NOTE DE CALCUL CHAUFFAGE CENTRAL

SERPENTIN

Perte de long du Perte de Perte de


ϪT EQUIV. Puissance (W/m²) Pu.Total NOMBRE NB DEPART charge troncon charge total charge total
Niveau Zone Surface DN adopté
(°C) W - Cal (KW) ELEMENT ESPACE mm CE/m m mm CE/m bars
S1=AQUARIUM + HOME CINEMA 147 10 860 120 17.64 PER 13/16 7 7.92 100.00 107.80 0.01
S2=PISCINE 27 10 860 120 3.24 PER 13/16 1 167.94 135.00 22,671.47 2.27
T1=S1+S2 174 10 860 120 20.88 26/34 7 7.49 124.29 132.93 0.01
S3= SALLE CHAUDE SIEGE 5 10 860 120 0.60 PER 13/16 1 481.83 25.00 12,045.70 1.20
S6= SALLE TIEDE HAMMAM 9 10 860 120 1.08 PER 13/16 1 333.69 45.00 15,016.17 1.50
T2=S3+S4+S5+S6+S7 14 10 860 120 1.68 PER 13/16 2 126.59 35.00 2,215.27 0.22
T3=T1+T2 188 10 860 120 22.56 26/34 9 5.55 104.44 64.39 0.01
SOUS SOL
S8= HAMMAM SALLE CHAUDE 5 10 860 120 0.60 PER 13/16 1 481.83 25.00 12,045.70 1.20
S10= SALLE CHAUDE SIEGE 5 10 860 120 0.60 PER 13/16 1 481.83 25.00 12,045.70 1.20
T4=S8+S10 10 10 860 120 1.20 PER 13/16 2 156.21 25.00 1,952.67 0.20
T5=T3+T4 198 10 860 120 23.76 33/42 11 4.39 90.00 35.96 0.00
S13= DRESSING 13 10 860 120 1.56 PER 13/16 2 132.59 32.50 2,154.55 0.22
T6=S13 13 10 860 120 1.56 PER 13/16 2 132.59 32.50 2,154.55 0.22
T7=T5+T6 211 10 860 120 25.32 33/42 13 3.57 81.15 22.31 0.00
R1=SALON EUROPEEN 86 10 860 120 10.32 PER 13/16 4 20.35 107.50 546.98 0.05
R2= GALERIE 22 10 860 120 2.64 PER 13/16 1 190.87 110.00 20,995.53 2.10
R3= SALON MAROCAIN 35 10 860 120 4.20 PER 13/16 1 142.79 175.00 24,988.71 2.50
R4= SALON 35 10 860 120 4.20 PER 13/16 1 142.79 175.00 24,988.71 2.50
R5= SAM 39 10 860 120 4.68 PER 13/16 1 133.45 195.00 26,023.61 2.60
R6= HALL SALON 33 10 860 120 3.96 20/27 1 148.14 165.00 24,443.37 2.44
R7= HALL 16 10 860 120 1.92 PER 13/16 1 232.90 80.00 18,632.17 1.86
T11= R1+R2+R3+R4+R5+R6+R7 266 10 860 120 31.92 33/42 10 4.02 133.00 53.46 0.01
R8= BIBLIOTHEQUE RDC 39 10 860 120 4.68 PER 13/16 1 133.45 195.00 26,023.61 2.60
R9= SEJOUR 30 10 860 120 3.60 PER 13/16 1 157.23 150.00 23,585.16 2.36
R10= OFFICE 22 10 860 120 2.64 PER 13/16 1 190.87 110.00 20,995.53 2.10
RDC
R11= SAS 30 10 860 120 3.60 PER 13/16 1 157.23 150.00 23,585.16 2.36
R12= HALL ESCALIER RDC 32 10 860 120 3.84 PER 13/16 1 151.02 160.00 24,162.93 2.42
T12= R8+R9+R10+R11+R12 153 10 860 120 18.36 26/34 5 11.36 153.00 347.59 0.03
T13=T11+T12 419 10 860 120 50.28 40/49 15 2.02 139.67 18.78 0.00
