 Hot Recycler Unit/Jam 2,788,766 8,171,000 2,796,311.53 8,193,107.89 2,800,166.49 8,204,402.82 2,800,244.44 8,204,631.21 2,796,546.03 8,193,794.96 2,792,551.40 8,182,090.83 2,791,946.89 8,180,319.62 2,795,224.43 8,189,922.72 2,799,289.64 8,201,833.65
34 Jack Hammer Unit/Jam 52,653 52,653 52,795.55 52,795.55 52,868.33 52,868.33 52,869.80 52,869.80 52,799.97 52,799.97 52,724.55 52,724.55 52,713.14 52,713.14 52,775.02 52,775.02 52,851.78 52,851.78
35 Launching Gantry Unit/Jam 67,007,057 67,007,057 67,188,354.47 67,188,354.47 67,280,979.56 67,280,979.56 67,282,852.50 67,282,852.50 67,193,988.79 67,193,988.79 67,098,008.01 67,098,008.01 67,083,483.01 67,083,483.01 67,162,234.19 67,162,234.19 67,259,910.90 67,259,910.90
36 Motor Grader > 100 HP Unit/Jam 263,265 530,378 263,977.74 531,813.02 264,341.65 532,546.17 264,349.01 532,561.00 263,999.87 531,857.62 263,622.77 531,097.90 263,565.70 530,982.93 263,875.11 531,606.27 264,258.88 532,379.41
37 Pedestrian Roller Unit/Jam 86,831 86,831 87,066.34 87,066.34 87,186.37 87,186.37 87,188.80 87,188.80 87,073.64 87,073.64 86,949.27 86,949.27 86,930.44 86,930.44 87,032.49 87,032.49 87,159.07 87,159.07
38 Pile Driver + Hammer Unit/Jam 98,840 289,000 99,107.43 289,781.93 99,244.06 290,181.42 99,246.82 290,189.50 99,115.74 289,806.23 98,974.16 289,392.27 98,952.74 289,329.63 99,068.90 289,669.28 99,212.98 290,090.56
39 Rock Drill Breaker Unit/Jam 96,069 312,000 96,328.72 312,844.16 96,461.52 313,275.45 96,464.20 313,284.17 96,336.80 312,870.40 96,199.19 312,423.49 96,178.36 312,355.86 96,291.27 312,722.54 96,431.31 313,177.35
40 Split Form Paver Unit/Jam 203,222 203,222 203,772.29 203,772.29 204,053.21 204,053.21 204,058.89 204,058.89 203,789.38 203,789.38 203,498.28 203,498.28 203,454.23 203,454.23 203,693.07 203,693.07 203,989.31 203,989.31
41 Stone Crusher Unit/Jam 544,082 727,239 545,553.99 729,206.66 546,306.08 730,211.93 546,321.29 730,232.26 545,599.74 729,267.81 544,820.40 728,226.11 544,702.46 728,068.47 545,341.90 728,923.17 546,135.01 729,983.27
42 Tamper Unit/Jam 81,289 81,289 81,508.92 81,508.92 81,621.28 81,621.28 81,623.55 81,623.55 81,515.75 81,515.75 81,399.31 81,399.31 81,381.69 81,381.69 81,477.23 81,477.23 81,595.72 81,595.72
43 Tandem Roller 6-8 T Unit/Jam 392,589 458,000 393,651.01 459,239.19 394,193.69 459,872.29 394,204.67 459,885.09 393,684.02 459,277.70 393,121.68 458,621.66 393,036.58 458,522.38 393,497.97 459,060.65 394,070.25 459,728.28
44 Three Wheel Roller 6-8 T Unit/Jam 130,247 192,804 130,599.51 193,325.66 130,779.55 193,592.18 130,783.20 193,597.57 130,610.46 193,341.87 130,423.90 193,065.70 130,395.66 193,023.91 130,548.74 193,250.50 130,738.60 193,531.55
45 Tire Roller 8-10 T Unit/Jam 232,782 420,000 233,411.89 421,136.37 233,733.67 421,716.95 233,740.18 421,728.69 233,431.47 421,171.69 233,098.03 420,570.08 233,047.57 420,479.04 233,321.15 420,972.65 233,660.48 421,584.89
46 Track Loader 75-100 HP Unit/Jam 218,002 423,698 218,592.09 424,844.38 218,893.44 425,430.07 218,899.53 425,441.91 218,610.42 424,880.01 218,298.16 424,273.10 218,250.90 424,181.26 218,507.11 424,679.22 218,824.89 425,296.84
47 Trailer 20 Ton Unit/Jam 351,944 486,000 352,896.55 487,314.95 353,383.05 487,986.75 353,392.89 488,000.34 352,926.15 487,355.81 352,422.02 486,659.67 352,345.73 486,554.32 352,759.36 487,125.50 353,272.39 487,833.94
48 Trailler 15 Ton Unit/Jam 304,834 463,000 305,658.43 464,252.72 306,079.81 464,892.73 306,088.33 464,905.67 305,684.06 464,291.65 305,247.42 463,628.45 305,181.34 463,528.09 305,539.60 464,072.23 305,983.96 464,747.15
49 Truck Mixer (agitator) Unit/Jam 383,351 563,000 384,388.63 564,523.28 384,918.55 565,301.53 384,929.26 565,317.26 384,420.87 564,570.62 383,871.76 563,764.18 383,788.66 563,642.14 384,239.20 564,303.82 384,798.01 565,124.51
50 Vibrating Rammer Unit/Jam 78,518 78,518 78,730.20 78,730.20 78,838.74 78,838.74 78,840.93 78,840.93 78,736.80 78,736.80 78,624.34 78,624.34 78,607.32 78,607.32 78,699.59 78,699.59 78,814.05 78,814.05
51 Vibratory Roller 5-8 T Unit/Jam 189,366 406,000 189,878.72 407,098.50 190,140.49 407,659.72 190,145.78 407,671.06 189,894.65 407,132.63 189,623.40 406,551.08 189,582.35 406,463.07 189,804.91 406,940.23 190,080.95 407,532.06
52 Water Pump 70-100 MM Unit/Jam 59,119 59,119 59,279.21 59,279.21 59,360.93 59,360.93 59,362.59 59,362.59 59,284.18 59,284.18 59,199.50 59,199.50 59,186.68 59,186.68 59,256.17 59,256.17 59,342.34 59,342.34
53 Water Tanker 3000-4500 L Unit/Jam 214,307 230,400 214,887.14 231,023.38 215,183.38 231,341.87 215,189.37 231,348.31 214,905.16 231,042.76 214,598.19 230,712.73 214,551.73 230,662.79 214,803.60 230,933.57 215,116.00 231,269.43
54 Welding Set Unit/Jam 120,086 120,086 120,410.90 120,410.90 120,576.89 120,576.89 120,580.25 120,580.25 120,420.99 120,420.99 120,248.98 120,248.98 120,222.95 120,222.95 120,364.09 120,364.09 120,539.14 120,539.14
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 208,765 435,554 209,329.71 436,732.46 209,618.29 437,334.53 209,624.13 437,346.71 209,347.27 436,769.08 209,048.23 436,145.20 209,002.98 436,050.78 209,248.33 436,562.67 209,552.65 437,197.58
HARGA SATUAN DASAR BAHAN KABUPATEN PAMEKASAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 291,000 291,000 291,787.35 291,787.35 292,189.60 292,189.60 292,197.73 292,197.73 291,811.81 291,811.81 291,394.99 291,394.99 291,331.91 291,331.91 291,673.91 291,673.91 292,098.10 292,098.10
2 Agregat Pecah Mesin 20-30 mm M3 305,517 305,517 306,343.62 306,343.62 306,765.94 306,765.94 306,774.48 306,774.48 306,369.31 306,369.31 305,931.69 305,931.69 305,865.46 305,865.46 306,224.53 306,224.53 306,669.88 306,669.88
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 354,300 354,300 355,258.61 355,258.61 355,748.37 355,748.37 355,758.27 355,758.27 355,288.40 355,288.40 354,780.91 354,780.91 354,704.10 354,704.10 355,120.50 355,120.50 355,636.97 355,636.97
4 Bahan Agr. Base Kelas A M3 315,400 315,400 316,253.36 316,253.36 316,689.35 316,689.35 316,698.16 316,698.16 316,279.88 316,279.88 315,828.11 315,828.11 315,759.74 315,759.74 316,130.42 316,130.42 316,590.18 316,590.18
5 Bahan Agr. Base Kelas B M3 286,000 286,000 286,773.82 286,773.82 287,169.16 287,169.16 287,177.15 287,177.15 286,797.87 286,797.87 286,388.20 286,388.20 286,326.20 286,326.20 286,662.33 286,662.33 287,079.23 287,079.23
6 Bahan Agr. Base Kelas C M3 282,000 282,000 282,762.99 282,762.99 283,152.81 283,152.81 283,160.69 283,160.69 282,786.71 282,786.71 282,382.77 282,382.77 282,321.64 282,321.64 282,653.07 282,653.07 283,064.14 283,064.14
7 Bahan Agr. Base Kelas C2 M3 240,000 240,000 240,649.36 240,649.36 240,981.11 240,981.11 240,987.82 240,987.82 240,669.54 240,669.54 240,325.76 240,325.76 240,273.74 240,273.74 240,555.80 240,555.80 240,905.65 240,905.65
8 Bahan Agr. Base Kelas S M3 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82 205,474.75 205,474.75 205,773.58 205,773.58
9 Bahan Pilihan M3 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40 138,319.59 138,319.59 138,520.75 138,520.75
10 Bahan Tanah Timbunan M3 111,617 111,617 111,919.00 111,919.00 112,073.29 112,073.29 112,076.41 112,076.41 111,928.38 111,928.38 111,768.50 111,768.50 111,744.31 111,744.31 111,875.49 111,875.49 112,038.19 112,038.19
11 Batu Belah/Kerakal M3 313,000 313,000 313,846.87 313,846.87 314,279.54 314,279.54 314,288.28 314,288.28 313,873.19 313,873.19 313,424.85 313,424.85 313,357.00 313,357.00 313,724.86 313,724.86 314,181.12 314,181.12
12 Batu Kali M3 345,000 345,000 345,933.45 345,933.45 346,410.35 346,410.35 346,419.99 346,419.99 345,962.46 345,962.46 345,468.28 345,468.28 345,393.50 345,393.50 345,798.96 345,798.96 346,301.87 346,301.87
13 Chipping M3 228,000 228,000 228,616.89 228,616.89 228,932.06 228,932.06 228,938.43 228,938.43 228,636.06 228,636.06 228,309.47 228,309.47 228,260.05 228,260.05 228,528.01 228,528.01 228,860.37 228,860.37
14 Chipping (kg) Kg 282 282 282.76 282.76 283.15 283.15 283.16 283.16 282.79 282.79 282.38 282.38 282.32 282.32 282.65 282.65 283.06 283.06
15 Filler Cement Kg 4,063 4,063 4,073.99 4,073.99 4,079.61 4,079.61 4,079.72 4,079.72 4,074.33 4,074.33 4,068.51 4,068.51 4,067.63 4,067.63 4,072.41 4,072.41 4,078.33 4,078.33
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 369,000 369,000 369,998.39 369,998.39 370,508.46 370,508.46 370,518.78 370,518.78 370,029.41 370,029.41 369,500.86 369,500.86 369,420.87 369,420.87 369,854.54 369,854.54 370,392.44 370,392.44
18 Kapur M3 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
19 Pasir Beton (Kasar) M3 336,367 336,367 337,277.09 337,277.09 337,742.06 337,742.06 337,751.46 337,751.46 337,305.38 337,305.38 336,823.56 336,823.56 336,750.65 336,750.65 337,145.97 337,145.97 337,636.30 337,636.30
20 Pasir Halus (untuk HRS) M3 307,000 307,000 307,830.64 307,830.64 308,255.01 308,255.01 308,263.59 308,263.59 307,856.45 307,856.45 307,416.70 307,416.70 307,350.16 307,350.16 307,710.96 307,710.96 308,158.48 308,158.48
21 Pasir Pasang (Sedang) M3 298,667 298,667 299,475.09 299,475.09 299,887.94 299,887.94 299,896.29 299,896.29 299,500.20 299,500.20 299,072.39 299,072.39 299,007.65 299,007.65 299,358.66 299,358.66 299,794.03 299,794.03
22 Pasir Urug M3 188,000 188,000 188,508.66 188,508.66 188,768.54 188,768.54 188,773.79 188,773.79 188,524.47 188,524.47 188,255.18 188,255.18 188,214.43 188,214.43 188,435.38 188,435.38 188,709.43 188,709.43
23 Pasir Urug (ada unsur lempung) M3 164,000 164,000 164,443.73 164,443.73 164,670.43 164,670.43 164,675.01 164,675.01 164,457.52 164,457.52 164,222.60 164,222.60 164,187.05 164,187.05 164,379.80 164,379.80 164,618.86 164,618.86
24 Sirtu M3 159,000 159,000 159,430.20 159,430.20 159,649.99 159,649.99 159,654.43 159,654.43 159,443.57 159,443.57 159,215.82 159,215.82 159,181.35 159,181.35 159,368.22 159,368.22 159,599.99 159,599.99
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 64,662 162,925 64,836.95 163,365.82 64,926.34 163,591.03 64,928.14 163,595.59 64,842.39 163,379.52 64,749.77 163,146.14 64,735.75 163,110.83 64,811.75 163,302.31 64,906.01 163,539.81
26 Anti Pengelupas Liter 103,000 103,000 103,278.68 103,278.68 103,421.06 103,421.06 103,423.94 103,423.94 103,287.34 103,287.34 103,139.81 103,139.81 103,117.48 103,117.48 103,238.53 103,238.53 103,388.68 103,388.68
27 Arbocell Kg 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
28 Asbuton Curah Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
29 Aspal Emulsi (CRS-1/53 R-65) Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
30 Aspal Emulsi (CSS-1) Kg 12,150 12,150 12,182.87 12,182.87 12,199.67 12,199.67 12,200.01 12,200.01 12,183.90 12,183.90 12,166.49 12,166.49 12,163.86 12,163.86 12,178.14 12,178.14 12,195.85 12,195.85
31 Aspal Minyak (Drum) Kg 10,450 10,450 10,478.27 10,478.27 10,492.72 10,492.72 10,493.01 10,493.01 10,479.15 10,479.15 10,464.18 10,464.18 10,461.92 10,461.92 10,474.20 10,474.20 10,489.43 10,489.43
32 Aspal Modifikasi (BNA) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
33 Aspal Modifikasi (JAP-57) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
34 Aspal Modifikasi (Retona) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
35 Aspal Modifikasi (Starbit) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
36 Aspal Minyak (Curah) Kg 9,350 9,350 9,375.30 9,375.30 9,388.22 9,388.22 9,388.48 9,388.48 9,376.08 9,376.08 9,362.69 9,362.69 9,360.66 9,360.66 9,371.65 9,371.65 9,385.28 9,385.28
37 Assetilline Botol 144,000 144,000 144,389.61 144,389.61 144,588.67 144,588.67 144,592.69 144,592.69 144,401.72 144,401.72 144,195.46 144,195.46 144,164.24 144,164.24 144,333.48 144,333.48 144,543.39 144,543.39
38 Bahan Pengawet: Kreosot Liter 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 545,006 545,006 546,480.23 546,480.23 547,233.60 547,233.60 547,248.83 547,248.83 546,526.05 546,526.05 545,745.39 545,745.39 545,627.25 545,627.25 546,267.78 546,267.78 547,062.23 547,062.23
41 Beton K-125 (fc' 10 MPa) M3 563,480 563,480 565,004.98 565,004.98 565,783.89 565,783.89 565,799.64 565,799.64 565,052.36 565,052.36 564,245.23 564,245.23 564,123.09 564,123.09 564,785.33 564,785.33 565,606.72 565,606.72
42 Beton K-175 (fc' 15 MPa) M3 609,667 609,667 611,316.86 611,316.86 612,159.62 612,159.62 612,176.66 612,176.66 611,368.13 611,368.13 610,494.84 610,494.84 610,362.68 610,362.68 611,079.21 611,079.21 611,967.92 611,967.92
43 Beton K-250 (fc' 20 MPa) M3 678,948 678,948 680,784.69 680,784.69 681,723.21 681,723.21 681,742.19 681,742.19 680,841.78 680,841.78 679,869.26 679,869.26 679,722.08 679,722.08 680,520.03 680,520.03 681,509.73 681,509.73
44 Beton K-300 (fc' 25 MPa) M3 706,660 706,660 708,571.82 708,571.82 709,548.65 709,548.65 709,568.40 709,568.40 708,631.24 708,631.24 707,619.02 707,619.02 707,465.84 707,465.84 708,296.35 708,296.35 709,326.46 709,326.46
45 Beton K-350 (fc' 30 MPa) M3 734,372 734,372 736,358.95 736,358.95 737,374.09 737,374.09 737,394.61 737,394.61 736,420.70 736,420.70 735,368.79 735,368.79 735,209.60 735,209.60 736,072.68 736,072.68 737,143.18 737,143.18
46 Beton K-400 (fc' 35 MPa) M3 762,084 762,084 764,146.08 764,146.08 765,199.52 765,199.52 765,220.82 765,220.82 764,210.16 764,210.16 763,118.55 763,118.55 762,953.36 762,953.36 763,849.01 763,849.01 764,959.90 764,959.90
47 Beton K-450 (fc' 40 MPa) M3 799,034 799,034 801,195.59 801,195.59 802,300.11 802,300.11 802,322.44 802,322.44 801,262.77 801,262.77 800,118.24 800,118.24 799,945.03 799,945.03 800,884.11 800,884.11 802,048.87 802,048.87
48 Beton K-500 (fc' 45 MPa) M3 831,365 831,365 833,613.90 833,613.90 834,763.12 834,763.12 834,786.35 834,786.35 833,683.81 833,683.81 832,492.97 832,492.97 832,312.75 832,312.75 833,289.83 833,289.83 834,501.71 834,501.71
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 71,067 71,067 71,259.28 71,259.28 71,357.52 71,357.52 71,359.51 71,359.51 71,265.26 71,265.26 71,163.46 71,163.46 71,148.06 71,148.06 71,231.58 71,231.58 71,335.17 71,335.17
51 Cat Anti Karat Kg 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
52 Cat Marka (Non Thermoplas) Kg 60,000 60,000 60,162.34 60,162.34 60,245.28 60,245.28 60,246.96 60,246.96 60,167.38 60,167.38 60,081.44 60,081.44 60,068.43 60,068.43 60,138.95 60,138.95 60,226.41 60,226.41
53 Cat Marka (Thermoplastic) Kg 51,583 51,583 51,722.57 51,722.57 51,793.87 51,793.87 51,795.31 51,795.31 51,726.90 51,726.90 51,653.02 51,653.02 51,641.83 51,641.83 51,702.46 51,702.46 51,777.65 51,777.65
54 Cerucuk Diameter 10-15 cm M' 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23 23,053.26 23,053.26 23,086.79 23,086.79
55 Cold Mix (Aspal Dingin) Kg 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,205,000 1,205,000 1,208,260.31 1,208,260.31 1,209,926.01 1,209,926.01 1,209,959.69 1,209,959.69 1,208,361.64 1,208,361.64 1,206,635.60 1,206,635.60 1,206,374.39 1,206,374.39 1,207,790.59 1,207,790.59 1,209,547.12 1,209,547.12
57 Curing Compound Liter 46,000 46,000 46,124.46 46,124.46 46,188.05 46,188.05 46,189.33 46,189.33 46,128.33 46,128.33 46,062.44 46,062.44 46,052.47 46,052.47 46,106.53 46,106.53 46,173.58 46,173.58
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 563,000 563,000 564,523.28 564,523.28 565,301.53 565,301.53 565,317.26 565,317.26 564,570.62 564,570.62 563,764.18 563,764.18 563,642.14 563,642.14 564,303.82 564,303.82 565,124.51 565,124.51
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 656,000 656,000 657,774.91 657,774.91 658,681.71 658,681.71 658,700.05 658,700.05 657,830.07 657,830.07 656,890.42 656,890.42 656,748.22 656,748.22 657,519.19 657,519.19 658,475.45 658,475.45
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 831,000 831,000 833,248.40 833,248.40 834,397.10 834,397.10 834,420.33 834,420.33 833,318.27 833,318.27 832,127.95 832,127.95 831,947.82 831,947.82 832,924.46 832,924.46 834,135.82 834,135.82
61 Kerosen/Minyak Tanah Liter 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 57,233 57,233 57,387.85 57,387.85 57,466.97 57,466.97 57,468.57 57,468.57 57,392.67 57,392.67 57,310.68 57,310.68 57,298.28 57,298.28 57,365.54 57,365.54 57,448.97 57,448.97
64 Oxygen (Isi 6 M3) Botol 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21 158,365.90 158,365.90 158,596.22 158,596.22
65 Polytene 125 Mikron Kg 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51 25,057.90 25,057.90 25,094.34 25,094.34
66 Sand Sheet Ton 1,275,000 1,275,000 1,278,449.71 1,278,449.71 1,280,212.16 1,280,212.16 1,280,247.80 1,280,247.80 1,278,556.92 1,278,556.92 1,276,730.61 1,276,730.61 1,276,454.23 1,276,454.23 1,277,952.70 1,277,952.70 1,279,811.27 1,279,811.27
67 Seal Coat M2 102,000 102,000 102,275.98 102,275.98 102,416.97 102,416.97 102,419.82 102,419.82 102,284.55 102,284.55 102,138.45 102,138.45 102,116.34 102,116.34 102,236.22 102,236.22 102,384.90 102,384.90
68 Seal Guard Kg 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
69 Semen/PC (50 kg) Zak 67,000 67,000 67,181.28 67,181.28 67,273.89 67,273.89 67,275.77 67,275.77 67,186.91 67,186.91 67,090.94 67,090.94 67,076.42 67,076.42 67,155.16 67,155.16 67,252.83 67,252.83
70 Semen/PC (kg) Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28 2,004.63 2,004.63 2,007.55 2,007.55
71 Slurry Seal Ton 37,000 37,000 37,100.11 37,100.11 37,151.25 37,151.25 37,152.29 37,152.29 37,103.22 37,103.22 37,050.22 37,050.22 37,042.20 37,042.20 37,085.69 37,085.69 37,139.62 37,139.62
72 Solar Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55 11,025.47 11,025.47 11,041.51 11,041.51
73 Thinner Liter 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06 36,083.37 36,083.37 36,135.85 36,135.85
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
75 Baja Prategang Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53 18,041.69 18,041.69 18,067.92 18,067.92
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11 15,034.74 15,034.74 15,056.60 15,056.60
77 Baja Tulangan (Polos) U25 Kg 14,500 14,500 14,539.23 14,539.23 14,559.28 14,559.28 14,559.68 14,559.68 14,540.45 14,540.45 14,519.68 14,519.68 14,516.54 14,516.54 14,533.58 14,533.58 14,554.72 14,554.72
78 Baja Tulangan (Polos) U32 Kg 14,500 14,500 14,539.23 14,539.23 14,559.28 14,559.28 14,559.68 14,559.68 14,540.45 14,540.45 14,519.68 14,519.68 14,516.54 14,516.54 14,533.58 14,533.58 14,554.72 14,554.72
79 Baja Tulangan (Polos) U36 Kg 14,500 14,500 14,539.23 14,539.23 14,559.28 14,559.28 14,559.68 14,559.68 14,540.45 14,540.45 14,519.68 14,519.68 14,516.54 14,516.54 14,533.58 14,533.58 14,554.72 14,554.72
80 Baja Tulangan (Ulir) D16 Kg 14,983 14,983 15,023.54 15,023.54 15,044.25 15,044.25 15,044.67 15,044.67 15,024.80 15,024.80 15,003.34 15,003.34 15,000.09 15,000.09 15,017.70 15,017.70 15,039.54 15,039.54
81 Baja Tulangan (Ulir) D19 Kg 14,983 14,983 15,023.54 15,023.54 15,044.25 15,044.25 15,044.67 15,044.67 15,024.80 15,024.80 15,003.34 15,003.34 15,000.09 15,000.09 15,017.70 15,017.70 15,039.54 15,039.54
82 Baja Tulangan (Ulir) D24 Kg 14,983 14,983 15,023.54 15,023.54 15,044.25 15,044.25 15,044.67 15,044.67 15,024.80 15,024.80 15,003.34 15,003.34 15,000.09 15,000.09 15,017.70 15,017.70 15,039.54 15,039.54
83 Baja Tulangan (Ulir) D32 Kg 14,983 14,983 15,023.54 15,023.54 15,044.25 15,044.25 15,044.67 15,044.67 15,024.80 15,024.80 15,003.34 15,003.34 15,000.09 15,000.09 15,017.70 15,017.70 15,039.54 15,039.54
84 Baja Tulangan (Ulir) D36 Kg 14,983 14,983 15,023.54 15,023.54 15,044.25 15,044.25 15,044.67 15,044.67 15,024.80 15,024.80 15,003.34 15,003.34 15,000.09 15,000.09 15,017.70 15,017.70 15,039.54 15,039.54
85 Besi Beton Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41 10,023.16 10,023.16 10,037.74 10,037.74
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,009,000 12,009,000 12,041,492.19 12,041,492.19 12,058,092.45 12,058,092.45 12,058,428.12 12,058,428.12 12,042,501.97 12,042,501.97 12,025,300.30 12,025,300.30 12,022,697.13 12,022,697.13 12,036,810.92 12,036,810.92 12,054,316.53 12,054,316.53
87 Box Culvert Type DUB 200×200 M' 12,748,000 12,748,000 12,782,491.67 12,782,491.67 12,800,113.46 12,800,113.46 12,800,469.79 12,800,469.79 12,783,563.59 12,783,563.59 12,765,303.38 12,765,303.38 12,762,540.02 12,762,540.02 12,777,522.32 12,777,522.32 12,796,105.18 12,796,105.18
88 Box Culvert Type uk 300×200 M' 13,764,000 13,764,000 13,801,240.61 13,801,240.61 13,820,266.84 13,820,266.84 13,820,651.57 13,820,651.57 13,802,397.96 13,802,397.96 13,782,682.44 13,782,682.44 13,779,698.84 13,779,698.84 13,795,875.21 13,795,875.21 13,815,939.10 13,815,939.10
89 Casing M2 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69 12,027.79 12,027.79 12,045.28 12,045.28
90 Ducting (Kabel Prestress) M' 179,000 179,000 179,484.31 179,484.31 179,731.75 179,731.75 179,736.75 179,736.75 179,499.36 179,499.36 179,242.96 179,242.96 179,204.16 179,204.16 179,414.54 179,414.54 179,675.46 179,675.46
91 Ducting (Strand Prestress) M' 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93 156,361.27 156,361.27 156,588.67 156,588.67
92 Expansion Cap M2 9,000 9,000 9,024.35 9,024.35 9,036.79 9,036.79 9,037.04 9,037.04 9,025.11 9,025.11 9,012.22 9,012.22 9,010.27 9,010.27 9,020.84 9,020.84 9,033.96 9,033.96
93 Expansion Join Baja Siku M' 2,010,000 2,010,000 2,015,438.36 2,015,438.36 2,018,216.82 2,018,216.82 2,018,273.01 2,018,273.01 2,015,607.37 2,015,607.37 2,012,728.25 2,012,728.25 2,012,292.55 2,012,292.55 2,014,654.84 2,014,654.84 2,017,584.83 2,017,584.83
94 Expansion Join Tipe Rubber M' 1,455,000 1,455,000 1,458,936.73 1,458,936.73 1,460,948.00 1,460,948.00 1,460,988.67 1,460,988.67 1,459,059.07 1,459,059.07 1,456,974.93 1,456,974.93 1,456,659.53 1,456,659.53 1,458,369.55 1,458,369.55 1,460,490.51 1,460,490.51
95 Expansion Join Tipe Torma M' 1,669,000 1,669,000 1,673,515.74 1,673,515.74 1,675,822.82 1,675,822.82 1,675,869.48 1,675,869.48 1,673,656.07 1,673,656.07 1,671,265.40 1,671,265.40 1,670,903.62 1,670,903.62 1,672,865.14 1,672,865.14 1,675,298.05 1,675,298.05
96 Expansion Tipe Joint Asphaltic Plug M' 1,980,000 1,980,000 1,985,357.19 1,985,357.19 1,988,094.18 1,988,094.18 1,988,149.53 1,988,149.53 1,985,523.68 1,985,523.68 1,982,687.53 1,982,687.53 1,982,258.33 1,982,258.33 1,984,585.36 1,984,585.36 1,987,471.62 1,987,471.62
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 38,000 38,000 38,102.81 38,102.81 38,155.34 38,155.34 38,156.41 38,156.41 38,106.01 38,106.01 38,051.58 38,051.58 38,043.34 38,043.34 38,088.00 38,088.00 38,143.39 38,143.39
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,000 30,000 30,081.17 30,081.17 30,122.64 30,122.64 30,123.48 30,123.48 30,083.69 30,083.69 30,040.72 30,040.72 30,034.22 30,034.22 30,069.48 30,069.48 30,113.21 30,113.21
99 Glass Bead Kg 63,000 63,000 63,170.46 63,170.46 63,257.54 63,257.54 63,259.30 63,259.30 63,175.75 63,175.75 63,085.51 63,085.51 63,071.86 63,071.86 63,145.90 63,145.90 63,237.73 63,237.73
100 Joint Sealent Kg 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
101 Joint Socket Pile 16×16×16 Set 84,000 84,000 84,227.27 84,227.27 84,343.39 84,343.39 84,345.74 84,345.74 84,234.34 84,234.34 84,114.02 84,114.02 84,095.81 84,095.81 84,194.53 84,194.53 84,316.98 84,316.98
102 Joint Socket Pile 35×35 Set 722,000 722,000 723,953.48 723,953.48 724,951.52 724,951.52 724,971.70 724,971.70 724,014.19 724,014.19 722,980.00 722,980.00 722,823.49 722,823.49 723,672.04 723,672.04 724,724.50 724,724.50
103 Kawat Beton Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
104 Kawat Bronjong Kg 28,000 28,000 28,075.76 28,075.76 28,114.46 28,114.46 28,115.25 28,115.25 28,078.11 28,078.11 28,038.01 28,038.01 28,031.94 28,031.94 28,064.84 28,064.84 28,105.66 28,105.66
105 Kawat Las Dos 140,000 140,000 140,378.79 140,378.79 140,572.32 140,572.32 140,576.23 140,576.23 140,390.56 140,390.56 140,190.03 140,190.03 140,159.68 140,159.68 140,324.22 140,324.22 140,528.30 140,528.30
106 Kayu Acuan (Kelas III/Meranti) M3 3,972,000 3,972,000 3,982,746.85 3,982,746.85 3,988,237.42 3,988,237.42 3,988,348.45 3,988,348.45 3,983,080.84 3,983,080.84 3,977,391.36 3,977,391.36 3,976,530.35 3,976,530.35 3,981,198.51 3,981,198.51 3,986,988.53 3,986,988.53
107 Kayu Perancah (Gelam) M3 2,558,755 2,558,755 2,565,678.35 2,565,678.35 2,569,215.37 2,569,215.37 2,569,286.89 2,569,286.89 2,565,893.50 2,565,893.50 2,562,228.35 2,562,228.35 2,561,673.69 2,561,673.69 2,564,680.91 2,564,680.91 2,568,410.83 2,568,410.83
108 Kerb Pracetak Type 1 (Peninggi) Buah 51,000 51,000 51,137.99 51,137.99 51,208.49 51,208.49 51,209.91 51,209.91 51,142.28 51,142.28 51,069.22 51,069.22 51,058.17 51,058.17 51,118.11 51,118.11 51,192.45 51,192.45
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
110 Marmer Nama Jembatan Buah 554,000 554,000 555,498.93 555,498.93 556,264.74 556,264.74 556,280.22 556,280.22 555,545.52 555,545.52 554,751.97 554,751.97 554,631.88 554,631.88 555,282.98 555,282.98 556,090.55 556,090.55
111 Mata Kucing Buah 145,000 145,000 145,392.32 145,392.32 145,592.76 145,592.76 145,596.81 145,596.81 145,404.51 145,404.51 145,196.81 145,196.81 145,165.38 145,165.38 145,335.80 145,335.80 145,547.16 145,547.16
112 Matras Concrete (Tebal=10 cm) M2 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98 135,312.64 135,312.64 135,509.43 135,509.43
113 Mini Pile 16×16×16 M' 125,000 125,000 125,338.21 125,338.21 125,511.00 125,511.00 125,514.49 125,514.49 125,348.72 125,348.72 125,169.67 125,169.67 125,142.57 125,142.57 125,289.48 125,289.48 125,471.69 125,471.69
114 Mini Timber Pile Buah 29,000 29,000 29,078.46 29,078.46 29,118.55 29,118.55 29,119.36 29,119.36 29,080.90 29,080.90 29,039.36 29,039.36 29,033.08 29,033.08 29,067.16 29,067.16 29,109.43 29,109.43
115 Multipleks 12 mm Lbr 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30 180,416.85 180,416.85 180,679.24 180,679.24
116 Paku Kg 20,633 20,633 20,688.83 20,688.83 20,717.35 20,717.35 20,717.92 20,717.92 20,690.56 20,690.56 20,661.01 20,661.01 20,656.53 20,656.53 20,680.78 20,680.78 20,710.86 20,710.86
117 Paving Block (Model Bata 8 cm) M2 88,000 88,000 88,238.10 88,238.10 88,359.74 88,359.74 88,362.20 88,362.20 88,245.50 88,245.50 88,119.45 88,119.45 88,100.37 88,100.37 88,203.79 88,203.79 88,332.07 88,332.07
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 61,409,000 61,409,000 61,575,151.46 61,575,151.46 61,660,038.26 61,660,038.26 61,661,754.72 61,661,754.72 61,580,315.07 61,580,315.07 61,492,352.94 61,492,352.94 61,479,041.41 61,479,041.41 61,551,213.38 61,551,213.38 61,640,729.76 61,640,729.76
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 86,996,000 86,996,000 87,231,381.01 87,231,381.01 87,351,637.19 87,351,637.19 87,354,068.84 87,354,068.84 87,238,696.11 87,238,696.11 87,114,083.21 87,114,083.21 87,095,225.24 87,095,225.24 87,197,468.77 87,197,468.77 87,324,283.51 87,324,283.51
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 166,273,000 166,273,000 166,722,877.09 166,722,877.09 166,952,719.33 166,952,719.33 166,957,366.88 166,957,366.88 166,736,858.23 166,736,858.23 166,498,689.11 166,498,689.11 166,462,646.40 166,462,646.40 166,658,061.57 166,658,061.57 166,900,439.01 166,900,439.01
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 218,041,000 218,041,000 218,630,943.35 218,630,943.35 218,932,345.45 218,932,345.45 218,938,439.98 218,938,439.98 218,649,277.42 218,649,277.42 218,336,955.93 218,336,955.93 218,289,691.55 218,289,691.55 218,545,947.95 218,545,947.95 218,863,788.00 218,863,788.00
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 277,944,000 277,944,000 278,696,020.10 278,696,020.10 279,080,227.22 279,080,227.22 279,087,996.12 279,087,996.12 278,719,391.14 278,719,391.14 278,321,264.71 278,321,264.71 278,261,015.26 278,261,015.26 278,587,673.68 278,587,673.68 278,992,834.80 278,992,834.80
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 335,339,000 335,339,000 336,246,311.07 336,246,311.07 336,709,856.36 336,709,856.36 336,719,229.52 336,719,229.52 336,274,508.20 336,274,508.20 335,794,169.28 335,794,169.28 335,721,478.42 335,721,478.42 336,115,591.28 336,115,591.28 336,604,417.54 336,604,417.54
124 Pelat Rambu (Eng. Grade) Buah 194,000 194,000 194,524.90 194,524.90 194,793.07 194,793.07 194,798.49 194,798.49 194,541.21 194,541.21 194,263.32 194,263.32 194,221.27 194,221.27 194,449.27 194,449.27 194,732.07 194,732.07
125 Pelat Rambu (High L Grade) Buah 226,000 226,000 226,611.48 226,611.48 226,923.88 226,923.88 226,930.20 226,930.20 226,630.48 226,630.48 226,306.76 226,306.76 226,257.77 226,257.77 226,523.38 226,523.38 226,852.82 226,852.82
126 Pemantul Cahaya (Reflector) Buah 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83 13,030.11 13,030.11 13,049.06 13,049.06
127 Pipa Baja D10" Kg 21,000 21,000 21,056.82 21,056.82 21,085.85 21,085.85 21,086.43 21,086.43 21,058.58 21,058.58 21,028.50 21,028.50 21,023.95 21,023.95 21,048.63 21,048.63 21,079.24 21,079.24
128 Pipa Drainase Baja Dia 3" M' 685,000 685,000 686,853.37 686,853.37 687,800.26 687,800.26 687,819.41 687,819.41 686,910.97 686,910.97 685,929.78 685,929.78 685,781.29 685,781.29 686,586.35 686,586.35 687,584.88 687,584.88
129 Pipa Galvanis Dia 1,5" M' 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28 315,729.49 315,729.49 316,188.67 316,188.67
130 Pipa Galvanis Dia 2" M' 450,000 450,000 451,217.54 451,217.54 451,839.59 451,839.59 451,852.17 451,852.17 451,255.38 451,255.38 450,610.80 450,610.80 450,513.26 450,513.26 451,042.13 451,042.13 451,698.10 451,698.10
131 Pipa Galvanis Dia 3" M' 222,621 580,000 223,223.28 581,569.28 223,531.01 582,371.02 223,537.23 582,387.24 223,242.00 581,618.05 222,923.12 580,787.26 222,874.86 580,661.53 223,136.50 581,343.19 223,461.01 582,188.66
132 Pipa Porus M' 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90 42,097.27 42,097.27 42,158.49 42,158.49
133 Pipa PVC Dia 4" M' 276,000 276,000 276,746.76 276,746.76 277,128.28 277,128.28 277,135.99 277,135.99 276,769.97 276,769.97 276,374.63 276,374.63 276,314.80 276,314.80 276,639.17 276,639.17 277,041.50 277,041.50
134 Plastik Filter M2 33,000 33,000 33,089.29 33,089.29 33,134.90 33,134.90 33,135.83 33,135.83 33,092.06 33,092.06 33,044.79 33,044.79 33,037.64 33,037.64 33,076.42 33,076.42 33,124.53 33,124.53
135 Rel Pengaman M' 157,000 157,000 157,424.79 157,424.79 157,641.81 157,641.81 157,646.20 157,646.20 157,437.99 157,437.99 157,213.10 157,213.10 157,179.07 157,179.07 157,363.59 157,363.59 157,592.45 157,592.45
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,897,000 1,897,000 1,902,132.62 1,902,132.62 1,904,754.88 1,904,754.88 1,904,807.91 1,904,807.91 1,902,292.13 1,902,292.13 1,899,574.88 1,899,574.88 1,899,163.67 1,899,163.67 1,901,393.15 1,901,393.15 1,904,158.42 1,904,158.42
137 Strip Bearing Buah 291,000 291,000 291,787.35 291,787.35 292,189.60 292,189.60 292,197.73 292,197.73 291,811.81 291,811.81 291,394.99 291,394.99 291,331.91 291,331.91 291,673.91 291,673.91 292,098.10 292,098.10
138 Tiang Pancang Baja Diameter 400 M' 672,000 672,000 673,818.20 673,818.20 674,747.12 674,747.12 674,765.90 674,765.90 673,874.70 673,874.70 672,912.13 672,912.13 672,766.46 672,766.46 673,556.24 673,556.24 674,535.82 674,535.82
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 822,000 822,000 824,224.05 824,224.05 825,360.31 825,360.31 825,383.29 825,383.29 824,293.17 824,293.17 823,115.73 823,115.73 822,937.55 822,937.55 823,903.62 823,903.62 825,101.86 825,101.86
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,718,000 1,718,000 1,722,648.31 1,722,648.31 1,725,023.14 1,725,023.14 1,725,071.16 1,725,071.16 1,722,792.77 1,722,792.77 1,720,331.91 1,720,331.91 1,719,959.50 1,719,959.50 1,721,978.61 1,721,978.61 1,724,482.95 1,724,482.95
HARGA SATUAN DASAR UPAH KABUPATEN PAMEKASAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 111,462.33 111,462.33 111,349.68 111,349.68 111,187.70 111,187.70 111,126.59 111,126.59 111,220.72 111,220.72 111,380.38 111,380.38 111,457.20 111,457.20 111,287.29 111,287.29
2 Tukang OH 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 125,323.52
3 Mandor OH 143,595.62 143,595.62 143,450.49 143,450.49 143,241.82 143,241.82 143,163.09 143,163.09 143,284.35 143,284.35 143,490.03 143,490.03 143,589.01 143,589.01 143,370.11 143,370.11
4 Operator OH 297,232.88 297,232.88 296,932.48 296,932.48 296,500.54 296,500.54 296,337.58 296,337.58 296,588.58 296,588.58 297,014.33 297,014.33 297,219.20 297,219.20 296,766.10 296,766.10
5 Pembantu Operator OH 185,770.55 185,770.55 185,582.80 185,582.80 185,312.84 185,312.84 185,210.98 185,210.98 185,367.86 185,367.86 185,633.96 185,633.96 185,762.00 185,762.00 185,478.81 185,478.81
6 Sopir OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76
7 Pembantu Sopir OH 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 120,310.58
8 Mekanik OH 166,691.42 166,691.42 166,522.95 166,522.95 166,280.71 166,280.71 166,189.32 166,189.32 166,330.08 166,330.08 166,568.85 166,568.85 166,683.74 166,683.74 166,429.64 166,429.64
9 Pembantu Mekanik OH 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27 120,310.58 120,310.58
10 Kepala Tukang OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76
11 Pemasak Aspal OH 139,578.96 139,578.96 139,437.89 139,437.89 139,235.05 139,235.05 139,158.52 139,158.52 139,276.39 139,276.39 139,476.33 139,476.33 139,572.53 139,572.53 139,359.76 139,359.76

