Réseau Incendie
Magasin central 1
Magasin central 2
Magasins BZ
Magasins Pneu
Réseau Incendie
Magasins central
Station de gasoil
Zone de stockage (Huiles)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Station de gasoil
CHARGEMENT TRAIN
Réseau Incendie
Réseau Incendie
Magasin central 1
Magasin central 2
Magasins BZ
Magasins Pneu
Réseau Incendie
Réseau Incendie
Station de gasoil
Zone de stockage (Huiles)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Station de gasoil
CHARGEMENT TRAIN
Général Général Général
Réseau Incendie
Réseau Incendie
Magasin central 1
Magasin central 2
Magasins BZ
Magasins Pneu
Réseau Incendie
Magasins central
Magasins Pneu
Réseau Incendie
Magasins central
Réseau Incendie
Réseau Incendie
Magasin central 1
Magasin central 2
Magasins BZ
Magasins Pneu
Réseau Incendie
Réseau Incendie
Station de gasoil
Zone de stockage (Huiles)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Postes électriques (P1A/1B/1C/1D/ 1 to 5 PSF)
Station de gasoil
CHARGEMENT TRAIN
Réseau Incendie
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
Général Général Général
POSTE 60KV P1 Général Général
POSTE 60KV P2 Général Général
POSTE 22KV STEP Général Général
POSTE 22KV N'ZALAT Général Général
SITUATI
Entité
CALCULATIONS
CERTIFICATION
DATA SHEETS
ELECTRICAL
FIRE PROTECTION ISOMETRIC DRAWI
FIRE PROTECTION P&ID DRAWINGS
FIRE PROTECTION SYSTEM
MANUALS
PROCEDURES
Activity Name
FIRE ALAM ARCHITECTURAL MAGASIN 0300 MC
FIRE ALAM ARCHITECTURAL MAGASIN 0918 MC
FIRE ALAM ARCHITECTURAL MAGASIN 0200 MC
FIRE ALAM ARCHITECTURAL MAGASIN CEM MC
FIRE ALAM ARCHITECTURAL MAGASIN CEM MP1
FIRE ALAM ARCHITECTURAL MAGASIN S0300 MP2
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE MT
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE D'E
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE OND
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE DCS
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE EMS
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE HT
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -HT 4L 313-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -MT 32-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE MT
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE MT
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE BT
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE PD1
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE CEN
FIRE ALAM DRAWINGS MAGASIN 0300 MC
FIRE ALAM DETECTION DRAWINGS MAGASIN 0918 MC
FIRE ALAM DETECTION ADRAWINGS MAGASIN 0200 MC
FIRE ALAM DETECTION DRAWINGS MAGASIN CEM MC
FIRE ALAM DETECTION DRAWINGS MAGASIN CEM MP1
FIRE ALAM DETECTION DRAWINGS MAGASIN S0300 MP2
FIRE ALARM DETECTION DRAWING --SALLE MT NC-
FIRE ALARM DETECTION DRAWING -SALLE D'EXCITATION/PROTECTION-
FIRE ALARM DETECTION DRAWING -SALLE ONDULEUR PS3-
FIRE ALARM DETECTION DRAWING -SALLE DCS NC-
FIRE ALARM DETECTION DRAWING -SALLE EMS ET AIGUILLAGE-
FIRE ALARM DETECTION DRAWING -POSTE HT AL-
FIRE ALARM DETECTION DRAWING -HT 4L 313-
FIRE ALARM DETECTION DRAWING -MT 32-
FIRE ALARM DETECTION DRAWING -POSTE MT 311-
FIRE ALARM DETECTION DRAWING -POSTE MT MP2-
FIRE ALARM DETECTION DRAWING -POSTE BT CENTRALE-
FIRE ALARM DETECTION DRAWING -POSTE PD1 MT/BT-
FIRE ALARM DETECTION DRAWING -POSTE CENTRALE BT-
CAUSE & EFFECT DIAGRAM--SALLE MT NC-
CAUSE & EFFECT DIAGRAM-SALLE D'EXCITATION/PROTECTION-
CAUSE & EFFECT DIAGRAM-SALLE ONDULEUR PS3-
CAUSE & EFFECT DIAGRAM-SALLE DCS NC-
CAUSE & EFFECT DIAGRAM-SALLE EMS ET AIGUILLAGE-
CAUSE & EFFECT DIAGRAM-POSTE HT AL-
CAUSE & EFFECT DIAGRAM-HT 4L 313-
CAUSE & EFFECT DIAGRAM-MT 32-
CAUSE & EFFECT DIAGRAM-POSTE MT 311-
CAUSE & EFFECT DIAGRAM-POSTE MT MP2-
CAUSE & EFFECT DIAGRAM-POSTE BT CENTRALE-
CAUSE & EFFECT DIAGRAM-POSTE PD1 MT/BT-
CAUSE & EFFECT DIAGRAM-POSTE CENTRALE BT-
CAUSE & EFFECT DIAGRAM-SALLE MT NC-
FACP WIRING DIAGRAM MAGASIN 0300 MC
FACP WIRING DIAGRAM MAGASIN 0918 MC
FACP WIRING DIAGRAM MAGASIN 0200 MC
FACP WIRING DIAGRAM MAGASIN CEM MC
FACP WIRING DIAGRAM MAGASIN CEM MP1
FACP WIRING DIAGRAM MAGASIN S0300 MP2
FACP WIRING DIAGRAM-SALLE D'EXCITATION/PROTECTION-
FACP WIRING DIAGRAM-SALLE ONDULEUR PS3-
FACP WIRING DIAGRAM-SALLE DCS NC-
FACP WIRING DIAGRAM-SALLE EMS ET AIGUILLAGE-
FACP WIRING DIAGRAM-POSTE HT AL-
FACP WIRING DIAGRAM-HT 4L 313-
FACP WIRING DIAGRAM-POSTE CENTRALE BT-
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MC
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP1
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP2
FIRE WATER MAIN LOOP EXTENSION DRAWINGS PORT
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0300 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0918 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0200 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MP1
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN S0300 MP2
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"NC"
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"MT32"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT311"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "HT 4L 314"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT MP2"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "BT CENTRALE "
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT/BT SULFURIQUE & SULFA
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE MT NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE D'EXCITATION/PROTECTION-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE ONDULEUR PS3-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE DCS NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE EMS ET AIGUILLAGE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE HT AL-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -HT 4L 313-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -MT 32-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE CENTRALE BT-
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MC
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP1
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP2
FIRE WATER MAIN LOOP EXTENSION DRAWINGS PORT
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0300 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0918 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0200 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MP1
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN S0300 MP2
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"NC"
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"MT32"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT311"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "HT 4L 314"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT MP2"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "BT CENTRALE "
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT/BT SULFURIQUE & SULFACID "
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE MT NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE D'EXCITATION/PROTECTION-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE ONDULEUR PS3-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE DCS NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE EMS ET AIGUILLAGE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE HT AL-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -HT 4L 313-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -MT 32-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE MT 311-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE MT MP2-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE BT CENTRALE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE PD1 MT/BT-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE CENTRALE BT-
FIRE WATER MAIN LOOP EXTENSION PID DRAWINGS MC
FIRE WATER MAIN LOOP EXTENSION PID DRAWINGS MP1
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "MT311"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "HT 4L 314"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "MT MP2"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "BT CENTRALE "
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "MT/BT SULFURIQUE & S
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE MT NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE D'EXCITATION/PROTECTION-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE ONDULEUR PS3-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE DCS NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE EMS ET AIGUILLAGE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE HT AL-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -HT 4L 313-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -MT 32-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE MT 311-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE MT MP2-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE BT CENTRALE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE PD1 MT/BT-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE CENTRALE BT-
CALCULATION NOTE OF WATER MAIN LOOP & HYDRANT IMPLANTATION
POWER NEED CALCULATION -PUMPS ROOM-
FIRE DETECTION CALCULATION NOTE -MAGASIN CENTRAL 1-
FIRE DETECTION CALCULATION NOTE -MAGASIN CENTRAL 2-
FIRE DETECTION CALCULATION NOTE -MAGASIN CONTRÔLE BZ -
FIRE DETECTION CALCULATION NOTE - HANGAR DES PNEUS ET BANDES -
FIRE DETECTION CALCULATION NOTE -PUMPS ROOM-
FACP BATTERY CALCULATION NOTE -MAGASIN CENTRAL 1 / 2 / MAGASIN CONTRÔLE BZ
FACP BATTERY CALCULATION NOTE - HANGAR DES PNEUS ET BANDES -
FACP BATTERY CALCULATION NOTE -PUMPS ROOM-
VOLTAGE DROP CALCULATION -FIRE ALARM SYSTEM-
VOLTAGE DROP CALCULATION -FIRE PUMPS -
CALCULATION NOTE FIRE DETECTION -PUMPS ROOM -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 1-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 2-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CONTRÔLE BZ -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - HANGAR DES PNEUS ET BANDES -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -PUMPS ROOM-
