Vous êtes sur la page 1sur 27

Production 15-Dec-22 ### Vizag Steel's Performance

(All figures are provisional) Unit : Tonnes unless otherwise stated


For the month (DEC'22) Actual 2022-2023 (APR-DEC) ('000 t) Best
Item ON DATE Cuml. Avg./ Plan Expected % CPLY Last BEST 2022 - 23 APP Expected % 0 Actual (t) Performan
Plan Act. day '000 t Rate Ful 0 Month DEC (till date) PLAN Rate Ful CPLY 2021 - 22 2020 - 21 ce
(DEC'21) (NOV'22) 0 0 0 Monthly Month Yearly Year

TIPPLING/day-Nos 624 610### 5893 393 624 512### 82 503 436.3 635 335 537 339 63 498 488.6 396 665 Mar'20 582 2004-05
SIZED ORE 6500 5800### 74680 4979 202 179### 89 226000 155260 220010 1141820 1481 1246 84 1584 2166335 1806540 226585 Jan'22 2166335 2021-22
OVENS/day-Nos 350 352### 5172 345 350 347### 99 399.6 324.7 346 285 271 288 107 390 375.5 296.0 411.5 Feb'21 375.5 2021-22
BASE MIX 24500 25600### 328300 21887 844 721### 85 889400 643100 823840 4751900 5527 5144 93 6713 8929400 7000300 889400 Dec'21 8929400 2021-22
GROSS SINTER 26000 26016### 338551 22570 775 742### 96 785856 568009 705203 4454396 4970 4858 98 6000 8004130 6401961 787091 Jan'22 8004130 2021-22
0
HOT METAL 15000 15150### 223150 14877 466 465### 100 504500 378550 544170 2872757 3019 3115 103 4428 5773650 4681615 579350 Mar'21 5773650 2021-22
PCM POURING 0 ###
0 729 49 0.0 0.7### ** 2088 567 106058 43771 89 44 49 87 91995 42995 107463 Mar'93 1100263 1993-94
PIG IRON 0 ###
0 632 42 0.0 0.6### ** 1806 492 95452 37974 77 38 49 76 80283 37648 96717 Mar'93 985497 1993-94
HEATS/day-Nos(Total) 102 102### 1445 96.3 102 99### 97 110.1 82.6 113.2 71.9 72.2 74 102 104 102.4 82.7 128.0 Feb'21 104.4 2018-19
HEATS/day-Nos-SMS-1 65 64### 774 52 63.2 59### 93 65.3 45.5 71.5 37.9 42.1 39.4 93.7 54.2 54.2 38.8 79.3 Feb'06 68.9 2006-07
HEATS/day-Nos-SMS-2 37 38### 671 45 38.8 41### 105 44.8 37.1 48.6 34.1 30.1 34.2 113.8 49.6 48.2 43.8 57.3 Feb'21 48.2 2021-22
0
LIQUID STEEL (Total) 14924 15108### 214590 14306 463 453### 98 504975 373858 521916 2797430 2908 3036 104 4196 5517526 4491658 565066 Mar'21 5516753 2021-22
LIQUID STEEL-SMS-1 9357 9408### 113940 7596 282 264### 93 294187 203420 317010 1438809 1667 1589 95 2118 2836595 2056912 341227 Mar'10 3606178 2006-07
LIQUID STEEL - SMS-2 0 5567 5700### 100650 6710 181 190### 105 210788 170438 231443 1358409 1241 1447 117 2078 2680931 2434746 266127 Jul'21 2680145 2021-22
CAST BLOOM (Total) 14208 14393### 204805 13654 441 432### 98 481518 359143 498442 2678765 2776 2906 105 4010 5271738 4301807 537174 Mar'21 5271899 2021-22
CAST BLOOM-SMS-1 8826 8892### 107677 7178 266 249### 94 278007 192846 298689 1362052 1572 1503 96 2001 2679940 1947903 322385 Mar'10 3396966 2006-07
CAST BLOOM - SMS-2 5382 5501### 97128 6475 175 183### 105 203511 166297 224426 1316712 1201 1403 117 2010 2591798 2353903 257977 Jul'21 2590779 2021-22

BILLETS 6200 6330### 72082 4805 175 160### 92 180811 143222 195752 868029 1103 956 87 1328 1772347 1329637 203001 Mar'06 2077666 2005-06
BAR MILL 3300 2747### 31756 2117 70 62### 88 83634 70943 80803 405467 479 435 91 634 848971 551839 92231 Mar'11 886574 2018-19
SPECIAL BAR MILL 1200 1395### 25804 1720 54 52### 96 56559 30995 45588 344574 322 371 115 300 427043 262247 56571 Oct'22 497075 2018-19
WIRE ROD MILL-1 3400 2857### 37675 2512 92 86### 93 83137 80489 97544 438849 590 487 82 685 914664 747716 108076 Mar'10 1055040 2006-07
WIRE ROD MILL-2 1000 1425### 25985 1732 52 55### 106 51991 54776 51719 358931 339.0 387.8 114 367 506805 430477 58900 Mar'19 554465 2019-20
MMSM 1600 2228### 30702 2047 50 54### 109 66620 44390 100192 393419 374.0 417.1 112 538 717496 463375 111534 Mar'10 1076643 2006-07
STRUCTURAL MILL 2000 1673### 30136 2009 48 54### 113 50058 49425 39940 370489 342 395 115 316 412696 256365 63574 Sep'22 412696 2021-22
FINISHED STEEL 12500 12323### 182058 12137 366 363### 99 384853 331017 382283 2303594 2438 2484 102 2774 3750380 2693831 409856 Mar'18 4235469 2018-19
SALEABLE STEEL 13113 13751### 190465 12698 385 381 0 99 409566 343634 463895 2520326 2686 2711 101 3885 5137943 4162603 521199 Mar'19 5137943 2021-22
POWER GEN(Total)-MW 330 221### 226 226 330 226 0 68 315.7 206 360 195 279 197 71 352 327.9 314.4 394.1 Mar'21 359 2018-19
GROSS COKE 8042 8088### 118832 7922 252 246 0 97 269475 223830 ** 1678407 1694 1805 107 2380 3045253 2478650 285950 Mar'21 3045253 2021-22
BF COKE 6810 6849### 100626 6708 217 208 0 96 231889 190164 ** 1422414 1458 1530 105 2054 2626424 2133767 247657 Mar'21 2626424 2021-22
AMM. SULPHATE 145 122### 1995 133 5 4.1 0 91 4192 3846 ** 28108 30 30.2 100 39.6 50207 42241 4834 Mar'21 50207 2021-22
CRUDE TAR 358 347### 5097 340 11 10.5 0 95 11676 9658 ** 71513 75 76.9 103 102.4 129902 104498 12301 Mar'21 129902 2021-22
0 TAR PRODUCTS 201 275### 2776 185 6 5.7 0 92 8080 5594 ** 50756 37 53.7 146 57.6 74235 74700 8714 Oct'15 90256 2015-16
HP NAPTHALENE 4 ###
5 46 3 0.1 0.1 0 73 174 102 ** 1136 0.8 1.2 150 1.3 1669 1502 406 Feb'96 3483 1995-96
CRUDE BENZOL 56 10### 70 5 2 0.1 0 8 1244 279 ** 5800 11.7 5.9 50 8.0 11425 11215 2134 Mar'96 20008 2017-18
GRAN. SLAG 5445 5900### 86941 5796 166 180 0 108 196473 149252 ** 1125357 1074 1218 113 1615 2134288 1587340 ** ** ** **
ENGG. SHOPS 47 32### 381 25 1.5 0.8 0 54 1395 1439 ** 11596 13.2 12.0 91.2 12.0 16046 14760 1875 Dec'12 17592 2004-05
TEMP. BRICKS 5 ###
0 22 1 0.2 0 0 28 118 26 ** 426 1.0 0.4 46.7 0.6 754 1354 2037 Mar'96 18039 1994-95
GROSS LIME 1447 1277### 20514 1368 45 42 0 95 47254 39186 ** 308368 284.9 330.2 115.9 411.7 537265 449159 52243 Feb'21 549504 2018-19
GROSS CAL DOLO 321 305### 4181 279 10 8.6 0 87 7431 8643 ** 58770 86.6 63.2 73.0 82.8 104632 90958 12534 Nov'17 122372 2018-19
BF Limestone from JLM 516 220### 3258 217 16 7 0 42 ** 2848 ** 85090 98.0 88.6 ** 229.0 301618 197630 56124 Dec'13 457620 2006-07
BF/SMS Dolomite from MDM 1806 1500### 20470 1365 56 42 0 76 ** 46200 ** 343007 437.0 364.8 83 355.1 405542 146864 65240 Mar'07 680293 2005-06
Mn Ore from GARBHAM 19 0### 0 0 0.6 0.0 0 0 ** 0 ** 2719 1 ** ** ** 4421 879 ** ** ** **
BF DOLO ( 4 DAYS ) & BF LS ( 4 DAYS ) STOCKS ARE CRITICAL.

MCC ( 5 DAYS) STOCK IS VERY LOW.

SMS LS ( 7 DAYS ) & BC ( 7 DAYS) STOCKS ARE LOW.

