Académique Documents
Professionnel Documents
Culture Documents
Communaut Economique
Des Etats de lAfrique de lOuest
Septembre 2011
TRACTEBEL ENGINEERING
Avenue Ariane, 7 1200 Brussels - BELGIUM
tel. +32 2 773 99 11 - fax +32 2 773 99 00
engineering@gdfsuez.com
www.tractebel-engineering-gdfsuez.com
TECHNICAL NOTE
Our ref.:
MP-WAPP/4NT/0217512/000/01
TS:
E18B
Imputation:
P.001957/0004
Client :
Project :
Subject :
01
11/09/01
FIN
*L. Charlier
*Y. Bouffioulx
*C. Delhaute
REV.
YY/MM/DD
STAT.
WRITTEN
VERIFIED
APPROVED
TRACTEBEL ENGINEERING S.A. Registered Office: Avenue Ariane 7 1200 Brussels - BELGIUM
VAT:BE 0412 639 681 RPM/RPR Brussels: 0412 639 681 Bank account - IBAN: BE74375100843707 BIC/SWIFT: BBRUBEBB
VALIDATED
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Comments:
1.2.
2. ASPECTS METHODOLOGIQUES........................................................................................ 9
2.1.
2.2.
2.1.2.
Mthodologie .............................................................................................. 15
2.2.1.
2.2.2.
2.2.3.
2.2.4.
Donnes ...................................................................................................... 22
3.1.1.
3.1.2.
Combustibles ..........................................................................................22
3.1.3.
3.1.4.
Donnes de gnration............................................................................44
3.1.5.
Sngal ..................................................................................................72
4.1.2.
Gambie...................................................................................................73
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
1. INTRODUCTION ............................................................................................................. 6
4.1.3.
4.1.4.
Guine ...................................................................................................75
4.1.5.
4.1.6.
Libria ....................................................................................................77
4.1.7.
Mali ........................................................................................................78
4.1.8.
4.1.9.
Ghana ....................................................................................................82
4.3.
4.2.2.
4.3.2.
4.4.
Projets nationaux......................................................................................103
4.5.
5.2.
5.3.
5.4.
5.5.
5.4.1.
5.4.2.
5.4.3.
5.4.4.
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
4.2.
8.2.
Charges .....................................................................................................135
8.3.
Shunts .......................................................................................................137
8.4.
Ligne .........................................................................................................139
8.5.
Couplages..................................................................................................149
8.6.
Transformateurs .......................................................................................149
9.2.
Convertisseurs ..........................................................................................167
9.3.
SVC ............................................................................................................167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
9.1.
1.
INTRODUCTION
Le prsent rapport constitue le Tome 1 du Rapport Final Provisoire de
LActualisation du Plan Directeur Rvis des moyens de production et de transport
dnergie lectrique de la CEDEAO.
Le Rapport Final Provisoire se compose des parties suivantes :
Donnes de ltude
Tome 2:
Tome 3 :
Tome 4 :
Synthse du rapport
Les pays de la zone A (Nigeria, Niger, Bnin, Togo, Burkina Faso, Ghana, et
cte dIvoire) sont dj relis par des interconnexions.
Parmi les pays de la zone B (Mali, Libria, Guine, Sierra Leone, Guine Bissau,
Sngal et Gambie) seuls le Sngal et le Mali sont dj interconnects.
6/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
1.1.
Tome 1:
Les carts importants relevs entre les projets du dernier plan directeur et le
dveloppement effectif des systmes lectriques, ont mis en vidence lopportunit
dune mise jour urgente du plan directeur de lEEEOA.
La prsente tude a ainsi pour but de mettre jour le plan rgional de production et
de transport lattention du Secrtariat Gnral de lEEEOA et de lensemble des
secteurs lectriques des tats membres.
Lobjectif de ltude est, tant donn le contexte, de permettre aux diffrents acteurs
du secteur de llectricits davoir une vision claire, globale et cohrente sur le
dveloppement futur des infrastructures de production et de transport dlectricit
dans la rgion et une base rationnelle de prise de dcision pour leur mise en uvre.
Cette mise jour du plan directeur vise intgrer les dveloppements en cours dans
une stratgie dexpansion moyen et long termes des infrastructures rgionales de
production et de transport, demeurant toujours cohrente avec la vision de lEEEOA.
Les diffrentes actions entreprendre au cours de lactualisation du plan directeur
portent sur les points suivants :
7/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Cette situation a men les pays membres de lEEEOA sengager dans des
programmes durgence de dveloppement de capacit de production, souvent
ambitieux, mais souvent diffrents de ceux prvus dans le plan directeur de 2004.
On peut citer en particulier le Plan dUrgence et de Scurit et dApprovisionnement
en Energie (PUSAE) de lEEEOA tabli en 2007. Ce plan vise appliquer des
solutions denvergure rgionale pour pallier la situation dinsuffisance svre des
moyens de production et de transport dlectricit.
1.2.
8/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
2.
ASPECTS METHODOLOGIQUES
Avant de dcrire plus en dtails cette mthodologie, il convient de dfinir des
critres et standards dfinir dans la planification des systmes.
2.1.
Les lignes directrices reprises dans ce document seront en outre compltes par des
rgles suivies en Europe (ENTSO-E ex UCTE) et dans les pays africains. Les
standards utiliss en Europe ne peuvent pas, du moins dans les premires annes,
tre appliqus dans les pays de lEEEOA compte tenu des caractristiques des
rseaux et des dficits dquipement actuels importants dans le rfrentiel rgional.
Il faut donc considrer un phasage pour combler progressivement ces dficits.
2.1.1.
9/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
En exploitation normale, la tension des rseaux 330 kV, 225 kV, 161 kV et 132 kV
du systme de transport aux frontires demeurera dans les limites de plus ou moins
5% de la valeur nominale. Les tensions maximales et minimale sont de +10% et
-10% (mais seulement pendant 15 minutes au maximum au-del de plus ou moins
5%).
V nominale
330
225
161
132
kV
kV
kV
kV
V exploit
normale
+- 5%
Vmin
Vmax
-10%
+10%
315-345
214-236
153-169
126-138
300
200
145
120
360
245
175
145
2.1.2.
2.1.2.1.
5%
10%
49.8 50.2 Hz
49.5 50.5 Hz
La rserve secondaire doit agir dans les 20 minutes et est gale la puissance de la
plus grosse machine en ligne dans la zone de rglage considre.
10/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Les transits dnergie ractive sur les interconnexions sont maintenus un niveau
minimum et si possible pas au-del de la puissance naturelle, dans le but de limiter
les chutes de tension et dallouer la capacit de transfert lnergie active.
Les taux de pannes non prvues qui affectent les groupes de production ;
Les indisponibilits prvues des units dues la maintenance ;
Les rductions de puissances des gnrateurs thermiques dues une lvation de
temprature ;
Le manque deau dans les rservoirs des centrales hydrolectriques.
Il est ncessaire que le systme de production dispose tout moment dun excdent
de capacit en rserve pour pallier les diffrents types de pannes qui peuvent
survenir.
La planification du dveloppement du parc de production ncessite de prendre en
considration des critres de scurit qui garantissent long terme un taux de
rserve suffisant en puissance installe.
MP-WAPP/4NT/0217512/000/01 Ed. 2011/09/01
11/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Lignes :
Notons que la taille unitaire des groupes peut avoir un impact non seulement sur
lnergie en dfaillance du systme mais galement sur la stabilit de celui-ci. De ce
point de vue il est gnralement admis que la taille unitaire du plus gros groupe ne
puisse dpasser 8 10% de la demande totale appele.
Les systmes de production sont gnralement planifis en simposant un taux de
rserve minimal ou une dure de dfaillance maximale donne. Le cot de lnergie
en dfaillance (cost of unserved Energy CUE) du systme est une consquence de ce
choix.
Inversment, le choix dun cot dnergie en dfaillance donn conduit long terme
un volume correspondant dinvestissements et un niveau correspondant de
scurit :
Si le cot de lnergie en dfaillance CUE est lev, cela cre un fort incitant
pour investir en production tout en rduisant lnergie en dfaillance END (ce qui
est gnralement le cas dans les rgions industrialises, les centres urbains, ).
Si le cot de lnergie en dfaillance est faible, le systme peut accepter une
scurit moindre cad une dure en dfaillance LOLP plus leve (ce qui est
typiquement le cas de rgions peu industrialises, de rgions rurales,).
On peut citer les approches suivantes pour estimer le cot de la dfaillance :
12/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
CUE ($/MWh)
7000
6000
5000
4000
3000
2000
1000
0
0
50
100
150
200
250
300
LOLP (h/y)
13/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
A titre dexemple, si on applique le cot explicite de lnergie non desservie cit ciavant au Ghana sur la base du PIB national et de la consommation totale dnergie
en 2010, on obtient un cot de la dfaillance de 2600 USD/MWh, qui correspond
la Figure 1 une dure en dfaillance LOLP denviron 45 heures/an. En limitant le
calcul au PIB du secteur industriel, on obtient un cot de la dfaillance de 1300
USD/MWh, qui correspond la Figure 1 une dure en dfaillance LOLP denviron
75 heures/an.
Il nest pas ais de dfinir un cot de la dfaillance car il varie fortement en fonction
des catgories de consommateurs (rsidentiels, industriels, ) , des applications de
llectricit, du degr et des caractristiques dinterruptions (jour, nuit, dure de
linterruption). De plus, les caractristiques des pays membres de lEEEOA varient
fortement dun pays lautre.
La Table 2 ci-aprs illustre la diversit des valeurs retenues pour le cot de lnergie
non desservie dans diffrents pays africains et asiatiques.
Source
South Africa
Gabon
Burkina Faso
Senegal
Sri Lanka
Cameroon
Libye
Ghana
ECOWAS
Andhra Pradesh
Guine
Eskom
Etude
Etude
Senelec
Etude
Contrat
Etude
Plan Directeur
Purdue study
Etude
EDG
19
1200
1000
1000
1.5
700
1
0.15
0.14
0.12
0.087
Monnaie USD/MWh
Rand
FCFA
FCFA
FCFA
USD
FCFA
USD
USD
USD
USD
USD
2780
2110
1820
1820
1500
1230
1000
150
140
120
90
Table 2 Cot de lnergie non desservie dans diffrents pays (Source : West Africa Regional Transmission Study
Vol. 2 : Master Plan)
Dans les pays europens et les pays arabes du Golfe, une dure en dfaillance LOLP
de lordre de 24h/an soit 0.27% est souvent prise en considration.
Il est de bonne pratique, dans les pays en dveloppement, de considrer une dure
maximum de dfaillance LOLP de lordre de 1% du temps. En Inde par exemple, on
utilise un critre de dure en dfaillance (LOLP) de 1% et un critre dnergie en
dfaillance (END) de 0.15%.
Cependant, actuellement lensemble des parcs de production des pays de lEEEOA
sont fortement sous-quips ce qui entrane des coupures dlectricit frquentes. Il
sensuit que les dures et les nergies en dfaillance sont en ralit beaucoup plus
leves.
14/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Valeur
par kWh
Country
Si lon considre par exemple les cas du Ghana dont le sous-quipement est
actuellement moindre que celui des pays voisins, le taux de rserve en puissance
effectivement disponible (infrieure la puissance installe) est de lordre de 20%..
Pour ce taux de rserve, la dure en dfaillance LOLP calcule (en exploitation
isole) reste leve et est trs sensible aux conditions hydrologiques : 7h/an en anne
humide et 200 h/an en anne moyenne. Dans les conditions actuelles, il serait donc
logique de proposer pour ce pays un objectif long terme de LOLP denviron
100heures/an qui correspond un taux de rserve en puissance disponible suprieur
au taux actuel de 20%.
De faon gnrale, dans le contexte des pays de lEEEOA qui vient dtre dcrit, il
semble donc judicieux davoir en moyenne pour objectif une dure en dfaillance de
lordre de 100 heures/an (1.14%) correspondant un cot de lnergie non desservie
de lordre de 1000 1500 USD/MWh.
Compte tenu de la situation actuelle des pays de lEEEOA, il est propos dans la
prsente tude :
2.2.
Mthodologie
La mthodologie propose pour ltude comporte les phases suivantes :
Phase 1 :
Aprs une collecte de donnes mene dans lensemble des pays membres, le
consultant proposera un inventaire complet et dtaill des moyens de production, des
rseaux de transport et de la demande dlectricit composant le bilan offre/demande
des 14 pays membres pour les 15 ans venir. Cet inventaire a pour but davoir une
vision claire de la situation nergtique de chaque pays et de situer dans les plans de
dveloppement nationaux la place des projets rgionaux de lEEEOA.
Ce rapport fera lobjet dun atelier de prsentation avec les reprsentants des pays
membres.
Phase 2 :
Ensuite, sur base cet inventaire, le plan optimal de production/transport sera
dtermin. Les objectifs poursuivis sont les suivants :
trouver loptimum combin entre le dveloppement de parc de production
lchelle de la rgion et le dveloppement du rseau de transport intra-rgional
tout en assurant la demande au cot minimum ;
identifier les projets rgionaux de transport et de production dvelopper en
priorit.
15/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Phase 3 :
La troisime phase de la mthodologie consiste en la simulation et lvaluation des
performances systmiques du rseau interconnect. Il sera vrifi que les critres de
planification et dexploitation des rseaux de transport sont respects. Des
simulations statiques et dynamiques seront effectues laide du logiciel
EUROSTAG. Le plan optimal de production/transport sera revu pour tenir compte
de limpact de ces contraintes techniques.
Phase 4 :
La quatrime phase de la mthodologie consiste dfinir un programme prioritaire
dinvestissement pour les annes venir. Ce classement seffectuera sur base des
analyses conomique et technique prcdentes, de lvaluation prliminaire
environnementale et en concertation avec lEEEOA.
Phase 5 :
Enfin, la dernire phase consiste revoir le programme dinvestissement prioritaire
en prenant en compte le contexte financier et institutionnel de la rgion et laborer
la stratgie de mise en uvre des projets.
Les diffrentes phases de cette mthodologie sont dcrites plus en dtails ci-aprs.
2.2.1.
16/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
17/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
2.2.2.
18/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Pour calculer cet optimum conomique on utilisera un modle combin des parcs de
production et des principaux axes de transport (modle PRELE). Ce modle permet
doptimiser lexploitation et les dcisions dinvestissement du systme lectrique de
lEEEOA sur la priode 2010 2025 en tenant compte des diverses contraintes de ce
systme. Ces contraintes concernent la demande, les nergies primaires disponibles
(annes sches, annes humides, disponibilit de gaz naturel), des contraintes
dexploitation, etc.
Projet
CLSG
OMVG
Corridor NORD
HUB
INTRAZONAL
OMVS
Dorsale Mdiane
Guine
Table 3 Projets rgionaux dinterconnexion en commenant ltude conomique ( lexclusion des projets prioritaires
supplmentaires dduits de ltude conomique)
2.2.3.
19/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Dorsale 330kV
2.2.3.1.
2.2.3.2.
ANALYSE ENVIRONNEMENTALE
Lanalyse environnementale a pour objectifs :
De faire une valuation prliminaire des principaux impacts des infrastructures
de production et de transport sur lenvironnement ;
De proposer des solutions pour limiter les impacts ngatifs dtects ;
Didentifier le cas chant les mesures de compensation proposer pour les
impacts ngatifs dont lattnuation nest pas possible.
La mthodologie gnrale propose pour analyser les impacts sur lenvironnement
est base sur llaboration de matrices.
Une mthodologie spcifique sera applique chaque projet prioritaire et
comprendra 4 parties:
2.2.4.
Dans une premire approche, chaque pays finance, possde et exploite la partie
des infrastructures qui est sur son territoire. Exemples : les interconnexions
Nigeria-Niger, Ghana-Togo-Bnin et Ghana-Cte dIvoire de la dorsale ctire.
Dans la seconde approche, une entit rgionale distincte (Socit But Unique SPC) dveloppe, possde et exploite les ouvrages, permettant une collaboration
rgionale. Exemple : lOMVS entre le Sngal, le Mali et la Mauritanie.
La mthodologie applique tiendra compte de la dcision dadopter les concepts de
Socit But Unique (SPC) et de Partenariat Public- Priv (PPP).
20/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Des visites sur le terrain de pays qui ont des projets transfrontaliers,
La revue des dcisions et actes complmentaires adopts par lEEEOA et la
CEDEAO,
La revue du cadre juridique et institutionnel, des politiques tarifaires et de la
situation financire des compagnies dlectricit,
Etc.
21/167
3.
3.1.
Donnes
Ce chapitre dcrit les donnes utilises dans le cadre de ltude conomique. Ces
donnes concernent les combustibles (cot et disponibilit), la prvision de la
demande et les projets de production et de transport
3.1.1.
Donnes gnrales
Le taux dactualisation de base propos est de 10%.
Les taux de change considrs dans ltude sont de :
1 =1.35 US$
1=650FCFA
Combustibles
Actuellement en Afrique de lOuest, une large varit de combustibles sont utiliss
savoir, le diesel (DDO), le ptrole brut lger (LCO), le fuel lourd (HFO), le gaz
naturel (GN) et dans une moindre mesure le charbon. Parmi les units planifies, en
dehors des units hydrolectriques, la majorit dentre elles utiliseront le GN pour
les pays de la Zone A et le HFO ou DDO pour les pays de la zone B. Plusieurs
tudes proposent galement lutilisation de charbon.
Le gaz naturel utilis par les pays de la Zone A provient soit de ressources locales
soit de gaz import par le gazoduc dAfrique de lOuest (GAO). Les combustibles
liquides proviennent en grande partie du Nigria.
Dans un souci de diversification de mix nergtique, de rduction de dpendance au
combustible liquide et de rduction du cot de combustible, d'autres combustibles
seront considrs pour la production d'lectricit dans le cadre du plan directeur,
notamment le charbon.
3.1.2.1.
22/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
3.1.2.
Dans cette tude, une grande attention est porte la diffrence des prix entre les
combustibles en relatif et non leur niveau absolu. Pour cette raison, le prix du
ptrole brut est considr constant durant toute l'tude.
Toutefois, plusieurs scnarios sont tudis en fonction du prix de rfrence du
ptrole brut. En effet, le prix du ptrole brut a t extrmement volatile ces dernires
annes avec une forte augmentation jusqu'en aot 2008, puis une forte diminution
jusqu' la fin de 2008, suivie par un faible taux de rcupration. Rcemment, les
vnements dans le monde arabe et au Japon ont provoqu une augmentation
importante et rapide des prix du ptrole. Comme il est impossible de tirer une
tendance long terme sur laquelle tous les experts s'accordent, diffrents prix du
ptrole brut sont tudis:
Les prix des combustibles aux frontires dun pays exportateur sont estims sur base
dune tude de corrlation. Il faut donc y rajouter les prix de transport maritime pour
avoir le rendu ctier et les prix de transport terrestre pour le rendu intrieur du
continent.
Les prix de transport sont estims sur base de lexprience du consultant et des
publications de lIEA de la faon suivante :
23/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
OPEP
[USD/bbl]
75
100
125
OPEP
[USD/bbl]
75
100
125
3.1.2.2.
24/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Standard - Regular
Foundation
MMSCFD
350
300
250
200
150
100
50
0
25/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
MMSCFD
500
450
Togo
400
Benin
350
Ghana
300
250
200
150
100
50
0
Une autre source de gaz considre dans le plan directeur correspond aux rserves
indignes des pays producteurs. Le Nigria, la Cte dIvoire et le Ghana disposent
de rserve off-shore. Le Sngal dispose de faibles rserves on shore.
Le Nigria est de loin le pays qui dispose des plus grandes rserves de gaz en
Afrique de louest. La figure ci-dessous reprend les prvisions de production de gaz
et la rpartition du gaz par usage.
26/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Gaz indigne
Mmscfd
300
250
200
150
100
50
0
2012
2014
2016
2018
2020
2022
2024
2026
2028
Pour 2011, les capacits de production de gaz en Cte dIvoire sont values
205 Mpc/j. Trois champs ptroliers fournissent cette production savoir : CNR (40
Mpc/j), FOCTROT (130 Mpc/j) et AFREN (35 Mpc/j). Par ailleurs, les restitutions
du sminaire Mines et Energie organis Yamoussoukro les 10 et 11 juin 2011 font
tat de 750 Milliards de pc de rserve rsiduelle de gaz et de 1500 Milliards de pc de
rserve prouve en Cte d'Ivoire
De manire conservative, le consultant a suppos quune quantit de 1000 milliards
de pc pourrait tre consomme par la Cte dIvoire lhorizon de ltude, dont 90%
par la production lectrique. Cette estimation prend en compte la ncessit
dinvestir dans laccroissement de la capacit de production de gaz, ce qui pourrait
tre un frein lapprovisionnement en gaz naturel de la Cte dIvoire
Les quantits de gaz produites au Sngal sont aujourdhui relativement marginales
et resteront marginales dans les annes venir.
LNG
Certains pays tel que le Ghana envisagent terme un approvisionnement en LNG
dans leur mix nergtique.
Aucune limitation ne sapplique aux quantits de LNG disponibles pour le march
africain, la limitation principale est la non-existence dinfrastructures de
regazification de LNG. Il existe donc un cot dentre important pour permettre un
approvisionnement en LNG.
27/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
2010
Non appropries
pour le CSP
Acceptable
Bon
Excellent
Figure 6 DNI et la latitude de la rgion d'intrt (www.dlr.de)
28/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Ressources oliennes - Potentiel olien des meilleurs sites identitfis (cf cartes)
Production
(MWh/an/MW)
Senegal
2588
Gambie
2588
Guine-Bissau
1717
Guine(Conakri)
4051
Sierra Leone
trop faible
Libria
trop faible
Mali
7.2
3531
Cte dIvoire
4.8
1565
2588
Burkina Faso
6.5
2999
Togo
5.8
2451
Bnin
6.5
3006
Nigria
7.8
3933
4051
Ghana
Niger
Commentaires
3.1.3.
Prvision de la demande
La premire partie de ltude de prvision de la demande consiste estimer, en
collaboration avec les socits dlectricit locales, la demande desservie et non
desservie. Cette estimation se fait sur base de donnes historiques de charges, de
statistiques de dlestage et de temps moyen dalimentation des charges.
La seconde partie consiste analyser des prvisions de la demande, court et moyen
terme, labores par les socits dlectricit de chaque pays et/ou des scnarios
tablis par des consultants indpendants lors dtudes antrieures
La troisime partie de la prvision de la demande consiste, sur base de paramtres
macro-conomiques (GDP, Population) et de programmes existant de rsorption de
la demande non desservie, dtablir trois scnarios encadrant lvolution probable de
la demande de chaque pays. Cette phase se base sur une prvision causale de la
demande dlectricit tablissant des corrlations entre les historiques de demande
dlectricit et dindicateurs macro-conomiques. Deux approches complmentaires
sont considres: lapproche globale et lapproche semi-globale. Lapproche globale
analyse les corrlations entre la demande nationale dun pays et des paramtres
macro-conomiques globaux (GDP, population, taux dlectrification) tandis que
lapproche semi-globale dcompose la demande en secteurs dactivit et/ou zones
gographiques.
Par ailleurs, la charge estime dans les diffrents scnarios et pour les diffrents
pays est la charge du systme complet incluant les consommations des auxiliaires et
les pertes.
29/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Vitesse de vent
moyenne (m/s)
Pays
Enfin, la prvision de la demande est ralise en considrant les deux aspects que
sont :
laccroissement de la charge du rseau interconnect existant (tude de
corrlation) ;
le raccordement de centres isols et llectrification rurale (cfr tude SNC
Lavalin).
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Scnario de base
[GWh]
Scnario bas
[GWh]
Scnario de
base
[MW]
Scnario bas
[MW]
2654
2991
3147
3319
3744
4311
4536
4774
5026
5306
5624
5933
6261
6611
6983
2561
2845
2966
3098
3428
3879
4050
4229
4417
4623
4853
5074
5306
5549
5806
456
510
532
557
629
724
761
801
844
891
944
996
1051
1110
1172
440
485
502
520
575
651
680
710
741
776
815
852
891
932
975
TABLE 9 Prvision de la consommation du rseau interconnect au Sngal en accord avec ltude SNC Lavalin de 2010
30/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Gambie
La croissance de population en Gambie est value par le Fonds Montaire
International 2.6% par an. On estime la population de la Gambie 1.7 millions en
2011.
Entre 2000 et 2005, la croissance du PIB de la Gambie variait beaucoup dannes en
annes (entre -3% et +7% de croissance annuelle selon le Fonds Montaire
International). Depuis 2006, la croissance du PIB sest stabilise autour de 5.4%,
croissance qui est estime constante pour le futur par ce Fonds.
En Gambie, la croissance de la demande est limite par la disponibilit de loffre.
Pour cette raison, il est difficile dtablir une corrlation entre la croissance de
paramtres socio-conomiques et la croissance de la demande.
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Scnario de base
[GWh]
Scnario bas
[GWh]
Scnario de base
[MW]
Scnario bas
[MW]
239
337
414
496
586
747
771
796
821
847
879
912
945
980
1 017
219
268
317
385
414
455
496
609
658
703
722
742
763
784
806
50
61
70
79
94
119
123
127
131
135
141
146
151
157
163
46
49
54
62
66
73
79
97
105
112
115
119
122
125
129
Guine Bissau
La croissance de population en Guine Bissau est value par le Fonds Montaire
International 2.4% par an ces dix dernires annes et est prvue 2.9% par an pour
les annes venir. On estime la population de la Guine Bissau 1.7 millions en
2011.
Depuis 2001, la croissance annuelle du PIB en Guine Bissau a avoisin 3%
lexception de lanne 2003 o lon a observ une croissance ngative selon le FMI.
Cette croissance devrait se poursuivre dans le futur.
Nanmoins, la croissance de la demande est limite par la dgradation de la qualit
de service. Pour cette raison, il est difficile dtablir une corrlation entre la
croissance de paramtres socio-conomiques et la croissance de la demande.
31/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Scenario de base
[GWh]
Scenario bas
[GWh]
141
149
157
167
176
187
233
281
332
385
441
465
491
517
545
141
147
153
160
167
174
182
221
263
306
352
399
418
438
458
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Mines
[GWh]
Scenario de base
[MW]
Scenario
bas [MW]
Mines
[MW]
351
351
351
351
701
701
701
701
701
701
29
32
34
36
38
40
50
60
71
83
95
100
106
111
117
29
31
32
33
35
36
38
46
54
64
73
83
87
91
95
50
50
50
50
100
100
100
100
100
100
Guine
Entre 2000 et 2010 le taux de croissance annuel de la population en Guine na pas
cess daugmenter. Ce taux a t estim par le Fonds Montaire International 1.9%
par an au dbut des annes 2000 et 2.5% en 2010. On estime aujourdhui la
population Guinenne 10.6 millions.
Le PIB de la Guine ( prix constant) a cr en moyenne de 2.95% par an sur ces 10
dernires annes selon le Fonds Montaire International.
Nanmoins, la croissance de la demande est limite par la dgradation de la qualit
de service. Pour cette raison, il est difficile dtablir une corrlation entre la
croissance de paramtres socio-conomiques et la croissance de la demande.
La prvision de la demande en Guine est donc tablie en prenant en compte les
diffrents aspects que sont
32/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Le secteur minier.
Scenario de base
[GWh]
Scnario bas
[GWh]
2011
2012
2013
2014
2015
2016
608
760
934
1102
1563
1718
608
687
760
934
1131
1406
2017
1766
1622
2018
1819
1666
2019
1875
1712
2020
1937
1763
2021
2032
1842
2022
2101
1899
2023
2170
1955
2024
2238
2012
2025
2308
2067
Mines
[GWh]
Scnario de base
[GWh]
Scnario bas
[GWh]
2643
139
164
190
221
287
302
139
148
155
181
216
247
2682
311
286
2723
321
293
330
302
4936
340
309
5011
357
324
369
334
5162
381
343
5239
393
353
405
363
4864
5086
5318
Mines
377
383
389
694
704
715
726
737
748
759
33/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sierra Leone
Scnario de base
[GWh]
Scnario bas
[GWh]
Mines
[GWh]
Scnario de base
[MW]
Scnario bas
[MW]
2011
202
162
350
38
30
2012
267
214
350
50
40
363
291
631
68
54
486
389
911
91
73
110
88
134
107
118
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
587
470
911
715
572
1612
789
631
2313
148
155
124
162
130
828
663
3013
868
694
4135
907
726
5256
170
136
179
143
188
151
158
957
766
5256
1007
806
5256
1057
846
5256
198
1107
886
5256
207
166
1157
926
5256
217
173
Aujourdhui la croissance annuelle du PIB est trs importante au Libria. Elle tourne
entre 5 et 12% par an selon le FMI.
La croissance de population au Libria est estime entre 3 et 4% selon les annes par
le FMI. Il y a aujourdhui un peu moins de 4.5 millions dhabitants au Libria.
Nanmoins, trs peu de clients sont raccords au rseau dlectricit. En 2009, 1645
consommateurs taient connects 4 sous-rseaux isols. La prvision de
croissance de la charge est trs leve les premires annes. Il ne sagit pas dune
croissance naturelle de consommation mais bien dun accroissement du nombre de
clients connects au rseau. A plus long terme, llectrification rurale et
laccroissement espr des paramtres macro-conomiques sont les facteurs cls de
la croissance de la charge.
Finalement, deux types de clients doivent tre considrs :
34/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Libria
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Scnario de base
[GWh]
Scnario bas
[GWh]
Mines
[GWh]
47
105
34
57
33
163
90
226
125
131
263
180
1 183
279
226
296
263
1 840
314
275
334
288
355
301
378
316
402
332
428
349
455
367
484
387
657
1 840
1 840
1 840
1 840
1 840
1 840
1 840
1 840
1 840
Scnario de
base
[MW]
Scnario bas
[MW]
Mines
[MW]
9
20
31
43
50
53
56
60
63
68
72
77
82
87
93
6
11
17
24
34
43
50
53
54
58
60
64
67
70
74
5
20
100
180
280
280
280
280
280
280
280
280
280
280
35/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Mali
Scenario de base
[GWh]
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
1
1
1
2
2
2
2
3
3
3
3
3
3
4
4
136
232
382
111
226
896
997
153
248
398
567
740
916
097
282
Scnario bas
[GWh]
1
1
1
1
1
2
2
2
2
3
3
3
3
3
3
098
174
233
294
434
144
239
930
999
085
155
279
405
534
665
Scenario de base
[MW]
Scnario bas
[MW]
199
216
240
346
366
464
482
509
525
550
577
605
634
663
693
192
206
216
227
249
352
368
470
482
497
509
529
549
570
591
36/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Cte dIvoire
Scenario de base
[GWh]
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
6
6
6
7
7
8
8
9
9
10
10
11
11
12
13
005
390
799
245
731
197
680
182
703
244
807
391
998
628
284
Scnario bas
[GWh]
5
6
6
6
6
7
7
7
8
8
8
9
9
9
10
859
131
410
696
990
291
600
917
241
574
915
265
624
992
369
Scenario de base
[MW]
Scnario bas
[MW]
968
1 030
1 096
1 168
1 247
1 322
1 400
1 480
1 564
1 652
1 742
1 837
1 934
2 036
2 142
945
989
1 034
1 080
1 127
1 176
1 225
1 276
1 329
1 382
1 437
1 494
1 552
1 611
1 672
37/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Ghana
Scenario de base
Consommation
domestique
[GWh]
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
9 793
10 421
11 093
11 764
12 484
13 252
14 070
14 941
15 869
16 857
17 908
19 027
20 218
21 485
22 832
VALCO
[GWh]
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
314
314
971
971
971
971
971
971
971
971
971
971
971
971
971
Scnario bas
Scenario de base
Consommation
domestique
[GWh]
VALCO
9 239
9 652
10 096
10 522
10 971
11 440
11 932
12 446
12 984
13 547
14 135
14 750
15 393
16 065
16 768
657
657
1 314
1 314
1 314
1 314
1 314
1 314
1 314
1 314
1 314
1 314
1 314
1 314
1 314
[GWh]
Consommation
domestique
[MW]
1
1
1
1
1
2
2
2
2
2
2
2
3
3
3
479
573
675
780
888
007
130
262
401
550
708
877
056
247
450
VALCO
[MW]
150
150
225
225
225
225
225
225
225
225
225
225
225
225
225
Scnario bas
Consommation
domestique
[MW]
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
395
457
524
590
657
730
804
881
962
047
136
228
325
426
532
VALCO
[MW]
75
75
150
150
150
150
150
150
150
150
150
150
150
150
150
Togo-Bnin
Au Benin, la croissance du PIB a t relativement constante ces dix dernires annes
avec un taux de croissance annuel situ entre 3% et 5% selon le FMI.
La croissance de population au Benin atteignait 3.3% par an jusque 2005 et 2.8% par
an depuis 2006. On approche aujourdhui les 10 millions dhabitants au Benin.
Au Togo, la croissance du PIB a t ngative au dbut des annes 2000. Depuis
2003, le PIB crot en moyenne de 2.5% par an.
Au Togo, la croissance annuelle de population avoisine 2.5%. Il y a actuellement un
peu plus de 7 millions dhabitants au Togo selon les estimations du FMI.
Le secteur de llectricit au Togo et au Benin est rgi par lAccord international et
Code Benino-togolais de llectricit sign entre les 2 tats en 1968 et crant une
communaut dintrt entre les 2 pays dans le domaine de lnergie lectrique.
Ce code confrait la Communaut Electrique du Benin le monopole de la
production, du transport et des importations/exportations de lnergie lectrique sur
lensemble du territoire des deux tats.
Nanmoins, laccord international et Code bnino-togolais sign en 1968 a t rvis
en 2003. Ce sont donc les dispositions du nouvel accord et Code de 2003 qui sont
dsormais en vigueur. Conformment aux dispositions de ce nouvel accord et Code
bnino-togolais rvis de 2003, la CEB na plus le monopole de la production
dlectricit. Le segment de la production dlectricit est ouvert aux producteurs
indpendants mais la CEB demeure lacheteur unique de leur production partout o
leur rseau est prsent.
Pour cette raison, les donnes dnergie sont disponibles pour lensemble des deux
tats et non pour chacun indpendamment de lautre. Ltude de la demande
concerne donc la communaut Togo-Benin sur base des informations de la CEB.
38/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
39/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Au Togo :
- CEET: Compagnie Energie Electrique du Togo, socit nationale de
distribution dlectricit ;
- WACEM : West Africain Cement, producteur de ciment ;
- SNPT: Socit Nouvelle des Phosphates du Togo, producteur de phosphates.
Au Benin :
- SBEE: Socit Beninoise dEnergie Electrique, socit nationale de
distribution dlectricit ;
- SCB Lafarge: Producteur de ciment.
Les gros clients industriels reprsentent environ 15% de la demande en lectricit.
Le reste de la demande est transmise aux socits de distribution Togolaise et
Beninoise agissent en partie comme auto-producteurs tant donn quils possdent
leurs propres moyens de production. La demande de ces clients est essentiellement
rsidentielle et tertiaire.
Togo
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Bnin
Scnario
de base
[GWh]
Scenario
bas
[GWh]
Scnario
de base
[MW]
Scenario
bas
[MW]
Scnario
de base
[GWh]
Scenario
bas
[GWh]
Scnario
de base
[MW]
Scenario
bas
[MW]
1042
1294
1440
1571
1712
1873
2046
2230
2426
2609
2801
3004
3217
3442
3680
1035
1286
1405
1503
1608
1728
1856
1990
2131
2257
2387
2523
2664
2812
2965
170
211
235
256
279
305
334
364
395
426
457
490
525
561
600
169
210
229
245
262
282
303
325
348
368
389
412
435
458
484
1341
1469
1564
1697
1835
1968
2105
2248
2396
2576
2766
2967
3178
3400
3634
1333
1460
1526
1624
1723
1816
1910
2006
2105
2229
2358
2492
2632
2777
2928
219
240
255
277
299
321
343
366
391
420
451
484
518
555
593
217
238
249
265
281
296
311
327
343
364
385
407
429
453
477
40/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Burkina Faso
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Scnario de base
[GWh]
Scnario Bas
[GWh]
Scnario de base
[MW]
Scnario bas
[MW]
873
934
1 006
1 087
1 173
1 265
1 362
1 466
1 576
1 694
1 820
1 953
2 095
2 247
2 408
873
929
987
1 048
1 112
1 179
1 250
1 324
1 402
1 484
1 570
1 661
1 755
1 855
1 959
178
190
205
222
239
258
278
299
321
345
371
398
427
458
491
178
189
201
214
227
240
255
270
286
303
320
338
358
378
399
Niger
Lanalyse historique des donnes dmographiques, conomiques et des
consommations lectriques est ltape pralable aux projections de la demande.
Entre 2000 et 2010 la croissance de population au Niger a t estime par le Fonds
Montaire International 3.1% par an. On estime aujourdhui la population du Niger
15.2 millions (souce : INS-Niger).
Le PIB du Niger ( prix constant) a cr en moyenne de 4.8% par an sur ces 10
dernires annes selon le Fonds Montaire International.
