Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.000 36.000 6.313 227.27
2 32 3 1 3 12.000 36.000 6.313 227.27
3 32 3 1 3 5.500 16.500 6.313 104.16
4 32 2 1 2 9.500 19.000 6.313 119.95
5 32 2 1 2 12.000 24.000 6.313 151.51
6 32 2 1 2 8.000 16.000 6.313 101.01
7 32 3 1 3 6.000 18.000 6.313 113.63
8 32 3 1 3 12.000 36.000 6.313 227.27
9 32 3 1 3 9.400 28.200 6.313 178.03
10 32 2 1 2 3.400 6.800 6.313 42.93
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 12.000 24.000 6.313 151.51
13 32 3 1 3 10.910 32.730 6.313 206.62
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 2 1 2 6.160 12.320 6.313 77.78
16 32 2 1 2 12.000 24.000 6.313 151.51
17 32 2 1 2 6.000 12.000 6.313 75.76
18 32 3 1 3 12.000 36.000 6.313 227.27
19 32 3 2 6 7.110 42.660 6.313 269.31
20 32 2 1 2 7.110 14.220 6.313 89.77
21 32 2 1 2 12.000 24.000 6.313 151.51
22 32 3 1 3 12.000 36.000 6.313 227.27
23 32 3 1 3 2.010 6.030 6.313 38.07
24 32 2 1 2 2.010 4.020 6.313 25.38
25 32 2 1 2 12.000 24.000 6.313 151.51
27 a 10 5 2 10 12.000 120.000 0.617 74.04
27 b 10 5 2 10 12.000 120.000 0.617 74.04
27 c 10 5 2 10 3.070 30.700 0.617 18.94
28 a 10 11 1 11 12.010 132.110 0.617 81.51
28 b 10 11 1 11 12.000 132.000 0.617 81.44
28 c 10 11 1 11 2.800 30.800 0.617 19.00
29 a 32 6 1 6 12.000 72.000 6.313 454.54
29 b 32 3 1 3 4.440 13.320 6.313 84.09
30 10 148 1 148 4.050 599.400 0.617 369.83
31 10 148 1 148 3.420 506.160 0.617 312.30
32 10 148 1 148 1.920 284.160 0.617 175.33
33 10 148 1 148 3.450 510.600 0.617 315.04
34 10 148 1 148 1.060 156.880 0.617 96.79
35 10 148 1 148 1.100 162.800 0.617 100.45
36 10 148 4 592 0.540 319.680 0.617 197.24
37 32 44 1 44 0.540 23.760 6.313 150.00
38 32 27 1 27 0.540 14.580 6.313 92.04
39 16 8 2 16 2.030 32.480 1.578 51.25
40 12 4 4 16 1.800 28.800 0.888 25.57
41 10 1 2 3.550 0.000 0.617 0.00
42 10 1 2 3.630 0.000 0.617 0.00
43 25 2 2 4 5.850 23.400 3.854 90.18
44 12 4 2 8 1.650 13.200 0.888 11.72
Page 1/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 2/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.000 36.000 6.313 227.27
2 32 3 1 3 12.000 36.000 6.313 227.27
3 32 3 1 3 5.500 16.500 6.313 104.16
4 32 2 1 2 9.500 19.000 6.313 119.95
5 32 2 1 2 12.000 24.000 6.313 151.51
6 32 2 1 2 8.000 16.000 6.313 101.01
7 32 3 1 3 6.000 18.000 6.313 113.63
8 32 3 1 3 12.000 36.000 6.313 227.27
9 32 3 1 3 9.400 28.200 6.313 178.03
10 32 2 1 2 3.400 6.800 6.313 42.93
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 12.000 24.000 6.313 151.51
13 32 3 1 3 10.910 32.730 6.313 206.62
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 2 1 2 6.160 12.320 6.313 77.78
16 32 2 1 2 12.000 24.000 6.313 151.51
17 32 2 1 2 6.000 12.000 6.313 75.76
18 32 3 1 3 12.000 36.000 6.313 227.27
19 32 3 2 6 7.110 42.660 6.313 269.31
20 32 2 1 2 7.110 14.220 6.313 89.77
21 32 2 1 2 12.000 24.000 6.313 151.51
22 32 3 1 3 12.000 36.000 6.313 227.27
23 32 3 1 3 2.010 6.030 6.313 38.07
24 32 2 1 2 2.010 4.020 6.313 25.38
25 32 2 1 2 12.000 24.000 6.313 151.51
27 a 10 5 2 10 12.000 120.000 0.617 74.04
27 b 10 5 2 10 12.000 120.000 0.617 74.04
27 c 10 5 2 10 3.070 30.700 0.617 18.94
28 a 10 11 1 11 12.010 132.110 0.617 81.51
28 b 10 11 1 11 12.000 132.000 0.617 81.44
28 c 10 11 1 11 2.800 30.800 0.617 19.00
29 a 32 6 1 6 12.000 72.000 6.313 454.54
29 b 32 3 1 3 4.440 13.320 6.313 84.09
30 10 148 1 148 4.050 599.400 0.617 369.83
31 10 148 1 148 3.420 506.160 0.617 312.30
32 10 148 1 148 1.920 284.160 0.617 175.33
33 10 148 1 148 3.450 510.600 0.617 315.04
34 10 148 1 148 1.060 156.880 0.617 96.79
35 10 148 1 148 1.100 162.800 0.617 100.45
36 10 148 4 592 0.540 319.680 0.617 197.24
37 32 44 1 44 0.540 23.760 6.313 150.00
38 32 27 1 27 0.540 14.580 6.313 92.04
39 16 8 2 16 3.190 51.040 1.578 80.54
40 12 4 4 16 2.870 45.920 0.888 40.78
41 10 1 2 3.550 0.000 0.617 0.00
42 10 1 2 3.630 0.000 0.617 0.00
43 25 2 2 4 5.850 23.400 3.854 90.18
44 12 4 2 8 1.650 13.200 0.888 11.72
Page 3/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1a 20 22 1 22 12.000 264.000 2.466 651.02
1b 20 22 1 22 11.930 262.460 2.466 647.23
1c 20 22 1 22 12.000 264.000 2.466 651.02
1d 20 22 1 22 11.930 262.460 2.466 647.23
2 16 6 1 6 4.430 26.580 1.578 41.94
3 20 24 1 24 4.620 110.880 2.466 273.43
4 20 112 1 112 4.620 517.440 2.466 1 276.01
5 16 11 1 11 3.770 41.470 1.578 65.44
6 16 4 2 8 5.000 40.000 1.578 63.12
7 12 10 1 10 0.600 6.000 0.888 5.33
8 12 10 3 30 0.600 18.000 0.888 15.98
44 12 4 2 1.650 0.000 0.888 0.00
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1a 20 22 1 22 10.380 228.360 2.466 563.14
1b 20 22 1 22 11.930 262.460 2.466 647.23
1c 20 22 1 22 10.380 228.360 2.466 563.14
1d 20 22 1 22 11.930 262.460 2.466 647.23
2 16 6 1 6 4.430 26.580 1.578 41.94
3 20 12 1 12 4.620 55.440 2.466 136.72
4 20 112 1 112 4.620 517.440 2.466 1 276.01
5 16 11 1 11 3.770 41.470 1.578 65.44
6 16 4 2 8 5.000 40.000 1.578 63.12
7 12 10 1 10 0.600 6.000 0.888 5.33
8 12 10 3 30 0.600 18.000 0.888 15.98
44 12 4 2 1.650 0.000 0.888 0.00
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1a 25 17 2 34 12.000 408.000 3.854 1 572.43
1b 25 17 1 17 6.000 102.000 3.854 393.11
1c 16 17 2 34 12.000 408.000 1.578 643.82
1d 16 17 1 17 6.000 102.000 1.578 160.96
2 16 6 1 6 4.560 27.360 1.578 43.17
3 20 24 1 24 4.750 114.000 2.466 281.12
4 20 139 1 139 4.750 660.250 2.466 1 628.18
5 16 13 1 13 3.730 48.490 1.578 76.52
6 16 4 2 8 3.000 24.000 1.578 37.87
7 16 12 1 12 0.600 7.200 1.578 11.36
8 12 12 3 36 0.600 21.600 0.888 19.18
44 12 4 2 1.650 0.000 0.888 0.00
Page 4/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1a 25 19 2 38 12.000 456.000 3.854 1 757.42
1b 25 19 1 19 7.400 140.600 3.854 541.87
1c 16 19 2 38 12.000 456.000 1.578 719.57
1d 16 19 1 19 7.400 140.600 1.578 221.87
2 16 6 1 6 4.500 27.000 1.578 42.61
3 20 24 1 24 4.690 112.560 2.466 277.57
4 20 149 1 149 4.690 698.810 2.466 1 723.27
5 16 13 1 13 3.730 48.490 1.578 76.52
6 16 4 2 8 3.000 24.000 1.578 37.87
7 16 13 1 13 0.600 7.800 1.578 12.31
8 12 13 3 39 0.600 23.400 0.888 20.78
44 12 4 2 1.650 0.000 0.888 0.00
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 25 19 1 19 12.000 228.000 3.854 878.71
2 25 19 1 19 8.310 157.890 3.854 608.51
3 20 24 1 24 4.690 112.560 2.466 277.57
4 20 90 1 90 4.690 422.100 2.466 1 040.90
5 16 6 1 6 4.500 27.000 1.578 42.61
6 16 8 1 8 3.730 29.840 1.578 47.09
7 20 4 6 24 0.610 14.640 2.466 36.10
8 16 4 2 8 2.660 21.280 1.578 33.58
9 6 6 1 6 0.600 3.600 0.222 0.80
10 6 18 1 18 0.430 7.740 0.222 1.72
44 12 4 2 1.650 0.000 0.888 0.00
Page 5/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 6/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 55 1 55 6.960 382.800 6.313 2 416.62
2 25 55 1 55 6.750 371.250 3.854 1 430.80
3 32 33 1 33 10.860 358.380 6.313 2 262.45
4 25 33 1 33 10.650 351.450 3.854 1 354.49
5 16 55 2 110 3.000 330.000 1.578 520.74
6 16 33 2 66 2.860 188.760 1.578 297.86
7 16 5 2 10 9.800 98.000 1.578 154.64
8 16 5 2 10 7.410 74.100 1.578 116.93
9 12 424 1 424 3.480 1 475.520 0.888 1 310.26
10 32 13 3 39 3.600 140.400 6.313 886.35
11 32 13 3 39 5.200 202.800 6.313 1 280.28
12 32 13 3 39 7.300 284.700 6.313 1 797.31
13 32 13 3 39 5.750 224.250 6.313 1 415.69
14 16 41 3 123 4.850 596.550 1.578 941.36
15 32 10 1 10 12.000 120.000 6.313 757.56
16 25 10 1 10 11.400 114.000 3.854 439.36
17 25 10 1 10 12.000 120.000 3.854 462.48
18 16 10 2 20 3.000 60.000 1.578 94.68
19 20 6 2 12 12.000 144.000 2.466 355.10
20 16 6 2 12 3.300 39.600 1.578 62.49
21 14 76 1 76 6.650 505.400 1.208 610.52
22 12 76 4 304 3.650 1 109.600 0.888 985.32
23 10 38 3 114 3.750 427.500 0.617 263.77
24 25 3 4 12 4.570 54.840 3.854 211.35
25 25 10 4 40 3.200 128.000 3.854 493.31
26 14 3 4 12 4.750 57.000 1.208 68.86
29 10 4 32 128 1.050 134.400 0.617 0.00
33 16 55 1 55 4.000 220.000 1.578 347.16
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
32 10 1 32 32 1.40 44.800 0.617 27.64
TOTAL 1 UNITE PLAN DE FERRAILLAGE : OA1 - Aciers rond lisses PILES P1 27.64
Page 7/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 55 1 55 6.960 382.800 6.313 2 416.62
2 25 55 1 55 6.750 371.250 3.854 1 430.80
3 32 33 1 33 10.860 358.380 6.313 2 262.45
4 25 33 1 33 10.650 351.450 3.854 1 354.49
5 16 55 2 110 3.000 330.000 1.578 520.74
6 16 33 2 66 2.860 188.760 1.578 297.86
7 16 5 2 10 9.800 98.000 1.578 154.64
8 16 5 2 10 7.410 74.100 1.578 116.93
9 12 424 1 424 3.480 1 475.520 0.888 1 310.26
10 32 13 3 39 3.600 140.400 6.313 886.35
11 32 13 3 39 5.200 202.800 6.313 1 280.28
12 32 13 3 39 7.600 296.400 6.313 1 871.17
13 32 13 3 39 6.100 237.900 6.313 1 501.86
14 16 44 3 132 4.850 640.200 1.578 1 010.24
15 32 10 1 10 12.000 120.000 6.313 757.56
16 25 10 1 10 11.400 114.000 3.854 439.36
17 25 10 1 10 12.000 120.000 3.854 462.48
18 16 10 2 20 3.000 60.000 1.578 94.68
19 20 6 2 12 12.000 144.000 2.466 355.10
20 16 6 2 12 3.300 39.600 1.578 62.49
21 14 76 1 76 6.650 505.400 1.208 610.52
22 12 76 4 304 3.650 1 109.600 0.888 985.32
23 10 38 3 114 3.750 427.500 0.617 263.77
24 25 3 4 12 4.570 54.840 3.854 211.35
25 25 10 4 40 3.200 128.000 3.854 493.31
26 14 3 4 12 4.750 57.000 1.208 68.86
27 12 5 10 50 2.150 107.500 0.888 0.00
28 12 6 10 60 2.050 123.000 0.888 0.00
29 10 4 32 128 1.050 134.400 0.617 0.00
30 10 1 28 28 5.500 154.000 0.617 0.00
31 10 1 28 28 5.400 151.200 0.617 0.00
33 16 55 1 55 4.000 220.000 1.578 347.16
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
32 10 1 32 32 1.40 44.800 0.617 27.64
TOTAL 1 UNITE PLAN DE FERRAILLAGE : OA1 - Aciers rond lisses PILES P2 27.64
Page 8/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 55 1 55 6.960 382.800 6.313 2 416.62
2 25 55 1 55 6.750 371.250 3.854 1 430.80
3 32 33 1 33 10.860 358.380 6.313 2 262.45
4 25 33 1 33 10.650 351.450 3.854 1 354.49
5 16 55 2 110 3.000 330.000 1.578 520.74
6 16 33 2 66 2.860 188.760 1.578 297.86
7 16 5 2 10 9.800 98.000 1.578 154.64
8 16 5 2 10 7.410 74.100 1.578 116.93
9 12 424 1 424 3.480 1 475.520 0.888 1 310.26
10 32 13 3 39 3.600 140.400 6.313 886.35
11 32 13 3 39 5.200 202.800 6.313 1 280.28
12 32 13 3 39 8.620 336.180 6.313 2 122.30
13 32 13 3 39 7.100 276.900 6.313 1 748.07
14 16 47 3 141 4.850 683.850 1.578 1 079.12
15 32 10 1 10 12.000 120.000 6.313 757.56
16 25 10 1 10 11.400 114.000 3.854 439.36
17 25 10 1 10 12.000 120.000 3.854 462.48
18 16 10 2 20 3.000 60.000 1.578 94.68
19 20 6 2 12 12.000 144.000 2.466 355.10
20 16 6 2 12 3.300 39.600 1.578 62.49
21 14 76 1 76 6.650 505.400 1.208 610.52
22 12 76 4 304 3.650 1 109.600 0.888 985.32
23 10 38 3 114 3.750 427.500 0.617 263.77
24 25 3 4 12 4.570 54.840 3.854 211.35
25 25 10 4 40 3.200 128.000 3.854 493.31
26 14 3 4 12 4.750 57.000 1.208 68.86
27 12 5 10 50 2.150 107.500 0.888 0.00
28 12 6 10 60 2.050 123.000 0.888 0.00
29 10 4 32 128 1.050 134.400 0.617 0.00
30 10 1 28 28 5.500 154.000 0.617 0.00
31 10 1 28 28 5.400 151.200 0.617 0.00
33 16 55 1 55 4.000 220.000 1.578 347.16
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
32 10 1 32 32 1.40 44.800 0.617 27.64
TOTAL 1 UNITE PLAN DE FERRAILLAGE : OA1 - Aciers rond lisses PILES P3 27.64
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
M.AZAMI A .TARMIDI H ARAB
Page 9/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 55 1 55 6.960 382.800 6.313 2 416.62
2 25 55 1 55 6.750 371.250 3.854 1 430.80
3 32 33 1 33 10.860 358.380 6.313 2 262.45
4 25 33 1 33 10.650 351.450 3.854 1 354.49
5 16 55 2 110 2.910 320.100 1.578 505.12
6 16 33 2 66 2.860 188.760 1.578 297.86
7 16 5 2 10 9.800 98.000 1.578 154.64
8 16 5 2 10 7.410 74.100 1.578 116.93
9 12 424 1 424 3.460 1 467.040 0.888 1 302.73
10 32 12 3 36 3.480 125.280 6.313 790.89
11 32 12 3 36 5.080 182.880 6.313 1 154.52
12 32 12 3 36 10.080 362.880 6.313 2 290.86
13 32 12 3 36 8.480 305.280 6.313 1 927.23
14 16 59 3 177 4.680 828.360 1.578 1 307.15
15 32 10 1 10 11.99 119.900 6.313 756.93
16 25 10 1 10 11.39 113.900 3.854 438.97
17 25 10 1 10 11.99 119.900 3.854 462.09