R13= ENTREE 19 10 860 120 2.28 PER 13/16 1 209.18 95.00 19,872.43 1.99
R14= HALL 22 10 860 120 2.64 PER 13/16 1 190.87 110.00 20,995.53 2.10
R15= CHAMBRE PARENTS 66 10 860 120 7.92 PER 13/16 2 48.03 165.00 3,962.39 0.40
R16= DRESSING Mr 25 10 860 120 3.00 PER 13/16 2 88.11 62.50 2,753.31 0.28
R17= DRESSING Mme 22 10 860 120 2.64 PER 13/16 1 190.87 110.00 20,995.53 2.10
R18= S2B PARENTS 33 10 860 120 3.96 PER 13/16 1 148.14 165.00 24,443.37 2.44
T14= R13+R14+R15+R16+R17+R18 187 10 860 120 22.44 26/34 8 6.26 116.88 91.49 0.01
T15= 13+T14 606 10 860 120 72.72 50/60 23 1.04 131.74 5.98 0.00
Perte de long du Perte de Perte de
ϪT EQUIV. Puissance (W/m²) Pu.Total NOMBRE NB DEPART charge troncon charge total charge total
Niveau Zone Surface DN adopté
(°C) W - Cal (KW) ELEMENT ESPACE mm CE/m m mm CE/m bars
E1= CHAMBRE GARCON 35 10 860 120 4.20 PER 13/16 1 142.79 175.00 24,988.71 2.50
E2= DRESSING GARCON 7 10 860 120 0.84 PER 13/16 1 390.45 35.00 13,665.64 1.37
E4= CHAMBRE FILLE 2 30 10 860 120 3.60 PER 13/16 1 157.23 150.00 23,585.16 2.36
E5= SDB CHAMBRE FILLE 2 8 10 860 120 0.96 PER 13/16 1 359.18 40.00 14,367.36 1.44
E6= DRESSING CHAMBRE 2 14 10 860 120 1.68 PER 13/16 1 253.17 70.00 17,722.15 1.77
E7= DRESSING FILLE 17 10 860 120 2.04 PER 13/16 1 224.24 85.00 19,060.61 1.91
E8= CHAMBRE FILLE 1 35 10 860 120 4.20 PER 13/16 1 142.79 175.00 24,988.71 2.50
E9= DRESSING FILLE 1 10 10 860 120 1.20 PER 13/16 1 312.43 50.00 15,621.34 1.56
E10= SDB FILLE 1 12 10 860 120 1.44 PER 13/16 1 278.78 60.00 16,726.74 1.67
T16= E1+E2+E3+E4+E5+E6+E7+E8+E9+10 168 10 860 120 20.16 26/34 9 5.95 93.33 61.73 0.01
ETAGE
E11= CHAMBRE 2 25 10 860 120 3.00 PER 13/16 1 176.21 125.00 22,026.52 2.20
E12= S2B CHAMBRE 2 5 10 860 120 0.60 PER 13/16 1 481.83 25.00 12,045.70 1.20
E13= COULOIR + DRESSING 13 10 860 120 1.56 PER 13/16 1 265.18 65.00 17,236.42 1.72
E14= SDB CHAMBRE 1 7 10 860 120 0.84 PER 13/16 1 390.45 35.00 13,665.64 1.37
E15= CHAMBRE 1 25 10 860 120 3.00 PER 13/16 1 176.21 125.00 22,026.52 2.20
E16= COULOIR ESCALIER 24 10 860 120 2.88 PER 13/16 1 180.77 120.00 21,691.90 2.17
E17= BIBLIOTHEQUE ETAGE 21 10 860 120 2.52 PER 13/16 2 98.25 52.50 2,579.05 0.26
T17= E11+E12+E13+E14+E15+E16+E17 120 10 860 120 14.40 26/34 8 8.26 75.00 77.47 0.01
T18= T17+T16 288 10 860 120 34.56 33/42 17 2.25 84.71 11.21 0.00
TOTAL 1 = T9+T15+T18 1105 10 860 120 132.60 66/76 53 0.31 104.25 0.61 0.00

