(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
Yassine International ( Les ouvriers de Gregori ne sont pas tous Equiper tout les ouvriers des EPI
1 SDO FY13 45 D Findings Contractor HSE 6-Nov-12 14-Nov-12 Closed
Fakhraddine Aménagement équipés de tout les EPI réglementaires. réglementaires
Ville Verte)
Gregori
Les ouvriers de Gregori utilsent les
Yassine International ( Prévoir un moyen de transport plus sécuriser et Contractor
2 SDO FY13 45 D Findings carrosseries des tracteurs comme siége pour 6-Nov-12 30-Nov-12 Closed
Fakhraddine Aménagement arreter cette pratique Supervisor
se déplacer
Ville Verte)
Thermodarias (
Claude Encourager le housekeeping fait par les chefs Contractor
3 SOR FY13 45 Villas A Findings Mauvais rangement des zone de stockages 8-Nov-12 8-Nov-12 Closed
Blanchemain d'équipe Supervisor
Chercheurs)
Thermodarias (
Claude Equiper tout les ouvriers de gants spécifiques a
4 SOR FY13 45 Villas D Findings Les ouvriers n'ont pas tous des gants Contractor HSE 8-Nov-12 30-Nov-12 Closed
Blanchemain leurs taches
Chercheurs)
Thermodarias (
Yassine Mauvaise manutention des panneaux de
5 SDO FY13 45 Villas H Findings Utilser fourche ou grue mobile Contractor HSE 8-Nov-12 30-Nov-12 Closed
Fakhraddine coffrage
Chercheurs)
Thermodarias (
Yassine Poste de travail à la cisaille non entièrement
6 SDO FY13 45 Villas J Findings Mettre en place carter de protection en bois Contractor HSE 8-Nov-12 30-Nov-12 Closed
Fakhraddine protégé
Chercheurs)
Thermodarias (
Yassine Maintenir les bouteilles de gaz horizantalement
7 SDO FY13 45 Villas A Findings Stockage non conforme des bouteilles de gaz Contractor HSE 8-Nov-12 14-Nov-12 Closed
Fakhraddine et solidement
Chercheurs)
Thermodarias (
Yassine Réserver au moins 1 mètre entre le poste de
11 SDO FY13 46 Villas A Findings Poste de travail encombré Contractor HSE 13-Nov-12 30-Nov-12 Closed
Fakhraddine travail et le ferraillage stocké
Chercheurs)
Thermodarias (
Yassine
12 SDO FY13 47 Villas T Findings Pictogrammes de danger et affichage insuffisant Prévoir affichage de sensibilsation suffisant Contractor HSE 19-Nov-12 30-Nov-12 Closed
Fakhraddine
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Yassine Distribuer les EPI et sensibilser a propos de
13 Inspection FY13 47 Villas D Findings Epi insuffisant Contractor HSE 21-Nov-12 21-Nov-12 Closed
Fakhraddine leur port
Chercheurs)
Gregori
Yassine International ( Ne plus accrocher les SPA aux engins.Prévoir Yassine
14 SDO FY13 47 R Findings Spa accroché aux engins 22-Nov-12 22-Nov-12 Closed
Fakhraddine Aménagement panneaux d'affichage Fakhraddine
Ville Verte)
Gregori
Yassine International (
15 SDO FY13 47 E Findings Balisage incompet Baliser la zone de la tranche prés d'un lycée Contractor HSE 22-Nov-12 22-Nov-12 Closed
Fakhraddine Aménagement
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Yassine Excavations de faibles profondeur non balisées
16 SDO FY13 47 Villas K Findings Baliser les excavations de 40 cm de profondeur Contractor HSE 22-Nov-12 22-Nov-12 Closed
Fakhraddine : Risque de trébuchement
Chercheurs)
Gregori
Yassine International ( Stationnenement non conforme de 4 voitures a Sensibilser l'agent de sécurité affecté a la base Yassine
17 SDO FY13 47 I Findings 22-Nov-12 22-Nov-12 Closed
Fakhraddine Aménagement la Base vie vie,sensbilser les conducteurs Fakhraddine
Ville Verte)
Gregori
Yassine International ( Positive
18 SDO FY13 47 D Port des EPI par tout le personnel 22-Nov-12
Fakhraddine Aménagement Observation
Ville Verte)
Thermodarias (
Yassine Levage non conforme : utilsation de chaine S'appovisionner en Elingues textiles,sensibliser Contractor
19 SDO FY13 47 Villas F Findings 22-Nov-12 30-Nov-12 Closed
Fakhraddine métallique pour lever fardeau d'acier les riggers Manager
Chercheurs)
Thermodarias (
Yassine Cable electrique sans gaine et passant dans Prévoir des gaines industrielles et sensibilser le
21 Inspection FY13 47 Villas L Findings Contractor HSE 22-Nov-12 30-Nov-12 Closed
Fakhraddine une marre d'eau personnel
Chercheurs)
Thermodarias (
Yassine Protection non compléte d'une fosse : Le
22 Inspection FY13 47 Villas B Findings Remplacer le Balisage par une protection rigide Contractor HSE 23-Nov-12 30-Nov-12 Closed
Fakhraddine balisage est insuffisant
Chercheurs)
Thermodarias (
Yassine Sensibiliser les conducteurs d'engins aux
23 SDO FY13 48 Villas I Findings Les engins roulent leur godet suspendu en haut Contractor HSE 26-Nov-12 26-Nov-12 Closed
Fakhraddine bonnes pratiques
Chercheurs)
Thermodarias (
Yassine
24 SDO FY13 48 Villas D Findings Chauffeur de camion,a terre, sans aucun EPI Emmettre un avertissement Contractor HSE 26-Nov-12 26-Nov-12 Closed
Fakhraddine
Chercheurs)
Thermodarias (
Yassine Sensibiliser les soudeurs de la bonne pratique
25 SDO FY13 48 Villas M Findings Clapet anti-retour mal installés Contractor HSE 26-Nov-12 30-Nov-12 Closed
Fakhraddine a adopter
Chercheurs)
Thermodarias (
Yassine Rendre le stockage conforme et sensibiliser le
26 SDO FY13 48 Villas M Findings Stockage non conforme des bouteilles de gaz Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine personnel
Chercheurs)
Thermodarias (
Yassine
27 SDO FY13 48 Villas I Findings Absence de bip de recul sur un camion Equipper le camion d'un bip de recul Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Yassine Mettre en conformité les échaffaudages (
28 SDO FY13 48 Villas C Findings Echaffaudages non conformes Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine Garde corps et accés)
Chercheurs)
Thermodarias (
Yassine Entreposage de bouts de bois cloutés en pleine
29 SDO FY13 48 Villas A Findings Nettoyer la zone et sensibliser les boiseurs Contractor HSE 27-Nov-12 27-Nov-12 Closed
Fakhraddine zone de travail
Chercheurs)
Thermodarias (
Yassine Tailleur de pierre sans gants et portant des
30 SDO FY13 48 Villas D Findings Equipper tout les ouvriers de gants Contractor HSE 27-Nov-12 27-Nov-12 Closed
Fakhraddine pierres
Chercheurs)
Thermodarias (
Yassine Présence de galets au dessous des bennes à Proceder a une vérification compléte des
31 SDO FY13 48 Villas F Findings Contractor HSE 27-Nov-12 27-Nov-12 Closed
Fakhraddine bétons (Risque de chute lors du levage) bennes avant levage
Chercheurs)
Thermodarias (
Yassine Remplacer les cables rafistolés par de
32 SDO FY13 48 Villas L Findings Cables électriques déffectueux Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine nouveaux cables
Chercheurs)
Thermodarias (
Yassine Télecharger les FDS et les mettre a disposition
34 SDO FY13 48 Villas T Findings Absence de fiches de données de sécurité Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine du magasinier
Chercheurs)
Thermodarias (
Yassine
35 SDO FY13 48 Villas A Findings Protection insufisante des fers en attente Proteger systématiquement tout angles vifs Contractor HSE 27-Nov-12 27-Nov-12 Closed
Fakhraddine
Chercheurs)
Thermodarias (
Yassine Absence de bips de recul sur la chargeuse Equipper la chargeuse compacte par un bip de
36 SDO FY13 48 Villas I Findings Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine compacte recul
Chercheurs)
Thermodarias (
Yassine Abssence de bottes de sécurité pour les Fournir les Bottes de sécurité pour tous les
37 SDO FY13 48 Villas D Findings Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine ouvriers travaillant dans le levage de galets ouvriers travaillant dans le lavage de gallet
Chercheurs)
Thermodarias (
Yassine Les fouilles ( profondeur de 80 cm ) concues Prévoir des accés sécurisés pour les fouilles de
38 SDO FY13 48 Villas E Findings Contractor HSE 27-Nov-12 30-Nov-12 Closed
Fakhraddine pour les semelles sont sans accés 80 cm
Chercheurs)
Thermodarias (
Yassine
39 Inspection FY13 48 Villas F Findings Levage de bennes au dessus d'ouvriers Sensibiliser le personnel et le grutier Contractor HSE 28-Nov-12 28-Nov-12 Closed
Fakhraddine
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Yassine Opération de soudure sans présence
40 Inspection FY13 48 Villas M Findings Arret de l'opération et Sensibilser les soudeurs Contractor HSE 28-Nov-12 28-Nov-12 Closed
Fakhraddine d'extincteurs dans la zone
Chercheurs)
Thermodarias (
Yassine Manque de formation spécifique préalable Prévoir formation ciblant les travailleurs en
42 SDO FY13 49 Villas B Findings Contractor HSE 3-Dec-12 3-Dec-12 Closed
Fakhraddine ciblant les travailleurs en hauteur. hauteur
Chercheurs)
Thermodarias (
Yassine une copie des documents réglementaires et Fournir des copies des documents cités dans
43 SDO FY13 49 Villas I Findings Contractor HSE 3-Dec-12 3-Dec-12 Closed
Fakhraddine des habilitations absente dans chaque engin chaque engins
Chercheurs)
Thermodarias (
Yassine Equipper tous les engins par des bips de recuk
44 SDO FY13 49 Villas I Findings Absence des bips de reculs Contractor HSE 3-Dec-12 30-Dec-12 Closed
Fakhraddine et réparer ceux défaillants
Chercheurs)
Thermodarias (
Non utilsation d'échelles d'accés pour des
45 SDO FY13 49 Contractor HSE Villas C Findings Arret de l'activité et fournir échelles Contractor HSE 3-Dec-12 3-Dec-12 Closed
échaffaudage (tour d'étaiements)
Chercheurs)
Thermodarias (
Yassine Positive le rangement et le nettoyage du chantier ont
46 SDO FY13 49 Villas A 4-Dec-12
Fakhraddine Observation été maintenus
Chercheurs)
Thermodarias (
Yassine Positive au niveau des SPA, la couverture des activités
47 SDO FY13 49 Villas G 4-Dec-12
Fakhraddine Observation effectuées sur chantier s’est consolidée.