18 16 10 2 20 2.92 58.400 1.578 92.16
19 20 6 2 12 11.98 143.760 2.466 354.51
20 16 6 2 12 3.22 38.640 1.578 60.97
21 14 76 1 76 6.63 503.880 1.208 608.69
22 12 76 4 304 3.64 1 106.560 0.888 982.63
23 10 38 3 114 3.68 419.520 0.617 258.84
24 25 3 4 12 4.43 53.160 3.854 204.88
25 25 10 4 40 3.06 122.400 3.854 471.73
26 14 3 4 12 4.74 56.880 1.208 68.71
27 12 5 10 50 2.08 104.000 0.888 0.00
28 12 6 10 60 1.98 118.800 0.888 0.00
29 10 4 32 128 0.98 125.440 0.617 0.00
30 10 1 28 28 5.49 153.720 0.617 0.00
31 10 1 28 28 5.35 149.800 0.617 0.00
32 10 1 32 32 1.40 44.800 0.617 0.00
44 12 4 2 1.650 0.000 0.888 0.00
33 16 55 1 55 4.00 220.000 1.578 347.16
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 61 1 61 6.96 424.560 6.313 2 680.25
2 25 61 1 61 6.75 411.750 3.854 1 586.88
3 32 32 1 32 11.96 382.720 6.313 2 416.11
4 25 32 1 32 11.75 376.000 3.854 1 449.10
5 16 61 2 122 2.91 355.020 1.578 560.22
6 16 32 2 64 2.86 183.040 1.578 288.84
7 16 6 2 12 10.90 130.800 1.578 206.40
8 16 6 2 12 7.41 88.920 1.578 140.32
Page 10/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 11/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 61 1 61 6.96 424.560 6.313 2 680.25
2 25 61 1 61 6.75 411.750 3.854 1 586.88
3 32 32 1 32 11.96 382.720 6.313 2 416.11
4 25 32 1 32 11.75 376.000 3.854 1 449.10
5 16 61 2 122 2.91 355.020 1.578 560.22
6 16 32 2 64 2.86 183.040 1.578 288.84
7 16 6 2 12 10.90 130.800 1.578 206.40
8 16 6 2 12 7.41 88.920 1.578 140.32
9 12 361 1 361 3.48 1 256.280 0.888 1 115.58
10 32 26 4 104 5.00 520.000 6.313 3 282.76
14 20 10 4 40 4.85 194.000 2.466 478.40
15 25 13 1 13 12.00 156.000 3.854 601.22
16 20 13 1 13 11.99 155.870 2.466 384.38
17 16 13 1 13 2.42 31.460 1.578 49.64
18 20 8 2 16 12.00 192.000 2.466 473.47
19 16 8 2 16 3.08 49.280 1.578 77.76
20 25 3 1 3 12.00 36.000 3.854 138.74
21 14 76 1 76 5.40 410.400 1.208 495.76
22 12 76 1 76 2.10 159.600 0.888 141.72
23 14 76 1 76 0.80 60.800 1.208 73.45
24 14 76 5 380 2.12 805.600 1.208 973.16
25 16 76 1 76 3.10 235.600 1.578 371.78
26 16 76 1 76 3.10 235.600 1.578 371.78
27 12 13 2 26 6.25 162.500 0.888 144.30
28 12 1 2 2 6.25 12.500 0.888 11.10
29 12 13 1 13 11.90 154.700 0.888 137.37
30 12 1 2 2 6.25 12.500 0.888 11.10
31 10 228 1 228 0.70 159.600 0.617 98.47
32 14 13 2 26 2.54 66.040 1.208 79.78
33 14 2 2 4 2.00 8.000 1.208 9.66
34 20 3 2 6 5.50 33.000 2.466 81.38
35 20 13 2 26 4.20 109.200 2.466 269.29
36 20 7 2 14 2.50 35.000 2.466 86.31
37 12 3 2 6 3.75 22.500 0.888 19.98
Page 12/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
53 25 21 1 21 0.80 16.800 3.854 64.75
62 10 1 8 8 1.40 11.200 0.617 0.00
TOTAL 1 UNITE PLAN DE FERRAILLAGE : OA1 - Aciers rond lisses culeé C1et C2 64.74
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 10 960 9600 3.22 30 912.000 0.617 19 072.70
2 10 10 480 4800 0.94 4 512.000 0.617 2 783.90
3 10 6 40 240 3.28 787.200 0.617 485.70
4 10 10 20 200 0.54 108.000 0.617 66.64
5 10 7 32 224 3.28 734.720 0.617 453.32
6 10 10 16 160 0.64 102.400 0.617 63.18
7 10 3 16 48 3.28 157.440 0.617 97.14
8 10 10 8 80 0.24 19.200 0.617 11.85
10 10 24720 1 24720 0.53 13 101.600 0.617 8 083.69
11 20 705 1 705 11.39 8 029.950 2.466 19 801.86
12a 12 82 2 164 12.00 1 968.000 0.888 1 747.58
12b 12 82 2 164 12.00 1 968.000 0.888 1 747.58
12c 12 82 2 164 2.58 423.120 0.888 375.73
13a 12 82 2 164 12.00 1 968.000 0.888 1 747.58
13b 12 82 2 164 12.00 1 968.000 0.888 1 747.58
13c 12 82 2 164 2.58 423.120 0.888 375.73
Page 13/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
9 8 2 524 1 048 0.44 461.120 0.395 182.14
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 50 1 50 0.980 49.000 0.617 30.23
10 50 1 50 1.050 52.500 0.617 32.39
10 14 1 14 9.700 135.800 0.617 83.79
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
6 7 1 7 0.660 4.620 0.222 1.03
6 4 1 4 1.190 4.760 0.222 1.06
Page 14/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 12 33 1 33 1.900 62.700 0.888 55.68
2 10 17 1 17 0.700 11.900 0.617 7.34
3 10 17 1 17 3.290 55.930 0.617 34.51
4 10 6 1 6 3.290 19.740 0.617 12.18
5 10 33 1 33 3.790 125.070 0.617 77.17
6 10 3 1 3 3.380 10.140 0.617 6.26
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
levage 16 1 2 2 2.400 4.800 1.578 7.57
Page 15/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 25 70 1 70 5.550 388.500 3.854 1 497.28
2 20 70 1 70 5.380 376.600 2.466 928.70
3 25 33 1 33 10.650 351.450 3.854 1 354.49
4 25 33 1 33 10.650 351.450 3.854 1 354.49
5 16 57 2 114 2.610 297.540 1.578 469.52
6 16 33 2 66 2.560 168.960 1.578 266.62
7 16 5 2 10 9.800 98.000 1.578 154.64
8 16 5 2 10 6.210 62.100 1.578 97.99
9 10 544 1 544 2.740 1 490.560 0.617 919.68
10 32 10 3 30 3.180 95.400 6.313 602.26
11 32 10 3 30 4.780 143.400 6.313 905.28
12 32 12 3 36 11.380 409.680 6.313 2 586.31
13 32 12 3 36 9.780 352.080 6.313 2 222.68
14 16 51 3 153 4.710 720.630 1.578 1 137.15
15 32 10 1 10 11.990 119.900 6.313 756.93
16 25 10 1 10 11.390 113.900 3.854 438.97
17 25 10 1 10 11.990 119.900 3.854 462.09
18 16 10 2 20 2.920 58.400 1.578 92.16
19 20 6 2 12 11.980 143.760 2.466 354.51
20 16 6 2 12 3.220 38.640 1.578 60.97
21 14 76 1 76 6.630 503.880 1.208 608.69
22 12 76 4 304 3.640 1 106.560 0.888 982.63
23 10 38 3 114 3.680 419.520 0.617 258.84
24 25 3 4 12 4.430 53.160 3.854 204.88
25 25 10 4 40 3.060 122.400 3.854 471.73
26 14 3 4 12 4.740 56.880 1.208 68.71
29 10 4 32 128 0.980 125.440 0.000 0.00
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
54 25 22 1 22 0.80 17.60 3.854 67.83
32 10 1 16 16 1.400 22.400 0.000 0.00
63 10 1 8 8 1.400 11.200 0.617 6.91
Page 16/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 17/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 18/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 25 78 1 78 6.750 526.500 3.854 2 029.13
2 25 78 1 78 6.750 526.500 3.854 2 029.13
3 25 41 1 41 11.750 481.750 3.854 1 856.66
4 25 41 1 41 11.750 481.750 3.854 1 856.66
5 16 78 2 156 2.610 407.160 1.578 642.50
6 16 41 2 82 2.650 217.300 1.578 342.90
7 16 5 2 10 10.900 109.000 1.578 172.00
8 16 5 2 10 7.410 74.100 1.578 116.93
9 10 760 1 760 2.740 2 082.400 0.617 1 284.84
10 32 24 4 96 4.600 441.600 6.313 2 787.82
11 20 8 4 32 4.850 155.200 2.466 382.72
15 25 13 1 13 12.000 156.000 3.854 601.22
16 20 13 1 13 11.990 155.870 2.466 384.38
17 16 13 2 26 2.420 62.920 1.578 99.29
18 20 8 2 16 11.99 191.84 2.466 473.08
19 16 8 2 16 3.08 49.28 1.578 77.76
20 25 3 1 3 12.00 36.00 3.854 138.74
21 14 76 1 76 5.30 402.80 1.208 486.58
22 12 76 1 76 2.08 158.08 0.888 140.38
23 14 76 1 76 0.80 60.80 1.208 73.45
24 10 76 5 380 2.12 805.60 0.617 497.06
25 16 76 1 76 3.08 234.08 1.578 369.38
26 12 76 1 76 3.09 234.84 0.888 208.54
27 12 13 1 13 12.00 156.00 0.888 138.53
28 12 13 1 13 1.01 13.13 0.888 11.66
29 12 1 1 1 5.34 5.34 0.888 4.74
30 12 13 1 13 11.57 150.41 0.888 133.56
31 12 1 1 1 5.33 5.33 0.888 4.73
32 10 222 1 222 0.69 153.18 0.617 94.51
33 14 13 1 13 2.53 32.89 1.208 39.73
34 14 2 1 2 1.96 3.92 1.208 4.74
Page 19/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.000 36.000 6.313 227.27
2 32 3 1 3 12.000 36.000 6.313 227.27
3 32 3 1 3 5.500 16.500 6.313 104.16
4 32 2 1 2 9.500 19.000 6.313 119.95
5 32 2 1 2 12.000 24.000 6.313 151.51
6 32 2 1 2 8.000 16.000 6.313 101.01
7 32 3 1 3 6.000 18.000 6.313 113.63
8 32 3 1 3 12.000 36.000 6.313 227.27
9 32 3 1 3 9.400 28.200 6.313 178.03
10 32 2 1 2 3.400 6.800 6.313 42.93
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 12.000 24.000 6.313 151.51
13 32 3 1 3 10.910 32.730 6.313 206.62
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 2 1 2 6.160 12.320 6.313 77.78
16 32 2 1 2 12.000 24.000 6.313 151.51
17 32 2 1 2 6.000 12.000 6.313 75.76
18 32 3 1 3 12.000 36.000 6.313 227.27
19 32 3 2 6 7.110 42.660 6.313 269.31
20 32 2 1 2 7.110 14.220 6.313 89.77
21 32 2 1 2 12.000 24.000 6.313 151.51
22 32 3 1 3 12.000 36.000 6.313 227.27
23 32 3 1 3 2.010 6.030 6.313 38.07
24 32 2 1 2 2.010 4.020 6.313 25.38
25 32 2 1 2 12.000 24.000 6.313 151.51
Page 20/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.000 36.000 6.313 227.27
2 32 3 1 3 12.000 36.000 6.313 227.27
3 32 3 1 3 5.500 16.500 6.313 104.16
4 32 2 1 2 9.500 19.000 6.313 119.95
5 32 2 1 2 12.000 24.000 6.313 151.51
6 32 2 1 2 8.000 16.000 6.313 101.01
7 32 3 1 3 6.000 18.000 6.313 113.63
8 32 3 1 3 12.000 36.000 6.313 227.27
9 32 3 1 3 9.400 28.200 6.313 178.03
10 32 2 1 2 3.400 6.800 6.313 42.93
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 12.000 24.000 6.313 151.51
13 32 3 1 3 10.910 32.730 6.313 206.62
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 2 1 2 6.160 12.320 6.313 77.78
16 32 2 1 2 12.000 24.000 6.313 151.51
17 32 2 1 2 6.000 12.000 6.313 75.76
18 32 3 1 3 12.000 36.000 6.313 227.27
19 32 3 2 6 7.110 42.660 6.313 269.31
20 32 2 1 2 7.110 14.220 6.313 89.77
21 32 2 1 2 12.000 24.000 6.313 151.51
22 32 3 1 3 12.000 36.000 6.313 227.27
23 32 3 1 3 2.010 6.030 6.313 38.07
24 32 2 1 2 2.010 4.020 6.313 25.38
25 32 2 1 2 12.000 24.000 6.313 151.51
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
M.AZAMI A .TARMIDI H. ARAB
Page 21/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 10 576 5760 3.22 18 547.200 0.617 11 443.62
2 10 10 288 2880 0.94 2 707.200 0.617 1 670.34
3 10 6 24 144 3.28 472.320 0.617 291.42
4 10 10 12 120 0.54 64.800 0.617 39.98
5 10 7 16 112 3.28 367.360 0.617 226.66
6 10 10 8 80 0.64 51.200 0.617 31.59
7 10 3 16 48 3.28 157.440 0.617 97.14
8 10 10 8 80 0.24 19.200 0.617 11.85
10 10 14880 1 14880 0.53 7 886.400 0.617 4 865.91
11 20 423 1 423 11.39 4 817.970 2.466 11 881.11
12a 12 82 2 164 12.00 1 968.000 0.888 1 747.58
12b 12 82 2 164 12.00 1 968.000 0.888 1 747.58
12c 12 82 2 164 2.58 423.120 0.888 375.73
13a 12 82 2 164 12.00 1 968.000 0.888 1 747.58
13b 12 82 2 164 12.00 1 968.000 0.888 1 747.58
13c 12 82 2 164 2.58 423.120 0.888 375.73
14a 12 82 1 82 12.00 984.000 0.888 873.79
14b 12 82 1 82 12.00 984.000 0.888 873.79
14c 12 82 1 82 2.11 173.020 0.888 153.64
15a 12 82 1 82 12.00 984.000 0.888 873.79
15b 12 82 1 82 12.00 984.000 0.888 873.79
15c 12 82 1 82 2.11 173.020 0.888 153.64
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
Page 22/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 23/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 10 576 5 760 3.22 18 547.200 0.617 11 443.62
2 10 10 288 2 880 0.94 2 707.200 0.617 1 670.34
3 10 6 24 144 3.28 472.320 0.617 291.42
4 10 10 12 120 0.54 64.800 0.617 39.98
5 10 7 16 112 3.28 367.360 0.617 226.66
6 10 10 8 80 0.64 51.200 0.617 31.59
7 10 3 16 48 3.28 157.440 0.617 97.14
8 10 10 8 80 0.24 19.200 0.617 11.85
10 10 14880 1 14 880 0.53 7 886.400 0.617 4 865.91
22 10 10 24 240 3.30 792.000 0.617 488.66
23 10 10 24 240 2.93 703.200 0.617 433.87
24 10 20 24 480 0.54 259.200 0.617 159.93
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
9 8 2 316 632 0.44 278.080 0.395 109.84
29 10 2 48 96 1.28 122.880 0.617 75.82
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
Page 24/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 25/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 48 1 48 6.960 334.080 6.313 2 109.05
2 20 48 1 48 6.580 315.840 2.466 778.86
3 32 48 1 48 6.960 334.080 6.313 2 109.05
4 20 48 1 48 6.580 315.840 2.466 778.86
5 16 48 2 96 2.710 260.160 1.578 410.53
6 16 48 2 96 2.650 254.400 1.578 401.44
7 16 5 2 10 7.410 74.100 1.578 116.93
8 16 5 2 10 5.900 59.000 1.578 93.10
9 10 576 1 576 2.880 1 658.880 0.617 1 023.53
10 32 13 1 13 4.960 64.480 6.313 407.06
11 32 13 1 13 3.360 43.680 6.313 275.75
12 32 13 1 13 8.400 109.200 6.313 689.38
13 32 13 1 13 10.000 130.000 6.313 820.69
14 25 13 1 13 3.070 39.910 3.854 153.81
15 25 13 1 13 4.320 56.160 3.854 216.44
16 25 13 1 13 10.490 136.370 3.854 525.57
17 25 13 1 13 9.250 120.250 3.854 463.44
18 20 13 1 13 2.840 36.920 2.466 91.04
19 20 13 1 13 3.840 49.920 2.466 123.10
20 20 13 1 13 10.000 130.000 2.466 320.58
