Date Désignation Quantité PU

6/14/2023 GRAVETTE CONCASSE 10.00


6/14/2023 SABLE LAVEE 20.00
3/4/2022 AGGLOS 20*20*50 1,000.00 2.40
6/21/2023 AGGLOS 10*15*40 1,700.00 2.40
6/21/2023 CPJ 35 20.00 74.00
6/21/2023 FOURNITURE TOILETTE 1.00 85.00
6/24/2023 Les salaires des ouvriers 5,705.00
7/14/2023 AGGLOS 10*15*40 400.00 1.80
7/14/2023 PVC 200 60.00 75.00
7/14/2023 FIL D'ATTACHE 50.00 11.50
7/14/2023 PT 8T 20.00 11.50
9/17/2023 RLX PLASTIQUE
9/17/2023 SABLE LAVEE 20.00
9/18/2023 MANLLITO
7/19/2023 Fer à béton 06 T 1,880.00 9.60
7/19/2023 Fer à béton 08 T 3,100.00 9.30
7/19/2023 Fer à béton 10 T 3,900.00 9.30
7/19/2023 Fer à béton 12 T 3,220.00 9.30
7/19/2023 Fer à béton 14 T 1,880.00 9.30
7/19/2023 Fer à béton 16 T 1,600.00 9.30
7/19/2023 TS 5*3.5/20*20/6/2.20 100.00 160.00
7/19/2023 Location compacteur tapis (2j) 2.00 200.00
7/22/2023 Béton Armé Fondation BP15-D25 64.00 605.00
7/22/2023 Les salaires des ouvriers
7/25/2023 Fer Lisse 06 T 700.00 12.50
7/26/2023 CPJ 45 160.00 76.50
7/29/2023 PT 8T 10.00 11.50
7/31/2023 SALAIRE LAARBI

TOTAL
Montant Mode de paiement Fournisseur
0.00 ESP MENARA PREFA
0.00 ESP MENARA PREFA
2,400.00 CHQ MENARA PREFA
4,080.00 ESP LHUSSEIN
1,480.00 CHQ
85.00 ESP BN° 23/002429
5,705.00 ESP
720.00 ESP BN° 57
4,500.00 CHQ SBA
575.00 CHQ LF9IH
230.00 CHQ LF9IH
500.00 ESP

18,048.00 CHQ 2100071 STE RITA FER


28,830.00 ESP
36,270.00 145,458.00
29,946.00
17,484.00
14,880.00 CHQ STE VITAL FER
16,000.00 CHQ STE VITAL FER
400.00 ESP
38,720.00 CHQ MENARA PREFA
12,620.00 ESP
8,750.00 ESP
12,240.00 CHQ ESADIR CONSTRUCTION
115.00 CHQ LF9IH
6,000.00 ESP + VIR

260,578.00
Date Désignation Quantité PU
8/1/2023 GRAVETTE CONCASSEE 20.00
8/22/2023 Fer à béton 10 T 1,160.00 9.35
8/22/2023 Fer à béton 14 T 1,800.00 9.35
8/22/2023 Fer à béton 12 T 3,060.00 9.35
8/22/2023 Fer à béton 10 T 3,340.00 9.35
8/22/2023 Fer à béton 08 T 2,880.00 9.35
8/22/2023 Fer à béton 06 T 3,080.00 9.65
8/4/2023 TS 5*3.5 R/20*20/6*2.20-10F 100.00 165.00
8/4/2023 Fer à béton 14 T 996.00 9.20
8/4/2023 Fer à béton 12 T 1,900.00 9.20
8/4/2023 Fer à béton 08 T 2,376.00 9.20
8/5/2023 PT 8T + 6T 15.00 11.50
8/5/2023 FIL D'ATTACHE 25.00 11.50
Fer à béton 12 T 800.00 12.65
Fer à béton 14 T 800.00 12.65
8/5/2023 Fer à béton 10 T 3,980.00 9.40
Cons EAU MOIS 11/12/1/2/3
Béton armé PH RDC BP25-D25 54.00 840.00
PT 8T 10.00 12.00
Fill d'attache 25.00 20.00

