GUIDELINES
DRAFT
CONTENTS
SECTION A: PROJECT DESCRIPTION 4
1. Introduction 4
2. Vision 4
1. General specifications 5
2. Guidelines specific to individual dwellings 5
2.1 Plot coverage 5
2.2 Setbacks & site disturbance zones 5
2.3 Height restrictions 6
2.4 Covered terraces 6
2.5 Materials 6
2.6 External openings 7
2.7 Outbuildings 8
2.8 Gate, boundary walls & fences 8
2.9 Television aerials & satellite dishes 9
2.10 Air conditioning 9
2.11 Landscaping / Stormwate 10
2.12 Solar panel / Solar heaters / Photovoltaic panels 10
2.13 Water storage tanks 10
2.14 Sewage & grease traps , leaching field / Micro STP 10
2. Construction activities 12
2.1 Working hours 12
2.2 Site establishment 12
2.3 Site access and exit 12
3. Contractors conduct 13
4. Disclaimer 14
CONTENTS
SECTION C: MANDATORY PROCEDURES (Continued) 15
5. Sustainable guidelines - General note (For all plots) 15
5.1 Electricity & energy efficiency – Encouraged 15
5.2 Water management – Encouraged 16
5.3 Waste management – Encouraged 16
5.4 Sewer and waste water - Encouraged 17
5.5 Building infrastructure - Encouraged 17
5.6 Infrastructure management - Recommended 18
Annexure A (Part 1) 19
Annexure A (Part 2) 20
Annexure B (Part 1) 21
Annexure B (Part 2) 22
Annexure C (Part 1) 23
Annexure C (Part 2) 24
Annexure D 25
Annexure E 26
Annexure F (Part 1) 27
Annexure F (Part 2) 28
SECTION A: PROJECT DESCRIPTION
1. Introduction
The Developer and Controlling Architect for the Magenta Parkside Morcellement have set up certain
design guidelines and procedures, which must be adhered to by the land owners during the design,
construction, and maintenance phases.
The Architectural Guidelines have been very carefully drafted in order to establish a collective architectural
language without inhibiting the creativity of design.
The purpose of these design guidelines is to offer architectural inspiration and guidance that will foster
a unity of materials and finish, ensuring the harmony of the overall development is thereby guaranteed.
The design criteria and rules set out in the document are in addition to the local authority’s requirements
and national building regulations of Mauritius. These guidelines may by amended and/or updated by the
Syndic from time to time.
2. Vision
The long term vision for the Magenta Parkside is to create a thriving and aesthetically pleasing residential
area that serves the community’s needs in harmony with the local environment and neighbouring
development.
The developer’s intent in this development is to ensure that the architecture and landscaping result in a
Morcellement sympathetic to the natural coastal setting and avoid any overpowering architecture that
will eclipse the landscape.
4
SECTION B: ARCHITECTURAL CONTROL & GUIDELINES
1. General Specifications
Where materials and forms are specified no variation from these will be permitted.
Any road, green space &/or boundary wall built by the developer should not in any way be modified
without prior permission from the Syndic.
It is the responsibility of the individual owners that their boundary walls, fences, gates etc. from date
of taking ownership of their properties, where applicable, are kept in a neat & intact state.
Planting shall be done by the developer & Maintenance to landscaped areas along road reserves
will be carried out by the Syndic.
No consideration for further subdivision of plots will be allowed.
No more than one dwelling per plot.
Prior to construction, the owner is to ensure that their plot is kept clean and neat in appearance
failing which the Syndic will arrange for the necessary cleaning to be done at the owner’s cost.
Building type is restricted to residential dwellings for all plots.
Building Setbacks:
5
SECTION B: ARCHITECTURAL CONTROL & GUIDELINES
2.5 Materials
Roofs
Single storey dwellings:
• Roofs will be either 100% flat, or a combination of flat and pitch.
• For a combination of Flat roof and pitched roof, a minimum of 50% of the floor area is
to be covered by pitched roofs and remaining area to be flat roof.
(Refer to Annexure F)
6
SECTION B: ARCHITECTURAL CONTROL & GUIDELINES
Walls
External walls to be painted.
A maximum of two wall colours and one feature wall colour /texture can
be used for the external walls.
Colour chart proposed.
(Refer to Annexure E)
Garage Doors:
(Refer to Annexure E)
7
SECTION B: ARCHITECTURAL CONTROL & GUIDELINES
a. Boundary Walls:
General boundary walls are to be a maximum of 1.8m high (from
natural ground level) where a 1.8m boundary wall/ fence will be
provided by the Promoter. Boundary wall to comprise of plastered
masonry &/or Volcanic stone. If painted, the boundary wall colours
are to comply with (General Wall Colours). All boundary walls are to
be plastered on both sides.
b. Fences:
Fences are to be a maximum of 1.8m high “Betafence” (or similar
approved by syndic).
c. Timber Screens:
Timber Screens to be maximum 1.8m high (within plot area).
d. Hedges:
Maximum 1.8m high hedges will be permitted as long as they are
located within the site boundaries or as agreed with adjacent owners
and well maintained by the owner.
