Académique Documents
Professionnel Documents
Culture Documents
Technical
Publication
Direction 5117624-100
Revision 1
GE Medical Systems
LOGIQ™ Book Installation Instruction
OPERATING DOCUMENTATION
Important Precautions
i
GE MEDICAL SYSTEMS
DIRECTION 5117624-100, REVISION 1 LOGIQ™ BOOK INSTALLATION INSTRUCTION
ii -
GE MEDICAL SYSTEMS
DIRECTION 5117624-100, REVISION 1 LOGIQ™ BOOK INSTALLATION INSTRUCTION
iii
GE MEDICAL SYSTEMS
DIRECTION 5117624-100, REVISION 1 LOGIQ™ BOOK INSTALLATION INSTRUCTION
DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent write “Damage In
Shipment” on ALL copies of the freight or express bill BEFORE delivery is accepted or “signed for” by
a GE representative or hospital receiving agent. Whether noted or concealed, damage MUST be
reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the
contents and containers held for inspection by the carrier. A transportation company will not pay a claim
for damage if an inspection is not requested within this 14 day period.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers,
personnel of third-party service companies with equivalent training, or licensed electricians) to perform
electrical servicing on the equipment.
GE Medical Systems employees should use the iTrak System to report all documentation errors or
omissions.
iv -
GE MEDICAL SYSTEMS
DIRECTION 5117624-100, REVISION 1 LOGIQ™ BOOK INSTALLATION INSTRUCTION
Revision History
v
GE MEDICAL SYSTEMS
DIRECTION 5117624-100, REVISION 1 LOGIQ™ BOOK INSTALLATION INSTRUCTION
vi -
GE MEDICAL SYSTEMS
DIRECTION 5117624-100, REVISION 1 LOGIQ™ BOOK INSTALLATION INSTRUCTION
Chapter 1
INSTALLATION
Section 1-1
Overview
1-1-1 Purpose of Chapter 1
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
The LOGIQ™ Book installation and functional checkout will take approximately one hour.
2.) After being transported, the unit may be very cold or hot. If this is the case, allow the unit to
acclimate before you turn it on. It requires one hour for each 2.5°C increment it's temperature is
below 10°C or above 40°C.
DANGER Equipment damage possibility. Turning the system on without acclimation after arriving at site
may cause the system to be damaged.
hrs 8 6 4 2 0 0 0 0 0 0 0 2 4 6 8 10 12 14 16 18 20
DANGER To prevent electrical shock, connect the unit to a properly grounded power outlet. Do not use a
three to two prong adapter. This defeats safety grounding.
DANGER Do not operate this unit unless all board covers are securely in place.
Section 1-2
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
Adhesive tape
Plastic Bands
Paper pad
rrubber band
A
Accessories Package
interleaver
CAUTION Do not lift the unit by the rubber band. Equipment damage may result.
Interleaver
Plastic bag
Interleaver
Console
50ºC
Air Pressure
4 700-1060hpa
-5ºC
Humidity 10-90%
Excluding Condensation.
CAUTION Please carefully unpack the system, and do not dispose the package of LOGIQ™ Book, so that
it can be reused for service.
CAUTION Equipment Damage Possibility. Lifting the console by holding covers may damage the covers.
Do not lift the console by holding any covers.
In general, a single adult can move the LOGIQ™ Book. Before moving, store all loose parts in original
accessory box or in back pack. Return probes to original box.
Section 1-3
Packing the Equipment
Please pack LOGIQ™ Book in the reverse order of unpacking.
Section 1-4
Preparing for Installation
1-4-1 Verify Customer Order
Compare items received by the customer to that which is listed on the delivery order. Report any items
that are missing, back ordered or damaged.
WARNING Connecting a LOGIQ™ Book scanner to the wrong voltage level will most likely destroy
the scanner.
Section 1-5
Completing the Installation
1-5-1 Power On / Boot Up
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
CAUTION The system should rest on the handle to allow an air gap to prevent overheating.
When the Power On/Off switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
1.) Press the Power On/Off switch at the front of the system once.
2.) The System-Exit window is displayed.
NOTE: Please ensure that the probe latch is in an unlocked position before you connect the probe to the
systsem.
probe latch
Section 1-6
Functional Checkout
Refer to the customers “Quick Guide” to perform a functional checkout.
R2.0.3 2393335-3