21 20 13 1 13 9.000 117.000 2.466 288.52
22 16 69 1 69 6.900 476.100 1.578 751.29
23 16 69 1 69 5.190 358.110 1.578 565.10
24 10 13 65 845 1.410 1 191.450 0.617 735.12
25 32 20 1 20 6.330 126.600 6.313 799.23
26a 32 20 1 20 12.000 240.000 6.313 1 515.12
26b 32 20 1 20 2.390 47.800 6.313 301.76
27a 32 20 1 20 12.000 240.000 6.313 1 515.12
27b 32 20 1 20 2.390 47.800 6.313 301.76
28 32 20 2 40 6.470 258.800 6.313 1 633.80
29a 20 5 2 10 12.000 120.000 2.466 295.92
29b 20 5 2 10 1.790 17.900 2.466 44.14
30 20 7 2 14 7.680 107.520 2.466 265.14
31a 20 8 1 8 12.000 96.000 2.466 236.74
31b 20 8 1 8 1.750 14.000 2.466 34.52
32 10 64 1 64 2.300 147.200 0.617 90.82
33 10 8 1 8 8.960 71.680 0.617 44.23
34 10 44 1 44 2.300 101.200 0.617 62.44
35 16 10 1 10 8.800 88.000 1.578 138.86
36 16 27 2 54 7.610 410.940 1.578 648.46
37 14 40 1 40 4.810 192.400 1.208 232.42
38 10 10 1 10 4.080 40.800 0.617 25.17
39 14 27 8 216 3.620 781.920 1.208 944.56
40 10 27 2 54 2.890 156.060 0.617 96.29
41 14 5 2 10 3.620 36.200 1.208 43.73
42 10 168 1 168 4.790 804.720 0.617 496.51
43 25 5 4 20 5.310 106.200 3.854 409.29
44 25 11 4 44 3.690 162.360 3.854 625.74
45 14 3 4 12 5.230 62.760 1.208 75.81
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 71 1 71 10.840 769.640 6.313 4858.737
2 32 71 1 71 10.840 769.640 6.313 4858.737
3 25 71 1 71 10.620 754.020 3.854 2905.993
4a 32 60 1 60 12.000 720.000 6.313 4545.36
4b 32 60 1 60 3.410 204.600 6.313 1291.639
5a 25 60 1 60 12.000 720.000 3.854 2774.88
5b 25 60 1 60 2.850 171.000 3.854 659.034
6 16 71 2 142 3.210 455.820 1.578 719.283
7 16 60 2 120 3.140 376.800 1.578 594.59
8a 16 6 2 12 12.000 144.000 1.578 227.232
8b 16 6 2 12 1.480 17.760 1.578 28.025
9 16 6 2 12 11.200 134.400 1.578 212.083
10 10 1 020 1 1 020 3.950 4 029.000 0.617 2485.893
11 32 37 1 37 4.780 176.860 6.313 1116.517
12 32 38 1 38 6.380 242.440 6.313 1530.523
13 32 37 1 37 6.88 254.560 6.313 1607.037
14 32 38 1 38 5.28 200.640 6.313 1266.64
15 25 37 1 37 4.060 150.220 3.854 578.947
16 25 38 1 38 5.310 201.780 3.854 777.66
17 25 37 1 37 7.85 290.450 3.854 1119.394
18 25 38 1 38 6.60 250.800 3.854 966.583
19 25 3 2 6 4.130 24.780 3.854 95.502
Page 26/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
20 25 3 2 6 5.390 32.340 3.854 124.638
21 25 3 1 3 6.97 20.910 3.854 80.587
22 25 3 1 3 5.72 17.160 3.854 66.134
23a 16 46 2 92 12.00 1 104.000 1.578 1742.112
23b 16 46 2 92 1.55 142.600 1.578 225.022
24 16 46 2 92 2.70 248.400 1.578 391.975
25 10 1058 1 1 058 3.29 3 480.820 0.617 2147.665
26 10 46 1 46 3.09 142.140 0.617 87.7
27 10 46 1 46 3.11 143.060 0.617 88.268
28a 25 6 1 6 12.00 72.000 3.854 277.488
28b 25 6 1 6 4.31 25.860 3.854 99.664
29a 25 3 1 3 12.00 36.000 3.854 138.744
29b 25 3 1 3 2.89 8.670 3.854 33.414
30a 12 6 1 6 12.00 72.000 0.888 63.936
30b 12 6 1 6 1.77 10.620 0.888 9.43
31 16 75 1 75 1.50 112.500 1.578 177.525
32 16 75 1 75 2.52 189.000 1.578 298.242
33 14 75 1 75 0.90 67.500 1.208 81.54
34a 14 13 1 13 12.00 156.000 1.208 188.448
34b 14 13 1 13 2.52 32.760 1.208 39.574
35a 14 13 1 13 12.00 156.000 1.208 188.448
35b 14 13 1 13 1.63 21.190 1.208 25.597
36 16 92 1 92 2.52 231.840 1.578 365.843
37 12 92 1 92 2.82 259.440 0.888 230.382
38 10 315 1 315 0.75 236.250 0.617 145.766
39 25 5 2 10 5.32 53.200 3.854 205.032
40 25 11 2 22 3.34 73.480 3.854 283.191
41 14 3 2 6 5.23 31.380 1.208 37.907
42 12 5 5 25 1.68 42.000 0.888 0
43 12 6 5 30 1.58 47.400 0.888 0
44 10 0 6 5.27 0.000 0.617 0
45 10 0 6 5.29 0.000 0.617 0
46 10 4 8 32 0.73 23.360 0.617 0
47 12 3 1 3 11.60 34.800 0.888 30.902
48 20 3 1 3 11.90 35.700 2.466 88.036
49 8 46 1 46 1.71 78.660 0.395 31.07
50 10 12 1 12 11.56 138.720 0.617 85.59
51 12 27 1 27 11.60 313.200 0.888 278.121
52 10 35 1 35 4.82 168.700 0.617 104.087
53 25 75 1 75 5.07 380.250 3.854 1465.483
55 14 12 1 12 2.54 30.480 1.208 36.819
56 12 2 1 2 2.32 4.640 0.888 4.12
57 25 17 1 17 5.400 91.800 3.854 353.797
58 25 17 1 17 4.150 70.550 3.854 271.899
59 20 17 1 17 8.13 138.210 2.466 340.825
60 20 17 1 17 9.37 159.290 2.466 392.809
61 16 18 1 18 4.100 73.800 1.578 116.456
62 16 18 1 18 3.300 59.400 1.578 93.733
63 14 18 1 18 8.60 154.800 1.208 186.998
64 14 18 1 18 9.40 169.200 1.208 204.393
65 20 33 1 33 7.24 238.920 2.466 589.176
66 14 33 1 33 7.22 238.260 1.208 287.818
67 25 2 1 2 6.20 12.400 3.854 47.789
68 25 12 1 12 7.27 87.240 3.854 336.222
69 25 3 1 3 8.29 24.870 3.854 95.848
70 14 2 1 2 6.00 12.000 1.208 14.496
71 14 12 1 12 7.07 84.840 1.208 102.486
72 14 3 1 3 8.09 24.270 1.208 29.318
73 20 3 1 3 8.63 25.890 2.466 63.844
74 20 3 1 3 4.56 13.680 2.466 33.734
75 14 30 1 30 2.24 67.200 1.208 81.177
76 10 431 1 431 1.06 456.860 0.617 281.882
77 14 10 1 10 3.20 32.000 1.208 38.656
78 14 2 1 2 1.92 3.840 1.208 4.638
79 25 18 1 18 5.400 97.200 3.854 374.608
80 25 18 1 18 4.150 74.700 3.854 287.893
81 20 18 1 18 8.62 155.160 2.466 382.624
82 20 18 1 18 9.86 177.480 2.466 437.665
83 16 18 1 18 4.100 73.800 1.578 116.456
84 16 18 1 18 3.300 59.400 1.578 93.733
85 14 18 1 18 9.10 163.800 1.208 197.87
86 14 18 1 18 9.90 178.200 1.208 215.265
87 20 36 1 36 7.76 279.360 2.466 688.901
88 14 36 1 36 7.28 262.080 1.208 316.592
90 25 14 1 14 7.89 110.460 3.854 425.712
91 25 3 1 3 9.06 27.180 3.854 104.751
93 14 14 1 14 6.99 97.860 1.208 118.214
94 14 3 1 3 8.11 24.330 1.208 29.39
95 20 3 1 3 8.44 25.320 2.466 62.439
96 20 3 1 3 4.44 13.320 2.466 32.847
97 14 30 1 30 2.24 67.200 1.208 81.177
98 10 454 1 454 1.06 481.240 0.617 296.925
99 12 36 1 36 1.12 40.320 0.888 35.804
100 12 2 1 2 7.29 14.580 0.888 12.947
101 12 36 1 36 1.32 47.520 0.888 42.197
Page 27/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
102 12 2 1 2 7.28 14.560 0.888 12.929
ajouter 10 51 2 102 1.24 126.480 0.617 78.038
ajouter 10 2 2 4 7.28 29.120 0.617 17.967
Page 28/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : CULEE C1 N° PLAN : PE-BOU-B-F112 + PE-BOU-B-F113
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 71 1 71 10.840 769.640 6.313 4 858.74
2 32 71 1 71 10.840 769.640 6.313 4 858.74
3 25 71 1 71 10.620 754.020 3.854 2 905.99
4a 32 60 1 60 12.000 720.000 6.313 4 545.36
4b 32 60 1 60 3.410 204.600 6.313 1 291.64
5a 25 60 1 60 12.000 720.000 3.854 2 774.88
5b 25 60 1 60 2.850 171.000 3.854 659.03
6 16 71 2 142 3.210 455.820 1.578 719.28
7 16 60 2 120 3.140 376.800 1.578 594.59
8a 16 6 2 12 12.000 144.000 1.578 227.23
8b 16 6 2 12 1.480 17.760 1.578 28.03
9 16 6 2 12 11.200 134.400 1.578 212.08
10 10 1 020 1 1 020 3.950 4 029.000 0.617 2 485.89
11 32 37 1 37 4.780 176.860 6.313 1 116.52
12 32 38 1 38 6.380 242.440 6.313 1 530.52
13 32 37 1 37 6.88 254.560 6.313 1 607.04
14 32 38 1 38 5.28 200.640 6.313 1 266.64
15 25 37 1 37 4.060 150.220 3.854 578.95
16 25 38 1 38 5.310 201.780 3.854 777.66
17 25 37 1 37 7.85 290.450 3.854 1 119.39
18 25 38 1 38 6.60 250.800 3.854 966.58
19 25 3 2 6 4.130 24.780 3.854 95.50
20 25 3 2 6 5.390 32.340 3.854 124.64
21 25 3 1 3 6.97 20.910 3.854 80.59
22 25 3 1 3 5.72 17.160 3.854 66.13
23a 16 46 2 92 12.00 1 104.000 1.578 1 742.11
23b 16 46 2 92 1.55 142.600 1.578 225.02
24 16 46 2 92 2.70 248.400 1.578 391.98
25 10 1058 1 1 058 3.29 3 480.820 0.617 2 147.67
26 10 46 1 46 3.09 142.140 0.617 87.70
27 10 46 1 46 3.11 143.060 0.617 88.27
28a 25 6 1 6 12.00 72.000 3.854 277.49
28b 25 6 1 6 4.31 25.860 3.854 99.66
29a 25 3 1 3 12.00 36.000 3.854 138.74
29b 25 3 1 3 2.89 8.670 3.854 33.41
30a 12 6 1 6 12.00 72.000 0.888 63.94
30b 12 6 1 6 1.77 10.620 0.888 9.43
31 16 75 1 75 1.50 112.500 1.578 177.53
32 16 75 1 75 2.52 189.000 1.578 298.24
33 14 75 1 75 0.90 67.500 1.208 81.54
34a 14 13 1 13 12.00 156.000 1.208 188.45
34b 14 13 1 13 2.52 32.760 1.208 39.57
35a 14 13 1 13 12.00 156.000 1.208 188.45
35b 14 13 1 13 1.63 21.190 1.208 25.60
35c 14 2 2 4 6.21 24.840 1.208 30.01
36 16 92 1 92 2.52 231.840 1.578 365.84
37 12 92 1 92 2.77 254.840 0.888 226.30
38 10 315 1 315 0.75 236.250 0.617 145.77
39 25 5 2 10 5.32 53.200 3.854 205.03
40 25 11 2 22 3.34 73.480 3.854 283.19
41 14 3 2 6 5.23 31.380 1.208 37.91
42 12 5 5 25 1.68 42.000 0.888 0.00
43 12 6 5 30 1.58 47.400 0.888 0.00
46 10 4 16 64 0.73 46.720 0.000 0.00
47 12 3 1 3 11.90 35.700 0.888 31.70
48 20 3 1 3 11.60 34.800 2.466 85.82
49 8 46 1 46 1.71 78.660 0.395 31.07
50 10 13 1 13 11.56 150.280 0.617 92.72
51 12 27 1 27 11.60 313.200 0.888 278.12
52 10 35 1 35 4.82 168.700 0.617 104.09
53 25 75 1 75 4.86 364.500 3.854 1 404.78
55 14 10 1 10 2.54 25.400 1.208 30.68
56 12 2 1 2 1.89 3.780 0.888 3.36
57 25 17 1 17 5.400 91.800 3.854 353.80
58 25 17 1 17 4.150 70.550 3.854 271.90
59 20 17 1 17 8.29 140.930 2.466 347.53
60 20 17 1 17 9.55 162.350 2.466 400.36
61 16 18 1 18 4.100 73.800 1.578 116.46
62 16 18 1 18 3.300 59.400 1.578 93.73
63 14 18 1 18 8.78 158.040 1.208 190.91
64 14 18 1 18 9.58 172.440 1.208 208.31
65 20 33 1 33 7.24 238.920 2.466 589.18
66 14 33 1 33 7.22 238.260 1.208 287.82
67 25 2 1 2 7.88 15.760 3.854 60.74
68 25 11 1 11 7.44 81.840 3.854 315.41
69 25 3 1 3 8.29 24.870 3.854 95.85
70 14 2 1 2 7.65 15.300 1.208 18.48
71 14 11 1 11 7.23 79.530 1.208 96.07
72 14 3 1 3 8.09 24.270 1.208 29.32
73 20 3 1 3 8.63 25.890 2.466 63.84
74 20 3 1 3 4.56 13.680 2.466 33.73
75 14 30 1 30 2.34 70.200 1.208 84.80
76 10 440 1 440 1.06 466.400 0.617 287.77
Page 29/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
77 14 10 1 10 3.20 32.000 1.208 38.66
78 14 2 1 2 2.06 4.120 1.208 4.98
79 25 18 1 18 5.400 97.200 3.854 374.61
80 25 18 1 18 4.150 74.700 3.854 287.89
81 20 18 1 18 7.90 142.200 2.466 350.67
82 20 18 1 18 9.15 164.700 2.466 406.15
83 16 18 1 18 4.100 73.800 1.578 116.46
84 16 18 1 18 3.300 59.400 1.578 93.73
85 14 18 1 18 8.38 150.840 1.208 182.21
86 14 18 1 18 9.18 165.240 1.208 199.61
87 20 31 1 31 7.76 240.560 2.466 593.22
88 14 31 1 31 7.28 225.680 1.208 272.62
89 25 4 1 4 8.69 34.760 3.854 133.97
90 25 8 1 8 8.44 67.520 3.854 260.22
91 25 3 1 3 9.06 27.180 3.854 104.75
92 14 4 1 4 7.98 31.920 1.208 38.56
93 14 8 1 8 7.54 60.320 1.208 72.87
94 14 3 1 3 8.11 24.330 1.208 29.39
95 20 3 1 3 8.44 25.320 2.466 62.44
96 20 3 1 3 4.44 13.320 2.466 32.85
97 14 30 1 30 2.33 69.900 1.208 84.44
98 10 425 1 425 1.06 450.500 0.617 277.96
99 12 36 1 36 1.12 40.320 0.888 35.80
100 12 2 1 2 7.29 14.580 0.888 12.95
101 12 36 1 36 1.32 47.520 0.888 42.20
102 12 2 1 2 7.28 14.560 0.888 12.93
ajouter 10 51 2 102 1.24 126.480 0.617 78.038
ajouter 10 2 2 4 7.28 29.120 0.617 17.967
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
54 25 23 1 23 0.80 18.40 3.854 70.91
PLAN DE FERRAILLAGE : OA3 - Aciers rond lisses MUR FRONT CULEEC1 et CULEEC2 70.91
TOTAL 1 UNITE
Page 30/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : OA3 POUTRES CENTRALE N° PLAN : PE-BOU-B-F109
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.00 36.000 6.313 227.27
2 32 3 1 3 12.00 36.000 6.313 227.27
3 32 3 1 3 5.50 16.500 6.313 104.16
4 32 2 1 2 9.50 19.000 6.313 119.95
5 32 2 1 2 12.00 24.000 6.313 151.51
6 32 2 1 2 8.00 16.000 6.313 101.01
7 32 3 1 3 6.00 18.000 6.313 113.63
8 32 3 1 3 12.00 36.000 6.313 227.27
9 32 3 1 3 9.44 28.320 6.313 178.78
10 32 2 1 2 3.44 6.880 6.313 43.43
11 32 2 1 2 12.00 24.000 6.313 151.51
12 32 2 1 2 12.00 24.000 6.313 151.51
13 32 3 1 3 10.99 32.970 6.313 208.14
14 32 3 1 3 12.00 36.000 6.313 227.27
15 32 2 1 2 6.00 12.000 6.313 75.76
16 32 2 1 2 12.00 24.000 6.313 151.51
17 32 2 1 2 6.24 12.480 6.313 78.79
18 32 3 1 3 12.00 36.000 6.313 227.27
19 32 3 2 6 7.25 43.500 6.313 274.62
20 32 2 1 2 7.25 14.500 6.313 91.54
21 32 2 1 2 12.00 24.000 6.313 151.51
22 32 3 1 3 2.29 6.870 6.313 43.37
23 32 3 1 3 12.00 36.000 6.313 227.27
24 32 2 1 2 12.00 24.000 6.313 151.51
25 32 2 1 2 2.29 4.580 6.313 28.91
28a 10 5 2 10 12.00 120.000 0.617 74.04
28b 10 5 2 10 12.00 120.000 0.617 74.04
28c 10 5 2 10 3.07 30.700 0.617 18.94
29a 10 11 1 11 12.01 132.110 0.617 81.51
29b 10 11 1 11 12.00 132.000 0.617 81.44
29c 10 11 1 11 2.80 30.800 0.617 19.00
