Vous êtes sur la page 1sur 6

Designation Charges Permanentes G Charges d'Exploitations Q

Niv

PS
des Ouvrages L l e / h Poids prop Total daN Cumul daN L l Poids prop Coef Total daN Cumul daN

N
1 Toiture
couverture 1 2.9 1.5 6 26.1 26.1 2.9 1.5 100 0.88 382.8 382.8
Panne 3 2.9 1 1 12.9 112.23 138.33 0 382.8
Pignon 1 0.18 1 1 240 43.2 181.53 0 382.8
2 Poutre Long 1 2.9 0.2 0.2 2500 290 471.53 0 382.8
Poutre Trans 1 1.5 0.2 0.2 2500 150 621.53 0 382.8
3 Poteau 1 0.2 0.2 2.1 2500 210 831.53 0 382.8
4 Mur Long 1 2.9 1 2.1 800 4872 5703.53 0 382.8
Mur Trans 1 1.5 1 2.1 800 2520 8223.53 0 382.8
5 Plancher 1 2.9 1.5 1 239 1039.65 9263.18 2.9 1.5 150 0.88 574.2 957
6 Poteau 1 0.2 0.2 4 2500 400 9663.18 0 957
chainage bas 1 1.5 0.2 0.1 2500 75 9738.18 0 957
5 Fut 1 0.2 0.2 1.5 2500 150 9888.18 0 957
6 Semelle 1 1.5 1.5 0.2 2500 1125 11013.18 1.3 1.3 150 0.2 50.7 1007.7
12020.88

Semelle 50x50

Niveaux Nu Nser
Poteau 1696.77 1214.33
Poteau 2 14481 6086.33
Fut 14785 10845
Semelle 16379 12021
Poteau C3
Designation Charges Permanentes G Charges d'Exploitations Q
Niv

PS
des Ouvrages L l e / h Poids prop Total daN Cumul daN L l Poids prop Coef Total daN Cumul daN

N
1 Toiture
couverture 1 7.5 4.7 6 211.5 211.5 7.5 4.7 100 0.88 3102 3102
Panne 5 7.5 1 1 12.9 483.75 695.25 0 3102
Ferme 1 4.7 1 1 16.5 77.55 772.8 0 3102
2 Poutre Long 1 7.2 0.15 0.25 2500 675 1447.8 0 3102
Poutre Trans 1 4.35 0.15 0.25 2500 407.8125 1855.6125 0 3102
3 Poteau 1 0.2 0.2 5.1 2500 510 2365.6125 0 3102
4 Murette 2365.6125 0 3102
Mur 1 4.2 0.4 0.5 800 672 3037.6125 0 3102
Béton Ordinair 1 4.2 0.1 0.5 2000 420 3457.6125 0 3102
5 Fut 1 0.2 0.2 1.5 2500 150 3607.6125 0 3102
6 Semelle 1 0.65 0.65 0.2 2500 211.25 3818.8625 1 1 150 0.2 30 3132
6950.8625

Semelle 50x50

Niveaux Nu Nser Nu[MN]


Poteau 7846.58 5467.61 0.07847
Fut 9523.28 6709.61 0.09523
Semelle 9853.46 6950.86 0.09853
Poteau C3
Designation Charges Permanentes G Charges d'Exploitations Q
Niv

PS
des Ouvrages L l e / h Poids prop Total daN Cumul daN L l Poids prop Coef Total daN Cumul daN

N
1 Toiture
couverture 1 7.2 4.65 6 200.88 200.88 7.5 1.7 100 1.1 1402.5 1402.5
Panne 4 7.2 1 1 6 172.8 373.68 0 1402.5
Ferme 1 4.65 1 1 7 32.55 406.23 0 1402.5
2 Poutre Long 1 7.2 0.2 0.3 2500 1080 1486.23 0 1402.5
Poutre Trans 1 4.3 0.2 0.3 2500 645 2131.23 0 1402.5
3533.73
Designation Charges Permanentes G Charges d'Exploitations Q
Niv

PS
des Ouvrages L l e / h Poids prop Total daN Cumul daN L l Poids prop Coef Total daN Cumul daN

N
1 Toiture
couverture 1 7.2 4.65 6 200.88 200.88 7.5 1.7 100 0.9 1147.5 1147.5
Panne 1 7.2 1 1 6 43.2 244.08 0 1147.5
Ferme 1 4.65 1 1 7 32.55 276.63 0 1147.5
2 Poutre Trans 1 4.3 0.2 0.3 2500 645 921.63 0 1147.5
2069.13

Vous aimerez peut-être aussi