Document No.

238-4-DSE-003
Zishan Engineers (Pvt.) Ltd.
An ISO 9001-2015 certified company, Revision 0
47/F, Block 6, PECHS, Karachi-Pakistan
Tel: (92-21) 34393045-48 & 34310151-54 Date 08-11-2022
Fax: (92-21) 34533430 & 34310156
E-mail : contact@zishanengineers.com, Total Pages
Web : www.zishanengineers.com 18
(inc front cover)

ENAR PETROLEUM REFINING FACILITY

GASOLINE PRODUCTION PROJECT

DATA SHEET FOR MV SWITCHGEAR

0 08-11-2022 Issued for Procurement AA MMM NAK

B 25-10-2022 Issued for Approval AA MMM NAK

A 02-11-2021 Issued for Review AA MMM NAK

Rev. Date Description Prepared By Checked By Approved By


CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 2 OF 18

COVERING NOTES

1 The ratings mentioned for components (combination fuse switch, contactor) are preliminary. Supplier to verify and provide the same
as per applicable IEC Standards

2 The protections mentioned in the SLDs shall be provided by the suppler in the form of Microprocessor based electronic protection
relay for incoming and buscoupler breaker/feeder protection.

3 Short circuit ratings, trip ratings and tripping time mentioned in datasheets and drawings are preliminary and shall be verified by
Contractor/Supplier through relevant system interlock studies (complete software based Power System Studies. Short Circuit ,
Load Flow,arc flash,protection cordination,harmonic filteration, that are supposed to be part of RFQ) specified in BOQ and Scope of
work.

4 EPR/soft starter of each motor circuit to be connected in a redundant Modbus RS-485 loop (perferably through daisy-chaining). All
internal modbus connection and wiring shall be provided as pre-installed by the supplier who shall bring out all such Rs-485
connections to a dedicated common terminal block, from where the tie in a PC along with all licensed software provided by bidder.

5 EPR shall also incorporate all metering functions, as required in relevant specifications, drawings and datasheet

6 As an alternate option to provide separate electronic EPR, supplier may incorporate the protection functions in soft starter module.
In this regards, supplier is encouraged to select a soft starter with builtin motor protection functions and metering functions.

8 The CTs quatities shown is minimum. Any other CTs requires shall be estimated by Vendor and same shall be deemed to be
included in the quoted price.

9 This datasheet shall be read in conjunction with SLD # 238-4-ELS-002.Document shall be read in conjunction with Specs

10 The main bus bar of MV switchgear shall be extendable both ways such that it shall remain suitable for tie-in with new MV panel
assembly .

11 Vendor shall seek client/consultant' approval on fabrication /wiring GA drawings complete in all respects prior to proceeding with
actual fabrication / Manufacturing. Also CT/VT sizing calculations to be submitted for client review & approval.

12 All metering /indication/measuring Device shall be digital type.

13 All energy analyzer shall be capable of Measurement of voltage, current, active & reactive power, frequency, active & reactive
energy, power factor, symmetry factor, voltage and current harmonics up to the 21st, total harmonic distortion.Communications:
PROFIBUS-DP, MODBUS RTU / ASCII or IEC communication protocol simple parameterization via front key or RS485
communication port Graphic display with background illumination with up to 20 programmable screens Real-time clock: Measured
values and states will be recorded with time stamps Recording and display of limit value violations and log entries Battery:
Recordings like limit value violations or energy counter values stay safely in the memory up to 1 months in case of a blackout.

14 Motor Protection function shall include Alarm and Trip for following (Overcurrent,Undercurrent,Current imbalance,
overload,Reset,Start-per-hour & etc).Phase Reversal, Thermal & etc
15 Metering Functions includes (Motor load,Current data,Thermal data,Start data,RTD data,Metering & etc)

16 HMI function Display includes (LCD display,Keypad,Status indications include,Fault display,Lockout display & etc)

17 Programmable Outputs includes (Rating,Run, speed,Acceleration,Deceleration & etc) & all necessary required SS feature suitable
reciprocroting compressor application.
18 Installation of Local manufactured CT/PT is not allowed.ALL Panel shall be type tested

19 Bidder to note that all upstream & downstream VCB earth switches are interlocked to avoid hot swtiching.Bidder is also
responsiable for providing all ATS which are mentioned in SLD,Specfication or required for completion of satisfactory operation.

