EXCAVATION

16 16 4.3 1100.8 1155.84

GRAVEL BEDDING 16 16 0.5 128 134.4

CONCRETING 16 16 0.8 204.8 215.04


fww 16 0.8 4 51.2 53.76
rebars
bot 107.666666667 108 17.6 1900.8 316.8 320 25mm
54.3333333333 55 17.6 968 161.3333 165 20mm

top 81 81 17.6 1425.6 237.6 240 25mm


54.3333333333 55 17.6 968 161.3333 165 20mm

gf walls
CONCRETING 15 6 0.3 3 81 85.05
formworks 15 3 6 2 540 567

walls 101 101 4.5 4 1818 303 318.15


51 51 4.5 4 918 153 160.65

101 101 4.5 2 909 151.5 159.075


101 101 4.5 2 909 151.5 159.075

hor 11 11 16 12 2112 352 369.6

SLAB
CONCRETING 0.2 15 15 45 47.25
0.3 0.4 15 1.8 1.89
0.3 0.4 15 1.8 1.89
0.3 0.4 5.4 0.648 0.6804
51.7104
FORMWORKS
15 15 1 225 236.25
15 0.2 4 12 12.6
0.3 2 15 9 9.45
0.3 2 15 9 9.45
15 0.2 4 12 12.6
280.35

REBARS
top 76 76 16 1216 202.6667 203 25mm
76 76 16 1216 202.6667 203 25mm

bot 86.7142857143 87 16 1392 232 232 25mm


51 51 16 816 136 136 25mm

extra 76 76 2.6 2 395.2 65.86667 66


76 76 1.8 2 273.6 45.6 46
51 51 2.6 3 397.8 66.3 72

beams
top 16 1 4 64 10.66667 11.2 12.00
bot 16 1 4 64 10.66667 11.2 11

beams
top 11 1 4 44 7.333333 7.7 8.00
bot 11 1 4 44 7.333333 7.7 8

top 6.04 2 4 48.32 8.053333 8.456 9


bot 6.04 2 4 48.32 8.053333 8.456 9

14.1
95 105 1.9 1 105 35 35
9.1
61.6666666667 72 1.9 1 72 24 24
4.14
28.6 39 1.9 2 78 26 26

WALLS 15 6 0.2 2 36 37.8


CONCRETE 9.8 6 0.2 1 11.76 12.348
5.4 6 0.2 2 12.96 13.608
13 6 0.2 4 62.4 65.52
129.276

FORMWORKS 15 6 2 2 360 378


9.8 6 2 1 117.6 123.48
5.4 6 2 2 129.6 136.08
13 6 2 4 624 655.2
1292.76

15 121 121 7 2 2 3388


6 21 21 17 2 2 1428

10 81 81 7.5 2 1 1215
6 21 21 12 2 1 504

5.04 41.32 42 7.5 2 2 1260


6 21 21 7.04 2 2 591.36
13 105 105 7.5 2 4 6300
6 21 21 15 2 4 2520

PUMP AREA 3.14 10.06 0.1 1 3.15884 3.316782


2 1.63 0.1 1 0.326 0.3423
BEAM 2 0.2 0.4 2 0.32 0.336
1.63 0.15 0.4 1 0.0978 0.10269
10.06 0.3 0.4 2 2.4144 2.53512
3.14 0.3 0.4 3 1.1304 1.18692
7.819812

FORMWORKS 3.14 10.06 1 31.5884 33.16782


3.14 0.5 2 3.14 3.297
10.06 0.5 2 10.06 10.563
1.63 2 1 3.26 3.423
1.63 0.5 2 1.63 1.7115
2 0.5 2 2 2.1
54.26232

REBARS
SLAB 10.6 71.66667 22 4.14 91.08 15.18 15.939
3.14 11.46667 12 11.6 139.2 23.2 24.36

BEAMS 10.6
2B1 11.6 2 2 46.4 7.733333 8.12 8
11.6 2 2 46.4 7.733333 8.12 8
54 54 1.7 2 183.6 30.6 32.00

2EB1 1.63
2.63 2 1 5.26 0.876667 0.9205 1
2.63 2 1 5.26 0.876667 0.9205 1
9.15 10 1.4 1 14 2.333333 3.00

2B1 3.14
4.14 2 3 24.84 4.14 4.347 5
4.14 2 3 24.84 4.14 4.347 5
16.7 11 1.7 3 56.1 9.35 10.00

2CB1 2
3 4 1 12 2 2.1 2
3 2 1 6 1 1.05 1
11 11 1.5 1 16.5 2.75 3.00

2CB1 2
3 5 1 15 2.5 2.625 3
3 2 1 6 1 1.05 1
11 11 1.9 1 20.9 3.483333 4.00

catwalk 9.83 1 0.1 0.983 1.03215


8.6 1 0.1 0.86 0.903
1.93515

9.83 1 1 9.83 10.3215


9.83 0.1 2 1.966 2.0643
8.6 1 1 8.6 9.03
8.6 0.1 2 1.72 1.806
23.2218
rebars
9.83 32.76667 33 1 33 5.775 6
9.83 32.76667 33 1.6 52.8 9.24 10
0
8.6 28.66667 29 1 29 5.075 5
8.3 27.66667 28 1.6 44.8 7.84 8

9.83 6 58.98 1 58.98 10.3215 11


8.6 6 51.6 1 51.6 9.03 10

roof beams
3.15 2 0.4 0.2 0.504 0.5292
5.14 2 0.4 0.2 0.8224 0.86352
1.39272

formworks 0.4 2 3.15 2 5.04 5.292


0.2 1 3.15 2 1.26 1.323
0.4 2 5.14 2 8.224 8.6352
0.2 1 5.14 2 2.056 2.1588
17.409

rebars 3.15
4.15 2 2 16.6 2.766667 2.905 3
4.15 2 2 16.6 2.766667 2.905 3
16.75 18 1.3 2 46.8 7.8 8.00

