Vous êtes sur la page 1sur 12

Metrado de CONECTOR DE BRONCE DOS

Tipo de Tiene Total PAT en Total PAT en CONECTOR DE BRONCE EN CONECTOR DE BRONCE EN TOTAL DE CONECTOR DE TOTAL DE CONECTOR DE CONECTOR BIMETALICO DE TOTAL DE CONECTOR BRAZO SOPORTE BRAZO SOPORTE PAT Varilla
Item Cantidad acuerdo a Brazo Izq. Brazo Der. Codigo Plano de Referencia VIAS DOS TAPAS EN "J" CLAVOS "U" PAT Varilla
Armado Memoria Poste Poste 5% CRUCETA CRUCETA BRONCE DE DOS VIAS BRONCE DE DOS VIAS DOBLE VIA BIMETALICO DE DOBLE VIA ANGULAR IZQ. ANGULAR DER. 5%
Plano PARA PERNO DE ꬾ 3/4"
1 8 HA1 1 52.52 55 60 MQ13-189-DR-5210-EE4018 10 6 16 128 1 8 176 0 0 0
2 6 HA32 1 58.02 61 66 MQ13-189-DR-5210-EE4012 19 8 27 162 1 6 194 0 0 0
3 8 HR 1 49.32 52 53 MQ13-189-DR-5210-EE4017 4 12 16 128 1 8 165 0 0 0
4 1 HR2 1 56.12 59 40 MQ13-189-DR-5210-EE4011 7 16 23 23 1 1 188 0 0 0
5 4 HS 1 49.32 52 53 MQ13-189-DR-5210-EE4015 4 12 16 64 1 4 165 0 0 0
6 4 HS2 1 56.12 59 60 MQ13-189-DR-5210-EE4010 7 16 23 92 1 4 188 0 0 0
7 1 HT 1 55.22 58 60 MQ13-189-DR-5210-EE4021 13 16 29 29 1 1 185 0 0 15.5 16
8 2 HT2 1 59.67 63 50 MQ13-189-DR-2030-EE4013 25 28 53 106 1 2 200 0 0 17.16 18
9 2 HTT 53.42 56 50 MQ13-189-DR-5210-EE4024 6 16 22 44 1 2 179 0 0 11.21 12
10 1 HTB 56.62 59 60 MQ13-189-DR-5210-EE4356 13 16 29 29 1 1 189 0 0 11.21 12
11 1 HRT 56.62 59 60 MQ13-189-DR-5210-EE4364 18 16 34 34 189 0 0
12 36 PA1 1 22.01 23 29 MQ13-189-DR-5210-EE4019 9 0 9 324 1 36 74 0 0 0
13 9 PA1-D 0.9 1 MQ13-189-DR-1140-EE4341 3 0 3 27 2 18 4 0 0 0
14 2 PA1C 22.01 23 29 MQ13-189-DR-1140-EE4019 8 0 8 16 74 0 0
15 2 PRC 25.85 27 31 3 3 MQ13-189-DR-1140-EE4016 9 4 13 26 87 6 6
16 2 PA3C 22.01 23 29 MQ13-189-DR-1140-EE4020 8 0 8 16 74 0 0
17 1 PA3C-D 0.9 1 3 0 3 3 4 0 0
18 3 PSC 25.85 27 30 2 1 MQ13-189-DR-1140-EE4014 6 0 6 18 87 6 3
19 12 PA1SEC 19.21 20 50 MQ13-189-DR-2030-EE4301 9 0 9 108 1 12 65 0 0 19.81 20 Revisar en Campo
20 PA1SECD 0 0 MQ13-189-DR-2030-EE4341 3 0 3 0 1 0 0
21 19 PA3 1 22.01 23 29 MQ13-189-DR-5210-EE4020 8 0 8 152 1 19 74 0 0 0
22 6 PA3-D 0.9 1 3 0 3 18 4 0 0
23 1 PA3+1 22.01 23 29 MQ13-189-DR-5210-EE4367 8 0 8 8 74 0 0
24 0 PA3SEC 0 0 MQ13-189-DR-6050-EE4340 3 0 3 0 1 0 0
25 1 PA4 22.01 23 MQ13-189-DR-5210-EE4366 6 0 6 6 1 1 74 0 0
26 2 PA4-D 0.9 1 6 0 6 12 4 0 0
27 2 PA1-3 22.01 23 MQ13-189-DR-6050-EE4319 9 0 9 18 2 4 74 0 0
28 1 PA1-5 22.01 23 30 MQ13-189-DR-1140-EE4010 6 0 6 6 2 2 74 0 0 0
29 0 PA1-5-D 0.9 1 3 0 3 0 4 0 0
30 1 PA1-5D 22.01 23 MQ13-189-DR-1140-EE4340 9 0 9 9 74 0 0
31 1 PD 22.41 24 30 MQ13-189-DR-5210-EE4023 11 0 11 11 2 2 75 0 0 0
32 14 PR 1 25.85 27 31 3 3 MQ13-189-DR-5210-EE4016 5 4 9 126 1 14 87 42 42 0
33 1 PR-D 6.64 7 2 2 MQ13-189-DR-5210-EE4026 3 4 7 7 2 2 23 2 2 0