Il y a 4 zones au Niger :
41/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Fleuve
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
[GWh]
429
461
494
528
535
569
604
640
677
715
754
794
835
877
921
Niger
Centre
Est
[GWh]
249
267
286
306
433
452
473
493
515
537
559
583
607
631
656
Scnario bas
Niger
Est
Nord/
Agadez
Total
Fleuve
[GWh]
62
67
72
76
132
141
149
158
167
177
187
197
207
217
228
[GWh]
109
117
125
134
136
144
153
162
172
181
191
201
212
223
234
[GWh]
849
912
977
1 044
1 235
1 306
1 379
1 454
1 530
1 609
1 691
1 774
1 860
1 948
2 039
[GWh]
422
446
470
496
494
518
544
570
596
623
651
679
707
737
767
Niger
Centre
Est
[GWh]
245
258
273
287
409
423
438
453
468
484
500
516
533
550
567
Scnario de base
Fleuve
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
[MW]
86
93
99
106
113
120
127
135
143
151
159
168
176
185
195
Niger
Centre
Est
[MW]
22
23
25
26
48
51
54
58
61
64
68
72
75
79
83
Niger
Est
Nord/
Agadez
Total
[GWh]
61
65
68
72
126
133
139
146
152
159
166
174
181
188
196
[GWh]
107
113
119
126
125
131
138
144
151
158
165
172
179
187
194
[GWh]
835
882
931
980
1 154
1 205
1 258
1 312
1 368
1 424
1 482
1 541
1 601
1 662
1 725
Niger
Est
Nord/
Agadez
Total
[MW]
3
4
4
4
4
4
5
5
5
5
6
6
6
6
7
[MW]
37
39
41
44
46
48
50
53
55
58
60
63
66
68
71
[MW]
146
154
163
172
181
190
199
208
218
228
238
248
259
270
280
Scnario bas
Niger
Est
Nord/
Agadez
Total
Fleuve
[MW]
3
4
4
4
5
5
5
5
6
6
6
7
7
7
8
[MW]
38
41
43
46
49
53
56
59
63
66
70
73
77
81
85
[MW]
149
160
171
183
215
229
243
257
272
287
303
319
336
353
370
[MW]
85
90
94
99
105
110
115
121
126
132
138
144
150
156
163
Niger
Centre
Est
[MW]
21
22
24
25
46
48
51
53
56
58
61
63
66
69
72
42/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Scnario de base
Nigria
La croissance de population au Nigria est value par le Fonds Montaire
International 2.7% par an. On estime la population nigriane 160 millions en
2011.
Depuis 2001, la croissance annuelle du PIB au Nigria a vari entre 5% et 10%
lexception de lanne 2002 o lon a observ une croissance exceptionnelle de 21%
selon le FMI.
Etant donn la quantit dnergie non desservie au Nigria, il est difficile dtablir
une tude de corrlation entre la demande et les paramtres macro-conomiques sur
les dix dernires annes.
Depuis 2006, le parc de production na pas t renforc au Nigria. La rsorption de
la demande na ds lors pas pu tre amorce. Au contraire, lnergie non desservie
na fait quaugmenter tant donn la dcroissance constante de lnergie produite
depuis 2006.
Scnario bas
[GWh]
Scnario de
base [MW]
Scnario bas
[MW]
39 102
58 069
61 321
64 964
68 830
72 926
77 258
81 856
86 717
91 873
98 732
104 604
110 821
117 412
124 393
25 524
34 570
43 624
56 272
65 178
69 058
72 339
75 784
79 383
83 159
88 365
92 569
96 969
101 584
106 415
6 376
9 471
10 000
10 595
11 225
11 892
12 599
13 348
14 142
14 983
15 874
16 818
17 818
18 877
20 000
4 162
5 638
7 114
9 177
10 629
11 261
11 797
12 358
12 946
13 562
14 207
14 883
15 591
16 333
17 110
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
43/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
3.1.4.
Donnes de gnration
3.1.4.1.
Les tailles proposes pour les cycles combins (CC) sont 60 MW, 300 MW et
450 MW. Ces tailles correspondent aux ordres de grandeurs des standards utiliss
dans certains pays de la CEDEAO comme le Sngal (50MW), le Ghana (90MW et
300 MW) et le Nigeria ou la Cte dIvoire (projet) (450 MW). Aucune taille
suprieure 450 MW na t propose pour des considrations systmiques. En
effet, un CC de 450 MW prsente un incident dimensionnant de 225 MW (1 TG et
TV) qui est consquent vu la taille des rseaux ouest africains.
Les tailles proposes pour les TG correspondent aux TG des cycles combins
proposs savoir : 45 MW, 100 MW et 150 MW.
En terme de technologie, la slection des TG et CC a t faite de faon faciliter la
maintenance et minimiser les cots dinvestissements plutt qu maximiser le
rendement. Il serait possible datteindre un ou deux points de rendement
supplmentaires mais un cot trs lev.
Pour les CC, deux mthodes de refroidissement sont proposes, le refroidissement
par arorfrigrant et par prise deau directe. La prise deau directe permet
daugmenter de un deux points le rendement global.
Le Consultant a utilis le logiciel Thermoflow pour estimer les investissements et les
cots dexploitation des diffrentes configurations. Ce logiciel simule le cycle
thermodynamique de la centrale sur base des composants de la centrale choisis. Il
renseigne ainsi de lefficacit nette attendue et donc de la consommation spcifique.
Les hypothses principales peuvent tre rsumes ci-aprs :
44/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Les combustibles modliss dans le Thermoflow sont dune part le gaz naturel et
dautre part le distillat #2. Ce distillat permet de reprsenter les performances de la
centrale brlant du diesel ou du LCO.
La table ci-dessous prsente les donnes dinvestissement des technologies TG et
CC.
45/167
Scnarios Thermoflow
Units
Mthode de refroidissement
Fabricant TG + Modle
Fabricant TG + Modle (seconde alternative)
Puissance brute TG (conditions locales)
Nombre de TG
Fabricant TV + Modle (seconde alternative)
Nombre de TV
Puissance brute TV (conditions locales)
Puissance nominale totale (brute) GN / Distillat
Puissance nominale totale (nette) GN / Distillat
Rendement net
Cot d'investissement
Cot d'investissement / kW
Echancier de paiement
(depuis signature de l'EPC ou EPCM)
dure de vie
Cot d'exploitation et maintenance - fixe
Cot d'exploitation et maintenance - variable
Combustible 1
Consommation spcifique - Combustible 1
Combustible 2
Consommation spcifique - Combustible 2
Emission CO2
Emission S02 (pour les distillats)
Emission Nox (sans SCR)
Indisponibilit planifie (maintenance)
Indisponibilit fortuite
MW
MW
MW
MW
%
MUSD
USD/kw
%/an
yearsans
USD/kW
USD/MWh
kJ/kWh
kJ/kWh
T/h
T/h
ppmV (sec)
pu
pu
2
CC (300MW)
2TG + 1TV
3
CC (450MW)
2TG+1TV
4
CC (450MW)
2TG+1TV
5
CC (60MW)
1TG+1TV
6
CC (60MW)
1TG+1TV
Arorfrigr
Arorfrigr
Arorfrigr
7
TG (45MW)
Gaz naturel
6996
Distillat #2
7039
134
0 563
15
7%
8%
Gaz naturel
7247
Distillat #2
7293
173
0.727
25/?
7%
8%
Gaz naturel
6930
Distillat#2
6970
173
0.727
25/?
7%
8%
Gaz naturel
7522
Distillat #2
7601
22
0.92
15/42
7%
8%
Gaz naturel
7169
Distillat #2
7240
29
0.92
15/42
7%
8%
Gaz naturel
11225
Distillat #2
11435
30
0.125
25/?
7%
8%
Gaz naturel
11404
Distillat #2
11620
62
0/0.263
25/42 (hum)
7%
8%
TG (100MW) TG (150MW)
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
1
CC (300MW)
2TG + 1TV
46/167
Gaz naturel
10869
Distillat #2
11014
86
0/0.362
25/?
7%
8%
Charbon
Les investissements dcids planifis et envisags au Niger et au Sngal concernent
des petites units (125MW au Sngal et 4*50 MW au Niger).
En labsence de donnes concrtes sur la technologie utilise, des donnes
dinvestissement standard ont t proposes. La slection des units a t faite de
faon faciliter la maintenance et minimiser les cots dinvestissements plutt
qu maximiser le rendement. Il serait possible datteindre un ou deux points de
rendement supplmentaires mais un cot trs lev.
De manire gnrale, deux technologies seraient envisages :
Units
Nombre de TV
Puissance brute TV (conditions locales)
Puissance nominale totale (brute)
Puissance nominale totale (nette)
Rendement net
Cot d'investissement
Cot d'investissement / kW
Echancier de paiement
(depuis signature de l'EPC ou EPCM)
dure de vie
Cot d'exploitation et maintenance - fixe
Cot d'exploitation et maintenance - variable
Combustible 1
Consommation spcifique - Combustible 1
Combustible 2
Consommation spcifique - Combustible 2
Emission CO2
Emission S02 (pour les distillats)
Emission Nox avec SCR
Indisponibilit planifie (maintenance)
Indisponibilit fortuite
MW
MW
MW
%
MUSD
USD/kw
%/an
an
USD/kW
USD/MWh
kJ/kWh
kJ/kWh
T/h
T/h
ppmV (sec)
pu
pu
Scnarios Thermoflow
10
11
Coal (125MW)
Coal (250MW)
Type: CFB
Type: PC
1
1
125
250
125
250
116
230
37.6
39
314
540
2512
2160
16/32/32/20
16/32/32/20
sur 3.3 ans
sur 3.3 ans
35
35
75
65
3.14
2.7
Coal
Coal
9574
9231
Oil, biomass
Oil, biomass
106
0,053
97 (SNCR)
7%
8%
206
0,103
96 (SNCR)
7%
8%
47/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Units
MW
%
MUSD
USD/kw
%/an
an
USD/kW
USD/MWh
kJ/kWh
kg/MWh
kg/MWh
pu
pu
HFO 10MW
10
40%
14.5
1450
50%/50%
sur 2 ans
20
16.8
7.1
HFO
9000
712.8
4.1
7%
10%
HFO 20MW
20
40%
27
1350
50%/50%
sur 2 ans
20
16.8
7.1
HFO
9000
712.8
4.1
7%
10%
DDO 10MW
10
36%
10.7
1070
50%/50%
sur 2 ans
20
8.4
10.1
DDO
10000
741
0.9
7%
10%
Biomasse
Certains pays tels que le Sngal, le Libria et le Sierra Leone envisagent la
biomasse dans leur mix nergtique
En labsence de donnes concrtes sur la technologie utilise, des donnes
dinvestissement standard ont t proposes. La slection des units a t faite de
faon faciliter la maintenance et minimiser les cots dinvestissements plutt
qu maximiser le rendement. Il serait possible datteindre un ou deux points de
rendement supplmentaires mais un cot trs lev.
La table ci-dessous prsente les donnes dinvestissement des technologies utilisant
la biomasse. Etant donn la taille des investissements proposs pour le Sngal, le
Libria et le Sierra Leone, cest la technologie CFB qui est retenue. Selon la taille
des projets, les donnes sont variables.
48/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Units
Centrale biomasse
(100MWe)
Centrale biomasse
(40MWe)
Centrale biomasse
(5MWe)
Fabricant + Modle
Nombre de TV
Puissance brute TV (conditions locales)
Puissance nominale totale (brute)
Cot d'investissement
Echancier de paiement
MW
MW
MUSD
%/an
CFB Boiler
1
40
40
136
Y0-3: 45%
Y0-2: 25%
Y0-1: 10%
Y0 : 20%
3400
30
136
inclus
Copeaux de bois
9600
0
250
125
0.07
0.08
Grate Furnace
1
5
5
34
Y0-1: 55%
Y0 : 45%
kJ/kWh
mg/Nm3
mg/Nm3
mg/Nm3
mg/Nm3
pu
pu
CFB Boiler
1
100
100
324
Y0-3: 45%
Y0-2: 25%
Y0-1: 10%
Y0 : 20%
3240
30
129.6
inclus
Copeaux de bois
9600
0
250
125
0.07
0.08
6800
30
272
inclus
Copeaux de bois
15000
0
250
125
0.07
0.08
GWh
t/an
USD/GJ
USD/GJ
745
510 000
3.6
5.1
300
204 000
3.6
5.1
37
40 000
3.6
5.1
Cot d'investissement / kW
dure de vie
Cot d'exploitation et maintenance fixe
Cot d'exploitation et maintenance variable
Combustible 1
Consommation spcifique - Combustible 1
Emission CO2
Emission S02 (pour les distillats)
Emission Nox sans SCR
Emission Nox avec SCR
Indisponibilit planifie (maintenance)
Indisponibilit fortuite
Particularits
- Energie disponible moyenne
- Consommation de copeaux
- Prix du combustible sans transport
- Prix du combustible avec transport (500km)
USD/kW
an
USD/kW/an
USD/MWh
49/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Hydrolectricit
Un des objectifs de ce plan directeur ainsi que des plans directeurs nationaux de la
plupart de pays de lAfrique de lOuest est la mise en valeur des ressources hydrolectriques non encore exploites. Ces ressources sont trs abondantes et
principalement distribues dans les bassins des fleuves Sngal, Niger, Gambie et
Konkour.
Ces projets sont pris en considration comme options dinvestissement lors de
loptimisation du plan de production et sont ainsi mis en comptition avec les autres
technologies prsentes dans ce chapitre.
Nanmoins, il est noter que les projets proposs dans les pays de la zone B ne
pourront pas raisonnablement tre tous mis sur pied lhorizon 2025 mme si
beaucoup se rvlent rentables dun point de vue conomique. En effet, les limites
financires des pays, les impacts environnementaux, et les difficults daccessibilit
sont autant de freins au dveloppement massif de lhydrolectricit. De plus, un
certain nombre de ces projets pourraient tre ddicacs lalimentation locale du
secteur minier.
50/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
NomCentrale
Statut
Capacit
Installe
Cot
total
Cot spc.
Invest.
Energie
moyenne
Burkina Faso
Bougouriba
Candidat
[MW]
[M$]
122
[M$/kW]
[GWh/an]
12
Burkina Faso
Bagre Aval
14
Cte d'Ivoire
Soubr
Cte d'Ivoire
Gribo Popoli
Candidat
Candidat
Cte d'Ivoire
Boutoubre
Cte d'Ivoire
Energie
garantie
10125
30
[GWh/an]
22.8
106
7536
36
27.36
270
620
2296
1116
848
112
364
3249
515
391
Candidat
156
401
2570
785
597
Louga
Candidat
280
1330
4751
1330
1011
Cte d'Ivoire
Tiassale
Candidat
51
207
4068
215
163
Cte d'Ivoire
Aboisso Comoe
Candidat
90
248
2756
392
298
Ghana
Juale
Candidat
87
372
4276
405
308
Ghana
Pwalugu
Candidat
48
209
4361
184
140
Ghana
Daboya
Candidat
43
241
5611
194
147
Ghana
Hemang
Candidat
93
304
3270
340
258
Ghana
Kulpawn
Candidat
36
345
9587
166
126
Guine
Amaria
Candidat
300
377
1256
1435
1057
Guine
Bonkon Diaria
Candidat
174
211
1213
451
315
Guine
Diaraguela
Candidat
72
178
2472
400
298
Guine
Fetore
Candidat
124
160
1290
322
232
Guine
Fomi
Candidat
90
156
1728
374
320
Guine
Frankonedou
Candidat
36
83
2306
173
140
Guine
Grand Kinkon
Candidat
291
298
1024
720
618
Guine
Gozoguezia
Candidat
48
110
2292
259
200
Guine
KassaB
Candidat
135
214
1585
528
467
Guine
Kaleta
Dcid
240
267
1114
946
228
Guine
Kogbedou
Candidat
14
71
5083
111
99
Guine
Kouravel
Candidat
135
185
1370
350
240
Guine
Kouya
Candidat
86
156
1814
334
315
Guine
Lafou
Candidat
98
128
1306
255
210
Guine
Morisakano
Candidat
100
260
2600
523
438
Guine
Nzebela
Candidat
48
94
1958
225
210
Guinee
Poudalde
Candidat
90
150
1667
342
319
Guine
Souapiti
Candidat
515
692
1344
2518
2403
Guine
Tiopo
Candidat
120
295
2458
590
480
Liberia
MtCoffee (+via)
Dcid
66
383
5803
435
344
Liberia
St Paul 1B
Candidat
78
244
3123
512
389
Liberia
St Paul 2
Candidat
120
375
3123
788
599
Liberia
St Paul V1
Candidat
132
412
3123
569
433
Liberia
Candidat
66
234
3546
285
216
Liberia
St Paul 1B (+V1)
Candidat
65
203
3123
280
213
Liberia
St Paul 2 (+ V1)
Candidat
100
312
3123
431
328
Liberia
Lofa River
Candidat
29
141
4861
125
95
Liberia
St John River
Candidat
67
287
4280
289
220
Libria
CestosRiver
Candidat
41
234
5707
177
480
51/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud
NomCentrale
Statut
Capacit
Installe
Cot
total
Cot spc.
Investissement
Energie
moyenne
Energie
garantie
[MW]
[M$]
[M$/kW]
[GWh]
[GWh]
Mali
Kni
Candidat
34.4
126
3671
199
163
Mali
Taoussa
Candidat
25
209
8340
108
82
Mali
Sotuba 2
Candidat
48
7943
39
37
Mali
Markala
Candidat
10
40
4025
53
40
Niger
Kandadji
Candidat
130
405
3115
629
478
Niger
Gambou
Candidat
122.5
577
4712
528
402
Niger
Dyodyonga
Candidat
26
60
2293
112
85
Nigeria
Mambilla
Candidat
2600
4000
1538
11214
8522
Nigeria
Zungeru
Candidat
700
1077
1538
3019
2295
Sierra Leone
Bumbuna II
Candidat
40
78
1950
220
237
Sierra Leone
Bumbuna III
Candidat
90
176
1950
396
317
Sierra Leone
Bumbuna IV- V
Candidat
95
185
1950
494
463
Sierra Leone
Goma II
Candidat
40
6709
31
Sierra Leone
Benkongor
Candidat
200
490
2447
1164
959
Sierra Leone
Kuse II
Candidat
91.8
235
2561
680
549
Sierra Leone
Kambatibo
Candidat
52.5
164
3120
269
212
Sierra Leone
Bitmai I
Candidat
52.5
164
3120
268
212
Sierra Leone
Bitmai II
Candidat
36.6
130
3543
250
211
Togo
Adjarala
Dcid
147
333
2265
366
237
Togo
Tttou
Candidat
50
159
3174
148
112
Benin
Ktou
Candidat
160
337
2105
490
372
Burkina /Ghana
Noumbiel
Candidat
60
286
4767
203
154
C Iv /Liberia
Tiboto
Candidat
225
578
2570
1200
912
Libria/S.L
ManoRiver
Candidat
180
473
2625
795
612
OMVG Guine
Digan
Candidat
93.3
112
1200
243
24
OMVG Guine
FelloSounga
Candidat
82
285
3474
333
286
OMVG Sngal
Sambangalou
Dcid
128
433
3386
402
208
OMVG G. Bissau
Saltinho
Candidat
20
83
4273
82
24
OMVS Guine
Balassa
Candidat
181
171
945
470
401
OMVS Guine
Boureya
Candidat
160
373
2331
717
455
OMVS Guine
Diaoya
Candidat
149
332
2228
581
389
OMVS Guine
Koukoutamba
Candidat
281
404
1438
858
507
OMVS Guine
Tene I
Candidat
76.4
122
1597
199
129
OMVS Mali
Felou
Dcid
60
170
2828
350
320
OMVS Mali
Gouina
Dcid
140
328
2343
565
227
OMVS Mali
Gourbassi
Candidat
21
91
4311
104
79
OMVS Mali
Badoumbe
Candidat
70
197
2818
410
312
OMVS Mali
Bindougou
Candidat
49.5
158
3185
289
220
OMVS Mali
Moussala
Candidat
30
114
3801
175
133
52/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud
Units
Hydro-lectrique
an
USD/MWh
%.
pu
pu
50
2
Inclus dans variable
4%
2%
Energie Solaire
Pour les technologies CSP, l'irradiation directe normale (DNI en kWh/m/y) est un
critre essentiel pour dfinir le potentiel des sites. Par consquent, dans la rgion
dintrt, 4 gammes de DNI ont t dfinies:
Non appropri < 2.000 kWh/m2/a
Acceptable
2.001 2.200 kWh/m2/a
Bon
2.201 2.600 kWh/m2/a
Excellent
>2.600 kWh/m2/a
Cette chelle est spcifique la rgion et est dfinie sur la base des donnes DNI
disponibles pour la rgion.
Un autre paramtre cl est la latitude qui influe sur les pertes de lunit. Les latitudes
considres sont de 15 , 20 et 25 .Les latitudes moins de 10 ne sont pas
considres car elles sont classes comme non appropries dans l'chelle de DNI.
30 latitude North
Non appropries
pour le CSP
10 latitude North
Acceptable
Bon
Excellent
53/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Units
MW
GWh
%/an
MUSD
USD/kW
an
USD/kW/an
USD/MWh
%
pu
pu
50
206
70% Y0-1
30% Y0
507
10138
25
254
17%
2%
-
h
kWh/m/y
m
7.5
2400
152
497000
Units
Solaire PV
MW
GWh
%/an
1
2
100% Y0
MUSD
USD/kW
an
USD/kW/an
USD/MWh
%
pu
pu
3.66
3660
20
20
15%
0.50%
0.75%
h
kWh/m/y
m
Energie olienne
Deux technologies doliennes sont proposes comme option dinvestissement pour
le plan directeur. La premire technologie correspond ltat de lart actuel en
termes doliennes. Il sagit de turbine denviron 2 MW proposes par tous les
fabricants (GE, REPower, Vestas, Gamesa, Siemens, Nordex, Enercon) Cette
technologie est actuellement la plus rpandue.
La seconde technologie propose consiste en une structure plus petite, plus flexible
qui peut plus facilement tre installe dans des rgions distantes o les oliennes
traditionnelles sont difficiles installer. Typiquement, cette technologie est propose
par la socit Vergnet.
MP-WAPP/4NT/0217512/000/01 Ed. 2011/09/01
54/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Units
MW
GWh
MUSD
%/an
USD/kW
an
USD/kW/an
USD/MWh
pu
pu
Eolienne (25x2MW)
50
100
74
70% Y0-1
30% Y0
1485
20
17
9.5
1%
4%
Eolienne (50x1MW)
50
100
88
70% Y0-1
30% Y0
1750
20
17
9.5
1%
4%
3.1.4.2.
Projets dcids:
- La centrale hydrolectrique de Flou dans le cadre de lOMVS. Cest une
centrale de 60 MW et, selon les accords avec lOMVS, le Sngal disposera
de 25% du productible. Cela assurera 15 MW supplmentaires partir de
2013 la condition que le rseau de lOMVS permette le transfert de cette
capacit supplmentaire;
- Dans le cadre de lOMVS galement, la centrale de Gouina, pour 140 MW est
prvue en 2017. La part du Sngal est de 25% soit 35 MW;
- Par lOMVG, le Sngal devrait bnficier de 40% du productible de la
centrale hydrolectrique de Sambangalou en 2017, soit 51MW;
- Une centrale au charbon sur le site de Sendou (875 MW au total) ds 2016;
- La location dune unit au diesel de 50 MW en 2011 pour une dure de un an,
avec possibilit de louer 100MW supplmentaires;
- La rhabilitation des groupes C3 et C4 de Bel Air (+30MW en 2011 et 25MW
en 2012);
55/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Projets dcids:
- La remise en service complte des units de Kotu;
- La rhabilitation de lunit G6 de Kotu en 2011;
- La rhabilitation de lunit G2 (HFO) Kotu (3 MW) en 2012;
- Linstallation de 2 nouvelles units diesel de 6.5 MW fonctionnant au HFO,
la centrale de Brikama fin 2011;
- Linstallation de 9 MW supplmentaires Brikama fonctionnant au HFO fin
2011galement;
- 4 units de 2 MW fonctionnant au HFO pour les centres isols ;
- Construction dune ferme olienne de 1 MW Tanji en 2012.
Region
Charge actuelle
Nouvelles
Units
Connexion Banjul
1.8 MW
2 MW en 2013
2013
Bansang
0.6 MW
2 MW en 2013
2014
EASSAN / Barria
0.46 MW
KEREWAN
0.22 MW
2 MW en 2013
BASSE
1.8 MW
2 MW en 2013
KANIR
0.18 MW
OMVG
2014
Projets candidats:
- Lextension de la centrale de Brikama 2 x 10 MW 2013;
- Un projet de 4MW oliens supplmentaires en 2014;
- Par lOMVG, la Gambie devrait bnficier de 12% du productible de la
centrale hydrolectrique de Sambangalou en 2017, soit 15 MW ;
- Un projet solaire de 10MW;
- Lextension du parc olien de 6 MW;
- Un cycle combin de 60MW aprs 2014;
- La seconde phase des projets de lOMVG.
56/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Guine Bissau
Projets dcids :
- 106 MW par le projet de centrale thermique de Manah fonctionnant au HFO.
La mise en service est suppose intervenir en 2014 et 2015;
- Mise en service de 100MW supplmentaires Tombo ;
- La centrale hydrolectrique au fil de leau de Kaleta qui comportera trois
units de 80 MW et produira en moyenne 946 GWh par an ds 2015 ;
- La rhabilitation des units thermiques et hydrolectriques de Guine ;
- Par lOMVG, la Guine devrait bnficier de 40% du productible de la
centrale hydrolectrique de Sambangalou en 2017, soit 51 MW.
Projets candidats :
- En plus des secondes phases des projets OMVS et OMVG, les sites repris cidessous sont galement envisags en Guine.
Le site de Souapiti prsente une puissance installable de 515 MW et est
planifi pour 2019. Il pourrait tre associ un projet de fonderie
daluminium ce qui ne laisserait pas de puissance pour dautres usages. Si
lusine daluminium nest pas construite, il servira pour lalimentation des
mines et de lexport;
Le site de Kassa B (135MW) est planifi pour 2021;
Le site de Poudald sur le fleuve Cogan prs de Tiopo est en cours dtude
de faisabilit. Il est planifi pour 2017. Sa puissance installe est de 90
MW pour un productible de 350 GWh ;
Enfin, le projet Grand-Kinkon a une capacit installe de 291 MW pour un
productible annuel de 735 GWh et un cot estimatif de 298M$.
57/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Projets dcids :
- La capacit installe en ce moment est de 5.6 MW environ. Mais la capacit
disponible en continu est de 5 MW (2.5 MW EAGB et 2.5 MW de location);
- 2 groupes de 2.5MW financs par la banque mondiale et installs en 2012.
Ds la mise en service de ces units, les contrats de location de 2.5MW seront
rompus;
- Financement de 15 MW HFO pour la ville de Bissau support par lUEMOA
et la BOAD. Prvu en plusieurs tapes de 5 MW entre 2012 et 2014;
- Rhabilitation de la centrale dEAGB Bissau (2MW);
- Rhabilitation de la centrale de Bafat (5MW);
- Mise en service de la centrale de Buba (5MW);
- Par lOMVG, la Guine Bissau devrait bnficier de 8% du productible de la
centrale hydrolectrique de Sambangalou en 2017, soit 10 MW;
- Il est par ailleurs suppos que lorsque les moyens de production deviendront
suffisants, les auto-producteurs cesseront dutiliser leurs propres moyens de
production.
Projets candidats
- Centrale HFO de 55MW.
Guine
Site
Localisation
Capacit
[MW]
Productible
annuel [GWh]
515
2518
300
1435
90
350
Tiopo
120
590
Grand Kinkon
291
735
Kassa B
135
528
Kouya
86
334
174
451
124
322
Lafou
98
255
Kouravel
135
350
Fomi
90
374
Diareguela
72
400
36
173
Kogbdou
14
96
Morisanako
100
523
48
225
48
259
Souapiti
Amaria
Poudadl
Bonkon-Diaria
Fetore
Frankondou
Nzbla
Gozoguzia
Basse Guine
Moyenne Guine
Haute Guine
Guine
Forestire
Projets dcids :
- Lextension du barrage de Bumbuna par la phase suivante:
Phase 2: addition de 40 MW sur le barrage existant prvue en 2015;
Projets candidats :
- Lextension progressive du barrage de Bumbuna par les phases suivantes:
Phase 3: addition de 90 MW grce au barrage de Yiben en amont, prvue
en 2017;
Phase 4/5: addition de 95 MW sur les barrages de Yiben et de Bumbuna,
galement prvue en 2017.
- Laddition dun nouveau barrage en amont du barrage actuel de Goma et
linstallation de turbines supplmentaires pour un total de 6 MW prvue en
2015;
- Le nouveau barrage hydrolectrique de Benkongor avec 3 phases possibles:
Phase 1: 34.8 MW;
Phase 2: 80 MW;
Phase 3: 85.5 MW.
MP-WAPP/4NT/0217512/000/01 Ed. 2011/09/01
58/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Capacit [MW]
Kuse 2
91.8
679.7
Kambatibo
52.5
268.5
Bitmai 1
52.5
268
Bitmai 2
36.6
249.5
Mano River
180
795
Libria
Projets dcids:
- 10 MW de groupes diesel rapides (10 X 1MW) fonctionnant au DDO sur le
site de Bushrod. La mise en service est prvue en 2011;
- 10 MW de groupes diesel semi-rapides (2 X 5MW) fonctionnant au HFO sur
le site de Bushrod. La mise en service est prvue en 2013;
- La rhabilitation de lamnagement hydro-lectrique de Mount Coffee (66
MW pourront tre disponibles en 2014).
Projets candidats:
- Le projet Buchanan de 35 MW (2 x 17.5 MW) situ Kakata. La mise en
service est prvue en 2013;
- 30 MW de groupes diesel semi-rapides (6 X 5MW) fonctionnant au HFO sur
le site de Bushrod. La mise en service est prvue en 2015;
- Le dveloppement du fleuve St Paul par la cration de la SPRA (Saint Paul
River Authority) avec les sites hydro-lectriques de
Saint Paul - 1B: 78 MW et 512 GWh de productible annuel;
Saint Paul 2: 120 MW et 788 GWh de productible annuel.
Ces sites pourraient tre mis en service lhorizon 2018;
- La construction dun rservoir supplmentaire (Ultimate Via Storage) sur
le fleuve Saint Paul en amont des sites prcits. 132 MW pourraient tre
produits localement par la centrale V-1 grce ce rservoir. De plus, la
construction dun canal le reliant avec le rservoir Via de Mount Coffee
permettrait daugmenter les capacits des centrales hydrolectriques situes en
aval dans les proportions suivantes:
Mount Coffee: addition possible de 66 MW ;
Saint Paul - 1B: addition possible de 65 MW ;
Saint Paul - 2: addition possible de 100 MW.
MP-WAPP/4NT/0217512/000/01 Ed. 2011/09/01
59/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Pour le site situ sur la rivire Mano la frontire avec le Libria, un partage gal de
la puissance et du productible entre les deux pays est prvu. Linvestissement total
requis est estim 473 M$.
60/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
- Dans le cadre des projets de lOMVS, le Mali devrait bnficier dune partie
de la production des sites guinens de Koukoutamba (281MW, 858 GWh),
Boureya (160 MW, 717 GWh) et Balassa (181 MW, 470 GWh) tous les trois
situs sur le Bafing;
- Dans un horizon plus loign, les projets OMVS de Gourbassi (21 MW, 104
GWh) et Badoumbe (70 MW, 410 GWh), puis de Bindougou (50 MW, 289
GWh) et Moussala (30MW, 175GWh) pourraient galement voir le jour au
Mali.
Cte dIvoire
Projets dcids:
- Laddition de 222 MW sur le site du producteur indpendant CIPREL qui
formeront un cycle combin avec la turbine gaz de 111 MW mise en service
en 2010. La mise en service de la nouvelle turbine gaz est prvue en juillet
2012 et celle de la turbine vapeur en juillet 2013;
- Laddition durgence de 250 MW supplmentaires (total= 450MW) sur le site
de CIPREL ou Vridi grce une nouvelle turbine gaz et une nouvelle
turbine vapeur en 2012;
- Un cycle combin de 450 MW (2 turbines gaz et une turbine vapeur de
150 MW chacune) sur le site dAbbata. Les mises en services sont prvues en
2014 (1re turbine gaz), 2015 (2e turbine gaz) et 2016 (turbine vapeur).
- Un projet de cycle combin de 400 MW prvu Aboadze (Ghana) par le Plan
dUrgence et de Scurit dApprovisionnement en Energie Electrique de
lEEEOA. Une part de cette nergie devrait tre importe par la Cte dIvoire.
Projets candidats:
- Le projet de 270 MW du barrage de Soubr. La mise en service est prvue en
2018 ;
- Un cycle combin de 450 MW (2 turbines gaz et une turbine vapeur de
150 MW chacune) sur le site de Bassam qui constituera la 5e centrale
thermique dAbidjan. Les mises en services seraient prvues en 2020 (1re
turbine gaz), 2023 (2e turbine gaz) et 2025 (turbine vapeur);
- Les capacits des sites hydro-lectriques sont rpertories dans le tableau cidessous:
Bassins
Sites
Capacit
[MW]
Productible
annuel
[GWh]
SASSANDRA
Louga
280
1 330
Gribo Popoli
112
515
Boutoubre
156
785
BANDAMAN
Tiassal
51
215
CAVALLY
Tiboto
225
1 200
COMOE
Aboisso-Como
90
392
61/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
62/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Site
Capacit [MW]
Productible annuel
[GWh]
Juale
87
405
Pwalugu
48
184
Kulpawn
36
166
Daboya
43
194
Hemang
93
340
TABLE 35 Sites hydrolectriques envisags au Ghana
Projets dcids:
- Le projet de 147 MW du barrage dAdjarala avec un productible annuel de
366 GWh. La mise en service est prvue en 2017 par la CEB.
- Un projet de cycle combin de 450 MW (2 turbines gaz de 150 MW
chacune et une turbine vapeur de 150 MW) sur le site de Maria Glta (au
Bnin) dcid par le Plan dUrgence et de Scurit dApprovisionnement en
Energie Electrique de lEEEOA. Une part devrait tre ddie lalimentation
du Togo.
Projets candidats:
- Un projet olien de 20 MW raliser avec une nergie annuelle garantie de 40
GWh dont la mise en service est prvue en 2013;
- 100 MW de production thermique avec une nergie annuelle garantie de 350
GWh en 2013 (mise en service) et de 700 GWh partir de 2014;
- Un projet solaire de 5 MW de la CEB avec une nergie annuelle garantie de
10 GWh dont la mise en service est prvue en 2015;
63/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Togo
Projets dcids:
- 18 MW fonctionnant au HFO et formant la premire phase de la centrale de
Komsilga. La mise en service est prvue en 2011;
- 37.5 MW (3 groupes diesel de 12.5 MW fonctionnant au HFO et formant la
2e phase de la centrale de Komsilga. La mise en service est prvue en 2011;
- 36 MW (2 groupes diesel de 18 MW) fonctionnant au HFO qui formeront la
3e phase de la centrale de Komsilga (total 90MW). La mise en service est
prvue en 2013;
- 20 MW (2 groupes diesel de 10 MW fonctionnant au HFO et formant la 2e
phase de la centrale de Bobo 2. La mise en service est prvue en 2012.
- Un projet de cycle combin de 400 MW prvu Aboadze (Ghana) par le Plan
dUrgence et de Scurit dApprovisionnement en Energie Electrique de
lEEEOA. Une part de cette nergie devrait tre importe par le Burkina Faso.
Projets candidats:
- Un projet solaire de 20 MW dont 16 MW seraient ddis la socit minire
Semafo. La mise en service est prvue en 2012;
- Un projet solaire photovoltaque de 1.5MW (extensible 3MW)
Ouagadougou.
La mise en service est suppose intervenir en 2012
(financement dj engag);
- Un projet solaire photovoltaque de 20MW (extensible 40MW)
Ouagadougou. La mise en service est suppose intervenir en 2014;
64/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
65/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Nigria
Projets dcids:
- Un projet de cycle combin de 450 MW (2 turbines gaz de 150 MW
chacune et une turbine vapeur de 150 MW) sur le site de Maria Glta (au
Bnin) dcid par le Plan dUrgence et de Scurit dApprovisionnement en
Energie Electrique de lEEEOA. Une part devrait tre ddie lalimentation
du Nigria.
- FGN phase 1: 1408 MW dont 1055 MW ont t mis en service en 2007. Il
reste 353 MW prvus pour 2011;
- NIPP : 2599 MW prvus pour 2011;
- FGN phase 2: 2148 MW prvus dont 696 MW pour 2012 et 1452 MW pour
2013.
A ct de a, les compagnies ptrolires ont prvus les investissements suivants :
66/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Rivire
Sngal
Site
Falm
Flou
Gouina
Koukoutamba
Boureya
Balassa
Bindougou
Diaoya
Gourbassi
Bakoye
Tene
Moussala
Badoumbe
Tene I
Bafing
Pays
Mali
Mali
Guine
Guine
Guine
Mali
Guine
Mali/
Sngal
Mali
Mali
Guine
Capacit
Productible
annuel
Cot
estim
[MW]
[GWh]
[M$]
60
140
281
160
181
50
149
21
350
589
858
717
470
289
581
104
170
329
440
373
171
30
70
76
175
410
199
332
122
Statut
Mise en
service
suppose
EC
APD
APD
APS
F
PF
PF
F
2013
2017
CT
CT
CT
MT
LT
MT
PF
F
PF
MT
MT
LT
LOMVG est une organisation qui vise coordonner les actions des quatre pays
concern par le bassin du fleuve Gambie : le Sngal, la Guine, la Gambie et la
Guine Bissau. Par extension, dautres fleuves de la rgion sont concerns par cet
organisme.
