LAMINACION DE EMBALSE
caudal de vertedero
Hidrograma de entrada 14
(sale de estudio hidrologico) Qs=CLH_e^1.
12 5
t [hr] Q [m³/s] 10 C= 2.21
Q [m³/s]
0.0 0.0 8 L= 5.91 [m]
1.5 12.0 6 0.459
3.0 4.0 4
7.0 0.0 2
0
0 1 2 3 4 5 6 7 8
Tiempo t [hr]
100 0 103.0
102 0.5 102.0
101.0
104 1 100.0
106 1.5 99.0
98.0
97.0
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6
h [m]
diferencia de tiempo
1
entre intervalos
Qi [m³/s] h [m] Qs [m³/s] A [10³m²] Dh calc [m]
(hidrograma de curva ∆ℎ=( 〖 (𝑄 〗 _(𝑖,𝑡)+𝑄_(𝑖,𝑡+∆𝑡))−(𝑄_(𝑠,𝑡)
Qs=CLH_e^1 +𝑄_(𝑠,𝑡+∆𝑡)))/(𝐴_𝑡+𝐴_(𝑡+∆𝑡) ) ∆𝑡
t [hr] entrada) altura area .5
0.000 0.000 0.000 0.000 100.00 0.216
0.192
0.196
0.195
Chart Title
4.000 3.000 0.51 4.811 102.06 -0.064
0.468 4.177 101.87 -0.057 Qi [m³/s] Qs [m³/s]
0.479 4.327 101.92 -0.059 14.000
0.476 4.291 101.90 -0.058
0.477 4.300 101.91 12.000
10.000
2.000
6.000 1.000 0.455 4.010 101.82 -0.092
0.366 2.896 101.47 -0.074 0.000
0 2 4 6 8 10 12 14
0.386 3.131 101.54 -0.077
0.382 3.081 101.53 -0.076
0.383 3.092 101.53 -0.076
BORDO LIBRE
datos
cota de lecho del rio 4088 msnm
cota del nivel maximo normal 4115 msnm
cota del nivel de avenida de proyecto 4116.50 msnm
longitud de arremetida maxima F 12.3 NMN (Km)
15.1 NAP(km)
profundidad media a lo largo de F 18.8 m
pendiente del paramento mojado 1 V
2.5 H
angulo de F con la normal al eje presa 10 grados
S=(1.545∗10^(−5)∗v^2∗F)
/ℎ^−
S 0.26 m S 0.079 m
T=0.15456∗𝑣^(1/3)∗𝐹^(1/3)
(113.5+𝑣)^(1/6)
T 4.935 s T 3.959 s
L=1.56∗𝑇^2
L 37.99 m L 24.45 m
ε=(1.25∗T∗tanα)/
√𝐻𝑠
ε 1.0464 ε 1.23
R=Hs∗(A∗ε+C)* ƴt*ƴb*ƴh*ƴɞ
ƴt liso 1 ƴt liso 1
pasto 0.9 pasto 0.9
Rip -Rap 0.5-0.6 0.55 Rip -Rap 0.5-0.6 0.55
ƴb 1 ƴb 1
ƴh 1 ƴh 1
ƴɞ 0.97777778 ƴɞ 1
A C A C
ε <= 2.5 1.6 0 1.6 A ε <= 2.5 1.6 0 1.6 A
2.5 < ε < 9 0.2 4.5 0C 2.5 < ε < 9 0.2 4.5 0C
R 5.01 m R 2.81 m
BLn=S+R