20 Details of required motors data for sizing of Soft Starter will be provided at time of detailed engineering
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 3 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER

1 Reference requirements 238-4-ELS-002 & 238-4-SPE-008

2 Service Conditions
Max.
3 Ambient Temperature 47.2ºC
Min.
4 Min. 36 deg F 0ºC
Max./Min
5 Relative Humidity 90% 45%
Less than
6 Altitude 50 meters

7 Installation Indoor

8 General Design Data

9 System voltage and frequency 11000V 50Hz 3-ph

10 System neutral Solidly Earthed

11 Rated current of busbar system 800A (HOLD)

12 Rated Short-time withstand current (25 kA HOLD), rms 3 sec (See Note 3)

13 Switchgear Control power

14 Closing and Tripping 110 V DC

15 Auxiliary Power 230 V AC

16 Motor / Feeder Circuits - Control power 110 V AC

17 Bus bar insulation Air

18 Type of enclosure Metal-enclosed

IP 4X ( Instrument control box shall be IP 42 at


19 Degree of Protection
minimum)

20 Anti condensation heaters required Yes, 230V, 1ph,50Hz

21 Main Incoming entry (Switchgear) Cable

22 Cable Entry Bottom

23 Cable gland plate Undrilled

24 Test equipment for SSTD Required

25 Surge Suppression Required

26 Loss of service continuity category LSC 2B

27 Internal Arc Classification IAC A FLR

28 Pressure Relief System Absorber/Deflector or equivalent

29 Partition class PM

30 Manufacturer and type

31 Manufacturer Order No.

32 Serial No.

33 Finishing Color RAL 7044/7035 or similar

34 Total Weight of equipment

35 Shipping Dimensions

Remarks:

Vendor shall complete DATA SHEET


CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 4 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER

1 Reference requirements 238-4-ELS-002 & 238-4-SPE-027

2 Service Conditions
Max.
3 Ambient Temperature 47.2ºC
Min.
4 Min. 36 deg F 0ºC
Max./Min
5 Relative Humidity 90% 45%
Less than
6 Altitude 50 meters

7 Installation Indoor

8 General Design Data

9 System voltage and frequency 6600V 50Hz 3-ph

10 System neutral Solidly Earthed

11 Rated current of busbar system 600A (HOLD)

12 Rated Short-time withstand current (31.5 kA HOLD), rms 3 sec (See Note 3)

13 Switchgear Control power

14 Closing and Tripping 110 V DC

15 Auxiliary Power 230 V AC

16 Motor / Feeder Circuits - Control power 110 V AC

17 Bus bar insulation Air

18 Type of enclosure Metal-enclosed

IP 4X (Instrument control box shall be IP 42


19 Degree of Protection
at minimum)

20 Anti condensation heaters required Yes, 230V, 1ph,50Hz

21 Main Incoming entry (Switchgear) Cable

22 Cable Entry Bottom

23 Cable gland plate Undrilled

24 Test equipment for SSTD Required

25 Surge Suppression Required

26 Loss of service continuity category LSC 2B

27 Internal Arc Classification IAC A FLR

28 Pressure Relief System Absorber/Deflector or equivalent

29 Partition class PM

30 Manufacturer and type

31 Manufacturer Order No.

32 Serial No.

33 Finishing Color RAL 7044/7035 or similar

34 Total Weight of equipment

35 Shipping Dimensions

Remarks:

Vendor shall complete DATA SHEET


CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO.

