affaire 99-44-913 SICAP BERANGER R+7

DESCENTE DE CHARGES AU PLANCHER HAUT SOUS-SOL


(note BET GAUDILLAT du 17/07/99 par LOUM)
N plan BA

N note Loum

Permanente Exploitation
b (m)

K10
K11
K12
K13
K14
K15
K16
K17
K24
K25
K26
K4
K5
K6
K7
K8
K9
K18
K19
K20
K21
K22
K23
CH
K1
K2
K3
CH1
CH2
CH3
CH4
CH5
CH6
CH7

N9
N12
N14
N5
N7
N10
N13
N1
N2
N17
N16
N4
N6
N8
N11
N15
N3
VOILE N5
VOILE N5
VOILE N5
VOILE N5
VOILE N5
VOILE N5
VOILE N5
VOILE N6
VOILE N6
VOILE N6
VOILE N6
VOILE N6
VOILE N6
VOILE N7/ V4
VOILE N7/ V4
VOILE N7/ V4
VOILE N7/ V4

h (m)
0.27
0.27
0.27
0.27
0.27
0.27
0.27
0.2
0.2
0.2
0.9
0.27
0.27
0.27
0.27
0.15
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2

Cloisons

H (m)
1.5
1.5
0.8
2
2.5
0.85
1.05
1.25
1
0.3
0.9
2
2.5
2
3
0.8
0.3
34.46
34.46
34.46
34.46
34.46
34.46
34.46
34.46
34.46
34.46
34.46
34.46
34.46
21.43
21.43
21.43
21.43

3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22
3.22

128.734
130.142
93.162
177.109
351.954
156.913
187.421
221.803
180.968
12.013
172
155.839
224.948
168.292
161.737
9.149
36.266
54.59
102.082
92.53
100.37
85.93
68.82
12.84
35.28
106.97
78.12
10
21.13
2.92
1
43
70.54
12.85

G1 =
3467

44.976
56.401
40.811
52.803
114.051
55.984
78.122
84.786
65.869
7.055
23
47.976
74.858
61.179
44.344
6.237
16.409
15.63
33.244
29.46
32.71
25.38
19.26
3.3
10.34
30.6
21.8
1.7
5.38
2.13
1.2
12.9
20.43
3.3

Q=
1144

42.099
59.156
37.737
66.107
51.481
45.184
62.325
37.588
22.238
1.752
0
48.739
13.482
58.71
29.228
2.94
14.678
30.5
40.195
36.41
38.137
36.29
34.4
10.89
25.5
47.11
59.7
16.7
2.4
1.7
6.5
41.59
48.9
10.9

G2 =
1081

G1 + G2 =G
Q=

4549 tonnes
1144 tonnes

G+Q =

5692 tonnes

CALCUL D'UNE LONGRINE DE REDRESSEMENT POUR UNE SEMELLE EXCENTREE


a
c

P1

P2
L

b0

a'

b'

DONNEES
semelles exc,
G1 =

0.36435 MN

Q1 =

0.049934
delta G1 =
0
P.propre semelle
0.0108
semelles cent,
G2 =
0.5481553
Q2 =
0.09546
delta G2 =

L=
c=

4.87 m
0 m

MN

a=

0.5 m

MN
MN

a' =

1.85 m

b=
b' =

0.5 m
2.9 m

fe =
fc28 =

400 Mpa

MN
MN

0.004 MN

Second ct de la semelle excentre

20 Mpa

1/ Recherche des diagrammes des moments et efforts tranchants


Condition de rigidit de la longrine
H=
On vrifie si H/L/10
b0 =
OUI
0.675 m
P1u = 1,35G1+1,5Q1

a'/2+0,35*a = 1.1
0.5667735

0.8 m
0.2 m
2e>a'/2+0,35*a : forte excentricit
P1 ser=G1+Q1=
0.414284

R = P1L/(L-e)

0.65797067

0.65797067

Vu = P1+ 1,35*Poids Propre Semelle excentre

E = R-P1 = P1e/(L-e)

0.09119717

0.09119717

Mu =

V1 = R(a+c)/a' - P1

-0.38894359 -0.38894359

V2 = R-P1 = E

0.09119717

0.09119717

x0 = a'P1/R

1.59358316

1.59358316

M0 = P1e(1-a'/(2L))