Jusquici, lOMVG a deux grands projets.
Le premier grand projet se compose de deux parties et est prvu pour 2017 :
67/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
3.1.5.
Donnes de transport
Ce chapitre a pour but de synthtiser les donnes de transport qui ont t introduites
dans loutil doptimisation PRELE.
Les projets dcids ont une date de mise en service fixe. Les projets planifis ne sont
pas remis en cause mais la possibilit dun retard de 2 ans est examine. Enfin, les
projets envisags sont laisss libres loptimisation. Par ailleurs, des
investissements autres que les grands projets dinterconnexions sont proposs
loutil doptimisation
3.1.5.1.
PROJETS DCIDS
Cette section reprend les projets dcids pour lesquels les tudes sont termines et
pour lesquels le financement a t obtenu ou est sur le point de ltre.
Projet Dorsale 330kV
Le tronon Volta(Ghana) Sakt (Bnin) en passant par Lom qui devrait tre
mis en service en 2013;
Le tronon Riveria (Cte dIvoire) Ghana (Prestea). Il devrait tre mis en
service dici 2017.
Projet OMVG
Le projet OMVG comprend une ligne dinterconnexion 225kV simple terne
traversant la Guine, le Sngal, la Guine-Bissau et la Gambie pour partager la
production des sites hydrolectrique de Guine. La mise en service est prvue en
2017. Mais la premire phase (Linsan-Lab-Mali et Linsan-Kaolack-Tambacounda)
pourrait tre acheve plus court-terme (2015).
Projet CLSG (Cote dIvoire Liberia Sierra Leone Guine)
Une ligne dinterconnexion 225kV simple terne est prvue entre les postes Man
(Cte dIvoire) Yekepa (Libria) Nzrkor(Guine) Buchanan (Libria)
Monrovia (Libria) Bumbuna (Sierra Lone) Linsan (Guine). Sa mise en
service est prvue en 2015. A court-terme, un seul terne sera install. Nanmoins,
les pylnes sont prvus pour accueillir un second terne plus long terme.
Interconnexion Mali Cte dIvoire
Cette interconnexion 225kV reliera les postes de Ferkssdougou (Cte dIvoire)
Sikasso (Mali) - Koutiala (Mali) et Sgou (Mali). Elle est en cours de ralisation:
80% dj ralis ct Mali et 40% ct Cte dIvoire. La mise en service est
attendue courant 2012.
Notons que la ligne monoterne 225kV interne la Cte dIvoire qui est planifie
entre Laboa et Ferkssdougou complte ce projet en permettant de fermer la boucle
225kV interne la Cte dIvoire et une scurisation des interconnexions vers le
Nord.
68/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
PROJETS PLANIFIS
Cette section reprend des projets dj bien dtaills et ayant fait lobjet dtudes de
faisabilit mais pour lesquels des tudes complmentaires sont encore raliser
et/ou pour lesquels une partie du financement reste encore trouver.
69/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
3.1.5.3.
PROJETS ENVISAGS
Cette section reprend diffrents projets qui sont voqus dans les documents
collects ou lors des entretiens raliss durant les missions de collecte de donnes
dans les diffrents pays. Les tudes de prfaisabilit de ces projets nont pas encore
t entames ou sont en cours.
Projet dorsale mdiane
Ce projet est repris par CEB dans ses projets de dveloppement prioritaires. Cette
interconnexion relierait Yendi (Ghana) Kara (Togo) - Bembereke (Benin) et
Kaindji (Nigria). Elle serait attendue lhorizon 2020. Ce projet pourrait tre
justifi pour renforcer et vacuer la puissance produite par le site de Kaindji vers les
zones nord de ces pays.
Nanmoins ce projet ncessite dtre prcis et tudi plus en dtails notamment sur
les points suivants:
70/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Le poste de Yendi au Ghana est assez dcentr avec une charge relativement
faible et il ny a pas de projet dextension du rseau 330kV du Ghana pour
connecter cette sous-station 161kV. Il serait plus logique de prolonger cette ligne
jusqu laxe 330kV traversant le Ghana du Nord au Sud;
Lautre alternative est de raliser la dorsale mdiane en 161kV, lexception du
tronon Kainji-Bembereke, qui serait, lui, en 330kV.
3.1.5.4.
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
71/167
4.
4.1.
4.1.1.
Sngal
Longueur
de
Dagana
Matam
Kaolack
Touba
Kayes
Manantali (MALI)
Matam
Kayes
Sakal
Dagana
Tobne
Sakal
Touba
Tobne
Bel-Air
Hann
Bel-Air
Hann
Bel-Air
Hann
Cap-Des-Biches
Hann
Cap-Des-Biches
Hann
Cap-Des-Biches
Kounoune
Cap-Des-Biches
Sococim
Hann
Mbao
Hann
Kounoune
Kounoune
Sococim
Mbao
Cap-Des-Biches
Sococim
Mbour
Sococim
Thiona
Thiona
Tobne
Tobne
Taba
Tobne
Mckh
Tobne
Kounoune
[km]
Tension
d'exploitation
[kV]
Limite
thermique
[MVA]
267
70
184
256
114
124.5
105
5
5.5
5.5
18.19
16.15
6.47
6.6
10.95
22.99
4.68
7.18
46.6
35.4
31.35
13
35.79
55.37
225
225
225
225
225
225
225
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
250
250
250
250
250
250
250
91.9
132.9
132.9
132.9
86.5
91.9
91.9
86.5
132.9
86.5
91.9
139.3
86.5
71.7
132.9
86.5
132.9
72/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
La situation actuelle du systme du Sngal est prsente aux deux tables suivantes
(lignes et transformateurs).
TRANSFORMATEURS - SENEGAL
Sous-station
Bel-Air
Bel-Air
Bel-Air
Bel-Air
Bel-Air
Bel-Air
Bel-Air
Bel-Air
Bel-Air
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
Cap-des-Biches
V1 (kV)
90
90
90
90
90
15
15
11
7
90
90
13
13
13
12
12
7
7
V2 (kV)
30
30
6.6
6.6
6.6
90
90
90
6.6
33.5
33.5
90
93.6
93.6
90
97.2
95
95
Sn (MVA)
80
80
36
10
10
50
50
52
20
33
33
36
33
33
40
27
30
26.5
Sous-station
Cap-des-Biches
Hann
Hann
Hann
Kaolack
Kaolack
Kaolack
Kaolack
Mbao
Mbao
Mbour
Thiona
Thiona
Tobene
Tobene
Tobene
Touba
Touba
V1 (kV)
7
90
90
90
225
225
225
225
90
90
90
90
90
225
225
90
225
225
V2 (kV)
95
33.5
33.5
33.5
15
15
33
33
33
33
33
33
33
90
90
30
33
33
Sn (MVA)
26.5
80
80
80
50
50
40
40
40
40
40
40
40
75
75
20
40
40
Gambie
La situation actuelle du systme de Gambie est prsente aux deux tables suivantes
(lignes et transformateurs).
Les infrastructures connectes une tension suprieure ou gale 11kV ont t
considres. Le systme est caractris par 10 lignes de transport, 12 transformateurs
et aucune compensation ractive.
LIGNES - GAMBIE
Nom de la ligne
de
Bijilo
Brikama
Brikama
Brikama
Brikama
Kotu
Kotu
Mile2
Mile5
Kotu
Kotu
Bijilo
Medina
Medina
Wellingara
Mile5
Wellingara
Wellingara
Mile2
Mile5
Longueur
[km]
Tension
d'exploitation
[kV]
Limite
thermique
[MVA]
8
40
N/A
N/A
22
6
10
17
6
6
33
33
33
33
33
33
33
33
33
11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
73/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
4.1.2.
TRANSFORMATEURS - GAMBIE
Sous-station
Brikama
Brikama
Brikama
Brikama
Bijilo
Kotu
Kotu
Kotu
Mile5
Mile2
Medina
Wellingara
V1 (kV)
33
33
33
33
33
33
33
33
33
33
33
33
V2 (kV)
11
11
11
11
11
11
11
11
11
11
11
11
Sn (MVA)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Table 40 Transformateurs Gambie
4.1.3.
Guine Bissau
de
Antula
Centrale
Longueur
[km]
Tension
d'exploitation
[kV]
Limite
thermique
[MVA]
N/A
N/A
30
30
N/A
N/A
Centrale
Bra
V1 (kV)
30
30
30
30
V2 (kV)
10
10
10
10
Sn (MVA)
15
15
15
15
74/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
La situation actuelle du systme de Guine Bissau est prsente aux deux tables
suivantes (lignes et transformateurs).
4.1.4.
Guine
La situation actuelle du systme de Guine est prsente aux trois tables suivantes
(lignes, transformateurs et shunts).
Les infrastructures connectes une tension suprieure ou gale 15kV ont t
considres. Le systme est caractris par 24 lignes de transport, 37 transformateurs
et 4 compensations ractives.
Longueur
de
Linsan
Kindia
Kindia
Gdes Chutes
G.chte
Matoto
G.chte
Matoto
G.chte
Matoto
Donkea
Gdes Chutes
G.chtes
Yessoulou
Yessoulou
Manah
Manah
Sonfonah
Sonfonah
Matoto
Matoto
Libraport
Libraport
Tombo
Dabola
Bissikrima
Dabola
Faranah
Dalaba
Mamou
Derivation
Lab
Derivation en T
Dinguiraye
Pita
Timbi Madina
Pita
Dalaba
Timbi Madina
Dervation
Usine
Dabola
Usine
Pita
Donkea
Baneah (Ancienne)
Donkea
Baneah (Nouvelle)
Grandes Chutes
Donkea
[km]
Tension
d'exploitation
[kV]
Limite
thermique
[MVA]
65
30.4
69
69
66
13
37
5
13
10
16
1
24
102
43
26
71
10
48
10
7
5
8
8
13
110
110
110
110
110
110
60
60
60
60
60
60
30
30
30
30
30
30
30
30
30
30
15
15
15
97
90
97
97
90
90
49
49
49
49
49
40
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
75/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
LIGNES - GUINEE
Nom de la ligne
Sous-station
Centrale Banah
Centrale Banah
Centrale Donka
Centrale Donka
Centrale G.chutes
Centrale G.chutes
Centrale G.chutes
Centrale G.chutes
Centrale Tombo1
Centrale Tombo1
Centrale Tombo1
Centrale Tombo1
Centrale Tombo2
Centrale Tombo2
Centrale Tombo3
Centrale Tombo3
Centrale Tombo3
Centrale Tombo3
CentraleGarafiri
V1 (kV)
15
15
110
110
65
65
60
60
20
20
20
20
20
20
20
20
20
20
110
V2 (kV)
3.15
3.15
6.3
6.3
5.5
5.5
3.3
3.3
6
6.6
6.6
11
11
11
6.3
6.3
6.3
6.3
21
TRANSFORMATEURS - GUINEE
Sn (MVA)
Sous-station
2.78
Poste 110 kV Garafiri
2.78
Poste 110 kV Garafiri
8.5
Poste 110 kV Garafiri
8.5
Poste CE Sonfonia
11
Poste G.cutes
11
Poste Kindia
6.3
Poste Mamou
6.3
Poste Manah
6.25
Poste Manah
6.25
Poste Matoto
6.25
Poste Matoto
3
Poste Matoto
6
Poste Matoto
6
Poste Sonfonia
16
Poste Tombo
16
Poste Tombo
16
Poste Tombo
16
Poste Yessoulou
6.3
V1 (kV)
114
114
114
60
110
110
110
55.44
20
121
110
110
110
55.44
60
55.6
55.6
60
V2 (kV)
5.65
5.65
5.65
6.2
60
15
31.5
16.5
16.5
63
20
20
20
22
20
20
20
0.4
Sn (MVA)
31.5
31.5
31.5
4.6
12.5
15
15
10
8
25
50
15
15
10
50
15
15
0.3
Type
Matoto
Matoto
Sonfona
Tombo
Capa.
Ind.
Ind.
Ind.
Tension
(kV)
20
20
20
20
Bancs
2
2
1
4
Capacit/banc Capacit
(MVAr)
(MVAr)
-5
-10
3.84
7.68
3.84
3.84
3.84
15.36
Table 45 Shunts Guine
4.1.5.
Sierra Leone
La situation actuelle du systme du Sierra Leone est prsente aux trois tables
suivantes (lignes, transformateurs et shunts).
Les infrastructures connectes une tension suprieure ou gale 161kV ont t
considres. Le systme est caractris par 6 lignes de transport, 9 transformateurs
et 6 compensations ractives.
La puissance nominale des transformateurs est fixe 100MVA indpendamment de
leur niveau de tension. Cela ne semble pas raliste et ces valeurs sont ds lors en
rouge dans le tableau.
76/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
de
Bumbuna
Kamakwie
Kenema
Kenema
Yonibana
Freetown
Longueur
Goma
Yonibana
Bo
Goma
Bumbuna
Bumbuna
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
142
60
116
95
76
205
225
225
225
225
225
161
327
327
327
327
327
201
V1 (kV)
225
225
161
225
161
225
225
33
225
V2 (kV)
33
161
13.8
161
11.8
33
33
11
33
Sn (MVA)
100
100
100
100
100
100
100
100
100
Type
Freetown
Bo
Bo
Bumbuna
Bumbuna
Kenema
cap.
ind.
ind.
ind.
ind.
ind.
Tension
(kV)
11
225
225
225
225
225
Bancs
-
Capacit
Capacit
/banc (MVAr) (MVAr)
-15
10
10
5
10
5
Table 48 Shunts Sierra Leone
4.1.6.
Libria
La situation actuelle du systme du Libria est prsente aux deux tables suivantes
(lignes, transformateurs).
Les infrastructures connectes une tension suprieure ou gale 66kV ont t
considres. Le systme est caractris par 4 lignes de transport et 4 transformateurs.
77/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
LIGNES - LIBERIA
Nom de la ligne
de
Bushrod
Bushrod
Stockton Creek
Stockton Creek
Longueur
Kru Town
Stockton Creek
Capitol
Paynesville
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
7
3
5
12
66
66
66
66
40
40
40
40
TRANSFORMATEURS - LIBERIA
Sous-station
Bushrod Island
Capitol
Kru Town
Paynesville
V1 (kV)
66
66
66
66
V2 (kV)
22
22
22
22
Sn (MVA)
10
10
10
10
Mali
La situation actuelle du systme du Mali est prsente aux deux tables suivantes
(lignes, transformateurs).
Les infrastructures connectes une tension suprieure ou gale 33kV ont t
considres. Le systme est caractris par 24 lignes de transport, 47
transformateurs et aucune compensation ractive.
78/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
4.1.7.
Nom de la ligne
Longueur
de
Manantali
Kayes (SENEGAL)
Manantali
Kodialani
Fana
Sgou
Kalabancoro
Sirakoro
Kodialani
Lafiabougou
Kodialani
Kalabancoro
Sirakoro
Slingu
Sirakoro
Balingu
Sirakoro
Fana
Slingu
Yanfolila
Balingu
Koulikoro
Balingu
Sotuba
Balingu
Pont des Martryr1
Balingu
Pont des Martryr2
Darsalam
Martyr 1(arien)
Darsalam
Martyr 2
Fana
Diola
Lafiabougou
Darsalam
Lafiabougou
Badalabougou
Pont Martyr
Badalabougou (ancien)
Pont Martyr
Badalabougou (nouveau )
Sgou(Plengana)
Markala
Sotuba
Badalabougou
Yanfolila
Kalana
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
184
306
109
17
6.42
5
118
12
112
68.5
49.5
4.4
3.5
3.5
4
4.9
35.7
8.385
6
1.9
1.9
40
7.7
48.5
225
225
150
150
150
150
150
150
150
63
33
33
33
33
33
33
33
33
33
33
33
33
33
33
250
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
79/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
LIGNES - MALI
TRANSFORMATEURS - MALI
V1 (kV)
16.5
0.4
16.5
16.5
15
15
15
10
6.6
0.4
0.4
16.5
11
5.5
5.5
5.5
0.4
0.4
0.4
0.41
15.5
15
15
15.5
V2 (kV)
31.5
15
31.5
31.5
150
150
30
150
15
15.5
15
31.5
33
16.5
15.5
15.5
15.5
15.5
15.5
30
150
30
400
150
Sn (MVA)
20
0.16
7.5
6
60
54
24
20
2.8
3
2
10
30
8
7
5.3
1.6
1.6
1.6
1
10
5
0.15
30
Sous-station
Kalabancoro
Kalabancoro
Kalana
Koulikoro
Lafiabougou
Lafiabougou
Lafiabougou
Sgou
Sgou
Sgou
Sgou
Sgou
Slingu
Slingu
Slingu
Sirakoro
Sotuba
Sotuba
Sotuba
Sotuba
Sotuba
Yanfolila
Yanfolila
V1 (kV)
7.045
0.4
6.6
15
15.5
7.045
0.4
15.5
15
15
15
0.4
33
8.66
8.66
15.5
16.5
15
2
2
0.41
33
0.4
V2 (kV)
150
15
33
30
150
150
15
150
30
30
400
15
63
150
33
150
31.5
30
31.5
31.5
31.5
63
33
Sn (MVA)
10
0.15
5
7.5
30
10
0.15
10
5
5
0.15
0.8
Dec-16
39/54
14/20
22.5
8.3
7.5
3.4
3.4
0.315
12
0.25
4.1.8.
Cte dIvoire
La situation actuelle du systme de la Cte dIvoire est prsente aux trois tables
suivantes (lignes, transformateurs, shunts).
Les infrastructures connectes une tension suprieure ou gale 90 kV ont t
considres. Le systme est caractris par 71 lignes de transport, 44
transformateurs et 13 compensations ractives.
80/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Badalabougou
Badalabougou
Balingu
Balingu
Balingu
Balingu
Balingu
Balingu
Balingu
Balingu
Balingu
Darsalam
Darsalam
Darsalam
Darsalam
Darsalam
Darsalam
Darsalam
Darsalam
Dioila
Fana
Fana
Fana
Kalabancoro
Longueur
[km]
de
Abobo
Abobo
Abobo
Abobo
Azito
Bouake
Buyo
Ferke
Ferke
Kossou
Man
Man
Prestea (GHN)
Riviera
Soubre
Soubre
Taabo
Taabo
Yopougon
Abobo
Abobo
Abobo
Abobo
Abobo
Abobo
Agboville
Agnibilikro
Attakro
Ayame
Ayame
Bassam
Bianord
Biasud
Biasud
Bongo
Bouake
Azito
Azito
Azito
Yopougon
Vridi
Kossou
Soubre
Bouake
Kodeni (BF)
Taabo
Buyo
Laboa
Abobo
Vridi
Taabo
San Pedro
Abobo
Abobo
Azito
Bianord
Bianord
Bongo
Plateau
Dabou
Yopougon
Yopougon
Abengourou
Abengourou
Ayame
Abrobakro
Abrobakro
Riviera
Riviera
Riviera
Ayame
Marabadiasa
Tension
dexploitation
[kV]
16.7
16.7
16.7
8.4
12.2
109.9
82.2
233.8
221.8
124
193.2
152
220
19.6
196
117
170
170
8.4
5
5
58.1
2.5
58
13.8
34
53
40
4
59
25
10.3
11
11
65.7
82
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Limite
Thermique
[MVA]
327
327
327
327
330
327
327
327
327
246
327
246
327
327
327
327
246
327
327
72
72
75
75
75
72
75
75
75
72
72
72
72
72
72
72
75
Nom de la ligne
de
Bouake
Bouake
Bouake
Boundiali
Buyo
Daloa
Dimbokro
Divo
Gagnoa
Gagnoa
Hire
Korhogo
Kossou
Laboa
Laboa
Man
Odienne
Odienne
Plateau
Plateau
Plateau
Riviera
San Pedro
Sir
Soubre
Taabo
Taabo
Treichville
Treichville
Vridi
Vridi
Yamoussokro
Yopougon
Yopougon
Zuenoula
Longueur
Serebou
Bouake
Kossou
Korhogo
Daloa
Kossou
Attakro
Hire
Kossou
Divo
Taabo
Ferke
Yamoussokro
Seguela
Man
Danane
Boundiali
Laboa
Treichville
Treichville
Bianord
Bassam
Faye
Vridi
San Pedro
Dimbokro
Agboville
Vridi
Vridi
Biasud
Biasud
Dimbokro
Abobo
Vridi
Kossou
[km]
Tension
dexploitation
[kV]
Limite
Thermique
[MVA]
132
26.4
115.3
103.5
112
110.6
103.9
32
120
81
32
48.3
53.3
82
152
76.8
123.1
122.2
3.8
3.8
2.5
28.6
38
7
117
72.2
119
6.5
6.5
8
8
67.4
34
15.7
92.7
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
75
75
72
75
75
75
75
75
72
75
75
72
72
75
132
75
75
75
75
75
75
72
75
75
132
75
75
100
100
72
72
72
75
72
75
V1 (kV)
225
225
225
225
5.5
5.5
5.5
5.5
15.75
15.75
15.75
225
225
10.5
10.5
10.5
11
225
225
17
17
17
V2 (kV)
93
93
93
93
90
90
90
90
230
230
230
93
93
235
235
95
97
96
96
240
240
95
Sn (MVA)
70
70
70
70
15
19
15
19
190
190
190
70
70
61
61
82.5
151
65
65
72
72
72
Sous-station
Laboa
Man
Riviera
San Pedro
San Pedro
Soubre
Taabo
Taabo
Taabo
Taabo
Taabo
Vridi
Vridi
Vridi
Vridi
Vridi
Vridi
Vridi
Vridi
Vridi
Yopougon
Yopougon
V1 (kV)
225
225
225
225
225
225
225
225
13.8
13.8
13.8
225
225
225
11
11
11
11
11
15
225
225
V2 (kV)
93
93
90
93
93
93
93
93
235
235
235
93
93
93
97
97
97
235
235
236
93
93
Sn (MVA)
50
70
70
65
70
70
70
70
82.5
82.5
82.5
70
70
70
51
51
51
61
61
151
100
100
81/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Type
Abobo
Bia - Nord
Bia - Sud
Plateau
Riviera
Treichville
Vridi
Yopougon
Bouake
Ferke
Laboa
Man
Soubre
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Ind.
Ind.
Ind.
Ind.
Ind.
Tension
(kV)
15
15
15
15
15
15
15
15
90
225
225
225
225
Bancs
3
5
4
2
1
3
3
5
1
1
1
1
1
Capacit
Capacit
/banc (MVAr) (MVAr)
-7.2
-14.4
-7.2
-21.6
-7.2
-21.6
-7.2
-14.4
-7.2
-7.2
-7.2
-21.6
-7.2
-21.6
-7.2
-21.6
20
0
40
40
20
20
20
20
40
40
Table 55 Shunts Cte dIvoire
4.1.9.
Ghana
82/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
La situation actuelle du systme du Ghana est prsente aux quatre tables suivantes
(lignes, transformateurs, capacits, selfs).
Longueur
[km]
de
Akosombo
Akosombo
Kpong SS
Kpong SS
Akosombo
Akosombo
Akosombo
Akosombo
Akosombo
Kpong GS
Akosombo
Akosombo
Akosombo
Asiekpe
Akosombo
Aflao
Akosombo
Volta
Volta
Volta
Volta
Volta
Volta
Volta
Volta
Volta
Volta
Volta
Achimota
Achimota
Mallam
Winneba
Cape Coast
Aboadze
Aboadze
Aboadze
Takoradi
Essiama
Barge (OPB)
Takoradi
New Tarkwa
Kpong SS-1
Kpong SS-2
Volta-1
Volta-2
Volta-1
Volta-2
Volta-3
Volta-4
Kpong GS
Volta
Tafo-1
Tafo-2
Asiekpe
Lome (TOG)
Aflao
Lome (TOG)
Kumasi
Smelter-1
Smelter-2
Smelter-3
Smelter-4
Smelter-5
Smelter-6
New Tema-1
New Tema-2
Achimota-1
Achimota-2
Achimota-3
Mallam
Winneba
Cape Coast
Aboadze
Aboadze
Prestea
Takoradi-1
Takoradi-2
Essiama
Barge (OPB)
Elubo
Tarkwa
Prestea
Tension
dexploitation
[kV]
16.1
16.1
51.5
51.5
67.6
67.6
67.6
67.6
24.6
63.2
61.2
61.2
54.7
54.7
124.8
3.9
226.3
5.2
5.2
5.2
5.2
5.2
5.2
3.2
3.2
25.7
25.7
25.7
15
57.9
116.9
132
58
83
15
15
70.5
51.5
21.9
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
Limite
Thermique
[MVA]
213
213
213
213
213
213
213
213
213
273
170
182x2
128
128
128
128
182x2
213
213
213
213
213
213
182x2
182x2
213
213
213
170
170
150
150
150
182x2
170
170
182
364
364
170
170
Nom de la ligne
de
Tarkwa
New Tarkwa
Prestea
Abobo (IC)
Border
Abobo
Prestea
Bogoso
Bogoso
Dunkwa
Bogoso
Wexford
Dunkwa
Asawinso
Dunkwa
New Obuasi
New Obuasi
Obuasi
Kumasi
Tow26-2
Tow26-2
Kenyasi
Obuasi
Tow26-1
Tow26-1
Kenyasi
Kumasi
New Obuasi
Prestea
Obuasi
New Obuasi
Akwatia
Kumasi
Konogo
Konogo
Nkawkaw
Nkawkaw
Tafo
Tafo
Akwatia
Kumasi
Techiman
Techiman
Sunyani
Techiman
Tamale
Techiman
Teselima
Teselima
Sawla
Tamale
Bolgatanga
Tamale
Yendi
Sunyani
Kenyasi
Aboadze
Volta
Sawla
Wa
Asiekpe
Ho
Ho
Kpeve
Kpeve
Kpandu
Asiekpe
Sogakofe
Sunyani
Mim
Bolgatanga
Bawku
Bawku
Dapaong (TOG)
Volta
Asogli (Dum)
New Tema
TT1P
Afloa
DCEM
Asogli
Asogli (Dum)
Longueur
[km]
Tension
dexploitation
[kV]
Limite
Thermique
[MVA]
8.3
220
145.6
13
66
51
69.2
24.9
7.1
10
94
43.1
94
112.2
110
51.5
53.1
59.5
54.7
115
54.9
248.1
89.1
128.6
158.1
100
40
215
95
44
22
35.6
31.2
60
80
65
-
161
225
225
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
330
161/34.5
69
69
69
69
161/34.5
161/34.5
161/34.5
161
161
161
161
170
327
327
150
150
182
142
170
170
364
244
170
244
364
182x2
244
170
170
170
170
182x2
244
182x2
182x2
182
244
182
182x2
500x2
182/39
57
57
57
57
182/39
182/39
182/39
213
213
180
324
83/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
LINES - GHANA
Nom de la ligne
V1 (kV)
161
13.8
13.8
13.8
13.8
13.8
161
161
161
161
161
161
161
14.4
14.4
14.4
14.4
14.4
14.4
161
161
161
161
161
161
161
161
161
161
161
161
161
225
161
69
161
161
69
69
13.8
13.8
13.8
13.8
161
161
161
161
161
161
161
V2 (kV)
34.5
169
169
169
161
161
34.5
34.5
34.5
34.5
34.5
11.5
11.5
161
161
161
161
161
161
11.5
11.5
34.5
34.5
34.5
74.29
74.29
34.5
34.5
36
11.5
34.5
11.5
161
34.5
11.65
11.5
11.5
34.95
34.95
169
169
169
169
11.5
11.5
11.5
34.5
34.5
34.5
34.5
V3 (kV)
Sn (MVA)
66
#
#
#
#
#
66
66
66
66
33
40/53
40/53
#
#
#
#
#
#
13
6.63
5
13
13
33
11.7
33
11.7
33
33
33
11.5
20
6.64
13
11.5
33
6.63
5
#
33
7
6.63
5
6.63
5
6.6
20
7
51
51
51
51
5
6.6
18
6.6
18
66
66
33
66
Sous-station
Mallam
New Obuasi
New Obuasi
New Obuasi
New Tarkwa
New Tarkwa
New Tema
New Tema
New Tema
New Tema
New Tema
Nkawkaw
Obuasi
Obuasi
Obuasi
Old Kpong
Old Kpong
Prestea
Prestea
Prestea
Prestea
Prestea
Sawla
Smelter
Smelter
Smelter
Smelter
Smelter
Smelter
Smelter
Smelter
Sogakope
Sunyani
Sunyani
Tafo
Tafo
Takoradi
Takoradi
Tamale
Tamale
Tarkwa
Tarkwa
Techiman
Techiman
Wexford
Winneba
Winneba
Yendi
Zebila
V1 (kV)
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
225
225
13.2
161
161
161
161
161
161
161
161
161
69
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
V2 (kV)
34.5
11.5
11.5
11.5
11.5
11.5
11.5
34.5
34.5
34.5
34.5
11.5
6.64
6.64
6.64
34.5
34.5
55
55
161
161
161
36
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
34.5
36
36
11.5
34.5
34.5
34.5
36
36
34.5
34.5
36
34.5
34.5
11.5
11.5
34.5
34.5
V3 (kV)
6.58
6.58
6.58
6.6
6.6
3.3
6.64
11.5
11.5
11.5
6.63
6.63
13.2
13.2
11.5
11.5
6.64
11.5
11.5
11.5
6.63
6.64
Sn (MVA)
66
33
33
33
33
33
20
66
33
66
66
13.3
20
20
20
33
33
13.3
20
200
200
26.7
13.3
18
18
85
85
85
85
85
85
15
20
20
13.3
33
33
33
20
20
33
33
20
20
33
5
20
13.3
33
84/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
TRANSFORMATEURS - GHANA
Sous-station
Achimota
Aboadze
Aboadze
Aboadze
Aboadze
Aboadze
Achimota
Achimota
Achimota
Achimota
Aflao
Ahafo
Ahafo
Akosombo
Akosombo
Akosombo
Akosombo
Akosombo
Akosombo
Akosombo
Akwatia
Akwatia
Asawinso
Asawinso
Asiekpe
Asiekpe
Bogoso
Bogoso
Bolgatanga
Cape Coast
Cape Coast
Dunkwa
Elubo
Essiama
Ho
Konongo
Konongo
Kpando
Kpeve
Kpong Gs
Kpong Gs
Kpong Gs
Kpong Gs
Kpong Gs
Kumasi
Kumasi
Kumasi
Kumasi
Kumasi
Mallam
Tension (kV)
Bancs
Achimota
Achimota
Asawinso
Cape Coast
Kenyase
Kpando
Kumasi
Kumasi
Kumasi
Kumasi
Kumasi
Kumasi
Mallam
New Obuasi
New Tema
Obuasi
Prestea
Prestea
Smelter
Suniany
Suniany
Takoradi
Techiman
Winneba
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
Capa.
34.5
34.5
34.5
11.5
11
34.5
11.5
11.5
34.5
34.5
161
34.5
34.5
11.5
34.5
6.6
6.6
13.2
14.4
34.5
11.5
34.5
34.5
34.5
2
2
1
1
1
1
2
1
2
1
1
1
2
3
1
4
4
2
4
2
2
3
1
2
Capacit
Capacit (MVAr)
/banc (MVAr)
-22.6
-21.6
-10.8
-1.2
SVC
-5.4
-1.8
-5.4
-10.8
-12
-25
-21.6
-10.8
-5.4
-10.8
-1.8
-1.2
-20
-21.6
-5.4
-5.4
-10.8
-10.8
-10.8
-45.2
-43.2
-10.8
-1.2
-40
-5.4
-1.8
-5.4
-21.6
-12
-25
-21.6
-21.6
-16.2
-10.8
-7.2
-4.8
-40
-86.4
-10.8
-10.8
-32.4
-5.4
-21.6
Tension
(kV)
161
161
161
161
161
Bancs
16
16
16
16
16
Capacit (MVAr)
Min
Max
8.5
17
8.5
17
8.5
17
8.5
17
8.5
17
Table 59 Self shunt Ghana
4.1.10. Togo/Bnin
La situation actuelle du systme du Togo et du Bnin est prsente aux trois tables
suivantes (lignes, transformateurs, shunts).
Les infrastructures connectes une tension suprieure ou gale 63 kV ont t
considres. Le systme est caractris par 42 lignes de transport, 64 transformateurs
et 3 aucune compensations ractives.
85/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom de la ligne
de
Ikeja West (NIG)
Atakpam
Ava
Bohicon
Dapaong
Djougou
Kara
Kara
Kara
Lom Aflao
Lom Aflao
Lom Port
Lom Port
Mango
Maria Grta
Maria Grta
Maria Grta
Maria Grta
Maria Grta
Maria Grta
Mom Hagou
Mom Hagou
Mom Hagou
Nangbto
Parakou
Sakt
Sakt
Sakt
Sakt
Sakt
Sakt
Birnin-Kebbi (NIG)
Kara
CAK
CGB
Cotonou Vdoko
Mom Hagou
Mom Hagou
Mom Hagou
Mom Hagou
TAN
TAN
Longueur
Sakete
Nangbto
Mom Hagou
Onigbolo
Bawku (GHN)
Parakou
Atakpam
Djougou
Mango
Asiekpe (GHN)
Aflao (GHN)
Lom Aflao 1
Lom Aflao 2
Dapaong
Cotonou Vdoko 1
Cotonou Vdoko 2
Cotonou Vdoko 3
Cotonou Vdoko 4
Ava
Mom Hagou
Lom Aflao 1
Lom Aflao 2
Nangbto
Bohicon
Onigbolo
Maria Grta 1
Maria Grta 2
Tanzoun1
Tanzoun2
Onigbolo
Cotonou Vdoko
Niamey
Sokod
PNO
CAK
CGB
CIMAO
Anfouin
Lokossa
Scantogo
PNO
PNO
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
75
36.5
54
75
65
131
239
58
137
54.7
3.9
17.2
17.2
75
11
11
11
11
38
92
56
56
116
80.3
300
55
55
28
28
47
N/A
252
76
33
5.5
4.43
10
20
29
15
70
70
330
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
132
66
63
63
63
63
63
63
63
63
63
686
120
105
120
182
120
120
120
120
128
128
120
120
120
120
120
120
120
105
105
105
105
120
120
120
120
120
120
120
120
N/A
84.6
30
65
90
90
40
90
90
40
90
90
86/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
LIGNES - TOGO/BENIN
V2 (kV)
20
20
20
15
34
34
20
63
20
161
161
20
15
15
63
63
15
15
15
34
34
34
34
34
34
34
20
20
20
20
21
21
V3 (kV)
Sn (MVA)
17
16
16
19
20
13
20
13
20
20
35
63
63
20
20
20
10
10
4
4
20
20
13
20
13
20
20
20
13
20
13
22
20
22
20
50
50
17
17
10.5
50
10.5
50
Sous-station V1 (kV)
Lom Aflao
161
Lome Port
161
Lome Port
161
Lome Port
11
Lom Port GT CEB 11
Lom Port Sub
161
Lom Port Sub
161
Malanville
161
Malanville
161
Mango
161
Mango
161
Maria Glta
161
Maria Glta GT CEB 11
Mome Hagou
161
Mome Hagou
161
Nangbto
10.3
Nangbto
10.3
Nangbto
10.3
Nangbto
10.3
Onigbolo
161
Onigbolo
161
Parakou
161
Sakete
330
Sakete
330
Sakete
161
Sokode
161
Sokode
161
Tanzoun
161
Tanzoun
161
Vedoko
161
Vedoko
161
Vedoko
161
V2 (kV)
21
20
20
161
166
20
20
34
34
20
20
15
161
63
63
166
166
161
161
20
20
34
161
161
20
66
66
63
63
63
63
15
V3 (kV)
10.5
Sn (MVA)
35
35
25
35
32
20
20
12.5
12.5
12.5
12.5
19
32
50
50
35.5
35.5
35.5
35.5
35
35
20
200
200
35
50
50
80
80
80
55
40
20
20
20
20-15
20-15
15
Type
Tension (kV)
Bancs
Kara
Onigbolo
Parakou
ind.
ind.
ind.
