Table de Matières
1. INTRODUCTION .............................................................................................. 1
1.1 CONTEXTE GENERAL ....................................................................................................... 1
1.2 CADRE DE L'ETUDE .......................................................................................................... 1
1.3 OBJECTIFS DE L’ETUDE .................................................................................................... 1
1.4 CONSISTANCE DE L’ETUDE .............................................................................................. 1
1.5 DOCUMENTS DE BASE ..................................................................................................... 2
1.6 CONTENU DU DOSSIER.................................................................................................... 2
1.6.1 Rapport ................................................................................................................................. 2
1.6.2 Annexes ................................................................................................................................. 2
2. PRÉSENTATION DE LA ZONE DU PROJET ................................................................ 3
2.1 LOCALISATION ............................................................................................................... 3
2.2 CADRE CLIMATOLOGIQUE .............................................................................................. 3
2.2.1 Pluviométrie ........................................................................................................................... 3
2.2.2 Température .......................................................................................................................... 6
2.2.3 Vent ...................................................................................................................................... 7
2.2.4 Évaporation............................................................................................................................ 7
2.3 CADRE HYDROGEOLOGIQUE .......................................................................................... 8
2.3.1 Nappe phréatique de Djerba .................................................................................................. 8
2.3.2 Nappe profonde de la Djeffara .............................................................................................. 8
2.4 CADRE PEDOLOGIQUE .................................................................................................... 9
2.5 VEGETATION NATURELLE ................................................................................................ 9
2.5.1 Le complexe écologique Zarziso-Jerbien : ................................................................................. 9
2.5.2 Le groupement à Peganumharmala et Aizooncanariense........................................................... 10
2.5.3 Les groupements littoraux ...................................................................................................... 10
2.5.4 Les groupements fortement halophites. .................................................................................... 10
2.6 UNITES PAYSAGERES .................................................................................................... 10
2.6.1 Unité de végétation halophile, phréatophile et littorale ............................................................ 11
2.6.2 Unité d’oliveraie clairsemée ................................................................................................... 11
2.6.3 Unité d’arboriculture fruitière ................................................................................................. 11
2.6.4 Unité de culture « Menzel » ................................................................................................... 11
2.6.5 Unité des agglomérations et infrastructure hôtelière ................................................................. 12
2.7 DYNAMIQUE DEMOGRAPHIQUE.................................................................................... 12
2.8 INFRASTRUCTURES DE BASE .......................................................................................... 12
2.8.1 Eau potable ......................................................................................................................... 12
2.8.2 Electrification ........................................................................................................................ 13
2.8.3 Assainissement et eaux usées ................................................................................................. 13
2.8.4 Réseau routier ...................................................................................................................... 13
3. DIAGNOSTIC DE LA SITUATION ACTUELLE ............................................................ 15
3.1 RESEAU HYDROGRAPHIQUE ......................................................................................... 15
1. INTRODUCTION
1.1 CONTEXTE GENERAL
Les inondations urbaines, qui se produisent de plus en plus fréquemment, représentent une
menace pour le développement et la vie des populations. Ce type d’inondation se produit
quand la quantité d’eaux de ruissellement issues d’une tempête dépasse la capacité des
infrastructures existantes. Une gestion efficace des risques d’inondation est essentielle pour
protéger les populations et leurs moyens de subsistance contre ces phénomènes et limiter les
pertes futures. Cependant, les mesures techniques de protection n’offrent aux surfaces
urbanisées qu’une protection « apparente ». Elles protègent les populations et leurs biens
uniquement jusqu’à un niveau maximal prévu, qui peut néanmoins toujours être dépassé par
une crue extrême. Si ce niveau maximal, que l’on appelle niveau de crue de référence, est
dépassé, les dommages subis en aval sont souvent extrêmement élevés. C’est pourquoi le
plan d’action contre les inondations préconise de ne pas faire croître en aucun cas les
dommages potentiels dans les zones exposées au risque d’inondation.
La base de toute stratégie ou opération de lutte contre les inondations dans ses différentes
composantes (prévisions, réglementation, gestion et organisation) est une meilleure
connaissance du risque des inondations et une meilleure maîtrise des mesures techniques
de protection. La présente étude de protection de la ville de Houmet Souk contre les
inondations s’inscrit dans le cadre de la préservation de la population et de la sauvegarde de
la nature, des infrastructures collectives publiques et privées, pour assurer leur
développement et leur pérennité et en faire un facteur de développement durable.
La présente étude a pour objectif de caractériser le risque des inondations dans la ville de
Houmet Souk pour différentes occurrences et de concevoir un plan d'aménagement pour la
protéger contre ce phénomène.
Il s’agit d’élaborer une étude de protection contre les inondations de la ville de Houmet Souk.
Cette étude est subdivisée en trois (03) phases :
1.6.1 RAPPORT
Les différentes annexes, qui ont été mentionnées dans le rapport, sont présentées dans
l'ordre suivant :
Annexe-1 : Cartes de délimitation des sous-bassins versants,
Annexe-2 : Cartes de variation des altitudes des sous-bassins versants,
Annexe-3 : Cartes des pentes des sous-bassins versants,
Annexe-4 : Courbes IDF-Station de Matmata ancienne,
Annexe-5 : Hyétogramme des pluies par la méthode de Kiefer,
Annexe-6 : Résultats de la simulation hydrologique par le modèle de SWMM,
Annexe-7 : Résultats de la simulation hydraulique par le logiciel Hec-Ras.
2.2.1 PLUVIOMETRIE
Les analyses pluviométriques ont été réalisées à partir des données disponibles au niveau de
la station pluviométrique de Houmet Souk (1960-2022). La zone d’étude est caractérisée par
3752500,000000
ETUDE DE PROTECTION CONTRE LES INONDATIONS
DE LA VILLE DE HOUMET SOUK
Carte de localisation Echelle : 1/40 000
M
RL9 E
41 R
M
É
D
3751000,000000
3751000,000000
I T
E R
RL1030
R A
N É
E
Boumlel
3749500,000000
RR 30
11 10 Sidi Zayed
7 RL Fatou
Ezzaouia
16E
RR1
Jouamaa Souani
Vers Melita
3748000,000000
3748000,000000
RL1
031
Houmet Souk
6
11
RR
RR117
Légende :
im
Aj
rs
RR
Ve
3746500,000000
3746500,000000
Limite du PAU
117
Vers Zarzis
Route Locale
Route Régionale
11
8 Zarzis
RR
0 0,75 1,5
RN1
Km
Médenie
667100,000000 669000,000000 670900,000000 672800,000000 674700,000000 676600,000000
DIRECTION DE L’HYDRAULIQUE URBAINE REF N°07/2022
une irrégularité aussi bien saisonnière qu’inter-annuelle et par des précipitations présentant
souvent un caractère orageux.
800
700
600
500
P(mm)
400
300
200
100
0
1960
1963
1966
1969
1972
1975
1978
1981
1984
1987
1990
1993
1996
1999
2002
2005
2008
2011
2014
2017
2020
Figure 2: Variabilité des pluviométries annuelle
Source : INM, Station de Houmet Souk (1960-2022)
Les précipitations moyennes annuelles sont de l’ordre de 212.2 mm. La pluviométrie annuelle
maximale a été de 710.2 mm enregistré à l’année 1996, tandis que la pluviométrie annuelle
minimale a été de 50.4 mm en 2021. En outre, comme on peut le constater d’après la figure
ci-dessus, les précipitations se caractérisent par une grande variabilité interannuelle avec
parfois des variations exceptionnelles d’une année à l’autre
Il convient également de signaler que la commune de Houmet Souk a enregistré ces dernières
années comme le reste de l’île et du gouvernorat des précipitations plus faibles que la
moyenne habituelle (le cumul des précipitations en 2021 est de 50,4 mm et 99,6 mm en 2022)
entrainant ainsi une sécheresse qui peut s’expliquer par l’impact du changement climatique.
50.00
40.00
30.00
P(mm)
20.00
10.00
0.00
Jan fév Mar Avr Mai Jui Juil Ao u Sep Oct Nov Déc
Mois
La pluviométrie mensuelle, dans la commune de Houmet Souk, est caractérisée par une forte
variabilité spatiale et temporelle avec un caractère orageux et torrentiel. Le mois d’Octobre
représente le mois le plus pluvieux de 47.6 mm, alors que le mois de Juillet est parmi les mois
les plus déficitaires en précipitation de 0,1 mm.
2.2.2 TEMPERATURE
35
30
25
20
T(°C)
15
10
0
Jan Fév Mars Avr Mai Jui Juil Août Sept Oct Nov Déc
2.2.3 VENT
Le territoire de Houmet Souk comme celui de toute l’île, est soumis à des vents de différentes
directions, résultant de la circulation des masses d’air entre les divers centres d’action
(anticyclones et cyclones) ou des perturbations nées du contact entre les masses d’air bien
contrastées (air polaire froid et air tropical chaud). Ces vents, peuvent être classés suivant
leur rôle morphogénique (érosion éolienne) en vents inactifs et vents actifs. Les vents inactifs
sont subdivisés en : vents calmes ou faibles (v<1m/s) et vents moyens (1m/s <v<3m/s). Les
vents actifs se divisent en vents forts (3m/s< v < 6m/s) et vents très forts (v >6m/s). Ainsi, il
ressort que 70% des vents ont un potentiel érosif.
2.2.4 ÉVAPORATION
Généralement, il apparait que le taux d'évaporation est toujours plus élevé dans les régions
du Sud que dans les autres régions, au niveau de la zone de Houmet Souk, l’évaporation
totale annuelle est de l’ordre de 1481 mm/an. Un pic d’évaporation pendant le mois de Juillet
avec 164.1 mm ; alors que le minimum est enregistré pendant le mois de Janvier avec un total
de 84.8 mm.
Elle se présente sous forme d'un système aquifère multicouches de structure complexe
constitué du Mio-Pliocène continental et du Quaternaire. L'épaisseur totale de la formation
aquifère est aux alentours d'une cinquantaine de mètres. L'écoulement souterrain est diffus
sans direction préférentielle. Son alimentation s’effectue, selon la profondeur de la couche
aquifère, de trois manières :
Par l’infiltration directe des eaux pluviales lorsque la nappe est logée dans les sables
et les limons sableux en affleurement au niveau des régions centrales ou dans les
sables dunaires et des calcaires à Strombus le long des côtes,
Indirectement à partir des autres couches bénéficiant d’une bonne alimentation à
partir des eaux de pluies au niveau des contacts anormaux (cas des sables Miocène
en contact avec les calcaires du Tyrrhénien ou les sables du Quaternaire
continental),
À partir de la nappe profonde par drainance et par l’intermédiaire des failles. C’est
une alimentation assez complexe, mais secondaire.
La profondeur du plan d'eau varie entre 10 et 30 m sur une grande majorité. Elle atteint un
niveau inférieur à 10 m, voire 5 m, à proximité des côtes.
Malgré sa monotonie topographique, Houmet Souk présente une grande diversité de sols. En
effet, les sols ont une évolution dominée par les mouvements des éléments chimique du
calcium, puisque la majorité des affleurements se composent de roches sédimentaires
essentiellement calciques. Selon la carte pédologique, on distingue globalement cinq (05)
classes de sols dans le territoire de la commune.
Sols halomorphes très limitée et ne peuvent être utilisée que sous forme de
parcours essentiellement pour les camélidés.
Ces sols ont une vocation agricole très limitée et constituent
Sols hydromorphes
actuellement une partie de la zone touristique de l’île
Est réunie dans ce complexe une végétation très influencée par l’action de l’homme et des
animaux. Il s’agit surtout de l’association à Pituranthostortuosuset Haplophylumvermiculare.