8
SECTION B: ARCHITECTURAL CONTROL & GUIDELINES
3. Entrance Gates
The owner shall supply, erect and maintain his own entrance gates.
4. Services Area:
Bin area/T-walls to be on plot (will not be excluded from sellable area) and to
be built by the owner.
The service duct from the CEB pillar (where applicable) to the plot will be
handed over to the owner even if it is outside the plot boundary.
CEB pillars area will not form part of sellable plot area (CEB pillar area shall be
deducted from sellable area).
All television aerials, satellite dishes or any such devices must be fixed out of
sight, preferably within the roof space. It must not be visible from the street.
9
SECTION B: ARCHITECTURAL CONTROL & GUIDELINES
40% of the surface Area of each plot to be permeable i.e 40% of Softscape.
No stormwater runoff from the plots is allowed on the roads reserves.
Soft landscaping should be more predominant to the hardscape.
Solar heated hot water systems and Photovoltaic panels are encouraged but
must be concealed from view behind parapet walls.
Solar panels (Split system) to be installed at roof level, where the remote tank
to be hidden. Combined tank and panels on the roof are not allowed.
Micro STP are encouraged. Micro STP and Absorption Pit to follow guidelines
as per the PPG (Planning Policy Guidelines). External waste or waste pipes are
not allowed above the finished external ground level.
10
SECTION C: MANDATORY PROCEDURES
Working Drawings
The detailed design and working drawings and the signed and
marked checklist as provided by the syndic must be submitted.
(Refer to Annexure D)
• Site plan.
• Plans
of all floors, all elevations and 2 sections (The Syndic may
require more sections if 2 do not provide adequate information).
• Roof plan (can be combined with site plan).
11
SECTION C: MANDATORY PROCEDURES
The Syndic may inspect the works at any stage during construction and may
request any reasonable alterations and/or additions to ensure that the
approved plans are implemented. The homeowner is responsible to notify the
Syndic as to when the stages of completion as set out above have been
reached in order to arrange for the building controller to inspect the works.
2. Construction Activities
As the building within the residential estate will be constructed over a lengthy time
period, the following guidelines have been formulated for the benefit of residents:
Working Hours
Site Establishment
12
SECTION C: MANDATORY PROCEDURES
3. Contractors Conduct
a) The
owner will be responsible for the contractor’s conduct and for any damage caused
to the common property.
b) Construction will be limited from Monday to Friday and Saturday with working hours being between
07h30 to 18h00 and 07h30 to 13h00 respectively unless otherwise specified in the BLUP.
c) No Contractor or any of his personnel will have access to the development outside the
specified hours. Contractors may arrange for security on the construction site.
d) Delivery time for all material, plant, machinery, etc. will be from 7:30 AM to 18:00 PM,
Monday to Friday and Saturday morning from 7:30 AM to 13:00 PM.
f) Contractors are encouraged to co- ordinate delivery times with suppliers to be within this period,
as no claims for extra time will be granted as a result of deliveries outside the specified time.
g) The speed limit of 40km/h will apply on the access roads. Speeding and reckless driving will not
be tolerated. Due care must also be taken by all vehicles not to block the thoroughfare of roads.
h) Hoarding of the site is compulsory during construction and the Contractors shall endeavor
whenever possible to limit unnecessary noise, especially employee loud talking, shouting
or whistling, radios, sirens or hooters, motor revving etc.
i) No pets, birds, or domestic animals of the contractors will be permitted onto the Estate.
k) The site is to be kept as clean as possible of building rubble. General cleaning and good
housekeeping practice must take place during building operations.
l) The Contractor shall provide adequate facilities for waste & rubble disposal and ensure that
the workers use the provided facilities and that the rubbish is removed whenever required
or when skips are full. No waste may be burnt or buried on site. No form of paper, cement
bags, tile off cuts, ceiling boards, roof tiles, rubble, or the like is to be left lying around, nor
be allowed to blow off the site.
m) Fires for cooking or other purposes will not be permitted, and Contractors shall ensure
approved alternative meal arrangements are made.
n)No concrete, cement or such may be temporally stored, mixed or prepared on any of the
roadways, kerbs and pavements.
o) The Contractor is responsible for the discipline of his labour, sub-contract labour and
delivery personnel on site.