5.14
6.14 2 2 24.56 4.093333 4.298 5
6.14 2 2 24.56 4.093333 4.298 4
26.7 30 1.3 2 78 13 13.00
planted columns
3 4 0.4 0.2 0.96 1.008
1.008

formworks 0.4 2 3 4 9.6 10.08


0.2 2 3 4 4.8 5.04
15.12

rebars 3
4 2 4 32 5.333333 5.6 6
4 2 4 32 5.333333 5.6 6
16 18 1.3 2 46.8 7.8 8.00
23.10 7,392.00
14.82 2,445.30

23.10 5,544.00 3.85


14.82 2,445.30
17,826.60
231.75 18,058.35
4.5

318 20mm 14.82 4,712.76


160.00 20mm 14.82 2,371.20

160 20mm 14.82 2,371.20 2.47


160.00 20mm 14.82 2,371.20

370 12mm 5.33 1,971.36 0.888


13,797.72
179.37 13,977.09

23.10 4,689.30 3.85


23.10 4,689.30

23.10 5,359.20
23.10 3,141.60

25mm 23.10 1,524.60


25mm 23.10 1,062.60
25mm 23.10 1,663.20
23,761.00
308.89 24,069.89

25mm 23.10 277.20


25mm 23.10 254.10

1.43
25mm 23.10 184.80
25mm 23.10 184.80

25mm 23.10 207.90


25mm 23.10 207.90

10mm 3.70 129.5

10mm 3.70 88.8


0
3.70 96.2
1,631.20

592.90 593.00 20mm 14.82 8,788.26 2.47


249.90 250.00 12MM 5.33 1,332.00

212.63 213.00 20mm 14.82 3,156.66


88.20 89.00 12MM 5.33 474.19

220.50 221.00 20mm 14.82 3,275.22 2.47


103.49 104.00 12MM 5.33 554.11
1,102.50 1,103.00 20mm 14.82 16,346.46
441.00 442.00 12MM 5.33 2,354.98
36,281.88
471.66
36,753.54

16.00
25.00
41.00 82.00 12MM 5.33 436.90

20mm 14.82 118.56


20mm 14.82 118.56
10MM 3.70 118.40

16mm 9.48 9.48


16mm 9.48 9.48
10MM 3.70 11.10

16mm 9.48 47.40


16mm 9.48 47.40
10MM 3.70 37.00

25mm 23.10 46.20


25mm 23.10 23.10
10MM 3.70 11.10

25mm 23.10 69.30


25mm 23.10 23.10
10MM 3.70 14.80
704.98
436.90
1,141.88
14.84
1,156.72

12MM 5.33 31.97


12MM 5.33 53.28
12MM 5.33 -
12MM 5.33 26.64
12MM 5.33 42.62
-
10MM 3.70 40.70
10MM 3.70 37.00
232.21
3.02
235.23

16mm 9.48 28.44


16mm 9.48 28.44
10MM 3.70 29.60

16mm 9.48 47.40


16mm 9.48 37.92
10MM 3.70 48.10
219.90
2.86
222.76

16mm 9.48 56.88


16mm 9.48 56.88
10MM 3.70 29.60
143.36
1.86
145.22
15

- -
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Date : JANUARY 011, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00
Formworks 53.76 sm 250.00 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60
Formworks 1,293.00 sm 250.00 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,736.93
Formworks 54.00 sm 250.00 13,500.00
Rebars 1,150.00 kgs 4.50 5,175.00

6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00

7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50

9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00

10 trimming 570.00 sqm 200.00 114,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,450,000.00

EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT

PREPARE BY:

Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REABRWORKS AND TRIMMING)
Date : JANUARY 011, 2022

DESCRIPTION QTY UNT UNIT COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00

Formworks 53.76 sm 250.00


64.00 M

Rebars 18,050.00 kgs 4.50

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00

Formworks 567.00 sm 250.00

Rebars 13,977.09 kgs 4.50

3 GF SLAB
Concrete 51.71 cum 350.00

Formworks 280.35 sm 250.00

Rebars 24,069.89 kgs 4.50


4 2ND FLOOR WALL (6M)
Concrete 129.28 cum 350.00

Formworks 1,292.76 sm 250.00

Rebars 36,753.54 kgs 4.50

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00

Formworks 54.26 sm 250.00

Rebars 1,156.72 kgs 4.50

6 CATWALK
Concrete 1.94 cum 350.00

Formworks 23.22 sm 250.00


Rebars 235.23 kgs 4.50

7 ROOF BEAMS
Concrete 1.39 cum 350.00

Formworks 17.41 sm 250.00

Rebars 222.76 kgs 4.50

8 PLANTED COLUMNS
Concrete 1.01 cum 350.00

Formworks 15.12 sm 250.00

Rebars 145.22 kgs 4.50

9 PUMP room
CHB 4'' wall 45.00 sqm 180.00
Plastering on CHB wall 90.00 sqm 150.00

roof framing 17.27 sqm 250.00

roofing 17.27 sqm 300.00

10 trimming 531.20 sqm 200.00

11 GRAVEL BED 128.00 CUM 180.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00
railings 53.76 lm 550.00

13 exterior plastering
ground level tank 336 sqm 150.00

Total amount Php

SUPERVISION ON EXCAVATION 1 month 30,000.00

EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT
3. GRAVEL BEDDING

PREPARE BY:

Pheby Moog
TOTAL COST
MD MP
75,264.00 43.01 6.00 DAYS 700.00 15.00 63,000.00 #REF!
44.00 PER DAY
5.50

13,440.00 100.53 2.00 DAYS 700.00 15.00 21,000.00 #REF!