0
### Production Planning and Monitoring PAGE NO:-1
Despatches 15-Dec-22### Vizag Steel's Performance
(All figures are provisional) Unit : Tonnes unless otherwise stated
Actual (t) Approx
Item ON DATE For the month (DEC'22) Last 2022- 2021- Loadable stock as on
Plan Act. Cuml. Avg/ Plan Rate ### % month 2023 2022 Ist 16-Dec
day 000t ful (NOV'22) (till date) (6 A.M) Movement to CDY On date To date

FINISHED STEEL 11806 13098 164122 10941 366 339.2 ### 93 310430 2234895 3770928 28201 42221 BSY-1 0 0
BAR PRODUCTS 2258 2660 26344 1756 70 54.4 ### 78 63130 389868 848066 8785 14385 BSY-2 0 0
SBM PRODUCTS 1742 1946 20699 1380 54 42.8 ### 79 35321 332834 429615 1483 5759 Billets 0 130
WIRE RODS -1 2968 1986 33367 2224 92 69.0 ### 75 75355 422743 896647 5317 7821 BARS 1591 17122
WIRE RODS -2 1677 2442 25402 1693 52 52.5 ### ** 49303 349503 506600 5203 5150 WRM-1 1248 22745
MMSM PRODUCTS 1613 2427 31586 2106 50 65.3 ### 131 37860 379511 670532 5766 5287 WRM-2 2271 24653
STM PRODUCTS 1548 1636 26724 1782 48 55.2 ### 115 49461 360436 419468 1647 3821 MMSM 2045 23354
SALEABLE BILLETS(LMMM) 32 57 329 22 1 0.8 ### 85 439 4839 16297 33 0 SBM 1244 15506
SALEABLE BILLETS(MMSM) 0 0 0 0 0 0.5 ### 0 0 7929 56281 58 58 STM 1480 24431
SALEABLE CC BLOOMS 581 1371 8078 539 18 17.4 ### 96 12173 203849 1315125 2000 6000 Total 9879 127942
SAL.BLOOMS (SMS-1 & MMSM150) 226 34 1880 125 7 ** ### ** 6557 60452 131459 ** **
SAL.CC BLOOMS -2 355 1337 6198 413 11 ** ### ** 5616 143398 1183666 2000 6000 Ondate Todate
CUTTINGS 0 0 0 0 0 ** ### ** 0 0 0 ** ** Road Despatches (Total) 20814 248269
-Billetend ** 0 0 0 0.0 ** ### ** 0 0 0 ** ** Pig Iron-Total (Road) 0 0
Bloom scrap 0.0 0 0 0 0.0 0.0 ### 0.0 0 983 824 ** ** - Domestic 0 0
T & B chips 0.0 0 0 0 0.0 0.0 ### 0.0 0 0 261 ** ** - Export 0 0
MILL Mix Steel Scrap ** 0 0 0 ** ** ### ** 338 882 793 ** **
Tundish Skull/Chilled Cast Steel 0.0 0 0 0 0.0 ** ### ** 0 0 577 ** **
Steel Scarp from Slag 0.0 0 0 0 0.0 ** ### ** 30 1115 492 ** ** DESPATCH RAKE RETENTION DETAILS
PIG IRON 97 0 0 0 3.0 0.0 ### 0.0 0 42978 82153 2500 3450 On date Till date
GRAN SLAG(TOTAL) 6452 9460 115738 7716 200 239.2 ### 120 193941 1615446 2426228 ** ** Rakes (Nos) 3 56
GRAN SLAG(SSY-1) ** 5586 79127 5275 0 ** ### ** 112494 1229228 ** ** ** Retention Time (Hrs) 9.94 11.30
GRAN SLAG(SSY-2) ** 3874 36612 2441 0.0 ** ### ** 81447 386218 ** ** **
COKE DUST 81 133 2204 147 2.5 4.6 ### 182 2502 24503 11967 ** ** INCOMING RAKE RETENTION DETAILS
COKE SLUDGE 32 21 797 53 1.0 1.6 ### 165 1993 11544 26077 ** ** On date Till date
NUT COKE 0 0 0 0 0.0 0.0 ### 0 0 0 6826 ** ** Rakes (Nos) 8 102
Iron Scrap - Muck & Fines 0 0 0 0 0.0 0.0 ### 0 0 0 127 ** ** Retention Time (Hrs) 15.44 9.75
AMM.SULPHATE 197 150 1685 112 6.1 3.5 ### 57 3315 27689 52027 1900 2278
CRUDE TAR 81 62 1843 123 2.5 3.8 ### 152 1924 18506 41117 150 150
HP NAPHTHA 5 0 0 0 0.2 0.0 ### 0 119 1118 1568 53 88
PITCH 77 206 1252 83 2.4 2.6 ### 108 2422 18554 25585 30 30
BENZENE 16 0 0 0 0.5 0.0 ### 0 211 3648 5429 229 158
TOLUENE 3 0 0 0 0.1 0.0 ### 0.0 118 791 1022 18 0
LSO/SOL/St.B.Oil/DNO/Ph. Fr 9 0 24 2 0.3 0.0 ### 18 118 1718 2451 186 224
POOLED IRON/Fines & Chunks 8 0 0 0 0.3 0.0 ### 0 0 9765 70343 0 0
CI SCRAP / JAMS 5 0 148 10 0.2 0.3 204 0 4433 10015 ** **
CRMP LS Returns/Chips 0 0 0 0 0 0 0 0 19225 29284 ** **
LIME FINES 160 101 2251 150 5.0 4.7 ### 93 3360 26182 31307 ** **
BC MILL REJCTS 0 0 0 0 0 0.0 ### ** 0 589 3471 ** **
LD Slag / Muck & Debris ** 0 2423 162 0 ** ### ** 5686 24303 57618 ** **
FLY ASH ** 537 7756 517 0 ** ### ** 12872 98653 140449 ** **
Liq. OXYGEN(t) 0.0 0 0 0 0 0.0 ### ** 525 1233 10727 ** **
Liq.NITROGEN(t) 0.0 30.7 280.0 18.7 0 0.6 ### ** 778 7429 7668 ** **
Liq.ARGON(t) 0.0 0.0 0.0 0.0 0.0 0.0 ### ** 0 257 1019 ** **

0 0.0
TOTAL ('000 t) 19.6 25.2 308.9 20.6 609.1 630.5 ### 104 553.4 4414.2 8142.0 ** **

Production Planning and Monitoring PAGE NO: 4


Raw materials 15-Dec-22 Vizag Steel's Performance
On Date For the month For the month ('000t) Last month 2022 -23 2021 - 22 Approx Reclm. No of
Rakes/ t Comulative(t) rakes Plan Rate % ful Actual (t) (till date) ACTUAL stocks (t) Days
ICC TOTAL 6508 189999 0 375 393 105 317190 1692334 2801081 166857 14
ICC - Aus. Hard CC 0 50124 0 ** ** ** 93528 676232 1899715 53690 22
Goonyella/Mn/GYMS 0 50124 0 ** ** ** 93528 512213 1501606 49389 **
PD 0 0 0 ** ** ** 0 164019 4301 **
ICC-Non-Aus. Hard CC 6508 95967 0 ** ** ** 142298 894987 891230 66460 13
Creek 819 69935 0 ** ** ** 81973 389639 494195
39027 **
Tech Eagle 0 0 0 ** ** ** 0 0 71891
Benga @ 0 18501 0 ** ** ** 58807 290869 297375 19902 **
Tuhup 5689 7531 0 ** ** ** 1518 214479 27551 7531 **
Imported Soft Coal 0 43908 0 ** ** ** 81364 713899 1690522 46707 16
BD SOFT 0 0 0 ** 0 0 19 77775 0 62 **
Moura Soft 0 43908 0 ** ** ** 0 43908 239379 43906 **
Kestrel 0 0 0 ** ** ** 81345 270481 632317 1404 **
BWS 0 0 0 ** ** ** 0 321735 818826 1335 **
PCC 0 3682 1 20 8 38 14790 43340 10136 14140 **
MCC in CC Bed 0 18771 5 40 39 97 22505 191769 194811 6200 5
BC TOTAL 0 35784 9 180 74 41 72979 544817 919214 34866 7
-Talcher 0 7983 2 ** ** ** 41293 195608 591105 ** **
-BOCM / Others ** 0 11351 3 ** ** ** 19384 247326 180306 ** **
-Singareni 0 16450 4 ** ** ** 12302 101882 147803 ** **
Imported BC 0 11978 0 40 ** ** 32967 214858 366082 12681 10
PCI Coal / BWS for BF 6164 12106 0 80 25 ** 67500 162793 705192 12795 6
I-O-L(RMHP) 2 / 9154 81533 18 260 169 65 241473 1661217 3117800 93253
9
I-O-L (IOSA) ** ** ** ** ** ** ** ** ** 0
SIZED ORE 0 0 0 0 0 ** 0 820 1069229 102976 16
I-O-F (RMHP) 128528 31 400 266 66 320694 2068524 3835666 224785
4 / 16919
I-O-F (IOSA) ** ** ** ** ** ** ** ** 73344 16
I-O-F (Slime) 0 61241 15 200 127 63 108617 656017 1353377 **
I-O-F (Road) & MUY 0 0 ** ** ** ** 0 0 0 6072
BF L/S 0 7670 2 16 16 99 3998 82283 318989 3419 4
SMS L/S 1 / 3938 55267 14 140 114 82 93949 656649 1278970 26559 7
BF DOLO -Tot 0 19221 5 52 40 76 49891 344884 729924 7870 4
-BRMP/BYL/BUA 0 7632 2 12 16 131 15703 111383 359639 ** **
-Madharam 0 11589 3 40.0 24.0 60 34188 233501 370285 ** **
SMS DOLO -Tot 0 11478 3 28 24 85 7877 111545 245862 7014 8
-Madharam 0 11478 3 16.0 23.7 148 7877 93201 72440 ** **
-BYL/BUA/BKL 0 0 0 12.0 0.0 0 0 16796 173423 ** **
MnORE(L) 0 208 0 1 0.4 72 0 2822 8266 408 **
MnORE(F) 0 0 0 0 0.0 0 0 0 0 0 **
SAND / QTZ(F) 0/0 0 /98 0 1.6 0.2 13 0 16686 38250 5468 **
QTZ (L) 64 354 ** 1.0 0.7 73 200 4472 17060 3553 **
BF Coke 0 0 0 0 0.0 ** 0 0 0 6219 **
Anthracite coal 0 0 0 0 0 0 0 66 18250 1660 **
Iron ore Pellets 0 0 0 0 0 ** 0 207 23763 0 **
SINTER(at OHP) 0 0 0 ** ** ** 0 0 0 0 **
OLI FLUX (BY ROAD ) 0 0 ** 0 ** ** 0 0 0 500 **
@ BENGA - SAIL (t) 0 Indonesian BC - VZP (t) 3876 ++ SMS LS - VZP (t) 0
Production Planning and Monitoring PAGE NO: 3
Unit wise Production 15-Dec-22 Vizag Steel's Performance
(All figures are provisional) Unit : Tonnes unless otherwise stated
For the month (DEC'22) Actual
Item On Date Cuml. Avg./ CPLY Last BEST 2022 - 23 Actual (t)
Plan Act. day Month DEC (till date) 2021 - 22 2020 - 21 Best Performance
(DEC'21) (NOV'22) Daily Day Monthly Month Yearly Year
Production

