TRAVAUX MAISON ELMASSIRA FACHARI

DATE DESIGNATION QTE MONTANT


04/04/2023 SABLE LAVE 8m3 880.00
10/04/2023 LES PIECES D’EAU INSTALLATION 60.00
INSTALATION TUBE ORANGE 2 200.00
DALAT TRICIEN
12/05/2023 SABLE LAVE POUR 8m3 880.00
25/03/2023 AVANCE YOUSSEF 3500.00
06/04/2023 AVANCE YOUSSEF 10000.00
30/04/2023 AVANCE YOUSSEF 4000.00

13/04/2023 AVANCE YOUSSEF 12500.00


AVANCE YOUSSEF 4000.00
YOUSSEF LE RESTE 26000.00
FER DE 800.00
PORTE/DWAYA+TRANSPORT
20/06/2023 MAIN DOUVER/SOUDEUR 400.00
400.00
11/06/2023 CADNA/DULIANT+PEINTURE 124.00
PORTE +DWAYA
TOTAL 63744.00
09/08/2023 PVC ABP 2560.00
PVC ABP 631.00
ISMAEIL COMERCEIAL 70.00
PICK UP 50.00
25/08/2023 MAIN D'OEUVRE PLOMBER 800.00
MAIN D'ŒUVRE HAMZA 300.00
BLAISE AU TRAVAIL
SIFON 110.00 2 30.00

04/10/2023 CIMENT CPJ45 POUR MARTOUB 20 1640.16


DECHARGE CIMENT+PICKUP 1 50.00
SABLE OUAD FINT 5M 400.00
06/10/2023 AMESSKANE JAMILA AVANCE - 5000.00
MARIAGE
09/10/2023 SABLE OUAD FINT GHLIDA 5M 500.00

08/10/2023 TUBE PVC 40+COUDE PLOMBER - 55.00

14/10/2023 CIMENT CPJ 45 20 1640.16


TRANSPORT - 50.00
14/10/2023 AVANCE MBARK LMRTOUB 2000.00

17/10/2023 CIMENT CPJ 45 CG 10 820.00


18/10/2023 COLLE DE FAÇADE ROUGE FACOP 3 1350.00
18/10/2023 TRANSPORT 20.00
16/10/2023 FEUX CADRE 40 BARE 6M 4 400.00
16/10/2023 TUBE CARRE 18 2 70.00
16/10/2023 MAIN DEOUVER SOUDEUR 200.00
16/10/2023 TRANSPORT 25.00
21/10/2023 CIMENT 45 CPJ 5 410.00
21/10/2023 AVANCE MBARK LMRTOB 3000.00
23/10/2023 COLLE ROUGE FACADE 494.00
24/10/2023 LE RESTE MABRK LMRTOB 4500.00