Académique Documents
Professionnel Documents
Culture Documents
Motor
Moteur Bornes Client Configuration Client
M3 L1/N
3
11 9 7 5 3
L2/L
2
10 8 6 4
L3
1
CO A A
U U
L2/L L3 L1/N X X
S
Transformer 1 2
Board
A2
A2
A1
A1
Heater
C2
C1
19V 23V L Ph
Chauffage Connection for control by voltage
Raccordements pour cde par tension
(Typical) 11 9 7 5 3
2
3
U U
S X X
4
1 2
P11 10 à 60V
9 28
P6
RD 8 27
1 90 à 250V
SIGNALLING
2 TH 7 26
6 25
R3 5 24
4 23 Note: To cancel self holding cmd
R2
3 22 Do not connect terminal 7
2 21 Pour supprimer l'automaintien
R1 20
1 ne pas raccorder la borne 7
Torque Sensor 1
Capteur de Couple
(Typical)
J2
1 2
-
Emergency supply input
POSITION &
3 3
Aux 1 & Aux 2
4 4
Aux1 Configurable command R1 Valve open
5 5
Commande configurable Vanne ouverte
Control by Contact 6 6
See customer configuration
Voir configuration client Aux2 Configurable command R2 Valve closed
P5 7 7
Commande configurable Vanne fermée
1 + 8 8
LOCAL CONTROL
Positioner Board
1 12
4 15
See Sheet 1 See Legend
+ 5 16
P2
Torque transmitter
Voir Folio 1 4-20mA - 6 17 Voir Légende
+ 7 18
Analog input setpoint
- 8 19
1 29
R4
Auxiliary Relays
2 30
See Sheet 1 3 31
RS4
R5
P1
Voir Folio 1 4 32
5 33 Configurable relays board /Carte relais configurable
R6 6 34
7 35
R7 R4 to R7 relays are configurable /Les relais R4 à R7 sont configurables
8 36
18 + Analog input setpoint
Entrée de commande
19 - analogique
Position transmitter option / Option recopie de position
(1)
mA
12 to 32VDC
(1) Possibilité d'utiliser l'alimentation 24 Vcc des bornes 8-9
(1) Possibility to use 24 Vdc supply on terminals 8-9
4 rue d'Arsonval BP 91
95505 GONESSE CEDEX AT/AQ-25 à 50 TRIPHASEE LOGIC
THREE PHASE AT/AQ-25 to 50 LOGIC
www.bernardcontrols.com
Ce plan étant notre propriété, il ne peut être reproduit ou communiqué sans notre autorisation écrite.
This drawing is our property and may not be reproduced or communicated without our written authorization.
M3 L1/N
3
11 9 7 5 3
L2/L
2
10 8 6 4
L3
1
CO A A
U U
L2/L L3 L1/N X X
S
Transformer 1 2
Board
A2
A2
A1
A1
Heater
C2
C1
19V 23V L Ph
Chauffage Connection for control by voltage
Raccordements pour cde par tension
11 9 7 5 3
6 5 4 3 2 1 10 8 6 4
19V 23V L Ph
P7
1
C O A A
COIL
2
3
U U
S X X
4
1 2
P11 10 à 60V
9 28
P6
RD 8 27
1 90 à 250V
SIGNALLING
2 TH 7 26
6 25
R3 5 24
4 23 Note: To cancel self holding cmd
R2
3 22 Do not connect terminal 7
2 21 Pour supprimer l'automaintien
R1 20
1 ne pas raccorder la borne 7
Torque Sensor 1
Capteur de Couple
J2
1 2
-
Emergency supply input
POSITION &
2
TORQUE
3 3
Aux 1 & Aux 2
4 4
Aux1 Configurable command R1 Valve open
5 5
Commande configurable Vanne ouverte
Control by Contact 6
See customer configuration
6 Aux2 Configurable command R2 Valve closed
7 7 Voir configuration client Vanne fermée
P5 Commande configurable
1 + 8 8
LOCAL CONTROL
RS4
CI2802 P1
4 rue d'Arsonval BP 91
95505 GONESSE CEDEX AT/AQ-25 à 50 TRIPHASEE LOGIC
THREE PHASE AT/AQ-25 to 50 LOGIC
See Sheet 2 www.bernardcontrols.com
Voir Folio 2 Ce plan étant notre propriété, il ne peut être reproduit ou communiqué sans notre autorisation écrite.
This drawing is our property and may not be reproduced or communicated without our written authorization.
1 29
R4
Auxiliary Relays
2 30
See Sheet 1 3 31
RS4
R5
P1
Voir Folio 1 4 32
5 33
R6 6 34
7 35
R7 36
8
4 rue d'Arsonval BP 91
95505 GONESSE CEDEX AT/AQ-25 à 50 TRIPHASEE LOGIC
THREE PHASE AT/AQ-25 to 50 LOGIC
www.bernardcontrols.com
Ce plan étant notre propriété, il ne peut être reproduit ou communiqué sans notre autorisation écrite.
This drawing is our property and may not be reproduced or communicated without our written authorization.