C’est une association qui se développe dans les terres cultivées, le plus souvent les olivettes.
Ces groupements ne se développent que dans l’ambiance littorale. Quatre (04) associations
peuvent être distinguées :
L’association à Ammophilaarenaria, Agropyrum junceum et Nitrariaretusa. Elle
colonise les dunes littorales constituées de sable grossier. Son intérêt réside dans
la fixation des dunes.
L’association à Medicago marina et Ononis vaginalis. Ce groupement qui se
rencontre sur la côte Est, est lié aux sables maritimes avec présence d’une nappe
phréatique saumâtre proche de la surface.
L’association à Imperatacylindrica et Ononis natrix. Cette association est présente
sur la côte Nord et Nord-Est de l’île. Elle est liée à l’ambiance littorale et se rencontre
sur les sables littoraux grossiers, profonds surmontant une nappe phréatique peu
salée.
L’association à Nitrariaretusa, Suaeda mollis et Salsolasieberi. Ce groupement
colonise les dépressions alluviales à Mellita. La végétation s’étage en deux strates ;
une strate arbustive et une strate herbacée
Ces groupements colonisent les sols salés des bordures. Ils sont formés d’une steppe dense
à base de Salicornia arabica (sur les sols salins où la nappe est proche de la surface),
Arthrocnemumindicum (sur les sols fortement salés où la nappe est à 1 à 2 m de la surface),
Halocnemumstrobilaceum (sur les sols fortement salés présentant une pellicule de chlorure
en surface) et Halopeplisamplexicaulis (sur les sols les plus salés).
Cinq (05) unités d’occupation du sol différentes peuvent être mises en évidence au niveau de
la commune. Des chevauchements peuvent exister entre ces différentes unités, cependant
chacune de ces dernières se caractérise par une spéculation, un mode de production, une
utilisation du sol et une dynamique différente.
D'une superficie de 2027 ha, cette unité se caractérise par une forêt clairsemée d’oliviers
rabougris et peu productifs. Les plages vides entre les individus sont occupées par une
végétation en dégradation des groupes de sols squelettiques sur croûte calcaire ou calcaire
oolithique à base de Gymnocarposdecander et Hélianthemumkahiricum, et constituant un
parcours très médiocre. Délaissé ainsi, cette unité tend vers une dégradation tant au niveau
de la couverture du sol que de l’état des arbres.
Couvrant une superficie d’environ 10717 ha, avec un morcellement de la propriété assez
prononcée, cette unité se caractérise par la prédominance de l’arboriculture fruitière (figuier,
amandier, pommier…) et de l’olivier sous forme de « jnen ». La production agricole de ces
vergers (raisin, figues, amandes et huile) est destinée avant tout à l’autoconsommation
familiale. C’est une unité assez productive, bien mise en valeur et dont l’évolution reste
dépendante de la présence et de la qualité d’eau d’irrigation.
Appelé système « Menzel », cette unité paysagère de type « oasien » comporte, en plus de
l’habitat traditionnel « hoche », une exploitation agricole irriguée avec un puits de surface dont
le système de culture se compose généralement de trois étages à savoir :
Le palmier dattier en ligne, représentant l’étage de végétation supérieur,
L’oléiculture et l’arboriculture fruitière, comme étage secondaire,
Les cultures maraîchères, en tant qu’étage inférieur.
Le système Menzel constitue généralement le domaine familial où sont produits les besoins
en légumes et fruits. Le palmier dattier dont plusieurs cultivars sont présents (Lemsi, Rotbi,
Bou Hatem, Khalti, Hammouri, Mettata…) constitue avec l’olivier les deux principales
spéculations agricoles qui sont assez productif au niveau de cette unité. L’évolution et la
durabilité du système Menzel sont liées à la présence des puits, à la qualité de l’eau d’irrigation
et à la présence des propriétaires.
L’aspect attractif et touristique de l’île de Djerba a engendré une extension des agglomérations
et de l’infrastructure hôtelière au détriment des terres agricoles. De ce fait, le paysage urbain
et touristique tend à occuper plus d’espace.
Considérée comme la « capitale » de l’île, Houmet Souk est la plus peuplée des trois
communes de l’île, avec 75 904 habitants en 2014, soit 46% de la population insulaire. En 6
ans, Houmet Souk a enregistrée une population additionnelle de 7 566 habitants, soit environ
9% de la population actuelle. En effet, le taux d’accroissement de la population entre 2014-
2020 est largement inférieur au taux d’accroissement au niveau de l’île, mais il reste largement
supérieur au taux d’accroissement au niveau du gouvernorat.
La Commune de Houmet Souk, comme toute l’île est alimentée en eau potable par :
La station de dessalement des eaux saumâtres de Guallala (capacité 15 000m3/j),
La station de dessalement d’eau de mer qui a débuté son activité en mai 2018
(capacité 50 000m3/j),
Huit (08) forages.
La longueur totale du réseau d’eau potable est de 1 600 Km (diamètre de 63mm à 800mm).
Le nombre d’aboné pour l’île de Djerba est de 170 000 habitants dont 46% sont pour la
commune de Houmet Souk. L’arrondissement de Houmet Souk présente des taux élevés de
branchement en eau potable équivalent à 98 % en 2020. Toutefois, le taux de branchement
des zones périphériques rurales est inférieur (90% à Mellita et Erriadh) ce qui implique que
l’eau reste inaccessible pour certains ménages.
2.8.2 ELECTRIFICATION
L’île de Djerba est alimentée en électricité principalement par le poste de transformation situé
à Robbana, ce dernier est alimenté par une ligne haute tension venant de la centrale
thermique de Ghannouch, et une ligne venant de la centrale thermique de Médenine.
La consommation de l’électricité est la plus élevée à la commune de Houmet souk avec 48%
de la consommation de toute l’île. Le secteur du tourisme représente la majorité de la
consommation, suivie de la consommation domestique.
La commune de Houmt souk est dotée de deux stations de traitement des eaux usées comme
présenté dans le tableau suivant :
Les routes régionales sont formées de la RR117, RR116, et RR116E qui assurent en premier
lieu, la connexion entre les centres urbains principaux des communes de Midoun, Houmet
souk, et Ajim, et en deuxième lieu, la connexion entre l’île et le continent. En revanche, la
seule route reliant Djerba au continent est la RR117, qui part de Houmet souk et traverse le
centre de l’île pour mener à Zarzis et le Sud-Est.
L’état des routes classées, est satisfaisant suite aux travaux de leur modernisation réalisée
aussi bien par l’état que par la commune dans le cadre des différents programmes de
développement. Il n’en demeure que les voies de dessertes internes des quartiers ainsi que
plusieurs pistes agricoles ne sont pas revêtues ou nécessitant des travaux de modernisation.
Le territoire de Houmet Souk a une allure générale plate ne présentant que de légères
ondulations ne dépassant guère les 10 m. Au-delà d’un rayon de 5 km par rapport à la ville
de Houmet Souk, les altitudes accusent une remontée jusqu’à 20m sur les rebords du Dahar.
La ville de Houmet Souk est située sur une plaine de la côte Nord de l'île dépourvue de cours
d'eau, le drainage des eaux pluviales est assuré, dans la plupart des cas, superficiellement
en suivant les pentes des chaussées pour déboucher vers la mer.
Ci-après quelques photos d’illustration (fourni la commune de Houmet Souk) des zones de
stagnation et de cumule d’eau pluviale provoqués par la crue de décembre 2008 au niveau
de la ville.
La carte des zones de stagnation d’eau pluviale est donnée à la page ci-après
3751900,000000
ETUDE DE PROTECTION CONTRE LES INONDATIONS
DE LA VILLE DE HOUMET SOUK
Carte des zones de stagnation Echelle : 1/30 000
3751000,000000
3751000,000000
Rue Sidi Youcef
Rue Rimel
20
Ru
e
de
la
R ép
u bl i
11 19 qu e
3750100,000000
Rue Houcine Anen 26
5 es
17 Abb
Sidi
10 Rue 25
Ave
Ru e Elw a
Youcef
nue
24
Beni Bandou 23
Hab
i
a lah Ben
d
ib B
Touarit
Rue
9
3
o
Al-
urgu
7
4
eS
Ne
22
e
srin
Av
nu
an
Sidi M 16 21
e
e
Avenu es 2 Ru
3749200,000000
3749200,000000
os 8 e
e sR Ye
m Fatou Sidi Zayed
u ed Ezzaouia am
E en a
Av ra
15
16
ad
1
1
RR
dB
Rue de N
me
Ru
e
ha
nu
ce f
Av
M
eS
Mo
al ah B e n Yo u 13
id
14
o un
ue
12 Rue
en
rcisse
el i t a
de
Av
Mû
sM Jouamaa rie
Ver
Avenue
r
3748300,000000
3748300,000000
RL
Souani 10
31
des Oli
Ver
v
s
iers
Mi d
oun
6
11
RR
Légende :
3747400,000000
3747400,000000
Zone de stagnation
R R 117
Limite du PAU
0 0,5 1
Km
On note que la zone d’étude est dépourvue d’un réseau de drainage des eaux pluviale à
l’exception des trois (03) collecteurs réalisés par la commune de Houmet Souk au niveau du
secteur de Touarit. Dans d’autres zones de la ville, les eaux pluviales sont drainées
superficiellement en suivant les pentes des chaussées.
La carte des ouvrages hydrauliques existants dans la ville de Houmet Souk est présentée ci-
après.
3.4 CONCLUSIONS
3752000,000000
Carte des aménagements existants Echelle : 1/30 000
RL9 M
41 E
R
M
É
3751000,000000
3751000,000000
D
I T
E
R
R
A
N
É E
Boumlel
CE-2
CE-1
3750000,000000
RL9
3750000,000000
Beni Bandou 41
Touarit
CE-3
CE-3
.2
RL
RR1
10
30
17
E Fatou
1 16 CE-3
RR Sidi Zayed
3749000,000000
3749000,000000
Ezzaouia
1
- 3.
CE
RL
6
a
el i t
10
11
sM
31
RR
R R 117
3748000,000000
3748000,000000
Légende :
im
Collecteur existant
Aménagements existants
rs
Ve
Vers Zarzis
Route Locale
Route Régionale
CE-1 : Conduite en BA DN1000, L= 1200ml
Limite du PAU
CE-2 : Conduite en PVC DN500, L= 740ml
CE-3 : Conduite en PVC DN500, L= 2085ml
3747000,000000
3747000,000000
0 0,5 1 CE-3.1 : Conduite en PVC DN500, L= 1450ml
Km CE-3.2 : Conduite en PVC DN500, L= 190ml
4. ETUDE HYDROLOGIQUE
Le but de cette étude est de déterminer les débits fréquentiels pour chaque bassin versant
afin de quantifier la réponse hydrologique vis-à-vis un apport de précipitation. En effet ce
calcul de débit est basé sur les données pluviométriques et les caractéristiques
morphologiques de chaque bassin versant.
Pour la détermination des pluies journalières pour les différentes périodes de retour, on a
ajusté statistiquement une série des pluies maximales journalières qui ont été enregistrées au
niveau de la station de Djerba Houmet Souk pendant plus de 62 ans. Les caractéristiques de
la série pluviométrique enregistrée à cette station sont données par le tableau suivant :
Les valeurs de « a » et « b » relatives à la station de Matmata sont données par le tableau ci-
dessous :
La délimitation des bassins versants drainés par l’ensemble des écoulements a été opérée
sur la base des cartes topographiques de Houmet Souk (échelle :1/50 000), des images
satellitaires et ajustée par des visites de terrain.