Trsp MAT + FER par camion


PT 8T 20.00 12.00
Fer à béton 12 T 1,000.00 12.65
Fer à béton 14 T 2,000.00 12.65
Fer à béton 10 T 700.00 12.65
8/5/2023 Les salaires des ouvriers
8/28/2023 Béton de type B15 Pompe D-MAX 25 12.00 849.50
8/28/2023 Béton de type B25 Pompe D-MAX 25 10.00 900.00
8/28/2023 Béton de type B15 Pompe D-MAX 25 10.00 849.50
8/28/2023 Béton de type B25 Pompe D-MAX 25 5.00 900.00
8/28/2023 Béton de type B25 Pompe D-MAX 25 8.00 900.00
8/28/2023 Béton de type B25 Pompe D-MAX 25 10.00 900.00
8/28/2023 Béton de type B25 Pompe D-MAX 25 12.00 900.00
8/28/2023 Béton de type B25 Pompe D-MAX 25 10.00 900.00
4/16/2022 HORDIS + POUTRELLES
4/19/2022 Location manillito
4/19/2022 COM chauffaur manllito
4/21/2022 HOURDIS H12 + H8 70+15
4/21/2022 Fer à béton 16 T 1,500.00 12.65
4/21/2022 Fer à béton 06 T 1,000.00 12.90
4/21/2022 TS 3.5*3.5/20*30/6/2.20 100.00 90.00
4/21/2022 TRSP TS 1.00 250.00
4/22/2022 Béton armé PH ETAGE BP25-D25 50.00 900.00
4/23/2022 Fill d'attache 25.00 20.00
4/23/2022 PT 8T 20.00 12.00
4/23/2022 PT 6T 10.00 15.00
4/23/2022 Trsp FER par khalid camion
4/25/2022 Trsp FER par dépannage
4/27/2022 DISQUE FER 2.00 15.00
4/28/2022 Fer à béton 12 T 800.00 12.65
4/30/2022 Les salaires des ouvriers
4/30/2022 Primes aid elfitr
4/30/2022 Salaire chef el AARBI

Total
Montant Mode de paiement Fournisseur
0.00 ESP MENARA PREFA
10,846.00 Rita Fer
16,830.00 Rita Fer
28,611.00 Rita Fer 15,320.00
31,229.00 Rita Fer
26,928.00 Rita Fer 144,166.00
29,722.00 Rita Fer
16,500.00 Rita Fer
9,163.20 Rita Fer 48,502.40
17,480.00 Rita Fer 5,272.00
21,859.20 Rita Fer
172.50 ESP MENARA PREFA 106,154.40
287.50 57,652.00
10,120.00
10,120.00
37,412.00 Rita Fer
0.00
45,360.00 CHQ MENARA PREFA
120.00
500.00 OULED ATTOU
0.00 109,040.00
0.00
240.00
12,650.00
25,300.00 46,805.00
8,855.00
0.00 ESP
10,194.00 MENARA PREFA
9,000.00 MENARA PREFA
8,495.00 MENARA PREFA
4,500.00 MENARA PREFA
7,200.00 MENARA PREFA
9,000.00 MENARA PREFA
10,800.00 MENARA PREFA
9,000.00 MENARA PREFA
0.00 CHQ MENARA PREFA
3,500.00 ESP
100.00 ESP
390.60 CHQ MENARA PREFA
18,975.00
12,900.00
9,000.00 STE RITA FER
250.00 STE RITA FER
45,000.00 CHQ MENARA PREFA
500.00 OULED ATTOU
240.00
150.00 OULED ATTOU
500.00
500.00
30.00 ESP
10,120.00
22,725.00 ESP
3,500.00
5,500.00 3000 VIR + 2500 ESP

562,375.00
Date Désignation Quantité PU
9/1/2023 Béton de type B10 GOULOTTE D-MAX 24 8.00 660.00
9/2/2023 Béton de type B10 GOULOTTE D-MAX 25 8.00 660.00
9/5/2023 Béton de type B25 GOULOTTE D-MAX 25 4.00 816.00
9/5/2023 Béton de type B25 GOULOTTE D-MAX 25 7.00 816.00
9/7/2023 Béton de type B25 Pompe D-MAX 25 10.00 900.00
9/7/2023 Béton de type B25 Pompe D-MAX 25 12.00 900.00
9/7/2023 Béton de type B25 Pompe D-MAX 25 12.00 900.00
9/7/2023 Béton de type B25 Pompe D-MAX 25 6.00 900.00
9/12/2023 KECH - PANNEAU 300 X 100 CM 30.00
9/12/2023 KECH - PANNEAU 300 X 50 CM 1.00
9/12/2023 KECH - PANNEAU 300 X 40 CM 1.00
9/12/2023 ANGLE INTERNE 300 X 25 X 20 CM 1.00
9/12/2023 TIGE GALVANISE 30 CM 123.00
9/12/2023 TIGE GALVANISE 100 CM 51.00
9/12/2023 ECROU PAPILLON 348.00
9/12/2023 Béton de type B25 Pompe D-MAX 25 10.00 900.00
9/12/2023 Béton de type B25 Pompe D-MAX 25 8.00 900.00
Ciment CPJ 45 (Sac) 30.00 78.00
9/13/2023
Chargement 1.00 30.00
9/14/2023 Sable Concassé lavé 0/4 mm 20.00 167.50
9/15/2023 Tube PVC Ø32 (m) 21.00 12.00
9/15/2023 Retube Ø16 6.00 7.00
9/15/2023 Robinet jardin 1.00 45.00
9/15/2023 Teflon 1.00 20.00
9/15/2023 Coude à pique 16 1.00 25.00
9/15/2023 Té 16 1.00 30.00
9/15/2023 Tube PVC Ø40 (m) 3.00 13.00
9/15/2023 Coude pression Ø63 2.00 20.00
9/15/2023 Bouchon pression Ø64 1.00 10.00
9/15/2023 Tyan Gaz 7.00 12.00
9/15/2023 Raccord Gaz 1.00 15.00
9/15/2023 Colle Gaz 2.00 2.00