PROJECT GASOLINE PRODUCTION PROJECT REVISION

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO.

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROL GEAR
INCOMER A
1 Panel label reading INCOMER B OUTGOING
Quantity 1 1 2
2 Panel identification number
3 Type of switching device VCB VCB VCB
Rated current switching device
4 800A 800A 800A
A Rated current MV fuses
5
6 Rated voltage 12.0 kV 12.0 kV 12.0 kV
7 Operating voltage 11.0 kV 11.0 kV 11.0 kV
8 Rated frequency 50 Hz 50 Hz 50 Hz
9 Rated short-duration power-freq. withstand voltage 28 kV 28 kV 28 kV
10 Rated lightning impulse withstand voltage 75 kV 75 kV 75 kV
11 Busbar insulation VTS VTS VTS
12 VOLTAGE TRANSFORMERS FOR METERING
Secondary
13 110/√3 110/√3 110/√3
14 VA Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SI
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN INSTALLED BURDEN
BURDEN

15 VA Class 0.2 (AS PER IEC 60044-2) 0.2 (AS PER IEC 60044-2) 0.2 (AS PER IEC 60044-2)
16 VOLTAGE TRANSFORMERS FOR PROTECTION
Secondary
17 110/√3 110/√3 110/√3
18 VA Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SI
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN INSTALLED BURDEN
BURDEN

19 VA Class 3P 3P 3P
20 CURRENT TRANSFORMERS FOR METERING
Secondary
21 800/1 (VTC) 800/1 (VTC) 800/1 (VTC)
22 A Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SI
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN INSTALLED BURDEN
BURDEN

23 VA Class 0.5 0.5 0.5


24 CURRENT TRANSFORMERS FOR PROTECTION
Ratio
25 800/1 (VTC) 800/1 (VTC) 800/1 (VTC)
26 Amp Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SI
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN INSTALLED BURDEN
BURDEN

27 VA Class 5P 5P 5P
28 RELAYS (see note 2)
29 Overcurrent YES YES YES
30 Earth fault YES YES YES
31 Overvoltage YES YES YES
32 Undervoltage YES YES YES
33 Motor winding temp. alarm and trip relay
34 Motor protection relay
35 Tripcircuit monitoring relay
36 Under and over frequency relay YES YES YES
37 Lock-out relay YES YES YES
38 Automatic Transfer Scheme
39 Phase sequence relay YES YES YES
40 Synchro-check relay
41 Bucholz relay
42 Voltmeter
MEASURING AC AND INDICATING (see Note 5 &12)

43 Energy Analyser (see Note 13) YES YES YES


44 YES YES YES
45 Ammeter AC YES YES YES
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO.

PROJECT GASOLINE PRODUCTION PROJECT REVISION

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO.

46 Frequency meter YES YES YES


47 Power-factor meter YES YES YES
48 Ammeter DC
49 Wattmeter YES YES YES
50 Reactive volt-ampere meter
51 Watt-hour meter
52 Maximum-demand indicator
53 INDICATION LAMPS
54 Open YES YES YES
55 Close YES YES YES
56 Fault YES YES YES
57 Others Motor Charging, Earth Switch, Test etc YES YES YES
58 MAIN TERMINALS
59 Incoming / Outgoing Cable Entry TBA TBA TBA
60 Cable data VTS VTS VTS
61 Size VTS VTS VTS
62 Specification VTS VTS VTS
63 CONTROL AND CT CABLE TERMINALS
64 Control Cable : Size and quantity To PMS By Supplier (see note 4) To PMS By Supplier VTS (see note 4) To PMS By Supplier VTS (see note 4)
65 CT Cable: Size VTS VTS VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify
238-4-DSE-003

5 OF 18

INFORMATION TO BE SUBMITTED BY MANUFACTURER

OUTGOING
2

VCB
800A

110/√3
BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN

0.2 (AS PER IEC 60044-2)