34 6 PREC 26.49 28 31 3 3 MQ13-189-DR-2030-EE4302 5 4 9 54 1 6 89 18 18 11.802 12
35 8 PS 1 25.85 27 30 2 1 MQ13-189-DR-5210-EE4014 6 4 10 80 1 8 87 16 8 0
36 5 PT 1 28.89 30 30 4 4 MQ13-189-DR-5210-EE4022 13 6 19 95 1 5 97 20 20 12.94 13
37 1 PTS 28.89 30 30 4 4 MQ13-189-DR-5210-EE4361 13 6 19 19 97 4 4
38 2 PTB 28.89 30 30 4 4 MQ13-189-DR-5210-EE4025 13 6 19 38 1 2 97 8 8 12.94 13
39 1 PTBS 28.89 30 30 4 4 MQ13-189-DR-5210-EE4362 13 6 19 19 97 4 4
40 0 PRECP 26.49 28 3 3 5 6 11 0 1 0 89 0 0 19.81 20
41 1 PRECB 26.49 28 50 3 3 MQ13-189-DR-5210-EE4355 5 4 9 9 1 1 89 3 3 19.81 20
42 2 PRECT 26.49 28 50 3 3 MQ13-189-DR-5210-EE4354 5 4 9 18 1 2 89 6 6 19.81 20
43 0 PRECTC 26.49 28 3 3 5 4 9 0 1 0 89 0 0 19.81 20
44 4 PTT 1 6 6 7 MQ13-189-DR-5210-EE4116 0 0 0 0 1 4 21 0 0 4.8 5
45 4 P 1 22.01 23 29 MQ13-189-DR-2030-EE5000 9 0 9 36 1 4 74 0 0
46 4 PP 1 22.01 23 29 3 3 ARMADO PARARRAYO PP 9 0 9 36 1 4 74 12 12
47 1 SAB1 54.42 57 80 MQ13-189-DR-2030-EE4303 12 20 32 32 1 1 182 0 0 14.3 15 L31-7 10kVA Desvio Rio Asana
48 1 SAB2 63.92 67 60 MQ13-189-DR-5210-EE4135 6 20 26 26 1 1 214 0 0 16.2 17 L14-6 500kVA Polvorin y Almacenamiento de Nitratos
49 0 SAB3 57.62 61 60 MQ13-189-DR-5210-EE4140 13 20 33 0 1 0 193 0 0 14.94 15 L20-2 10kVA Patio de Valvulas
50 1 SAB4 63.92 67 60 MQ13-189-DR-5210-EE4141 6 20 26 26 1 1 214 0 0 16.2 17 L12-7 400kVA Patio de Desechos
51 1 SAB5 57.62 61 60 MQ13-189-DR-5210-EE4142 13 20 33 33 1 1 193 0 0 14.94 15 L15-2 75kVA Alta Montaña Tanque
52 1 SAB6 57.62 61 60 MQ13-189-DR-5210-EE4143 13 20 33 33 1 1 193 0 0 14.94 15 L18-3 250kVA Testigoteca
53 1 SAB7 57.62 61 60 MQ13-189-DR-5210-EE4144 13 20 33 33 1 1 193 0 0 14.94 15 L17-3 250kVA Planta Osmosis
54 1 SAB8 57.62 61 60 MQ13-189-DR-5210-EE4146 13 20 33 33 1 1 193 0 0 14.94 15 L32-1 250kVA Planta de Tratamiento Aguas Servidas
55 1 SAB9 57.62 61 60 MQ13-189-DR-5210-EE4147 13 20 33 33 1 1 193 0 0 14.94 15 L55-1 50kVA Estacion de combustible
56 1 SAB10 57.62 61 60 MQ13-189-DR-5210-EE4148 13 20 33 33 1 1 193 0 0 14.94 15 L5-17 150kVA Garita de Acceso
57 0 SAB11 0 0 0 0 0 1 0 0 0
58 1 SAB12 70.74 74 200 MQ13-189-DR-1140-EE4013 27 27 54 54 0 0 237 0 0 0
59 1 SAB12-D 0 4 4 3 3 6 6 1 4 4
60 1 SAB51 82.234 86 60 MQ13-189-DR-5210-EE4467 6 24 30 30 1 1 275 0 0 24.486 25
61 0 SABT 6.64 7 0 0 23 0 0
62 0 SABT-D 0 0 1 0 0
63 6 SABC 57.62 61 60 MQ13-189-DR-1140-EE4011 13 13 78 1 6 193 0 0 13.34 14
64 Torres 2.7 3 0 MQ13-189-DR-5210-EE6003 0 0 0 10 15 16 0
210 Total= 2604 Total= 199 166 156
Total Grapas "J" Retenida= 591 300 64
Total= 3195 92
Total (mas 3%)= 3291 Total (mas 3%)= 205
METRADO ALTURA Y PESOS TORRES 22.9kV
PROYECTO: 22.9 kV AND 60 kV OVERHEAD POWER DISTRIBUTION
CONTRATO: K-EPCN-154C