CALCULATION NOTE VENTILATION - PUMPS ROOM-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM STATION GASOIL
CALCULATION NOTE OF WATER SPRINKLER SYSTEM ZONE STOCKAGE HUILES
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1A)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1B)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1C)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1D)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (PSF 1)"
CALCULATION NOTE GAZ SYSTEM DRAWINGS "salle electrique (PSF 2)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (PSF 3)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (PSF 4)"
CALCULATION NOTE OF FOAM DELUGE SYSTEM STATION GASOIL
CALCULATION NOTE OF FOAM DELUGE SYSTEM DRAWINGS CHARGEMENT TRAIN
PUMPS ROOM CIVIL CALCULATION
DATA SHEET- NOZZLE OF GAZ SYSTEM
DATA SHEET - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
DATA SHEET - COUPLING FOR GAS SYSTEM
DATA SHEET- DELUGE VALVE
DATA SHEET- BLADDER TANK
DATA SHEET- FOAM NOZZLE
DATA SHEET- FOAM CONCENTRATE
DATA SHEET - SPRAY NOZZLE
DATA SHEET- BUTERFLY VALVE
DATA SHEET-DRAIN TEST VALVES
DATA SHEET- FLOW SWITCH
DATA SHEET- ALARM CHECK VALVE
DATA SHEET- SPRINKLER HEAD
DATA SHEET-CHECK VALVE
DATA SHEET- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
DATA SHEET- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORI
DATA SHEET- COUPLING
DATA SHEET-RIA
DATA SHEET-PRESSUR REDUCING VALVE
DATA SHEET- ADDRESSABLE FIRE & GAS ALARM SYSTEM
DATA SHEET- ADRESSABLE SMOKE DETECTOR
DATA SHEET- LINEAR HEAT DETECTOR
DATA SHEET- INDUSTRIAL HEAT DETECTOR
DATA SHEET- FLAME DETECTOR
DATA SHEET- GAS DETECTOR
DATASHEET- SMOKE DETECTOR INTRINSICALLY SAFE
DATA SHEET- MULTI-CRITEREA DETECTOR
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
DATA SHEET -INDOOR ALARM
DATA SHEET -OUTDOOR ALARM
DATA SHEET - REMOTE INDICATOR
DATA SHEET -CABLE CR1
DATA SHEET- POWER SUPPLY
DATA SHEET -OUTPUTS MODULE
DATA SHEET -INPUTS MODULE
FM- NOZZLE OF GAZ SYSTEM
FM - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
FM - COUPLING FOR GAS SYSTEM
FM- DELUGE VALVE
FM- BLADDER TANK
FM- FOAM NOZZLE
FM- FOAM CONCENTRATE
FM - SPRAY NOZZLE
FM- BUTERFLY VALVE
FM-DRAIN TEST VALVES
FM- FLOW SWITCH
FM- ALARM CHECK VALVE
FM- SPRINKLER HEAD
FM-CHECK VALVE
FM- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
FM- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
FM- COUPLING
NF-RIA
FM-PRESSUR REDUCING VALVE
FM- ADDRESSABLE FIRE & GAS ALARM SYSTEM
FM- ADRESSABLE SMOKE DETECTOR
FM- LINEAR HEAT DETECTOR
FM- INDUSTRIAL HEAT DETECTOR
FM- FLAME DETECTOR
FM- GAS DETECTOR
FM- SMOKE DETECTOR INTRINSICALLY SAFE
FM- MULTI-CRITEREA DETECTOR
FM -MANUAL ALARM CALL POINT DUAL ACTION
FM -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
FM -MANUAL ABORT STATION
FM -INDOOR ALARM
FM -OUTDOOR ALARM
FM - REMOTE INDICATOR
CABLE CR1
FM-OUTPUTS MODULE
FM -INPUTS MODULE
FM- POWER SUPPLY
PRE-COMMISSIONING AND COMMISSIONING MANUAL
OPERATION AND MAINTENANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
HYDROSTATIC & PNEUMATIC TEST PROCEDURE
FLUSHING TEST PROCEDURE
FIRE DETECTION SYSTEM TEST PROCEDURE
FIRE EXTINGUISHING SYSTEM (SPRINKLER ) TEST PROCEDURE
SAT TEST PROCEDURES -FIRE DETECTION & ALARM SYSTEM
SAT TEST REPORT - FIRE WATER SYSTEMS
SAT TEST REPORT -FIRE DETECTION & ALARM SYSTEM
ITP FOR FIRE SUPRESSION SYSTEMS
ITP FOR FIRE DETECTION & ALARM SYSTEM
QUALITY ASSURANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
TEST AND COMMISSIONING PROCEDURES / CHACK LISTS PER SYSTEM
ITP FOR FIRE DETECTION & ALARM SYSTEM
BE : DD 29/29/2022
AVANCEMENT REEL
80 1.27%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
35 0.55%
35 0.55%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
4 0.06%
40 0.63%
40 0.63%
35 0.55%
40 0.63%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
20 0.32%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
40 0.63%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
4 0.06%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
25 0.40%
CEMENT REEL
S-1 S Cumulés
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 14.48% 14.48%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
3.19% 1.48% 4.66%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
2022w22 2022w23 2022w24 0% 0%
4471500% 4471600% 4471700% 0% 0%
#DIV/0! 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
Avancement Global par Discipline
Avancement
CALCULATIONS 0.00%
CERTIFICATION 0.00%
DATA SHEETS 0.00%
ELECTRICAL 4.66%
FIRE PROTECTION ISOMETRIC D 0.00%
FIRE PROTECTION P&ID DRAWIN 0.00%
FIRE PROTECTION SYSTEM 0.00%
MANUALS 0.00%
PROCEDURES 0.00%
Avancement Total 4.66%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
2906555.0% 18393.01%
#DIV/0! #DIV/0!
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
0.0% 0.00%
Avancement Total en Heures
19.50
19.50
19.50
19.50
19.50
19.50
19.50
19.50
25.50
25.50
19.50
-
-
-
-
-
-
-
-
-
-
-
-
22.75
22.75
22.75
22.75
22.75
22.75
22.75
-
-
-
-
-
-
-
-
-
-
-
-
16.25
16.25
16.25
16.25
16.25
16.25
-
-
-
-
-
-
-
-
-
-
-
-
16.25
16.25
16.25
16.25
16.25
137.46
-
13.47
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,162,622.00
#DIV/0!
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
FF
Engineering Earned Value
Budget
ELECTRICAL 2,035 hrs
Name
IFR*
W36 1 9/9/2022
W37 2 9/16/2022
W38 3 9/23/2022
W39 4 9/30/2022
W40 5 10/7/2022
W41 6 10/14/2022
W42 7 10/21/2022
W43 8 10/28/2022
W44 9 11/4/2022
W45 10 11/11/2022
W46 11 11/18/2022
W47 12 11/25/2022
W48 13 12/2/2022
W49 14 12/9/2022
Earned vs Panned
Discipline
Activity
Name
FIRE ALAM ARCHITECTURAL MAGASIN 0300 MC
FIRE ALAM ARCHITECTURAL MAGASIN 0918 MC
FIRE ALAM ARCHITECTURAL MAGASIN 0200 MC
FIRE ALAM ARCHITECTURAL MAGASIN CEM MC
FIRE ALAM ARCHITECTURAL MAGASIN CEM MP1
FIRE ALAM ARCHITECTURAL MAGASIN S0300 MP2
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE MT NC-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE D'EXCITATION/PROTECTION-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE ONDULEUR PS3-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE DCS NC-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE EMS ET AIGUILLAGE-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE HT AL-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -HT 4L 313-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -MT 32-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE MT 311-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE MT MP2-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE BT CENTRALE-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE PD1 MT/BT-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE CENTRALE BT-
FIRE ALAM DRAWINGS MAGASIN 0300 MC
FIRE ALAM DETECTION DRAWINGS MAGASIN 0918 MC
FIRE ALAM DETECTION ADRAWINGS MAGASIN 0200 MC
FIRE ALAM DETECTION DRAWINGS MAGASIN CEM MC
FIRE ALAM DETECTION DRAWINGS MAGASIN CEM MP1
FIRE ALAM DETECTION DRAWINGS MAGASIN S0300 MP2
FIRE ALARM DETECTION DRAWING --SALLE MT NC-
FIRE ALARM DETECTION DRAWING -SALLE D'EXCITATION/PROTECTION-
FIRE ALARM DETECTION DRAWING -SALLE ONDULEUR PS3-
FIRE ALARM DETECTION DRAWING -SALLE DCS NC-
FIRE ALARM DETECTION DRAWING -SALLE EMS ET AIGUILLAGE-
FIRE ALARM DETECTION DRAWING -POSTE HT AL-
FIRE ALARM DETECTION DRAWING -HT 4L 313-
FIRE ALARM DETECTION DRAWING -MT 32-
FIRE ALARM DETECTION DRAWING -POSTE MT 311-
FIRE ALARM DETECTION DRAWING -POSTE MT MP2-
FIRE ALARM DETECTION DRAWING -POSTE BT CENTRALE-
FIRE ALARM DETECTION DRAWING -POSTE PD1 MT/BT-
FIRE ALARM DETECTION DRAWING -POSTE CENTRALE BT-
CAUSE & EFFECT DIAGRAM--SALLE MT NC-
CAUSE & EFFECT DIAGRAM-SALLE D'EXCITATION/PROTECTION-
CAUSE & EFFECT DIAGRAM-SALLE ONDULEUR PS3-
CAUSE & EFFECT DIAGRAM-SALLE DCS NC-
CAUSE & EFFECT DIAGRAM-SALLE EMS ET AIGUILLAGE-
CAUSE & EFFECT DIAGRAM-POSTE HT AL-
CAUSE & EFFECT DIAGRAM-HT 4L 313-
CAUSE & EFFECT DIAGRAM-MT 32-
CAUSE & EFFECT DIAGRAM-POSTE MT 311-
CAUSE & EFFECT DIAGRAM-POSTE MT MP2-
CAUSE & EFFECT DIAGRAM-POSTE BT CENTRALE-
CAUSE & EFFECT DIAGRAM-POSTE PD1 MT/BT-
CAUSE & EFFECT DIAGRAM-POSTE CENTRALE BT-
CAUSE & EFFECT DIAGRAM-SALLE MT NC-
FACP WIRING DIAGRAM MAGASIN 0300 MC
FACP WIRING DIAGRAM MAGASIN 0918 MC
FACP WIRING DIAGRAM MAGASIN 0200 MC
FACP WIRING DIAGRAM MAGASIN CEM MC
FACP WIRING DIAGRAM MAGASIN CEM MP1
FACP WIRING DIAGRAM MAGASIN S0300 MP2
FACP WIRING DIAGRAM-SALLE D'EXCITATION/PROTECTION-
FACP WIRING DIAGRAM-SALLE ONDULEUR PS3-
FACP WIRING DIAGRAM-SALLE DCS NC-
FACP WIRING DIAGRAM-SALLE EMS ET AIGUILLAGE-
FACP WIRING DIAGRAM-POSTE HT AL-
FACP WIRING DIAGRAM-HT 4L 313-
FACP WIRING DIAGRAM-MT 32-
FACP WIRING DIAGRAM-POSTE MT 311-
FACP WIRING DIAGRAM-POSTE MT MP2-
FACP WIRING DIAGRAM-POSTE BT CENTRALE-
FACP WIRING DIAGRAM-POSTE PD1 MT/BT-
FACP WIRING DIAGRAM-POSTE CENTRALE BT-
w Design Requirements
SCHEDULE IFR
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
30 1%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
35 2%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25 1%
25
25
25
25
25
25 1%
25 1%
25 1%
25 1%
25
2,035 92.63%
2,035 92.63%
RULES OF CREDIT
Basis of Design
ROC
Reports, Studies and Philosophy
ROC
Calculations and Analysis
ROC
Specifications and Data Sheets
ROC
Drawings subject to Inter Discipline Check
ROC
Drawings not subject to Inter Discipline Check
ROC
Drawings subject to HAZOP e.g. P&IDs
ROC
Engineering Requisitions
ROC
Technical Bid Evaluations
ROC
Engineering or Construction Work Packs
ROC
Other Generic Documents (subject to Customer Review)
ROC
Other Generic Documents (NOT subject to Customer Review)
ROC
Documents (Under Code 2 and Code 1 Approvals)
ROC
IFC CR IFD
Forecast / Actual Forecast / Actual Forecast / Actual
Start Finish Start Finish Start
S-CURVES
100%
Electrical – ENGINEERING S-CURVE
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
S-CURVE
IFP*
20%
IFP
15%
Status
Actual
0% 0%
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0% Not started
0%
0.00%
Engineering Earned Value
Budget