110/√3
BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN

3P

800/1 (VTC)
BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN

0.5

800/1 (VTC)
BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN

5P

YES
YES
YES

YES
YES

YES
YES
YES
238-4-DSE-003

6 OF 18

YES
YES

YES

YES
YES
YES
YES

TBA
VTS
VTS
VTS

To PMS By Supplier VTS (see note 4)


VTS
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 7 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROLGEAR
1 Panel label reading Incommer for Trafo #1 & 2 (3 MVA) Incommer for Trafo# 4 & 5 (3.0 MVA)

2 Quantity 2 nos 2 nos


3 Panel identification number
4 Type of switching device VCB VCB
Rated current switching device
5 630A 630A
A Rated current MV fuses (see Note 1)
6
7 Rated voltage 12.0 kV 12.0 kV
8 Operating voltage 11.0 kV 11.0 kV
9 Rated frequency 50 Hz 50 Hz
10 Rated short-duration power-freq. withstand voltage 28 kV 28 kV
11 Rated lightning impulse withstand voltage 75 kV 75 kV
12 Busbar insulation VTS VTS
13 VOLTAGE TRANSFORMERS FOR METERING
Secondary
14 110/√3 110/√3
15 VA Rating BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN INSTALLED BURDEN

16 VA Class 0.2 (AS PER IEC 60044-2) 0.2 (AS PER IEC 60044-2)
17 VOLTAGE TRANSFORMERS FOR PROTECTION
Secondary
18 110/√3 110/√3
19 VA Rating BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN INSTALLED BURDEN

20 VA Class 3P 3P
21 CURRENT TRANSFORMERS FOR METERING
Secondary
22 400/1 (VTC) 400/1 (VTC)
23 A Rating BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN INSTALLED BURDEN

24 VA Class 0.5 0.5


25 CURRENT TRANSFORMERS FOR PROTECTION
Ratio
26 400/1 (VTC) 400/1 (VTC)
27 Amp Rating BY VENDOR AS PER ACTUAL VT SIZING BY VENDOR AS PER ACTUAL VT SIZING
CALCULATION IN ACCORDANCE WITH THE CALCULATION IN ACCORDANCE WITH THE
INSTALLED BURDEN INSTALLED BURDEN

28 VA Class 5P 5P
29 RELAYS (see note 2)
30 Overcurrent YES YES
31 Earth fault YES YES
32 Overvoltage YES YES
33 Undervoltage YES YES
34 Phase balance current protection YES YES
35 Incomplete sequence
36 Tripcircuit monitoring relay
37 Under and over frequency relay YES YES
38 Overload
39 Phase sequence relay YES YES
40 Lock-out relay YES YES
41 Automatic Transfer Scheme
42 Synchro-check relay
43 Bucholz relay
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 8 OF 18

44 MEASURING
Voltmeter AC AND INDICATING (see Note 5 &12)
45 Energy Analyser (see Note 13) YES YES
46 YES YES
47 Ammeter AC YES YES
48 Frequency meter YES YES
49 Power-factor meter YES YES
50 Ammeter DC
51 Wattmeter
52 Reactive volt-ampere meter
53 Watt-hour meter
54 Maximum-demand indicator
55 INDICATION LAMPS
56 Open YES YES
57 Close YES YES
58 Fault YES YES
59 Others Motor Charging, Earth Switch, Test etc YES YES
60 MAIN TERMINALS
61 Incoming / Outgoing Cable Entry TBA TBA
62 Cable data VTS VTS
63 Size VTS VTS
64 Specification VTS VTS
65 CONTROL AND CT CABLE TERMINALS
66 Control Cable : Size and quantity (see note 4) To PMS By Supplier To PMS By Supplier
67 CT Cable: Size VTS VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 9 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROLGEAR
1 Panel label reading Outgoing for Trafo # 4 & 5 (3 MVA)

