Input Data OD 28 711.20
Pipeline Volume WT 0.69 17.5
ID 26.62 676.15
Pipeline I.D in inches 26.62 Inches
Pipeline Length in Mts 203850 Mts
Test Pressure 130 Barg
Volume to pressurise
Chemical Requirement
FLOODING RATES
Volume of pipeline m3 73195.46 M3 16103000.76 Gallon 73195458.02 Ltr
Volume per Mtr 0.3591 M3 78.99 Gallon 359.07 Ltr
Duration
Pig Speed per second M3/ sec m3/min Gall/sec Ltr/sec Gallon/minute Minutes Hours Days
0.125 0.045 2.69 9.87 44.88 592.46 27180 453 18.9
0.25 0.090 5.39 19.75 89.77 1184.92 13590 227 9.4
0.375 0.135 8.08 29.62 134.65 1777.37 9060 151 6.3
0.5 0.180 10.77 39.50 179.53 2369.83 6795 113 4.7
0.625 0.224 13.46 49.37 224.42 2962.29 5436 91 3.8
0.75 0.269 16.16 59.25 269.30 3554.75 4530 76 3.1
0.875 0.314 18.85 69.12 314.18 4147.20 3883 65 2.7
1 0.359 21.54 78.99 359.07 4739.66 3398 57 2.4
COMPRESSOR SPREAD
Pressure in barg 9
% loss - A.D's & BSTR 10 %
Pump rt/min on spec's 1100
True output scf/min 990
Scf rate / min No' of Comp Ttl output Duration Duration
Pig Speed mts pr second M3/ sec SCF/sec required needed Scf/min Hours Days
0.125 0.045 1.59 855.92 1 856 453.0 19
0.25 0.090 3.17 1711.84 2 1712 226.5 9
0.375 0.135 4.76 2567.76 3 2568 151.0 6
0.5 0.180 6.34 3423.68 3 3424 113.3 5
0.625 0.224 7.93 4279.60 4 4280 90.6 4
0.75 0.269 9.51 5135.51 5 5136 75.5 3
0.875 0.314 11.10 5991.43 6 5991 64.7 3
1 0.359 12.68 6847.35 7 6847 56.63 2
Breakdown of symbols.
Enter Max O.D of Pipe in mm 711.20 Dmax
Pi = Internal design pressure in N/mm2
Enter Min wall thickness in mm 17.5 tmin Pe = External design pressure in N/mm2
Dmax = Maximal external diameter of pipe (mm) including fabrication
tolerence.
% of SMYS in N/mm2 322.2 tmin = Minimal wall thickness (mm)
Sy = Tensile Hoop stress ( N/mm2
Sy 2tmin Psi
0 0.000 0 0 0 0
0 0.000 0 0 0 0
0 0.000 0 0 0 0
0 0.000 0 0 0 0
0 0.000 0 0 0 0
0 0.000 0 0 0 0
COMPRESSOR SPREAD
Pressure in barg 9
% loss - A.D's & BSTR 10 %
Pump rt/min on spec's 1100 THEORETICAL CALCULATIONS
True output scf/min 990
Scf rate / min No' of Comp Ttl output Duration Duration
Pig Speed mts/second M3/ sec SCF/sec required needed Scf/min Hours Days
0.125 0.04 1.59 856 1 855.91908654 453.0 19
0.25 0.09 3.17 1712 2 1711.8381731 226.5 9
0.375 0.13 4.76 2568 3 2567.7572596 151.0 6
0.5 0.18 6.34 3424 3 3423.6763462 113.3 5
0.625 0.22 7.93 4280 4 4279.5954327 90.6 4
0.75 0.27 9.51 5136 5 5135.5145193 75.5 3
0.875 0.31 11.10 5991 6 5991.4336058 64.7 3
1 0.36 12.68 6847 7 6847.3526923 56.6 2
Pig velocity
Input Gas/Air Flowrate SCFM 34567
Volume/metre M3 0.36
Input Pipeline Press (Bar-g) 9 ACTUAL CALCULATIONS
Pig Location
Input Total Volpumped SCF 45678923
Input Volume/metre M3 0.36
Input Pipeline Press (Bar-g) 9
Pigging Duration
Page 6
Pipeprofile
957.21 528.6
943.14 554.3
929.64 602.3
1000
918.55 680
903.45 700.5
889.81 624
876.14 615
800
862.09 666
848.73 746
836.33 742
822.46 785
Hieght in mts
600
808.71 814
794.72 719
780.72 674
755.88 688
400
743.26 760
731.5 748
715.27 756
704.13 765
2001
692.12 769.3
680.34 788
669.19 827.1
657.41 845
0
645.56 885.8
95 94 92 91 90 88 87 86 84 83 82 80 79 78 75 74 73 71 70 69 68 66 65 64 63 61 60 58 57 56 54 52 51 49 48 46 45 42
630.2 919.7 7. 3. 9. 8. 3. 9. 6. 2. 8. 6. 2. 8. 4. 0. 5. 3. 1. 5. 4. 2. 0. 9. 7. 5. 0. 8. 7. 7. 6. 5. 7. 8. 1. 5. 3. 6. 0. 8.