HARGA SATUAN DASAR ALAT KABUPATEN PAMEKASAN TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 436,892.94 488,024.26 436,451.39 487,531.04 435,816.50 486,821.84 435,576.96 486,554.26 435,945.90 486,966.38 436,571.70 487,665.43 436,872.83 488,001.80 436,206.83 887,106.81
2 Asphalt Distribution Unit/Jam 268,999.90 346,436.98 268,728.03 346,086.85 268,337.12 345,583.40 268,189.63 345,393.46 268,416.79 345,686.01 268,802.11 346,182.25 268,987.52 346,421.03 268,577.45 592,084.42
3 Asphalt Finisher Unit/Jam 197,575.79 936,886.09 197,376.11 935,939.21 197,088.99 934,577.73 196,980.66 934,064.05 197,147.51 934,855.21 197,430.51 936,197.21 197,566.69 936,842.96 197,265.51 1,116,238.18
4 Asphalt Liquid Mixer Unit/Jam 70,496.53 128,533.14 70,425.28 128,403.24 70,322.83 128,216.45 70,284.18 128,145.98 70,343.71 128,254.52 70,444.69 128,438.63 70,493.28 128,527.22 70,385.82 192,850.44
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 94,613.76 94,613.76 94,518.14 94,518.14 94,380.64 94,380.64 94,328.77 94,328.77 94,408.67 94,408.67 94,544.19 94,544.19 94,609.40 94,609.40 94,465.17 181,056.67
6 Asphalt Mixing Plant Unit/Jam 1,057,447.89 5,888,377.25 1,056,379.17 5,882,426.11 1,054,842.48 5,873,869.09 1,054,262.70 5,870,640.58 1,055,155.67 5,875,613.09 1,056,670.36 5,884,047.61 1,057,399.21 5,888,106.19 1,055,787.24 6,846,917.22
7 Asphalt Sprayer Unit/Jam 87,193.07 87,473.83 87,104.95 87,385.42 86,978.24 87,258.31 86,930.43 87,210.35 87,004.06 87,284.21 87,128.96 87,409.51 87,189.06 87,469.80 87,056.14 167,136.46
8 Asphalt Tanker Unit/Jam 408,137.78 472,961.79 407,725.29 472,483.78 407,132.18 471,796.47 406,908.41 471,537.15 407,253.07 471,936.55 407,837.68 472,614.02 408,118.99 472,940.01 407,496.83 845,750.96
9 Blending Equipment Unit/Jam 132,644.78 209,870.52 132,510.72 209,658.41 132,317.96 209,353.42 132,245.23 209,238.36 132,357.25 209,415.58 132,547.25 209,716.20 132,638.67 209,860.86 132,436.47 330,938.81
10 Bore Pile Machine Unit/Jam 365,468.83 635,636.54 365,099.47 634,994.13 364,568.37 634,070.42 364,367.98 633,721.91 364,676.61 634,258.68 365,200.11 635,169.17 365,452.01 635,607.28 364,894.89 969,119.18
11 Bore Pile Machine Dia 60 Unit/Jam 239,317.15 724,003.07 239,075.29 723,271.35 238,727.51 722,219.23 238,596.29 721,822.27 238,798.39 722,433.66 239,141.19 723,470.72 239,306.14 723,969.75 238,941.32 941,891.62
12 Bore Pile Machine Dia 80 Unit/Jam 946,137.58 946,137.58 945,181.36 945,181.36 943,806.43 943,806.43 943,287.68 943,287.68 944,086.65 944,086.65 945,441.90 945,441.90 946,094.03 946,094.03 944,651.74 1,810,566.67
13 Bulldozer 100-150 HP Unit/Jam 371,034.35 538,232.52 370,659.36 537,688.55 370,120.17 536,906.39 369,916.74 536,611.28 370,230.06 537,065.80 370,761.53 537,836.77 371,017.27 538,207.74 370,451.66 876,961.75
14 Cement Tanker Unit/Jam 345,061.94 444,845.16 344,713.20 444,395.58 344,211.76 443,749.12 344,022.56 443,505.22 344,313.96 443,880.88 344,808.22 444,518.07 345,046.06 444,824.68 344,520.05 759,950.83
15 Cold Milling Unit/Jam 538,927.39 1,404,753.74 538,382.72 1,403,334.02 537,599.54 1,401,292.62 537,304.06 1,400,522.41 537,759.16 1,401,708.67 538,531.12 1,403,720.85 538,902.58 1,404,689.08 538,081.04 1,895,779.61
16 Cold Recycler Unit/Jam 4,538,677.64 4,538,677.64 4,534,090.59 4,534,090.59 4,527,494.96 4,527,494.96 4,525,006.47 4,525,006.47 4,528,839.21 4,528,839.21 4,535,340.42 4,535,340.42 4,538,468.71 4,538,468.71 4,531,549.95 8,685,394.82
17 Compressor 4000-6500 L\M Unit/Jam 138,210.29 161,068.09 138,070.61 160,905.31 137,869.76 160,671.24 137,793.98 160,582.93 137,910.70 160,718.94 138,108.67 160,949.66 138,203.93 161,060.68 137,993.24 287,306.64
18 Concrete Breaker Unit/Jam 503,679.13 958,977.72 503,170.08 958,008.52 502,438.13 956,614.93 502,161.97 956,089.14 502,587.31 956,898.96 503,308.78 958,272.60 503,655.94 958,933.57 502,888.13 1,418,444.07
19 Concrete Mixer (350) Unit/Jam 93,686.17 93,686.17 93,591.49 93,591.49 93,455.34 93,455.34 93,403.98 93,403.98 93,483.09 93,483.09 93,617.29 93,617.29 93,681.86 93,681.86 93,539.04 179,281.60
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 106,672.37 106,672.37 106,564.57 106,564.57 106,409.55 106,409.55 106,351.06 106,351.06 106,441.14 106,441.14 106,593.94 106,593.94 106,667.46 106,667.46 106,504.85 204,132.52
21 Concrete Pan Mixer Unit/Jam 283,841.27 607,519.92 283,554.41 606,905.92 283,141.93 606,023.07 282,986.30 605,689.98 283,226.00 606,203.00 283,632.57 607,073.22 283,828.21 607,491.95 283,395.52 866,340.33
22 Concrete Pump Unit/Jam 216,127.51 248,402.34 215,909.08 248,151.29 215,595.00 247,790.31 215,476.50 247,654.12 215,659.01 247,863.88 215,968.59 248,219.70 216,117.56 248,390.91 215,788.09 445,814.38
23 Concrete Vibrator Unit/Jam 80,699.97 80,699.97 80,618.41 80,618.41 80,501.14 80,501.14 80,456.89 80,456.89 80,525.04 80,525.04 80,640.63 80,640.63 80,696.26 80,696.26 80,573.24 154,430.69
24 Crane 10-15 Ton Unit/Jam 289,406.79 389,226.46 289,114.30 388,833.09 288,693.73 388,267.46 288,535.05 388,054.05 288,779.45 388,382.74 289,193.99 388,940.27 289,393.47 389,208.55 288,952.30 653,483.31
25 Crane On Track 35 Ton Unit/Jam 240,244.74 455,890.98 240,001.93 455,430.23 239,652.81 454,767.73 239,521.09 454,517.77 239,723.96 454,902.75 240,068.09 455,555.77 240,233.68 455,869.99 239,867.45 675,049.51
26 Crane On Track 75-100 Ton Unit/Jam 377,527.45 571,369.97 377,145.90 570,792.51 376,597.27 569,962.19 376,390.28 569,648.92 376,709.09 570,131.42 377,249.86 570,949.85 377,510.07 571,343.67 376,934.57 915,989.71
27 Dump Truck 10 Ton Unit/Jam 357,120.56 383,591.09 356,759.63 383,203.41 356,240.66 382,645.97 356,044.86 382,435.65 356,346.43 382,759.58 356,857.97 383,309.04 357,104.12 383,573.43 356,559.72 709,829.12
28 Dump Truck 3-4 M3 Unit/Jam 194,793.03 264,900.78 194,596.16 264,633.05 194,313.09 264,248.10 194,206.29 264,102.85 194,370.78 264,326.55 194,649.80 264,706.00 194,784.06 264,888.58 194,487.12 442,761.37
29 Excavator 80-140 HP Unit/Jam 281,986.10 459,222.80 281,701.11 458,758.68 281,291.33 458,091.34 281,136.72 457,839.55 281,374.85 458,227.35 281,778.76 458,885.14 281,973.12 459,201.66 281,543.26 716,578.23
30 Flat Bed Truck 3-4 M3 Unit/Jam 342,279.18 456,895.14 341,933.26 456,433.38 341,435.86 455,769.42 341,248.19 455,518.91 341,537.23 455,904.74 342,027.51 456,559.20 342,263.43 456,874.11 341,741.66 769,435.08
31 Fulvi Mixer Unit/Jam 857,089.34 1,337,547.98 856,223.12 1,336,196.18 854,977.59 1,334,252.44 854,507.66 1,333,519.09 855,231.44 1,334,648.59 856,459.13 1,336,564.50 857,049.89 1,337,486.41 855,743.34 2,119,864.51
32 Generator Set Unit/Jam 381,237.79 551,125.00 380,852.49 550,568.00 380,298.47 549,767.10 380,089.45 549,464.93 380,411.39 549,930.33 380,957.47 550,719.76 381,220.24 551,099.63 380,639.08 899,172.27
33 Hot Recycler Unit/Jam 2,800,381.73 8,205,033.45 2,797,551.50 8,196,740.96 2,793,481.97 8,184,817.36 2,791,946.56 8,180,318.67 2,794,311.38 8,187,247.50 2,798,322.65 8,199,000.40 2,800,252.82 8,204,655.75 2,795,983.92 10,755,086.40
34 Jack Hammer Unit/Jam 52,872.39 52,872.39 52,818.96 52,818.96 52,742.12 52,742.12 52,713.13 52,713.13 52,757.78 52,757.78 52,833.52 52,833.52 52,869.96 52,869.96 52,789.36 101,178.73
35 Launching Gantry Unit/Jam 67,286,151.10 67,286,151.10 67,218,147.82 67,218,147.82 67,120,367.20 67,120,367.20 67,083,475.22 67,083,475.22 67,140,295.76 67,140,295.76 67,236,676.57 67,236,676.57 67,283,053.76 67,283,053.76 67,180,482.69 128,761,466.32
36 Motor Grader > 100 HP Unit/Jam 264,361.97 532,587.10 264,094.79 532,048.84 263,710.62 531,274.88 263,565.67 530,982.87 263,788.92 531,432.62 264,167.59 532,195.50 264,349.80 532,562.59 263,946.81 773,697.53
37 Pedestrian Roller Unit/Jam 87,193.07 87,193.07 87,104.95 87,104.95 86,978.24 86,978.24 86,930.43 86,930.43 87,004.06 87,004.06 87,128.96 87,128.96 87,189.06 87,189.06 87,056.14 166,856.14
38 Pile Driver + Hammer Unit/Jam 99,251.69 290,203.73 99,151.38 289,910.43 99,007.14 289,488.71 98,952.73 289,329.59 99,036.54 289,574.66 99,178.71 289,990.35 99,247.12 290,190.37 99,095.82 380,584.16
39 Rock Drill Breaker Unit/Jam 96,468.93 313,299.53 96,371.43 312,982.89 96,231.24 312,527.60 96,178.35 312,355.82 96,259.82 312,620.39 96,398.00 313,069.16 96,464.49 313,285.11 96,317.43 401,096.88
40 Split Form Paver Unit/Jam 204,068.89 204,068.89 203,862.65 203,862.65 203,566.09 203,566.09 203,454.20 203,454.20 203,626.53 203,626.53 203,918.84 203,918.84 204,059.50 204,059.50 203,748.41 390,514.38
41 Stone Crusher Unit/Jam 546,348.07 730,268.06 545,795.90 729,530.01 545,001.95 728,468.78 544,702.39 728,068.38 545,163.76 728,685.07 545,946.35 729,731.10 546,322.93 730,234.44 545,490.07 1,229,144.65
42 Tamper Unit/Jam 81,627.56 81,627.56 81,545.06 81,545.06 81,426.44 81,426.44 81,381.68 81,381.68 81,450.61 81,450.61 81,567.54 81,567.54 81,623.80 81,623.80 81,499.37 156,205.75
43 Tandem Roller 6-8 T Unit/Jam 394,223.99 459,907.64 393,825.57 459,442.83 393,252.68 458,774.49 393,036.53 458,522.33 393,369.44 458,910.70 393,934.13 459,569.48 394,205.85 459,886.47 393,604.89 819,983.27
44 Three Wheel Roller 6-8 T Unit/Jam 130,789.61 193,607.06 130,657.42 193,411.39 130,467.36 193,130.04 130,395.65 193,023.88 130,506.10 193,187.38 130,693.44 193,464.70 130,783.59 193,598.15 130,584.21 313,003.02
45 Tire Roller 8-10 T Unit/Jam 233,751.64 421,749.36 233,515.40 421,323.12 233,175.71 420,710.23 233,047.54 420,478.99 233,244.94 420,835.14 233,579.76 421,439.26 233,740.88 421,729.95 233,384.55 635,018.96
46 Track Loader 75-100 HP Unit/Jam 218,910.26 425,462.77 218,689.02 425,032.77 218,370.90 424,414.48 218,250.87 424,181.21 218,435.74 424,540.50 218,749.30 425,149.93 218,900.19 425,443.18 218,566.48 625,143.55
47 Trailer 20 Ton Unit/Jam 353,410.21 488,024.26 353,053.04 487,531.04 352,539.46 486,821.84 352,345.69 486,554.26 352,644.13 486,966.38 353,150.36 487,665.43 353,393.95 488,001.80 352,855.21 810,702.55
48 Trailler 15 Ton Unit/Jam 306,103.34 464,928.46 305,793.97 464,458.58 305,349.14 463,782.94 305,181.31 463,528.03 305,439.80 463,920.65 305,878.26 464,586.61 306,089.24 464,907.06 305,622.62 744,347.27
49 Truck Mixer (agitator) Unit/Jam 384,948.13 565,344.98 384,559.08 564,773.61 383,999.67 563,952.05 383,788.61 563,642.08 384,113.69 564,119.49 384,665.09 564,929.29 384,930.41 565,318.96 384,343.60 916,765.67
50 Vibrating Rammer Unit/Jam 78,844.80 78,844.80 78,765.11 78,765.11 78,650.54 78,650.54 78,607.31 78,607.31 78,673.89 78,673.89 78,786.83 78,786.83 78,841.17 78,841.17 78,720.98 150,880.56
51 Vibratory Roller 5-8 T Unit/Jam 190,155.10 407,691.05 189,962.92 407,279.02 189,686.59 406,686.56 189,582.33 406,463.03 189,742.91 406,807.30 190,015.28 407,391.28 190,146.35 407,672.28 189,856.48 581,082.72
52 Water Pump 70-100 MM Unit/Jam 59,365.50 59,365.50 59,305.50 59,305.50 59,219.23 59,219.23 59,186.68 59,186.68 59,236.81 59,236.81 59,321.84 59,321.84 59,362.76 59,362.76 59,272.27 113,604.18
53 Water Tanker 3000-4500 L Unit/Jam 215,199.92 231,359.65 214,982.43 231,125.83 214,669.70 230,789.61 214,551.71 230,662.76 214,733.43 230,858.14 215,041.69 231,189.54 215,190.01 231,349.00 214,861.96 427,949.52
54 Welding Set Unit/Jam 120,586.16 120,586.16 120,464.29 120,464.29 120,289.05 120,289.05 120,222.94 120,222.94 120,324.77 120,324.77 120,497.50 120,497.50 120,580.61 120,580.61 120,396.79 230,758.50
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 209,634.41 437,368.15 209,422.54 436,926.12 209,117.90 436,290.53 209,002.96 436,050.73 209,179.98 436,420.07 209,480.26 437,046.56 209,624.76 437,348.01 209,305.19 628,540.87
HARGA SATUAN DASAR BAHAN KABUPATEN PAMEKASAN TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 292,212.06 292,212.06 291,916.73 291,916.73 291,492.09 291,492.09 291,331.87 291,331.87 291,578.63 291,578.63 291,997.20 291,997.20 292,198.61 292,198.61 291,753.16 559,188.67
2 Agregat Pecah Mesin 20-30 mm M3 306,789.52 306,789.52 306,479.47 306,479.47 306,033.64 306,033.64 305,865.43 305,865.43 306,124.50 306,124.50 306,563.95 306,563.95 306,775.40 306,775.40 306,307.73 587,084.69
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 355,775.71 355,775.71 355,416.15 355,416.15 354,899.13 354,899.13 354,704.06 354,704.06 355,004.50 355,004.50 355,514.12 355,514.12 355,759.34 355,759.34 355,216.99 680,826.61
4 Bahan Agr. Base Kelas A M3 316,713.69 316,713.69 316,393.60 316,393.60 315,933.35 315,933.35 315,759.70 315,759.70 316,027.15 316,027.15 316,480.81 316,480.81 316,699.11 316,699.11 316,216.31 606,075.96
5 Bahan Agr. Base Kelas B M3 287,191.23 287,191.23 286,900.98 286,900.98 286,483.63 286,483.63 286,326.17 286,326.17 286,568.69 286,568.69 286,980.07 286,980.07 287,178.01 287,178.01 286,740.22 549,580.61
6 Bahan Agr. Base Kelas C M3 283,174.57 283,174.57 282,888.38 282,888.38 282,476.87 282,476.87 282,321.61 282,321.61 282,560.74 282,560.74 282,966.36 282,966.36 283,161.54 283,161.54 282,729.87 541,894.17
7 Bahan Agr. Base Kelas C2 M3 240,999.64 240,999.64 240,756.07 240,756.07 240,405.85 240,405.85 240,273.71 240,273.71 240,477.22 240,477.22 240,822.43 240,822.43 240,988.54 240,988.54 240,621.16 461,186.53
8 Bahan Agr. Base Kelas S M3 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38 205,530.58 393,930.16
9 Bahan Pilihan M3 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41 138,357.17 265,182.25
10 Bahan Tanah Timbunan M3 112,081.90 112,081.90 111,968.63 111,968.63 111,805.75 111,805.75 111,744.29 111,744.29 111,838.94 111,838.94 111,999.49 111,999.49 112,076.74 112,076.74 111,905.88 214,484.40
11 Batu Belah/Kerakal M3 314,303.69 314,303.69 313,986.04 313,986.04 313,529.29 313,529.29 313,356.96 313,356.96 313,622.38 313,622.38 314,072.59 314,072.59 314,289.22 314,289.22 313,810.10 601,464.10
12 Batu Kali M3 346,436.98 346,436.98 346,086.85 346,086.85 345,583.40 345,583.40 345,393.46 345,393.46 345,686.01 345,686.01 346,182.25 346,182.25 346,421.03 346,421.03 345,892.92 662,955.64
13 Chipping M3 228,949.65 228,949.65 228,718.26 228,718.26 228,385.55 228,385.55 228,260.02 228,260.02 228,453.36 228,453.36 228,781.31 228,781.31 228,939.12 228,939.12 228,590.10 438,127.20
14 Chipping (kg) Kg 283.17 283.17 282.89 282.89 282.48 282.48 282.32 282.32 282.56 282.56 282.97 282.97 283.16 283.16 282.73 541.89
15 Filler Cement Kg 4,079.92 4,079.92 4,075.80 4,075.80 4,069.87 4,069.87 4,067.63 4,067.63 4,071.08 4,071.08 4,076.92 4,076.92 4,079.74 4,079.74 4,073.52 7,807.50
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 370,536.94 370,536.94 370,162.45 370,162.45 369,623.99 369,623.99 369,420.83 369,420.83 369,733.73 369,733.73 370,264.49 370,264.49 370,519.88 370,519.88 369,955.04 709,074.29
18 Kapur M3 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
19 Pasir Beton (Kasar) M3 337,768.02 337,768.02 337,426.65 337,426.65 336,935.80 336,935.80 336,750.61 336,750.61 337,035.84 337,035.84 337,519.66 337,519.66 337,752.47 337,752.47 337,237.58 646,366.37
20 Pasir Halus (untuk HRS) M3 308,278.70 308,278.70 307,967.14 307,967.14 307,519.14 307,519.14 307,350.12 307,350.12 307,610.45 307,610.45 308,052.03 308,052.03 308,264.51 308,264.51 307,794.57 589,934.44
21 Pasir Pasang (Sedang) M3 299,910.99 299,910.99 299,607.89 299,607.89 299,172.05 299,172.05 299,007.62 299,007.62 299,260.88 299,260.88 299,690.47 299,690.47 299,897.19 299,897.19 299,440.00 573,921.66
22 Pasir Urug M3 188,783.05 188,783.05 188,592.25 188,592.25 188,317.91 188,317.91 188,214.41 188,214.41 188,373.83 188,373.83 188,644.24 188,644.24 188,774.36 188,774.36 188,486.58 361,262.78
23 Pasir Urug (ada unsur lempung) M3 164,683.08 164,683.08 164,516.65 164,516.65 164,277.33 164,277.33 164,187.03 164,187.03 164,326.10 164,326.10 164,562.00 164,562.00 164,675.50 164,675.50 164,424.46 315,144.13
24 Sirtu M3 159,662.26 159,662.26 159,500.90 159,500.90 159,268.87 159,268.87 159,181.33 159,181.33 159,316.16 159,316.16 159,544.86 159,544.86 159,654.91 159,654.91 159,411.52 305,536.08
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 64,931.33 163,603.61 64,865.70 163,438.26 64,771.35 163,200.51 64,735.74 163,110.81 64,790.58 163,248.97 64,883.58 163,483.31 64,928.34 163,596.08 64,829.36 222,772.50
26 Anti Pengelupas Liter 103,429.01 103,429.01 103,324.48 103,324.48 103,174.18 103,174.18 103,117.47 103,117.47 103,204.81 103,204.81 103,352.96 103,352.96 103,424.25 103,424.25 103,266.58 197,925.89
27 Arbocell Kg 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
28 Asbuton Curah Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
29 Aspal Emulsi (CRS-1/53 R-65) Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
30 Aspal Emulsi (CSS-1) Kg 12,200.61 12,200.61 12,188.28 12,188.28 12,170.55 12,170.55 12,163.86 12,163.86 12,174.16 12,174.16 12,191.64 12,191.64 12,200.04 12,200.04 12,181.45 23,347.57
31 Aspal Minyak (Drum) Kg 10,493.53 10,493.53 10,482.92 10,482.92 10,467.67 10,467.67 10,461.92 10,461.92 10,470.78 10,470.78 10,485.81 10,485.81 10,493.04 10,493.04 10,477.05 20,080.83
32 Aspal Modifikasi (BNA) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
33 Aspal Modifikasi (JAP-57) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
34 Aspal Modifikasi (Retona) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
35 Aspal Modifikasi (Starbit) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
36 Aspal Minyak (Curah) Kg 9,388.94 9,388.94 9,379.46 9,379.46 9,365.81 9,365.81 9,360.66 9,360.66 9,368.59 9,368.59 9,382.04 9,382.04 9,388.51 9,388.51 9,374.20 17,967.06
37 Assetilline Botol 144,599.78 144,599.78 144,453.64 144,453.64 144,243.51 144,243.51 144,164.23 144,164.23 144,286.33 144,286.33 144,493.46 144,493.46 144,593.13 144,593.13 144,372.70 276,711.92
38 Bahan Pengawet: Kreosot Liter 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
40 Beton B-0 M3 547,275.66 547,275.66 546,722.55 546,722.55 545,927.25 545,927.25 545,627.19 545,627.19 546,089.34 546,089.34 546,873.26 546,873.26 547,250.47 547,250.47 546,416.20 1,047,288.56
41 Beton K-125 (fc' 10 MPa) M3 565,827.38 565,827.38 565,255.52 565,255.52 564,433.26 564,433.26 564,123.02 564,123.02 564,600.84 564,600.84 565,411.33 565,411.33 565,801.33 565,801.33 564,938.78 1,082,789.87