2 Quantity 2 nos
3 Panel identification number
4 Type of switching device VCB
Rated current switching device
5 630A
A Rated current MV fuses fuses (see Note 1)
6
7 Rated voltage 7.2 kV
8 Operating voltage 6.6 kV
9 Rated frequency 50 Hz
10 Rated short-duration power-freq. withstand voltage 20 kV
11 Rated lightning impulse withstand voltage 60 kV
12 Busbar insulation VTS
13 VOLTAGE TRANSFORMERS FOR METERING
Secondary
14 110/√3
15 VA Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

16 VA Class 0.2 (AS PER IEC 60044-2)


17 VOLTAGE TRANSFORMERS FOR PROTECTION
Secondary
18 110/√3
19 VA Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

20 VA Class 3P
21 CURRENT TRANSFORMERS FOR METERING
Secondary
22 400/1 (VTC)
23 A Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

24 VA Class 0.5
25 CURRENT TRANSFORMERS FOR PROTECTION
Ratio
26 400/1 (VTC)
27 Amp Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

28 VA Class 5P
29
30 RELAYS (see note 2)
31 Overcurrent YES
32 Earth fault YES
33 Overvoltage YES
34 Undervoltage YES
35 Phase balance current protection YES
36 Incomplete sequence
37 Tripcircuit monitoring relay
38 Under and over frequency relay YES
39 Phase sequence relay YES YES
40 Overload
41 Lock-out relay YES
42 Automatic Transfer Scheme YES
43 Synchro-check relay
44 Bucholz relay YES

CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 10 OF 18

45 Voltmeter
MEASURING AC AND INDICATING (see Note 5 &12)

46 Energy Analyser (see Note 13) YES


47 YES
48 Ammeter AC YES
49 Frequency meter YES
50 Power-factor meter YES
51 Ammeter DC
52 Wattmeter
53 Reactive volt-ampere meter
54 Watt-hour meter
55 Maximum-demand indicator
56 INDICATION LAMPS
57 Open YES
58 Close YES
59 Fault YES
60 Others Motor Charging, Earth Switch, Test etc YES
61 MAIN TERMINALS
62 Incoming / Outgoing Cable Entry TBA
63 Cable data VTS
64 Size VTS
65 Specification VTS
66 CONTROL AND CT CABLE TERMINALS
67 Control Cable : Size and quantity (see note 4) To PMS By Supplier
68 CT Cable: Size VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 11 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROLGEAR
1 Panel label reading 6.6 KV Bus coupler/VCB

2 Quantity 1 nos
3 Panel identification number
4 Type of switching device VCB
Rated current switching device
5 630A
A Rated current MV fuses (see Note 1)
6
7 Rated voltage 7.2 kV
8 Operating voltage 6.6 kV
9 Rated frequency 50 Hz
10 Rated short-duration power-freq. withstand voltage 20 kV
11 Rated lightning impulse withstand voltage 60 kV
12 Busbar insulation VTS
13 VOLTAGE TRANSFORMERS FOR METERING
Secondary
14 VTS
VA Rating
15 VTS
16 VA Class VTS
17 VOLTAGE TRANSFORMERS FOR PROTECTION
Secondary
18 VTS
VA Rating
19 VTS
20 VA Class VTS
21 CURRENT TRANSFORMERS FOR METERING
Secondary
22 VTS
A Rating
23 VTS
24 VA Class VTS
25 CURRENT TRANSFORMERS FOR PROTECTION
Ratio
26 VTS
Amp Rating
27 VTS
28 VA Class VTS
29
30 RELAYS (see note 2)
31 Overcurrent YES
32 Earth fault YES
33 Overvoltage
34 Undervoltage
35 Phase balance current protection
36 Incomplete sequence
37 Tripcircuit monitoring relay
38 Under and over frequency relay
39 Overload
40 Lock-out relay YES
41 Automatic Transfer Scheme YES
42 Synchro-check relay
43 Bucholz relay
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 12 OF 18

