Vous êtes sur la page 1sur 1

IT-BTP

Memorandum
To: Judmy Charles
From: Raoul Turnier
CC: Jerry Sanon
Re: Design Update

1. Notes generales a ajouter :


a. Dessins de Plomberie:
i. “All exposed PVC piping (waste and water supply) shall be
properly protected from both physical and UV sunlight
damage”
ii. “All existing septic tanks to which the new piping is being
connected shall be completely cleaned out and inspected for
cracks/leakage before being connected to the system.
b. Dessins d’Electricité:
i. “All exposed PVC electrical conduits shall be properly protected
from both physical and UV sunlight damage “.
ii. “All electrical equipment installed outdoors shall be provided
with raintight enclosures.”
2. Details a fournir:
a. Details de contruction des toitures – elements verticaux et horizontaux
b. Details de connections entre la toiture et les containers
c. Details de connections entre la toiture et les panneaux solaires
3. Ajout/Correction
a. Changez les “Inverter Closets” de place. i.e mettez les contre les containeurs
pour raison de securite
b. Ajoutez dans le tableau des portes que les portes des “Inverter Closets” seront
protegees avec de la peinture anti-rouille
c. Allongez la toirtures des “inverter Closets” pour permettre l’eau de pluie de
s’ecouler.