gf walls
CONCRETING 15 6 0.3 3 81 85.05
formworks 15 3 6 2 540 567
SLAB
CONCRETING 0.2 15 15 45 47.25
0.3 0.4 15 1.8 1.89
0.3 0.4 15 1.8 1.89
0.3 0.4 5.4 0.648 0.6804
51.7104
FORMWORKS
15 15 1 225 236.25
15 0.2 4 12 12.6
0.3 2 15 9 9.45
0.3 2 15 9 9.45
15 0.2 4 12 12.6
280.35
REBARS
top 76 76 16 1216 202.6667 203 25mm
76 76 16 1216 202.6667 203 25mm
beams
top 16 1 4 64 10.66667 11.2 12.00
bot 16 1 4 64 10.66667 11.2 11
beams
top 11 1 4 44 7.333333 7.7 8.00
bot 11 1 4 44 7.333333 7.7 8
14.1
95 105 1.9 1 105 35 35
9.1
61.6666666667 72 1.9 1 72 24 24
4.14
28.6 39 1.9 2 78 26 26
10 81 81 7.5 2 1 1215
6 21 21 12 2 1 504
REBARS
SLAB 10.6 71.66667 22 4.14 91.08 15.18 15.939
3.14 11.46667 12 11.6 139.2 23.2 24.36
BEAMS 10.6
2B1 11.6 2 2 46.4 7.733333 8.12 8
11.6 2 2 46.4 7.733333 8.12 8
54 54 1.7 2 183.6 30.6 32.00
2EB1 1.63
2.63 2 1 5.26 0.876667 0.9205 1
2.63 2 1 5.26 0.876667 0.9205 1
9.15 10 1.4 1 14 2.333333 3.00
2B1 3.14
4.14 2 3 24.84 4.14 4.347 5
4.14 2 3 24.84 4.14 4.347 5
16.7 11 1.7 3 56.1 9.35 10.00
2CB1 2
3 4 1 12 2 2.1 2
3 2 1 6 1 1.05 1
11 11 1.5 1 16.5 2.75 3.00
2CB1 2
3 5 1 15 2.5 2.625 3
3 2 1 6 1 1.05 1
11 11 1.9 1 20.9 3.483333 4.00
roof beams
3.15 2 0.4 0.2 0.504 0.5292
5.14 2 0.4 0.2 0.8224 0.86352
1.39272
rebars 3.15
4.15 2 2 16.6 2.766667 2.905 3
4.15 2 2 16.6 2.766667 2.905 3
16.75 18 1.3 2 46.8 7.8 8.00
5.14
6.14 2 2 24.56 4.093333 4.298 5
6.14 2 2 24.56 4.093333 4.298 4
26.7 30 1.3 2 78 13 13.00
planted columns
3 4 0.4 0.2 0.96 1.008
1.008
rebars 3
4 2 4 32 5.333333 5.6 6
4 2 4 32 5.333333 5.6 6
16 18 1.3 2 46.8 7.8 8.00
23.10 7,392.00
14.82 2,445.30
23.10 5,359.20
23.10 3,141.60
1.43
25mm 23.10 184.80
25mm 23.10 184.80
16.00
25.00
41.00 82.00 12MM 5.33 436.90
- -
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Date : JANUARY 011, 2022
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00
6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50
9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT
PREPARE BY:
Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REABRWORKS AND TRIMMING)
Date : JANUARY 011, 2022
3 GF SLAB
Concrete 51.71 cum 350.00
6 CATWALK
Concrete 1.94 cum 350.00
7 ROOF BEAMS
Concrete 1.39 cum 350.00
8 PLANTED COLUMNS
Concrete 1.01 cum 350.00
9 PUMP room
CHB 4'' wall 45.00 sqm 180.00
Plastering on CHB wall 90.00 sqm 150.00
13 exterior plastering
ground level tank 336 sqm 150.00
EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT
3. GRAVEL BEDDING
PREPARE BY:
Pheby Moog
TOTAL COST
MD MP
75,264.00 43.01 6.00 DAYS 700.00 15.00 63,000.00 #REF!