12.57
0.84

81,225.00 17.77 2.00 DAYS 700.00 20.00 28,000.00 #REF!


307.88
38.49
1.92

29,767.50 17.01 3.00 DAYS 700.00 15.00 31,500.00 #REF!


18.00 PER DAY
2.25

141,750.00 1,060.29 10.00 DAYS 700.00 20.00 140,000.00 #REF!


132.54
6.63

62,896.91 13.76 2.00 DAYS 700.00 20.00 28,000.00 #REF!


238.41
29.80
1.49

18,098.64 10.34 2.00 DAYS 700.00 15.00 21,000.00 #REF!


11.00 PER DAY
1.38

70,087.50 372.87 4.00 DAYS 700.00 20.00 56,000.00 #REF!


46.61
2.33

108,314.52 23.69 4.00 DAYS 700.00 20.00 56,000.00 #REF!


410.56
51.32
2.57

45,246.60 25.86 4.00 DAYS 700.00 15.00 42,000.00 #REF!


26.00 PER DAY
3.25

323,190.00 1,719.37 12.00 DAYS 700.00 20.00 168,000.00 #REF!


214.92
10.75

165,390.95 36.17 5.00 DAYS 700.00 20.00 70,000.00 #REF!


626.91
78.36
3.92

2,736.93 1.56 1.00 DAYS 700.00 10.00 7,000.00 #REF!


2.00 PER DAY
0.25

13,565.58 72.17 2.00 DAYS 700.00 10.00 14,000.00 #REF!


9.02
0.45

5,205.24 1.14 2.00 DAYS 700.00 10.00 14,000.00 #REF!


19.73
2.47
0.12

677.30 0.39 1.00 DAYS 700.00 10.00 7,000.00 #REF!


1.00 PER DAY
0.13

5,805.45 30.88 2.00 DAYS 700.00 10.00 14,000.00 #REF!


3.86
0.39
1,058.54 0.23 0.50 DAYS 700.00 10.00 3,500.00 #REF!
4.01
0.50
0.05

487.45 0.28 1.00 DAYS 700.00 5.00 3,500.00 #REF!


1.00 PER DAY
0.13

4,352.25 23.15 0.50 DAYS 700.00 5.00 1,750.00 #REF!


2.89
0.29

1,002.41 0.22 0.50 DAYS 700.00 5.00 1,750.00 #REF!


3.80
0.47
0.05

352.80 0.20 1.00 DAYS 700.00 5.00 3,500.00 #REF!


1.00 PER DAY
0.13

3,780.00 20.11 0.50 DAYS 700.00 5.00 1,750.00 #REF!


2.51
0.25

653.51 0.14 0.50 DAYS 700.00 5.00 1,750.00 #REF!


2.48
0.31
0.03

8,100.00 9.00 2.00 days 1,100.00 2.00 4,400.00 #REF!


1.13
13,500.00 18.00 3.00 days 1,100.00 2.00 6,600.00 #REF!
2.25

4,317.50 1.00 days 1,200.00 1.00 1,200.00 #REF!

5,181.00 1.00 days 1,200.00 1.00 1,200.00 #REF!

106,240.00 66.40 14.00 days 600.00 10.00 84,000.00 #REF!


6.64
23,040.00 16.00 2.00 days 600.00 10.00 12,000.00 #REF!
1.60

15,000.00
29,568.00

50,400.00 67.20 3.00 days 1,100.00 5.00 16,500.00 #REF!


1.68

1,429,695.58 94.50 #REF!

72.00
50.00 +
567.00 196.875
64.00 0 280.35 97.34375

1,292.76 448.875
54.26 18.84108
23.22 8.063125

1.00 1,500.00 60.00 90,000.00


1.00 900.00 60.00 54,000.00
10.00 600.00 60.00 360,000.00 13278.24
10.00 600.00 60.00 360,000.00
15.00 500.00 60.00 450,000.00
37.00 1,314,000.00

phenolic board 3/4


aluma 5mts

22866.4
34915.87
alejo 6 20
pintor 6 20
149.625 246.9688 2.5

300 shts 4.166667 12


2.5 26 78

26 38

114
2.5 8.5 750 6375
2.5 8.5 600 5100
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 1
Date : FEBRUARY 3, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion fabrication
Concrete 215.04 cum 350.00 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 40% 5,376.00
Rebars 18,050.00 kgs 4.50 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 87.00 40% 8,700.00
Rebars 13,977.00 kgs 4.50 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60
Formworks 1,293.00 sm 250.00 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,736.93
Formworks 54.00 sm 250.00 13,500.00
Rebars 1,150.00 kgs 4.50 5,175.00

6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50

9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00

10 trimming 570.00 sqm 200.00 114,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,450,000.00

bill 1 14,076.00
EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT
PREPARE BY:

Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 2
Date : FEBRUARY 10, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion fabrication
Concrete 215.04 cum 350.00 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 40% 5,376.00
Rebars 18,050.00 kgs 4.50 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 210.00 40% 21,000.00
Rebars 13,977.00 kgs 4.50 62,896.50

Total amount Php 1,450,000.00


TOTAL 26,376.00
LESS bill 1 16,000.00
PREPARE BY: bill 2 10,376.00

Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 3
Date : FEBRUARY 17, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion fabrication
Concrete 215.04 cum 350.00 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 40% 5,376.00
Rebars 18,050.00 kgs 4.50 81,225.00 7500 25% 8,437.50