FIRE PROTECTION SYSTEM 1,040 hrs
Name
Earned vs Panned
Discipline
Activity
Name
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MC
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP1
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP2
FIRE WATER MAIN LOOP EXTENSION DRAWINGS PORT
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0300 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0918 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0200 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MP1
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN S0300 MP2
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"NC"
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"MT32"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT311"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "HT 4L 314"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT MP2"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "BT CENTRALE "
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT/BT SULFURIQUE & SULFACID "
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE MT NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE D'EXCITATION/PROTECTION-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE ONDULEUR PS3-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE DCS NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE EMS ET AIGUILLAGE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE HT AL-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -HT 4L 313-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -MT 32-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE MT 311-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE MT MP2-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE BT CENTRALE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE PD1 MT/BT-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE CENTRALE BT-
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
50 5% 5-Aug-22
50 5%
50 5%
50 5%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
40 4%
1,040 100.00%
1,040 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
FIRE PROTECTION1,240 hrs
Name
Earned vs Panned
Discipline Acti
Activity
Name
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MC
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP1
FIRE WATER MAIN LOOP EXTENSION DRAWINGS MP2
FIRE WATER MAIN LOOP EXTENSION DRAWINGS PORT
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0300 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0918 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN 0200 MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MC
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN CEM MP1
WATER FIRE SPRINKLER SYSTEM DRAWINGS MAGASIN S0300 MP2
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"NC"
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"MT32"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT311"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "HT 4L 314"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT MP2"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "BT CENTRALE "
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "MT/BT SULFURIQUE & SULFACID "
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE MT NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE D'EXCITATION/PROTECTION-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE ONDULEUR PS3-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE DCS NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -SALLE EMS ET AIGUILLAGE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE HT AL-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -HT 4L 313-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -MT 32-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE MT 311-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE MT MP2-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE BT CENTRALE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE PD1 MT/BT-
FK-5-1-12 FIRE SUPPRESSION SYSTEM DRAWINGS -POSTE CENTRALE BT-
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
50 4% 5-Aug-22 5-Aug-22
50 4% 5-Aug-22
50 4% 5-Aug-22
50 4% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3%
40 3%
40 3%
40 3%
40 3%
40 3%
40 3%
40 3%
40 3%
40 3%
40 3% 5-Aug-22
1,240 100.00%
1,240 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish
100%
100%
100%
100%
100%
100%
100%
26%
25.81%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
FIRE PROTECTI 600 hrs
Name
Earned vs Panned
Discipline Activi
IDC*
Issued for Inter Discipline Check
IFA* Issued for Review
IFU* Issued for Use
Data RDR
Collection / Review Design Requirements
IDH*Issued for Design (with holds)
IFD*
Issued for Design (without holds)
IFR*Issued for Customer Review
Activity
Name
FIRE WATER MAIN LOOP EXTENSION PID DRAWINGS MC
FIRE WATER MAIN LOOP EXTENSION PID DRAWINGS MP1
FIRE WATER MAIN LOOP EXTENSION PID DRAWINGS MP2
FIRE WATER MAIN LOOP EXTENSION PID DRAWINGS PORT
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS MAGASIN 0300 MC
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS MAGASIN 0918 MC
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS MAGASIN 0200 MC
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS MAGASIN CEM MC
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS MAGASIN CEM MP1
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS MAGASIN S0300 MP2
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE-"NC"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE-"MT32"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "MT311"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "HT 4L 314"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "MT MP2"
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "BT CENTRALE "
WATER FIRE SPRINKLER SYSTEM PID DRAWINGS - VIDE TECHNIQUE- "MT/BT SULFURIQUE & SULFACID "
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE MT NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE D'EXCITATION/PROTECTION-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE ONDULEUR PS3-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE DCS NC-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -SALLE EMS ET AIGUILLAGE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE HT AL-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -HT 4L 313-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -MT 32-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE MT 311-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE MT MP2-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE BT CENTRALE-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE PD1 MT/BT-
FK-5-1-12 FIRE SUPPRESSION SYSTEM PID DRAWINGS -POSTE CENTRALE BT-
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
20 3% 5-Aug-22 5-Aug-22
20 3% 5-Aug-22
20 3%
20 3%
20 3%
20 3%
20 3%
20 3%
20 3%
20 3%
20 3%
20 3%
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
20 3% 5-Aug-22
600 100.00%
600 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish
100%
100%
100%
100%
100%
100%
100%
100%
27%
26.67%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
CALCULATIONS 1,280 hrs
Name
Earned vs Panned
Discipline
Activity
Name
CALCULATION NOTE OF WATER MAIN LOOP & HYDRANT IMPLANTATION
POWER NEED CALCULATION -PUMPS ROOM-
FIRE DETECTION CALCULATION NOTE -MAGASIN CENTRAL 1-
FIRE DETECTION CALCULATION NOTE -MAGASIN CENTRAL 2-
FIRE DETECTION CALCULATION NOTE -MAGASIN CONTRÔLE BZ -
FIRE DETECTION CALCULATION NOTE - HANGAR DES PNEUS ET BANDES -
FIRE DETECTION CALCULATION NOTE -PUMPS ROOM-
FACP BATTERY CALCULATION NOTE -MAGASIN CENTRAL 1 / 2 / MAGASIN CONTRÔLE BZ
FACP BATTERY CALCULATION NOTE - HANGAR DES PNEUS ET BANDES -
FACP BATTERY CALCULATION NOTE -PUMPS ROOM-
VOLTAGE DROP CALCULATION -FIRE ALARM SYSTEM-
VOLTAGE DROP CALCULATION -FIRE PUMPS -
CALCULATION NOTE FIRE DETECTION -PUMPS ROOM -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 1-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 2-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CONTRÔLE BZ -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - HANGAR DES PNEUS ET BANDES -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -PUMPS ROOM-
CALCULATION NOTE VENTILATION - PUMPS ROOM-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM STATION GASOIL
CALCULATION NOTE OF WATER SPRINKLER SYSTEM ZONE STOCKAGE HUILES
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1A)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1B)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1C)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (P1D)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (PSF 1)"
CALCULATION NOTE GAZ SYSTEM DRAWINGS "salle electrique (PSF 2)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (PSF 3)"
CALCULATION NOTE OF GAZ SYSTEM DRAWINGS "salle electrique (PSF 4)"
CALCULATION NOTE OF FOAM DELUGE SYSTEM STATION GASOIL
CALCULATION NOTE OF FOAM DELUGE SYSTEM DRAWINGS CHARGEMENT TRAIN
PUMPS ROOM CIVIL CALCULATION
Requirements
SCHEDULE IFR
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
40 3% 5-Aug-22 5-Oct-22 5-Aug-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3% 5-Aug-22
40 3%
40 3% 5-Aug-22
1,280 100.00%
1,280 100.00%
RULES OF CREDIT
Basis of Design
ROC
Reports, Studies and Philosophy
ROC
Calculations and Analysis
ROC
Specifications and Data Sheets
ROC
Drawings subject to Inter Discipline Check
ROC
Drawings not subject to Inter Discipline Check
ROC
Drawings subject to HAZOP e.g. P&IDs
ROC
Engineering Requisitions
ROC
Technical Bid Evaluations
ROC
Engineering or Construction Work Packs
ROC
Other Generic Documents (subject to Customer Review)
ROC
Other Generic Documents (NOT subject to Customer Review)
ROC
Documents (Under Code 2 and Code 1 Approvals)
ROC
IFC CR IFD
Forecast / Actual Forecast / Actual Forecast / Actual
Start Finish Start Finish Start
S-CURVES
100%
Electrical – ENGINEERING S-CURVE
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
