Académique Documents
Professionnel Documents
Culture Documents
TD3
21.00
32.00
43.00
54.00
65.00
75.00
0.00
75 m
1
13/02/2015
Y Géométrie de la section
0.400
0.000
0.350
0.300
5.400- 0.250 5.400
0.200
0.150
1.100- 0.100 0.000 1.100
0.050
5.400- 5.400
3.400- 2.600- 0.000 2.600 3.400
-6.000 -4.000 -2.000 0.000 2.000 4.000 6.000
Géométrie de la section
Y 0.400
5.400- 0.300 0.000 5.400
0.200
0.100
5.400- 3.400- 2.600- 0.000 2.600 3.400 5.400
3.400- 2.600- 0.000 2.600 3.400
-6.000 -4.000 -2.000 0.000 2.000 4.000 6.000
Phasage de bétonnage
21.00
32.00
43.00
54.00
65.00
75.00
0.00
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
Jour
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Plot 1 C F F B D
Plot 2 C F F B D
Plot 3 C F F B D
Plot 4 C F F B D
Plot 5 C F F B D
Plot 6 C F F B D
Plot 7 C F F B D
2
13/02/2015
Abscisse des sections 0.00 0.50 4.80 10.50 13.10 21.40 21.50 23.00 29.70 32.50 38.00 43.50 46.30 53.00 54.50 54.60 62.90 65.50 71.20 75.50 76.00
Longueur Plots (m) 10.000 11.000 11.000 11.000 11.000 11.000 10.000
Raidisseurs en Té
MA T1 T1 T1 T1 T1 T1 T1 T1 T1 MA
Montant d'appui
Planification du chantier
Age du plot (jour) Age moyen du
Instant du béton à
Historique du
Plot 1
Plot 2
Plot 3
Plot 4
Plot 5
Plot 6
Plot 7
chargement l'instant t
chargement
(jour) considéré
(jour)
Coulage du plot 3 10 17 24 31 38 45
Plot 1 3 0 0.0
Plot 2 10 7 0 3.5
Plot 3 17 14 7 0 7.0
Plot 4 24 21 14 7 0 10.5
Plot 5 31 28 21 14 7 0 14.0
Plot 6 38 35 28 21 14 7 0 17.5
Plot 7 45 42 35 28 21 14 7 0 21.0
Fin de réalisation
49 46 39 32 25 18 11 4 25.0
de la dalle
Pose chape 85 82 75 68 61 54 47 40 61.0
Superstructures 106 103 96 89 82 75 68 61 82.0
Mise en service 140 137 130 123 116 109 102 95 116.0
3
13/02/2015
Actions permanentes
Retrait du béton
Coefficients d’équivalence
n0
6.16
4
13/02/2015
Charges permanentes
Hauteur Poids Poids Poids Poids Coeff. Poids Coeff. Poids
Etat 1 Nombre Longueur Largeur
Epaisseur linéique surfacique volumique linéique Majoration maxi. Minoration mini.
2 3
u m m m kN/ml kN/m kN/m kN/ml kN/ml kN/ml
Tronçons T1, T3
Semelle sup. 1 1.000 0.045 78.50 3.53 1.00 3.53 1.00 3.53
Ame 1 0.018 2.895 78.50 4.09 1.00 4.09 1.00 4.09
Semelle inf. 1 1.100 0.060 78.50 5.18 1.00 5.18 1.00 5.18
12.80 1.000 12.80 1.000 12.80
Tronçon T2
Semelle sup. 1 1.000 0.055 78.50 4.32 1.00 4.32 1.00 4.32