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 250.00 40% 25,000.00
Rebars 13,977.00 kgs 4.50 62,896.50

Total amount Php 1,450,000.00


TOTAL 38,813.50
LESS bill 1 16,000.00
PREPARE BY: BILL 2 10,000.00
bill 3 12,813.50
Pheby Moog
NOTE; SIR BAKA PEDE CA 10k PAMBALE NUNG MGA
BAGONG TAO NEXT WEEK

note ca 5k
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 4
Date : FEBRUARY 24, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion fabrication
Concrete 215.04 cum 350.00 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 30% 4,032.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 25% 20,306.25

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 300.00 30% 22,500.00
Rebars 13,977.00 kgs 4.50 62,896.50 6,085.62 25% 6,846.32

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60
Formworks 1,293.00 sm 250.00 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,736.93
Formworks 54.00 sm 250.00 13,500.00
Rebars 1,150.00 kgs 4.50 5,175.00

6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00

7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50

9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00

10 trimming 570.00 sqm 200.00 114,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,450,000.00


TOTAL 53,684.57
LESS bill 1 16,000.00
EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT

PREPARE BY: BILL 2 10,000.00


bill 3 12,813.50
Pheby Moog bill 4 14,871.07

ca 5k
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 5
Date : MARCH 3, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion fabrication
Concrete 215.04 cum 350.00 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 30% 4,032.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 25% 20,306.25

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 350.00 30% 26,250.00
Rebars 13,977.00 kgs 4.50 62,896.50 12,842.64 25% 14,447.96

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 50 75% 6,750.00

Total amount Php 1,354,953.98


TOTAL 71,786.21
LESS bill 1 16,000.00
EXCLUSIONS: BILL 2 10,000.00
1. WATER PROOFING AND PAINTING bill 3 12,813.50
2. PIPING AND EQUIPMENT bill 4 14,871.07
bill 4 18,101.65
PREPARE BY:

Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 6
Date : MARCH 10, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion fabrication
Concrete 215.04 cum 350.00 75,264.00 -
Formworks 53.76 sm 250.00 13,440.00 53.76 50% 6,720.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 60% 48,735.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 350.00 30% 26,250.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 30% 18,868.95

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 60% 30,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 70% 25,200.00

Total amount Php 1,386,000.00 TOTAL 155,773.95


Pheby Moog bill 1 16,000.00
LESS BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL5 18,101.65
bill 6 83,987.74

activity trimming on culvert sides


rate man power days
labor workers 500 4 3 6000
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 7
Date : MARCH 17, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 0% -
Formworks 53.76 sm 250.00 13,440.00 53.76 60% 8,064.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 8,980.73 100% 40,413.26
fabricated 9,069.28 50% 20,405.87
2 UNDER GROUND WALLS (3m)
Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 fabricated 350.00 30% 26,250.00
Rebars 13,977.00 kgs 4.50 62,896.50 installed 2,927.34 100% 13,173.03
fabricated 11,049.66 50% 24,861.74

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 60% 30,000.00 no movement

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 70% 25,200.00 no movement

Total amount Php 1,386,000.00 TOTAL 188,367.90


Pheby Moog bill 1 16,000.00
LESS BILL 2 10,000.00
bill 3 12,813.50
additional cost bill 4 14,871.07
removal of installed rebars 11,908.07 kgs 2.25 26,793.15 BILL5 18,101.65
removal of dead forms bill 6 83,982.00
bill 7 32,599.68
dismatling of all installed rebars additional 26,793.15
59,392.83
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 8
Date : MARCH 24, 2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 0% -
Formworks 53.76 sm 250.00 13,440.00 53.76 60% 8,064.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 8,980.73 100% 40,413.26
fabricated 9,069.28 50% 20,405.87
2 UNDER GROUND WALLS (3m)
Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 fabricated 350.00 30% 26,250.00
Rebars 13,977.00 kgs 4.50 62,896.50 installed 2,927.34 100% 13,173.03
fabricated 11,049.66 50% 24,861.74

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 80% 40,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 70% 25,200.00

Total amount Php 1,386,000.00 TOTAL 198,367.90


Pheby Moog bill 1 16,000.00
LESS BILL 2 10,000.00
bill 3 12,813.50
additional cost bill 4 14,871.07
re installation of rebars 7,170.16 kgs 2.25 16,132.85 BILL5 18,101.65
re installation of forms 13.50 sqm 150.00 2,025.00 bill 6 83,982.00
bill 7 32,599.68
bill 8 10,000.00
re-installation of rebars and formworks additional 18,157.85
28,157.85
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 9
Date : MARCH 31,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 61.00 100% 21,350.00
Formworks 53.76 sm 250.00 13,440.00 53.76 60% 8,064.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 8,980.73 100% 40,413.26
fabricated 9,069.28 50% 20,405.87
2 UNDER GROUND WALLS (3m)
Concrete 85.05 cum 350.00 29,767.50
Formworks 567.00 sm 250.00 141,750.00 fabricated 350.00 30% 26,250.00
Rebars 13,977.00 kgs 4.50 62,896.50 installed 4,111.49 100% 18,501.71
fabricated 9,865.51 50% 22,197.40

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 85% 42,500.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 70% 25,200.00