30a 32 6 1 6 12.00 72.000 6.313 454.54
30b 32 3 1 3 5.14 15.420 6.313 97.35
31 10 142 1 142 4.13 586.460 0.617 361.85
32 10 142 1 142 3.50 497.000 0.617 306.65
33 10 142 1 142 1.92 272.640 0.617 168.22
34 10 142 1 142 3.45 489.900 0.617 302.27
35 10 142 1 142 1.14 161.880 0.617 99.88
36 10 142 1 142 1.18 167.560 0.617 103.38
37 10 142 4 568 0.54 306.720 0.617 189.25
38 10 74 1 74 0.54 39.960 0.617 24.66
39 10 47 1 47 0.54 25.380 0.617 15.66
40 16 6 2 12 3.27 39.240 1.578 61.92
41 12 4 4 16 3.11 49.760 0.888 44.19
44 25 2 2 4 5.94 23.760 3.854 91.57
45 12 4 2 8 1.65 13.200 0.888 11.72
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.00 36.000 6.313 227.27
2 32 3 1 3 12.00 36.000 6.313 227.27
3 32 3 1 3 5.50 16.500 6.313 104.16
4 32 2 1 2 9.50 19.000 6.313 119.95
5 32 2 1 2 12.00 24.000 6.313 151.51
6 32 2 1 2 8.00 16.000 6.313 101.01
7 32 3 1 3 6.00 18.000 6.313 113.63
8 32 3 1 3 12.00 36.000 6.313 227.27
9 32 3 1 3 9.44 28.320 6.313 178.78
10 32 2 1 2 3.44 6.880 6.313 43.43
11 32 2 1 2 12.00 24.000 6.313 151.51
12 32 2 1 2 12.00 24.000 6.313 151.51
13 32 3 1 3 10.99 32.970 6.313 208.14
14 32 3 1 3 12.00 36.000 6.313 227.27
15 32 2 1 2 6.00 12.000 6.313 75.76
16 32 2 1 2 12.00 24.000 6.313 151.51
17 32 2 1 2 6.24 12.480 6.313 78.79
18 32 3 1 3 12.00 36.000 6.313 227.27
19 32 3 2 6 7.25 43.500 6.313 274.62
20 32 2 1 2 7.25 14.500 6.313 91.54
21 32 2 1 2 12.00 24.000 6.313 151.51
22 32 3 1 3 2.29 6.870 6.313 43.37
23 32 3 1 3 12.00 36.000 6.313 227.27
24 32 2 1 2 12.00 24.000 6.313 151.51
25 32 2 1 2 2.29 4.580 6.313 28.91
28a 10 5 2 10 12.00 120.000 0.617 74.04
28b 10 5 2 10 12.00 120.000 0.617 74.04
28c 10 5 2 10 3.07 30.700 0.617 18.94
Page 31/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
29a 10 11 1 11 12.01 132.110 0.617 81.51
29b 10 11 1 11 12.00 132.000 0.617 81.44
29c 10 11 1 11 2.80 30.800 0.617 19.00
30a 32 6 1 6 12.00 72.000 6.313 454.54
30b 32 3 1 3 5.14 15.420 6.313 97.35
31 10 142 1 142 4.13 586.460 0.617 361.85
32 10 142 1 142 3.50 497.000 0.617 306.65
33 10 142 1 142 1.92 272.640 0.617 168.22
34 10 142 1 142 3.45 489.900 0.617 302.27
35 10 142 1 142 1.14 161.880 0.617 99.88
36 10 142 1 142 1.18 167.560 0.617 103.38
37 10 142 4 568 0.54 306.720 0.617 189.25
38 10 74 1 74 0.54 39.960 0.617 24.66
39 10 47 1 47 0.54 25.380 0.617 15.66
40 16 6 2 12 2.07 24.840 1.578 39.20
41 12 4 4 16 1.92 30.720 0.888 27.28
44 25 2 2 4 5.94 23.760 3.854 91.57
45 12 4 2 8 1.65 13.200 0.888 11.72
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 53 1 53 1.000 53.000 0.617 32.70
10 53 1 53 1.250 66.250 0.617 40.88
10 14 1 14 10.500 147.000 0.617 90.70
10 44 1 44 1.000 44.000 0.617 27.15
10 44 1 44 1.060 46.640 0.617 28.78
10 14 1 14 8.500 119.000 0.617 73.42
Page 32/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 52 1 52 7.960 413.920 6.313 2 613.08
2 25 26 1 26 7.750 201.500 3.854 776.58
3 20 26 1 26 7.580 197.080 2.466 486.00
4 32 52 1 52 7.960 413.920 6.313 2 613.08
5 25 26 1 26 7.750 201.500 3.854 776.58
6 20 26 1 26 7.580 197.080 2.466 486.00
7 16 52 2 104 3.215 334.360 1.578 527.62
8 16 52 2 104 3.145 327.080 1.578 516.13
9 16 8 2 16 6.875 110.000 1.578 173.58
10 16 8 2 16 8.375 134.000 1.578 211.45
11 10 676 1 676 3.880 2 622.880 0.617 1 618.32
12 32 20 1 20 6.440 128.800 6.313 813.11
13 32 20 1 20 4.840 96.800 6.313 611.10
14 32 20 1 20 12.000 240.000 6.313 1 515.12
15a 32 20 1 20 12.000 240.000 6.313 1 515.12
15b 32 20 1 20 3.200 64.000 6.313 404.03
16 25 20 1 20 5.750 115.000 3.854 443.21
17 25 20 1 20 4.500 90.000 3.854 346.86
18 25 20 1 20 10.420 208.400 3.854 803.17
19 25 20 1 20 11.670 233.400 3.854 899.52
20 25 40 1 40 3.180 127.200 3.854 490.23
21 16 83 1 83 8.690 721.270 1.578 1 138.16
22 16 78 1 78 7.220 563.160 1.578 888.67
23 16 5 1 5 7.600 38.000 1.578 59.96
24 12 1 560 1 1 560 1.180 1 840.800 0.888 1 634.63
25 16 10 1 10 1.930 19.300 1.578 30.46
26 16 10 1 10 1.930 19.300 1.578 30.46
27 10 10 1 10 1.990 19.900 0.617 12.28
28 10 10 1 10 1.990 19.900 0.617 12.28
29 32 20 1 20 6.320 126.400 6.313 797.96
30a 32 20 1 20 12.000 240.000 6.313 1 515.12
30b 32 20 1 20 2.390 47.800 6.313 301.76
31 32 20 2 40 6.270 250.800 6.313 1 583.30
32a 20 3 2 6 12.000 72.000 2.466 177.55
32b 20 3 2 6 1.790 10.740 2.466 26.48
33 20 9 2 18 8.080 145.440 2.466 358.66
34 20 12 1 12 11.950 143.400 2.466 353.62
35 10 60 1 60 3.310 198.600 0.617 122.54
36 10 12 1 12 8.070 96.840 0.617 59.75
37 10 40 1 40 3.310 132.400 0.617 81.69
38 16 16 1 16 10.820 173.120 1.578 273.18
39 16 24 2 48 9.320 447.360 1.578 705.93
41 16 64 1 64 5.150 329.600 1.578 520.11
42 16 16 1 16 4.350 69.600 1.578 109.83
43 16 24 8 192 3.650 700.800 1.578 1 105.86
44 16 24 2 48 2.840 136.320 1.578 215.11
45 14 3 2 6 4.640 27.840 1.208 33.63
46 10 168 1 168 6.810 1 144.080 0.617 705.90
47 25 5 4 20 5.250 105.000 3.854 404.67
48 25 11 4 44 3.890 171.160 3.854 659.65
49 14 2 4 8 5.230 41.840 1.208 50.54
50 12 5 10 1.690 0.000 0.888 0.00
51 12 6 10 1.590 0.000 0.888 0.00
52 10 4 32 128 0.800 102.400 0.000 0.00
53 10 1 12 5.020 0.000 0.617 0.00
54 10 1 12 5.030 0.000 0.617 0.00
55 a 32 20 1 20 12.000 240.000 6.313 1 515.12
55 b 32 20 1 20 2.390 47.800 6.313 301.76
Page 33/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 71 1 71 10.840 769.640 6.313 4 858.74
2 32 71 1 71 10.840 769.640 6.313 4 858.74
3 25 71 1 71 10.620 754.020 3.854 2 905.99
4a 32 60 1 60 12.000 720.000 6.313 4 545.36
4b 32 60 1 60 3.410 204.600 6.313 1 291.64
5a 25 60 1 60 12.000 720.000 3.854 2 774.88
5b 25 60 1 60 2.850 171.000 3.854 659.03
6 16 71 2 142 3.210 455.820 1.578 719.28
7 16 60 2 120 3.140 376.800 1.578 594.59
8a 16 6 2 12 12.000 144.000 1.578 227.23
8b 16 6 2 12 1.480 17.760 1.578 28.03
9 16 6 2 12 11.200 134.400 1.578 212.08
10 10 1 020 1 1 020 3.950 4 029.000 0.617 2 485.89
11 32 37 1 37 4.780 176.860 6.313 1 116.52
12 32 38 1 38 6.380 242.440 6.313 1 530.52
13 32 37 1 37 6.880 254.560 6.313 1 607.04
14 32 38 1 38 5.280 200.640 6.313 1 266.64
15 25 37 1 37 4.060 150.220 3.854 578.95
16 25 38 1 38 5.310 201.780 3.854 777.66
17 25 37 1 37 7.850 290.450 3.854 1 119.39
18 25 38 1 38 6.600 250.800 3.854 966.58
19 25 3 2 6 4.130 24.780 3.854 95.50
20 25 3 2 6 5.390 32.340 3.854 124.64
21 25 3 1 3 6.970 20.910 3.854 80.59
22 25 3 1 3 5.720 17.160 3.854 66.13
23a 16 46 2 92 12.000 1 104.000 1.578 1 742.11
23b 16 46 2 92 1.550 142.600 1.578 225.02
24 16 46 2 92 2.700 248.400 1.578 391.98
25 10 1058 1 1 058 3.290 3 480.820 0.617 2 147.67
26 10 46 1 46 3.090 142.140 0.617 87.70
27 10 46 1 46 3.110 143.060 0.617 88.27
28a 25 6 1 6 12.00 72.000 3.854 277.49
28b 25 6 1 6 4.31 25.860 3.854 99.66
29a 25 3 1 3 12.00 36.000 3.854 138.74
29b 25 3 1 3 2.89 8.670 3.854 33.41
30a 12 6 1 6 12.00 72.000 0.888 63.94
30b 12 6 1 6 1.77 10.620 0.888 9.43
31 16 75 1 75 1.50 112.500 1.578 177.53
32 16 75 1 75 2.52 189.000 1.578 298.24
33 14 75 1 75 0.90 67.500 1.208 81.54
34a 14 12 1 12 12.00 144.000 1.208 173.95
34b 14 12 1 12 2.52 30.240 1.208 36.53
35a 14 12 1 12 12.00 144.000 1.208 173.95
35b 14 12 1 12 1.63 19.560 1.208 23.63
36 16 92 1 92 2.52 231.840 1.578 365.84
37 12 92 1 92 2.82 259.440 0.888 230.38
38 10 270 1 270 0.75 202.500 0.617 124.94
39 25 5 2 10 4.78 47.800 3.854 184.22
40 25 11 2 22 3.34 73.480 3.854 283.19
41 14 2 2 4 5.23 20.920 1.208 25.27
42 12 5 5 25 1.68 42.000 0.888 0.00
43 12 6 5 30 1.58 47.400 0.888 0.00
44 10 1 6 6 5.27 31.620 0.617 0.00
45 10 1 6 6 5.29 31.740 0.617 0.00
46 10 4 16 64 0.73 46.720 0.000 0.00
47 12 3 1 3 11.60 34.800 0.888 30.90
48 20 3 1 3 11.90 35.700 2.466 88.04
49 8 46 1 46 1.71 78.660 0.395 31.07
50 10 13 1 13 11.56 150.280 0.617 92.72
51 10 27 1 27 11.56 312.120 0.617 192.58
52 10 35 1 35 4.82 168.700 0.617 104.09
53 20 75 1 75 4.86 364.500 2.466 898.86
55 14 10 1 10 3.20 32.000 1.208 38.66
56 14 2 1 2 1.89 3.780 1.208 4.57
57 25 18 1 18 5.400 97.200 3.854 374.61
58 25 18 1 18 4.150 74.700 3.854 287.89
59 20 18 1 18 8.07 145.260 2.466 358.21
60 20 18 1 18 9.32 167.760 2.466 413.70
61 16 18 1 18 4.100 73.800 1.578 116.46
62 16 18 1 18 3.300 59.400 1.578 93.73
63 14 18 1 18 8.55 153.900 1.208 185.91
64 14 18 1 18 9.35 168.300 1.208 203.31
65 20 32 1 32 7.76 248.320 2.466 612.36
66 14 32 1 32 7.28 232.960 1.208 281.42
67 25 3 1 3 8.46 25.380 3.854 97.81
68 25 11 1 11 8.40 92.400 3.854 356.11
69 25 2 1 2 9.06 18.120 3.854 69.83
70 14 3 1 3 7.75 23.250 1.208 28.09
71 14 11 1 11 7.50 82.500 1.208 99.66
72 14 2 1 2 8.11 16.220 1.208 19.59
73 20 3 1 3 8.60 25.800 2.466 63.62
74 20 3 1 3 4.56 13.680 2.466 33.73
75 14 30 1 30 2.32 69.600 1.208 84.08
76 10 423 1 423 1.06 448.380 0.617 276.65
77 14 10 1 10 2.54 25.400 1.208 30.68
78 14 2 1 2 2.06 4.120 1.208 4.98
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
Page 34/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
M.AZAMI A .TARMIDI H. ARAB
Page 35/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
79 25 17 1 17 5.400 91.800 3.854 353.80
80 25 17 1 17 4.150 70.550 3.854 271.90
81 20 17 1 17 7.89 134.130 2.466 330.76
82 20 17 1 17 9.15 155.550 2.466 383.59
83 16 18 1 18 4.100 73.800 1.578 116.46
84 16 18 1 18 3.300 59.400 1.578 93.73
85 14 18 1 18 8.38 150.840 1.208 182.21
86 14 18 1 18 9.18 165.240 1.208 199.61
87 20 31 1 31 7.24 224.440 2.466 553.47
88 14 31 1 31 7.22 223.820 1.208 270.37
89 25 4 1 4 7.38 29.520 3.854 113.77
90 25 9 1 9 7.64 68.760 3.854 265.00
91 25 2 1 2 8.29 16.580 3.854 63.90
92 14 4 1 4 7.16 28.640 1.208 34.60
93 14 9 1 9 7.44 66.960 1.208 80.89
94 14 2 1 2 8.09 16.180 1.208 19.55
95 20 3 1 3 8.43 25.290 2.466 62.37
96 20 3 1 3 4.44 13.320 2.466 32.85
97 14 30 1 30 2.32 69.600 1.208 84.08
98 10 430 1 430 1.06 455.800 0.617 281.23
99 12 36 1 36 1.32 47.520 0.888 42.20
100 12 2 1 2 7.28 0.000 0.888 0.00
102 12 2 1 2 7.28 0.000 0.888 0.00
ajouter 10 51 2 102 1.24 126.480 0.617 78.038
ajouter 10 2 2 4 7.28 29.120 0.617 17.967
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 71 1 71 10.840 769.640 6.313 4 858.74
2 32 71 1 71 10.840 769.640 6.313 4 858.74
3 25 71 1 71 10.620 754.020 3.854 2 905.99
4a 32 60 1 60 12.000 720.000 6.313 4 545.36
4b 32 60 1 60 3.410 204.600 6.313 1 291.64
5a 25 60 1 60 12.000 720.000 3.854 2 774.88
5b 25 60 1 60 2.850 171.000 3.854 659.03
6 16 71 2 142 3.210 455.820 1.578 719.28
7 16 60 2 120 3.140 376.800 1.578 594.59
8a 16 6 2 12 12.000 144.000 1.578 227.23
8b 16 6 2 12 1.480 17.760 1.578 28.03
9 16 6 2 12 11.200 134.400 1.578 212.08
10 10 1 020 1 1 020 3.950 4 029.000 0.617 2 485.89
11 32 37 1 37 4.780 176.860 6.313 1 116.52
12 32 38 1 38 6.380 242.440 6.313 1 530.52
13 32 37 1 37 6.880 254.560 6.313 1 607.04
14 32 38 1 38 5.280 200.640 6.313 1 266.64
15 25 37 1 37 4.060 150.220 3.854 578.95
16 25 38 1 38 5.310 201.780 3.854 777.66
17 25 37 1 37 7.850 290.450 3.854 1 119.39
18 25 38 1 38 6.600 250.800 3.854 966.58
19 25 3 2 6 4.130 24.780 3.854 95.50
20 25 3 2 6 5.390 32.340 3.854 124.64
21 25 3 1 3 6.970 20.910 3.854 80.59
22 25 3 1 3 5.720 17.160 3.854 66.13
23a 16 46 2 92 12.000 1 104.000 1.578 1 742.11
23b 16 46 2 92 1.550 142.600 1.578 225.02
24 16 46 2 92 2.700 248.400 1.578 391.98
25 10 1058 1 1 058 3.290 3 480.820 0.617 2 147.67
26 10 46 1 46 3.090 142.140 0.617 87.70
27 10 46 1 46 3.110 143.060 0.617 88.27
28a 25 6 1 6 12.00 72.000 3.854 277.49
28b 25 6 1 6 4.31 25.860 3.854 99.66
29a 25 3 1 3 12.00 36.000 3.854 138.74
29b 25 3 1 3 2.89 8.670 3.854 33.41
30a 12 6 1 6 12.00 72.000 0.888 63.94
30b 12 6 1 6 1.77 10.620 0.888 9.43
31 16 75 1 75 1.50 112.500 1.578 177.53
32 16 75 1 75 2.52 189.000 1.578 298.24
33 14 75 1 75 0.90 67.500 1.208 81.54
34a 14 13 1 13 12.00 156.000 1.208 188.45
34b 14 13 1 13 2.52 32.760 1.208 39.57
35a 14 13 1 13 12.00 156.000 1.208 188.45
35b 14 13 1 13 1.63 21.190 1.208 25.60
36 16 92 1 92 2.52 231.840 1.578 365.84
37 12 92 1 92 2.77 254.840 0.888 226.30
38 10 315 1 315 0.75 236.250 0.617 145.77
39 25 5 2 10 4.78 47.800 3.854 184.22
40 25 11 2 22 3.34 73.480 3.854 283.19
41 14 2 2 4 5.23 20.920 1.208 25.27