-0.30990698 -0.30990698

2/ Verification de la contrainte maxi sur le sol


sous ponderation ELU
p = Pser/S

0.12420278 Mpa
p<qs Par consquent CONTRAINTE ADMISSIBLE DU SOL NON DEPASSEE

qs=

0.15 Mpa

3/ Verification du non soulevement de la semelle centrale


P2 = 0,9*G2

0.49333977 MN

P1 = G1 + 1,5Q1
E = R-P1
E<P2

0.439251 MN
0.070678051 MN
PAS DE RISQUE DE SOULEVEMENT DE LA SEMELLE CENTREE

4/ Verification des armatures de la semelle excentre


Hauteur de la semelle
0.75
d=
0.7 m
d >(a'-a)/4 =
0.6 m
A = R(a'-a)/(8*d*ss)

4.560

5/ Verification longrine de redressement


a- Armatures longitudinales
Mu =
b0 =
As =
Moment rduit

-0.309906978 MN
0.2 m
13.200 cm2
0.263741641

cm2

Longrines de redressement
Nser

longueur l (m)

long. De Redres.: ep. bo


sem. Excent.

A
Rep.
LR1
LR2
LR3
LR4
LR5
LR6
LR7
LR8
LR9
LR10

Nser

a (m)
36
38
24
22
17.16
43
9
23
40
50

fc28 (t/m)
V1
th u
-29.26829268
-30.83333333
-19.88571429
-16.97142857
-13.62610439
-34.95671498
-6.601321586
-16.1
-32.46467818
-42.039801

A (m)
0.2
0.2
0.15
0.2
0.15
0.2
0.15
0.2
0.2
0.2

4.6
4.3
3.4
2.2
3.63
3.63
3.63
1.8
3
4

d
-0.450281426
-0.474358974
-0.407912088
-0.261098901
-0.279509834
-0.537795615
-0.101558794
-0.247692308
-0.499456587
-0.646766169

h1
0.500312695
0.527065527
0.453235653
0.29010989
0.310566482
0.597550683
0.112843104
0.275213675
0.554951764
0.718629077

R(T)
40.3902439
43
27.42857143
27.65714286
18.84744327
50.2705314
9.594713656
27.6
48.97959184
59.70149254

V1(T)
-29.26829268
-30.83333333
-19.88571429
-16.97142857
-13.62610439
-34.95671498
-6.601321586
-16.1
-32.46467818
-42.039801

2500 t/m
bo

325
325
325
325
325
325
325
325
325
325

l(m)
1.2
1.2
1
1.1
0.8
1.25
0.6
0.8
1.3
1.5

0.2
0.2
0.15
0.2
0.15
0.2
0.2
0.2
0.2
0.2

Section des longrines de redressement

Mo(T,m)
-15.65217391
-16.34883721
-8.7
-7.425
-4.962454545
-18.68811983
-1.857644628
-5.366666667
-17.23333333
-26.40625

Rep.
LR1
LR2
LR3
LR4
LR5
LR6
LR7
LR8
LR9
LR10

bo

h
0.2
0.25
0.2
0.2
0.15
0.15
0.2
0.2
0.2
0.2

0.62
0.63
0.53
0.43
0.4
0.67
0.22
0.36
0.65
0.79

essement

sem. Cent.

V2(T)
xo(m)
4.390243902 1.069565217
5 1.060465116
3.428571429
0.875
5.657142857
0.875
1.687443268 0.728374656
7.270531401 1.069214876
0.594713656 0.562809917
4.6 0.666666667
8.979591837 1.061666667
9.701492537
1.25625

Fbu
1416.666667
1416.666667
1416.666667
1416.666667
1416.666667
1416.666667
1416.666667
1416.666667
1416.666667
1416.666667

Mo(T,m)
soulvement E
-15.65217391
4.390243902
-16.34883721
5
-8.7
3.428571429
-7.425
5.657142857
-4.962454545
1.687443268
-18.68811983
7.270531401
-1.857644628
0.594713656
-5.366666667
4.6
-17.23333333
8.979591837
-26.40625
9.701492537

d
d
-0.297005198
-0.310224615
-0.220113852
-0.140891841
-0.125552297
-0.35461328
-0.035249424
-0.101834282
-0.327008223
-0.501067362

h2
0.55
0.56
0.47
0.38
0.36
0.6
0.19
0.32
0.58
0.71

0.62
0.63
0.53
0.43
0.4
0.67
0.22
0.36
0.65
0.79