161
161
161
3
3
Capacit
Capacit (MVAr)
/banc (MVAr)
18
3
9
3
9
Table 62 Shunts Togo/Benin
87/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
TRANSFORMATEURS - TOGO/BENIN
Sous-station
V1 (kV)
Anfoin
161
Atakpam
161
Atakpam
161
Avakpa
155
Bembereke
161
Bembereke
161
Bohicon
161
Bohicon
161
CIN
161
ContorGlobal
15
ContorGlobal
15
ContorGlobal
15
Cotonou Apkapka
63
Cotonou Apkapka
63
Cotonou Apkapka
5.5
Cotonou Apkapka
5.5
Cotonou Apkapka
5.5
Cotonou Apkapka
5.5
Cotonou Gbegamey
62
Dapaong
161
Dapaong
161
Djougou
161
Kandi
161
Kandi
161
Kara
161
Kara
161
Legbassito
161
Legbassito
161
Lokossa
63
Lokossa
63
Lom Aflao
161
Lom Aflao
161
de
Ferke (IC)
Kodeni
Pa
Bagre
Kompienga
Zano
Zagtouli
Ouaga1
Ouaga1
Patte D'Oie
P.C
Zagtouli
Kossodo
Koupla
Kombissiri
Tenkodogo
Ziga
Ziniar
Zano
Bobo1
Kodeni
Kodeni
Koua
Koua
Kodeni
P.D
P.D
Banfora
Niofila
Komsilga
Kossodo
Kossodo
Ouaga 2000
Ouaga1
Patte D'Oie
Patte D'Oie
Zagtouli
Kompienga
Ouaga 2000
Banfora
Kodeni
Pa
Zagtouli
Zano
Zano
Patte D'Oie
Koudougou
Ouaga2
P.C
Zagtouli
Kossodo
Ouaga2
Ziniar
Tenkodogo
Manga
Zano
Ziniar
Kaya
Koupla
Bobo2
Bobo2
Bobo2
Bobo1
Kodeni
P.D
Banfora
Orodara
Niofila
Tourni
Ouaga 2000
Ouaga1
Ouaga2
Patte D'Oie
Ouaga2
Ouaga2
Kossodo
Komsilga
Pama
Kombissiri
Niangoloko
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
221
134
204
32
140
143
82
5
4
32
4
15
30
55
56
10
52
90
42
4
4
4
8
12
64
18
32
42
10
7
7
12
5
5
14
13
15
35
53
49
225
225
225
132
132
132
90
90
90
90
90
90
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
327
327
327
110
110
110
75
75
75
75
72
72
21
21
21
21
21
21
21
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
17
11
11
8
88/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Nom de la ligne
V1 (kV)
132
132
6.6
6.6
33
33
33
5.5
5.5
5.5
5.5
33
33
5.5
5.5
5.5
5.5
5.5
225
225
33
132
132
6.6
11
90
90
33
33
33
11
15
15
11
11
11
11
11
V2 (kV)
6.6
6.6
132
132
20
15
15
15.75
15.75
15
15
15
15
34.5
34.5
34.5
15
15
35.5
35.5
34.5
6.6
6.6
132
33
33
33
16
16
15
34.5
33
33
33
33
35
35
34.5
V2 (kV)
15
15
15
15
15
15
15
15
33
33
33
16
16
16
15.75
15.75
16.68
33
15
15
16.4
16.4
16.4
16.4
16.4
15
15
33
33
33
33
15.89
15.89
33
90
90
33
33
Sn (MVA)
34.5
34.5
10
10
6
2
2
2.5
1
0.8
1
1
30-40
15
15
15
4
4
5
30-40
15
15
6.6
6.6
6.6
10.65
10.65
15
15
10/5/5
10
10
10
15
15
1
70
70
20/15/5
5
89/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
BAGRE
BAGRE
BAGRE
BAGRE
BANFORA
BOBO1
BOBO1
BOBO1
BOBO1
BOBO1
BOBO1
BOBO2
BOBO2
BOBO2
BOBO2
BOBO2
BOBO2
BOBO2
KODENI
KODENI
KODENI
KOMPIENGA
KOMPIENGA
KOMPIENGA
KOMSILGA
KOSSODO
KOSSODO
KOSSODO
KOSSODO
KOSSODO
KOSSODO G1
KOSSODO G2
KOSSODO G3
KOSSODO G4
KOSSODO G5
KOSSODO G6
KOSSODO G7
KOSSODO G8
Sous-station
BANFORA
KOSSODO
KOSSODO
KOSSODO
OUAGA1
OUAGA1
OUAGA1
OUAGA1
OUAGA2
OUAGA2
OUAGA2
OUAGA2000
PATTE D'OIE
KODENI
KOMPIENGA
PA
PATTE D'OIE
PATTE D'OIE
ZAGTOULI
4.1.12. Niger
La situation actuelle du systme du Niger est prsente aux trois tables suivantes
(lignes, transformateurs, shunts).
Les infrastructures connectes une tension suprieure ou gale 66 kV ont t
considres. Le systme est caractris par 11 lignes de transport, 21 transformateurs
et 3 compensations ractives.
LIGNES - NIGER
Longueur
Nom de la ligne
de
Dosso
Gazoua
Gazoua
Goudel
Goudel
Karma
Kollo
Lossa
Niamey 2
Niamey 2
Niamey Nord
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
132
72
78
32
9
41
22
30
31
13
4
132
132
132
66
66
66
66
66
66
66
66
N/A
84.6
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Niamey 2
Kastina (NIG)
Dosso
Karma
Niamey Nord
Lossa
Say
Tillabry
Kollo
Niamey Nord
Goudel
90/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
TRANSFORMATEURS - NIGER
V1 (kV)
V2 (kV)
V3 (kV)
Dosso
Goudel
Goudel
Goudel
Karma
Kollo
Lossa
Lossa
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey 2
Niamey Nord
Say
Tillabry
132
66
66
20
66
66
66
66
132
132
132
132
20
20
20
20
20
20
66
66
66
20
20
20
5.65
20
20
20
33
66
66
20
20
10.5
10.5
5
5
5
5
20
20
20
0.38
Sn (MVA)
5
10
10
16
2
2
2
10
15
10
20
20
16
16
4
4
4
4
10
6.3
6.3
Sous-station
Goudel
Niamey 2
Niamey 2
ind.
ind.
ind.
20
20
20
4
5
5
Table 68 Shunts Niger
4.1.13. Nigria
La situation actuelle du systme du Nigeria est prsente aux trois tables suivantes
(lignes, transformateurs, shunts).
Les infrastructures connectes une tension suprieure ou gale 132 kV ont t
considres. Le systme est caractris par 191 lignes de transport, 286
transformateurs et 18 compensations ractives.
91/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Longueur
de
Afam
Afam
Aja
Aja
Ajaokuta
Ajaokuta
Akangba
Akangba
Aladja
Aladja
Alaoji
Ayede
Ayede
Benin
Benin
Benin
Benin
Benin
Benin
Benin
Benin
Birnin-Kebbi
Egbin
Egbin
Gombe
Ikeja West
Ikeja West
Jebba G.S.
Jebba G.S.
Jebba T.S.
Jebba T.S.
Jebba T.S.
Jebba T.S.
Jebba T.S.
Jebba T.S.
Jebba T.S.
Jos
Kaduna
Kaduna
Kaduna
Katampe
Katampe
New Haven
Aba
Aba
Aba
Abakaliki
Abeokuta
Abuja
Abuja
Abuja
Abuja Central
Abuja Central
Abuja Gr. Cable
Abuja Gr. Cable
Alaoji
Alaoji
Egbin
Egbin
Benin
Benin
Ikeja West
Ikeja West
Delta
Sapele
Onitsha
Oshogbo
Ikeja West
Delta
Sapele
Sapele
Sapele
Ikeja West
Ikeja West
Onitsha
Oshogbo
Kainji
Ikeja West
Ikeja West
Jos
Sakete (BEN)
Oshogbo
Jebba T.S.
Jebba T.S.
Kainji
Kainji
Shiroro
Shiroro
Oshogbo
Oshogbo
Oshogbo
Kaduna
Kano
Shiroro
Shiroro
Shiroro
Shiroro
Onitsha
Alaoji
Alaoji
Itu
Nkalagu
Papalanto
Katampe
Katampe
Keffi
Abuja Gr. Cable
Abuja Gr. Cable
Katampe
Katampe
[km]
Tension
dexploitation
[kV]
25
25
14
14
195
195
18
18
32
63
138
119
137
107
50
50
50
280
280
137
251
310
62
62
265
75
235
8
8
81
81
244
244
157
157
157
197
230
95
95
150
150
96
8
8
64
54
35
15
15
51
4
4
6
6
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
132
132
132
132
132
132
132
132
132
132
132
132
LIGNES - NIGERIA
Limite
thermique
[MVA]
Nom de la ligne
de
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
777
720
777
777
720
686
777
N/A
N/A
720
720
720
720
720
720
720
720
720
720
720
720
720
777
91
91
91
91
91.5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Longueur
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
29
29
33
33
22
22
16
16
20
20
10
45
60
5
5
6
6
5
3
3
8
13
10
4
4
92
62
4
60
60
2
2
50
39
60
3
3
9
9
7
8
8
84
94
33
30
2
2
54
146
118
96
96
81
183
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
91
91
91
91
126
126
126
126
N/A
N/A
91
91
91
91.5
91.5
91.5
91.5
126
126
126
N/A
126
126
126
126
70
N/A
126
91
91
126
126
N/A
N/A
N/A
126
126
126
126
126
126
126
84.5
84.5
N/A
N/A
91
91
91
84.6
84.6
126
126
91
91
Afam
Alaoji
Afam
Alaoji
Afam
P.H. Main
Afam
P.H. Main
Agbara
Ikeja West
Agbara
Ikeja West
Agbara
Ojo
Agbara
Ojo
Aja
Alagbon
Aja
Alagbon
Ajaokuta
Ajaokuta Town
Ajaokuta
Itakpe
Ajaokuta Town
Okene
Akangba
Ijora
Akangba
Ijora
Akangba A
Isolo
Akangba A
Isolo
Akangba B Amuwo-Odofin
Akangba B
Itire
Akangba B
Itire
Akangba C
Apapa-Road
Akoka
Alagbon
Akoka
Ijora
Akoka
Oworonshoki
Akoka
Oworonshoki
Akure
Oshogbo A
Akwanga
Keffi
Alagbon
Ijora
Alaoji
Owerri
Alaoji
Owerri
Alausa
Ogba
Alausa
Ogba
Aliade
Makurdi
Aliade
Oturkpo
Aliade
Yandev
Alimosho
Ikeja West
Alimosho
Ikeja West
Alimosho
Ogba
Alimosho
Ogba
Amuwo-Odofin Apapa-Road
Amuwo-Odofin
Ojo
Amuwo-Odofin
Ojo
Ashaka Cements
Gombe
Ashaka Cements Potiskum
Awka
Oji River
Awka
Onitsha
Ayede
Ibadan North
Ayede
Jericho
Ayede
Sagamu
Bauchi
Gombe
Bauchi
Jos
Benin
Delta
Benin
Delta
Benin
Irrua
Benin
Okene
92/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Nom de la ligne
Longueur
[km]
de
Bida
Birnin-Kebbi
Birnin-Kebbi
Biu
Biu
Calabar
Dadinkowa
Dakata
Damboa
Dan-Agundi
Delta
Egbin
Egbin
Ejigbo
Ejigbo
Ejigbo
Ejigbo
Eket
Funtua
Funtua
Gazaoua (NIGER)
Gcm
Gombe
Gusau
Hadejia
Ibadan North
Ife
Ife
Ijebu-Ode
Ikeja West
Ikeja West
Ikeja West
Ikeja West
Ikeja West
Ikeja West
Ikorodu
Ikorodu
Ikorodu
Ilesa
Ilesa Tee
Ilorin
Minna
Niamey (BEN)
Sokoto
Damboa
Dadinkowa
Itu
Gombe
Kano
Maiduguri
Kano
Effurun
Ikorodu
Ikorodu
Ikeja West
Ikeja West
Itire
Itire
Uyo
Gusau
Zaria
Katsina
Onitsha
Savannah
Talata-Mafara
Kano
Iwo
Ilesa Tee
Ondo
Sagamu
Ilupeju
Ilupeju
Otta
Otta
Oworonshoki
Oworonshoki
Maryland
Maryland
Sagamu Cements
Ilesa Tee
Oshogbo B
Ofa
Tension
dexploitation
[kV]
LIGNES - NIGERIA
Limite
thermique
[MVA]
Nom de la ligne
de
90
252
130
142
82
70
44
18
71
9
36
18
18
13
13
8
8
44
110
70
72
18
92
85
247
18
15
58
40
17
17
10
10
10
10
20
20
40
20
15
55
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
N/A
84.6
84.6
66.3
66.3
N/A
84
N/A
66.3
84.6
N/A
N/A
N/A
126
126
126
126
91
84.6
84.6
84.6
N/A
66.3
84.6
66
91
91
91
N/A
126
126
126
126
126
126
126
126
N/A
91
91
70
Longueur
[km]
Tension
dexploitation
[kV]
Limite
thermique
[MVA]
2
2
43
71
20
80
50
50
20
20
62
113
69
145
55
55
90
88
55
90
68
68
99
99
39
39
44
156
85
50
47
44
14
33
10
3
3
9
65
125
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
95.5
95.5
N/A
91
91
66.3
84.5
84.5
N/A
N/A
N/A
84.6
84.6
84.6
84.6
85
N/A
N/A
84.6
84.5
84.6
84.6
84.6
84.6
91
91
91
91
66.3
66.3
N/A
70
91.5
91
91.5
91
91
91
N/A
84.6
Ilupeju
Maryland
Ilupeju
Maryland
Irrua
Ukpilla
Iseyin
Iwo
Itu
Uyo
Iwo
Oshogbo A
Jos
Makeri
Jos
Makeri
Kaduna
Kaduna Town
Kaduna
Kaduna Town
Kaduna
Zaria
Kankia
Kano
Kankia
Katsina
Kano
Zaria
Katampe
Kubwa
Katampe
Suleija
Kontagora
Tegina
Kontagora
Yelwa
Kubwa
Suleija
Makeri
Pankshin
Minna
Shiroro
Minna
Shiroro
Minna
Suleija
Minna
Suleija
New Haven
Nkalagu
New Haven
Nkalagu
New Haven
Oji River
New Haven
Oturkpo
Numan
Savannah
Numan
Yola
Ofa
Omu-Aran
Ofa
Oshogbo B
Ogba
Otta
Okene
Ukpilla
Otta
Papalanto
P.H. Main
P.H. Town
P.H. Main
P.H. Town
Sagamu
Sagamu Cements
Shiroro
Tegina
Sokoto
Talata-Mafara
93/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Nom de la ligne
V1 (kV)
V2 (kV)
Aja
Aja
Ajaokuta
Ajaokuta
Ajaokuta
Akangba A
Akangba A
Akangba B
Akangba B
Akangba C
Alaoji
Alaoji
Ayede
Ayede
Benin
Benin
Birnin-Kebbi
Egbin
Egbin
Gombe
Gombe
Ikeja West
Ikeja West
Ikeja West
Ikeja West
Jebba T.S.
Jos
Kaduna
Kaduna
Kaduna
Kaduna
Kano
Kano
Katampe
Katampe
New Haven
New Haven
Onitsha
Onitsha
Oshogbo B
Oshogbo A
Oshogbo B
Shiroro
Shiroro
Aba
Aba
Aba
Aba
Aba
Abakaliki
Abakaliki
Abeokuta
Abeokuta
Abeokuta
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
33
6.6
33
33
33
33
33
33
33
33
TRANSFORMATEURS - NIGERIA
V3 (kV) Sn (MVA)
Sous-station
33
33
33
13.8
13.8
13.8
13.8
33
33
33
33
33
33
33
13.8
33
33
33
33
33
33
13.8
33
13.8
13.8
33
33
33
33
33
33
33
13.8
13.8
33
13.8
33
33
33
150
150
162
162
162
90
90
90
90
150
150
150
150
150
150
150
90
150
150
150
150
150
150
150
150
60
150
60
60
90
150
150
150
150
150
150
150
90
90
150
90
150
150
150
30
7.5
30
60
45
30
15
30
30
30
Abuja
Abuja
Abuja
Abuja Central
Abuja Central
Agbara
Agbara
Aja
Aja
Ajaokuta Town
Ajaokuta Town
Akangba A
Akangba B
Akoka
Akoka
Akoka
Akure
Akure
Akure
Akwanga
Alagbon
Alagbon
Alausa
Alausa
Alimosho
Alimosho
Alimosho
Amuwo-Odofin
Amuwo-Odofin
Apapa-Road
Apapa-Road
Apapa-Road
Ashaka Cements
Ashaka Cements
Awka
Awka
Ayede
Ayede
Ayede
Ayede
Bauchi
Bauchi
Bauchi
Benin
Benin
Benin
Bida
Bida
Birnin-Kebbi
Birnin-Kebbi
Birnin-Kebbi
Biu
Calabar
Calabar
V1 (kV)
V2 (kV)
V3 (kV)
Sn (MVA)
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
33
33
33
33
33
33
33
33
33
11
11
33
33
11
11
11
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
11
11
33
33
33
33
33
33
33
33
33
33
33
11
11
11
45
45
45
60
60
45
45
60
60
15
15
60
60
45
30
30
15
30
60
40
60
60
45
60
30
60
30
30
30
45
45
15
15
15
30
30
30
30
60
45
7.5
45
30
60
60
30
30
30
5
15
30
7.5
30
30
94/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
V1 (kV)
V2 (kV)
Calabar
Dakata
Dakata
Dakata
Damboa
Dan-Agundi
Dan-Agundi
Dan-Agundi
Delta
Delta
Effurun
Effurun
Effurun
Ejigbo
Ejigbo
Eket
Eket
Funtua
Funtua
Funtua
Gcm
Gombe
Gombe
Gusau
Gusau
Gusau
Gusau
Hadejia
Ibadan North
Ibadan North
Ife
Ife
Ijebu-Ode
Ijebu-Ode
Ijora
Ijora
Ijora
Ijora
Ikorodu
Ikorodu
Ilesa
Ilesa
Ilorin
Ilorin
Ilupeju
Ilupeju
Ilupeju
Ilupeju
Irrua
Irrua
Iseyin
Isolo
Isolo
Isolo
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
11
11
33
33
33
33
33
11
11
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
11
11
11
33
33
33
33
11
33
TRANSFORMATEURS - NIGERIA
V3 (kV) Sn (MVA)
Sous-station
60
30
60
30
30
60
30
60
30
30
30
60
60
30
30
45
45
5
7.5
30
15
15
15
15
30
7.5
7.5
15
40
40
30
30
30
30
30
30
45
30
60
60
30
30
60
30
15
25
15
30
30
60
45
30
15
30
Isolo
Isolo
Isolo
Itakpe
Itakpe
Itire
Itire
Itu
Jebba T.S.
Jericho
Jericho
Jos
Jos
Kaduna
Kaduna
Kaduna
Kaduna Town
Kaduna Town
Kaduna Town
Kaduna Town
Kaduna Town
Kankia
Kano
Kano
Kano
Katampe
Katampe
Katsina
Katsina
Katsina
Keffi
Kontagora
Kubwa
Maiduguri
Maiduguri
Maiduguri
Makeri
Makeri
Makurdi
Maryland
Maryland
Maryland
Minna
Minna
New Haven
New Haven
New Haven
Niamey
Nkalagu
Nkalagu
Ofa
Ogba
Ogba
Ogba
V1 (kV)
V2 (kV)
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
11
11
11
33
33
33
33
33
33
33
11
33
33
33
33
33
11
33
33
11
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
V3 (kV)
11
11
Sn (MVA)
15
15
15
30
30
30
40
15
30
30
15
60
60
30
60
30
15
30
30
15
60
75
30
40
30
60
60
7.5
30
30
30
30
40
45
45
15
15
15
40
30
40
30
30
30
30
30
60
30
30
30
60
60
30
95/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
V1 (kV)
V2 (kV)
Ogba
Ogba
Oji River
Oji River
Ojo
Ojo
Okene
Okene
Omu-Aran
Ondo
Ondo
Onitsha
Onitsha
Onitsha
Onitsha
Onitsha
Oshogbo B
Oshogbo B
Oshogbo B
Otta
Otta
Oturkpo
Oturkpo
Owerri
Owerri
Owerri
Oworonshoki
Oworonshoki
P.H. Main
P.H. Main
P.H. Main
P.H. Town
P.H. Town
P.H. Town
P.H. Town
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
33
11
66
66
33
33
33
33
33
33
33
33
11
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
33
11
33
TRANSFORMATEURS - NIGERIA
V3 (kV) Sn (MVA)
Sous-station
11
11
11
11
11
11
25
45
15
15
30
30
7.5
30
30
30
30
45
15
60
15
60
30
45
30
45
60
30
7.5
40
45
45
30
30
45
60
45
12.5
30
10
45
Pankshin
Papalanto
Papalanto
Papalanto
Potiskum
Potiskum
Sagamu
Sagamu
Sagamu Cements
Sagamu Cements
Savannah
Shiroro
Sokoto
Sokoto
Sokoto
Suleija
Suleija
Talata-Mafara
Tegina
Ukpilla
Ukpilla
Uyo
Uyo
Yandev
Yandev
Yandev
Yelwa
Yola
Yola
Yola
Zaria
Zaria
Zaria
Zaria
V1 (kV)
V2 (kV)
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
132
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
11
11
33
33
33
33
33
33
33
33
33
33
33
33
11
11
11
33
33
V3 (kV)
11
11
Sn (MVA)
15
15
15
30
30
30
30
30
15
15
15
30
30
30
30
7.5
7.5
30
30
15
7.5
40
40
15
15
45
30
30
30
15
15
15
45
40
96/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Sous-station
Alaoji
Benin
Gombe
Gombe
Ikeja West
Jebba T.S.
Jebba T.S.
Kaduna
Kaduna
Kaduna
Kano
Katampe
Oshogbo
Ajaokuta
Alaoji
Benin
Gombe
Gombe
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
ind.
330
330
330
330
330
330
330
330
330
330
330
330
330
132
33
33
33
33
75
75
50
50
75
75
75
75
30
30
75
75
75
30
30
30
30
30
4.2.
Interconnexions existantes
Le tableau ci-dessous synthtise les interconnexions existantes en HT (> 100kV).
Ligne dinterconnexion
de
Longeur
[km]
Tension
nom [kV]
Capacit
[MVA]
Interconnexion OMVS
Prestea (GHN)
Abobo (IC)
Akosombo (GHN)
Lome (TOG)
Akosombo (GHN)
Lome (TOG)
Ferkssdougou (IC)
Kodeni (BF)
Dapaong (TOG)
Bawku (GHN)
1200
220
128.7
128.7
221.8
65
Nangbto (TOG)
Mom Hagou (TOG)
Kara (TOG)
IKEJA WEST (NIG)
BIRNIN-KEBBI (NIG)
KATSINA (NIG)
80.3
54
58
75
252
72
Bohicon (BEN)
Avakpa (BEN)
Djougou (BEN)
SAKETE (BEN)
NIAMEY (NIGER)
GAZAOUA (NIGER)
225
225
161
161
225
161 (exploit
en 34.5kV)
161
161
161
330
132
132
250
327
128
128
327
182
120
105
120
686
84.6
84.6
97/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
4.2.1.
Interconnexions Zone B
La seule interconnexion haute tension existante de la zone B est la ligne OMVS
225kV qui interconnecte le site hydrolectrique de Manantali au Sngal, au Mali et
la Mauritanie. Cette ligne simple terne de 1200 kms dont 945 kms au Sngal a
une capacit maximale estime 150 MW mais en pratique le transit est limit 110
MW.
La capacit de cette interconnexion devrait permettre dvacuer la puissance
additionnelle du nouveau projet hydrolectrique en cours de construction : Flou
(60MW, mise en service prvue en 2013).
Ds la mise en service de site hydraulique de Gouina (projet candidat, mise en
service estime en 2017), il faudra ventuellement renforcer le rseau 225kV vers
Dakar si ncessaire.
4.2.2.
Interconnexions Zone A
Le Nigria et une partie du Bnin restent pour linstant non synchrones mme si les
interconnexions existent.
4.2.2.1.
98/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
4.2.2.2.
INTERCONNEXION 225KV
Une ligne 225kV mono-terne interconnecte la Cte dIvoire et le Burkina Faso
depuis 2009. Elle relie les postes de Ferkssdougou (IC) et Kodeni (BF).
Une ligne 225kV mono-terne interconnecte le Ghana et la Cte dIvoire entre les
postes dAbobo et Prestea (station intermdiaire Elubo au Ghana).
4.2.2.3.
INTERCONNEXIONS 161 KV
Le Ghana est interconnect avec le Togo via les lignes 161kV simple terne
suivantes :
Ghana Togo : 2 lignes entre Lome et Akosombo denviron 130 kms (dont une
passant par le poste intermdiaire de Asiekpe et lautre par le poste dAflao)
Ghana Togo : une ligne 161kV interconnecte le Nord des 2 pays. Cette ligne
exploite en 34.5kV relie Bawku et Dapoang.
Le Bnin est interconnect avec ses pays voisins avec les lignes 161kV simple terne
suivantes :
INTERCONNEXIONS 132 KV
Le Niger et le Nigeria sont synchrones et interconnects avec 2 lignes 132 kV :
4.3.
Une ligne de 250 kms connectant Birnin Kebbi (Nigeria) et Niamey (Niger) ;
Une ligne de 70 kms reliant Katsina (Nigeria) Gazaoua (Niger).
4.3.1.
99/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Les plans de maintenance du rseau de transport THT sont en gnral bien tablis et
respects. Il y a une gestion du stock des pices de rechange. Le problme principal
est le vol et le vandalisme sur le rseau. Les socits de transport de llectricit
tchent dy remdier en maintenant au mieux le rseau.
Globalement, les cbles trs haute tension sont peu soumis la pollution. Ce sont
des cbles ACSR ou AAAC avec une temprature maximale dexploitation de
lordre de 70C 75C. Les dfauts sont rares et fugitifs la plupart du temps.
Lutilisation exceptionnelle de cbles ASTER 228mm pour de la THT (225kV) doit
tre vu comme une erreur de conception car le diamtre est trop faible pour un tel
niveau de tension.
Les isolateurs sont en verre tremp arodynamique ou normal. Ltat des armements
est, en gnral, assez bon mme si, localement, de lusure a t dtecte.
Enfin, tant donn que le rseau THT de lAfrique de lOuest est trs rcent, peu de
rhabilitations sont envisages.
4.3.2.
100/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Selon les rgions, les plans de maintenance sont organiss et suivis ou, au contraire,
un peu plus dlicats. La principale difficult est la gestion du stock dans les pays o
la construction du rseau sest tale sur de nombreuses annes et o les
technologies utilises sont disparates.
Les rseaux HT sont relativement soumis la pollution. Cette pollution est de trois
types
101/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Figure 8 Pylnes simple terne et double terne (zone Cap des Biches - Sngal)
De plus, une surisolation est ralise dans les zones de pollution; surisolation
constate sur terrain au poste de Cap des Biches.
102/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
4.4.
Projets nationaux
Cette section prsente les lignes de transport qui seront dveloppes lintrieur des
pays. Ces projets sont propres aux pays et indpendants des projets EEEAO, OMVG
et OMVS.
La table ci-dessous dcrit ces lignes, leur date suppose de mise en service, leur
tension dexploitation, leur longueur et leur capacit thermique.
En labsence de donnes, des paramtres standards bass sur des lignes similaires
existantes ont t utiliss.
103/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Enfin, certaines rhabilitations sont envisages sur le niveau HT. Dans les lignes
rhabiliter il n'y a en gnral pas de problme de surcharge, mais une rhabilitation
ncessaire suite la vtust de ces lignes situes pour la plupart en zone de forte
pollution (marine ou poussires).
Gambia
Ghana
Ivory Coast
Mali
Niger
Nigeria
Togo/Benin
4.5.
104/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Pays
Burkina Faso
Longueur
service pressentie
(kV)
Thermique
N/A
225
Ouagadougou
Tambao
250
327
N/A
225
Brikama
Willengara
15
327
N/A
225
Willengara
Kotu
15
327
N/A
225
Willengara
Brufut
15
327
2013
330
Prestea
Kumasi
173
1000
2015
330
Kumasi
Kintampo
180
1000
2015
330
Domini
Prestea
91
1000
2015
330
Kintampo
Bolgatanga
287
1000
2016
330
Aboadze
Domini
120
1000
2019
330
Prestea
Kumasi
173
1000
2016
330
Domini
Prestea
91
1000
2012
225
Laboa
Ferke
285
327
2017
150
Koutiala
Mopti
100
N/A
N/A
132
Zinder
Diffa
410
84.6
N/A
132
Zinder
Tchirozerine
486
84.6
N/A
330
Makurdi
Jos
286
777
N/A
330
New Haven
Makurdi
245
777
N/A
330
New Haven
Ekpene
249
777
N/A
330
New Haven
Ekpene
249
777
N/A
330
Ekpene
Afam
150
777
N/A
330
Omoku
Onitsha
195
777
N/A
330
Abasi
Ekpene
78
777
N/A
330
Ajaokuta
Lokoja
250
777
2013
161
Onigbolo
Parakou
250
120
2016
161
Bembereke
Guene
180
120
2016
161
Guene
Malanville
40
120
2016
161
Guene
Dydyonga
100
120
2016
161
Kara
Dapaong
200
120
330/225 kV
330/161 kV
330/161 kV
330/132 kV
330/132 kV
330/132 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
330 kV
225/161 kV
225/161 kV
225/69 kV
225/69 kV
225/11 kV
225/11 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
225 kV
per km
per km
per km
per km
per km
per km
per km
per km
per km
per km
per km
per km
8.400
7.980
4.609
2.720
3.605
5.500
2.500
1.500
4.500
0.197
0.247
0.296
0.064
0.216
0.270
0.360
0.090
2.500
1.500
7.182
4.148
2.250
2.800
2.000
1.150
1.000
0.590
1.000
0.590
4.000
0.181
0.226
0.271
0.059
0.190
0.238
0.285
0.062
2.273
Table 77 Cots unitaires proposs pour les ouvrages de transport et de transformation (1/2)
105/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Assessed
price
MUSD
Equipment description
Assessed
price
MUSD
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
161 kV
GIS bay
AIS bay
GIS coupling
AIS coupling
opening site/general services
OHL 1c/1 364 MVA
OHL 1c/2 364 MVA
OHL 2c/2 2x364MVA
OHL 2d 364 MVA
OHL 1c/1 182 MVA 265 mm2
OHL 1c/2 182 MVA 265 mm2
OHL 2c/2 182 MVA 2x265 mm2
OHL 2d 182 MVA 265 mm2
132 kV
132 kV
132 kV
132 kV
132 kV
132 kV
132 kV
GIS bay
AIS conventional bay
opening site/general services
OHL 1c/1 Panther 250MVA 2*250mm2
OHL 1c/2 Panther 250MVA 2*250mm2
OHL 2c/2 Panther 250MVA 2*250mm2
OHL 2d Panther 250MVA 2*250mm2
per km
per km
per km
per km
0.855
0.504
3.600
0.150
0.173
0.231
0.052
capacitor shunt
Reactor shunt
SVC (static Var compensator)
per Mvar
per Mvar
per Mvar
0.007
0.030
0.072
per km
0.900
0.531
0.900
0.531
3.600
0.181
0.226
0.271
0.059
0.128
0.160
0.192
0.042
Table 78 Cots unitaires proposs pour les ouvrages de transport et de transformation (2/2)
106/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Equipment description
5.
5.1.
Objectifs poursuivis
Les objectifs poursuivis concernant les aspects financiers, lgaux et institutionnels
sont :
5.2.
Domaine dintervention
Rcolter pour chaque pays membre de l'EEEOA des donnes relatives :
107/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
5.3.
Approche suivie
Le premier volet de la mission consiste :
se rendre sur le terrain dans des pays slectionns qui ont men bien par le
pass des projets de transport transfrontalier et de production rgionale, et ce afin
d'tudier les approches dimplmentation adoptes pour les projets rgionaux et
leur efficacit ;
passer en revue les diffrentes dcisions prises et les lois additionnelles
adoptes par l'EEEOA et la CEDEAO en matire de dveloppement et
dimplmentation de projets afin de cerner les diffrences entre anciennes et
nouvelles approches ;
dterminer comment la nouvelle approche peut aplanir les difficults et
permettre au sein de l'EEEOA dattirer les investissements et acclrer
limplmentation de projets ;
valuer si la lgislation et la gouvernance dans les diffrents pays pourraient
avoir un impact sur l'adoption de cette nouvelle approche ;
formuler des recommandations adquates.
5.4.
5.4.1.
108/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
se rendre sur le terrain dans les pays membres slectionns pour rcolter des
donnes et de dbattre avec les actionnaires et les dcideurs rgionaux adquats ;
identifier les indicateurs de russite utiliss par les investisseurs potentiels dans
leur valuation de la viabilit financire des investissements dans le secteur de
lnergie (stabilit long terme, liquidits court terme, capacit du service de la
dette, etc.) ;
analyser les performances financires des socits dlectricit tout au long de
la conduite des projets prioritaires afin d'valuer le niveau des indicateurs de
russite ;
formuler des recommandations adquates.
Le second volet de la mission consiste :
volution tarifaire
Structure tarifaire
Sngal
Gambie
Guine-Bissau
Guine
Sierra Leone
Libria
Mali
Cte dIvoire
Ghana
Togo-Bnin
Burkina Faso
Niger
Nigria
109/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Pays membre de
l'EEEOA
Pays membre de
l'EEEOA
Guine
Guine-Bissau
Sierra Leone
Libria
Loi 541
Livre blanc relatif aux projets dans le cadre des objectifs du millnaire pour le
dveloppement
Sngal
Gambie
Mali
Ghana
Cte dIvoire
Togo-Bnin
Burkina Faso
110/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
5.4.2.
Nigria
Niger
5.4.3.
Rglementation 1999
Toutefois, des retards importants se sont accumuls dans l'excution de ces projets.
Les vastes pnuries en nergie perdurent ainsi dans la sous-rgion. Pour trouver une
solution ces problmes de pnuries, le secrtariat de l'EEEOA a d commander en
2006 l'tude d'un plan d'urgence pour la scurit de l'approvisionnement lectrique.
Les rsultats de cette tude ainsi que d'autres propositions visant acclrer
limplmentation des projets prioritaires de l'EEEOA ont t dbattus lors du 33 e
sommet des chefs d'tat et de Gouvernement de la CEDEAO, qui s'est tenu
Ouagadougou en janvier 2008. Ont t ratifies et adoptes cette occasion les Lois
additionnelles A/SA.3/01/08 et A/SA.4/01/08 instaurant la stratgie de
implmentation du systme d'changes d'nergie lectrique ouest-africain, ainsi que
les recommandations de l'tude pour un plan d'urgence pour la scurit de
l'approvisionnement en lectricit.
Les deux Lois additionnelles exigent que les projets lectriques rgionaux de
l'EEEOA soient mis en uvre selon le modle deSocit But Unique (specific
purpose company ou SPC). En termes d'approche, limplmentation d'un projet
implique la cration d'une entit rgionale distincte dans le cadre d'un partenariat
public-priv. Cette entit possdera et grera tous les actifs ncessaires au projet
rgional. Cette mme approche a t utilise lors de la mise en uvre du projet
hydrolectrique de Manantali par l'OMVS-SOGEM, bnficiant au Mali, au Sngal
et la Mauritanie.
5.4.4.
Autres documents
Mentionnons trois autres documents pertinents notre disposition : le rapport final
d'tude du plan d'urgence pour la scurit de l'approvisionnement en lectricit du
bureau Arthur Energy Advisors, un article intitul "Understanding the Regional
Environment; Challenges of the WAPP SPC" ainsi que le rapport "The Diagnostic
Report on Institutional and regulatory Frameworks of ECOWAS Member
Countries".
111/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
5.5.1.
5.5.1.1.
Ce premier module exploite les travaux raliss par les tudes conomiques et
techniques afin de quantifier l'offre et la demande d'nergie dans les diffrents pays.
112/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
5.5.
5.5.1.3.
Cot du projet
Prvision de la demande en nergie
Retards possibles dans la mise en uvre du projet
Politique nationale de scurit nergtique
Cot de l'approvisionnement en nergie (tout particulirement en combustibles)
Taux d'actualisation
Tarifs de l'lectricit
113/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Guine Bissau
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
6.
ANNEXE ZONES FORT POTENTIEL OLIEN
PAR PAYS
Sngal et Gambie
114/167
Sierra Leone
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Guine
115/167
Mali
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Libria
116/167
Ghana
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Cte dIvoire
117/167
Burkina Faso
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Togo et Benin
118/167
Niger
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Nigria
119/167
7.
120/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
121/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
122/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
123/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
124/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
8.
ANNEXE: ETUDE DE STABILITE: MODELE PSA
POUR LANNEE 2025, POINTE DE CHARGE
8.1.1.