Chercheurs)
Thermodarias (
Yassine l’état des dotations EPI par ouvriers commence Contractor
48 SDO FY13 49 Villas D Findings Distribuer les EPI 4-Dec-12 30-Dec-12 Closed
Fakhraddine à tomber en désuétude. Supervisor
Chercheurs)
Thermodarias (
Yassine Travail dépassant les 1m80 d’hauteur sans Fournir aux travailleurs des harnais de sécurité Contractor
50 SDO FY13 49 Villas B Findings 4-Dec-12 4-Dec-12 Closed
Fakhraddine harnais ni gardecorps et prévoir protection collective Supervisor
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Coudeuse,cisaille et bétonniére n'ont pas de Contractor
52 SDO FY13 49 Contractor HSE Villas J Findings Prévoir des carters de protection 5-Dec-12 30-Dec-12 Closed
carter de protection Supervisor
Chercheurs)
Gregori
International ( Non port des lunettes de sécurité par un Explication à l'ouvrier sur la neccessité de
53 SDO FY13 49 Contractor HSE D Findings Contractor HSE 6-Dec-12 6-Dec-12 Closed
Aménagement ouvrier,maglrés de nombreux rappels porter des lunettes et avertissement
Ville Verte)
Gregori
Yassine International ( Positive Couverture et affichage des SPA sur des
54 SDO FY13 49 G 6-Dec-12
Fakhraddine Aménagement Observation panneaux prés des activités
Ville Verte)
Thermodarias (
Prévoir formation sur l'utilsation des harnais de
55 SDO FY13 49 Contractor HSE Villas B Findings Utiisation non conforme des harnais de sécurité Contractor HSE 7-Dec-12 30-Dec-12 Closed
sécurité ciblant tout le perssonel thermodarias
Chercheurs)
Thermodarias (
56 SDO FY13 50 Contractor HSE Villas D Findings Chef d'équipe qui travaille sans gilet de sécurité Sensibilisation et avertissement Contractor HSE 8-Dec-12 8-Dec-12 Closed
Chercheurs)
Thermodarias (
57 SDO FY13 50 Contractor HSE Villas B Findings Un maçon qui travaille en hauteur sans harnais Arret du poste,Sensibilisation et avertissement Contractor HSE 9-Dec-12 9-Dec-12 Closed
Chercheurs)
Thermodarias (
Yassine Absence de garde corps et de point d’ancrage Fournir et sensibliser les ouvriers aux port du
58 SDO FY13 50 Villas B Findings Contractor HSE 11-Dec-12 11-Dec-12 Closed
Fakhraddine solide et conforme. harnais
Chercheurs)
Thermodarias (
Yassine Baliser la zone et sensibliser le personnel aux
59 SDO FY13 50 Villas B Findings Travaux superposés Contractor HSE 11-Dec-12 11-Dec-12 Closed
Fakhraddine risques encourus lors des travaux superposés
Chercheurs)
Thermodarias (
Yassine Avertir l'entreprise et prévoir des plates formes Contractor
60 SDO FY13 50 Villas C Findings Plate forme de travail incomplète 11-Dec-12 12-Dec-12 Closed
Fakhraddine complétes sous les pieds des ouvriers Manager
Chercheurs)
Thermodarias (
Yassine Absence d’accès et d’issue sécurisés pour les Contractor
61 SDO FY13 50 Villas C Findings Avertir l'entreprise et prévoir accés conforme 11-Dec-12 28-Dec-12 Closed
Fakhraddine travaux en hauteur Manager
Chercheurs)
Thermodarias (
Yassine Demande faite a l'entreprise de se Contractor
62 SDO FY13 50 Villas D Findings Manquement au port des EPI 11-Dec-12 30-Dec-12 Closed
Fakhraddine réapprovisioner en EPI Manager
Chercheurs)
Thermodarias (
Yassine Utilisation des tours d’étaiement comme Avertir l'entreprise et prévoir échaffaudage Contractor
63 SDO FY13 50 Villas C Findings 11-Dec-12 Open
Fakhraddine échafaudage de travail. conforme Manager
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Yassine Absence d’une équipe habilitée à monter et à Former une équipe habilitée a monter les Contractor
64 SDO FY13 50 Villas C Findings 11-Dec-12 Open
Fakhraddine contrôler les échaffaudages échaffaudages. Manager
Chercheurs)
Thermodarias (
Yassine
65 SDO FY13 50 Villas C Findings Accès menant aux échaffaudages obsturés Libérer accés et passage aux échaffaudages Contractor HSE 11-Dec-12 30-Dec-12 Closed
Fakhraddine
Chercheurs)
Thermodarias (
Yassine Absence de linguet de sécurité sur trois Avertir l'entreprise sur l'état déplorable de ses Contractor
66 SDO FY13 50 Villas F Findings 11-Dec-12 30-Dec-12 Closed
Fakhraddine crochets utilisés lors des levages crochets de levage ,demande de remplacement Manager
Chercheurs)
Thermodarias (
Yassine Non port des EPI sur le chantier par deux Sensibiklsation et Veiller a une meilleure Yassine
67 SDO FY13 50 Villas D Findings 11-Dec-12 11-Dec-12 Closed
Fakhraddine ouvriers supervision de l'entreprise Fakhraddine
Chercheurs)
Thermodarias (
Un maçon qui travaille sans lunettes de
68 SDO FY13 50 Contractor HSE Villas D Findings Arret du poste,Sensibilisation et avertissement Contractor HSE 12-Dec-12 12-Dec-12 Closed
sécurité malgrés le risque de projection
Chercheurs)
STAM (
Déchets en plastique et stagnation des eaux Collecte des déchets par un agent et
69 SDO FY13 50 Contractor HSE Aménagement A Findings Contractor HSE 12-Dec-12 12-Dec-12 Closed
polluées sensibilisation
Ville Verte)
Gregori
International ( Ouvrier portant une veste au dessus de son Rappel sur la neccesité de la visibilté sur
70 SDO FY13 50 Contractor HSE D Findings Contractor HSE 12-Dec-12 12-Dec-12 Closed
Aménagement gilet chantier
Ville Verte)
Gregori
International ( Un ouvrier se tenant en hauteur sur le toit de la Arret de l'activité et sensibiliser et avertir
71 SDO FY13 50 Contractor HSE B Findings Contractor HSE 12-Dec-12 12-Dec-12 Closed
Aménagement mini pelle sans aucune protection l'ouvrier
Ville Verte)
Gregori
International ( Mécanicien en intervention sur le groupe Arret de l'activité et sensibiliser le mécanicien
72 SDO FY13 50 Contractor HSE J Findings Contractor HSE 12-Dec-12 12-Dec-12 Closed
Aménagement électrogéne moteur démarré sur les risques encourus
Ville Verte)
Gregori
Yassine International ( Approvisionnement des bouchons,balisage Contractor
73 SDO FY13 50 A Findings Protection insuffisante des fers en attente 13-Dec-12 30-Dec-12 Closed
Fakhraddine Aménagement temporaire Manager
Ville Verte)
Gregori
International ( Pelles mal rangées dans la base vie et jetées
75 SDO FY13 50 Contractor HSE A Findings Rangement de la zone et sensibilisation Contractor HSE 13-Dec-12 13-Dec-12 Closed
Aménagement par terre
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Les pierres non utilisées sont laissées sur la Evacuation du poste spécifié mais mauvaise
76 SDO FY13 50 Contractor HSE Villas B Findings Contractor HSE 14-Dec-12 14-Dec-12 Closed
platforme des échaffaudage pratique répandue sur le chantier
Chercheurs)
Thermodarias (
Un cable électrique posé par terre,sans Contractor
77 SDO FY13 50 Contractor HSE Villas L Findings Protection du cable électrique avec fourreau 14-Dec-12 14-Dec-12 Closed
protection ni gaine. Supervisor
Chercheurs)
Thermodarias (
Yassine Distribuer des EPI aux ouvriers et procéder à Yassine
78 SDO FY13 51 Villas D Findings Manquement au port des EPI par les ouvriers 18-Dec-12 18-Dec-12 Closed
Fakhraddine un meilleur suivi Fakhraddine
Chercheurs)
Thermodarias (
Yassine Travailleurs en hauteur sans aucune protection Aviser les responsables ,aucune plates formes Yassine
79 SDO FY13 51 Villas B Findings 18-Dec-12 18-Dec-12 Closed
Fakhraddine lors du bétonnage de sécurité prévue Fakhraddine
Chercheurs)
Thermodarias (
Yassine Demande faite a l'entreprise de se fournir des Yassine
80 SDO FY13 51 Villas F Findings Crochet de levage sans linguets de sécurité 18-Dec-12 30-Dec-12 Closed
Fakhraddine accésoires de levage conformes Fakhraddine
Chercheurs)
Thermodarias (
Yassine Escalade des échaffaudages par les ouvriers Yassine
81 SDO FY13 51 Villas C Findings Mise en place d'une échelles 18-Dec-12 18-Dec-12 Closed
Fakhraddine pour y accéder Fakhraddine
Chercheurs)
Thermodarias (
Yassine Mauvais rangement des outils et des planches Yassine
82 SDO FY13 51 Villas A Findings Nettoyer la zone et sensibliser les boiseurs 18-Dec-12 18-Dec-12 Closed
Fakhraddine de bois Fakhraddine
Chercheurs)
Thermodarias (
Yassine Echaffaudages mis en place en reposant sur un Aviser les responsables ,sensibiliser et former Yassine
83 SDO FY13 51 Villas C Findings 18-Dec-12 19-Dec-12 Closed
Fakhraddine tas de brique monteurs Fakhraddine
Chercheurs)
Thermodarias (
Yassine Utilisation des tours d’étaiement comme Sensibilsation des ouvriers sur les risques de Yassine
85 SDO FY13 51 Villas A Findings 19-Dec-12 19-Dec-12 Closed
Fakhraddine vestiaires trébuchements Fakhraddine
Chercheurs)
STAM (
Positive
87 SDO FY13 51 Contractor HSE Aménagement D Port des EPI par tout le personnel 20-Dec-12
Observation
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
STAM (
Yassine Manque de drapeaux de guidage pour les
88 SDO FY13 51 Aménagement I Findings Demande a l'entreprise de se fournir en drapaux Contractor HSE 20-Dec-12 30-Dec-12 Closed
Fakhraddine flagman
Ville Verte)
Thermodarias (
Yassine Au moment du levage des galets ,des ouvriers Sensibilsation des ouvriers sur les risques des
89 SDO FY13 51 Villas F Findings Contractor HSE 20-Dec-12 20-Dec-12 Closed
Fakhraddine se trouvent en dessous de la charge charges suspendues
Chercheurs)
Thermodarias (
91 SDO FY13 51 Contractor HSE Villas L Findings Cables électriques non protégés Protection des cables avec fourreau Contractor HSE 20-Dec-12 20-Dec-12 Closed
Chercheurs)
Gregori
International (
92 SDO FY13 51 Contractor HSE D Findings Ouvrier ne portant pas de lunettes Sensibilisation et avertissement Contractor HSE 20-Dec-12 20-Dec-12 Closed
Aménagement
Ville Verte)
Gregori
International (
93 SDO FY13 51 Contractor HSE D Findings Ouvrier refusant de porter des gants Sensibillisation et avertissement Contractor HSE 21-Dec-12 21-Dec-12 Closed
Aménagement
Ville Verte)
Gregori
International (
94 SDO FY13 51 Contractor HSE A Findings Outils mal rangés sur la zone de travail Nettoyer la zone et sensibliser les ouvriers Contractor HSE 21-Dec-12 21-Dec-12 Closed
Aménagement
Ville Verte)
Gregori
International ( Un gardien utilise la cloture de la base vie pour
95 SDO FY13 51 Contractor HSE A Findings Sensibilisaation du gardien Contractor HSE 21-Dec-12 21-Dec-12 Closed
Aménagement faire sécher ses vétements
Ville Verte)
Gregori
International ( Contractor
97 SDO FY13 52 Contractor HSE D Findings Ouvrier ne portant pas de lunettes Mise à pied d'un 1/2 journée vu qu'il a récidivé 22-Dec-12 22-Dec-12 Closed
Aménagement Supervisor
Ville Verte)
Gregori
International ( Positive
98 SDO FY13 52 Contractor HSE D Respect du port des EPI 22-Dec-12
Aménagement Observation
Ville Verte)
Gregori
International ( Positive Bon respect des régles et distance de sécurité
99 SDO FY13 52 Contractor HSE P 24-Dec-12
Aménagement Observation entre engin et ouvriers
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( Sensibilisation : Il faut respcter les régles de
100 SDO FY13 52 Contractor HSE D Findings Ouvrier ne portant complétement ses EPI Contractor HSE 24-Dec-12 24-Dec-12 Closed
Aménagement sécurité et réguliérement porter ses EPI
Ville Verte)
Thermodarias (
101 SDO FY13 52 Contractor HSE Villas C Findings Position incorecte des éléments d'échaffaudage Sensibilisation des monteurs Contractor HSE 25-Dec-12 25-Dec-12 Closed
Chercheurs)
Gregori
International ( Chauffeur de minipelle conduit l'engin sans L'inforrmer de ne plus conduire d'engin sans
102 SDO FY13 52 Contractor HSE I Findings Contractor HSE 25-Dec-12 25-Dec-12 Closed
Aménagement guide guide
Ville Verte)
Gregori
International (
103 SDO FY13 52 Contractor HSE D Findings L'ouvrier qui taille les arbressans gants Arrêt immédiat,l'informer et mise à pied donné Contractor HSE 25-Dec-12 25-Dec-12 Closed
Aménagement
Ville Verte)
Thermodarias (
Yassine Utilisation de briques comme éléments Arrêt du poste et sensibilisation de l’ouvrier. Yassine
105 SDO FY13 52 Villas C Findings 25-Dec-12 25-Dec-12 Closed
Fakhraddine d’élévations Fakhraddine
Chercheurs)
Sensibilisation de l’ouvrier.
Thermodarias (
Yassine Non port des EPI par un ouvrier en plein Informer les responsables des différents Yassine
106 SDO FY13 52 Villas D Findings 25-Dec-12 25-Dec-12 Closed
Fakhraddine chantier manquements. Fakhraddine
Chercheurs)
Thermodarias (
Travaux en hauteur (décoffrage) sans faire
108 SDO FY13 52 Contractor HSE Villas B Findings L'animateur HSE avertit les ouvriers Contractor HSE 26-Dec-12 26-Dec-12 Closed
attention aux autres (Travaux superposés)
Chercheurs)
Gregori
International ( Maçon a laissé sa zone du travail sans
109 SDO FY13 52 Contractor HSE A Findings Nettoyage systématique de la zone Contractor HSE 26-Dec-12 26-Dec-12 Closed
Aménagement nettoyage
Ville Verte)
Gregori
Un scorpion au dessus de la plante lors du
International ( Positive
110 SDO FY13 52 Contractor HSE D chargement, l'ouvrier portant ses gants n'a pas 26-Dec-12
Aménagement Observation
été piqué.
