30420212
[¨É®úÉ`öÒ] [<ÆOÉVÉÒ]
MAHARASHTRA STATE BOARD OF VOCATIONAL EDUCATION EXAMINATIONS, MUMBAI
Examination—April, 2017
CERTIFICATE COURSE IN CONSTRUCTION SUPERVISOR
[´Éä³ý—3 iÉɺÉ]
(BEÚòhÉ MÉÖhÉ—100)
Bº]õÒ¨Éä]õÓMÉ +ìhb÷ EòÉìº]õÓMÉ (ÊlÉ+®úÒ--2)
MÉÖhÉ
1. (+) Ê®úEòɨªÉÉ VÉÉMÉÉ ¦É®úÉ (EòÉähÉiªÉɽþÒ {ÉÉSÉ) :— 5
(1) =VɳýhÉÒ +ÆnùÉVÉ{ÉjÉEò ½þÉ ................ +ÆnùÉVÉ{ÉjÉEòÉSÉÉ |ÉEòÉ®ú +ɽäþ.
(2) |ÉEò±{ÉÉSÉÒ ¤ÉÉVÉÉ®ú¦ÉÉ´ÉÉ|ɨÉÉhÉä +ÆnùÉVÉä ËEò¨ÉiÉ EòÉføhÉä ¨½þhÉVÉä ............... ½þÉäªÉ.
(3) ºÉʴɺiÉ®ú +ÆnùÉVÉ{ÉjÉEòÉiÉ EòɨÉÉSÉÒ ËEò¨ÉiÉ ................ {ÉjÉEòÉiÉ xÉÉånù´ÉiÉÉiÉ.
(4) ................ ¨ÉvªÉä EòɨÉÉSÉä +SÉÚEò ´ÉhÉÇxÉ, ¨ÉɱÉ, |ɨÉÉhÉ ´É EòÉ®úÉÊMÉ®úÒ ªÉÉʴɹɪÉÒ
¨ÉÉʽþiÉÒ Ê¨É³ýiÉä.
(5) ºlÉÉ{ÉiªÉ +ʦɪÉÉÆÊjÉEòÒ EòɨÉÉƨÉvªÉä |ÉiªÉäEò Eò±É¨ÉɺÉÉ`öÒ ±ÉÉMÉhÉÉ®äú ................
º´ÉiÉÆjÉ{ÉhÉä EòÉføÉ´Éä ±ÉÉMÉiÉä.
(6) ºÉÉ´ÉÇVÉÊxÉEò ¤ÉÉÆvÉEòÉ¨É JÉÉiÉä nù®ú´É¹ÉÔ ............... |ÉʺÉrù Eò®úiÉä, VªÉɨÉvªÉä Eò±É¨ÉÉÆSÉÉ
|ÉÊiÉ BEòEò nù®ú Ênù±Éä±ÉÉ +ºÉiÉÉä.
(¤É÷) VÉÉäb÷¬É ±ÉÉ´ÉÉ (EòÉähÉiªÉɽþÒ {ÉÉSÉ) :---- 5
‘ + ’ MÉ]õ ‘ ¤É ’ MÉ]õ
(1) iÉ{ɶÉÒ±É {ÉjÉEò (+) EòÉ¨É ºÉÖ°ü Eò®úhÉä¤ÉɤÉiÉ
EÆòjÉÉ]õnùÉ®úÉºÉ {ÉjÉ.
(2) nù®ú {ÉÞlÉCEò®úhÉ (¤É) EòɨÉMÉÉ®úÉxÉä 8 iÉɺÉÉiÉ Eäò±Éä±Éä EòɨÉ
(3) EòɪÉÉÇnäù¶É (Eò) Eò±É¨ÉÉSÉÒ Ê´ÉºiÉÞiÉ ¨ÉÉʽþiÉÒ
(4) ¤ÉªÉÉhÉÉ (+xÉæº] õ¨ÉxÉÒ) (b÷) |ÉEò±{ÉÉSªÉÉ JÉSÉÉÇSÉÉ +ÆnùÉVÉ
(5) ]õɺEò ´ÉEÇò (<) |ÉiªÉäEò Eò±É¨ÉÉSÉÉ |ÉÊiÉ BEòEò nù®ú
(6) Bº]õÒ¨Éä]õ (+ÆnùÉVÉ{ÉjÉEò) (¡ò) +ÆnùÉÊVÉiÉ ËEò¨ÉiÉÒSªÉÉ 2 ]õCEäò
(Eò) SÉÚEò EòÒ ¤É®úÉä¤É®ú iÉä ʱɽþÉ (EòÉähÉiÉä½þÒ {ÉÉSÉ) :— 5
(1) ºÉÖ®úIÉÉ `äö´É ½þÒ +ÆnùÉVÉ{ÉjÉEòÉSªÉÉ ËEò¨ÉiÉÒSªÉÉ 2.5 ]õCEäò iÉä 10 ]õCEäò +ºÉiÉä.
