Site 3x20 3x10 n blst 3x20

RSS-1 138 0 12
RSS-2 98 18 12
DG1-1 180 6 12
DG1-2 156 4 12
DSB 169 0 12
DSG-2 89 10 12
DSG-1 118 34 12
DUM 80 10 12
Total 1028 82 12
Total

dimensi ballast
panjang 0.7 m
lebar 0.7 m
tebal 0.2 m
volume 0.098 m3
1656 23.6571428571429

Site N blst tot Voume ballast + Pedestal (m3) Add 10% (m3)
RSS-1 1656 235 259
RSS-2 1320 188 207
DG1-1 2208 314 346
DG1-2 1904 271 299
DSB 2028 288 317
DSG-2 1148 163 180
DSG-1 1688 240 264
DUM 1040 148 163
TOTAL 12992 1847 2035
254.375

Inverter

Site n Inverter Volome Pondasi Volume Total


RSS-1
23 0.168 3.864
RSS-2
DG1-1
32 0.168 5.376
DG1-2
DSB
38 0.168 6.384
DSG-2 38 0.168 6.384
DSG-1
DUM 8 0.168 1.344

PJUTS

Site n PJU Volome Pondasi Volume Total


RSS-1
9 0.375 3.375
RSS-2
DG1-1
8 0.375 3
DG1-2
DSB
DSG-2 12 0.375 4.5
DSG-1
DUM 3 0.375 1.125

Penangkal Petir

Site n LP Volome Pondasi Volume Total


RSS-1
4 0.96 3.84
RSS-2
DG1-1
4 0.96 3.84
DG1-2
DSB
DSG-2 5 0.96 4.8
DSG-1
DUM 1 0.96 0.96

panjang 0.3
kedalaman 0.4
Tray
DG 1
Dimensi lebar Tray (mm) Panjang (m) Qty Pondasi m3/pondasi
200 890 742 0.0264
400 10 9 0.0528
500 610 509 0.066
600 334 279 0.0792
DSS
200 856 714 0.0264
400 20 17 0.0528
500 261 218 0.066
600 261 218 0.0792
RSS
150 382 319 0.0198
200 341 285 0.0264
300 131 110 0.0396
400 134 112 0.0528
500 4 4 0.066
600 5 5 0.0792
DUM
150 146 122 0.0198
200 107 90 0.0264
300 31 26 0.0396
400 19 16 0.0528
500 5 5 0.066

Box Grounding

Site n LP Volome Pondasi Volume Total


RSS-1
15 0.056 0.84
RSS-2
DG1-1
13 0.056 0.728
DG1-2
DSB
DSG-2 16 0.056 0.896
DSG-1
DUM 6 0.056 0.336

PIPA
Panjang (m) qty ballast m3/ballast total volume ballast
DG1
2230 1593 0.0198 32
DSS
1980 1415 0.0198 29
RSS
1500 1072 0.0198 22
DUM
570 408 0.0198 9
Alkindi Yahya:
tinggi pedestal tanpa threshold 20 cm Alkindi Yahya:
tinggi pedestal setelah ad

n blst 3x10 N blst 3x20 N blst 3x10 N blst tot


8 1656 0 1656
8 1176 144 1320
8 2160 48 2208
8 1872 32 1904
8 2028 0 2028
8 1068 80 1148
8 1416 272 1688
8 960 80 1040
8 12336 656 12992
24672 1312 25984
Alkindi
penampang pedestal Yahya:
panjang volume ballast 0.17 m
kalo gak ada
lebar penebalan 0.17 m
area 0.0289 m2
0.141908212560386 m3/n

398
466 235.2 317
530
645 457
487
276
761 406
163 250
Rp 1,800,000.00 3121
Rp 3,663,000,000.00
Rp 3,771,432,000.00 Rp 108,432,000.00

Site N blst tot Voume ballast + Pedestal (m3)


