2019 / 2020
Harga Satuan Dasar per Bulan
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
No Jenis Upah Satuan Sep-19
1.0027056533 1.0040879718 1.0041159231 1.0027897387 1.0013573407 1.0011405724 1.0023158394 1.0037735472
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
1 Pekerja OH 78,120 96,000 78,331.37 96,259.74 78,439.35 96,392.45 78,441.54 96,395.13 78,337.93 96,267.81 78,226.04 96,130.30 78,209.10 96,109.49 78,300.91 96,222.32 78,414.79 96,362.26
2 Tukang OH 98,280 108,000 98,545.91 108,292.21 98,681.77 108,441.50 98,684.51 108,444.52 98,554.18 108,301.29 98,413.40 108,146.59 98,392.10 108,123.18 98,507.60 108,250.11 98,650.86 108,407.54
3 Mandor OH 110,880 124,000 111,180.00 124,335.50 111,333.27 124,506.91 111,336.37 124,510.37 111,189.33 124,345.93 111,030.50 124,168.31 111,006.47 124,141.43 111,136.78 124,287.16 111,298.41 124,467.92
4 Operator OH 200,000 255,000 200,541.13 255,689.94 200,817.59 256,042.43 200,823.18 256,049.56 200,557.95 255,711.38 200,271.47 255,346.12 200,228.11 255,290.85 200,463.17 255,590.54 200,754.71 255,962.25
5 Pembantu Operator OH 120,000 160,000 120,324.68 160,432.90 120,490.56 160,654.08 120,493.91 160,658.55 120,334.77 160,446.36 120,162.88 160,217.17 120,136.87 160,182.49 120,277.90 160,370.53 120,452.83 160,603.77
6 Sopir OH 96,000 120,000 96,259.74 120,324.68 96,392.45 120,490.56 96,395.13 120,493.91 96,267.81 120,334.77 96,130.30 120,162.88 96,109.49 120,136.87 96,222.32 120,277.90 96,362.26 120,452.83
7 Pembantu Sopir OH 80,000 104,000 80,216.45 104,281.39 80,327.04 104,425.15 80,329.27 104,428.06 80,223.18 104,290.13 80,108.59 104,141.16 80,091.25 104,118.62 80,185.27 104,240.85 80,301.88 104,392.45
8 Mekanik OH 108,000 144,000 108,292.21 144,389.61 108,441.50 144,588.67 108,444.52 144,592.69 108,301.29 144,401.72 108,146.59 144,195.46 108,123.18 144,164.24 108,250.11 144,333.48 108,407.54 144,543.39
9 Pembantu Mekanik OH 100,000 104,000 100,270.57 104,281.39 100,408.80 104,425.15 100,411.59 104,428.06 100,278.97 104,290.13 100,135.73 104,141.16 100,114.06 104,118.62 100,231.58 104,240.85 100,377.35 104,392.45
10 Kepala Tukang OH 108,000 120,000 108,292.21 120,324.68 108,441.50 120,490.56 108,444.52 120,493.91 108,301.29 120,334.77 108,146.59 120,162.88 108,123.18 120,136.87 108,250.11 120,277.90 108,407.54 120,452.83
11 Pemasak Aspal OH 88,000 120,000 88,238.10 120,324.68 88,359.74 120,490.56 88,362.20 120,493.91 88,245.50 120,334.77 88,119.45 120,162.88 88,100.37 120,136.87 88,203.79 120,277.90 88,332.07 120,452.83
Min Max
1 Pekerja OH 120,310.58 120,310.58
2 Tukang OH 135,349.40 135,349.40
3 Mandor OH 155,401.17 155,401.17
4 Operator OH 320,828.22 320,828.22
5 Pembantu Operator OH 200,517.64 200,517.64
6 Sopir OH 150,388.23 150,388.23
7 Pembantu Sopir OH 130,336.46 130,336.46
8 Mekanik OH 180,465.87 180,465.87
9 Pembantu Mekanik OH 130,336.46 130,336.46
10 Kepala Tukang OH 150,388.23 150,388.23
11 Pemasak Aspal OH 150,388.23 150,388.23
Min Max
1 Aggregat (Chip) Spreader Unit/Jam 472,605.74 960,575.39
2 Asphalt Distribution Unit/Jam 290,988.67 640,700.13
3 Asphalt Finisher Unit/Jam 213,726.16 1,209,528.71
4 Asphalt Liquid Mixer Unit/Jam 76,259.10 209,262.65
5 Asphalt Liquid Mixer (KAP 20000) Unit/Jam 102,347.74 196,164.79
6 Asphalt Mixing Plant Unit/Jam 1,143,886.50 7,044,998.02
7 Asphalt Sprayer Unit/Jam 94,320.47 180,779.31
8 Asphalt Tanker Unit/Jam 441,500.05 916,020.96
9 Blending Equipment Unit/Jam 143,487.52 358,112.75
10 Bore Pile Machine Unit/Jam 395,343.23 1,050,166.83
11 Bore Pile Machine Dia 60 Unit/Jam 258,879.58 1,020,323.31
12 Bore Pile Machine Dia 80 Unit/Jam 1,023,477.40 1,961,647.86
13 Bulldozer 100-150 HP Unit/Jam 401,363.69 949,411.13
14 Cement Tanker Unit/Jam 373,268.23 823,398.61
15 Cold Milling Unit/Jam 582,980.75 1,774,590.83
16 Cold Recycler Unit/Jam 4,917,403.73 4,917,403.73 4,912,433.92 4,912,433.92 4,905,287.92 4,905,287.92 4,902,591.78
17 Compressor 4000-6500 L\M Unit/Jam 149,743.13 149,743.13 149,591.80 149,591.80 149,374.19 149,374.19 149,292.09
18 Concrete Breaker Unit/Jam 545,708.20 1,040,315.10 545,156.68 1,039,263.69 544,363.65 1,037,751.90 544,064.45
19 Concrete Mixer (350) Unit/Jam 101,503.74 101,503.74 101,401.15 101,401.15 101,253.64 101,253.64 101,197.99
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,573.56 115,573.56 115,456.75 115,456.75 115,288.80 115,288.80 115,225.44
21 Concrete Pan Mixer Unit/Jam 307,526.17 658,732.34 307,215.36 658,066.59 306,768.47 657,109.31 306,599.85
22 Concrete Pump Unit/Jam 234,162.08 251,041.29 233,925.42 250,787.57 233,585.14 250,422.76 233,456.75
23 Concrete Vibrator Unit/Jam 87,433.91 87,433.91 87,345.54 87,345.54 87,218.49 87,218.49 87,170.55
24 Crane 10-15 Ton Unit/Jam 313,556.09 313,556.09 313,239.20 313,239.20 312,783.53 312,783.53 312,611.62
25 Crane On Track 35 Ton Unit/Jam 260,291.76 494,049.25 260,028.69 493,549.94 259,650.43 492,831.98 259,507.72
26 Crane On Track 75-100 Ton Unit/Jam 409,029.90 620,574.06 408,616.51 619,946.88 408,022.11 619,045.05 407,797.85
27 Dump Truck 10 Ton Unit/Jam 386,920.18 415,724.37 386,529.14 415,304.22 385,966.86 414,700.08 385,754.72
28 Dump Truck 3-4 M3 Unit/Jam 211,047.37 213,887.18 210,834.07 213,671.01 210,527.38 213,360.19 210,411.66
29 Excavator 80-140 HP Unit/Jam 305,516.19 485,011.77 305,207.42 484,521.59 304,763.44 483,816.76 304,595.93
30 Flat Bed Truck 3-4 M3 Unit/Jam 370,840.38 495,053.42 370,465.59 494,553.09 369,926.68 493,833.68 369,723.35
31 Fulvi Mixer Unit/Jam 928,608.43 1,450,014.48 927,669.92 1,448,549.01 926,320.47 1,446,441.84 925,811.32
32 Generator Set Unit/Jam 413,049.85 437,816.01 412,632.40 437,373.52 412,032.16 436,737.29 411,805.69
33 Hot Recycler Unit/Jam 3,034,057.20 8,896,903.24 3,030,990.80 8,887,911.51 3,026,581.69 8,874,982.48 3,024,918.17
34 Jack Hammer Unit/Jam 57,284.29 57,284.29 57,226.39 57,226.39 57,143.15 57,143.15 57,111.74
35 Launching Gantry Unit/Jam 72,900,786.72 72,900,786.72 72,827,108.96 72,827,108.96 72,721,169.11 72,721,169.11 72,681,198.72
36 Motor Grader > 100 HP Unit/Jam 286,421.43 480,995.11 286,131.96 480,508.99 285,715.73 479,810.00 285,558.69
37 Pedestrian Roller Unit/Jam 94,468.82 94,468.82 94,373.35 94,373.35 94,236.06 94,236.06 94,184.27
38 Pile Driver + Hammer Unit/Jam 107,533.66 314,303.69 107,424.98 313,986.04 107,268.71 313,529.29 107,209.75
