Production 2-Feb-23 ### Vizag Steel's Performance

(All figures are provisional) Unit : Tonnes unless otherwise stated


For the month (FEB'23) Actual 2022-2023 (APR-FEB) ('000 t) Best
Item ON DATE Cuml. Avg./ Plan Expected % CPLY Last BEST 2022 - 23 APP Expected % 0 Actual (t) Performan
Plan Act. day '000 t Rate Ful 0 Month FEB (till date) PLAN Rate Ful CPLY 2021 - 22 2020 - 21 ce
(FEB'22) (JAN'22) 0 0 0 Monthly Month Yearly Year

TIPPLING/day-Nos 800 266### 945 473 800 777### 97 461 449.1 646 352 574 361 63 485 488.6 396 665 Mar'20 582 2004-05
SIZED ORE 7500 3000### 8600 4300 210 204### 97 189040 152870 224750 1406990 1889 1602 85 1999 2166335 1806540 226585 Jan'22 2166335 2021-22
OVENS/day-Nos 370 326### 691 346 370 368### 100 290.7 362.1 412 297 314 302 96 381 375.5 296.0 411.5 Feb'21 375.5 2021-22
BASE MIX 28600 27300### 54500 27250 800 798### 100 646800 788900 744900 5970200 7222 6714 93 8169 8929400 7000300 889400 Dec'21 8929400 2021-22
GROSS SINTER 26000 26570### 52065 26033 730 728### 100 602956 716226 714476 5601899 6508 6278 96 7390 8004130 6401961 787091 Jan'22 8004140 2021-22
0
HOT METAL 15000 14500### 29300 14650 419 419### 100 412080 457030 532060 3592337 3934 3982 101 5353 5773650 4681615 579350 Mar'21 5773650 2021-22
PCM POURING 0 ###
0 0 0 1.5 0.0### ** 0 984 86795 44755 92 45 49 90 91995 42995 107463 Mar'93 1100263 1993-94
PIG IRON 0 ###
0 0 0 1.3 0.0### ** 0 854 77032 38828 80 39 48 79 80283 37648 96717 Mar'93 985497 1993-94
HEATS/day-Nos(Total) 99 89### 191 95.5 102 102### 100 97.2 98.5 127.8 76.1 78.1 78 100 104 102.4 82.7 127.8 Feb'21 104.4 2018-19
HEATS/day-Nos-SMS-1 65 59### 124 62 65.0 65### 100 50.8 61.4 79.3 41.5 46.2 43.3 93.8 54.3 54.2 38.8 79.3 Feb'06 68.9 2006-07
HEATS/day-Nos-SMS-2 34 30### 67 34 37.0 37### 100 46.5 37.1 57.3 34.6 31.8 34.8 109.3 49.4 48.2 43.8 57.3 Feb'21 48.2 2021-22
0
LIQUID STEEL (Total) 14444 12998### 27926 13963 417 416### 100 405299 451427 532040 3514694 3818 3903 102 5106 5517526 4491658 565066 Mar'21 5517526 2021-22
LIQUID STEEL-SMS-1 9357 8378### 17608 8804 262 261### 100 209154 269853 317438 1866010 2224 2109 95 2596 2836595 2056912 341227 Mar'10 3606178 2006-07
LIQUID STEEL - SMS-2 0 5087 4620### 10318 5159 155 155### 100 196145 181574 243656 1648684 1594 1794 113 2510 2680931 2434746 266127 Jul'21 2680931 2021-22
CAST BLOOM (Total) 13725 12396### 26645 13323 396 396### 100 387014 432378 510486 3367604 3639 3737 103 4879 5271738 4301807 537174 Mar'21 5271738 2021-22
CAST BLOOM-SMS-1 8818 7915### 16637 8319 247 246### 100 197648 255012 299059 1766508 2097 1996 95 2452 2679940 1947903 322385 Mar'10 3401952 2003-04
CAST BLOOM - SMS-2 4907 4481### 10008 5004 150 150### 100 189366 177366 235877 1601096 1542 1741 113 2427 2591798 2353903 257977 Jul'21 2591798 2021-22

BILLETS 2500 2739### 8663 4331 160 160### 100 122395 161907 178315 1124440 1431 1276 89 1605 1772347 1329637 203001 Mar'06 2077666 2005-06
BAR MILL 1300 763### 3488 1744 71 70### 98 57638 66823 78560 509096 630 575 91 771 848971 551839 92231 Mar'11 886574 2018-19
SPECIAL BAR MILL 1700 824### 2320 1160 50 49### 98 25002 51184 42893 421316 424 468 110 380 427043 262247 56571 Oct'22 497075 2018-19
WIRE ROD MILL-1 3700 3600### 6234 3117 85 85### 100 63772 88607 91137 579617 757 659 87 829 914664 747716 108076 Mar'10 1055040 2006-07
WIRE ROD MILL-2 3000 2557### 4988 2494 52 52### 100 40898 59024 51413 457702 444.0 504.7 114 454 506805 430477 60743 Dec'22 554465 2019-20
MMSM 2000 1247### 4491 2245 65 63### 98 49575 65310 95511 494298 511.0 553.3 108 651 717496 463375 111534 Mar'10 1076643 2006-07
STRUCTURAL MILL 2800 1986### 4484 2242 48 47### 99 21506 64885 35885 461923 446 505 113 374 412696 256365 64885 Jan'23 412696 2021-22
FINISHED STEEL 14500 10074 25101 12551 371 366### 99 258390 395833 351122 2915816 3204 3257 102 3381 3750380 2693831 409856 Mar'18 4235469 2018-19
SALEABLE STEEL 16464 10688 26031 13015 426 418 0 98 369068 412758 484569 3161394 3531 3553 101 4702 5137943 4162603 521199 Mar'19 5138197 2021-22
POWER GEN(Total)-MW 344 267### 265 265 344 265 0 77 245.4 269 385 205 320 210 66 337 327.9 314.4 394.1 Mar'21 359 2018-19
GROSS COKE 8525 7511### 15921 7960 240 223 0 93 188458 258601 263295 2084074 2200 2291 104 2831 3045253 2478650 285950 Mar'21 3045253 2021-22
BF COKE 7199 6343### 13444 6722 207 188 0 91 162304 218374 228071 1764770 1894 1940 102 2443 2626424 2133767 247657 Mar'21 2626424 2021-22
AMM. SULPHATE 154 133### 273 137 4 3.8 0 89 2945 4013 4628 34615 39 38.2 97 46.7 50207 42241 4834 Mar'21 50207 2021-22
CRUDE TAR 379 321### 681 341 11 9.5 0 90 7684 11119 11247 88966 97 97.8 101 121.2 129902 104498 12301 Mar'21 129902 2021-22
0 TAR PRODUCTS 221 276### 552 276 6 7.7 0 125 5230 6173 8290 61195 50 68.4 137 68.9 74235 74700 8714 Oct'15 90675 2018-19
HP NAPTHALENE 5 ###
6 12 6 0.1 0.2 0 129 129 133 ** 1369 1.1 1.5 144 1.5 1669 1502 406 Feb'96 3483 1995-96
CRUDE BENZOL 59 27### 54 27 2 0.8 0 46 1147 522 1733 6893 15.2 7.6 50 10.4 11425 11215 2134 Mar'96 20008 2017-18
GRAN. SLAG 5701 5511### 11135 5568 149 156 0 105 158882 173742 ** 1399980 1399 1545 110 1973 2134288 1587340 ** ** ** **
ENGG. SHOPS 51 15### 28 14 1.4 0.4 0 27 1277 1323 1385 13977 16.1 14.3 89.3 14.7 16046 14760 1875 Dec'12 17592 2004-05
TEMP. BRICKS 5 ###
0 0 0 0.2 0 0 0 16 0 ** 546 1.3 0.5 42.5 0.8 754 1354 2037 Mar'96 18039 1994-95
GROSS LIME 1443 1195### 2417 1209 40 34 0 84 37027 42323 ** 373260 373.1 404.7 108.5 498.7 537265 449159 52243 Feb'21 549504 2018-19
GROSS CAL DOLO 320 366### 747 374 9 10.5 0 117 5950 9148 ** 77753 106.2 87.5 82.4 98.3 104632 90958 12534 Nov'17 122372 2018-19
BF Limestone from JLM 857 ###
0 490 245 24 7 0 29 ** 12820 ** 104170 146.0 110.5 ** 279.2 301618 197630 56124 Dec'13 457620 2006-07
BF/SMS Dolomite from MDM 2857 1900### 4100 2050 80 57 0 72 ** 44675 ** 422805 597.0 476.1 80 420.1 405542 146864 65240 Mar'07 680293 2005-06
Mn Ore from GARBHAM 36 0### 0 0 1.0 0.0 0 0 ** 0 ** 2719 1 ** ** ** 4421 879 ** ** ** **
0 0
IOF & IOL ( 6 DAYS ) STOCKS ARE LOW.
0 0
0 0
### Production Planning and Monitoring PAGE NO:-1
Despatches 2-Feb-23 ### Vizag Steel's Performance
(All figures are provisional) Unit : Tonnes unless otherwise stated
Actual (t) Approx
Item ON DATE For the month (FEB'23) Last 2022- 2021- Loadable stock as on
Plan Act. Cuml. Avg/ Plan Rate ### % month 2023 2022 Ist 03-Feb
day 000t ful (JAN'22) (till date) (6 A.M) Movement to CDY On date To date