42 Beton K-175 (fc' 15 MPa) M3 612,206.67 612,206.67 611,587.94 611,587.94 610,698.28 610,698.28 610,362.61 610,362.61 610,879.60 610,879.60 611,756.52 611,756.52 612,178.49 612,178.49 611,245.24 1,171,543.14
43 Beton K-250 (fc' 20 MPa) M3 681,775.61 681,775.61 681,086.57 681,086.57 680,095.81 680,095.81 679,722.00 679,722.00 680,297.73 680,297.73 681,274.31 681,274.31 681,744.23 681,744.23 680,704.93 1,304,673.04
44 Beton K-300 (fc' 25 MPa) M3 709,603.19 709,603.19 708,886.02 708,886.02 707,854.82 707,854.82 707,465.76 707,465.76 708,064.99 708,064.99 709,081.43 709,081.43 709,570.52 709,570.52 708,488.80 1,357,925.00
45 Beton K-350 (fc' 30 MPa) M3 737,430.76 737,430.76 736,685.47 736,685.47 735,613.83 735,613.83 735,209.51 735,209.51 735,832.24 735,832.24 736,888.54 736,888.54 737,396.82 737,396.82 736,272.68 1,411,176.96
46 Beton K-400 (fc' 35 MPa) M3 765,258.34 765,258.34 764,484.92 764,484.92 763,372.85 763,372.85 762,953.27 762,953.27 763,599.50 763,599.50 764,695.66 764,695.66 765,223.11 765,223.11 764,056.55 1,464,428.92
47 Beton K-450 (fc' 40 MPa) M3 802,361.77 802,361.77 801,550.86 801,550.86 800,384.86 800,384.86 799,944.94 799,944.94 800,622.50 800,622.50 801,771.81 801,771.81 802,324.84 802,324.84 801,101.72 1,535,431.54
48 Beton K-500 (fc' 45 MPa) M3 834,827.28 834,827.28 833,983.55 833,983.55 832,770.38 832,770.38 832,312.66 832,312.66 833,017.63 833,017.63 834,213.44 834,213.44 834,788.85 834,788.85 833,516.24 1,597,558.83
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48 4,010.35 7,686.44
50 Cat Kg 71,363.00 71,363.00 71,290.88 71,290.88 71,187.18 71,187.18 71,148.05 71,148.05 71,208.31 71,208.31 71,310.53 71,310.53 71,359.72 71,359.72 71,250.93 136,563.10
51 Cat Anti Karat Kg 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
52 Cat Marka (Non Thermoplas) Kg 60,249.91 60,249.91 60,189.02 60,189.02 60,101.46 60,101.46 60,068.43 60,068.43 60,119.31 60,119.31 60,205.61 60,205.61 60,247.14 60,247.14 60,155.29 115,296.63
53 Cat Marka (Thermoplastic) Kg 51,797.85 51,797.85 51,745.50 51,745.50 51,670.23 51,670.23 51,641.83 51,641.83 51,685.57 51,685.57 51,759.76 51,759.76 51,795.47 51,795.47 51,716.51 99,122.44
54 Cerucuk Diameter 10-15 cm M' 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74 23,059.53 44,197.04
55 Cold Mix (Aspal Dingin) Kg 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,210,019.01 1,210,019.01 1,208,796.09 1,208,796.09 1,207,037.68 1,207,037.68 1,206,374.25 1,206,374.25 1,207,396.06 1,207,396.06 1,209,129.30 1,209,129.30 1,209,963.31 1,209,963.31 1,208,118.75 2,315,540.70
57 Curing Compound Liter 46,191.60 46,191.60 46,144.91 46,144.91 46,077.79 46,077.79 46,052.46 46,052.46 46,091.47 46,091.47 46,157.63 46,157.63 46,189.47 46,189.47 46,119.06 88,394.08
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 565,344.98 565,344.98 564,773.61 564,773.61 563,952.05 563,952.05 563,642.08 563,642.08 564,119.49 564,119.49 564,929.29 564,929.29 565,318.96 565,318.96 564,457.14 1,081,866.73
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 658,732.34 658,732.34 658,066.59 658,066.59 657,109.31 657,109.31 656,748.14 656,748.14 657,304.41 657,304.41 658,247.98 658,247.98 658,702.02 658,702.02 657,697.84 1,260,576.52
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 834,461.24 834,461.24 833,617.89 833,617.89 832,405.24 832,405.24 831,947.72 831,947.72 832,652.39 832,652.39 833,847.67 833,847.67 834,422.83 834,422.83 833,150.77 1,596,858.36
61 Kerosen/Minyak Tanah Liter 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 57,471.38 57,471.38 57,413.30 57,413.30 57,329.78 57,329.78 57,298.27 57,298.27 57,346.80 57,346.80 57,429.13 57,429.13 57,468.74 57,468.74 57,381.13 109,979.54
64 Oxygen (Isi 6 M3) Botol 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79 158,408.93 303,614.47
65 Polytene 125 Mikron Kg 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97 25,064.70 48,040.26
66 Sand Sheet Ton 1,280,310.57 1,280,310.57 1,279,016.61 1,279,016.61 1,277,156.06 1,277,156.06 1,276,454.08 1,276,454.08 1,277,535.25 1,277,535.25 1,279,369.17 1,279,369.17 1,280,251.63 1,280,251.63 1,278,299.92 2,450,053.44
67 Seal Coat M2 102,424.85 102,424.85 102,321.33 102,321.33 102,172.48 102,172.48 102,116.33 102,116.33 102,202.82 102,202.82 102,349.53 102,349.53 102,420.13 102,420.13 102,263.99 196,004.28
68 Seal Guard Kg 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
69 Semen/PC (50 kg) Zak 67,279.07 67,279.07 67,211.07 67,211.07 67,113.30 67,113.30 67,076.41 67,076.41 67,133.23 67,133.23 67,229.60 67,229.60 67,275.97 67,275.97 67,173.41 128,747.91
70 Semen/PC (kg) Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24 2,005.18 3,843.22
71 Slurry Seal Ton 37,154.11 37,154.11 37,116.56 37,116.56 37,062.57 37,062.57 37,042.20 37,042.20 37,073.57 37,073.57 37,126.79 37,126.79 37,152.40 37,152.40 37,095.76 71,099.59
72 Solar Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31 11,028.47 21,137.72
73 Thinner Liter 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28 36,093.17 69,177.98
Harga Satuan Dasar per Bulan
Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.0011404562 1.0019884346 1.0034268027 1.0041189267
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
75 Baja Prategang Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14 18,046.59 34,588.99
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78 15,038.82 28,824.16
77 Baja Tulangan (Polos) U25 Kg 14,560.39 14,560.39 14,545.68 14,545.68 14,524.52 14,524.52 14,516.54 14,516.54 14,528.83 14,528.83 14,549.69 14,549.69 14,559.72 14,559.72 14,537.53 27,863.35
78 Baja Tulangan (Polos) U32 Kg 14,560.39 14,560.39 14,545.68 14,545.68 14,524.52 14,524.52 14,516.54 14,516.54 14,528.83 14,528.83 14,549.69 14,549.69 14,559.72 14,559.72 14,537.53 27,863.35
79 Baja Tulangan (Polos) U36 Kg 14,560.39 14,560.39 14,545.68 14,545.68 14,524.52 14,524.52 14,516.54 14,516.54 14,528.83 14,528.83 14,549.69 14,549.69 14,559.72 14,559.72 14,537.53 27,863.35
80 Baja Tulangan (Ulir) D16 Kg 15,045.41 15,045.41 15,030.20 15,030.20 15,008.34 15,008.34 15,000.09 15,000.09 15,012.79 15,012.79 15,034.34 15,034.34 15,044.71 15,044.71 15,021.78 28,791.49
81 Baja Tulangan (Ulir) D19 Kg 15,045.41 15,045.41 15,030.20 15,030.20 15,008.34 15,008.34 15,000.09 15,000.09 15,012.79 15,012.79 15,034.34 15,034.34 15,044.71 15,044.71 15,021.78 28,791.49
82 Baja Tulangan (Ulir) D24 Kg 15,045.41 15,045.41 15,030.20 15,030.20 15,008.34 15,008.34 15,000.09 15,000.09 15,012.79 15,012.79 15,034.34 15,034.34 15,044.71 15,044.71 15,021.78 28,791.49
83 Baja Tulangan (Ulir) D32 Kg 15,045.41 15,045.41 15,030.20 15,030.20 15,008.34 15,008.34 15,000.09 15,000.09 15,012.79 15,012.79 15,034.34 15,034.34 15,044.71 15,044.71 15,021.78 28,791.49
84 Baja Tulangan (Ulir) D36 Kg 15,045.41 15,045.41 15,030.20 15,030.20 15,008.34 15,008.34 15,000.09 15,000.09 15,012.79 15,012.79 15,034.34 15,034.34 15,044.71 15,044.71 15,021.78 28,791.49
85 Besi Beton Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19 10,025.88 19,216.11
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 12,059,019.30 12,059,019.30 12,046,831.75 12,046,831.75 12,029,307.52 12,029,307.52 12,022,695.74 12,022,695.74 12,032,879.11 12,032,879.11 12,050,152.47 12,050,152.47 12,058,464.19 12,058,464.19 12,040,081.41 23,076,620.99
87 Box Culvert Type DUB 200×200 M' 12,801,097.34 12,801,097.34 12,788,159.81 12,788,159.81 12,769,557.18 12,769,557.18 12,762,538.54 12,762,538.54 12,773,348.56 12,773,348.56 12,791,684.88 12,791,684.88 12,800,508.08 12,800,508.08 12,780,994.07 24,496,691.18
88 Box Culvert Type uk 300×200 M' 13,821,329.14 13,821,329.14 13,807,360.50 13,807,360.50 13,787,275.26 13,787,275.26 13,779,697.24 13,779,697.24 13,791,368.81 13,791,368.81 13,811,166.51 13,811,166.51 13,820,692.91 13,820,692.91 13,799,623.66 26,449,047.49
89 Casing M2 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43 12,031.06 23,059.33
90 Ducting (Kabel Prestress) M' 179,745.56 179,745.56 179,563.90 179,563.90 179,302.69 179,302.69 179,204.14 179,204.14 179,355.93 179,355.93 179,613.40 179,613.40 179,737.29 179,737.29 179,463.28 343,968.29
91 Ducting (Strand Prestress) M' 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55 156,403.76 299,771.24
92 Expansion Cap M2 9,037.49 9,037.49 9,028.35 9,028.35 9,015.22 9,015.22 9,010.26 9,010.26 9,017.90 9,017.90 9,030.84 9,030.84 9,037.07 9,037.07 9,023.29 17,294.49
93 Expansion Join Baja Siku M' 2,018,371.95 2,018,371.95 2,016,332.07 2,016,332.07 2,013,398.96 2,013,398.96 2,012,292.32 2,012,292.32 2,013,996.75 2,013,996.75 2,016,887.87 2,016,887.87 2,018,279.04 2,018,279.04 2,015,202.23 3,862,437.19
94 Expansion Join Tipe Rubber M' 1,461,060.29 1,461,060.29 1,459,583.66 1,459,583.66 1,457,460.44 1,457,460.44 1,456,659.36 1,456,659.36 1,457,893.17 1,457,893.17 1,459,986.00 1,459,986.00 1,460,993.04 1,460,993.04 1,458,765.80 2,795,943.34
95 Expansion Join Tipe Torma M' 1,675,951.64 1,675,951.64 1,674,257.82 1,674,257.82 1,671,822.32 1,671,822.32 1,670,903.42 1,670,903.42 1,672,318.70 1,672,318.70 1,674,719.33 1,674,719.33 1,675,874.49 1,675,874.49 1,673,319.67 3,207,167.99
96 Expansion Tipe Joint Asphaltic Plug M' 1,988,247.00 1,988,247.00 1,986,237.56 1,986,237.56 1,983,348.23 1,983,348.23 1,982,258.10 1,982,258.10 1,983,937.10 1,983,937.10 1,986,785.07 1,986,785.07 1,988,155.47 1,988,155.47 1,985,124.59 3,804,788.87
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 38,158.28 38,158.28 38,119.71 38,119.71 38,064.26 38,064.26 38,043.34 38,043.34 38,075.56 38,075.56 38,130.22 38,130.22 38,156.52 38,156.52 38,098.35 73,021.20
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 30,124.95 30,124.95 30,094.51 30,094.51 30,050.73 30,050.73 30,034.21 30,034.21 30,059.65 30,059.65 30,102.80 30,102.80 30,123.57 30,123.57 30,077.65 57,648.32
99 Glass Bead Kg 63,262.40 63,262.40 63,198.47 63,198.47 63,106.53 63,106.53 63,071.85 63,071.85 63,125.27 63,125.27 63,215.89 63,215.89 63,259.49 63,259.49 63,163.06 121,061.46
100 Joint Sealent Kg 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
101 Joint Socket Pile 16×16×16 Set 84,349.87 84,349.87 84,264.62 84,264.62 84,142.05 84,142.05 84,095.80 84,095.80 84,167.03 84,167.03 84,287.85 84,287.85 84,345.99 84,345.99 84,217.41 161,415.29
102 Joint Socket Pile 35×35 Set 725,007.24 725,007.24 724,274.50 724,274.50 723,220.92 723,220.92 722,823.41 722,823.41 723,435.65 723,435.65 724,474.15 724,474.15 724,973.87 724,973.87 723,868.66 1,387,402.81
103 Kawat Beton Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
104 Kawat Bronjong Kg 28,116.62 28,116.62 28,088.21 28,088.21 28,047.35 28,047.35 28,031.93 28,031.93 28,055.68 28,055.68 28,095.95 28,095.95 28,115.33 28,115.33 28,072.47 53,805.10
105 Kawat Las Dos 140,583.12 140,583.12 140,441.04 140,441.04 140,236.74 140,236.74 140,159.66 140,159.66 140,278.38 140,278.38 140,479.75 140,479.75 140,576.65 140,576.65 140,362.34 269,025.48
106 Kayu Acuan (Kelas III/Meranti) M3 3,988,543.98 3,988,543.98 3,984,512.93 3,984,512.93 3,978,716.75 3,978,716.75 3,976,529.89 3,976,529.89 3,979,898.06 3,979,898.06 3,985,611.26 3,985,611.26 3,988,360.38 3,988,360.38 3,982,280.24 7,632,637.07
107 Kayu Perancah (Gelam) M3 2,569,412.85 2,569,412.85 2,566,816.05 2,566,816.05 2,563,082.16 2,563,082.16 2,561,673.39 2,561,673.39 2,563,843.16 2,563,843.16 2,567,523.60 2,567,523.60 2,569,294.57 2,569,294.57 2,565,377.76 4,916,931.05
108 Kerb Pracetak Type 1 (Peninggi) Buah 51,212.42 51,212.42 51,160.66 51,160.66 51,086.24 51,086.24 51,058.16 51,058.16 51,101.41 51,101.41 51,174.77 51,174.77 51,210.07 51,210.07 51,132.00 98,002.14
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
110 Marmer Nama Jembatan Buah 556,307.49 556,307.49 555,745.26 555,745.26 554,936.83 554,936.83 554,631.81 554,631.81 555,101.59 555,101.59 555,898.45 555,898.45 556,281.89 556,281.89 555,433.85 1,064,572.24
111 Mata Kucing Buah 145,603.95 145,603.95 145,456.79 145,456.79 145,245.20 145,245.20 145,165.37 145,165.37 145,288.32 145,288.32 145,496.89 145,496.89 145,597.24 145,597.24 145,375.29 278,633.53
112 Matras Concrete (Tebal=10 cm) M2 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06 135,349.40 259,417.42
113 Mini Pile 16×16×16 M' 125,520.64 125,520.64 125,393.79 125,393.79 125,211.38 125,211.38 125,142.56 125,142.56 125,248.55 125,248.55 125,428.35 125,428.35 125,514.87 125,514.87 125,323.52 240,201.32
114 Mini Timber Pile Buah 29,120.79 29,120.79 29,091.36 29,091.36 29,049.04 29,049.04 29,033.07 29,033.07 29,057.66 29,057.66 29,099.38 29,099.38 29,119.45 29,119.45 29,075.06 55,726.71
115 Multipleks 12 mm Lbr 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41 180,465.87 345,889.90
116 Paku Kg 20,718.94 20,718.94 20,698.00 20,698.00 20,667.89 20,667.89 20,656.53 20,656.53 20,674.03 20,674.03 20,703.71 20,703.71 20,717.99 20,717.99 20,686.40 39,648.59
117 Paving Block (Model Bata 8 cm) M2 88,366.53 88,366.53 88,277.22 88,277.22 88,148.81 88,148.81 88,100.36 88,100.36 88,174.98 88,174.98 88,301.56 88,301.56 88,362.47 88,362.47 88,227.76 169,101.73
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 61,664,777.75 61,664,777.75 61,602,455.75 61,602,455.75 61,512,844.14 61,512,844.14 61,479,034.28 61,479,034.28 61,531,107.78 61,531,107.78 61,619,436.53 61,619,436.53 61,661,939.17 61,661,939.17 61,567,937.33 118,004,181.73
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 87,358,351.46 87,358,351.46 87,270,062.04 87,270,062.04 87,143,112.39 87,143,112.39 87,095,215.13 87,095,215.13 87,168,985.85 87,168,985.85 87,294,118.13 87,294,118.13 87,354,330.15 87,354,330.15 87,221,161.00 167,172,430.66
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 166,965,552.12 166,965,552.12 166,796,807.05 166,796,807.05 166,554,171.75 166,554,171.75 166,462,627.08 166,462,627.08 166,603,622.98 166,603,622.98 166,842,784.77 166,842,784.77 166,957,866.30 166,957,866.30 166,703,343.86 319,511,949.54
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 218,949,173.65 218,949,173.65 218,727,890.92 218,727,890.92 218,409,712.72 218,409,712.72 218,289,666.21 218,289,666.21 218,474,560.26 218,474,560.26 218,788,183.49 218,788,183.49 218,939,094.89 218,939,094.89 218,605,328.58 418,989,884.05
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 279,101,678.67 279,101,678.67 278,819,602.34 278,819,602.34 278,414,010.18 278,414,010.18 278,260,982.96 278,260,982.96 278,496,673.46 278,496,673.46 278,896,459.25 278,896,459.25 279,088,830.96 279,088,830.96 278,663,368.12 534,100,120.31
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 336,735,737.51 336,735,737.51 336,395,412.85 336,395,412.85 335,906,066.54 335,906,066.54 335,721,439.45 335,721,439.45 336,005,799.66 336,005,799.66 336,488,140.59 336,488,140.59 336,720,236.75 336,720,236.75 336,206,916.50 644,390,957.33
124 Pelat Rambu (Eng. Grade) Buah 194,808.04 194,808.04 194,611.15 194,611.15 194,328.06 194,328.06 194,221.25 194,221.25 194,385.76 194,385.76 194,664.80 194,664.80 194,799.07 194,799.07 194,502.11 372,792.45
125 Pelat Rambu (High L Grade) Buah 226,941.32 226,941.32 226,711.96 226,711.96 226,382.17 226,382.17 226,257.74 226,257.74 226,449.39 226,449.39 226,774.46 226,774.46 226,930.88 226,930.88 226,584.93 434,283.98
126 Pemantul Cahaya (Reflector) Buah 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55 13,033.65 24,980.94
127 Pipa Baja D10" Kg 21,087.47 21,087.47 21,066.16 21,066.16 21,035.51 21,035.51 21,023.95 21,023.95 21,041.76 21,041.76 21,071.96 21,071.96 21,086.50 21,086.50 21,054.35 40,353.82
128 Pipa Drainase Baja Dia 3" M' 687,853.13 687,853.13 687,157.94 687,157.94 686,158.35 686,158.35 685,781.21 685,781.21 686,362.08 686,362.08 687,347.36 687,347.36 687,821.46 687,821.46 686,772.90 1,316,303.22
129 Pipa Galvanis Dia 1,5" M' 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46 315,815.28 605,307.32
130 Pipa Galvanis Dia 2" M' 451,874.32 451,874.32 451,417.63 451,417.63 450,760.96 450,760.96 450,513.21 450,513.21 450,894.80 450,894.80 451,542.06 451,542.06 451,853.52 451,853.52 451,164.68 864,724.74
131 Pipa Galvanis Dia 3" M' 223,548.19 582,415.79 223,322.26 581,827.16 222,997.40 580,980.79 222,874.83 580,661.46 223,063.61 581,153.29 223,383.82 581,987.55 223,537.90 582,388.98 223,197.13 786,094.77
132 Pipa Porus M' 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99 42,108.70 80,707.64
133 Pipa PVC Dia 4" M' 277,149.58 277,149.58 276,869.48 276,869.48 276,466.72 276,466.72 276,314.77 276,314.77 276,548.81 276,548.81 276,945.80 276,945.80 277,136.82 277,136.82 276,714.34 530,364.51
134 Plastik Filter M2 33,137.45 33,137.45 33,103.96 33,103.96 33,055.80 33,055.80 33,037.64 33,037.64 33,065.62 33,065.62 33,113.08 33,113.08 33,135.92 33,135.92 33,085.41 63,413.15
135 Rel Pengaman M' 157,653.93 157,653.93 157,494.59 157,494.59 157,265.49 157,265.49 157,179.05 157,179.05 157,312.18 157,312.18 157,538.01 157,538.01 157,646.67 157,646.67 157,406.34 301,692.85
136 Saluran U Tipe DS 1 (80×80×120) Buah 1,904,901.29 1,904,901.29 1,902,976.09 1,902,976.09 1,900,207.87 1,900,207.87 1,899,163.45 1,899,163.45 1,900,772.06 1,900,772.06 1,903,500.64 1,903,500.64 1,904,813.60 1,904,813.60 1,901,909.77 3,645,295.20
137 Strip Bearing Buah 292,212.06 292,212.06 291,916.73 291,916.73 291,492.09 291,492.09 291,331.87 291,331.87 291,578.63 291,578.63 291,997.20 291,997.20 292,198.61 292,198.61 291,753.16 559,188.67
138 Tiang Pancang Baja Diameter 400 M' 674,798.98 674,798.98 674,116.99 674,116.99 673,136.37 673,136.37 672,766.39 672,766.39 673,336.23 673,336.23 674,302.81 674,302.81 674,767.92 674,767.92 673,739.25 1,291,322.28
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 825,423.75 825,423.75 824,589.53 824,589.53 823,390.02 823,390.02 822,937.46 822,937.46 823,634.49 823,634.49 824,816.83 824,816.83 825,385.76 825,385.76 824,127.48 1,579,563.86
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,725,155.73 1,725,155.73 1,723,412.19 1,723,412.19 1,720,905.18 1,720,905.18 1,719,959.30 1,719,959.30 1,721,416.13 1,721,416.13 1,723,887.25 1,723,887.25 1,725,076.32 1,725,076.32 1,722,446.49 3,301,326.91
HARGA SATUAN DASAR UPAH KABUPATEN SUMENEP TA. 2019 / 2020

