PROJET : RENOVATION DU CLUB HOUSE PULLMAN EL JADIDA

MAITRE D'OUVRAGE: MADAEF


LOT N°3 · ETANCHEITE REVETEMENT FAUX PLAFOND PEINTURE ET VRD

Entreprises LN BATIMENT
Adresse LN BATIMENT LOT N°3 · ETANCHEITE REVETEMENT FAUX PLAFOND
PEINTURE ET VRD
IMM 89 BIS, RDC LOT FOUTOUH, 12 000, TEMARA ;

LN BATIMENT
MONTANT du Bon de commande TTC 0.00 I.F. 20732322
ICE 001762440000089
MONTANT TX AU FORFAIT : TTC 0.00 R.C. N° 123083
MONTANT TX AU METRE : TTC 2,888,933.13 PATENTE 27901853
CNSS 5313515
C.B 007 810 0001814000003572 14
MONTANT du TX AU METRE : TTC 2,888,933.13 Date 1 er OS 10/11/2021
RETENUE DE GARANTIE - 7% 202,225.32 Délai d'exécution 4 MOIS et 5 jours

DECOMPTE N°7 et dernier DU: 9/17/2022

LIBELLES CUMUL DU MOIS CUMUL DU DCPTE SITUATION DU MOIS


ACTUEL (A) PRECEDENT (B) (A-B)
TRAVAUX AUX METRES 2,815,207.76 2,650,939.74 164,268.02

TRAVAUX AUX FORFAIT 0.00 0.00 0.00

APPROVISIONNEMENT 0.00 0.00 0.00

REVISION DES PRIX 73,725.37 0.00 73,725.37

TOTAL 1 = 2,888,933.13 2,650,939.74 237,993.39

RETENUES :
Retenue de Garantie 202,225.32 197,064.54 5,160.78

Retenue de finition 0.00 0.00 0.00

Compte prorata 0.00 0.00 0.00

Pénalités de retard 0.00 0.00 0.00

Assurance décennale 0.00 0.00 0.00

Divers 0.00 0.00 0.00


TOTAL 2 = 202,225.32 197,064.54 5,160.78
MONTANT DECOMPTE TTC (1) - (2) 2,686,707.81 2,453,875.20 232,832.61

Arrêté le présent décompte à la somme de =

Deux cent trente deux mille huit cent trente deux Dirhams soixante et un centimes toutes Taxes Comprises