FINISHED STEEL 13250 11728 24924 12462 371 348.9 ### 94 370702 2840935 3770928 34382 32861 BSY-1 0 0
BAR PRODUCTS 2536 1643 4875 2437 71 68.2 ### 96 67074 502116 848066 6646 6763 BSY-2 0 0
SBM PRODUCTS 1786 1815 2586 1293 50 36.2 ### 72 52279 413896 429615 1749 0 Billets 261 261
WIRE RODS -1 3036 1836 4598 2299 85 64.4 ### 76 84393 563157 896647 4243 6282 BARS 909 3007
WIRE RODS -2 1857 1858 3368 1684 52 47.2 ### ** 58597 445938 506600 5153 7211 WRM-1 1689 3725
MMSM PRODUCTS 2321 2034 4898 2449 65 68.6 ### 105 54637 467768 670532 11735 9196 WRM-2 1858 3368
STM PRODUCTS 1714 2541 4600 2300 48 64.4 ### 134 53723 448061 419468 4856 3408 MMSM 1972 4486
SALEABLE BILLETS(LMMM) 36 261 261 131 1 1.2 ### 119 1220 8474 16297 413 166 SBM 1783 2299
SALEABLE BILLETS(MMSM) 0 0 0 0 0 0.9 ### 0 0 7929 56281 51 51 STM 2436 4363
SALEABLE CC BLOOMS 1929 353 668 334 54 50.8 ### 94 15705 229060 1315125 12000 13000 Total 10908 21509
SAL.BLOOMS (SMS-1 & MMSM150) 250 243 442 221 7 ** ### ** 5422 68728 131459 ** **
SAL.CC BLOOMS -2 1679 110 226 113 47 ** ### ** 10284 160332 1183666 12000 13000 Ondate Todate
CUTTINGS 0 0 0 0 0 ** ### ** 0 0 0 ** ** Road Despatches (Total) 18746 39296
-Billetend ** 0 0 0 0.0 ** ### ** 0 0 0 ** ** Pig Iron-Total (Road) 0 0
Bloom scrap 0.0 0 0 0 0.0 0.0 ### 0.0 0 0 824 ** ** - Domestic 0 0
T & B chips 0.0 0 0 0 0.0 0.0 ### 0.0 0 2409 261 ** ** - Export 0 0
MILL Mix Steel Scrap ** 0 0 0 ** ** ### ** 0 545 791 ** **
Tundish Skull/Chilled Cast Steel 0.0 0 0 0 0.0 ** ### ** 0 0 577 ** **
Steel Scarp from Slag 0.0 0 0 0 0.0 ** ### ** 0 0 492 ** ** DESPATCH RAKE RETENTION DETAILS
PIG IRON 96 0 0 0 2.7 0.0 ### 0.0 257 43441 82153 2700 2700 On date Till date
GRAN SLAG(TOTAL) 6857 8607 21864 10932 192 306.1 ### 159 271343 2054341 2426228 ** ** Rakes (Nos) 4 7
GRAN SLAG(SSY-1) ** 7542 11277 5639 0 ** ### ** 152633 1481096 0 ** ** Retention Time (Hrs) 10.83 10.69
GRAN SLAG(SSY-2) ** 1065 10587 5294 0.0 ** ### ** 118710 573245 0 ** **
COKE DUST 125 66 66 33 3.5 0.9 ### 26 2885 27697 11967 ** ** INCOMING RAKE RETENTION DETAILS
COKE SLUDGE 71 182 253 126 2.0 3.5 ### 177 1518 13500 26077 ** ** On date Till date
NUT COKE 0 0 0 0 0.0 0.0 ### 0 0 0 6826 ** ** Rakes (Nos) 6 21
Iron Scrap - Muck & Fines 0 0 0 0 0.0 0.0 ### 0 0 4434 127 ** ** Retention Time (Hrs) 6.90 7.32
AMM.SULPHATE 232 202 379 190 6.5 5.3 ### 82 4272 34360 52027 2224 2113
CRUDE TAR 125 141 141 70 3.5 2.0 ### 56 1929 22839 41117 150 150
HP NAPHTHA 7 0 0 0 0.2 0.0 ### 0 209 1387 1568 75 56
PITCH 88 228 483 241 2.5 6.8 ### 276 2030 22333 25772 30 30
BENZENE 15 0 0 0 0.4 0.0 ### 0 0 3648 5429 15 4
TOLUENE 3 0 0 0 0.1 0.0 ### 0.0 0 814 1022 33 44
LSO/SOL/St.B.Oil/DNO/Ph. Fr 12 23 23 12 0.3 0.3 ### 95 48 1849 2451 329 358
POOLED IRON/Fines & Chunks 25 0 0 0 0.7 0.0 ### 0 0 10576 70343 0 0
CI SCRAP / JAMS 1 0 0 0 0.0 0.0 0 164 164 0 ** **
CRMP LS Returns/Chips 0 0 0 0 0 0 0 3748 32579 29284 ** **
LIME FINES 163 147 295 148 4.6 4.1 ### 90 3212 31381 31307 ** **
BC MILL REJCTS 0 0 0 0 0 0.0 ### ** 0 589 3471 ** **
LD Slag / Muck & Debris ** 758 1544 772 0 ** ### ** 1987 22099 11625 ** **
FLY ASH ** 631 1041 521 0 ** ### ** 12641 121059 140449 ** **
Liq. OXYGEN(t) 0.0 0 0 0 0 0.0 ### ** 0 1228 10727 ** **
Liq.NITROGEN(t) 0.0 0.0 8.2 4.1 0 0.1 ### ** 795 8682 7668 ** **
Liq.ARGON(t) 0.0 0.0 0.0 0.0 0.0 0.0 ### ** 0 480 1019 ** **

0 0.0
TOTAL ('000 t) 23.0 23.3 52.0 26.0 645.2 727.3 ### 113 694.8 5550.2 8153.0 ** **

Production Planning and Monitoring PAGE NO: 4


Raw materials 2-Feb-23 Vizag Steel's Performance
On Date For the month For the month ('000t) Last month 2022 -23 2021 - 22 Approx Reclm. No of
Rakes/ t Comulative(t) rakes Plan Rate % ful Actual (t) (till date) ACTUAL stocks (t) Days
ICC TOTAL 8269 23236 0 400 325 81 408888 2848843 4481467 135025 11
ICC - Aus. Hard CC 0 2999 0 ** ** ** 143705 848107 1899715 51866 14
Goonyella/Mn/GYMS 0 2999 0 ** ** ** 143705 684088 1501606 50065 **
PD 0 0 0 ** ** ** 0 164019 1801 **
ICC-Non-Aus. Hard CC 8190 20135 0 ** ** ** 153384 1154867 891230 70623 14
Creek 2846 10016 0 ** ** ** 68321 480542 494195
44129 **
Tech Eagle 0 0 0 ** ** ** 0 0 71891
Benga @ 5344 9204 0 ** ** ** 31518 353105 297375 22522 **
Tuhup 0 915 0 ** ** ** 53545 321220 27551 3972 **
Imported Soft Coal 79 102 0 ** ** ** 111799 845869 1690522 12536 4
BD SOFT 0 0 0 ** 0 0 0 77775 0 62 **
Moura Soft 79 102 0 ** ** ** 60450 124529 239379 8271 **
Kestrel 0 0 0 ** ** ** 0 270481 632317 0 **
BWS 0 0 0 ** ** ** 51349 373084 818826 4203 **
PCC 0 0 0 20 0 0 0 43286 10136 1840 **
MCC in CC Bed 0 3970 1 48 56 116 42054 248397 194811 27480 29
BC TOTAL 0 0 0 180 0 0 101026 721371 919214 75721 15
-Talcher 0 0 0 ** ** ** 52549 267011 591105 ** **
-BOCM / Others ** 0 0 0 ** ** ** 11727 258407 180306 ** **
-Singareni 0 0 0 ** ** ** 36750 195953 147803 ** **
Imported BC 4429 4429 0 0 ** ** 29667 262947 366082 26434 23
PCI Coal / Aux. Fuel for BF 0 659 0 80 9 ** 0 233187 705192 15414 8
I-O-L(RMHP) 0 13731 3 350 192 55 209148 2010915 3117800 64543
6
I-O-L (IOSA) ** ** ** ** ** ** ** ** ** 0
SIZED ORE 0 0 0 0 0 ** 0 820 1069229 67850 9
I-O-F (RMHP) 20501 5 480 287 60 264974 2468525 3835666 71211
1 / 4262
I-O-F (IOSA) ** ** ** ** ** ** ** ** 33961 6
I-O-F (Slime) 0 4111 1 260 58 22 116768 838311 1353377 **
I-O-F (Road) & MUY 0 0 ** ** ** ** 0 0 0 9729
BF L/S 1 / 2795 5720 2 24 80 334 19110 115269 318989 15060 27
SMS L/S 1 / 4149 8227 2 100 115 115 151458 895481 1278970 111235 30
BF DOLO -Tot 1 / 2881 6724 2 60 94 157 54945 432658 729924 18295 9
-BRMP/BYL/BUA 0 3843 0 4 54 1345 27639 144259 359639 ** **
-Madharam 1 / 2881 2881 2 56.0 40.3 72 27306 288399 370285 ** **
SMS DOLO -Tot 0 2952 1 28 41 148 34612 160754 245862 8043 8
-Madharam 0 2952 1 24.0 41.3 172 18695 128041 72440 ** **
-BYL/BUA/BKL 0 0 0 4.0 0.0 0 15917 32713 173423 ** **
MnORE(L) 0 0 0 1 0.0 0 273 3762 8266 0 **
MnORE(F) 0 0 0 0 0.0 0 0 0 0 0 **
SAND / QTZ(F) 0/0 0 /0 0 0.4 0.0 0 1001 17591 38250 6529 **
QTZ (L) 0 123 ** 0.0 1.7 ** 818 5914 17060 3467 **
BF Coke 0 0 0 0 0.0 ** 0 0 0 16570 **
Anthracite coal 0 0 0 8 0 0 0 66 18250 1660 **
Iron ore Pellets 0 0 0 60 0 0.0 0 207 23763 0 **
SINTER(at OHP) 0 0 0 ** ** ** 0 0 0 ** **
OLI FLUX (BY ROAD ) 0 0 ** 0 ** ** 0 0 0 1000 **
@ BENGA - SAIL (t) 0 BC (Others) from VZP (t) 0 ++ SMS LS - VZP (t) 0
Production Planning and Monitoring PAGE NO: 3
Unit wise Production 2-Feb-23 Vizag Steel's Performance
(All figures are provisional) Unit : Tonnes unless otherwise stated
For the month (FEB'23) Actual
Item On Date Cuml. Avg./ CPLY Last BEST 2022 - 23 Actual (t)
Plan Act. day Month FEB (till date) 2021 - 22 2020 - 21 Best Performance
(FEB'22) (JAN'22) Daily Day Monthly Month Yearly Year
Production