42 12 5 5 25 1.68 42.000 0.888 0.00
43 12 6 5 30 1.58 47.400 0.888 0.00
44 10 1 6 6 5.27 31.620 0.617 0.00
45 10 1 6 6 5.29 31.740 0.617 0.00
46 10 4 16 64 0.73 46.720 0.000 0.00
47 12 3 1 3 11.90 35.700 0.888 31.70
48 20 3 1 3 11.60 34.800 2.466 85.82
49 8 46 1 46 1.71 78.660 0.395 31.07
50 10 13 1 13 11.56 150.280 0.617 92.72
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
Page 36/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
M.AZAMI A .TARMIDI H. ARAB
Page 37/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
51 10 27 1 27 11.56 312.120 0.617 192.58
52 10 35 1 35 4.82 168.700 0.617 104.09
53 20 75 1 75 4.86 364.500 2.466 898.86
55 14 10 1 10 2.54 25.400 1.208 30.68
56 14 2 1 2 1.89 3.780 1.208 4.57
57 25 17 1 17 5.400 91.800 3.854 353.80
58 25 17 1 17 4.150 70.550 3.854 271.90
59 20 17 1 17 8.29 140.930 2.466 347.53
60 20 17 1 17 9.55 162.350 2.466 400.36
61 16 18 1 18 4.100 73.800 1.578 116.46
62 16 18 1 18 3.300 59.400 1.578 93.73
63 14 18 1 18 8.78 158.040 1.208 190.91
64 14 18 1 18 9.58 172.440 1.208 208.31
65 20 33 1 33 7.24 238.920 2.466 589.18
66 14 33 1 33 7.22 238.260 1.208 287.82
67 25 2 1 2 7.91 15.820 3.854 60.97
68 25 12 1 12 7.63 91.560 3.854 352.87
69 25 2 1 2 8.29 16.580 3.854 63.90
70 14 2 1 2 7.69 15.380 1.208 18.58
71 14 12 1 12 7.43 89.160 1.208 107.71
72 14 2 1 2 8.09 16.180 1.208 19.55
73 20 3 1 3 8.60 25.800 2.466 63.62
74 20 3 1 3 4.56 13.680 2.466 33.73
75 14 30 1 30 2.32 69.600 1.208 84.08
76 10 423 1 423 1.06 448.380 0.617 276.65
77 14 10 1 10 2.54 25.400 1.208 30.68
78 14 2 1 2 2.06 4.120 1.208 4.98
79 25 18 1 18 5.400 97.200 3.854 374.61
80 25 18 1 18 4.150 74.700 3.854 287.89
81 20 18 1 18 7.89 142.020 2.466 350.22
82 20 18 1 18 9.15 164.700 2.466 406.15
83 16 18 1 18 4.100 73.800 1.578 116.46
84 16 18 1 18 3.300 59.400 1.578 93.73
85 14 18 1 18 8.38 150.840 1.208 182.21
86 14 18 1 18 9.18 165.240 1.208 199.61
87 20 31 1 31 7.76 240.560 2.466 593.22
88 14 31 1 31 7.28 225.680 1.208 272.62
89 25 4 1 4 8.37 33.480 3.854 129.03
90 25 9 1 9 8.22 73.980 3.854 285.12
91 25 2 1 2 9.06 18.120 3.854 69.83
92 14 4 1 4 7.66 30.640 1.208 37.01
93 14 9 1 9 7.32 65.880 1.208 79.58
94 14 2 1 2 8.11 16.220 1.208 19.59
95 20 3 1 3 8.43 25.290 2.466 62.37
96 20 3 1 3 4.44 13.320 2.466 32.85
97 14 30 1 30 2.32 69.600 1.208 84.08
98 10 440 1 440 1.06 466.400 0.617 287.77
101 12 36 1 36 1.32 47.520 0.888 42.20
ajouter 36 12 46 1 46 0.72 33.120 0.888 29.41
ajouter 35 12 2 1 2 6.43 12.860 0.888 11.419
ajouter 10 51 2 102 1.24 126.480 0.617 78.038
ajouter 10 2 2 4 7.28 29.120 0.617 17.967
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 71 1 71 10.840 769.640 6.313 4 858.74
2 32 71 1 71 10.840 769.640 6.313 4 858.74
3 25 71 1 71 10.620 754.020 3.854 2 905.99
4a 32 60 1 60 12.000 720.000 6.313 4 545.36
4b 32 60 1 60 3.410 204.600 6.313 1 291.64
5a 25 60 1 60 12.000 720.000 3.854 2 774.88
5b 25 60 1 60 2.850 171.000 3.854 659.03
6 16 71 2 142 3.210 455.820 1.578 719.28
7 16 60 2 120 3.140 376.800 1.578 594.59
8a 16 6 2 12 12.000 144.000 1.578 227.23
8b 16 6 2 12 1.480 17.760 1.578 28.03
9 16 6 2 12 11.200 134.400 1.578 212.08
10 10 1 020 1 1 020 3.950 4 029.000 0.617 2 485.89
11 32 37 1 37 4.780 176.860 6.313 1 116.52
12 32 38 1 38 6.380 242.440 6.313 1 530.52
13 32 37 1 37 6.880 254.560 6.313 1 607.04
14 32 38 1 38 5.280 200.640 6.313 1 266.64
15 25 37 1 37 4.060 150.220 3.854 578.95
16 25 38 1 38 5.310 201.780 3.854 777.66
17 25 37 1 37 7.850 290.450 3.854 1 119.39
18 25 38 1 38 6.600 250.800 3.854 966.58
19 25 3 2 6 4.130 24.780 3.854 95.50
20 25 3 2 6 5.390 32.340 3.854 124.64
21 25 3 1 3 6.970 20.910 3.854 80.59
22 25 3 1 3 5.720 17.160 3.854 66.13
23a 16 46 2 92 12.000 1 104.000 1.578 1 742.11
23b 16 46 2 92 1.550 142.600 1.578 225.02
24 16 46 2 92 2.700 248.400 1.578 391.98
25 10 1058 1 1 058 3.290 3 480.820 0.617 2 147.67
26 10 46 1 46 3.090 142.140 0.617 87.70
27 10 46 1 46 3.110 143.060 0.617 88.27
28a 25 6 1 6 12.00 72.000 3.854 277.49
28b 25 6 1 6 4.31 25.860 3.854 99.66
Page 38/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
29a 25 3 1 3 12.00 36.000 3.854 138.74
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
M.AZAMI A .TARMIDI H. ARAB
Page 39/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
29b 25 3 1 3 2.89 8.670 3.854 33.41
30a 12 6 1 6 12.00 72.000 0.888 63.94
30b 12 6 1 6 1.77 10.620 0.888 9.43
31 16 75 1 75 1.50 112.500 1.578 177.53
32 16 75 1 75 2.52 189.000 1.578 298.24
33 14 75 1 75 0.90 67.500 1.208 81.54
34a 14 13 1 13 12.00 156.000 1.208 188.45
34b 14 13 1 13 2.52 32.760 1.208 39.57
35a 14 13 1 13 12.00 156.000 1.208 188.45
35b 14 13 1 13 1.63 21.190 1.208 25.60
36 16 92 1 92 2.52 231.840 1.578 365.84
37 12 92 1 92 2.82 259.440 0.888 230.38
38 10 315 1 315 0.75 236.250 0.617 145.77
39 25 5 2 10 4.78 47.800 3.854 184.22
40 25 11 2 22 3.34 73.480 3.854 283.19
41 14 2 2 4 5.23 20.920 1.208 25.27
42 12 5 5 25 1.68 42.000 0.888 0.00
43 12 6 5 30 1.58 47.400 0.888 0.00
44 10 1 6 6 5.27 31.620 0.617 0.00
45 10 1 6 6 5.29 31.740 0.617 0.00
46 10 4 8 32 0.73 23.360 0.000 0.00
47 12 3 1 3 11.60 34.800 0.888 30.90
48 20 3 1 3 11.90 35.700 2.466 88.04
49 8 46 1 46 1.71 78.660 0.395 31.07
50 10 12 1 12 11.56 138.720 0.617 85.59
51 10 27 1 27 11.56 312.120 0.617 192.58
52 10 35 1 35 4.82 168.700 0.617 104.09
53 20 75 1 75 4.86 364.500 2.466 898.86
55 14 12 1 12 2.54 30.480 1.208 36.82
56 14 2 1 2 2.32 4.640 1.208 5.61
57 25 17 1 17 5.400 91.800 3.854 353.80
58 25 17 1 17 4.150 70.550 3.854 271.90
59 20 17 1 17 8.02 136.340 2.466 336.21
60 20 17 1 17 9.27 157.590 2.466 388.62
61 16 18 1 18 4.100 73.800 1.578 116.46
62 16 18 1 18 3.300 59.400 1.578 93.73
63 14 18 1 18 8.50 153.000 1.208 184.82
64 14 18 1 18 9.30 167.400 1.208 202.22
65 20 32 1 32 7.24 231.680 2.466 571.32
66 14 32 1 32 7.22 231.040 1.208 279.10
67 25 3 1 3 6.42 19.260 3.854 74.23
68 25 11 1 11 7.22 79.420 3.854 306.08
69 25 2 1 2 8.29 16.580 3.854 63.90
70 14 3 1 3 6.22 18.660 1.208 22.54
71 14 11 1 11 7.01 77.110 1.208 93.15
72 14 2 1 2 8.09 16.180 1.208 19.55
73 20 3 1 3 8.60 25.800 2.466 63.62
74 20 3 1 3 4.56 13.680 2.466 33.73
75 14 30 1 30 2.27 68.100 1.208 82.26
76 10 444 1 444 1.06 470.640 0.617 290.38
77 14 10 1 10 3.20 32.000 1.208 38.66
78 14 2 1 2 1.92 3.840 1.208 4.64
79 25 18 1 18 5.400 97.200 3.854 374.61
80 25 18 1 18 4.150 74.700 3.854 287.89
81 20 18 1 18 8.42 151.560 2.466 373.75
82 20 18 1 18 9.67 174.060 2.466 429.23
83 16 18 1 18 4.100 73.800 1.578 116.46
84 16 18 1 18 3.300 59.400 1.578 93.73
85 14 18 1 18 8.90 160.200 1.208 193.52
86 14 18 1 18 9.70 174.600 1.208 210.92
87 20 35 1 35 7.76 271.600 2.466 669.77
88 14 35 1 35 7.28 254.800 1.208 307.80
90 25 13 1 13 8.18 106.340 3.854 409.83
91 25 2 1 2 9.06 18.120 3.854 69.83
93 14 13 1 13 7.29 94.770 1.208 114.48
94 14 2 1 2 8.11 16.220 1.208 19.59
95 20 3 1 3 8.43 25.290 2.466 62.37
96 20 3 1 3 4.44 13.320 2.466 32.85
97 14 30 1 30 2.28 68.400 1.208 82.63
98 10 428 1 428 1.06 453.680 0.617 279.92
101 12 36 1 36 1.32 47.520 0.888 42.20
ajouter 36 12 46 1 46 0.72 33.120 0.888 29.41
ajouter 35 12 2 1 2 6.43 12.860 0.888 11.419
ajouter 10 51 2 102 1.24 126.480 0.617 78.038
ajouter 10 2 2 4 7.28 29.120 0.617 17.967
Page 40/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : OA4 - CULEE C2 (OUVRAGE 2 ) N° PLAN : PE-MEL-B-F117 + PE-MEL-B-F118
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 71 1 71 10.840 769.640 6.313 4 858.74
2 32 71 1 71 10.840 769.640 6.313 4 858.74
3 25 71 1 71 10.620 754.020 3.854 2 905.99
4a 32 60 1 60 12.000 720.000 6.313 4 545.36
4b 32 60 1 60 3.410 204.600 6.313 1 291.64
5a 25 60 1 60 12.000 720.000 3.854 2 774.88
5b 25 60 1 60 2.850 171.000 3.854 659.03
6 16 71 2 142 3.210 455.820 1.578 719.28
7 16 60 2 120 3.140 376.800 1.578 594.59
8a 16 6 2 12 12.000 144.000 1.578 227.23
8b 16 6 2 12 1.480 17.760 1.578 28.03
9 16 6 2 12 11.200 134.400 1.578 212.08
10 10 1 020 1 1 020 3.950 4 029.000 0.617 2 485.89
11 32 37 1 37 4.780 176.860 6.313 1 116.52
12 32 38 1 38 6.380 242.440 6.313 1 530.52
13 32 37 1 37 6.880 254.560 6.313 1 607.04
14 32 38 1 38 5.280 200.640 6.313 1 266.64
15 25 37 1 37 4.060 150.220 3.854 578.95
16 25 38 1 38 5.310 201.780 3.854 777.66
17 25 37 1 37 7.850 290.450 3.854 1 119.39
18 25 38 1 38 6.600 250.800 3.854 966.58
19 25 3 2 6 4.130 24.780 3.854 95.50
20 25 3 2 6 5.390 32.340 3.854 124.64
21 25 3 1 3 6.970 20.910 3.854 80.59
22 25 3 1 3 5.720 17.160 3.854 66.13
23a 16 46 2 92 12.000 1 104.000 1.578 1 742.11
23b 16 46 2 92 1.550 142.600 1.578 225.02
24 16 46 2 92 2.700 248.400 1.578 391.98
25 10 1058 1 1 058 3.290 3 480.820 0.617 2 147.67
26 10 46 1 46 3.090 142.140 0.617 87.70
27 10 46 1 46 3.110 143.060 0.617 88.27
28a 25 6 1 6 12.00 72.000 3.854 277.49
28b 25 6 1 6 4.31 25.860 3.854 99.66
29a 25 3 1 3 12.00 36.000 3.854 138.74
29b 25 3 1 3 2.89 8.670 3.854 33.41
30a 12 6 1 6 12.00 72.000 0.888 63.94
30b 12 6 1 6 1.77 10.620 0.888 9.43
31 16 75 1 75 1.50 112.500 1.578 177.53
32 16 75 1 75 2.52 189.000 1.578 298.24
33 14 75 1 75 0.90 67.500 1.208 81.54
34a 14 12 1 12 12.00 144.000 1.208 173.95
34b 14 12 1 12 2.52 30.240 1.208 36.53
35a 14 12 1 12 12.00 144.000 1.208 173.95
35b 14 12 1 12 1.63 19.560 1.208 23.63
36 16 92 1 92 2.52 231.840 1.578 365.84
37 12 92 1 92 2.82 259.440 0.888 230.38
38 10 270 1 270 0.75 202.500 0.617 124.94
39 25 5 2 10 4.78 47.800 3.854 184.22
40 25 11 2 22 3.34 73.480 3.854 283.19
41 14 2 2 4 5.23 20.920 1.208 25.27
42 12 5 5 25 1.68 42.000 0.888 0.00
43 12 6 5 30 1.58 47.400 0.888 0.00
44 10 1 6 6 5.27 31.620 0.617 0.00
45 10 1 6 6 5.29 31.740 0.617 0.00
46 10 4 8 32 0.73 23.360 0.000 0.00
47 12 3 1 3 11.90 35.700 0.888 31.70
48 20 3 1 3 11.60 34.800 2.466 85.82
49 8 46 1 46 1.71 78.660 0.395 31.07
50 10 13 1 13 11.56 150.280 0.617 92.72
51 10 27 1 27 11.56 312.120 0.617 192.58
52 10 35 1 35 4.82 168.700 0.617 104.09
53 20 75 1 75 4.86 364.500 2.466 898.86
55 14 10 1 10 2.54 25.400 1.208 30.68
56 14 2 1 2 1.89 3.780 1.208 4.57
57 25 17 1 17 5.400 91.800 3.854 353.80
58 25 17 1 17 4.150 70.550 3.854 271.90
59 20 17 1 17 8.19 139.230 2.466 343.34
60 20 17 1 17 9.44 160.480 2.466 395.74
61 16 18 1 18 4.100 73.800 1.578 116.46
62 16 18 1 18 3.300 59.400 1.578 93.73
63 14 18 1 18 8.67 156.060 1.208 188.52
64 14 18 1 18 9.47 170.460 1.208 205.92
65 20 33 1 33 7.24 238.920 2.466 589.18
66 14 33 1 33 7.22 238.260 1.208 287.82
67 25 2 1 2 7.81 15.620 3.854 60.20
68 25 12 1 12 7.44 89.280 3.854 344.09
69 25 2 1 2 8.29 16.580 3.854 63.90
70 14 2 1 2 7.58 15.160 1.208 18.31
71 14 12 1 12 7.24 86.880 1.208 104.95
72 14 2 1 2 8.09 16.180 1.208 19.55
73 20 3 1 3 8.60 25.800 2.466 63.62
74 20 3 1 3 4.56 13.680 2.466 33.73
75 14 30 1 30 2.27 68.100 1.208 82.26
76 10 427 1 427 1.06 452.620 0.617 279.27
77 14 10 1 10 3.20 32.000 1.208 38.66
78 14 2 1 2 2.06 4.120 1.208 4.98
79 25 18 1 18 5.400 97.200 3.854 374.61
80 25 18 1 18 4.150 74.700 3.854 287.89
Page 41/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
Etablie et Verifié parAMO Validé par: MOD ACCEPTE PAR L'ENTREPRISE :
M.AZAMI A .TARMIDI H. ARAB
81 20 18 1 18 8.02 144.360 2.466 355.99
82 20 18 1 18 9.27 166.860 2.466 411.48
83 16 18 1 18 4.100 73.800 1.578 116.46
84 16 18 1 18 3.300 59.400 1.578 93.73
85 14 18 1 18 8.50 153.000 1.208 184.82
86 14 18 1 18 9.30 167.400 1.208 202.22
87 20 32 1 32 7.76 248.320 2.466 612.36
88 14 32 1 32 7.28 232.960 1.208 281.42
89 25 3 1 3 8.29 24.870 3.854 95.85
90 25 11 1 11 8.16 89.760 3.854 345.94
91 25 2 1 2 9.06 18.120 3.854 69.83
92 14 3 1 3 7.58 22.740 1.208 27.47
93 14 11 1 11 7.27 79.970 1.208 96.60
94 14 2 1 2 8.11 16.220 1.208 19.59
95 20 3 1 3 8.43 25.290 2.466 62.37
96 20 3 1 3 4.44 13.320 2.466 32.85
97 14 30 1 30 2.28 68.400 1.208 82.63
98 10 434 1 434 1.06 460.040 0.617 283.84
101 12 37 1 37 1.34 49.580 0.888 44.03
ajouter 10 51 2 102 1.24 126.480 0.617 78.038
ajouter 10 2 2 4 7.28 29.120 0.617 17.967