LINEA 2030-LA-001
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L6-10 A2+0 A 4,794 32.2 26.5 23.5 20.5
L6-11 A2-3 A 4,262 29.2 23.5 20.5 17.5
L6-12 A2+0 A 4,794 32.2 26.5 23.5 20.5
L6-20 A2-3 A 4,262 29.2 23.5 20.5 17.5
L6-22 T2+0 A 5,326 32.2 26.9 23.9 20.9
L6-23 A2-3 A 4,262 29.2 23.5 20.5 17.5
L6-24 T2-3 A 4,502 29.2 23.9 20.9 17.9
LINEA 5210-LA-001
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L1-7 TA+6 A 3,910 35.4 31.5 29.5 29.5
L1-10 A1-6 A 2,668 21.3 17.0 15.0 13.0
L1-11 A1-6 A 2,668 21.3 17.0 15.0 13.0
L1-12 A1+0 A 3,704 27.3 23.0 21.0 19.0
L1-13 A1-6 A 2,668 21.3 17.0 15.0 13.0
L1-14 T1+0 A 4,892 27.8 23.0 21.0 19.0
L1-19 TA+12 A 4,888 38.4 34.5 32.5 32.5
L1-21 T1+6 A 6,219 33.8 29.0 27.0 25.0
L1-22 A1+0 A 3,704 27.3 23.0 21.0 19.0
L1-23 T1+3 A 5,519 30.8 26.0 24.0 22.0
LINEA 5210-LA-002
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L2-10 A1-6 A 2,668 21.3 17.0 15.0 13.0
L2-12 A1-3 A 3,256 24.3 20.0 18.0 16.0
LINEA 2030-LA-002
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L7-3 A1+0 A 3,704 27.3 23.0 21.0 19.0
L7-4 TA+12 A 4,888 38.4 34.5 32.5 32.5
L7-12 T1+6 A 6,219 33.8 29.0 27.0 25.0
L7-14 TA+3 A 3,486 32.4 28.5 26.5 26.5
L7-26 A1+3 A 4,317 30.3 26.0 24.0 22.0
L7-27 A1-3 A 3,256 24.3 20.0 18.0 16.0
L7-28 T1-6 A 3,505 21.8 17.0 15.0 13.0
LINEA 2030-LA-003
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L8-6 A1+0 A 3,704 27.3 23.0 21.0 19.0
L8-7 T1-6 A 3,505 21.8 17.0 15.0 13.0
L8-8 T1-6 A 3,505 21.8 17.0 15.0 13.0
L8-11 T1-6 A 3,505 21.8 17.0 15.0 13.0
L8-17 T1-6 A 3,505 21.8 17.0 15.0 13.0
L8-18 T1-6 A 3,505 21.8 17.0 15.0 13.0
LINEA 5210-LA-121
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L121-2 TA-6 A 2,287 23.4 19.5 17.5 17.5
L121-3 TA-6 A 2,287 23.4 19.5 17.5 17.5
L121-4 TA-6 A 2,287 23.4 19.5 17.5 17.5
L121-5 TA-6 A 2,287 23.4 19.5 17.5 17.5
L121-6 TA+6 A 3,910 35.4 31.5 29.5 29.5
LINEA 5210-LA-014
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L14-1 TA+0 A 3,124 29.4 25.5 29.5 29.5
LINEA 5210-LA-005
Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m) Altura T (m)
L5-3 B1+3 A 4,643 30.3 26.0 24.0 22.0
L5-9 TA-3 A 2,794 26.4 22.5 20.5 20.5
L5-9A TA-3 A 2,794 26.4 22.5 20.5 20.5
METRADO ALTURA Y PESOS TORRES 60kV
PROYECTO: 22.9 kV AND 60 kV OVERHEAD POWER DISTRIBUTION
CONTRATO: K-EPCN-154C