Total amount Php 1,386,000.00 TOTAL 224,882.23


Pheby Moog bill 1 16,000.00
LESS BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL5 18,101.65
bill 6 83,982.00
bill 7 32,599.68
bill 8 10,000.00
bill 9 26,514.34
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 10
Date : april 7,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 61.00 100% 21,350.00
Formworks 53.76 sm 250.00 13,440.00 53.76 60% 8,064.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 8,980.73 100% 40,413.26
fabricated 9,069.28 50% 20,405.87
2 UNDER GROUND WALLS (3m)
Concrete 85.05 cum 350.00 29,767.50 23.5 100% 8,225.00
Formworks 567.00 sm 250.00 141,750.00 installed 160.00 100% 40,000.00
fabricated 180.00 30% 13,500.00
Rebars 13,977.00 kgs 4.50 62,896.50 installed 4,111.49 100% 18,501.71
fabricated 9,865.51 50% 22,197.40

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 90% 45,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 85% 30,600.00

Total amount Php 1,386,000.00 TOTAL 268,257.23


Pheby Moog bill 1 16,000.00
LESS BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL5 18,101.65
bill 6 83,982.00
bill 7 32,599.68
bill 8 10,000.00
bill 9 26,514.34
bill 10 43,375.00
plus 7,000.00
giselle plan and vitas new plan(arch mech elec)
50,375.00
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 10 assumed accomplishement
Date : april 9,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 18,050.00 100% 81,225.00
2 UNDER GROUND WALLS (3m)
Concrete 85.05 cum 350.00 29,767.50 23.5 100% 8,225.00
Formworks 567.00 sm 250.00 141,750.00 installed 160.00 100% 40,000.00
fabricated 180.00 30% 13,500.00
Rebars 13,977.00 kgs 4.50 62,896.50 installed 10,482.00 100% 47,169.00

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00 59 80% 11,800.00
Rebars 24,060.00 kgs 4.50 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60
Formworks 1,293.00 sm 250.00 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,736.93
Formworks 54.00 sm 250.00 13,500.00
Rebars 1,150.00 kgs 4.50 5,175.00

6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00

7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50

9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00

11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,386,000.00 TOTAL 376,623.00


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL5 18,101.65
bill 6 83,982.00
bill 7 32,599.68
bill 8 10,000.00
bill 9 26,514.34
bill 10 43,375.00
bill 11 108,365.77
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 11 actual accomplishement
Date : april 14,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 123.00 100% 43,050.00
Formworks 53.76 sm 250.00 13,440.00 53.76 80% 10,752.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 12,337.91 100% 55,520.60
5,712.09 50% 12,852.20

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 23.5 100% 8,225.00
Formworks 567.00 sm 250.00 141,750.00 installed 210.00 100% 52,500.00
fabricated 180.00 30% 13,500.00
Rebars 13,977.00 kgs 4.50 62,896.50 installed 7,642.21 100% 34,389.93
fabricated 6,334.79 50% 14,253.29
3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 -
Formworks 280.00 sm 250.00 70,000.00 60.75 75% 11,390.63
Rebars 24,060.00 kgs 4.50 108,270.00 - -

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60
Formworks 1,293.00 sm 250.00 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00 -
-
5 PUMP AND FILTER AREA -
Concrete 7.82 cum 350.00 2,736.93 -
Formworks 54.00 sm 250.00 13,500.00 -
Rebars 1,150.00 kgs 4.50 5,175.00 -
-
6 CATWALK -
Concrete 1.94 cum 350.00 677.30 -
Formworks 23.00 sm 250.00 5,750.00 -
Rebars 250.00 kgs 4.50 1,125.00 -
-
7 ROOF BEAMS -
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -
-
8 PLANTED COLUMNS -
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -
-
10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 90% 45,000.00
-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 85% 30,600.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,386,000.00 TOTAL 332,033.64


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL5 18,101.65
bill 6 83,982.00
bill 7 32,599.68
bill 8 10,000.00
bill 9 26,514.34
bill 10 43,375.00
bill 11 63,776.40
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 12 actual accomplishement
Date : april 22,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 123.00 100% 43,050.00
Formworks 53.76 sm 250.00 13,440.00 53.76 80% 10,752.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 12,337.91 100% 55,520.60
5,712.09 50% 12,852.20

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 46.5 100% 16,275.00
Formworks 567.00 sm 250.00 141,750.00 installed 360.00 100% 90,000.00
73.00 50% 9,125.00

Rebars 13,977.00 kgs 4.50 62,896.50 installed 9,360.00 100% 42,120.00


3,160.00 50% 7,110.00

3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 -
Formworks 280.00 sm 250.00 70,000.00 67.50 100% 16,875.00
Rebars 24,060.00 kgs 4.50 108,270.00 6,368.82 100% 28,659.71

-
10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 90% 45,000.00
-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 85% 30,600.00

Total amount Php 1,386,000.00 TOTAL 407,939.50


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 13 actual accomplishement
Date : april 23,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 123.00 100% 43,050.00
Formworks 53.76 sm 250.00 13,440.00 53.76 80% 10,752.00
Rebars 18,050.00 kgs 4.50 81,225.00 installed 12,337.91 100% 55,520.60
5,712.09 50% 12,852.20

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 46.5 100% 16,275.00
Formworks 567.00 sm 250.00 141,750.00 installed 360.00 100% 90,000.00
73.00 50% 9,125.00

Rebars 13,977.00 kgs 4.50 62,896.50 installed 9,360.00 100% 42,120.00


3,160.00 50% 7,110.00

3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 45 100% 15,750.00
Formworks 280.00 sm 250.00 70,000.00 136.00 80% 27,200.00
Rebars 24,060.00 kgs 4.50 108,270.00 13,374.00 100% 60,183.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 -
Formworks 1,293.00 sm 250.00 323,250.00 -
Rebars 36,750.00 kgs 4.50 165,375.00 20,525.00 100% 92,362.50
-
-
10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00
-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,386,000.00 TOTAL 568,300.30