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.000 36.000 6.313 227.27
2 32 3 1 3 12.000 36.000 6.313 227.27
3 32 3 1 3 5.500 16.500 6.313 104.16
4 32 2 1 2 9.500 19.000 6.313 119.95
5 32 2 1 2 12.000 24.000 6.313 151.51
6 32 2 1 2 8.000 16.000 6.313 101.01
7 32 3 1 3 6.000 18.000 6.313 113.63
8 32 3 1 3 12.000 36.000 6.313 227.27
9 32 3 1 3 9.440 28.320 6.313 178.78
10 32 2 1 2 3.440 6.880 6.313 43.43
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 12.000 24.000 6.313 151.51
13 32 3 1 3 10.990 32.970 6.313 208.14
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 2 1 2 6.000 12.000 6.313 75.76
16 32 2 1 2 12.000 24.000 6.313 151.51
17 32 2 1 2 6.240 12.480 6.313 78.79
18 32 3 1 3 12.000 36.000 6.313 227.27
19 32 3 2 6 7.250 43.500 6.313 274.62
20 32 2 1 2 7.250 14.500 6.313 91.54
21 32 2 1 2 12.000 24.000 6.313 151.51
22 32 3 1 3 2.290 6.870 6.313 43.37
23 32 3 1 3 12.000 36.000 6.313 227.27
24 32 2 1 2 12.000 24.000 6.313 151.51
25 32 2 1 2 2.290 4.580 6.313 28.91
28 a 10 5 2 10 12.000 120.000 0.617 74.04
28 b 10 5 2 10 12.000 120.000 0.617 74.04
28 c 10 5 2 10 3.070 30.700 0.617 18.94
29 a 10 11 1 11 12.010 132.110 0.617 81.51
29 b 10 11 1 11 12.000 132.000 0.617 81.44
29 c 10 11 1 11 2.800 30.800 0.617 19.00
30 a 32 6 12.000 0.000 6.313 0.00
30 b 32 3 5.140 0.000 6.313 0.00
31 10 142 1 142 4.130 586.460 0.617 361.85
32 10 142 1 142 3.500 497.000 0.617 306.65
33 10 142 1 142 1.920 272.640 0.617 168.22
34 10 142 1 142 3.450 489.900 0.617 302.27
35 10 142 1 142 1.140 161.880 0.617 99.88
36 10 142 1 142 1.180 167.560 0.617 103.38
37 10 142 4 568 0.540 306.720 0.617 189.25
38 10 74 1 74 0.540 39.960 0.617 24.66
39 10 47 1 47 0.540 25.380 0.617 15.66
44 25 2 2 4 5.940 23.760 3.854 91.57
Page 42/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : POUTRES DE RIVE (OUVRAGE 1 et 2) Aciers rond lisses N° PLAN : PE-MEL-B-F109
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
40 16 6 2 12 2.040 24.480 1.578 38.63
41 12 4 4 16 1.890 30.240 0.888 26.85
42 10 1 2 3.220 0.000 0.617 0.00
43 10 1 2 3.200 0.000 0.617 0.00
TOTAL 1 UNITE PLAN DE FERRAILLAGE : POUTRES DE RIVE (OUVRAGE 1 et 2) Aciers rond lisses 65.48
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 3 1 3 12.000 36.000 6.313 227.27
2 32 3 1 3 12.000 36.000 6.313 227.27
3 32 3 1 3 5.500 16.500 6.313 104.16
4 32 2 1 2 9.500 19.000 6.313 119.95
5 32 2 1 2 12.000 24.000 6.313 151.51
6 32 2 1 2 8.000 16.000 6.313 101.01
7 32 3 1 3 6.000 18.000 6.313 113.63
8 32 3 1 3 12.000 36.000 6.313 227.27
9 32 3 1 3 9.440 28.320 6.313 178.78
10 32 2 1 2 3.440 6.880 6.313 43.43
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 12.000 24.000 6.313 151.51
13 32 3 1 3 10.990 32.970 6.313 208.14
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 2 1 2 6.000 12.000 6.313 75.76
16 32 2 1 2 12.000 24.000 6.313 151.51
17 32 2 1 2 6.240 12.480 6.313 78.79
18 32 3 1 3 12.000 36.000 6.313 227.27
19 32 3 2 6 7.250 43.500 6.313 274.62
20 32 2 1 2 7.250 14.500 6.313 91.54
21 32 2 1 2 12.000 24.000 6.313 151.51
22 32 3 1 3 2.290 6.870 6.313 43.37
23 32 3 1 3 12.000 36.000 6.313 227.27
24 32 2 1 2 12.000 24.000 6.313 151.51
25 32 2 1 2 2.290 4.580 6.313 28.91
28 a 10 5 2 10 12.000 120.000 0.617 74.04
28 b 10 5 2 10 12.000 120.000 0.617 74.04
28 c 10 5 2 10 3.070 30.700 0.617 18.94
29 a 10 11 1 11 12.010 132.110 0.617 81.51
29 b 10 11 1 11 12.000 132.000 0.617 81.44
29 c 10 11 1 11 2.800 30.800 0.617 19.00
31 10 142 1 142 4.130 586.460 0.617 361.85
32 10 142 1 142 3.500 497.000 0.617 306.65
33 10 142 1 142 1.920 272.640 0.617 168.22
34 10 142 1 142 3.450 489.900 0.617 302.27
35 10 142 1 142 1.140 161.880 0.617 99.88
36 10 142 1 142 1.180 167.560 0.617 103.38
37 10 142 4 568 0.540 306.720 0.617 189.25
38 10 74 1 74 0.540 39.960 0.617 24.66
39 10 47 1 47 0.540 25.380 0.617 15.66
44 25 2 2 4 5.940 23.760 3.854 91.57
PLAN DE FERRAILLAGE : POUTRES DE RIVE (OUVRAGE 1 et 2) Aciers rond lisses N° PLAN : PE-MEL-B-F109
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
40 16 6 2 12 3.270 39.240 1.578 61.92
41 12 4 4 16 3.110 49.760 0.888 44.19
TOTAL 1 UNITE PLAN DE FERRAILLAGE : POUTRES DE RIVE (OUVRAGE 1 et 2) Aciers rond lisses 106.10
Page 43/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE :DALLE (OUVRAGE 1 et 2) N° PLAN : PE-MEL-B-F110
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 5 168 840 1.600 1 344.000 0.617 829.25
2 8 8 168 1 344 1.060 1 424.640 0.395 562.73
3 10 5 8 40 1.600 64.000 0.617 39.49
4 8 8 8 64 0.920 58.880 0.395 23.26
5 10 2 8 16 1.600 25.600 0.617 15.80
6 8 8 8 64 0.220 14.080 0.395 5.56
7 10 3 4 12 1.600 19.200 0.617 11.85
8 8 8 4 32 0.590 18.880 0.395 7.46
10a 20 253 1 253 12.070 3 053.710 2.466 7 530.45
10b 20 253 1 253 1.650 417.450 2.466 1 029.43
11a 20 253 1 253 11.590 2 932.270 2.466 7 230.98
11b 20 253 1 253 2.100 531.300 2.466 1 310.19
12a 14 76 2 152 12.000 1 824.000 1.208 2 203.39
12b 14 76 2 152 12.030 1 828.560 1.208 2 208.90
12c 14 76 2 152 2.650 402.800 1.208 486.58
13a 14 76 2 152 12.000 1 824.000 1.208 2 203.39
13b 14 76 2 152 12.030 1 828.560 1.208 2 208.90
13c 14 76 2 152 2.650 402.800 1.208 486.58
14 14 77 1 77 2.040 157.080 1.208 189.75
15 14 77 1 77 2.040 157.080 1.208 189.75
16 12 77 2 154 1.680 258.720 0.888 229.74
17 20 88 1 88 5.100 448.800 2.466 1 106.74
18 16 88 1 88 5.100 448.800 1.578 708.21
20a 25 4 4 16 12.000 192.000 3.854 739.97
20b 25 4 4 16 2.050 32.800 3.854 126.41
21 14 5 8 40 2.960 118.400 1.208 143.03
22 14 5 8 40 2.600 104.000 1.208 125.63
23 10 10 8 80 0.540 43.200 0.617 26.65
24 12 261 1 261 1.310 341.910 0.888 303.62
25a 12 8 1 8 12.000 96.000 0.888 85.25
25b 12 2 1 2 5.920 11.840 0.888 10.51
27 14 5 8 40 3.330 133.200 1.208 160.91
28 14 5 8 40 2.970 118.800 1.208 143.51
29 10 10 8 80 0.540 43.200 0.617 26.65
30 12 261 1 261 1.110 289.710 0.888 257.26
31a 12 8 1 8 12.000 96.000 0.888 85.25
31b 12 2 1 2 5.920 11.840 0.888 10.51
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
9 8 2 188 376 0.580 218.080 0.395 86.14
26 10 1 64 64 1.280 81.920 0.000 0.00
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 53 1 53 1.000 53.000 0.617 32.70
10 53 1 53 1.250 66.250 0.617 40.88
10 14 1 14 10.500 147.000 0.617 90.70
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
6 7 1 7 0.550 3.850 0.222 0.85
6 4 1 4 1.190 4.760 0.222 1.06
Page 44/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 79 1 79 4.960 391.840 6.313 2 473.69
2 32 40 1 40 4.960 198.400 6.313 1 252.50
3 25 39 1 39 4.750 185.250 3.854 713.95
4a 25 27 1 27 12.000 324.000 3.854 1 248.70
4b 25 27 1 27 2.000 54.000 3.854 208.12
5a 25 27 1 27 12.000 324.000 3.854 1 248.70
5b 25 27 1 27 2.000 54.000 3.854 208.12
6 16 79 2 158 2.610 412.380 1.578 650.74
7 16 27 2 54 2.540 137.160 1.578 216.44
8 16 5 2 10 11.900 119.000 1.578 187.78
9 16 5 2 10 5.410 54.100 1.578 85.37
10 10 507 1 507 2.700 1 368.900 0.617 844.61
11 32 10 4 40 3.220 128.800 6.313 813.11
12 32 10 4 40 4.820 192.800 6.313 1 217.15
13 32 10 4 40 5.360 214.400 6.313 1 353.51
14 32 10 4 40 3.750 150.000 6.313 946.95
15 20 25 4 100 4.930 493.000 2.466 1 215.74
16a 25 11 1 11 12.00 132.00 3.854 508.73
16b 25 11 1 11 2.93 32.23 3.854 124.21
17a 32 9 1 9 12.00 108.00 6.313 681.80
17b 32 9 1 9 3.49 31.41 6.313 198.29
18a 20 7 2 14 12.00 168.00 2.466 414.29
18b 20 7 2 14 3.52 49.28 2.466 121.52
19a 12 2 1 2 12.00 24.00 0.888 21.31
19b 12 2 1 2 1.81 3.62 0.888 3.21
20 12 11 2 22 2.05 45.10 0.888 40.05
21 14 86 1 86 5.69 489.34 1.208 591.12
22 12 86 1 86 0.80 68.80 0.888 61.09
23 10 86 8 688 2.10 1,444.80 0.617 891.44
24 10 43 3 129 3.65 470.85 0.617 290.51
25 16 92 1 92 3.86 355.12 1.578 560.38
26 12 92 1 92 3.87 356.04 0.888 316.16
27a 12 17 1 17 12.00 204.00 0.888 181.15
27b 12 17 1 17 1.64 27.88 0.888 24.76
28a 12 17 1 17 12.00 204.00 0.888 181.15
28b 12 17 1 17 2.35 39.95 0.888 35.48
29 12 2 1 2 7.27 14.54 0.888 12.91
30 12 2 1 2 7.29 14.58 0.888 12.95
31 10 352 1 352 0.76 267.52 0.617 165.06
32a 25 3 1 3 12.00 36.00 3.854 138.74
32b 25 3 1 3 2.92 8.76 3.854 33.76
33a 10 4 1 4 12.00 48.00 0.617 29.62
33b 10 4 1 4 1.66 6.64 0.617 4.10
34 12 87 1 87 2.21 192.27 0.888 170.74
35 12 1 1 1 2.34 2.34 0.888 2.08
36 14 17 1 17 2.15 36.55 1.208 44.15
37 14 2 1 2 3.69 7.38 1.208 8.92
38 16 4 1 4 6.56 26.24 1.578 41.41
39 16 5 1 5 5.97 29.85 1.578 47.10
40 14 9 1 9 4.51 40.59 1.208 49.03
41 14 4 1 4 2.65 10.60 1.208 12.80
42 12 5 1 5 4.43 22.15 0.888 19.67
43 12 14 1 14 2.46 34.44 0.888 30.58
44 12 21 2 42 2.66 111.72 0.888 99.21
45 20 5 1 5 8.48 42.40 2.466 104.56
46 12 5 1 5 7.45 37.25 0.888 33.08
47 10 47 1 47 0.89 41.83 0.617 25.81
48 12 22 1 22 1.56 34.32 0.888 30.48
49 12 21 1 21 2.10 44.10 0.888 39.16
50 12 4 1 4 4.52 18.08 0.888 16.06
51 12 2 1 2 4.48 8.96 0.888 7.96
52 25 15 1 15 3.19 47.85 3.854 184.41
53 25 3 1 3 5.47 16.41 3.854 63.24
54 14 3 1 3 6.58 19.74 1.208 23.85
55 12 5 4 20 2.09 41.80 0.888 0.00
56 12 6 4 24 1.98 47.52 0.888 0.00
57 10 1 10 10 5.27 52.70 0.617 0.00
58 10 1 10 10 6.13 61.30 0.617 0.00
59 10 8 4 32 0.79 25.28 0.617 15.60
60a 20 3 1 3 12.00 36.00 2.466 88.78
60 b 20 3 1 3 1.35 4.05 2.466 9.99
61a 12 3 1 3 11.89 35.67 0.888 31.67
61b 12 3 1 3 0.76 2.28 0.888 2.02
62a 10 12 1 12 11.87 142.44 0.617 87.89
62b 10 12 1 12 0.64 7.68 0.617 4.74
63a 14 20 1 20 11.94 238.80 1.208 288.47
63b 14 20 1 20 0.91 18.20 1.208 21.99
64 20 59 1 59 4.67 275.53 2.466 679.46
65 10 36 1 36 4.68 168.48 0.617 103.95
ajout 8 46 1 46 1.71 78.66 0.395 31.07
Page 45/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
M.AZAMI A .TARMIDI H. ARAB
PLAN DE FERRAILLAGE : OA5 - CULEE 1 (OUVRAGE 1) N° PLAN : PE-ISL-B-F107 -- PE-ISL-B-F108
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
66 25 24 1 24 0.800 19.200 3.852 73.96
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 79 1 79 4.960 391.840 6.313 2 473.69
2 32 40 1 40 4.960 198.400 6.313 1 252.50
3 25 39 1 39 4.750 185.250 3.854 713.95
4a 25 27 1 27 12.000 324.000 3.854 1 248.70
4b 25 27 1 27 2.000 54.000 3.854 208.12
5a 25 27 1 27 12.000 324.000 3.854 1 248.70
5b 25 27 1 27 2.000 54.000 3.854 208.12
6 16 79 2 158 2.610 412.380 1.578 650.74
7 16 27 2 54 2.540 137.160 1.578 216.44
8 16 5 2 10 11.900 119.000 1.578 187.78
9 16 5 2 10 5.410 54.100 1.578 85.37
10 10 507 1 507 2.700 1 368.900 0.617 844.61
11 32 10 4 40 3.220 128.800 6.313 813.11
12 32 10 4 40 4.820 192.800 6.313 1 217.15
13 32 10 4 40 5.360 214.400 6.313 1 353.51
14 32 10 4 40 3.750 150.000 6.313 946.95
15 20 25 4 100 4.930 493.000 2.466 1 215.74
16a 25 11 1 11 12.00 132.00 3.854 508.73
16b 25 11 1 11 2.93 32.23 3.854 124.21
17a 32 9 1 9 12.00 108.00 6.313 681.80
17b 32 9 1 9 3.49 31.41 6.313 198.29
18a 20 7 2 14 12.00 168.00 2.466 414.29
18b 20 7 2 14 3.52 49.28 2.466 121.52
19a 12 2 1 2 12.00 24.00 0.888 21.31
19b 12 2 1 2 1.81 3.62 0.888 3.21
20 12 11 2 22 2.05 45.10 0.888 40.05
21 14 86 1 86 5.69 489.34 1.208 591.12
22 12 86 1 86 0.80 68.80 0.888 61.09
23 10 86 8 688 2.09 1,437.92 0.617 887.20
24 10 43 3 129 3.65 470.85 0.617 290.51
25 16 92 1 92 3.82 351.44 1.578 554.57
26 12 92 1 92 3.83 352.36 0.888 312.90
27a 12 17 1 17 12.00 204.00 0.888 181.15
27b 12 17 1 17 1.64 27.88 0.888 24.76
28a 12 17 1 17 12.00 204.00 0.888 181.15
28b 12 17 1 17 2.35 39.95 0.888 35.48
29 12 1 1 1 9.12 9.12 0.888 8.10
30 12 1 1 1 9.06 9.06 0.888 8.05
31 10 352 1 352 0.76 267.52 0.617 165.06
32a 25 3 1 3 12.00 36.00 3.854 138.74
32b 25 3 1 3 2.92 8.76 3.854 33.76
33a 10 4 1 4 12.00 48.00 0.617 29.62
33b 10 4 1 4 1.66 6.64 0.617 4.10
34 12 87 1 87 2.21 192.27 0.888 170.74
35 12 1 1 1 2.34 2.34 0.888 2.08
36 14 17 1 17 3.01 51.17 1.208 61.81
37 14 2 1 2 3.69 7.38 1.208 8.92
38 16 4 1 4 6.56 26.24 1.578 41.41
39 16 5 1 5 6.26 31.30 1.578 49.39
40 14 9 1 9 4.61 41.49 1.208 50.12
41 14 4 1 4 2.71 10.84 1.208 13.09
42 12 5 1 5 4.39 21.95 0.888 19.49
43 12 14 1 14 2.41 33.74 0.888 29.96
44 12 21 2 42 2.66 111.72 0.888 99.21
45 20 5 1 5 8.48 42.40 2.466 104.56
46 12 5 1 5 7.45 37.25 0.888 33.08
47 10 47 1 47 0.89 41.83 0.617 25.81
