Vous êtes sur la page 1sur 6

CON 1710--1 Serial No.

30420212
[¨É®úÉ`öÒ] [<ÆOÉVÉÒ]
MAHARASHTRA STATE BOARD OF VOCATIONAL EDUCATION EXAMINATIONS, MUMBAI
Examination, April, 2015
CERTIFICATE COURSE IN CONSTRUCTION SUPERVISOR

[´Éä³ý---3 iÉɺÉ]
(BEÚòhÉ MÉÖhÉ---100)
<κ]õ¨ÉäË]õMÉ +ìhb÷ EòÉìϺ]õMÉ (ÊlÉ+®úÒ-2)
ºÉÚSÉxÉÉ.---- (1) ºÉ´ÉÇ |ɶxÉ ºÉÉäb÷Ê´ÉhÉä +ɴɶªÉEò +ɽäþiÉ.
(2) =VÉ´ÉÒEòb÷Ò±É +ÆEò {ÉÚhÉÇ MÉÖhÉ nù¶ÉÇÊ´ÉiÉÉiÉ.
(3) +ɴɶªÉEò iÉälÉä +ÊvÉEò ¨ÉÉʽþiÉÒ MÉÞʽþiÉ vÉ®úÉ.
(4) +ɴɶªÉEò iÉälÉä +ÉEÞòiÉÒ EòÉføÉ.
MÉÖhÉ
1. (+) Ê®úEòɨªÉÉ VÉÉMÉÉ ¦É®úÉ (EòÉähÉiªÉɽþÒ {ÉÉSÉ) :---- 5
(1) <κ]õ¨Éä]õ EòÉføhªÉÉSÉÒ VɱÉnù {ÉrùiÉÒ .................. ½þÒ +ɽäþ.
(2) .................... ½þÒ <κ]õ¨Éä]õ EòÉføhªÉÉSÉÒ iÉEÇòºÉÆMÉiÉ {ÉrùiÉÒ +ɽäþ.
(3) {ÉÚhÉÇ {Éè¶ÉÉÆSÉÒ .................... <iÉEòÒ ¶ÉäEòbä÷´ÉÉ®úÒ ½þÒ +ìxÉÇ ¨ÉxÉÒ +ºÉiÉä.
(4) Ê{ÉSÉ {ÉrùiÉÒSªÉÉ ¤ÉÉÆvÉEòɨÉÉSªÉÉ <κ]õ¨Éä]õ ºÉÉ`öÒ PÉ®úÉSÉÒ =ÆSÉÒ .................... ½þÒ
PÉäiÉÉiÉ.
(5) +vÉÇ ´ÉiÉÖdzýÉEòÉ®ú ½ÚþEòSÉÒ ½ÚþEò ±ÉÉƤÉÒ .................... ½þÒ +ºÉiÉä.
(6) ±ÉÉEòb÷Ò ¦ÉÉMÉÉ´É®ú +Éì<Ç±É {Éå]õºÉÉ`öÒ ................... ½þÉ ¨É±]õÒ{±ÉÉ<ÈMÉ ¡ìòC]õ®ú
+ºÉiÉÉä.
(¤É) VÉÉäb÷¬É VÉÖ³ý´ÉÉ :----- 5
‘ö + ’ ö‘ö ¤É ’ö
(1) EòÉÄGòÒ] (+) õ±ÉÒ]õ®ú
(2) Ê´É]õÉ (¤É) ¨ÉÒ 3
(3) ʺɨÉå] (Eò) ¨ÉÒ 2
(4) {±Éɺ]õ® (b÷) ú¤ÉìMÉ
(5) {Éå] (<) õxÉƤɮú

(Eò) ʴɺiÉÉÊ®úiÉ ¯û{É tÉ (EòÉähÉiÉä½þÒ {ÉÉSÉ) :---- 5


(1) MHADA (2) CIDCO (3) IDCO (4) PWD
(5) DSR (6) R.C.C.