Noeuds
125/167
Pays
Zone
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
Tension
kV
225
225
225
225
225
225
225
225
225
225
225
225
225
225
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
30
15
15
15
15
15
15
15
15
11
11
11
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
Sous-station
Nom
SENDOU3G
MAURIT03
SOMA__03
BRIKAM03
BRIKAM1G
MANSOA03
BISSAU03
BAMBAD03
SALTHI03
BISSAU1G
LINSAN03
NZEREK03
FOMI__03
BOKE__03
KALETA03
LABE__03
MALI__03
SAMBAG03
BEYLA_03
KANKAN03
KOROUS03
DABOLA03
SIGUIR03
AMARYA03
MATOTO03
KOUKOU03
BOUREY03
DONKEA07
GARAFI07
GRCHUT07
MATOTO07
LINSAN07
MAMOU_07
KINDIA07
GRCHUT_D
MATOTO_D
MANEAH_D
SONFON_D
YESSOU_D
NZEREK_D
TOMBO__D
BANEAH_D
DONKEA_D
SAMBANG1
SAMBANG2
SAMBANG3
SAMBANG4
TB5G3
TB5G1
TB5G2
MANEAHG1
MANEAHG2
MANEAHG3
KALETAG1
KALETAG2
KALETAG3
126/167
Pays
Zone
SE
MT
GA
GA
GA
GB
GB
GB
GB
GB
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
SE
MT
GA
GA
GA
GB
GB
GB
GB
GB
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
Tension
kV
6.6
225
225
225
30
225
225
225
225
30
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
110
110
110
110
110
110
110
60
60
60
60
60
33
20
15
15
13.2
13.2
13.2
13.2
11
11
11
11
11
11
10.3
10.3
10.3
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
TOBENE03
KAOLAC03
TOUBA_03
KAHO1_03
KAHO2_03
DAGANA03
MATAM_03
SAKAL_03
TAMBAC03
TANAF_03
KOUNOU03
ZIGUIN03
SENDOU03
MBOUR_03
THIONA08
TOBENE08
HANN__08
BELAIR08
CAPEBI08
KOUNOU08
MBAO__08
SOCOCI08
GTIIPP08
MECKHE08
MATAM_08
SIBA__08
SOMETA08
FICT1_08
FICT2_08
UNIVER08
AEROPO08
PATTED08
TAIBA_08
SAKAL_10
KAHONE1G
KAHONE2G
BELAIR11
KOUNOU11
TAMBAC11
DAGANA11
CAPEB11G
TAMBAC12
BELAIR1G
CAPEBI1G
GTI___1G
CAPEBI2G
CAPEBI3G
CAPEBI4G
CAPEBI5G
CAPEBI6G
CAPEBI7G
CAPEBI8G
CAPEBI9G
CAPEB10G
SENDOU1G
SENDOU2G
Pays
Zone
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
Tension
kV
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
6.3
6.3
6.3
6.3
6.3
6.3
5.65
5.65
5.65
5.5
5.5
3.3
3.3
3.15
3.15
225
225
225
225
225
225
225
225
225
225
150
150
150
150
150
150
150
150
Sous-station
Nom
KENIE_05
BALING10
BALI1_11
BALI2_11
MANANT1G
MANANT2G
MANANT3G
MANANT4G
MANANT5G
DARSATAC
FELOU_1G
FELOU_2G
FELOU_3G
ALBATR1G
GOUINA1G
GOUINA2G
GOUINA3G
BADOUMG1
BADOUMG2
SELING1G
SOPAM_1G
KENIE_1G
KENIE_2G
KENIE_3G
SIKASSO1
KOUTIA1G
VICABO1G
KOUTIA2G
BALING1G
BALING2G
BALING3G
BALING4G
DARSAL1G
DARSAL5G
DARSAL6G
DARSAL7G
SOTU1_1G
NIONO_1G
BOUGO_1G
SOSUMA1G
MARKALAG
DARSAL8G
KAMAKW03
KENEMA03
BUMBUN03
YIBEN_03
BIKONG03
BUMBUN04
FRTOWN04
KAMAKW_D
KENEMA_D
YIBEN__D
BIKONG_D
BUMBU1G1
BUMBU1G2
BUMBUN2G
127/167
Pays
Zone
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
Tension
kV
150
30
15
15
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
8.66
8.66
8.66
8.66
8.66
8.66
8.66
8.66
8.66
6.6
6.6
6.6
6.6
5.5
5.5
5.5
5.5
2
2
2
2
2
0.4
225
225
225
225
225
161
161
33
33
33
33
13.8
13.8
13.8
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
FOMI__G1
FOMI__G2
FOMI__G3
DIGAN__G
AMARYAG1
AMARYAG2
AMARYAG3
AMARYAG4
KASSAB_G
LAFOU__G
GOZOGUEG
BONKONDG
FRANKO_G
POUDADLG
BALASSAG
KOUKOUTG
BOUREYAG
DIAREGUG
NZEBELAG
KOURAVEG
KOUYA__G
FETORE_G
GRKINKOG
TB3G1
TB3G2
TB3G4
TB3G3
DONKEAG2
DONKEAG1
GARAFIG1
GARAFIG2
GARAFIG3
GRCHUTG3
GRCHUTG4
GRCHUTG2
GRCHUTG1
BANEAHG1
BANEAHG2
MANANT03
TKITA_03
KODIAL03
KAYES_03
KOUTIA03
SIKASS03
SEGOU_03
OULESS03
SELING03
BADOUM03
FANA__05
SEGOU_05
KALABA05
SIRAKO05
KODIAL05
LAFIA_05
SELING05
BALING05
Pays
Zone
SL
SL
SL
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
SL
SL
SL
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
Tension
kV
10.3
10.3
10.3
225
225
225
225
225
66
33
33
33
33
10.5
10.5
10.5
10.5
10.5
10.5
10.3
10.3
10.3
10.3
10.3
10.3
330
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Sous-station
Nom
2041KOSS
2330ZUEN
2300SERE
2250YAMO
2260DIMB
2270ATAK
2280ABEN
2290AGNE
2031TAAB
2120AGBO
2320GAGN
2310DIVO
2011ABOB
2150PLAT
2160BIAN
2140BONG
2170AYAM
2240TREI
2180AYAM
2220BIAS
2021VRID
2210RIVI
2200BASS
2190ABRO
2081PEDR
20FAYE90
200SIR90
2000HIRE
2231YOPO
2130DABO
2230YOPO
2044KOSS
2043KOSS
2042KOSS
2501AZI
2502AZI
2NEWCC-1
2NEWCC-2
20NGTAG8
2027VRID
2028VRID
2029VRID
20NTAG82
20NTAG83
2032TAAB
2033TAAB
2034TAAB
2023VGT2022VGT2024VRID
2025VRID
2026VRID
2093BUYO
2094BUYO
2092BUYO
SOUBREG1
128/167
Pays
Zone
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
Tension
kV
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
17
17
17
15.75
15.75
15.75
15.75
15
15
15
15
15
15
13.8
13.8
13.8
11
11
11
11
11
10.5
10.5
10.5
10.5
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
BENKONGG
BUMBUN3G
BUMBU45G
MONROV03
YEKEPA03
MANO__03
BUCHAN03
STPAUL03
MONROV09
YEKEPA_D
BUCHAN_D
MONROV_D
MANO___D
MTCOFFG1
MTCOFFG2
MTCOFFG3
BUCHANG1
BUCHANG2
MTCOFFG4
MANORIG1
MANORIG2
SPAULG11
SPAULG12
SPAULG21
SPAULG22
RIVIER02
2060FERK
2100MAN2090BUYO
2070SOUB
2050BOUA
2040KOSS
2030TAAB
2010ABOB
2500AZIT
2020VRID
2209RIVI
2110LABO
2080S-PE
2229YOPO
2371BUND
TIBOTO03
2061FERK
2360KORH
2370BUND
2380ODIE
2111LABO
2390SEGU
2101MAN2400DANA
2071SUBR
2091BUYO
2410DALO
2340BOUA
2350MARA
2051BOUA
Pays
Zone
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
Tension
kV
10.5
10.5
10.5
10.5
10.5
10.5
10.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
330
225
225
225
225
132
132
132
132
90
90
90
90
90
90
90
34.5
34.5
33
33
33
33
33
33
33
33
33
33
33
15
15
15
15
15
11
11
11
11
11
11
11
11
Sous-station
Nom
KOMSILG4
KOMSILG3
KOMSILG2
KOMSILG1
BOB2_2G1
BOB2_2G2
4BAGRE_6
4KOMPI_6
4OUA11_6
4OUA12_6
4BOB11_5
4BOB12_5
4BOB13_5
4BOB14_5
4BOB21_5
4BOB22_5
4BOB23_5
4BOB24_5
4BOB25_5
4OUA13_6
4OUA21_5
4OUA22_5
4OUA23_5
4OUA24_5
4OUA25_5
SMALLHYD
1029VOLT
ABOA_330
1591KIN3
BOLGA330
PRES330
KSI330
1758BON3
1700ASO2
1115DUNK
1560A4BS
CAPE330
1109PRES
1809ELUB
12951BOL
1010AKOS
1020VOLT
1031SMEL
1032SMEL
1033SMEL
1034SMEL
1035SMEL
1036SMEL
1040TEMA
1050ACHI
1060WINN
1070C-CO
1080TAKO
1090TARK
1100PRES
1110DUNK
129/167
Pays
Zone
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Tension
kV
11
11
11
11
11
11
6.6
6.6
6.3
6.3
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
0.4
330
330
330
330
330
330
330
330
330
330
330
225
225
225
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
SOUBREG2
SOUBREG3
BOUTOUBG
GRIBOPOG
TIBOTOG1
TIBOTOG2
TIBOTOG3
2172AYAM
2181AYAM
2171AYAM
2182AYAM
ABOCOMG1
ABOCOMG2
ABOCOMG3
OUAGAE02
4KODE225
4_PA_225
4ZAGT225
OUAGAE03
4BAGR132
4KOMP132
4PTDO132
4ZANO132
4KOSSO90
4OUAG190
4OUAG290
4_PC_090
4ZAGTO90
OUAGAE08
PATDOI08
4ZAGTO34
4ZAGTO35
4KODEN33
4BOB1_33
4BOB2_33
4KOMSI33
4KOSSO33
4KOUA_33
4OUAG333
4OUAG133
4OUAG233
4PTDOI33
4ZAGTO33
4BOB1_15
4BOB2_15
4KOSSO15
4OUAG115
4OUAG215
4KOS1_11
4KOS2_11
4KOS3_11
4KOS4_11
4KOS5_11
4KOS6_11
KOMSILG5
KOMSILG6
Pays
Zone
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Tension
kV
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
Sous-station
Nom
1221ASIE
1230HO
1240KPEV
1250KPAN
1255KADJ
1310SOGA
1103APRE
1103BPRE
1241KPEV
1251KPAN
1311SOGA
1341WA
1351YEND
1361ESSI
1381SAWL
13091WEX
1291BOLG
1481Z-LV
1279MIM
1041T-LV
1042T-LV
1051ACH
1052ACH
1053ACH
1054ACH
1055ACH
1061AWIN
1061BWIN
1071BCCO
1072C-CO
1081TAKO
1082TAKO
1092ATAR
1092BTAR
1111DUNK
1131KUMA
1132KUMA
1133KUM1
1133KUM2
1151TAF0
1152TAFO
1161AKWA
1162AKWA
1171KPON
1181AKON
1181BKON
1201ASAW
1202ASAW
1261TECH
1271SUNY
1281ATAM
1281BTAM
1301BOGO
1371MALL
1391DCEM
1327ABOA
130/167
Pays
Zone
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Tension
kV
69
69
69
69
69
69
55
55
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
1120OBUA
1130KUMA
1140NKAW
1150TAFO
1160AKWA
1170KPON
1180KONO
1190KPON
1200ASAW
1210N-OB
1220ASIE
1280TAMA
1300BOGO
1320ABOA
1360ESSI
1370MALL
1390DCEM
1392 AFT
1600OPB1800ELUB
1470TT1P
1260TECH
1270SUNY
1350YEND
1380SAWL
1290BOLG
1413KENY
1309WEXF
1095NEWT
1700ASOG
1900TESI
1138T261
1138T262
1480ZEB
1139K2BS
1500BUI
1901TES2
1610BUIP
1590KIN
15533BSP
1278MIM
1580N_AB
1750BONY
1990AYAN
1630HAN
1340WA
1620TUMU
1850ATEB
1252KPAN
1210JUAB
1021SME2
1070CCO3
BAWKU_04
1561A4BS
1850BERE
1870CAPE
Pays
Zone
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Tension
kV
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
Sous-station
Nom
1701ASO6
ABOA3CC1
1758G
1757G
1473TT1P
1326ABOA
SASO2CC1
SASO2CC2
HEMANGG
PWALUGUG
JUALE__G
BTPP__G1
CEMPOWEG
SASOCC3
1102APRE
1102BPRE
1102CPRE
1222ASIA
1222ASIB
1231HO-1
10951NTA
1292BOLG
1071ACCO
1073C-CO
1121AOBU
1121BOBU
1121COBU
1141NKAW
1163AKWA
1195KPON
1211ANOB
1211BNOB
1211CNOB
1272SUNY
1273SUNY
1017AKOS
1294BOLG
1998AYAN
1164AKWA
1995AYAN
1412KENY
1581N-AB
1414KENY
1040TGEN
1101APRE
1101BPRE
1142NKAW
1122AOBU
1122BOBU
1122COBU
1212ANOB
1212BNOB
1212CNOB
MALANV02
SAKETE02
3030COTO
131/167
Pays
Zone
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
TB
TB
TB
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
BN
BN
BN
Tension
kV
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.2
13.2
13.2
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11
11
11
11
6.63
6.63
6.63
6.6
6.6
6.6
6.6
6.6
6.6
330
330
161
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
11391K2L
11392K2L
1143NKAW
1293BOLG
1511BUIL
15543BLV
15553BLV
1591KIN
1611BUIP
17501BON
1621TUMU
1631HAN
1852ATEB
1372MALL
1022SM2L
1211DNOB
1211JUAB
1282ATAM
1562A4BS
1851BERL
1871CAPL
1011AKOS
1012AKOS
1013AKOS
1014AKOS
1015AKOS
1016AKOS
1501G1
1502G2
1503G3
1191KPON
1192KPON
1193KPON
1194KPON
1321ABOA
1322ABOA
1323ABOA
1324ABOA
1325ABOA
10311VAL
10312VAL
10313VAL
10314VAL
10315VAL
10316VAL
10317VAL
10318VAL
1601OPB1602OPB1471TT1P
1472TT1P
1701ASO5
1701ASO1
1701ASO2
1701ASO3
1701ASO4
Pays
Zone
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
TO
Tension
kV
161
161
161
161
161
161
161
161
161
161
161
161
161
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
330
161
161
161
161
161
161
161
161
161
15
15
15
15
15
15
15
11
11
10.3
10.3
10.3
10.3
10.3
Sous-station
Nom
ADJARAG3
GAZAOU06
MARADI06
ZINDER06
DIFFA_02
ZABORI02
NIAMRD02
SALKAD02
DOSSO02
NIAM2_06
NIAM2C06
DOSSO_06
FRONT_06
NIAMRD06
SALKAD06
KANDAD06
NIAM22_D
NIAM21_D
NIAM2C_D
GOUDELG1
GOUDELG2
GOUDELG3
GOUDELG4
DYODYONG
KANDADG1
KANDADG2
KANDADG3
KANDADG4
SALKAD_G
SALKADG2
SALKADG3
MAMBIL01
JALING01
GOMBE_01
GOMBE_02
JOS___02
YOLA__02
DAMATU02
MAIDUG02
JALING02
MAMBIL02
MAMBIG01
MAMBIG02
MAMBIG03
MAMBIG04
MAMBIG05
MAMBIG06
MAMBIG07
MAMBIG08
AJAOKU01
BENINN01
AJAOKU02
ALADJA02
BENINC02
DELTA_02
SAPELE02
132/167
Pays
Zone
TB
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
TO
CE
CE
CE
EA
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BE
BE
BE
BE
BE
BE
BE
Tension
kV
10.3
132
132
132
330
330
330
330
330
132
132
132
132
132
132
132
20
20
20
20
20
20
20
20
20
20
20
20
10.5
10.5
10.5
760
760
760
330
330
330
330
330
330
330
15
15
15
15
15
15
15
15
760
760
330
330
330
330
330
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
3BOHI161
3050ONIG
3040SAKA
3DJOU161
PARAKO04
MA_GLE04
AVA___04
TANZOU04
BEMBER04
KANDI_04
GUENE_04
MALANV04
NATITI04
AKPAKP1G
NATITI1G
PORTON1G
PARAKO1G
CAI___1G
CAI___2G
CAI___3G
CAI___4G
CAI___5G
CAI___6G
CAI___7G
CAI___8G
IPPSOL1G
IPPTHE1G
SOLBEN1G
ADFSOL1G
MA_GLE1G
MA_GLE2G
MA_GLE3G
30101LOM
3010LOME
3020MOME
3060NANG
3ATAK161
3LOME161
3KARA161
DAPAON04
MANGO_04
ADJARA04
CONTOU1G
LOME__1G
KARA__1G
SOLTOG1G
CCTOGOG1
CCTOGOG2
CCTOGOG3
3NGLOG12
3NEWIPP
3061NANG
3062NANG
KETOU__G
ADJARAG1
ADJARAG2
Pays
Zone
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
EN
EN
EN
EN
Tension
kV
330
330
330
330
132
15.75
15.75
15.75
15.75
15.75
15.75
15.75
15.75
15.75
15.75
15.75
15.75
15
15
15
15
15
15
15
15
15
15
15
15
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
10.5
10.5
10.5
10.5
1
760
760
330
330
Sous-station
Nom
CALABA02
KWALE_02
NEWHAV02
ONITSH02
OWERRI02
MAKURD06
PORTHA02
EGBEMA02
OMOKU_02
NEWHAS02
ALIADE02
IKOTEK02
IKOTAB02
AHOADA02
YENAGO02
GBARAN02
NNEWI_02
IKOTAB06
OMOKU_06
GBARAN06
ALAOCCG1
ALAOCCG2
ETHIOPG1
ETHIOPG2
ETHIOPG3
ETHIOPG4
KWALCC1
KWALCC2
KWALCC3
AFAMGT19
AFAMGT20
IBOMGT03
AFAM6GT1
AFAM6GT2
AFAM6GT3
AFAM6GT4
AFAM6GT5
CALABGT2
CALABGT3
CALABGT4
CALABGT5
CALABGT1
EGBEMGT1
EGBEMGT2
EGBEMGT3
ALAOJGT1
ALAOJGT2
ALAOJGT3
ALAOJGT4
GBARAGT1
GBARAGT2
IKOTAGT1
IKOTAGT2
IKOTAGT3
ALSCOGT1
ALSCOGT2
133/167
Pays
Zone
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Tension
kV
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
132
132
132
17
17
17
17
17
17
15.75
15.75
15.75
15.75
15.75
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
OMOTOS02
BENINN02
GEREGU02
EYAEN_02
DELTA_06
SAPELST1
SAPELST2
SAPELST3
SAPELST4
SAPELST5
SAPELST6
GEREGGT1
GEREGGT2
GEREGGT3
GEREGGT4
GEREGGT5
GEREGGT6
OMOT2GT1
OMOT2GT2
OMOT2GT3
OMOT2GT4
EYAENGT1
EYAENGT3
EYAENGT4
EYAENGT2
SAPELGT4
SAPELGT2
SAPELGT3
SAPELGT1
DELTAG03
DELTAG04
DELTAG05
DELTAG06
DELTAG07
DELTAG08
DELTAG09
DELTAG10
DELTAG11
DELTAG12
DELTAG13
DELTAG14
DELTAG15
DELTAG16
DELTAG17
DELTAG18
DELTAG19
DELTAG20
OMOTGT12
OMOTGT34
OMOTGT56
OMOTGT78
DELTT1
MAKURD01
EGBEMA01
AFAM__02
ALAOJI02
Pays
Zone
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
KD
KD
KD
KD
KD
KD
KD
KD
KD
KD
KD
KD
Tension
kV
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
10.5
10.5
1
1
1
1
1
1
760
760
330
330
330
330
330
132
132
132
1
1
Sous-station
Nom
OSHOGB01
ERUNKA01
AIYEDE02
AJA___02
AKANGB02
EGBIN_02
IKEJAW02
OSHOGB02
ERUNKA02
GANMO_02
ALAGBO02
PAPALA02
EPE___02
EGBIN_06
EGBINST1
EGBINST2
EGBINST3
EGBINST4
EGBINST5
EGBINST6
CHEVROG1
CHEVROG2
CHEVROG3
PAPA2GT4
PAPA2GT2
PAPA2GT3
PAPA2GT1
EGBINGT1
EGBINGT2
EGBINGT3
EGBINGT4
EGBINGT5
EGBINGT6
EGBINGT7
EGBINGT8
EGBINGT9
PAPAGT12
PAPAGT34
PAPAGT56
PAPAGT78
EGBINT1
EGBINT2
ABUJA_01
BIRNIN02
JEBBA_02
JEBBAP02
KAINJI02
KATAMP02
SHIROR02
GWAGWA02
LOKOJA02
SOKOTO02
ZUNGER02
BIRNIN06
JEBBGH1
JEBBGH2
134/167
Pays
Zone
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
LA
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
Tension
kV
760
760
330
330
330
330
330
330
330
330
330
330
330
132
16
16
16
16
16
16
16
16
16
15
15
15
15
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
1
1
760
330
330
330
330
330
330
330
330
330
330
132
16
16
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Sous-station
Nom
ALSCOGT3
ALSCOGT4
ALSCOGT5
ALSCOGT6
OMOKUGT2
OMOKUGT1
ICSPOWG1
ICSPOWG2
ICSPOWG3
ICSPOWG4
ICSPOWG5
ICSPOWG6
BONMOBG1
BONMOBG2
BONMOBG3
TOTALFG1
TOTALFG2
TOTALFG3
TOTALFG4
WESTCOG1
WESTCOG2
WESTCOG3
WESTCOG4
IBOMP2G4
IBOMP2G3
IBOMP2G2
IBOMP2G1
FARMELEG
IBOMGT01
IBOMGT02
AFAMGT15
AFAMGT16
AFAMGT17
AFAMGT18
OMOKURG1
OMOKURG2
AFAMGT13
AFAMGT14
IKOTABT1
OMOKU_T1
GBARANT1
IKOTABT2
GBARANT2
IKOTABT3
KADUNA01
KANO__01
KADUNA02
KANO__02
KATSIN02
GUSAU_02
ZARIA_02
KANKIA06
KATSIN06
KANO__06
KANOT1A
KATSINT1
Sous-station
Nom
JEBBGH3
JEBBGH4
JEBBGH5
JEBBGH6
KAING05
KAING06
KAING07
KAING08
KAING09
KAING10
KAING11
Zone
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
Tension
kV
16
16
16
16
16
16
16
16
16
16
16
Sous-station
Nom
KAING12
SHIRGH1
SHIRGH2
SHIRGH3
SHIRGH4
ZUNGERG1
ZUNGERG2
ZUNGERG3
ZUNGERG4
BIRNT1
Pays
Zone
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
Tension
kV
16
15.65
15.65
15.65
15.65
15.65
15.65
15.65
15.65
1
Charges
Charge
Nom
MBOUR_03
THIONA08
TAIBA_08
TOBENE08
KAOLAC03
TOUBA_03
DAGANA03
MATAM_08
SAKAL_10
AEROPORT
HANN__08
BELAIR08
CAPEBI08
MBAO__08
MECKHE08
SIBA__08
SOMETA08
UNIVERSI
ZIGUIN03
SOCOCI08
TANAF_03
TAMBAC03
MAURITA1
SOMA__03
BRIKAM_D
MANSOA03
BAMBAD03
SALTHI03
BISSAU03
KINDIA07
MAMOU_07
BANEAH_D
DONKEA07
MATOTO_D
Noeud
Nom
MBOUR_03
THIONA08
TAIBA_08
TOBENE08
KAOLAC03
TOUBA_03
DAGANA03
MATAM_08
SAKAL_10
AEROPO08
HANN__08
BELAIR08
CAPEBI08
MBAO__08
MECKHE08
SIBA__08
SOMETA08
UNIVER08
ZIGUIN03
SOCOCI08
TANAF_03
TAMBAC03
MAURIT03
SOMA__03
BRIKAM1G
MANSOA03
BAMBAD03
SALTHI03
BISSAU1G
KINDIA07
MAMOU_07
BANEAH_D
DONKEA07
MATOTO_D
Pays
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
MT
GA
GA
GB
GB
GB
GB
GU
GU
GU
GU
GU
P active
MW
46.8
61.7
40
86.3
64.4
75.2
20.5
30.5
66.9
42.7
143.7
150.6
108.5
51.3
8.5
8.5
8.5
59
31.9
2.8
12.6
51.3
48
17.3
145.7
4
4
4
105
12
21
5
6
167
Q reactive
Mvar
22.7
29.9
19.4
41.8
31.2
36.4
9.9
14.8
32.4
20.7
69.6
72.9
52.5
24.8
4.1
4.1
4.1
28.6
15.4
1.4
6.1
24.8
23.2
8.4
70.6
1.9
1.9
1.9
50.9
5.8
10.2
2.4
2.9
80.9
135/167
Charge
Nom
TOMBO__D
MANEAH_D
SONFON_D
GARAFI07
GRCHUT_D
NZEREK_D
BALI1_11
BALKOU15
KOULIK15
FANA__15
FANA__30
KALAB_15
DIAMOU33
SADIOL33
KOUTI_33
LAFIA_15
LAFIA_30
LOULO
TABAKOTO
SEGO1_15
SEGO2_15
KALANA_6
SELING33
YANFOL33
SIKASS33
SIKASS03
SIRAK_15
TKITA_15
BALI1_30
TIENFA30
BADA1_15
BADA2_15
DARS1_15
DARS2_15
Noeud
Nom
TOMBO__D
MANEAH_D
SONFON_D
GARAFI07
GRCHUT_D
NZEREK_D
BALI1_11
BALING05
BALING05
FANA__05
FANA__05
KALABA05
KAYES_03
KAYES_03
KOUTIA03
LAFIA_05
LAFIA_05
TKITA_03
MANANT03
SEGOU_05
SEGOU_05
SELING05
SELING05
SELING05
SIKASS03
SIKASS03
SIRAKO05
TKITA_03
BALING10
BALING10
BALING10
LAFIA_05
BALING10
LAFIA_05
Pays
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
P active
MW
89
50
35
5
10
5
79.4
21
12.9
2.5
3.3
46.4
11.5
39
21.1
44.5
29.6
61.3
26.7
14.4
14.4
3.5
4
3.8
21.1
47.9
28.7
3.6
8.5
12.7
21.3
21.3
25.1
25.1
Q reactive
Mvar
43.1
24.2
17
2.4
4.8
2.4
38.5
10.2
6.2
1.2
1.6
22.5
5.6
18.9
10.2
21.6
14.3
29.7
12.9
7
7
1.7
1.9
1.8
10.2
23.2
13.9
1.7
4.1
6.2
10.3
10.3
12.2
12.2
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
8.2.
Pays
Noeud
Nom
KAYES_03
BALING10
BALING10
KAMAKW_D
YIBEN__D
BIKONG_D
KENEMA_D
BUMBUN04
FRTOWN04
YEKEPA_D
BUCHAN_D
MONROV_D
MANO___D
2061FERK
2360KORH
2370BUND
2380ODIE
2111LABO
2390SEGU
2101MAN2400DANA
2071SUBR
2091BUYO
2410DALO
2340BOUA
2350MARA
2051BOUA
2041KOSS
2330ZUEN
2300SERE
2250YAMO
2260DIMB
2270ATAK
2280ABEN
2290AGNE
2031TAAB
2120AGBO
2320GAGN
2310DIVO
2150PLAT
2160BIAN
2140BONG
2240TREI
2180AYAM
2220BIAS
2021VRID
2210RIVI
2200BASS
2190ABRO
2081PEDR
200SIR90
20FAYE90
2130DABO
2011ABOB
2230YOPO
2231YOPO
2000HIRE
4BAGR132
4_PA_225
4KOSSO90
4OUAG190
4OUAG290
4ZAGTO90
4KOMP132
4PTDOI33
4OUAG333
4BOB1_33
4BOB2_33
4ZAGTO33
4KODEN33
4ZAGTO34
1017AKOS
1022SM2L
10311VAL
10312VAL
10313VAL
10314VAL
10315VAL
10316VAL
10317VAL
10318VAL
Pays
MA
MA
MA
SL
SL
SL
SL
SL
SL
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
P active
MW
18.7
9.8
9.8
4
4
4
12
20
173
9
6
74
4
59.9
32.6
17.3
8.8
11.7
20.1
37.4
19
16.7
3.1
46.2
23
6.2
81.8
23.5
10.8
10.2
35.7
10.4
25.2
12.5
15.7
14.7
35.7
38
36.2
54.6
136.6
12.6
118.6
8.5
294
112.5
79.4
10.4
20.7
55
0
0
28.5
226
268.7
46.6
16.7
2.5
31.7
45.9
125.3
101.3
27
1.6
53.2
4.1
44.7
35.4
3.6
16.9
1.1
9.9
29.4
0
121.7
121.7
121.7
0
0
0
0
Q reactive
Mvar
9.1
4.7
4.7
1.9
1.9
1.9
5.8
9.7
83.8
4.4
2.9
35.8
1.9
29
15.8
8.4
4.3
5.7
9.7
18.1
9.2
8.1
1.5
22.4
11.1
3
39.6
11.4
5.2
4.9
17.3
5
12.2
6.1
7.6
7.1
17.3
18.4
17.5
26.4
66.2
6.1
57.4
4.1
142.4
54.5
38.5
5
10
26.6
0
0
13.8
109.5
130.1
22.6
8.1
1.2
15.4
22.2
60.7
49.1
11.5
0.8
25.8
2
21.6
17.1
1.7
8.2
0.5
4.8
14.2
0
58.9
58.9
58.9
0
0
0
0
136/167
Charge
Nom
1041-1
1042-1
1051-1
1052-1
1053-1
1054-1
1055-1
1061-A
1061-B
1071-B
1072-2
1081-1
1082-1
1092-A
1092-B
10951-1
1101-2
1101-1
1102-2
1111-1
1121-1
1121-2
1121-3
1122-1
1122-2
1122-3
1211-1
1211-2
1211-3
1211-4
1131-1
1132-2
1133-1
1133-2
11391
11392
1143
1151-1
1152-2
1161-1
1162-2
1171-1
1181-A
1181-B
1195-1
1201-1
1202-2
1222-1
1231-1
1241-1
1251-1
1261-1
1271-1
1272-1
1279-1
1281-A
1281-B
1290_1
1290_2
1293
1294
1301-1
13091-1
1311-1
1327-1
1341-1
13511
1361-1
1371-1
13811
1391-1
1412-1
1481-1
1511
15543
15553
1581-1
1591
1611
1621
1631
Noeud
Nom
1041T-LV
1042T-LV
1051ACH
1052ACH
1053ACH
1054ACH
1055ACH
1061AWIN
1061BWIN
1071BCCO
1072C-CO
1081TAKO
1082TAKO
1092ATAR
1092BTAR
10951NTA
1101APRE
1101BPRE
1102APRE
1111DUNK
1121AOBU
1121BOBU
1121COBU
1122AOBU
1122BOBU
1122COBU
1211ANOB
1211BNOB
1211CNOB
1211DNOB
1131KUMA
1132KUMA
1133KUM1
1133KUM2
11391K2L
11392K2L
1143NKAW
1151TAF0
1152TAFO
1161AKWA
1162AKWA
1171KPON
1181AKON
1181BKON
1195KPON
1201ASAW
1202ASAW
1221ASIE
1231HO-1
1241KPEV
1251KPAN
1261TECH
1271SUNY
1272SUNY
1279MIM
1281ATAM
1281BTAM
1291BOLG
1292BOLG
1293BOLG
1294BOLG
1301BOGO
13091WEX
1311SOGA
1327ABOA
1341WA
1351YEND
1361ESSI
1371MALL
1381SAWL
1391DCEM
1412KENY
1481Z-LV
1511BUIL
15543BLV
15553BLV
1581N-AB
1591KIN
1611BUIP
1621TUMU
1631HAN
Pays
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
P active
MW
417
50.1
92.5
92.5
92.5
92.5
92.5
11.3
11.3
45
45
47.3
47.3
57.1
57.1
100.4
3.6
3.6
7.2
4.4
14.5
14.5
14.5
6.5
6.5
6.5
28.3
28.3
28.3
4
129.1
64.5
64.5
64.5
53.8
53.8
24.9
21
21
13.9
13.9
50.6
7.4
7.4
0.6
39.7
39.7
1.8
11
7
17.9
24.8
26.3
26.3
26.9
29.2
29.2
5.3
5.3
5.3
5.3
78.2
21.7
19
0.3
11.1
12.8
30.7
146.9
2.8
26.4
65.8
11.9
1.8
147.6
147.6
65.3
7
24.3
7.4
0.9
Q reactive
Mvar
203.2
24.3
44.8
44.8
44.8
44.8
44.8
5.5
5.5
21.8
21.8
22.9
22.9
27.7
27.7
48.6
1.7
1.7
3.5
2.1
7
7
7
3.1
3.1
3.1
13.7
13.7
13.7
1.9
62.5
31.2
31.2
31.2
26.1
26.1
12.1
10.2
10.2
6.7
6.7
24.5
3.6
3.6
0.3
19.2
19.2
0.9
5.3
3.4
8.7
12
12.7
12.7
13
14.1
14.1
2.6
2.6
2.6
2.6
37.9
10.5
9.2
0.1
5.4
6.2
14.9
71.1
1.4
12.8
31.9
5.8
0.9
71.5
71.5
31.6
3.4
11.8
3.6
0.4
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Charge
Nom
KAYEPA15
SOTU1_15
SOTU2_15
KAMAKW_D
YIBEN__D
BIKONG_D
KENEMA_D
BUMBUN04
FRTOWN04
YEKEPA_D
BUCHAN_D
MONROV_D
MANO___D
2061FERK
2360KORH
2370BUND
2380ODIE
2111LABO
2390SEGU
2101MAN2400DANA
2071SUBR
2091BUYO
2410DALO
2340BOUA
2350MARA
2051BOUA
2041KOSS
2330ZUEN
2300SERE
2250YAMO
2260DIMB
2270ATAK
2280ABEN
2290AGNE
2031TAAB
2120AGBO
2320GAGN
2310DIVO
2150PLAT
2160BIAN
2140BONG
2240TREI
2180AYAM
2220BIAS
2021VRID
2210RIVI
2200BASS
2190ABRO
2081PEDR
200SIR90
20FAYE90
2130DABO
2011ABOB
2230YOPO
2231YOPO
2000HIRE
4BAGR132
4_PA_225
4KOSSO90
4OUAG190
4OUAG290
4ZAGTO90
4KOMP132
4PTDOI33
4OUAG333
4BOB1_33
4BOB2_33
4ZAGTO33
4KODEN33
4ZAGTO34
1017-1
1022
103111
103121
103131
103141
103151
103161
103171
103181
8.3.