TOTAL SS 4 = SS 4'+SS 3 266 10 860 31.92 33/42

TOTAL 1 = T9+T10+T15+T18 1371 10 860 164.52


NOTE DE CALCUL CHAUFFAGE CENTRAL
RADIATEUR & SECHE-SERVIETTES

ϪT EQUIV. PUISSANCE NOMBRE DEBIT DEBIT DEBIT Vitesse Section Diametre² Diametre
Niveau Zone Surface DN adopté
(°C) W - Cal (KW) ELEMENT (l/h) (m³/h) (m³/s) (m/s) m² m² m
S2=PISCINE 27 10 860 2.70 232.2 0.2322 6.45E-05 1 0.000 0.000 0.009 PER 13/16
S4= SECHE SERVIETTE HAMMAM 11 10 860 1.10 94.6 0.0946 2.6277778E-05 1 0.000 0.000 0.006 PER 13/16
S5= SECHE SERVIETTE TOIL 5 10 860 0.50 43 0.043 1.1944444E-05 1 0.000 0.000 0.004 PER 13/16
S7= S.S SALLE DE MASSAGE 28 10 860 2.80 240.8 0.2408 6.6888889E-05 1 0.000 0.000 0.009 PER 13/16
S9= SECHE SERVIETTE TOIL 5 10 860 0.50 43 0.043 1.1944444E-05 1 0.000 0.000 0.004 PER 13/16
S11= SECHE SERVDOUCHE HAMAM 3 10 860 0.30 25.8 0.0258 7.1666667E-06 1 0.000 0.000 0.003 PER 13/16
T4'=S2+S4+S5+S7+S0+S11 79 10 860 9.48 815.28 0.81528 0.0002264667 1 0.000 0.000 0.017 20/27
S12= ECALIER DRESSING SOUS SOL 8 10 860 0.96 8 82.56 0.08256 2.2933333E-05 1 0.000 0.000 0.005 PER 13/16
T5'= T4'+S12 87 10 860 10.44 897.84 0.89784 0.0002494 1 0.000 0.000 0.018 20/27
S14=HALL SOUS SOL 30 10 860 3.60 31 309.6 0.3096 8.6E-05 1 0.000 0.000 0.010 PER 13/16
S15= CH 3 SOUS SOL 14 10 860 1.68 15 144.48 0.14448 4.0133333E-05 1 0.000 0.000 0.007 PER 13/16
S16= SALON SERVICE 7 10 860 0.84 7 72.24 0.07224 2.0066667E-05 1 0.000 0.000 0.005 PER 13/16
SOUS SOL S17= CH 1 SOUS SOL 15 10 860 1.80 16 154.8 0.1548 4.3E-05 1 0.000 0.000 0.007 PER 13/16
S18= CH 2 SOUS SOL 15 10 860 1.80 16 154.8 0.1548 4.3E-05 1 0.000 0.000 0.007 PER 13/16
T8=S14+S15+S16+S17+S18 81 10 860 9.72 835.92 0.83592 0.0002322 1 0.000 0.000 0.017 20/27
S19=SALON SERVICE SOUS SOL 20 10 860 2.40 21 206.4 0.2064 5.7333333E-05 1 0.000 0.000 0.009 PER 13/16
S20= CH CHAUFFEUR 13 10 860 1.56 14 134.16 0.13416 3.7266667E-05 1 0.000 0.000 0.007 PER 13/16
T10=S19+S20 33 10 860 3.96 34 340.56 0.34056 9.46E-05 1 0.000 0.000 0.011 20/27
BLOC SANITAIRE HOMME ENTREE 9 10 860 1.08 92.88 0.09288 2.58E-05 1 0.000 0.000 0.006 PER 13/16
BLOC SANITAIRE HOMME ENTREE 9 10 860 1.08 92.88 0.09288 2.58E-05 1 0.000 0.000 0.006 PER 13/16
RDC BLOC SANITAIRE OFFICE 4 10 860 0.48 41.28 0.04128 1.1466667E-05 1 0.000 0.000 0.004 PER 13/16
T11' 22 10 860 2.64 227.04 0.22704 6.3066667E-05 1 0.000 0.000 0.009 20/27
R18= S2B PARENTS 33 10 860 3.96 340.56 0.34056 9.46E-05 1 0.000 0.000 0.011 PER 13/16
T12' 33 10 860 3.96 340.56 0.34056 9.46E-05 1 0.000 0.000 0.011 20/27
E3= SECHE SERVIETTE SDB GARCON 11 10 860 1.32 113.52 0.11352 3.1533333E-05 1 0.000 0.000 0.006 PER 13/16
E5= SDB CHAMBRE FILLE 2 8 10 860 0.96 82.56 0.08256 2.2933333E-05 1 0.000 0.000 0.005 PER 13/16
E10= SDB FILLE 1 12 10 860 1.44 123.84 0.12384 3.44E-05 1 0.000 0.000 0.007 PER 13/16
T16= E3+E5+10 31 10 860 3.72 319.92 0.31992 8.8866667E-05 1 0.000 0.000 0.011 20/27
ETAGE
E12= S2B CHAMBRE 2 5 10 860 0.60 51.6 0.0516 1.4333333E-05 1 0.000 0.000 0.004 PER 13/16
E14= SDB CHAMBRE 1 7 10 860 0.84 72.24 0.07224 2.0066667E-05 1 0.000 0.000 0.005 PER 13/16
T17= E12+E14 12 10 860 1.44 123.84 0.12384 3.44E-05 1 0.000 0.000 0.007 20/27
T18= T17+T16 43 10 860 5.16 443.76 0.44376 0.0001232667 1 0.000 0.000 0.013 20/27
TOTAL SS = T9+T10+T15+T18 190 10 860 22.80 1960.8 1.9608 0.000544666667 1 0.001 0.001 0.026 33/42