Ville Verte)
Thermodarias (
Travaux en hauteur (décoffrage) sans faire
111 SDO FY13 52 Contractor HSE Villas B Findings L'agent HSE avertit les ouvriers Contractor HSE 27-Dec-12 27-Dec-12 Closed
attention aux autres (Travaux superposés)
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Manque de lumieres sur une partie du chantier
112 SDO FY13 52 Contractor HSE Villas T Findings Installation d'un projecteur sur place Contractor HSE 27-Dec-12 27-Dec-12 Closed
oú les travaux sont en cours
Chercheurs)
Thermodarias (
Les ouvries cassent les pierres sans mettre les L'agent à arrete le travail et a exiger les ouvries
113 SDO FY13 52 Contractor HSE Villas D Findings Contractor HSE 27-Dec-12 27-Dec-12 Closed
lunettes de porter les lunettes
Chercheurs)
Thermodarias (
114 SDO FY13 52 Contractor HSE Villas D Findings Un ouvrier travaille dans le béton sans EPI Donner un ordre pour mettre les EPI Contractor HSE 27-Dec-12 27-Dec-12 Closed
Chercheurs)
Gregori
Arrêt immédiat de son poste,l'iinformer et lui
International ( Gardien de nuit ne porte pas ses chaussures
115 SDO FY13 52 Contractor HSE D Findings donner consigne d'aller cherché ses EPI et de Contractor HSE 27-Dec-12 27-Dec-12 Closed
Aménagement de sécurité et gant
les porter régulièrement
Ville Verte)
Gregori
International (
116 SDO FY13 52 Contractor HSE A Findings Outils mal rangés sur la zone de travail Rangement de la zone et sensibilisation Contractor HSE 27-Dec-12 27-Dec-12 Closed
Aménagement
Ville Verte)
Thermodarias (
Manque d'éclairage sur une partie du chantier Contractor
117 SDO FY13 52 Contractor HSE Villas T Findings Installation d'un projecteur sur place 28-Dec-12 28-Dec-12 Closed
oú les travaux sont en cours Supervisor
Chercheurs)
Thermodarias (
Conducteur descent de la machine en la
118 SDO FY13 52 Contractor HSE Villas I Findings Sensibilisation du conducteur Contractor HSE 28-Dec-12 28-Dec-12 Closed
laissant a marche
Chercheurs)
Thermodarias (
119 SDO FY13 52 Contractor HSE Villas D Findings Maçon travaille en hauteur sans harnais Avertissement donné au maçon Contractor HSE 28-Dec-12 28-Dec-12 Closed
Chercheurs)
Thermodarias (
120 SDO FY13 52 Contractor HSE Villas A Findings Mauvais balisage du passage d'eengins Mise en place d'un filet du balisage Contractor HSE 28-Dec-12 28-Dec-12 Closed
Chercheurs)
Thermodarias (
121 SDO FY13 52 Contractor HSE Villas A Findings Zone mal rangée Obligation de nettoyage Contractor HSE 28-Dec-12 28-Dec-12 Closed
Chercheurs)
Thermodarias (
122 SDO FY13 52 Contractor HSE Villas B Findings Travail en hauteur sans harnais Arret du poste et Sensibilisation Contractor HSE 28-Dec-12 28-Dec-12 Closed
Chercheurs)
STAM (
Yassine Positive Présence de guide avec drapeaux
123 SDO FY13 52 Aménagement I 28-Dec-12 Closed
Fakhraddine Observation accompagnant la pelle lors de son deplacement
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Arret du poste jusqu'à correction des
125 SDO FY13 1 Contractor HSE Villas C Findings Position incorecte des éléments d'échaffaudage Contractor HSE 29-Dec-12 29-Dec-12 Closed
échaffaudages
Chercheurs)
Thermodarias (
Sensibilisation de l'ouvrier et fourniture des
127 SDO FY13 1 Contractor HSE Villas B Findings Travail en hauteur sans harnais Contractor HSE 29-Dec-12 29-Dec-12 Closed
harnais
Chercheurs)
Thermodarias (
Bétonnage au moyen d'une pompe sans
128 SDO FY13 1 Contractor HSE Villas A Findings balisage de la zone Contractor HSE 29-Dec-12 29-Dec-12 Closed
balisage de la zone
Chercheurs)
Thermodarias (
Arret du poste jusqu'à mise en place des garde
129 SDO FY13 1 Contractor HSE Villas B Findings Ouvrier travaillant en hauteur sans garde corps Contractor HSE 29-Dec-12 29-Dec-12
corps
Chercheurs)
Thermodarias (
130 SDO FY13 1 Contractor HSE Villas D Findings Travailleur sans lunettes de sécurité Sensibilisation autour des EPI et leur fourniture Contractor HSE 29-Dec-12 30-Dec-12 Closed
Chercheurs)
Thermodarias (
Levage du seau de la grue au dessus des Sensibilisation du grutier et sensiblisation des
131 SDO FY13 1 Contractor HSE Villas F Findings Contractor HSE 30-Dec-12 30-Dec-12
ouvriers ouvriers de la zone
Chercheurs)
Thermodarias (
132 SDO FY13 1 Contractor HSE Villas L Findings Cable eléctriques avec domino Mise en place de boite de jonction conforme Contractor HSE 30-Dec-12
Chercheurs)
Gregori
International ( Arrêt immédiat, et affectation d'un guide pour le
133 SDO FY13 1 Contractor HSE I Findings Minipelle en travail sans guide Contractor HSE 31-Dec-12
Aménagement guidage de l'engin,
Ville Verte)
Gregori
International ( Positive Encourager les ouvrier pour leur descipline et
134 SDO FY13 1 Contractor HSE D Respect de port des EPI régulièrement 2-Jan-13
Aménagement Observation pour le respect des régles du sécurité.
Ville Verte)
Gregori
International ( Balisage de ce trou vu sa présence en pleine
135 SDO FY13 1 Contractor HSE B Findings Existence d'un trou sur la zone 5 Contractor HSE 2-Jan-13
Aménagement zone de travail
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
STAM (
Positive Equipe sur chantier utilise les EPI conforme et
136 SDO FY13 1 Contractor HSE Aménagement D Des flag Rouge et vert pour un bon guidage 3-Jan-13
Observation un bon guidage de l'engin .
Ville Verte)
Gregori
International ( Sensibilisation avant de prendre une mesure
137 SDO FY13 1 Contractor HSE D Findings Non respect du port des gants Contractor HSE 3-Jan-13
Aménagement disciplinaire
Ville Verte)
Gregori
International ( Positive
139 SDO FY13 1 Contractor HSE D Respect régulier du port des EPI 4-Jan-13
Aménagement Observation
Ville Verte)
Thermodarias ( Risque imminent de chute en hauteur pour des Arret des postes concernés et demande a
Yassine Yassine
140 SDO FY13 1 Villas B Findings ouvriers travaillant sans aucune protection l'entreprise de prévoir protection collective et 3-Jan-13 3-Jan-13 Closed
Fakhraddine Fakhraddine
Chercheurs) collective ni individuelle. individuelle
Thermodarias (
Yassine Accès non conformes et mal conçus donnant Conceptions d'accés conformes donnant aux Contractor
141 SDO FY13 1 Villas C Findings 3-Jan-13 3-Jan-13 Closed
Fakhraddine sur les planchers d’échafaudages échaffaudages Supervisor
Chercheurs)
Thermodarias (
Yassine Contractor
143 SDO FY13 1 Villas B Findings Escalier sans main courante Mise en place de gardes corps 3-Jan-13 3-Jan-13 Closed
Fakhraddine Supervisor
Chercheurs)
Thermodarias (
Yassine Yassine
144 SDO FY13 1 Villas B Findings Passerelle sommaire sans garde-corps Destruction de la passerelle et sensibilisation 3-Jan-13 3-Jan-13 Closed
Fakhraddine Fakhraddine
Chercheurs)
Manquement au niveau des ports d’EPI
Thermodarias ( (Chaussures de villes, absence de gants et de
Yassine Management de l'entreprise soustraitante Contractor
145 SDO FY13 1 Villas D Findings lunettes de sécurité chez certains ouvriers et 3-Jan-13 3-Jan-13 Closed
Fakhraddine informé pour action rapide et efficace Supervisor
Chercheurs) travailleur opérant à la meule sans utilisation
de masque facial)
Absence de linguet de sécurité sur des
Thermodarias ( Sensibilisation du grutier et des chefs de
Yassine crochets utilisés lors des levages, une non- Contractor
146 SDO FY13 1 Villas F Findings chantier.Demande faite a l'entreprise de se 3-Jan-13 30-Jan-13 Closed
Fakhraddine conformité qui implique un risque imminent de Supervisor
Chercheurs) fournir urgement en linguet de sécurité
chute/Renversement de la charge.
Thermodarias (
Yassine Mauvais rangement dans une zone de travail, Yassine
147 SDO FY13 1 Villas A Findings Rangement de la zone et sensibilisation 3-Jan-13 3-Jan-13 Closed
Fakhraddine risque de trébuchement. Fakhraddine
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( Positive Encourager les ouvrier pour leur descipline et
148 SDO FY12 1 Contractor HSE D Respect du port des EPI 5-Jan-13
Aménagement Observation pour le respect des régles du sécurité.
Ville Verte)
Thermodarias (
Sensibilisation de l'ouvrier et fourniture des
151 SDO FY13 2 Contractor HSE Villas B Findings Travail en hauteur sans utilisation d'harnais Contractor HSE 5-Jan-13 5-Jan-13 Closed
harnais
Chercheurs)
Gregori
International ( Positive
152 SDO FY13 2 Contractor HSE I Minipelle munie de nouveaux rétroviseurs 7-Jan-13
Aménagement Observation
Ville Verte)
Thermodarias (
Travaux en hauteur sans mise en place de Arret du poste jusqu'à mise en place des garde Contractor
153 SDO FY13 2 Contractor HSE Villas B Findings 7-Jan-13 7-Jan-13 Closed
protection collective corps Supervisor
Chercheurs)
Thermodarias (
154 SDO FY13 2 Contractor HSE Villas D Findings Travailleur sans lunettes de sécurité Sensibilisation autour des EPI et leur fourniture Contractor HSE 7-Jan-13 7-Jan-13 Closed
Chercheurs)
Thermodarias (
Yassine Absence de linguet de sécurité sur un crochet Arrêt de l'activité de la grue jusqu'à correction
155 SDO FY13 2 Villas F Findings Contractor HSE 7-Jan-13 30-Jan-13 Closed
Fakhraddine d'une grue à tour de l'anomalie
Chercheurs)
Thermodarias (
Yassine Manquement au niveau des ports d’EPI Management de l'entreprise soustraitante Contractor
156 SDO FY13 2 Villas D Findings 7-Jan-13 8-Jan-13 Closed
Fakhraddine (Chaussures de villes en pleins chantier) informé pour action rapide et efficace Supervisor
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Sensibilisation de l'ouvrier autour des dangers
160 SDO FY13 2 Contractor HSE Villas F Findings Ouvrier voulant monter dans un sceau à béton Contractor HSE 8-Jan-13 8-Jan-13 Closed
de ce genre de pratique
Chercheurs)
STAM (
161 SDO FY13 2 Contractor HSE Aménagement M Findings Manque d'exctincteurs dans les engins Commande de nouveaux extincteurs Contractor HSE 9-Jan-13 30-Jan-13 Closed
Ville Verte)
Thermodarias (
163 SDO FY13 2 Contractor HSE Villas C Findings Esclade d'un échaffaudage par un ouvrier Sensibiilsation de l'ouvrier Contractor HSE 9-Jan-13 9-Jan-13 Closed
Chercheurs)
Gregori
International (
164 SDO FY13 2 Contractor HSE D Findings Trois ouvrierS portent des gants non conformes Changement des gants immédiat Contractor HSE 11-Jan-13 11-Jan-13 Closed
Aménagement
Ville Verte)
STAM (
Manque constaté concernant le port EPI ,
166 SDO FY13 3 Contractor HSE Aménagement D Findings Commande passée au siége de l'entreprise Contractor HSE 12-Jan-13 13-Jan-13 Closed
chaussures, gillet , lunettes et gants de sécurité
Ville Verte)
Thermodarias (
Sensibliser le maçon et remise d'un harnais à
167 SDO FY13 3 Contractor HSE Villas B Findings Travail en hauteur sans utilisation d'harnais Contractor HSE 13-Jan-13 13-Jan-13 Closed
l'ouvrier conçerné
Chercheurs)
Thermodarias (
Travaux en hauteur (décoffrage) en ayant des
168 SDO FY13 3 Contractor HSE Villas B Findings Sensibiliser les ouvriers et baliser la zone Contractor HSE 13-Jan-13 13-Jan-13 Closed
travaux superposés
Chercheurs)
Thermodarias (
169 SDO FY13 3 Contractor HSE Villas C Findings Montage d’échafaudages non conformes Mise en conformité de l'échaffaudage Contractor HSE 13-Jan-13 13-Jan-13 Closed
Chercheurs)
Thermodarias (
Travail en hauteur sans mise en place de garde Contractor
170 SDO FY13 3 Contractor HSE Villas B Findings Mise en place de protection collective 13-Jan-13 13-Jan-13 Closed
corps ou de toute protection collective Supervisor
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( Arrêt immédiat du poste ,sensibilisation de
172 SDO FY13 3 Contractor HSE D Findings Port de gants non conformes Contractor HSE 15-Jan-13 15-Jan-13 Closed
Aménagement l'ouvrier et changement des gants
Ville Verte)
Envoi des Bennes à béton à l’atelier pour
Thermodarias (
Yassine réparation Contractor
173 SDO FY13 3 Villas F Findings Volant de la benne à béton défectueux 15-Jan-13 30-Jan-13 Closed
Fakhraddine Procéder systématiquement à une vérification Supervisor
Chercheurs)
des bennes à bétons
Sensibiliser les ouvriers sur le risque de
Thermodarias ( trébuchement et les moyens de le prévenir
Yassine
174 SDO FY13 3 Villas A Findings Passage obstrué par un mauvais rangement Maintenir des accès conformes et libérés. Contractor HSE 15-Jan-13 15-Jan-13 Closed
Fakhraddine
Chercheurs)
Thermodarias (
Yassine Démontage immédiat de la tour posée sur une Contractor
176 SDO FY13 3 Villas C Findings Montage d’échafaudages non conformes 15-Jan-13 15-Jan-13 Closed
Fakhraddine chute de béton. Supervisor
Chercheurs)
Thermodarias (
Escalade de la tour d'étaiement au lieu
179 SDO FY13 3 Contractor HSE Villas C Findings Sensibilsation de l'ouvrier Contractor HSE 15-Jan-13 15-Jan-13 Closed
d'utiliser une échelle
Chercheurs)
Gregori
International ( Positive Respect du port des EPI par une équipe toute Encourager les ouvrier pour leur descipline et
180 SDO FY13 3 Contractor HSE D 17-Jan-13
Aménagement Observation entiére pour le respect des régles du sécurité.
