ÉCOLE ÉLÉMENTAIRE F.

JOLIOT-CURIE
EXTENSION ET MISE EN ACCESSIBILITÉ
24 RUE F.JOLIOT-CURIE 94600 CHOISY-LE-ROI

AVANT PROJET DÉTAILLÉ


PRÉSENTATION - CONSEIL DE QUARTIER GONDOLES NORD DU 25/01/2018

25 janvier 2018
ÉTAT EXISTANT
RAPPEL DES OBJECTIFS PROGRAMME

MISE EN ACCESSIBILITÉ TOTALE DE AGRANDISSEMENT DU RESTAURANT SCOLAIRE CONSTRUCTION DE DEUX SALLES DE CLASSES
L’ÉTABLISSEMENT
-CRÉATION DE 42 PLACES SUPPLÉMENTAIRES
-SURFACE PROGRAMME: 248M2 MINIMUM
RÉORGANISATION DES LOCAUX TECHNIQUES -ORGANISATION SPATIALE ADAPTABLE EN SELF CRÉATION D’UN PÔLE DIRECTION
DU PERSONNEL SERVICE OU SERVICE À TABLE ADMINISTRATION
PROJET
PLAN MASSE

EXTENSION DU EXTENSION CLASSES ENTRÉE PRINCIPALE EMPLACEMENT


RÉFECTOIRE R+2 Accès PMR DU PARKING À
L’ÉTUDE

BÂTIMENT PLOT
VOIE ACCÈS POMPIERS HORS PÉRIMÈTRE LOCAUX MODULAIRES
PROJET - ARCHITECTURE
VOLUMÉTRIE GÉNÉRALE
PROJET - IDENTIFICATION DES ESPACES
PLAN GÉNÉRAL NIVEAU REZ-DE-CHAUSSÉE
LOCAUX TECHNIQUES PÔLE CUISINE ENTRÉE ANNEXE LOCAUX VÉLOS TERRASSE ENTRÉE
ASCENSEUR MOTOS PRINCIPALE
Accès PMR

PATIO - JARDIN
POTAGER ACCESSIBLE PÔLE ADMINISTRATIF RÉAMÉNAGEMENT HALL DE
VOLUME EXTENSION RÉFECTION DES
DEPUIS L’EXTÉRIEUR ET DE DIRECTION SORTIE suppression coup de pouce
DU RESTAURANT SANITAIRES F/G et création portes entrée/sortie
PROJET - IDENTIFICATION DES ESPACES
PLAN GÉNÉRAL - RÉAMÉNAGEMENT NIVEAU R+1

BUREAU PSYCHOLOGIE SAS ASCENSEUR


INFIRMERIE CRÉE
PROJET - IDENTIFICATION DES ESPACES
PLAN GÉNÉRAL - EXTENSION DES CLASSES NIVEAU R+2

CRÉATION DE TROIS SAS ASCENSEUR


SALLES DE CLASSES CRÉE

CONSTRUCTION DES CLASSES SUR LA


TOITURE DE L’AILE OUEST DU BATIMENT
EXISTANT.

SURRÉLÉVATION CONSTRUITE EN
LOCAUX DU PERSONNEL
STRUCTURE BOIS OU MÉTAL PRÉFABRIQUÉ
ENTRETIEN OU MODULAIRE.
PROJET - IDENTIFICATION DES ESPACES
PLAN GÉNÉRAL - RÉAMÉNAGEMENT NIVEAU R+3

SAS ASCENSEUR
CRÉE
PROJET - ARCHITECTURE
FAÇADE NORD

ENTRÉE PRINCIPALE PYLÔNE ASCENSEUR PANNEAUX DE BAR- COUVERTURE ZINC


OSSATURE MÉTALLIQUE DAGE TEINTÉS DANS TOÎTURE DU
BARDAGE TRANSLUCIDE LA MASSE BLANCS RÉFECTOIRE
(POLYCARBONATE) FIBRO-CIMENT OU
CÉRAMIQUE

TRAITEMENT DE LA CLÔTURE:
BARDAGE A CLAIR-VOIE BOIS
AUTOCLAVÉ
PROJET - ARCHITECTURE
FAÇADE OUEST

PANNEAUX DE BARDAGE BRISES SOLEIL MENUISERIES ALU


TEINTÉS DANS LA MASSE RAPPORTÉS
BLANCS FIBRO-CIMENT OU FIBRO-CIMENT
CÉRAMIQUE OU BOIS LASURÉ

STRUCTURE FORMANT
BRISE SOLEIL

ALLÈGE FIBRO-CIMENT OU
CÉRAMIQUE BLANCHES
PROJET - ARCHITECTURE
FILIÈRE SÈCHE

BOIS ET PANNEAUX LÉGERS POIDS DES OUVRAGES ET DES TEMPS D’INTERVENTION ET FILIÈRE SÈCHE STRUCTURE
FAVORISANTS LES PERFORMANCES FONDATIONS MINIMISÉS FACILITÉ DE MISE EN OEUVRE PRÉFABRIQUÉE BOIS OU MÉTAL-
THERMIQUES ET ACOUSTIQUES EN SITE OCCUPÉ LIQUE POUR LES DEUX EXTENSIONS
PROJET - ARCHITECTURE
VUE DU BÂTIMENT DEPUIS LA RUE JOLIOT-CURIE
PROJET - ARCHITECTURE
PLAN DU PARKING 24-27 RUE JOLIOT CURIE