S-CURVE
IFP*
20%
IFP
15%
Status
Actual
50% 0%
50% In Progress
90% In Progress
90% In Progress
90% In Progress
90% In Progress
50% In Progress
90% In Progress
90% In Progress
90% In Progress
90% In Progress
50% In Progress
50% In Progress
90% In Progress
90% In Progress
90% In Progress
90% In Progress
50% In Progress
50% In Progress
50% In Progress
46%
46.25%
FF
Engineering Earned Value
Budget
DATA SHEETS 144 hrs
Name
Earned vs Panned
Discipline
Activity
Name
DATA SHEET- NOZZLE OF GAZ SYSTEM
DATA SHEET - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
DATA SHEET - COUPLING FOR GAS SYSTEM
DATA SHEET- DELUGE VALVE
DATA SHEET- BLADDER TANK
DATA SHEET- FOAM NOZZLE
DATA SHEET- FOAM CONCENTRATE
DATA SHEET - SPRAY NOZZLE
DATA SHEET- BUTERFLY VALVE
DATA SHEET-DRAIN TEST VALVES
DATA SHEET- FLOW SWITCH
DATA SHEET- ALARM CHECK VALVE
DATA SHEET- SPRINKLER HEAD
DATA SHEET-CHECK VALVE
DATA SHEET- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
DATA SHEET- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
DATA SHEET- COUPLING
DATA SHEET-RIA
DATA SHEET-PRESSUR REDUCING VALVE
DATA SHEET- ADDRESSABLE FIRE & GAS ALARM SYSTEM
DATA SHEET- ADRESSABLE SMOKE DETECTOR
DATA SHEET- LINEAR HEAT DETECTOR
DATA SHEET- INDUSTRIAL HEAT DETECTOR
DATA SHEET- FLAME DETECTOR
DATA SHEET- GAS DETECTOR
DATASHEET- SMOKE DETECTOR INTRINSICALLY SAFE
DATA SHEET- MULTI-CRITEREA DETECTOR
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
DATA SHEET -INDOOR ALARM
DATA SHEET -OUTDOOR ALARM
DATA SHEET - REMOTE INDICATOR
DATA SHEET -CABLE CR1
DATA SHEET- POWER SUPPLY
DATA SHEET -OUTPUTS MODULE
DATA SHEET -INPUTS MODULE
n Requirements
SCHEDULE IFR
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 31-Aug-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
144 100.00%
144 100.00%
RULES OF CREDIT
Basis of Design
ROC
Reports, Studies and Philosophy
ROC
Calculations and Analysis
ROC
Specifications and Data Sheets
ROC
Drawings subject to Inter Discipline Check
ROC
Drawings not subject to Inter Discipline Check
ROC
Drawings subject to HAZOP e.g. P&IDs
ROC
Engineering Requisitions
ROC
Technical Bid Evaluations
ROC
Engineering or Construction Work Packs
ROC
Other Generic Documents (subject to Customer Review)
ROC
Other Generic Documents (NOT subject to Customer Review)
ROC
Documents (Under Code 2 and Code 1 Approvals)
ROC
IFC CR IFD
Forecast / Actual Forecast / Actual Forecast / Actual
Start Finish Start Finish Start
S-CURVES
100%
Electrical – ENGINEERING S-CURVE
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
2022w16 2022w17 2022w18 2022w19
WO 04/22/22 04/29/22 05/06/22 05/13/22
Planned #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Actual
Forecast
STA IIR IDC* IFA* IFU*
1.1.01 5% 40% 15% 20% 20%
STA IIR IDC* IFA* IFU*
S-CURVE
IFP*
20%
IFP
15%
Status
Actual
80% 0%
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80% In Progress
80%
80.00%
FF
Engineering Earned Value
Budget
CALCULATIONS 148 hrs
Name
Earned vs Panned
Discipline Activi
IDC*
Issued for Inter Discipline Check
IFA* Issued for Review
IFU* Issued for Use
Data RDR
Collection / Review Design Requirements
IDH*Issued for Design (with holds)
Issued
IFD* for Design (without holds)
IFR*Issued for Customer Review
Activity
Name
FM- NOZZLE OF GAZ SYSTEM
FM - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
FM - COUPLING FOR GAS SYSTEM
FM- DELUGE VALVE
FM- BLADDER TANK
FM- FOAM NOZZLE
FM- FOAM CONCENTRATE
FM - SPRAY NOZZLE
FM- BUTERFLY VALVE
FM-DRAIN TEST VALVES
FM- FLOW SWITCH
FM- ALARM CHECK VALVE
FM- SPRINKLER HEAD
FM-CHECK VALVE
FM- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
FM- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
FM- COUPLING
NF-RIA
FM-PRESSUR REDUCING VALVE
FM- ADDRESSABLE FIRE & GAS ALARM SYSTEM
FM- ADRESSABLE SMOKE DETECTOR
FM- LINEAR HEAT DETECTOR
FM- INDUSTRIAL HEAT DETECTOR
FM- FLAME DETECTOR
FM- GAS DETECTOR
FM- SMOKE DETECTOR INTRINSICALLY SAFE
FM- MULTI-CRITEREA DETECTOR
FM -MANUAL ALARM CALL POINT DUAL ACTION
FM -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
FM -MANUAL ABORT STATION
FM -INDOOR ALARM
FM -OUTDOOR ALARM
FM - REMOTE INDICATOR
CABLE CR1
FM-OUTPUTS MODULE
FM -INPUTS MODULE
FM- POWER SUPPLY
n Requirements
SCHEDULE IFR
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
4 3% 5-Aug-22 5-Oct-22 5-Aug-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
148 100.00%
148 100.00%
RULES OF CREDIT
Basis of Design
ROC
Reports, Studies and Philosophy
ROC
Calculations and Analysis
ROC
Specifications and Data Sheets
ROC
Drawings subject to Inter Discipline Check
ROC
Drawings not subject to Inter Discipline Check
ROC
Drawings subject to HAZOP e.g. P&IDs
ROC
Engineering Requisitions
ROC
Technical Bid Evaluations
ROC
Engineering or Construction Work Packs
ROC
Other Generic Documents (subject to Customer Review)
ROC
Other Generic Documents (NOT subject to Customer Review)
ROC
Documents (Under Code 2 and Code 1 Approvals)
ROC
IFC CR IFD
Forecast / Actual Forecast / Actual Forecast / Actual
Start Finish Start Finish Start
S-CURVES
100%
Electrical – ENGINEERING S-CURVE
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
2022w16 2022w17 2022w18 2022w19
WO 04/22/22 04/29/22 05/06/22 05/13/22
Planned #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Actual
Forecast
STA IIR IDC* IFA* IFU*
1.1.01 5% 40% 15% 20% 20%
STA IIR IDC* IFA* IFU*
S-CURVE
IFP*
20%
IFP
15%
Status
Actual
0%
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
Not started
0%
0.00%
FF
Engineering Earned Value
Budget
MANUALS 100 hrs
Name
Earned vs Panned
Discipline Activ
Activity
Name
PRE-COMMISSIONING AND COMMISSIONING MANUAL
OPERATION AND MAINTENANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
er Discipline Check
n / Review Design Requirements
sign (with holds)
sign (without holds)
tomer Review
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
100 100.00%
100 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
0%
0%
0%
0%
0%
0.00%
S-CURVES
Electrical – ENGINEERING S-CURVE
Planned
Budget
CALCULATIONS 350 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
HYDROSTATIC & PNEUMATIC TEST PROCEDURE
FLUSHING TEST PROCEDURE
FIRE DETECTION SYSTEM TEST PROCEDURE
FIRE EXTINGUISHING SYSTEM (SPRINKLER ) TEST PROCEDURE
SAT TEST PROCEDURES -FIRE DETECTION & ALARM SYSTEM
SAT TEST REPORT - FIRE WATER SYSTEMS
SAT TEST REPORT -FIRE DETECTION & ALARM SYSTEM
ITP FOR FIRE SUPRESSION SYSTEMS
ITP FOR FIRE DETECTION & ALARM SYSTEM
QUALITY ASSURANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
TEST AND COMMISSIONING PROCEDURES / CHACK LISTS PER SYSTEM
ITP FOR FIRE DETECTION & ALARM SYSTEM
er Discipline Check
350 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
Entité Discipline
GENERAL
MAGASIN CENTRAL 1
MAGASIN CONTROL BY
MAGASIN TRATEMENT
MAGASIN DECOUVERTE
RESEAU INCENDIE
RESEAU INCENDIE
MAGASIN CENTRAL 1
MAGASIN CONTROL BY
MAGASIN TRATEMENT
MAGASIN DECOUVERTE
RESEAU INCENDIE
RESEAU INCENDIE
MAGASIN CENTRAL 1
MAGASIN CONTROL BY
MAGASIN TRATEMENT
MAGASIN DECOUVERTE
RESEAU INCENDIE
RESEAU INCENDIE
MAGASIN CENTRAL 1
MAGASIN CONTROL BY
MAGASIN TRATEMENT
MAGASIN DECOUVERTE
RESEAU INCENDIE
RESEAU INCENDIE
GENERAL
RESEAU INCENDIE
RESEAU INCENDIE
GENERAL
GENERAL
MAGASIN CENTRAL 1
MAGASIN CONTROL BY
MAGASIN TRAITEMENT
MAGASIN DECOUVERT
RESEAU INCENDIE
RESEAU INCENDIE
RESEAU INCENDIE
RESEAU INCENDIE
RESEAU INCENDIE
RESEAU INCENDIE
GENERAL
RESEAU INCENDIE
RESEAU INCENDIE
MAGASIN CENTRAL 1
MAGASIN CONTRÔLE BY
MAGASIN TRAITEMENT
MAGASIN DECOUVERT
RESEAU INCENDIE
RESEAU INCENDIE
GENERAL
MAGASIN CENTRAL 1
MAGASIN CONTROL BY
MAGASIN TRAITEMENT
MAGASIN DECOUVERT
RESEAU INCENDIE
RESEAU INCENDIE
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
SALLE ELECTRIQUE UC3
SALLE ELECTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
FOYER TURBINE UC2
CEINTURE UC2
F101 UC2
F101 UC3
F101 UC4
SALLE ECELCTRIQUE UC3
SALLE ECELCTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
FOYER TURBINE UC2
CEINTURE UC2
F101 UC2
F101 UC3
F101 UC4
SALLE ECELCTRIQUE UC3
SALLE ECELCTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
FOYER TURBINE UC2
CEINTURE UC2
F101 UC2
F101 UC3
F101 UC4
SALLE ECELCTRIQUE UC3
SALLE ECELCTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
FOYER TURBINE UC2
CEINTURE UC2
F101 UC2
F101 UC3
F101 UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
FOYER TURBINE UC2
F101 UC2
F101 UC3
F101 UC4
Poste électrique salle BT*
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
SALLE ELECTRIQUE UC3
SALLE ELECTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
FOYER TURBINE UC2
CEINTURE UC2
F101 UC2
F101 UC3
F101 UC4
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
SALLE ELECTRIQUE UC3
SALLE ELECTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
FOYER TURBINE UC2
CEINTURE UC2
F101 UC2
F101 UC3
F101 UC4
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
BAC STOCKAGE GAZOLINE & CUVETTE DE RETENTION
SALLE ELECTRIQUE UC3
SALLE ELECTRIQUE UC4
POSTE A
POSTE B
POSTE CLAIRE
POSTE DELATER
Postes électriques
PEL2 et PEL3
SALLE BT D2/D1
Convoyeur CL2
Roue pelle liaison Mzinda
Roue pelle RP4
Roue pelle RP2
Stackers A et B
Tours de liaison MZINDA
Dépotage ,stockage et circuit Fuel et gazoline
Postes de détente gaz et circuit gaz
Stock mécanise
Salles des Machines
Postes électrique MT
Postes électrique BT
Postes des transformateurs
Stockeuse
Roue pelle
Salles de contrôle
Bâtiment compresseurs
Convoyeurs & Tours de Transfert
Local des pompes incendie
Nouveaux projet 3MT ( CV2/hangar/ CVs en élévation)
Postes électriques MT
Postes électriques BT
Poste de transformation MT/BT
Façade des Fours
Poste de détente GAZ
Circuit GAZ
Dépotage, stockage et transfert Fuel & Gazoline
Convoyeurs T23&T23bis, T12&T12bis, et Extracteurs de fours
Stockeuse
Roue pelle
Local des pompes incendie
Bâtiment compresseurs
Local Batteries/ Chargeurs batterie
Postes électriques (BT, MT contrôle commande)
Poste de transformation MT/BT
Local des batteries*
Engins (Bulls D11,Sondeuses...)