Oct-19 Nov-19 Dec-19


No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231
Min Max Min Max Min Max Min
1 Pekerja OH 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91
2 Tukang OH 135,000 135,000 135,365.26 135,365.26 135,551.88 135,551.88 135,555.65
3 Mandor OH 155,000 155,000 155,419.38 155,419.38 155,633.64 155,633.64 155,637.97
4 Operator OH 320,000 320,000 320,865.81 320,865.81 321,308.15 321,308.15 321,317.10
5 Pembantu Operator OH 200,000 200,000 200,541.13 200,541.13 200,817.59 200,817.59 200,823.18
6 Sopir OH 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39
7 Pembantu Sopir OH 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07
8 Mekanik OH 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87
9 Pembantu Mekanik OH 130,000 130,000 130,351.73 130,351.73 130,531.44 130,531.44 130,535.07
10 Kepala Tukang OH 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39
11 Pemasak Aspal OH 150,000 150,000 150,405.85 150,405.85 150,613.20 150,613.20 150,617.39

HARGA SATUAN DASAR ALAT KABUPATEN SUMENEP TA. 2019 / 2020

Oct-19 Nov-19 Dec-19


No Jenis Alat Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231
Min Max Min Max Min Max Min
1 Aggregat (Chip) Spreader Unit/Jam 471,386 526,000 472,661.12 527,423.17 473,312.72 528,150.27 473,325.90
2 Asphalt Distribution Unit/Jam 290,237 373,000 291,022.77 374,009.21 291,423.97 374,524.81 291,432.08
3 Asphalt Finisher Unit/Jam 213,174 1,011,000 213,751.21 1,013,735.42 214,045.88 1,015,132.94 214,051.84
4 Asphalt Liquid Mixer Unit/Jam 76,062 139,000 76,268.04 139,376.09 76,373.18 139,568.23 76,375.30
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,084 102,084 102,359.73 102,359.73 102,500.84 102,500.84 102,503.70
6 Asphalt Mixing Plant Unit/Jam 1,140,934 5,980,975 1,144,020.54 5,997,157.18 1,145,597.67 6,005,424.79 1,145,629.56
7 Asphalt Sprayer Unit/Jam 94,077 94,077 94,331.52 94,331.52 94,461.56 94,461.56 94,464.19
8 Asphalt Tanker Unit/Jam 440,360 510,000 441,551.79 511,379.88 442,160.50 512,084.87 442,172.81
9 Blending Equipment Unit/Jam 143,117 226,000 143,504.33 226,611.48 143,702.16 226,923.88 143,706.16
10 Bore Pile Machine Unit/Jam 394,323 686,000 395,389.55 687,856.08 395,934.63 688,804.35 395,945.65
11 Bore Pile Machine Dia 60 Unit/Jam 258,211 781,000 258,909.91 783,113.12 259,266.84 784,192.71 259,274.06
12 Bore Pile Machine Dia 80 Unit/Jam 1,020,835 1,020,835 1,023,597.32 1,023,597.32 1,025,008.44 1,025,008.44 1,025,036.97
13 Bulldozer 100-150 HP Unit/Jam 400,328 580,000 401,410.71 581,569.28 401,964.09 582,371.02 401,975.28
14 Cement Tanker Unit/Jam 372,305 480,000 373,311.96 481,298.71 373,826.61 481,962.23 373,837.01
15 Cold Milling Unit/Jam 581,476 1,237,000 583,049.06 1,240,346.89 583,852.85 1,242,056.82 583,869.10
HARGA SATUAN DASAR UPAH KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Dec-19 Jan-20 Feb-20 Mar-20
No Jenis Upah Satuan
1.0041159231 1.0027897387 1.0013573407 1.0011405724
Max Min Max Min Max Min Max
1 Pekerja OH 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87
2 Tukang OH 135,555.65 135,376.61 135,376.61 135,183.24 135,183.24 135,153.98 135,153.98
3 Mandor OH 155,637.97 155,432.41 155,432.41 155,210.39 155,210.39 155,176.79 155,176.79
4 Operator OH 321,317.10 320,892.72 320,892.72 320,434.35 320,434.35 320,364.98 320,364.98
5 Pembantu Operator OH 200,823.18 200,557.95 200,557.95 200,271.47 200,271.47 200,228.11 200,228.11
6 Sopir OH 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09
7 Pembantu Sopir OH 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27
8 Mekanik OH 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30
9 Pembantu Mekanik OH 130,535.07 130,362.67 130,362.67 130,176.45 130,176.45 130,148.27 130,148.27
10 Kepala Tukang OH 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09
11 Pemasak Aspal OH 150,617.39 150,418.46 150,418.46 150,203.60 150,203.60 150,171.09 150,171.09

HARGA SATUAN DASAR ALAT KABUPATEN SUMENEP TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Dec-19 Jan-20 Feb-20 Mar-20
No Jenis Alat Satuan
1.0041159231 1.0027897387 1.0013573407 1.0011405724
Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 528,164.98 472,700.75 527,467.40 472,025.54 526,713.96 471,923.36 526,599.94
2 Asphalt Distribution Unit/Jam 374,535.24 291,047.17 374,040.57 290,631.44 373,506.29 290,568.52 373,425.43
3 Asphalt Finisher Unit/Jam 1,015,161.20 213,769.13 1,013,820.43 213,463.78 1,012,372.27 213,417.57 1,012,153.12
4 Asphalt Liquid Mixer Unit/Jam 139,572.11 76,274.43 139,387.77 76,165.48 139,188.67 76,148.99 139,158.54
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,503.70 102,368.32 102,368.32 102,222.09 102,222.09 102,199.96 102,199.96
6 Asphalt Mixing Plant Unit/Jam 6,005,591.97 1,144,116.47 5,997,660.09 1,142,482.20 5,989,092.96 1,142,234.88 5,987,796.47
7 Asphalt Sprayer Unit/Jam 94,464.19 94,339.43 94,339.43 94,204.67 94,204.67 94,184.28 94,184.28
8 Asphalt Tanker Unit/Jam 512,099.12 441,588.81 511,422.77 440,958.04 510,692.24 440,862.59 510,581.69
9 Blending Equipment Unit/Jam 226,930.20 143,516.36 226,630.48 143,311.36 226,306.76 143,280.34 226,257.77
10 Bore Pile Machine Unit/Jam 688,823.52 395,422.71 687,913.76 394,857.88 686,931.14 394,772.41 686,782.43
11 Bore Pile Machine Dia 60 Unit/Jam 784,214.54 258,931.62 783,178.79 258,561.76 782,060.08 258,505.79 781,890.79
12 Bore Pile Machine Dia 80 Unit/Jam 1,025,036.97 1,023,683.16 1,023,683.16 1,022,220.92 1,022,220.92 1,021,999.63 1,021,999.63
13 Bulldozer 100-150 HP Unit/Jam 582,387.24 401,444.38 581,618.05 400,870.95 580,787.26 400,784.17 580,661.53
14 Cement Tanker Unit/Jam 481,975.64 373,343.27 481,339.07 372,809.98 480,651.52 372,729.28 480,547.47
15 Cold Milling Unit/Jam 1,242,091.40 583,097.96 1,240,450.91 582,265.05 1,238,679.03 582,139.01 1,238,410.89
HARGA SATUAN DASAR UPAH KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Apr-20 May-20
No Jenis Upah Satuan
1.0023158394 1.0037735472
Min Max Min Max
1 Pekerja OH 120,277.90 120,277.90 120,452.83 120,452.83
2 Tukang OH 135,312.64 135,312.64 135,509.43 135,509.43
3 Mandor OH 155,358.96 155,358.96 155,584.90 155,584.90
4 Operator OH 320,741.07 320,741.07 321,207.54 321,207.54
5 Pembantu Operator OH 200,463.17 200,463.17 200,754.71 200,754.71
6 Sopir OH 150,347.38 150,347.38 150,566.03 150,566.03
7 Pembantu Sopir OH 130,301.06 130,301.06 130,490.56 130,490.56
8 Mekanik OH 180,416.85 180,416.85 180,679.24 180,679.24
9 Pembantu Mekanik OH 130,301.06 130,301.06 130,490.56 130,490.56
10 Kepala Tukang OH 150,347.38 150,347.38 150,566.03 150,566.03
11 Pemasak Aspal OH 150,347.38 150,347.38 150,566.03 150,566.03

HARGA SATUAN DASAR ALAT KABUPATEN SUMENEP TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Apr-20 May-20
No Jenis Alat Satuan
1.0023158394 1.0037735472
Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 472,477.36 527,218.13 473,164.51 527,984.89
2 Asphalt Distribution Unit/Jam 290,909.63 373,863.81 291,332.71 374,407.53
3 Asphalt Finisher Unit/Jam 213,668.11 1,013,341.31 213,978.85 1,014,815.06
4 Asphalt Liquid Mixer Unit/Jam 76,238.39 139,321.90 76,349.26 139,524.52
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,319.94 102,319.94 102,468.75 102,468.75
6 Asphalt Mixing Plant Unit/Jam 1,143,575.78 5,994,825.71 1,145,238.93 6,003,544.23
7 Asphalt Sprayer Unit/Jam 94,294.85 94,294.85 94,431.98 94,431.98
8 Asphalt Tanker Unit/Jam 441,380.13 511,181.08 442,022.04 511,924.51
9 Blending Equipment Unit/Jam 143,448.54 226,523.38 143,657.16 226,852.82
10 Bore Pile Machine Unit/Jam 395,235.84 687,588.67 395,810.65 688,588.65
11 Bore Pile Machine Dia 60 Unit/Jam 258,809.26 782,808.67 259,185.65 783,947.14
12 Bore Pile Machine Dia 80 Unit/Jam 1,023,199.39 1,023,199.39 1,024,687.47 1,024,687.47
13 Bulldozer 100-150 HP Unit/Jam 401,254.66 581,343.19 401,838.22 582,188.66
14 Cement Tanker Unit/Jam 373,166.83 481,111.60 373,709.55 481,811.30
15 Cold Milling Unit/Jam 582,822.40 1,239,864.69 583,670.02 1,241,667.88
16 Cold Recycler Unit/Jam 4,897,007 4,897,007 4,910,256.56 4,910,256.56 4,917,025.79 4,917,025.79 4,917,162.66
17 Compressor 4000-6500 L\M Unit/Jam 149,122 149,122 149,525.49 149,525.49 149,731.63 149,731.63 149,735.79
18 Concrete Breaker Unit/Jam 543,445 1,036,000 544,915.04 1,038,803.06 545,666.26 1,040,235.14 545,681.45
19 Concrete Mixer (350) Unit/Jam 101,083 101,083 101,356.21 101,356.21 101,495.93 101,495.93 101,498.76
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,094 115,094 115,405.58 115,405.58 115,564.68 115,564.68 115,567.89
21 Concrete Pan Mixer Unit/Jam 306,251 656,000 307,079.20 657,774.91 307,502.53 658,681.71 307,511.09
22 Concrete Pump Unit/Jam 233,191 250,000 233,821.74 250,676.41 234,144.09 251,021.99 234,150.60
23 Concrete Vibrator Unit/Jam 87,071 87,071 87,306.83 87,306.83 87,427.19 87,427.19 87,429.62
24 Crane 10-15 Ton Unit/Jam 312,256 312,256 313,100.36 313,100.36 313,531.99 313,531.99 313,540.72
25 Crane On Track 35 Ton Unit/Jam 259,212 492,000 259,913.44 493,331.18 260,271.75 494,011.28 260,279.00
26 Crane On Track 75-100 Ton Unit/Jam 407,333 618,000 408,435.40 619,672.09 408,998.47 620,526.37 409,009.85
27 Dump Truck 10 Ton Unit/Jam 385,315 414,000 386,357.81 415,120.14 386,890.44 415,692.42 386,901.21
28 Dump Truck 3-4 M3 Unit/Jam 210,172 213,000 210,740.63 213,576.30 211,031.15 213,870.74 211,037.02
29 Excavator 80-140 HP Unit/Jam 304,249 483,000 305,072.14 484,306.83 305,492.71 484,974.49 305,501.22
30 Flat Bed Truck 3-4 M3 Unit/Jam 369,302 493,000 370,301.38 494,333.89 370,811.88 495,015.37 370,822.20
31 Fulvi Mixer Unit/Jam 924,757 1,444,000 927,258.75 1,447,906.96 928,537.06 1,449,903.03 928,562.91
32 Generator Set Unit/Jam 411,337 436,000 412,449.51 437,179.66 413,018.11 437,782.36 413,029.60
33 Hot Recycler Unit/Jam 3,021,472 8,860,000 3,029,647.37 8,883,972.09 3,033,824.00 8,896,219.43 3,033,908.46
34 Jack Hammer Unit/Jam 57,047 57,047 57,201.03 57,201.03 57,279.88 57,279.88 57,281.48
35 Launching Gantry Unit/Jam 72,598,403 72,598,403 72,794,829.53 72,794,829.53 72,895,183.64 72,895,183.64 72,897,212.86
36 Motor Grader > 100 HP Unit/Jam 285,233 479,000 286,005.13 480,296.01 286,399.42 480,958.14 286,407.39
37 Pedestrian Roller Unit/Jam 94,077 94,077 94,331.52 94,331.52 94,461.56 94,461.56 94,464.19
38 Pile Driver + Hammer Unit/Jam 107,088 313,000 107,377.37 313,846.87 107,525.40 314,279.54 107,528.39
39 Rock Drill Breaker Unit/Jam 104,085 338,000 104,366.79 338,914.51 104,510.66 339,381.73 104,513.57
40 Split Form Paver Unit/Jam 220,180 220,180 220,775.89 220,775.89 221,080.25 221,080.25 221,086.41
41 Stone Crusher Unit/Jam 589,482 735,000 591,077.28 736,988.66 591,892.13 738,004.66 591,908.61
42 Tamper Unit/Jam 88,072 88,072 88,310.36 88,310.36 88,432.10 88,432.10 88,434.56
43 Tandem Roller 6-8 T Unit/Jam 425,348 496,000 426,498.88 497,342.00 427,086.85 498,027.63 427,098.74
44 Three Wheel Roller 6-8 T Unit/Jam 141,115 178,000 141,497.28 178,481.61 141,692.34 178,727.66 141,696.29
45 Tire Roller 8-10 T Unit/Jam 252,206 455,000 252,888.75 456,231.07 253,237.38 456,860.03 253,244.43
46 Track Loader 75-100 HP Unit/Jam 236,193 311,000 236,832.32 311,841.46 237,158.82 312,271.36 237,165.42
47 Trailer 20 Ton Unit/Jam 381,312 527,000 382,343.71 528,425.88 382,870.80 529,154.36 382,881.46
48 Trailler 15 Ton Unit/Jam 330,270 502,000 331,163.84 503,358.24 331,620.38 504,052.16 331,629.61
49 Truck Mixer (agitator) Unit/Jam 415,340 610,000 416,463.62 611,650.45 417,037.75 612,493.66 417,049.36
50 Vibrating Rammer Unit/Jam 85,070 85,070 85,299.78 85,299.78 85,417.37 85,417.37 85,419.75
51 Vibratory Roller 5-8 T Unit/Jam 205,168 440,000 205,722.99 441,190.49 206,006.60 441,798.71 206,012.33
52 Water Pump 70-100 MM Unit/Jam 64,052 64,052 64,225.71 64,225.71 64,314.26 64,314.26 64,316.05
16 Cold Recycler Unit/Jam 4,917,162.66 4,910,668.33 4,910,668.33 4,903,653.87 4,903,653.87 4,902,592.35 4,902,592.35
17 Compressor 4000-6500 L\M Unit/Jam 149,735.79 149,538.03 149,538.03 149,324.43 149,324.43 149,292.10 149,292.10
18 Concrete Breaker Unit/Jam 1,040,264.10 544,960.74 1,038,890.17 544,182.31 1,037,406.20 544,064.51 1,037,181.63
19 Concrete Mixer (350) Unit/Jam 101,498.76 101,364.70 101,364.70 101,219.91 101,219.91 101,198.00 101,198.00
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,567.89 115,415.26 115,415.26 115,250.40 115,250.40 115,225.45 115,225.45
21 Concrete Pan Mixer Unit/Jam 658,700.05 307,104.95 657,830.07 306,666.27 656,890.42 306,599.89 656,748.22
22 Concrete Pump Unit/Jam 251,028.98 233,841.35 250,697.43 233,507.33 250,339.34 233,456.78 250,285.14
23 Concrete Vibrator Unit/Jam 87,429.62 87,314.15 87,314.15 87,189.43 87,189.43 87,170.56 87,170.56
24 Crane 10-15 Ton Unit/Jam 313,540.72 313,126.61 313,126.61 312,679.34 312,679.34 312,611.65 312,611.65
25 Crane On Track 35 Ton Unit/Jam 494,025.03 259,935.23 493,372.55 259,563.94 492,667.81 259,507.75 492,561.16
26 Crane On Track 75-100 Ton Unit/Jam 620,543.64 408,469.65 619,724.06 407,886.19 618,838.84 407,797.89 618,704.87
27 Dump Truck 10 Ton Unit/Jam 415,703.99 386,390.21 415,154.95 385,838.29 414,561.94 385,754.76 414,472.20
28 Dump Truck 3-4 M3 Unit/Jam 213,876.69 210,758.30 213,594.21 210,457.25 213,289.11 210,411.69 213,242.94
29 Excavator 80-140 HP Unit/Jam 484,987.99 305,097.73 484,347.44 304,661.92 483,655.60 304,595.97 483,550.90
30 Flat Bed Truck 3-4 M3 Unit/Jam 495,029.15 370,332.44 494,375.34 369,803.45 493,669.17 369,723.40 493,562.30
31 Fulvi Mixer Unit/Jam 1,449,943.39 927,336.51 1,448,028.38 926,011.89 1,445,960.00 925,811.43 1,445,646.99
32 Generator Set Unit/Jam 437,794.54 412,484.10 437,216.33 411,894.90 436,591.80 411,805.73 436,497.29
33 Hot Recycler Unit/Jam 8,896,467.08 3,029,901.43 8,884,717.09 3,025,573.48 8,872,026.04 3,024,918.52 8,870,105.47
34 Jack Hammer Unit/Jam 57,281.48 57,205.82 57,205.82 57,124.11 57,124.11 57,111.74 57,111.74
35 Launching Gantry Unit/Jam 72,897,212.86 72,800,934.00 72,800,934.00 72,696,944.19 72,696,944.19 72,681,207.16 72,681,207.16
36 Motor Grader > 100 HP Unit/Jam 480,971.53 286,029.12 480,336.28 285,620.55 479,650.17 285,558.72 479,546.33
37 Pedestrian Roller Unit/Jam 94,464.19 94,339.43 94,339.43 94,204.67 94,204.67 94,184.28 94,184.28
38 Pile Driver + Hammer Unit/Jam 314,288.28 107,386.37 313,873.19 107,232.98 313,424.85 107,209.77 313,357.00
39 Rock Drill Breaker Unit/Jam 339,391.18 104,375.54 338,942.93 104,226.45 338,458.78 104,203.88 338,385.51
40 Split Form Paver Unit/Jam 221,086.41 220,794.41 220,794.41 220,479.02 220,479.02 220,431.29 220,431.29
41 Stone Crusher Unit/Jam 738,025.20 591,126.84 737,050.46 590,282.47 735,997.65 590,154.69 735,838.32
42 Tamper Unit/Jam 88,434.56 88,317.76 88,317.76 88,191.61 88,191.61 88,172.52 88,172.52
43 Tandem Roller 6-8 T Unit/Jam 498,041.50 426,534.65 497,383.71 425,925.38 496,673.24 425,833.18 496,565.72
44 Three Wheel Roller 6-8 T Unit/Jam 178,732.63 141,509.14 178,496.57 141,307.01 178,241.61 141,276.42 178,203.02
45 Tire Roller 8-10 T Unit/Jam 456,872.74 252,909.96 456,269.33 252,548.70 455,617.59 252,494.03 455,518.96
46 Track Loader 75-100 HP Unit/Jam 312,280.05 236,852.18 311,867.61 236,513.86 311,422.13 236,462.66 311,354.72
47 Trailer 20 Ton Unit/Jam 529,169.09 382,375.77 528,470.19 381,829.58 527,715.32 381,746.92 527,601.08
48 Trailler 15 Ton Unit/Jam 504,066.19 331,191.61 503,400.45 330,718.53 502,681.39 330,646.94 502,572.57
49 Truck Mixer (agitator) Unit/Jam 612,510.71 416,498.54 611,701.74 415,903.61 610,827.98 415,813.58 610,695.75
50 Vibrating Rammer Unit/Jam 85,419.75 85,306.93 85,306.93 85,185.08 85,185.08 85,166.64 85,166.64
51 Vibratory Roller 5-8 T Unit/Jam 441,811.01 205,740.24 441,227.49 205,446.36 440,597.23 205,401.89 440,501.85
52 Water Pump 70-100 MM Unit/Jam 64,316.05 64,231.10 64,231.10 64,139.35 64,139.35 64,125.47 64,125.47
16 Cold Recycler Unit/Jam 4,908,347.64 4,908,347.64 4,915,486.05 4,915,486.05
17 Compressor 4000-6500 L\M Unit/Jam 149,467.36 149,467.36 149,684.74 149,684.74
18 Concrete Breaker Unit/Jam 544,703.20 1,038,399.21 545,495.39 1,039,909.39
19 Concrete Mixer (350) Unit/Jam 101,316.80 101,316.80 101,464.15 101,464.15
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,360.72 115,360.72 115,528.49 115,528.49
21 Concrete Pan Mixer Unit/Jam 306,959.82 657,519.19 307,406.24 658,475.45
22 Concrete Pump Unit/Jam 233,730.84 250,578.96 234,070.76 250,943.39
23 Concrete Vibrator Unit/Jam 87,272.89 87,272.89 87,399.81 87,399.81
24 Crane 10-15 Ton Unit/Jam 312,978.64 312,978.64 313,433.81 313,433.81
25 Crane On Track 35 Ton Unit/Jam 259,812.39 493,139.39 260,190.25 493,856.59
26 Crane On Track 75-100 Ton Unit/Jam 408,276.62 619,431.19 408,870.39 620,332.05
27 Dump Truck 10 Ton Unit/Jam 386,207.61 414,958.76 386,769.29 415,562.25
28 Dump Truck 3-4 M3 Unit/Jam 210,658.70 213,493.27 210,965.07 213,803.77
29 Excavator 80-140 HP Unit/Jam 304,953.54 484,118.55 305,397.05 484,822.62
30 Flat Bed Truck 3-4 M3 Unit/Jam 370,157.42 494,141.71 370,695.76 494,860.36
31 Fulvi Mixer Unit/Jam 926,898.27 1,447,344.07 928,246.29 1,449,449.00
32 Generator Set Unit/Jam 412,289.16 437,009.71 412,888.77 437,645.27
33 Hot Recycler Unit/Jam 3,028,469.56 8,880,518.34 3,032,873.98 8,893,433.63
34 Jack Hammer Unit/Jam 57,178.79 57,178.79 57,261.95 57,261.95
35 Launching Gantry Unit/Jam 72,766,529.66 72,766,529.66 72,872,356.92 72,872,356.92
36 Motor Grader > 100 HP Unit/Jam 285,893.95 480,109.29 286,309.73 480,807.53
37 Pedestrian Roller Unit/Jam 94,294.85 94,294.85 94,431.98 94,431.98
38 Pile Driver + Hammer Unit/Jam 107,335.62 313,724.86 107,491.72 314,181.12
39 Rock Drill Breaker Unit/Jam 104,326.21 338,782.75 104,477.94 339,275.46
40 Split Form Paver Unit/Jam 220,690.06 220,690.06 221,011.02 221,011.02
41 Stone Crusher Unit/Jam 590,847.49 736,702.14 591,706.78 737,773.56
42 Tamper Unit/Jam 88,276.03 88,276.03 88,404.41 88,404.41
43 Tandem Roller 6-8 T Unit/Jam 426,333.08 497,148.66 426,953.11 497,871.68
44 Three Wheel Roller 6-8 T Unit/Jam 141,442.27 178,412.22 141,647.97 178,671.69
45 Tire Roller 8-10 T Unit/Jam 252,790.44 456,053.71 253,158.08 456,716.96
46 Track Loader 75-100 HP Unit/Jam 236,740.25 311,720.23 237,084.55 312,173.57
47 Trailer 20 Ton Unit/Jam 382,195.06 528,220.45 382,750.91 528,988.66
48 Trailler 15 Ton Unit/Jam 331,035.10 503,162.55 331,516.53 503,894.32
49 Truck Mixer (agitator) Unit/Jam 416,301.71 611,412.66 416,907.16 612,301.86
50 Vibrating Rammer Unit/Jam 85,266.62 85,266.62 85,390.62 85,390.62
51 Vibratory Roller 5-8 T Unit/Jam 205,643.01 441,018.97 205,942.09 441,660.36
52 Water Pump 70-100 MM Unit/Jam 64,200.75 64,200.75 64,294.12 64,294.12
53 Water Tanker 3000-4500 L Unit/Jam 232,190 232,190 232,818.21 232,818.21 233,139.17 233,139.17 233,145.66
54 Welding Set Unit/Jam 130,106 130,106 130,458.48 130,458.48 130,638.33 130,638.33 130,641.97
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 226,185 360,000 226,797.05 360,974.04 227,109.71 361,471.67 227,116.04
53 Water Tanker 3000-4500 L Unit/Jam 233,145.66 232,837.74 232,837.74 232,505.15 232,505.15 232,454.82 232,454.82
54 Welding Set Unit/Jam 130,641.97 130,469.42 130,469.42 130,283.06 130,283.06 130,254.86 130,254.86
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 361,481.73 226,816.07 361,004.31 226,492.09 360,488.64 226,443.06 360,410.61
53 Water Tanker 3000-4500 L Unit/Jam 232,727.70 232,727.70 233,066.17 233,066.17
54 Welding Set Unit/Jam 130,407.76 130,407.76 130,597.42 130,597.42
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 226,708.88 360,833.70 227,038.60 361,358.48
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020