44 MEASURING
Voltmeter AC AND INDICATING (see Note 5 &12)
45 Energy Analyser (see Note 13) VTS
46 YES
47 Ammeter AC YES
48 Frequency meter YES
49 Power-factor meter YES
50 Ammeter DC
51 Wattmeter
52 Reactive volt-ampere meter
53 Watt-hour meter
54 Maximum-demand indicator
55 INDICATION LAMPS
56 Open YES
57 Close YES
58 Fault YES
59 Others Motor Charging, Earth Switch, Test etc YES
60 MAIN TERMINALS
61 Incoming / Outgoing Cable Entry TBA
62 Cable data VTS
63 Size VTS
64 Specification VTS
65 CONTROL AND CT CABLE TERMINALS
66 Control Cable : Size and quantity (see note 4) To PMS By Supplier
67 CT Cable: Size VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 13 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROLGEAR
1 Panel label reading
Incomer for 6.6 kV Bus bar from Generation 6.6 kV Bus bar

2 Quantity 1 nos
3 Panel identification number
4 Type of switching device VCB
Rated current switching device
5 630A
A Rated current MV fuses (see Note 1)
6
7 Rated voltage 7.2 kV
8 Operating voltage 6.6 kV
9 Rated frequency 50 Hz
10 Rated short-duration power-freq. withstand voltage 20 kV
11 Rated lightning impulse withstand voltage 60 kV
12 Busbar insulation VTS
13 VOLTAGE TRANSFORMERS FOR METERING
Secondary
14 110/√3
15 VA Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

16 VA Class 0.2 (AS PER IEC 60044-2)


17 VOLTAGE TRANSFORMERS FOR PROTECTION
Secondary
18 110/√3
19 VA Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

20 VA Class 3P
21 CURRENT TRANSFORMERS FOR METERING
Secondary
22 400/1 (VTC)
23 A Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

24 VA Class 0.5
25 CURRENT TRANSFORMERS FOR PROTECTION
Ratio
26 400/1 (VTC)
27 Amp Rating BY VENDOR AS PER ACTUAL VT SIZING CALCULATION IN ACCORDANCE WITH
THE INSTALLED BURDEN

28 VA Class 5P
29
30 RELAYS (see note 2)
31 Overcurrent YES
32 Earth fault YES
33 Overvoltage YES
34 Undervoltage YES
35 Phase balance current protection YES
36 Incomplete sequence
37 Tripcircuit monitoring relay
38 Under and over frequency relay YES
39 Overload
40 Lock-out relay YES
41 Automatic Transfer Scheme YES
42 Synchro-check relay
43 Bucholz relay
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 14 OF 18

44 Voltmeter
MEASURING AC AND INDICATING (see Note 5 &12)

45 Energy Analyser (see Note 13) YES


46 YES
47 Ammeter AC YES
48 Frequency meter YES
49 Power-factor meter YES
50 Ammeter DC
51 Wattmeter
52 Reactive volt-ampere meter
53 Watt-hour meter
54 Maximum-demand indicator
55 INDICATION LAMPS
56 Open YES
57 Close YES
58 Fault YES
59 Others Motor Charging, Earth Switch, Test etc YES
60 MAIN TERMINALS
61 Incoming / Outgoing Cable Entry TBA
62 Cable data VTS
63 Size VTS
64 Specification VTS
65 CONTROL AND CT CABLE TERMINALS
66 Control Cable : Size and quantity (see note 4) To PMS By Supplier
67 CT Cable: Size VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 15 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROL GEAR SRR Recycle Gas Compressor Makeup Hydrogen Booster
Compressor