Béton de type B25 Goulotte Avec Adju


9/18/2023 5.00 900.00
Type Hudrofuge
Béton de type B25 Goulotte Avec Adju
9/18/2023 4.00 900.00
Type Hudrofuge
9/19/2023 Béton de type B25 Goulotte D-MAX 24 9.00 816.00
9/20/2023 Béton de type B25 Goulotte D-MAX 25 9.00 816.00
Béton de type B25 Goulotte Avec Adju
9/22/2023 9.50 900.00
Type Hudrofuge
9/20/2023 Tube PVC Ø200 6.00 180.00
9/20/2023 Tube PVC Ø200 12.00 180.00
9/20/2023 Colle PVC 1.00 100.00
9/25/2023 Palissade 1.00 27,432.50
9/26/2023 Location JCB 1.00 2,200.00
9/26/2023 Dépannage 1.00 1,300.00
9/27/2023 Pointe T08 (KG) 10.00
9/27/2023 Balai 2.00

Total
Montant Mode de paiement Fournisseur
5,280.00 MENARA PREFA
5,280.00 MENARA PREFA
3,264.00 MENARA PREFA
5,712.00 MENARA PREFA
9,000.00 MENARA PREFA
10,800.00 MENARA PREFA
10,800.00 MENARA PREFA
5,400.00 MENARA PREFA
AFRIKA FORMWORK
AFRIKA FORMWORK
AFRIKA FORMWORK
158,000.00 AFRIKA FORMWORK
AFRIKA FORMWORK
AFRIKA FORMWORK
AFRIKA FORMWORK
9000 MENARA PREFA
7200 MENARA PREFA
2,340.00 OULED ATTOU
30.00 OULED ATTOU
3,350.00 OULED ATTOU
252.00
42.00
45.00
20.00
25.00
30.00
39.00
40.00
10.00
84.00
15.00
4.00

4,500.00 MENARA PREFA

3,600.00 MENARA PREFA

7344 MENARA PREFA


7344 MENARA PREFA

8,550.00 MENARA PREFA

1,080.00 OULED ATTOU


2,160.00 OULED ATTOU
100.00 OULED ATTOU
27,432.50 CHQ Forgeron Saiid 54865/2 (27432,5 à villa Datti et 27432,5 à villa 693
2,200.00 ESP
1,300.00 ESP
0.00
0.00