44.00 PER DAY
5.50
15,000.00
29,568.00
72.00
50.00 +
567.00 196.875
64.00 0 280.35 97.34375
1,292.76 448.875
54.26 18.84108
23.22 8.063125
22866.4
34915.87
alejo 6 20
pintor 6 20
149.625 246.9688 2.5
26 38
114
2.5 8.5 750 6375
2.5 8.5 600 5100
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 1
Date : FEBRUARY 3, 2022
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00
6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50
9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
bill 1 14,076.00
EXCLUSIONS:
1. WATER PROOFING AND PAINTING
2. PIPING AND EQUIPMENT
PREPARE BY:
Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 2
Date : FEBRUARY 10, 2022
Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 3
Date : FEBRUARY 17, 2022
note ca 5k
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 4
Date : FEBRUARY 24, 2022
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00
6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50
9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
ca 5k
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 5
Date : MARCH 3, 2022
Pheby Moog
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 6
Date : MARCH 10, 2022
10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 60% 30,000.00 no movement
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 70% 25,200.00 no movement
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64
Formworks 280.00 sm 250.00 70,000.00 59 80% 11,800.00
Rebars 24,060.00 kgs 4.50 108,270.00
6 CATWALK
Concrete 1.94 cum 350.00 677.30
Formworks 23.00 sm 250.00 5,750.00
Rebars 250.00 kgs 4.50 1,125.00
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00
Formworks 17.00 sm 250.00 4,250.00
Rebars 222.00 kgs 4.50 999.00
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00
Rebars 145.00 kgs 4.50 652.50
9 PUMP room
CHB 4'' wall 45.00 sqm 180.00 8,100.00
Plastering on CHB wall 90.00 sqm 150.00 13,500.00
roof framing 17.00 sqm 250.00 4,250.00
roofing 17.00 sqm 300.00 5,100.00
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 -
Formworks 280.00 sm 250.00 70,000.00 67.50 100% 16,875.00
Rebars 24,060.00 kgs 4.50 108,270.00 6,368.82 100% 28,659.71
-
10 Supervision fee on excavtion 1.00 lot 50,000.00 50,000.00 1 90% 45,000.00
-
11 GRAVEL BED 200.00 CUM 180.00 36,000.00 200 85% 30,600.00
3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 45 100% 15,750.00
Formworks 280.00 sm 250.00 70,000.00 136.00 80% 27,200.00
Rebars 24,060.00 kgs 4.50 108,270.00 13,374.00 100% 60,183.00
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 45 100% 15,750.00
Formworks 280.00 sm 250.00 70,000.00 136.00 80% 27,200.00
Rebars 24,060.00 kgs 4.50 108,270.00 13,374.00 100% 60,183.00
3 GF SLAB -
Concrete 51.71 cum 350.00 18,098.64 45 100% 15,750.00
Formworks 280.00 sm 250.00 70,000.00 136.00 80% 27,200.00
Rebars 24,060.00 kgs 4.50 108,270.00 installed 13,374.00 100% 60,183.00
fabricated 10,686.00 50% 24,043.50
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 136.00 100% 34,000.00
144.00 80% 28,800.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00
6 CATWALK
Concrete 1.94 cum 350.00 677.30 -
Formworks 23.00 sm 250.00 5,750.00 -
Rebars 250.00 kgs 4.50 1,125.00 -
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00
6 CATWALK
Concrete 1.94 cum 350.00 677.30 -
Formworks 23.00 sm 250.00 5,750.00 -
Rebars 250.00 kgs 4.50 1,125.00 -
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -
13 exterior plastering
ground level tank 335.64015 sqm 150.00 50,346.02
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00
6 CATWALK
Concrete 3.62 cum 350.00 1,267.00 1.20 100% 420.00
Formworks 28.00 sm 250.00 7,000.00 10.30 100% 2,575.00
Rebars 285.94 kgs 4.50 1,286.73 129.00 100% 580.50
7 ROOF BEAMS
Concrete 1.30 cum 350.00 455.00 -
Formworks 17.00 sm 250.00 4,250.00 -
Rebars 222.00 kgs 4.50 999.00 -
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 145.00 kgs 4.50 652.50 -
-
9 PUMP room -
CHB 4'' wall 45.00 sqm 180.00 8,100.00 -
Plastering on CHB wall 90.00 sqm 150.00 13,500.00 -