MONTANT HT 194,027.18 TVA 20%: 38,805.44


ENTREPRISE
BET NOVEC ARCHITECTE ASMAA CHRAIBI
LN BATIMENT

MAITRE D'OUVRAGE
PROJ T DE RENOVATION DU CLUB H
LOT N°3 · ETANCHEITE REVETEME

situation financière N°7 et dernier - T

N° DES
DESIGNATION DES OUVRAGES
PRIX
I LOTS ARCHITECTURAUX
1.1 SOUS LOT ETANCHEITE
1.1.1 TRAVAUX PREPARATOIRES

Pose de gargouilles ou manchons ou trop


1.1.1.1
plein et gueulard
L'unite :
1.1.1.2 Isolation thermique
Le métre carré :
Couche de desolidarisation (toiture
1.1.1.3
inverse)
Le métre carré :
TOTAL TRAVAUX PREPARATOIRES
1.1.2 COMPLEXE D'ETANCHEITE
Complexe d'étanchéite bi-couche pour
1.1.2.1 terrasse inaccessible y compris couche
d'independance
Le métre carré :
Etanchéité bicouche des salles d'eau
1.1.2.2
(douche)
Le métre carré :
Etanchéité des relevés pour terrasses
1.1.2.3
inaccessible
Le métre linéaire :
TOTAL COMPLEXE D'ETANCHEITE
1.1.3 PROTECTION D'ETANCHEITE
Protection d'étanchéité pour terrasse
1.1.3.1
inaccessible par dallot
Le métre carré :
1.1.3.2 Protection des relevés par enduit grillagé
Le métre linéaire :
TOTAL PROTECTION D'ETANCHEITE
1.1.4 DIVERS
1.1.4.1 Cuvelage pour bassin et bache à eau
Le métre carré :
TOTAL DIVERS
TOTAL SOUS LOT ETANCHEITE (HT)
1.2 SOUS LOT REVETEMENT
1.2.1 REVETEMENTS DES SOLS
Revêtement sol en NSTONE Blu quartz
1.2.1.1
2497
Le métre carré :
Revêtement sol en NSTONE 1621.16
1.2.1.2 FERRARA OOR POLISHED Y/C plinthe
(VARIANTE)
Le métre carré :
Revêtement sol en Carreaux
1.2.1.3
d'importation de 120x120 cm y/c plinthe
Le métre carré :
Revêtement sol en parquet noyer semi
1.2.1.4
massif y/c plinthe
Le métre carré :
Revêtement sol en carreaux de 7,5 x 30
1.2.1.5
pour sanitaire
Le métre carré :
Revêtement sol en carreaux de 22.5 x 22.5
1.2.1.6
pour sanitaire
Le métre carré :
Revêtement sol en carreaux 80 x 80 y/c
1.2.1.7
plinthe
Le métre carré :
Revêtement sol en Marsoul ou
1.2.1.8
Mosaiquey/c escalier
Le métre carré :
TOTAL REVETEMENTS DES SOLS
1.2.2 REVETEMENT DES MURS
Revêtement mural en Carreaux 40 x 80
1.2.2.1
pour sanitaire
Le métre carré :
Revêtement mural en Carreaux 40 x 80
1.2.2.2
pour sanitaire H=1,2m
Le métre carré :
Revétement mural en Carreaux
1.2.2.3
d'importation de 1.20x1.20
Le métre carré :
TOTAL REVETEMENT DES MURS
1.2.3 DIVERS
Marche et contre marche en NSTONE Blu
quartz 2497 et NSTONE 1621.16
1.2.3.1 FERRARA OOR POLISHED y/c plinthe
(VARIANTE)
Le métre linéaire :
TOTAL DIVERS
TOTAL SOUS LOT REVETEMENT
(HT)
1.3 SOUS LOT FAUX PLAFOND
1.3.1 Faux plafond en Staff lisse
Le métre carré :
1.3.2 Faux plafond en Staff lisse hydrofuge
Le métre carré :
1.3.3 Faux plafond en Corde
Le métre carré :
1.3.4 Habillage poteaux en platre BA13
L'unite :
TOTAL SOUS LOT FAUX PLAFOND
(HT)
1.4 SOUS LOT PEINTURE
1.4.1 Peinture façades extérieures
Le métre carré :
1.4.2 Peinture sur mur intérieur
Le métre carré :
1.4.3 Peinture sur faux plafond
Le métre carré :
Peinture sur faux plafond pour sanitaire et
1.4.4
cuisine
Le métre carré :
1.4.5 Papier peint arte collection expedition
Le métre carré :
1.4.6 Papier peint arte collection manila
Le métre carré :
1.4.7 Papier peint in kiastro bianco
Le métre carré :
TOTAL SOUS LOT PEINTURE (HT)
TOTAL LOTS ARCHITECTURAUX
(HT)
II SOUS LOT VRD
VOIRIE ET AMENAGE MENT
2.1
EXTIERIEUR
Terrassement en déblais en tous terrains y
2.1.1
compris évacuation ou mis en remblai
Le métre cube :
2.1.2 Réglage et compactage de fond de forme
Le métre carré :
Foumiture et pase de bordure T3
2.1.3
(28X17X100CM)
Le métre lineaire :
2.1.4 Foumiture et pase de bordure P1
Le métre lineaire :
Couche de fondation en GNF 1 0/ 40 cm de
2.1.5
20cm d'epaisseur
Le métre cube :
Couche de fondation en GNA 0/31,5 cm de
2.1.6
20cm d'epaisseur
Le métre cube :
Foumitire et pase du Pavé autobloquant de
2.1.7
6cm
Le métre carré :
2.1.8 Couche d'impregnation
Le métre carré :
2.1.9 Enrobé de 5cm y c couche d'accrochage
Le métre carré :
Marche et contre marche en pierre de
2.1.10
Tlfelt Gris
Le métre lineaire :
TOTAL AMENAGEMENTS
EXTERIEURS
2.2 ASSAINISSEMENT
Réalisation de branchement au réseau
2.2.1
d'assainissement comprenant:
Reagrd de façade en béton arme avec
2.2.1.1
trappe en fonte classe C250
L'unité :
Foumiture et pose de conduite en PVC S1
DN315mm yc tranchée en tous terrain, lit
2.2.1.2
de pose , remblaiement en terre tamisée et
compactée
Le métre lineaire :
Raccordement sur le regard existant avec
2.2.1.3 la mise a niveau et pose de tampon en fonte
de regard existant
L'ensemble :
TOTAL ASSAINISSEMENT
2.3 EAU POTABLE
Réalisation de branchement au réseau
2.3.1
d'eau potable comprenant:
2.3.1.1 Regard de branchement (compteur EP)
L'unité :
Foumiture et pose de conduite en PEHD
PN16, DN63mm y c tranchée en tous
2.3.1.2
terrain, lit de pose ,remblaiment en terre
tamisée et compactée
Le métre lineaire :
2.3.1.3 Raccordement sur le réseau existant
L'ensemble :
TOTAL EAU POTABLE
TOTAL LOT VRD (HT)

III TRAVAUX SUPPLEMENTAIRES

Travaux de démolition du local caddy y/c :


- dépose des portes, fenêtres et des gréages
HB1 de sécurité. - démolition des murs, de
plancher et de la fondation. - évacuation ou
mise en remblai.
L'unité :
HB2 Enduit en plâtre sur dalle y/c grattage.
Le mètre linéaire :

Fourniture et pose de pierre de TAZA


HB3
(3,00 cm *70,00 cm).
Le mètre linéaire :

Vasque avec revêtement en CORION Bleu


HB4
et cadre en inox (2,00*0,60)
L'unité :

Vasque avec revêtement en CORION Bleu


HB5
et cadre en inox (2,16*0,60)
L'unité :

Fausse poutre en plâtre jonction mâle


femelle de largeur 1,53 m et retours 0,41 et
0,28 m y/c joint pour Lede de 0,10x0,10m
HB6
(Pro-shop joint de dilatation) dév= 2 faces-
2 côtés latéraux - 2 joint pour lede pour L=
6,41 m
Le mètre linéaire :

HB7 L'arase étanche


Le mètre carré :

HB8 Fourniture Faux cadres en bois


Le mètre linéaire :
HB9 Fourniture Faux cadres métaliques
Le mètre linéaire :

HB10 Table cave à vin


L'unité :

Fourniture et pose de carreaux de


HB11
MATERICA GRIGIO MATT 60*120.
Le mètre carré :

Fourniture et pose de joint de dilatation


HB12
terrasse
Le mètre linéaire :