Oct-19 Nov-19 Dec-19


No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231
Min Max Min Max Min Max Min
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52
2 Agregat Pecah Mesin 20-30 mm M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 344,000 344,000 344,930.74 344,930.74 345,406.26 345,406.26 345,415.88
4 Bahan Agr. Base Kelas A M3 330,000 330,000 330,892.87 330,892.87 331,349.03 331,349.03 331,358.25
5 Bahan Agr. Base Kelas B M3 310,000 310,000 310,838.75 310,838.75 311,267.27 311,267.27 311,275.94
6 Bahan Agr. Base Kelas C M3 285,000 285,000 285,771.11 285,771.11 286,165.07 286,165.07 286,173.04
7 Bahan Agr. Base Kelas C2 M3 260,000 260,000 260,703.47 260,703.47 261,062.87 261,062.87 261,070.14
8 Bahan Agr. Base Kelas S M3 211,000 211,000 211,570.89 211,570.89 211,862.56 211,862.56 211,868.46
9 Bahan Pilihan M3 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34
10 Bahan Tanah Timbunan M3 120,000 120,000 120,324.68 120,324.68 120,490.56 120,490.56 120,493.91
11 Batu Belah/Kerakal M3 339,000 339,000 339,917.22 339,917.22 340,385.82 340,385.82 340,395.30
12 Batu Kali M3 374,000 374,000 375,011.91 375,011.91 375,528.90 375,528.90 375,539.36
13 Chipping M3 223,000 223,000 223,603.36 223,603.36 223,911.62 223,911.62 223,917.85
14 Chipping (kg) Kg 318 288 318.86 288.78 319.30 289.18 319.31
15 Filler Cement Kg 2,000 2,000 2,005.41 2,005.41 2,008.18 2,008.18 2,008.23
16 Gebalan Rumput M' 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 400,000 400,000 401,082.26 401,082.26 401,635.19 401,635.19 401,646.37
18 Kapur M3 100,000 100,000 100,270.57 100,270.57 100,408.80 100,408.80 100,411.59
19 Pasir Beton (Kasar) M3 475,000 475,000 476,285.19 476,285.19 476,941.79 476,941.79 476,955.06
20 Pasir Halus (untuk HRS) M3 300,000 300,000 300,811.70 300,811.70 301,226.39 301,226.39 301,234.78
21 Pasir Pasang (Sedang) M3 266,000 266,000 266,719.70 266,719.70 267,087.40 267,087.40 267,094.84
22 Pasir Urug M3 204,000 204,000 204,551.95 204,551.95 204,833.95 204,833.95 204,839.65
23 Pasir Urug (ada unsur lempung) M3 160,000 160,000 160,432.90 160,432.90 160,654.08 160,654.08 160,658.55
24 Sirtu M3 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11
26 Anti Pengelupas Liter 101,000 101,000 101,273.27 101,273.27 101,412.89 101,412.89 101,415.71
27 Arbocell Kg 142,000 142,000 142,384.20 142,384.20 142,580.49 142,580.49 142,584.46
28 Asbuton Curah Kg 15,000 15,000 15,040.58 15,040.58 15,061.32 15,061.32 15,061.74
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28
30 Aspal Emulsi (CSS-1) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Dec-19 Jan-20 Feb-20 Mar-20
No Jenis Bahan Satuan
1.0041159231 1.0027897387 1.0013573407 1.0011405724
Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28
2 Agregat Pecah Mesin 20-30 mm M3 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 345,415.88 344,959.67 344,959.67 344,466.93 344,466.93 344,392.36 344,392.36
4 Bahan Agr. Base Kelas A M3 331,358.25 330,920.61 330,920.61 330,447.92 330,447.92 330,376.39 330,376.39
5 Bahan Agr. Base Kelas B M3 311,275.94 310,864.82 310,864.82 310,420.78 310,420.78 310,353.58 310,353.58
6 Bahan Agr. Base Kelas C M3 286,173.04 285,795.08 285,795.08 285,386.84 285,386.84 285,325.06 285,325.06
7 Bahan Agr. Base Kelas C2 M3 261,070.14 260,725.33 260,725.33 260,352.91 260,352.91 260,296.55 260,296.55
8 Bahan Agr. Base Kelas S M3 211,868.46 211,588.63 211,588.63 211,286.40 211,286.40 211,240.66 211,240.66
9 Bahan Pilihan M3 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52
10 Bahan Tanah Timbunan M3 120,493.91 120,334.77 120,334.77 120,162.88 120,162.88 120,136.87 120,136.87
11 Batu Belah/Kerakal M3 340,395.30 339,945.72 339,945.72 339,460.14 339,460.14 339,386.65 339,386.65
12 Batu Kali M3 375,539.36 375,043.36 375,043.36 374,507.65 374,507.65 374,426.57 374,426.57
13 Chipping M3 223,917.85 223,622.11 223,622.11 223,302.69 223,302.69 223,254.35 223,254.35
14 Chipping (kg) Kg 289.19 318.89 288.80 318.43 288.39 318.36 288.33
15 Filler Cement Kg 2,008.23 2,005.58 2,005.58 2,002.71 2,002.71 2,002.28 2,002.28
16 Gebalan Rumput M' 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 401,646.37 401,115.90 401,115.90 400,542.94 400,542.94 400,456.23 400,456.23
18 Kapur M3 100,411.59 100,278.97 100,278.97 100,135.73 100,135.73 100,114.06 100,114.06
19 Pasir Beton (Kasar) M3 476,955.06 476,325.13 476,325.13 475,644.74 475,644.74 475,541.77 475,541.77
20 Pasir Halus (untuk HRS) M3 301,234.78 300,836.92 300,836.92 300,407.20 300,407.20 300,342.17 300,342.17
21 Pasir Pasang (Sedang) M3 267,094.84 266,742.07 266,742.07 266,361.05 266,361.05 266,303.39 266,303.39
22 Pasir Urug M3 204,839.65 204,569.11 204,569.11 204,276.90 204,276.90 204,232.68 204,232.68
23 Pasir Urug (ada unsur lempung) M3 160,658.55 160,446.36 160,446.36 160,217.17 160,217.17 160,182.49 160,182.49
24 Sirtu M3 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84
26 Anti Pengelupas Liter 101,415.71 101,281.76 101,281.76 101,137.09 101,137.09 101,115.20 101,115.20
27 Arbocell Kg 142,584.46 142,396.14 142,396.14 142,192.74 142,192.74 142,161.96 142,161.96
28 Asbuton Curah Kg 15,061.74 15,041.85 15,041.85 15,020.36 15,020.36 15,017.11 15,017.11
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55
30 Aspal Emulsi (CSS-1) Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Apr-20 May-20
No Jenis Bahan Satuan
1.0023158394 1.0037735472
Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,729.49 315,729.49 316,188.67 316,188.67
2 Agregat Pecah Mesin 20-30 mm M3 300,694.75 300,694.75 301,132.06 301,132.06
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 344,796.65 344,796.65 345,298.10 345,298.10
4 Bahan Agr. Base Kelas A M3 330,764.23 330,764.23 331,245.27 331,245.27
5 Bahan Agr. Base Kelas B M3 310,717.91 310,717.91 311,169.80 311,169.80
6 Bahan Agr. Base Kelas C M3 285,660.01 285,660.01 286,075.46 286,075.46
7 Bahan Agr. Base Kelas C2 M3 260,602.12 260,602.12 260,981.12 260,981.12
8 Bahan Agr. Base Kelas S M3 211,488.64 211,488.64 211,796.22 211,796.22
9 Bahan Pilihan M3 210,486.33 210,486.33 210,792.44 210,792.44
10 Bahan Tanah Timbunan M3 120,277.90 120,277.90 120,452.83 120,452.83
11 Batu Belah/Kerakal M3 339,785.07 339,785.07 340,279.23 340,279.23
12 Batu Kali M3 374,866.12 374,866.12 375,411.31 375,411.31
13 Chipping M3 223,516.43 223,516.43 223,841.50 223,841.50
14 Chipping (kg) Kg 318.74 288.67 319.20 289.09
15 Filler Cement Kg 2,004.63 2,004.63 2,007.55 2,007.55
16 Gebalan Rumput M' 7,016.21 7,016.21 7,026.41 7,026.41
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 400,926.34 400,926.34 401,509.42 401,509.42
18 Kapur M3 100,231.58 100,231.58 100,377.35 100,377.35
19 Pasir Beton (Kasar) M3 476,100.02 476,100.02 476,792.43 476,792.43
20 Pasir Halus (untuk HRS) M3 300,694.75 300,694.75 301,132.06 301,132.06
21 Pasir Pasang (Sedang) M3 266,616.01 266,616.01 267,003.76 267,003.76
22 Pasir Urug M3 204,472.43 204,472.43 204,769.80 204,769.80
23 Pasir Urug (ada unsur lempung) M3 160,370.53 160,370.53 160,603.77 160,603.77
24 Sirtu M3 205,474.75 205,474.75 205,773.58 205,773.58
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,162.11 70,162.11 70,264.15 70,264.15
26 Anti Pengelupas Liter 101,233.90 101,233.90 101,381.13 101,381.13
27 Arbocell Kg 142,328.85 142,328.85 142,535.84 142,535.84
28 Asbuton Curah Kg 15,034.74 15,034.74 15,056.60 15,056.60
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,025.47 11,025.47 11,041.51 11,041.51
30 Aspal Emulsi (CSS-1) Kg 10,023.16 10,023.16 10,037.74 10,037.74
31 Aspal Minyak (Drum) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
32 Aspal Modifikasi (BNA) Kg 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51
33 Aspal Modifikasi (JAP-57) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85
34 Aspal Modifikasi (Retona) Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39
35 Aspal Modifikasi (Starbit) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85
36 Aspal Minyak (Curah) Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
37 Assetilline Botol 156,000 156,000 156,422.08 156,422.08 156,637.72 156,637.72 156,642.08
38 Bahan Pengawet: Kreosot Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28
39 Bensin Liter 11,000 11,000 11,029.76 11,029.76 11,044.97 11,044.97 11,045.28
40 Beton B-0 M3 590,483 590,483 592,080.80 592,080.80 592,897.04 592,897.04 592,913.54
41 Beton K-125 (fc' 10 MPa) M3 610,500 610,500 612,151.34 612,151.34 612,995.24 612,995.24 613,012.31
42 Beton K-175 (fc' 15 MPa) M3 660,540 660,540 662,327.68 662,327.68 663,240.76 663,240.76 663,259.22
43 Beton K-250 (fc' 20 MPa) M3 735,602 735,602 737,592.19 737,592.19 738,609.02 738,609.02 738,629.58
44 Beton K-300 (fc' 25 MPa) M3 765,626 765,626 767,697.99 767,697.99 768,756.33 768,756.33 768,777.73
45 Beton K-350 (fc' 30 MPa) M3 795,651 795,651 797,803.79 797,803.79 798,903.64 798,903.64 798,925.88
46 Beton K-400 (fc' 35 MPa) M3 825,676 825,676 827,909.60 827,909.60 829,050.95 829,050.95 829,074.02
47 Beton K-450 (fc' 40 MPa) M3 865,708 865,708 868,050.67 868,050.67 869,247.35 869,247.35 869,271.55
48 Beton K-500 (fc' 45 MPa) M3 900,737 900,737 903,174.11 903,174.11 904,419.21 904,419.21 904,444.39
49 Bunker Oil Liter 4,000 4,000 4,010.82 4,010.82 4,016.35 4,016.35 4,016.46
50 Cat Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53
51 Cat Anti Karat Kg 73,000 73,000 73,197.51 73,197.51 73,298.42 73,298.42 73,300.46
52 Cat Marka (Non Thermoplas) Kg 65,000 65,000 65,175.87 65,175.87 65,265.72 65,265.72 65,267.53
53 Cat Marka (Thermoplastic) Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22
54 Cerucuk Diameter 10-15 cm M' 25,000 25,000 25,067.64 25,067.64 25,102.20 25,102.20 25,102.90
55 Cold Mix (Aspal Dingin) Kg 8,000 8,000 8,021.65 8,021.65 8,032.70 8,032.70 8,032.93
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,306,000 1,306,000 1,309,533.58 1,309,533.58 1,311,338.89 1,311,338.89 1,311,375.40
57 Curing Compound Liter 50,000 50,000 50,135.28 50,135.28 50,204.40 50,204.40 50,205.80
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 610,000 610,000 611,650.45 611,650.45 612,493.66 612,493.66 612,510.71
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 711,000 711,000 712,923.72 712,923.72 713,906.55 713,906.55 713,926.42
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 901,000 901,000 903,437.79 903,437.79 904,683.26 904,683.26 904,708.45
61 Kerosen/Minyak Tanah Liter 14,000 14,000 14,037.88 14,037.88 14,057.23 14,057.23 14,057.62
62 Minyak Fluks Liter 7,000 7,000 7,018.94 7,018.94 7,028.62 7,028.62 7,028.81
63 Minyak Pelumas/Olie Liter 48,000 48,000 48,129.87 48,129.87 48,196.22 48,196.22 48,197.56
64 Oxygen (Isi 6 M3) Botol 172,000 172,000 172,465.37 172,465.37 172,703.13 172,703.13 172,707.94
65 Polytene 125 Mikron Kg 27,000 27,000 27,073.05 27,073.05 27,110.38 27,110.38 27,111.13
66 Sand Sheet Ton 1,381,000 1,381,000 1,384,736.51 1,384,736.51 1,386,645.49 1,386,645.49 1,386,684.09
67 Seal Coat M2 110,000 110,000 110,297.62 110,297.62 110,449.68 110,449.68 110,452.75
31 Aspal Minyak (Drum) Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
32 Aspal Modifikasi (BNA) Kg 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83
33 Aspal Modifikasi (JAP-57) Kg 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25
34 Aspal Modifikasi (Retona) Kg 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69
35 Aspal Modifikasi (Starbit) Kg 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25
36 Aspal Minyak (Curah) Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
37 Assetilline Botol 156,642.08 156,435.20 156,435.20 156,211.75 156,211.75 156,177.93 156,177.93
38 Bahan Pengawet: Kreosot Liter 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55
39 Bensin Liter 11,045.28 11,030.69 11,030.69 11,014.93 11,014.93 11,012.55 11,012.55
40 Beton B-0 M3 592,913.54 592,130.45 592,130.45 591,284.65 591,284.65 591,156.65 591,156.65
41 Beton K-125 (fc' 10 MPa) M3 613,012.31 612,202.67 612,202.67 611,328.20 611,328.20 611,195.86 611,195.86
42 Beton K-175 (fc' 15 MPa) M3 663,259.22 662,383.22 662,383.22 661,437.06 661,437.06 661,293.88 661,293.88
43 Beton K-250 (fc' 20 MPa) M3 738,629.58 737,654.04 737,654.04 736,600.37 736,600.37 736,440.91 736,440.91
44 Beton K-300 (fc' 25 MPa) M3 768,777.73 767,762.37 767,762.37 766,665.69 766,665.69 766,499.72 766,499.72
45 Beton K-350 (fc' 30 MPa) M3 798,925.88 797,870.70 797,870.70 796,731.01 796,731.01 796,558.54 796,558.54
46 Beton K-400 (fc' 35 MPa) M3 829,074.02 827,979.03 827,979.03 826,796.33 826,796.33 826,617.35 826,617.35
47 Beton K-450 (fc' 40 MPa) M3 869,271.55 868,123.46 868,123.46 866,883.42 866,883.42 866,695.77 866,695.77
48 Beton K-500 (fc' 45 MPa) M3 904,444.39 903,249.85 903,249.85 901,959.63 901,959.63 901,764.38 901,764.38
49 Bunker Oil Liter 4,016.46 4,011.16 4,011.16 4,005.43 4,005.43 4,004.56 4,004.56
50 Cat Kg 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14
51 Cat Anti Karat Kg 73,300.46 73,203.65 73,203.65 73,099.09 73,099.09 73,083.26 73,083.26
52 Cat Marka (Non Thermoplas) Kg 65,267.53 65,181.33 65,181.33 65,088.23 65,088.23 65,074.14 65,074.14
53 Cat Marka (Thermoplastic) Kg 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33
54 Cerucuk Diameter 10-15 cm M' 25,102.90 25,069.74 25,069.74 25,033.93 25,033.93 25,028.51 25,028.51
55 Cold Mix (Aspal Dingin) Kg 8,032.93 8,022.32 8,022.32 8,010.86 8,010.86 8,009.12 8,009.12
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,311,375.40 1,309,643.40 1,309,643.40 1,307,772.69 1,307,772.69 1,307,489.59 1,307,489.59
57 Curing Compound Liter 50,205.80 50,139.49 50,139.49 50,067.87 50,067.87 50,057.03 50,057.03
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 612,510.71 611,701.74 611,701.74 610,827.98 610,827.98 610,695.75 610,695.75
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 713,926.42 712,983.50 712,983.50 711,965.07 711,965.07 711,810.95 711,810.95
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 904,708.45 903,513.55 903,513.55 902,222.96 902,222.96 902,027.66 902,027.66
61 Kerosen/Minyak Tanah Liter 14,057.62 14,039.06 14,039.06 14,019.00 14,019.00 14,015.97 14,015.97
62 Minyak Fluks Liter 7,028.81 7,019.53 7,019.53 7,009.50 7,009.50 7,007.98 7,007.98
63 Minyak Pelumas/Olie Liter 48,197.56 48,133.91 48,133.91 48,065.15 48,065.15 48,054.75 48,054.75
64 Oxygen (Isi 6 M3) Botol 172,707.94 172,479.84 172,479.84 172,233.46 172,233.46 172,196.18 172,196.18
65 Polytene 125 Mikron Kg 27,111.13 27,075.32 27,075.32 27,036.65 27,036.65 27,030.80 27,030.80
66 Sand Sheet Ton 1,386,684.09 1,384,852.63 1,384,852.63 1,382,874.49 1,382,874.49 1,382,575.13 1,382,575.13
67 Seal Coat M2 110,452.75 110,306.87 110,306.87 110,149.31 110,149.31 110,125.46 110,125.46
31 Aspal Minyak (Drum) Kg 10,023.16 10,023.16 10,037.74 10,037.74
32 Aspal Modifikasi (BNA) Kg 13,030.11 13,030.11 13,049.06 13,049.06
33 Aspal Modifikasi (JAP-57) Kg 16,037.05 16,037.05 16,060.38 16,060.38
34 Aspal Modifikasi (Retona) Kg 12,027.79 12,027.79 12,045.28 12,045.28
35 Aspal Modifikasi (Starbit) Kg 16,037.05 16,037.05 16,060.38 16,060.38
36 Aspal Minyak (Curah) Kg 10,023.16 10,023.16 10,037.74 10,037.74
37 Assetilline Botol 156,361.27 156,361.27 156,588.67 156,588.67
38 Bahan Pengawet: Kreosot Liter 11,025.47 11,025.47 11,041.51 11,041.51
39 Bensin Liter 11,025.47 11,025.47 11,041.51 11,041.51
40 Beton B-0 M3 591,850.63 591,850.63 592,711.38 592,711.38
41 Beton K-125 (fc' 10 MPa) M3 611,913.36 611,913.36 612,803.29 612,803.29
42 Beton K-175 (fc' 15 MPa) M3 662,070.19 662,070.19 663,033.07 663,033.07
43 Beton K-250 (fc' 20 MPa) M3 737,305.44 737,305.44 738,377.73 738,377.73
44 Beton K-300 (fc' 25 MPa) M3 767,399.54 767,399.54 768,515.60 768,515.60
45 Beton K-350 (fc' 30 MPa) M3 797,493.64 797,493.64 798,653.47 798,653.47
46 Beton K-400 (fc' 35 MPa) M3 827,587.74 827,587.74 828,791.33 828,791.33
47 Beton K-450 (fc' 40 MPa) M3 867,713.20 867,713.20 868,975.15 868,975.15
48 Beton K-500 (fc' 45 MPa) M3 902,822.99 902,822.99 904,136.00 904,136.00
49 Bunker Oil Liter 4,009.26 4,009.26 4,015.09 4,015.09
50 Cat Kg 65,150.53 65,150.53 65,245.28 65,245.28
51 Cat Anti Karat Kg 73,169.06 73,169.06 73,275.47 73,275.47
52 Cat Marka (Non Thermoplas) Kg 65,150.53 65,150.53 65,245.28 65,245.28
53 Cat Marka (Thermoplastic) Kg 45,104.21 45,104.21 45,169.81 45,169.81
54 Cerucuk Diameter 10-15 cm M' 25,057.90 25,057.90 25,094.34 25,094.34
55 Cold Mix (Aspal Dingin) Kg 8,018.53 8,018.53 8,030.19 8,030.19
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,309,024.49 1,309,024.49 1,310,928.25 1,310,928.25
57 Curing Compound Liter 50,115.79 50,115.79 50,188.68 50,188.68
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 611,412.66 611,412.66 612,301.86 612,301.86
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 712,646.56 712,646.56 713,682.99 713,682.99
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 903,086.57 903,086.57 904,399.97 904,399.97
61 Kerosen/Minyak Tanah Liter 14,032.42 14,032.42 14,052.83 14,052.83
62 Minyak Fluks Liter 7,016.21 7,016.21 7,026.41 7,026.41
63 Minyak Pelumas/Olie Liter 48,111.16 48,111.16 48,181.13 48,181.13
64 Oxygen (Isi 6 M3) Botol 172,398.32 172,398.32 172,649.05 172,649.05
65 Polytene 125 Mikron Kg 27,062.53 27,062.53 27,101.89 27,101.89
66 Sand Sheet Ton 1,384,198.17 1,384,198.17 1,386,211.27 1,386,211.27
67 Seal Coat M2 110,254.74 110,254.74 110,415.09 110,415.09
68 Seal Guard Kg 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17
69 Semen/PC (50 kg) Zak 69,000 69,000 69,186.69 69,186.69 69,282.07 69,282.07 69,284.00
70 Semen/PC (kg) Kg 1,000 1,000 1,002.71 1,002.71 1,004.09 1,004.09 1,004.12
71 Slurry Seal Ton 40,000 40,000 40,108.23 40,108.23 40,163.52 40,163.52 40,164.64
72 Solar Liter 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39
73 Thinner Liter 35,000 35,000 35,094.70 35,094.70 35,143.08 35,143.08 35,144.06
68 Seal Guard Kg 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06
69 Semen/PC (50 kg) Zak 69,284.00 69,192.49 69,192.49 69,093.66 69,093.66 69,078.70 69,078.70
70 Semen/PC (kg) Kg 1,004.12 1,002.79 1,002.79 1,001.36 1,001.36 1,001.14 1,001.14
71 Slurry Seal Ton 40,164.64 40,111.59 40,111.59 40,054.29 40,054.29 40,045.62 40,045.62
72 Solar Liter 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69
73 Thinner Liter 35,144.06 35,097.64 35,097.64 35,047.51 35,047.51 35,039.92 35,039.92
68 Seal Guard Kg 36,083.37 36,083.37 36,135.85 36,135.85
69 Semen/PC (50 kg) Zak 69,159.79 69,159.79 69,260.37 69,260.37
70 Semen/PC (kg) Kg 1,002.32 1,002.32 1,003.77 1,003.77
71 Slurry Seal Ton 40,092.63 40,092.63 40,150.94 40,150.94
72 Solar Liter 12,027.79 12,027.79 12,045.28 12,045.28
73 Thinner Liter 35,081.05 35,081.05 35,132.07 35,132.07
Oct-19 Nov-19 Dec-19
No Jenis Bahan Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231
Min Max Min Max Min Max Min
BAHAN JADI
74 Baja Bergelombang Kg 17,000 17,000 17,046.00 17,046.00 17,069.50 17,069.50 17,069.97
75 Baja Prategang Kg 20,000 20,000 20,054.11 20,054.11 20,081.76 20,081.76 20,082.32
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,000 16,000 16,043.29 16,043.29 16,065.41 16,065.41 16,065.85
77 Baja Tulangan (Polos) U25 Kg 12,000 10,000 12,032.47 10,027.06 12,049.06 10,040.88 12,049.39
78 Baja Tulangan (Polos) U32 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
79 Baja Tulangan (Polos) U36 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
80 Baja Tulangan (Ulir) D16 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
81 Baja Tulangan (Ulir) D19 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
82 Baja Tulangan (Ulir) D24 Kg 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
83 Baja Tulangan (Ulir) D32 Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39
84 Baja Tulangan (Ulir) D36 Kg 11,000 12,000 11,029.76 12,032.47 11,044.97 12,049.06 11,045.28
85 Besi Beton Kg 12,000 12,000 12,032.47 12,032.47 12,049.06 12,049.06 12,049.39