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 12 160,360.79
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 14
Date : may 5,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 46.5 100% 16,275.00
Formworks 567.00 sm 250.00 141,750.00 installed 460.00 100% 115,000.00
43.00 50% 5,375.00

Rebars 13,977.00 kgs 4.50 62,896.50 installed 13,450.00 100% 60,525.00

3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 45 100% 15,750.00
Formworks 280.00 sm 250.00 70,000.00 136.00 80% 27,200.00
Rebars 24,060.00 kgs 4.50 108,270.00 13,374.00 100% 60,183.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 -
Formworks 1,293.00 sm 250.00 323,250.00 25.00 80% 5,000.00
Rebars 36,750.00 kgs 4.50 165,375.00 20,525.00 100% 92,362.50
-
-
10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00
-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00

Total amount Php 1,386,000.00 TOTAL 653,599.50


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 15
Date : may 12,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 69.5 100% 24,325.00
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 45 100% 15,750.00
Formworks 280.00 sm 250.00 70,000.00 136.00 80% 27,200.00
Rebars 24,060.00 kgs 4.50 108,270.00 installed 13,374.00 100% 60,183.00
fabricated 10,686.00 50% 24,043.50

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60
Formworks 1,293.00 sm 250.00 323,250.00 122.40 80% 24,480.00
Rebars 36,750.00 kgs 4.50 165,375.00 24,135.80 100% 108,611.10

Total amount Php 1,386,000.00 TOTAL 745,168.10


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 16
Date : may 19,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 85.05 100% 29,767.50
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 136.00 100% 34,000.00
144.00 80% 28,800.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 47.00 350.00 -
Formworks 1,293.00 sm 250.00 323,250.00 273.00 75% 51,187.50
Rebars 36,750.00 kgs 4.50 165,375.00 29,512.00 100% 132,804.00

Total amount Php 1,386,000.00 TOTAL 863,503.14


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,335.04
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 17
Date : may 26,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 85.05 100% 29,767.50
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 47.00 350.00 16,450.00
Formworks 1,293.00 sm 250.00 323,250.00 475.00 100% 118,750.00
Rebars 36,750.00 kgs 4.50 165,375.00 31,924.00 100% 143,658.00

Total amount Php 1,386,000.00 TOTAL 965,569.64


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 18
Date : jun 2,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 85.05 100% 29,767.50
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 98.00 350.00 34,300.00
Formworks 1,293.00 sm 250.00 323,250.00 905.00 100% 226,250.00
Rebars 36,750.00 kgs 4.50 165,375.00 30,937.00 100% 139,216.50

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,736.93 -
Formworks 54.00 sm 250.00 13,500.00 -
Rebars 1,150.00 kgs 4.50 5,175.00 -

6 CATWALK
Concrete 1.94 cum 350.00 677.30 -
Formworks 23.00 sm 250.00 5,750.00 -
Rebars 250.00 kgs 4.50 1,125.00 -

7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00


-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,386,000.00 TOTAL 1,086,478.14


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,908.50
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 19
Date : jun 9,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 85.05 100% 29,767.50
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 98.00 100% 34,300.00
Formworks 1,293.00 sm 250.00 323,250.00 905.00 100% 226,250.00
388.00 75% 72,750.00
Rebars 36,750.00 kgs 4.50 165,375.00 36,750.00 100% 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,736.93 -
Formworks 54.00 sm 250.00 13,500.00 -
Rebars 1,150.00 kgs 4.50 5,175.00 -

6 CATWALK
Concrete 1.94 cum 350.00 677.30 -
Formworks 23.00 sm 250.00 5,750.00 -
Rebars 250.00 kgs 4.50 1,125.00 -

7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00


-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00

12 stair and catwalk railing


stair with railing 1 set 15,000.00 15,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02

Total amount Php 1,386,000.00 TOTAL 1,185,386.64


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,917.00
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 20
Date : JUNE 16,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 85.05 100% 29,767.50
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 140.00 100% 49,000.00
Formworks 1,293.00 sm 250.00 323,250.00 1,293.00 100% 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00 36,750.00 100% 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,737.00 7.82 100% 2,737.00
Formworks 54.00 sm 250.00 13,500.00 54.00 100% 13,500.00
Rebars 1,150.00 kgs 4.50 5,175.00 1,150.00 100% 5,175.00

6 CATWALK
Concrete 3.62 cum 350.00 1,267.00 1.20 100% 420.00
Formworks 28.00 sm 250.00 7,000.00 10.30 100% 2,575.00
Rebars 285.94 kgs 4.50 1,286.73 129.00 100% 580.50

7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00


-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00
12 stair and catwalk railing
stair with railing 1 set 20,000.00 20,000.00
railings 54 lm 550.00 29,700.00

13 exterior plastering /painting


ground level tank 335.64015 sqm 250.00 83,910.04

Total amount Php 1,426,565.51 TOTAL 1,249,324.14


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,900.00
bill 20 63,954.50
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 21
Date : JUNE 23,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


1 Mat Foundtaion
Concrete 215.04 cum 350.00 75,264.00 215.04 100% 75,264.00
Formworks 53.76 sm 250.00 13,440.00 53.76 100% 13,440.00
Rebars 18,050.00 kgs 4.50 81,225.00 18,050.00 100% 81,225.00

2 UNDER GROUND WALLS (3m)


Concrete 85.05 cum 350.00 29,767.50 85.05 100% 29,767.50
Formworks 567.00 sm 250.00 141,750.00 567.00 100% 141,750.00
Rebars 13,977.00 kgs 4.50 62,896.50 13,977.00 100% 62,896.50