TIPPLING/day-Nos 800 266 945 473 ### 461 449 646 352 489 396 932 11.12.03 665 Mar'20 582 2004-05
SIZED ORE ( Total ) 7500 3000 8600 4300 ### 189040 152870 224750 1406990 2166335 1806540 11100 10.02.20 226585 Jan'22 2166335 2021-22
- LOCP-1 3300 3000 8600 4300 ### 110095 104320 146420 872430 1271270 1137490 6775 04.03.19 157500 Mar'15 1578590 2006-07
- LOCP-2 3200 0 0 0 ### 78945 48550 101750 534560 895065 669050 5300 11.02.22 109205 Dec'21 895065 2021-22
OVENS/day-Nos 370 326 691 346 ### 291 362 412 297 375 296 419 03.03.21 412 Feb'21 375 2021-22
BASE MIX(Total) 28600 27300 54500 27250 ### 646800 788900 744900 5970200 8929400 7000300 34800 23.04.21 889400 Dec'21 8929400 2021-22
- RMB 17600 14000 27100 13550 ### 388200 431000 575400 3227900 5444200 4380850 26200 26.01.11 612000 Oct'11 6374950 2005-06
- RMPP 11000 13300 27400 13700 ### 258600 357900 287000 2742300 3485200 2619450 16700 03.01.21 393400 Dec'20 3485200 2021-22
GROSS SINTER(Total) 26000 26570 52065 26033 ### 602956 716226 714476 5601899 8004140 6401961 30500 13.03.20 787091 Jan'22 8004140 2021-22
- M/C-1 9300 9400 17845 8923 ### 200609 257026 269887 2213164 2678067 3017255 12175 29.12.19 307815 Dec'20 3017255 2020-21
- M/C-2 6700 6790 13800 6900 ### 144567 192835 246108 1105005 2041451 1063111 10409 05.08.03 268846 Oct'05 2945992 2005-06
- M/C-3 10000 10380 20420 10210 ### 257780 266365 273302 2283730 3284622 2321595 13150 16.03.16 319590 Dec'20 3284622 2021-22
HOT METAL(Total) 15000 14500 29300 14650 ### 412080 457030 532060 3592337 5773650 4681615 20400 23.03.21 579350 Mar'21 5773650 2021-22
- F/C-1 7500 7400 14800 7400 ### 211301 233985 211301 1745093 1960596 2268050 8100 15.01.23 233985 Jan'23 2268050 2020-21
- F/C-2 7500 7100 14500 7250 ### 200779 223045 200779 1847244 2064396 1366750 8500 08.12.22 236160 Dec'22 2103067 2005-06
- F/C-3 0 0 0 0 ### 0 0 214950 0 1748658 1046815 9040 22.12.18 235421 Nov'18 2521991 2017-18
HEATS/day-Nos(Total) 99 89 191 95.5 ### 97.2 98.5 127.8 76.1 102.4 82.7 142 10.01.21 127.8 Feb'21 104.4 2018-19
- SMS-1 65 59 124 62.0 ### 50.8 61.4 79.3 41.5 54.2 38.8 86 27.09.04 79.3 Feb'06 68.9 2006-07
- SMS-2 34 30 67 33.5 ### 46.5 37.1 57.3 34.6 48.2 43.8 68 30.01.21 57.3 Feb'21 48.2 2021-22
LIQUID STEEL (Total) 14444 12998 27926 13963 ### 405299 451427 532040 3514694 5517526 4491658 20530 10.01.21 565066 Mar'21 5517526 2021-22
- SMS-1 9357 8378 17608 8804 ### 209154 269853 317438 1866010 2836595 2056912 12337 17.01.10 341227 Mar'10 3606178 2006-07
- SMS-2 5087 4620 10318 5159 ### 196145 181574 243656 1648684 2680931 2434746 10411 30.01.21 266127 Jul'21 2680931 2021-22
CAST BLOOM (Total) 13725 12396 26645 13323 ### 387014 432378 510486 3367604 5271738 4301807 19547 10.01.21 537174 Mar'21 5271738 2021-22
- SMS-1 8818 7915 16637 8319 ### 197648 255012 299059 1766508 2679940 1947903 11646 17.01.10 322385 Mar'10 3401952 2003-04
- SMS-2 4907 4481 10008 5004 ### 189366 177366 235877 1601096 2591798 2353903 9994 30.01.21 257977 Jul'21 2591798 2021-22
LMMM PRODUCTS 3000 1587 5807 2904 ### 32639 118007 0 930412 1276014 814086 #REF! #REF! 0 0 2077666 2005-06
BAR MILL 1300 763 3488 1744 ### 57638 66823 78560 509096 848971 551839 4520 09.03.10 92231 Mar'11 886574 2018-19
SPECIAL BAR MILL 1700 824 2320 1160 ### 25002 51184 42893 421316 427043 262247 3549 12.12.21 56571 Oct'22 497075 2018-19
WIRE ROD MILL-1 3700 3600 6234 3117 ### 63772 88607 91137 579617 914664 747716 4171 04.08.05 108076 Mar'10 1055040 2006-07
WIRE ROD MILL-2 3000 2557 4988 2494 ### 40898 59024 51413 457702 506805 430477 3444 31.03.19 60743 Dec'22 554465 2019-20
MMSM 2000 1247 4491 2245 ### 49575 65310 95511 494298 717496 463375 5561 23.02.10 111534 Mar'10 1076643 2006-07
STRUCTURAL MILL 2800 1986 4484 2242 ### 21506 64885 35885 461923 412696 256365 3476 30.01.23 64885 Jan'23 412696 2021-22
FINISHED STEEL(Total) 14500 10976 26004 13002 ### 258390 395833 351122 2915816 3750359 2693831 18695 28.02.21 409856 Mar'18 4235469 2018-19
- 3.0 Mt Stage Units 7000 5609 14213 7106 ### 170984 220740 252553 1574877 2403816 1762930 12839 25.03.10 308867 Mar'10 3010139 2006-07
- Expanstion Units 7500 5367 11791 5896 ### 87406 175093 125760 1340939 1346544 930902 7830 24.08.22 175093 Jan'23 1405644 2018-19
SALEABLE STEEL(Total) 16464 11591 26933 13467 ### 369068 412758 484569 3161394 5138197 4162603 24123 19.02.21 521199 Mar'19 5138197 2021-22
- 3.0 Mt Stage Units 7286 6114 14916 7458 ### 181604 227382 271769 1660012 2607853 1822941 ** ** 324943 Mar'10 3290155 2006-07
- Expanstion Units 9179 5477 12017 6009 ### 187465 185376 244374 1501381 2530344 2339661 ** ** 264683 Jul'21 2530344 2021-22
SEMIS (Total) 1964 615 929 465 ### 110678 16925 ** 245578 1387563 1468772 10366 19.02.21 145067 Mar'15 795534 1995-96
- 3.0 Mt Stage 286 504 703 352 ### 10619 6641 ** 85135 203889 60010 4542 30.03.13 139826 Mar'97 795534 1995-96
- Expanstion Units 1679 110 226 113 ### 100059 10284 ** 160442 1184074 1408760 10280 19.02.21 138329 Mar'15 663669 2018-19
GROSS LIME (Total) 1443 1195 2417 1209 ### 37027 42323 ** 373260 537265 449159 2067 03.01.21 ** ** 549504 2018-19
GROSS LIME - Rotary Kilns 843 694 1414 707 ### 15816 23933 ** 158497 241230 189645 ** ** ** ** 302968 2015-16
GROSS LIME - Shaft Kilns 600 501 1003 502 ### 21211 18390 ** 214763 298591 276130 ** ** ** ** ** **
Production Planning and Monitoring PAGE NO: 2
Technoeconomics 2-Feb-23 Vizag Steel's Performance
(All figures are provisional)
R M H P (Nos) 0 COKE OVENS 0 BF Ondate Todate SMS On Date To Date HEATS MADE (Nos)
Material O.B Recpt Tiplng C.B Avg. Pushing Ondate Todate Avg/Day BF-1 BF-2 BF-3 Over All BF-1 BF-2 BF-3 Over All SMS-1 SMS-2 SMS-1 SMS-2 SHIFT SMS-1 SMS-2
ANTHRACITE 0 0 0 0 0 (Nos) 0.0 0.0 Heats made Nos/day 59 30 62 34 A 21 8
ICC 0 0 0 0 0 Batt-1 68 145 72.5 No of casts 13 11 0 24 27 22 0 49 Liquid Steel Production -t/day 8378 4620 8804 5159 B 19 11
MCC/PCC 0 0 0 0 30 Batt-2 77 161 80.5 Productivity on 0 0 0 0 Avg.heat wt. t 142.0 154.0 142.0 154.0 C 19 11
BC+IBC 0 0 0 0 14 Batt-3 47 96 48.0 Working Vol. 2.21 2 2.17 2.21 2.17 0.00 2.19 Blooms made Nos 2251 2100 4791 4690 On Date 59 30
I/Ore 94 58 152 0 270 Batt-4 57 120 60.0 -t/cum/avl.day 0 0 0 0 0 0.0 0.0 Cast bloom yield % 94.5 97.0 94.5 97.0 Till Date 124 67
Sinter 0 0 0 0 0 Batt-5 77 169 84.5 0 0 0 0 0 Consumption 0 0 0 0 0 0 0 0
Flux 0 146 114 32 159 Total 326 691 346 %Sinter in burden 75.4 77 0.0 76.4 74.7 76.0 0.0 75.3 Hot metal Kg/tls 995 998 995 998 0 0 0