(b÷) SÉÚEò EòÒ ¤É®úÉä¤É®ú iÉä ʱɽþÉ (EòÉähÉiÉä½þÒ {ÉÉSÉ) :---- 5


(1) Êb÷]äõ±É <κ]õ¨Éä]õ{ÉäIÉÉ +ì|ÉÉìCºÉÒ¨Éä]õ <κ]õ¨Éä]õ ½þÒ ¤É®úÉä¤É®ú =kÉ®ú näùiÉä.
× (2) ËEò¨ÉiÉ EòÉføhªÉɺÉÉ`öÒ +ì¤Éº]ÅìõEò ¶ÉÒ]õSÉÉ ´ÉÉ{É®ú Eò®úiÉÉiÉ.
× (3) EòÉÄ]ÅõC]õ +ÉÊhÉ ]åõb÷®ú ½þÒ ºÉÉ®úJÉÒ +ɽäþiÉ.
× (4) Eò¨ÉÒ ¦ÉÉ´ÉÉSÉä ]åõb÷®ú xÉä½þ¨ÉÒ º´ÉÒEòÉ®ú±Éä VÉÉiÉÉiÉ.
(5) P.W.D. +ÉìMÉÇxÉɪÉZÉä¶ÉxɨÉvªÉä ¨ÉÖJªÉ +ʦɪÉÆiÉÉ ½þÉ ºÉ´ÉÉÇiÉ ¨ÉÉä`öÉ +ºÉiÉÉä.
(6) {±ÉÒxlÉ IÉäjÉ¡ò³ý {ÉrùiÉ ½þÒ Êb÷]äõ±É <κ]õ¨Éä]õSÉÒ {ÉrùiÉ +ɽäþ.
[=±É]ÚõxÉ {ɽþÉ
CON 1710 2