Ville Verte)
Gregori
International ( Contractor
182 SDO FY13 4 Contractor HSE T Findings Le vent soufflant très fort Suspension de travail jusqu'à nouvel ordre 19-Jan-13 19-Jan-13 Closed
Aménagement Supervisor
Ville Verte)
Gregori
International ( Contractor
183 SDO FY13 4 Contractor HSE A Findings ¨Pelle jetée en pleine zone de travail Arrêt immédiat et rangement de la zone 21-Jan-13 21-Jan-13 Closed
Aménagement Supervisor
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( Respect du port des EPI par des chefs
184 SDO FY13 4 Contractor HSE D Positive Observation Contractor HSE 21-Jan-13
Aménagement d'équipes et par l'encadrement
Ville Verte)
Gregori
International (
185 SDO FY13 4 Contractor HSE D Findings Port de gants non conforme Changement immédiat des gants Contractor HSE 22-Jan-13 22-Jan-13 Closed
Aménagement
Ville Verte)
Gregori
International ( Positive
186 SDO FY13 4 Contractor HSE D Respect de port des EPI une équipe entiére 22-Jan-13
Aménagement Observation
Ville Verte)
Gregori
International ( Aucun respect du port des gants par des Sensibilisation des ouvriers et distribution de
187 SDO FY13 4 Contractor HSE D Findings Contractor HSE 22-Jan-13 22-Jan-13 Closed
Aménagement ouvriers gants
Ville Verte)
Thermodarias (
Contractor
188 SDO FY13 5 Contractor HSE Villas C Findings Position incorrecte d'échaffaudage Mise en place correcte des échaffaudages 26-Jan-13 26-Jan-13 Closed
Supervisor
Chercheurs)
Thermodarias (
Contractor
189 SDO FY13 5 Contractor HSE Villas B Findings Travaux en hauteur (décoffrage) sans harnais L'agent avertit l'ouvrier et fourniture d'un harnais 26-Jan-13 26-Jan-13 Closed
Supervisor
Chercheurs)
Thermodarias (
Travail en hauteur sans mise en place de garde Mise en place correcte des gardes corps Contractor
190 SDO FY13 5 Contractor HSE Villas B Findings 26-Jan-13 26-Jan-13 Closed
corps adéquats Supervisor
Chercheurs)
Thermodarias (
avertissement et sensibilisation par l'
191 SDO FY13 5 Contractor HSE Villas D Findings Travail en hauteur sans casque Contractor HSE 27-Jan-13 27-Jan-13 Closed
animateur HSE
Chercheurs)
Thermodarias (
avertissement et sensibilisation par l'
192 SDO FY13 5 Contractor HSE Villas B Findings Travail en hauteur sans gards corps ni harnais Contractor HSE 27-Jan-13 27-Jan-13 Closed
animateur HSE
Chercheurs)
Thermodarias (
193 SDO FY13 5 Contractor HSE Villas B Findings Travail en hauteur sans harnais L'agent avertit l'ouvrier et fourniture d'un harnais Contractor HSE 27-Jan-13 27-Jan-13 Closed
Chercheurs)
Thermodarias (
194 SDO FY13 5 Contractor HSE Villas C Findings Escalade des élement de l'échafaudage Sensibilisation par l' animateur HSE Contractor HSE 28-Jan-13 28-Jan-13 Closed
Chercheurs)
Thermodarias (
195 SDO FY13 5 Contractor HSE Villas B Findings Maçon travail en hauteur sans harnais Sensibilisation+avertissement Contractor HSE 28-Jan-13 28-Jan-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Approvisionnement des panneaux de
STAM (
Positive signalisation , et fixation dans la zone des Contractor
196 SDO FY13 5 Contractor HSE Aménagement D 28-Jan-13 28-Jan-13
Observation travaux et au pistes du chantier ,et a cote de la Supervisor
Ville Verte)
porte ,et a coté du citerne du gasoial
Thermodarias (
Avertissement par l'agent et sensibilisation sur
197 SDO FY13 5 Contractor HSE Villas D Findings Travail en hauteur sans casque Contractor HSE 29-Jan-13 29-Jan-13 Closed
l'importance du port des EPI
Chercheurs)
Thermodarias (
Avertissement par l'agent et sensibilisation sur
198 SDO FY13 5 Contractor HSE Villas D Findings Tailleur de piérre sans lunettes Contractor HSE 29-Jan-13 29-Jan-13 Closed
l'importance du port des EPI
Chercheurs)
Thermodarias (
Arret du poste concerné et demande de
199 SDO FY13 5 Contractor HSE Villas B Findings travail en hauteur sans harnais Contractor HSE 29-Jan-13 29-Jan-13 Closed
prévoir protection collective et individuelle
Chercheurs)
Thermodarias (
Contractor
200 SDO FY13 5 Contractor HSE Villas B Findings Travail en hauteur sans gard corp Mise en place correcte des gards corps 30-Jan-13 30-Jan-13 Closed
Supervisor
Chercheurs)
Thermodarias (
201 SDO FY13 5 Contractor HSE Villas D Findings Tailleur de piérre sans lunettes Sensibilisation par l'agent Contractor HSE 30-Jan-13 30-Jan-13 Closed
Chercheurs)
Thermodarias (
Fourniture de chaussures de sécurité à l'ouvrier
202 SDO FY13 5 Contractor HSE Villas D Findings Travailleur sans chaussures sécurité Contractor HSE 30-Jan-13 30-Jan-13 Closed
concerné
Chercheurs)
Thermodarias (
Correction en ajoutant des madriers et
205 SDO FY13 5 Contractor HSE Villas C Findings Plate forme d'echafaudage inccorrecte Contractor HSE 1-Feb-13 1-Feb-13 Closed
sensibilisation par l'agent
Chercheurs)
Thermodarias (
Des zones de travail sans nettoyage et avec
206 SDO FY13 5 Contractor HSE Villas A Findings Sensibilisation par le responsable HSE Contractor HSE 1-Feb-13 1-Feb-13 Closed
présence des madriers
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
208 SDO FY13 Contractor HSE Villas C Findings Position des éléments d'échaffaudage incorecte Mise en place correcte des échaffaudages Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
209 SDO FY14 Contractor HSE Villas B Findings Travaux en hauteur (décoffrage) sans harnais SENSIBILISATION Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
210 SDO FY15 Contractor HSE Villas B Findings Travail en hauteur sans garde corps mise en place correcte Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
211 SDO FY16 Contractor HSE Villas D Findings Travail en hauteur sans casque avertissement par l'agent Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
212 SDO FY17 Contractor HSE Villas B Findings travail en hauteur sans garde corps ni harnais SENSIBILISATION PAR L'agent Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
213 SDO FY18 Contractor HSE Villas B Findings Travail en hauteur sans harnais Sensibilisation Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
214 SDO FY19 Contractor HSE Villas C Findings Escalade d'un echafaudage l'agent avertit l'ouvrier Contractor HSE 5-Feb-13 5-Feb-13 Closed
Chercheurs)
Thermodarias (
215 SDO FY20 Contractor HSE Villas D Findings Travail en hauteur sans casque Avertissement par l'agent Contractor HSE 6-Feb-13 6-Feb-13 Closed
Chercheurs)
Thermodarias (
217 SDO FY13 Contractor HSE Villas D Findings Tailleur de pierre sans lunettes avertissement par l'agent Contractor HSE 8-Feb-13 8-Feb-13 Closed
Chercheurs)
Thermodarias (
218 SDO FY13 Contractor HSE Villas D Findings Travail sans chaussures sécurité avertissement par l'agent Contractor HSE 8-Feb-13 8-Feb-13 Closed
Chercheurs)
Thermodarias (
219 SDO FY13 Contractor HSE Villas C Findings Plate forme d'echafaudage incorrecte Sensibilisation par l'agent Contractor HSE 8-Feb-13 8-Feb-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
nettoyage de la zone 45 par l équipes de
220 SDO FY13 Contractor HSE Villas A Findings Des zones de travail sans nettoyage Contractor HSE 8-Feb-13 8-Feb-13 Closed
nettoyage
Chercheurs)
Plusieurs excavations sans aucune protection
Thermodarias ( ni signalisation. Ouvriers obligés d’y sauter et
Yassine Fourniture d’accès conformes et mise en place
221 SDO FY13 Villas E Findings d’escalader les parois pour y accéder et en Contractor HSE 4-Feb-13 27-Feb-13 Closed
Fakhraddine de protections aux bords des fouilles.
Chercheurs) sortir. Il y’a eu arrêt de ces postes jusqu'à
correction des non conformités
Thermodarias (
Yassine
222 SDO FY13 Villas D Findings Manquement au niveau du port des EPI Doter les ouvriers de tous les EPI necessaires Contractor HSE 4-Feb-13 5-Feb-13 Closed
Fakhraddine
Chercheurs)
Thermodarias (
Yassine Engins de chantier sans rétroviseurs gauche ni Remise en place des rétroviseurs et mise en
224 SDO FY13 Villas I Findings Contractor HSE 4-Feb-13 27-Feb-13 Closed
Fakhraddine droit et absence de gyrophare. place du gyrophare
Chercheurs)
Plates formes de travail en hauteur non
Thermodarias ( conformes ( Absence et manquement des
Yassine Mise en conformité des plates formes de travail
225 SDO FY13 Villas C Findings protections collectives et individuelles contre le Contractor HSE 4-Feb-13 27-Feb-13 Closed
Fakhraddine en hauteur
Chercheurs) risque de chute en hauteur, absence d’échelles
conformes pour y accéder et ouvriers obligés
La nécessité d’avoir un Flagman (Guide
Thermodarias (
Yassine d’engin muni de drapeaux) à l’intersection de Affectation d'un flagman et mise en place d'un
226 SDO FY13 Villas I Findings Contractor HSE 4-Feb-13 4-Feb-13 Closed
Fakhraddine votre zone de bétonnière et le passage passage à piéton
Chercheurs)
emprunté par les ouvriers.
il y’a un effort à fournir concernant le volet
Thermodarias ( balisage et délimitations des zones de
Yassine
227 SDO FY13 Villas A Findings stockage et en termes d’affichage de Balisage mis en place. Contractor HSE 4-Feb-13 4-Feb-13 Closed
Fakhraddine
Chercheurs) sensibilisation.
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Yassine EMB ( Villas Positive Bon stockage des madriers malgré l’absence
234 SDO FY13 A 8-Feb-13
Fakhraddine Margeurite) Observation de la délimitation de la zone par du balisage.
STAM (
Mecanicien,lors des reparations mécanique,ne Commande de gants adaptés aux
236 SDO FY13 7 Contractor HSE Aménagement D Findings Contractor HSE 13-Feb-13 13-Feb-13 Closed
porte pas de gants manipulations mécaniques .
Ville Verte)
STAM (
Degagement important de poussiéres : Pistes Commande de citerne pour arrosage reguliers Contractor
237 SDO FY13 7 Contractor HSE Aménagement T Findings 14-Feb-13 14-Feb-13 Closed
principales non arrosées des pistes Supervisor
Ville Verte)
Thermodarias (
Travaux en hauteur (décoffrage) sans utilsation Avertissement par l'animateur HSE et fourniture
239 SDO FY13 7 Contractor HSE Villas B Findings Contractor HSE 9-Feb-13 9-Feb-13 Closed
d'harnais d'harnais
Chercheurs)
Thermodarias (
Travaux en hauteur sans mise en place de Contractor
240 SDO FY13 7 Contractor HSE Villas B Findings Mise en place correcte des gardes corps 10-Feb-13 10-Feb-13 Closed
garde corps Supervisor
Chercheurs)
Thermodarias (
L'animateur HSE avertit le ferailleur afin qu'il
241 SDO FY13 7 Contractor HSE Villas B Findings Travail en hauteur sans harnais Contractor HSE 11-Feb-13 11-Feb-13 Closed
mette harnais
Chercheurs)
Thermodarias (
242 SDO FY13 7 Contractor HSE Villas A Findings Mauvais nettoyage et ramassage des madriers Avertissement par le responsable HSE Contractor HSE 11-Feb-13 11-Feb-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
244 SDO FY13 7 Contractor HSE Villas F Findings Charge suspendue au dessus des ouvriers Sensibilisation du grutier Contractor HSE 13-Feb-13 13-Feb-13 Closed
Chercheurs)
Thermodarias (
245 SDO FY13 7 Contractor HSE Villas D Findings Tailleur de pierres sans lunettes de sécurité Avertissement par l'animateur HSE Contractor HSE 13-Feb-13 13-Feb-13 Closed
Chercheurs)
Thermodarias (
Travaux en hauteur sans mise en place de Contractor
246 SDO FY13 7 Contractor HSE Villas B Findings Mise en place correcte des gards corps 13-Feb-13 13-Feb-13 Closed
garde corps Supervisor
Chercheurs)
Thermodarias (
247 SDO FY13 7 Contractor HSE Villas D Findings Travail sans chaussures de sécurité Avertissement par l'animateur HSE Contractor HSE 14-Feb-13 14-Feb-13 Closed
Chercheurs)
Thermodarias (
248 SDO FY13 7 Contractor HSE Villas C Findings Plate forme d'echafaudage inccorrecte Sensibilisation par l'animateur HSE Contractor HSE 14-Feb-13 14-Feb-13 Closed
Chercheurs)
Thermodarias (
249 SDO FY13 7 Contractor HSE Villas D Findings Conducteur d'engin sans EPI Avertissement et sensibilisation Contractor HSE 15-Feb-13 15-Feb-13 Closed
Chercheurs)
Thermodarias (
Yassine Alerte au niveau des chaussures et des gants. Contractor
250 SDO FY13 7 Villas D Findings Doter les ouvriers de tous les EPI necessaires 13-Feb-13 13-Feb-13 Closed
Fakhraddine les EPI sont dans leur intégralité non conforme. Supervisor
Chercheurs)
STAM (
Positive
255 SDO FY13 8 Contractor HSE Aménagement I Reparation de rétroviseurs de la pelle 16-Feb-12
Observation
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
STAM (
Aide mecanicien n'utilise pas de gants de Sensibilisation de l'equipe des mecaniciens sur
256 SDO FY13 8 Contractor HSE Aménagement D Findings Contractor HSE 16-Feb-12 16-Feb-12 Closed
sécurité le port des EPI
Ville Verte)
EMB ( Villas
257 SDO FY13 8 Contractor HSE A Findings Zone non balisée Balliser la zone par du filet avertisseur Contractor HSE 18-Feb-13 18-Feb-13 Closed
Margeurite)
Gregori
International (
258 SDO FY13 8 Contractor HSE A Findings Trous non Balisée sur site Balisage tous les trous qui posent problème Contractor HSE 19-Feb-13 19-Feb-13 Closed
Aménagement
Ville Verte)
Gregori
International ( L'existance de déchets ramenés par le vent dans
259 SDO FY13 8 Contractor HSE A Findings Netoyage de chantier Contractor HSE 20-Feb-13 20-Feb-13 Closed
Aménagement le site
Ville Verte)
Gregori
International (
260 SDO FY13 8 Contractor HSE D Findings Deux ouvriers ne portent pas les gants Sensibilisation et avertissement Contractor HSE 20-Feb-13 20-Feb-13 Closed
Aménagement
Ville Verte)
Gregori
International (
261 SDO FY13 8 Contractor HSE A Findings Matériel de travail sur chemin de passage Sensenbilisation sur le rangement et le nettoyage Contractor HSE 20-Feb-13 20-Feb-13 Closed
Aménagement
Ville Verte)
EMB ( Villas
262 SDO FY13 8 Contractor HSE L Findings Meuleuse avec câble abimé Changer le câble défectueux Contractor HSE 20-Feb-13 20-Feb-13 Closed
Margeurite)
Gregori
International (
263 SDO FY13 8 Contractor HSE D Findings Ouvrier ne porte pas son gilet Mise à pied 1/2 journé Contractor HSE 20-Feb-13 20-Feb-13 Closed
Aménagement
Ville Verte)
Gregori
International (
264 SDO FY13 8 Contractor HSE D Findings Ouvrier porte des chaussure non conformes Avertissement de l'ouvrier Contractor HSE 21-Feb-13 21-Feb-13 Closed
Aménagement
Ville Verte)
Gregori Petit engin Dumper entre une parcelle ou
plusieur ouvriers y travaillent Interdiction de faire entrer l'engin dans les petites
International (
265 SDO FY13 8 Contractor HSE I Findings parcelle de travail, ou il y a grande concentration Contractor HSE 21-Feb-13 21-Feb-13 Closed
Aménagement
d'ouvrier
Ville Verte)
STAM (
Gyrophares en panne concernant le Dumper et
266 SDO FY13 8 Contractor HSE Aménagement I Findings Commande de nouveau gyrophare Contractor HSE 21-Feb-13 27-Feb-13 Closed
compacteur
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
Yassine International ( Positive
269 SDO FY13 8 D Port des EPI 20-Feb-13
Fakhraddine Aménagement Observation
Ville Verte)
Gregori
Yassine International ( Positive
270 SDO FY13 8 G Affichage des SPA 20-Feb-13
Fakhraddine Aménagement Observation
Ville Verte)
STAM (
Yassine Positive
271 SDO FY13 8 Aménagement I l’arrosage des pistes 20-Feb-13
Fakhraddine Observation
Ville Verte)
Yassine EMB ( Villas Positive Filet avertisseur pour délimiter les différentes
274 SDO FY13 8 A 21-Feb-13
Fakhraddine Margeurite) Observation zones EMB.