39 Rock Drill Breaker Unit/Jam 104,518.70 339,407.82 104,413.07 339,064.80 104,261.18 338,571.57 104,203.87
40 Split Form Paver Unit/Jam 221,097.25 221,097.25 220,873.79 220,873.79 220,552.49 220,552.49 220,431.27
41 Stone Crusher Unit/Jam 591,937.62 738,061.39 591,339.38 737,315.46 590,479.17 736,242.90 590,154.62
42 Tamper Unit/Jam 88,438.90 88,438.90 88,349.52 88,349.52 88,221.00 88,221.00 88,172.51
43 Tandem Roller 6-8 T Unit/Jam 427,119.68 498,065.91 426,688.01 497,562.54 426,067.31 496,838.75 425,833.13
44 Three Wheel Roller 6-8 T Unit/Jam 141,703.23 178,741.40 141,560.02 178,560.75 141,354.10 178,301.00 141,276.40
45 Tire Roller 8-10 T Unit/Jam 253,256.84 456,895.14 253,000.89 456,433.38 252,632.85 455,769.42 252,494.00
46 Track Loader 75-100 HP Unit/Jam 237,177.04 312,295.36 236,937.34 311,979.74 236,592.67 311,525.91 236,462.63
47 Trailer 20 Ton Unit/Jam 382,900.23 529,195.03 382,513.25 528,660.20 381,956.82 527,891.17 381,746.88
48 Trailler 15 Ton Unit/Jam 331,645.87 504,090.91 331,310.69 503,581.44 330,828.74 502,848.89 330,646.90
49 Truck Mixer (agitator) Unit/Jam 417,069.80 612,540.74 416,648.29 611,921.67 416,042.20 611,031.53 415,813.53
50 Vibrating Rammer Unit/Jam 85,423.94 85,423.94 85,337.60 85,337.60 85,213.46 85,213.46 85,166.63
51 Vibratory Roller 5-8 T Unit/Jam 206,022.43 441,832.67 205,814.21 441,386.12 205,514.82 440,744.05 205,401.86
52 Water Pump 70-100 MM Unit/Jam 64,319.20 64,319.20 64,254.19 64,254.19 64,160.72 64,160.72 64,125.46
16 Cold Recycler Unit/Jam 4,902,591.78 4,906,744.34 4,906,744.34 4,913,788.04 4,913,788.04 4,917,177.37 4,917,177.37
17 Compressor 4000-6500 L\M Unit/Jam 149,292.09 149,418.54 149,418.54 149,633.03 149,633.03 149,736.24 149,736.24
18 Concrete Breaker Unit/Jam 1,037,181.51 544,525.28 1,038,060.02 545,306.95 1,039,550.17 545,683.08 1,040,267.21
19 Concrete Mixer (350) Unit/Jam 101,197.99 101,283.71 101,283.71 101,429.10 101,429.10 101,499.06 101,499.06
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,225.44 115,323.03 115,323.03 115,488.58 115,488.58 115,568.24 115,568.24
21 Concrete Pan Mixer Unit/Jam 656,748.14 306,859.55 657,304.41 307,300.05 658,247.98 307,512.01 658,702.02
22 Concrete Pump Unit/Jam 250,285.11 233,654.49 250,497.11 233,989.91 250,856.70 234,151.30 251,029.73
23 Concrete Vibrator Unit/Jam 87,170.55 87,244.38 87,244.38 87,369.62 87,369.62 87,429.89 87,429.89
24 Crane 10-15 Ton Unit/Jam 312,611.62 312,876.40 312,876.40 313,325.54 313,325.54 313,541.66 313,541.66
25 Crane On Track 35 Ton Unit/Jam 492,561.10 259,727.53 492,978.31 260,100.37 493,685.99 260,279.78 494,026.51
26 Crane On Track 75-100 Ton Unit/Jam 618,704.80 408,143.25 619,228.85 408,729.15 620,117.76 409,011.08 620,545.50
27 Dump Truck 10 Ton Unit/Jam 414,472.15 386,081.46 414,823.21 386,635.68 415,418.70 386,902.37 415,705.24
28 Dump Truck 3-4 M3 Unit/Jam 213,242.92 210,589.89 213,423.54 210,892.19 213,729.91 211,037.66 213,877.33
29 Excavator 80-140 HP Unit/Jam 483,550.84 304,853.93 483,960.41 305,291.55 484,655.15 305,502.13 484,989.44
30 Flat Bed Truck 3-4 M3 Unit/Jam 493,562.24 370,036.51 493,980.30 370,567.71 494,689.41 370,823.31 495,030.63
31 Fulvi Mixer Unit/Jam 1,445,646.82 926,595.50 1,446,871.30 927,925.64 1,448,948.30 928,565.68 1,449,947.73
32 Generator Set Unit/Jam 436,497.24 412,154.49 436,866.96 412,746.14 437,494.09 413,030.84 437,795.85
33 Hot Recycler Unit/Jam 8,870,104.44 3,027,480.31 8,877,617.53 3,031,826.30 8,890,361.47 3,033,917.53 8,896,493.69
34 Jack Hammer Unit/Jam 57,111.74 57,160.11 57,160.11 57,242.17 57,242.17 57,281.65 57,281.65
35 Launching Gantry Unit/Jam 72,681,198.72 72,742,760.59 72,742,760.59 72,847,183.82 72,847,183.82 72,897,430.92 72,897,430.92
36 Motor Grader > 100 HP Unit/Jam 479,546.28 285,800.56 479,952.46 286,210.83 480,641.44 286,408.25 480,972.97
37 Pedestrian Roller Unit/Jam 94,184.27 94,264.04 94,264.04 94,399.36 94,399.36 94,464.47 94,464.47
38 Pile Driver + Hammer Unit/Jam 313,356.96 107,300.56 313,622.38 107,454.59 314,072.59 107,528.71 314,289.22
39 Rock Drill Breaker Unit/Jam 338,385.47 104,292.13 338,672.09 104,441.85 339,158.26 104,513.89 339,392.20
40 Split Form Paver Unit/Jam 220,431.27 220,617.98 220,617.98 220,934.68 220,934.68 221,087.07 221,087.07
41 Stone Crusher Unit/Jam 735,838.24 590,654.49 736,461.50 591,502.38 737,518.70 591,910.38 738,027.41
42 Tamper Unit/Jam 88,172.51 88,247.19 88,247.19 88,373.87 88,373.87 88,434.83 88,434.83
43 Tandem Roller 6-8 T Unit/Jam 496,565.67 426,193.82 496,986.26 426,805.62 497,699.69 427,100.02 498,042.99
44 Three Wheel Roller 6-8 T Unit/Jam 178,203.00 141,396.07 178,353.94 141,599.04 178,609.97 141,696.71 178,733.17
45 Tire Roller 8-10 T Unit/Jam 455,518.91 252,707.86 455,904.74 253,070.63 456,559.20 253,245.19 456,874.11
46 Track Loader 75-100 HP Unit/Jam 311,354.68 236,662.92 311,618.40 237,002.65 312,065.74 237,166.13 312,280.99
47 Trailer 20 Ton Unit/Jam 527,601.02 382,070.22 528,047.91 382,618.69 528,805.93 382,882.60 529,170.67
48 Trailler 15 Ton Unit/Jam 502,572.51 330,926.96 502,998.19 331,402.01 503,720.25 331,630.60 504,067.70
49 Truck Mixer (agitator) Unit/Jam 610,695.68 416,165.73 611,212.95 416,763.14 612,090.35 417,050.60 612,512.55
50 Vibrating Rammer Unit/Jam 85,166.63 85,238.76 85,238.76 85,361.12 85,361.12 85,420.00 85,420.00
51 Vibratory Roller 5-8 T Unit/Jam 440,501.80 205,575.84 440,874.91 205,870.95 441,507.79 206,012.95 441,812.33
52 Water Pump 70-100 MM Unit/Jam 64,125.46 64,179.77 64,179.77 64,271.91 64,271.91 64,316.24 64,316.24
16 Cold Recycler Unit/Jam 4,909,681.28 9,410,140.20
17 Compressor 4000-6500 L\M Unit/Jam 149,507.97 286,554.44
18 Concrete Breaker Unit/Jam 544,851.20 1,538,119.16
19 Concrete Mixer (350) Unit/Jam 101,344.33 194,241.60
20 Concrete Mixer 0.3-0.6 M3 Unit/Jam 115,392.06 221,166.18
21 Concrete Pan Mixer Unit/Jam 307,043.22 939,148.98
22 Concrete Pump Unit/Jam 233,794.35 464,954.61
23 Concrete Vibrator Unit/Jam 87,296.60 167,317.02
24 Crane 10-15 Ton Unit/Jam 313,063.67 600,033.46
25 Crane On Track 35 Ton Unit/Jam 259,882.99 731,495.10
26 Crane On Track 75-100 Ton Unit/Jam 408,387.55 993,947.90
27 Dump Truck 10 Ton Unit/Jam 386,312.55 769,184.87
28 Dump Truck 3-4 M3 Unit/Jam 210,715.93 406,704.02
29 Excavator 80-140 HP Unit/Jam 305,036.40 763,861.68
30 Flat Bed Truck 3-4 M3 Unit/Jam 370,258.00 833,672.93
31 Fulvi Mixer Unit/Jam 927,150.11 2,297,609.40