BF Coke 0 0 0 0 0 Shift-wise pushing-Nos 0 0 114/132/80 0 0 0 0 Steel Scrap Kg/tls 103 112 102 117 0 0 0
CHP 0 0 0 0 44 CPP 0 0 STOCKS (t) %Pellets in burden 0.0 0 0 0.0 0.0 0.0 0 0.0 Iron scrap/Pig iron Kg/tls 0 0 0 0 0 0 0
O&F 94 204 266 32 429 0 Total - MB Stock 0 10905 0 0 Szd Ore Kg/tls 0 16 0 16 0 0 0
RMHP 94 204 266 32 473 0 Coal Tower-1 0 3100 %SZD Ore in burden 25 23 0 24 25 24 0 25 Sinter Kg/tls 4 0 4 0 0 0 0
RECLAIMING (t) 0 Ondate 0 Todate 0 Coal Tower-2 0 2900 0 0 0 Calcined Lime Kg/tls 63 62 63 62 0 0.0
TO COKE OVENS 0 0 0 0 Coal Tower-3 0 0 Burden ratio 3.63 3 3.54 3.63 3.52 0.00 3.57 Liquid Steel Production -(t) (for the month) 0 17608 10318 0 0.0
Coking Coal 0 14000 0 25800 CCP Month Plan Prodn(t) 0 0 0 Grade SIZE Plan Aimed Grade SIZE Plan Aimed
TO TPP 0 0 0 0 Ondate Todate No of charges 140 137 277 281 277 0 558 FE500D LMMM 50 41 19MNB4MS-RH 150X150 10 10
BC-crushed 0 0 2800 0 6300 Benzene ** 10 26 0 0 0 0 A105R MMSM 15 3SP 150X150 9
MCC 0 0 0 0 0 Toulene ** 8 11 Consumption (Kg/thm) 0 0 0 0 FE500DW LMMM 4 SMS-2 FE500D 150X150 10 17
SMS-1
IBC 0 0 960 0 1360 SOL 110 ** 3 5 FUEL RATE 537 581 558 539 562 0 550 2830 MMSM 14 LHBR19NiM 380MM 2
TO RMB 0 0 0 LSO ** 5 10 EN8D 200x200 5 1
I/O Fines 0 9300 0 18700 S P 0 0 0 BF COKE (Dry) 418 444 431 420 436 428
BF Dol 0 950 0 1200 0 M/C-1 M/C-2 M/C-3 0 0 0 TOTAL 0 65 59 0 TOTAL 0 34 30
BF L/S 0 0 0 0 Run Time - Hrs/Day 0 0 NUT COKE (Dry) 28 29 28 28 28 28 CCD-1 M/C Closures Heats cast(nos) Heats/ CCD-2 M/C Closures Heats cast (nos) Heats/
CRMP Returns 0 370 0 770 Ondate 21.7 20.7 20.8 0 0 0 CCM Ondate /Todate Ondate Todate Seq CCM Ondate / Todate On Date Todate Seq
Sand 0 0 0 0 Till Date 20.8 10.3 10.4 FUEL INJCTN (Dry) 91 108 99 91 97 94 1 1 / 02 2 6 3.0 1 1 / 03 12 29 9.7
Qtz( f ) 0 0 0 0 Prodn rate - t/hr 0.00 0.00 0 0 0 2 2 / 02 12 29 14.5 2 1 / 03 15 32 10.7
Oli Flux 0 0 0 Ondate 434 329 498 SINTER 1230 1264 1246 1220 1251 1235 3 1 / 01 12 27 27.0 3 1 / 01 1 4 4.0
TO RMPP 0 0 0 Till Date 428 328 495 0 0 0 4 0 / 01 9 10 10.0 4 1 / 01 2 2 2.0
I/O Fines 0 9600 0 21400 0 RMB RMPP 0 SZD ORE 401 371 386 413 396 405 5 1 / 01 6 25 25.0 0 0 0 0 0
BF Dolo 0 550 0 900 Met waste consumpn- t 0.0 0.0 6 0 / 00 18 27 0.0 0 0 0 0 0
BF L/S 0 0 0 1000 Ondate 1920 446 PELLETS 0 0 0 0 0 0 Total :: 5 / 07 59 124 17.7 Total :: 4 / 08 30 67 8.4
CRMP Returns 0 1100 0 1550 Till Date 3260 950 Heats Cast in L-size 45 91 0 Heats Cast in 150 size 27 61 0.0
Sand 0 0 0 0 LD Slag Consumpn - t 0.00 0.00 0 SLAG RATE 309 329 ** 315 329 ** Heats Cast in M-size 14 33 0 Heats Cast in 200 size 1 4 0
Qtz( f ) 0 0 0 0 Ondate 400 47 0 O2 ENRICHMENT (%) 3.2 4 ** 3.2 3.6 0.0 ** 0 0 Heats Cast in 430 Round 2 2 0.0
Oli Flux 0 0 0 0 Till Date 500 69 0 (at 6.00am) 0 0 0 0 0 Conv-A Conv-B Conv-C 0 Conv-D Conv-E Conv-F
TO SINTER M/Cs 0 0 0 Lime fines Consumpn - t RMB M/C-3 0 0 0 0 0 Heats made on Date 18 20 21 Heats made on Date 10 20 0
Basemix to Sinter M/C-1&2 0 15900 0 30800 Ondate 168 306 HOT BLAST TEMP 1060 1060 ** 1060 1060 0 ** Lining life -Cur 0 3745 2858 1268 Lining life -Current. 4946 1780 C/RES
Basemix to Sinter M/C-3 0 10500 0 22200 Till Date 336 630 (at 6.00am) 0 0 0 0 -Previous. 6701 4984 6753 0 -Previous. 3318 6387 4520
TO BF 0 0 0 % SLIME Consumn at SP( For the month) - 27.1 BHS STOCK - SINTER 2450 2580 0 -Best Life. 7847 7777 6753 0 -Best Life. 4739 6387 4520
Sized ore to BF-1&2 0 8200 0 16100 Met waste consumpn (Kg / t of Ch. Sinter)- 95.1 (at 6.00 am) -Coke 450 470 0 0 Ondate Todate 0 0 0 Ondate Todate
Sized ore to BF-3 0 0 0 0 BMY-1 - Basemix 88400 -Szd ore 1690 1850 0 Heats Recycled-Occ Full 0 0 Heats Recycled-Occ Full 0 0
Yard Sinter to BF 0 0 0 0 - Sinter in Yard ( Sinter plan 111100 -Pellets 0 0 0 0 0 Partial 0 0 0 0 Partial 0 0
BF Coke to BF 0 0 0 0 BMY-2 - Basemix 113100 0 0 0 0 0 Heats Recycled-Tons Full 0 0 Heats Recycled-Tons Full 0 0
Nut Coke to BF-1&2 0 250 0 250 0 - Sinter in Bins(Dischagable 7287 0 Partial 0 0 0 0 Partial 0 0
Iron Ore Pellets to BF-1&2 0 0 0 0 Heat Recovery from on date 0.00 0 PCM Pouring - shift wise 0 0 0 0 Pooled Iron Pour 0 Tons Poured in EC(Full) -Occ 0 0 Poured in EC(Full) -Occ 0 0
Iron Ore Pellets to BF-3 0 0 0 0 SHRPP -Mcal/t of Sinter Avg/day 0.0 0 ( Nos ) On date 0 0 0 0 On date 0 0 0 -Tons 0 0 0 -Tons 0 0
Coal to BF for Injection 0 1830 0 3505 0 On date Till Date Till date 0 0 0 0 Till date 0 0 Poured in EC(Tot) -Tons 319 680 Poured in EC(Tot) -Tons 60 134
TO CRMP 0 0 0 LIME fines to Open Yard (t) 0 0 MILLS 0 0 0 0 0 0 0 0 0 0 0
SMS L/S to CRMP 0 0 2600 0 5600 Billet Mill Bar Mill WRM-1 WRM-2 MMSM SBM STM
SMS Dolo to CRMP 950 0 2600 CRMP Prodn (t) On date Till Date 0 Ondate Todate Ondate Todate Ondate Todate Ondate Todate Ondate Todate Ondate Todate Ondate Todate
TO SMS 0 0 0 0 FK-1 Lime 146 373 Rolled Nos 740 2340 633 2889 2979 5163 1236 2408 468 1674 401 1129 552 1246
Sized Ore to SMS-1 0 0 0 0 FK-2 Dolo 220 474 Nos
Production 2220 7020 630 2880 2975 5152 1233 2405 465 1671 400 1126 550 1242
Sized Ore to SMS-2 0 0 0 0 FK-3 Lime 229 435 Production Tons 2739 8663 763 3488 3600 6234 2557 4988 1247 4491 824 2320 1986 4484
Dolo to SMS-1 0 0 0 0 FK-4 Lime 250 457 Running Time hrs 8.33 26.33 6.50 25.08 20.41 35.74 17.00 33.50 9.42 23.59 11 30 13 31
Dolo to SMS-2 0 0 0 0 FK-5 Lime 215 422 t/hr
Rolling Rate 329 329 117 139 176 174 150 149 132 190 72 76 148 144
Sinter to SMS-1 0 150 0 150 SK-1 Lime 0 0 Blms rolled -250 Size Nos 0 0 0 0 0 0 0 0 468 1674 0 0 0 0
Sinter to SMS-2 0 0 0 0 SK-2 Lime 501 1003 Blms rolled -200 Size Nos 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0
MATERIAL SHIFTING PRODN (t) Briquettes. 63.6 92 Production - Coil Tons 0.00 0.0 0.00 0 0 0 0 0 0 0 0 0 0
I/O Fines Shifting from MUY 0 0 STOCK CTF at CRMP 1203.0 ** Production -Straight Tons 0.00 0.0 0.00 0.00 0 0 0 0 0 0 824 2320 0
CRMP returns Shifting to RMHP 800 0 1550 Lime at SMS- 500 ** Yield % 97.42 97.42 97.67 97.83 97.92 97.85 97.51 97.62 95.94 96.61 96.84 96.82 96.87 96.91
LD Slag Shifting to RMB 440 0 554 Lime at SMS- 300 ** Total SD days 0.60 0.60 0.63 0.63 0.00 0.13 0.00 0.00 0.25 0.25 0.000 0.00 0.15 0.15
Metallurgical Waste Shifting 900 0 1800 0.0 Section rolled mm SD/16R 8R 16P BLT90/BLT125 20R RND50
Production Planning & Monitoring PAGE NO: 5
Quality & Services 2-Feb-23 Vizag Steel's Performance
(All figures are provisional)