(2) ÊEò¨ÉÉxÉ ´ÉäiÉxÉ EòɪÉnùÉ, 1948 ºÉɱÉÒ iɪÉÉ®ú Eò®úhªÉÉiÉ +ɱÉÉ.
(3) ¨ÉÉäVɨÉÉ{É {ÉjÉEòÉiÉ Eò±É¨ÉÉSÉä nù®ú Ênù±Éä±Éä +ºÉiÉÉiÉ.
(4) ÊMɱÉÉ´ÉÉ EòɨÉÉSÉä BEòEò PÉxɨÉÒ]õ®ú +ɽäþ.
(5) ÊxÉÊ´ÉnùÉ ®úqù ZÉɱªÉÉ´É®ú ¤ÉªÉÉhÉÉ {É®úiÉ Eäò±ÉÉ VÉÉiÉÉä.
×
× (6) ºÉÖvÉÉÊ®úiÉ +ÆnùÉVÉ{ÉjÉEò ½þÉ ºÉʴɺiÉ®ú +ÆnùÉVÉ{ÉjÉEòÉSÉÉ |ÉEòÉ®ú +ɽäþ.
× (b÷) ʴɺiÉÉÊ®úiÉ °ü{É tÉ (EòÉähÉiÉä½þÒ {ÉÉSÉ) :---- 5
(1) M.B. (2) C.L.M. (3) D.S.R.
(4) N.M.R. (5) P.W.D. (6) R.C.C.
[=±É]ÚõxÉ {ɽþÉ
CON 1053 2
MÉÖhÉ
2. JÉɱÉÒ±É{ÉèEòÒ EòÉähÉiÉä½þÒ nùÉäxÉ |ɶxÉ ºÉÉäb÷´ÉÉ :---- 16
(+) ºÉʴɺiÉ®ú +ÆnùÉVÉ{ÉjÉEò ´É +ÆnùÉÊVÉiÉ +ÆnùÉVÉ{ÉjÉEòÉiÉÒ±É ¡ò®úEò º{ɹ]õ Eò®úÉ
(¤É) 10 PÉxÉ Ê¨É]õ®ú ±ÉÉƤÉ, 2 PÉxÉ Ê¨É]õ®ú =ÆSÉ ´É 30 ºÉå. ¨ÉÒ. VÉÉb÷ÒSªÉÉ Ê´É]õÉÆSªÉÉ Ë¦ÉiÉÒºÉÉ`öÒ
±ÉÉMÉhÉɪÉÉ ºÉÉʽþiªÉÉSÉÒ C´ÉÉÆ]õÒ]õÒ EòÉføÉ. ʺɨÉå]õ ¨ÉºÉɱÉÉ |ɨÉÉhÉ (1 : 5)
(Eò) iÉ{ɶÉÒ±É{ÉjÉEòÉSÉÒ ´ªÉÉJªÉÉ ºÉÉÆMÉÉ ´É ºÉʴɺiÉ®ú iÉ{ɶÉÒ±É{ÉjÉEò º{ɹ]õõ Eò®úÉ.
(b÷) 10 SÉÉè. ʨÉ]õ®ú EòÉäºÉÇ ®ú¤É±É ¨ÉäºÉxÉ®úÒ, ˺ɨÉä]õ ¨ÉºÉɱÉÉ (1 : 3) ¨ÉvªÉä Eò®úhªÉɺÉÉ`öÒ
±ÉÉMÉhÉɪÉÉ ºÉÉʽþiªÉÉSÉÒ C´ÉÉÆ]õÒ]õÒ EòÉføÉ.
3. ºÉÉä¤ÉiÉ Ênù±É䱪ÉÉ +ÉEÞòiÉÒ´É°üxÉ JÉɱÉÒ±É{ÉèEòÒ EòÉähÉiªÉɽþÒ nùÉäxÉ Eò±É¨ÉÉÆSÉÒ C´ÉÉÆ]õÒ]õÒ 16
EòÉføÉ :----
MÉÖhÉ
6. JÉɱÉÒ±É{ÉèEòÒ EòÉähÉiÉä½þÒ nùÉäxÉ |ɶxÉ ºÉÉäb÷´ÉÉ :---- 16
(+) JÉÉiªÉɨÉÉ¡ÇòiÉ EòÉ¨É Eò®úhªÉÉSÉÒ {ÉrùiÉÒ º{ɹ]õ Eò®úÉ.