32 Generator Set Unit/Jam 412,401.19 815,155.96
33 Hot Recycler Unit/Jam 3,029,292.41 11,659,731.87
34 Jack Hammer Unit/Jam 57,194.33 109,621.50
35 Launching Gantry Unit/Jam 72,786,300.90 139,505,857.30
36 Motor Grader > 100 HP Unit/Jam 285,971.63 742,375.60
37 Pedestrian Roller Unit/Jam 94,320.47 180,779.31
38 Pile Driver + Hammer Unit/Jam 107,364.79 412,226.02
39 Rock Drill Breaker Unit/Jam 104,354.56 434,531.40
40 Split Form Paver Unit/Jam 220,750.03 423,100.52
41 Stone Crusher Unit/Jam 591,008.03 1,278,649.77
42 Tamper Unit/Jam 88,300.01 169,240.21
43 Tandem Roller 6-8 T Unit/Jam 426,448.92 888,188.10
44 Three Wheel Roller 6-8 T Unit/Jam 141,480.70 308,148.97
45 Tire Roller 8-10 T Unit/Jam 252,859.12 687,960.91
46 Track Loader 75-100 HP Unit/Jam 236,804.57 528,871.82
47 Trailer 20 Ton Unit/Jam 382,298.91 878,798.23
48 Trailler 15 Ton Unit/Jam 331,125.04 806,825.00
49 Truck Mixer (agitator) Unit/Jam 416,414.82 993,285.40
50 Vibrating Rammer Unit/Jam 85,289.78 163,470.66
51 Vibratory Roller 5-8 T Unit/Jam 205,698.89 629,692.67
52 Water Pump 70-100 MM Unit/Jam 64,218.19 123,083.79
53 Water Tanker 3000-4500 L Unit/Jam 233,157.10 233,157.10 232,921.45 232,921.45 232,582.63 232,582.63 232,454.79
54 Welding Set Unit/Jam 130,648.37 130,648.37 130,516.33 130,516.33 130,326.47 130,326.47 130,254.84
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 227,127.17 361,499.45 226,897.62 361,134.10 226,567.56 360,608.77 226,443.03
53 Water Tanker 3000-4500 L Unit/Jam 232,454.79 232,651.68 232,651.68 232,985.66 232,985.66 233,146.36 233,146.36
54 Welding Set Unit/Jam 130,254.84 130,365.17 130,365.17 130,552.31 130,552.31 130,642.36 130,642.36
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 360,410.56 226,634.83 360,715.84 226,960.17 361,233.65 227,116.71 361,482.81
53 Water Tanker 3000-4500 L Unit/Jam 232,790.94 446,178.73
54 Welding Set Unit/Jam 130,443.20 250,013.94
55 Wheel Loader 1.0-1.6 M3 Unit/Jam 226,770.48 568,800.89
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar
Jun-20 Jul-20 Aug-20 Sep-20
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.001140456
Min Max Min Max Min Max Min
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24
2 Agregat Pecah Mesin 20-30 mm M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 345,432.81 345,432.81 345,083.70 345,083.70 344,581.71 344,581.71 344,392.32
4 Bahan Agr. Base Kelas A M3 331,374.50 331,374.50 331,039.59 331,039.59 330,558.04 330,558.04 330,376.35
5 Bahan Agr. Base Kelas B M3 311,291.20 311,291.20 310,976.59 310,976.59 310,524.22 310,524.22 310,353.54
6 Bahan Agr. Base Kelas C M3 286,187.07 286,187.07 285,897.83 285,897.83 285,481.94 285,481.94 285,325.03
7 Bahan Agr. Base Kelas C2 M3 261,082.94 261,082.94 260,819.07 260,819.07 260,439.67 260,439.67 260,296.52
8 Bahan Agr. Base Kelas S M3 211,878.85 211,878.85 211,664.71 211,664.71 211,356.81 211,356.81 211,240.64
9 Bahan Pilihan M3 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50
10 Bahan Tanah Timbunan M3 120,499.82 120,499.82 120,378.03 120,378.03 120,202.92 120,202.92 120,136.85
11 Batu Belah/Kerakal M3 340,411.99 340,411.99 340,067.95 340,067.95 339,573.26 339,573.26 339,386.61
12 Batu Kali M3 375,557.77 375,557.77 375,178.21 375,178.21 374,632.44 374,632.44 374,426.53
13 Chipping M3 223,928.83 223,928.83 223,702.51 223,702.51 223,377.10 223,377.10 223,254.32
14 Chipping (kg) Kg 319.32 289.20 319.00 288.91 318.54 288.49 318.36
15 Filler Cement Kg 2,008.33 2,008.33 2,006.30 2,006.30 2,003.38 2,003.38 2,002.28
16 Gebalan Rumput M' 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 401,666.06 401,666.06 401,260.11 401,260.11 400,676.41 400,676.41 400,456.18
18 Kapur M3 100,416.52 100,416.52 100,315.03 100,315.03 100,169.10 100,169.10 100,114.05
19 Pasir Beton (Kasar) M3 476,978.45 476,978.45 476,496.38 476,496.38 475,803.24 475,803.24 475,541.72
20 Pasir Halus (untuk HRS) M3 301,249.55 301,249.55 300,945.08 300,945.08 300,507.31 300,507.31 300,342.14
21 Pasir Pasang (Sedang) M3 267,107.93 267,107.93 266,837.98 266,837.98 266,449.81 266,449.81 266,303.36
22 Pasir Urug M3 204,849.69 204,849.69 204,642.66 204,642.66 204,344.97 204,344.97 204,232.65
23 Pasir Urug (ada unsur lempung) M3 160,666.42 160,666.42 160,504.05 160,504.05 160,270.56 160,270.56 160,182.47
24 Sirtu M3 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83
26 Anti Pengelupas Liter 101,420.68 101,420.68 101,318.18 101,318.18 101,170.79 101,170.79 101,115.19
27 Arbocell Kg 142,591.45 142,591.45 142,447.34 142,447.34 142,240.13 142,240.13 142,161.94
28 Asbuton Curah Kg 15,062.48 15,062.48 15,047.25 15,047.25 15,025.37 15,025.37 15,017.11
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55
30 Aspal Emulsi (CSS-1) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Harga Satuan Dasar per Bulan
Sep-20 Oct-20 Nov-20 Dec-20
No Jenis Bahan Satuan
1.0011404562 1.0019884346 1.0034268027 1.0041189267
Max Min Max Min Max Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46
2 Agregat Pecah Mesin 20-30 mm M3 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 344,392.32 344,684.02 344,684.02 345,178.82 345,178.82 345,416.91 345,416.91
4 Bahan Agr. Base Kelas A M3 330,376.35 330,656.18 330,656.18 331,130.84 331,130.84 331,359.25 331,359.25
5 Bahan Agr. Base Kelas B M3 310,353.54 310,616.41 310,616.41 311,062.31 311,062.31 311,276.87 311,276.87
6 Bahan Agr. Base Kelas C M3 285,325.03 285,566.70 285,566.70 285,976.64 285,976.64 286,173.89 286,173.89
7 Bahan Agr. Base Kelas C2 M3 260,296.52 260,516.99 260,516.99 260,890.97 260,890.97 261,070.92 261,070.92
8 Bahan Agr. Base Kelas S M3 211,240.64 211,419.56 211,419.56 211,723.06 211,723.06 211,869.09 211,869.09
9 Bahan Pilihan M3 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97
10 Bahan Tanah Timbunan M3 120,136.85 120,238.61 120,238.61 120,411.22 120,411.22 120,494.27 120,494.27
11 Batu Belah/Kerakal M3 339,386.61 339,674.08 339,674.08 340,161.69 340,161.69 340,396.32 340,396.32
12 Batu Kali M3 374,426.53 374,743.67 374,743.67 375,281.62 375,281.62 375,540.48 375,540.48
13 Chipping M3 223,254.32 223,443.42 223,443.42 223,764.18 223,764.18 223,918.52 223,918.52
14 Chipping (kg) Kg 288.33 318.63 288.57 319.09 288.99 319.31 289.19
15 Filler Cement Kg 2,002.28 2,003.98 2,003.98 2,006.85 2,006.85 2,008.24 2,008.24
16 Gebalan Rumput M' 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 400,456.18 400,795.37 400,795.37 401,370.72 401,370.72 401,647.57 401,647.57