TIPPLING/day-Nos 624 610 5893 393 ### 503 436 635 335 489 396 932 11.12.03 665 Mar'20 582 2004-05
SIZED ORE ( Total ) 6500 5800 74680 4979 ### 226000 155260 220010 1141820 2166335 1806540 11100 10.02.20 226585 Jan'22 2166335 2021-22
- LOCP-1 4000 2750 43300 2887 ### 116795 97280 147974 700460 1271270 1137490 9450 22.04.18 157500 Mar'15 1578590 2006-07
- LOCP-2 2500 3050 31380 2092 ### 109205 57980 82160 441360 895065 669050 5300 11.02.22 109205 Dec'21 895065 2021-22
OVENS/day-Nos 350 352 5172 345 ### 400 325 346 285 375 296 419 03.03.21 412 Feb'21 376 2021-22
BASE MIX(Total) 24500 25600 328300 21887 ### 889400 643100 823840 4751900 8929400 7000300 34800 23.04.21 889400 Dec'21 8929400 2021-22
- RMB 14500 12500 175900 11727 ### 545700 383500 573500 2571100 5444200 4380850 26200 26.01.11 612000 Oct'11 6374950 2005-06
- RMPP 10000 13100 152400 10160 ### 343700 259600 393400 2180800 3485200 2619450 16700 03.01.21 393400 Dec'20 3485200 2021-22
GROSS SINTER(Total) 26000 26016 338551 22570 ### 785856 568009 705203 4454396 8004140 6401961 30500 13.03.20 787091 Jan'22 8004130 2021-22
- M/C-1 9500 9181 120734 8049 ### 259314 219556 307815 1801364 2678067 3017255 12175 29.12.19 307815 Dec'20 3017255 2020-21
- M/C-2 6000 6615 77878 5192 ### 211812 160043 262875 796162 2041451 1063111 10409 05.08.03 268846 Oct'05 2945992 2005-06
- M/C-3 10500 10220 139939 9329 ### 314730 188410 319590 1856870 3284622 2321595 13150 16.03.16 319590 Dec'20 3284612 2021-22
HOT METAL(Total) 15000 15150 223150 14877 ### 504500 378550 544170 2872757 5773650 4681615 20400 23.03.21 579350 Mar'21 5773650 2021-22
- F/C-1 7600 7500 106670 7111 ### 175705 183606 181067 1382738 1960596 2268050 8019 18.02.22 219552 Mar'22 2268050 2021-22
- F/C-2 7400 7650 116480 7765 ### 167815 194944 206410 1490019 2064396 1366750 8500 08.12.22 206410 Dec'19 2103067 2021-22
- F/C-3 0 0 0 0 ### 160980 0 233389 0 1748658 1046815 9040 22.12.18 235421 Nov'18 2521991 2017-18
HEATS/day-Nos(Total) 102 102 1445 96.3 ### 110.1 82.6 113.2 71.9 102.4 82.7 142 10.01.21 128.0 Feb'21 104.4 2018-19
- SMS-1 65 64 774 51.6 ### 65.3 45.5 71.5 37.9 54.2 38.8 86 27.09.04 79.3 Feb'06 68.9 2006-07
- SMS-2 37 38 671 44.7 ### 44.8 37.1 48.6 34.1 48.2 43.8 68 30.01.21 57.3 Feb'21 48.2 2021-22
LIQUID STEEL (Total) 14924 15108 214590 14306 ### 504975 373858 521916 2797430 5517526 4491658 20530 10.01.21 565066 Mar'21 5516753 2021-22
- SMS-1 9357 9408 113940 7596 ### 294187 203420 317010 1438809 2836595 2056912 12337 17.01.10 341227 Mar'10 3606178 2006-07
- SMS-2 5567 5700 100650 6710 ### 210788 170438 231443 1358409 2680931 2434746 10411 30.01.21 266127 Jul'21 2680145 2021-22
CAST BLOOM (Total) 14208 14393 204805 13654 ### 481518 359143 498442 2678765 5271738 4301807 19547 10.01.21 537174 Mar'21 5271899 2021-22
- SMS-1 8826 8892 107677 7178 ### 278007 192846 298689 1362052 2679940 1947903 11646 17.01.10 322385 Mar'10 3396966 2006-07
- SMS-2 5382 5501 97128 6475 ### 203511 166297 224426 1316712 2591798 2353903 9994 30.01.21 258124 Jul'21 2590779 2021-22
LMMM PRODUCTS 4500 4141 57560 3837 ### 140197 101938 0 750040 1276014 814086 #REF! #REF! 0 0 2077666 2005-06
BAR MILL 3300 2747 31756 2117 ### 83634 70943 80803 405467 848971 551839 4520 09.03.10 92231 Mar'11 886574 2018-19
SPECIAL BAR MILL 1200 1395 25804 1720 ### 56559 30995 45588 344574 427043 262247 3549 12.12.21 56571 Oct'22 497075 2018-19
WIRE ROD MILL-1 3400 2857 37675 2512 ### 83137 80489 97544 438849 914664 747716 4171 04.08.05 108076 Mar'10 1055040 2006-07
WIRE ROD MILL-2 1000 1425 25985 1732 ### 51991 54776 51719 358931 506805 430477 3444 31.03.19 58900 Mar'19 554465 2019-20
MMSM 1600 2228 30702 2047 ### 66620 44390 100192 393419 717496 463375 5561 23.02.10 111534 Mar'10 1076643 2006-07
STRUCTURAL MILL 2000 1673 30136 2009 ### 50058 49425 39940 370489 412696 256365 3100 01.03.20 63574 Sep'22 412696 2021-22
FINISHED STEEL(Total) 12500 12323 182058 12137 ### 384853 331017 382283 2303594 3750359 2693831 17081 25.12.20 409856 Mar'18 4235469 2018-19
- 3.0 Mt Stage Units 8300 7831 100133 6676 ### 226245 195821 272371 1229601 2403816 1762930 12839 25.03.10 308867 Mar'10 3010139 2006-07
- Expanstion Units 4200 4492 81925 5462 ### 158608 135196 137247 1073993 1346544 930902 7830 24.08.22 163803 Sep'22 1405644 2018-19
SALEABLE STEEL(Total) 13113 13751 190465 12698 ### 409566 343634 463895 2520326 5138197 4162603 24123 19.02.21 521199 Mar'19 5137943 2021-22
- 3.0 Mt Stage Units 8558 7922 102342 6823 ### 239124 202823 295560 1302825 2607853 1822941 ** ** 324943 Mar'10 3290155 2006-07
- Expanstion Units 4555 5829 88123 5875 ### 170442 140811 213366 1217501 2530344 2339661 ** ** 264683 Jul'21 2530618 2021-22
SEMIS (Total) 613 1428 8407 560 ### 24713 12617 ** 216732 1387563 1468772 10366 19.02.21 145067 Mar'15 795534 1995-96
- 3.0 Mt Stage 258 91 2209 147 ### 12879 7001 ** 73223 203889 60010 4542 30.03.13 139826 Mar'97 795534 1995-96
- Expanstion Units 355 1337 6198 413 ### 11834 5616 ** 143508 1184074 1408760 10280 19.02.21 138329 Mar'15 663669 2018-19
GROSS LIME (Total) 1447 1277 20514 1368 ### 47254 39186 ** 308368 537265 449159 2067 03.01.21 ** ** 549504 2018-19
GROSS LIME - Rotary Kilns 847 817 13154 877 ### 19717 24200 ** 125151 241230 189645 ** ** ** ** 302968 2015-16
GROSS LIME - Shaft Kilns 600 460 7370 491 ### 27537 14986 ** 183227 298591 276130 ** ** ** ** ** **
Production Planning and Monitoring PAGE NO: 2
Technoeconomics 15-Dec-22 Vizag Steel's Performance
(All figures are provisional)
R M H P (Nos) 0 COKE OVENS 0 BF Ondate Todate SMS On Date To Date HEATS MADE (Nos)
Material O.B Recpt Tiplng C.B Avg. Pushing Ondate Todate Avg/Day BF-1 BF-2 BF-3 Over All BF-1 BF-2 BF-3 Over All SMS-1 SMS-2 SMS-1 SMS-2 SHIFT SMS-1 SMS-2
ANTHRACITE 0 0 0 0 0 (Nos) 0.0 0.0 Heats made Nos/day 64 38 52 45 A 21 12
ICC 0 0 0 0 0 Batt-1 67 1016 67.7 No of casts 14 14 0 28 180 179 0 359 Liquid Steel Production -t/day 9408 5700 7596 6710 B 23 13
MCC/PCC 58 0 58 0 23 Batt-2 85 1225 81.7 Productivity on 0 0 0 0 Avg.heat wt. t 147.0 150.0 147.2 150.0 C 20 13
BC+IBC 89 0 89 0 35 Batt-3 48 673 44.9 Working Vol. 2.24 2 2.26 2.19 2.34 0.00 2.26 Blooms made Nos 2593 2584 31118 46428 On Date 64 38
I/Ore 45 351 302 94 244 Batt-4 61 897 59.8 -t/cum/avl.day 0 0 0 0 0 0.0 0.0 Cast bloom yield % 94.5 96.5 94.5 96.5 Till Date 774 671
Sinter 0 0 0 0 0 Batt-5 91 1361 90.7 0 0 0 0 0 Consumption 0 0 0 0 0 0 0 0
Flux 105 56 161 0 91 Total 352 5172 345 %Sinter in burden 75.7 77 0.0 76.2 75.3 77.3 76.4 Hot metal Kg/tls 995 998 995 998 0 0 0