La cartes délimitation des sous-bassins versants est présentée dans l’annexe N°01
Sur la base des images SRTM (Shuttle Radar Topography Mission) qui font référence aux
fichiers matriciels et vectoriels topographiques fournis par la NASA, un modèle numérique de
terrain de la zone d’étude a été élaboré. Cette caractérisation du relief permet une meilleure
gestion du territoire et des propriétés géomorphologiques des bassins versants.
La carte des pentes vise à présenter le relief à l’aide de valeurs de pente afin d’avoir une idée
précise sur le relief et de mieux caractérisé les ruissellements.
Les annexes N°02 et N°03 présentent les cartes de variation des altitudes et des pentes
relatifs aux sous-bassins versants.
Cette caractéristique géométrique est représentée par l’indice de compacité de Gravelius Kc,
définie comme le rapport entre le périmètre de bassin versant et le périmètre du cercle ayant
la même surface. L’indice de compacité est défini par la relation suivante :
0.28 𝑃
𝐾𝑐
√𝑆
Avec :
- Kc : indice de compacité de Gravelius,
- S: surface du bassin versant en Km2,
- P : périmètre du bassin versant en Km.
Cet indice est déterminé en mesurant le périmètre du bassin versant et sa surface. Il est
proche de (1) pour un bassin versant de forme quasiment circulaire et supérieur à (1) lorsque
le bassin est de forme allongée.
Le rectangle équivalent est caractérisé par sa longueur L et sa largeur l données par les
formules suivantes :
Longueur du rectangle équivalent :
Kc √S 1.128
𝐿 1 1
1.128 Kc
Largeur du rectangle équivalent :
Kc √S 1.128
l 1 1
1.128 Kc
Avec :
- Kc : coefficient de compacité de Gravelius,
- S : superficie (km²),
- L : longueur du rectangle équivalent (km),
- l : largeur du rectangle équivalent (km).
La détermination des pentes moyennes se fait en calculant les partielles de cours d’eau qui
s’effectue à partir du profil longitudinal du cours d’eau principal. La pente moyenne est
déterminée par la relation suivante :
∑𝐿
𝑃
∑
Avec :
- Pm : la pente moyenne du cours d’eau (m/m),
- Lk: longueur partielle du cours d’eau (m),
- Ik : pente de chaque tronçon du cours d’eau (m/m).
Les caractéristiques morphologiques des différents sous bassins versants délimités sont
consignées dans les tableaux ci-après :
SBV S(km²) P(km) Kc Tw (km) Léq (km) léq (km) Hmoy (m) P (%)
SBV-1 1.5 5.9 1.35 2.1 2.3 0.7 2.5 0.1
SBV-2 1.9 6.5 1.33 2.6 2.5 0.8 7.5 0.3
SBV-3 2.1 6.3 1.23 2.3 2.2 0.9 10.5 0.3
SBV-4 1.9 6.6 1.36 2.1 2.6 0.7 13.0 0.2
SBV-5 3.2 9.5 1.51 4.2 4.0 0.8 16.5 0.1
SBV-6 6.0 13.6 1.57 5.7 5.8 1.0 18.0 0.2
SBV-7 1.4 5.0 1.19 2.2 1.7 0.8 9.0 0.4
SBV-8 0.5 2.9 1.18 1.1 1.0 0.5 3.5 0.5
SBV-9 2.1 7.1 1.39 2.1 2.9 0.7 5.5 0.4
SBV-10 0.8 4.1 1.29 1.6 1.5 0.5 6.0 0.5
SBV-11 0.8 4.7 1.51 1.8 2.0 0.4 6.0 0.4
SBV-12 0.4 3.0 1.31 1.0 1.2 0.4 10.5 0.5
SBV-13 0.3 2.7 1.36 0.9 1.1 0.3 9.0 0.4
SBV-14 1.2 5.7 1.48 1.9 2.4 0.5 4.5 0.4
SBV-15 1.4 5.6 1.36 1.8 2.2 0.6 4.5 0.4
SBV-16 0.2 2.7 1.60 1.1 1.2 0.2 4.5 0.4
SBV-17 0.1 1.3 1.52 0.7 0.5 0.1 2.3 0.1
Avec :
- S : Superficie (km²), - Léq : Longueur équivalent (km),
- P : Périmètre (km), - Léq : Largeur équivalent (km),
- Kc : Indice de compacité, - Hmoy : Hauteur moyenne (m),
- Tw : Longueur Talweg (km), - P : Pente moyenne (%).
La formule de Kirpich qui date de 1940, a été élaborée à la suite des crues qui ont touché le
nord-est des États-Unis en 1936 (Folmar et al, 2007). Cette formule est largement utilisée en
Tunisie dans les calculs hydrologiques. Sa formulation est la suivante :
𝐿.
𝑡 0.945
𝐻 .
Avec :
- tc : temps de concentration (h).
- L : longueur du thalweg principal (km),
- H (m) : différence d’altitude des extrémités du Talweg.
Théoriquement le temps de concentration (tc) est le temps mis par une goutte d’eau pour
arriver au niveau de l’exutoire. Ce temps de concentration peut être déduit des mesures sur
le terrain estimé à l’aide de formules le plus souvent empiriques.
𝑆
𝑡 0,128
𝐼
Avec :
- tc : temps de concentration en heures,
- S : superficie en km2,
- I : pente du cours d’eau en m/m.
.
0.9 100 A
𝑡
√s C
Avec :
- tc : temps de concentration en min,
- S : pente en m/m,
- A : surface en Km2,
- C : coefficient de ruissellement.
Le tableau suivant récapitule le calcul de temps de concentration pour les sous bassins
versants :
L’analyse du tableau ci-dessus montre une corrélation intéressante entre les valeurs issues
des formules Ventura et Sogreah pour les sous bassins versants SBV-8, SBV-10, SBV-12,
SBV-13, SBV-16 et SBV-17 et une corrélation assez intéressante entre les valeurs issues des
formules Kirpich et Sogreah pour les restes des sous bassins versants.
En conclusion, le temps de concentration retenu pour chaque sous bassin versant peut être
estimé à la moyenne des deux formules les plus proches.
Les débits de crues probables, au niveau de la zone d’étude, sont estimés par l’application
des méthodes hydrologiques couramment utilisées. Les caractéristiques physiques, la valeur
des pentes et l'occupation du sol des sous-bassins versants ont été utilisées pour le choix des
méthodes d'évaluation des débits de crues.
Cette méthode a été adoptée dans le cadre du Projet National de Protection Contre les
Inondations. Elle a été adoptée pour le centre et le sud Tunisien.
.
𝑃 𝑃
𝑄 𝑆
12
Avec :
- QT : Débit de pointe de la crue de période de retour T (m3/s),
L’étude probabiliste des pluies journalières conduit à la formulation régionale des pluies de
temps de retour T qui suit une loi de Gumbel et qui est donc représentée par une droite dans
le plan Y, P :
Variable de Gumbel :
𝑦 𝐿𝑜𝑔 𝐿𝑜𝑔 1 1⁄ 𝑇
Pluie journalière :
𝑃 𝑎 𝑦 𝑦
Cette droite est bien définie si l’on fournit les deux valeurs :
- P10 = pluie décennale journalière, correspondant à y10 = 2,25,
- P20 = pluie de 20 ans, correspondant à y20 = 2,97,
- P50 = pluie de 50 ans, correspondant à y50 = 3,90,
- P100 = pluie centennale journalière, correspondant à y100 = 4,60.
En cas où nous ne disposons pas des données pluviométriques journalières maximales pour
certaines périodes de retour, ces données peuvent être déterminées par les équations
suivantes :
𝑃 𝑃 𝑃 𝑃 ⁄ 𝑦 𝑦 𝑦 𝑦 Pour T<100 ans
Au-delà de T=100 ans, on a une deuxième droite définie par P100 et par P1000 correspondant
à y1000 = 6,90.
Les hyétogrammes adoptés ont été établis en utilisant la méthode de Kieffer qui fournit
l’averse critique quelle que soit sa durée (annexe N°05).
Les résultats d’évaluation des débits de crues des sous bassins versants, pour les différentes
périodes de retour, sont illustrés dans le tableau suivant :
Débit (m3/s)
SBV S(Km2) Méthode de calcul
T10 T20 T50 T100
Méthode rationnelle 3.6 4.6 6.0 6.7
SBV-14 1.18 Méthode de SWMM 4.0 4.9 6.0 7.0
Méthode de SPEED 4.4 6.4 9.1 11.1
Méthode rationnelle 4.1 5.3 6.9 7.7
SBV-15 1.35 Méthode de SWMM 4.7 5.7 7.1 8.2
Méthode de SPEED 4.9 7.1 10.1 12.3
Méthode rationnelle 0.9 1.1 1.4 1.6
SBV-16 0.23 Méthode de SWMM 1.0 1.2 1.5 1.7
Méthode de SPEED 1.3 1.9 2.7 3.3
Méthode rationnelle 0.2 0.2 0.3 0.3
SBV-17 0.06 Méthode de SWMM 0.2 0.3 0.5 0.6
Méthode de SPEED 0.5 0.7 1.0 1.2
L’analyse des résultats obtenus par les différentes méthodes de calcul a permis de dégager
une corrélation intéressante entre les valeurs issues de la méthode rationnelle et le modèle
de SWMM, des débits calculés pour les différentes périodes de retour. Ainsi on peut adopter
le modèle de SWMM.
Le tableau suivant récapitule les débits de crues retenus pour les différentes périodes de
retour :
Les simulations hydrauliques sont effectuées par le logiciel Hec-Ras, afin de caractériser la
variation de la ligne d’eau au niveau des ouvrages. Hec-Ras résout l’équation de l’énergie
unidimensionnelle, les pertes de charge étant évaluées par la formule de frottement au fond
de Manning-Strickler et par des formules de contraction/expansion de l’écoulement.
En tenant compte des caractéristiques géométriques des ouvrages existants et les débits
fréquentiels à évacuer, la capacité de transit de chaque ouvrage a été évaluée. Ces
évaluations ont concerné les trois (03) collecteurs existants (CE-1, CE-2 et CE3) au niveau
du secteur Touarit.
La simulation de la ligne d’eau au niveau de la conduite existante CE-1 montre qu’à l’état
actuel, sa capacité ne permet même pas le passage d’une crue de fréquence vingtennale, ce
qui entraine des stagnations d’eau marqués au niveau du marché centrale (secteur de Touarit)
La simulation de la ligne d’eau au niveau du collecteur CE-3 montre qu’à l’état actuel, la
capacité de la conduite est incapable d’évacuer un débit de récurrence vingtennale (T20) et
son débordement au niveau des rues de Yemama et de Mûrier.
D’après d’évaluation des ouvrages existants, on remarque que les résultats de la simulation
par Hec-Ras sont relativement semblables à ceux donnés par la formule de Manning Strickler.
Ainsi on peut noter que les collecteurs existants CE-1, CE-2 et CE-3 ont des capacités de
transit inférieure à la fréquence vingtennale,
D’après ces résultats, on peut conclure que les stagnations d’eau au niveau du secteur de
Touarit (Zone N°13, N°15, N°16, N°17 et N°21) est causée principalement par la capacité
insuffisante des collecteurs existants.
GCEC INTERNATIONAL DHU
DIRECTION DE L’HYDRAULIQUE URBAINE REF N°07/2022
6.1.1 URBANISATION
Les aménagements projetés doivent tenir compte du plan d’aménagement urbain (PAU) de
la commune de Houmet Souk dont la révision était achevée en 2007, de l’état actuel de
l’urbanisation et du tracé naturel des écoulements, ainsi le tracé général des collecteurs suivra
la plus possible les voiries existantes et projetées.