  

0ð
0ð 0ð

3/$&(6
'217305


3HQWH 





  


 
    

'HVLJQ)LUP 6KHHW7LWOH
32/,6&23(
UXH0DU['RUPR\ (VTXLVVH)DLVDELOLWp

3$5,6
3URMHFW7LWOH
3$5.,1*$(5,(1
'UDZLQJ&RGH
 GHO HFROHpOpPHQWDLUH
3URMHFW,'
-2/,27&85,( )5('(5,&-2/,27&85,(
'DWH
6(37(0%5( UXH)-ROLRW&XULH&KRLV\OH5RL
3/$16ZY[
&$')LOH1DPH 'UDZLQJ1R
'UDZQ%\
&KHFNHG%\ RI 7RWDO6KHHWV
RÉFÉRENCES
BÂTIMENTS - EXEMPLES DE TRAMES ET DE BARDAGES
RÉFÉRENCES
BÂTIMENTS - EXEMPLES DE AUVENTS ET COUVERTURES POLYCARBONATE
RÉFÉRENCES
POTAGER PÉDAGOGIQUE

P.ZUMTHOR -SERPENTINE GALLERY,


KENSINGTON GARDENS, ARCHITECTURE, PETER ZUMTHOR, PRITZKER PRICE

GA ARCHITECTES-ÉCOLE CHEDID
SAINT NAZAIRE
APPROCHE FINANCIÈRE - APD
ESTIMATION DÉFINITIVE DU COÛT PRÉVISIONNEL DES TRAVAUX

ESTIMATION 1 - DU COÛT ESTIMATION 2 - DU COÛT


PRÉVISIONNEL DES PRÉVISIONNEL DES
TRAVAUX AU STADE APS 1 382 000 EUROS TTC TRAVAUX AU STADE APD 1 342 000 EUROS TTC SOIT UNE DIFFÉRENCE DE
(NON COMPRIS EXTENSION (NON COMPRIS EXTENSION 40 000 EUROS INFÉRIEURE
COMPLÈTE ) COMPLÈTE ) AU COÛT D’OBJECTIF

ESTIMATION 3 - COÛT COÛT GLOBAL OPÉRATION


PRÉVISIONNEL DES TRA- PRÉVISIONNEL INSCRIT AU
VAUX AU STADE APD (COM- 1 545 000 EUROS TTC PPI 1 920 000 EUROS TTC
PRENANT EXTENSION COM-
PLÈTE )

COÛT GLOBAL OPÉRATION


PRÉVISIONNEL
2 083 000 EUROS TTC
(COMPRENANT EXTENSION
COMPLÈTE )

Les subventions accordées


1. Dotation de soutien à l’investissement territorial (480 000 euros).
2. Subvention parlementaire (assemblée nationale) (25000e).

Subvention au titre du contrat régional (dossier de demande en cours d’élaboration).


PLANNING
LES GRANDES PHASES DU PROJET

25-09-2017 19-10-2017
9 0 20 10-11-2017
0 20 15-11-2017
20
LANCEMENT DES ÉTUDES 12-10-2017 COPIL : PRESENTATION CONSEIL ÉCOLE BUREAU MUNICIPAL
DE CONCEPTION VALIDATION ESQ-APS APD EN COURS PRESENTATION APD VALIDATION APD

01-02-2018
01-12-2017 LANCEMENT
ÉTUDE PRO-VALIDATION 21-12-2017 15-01-2018 CONSULTATION 01-03-2018
ESTIMATIF APD DÉPÔT DE PC REMISE ÉTUDES PRO-DCE MARCHÉ DE TRAVAUX REMISE DES OFFRES

07-07-2018 RENTRÉE SCOLAIRE 2018


01-04-2018
DÉMARRAGE TRAVAUX LIVRAISON DU RÉFECTOIRE
SIGNATURE DU MARCHÉ
RÉFECTOIRE + CLOS COU- + POLE DIRECTION
LANCEMENT DES MAI JUIN -2018
VERT SURÉLEVATION + SANITAIRES PRÉAU
ÉTUDES D’EXECUTION CHANTIER FONDATIONS

RENTRÉE SCOLAIRE 2019


EN COURS D’ANNÉE DÉBUT JUILLET 2019 LIVRAISON DES SALLES DE
2018/2019 DÉMARRAGE TRAVAUX CLASSE ET LOCAUX
MISE EN ACCESSIBILITÉ D’AMÉNAGEMENT INTE- PERSONNEL
RIEURS SURÉLÉVATION