BF Coke 0 0 0 0 0 Shift-wise pushing-Nos 0 0 107/128/117 0 0 0 Steel Scrap Kg/tls 90 107 88 106 0 0 0
CHP 147 0 147 0 58 CPP 0 0 STOCKS (t) %Pellets in burden 0.0 0 0 0.0 0.0 0.0 0.0 Iron scrap/Pig iron Kg/tls 0 0 0 0 0 0 0
O&F 150 407 463 94 335 0 Total - MB Stock 0 6265 0 0 Szd Ore Kg/tls 0 17 0 17 0 0 0
RMHP 297 407 610 94 393 0 Coal Tower-1 0 2000 %SZD Ore in burden 24 23 0 24 25 23 24 Sinter Kg/tls 10 0 10 0 0 0 0
RECLAIMING (t) 0 Ondate 0 Todate 0 Coal Tower-2 0 3500 0 0 0 Calcined Lime Kg/tls 61 63 61 63 0 0.0
TO COKE OVENS 0 0 0 0 Coal Tower-3 0 2900 Burden ratio 3.83 4 3.80 3.70 3.73 3.71 Liquid Steel Production -(t) (for the month) 0 113940 100650 0 0.0
Coking Coal 0 13700 0 175700 CCP Month Plan Prodn(t) 0 0 0 Grade SIZE Plan Aimed Grade SIZE Plan Aimed
TO TPP 0 0 0 0 Ondate Todate No of charges 137 143 280 2013 2200 4213 FE500D LMMM 40 27 EN8D 150X150 10 10
BC-crushed 0 0 1950 0 32020 Benzene ** 0 0 0 0 0 0 DHSCRM LMMM 10 11 FE500D 150X150 10 6
MCC 0 0 0 0 0 Toulene ** 0 0 Consumption (Kg/thm) 0 0 0 0 2830 MMSM 15 22 SMS-2 EN8D 200X200 7
SMS-1
IBC 0 0 1300 0 12042 SOL 110 ** 0 0 FUEL RATE 538 542 540 549 544 546 FE500DW LMMM 4 2830 200X200 10 22
TO RMB 0 0 0 LSO ** 0 0 0 ROUND 430
I/O Fines 0 8300 0 108350 S P 0 0 0 BF COKE (Dry) 380 394 387 406 406 406 0
BF Dol 0 800 0 11405 0 M/C-1 M/C-2 M/C-3 0 0 0 TOTAL 0 65 64 0 TOTAL 0 37 38
BF L/S 0 100 0 3535 Run Time - Hrs/Day 0 0 NUT COKE (Dry) 42 37 40 32 31 32 CCD-1 M/C Closures Heats cast(nos) Heats/ CCD-2 M/C Closures Heats cast (nos) Heats/
CRMP Returns 0 550 0 6795 Ondate 20.3 19.0 21.0 0 0 0 CCM Ondate /Todate Ondate Todate Seq CCM Ondate / Todate On Date Todate Seq
Sand 0 0 0 0 Till Date 19.1 16.1 19.6 FUEL INJCTN (Dry) 116 111 113 112 106 109 1 1 / 15 5 114 7.6 1 1 / 18 10 182 10.1
Qtz( f ) 0 0 0 0 Prodn rate - t/hr 0.00 0.00 0 0 0 2 1 / 11 17 131 11.9 2 1 / 18 6 180 10.0
Oli Flux 0 0 0 Ondate 451 348 487 SINTER 1230 1256 1243 1226 1268 1248 3 0 / 13 17 120 9.2 3 1 / 16 22 267 16.7
TO RMPP 0 0 0 Till Date 421 322 477 0 0 0 4 1 / 08 13 129 16.1 4 0 / 07 0 41 5.9
I/O Fines 0 10400 0 110150 0 RMB RMPP 0 SZD ORE 396 379 387 402 372 386 5 1 / 11 10 141 12.8 0 0 0 0 0
BF Dolo 0 990 0 9230 Met waste consumpn- t 0.0 0.0 6 0 / 08 2 139 17.4 0 0 0 0 0
BF L/S 0 100 0 2755 Ondate 580 1040 PELLETS 0 0 0 0 0 0 Total :: 4 / 66 64 774 11.7 Total :: 3 / 59 38 670 11.4
CRMP Returns 0 1450 0 9160 Till Date 9545 7762 Heats Cast in L-size 42 540 0 Heats Cast in 150 size 16 362 0.0
Sand 0 0 0 400 LD Slag Consumpn - t 0.00 0.00 0 SLAG RATE 333 340 ** 324 335 332 Heats Cast in M-size 22 234 0 Heats Cast in 200 size 22 267 0
Qtz( f ) 0 0 0 0 Ondate 310 280 0 O2 ENRICHMENT (%) 4.2 4 ** 3.6 4.5 ** 0 0 Heats Cast in 430 Round 0 41 0.0
Oli Flux 0 0 0 0 Till Date 4355 1799 0 (at 6.00am) 0 0 0 0 0 Conv-A Conv-B Conv-C 0 Conv-D Conv-E Conv-F
TO SINTER M/Cs 0 0 0 Lime fines Consumpn - t RMB M/C-3 0 0 0 0 0 Heats made on Date 20 21 23 Heats made on Date 27 11 0
Basemix to Sinter M/C-1&2 0 15600 0 210200 Ondate 176 396 HOT BLAST TEMP 1050 1050 ** 1050 1048 ** Lining life -Cur 0 2850 1843 179 Lining life -Current. 4086 804 U/MECH
Basemix to Sinter M/C-3 0 10500 0 167100 Till Date 2852 3325 (at 6.00am) 0 0 0 0 -Previous. 6701 4984 6753 0 -Previous. 3318 6387 4520
TO BF 0 0 0 % SLIME Consumn at SP( For the month) - 29.2 BHS STOCK - SINTER 2070 2150 0 -Best Life. 7847 7777 6753 0 -Best Life. 4739 6387 4520
Sized ore to BF-1&2 0 5750 0 92400 Met waste consumpn (Kg / t of Ch. Sinter)- 60.2 (at 6.00 am) -Coke 880 850 0 0 Ondate Todate 0 0 0 Ondate Todate
Sized ore to BF-3 0 0 0 0 BMY-1 - Basemix 98600 -Szd ore 1480 1330 0 Heats Recycled-Occ Full 0 8 Heats Recycled-Occ Full 0 1
Yard Sinter to BF 0 0 0 23750 - Sinter in Yard ( Sinter plan 45800 -Pellets 0 0 0 0 0 Partial 0 1 0 0 Partial 0 0
BF Coke to BF 0 0 0 750 BMY-2 - Basemix 60100 0 0 0 0 0 Heats Recycled-Tons Full 0 1000 Heats Recycled-Tons Full 0 150
Nut Coke to BF-1&2 0 200 0 2410 0 - Sinter in Bins(Dischagable 2350 0 Partial 0 78 0 0 Partial 0 0
Iron Ore Pellets to BF-1&2 0 0 0 0 Heat Recovery from on date 0.00 0 PCM Pouring - shift wise 0 0 0 0 Pooled Iron Pour 0 Tons Poured in EC(Full) -Occ 0 1 Poured in EC(Full) -Occ 0 1
Iron Ore Pellets to BF-3 0 0 0 0 SHRPP -Mcal/t of Sinter Avg/day 0.0 0 ( Nos ) On date 0 0 0 0 On date 0 0 0 -Tons 0 140 0 -Tons 0 150
Coal to BF for Injection 0 2470 0 30684 0 On date Till Date Till date 9 0 0 0 Till date 0 855 Poured in EC(Tot) -Tons 369 4108 Poured in EC(Tot) -Tons 76 1318
TO CRMP 0 0 0 LIME fines to Open Yard (t) 0 0 MILLS 0 0 0 0 0 0 0 0 0 0 0
SMS L/S to CRMP 0 0 2500 0 49240 Billet Mill Bar Mill WRM-1 WRM-2 MMSM SBM STM
SMS Dolo to CRMP 590 0 12835 CRMP Prodn (t) On date Till Date 0 Ondate Todate Ondate Todate Ondate Todate Ondate Todate Ondate Todate Ondate Todate Ondate Todate
TO SMS 0 0 0 0 FK-1 Lime 167 3431 Rolled Nos 1710 19475 2268 26247 2365 31197 687 12553 839 11509 680 12549 466 8434
Sized Ore to SMS-1 0 0 0 0 FK-2 Dolo 238 3540 Nos
Production 5130 58413 2268 26223 2361 31136 687 12529 839 11488 677 12517 466 8420
Sized Ore to SMS-2 0 500 0 1590 FK-3 Lime 249 3365 Production Tons 6330 72082 2747 31756 2857 37675 1425 25985 2228 30702 1395 25804 1673 30136
Dolo to SMS-1 0 0 0 0 FK-4 Lime 249 3630 Running Time hrs 19.25 218.92 19.25 207.08 15.91 215.81 10.75 236.57 15.50 172.84 19 219 16 228
Dolo to SMS-2 0 0 0 250 FK-5 Lime 216 3432 t/hr
Rolling Rate 329 329 143 153 180 175 133 110 144 178 75 118 106 132
Sinter to SMS-1 0 0 0 730 SK-1 Lime 460 7370 Blms rolled -250 Size Nos 0 0 0 0 0 0 0 0 839 11509 0 0 0 0
Sinter to SMS-2 0 0 0 0 SK-2 Lime 0 0 Blms rolled -200 Size Nos 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0
MATERIAL SHIFTING PRODN (t) Briquettes. 29.3 592 Production - Coil Tons 0.00 0.0 0.00 0 0 0 0 0 0 0 0 4869 0
I/O Fines Shifting from MUY 0 0 STOCK CTF at CRMP 793.0 ** Production -Straight Tons 0.00 0.0 0.00 0.00 0 0 0 0 0 0 1395 20934 0
CRMP returns Shifting to RMHP 725 0 12100 Lime at SMS- 360 ** Yield % 97.42 97.40 98.14 98.05 97.89 97.86 97.74 97.55 95.61 96.06 96.65 96.90 96.69 96.24
LD Slag Shifting to RMB 610 0 5452 Lime at SMS- 150 ** Total SD days 0.00 1.50 0.00 1.50 0.00 0.90 0.40 1.26 0.00 0.79 0.000 1.39 0.00 1.19
Metallurgical Waste Shifting 0 0 3450 0.0 Section rolled mm 25R 12R 5.5P/SD/7P MC150 20R RND80
Production Planning & Monitoring PAGE NO: 5
Quality & Services 15-Dec-22 Vizag Steel's Performance
(All figures are provisional)