Station Gasoil
Station de service*
Stockeuses
Convoyeur de mise en stock
Installations fixes*
Ateliers de maintenance*
Postes électriques (BT, MT contrôle commande)*
Poste de transformation MT/BT
Poste transformateur 60 KVA*
Local des batteries*
Engins (Bulls D11,Sondeuses...)
Station Gasoil
Station service
Stockeuses
Rouepelles*
Convoyeur de mise en stock
Installation fixes*
STEP POSTE ELECTRIQUES
POSTE 60KV SOUS STATION
POSTE 60KV CALCINATION
POSTE 60KV SECHAGE
POSTE 60KV M'ZINDA
POSTE 60KV BOUCHANE
POSTE 60KV RECETTE 9
POSTE 60KV RECETTE 3
POSTE 60KV STEP
POSTE 60KV BAHIRA
SITUATI
WBS4
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
GENERAL
SITUATION D'AVANCE
Entité
CALCULATIONS
CERTIFICATION
DATA SHEETS
ELECTRICAL
FIRE PROTECTION ISOMETRIC DRAWI
FIRE PROTECTION P&ID DRAWINGS
FIRE PROTECTION SYSTEM
MANUALS
PROCEDURES
Activity Name
AVANCEMENT REEL
2,370.00 100.00% 5%
Priorité
Heures Poids STA
0 25 1.05% 100%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05% 100%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05%
0 25 1.05% 100%
0 25 1.05%
0 60 2.53%
0 30 1.27%
0 25 1.05%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 60 2.53%
0 60 2.53%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 40 1.69%
0 80 3.38%
0 40 1.69%
0 40 1.69%
0 40 1.69% 100%
0 40 1.69%
0 35 1.48%
0 35 1.48%
0 40 1.69% 100%
0 20 0.84%
0 20 0.84%
0 20 0.84%
0 20 0.84%
0 20 0.84%
0 20 0.84%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 100%
0 4 0.17% 41%
0 4 0.17% 0%
0 4 0.17% 41%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 4 0.17% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 2022w22
0 25 1.05% 4471500%
0 25 1.05% #DIV/0!
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 25 1.05% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 40 1.69% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 35 1.48% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 20 0.84% 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
0 0%
EL Avancement Global par Discipline
S18 Cumulés
30.71% 30.71% CALCULATIONS
#DIV/0! #DIV/0! CERTIFICATION
#DIV/0! #DIV/0! DATA SHEETS
6.25% 6.25% ELECTRICAL
8.39% 8.39% FIRE PROTECTION ISOMETRIC D
16.25% 16.25% FIRE PROTECTION P&ID DRAWIN
0.00% 0.00% FIRE PROTECTION SYSTEM
#DIV/0! #DIV/0! MANUALS
#DIV/0! #DIV/0! PROCEDURES
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
100% 100% 0% 0% 65.0%
41% 41% 3% 0% 26.9%
0% 0% 0% 0% 0.0%
41% 41% 3% 0% 26.9%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
2022w23 2022w24 0% 0% 0.0%
4471600% 4471700% 0% 0% 2906555.0%
0% 0% 0% 0% #DIV/0!
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
0% 0% 0% 0% 0.0%
Global par Discipline
Avancement
7.26%
0.00%
0.00%
2.06%
1.10%
1.10%
0.00%
0.00%
0.00%
11.51%
0.69% 16.25
0.69% 16.25
0.69% 16.25
1.10% 26.00
1.10% 26.00
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.11% 2.60
0.05% 1.08
0.00% -
0.05% 1.08
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
30659.86% 726,638.75
#DIV/0! #DIV/0!
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
0.00% -
FF
Engineering Earned Value
Budget
ELECTRICAL 740 hrs
Name
Earned vs Panned
Discipline Activi
IDC*
Issued for Inter Discipline Check
IFA* Issued for Review
IFU* Issued for Use
Data RDR
Collection / Review Design Requirements
IDH*Issued for Design (with holds)
Issued for Design (without holds)
IFD*
IFR*Issued for Customer Review
Activity
Name
GENERAL FIRE ALARM ARCHITECTURALE
FIRE ALAM ARCHITECTURAL PANEL -MAGASIN CENTRAL 1 -
FIRE ALAM ARCHITECTURAL PANEL -MAGASIN CONTRÔLE BY -
FIRE ALAM ARCHITECTURAL PANEL -MAGASIN TRAITEMENT -
FIRE ALAM ARCHITECTURAL PANEL - MAGASIN DECOUVERTE -
FIRE ALAM ARCHITECTURAL PANEL -PUMPS ROOM-
ALARM GAZ ARCHITECTURAL PANEL - LOCAL GAS -
FIRE ALARM DETECTION DRAWING -MAGASIN CENTRAL 1-
FIRE ALARM DETECTION DRAWING - MAGASIN CONTRÔLE BY -
FIRE ALARM DETECTION DRAWING - MAGASIN TRAITEMENT -
FIRE ALARM DETECTION DRAWING - MAGASIN DECOUVERTE -
FIRE ALARM DETECTION DRAWING -PUMPS ROOM-
ALARM GAZ DRAWING - LOCAL GAS -
CAUSE & EFFECT DIAGRAM -MAGASIN CENTRAL 1-
CAUSE & EFFECT DIAGRAM - MAGASIN CONTRÔLE BY-
CAUSE & EFFECT DIAGRAM - MAGASIN TRAITEMENT-
CAUSE & EFFECT DIAGRAM - MAGASIN DECOUVERTE-
CAUSE & EFFECT DIAGRAM -PUMPS ROOM-
CAUSE & EFFECT DIAGRAM - LOCAL GAS -
FACP WIRING DIAGRAM -MAGASIN CENTRAL 1-
FACP WIRING DIAGRAM -MAGASIN CONTRÔLE BY -
FACP WIRING DIAGRAM - MAGASIN TRAITEMENT-
FACP WIRING DIAGRAM - MAGASIN DECOUVERTE-
FACP WIRING DIAGRAM -PUMPS ROOM-
FACP WIRING DIAGRAM GAS - LOCAL GAS -
INTERNAL WIRING DIAGRAMS (PANEL/EQUIPMENT)
ELECTRICAL SINGLE LINE DIAGRAMS -PUMPS ROOM-
ELECTRICAL DRAWINGS -PUMPS ROOM
AS BUILD DRAWINGS .
