OBRAS PRELIMINARES 1,342.98 662,205.51 PLAN DE SEGURIDAD Y SALUD 17,787.17 662,205.51 MURO DE CONTENCION 299,658.21 180,746.06 662,205.51 PAVIMENTO JR PROLONGACION 340,361.06 237,248.63 662,205.51 32,367.61 43,488.54 GRADERIAS 2,506.58 1,742.49 662,205.51 SISTEMA DE DRENAJE PLUVIAL 11,938.61 8,299.31 662,205.51 SISTEMA DE AGUA POTABLE 164,265.52 27,730.27 662,205.51 SISTEMA DE DESAGUE 86,461.47 662,205.51 POSTES DE ALUMBRADO 26,165.39 18,189.28 662,205.51 CAPACITACION 31,835.18 2,000.00 662,205.51 IMPACTO AMBIENTAL 10,000.00 662,205.51 PLAN DE MONITOREO ARQUEOLOGICO 10,130.72 662,205.51 FLETE TERRESTRE 27,566.02 662,205.51 952,586.69 662,205.51 662,205.51