QUALITY (%) Aus - EMD TPP Ondate Avg/Day


Hard Non Aus
C.Coals CC Hard CC ISC MCC BF-1 Min Max Last Cast BF-2 Min Max Last Cast BF-3 Min Max Last Cast Item ('000 Ncum/hr) CO gas BF gas LD gas Heat Con-MCal Power Gen - Total MW 220.8 225.6
Hot Hot Hot
21 44 25 10 Metal Si 0.39 0.88 0.40 Metal Si 0.35 0.75 0.43 Metal Si Make 146.2 959.7 63.3 Ondate Todate - CPP-2 MW 81.9 79.5
Mn
MB Stock 1910 1900 1185 1270 Mn 0.07 0.08 0.08 Mn 0.09 0.19 0.11 Distribution - TGs (TPP) MW 118.5 126.4
S
S 0.030 0.050 0.042 S 0.034 0.058 0.039 CO 54.3 53.0 ** 588 588 - BPTS MW 0.0 0.0

Item Content Min Max Avg P 0.09 0.11 0.11 P 0.09 0.11 0.10 P SP-1 4.5 0.0 ** 28.8 30.7 - GETS MW 0.0 0.0

Coal V.M 26.13 27.34 26.58 BF Slag FeO 0.20 0.52 0.28 BF Slag FeO 0.20 0.36 0.21 BF Slag FeO SP-2 1.3 0.0 ** 13 13 - COB4&5 MW 20.4 19.7

T.M 9.0 9.4 9.2 MgO 9.40 9.77 9.40 MgO 9.30 9.81 9.76 MgO BF 3.3 313.0 0.0 461 443 - TRT MW 0.0 0.0

+3 mm 28.00 29.00 28.33 Al2O3 16.68 18.54 17.41 Al2O3 17.20 18.05 17.31 Al2O3 SMS-1 2.8 ** ** 32 37.2 - NEDO MW 0.0 0.0

ASH 10.40 10.81 10.65 Basicity 1.03 1.09 1.04 Basicity 1.00 1.09 1.09 Basicity SMS-2 2.0 ** ** 37 31 - SOLAR MW 0.0 0.0

Coke V.M 0.60 0.62 0.61


Sinter M/C-1&2 Sinter M/C-3 SMS-1 Min Max Billet Mill 17.6 7.5 24.5 461 536 - IMP MW 173.0 164.4

ASH 15.06 15.42 15.22 Min Max Avg Min Max Avg LD SLAG Basicity 3.2 3.6 Bar Mill 0.3 0.2 0.4 19 24 - EXP MW 0.0 0.0

M+40 *** *** NS T.Fe 55.39 55.97 55.73 T.Fe 55.91 56.55 56.28 FeO 15.8 22.2 WRM-1 3.9 1.6 5.5 228 247 - Net Impo MW 173.0 164.4

M-10 *** *** NS FeO 10.97 11.22 10.86 FeO 10.71 11.09 10.97 MgO 9.7 13.3 WRM-2 2.7 2.4 2.3 290 228 NEDO-Net generation MW 0.0 0.00

+75/80 mm *** *** NS CaO 9.72 10.02 9.87 CaO 9.27 9.70 9.44 MMSM 4.0 1.4 9.0 352 332 Steam generation t 20369 21408

-20 mm *** *** NS MgO 2.11 2.28 2.21 MgO 1.91 2.06 2.01
SMS-2 Basicity 3.2 3.6 SBM 2.6 2.2 2.4 286 304 Coal Consumption t 2010 39641

CRI: NS CSR: NS SiO2 5.90 6.43 6.15 SiO2 5.75 6.10 5.91 LD SLAG FeO 19.3 23.3 STM 2.9 2.8 3 269 287 Oil Consumption KL 0.0 0
Basemix Bed Details Al2O3 2.56 2.73 2.63 Al2O3 2.64 2.80 2.72 MgO 8.3 12.5 TPP 28.3 390 0 789 802 Oil(FO+HSD) Stock KL 346 **

RMB RMPP MnO 0.05 0.11 0.10 MnO 0.08 0.11 0.09 On Date Till Date CPP-2 8.1 175 16.6 700 733
Stacking
A F Basicity 1.56 1.67 1.61 Basicity 1.57 1.62 1.60 Heats Treated at HMDP ( Nos) 0 ` CRMP-2 4.3 5.6 0.0 1205 976 FeedWater Temp - (Deg.C) -
Blr-1 Blr-2 Blr-3 Blr-4 Blr-5 Blr-6
Span 202-352 40-240 Avail. Lime 3.59 3.95 3.73 Avail. Lime 3.43 3.60 3.53 Bleeding 0 5 ** ** **

%Pile made 25 31 -10mm to + 5 mm -10mm to + 5 mm Heats Treated at RH Degasser(N 0


29
CV 4219 886 1787 ** ** 135 141 149 113

Reclaiming B E -5 mm -5 mm BC stocks (t) ISB 2060


KBR-1
Span 240-340 240-340
WMD Level -E.C. 21.1 ASP Blr-1 Blr-2 Blr-3 Blr-4 Blr-5 Blr-6

Recl. Point 293 309 KBR-1 Intake - MGD 30.3 -W.C. 21.1 Prodn ('000 Ncum/Hr) Stock (t) 480 0 700 0 640 600

KBR-2 Intake - MGD 0.0 KBR-2 Level 21.2 Oxygen 79 Liq.Oxygen 2514 C P P-2 t Ondate Todate

Total Intake 30.3 KBR Stock -No of days 100.0 Nitrogen 142 Liq.Nitrogen 4957 Steam generation 7506 106830