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,011,000 13,011,000 13,046,203.26 13,046,203.26 13,064,188.60 13,064,188.60 13,064,552.27
87 Box Culvert Type DUB 200×200 M' 13,811,000 13,811,000 13,848,367.78 13,848,367.78 13,867,458.98 13,867,458.98 13,867,845.01
88 Box Culvert Type uk 300×200 M' 14,912,000 14,912,000 14,952,346.70 14,952,346.70 14,972,959.83 14,972,959.83 14,973,376.64
89 Casing M2 13,000 13,000 13,035.17 13,035.17 13,053.14 13,053.14 13,053.51
90 Ducting (Kabel Prestress) M' 194,000 194,000 194,524.90 194,524.90 194,793.07 194,793.07 194,798.49
91 Ducting (Strand Prestress) M' 169,000 169,000 169,457.26 169,457.26 169,690.87 169,690.87 169,695.59
92 Expansion Cap M2 10,000 10,000 10,027.06 10,027.06 10,040.88 10,040.88 10,041.16
93 Expansion Join Baja Siku M' 2,178,000 2,178,000 2,183,892.91 2,183,892.91 2,186,903.60 2,186,903.60 2,186,964.48
94 Expansion Join Tipe Rubber M' 1,577,000 1,577,000 1,581,266.82 1,581,266.82 1,583,446.73 1,583,446.73 1,583,490.81
95 Expansion Join Tipe Torma M' 1,808,000 1,808,000 1,812,891.82 1,812,891.82 1,815,391.05 1,815,391.05 1,815,441.59
96 Expansion Tipe Joint Asphaltic Plug M' 2,145,000 2,145,000 2,150,803.63 2,150,803.63 2,153,768.70 2,153,768.70 2,153,828.65
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,000 42,000 42,113.64 42,113.64 42,171.69 42,171.69 42,172.87
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71
99 Glass Bead Kg 70,000 70,000 70,189.40 70,189.40 70,286.16 70,286.16 70,288.11
100 Joint Sealent Kg 45,000 45,000 45,121.75 45,121.75 45,183.96 45,183.96 45,185.22
101 Joint Socket Pile 16×16×16 Set 91,000 91,000 91,246.21 91,246.21 91,372.01 91,372.01 91,374.55
102 Joint Socket Pile 35×35 Set 783,000 783,000 785,118.53 785,118.53 786,200.88 786,200.88 786,222.77
103 Kawat Beton Kg 22,000 22,000 22,059.52 22,059.52 22,089.94 22,089.94 22,090.55
104 Kawat Bronjong Kg 34,000 34,000 34,091.99 34,091.99 34,138.99 34,138.99 34,139.94
105 Kawat Las Dos 138,000 138,000 138,373.38 138,373.38 138,564.14 138,564.14 138,568.00
Harga Satuan Dasar per Bulan
Dec-19 Jan-20 Feb-20 Mar-20
No Jenis Bahan Satuan
1.0041159231 1.0027897387 1.0013573407 1.0011405724
Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,069.97 17,047.43 17,047.43 17,023.07 17,023.07 17,019.39 17,019.39
75 Baja Prategang Kg 20,082.32 20,055.79 20,055.79 20,027.15 20,027.15 20,022.81 20,022.81
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,065.85 16,044.64 16,044.64 16,021.72 16,021.72 16,018.25 16,018.25
77 Baja Tulangan (Polos) U25 Kg 10,041.16 12,033.48 10,027.90 12,016.29 10,013.57 12,013.69 10,011.41
78 Baja Tulangan (Polos) U32 Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
79 Baja Tulangan (Polos) U36 Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
80 Baja Tulangan (Ulir) D16 Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
81 Baja Tulangan (Ulir) D19 Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
82 Baja Tulangan (Ulir) D24 Kg 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
83 Baja Tulangan (Ulir) D32 Kg 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69
84 Baja Tulangan (Ulir) D36 Kg 12,049.39 11,030.69 12,033.48 11,014.93 12,016.29 11,012.55 12,013.69
85 Besi Beton Kg 12,049.39 12,033.48 12,033.48 12,016.29 12,016.29 12,013.69 12,013.69
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,064,552.27 13,047,297.29 13,047,297.29 13,028,660.36 13,028,660.36 13,025,839.99 13,025,839.99
87 Box Culvert Type DUB 200×200 M' 13,867,845.01 13,849,529.08 13,849,529.08 13,829,746.23 13,829,746.23 13,826,752.45 13,826,752.45
88 Box Culvert Type uk 300×200 M' 14,973,376.64 14,953,600.58 14,953,600.58 14,932,240.66 14,932,240.66 14,929,008.22 14,929,008.22
89 Casing M2 13,053.51 13,036.27 13,036.27 13,017.65 13,017.65 13,014.83 13,014.83
90 Ducting (Kabel Prestress) M' 194,798.49 194,541.21 194,541.21 194,263.32 194,263.32 194,221.27 194,221.27
91 Ducting (Strand Prestress) M' 169,695.59 169,471.47 169,471.47 169,229.39 169,229.39 169,192.76 169,192.76
92 Expansion Cap M2 10,041.16 10,027.90 10,027.90 10,013.57 10,013.57 10,011.41 10,011.41
93 Expansion Join Baja Siku M' 2,186,964.48 2,184,076.05 2,184,076.05 2,180,956.29 2,180,956.29 2,180,484.17 2,180,484.17
94 Expansion Join Tipe Rubber M' 1,583,490.81 1,581,399.42 1,581,399.42 1,579,140.53 1,579,140.53 1,578,798.68 1,578,798.68
95 Expansion Join Tipe Torma M' 1,815,441.59 1,813,043.85 1,813,043.85 1,810,454.07 1,810,454.07 1,810,062.15 1,810,062.15
96 Expansion Tipe Joint Asphaltic Plug M' 2,153,828.65 2,150,983.99 2,150,983.99 2,147,911.50 2,147,911.50 2,147,446.53 2,147,446.53
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,172.87 42,117.17 42,117.17 42,057.01 42,057.01 42,047.90 42,047.90
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50
99 Glass Bead Kg 70,288.11 70,195.28 70,195.28 70,095.01 70,095.01 70,079.84 70,079.84
100 Joint Sealent Kg 45,185.22 45,125.54 45,125.54 45,061.08 45,061.08 45,051.33 45,051.33
101 Joint Socket Pile 16×16×16 Set 91,374.55 91,253.87 91,253.87 91,123.52 91,123.52 91,103.79 91,103.79
102 Joint Socket Pile 35×35 Set 786,222.77 785,184.37 785,184.37 784,062.80 784,062.80 783,893.07 783,893.07
103 Kawat Beton Kg 22,090.55 22,061.37 22,061.37 22,029.86 22,029.86 22,025.09 22,025.09
104 Kawat Bronjong Kg 34,139.94 34,094.85 34,094.85 34,046.15 34,046.15 34,038.78 34,038.78
105 Kawat Las Dos 138,568.00 138,384.98 138,384.98 138,187.31 138,187.31 138,157.40 138,157.40
Harga Satuan Dasar per Bulan
Apr-20 May-20
No Jenis Bahan Satuan
1.0023158394 1.0037735472
Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,039.37 17,039.37 17,064.15 17,064.15
75 Baja Prategang Kg 20,046.32 20,046.32 20,075.47 20,075.47
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,037.05 16,037.05 16,060.38 16,060.38
77 Baja Tulangan (Polos) U25 Kg 12,027.79 10,023.16 12,045.28 10,037.74
78 Baja Tulangan (Polos) U32 Kg 10,023.16 10,023.16 10,037.74 10,037.74
79 Baja Tulangan (Polos) U36 Kg 10,023.16 10,023.16 10,037.74 10,037.74
80 Baja Tulangan (Ulir) D16 Kg 10,023.16 10,023.16 10,037.74 10,037.74
81 Baja Tulangan (Ulir) D19 Kg 10,023.16 10,023.16 10,037.74 10,037.74
82 Baja Tulangan (Ulir) D24 Kg 10,023.16 10,023.16 10,037.74 10,037.74
83 Baja Tulangan (Ulir) D32 Kg 12,027.79 12,027.79 12,045.28 12,045.28
84 Baja Tulangan (Ulir) D36 Kg 11,025.47 12,027.79 11,041.51 12,045.28
85 Besi Beton Kg 12,027.79 12,027.79 12,045.28 12,045.28
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,041,131.39 13,041,131.39 13,060,097.62 13,060,097.62
87 Box Culvert Type DUB 200×200 M' 13,842,984.06 13,842,984.06 13,863,116.46 13,863,116.46
88 Box Culvert Type uk 300×200 M' 14,946,533.80 14,946,533.80 14,968,271.14 14,968,271.14
89 Casing M2 13,030.11 13,030.11 13,049.06 13,049.06
90 Ducting (Kabel Prestress) M' 194,449.27 194,449.27 194,732.07 194,732.07
91 Ducting (Strand Prestress) M' 169,391.38 169,391.38 169,637.73 169,637.73
92 Expansion Cap M2 10,023.16 10,023.16 10,037.74 10,037.74
93 Expansion Join Baja Siku M' 2,183,043.90 2,183,043.90 2,186,218.79 2,186,218.79
94 Expansion Join Tipe Rubber M' 1,580,652.08 1,580,652.08 1,582,950.88 1,582,950.88
95 Expansion Join Tipe Torma M' 1,812,187.04 1,812,187.04 1,814,822.57 1,814,822.57
96 Expansion Tipe Joint Asphaltic Plug M' 2,149,967.48 2,149,967.48 2,153,094.26 2,153,094.26
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,097.27 42,097.27 42,158.49 42,158.49
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,074.11 32,074.11 32,120.75 32,120.75
99 Glass Bead Kg 70,162.11 70,162.11 70,264.15 70,264.15
100 Joint Sealent Kg 45,104.21 45,104.21 45,169.81 45,169.81
101 Joint Socket Pile 16×16×16 Set 91,210.74 91,210.74 91,343.39 91,343.39
102 Joint Socket Pile 35×35 Set 784,813.30 784,813.30 785,954.69 785,954.69
103 Kawat Beton Kg 22,050.95 22,050.95 22,083.02 22,083.02
104 Kawat Bronjong Kg 34,078.74 34,078.74 34,128.30 34,128.30
105 Kawat Las Dos 138,319.59 138,319.59 138,520.75 138,520.75
106 Kayu Acuan (Kelas III/Meranti) M3 4,304,000 4,304,000 4,315,645.13 4,315,645.13 4,321,594.63 4,321,594.63 4,321,714.93
107 Kayu Perancah (Gelam) M3 2,772,000 2,772,000 2,779,500.07 2,779,500.07 2,783,331.86 2,783,331.86 2,783,409.34
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,000 55,000 55,148.81 55,148.81 55,224.84 55,224.84 55,226.38
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01
110 Marmer Nama Jembatan Buah 600,000 600,000 601,623.39 601,623.39 602,452.78 602,452.78 602,469.55
111 Mata Kucing Buah 158,000 158,000 158,427.49 158,427.49 158,645.90 158,645.90 158,650.32
112 Matras Concrete (Tebal=10 cm) M2 147,000 147,000 147,397.73 147,397.73 147,600.93 147,600.93 147,605.04
113 Mini Pile 16×16×16 M' 136,000 136,000 136,367.97 136,367.97 136,555.96 136,555.96 136,559.77
114 Mini Timber Pile Buah 32,000 32,000 32,086.58 32,086.58 32,130.82 32,130.82 32,131.71
115 Multipleks 12 mm Lbr 285,000 285,000 285,771.11 285,771.11 286,165.07 286,165.07 286,173.04
116 Paku Kg 18,000 18,000 18,048.70 18,048.70 18,073.58 18,073.58 18,074.09
117 Paving Block (Model Bata 8 cm) M2 95,000 95,000 95,257.04 95,257.04 95,388.36 95,388.36 95,391.01
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,533,000 66,533,000 66,713,015.23 66,713,015.23 66,804,985.02 66,804,985.02 66,806,844.71
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,255,000 94,255,000 94,510,021.35 94,510,021.35 94,640,311.78 94,640,311.78 94,642,946.33
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,147,000 180,147,000 180,634,415.32 180,634,415.32 180,883,435.85 180,883,435.85 180,888,471.19
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,235,000 236,235,000 236,874,170.01 236,874,170.01 237,200,722.01 237,200,722.01 237,207,325.08
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 301,137,000 301,137,000 301,951,772.32 301,951,772.32 302,368,039.55 302,368,039.55 302,376,456.72
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 363,321,000 363,321,000 364,304,020.66 364,304,020.66 364,806,245.98 364,806,245.98 364,816,401.28
124 Pelat Rambu (Eng. Grade) Buah 210,000 210,000 210,568.19 210,568.19 210,858.47 210,858.47 210,864.34
125 Pelat Rambu (High L Grade) Buah 245,000 245,000 245,662.89 245,662.89 246,001.55 246,001.55 246,008.40
126 Pemantul Cahaya (Reflector) Buah 15,012 15,012 15,052.62 15,052.62 15,073.37 15,073.37 15,073.79
127 Pipa Baja D10" Kg 23,000 23,000 23,062.23 23,062.23 23,094.02 23,094.02 23,094.67
128 Pipa Drainase Baja Dia 3" M' 275,000 275,000 275,744.05 275,744.05 276,124.19 276,124.19 276,131.88
129 Pipa Galvanis Dia 1,5" M' 180,000 180,000 180,487.02 180,487.02 180,735.83 180,735.83 180,740.87
130 Pipa Galvanis Dia 2" M' 205,000 205,000 205,554.66 205,554.66 205,838.03 205,838.03 205,843.76
131 Pipa Galvanis Dia 3" M' 241,197 241,197 241,849.60 241,849.60 242,183.01 242,183.01 242,189.75
132 Pipa Porus M' 45,037 45,037 45,158.85 45,158.85 45,221.11 45,221.11 45,222.37
133 Pipa PVC Dia 4" M' 209,000 209,000 209,565.48 209,565.48 209,854.39 209,854.39 209,860.23
134 Plastik Filter M2 36,000 36,000 36,097.40 36,097.40 36,147.17 36,147.17 36,148.17
135 Rel Pengaman M' 170,000 170,000 170,459.96 170,459.96 170,694.96 170,694.96 170,699.71
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,056,000 2,056,000 2,061,562.82 2,061,562.82 2,064,404.87 2,064,404.87 2,064,462.34
137 Strip Bearing Buah 315,000 315,000 315,852.28 315,852.28 316,287.71 316,287.71 316,296.52
138 Tiang Pancang Baja Diameter 400 M' 728,000 728,000 729,969.72 729,969.72 730,976.04 730,976.04 730,996.39
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 890,000 890,000 892,408.03 892,408.03 893,638.29 893,638.29 893,663.17
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,862,000 1,862,000 1,867,037.93 1,867,037.93 1,869,611.80 1,869,611.80 1,869,663.85
106 Kayu Acuan (Kelas III/Meranti) M3 4,321,714.93 4,316,007.04 4,316,007.04 4,309,841.99 4,309,841.99 4,308,909.02 4,308,909.02
107 Kayu Perancah (Gelam) M3 2,783,409.34 2,779,733.16 2,779,733.16 2,775,762.55 2,775,762.55 2,775,161.67 2,775,161.67
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,226.38 55,153.44 55,153.44 55,074.65 55,074.65 55,062.73 55,062.73
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35
110 Marmer Nama Jembatan Buah 602,469.55 601,673.84 601,673.84 600,814.40 600,814.40 600,684.34 600,684.34
111 Mata Kucing Buah 158,650.32 158,440.78 158,440.78 158,214.46 158,214.46 158,180.21 158,180.21
112 Matras Concrete (Tebal=10 cm) M2 147,605.04 147,410.09 147,410.09 147,199.53 147,199.53 147,167.66 147,167.66
113 Mini Pile 16×16×16 M' 136,559.77 136,379.40 136,379.40 136,184.60 136,184.60 136,155.12 136,155.12
114 Mini Timber Pile Buah 32,131.71 32,089.27 32,089.27 32,043.43 32,043.43 32,036.50 32,036.50
115 Multipleks 12 mm Lbr 286,173.04 285,795.08 285,795.08 285,386.84 285,386.84 285,325.06 285,325.06
116 Paku Kg 18,074.09 18,050.22 18,050.22 18,024.43 18,024.43 18,020.53 18,020.53
117 Paving Block (Model Bata 8 cm) M2 95,391.01 95,265.03 95,265.03 95,128.95 95,128.95 95,108.35 95,108.35
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,806,844.71 66,718,609.69 66,718,609.69 66,623,307.95 66,623,307.95 66,608,885.71 66,608,885.71
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,642,946.33 94,517,946.82 94,517,946.82 94,382,936.15 94,382,936.15 94,362,504.65 94,362,504.65
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,888,471.19 180,649,563.06 180,649,563.06 180,391,520.86 180,391,520.86 180,352,470.70 180,352,470.70
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 237,207,325.08 236,894,033.93 236,894,033.93 236,555,651.38 236,555,651.38 236,504,443.13 236,504,443.13
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 302,376,456.72 301,977,093.55 301,977,093.55 301,545,745.51 301,545,745.51 301,480,468.56 301,480,468.56
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,816,401.28 364,334,570.66 364,334,570.66 363,814,150.39 363,814,150.39 363,735,393.92 363,735,393.92
124 Pelat Rambu (Eng. Grade) Buah 210,864.34 210,585.85 210,585.85 210,285.04 210,285.04 210,239.52 210,239.52
125 Pelat Rambu (High L Grade) Buah 246,008.40 245,683.49 245,683.49 245,332.55 245,332.55 245,279.44 245,279.44
126 Pemantul Cahaya (Reflector) Buah 15,073.79 15,053.88 15,053.88 15,032.38 15,032.38 15,029.12 15,029.12
127 Pipa Baja D10" Kg 23,094.67 23,064.16 23,064.16 23,031.22 23,031.22 23,026.23 23,026.23
128 Pipa Drainase Baja Dia 3" M' 276,131.88 275,767.18 275,767.18 275,373.27 275,373.27 275,313.66 275,313.66
129 Pipa Galvanis Dia 1,5" M' 180,740.87 180,502.15 180,502.15 180,244.32 180,244.32 180,205.30 180,205.30
130 Pipa Galvanis Dia 2" M' 205,843.76 205,571.90 205,571.90 205,278.25 205,278.25 205,233.82 205,233.82
131 Pipa Galvanis Dia 3" M' 242,189.75 241,869.88 241,869.88 241,524.39 241,524.39 241,472.10 241,472.10
132 Pipa Porus M' 45,222.37 45,162.64 45,162.64 45,098.13 45,098.13 45,088.37 45,088.37
133 Pipa PVC Dia 4" M' 209,860.23 209,583.06 209,583.06 209,283.68 209,283.68 209,238.38 209,238.38
134 Plastik Filter M2 36,148.17 36,100.43 36,100.43 36,048.86 36,048.86 36,041.06 36,041.06
135 Rel Pengaman M' 170,699.71 170,474.26 170,474.26 170,230.75 170,230.75 170,193.90 170,193.90
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,064,462.34 2,061,735.70 2,061,735.70 2,058,790.69 2,058,790.69 2,058,345.02 2,058,345.02
137 Strip Bearing Buah 316,296.52 315,878.77 315,878.77 315,427.56 315,427.56 315,359.28 315,359.28
138 Tiang Pancang Baja Diameter 400 M' 730,996.39 730,030.93 730,030.93 728,988.14 728,988.14 728,830.34 728,830.34
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 893,663.17 892,482.87 892,482.87 891,208.03 891,208.03 891,015.11 891,015.11
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,869,663.85 1,867,194.49 1,867,194.49 1,864,527.37 1,864,527.37 1,864,123.75 1,864,123.75
106 Kayu Acuan (Kelas III/Meranti) M3 4,313,967.37 4,313,967.37 4,320,241.35 4,320,241.35
107 Kayu Perancah (Gelam) M3 2,778,419.51 2,778,419.51 2,782,460.27 2,782,460.27
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,127.37 55,127.37 55,207.55 55,207.55
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,220.00 95,220.00 95,358.49 95,358.49
110 Marmer Nama Jembatan Buah 601,389.50 601,389.50 602,264.13 602,264.13
111 Mata Kucing Buah 158,365.90 158,365.90 158,596.22 158,596.22
112 Matras Concrete (Tebal=10 cm) M2 147,340.43 147,340.43 147,554.71 147,554.71
113 Mini Pile 16×16×16 M' 136,314.95 136,314.95 136,513.20 136,513.20
114 Mini Timber Pile Buah 32,074.11 32,074.11 32,120.75 32,120.75
115 Multipleks 12 mm Lbr 285,660.01 285,660.01 286,075.46 286,075.46
116 Paku Kg 18,041.69 18,041.69 18,067.92 18,067.92
117 Paving Block (Model Bata 8 cm) M2 95,220.00 95,220.00 95,358.49 95,358.49
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,687,079.75 66,687,079.75 66,784,065.42 66,784,065.42
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,473,279.45 94,473,279.45 94,610,675.69 94,610,675.69
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,564,191.53 180,564,191.53 180,826,793.21 180,826,793.21
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,782,082.33 236,782,082.33 237,126,443.92 237,126,443.92
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 301,834,384.94 301,834,384.94 302,273,354.68 302,273,354.68
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,162,393.10 364,162,393.10 364,692,008.94 364,692,008.94
124 Pelat Rambu (Eng. Grade) Buah 210,486.33 210,486.33 210,792.44 210,792.44
125 Pelat Rambu (High L Grade) Buah 245,567.38 245,567.38 245,924.52 245,924.52
126 Pemantul Cahaya (Reflector) Buah 15,046.77 15,046.77 15,068.65 15,068.65
127 Pipa Baja D10" Kg 23,053.26 23,053.26 23,086.79 23,086.79
128 Pipa Drainase Baja Dia 3" M' 275,636.86 275,636.86 276,037.73 276,037.73
129 Pipa Galvanis Dia 1,5" M' 180,416.85 180,416.85 180,679.24 180,679.24
130 Pipa Galvanis Dia 2" M' 205,474.75 205,474.75 205,773.58 205,773.58
131 Pipa Galvanis Dia 3" M' 241,755.57 241,755.57 242,107.17 242,107.17
132 Pipa Porus M' 45,141.30 45,141.30 45,206.95 45,206.95
133 Pipa PVC Dia 4" M' 209,484.01 209,484.01 209,788.67 209,788.67
134 Plastik Filter M2 36,083.37 36,083.37 36,135.85 36,135.85
135 Rel Pengaman M' 170,393.69 170,393.69 170,641.50 170,641.50
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,060,761.37 2,060,761.37 2,063,758.41 2,063,758.41
137 Strip Bearing Buah 315,729.49 315,729.49 316,188.67 316,188.67
138 Tiang Pancang Baja Diameter 400 M' 729,685.93 729,685.93 730,747.14 730,747.14
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 892,061.10 892,061.10 893,358.46 893,358.46
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,866,312.09 1,866,312.09 1,869,026.34 1,869,026.34
HARGA SATUAN DASAR UPAH KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar
Jun-20 Jul-20 Aug-20 Sep-20
No Jenis Upah Satuan
1.0041651508 1.0031502833 1.0016910247 1.001140456
Min Max Min Max Min Max Min
1 Pekerja OH 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85
2 Tukang OH 135,562.30 135,562.30 135,425.29 135,425.29 135,228.29 135,228.29 135,153.96
3 Mandor OH 155,645.60 155,645.60 155,488.29 155,488.29 155,262.11 155,262.11 155,176.77
4 Operator OH 321,332.85 321,332.85 321,008.09 321,008.09 320,541.13 320,541.13 320,364.95
5 Pembantu Operator OH 200,833.03 200,833.03 200,630.06 200,630.06 200,338.20 200,338.20 200,228.09
6 Sopir OH 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07
7 Pembantu Sopir OH 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26
8 Mekanik OH 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28
9 Pembantu Mekanik OH 130,541.47 130,541.47 130,409.54 130,409.54 130,219.83 130,219.83 130,148.26
10 Kepala Tukang OH 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07
11 Pemasak Aspal OH 150,624.77 150,624.77 150,472.54 150,472.54 150,253.65 150,253.65 150,171.07

