1 BIGOUMAI 19A0301P CONSTRUCTION D’UN COMPLEXE HÔTELIER DURABLE SUR
NGAIBI JOSEPH LES BERGES DU MAYO-KALIO : CONCEPTION ET ETUDE
2 AMOUI ABDOU 19A0286P LITHOSTABILISATION DE L’ARGILE GONFLANTE AU SABLE :
CAS DES TRAVAUX DE RÉHABILITATION DE LA ROUTE RN1A SECTION MALTAM-BODO-MAKARY. 3 DIKSIA 21D0544EP ETUDE TECHNIQUE EN VUE DE LA RECONSTRUCTION DU MITCHOU LUC TRONÇONS CARREFOUR PARA-FOND NATIONAL DE L’EMPLOI AVEC POUR REVÊTEMENT LE BÉTON COMPACTÉ AU ROULEAU(BCR).
4 KENGNE 21D0540EP ETUDES COMPARATIVES D’OUVRAES DE
FOKOUA FRANCHISSEMENTS SUR LA RIVIÈRE LANDJOUDE HUDREL (Yokadouma, Cameroun)
5 KENGNE 19A0340P ETUDES TECHNIQUES POUR LA CONSTRUCTION D’UN PONT
LENOU CHRIST ET CES VOIES D’ACCÈS SUR LA LOUETSI à IDEMBE AU GABON.
6 KALTOUMI 19A0335P ELABORATION D’UN GUIDE TECHNIQUE D’ETUDE
HAMIDOU MAL CONCEPTION, ET DIMENSIONNEMENT D’UN CHÂTEAU OUMAR D’EAU DE 2500M DANS LE BUT DE CONTRIBUER A L’OPPROVISIONNEMENT EN EAU POTABLE DANS LA VILLE DE MAROUA AU CAMEROUN 7 ELLONG 21D0517EP DIMENSIONNEMENT D’UN HANGAR MÉTALLIQUE DOUMBE JACQUES GUY
8 DONTSOP 21D0545EP DIMENSIONNEMENT D’UN PONT MIXTE (acier-béton) SUR
LAURINCE FONDATION PROFONDE « application sur le pont de Palar sur le CHIMIGUE Mayo-Kaliao »
9 MOUYONG A 19A0371P PROJET D’EXTENSION DU CONSEIL REGIONAL DU
OLOMO GERRI LITTORAL MARIE JULIETTE
10 ALIOUM 19A0284P METHODE DE RENFORCEMENT DE LA CHAUSSÉ SOUPLE :
MAMOUDOU cas d’entretien routier, tronçon Maroua-Laf
11 JEUNANG GUY 20C0634EP CONCEPTION, ÉTUDE STRUCTURALE ET VERIFICATION AU
PERIN POINÇONNEMENT DES PLANCHERS AVEC OPTIMISATION : CAS D’UN BÂTIMENT SOUS SOL ET HUIT (8) ETAGES CONTREVENTE PAR VOILE, A USAGE D’HABITATION ET DE COMMERCE A YAOUNDÉ 12 ABDOURAMAN 17Y169P ETUDE DE DURABILITÉ ET DE LA RESISTANCE DES HAYATOU STUCTURES EN BETON COMPACTÉ AU ROULEAU : ANALYSE DES PROPRIÉTÉS MECANIQUES ET DE LA PERFORMANCE A LON TERMES.
13 ALADJI 18A0334P ETUDE ARCHITECTURALES ET STRUCTURALES D’UN
LAWANE BATIMENT DE TYPE R+1 A L’USAGE ADMINISTRATIF SUR UN BOUBA SOL ARGILEUX : CAS DE L’HOTEL DE VILLE DE GUEME.
ABOUBAKARY 19A0280P DIMENSIONNEMENT ET SUIVI DES TRAVAUX D’EXÉCUTION
14 AMINOU D’UN BÂTIMENT DE TYPE R+2 A USAGE ADMINISTRATIF :LE CAS DES TRAVAUX DE CONSTRUCTION DU SECTEUR DES DOUANES DU NORD A GAROUA.
15 LONTSI FOPA 19A0350P CONCEPTION DES FONDATIONS PARASISMIQUE EN ZONE
BEAULIN INONDABLE : cas d’un immeuble 2SS+R+10 à usage de bureau (Yaoundé, Cameroun).
16 OUMAROU 19A0600P CONCEPTION ET DIMENSIONNEMENT D’UN PONT A POUTRE EN
WANEGAM0 BETON ARME DE 90ML POUR LE FRANCHISSEMENT DU MAYO VOULKO SUR LE TRONCON POLI-VOKO DEPARTEMENT DU FARO REGION DU NORD.
17 KOUAYEP 19A0346P ETUDE STRUCTURALE EN VUE DE LA
NKUISSI RESTRUCTURATION D’UN EDIFICE EN INTEGRANT LES CHRISTIAN TRAVAUX DE REPRISE EN SOUS-ŒUVRE : CONSTRUCTION D’UN COMPLEXE MIXTE COMMERCIAL ET HABITATION POUR LE COMPTE DE LA SCI-BABOUM ( SS+R+4). 18 DIEUTCHOU 19A0311P PLANIFICATION ; ORGANISATION ET COORDINATION FRANCK DES TRAVAUX DE REALISATION D’UN COMPLEXE DARLIN HÔTELIER DANS LA VILLE DE MAROUA (CAMEROUN).
19 GUIEDI DAMA 19A0329P ETUDE ARCHITECTURALES ET STRUCTURALES D’UN
DENISE OUVRAGE : CAS DES TOURS JUMELLES DANS LA VILLE DE MAROUA (CAMEROUN). 20 SAM SOGWA 21D0533EP ARCHITECTURE BIOCLIMATIQUE : ETUDE OUMAROU ARCHITECTURALLE ET STRUCURALE D’UN HOTEL GERVAIS ECOLOGIQUE DANS LA VILLE DE MAROUA. 21 BADAWE 19A0292P ETUDE TECHNIQUE DES BATIMENTS A USAGE ABEL EDUCATIF : CAS D’UN COMPLEXE SCOLAIRE DANS LA VILLE DE MAROUA AU LIEU DIT FLORINA