LINEA L1: SE PAPUJUNE - SE INTERMEDIA


Estructura Tipo Anclaje/Suspension Peso (Kg) Altura (m) Altura R (m) Altura S (m)
LT1-1 T1+6 A 6,219 33.8 29.0 27.0
LT1-2 A1-3 A 3,256 24.3 20.0 18.0
LT1-3 T1-3 A 4,242 24.8 20.0 18.0
LT1-4 S1+6 S 3,215 30.5 28.1 26.5
LT1-5 S1+3 S 2,831 27.5 25.1 23.5
LT1-6 T1+0 A 4,892 27.8 23.0 21.0
LT1-7 B1-6 A 3,028 21.3 17.0 15.0
LT1-8 S1+3 S 2,831 27.5 25.1 23.5
LT1-9 S1+0 S 2,422 24.5 22.1 20.5
LT1-10 S1+6 S 3,215 30.5 28.1 26.5
LT1-11 B1+6 A 5,244 33.3 29.0 27.0
LT1-12 A1-3 A 3,256 24.3 20.0 18.0
LT1-13 B1+0 A 4,115 27.3 23.0 21.0
LT1-14 A1+0 A 3,704 27.3 23.0 21.0
LT1-15 T1+3 A 5,519 30.8 26.0 24.0
LT1-16 S1+0 S 2,422 24.5 22.1 20.5
LT1-17 S1-3 S 2,146 21.5 19.1 17.5
LT1-18 S1-3 S 2,146 21.5 19.1 17.5
LT1-19 B1+0 A 4,115 27.3 23.0 21.0
LT1-20 T1-6 A 3,505 21.8 17.0 15.0
LINEA L3: SE INTERMEDIA - DERIVACION SECTOR CICLONES
Estructura Tipo Peso (Kg) Altura (m) Altura R (m) Altura S (m)
LT3-1 T1-6 A 3,505 21.8 17.0 15.0
LT3-2 T1-3 A 4,242 24.8 20.0 18.0
LT3-3 T1+0 A 4,892 27.8 23.0 21.0
LT3-4 T1+3 A 5,519 30.8 26.0 24.0
LT3-5 T1-6 A 3,505 21.8 17.0 15.0
LT3-6 A1-3 A 3,256 24.3 20.0 18.0
LT3-7 S1-3 S 2,146 21.5 19.1 17.5
LT3-8 T1-6 A 3,505 21.8 17.0 15.0
LT3-9 T2+3 A 5,829 35.2 29.9 26.9
LT3-10 B1-6 A 3,028 21.3 17.0 15.0
LINEA L4: DERIVACION SECTOR CICLONES - SE BOMBEO DE DRENES
Estructura Tipo Peso (Kg) Altura (m) Altura R (m) Altura S (m)
LT4-1 A1-6 A 2,668 21.3 17.0 15.0
LT4-2 B1-3 A 3,622 24.3 20.0 18.0
LT4-3 B1+3 A 4,643 30.3 26.0 24.0
LT4-4 S1+9 S 3,627 33.5 31.1 29.5
LT4-5 T1+3 A 5,519 30.8 26.0 24.0
LT4-6 T1-6 A 3,505 21.8 17.0 15.0
LINEA L2: SE INTERMEDIA - SE TORRES DE CAPTACION
Estructura Tipo Peso (Kg) Altura (m) Altura R (m) Altura S (m)
LT2-1 T2+3 A 5,829 35.2 29.9 26.9
LT2-2 T2+3 A 5,829 35.2 29.9 26.9
LT2-3 A2+0 A 4,794 32.2 26.5 23.5
LT2-4 A2+3 A 5,398 35.2 29.5 26.5
LT2-5 T2+3 A 5,829 35.2 29.9 26.9
LT2-6 A2-3 A 4,262 29.2 23.5 20.5
LT2-7 T2+0 A 5,326 32.2 26.9 23.9
Altura T (m)
25.0
16.0
16.0
24.9
21.9
19.0
13.0
21.9
18.9
24.9
25.0
16.0
19.0
19.0
22.0
18.9
15.9
15.9
19.0
13.0

