Vous êtes sur la page 1sur 6

OBJET : ASSAINISSEMENTtamtkalte

METRE DES TRAVAUX -

Cote des trançon


Tronçon Largeur Profondeur de tranchée Lit de pose (m³) Volume Remblai Longueur buse PEHD C
Dimensions CTN CR Epaisseur Remblai
Canalisation Longueur (m) de fouille Fouille (m³) Conduite secondaire
(mm) Paroi Buse primaire (m³)
Amont Aval (m) Amont Aval Amont Aval Amont Aval Moyenne SABLE GRAVIERS (m³) (m³) 250 300
Coll 1
DN400
R1 R2 400.00 34.45 0.9000 1,134.3100 1,134.1100 1,132.6300 1,132.5260 1.7900 1.6940 1.7420 0.0100 54.0107 3.1005 4.7728 17.5508 28.5866 0.0000 0.0000
PEHD CR 8

DN400
R2 R3 400.00 74.2700 0.9000 1,134.1100 1,134.1800 1,132.5260 1,132.4000 2.2000 1.6800 1.9400 0.0100 129.6754 6.6843 10.2897 37.8373 74.8642 0.0000 0.0000
PEHD CR 8

DN400
R3 R4 400.00 41.6500 0.9000 1,134.1800 1,134.3200 1,132.4000 1,132.1900 1.7800 2.2400 2.0100 0.0100 75.3448 3.7485 5.7704 21.2188 44.6071 0.0000 0.0000
PEHD CR 8

DN400
R4 R5 400.00 38.8500 0.9000 1,134.3200 1,134.5400 1,132.1900 1,132.1700 2.2400 2.4800 2.3600 0.0100 82.5174 3.4965 5.3824 19.7924 53.8461 0.0000 0.0000
PEHD CR 8

DN400
R5 R6 400.00 35.1700 0.9000 1,134.5400 1,134.7100 1,132.1700 1,131.8800 2.4800 2.9400 2.7100 0.0100 85.7796 3.1653 4.8726 17.9176 59.8242 0.0000 0.0000
PEHD CR 8

DN400
R6 R7 400.00 35.0600 0.9000 1,134.7100 1,134.7400 1,131.8800 1,131.8600 2.9400 2.9900 2.9650 0.0100 93.5576 3.1554 4.8574 17.8615 67.6833 0.0000 0.0000
PEHD CR 8

DN400
R7 R8 400.00 44.4500 0.9000 1,134.7400 1,134.9000 1,131.8600 1,131.7000 2.9900 3.3100 3.1500 0.0100 126.0158 4.0005 6.1583 22.6453 93.2117 0.0000 0.0000
PEHD CR 8

DN400
R8 R9 400.00 35.0000 0.9000 2.2500 0.0100 70.8750 3.1500 4.8490 17.8310 45.0450 0.0000 0.0000
PEHD CR 8

DN400
R9 R10 400.00 39.0000 0.9000 2.2900 0.0100 80.3790 3.5100 5.4032 19.8688 51.5970 0.0000 0.0000
PEHD CR 8

DN400
R10 R11 400.00 40.0000 0.9000 2.3900 0.0100 86.0400 3.6000 5.5418 20.3782 56.5200 0.0000 0.0000
PEHD CR 8

DN400
R11 R12 400.00 40.0000 0.9000 2.7500 0.0100 99.0000 3.6000 5.5418 20.3782 69.4800 0.0000 0.0000
PEHD CR 8

DN400
R12 R13 400.00 41.0000 0.9000 2.7000 0.0100 99.6300 3.6900 5.6803 20.8877 69.3720 0.0000 0.0000
PEHD CR 8
Coll 2
DN400
R1 R2 400.00 23.6 0.9000 1,134.7700 1,134.7600 1,133.7900 1,133.6400 1.0900 1.2300 1.1600 0.0100 24.6384 2.1240 3.2696 12.0232 7.2216 0.0000 0.0000
PEHD CR 8

DN400
R2 R3 400.00 36.6500 0.9000 1,134.7600 1,134.8200 1,133.6400 1,133.4500 2.2000 1.6800 1.9400 0.0100 63.9909 3.2985 5.0776 18.6716 36.9432 0.0000 0.0000
PEHD CR 8

DN400
R3 R4 400.00 15.3900 0.9000 1,134.8200 1,134.7600 1,133.4500 1,133.2600 2.2000 1.6800 1.9400 0.0100 26.8709 1.3851 2.1322 7.8405 15.5131 0.0000 0.0000
PEHD CR 8