STAM (
Yassine Positive Affichage des SPA GRTP dûment remplis et
275 SDO FY13 8 Aménagement G 21-Feb-13
Fakhraddine Observation signés par les ouvriers concernés par l’activité
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Pour la mise en conformité ,il faut vérfier :
Des armoires électriques non conformes (non Etanchéité des armoires, Etanchéité des prises,
Yassine EMB ( Villas
280 SDO FY13 8 L Findings mises en marche ) ont été aperçues stockées Pictogramme de Sécurité, Mise à la terre,les Contractor HSE 20-Feb-13 27-Feb-13 Closed
Fakhraddine Margeurite)
sur le chantier des Villas Marguerite. équiper de disjoncteur différentiel adéquat,
Verrouillage….
Thermodarias (
289 SDO FY13 9 Contractor HSE Villas C Findings Position des éléments d'échaffaudage incorecte Mise en place correcte de l'échafaudage Contractor HSE 23-Feb-13 23-Feb-13 Closed
Chercheurs)
Thermodarias (
290 SDO FY13 9 Contractor HSE Villas B Findings Travaux en hauteur (décoffrage) sans harnais Sensibilisation + Avertissement Contractor HSE 23-Feb-13 23-Feb-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
292 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans harnais Avertissement par l'agent Contractor HSE 25-Feb-13 25-Feb-13 Closed
Chercheurs)
Thermodarias (
Contractor
293 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans garde-corps Mise en place correcte 25-Feb-13 25-Feb-13 Closed
Supervisor
Chercheurs)
Gregori
International (
294 SDO FY13 9 Contractor HSE D Findings Ouvrier ne portant aucun EPI Re-informer de l'importance du port des EPI,. Contractor HSE 25-Feb-13 25-Feb-13 Closed
Aménagement
Ville Verte)
Gregori
Arrêt immédiat, et les sensibiliser qu'il faut
International ( Engin en marche dans une zone dense de
295 SDO FY13 9 Contractor HSE I Findings respecter la distance de sécurité entre engins et Contractor HSE 25-Feb-13 25-Feb-13 Closed
Aménagement travailleurs
ouvrier
Ville Verte)
Chef de chantier qui fait la distribution du gazoil J'ai sensibilisé le perssonel sur l'utilisation des
GRTP ( Villas
296 SDO FY13 9 Contractor HSE H Findings par le godet du chargeuse a cause du manque engins et demandé a la direction une pompe pour Contractor HSE 25-Feb-13 25-Feb-13 Closed
Marguerite)
de formation et ressources distribution de gazoil
Thermodarias (
298 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans harnais l'agent avertit le ferailleur de mettre son harnais Contractor HSE 26-Feb-13 26-Feb-13 Closed
Chercheurs)
Thermodarias (
299 SDO FY13 9 Contractor HSE Villas D Findings Travail en hauteur sans casque avertissement par l'agent Contractor HSE 26-Feb-13 26-Feb-13 Closed
Chercheurs)
Gregori
International ( Positive
300 SDO FY13 9 Contractor HSE D Bon port des EPI de la part de l'équipe Les encourager 26-Feb-13
Aménagement Observation
Ville Verte)
Thermodarias (
301 SDO FY13 9 Contractor HSE Villas B Findings travail en hauteur sans Gard corps ni harnais sensibilisation par l'agent Contractor HSE 27-Feb-13 27-Feb-13 Closed
Chercheurs)
Thermodarias (
302 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans harnais Sensibilisation Contractor HSE 27-Feb-13 27-Feb-13 Closed
Chercheurs)
Thermodarias (
303 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans garde corps sensibilisation et formation Contractor HSE 27-Feb-13 27-Feb-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International (
304 SDO FY13 9 Contractor HSE D Findings Gants non conformes Gants changés Contractor HSE 27-Feb-13 27-Feb-13 Closed
Aménagement
Ville Verte)
Thermodarias (
307 SDO FY13 9 Contractor HSE Villas B Findings Maçon travaille en hauteur sans harnais sensibilisation+avertissement Contractor HSE 28-Feb-13 28-Feb-13 Closed
Chercheurs)
Thermodarias (
308 SDO FY13 9 Contractor HSE Villas D Findings Travail en hauteur sans casque Avertissement par l'agent Contractor HSE 28-Feb-13
Chercheurs)
Thermodarias (
309 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans harnais avertissement par l'agent Contractor HSE 28-Feb-13 28-Feb-13 Closed
Chercheurs)
Thermodarias (
310 SDO FY13 9 Contractor HSE Villas D Findings Travail sans chaussures de sécurité avertissement par l'agent Contractor HSE 28-Feb-13 28-Feb-13 Closed
Chercheurs)
Thermodarias (
311 SDO FY13 9 Contractor HSE Villas B Findings Travail en hauteur sans gardes-corps mise en place correcte des gards corps Contractor HSE 1-Mar-13 1-Mar-13 Closed
Chercheurs)
Thermodarias (
312 SDO FY13 9 Contractor HSE Villas D Findings Tailleur de pierre sans lunettes Sensibilisation par l'agent Contractor HSE 1-Mar-13 1-Mar-13 Closed
Chercheurs)
Thermodarias (
313 SDO FY13 9 Contractor HSE Villas D Findings Travail sans chaussures sécurité avertissement par l'agent Contractor HSE 1-Mar-13 1-Mar-13 Closed
Chercheurs)
Thermodarias (
314 SDO FY13 9 Contractor HSE Villas C Findings Plate forme d'echafaudage inccorrecte Sensibilisation par l'agent Contractor HSE 1-Mar-13 1-Mar-13 Closed
Chercheurs)
Thermodarias (
315 SDO FY13 9 Contractor HSE Villas A Findings Des zones sans nettoyage des madriers nettoyage de la zone 45 par l équipe de nettoyage Contractor HSE 1-Mar-13 1-Mar-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
EMB ( Villas Mettre en place gaines de protection pour les Doit étre remplacé automatiquement par des
316 SOR FY13 9 Benamar L Findings Contractor HSE 27-Feb-13 27-Feb-13 Closed
Margeurite) câbles électriques câbles conformes
Yassine EMB ( Villas Madriers posés sur aglos pour servir Arret immediat de l'activité en question et mise
320 SDO FY13 9 C Findings Contractor HSE 1-Mar-13 1-Mar-13 Closed
Fakhraddine Margeurite) d'échaffaudage en place d'un échaffaudage
Yassine EMB ( Villas Pas de présence d'interlocuteur HSE lors des Informer les responsables de l'entreprise de
322 SDO FY13 9 G Findings Contractor HSE 1-Mar-13 1-Mar-13 Closed
Fakhraddine Margeurite) début des travaux grand manquement
Yassine GRTP ( Villas Positive Affichage des SPA GRTP dûment remplis et
324 SDO FY13 9 G 1-Mar-13
Fakhraddine Marguerite) Observation signés par les ouvriers concernés par l’activité
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( Arrêt immédiat et les faire mettre à pied 1/2
330 SDO FY13 10 Contractor HSE D Findings Port de gants non conforme Contractor HSE 7-Mar-13 7-Mar-13 Closed
Aménagement journée,
Ville Verte)
Gregori
International (
331 SDO FY13 10 Contractor HSE G Findings Travailleur isolé C'est les derniers avertissements Contractor HSE 7-Mar-13 7-Mar-13 Closed
Aménagement
Ville Verte)
Gregori Noveaux conducteurs d'engins de location sans
International ( EPI
332 SDO FY13 10 Contractor HSE D Findings Leur donner les EPI immédiatemment Contractor HSE 7-Mar-13 7-Mar-13 Closed
Aménagement
Ville Verte)
La réactivité et les améliorations apportées (
Yassine EMB ( Villas Positive Etanchéité des armoires, Etanchéité des prises,
333 SDO FY13 10 L Branchement de mise à la terre, Verrouillage de 7-Mar-13
Fakhraddine Margeurite) Observation
vos armoires ) AUX installations électriques
Les équipes THERMODARIAS ont commencé à
Thermodarias ( implanter des protections collectives sur UNE
Yassine Positive
334 SDO FY13 10 Villas B villa contre les chutes en hauteur. 7-Mar-13
Fakhraddine Observation
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori Un vihicule sans extincteur Intervenir pour le problème soit réglé
International (
340 SDO FY13 11 Contractor HSE I Findings Contractor HSE 12-Mar-13 12-Mar-13 Closed
Aménagement
Ville Verte)
Gregori Quelques zones ne sont pas sécurisées par du le problème a été réglé rapidement
International ( balisage
341 SDO FY13 11 Contractor HSE A Findings Contractor HSE 12-Mar-13 12-Mar-13 Closed
Aménagement
Ville Verte)
Gregori Y a le respect au niveau du port des EPI, Rien a sgnaler
International ( Positive
342 SDO FY13 11 Contractor HSE D 12-Mar-13
Aménagement Observation
Ville Verte)
Gregori La vitesse qui est limité à 20km/h n'est Le conducteur a été préenu et avertis
International ( pratiquement pas respecté,
343 SDO FY13 11 Contractor HSE H Findings Contractor HSE 12-Mar-13 12-Mar-13 Closed
Aménagement
Ville Verte)
Gregori Présence de quelques bidons de gazoil dans la On a intervenu et les problèmes sont aussitôt
International ( zone de travail, et le vihicule de location qui ne réglés
344 SDO FY13 11 Contractor HSE H Findings Contractor HSE 12-Mar-13 12-Mar-13 Closed
Aménagement dispose pas d'essuie-glasses
Ville Verte)
Tailleur de piérre sans lunettes Sensibilisation par l'agent
Thermodarias (
345 SDO FY13 11 Contractor HSE Villas D Findings Contractor HSE 12-Mar-13 12-Mar-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
zone non balisée baliser la zone
EMB ( Villas
352 SDO FY13 11 Contractor HSE A Findings Contractor HSE 14-Mar-13 14-Mar-13 Closed
Margeurite)
utilisation d'une chaine de levage sans linget de changement de la chaine par une autre conforme
EMB ( Villas sécurité
355 SDO FY13 11 Contractor HSE F Findings Contractor HSE 15-Mar-13 15-Mar-13 Closed
Margeurite)
utilisation d'une chaine de levage sans linget de changement de la chaine par une autre conforme
EMB ( Villas sécurité
357 SDO FY13 11 Contractor HSE F Findings Contractor HSE 15-Mar-13 15-Mar-13 Closed
Margeurite)
maçon travail en hauteur sans harnais l'agent avertie l’ouvrier de placer les garde corps
Thermodarias (
363 SDO FY13 11 Contractor HSE Villas B Findings Contractor HSE 15-Mar-13 15-Mar-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Travail en hauteur sans casque Avertissement par l'agent
Thermodarias (
364 SDO FY13 11 Contractor HSE Villas D Findings Contractor HSE 15-Mar-13 15-Mar-13 Closed
Chercheurs)
Travail en hauteur sans harnais l'agent avertie le ferailleur de mettre son harnais
Thermodarias (
369 SDO FY13 12 Contractor HSE Villas B Findings Contractor HSE 19-Mar-13 19-Mar-13 Closed
Chercheurs)
maçon travail en hauteur sans harnais l'agent avertie l’ouvrier de placer les garde corps
Thermodarias (
375 SDO FY13 12 Contractor HSE Villas B Findings Contractor HSE 19-Mar-13 19-Mar-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Travail en hauteur sans casque Avertissement par l'agent
Thermodarias (
376 SDO FY13 12 Contractor HSE Villas D Findings Contractor HSE 19-Mar-13 19-Mar-13 Closed
Chercheurs)
Travail en hauteur sans gard corp mise en place correcte des gards corps
Thermodarias (
379 SDO FY13 12 Contractor HSE Villas B Findings Contractor HSE 20-Mar-13 20-Mar-13 Closed
Chercheurs)
Des Zones sans nettoyage des madriers nettoyage de la zone 45 par l équipes de
Thermodarias ( suspondue nettoyage
383 SDO FY13 12 Contractor HSE Villas A Findings Contractor HSE 20-Mar-13 20-Mar-13 Closed
Chercheurs)
manque du gardes-corps d'une une platforme du mettre des gardes corps avec laisse et sous-
EMB ( Villas travail laisse
384 SDO FY13 12 Contractor HSE C Findings Contractor HSE 20-Mar-13 20-Mar-13 Closed
Margeurite)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori Noveaux ouvriers n'ont pas l'habitude de prendre Les former que c'est très important
International ( les lunettes
388 SDO FY13 12 Contractor HSE D Findings Contractor HSE 21-Mar-13 21-Mar-13 Closed
Aménagement
Ville Verte)
Gregori Les conditions d'activité et les comportements R,A,S
International ( Positive des ouvriers sont normal
389 SDO FY13 12 Contractor HSE G Contractor HSE 22-Mar-13
Aménagement Observation
Ville Verte)
Gregori Y a le respect de distance de sécurité entre R,A,S
International ( Positive engins et homme engins