48 12 22 1 22 1.56 34.32 0.888 30.48
49 12 21 1 21 2.10 44.10 0.888 39.16
50 12 4 1 4 4.52 18.08 0.888 16.06
51 12 2 1 2 4.48 8.96 0.888 7.96
52 25 15 1 15 3.19 47.85 3.854 184.41
53 25 3 1 3 5.47 16.41 3.854 63.24
54 14 3 1 3 6.58 19.74 1.208 23.85
55 12 5 4 20 2.09 41.80 0.888 0.00
56 12 6 4 24 1.98 47.52 0.888 0.00
57 10 1 10 10 5.27 52.70 0.617 0.00
58 10 1 10 10 6.13 61.30 0.617 0.00
59 10 8 4 32 0.79 25.28 0.617 15.60
60a 20 3 1 3 12.00 36.00 2.466 88.78
60 b 20 3 1 3 1.35 4.05 2.466 9.99
61a 12 3 1 3 11.89 35.67 0.888 31.67
61b 12 3 1 3 0.76 2.28 0.888 2.02
62a 10 12 1 12 11.87 142.44 0.617 87.89
62b 10 12 1 12 0.64 7.68 0.617 4.74
63a 14 20 1 20 11.94 238.80 1.208 288.47
63b 14 20 1 20 0.91 18.20 1.208 21.99
64 20 59 1 59 4.67 275.53 2.466 679.46
65 10 36 1 36 4.68 168.48 0.617 103.95
ajout 8 46 1 46 1.71 78.66 0.395 31.07
Page 46/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : OA5 - CULEE 1 (OUVRAGE 2) N° PLAN : PE-ISL-B-F109 -- PE-ISL-B-F110
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
66 25 24 1 24 0.800 19.200 3.852 73.96
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 79 1 79 4.960 391.840 6.313 2 473.69
2 32 40 1 40 4.960 198.400 6.313 1 252.50
3 25 39 1 39 4.750 185.250 3.854 713.95
4a 25 27 1 27 12.000 324.000 3.854 1 248.70
4b 25 27 1 27 2.000 54.000 3.854 208.12
5a 25 27 1 27 12.000 324.000 3.854 1 248.70
5b 25 27 1 27 2.000 54.000 3.854 208.12
6 16 79 2 158 2.610 412.380 1.578 650.74
7 16 27 2 54 2.540 137.160 1.578 216.44
8 16 5 2 10 11.900 119.000 1.578 187.78
9 16 5 2 10 5.410 54.100 1.578 85.37
10 10 507 1 507 2.700 1 368.900 0.617 844.61
11 32 10 4 40 3.220 128.800 6.313 813.11
12 32 10 4 40 4.820 192.800 6.313 1 217.15
13 32 10 4 40 5.360 214.400 6.313 1 353.51
14 32 10 4 40 3.750 150.000 6.313 946.95
15 20 25 4 100 4.930 493.000 2.466 1 215.74
16a 25 11 1 11 12.00 132.00 3.854 508.73
16b 25 11 1 11 2.93 32.23 3.854 124.21
17a 32 9 1 9 12.00 108.00 6.313 681.80
17b 32 9 1 9 3.49 31.41 6.313 198.29
18a 20 7 2 14 12.00 168.00 2.466 414.29
18b 20 7 2 14 3.52 49.28 2.466 121.52
19a 12 2 1 2 12.00 24.00 0.888 21.31
19b 12 2 1 2 1.81 3.62 0.888 3.21
20 12 11 2 22 2.05 45.10 0.888 40.05
21 14 86 1 86 5.69 489.34 1.208 591.12
22 12 86 1 86 0.80 68.80 0.888 61.09
23 10 86 8 688 2.09 1,437.92 0.617 887.20
24 10 43 3 129 3.65 470.85 0.617 290.51
25 16 93 1 93 3.86 358.98 1.578 566.47
26 12 93 1 93 3.87 359.91 0.888 319.60
27a 12 17 1 17 12.00 204.00 0.888 181.15
27b 12 17 1 17 1.64 27.88 0.888 24.76
28a 12 17 1 17 12.00 204.00 0.888 181.15
28b 12 17 1 17 2.35 39.95 0.888 35.48
29 12 2 1 2 7.27 14.54 0.888 12.91
30 12 2 1 2 7.29 14.58 0.888 12.95
31 10 352 1 352 0.76 267.52 0.617 165.06
32a 25 3 1 3 12.00 36.00 3.854 138.74
32b 25 3 1 3 2.92 8.76 3.854 33.76
33a 10 4 1 4 12.00 48.00 0.617 29.62
33b 10 4 1 4 1.66 6.64 0.617 4.10
34 12 87 1 87 2.21 192.27 0.888 170.74
35 12 1 1 1 2.34 2.34 0.888 2.08
36 14 17 1 17 2.15 36.55 1.208 44.15
37 14 2 1 2 3.69 7.38 1.208 8.92
38 16 4 1 4 6.24 24.96 1.578 39.39
39 16 5 1 5 5.97 29.85 1.578 47.10
40 14 9 1 9 4.51 40.59 1.208 49.03
41 14 4 1 4 2.65 10.60 1.208 12.80
42 12 5 1 5 4.43 22.15 0.888 19.67
43 12 14 1 14 2.46 34.44 0.888 30.58
44 12 21 2 42 2.66 111.72 0.888 99.21
45 20 5 1 5 8.48 42.40 2.466 104.56
46 12 5 1 5 7.45 37.25 0.888 33.08
47 10 47 1 47 0.89 41.83 0.617 25.81
48 12 22 1 22 1.56 34.32 0.888 30.48
49 12 21 1 21 2.10 44.10 0.888 39.16
50 12 4 1 4 4.52 18.08 0.888 16.06
51 12 2 1 2 4.48 8.96 0.888 7.96
52 25 15 1 15 3.33 49.95 3.854 192.51
53 25 3 1 3 5.56 16.68 3.854 64.28
54 14 3 1 3 6.58 19.74 1.208 23.85
55 12 5 4 20 2.09 41.80 0.888 0.00
56 12 6 4 24 1.98 47.52 0.888 0.00
57 10 1 10 10 5.27 52.70 0.617 0.00
58 10 1 10 10 6.13 61.30 0.617 0.00
59 10 8 4 32 0.79 25.28 0.617 15.60
60a 20 3 1 3 12.00 36.00 2.466 88.78
60 b 20 3 1 3 1.35 4.05 2.466 9.99
61a 12 3 1 3 11.89 35.67 0.888 31.67
61b 12 3 1 3 0.76 2.28 0.888 2.02
62a 10 12 1 12 11.87 142.44 0.617 87.89
62b 10 12 1 12 0.64 7.68 0.617 4.74
63a 14 20 1 20 11.94 238.80 1.208 288.47
63b 14 20 1 20 0.91 18.20 1.208 21.99
64 20 59 1 59 4.67 275.53 2.466 679.46
65 10 36 1 36 4.68 168.48 0.617 103.95
ajout 8 46 1 46 1.71 78.66 0.395 31.07
Page 47/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : OA5 - CULEE 2 (OUVRAGE1) N° PLAN : PE-ISL-B-F111 -- PE-ISL-B-F112
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
66 25 24 1 24 0.800 19.200 3.852 73.96
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 79 1 79 4.960 391.840 6.313 2 473.69
2 32 40 1 40 4.960 198.400 6.313 1 252.50
3 25 39 1 39 4.750 185.250 3.854 713.95
4a 25 27 1 27 12.000 324.000 3.854 1 248.70
4b 25 27 1 27 2.000 54.000 3.854 208.12
5a 25 27 1 27 12.000 324.000 3.854 1 248.70
5b 25 27 1 27 2.000 54.000 3.854 208.12
6 16 79 2 158 2.610 412.380 1.578 650.74
7 16 27 2 54 2.540 137.160 1.578 216.44
8 16 5 2 10 11.900 119.000 1.578 187.78
9 16 5 2 10 5.410 54.100 1.578 85.37
10 10 507 1 507 2.700 1 368.900 0.617 844.61
11 32 10 4 40 3.220 128.800 6.313 813.11
12 32 10 4 40 4.820 192.800 6.313 1 217.15
13 32 10 4 40 5.360 214.400 6.313 1 353.51
14 32 10 4 40 3.750 150.000 6.313 946.95
15 20 25 4 100 4.930 493.000 2.466 1 215.74
16a 25 11 1 11 12.00 132.00 3.854 508.73
16b 25 11 1 11 2.93 32.23 3.854 124.21
17a 32 9 1 9 12.00 108.00 6.313 681.80
17b 32 9 1 9 3.49 31.41 6.313 198.29
18a 20 7 2 14 12.00 168.00 2.466 414.29
18b 20 7 2 14 3.52 49.28 2.466 121.52
19a 12 2 1 2 12.00 24.00 0.888 21.31
19b 12 2 1 2 1.81 3.62 0.888 3.21
20 12 11 2 22 2.05 45.10 0.888 40.05
21 14 86 1 86 5.69 489.34 1.208 591.12
22 12 86 1 86 0.80 68.80 0.888 61.09
23 10 86 8 688 2.09 1,437.92 0.617 887.20
24 10 43 3 129 3.65 470.85 0.617 290.51
25 16 93 1 93 3.82 355.26 1.578 560.60
26 12 93 1 93 3.83 356.19 0.888 316.30
27a 12 17 1 17 12.00 204.00 0.888 181.15
27b 12 17 1 17 1.64 27.88 0.888 24.76
28a 12 17 1 17 12.00 204.00 0.888 181.15
28b 12 17 1 17 2.35 39.95 0.888 35.48
29 12 1 1 1 9.12 9.12 0.888 8.10
30 12 1 1 1 9.06 9.06 0.888 8.05
31 10 352 1 352 0.76 267.52 0.617 165.06
32a 25 4 1 4 12.00 48.00 3.854 184.99
32b 25 4 1 4 1.66 6.64 3.854 25.59
33a 10 4 1 4 12.00 48.00 0.617 29.62
33b 10 4 1 4 1.66 6.64 0.617 4.10
34 12 87 1 87 2.21 192.27 0.888 170.74
35 12 1 1 1 2.34 2.34 0.888 2.08
36 14 17 1 17 3.01 51.17 1.208 61.81
37 14 2 1 2 3.69 7.38 1.208 8.92
38 16 4 1 4 6.56 26.24 1.578 41.41
39 16 5 1 5 6.26 31.30 1.578 49.39
40 14 9 1 9 4.61 41.49 1.208 50.12
41 14 4 1 4 2.71 10.84 1.208 13.09
42 12 5 1 5 4.39 21.95 0.888 19.49
43 12 14 1 14 2.41 33.74 0.888 29.96
44 12 21 2 42 2.66 111.72 0.888 99.21
45 20 5 1 5 8.48 42.40 2.466 104.56
46 12 5 1 5 7.45 37.25 0.888 33.08
47 10 47 1 47 0.89 41.83 0.617 25.81
48 12 22 1 22 1.56 34.32 0.888 30.48
49 12 21 1 21 2.10 44.10 0.888 39.16
50 12 4 1 4 4.52 18.08 0.888 16.06
51 12 2 1 2 4.48 8.96 0.888 7.96
52 25 15 1 15 3.33 49.95 3.854 192.51
53 25 3 1 3 5.56 16.68 3.854 64.28
54 14 3 1 3 6.58 19.74 1.208 23.85
55 12 5 4 20 2.09 41.80 0.888 0.00
56 12 6 4 24 1.98 47.52 0.888 0.00
57 10 1 10 10 5.27 52.70 0.617 0.00
58 10 1 10 10 6.13 61.30 0.617 0.00
59 10 8 4 32 0.79 25.28 0.000 0.00
60a 20 3 1 3 12.00 36.00 2.466 88.78
60 b 20 3 1 3 1.35 4.05 2.466 9.99
61a 12 3 1 3 11.89 35.67 0.888 31.67
61b 12 3 1 3 0.76 2.28 0.888 2.02
62a 10 12 1 12 11.87 142.44 0.617 87.89
62b 10 12 1 12 0.64 7.68 0.617 4.74
63a 14 20 1 20 11.94 238.80 1.208 288.47
63b 14 20 1 20 0.91 18.20 1.208 21.99
64 20 59 1 59 4.67 275.53 2.466 679.46
65 10 36 1 36 4.68 168.48 0.617 103.95
ajout 8 46 1 46 1.71 78.66 0.395 31.07
Page 48/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : OA5 - CULEE 2 (OUVRAGE2) N° PLAN : PE-ISL-B-F113 -- PE-ISL-B-F114
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
66 25 24 1 24 0.800 19.200 3.852 73.96
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 126 1 126 2.040 257.040 0.596 153.20
1 10 140 1 140 2.100 294.000 0.596 175.22
2 12 230 1 230 2.880 662.400 0.921 610.07
3 12 36 1 36 2.420 87.120 0.921 80.24
4 14 16 1 16 8.780 140.480 1.218 171.10
5 14 16 1 16 12.000 192.000 1.218 233.86
6 10 266 1 266 1.120 297.920 0.596 177.56
7 14 115 1 115 1.520 174.800 1.218 212.91
8 14 36 1 36 0.640 23.040 1.218 28.06
9 10 8 1 8 8.540 68.320 0.596 40.72
10 10 8 1 8 12.000 96.000 0.596 57.22
11 10 28 1 28 10.140 283.920 0.596 169.22
12 10 28 1 28 10.400 291.200 0.596 173.56
13 10 4 1 4 3.440 13.760 0.596 8.20
14 10 4 1 4 10.470 41.880 0.596 24.96
15 10 8 1 8 3.950 31.600 0.596 18.83
16 14 12 1 12 2.700 32.400 1.218 39.46
17 12 24 1 24 8.660 207.840 0.921 191.42
18 12 24 1 24 12.000 288.000 0.921 265.25
19 25 12 1 12 12.000 144.000 3.852 554.69
20 10 4 1 4 8.540 34.160 0.596 20.36
20 Bis 10 4 1 4 12.000 48.000 0.596 28.61
21 14 4 1 4 1.280 5.120 1.218 6.24
22 14 4 1 4 1.000 4.000 1.218 4.87
23 14 4 1 4 1.000 4.000 1.218 4.87
24 14 4 1 4 1.000 4.000 1.218 4.87
25 25 4 1 4 1.000 4.000 3.852 15.41
26 10 12 1 12 1.050 12.600 0.596 7.51
27 10 14 1 14 1.720 24.080 0.596 14.35
28 10 14 1 14 0.440 6.160 0.596 3.67
29 10 266 1 266 1.500 399.000 0.596 237.80
30 10 230 1 230 1.160 266.800 0.596 159.01
31 10 36 1 36 2.150 77.400 0.596 46.13
32 10 100 1 100 1.280 128.000 0.596 76.29
36 14 24 1 24 5.220 125.280 1.218 152.59
37 12 24 1 24 4.740 113.760 0.921 104.77
38 12 12 1 12 5.140 61.680 0.921 56.81
39 12 12 1 12 5.110 61.320 0.921 56.48
40 12 30 1 30 5.050 151.500 0.921 139.53
41 12 12 1 12 5.010 60.120 0.921 55.37
42 12 30 1 30 4.950 148.500 0.921 136.77
43 12 12 1 12 4.920 59.040 0.921 54.38
44 12 14 1 14 4.900 68.600 0.921 63.18
45 10 30 1 30 1.000 30.000 0.596 17.88
46 10 6 1 6 2.140 12.840 0.596 7.65
47 10 28 1 28 0.800 22.400 0.596 13.35
48 10 28 1 28 2.310 64.680 0.596 38.55
49 20 16 1 16 2.770 44.320 2.447 108.45
50 12 32 1 32 2.670 85.440 0.921 78.69
51 10 4 1 4 6.950 27.800 0.596 16.57
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
33 10 16 1 16 2.070 33.120 0.596 19.74
33 Bis 10 16 1 16 1.710 27.360 0.596 16.31
34 8 264 1 264 0.310 81.840 0.390 31.92
35 8 272 1 272 0.390 106.080 0.390 41.37
Page 49/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : POUTRES DE RIVE (OUVRAGE 1 et 2) N° PLAN : PE-MEISL-A-F118
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 126 1 126 2.040 257.040 0.596 153.20
1 10 140 1 140 2.100 294.000 0.596 175.22
2 12 230 1 230 2.880 662.400 0.921 610.07
3 12 36 1 36 2.420 87.120 0.921 80.24
4 14 16 1 16 8.780 140.480 1.218 171.10
5 14 16 1 16 12.000 192.000 1.218 233.86
6 10 266 1 266 1.120 297.920 0.596 177.56
7 14 115 1 115 1.520 174.800 1.218 212.91
8 14 36 1 36 0.640 23.040 1.218 28.06
9 10 8 1 8 8.540 68.320 0.596 40.72
10 10 8 1 8 12.000 96.000 0.596 57.22
11 10 28 1 28 10.140 283.920 0.596 169.22
12 10 28 1 28 10.400 291.200 0.596 173.56
13 10 4 1 4 3.440 13.760 0.596 8.20
14 10 4 1 4 10.470 41.880 0.596 24.96
15 10 8 1 8 3.950 31.600 0.596 18.83
16 14 12 1 12 2.700 32.400 1.218 39.46
17 12 24 1 24 8.660 207.840 0.921 191.42
18 12 24 1 24 12.000 288.000 0.921 265.25
19 25 12 1 12 12.000 144.000 3.852 554.69
20 10 4 1 4 8.540 34.160 0.596 20.36
20 Bis 10 4 1 4 12.000 48.000 0.596 28.61
21 14 4 1 4 1.280 5.120 1.218 6.24
22 14 4 1 4 1.000 4.000 1.218 4.87
23 14 4 1 4 1.000 4.000 1.218 4.87
24 14 4 1 4 1.000 4.000 1.218 4.87
25 25 4 1 4 1.000 4.000 3.852 15.41
26 10 12 1 12 1.050 12.600 0.596 7.51
27 10 14 1 14 1.720 24.080 0.596 14.35
28 10 14 1 14 0.440 6.160 0.596 3.67
29 10 266 1 266 1.500 399.000 0.596 237.80
30 10 230 1 230 1.160 266.800 0.596 159.01
31 10 36 1 36 2.150 77.400 0.596 46.13
32 10 100 1 100 1.280 128.000 0.596 76.29
36 14 24 1 24 5.220 125.280 1.218 152.59
37 12 24 1 24 4.740 113.760 0.921 104.77
38 12 12 1 12 5.140 61.680 0.921 56.81
39 12 12 1 12 5.110 61.320 0.921 56.48
40 12 30 1 30 5.050 151.500 0.921 139.53
41 12 12 1 12 5.010 60.120 0.921 55.37
42 12 30 1 30 4.950 148.500 0.921 136.77
43 12 12 1 12 4.920 59.040 0.921 54.38
44 12 14 1 14 4.900 68.600 0.921 63.18
45 10 30 1 30 1.000 30.000 0.596 17.88