TOTAL SS 1'= T4' 79 10 860 9.48 815.28 0.81528 0.0002264667 1 0.000 0.000 0.017 20/27
TOTAL SS 2'= S12 8 10 860 0.96 82.56 0.08256 2.2933333E-05 1 0.000 0.000 0.005 20/27
TOTAL SS 2= S12 87 10 860 10.44 897.84 0.89784 0.0002494 1 0.000 0.000 0.018 20/27
TOTAL SS 3'= T8+T11'+T17 115 10 860 13.80 1186.8 1.1868 0.0003296667 1 0.000 0.000 0.020 20/27
TOTAL SS 3= SS 3'+SS 2 202 10 860 24.24 2084.64 2.08464 0.0005790667 1 0.001 0.001 0.027 33/42
TOTAL SS 4' =T12+T16 64 10 860 7.68 660.48 0.66048 0.0001834667 1 0.000 0.000 0.015 20/27
TOTAL SS 4 = SS 4'+SS 3 266 10 860 31.92 2745.12 2.74512 0.0007625333 1 0.001 0.001 0.031 33/42
Puissance thermique (Watt) = débit massique d'eau (kg/s) * capacité calorifique de l'eau (4186 J/kg.K) * diffe

débit massique (kg/s) = débit volumique (m3/s) * masse volumique eau (1000 kg/m3)

capacité calorifique de l'air 1000 kJ/kg.K

masse volumique de l'air 1.2 kg/m3

Difference
Debit Capacite Masse
Puissance Temperatur Debit
Massique Calorifique Volumique
Thermique e Volumique
Eau Eau EAU
ϪT
(Watt) (Kg/s) (J/Kg.K) (°C) (m³/s) (Kg/m³)

14999.6938 0.71666 4186 5 0.00071666 1000

Difference
Debit Capacite Masse
Puissance Temperatur Debit
Massique Calorifique Volumique
Thermique e Volumique
Eau Eau EAU
ϪT
(Watt) (Kg/s) (J/Kg.K) (°C) (m³/s) (Kg/m³)

14999.6938 0.71666 4186 5 0.00071666 1000

http://forum.rue-montgallet.com/ruemontgallet/OverclockingTuningSilence/Refroidissement/experience-mesurant-puissance-s
au (4186 J/kg.K) * difference de temperature entrée-sortie (°C)

ence-mesurant-puissance-sujet_26613_1.htm