Le schéma d’aménagement doit tenir compte de réseau des concessionnaires existants dans
l’emprise des collecteurs des eaux pluviales projetés. Il est indispensable de préciser
l’emplacement des différents réseaux souterrains et éventuel chevauchement avec le tracé
des collecteurs projetés.
Les ouvrages de rejet projetés doivent être implantés en respectant la limite du Domaine
Public Maritime (DPM).
Les schémas d’aménagement sont aussi orientés par l’intérêt économique et social attaché
aux ouvrages projetés : moindre coût, développement urbain...
Les aménagements projetés seront dimensionnés pour une période de retour vingtennale.
Ainsi tous les aménagements hydrauliques projetés, dans la zone d’étude, doivent avoir un
niveau de sécurité supérieur ou égal à T= 20ans.
Suite aux différentes visites de terrain, réunion avec des responsables de la commune de
Houmet Souk et afin de résoudre les problèmes de stagnation d’eau pluviales au niveau de
la ville, les aménagements proposés consistent à la création d’un réseau de drainage
permettant l’évacuation des eaux pluviales vers la mer.
Le schéma hydraulique d’assemblage des sous bassins versants est présenté ci-dessous.
Le collecteur projeté CP-1 assure l’interception d’une partie des apports provenant du sous-
bassin versant SBV-4 en longeant l’Avenue de Mohamed Badra (RR116) au niveau du secteur
Jouamaa. Il s’agit d’un dalot de dimension (1.5mx1.0m) et de longueur 1270ml qui assure
l’évacuation d’une crue vingtennale.
Le collecteur projeté CP-2 longe l’Avenue de Salah Ben Youcef (RL1030) au niveau du
secteur de Jouamaa moyennant d’un dalot de dimension (1.5mx1.0m) jusqu’à atteindre le
collecteur projeté CP-3.
Le collecteur projeté CP-3 assure le drainage des eaux pluviales du sous-bassin versant SBV-
4 au niveau de l’Avenue Salah Ben Youcef (secteur de Ezzaouia). Il s’agit d’un dalot de section
(3.0mx1.0m) et de longueur 810ml.
Le collecteur projeté CP-4 assure la collecte des eaux pluviales provenant du sous-bassin
versant SBV-3 en longeant l’Avenue des Roses (RR116E) au niveau du secteur d’Ezzaouia.
Il s’agit d’un dalot de dimension (3.0mx1.0m) et de longueur 1100ml qui assure
l’acheminement d’une crue vingtennale.
Le collecteur projeté CP-5 assure le drainage des apports provenant des sous-bassins
versants SBV-3 et SBV-4. Il longe la rue d’Elwadi (RL1030) au niveau du secteur de Beni
Bandou jusqu’à atteindre le collecteur projeté CP-7.
Le collecteur projeté CP-6 assure le drainage des eaux pluviales du sous-bassin versant SBV-
2 au niveau de la rue Mehrez Barkallah (secteur de Beni Bandou). Il s’agit d’un dalot de section
(2.0mx1.0m) et de longueur 745ml.
Le collecteur projeté CP-7 assure l’interception des apports provenant des sous-bassins
versants SBV-1, SBV-2, SBV-3 et SBV-4 en longeant la Rue de Rimel au niveau du secteur
Boumlel. Il s’agit d’un collecteur de dimension 2(3.0mx1.0m) et (2.0mx1.0m) et de longueur
1530ml qui assure l’évacuation d’une crue vingtennale.
Le collecteur projeté CP-8 assure le drainage des apports provenant du sous-bassin versant
SBV-14. Il longe la rue Sidi Youcef et rue Sidi Bousaid au niveau du secteur de Boumlel
moyennant un dalot de dimension (2.0mx1.0m) jusqu’à atteindre son rejet vers la mer.
Le collecteur projeté CP-9 assure le drainage des eaux pluviales du sous-bassin versant SBV-
13 au niveau de l’Avenue de Mohamed Badra (secteur de Ezzaouia). Il s’agit d’un dalot de
section (1.0mx1.0m) et de longueur 690ml.
Ce collecteur assure le drainage des eaux pluviale des sous bassins versants SBV-12, SBV-
13 et SBV-15. Il longe l’Avenue de Habib Bourguiba (RR117) au niveau du secteur de Boumlel
moyennant un dalot de dimension (3.0mx1.0m) jusqu’à atteindre le rejet vers la mer
Le collecteur projeté CP-13 assure le drainage des apports provenant du sous-bassin versant
SBV-10. Il longe la rue de Essalam, 20 Mars et Sidi Zitouni au niveau du secteur de Touarit
moyennant un dalot de dimension (2.0mx1.0m) pour déboucher vers la mer.
Le collecteur projeté CP-14 assure le drainage des eaux pluviales d’une partie du sous-bassin
versant SBV-5 au niveau de l’Avenue des Oliviers (Essouani). Il s’agit d’un dalot d’une section
(1.5mx1.0m) et de longueur 890ml.
Le collecteur projeté CP-15 longe l’Avenue de Salah Ben Youcef (RL1030) au niveau du
secteur Essouani. Il s’agit d’un dalot de dimension (1.5mx1.0m) et de longueur 495ml.
Le collecteur projeté CP-17 assure le drainage des apports provenant du sous-bassin versant
SBV-6. Il longe la rue de Midoun (Route Locale RL1031) au niveau du secteur de Essouani
moyennant un dalot de dimension (3.0mx1.0m) et de 1010ml de longueur.
Ce collecteur assure le drainage des eaux pluviale des sous bassins versants SBV-5 et SBV-
6. Il longe l’Avenue de Salah Ben Youcef (Route Locale RL1030) au niveau du secteur de
Fatou moyennant d’un collecteur en dalot de dimension 2(3.0mx1.0m) et de longueur 825ml.
Le collecteur projeté CP-20 assure le drainage des apports provenant des sous-bassins
versants SBV-5, SBV-6, SBV-7 et SBV-8. Il longe l’Avenue de Salah Ben Youcef au niveau
du secteur de Fatou moyennant d’un collecteur en dalot de dimension Dalot 2(3.0mx1.0m) et
(2.0mx1.0m) pour déboucher vers la mer.
Le collecteur projeté CP-21 assure le drainage des eaux pluviales du sous-bassin versant
SBV-9 au niveau de la rue du Mûrier (Secteur de Sidi Zayed). Il s’agit d’un dalot d’une section
(3.0mx1.0m) et de longueur 1650ml.
L’évaluation de capacité des ouvrages existants, situation avec projet, a été effectué en
considérant la création des collecteurs de drainage proposés par la présente étude. Le tableau
ci-dessous illustre les résultats de cette évaluation.
Figure 29: Simulation de la ligne d’eau au niveau du collecteur CE-1-Situation avec projet
La simulation de la ligne d’eau au niveau du collecteur existant CE-1 montre qu’à l’état projet,
cette conduite sera capable d’évacuer un débit de récurrence vingtennale sans aucun
débordement.
Figure 30: Simulation de la ligne d’eau au niveau du collecteur CE-2-Situation avec projet
La simulation de la ligne d’eau au niveau du collecteur existant CE-2 montre qu’à l’état projet,
sa capacité permettra d’évacuer un débit de fréquence vingtennale sans débordement.
Figure 31: Simulation de la ligne d’eau au niveau du collecteur CE-3-Situation avec projet
La simulation hydraulique du collecteur existant CE-3 montre, qu’à l’état projet, cette conduite
sera capable d’évacuer un débit d’une fréquence vingtennale sans aucun débordement.
3751900,000000
ETUDE DE PROTECTION CONTRE LES INONDATIONS
DE LA VILLE DE HOUMET SOUK
Carte des aménagements projetés Echelle : 1/30 000
3751000,000000
3751000,000000
Avenue Sidi Youcef
Rue Rimel
CP-7
Ru
e
de
CP-8
la
Ré
pub
l i qu e
ue Lahbib Th a m e r
Aven
Aven
Rue M
e h r ez Barkallah Boumlel
CP-11
CP-12
3750100,000000
3750100,000000
ue
CP-6
Sidi
R ue S a
Ave
Bou s
ûrier
Ru e Elw a
Youcef
nu
lam
CP-13
CP-20
aid
Rue du M
e Ha
a
Beni Bandou dr
CP-5
i Ba R ue 2 0 M a r s
a lah Ben
bib
d
Rue Si di Zitouni
ed
Bou
Touarit Rue
am
E
Mo h
rgui
nne
eS
CP sr
CP-
e -19
ba
ses CP Av
nu
ue
CP-21
Ro -3 Av
en
es CP
3749200,000000
3749200,000000
ed - 10 - 18
en
u -4 CP Sidi Zayed
Av CP
Ezzaouia Fatou
E
1 16 16
RR CP
-
Ru
e
nue ef
Av
Mi
c
Sal ah B e n Yo u
CP
do
CP
15
-
un
-
2
lita CP-
17
e
-1
rs M
CP
Souani
Ve
Avenue
Jouamaa
3748300,000000
3748300,000000
6
CP-14
11
RL1
des Oli
RR
031
v
Ver
iers
s
R R 117
Mi d
oun
Légende : CP-1 : Dalot (1.5mx1.0m), L=1270ml CP-8 : Dalot (2.0mx1.0m), L=1710ml CP-15 : Dalot (1.5mx1.0m), L=495ml
Ouvrage de rejet avec clapet CP-2 : Dalot (1.5mx1.0m), L=970ml CP-16 : Dalot (3.0mx1.0m), L=440ml
3747400,000000
3747400,000000
CP-9 : Dalot (1.0mx1.0m), L=690ml
Ouvrage de transition CP-3 : Dalot (3.0mx1.0m), L=810ml CP-10 : Dalot (2.0mx1.0m), L=1010ml CP-17 : Dalot (3.0mx1.0m), L=1010ml
Collecteur en dalot projeté CP-4 : Dalot (3.0mx1.0m), L=1100ml CP-18 : Dalot 2(3.0mx1.0m), L=825ml
CP-11 : Dalot (3.0mx1.0m), L=1500ml
Limite du PAU CP-5 : Dalot 2(3.0mx1.0m), L=735ml CP-19 : Dalot (2.0mx1.0m), L=690ml
CP-12 : Dalot (2.0mx1.0m), L=1280ml
CP-6 : Dalot (2.0mx1.0m), L=745ml CP-20 : Dalot 2(3.0mx1.0m)
CP-13 : Dalot (2.0mx1.0m), L=1715ml +(2.0mx1.0m), L=540ml
0 0,75 1,5 CP-7 : Dalot 2(3.0mx1.0m)
Km +(2.0mx1.0m), L=1530ml CP-14 : Dalot (1.5mx1.0m), L=890ml CP-21 : Dalot (3.0mx1.0m), L=1650ml
80 Collecteur CP-8
80-1 Démolition des chaussées existantes m2 6156 6 36 936
80-2 Déblais en terrain de toute nature m3 12927.6 7 90 493
80-3 Remblai en sable de concassage 0-4 m3 5950.8 15 89 262
80-4 Fourniture et mise en œuvre de gravier 5-12 m3 444.6 25 11 115
Hérisson 25/40 à mettre sous les ouvrages en
80-5 m3 889.2 30 26 676
béton armé
Fourniture, transport et mise œuvre de tout
80-6 m3 1231.2 30 36 936
venant 0-31.5
Fourniture, transport et mise œuvre de tout
80-7 m3 1231.2 30 36 936
venant 0-20
Revêtement de chaussée en enrobé
80-8 m2 6156 30 184 680
bitumineux de 6 cm d'épaisseur
Fourniture, transport et pose de dalots en
80-9 éléments préfabriqués de section intérieure ml 1710 700 1 197 000
(2.0x1.0)
80-10 Fourniture et pose de regard à grille préfabriqué U 98 750 73 500
Fourniture, transport et pose de conduite PVC
80-11 ml 392 80 31 360
DN 315
Fourniture et mise en place de cadre et tampon
80-12 U 49 350 17 150
en fonte
80-13 Rehausse préfabriquée en béton armé Dm 245 60 14 700
80-14 Bordure de trottoir en béton préfabriqué type T2 ml 500 25 12 500
80-15 Caniveau latéral en béton préfabriqué type CS2 ml 500 25 12 500
Exécution d'ouvrage de rejet y compris un
80-16 U 1 6 000 6 000
clapet anti-retour métallique
Total série 80 1 877 744
90 Collecteur CP-9
90-1 Démolition des chaussées existantes m2 1794 6 10 764
90-2 Déblais en terrain de toute nature m3 3767.4 7 26 372
90-3 Remblai en sable de concassage 0-4 m3 2125.2 15 31 878
90-4 Fourniture et mise en œuvre de gravier 5-12 m3 110.4 25 2 760
Hérisson 25/40 à mettre sous les ouvrages en
90-5 m3 220.8 30 6 624
béton armé
Fourniture, transport et mise œuvre de tout
90-6 m3 358.8 30 10 764
venant 0-31.5
Fourniture, transport et mise œuvre de tout
90-7 m3 358.8 30 10 764
venant 0-20
Revêtement de chaussée en enrobé
90-8 m2 1794 30 53 820
bitumineux de 6 cm d'épaisseur
Fourniture, transport et pose de dalots en
90-9 éléments préfabriqués de section intérieure ml 690 480 331 200
(1.0x1.0)
90-10 Fourniture et pose de regard à grille préfabriqué U 40 750 30 000
Fourniture, transport et pose de conduite PVC
90-11 ml 160 80 12 800
DN 315
Fourniture et mise en place de cadre et tampon
90-12 U 20 350 7 000
en fonte
90-13 Rehausse préfabriquée en béton armé Dm 100 60 6 000
L'analyse des impacts consiste à identifier, décrire et évaluer les impacts potentiels du projet
sur les composantes des milieux naturel et humain de la zone. La méthode retenue pour
évaluer l'importance probable des impacts repose sur l'identification des sources d'impacts et
sur trois critères fondamentaux que sont la durée, l'étendue et l'intensité de l'impact.