-Avg/Day 35.6 Consumption Rate - Cum/tcs 2.4 Liq.Argon 453 Blr-1 195 **

Blr-2 195 **

Production Planning & Monitoring PAGE NO: 6


Delay Date Shop CodShop From Upto Durn Eqpt
15-12-2022 01 CHP 3.20 4.00 0.40 SCR
15-12-2022 01 CHP 22.00 5.30 7.30 GPL-1
15-12-2022 01 CHP 13.15 6.00 16.45 CT-2
15-12-2022 01 CHP 19.40 6.00 10.20 CT-1
15-12-2022 01 CHP 0.30 SCR
15-12-2022 01 CHP 0.40 SCR
15-12-2022 01 CHP 0.40 SCR
15-12-2022 01 CHP 17.05 18.35 1.30 STKR
15-12-2022 01 CHP 11.25 12.00 0.35 SCR
15-12-2022 01 CHP 11.00 11.25 0.25 SCR
15-12-2022 01 CHP 2.00 GPL-2
15-12-2022 01 CHP 1.30 CT-2
15-12-2022 01 CHP 7.30 8.05 0.35 CT-2
15-12-2022 01 CHP 11.30 12.00 0.30 CT-1
15-12-2022 01 CHP 6.00 7.00 1.00 CT-1
15-12-2022 01 CHP 6.00 11.00 5.00 GPL-2
15-12-2022 02 O&F 0.45 1.30 0.45 LOCP-2
15-12-2022 02 O&F 1.30 2.50 1.20 LOCP-2
15-12-2022 02 O&F 3.40 4.10 0.30 LOCP-2
15-12-2022 02 O&F 4.30 6.00 1.30 OT-2
15-12-2022 02 O&F 22.00 6.00 8.00 LOCP
15-12-2022 02 O&F 3.40 6.00 2.20 OT-5
15-12-2022 02 O&F 4.00 6.00 2.00 OT-1
15-12-2022 02 O&F 2.45 3.50 1.05 OT-4
15-12-2022 02 O&F 1.00 1.40 0.40 OT-5
15-12-2022 02 O&F 23.50 0.40 0.50 OT-5
15-12-2022 02 O&F 0.45 OT-5
15-12-2022 02 O&F 22.00 22.30 0.30 OT-5
15-12-2022 02 O&F 1.00 2.00 1.00 OT-4
15-12-2022 02 O&F 0.40 OT-4
15-12-2022 02 O&F 22.00 22.50 0.50 OT-4
15-12-2022 02 O&F 0.50 OT-2
15-12-2022 02 O&F 0.50 OT-2
15-12-2022 02 O&F 23.45 0.15 OT-2
15-12-2022 02 O&F 22.00 22.30 0.30 OT-2
15-12-2022 02 O&F 0.25 OT-1
15-12-2022 02 O&F 1.30 2.00 0.30 OT-1
15-12-2022 02 O&F 0.15 0.30 0.15 OT-1
15-12-2022 02 O&F 23.40 0.20 OT-1
15-12-2022 02 O&F 19.50 21.00 1.10 OT-2
15-12-2022 02 O&F 10.45 12.45 2.00
15-12-2022 02 O&F 11.00 18.50 7.50 OT-5
15-12-2022 02 O&F 10.00 19.45 9.45
15-12-2022 02 O&F 10.00 17.30 7.30 BRC
15-12-2022 02 O&F 10.00 17.30 7.30
15-12-2022 02 O&F 10.00 19.45 9.45
15-12-2022 02 O&F 17.30 20.15 2.45 LOCP-2
15-12-2022 02 O&F 17.30 20.15 2.45 LOCP
15-12-2022 02 O&F 18.50 19.35 0.45 OT-5
15-12-2022 02 O&F 18.25 19.30 1.05 OT-4
15-12-2022 02 O&F 19.50 20.50 1.00 OT-1
15-12-2022 02 O&F 13.50 14.30 0.40 OT-1
15-12-2022 02 O&F 13.30 13.50 0.20 OT-1
15-12-2022 02 O&F 6.00 18.25 12.25 OT-4
15-12-2022 02 O&F 6.00 6.00 24.00 OT-3
15-12-2022 02 O&F 6.00 19.50 13.50 OT-1
15-12-2022 02 O&F 11.15 13.15 2.00 LOCP-2
15-12-2022 02 O&F 11.30 12.30 1.00 OT-2
15-12-2022 03 COCCP 1.15 BATTERY-4
15-12-2022 03 COCCP 6.00 BATTERY-3
15-12-2022 03 COCCP 0.45 BATTERY-5
15-12-2022 03 COCCP 3.30 BATTERY-4
15-12-2022 03 COCCP 2.00 BATTERY-3
15-12-2022 03 COCCP 1.15 BATTERY-2
15-12-2022 03 COCCP 1.00 BATTERY-1
15-12-2022 03 COCCP 23.00 6.00 7.00
15-12-2022 03 COCCP 14.00 15.30 1.30 CPP
15-12-2022 03 COCCP 6.00 6.00 24.00
15-12-2022 03 COCCP 6.00 6.00 24.00
15-12-2022 03 COCCP 6.00 6.00 24.00
15-12-2022 03 COCCP 6.00 6.00 24.00
15-12-2022 03 COCCP 6.00 6.00 24.00
15-12-2022 04 SP 23.00 23.20 0.20 M/C-2
15-12-2022 04 SP 0.20 0.20 M/C-2
15-12-2022 04 SP 0.20 M/C-2
15-12-2022 04 SP 0.20 M/C-1
15-12-2022 04 SP 0.20 0.20 M/C-1
15-12-2022 04 SP 22.30 22.50 0.20 M/C-1
15-12-2022 04 SP 0.40 M/C-3
15-12-2022 04 SP 1.00 RMB
15-12-2022 04 SP 15.00 15.30 0.30 M/C-3
15-12-2022 04 SP 16.40 17.20 0.40 M/C-3
15-12-2022 04 SP 20.10 20.30 0.20 M/C-2
15-12-2022 04 SP 20.10 20.30 0.20 M/C-1
15-12-2022 04 SP 16.10 16.30 0.20 M/C-2
15-12-2022 04 SP 0.40 M/C-1
15-12-2022 04 SP 15.10 15.30 0.20 M/C-2
15-12-2022 04 SP 15.10 15.30 0.20 M/C-1
15-12-2022 04 SP 6.00 16.30 10.30 BRC
15-12-2022 04 SP 6.00 6.00 24.00
15-12-2022 04 SP 6.00 6.00 24.00
15-12-2022 04 SP 6.00 6.00 24.00
15-12-2022 04 SP 11.30 12.10 0.40 M/C-3
15-12-2022 04 SP 7.30 8.00 0.30 M/C-3
15-12-2022 04 SP 0.30 M/C-2
15-12-2022 04 SP 11.30 13.30 2.00 M/C-2
15-12-2022 04 SP 6.10 6.40 0.30 M/C-2
15-12-2022 04 SP 0.20 M/C-1
15-12-2022 04 SP 0.30 M/C-1
15-12-2022 04 SP 6.00 6.30 0.30 M/C-1
15-12-2022 04 SP 2.00 RMB
15-12-2022 04 SP 1.00 RMB
15-12-2022 05 BF 6.00 6.00 24.00 F/C-3
15-12-2022 06 SMS 9.00 1.40 16.40 CCM-1
15-12-2022 06 SMS 4.55 4.55 CCM-6
15-12-2022 06 SMS 0.30 CONV-B
15-12-2022 06 SMS 4.15 6.00 1.45 CCM-2
15-12-2022 06 SMS 2.40 6.00 3.20 CCM-4
15-12-2022 06 SMS 0.20 3.20 3.00 CCM-5
15-12-2022 06 SMS 23.30 0.30 CCM-6
15-12-2022 06 SMS 9.00 23.30 14.30 CCM-6
15-12-2022 06 SMS 6.00 9.00 3.00 CCM-6
15-12-2022 06 SMS 6.00 8.40 2.40 CCM-5
15-12-2022 06 SMS 12.00 13.00 1.00 CONV-A
15-12-2022 06 SMS 8.00 9.00 1.00 CCM-1
15-12-2022 07 LMMM 0.30 BAR MILL
15-12-2022 07 LMMM 0.30 BAR MILL
15-12-2022 07 LMMM 0.10 BAR MILL
15-12-2022 07 LMMM 0.15 BAR MILL
15-12-2022 07 LMMM 0.15 BAR MILL
15-12-2022 07 LMMM 0.20 BAR MILL
15-12-2022 07 LMMM 0.20 BILLET MIL
15-12-2022 07 LMMM 0.20 BILLET MIL
15-12-2022 07 LMMM 0.45 BAR MILL
15-12-2022 07 LMMM 1.00 BAR MILL
15-12-2022 07 LMMM 0.15 BAR MILL
15-12-2022 07 LMMM 0.15 BAR MILL
15-12-2022 07 LMMM 1.00 BILLET MIL
15-12-2022 07 LMMM 0.40 BILLET MIL
15-12-2022 07 LMMM 0.20 BILLET MIL
15-12-2022 07 LMMM 0.10 BILLET MIL
15-12-2022 07 LMMM 0.20 BILLET MIL
15-12-2022 07 LMMM 0.20 BILLET MIL
15-12-2022 07 LMMM 8.00 8.30 0.30 BAR MILL
15-12-2022 07 LMMM 9.00 9.30 0.30 BAR MILL
15-12-2022 07 LMMM 0.15 BAR MILL
15-12-2022 07 LMMM 0.15 BAR MILL
15-12-2022 07 LMMM 0.10 BILLET MIL
15-12-2022 07 LMMM 0.10 BILLET MIL
15-12-2022 07 LMMM 0.10 BILLET MIL
15-12-2022 07 LMMM 0.20 BILLET MIL
15-12-2022 07 LMMM 0.10 BILLET MIL
15-12-2022 07 LMMM 0.15 BILLET MIL
15-12-2022 08 WRM 2.10 2.50 0.40 MILL
15-12-2022 08 WRM 0.20 MILL
15-12-2022 08 WRM 0.30 MILL
15-12-2022 08 WRM 0.10 MILL
15-12-2022 08 WRM 0.30 MILL
15-12-2022 08 WRM 0.25 MILL
15-12-2022 08 WRM 0.15 MILL
15-12-2022 08 WRM 14.25 15.05 0.40 MILL
15-12-2022 08 WRM 0.10 MILL
15-12-2022 08 WRM 1.00 MILL
15-12-2022 08 WRM 0.30 MILL
15-12-2022 08 WRM 0.10 MILL
15-12-2022 08 WRM 0.15 MILL
15-12-2022 08 WRM 7.00 9.00 2.00 MILL
15-12-2022 08 WRM 0.20 MILL
15-12-2022 08 WRM 0.30 MILL
15-12-2022 08 WRM 12.10 12.25 0.15 MILL
15-12-2022 08 WRM 6.20 6.30 0.10 MILL
15-12-2022 08 WRM 6.05 6.20 0.15 MILL
15-12-2022 08 WRM 1.30 MILL
15-12-2022 09 MMSM 0.15 MILL
15-12-2022 09 MMSM 0.20 MILL
15-12-2022 09 MMSM 0.10 MILL
15-12-2022 09 MMSM 0.20 MILL
15-12-2022 09 MMSM 0.15 MILL
15-12-2022 09 MMSM 0.10 MILL
15-12-2022 09 MMSM 0.15 MILL
15-12-2022 09 MMSM 0.15 MILL
15-12-2022 09 MMSM 0.20 MILL
15-12-2022 09 MMSM 0.20 MILL
15-12-2022 09 MMSM 1.10 MILL
15-12-2022 09 MMSM 0.20 MILL
15-12-2022 09 MMSM 2.30 MILL
15-12-2022 09 MMSM 0.20 MILL
15-12-2022 09 MMSM 1.30 MILL
15-12-2022 10 TPP 6.00 6.00 24.00
15-12-2022 10 TPP 6.00 6.00 24.00 TRT
15-12-2022 10 TPP 6.00 6.00 24.00 TB-2
15-12-2022 10 TPP 6.00 6.00 24.00 NEDO
15-12-2022 10 TPP 6.00 6.00 24.00 GETS
15-12-2022 10 TPP 6.00 6.00 24.00 BPTS
15-12-2022 10 TPP 6.00 6.00 24.00 BOILER-4
15-12-2022 10 TPP 6.00 6.00 24.00 BOILER-2
15-12-2022 12 CH 6.00 6.00 24.00 CH-3
15-12-2022 14 DNW 6.00 6.00 24.00