390 SDO FY13 12 Contractor HSE I Contractor HSE 22-Mar-13
Aménagement Observation
Ville Verte)
Gregori Trous dans la zone 3 Balisé
International (
391 SDO FY13 12 Contractor HSE B Findings Contractor HSE 22-Mar-13 23-Mar-13 Closed
Aménagement
Ville Verte)
Gregori Les travaux se deroulent dans les bonnes R,A,S
International ( Positive conditions
392 SDO FY13 12 Contractor HSE G Contractor HSE 22-Mar-13
Aménagement Observation
Ville Verte)
Gregori Les deux ouvriers portent pas gants+lunettes Après plusieurs formation et avertissement
International ( orales, sont arrêtés
393 SDO FY13 12 Contractor HSE D Findings Contractor HSE 22-Mar-13 22-Mar-13 Closed
Aménagement
Ville Verte)
Position des éléments d'échaffaudage incorecte mise en place correcte
Thermodarias (
394 SDO FY13 13 Contractor HSE Villas C Findings Contractor HSE 23-Mar-13 23-Mar-13 Closed
Chercheurs)
Travail en hauteur sans harnais l'agent avertie le maçon de mettre son harnais
Thermodarias (
398 SDO FY13 13 Contractor HSE Villas B Findings Contractor HSE 25-Mar-13 25-Mar-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
travail sans EPI (chaussures+GANTS) manque des EPI
Thermodarias (
400 SDO FY13 13 Contractor HSE Villas D Findings Contractor HSE 26-Mar-13 26-Mar-13 Closed
Chercheurs)
travail en hauteur sans gard corps l'agent avertie l’ouvrier de placer les garde corps
Thermodarias (
404 SDO FY13 13 Contractor HSE Villas B Findings Contractor HSE 29-Mar-13 29-Mar-13 Closed
Chercheurs)
recupération de tous les panneaux a l'intereure presque tous les piste ne sont pas circuler par
STAM ( du dépôt notre engins , achévement des travaux
Positive
406 SDO FY13 13 Contractor HSE Aménagement H Contractor HSE 26-Mar-13
Observation
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori Les comportement des ouvriers sont normaux R,A,S
International ( Positive
412 SDO FY13 13 Contractor HSE G Contractor HSE 29-Mar-13
Aménagement Observation
Ville Verte)
EMB ( Villas
413 SDO FY13 14 Contractor HSE B Findings plate-forme sans gardes-corps mettre des gardes corps avec lisse et sous-lisse Contractor HSE 27-Mar-13 27-Mar-13 Closed
Margeurite)
EMB ( Villas
414 SDO FY13 14 Contractor HSE A Findings encombrement par madriers evacuation des madriers Contractor HSE 2-Apr-13 2-Apr-13 Closed
Margeurite)
Thermodarias (
417 SDO FY13 14 Contractor HSE Villas C Findings Position des éléments d'échaffaudage incorecte mise en place correcte Contractor HSE 30-Mar-13 30-Mar-13 Closed
Chercheurs)
Thermodarias (
Travaux en hauteur (décoffrage) sans faire
418 SDO FY13 14 Contractor HSE Villas B Findings L'agent avertie l'ouvrier Contractor HSE 30-Mar-13 30-Mar-13 Closed
attention aux autres
Chercheurs)
Thermodarias (
419 SDO FY13 14 Contractor HSE Villas B Findings Travail en hauteur sans harnais avertissement par l'agent Contractor HSE 1-Apr-13 1-Apr-13 Closed
Chercheurs)
Thermodarias (
420 SDO FY13 14 Contractor HSE Villas B Findings travail en hauteur sans gard corps mise en place correcte Contractor HSE 1-Apr-13 1-Apr-13 Closed
Chercheurs)
Thermodarias (
421 SDO FY13 14 Contractor HSE Villas B Findings Travail en hauteur sans harnais l'agent avertie le maçon de mettre son harnais Contractor HSE 2-Apr-13 2-Apr-13 Closed
Chercheurs)
Thermodarias (
422 SDO FY13 14 Contractor HSE Villas D Findings Travail sans lunettes sensibilisation. Contractor HSE 2-Apr-13 2-Apr-13 Closed
Chercheurs)
Thermodarias (
423 SDO FY13 14 Contractor HSE Villas D Findings travail sans EPI (chaussures+GANTS) manque des EPI Contractor HSE 2-Apr-13 2-Apr-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
424 SDO FY13 14 Contractor HSE Villas D Findings Travail en hauteur sans harnais Sensibilisation Contractor HSE 3-Apr-13 3-Apr-13 Closed
Chercheurs)
Thermodarias (
425 SDO FY13 14 Contractor HSE Villas C Findings monter au echafaudage sans echelle l'agent avertie l'ouvrier Contractor HSE 3-Apr-13 3-Apr-13 Closed
Chercheurs)
Thermodarias (
426 SDO FY13 14 Contractor HSE Villas B Findings Maçon travail en hauteur sans harnais sensibilisation+avertissement Contractor HSE 4-Apr-13 4-Apr-13 Closed
Chercheurs)
Thermodarias (
l'agent avertie l’ouvrier de placer les garde
427 SDO FY13 14 Contractor HSE Villas B Findings travail en hauteur sans gard corps Contractor HSE 5-Apr-13 5-Apr-13 Closed
corps
Chercheurs)
Gregori
International ( Les travaux se déroulent dans de bon
428 SDO FY13 14 Contractor HSE G Findings Moyens de sécurité sont disponible Contractor HSE 30,03,2013 30,03,2013 Closed
Aménagement conditions de sécurité
Ville Verte)
Gregori
International ( Le chauffeur de tracteur entran de réparer son Arrêt immidiat et l'informer qu'il y a le
429 SDO FY13 14 Contractor HSE I Findings Contractor HSE 01,04,2013 01,04,2013 Closed
Aménagement engin spécialiste Mécanicien pour les réparations
Ville Verte)
Gregori
Respect de distance de sécurité entre les
International ( Positive
430 SDO FY13 14 Contractor HSE G Toolbox meeting engins, et entre engins et homme, et de garder Contractor HSE 02,04,2013
Aménagement Observation
la zone de travail propre
Ville Verte)
Gregori
International ( Positive
431 SDO FY13 14 Contractor HSE G Ls conditions de travail sont normales R,A,S Contractor HSE 02,04,2013
Aménagement Observation
Ville Verte)
Gregori
International ( Chauffeur de camion a laisser le reste de repas L'informer de ne plus manger anarchiquement
432 SDO FY13 14 Contractor HSE T Findings Contractor HSE 03,04,2013 03,04,2013 Closed
Aménagement dans le chantier sur chantier
Ville Verte)
Immidiatement , on a sensibilisé le chauffeur du
SEFIANI ( A l'interieure du chantier, lors des travaux un
camions et les ouvriers que il est strictement
433 SDO FY13 14 Contractor HSE Voirie/Assainiss I Findings chauffeur du camions transporte des ouvriers Contractor HSE 4-Apr-13 4-Apr-13 Closed
interdit de transporter les ouvriers dans une
ement) dans la benne
beenne
EMB ( Villas
434 SDO FY13 15 Contractor HSE A Findings manque de rangement et nettoyage nettoyage systématique après décoffrage Contractor HSE 6-Apr-13 6-Apr-13 Closed
Margeurite)
Gregori
International ( Positive
435 SDO FY13 15 Contractor HSE G Les conditions des travaux sont normaux Contractor HSE 6-Apr-13
Aménagement Observation
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( Positive
436 SDO FY13 15 Contractor HSE D Le port des EPI est fait pour tout le monde, Contractor HSE 6-Apr-13
Aménagement Observation
Ville Verte)
Gregori
International ( Positive
437 SDO FY13 15 Contractor HSE I Extincteur pour BOBCAT Contractor HSE 6-Apr-13
Aménagement Observation
Ville Verte)
Gregori
International ( Positive
438 SDO FY13 15 Contractor HSE G Les conditions des travaux sont normaux Contractor HSE 6-Apr-13
Aménagement Observation
Ville Verte)
Gregori
International ( Chauffeur chargeur veut charger Gazoil dans un
439 SDO FY13 15 Contractor HSE H Findings Interdit Gazoil c'est au dépôt avec le pompiste, Contractor HSE 7-Apr-13 7-Apr-13 Closed
Aménagement bidon
Ville Verte)
Gregori
International ( Lui former de l'importance de Gilet de
440 SDO FY13 15 Contractor HSE D Findings Chauffeur de minipelle Travail sans Gilet, Contractor HSE 8-Apr-13 8-Apr-13 Closed
Aménagement signalisation
Ville Verte)
Gregori
International ( Positive
441 SDO FY13 15 Contractor HSE D Tout le monde portent leur EPI, Contractor HSE 9-Apr-13
Aménagement Observation
Ville Verte)
STAM ( Apres l'operation de vidange , les ouvriers ont Appel immediat au equipe du mecanicien , ils
442 SDO FY13 15 Contractor HSE Aménagement T Findings laisser des chiffons et des filtres sur le sol ont rammasser tous les polluants au poubelle Contractor HSE 10-Apr-13 10-Apr-13 Closed
Ville Verte) directement . speciale
Thermodarias (
444 SDO FY13 15 Contractor HSE Villas C Findings Position des éléments d'échaffaudage incorecte mise en place correcte Contractor HSE 10-Apr-13 10-Apr-13 Closed
Chercheurs)
Thermodarias (
Travaux en hauteur (décoffrage) sans faire
445 SDO FY13 15 Contractor HSE Villas B Findings L'agent avertie l'ouvrier Contractor HSE 10-Apr-13 10-Apr-13 Closed
attention aux autres
Chercheurs)
Thermodarias (
446 SDO FY13 15 Contractor HSE Villas B Findings Travail en hauteur sans harnais avertissement par l'agent Contractor HSE 10-Apr-13 10-Apr-13 Closed
Chercheurs)
Thermodarias (
447 SDO FY13 15 Contractor HSE Villas B Findings travail en hauteur sans gard corps mise en place correcte Contractor HSE 10-Apr-13 10-Apr-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
448 SDO FY13 15 Contractor HSE Villas B Findings Travail en hauteur sans harnais l'agent avertie le maçon de mettre son harnais Contractor HSE 10-Apr-13 10-Apr-13 Closed
Chercheurs)
Thermodarias (
449 SDO FY13 15 Contractor HSE Villas D Findings Travail sans lunettes sensibilisation. Contractor HSE 11-Apr-13 11-Apr-13 Closed
Chercheurs)
Thermodarias (
450 SDO FY13 15 Contractor HSE Villas D Findings travail sans EPI (chaussures+GANTS) manque des EPI Contractor HSE 10-Apr-13 10-Apr-13 Closed
Chercheurs)
Thermodarias (
451 SDO FY13 15 Contractor HSE Villas B Findings Travail en hauteur sans harnais Sensibilisation Contractor HSE 11-Apr-13 11-Apr-13 Closed
Chercheurs)
Thermodarias (
452 SDO FY13 15 Contractor HSE Villas C Findings monter au echafaudage sans echelle l'agent avertie l'ouvrier Contractor HSE 12-Apr-13 12-Apr-13 Closed
Chercheurs)
Thermodarias (
453 SDO FY13 15 Contractor HSE Villas B Findings Maçon travail en hauteur sans harnais sensibilisation+avertissement Contractor HSE 12-Apr-13 12-Apr-13 Closed
Chercheurs)
Thermodarias (
l'agent avertie l’ouvrier de placer les garde
454 SDO FY13 15 Contractor HSE Villas B Findings travail en hauteur sans gard corps Contractor HSE 12-Apr-13 12-Apr-13 Closed
corps
Chercheurs)
EMB ( Villas
455 SDO FY13 16 Contractor HSE A Findings Manque de Nettoyage et de rangement rangement des maadriers Contractor HSE 15-Apr-13 15-Apr-13 Closed
Margeurite)
Gregori
International ( Positive
456 SDO FY13 16 Contractor HSE M Insepection effectuée de tous les extincteurs 16-Apr-13
Aménagement Observation
Ville Verte)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Yassine SEFIANI (
461 SDO FY13 16 I Findings Pas de signaleur accompagnant une pelle Contractor HSE 18-Apr-13 30-Mar-13 Closed
Fakhraddine Voirie VV)
Des problèmes constatés de levage : Le survol Des Tagline ou cordes de guidage sont
Yassine EMB ( Villas
464 SDO FY13 16 F Findings de charge au dessus des ouvriers est nécessaires pour la manipulation de panneaux Contractor HSE 18-Apr-13 19-Apr-13 Closed
Fakhraddine Margeurite)
formellement interdit. de coffrage.
Thermodarias (
Yassine Positive Zone nettoyées et présence de SPA affichées
467 SDO FY13 16 Villas G 19-Apr-13
Fakhraddine Observation et dûment remplies :
Chercheurs)
Thermodarias (
Yassine Travaux en hauteur sans protection collective
468 SDO FY13 16 Villas B Findings Contractor HSE 19-Apr-13 Open
Fakhraddine ou individuelle : Risque de chutes imminentes.
Chercheurs)
Thermodarias (
Yassine Toujours pas de linguets sécurité sur des
469 SDO FY13 16 Villas F Findings Contractor HSE 19-Apr-13 30-Apr-13 Closed
Fakhraddine crochets utilisés lors des levages :
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Gregori
International ( arret immédiat et l'informer de l'importance des
473 SDO FY13 17 Contractor HSE D Findings Le mecanicen travaille sans paire de gant Contractor HSE 21-Apr-13 21-Apr-13 Closed
Aménagement gants.