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
25 3% 5-Aug-22 5-Oct-22 5-Aug-22
25 1% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 5% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
60 8% 5-Aug-22 5-Oct-22
30 4% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
0% 5-Aug-22 5-Oct-22
740 99.02%
740 99.02%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
99%
99.02%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
FIRE PROTECTION SYS 560 hrs
Name
Earned vs Panned
Discipline
Activity
Name
FIRE WATER MAIN LOOP & HYDRANT IMPLANTATION DRAWING
WATER FIRE SPRINKLER SYSTEM DRAWINGS -MAGASIN CENTRAL 1-
WATER FIRE SPRINKLER SYSTEM DRAWINGS -MAGASIN CONTRÔLE BY-
WATER FIRE SPRINKLER SYSTEM DRAWINGS -MAGASIN TRAITEMENT -
WATER FIRE SPRINKLER SYSTEM DRAWINGS -MAGASIN DECOUVERTE -
WATER FIRE SPRINKLER SYSTEM DRAWINGS -PUMPS ROOM-
FIRE PUMPS ROOM DRAWING -PIPING-
CIVIL DRAWINGS -PUMPS ROOM-
CIVIL DRAWINGS -FIRE STORAGE TANK-
MOUNTING DIAGRAM -TANK STORAGE-
VENTILATION DRAWING -PUMPS ROOM-
AS BUILD DRAWINGS
FIRE HOSE REEL (RIA) DRAWIN
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
40 7% 5-Aug-22 5-Oct-22 5-Aug-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
60 11% 5-Aug-22 5-Oct-22
60 11% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
40 7% 5-Aug-22 5-Oct-22
560 100.00%
560 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
FIRE PROTECTI 310 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
FIRE WATER MAIN LOOP & HYDRANT IMPLANTATION ISOMETRIC DRAWING
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 1-
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM -MAGASIN CONTRÔLE BY-
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM -MAGASIN TRAITEMENT -
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM - MAGASIN DECOUVERTE -
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM -PUMPS ROOM-
FIRE HOSE REEL (RIA) DRAWING1
er Discipline Check
310 100.00%
S-C
11-Jan-00
Electrical – ENG
9-Jan-00
7-Jan-00
5-Jan-00
3-Jan-00
1-Jan-00
30-Dec-99
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 08/05/22
Planned 5-Aug-22
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
Budget
FIRE PROTECTI 160 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
WATER MAIN LOOP & HYDRANT IMPLANTATION P&ID’s DRAWING
P&ID’s F WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 1-
P&ID’s F WATER SPRINKLER SYSTEM -MAGASIN CONTRÔLE BY-
P&ID’s WATER SPRINKLER SYSTEM -MAGASIN TRAITEMENT -
P&ID’s WATER SPRINKLER SYSTEM - MAGASIN DECOUVERTE -
P&ID’s WATER SPRINKLER SYSTEM -PUMPS ROOM-
FIRE HOSE REEL (RIA) P&ID’s DRAWING
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
40 25% 5-Aug-22 5-Oct-22 5-Aug-22
20 13% 5-Aug-22 5-Oct-22
20 13% 5-Aug-22 5-Oct-22
20 13% 5-Aug-22 5-Oct-22
20 13% 5-Aug-22 5-Oct-22
20 13% 5-Aug-22 5-Oct-22
20 13% 5-Aug-22 5-Oct-22
160 100.00%
160 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
Budget
CALCULATIONS 760 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
CALCULATION NOTE OF WATER MAIN LOOP & HYDRANT IMPLANTATION
POWER NEED CALCULATION -PUMPS ROOM-
FIRE DETECTION CALCULATION NOTE -MAGASIN CENTRAL 1-
FIRE DETECTION CALCULATION NOTE -MAGASIN CONTRÔLE BY -
FIRE DETECTION CALCULATION NOTE -MAGASIN DECOUVERTE -
FIRE DETECTION CALCULATION NOTE -PUMPS ROOM-
VOLTAGE DROP CALCULATION -FIRE PUMPS -
FACP BATTERY CALCULATION NOTE -PUMPS ROOM -
FACP BATTERY CALCULATION NOTE -MAGASIN CENTRAL 1 -
FACP BATTERY CALCULATION NOTE -MAGASIN CONTRÔLE BY-
FACP BATTERY CALCULATION NOTE -MAGASIN TRAITEMENT -
FACP BATTERY CALCULATION NOTE - MAGASIN DECOUVERTE -
CALCULATION NOTE FIRE DETECTION -PUMPS ROOM -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CENTRAL 1-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN CONTRÔLE BY-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -MAGASIN TRAITEMENT -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - MAGASIN DECOUVERTE -
CALCULATION NOTE OF WATER SPRINKLER SYSTEM -PUMPS ROOM-
CALCULATION NOTE VENTILATION - PUMPS ROOM-
er Discipline Check
760 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
DATA SHEETS 144 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
DATA SHEET- NOZZLE OF GAZ SYSTEM
DATA SHEET - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
DATA SHEET - COUPLING FOR GAS SYSTEM
DATA SHEET- DELUGE VALVE
DATA SHEET- BLADDER TANK
DATA SHEET- FOAM NOZZLE
DATA SHEET- FOAM CONCENTRATE
DATA SHEET - SPRAY NOZZLE
DATA SHEET- BUTERFLY VALVE
DATA SHEET-DRAIN TEST VALVES
DATA SHEET- FLOW SWITCH
DATA SHEET- ALARM CHECK VALVE
DATA SHEET- SPRINKLER HEAD
DATA SHEET-CHECK VALVE
DATA SHEET- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
DATA SHEET- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
DATA SHEET- COUPLING
DATA SHEET-RIA
DATA SHEET-PRESSUR REDUCING VALVE
DATA SHEET- ADDRESSABLE FIRE & GAS ALARM SYSTEM
DATA SHEET- ADRESSABLE SMOKE DETECTOR
DATA SHEET- LINEAR HEAT DETECTOR
DATA SHEET- INDUSTRIAL HEAT DETECTOR
DATA SHEET- FLAME DETECTOR
DATA SHEET- GAS DETECTOR
DATASHEET- SMOKE DETECTOR INTRINSICALLY SAFE
DATA SHEET- MULTI-CRITEREA DETECTOR
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
DATA SHEET -INDOOR ALARM
DATA SHEET -OUTDOOR ALARM
DATA SHEET - REMOTE INDICATOR
DATA SHEET -CABLE CR1
DATA SHEET- POWER SUPPLY
DATA SHEET -OUTPUTS MODULE
DATA SHEET -INPUTS MODULE
er Discipline Check
144 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w17 2022w18 2022w19 2022w20 202022w22
04/29/22 05/06/22 05/13/22 05/20/22 ### 06/03/22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #DIV/0!
IIR IDC* IFA* IFU*
40% 15% 20% 20%
IIR IDC* IFA* IFU*
Budget
CALCULATIONS 148 hrs
Name
Earned vs Panned
Discipline
Activity
Name
FM- NOZZLE OF GAZ SYSTEM
FM - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
FM - COUPLING FOR GAS SYSTEM
FM- DELUGE VALVE
FM- BLADDER TANK
FM- FOAM NOZZLE
FM- FOAM CONCENTRATE
FM - SPRAY NOZZLE
FM- BUTERFLY VALVE
FM-DRAIN TEST VALVES
FM- FLOW SWITCH
FM- ALARM CHECK VALVE
FM- SPRINKLER HEAD
FM-CHECK VALVE
FM- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
FM- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
FM- COUPLING
NF-RIA
FM-PRESSUR REDUCING VALVE
FM- ADDRESSABLE FIRE & GAS ALARM SYSTEM
FM- ADRESSABLE SMOKE DETECTOR
FM- LINEAR HEAT DETECTOR
FM- INDUSTRIAL HEAT DETECTOR
FM- FLAME DETECTOR
FM- GAS DETECTOR
FM- SMOKE DETECTOR INTRINSICALLY SAFE
FM- MULTI-CRITEREA DETECTOR
FM -MANUAL ALARM CALL POINT DUAL ACTION
FM -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
FM -MANUAL ABORT STATION
FM -INDOOR ALARM
FM -OUTDOOR ALARM
FM - REMOTE INDICATOR
CABLE CR1
FM-OUTPUTS MODULE
FM -INPUTS MODULE
FM- POWER SUPPLY
er Discipline Check
148 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w17 2022w18 2022w19 2022w20 202022w22
04/29/22 05/06/22 05/13/22 05/20/22 ### 06/03/22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #DIV/0!
IIR IDC* IFA* IFU*
40% 15% 20% 20%
IIR IDC* IFA* IFU*
Budget
MANUALS 100 hrs
Name
Earned vs Panned
Discipline Activi
IDC*
Issued for Inter Discipline Check
IFA* Issued for Review
IFU* Issued for Use
Data RDR
Collection / Review Design Requirements
IDH*Issued for Design (with holds)
Issued for Design (without holds)
IFD*
IFR*Issued for Customer Review
Activity
Name
PRE-COMMISSIONING AND COMMISSIONING MANUAL
OPERATION AND MAINTENANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
100 100.00%
100 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
0%
0%
0%
0%
0%
0.00%
S-CURVES
Electrical – ENGINEERING S-CURVE
Planned
Budget
CALCULATIONS #REF!
Name
Earned vs Panned
Discipline Activi
Activity
Name
HYDROSTATIC & PNEUMATIC TEST PROCEDURE
FLUSHING TEST PROCEDURE
FIRE DETECTION SYSTEM TEST PROCEDURE
FIRE EXTINGUISHING SYSTEM (SPRINKLER ) TEST PROCEDURE
SAT TEST PROCEDURES -FIRE DETECTION & ALARM SYSTEM
SAT TEST REPORT - FIRE WATER SYSTEMS
SAT TEST REPORT -FIRE DETECTION & ALARM SYSTEM
ITP FOR FIRE SUPRESSION SYSTEMS
ITP FOR FIRE DETECTION & ALARM SYSTEM
QUALITY ASSURANCE MANUAL
CONFIGURATION AND PROGRAMMING
FORMATION AND TRAINING
TEST AND COMMISSIONING PROCEDURES / CHACK LISTS PER SYSTEM
er Discipline Check
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #REF!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
Specifications and Data Sheets STA
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
#REF!