QUALITY (%) Aus - EMD TPP Ondate Avg/Day


Hard Non Aus
C.Coals CC Hard CC ISC MCC BF-1 Min Max Last Cast BF-2 Min Max Last Cast BF-3 Min Max Last Cast Item ('000 Ncum/hr) CO gas BF gas LD gas Heat Con-MCal Power Gen - Total MW 267.4 265.4
Hot Hot Hot
30 40 23 7 Metal Si 0.38 0.79 0.69 Metal Si 0.25 0.71 0.37 Metal Si Make 154.1 978.0 65.1 Ondate Todate - CPP-2 MW 91.1 89.3
Mn
MB Stock 3185 4105 2545 1070 Mn 0.06 0.09 0.06 Mn 0.08 0.15 0.11 Distribution - TGs (TPP) MW 135.6 135.3
S
S 0.029 0.048 0.039 S 0.046 0.100 0.046 CO 57.8 57.0 ** 667 635 - BPTS MW 11.0 10.6

Item Content Min Max Avg P 0.08 0.10 0.09 P 0.09 0.10 0.09 P SP-1 4.5 0.0 ** 27.9 28.2 - GETS MW 9.9 10.0

Coal V.M 24.71 25.82 25.44 BF Slag FeO 0.20 0.88 0.26 BF Slag FeO 0.31 0.91 0.47 BF Slag FeO SP-2 1.3 0.0 ** 13 12 - COB4&5 MW 19.9 20.2

T.M 8.4 9.2 8.9 MgO 8.52 10.09 8.96 MgO 8.31 8.87 8.68 MgO BF 2.8 307.0 0.0 451 446 - TRT MW 0.0 0.0

+3 mm 27.00 30.00 28.33 Al2O3 16.91 19.52 19.52 Al2O3 16.75 18.50 18.50 Al2O3 SMS-1 2.8 ** ** 35 33.8 - NEDO MW 0.0 0.0

ASH 10.25 10.75 10.46 Basicity 1.00 1.07 1.02 Basicity 0.91 1.00 0.95 Basicity SMS-2 2.0 ** ** 45 40 - SOLAR MW 0.0 0.0

Coke V.M 0.58 0.62 0.60


Sinter M/C-1&2 Sinter M/C-3 SMS-1 Min Max Billet Mill 11.5 3.5 25.0 836 627 - IMP MW 129.2 134.0

ASH 13.77 14.55 14.10 Min Max Avg Min Max Avg LD SLAG Basicity 3.0 3.9 Bar Mill 0.2 0.1 0.4 51 27 - EXP MW 0.0 0.0

M+40 *** *** NS T.Fe 56.01 56.66 56.46 T.Fe 55.57 57.15 56.09 FeO 17.3 23.0 WRM-1 4.5 1.4 9.9 252 242 - Net Impo MW 129.2 134.0

M-10 *** *** NS FeO 10.19 10.71 10.28 FeO 10.19 10.71 10.47 MgO 8.0 10.3 WRM-2 3.3 2.1 4.9 227 214 NEDO-Net generation MW 0.0 0.00

+75/80 mm *** *** NS CaO 9.14 9.56 9.25 CaO 8.84 9.68 9.43 MMSM 2.7 1.3 5.3 412 392 Steam generation t 23032 22875

-20 mm *** *** NS MgO 2.00 2.10 2.05 MgO 1.92 2.05 2.01
SMS-2 Basicity 3.3 3.6 SBM 1.8 1.2 2.6 379 321 Coal Consumption t 2570 5373

CRI: NS CSR: NS SiO2 5.74 6.11 5.85 SiO2 5.36 6.55 6.20 LD SLAG FeO 17.3 22.1 STM 3.2 1.9 5 281 255 Oil Consumption KL 0.0 0
Basemix Bed Details Al2O3 2.54 2.70 2.63 Al2O3 2.60 2.78 2.67 MgO 7.5 9.8 TPP 40.6 365 0 782 771 Oil(FO+HSD) Stock KL 275 **

RMB RMPP MnO 0.10 0.10 0.10 MnO 0.05 0.08 0.07 On Date Till Date CPP-2 8.2 231 10.6 732 750
Stacking
A E Basicity 1.57 1.59 1.58 Basicity 1.48 1.65 1.53 Heats Treated at HMDP ( Nos) 0 ` CRMP-2 3.6 3.5 1.6 1007 1015 FeedWater Temp - (Deg.C) -
Blr-1 Blr-2 Blr-3 Blr-4 Blr-5 Blr-6
Span 140-426 40-240 Avail. Lime 3.35 3.45 3.40 Avail. Lime 3.10 3.48 3.23 Bleeding 0 3 ** ** **

%Pile made 66 13 -10mm to + 5 mm -10mm to + 5 mm Heats Treated at RH Degasser(N 0


0
CV 4179 849 1877 ** ** 153 138 148 124

Reclaiming B F -5 mm -5 mm BC stocks (t) ISB 2060


KBR-1
Span 140-416 40-240
WMD Level -E.C. 21.1 ASP Blr-1 Blr-2 Blr-3 Blr-4 Blr-5 Blr-6

Recl. Point 326 58 KBR-1 Intake - MGD 30.3 -W.C. 21.1 Prodn ('000 Ncum/Hr) Stock (t) 550 0 500 550 550 550

KBR-2 Intake - MGD 0.0 KBR-2 Level 20.9 Oxygen 77 Liq.Oxygen 2081 C P P-2 t Ondate Todate

Total Intake 30.3 KBR Stock -No of days 100.0 Nitrogen 142 Liq.Nitrogen 4619 Steam generation 8205 16018