Fourniture et pose de trappe de visite en


HB13
platre hydrofuge ( salle de réunion)
L'unité :
SOUS LOT ETANCHEITE

dépose étanchéité existante y/c démolition


H.B.14
chape et forme existante
le mètre carré:

H.B.15 réalisation forme de pente


le mètre carré:
H.B.16 réalisation chape de lissage
le mètre carré:

H.B.17 réalisation gorge sous solins


le mètre linéaire:

H.B.18 Etanchéité autoprotégé


le mètre carré:

H.B.19 Etanchéité liquide pour dômes


le mètre carré:

SOUS LOT REVETEMENTS

Revêtement sol en casson de marbre


H.B.20
d'importation y/c plinthes
le mère carré:

Revêtement sol en carreaux local Y/C


H.B.21
plinthes
le mère carré:

H.B.22 Niche facade principale de 30x10x15 cm


L'unité;

Revêtement mural en faience blanche de


H.B.23
20x20 cm
le mère carré:
seuil en marbre gris tiflt de Lx0,07 ep=2
H.B.24
cm
le mètre linéaire:

H.B.25 Plinthes sur marbre NSTONE Blue


le mètre linéaire:

H.B.26 seuil en marbre noir de Lx0,31 ep= 2cm


le mètre linéaire:

H.B.27 plot de 10x10x14 cm reprise plot dégradés


caniveau de débordement
l'unité:

support en béton , assise portes ACC


H.B.28
espace membre
le mètre linéaire:

couvre joint type 1 en jonction carreaux


H.B.29
parquet
le mètre linéaire:

couvre joint type 2 en jonction parquet


H.B.30
comptoire
le mètre linéaire:
couvre joint type 3 en jonction parquet
H.B.31
menuiserie Aluminium
le mètre linéaire:

H.B.32 chape en béton


le mètre carré:

sciage cloison simple de 10 cm d'épaisseur


H.B.33 et de largeur 10 cm à la demende de
l'architecte
le mètre linéaire:

SOUS LOT FAUX PLAFOND

H.B.34 Faux poteaux en plâtre


le mètre carré:

H.B.35 Fausse poutre en plâtre de 1,82x0,16x0,21


le mètre linéaire:

habillage poteau restaurant en BA13


H.B.36
hydrofuge
à la demande de l'architecte
le forfait:

H.B.37 remontée faux plafond couloir sanit 1 et 2


de 6 à 10 cm en jonction faux plafond en
bois
le mètre linéaire:

SOUS LOT PEINTURE

H.B.38 Peinture griffet en façades extérieurs


le mètre carré:

H.B.39 Peinture décorative Poteau Pro-shop


l'ensemble:

SOUS LOT VRD

VOIRIE ET AMENAGE MENT


EXTIERIEUR

démolition regards existant au niveau de la


H.B.40 voirie à réaliser
L'unité:

réalisation regard vanne arrosage de 80x80


H.B.41 cm y/c tampon en béton armé
à double cadre escamotable métallique
galvanisé
L'unité:
Condamnation regard de tirage CFA existant
H.B.42 non utilisable de 50x50 cm
l'unité:

H.B.43 Tolonnette en béton de Lx18x20 cm


côté FF3
le mètre linéaire:

réalisation niche façade latérale droite de


H.B.44 2,00x0,60x1,20 m ,couverture tuyauterie
apparente)
l'unité:

dépose et repose bordure de trottoir


H.B.45 existante
le mètre linéaire:

réalisation regard de tirage de teléphone de


H.B.46 50x50 cm y/c trappe en BA et tranché
sondage câble existant et reprise
compactage tanché
l'unité:

ASSAINISSEMENT

mise à niveau regards assainissement


H.B.47 existants
Regard non visitable de 80x80 y/c tampon
H.B.47.1 en béton armé (FP coté Pro-shop)
l'unité:

Regard visitabe de 80x80 cm y/c tampon


H.B.47.2 métallique galvanisé à double cadre
escamotable non compris habillage en pavé.
(FP côté Pro-shop)
l'unité:

Regard non visitabe de 80x80 cm y/c


H.B.47.3 tampon en béton armé (côté fosse à
graisse existante)
l'unité:

dépose canalisation diamètre 200 mm non


H.B.48 opérationnelle
le mètre linéaire:

Réalisation de branchement au réseau


H.B.49 d'assainissement comprenant:
Regard de voirie en béton armé avec
tampon et cadre en fonte classe C400
L'unité :

EAU POTABLE
Regard visitabe de 50x50 cm y/c tampon
H.B.50 métallique galvanisé à double cadre

escamotable non compris habillage en


pavé.raccordement conduites eau potable
(Entrée couloir salle de réunion)
l'unité:
Regard visitable vanne alimentation local
H.B.51 technique de 70x70 cm y/c
tampon en béton arme à double cadre
escamotable métallique galvanisé
l'unité:

réalisation niche coffret eau potable de


H.B.52 1,10x0,90 m
l'unité:

Fourniture et pose d'une trappe métallique


H.B.53 grillagée galvanisée à deux

vantaux de 1,10x 0,90 m et non 1,90x0,90 m


l'unité:

H.B.54 Table cave à vin avec moins value


l'unité:

Réalisation des tours des coupoles en


H.B.55
platres
l'unité:
Interventiuon pour la remise en état de la
H.B.56
cuisine du club house en TCE
Forfait :
TOTAL TRAVAUX SUPPLEMENTAIRES

TOTAL GENERAL (HT)


T.V. A. (20 %)
TOTAL GENERAL (TTC)

