Vous êtes sur la page 1sur 12

FOKONTANY

AMBOHITRINIMAITS
O
DISTRICT DE MANANJARY

ELÉMENTS DE PROJET
“ POPULATION RÉSILIENTE AUX CYCLONES ”
DATE 24 AVRIL 2023
GROUPE N°4 AVOTSE
DEGATS CAUSES PAR LES PRECEDENTS 1
CYCLONES

200 Kirinda house


IMPLICATION DE LA POPULATION 2
3

• CLIMAT EQUATORIAL
• ÉCONOMIE REPOSE SUR LA PRODUCTION(VANILLA, LITCHIS, CAFÉ, GIROFLE, POIVRE)
• LA POPULATION VIT AUSSI DE LA PÊCHE, DE LA PRODUCTION DU TOAKA GASY
• LE SAMBATRA SE DÉROULE TOUS LES SEPT ANS(FLUX)
• LA POPULATION EST TOUCHÉE CHAQUE ANNÉE PAR LES CYCLONES. LA
CONSTRUCTION DE 200 LOGEMENTS REPRÉSENTE PLUS QU’UN ABRIS POUR CHACUN.
• LA POPULATION EST AU NOMBRE DE 1850 HABITANTS
4

SOMMAIRE
• AXES DE RECHERCHES
• PLANS
• ORGANIGRAMME DU PROJET(OBS)
• PLANNING
• ESTIMATIFS COÛTS
• CONCLUSION
5

PLAN DE MASSE
6

PLAN
7

AXONOMETRIE
ORGANIGRAMME
8
9

PLANNING
ESTIMATIF COÛTS
10

TABLEAU RECAPITULATIF DES 200 BUDGET ESTIMATIF DE


LOGEMENTS TOUT LE PROJET

N° DESIGNATION Mo nta nt [Aria ry]


I Tra v a ux p ré p a ra to ire 1,890,912.03 prix de 200 logement 6,663,777,985.91
II Te rra sse me nt 368,009.44
III O uv ra g e e n infra struc ture s 4,259,466.66 frais de planification 1% 66,637,779.86
IV O uv ra g e e n sup e rstruc ture s 16,418,295.85
V To iture e n Fa la fa 1,200,000.00
VI M e nuise rie BO IS 1,209,144.49
VII
VIII
Ele c tric ité e t so urc e a uto no me ( p a nne a u so la ire )
Eq uip e me nt sa nita ire
1,634,913.14
435,000.00
6,730,415,764
1 Ad d uc tio n d 'e a u p o ta b le 50,000,000.00
2 Ame na g e me nt e xte rie urs
To ta l ho rs ta xe
20,000,000.00
5,553,148,321.60
Ariary
TVA 20% 1,110,629,664.32
To ta l TTC 6,663,777,985.91
CONCLUSION

MERCI POUR VOTRE ATTENTION …

Vous aimerez peut-être aussi