DN400
R4 R7 400.00 17.9500 0.9000 1,134.7600 1,134.7400 1,133.2600 1,131.8600 2.2000 1.6800 1.9400 0.0100 31.3407 1.6155 2.4869 9.1447 18.0936 0.0000 0.0000
PEHD CR 8
Coll 3
DN300
R1 R2 300.00 28.42 0.9000 1,134.1900 1,134.1300 1,133.1900 1,132.7700 1.1100 1.4700 1.2900 0.0100 32.9956 2.5578 2.2857 13.5727 14.5795 0.0000 28.4200
PEHD CR 8

DN400
R2 R2 400.00 28.0100 0.9000 1,134.1300 1,134.1100 1,132.7700 1,132.5260 2.2000 1.6800 1.9400 0.0100 48.9055 2.5209 3.8806 14.2699 28.2341 0.0000 0.0000
PEHD CR 8
Coll 4
DN300
R1 R2 300.00 20.46 0.9000 1,134.5900 1,134.3100 1,133.3600 1,133.1700 1.3400 1.2500 1.2950 0.0100 23.8461 1.8414 1.6455 9.7712 10.5880 0.0000 20.4600
PEHD CR 8

DN300
R2 R4 300.00 35.1700 0.9000 1,134.3100 1,134.3200 1,133.1700 1,132.1900 2.2000 1.6800 1.9400 0.0100 61.4068 3.1653 2.8285 16.7963 38.6167 0.0000 35.1700
PEHD CR 8
Coll 5

Page 1
DN300
R1 R3 300.00 17.12 0.9000 1,134.1400 1,134.1800 1,132.8100 1,132.4000 1.4400 1.8900 1.6650 0.0100 25.6543 1.5408 1.3769 8.1761 14.5606 0.0000 17.1200
PEHD CR 8
Coll 6
DN400
R1 R2 400.00 22.96 0.9000 1,134.3800 1,134.3600 1,132.9500 1,132.7000 1.5400 1.7700 1.6550 0.0100 34.1989 2.0664 3.1810 11.6971 17.2544 0.0000 0.0000
PEHD CR 8

DN400
R2 R1 400.00 30.4400 0.9000 1,134.3600 1,134.3100 1,132.7000 1,132.6300 2.2000 1.6800 1.9400 0.0100 53.1482 2.7396 4.2173 15.5078 30.6835 0.0000 0.0000
PEHD CR 8
Coll 7
DN300
R1 R2 300.00 41.54 0.9000 1.3700 0.0100 51.2188 3.7386 3.3408 19.8385 24.3009 0.0000 41.5400
PEHD CR 8

DN300
R2 R1 300.00 23.3400 0.9000 1.5400 0.0100 32.3492 2.1006 1.8771 11.1466 17.2249 0.0000 23.3400
PEHD CR 8
Coll 8
DN400
R1 R2 400.00 6.68 0.9000 1.0000 0.0100 6.0120 0.6012 0.9255 3.4032 1.0822 0.0000 0.0000
PEHD CR 8

DN400
R2 R2 400.00 22.7400 0.9000 1.3600 0.0100 27.8338 2.0466 3.1505 11.5850 11.0516 0.0000 0.0000
PEHD CR 8
Coll 9
DN400
R1 R2 400.00 12.21 0.9000 1.0000 0.0100 10.9890 1.0989 1.6916 6.2205 1.9780 0.0000 0.0000
PEHD CR 8
Coll 10
DN300
R1 R2 300.00 26.54 0.9000 1.1200 0.0100 26.7523 2.3886 2.1345 12.6748 9.5544 0.0000 26.5400
PEHD CR 8
Coll 11
DN300
R1 R2 300.00 24.34 0.9000 1.3000 0.0100 28.4778 2.1906 1.9575 11.6242 12.7055 0.0000 24.3400
PEHD CR 8

Totaux 1,693.45 83.92 0.00 116.58 468.13 1,024.82 0.00 216.93

Page 2
AINISSEMENTtamtkalte

DES TRAVAUX -

Longueur buse PEHD CR8 (ml)

400

34.4500

74.2700

41.6500

38.8500

35.1700

35.0600

44.4500

35.0000

39.0000

40.0000

40.0000

41.0000

23.6000

36.6500

15.3900

17.9500

0.0000

28.0100

0.0000

0.0000

Page 3
0.0000

22.9600

30.4400

0.0000

0.0000

6.6800

22.7400

12.2100

0.0000

0.0000

715.53

Page 4
Maitre d'ouvrage: O.R.M.V.A DE OUARZAZATE
N° Marché: 65/2021/OR/OZ
Titulaire du marché:SOCIETE2LL HMI SARL
Objet du marché: TRAVAUX D'ASSAINISSEMENT LIQUIDE DE LA CITE AGRICOLE ET DES LOCAUX ADMINISTRATIFS
DE TAMTKALTE MINUCIPALITE DE OUARZAZATE PROVINCE DE OUARZAZATE
PARTIE RESERVEE AU TITULAIRE DU MARCHE