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
ELECTRICAL 1,200 hrs
Name
Earned vs Panned
Discipline Activi
IDC*
Issued for Inter Discipline Check
IFA* Issued for Review
Activity
Name
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE ELECTRIQUE UC3-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -SALLE ELECTRIQUE UC4-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE A-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE B-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE CLAIRE-
FIRE ALAM ARCHITECTURAL RELAESE PANEL FK-5-1-12 FIRE SUPPRRESSION SYSTEM -POSTE DELATER-
FIRE ALAM ARCHITECTURAL RELAESE PANE -BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
FIRE ALAM ARCHITECTURAL RELAESE PANE -"FOYER TURBINE UC2 "
FIRE ALAM ARCHITECTURAL RELAESE PANEL - "CEINTURE UC2 "
FIRE ALAM ARCHITECTURAL RELAESE PANEL "F101 UC2 "
FIRE ALAM ARCHITECTURAL RELAESE PANEL "F101 UC3 "
FIRE ALAM ARCHITECTURAL RELAESE PANEL "F101 UC4 "
FIRE ALARM DETECTION DRAWING -SALLE ELECTRIQUE UC3-
FIRE ALARM DETECTION DRAWING -SALLE ELECTRIQUE UC4-
FIRE ALARM DETECTION DRAWING -POSTE A-
FIRE ALARM DETECTION DRAWING -POSTE B-
FIRE ALARM DETECTION DRAWING -POSTE CLAIRE-
FIRE ALARM DETECTION DRAWING-POSTE DELATER-
FIRE ALARM DETECTION DRAWING -BAC DE STOCKAGE GAZOLINE & CUVETTE DE RETENTION -
FIRE ALARM DETECTION DRAWING -"FOYER TURBINE UC2 "
FIRE ALARM DETECTION DRAWING - "CEINTURE UC2 "
FIRE ALARM DETECTION DRAWING - "F101 UC2 "
FIRE ALARM DETECTION DRAWING - "F101 UC3 "
FIRE ALARM DETECTION DRAWING-"F101 UC4 "
CAUSE & EFFECT DIAGRAM- SALLE ELECTRIQUE UC3-
CAUSE & EFFECT DIAGRAM--SALLE ELECTRIQUE UC4-
CAUSE & EFFECT DIAGRAM -POSTE A-
CAUSE & EFFECT DIAGRAM -POSTE B-
CAUSE & EFFECT DIAGRAM-POSTE DELATER-
CAUSE & EFFECT DIAGRAM --POSTE CLAIRE-
CAUSE & EFFECT DIAGRAM- BAC DE STOCKAGE GAZOLINE & CUVETTE DE RETENTION -
CAUSE & EFFECT DIAGRAM--"FOYER TURBINE UC2 "
CAUSE & EFFECT DIAGRAM "CEINTURE UC2 "
CAUSE & EFFECT DIAGRAM - "F101 UC3 "
CAUSE & EFFECT DIAGRAM-"F101 UC4 "
CAUSE & EFFECT DIAGRAM -"F101 UC2 "
FACP WIRING DIAGRAM-SALLE ELECTRIQUE UC3-
FACP WIRING DIAGRAM- -SALLE ELECTRIQUE UC4-
FACP WIRING DIAGRAM- -POSTE A-
FACP WIRING DIAGRAM- -POSTE B-
FACP WIRING DIAGRAM- -POSTE CLAIRE-
FACP WIRING DIAGRAM--POSTE DELATER-
FACP WIRING DIAGRAM--BAC DE STOCKAGE GAZOLINE & CUVETTE DE RETENTION -
FACP WIRING DIAGRAM--"FOYER TURBINE UC2 "
FACP WIRING DIAGRAM- - "CEINTURE UC2 "
FACP WIRING DIAGRAM- "F101 UC2 "
FACP WIRING DIAGRAM- "F101 UC3 "
FACP WIRING DIAGRAM- "F101 UC4 "
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
25 3% 5-Aug-22 5-Oct-22 5-Aug-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
25 3% 5-Aug-22 5-Oct-22
1,200 160.00%
1,200 160.00%
S-C
Electrical – ENG
100%
90%
80%
70%
60%
50%
40%
30%
20%
Electrical – ENG
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
160%
160.00%
S-CURVES
Planned
Budget
FIRE PROTECTION SYS 680 hrs
Name
Earned vs Panned
Discipline
Activity
Name
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"POSTE A"
WATER FIRE SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"POSTE B"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "POSTE CLAIRE"
WATER FIRE SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "POSTE DELATER"
FOAM FIRE PROTECTION SYSTEM DRAWINGS "FOYER TURBINE UC2 "
FOAM FIRE PROTECTION SYSTEM DRAWINGS "CEINTURE UC2 "
FOAM FIRE PROTECTION SYSTEM DRAWINGS "F101 UC2 "
FOAM FIRE PROTECTION SYSTEM DRAWINGS "F101 UC3 "
FOAM FIRE PROTECTION SYSTEM DRAWINGS "F101 UC4 "
WATER FIRE DELUGE SYSTEM DRAWINGS- BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
FOAM FIRE PROTECTION SYSTEM DRAWINGS- BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
GAZ FIRE PROTECTION SYSTEM DRAWINGS "salle electrique UC3"
GAZ FIRE PROTECTION SYSTEM DRAWINGS "salle electrique UC4"
GAZ FIRE PROTECTION SYSTEM DRAWINGS "Poste électrique MT/BT : A"
GAZ FIRE PROTECTION SYSTEM DRAWINGS "Poste électrique MT/BT : B"
GAZ FIRE PROTECTION SYSTEM DRAWINGS "Poste électrique MT/BT : CLAIRE"
GAZ FIRE PROTECTION SYSTEM DRAWINGS"Poste électrique MT/BT : DELATER"
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
40 6% 5-Aug-22 5-Oct-22 5-Aug-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
40 6% 5-Aug-22 5-Oct-22
680 100.00%
680 100.00%
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%
FF
Engineering Earned Value
Budget
FIRE PROTECTION ISOMETRIC D 595 hrs
Name
Earned vs Panned
Discipline
Activity
Name
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM- VIDE TECHNIQUE-"POSTE A"
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM- VIDE TECHNIQUE-"POSTE B"
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM - VIDE TECHNIQUE- "POSTE CLAIRE"
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM - VIDE TECHNIQUE- "POSTE DELATER"
FIRE PROTECTION ISOMETRIC OF FOAM DELUGE SYSTEM "FOYER TURBINE UC2 "
FIRE PROTECTION ISOMETRIC OF FOAM DELUGE SYSTEM "CEINTURE UC2 "
FIRE PROTECTION ISOMETRIC OF FOAM DELUGE SYSTEM "F101 UC2 "
FIRE PROTECTION ISOMETRIC OF FOAM DELUGE SYSTEM "F101 UC3 "
FIRE PROTECTION ISOMETRIC OF FOAM DELUGE SYSTEM "F101 UC4 "
FIRE PROTECTION ISOMETRIC OF FOAM DELUGE SYSTEM - BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
FIRE PROTECTION ISOMETRIC OF WATER SPRINKLER SYSTEM - BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
FIRE PROTECTION ISOMETRIC OF GAS SYSTEM "salle electrique UC3"
FIRE PROTECTION ISOMETRIC OF GAS SYSTEM "salle electrique UC4"
FIRE PROTECTION ISOMETRIC OF GAS SYSTEM"Poste électrique MT/BT : A"
FIRE PROTECTION ISOMETRIC OF GAS SYSTEM "Poste électrique MT/BT : B"
FIRE PROTECTION ISOMETRIC OF GAS SYSTEM "Poste électrique MT/BT : CLAIRE"
FIRE PROTECTION ISOMETRIC OF GAS SYSTEM "Poste électrique MT/BT : DELATER"
er Discipline Check
stomer Review
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
35 6% 5-Aug-22 5-Oct-22 5-Aug-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
35 6% 5-Aug-22 5-Oct-22
595 100.00%
595 100.00%
S-C
Electrical – ENG
11-Jan-00
9-Jan-00
7-Jan-00
5-Jan-00
3-Jan-00
1-Jan-00
30-Dec-99
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 08/05/22
Planned 5-Aug-22
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
2022w23 2022w24
08/12/22 08/13/22
0% 0%
FF
Engineering Earned Value
Budget
FIRE PROTECTION ISOMETRIC DR 340 hrs
Name
Earned vs Panned
Discipline
Activity
Name
P&ID’s WATER SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"POSTE A"
P&ID’s WATER SPRINKLER SYSTEM DRAWINGS- VIDE TECHNIQUE-"POSTE B"
P&ID’s WATER SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "POSTE CLAIRE"
P&ID’s WATER SPRINKLER SYSTEM DRAWINGS - VIDE TECHNIQUE- "POSTE DELATER"
P&ID’s FOAM SYSTEM DRAWINGS "FOYER TURBINE UC2 "
P&ID’s FOAM SYSTEM DRAWINGS "CEINTURE UC2 "
P&ID’s FOAM SYSTEM DRAWINGS "F101 UC2 "
P&ID’s FOAM SYSTEM DRAWINGS "F101 UC3 "
P&ID’s FOAM SYSTEM DRAWINGS "F101 UC4 "
P&ID’s FOAM SYSTEM DRAWINGS - BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
P&ID’s WATER SPRINKLER SYSTEM DRAWINGS - BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
P&ID’s GAZ SYSTEM of "salle electrique UC3"
P&ID’s GAZ SYSTEM of "salle electrique UC4"
P&ID’s GAZ SYSTEM of "Poste électrique MT/BT : A"
P&ID’s GAZ SYSTEM of "Poste électrique MT/BT : B"
P&ID’s GAZ SYSTEM of "Poste électrique MT/BT : CLAIRE"
P&ID’s GAZ SYSTEM of "Poste électrique MT/BT : DELATER"
er Discipline Check
stomer Review
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
20 6% 5-Aug-22 5-Oct-22 5-Aug-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
20 6% 5-Aug-22 5-Oct-22
340 100.00%
340 100.00%
S-C
Electrical – ENG
11-Jan-00
9-Jan-00
7-Jan-00
5-Jan-00
3-Jan-00
1-Jan-00
30-Dec-99
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 08/05/22
Planned 5-Aug-22
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
/22 05/04/22 05/11/22 05/18/22 05/25/22 06/01/22 06/08/22 06/15/22 06/22/22 06/29/22
Planned
2022w23 2022w24
08/12/22 08/13/22
0% 0%
FF
Engineering Earned Value
Budget
CALCULATIONS 1,400 hrs
Name
Earned vs Panned
Discipline
Activity
Name
FIRE DETECTION CALCULATION NOTE -SALLE ELECTRIQUE UC3-
FIRE DETECTION CALCULATION NOTE -SALLE ELECTRIQUE UC4-
FIRE DETECTION CALCULATION NOTE -POSTE A-
FIRE DETECTION CALCULATION NOTE -POSTE B-
FIRE DETECTION CALCULATION NOTE -POSTE CLAIRE-
FIRE DETECTION CALCULATION NOTE -POSTE DELATER-
FACP BATTERY CALCULATION NOTE -SALLE ELECTRIQUE UC3-
FACP BATTERY CALCULATION NOTE -SALLE ELECTRIQUE UC4-
FACP BATTERY CALCULATION NOTE -POSTE A-
FACP BATTERY CALCULATION NOTE -POSTE B-
FACP BATTERY CALCULATION NOTE -POSTE CLAIRE-
FACP BATTERY CALCULATION NOTE -POSTE DELATER-
FACP BATTERY CALCULATION NOTE -BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
FACP BATTERY CALCULATION NOTE -"FOYER TURBINE UC2 "
FACP BATTERY CALCULATION NOTE - "CEINTURE UC2 "
FACP BATTERY CALCULATION NOTE "F101 UC2 "
FACP BATTERY CALCULATION NOTE "F101 UC3 "
FACP BATTERY CALCULATION NOTE "F101 UC4 "
CALCULATION NOTE OF GAS SYSTEM -SALLE ELECTRIQUE UC3-
CALCULATION NOTE OF GAS SYSTEM -SALLE ELECTRIQUE UC4-
CALCULATION NOTE OF GAS SYSTEM -POSTE A-
CALCULATION NOTE OF GAS SYSTEM -POSTE B-
CALCULATION NOTE OF GAS SYSTEM -POSTE CLAIRE-
CALCULATION NOTE OF GAS SYSTEM -POSTE DELATER-
CALCULATION NOTE OF GAS SYSTEM - BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - BAC SE STOCKAGE GAZOLINE& CUVETTE DE RETENTION-
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - VIDE TECHNIQUE-"POSTE A"
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - VIDE TECHNIQUE-"POSTE B"
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - VIDE TECHNIQUE-"POSTECLAIRE"
CALCULATION NOTE OF WATER SPRINKLER SYSTEM - VIDE TECHNIQUE-"POSTE DELATER"
CALCULATION NOTE OF FOAM SYSTEM "FOYER TURBINE UC2 "
CALCULATION NOTE OF FOAM SYSTEM "CEINTURE UC2 "
CALCULATION NOTE OF FOAM SYSTEM "F101 UC2 "
CALCULATION NOTE OF FOAM SYSTEM "F101 UC3 "
CALCULATION NOTE OF FOAM SYSTEM "F101 UC4 "
er Discipline Check
stomer Review
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
40 3% 5-Aug-22 5-Oct-22 5-Aug-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
40 3% 5-Aug-22 5-Oct-22
1,400 100.00%
1,400 100.00%
S-C
Electrical – ENG
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w17 2022w18 2022w19 2022w20 202022w22
04/29/22 05/06/22 05/13/22 05/20/22 ### 06/03/22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #DIV/0!