15-12-2022 14 DNW 6.00 6.00 24.00
15-12-2022 14 DNW 6.00 6.00 24.00 LBSS-5
15-12-2022 14 DNW 6.00 6.00 24.00 LBSS-3
15-12-2022 15 CRMP 10.00 23.00 13.00
15-12-2022 15 CRMP 1.00 FK-5
15-12-2022 15 CRMP 6.50 10.30 3.40 FK-1
15-12-2022 16 SMS2 6.00 6.00 CCM-2
15-12-2022 16 SMS2 16.50 7.10 CCM-2
15-12-2022 16 SMS2 7.00 6.00 23.00 CCM-4
15-12-2022 16 SMS2 13.00 22.00 9.00 CCM-1
15-12-2022 16 SMS2 8.30 20.30 12.00 CONV-E
15-12-2022 16 SMS2 6.00 6.00 24.00 CONV-F
15-12-2022 16 SMS2 6.00 7.00 1.00 CCM-4
15-12-2022 16 SMS2 7.30 10.05 2.35 CCM-3
15-12-2022 16 SMS2 10.10 13.00 2.50 CCM-1
15-12-2022 18 WRM2 5.00 5.30 0.30 MILL
15-12-2022 18 WRM2 1.30 1.50 0.20 MILL
15-12-2022 18 WRM2 0.10 MILL
15-12-2022 18 WRM2 0.30 MILL
15-12-2022 18 WRM2 0.35 MILL
15-12-2022 18 WRM2 0.40 MILL
15-12-2022 18 WRM2 0.10 MILL
15-12-2022 18 WRM2 0.15 MILL
15-12-2022 18 WRM2 20.00 20.15 0.15 MILL
15-12-2022 18 WRM2 0.10 MILL
15-12-2022 18 WRM2 8.30 8.55 0.25 MILL
15-12-2022 18 WRM2 10.20 20.00 9.40 MILL
15-12-2022 19 SBM 0.10 MILL
15-12-2022 19 SBM 0.10 MILL
15-12-2022 19 SBM 0.20 MILL
15-12-2022 19 SBM 0.10 MILL
15-12-2022 19 SBM 0.40 MILL
15-12-2022 19 SBM 0.15 MILL
15-12-2022 19 SBM 0.15 MILL
15-12-2022 19 SBM 0.10 MILL
15-12-2022 19 SBM 0.30 MILL
15-12-2022 19 SBM 0.20 MILL
15-12-2022 19 SBM 2.20 MILL
15-12-2022 20 STM 0.30 MILL
15-12-2022 20 STM 0.45 MILL
15-12-2022 20 STM 0.20 MILL
15-12-2022 20 STM 3.00 3.20 0.20 MILL
15-12-2022 20 STM 0.10 MILL
15-12-2022 20 STM 0.10 MILL
15-12-2022 20 STM 0.10 MILL
15-12-2022 20 STM 0.15 MILL
15-12-2022 20 STM 0.10 MILL
15-12-2022 20 STM 0.10 MILL
15-12-2022 20 STM 0.30 MILL
15-12-2022 20 STM 0.20 MILL
15-12-2022 20 STM 0.15 MILL
15-12-2022 20 STM 0.15 MILL
15-12-2022 20 STM 0.30 MILL
15-12-2022 20 STM 15.30 15.50 0.20 MILL
15-12-2022 20 STM 0.20 MILL
15-12-2022 20 STM 0.15 MILL
15-12-2022 20 STM 0.30 MILL
15-12-2022 20 STM 0.20 MILL
15-12-2022 20 STM 0.20 MILL
15-12-2022 20 STM 1.15 MILL
Sub Eqpt agency Descr Contd Material Rake
CC-49 O JAMMING N ICC
MIS WAGON LOADING-GPLN ICC
ID IDLE C
ID IDLE C
CC-42 O CHUTE JAMMING N ICC
M ON CC-35 BUCKET WHN ICC
E ON CC-35 BUCKET WHN ICC
GPL-2 M CC-111 B/CONV OVERN ICC
O STREAM CHG FOR DI N ICC
CC-50 O JAMMING N ICC
MIS TELE STACKING N ICC
O GRILL JAMMING N BC
CC-32 M J/PATCHING N BC
S WAGON GROUPING N MCC
O STREAM CLEANING N BC
MIS WAGON LOADING N ICC
O FLAP GATE CHG N I-O-L
CO-17A E ZSS PROB N I-O-L
O CRUSHER BUNKERS FN I-O-L
ID IDLE C
CO-45 M EDGE THROUGH CUT C I-O-L
ID IDLE C
ID IDLE N
S WAGON GROUPING N I-O-L
OC-7A M BELT SWAY N I-O-F
OC-2A O CHUTE JAMMING N I-O-F
O HOPPER JAMMING N I-O-F
O STREAM SETTING N I-O-F
O GRILL JAMMING-BIG N I-O-F
O HOPPER CLEANING N I-O-F
O STREAM SETTING N I-O-F
O HOPPER CLEANING N SMS-LS
CO-24,2A M BRS ACTED-CONV OFN SMS-LS
S POINT CHG -TRAFFIC N SMS-LS
O STREAM SETTING N SMS-LS
O STREAM CHG N I-O-F
S WAGON DECOUPLINGN I-O-F
S PTY CHG-TRAFFIC N I-O-F
CO-21 M BRS ACTED-CONV OFN I-O-F
S WAGON GROUPING N SMS-LS
CRUSHER-2A SD U/SD N
ID IDLE N
TB STKR SD ON CO-19 U/SD N
SD ON CO-28 U/SD N
CO-16,17A SD U/SD N
CO-7,10,13 SD U/SD N
TB STKR M ON CO-20 LUFFING P N I-O-L
TB STKR M ON CO-20 LUFFING P N I-O-L
C RAKE COUPLING N I-O-F
C RAKE COUPLING N I-O-F
C RAKE COUPLING N I-O-F
PC-2 E TRIPPED N SMS-LS
C RAKE COUPLING N SMS-LS
ID IDLE N
CR U/CR C
ID IDLE N
CO-12A M JOINT PATCHING N
S WAGON GROUPING N SLIME
SD PUSHINGS REGULATEN
SD PUSHINGS REGULATEN
MS PUSHINGS REG-LESSN
MS PUSHINGS REG-LESSN
MS PUSHINGS REG-LESSN
MS PUSHINGS REG-LESSN
MS PUSHINGS REG-LESSN
LOCO-7 E RF SIGINAL PROB C
SCRN-79 O CLEANING N
CHAMBER-8 SD U/SD FOR BOILER CE C
CHAMBER-13 SD BRICK LINING DAMAGC
CHAMBER-11 SD BOILER CERTIFICATI C
BENZOL PLAN SD STREAM-2 U/SD(LESS CJ
BENZOL PLAN SD STREAM-1 U/SD-LESSC
M PALLET CHG N
MIS BF CONVY STOPPED N
S PD COAL CONTAMINAT
N
S PD COAL CONTAMINAT
N
MIS BF CONV STOPPED N
OA-2 C R/CHUTE INSP N
S PD -COAL CONTAMINAN
TB STKR E LT PROB N
I NOD-DRUM WATER FLN
C-16 M BELT JOINT PATCHIN N
MIS BF CONVY STOPPED N
MIS BF CONVY STOPPED N
M PALLET CHG N
M TWO PALLETS CHG N
MIS BF CONVY STOPPED N
MIS BF CONVY STOPPED N
BED-B E BUCKET WHEEL-2 MON
H CRUSH(RMPP
SD U/SD C
C CRUS-5 M ROLLS DAMAGED C
C CRUS-2,7 M ROLLS NOT AVAILABLC
I NODULISER DRUM WAN
C-20 M R/CHUTE IMPACT PA N
S SLOW SPPEED- COALN
M HOT SCREEN-CARDENN
BRC-B E B/MIX SHORTAGE-BR N
M PALLET CHG N
S SLOW SPEED -COAL N
BRC-B E B/MIX SHORTAGE-BR N
M LESS NO OF COKE C N
TB STKR M PCRD GUIDE ADJUST N
MIS POOR COKE STOCK-FC
ID IDLE N
ID IDLE N
O MOUTH JAM, BODY JAN
O U/P(S-2 HEAVY RUNN C
O U/P(LOW TEMP -ALL C
O U/P(HEAT DELAY-CONN
O U/P AFTER SD N
SD U/SD FOR RADIAL PO N
O U/P(LOW TEMP-ALL S N
ID IDLE N
O TH CHG N
O U/P(CHOKING) N
LINE-2 C S-22 PASS CHG N 25R
LINE-1 C S-22 PASS CHG N 25R
M ROUGHING TRAIN MON 25R
MIS BILLET SUPPLY DELA N 25R
C HEAT CHG N 25R
C MILL CHECKING N 25R
C MILL CHKG N
C HEAT CHG N
MIS SUPPLY DELAY -BDM N 25R
C CHANGE OVER FE550N 25R
C HEAT CHG N 25R
C MILL CHECKING N 25R
MS BLOOM SHORTAGE N
S-3 C PASS CHANGING N
F/C-2 M ZONE-6 GAS V/V PRO N
F/C-1 M CELLAR -13 PUMP PR N
F/C-1 E CELLAR-13 PUMP PR N
C MILL CHKG N
LINE-2 C S-22 PASS CHG N 25R
LINE-1 C S-22 PASS CHG N 25R
C HEAT CHG N 25R
C MILL CHECKING N 25R
F/C-1 M ZONE-3 AIR V/V PRO N
F/C-2 M ZONE-6 GAS V/V PRO N
M DESCALER NOT WOR N
F/C-1 MS HOLDING FOR BAR MIN
C HEAT CHG N
C MILL CHECKING N
LINE-3 C S-18,19 RING CHG N 12R
O TRIMMING DELAY N 12R
S S-4/3,4/2 GUIDE CHG N 12R
C FB & IB CHKG N 12R
C NO HOOKS - 2 COIL U/N 12R
C CFC JAM N 12R
C MILL CHECKING N 12R
LINE-4 C RING CHANGE N 12R
C F/C SOAKING N 12R
C COIL SATURATION N 12R
C CFC JAM N 12R
S-11/11 S E/GUIDE JAM - ROLLEN 12R
C MILL CHKG N 12R
LINE-3 O COIL FALLEN AT CELLN 12R
C NO HOOKS- 2COILS N 12R
C CFC JAM N 12R
C RM SHEAR COBBLE AT
N 12R
C IM PASS BURNING N 12R
C MILL CHECKING N 12R
C EXTRA LOOPS TRIMMN 12r
MS SHORT PIECE GENERN MC150
C STATIONARY SAW BL N MC150
RHS C MS-2 BLADE CHG N MC150
RHS O BAR STUCKUP AT BA N MC150
LHS M SEC-2 TYING M/C ST N MC150
LHS C MS-2 BLADE CHG N MC150
S-2 O DRIVE SIDE WATER HN MC150
S-7 O D/GUIDE TIGHTENINGN MC150
S-15,17 O LOCK RING TIGHTENI N MC150
LHS E PILING-4 VERTICAL C N MC150
C MILL CHECKING AND N MC150
O C/BED LEFTSIDE BAR N MC150
MS SINGLE F/C ROLLIN N MC150
C SAMPLE CHKG & ADJ N MC150
C S-11 PASS CHG, S-16 N MC150
GSB-1 O SEC-1 BREAKER FLA C
S HAND TRIPPED - BF3 C
ID IDLE C
S TRIPPED - LOW STEA C
TG-1,2 S HAND TRIPPED LBSS-5
C
TG-1,2 S HAND TRIPPED C
SD HAND TRIPPED - BU C
SD HAND TRIPPED-CAPITC
S TRIPPED - LBSS-3 Z C
TR-3 E LBSS-3 - TR-3 TRIPPE C
3LBDS-5 E PANEL-11 FLASH OVEC
SD TRANSFORMER 4 U/S C
TR-2 E TRIPPED C
CO-89 M SNAPPED N
E DRIVES TRIPPED 5 TI N
O GRILL JAMMING N
ID IDLE C
O U/P(PLANNED CLOSU N
ID IDLE C
ID IDLE N
SD U/MCR FOR GCP JOB N
SD U/SD FOR RELINING C
O U/P(PLANNED CLOSU N
O U/P(PLANNED CLOSU N
O U/P(PLANNED CLOSU N