10% RSS-1 1656 235
RSS-2 1320 188
4.2504
DG1-1 2208 314
DG1-2 1904 271
5.9136
DSB 2028 288
DSG-2 1148 163
7.0224
7.0224 DSG-1 1688 240
DUM 1040 148
1.4784 TOTAL 12992 1847

Items Qty Satuan


10% Ballast SNI 2020 tanpa Pedestal 3121 m3
screw pile CIF JKT 12882 set
3.7125
Screw Driver 16 set
Selisih
3.3

Note : USD to IDR 15000


4.95

1.2375

Site N blst tot Volume Ballast (m3)


RSS-1 1656 398
10% RSS-2 1320 317
DG1-1 2208 530
4.224
DG1-2 1904 457
DSB 2028 487
4.224
DSG-2 1148 276
DSG-1 1688 406
5.28 DUM 1040 250
TOTAL 12992 3121
1.056

jumlah volume Site N blst tot


20 RSS-1 1656
1 RSS-2 1320
34 DG1-1 2208
23 DG1-2 1904
DSB 2028
19 DSG-2 1148
1 DSG-1 1688
15 DUM 1040
18 TOTAL 12992

7
8
5
6
1
1

3
3
2
1
1

10%
1

1
Alkindi Yahya:
tinggi pedestal setelah ada threshold 20 cm

3x20
Vol, m 3
h ped
162.3
129.4
216.4 605.9
186.6 345.7
198.7
112.5
165.4
101.9 361.8
1273.2
2546.4

Ballast SNI 2020 tanpa Pedestal


398
317
530
457
487
276
406
250
3121
14.2 $ 184,486.40
Rp 1,750,000.00
harga/satuan Jumlah
Rp 1,750,000.00 Rp 5,461,750,000.00
Rp 249,000.00 Rp 3,207,618,000.00
Rp 60,000,000.00 Rp 960,000,000.00
sih

715

Volume Ballast (m3) Total Volume


264
210 474
352
303
323 978
183
269
166 618
2070 2070
Alkindi Yahya:
volume penebalan
ballast karena
mengakomodasi
threshold 20 cm

3x20 3x10
h ped_c h ped h ped_c

549.3 16.0 14.7


234.4 2.9 0.0

335.5 6.2 2.4

Site N blst tot


RSS-1 1656
RSS-2 1320
DG1-1 2208
DG1-2 1904
DSB 2028
DSG-2 1148
DSG-1 1688
DUM 1040
TOTAL 12992
Rp 2,748,847,360.00
Rp 5,461,750,000.00
Total #VALUE!
Rp 5,461,750,000.00 #VALUE!
Rp 4,167,618,000.00
Rp 1,294,132,000.00

Alamat
PT. Pertamina Hulu Rokan Rumbai, Jl. Camp Rumbai, Lembah Damai,
Kec. Rumbai Pesisir, Kota Pekanbaru, Riau 28266

PT. Pertamina Hulu Rokan Duri, Jl. Gate 1, Titian Antui, Kec. Pinggir,
Kabupaten Bengkalis, Riau 28784

PT. Pertamina Hulu Rokan Dumai, Jl. Bukit Jin Camp, Bukit Timah, Kec.
Dumai Bar., Kota Dumai, Riau 28826
total
h ped h ped_c vol. ped, m3 % ped h ped - h ped_c vol. blst. Add., m3

621.9 564.0 16.3 0.1 57.9 28.3


348.5 234.4 6.8 0.0 114.1 55.9

368.1 337.9 9.8 0.1 30.2 14.8

32.8 99.1

17.9726499 234.4
0.281653532609

175.767487425 193.3442
140.104518962 154.115
234.3566499 257.7923
202.0901546239 222.2992
215.2514882234 236.7766
121.8484755821 134.0333
179.163960612 197.0804
110.3853785761 121.4239
1378.968113904 1516.865 Rp 1,900,000.00
Rp 2,882,043,358.06
Rp 3,771,432,000.00 Rp 889,388,641.94
% add

0.1
0.3

0.1