46 10 6 1 6 2.140 12.840 0.596 7.65
47 10 28 1 28 0.800 22.400 0.596 13.35
48 10 28 1 28 2.310 64.680 0.596 38.55
49 20 16 1 16 2.770 44.320 2.447 108.45
50 12 32 1 32 2.670 85.440 0.921 78.69
51 10 4 1 4 6.950 27.800 0.596 16.57
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
33 10 16 1 16 2.070 33.120 0.596 19.74
33 Bis 10 16 1 16 1.710 27.360 0.596 16.31
34 8 264 1 264 0.310 81.840 0.390 31.92
35 8 272 1 272 0.390 106.080 0.390 41.37
Page 50/58
DETAIL DE CALCUL (METRE)
TRAVAUX REALISES AU 04-11-2018
MARCHE N° : AH 24 / 2016
PLAN DE FERRAILLAGE : OA5 - HOURDIS N° PLAN : PE-ISL-B-F118
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 16 66 1 056 5.290 5 586.240 0.617 3 446.71
2 10 16 33 528 5.230 2 761.440 0.617 1 703.81
3 10 20 2 40 5.290 211.600 0.617 130.56
4 10 20 1 20 5.230 104.600 0.617 64.54
5 10 6 4 24 5.290 126.960 0.617 78.33
6 10 6 2 12 5.230 62.760 0.617 38.72
7 10 11 99 1 089 1.060 1 154.340 0.617 712.23
8 10 11 3 33 1.450 47.850 0.617 29.52
9 10 11 6 66 0.370 24.420 0.617 15.07
11 10 44 99 4 356 0.540 2 352.240 0.617 1 451.33
12 10 55 3 165 0.540 89.100 0.617 54.97
13 10 17 6 102 0.540 55.080 0.617 33.98
14a 14 252 1 252 12.000 3 024.000 1.208 3 652.99
14b 14 252 1 252 1.600 403.200 1.208 487.07
15a 14 152 1 152 12.000 1 824.000 1.208 2 203.39
15b 14 76 1 76 12.010 912.760 1.208 1 102.61
15c 14 76 1 76 6.02 457.52 1.208 552.68
16a 14 152 1 152 12.00 1,824.00 1.208 2 203.39
16b 14 76 1 76 12.00 912.00 1.208 1 101.70
16c 14 76 1 76 6.37 484.12 1.208 584.82
17a 12 40 1 40 12.00 480.00 0.888 426.24
17b 12 40 1 40 4.13 165.20 0.888 146.70
12 12 40 2 80 3.49 279.20 0.888 247.93
19 20 8 6 48 2.040 97.92 2.466 241.47
20 12 7 12 84 2.040 171.36 0.888 152.17
21a 32 4 2 8 12.00 96.00 6.313 606.05
21b 32 4 2 8 2.04 16.32 6.313 103.03
22a 25 4 2 8 12.00 96.00 3.854 369.98
22b 25 4 2 8 1.77 14.16 3.854 54.57
23 12 11 6 66 4.710 310.86 0.888 276.04
24 12 11 6 66 4.280 282.48 0.888 250.84
25 10 77 6 462 0.540 249.48 0.617 153.93
26 12 202 1 202 1.57 317.14 0.888 281.62
27a 12 6 4 24 12.00 288.00 0.888 255.74
27b 12 2 4 8 5.65 45.20 0.888 40.14
29 12 202 1 202 1.18 238.36 0.888 211.66
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 10 2 108 216 0.580 125.280 0.617 77.30
28 10 1 16 16 1.28 20.48 0.617 12.64
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
ajoute 14 15 1 15 1.100 16.500 1.208 19.93
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
ajoute 14 25 1 25 1.100 27.500 1.208 33.22
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 53 1 53 1.000 53.000 0.617 32.70
10 53 1 53 1.250 66.250 0.617 40.88
10 14 1 14 10.890 152.460 0.617 94.07
Page 51/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 1 1 1 2.030 2.030 6.313 12.82
2 32 1 1 1 8.500 8.500 6.313 53.66
3 32 1 1 1 12.000 12.000 6.313 75.76
4 32 1 1 1 9.530 9.530 6.313 60.16
5 32 2 1 2 9.530 19.060 6.313 120.33
6 32 2 1 2 12.000 24.000 6.313 151.51
7 32 2 1 2 8.000 16.000 6.313 101.01
8 32 2 1 2 2.530 5.060 6.313 31.94
9 32 2 1 2 2.530 5.060 6.313 31.94
10 32 2 1 2 8.000 16.000 6.313 101.01
11 32 2 1 2 12.000 24.000 6.313 151.51
12 32 2 1 2 9.530 19.060 6.313 120.33
13 32 3 1 3 6.990 20.970 6.313 132.38
14 32 3 1 3 12.000 36.000 6.313 227.27
15 32 3 1 3 9.000 27.000 6.313 170.45
16 32 3 1 3 3.990 11.970 6.313 75.57
17 32 2 1 2 3.990 7.980 6.313 50.38
18 32 2 1 2 8.500 17.000 6.313 107.32
19 32 2 1 2 11.000 22.000 6.313 138.89
20 32 2 1 2 8.490 16.980 6.313 107.19
21 32 3 1 3 5.410 16.230 6.313 102.46
22 32 3 1 3 9.000 27.000 6.313 170.45
23 32 3 1 3 11.500 34.500 6.313 217.80
24 32 3 1 3 5.910 17.730 6.313 111.93
25 32 2 1 2 10.910 21.820 6.313 137.75
26 32 2 1 2 6.500 13.000 6.313 82.07
27 32 2 1 2 9.500 19.000 6.313 119.95
28 32 2 1 2 4.910 9.820 6.313 61.99
29 32 3 1 3 5.500 16.500 6.313 104.16
30 32 3 1 3 10.000 30.000 6.313 189.39
31 32 3 1 3 11.500 34.500 6.313 217.80
32 32 2 2 4 11.000 44.000 6.313 277.77
33 32 2 1 2 6.700 13.400 6.313 84.59
34 32 2 1 2 9.300 18.600 6.313 117.42
35 32 3 1 3 10.850 32.550 6.313 205.49
36 32 3 1 3 11.650 34.950 6.313 220.64
37 32 2 1 2 7.750 15.500 6.313 97.85
38 32 2 1 2 12.000 24.000 6.313 151.51
39 32 2 2 4 2.750 11.000 6.313 69.44
40 32 3 1 3 4.300 12.900 6.313 81.44
41 32 3 1 3 7.700 23.100 6.313 145.83
42 32 3 1 3 6.000 18.000 6.313 113.63
43 32 2 1 2 6.000 12.000 6.313 75.76
44 32 2 1 2 7.700 15.400 6.313 97.22
45 32 2 1 2 4.300 8.600 6.313 54.29
46 32 3 1 3 12.000 36.000 6.313 227.27
47a 10 6 2 12 12.000 144.000 0.617 88.85
47b 10 6 2 12 12.000 144.000 0.617 88.85
47c 10 6 2 12 8.070 96.840 0.617 59.75
48a 10 11 1 11 12.010 132.110 0.617 81.51
48b 10 11 1 11 12.000 132.000 0.617 81.44
48c 10 11 1 11 7.800 85.800 0.617 52.94
49a 32 6 1 6 12.000 72.000 6.313 454.54
49b 32 3 1 3 9.440 28.320 6.313 178.78
50 10 147 2 294 2.550 749.700 0.617 462.56
51 10 147 1 147 4.070 598.290 0.617 369.14
52 10 147 2 294 1.750 514.500 0.617 317.45
53 10 147 1 147 3.260 479.220 0.617 295.68
54 10 147 1 147 1.020 149.940 0.617 92.51
55 10 147 1 147 1.060 155.820 0.617 96.14
56 10 49 5 245 0.390 95.550 0.617 58.95
57 10 15 5 75 0.410 30.750 0.617 18.97
58 10 34 5 170 0.490 83.300 0.617 51.40
59 32 60 1 60 0.540 32.400 6.313 204.54
60 32 45 1 45 0.540 24.300 6.313 153.41
61 32 24 1 24 0.340 8.160 6.313 51.51
62 16 8 2 16 2.030 32.480 1.578 51.25
63 12 5 4 20 1.880 37.600 0.888 33.39
66 25 2 2 4 6.630 26.520 3.854 102.21
67 12 4 2 8 1.650 13.200 0.888 11.72
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 1 1 1 2.030 2.030 6.313 12.82
2 32 1 1 1 8.500 8.500 6.313 53.66
3 32 1 1 1 12.000 12.000 6.313 75.76
4 32 1 1 1 9.530 9.530 6.313 60.16
5 32 2 1 2 9.530 19.060 6.313 120.33
6 32 2 1 2 12.000 24.000 6.313 151.51
7 32 2 1 2 8.000 16.000 6.313 101.01
8 32 2 1 2 2.530 5.060 6.313 31.94
Page 52/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Page 53/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 32 63 2 126 10.660 1 343.160 6.313 8 479.37
2 32 63 1 63 10.660 671.580 6.313 4 239.68
3 32 53 1 53 11.990 635.470 6.313 4 011.72
4 32 53 1 53 11.990 635.470 6.313 4 011.72
5 16 63 2 126 2.910 366.660 1.578 578.59
6 16 53 2 106 2.850 302.100 1.578 476.71
7 16 6 2 12 11.350 136.200 1.578 214.92
8 16 6 2 12 11.110 133.320 1.578 210.38
9 10 793 1 793 3.370 2 672.410 0.617 1 648.88
10 32 38 1 38 3.470 131.860 6.313 832.43
11 32 38 1 38 5.070 192.660 6.313 1 216.26
12 32 38 1 38 7.41 281.58 6.313 1 777.61
13 32 38 1 38 5.81 220.78 6.313 1 393.78
14 25 38 1 38 3.860 146.680 3.854 565.30
15 25 38 1 38 2.610 99.180 3.854 382.24
16 25 38 1 38 6.23 236.74 3.854 912.40
17 25 38 1 38 7.48 284.24 3.854 1 095.46
18 25 5 2 10 3.360 33.600 3.854 129.49
19 25 5 2 10 7.47 74.70 3.854 287.89
20 16 38 1 38 11.39 432.82 1.578 682.99
21 16 37 1 37 11.39 421.43 1.578 665.02
22 16 37 2 74 2.49 184.26 1.578 290.76
23 12 34 23 782 2.85 2,228.70 0.888 1 979.09
24 12 34 2 68 2.54 172.72 0.888 153.38
25 20 76 1 76 2.34 177.84 2.466 438.55
26 16 76 1 76 3.00 228.00 1.578 359.78
27 16 76 1 76 1.00 76.00 1.578 119.93
28a 25 5 1 5 12.00 60.00 3.854 231.24
28b 25 5 1 5 2.89 14.45 3.854 55.69
29 16 6 1 6 11.92 71.52 1.578 112.86
30 10 37 3 111 2.96 328.56 0.617 202.72
31 25 3 1 3 12.00 36.00 3.854 138.74
32 16 88 1 88 3.23 284.24 1.578 448.53
33 12 88 1 88 3.28 288.64 0.888 256.31
34 12 14 1 14 11.39 159.46 0.888 141.60
35a 12 14 1 14 12.00 168.00 0.888 149.18
35b 12 14 1 14 1.64 22.96 0.888 20.39
36 12 2 1 2 6.16 12.32 0.888 10.94
37 12 2 1 2 6.98 13.96 0.888 12.40
38 10 252 1 252 0.70 176.40 0.617 108.84
39 32 20 2 40 4.730 189.200 6.313 1 194.42
40 32 19 2 38 6.330 240.540 6.313 1 518.53
41 25 20 1 20 8.79 175.80 3.854 677.53
42 25 19 1 19 7.19 136.61 3.854 526.49
43 20 20 2 40 4.380 175.200 2.466 432.04
44 20 19 2 38 5.380 204.440 2.466 504.15
45 16 20 1 20 8.23 164.60 1.578 259.74
46 16 19 1 19 7.23 137.37 1.578 216.77
47 25 8 2 16 2.32 37.12 3.854 143.06
48 16 8 2 16 2.40 38.40 1.578 60.60
49 25 50 1 50 7.64 382.00 3.854 1 472.23
50 16 50 1 50 7.64 382.00 1.578 602.80
51 25 9 2 18 8.46 152.28 3.854 586.89
52 16 9 2 18 6.95 125.10 1.578 197.41
53 25 6 2 12 9.11 109.32 3.854 421.32
54 16 6 2 12 7.67 92.04 1.578 145.24
55 16 65 1 65 2.00 130.00 1.578 205.14
56 12 5 1 5 8.37 41.85 0.888 37.16
57 12 5 2 10 3.74 37.40 0.888 33.21
58 25 20 1 20 9.04 180.80 3.854 696.80
59 25 19 1 19 7.44 141.36 3.854 544.80
60 16 20 1 20 8.48 169.60 1.578 267.63
61 16 19 1 19 7.48 142.12 1.578 224.27
62 25 52 1 52 7.64 397.28 3.854 1 531.12
63 16 52 1 52 7.64 397.28 1.578 626.91
64 16 67 1 67 2.00 134.00 1.578 211.45
65 12 5 1 5 8.65 43.25 0.888 38.41
66 20 5 2 10 9.76 97.60 2.466 240.68
67 10 618 1 618 1.16 716.88 0.617 442.31
68 10 626 1 626 1.16 726.16 0.617 448.04
69 12 40 1 40 1.80 72.00 0.888 63.94
70 12 2 2 4 7.94 31.76 0.888 28.20
72 14 14 1 14 2.84 39.76 1.208 48.03
73 14 2 1 2 2.22 4.44 1.208 5.36
74 14 16 1 16 2.84 45.44 1.208 54.89
75 14 2 1 2 2.50 5.00 1.208 6.04
76 25 3 2 6 4.45 26.70 3.854 102.90
77 25 10 2 20 3.06 61.20 3.854 235.86
Page 54/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
PLAN DE FERRAILLAGE : OA6 - Aciers rond lisses MUR FRONT CULEE C2+ CULEEC1 N° PLAN : PE-CHA-B-F112 -PE-CHA-B-F113-PE-CHA-B-F114
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
97 25 21 1 21 0.80 16.80 3.854 64.75
PLAN DE FERRAILLAGE : OA6 - Aciers rond lisses MUR FRONT CULEE C2+ CULE 64.74
TOTAL 1 UNITE
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
1 10 10 232 2320 3.22 7 470.400 0.617 4 609.24
2 10 10 116 1160 0.94 1 090.400 0.617 672.78
3 10 6 8 48 3.28 157.440 0.617 97.14
4 10 10 4 40 0.54 21.600 0.617 13.33
5 10 3 16 48 3.28 157.440 0.617 97.14
6 10 10 8 80 0.24 19.200 0.617 11.85
8 10 6040 1 6040 0.53 3 201.200 0.617 1 975.14
9 20 168 1 168 11.39 1 913.520 2.466 4 718.74
10a 14 64 1 64 12.00 768.000 1.208 927.74
10b 14 64 1 64 12.02 769.280 1.208 929.29
10c 14 64 1 64 8.16 522.240 1.208 630.87
11a 14 64 1 64 12.00 768.000 1.208 927.74
11b 14 64 1 64 12.01 768.640 1.208 928.52
11c 14 64 1 64 8.17 522.880 1.208 631.64
12 16 64 2 128 1.56 199.680 1.578 315.10
12A 12 64 2 128 1.59 203.520 0.888 180.73
13 12 168 2 336 1.30 436.800 0.888 387.88
14 32 4 2 8 11.39 91.120 6.313 575.24
15 12 10 8 80 3.86 308.800 0.888 274.21
16 12 10 8 80 3.51 280.800 0.888 249.35
17 10 30 8 240 0.54 129.600 0.617 79.96
18 12 155 1 155 1.10 170.500 0.888 0.00
19a 12 4 1 4 12.00 48.000 0.888 0.00
19b 12 2 1 2 7.88 15.760 0.888 0.00
20 12 155 1 155 1.46 226.300 0.888 200.95
21a 12 4 1 4 12.00 48.000 0.888 42.62
21b 12 2 1 2 7.88 15.760 0.888 13.99
Page 55/58
Projet : Travaux de réalisation de la voie express Taza- Al Hoceima
Lot n 3 – Section Oued Nekour - Kasseta sur 18 KM Province d’Al Hoceima
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
7 8 2 128 256 0.44 112.640 0.395 44.49
PLAN DE FERRAILLAGE : OA6 - Aciers canal pour 1m² N° PLAN : PE-CHA-B-F112 -PE-CHA-B-F113-PE-CHA-B-F114
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
8 5 1 5 1.00 5.00 0.396 1.98
8 5 1 5 1.00 5.00 0.396 1.98
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 50 1 50 1.000 49.500 0.617 30.54
10 50 1 50 1.060 52.470 0.617 32.37
10 14 1 14 9.700 135.800 0.617 83.79
10 44 1 44 1.000 43.500 0.617 26.84
10 44 1 44 1.060 46.110 0.617 28.45
10 14 1 14 8.500 119.000 0.617 73.42
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 69 1 69 2.960 204.240 0.617 126.02
10 69 1 69 1.760 121.440 0.617 74.93
8 10 1 10 16.280 162.800 0.395 64.31
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
10 78 1 78 2.960 230.880 0.617 142.45
10 78 1 78 1.760 137.280 0.617 84.70
8 10 1 10 16.440 164.400 0.395 64.94
Position Diametre Nombre Nombre Nombre Long-unitaire Long-total Poids unitaire Poids total
en(N°) en(mm) Par Elément d'éléments Total en (N°) en(ml) en(ml) en(Kg/ml) en(Kg)
6 7 1 7 0.600 4.200 0.222 0.93
6 4 1 4 1.190 4.760 0.222 1.06
Page 56/58
Rapport sur la compatibilité concernant Detail
de calcul Acier-mois 05-2018-MEGEC.xls
Exécuté le 10/07/2018 10:32