18 Kapur M3 100,114.05 100,198.84 100,198.84 100,342.68 100,342.68 100,411.89 100,411.89
19 Pasir Beton (Kasar) M3 475,541.72 475,944.51 475,944.51 476,627.73 476,627.73 476,956.49 476,956.49
20 Pasir Halus (untuk HRS) M3 300,342.14 300,596.53 300,596.53 301,028.04 301,028.04 301,235.68 301,235.68
21 Pasir Pasang (Sedang) M3 266,303.36 266,528.92 266,528.92 266,911.53 266,911.53 267,095.63 267,095.63
22 Pasir Urug M3 204,232.65 204,405.64 204,405.64 204,699.07 204,699.07 204,840.26 204,840.26
23 Pasir Urug (ada unsur lempung) M3 160,182.47 160,318.15 160,318.15 160,548.29 160,548.29 160,659.03 160,659.03
24 Sirtu M3 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32
26 Anti Pengelupas Liter 101,115.19 101,200.83 101,200.83 101,346.11 101,346.11 101,416.01 101,416.01
27 Arbocell Kg 142,161.94 142,282.36 142,282.36 142,486.61 142,486.61 142,584.89 142,584.89
28 Asbuton Curah Kg 15,017.11 15,029.83 15,029.83 15,051.40 15,051.40 15,061.78 15,061.78
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31
30 Aspal Emulsi (CSS-1) Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
HARGA SATUAN DASAR BAHAN KABUPATEN SUMENEP TA. 2019 / 2020
Min Max
BAHAN BAKU
1 Agregat Pecah Mesin 0-5 mm M3 315,815.28 605,307.32
2 Agregat Pecah Mesin 20-30 mm M3 300,776.45 576,483.16
3 Agregat Pecah Mesin 5-10 & 10-20 mm M3 344,890.33 661,034.03
4 Bahan Agr. Base Kelas A M3 330,854.10 634,131.48
5 Bahan Agr. Base Kelas B M3 310,802.33 595,699.27
6 Bahan Agr. Base Kelas C M3 285,737.63 547,659.00
7 Bahan Agr. Base Kelas C2 M3 260,672.93 499,618.74
8 Bahan Agr. Base Kelas S M3 211,546.11 405,459.82
9 Bahan Pilihan M3 210,543.52 403,538.21
10 Bahan Tanah Timbunan M3 120,310.58 230,593.26
11 Batu Belah/Kerakal M3 339,877.39 651,425.97
12 Batu Kali M3 374,967.98 718,682.34
13 Chipping M3 223,577.16 428,519.15
14 Chipping (kg) Kg 318.82 580.99
15 Filler Cement Kg 2,005.18 3,843.22
16 Gebalan Rumput M' 7,018.12 13,451.27
17 Gravel (Kerikil > 2/3 untuk Drainase) M3 401,035.27 768,644.22
18 Kapur M3 100,258.82 192,161.05
19 Pasir Beton (Kasar) M3 476,229.38 912,765.01
20 Pasir Halus (untuk HRS) M3 300,776.45 576,483.16
21 Pasir Pasang (Sedang) M3 266,688.45 511,148.40
22 Pasir Urug M3 204,527.99 392,008.55
23 Pasir Urug (ada unsur lempung) M3 160,414.11 307,457.69
24 Sirtu M3 205,530.58 393,930.16
BAHAN OLAHAN
25 Additive (Additive Cement CMB) Liter 70,181.17 134,512.74
26 Anti Pengelupas Liter 101,261.41 194,082.66
27 Arbocell Kg 142,367.52 272,868.70
28 Asbuton Curah Kg 15,038.82 28,824.16
29 Aspal Emulsi (CRS-1/53 R-65) Kg 11,028.47 21,137.72
30 Aspal Emulsi (CSS-1) Kg 10,025.88 19,216.11
31 Aspal Minyak (Drum) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
32 Aspal Modifikasi (BNA) Kg 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83
33 Aspal Modifikasi (JAP-57) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25
34 Aspal Modifikasi (Retona) Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
35 Aspal Modifikasi (Starbit) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25
36 Aspal Minyak (Curah) Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
37 Assetilline Botol 156,649.76 156,649.76 156,491.44 156,491.44 156,263.80 156,263.80 156,177.91
38 Bahan Pengawet: Kreosot Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55
39 Bensin Liter 11,045.82 11,045.82 11,034.65 11,034.65 11,018.60 11,018.60 11,012.55
40 Beton B-0 M3 592,942.61 592,942.61 592,343.35 592,343.35 591,481.68 591,481.68 591,156.58
41 Beton K-125 (fc' 10 MPa) M3 613,042.36 613,042.36 612,422.79 612,422.79 611,531.91 611,531.91 611,195.79
42 Beton K-175 (fc' 15 MPa) M3 663,291.74 663,291.74 662,621.37 662,621.37 661,657.48 661,657.48 661,293.80
43 Beton K-250 (fc' 20 MPa) M3 738,665.80 738,665.80 737,919.26 737,919.26 736,845.82 736,845.82 736,440.83
44 Beton K-300 (fc' 25 MPa) M3 768,815.42 768,815.42 768,038.41 768,038.41 766,921.16 766,921.16 766,499.63
45 Beton K-350 (fc' 30 MPa) M3 798,965.05 798,965.05 798,157.57 798,157.57 796,996.50 796,996.50 796,558.44
46 Beton K-400 (fc' 35 MPa) M3 829,114.67 829,114.67 828,276.72 828,276.72 827,071.84 827,071.84 826,617.25
47 Beton K-450 (fc' 40 MPa) M3 869,314.17 869,314.17 868,435.59 868,435.59 867,172.30 867,172.30 866,695.67
48 Beton K-500 (fc' 45 MPa) M3 904,488.73 904,488.73 903,574.60 903,574.60 902,260.19 902,260.19 901,764.28
49 Bunker Oil Liter 4,016.66 4,016.66 4,012.60 4,012.60 4,006.76 4,006.76 4,004.56
50 Cat Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13
51 Cat Anti Karat Kg 73,304.06 73,304.06 73,229.97 73,229.97 73,123.44 73,123.44 73,083.25
52 Cat Marka (Non Thermoplas) Kg 65,270.73 65,270.73 65,204.77 65,204.77 65,109.92 65,109.92 65,074.13
53 Cat Marka (Thermoplastic) Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32
54 Cerucuk Diameter 10-15 cm M' 25,104.13 25,104.13 25,078.76 25,078.76 25,042.28 25,042.28 25,028.51
55 Cold Mix (Aspal Dingin) Kg 8,033.32 8,033.32 8,025.20 8,025.20 8,013.53 8,013.53 8,009.12
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,311,439.69 1,311,439.69 1,310,114.27 1,310,114.27 1,308,208.48 1,308,208.48 1,307,489.44
57 Curing Compound Liter 50,208.26 50,208.26 50,157.51 50,157.51 50,084.55 50,084.55 50,057.02
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 612,540.74 612,540.74 611,921.67 611,921.67 611,031.53 611,031.53 610,695.68
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 713,961.42 713,961.42 713,239.85 713,239.85 712,202.32 712,202.32 711,810.86
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 904,752.80 904,752.80 903,838.41 903,838.41 902,523.61 902,523.61 902,027.55
61 Kerosen/Minyak Tanah Liter 14,058.31 14,058.31 14,044.10 14,044.10 14,023.67 14,023.67 14,015.97
62 Minyak Fluks Liter 7,029.16 7,029.16 7,022.05 7,022.05 7,011.84 7,011.84 7,007.98
63 Minyak Pelumas/Olie Liter 48,199.93 48,199.93 48,151.21 48,151.21 48,081.17 48,081.17 48,054.74
64 Oxygen (Isi 6 M3) Botol 172,716.41 172,716.41 172,541.85 172,541.85 172,290.86 172,290.86 172,196.16
65 Polytene 125 Mikron Kg 27,112.46 27,112.46 27,085.06 27,085.06 27,045.66 27,045.66 27,030.79
66 Sand Sheet Ton 1,386,752.07 1,386,752.07 1,385,350.54 1,385,350.54 1,383,335.31 1,383,335.31 1,382,574.97
67 Seal Coat M2 110,458.17 110,458.17 110,346.53 110,346.53 110,186.01 110,186.01 110,125.45
