Académique Documents
Professionnel Documents
Culture Documents
Composição taxa
horária
131 20.00 1.5 3.0 280 3.70 412 0.15 6.00 0.50
262 20.00 1.5 3.0 336 3.47 599 0.30 12.00 0.65
Custo s/
Total hs Taxa horária Arame Chapa H produção Impostos Comissão Marg.
impostos
6.50 155.56 1,049.64 812.02 1,011.14 2,872.79 1.17 1.05 1.35
6.50 155.56 1,574.46 1,121.57 1,011.14 3,707.17 1.17 1.05 1.35
6.50 155.56 1,836.87 1,059.88 1,011.14 3,907.89 1.17 1.05 1.35
6.50 155.56 2,624.10 1,059.88 1,011.14 4,695.12 1.17 1.05 1.35
6.50 155.56 1,574.46 1,624.03 1,011.14 4,209.63 1.17 1.05 1.35
6.50 155.56 2,624.10 1,624.03 1,011.14 5,259.27 1.17 1.05 1.35
12.65 155.56 4,198.56 1,624.03 1,967.83 7,790.42 1.17 1.05 1.35
12.65 250.00 5,275.73 3,499.29 3,162.50 11,937.52 1.17 1.05 1.35
12.65 155.56 5,248.20 1,624.03 1,967.83 8,840.06 1.17 1.05 1.35
12.65 155.56 6,822.65 1,624.03 1,967.83 10,414.52 1.17 1.05 1.35
15.05 155.46 5,745.02 952.77 2,339.67 9,037.46 1.17 1.05 1.35
6.50 155.56 2,099.28 1,624.03 1,011.14 4,734.45 1.17 1.05 1.35
6.50 155.46 2,624.00 1,766.47 1,010.49 5,400.96 1.17 1.05 1.35
12.65 155.56 8,666.40 2,030.04 1,967.83 12,664.27 1.17 1.05 1.35
12.65 155.56 5,248.20 2,030.04 1,967.83 9,246.07 1.17 1.05 1.35
16.65 155.56 6,822.65 2,030.04 2,590.07 11,442.77 1.17 1.05 1.35
6.50 155.56 2,099.28 2,030.04 1,011.14 5,140.46 1.17 1.05 1.35
6.50 155.56 2,624.10 2,436.05 1,011.14 6,071.29 1.17 1.05 1.35
12.65 155.56 4,220.16 2,691.76 1,967.83 8,879.76 1.17 1.05 1.35
12.65 155.56 3,692.64 2,691.76 1,967.83 8,352.24 1.17 1.05 1.35
8.65 155.56 3,165.12 2,691.76 1,345.59 7,202.48 1.17 1.05 1.35
12.65 155.56 5,248.20 2,436.05 1,967.83 9,652.08 1.17 1.05 1.35
16.65 155.56 6,822.65 2,436.05 2,590.07 11,848.78 1.17 1.05 1.35
6.50 155.56 2,624.10 2,436.05 1,011.14 6,071.29 1.17 1.05 1.35
8.50 155.56 3,673.74 2,436.05 1,322.26 7,432.04 1.17 1.05 1.35
12.65 155.56 5,248.20 2,436.05 1,967.83 9,652.08 1.17 1.05 1.35
16.65 155.56 6,297.84 2,436.05 2,590.07 11,323.96 1.17 1.05 1.35
16.65 155.56 7,872.29 2,436.05 2,590.07 12,898.42 1.17 1.05 1.35
6.50 155.56 2,624.10 2,436.05 1,011.14 6,071.29 1.17 1.05 1.35
8.50 155.56 3,673.74 2,436.05 1,322.26 7,432.04 1.17 1.05 1.35
12.65 155.56 5,248.20 2,436.05 1,967.83 9,652.08 1.17 1.05 1.35
16.65 155.56 6,297.84 2,436.05 2,590.07 11,323.96 1.17 1.05 1.35
16.65 155.56 7,872.29 2,436.05 2,590.07 12,898.42 1.17 1.05 1.35
6.50 155.56 2,099.28 3,248.06 1,011.14 6,358.48 1.17 1.05 1.35
8.50 155.56 3,148.92 3,248.06 1,322.26 7,719.24 1.17 1.05 1.35
8.65 155.56 4,723.38 3,248.06 1,345.59 9,317.03 1.17 1.05 1.35
16.65 155.56 5,773.02 3,248.06 2,590.07 11,611.15 1.17 1.05 1.35
16.65 155.56 7,347.47 3,248.06 2,590.07 13,185.61 1.17 1.05 1.35
Custo s/
Total hs Taxa horária Arame Chapa H produção Impostos Comissão Marg.
impostos
15.05 141.00 5,170.52 952.77 2,122.05 8,245.34 1.17 1.05 1.35
15.05 141.00 4,308.77 1,190.96 2,122.05 7,621.77 1.17 1.05 1.35
Serviço de revestimento
Custo / m² / Camada
TOTAL Valor / m² R$ 502.08
R$ 1,594.16
Serviço de revestimento
Custo / m² / Camada
TOTAL Valor / m² R$ -
R$ 13,674.68 10
R$ 12,640.52 10
Produto vendido Produto Fabricado Revestimentos
0503 8 0602 Espessura Largura cordão Arame
0604 10 0803 2 mm 40 mm 1450
0805 13 1004 3 mm 42 mm 1550
0807 15 1005 4 mm 42 mm 1650
1005 15 1203 5 mm 42 mm 1750
1007 17 1205 6 mm 40 mm 1850
1010 20 1208 7 mm 40 mm 1850
1012 22 1210
1015 25 1213
1020 30 1217
1205 17 1204
1207 19 1505
1210 22 1508
1212 24 1510
1215 27 1513
1505 20 1504
1507 22 1905
1510 25 1908
1510 25 1907
1510 25 1906
1512 27 1910
1515 30 1913
1905 24 1905
1907 26 1907
1910 29 1910
1912 31 1912
1915 34 1915
2005 25 2005
2007 27 2007
2010 30 2010
2012 32 2012
2015 35 2015
2505 30 2504
2507 32 2506
2510 35 2509
2512 37 2511
2515 40 2514
Avanço Y
290
290
290
250
230
210