13
SECTION C: MANDATORY PROCEDURES
4. Disclaimer
4.1 The above document and its content are fully understood and the Owner and his Contractor undertake
to comply with the above items, in addition to any further controls which may be instituted by the
Syndic from time to time in the form of a written notification. Contractor shall ensure compliance by
any sub-contractors employed by the plot owner and or Contractor, and any suppliers to contractors,
sub-contractors or owners.
a) The role of the appointed controlling architect is to only scrutinize architectural set
submitted for Syndic approval and reporting to the Syndic.
b) The controlling architect does so against the architectural guidelines & assesses the
general compliance to the same.
c) The onus is on the plot owner & its appointed design architect to ensure that all the
requirements laid out in the architecture guidelines have been met.
d) The controlling architect scrutinizes the submitted drawings on behalf of the Syndic and
recommends to the Syndic whether the drawings / project submitted should be approved
or not approved.
f) It is understood and agreed that the controlling architect shall NOT be held responsible
for any discrepancies or non-conformities due to design by others. Any approval by the
Syndic does not relieve the plot owner and his design architect of their responsibility /
ownership of design. Onus remains with the plot owner to ensure full compliance with the
Guidelines, General Statutory Rules and prevailing regulations such as PPG.
4.3 It is the Syndic’s prerogative to include in these Architectural guidelines any other guidelines deemed
necessary, as and when deemed necessary.
4.4 The Magenta Parkside has been prepared by Architects’ Studio Ltd on behalf of the Developer, who
endorses same.
14
SECTION C: MANDATORY PROCEDURES
SUSTAINABLE INFRASTRUCTURE
The term “Infrastructure” means the basic physical and organizational structures and
facilities needed for a country, region, or organisation to function properly.
The term typically refers to the technical structures that support a society, such as roads,
bridges, water supply, sewers, electrical grids, telecommunications, and so forth, and
can be defined as the physical components of interrelated systems providing
commodities and services essential to enable, sustain, or enhance societal living
conditions.
The design emphasis for such an infrastructure is towards the development of sustainable
communities by ensuring that infrastructural knowledge makes improvements that do not
deplete or adversely affect natural resources.
The transition and mass adoption of renewable resources and strategies feature heavily in
sustainable infrastructures.
The use of Air-conditioning must be strictly minimised due to the extremely high
energy consumption as well as the high Ozone Depletion potential.
15
SECTION C: MANDATORY PROCEDURES
Internal lighting must maximize use of natural daylight, including through skylights
and clerestory windows.
LED or other low/zero energy lighting sources must be used for all lighting, external
and internal. Internal and External Lighting efficiency should be improved using a
lighting management with ambient light/motion sensors/timers.
High efficiency external lighting systems must be implemented including but not
limited to LED/ low energy lights, motion sensors, time clock, and/or photo
sensitive cells to control operation hours
All external lighting including for Signage must be both LED/low energy and solar
powered wherever possible.
Water metering system and savings must be implemented using water efficient devices.
Water from Air-conditioning condensation drips should be collected and used for
irrigation and other purposes. These drips should be properly dealt with and not
allowed to collect/puddle anywhere or stain material finishes.
All plots are strongly encouraged to have a Waste Management strategy in order
to minimise waste & re-use/ recycle on-plot where possible.
16
SECTION C: MANDATORY PROCEDURES
No regular refuse disposal will be permitted on site particularly those that violate
the quality of the environment like burning rubbish, dumping industrial waste into
water sources/on adjacent plots etc.
Removal of refuse from the plot will be done by the syndic.
All plots are encouraged to have an on-site sewer treatment system (STP), in
place. Same shall be fully operational and compliant with rules and regulations.
Micro STP are encouraged.
Grey water / non potable water generated from on site micro STP shall be
recycled / used for irrigation.
Discharge of Grey Water shall be compliant in terms of volume and water quality
to norms and regulations.
System for managing Sewer flow savings including grey water recycling must be
implemented and grease traps need to be provided as well.
Ventilation rates within buildings should meet the highest environmental standards
of ASHRAE or equivalent as applicable to prevent:
All Building construction and building maintenance materials & products must be
chosen carefully to avoid emission of air pollutants especially but not limited to
VOC’s
Solvents are required to spread a protective or decorative film which are typically
aliphatic hydrocarbons, ethyl acetate, glycol ethers, and acetone. In place of
these, products with aqueous solvents should be used instead.
17
SECTION C: MANDATORY PROCEDURES
It is recommended to have education and training of all staff for achieving and
maintaining sustainable infrastructure and sustainable buildings on each
individual plot.
The training protocol should also include information about the green systems in
the precinct as a whole and how the staff can contribute towards maintaining it.
- cleaning and maintenance using confirmed solvents and methods that have no
adverse environmental impact
- minimizing energy use by switching off lights, devices, appliances, AC’s etc. when
not in use
- regular maintenance of plumbing systems including pipes, valves, taps to minimise
leaks and consequent water wastage within the building and outside.
18
ANNEXURE A (PART 1)
19
ANNEXURE A (PART 2)
20
ANNEXURE B (PART 1)
21
ANNEXURE B (PART 2)
22
ANNEXURE C (PART 1)
23
ANNEXURE C (PART 2)
24
ANNEXURE D
Annexure D
21
25
ANNEXURE E
Annexure E
22
26
ANNEXURE F (PART 1)
Annexure F (Part 1)
23
27
ANNEXURE F (PART 2)
Annexure F (Part 2)
24
28