HARGA SATUAN DASAR ALAT KABUPATEN SUMENEP TA. 2019 / 2020


Harga Satuan Dasar
Jun-20 Jul-20 Aug-20 Sep-20
No Jenis Alat Satuan
1.0041651508 1.0031502833 1.0016910247 1.001140456
Min Max Min Max Min Max Min
1 Aggregat (Chip) Spreader Unit/Jam 473,349.10 528,190.87 472,870.71 527,657.05 472,182.83 526,889.48 471,923.30
2 Asphalt Distribution Unit/Jam 291,446.37 374,553.60 291,151.82 374,175.06 290,728.28 373,630.75 290,568.49
3 Asphalt Finisher Unit/Jam 214,062.33 1,015,210.97 213,845.99 1,014,184.94 213,534.91 1,012,709.63 213,417.55
4 Asphalt Liquid Mixer Unit/Jam 76,379.05 139,578.96 76,301.86 139,437.89 76,190.86 139,235.05 76,148.98
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,508.72 102,508.72 102,405.12 102,405.12 102,256.16 102,256.16 102,199.95
6 Asphalt Mixing Plant Unit/Jam 1,145,685.73 6,005,886.40 1,144,527.83 5,999,816.50 1,142,862.91 5,991,088.71 1,142,234.75
7 Asphalt Sprayer Unit/Jam 94,468.82 94,468.82 94,373.35 94,373.35 94,236.06 94,236.06 94,184.27
8 Asphalt Tanker Unit/Jam 442,194.49 512,124.23 441,747.58 511,606.64 441,104.98 510,862.42 440,862.54
9 Blending Equipment Unit/Jam 143,713.21 226,941.32 143,567.96 226,711.96 143,359.12 226,382.17 143,280.32
10 Bore Pile Machine Unit/Jam 395,965.07 688,857.29 395,564.88 688,161.09 394,989.46 687,160.04 394,772.36
11 Bore Pile Machine Dia 60 Unit/Jam 259,286.77 784,252.98 259,024.72 783,460.37 258,647.92 782,320.69 258,505.76
12 Bore Pile Machine Dia 80 Unit/Jam 1,025,087.23 1,025,087.23 1,024,051.22 1,024,051.22 1,022,561.55 1,022,561.55 1,021,999.51
13 Bulldozer 100-150 HP Unit/Jam 401,994.99 582,415.79 401,588.71 581,827.16 401,004.53 580,980.79 400,784.12
14 Cement Tanker Unit/Jam 373,855.34 481,999.27 373,477.50 481,512.14 372,934.21 480,811.69 372,729.23
15 Cold Milling Unit/Jam 583,897.73 1,242,152.29 583,307.60 1,240,896.90 582,459.08 1,239,091.80 582,138.94
HARGA SATUAN DASAR UPAH KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Sep-20 Oct-20 Nov-20 Dec-20
No Jenis Upah Satuan
1.0011404562 1.0019884346 1.0034268027 1.0041189267
Max Min Max Min Max Min Max
1 Pekerja OH 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27
2 Tukang OH 135,153.96 135,268.44 135,268.44 135,462.62 135,462.62 135,556.06 135,556.06
3 Mandor OH 155,176.77 155,308.21 155,308.21 155,531.15 155,531.15 155,638.43 155,638.43
4 Operator OH 320,364.95 320,636.30 320,636.30 321,096.58 321,096.58 321,318.06 321,318.06
5 Pembantu Operator OH 200,228.09 200,397.69 200,397.69 200,685.36 200,685.36 200,823.79 200,823.79
6 Sopir OH 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84
7 Pembantu Sopir OH 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46
8 Mekanik OH 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41
9 Pembantu Mekanik OH 130,148.26 130,258.50 130,258.50 130,445.48 130,445.48 130,535.46 130,535.46
10 Kepala Tukang OH 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84
11 Pemasak Aspal OH 150,171.07 150,298.27 150,298.27 150,514.02 150,514.02 150,617.84 150,617.84

HARGA SATUAN DASAR ALAT KABUPATEN SUMENEP TA. 2019 / 2020


Harga Satuan Dasar per Bulan
Sep-20 Oct-20 Nov-20 Dec-20
No Jenis Alat Satuan
1.0011404562 1.0019884346 1.0034268027 1.0041189267
Max Min Max Min Max Min Max
1 Aggregat (Chip) Spreader Unit/Jam 526,599.88 472,323.03 527,045.92 473,001.06 527,802.50 473,327.31 528,166.56
2 Asphalt Distribution Unit/Jam 373,425.39 290,814.60 373,741.69 291,232.07 374,278.20 291,432.95 374,536.36
3 Asphalt Finisher Unit/Jam 1,012,153.00 213,598.31 1,013,010.31 213,904.94 1,014,464.50 214,052.48 1,015,164.23
4 Asphalt Liquid Mixer Unit/Jam 139,158.52 76,213.48 139,276.39 76,322.89 139,476.33 76,375.53 139,572.53
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,199.95 102,286.52 102,286.52 102,433.35 102,433.35 102,504.00 102,504.00
6 Asphalt Mixing Plant Unit/Jam 5,987,795.78 1,143,202.24 5,992,867.51 1,144,843.32 6,001,470.36 1,145,632.99 6,005,609.93
7 Asphalt Sprayer Unit/Jam 94,184.27 94,264.04 94,264.04 94,399.36 94,399.36 94,464.47 94,464.47
8 Asphalt Tanker Unit/Jam 510,581.63 441,235.95 511,014.10 441,869.35 511,747.67 442,174.14 512,100.65
9 Blending Equipment Unit/Jam 226,257.74 143,401.68 226,449.39 143,607.54 226,774.46 143,706.59 226,930.88
10 Bore Pile Machine Unit/Jam 686,782.35 395,106.74 687,364.07 395,673.92 688,350.79 395,946.84 688,825.58
11 Bore Pile Machine Dia 60 Unit/Jam 781,890.70 258,724.72 782,552.97 259,096.12 783,676.33 259,274.83 784,216.88
12 Bore Pile Machine Dia 80 Unit/Jam 1,021,999.51 1,022,865.16 1,022,865.16 1,024,333.50 1,024,333.50 1,025,040.04 1,025,040.04
13 Bulldozer 100-150 HP Unit/Jam 580,661.46 401,123.59 581,153.29 401,699.41 581,987.55 401,976.49 582,388.98
14 Cement Tanker Unit/Jam 480,547.42 373,044.94 480,954.45 373,580.45 481,644.87 373,838.13 481,977.08
15 Cold Milling Unit/Jam 1,238,410.74 582,632.02 1,239,459.69 583,468.39 1,241,238.95 583,870.85 1,242,095.11
HARGA SATUAN DASAR UPAH KABUPATEN SUMENEP TA. 2019 / 2020

Rata2 Harga Satuan Dasar 2020


No Jenis Upah Satuan

Min Max
1 Pekerja OH 120,310.58 120,310.58
2 Tukang OH 135,349.40 135,349.40
3 Mandor OH 155,401.17 155,401.17
4 Operator OH 320,828.22 320,828.22
5 Pembantu Operator OH 200,517.64 200,517.64
6 Sopir OH 150,388.23 150,388.23
7 Pembantu Sopir OH 130,336.46 130,336.46
8 Mekanik OH 180,465.87 180,465.87
9 Pembantu Mekanik OH 130,336.46 130,336.46
10 Kepala Tukang OH 150,388.23 150,388.23
11 Pemasak Aspal OH 150,388.23 150,388.23

HARGA SATUAN DASAR ALAT KABUPATEN SUMENEP TA. 2019 / 2020

Rata2 Harga Satuan Dasar 2020


No Jenis Alat Satuan

Min Max
1 Aggregat (Chip) Spreader Unit/Jam 472,605.74 960,575.39
2 Asphalt Distribution Unit/Jam 290,988.67 640,700.13
3 Asphalt Finisher Unit/Jam 213,726.16 1,209,528.71
4 Asphalt Liquid Mixer Unit/Jam 76,259.10 209,262.65
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,347.74 196,164.79
6 Asphalt Mixing Plant Unit/Jam 1,143,886.50 7,044,998.02
7 Asphalt Sprayer Unit/Jam 94,320.47 180,779.31
8 Asphalt Tanker Unit/Jam 441,500.05 916,020.96
9 Blending Equipment Unit/Jam 143,487.52 358,112.75
10 Bore Pile Machine Unit/Jam 395,343.23 1,050,166.83
11 Bore Pile Machine Dia 60 Unit/Jam 258,879.58 1,020,323.31
12 Bore Pile Machine Dia 80 Unit/Jam 1,023,477.40 1,961,647.86
13 Bulldozer 100-150 HP Unit/Jam 401,363.69 949,411.13
14 Cement Tanker Unit/Jam 373,268.23 823,398.61
15 Cold Milling Unit/Jam 582,980.75 1,774,590.83
16 Cold Recycler Unit/Jam 4,917,403.73 4,917,403.73 4,912,433.92 4,912,433.92 4,905,287.92 4,905,287.92 4,902,591.78
17 Compressor 4000-6500 L\M Unit/Jam 149,743.13 149,743.13 149,591.80 149,591.80 149,374.19 149,374.19 149,292.09
18 Concrete Breaker Unit/Jam 545,708.20 1,040,315.10 545,156.68 1,039,263.69 544,363.65 1,037,751.90 544,064.45
19 Concrete Mixer (350) Unit/Jam 101,503.74 101,503.74 101,401.15 101,401.15 101,253.64 101,253.64 101,197.99
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,573.56 115,573.56 115,456.75 115,456.75 115,288.80 115,288.80 115,225.44
21 Concrete Pan Mixer Unit/Jam 307,526.17 658,732.34 307,215.36 658,066.59 306,768.47 657,109.31 306,599.85
22 Concrete Pump Unit/Jam 234,162.08 251,041.29 233,925.42 250,787.57 233,585.14 250,422.76 233,456.75
23 Concrete Vibrator Unit/Jam 87,433.91 87,433.91 87,345.54 87,345.54 87,218.49 87,218.49 87,170.55
24 Crane 10-15 Ton Unit/Jam 313,556.09 313,556.09 313,239.20 313,239.20 312,783.53 312,783.53 312,611.62
25 Crane On Track 35 Ton Unit/Jam 260,291.76 494,049.25 260,028.69 493,549.94 259,650.43 492,831.98 259,507.72
26 Crane On Track 75-100 Ton Unit/Jam 409,029.90 620,574.06 408,616.51 619,946.88 408,022.11 619,045.05 407,797.85
27 Dump Truck 10 Ton Unit/Jam 386,920.18 415,724.37 386,529.14 415,304.22 385,966.86 414,700.08 385,754.72
28 Dump Truck 3-4 M3 Unit/Jam 211,047.37 213,887.18 210,834.07 213,671.01 210,527.38 213,360.19 210,411.66
29 Excavator 80-140 HP Unit/Jam 305,516.19 485,011.77 305,207.42 484,521.59 304,763.44 483,816.76 304,595.93
30 Flat Bed Truck 3-4 M3 Unit/Jam 370,840.38 495,053.42 370,465.59 494,553.09 369,926.68 493,833.68 369,723.35
31 Fulvi Mixer Unit/Jam 928,608.43 1,450,014.48 927,669.92 1,448,549.01 926,320.47 1,446,441.84 925,811.32
32 Generator Set Unit/Jam 413,049.85 437,816.01 412,632.40 437,373.52 412,032.16 436,737.29 411,805.69
33 Hot Recycler Unit/Jam 3,034,057.20 8,896,903.24 3,030,990.80 8,887,911.51 3,026,581.69 8,874,982.48 3,024,918.17
34 Jack Hammer Unit/Jam 57,284.29 57,284.29 57,226.39 57,226.39 57,143.15 57,143.15 57,111.74
35 Launching Gantry Unit/Jam 72,900,786.72 72,900,786.72 72,827,108.96 72,827,108.96 72,721,169.11 72,721,169.11 72,681,198.72
36 Motor Grader > 100 HP Unit/Jam 286,421.43 480,995.11 286,131.96 480,508.99 285,715.73 479,810.00 285,558.69
37 Pedestrian Roller Unit/Jam 94,468.82 94,468.82 94,373.35 94,373.35 94,236.06 94,236.06 94,184.27
38 Pile Driver + Hammer Unit/Jam 107,533.66 314,303.69 107,424.98 313,986.04 107,268.71 313,529.29 107,209.75
39 Rock Drill Breaker Unit/Jam 104,518.70 339,407.82 104,413.07 339,064.80 104,261.18 338,571.57 104,203.87
40 Split Form Paver Unit/Jam 221,097.25 221,097.25 220,873.79 220,873.79 220,552.49 220,552.49 220,431.27
41 Stone Crusher Unit/Jam 591,937.62 738,061.39 591,339.38 737,315.46 590,479.17 736,242.90 590,154.62
42 Tamper Unit/Jam 88,438.90 88,438.90 88,349.52 88,349.52 88,221.00 88,221.00 88,172.51
43 Tandem Roller 6-8 T Unit/Jam 427,119.68 498,065.91 426,688.01 497,562.54 426,067.31 496,838.75 425,833.13
44 Three Wheel Roller 6-8 T Unit/Jam 141,703.23 178,741.40 141,560.02 178,560.75 141,354.10 178,301.00 141,276.40
45 Tire Roller 8-10 T Unit/Jam 253,256.84 456,895.14 253,000.89 456,433.38 252,632.85 455,769.42 252,494.00
46 Track Loader 75-100 HP Unit/Jam 237,177.04 312,295.36 236,937.34 311,979.74 236,592.67 311,525.91 236,462.63
47 Trailer 20 Ton Unit/Jam 382,900.23 529,195.03 382,513.25 528,660.20 381,956.82 527,891.17 381,746.88
48 Trailler 15 Ton Unit/Jam 331,645.87 504,090.91 331,310.69 503,581.44 330,828.74 502,848.89 330,646.90
49 Truck Mixer (agitator) Unit/Jam 417,069.80 612,540.74 416,648.29 611,921.67 416,042.20 611,031.53 415,813.53
50 Vibrating Rammer Unit/Jam 85,423.94 85,423.94 85,337.60 85,337.60 85,213.46 85,213.46 85,166.63
51 Vibratory Roller 5-8 T Unit/Jam 206,022.43 441,832.67 205,814.21 441,386.12 205,514.82 440,744.05 205,401.86
52 Water Pump 70-100 MM Unit/Jam 64,319.20 64,319.20 64,254.19 64,254.19 64,160.72 64,160.72 64,125.46
16 Cold Recycler Unit/Jam 4,902,591.78 4,906,744.34 4,906,744.34 4,913,788.04 4,913,788.04 4,917,177.37 4,917,177.37
17 Compressor 4000-6500 L\M Unit/Jam 149,292.09 149,418.54 149,418.54 149,633.03 149,633.03 149,736.24 149,736.24
18 Concrete Breaker Unit/Jam 1,037,181.51 544,525.28 1,038,060.02 545,306.95 1,039,550.17 545,683.08 1,040,267.21
19 Concrete Mixer (350) Unit/Jam 101,197.99 101,283.71 101,283.71 101,429.10 101,429.10 101,499.06 101,499.06
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,225.44 115,323.03 115,323.03 115,488.58 115,488.58 115,568.24 115,568.24
21 Concrete Pan Mixer Unit/Jam 656,748.14 306,859.55 657,304.41 307,300.05 658,247.98 307,512.01 658,702.02
22 Concrete Pump Unit/Jam 250,285.11 233,654.49 250,497.11 233,989.91 250,856.70 234,151.30 251,029.73
23 Concrete Vibrator Unit/Jam 87,170.55 87,244.38 87,244.38 87,369.62 87,369.62 87,429.89 87,429.89
24 Crane 10-15 Ton Unit/Jam 312,611.62 312,876.40 312,876.40 313,325.54 313,325.54 313,541.66 313,541.66
25 Crane On Track 35 Ton Unit/Jam 492,561.10 259,727.53 492,978.31 260,100.37 493,685.99 260,279.78 494,026.51
26 Crane On Track 75-100 Ton Unit/Jam 618,704.80 408,143.25 619,228.85 408,729.15 620,117.76 409,011.08 620,545.50
27 Dump Truck 10 Ton Unit/Jam 414,472.15 386,081.46 414,823.21 386,635.68 415,418.70 386,902.37 415,705.24
28 Dump Truck 3-4 M3 Unit/Jam 213,242.92 210,589.89 213,423.54 210,892.19 213,729.91 211,037.66 213,877.33
29 Excavator 80-140 HP Unit/Jam 483,550.84 304,853.93 483,960.41 305,291.55 484,655.15 305,502.13 484,989.44
30 Flat Bed Truck 3-4 M3 Unit/Jam 493,562.24 370,036.51 493,980.30 370,567.71 494,689.41 370,823.31 495,030.63
31 Fulvi Mixer Unit/Jam 1,445,646.82 926,595.50 1,446,871.30 927,925.64 1,448,948.30 928,565.68 1,449,947.73
32 Generator Set Unit/Jam 436,497.24 412,154.49 436,866.96 412,746.14 437,494.09 413,030.84 437,795.85
33 Hot Recycler Unit/Jam 8,870,104.44 3,027,480.31 8,877,617.53 3,031,826.30 8,890,361.47 3,033,917.53 8,896,493.69
34 Jack Hammer Unit/Jam 57,111.74 57,160.11 57,160.11 57,242.17 57,242.17 57,281.65 57,281.65
35 Launching Gantry Unit/Jam 72,681,198.72 72,742,760.59 72,742,760.59 72,847,183.82 72,847,183.82 72,897,430.92 72,897,430.92
36 Motor Grader > 100 HP Unit/Jam 479,546.28 285,800.56 479,952.46 286,210.83 480,641.44 286,408.25 480,972.97
37 Pedestrian Roller Unit/Jam 94,184.27 94,264.04 94,264.04 94,399.36 94,399.36 94,464.47 94,464.47
38 Pile Driver + Hammer Unit/Jam 313,356.96 107,300.56 313,622.38 107,454.59 314,072.59 107,528.71 314,289.22
39 Rock Drill Breaker Unit/Jam 338,385.47 104,292.13 338,672.09 104,441.85 339,158.26 104,513.89 339,392.20
40 Split Form Paver Unit/Jam 220,431.27 220,617.98 220,617.98 220,934.68 220,934.68 221,087.07 221,087.07
41 Stone Crusher Unit/Jam 735,838.24 590,654.49 736,461.50 591,502.38 737,518.70 591,910.38 738,027.41
42 Tamper Unit/Jam 88,172.51 88,247.19 88,247.19 88,373.87 88,373.87 88,434.83 88,434.83
43 Tandem Roller 6-8 T Unit/Jam 496,565.67 426,193.82 496,986.26 426,805.62 497,699.69 427,100.02 498,042.99
44 Three Wheel Roller 6-8 T Unit/Jam 178,203.00 141,396.07 178,353.94 141,599.04 178,609.97 141,696.71 178,733.17
45 Tire Roller 8-10 T Unit/Jam 455,518.91 252,707.86 455,904.74 253,070.63 456,559.20 253,245.19 456,874.11
46 Track Loader 75-100 HP Unit/Jam 311,354.68 236,662.92 311,618.40 237,002.65 312,065.74 237,166.13 312,280.99
47 Trailer 20 Ton Unit/Jam 527,601.02 382,070.22 528,047.91 382,618.69 528,805.93 382,882.60 529,170.67
48 Trailler 15 Ton Unit/Jam 502,572.51 330,926.96 502,998.19 331,402.01 503,720.25 331,630.60 504,067.70
49 Truck Mixer (agitator) Unit/Jam 610,695.68 416,165.73 611,212.95 416,763.14 612,090.35 417,050.60 612,512.55
50 Vibrating Rammer Unit/Jam 85,166.63 85,238.76 85,238.76 85,361.12 85,361.12 85,420.00 85,420.00
51 Vibratory Roller 5-8 T Unit/Jam 440,501.80 205,575.84 440,874.91 205,870.95 441,507.79 206,012.95 441,812.33
52 Water Pump 70-100 MM Unit/Jam 64,125.46 64,179.77 64,179.77 64,271.91 64,271.91 64,316.24 64,316.24
16 Cold Recycler Unit/Jam 4,909,681.28 9,410,140.20
17 Compressor 4000-6500 L\M Unit/Jam 149,507.97 286,554.44
18 Concrete Breaker Unit/Jam 544,851.20 1,538,119.16
19 Concrete Mixer (350) Unit/Jam 101,344.33 194,241.60
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,392.06 221,166.18
21 Concrete Pan Mixer Unit/Jam 307,043.22 939,148.98
22 Concrete Pump Unit/Jam 233,794.35 464,954.61
23 Concrete Vibrator Unit/Jam 87,296.60 167,317.02
24 Crane 10-15 Ton Unit/Jam 313,063.67 600,033.46
25 Crane On Track 35 Ton Unit/Jam 259,882.99 731,495.10
26 Crane On Track 75-100 Ton Unit/Jam 408,387.55 993,947.90
27 Dump Truck 10 Ton Unit/Jam 386,312.55 769,184.87
28 Dump Truck 3-4 M3 Unit/Jam 210,715.93 406,704.02
29 Excavator 80-140 HP Unit/Jam 305,036.40 763,861.68
30 Flat Bed Truck 3-4 M3 Unit/Jam 370,258.00 833,672.93
31 Fulvi Mixer Unit/Jam 927,150.11 2,297,609.40
32 Generator Set Unit/Jam 412,401.19 815,155.96
33 Hot Recycler Unit/Jam 3,029,292.41 11,659,731.87
34 Jack Hammer Unit/Jam 57,194.33 109,621.50
35 Launching Gantry Unit/Jam 72,786,300.90 139,505,857.30
36 Motor Grader > 100 HP Unit/Jam 285,971.63 742,375.60
37 Pedestrian Roller Unit/Jam 94,320.47 180,779.31
38 Pile Driver + Hammer Unit/Jam 107,364.79 412,226.02
39 Rock Drill Breaker Unit/Jam 104,354.56 434,531.40
40 Split Form Paver Unit/Jam 220,750.03 423,100.52
41 Stone Crusher Unit/Jam 591,008.03 1,278,649.77
42 Tamper Unit/Jam 88,300.01 169,240.21
43 Tandem Roller 6-8 T Unit/Jam 426,448.92 888,188.10
44 Three Wheel Roller 6-8 T Unit/Jam 141,480.70 308,148.97
45 Tire Roller 8-10 T Unit/Jam 252,859.12 687,960.91
46 Track Loader 75-100 HP Unit/Jam 236,804.57 528,871.82
47 Trailer 20 Ton Unit/Jam 382,298.91 878,798.23
48 Trailler 15 Ton Unit/Jam 331,125.04 806,825.00
49 Truck Mixer (agitator) Unit/Jam 416,414.82 993,285.40
50 Vibrating Rammer Unit/Jam 85,289.78 163,470.66
51 Vibratory Roller 5-8 T Unit/Jam 205,698.89 629,692.67
52 Water Pump 70-100 MM Unit/Jam 64,218.19 123,083.79
53 Water Tanker 3000-4500 L Unit/Jam 233,157.10 233,157.10 232,921.45 232,921.45 232,582.63 232,582.63 232,454.79
54 Welding Set Unit/Jam 130,648.37 130,648.37 130,516.33 130,516.33 130,326.47 130,326.47 130,254.84
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 227,127.17 361,499.45 226,897.62 361,134.10 226,567.56 360,608.77 226,443.03
53 Water Tanker 3000-4500 L Unit/Jam 232,454.79 232,651.68 232,651.68 232,985.66 232,985.66 233,146.36 233,146.36
54 Welding Set Unit/Jam 130,254.84 130,365.17 130,365.17 130,552.31 130,552.31 130,642.36 130,642.36
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 360,410.56 226,634.83 360,715.84 226,960.17 361,233.65 227,116.71 361,482.81
53 Water Tanker 3000-4500 L Unit/Jam 232,790.94 446,178.73
54 Welding Set Unit/Jam 130,443.20 250,013.94
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 226,770.48 568,800.89
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar
Jun-20 Jul-20 Aug-20 Sep-20
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.001140456
Min Max Min Max Min Max Min
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24
2 Agregat Pecah Mesin 20-30 mm M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 345,432.81 345,432.81 345,083.70 345,083.70 344,581.71 344,581.71 344,392.32
4 Bahan Agr. Base Kelas A M3 331,374.50 331,374.50 331,039.59 331,039.59 330,558.04 330,558.04 330,376.35
5 Bahan Agr. Base Kelas B M3 311,291.20 311,291.20 310,976.59 310,976.59 310,524.22 310,524.22 310,353.54
6 Bahan Agr. Base Kelas C M3 286,187.07 286,187.07 285,897.83 285,897.83 285,481.94 285,481.94 285,325.03
7 Bahan Agr. Base Kelas C2 M3 261,082.94 261,082.94 260,819.07 260,819.07 260,439.67 260,439.67 260,296.52
8 Bahan Agr. Base Kelas S M3 211,878.85 211,878.85 211,664.71 211,664.71 211,356.81 211,356.81 211,240.64
9 Bahan Pilihan M3 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50
10 Bahan Tanah Timbunan M3 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85
11 Batu Belah/Kerakal M3 340,411.99 340,411.99 340,067.95 340,067.95 339,573.26 339,573.26 339,386.61
12 Batu Kali M3 375,557.77 375,557.77 375,178.21 375,178.21 374,632.44 374,632.44 374,426.53
13 Chipping M3 223,928.83 223,928.83 223,702.51 223,702.51 223,377.10 223,377.10 223,254.32
14 Chipping (kg) Kg 319.32 289.20 319.00 288.91 318.54 288.49 318.36
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 401,666.06 401,666.06 401,260.11 401,260.11 400,676.41 400,676.41 400,456.18
18 Kapur M3 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05
19 Pasir Beton (Kasar) M3 476,978.45 476,978.45 476,496.38 476,496.38 475,803.24 475,803.24 475,541.72
20 Pasir Halus (untuk HRS) M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14
21 Pasir Pasang (Sedang) M3 267,107.93 267,107.93 266,837.98 266,837.98 266,449.81 266,449.81 266,303.36
22 Pasir Urug M3 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65
23 Pasir Urug (ada unsur lempung) M3 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47
24 Sirtu M3 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83
26 Anti Pengelupas Liter 101,420.68 101,420.68 101,318.18 101,318.18 101,170.79 101,170.79 101,115.19
27 Arbocell Kg 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94
28 Asbuton Curah Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Sep-20 Oct-20 Nov-20 Dec-20
No Jenis Bahan Satuan
1.0011404562 1.0019884346 1.0034268027 1.0041189267
Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46
2 Agregat Pecah Mesin 20-30 mm M3 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 344,392.32 344,684.02 344,684.02 345,178.82 345,178.82 345,416.91 345,416.91
4 Bahan Agr. Base Kelas A M3 330,376.35 330,656.18 330,656.18 331,130.84 331,130.84 331,359.25 331,359.25
5 Bahan Agr. Base Kelas B M3 310,353.54 310,616.41 310,616.41 311,062.31 311,062.31 311,276.87 311,276.87
6 Bahan Agr. Base Kelas C M3 285,325.03 285,566.70 285,566.70 285,976.64 285,976.64 286,173.89 286,173.89
7 Bahan Agr. Base Kelas C2 M3 260,296.52 260,516.99 260,516.99 260,890.97 260,890.97 261,070.92 261,070.92
8 Bahan Agr. Base Kelas S M3 211,240.64 211,419.56 211,419.56 211,723.06 211,723.06 211,869.09 211,869.09
9 Bahan Pilihan M3 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97
10 Bahan Tanah Timbunan M3 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27
11 Batu Belah/Kerakal M3 339,386.61 339,674.08 339,674.08 340,161.69 340,161.69 340,396.32 340,396.32
12 Batu Kali M3 374,426.53 374,743.67 374,743.67 375,281.62 375,281.62 375,540.48 375,540.48
13 Chipping M3 223,254.32 223,443.42 223,443.42 223,764.18 223,764.18 223,918.52 223,918.52
14 Chipping (kg) Kg 288.33 318.63 288.57 319.09 288.99 319.31 289.19
15 Filler Cement Kg 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24
16 Gebalan Rumput M' 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 400,456.18 400,795.37 400,795.37 401,370.72 401,370.72 401,647.57 401,647.57
18 Kapur M3 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89
19 Pasir Beton (Kasar) M3 475,541.72 475,944.51 475,944.51 476,627.73 476,627.73 476,956.49 476,956.49
20 Pasir Halus (untuk HRS) M3 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68
21 Pasir Pasang (Sedang) M3 266,303.36 266,528.92 266,528.92 266,911.53 266,911.53 267,095.63 267,095.63
22 Pasir Urug M3 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26
23 Pasir Urug (ada unsur lempung) M3 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03
24 Sirtu M3 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32
26 Anti Pengelupas Liter 101,115.19 101,200.83 101,200.83 101,346.11 101,346.11 101,416.01 101,416.01
27 Arbocell Kg 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89
28 Asbuton Curah Kg 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31
30 Aspal Emulsi (CSS-1) Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020