IIR IDC* IFA* IFU*
40% 15% 20% 20%
IIR IDC* IFA* IFU*
40% 15% 20% 20%
RDR IIR IDH* IFD*
15% 30% 40% 10%
Budget
DATA SHEETS 144 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
DATA SHEET- NOZZLE OF GAZ SYSTEM
DATA SHEET - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
DATA SHEET - COUPLING FOR GAS SYSTEM
DATA SHEET- DELUGE VALVE
DATA SHEET- BLADDER TANK
DATA SHEET- FOAM NOZZLE
DATA SHEET- FOAM CONCENTRATE
DATA SHEET - SPRAY NOZZLE
DATA SHEET- BUTERFLY VALVE
DATA SHEET-DRAIN TEST VALVES
DATA SHEET- FLOW SWITCH
DATA SHEET- ALARM CHECK VALVE
DATA SHEET- SPRINKLER HEAD
DATA SHEET-CHECK VALVE
DATA SHEET- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
DATA SHEET- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
DATA SHEET- COUPLING
DATA SHEET-RIA
DATA SHEET-PRESSUR REDUCING VALVE
DATA SHEET- ADDRESSABLE FIRE & GAS ALARM SYSTEM
DATA SHEET- ADRESSABLE SMOKE DETECTOR
DATA SHEET- LINEAR HEAT DETECTOR
DATA SHEET- INDUSTRIAL HEAT DETECTOR
DATA SHEET- FLAME DETECTOR
DATA SHEET- GAS DETECTOR
DATASHEET- SMOKE DETECTOR INTRINSICALLY SAFE
DATA SHEET- MULTI-CRITEREA DETECTOR
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION
DATA SHEET -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
DATA SHEET -INDOOR ALARM
DATA SHEET -OUTDOOR ALARM
DATA SHEET - REMOTE INDICATOR
DATA SHEET -CABLE CR1
DATA SHEET- POWER SUPPLY
DATA SHEET -OUTPUTS MODULE
DATA SHEET -INPUTS MODULE
er Discipline Check
stomer Review
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
4 3% 5-Aug-22 5-Oct-22 5-Aug-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
144 100.00%
144 100.00%
S-C
Electrical – ENG
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w17 2022w18 2022w19 2022w20 202022w22
04/29/22 05/06/22 05/13/22 05/20/22 ### 06/03/22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #DIV/0!
IIR IDC* IFA* IFU*
40% 15% 20% 20%
IIR IDC* IFA* IFU*
40% 15% 20% 20%
RDR IIR IDH* IFD*
15% 30% 40% 10%
Budget
CALCULATIONS 148 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
FM- NOZZLE OF GAZ SYSTEM
FM - FK-5-1-12 CLEAN AGENT FOR GAS SYSTEM
FM - COUPLING FOR GAS SYSTEM
FM- DELUGE VALVE
FM- BLADDER TANK
FM- FOAM NOZZLE
FM- FOAM CONCENTRATE
FM - SPRAY NOZZLE
FM- BUTERFLY VALVE
FM-DRAIN TEST VALVES
FM- FLOW SWITCH
FM- ALARM CHECK VALVE
FM- SPRINKLER HEAD
FM-CHECK VALVE
FM- CARBON STEEL PIPES IN BLACK STEEL WITH ALL ITS ACCESSORIES, FITTINGS
FM- GALVANIZED SEAMLESS CARBON STEEL PIPING SCH 40 WITH ALL ITS ACCESSORIES
FM- COUPLING
NF-RIA
FM-PRESSUR REDUCING VALVE
FM- ADDRESSABLE FIRE & GAS ALARM SYSTEM
FM- ADRESSABLE SMOKE DETECTOR
FM- LINEAR HEAT DETECTOR
FM- INDUSTRIAL HEAT DETECTOR
FM- FLAME DETECTOR
FM- GAS DETECTOR
FM- SMOKE DETECTOR INTRINSICALLY SAFE
FM- MULTI-CRITEREA DETECTOR
FM -MANUAL ALARM CALL POINT DUAL ACTION
FM -MANUAL ALARM CALL POINT DUAL ACTION WEATHER PROOF
FM -MANUAL ABORT STATION
FM -INDOOR ALARM
FM -OUTDOOR ALARM
FM - REMOTE INDICATOR
CABLE CR1
FM-OUTPUTS MODULE
FM -INPUTS MODULE
FM- POWER SUPPLY
er Discipline Check
stomer Review
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
4 3% 5-Aug-22 5-Oct-22 5-Aug-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
4 3% 5-Aug-22 5-Oct-22
148 100.00%
148 100.00%
S-C
Electrical – ENG
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
S-CURVES
Planned
2022w17 2022w18 2022w19 2022w20 202022w22
04/29/22 05/06/22 05/13/22 05/20/22 ### 06/03/22
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
### #DIV/0!
IIR IDC* IFA* IFU*
40% 15% 20% 20%
IIR IDC* IFA* IFU*
40% 15% 20% 20%
RDR IIR IDH* IFD*
15% 30% 40% 10%
Budget
MANUALS 100 hrs
Name
Earned vs Panned
Discipline Activi
IDC*
Issued for Inter Discipline Check
IFA* Issued for Review
IFU* Issued for Use
Data RDR
Collection / Review Design Requirements
IDH*
Issued for Design (with holds)
Issued for Design (without holds)
IFD*
Activity
Name
PRE-COMMISSIONING AND COMMISSIONING MANUAL
OPERATION AND MAINTENANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
n Requirements
SCHEDULE IFC
Baseline Forecast / Actual
Budgeted Weight Factor Start Finish Start Finish
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
25 25% 5-Aug-22 5-Oct-22
100 100.00%
100 100.00%
S-C
S-C
Electrical – ENG
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish 5%
0%
0.00%
S-CURVES
S-CURVES
Planned
Budget
CALCULATIONS 25 hrs
Name
Earned vs Panned
Discipline Activi
Activity
Name
HYDROSTATIC & PNEUMATIC TEST PROCEDURE
FLUSHING TEST PROCEDURE
FIRE DETECTION SYSTEM TEST PROCEDURE
FIRE EXTINGUISHING SYSTEM (SPRINKLER ) TEST PROCEDURE
SAT TEST PROCEDURES -FIRE DETECTION & ALARM SYSTEM
SAT TEST REPORT - FIRE WATER SYSTEMS
SAT TEST REPORT -FIRE DETECTION & ALARM SYSTEM
ITP FOR FIRE SUPRESSION SYSTEMS
ITP FOR FIRE DETECTION & ALARM SYSTEM
QUALITY ASSURANCE MANUAL
CONFIGURATION AND PROGRAMMING MANUAL
FORMATION AND TRAINING MANUAL
TEST AND COMMISSIONING PROCEDURES / CHACK LISTS PER SYSTEM
ITP FOR FIRE DETECTION & ALARM SYSTEM
er Discipline Check
S-C
100%
Electrical – ENG
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
04/20/22 04/27/22 05/04/22 05/11/22 05/18/22
2022w16
WO 04/22/22
Planned #DIV/0!
Actual
Forecast
RULES OF CREDIT
Basis of Design STA
ROC 1.1.01 5%
Reports, Studies and Philosophy STA
ROC 1.1.02 5%
Calculations and Analysis STA
ROC 1.1.03 5%
ROC 1.1.04 5%
Drawings subject to Inter Discipline Check STA
ROC 1.1.05 5%
Drawings not subject to Inter Discipline Check STA
ROC 1.1.06 5%
Drawings subject to HAZOP e.g. P&IDs STA
ROC 1.1.07 5%
Engineering Requisitions STA
ROC 1.1.08 5%
Technical Bid Evaluations STA
ROC 1.1.09 5%
Engineering or Construction Work Packs STA
ROC 1.1.10 5%
Other Generic Documents (subject to Customer Review) STA
ROC 1.1.11 5%
Other Generic Documents (NOT subject to Customer Review) STA
ROC 1.1.12 5%
Documents (Under Code 2 and Code 1 Approvals) STA
ROC 1.1.13 5%
A 0%
M 0%
STA
CR IFD Progr
Forecast / Actual Forecast / Actual Rules of
Start Finish Start Finish
0%
0.00%
S-CURVES
Planned
2022w23 2022w24
06/04/22 06/05/22
0% 0%