1 Quantity 3 nos 2 nos


2 Panel identification number
3 Type of switching device VCB VCB
4 Rated current switching device 630A 630A
5 A Rated current MV fuses (see note 1)
6 Rated voltage 7.2 kV 7.2 kV
7 Operating voltage 6.6 kV 6.6 kV
8 Rated frequency 50 Hz 50 Hz
9 Rated short-duration power-freq. withstand voltage 20 kV 20 kV
10 Rated lightning impulse withstand voltage 60 kV 60 kV
11 Busbar insulation VTS VTS
12 ELECTRIC MOTOR DATA (see note 20)
13 Rated output KW 455 265
14 kW Full-load current A 49.81A 29.01A
15 A LRC in % of FLC (at 100% Un)
16 % Running-up time (at 80% Un)
17 Allowable running-up time
18 tE time (at 100% Un)
19 Restarting relay required
20 VOLTAGE TRANSFORMERS FOR METERING
21 Secondary 110/√3 OR 120/√3 V 110/√3 OR 120/√3 V
22 VA Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN
BURDEN

23 VA Class 0.2 (AS PER IEC 60044-2) 0.2 (AS PER IEC 60044-2)
24 VOLTAGE TRANSFORMERS FOR PROTECTION
25 Secondary 110/√3 OR 120/√3 V 110/√3 OR 120/√3 V
26 VA Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN
BURDEN

27 VA Class 3P 3P
28 CURRENT TRANSFORMERS FOR METERING
29 Secondary 100/1 (VTC) 100/1 (VTC)
30 A Rating BY VENDOR AS PER ACTUAL CT BY VENDOR AS PER ACTUAL CT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN
BURDEN

31 VA Class 0.5 0.5


32 CURRENT TRANSFORMERS FOR PROTECTION
33 Ratio 100/1 (VTC) 100/1 (VTC)
34 Amp Rating BY VENDOR AS PER ACTUAL CT BY VENDOR AS PER ACTUAL CT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED INSTALLED BURDEN
BURDEN

35 VA Class 5P 5P
36 SOFT STARTER
37 Soft starter Required Required
38 Starting Current 200–600% 200–600%
39 Motor Protection Functions (see note 14) Required Required
40 Metering Functions (see note 15) Required Required
41 Communication Hard wire,Modbus,RS-485,RS-422,RS- Hard wire,Modbus,RS-485,RS-422,RS-232 & etc
232 & etc
42 HMI (see note 16) Required Required
43 Programmable Outputs (see note 17) Required Required

CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 16 OF 18


44 RELAYS (see note 2 & 6)
45 Overcurrent YES YES
46 Earth fault YES YES
47 Overvoltage YES YES
48 Undervoltage YES YES
49 Phase balance current protection YES YES
50 Incomplete sequence YES YES
51 Tripcircuit monitoring relay
52 Under and over frequency relay
53 Overload YES YES
54 Lock-out relay YES YES
55 Automatic Transfer Scheme
56 Synchro-check relay
57 RTD protection YES YES
58 MEASURING AND INDICATING (see Note 5)
59 Voltmeter AC YES YES
60 Ammeter AC YES YES
61 Frequency meter YES YES
62 Power-factor meter YES YES
63 Ammeter DC
64 Wattmeter
65 Reactive volt-ampere meter
66 Watt-hour meter
67 MAIN TERMINALS
68 Incoming / Outgoing Cable Entry TBA TBA
69 Cable data VTS VTS
70 Size VTS VTS
71 Specification VTS VTS
72 CONTROL AND CT CABLE TERMINALS
73 Control Cable : Size and quantity (see note 4) To PMS By Supplier To PMS By Supplier VTS
74 CT Cable: Size VTS VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 17 OF 18

Requirements and conditions INFORMATION TO BE SUBMITTED BY MANUFACTURER


SCHEDULE MV SWITCHGEAR AND CONTROL GEAR NHT Recycle gas Compressor ISOM Recycle gas Compressor