Ville Verte)
Yassine EMB ( Villas • La présence de passerelles en hauteur sans Former les ouvriers sur une concepetion plus
477 SDO FY13 17 B Findings Contractor HSE 23-Apr-13 30-Apr-13 Closed
Fakhraddine Margeurite) garde corps sécuritsée des plate formes
Yassine EMB ( Villas • Des échelles courtes et non fixées. dans des
480 SDO FY13 17 C Findings Former et fournir le bon matériel Contractor HSE 23-Apr-13 30-Apr-13 Closed
Fakhraddine Margeurite) excavations
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
Yassine l’opérateur travaille sans port complet de gants, procéder a une meilleure supervision vis-à-vis
484 SDO FY13 17 Villas D Findings Contractor HSE 25-Apr-13 25-Apr-13 Closed
Fakhraddine tablier et protection oculaire. du port des epi par les ouvriers
Chercheurs)
Thermodarias (
Yassine Des levages sont opérés malgré l’absence de
485 SDO FY13 17 Villas F Findings Remplacer les crochets déffectueux Contractor HSE 25-Apr-13 26-Apr-13 Closed
Fakhraddine linguet de sécurité sur les différents crochets.
Chercheurs)
Thermodarias (
487 SDO FY13 18 Contractor HSE Villas C Findings Position des éléments d'échaffaudage incorecte mise en place correcte Contractor HSE 27-Apr-13 27-Apr-13 Closed
Chercheurs)
Thermodarias (
Travaux en hauteur (décoffrage) sans faire
488 SDO FY13 18 Contractor HSE Villas B Findings L'agent avertie l'ouvrier Contractor HSE 27-Apr-13 27-Apr-13 Closed
attention aux autres
Chercheurs)
Thermodarias (
489 SDO FY13 18 Contractor HSE Villas B Findings Travail en hauteur sans harnais avertissement par l'agent Contractor HSE 29-Apr-13 29-Apr-13 Closed
Chercheurs)
Thermodarias (
490 SDO FY13 18 Contractor HSE Villas B Findings travail en hauteur sans gard corps mise en place correcte Contractor HSE 29-Apr-13 29-Apr-13 Closed
Chercheurs)
Thermodarias (
491 SDO FY13 18 Contractor HSE Villas B Findings Travail en hauteur sans harnais l'agent avertie le maçon de mettre son harnais Contractor HSE 29-Apr-13 29-Apr-13 Closed
Chercheurs)
Thermodarias (
492 SDO FY13 18 Contractor HSE Villas D Findings Travail sans lunettes sensibilisation. Contractor HSE 30-Apr-13 30-Apr-13 Closed
Chercheurs)
Thermodarias (
493 SDO FY13 18 Contractor HSE Villas D Findings travail sans EPI (chaussures) MP DE 3 JOURS Contractor HSE 30-Apr-13 30-Apr-13 Closed
Chercheurs)
Thermodarias (
494 SDO FY13 18 Contractor HSE Villas B Findings Travail en hauteur sans harnais Sensibilisation Contractor HSE 2-May-13 2-May-13 Closed
Chercheurs)
Thermodarias (
495 SDO FY13 18 Contractor HSE Villas C Findings monter au echafaudage sans echelle l'agent avertie l'ouvrier Contractor HSE 2-May-13 2-May-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
496 SDO FY13 18 Contractor HSE Villas B Findings Maçon travail en hauteur sans harnais sensibilisation Contractor HSE 3-May-13 3-May-13 Closed
Chercheurs)
Thermodarias (
l'agent avertie l’ouvrier de placer les garde
497 SDO FY13 18 Contractor HSE Villas B Findings travail en hauteur sans gard corps Contractor HSE 3-May-13 3-May-13 Closed
corps
Chercheurs)
SEFIANI ( des ouviriers a coté du tranché ne respect pas Immediatement on as sensibiliser et on as fait
498 SDO FY13 18 Contractor HSE I Findings Contractor HSE 3-May-12 3-May-12 Closed
Voirie VV) la distance entre eux et la fleche de la pelle un rappel des consignes securité
EMB ( Villas
500 SDO FY13 18 Contractor HSE A Findings les fers en attente non protégés Fournir capuchons et bouchons de protection Contractor HSE 3-May-12 4-May-12 Closed
Margeurite)
Thermodarias (
502 SDO FY13 19 Contractor HSE Villas C Findings Position des éléments d'échafaudage incorrecte mise en place correcte Contractor HSE 4-May-13 4-May-13 Closed
Chercheurs)
Thermodarias (
503 SDO FY13 19 Contractor HSE Villas B Findings Travaux en hauteur (décoffrage) sans harnais sensibilisation + Avertissement Contractor HSE 4-May-13 4-May-13 Closed
Chercheurs)
Gregori
l'importance de respecter les normes de
International ( Positive
504 SDO FY13 19 Contractor HSE G TOOLBOX Meeting sécurité, et à ce jour on est toujours dans le but Contractor HSE 6-May-13
Aménagement Observation
de zéro incident et zéro accident alhamdo lillh,
Ville Verte)
Thermodarias (
505 SDO FY13 19 Contractor HSE Villas B Findings Travail en hauteur sans harnais avertissement par l'agent Contractor HSE 6-May-13 6-May-13 Closed
Chercheurs)
Thermodarias (
506 SDO FY13 19 Contractor HSE Villas B Findings travail en hauteur sans gard corps mise en place correcte Contractor HSE 6-May-13 6-May-13 Closed
Chercheurs)
Thermodarias (
507 SDO FY13 19 Contractor HSE Villas B Findings Travail en hauteur sans harnais l'agent avertie le ferailleur de mettre son harnais Contractor HSE 6-May-13 6-May-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
508 SDO FY13 19 Contractor HSE Villas D Findings Travail en hauteur sans casque avertissement par l'agent Contractor HSE 7-May-13 7-May-13 Closed
Chercheurs)
Thermodarias (
509 SDO FY13 19 Contractor HSE Villas B Findings travail en hauteur sans Gard corps ni harnais sensibilisation par l'agent Contractor HSE 7-May-13 7-May-13 Closed
Chercheurs)
Thermodarias (
512 SDO FY13 19 Contractor HSE Villas B Findings Travail en hauteur sans harnais Sensibilisation Contractor HSE 8-May-13 8-May-13 Closed
Chercheurs)
Thermodarias (
513 SDO FY13 19 Contractor HSE Villas B Findings travail en hauteur sans garde corps sensibilisation et formation Contractor HSE 8-May-13 8-May-13 Closed
Chercheurs)
Thermodarias (
514 SDO FY13 19 Contractor HSE Villas B Findings Maçon travail en hauteur sans harnais sensibilisation+avertissement Contractor HSE 8-May-13 8-May-13 Closed
Chercheurs)
Thermodarias (
l'agent avertie l’ouvrier de placer les garde
515 SDO FY13 19 Contractor HSE Villas B Findings maçon travail en hauteur sans harnais Contractor HSE 8-May-13 8-May-13 Closed
corps
Chercheurs)
EMB ( Villas
516 SDO FY13 19 Contractor HSE E Findings manque de protection des fouilles Baliser les foilles par filet avertisseur Contractor HSE 9-May-13 9-May-13 Closed
Margeurite)
EMB ( Villas
518 SDO FY13 19 Contractor HSE A Findings manque de rangement et nettoyage nettoyage systématique après décoffrage Contractor HSE 9-May-13 9-May-13 Closed
Margeurite)
Thermodarias (
519 SDO FY13 19 Contractor HSE Villas D Findings Travail en hauteur sans casque Avertissement par l'agent Contractor HSE 9-May-13 9-May-13 Closed
Chercheurs)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Thermodarias (
520 SDO FY13 19 Contractor HSE Villas B Findings travail en hauteur sans harnais avertissement par l'agent Contractor HSE 9-May-13 9-May-13 Closed
Chercheurs)
Thermodarias (
521 SDO FY13 19 Contractor HSE Villas D Findings travail sans chaussures de sc avertissement par l'agent Contractor HSE 9-May-13 9-May-13 Closed
Chercheurs)
Thermodarias (
522 SDO FY13 19 Contractor HSE Villas B Findings Travail en hauteur sans gard corp mise en place correcte des gards corps Contractor HSE 9-May-13 9-May-13 Closed
Chercheurs)
Thermodarias (
523 SDO FY13 19 Contractor HSE Villas D Findings Tailleur de piérre sans lunettes Sensibilisation par l'agent Contractor HSE 10-May-13 10-May-13 Closed
Chercheurs)
Thermodarias (
524 SDO FY13 19 Contractor HSE Villas D Findings Travail sans chaussures sécurité avertissement par l'agent Contractor HSE 10-May-13 10-May-13 Closed
Chercheurs)
Gregori
International ( Positive
525 SDO FY13 19 Contractor HSE D Il y a le respect général au niveau port des EPI, R,A,S Contractor HSE 10-May-13
Aménagement Observation
Ville Verte)
Gregori
International ( Positive Encourager les ouvriers pour leur descipline et
526 SDO FY13 19 Contractor HSE D Respect de port des EPI régulièrement Contractor HSE 6-May-13
Aménagement Observation pour le respect des régles du sécurité.
Ville Verte)
Gregori
International ( Positive Les travaux se deroulent dans les bonnes
527 SDO FY13 19 Contractor HSE G R,A,S Contractor HSE 7-May-13
Aménagement Observation conditions
Ville Verte)
Gregori
International ( Positive Les conditions d'activité et les comportements
528 SDO FY13 19 Contractor HSE G R,A,S Contractor HSE 9-May-13
Aménagement Observation des ouvriers sont normalles
Ville Verte)
EMB ( Villas Utilisation d'un échafaudage sans protections mettre des gardes corps avec laisse et sous-
530 SDO FY13 20 Contractor HSE C Findings Contractor HSE 13-May-13 13-May-13 Closed
Margeurite) collectifs laisse
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
GRTP ( Villas
534 SDO FY13 20 Contractor HSE I Findings pare brise du pelle cassé on a fait changé le pare brise Contractor HSE 14-May-13 14-May-14 Closed
Marguerite)
Gregori
International ( Positive Encourager les ouvrier pour leur descipline et
535 SDO FY13 20 Contractor HSE D Respect de port des EPI régulièrement Contractor HSE 16-May-13
Aménagement Observation pour le respect des régles du sécurité.
Ville Verte)
Travailleur en hauteur sans aucune protection. Faire appliquer les règles de sécurité par le
Thermodarias ( • Ouvrier ne portant aucun harnais. biais de sensibilisation continue.
Yassine
536 SDO FY13 20 Villas B Findings • Risque imminent de chute en hauteur pour Contractor HSE 15-May-13 15-May-13 Closed
Fakhraddine
Chercheurs) des ouvriers travaillant sans aucune protection. Impliquer de plus en plus les différents chefs
Absence de gants
• Animateurs et de lunettes
HSE présents dezone
dans la sécurité
mais d’équipe dans la démarche HSE du chantier et
• Manutention manuelle de ferraillage, de
Thermodarias (
Yassine panneaux de coffrage et de planche de bois Procéder a une distribution systématique des
537 SDO FY13 20 Villas D Findings Contractor HSE 15-May-13 15-May-13 Closed
Fakhraddine comprenant des clous sans gants de sécurité. EPI
Chercheurs)
• Risque de
Absence de coupure grandement
protections collectivesélevé.
en rive de
dalles. Informer le responsable HSE et les
Thermodarias (
Yassine Travailleurs en hauteur sans aucune protection. responsables travaux des non-conformités.
538 SDO FY13 20 Villas B Findings Contractor HSE 15-May-13 15-May-13 Closed
Fakhraddine Absence des gardes corps au niveau des rives
Chercheurs)
de la dalle
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Anticiper en fournissant aux travailleurs des
échafaudages conventionnels puis inspectés
Yassine EMB ( Villas Utilisation de tours d’étaiement improvisées en
544 SDO FY13 20 C Findings ou fournir plate forme travail offrant des Contractor HSE 15-May-13 15-May-13 Closed
Fakhraddine Margeurite) échafaudages.
conditions plus sécurisés : Accès et issues
sécurisées, platelage complet sous les pieds
Sensibiliser massivement et former les
Yassine EMB ( Villas
545 SDO FY13 20 C Findings Mauvaise utilisation des échelles compagnons sur l’utilisation des échelles (Les Contractor HSE 15-May-13 16-May-13 Closed
Fakhraddine Margeurite)
3 points obligatoires de contact)
Gregori
International (
548 SDO FY13 21 Contractor HSE D Findings Ouvrier sans chausseurs de securité, Sanctionné et mise à pied Contractor HSE 20-May-13 20-May-13 Closed
Aménagement
Ville Verte)
Gregori
International ( Positive Sujet: Rappel sur les normes de sécurité, et
549 SDO FY13 21 Contractor HSE G Tool box Meeting
Aménagement Observation comment faire si on a eu un accident,
Ville Verte)
Gregori
International (
550 SDO FY13 21 Contractor HSE I Findings Chauffeur de JCB roule avec une grande vitesse Lui renseinger de ne pas depasser 20km/h, Contractor HSE 22-May-13 22-May-13 Closed
Aménagement
Ville Verte)
EMB ( Villas Positive Identifier les risques sous terrain 1/Prévoir des plans de récollement
553 SDO FY13 21 Contractor HSE L 23-May-13
Margeurite) Observation (présence des câbles MT) 2/ Faire des sondages sur la zone du travail
EMB ( Villas
555 SDO FY13 21 Contractor HSE B Findings Manque de protection collective installer des garde-corps Contractor HSE 22-May-13 22-May-13 Closed
Margeurite)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
il faut obligatoirement que l’entreprise insère
Des dizaines de compagnons en hauteur (
dans ses modes opératoires la mise en place
Yassine EMB ( Villas 2,3,4 mètres) sans aucune protection ni Contractor
556 SDO FY13 21 B Findings systématique de garde corps (en bonne et due 24-May-13 24-May-13 Closed
Fakhraddine Margeurite) collective ni individuelle (y compris des chefs Manager
forme, lisses et sous lisses incluses) ou la mise
d’équipes, chefs de chantier).
en place de lignes de vie/point d’ancrage
Des écarts de conduite et un manque grave de une sensibilisation massive et effective des
Yassine
566 SDO FY13 22 Cegelec G Findings sensibilisation chez le personnel sous-traitant sous-traitants et du personnel CEGELEC, de Contractor HSE 30-May-13 30-May-13 Closed
Fakhraddine
de Cegelec manière générale.