ATTACHEMENT N°3 ET DERNIER

DU 19/12/2022

Attachement Attachement Attachement Prix total Prix total


précédent courant cumulé Prix total
Unité de Prix unitaire . Attachement Attachement
N° Attachement
Désignations des prestations mesure ou de (Hors TVA) courant(Hors cumulé(Hors
Prix précédent(Hors
compte En chiffres. TVA)en TVA)en
TVA)en chiffres
chiffres chiffres
A- INSTALLATION DE CHANTIER
1 INSTALLATION DU CHANTIER Ft 1.00 0.00 1.00 20,000.00 20,000.00 0.00 20,000.00
B- TERRASSEMENTS
Déblais et remblais en tranchées

Fouille en tranché sur toutes profondeurs en terrain de toute


2 m3 1975.25 170.00 1693.45 40.00 79,010.00 6,800.00 85,810.00
nature y/c Rocher.

Ramblais pour fouilles en pleine masse

3 Remblai primaire primaire m3 532.25 69.91 468.13 10.00 5,322.50 699.10 6,021.60
4 Remblai secondaireprimaire m3 1190.00 75.02 1024.82 10.00 11,900.00 750.20 12,650.20
Lit de pose
5 Sable pour lit de pose m3 76.75 14.64 83.92 90.00 6,907.50 1,317.60 8,225.10
C - CANALISATIONS
Fourniture, stockage, transport et pose des
6 canalisations

Fourniture, transport et pose des conduites DN 400 en


6-a PEHD CR8 ml 580.10 21.40 715.53 300.00 174030.00 6420.00 180450.00

Fourniture, transport et pose des conduites DN 300 en ml


6-b PEHD CR8 270.50 233.50 216.93 200.00 54100.00 46700.00 100800.00

D - OUVRAGE ANEXE
7 GENIE CIVIL DE REGARD DE VISITE Y COMPRIS TOMPONS U 27.00 5.00 31.00 4000.00 108000.00 20000.00 128000.00
8 Regard borgne U 25.00 7.00 32.00 800.00 20000.00 5600.00 25600.00
9 Branchement Double U 2.00 0.00 2.00 1500.00 3000.00 0.00 3000.00
10 Branchement Simple U 37.00 6.00 37.00 1000.00 37000.00 6000.00 43000.00
DIVERS
11 TRAVERSE CHAUSSEE ml 21.50 0.00 21.50 400.00 8600.00 0.00 8600.00
12 beton armé pour toute ouvrage eventuels m3 0.00 5.62 5.62 1000.00 0.00 5620.00 5620.00
TOTAL HT 527870.00 99906.90 627776.90
TOTAL TVA 20% 105574.00 19981.38 125555.38
TOTAL TTC 633444.00 119888.28 753332.28

RECAPITULATION
OBJET TOTAL COURANT TOTAL CUMULE
TOTAL HORS TVA 99906.90 627776.90
TAUX DE TVA EN POURCENTAGE 0.20 20%
MONTANT DE LA TVA 19981.38 125555.38
TOTAL TTC 119888.28 753332.28

SIGNE PAR LE TITULAIRE DU MARCHE


PARTIE RESERVEE A L'ADMINISTRATION

DATE DE DEPOT DE L'ATTACHEMENT PAR


LE TITULAIRE DU MARCHE (2)

Vérifié et signé par l'agent chargé du suivi de


Vérifié et signé par le maitre d'œuvre (4)
l'exécution (3)

Fait le: …………………… Fait le: ………………

Le chef du bureau Le chef du service

Le directeur de l'ORMVA de Ouarzazate

Fait le: …………………………………..

(*): L'attachement est établi par l'entrepreneur, au moins à la fin de chaque mois au plus tard,pour les marchés de travaux et de
fourniture (art 61 du CCAGT-T), et par le service pour les marchés de services (études, services etc), Il doit être accompagné de la
facture pour les marchés de fournitures et de services

(1):Se conformer au bordereau des prix du marché sans aucun changement


(2): Obligatoire pour calculer le délai de service fait

(3):Délai de rectification fixé à 15j et délai de certification fixé à 30 jours si non l'attachement est réputé accepté (Art 61 du CCAG-T)

(4): Bureau d'étude, Assistance technqiue, Architecte, Bureau du contrôle etc.

NB: Toute information supprimée est suscceptible d'obstruer le calcul des délai d'xécution, d'ordonnacement, de paiement, de