3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00

4 2ND FLOOR WALL (6M)


Concrete 129.28 cum 350.00 45,246.60 140.00 100% 49,000.00
Formworks 1,293.00 sm 250.00 323,250.00 1,293.00 100% 323,250.00
Rebars 36,750.00 kgs 4.50 165,375.00 36,750.00 100% 165,375.00

5 PUMP AND FILTER AREA


Concrete 7.82 cum 350.00 2,737.00 7.82 100% 2,737.00
Formworks 54.00 sm 250.00 13,500.00 54.00 100% 13,500.00
Rebars 1,150.00 kgs 4.50 5,175.00 1,150.00 100% 5,175.00

6 CATWALK
Concrete 5.75 cum 350.00 2,012.50 5.75 100% 2,012.50
Formworks 28.00 sm 250.00 7,000.00 28.00 100% 7,000.00
Rebars 319.00 kgs 4.50 1,435.50 319.00 100% 1,435.50

7 ROOF BEAMS
Concrete 1.60 cum 350.00 560.00 -
Formworks 38.00 sm 250.00 9,500.00 -
Rebars 222.00 kgs 4.50 999.00 -

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 165.00 kgs 4.50 742.50 -
-
9 PUMP room -
CHB 4'' wall 52.00 sqm 180.00 9,360.00 -
Plastering on CHB wall 104.00 sqm 150.00 15,600.00 -
roof framing 24.75 sqm 250.00 6,187.50 - nasa taas n mga
gamit para jan sir
roofing 24.75 sqm 300.00 7,425.00 - gwin n yan bukas
painting 102.00 sqm 250.00 25,500.00 -

10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 100% 50,000.00


-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 100% 36,000.00

12 stair and catwalk railing


stair with railing 1 set 20,000.00 20,000.00
railings 54 lm 550.00 29,700.00 54 30% 8,910.00 sila eric
magfabricate na agad
ng railing yn
13 exteriorpainting tomorrow
ground level tank 342 sqm 250.00 85,500.00 81 100% 20,250.00 sir wala pondo
pintor pasok din sila
lingo bukas daw
mputian n nila yan
isang side
Total amount Php 1,467,617.24 TOTAL 1,285,356.64
Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,900.00
bill 20 63,954.50
bill 21 36,032.50
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 22
Date : JUNE 30,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


7 ROOF BEAMS
Concrete 1.60 cum 350.00 560.00
Formworks 38.00 sm 250.00 9,500.00
Rebars 222.00 kgs 4.50 999.00

8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00 REMOVE FROM
Rebars 165.00 kgs 4.50 742.50 CONTRACT SIR TAO
9 PUMP room NYU NALANG PO
CHB 4'' wall 52.00 sqm 180.00 9,360.00
Plastering on CHB wall 104.00 sqm 150.00 15,600.00
roof framing 24.75 sqm 250.00 6,187.50
roofing 24.75 sqm 300.00 7,425.00
painting 102.00 sqm 250.00 25,500.00

12 stair and catwalk railing


stair with railing 1 set 20,000.00 20,000.00 1 20% 4,000.00
railings 54 lm 550.00 29,700.00 54 80% 23,760.00

13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 171 90% 38,475.00

Total amount Php 1,467,617.24 TOTAL 1,322,431.64


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,900.00
bill 20 63,954.50
BILL 21 36,032.50
bill 22 37,075.00
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 23
Date : July 7,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST

12 stair and catwalk railing


stair with railing 1 set 20,000.00 20,000.00 1 70% 14,000.00
railings 54 lm 550.00 29,700.00 54 100% 29,700.00

13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 171 90% 38,475.00
90 70% 15,750.00

Total amount Php 1,467,617.24 TOTAL 1,354,121.64


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,900.00
bill 20 63,954.50
BILL 21 36,032.50
bill 22 37,075.00
bill 23 31,690.00
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 24
Date : July 14,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST

12 stair and catwalk railing


stair with railing 1 set 20,000.00 20,000.00 1 100% 20,000.00
railings 54 lm 550.00 29,700.00 54 100% 29,700.00

13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 256 90% 57,600.00
86 65% 13,975.00
stair with railing 1.00 set 3,000.00 3,000.00 1 0% -
railings 54.00 km 100.00 5,400.00 54 75% 4,050.00
Total amount Php 1,467,617.24 TOTAL 1,381,521.64
Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,900.00
bill 20 63,954.50
BILL 21 36,032.50
bill 22 37,075.00
bill 23 31,690.00
bill 24 27,400.00
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 25
Date : July 21,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST

12 stair and catwalk railing


stair with railing 1 set 20,000.00 20,000.00 1 100% 20,000.00
railings 54 lm 550.00 29,700.00 54 100% 29,700.00

13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 342 90% 76,950.00
stair with railing 1.00 set 3,000.00 3,000.00 1 90% 2,700.00
railings 54.00 km 100.00 5,400.00 54 90% 4,860.00

pump room painting 145.00 sqm 250.00 36,250.00 145 55% 19,937.50

Total amount Php 1,467,617.24 TOTAL 1,410,344.14


Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 23 31,690.00
bill 24 27,400.00
bill 25 28,822.50
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 26
Date : July 28,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST

12 stair and catwalk railing


stair with railing 1 set 20,000.00 20,000.00 1 100% 20,000.00
railings 54 lm 550.00 29,700.00 54 100% 29,700.00