-Avg/Day 31.0 Consumption Rate - Cum/tcs 2.8 Liq.Argon 430 Blr-1 205 **

Blr-2 205 **

Production Planning & Monitoring PAGE NO: 6


Delay Date Shop CodShop From Upto Durn Eqpt
02-02-2023 01 CHP 1.00 STKR
02-02-2023 01 CHP 22.00 6.00 8.00 STKR
02-02-2023 01 CHP 1.00 2.30 1.30 SCR
02-02-2023 01 CHP 6.00 6.05 0.05 GPL-2
02-02-2023 01 CHP 6.00 6.00 24.00 CT-2
02-02-2023 01 CHP 6.00 6.00 24.00 CT-1
02-02-2023 01 CHP 18.35 19.45 1.10 SCR
02-02-2023 01 CHP 1.00 STKR
02-02-2023 01 CHP 10.00 18.00 8.00
02-02-2023 01 CHP 17.30 18.00 0.30 SCR
02-02-2023 01 CHP 17.30 18.30 1.00 SCR
02-02-2023 01 CHP 15.05 15.50 0.45 SCR
02-02-2023 01 CHP 10.00 11.00 1.00 SCR
02-02-2023 01 CHP 7.15 9.30 2.15 SCR
02-02-2023 01 CHP 2.00 STKR
02-02-2023 01 CHP 1.00 STKR
02-02-2023 01 CHP 14.00 14.30 0.30 STKR
02-02-2023 01 CHP 6.00 6.45 0.45 STKR
02-02-2023 01 CHP 10.00 10.30 0.30 GPL-2
02-02-2023 01 CHP 10.30 10.50 0.20 GPL-1
02-02-2023 01 CHP 14.00 15.00 1.00 STKR
02-02-2023 01 CHP 9.40 10.15 0.35 STKR
02-02-2023 01 CHP 0.45 STKR
02-02-2023 02 O&F 1.00 OT-3
02-02-2023 02 O&F 6.00 6.00 BRC
02-02-2023 02 O&F 1.35 2.20 0.45 OT-3
02-02-2023 02 O&F 12.45 6.00 17.15 OT-5
02-02-2023 02 O&F 6.50 6.00 23.10 OT-4
02-02-2023 02 O&F 10.10 1.35 15.25 OT-3
02-02-2023 02 O&F 17.40 6.00 12.20 OT-2
02-02-2023 02 O&F 4.25 6.00 1.35 OT-1
02-02-2023 02 O&F 18.45 0.15 5.30 OT-1
02-02-2023 02 O&F 0.15 0.55 0.40 OT-1
02-02-2023 02 O&F 6.00 6.00 24.00 LOCP-2
02-02-2023 02 O&F 19.00 21.15 2.15
02-02-2023 02 O&F 6.00 6.00 24.00
02-02-2023 02 O&F 6.00 6.00 24.00
02-02-2023 02 O&F 6.00 6.50 0.50 OT-5
02-02-2023 02 O&F 6.00 10.20 4.20 OT-2
02-02-2023 02 O&F 6.00 13.45 7.45 OT-1
02-02-2023 02 O&F 1.00 BRC
02-02-2023 02 O&F 9.40 18.00 8.20 LOCP
02-02-2023 02 O&F 11.30 18.45 7.15
02-02-2023 02 O&F 10.00 18.15 8.15
02-02-2023 02 O&F 10.00 18.15 8.15
02-02-2023 02 O&F 0.45 OT-2
02-02-2023 02 O&F 15.30 16.30 1.00 OT-2
02-02-2023 02 O&F 0.30 OT-1
02-02-2023 02 O&F 16.30 16.50 0.20 OT-1
02-02-2023 02 O&F 15.05 15.30 0.25 OT-1
02-02-2023 02 O&F 6.00 9.40 3.40 LOCP
02-02-2023 02 O&F 10.20 10.55 0.35 OT-2
02-02-2023 02 O&F 13.45 14.35 0.50 OT-1
02-02-2023 03 COCCP 2.30 BATTERY-5
02-02-2023 03 COCCP 2.15 BATTERY-4
02-02-2023 03 COCCP 1.45 BATTERY-3
02-02-2023 03 COCCP 2.00 BATTERY-2
02-02-2023 03 COCCP 1.15 BATTERY-1
02-02-2023 03 COCCP 3.20 5.40 2.20
02-02-2023 03 COCCP 1.15 BATTERY-2
02-02-2023 03 COCCP 21.50 2.00 4.10
02-02-2023 03 COCCP 6.00 BATTERY-3
02-02-2023 03 COCCP 3.30 BATTERY-4
02-02-2023 03 COCCP 3.30 BATTERY-4
02-02-2023 03 COCCP 3.00 BATTERY-3
02-02-2023 03 COCCP 1.15 BATTERY-2
02-02-2023 03 COCCP 1.15 BATTERY-1
02-02-2023 03 COCCP 10.00 6.00 20.00 CSP
02-02-2023 03 COCCP 22.00 2.00 CPP
02-02-2023 03 COCCP 22.00 23.00 1.00 CPP
02-02-2023 03 COCCP 6.00 16.30 10.30
02-02-2023 03 COCCP 6.00 6.00 24.00
02-02-2023 03 COCCP 6.00 6.00 24.00
02-02-2023 03 COCCP 6.00 6.00 24.00
02-02-2023 03 COCCP 6.00 6.00 24.00
02-02-2023 03 COCCP 6.00 6.00 24.00
02-02-2023 03 COCCP 6.00 13.00 7.00
02-02-2023 03 COCCP 6.00 6.00 24.00 CSP
02-02-2023 03 COCCP 6.00 6.00 24.00 CCP
02-02-2023 03 COCCP 14.00 15.30 1.30 CPP
02-02-2023 03 COCCP 15.15 16.50 1.35
02-02-2023 03 COCCP 10.20 17.30 7.10 CPP
02-02-2023 04 SP 0.20 M/C-3
02-02-2023 04 SP 0.30 M/C-3
02-02-2023 04 SP 0.20 M/C-1
02-02-2023 04 SP 0.20 M/C-1
02-02-2023 04 SP 1.00 RMPP
02-02-2023 04 SP 0.40 M/C-3
02-02-2023 04 SP 15.00 15.40 0.40 M/C-3
02-02-2023 04 SP 18.40 19.00 0.20 M/C-2
02-02-2023 04 SP 18.40 19.00 0.20 M/C-1
02-02-2023 04 SP 0.20 M/C-1
02-02-2023 04 SP 0.20 M/C-1
02-02-2023 04 SP 0.20 M/C-1
02-02-2023 04 SP 2.00 RMPP
02-02-2023 04 SP 2.00 RMB
02-02-2023 04 SP 6.00 6.00 24.00
02-02-2023 04 SP 6.00 6.00 24.00
02-02-2023 04 SP 6.00 6.00 24.00
02-02-2023 04 SP 9.00 9.20 0.20 M/C-3
02-02-2023 04 SP 0.40 M/C-3
02-02-2023 04 SP 10.40 13.40 3.00 M/C-2
02-02-2023 04 SP 0.20 M/C-1
02-02-2023 04 SP 1.00 RMB
02-02-2023 04 SP 3.00 RMB
02-02-2023 04 SP 6.00 16.30 10.30
02-02-2023 05 BF 6.00 6.00 24.00 F/C-3
02-02-2023 06 SMS 1.00 CONV-A
02-02-2023 06 SMS 1.00 CONV-B
02-02-2023 06 SMS 17.30 6.00 12.30 CCM-5
02-02-2023 06 SMS 2.55 6.00 3.05 CCM-1
02-02-2023 06 SMS 2.00 4.00 2.00 CCM-2
02-02-2023 06 SMS 22.25 2.00 3.35 CCM-2
02-02-2023 06 SMS 21.00 22.50 1.50 CCM-1
02-02-2023 06 SMS 20.00 21.00 1.00 CCM-1
02-02-2023 06 SMS 10.00 20.00 10.00 CCM-1
02-02-2023 06 SMS 6.00 16.45 10.45 CCM-4
02-02-2023 06 SMS 6.00 10.00 4.00 CCM-1
02-02-2023 06 SMS 16.20 20.30 4.10 CCM-2
02-02-2023 06 SMS 17.00 18.25 1.25 CCM-3
02-02-2023 06 SMS 11.05 17.00 5.55 CCM-3
02-02-2023 06 SMS 16.10 17.30 1.20 CCM-5
02-02-2023 06 SMS 1.00 CONV-A
02-02-2023 06 SMS 1.00 CONV-A
02-02-2023 06 SMS 9.30 10.40 1.10 CONV-B
02-02-2023 06 SMS 7.00 16.30 9.30
02-02-2023 07 LMMM 1.00 BAR MILL
02-02-2023 07 LMMM 5.00 5.10 0.10 BAR MILL
02-02-2023 07 LMMM 0.50 1.00 0.10 BAR MILL
02-02-2023 07 LMMM 0.15 BAR MILL
02-02-2023 07 LMMM 0.15 BILLET MIL
02-02-2023 07 LMMM 0.10 BILLET MIL
02-02-2023 07 LMMM 0.15 BILLET MIL
02-02-2023 07 LMMM 1.00 BAR MILL
02-02-2023 07 LMMM 0.30 BILLET MIL
02-02-2023 07 LMMM 6.00 21.00 15.00 BAR MILL
02-02-2023 07 LMMM 6.00 20.30 14.30 BILLET MIL
02-02-2023 08 WRM 1.00 1.00 MILL
02-02-2023 08 WRM 22.30 23.10 0.40 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 3.00 3.10 0.10 MILL
02-02-2023 08 WRM 0.15 MILL
02-02-2023 08 WRM 17.10 17.30 0.20 MILL
02-02-2023 08 WRM 18.30 18.40 0.10 MILL
02-02-2023 08 WRM 14.45 15.25 0.40 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.15 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.15 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.10 MILL
02-02-2023 08 WRM 0.15 MILL
02-02-2023 09 MMSM 0.30 MILL
02-02-2023 09 MMSM 0.30 MILL
02-02-2023 09 MMSM 0.40 MILL
02-02-2023 09 MMSM 0.20 MILL
02-02-2023 09 MMSM 0.10 MILL
02-02-2023 09 MMSM 0.20 MILL
02-02-2023 09 MMSM 1.05 MILL
02-02-2023 09 MMSM 0.15 MILL
02-02-2023 09 MMSM 1.15 MILL
02-02-2023 09 MMSM 0.30 MILL
02-02-2023 09 MMSM 1.00 MILL
02-02-2023 09 MMSM 1.30 MILL
02-02-2023 09 MMSM 0.30 MILL
02-02-2023 09 MMSM 10.00 16.00 6.00 MILL
02-02-2023 10 TPP 4.30 6.00 1.30 BOILER-1
02-02-2023 10 TPP 6.00 6.00 24.00
02-02-2023 10 TPP 6.00 6.00 24.00 TRT
02-02-2023 10 TPP 6.00 6.00 24.00 TB-2
02-02-2023 10 TPP 6.00 6.00 24.00 NEDO
02-02-2023 10 TPP 6.00 6.00 24.00 BOILER-2
02-02-2023 12 CH 6.00 6.00 24.00 CH-3
02-02-2023 14 DNW 6.00 6.00 24.00
02-02-2023 14 DNW 6.00 6.00 24.00 LBSS-3
02-02-2023 15 CRMP 16.10 22.30 6.20 FK-1
02-02-2023 15 CRMP 6.00 6.00 24.00 SK-1
02-02-2023 16 SMS2 3.00 CONV-E
02-02-2023 16 SMS2 3.00 CONV-D
02-02-2023 16 SMS2 16.10 6.00 13.50 CCM-4
02-02-2023 16 SMS2 3.00 4.00 1.00 CCM-2
02-02-2023 16 SMS2 2.00 3.00 1.00 CCM-2
02-02-2023 16 SMS2 13.00 6.00 17.00 CCM-3