En premier lieu, la détermination des impacts positifs et négatifs potentiels est réalisée à l'aide
d'une grille d'interrelations entre les sources d'impact significatif et les composantes du milieu
touchées par le projet. Les sources d'impact potentiel sont identifiées selon les phases de
construction et d'exploitation du projet.
On procède ensuite à l'évaluation proprement dite des impacts potentiels des opérations sur
les principales composantes environnementales et sociales, en se basant sur des critères
prédéfinis. Cette évaluation consiste à déterminer l'importance de l'impact probable identifié
dans la matrice d'interrelation. Même si une telle évaluation peut parfois comporter un
jugement de valeur, elle permet tout de même d'établir des niveaux d'acceptabilité et de définir
les besoins en matière d'atténuation, de compensation, de surveillance et de suivi des
impacts. Une attention particulière est apportée à l'évaluation des impacts lorsque des
éléments sensibles du milieu sont potentiellement affectés.
Les composantes du milieu nommées aussi les récepteurs d’impact sont susceptibles d'être
affectés par l’impact du projet. Ces impacts varient d’un récepteur à l’autre lorsqu’il s’agit de
l’importance et le poids de l’impact, d’où un changement désormais significatif. Les
composantes du milieu peuvent être :
Le milieu humain telles les activités économiques, la santé publique, l’emploi, le
paysage, la qualité de vie des populations riveraines…
Le milieu physique (climat, microclimat, les eaux de surface, les eaux souterraines,
les sols),
Le milieu biologique (faune et flore…).
L’évaluation des impacts est basée sur une matrice des interrelations entre les activités du
projet, sources d’impacts et les éléments des milieux récepteurs : les milieux physiques,
biologiques et humains.
Le but de l’évaluation de ces impacts est d’affecter une importance relative aux impacts
associés au projet et ainsi, et par conséquent, de déterminer l’ordre de priorité selon lequel
les impacts doivent être évités, atténués ou compensés.
L’intensité de l’impact : consiste à juger le degré de perturbation du milieu, occasionné
par le projet. L’intensité de l’impact sera significative selon la valeur et la rareté de la
composante du milieu.
L’étendue d’un impact : fait référence à son influence sur le territoire en termes de
superficie. Une étendue ponctuelle ou zonale signifiera que seulement les environs
immédiats du milieu (zone du projet) seront perturbés ; et une étendue locale signifiera
que les environs plus lointains seront affectés.
La durée de l’impact : fait référence à sa portée dans le temps. Elle pourra être
temporaire ou permanente. Un impact temporaire sera associé à la notion de
réversibilité.
Ainsi, plus un impact sera intense, étendu et durable, plus il risquera d’être important,
particulièrement pour les composantes environnementales fortement valorisées ou sensibles.
L’importance des impacts varie donc selon les paramètres comme l’étendue, la durée et
l’intensité.
Grille d’interrelation des éléments du projet et des effets sur les milieux
physiques, biophysique et humain
Activité Evaluation de l’importance des impacts
Milieu Impacts
source Catégorie
affecté Identifiés Intensité Étendue Durée Ampleur Importance
d’impact d’impact
Phase des travaux
Milieu biophysique
Accélération de
l’érosion du sol et
risques de Négatif
Sols Faible Ponctuelle Courte Réversible Mineure
contamination Direct
par les produits
chimiques.
Pollution
Air et
atmosphérique et Négatif
climat Moyenne Locale Moyenne Réversible Mineure
nuisances Direct
sonore
sonores
Contamination
des eaux par les Négatif
Eaux Faible Ponctuelle Moyenne Irréversible Majeure
Installation polluants Direct
du chantier chimiques
Milieu humain
Production de
déchets
Cadre de Négatif
constitués de Faible Ponctuelle Courte Réversible Majeure
vie Direct
gravats et de
débris végétaux.
Nuisances
sonores liées à
l’utilisation Négatif
Bruits Moyenne Ponctuelle Moyenne Réversible Moyenne
d’engins Direct
produisant de
grands bruits.
Milieu biophysique
Accélération de
l’érosion du sol et
risques de Négatif
Sols Faible Ponctuelle Courte Réversible Mineure
contamination Direct
par les produits
chimiques
Pollution
Dégageme
atmosphérique et
nt des Négatif
Air et dégradation de la Moyenne Locale Moyenne Réversible Moyenne
emprises Direct
climat qualité du climat
et
sonore sonore
constructio
Démolition de Négatif
n des Forte Locale Longue Irréversible Majeure
bâtis Direct
ouvrages
Déguerpissement
des ménages et Négatif
Forte Locale Longue Irréversible Majeure
des activités Direct
Milieu économiques
humain Développement Positif
Forte Locale Longue Irréversible Moyenne
d’emplois Direct
Développement Positif
Moyenne Locale Longue Irréversible Moyenne
circonstanciel Indirect
Tout au long de la période d’exécution, et par conséquent des différents travaux nécessaire
pour l’achèvement du projet, des problèmes apparaitront comme ; la pollution lumineuse et
sonore, le non-respect de la propreté de la zone, la non protection de la zone d’exécution, les
conflits avec les habitants et les propriétaires. En outre la possibilité d’expropriations causera
certainement des problèmes et des conflits avec les habitant considérés par l’évacuation, et
comme résultat la perturbation du rendement économique de la zone. A ce niveau l’impact
sur le milieu humain sera négatif, plus ou moins durable (en fonction des solutions qui seront
apportées) et d'importance moyenne.
Mais, il faut dévoiler aussi les impacts positifs des travaux de ce projet sur le milieu humain.
En point de vue économique, l’existence des travaux peut stimuler l’activité économique de la
région (commerce, restauration, services…) ou bien par l’intégration de locaux entant que
main d’œuvre temporaire. On peut dire alors que l’impact à ce stade-là est positif.
Pour cette phase d’exploitation, les impacts seront dus essentiellement aux fonctionnements
des aménagements projetés :
Améliorer les conditions de sécurité en diminuant les dégâts qui peuvent être
engendrés par les crues, Ceci aura pour conséquence la protection des habitants et
de leurs biens.
Amélioration de la productivité du secteur agricole par la facilité de l’écoulement des
produits sur les marchés, situés dans les villes limitrophes.
Le fonctionnement des aménagements n’influe ni sur le climat ni sur l’atmosphère.
Les débits de crues seront mieux régulés, les débordements au niveau des
écoulements seront quasiment supprimés jusqu’à la fréquence du projet, et les
zones de stagnation des eaux constituant autant de niches de production de
moustiques et de multiplication parasitaire seront asséchées. Ceci devrait donc avoir
un impact positif décisif sur la santé publique
Les travaux de protection contre les inondations de la ville de Houmet Souk sont limités dans
le temps. Cependant, les incidences possibles peuvent être limitées dans une large mesure,
ou supprimées en respectant les normes réglementaires en vigueur et en privilégiant certaines
techniques de chantier.
En effet :
La limitation de la durée des travaux constitue une bonne action pour limiter les
impacts de la phase chantier à l'environnement humain.
Réduire le bruit par l'emploi d'engins insonorisés (compresseur, groupes
électrogènes, marteaux piqueurs,).
Lutte contre la nuisance du bruit :
- L’installation de chantier sera située à au moins 500 m du point de démarrage
des travaux
- Informer les riverains sur les phases les plus bruyantes du chantier : horaires,
durée, ainsi que sur les dispositions prises pour diminuer les nuisances.
- Sensibiliser les intervenants du chantier à la nécessité d’adopter des
comportements ou pratiques moins bruyantes, en évitant notamment les
chutes de matériels, les alarmes de recul des engins, les cris.
- Organiser le chantier de manière à limiter l'impact des engins bruyants et à ne
pas positionner les accès ou voies de circulation du chantier au droit de zones
occupées par des riverains.
- Etablir, s’il y a lieu, un plan de circulation des engins réduisant les marches
arrière d’engins.
- Préférer des engins électriques ou hydrauliques aux matériels pneumatiques
et assurer un entretien régulier du matériel.
- Utiliser des matériels de puissance suffisante pour limiter le régime moteur et
veiller à ne pas laisser fonctionner des engins inutilement.
- Adapter la dimension et la puissance de l’engin à la tâche à accomplir.
Réduire les poussières produites surtout en période estivale par l'arrosage des
pistes et aires non goudronnées.
Assurer l'entretien des chaussées dégradées par les engins de chantier, les
véhicules de transport et d'approvisionnement, pour éviter toute nuisance aux
usagers.
Vérifier régulièrement le bon fonctionnement de tous les engins du chantier en vue
d'éviter toute consommation excessive de carburants ou émissions intolérables de
gaz.
Veiller à un stockage des matériaux du chantier et des hydrocarbures à l'abri des
intempéries (pluies et vents) et des eaux de ruissellement. Le stockage doit être
réalisé dans des bacs ou bassins étanches et fermés.
Prévoir une fosse septique permettant la collecte des eaux sanitaires produites par
les ouvriers, dans le but d'éviter toutes nuisances de ces rejets à l'environnement
humain et naturel proche (sol, nappe, oued,..).
Les ordures ménagères produites par les ouvriers doivent être ramassées,
entreposées dans des récipients adaptés que l'on placera à un point correctement
aménagé à cet effet, en vue d'éviter la dispersion des déchets (soit par les agents
naturels, soit par les animaux errants).