(¤É) näùªÉEòÉSÉä |ÉEòÉ®ú ºÉÉÆMÉÉ ´É näùªÉEò iÉ{ÉɺÉiÉÉÆxÉÉ ±ÉIÉÉiÉ PªÉɴɪÉÉSÉä EòÉähÉiÉä½þÒ {ÉÉSÉ ¨ÉÖqùä ºÉÉÆMÉÉ.
(Eò) ºÉÉ´ÉÇVÉÊxÉEòú ¤ÉÉÆvÉEòÉ¨É Ê´É¦ÉÉMÉ, ¨ÉÖƤÉ<Ç ¯û. 50.00 EòÉä]õÒ +ÆnùÉÊVÉiÉ ËEò¨ÉiÉÒSªÉÉ EòɪÉÉDZɪÉ
<¨ÉÉ®úiÉÒSªÉÉ ¤ÉÉÆvÉEòɨÉɺÉÉ`öÒ ÊxÉÊ´ÉnùÉ ¨ÉÉMÉÊ´ÉiÉ +ɽäþ. iªÉɺÉÉ`öÒ xɨÉÖxÉÉ ÊxÉÊ´ÉnùÉ ºÉÚSÉxÉÉ
iɪÉÉ®ú Eò®úÉ (+ɴɶªÉEò iÉÒ ¨ÉÉʽþiÉÒ MÉÞ½þÒiÉ vÉ®úÉ).
(b÷) ºÉÚSÉÒ-+ ´É ºÉÚSÉÒ-¤É ¨½þhÉVÉä EòÉªÉ ? iªÉÉÆSÉä xɨÉÖxÉÉ iÉCiÉä iɪÉÉ®ú Eò®úÉ.
CON 1053 4
(ENGLISH)
[TIME ALLOWED—3 HOURS]
(MARKS—100)
ESTIMATING AND COSTING (THEORY–2)
Marks
1. (a) Fill in the blanks with appropriate word (any five) :— 5
(i) Revised estimate is a type of ....................... estimate.
(ii) The approximate cost of the project considering market rates is
called .......................
(iii) In the detailed estimate, the cost of the item is recorded in the
....................... sheet.
(iv) The ....................... gives information about the accurate
discription of the work, material, quantity and workmanship.
(v) In the civil engineering works the ............................ of each
item is to be calculated separately.
(vi) The public works dept, publishes ....................... every year,
which gives rates of various items per unit.
5
(b) Match the pairs (any five) :—
Group “A” Group “B”
(i) Specifications (a) Letter to contractor for
commencing the work.
(ii) Analysis of rates (b) Work done in 8 hrs by a
labour.
(iii) Work order (c) Detailed information of
items.
(iv) Earnest money (d) Approximate cost of the
project.
(v) Task work (e) Rate per unit of a item
(vi) Estimate (f) 2 % of the estimated cost.
(c) State the following statements are true / false (any five) :— 5
(i) Security deposit is about 2.50 % to 10 % of the estimated cost.
(ii) Minimum Wages Act is formed in 1948.
(iii) In the measurement sheet the rates of’ each item are given.
(iv) The unit of measurement of plaster work is cubic meter.
(v) On the cancelation of tender the earnest money deposite is
refunded.
(vi) The revised estimate is as same of detailed estimate.
(d) Write the extended form of the following (any five) :— 5
(i) MB (ii) CLM (iii) DSR
(iv) NMR (v) PWD (vi) RCC
[Turn over
CON 1053–2 5
Marks
2. Solve any two of the following :— 16
(a) Differentiate between detailed estimate and apporoximate estimate
(b) Calculate the quantity of materials of a brick wall of 10 cubic meter
long, 2 cubic meter high and 30 cm thick. Assume the proportion of
C.M. is 1 : 5
(c) Define the ‘ Specification ’ and discribe the ‘ Detailed Specification.’
(d) Calcutate the quantities of materials of Course Rubble Masonry of
10 sq. m, using proportion of CM. is 1 : 3.
3. Calculate the quantity of any two items of the following from the given 16
Diagram No. l :—
Marks