618.4 913.2 21 14 64 55 45 81 14 09 73 33 46 71 72 72 88 26 5 27 13 12 34 19 41 56 2 4 8 44 4 23 6 54 54 95 14 67 4 72
607.8 884.8
587.44 842.3 Chainage in Km's
576.4 883
565.23 920
Page 7
Pipeprofile
547.6 940.7
528.54 1040
511.54 1039.4
495.95 1005.8
483.14 1001
466.67 932
450.4 961.9
428.72 934.5
413.97 943.4
398.83 904
385.34 945.8
374.41 989.4
361.81 966.8
347.09 945.8
332.37 918.4
317.36 911.4
301.37 880.9
286.3 865.9
273.54 863.1
255.39 850.1
241.88 833.6
228.35 800.4
215.68 799
201.32 827.8
185.22 907.1
165.4 992.4
145.5 855
130.59 910.1
115.59 1032.1
102 1105
100.55 618.1
82.96 449.9
67.99 267.9
60.45 210
59.2 213.1
Page 8
Pipeprofile
49.71 167.9
31.47 110
11.9 24.1
-7.5 10.1
Page 9
Pipeprofile
86 84 83 82 80 79 78 75 74 73 71 70 69 68 66 65 64 63 61 60 58 57 56 54 52 51 49 48 46 45 42 41 39 38 37 36 34 33 31 30 28 27 25 24 22 21 20 18 16 14 13 11 10 10 82 67 60 59 49 31 11 -
2. 8. 6. 2. 8. 4. 0. 5. 3. 1. 5. 4. 2. 0. 9. 7. 5. 0. 8. 7. 7. 6. 5. 7. 8. 1. 5. 3. 6. 0. 8. 3. 8. 5. 4. 1. 7. 2. 7. 1. 6. 3. 5. 1. 8. 5. 1. 5. 5. 5. 0. 5. 2 0. .9 .9 .4 .2 .7 .4 .9 7.
09 73 33 46 71 72 72 88 26 5 27 13 12 34 19 41 56 2 4 8 44 4 23 6 54 54 95 14 67 4 72 97 83 34 41 81 09 37 36 37 3 54 39 88 35 68 32 22 4 5 59 59 55 6 9 5 1 7 5
Chainage in Km's
Page 10
ProfileChart48
1200
1000
800
600
Hieght in mts
400
200
1
0
9 9 9 9 9 8 8 8 8 8 8 8 7 7 7 7 7 7 7 6 6 6 6 6 6 6 6 5 5 5 5 5 5 4 4 4 4 4 4 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 1 1 1 1 1 11 8 6 6 5 4 3 1 -
5 4 2 1 0 8 7 6 4 3 2 0 9 8 5 4 3 1 0 9 8 6 5 4 3 1 0 8 7 6 4 2 1 9 8 6 5 2 1 9 8 7 6 4 3 1 0 8 7 5 4 2 1 0 8 6 4 3 1 0 0 2. 7. 0. 9. 9. 1. 1. 7.
7. 3. 9. 8. 3. 9. 6. 2. 8. 6. 2. 8. 4. 0. 5. 3. 1. 5. 4. 2. 0. 9. 7. 5. 0. 8. 7. 7. 6. 5. 7. 8. 1. 5. 3. 6. 0. 8. 3. 8. 5. 4. 1. 7. 2. 7. 1. 6. 3. 5. 1. 8. 5. 1. 5. 5. 5. 0. 5. 2 0. 9 9 4 2 7 4 9 5
21654810734777825211314524844265591647983480333353836324555 5695 17
1445514933612286 7324916 4 3 44547 2734119767 4985822 99 5
Chainage in Km's
Page 11
ProfileChart48
11 8 6 6 5 4 3 1 -
0 0 2. 7. 0. 9. 9. 1. 1. 7.
2 0. 9 9 4 2 7 4 9 5
5695 17
5
Page 12
Flow
Throughput in m3/min 33
Speed in Metres/sec 1.54
Page 13