Altura T (m)
13.0
16.0
19.0
22.0
13.0
16.0
15.9
13.0
23.9
13.0

Altura T (m)
13.0
16.0
22.0
27.9
22.0
13.0

Altura T (m)
23.9
23.9
20.5
23.5
23.9
17.5
20.9
METRADOS MATERIALES MENORES
PROYECTO: 22.9 kV AND 60 kV OVERHEAD POWER DISTRIBUTION
CONTRATO: K-EPCN-154C

LISTA MATERIALES MENORES 22.9kV y 60kV


CANTIDAD CANTIDAD
Cantidad REQUERIDA REQUERIDA CANTIDAD CANTIDAD
ITEM DESCRIPCION UND. Codigo Saldo Status
PO-01 PROYECTO PROYECTO TOTAL TOTAL 3%
22.9kV 60kV
1 CONECTOR DE BRONCE (CABLE-PLATINA) 2 VIAS 2 TAPAS 21-70mm2 Und. 1371 MAT040513 3,377 86 3,463 3,568 -2197 Falta
2 GRAPA GUIA DE DOS CABLES OPGW EN TORRE Und. 67 MAT041941 216 108 324 334 -267 Falta
3 CONECTOR BIMETALICO DE DOBLE VIA Und. 284 - 281 85 366 377 -93 Falta
4 GRAPA DE BAJADA P/OPGW 192 HILOS PARA POSTE Und. 108 MAT041920 240 0 240 248 -140 Falta
5 GRAPA DE BAJADA P/OPGW 96 HILOS PARA POSTE Und. 198 MAT041927 384 0 384 396 -198 Falta
6 GRAPA DE BAJADA P/OPGW 48 HILOS PARA POSTE Und. 72 MAT041934 252 0 252 260 -188 Falta
7 BRAZO SOPORTE ANGULAR - LADO IZQUIERDO Und. 300 MAT040469 166 0 166 171 129 Ok
8 BRAZO SOPORTE ANGULAR - LADO DERECHO Und. 64 MAT040469 156 0 156 161 -97 Falta
Item Tramo Actividad Tendido Actividad Flechado Total dias
1 LT1-11@LT1-20 4 9 13 dias
2 LT1-7@LT1-11 4 3 7 dias
3 LT3-1@LT3-10 4 9 13 dias
4 LT1-1@LT1-7 4 7 11 dias
5 LT4-1@LT4-7 4 9 13 dias
57 dias
6 L8-18 1 1 dias
58 dias
Cantidad de Grapas
18
6
36
12
12
84
24
108
Tipo de
Cantidad
Armado
2 HTT
1 HTB
1 HRT
9 PA1-D
2 PA1C
2 PRC
2 PA3C
3 PSC
12 PA1SEC
PA1SECD
1 PA3+1
0 PA3SEC
1 PA4
2 PA1-3
1 PA1-5
1 PA1-5D
1 PD
1 PR-D
6 PREC
1 PTS
2 PTB
1 PTBS
1 PRECB
2 PRECT
1 SAB1
1 SAB2
0 SAB3
1 SAB4
1 SAB5
1 SAB6
1 SAB7
1 SAB8
1 SAB9
1 SAB10
1 SAB12
1 SAB51
6 SABC
Documento