Remettre dans les conditions initiales le domaine touché par le chantier.
Minimiser la nuisance par les bruits et les vibrations des engins par l’entretien
régulier des véhicules et le choix d’un circuit de transport loin des zones
résidentielles.
Le respect des règles relatives à la limitation de l’accès public au chantier, à la
circulation des véhicules à l’intérieur de celui-ci et au port de casques, gants et
chaussures de sécurité par les ouvriers, constitue l’élément de base que la direction
de chantier est tenue d’appliquer avec rigueur.
Pour empêcher l'érosion, on placera aux points de déversement des dalles de béton ou autre
matériaux solidement ancrées.
3752500,000000
DE LA VILLE DE HOUMET SOUK
Carte de délimitation des SBV Echelle : 1/50 000
3751000,000000
3751000,000000
SBV-1
SBV-17
SBV-14
SBV-16
SBV-15
3749500,000000
3749500,000000
SBV-11 SBV-8
SBV-2
SBV-10
SBV-13
SBV-9
SBV-12 SBV-7
SBV-3
3748000,000000
3748000,000000
SBV-4
SBV-5
SBV-6
3746500,000000
3746500,000000
Légende :
3745000,000000
3745000,000000
Limite de sous-bassin versant
Sens d'écoulement
0 1,25 2,5
Km
3752500 ,000000
DE LA VILLE DE HOUMET SOUK
Carte de variation des altitudes Echelle : 1/50 000
3751000 ,000000
3751000 ,000000
SBV-1
SBV-14
SBV-15 SBV-17
SBV-11
SBV-16
SBV-8
3749500 ,000000
3749500 ,000000
SBV-2
SBV-10
SBV-13
SBV-9
SBV-12 SBV-7
SBV-3
3748000 ,000000
3748000 ,000000
SBV-4
SBV-5 SBV-6
Légende :
3746500 ,000000
3746500 ,000000
Limite de sous-bassin versant
Elevation (m)
0m - 4m
4m - 9m
9m - 14m
3745000 ,000000
3745000 ,000000
14m - 19m
19m - 30m
0 1,25 2,5
Km
3752500 ,000000
DE LA VILLE DE HOUMET SOUK
Carte des pentes Echelle : 1/50 000
3751000 ,000000
3751000 ,000000
SBV-1
SBV-14
SBV-15 SBV-17
SBV-11
SBV-16
SBV-8
3749500 ,000000
3749500 ,000000
SBV-2
SBV-10
SBV-13
SBV-9
SBV-12 SBV-7
SBV-3
3748000 ,000000
3748000 ,000000
SBV-4
SBV-5 SBV-6
Légende :
Limite de sous-bassin versant
3746500 ,000000
3746500 ,000000
Pente (%)
0% - 2,5%
2,5%- 5,0%
5,0% - 7,5%
7,5% - 10,0%
3745000 ,000000
3745000 ,000000
10,0% - 12,5%
12,5% - 15,0%
0 1,25 2,5
Km
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CMS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 05/18/2023 00:00:00
Ending Date .............. 05/18/2023 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------------
Total Total Total Total Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment mm mm mm mm mm mm mm 10^6 ltr CMS
------------------------------------------------------------------------------------------------------------------------------
SVB-1 32.97 0.00 0.00 2.62 7.94 6.64 14.58 22.26 3.85 0.442
SVB-4 32.97 0.00 0.00 2.62 7.98 7.26 15.24 28.56 5.07 0.462
SVB-5 32.97 0.00 0.00 2.62 7.43 3.54 10.97 34.60 4.72 0.333
SVB-3 32.97 0.00 0.00 2.62 8.04 8.25 16.29 34.70 6.37 0.494
SVB-6 32.97 0.00 0.00 2.62 7.48 3.71 11.19 66.58 9.27 0.339
SVB-2 32.97 0.00 0.00 2.62 7.98 7.22 15.20 29.38 5.21 0.461
SVB-12 32.97 0.00 0.00 2.62 8.21 14.88 23.09 9.75 2.05 0.700
SVB-13 32.97 0.00 0.00 2.62 8.21 14.65 22.86 6.99 1.46 0.693
SVB-7 32.97 0.00 0.00 2.62 8.09 9.41 17.50 24.62 4.66 0.531
SVB-8 32.97 0.00 0.00 2.62 8.20 13.98 22.18 11.07 2.29 0.673
SVB-10 32.97 0.00 0.00 2.62 8.16 11.66 19.82 16.09 3.19 0.601
SVB-9 32.97 0.00 0.00 2.62 8.10 9.73 17.84 37.58 7.17 0.541
SVB-11 32.97 0.00 0.00 2.62 8.12 10.37 18.49 14.18 2.74 0.561
SVB-14 32.97 0.00 0.00 2.62 8.10 9.74 17.84 21.00 4.00 0.541
SVB-15 32.97 0.00 0.00 2.62 8.11 9.98 18.09 24.50 4.70 0.549
SVB-16 32.97 0.00 0.00 2.62 8.19 13.34 21.53 4.97 1.02 0.653
SVB-17 32.97 0.00 0.00 2.62 8.24 17.08 25.32 3.27 0.73 0.215
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CMS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 05/18/2023 00:00:00
Ending Date .............. 05/18/2023 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------------
Total Total Total Total Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment mm mm mm mm mm mm mm 10^6 ltr CMS
------------------------------------------------------------------------------------------------------------------------------
SVB-1 38.68 0.00 0.00 2.62 9.36 8.58 17.94 27.40 4.74 0.464
SVB-4 38.68 0.00 0.00 2.62 9.41 9.35 18.76 35.15 6.23 0.485
SVB-5 38.68 0.00 0.00 2.62 8.83 4.64 13.47 42.48 5.92 0.348
SVB-3 38.68 0.00 0.00 2.62 9.47 10.58 20.04 42.69 7.79 0.518
SVB-6 38.68 0.00 0.00 2.62 8.89 4.85 13.74 81.75 11.62 0.355
SVB-2 38.68 0.00 0.00 2.62 9.41 9.30 18.71 36.16 6.39 0.484
SVB-12 38.68 0.00 0.00 2.62 9.64 18.48 28.12 11.87 2.47 0.727
SVB-13 38.68 0.00 0.00 2.62 9.64 18.21 27.85 8.52 1.77 0.720
SVB-7 38.68 0.00 0.00 2.62 9.52 12.00 21.52 30.28 5.68 0.556
SVB-8 38.68 0.00 0.00 2.62 9.63 17.44 27.07 13.51 2.76 0.700
SVB-10 38.68 0.00 0.00 2.62 9.59 14.71 24.30 19.73 3.86 0.628
SVB-9 38.68 0.00 0.00 2.62 9.53 12.39 21.93 46.20 8.72 0.567
SVB-11 38.68 0.00 0.00 2.62 9.55 13.16 22.72 17.42 3.33 0.587
SVB-14 38.68 0.00 0.00 2.62 9.53 12.40 21.93 25.81 4.87 0.567
SVB-15 38.68 0.00 0.00 2.62 9.54 12.69 22.23 30.10 5.71 0.575
SVB-16 38.68 0.00 0.00 2.62 9.62 16.69 26.31 6.08 1.23 0.680
SVB-17 38.68 0.00 0.00 2.62 9.67 20.97 30.64 3.95 0.88 0.326
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CMS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 05/18/2023 00:00:00
Ending Date .............. 05/18/2023 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------------
Total Total Total Total Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment mm mm mm mm mm mm mm 10^6 ltr CMS
------------------------------------------------------------------------------------------------------------------------------
SVB-1 46.14 0.00 0.00 2.62 11.22 11.31 22.53 34.40 5.94 0.488
SVB-4 46.14 0.00 0.00 2.62 11.27 12.28 23.55 44.14 7.77 0.511
SVB-5 46.14 0.00 0.00 2.62 10.67 6.21 16.88 53.24 7.58 0.366
SVB-3 46.14 0.00 0.00 2.62 11.33 13.82 25.15 53.57 9.68 0.545
SVB-6 46.14 0.00 0.00 2.62 10.72 6.50 17.22 102.47 14.84 0.373
SVB-2 46.14 0.00 0.00 2.62 11.27 12.22 23.49 45.40 7.98 0.509
SVB-12 46.14 0.00 0.00 2.62 11.51 23.30 34.81 14.69 3.03 0.755
SVB-13 46.14 0.00 0.00 2.62 11.51 22.99 34.50 10.56 2.16 0.748
SVB-7 46.14 0.00 0.00 2.62 11.38 15.58 26.97 37.94 7.02 0.585
SVB-8 46.14 0.00 0.00 2.62 11.50 22.10 33.60 16.77 3.38 0.728
SVB-10 46.14 0.00 0.00 2.62 11.45 18.87 30.33 24.63 4.75 0.657
SVB-9 46.14 0.00 0.00 2.62 11.40 16.07 27.46 57.87 10.78 0.595
SVB-11 46.14 0.00 0.00 2.62 11.42 17.01 28.43 21.80 4.11 0.616
SVB-14 46.14 0.00 0.00 2.62 11.40 16.07 27.47 32.33 6.02 0.595
SVB-15 46.14 0.00 0.00 2.62 11.41 16.43 27.84 37.69 7.05 0.603
SVB-16 46.14 0.00 0.00 2.62 11.49 21.22 32.71 7.56 1.50 0.709
SVB-17 46.14 0.00 0.00 2.62 11.54 26.13 37.67 4.86 1.08 0.539
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CMS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 05/18/2023 00:00:00
Ending Date .............. 05/18/2023 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------------
Total Total Total Total Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment mm mm mm mm mm mm mm 10^6 ltr CMS
------------------------------------------------------------------------------------------------------------------------------
SVB-1 52.23 0.00 0.00 2.62 12.74 13.69 26.43 40.36 6.92 0.506
SVB-4 52.23 0.00 0.00 2.62 12.79 14.83 27.62 51.76 9.04 0.529
SVB-5 52.23 0.00 0.00 2.62 12.18 7.61 19.79 62.40 8.97 0.379
SVB-3 52.23 0.00 0.00 2.62 12.86 16.62 29.47 62.78 11.23 0.564
SVB-6 52.23 0.00 0.00 2.62 12.23 7.96 20.19 120.12 17.55 0.386
SVB-2 52.23 0.00 0.00 2.62 12.79 14.75 27.54 53.24 9.29 0.527
SVB-12 52.23 0.00 0.00 2.62 13.04 27.33 40.37 17.04 3.49 0.773
SVB-13 52.23 0.00 0.00 2.62 13.04 26.99 40.03 12.25 2.49 0.766
SVB-7 52.23 0.00 0.00 2.62 12.91 18.66 31.57 44.41 8.12 0.604
SVB-8 52.23 0.00 0.00 2.62 13.03 26.01 39.04 19.48 3.89 0.747
SVB-10 52.23 0.00 0.00 2.62 12.98 22.41 35.39 28.73 5.47 0.677
SVB-9 52.23 0.00 0.00 2.62 12.92 19.21 32.14 67.71 12.46 0.615
SVB-11 52.23 0.00 0.00 2.62 12.94 20.29 33.23 25.49 4.74 0.636
SVB-14 52.23 0.00 0.00 2.62 12.92 19.22 32.14 37.83 6.96 0.615
SVB-15 52.23 0.00 0.00 2.62 12.93 19.63 32.56 44.09 8.15 0.623
SVB-16 52.23 0.00 0.00 2.62 13.02 25.04 38.05 8.79 1.73 0.729
SVB-17 52.23 0.00 0.00 2.62 13.07 30.40 43.47 5.61 1.24 0.647
PROJECT DATA
Project Title: Simulation Hec Ras PCI Houmet Souk
Project File : SimulationHecRas.prj
Run Date and Time: 05/12/2023 8:08:08 PM
Project in SI units
PLAN DATA
Plan Title: Plan 01
Plan File : e:\PCI Houmet Souk-DHU\1-Phase-APS\8-Hec RAS\SimulationHecRas.p01
Computation Options
Critical depth computed only where necessary
Conveyance Calculation Method: At breaks in n values only
Friction Slope Method: Average Conveyance
Computational Flow Regime: Subcritical Flow
FLOW DATA
Boundary Conditions
River Reach Profile Upstream Downstream
River 1 Reach 1 T20 Normal S = 0,003
River 10 Reach 10 T20 Normal S = 0,003
River 11 Reach 11 T20 Normal S = 0,003
River 12 Reach 12 T20 Normal S = 0,003
River 13 Reach 13 T20 Normal S = 0,003
River 14 Reach 14 T20 Normal S = 0,003
River 2 Reach 2 T20 Normal S = 0,003
River 3 Reach 3 T20 Normal S = 0,003
River 4 Reach 4 T20 Normal S = 0,003
River 5 Reach 5 T20 Normal S = 0,003
River 6 Reach 6 T20 Normal S = 0,003
River 7 Reach 7 T20 Normal S = 0,003
River 8 Reach 8 T20 Normal S = 0,003
River 9 Reach 9 T20 Normal S = 0,003
Inline Structure Gate Openings
River = River 1
Reach = Reach 1 RS = 1.2
Gate = Gate #1
# Open Open Ht
1 2
River = River 10
Reach = Reach 10 RS = 1.5
Gate = Gate #1
# Open Open Ht
1 2
River = River 10
Reach = Reach 10 RS = 1.5
Gate = Gate #2
# Open Open Ht
1 1
River = River 12
Reach = Reach 12 RS = 1.6
Gate = Gate #1
# Open Open Ht
1 1
River = River 5
Reach = Reach 5 RS = 1.5
Gate = Gate #1
# Open Open Ht
1 1
River = River 7
Reach = Reach 7 RS = 1.3
Gate = Gate #1
# Open Open Ht
1 1
River = River 9
Reach = Reach 9 RS = 1.5
Gate = Gate #1
# Open Open Ht
1 1
GEOMETRY DATA
Geometry Title: Houmet Souk
Geometry File : e:\PCI Houmet Souk-DHU\1-Phase-APS\8-Hec RAS\SimulationHecRas.g01
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 13 2 13 2 11.6 8.8 11.6 8.8 13
10.8 13
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 481 25 481 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 8
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.645 2 11.645 2 10.245 8.8 10.245 8.8 11.645
10.8 11.645
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
0 .012 0 .012 10.8 .012
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 8750 481 25 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 7
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.291 2 10.291 2 8.891 8.8 8.891 8.8 10.291
10.8 10.291
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 7500 481 25 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 6
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.936 2 8.936 2 7.536 8.8 7.536 8.8 8.936
10.8 8.936
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 6250 481 25 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 5
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.581 2 7.581 2 6.181 8.8 6.181 8.8 7.581
10.8 7.581
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 5000 481 25 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 4
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.227 2 6.227 2 4.827 8.8 4.827 8.8 6.227
10.8 6.227
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 3750 481 25 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 3
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.872 2 4.872 2 3.472 8.8 3.472 8.8 4.872
10.8 4.872
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 2500 481 25 0 0
CROSS SECTION
RIVER: River 1
REACH: Reach 1 RS: 2
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.517 2 3.517 2 2.117 8.8 2.117 8.8 3.517
10.8 3.517
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 1250 481 25 0 0
INLINE STRUCTURE
RIVER: River 1
REACH: Reach 1 RS: 1.2
INPUT
Description:
Distance from Upstream XS = 10
Deck/Roadway Width = 10
Weir Coefficient = 1.4
Weir Embankment Coordinates num = 2
Sta Elev Sta Elev
0 3.52 10 3.52
Upstream Embankment side slope = 10 horiz. to 1.0 vertical
Downstream Embankment side slope = 10 horiz. to 1.0 vertical
Maximum allowable submergence for weir flow = .98
Elevation at which weir flow begins =
Weir crest shape = Broad Crested
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 100 100 100 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9 2 9 2 7.6 11.2 7.6 11.2 9
13.2 9