Ame 1 0.015 2.860 78.50 3.37 1.00 3.37 1.00 3.37
Semelle inf. 1 1.100 0.085 78.50 7.34 1.00 7.34 1.00 7.34
15.02 1.000 15.02 1.000 15.02
Charpente secondaire ( Poids ramené au ml de poutre)
Montants d'appui 4 2.895 0.180 0.014 78.50 0.03 1.00 0.03 1.00 0.03
4 2.895 0.009 0.373 78.50 0.04 1.00 0.04 1.00 0.04
Entretoise d'appui 1 4.980 0.300 0.030 78.50 0.05 1.00 0.05 1.00 0.05
1 4.980 0.016 0.540 78.50 0.04 1.00 0.04 1.00 0.04
1 4.980 0.300 0.030 78.50 0.05 1.00 0.05 1.00 0.05
Raidisseur courant 9 2.895 0.300 0.030 78.50 0.25 1.00 0.25 1.00 0.25
9 2.895 0.016 0.540 78.50 0.23 1.00 0.23 1.00 0.23
Entretoise courante 5 4.980 0.230 0.020 78.50 0.11 1.00 0.11 1.00 0.11
5 4.980 0.009 0.490 78.50 0.10 1.00 0.10 1.00 0.10
5 4.980 0.230 0.020 78.50 0.11 1.00 0.11 1.00 0.11
0.99 1.000 0.99 1.000 0.99
Dalle en béton et coffrage
Dalle béton 0.5 10.800 0.264 25.00 35.64 1.00 35.64 1.00 35.64
Renformis 1 1.000 0.044 25.00 1.10 1.00 1.10 1.00 1.10
Coffrage 0.5 10.800 2.50 13.50 1.00 13.50 1.00 13.50
50.24 1.000 50.24 1.000 50.24
Superstructures
Décoffrage -0.5 10.800 2.50 -13.50 1.00 -13.50 1.00 -13.50
Étanchéité 0.5 7.500 0.030 24.00 2.70 1.40 3.78 0.80 2.16
Revêtement 0.5 7.500 0.080 24.00 7.20 1.40 10.08 0.80 5.76
Corps de trottoir 1 1.650 0.300 25.00 12.38 1.00 12.38 1.00 12.38
Garde-corps 1 0.75 0.75 1.00 0.75 1.00 0.75
9.53 1.416 13.49 0.792 7.55
CHARGES D'EXPLOITATION
Tottoir gauche 1.25 m Entraxe des poutres d 6.000 m
Chaussée 7.50 m Bord chaussée / poutre gauche 0.750 m
Trottoir droit 1.25 m Classe du pont 2 ° Classe
Charge trottoir OUI
Trottoir gauche 1 1.250 1.0 3.0 3.0 -4.375 1.229 -0.229 4.61 0.00
Voie 1 1 3.000 0.9 300 270 0.7 9.0 6.3 -2.250 0.875 0.125 236.25 0.00 16.54 0.00
Voie 2 1 3.000 0.8 200 160 1.0 2.5 2.5 0.750 0.375 0.625 60.00 0.00 2.81 0.00
Voie 3 1 3.000 0.8 100 80 1.0 2.5 2.5 3.750 -0.125 1.125 0.00 -10.00 0.00 -0.94
Aire résiduelle défavorable 0 -2.250
Aire résiduelle favorable 1 -1.500 1.0 2.5 2.5 4.500 -0.250 1.250 0.94 0.00
Trottoir droit 1 1.250 1.0 3.0 3.0 4.375 -0.229 1.229 0.00 -0.86
10
5
13/02/2015
b2 b0 b1 b1 b0 b2
beff
be2 b0 be1
Le = L
L/ 4 L/ 2 L/ 4
beff,0 beff,1
6
13/02/2015
Caractéristiques mécaniques
d’une section mixte
B ; Ib
Gb
b
S = A + B/n c
G
c distance entre les CdG a
a = c.B/n.S Ga
b = c.A/S
I = Ia + Ib/n + c2 A.B/n.S A ; Ia
b h
données
z S
b.h
H
b.h.z
Io 3