31 Aspal Minyak (Drum) Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
32 Aspal Modifikasi (BNA) Kg 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55
33 Aspal Modifikasi (JAP-57) Kg 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90
34 Aspal Modifikasi (Retona) Kg 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
35 Aspal Modifikasi (Starbit) Kg 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90
36 Aspal Minyak (Curah) Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
37 Assetilline Botol 156,177.91 156,310.20 156,310.20 156,534.58 156,534.58 156,642.55 156,642.55
38 Bahan Pengawet: Kreosot Liter 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31
39 Bensin Liter 11,012.55 11,021.87 11,021.87 11,037.69 11,037.69 11,045.31 11,045.31
40 Beton B-0 M3 591,156.58 591,657.30 591,657.30 592,506.63 592,506.63 592,915.32 592,915.32
41 Beton K-125 (fc' 10 MPa) M3 611,195.79 611,713.48 611,713.48 612,591.60 612,591.60 613,014.14 613,014.14
42 Beton K-175 (fc' 15 MPa) M3 661,293.80 661,853.93 661,853.93 662,804.03 662,804.03 663,261.20 663,261.20
43 Beton K-250 (fc' 20 MPa) M3 736,440.83 737,064.60 737,064.60 738,122.67 738,122.67 738,631.79 738,631.79
44 Beton K-300 (fc' 25 MPa) M3 766,499.63 767,148.87 767,148.87 768,250.12 768,250.12 768,780.03 768,780.03
45 Beton K-350 (fc' 30 MPa) M3 796,558.44 797,233.14 797,233.14 798,377.58 798,377.58 798,928.27 798,928.27
46 Beton K-400 (fc' 35 MPa) M3 826,617.25 827,317.41 827,317.41 828,505.03 828,505.03 829,076.50 829,076.50
47 Beton K-450 (fc' 40 MPa) M3 866,695.67 867,429.77 867,429.77 868,674.97 868,674.97 869,274.15 869,274.15
48 Beton K-500 (fc' 45 MPa) M3 901,764.28 902,528.08 902,528.08 903,823.67 903,823.67 904,447.10 904,447.10
49 Bunker Oil Liter 4,004.56 4,007.95 4,007.95 4,013.71 4,013.71 4,016.48 4,016.48
50 Cat Kg 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73
51 Cat Anti Karat Kg 73,083.25 73,145.16 73,145.16 73,250.16 73,250.16 73,300.68 73,300.68
52 Cat Marka (Non Thermoplas) Kg 65,074.13 65,129.25 65,129.25 65,222.74 65,222.74 65,267.73 65,267.73
53 Cat Marka (Thermoplastic) Kg 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35
54 Cerucuk Diameter 10-15 cm M' 25,028.51 25,049.71 25,049.71 25,085.67 25,085.67 25,102.97 25,102.97
55 Cold Mix (Aspal Dingin) Kg 8,009.12 8,015.91 8,015.91 8,027.41 8,027.41 8,032.95 8,032.95
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,307,489.44 1,308,596.90 1,308,596.90 1,310,475.40 1,310,475.40 1,311,379.32 1,311,379.32
57 Curing Compound Liter 50,057.02 50,099.42 50,099.42 50,171.34 50,171.34 50,205.95 50,205.95
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 610,695.68 611,212.95 611,212.95 612,090.35 612,090.35 612,512.55 612,512.55
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 711,810.86 712,413.78 712,413.78 713,436.46 713,436.46 713,928.56 713,928.56
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 902,027.55 902,791.58 902,791.58 904,087.55 904,087.55 904,711.15 904,711.15
61 Kerosen/Minyak Tanah Liter 14,015.97 14,027.84 14,027.84 14,047.98 14,047.98 14,057.66 14,057.66
62 Minyak Fluks Liter 7,007.98 7,013.92 7,013.92 7,023.99 7,023.99 7,028.83 7,028.83
63 Minyak Pelumas/Olie Liter 48,054.74 48,095.44 48,095.44 48,164.49 48,164.49 48,197.71 48,197.71
64 Oxygen (Isi 6 M3) Botol 172,196.16 172,342.01 172,342.01 172,589.41 172,589.41 172,708.46 172,708.46
65 Polytene 125 Mikron Kg 27,030.79 27,053.69 27,053.69 27,092.52 27,092.52 27,111.21 27,111.21
66 Sand Sheet Ton 1,382,574.97 1,383,746.03 1,383,746.03 1,385,732.41 1,385,732.41 1,386,688.24 1,386,688.24
67 Seal Coat M2 110,125.45 110,218.73 110,218.73 110,376.95 110,376.95 110,453.08 110,453.08
31 Aspal Minyak (Drum) Kg 10,025.88 19,216.11
32 Aspal Modifikasi (BNA) Kg 13,033.65 24,980.94
33 Aspal Modifikasi (JAP-57) Kg 16,041.41 30,745.77
34 Aspal Modifikasi (Retona) Kg 12,031.06 23,059.33
35 Aspal Modifikasi (Starbit) Kg 16,041.41 30,745.77
36 Aspal Minyak (Curah) Kg 10,025.88 19,216.11
37 Assetilline Botol 156,403.76 299,771.24
38 Bahan Pengawet: Kreosot Liter 11,028.47 21,137.72
39 Bensin Liter 11,028.47 21,137.72
40 Beton B-0 M3 592,011.44 1,134,678.67
41 Beton K-125 (fc' 10 MPa) M3 612,079.62 1,173,142.35
42 Beton K-175 (fc' 15 MPa) M3 662,250.08 1,269,301.56
43 Beton K-250 (fc' 20 MPa) M3 737,505.77 1,413,540.37
44 Beton K-300 (fc' 25 MPa) M3 767,608.05 1,471,235.90
45 Beton K-350 (fc' 30 MPa) M3 797,710.32 1,528,931.42
46 Beton K-400 (fc' 35 MPa) M3 827,812.60 1,586,626.95
47 Beton K-450 (fc' 40 MPa) M3 867,948.97 1,663,554.32
48 Beton K-500 (fc' 45 MPa) M3 903,068.29 1,730,865.76
49 Bunker Oil Liter 4,010.35 7,686.44
50 Cat Kg 65,168.23 124,904.69
51 Cat Anti Karat Kg 73,188.94 140,277.57
52 Cat Marka (Non Thermoplas) Kg 65,168.23 124,904.69
53 Cat Marka (Thermoplastic) Kg 45,116.47 86,472.47
54 Cerucuk Diameter 10-15 cm M' 25,064.70 48,040.26
55 Cold Mix (Aspal Dingin) Kg 8,020.71 15,372.88
56 CPHMA (Cold Paving Hotmix Asbuton) M2 1,309,380.16 2,509,623.37
57 Curing Compound Liter 50,129.41 96,080.53
58 Elastomer Jenis 1 (35×30×3,6 cm) Buah 611,578.79 1,172,182.43
59 Elastomer Jenis 2 (40×35×3,9 cm) Buah 712,840.19 1,366,265.09
60 Elastomer Jenis 3 (45×40×4,5 cm) Buah 903,331.95 1,731,371.10
61 Kerosen/Minyak Tanah Liter 14,036.23 26,902.55
62 Minyak Fluks Liter 7,018.12 13,451.27
63 Minyak Pelumas/Olie Liter 48,124.23 92,237.31
64 Oxygen (Isi 6 M3) Botol 172,445.17 330,517.01
65 Polytene 125 Mikron Kg 27,069.88 51,883.48
66 Sand Sheet Ton 1,384,574.27 2,653,744.16
67 Seal Coat M2 110,284.70 211,377.16
68 Seal Guard Kg 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06
69 Semen/PC (50 kg) Zak 69,287.40 69,287.40 69,217.37 69,217.37 69,116.68 69,116.68 69,078.69
70 Semen/PC (kg) Kg 1,004.17 1,004.17 1,003.15 1,003.15 1,001.69 1,001.69 1,001.14
71 Slurry Seal Ton 40,166.61 40,166.61 40,126.01 40,126.01 40,067.64 40,067.64 40,045.62
72 Solar Liter 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
73 Thinner Liter 35,145.78 35,145.78 35,110.26 35,110.26 35,059.19 35,059.19 35,039.92
68 Seal Guard Kg 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28
69 Semen/PC (50 kg) Zak 69,078.69 69,137.20 69,137.20 69,236.45 69,236.45 69,284.21 69,284.21
70 Semen/PC (kg) Kg 1,001.14 1,001.99 1,001.99 1,003.43 1,003.43 1,004.12 1,004.12
71 Slurry Seal Ton 40,045.62 40,079.54 40,079.54 40,137.07 40,137.07 40,164.76 40,164.76