RECAPITULATION GENERAL
N° DE
DESIGNATION DES LOTS
LOTS
I LOTS ARCHITECTURAUX
1.1 SOUS LOT ETANCHEITE
1.2 SOUS LOT REVETEMENT
1.3 SOUS LOT FAUX PLAFONO
1.4 SOUS LOT PEINTURE
TOTAL LOTS ARCHITECTURAUX
II LOT VRD
VOIRIE ET AMENAGEMENT
2.1
EXTIERIEUR
2.2 ASSAINISSEMENT
2.3 EAU POTABLE
TOTAL LOT VRD
III TRAVAUX SUPPLEMENTAIRES
TOTAL TRAVAUX
SUPPLEMENTAIRES
TOTAL GENERAL (HT)

T.V.A (20%)

TOTAL GENERAL (TTC)


ION DU CLUB HOUSE A L'HOTEL PULLMAN ELJADIDA
TE REVETEMENT FAUX PLAFOND PEINTURE ET VRD

N°7 et dernier - TRAVAUX REALISES (Offre de Variante)

QUANTITE
PRIX UNITAIRES
U Marché Travaux
(HT)
Réalisés

U 1.00 20.00 500.00

m² 914.00 908.09 100.00

m² 914.00 908.09 31.00

m² 914.00 908.09 135.00


m² 61.00 90.69 180.00

ml 636.00 645.89 65.00

m² 914.00 908.09 65.00

ml 636.00 645.89 30.00

m² 122.00 117.79 250.00

m² 102.00 110.22 2380.00

m² 96.00 82.86 2,000.00


m² 625.00 577.41 559.00

m² 140.00 129.68 700.00

m² 9.00 7.80 550.00

m² 46.00 41.84 350.00

m² 179.00 131.52 440.00

m² 118.00 152.10 160.00

m² 141.58 141.58 350.00

m² 11.38 11.38 350.00


m² 36.00 51.90 559.00

ml 12.00 14.10 1800.00

m² 386.00 468.77 112.00

m² 9.00 12.49 300.00

m² 14.00 6.41 700.00

U 1.00 1.00 4000.00

m² 865.00 1093.82 22.00

m² 1222.00 1222.00 27.00


m² 665.00 665.00 24.00

m² 91.00 78.53 30.00

m² 10.00 12.55 1800.00

m² 11.00 9.79 1900.00

m² 18.00 17.73 2300.00

m3 320.00 325.98 50.00

m² 700.00 714.51 25.00

ml 140.00 135.11 130.00

ml 60.00 77.48 100.00


m3 140.00 142.89 150.00

m3 72.00 70.50 145.00

m² 335.00 324.63 130.00

m² 350.00 345.73 30.00

m² 350.00 345.73 150.00

ml 20.00 8.88 500.00

U 1.00 0.00 3000.00

ml 20.00 18.70 600.00


Ens 1.00 0.00 19500.00

U 1.00 2.00 2000.00

ml 20.00 20.00 160.00

Ens 1.00 1.00 16500.00

ens 1 1.00 99,166.67


ml 70.66 58.17 55.00

ml 25.79 25.79 555.00

U 2 2.00 10,890.00

U 1 1.00 11,761.00

ml 38.46 38.46 80.00

m2 10.05 10.05 75.00

ml 77.59 77.59 55.00


ml 181.14 181.14 40.00

ens 1 0.00 11,000.00

m2 59.81 61.59 559.00

m2 25 25.75 355.00

U 2 2.00 520.00

m2 61.54 90.00

m² 88.79 90.00
m² 88.79 30.00

ml 36.15 50.00

m2 0 160.00

m2 37.92 150.00

m2 10.46 1,200.00

m2 22.37 250.00

u 18 170.00

m2 10.5 250.00
ml 2.85 180.00

ml 18.26 300.00

ml 3.42 680.00

u 42 130.00

ml 20.52 130.00

ml 31.46 400.00

ml 7.94 280.00
ml 36.06 230.00

m2 30.04 70.00

ml 8.52 80.00

m2 2.39 250.00

ml 1.82 200.00

Ft 1 2,500.00
ml 1.2 200.00

m2 739.04 79.00

Ens 1 2,500.00

U 3 1,700.00

U 1 1,500.00
U 1 200.00

ML 3.53 80.00

U 1 1,600.00

ML 21.5 70.00

U 1 1,300.00
U 1 900.00

U 1 2,000.00

U 1 900.00

ML 6 40.00

U 1 8,000.00
U 1 1,500.00

U 1 1,400.00

U 1 500.00

U 1 1,600.00

U 1 4,500.00

U 3 1,000.00
FT 1 20,000.00
AIRES

TION GENERALE
MONTANT MONTANT
PRECEDENT AVENANT 2

404,934.00 417,709.04
1,096,085.00 1,050,658.69
59,732.00 64,736.24
151,014.00 157,343.96
1,711,765.00 1,690,447.93

205,690.00
200,003.35
34,500.00 11,220.00
21,700.00 23,700.00
261,890.00 234,923.35
220,599.81 420,635.19
2,194,254.81 2,346,006.47

438,850.96 469,201.29

2,633,105.77 2,815,207.76
MAN ELJADIDA
NTURE ET VRD

re de Variante)