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 9,4375*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.569 2 8.569 2 7.169 11.2 7.169 11.2 8.569
13.2 8.569
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 8,8750*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.137 2 8.137 2 6.737 11.2 6.737 11.2 8.137
13.2 8.137
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 7,7500*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.275 2 7.275 2 5.875 11.2 5.875 11.2 7.275
13.2 7.275
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 6,6250*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.412 2 6.412 2 5.012 11.2 5.012 11.2 6.412
13.2 6.412
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.55 2 5.55 2 4.15 11.2 4.15 11.2 5.55
13.2 5.55
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 4,9375*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.119 2 5.119 2 3.719 11.2 3.719 11.2 5.119
13.2 5.119
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 3,8125*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.256 2 4.256 2 2.856 11.2 2.856 11.2 4.256
13.2 4.256
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: 2,6875*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.394 2 3.394 2 1.994 11.2 1.994 11.2 3.394
13.2 3.394
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
INLINE STRUCTURE
RIVER: River 10
REACH: Reach 10 RS: 1.5
INPUT
Description:
Distance from Upstream XS = 10
Deck/Roadway Width = 10
Weir Coefficient = 1.4
Weir Embankment Coordinates num = 2
Sta Elev Sta Elev
0 3.39 12 3.39
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 100 100 100 3 0
CROSS SECTION
RIVER: River 10
REACH: Reach 10 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.531 2 2.531 2 1.131 11.2 1.131 11.2 2.531
13.2 2.531
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 143 143 143 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 14 2 14 2 12.6 11.2 12.6 11.2 14
13.2 14
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 9,3077*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 13.795 2 13.795 2 12.395 11.2 12.395 11.2 13.795
13.2 13.795
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 8,6154*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 13.589 2 13.589 2 12.189 11.2 12.189 11.2 13.589
13.2 13.589
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 7,9231*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 13.384 2 13.384 2 11.984 11.2 11.984 11.2 13.384
13.2 13.384
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 6,5385*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.973 2 12.973 2 11.573 11.2 11.573 11.2 12.973
13.2 12.973
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 5,8462*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.768 2 12.768 2 11.368 11.2 11.368 11.2 12.768
13.2 12.768
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 4,4615*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.357 2 12.357 2 10.957 11.2 10.957 11.2 12.357
13.2 12.357
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 3,7692*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.152 2 12.152 2 10.752 11.2 10.752 11.2 12.152
13.2 12.152
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 2,3846*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.741 2 11.741 2 10.341 11.2 10.341 11.2 11.741
13.2 11.741
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.33 2 11.33 2 9.93 11.2 9.93 11.2 11.33
13.2 11.33
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 100 100 100 3 0
CROSS SECTION
RIVER: River 11
REACH: Reach 11 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.535 2 11.535 2 10.135 11.2 10.135 11.2 11.535
13.2 11.535
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 13.2 68 68 686 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 13 2 13 2 11.6 4.4 11.6 4.4 13
6.4 13
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 9,3077*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.767 2 12.767 2 11.367 4.4 11.367 4.4 12.767
6.4 12.767
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 8,6154*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.534 2 12.534 2 11.134 4.4 11.134 4.4 12.534
6.4 12.534
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 7,9231*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.301 2 12.301 2 10.901 4.4 10.901 4.4 12.301
6.4 12.301
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 6,5385*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.835 2 11.835 2 10.435 4.4 10.435 4.4 11.835
6.4 11.835
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 5,8462*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.602 2 11.602 2 10.202 4.4 10.202 4.4 11.602
6.4 11.602
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 4,4615*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.135 2 11.135 2 9.735 4.4 9.735 4.4 11.135
6.4 11.135
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 3,7692*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.902 2 10.902 2 9.502 4.4 9.502 4.4 10.902
6.4 10.902
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 2,3846*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.436 2 10.436 2 9.036 4.4 9.036 4.4 10.436
6.4 10.436
INLINE STRUCTURE
RIVER: River 12
REACH: Reach 12 RS: 1.6
INPUT
Description:
Distance from Upstream XS = 10
Deck/Roadway Width = 10
Weir Coefficient = 1.4
Weir Embankment Coordinates num = 2
Sta Elev Sta Elev
0 10.44 6 10.44
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.97 2 9.97 2 8.57 4.4 8.57 4.4 9.97
6.4 9.97
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 100 100 100 3 0
CROSS SECTION
RIVER: River 12
REACH: Reach 12 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.203 2 10.203 2 8.803 4.4 8.803 4.4 10.203
6.4 10.203
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 77 77 77 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8 2 8 2 6.6 4.4 6.6 4.4 8
6.4 8
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 9,1000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.793 2 7.793 2 6.393 4.4 6.393 4.4 7.793
6.4 7.793
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 8,2000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.586 2 7.586 2 6.186 4.4 6.186 4.4 7.586
6.4 7.586
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 7,3000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.379 2 7.379 2 5.979 4.4 5.979 4.4 7.379
6.4 7.379
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 6,4000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.172 2 7.172 2 5.772 4.4 5.772 4.4 7.172
6.4 7.172
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
0 .012 0 .012 6.4 .012
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.965 2 6.965 2 5.565 4.4 5.565 4.4 6.965
6.4 6.965
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 4,6000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.758 2 6.758 2 5.358 4.4 5.358 4.4 6.758
6.4 6.758
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 3,7000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.551 2 6.551 2 5.151 4.4 5.151 4.4 6.551
6.4 6.551
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 2,8000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.344 2 6.344 2 4.944 4.4 4.944 4.4 6.344
6.4 6.344
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.93 2 5.93 2 4.53 4.4 4.53 4.4 5.93
6.4 5.93
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 100 100 100 3 0
CROSS SECTION
RIVER: River 13
REACH: Reach 13 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.137 2 6.137 2 4.737 4.4 4.737 4.4 6.137
6.4 6.137
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 69 69 69 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11 2 11 2 9.6 8.8 9.6 8.8 11
10.8 11
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 9,4706*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.709 2 10.709 2 9.309 8.8 9.309 8.8 10.709
10.8 10.709
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 8,9412*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.418 2 10.418 2 9.018 8.8 9.018 8.8 10.418
10.8 10.418
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 7,8824*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.835 2 9.835 2 8.435 8.8 8.435 8.8 9.835
10.8 9.835
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 6,8235*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.253 2 9.253 2 7.853 8.8 7.853 8.8 9.253
10.8 9.253
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 5,7647*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.671 2 8.671 2 7.271 8.8 7.271 8.8 8.671
10.8 8.671
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 4,7059*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.088 2 8.088 2 6.688 8.8 6.688 8.8 8.088
10.8 8.088
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 3,6471*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.506 2 7.506 2 6.106 8.8 6.106 8.8 7.506
10.8 7.506
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 2,5882*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.924 2 6.924 2 5.524 8.8 5.524 8.8 6.924
10.8 6.924
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.05 2 6.05 2 4.65 8.8 4.65 8.8 6.05
10.8 6.05
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 100 100 100 0 0
CROSS SECTION
RIVER: River 14
REACH: Reach 14 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.341 2 6.341 2 4.941 8.8 4.941 8.8 6.341
10.8 6.341
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 97 97 97 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 16 2 16 2 14.6 3.9 14.6 3.9 16
5.9 16
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48.077 48.077 48.077 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 9,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 15.398 2 15.398 2 13.998 3.9 13.998 3.9 15.398
5.9 15.398
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 8,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 14.194 2 14.194 2 12.794 3.9 12.794 3.9 14.194
5.9 14.194
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 7,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 12.99 2 12.99 2 11.59 3.9 11.59 3.9 12.99
5.9 12.99
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 6,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11.785 2 11.785 2 10.385 3.9 10.385 3.9 11.785
5.9 11.785
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.581 2 10.581 2 9.181 3.9 9.181 3.9 10.581
5.9 10.581
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 4,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.377 2 9.377 2 7.977 3.9 7.977 3.9 9.377
5.9 9.377
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 3,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.173 2 8.173 2 6.773 3.9 6.773 3.9 8.173
5.9 8.173
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
0 .012 0 .012 5.9 .012
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 2,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.969 2 6.969 2 5.569 3.9 5.569 3.9 6.969
5.9 6.969
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 48 48 48 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.1625 2 5.1625 2 3.7625 3.9 3.7625 3.9 5.1625
5.9 5.1625
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 100 100 100 0 0
CROSS SECTION
RIVER: River 2
REACH: Reach 2 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.996 2 5.996 2 4.596 3.9 4.596 3.9 5.996
5.9 5.996
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 96 96 96 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10 2 10 2 8.6 3.9 8.6 3.9 10
5.9 10
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 9,3571*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.804 2 9.804 2 8.404 3.9 8.404 3.9 9.804
5.9 9.804
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 8,7143*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.607 2 9.607 2 8.207 3.9 8.207 3.9 9.607
5.9 9.607
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 7,4286*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.214 2 9.214 2 7.814 3.9 7.814 3.9 9.214
5.9 9.214
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 6,7857*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.018 2 9.018 2 7.618 3.9 7.618 3.9 9.018
5.9 9.018
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.625 2 8.625 2 7.225 3.9 7.225 3.9 8.625
5.9 8.625
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 4,8571*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.429 2 8.429 2 7.029 3.9 7.029 3.9 8.429
5.9 8.429
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 3,5714*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.036 2 8.036 2 6.636 3.9 6.636 3.9 8.036