1 Quantity 2 nos 2 nos


2 Panel identification number
3 Type of switching device VCB VCB
4 Rated current switching device 630A 630A
5 A Rated current MV fuses (see note 1)
6 Rated voltage 7.2 kV 7.2 kV
7 Operating voltage 6.6 kV 6.6 kV
8 Rated frequency 50 Hz 50 Hz
9 Rated short-duration power-freq. withstand voltage 20 kV 20 kV
10 Rated lightning impulse withstand voltage 60 kV 60 kV
11 Busbar insulation VTS VTS
12 ELECTRIC MOTOR DATA ( see note 20)
13 Rated output KW 265 215
14 kW Full-load current A 29.01A 23.53
15 A LRC in % of FLC (at 100% Un)
16 % Running-up time (at 80% Un)
17 Allowable running-up time
18 tE time (at 100% Un)
19 Restarting relay required
20 VOLTAGE TRANSFORMERS FOR METERING
21 Secondary 110/√3 OR 120/√3 V 110/√3 OR 120/√3 V
22 VA Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED BURDEN
INSTALLED BURDEN

23 VA Class 0.2 (AS PER IEC 60044-2) 0.2 (AS PER IEC 60044-2)
24 VOLTAGE TRANSFORMERS FOR PROTECTION
25 Secondary 110/√3 OR 120/√3 V 110/√3 OR 120/√3 V
26 VA Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED BURDEN
INSTALLED BURDEN

27 VA Class 3P 3P
28 CURRENT TRANSFORMERS FOR METERING
29 Secondary 100/1 VTC 100/1 VTC
30 A Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED BURDEN
INSTALLED BURDEN

31 VA Class 0.5 0.5


32 CURRENT TRANSFORMERS FOR PROTECTION
33 Ratio 100/1 VTC 100/1VTC
34 Amp Rating BY VENDOR AS PER ACTUAL VT BY VENDOR AS PER ACTUAL VT SIZING
SIZING CALCULATION IN CALCULATION IN ACCORDANCE WITH THE
ACCORDANCE WITH THE INSTALLED BURDEN
INSTALLED BURDEN

35 VA Class 5P 5P
36 SOFT STARTER
37 Soft starter Required Required
38 Starting Current 200–600% 200–600%
39 Motor Protection Functions (see note 14) Required Required
40 Metering Functions (see note 15) Required Required
41 Communication Hard wire,Modbus,RS-485,RS- Hard wire,Modbus,RS-485,RS-422,RS-232 & etc
422,RS-232 & etc

42 HMI (see note 16) Required Required


43 Programmable Outputs (see note 17) Required Required
CLIENT ENAR PETROLEUM REFINING FACILITY DOCUMENT NO. 238-4-DSE-003

PROJECT GASOLINE PRODUCTION PROJECT REVISION 0

TITLE DATA SHEET FOR MV SWITCHGEAR PAGE NO. 18 OF 18


44 RELAYS (see note 2 & 6)
45 Overcurrent YES YES
46 Earth fault YES YES
47 Overvoltage YES YES
48 Undervoltage YES YES
49 Phase balance current protection YES YES
50 Incomplete sequence YES YES
51 Tripcircuit monitoring relay
52 Under and over frequency relay
53 Overload YES YES
54 Lock-out relay YES YES
55 Automatic Transfer Scheme
56 Synchro-check relay
57 RTD protection YES YES
58 MEASURING AND INDICATING (see Note 5)
59 Voltmeter AC YES YES
60 Ammeter AC YES YES
61 Frequency meter YES YES
62 Power-factor meter YES YES
63 Ammeter DC
64 Wattmeter
65 Reactive volt-ampere meter
66 Watt-hour meter
67 MAIN TERMINALS
68 Incoming / Outgoing Cable Entry TBA TBA
69 Cable data VTS VTS
70 Size VTS VTS
71 Specification VTS VTS
72 CONTROL AND CT CABLE TERMINALS
73 Control Cable : Size and quantity (see note 4) To PMS By Supplier To PMS By Supplier VTS
74 CT Cable: Size VTS VTS
REMARKS:
Vendor shall complete DATA SHEET
TBC=To Be Confirmed, NA=Not Applicable, TBA=To Be Advised, VTS=Vendor To Specify