13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 252 95% 59,850.00
90 85% 19,125.00
stair with railing 1.00 set 3,000.00 3,000.00 1 95% 2,850.00
railings 54.00 km 100.00 5,400.00 54 95% 5,130.00
wall (0.3m) 105.00 LM 100.00 10,500.00

pump room painting 154.36 sqm 250.00 38,590.00 154.36 80% 30,872.00

Total amount Php 1,467,617.24 TOTAL 1,423,723.64


Pheby Moog LESS bill 1 16,000.00
bill 22 37,075.00
bill 23 31,690.00
bill 24 27,400.00
BILL 25 18,945.00
bill 26 23,257.00
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 27
Date : AUGUST 4,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 342 100% 85,500.00
stair with railing 1.00 set 3,000.00 3,000.00 1 100% 3,000.00
railings 54.00 km 100.00 5,400.00 54 100% 5,400.00
wall (0.3m) 57.00 LM 100.00 5,700.00 57.00 90% 5,130.00

pump room painting 154.36 sqm 250.00 38,590.00 154.36 95% 36,660.50

Total amount Php 1,467,617.24 TOTAL 1,441,587.14


Pheby Moog LESS bill 1 16,000.00
bill 22 37,075.00
bill 23 31,690.00
bill 24 27,400.00
BILL 25 18,945.00
bill 26 23,257.00
bill 27 17,863.50
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 28
Date : AUGUST 11,2022

DESCRIPTION QTY UNT UNIT COST TOTAL COST


13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 342 100% 85,500.00
stair with railing 1.00 set 3,000.00 3,000.00 1 100% 3,000.00
railings 54.00 km 100.00 5,400.00 54 100% 5,400.00
wall (0.3m) 57.00 LM 100.00 5,700.00 57.00 100% 5,700.00

pump room painting 154.36 sqm 250.00 38,590.00 154.36 100% 38,590.00

Total amount Php 1,467,617.24 TOTAL 1,444,086.64


Pheby Moog LESS bill 1 16,000.00
bill 22 37,075.00
bill 23 31,690.00
bill 24 27,400.00
BILL 25 18,945.00
bill 26 23,257.00
BILL 27 17,863.50
bill 28 2,499.50
JASON 5 10 1.25 6.25 750 4687.5
ABET 7 14 1.75 8.75 600 5250
ROD 7 14 1.75 8.75 500 4375
RICHARD 5 5 0.625 5.625 500 2812.5
LAW 6 8 1 7 500 3500

JASON 6 11 1.375 7.375 750 5531.25


ABET 5 17 2.125 7.125 600 4275
ROD 5 17 2.125 7.125 500 3562.5
RICHARD 6 8 1 7 500 3500
LAW 6 8 1 7 500 3500

JASON 5 18 2.25 7.25 750 5437.5


ABET 6 20 2.5 8.5 600 5100
ROD 6 18 2.25 8.25 500 4125
RICHARD 5 10 1.25 6.25 500 3125
LAW 5 12 1.5 6.5 500 3250
JASON 4 13 1.625 5.625 750 4218.75
ABET 7 20 2.5 9.5 600 5700
ROD 6 18 2.25 8.25 500 4125
RICHARD 4 6 0.75 4.75 500 2375
LAW 7 2 0.25 7.25 500 3625
edison 1 850 3
ste man 5 700 3
labor 2 500 3

CA
1000 3687.5 edison 1 850 6
500 4750 ste man 4 700 6
500 3875 labor 2 500 6
500 2312.5 skilled 2 600 6
500 3000 labor 5 500 6
17625
4000
21625

CA
1000 4531.25
500 3775 activity trimming on culvert sides
500 3062.5 rate man power
500 3000 labor workers 500 4
500 3000
17368.75
4000 8
21368.75 12
8
28
3.5

CA edison 1 850 5
500 4937.5 ste man 5 700 5
500 4600 labor 3 500 5
500 3625
600 2525
500 2750 jun 1 850 3
18437.5 skilled 2 600 3
4000 labor 10 500 3
22437.5
CA
500 3718.75 1 edison 8 8 16
500 5200 2 larry 8 8 16
500 3625 3 benok 8 8
500 1875 4 lito 6 8 14
500 3125 5 jesus 0 8 8
17543.75 6 loreto 0 8 8
4000 7 lester 6 6
21543.75 8 dennis 6 6
9
10
11
12
0 0 3 2550
0 0 3 10500
0 0 3 3000
16050

15 1.875 7.875 6693.75


15 1.875 7.875 22050
15 1.875 7.875 7875
15 1.875 7.875 9450
15 1.875 7.875 19687.5

65756.25
4000

64,500.00

days 8181.25
3 6000 72,681.25
10 68,281.25
2
0
4
0
0
0
4
16 2 7 5950
16 2 7 24500
16 2 7 10500
48 40950

8 1 4 3400
8 1 4 4800
8 1 4 20000
28200
69150
850 106.25 1700
700 87.5 1400
700 87.5 700
700 87.5 1225
700 87.5 700
700 87.5 700
500 62.5 375
500 62.5 375
7175
total installed as of april 14

Quantity size Length Total weight


foundation 116.00 pcs 25mmø 10.5 3.85 4,689.30
33.00 pcs 25mmø 9 3.85 1,143.45
33.00 pcs 25mmø 7.5 3.85 952.88
81.00 pcs 25mmø 5.5 3.85 1,715.18
34.00 pcs 25mmø 3.5 3.85 458.15

68 pcs 20mmø 10.5 2.47 1763.58


66 pcs 20mmø 9 2.47 1467.18
20 pcs 20mmø 3 2.47 148.2
TOTAL WEIGHT INSTALLED IN KGS 12,337.91
walls 538 pcs 20mmø 4.5 2.47 5979.87
208 pcs 12mmø 9 0.888 1662.336
TOTAL WEIGHT INSTALLED IN KGS 7642.206