ARMADO DE ESTRUCTURA TERMINAL-TIPO HTT(SIMPLE TERNA)- BAJADA SUBTERRANEO


ARMADO DE ESTRUCTURA TERMINAL-TIPO HTB (SIMPLE TERNA)- BAJADA SUBTERRANEO
ARMADO DE ESTRUCTURA TIPO HRT (SIMPLE TERNA)
DERIVACIÓN DE LÍNEA 1140-LA-004- L12-3
ARMADO DE ESTRUCTURA ANGULAR-TIPO PA1C
ARMADO DE ESTRUCTURA DE SUSPENSIÓN -TIPO PRC
ARMADO DE ESTRUCTURA ANGULAR- TIPO PA3C
ARMADO DE ESTRUCTURA DE SUSPENSIÓN -TIPO PSC
ARMADO CON SECCIONADOR BAJO CARGA TIPO PA1SEC
ARMADO DE ESTRUCTURA TIPO PA1SECD (SIMPLE TERNA)
ARMADO DE ESTRUCTURA ANGULAR-TIPO PA3+1 (SIMPLE TERNA)
ARMADO DE ESTRUCTURA TIPO PA3SEC (SIMPLE TERNA)
ARMADO DE ESTRUCTURA ANGULAR Y DERIVACIÓN -TIPO PA4(SIMPLE TERNA)
ARMADO DE ESTRUCTURA DE ANCLAJE ANGULAR TIPO PA1-3
ARMADO DE ESTRUCTURA ANGULAR-TIPO PA1-5
DERIVACIÓN DE LÍNEA 1140-LA-004 - LC6-2
ARMADO DE ESTRUCTURA DE ANCLAJE TIPO PD (SIMPLE TERNA)
DERIVACIÓN TIPO 5210-LA-021 / L2-8 /PR-D
ARMADO DE RECLOSER TIPO PREC
ARMADO DE ESTRUCTURA TERMINAL – TIPO PTS (SIMPLE TERNA)
ARMADO DE ESTRUCTURA TERMINAL-TIPO PTB (SIMPLE TERNA)- BAJADA SUBTERRANEO
ARMADO DE ESTRUCTURA TERMINAL-TIPO PTBS (SIMPLE TERNA) BAJADA SUBTERRANEO 5210-LA-011
ARMADO DE RECLOSER TIPO TERMINAL   BAJANTE / LINEA 5210-LA-121 /  PRECB
ARMADO DE RECLOSER TIPO TERMINAL  LINEA 5210-LA-001 /  PRECT
ARMADO DE ESTRUCTURA TERMINAL TIPO SAB1 L31-7
ARMADO DE S.E. POLVORÍN Y ALMACENAMIENTO NITRATO - SAB2 L14-6
ARMADO DE S.E. TABLERO DE FUERZA Y ALUMBRADO (PATIO DE VALVULAS) - SAB3 L20-2
ARMADO DE S.E. PATIO DESECHOS - SAB4 L12-8
ARMADO DE S.E. LÍNEA DE AGUA FRESCA - SAB5 L15-2
ARMADO DE S.E. TESTIGOTECA - SAB6 L18-3
ARMADO DE S.E. PLANTA OSMOSIS INVERSA MINA - SAB7 L17-2
ARMADO DE S.E. PLANTA TRATAMIENTO AGUAS SERVIDAS - SAB8 L32-1
ARMADO DE S.E. ESTACIÓN DE COMBUSTIBLE - SAB9 L55-1
ARMADO DE S.E. GARITA DE ACCESO - SAB10 L5-17
ARMADO DE ESTRUCTURA TIPO SAB12 L20-2 - POZA C4
ARMADO TRIPOSTE TIPO SAB51- ESTRUCTURA L51-1 - TRANSFORMADORES DE 500 kVA
ARMADO DE ESTRUCTURA ANGULAR-TIPO SAB
Codigo Plano de Referencia