Montant
MONTANT
Marché Offre
AVENANT 2
Variante

500.00 10,000.00

91,400.00 90,809.00

28,334.00 28,150.79
120,234.00 128,959.79

123,390.00 122,592.15
10,980.00 16,324.20

41,340.00 41,982.85
175,710.00 180,899.20

59,410.00 59,025.85

19,080.00 19,376.70
78,490.00 78,402.55

30,500.00 29,447.50
30,500.00 29,447.50
404,934.00 417,709.04

242,760.00 262,323.60

192,000.00 165,720.00
349,375.00 322,772.19

98,000.00 90,776.00

4,950.00 4,290.00

16,100.00 14,644.00

78,760.00 57,868.80

18,880.00 24,336.00
1,000,825.00 942,730.59

49,553.00 49,553.00

3,983.00 3,983.00
20,124.00 29,012.10
73,660.00 82,548.10

21,600.00 25,380.00
21,600.00 25,380.00
1,096,085.00 1,050,658.69

43,232.00 52,502.24

2,700.00 3,747.00

9,800.00 4,487.00

4,000.00 4,000.00
59,732.00 64,736.24

19,030.00 24,064.04

32,994.00 32,994.00
15,960.00 15,960.00

2,730.00 2,355.92

18,000.00 22,590.00

20,900.00 18,601.00

41,400.00 40,779.00
151,014.00 157,343.96
1,711,765.00 1,690,447.93

16,000.00 16,299.00

17,500.00 17,862.75

18,200.00 17,564.30

6,000.00 7,748.00
21,000.00 21,433.50

10,440.00 10,222.50

43,550.00 42,201.90

10,500.00 10,371.90

52,500.00 51,859.50

10,000.00 4,440.00
205,690.00 200,003.35

3,000.00 0.00

12,000.00 11,220.00
19,500.00 0.00
34,500.00 11,220.00

2,000.00 4,000.00

3,200.00 3,200.00

16,500.00 16,500.00
21,700.00 23,700.00
261,890.00 234,923.35

99,166.67 99,166.67
3,886.30 3,199.35

14,313.45 14,313.45

21,780.00 21,780.00

11,761.00 11,761.00

3,076.80 3,076.80

753.75 753.75

4,267.45 4,267.45
7,245.60 7,245.60

11,000.00 -

33,433.79 34,428.81

8,875.00 9,141.25

1,040.00 1,040.00

5,538.60

7,991.10
2,663.70

1,807.50

5,688.00

12,552.00

5,592.50

3,060.00

2,625.00
513.00

5,478.00

2,325.60

5,460.00

2,667.60

12,584.00

2,223.20
8,293.80

2,102.80

681.60

597.50

364.00

2,500.00
240.00

58,384.16

2,500.00

5,100.00

1,500.00
200.00

282.40

1,600.00

1,505.00

1,300.00
900.00

2,000.00

900.00

240.00

8,000.00
1,500.00

1,400.00

500.00

1,600.00

4,500.00

3,000.00
20,000.00
220,599.81 420,635.19

2,194,254.81 2,346,006.47
438,850.96 469,201.29
2,633,105.77 2,815,207.76
PROJ T DE RENOVATION DU CLUB HOUSE A L
LOT N°3 · ETANCHEITE REVETEMENT FAUX

ATTACHEMENTS N° 7 et dernier - TRAVAUX

N° DES
DESIGNATION DES OUVRAGES
PRIX
I LOTS ARCHITECTURAUX
1.1 SOUS LOT ETANCHEITE
1.1.1 TRAVAUX PREPARATOIRES

Pose de gargouilles ou manchons ou trop plein


1.1.1.1
et gueulard
L'unite :
1.1.1.2 Isolation thermique
Le métre carré :
1.1.1.3 Couche de desolidarisation (toiture inverse)
Le métre carré :
TOTAL TRAVAUX PREPARATOIRES
1.1.2 COMPLEXE D'ETANCHEITE