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
EMB ( Villas
568 SDO FY13 23 Contractor HSE D Findings Manquement au port des EPI Sensibiliser les ouvriers Contractor HSE 6-Jun-13 6-Jun-13 Closed
Margeurite)
Gregori
International ( Positive Contractor
572 SDO FY13 23 Contractor HSE A Respect des régles de sécurité
Aménagement Observation Supervisor
Ville Verte)
Gregori
International ( Sensibilisation des ouvriers et distribution de
573 SDO FY13 23 Contractor HSE D Findings Manquement au port des EPI Contractor HSE 4-Jun-13 4-Jun-13 Closed
Aménagement gants
Ville Verte)
Gregori
International ( Positive Contractor
574 SDO FY13 23 Contractor HSE A Respect des régles de sécurité
Aménagement Observation Supervisor
Ville Verte)
576 SDO FY13 23 Contractor HSE Cegelec A Findings Absence de balisage de la zone de travail Baliser la zone de travail Contractor HSE 1-Jun-13 1-Jun-13 Closed
Khalil
577 SDO FY13 23 Cegelec G Findings SPA non conforme La mise en conformité du SPA Contractor HSE 1-Jun-13 1-Jun-13 Closed
Elbelkasmi
Khalil EMB ( Villas Plate forme de travail incomplète et absence de Veiller sur la mise en place d'une plateforme
578 SDO FY13 23 K Findings Khalil Elbelkasmi 12-Jun-13 12-Jun-13 Closed
Elbelkasmi Margeurite) gardecorps conforme avec des gardecorps.
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Travaux d'étanchéité non conforme-Absence
Arret du poste de travail.Demander au
Khalil EMB ( Villas d'extincteur-Absence du chariot pour le
580 SDO FY13 23 M Findings reponsable la mise en conformité du poste de Khalil Elbelkasmi 12-Jun-13 12-Jun-13 Closed
Elbelkasmi Margeurite) déplacement de la bouteille de gaz-non port
travail.
des vetements anti-feu
Réparer la barrière+La mise en place d'un
grillage à fin d'interdire aux ouvriers de passer
Khalil EMB ( Villas Camion malaxeur de béton heurte la barrière Contractor
581 SDO FY13 23 I Findings devant l'entrée des engins.+Réparer les freins 12-Jun-13 12-Jun-13 Closed
Elbelkasmi Margeurite) de sécurité à l'entrée du chantier Manager
du camion+Inspecter l'ensemble des engins du
chantier.
Mauvaise méthode d'élingage lors du Former les ouvriers sur la bonne méthode
Khalil EMB ( Villas
587 SDO FY13 23 F Findings déplacement des panneaux de coffrage par des d'attache des charges.Avertir le grutier et le Contractor HSE 7-Jun-13 7-Jun-13 Closed
Elbelkasmi Margeurite)
grues sensibilisé du danger
Khalil SEFIANI ( Fouilles en tranchées non complétement Sensibiliser les ouvriers.Veiller sur le mise en
590 SDO FY13 23 B Findings Khalil Elbelkasmi 11-Jun-13 11-Jun-13 Closed
Elbelkasmi Voirie VV) protégées-Risques de chutes conformité de la protection.
Khalil SEFIANI ( Ferraillages en attentes non protégées-risques La mise en place des tuyaux plastic pour la
591 SDO FY13 23 T Findings Khalil Elbelkasmi 11-Jun-13 11-Jun-13 Closed
Elbelkasmi Voirie VV) de trébuchements et de blessures protection des ferraillages en attentes
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Yassine Ouvrier sans manches et fumant un pipe sur la Sensibiliser l'ouvrier et le chef d'équipe sur le Yassine
592 SDO FY13 23 ILB L Findings 4-Jun-13 4-Jun-13 Closed
Fakhraddine base vie port de manche et l'interdiction de fumer Fakhraddine
EMB ( Villas
594 SDO FY13 24 Contractor HSE F Findings survol des charges sensibilisation/équipé les grues par des klaxons Contractor HSE 11-Jun-13 12-Jun-13 Closed
Margeurite)
EMB ( Villas
596 SDO FY13 24 Contractor HSE D Findings UN conducteur ne porte pas le gilet sensibilisation du compagnon Contractor HSE 11-Jun-13 11-Jun-13 Closed
Margeurite)
Un opérateur du sous traitant Global électrique Prévoir des échaffaudage conformes pour tous
598 SDO FY13 24 Contractor HSE Cegelec C Findings Contractor HSE 12-Jun-13 12-Jun-13 Closed
travail en hauteur en utlisant un echelle travaux en hauteur
Positive Ouverture des tranchées en voisinnage de la Formation et sensibilisation pour les risques
601 SDO FY13 24 Contractor HSE Cegelec E 12-Jun-13
Observation ligne MT et HT principales des électrisation
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
617 SDO FY13 25 Contractor HSE Cegelec M Findings Manque d'éxtincteur à côté du compresseur Mettre en place un extincteur Contractor HSE 20-Jun-13 Closed
Manquement aux mesures de sécurité pour une Informer le responsable HSE et le chef
fouille en d’équipe.
Khalil SEFIANI (
618 SDO FY13 25 E Findings tranchée de 3m de profondeur et à parois Arrêt des postes de travail. Contractor HSE 17-Jun-13 17-Jun-13 Closed
Elbelkasmi Voirie VV)
verticales-Absence Demander aux ouvriers de sortir de la tranchée.
de blindage
Eléments pour lesappartenant
défaillant parois-Absence
à unede moyen Sensibiliser les ouvriers aux dangers existant
Gregori
remorque pour citerne Informer Le conducteur travaux.
Khalil International (
619 SDO FY13 25 I Findings à eau -Pneus lisses- Utilisation des fers à L’arrêt de l’utilisation de la remorque jusqu'à sa Contractor HSE 17-Jun-13 17-Jun-13 Closed
Elbelkasmi Aménagement
béton comme mise en conformité
Ville Verte)
composants d’attaches.
Khalil Passage non fermé et non signalé menant vers La mise en place d’une bande signalétique qui
620 SDO FY13 25 Cegelec E Findings Contractor HSE 17-Jun-13 17-Jun-13 Closed
Elbelkasmi une tranchée. indique la fin du passage.
Thermodarias (
Khalil Informer l’animateur HSE et le chef d’équipe.
624 SDO FY13 25 Villas B Findings Regard non protégé-Risque de chute. Contractor HSE 19-Jun-13 19-Jun-13 Closed
Elbelkasmi Protéger L’ouverture et standardiser l’action.
Chercheurs)
Plate forme de travail en hauteur non conforme Informer l’animateur HSE et le chef d’équipe.
Thermodarias ( - Risque de chute Déplacer le matériel stocké au dessous de la
Khalil
625 SDO FY13 25 Villas B Findings d’hauteur-Stockage non approprié du matériel plate-forme. Contractor HSE 19-Jun-13 19-Jun-13 Closed
Elbelkasmi
Chercheurs) sous et sur la plateforme- Démonter la plate-forme utilisée par les
Absence de moyen d’accès-Garde-corps ouvriers.
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Informer le chef d’équipe et l’animateur HSE.
Ferraillages en attentes non signalés et non
Khalil EMB ( Villas Couder les ferraillages en attentes.
628 SDO FY13 25 A Findings protégés Contractor HSE 21-Jun-13 21-Jun-13 Closed
Elbelkasmi Margeurite) Communiquer aux ouvriers l’action mise en
(Risques de blessures).
place.
Regards non protégés et non signalés-Ferres Informer le chef de chantier et le chef d’équipe.
Khalil EMB ( Villas
629 SDO FY13 25 B Findings en attente Baliser la zone et Contractor HSE 21-Jun-13 21-Jun-13 Closed
Elbelkasmi Margeurite)
non protégés. protéger les ferres en attente par des tuyaux.
Informer le responsable et l’animateur HSE et
Stockage du matériel dans la zone de travail- le chef d’équipe.
Khalil EMB ( Villas
630 SDO FY13 25 A Findings Passage Déplacer les éléments stockés, et éliminer le Contractor HSE 21-Jun-13 21-Jun-13 Closed
Elbelkasmi Margeurite)
obstrué (Risque de trébuchement). danger existant.
Nettoyer et ranger la zone.
Ouverture non protégée (Risque de Informer le chef d’équipe et l’animateur HSE.
Khalil EMB ( Villas
631 SDO FY13 25 A Findings trébuchement et de Veiller sur la fermeture de l’ouverture. Contractor HSE 21-Jun-13 21-Jun-13 Closed
Elbelkasmi Margeurite)
chute). Recommandations
Informer le responsable HSE et le chef
d’équipe.
Khalil EMB ( Villas
632 SDO FY13 25 B Findings Stockage de matériel en hauteur non conforme. Déplacer le matériel et nettoyer la plateforme. Contractor HSE 21-Jun-13 21-Jun-13 Closed
Elbelkasmi Margeurite)
Designer une zone de stockage pour le
matériel
Informer utilisé.
le chef d’équipe et l’animateur HSE.
Travaux en hauteur sans aucune protection Demander à l’ouvrier de descendre
Khalil EMB ( Villas
633 SDO FY13 25 B Findings (Collective et immédiatement. Contractor HSE 21-Jun-13 21-Jun-13 Closed
Elbelkasmi Margeurite)
individuelle) .Risque de chute de hauteur. Sensibiliser les ouvriers à-propos de
l’importance de la protection collective et
Mettre en
Une fouille non balisée de profondeur 3met 2
634 SDO FY13 26 Contractor HSE Cegelec E Findings place du balisage en tt urgence; passage des Contractor HSE 22-Jun-13 22-Jun-13 Closed
mde longueur
enfants à côté
Travail en
635 SDO FY13 26 Contractor HSE Cegelec L Findings Guide opération et sen sibilisation Contractor HSE 22-Jun-13 22-Jun-13 Closed
hauteur sous la ligne THT sous tension
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
642 SDO FY13 26 Contractor HSE ILB I Findings BIP recule DE TRACTOPELLE défaillaint REPARATION Contractor HSE 24-Jun-13 24-Jun-13 Closed
643 SDO FY13 26 Contractor HSE ILB A Findings PICKETS non couvert CHAMPIGNION Contractor HSE 24-Jun-13 Closed
GRTP ( Villas
644 SDO FY13 26 Contractor HSE D Findings Manque de gant et de lunettes de protection la commande est effectuée Contractor HSE 24-Jun-13 24-Jun-13 Closed
Marguerite)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Présence
Dégader
des pins (guide tube) au tranché fibre optique, Contractor
653 SDO FY13 27 Contractor HSE Cegelec E Findings les déblaie à côté pour libere un peu de 13-ﻳﻭﻟﻳﻪ-04 13-ﻳﻭﻟﻳﻪ-04 Closed
risque de chute des employés travaillant en Supervisor
l'éspace
dessus
Prsence de
Arrosage Contractor
654 SDO FY13 27 Contractor HSE Cegelec H Findings la poussière lors du déchargement et 13-ﻳﻭﻟﻳﻪ-05 13-ﻳﻭﻟﻳﻪ-05 Closed
systimatique à effectuer sur place Supervisor
chargement du sable
656 SDO FY13 27 Contractor HSE ILB I Findings ENGIN NON CONFORME Engin evacué du chantier Contractor HSE 29-Jun-13 29-Jun-13 Closed
Contractor
657 SDO FY13 27 Contractor HSE ILB O Findings GESTION DECHET TRI selectif 13-ﻳﻭﻟﻳﻪ-05 13-ﻳﻭﻟﻳﻪ-05 Closed
Supervisor
EMB ( Villas
659 SDO FY13 27 Contractor HSE B Findings un coffreur travail en hauteur sans harnais arreter le poste de travail/Sanctioné le coffreur Contractor HSE 13-ﻳﻭﻟﻳﻪ-04 13-ﻳﻭﻟﻳﻪ-04 Closed
Margeurite)
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Informer le responsable HSE et le chef
Déplacement d’un compacteur dans le godet d’équipe.
Khalil SEFIANI (
664 SDO FY13 27 I Findings d’une chargeuse sur Placer le compacteur dans l’espace ouvert à Contractor HSE 13-ﻳﻭﻟﻳﻪ-01 13-ﻳﻭﻟﻳﻪ-01 Closed
Elbelkasmi Voirie VV)
pneus. l’arrière d’un pick-up.
Sensibiliser le conducteur de l’engin à-propos
Yassine Non port constant des EPI de la part des Sensibilisation du chef d'équipe intervenant Yassine
665 SDO FY13 27 ILB D Findings 13-ﻳﻭﻟﻳﻪ-03 13-ﻳﻭﻟﻳﻪ-03 Closed
Fakhraddine ouvriers dans la zone Fakhraddine
(SOR A: Housekeeping/Storage B: Fall Protection C: Scaffolds/Ladders/Stairs D: Personal Protective Equipment E: Excavations F: Lifting/Hoisting/Rigging G: Work method - SPA H: Transport/Handling I: Vehicles/Transport J: Tools/Equipment K: Fall & Stumbling L: Electricity M: Fire
categories): Protection N: Communication/Attitude O: Accesses/Passage/Escape routes P: Trainin/Toolbox/Meetings Q: Inspection & Evaluation R: HSE Documentation & Evaluation S: Sub-contractor management T: Other
SOR / SER
Ref. Inspection / Contractor Status of
FY Week Originator Category Type Description Corrective Action (CA) Action by Closure Date Date Closed
Number Audit Origantor CA
/ Incident
Informer le chef d’équipe et l’animateur HSE.
Ouvertures non protégée et non signalée. Signaler et protéger les ferraillages en attentes
Khalil EMB ( Villas
676 SDO FY13 27 B Findings Risque de par des tuyaux. Contractor HSE 13-ﻳﻭﻟﻳﻪ-04 13-ﻳﻭﻟﻳﻪ-04 Closed
Elbelkasmi Margeurite)
chute de hauteur. Communiquer aux ouvriers l’action mise en
place.