b.h Ih 2
b.h.z
I
Io+Ih
∆
12
1 Dalle de béton
Renformis
2
Semelle supérieure
3
Ame
4
Semelle inférieure ∆
5
7
13/02/2015
b h
données
z S
b.h
H
b.h.z
Io 3
b.h Ih 2
b.h.z
I
Io+Ih
∆
12
Renformis
2 b/n
Semelle supérieure
3
Ame
4
Semelle inférieure ∆
5
Total h S H I ∆
I = I∆ – S . v’2 = I∆ – H2 / S
v = h – v’ = h – H / S
v’ = H / S
v
h
v’
∆
Total h S H I ∆
8
13/02/2015
My
σb(y) = y
n In
M G
My
σa(y) =
In
M1 M2 nv M3 ni
M2 y M3 y
σb(y) = 0 + +
nv Inv ni Ini
M1 y M2 y M3 y
σa(y) = + +
Ia Inv Ini
9
13/02/2015
19
20
10
13/02/2015
21
22
11
13/02/2015
23
24
12
13/02/2015
Intensié Déformation
xo xf ELSC N M V+ V- V
charge relative
Tronçon T1 12.8 kN/m 0.000 m 22.500 m 1.00 0.0 MN 1.6 MN.m 0.0 MN 0.0 MN 0.0 MN
Tronçon T2 15.0 kN/m 22.500 m 52.500 m 1.00 0.0 MN 6.8 MN.m 0.0 MN 0.0 MN 0.0 MN
Tronçon T3 12.8 kN/m 52.500 m 75.000 m 1.00 0.0 MN 1.6 MN.m 0.0 MN 0.0 MN 0.0 MN
Cadres courants 1.0 kN/m 0.000 m 75.000 m 1.00 0.0 MN 0.7 MN.m 0.0 MN 0.0 MN 0.0 MN
Charpente 10.7 MN.m 0.0 MN 0.0 MN 0.0 MN
Dalle + Coff. 50.2 kN/m 0.000 m 75.000 m 1.00 0.0 MN 35.3 MN.m 0.0 MN 0.0 MN 0.0 MN
Décoffrage dalle -13.5 kN/m 0.000 m 75.000 m 1.00 0.0 MN -9.5 MN.m 0.0 MN 0.0 MN 0.0 MN
Dalle sans phasage 25.8 MN.m 0.0 MN 0.0 MN 0.0 MN
Superstruct. 27.0 kN/m 0.000 m 75.000 m 1.00 0.0 MN 19.0 MN.m 0.0 MN 0.0 MN 0.0 MN
UDL + Trott 24.9 kN/m 0.000 m 75.000 m 1.00 0.0 MN 17.5 MN.m 0.2 MN -0.2 MN 0.2 MN
TS 296.3 kN 1.00 0.0 MN 10.9 MN.m 0.3 MN -0.3 MN 0.3 MN
Température -1.00E-04 0.60 5.0 MN 4.4 MN.m
Superstruct. 106 j 103 j 1.10 0.381 1.000 14.18 1.000 m 0.2951 m² -1.902 m 0.5897 m4
13
13/02/2015
Béton sup. A.P. sup. A.P. inf. Béton inf. Acier sup. Semelle sup. Ame sup. Ame inf. Semelle inf. Acier inf.
3.308 m 3.268 m 3.089 m 3.000 m 3.000 m 2.973 m 2.945 m 0.085 m 0.043 m 0.000 m
Tronçon T1 0.0 0.0 0.0 0.0 8.7 8.6 8.5 -5.5 -5.7 -5.9
Tronçon T2 0.0 0.0 0.0 0.0 36.4 35.8 35.3 -23.0 -23.9 -24.8
Tronçon T3 0.0 0.0 0.0 0.0 8.7 8.6 8.5 -5.5 -5.7 -5.9
Cadres courants 0.0 0.0 0.0 0.0 3.8 3.7 3.6 -2.4 -2.5 -2.6
Charpente 0.0 0.0 0.0 0.0 57.6 56.7 55.8 -36.5 -37.8 -39.2
Dalle + Coff. 0.0 0.0 0.0 0.0 190.2 187.3 184.4 -120.3 -124.9 -129.4
Décoffrage dalle -1.3 -27.5 -24.3 -1.1 -22.7 -22.2 -21.7 29.7 30.5 31.2
Dalle sans phasage -1.3 -27.5 -24.3 -1.1 167.5 165.1 162.7 -90.6 -94.4 -98.1
Retrait -1.2 28.6 26.6 -1.4 28.9 28.6 28.3 -2.6 -3.1 -3.5