72 Solar Liter 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
73 Thinner Liter 35,039.92 35,069.60 35,069.60 35,119.94 35,119.94 35,144.16 35,144.16
68 Seal Guard Kg 36,093.17 69,177.98
69 Semen/PC (50 kg) Zak 69,178.58 132,591.13
70 Semen/PC (kg) Kg 1,002.59 1,921.61
71 Slurry Seal Ton 40,103.53 76,864.42
72 Solar Liter 12,031.06 23,059.33
73 Thinner Liter 35,090.59 67,256.37
Harga Satuan Dasar
Jun-20 Jul-20 Aug-20 Sep-20
No Jenis Bahan Satuan
1.0041651508 1.0031502833 1.0016910247 1.001140456
Min Max Min Max Min Max Min
BAHAN JADI
74 Baja Bergelombang Kg 17,070.81 17,070.81 17,053.55 17,053.55 17,028.75 17,028.75 17,019.39
75 Baja Prategang Kg 20,083.30 20,083.30 20,063.01 20,063.01 20,033.82 20,033.82 20,022.81
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,066.64 16,066.64 16,050.40 16,050.40 16,027.06 16,027.06 16,018.25
77 Baja Tulangan (Polos) U25 Kg 12,049.98 10,041.65 12,037.80 10,031.50 12,020.29 10,016.91 12,013.69
78 Baja Tulangan (Polos) U32 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
79 Baja Tulangan (Polos) U36 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
80 Baja Tulangan (Ulir) D16 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
81 Baja Tulangan (Ulir) D19 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
82 Baja Tulangan (Ulir) D24 Kg 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
83 Baja Tulangan (Ulir) D32 Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
84 Baja Tulangan (Ulir) D36 Kg 11,045.82 12,049.98 11,034.65 12,037.80 11,018.60 12,020.29 11,012.55
85 Besi Beton Kg 12,049.98 12,049.98 12,037.80 12,037.80 12,020.29 12,020.29 12,013.69
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,065,192.78 13,065,192.78 13,051,988.34 13,051,988.34 13,033,001.92 13,033,001.92 13,025,838.48
87 Box Culvert Type DUB 200×200 M' 13,868,524.90 13,868,524.90 13,854,508.56 13,854,508.56 13,834,354.74 13,834,354.74 13,826,750.84
88 Box Culvert Type uk 300×200 M' 14,974,110.73 14,974,110.73 14,958,977.02 14,958,977.02 14,937,216.56 14,937,216.56 14,929,006.48
89 Casing M2 13,054.15 13,054.15 13,040.95 13,040.95 13,021.98 13,021.98 13,014.83
90 Ducting (Kabel Prestress) M' 194,808.04 194,808.04 194,611.15 194,611.15 194,328.06 194,328.06 194,221.25
91 Ducting (Strand Prestress) M' 169,703.91 169,703.91 169,532.40 169,532.40 169,285.78 169,285.78 169,192.74
92 Expansion Cap M2 10,041.65 10,041.65 10,031.50 10,031.50 10,016.91 10,016.91 10,011.40
93 Expansion Join Baja Siku M' 2,187,071.70 2,187,071.70 2,184,861.32 2,184,861.32 2,181,683.05 2,181,683.05 2,180,483.91
94 Expansion Join Tipe Rubber M' 1,583,568.44 1,583,568.44 1,581,968.00 1,581,968.00 1,579,666.75 1,579,666.75 1,578,798.50
95 Expansion Join Tipe Torma M' 1,815,530.59 1,815,530.59 1,813,695.71 1,813,695.71 1,811,057.37 1,811,057.37 1,810,061.94
96 Expansion Tipe Joint Asphaltic Plug M' 2,153,934.25 2,153,934.25 2,151,757.36 2,151,757.36 2,148,627.25 2,148,627.25 2,147,446.28
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,174.94 42,174.94 42,132.31 42,132.31 42,071.02 42,071.02 42,047.90
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49
99 Glass Bead Kg 70,291.56 70,291.56 70,220.52 70,220.52 70,118.37 70,118.37 70,079.83
100 Joint Sealent Kg 45,187.43 45,187.43 45,141.76 45,141.76 45,076.10 45,076.10 45,051.32
101 Joint Socket Pile 16×16×16 Set 91,379.03 91,379.03 91,286.68 91,286.68 91,153.88 91,153.88 91,103.78
102 Joint Socket Pile 35×35 Set 786,261.31 786,261.31 785,466.67 785,466.67 784,324.07 784,324.07 783,892.98
103 Kawat Beton Kg 22,091.63 22,091.63 22,069.31 22,069.31 22,037.20 22,037.20 22,025.09
104 Kawat Bronjong Kg 34,141.62 34,141.62 34,107.11 34,107.11 34,057.49 34,057.49 34,038.78
105 Kawat Las Dos 138,574.79 138,574.79 138,434.74 138,434.74 138,233.36 138,233.36 138,157.38
Harga Satuan Dasar per Bulan
Sep-20 Oct-20 Nov-20 Dec-20
No Jenis Bahan Satuan
1.0011404562 1.0019884346 1.0034268027 1.0041189267
Max Min Max Min Max Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,019.39 17,033.80 17,033.80 17,058.26 17,058.26 17,070.02 17,070.02
75 Baja Prategang Kg 20,022.81 20,039.77 20,039.77 20,068.54 20,068.54 20,082.38 20,082.38
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,018.25 16,031.81 16,031.81 16,054.83 16,054.83 16,065.90 16,065.90
77 Baja Tulangan (Polos) U25 Kg 10,011.40 12,023.86 10,019.88 12,041.12 10,034.27 12,049.43 10,041.19
78 Baja Tulangan (Polos) U32 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
79 Baja Tulangan (Polos) U36 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
80 Baja Tulangan (Ulir) D16 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
81 Baja Tulangan (Ulir) D19 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
82 Baja Tulangan (Ulir) D24 Kg 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
83 Baja Tulangan (Ulir) D32 Kg 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
84 Baja Tulangan (Ulir) D36 Kg 12,013.69 11,021.87 12,023.86 11,037.69 12,041.12 11,045.31 12,049.43
85 Besi Beton Kg 12,013.69 12,023.86 12,023.86 12,041.12 12,041.12 12,049.43 12,049.43
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,025,838.48 13,036,871.52 13,036,871.52 13,055,586.13 13,055,586.13 13,064,591.36 13,064,591.36
87 Box Culvert Type DUB 200×200 M' 13,826,750.84 13,838,462.27 13,838,462.27 13,858,327.57 13,858,327.57 13,867,886.50 13,867,886.50
88 Box Culvert Type uk 300×200 M' 14,929,006.48 14,941,651.54 14,941,651.54 14,963,100.48 14,963,100.48 14,973,421.43 14,973,421.43
89 Casing M2 13,014.83 13,025.85 13,025.85 13,044.55 13,044.55 13,053.55 13,053.55
90 Ducting (Kabel Prestress) M' 194,221.25 194,385.76 194,385.76 194,664.80 194,664.80 194,799.07 194,799.07
91 Ducting (Strand Prestress) M' 169,192.74 169,336.05 169,336.05 169,579.13 169,579.13 169,696.10 169,696.10
92 Expansion Cap M2 10,011.40 10,019.88 10,019.88 10,034.27 10,034.27 10,041.19 10,041.19
93 Expansion Join Baja Siku M' 2,180,483.91 2,182,330.81 2,182,330.81 2,185,463.58 2,185,463.58 2,186,971.02 2,186,971.02
94 Expansion Join Tipe Rubber M' 1,578,798.50 1,580,135.76 1,580,135.76 1,582,404.07 1,582,404.07 1,583,495.55 1,583,495.55
95 Expansion Join Tipe Torma M' 1,810,061.94 1,811,595.09 1,811,595.09 1,814,195.66 1,814,195.66 1,815,447.02 1,815,447.02
96 Expansion Tipe Joint Asphaltic Plug M' 2,147,446.28 2,149,265.19 2,149,265.19 2,152,350.49 2,152,350.49 2,153,835.10 2,153,835.10