02-02-2023 16 SMS2 18.30 20.50 2.20 CCM-1
02-02-2023 16 SMS2 6.00 6.00 24.00 CONV-F
02-02-2023 16 SMS2 6.00 10.10 4.10 CCM-4
02-02-2023 16 SMS2 14.00 18.30 4.30 CCM-1
02-02-2023 16 SMS2 11.05 13.00 1.55 CCM-3
02-02-2023 16 SMS2 1.00 CONV-E
02-02-2023 16 SMS2 1.00 CONV-D
02-02-2023 16 SMS2 9.00 14.00 5.00 CCM-1
02-02-2023 16 SMS2 10.00 13.15 3.15 CCM-2
02-02-2023 16 SMS2 6.05 10.00 3.55 CCM-2
02-02-2023 16 SMS2 7.15 9.00 1.45 CCM-1
02-02-2023 16 SMS2 9.00 18.45 9.45 CONV-D
02-02-2023 18 WRM2 22.10 22.25 0.15 MILL
02-02-2023 18 WRM2 0.15 MILL
02-02-2023 18 WRM2 0.30 MILL
02-02-2023 18 WRM2 17.00 18.40 1.40 MILL
02-02-2023 18 WRM2 0.30 MILL
02-02-2023 18 WRM2 0.20 MILL
02-02-2023 18 WRM2 0.10 MILL
02-02-2023 18 WRM2 0.30 MILL
02-02-2023 18 WRM2 12.00 12.30 0.30 MILL
02-02-2023 18 WRM2 7.00 7.40 0.40 MILL
02-02-2023 18 WRM2 0.15 MILL
02-02-2023 18 WRM2 0.30 MILL
02-02-2023 18 WRM2 0.10 MILL
02-02-2023 18 WRM2 0.15 MILL
02-02-2023 18 WRM2 9.00 10.30 1.30 MILL
02-02-2023 18 WRM2 8.15 8.25 0.10 MILL
02-02-2023 18 WRM2 0.15 MILL
02-02-2023 19 SBM 1.20 MILL
02-02-2023 19 SBM 0.15 MILL
02-02-2023 19 SBM 0.40 MILL
02-02-2023 19 SBM 1.50 MILL
02-02-2023 19 SBM 2.00 MILL
02-02-2023 19 SBM 1.00 MILL
02-02-2023 19 SBM 0.20 MILL
02-02-2023 19 SBM 1.15 MILL
02-02-2023 19 SBM 10.05 14.00 3.55 MILL
02-02-2023 20 STM 2.30 6.00 3.30 MILL
02-02-2023 20 STM 2.00 3.00 1.00 MILL
02-02-2023 20 STM 1.30 2.30 1.00 MILL
02-02-2023 20 STM 23.00 23.30 0.30 MILL
02-02-2023 20 STM 0.15 MILL
02-02-2023 20 STM 22.15 22.30 0.15 MILL
02-02-2023 20 STM 0.40 MILL
02-02-2023 20 STM 0.10 MILL
02-02-2023 20 STM 0.20 MILL
02-02-2023 20 STM 0.05 MILL
02-02-2023 20 STM 0.15 MILL
02-02-2023 20 STM 0.05 MILL
02-02-2023 20 STM 0.10 MILL
02-02-2023 20 STM 0.15 MILL
02-02-2023 20 STM 0.15 MILL
02-02-2023 20 STM 0.05 MILL
02-02-2023 20 STM 0.10 MILL
02-02-2023 20 STM 11.30 12.15 0.45 MILL
02-02-2023 20 STM 6.00 6.20 0.20 MILL
02-02-2023 20 STM 12.30 12.50 0.20 MILL
02-02-2023 20 STM 10.00 10.10 0.10 MILL
Sub Eqpt agency Descr Contd Material Rake
GPL-2 MIS TELESTACKING N ICC
GPL-1 MIS WAGON LOADING C ICC
CC-34 O CHUTE JAM N ICC
MIS TELESTACKING N ICC
ID IDLE C
ID IDLE C
CC-44,125 O OVER LOAD N ICC
GPL-2 O COAL CHANGES TO CN ICC
CC-25,28,8,108SD U/SD N
E ON CC-37 B/CONV SI N ICC
E ON CC-104 B/CONV S N ICC
E ON CC-104 SLEWING N ICC
CC-49 M CONV JOINT PATCHI N ICC
CC-49 M CONV JOINT PATCHI N ICC
GPL-2 MIS TELESTACKING N ICC
GPL-2 M CC-34 35 CONV OFF N ICC
GPL-2 O STREAM CLG N ICC
GPL-2 O STREAM CLG N ICC
MIS GPL DELAY N ICC
MIS GPL DELAY N ICC
GPL-1 O STREAM CLG N ICC
GPL-1 O TRAILER UNLOADER N ICC
GPL-1 M CC-40 , 43CONV OFF N ICC
CO-24 O BRS ACTED N SMS-LS
M ON CO-8A B/WHEEL-2 C
C RAKE COUPLING N SMS-LS
ID IDLE C
ID IDLE C
ID IDLE N
ID IDLE C
ID IDLE C
ID IDLE N
C RAKE COUPLING N BF-DOLO
SD WBRC-6A U/SD C
CO-77 M J/PATCHING N
WBRC SD ON CO-6A U/SD C
CRUSHER-1 M COUPLING PROB-LOCC
C RAKE COUPLING N IOF
ID IDLE N
ID IDLE N
OC-21A E CHUTE SENSOR PRO N I-O-F
SD U/SD N I-O-L
CO-34 SD U/SD N
BRC SD ON CO-31 U/SD N
CO-6,9,12,84 SD U/SD N
O HOPPER CLEANING N I-O-F
S OUT HAUL SIDE TRA N I-O-F
O HOPPER CLEANING N BF-LS
S PTY CHG N BF-LS
TB STKR O ON CO-19 OVER LOADN BF-LS
CO-47,49 M JOINT OPENED N I-O-L
C RAKE COUPLING N I-O-F
C RAKE COUPLING N BF-LS
EXH-3 I TRIPPED-LUB PUMP N
EXH-3 I TRIPPED-LUB PUMP N
EXH-3 I TRIPPED-LUB PUMP N
EXH-3 I TRIPPED-LUB PUMP N
EXH-3 I LUB PUMP PLC PROB N
EXHAUSTER-3 I TRIPPED-LUBE PUMP N
SD PUSHINGS REGULATEN
PC-1 M HELD UP-SPILLAGE N
SD PUSHINGS REGULATEN
SD PUSHINGS REGULATEN
MS PUSHINGS REGULAT N
MS PUSHINGS REGULAT N
MS PUSHINGS REGULAT N
MS PUSHINGS REGULAT N
TRACK-1 M 14 RS- PINION PROB C
Y-23A M MOTOR PROB N
SCREEN-79,80 O CLEANING N
PC-3 M LEVELER BAR ROPE N
CHAMBER-8 SD U/SD FOR BOILER CE C
CHAMBER-16 M ROTARY DEVICE JAM C
CHAMBER-13 SD BRICK LINING DAMAGC
CHAMBER-11 SD U/SD C
CHAMBER-1 SD U/SD C
CC-4 M C/S YOKE BASE BENDN
ROUTE-B SD 10 ROLLER SCREEN UC
BENZOL PLAN SD STREAM-2 U/SD- LOW CJ
Y-4 M GREASING N
DE E DE TROLLEY LINE PO N
Y-125 SD U/SD N
S PROCESS DIST-MICRON
C PROCESS DIST-DIRECN
M PALLET CHG N
OA-2 C R/CHUTE INSPECTIONN
MS IOF SUPPLY DELAY N
M PROCESS DISTURBANC
N
C-08 M BELT J/PATCHING N
MIS BF CONVY STOPPED N
MIS BF CONVY STOPPED N
M PALLET CHG N
M PALLET CHG N
OA-2 C R/CHUTE INSPECTIONN
MS IOF SUPPLY DELAY N
MS IOF SUPPLY DELAY- N
H CRUSH(RMPP
SD U/SD C
C CRUS-5 M ROLLS DAMAGED C
C CRUS-2,7 M ROLLS NOT AVAILABLC
C-07,8,9 O CHUTE CLEANING N
S BASE MIX SHORTAGE N
ID DDS N
OA-2 C R/CHUTE INSP N
S COKE SHORTAGE - P N
MS I-O-F SUPPLY DELAY N
CU-1 M BELT THROUGH CUT N
MIS POOR COKE STOCK-FC
O CHRG PAD PATCHINGN
TH O CHANGING N
ID IDLE C
O U/P(ALL STRANDS CHC
ID IDLE N
O U/P(RESTART FAILUR N
ID IDLE N
O U/P AFTER SD JOBS N
SD U/SD FOR RADIAL PO N
ID IDLE N
ID IDLE N
O U/P(HEAT DELAY-HIGHN
ID IDLE N
O U/P(HEAT DELAY-STCN
O U/P(HEAT ELAY- MIX N
MIXER M CRANE-1 U/PPM N
O LINEING SCANNING N
STC-2 P CABLE CUT N
MIXER CR-1 SD U/SD N
C MILL STABILISATION N 16R
LINE-1 O S-21 PASS ADJ N 16r
S-5 M GREASE CHG N 16r
C MILL CHKG N 16r
C HEAT CHG N
S GAS CV FLUCTUATIO N
C MILL CHKG N
C MILL STABLISATION N 16R
C MILL STABILISATION N
SD U/SD FOR WEEKLY MAN 16R
SD U/SD FOR WEEKLY MAN
LINE-4 C FB TAIL END COBBLE N 8R
LINE-2,4 C RING CHG N 8R
C 2 COIL UNLOADING- N 8R
C FB CHECKING N 8R
C MILL CHECKING N 8R
LINE-2 S BAD METAL COBBLE- N 8R
LINE-1,2 M NO HOOKS N 8R
LINE-1,2 C RING CHG N 8R
FB C CHKG N 8R
C NO HOOKS-2 COIL U N 8R
S-13/2 C E/GUIDE CHG N 8R
C MILL CHKG N 8R
C F/C SOAKING N 8R
C CFC JAM N 8R
C TWO COIL U/LOADINGN 8R
FB C FB CHKG N 8R
IM C IM PASS BURNING N 8R
C MILL CHKG N 8R
C SAMPLE CUTTING ON N BLT125
LHS C BRAKING FLAPS TRIP N BLT125
E IMT COBBLE N BLT125
S-13 E TRIPPED N BLT125
F/C-1 E HYDRAULIC PROB N BLT125
C MILL CHECKING N BLT125
C SLOW ROLLING-LOW N BLT 125
E BAY LIGHTING OFF N BLT 125
C SLOW ROLLING-LOW N BLT 125
O SAMPLE CUTTING DE N BLT 125
C MILL STABILISATION N BLT 125
F/C-1 MS SINGLE F/C ROLING N BLT90
C MILL CHECKING N BLT90
SD SECTION CHG TO BLTN BLT125
SD U/SD FOR ELECTRIC C
GSB-1 O SEC-1 BREAKER FLA C
S HAND TRIPPED - BF3 C
ID IDLE C
S TRIPPED - LOW STEA C
SD HAND TRIPPED-CAPITC
S TRIPPED - LBSS-3 Z C
TR-3 E LBSS-3 - TR-3 TRIPPE C
TR-2 E TRIPPED C
M MAIN DRIVE MOTOR-2N
S RED SPOT - LOWER C
MS HOT METAL SHORTA N
MS HOT METAL SHORTA N
O U/P(S-1 D/BAR SLIP, C
ID IDLE N
O U/P(PL.CLOSURE) N
ID IDLE C
ID IDLE N
ID CONVERTER U/STANDC
ID IDLE N
O U/P AFTER SD N
O U/P(S-3 TRT HIT,HMS) N
MS HOT METAL SHORTA N
MS HOT METAL SHORTA N
SD U/SD FOR PPM JOBS N
ID IDLE N
O U/P(PLANNED CLOSU N
O U/P(PLANNED CLOSU N
SD U/GCP FOR JAM CLEAN
C GRADE SEGREGATIO N 16P
C HEAT CHG N 16P
C MILL CHECKING N 16P
LINE-A M STELMOR CHAIN SNAN 16P
C GRADE SEGREGATIO N 16P
