MISSION A MISSION B MISSION C MISSION D MISSION E

soumissionnaires

PHASE1: TRAVAUX PREPARATOIRES SOUS- SOUS-


TOTAL TVA (13%
SOUS- PHASE2: ETUDES SOUS- TOTAL TOTAL TOTAL TOTAL TOTAL HTVA TVA (19% TP) TOTAL TTC TOTAL TTC des
sites

TOTAL MISSION TOTAL ETUDES/APS/D


CAMPAGNE GEOTECHNIQUE TOTAL TOTAL MISSION B MISSION C PHASE1: PHASE2: (DT) (DT) (DT) deux sites (DT)
LEVE TOPOGRAPHIQUE MISSION A D MISSION E AO) (DT)
PHASE 1 PHASE 2 APD DAO
FOUILLES SONDAGES PRESSIO IDENTI. PHY. MEC SONDAGES CARRO PIEZOMETRE ANALYSE PHY CHI CAMPAGNE TRI DES EEP EHH (DT) (DT)
(DT) (DT)
QT PU TOTAL QT PU TOTAL QT PU TOTAL QT TOTAL QT TOTAL QT PU TOTAL QT TOTAL QT DECHETSTOTAL FORFAIT FORFAIT FORFAIT FORFAIT FORFAIT FORFAIT FORFAIT
PU (DT) PU (DT) PU (DT) PU (DT)
(ha (DT) HTVA (U) (DT) HTVA (ml) (DT) HTVA (DT) (F) HTVA (ml) HTVA (DT) (ml) (DT) HTVA (DT) (F) HTVA (F) HTVA (DT) (DT) (DT) (DT) (DT) (DT) (DT)
ADMINISTR

MAHDIA 30 250 7 500 5 300 1 500 150 100 15 000 5 800 4 000 80 150,0 12 000 160 100 16 000 4 750 3 000 2 7 500 15 000 74 000 15 000 15 000 30 000 104 000 60 000 40 000,0 26 000 40 000 30 000 70 000 300 000,0 14 060,000 29 380,000 343 440,000
ATION

686 880,000
SILIANA/KEF 30 250 7 500 5 300 1 500 150 100 15 000 5 800 4 000 80 150,0 12 000 160 100 16 000 4 750 3 000 2 7 500 15 000 74 000 15 000 15 000 30 000 104 000 60 000 40 000,0 26 000 40 000 30 000 70 000 300 000,0 14 060,000 29 380,000 343 440,000

MAHDIA 30 600 18 000 5 480 2 400 150 72 10 800 5 600 3 000 80 84,0 6 720 160 180 28 800 4 360 1 440 2 600 1 200 72 360 5 450 17 150 22 600 94 960 37 200 27 050,0 21 800 18 500 17 100 35 600 216 610,0 13 748,400 18 752,500 249 110,900
I2E

593 365,300
SILIANA/KEF 30 600 18 000 5 480 2 400 150 78 11 700 5 600 3 000 80 84,0 6 720 160 180 28 800 4 360 1 440 2 600 1 200 73 260 9 350 25 750 35 100 108 360 69 000 38 800,0 31 800 29 600 23 200 52 800 300 760,0 13 919,400 29 575,000 344 254,400

MAHDIA 30 88 2 640 5 275 1 375 150 66 9 900 5 388 1 940 80 66,0 5 280 160 55 8 800 4 275 1 100 2 5 300 10 600 41 635 30 606 30 381 60 987 102 622 34 507 37 871,5 25 043 37 936 36 363 74 299 274 342,5 7 910,650 30 251,975 312 505,125
ICP

623 440,680
SILIANA/KEF 30 88 2 640 5 275 1 375 150 66 9 900 5 388 1 940 80 66,0 5 280 160 55 8 800 4 275 1 100 2 5 300 10 600 41 635 30 606 30 381 60 987 102 622 34 507 36 132,5 25 043 38 111 36 538 74 649 272 953,5 7 910,650 30 071,405 310 935,555

MAHDIA 30 200 6 000 5 300 1 500 150 75 11 250 5 350 1 750 80 70,0 5 600 160 70 11 200 4 300 1 200 2 4 000 8 000 46 500 4 000 18 000 22 000 68 500 15 000 35 000,0 8 000 40 000 15 000 55 000 181 500,0 8 835,000 17 550,000 207 885,000
SAFI

419 160,000
SILIANA/KEF 30 200 6 000 5 300 1 500 150 75 11 250 5 350 1 750 80 70,0 5 600 160 70 11 200 4 300 1 200 2 4 000 8 000 46 500 4 000 15 000 19 000 65 500 13 000 35 000,0 8 000 45 000 18 000 63 000 184 500,0 8 835,000 17 940,000 211 275,000

MAHDIA 30 90 2 700 5 770 3 850 150 180 27 000 5 770 3 850 80 200,0 16 000 160 240 38 400 4 800 3 200 2 9 000 18 000 113 000 54 000 39 000 93 000 206 000 58 000 79 250,0 45 000 78 250 29 250 107 500 495 750,0 21 470,000 49 757,500 566 977,500
SCET

1 133 955,000
SILIANA/KEF 30 90 2 700 5 770 3 850 150 180 27 000 5 770 3 850 80 200,0 16 000 160 240 38 400 4 800 3 200 2 9 000 18 000 113 000 54 000 39 000 93 000 206 000 58 000 79 250,0 45 000 78 250 29 250 107 500 495 750,0 21 470,000 49 757,500 566 977,500

MAHDIA 30 300 9 000 5 500 2 500 150 75 11 250 5 75 375 80 162,5 13 000 160 110 17 600 4 1 500 6 000 2 10 000 20 000 79 725 3 720 8 670 12 390 92 115 62 910 42 230,0 40 350 39 750 29 000 68 750 306 355,0 10 364,250 29 461,900 346 181,150
SERAH

692 362,300
SILIANA/KEF 30 300 9 000 5 500 2 500 150 75 11 250 5 75 375 80 162,5 13 000 160 110 17 600 4 1 500 6 000 2 10 000 20 000 79 725 3 720 8 670 12 390 92 115 62 910 42 230,0 40 350 39 750 29 000 68 750 306 355,0 10 364,250 29 461,900 346 181,150

MAHDIA 30 330 9 900 5 200 1 000 150 110 16 500 5 550 2 750 80 100,0 8 000 160 100 16 000 4 2 000 8 000 2 3 500 7 000 69 150 15 000 15 000 30 000 99 150 40 000 40 000,0 12 000 40 000 20 000 60 000 251 150,0 13 138,500 23 660,000 287 948,500
TCS

575 897,000
SILIANA/KEF 30 330 9 900 5 200 1 000 150 110 16 500 5 550 2 750 80 100,0 8 000 160 100 16 000 4 2 000 8 000 2 3 500 7 000 69 150 15 000 15 000 30 000 99 150 40 000 40 000,0 12 000 40 000 20 000 60 000 251 150,0 13 138,500 23 660,000 287 948,500