PVSYST V6.

88 31/03/24 Page 1/1

Pré-dimensionnement système de pompage


Site géographique Guelmim Pays Maroc
Situation Latitude 28.99° N Longitude -10.06° W
Temps défini comme Temps légal Fus. horaire TU Altitude 318 m
Orientation plan capteurs Inclinaison 30° Azimut 0°

System pre-sizing evaluation

Required autonomy
Loss-of-Load
Pumping head
PVsyst EVALUATION
Average use of water Daily

Time fraction
Average
105.0 m³/jour
5 days
5.0 %
80 mCE
Yearly
Tank volume
Missing Water
Maximum
38325 m³
525 m³
1916 m³
80 mCE
Pumping system configuration Regulation Convertisseur MPPT-DC Layout DeepWell
PV array PV Nominal power 10304 Wp Pump Power 8157 W
Economic gross evaluation Investment 4392 EUR Energy price 0.01 EUR/m³

PV energy yield and water needs Tank Level and Missing Water Probability

80 140 80
Available Solar energy 60.5 kWh/jour Av. tank filling state 16.4 %
70 Energy needs 63.7 kWh/jour 70 Missing water 5.0 %
120

PVsyst EVALUATION
Water needs 105.0 m3/day
60 60
100
[m3/day]
[kWh/jour]

50 50
80
Percent
needs

40 40
60
Energy

Water

30 30

40
20 20

10 20 10

0 0 0
Jan Fév Mar Avr Mai Jun Jui Aoû Sep Oct Nov Déc Année Jan Fév Mar Avr Mai Jun Jui Aoû Sep Oct Nov Déc Année

Incid. PV avail. PV needs PV Excess Pumped W. Missing W. Missing Fuel

PVsyst EVALUATION
Jan.

Fév.
kWh/m².jr

6.3

6.3
kWh/jour

58.0

58.0
kWh/jour

63.7

63.7
kWh/jour

0.0

0.0
m³/jour

95.7

95.6
m³/jour

9.8

9.0
%

9.3

8.6
liter

122.4

101.9

Mars 7.0 64.6 63.7 0.0 106.5 4.7 4.4 58.4

Avr. 7.1 66.0 63.7 0.0 108.9 0.0 0.0 0.0

Mai 6.9 64.4 63.7 0.0 106.3 0.0 0.0 0.0

Juin 6.3 58.2 63.7 0.0 96.0 0.0 0.0 0.0

Jui. 6.5 59.9 63.7 0.0 98.7 3.9 3.7 48.4

Août 6.4 59.6 63.7 0.0 98.3 6.4 6.1 80.4

Sep. 6.5 60.0 63.7 0.0 99.0 6.0 5.8 73.3

Oct. 6.5 60.6 63.7 0.0 99.9 5.1 4.8 63.3

PVsyst EVALUATION
Nov. 6.4 59.2 63.7 0.0 97.6 7.4 7.0 89.4

Déc. 6.1 57.0 63.7 0.0 94.1 10.9 10.4 137.1

Année 6.5 60.5 63.7 0.0 99.7 5.3 5.0 774.6