Complexe d'étanchéite bi-couche pour terrasse


1.1.2.1
inaccessible y compris couche d'independance

Le métre carré :
1.1.2.2 Etanchéité bicouche des salles d'eau (douche)
Le métre carré :
Etanchéité des relevés pour terrasses
1.1.2.3
inaccessible
Le métre linéaire :
TOTAL COMPLEXE D'ETANCHEITE
1.1.3 PROTECTION D'ETANCHEITE
Protection d'étanchéité pour terrasse
1.1.3.1
inaccessible par dallot
Le métre carré :
1.1.3.2 Protection des relevés par enduit grillagé
Le métre linéaire :
TOTAL PROTECTION D'ETANCHEITE
1.1.4 DIVERS
1.1.4.1 Cuvelage pour bassin et bache à eau
Le métre carré :
TOTAL DIVERS
TOTAL SOUS LOT ETANCHEITE (HT)
1.2 SOUS LOT REVETEMENT
1.2.1 REVETEMENTS DES SOLS
1.2.1.1 Revêtement sol en NSTONE Blu quartz 2497
Le métre carré :
Revêtement sol en NSTONE 1621.16
1.2.1.2 FERRARA OOR POLISHED Y/C plinthe
(VARIANTE)
Le métre carré :
Revêtement sol en Carreaux d'importation de
1.2.1.3
120x120 cm y/c plinthe
Le métre carré :
Revêtement sol en parquet noyer semi massif
1.2.1.4
y/c plinthe
Le métre carré :
Revêtement sol en carreaux de 7,5 x 30 pour
1.2.1.5
sanitaire
Le métre carré :
Revêtement sol en carreaux de 22.5 x 22.5
1.2.1.6
pour sanitaire
Le métre carré :
1.2.1.7 Revêtement sol en carreaux 80 x 80 y/c plinthe
Le métre carré :
Revêtement sol en Marsoul ou Mosaiquey/c
1.2.1.8
escalier
Le métre carré :
TOTAL REVETEMENTS DES SOLS
1.2.2 REVETEMENT DES MURS
Revêtement mural en Carreaux 40 x 80 pour
1.2.2.1
sanitaire
Le métre carré :
Revêtement mural en Carreaux 40 x 80 pour
1.2.2.2
sanitaire H=1,2m
Le métre carré :
Revétement mural en Carreaux d'importation
1.2.2.3
de 1.20x1.20
Le métre carré :
TOTAL REVETEMENT DES MURS
1.2.3 DIVERS
Marche et contre marche en NSTONE Blu
1.2.3.1 quartz 2497 et NSTONE 1621.16 FERRARA
OOR POLISHED y/c plinthe (VARIANTE)
Le métre linéaire :
TOTAL DIVERS
TOTAL SOUS LOT REVETEMENT (HT)
1.3 SOUS LOT FAUX PLAFOND
1.3.1 Faux plafond en Staff lisse
Le métre carré :
1.3.2 Faux plafond en Staff lisse hydrofuge
Le métre carré :
1.3.3 Faux plafond en Corde
Le métre carré :
1.3.4 Habillage poteaux en platre BA13
L'unite :
TOTAL SOUS LOT FAUX PLAFOND (HT)
1.4 SOUS LOT PEINTURE
1.4.1 Peinture façades extérieures
Le métre carré :
1.4.2 Peinture sur mur intérieur
Le métre carré :
1.4.3 Peinture sur faux plafond
Le métre carré :
Peinture sur faux plafond pour sanitaire et
1.4.4
cuisine
Le métre carré :
1.4.5 Papier peint arte collection expedition
Le métre carré :
1.4.6 Papier peint arte collection manila
Le métre carré :
1.4.7 Papier peint in kiastro bianco
Le métre carré :
TOTAL SOUS LOT PEINTURE (HT)
TOTAL LOTS ARCHITECTURAUX (HT)
II SOUS LOT VRD
VOIRIE ET AMENAGE MENT
2.1
EXTIERIEUR
Terrassement en déblais en tous terrains y
2.1.1
compris évacuation ou mis en remblai
Le métre cube :
2.1.2 Réglage et compactage de fond de forme
Le métre carré :
Foumiture et pase de bordure T3
2.1.3
(28X17X100CM)
Le métre lineaire :
2.1.4 Foumiture et pase de bordure P1
Le métre lineaire :
Couche de fondation en GNF 1 0/ 40 cm de
2.1.5
20cm d'epaisseur
Le métre cube :
Couche de fondation en GNA 0/31,5 cm de
2.1.6
20cm d'epaisseur
Le métre cube :
Foumitire et pase du Pavé autobloquant de
2.1.7
6cm
Le métre carré :
2.1.8 Couche d'impregnation
Le métre carré :
2.1.9 Enrobé de 5cm y c couche d'accrochage
Le métre carré :
Marche et contre marche en pierre de Tlfelt
2.1.10
Gris
Le métre lineaire :
TOTAL AMENAGEMENTS EXTERIEURS
2.2 ASSAINISSEMENT
Réalisation de branchement au réseau
2.2.1
d'assainissement comprenant:
Reagrd de façade en béton arme avec trappe
2.2.1.1
en fonte classe C250
L'unité :
Foumiture et pose de conduite en PVC S1
DN315mm yc tranchée en tous terrain, lit de
2.2.1.2
pose , remblaiement en terre tamisée et
compactée
Le métre lineaire :
Raccordement sur le regard existant avec la
2.2.1.3 mise a niveau et pose de tampon en fonte de
regard existant
L'ensemble :
TOTAL ASSAINISSEMENT
2.3 EAU POTABLE
Réalisation de branchement au réseau d'eau
2.3.1
potable comprenant:
2.3.1.1 Regard de branchement (compteur EP)
L'unité :
Foumiture et pose de conduite en PEHD PN16,
DN63mm y c tranchée en tous terrain, lit de
2.3.1.2
pose ,remblaiment en terre tamisée et
compactée
Le métre lineaire :
2.3.1.3 Raccordement sur le réseau existant
L'ensemble :
TOTAL EAU POTABLE
TOTAL LOT VRD (HT)
III TRAVAUX SUPPLEMENTAIRES

Travaux de démolition du local caddy y/c : -


dépose des portes, fenêtres et des gréages de
HB1 sécurité. - démolition des murs, de plancher et
de la fondation. - évacuation ou mise en
remblai.
L'unité :

HB2 Enduit en plâtre sur dalle y/c grattage.


Le mètre linéaire :

Fourniture et pose de pierre de TAZA (3,00


HB3
cm *70,00 cm).
Le mètre linéaire :

Vasque avec revêtement en CORION Bleu et


HB4
cadre en inox (2,00*0,60)
L'unité :

Vasque avec revêtement en CORION Bleu et


HB5
cadre en inox (2,16*0,60)
L'unité :
Fausse poutre en plâtre jonction mâle femelle
de largeur 1,53 m et retours 0,41 et 0,28 m y/c
HB6 joint pour Lede de 0,10x0,10m (Pro-shop joint
de dilatation) dév= 2 faces- 2 côtés latéraux - 2
joint pour lede pour L= 6,41 m
Le mètre linéaire :

HB7 L'arase étanche


Le mètre carré :

HB8 Fourniture Faux cadres en bois


Le mètre linéaire :

HB9 Fourniture Faux cadres métaliques


Le mètre linéaire :

HB10 Table cave à vin


L'unité :

Fourniture et pose de carreaux de


HB11
MATERICA GRIGIO MATT 60*120.
Le mètre carré :