5.9 8.036
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 2,9286*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.839 2 7.839 2 6.439 3.9 6.439 3.9 7.839
5.9 7.839
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.25 2 7.25 2 5.85 3.9 5.85 3.9 7.25
5.9 7.25
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 100 100 100 3 0
CROSS SECTION
RIVER: River 3
REACH: Reach 3 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.446 2 7.446 2 6.046 3.9 6.046 3.9 7.446
5.9 7.446
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 78 78 78 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4 2 4 2 2.6 4.4 2.6 4.4 4
6.4 4
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49.667 49.667 49.667 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 9,4000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.876 2 3.876 2 2.476 4.4 2.476 4.4 3.876
6.4 3.876
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 8,8000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.752 2 3.752 2 2.352 4.4 2.352 4.4 3.752
6.4 3.752
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 7,6000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.503 2 3.503 2 2.103 4.4 2.103 4.4 3.503
6.4 3.503
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 6,4000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.255 2 3.255 2 1.855 4.4 1.855 4.4 3.255
6.4 3.255
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 5,8000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.131 2 3.131 2 1.731 4.4 1.731 4.4 3.131
6.4 3.131
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 4,6000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.883 2 2.883 2 1.483 4.4 1.483 4.4 2.883
6.4 2.883
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 3,4000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.634 2 2.634 2 1.234 4.4 1.234 4.4 2.634
6.4 2.634
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 2,8000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.51 2 2.51 2 1.11 4.4 1.11 4.4 2.51
6.4 2.51
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.1375 2 2.1375 2 .7375 4.4 .7375 4.4 2.1375
6.4 2.1375
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 100 100 100 3 0
CROSS SECTION
RIVER: River 4
REACH: Reach 4 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.262 2 2.262 2 .862 4.4 .862 4.4 2.262
6.4 2.262
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 6.4 49 49 49 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6 2 6 2 4.6 5.4 4.6 5.4 6
7.4 6
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 9,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.762 2 5.762 2 4.362 5.4 4.362 5.4 5.762
7.4 5.762
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 8,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.287 2 5.287 2 3.887 5.4 3.887 5.4 5.287
7.4 5.287
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 7,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.812 2 4.812 2 3.412 5.4 3.412 5.4 4.812
7.4 4.812
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 6,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.338 2 4.338 2 2.938 5.4 2.938 5.4 4.338
7.4 4.338
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.862 2 3.862 2 2.462 5.4 2.462 5.4 3.862
7.4 3.862
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 4,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.388 2 3.388 2 1.987 5.4 1.987 5.4 3.388
7.4 3.388
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 3,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.912 2 2.912 2 1.512 5.4 1.512 5.4 2.912
7.4 2.912
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 2,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.438 2 2.438 2 1.038 5.4 1.038 5.4 2.438
7.4 2.438
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
INLINE STRUCTURE
RIVER: River 5
REACH: Reach 5 RS: 1.5
INPUT
Description:
Distance from Upstream XS = 10
Deck/Roadway Width = 10
Weir Coefficient = 1.4
Weir Embankment Coordinates num = 2
Sta Elev Sta Elev
0 2.44 7 2.44
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 1.725 2 1.725 2 .325 5.4 .325 5.4 1.725
7.4 1.725
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 100 100 100 3 0
CROSS SECTION
RIVER: River 5
REACH: Reach 5 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 1.962 2 1.962 2 .562 5.4 .562 5.4 1.962
7.4 1.962
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 95 95 95 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10 2 10 2 8.6 5.4 8.6 5.4 10
7.4 10
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147.647 147.647 147.647 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 9,4706*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.557 2 9.557 2 8.157 5.4 8.157 5.4 9.557
7.4 9.557
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 8,9412*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.114 2 9.114 2 7.714 5.4 7.714 5.4 9.114
7.4 9.114
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 7,8824*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.228 2 8.228 2 6.828 5.4 6.828 5.4 8.228
7.4 8.228
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 6,8235*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.342 2 7.342 2 5.942 5.4 5.942 5.4 7.342
7.4 7.342
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 5,7647*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.456 2 6.456 2 5.056 5.4 5.056 5.4 6.456
7.4 6.456
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 4,7059*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.571 2 5.571 2 4.171 5.4 4.171 5.4 5.571
7.4 5.571
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 3,6471*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.685 2 4.685 2 3.285 5.4 3.285 5.4 4.685
7.4 4.685
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 2,5882*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.799 2 3.799 2 2.399 5.4 2.399 5.4 3.799
7.4 3.799
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.47 2 2.47 2 1.07 5.4 1.07 5.4 2.47
7.4 2.47
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 100 100 100 3 0
CROSS SECTION
RIVER: River 6
REACH: Reach 6 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.913 2 2.913 2 1.513 5.4 1.513 5.4 2.913
7.4 2.913
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 7.4 147 147 147 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 11 2 11 2 9.6 3.9 9.6 3.9 11
5.9 11
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49.286 49.286 49.286 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 9,3571*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.877 2 10.877 2 9.477 3.9 9.477 3.9 10.877
5.9 10.877
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 8,7143*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.754 2 10.754 2 9.354 3.9 9.354 3.9 10.754
5.9 10.754
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 7,4286*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.507 2 10.507 2 9.107 3.9 9.107 3.9 10.507
5.9 10.507
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 6,7857*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.384 2 10.384 2 8.984 3.9 8.984 3.9 10.384
5.9 10.384
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.137 2 10.137 2 8.738 3.9 8.738 3.9 10.137
5.9 10.137
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 4,8571*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 10.014 2 10.014 2 8.614 3.9 8.614 3.9 10.014
5.9 10.014
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 3,5714*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.768 2 9.768 2 8.368 3.9 8.368 3.9 9.768
5.9 9.768
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 2,9286*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.645 2 9.645 2 8.245 3.9 8.245 3.9 9.645
5.9 9.645
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
INLINE STRUCTURE
RIVER: River 7
REACH: Reach 7 RS: 1.3
INPUT
Description:
Distance from Upstream XS = 10
Deck/Roadway Width = 10
Weir Coefficient = 1.4
Weir Embankment Coordinates num = 2
Sta Elev Sta Elev
0 9.65 5 9.65
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.275 2 9.275 2 7.875 3.9 7.875 3.9 9.275
5.9 9.275
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 100 100 100 3 0
CROSS SECTION
RIVER: River 7
REACH: Reach 7 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9.398 2 9.398 2 7.998 3.9 7.998 3.9 9.398
5.9 9.398
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.9 49 49 49 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6 2 6 2 4.6 8.8 4.6 8.8 6
10.8 6
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 9,3077*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.705 2 5.705 2 4.305 8.8 4.305 8.8 5.705
10.8 5.705
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 8,6154*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.409 2 5.409 2 4.009 8.8 4.009 8.8 5.409
10.8 5.409
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 7,9231*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.114 2 5.114 2 3.714 8.8 3.714 8.8 5.114
10.8 5.114
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 6,5385*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.523 2 4.523 2 3.123 8.8 3.123 8.8 4.523
10.8 4.523
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 5,8462*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.228 2 4.228 2 2.828 8.8 2.828 8.8 4.228
10.8 4.228
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 4,4615*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.637 2 3.637 2 2.237 8.8 2.237 8.8 3.637
10.8 3.637
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 3,7692*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 3.342 2 3.342 2 1.942 8.8 1.942 8.8 3.342
10.8 3.342
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 2,3846*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.751 2 2.751 2 1.351 8.8 1.351 8.8 2.751
10.8 2.751
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: 1
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.16 2 2.16 2 .76 8.8 .76 8.8 2.16
10.8 2.16
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 100 100 100 0 0
CROSS SECTION
RIVER: River 8
REACH: Reach 8 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 2.455 2 2.455 2 1.055 8.8 1.055 8.8 2.455
10.8 2.455
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 10.8 98 98 98 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 10
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 9 2 9 2 7.6 3.4 7.6 3.4 9
5.4 9
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 9,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.714 2 8.714 2 7.314 3.4 7.314 3.4 8.714
5.4 8.714
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 8,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 8.142 2 8.142 2 6.742 3.4 6.742 3.4 8.142
5.4 8.142
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 7,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 7.571 2 7.571 2 6.171 3.4 6.171 3.4 7.571
5.4 7.571
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 6,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.999 2 6.999 2 5.599 3.4 5.599 3.4 6.999
5.4 6.999
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 5,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 6.427 2 6.427 2 5.028 3.4 5.028 3.4 6.427
5.4 6.427
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 4,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.856 2 5.856 2 4.456 3.4 4.456 3.4 5.856
5.4 5.856
Manning's n Values num= 3
Sta n Val Sta n Val Sta n Val
0 .012 0 .012 5.4 .012
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 3,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 5.284 2 5.284 2 3.884 3.4 3.884 3.4 5.284
5.4 5.284
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: 2,5000*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.712 2 4.712 2 3.312 3.4 3.312 3.4 4.712
5.4 4.712
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 95 95 95 0 0
INLINE STRUCTURE
RIVER: River 9
REACH: Reach 9 RS: 1.5
INPUT
Description:
Distance from Upstream XS = 10
Deck/Roadway Width = 10
Weir Coefficient = 1.4
Weir Embankment Coordinates num = 2
Sta Elev Sta Elev
0 4.71 5 4.71
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.
0 5.4 100 100 100 3 0
CROSS SECTION
RIVER: River 9
REACH: Reach 9 RS: ,999999*
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 4.141 2 4.141 2 2.741 3.4 2.741 3.4 4.141
5.4 4.141
Bank Sta: Left Right Lengths: Left Channel Right Coeff Contr. Expan.