roof framing 17.00 sqm 250.00 4,250.00 -
roofing 17.00 sqm 300.00 5,100.00 -
3 GF SLAB
Concrete 51.71 cum 350.00 18,098.64 51.71 100% 18,098.64
Formworks 280.00 sm 250.00 70,000.00 280.00 100% 70,000.00
Rebars 24,060.00 kgs 4.50 108,270.00 24,060.00 100% 108,270.00
6 CATWALK
Concrete 5.75 cum 350.00 2,012.50 5.75 100% 2,012.50
Formworks 28.00 sm 250.00 7,000.00 28.00 100% 7,000.00
Rebars 319.00 kgs 4.50 1,435.50 319.00 100% 1,435.50
7 ROOF BEAMS
Concrete 1.60 cum 350.00 560.00 -
Formworks 38.00 sm 250.00 9,500.00 -
Rebars 222.00 kgs 4.50 999.00 -
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00 -
Formworks 15.00 sm 250.00 3,750.00 -
Rebars 165.00 kgs 4.50 742.50 -
-
9 PUMP room -
CHB 4'' wall 52.00 sqm 180.00 9,360.00 -
Plastering on CHB wall 104.00 sqm 150.00 15,600.00 -
roof framing 24.75 sqm 250.00 6,187.50 - nasa taas n mga
gamit para jan sir
roofing 24.75 sqm 300.00 7,425.00 - gwin n yan bukas
painting 102.00 sqm 250.00 25,500.00 -
8 PLANTED COLUMNS
Concrete 1.00 cum 350.00 350.00
Formworks 15.00 sm 250.00 3,750.00 REMOVE FROM
Rebars 165.00 kgs 4.50 742.50 CONTRACT SIR TAO
9 PUMP room NYU NALANG PO
CHB 4'' wall 52.00 sqm 180.00 9,360.00
Plastering on CHB wall 104.00 sqm 150.00 15,600.00
roof framing 24.75 sqm 250.00 6,187.50
roofing 24.75 sqm 300.00 7,425.00
painting 102.00 sqm 250.00 25,500.00
13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 171 90% 38,475.00
13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 171 90% 38,475.00
90 70% 15,750.00
13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 256 90% 57,600.00
86 65% 13,975.00
stair with railing 1.00 set 3,000.00 3,000.00 1 0% -
railings 54.00 km 100.00 5,400.00 54 75% 4,050.00
Total amount Php 1,467,617.24 TOTAL 1,381,521.64
Pheby Moog LESS bill 1 16,000.00
BILL 2 10,000.00
bill 3 12,813.50
bill 4 14,871.07
BILL 5 18,101.65
BILL 6 83,982.00
BILL 7 32,599.68
BILL 8 10,000.00
BILL 9 26,514.34
BILL 10 43,375.00
BILL 11 63,776.40
bill 12 75,905.87
bill 13 160,360.79
bill 14 85,299.20
bill 15 91,568.60
bill 16 118,000.00
bill 17 102,401.54
bill 18 120,900.00
bill 19 98,900.00
bill 20 63,954.50
BILL 21 36,032.50
bill 22 37,075.00
bill 23 31,690.00
bill 24 27,400.00
Project: VITAS STP
Subject: LABOR COST PROPOSAL (CONCRETING, FORMWORKS, REBARWORKS AND TRIMMING)
Bill 25
Date : July 21,2022
13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 342 90% 76,950.00
stair with railing 1.00 set 3,000.00 3,000.00 1 90% 2,700.00
railings 54.00 km 100.00 5,400.00 54 90% 4,860.00
pump room painting 145.00 sqm 250.00 36,250.00 145 55% 19,937.50
13 exteriorpainting
ground level tank 342 sqm 250.00 85,500.00 252 95% 59,850.00
90 85% 19,125.00
stair with railing 1.00 set 3,000.00 3,000.00 1 95% 2,850.00
railings 54.00 km 100.00 5,400.00 54 95% 5,130.00
wall (0.3m) 105.00 LM 100.00 10,500.00
pump room painting 154.36 sqm 250.00 38,590.00 154.36 80% 30,872.00
pump room painting 154.36 sqm 250.00 38,590.00 154.36 95% 36,660.50
pump room painting 154.36 sqm 250.00 38,590.00 154.36 100% 38,590.00
CA
1000 3687.5 edison 1 850 6
500 4750 ste man 4 700 6
500 3875 labor 2 500 6
500 2312.5 skilled 2 600 6
500 3000 labor 5 500 6
17625
4000
21625
CA
1000 4531.25
500 3775 activity trimming on culvert sides
500 3062.5 rate man power
500 3000 labor workers 500 4
500 3000
17368.75
4000 8
21368.75 12
8
28
3.5
CA edison 1 850 5
500 4937.5 ste man 5 700 5
500 4600 labor 3 500 5
500 3625
600 2525
500 2750 jun 1 850 3
18437.5 skilled 2 600 3
4000 labor 10 500 3
22437.5
CA
500 3718.75 1 edison 8 8 16
500 5200 2 larry 8 8 16
500 3625 3 benok 8 8
500 1875 4 lito 6 8 14
500 3125 5 jesus 0 8 8
17543.75 6 loreto 0 8 8
4000 7 lester 6 6
21543.75 8 dennis 6 6
9
10
11
12
0 0 3 2550
0 0 3 10500
0 0 3 3000
16050
65756.25
4000
64,500.00
days 8181.25
3 6000 72,681.25
10 68,281.25
2
0
4
0
0
0
4
16 2 7 5950
16 2 7 24500
16 2 7 10500
48 40950
8 1 4 3400
8 1 4 4800
8 1 4 20000
28200
69150
850 106.25 1700
700 87.5 1400
700 87.5 700
700 87.5 1225
700 87.5 700
700 87.5 700
500 62.5 375
500 62.5 375
7175
total installed as of april 14