Noeud
Nom
17501BON
1852ATEB
1998AYAN
1211JUAB
3ATAK161
3BOHI161
3020MOME
3LOME161
3010LOME
3040SAKA
3030COTO
3KARA161
3DJOU161
AVA___04
DAPAON04
MALANV04
MA_GLE04
PARAKO04
GAZAOU06
MARADI06
ZINDER06
NIAM22_D
DOSSO_06
NIAM2_06
DIFFA_02
KATSIN06
DELTA_06
IKEJAW02
ERUNKA02
AJA___02
ALAGBO02
AKANGB02
AIYEDE02
Pays
GH
GH
GH
GH
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
NR
NR
NR
NR
NR
NR
NR
NI
NI
NI
NI
NI
NI
NI
NI
P active
MW
1.7
3.5
19.3
1.7
22.3
44.8
74.8
116.3
346.3
6.3
418.6
33.2
0.1
19.2
7.1
2
48.4
53.5
5
10
34
50
7
138
8
300
179
2099
702
795
542
1559
914
Q reactive
Mvar
0.8
1.7
9.3
0.8
10.8
21.7
36.2
56.3
167.7
3.1
202.7
16.1
0
9.3
3.4
1
23.4
25.9
2.4
4.8
16.5
24.2
3.4
66.8
3.9
145.3
86.7
1016.6
340
385
262.5
755.1
442.7
Charge
Nom
GANMO_02
OSHOGB02
KANO__06
BIRNIN02
JEBBA_02
KATAMP02
GWAGWA02
LOKOJA02
SHIROR02
OMOTOS02
BENINN02
BENINC02
ALADJA02
AJAOKU02
PORTHA02
AFAM__02
ALAOJI02
CALABA02
MAKURD02
NEWHAV02
ONITSH02
OWERRI02
GOMBE_02
DAMATU02
MAIDUG02
JOS___02
YOLA__02
JALING02
EGBIN_02
PAPALA02
SOKOTO02
KADUNA02
ZARIA_02
Noeud
Nom
GANMO_02
OSHOGB02
KANO__06
BIRNIN02
JEBBA_02
KATAMP02
GWAGWA02
LOKOJA02
SHIROR02
OMOTOS02
BENINN02
BENINC02
ALADJA02
AJAOKU02
PORTHA02
AFAM__02
ALAOJI02
CALABA02
MAKURD06
NEWHAV02
ONITSH02
OWERRI02
GOMBE_02
DAMATU02
MAIDUG02
JOS___02
YOLA__02
JALING02
EGBIN_02
PAPALA02
SOKOTO02
KADUNA02
ZARIA_02
Pays
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
P active
MW
271
1106
675
317
43
691
389
158
448
279
242
491
175
85
404
263
1030
202
202
568
619
202
317
138
258
317
186
138
995
298
252
858
293
Q reactive
Mvar
131.3
535.7
326.9
153.5
20.8
334.7
188.4
76.5
217
135.1
117.2
237.8
84.8
41.2
195.7
127.4
498.9
97.8
97.8
275.1
299.8
97.8
153.5
66.8
125
153.5
90.1
66.8
481.9
144.3
122
415.5
141.9
Shunts
Banc
Nom
REAC 1
REAC 4
REAC 6
REAC 8
KAOLACSS
TANAF_SS
TAMBACSS
REAC 5
REAC 7
KAOLACOL
TANAF_OL
TAMBACOL
CAPTHION
CAPTOB90
CAPBELAI
COND 2
COND 3
CAPTAIBA
SOMA__SS
BRIKAMSS
SOMA__OL
BRIKAMOL
MANSOASS
BISSAUSS
BAMBACSS
SALTINSS
MANSOAOL
BISSAUOL
BAMBACOL
SALTINOL
CAPABISS
NZEREK03
SIGUIR03
KANKAN03
BEYLA_03
NZEREKGM
FOMI__03
KOROUS03
Noeud
Nom
TOBENE03
DAGANA03
MATAM_03
SAKAL_03
KAOLAC03
TANAF_03
TAMBAC03
DAGANA03
MATAM_03
KAOLAC03
TANAF_03
TAMBAC03
THIONA08
TOBENE08
BELAIR08
BELAIR08
BELAIR08
TAIBA_08
SOMA__03
BRIKAM03
SOMA__03
BRIKAM03
MANSOA03
BISSAU03
BAMBAD03
SALTHI03
MANSOA03
BISSAU03
BAMBAD03
SALTHI03
BISSAU1G
NZEREK03
SIGUIR03
KANKAN03
BEYLA_03
NZEREK03
FOMI__03
KOROUS03
Pays
Nom
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
GA
GA
GA
GA
GB
GB
GB
GB
GB
GB
GB
GB
GB
GU
GU
GU
GU
GU
GU
GU
Tension
kV
225
225
225
225
225
225
225
225
225
225
225
225
90
90
90
90
90
90
225
225
225
225
225
225
225
225
225
225
225
225
30
225
225
225
225
225
225
225
Puissance
Banc
Mvar/step #steps
-20
1
-20
1
-20
1
-20
1
-20
1
-20
1
-20
1
-25
1
-25
1
-25
3
-25
2
-25
2
10
2
10
4
10
3
8
1
8
1
5
3
-20
1
-20
1
-25
2
-25
1
-20
1
-20
1
-20
1
-20
1
-25
2
-25
1
-25
2
-25
2
10
2
-5
1
-15
2
-15
2
-15
2
-15
2
-15
2
-15
2
137/167
Banc
Nom
DABOLA03
LINSANGM
MALI__SS
LABE__SS
BOKE__SS
SAMBANSS
KALETASS
LINSANSS
FOMIBUND
MALI__OL
LABE__OL
BOKE__OL
KALETAOL
SAMBANOL
LINSANOL
REACAMAR
MAMOU_07
SONFON_D
MANEAH_D
MATOTO_D
TOMBO__D
SELING03
KODIALGM
REAC 11
REAC 9
MANANTA1
KODIALA1
KOUTIA03
REACSIKA
REAC 10
CAPLAFIA
CAPBALIN
CA2BALIN
FRTOWN04
YEKEPA03
RIVIER02
CAPAFERK
CAPABUND
Noeud
Nom
DABOLA03
LINSAN03
MALI__03
LABE__03
BOKE__03
SAMBAG03
KALETA03
LINSAN03
FOMI__03
MALI__03
LABE__03
BOKE__03
KALETA03
SAMBAG03
LINSAN03
AMARYA03
MAMOU_07
SONFON_D
MANEAH_D
MATOTO_D
TOMBO__D
SELING03
KODIAL03
KAYES_03
MANANT03
MANANT03
KODIAL03
KOUTIA03
SIKASS03
KAYES_03
LAFIA_05
BALING10
BALI1_11
FRTOWN04
YEKEPA03
RIVIER02
2060FERK
2371BUND
Pays
Nom
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
SL
LI
CI
CI
CI
Tension
Puissance
Banc
kV
Mvar/step #steps
225
-15
2
225
-15
2
225
-20
1
225
-20
1
225
-20
1
225
-20
1
225
-20
1
225
-20
1
225
-20
2
225
-25
2
225
-25
2
225
-25
2
225
-25
2
225
-25
2
225
-25
2
225
-25
1
110
3.84
1
60
3.84
3
60
3.84
1
60
3.84
25
20
3.84
10
225
-15
2
225
-15
2
225
-20
1
225
-25
1
225
-25
1
225
-25
1
225
-25
1
225
-25
1
225
-30
1
150
10
3
30
10
3
15
10
3
161
5
15
225
-5
1
330
20
1
225
10
8
225
10
2
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Charge
Nom
17501
1852-1
1998-1
1211JUAB
3ATAK161
3BOHI161
3020MOME
3LOME161
3010LOME
3040SAKA
3030COTO
3KARA161
3DJOU161
AVA___04
DAPAON04
MALANV04
MA_GLE04
PARAKO04
GAZAOU06
MARADI06
ZINDER06
NIAM22I
DOSSO
NIAM
DIFFA_02
KATS4D
DELTA_06
IKEJAW02
ERUNKA02
AJA___02
ALAGBO02
AKANGB02
AIYEDE02
Noeud
Nom
2100MAN2110LABO
2371BUND
2100MAN2070SOUB
2060FERK
2270ATAK
2280ABEN
2250YAMO
2260DIMB
2310DIVO
2130DABO
2320GAGN
2021VRID
2160BIAN
2150PLAT
2210RIVI
2240TREI
2011ABOB
2230YOPO
2220BIAS
2290AGNE
2410DALO
2360KORH
2051BOUA
2340BOUA
OUAGAE02
4ZAGT225
4KODE225
4ZAGT225
4_PA_225
4KOMP132
4PTDO132
4OUAG190
4OUAG290
4OUAG333
4PTDOI33
4PTDOI33
4KOSSO15
4OUAG115
4OUAG215
4OUAG215
4OUAG215
4OUAG115
4KOSSO15
4KOSSO15
4OUAG115
4OUAG115
1130KUMA
1350YEND
1280TAMA
1380SAWL
1260TECH
1290BOLG
1051ACH
1052ACH
1053ACH
1054ACH
1055ACH
1041T-LV
15543BLV
15553BLV
11392K2L
11391K2L
1071BCCO
1072C-CO
1131KUMA
1132KUMA
1133KUM1
1133KUM2
1092ATAR
1371MALL
1271SUNY
1202ASAW
1092BTAR
1081TAKO
1082TAKO
1061BWIN
1611BUIP
1301BOGO
1261TECH
1251KPAN
Pays
Nom
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Tension
Puissance
Banc
kV
Mvar/step #steps
225
-20
1
225
-20
1
225
-20
1
225
-25
1
225
-40
1
225
-40
1
90
12
1
90
12
1
90
12
1
90
12
1
90
12
1
90
12
1
90
10
2
90
7.2
3
90
7.2
5
90
7.2
2
90
7.2
1
90
7.2
3
90
7.2
8
90
7.2
15
90
7.1
14
90
6
1
90
5
3
90
5
3
90
5
7
90
-20
1
330
-30
4
225
10
2
225
-1.43
21
225
-15
2
225
-30
1
132
-4.5
1
132
-4.5
1
90
10
3
90
10
3
33
4.8
1
33
4.8
1
33
-3.5
1
15
4.8
1
15
4.8
1
15
4.8
4
15
3
1
15
1.5
2
15
1.2
5
15
0.9
1
15
0.69
2
15
0.6
1
15
0.3
1
161
25
1
161
2
1
161
-8.5
4
161
-8.5
2
161
-8.5
2
161
-12
2
34.5
21.6
2
34.5
21.6
2
34.5
21.6
1
34.5
21.6
2
34.5
21.6
1
34.5
21.6
7
34.5
21.6
2
34.5
21.6
1
34.5
21.6
1
34.5
18
1
34.5
10.8
1
34.5
10.8
1
34.5
10.8
2
34.5
10.8
2
34.5
10.8
2
34.5
10.8
2
34.5
10.8
1
34.5
10.8
4
34.5
10.8
1
34.5
10.8
2
34.5
10.8
1
34.5
10.8
2
34.5
10.8
1
34.5
10.8
1
34.5
10.8
1
34.5
10.8
1
34.5
5.4
2
34.5
5.4
2
138/167
Banc
Nom
1261TEC2
10312V12
10313V12
10314V12
10315VAL
1102BPRE
1102CPRE
1211ANOB
1211BNOB
1211CNOB
1272SUNY
1231HO-1
1581N-AB
1101APRE
1101BPRE
1122AOBU
1122BOBU
1122C0BU
INTMAL02
3030COTO
3LOME161
3050ONIG
PARAKO04
3KARA161
SALKAD02
INTNIA02
DOSSO
NIAM2C06
GAZAO106
GAZAO206
NIAM22
NIAM2N1
EGBEMA01
BENIN012
BENIN011
ERUNKA01
BENIN013
AJAOK011
AJAOK012
ABUJA011
MAKUR011
AJAOK013
MAKUR012
MAMBI011
MAMBI012
JALIN011
JALIN012
GOMBE_01
ABUJA012
KADUN011
KADUN012
KANO_011
OSHOG011
OSHOG012
MAMBI013
MAMBI014
JALIN013
AKANGB02
ALAGBO02
AJA___02
IKEJAWCR
MAKURD06
AYEDE08
KADUR2
KADUR3
AJAOR1
GOMBR3
GOMBR4
BENIR2
ALAOR1
INTBIR02
GOMBR1
GOMBR2
BENIR1
IKEWR1
JEBBR1
JEBBR2
KADUR1
KANOR1
KATAR1
KATS4DC1
Noeud
Nom
1261TECH
10312VAL
10313VAL
10314VAL
10315VAL
1102BPRE
1102CPRE
1211ANOB
1211BNOB
1211CNOB
1272SUNY
1231HO-1
1581N-AB
1101APRE
1101BPRE
1122AOBU
1122BOBU
1122COBU
MALANV02
3030COTO
3LOME161
3050ONIG
PARAKO04
3KARA161
SALKAD02
NIAMRD02
DOSSO_06
NIAM2C06
GAZAOU06
GAZAOU06
NIAM22_D
NIAM2C_D
EGBEMA01
BENINN01
BENINN01
ERUNKA01
BENINN01
AJAOKU01
AJAOKU01
ABUJA_01
MAKURD01
AJAOKU01
MAKURD01
MAMBIL01
MAMBIL01
JALING01
JALING01
GOMBE_01
ABUJA_01
KADUNA01
KADUNA01
KANO__01
OSHOGB01
OSHOGB01
MAMBIL01
MAMBIL01
JALING01
AKANGB02
ALAGBO02
AJA___02
IKEJAW02
MAKURD06
AIYEDE02
KADUNA02
KADUNA02
AJAOKU02
GOMBE_02
GOMBE_02
BENINC02
ALAOJI02
BIRNIN02
GOMBE_02
GOMBE_02
BENINC02
IKEJAW02
JEBBA_02
JEBBA_02
KADUNA02
KANO__02
KATAMP02
KATSIN06
Pays
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
TB
TB
TB
TB
TB
TB
NR
NR
NR
NR
NR
NR
NR
NR
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
Tension
Puissance
Banc
kV
Mvar/step #steps
34.5
5.4
1
13.8
20
2
13.8
20
2
13.8
20
2
13.8
18
1
13.2
20
1
13.2
20
1
11.5
5.4
1
11.5
5.4
1
11.5
5.4
1
11.5
5.4
1
11.5
5.4
1
11
5.4
2
6.63
1.2
2
6.63
1.2
2
6.6
1.8
1
6.6
1.8
1
6.6
1.8
2
330
-30
1
161
50
1
161
5
1
161
-3
3
161
-3
3
161
-18
1
330
-30
3
330
-58.7
3
132
16
1
132
2.5
1
132
-5
1
132
-5
1
20
10
1
20
4
7
760
-75
3
760
-75
3
760
-75
3
760
-75
2
760
-75
3
760
-75
3
760
-75
3
760
-75
3
760
-75
8
760
-75
5
760
-75
10
760
-75
10
760
-75
10
760
-75
10
760
-75
7
760
-75
7
760
-75
3
760
-75
3
760
-75
3
760
-75
3
760
-75
3
760
-75
2
760
-75
10
760
-75
10
760
-75
10
330
100
6
330
100
2
330
100
2
330
100
5
330
60
1
330
20
10
330
-30
1
330
-30
1
330
-30
1
330
-30
1
330
-30
1
330
-30
1
330
-30
1
330
-33
4
330
-50
1
330
-50
1
330
-75
1
330
-75
1
330
-75
1
330
-75
1
330
-75
1
330
-75
1
330
-75
1
132
20
1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Banc
Nom
CAPAMANCAPALABO
2371BUND
CSLGREAC
REACSOUB
REACFERK
2270ATAK
2280ABEN
CAPAYAMO
CAPADYMB
CAPADIVO
CAPADABO
2320GAGN
CAPAVRID
CAPABIAN
CAPAPLAT
CAPARIVI
CAPATREI
CAPAABOB
CAPAYOPO
CAPABIAS
CAPAAGNE
CAPADALO
CAPABOUA
CAPA51BO
REACBOU2
INTOUA02
CAPAZAGT
4KODE225
4ZAGT225
4_PA_225
4KOMP132
4PTDO132
CAPOUA19
CAPOUG29
4OUAG333
4PTDOI1
4PTDOI2
4KOS1_1
4OUAG11
4OUAG21
4OUAG22
4OUAG23
4OUAG12
4KOS2_1
4KOS3_1
4OUAG13
4OUAG14
1130KUM5
1350YEND
1280TAMA
1380SAWL
1260TECH
1290BOLG
1051ACH
1052ACH
1053ACH
1054ACH
1055ACH
1041T-LV
15543BLV
15553BLV
11392K2L
11391K2L
1071BCCO
1072C-CO
1131KUMA
1132KUMA
1133KUM1
1133KUM2
1092TARK
1371MALL
1271SUNY
1202ASAW
1092BTAR
1081TAKO
1082TAKO
1061BWIN
1611BUIP
1301BOGO
1261TECH
1251KPAN
Ligne
Noeud 1
Nom
MBOUR_03
THIONA08
TOBENE03
KAOLAC03
BELAIR08
BELAIR08
BELAIR08
HANN__08
HANN__08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
KOUNOU08
KOUNOU03
SOCOCI08
MECKHE08
DAGANA03
DAGANA03
SAKAL_03
KAOLAC03
KAOLAC03
HANN__08
SIBA__08
THIONA08
SOMETA08
KAOLAC03
TANAF_03
BELAIR08
UNIVER08
AEROPO08
PATTED08
PATTED08
TAIBA_08
TANAF_03
SENDOU03
SENDOU03
KOUNOU08
SENDOU03
SENDOU03
SENDOU03
KOUNOU08
TAMBAC03
SOMA__03
SOMA__03
BRIKAM03
BISSAU03
BAMBAD03
BAMBAD03
BISSAU03
SALTHI03
BAMBAD03
BAMBAD03
GRCHUT07
KINDIA07
LINSAN07
LINSAN07
YESSOU_D
MATOTO_D
SONFON_D
Pays
Nom
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
GA
GA
GA
GB
GB
GB
GB
GB
GB
GB
GU
GU
GU
GU
GU
GU
GU
Zone
Nom
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
GA
GA
GA
GB
GB
GB
GB
GB
GB
GB
GU
GU
GU
GU
GU
GU
GU
Noeud 2
Nom
SENDOU03
TOBENE08
TOUBA_03
TOUBA_03
HANN__08
HANN__08
HANN__08
KOUNOU08
MBAO__08
HANN__08
FICT1_08
KOUNOU08
MBAO__08
SOCOCI08
SOCOCI08
TOBENE03
FICT2_08
TOBENE08
MATAM_03
SAKAL_03
TOBENE03
TAMBAC03
SOMA__03
FICT1_08
FICT1_08
FICT2_08
FICT2_08
MBOUR_03
ZIGUIN03
UNIVER08
AEROPO08
PATTED08
CAPEBI08
HANN__08
TOBENE08
MANSOA03
KOUNOU03
KOUNOU03
HANN__08
KOUNOU03
KOUNOU03
KOUNOU03
HANN__08
KAYES_03
TANAF_03
BRIKAM03
SOMA__03
MANSOA03
MANSOA03
SALTHI03
MANSOA03
BOKE__03
SALTHI03
MANSOA03
KINDIA07
GRCHUT07
KINDIA07
KINDIA07
GRCHUT_D
SONFON_D
MATOTO_D
Pays
Nom
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
GA
GA
GA
GB
GB
GB
GB
GB
GB
GB
GU
GU
GU
GU
GU
GU
GU
139/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
8.4.
Pays
Nom
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
Zone
Nom
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
Noeud 2
Nom
MATOTO_D
MATOTO_D
MANEAH_D
SONFON_D
SONFON_D
SONFON_D
YESSOU_D
GARAFI07
GRCHUT07
MATOTO07
MATOTO07
DONKEA07
BANEAH_D
GARAFI07
GARAFI07
MAMOU_07
KALETA03
LINSAN03
LABE__03
MALI__03
SAMBAG03
TAMBAC03
FOMI__03
KANKAN03
BEYLA_03
NZEREK03
KOROUS03
DABOLA03
LINSAN03
LINSAN03
KALETA03
SALTHI03
2371BUND
AMARYA03
MATOTO03
DABOLA03
KOROUS03
FOMI__03
KOUKOU03
BOUREY03
MANANT03
MANANT03
KOUKOU03
LINSAN03
MANANT03
MATAM_03
TKITA_03
KODIAL03
SEGOU_05
SIRAKO05
LAFIA_05
KALABA05
SELING05
BALING05
BALING05
FANA__05
KOUTIA03
SEGOU_03
2060FERK
OULESS03
KODIAL03
4KODE225
KENIE_05
SELING03
SIGUIR03
MANANT03
Pays
Nom
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
140/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
SONFON_D
SONFON_D
SONFON_D
MANEAH_D
MANEAH_D
MANEAH_D
MANEAH_D
GRCHUT07
MATOTO07
GRCHUT07
GRCHUT07
GRCHUT07
DONKEA_D
LINSAN07
LINSAN07
LINSAN07
BOKE__03
KALETA03
LINSAN03
LABE__03
MALI__03
SAMBAG03
SIGUIR03
FOMI__03
KANKAN03
BEYLA_03
FOMI__03
KOROUS03
DABOLA03
KALETA03
BOKE__03
BOKE__03
FOMI__03
KALETA03
AMARYA03
LINSAN03
DABOLA03
KOROUS03
LINSAN03
KOUKOU03
BOUREY03
BOUREY03
BOUREY03
KOUKOU03
KAYES_03
KAYES_03
MANANT03
TKITA_03
FANA__05
KALABA05
KODIAL05
KODIAL05
SIRAKO05
SIRAKO05
SIRAKO05
SIRAKO05
SIKASS03
KOUTIA03
SIKASS03
SIKASS03
OULESS03
SIKASS03
SIRAKO05
KODIAL03
SELING03
BADOUM03
Pays
Nom
MA
MA
MA
MA
MA
SL
SL
SL
SL
SL
SL
SL
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
Zone
Nom
MA
MA
MA
MA
MA
SL
SL
SL
SL
SL
SL
SL
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
Noeud 2
Nom
LAFIA_05
KALABA05
TKITA_03
KODIAL03
SIRAKO05
KAMAKW03
LINSAN03
BUMBUN03
YIBEN_03
BIKONG03
FRTOWN04
FRTOWN04
KENEMA03
BUCHAN03
MONROV03
NZEREK03
MANO__03
MONROV03
TIBOTO03
2100MANBUCHAN03
BUCHAN03
YEKEPA03
1809ELUB
2010ABOB
2010ABOB
2500AZIT
2500AZIT
2160BIAN
2160BIAN
2240TREI
2240TREI
2021VRID
2220BIAS
2220BIAS
2210RIVI
2210RIVI
2061FERK
2360KORH
2370BUND
2111LABO
2390SEGU
2050BOUA
2400DANA
2350MARA
2090BUYO
2070SOUB
2410DALO
2041KOSS
2041KOSS
2300SERE
2051BOUA
2041KOSS
2041KOSS
2040KOSS
2250YAMO
2260DIMB
2270ATAK
2280ABEN
2280ABEN
2030TAAB
2310DIVO
2260DIMB
2030TAAB
2020VRID
20FAYE90
Pays
Nom
MA
MA
MA
MA
MA
SL
SL
SL
SL
SL
SL
SL
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
141/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
KODIAL05
KODIAL05
MANANT03
TKITA_03
SELING05
YIBEN_03
KAMAKW03
BIKONG03
BUMBUN03
KENEMA03
BUMBUN04
BUMBUN04
MANO__03
YEKEPA03
BUCHAN03
YEKEPA03
MONROV03
STPAUL03
BUCHAN03
YEKEPA03
YEKEPA03
MONROV03
2100MAN2010ABOB
2030TAAB
2030TAAB
2010ABOB
2010ABOB
2011ABOB
2011ABOB
2150PLAT
2150PLAT
2240TREI
2021VRID
2021VRID
2220BIAS
2220BIAS
2360KORH
2370BUND
2380ODIE
2380ODIE
2111LABO
2060FERK
2101MAN2340BOUA
2100MAN2090BUYO
2091BUYO
2410DALO
2320GAGN
2340BOUA
2340BOUA
2051BOUA
2330ZUEN
2050BOUA
2041KOSS
2250YAMO
2260DIMB
2270ATAK
2290AGNE
2040KOSS
2320GAGN
2031TAAB
2070SOUB
2500AZIT
2081PEDR
Pays
Nom
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
Zone
Nom
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
Noeud 2
Nom
2120AGBO
2140BONG
2170AYAM
2180AYAM
2190ABRO
2150PLAT
2160BIAN
2210RIVI
2190ABRO
2200BASS
2021VRID
2101MAN2081PEDR
2020VRID
2021VRID
2110LABO
2080S-PE
2031TAAB
2000HIRE
2229YOPO
2500AZIT
2130DABO
2231YOPO
2011ABOB
2021VRID
2230YOPO
4KODE225
2371BUND
2060FERK
2290AGNE
2209RIVI
2070SOUB
2010ABOB
2229YOPO
2030TAAB
2010ABOB
2230YOPO
2080S-PE
2220BIAS
2230YOPO
2011ABOB
4BOB2_33
4BOB2_33
4BOB2_33
4BOB2_33
4BOB2_33
4BOB1_33
4KODEN33
4ZANO132
4ZANO132
4PTDO132
4KODE225
4ZAGT225
4OUAG333
4OUAG133
4OUAG233
4PTDOI33
4OUAG233
4OUAG233
4KOSSO33
4ZAGTO33
4KOMSI33
4OUAG290
4_PC_090
4_PC_090
4KOSSO90
Pays
Nom
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
142/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
2031TAAB
2011ABOB
2140BONG
2170AYAM
2180AYAM
2011ABOB
2150PLAT
2160BIAN
2200BASS
2210RIVI
200SIR90
2111LABO
2071SUBR
2209RIVI
2240TREI
2100MAN2070SOUB
2000HIRE
2310DIVO
2010ABOB
2229YOPO
2011ABOB
2120AGBO
2231YOPO
2230YOPO
2011ABOB
2060FERK
2110LABO
2371BUND
2340BOUA
2500AZIT
2030TAAB
2229YOPO
2500AZIT
2040KOSS
2030TAAB
2021VRID
TIBOTO03
2021VRID
2011ABOB
2140BONG
4BOB1_33
4BOB1_33
4KODEN33
4KODEN33
4KODEN33
4KOUA_33
4KOUA_33
4BAGR132
4KOMP132
4ZANO132
4_PA_225
4_PA_225
4KOMSI33
4KOSSO33
4KOSSO33
4OUAG333
4OUAG133
4PTDOI33
4PTDOI33
4PTDOI33
4ZAGTO33
4OUAG190
4OUAG190
4OUAG190
4_PC_090
Pays
Nom
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Zone
Nom
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Noeud 2
Nom
4KOSSO90
4OUAG290
4ZAGT225
4KOSSO90
4KOSSO90
OUAGAE08
4PTDOI33
4KOMSI33
4OUAG333
4OUAG333
1050ACHI
1020VOLT
1020VOLT
1020VOLT
1140NKAW
1140NKAW
1130KUMA
1150TAFO
1150TAFO
1170KPON
1170KPON
1190KPON
1220ASIE
1392 AFT
1040TEMA
1040TEMA
1170KPON
1170KPON
1190KPON
1370MALL
1060WINN
1370MALL
1320ABOA
1320ABOA
1370MALL
1090TARK
1320ABOA
1320ABOA
1360ESSI
1100PRES
1095NEWT
1120OBUA
1300BOGO
1320ABOA
1100PRES
1210N-OB
1300BOGO
1210N-OB
1180KONO
1138T262
1260TECH
1150TAFO
1180KONO
1160AKWA
1210N-OB
1290BOLG
1350YEND
1309WEXF
1392 AFT
3010LOME
1270SUNY
1900TESI
1413KENY
1138T261
1413KENY
1413KENY
Pays
Nom
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
143/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
4_PC_090
4ZAGTO90
OUAGAE03
OUAGAE08
OUAGAE08
PATDOI08
4ZAGTO33
4ZAGTO33
4KOMSI33
4PTDOI33
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1139K2BS
1139K2BS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1020VOLT
1020VOLT
1020VOLT
1020VOLT
1020VOLT
1050ACHI
1370MALL
1050ACHI
1060WINN
1070C-CO
1070C-CO
1080TAKO
1080TAKO
1080TAKO
1080TAKO
1095NEWT
1090TARK
1100PRES
1100PRES
1090TARK
1090TARK
1110DUNK
1110DUNK
1120OBUA
1130KUMA
1130KUMA
1130KUMA
1140NKAW
1140NKAW
1150TAFO
1160AKWA
1280TAMA
1280TAMA
1300BOGO
1390DCEM
1392 AFT
1260TECH
1260TECH
1270SUNY
1120OBUA
1138T261
1138T262
Pays
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Zone
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
Noeud 2
Nom
1210N-OB
1310SOGA
1230HO
1240KPEV
1250KPAN
1480ZEB
BAWKU_04
1029VOLT
1901TES2
1900TESI
1500BUI
1590KIN
1901TES2
1610BUIP
1280TAMA
1260TECH
15533BSP
1050ACHI
15533BSP
1050ACHI
1050ACHI
1020VOLT
1278MIM
PRES330
30101LOM
1580N_AB
1580N_AB
1809ELUB
1750BONY
1800ELUB
1750BONY
1750BONY
1990AYAN
1110DUNK
1620TUMU
1630HAN
1630HAN
1380SAWL
1850ATEB
4ZAGT225
1252KPAN
1250KPAN
1200ASAW
1300BOGO
1200ASAW
1278MIM
1021SME2
1021SME2
1700ASOG
1021SME2
1021SME2
1021SME2
1021SME2
1021SME2
1021SME2
1032SMEL
1033SMEL
1034SMEL
1035SMEL
1036SMEL
1031SMEL
1470TT1P
1591KIN3
BOLGA330
1390DCEM
1309WEXF
Pays
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
144/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
1130KUMA
1221ASIE
1221ASIE
1230HO
1240KPEV
1290BOLG
1480ZEB
ABOA_330
1500BUI
1500BUI
1413KENY
1500BUI
1380SAWL
1590KIN
1610BUIP
1590KIN
1020VOLT
15533BSP
1020VOLT
15533BSP
15533BSP
15533BSP
1270SUNY
KSI330
1029VOLT
1140NKAW
1140NKAW
1109PRES
1600OPB1750BONY
1360ESSI
1600OPB1200ASAW
1990AYAN
1290BOLG
1620TUMU
1340WA
1340WA
1590KIN
12951BOL
1220ASIE
1255KADJ
1413KENY
1100PRES
1210JUAB
1210JUAB
1020VOLT
1700ASOG
1021SME2
1020VOLT
1020VOLT
1020VOLT
1020VOLT
1020VOLT
1020VOLT
1021SME2
1021SME2
1021SME2
1021SME2
1021SME2
1021SME2
1021SME2
KSI330
1591KIN3
1392 AFT
1300BOGO
Pays
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
Zone
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
BN
BN
BN
TO
TO
TO
TO
TO
TO
TO
TO
BN
BN
BN
TO
TO
TO
BN
BN
TO
BN
TO
TO
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
BN
TO
Noeud 2
Nom
3010LOME
PRES330
1021SME2
4KODE225
RIVIER02
1758BON3
1870CAPE
1870CAPE
1870CAPE
ABOA_330
1850BERE
1270SUNY
ABOA_330
1700ASO2
1700ASO2
30101LOM
1020VOLT
15533BSP
1050ACHI
1115DUNK
KSI330
1480ZEB
1850ATEB
1350YEND
ABOA_330
1029VOLT
1370MALL
1050ACHI
IKEJAW02
OMOTOS02
OMOTOS02
3020MOME
3020MOME
MA_GLE04
3LOME161
3BOHI161
3020MOME
3LOME161
AVA___04
3030COTO
3030COTO
3050ONIG
3ATAK161
3DJOU161
3KARA161
AVA___04
3050ONIG
BAWKU_04
PARAKO04
MANGO_04
DAPAON04
3030COTO
3030COTO
3030COTO
3030COTO
3050ONIG
MA_GLE04
MA_GLE04
TANZOU04
TANZOU04
BEMBER04
KANDI_04
KANDI_04
MALANV04
NATITI04
SAKETE02
Pays
Nom
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
145/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
1220ASIE
1758BON3
1470TT1P
12951BOL
PRES330
PRES330
1060WINN
1320ABOA
1070C-CO
CAPE330
1270SUNY
1850BERE
1758BON3
1029VOLT
1029VOLT
1700ASO2
1010AKOS
1020VOLT
15533BSP
PRES330
1115DUNK
1290BOLG
1590KIN
1280TAMA
1560A4BS
1560A4BS
1561A4BS
1561A4BS
SAKETE02
SAKETE02
SAKETE02
3010LOME
3010LOME
3020MOME
3010LOME
3060NANG
3060NANG
3010LOME
3020MOME
3040SAKA
3040SAKA
3040SAKA
3060NANG
3KARA161
3ATAK161
MA_GLE04
3BOHI161
DAPAON04
3DJOU161
3KARA161
MANGO_04
MA_GLE04
MA_GLE04
MA_GLE04
MA_GLE04
PARAKO04
3040SAKA
3040SAKA
3040SAKA
3040SAKA
PARAKO04
BEMBER04
GUENE_04
GUENE_04
3DJOU161
30101LOM
Pays
Nom
TB
TB
TB
TB
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
Zone
Nom
TO
TO
BN
TO
CE
CE
CE
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
LA
LA
LA
LA
SH
SH
SH
SH
BE
BE
BE
BE
BE
BE
EN
EN
EN
EN
LA
LA
LA
SH
SH
SH
SH
SH
SH
SH
KD
KD
KD
BA
BA
BA
BE
BE
BE
BE
BE
BE
BE
EN
EN
EN
LA
Noeud 2
Nom
AVA___04
ADJARA04
3040SAKA
AVA___04
KATSIN06
GAZAOU06
ZINDER06
NIAM2C06
NIAM2_06
FRONT_06
BIRNIN06
NIAMRD02
MALANV02
OUAGAE02
ZABORI02
SALKAD02
MARADI06
NIAMRD06
NIAMRD06
NIAM2_06
NIAM2_06
EGBIN_02
EGBIN_02
IKEJAW02
IKEJAW02
JEBBA_02
JEBBA_02
SHIROR02
SHIROR02
DELTA_02
SAPELE02
SAPELE02
SAPELE02
EGBIN_02
IKEJAW02
ONITSH02
ONITSH02
ALAOJI02
ALAOJI02
IKEJAW02
IKEJAW02
OSHOGB02
KAINJI02
KAINJI02
KAINJI02
ZUNGER02
ZUNGER02
OSHOGB02
OSHOGB02
KANO__02
SHIROR02
SHIROR02
JOS___02
YOLA__02
KADUNA02
BENINN02
BENINN02
DELTA_02
SAPELE02
ONITSH02
ONITSH02
OSHOGB02
ONITSH02
IKOTEK02
ONITSH02
OSHOGB02
Pays
Nom
TB
TB
TB
TB
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
146/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
ADJARA04
3060NANG
3050ONIG
ADJARA04
GAZAOU06
MARADI06
GAZAOU06
DOSSO_06
NIAM2C06
DOSSO_06
FRONT_06
DOSSO02
ZABORI02
NIAMRD02
DOSSO02
DOSSO02
SALKAD06
NIAM2_06
NIAM2_06
KANDAD06
KANDAD06
AJA___02
AJA___02
EGBIN_02
EGBIN_02
JEBBAP02
JEBBAP02
KATAMP02
KATAMP02
BENINC02
BENINC02
BENINC02
BENINC02
BENINC02
OMOTOS02
KWALE_02
KWALE_02
AFAM__02
AFAM__02
AKANGB02
AKANGB02
IKEJAW02
BIRNIN02
JEBBA_02
JEBBA_02
JEBBA_02
JEBBA_02
JEBBA_02
JEBBA_02
KADUNA02
KADUNA02
KADUNA02
GOMBE_02
GOMBE_02
JOS___02
AJAOKU02
AJAOKU02
ALADJA02
ALADJA02
BENINC02
BENINC02
BENINC02
NEWHAV02
ALAOJI02
ALAOJI02
AIYEDE02
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
Zone
Nom
KD
KD
LA
BA
BA
LA
LA
BE
BE
BE
BE
BA
BA
SH
KD
LA
LA
SH
LA
LA
LA
LA
LA
SH
SH
SH
SH
SH
SH
SH
SH
BE
BE
BE
BE
BE
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
BA
BA
BA
BE
BE
BE
BE
EN
Noeud 2
Nom
KATSIN06
KANO__06
BENINC02
YOLA__02
MAKURD01
OSHOGB01
BENINN01
EGBEMA01
AJAOKU01
MAKURD01
ABUJA_01
MAMBIL01
GOMBE_01
KADUNA01
KANO__01
ERUNKA02
EGBIN_02
GANMO_02
OSHOGB02
AIYEDE02
IKEJAW02
AJA___02
AJA___02
LOKOJA02
AJAOKU02
LOKOJA02
AJAOKU02
KATAMP02
GWAGWA02
SHIROR02
GWAGWA02
BENINC02
AJAOKU02
BENINC02
BENINC02
BENINC02
OWERRI02
OWERRI02
ALAOJI02
ALAOJI02
EGBEMA02
EGBEMA02
OMOKU_02
OMOKU_02
NEWHAS02
NEWHAS02
ALIADE02
NEWHAS02
ALIADE02
ALIADE02
IKOTEK02
IKOTEK02
AFAM__02
AFAM__02
IKOTAB02
IKOTAB02
AFAM__02
AFAM__02
DAMATU02
MAIDUG02
JALING02
GEREGU02
GEREGU02
EYAEN_02
EYAEN_02
AHOADA02
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
147/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
KANKIA06
KANKIA06
IKEJAW02
GOMBE_02
MAMBIL01
ERUNKA01
OSHOGB01
BENINN01
BENINN01
AJAOKU01
AJAOKU01
JALING01
JALING01
ABUJA_01
KADUNA01
IKEJAW02
ERUNKA02
JEBBA_02
GANMO_02
PAPALA02
PAPALA02
ALAGBO02
ALAGBO02
GWAGWA02
LOKOJA02
GWAGWA02
LOKOJA02
GWAGWA02
KATAMP02
GWAGWA02
SHIROR02
OMOTOS02
BENINN02
BENINN02
BENINN02
BENINN02
ONITSH02
ONITSH02
OWERRI02
OWERRI02
OWERRI02
OWERRI02
EGBEMA02
EGBEMA02
NEWHAV02
NEWHAV02
NEWHAS02
ALIADE02
MAKURD06
MAKURD06
NEWHAS02
NEWHAS02
IKOTEK02
IKOTEK02
IKOTEK02
IKOTEK02
PORTHA02
PORTHA02
GOMBE_02
DAMATU02
YOLA__02
AJAOKU02
AJAOKU02
BENINN02
BENINN02
OWERRI02
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
Zone
Nom
EN
EN
EN
EN
EN
EN
BA
SH
SH
KD
KD
KD
KD
SH
BA
BA
BA
BA
SH
EN
EN
EN
BE
LA
BE
BE
BE
BE
LA
LA
BE
BE
EN
EN
EN
EN
BE
BE
LA
SH
SH
KD
KD
KD
KD
KD
BA
BA
SH
SH
BA
BA
LA
Noeud 2
Nom
AHOADA02
YENAGO02
YENAGO02
GBARAN02
GBARAN02
JOS___02
MAKURD06
SOKOTO02
SOKOTO02
JOS___02
KATSIN02
KATSIN02
KADUNA02
KAINJI02
GOMBE_02
DAMATU02
MAIDUG02
YOLA__02
ZABORI02
IKOTEK02
CALABA02
CALABA02
OSHOGB02
BENINN02
ONITSH02
ONITSH02
EPE___02
EPE___02
AJA___02
AJA___02
ERUNKA02
ERUNKA02
NNEWI_02
NNEWI_02
OWERRI02
OWERRI02
PORTHA02
PORTHA02
PAPALA02
GUSAU_02
GUSAU_02
ZARIA_02
ZARIA_02
KADUNA02
KADUNA02
KANO__02
GOMBE_02
MAIDUG02
SHIROR02
SHIROR02
MAKURD01
JALING01
AKANGB02
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
148/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
OWERRI02
AHOADA02
AHOADA02
YENAGO02
YENAGO02
MAKURD06
JOS___02
BIRNIN02
BIRNIN02
KADUNA02
KANO__02
KANO__02
KANO__02
BIRNIN02
JOS___02
GOMBE_02
DAMATU02
JALING02
BIRNIN02
ALAOJI02
IKOTEK02
IKOTEK02
BENINN02
OSHOGB02
BENINC02
BENINC02
OMOTOS02
OMOTOS02
EPE___02
EPE___02
OMOTOS02
OMOTOS02
ONITSH02
ONITSH02
NNEWI_02
NNEWI_02
DELTA_02
DELTA_02
IKEJAW02
SOKOTO02
SOKOTO02
GUSAU_02
GUSAU_02
ZARIA_02
ZARIA_02
KADUNA02
JOS___02
DAMATU02
ZUNGER02
ZUNGER02
MAMBIL01
MAMBIL01
IKEJAW02
Couplages
Noeud 1
NIAM22_D
DIFFA_02
KAHO2_03
KAHO1_03
CAPEBI08
MAURIT03
1132KUMA
1132KUMA
1133KUM1
1051ACH
8.6.