MQ13-189-DR-5210-EE4024
MQ13-189-DR-5210-EE4356
MQ13-189-DR-5210-EE4364
MQ13-189-DR-1140-EE4341
MQ13-189-DR-1140-EE4019
MQ13-189-DR-1140-EE4016
MQ13-189-DR-1140-EE4020
MQ13-189-DR-1140-EE4014
MQ13-189-DR-2030-EE4301
MQ13-189-DR-2030-EE4341
MQ13-189-DR-5210-EE4367
MQ13-189-DR-6050-EE4340
MQ13-189-DR-5210-EE4366
MQ13-189-DR-6050-EE4319
MQ13-189-DR-1140-EE4010
MQ13-189-DR-1140-EE4340
MQ13-189-DR-5210-EE4023
MQ13-189-DR-5210-EE4026
MQ13-189-DR-2030-EE4302
MQ13-189-DR-5210-EE4361
MQ13-189-DR-5210-EE4025
MQ13-189-DR-5210-EE4362
MQ13-189-DR-5210-EE4355
MQ13-189-DR-5210-EE4354
MQ13-189-DR-2030-EE4303
MQ13-189-DR-5210-EE4135
MQ13-189-DR-5210-EE4140
MQ13-189-DR-5210-EE4141
MQ13-189-DR-5210-EE4142
MQ13-189-DR-5210-EE4143
MQ13-189-DR-5210-EE4144
MQ13-189-DR-5210-EE4146
MQ13-189-DR-5210-EE4147
MQ13-189-DR-5210-EE4148
MQ13-189-DR-1140-EE4013
MQ13-189-DR-5210-EE4467
MQ13-189-DR-1140-EE4011
ITEM DESCRIPCION UND.
1 CONECTOR BIMETALICO DE DOBLE VIA Und.
2 CLAVOS "U" DE ACERO CON RECUBRIMIENTO DE COBRE PARA Und.
SUJECION DE CABLE DE TIERRA
3 PERNO DE ꬾ 1/2" x 2 1/2" (GALVANIZADO EN CALIENTE), CON Und.
ARANDELA PLANA, ARANDELA DE PRESION Y TUERCA
4 ARANDELA PLANA DE NEOPRENO PARA PERNO ꬾ 1/2" Und.
LISTON DE MADERA TRATADA DE 50 X 19 mm SECCION 2700 mm
5 Und.
LONG; Y CLAVOS DE FIJACION
6 TERMOMETRO DE LIQUIDO EN VIDRIO MARCA TESMEC Und.

ITEM DESCRIPCION UND.

AISLADOR POLIMERICO DE SUSPENSION FXBW-23/120 CLEVIS -


1 Und.
TONGUE
2 GRILLETE RECTO - F1202-15 Und.
3 GRILLETE TIPO LIRA - F1202 Und.
AISLADOR POLIMERICO LINE POST 46KV MODELO PIN A6 LF
4 Und.
1130MARCA ISOELECTRIC - ESPIGA DE 14"
5 TAPA METALICA ESTRIADA Und.
6 CONECTOR PERNO PARTIDO, PARA CABLE DE COBRE 4/0 AWG. Und.
GRAPAS PARA INSTALACION DE CABLE DE COBRE 4/0 AWG EN
7 CONCRETO REF. BURNDY TIPO GC 2929 INCLUYE PERNO DE Und.
ANCLAJE DE 1/2" Ø X 2" CON ROSCA INTERIOR, ACERO
GALVANIZADO REF. HILTI HDI 1/2"
TERMINAL A COMPRESION DE 01 AGUJERO DE ∅12MM PARA CABLE
8 Und.
DE COBRE 4/0 AWG REF. BURNDY YA28
9 BARRA DE COBRE DE 50MM DE ANCHO X 1/4" DE ESPESOR, MINIMO Und.
15 HUECOS Ø14MM
10 CONECTOR VARILLA - CABLE COBRE 4/0. REF BURNDY GAR 6429 Und.
TERMINAL A COMPRESION DE 01 AGUJERO DE ∅12MM PARA CABLE
11 Und.
DE COBRE 2/0 AWG. REF BURNDY YA26N
12 TUERCA CON RESORTE DE 1/2"Ø, PARA RIEL UNISTRUT DE ACERO Und.
GALVANIZADO. REF UNISTRUT P1010
PERNO CABEZA REDONDA MAQUINADO DE 1/2"ØX1 1/2", DE ACERO
13 Und.
GALVANIZADO. REF COPELADDER 6112-2
ANCLAJE DE 1/2" ØX 2" CON ROSCA INTERIOR, ACERO
14 Und.
GALVANIZADO. REF HILTI HDI 1/2"
Cantidad
Codigo
Requerida
6 -
2000 MAT041838

40 -
40 -
20 MAT041824
2 -

Cantidad
Requerida Codigo

6 SUM020510
12 MAT041944
6 MAT041943
6 MAT042220
1 -
5 -

40 -

15 -

2 -
3 -
40 -

4 -

8 -

8 -

Vous aimerez peut-être aussi