Superstruct. 3.2 44.0 38.2 2.5 35.3 34.4 33.6 -58.5 -59.8 -61.2
A vide sans phasage 1.8 45.0 40.6 1.4 289.4 284.9 280.4 -188.1 -195.1 -202.1
UDL + Trott 3.9 22.9 18.7 2.7 16.6 15.9 15.3 -52.4 -53.4 -54.4
TS 2.4 14.3 11.7 1.7 10.3 9.9 9.5 -32.7 -33.4 -34.0
Température -0.6 14.0 12.9 -0.8 15.8 15.6 15.5 -1.4 -1.7 -1.9
En charge sans phasage 8.1 96.2 83.8 5.8 332.0 326.3 320.6 -274.7 -283.6 -292.4
Contraintes limites 21.0 MPa 434.8 MPa 434.8 MPa 21.0 MPa 335.0 MPa 335.0 MPa 355.0 MPa 355.0 MPa 315.0 MPa 315.0 MPa
0.39 0.22 0.19 0.28 0.97 0.90 0.77 0.90
27
Intensié Déformation
xo xf ELSC N M V+ V- V
charge relative
Plot 1 50.2 kN/m 32.000 m 43.000 m 1.00 0.0 MN 9.6 MN.m 0.0 MN 0.0 MN 0.0 MN
Décoffrage Plot 1 -13.5 kN/m 32.000 m 43.000 m 1.00 0.0 MN -2.6 MN.m 0.0 MN 0.0 MN 0.0 MN
Plot 2 50.2 kN/m 43.000 m 54.000 m 1.00 0.0 MN 7.3 MN.m 0.2 MN 0.2 MN 0.2 MN
Décoffrage Plot 2 -13.5 kN/m 43.000 m 54.000 m 1.00 0.0 MN -2.0 MN.m -0.1 MN -0.1 MN -0.1 MN
Plot 3 50.2 kN/m 21.000 m 32.000 m 1.00 0.0 MN 7.3 MN.m -0.2 MN -0.2 MN -0.2 MN
Décoffrage Plot 3 -13.5 kN/m 21.000 m 32.000 m 1.00 0.0 MN -2.0 MN.m 0.1 MN 0.1 MN 0.1 MN
Plot 4 50.2 kN/m 10.000 m 21.000 m 1.00 0.0 MN 4.3 MN.m -0.1 MN -0.1 MN -0.1 MN
Décoffrage Plot 4 -13.5 kN/m 10.000 m 21.000 m 1.00 0.0 MN -1.2 MN.m 0.0 MN 0.0 MN 0.0 MN
Plot 5 50.2 kN/m 54.000 m 65.000 m 1.00 0.0 MN 4.3 MN.m 0.1 MN 0.1 MN 0.1 MN
Décoffrage Plot 5 -13.5 kN/m 54.000 m 65.000 m 1.00 0.0 MN -1.2 MN.m 0.0 MN 0.0 MN 0.0 MN
Plot 6 50.2 kN/m 65.000 m 75.000 m 1.00 0.0 MN 1.3 MN.m 0.0 MN 0.0 MN 0.0 MN
Décoffrage Plot 6 -13.5 kN/m 65.000 m 75.000 m 1.00 0.0 MN -0.3 MN.m 0.0 MN 0.0 MN 0.0 MN
Plot 7 50.2 kN/m 0.000 m 10.000 m 1.00 0.0 MN 1.3 MN.m 0.0 MN 0.0 MN 0.0 MN
Décoffrage Plot 7 -13.5 kN/m 0.000 m 10.000 m 1.00 0.0 MN -0.3 MN.m 0.0 MN 0.0 MN 0.0 MN
Dalle avec phasage 25.8 MN.m 0.0 MN 0.0 MN 0.0 MN
Superstruct. 27.0 kN/m 0.000 m 75.000 m 1.00 0.0 MN 19.0 MN.m 0.0 MN 0.0 MN 0.0 MN
UDL + Trott 24.9 kN/m 0.000 m 75.000 m 1.00 0.0 MN 17.5 MN.m 0.2 MN -0.2 MN 0.2 MN
TS 296.3 kN 1.00 0.0 MN 10.9 MN.m 0.3 MN -0.3 MN 0.3 MN
Température -1.00E-04 0.60 5.0 MN 4.4 MN.m
14
13/02/2015
Charpente
Superstruct. 106 j 103 j 1.10 0.381 1.000 14.18 1.000 m 0.2951 m² -1.902 m 0.5897 m4
Béton sup. A.P. sup. A.P. inf. Béton inf. Acier sup. Semelle sup. Ame sup. Ame inf. Semelle inf. Acier inf.