Noeud 2
NIAM21_D
MAIDUG02
KAOLAC03
KAOLAC03
GTIIPP08
DAGANA03
1131KUMA
1133KUM1
1133KUM2
1052ACH
Noeud 1
1052ACH
1053ACH
1054ACH
1152TAFO
1041T-LV
1061BWIN
1281ATAM
1081TAKO
1122AOBU
1122BOBU
Noeud 2
1053ACH
1054ACH
1055ACH
1151TAF0
1042T-LV
1061AWIN
1281BTAM
1082TAKO
1122BOBU
1122COBU
Noeud 1
1121AOBU
1121BOBU
1162AKWA
1273SUNY
1371MALL
15543BLV
11391K2L
1998AYAN
1201ASAW
1070C-CO
Noeud 2
1121BOBU
1121COBU
1161AKWA
1272SUNY
1372MALL
15553BLV
11392K2L
1995AYAN
1202ASAW
1070CCO3
Noeud 1
1072C-CO
1092ATAR
1181AKON
1211ANOB
1211BNOB
1281ATAM
1412KENY
Noeud 2
1071BCCO
1092BTAR
1181BKON
1211BNOB
1211CNOB
1282ATAM
1414KENY
Transformateurs
Noeud 1
Nom
IKOTAB06
IKOTAB06
IKOTAB06
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
AFAM__02
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_06
DELTA_02
DELTA_02
DELTA_02
DELTA_02
DELTA_02
DELTA_02
EGBIN_02
EGBIN_02
EGBIN_02
EGBIN_02
EGBIN_02
EGBIN_02
EGBIN_06
EGBIN_06
EGBIN_06
EGBIN_06
EGBIN_06
EGBIN_06
EGBIN_06
EGBIN_06
EGBIN_06
JEBBAP02
JEBBAP02
JEBBAP02
JEBBAP02
JEBBAP02
JEBBAP02
Noeud 2
Nom
IBOMGT01
IBOMGT02
IBOMGT03
AFAMGT13
AFAMGT14
AFAMGT15
AFAMGT16
AFAMGT17
AFAMGT18
AFAMGT19
AFAMGT20
AFAM6GT1
AFAM6GT2
AFAM6GT3
AFAM6GT4
AFAM6GT5
DELTAG03
DELTAG04
DELTAG05
DELTAG06
DELTAG07
DELTAG08
DELTAG09
DELTAG10
DELTAG11
DELTAG12
DELTAG13
DELTAG14
DELTAG15
DELTAG16
DELTAG17
DELTAG18
DELTAG19
DELTAG20
EGBINST1
EGBINST2
EGBINST3
EGBINST4
EGBINST5
EGBINST6
EGBINGT1
EGBINGT2
EGBINGT3
EGBINGT4
EGBINGT5
EGBINGT6
EGBINGT7
EGBINGT8
EGBINGT9
JEBBGH1
JEBBGH2
JEBBGH3
JEBBGH4
JEBBGH5
JEBBGH6
V1
kV
132
132
132
330
330
330
330
330
330
330
330
330
330
330
330
330
132
132
132
132
132
132
132
132
132
132
132
132
330
330
330
330
330
330
330
330
330
330
330
330
132
132
132
132
132
132
132
132
132
330
330
330
330
330
330
V2
kV
11.5
11.5
15
10.5
10.5
11.5
11.5
11.5
11.5
15.75
15.75
15
15
15
15
15
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
16
16
16
16
16
16
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
16
16
16
16
16
16
SN
MVA
45
45
142
110
110
110
110
110
110
165
165
163
163
163
163
163
81
81
81
81
81
81
81
81
81
81
81
81
120
120
120
120
120
120
270
270
270
270
270
270
38.6
38.6
38.6
39.5
39.5
39.5
40.5
40.5
40.5
119
119
119
119
119
119
Zcc
%pu
11.2
11.2
11.2
8.0
8.0
8.0
8.0
8.0
8.0
13.0
13.0
13.0
13.0
13.0
13.0
13.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
7.8
7.8
7.8
7.8
7.8
7.8
10.2
10.2
10.2
10.2
10.2
10.2
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.4
10.4
10.4
10.4
10.4
10.4
149/167
Noeud 1
Nom
KAINJI02
KAINJI02
KAINJI02
KAINJI02
KAINJI02
KAINJI02
KAINJI02
KAINJI02
SHIROR02
SHIROR02
SHIROR02
SHIROR02
KWALE_02
KWALE_02
KWALE_02
BIRNIN02
BIRNIN06
DELTA_02
DELTA_06
EGBIN_02
EGBIN_06
EGBIN_02
EGBIN_06
SAPELE02
SAPELE02
SAPELE02
SAPELE02
SAPELE02
SAPELE02
KANO__02
KANO__02
KANO__06
KANO__06
KANO__01
KADUNA01
AJAOKU01
BENINN01
OSHOGB01
GOMBE_01
ERUNKA01
EGBEMA01
MAKURD01
JALING01
CALABA02
CALABA02
CALABA02
CALABA02
CALABA02
EGBEMA02
EGBEMA02
EGBEMA02
OMOTOS02
OMOTOS02
OMOTOS02
OMOTOS02
Noeud 2
Nom
KAING05
KAING06
KAING07
KAING08
KAING09
KAING10
KAING11
KAING12
SHIRGH1
SHIRGH2
SHIRGH3
SHIRGH4
KWALCC1
KWALCC2
KWALCC3
BIRNT1
BIRNT1
DELTT1
DELTT1
EGBINT1
EGBINT1
EGBINT2
EGBINT2
SAPELST6
SAPELST5
SAPELST4
SAPELST3
SAPELST2
SAPELST1
KANOT1A
KANOT1A
KANOT1A
KANOT1A
KANO__02
KADUNA02
AJAOKU02
BENINN02
OSHOGB02
GOMBE_02
ERUNKA02
EGBEMA02
MAKURD06
JALING02
CALABGT1
CALABGT2
CALABGT3
CALABGT4
CALABGT5
EGBEMGT1
EGBEMGT2
EGBEMGT3
OMOTGT12
OMOTGT34
OMOTGT56
OMOTGT78
V1
kV
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
132
330
132
330
132
330
132
330
330
330
330
330
330
330
330
132
132
760
760
760
760
760
760
760
760
760
760
330
330
330
330
330
330
330
330
330
330
330
330
V2
kV
16
16
16
16
16
16
16
16
15.65
15.65
15.65
15.65
15.75
15.75
15.75
1
1
1
1
1
1
1
1
15.75
15.75
15.75
15.75
15.75
15.75
1
1
1
1
330
330
330
330
330
330
330
330
330
330
15
15
15
15
15
15
15
15
10.5
10.5
10.5
10.5
SN
MVA
145
145
92
92
92
92
115
115
200
200
200
200
200
200
200
109
90
150
150
150
150
150
150
400
400
400
400
400
400
450
450
450
450
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
142
142
142
142
142
142
142
142
105
105
105
105
Zcc
%pu
12.4
12.4
12
12
12
10.8
11.7
11.7
12.85
12.85
12.85
12.85
12.85
12.85
12.85
12.15
-0.1118
12
-1.99745
12
-1.99745
12
-1.99745
14.4998
14.4998
14.4998
14.4998
14.4998
14.4998
12
12
-1.99745
-1.99745
10
10
10
10
10
10
10
10
10
10
13
13
13
13
13
13
13
13
14.4
14.4
14.4
14.4
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
8.5.
Noeud 2
Nom
OMOT2GT1
OMOT2GT2
OMOT2GT3
OMOT2GT4
PAPA2GT1
PAPAGT12
PAPAGT34
PAPAGT56
PAPAGT78
PAPA2GT2
PAPA2GT3
PAPA2GT4
ALAOJGT1
ALAOJGT2
ALAOJGT3
ALAOJGT4
ALAOCCG1
ALAOCCG2
GEREGGT1
GEREGGT2
GEREGGT3
GEREGGT4
GEREGGT5
GEREGGT6
EYAENGT3
EYAENGT4
EYAENGT1
EYAENGT2
GBARAGT1
GBARAGT2
KATAMP02
SAPELGT4
SAPELGT2
SAPELGT3
SAPELGT1
IKOTAGT1
IKOTAGT2
IKOTAGT3
IKOTABT1
IKOTABT1
IKOTABT1
IKOTABT1
ALSCOGT1
ALSCOGT2
ALSCOGT3
ALSCOGT4
ALSCOGT5
ALSCOGT6
OMOKU_T1
OMOKU_T1
OMOKUGT2
OMOKUGT1
OMOKURG1
KATSINT1
KATSIN06
OMOKURG2
GBARANT1
GBARANT1
IKOTABT2
IKOTABT2
NIAM22_D
NIAM22_D
NIAM21_D
NIAM2C_D
NIAMRD06
NIAMRD06
SALKAD06
SALKAD_G
BUCHANG1
BUCHANG2
BUMBUN04
KAMAKW_D
YIBEN__D
BIKONG_D
KENEMA_D
YEKEPA_D
NZEREK_D
MANO___D
MONROV09
BUCHAN_D
MATOTO07
V1
kV
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
132
132
760
330
330
330
330
330
330
330
330
330
132
132
132
132
132
132
132
132
330
132
330
330
132
330
1
132
330
132
330
132
132
132
132
132
330
330
330
330
33
33
225
225
225
225
225
225
225
225
225
225
60
V2
kV
15
15
15
15
15
10.5
10.5
10.5
10.5
15
15
15
15
15
15
15
17
17
15.75
15.75
15.75
15.75
15.75
15.75
15
15
15
15
15
15
330
15
15
15
15
15
15
15
1
1
1
1
15
15
15
15
15
15
1
1
15
15
11.5
1
132
11.5
1
1
1
1
20
20
20
20
132
132
132
10.5
10.5
10.5
161
33
33
33
33
33
33
33
66
33
110
SN
MVA
157
157
157
157
157
105
105
105
105
157
157
157
157
157
157
157
356
356
168
168
168
168
168
168
142
142
142
142
142
142
1000
142
142
142
142
142
142
142
150
150
150
150
142
142
142
142
142
142
150
150
142
142
62.5
450
450
62.5
150
150
150
150
20
20
20
30
150
150
150
75
21.88
21.88
70
40
40
40
40
40
40
40
70
40
25
Zcc
%pu
13
13
13
13
13
14.4
14.4
14.4
14.4
13
13
13
13
13
13
13
13
13
16.07
16.07
16.07
16.07
16.07
16.07
13
13
13
13
13
13
10
13
13
13
13
13
13
13
12
12
-1.99745
-1.99745
13
13
13
13
13
13
12
-1.99745
13
13
11.2
12
-1.99745
11.2
12
-1.99745
12
-1.99745
9.8533
9.8533
9.8533
14
12.15
12.15
12.15
12
10
10
10
10
10
10
10
10
10
10
10
10
5.6
150/167
Noeud 1
Nom
MATOTO_D
MATOTO_D
MATOTO_D
TOMBO__D
TOMBO__D
TOMBO__D
TB3G2
TOMBO__D
TB3G4
TB5G3
MANEAH_D
MANEAH_D
MANEAH_D
TB5G1
TOMBO__D
GRCHUT_D
DONKEA07
LINSAN03
LINSAN03
GARAFI07
GARAFI07
DONKEAG2
BANEAHG1
DONKEAG1
BANEAHG2
GRCHUTG3
GRCHUT_D
GRCHUTG2
GARAFI07
GRCHUTG1
BUMBUN04
BUMBUN04
BUMBUN04
MONROV09
MONROV09
MONROV09
MONROV09
MONROV09
MONROV09
TOBENE08
TOBENE08
KAHO2_03
KAHO1_03
BELAIR11
BELAIR11
BELAIR1G
CAPEBI9G
CAPEBI8G
CAPEBI7G
CAPEBI6G
CAPEBI5G
CAPEBI4G
CAPEBI1G
CAPEBI3G
CAPEBI2G
KOUNOU11
KOUNOU11
GTI___1G
MATAM_08
MATAM_08
SAKAL_10
SAKAL_10
SAKAL_10
MANANT5G
MANANT4G
MANANT3G
MANANT2G
MANANT1G
BRIKAM1G
BALI1_11
BALI1_11
BALING1G
BALING2G
BALING3G
BALING4G
KODIAL03
SELING1G
SOPAM_1G
SOTU1_1G
BALI2_11
BALI1_11
Noeud 2
Nom
MATOTO07
MATOTO07
MATOTO07
MATOTO_D
MATOTO_D
TB3G1
TOMBO__D
TB3G3
TOMBO__D
TOMBO__D
MANEAHG1
MANEAHG2
MANEAHG3
TOMBO__D
TB5G2
GRCHUT07
DONKEA_D
LINSAN07
LINSAN07
GARAFIG1
GARAFIG2
DONKEA07
BANEAH_D
DONKEA07
BANEAH_D
GRCHUT_D
GRCHUTG4
GRCHUT_D
GARAFIG3
GRCHUT_D
BUMBU1G1
BUMBU1G2
BUMBUN2G
MONROV_D
MONROV_D
MTCOFFG1
MTCOFFG2
MTCOFFG3
MTCOFFG4
TOBENE03
TOBENE03
KAHONE2G
KAHONE1G
BELAIR08
BELAIR08
BELAIR08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
CAPEBI08
KOUNOU08
KOUNOU08
GTIIPP08
MATAM_03
MATAM_03
SAKAL_03
SAKAL_03
SAKAL_03
MANANT03
MANANT03
MANANT03
MANANT03
MANANT03
BRIKAM03
BALING05
BALING05
BALI2_11
BALI2_11
BALI2_11
BALI2_11
KODIAL05
SELING05
SIRAKO05
BALING10
BALING10
BALING10
V1
kV
60
60
60
20
20
20
6.3
20
6.3
11
60
60
60
11
20
60
110
225
225
110
110
6.3
3.15
6.3
3.15
5.5
60
3.3
110
3.3
161
161
161
66
66
66
66
66
66
90
90
225
225
15
15
11
6.6
6.6
6.6
6.6
6.6
6.6
11
6.6
6.6
15
15
11
90
90
30
30
30
11
11
11
11
11
30
15
15
6.6
6.6
6.6
6.6
225
8.66
8.66
2
15
15
V2
kV
110
110
110
60
60
6.3
20
6.3
20
20
11
11
11
20
11
110
15
110
110
5.65
5.65
110
15
110
15
60
5.5
60
5.65
60
13.8
13.8
13.8
33
33
10.5
10.5
10.5
10.5
225
225
15
15
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
225
225
225
225
225
225
225
225
225
225
225
150
150
15
15
15
15
150
150
150
30
30
30
SN
MVA
25
25
25
50
50
16
16
16
16
13.75
52.5
52.5
52.5
13.75
13.75
12.5
15
75
75
31.5
31.5
8.5
2.78
8.5
2.78
11
11
6.3
31.5
6.3
31.25
31.25
50
20
20
20.62
20.62
20.62
20.62
75
75
50
50
50
50
37
33
36
35
26.48
26.48
30
40
27
30
40
40
76
20
20
20
20
20
47
47
47
47
47
50
80
54
3
3
3
3
75
54
78
14.5
24
15
Zcc
%pu
5.6
5.6
5.6
11.9
11.9
10.5
10.5
10.5
10.5
10
10
10
10
10
10
10.4
10
10
10
9.98
9.98
10
6
10
6
8
8
6.5
9.98
6.5
10
10
10
10
10
10
10
10
10
7.49
7.49
13.25
13.25
14.93
14.93
13.6
4.09
4.61
4.55
2.86
2.86
3.33
4.8
2.89
3.3
4.78
4.78
9.88
2.04
2.04
2.05
2.05
2.05
5.88
5.88
5.88
5.88
5.88
10
11.2
11.2
6
6
6
6
12
11.2
11.2
7.72
10
7.1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
OMOTOS02
OMOTOS02
OMOTOS02
OMOTOS02
PAPALA02
PAPALA02
PAPALA02
PAPALA02
PAPALA02
PAPALA02
PAPALA02
PAPALA02
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
GEREGU02
GEREGU02
GEREGU02
GEREGU02
GEREGU02
GEREGU02
EYAEN_02
EYAEN_02
EYAEN_02
EYAEN_02
GBARAN06
GBARAN06
ABUJA_01
SAPELE02
SAPELE02
SAPELE02
SAPELE02
IKOTAB02
IKOTAB02
IKOTAB02
IKOTAB02
IKOTAB02
IKOTAB06
IKOTAB06
IKOTAB06
IKOTAB06
IKOTAB06
IKOTAB06
IKOTAB06
IKOTAB06
OMOKU_02
OMOKU_06
OMOKU_02
OMOKU_02
OMOKU_06
KATSIN02
KATSINT1
OMOKU_06
GBARAN02
GBARAN06
IKOTAB02
IKOTAB06
NIAM2_06
NIAM2_06
NIAM2_06
NIAM2C06
NIAMRD02
NIAMRD02
SALKAD02
SALKAD02
BUCHAN_D
BUCHAN_D
BUMBUN03
KAMAKW03
YIBEN_03
BIKONG03
KENEMA03
YEKEPA03
NZEREK03
MANO__03
MONROV03
BUCHAN03
MATOTO_D
Noeud 2
Nom
BALING10
BALING10
BALING10
LAFIA_05
LAFIA_05
LAFIA_05
LAFIA_05
LAFIA_05
SEGOU_05
SELING05
KODIAL05
SEGOU_05
SEGOU_05
KENIE_05
KENIE_05
KENIE_05
KAYES_03
KAYES_03
KOUTIA03
SEGOU_05
SIRAKO05
KAYES_03
CAPEBI08
SENDOU03
KOUNOU03
TAMBAC11
DAGANA11
CAPEB11G
KOUTIA03
KAYES_03
SIKASS03
1011AKOS
1012AKOS
1013AKOS
1014AKOS
1015AKOS
1016AKOS
10311VAL
10317VAL
10312VAL
10318VAL
10313VAL
10314VAL
10315VAL
10316VAL
1191KPON
1192KPON
1193KPON
1194KPON
1321ABOA
1322ABOA
1323ABOA
1324ABOA
1325ABOA
1412KENY
1412KENY
1601OPB1602OPB1800ELUB
1800ELUB
1471TT1P
1472TT1P
13091WEX
10951NTA
10951NTA
1481Z-LV
1041T-LV
1041T-LV
1041T-LV
1041T-LV
1042T-LV
1051ACH
1052ACH
1053ACH
1054ACH
1055ACH
1081TAKO
1082TAKO
1092BTAR
1102APRE
1131KUMA
V1
kV
15
15
11
5.5
5.5
5.5
5.5
0.4
2
2
225
225
225
8.66
8.66
8.66
11
11
8.66
2
8.66
11
6.6
6.6
90
225
225
90
8.66
11
8.66
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
225
225
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
V2
kV
30
30
30
150
150
150
150
150
150
150
150
150
150
150
150
150
225
225
225
150
150
225
90
225
225
15
15
15
225
225
225
14.4
14.4
14.4
14.4
14.4
14.4
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
11
11
13.8
13.8
161
161
13.8
13.8
34.5
11.5
11.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
13.2
34.5
SN
MVA
15
15
30
5.3
7
7
8
4.8
3.3
3.3
75
25
25
18
18
18
25
25
6
3.8
38
75
62.5
157
75
37.5
40
157
36
25
12
200
200
200
200
200
200
85
18
102
18
102
102
85
85
51
51
51
51
155
155
155
155
155
53
53
145
145
200
200
141
141
33
33
33
33
66
66
66
66
66
66
66
66
66
66
66
66
33
26.7
66
Zcc
%pu
7.1
7.1
12
11.2
11.2
11.2
11.2
11.2
10
10
12
12
12
11.2
11.2
11.2
12
12
12
10
11.2
12
10
10
7.49
10
10
10
12
12
12
13.35
13.35
13.35
13.35
13.35
13.35
12.9
10.1
12.9
12.9
12.9
12.9
12.9
12.9
10.6
10.6
10.6
10.6
12.6
12.6
12.6
12.6
12.6
11.8
11.8
11.919
11.919
9.72
9.72
6.9
6.9
11.2
10.6
10.6
11.3
11.39
11.39
11.39
11.39
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.22
7.1
11.2
151/167
Noeud 1
Nom
1130KUMA
1150TAFO
1150TAFO
1170KPON
1170KPON
1190KPON
1200ASAW
1200ASAW
1230HO
1240KPEV
1250KPAN
1300BOGO
1300BOGO
1300BOGO
1310SOGA
1360ESSI
1360ESSI
1370MALL
1370MALL
1390DCEM
1390DCEM
1010AKOS
1320ABOA
1090TARK
1320ABOA
1320ABOA
1501G1
1502G2
1503G3
1100PRES
1100PRES
1139K2BS
1139K2BS
3010LOME
3010LOME
1060WINN
1060WINN
1280TAMA
1280TAMA
1380SAWL
1580N_AB
1580N_AB
1140NKAW
1110DUNK
15533BSP
15533BSP
15533BSP
1370MALL
1370MALL
1590KIN
1139K2BS
1139K2BS
1750BONY
1340WA
1630HAN
1620TUMU
1850ATEB
1990AYAN
1990AYAN
1500BUI
1278MIM
1278MIM
1610BUIP
1610BUIP
1130KUMA
1130KUMA
1130KUMA
1700ASOG
1700ASOG
1700ASOG
1700ASOG
1700ASOG
1700ASOG
ABOA_330
1020VOLT
1020VOLT
1750BONY
1750BONY
1350YEND
1070C-CO
1095NEWT
Noeud 2
Nom
1131KUMA
1151TAF0
1152TAFO
1171KPON
1171KPON
1195KPON
1201ASAW
1202ASAW
1231HO-1
1241KPEV
1251KPAN
1301BOGO
1301BOGO
1301BOGO
1311SOGA
1361ESSI
1361ESSI
1371MALL
1371MALL
1391DCEM
1391DCEM
1017AKOS
1327ABOA
1092ATAR
ABOA_330
ABOA_330
1500BUI
1500BUI
1500BUI
PRES330
PRES330
KSI330
KSI330
30101LOM
30101LOM
1061BWIN
1061AWIN
1281ATAM
1281BTAM
1381SAWL
1581N-AB
1581N-AB
1143NKAW
1111DUNK
15543BLV
15553BLV
15543BLV
1372MALL
1372MALL
1591KIN
11391K2L
11392K2L
17501BON
1341WA
1631HAN
1621TUMU
1852ATEB
1998AYAN
1995AYAN
1511BUIL
1279MIM
1279MIM
1611BUIP
1611BUIP
1133KUM1
1133KUM2
1132KUMA
1701ASO5
1701ASO1
1701ASO2
1701ASO3
1701ASO4
1701ASO6
ABOA3CC1
1029VOLT
1029VOLT
1757G
1758G
1351YEND
1071BCCO
10951NTA
V1
kV
161
161
161
161
161
161
161
161
69
69
69
161
161
161
69
161
161
161
161
161
161
161
161
161
161
161
14.4
14.4
14.4
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
330
161
161
161
161
161
161
161
V2
kV
34.5
34.5
34.5
34.5
34.5
11.5
34.5
34.5
11.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
11.5
34.5
34.5
330
330
161
161
161
330
330
330
330
330
330
34.5
34.5
34.5
34.5
34.5
11
11
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
11.5
11.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
13.8
13.8
13.8
13.8
13.8
13.8
13.8
330
330
13.8
13.8
34.5
34.5
11.5
SN
MVA
66
33
33
33
33
5
66
66
7
13
20
33
33
33
15
33
33
66
66
25
33
13.3
13.3
33
200
200
160
160
160
200
200
200
200
200
200
33
33
66
66
13.3
53
53
33
13.3
145
145
145
66
66
13.3
66
66
13.3
13.3
13.3
13.3
13.3
53
53
13.3
33
33
33
33
66
66
66
55
55
55
55
55
55
175
200
200
155
155
13.3
66
33
Zcc
%pu
11.2
11.21
11.21
10.9
10.9
9.15
11.3
11.3
11.8
8.36
11.28
10.56
10.56
10.56
8.21
10.13
10.13
11.3
11.3
8.49
10.9
11
9.97
11.22
9
9
13
13
13
9
9
9
9
9
9
11.2
11.2
11.3
11.3
11.3
11.8
11.8
11.22
11.31
11.3
11.3
11.3
11.3
11.3
11.31
11.3
11.3
11.31
11.3
11.3
11.3
11.31
11.8
11.8
11.31
11.2
11.2
11.22
11.22
11.2
11.2
11.2
11.3
11.3
11.3
11.3
11.3
11.3
11
9
9
12.6
12.6
11.3
11.3
10.6
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
BALI1_11
BALI1_11
DARSATAC
DARSAL1G
DARSAL5G
DARSAL6G
DARSAL7G
DARSAL8G
NIONO_1G
BOUGO_1G
KODIAL03
SEGOU_03
SEGOU_03
KENIE_1G
KENIE_2G
KENIE_3G
FELOU_1G
FELOU_2G
KOUTIA1G
SOSUMA1G
VICABO1G
ALBATR1G
CAPEB10G
SENDOU1G
KOUNOU08
TAMBAC03
DAGANA03
CAPEBI08
KOUTIA2G
FELOU_3G
SIKASSO1
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1010AKOS
1031SMEL
1031SMEL
1032SMEL
1032SMEL
1033SMEL
1034SMEL
1035SMEL
1036SMEL
1190KPON
1190KPON
1190KPON
1190KPON
1320ABOA
1320ABOA
1320ABOA
1320ABOA
1320ABOA
1413KENY
1413KENY
1600OPB1600OPB1809ELUB
1809ELUB
1470TT1P
1470TT1P
1309WEXF
1095NEWT
1095NEWT
1480ZEB
1040TEMA
1040TEMA
1040TEMA
1040TEMA
1040TEMA
1050ACHI
1050ACHI
1050ACHI
1050ACHI
1050ACHI
1080TAKO
1080TAKO
1090TARK
1100PRES
1130KUMA
Noeud 2
Nom
1092BTAR
1261TECH
1250KPAN
1473TT1P
1758BON3
1758BON3
1211JUAB
1211JUAB
1022SM2L
1022SM2L
1181AKON
1181BKON
1211DNOB
1211DNOB
1591KIN3
BOLGA330
1143NKAW
1261TECH
13091WEX
1251KPAN
2011ABOB
2011ABOB
2011ABOB
2011ABOB
2170AYAM
2180AYAM
2061FERK
2101MAN2071SUBR
2091BUYO
2090BUYO
2090BUYO
2041KOSS
2040KOSS
2040KOSS
2041KOSS
2031TAAB
2031TAAB
2030TAAB
2030TAAB
2030TAAB
2210RIVI
2021VRID
2021VRID
2021VRID
2021VRID
2021VRID
2021VRID
2020VRID
2020VRID
2500AZIT
2500AZIT
2111LABO
2081PEDR
2081PEDR
2091BUYO
2170AYAM
2180AYAM
2021VRID
2020VRID
2231YOPO
2231YOPO
3060NANG
3060NANG
3LOME161
4KODEN33
4KODEN33
4ZAGTO90
4ZAGTO90
4KOSSO33
4KOSSO15
4OUAG115
4OUAG215
4BOB2_15
4BOB2_15
4BOB1_15
4BOB1_15
4OUAG215
4OUAG215
4OUAG115
4OUAG115
V1
kV
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
69
225
225
225
225
5.5
5.5
225
225
225
225
10.5
10.5
225
17
17
17
225
225
13.8
13.8
13.8
225
225
225
225
11
11
11
11
11
15.75
15.75
225
225
225
10.5
5.5
5.5
15
15
225
225
10.3
10.3
11
225
225
225
225
90
90
90
90
33
33
33
33
33
33
33
33
V2
kV
34.5
34.5
69
13.8
330
330
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
330
330
34.5
34.5
34.5
34.5
90
90
90
90
90
90
90
90
90
90
225
225
90
225
225
90
90
90
225
225
225
90
90
90
90
90
90
90
225
225
225
225
90
90
90
90
90
90
90
225
90
90
161
161
161
33
33
90
90
33
15
15
15
15
15
15
15
15
15
15
15
SN
MVA
66
33
90
141
200
200
33
33
145
145
33
33
33
33
200
200
33
33
33
20
70
70
70
70
15
19
65
70
70
70
61
61
65
72
72
72
70
70
82.5
82.5
82.5
70
70
70
70
51
51
51
61
61
190
190
50
65
70
82.5
15
19
151
151
100
100
35.5
35.5
32
40
40
70
70
40
40
40
40
10
10
10
10
15
15
15
15
Zcc
%pu
11.3
11.22
11.3
6.9
9
9
11.2
11.2
11.3
11.3
11.22
11.22
11.21
11.21
9
9
11.22
11.22
11.2
11.28
10.15
10.245
10.245
10.245
11.5
9.7
10.17
10.16
10.13
10.1
10.96
10.95
10.25
13.3
13.3
14.05
10.3
10.3
12.47
12.53
12.53
10.4
10.3
10.3
10.3
11
11
11
11.53
11.53
12.5
12.5
10.22
10.16
10.16
11.53
11.5
9.7
11
12
10.15
10.15
13
13
10.5
17.5
17.5
16.5
16.5
11.2
11.4
11.4
11.4
7
7
6.68
6.68
10
10
10
10
152/167
Noeud 1
Nom
4OUAG133
4PTDO132
4PTDO132
4PTDO132
4KOSSO33
4KOSSO33
4BAGR132
4BAGR132
4KOMP132
4KOMP132
4BOB1_15
4BOB1_15
4BOB1_15
4BOB1_15
4BOB2_15
4BOB2_15
4BOB2_33
4BOB2_33
4BOB2_33
4KOSSO33
4KOSSO33
4KOSSO33
4KOSSO33
4KOSSO33
4KOSSO33
4OUAG215
4OUAG215
4OUAG215
4OUAG215
4OUAG215
4OUAG115
4OUAG115
4OUAG115
1040TEMA
12951BOL
20NTAG82
20NTAG83
2371BUND
3NEWIPP
KOMSILG5
2NEWCC-1
2NEWCC-2
2209RIVI
KOMSILG6
KOMSILG4
2050BOUA
2050BOUA
2040KOSS
3010LOME
3010LOME
3010LOME
3030COTO
NATITI04
3030COTO
PARAKO04
3010LOME
3KARA161
MA_GLE04
MA_GLE04
MA_GLE04
MA_GLE04
MA_GLE04
MA_GLE04
MA_GLE04
MA_GLE04
3030COTO
3030COTO
KANDI_04
MANGO_04
KANDI_04
MA_GLE04
MA_GLE04
MA_GLE04
3040SAKA
3040SAKA
2209RIVI
2209RIVI
2209RIVI
2020VRID
BISSAU03
MALANV02
Noeud 2
Nom
4OUAG115
4PTDOI33
4PTDOI33
4PTDOI33
4KOSSO15
4KOSSO15
4BAGRE_6
4BAGRE_6
4KOMPI_6
4KOMPI_6
4BOB11_5
4BOB12_5
4BOB13_5
4BOB14_5
4BOB21_5
4BOB22_5
4BOB23_5
4BOB24_5
4BOB25_5
4KOS1_11
4KOS2_11
4KOS3_11
4KOS4_11
4KOS5_11
4KOS6_11
4OUA21_5
4OUA22_5
4OUA23_5
4OUA24_5
4OUA25_5
4OUA11_6
4OUA12_6
4OUA13_6
1040TGEN
1290BOLG
2021VRID
2021VRID
2370BUND
3LOME161
4ZAGTO33
2209RIVI
2209RIVI
2210RIVI
4ZAGTO33
4ZAGTO33
2340BOUA
2340BOUA
2041KOSS
CONTOU1G
CONTOU1G
CONTOU1G
AKPAKP1G
NATITI1G
PORTON1G
PARAKO1G
LOME__1G
KARA__1G
CAI___1G
CAI___2G
CAI___3G
CAI___4G
CAI___5G
CAI___6G
CAI___7G
CAI___8G
IPPSOL1G
IPPTHE1G
SOLBEN1G
SOLTOG1G
ADFSOL1G
MA_GLE1G
MA_GLE2G
MA_GLE3G
SAKETE02
SAKETE02
RIVIER02
RIVIER02
2210RIVI
2021VRID
BISSAU1G
MALANV04
V1
kV
33
132
132
132
33
33
132
132
132
132
15
15
15
15
15
15
33
33
33
33
33
33
33
33
33
15
15
15
15
15
15
15
15
161
225
15
15
225
11
11
15.75
15.75
225
11
11
225
225
225
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
225
225
225
225
225
330
V2
kV
15
33
33
33
15
15
6.6
6.6
6.6
6.6
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
11
11
11
11
11
11
5.5
5.5
5.5
5.5
5.5
6.3
6.3
5.5
11
161
90
90
90
161
33
225
225
90
33
33
90
90
90
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
330
330
330
330
90
90
30
161
SN
MVA
15
10
10
10
15
15
10
10
10
10
2
2
2
2
4.75
4.75
5
5
5
5
8
8
10
10
23
6.6
6.6
6.6
10.65
10.65
4
4
5
75
200
151
151
50
32
22.5
190
190
70
22.5
15.62
70
70
65
63
63
20
37.5
15
15
32
20
25
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
25
125
6.25
6.25
6.25
190
190
190
200
200
200
200
70
70
20
90
Zcc
%pu
10
10
10
10
10
10
10
10
10
10
6
6.5
6.5
6
7
7.06
6.88
7.87
6.88
7.15
9.89
9.89
8.58
8.58
10.68
8
8
8
8
8
7.43
7.43
7.92
10
11.3
11
11
10.22
10.5
10.68
12.5
12.5
10.4
10.68
10.68
10.18
10.18
10.25
11.6
11.6
8
8
8
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
12
12
9
9
10.4
10.3
8
8
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
1090TARK
1260TECH
1252KPAN
1470TT1P
1750BONY
1750BONY
1210JUAB
1210JUAB
1021SME2
1021SME2
1180KONO
1180KONO
1210N-OB
1210N-OB
1590KIN
1290BOLG
1140NKAW
1260TECH
1309WEXF
1250KPAN
2010ABOB
2010ABOB
2010ABOB
2010ABOB
2172AYAM
2181AYAM
2060FERK
2100MAN2070SOUB
2090BUYO
2093BUYO
2094BUYO
2040KOSS
2043KOSS
2042KOSS
2044KOSS
2030TAAB
2030TAAB
2032TAAB
2033TAAB
2034TAAB
2209RIVI
2020VRID
2020VRID
2020VRID
2024VRID
2025VRID
2026VRID
2023VGT2022VGT2501AZI
2502AZI
2110LABO
2080S-PE
2080S-PE
2092BUYO
2171AYAM
2182AYAM
20NGTAG8
2027VRID
2229YOPO
2229YOPO
3061NANG
3062NANG
3NGLOG12
4KODE225
4KODE225
4ZAGT225
4ZAGT225
4KOSSO90
4KOSSO90
4OUAG190
4OUAG290
4BOB2_33
4BOB2_33
4BOB1_33
4BOB1_33
4OUAG233
4OUAG233
4OUAG133
4OUAG133
Noeud 2
Nom
OUAGAE03
OUAGAE03
OUAGAE08
OUAGAE08
PATDOI08
SAMBANG1
SAMBANG2
SAMBANG3
SAMBANG4
KALETAG1
KALETAG2
KALETAG3
SELING05
FOMI__G1
FOMI__G2
FOMI__G3
BRIKAM03
TAMBAC12
1326ABOA
SASO2CC1
SASO2CC2
4ZAGTO33
4ZAGTO33
4ZAGTO33
4BOB2_33
4BOB2_33
4BOB2_33
GOUDELG1
GOUDELG2
GOUDELG3
GOUDELG4
ICSPOWG1
ICSPOWG2
ICSPOWG3
ICSPOWG4
ICSPOWG5
ICSPOWG6
BONMOBG1
BONMOBG2
BONMOBG3
CHEVROG1
CHEVROG2
CHEVROG3
TOTALFG4
TOTALFG3
TOTALFG2
TOTALFG1
WESTCOG1
WESTCOG2
WESTCOG3
WESTCOG4
IBOMP2G1
IBOMP2G2
IBOMP2G3
IBOMP2G4
FARMELEG
2020VRID
2020VRID
BALING10
MATOTO07
BISSAU1G
GBARANT2
GBARANT2
MAMBIG01
MAMBIL02
MAMBIL02
MAMBIL02
MAMBIG02
MAMBIG03
MAMBIG04
MAMBIG05
MAMBIG06
MAMBIG07
MAMBIG08
ZUNGERG1
ZUNGERG2
ZUNGERG3
ZUNGERG4
SALKADG2
SALKADG3
MAMBIL02
V1
kV
330
330
225
225
132
225
225
225
225
225
225
225
225
225
225
225
30
225
161
161
161
11
11
11
11
11
0.4
132
132
132
132
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
330
15
15
15
60
225
330
132
330
760
760
760
330
330
330
330
330
330
330
330
330
330
330
330
330
760
V2
kV
225
225
90
90
90
13.2
13.2
13.2
13.2
10.3
10.3
10.3
150
10.3
10.3
10.3
225
15
13.8
13.8
13.8
33
33
33
33
33
33
20
20
20
20
15
15
15
15
15
15
15
15
15
16
16
16
15
15
15
15
15
15
15
15
15
15
15
15
15
225
225
30
110
30
1
1
15
330
330
330
15
15
15
15
15
15
15
15.65
15.65
15.65
15.65
10.5
10.5
330
SN
MVA
150
150
100
100
75
40
37.5
37.5
37.5
90
90
90
150
37.5
37.5
37.5
50
10
155
225
225
22.5
23
15.62
13
13
4
7.5
7.5
7.5
7.5
125
125
125
125
125
125
162.5
162.5
162.5
312.5
312.5
312.5
156.25
156.25
156.25
156.25
156.25
156.25
156.25
156.25
156.25
156.25
156.25
156.25
187.5
151
151
15
25
20
150
150
550
1000
1000
1000
550
550
550
550
550
550
550
220
220
220
220
85
85
1000
Zcc
%pu
8
8
8
8
10
10
10
10
10
10
10
10
10
10
10
10
10
10
12.6
11.3
11.3
10.68
10.68
10.68
6.88
6.88
6.88
9.8533
9.8533
9.8533
9.8533
10
10
10
10
10
10
13
13
13
10.22
10.22
10.22
10
10
10
10
10
10
10
10
10
10
10
10
10
12
12
7.1
5.6
8
12
-1.99745
13
10
10
10
13
13
13
13
13
13
13
12.85
12.85
12.85
12.85
12
12
10
153/167
Noeud 1
Nom
1200ASAW
1230HO
1310SOGA
1380SAWL
1139K2BS
1309WEXF
1870CAPE
1870CAPE
1870CAPE
1850BERE
1850BERE
1480ZEB
1350YEND
1340WA
1590KIN
1620TUMU
1630HAN
1500BUI
1750BONY
1850ATEB
1010AKOS
1240KPEV
1110DUNK
1561A4BS
1561A4BS
1561A4BS
1561A4BS
1110DUNK
NIAM2_06
3050ONIG
SOUBREG1
SOUBREG2
SOUBREG3
BOUTOUBG
GOUINA1G
GOUINA2G
GOUINA3G
ADJARAG1
ADJARAG2
ADJARAG3
KANDAD06
KANDAD06
KANDAD06
KANDAD06
CAPE330
12951BOL
1350YEND
LABE__03
AMARYA03
AMARYA03
AMARYA03
AMARYA03
LINSAN03
BIKONG03
YIBEN_03
BUMBUN03
MANO__03
MANO__03
STPAUL03
STPAUL03
STPAUL03
STPAUL03
MARKALAG
BADOUMG1
BADOUMG2
GRIBOPOG
ABOCOMG1
ABOCOMG2
ABOCOMG3
TIBOTOG1
TIBOTOG2
TIBOTOG3
SENDOU2G
SENDOU3G
KODIAL03
KOUNOU08
KOUNOU08
KOUNOU08
LINSAN03
MATOTO03
MATOTO03
Noeud 2
Nom
1202ASAW
1231HO-1
1311SOGA
1381SAWL
11392K2L
13091WEX
1871CAPL
1871CAPL
CAPE330
1851BERL
1851BERL
1481Z-LV
1351YEND
1341WA
1591KIN
1621TUMU
1631HAN
1511BUIL
17501BON
1852ATEB
1017AKOS
1241KPEV
1111DUNK
1560A4BS
1560A4BS
1562A4BS
1562A4BS
1115DUNK
DYODYONG
KETOU__G
2070SOUB
2070SOUB
2070SOUB
2070SOUB
KAYES_03
KAYES_03
KAYES_03
ADJARA04
ADJARA04
ADJARA04
KANDADG1
KANDADG2
KANDADG3
KANDADG4
HEMANGG
PWALUGUG
JUALE__G
DIGAN__G
AMARYAG1
AMARYAG2
AMARYAG3
AMARYAG4
KASSAB_G
BENKONGG
BUMBUN3G
BUMBU45G
MANORIG1
MANORIG2
SPAULG11
SPAULG21
SPAULG12
SPAULG22
SEGOU_05
BADOUM03
BADOUM03
2070SOUB
2140BONG
2140BONG
2140BONG
TIBOTO03
TIBOTO03
TIBOTO03
SENDOU03
SENDOU03
KODIAL05
KOUNOU03
KOUNOU03
KOUNOU03
LAFOU__G
MATOTO07
MATOTO07
V1
kV
161
69
69
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
161
69
161
161
161
161
161
161
132
161
10.5
10.5
10.5
10.5
11
11
11
10.3
10.3
10.3
132
132
132
132
330
225
161
225
225
225
225
225
225
225
225
225
225
225
225
225
225
225
2
11
11
10.5
5.5
5.5
5.5
10.5
10.5
10.5
6.6
6.6
225
90
90
90
225
225
225
V2
kV
34.5
11.5
34.5
34.5
34.5
34.5
34.5
34.5
330
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
34.5
11.5
34.5
34.5
330
330
34.5
34.5
330
20
10.3
225
225
225
225
225
225
225
161
161
161
20
20
20
20
13.8
13.8
13.8
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
150
225
225
225
90
90
90
225
225
225
225
225
150
225
225
225
10.3
110
110
SN
MVA
66
7
20
13.3
66
33
66
66
200
33
33
33
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13
13.3
500
500
145
145
200
33
200
120
120
120
190
59
59
59
54
54
54
40
40
40
40
115
60
110
117
90
90
90
90
169
107
115
120
115
115
50
75
50
75
13
47
47
140
38
38
38
94
94
94
157
157
75
75
75
75
117
75
75
Zcc
%pu
11.3
11.8
8.21
11.3
11.3
11.2
11.3
11.3
9
11.22
11.22
11.3
11.3
11.3
11.31
11.3
11.3
11.31
11.31
11.31
11
8.36
11.31
9
9
11.3
11.3
9
9.8533
13
11.53
11.53
11.53
11.53
12
12
12
13
13
13
9.8533
9.8533
9.8533
9.8533
11
11
11
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
5.88
5.88
11.53
9.7
9.7
9.7
11.53
11.53
11.53
10
10
12
7.49
7.49
7.49
10
10
10
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
OUAGAE02
OUAGAE02
OUAGAE03
OUAGAE03
4PTDO132
SAMBAG03
SAMBAG03
SAMBAG03
SAMBAG03
KALETA03
KALETA03
KALETA03
SELING03
FOMI__03
FOMI__03
FOMI__03
BRIKAM1G
TAMBAC03
1320ABOA
1700ASOG
1700ASOG
KOMSILG1
KOMSILG2
KOMSILG3
BOB2_2G1
BOB2_2G2
SMALLHYD
NIAM2_06
NIAM2_06
NIAM2_06
NIAM2_06
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
IKOTAB02
IKOTAB02
IKOTAB02
EGBIN_02
EGBIN_02
EGBIN_02
ALAOJI02
ALAOJI02
ALAOJI02
ALAOJI02
ERUNKA02
ERUNKA02
ERUNKA02
ERUNKA02
IKOTAB02
IKOTAB02
IKOTAB02
IKOTAB02
IKEJAW02
2028VRID
2029VRID
BALI1_11
MATOTO_D
BISSAU03
GBARAN02
GBARAN06
MAMBIL02
MAMBIL01
MAMBIL01
MAMBIL01
MAMBIL02
MAMBIL02
MAMBIL02
MAMBIL02
MAMBIL02
MAMBIL02
MAMBIL02
ZUNGER02
ZUNGER02
ZUNGER02
ZUNGER02
SALKAD02
SALKAD02
MAMBIL01
Noeud 2
Nom
GOZOGUEG
BONKONDG
FRANKO_G
POUDADLG
BISSAU1G
1041T-LV
1051ACH
IKOTAB06
IKOTABT3
MONROV_D
MATOTO07
MATOTO_D
KOUNOU03
BALASSAG
KOUKOUTG
BOUREYAG
DIAREGUG
V1
kV
225
225
225
225
225
161
161
1
330
66
60
20
90
225
225
225
225
V2
kV
10.3
10.3
10.3
10.3
30
34.5
34.5
132
1
33
110
60
225
10.3
10.3
10.3
10.3
SN
MVA
60
190
45
113
20
66
66
150
150
20
25
50
75
225
351
225
90
Zcc
%pu
10
10
10
10
8
11.39
11.3
-1.99745
12
10
5.6
11.9
7.49
10
10
10
10
Noeud 1
Nom
BEYLA_03
MALI__03
MALI__03
LABE__03
LABE__03
3010LOME
3010LOME
3010LOME
1040TEMA
1700ASOG
1021SME2
1021SME2
BENINN02
BENINN02
BENINN02
BENINN02
Noeud 2
Nom
NZEBELAG
KOURAVEG
KOUYA__G
FETORE_G
GRKINKOG
CCTOGOG1
CCTOGOG2
CCTOGOG3
1041T-LV
SASOCC3
BTPP__G1
CEMPOWEG
ETHIOPG3
ETHIOPG4
ETHIOPG2
ETHIOPG1
V1
kV
225
225
225
225
225
161
161
161
161
161
161
161
330
330
330
330
V2
kV
10.3
10.3
10.3
10.3
10.3
15
15
15
34.5
13.8
13.8
13.8
17
17
17
17
SN
MVA
60
169
107
155
365
190
190
190
66
225
320
320
356
356
356
356
Zcc
%pu
10
10
10
10
10
10
10
10
11.39
11.3
11.3
11.3
13
13
13
13
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Noeud 1
Nom
NZEREK03
LABE__03
NZEREK03
BOKE__03
BISSAU03
1040TEMA
1050ACHI
IKOTABT3
IKOTAB02
MONROV09
MATOTO_D
TOMBO__D
KOUNOU08
LINSAN03
KOUKOU03
BOUREY03
KOROUS03
154/167
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
9.