Fourniture et pose de joint de dilatation


HB12
terrasse
Le mètre linéaire :

Fourniture et pose de trappe de visite en


HB13
platre hydrofuge ( salle de réunion)
L'unité :
SOUS LOT ETANCHEITE

dépose étanchéité existante y/c démolition


H.B.14
chape et forme existante
le mètre carré:

H.B.15 réalisation forme de pente


le mètre carré:

H.B.16 réalisation chape de lissage


le mètre carré:

H.B.17 réalisation gorge sous solins


le mètre linéaire:

H.B.18 Etanchéité autoprotégé


le mètre carré:

H.B.19 Etanchéité liquide pour dômes


le mètre carré:
SOUS LOT REVETEMENTS

Revêtement sol en casson de marbre


H.B.20
d'importation y/c plinthes
le mère carré:

H.B.21 Revêtement sol en carreaux local Y/C plinthes


le mère carré:

H.B.22 Niche facade principale de 30x10x15 cm


L'unité;

Revêtement mural en faience blanche de 20x20


H.B.23
cm
le mère carré:

H.B.24 seuil en marbre gris tiflt de Lx0,07 ep=2 cm


le mètre linéaire:

H.B.25 Plinthes sur marbre NSTONE Blue


le mètre linéaire:

H.B.26 seuil en marbre noir de Lx0,31 ep= 2cm


le mètre linéaire:
H.B.27 plot de 10x10x14 cm reprise plot dégradés
caniveau de débordement
l'unité:

support en béton , assise portes ACC espace


H.B.28
membre
le mètre linéaire:

couvre joint type 1 en jonction carreaux


H.B.29
parquet
le mètre linéaire:

couvre joint type 2 en jonction parquet


H.B.30
comptoire
le mètre linéaire:

couvre joint type 3 en jonction parquet


H.B.31
menuiserie Aluminium
le mètre linéaire:

H.B.32 chape en béton


le mètre carré:

sciage cloison simple de 10 cm d'épaisseur et


H.B.33
de largeur 10 cm à la demende de l'architecte
le mètre linéaire:

SOUS LOT FAUX PLAFOND

H.B.34 Faux poteaux en plâtre


le mètre carré:

H.B.35 Fausse poutre en plâtre de 1,82x0,16x0,21


le mètre linéaire:

habillage poteau restaurant en BA13


H.B.36
hydrofuge
à la demande de l'architecte
le forfait:

H.B.37 remontée faux plafond couloir sanit 1 et 2


de 6 à 10 cm en jonction faux plafond en bois
le mètre linéaire:

SOUS LOT PEINTURE

H.B.38 Peinture griffet en façades extérieurs


le mètre carré:

H.B.39 Peinture décorative Poteau Pro-shop


l'ensemble:

SOUS LOT VRD

VOIRIE ET AMENAGE MENT


EXTIERIEUR

démolition regards existant au niveau de la


H.B.40 voirie à réaliser
L'unité:

réalisation regard vanne arrosage de 80x80 cm


H.B.41 y/c tampon en béton armé
à double cadre escamotable métallique
galvanisé
L'unité:

Condamnation regard de tirage CFA existant


H.B.42 non utilisable de 50x50 cm
l'unité:

H.B.43 Tolonnette en béton de Lx18x20 cm


côté FF3
le mètre linéaire:
réalisation niche façade latérale droite de
H.B.44 2,00x0,60x1,20 m ,couverture tuyauterie
apparente)
l'unité:

H.B.45 dépose et repose bordure de trottoir existante


le mètre linéaire:

réalisation regard de tirage de teléphone de


H.B.46 50x50 cm y/c trappe en BA et tranché
sondage câble existant et reprise compactage
tanché
l'unité:

ASSAINISSEMENT

H.B.47 mise à niveau regards assainissement existants


Regard non visitable de 80x80 y/c tampon en
H.B.47.1 béton armé (FP coté Pro-shop)
l'unité:

Regard visitabe de 80x80 cm y/c tampon


H.B.47.2 métallique galvanisé à double cadre
escamotable non compris habillage en pavé. (FP
côté Pro-shop)
l'unité:

Regard non visitabe de 80x80 cm y/c tampon en


H.B.47.3 béton armé (côté fosse à
graisse existante)
l'unité:

dépose canalisation diamètre 200 mm non


H.B.48 opérationnelle
le mètre linéaire:

Réalisation de branchement au réseau


H.B.49 d'assainissement comprenant:
Regard de voirie en béton armé avec tampon et
cadre en fonte classe C400
L'unité :

EAU POTABLE

Regard visitabe de 50x50 cm y/c tampon


H.B.50 métallique galvanisé à double cadre

escamotable non compris habillage en


pavé.raccordement conduites eau potable
(Entrée couloir salle de réunion)
l'unité:
Regard visitable vanne alimentation local
H.B.51 technique de 70x70 cm y/c
tampon en béton arme à double cadre
escamotable métallique galvanisé
l'unité:

réalisation niche coffret eau potable de


H.B.52 1,10x0,90 m
l'unité:

Fourniture et pose d'une trappe métallique


H.B.53 grillagée galvanisée à deux
vantaux de 1,10x 0,90 m et non 1,90x0,90 m
l'unité:

H.B.54 Table cave à vin avec moins value


l'unité:

H.B.55 Réalisation des tours des coupoles en platres


l'unité:
Interventiuon pour la remise en état de la
H.B.56
cuisine du club house en TCE
Forfait :
TOTAL TRAVAUX SUPPLEMENTAIRES
UB HOUSE A L'HOTEL PULLMAN ELJADIDA
EMENT FAUX PLAFOND PEINTURE ET VRD

er - TRAVAUX REALISES (Offre de Variante)