C GRADE CHG N 16P
C HEAT CHG N 16P
C MILL CHKG N 16P
LINE-A MS PFM COBBLE- BAD M N 16P
LINE-A C RSM RING CHG N 16P
C HEAT AND GRADE CHN 16P
C MILL CHECKING N 16P
E UNLOADER PROB N 16P
C GRADE SEGGREGATI N 16P
S-13 C PASS CHG N 16P
M STOPPER-10 PROB N 16P
S-6 O REST BAR TIGHTENINN 16P
O HEAD/TAIL END BENDN
C HEAT CHG GAP N
O COBBLE ON C/BED N
O SLOW ROLLING-HEADN
S-18 O EXIT GUIDE HOUSINGN
S-18 O EXIT GUIDE KNOCKE N
S-18 O EXIT GUIDE PROB N
S-18 C CHANGING N
O HEAD AND TAIL BENDN
SD SECTION CHANGE OVC
FMT M ARM BEARING DAMAGE
N
COOLINGBED M L1 L2 COOLING BED N
IMT M PLATE WELDING [@SHN
C SAMPLE CHECKING AN
C MILL CHECKING AND N
COOLINGBED C LINE 1 AND LINE 2 C N
FINISHINGAREC LINE 2 SAW 1 BLADE N
C MILL CHECKING AND N
FINISHINGAREM LINE 2 APRON PLATE N
FINISHINGAREM LINE 2 SIDE STACKERN
FINISHINGAREE LINE 2 STRAPPING M N
FINISHINGAREC LINE 2 STRAPPIG MA N
COOLINGBED M LINE 1 LAYER FORMINN
COOLINGBED O LINE 1 LAYER FORMINN
FINISHINGAREM LINE 2 WHEEL STOPPN
COOLINGBED O BAR JUMBLED IN LIN N
M STAND 11 AND 14 CA N
C MILL CHECKING AND N
C SAMPLE CHECKING AN
ROLLERTABLEE CHARGING GRID SECTI
N
Cum Delay Delay Code Freq Close Dt Eff Durn
1.00 1.00 1.00
8.00 1.00 8.00
1.30 1.00 1.50
8.05 1.00 0.08
32.00 000 1.00 24.00
47.45 000 1.00 24.00
1.10 1.00 1.17
1.00 2.00 1.00
8.00 100 1.00 8.00
0.30 1.00 0.50
1.00 1.00 1.00
0.45 1.00 0.75
1.00 1.00 1.00
2.15 1.00 2.25
2.00 1.00 2.00
1.00 1.00 1.00
0.30 1.00 0.50
0.45 1.00 0.75
0.30 1.00 0.50
0.20 1.00 0.33
1.00 1.00 1.00
0.35 1.00 0.58
0.45 2.00 0.75
1.00 1.00 1.00
6.00 1.00 6.00
0.45 121 1.00 0.75
17.15 000 1.00 17.25
23.10 000 1.00 23.17
15.25 000 1.00 15.42
12.20 000 1.00 12.33
1.35 000 1.00 1.58
5.30 000 1.00 5.50
0.40 121 1.00 0.67
24.00 100 1.00 24.00
2.15 1.00 2.25
712.00 1.00 24.00
945.25 1.00 24.00
1.00 121 1.00 0.83
7.35 000 1.00 4.33
8.45 000 1.00 7.75
1.00 1.00 1.00
8.20 100 1.00 8.33
7.15 100 1.00 7.25
8.15 100 1.00 8.25
8.15 100 1.00 8.25
0.45 134 2.00 0.75
1.00 143 1.00 1.00
0.30 134 2.00 0.50
0.20 1.00 0.33
0.25 1.00 0.42
3.40 270 1.00 3.67
0.35 121 1.00 0.58
0.50 121 1.00 0.83
2.30 1.00 2.50
2.15 1.00 2.25
1.45 1.00 1.75
2.00 1.00 2.00
1.15 1.00 1.25
2.20 1.00 2.33
1.15 100 1.00 1.25
4.10 1.00 4.17
6.00 100 1.00 6.00
3.30 100 1.00 3.50
3.30 1.00 3.50
3.00 1.00 3.00
1.15 1.00 1.25
1.15 1.00 1.25
20.00 1.00 20.00
2.00 1.00 2.00
1.00 1.00 1.00
18.30 1.00 10.50
1,437.00 100 1.00 05/02/2023 24.00
51.00 1.00 24.00
3,696.00 1.00 04/02/2023 24.00
192.00 1.00 05/02/2023 24.00
192.00 1.00 10/02/2023 24.00
33.00 1.00 7.00
576.00 100 1.00 24.00
208.00 100 1.00 24.00
1.30 1.00 1.50
1.35 1.00 1.58
7.10 100 1.00 7.17
0.20 1.00 0.33
0.30 1.00 0.50
0.20 1.00 0.33
0.20 1.00 0.33
1.00 1.00 1.00
0.40 1.00 0.67
0.40 1.00 0.67
0.20 450 1.00 0.33
0.20 450 1.00 0.33
0.20 475 1.00 0.33
0.20 1.00 0.33
0.20 1.00 0.33
2.00 1.00 2.00
2.00 110 1.00 2.00
2,520.00 100 1.00 24.00
1,672.00 1.00 24.00
1,768.00 1.00 24.00
0.20 1.00 0.33
0.40 060 1.00 0.67
3.00 000 1.00 3.00
0.20 1.00 0.33
1.00 110 1.00 1.00
3.00 110 1.00 3.00
24.30 1.00 10.50
8,808.00 550 1.00 24.00
1.00 638 1.00 1.00
1.00 628 1.00 1.00
12.30 000 1.00 12.50
3.05 1.00 3.08
2.00 000 1.00 2.00
3.35 1.00 3.58
1.50 000 1.00 1.83
1.00 1.00 1.00
10.00 100 1.00 10.00
24.45 000 1.00 10.75
19.00 000 1.00 4.00
4.10 1.00 4.17
1.25 000 1.00 1.42
5.55 1.00 5.92
1.20 1.00 1.33
1.00 1.00 1.00
1.00 1.00 1.00
1.10 1.00 1.17
9.30 100 1.00 9.50
1.00 711 1.00 1.00
0.10 776 1.00 0.08
0.10 1.00 0.17
0.15 1.00 0.25
0.15 718 1.00 0.25
0.10 130 1.00 0.17
0.15 770 1.00 0.25
1.00 1.00 1.00
0.30 1.00 0.50
15.00 1.00 15.00
14.30 1.00 14.50
1.00 1.00 0.25
0.40 1.00 0.33
0.10 875 1.00 0.17
0.10 870 1.00 0.17
0.15 870 1.00 0.25
0.20 1.00 0.08
0.10 1.00 0.08
0.40 1.00 0.33
0.10 1.00 0.17
0.10 1.00 0.17
0.10 1.00 0.17
0.15 870 1.00 0.25
0.10 871 1.00 0.17
0.10 808 1.00 0.17
0.15 1.00 0.25
0.10 1.00 0.17
0.10 1.00 0.17
0.15 1.00 0.25
0.30 1.00 0.50
0.30 1.00 0.50
0.40 1.00 0.67
0.20 1.00 0.33
0.10 1.00 0.17
0.20 770 1.00 0.33
1.05 970 1.00 1.08
0.15 1.00 0.25
1.15 970 1.00 1.25
0.30 1.00 0.50
1.00 770 1.00 1.00
1.30 1.00 1.50
0.30 770 1.00 0.50
6.00 1.00 6.00
1.30 100 1.00 1.50
2,052.55 1.00 24.00
10,459.25 1.00 24.00
6,777.00 000 1.00 24.00
8,677.15 1.00 24.00
2,246.30 100 1.00 01/03/2023 24.00
2,773.35 1.00 24.00
2,782.00 1.00 24.00
2,773.15 1.00 24.00
6.20 1.00 6.33
635.30 1.00 24.00
3.00 643 1.00 3.00
3.00 643 1.00 3.00
13.50 1.00 13.83
1.00 000 1.00 1.00
1.00 1.00 1.00
17.00 000 1.00 17.00
2.20 000 1.00 2.33
1,464.00 000 1.00 24.00
52.05 000 1.00 4.17
4.30 1.00 4.50
1.55 1.00 1.92
1.00 643 1.00 1.00
1.00 643 1.00 1.00
5.00 100 1.00 5.00
3.15 000 1.00 3.25
3.55 1.00 3.92
1.45 1.00 1.75
9.45 100 1.00 9.75
0.15 1.00 0.25
0.15 855 1.00 0.25
0.30 870 1.00 0.50
1.40 1.00 0.83
0.30 1.00 0.50
0.20 1.00 0.33
0.10 855 1.00 0.17
0.30 870 1.00 0.50
0.30 1.00 0.25
0.40 1.00 0.33
0.15 1.00 0.25
0.30 870 1.00 0.50
0.10 1.00 0.17
0.15 1.00 0.25
1.30 1.00 1.50
0.10 1.00 0.17
0.15 1.00 0.25
1.20 1.00 1.33
0.15 1.00 0.25
0.40 1.00 0.67
1.50 1.00 1.83
2.00 1.00 2.00
1.00 1.00 1.00
0.20 1.00 0.33
1.15 1.00 1.25
3.55 1.00 3.92
3.30 1.00 3.50
1.00 1.00 1.00
1.00 1.00 1.00
0.30 1.00 0.50
0.15 1.00 0.25
0.15 1.00 0.25
0.40 1.00 0.67
0.10 1.00 0.17
0.20 1.00 0.33
0.05 1.00 0.08
0.15 1.00 0.25
0.05 1.00 0.08
0.10 1.00 0.17
0.15 1.00 0.25
0.15 1.00 0.25
0.05 1.00 0.08
0.10 1.00 0.17
0.45 1.00 0.75
0.20 1.00 0.33
0.20 1.00 0.33
0.10 1.00 0.17
Eqpt Run Time Tot Delay ID CR SD O M
CT-1 24.00 24.00
CT-2 24.00 24.00
OT-1 6.42 17.58 14.83 0.92
OT-2 5.00 19.00 16.67 0.75
OT-3 6.83 17.17 15.42 1.00
OT-4 0.83 23.17 23.17
OT-5 5.92 18.08 17.25
BATTERY-1 21.50 2.50
BATTERY-2 19.50 4.50 1.25
BATTERY-3 13.25 10.75 6.00
BATTERY-4 14.75 9.25 3.50
BATTERY-5 21.50 2.50
M/C-1 21.67 2.33 1.00
M/C-2 20.67 3.33 3.00
M/C-3 20.83 3.17 0.33 1.33
RMB 18.00 6.00
RMPP 21.00 3.00
F/C-1 24.00
F/C-2 24.00
F/C-3 24.00
CCM-1 4.08 19.92 5.83 10.00 4.08
CCM-2 14.25 9.75 2.00 7.75
CCM-3 16.67 7.33 1.42 5.92
CCM-4 13.25 10.75 10.75
CCM-5 10.17 13.83 12.50 1.33
CCM-6 24.00
CONV-A 21.00 3.00 2.00 1.00
CONV-B 21.83 2.17 1.00
CONV-C 24.00
BAR MILL 6.50 17.50 15.00 0.08 0.17
BILLET MIL 8.33 15.67 14.50
WRM 20.42 3.58 0.08
MMSM 9.42 14.58 6.00 0.50
CCM-1 10.42 13.58 2.33 5.00 6.25
CCM-2 14.83 9.17 4.25 4.92
CCM-3 5.08 18.92 17.00 1.92
CCM-4 6.00 18.00 4.17 13.83
CONV-D 10.25 13.75 9.75
CONV-E 20.00 4.00
CONV-F 24.00 24.00
WRM2 17.00 7.00 0.25 1.00
SBM 11.42 12.58 11.08
STM 13.42 10.58 3.50 0.42 3.92
E I S C MS MIS P IR R

0.33 1.50
1.00 0.58
0.75

0.83
1.25 1.25
2.00 1.25
1.75 3.00
2.25 3.50
2.50
1.00 0.33
0.33
1.00 0.50
1.00 5.00
3.00

24.00

1.17

2.25
0.17 1.00
0.08 3.42
1.42 5.17 1.50

4.00
4.00

0.17 5.33 0.25


1.50
0.25 2.50
W X