MÉÖhÉ
2. EòÉähÉiÉä½þÒ nùÉäxÉ |ɶxÉ ºÉÉäb÷´ÉÉ :---- 16
(+) <κ]õ¨Éå]õ ¨½þhÉVÉä EòÉªÉ ? ´É iªÉÉSÉä ¨É½þk´É ʱɽþÉ.
(¤É) <κ]õ¨Éå]õSÉä |ÉEòÉ®ú ºÉÉÆMÉÉ +ÉÊhÉ +ì|ÉÉìCºÉÒ¨Éä]õ <κ]õ¨Éå]õ ºÉʴɺiÉ®ú º{ɹ]õ Eò®úÉ.
(Eò) BEò ¨ÉÉhÉÚºÉ VªÉÉ VÉÉMÉäSÉÒ ËEò¨ÉiÉ 95,000 ¯û{ɪÉä B´ÉføÒ +ºÉiÉä iªÉÉ´É®ú 100 ¨ÉÒ {±ÉÒxlÉ
IÉäjÉ¡ò³ýÉiÉ ¤ÉÉÆvÉEòÉ¨É Eò®úiÉÉä PÉ®úÉSÉÒ =ÆSÉÒ VÉʨÉxÉÒ{ÉɺÉÚxÉ iÉä UôiÉÉ{ɪÉÈiÉ 3.5 ¨ÉÒ. +ɽäþ.
UôiÉÉ´É®ú ¤ÉÉÆvɱÉ䱪ÉÉ {Éì®úÉ{ÉÒ]õ ˦ÉiÉÒSÉÒ =ÆSÉÒ 80 ºÉä¨ÉÒ. +ɽäþ. iªÉÉSÉ {ÉÊ®úºÉ®úÉiÉ ¤ÉÉÆvɱÉ䱪ÉÉ
135 ¨ÉÒ 2. B´Éfø¬É Î{±ÉxlÉ IÉäjÉ¡ò³ý +ºÉ±É䱪ÉÉ PÉ®úÉSÉÒ ËEò¨ÉiÉ Î{±ÉxlÉ B®úÒªÉÉ {ÉrùiÉ
´É ´½þÉ챪ÉÚ¨É ®äú]õ {ÉrùiÉÒxÉä EòÉføÉ.
(b÷) Êb÷]äõ±É <κ]õ¨Éå]õ ¨½þhÉVÉä EòÉªÉ ? +ÉÊhÉ iªÉÉSÉä ={ɪÉÉäMÉ Ê±É½þÉ.
3. Ênù±É䱪ÉÉ +ÉEÞòiÉÒ´É°üxÉ JÉɱÉÒ±É{ÉèEòÒ EÖò`ö±ªÉɽþÒ nùÉäxÉ ´ÉºiÉÖÆSÉä <κ]õ¨Éä]õ ºÉå]õ®ú ±ÉÉ<ÇxÉ {ÉrùiÉÒxÉä 16
EòÉføÉ (+ÉEÞòiÉÒ Gò. 1) :----
(+) (1) +lÉÇ´ÉEÇò <xÉ ¡òÉ>ðbå÷¶ÉxÉ
(2) ¡òÉ>Æðbä÷¶ÉxɨÉvÉÒ±É ¡òº]Çõ C±ÉÉºÉ Ê´É]äõSÉä ¤ÉÉÆvÉEòɨÉ.
(¤É) ¡òÉ>Æðbä÷¶ÉxɨÉvÉÒ±É ±ÉÉ<Ç¨É EòÉÄGòÒ]õ.
(Eò) ºÉÖ{É®úº]ÅìõCSÉ®ú¨ÉvÉÒ±É Ê´É]äõSÉä ¤ÉÉÆvÉEòɨÉ.
(b÷) ºÉÖ{É®úº]ÅìõCSÉ®ú¨ÉvÉÒ±É {±Éɺ]õ®úÓMÉ.
4. EòÉähÉiÉä½þÒ nùÉäxÉ |ɶxÉ ºÉÉäb÷´ÉÉ :---- 16
(+) ¤ÉÉÆvÉEòɨÉÉSÉä/¨ÉÉäVÉhªÉÉSÉä BEòEò `ö®úÊ´ÉiÉÉÆxÉÉ EÖò`ö±ªÉÉ MÉÉä¹]õÒ ±ÉIÉÉiÉ `äö´ÉÉ´ªÉÉ ?
(¤É) ®äú]õ +ìxÉÉʱÉÊºÉºÉ ¨½þhÉVÉä EòÉªÉ +ɽäþ ? ´É iªÉÉSÉÒ MÉ®úVÉ Ê±É½þÉ.
(Eò) 10 ¨ÉÒ 3 ¡òÉ>Æðbä÷¶ÉxÉSÉä ®äú]õ +ìxÉäʱɺÉÒºÉ EòÉføÉ.
(b÷) 10 ¨ÉÒ 2 {±Éɺ]õË®úMÉ C.M. (1:4) SÉä ®äú]õ +ìxÉÉʱɺÉÒºÉ EòÉføÉ.
5. Êb÷]äõ±É º{ÉäʺÉÊ¡òEäò¶ÉxÉ Ê±É½þÉ. (EòÉähÉiªÉɽþÒ SÉÉ®ú) :---- 16
(+) (1:6) CM ¨ÉvÉÒ±É Ê´É]äõSÉä ¤ÉÉÆvÉEòɨÉ.
(¤É) C.M. (1:4) ¨ÉvÉÒ±É {±Éɺ]õ®úÓMÉ.
(Eò) R.C.C. (1:2:4).
(b÷) ºÉÉì}]õ ¨ÉÉiÉÒiÉÒ±É JÉÉänùEòɨÉ.
(<) {Éä]õÓMÉ.

6. EòÉähÉiÉä½þÒ nùÉäxÉ |ɶxÉ ºÉÉäb÷´ÉÉ :---- 16


(+) ]åõb÷®ú ¨½þhÉVÉä EòÉªÉ ? ´É iªÉÉSÉÒ MÉ®úVÉ Ê±É½þÉ. +ÉÊhÉ ]åõb÷®ú ¤ÉxÉÊ´ÉiÉÉxÉÉ ±ÉIÉÉiÉ `äö´ÉɴɪÉÉSªÉÉ
MÉÉä¹]õÒ ºÉÉÆMÉÉ.
(¤É) EòÉìx]ÅõC]Åõ®ú±ÉÉ {ÉèºÉä näùhªÉÉSªÉÉ ´ÉäMÉ´ÉäMɳ¬É {ÉrùiÉÒ ºÉÉÆMÉÉ ´É º{ɹ]õ Eò®úÉ.
(Eò) EòÉìx]ÅõC]õSªÉÉ ´ÉäMÉ´ÉäMɳ¬É EÆòb÷Ò¶ÉxÉ ºÉÉÆMÉÉ.
(b÷) JÉÉänù EòÉ¨É Eò®úhªÉÉSªÉÉ ´ÉäMÉ´ÉäMɳ¬É {ÉrùiÉÒ ºÉÉÆMÉÉ ´É ºÉʴɺiÉ®ú º{ɹ]õ Eò®úÉ.
CON 1710--2 3