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,047.90 42,083.51 42,083.51 42,143.93 42,143.93 42,172.99 42,172.99
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81
99 Glass Bead Kg 70,079.83 70,139.19 70,139.19 70,239.88 70,239.88 70,288.32 70,288.32
100 Joint Sealent Kg 45,051.32 45,089.48 45,089.48 45,154.21 45,154.21 45,185.35 45,185.35
101 Joint Socket Pile 16×16×16 Set 91,103.78 91,180.95 91,180.95 91,311.84 91,311.84 91,374.82 91,374.82
102 Joint Socket Pile 35×35 Set 783,892.98 784,556.94 784,556.94 785,683.19 785,683.19 786,225.12 786,225.12
103 Kawat Beton Kg 22,025.09 22,043.75 22,043.75 22,075.39 22,075.39 22,090.62 22,090.62
104 Kawat Bronjong Kg 34,038.78 34,067.61 34,067.61 34,116.51 34,116.51 34,140.04 34,140.04
105 Kawat Las Dos 138,157.38 138,274.40 138,274.40 138,472.90 138,472.90 138,568.41 138,568.41
Rata2 Harga Satuan Dasar 2020
No Jenis Bahan Satuan
Min Max
BAHAN JADI
74 Baja Bergelombang Kg 17,044.00 32,667.38
75 Baja Prategang Kg 20,051.76 38,432.21
76 Baja Struktur Galvanis (H Beam 400×400×13×2 mm - 12 M) Kg 16,041.41 30,745.77
77 Baja Tulangan (Polos) U25 Kg 12,031.06 21,054.15
78 Baja Tulangan (Polos) U32 Kg 10,025.88 19,216.11
79 Baja Tulangan (Polos) U36 Kg 10,025.88 19,216.11
80 Baja Tulangan (Ulir) D16 Kg 10,025.88 19,216.11
81 Baja Tulangan (Ulir) D19 Kg 10,025.88 19,216.11
82 Baja Tulangan (Ulir) D24 Kg 10,025.88 19,216.11
83 Baja Tulangan (Ulir) D32 Kg 12,031.06 23,059.33
84 Baja Tulangan (Ulir) D36 Kg 11,028.47 22,140.30
85 Besi Beton Kg 12,031.06 23,059.33
86 Box Culvert (Gorong-gorong Persegi) Precast 1500×1500 cm M' 13,044,674.76 25,002,074.75
87 Box Culvert Type DUB 200×200 M' 13,846,745.31 26,539,363.19
88 Box Culvert Type uk 300×200 M' 14,950,594.89 28,655,056.39
89 Casing M2 13,033.65 24,980.94
90 Ducting (Kabel Prestress) M' 194,502.11 372,792.45
91 Ducting (Strand Prestress) M' 169,437.40 324,752.18
92 Expansion Cap M2 10,025.88 19,216.11
93 Expansion Join Baja Siku M' 2,183,637.05 4,185,267.76
94 Expansion Join Tipe Rubber M' 1,581,081.55 3,030,379.82
95 Expansion Join Tipe Torma M' 1,812,679.42 3,474,271.86
96 Expansion Tipe Joint Asphaltic Plug M' 2,150,551.64 4,121,854.61
97 Geotextile Non Woven (4m×50m×0,4mm) 26 kN/m M3 42,108.70 80,707.64
98 Geotextile Woven (4m×150m×0,7mm) 53/52 kN/m M2 32,082.82 61,491.54
99 Glass Bead Kg 70,181.17 134,512.74
100 Joint Sealent Kg 45,116.47 86,472.47
101 Joint Socket Pile 16×16×16 Set 91,235.52 174,866.56
102 Joint Socket Pile 35×35 Set 785,026.54 1,504,621.05
103 Kawat Beton Kg 22,056.94 42,275.43
104 Kawat Bronjong Kg 34,088.00 65,334.76
105 Kawat Las Dos 138,357.17 265,182.25
106 Kayu Acuan (Kelas III/Meranti) M3 4,321,926.81 4,321,926.81 4,317,558.82 4,317,558.82 4,311,278.17 4,311,278.17 4,308,908.52
107 Kayu Perancah (Gelam) M3 2,783,545.80 2,783,545.80 2,780,732.59 2,780,732.59 2,776,687.52 2,776,687.52 2,775,161.34
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,229.08 55,229.08 55,173.27 55,173.27 55,093.01 55,093.01 55,062.73
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34
110 Marmer Nama Jembatan Buah 602,499.09 602,499.09 601,890.17 601,890.17 601,014.61 601,014.61 600,684.27
111 Mata Kucing Buah 158,658.09 158,658.09 158,497.74 158,497.74 158,267.18 158,267.18 158,180.19
112 Matras Concrete (Tebal=10 cm) M2 147,612.28 147,612.28 147,463.09 147,463.09 147,248.58 147,248.58 147,167.65
113 Mini Pile 16×16×16 M' 136,566.46 136,566.46 136,428.44 136,428.44 136,229.98 136,229.98 136,155.10
114 Mini Timber Pile Buah 32,133.28 32,133.28 32,100.81 32,100.81 32,054.11 32,054.11 32,036.49
115 Multipleks 12 mm Lbr 286,187.07 286,187.07 285,897.83 285,897.83 285,481.94 285,481.94 285,325.03
116 Paku Kg 18,074.97 18,074.97 18,056.71 18,056.71 18,030.44 18,030.44 18,020.53
117 Paving Block (Model Bata 8 cm) M2 95,395.69 95,395.69 95,299.28 95,299.28 95,160.65 95,160.65 95,108.34
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,810,119.98 66,810,119.98 66,742,597.80 66,742,597.80 66,645,508.95 66,645,508.95 66,608,877.97
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,647,586.29 94,647,586.29 94,551,929.95 94,551,929.95 94,414,387.54 94,414,387.54 94,362,493.70
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,897,339.42 180,897,339.42 180,714,514.08 180,714,514.08 180,451,633.03 180,451,633.03 180,352,449.77
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 237,218,954.40 237,218,954.40 236,979,207.17 236,979,207.17 236,634,479.23 236,634,479.23 236,504,415.67
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 302,391,281.02 302,391,281.02 302,085,666.86 302,085,666.86 301,646,230.11 301,646,230.11 301,480,433.56
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,834,286.75 364,834,286.75 364,465,564.07 364,465,564.07 363,935,384.79 363,935,384.79 363,735,351.69
124 Pelat Rambu (Eng. Grade) Buah 210,874.68 210,874.68 210,661.56 210,661.56 210,355.12 210,355.12 210,239.50
125 Pelat Rambu (High L Grade) Buah 246,020.46 246,020.46 245,771.82 245,771.82 245,414.30 245,414.30 245,279.41
126 Pemantul Cahaya (Reflector) Buah 15,074.53 15,074.53 15,059.29 15,059.29 15,037.39 15,037.39 15,029.12
127 Pipa Baja D10" Kg 23,095.80 23,095.80 23,072.46 23,072.46 23,038.89 23,038.89 23,026.23
128 Pipa Drainase Baja Dia 3" M' 276,145.42 276,145.42 275,866.33 275,866.33 275,465.03 275,465.03 275,313.63
129 Pipa Galvanis Dia 1,5" M' 180,749.73 180,749.73 180,567.05 180,567.05 180,304.38 180,304.38 180,205.28
130 Pipa Galvanis Dia 2" M' 205,853.86 205,853.86 205,645.81 205,645.81 205,346.66 205,346.66 205,233.79
131 Pipa Galvanis Dia 3" M' 242,201.62 242,201.62 241,956.84 241,956.84 241,604.87 241,604.87 241,472.07
132 Pipa Porus M' 45,224.59 45,224.59 45,178.88 45,178.88 45,113.16 45,113.16 45,088.36
133 Pipa PVC Dia 4" M' 209,870.52 209,870.52 209,658.41 209,658.41 209,353.42 209,353.42 209,238.36
134 Plastik Filter M2 36,149.95 36,149.95 36,113.41 36,113.41 36,060.88 36,060.88 36,041.06
135 Rel Pengaman M' 170,708.08 170,708.08 170,535.55 170,535.55 170,287.47 170,287.47 170,193.88
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,064,563.55 2,064,563.55 2,062,476.98 2,062,476.98 2,059,476.75 2,059,476.75 2,058,344.78
137 Strip Bearing Buah 316,312.02 316,312.02 315,992.34 315,992.34 315,532.67 315,532.67 315,359.24