3.308 m 3.268 m 3.089 m 3.000 m 3.000 m 2.973 m 2.945 m 0.085 m 0.043 m 0.000 m
Charpente 0.0 0.0 0.0 0.0 57.6 56.7 55.8 -36.5 -37.8 -39.2
Plot 1 0.0 0.0 0.0 0.0 51.7 50.9 50.1 -32.7 -33.9 -35.2
Décoffrage Plot 1 -0.4 -7.5 -6.6 -0.3 -6.2 -6.0 -5.9 8.1 8.3 8.5
Plot 2 1.1 20.4 18.0 0.9 16.8 16.4 16.0 -22.9 -23.4 -24.0
Décoffrage Plot 2 -0.3 -5.3 -4.7 -0.2 -4.3 -4.2 -4.2 6.1 6.3 6.4
Plot 3 1.1 19.4 17.1 0.9 15.9 15.5 15.2 -22.8 -23.3 -23.9
Décoffrage Plot 3 -0.3 -5.1 -4.5 -0.2 -4.2 -4.1 -4.0 6.1 6.3 6.4
Plot 4 0.7 11.1 9.7 0.5 9.0 8.8 8.6 -13.3 -13.6 -13.9
Décoffrage Plot 4 -0.2 -2.9 -2.6 -0.1 -2.4 -2.3 -2.3 3.6 3.7 3.7
Plot 5 0.7 10.8 9.5 0.5 8.8 8.6 8.4 -13.3 -13.6 -13.9
Décoffrage Plot 5 -0.2 -2.9 -2.5 -0.1 -2.3 -2.3 -2.2 3.6 3.7 3.7
Plot 6 0.2 3.1 2.7 0.2 2.5 2.5 2.4 -3.9 -4.0 -4.1
Décoffrage Plot 6 -0.1 -0.8 -0.7 0.0 -0.7 -0.7 -0.6 1.0 1.1 1.1
Plot 7 0.2 3.1 2.7 0.2 2.5 2.4 2.4 -3.9 -4.0 -4.1
Décoffrage Plot 7 -0.1 -0.8 -0.7 0.0 -0.7 -0.7 -0.6 1.0 1.1 1.1
Dalle avec phasage 2.5 42.6 37.3 2.0 86.4 84.8 83.2 -83.1 -85.6 -88.1
Retrait -1.2 28.6 26.6 -1.4 28.9 28.6 28.3 -2.6 -3.1 -3.5
Superstruct. 3.2 44.0 38.2 2.5 35.3 34.4 33.6 -58.5 -59.8 -61.2
A vide avec phasage 5.7 115.1 102.1 4.5 208.2 204.6 200.9 -180.7 -186.3 -192.0
UDL + Trott 3.9 22.9 18.7 2.7 16.6 15.9 15.3 -52.4 -53.4 -54.4
TS 2.4 14.3 11.7 1.7 10.3 9.9 9.5 -32.7 -33.4 -34.0
Température -0.6 14.0 12.9 -0.8 15.8 15.6 15.5 -1.4 -1.7 -1.9
En charge avec phasage 12.0 166.2 145.4 8.8 250.9 246.0 241.1 -267.2 -274.8 -282.3
Contraintes limites 21.0 MPa 434.8 MPa 434.8 MPa 21.0 MPa 335.0 MPa 335.0 MPa 355.0 MPa 355.0 MPa 315.0 MPa 315.0 MPa
0.57 0.38 0.33 0.42 0.73 0.68 0.75 0.87
15
13/02/2015
Dalle avec phasage 2.6 41.4 36.2 2.0 85.4 83.8 82.2 -83.0 -85.5 -87.9
En charge avec phasage 12.0 165.1 144.3 8.9 249.9 245.0 240.1 -267.1 -274.7 -282.2
-0.4% 0.7% 0.7% -0.4% 0.4% 0.4% 0.4% 0.0% 0.0% 0.0%
Charpente 0.0 0.0 0.0 0.0 57.6 56.7 55.8 -36.5 -37.8 -39.2
Dalle avec phasage 2.5 43.2 38.0 2.0 87.0 85.4 83.8 -83.2 -85.7 -88.2
Retrait -1.1 27.3 25.5 -1.3 27.3 27.1 26.8 -2.5 -2.9 -3.4
Superstruct. 2.9 50.5 44.4 2.3 41.3 40.4 39.4 -59.0 -60.5 -61.9
A vide avec phasage 5.4 121.1 107.8 4.3 213.3 209.6 205.9 -181.1 -186.9 -192.6
UDL + Trott 3.9 22.5 18.2 2.7 16.2 15.5 14.9 -52.4 -53.4 -54.4
TS 2.4 14.0 11.4 1.7 10.1 9.7 9.3 -32.7 -33.3 -34.0
Température -0.6 14.0 12.9 -0.9 15.9 15.7 15.5 -1.4 -1.7 -1.9
En charge avec phasage 11.7 171.5 150.3 8.6 255.4 250.5 245.5 -267.6 -275.3 -282.9
2.4% -3.2% -3.4% 2.4% -1.8% -1.8% -1.8% -0.2% -0.2% -0.2%
Faible
Justification en élasticité
Armatures
passives
fs / 1,15 - fs / 1,15
Acier de
charpente