|ɶxÉ Gò. 3 ºÉÉ`öÒ JÉɱÉÒ±É|ɨÉÉhÉä +ɽäþ :----

(+ÉEÞòiÉÒ Gò. 1)
[Turn over
CON 1710 4

(ENGLISH)
[TIME ALLOWED—3 HOURS]
(MARKS—100)
ESTIMATING AND COSTING (THEORY--II)

Instructions.—(1) All questions are compulsory.


(2) Figures to the right indicate full marks.
(3) Assume suitable additional data if necessary.
(4) Draw the suitable diagram, wherever necessary.
Marks

1. (a) Fill in the blanks (any five) :— 5


(i) The fastest method of estimate calculation is .................. .
(ii) .................... it is more rational method of estimate.
(iii) The percentage of earned money is .................... of total cost.
(iv) The height of building is .................... for calculation of quan-
tity for pitched structure.
(v) Hork length of semi-circular hook is .................... .
(vi) Multiplying factor for oil painting on wood surface .................. .

(b) Match the following :— 5


‘A ’ Group ‘ B ’ Group
(i) Concrete (a) litre
(ii) Bricks (b) m3
(iii) Cement (c) m2
(iv) Plaster (d) bag
(v) Paint (e) Nos.

(c) Write the full form of following (any five) :— 5


(i) MHADA, (ii) CIDCO, (iii) IDCO,
(iv) PWD, (v) DSR, (iv) R.C.C.

(d) State true or false (any five) :— 5

(i) Approximate estimate is more accurate than detail estimate.


(ii) Abstract sheet is used for rate calculation.
(iii) Contract and tender are the same.
(iv) Lowest rate tenders are always accepted.
(v) Chief engineer is at the top of P.W.D. organisation.
(vi) Plinth area method is the method for detail estimate.
CON 1710 5 Marks
2. Solve any two :— 16
(a) Define estimate and its purpose.
(b) Give the types of estimate and explain approximate estimate in detail.
(c) A person constructs a building of plinth area equal to 100 sq.m. and
plot of land in a certain locality at a cost of Rs. 95,000. The height
of the building from ground level to the top of roof is 3.5 m as
parapet wall on height equal to 80 cm. is constructed on the terrace.
Determine the cost of simular building and plinth area equal
135 m2 to be constructed in the same locality by plinth area rate
and also by volume rate.
(d) Define detail estimate and its uses.

3. Solve any two :— 16


Use the diagram (Plan & Section) given for the Calculation of detailed
estimate by centre line method (Fig. 1) :—
(a) (i) earthwork in foundation.
(ii) 1st class brick in foundation.
(b) Lime concrete in foundation.
(c) Brick work in superstructure.
(d) Plaster in superstructure.

4. Solve any two :— 16


(a) State the points to be considered while fixing unit of measurement.
(b) Define rate analysis and its necessity.
(c) Prepare a rate analysis for 10 m3 excavation.
(d) Prepare a rate analysis for 10 m2 plastering with C.M. (1:4).

5. Give the detail specification of following (any four) :— 16


(a) Brick work in C.M.(1:6)
(b) Plastering with C.M. (1:4)
(c) R.C.C. work with proportion of concrete (1:2:4).
(d) Excavation in soft soil.
(e) Painting.

6. Solve any two :— 16


(a) Define tender and its necessity also point to be considered while
framing Tender Notice.
(b) State various modes of payment to contractor and Explain it.
(c) Give various conditions of contract.
(d) Give various methods of execution of work and explain them in detail.

[Turn over
CON 1710 6

Question No. 3 of the following :—