QUANTITE
U Marché Travaux
Réalisés

U 1.00 20.00

m² 914.00 908.09

m² 914.00 908.09

m² 914.00 908.09
m² 61.00 90.69

ml 636.00 645.89

m² 914.00 908.09

ml 636.00 645.89

m² 122.00 117.79

m² 102.00 110.22
m² 96.00 82.86

m² 625.00 577.41

m² 140.00 129.68

m² 9.00 7.80

m² 46.00 41.84

m² 179.00 131.52

m² 118.00 152.10
m² 141.58 141.58

m² 11.38 11.38

m² 36.00 37.38

ml 12.00 14.10

m² 386.00 468.77

m² 9.00 12.49

m² 14.00 6.41

U 1.00 1.00
m² 865.00 1093.82

m² 1222.00 1222.00

m² 665.00 665.00

m² 91.00 78.42

m² 10.00 12.55

m² 11.00 9.79

m² 18.00 17.73

m3 320.00 325.98

m² 700.00 714.51
ml 140.00 135.11

ml 60.00 77.48

m3 140.00 142.89

m3 72.00 70.50

m² 335.00 324.63

m² 350.00 345.73

m² 350.00 345.73

ml 20.00 8.88
U 1.00 0.00

ml 20.00 18.70

Ens 1.00 0.00

U 1.00 2.00

ml 20.00 20.00

Ens 1.00 1.00


ens 1 1.00

ml 70.66 58.17

ml 25.79 25.79

U 2 2.00

U 1 1.00
ml 38.46 38.46

m2 10.05 10.05

ml 77.59 77.59

ml 181.14 181.14

ens 1 0.00

m2 59.81 61.59
m2 25 25.75

U 2 2.00

m2 61.54

m² 88.79

m² 88.79

ml 36.15

m2 0.00

m2 37.92
m2 10.46

m2 22.37

u 18.00

m2 10.50

ml 2.85

ml 18.26

ml 3.42
u 42.00

ml 20.52

ml 31.46

ml 7.94

ml 36.06

m2 30.04
ml 8.52

m2 2.39

ml 1.82

Ft 1.00

ml 1.20

m2 739.04
Ens 1.00

U 3.00

U 1.00

U 1.00

ML 3.53
U 1.00

ML 21.50

U 1.00

U 1.00
U 1.00

U 1.00

ML 6.00

U 1.00
U 1.00

U 1.00

U 1.00

U 1.00

U 1.00

U 3.00

FT 1.00
PROJET : RENOVATION DU CLUB HOUSE PULL
MAITRE D'OUVRAGE: MADAEF
LOT N 3 : ETANCHEITE, REVETEMENT,FAUX PLAFOND
ENTREPRISE : LN BATIMENT SARL
NOTE DE CALCUL DE LA REVISION DE

DATE D'OUVERTURE 22/09/2021


BAT6° 231.4 Délais 3mois

O.SERVICE O.ARRET O.REPRISE O.ARRET O.REPRISE O.ARRET O.REPRISE


11/10/2021 12/23/2021 1/21/2022 2/28/2022 3/14/2022 3/25/2022 5/11/2022

Période Période
Période partielle(PP) cumuléé(PC)
N° des Décomptes

10/11/21 30/11/21 20
DECOMPTE N°1 24/01/2022 47
01/12/21 23/12/21 23

21/01/22 24/01/22 4

25/01/22 31/01/22 7
DECOMPTE N°2 24/02/2022 31

01/02/22 24/02/22 24

25/02/22 28/02/22 4
DECOMPTE N°3 24/03/2022 15

14/03/22 24/03/22 11

11/05/22 16/05/22 6
DECOMPTE N°4 24/05/2022 8

23/05/22 24/05/22 2

25/05/22 31/05/22 7
DECOMPTE N°5 01/06/2022 9

01/06/22 02/06/22 2

30/08/22 31/08/22 2
DECOMPTE N°6 09/09/2022 11

01/09/22 09/09/22 9
TOTAL HT

TVA (20%)

TOTAL TTC
CLUB HOUSE PULLMAN EL JADIDA
'OUVRAGE: MADAEF
MENT,FAUX PLAFOND,PEINTURE ET VRD
E : LN BATIMENT SARL
DE LA REVISION DES PRIX

O.ARRET O.REPRISE O.ARRET O.REPRISE


5/16/2022 5/23/2022 6/2/2022 8/30/2022

Index du mois Montant des 0,15+0,85*(BAT6/ Total de la révision


Mt DP/(PC*PP)
BAT6 Décomptes HT BAT6°)-1 HT

233.1 210,530.06 0.0062 1,305.28


494,745.66
233.5 242,109.57 0.0077 1,864.24

234.5 42,106.01 0.0113 475.79

234.5 57,330.94 0.0113 647.83


253,894.20

236.2 196,563.25 0.0176 3,459.51

236.2 87,945.60 0.0176 1,547.84


329,796.01

240 241,850.40 0.0315 7,618.28

248 291,229.36 0.0609 17,735.86


388,305.81

248 97,076.45 0.0609 5,911.95

248 105,564.12 0.0609 6,428.85


135,725.30

248.8 30,161.17 0.0639 1,927.29

248 35,916.49 0.0609 2,187.31


197,540.70

248.8 161,624.20 0.0639 10,327.78


HT
61,437.81
%)
12,287.56
TC
73,725.37