LINE-B E RSM PROXY CHG N 7P
LINE-B O CFC JAM N 7P
C HEAT CHG N 7P
C MILL CHECKING N 7P
O TRIMMING DELAY N 7P
C STRAP CHG N 7P
M CKT-1 OVERLOAD N 7P
C GRADE CHNG N 7P
C MILL STABILISATION N 7P
C HEAT CHG N 5.5P
MS F/C CYCLE GAP-BLT N 5.5P
SD U/SD FOR WEEKLY MAN 5.5p
C MILL CHECKING N
O BAR STUCK AT ALIGNN
O BAR PROJECTION ONN
M TAIL EJECTOR PROB N
S-18 C PASS CHG N
O 1ST BAR HEAD BEND N
C HEAT CHG N
S-15 E WATER FEEDBACK P N
S-18 C PASS CHG N
O COBBLE AT S-10 EN N
S-18 O EXIT GUIDE KNOCKE N
M SHEAR-3 AND GUIDE N
SAWAREA M SLIDING DOOR BEARIN
FINISHINGAREC GRADE CHANGE N
FINISHINGAREC SHORT BARS CLEARI N
FINISHINGAREM LINE -2 STRAP MACHI N
FINISHINGAREM POCKET HORIZONTALN
FINISHINGAREE POCKET HORIZONTALN
FINISHINGAREC LINE -2 STRAP MACHI N
FINISHINGAREM CHAIN DERAILED [@LIN
FINISHINGAREM CHAIN DERAILED [@LIN
SAWAREA M DOOR BEARING DAMAG
N
SAWAREA O APRON PLATE DAMAGN
FINISHINGAREM POSITION MISSING [ N
FINISHINGAREM POCKET HORIZONTALN
FINISHINGAREC SHORT BARS CLEARI N
C MILL CHECKING AND N
FINISHINGAREM SIDE WALL PLUMBER N
FINISHINGAREC L2 STRAPPING MACHIN
SAWAREA M EXIT COVER PLATE SH
N
C MILL CHECKING AND N
RMTIMTFMT M GUIDE ROLLS GREAS N
C SHORT BARS CLEARI N
Cum Delay Delay Code Freq Close Dt Eff Durn
0.40 1.00 0.67
7.30 1.00 7.50
16.45 000 1.00 16.75
10.20 000 1.00 10.33
0.30 1.00 0.50
0.40 1.00 0.67
0.40 1.00 0.67
1.30 1.00 1.50
0.35 1.00 0.58
0.25 1.00 0.42
2.00 1.00 2.00
1.30 1.00 1.50
0.35 1.00 0.58
0.30 129 1.00 0.50
1.00 134 1.00 1.00
5.00 1.00 5.00
0.45 1.00 0.75
1.20 1.00 1.33
0.30 1.00 0.50
1.30 000 1.00 1.50
8.00 1.00 8.00
2.20 000 1.00 2.33
2.00 000 1.00 2.00
1.05 1.00 1.08
0.40 1.00 0.67
0.50 1.00 0.83
0.45 2.00 0.75
0.30 1.00 0.50
1.00 1.00 1.00
0.40 2.00 0.67
0.50 1.00 0.83
0.50 134 3.00 0.83
0.50 1.00 0.83
0.15 132 1.00 0.25
0.30 180 1.00 0.50
0.25 2.00 0.42
0.30 1.00 0.50
0.15 1.00 0.25
0.20 1.00 0.33
1.10 129 1.00 1.17
2.00 100 1.00 2.00
7.50 000 1.00 7.83
9.45 100 1.00 9.75
7.30 100 1.00 7.50
7.30 100 1.00 7.50
9.45 100 1.00 9.75
2.45 1.00 2.75
2.45 1.00 2.75
0.45 1.00 0.75
1.05 1.00 1.08
1.00 1.00 1.00
0.40 113 1.00 0.67
0.20 121 1.00 0.33
20.25 000 1.00 12.42
534.45 001 1.00 24.00
28.35 000 1.00 13.83
2.00 1.00 2.00
1.00 129 1.00 1.00
1.15 100 1.00 1.25
6.00 100 1.00 6.00
0.45 1.00 0.75
3.30 1.00 3.50
2.00 1.00 2.00
1.15 1.00 1.25
1.00 1.00 1.00
7.00 1.00 7.00
1.30 1.00 1.50
261.00 100 1.00 24.00
2,520.00 1.00 30/12/2022 24.00
287.00 100 1.00 05-01-2023 24.00
864.00 100 1.00 24.00
3,288.00 100 1.00 24.00
0.20 475 1.00 0.33
0.20 450 1.00 0.33
0.20 1.00 0.33
0.20 1.00 0.33
0.20 1.00 0.33
0.20 1.00 0.33
0.40 1.00 0.67
1.00 452 1.00 1.00
0.30 1.00 0.50
0.40 1.00 0.67
0.20 1.00 0.33
0.20 450 1.00 0.33
0.20 475 1.00 0.33
0.40 1.00 0.67
0.20 450 1.00 0.33
0.20 450 1.00 0.33
10.30 1.00 10.50
1,344.00 100 1.00 24.00
496.00 1.00 24.00
592.00 1.00 24.00
0.40 1.00 0.67
0.30 1.00 0.50
0.30 1.00 0.50
2.00 1.00 2.00
0.30 1.00 0.50
0.20 475 1.00 0.33
0.30 1.00 0.50
0.30 1.00 0.50
2.00 1.00 2.00
1.00 1.00 1.00
7,632.00 550 1.00 24.00
16.40 000 1.00 16.67
4.55 000 1.00 4.92
0.30 618 1.00 0.50
1.45 1.00 1.75
3.20 1.00 3.33
3.00 1.00 3.00
0.30 1.00 0.50
14.30 100 1.00 14.50
4.35 1.00 3.00
6.40 000 1.00 2.67
1.00 628 1.00 1.00
1.00 1.00 1.00
0.30 725 1.00 0.25
0.30 725 1.00 0.25
0.10 1.00 0.17
0.15 1.00 0.25
0.15 718 1.00 0.25
0.20 770 1.00 0.33
0.20 770 1.00 0.33
0.20 718 1.00 0.33
0.45 1.00 0.75
1.00 1.00 1.00
0.15 718 1.00 0.25
0.15 770 1.00 0.25
1.00 1.00 1.00
0.40 725 1.00 0.67
0.20 1.00 0.33
0.10 1.00 0.17
0.20 1.00 0.33
0.20 770 1.00 0.33
0.30 725 1.00 0.25
0.30 725 1.00 0.25
0.15 1.00 0.25
0.15 770 1.00 0.25
0.10 1.00 0.17
0.10 1.00 0.17
0.10 1.00 0.17
0.20 1.00 0.33
0.10 718 1.00 0.17
0.15 1.00 0.25
0.40 1.00 0.17
0.20 803 1.00 0.33
0.30 1.00 0.50
0.10 870 1.00 0.17
0.30 875 1.00 0.50
0.25 808 1.00 0.42
0.15 870 1.00 0.25
0.40 1.00 0.17
0.10 871 1.00 0.17
1.00 1.00 1.00
0.30 1.00 0.50
0.10 710 1.00 0.17
0.15 1.00 0.25
2.00 1.00 0.50
0.20 875 1.00 0.33
0.30 808 1.00 0.50
0.15 1.00 0.25
0.10 825 1.00 0.17
0.15 870 1.00 0.25
1.30 1.00 1.50
0.15 1.00 0.25
0.20 1.00 0.33
0.10 913 1.00 0.17
0.20 1.00 0.33
0.15 1.00 0.25
0.10 913 1.00 0.17
0.15 1.00 0.25
0.15 1.00 0.25
0.20 740 1.00 0.33
0.20 1.00 0.33
1.10 1.00 1.17
0.20 1.00 0.33
2.30 1.00 2.50
0.20 051 1.00 0.33
1.30 1.00 1.50
876.55 1.00 24.00
9,283.25 1.00 24.00
5,601.00 000 1.00 24.00
7,501.15 1.00 24.00
336.00 1.00 16/12/2022 24.00
336.00 1.00 16/12/2022 24.00
45.20 1.00 24.00
1,070.30 100 1.00 01/03/2023 24.00
1,597.35 1.00 24.00
1,606.00 1.00 24.00
1,597.35 1.00 24.00
406.45 100 1.00 24.00
1,597.15 1.00 24.00
13.00 1.00 13.00
1.00 1.00 1.00
3.40 1.00 3.67
6.00 000 1.00 6.00
7.10 1.00 7.17
23.00 000 1.00 23.00
9.00 000 1.00 9.00
12.00 100 1.00 12.00
490.30 625 1.00 16/12/2022 24.00
8.10 1.00 1.00
2.35 1.00 2.58
2.50 1.00 2.83
0.30 1.00 0.25
0.20 1.00 0.17
0.10 855 1.00 0.17
0.30 870 1.00 0.50
0.35 803 1.00 0.58
0.40 1.00 0.67
0.10 812 1.00 0.17
0.15 855 1.00 0.25
0.15 811 1.00 0.25
0.10 855 1.00 0.17
0.25 1.00 0.42
9.40 1.00 9.67
0.10 870 1.00 0.17
0.10 1.00 0.17
0.20 1.00 0.33
0.10 1.00 0.17
0.40 1.00 0.67
0.15 1.00 0.25
0.15 1.00 0.25
0.10 1.00 0.17
0.30 1.00 0.50
0.20 1.00 0.33
2.20 1.00 2.33
0.30 1.00 0.50
0.45 1.00 0.75
0.20 1.00 0.33
0.20 1.00 0.33
0.10 1.00 0.17
0.10 1.00 0.17
0.10 1.00 0.17
0.15 1.00 0.25
0.10 1.00 0.17
0.10 1.00 0.17
0.30 1.00 0.50
0.20 1.00 0.33
0.15 1.00 0.25
0.15 1.00 0.25
0.30 1.00 0.50
0.20 1.00 0.33
0.20 1.00 0.33
0.15 1.00 0.25
0.30 1.00 0.50
0.20 1.00 0.33
0.20 1.00 0.33
1.15 1.00 1.25
Eqpt Run Time Tot Delay ID CR SD O M
CT-1 12.17 11.83 10.33 1.00
CT-2 5.17 18.83 16.75 1.50 0.58
OT-1 4.67 19.33 15.83 0.42 0.33
OT-2 17.92 6.08 1.50 1.33 0.83
OT-3 24.00 24.00
OT-4 6.92 17.08 12.42 2.50
OT-5 10.33 13.67 10.17 2.08 0.67
BATTERY-1 23.00 1.00
BATTERY-2 22.75 1.25
BATTERY-3 16.00 8.00 6.00
BATTERY-4 19.25 4.75 1.25
BATTERY-5 23.25 0.75
M/C-1 20.33 3.67 1.00
M/C-2 19.00 5.00 2.67
M/C-3 21.00 3.00 1.17
RMB 20.00 4.00 3.00
RMPP 24.00
F/C-1 24.00
F/C-2 24.00
F/C-3 24.00
CCM-1 6.33 17.67 16.67 1.00
CCM-2 22.25 1.75 1.75
CCM-3 24.00
CCM-4 20.67 3.33 3.33
CCM-5 18.33 5.67 2.67 3.00
CCM-6 1.08 22.92 4.92 14.50 3.50
CONV-A 23.00 1.00 1.00
CONV-B 23.50 0.50 0.50
CONV-C 24.00
BAR MILL 19.25 4.75 0.17
BILLET MIL 19.25 4.75 1.00
WRM 15.92 8.08 0.83
MMSM 15.50 8.50 1.50 0.25
CCM-1 12.17 11.83 9.00 2.83
CCM-2 10.83 13.17 6.00 7.17
CCM-3 21.42 2.58 2.58
CCM-4 24.00 23.00 1.00
CONV-D 24.00
CONV-E 12.00 12.00 12.00
CONV-F 24.00 24.00
WRM2 10.75 13.25 9.67 0.75 0.17
SBM 18.67 5.33 3.42 0.17
STM 15.83 8.17 0.33 4.08
E I S C MS MIS P IR R
0.50

0.67 0.75 1.33


2.42

1.08 1.08
0.75
1.00
1.25
2.00
3.50
0.75
0.50 0.83 0.33 1.00
0.50 0.83 1.00
1.17 0.67
1.00

24.00

3.58 1.00
0.33 2.08 1.33
0.67 6.58
0.33 3.67 2.75

0.25 2.00 0.42


0.17 1.58
0.17 3.58
W X