138 Tiang Pancang Baja Diameter 400 M' 731,032.23 731,032.23 730,293.41 730,293.41 729,231.07 729,231.07 728,830.25
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 893,706.98 893,706.98 892,803.75 892,803.75 891,505.01 891,505.01 891,015.01
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,869,755.51 1,869,755.51 1,867,865.83 1,867,865.83 1,865,148.69 1,865,148.69 1,864,123.53
106 Kayu Acuan (Kelas III/Meranti) M3 4,308,908.52 4,312,558.22 4,312,558.22 4,318,748.96 4,318,748.96 4,321,727.86 4,321,727.86
107 Kayu Perancah (Gelam) M3 2,775,161.34 2,777,511.94 2,777,511.94 2,781,499.10 2,781,499.10 2,783,417.66 2,783,417.66
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,062.73 55,109.36 55,109.36 55,188.47 55,188.47 55,226.54 55,226.54
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30
110 Marmer Nama Jembatan Buah 600,684.27 601,193.06 601,193.06 602,056.08 602,056.08 602,471.36 602,471.36
111 Mata Kucing Buah 158,180.19 158,314.17 158,314.17 158,541.43 158,541.43 158,650.79 158,650.79
112 Matras Concrete (Tebal=10 cm) M2 147,167.65 147,292.30 147,292.30 147,503.74 147,503.74 147,605.48 147,605.48
113 Mini Pile 16×16×16 M' 136,155.10 136,270.43 136,270.43 136,466.05 136,466.05 136,560.17 136,560.17
114 Mini Timber Pile Buah 32,036.49 32,063.63 32,063.63 32,109.66 32,109.66 32,131.81 32,131.81
115 Multipleks 12 mm Lbr 285,325.03 285,566.70 285,566.70 285,976.64 285,976.64 286,173.89 286,173.89
116 Paku Kg 18,020.53 18,035.79 18,035.79 18,061.68 18,061.68 18,074.14 18,074.14
117 Paving Block (Model Bata 8 cm) M2 95,108.34 95,188.90 95,188.90 95,325.55 95,325.55 95,391.30 95,391.30
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,608,877.97 66,665,296.52 66,665,296.52 66,760,995.46 66,760,995.46 66,807,044.55 66,807,044.55
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,362,493.70 94,442,419.90 94,442,419.90 94,577,993.29 94,577,993.29 94,643,229.43 94,643,229.43
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,352,449.77 180,505,210.52 180,505,210.52 180,764,328.23 180,764,328.23 180,889,012.28 180,889,012.28
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,504,415.67 236,704,737.84 236,704,737.84 237,044,530.74 237,044,530.74 237,208,034.64 237,208,034.64
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 301,480,433.56 301,735,791.22 301,735,791.22 302,168,937.09 302,168,937.09 302,377,361.22 302,377,361.22
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 363,735,351.69 364,043,440.04 364,043,440.04 364,566,029.39 364,566,029.39 364,817,492.56 364,817,492.56
124 Pelat Rambu (Eng. Grade) Buah 210,239.50 210,417.57 210,417.57 210,719.63 210,719.63 210,864.97 210,864.97
125 Pelat Rambu (High L Grade) Buah 245,279.41 245,487.17 245,487.17 245,839.57 245,839.57 246,009.14 246,009.14
126 Pemantul Cahaya (Reflector) Buah 15,029.12 15,041.85 15,041.85 15,063.44 15,063.44 15,073.83 15,073.83
127 Pipa Baja D10" Kg 23,026.23 23,045.73 23,045.73 23,078.82 23,078.82 23,094.74 23,094.74
128 Pipa Drainase Baja Dia 3" M' 275,313.63 275,546.82 275,546.82 275,942.37 275,942.37 276,132.70 276,132.70
129 Pipa Galvanis Dia 1,5" M' 180,205.28 180,357.92 180,357.92 180,616.82 180,616.82 180,741.41 180,741.41
130 Pipa Galvanis Dia 2" M' 205,233.79 205,407.63 205,407.63 205,702.49 205,702.49 205,844.38 205,844.38
131 Pipa Galvanis Dia 3" M' 241,472.07 241,676.60 241,676.60 242,023.53 242,023.53 242,190.47 242,190.47
132 Pipa Porus M' 45,088.36 45,126.55 45,126.55 45,191.33 45,191.33 45,222.50 45,222.50
133 Pipa PVC Dia 4" M' 209,238.36 209,415.58 209,415.58 209,716.20 209,716.20 209,860.86 209,860.86
134 Plastik Filter M2 36,041.06 36,071.58 36,071.58 36,123.36 36,123.36 36,148.28 36,148.28
135 Rel Pengaman M' 170,193.88 170,338.03 170,338.03 170,582.56 170,582.56 170,700.22 170,700.22
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,058,344.78 2,060,088.22 2,060,088.22 2,063,045.51 2,063,045.51 2,064,468.51 2,064,468.51
137 Strip Bearing Buah 315,359.24 315,626.36 315,626.36 316,079.44 316,079.44 316,297.46 316,297.46
138 Tiang Pancang Baja Diameter 400 M' 728,830.25 729,447.58 729,447.58 730,494.71 730,494.71 730,998.58 730,998.58
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 891,015.01 891,769.71 891,769.71 893,049.85 893,049.85 893,665.84 893,665.84
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,864,123.53 1,865,702.47 1,865,702.47 1,868,380.71 1,868,380.71 1,869,669.44 1,869,669.44
106 Kayu Acuan (Kelas III/Meranti) M3 4,315,139.51 8,270,611.77
107 Kayu Perancah (Gelam) M3 2,779,174.43 5,326,704.42
108 Kerb Pracetak Type 1 (Peninggi) Buah 55,142.35 105,688.58
109 Kerb Pracetak Type 2 (Penghalang/Barrier) Buah 95,245.88 182,553.00
110 Marmer Nama Jembatan Buah 601,552.91 1,152,966.32
111 Mata Kucing Buah 158,408.93 303,614.47
112 Matras Concrete (Tebal=10 cm) M2 147,380.46 282,476.75
113 Mini Pile 16×16×16 M' 136,351.99 261,339.03
114 Mini Timber Pile Buah 32,082.82 61,491.54
115 Multipleks 12 mm Lbr 285,737.63 547,659.00
116 Paku Kg 18,046.59 34,588.99
117 Paving Block (Model Bata 8 cm) M2 95,245.88 182,553.00
118 PCI Girder L=16 m, H=0,90 m (K500) Buah 66,705,199.14 127,850,514.15
119 PCI Girder L=20 m, H=1,25 m (K500) Buah 94,498,948.57 181,121,401.58
120 PCI Girder L=25 m, H=1,60 m (K500) Buah 180,613,252.22 346,172,374.19
121 PCI Girder L=30 m, H=1,70 m (K500) Buah 236,846,417.87 453,951,666.24
122 PCI Girder L=35 m, H=2,10 m (K500) Buah 301,916,395.69 578,668,033.59
123 PCI Girder L=40 m, H=2,10 m (K500) Buah 364,261,338.86 698,161,463.49
124 Pelat Rambu (Eng. Grade) Buah 210,543.52 403,538.21
125 Pelat Rambu (High L Grade) Buah 245,634.10 470,794.58
126 Pemantul Cahaya (Reflector) Buah 15,050.85 28,847.22
127 Pipa Baja D10" Kg 23,059.53 44,197.04
128 Pipa Drainase Baja Dia 3" M' 275,711.75 528,442.90
129 Pipa Galvanis Dia 1,5" M' 180,465.87 345,889.90
130 Pipa Galvanis Dia 2" M' 205,530.58 393,930.16
131 Pipa Galvanis Dia 3" M' 241,821.26 463,486.70
132 Pipa Porus M' 45,153.56 86,543.57
133 Pipa PVC Dia 4" M' 209,540.93 401,616.60
134 Plastik Filter M2 36,093.17 69,177.98
135 Rel Pengaman M' 170,439.99 326,673.79
136 Saluran U Tipe DS 1 (80×80×120) Buah 2,061,321.29 3,950,831.27
137 Strip Bearing Buah 315,815.28 605,307.32
138 Tiang Pancang Baja Diameter 400 M' 729,884.19 1,398,932.47
139 Tiang Pancang Beton Ø 400 (K600 Kelas A2) M' 892,303.48 1,710,233.38
140 U-qutter Tipe DS 2 uk 80×100 Buah 1,866,819.18 3,578,038.83