fy - fy
32
16
13/02/2015
Justification en élasticité
Armatures
passives
fs / 1,15 - fs / 1,15
Acier de
charpente
fy - fy
33
Justification en plasticité
34
17
13/02/2015
Justification en plasticité
35
Justification en plasticité
36
18
13/02/2015
Justification en plasticité
37
Justification en plasticité
38
19
13/02/2015
η f yw
VEd = ∑ Vϕi ≤ V pl ,a , Rd = hw t w
i γ m0 3
γ m1 = 1,1
20
13/02/2015
χ w f yw
Vbw, Rd = hw t w
γ m1 3
2
π 2 E tw f yw
σE = τ cr = kτ σ E λw =
12 (1 −ν ) hw
2
τ cr 3
21
13/02/2015
η1 + 1 −
M f , Rd
( 2
2 η3 − 1 ≤ 1
)
M pl , Rd
M Ed M f , Rd
η1 = ≥
M pl , Rd M pl , Rd
VEd
η3 =
Vbw, Rd
M f , Rd Moment résistant plastique de la section composée
uniquement des semelles efficaces
M pl , Rd Moment résistant plastique de la section composée des
semelles efficaces et de la totalité de l’âme
22
13/02/2015
(1 − ρ ) f yw
2
2V
ρ = Ed − 1
VRd
Géométrie
Dalle 5.400 m 0.264 m C35
Renformis 1.000 m 0.044 m C35
Semelle supérieure 1.000 m 0.055 m S355
Ame 0.015 m 2.860 m S355 Classe section 1
Semelle inférieure 1.100 m 0.085 m S355
Chargement
Etat 1.1 Etat 1.1 Etat 1.1 Etat 1.1 Etat 1.2 Etat 2.1 Etat 3.1 Etat 3.2 Etat 4 Etat 5
Tronçon T1 Tronçon T2 Tronçon T3Cadres courantsDalle + Coff. Superstruct. UDL + Trott TS Retrait Température
Section résistante Acier seul Acier seul Acier seul Acier seul Acier seul Mixte nv Mixte ni Mixte ni Mixte Mixte
Intensié charge 12.8 kN/m 15.0 kN/m 12.8 kN/m 1.0 kN/m 50.2 kN/m 13.5 kN/m 24.9 kN/m 296.3 kN
xo 0.000 m 22.500 m 52.500 m 0.000 m 0.000 m 0.000 m 0.000 m
xf 22.500 m 52.500 m 75.000 m 75.000 m 75.000 m 75.000 m 75.000 m
Déformation relative -2.40E-04 -1.00E-04
Pondération
Pondération ELU 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.00 1.35
Sollicitations
Etat 1.1 Etat 1.1 Etat 1.1 Etat 1.1 Etat 1.2 Etat 2.1 Etat 3.1 Etat 3.2 Etat 4 Etat 5 Total
N (ELU) 0.0 MN 0.0 MN 0.0 MN 0.0 MN 0.0 MN 0.0 MN 0.0 MN 0.0 MN 4.7 MN 5.0 MN 0.0 MN
M (ELU) 3.1 MN.m 6.8 MN.m 1.3 MN.m 0.8 MN.m 40.1 MN.m 10.8 MN.m 19.9 MN.m 12.5 MN.m 6.2 MN.m 4.4 MN.m 95.1 MN.m
Effort tranchant positif V+ -0.1 MN 0.3 MN 0.1 MN 0.0 MN 1.0 MN 0.3 MN 0.6 MN 0.6 MN 2.79 MN
Effort tranchant positif V- -0.1 MN 0.3 MN 0.1 MN 0.0 MN 1.0 MN 0.3 MN -0.1 MN -0.2 MN 1.27 MN
V (ELU) -0.06 MN 0.30 MN 0.06 MN 0.02 MN 1.02 MN 0.27 MN 0.62 MN 0.55 MN 2.79 MN
23
13/02/2015
tw = 15 mm – Raidisseur rigide
hw 2.860 m hw/tw 190.7 α 2.90
tw 0.015 m fy 355 kτ 5.81
Nuance S355 ε 0.814 σE 5.2 MPa
a 8.300 m 72ε/η 48.8 τcr 30.4 MPa
Etude voilement OUI λw 2.60
χw 0.415 Rigide
Ved 2.79 MN Vpl a Rd 10.55 MN VbwRd 3.32 MN 0.84
65 MPa Interaction (M,N) OUI 77 MPa
ρ 0.46
24
13/02/2015
25