296,392.50
tti et 27432,5 à villa 693
Date Désignation Quantité
10/3/2023 Tube PVC Ø200 15.00
10/3/2023 Sable Mer 5.00
10/3/2023 PVC Ø110 1.00
10/3/2023 Chargement 1.00
10/4/2023 Tube PVC Ø200 6.00
10/4/2023 HOURDIS 16X20X52 348.00
10/4/2023 HOURDIS 20X20X52 160.00
10/4/2023 POUTRELLE PMP SISMIQUE 616 10.00
10/4/2023 POUTRELLE PMP SISMIQUE 411 3.00
10/4/2023 POUTRELLE PMP SISMIQUE 311 12.00
10/4/2023 POUTRELLE PMP SISMIQUE 311 10.00
10/4/2023 POUTRELLE PMP SISMIQUE 311 1.00
10/4/2023 HOURDIS 16X20X52 504.00
10/4/2023 HOURDIS 20X20X52 196.00
10/4/2023 POUTRELLE PMP SISMIQUE 411 16.00
10/5/2023 Brique Rouge 6 400.00
10/5/2023 Lanic BL 1.00
10/5/2023 Plâtre 2.00
10/5/2023 Chargement 1.00
10/6/2023 Béton de type B25 Pompe D-MAX 25 4.00
10/6/2023 Béton de type B25 Pompe D-MAX 25 8.00
10/6/2023 Béton de type B25 Pompe D-MAX 25 10.00
10/6/2023 Béton de type B25 Pompe D-MAX 25 11.00
10/6/2023 Béton de type B25 Pompe D-MAX 25 7.00
10/6/2023 Béton de type B15 Pompe D-MAX 25 7.00
10/6/2023 Béton de type B15 Pompe D-MAX 25 7.00
10/6/2023 Béton de type B15 Pompe D-MAX 25 8.00
10/6/2023 Béton de type B15 Pompe D-MAX 25 8.00
10/6/2023 Béton de type B15 Pompe D-MAX 25 10.00
10/10/2023 Béton de type B25 Goulotte D-MAX 25 4.50
10/11/2023 Agglos Rouge 20*20*50 328.00
10/11/2023 Béton de type B25 Goulotte D-MAX 26 4.00
10/13/2023 Béton de type B25 Goulotte D-MAX 25 7.00
10/16/2023 Béton de type B25 Goulotte D-MAX 25 5.00
10/16/2023 Avance ménara préfa 1.00
10/16/2023 Avance sté ITNANE (tranporté par abdelhadi) 1.00
10/16/2023 Palissade Sté MIMIDE 1.00
10/16/2023 Main oeuvre Palissade Sté MIMIDE 1.00
10/16/2023 Echaffaudage 1m 200.00
10/16/2023 Echaffaudage 0,7m 200.00
10/16/2023 Fourchettes 450.00
10/16/2023 Echaffaudage 1m 200.00
10/16/2023 Fer à béton 12 TOR 9.15
10/16/2023 Fer à béton 14 TOR 9.15
10/16/2023 Fer à béton 10 TOR 9.15
10/16/2023 Fer à béton 08 TOR 9.15
10/17/2023 Béton de type B25 Goulotte D-MAX 25 9.00
10/25/2023 Echandelle 4m 150.00
10/25/2023 Tige 1,10m 50.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 4.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 7.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 12.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 11.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
PH RDC
10/27/2023 Béton de type B35 Pompe D-MAX 25 11.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 12.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 8.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 10.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 8.00
10/27/2023 Béton de type B35 Pompe D-MAX 25 11.00
10/30/2023 Echaffaudage 340.00
10/30/2023 Forchettes 150.00

Total
PU Montant Mode de paiement Fournisseur
180.00 2,550.00 OULED ATTOU
15.00 75.00 OULED ATTOU
70.00 OULED ATTOU
5.00 5.00 OULED ATTOU
170.00 1,020.00 OULED ATTOU
0.00 MENARA PREFA
0.00 MENARA PREFA
0.00 MENARA PREFA
0.00 MENARA PREFA
0.00 MENARA PREFA PMP 395
0.00 MENARA PREFA PMP 320
0.00 MENARA PREFA PMP 395
0.00 MENARA PREFA
0.00 MENARA PREFA
0.00 MENARA PREFA
2.30 920.00 OULED ATTOU
90.00 90.00 OULED ATTOU
15.00 30.00 OULED ATTOU
20.00 20.00 OULED ATTOU
900.00 3,600.00 MENARA PREFA
900.00 7,200.00 MENARA PREFA
900.00 9,000.00 MENARA PREFA
900.00 9,900.00 MENARA PREFA
900.00 6,300.00 MENARA PREFA
849.50 5,946.50 MENARA PREFA
849.50 5,946.50 MENARA PREFA
849.50 6,796.00 MENARA PREFA
849.50 6,796.00 MENARA PREFA
849.50 8,495.00 MENARA PREFA
816.00 3,672.00 MENARA PREFA
6.06 1,987.68 MENARA PREFA
816.00 3,264.00 MENARA PREFA
816.00 5,712.00 MENARA PREFA
816.00 4,080.00 MENARA PREFA
100,000.00 100,000.00 CHQ STE ITNANE
5,184.00 5,184.00 CHQ STE MIMIDE
2,100.00 2,100.00 CHQ STE MIMIDE
0.00 CHQ IMRANE MATERIELS A revoir
105.00 21,000.00 IMRANE MATERIELS
100.00 20,000.00 IMRANE MATERIELS
32.50 14,625.00 IMRANE MATERIELS
110.00 22,000.00 VITAL FER
1,000.00 9,150.00 VITAL FER 72,651.00
1,960.00 17,934.00 VITAL FER
4,080.00 37,332.00 VITAL FER
900.00 8,235.00 MENARA PREFA
816.00 7,344.00 LA FERRAILLE
175.00 26,250.00 LA FERRAILLE
70.00 3,500.00 MENARA PREFA
1,038.00 4,152.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 7,266.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 12,456.00 MENARA PREFA
1,038.00 11,418.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 11,418.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 12,456.00 MENARA PREFA
1,038.00 8,304.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 10,380.00 MENARA PREFA
1,038.00 8,304.00 MENARA PREFA
1,038.00 11,418.00
870.00 295,800.00
32.18 4,827.00

Total 848,608.68
Date Désignation Quantité
11/3/2023 Fer à béton 10 TOR 3,040.00

Total
PU Montant Mode de paiement Fournisseur
9.30 28,272.00 STE VITAL FER

Total 28,272.00