Rata2 Harga Satuan Dasar 2020


No Jenis Bahan Satuan

Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,815.28 605,307.32
2 Agregat Pecah Mesin 20-30 mm M3 300,776.45 576,483.16
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 344,890.33 661,034.03
4 Bahan Agr. Base Kelas A M3 330,854.10 634,131.48
5 Bahan Agr. Base Kelas B M3 310,802.33 595,699.27
6 Bahan Agr. Base Kelas C M3 285,737.63 547,659.00
7 Bahan Agr. Base Kelas C2 M3 260,672.93 499,618.74
8 Bahan Agr. Base Kelas S M3 211,546.11 405,459.82
9 Bahan Pilihan M3 210,543.52 403,538.21
10 Bahan Tanah Timbunan M3 120,310.58 230,593.26
11 Batu Belah/Kerakal M3 339,877.39 651,425.97
12 Batu Kali M3 374,967.98 718,682.34
13 Chipping M3 223,577.16 428,519.15
14 Chipping (kg) Kg 318.82 580.99
15 Filler Cement Kg 2,005.18 3,843.22
16 Gebalan Rumput M' 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 401,035.27 768,644.22
18 Kapur M3 100,258.82 192,161.05
19 Pasir Beton (Kasar) M3 476,229.38 912,765.01
20 Pasir Halus (untuk HRS) M3 300,776.45 576,483.16
21 Pasir Pasang (Sedang) M3 266,688.45 511,148.40
22 Pasir Urug M3 204,527.99 392,008.55
23 Pasir Urug (ada unsur lempung) M3 160,414.11 307,457.69
24 Sirtu M3 205,530.58 393,930.16
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,181.17 134,512.74
26 Anti Pengelupas Liter 101,261.41 194,082.66
27 Arbocell Kg 142,367.52 272,868.70
28 Asbuton Curah Kg 15,038.82 28,824.16
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,028.47 21,137.72
30 Aspal Emulsi (CSS-1) Kg 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
37 Assetilline Botol 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55
40 Beton B-0 M3 592,942.61 592,942.61 592,343.35 592,343.35 591,481.68 591,481.68 591,156.58
41 Beton K-125 (fc' 10 MPa) M3 613,042.36 613,042.36 612,422.79 612,422.79 611,531.91 611,531.91 611,195.79
42 Beton K-175 (fc' 15 MPa) M3 663,291.74 663,291.74 662,621.37 662,621.37 661,657.48 661,657.48 661,293.80
43 Beton K-250 (fc' 20 MPa) M3 738,665.80 738,665.80 737,919.26 737,919.26 736,845.82 736,845.82 736,440.83
44 Beton K-300 (fc' 25 MPa) M3 768,815.42 768,815.42 768,038.41 768,038.41 766,921.16 766,921.16 766,499.63
45 Beton K-350 (fc' 30 MPa) M3 798,965.05 798,965.05 798,157.57 798,157.57 796,996.50 796,996.50 796,558.44
46 Beton K-400 (fc' 35 MPa) M3 829,114.67 829,114.67 828,276.72 828,276.72 827,071.84 827,071.84 826,617.25
47 Beton K-450 (fc' 40 MPa) M3 869,314.17 869,314.17 868,435.59 868,435.59 867,172.30 867,172.30 866,695.67
48 Beton K-500 (fc' 45 MPa) M3 904,488.73 904,488.73 903,574.60 903,574.60 902,260.19 902,260.19 901,764.28
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13
51 Cat Anti Karat Kg 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25
52 Cat Marka (Non Thermoplas) Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13
53 Cat Marka (Thermoplastic) Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32
54 Cerucuk Diameter 10-15 cm M' 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,311,439.69 1,311,439.69 1,310,114.27 1,310,114.27 1,308,208.48 1,308,208.48 1,307,489.44
57 Curing Compound Liter 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 612,540.74 612,540.74 611,921.67 611,921.67 611,031.53 611,031.53 610,695.68
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 713,961.42 713,961.42 713,239.85 713,239.85 712,202.32 712,202.32 711,810.86
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 904,752.80 904,752.80 903,838.41 903,838.41 902,523.61 902,523.61 902,027.55
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98
63 Minyak Pelumas/Olie Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74
64 Oxygen (Isi 6 M3) Botol 172,716.41 172,716.41 172,541.85 172,541.85 172,290.86 172,290.86 172,196.16
65 Polytene 125 Mikron Kg 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79
66 Sand Sheet Ton 1,386,752.07 1,386,752.07 1,385,350.54 1,385,350.54 1,383,335.31 1,383,335.31 1,382,574.97
67 Seal Coat M2 110,458.17 110,458.17 110,346.53 110,346.53 110,186.01 110,186.01 110,125.45
31 Aspal Minyak (Drum) Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
32 Aspal Modifikasi (BNA) Kg 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55
33 Aspal Modifikasi (JAP-57) Kg 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90
34 Aspal Modifikasi (Retona) Kg 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
35 Aspal Modifikasi (Starbit) Kg 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90
36 Aspal Minyak (Curah) Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
37 Assetilline Botol 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55
38 Bahan Pengawet: Kreosot Liter 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31
39 Bensin Liter 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31
40 Beton B-0 M3 591,156.58 591,657.30 591,657.30 592,506.63 592,506.63 592,915.32 592,915.32
41 Beton K-125 (fc' 10 MPa) M3 611,195.79 611,713.48 611,713.48 612,591.60 612,591.60 613,014.14 613,014.14
42 Beton K-175 (fc' 15 MPa) M3 661,293.80 661,853.93 661,853.93 662,804.03 662,804.03 663,261.20 663,261.20
43 Beton K-250 (fc' 20 MPa) M3 736,440.83 737,064.60 737,064.60 738,122.67 738,122.67 738,631.79 738,631.79
44 Beton K-300 (fc' 25 MPa) M3 766,499.63 767,148.87 767,148.87 768,250.12 768,250.12 768,780.03 768,780.03
45 Beton K-350 (fc' 30 MPa) M3 796,558.44 797,233.14 797,233.14 798,377.58 798,377.58 798,928.27 798,928.27
46 Beton K-400 (fc' 35 MPa) M3 826,617.25 827,317.41 827,317.41 828,505.03 828,505.03 829,076.50 829,076.50
47 Beton K-450 (fc' 40 MPa) M3 866,695.67 867,429.77 867,429.77 868,674.97 868,674.97 869,274.15 869,274.15
48 Beton K-500 (fc' 45 MPa) M3 901,764.28 902,528.08 902,528.08 903,823.67 903,823.67 904,447.10 904,447.10
49 Bunker Oil Liter 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48
50 Cat Kg 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73
51 Cat Anti Karat Kg 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68
52 Cat Marka (Non Thermoplas) Kg 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73
53 Cat Marka (Thermoplastic) Kg 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35
54 Cerucuk Diameter 10-15 cm M' 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97
55 Cold Mix (Aspal Dingin) Kg 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,307,489.44 1,308,596.90 1,308,596.90 1,310,475.40 1,310,475.40 1,311,379.32 1,311,379.32
57 Curing Compound Liter 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 610,695.68 611,212.95 611,212.95 612,090.35 612,090.35 612,512.55 612,512.55
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 711,810.86 712,413.78 712,413.78 713,436.46 713,436.46 713,928.56 713,928.56
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 902,027.55 902,791.58 902,791.58 904,087.55 904,087.55 904,711.15 904,711.15
61 Kerosen/Minyak Tanah Liter 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66
62 Minyak Fluks Liter 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83
63 Minyak Pelumas/Olie Liter 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71
64 Oxygen (Isi 6 M3) Botol 172,196.16 172,342.01 172,342.01 172,589.41 172,589.41 172,708.46 172,708.46
65 Polytene 125 Mikron Kg 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21
66 Sand Sheet Ton 1,382,574.97 1,383,746.03 1,383,746.03 1,385,732.41 1,385,732.41 1,386,688.24 1,386,688.24
67 Seal Coat M2 110,125.45 110,218.73 110,218.73 110,376.95 110,376.95 110,453.08 110,453.08
31 Aspal Minyak (Drum) Kg 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,025.88 19,216.11
37 Assetilline Botol 156,403.76 299,771.24
38 Bahan Pengawet: Kreosot Liter 11,028.47 21,137.72
39 Bensin Liter 11,028.47 21,137.72
40 Beton B-0 M3 592,011.44 1,134,678.67
41 Beton K-125 (fc' 10 MPa) M3 612,079.62 1,173,142.35
42 Beton K-175 (fc' 15 MPa) M3 662,250.08 1,269,301.56
43 Beton K-250 (fc' 20 MPa) M3 737,505.77 1,413,540.37
44 Beton K-300 (fc' 25 MPa) M3 767,608.05 1,471,235.90
45 Beton K-350 (fc' 30 MPa) M3 797,710.32 1,528,931.42
46 Beton K-400 (fc' 35 MPa) M3 827,812.60 1,586,626.95
47 Beton K-450 (fc' 40 MPa) M3 867,948.97 1,663,554.32
48 Beton K-500 (fc' 45 MPa) M3 903,068.29 1,730,865.76
49 Bunker Oil Liter 4,010.35 7,686.44
50 Cat Kg 65,168.23 124,904.69
51 Cat Anti Karat Kg 73,188.94 140,277.57
52 Cat Marka (Non Thermoplas) Kg 65,168.23 124,904.69
53 Cat Marka (Thermoplastic) Kg 45,116.47 86,472.47
54 Cerucuk Diameter 10-15 cm M' 25,064.70 48,040.26
55 Cold Mix (Aspal Dingin) Kg 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,309,380.16 2,509,623.37
57 Curing Compound Liter 50,129.41 96,080.53
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 611,578.79 1,172,182.43
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 712,840.19 1,366,265.09
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 903,331.95 1,731,371.10
61 Kerosen/Minyak Tanah Liter 14,036.23 26,902.55
62 Minyak Fluks Liter 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 48,124.23 92,237.31
64 Oxygen (Isi 6 M3) Botol 172,445.17 330,517.01
65 Polytene 125 Mikron Kg 27,069.88 51,883.48
66 Sand Sheet Ton 1,384,574.27 2,653,744.16
67 Seal Coat M2 110,284.70 211,377.16
68 Seal Guard Kg 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06
69 Semen/PC (50 kg) Zak 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69
70 Semen/PC (kg) Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14
71 Slurry Seal Ton 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92
68 Seal Guard Kg 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28
69 Semen/PC (50 kg) Zak 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21
70 Semen/PC (kg) Kg 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12
71 Slurry Seal Ton 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76
72 Solar Liter 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
73 Thinner Liter 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16
68 Seal Guard Kg 36,093.17 69,177.98
69 Semen/PC (50 kg) Zak 69,178.58 132,591.13
70 Semen/PC (kg) Kg 1,002.59 1,921.61
71 Slurry Seal Ton 40,103.53 76,864.42
72 Solar Liter 12,031.06 23,059.33
73 Thinner Liter 35,090.59 67,256.37
Harga Satuan Dasar
Jun-20 Jul-20 Aug-20 Sep-20
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.001140456
Min Max Min Max Min Max Min
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39
75 Baja Prategang Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25
77 Baja Tulangan (Polos) U25 Kg 12,049.98 10,041.65 12,037.80 10,031.50 12,020.29 10,016.91 12,013.69
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
80 Baja Tulangan (Ulir) D16 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
81 Baja Tulangan (Ulir) D19 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
83 Baja Tulangan (Ulir) D32 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 12,049.98 11,034.65 12,037.80 11,018.60 12,020.29 11,012.55
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,065,192.78 13,065,192.78 13,051,988.34 13,051,988.34 13,033,001.92 13,033,001.92 13,025,838.48
87 Box Culvert Type DUB 200×200 M' 13,868,524.90 13,868,524.90 13,854,508.56 13,854,508.56 13,834,354.74 13,834,354.74 13,826,750.84
88 Box Culvert Type uk 300×200 M' 14,974,110.73 14,974,110.73 14,958,977.02 14,958,977.02 14,937,216.56 14,937,216.56 14,929,006.48
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83
90 Ducting (Kabel Prestress) M' 194,808.04 194,808.04 194,611.15 194,611.15 194,328.06 194,328.06 194,221.25
91 Ducting (Strand Prestress) M' 169,703.91 169,703.91 169,532.40 169,532.40 169,285.78 169,285.78 169,192.74
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
93 Expansion Join Baja Siku M' 2,187,071.70 2,187,071.70 2,184,861.32 2,184,861.32 2,181,683.05 2,181,683.05 2,180,483.91
94 Expansion Join Tipe Rubber M' 1,583,568.44 1,583,568.44 1,581,968.00 1,581,968.00 1,579,666.75 1,579,666.75 1,578,798.50
95 Expansion Join Tipe Torma M' 1,815,530.59 1,815,530.59 1,813,695.71 1,813,695.71 1,811,057.37 1,811,057.37 1,810,061.94
96 Expansion Tipe Joint Asphaltic Plug M' 2,153,934.25 2,153,934.25 2,151,757.36 2,151,757.36 2,148,627.25 2,148,627.25 2,147,446.28
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49
99 Glass Bead Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83
100 Joint Sealent Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32
101 Joint Socket Pile 16×16×16 Set 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78
102 Joint Socket Pile 35×35 Set 786,261.31 786,261.31 785,466.67 785,466.67 784,324.07 784,324.07 783,892.98
103 Kawat Beton Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09
104 Kawat Bronjong Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78
105 Kawat Las Dos 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38
Harga Satuan Dasar per Bulan
Sep-20 Oct-20 Nov-20 Dec-20
No Jenis Bahan Satuan
1.0011404562 1.0019884346 1.0034268027 1.0041189267
Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02
75 Baja Prategang Kg 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90
77 Baja Tulangan (Polos) U25 Kg 10,011.40 12,023.86 10,019.88 12,041.12 10,034.27 12,049.43 10,041.19
78 Baja Tulangan (Polos) U32 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
79 Baja Tulangan (Polos) U36 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
80 Baja Tulangan (Ulir) D16 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
81 Baja Tulangan (Ulir) D19 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
82 Baja Tulangan (Ulir) D24 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
83 Baja Tulangan (Ulir) D32 Kg 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
84 Baja Tulangan (Ulir) D36 Kg 12,013.69 11,021.87 12,023.86 11,037.69 12,041.12 11,045.31 12,049.43
85 Besi Beton Kg 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,025,838.48 13,036,871.52 13,036,871.52 13,055,586.13 13,055,586.13 13,064,591.36 13,064,591.36
87 Box Culvert Type DUB 200×200 M' 13,826,750.84 13,838,462.27 13,838,462.27 13,858,327.57 13,858,327.57 13,867,886.50 13,867,886.50
88 Box Culvert Type uk 300×200 M' 14,929,006.48 14,941,651.54 14,941,651.54 14,963,100.48 14,963,100.48 14,973,421.43 14,973,421.43
89 Casing M2 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55
90 Ducting (Kabel Prestress) M' 194,221.25 194,385.76 194,385.76 194,664.80 194,664.80 194,799.07 194,799.07
91 Ducting (Strand Prestress) M' 169,192.74 169,336.05 169,336.05 169,579.13 169,579.13 169,696.10 169,696.10
92 Expansion Cap M2 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
93 Expansion Join Baja Siku M' 2,180,483.91 2,182,330.81 2,182,330.81 2,185,463.58 2,185,463.58 2,186,971.02 2,186,971.02
94 Expansion Join Tipe Rubber M' 1,578,798.50 1,580,135.76 1,580,135.76 1,582,404.07 1,582,404.07 1,583,495.55 1,583,495.55
95 Expansion Join Tipe Torma M' 1,810,061.94 1,811,595.09 1,811,595.09 1,814,195.66 1,814,195.66 1,815,447.02 1,815,447.02
96 Expansion Tipe Joint Asphaltic Plug M' 2,147,446.28 2,149,265.19 2,149,265.19 2,152,350.49 2,152,350.49 2,153,835.10 2,153,835.10
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81
99 Glass Bead Kg 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32
100 Joint Sealent Kg 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35
101 Joint Socket Pile 16×16×16 Set 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82
102 Joint Socket Pile 35×35 Set 783,892.98 784,556.94 784,556.94 785,683.19 785,683.19 786,225.12 786,225.12
103 Kawat Beton Kg 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62
104 Kawat Bronjong Kg 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04
105 Kawat Las Dos 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41
Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan

Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,044.00 32,667.38
75 Baja Prategang Kg 20,051.76 38,432.21
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 12,031.06 21,054.15
78 Baja Tulangan (Polos) U32 Kg 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 10,025.88 19,216.11
81 Baja Tulangan (Ulir) D19 Kg 10,025.88 19,216.11
82 Baja Tulangan (Ulir) D24 Kg 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 12,031.06 23,059.33
84 Baja Tulangan (Ulir) D36 Kg 11,028.47 22,140.30
85 Besi Beton Kg 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,044,674.76 25,002,074.75
87 Box Culvert Type DUB 200×200 M' 13,846,745.31 26,539,363.19
88 Box Culvert Type uk 300×200 M' 14,950,594.89 28,655,056.39
89 Casing M2 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 194,502.11 372,792.45
91 Ducting (Strand Prestress) M' 169,437.40 324,752.18
92 Expansion Cap M2 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,183,637.05 4,185,267.76
94 Expansion Join Tipe Rubber M' 1,581,081.55 3,030,379.82
95 Expansion Join Tipe Torma M' 1,812,679.42 3,474,271.86
96 Expansion Tipe Joint Asphaltic Plug M' 2,150,551.64 4,121,854.61
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,108.70 80,707.64
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,082.82 61,491.54
99 Glass Bead Kg 70,181.17 134,512.74
100 Joint Sealent Kg 45,116.47 86,472.47
101 Joint Socket Pile 16×16×16 Set 91,235.52 174,866.56
102 Joint Socket Pile 35×35 Set 785,026.54 1,504,621.05
103 Kawat Beton Kg 22,056.94 42,275.43
104 Kawat Bronjong Kg 34,088.00 65,334.76
105 Kawat Las Dos 138,357.17 265,182.25
106 Kayu Acuan (Kelas III/Meranti) M3 4,321,926.81 4,321,926.81 4,317,558.82 4,317,558.82 4,311,278.17 4,311,278.17 4,308,908.52
107 Kayu Perancah (Gelam) M3 2,783,545.80 2,783,545.80 2,780,732.59 2,780,732.59 2,776,687.52 2,776,687.52 2,775,161.34
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,229.08 55,229.08 55,173.27 55,173.27 55,093.01 55,093.01 55,062.73
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34
110 Marmer Nama Jembatan Buah 602,499.09 602,499.09 601,890.17 601,890.17 601,014.61 601,014.61 600,684.27
111 Mata Kucing Buah 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19
112 Matras Concrete (Tebal=10 cm) M2 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65
113 Mini Pile 16×16×16 M' 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10
114 Mini Timber Pile Buah 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49
115 Multipleks 12 mm Lbr 286,187.07 286,187.07 285,897.83 285,897.83 285,481.94 285,481.94 285,325.03
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53
117 Paving Block (Model Bata 8 cm) M2 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,810,119.98 66,810,119.98 66,742,597.80 66,742,597.80 66,645,508.95 66,645,508.95 66,608,877.97
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,647,586.29 94,647,586.29 94,551,929.95 94,551,929.95 94,414,387.54 94,414,387.54 94,362,493.70
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,897,339.42 180,897,339.42 180,714,514.08 180,714,514.08 180,451,633.03 180,451,633.03 180,352,449.77
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 237,218,954.40 237,218,954.40 236,979,207.17 236,979,207.17 236,634,479.23 236,634,479.23 236,504,415.67
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 302,391,281.02 302,391,281.02 302,085,666.86 302,085,666.86 301,646,230.11 301,646,230.11 301,480,433.56
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,834,286.75 364,834,286.75 364,465,564.07 364,465,564.07 363,935,384.79 363,935,384.79 363,735,351.69
124 Pelat Rambu (Eng. Grade) Buah 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50
125 Pelat Rambu (High L Grade) Buah 246,020.46 246,020.46 245,771.82 245,771.82 245,414.30 245,414.30 245,279.41
126 Pemantul Cahaya (Reflector) Buah 15,074.53 15,074.53 15,059.29 15,059.29 15,037.39 15,037.39 15,029.12
127 Pipa Baja D10" Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23
128 Pipa Drainase Baja Dia 3" M' 276,145.42 276,145.42 275,866.33 275,866.33 275,465.03 275,465.03 275,313.63
129 Pipa Galvanis Dia 1,5" M' 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28
130 Pipa Galvanis Dia 2" M' 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79
131 Pipa Galvanis Dia 3" M' 242,201.62 242,201.62 241,956.84 241,956.84 241,604.87 241,604.87 241,472.07
132 Pipa Porus M' 45,224.59 45,224.59 45,178.88 45,178.88 45,113.16 45,113.16 45,088.36
133 Pipa PVC Dia 4" M' 209,870.52 209,870.52 209,658.41 209,658.41 209,353.42 209,353.42 209,238.36
134 Plastik Filter M2 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06
135 Rel Pengaman M' 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,064,563.55 2,064,563.55 2,062,476.98 2,062,476.98 2,059,476.75 2,059,476.75 2,058,344.78
137 Strip Bearing Buah 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24
138 Tiang Pancang Baja Diameter 400 M' 731,032.23 731,032.23 730,293.41 730,293.41 729,231.07 729,231.07 728,830.25
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 893,706.98 893,706.98 892,803.75 892,803.75 891,505.01 891,505.01 891,015.01
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,869,755.51 1,869,755.51 1,867,865.83 1,867,865.83 1,865,148.69 1,865,148.69 1,864,123.53
106 Kayu Acuan (Kelas III/Meranti) M3 4,308,908.52 4,312,558.22 4,312,558.22 4,318,748.96 4,318,748.96 4,321,727.86 4,321,727.86
107 Kayu Perancah (Gelam) M3 2,775,161.34 2,777,511.94 2,777,511.94 2,781,499.10 2,781,499.10 2,783,417.66 2,783,417.66
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,062.73 55,109.36 55,109.36 55,188.47 55,188.47 55,226.54 55,226.54
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30
110 Marmer Nama Jembatan Buah 600,684.27 601,193.06 601,193.06 602,056.08 602,056.08 602,471.36 602,471.36
111 Mata Kucing Buah 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79
112 Matras Concrete (Tebal=10 cm) M2 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48
113 Mini Pile 16×16×16 M' 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17
114 Mini Timber Pile Buah 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81
115 Multipleks 12 mm Lbr 285,325.03 285,566.70 285,566.70 285,976.64 285,976.64 286,173.89 286,173.89
116 Paku Kg 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14
117 Paving Block (Model Bata 8 cm) M2 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,608,877.97 66,665,296.52 66,665,296.52 66,760,995.46 66,760,995.46 66,807,044.55 66,807,044.55
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,362,493.70 94,442,419.90 94,442,419.90 94,577,993.29 94,577,993.29 94,643,229.43 94,643,229.43
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,352,449.77 180,505,210.52 180,505,210.52 180,764,328.23 180,764,328.23 180,889,012.28 180,889,012.28
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,504,415.67 236,704,737.84 236,704,737.84 237,044,530.74 237,044,530.74 237,208,034.64 237,208,034.64
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 301,480,433.56 301,735,791.22 301,735,791.22 302,168,937.09 302,168,937.09 302,377,361.22 302,377,361.22
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 363,735,351.69 364,043,440.04 364,043,440.04 364,566,029.39 364,566,029.39 364,817,492.56 364,817,492.56
124 Pelat Rambu (Eng. Grade) Buah 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97
125 Pelat Rambu (High L Grade) Buah 245,279.41 245,487.17 245,487.17 245,839.57 245,839.57 246,009.14 246,009.14
126 Pemantul Cahaya (Reflector) Buah 15,029.12 15,041.85 15,041.85 15,063.44 15,063.44 15,073.83 15,073.83
127 Pipa Baja D10" Kg 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74
128 Pipa Drainase Baja Dia 3" M' 275,313.63 275,546.82 275,546.82 275,942.37 275,942.37 276,132.70 276,132.70
129 Pipa Galvanis Dia 1,5" M' 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41
130 Pipa Galvanis Dia 2" M' 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38
131 Pipa Galvanis Dia 3" M' 241,472.07 241,676.60 241,676.60 242,023.53 242,023.53 242,190.47 242,190.47
132 Pipa Porus M' 45,088.36 45,126.55 45,126.55 45,191.33 45,191.33 45,222.50 45,222.50
133 Pipa PVC Dia 4" M' 209,238.36 209,415.58 209,415.58 209,716.20 209,716.20 209,860.86 209,860.86
134 Plastik Filter M2 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28
135 Rel Pengaman M' 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,058,344.78 2,060,088.22 2,060,088.22 2,063,045.51 2,063,045.51 2,064,468.51 2,064,468.51
137 Strip Bearing Buah 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46
138 Tiang Pancang Baja Diameter 400 M' 728,830.25 729,447.58 729,447.58 730,494.71 730,494.71 730,998.58 730,998.58
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 891,015.01 891,769.71 891,769.71 893,049.85 893,049.85 893,665.84 893,665.84
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,864,123.53 1,865,702.47 1,865,702.47 1,868,380.71 1,868,380.71 1,869,669.44 1,869,669.44
106 Kayu Acuan (Kelas III/Meranti) M3 4,315,139.51 8,270,611.77
107 Kayu Perancah (Gelam) M3 2,779,174.43 5,326,704.42
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,142.35 105,688.58
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,245.88 182,553.00
110 Marmer Nama Jembatan Buah 601,552.91 1,152,966.32
111 Mata Kucing Buah 158,408.93 303,614.47
112 Matras Concrete (Tebal=10 cm) M2 147,380.46 282,476.75
113 Mini Pile 16×16×16 M' 136,351.99 261,339.03
114 Mini Timber Pile Buah 32,082.82 61,491.54
115 Multipleks 12 mm Lbr 285,737.63 547,659.00
116 Paku Kg 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 95,245.88 182,553.00
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,705,199.14 127,850,514.15
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,498,948.57 181,121,401.58
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,613,252.22 346,172,374.19
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,846,417.87 453,951,666.24
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 301,916,395.69 578,668,033.59
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,261,338.86 698,161,463.49
124 Pelat Rambu (Eng. Grade) Buah 210,543.52 403,538.21
125 Pelat Rambu (High L Grade) Buah 245,634.10 470,794.58
126 Pemantul Cahaya (Reflector) Buah 15,050.85 28,847.22
127 Pipa Baja D10" Kg 23,059.53 44,197.04
128 Pipa Drainase Baja Dia 3" M' 275,711.75 528,442.90
129 Pipa Galvanis Dia 1,5" M' 180,465.87 345,889.90
130 Pipa Galvanis Dia 2" M' 205,530.58 393,930.16
131 Pipa Galvanis Dia 3" M' 241,821.26 463,486.70
132 Pipa Porus M' 45,153.56 86,543.57
133 Pipa PVC Dia 4" M' 209,540.93 401,616.60
134 Plastik Filter M2 36,093.17 69,177.98
135 Rel Pengaman M' 170,439.99 326,673.79
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,061,321.29 3,950,831.27
137 Strip Bearing Buah 315,815.28 605,307.32
138 Tiang Pancang Baja Diameter 400 M' 729,884.19 1,398,932.47
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 892,303.48 1,710,233.38
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,866,819.18 3,578,038.83