ANNEXE: ETUDE DE STABILITE: MODELE
DYNAMIQUE PSA POUR LANNEE 2015 :
DONNEES GENERATION
155/167
Generateurs
Machine
Nom
KAHONG71
KAHONG72
KAHONG73
KAHONG74
B_AIRG61
B_AIRG62
B_AIRG63
B_AIRG64
B_AIRT4A
CAPDB11A
CAPDB13A
CAPDB14A
CAPDB144
CAPDB145
CAPDB19A
CAPDB1G3
CAPDB17A
CAPDB15A
CAPDB18A
KOUN_1G1
KOUN_1G2
KOUN_1G3
KOUN_1G4
KOUN_1G5
KOUN_1G6
KOUN_1G7
KOUN_1G8
KOUN_1G9
GTI_111A
GTI_113A
TOBIN_1G
BELAIR1G
BELAIR2G
BELAIR3G
SENDOU1G
KOUDI_1G
KOUDI_2G
Noeud
Nom
KAHONE2G
KAHONE2G
KAHONE1G
KAHONE1G
BELAIR11
BELAIR11
BELAIR11
BELAIR11
BELAIR1G
CAPEBI4G
CAPEBI5G
CAPEBI6G
CAPEBI1G
CAPEBI1G
CAPEBI3G
CAPEBI2G
CAPEBI9G
CAPEBI8G
CAPEBI7G
KOUNOU11
KOUNOU11
KOUNOU11
KOUNOU11
KOUNOU11
KOUNOU11
KOUNOU11
KOUNOU11
KOUNOU11
GTI___1G
GTI___1G
CAPEB10G
BELAIR11
BELAIR11
BELAIR11
SENDOU1G
TAMBAC11
TAMBAC11
Pays
Nom
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SE
SN
MVA
17.0
17.0
17.0
17.0
18.0
18.0
18.0
18.0
33.0
26.0
24.0
24.0
19.0
19.0
25.0
30.0
34.0
38.0
38.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
44.0
21.0
50.0
19.0
19.0
88.0
156.0
19.0
19.0
VN
kV
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
11.0
6.6
6.6
6.6
11.0
11.0
6.6
6.6
6.6
6.6
6.6
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
11.0
11.0
6.6
15.0
15.0
15.0
6.7
15.0
15.0
PN turb
MW
15.0
15.0
15.0
15.0
16.0
16.0
16.0
16.0
32.0
21.0
19.0
19.0
15.0
15.0
20.0
24.0
28.0
30.0
30.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
35.0
17.0
40.0
15.0
15.0
70.0
125.0
15.0
15.0
PN alt
MW
15.0
15.0
15.0
15.0
16.0
16.0
16.0
16.0
32.0
21.0
19.0
19.0
15.0
15.0
20.0
24.0
28.0
30.0
30.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
35.0
17.0
40.0
15.0
15.0
70.0
125.0
15.0
15.0
Rs
pu
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.005
0.005
0.005
0.005
0.000
0.005
0.005
Xs
pu
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.180
0.140
0.140
0.140
0.140
0.140
0.180
0.180
0.110
0.110
0.110
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.180
0.180
0.140
0.140
0.140
0.140
0.221
0.140
0.140
Xd
pu
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.300
1.710
1.480
1.480
2.000
2.000
2.300
2.300
2.050
1.800
1.800
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.300
2.300
2.000
2.000
2.000
2.000
1.905
2.000
2.000
X'd
pu
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.314
0.380
0.380
0.300
0.300
0.300
0.300
0.180
0.180
0.180
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.319
0.300
0.300
156/167
X''d
pu
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.220
0.238
0.280
0.280
0.200
0.200
0.220
0.220
0.120
0.120
0.120
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.220
0.220
0.200
0.200
0.200
0.200
0.276
0.200
0.200
Xq
pu
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.005
0.005
0.005
0.005
0.000
0.005
0.005
X'q
pu
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
2.200
1.100
0.960
0.960
1.900
1.900
2.200
2.200
2.050
1.800
1.800
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
2.200
2.200
1.900
1.900
1.900
1.900
1.715
1.900
1.900
X''q
pu
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.250
---------0.275
0.275
0.250
0.250
---------0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.250
0.250
0.275
0.275
0.275
0.275
0.319
0.275
0.275
T'do
s
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
8.00
4.11
5.30
5.30
6.20
6.20
8.00
8.00
4.00
4.30
4.30
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
8.00
8.00
6.20
6.20
6.20
6.20
5.00
6.20
6.20
T''do
s
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
0.09
0.03
0.03
0.03
0.03
0.02
0.02
0.05
0.05
0.05
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
0.02
0.03
0.03
0.03
0.03
0.05
0.03
0.03
T'qo
s
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
---------0.50
0.50
0.50
0.50
---------0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.15
1.50
AC1IEEE+
1
DIESEL
2
0.04
2.00
AC1IEEE+
1
DIESEL
2
0.04
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.70
AC1IEEE+
1
GOVCLAS
1
0.05
4.30
AC1IEEE+
1
GOVCLAS
1
0.05
4.30
AC1IEEE+
1
GOVCLAS
1
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.01
2.00
AC1IEEE+
1
GAST
2
0.01
2.00
AC1IEEE+
1
PMCONST
1
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.05
6.00
AC1IEEE+
1
GOVCLAS
1
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
9.1.
Noeud
Nom
ZIGUIN03
TAMBAC12
DAGANA11
DAGANA11
BRIKAM1G
BISSAU1G
TB3G1
TB3G2
TB3G3
TB3G4
TB5G1
TB5G2
TB5G3
MANEAHG1
MANEAHG2
MANEAHG3
GARAFIG1
GARAFIG2
GARAFIG3
GRCHUTG1
GRCHUTG2
GRCHUTG3
GRCHUTG4
SAMBANG1
SAMBANG2
SAMBANG3
SAMBANG4
FOMI__G1
FOMI__G2
FOMI__G3
DONKEAG1
DONKEAG2
KALETAG1
KALETAG2
KALETAG3
MANANT5G
MANANT4G
MANANT3G
MANANT2G
MANANT1G
SELING1G
SELING1G
SELING1G
Pays
Nom
SE
SE
SE
SE
GA
GB
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
GU
MA
MA
MA
MA
MA
MA
MA
MA
SN
MVA
13.0
10.0
19.0
19.0
130.0
36.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
52.0
52.0
52.0
32.0
32.0
32.0
6.0
6.0
11.0
11.0
40.0
40.0
40.0
40.0
38.0
38.0
38.0
8.0
8.0
94.0
94.0
94.0
47.0
47.0
47.0
47.0
47.0
14.0
14.0
14.0
VN
kV
225.0
15.0
15.0
15.0
30.0
30.0
6.3
6.3
6.3
6.3
11.0
11.0
11.0
11.0
11.0
11.0
5.7
5.7
5.7
3.3
3.3
5.5
5.5
13.2
13.2
13.2
13.2
10.3
10.3
10.3
6.3
6.3
10.3
10.3
10.3
11.0
11.0
11.0
11.0
11.0
8.7
8.7
8.7
PN turb
MW
10.0
8.0
15.0
15.0
104.0
29.0
12.0
12.0
12.0
12.0
11.0
11.0
11.0
42.0
42.0
42.0
25.0
25.0
25.0
5.0
5.0
9.0
9.0
32.0
32.0
32.0
32.0
30.0
30.0
30.0
8.0
8.0
80.0
80.0
80.0
40.0
40.0
40.0
40.0
40.0
12.0
12.0
12.0
PN alt
MW
10.0
8.0
15.0
15.0
104.0
29.0
12.0
12.0
12.0
12.0
11.0
11.0
11.0
42.0
42.0
42.0
25.0
25.0
25.0
5.0
5.0
9.0
9.0
32.0
32.0
32.0
32.0
30.0
30.0
30.0
8.0
8.0
80.0
80.0
80.0
40.0
40.0
40.0
40.0
40.0
12.0
12.0
12.0
Rs
pu
0.005
0.005
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.048
0.048
0.048
0.048
0.048
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
Xs
pu
0.140
0.140
0.180
0.180
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.180
0.180
0.180
0.180
0.180
0.167
0.167
0.167
0.167
0.167
0.167
0.167
0.167
Xd
pu
2.000
2.000
2.300
2.300
2.000
2.000
2.000
2.000
2.000
2.000
2.130
2.130
2.130
2.000
2.000
2.000
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.994
0.882
0.882
0.882
0.882
0.882
1.000
1.000
1.000
1.000
1.000
0.994
0.994
0.994
X'd
pu
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.380
0.380
0.380
0.300
0.300
0.300
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.268
0.320
0.320
0.320
0.320
0.320
0.300
0.300
0.300
0.300
0.300
0.268
0.268
0.268
157/167
X''d
pu
0.200
0.200
0.220
0.220
0.200
0.200
0.200
0.200
0.200
0.200
0.249
0.249
0.249
0.200
0.200
0.200
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.185
0.270
0.270
0.270
0.270
0.270
0.250
0.250
0.250
0.250
0.250
0.185
0.185
0.185
Xq
pu
0.005
0.005
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.048
0.048
0.048
0.048
0.048
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
X'q
pu
1.900
1.900
2.200
2.200
1.900
1.900
1.900
1.900
1.900
1.900
1.110
1.110
1.110
1.900
1.900
1.900
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.767
0.600
0.600
0.600
0.600
0.600
0.650
0.650
0.650
0.650
0.650
0.767
0.767
0.767
X''q
pu
0.275
0.275
0.250
0.250
0.275
0.275
0.275
0.275
0.275
0.275
---------0.275
0.275
0.275
----------------------------------------------------------------------------------
T'do
s
6.20
6.20
8.00
8.00
6.20
6.20
6.20
6.20
6.20
6.20
6.10
6.10
6.10
6.20
6.20
6.20
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
4.50
4.50
4.50
4.50
4.50
6.70
6.70
6.70
6.70
6.70
8.00
8.00
8.00
T''do
s
0.03
0.03
0.02
0.02
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.04
0.04
0.04
T'qo
s
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
---------0.50
0.50
0.50
----------------------------------------------------------------------------------
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.03
2.00
AC1IEEE+
1
DIESEL
2
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.11
2.00
AC1IEEE+
1
DIESEL
3
0.11
2.00
AC1IEEE+
1
DIESEL
3
0.11
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.04
2.80
EXST1
2
HYGOV
4
0.04
2.80
EXST1
2
HYGOV
4
0.04
2.80
EXST1
2
HYGOV
4
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.04
2.80
EXST1
2
HYGOV
5
0.05
2.80
EXST1
1
PIDGOV
5
0.05
2.80
EXST1
1
PIDGOV
5
0.05
2.80
EXST1
1
PIDGOV
5
0.05
2.80
EXST1
1
PIDGOV
5
0.05
2.80
EXST1
1
PIDGOV
5
0.05
2.80
AC1IEEE+
1
HYGOV
5
0.05
2.80
AC1IEEE+
1
HYGOV
5
0.05
2.80
AC1IEEE+
1
HYGOV
5
0.05
2.80
AC1IEEE+
1
HYGOV
5
0.05
2.80
AC1IEEE+
1
HYGOV
5
0.04
2.80
AC1IEEE+
1
HYGOV
5
0.04
2.80
AC1IEEE+
1
HYGOV
5
0.04
2.80
AC1IEEE+
1
HYGOV
5
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
ZIGUINCG
TAMBDIG1
ROSSBE1G
ROSSBE2G
GAMB_EQG
GBISSEQG
TOMBO3G1
TOMBO3G2
TOMBO3G3
TOMBO3G4
TOMBO5G1
TOMBO5G2
TOMBO5G3
MANEAHG1
MANEAHG2
MANEAHG3
GARAFIG1
GARAFIG2
GARAFIG3
GRCHUTG1
GRCHUTG2
GRCHUTG3
GRCHUTG4
SAMBANG1
SAMBANG2
SAMBANG3
SAMBANG4
FOMI__G1
FOMI__G2
FOMI__G3
DONKEAG1
DONKEAG2
KALETAG1
KALETAG2
KALETAG3
MANAN11A
MANAN12A
MANAN13A
MANAN14A
MANAN15A
SELING1
SELING2
SELING3
Noeud
Nom
SELING1G
FELOU_1G
FELOU_2G
FELOU_3G
KENIE_1G
KENIE_2G
KENIE_3G
BALI1_11
BALI1_11
BALI1_11
BALI1_11
DARSAL1G
DARSAL5G
DARSAL6G
DARSAL7G
DARSAL8G
SOPAM_1G
SOPAM_1G
SOPAM_1G
SOPAM_1G
SOPAM_1G
BALI1_11
BALI1_11
BALI1_11
BALI1_11
BALI1_11
BALI1_11
ALBATR1G
DARSATAC
VICABO1G
BUMBU1G1
BUMBU1G2
BUMBUN2G
KENEMA_D
KENEMA_D
KENEMA_D
FRTOWN04
FRTOWN04
FRTOWN04
FRTOWN04
FRTOWN04
FRTOWN04
FRTOWN04
Pays
Nom
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
MA
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SL
SN
MVA
14.0
25.0
25.0
25.0
18.0
18.0
18.0
8.0
8.0
8.0
6.0
5.0
7.0
7.0
8.0
5.0
14.0
14.0
14.0
14.0
14.0
12.0
12.0
12.0
12.0
12.0
12.0
75.0
27.0
38.0
32.0
32.0
50.0
8.0
8.0
6.0
9.0
8.0
6.0
6.0
9.0
9.0
9.0
VN
kV
8.7
11.0
11.0
11.0
8.7
8.7
8.7
15.0
15.0
15.0
15.0
5.5
5.5
5.5
5.5
0.4
8.7
8.7
8.7
8.7
8.7
15.0
15.0
15.0
15.0
15.0
15.0
11.0
11.0
8.7
13.8
13.8
13.8
33.0
33.0
33.0
161.0
161.0
161.0
161.0
161.0
161.0
161.0
PN turb
MW
12.0
20.0
20.0
20.0
14.0
14.0
14.0
6.0
6.0
6.0
5.0
4.0
5.0
6.0
6.0
4.0
12.0
12.0
12.0
12.0
12.0
10.0
10.0
10.0
10.0
10.0
10.0
66.0
25.0
30.0
25.0
25.0
40.0
6.0
6.0
5.0
7.0
6.0
5.0
5.0
8.0
8.0
8.0
PN alt
MW
12.0
20.0
20.0
20.0
14.0
14.0
14.0
6.0
6.0
6.0
5.0
4.0
5.0
6.0
6.0
4.0
12.0
12.0
12.0
12.0
12.0
10.0
10.0
10.0
10.0
10.0
10.0
66.0
25.0
30.0
25.0
25.0
40.0
6.0
6.0
5.0
7.0
6.0
5.0
5.0
8.0
8.0
8.0
Rs
pu
0.011
0.048
0.048
0.048
0.048
0.048
0.048
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.006
0.006
0.006
0.048
0.048
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
Xs
pu
0.167
0.180
0.180
0.180
0.180
0.180
0.180
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.180
0.180
0.145
0.145
0.145
0.180
0.180
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
Xd
pu
0.994
0.882
0.882
0.882
0.882
0.882
0.882
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.300
2.300
1.260
1.260
1.260
0.882
0.882
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
X'd
pu
0.268
0.320
0.320
0.320
0.320
0.320
0.320
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.310
0.310
0.310
0.320
0.320
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
158/167
X''d
pu
0.185
0.270
0.270
0.270
0.270
0.270
0.270
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.220
0.220
0.210
0.210
0.210
0.270
0.270
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
Xq
pu
0.011
0.048
0.048
0.048
0.048
0.048
0.048
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.006
0.006
0.006
0.048
0.048
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
X'q
pu
0.767
0.600
0.600
0.600
0.600
0.600
0.600
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
2.200
2.200
0.760
0.760
0.760
0.600
0.600
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
X''q
pu
---------------------0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.250
0.250
---------------0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
T'do
s
8.00
4.50
4.50
4.50
4.50
4.50
4.50
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
8.00
8.00
6.64
6.64
6.64
4.50
4.50
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
T''do
s
0.04
0.05
0.05
0.05
0.05
0.05
0.05
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
0.02
0.05
0.05
0.05
0.05
0.05
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
T'qo
s
---------------------0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
---------------0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.04
2.80
AC1IEEE+
1
HYGOV
5
0.05
2.80
AC1IEEE+
1
PIDGOV
6
0.05
2.80
AC1IEEE+
1
PIDGOV
6
0.05
2.80
AC1IEEE+
1
PIDGOV
6
0.05
2.80
AC1IEEE+
1
PIDGOV
7
0.05
2.80
AC1IEEE+
1
PIDGOV
7
0.05
2.80
AC1IEEE+
1
PIDGOV
7
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.05
2.80
EXST1
1
PIDGOV
2
0.05
2.80
EXST1
1
PIDGOV
2
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
SELING4
FELOU_1G
FELOU_2G
FELOU_3G
KENIE_1G
KENIE_2G
KENIE_3G
BALIN_G1
BALIN_G2
BALIN_G3
BALIN_G4
DARSAL1G
DARASLA5
DARASLA6
DARASLA7
DARSAL8G
SOPAM_01
SOPAM_02
SOPAM_03
SOPAM_04
SOPAM_05
BALBIDG1
BALBIDG2
BALBIDG3
BALBIDG4
BALBIDG5
BALBIDG6
ALBATR1G
DARSATAC
VICABO1G
BUMBU1G1
BUMBU1G2
BUMBUN2G
GOMA_HG1
GOMA_HG2
BO_DI_3G
KINGT1G1
KINGT1G2
KINGT2G1
KINGT2G2
BLACKHG1
BLACKHG2
BLACKHG3
Noeud
Nom
MTCOFFG1
MTCOFFG2
MTCOFFG3
MTCOFFG4
BUCHANG1
BUCHANG2
MONROV_D
MONROV_D
MONROV_D
MONROV_D
MONROV_D
MONROV_D
MONROV_D
MONROV_D
MONROV_D
2171AYAM
2172AYAM
2181AYAM
2182AYAM
2092BUYO
2093BUYO
2094BUYO
2042KOSS
2043KOSS
2044KOSS
2032TAAB
2033TAAB
2034TAAB
2022VGT2022VGT2023VGT2023VGT2024VRID
2025VRID
2026VRID
2027VRID
2028VRID
2029VRID
2501AZI
2502AZI
20NGTAG8
20NTAG82
20NTAG83
Pays
Nom
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
LI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
CI
SN
MVA
21.0
21.0
21.0
21.0
22.0
22.0
28.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
13.0
13.0
19.0
19.0
61.0
61.0
61.0
62.0
62.0
62.0
78.0
78.0
78.0
26.0
26.0
26.0
26.0
43.0
43.0
43.0
139.0
139.0
139.0
210.0
210.0
139.0
139.0
139.0
VN
kV
10.5
10.5
10.5
10.5
10.5
10.5
33.0
33.0
33.0
33.0
33.0
33.0
33.0
33.0
33.0
5.5
5.5
5.5
5.5
10.5
10.5
10.5
17.0
17.0
17.0
13.8
13.8
13.8
11.0
11.0
11.0
11.0
11.0
11.0
11.0
15.0
15.0
15.0
15.8
15.8
15.0
15.0
15.0
PN turb
MW
16.0
16.0
16.0
16.0
18.0
18.0
23.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
10.0
15.0
15.0
55.0
55.0
55.0
35.0
35.0
35.0
65.0
65.0
65.0
24.0
24.0
24.0
24.0
33.0
33.0
33.0
111.0
111.0
111.0
148.0
148.0
111.0
111.0
111.0
PN alt
MW
16.0
16.0
16.0
16.0
18.0
18.0
23.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
10.0
10.0
15.0
15.0
55.0
55.0
55.0
58.5
58.5
58.5
70.2
70.2
70.2
24.0
24.0
24.0
24.0
33.0
33.0
33.0
111.0
111.0
111.0
148.0
148.0
111.0
111.0
111.0
Rs
pu
0.006
0.006
0.006
0.006
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.011
0.011
0.011
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.013
0.013
0.002
0.002
0.002
Xs
pu
0.145
0.145
0.145
0.145
0.180
0.180
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.180
0.180
0.180
0.180
0.120
0.120
0.120
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.124
0.124
0.124
0.131
0.131
0.131
0.170
0.170
0.131
0.131
0.131
Xd
pu
1.260
1.260
1.260
1.260
2.300
2.300
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
1.210
1.210
1.120
1.120
1.010
1.010
1.010
0.900
0.900
0.900
0.900
0.900
0.900
2.580
2.580
2.580
2.580
2.290
2.290
2.290
1.670
1.670
1.670
2.530
2.530
1.670
1.670
1.670
X'd
pu
0.310
0.310
0.310
0.310
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.330
0.330
0.345
0.345
0.290
0.290
0.290
0.321
0.321
0.321
0.330
0.330
0.330
0.273
0.273
0.273
0.273
0.209
0.209
0.209
0.240
0.240
0.240
0.250
0.250
0.240
0.240
0.240
159/167
X''d
pu
0.210
0.210
0.210
0.210
0.220
0.220
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.220
0.220
0.225
0.225
0.205
0.205
0.205
0.231
0.231
0.231
0.255
0.255
0.255
0.199
0.199
0.199
0.199
0.199
0.199
0.199
0.166
0.166
0.166
0.190
0.190
0.166
0.166
0.166
Xq
pu
0.006
0.006
0.006
0.006
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.011
0.011
0.011
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.013
0.013
0.002
0.002
0.002
X'q
pu
0.760
0.760
0.760
0.760
2.200
2.200
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
1.900
0.700
0.700
0.700
0.700
0.690
0.690
0.690
0.640
0.640
0.640
0.650
0.650
0.650
2.500
2.500
2.500
2.500
2.072
2.072
2.072
1.603
1.603
1.603
2.360
2.360
1.603
1.603
1.603
X''q
pu
------------0.250
0.250
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
-------------------------------------------------------------------------------------
T'do
s
6.64
6.64
6.64
6.64
8.00
8.00
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
6.20
5.00
5.00
5.00
5.00
3.30
3.30
3.30
5.00
5.00
5.00
5.00
5.00
5.00
3.60
3.60
3.60
3.60
6.40
6.40
6.40
6.64
6.64
6.64
10.76
10.76
6.64
6.64
6.64
T''do
s
0.05
0.05
0.05
0.05
0.02
0.02
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.06
0.06
0.06
0.03
0.03
0.03
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.05
0.05
0.05
0.02
0.02
0.05
0.05
0.05
T'qo
s
------------0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
-------------------------------------------------------------------------------------
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.05
2.84
UNITROLA 1
MIPREG
1
0.05
2.84
UNITROLA 1
MIPREG
1
0.05
2.84
UNITROLA 2
MIPREG
2
0.05
2.84
UNITROLA 2
MIPREG
2
0.12
3.29
EXST1
1
MIPREG
3
0.12
3.29
EXST1
1
MIPREG
3
0.12
3.29
EXST1
1
MIPREG
3
0.05
3.94
UNITROLP 1
MIPREG
4
0.05
3.94
UNITROLP 1
MIPREG
5
0.05
3.94
UNITROLP 1
MIPREG
6
0.05
4.41
UNITROLP 2
MIPREG
7
0.05
4.41
UNITROLP 2
MIPREG
7
0.05
4.41
UNITROLP 2
MIPREG
7
0.04
2.00
AVR3
1
TURGAZ+
1
0.04
2.00
AVR3
1
TURGAZ+
1
0.04
2.00
AVR3
1
TURGAZ+
1
0.04
2.00
AVR3
1
TURGAZ+
1
0.03
2.20
AVR3
1
TURGAZ+
1
0.03
2.20
AVR3
1
TURGAZ+
1
0.03
2.20
AVR3
1
TURGAZ+
1
0.08
2.27
AVR3
1
TURGAZ+
1
0.08
2.27
AVR3
1
TURGAZ+
1
0.08
2.27
AVR3
1
PMCONST
1
0.03
2.30
UNITROLP 3
GT13E2
1
0.03
2.30
UNITROLP 3
GT13E2
1
0.08
2.27
AVR3
1
TURGAZ+
4
0.08
2.27
AVR3
1
TURGAZ+
4
0.08
2.27
AVR3
1
PMCONST
1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
MTCOFFG1
MTCOFFG2
MTCOFFG3
MTCOFFG4
BUCHANG1
BUCHANG2
BUSHRD1G
BUSHR2G1
BUSHR2G2
BUSHR2G3
BUSHR2G4
BUSHR2G5
BUSHR2G6
BUSHR2G7
BUSHR2G8
2171AYAM
2172AYAM
2181AYAM
2182AYAM
2092BUYO
2093BUYO
2094BUYO
2042KOSS
2043KOSS
2044KOSS
2032TAAB
2033TAAB
2034TAAB
2022VGT1
2022VGT2
2023VGT1
2023VGT2
2024VRID
2025VRID
2026VRID
2027VRID
2028VRID
2029VRID
2501AZI
2502AZI
20NGTAG8
20NTAG82
20NTAG83
Noeud
Nom
2NEWCC-1
2NEWCC-2
20FAYE90
4KOS1_11
4KOS2_11
4KOS3_11
4KOS4_11
4KOS5_11
4KOS6_11
4KOSSO15
4KOSSO15
4OUA11_6
4OUA12_6
4OUA13_6
4OUAG215
4OUAG215
4OUAG215
4OUA21_5
4OUA22_5
4OUA23_5
4OUA24_5
4OUA25_5
4BOB11_5
4BOB12_5
4BOB13_5
4BOB14_5
4BOB21_5
4BOB22_5
4BOB23_5
4BOB24_5
4BOB25_5
KOMSILG1
KOMSILG2
KOMSILG3
KOMSILG4
KOMSILG5
KOMSILG6
BOB2_2G1
BOB2_2G2
4BAGRE_6
4BAGRE_6
4KOMPI_6
4KOMPI_6
Pays
Nom
CI
CI
CI
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
BU
SN
MVA
210.0
210.0
6.0
5.0
8.0
8.0
10.0
10.0
23.0
8.0
8.0
3.0
3.0
4.0
4.0
4.0
4.0
7.0
7.0
7.0
10.0
10.0
1.0
2.0
2.0
2.0
5.0
5.0
5.0
5.0
5.0
22.0
16.0
16.0
16.0
22.0
22.0
12.0
12.0
9.0
9.0
8.0
8.0
VN
kV
15.8
15.8
90.0
11.0
11.0
11.0
11.0
11.0
11.0
15.0
15.0
6.3
6.3
5.5
15.0
15.0
15.0
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
6.6
6.6
6.6
6.6
PN turb
MW
148.0
148.0
5.0
4.0
6.0
6.0
8.0
8.0
18.0
6.0
6.0
3.0
3.0
4.0
3.0
3.0
3.0
5.0
5.0
5.0
9.0
9.0
1.0
2.0
2.0
2.0
4.0
4.0
4.0
4.0
4.0
18.0
12.0
12.0
12.0
18.0
18.0
10.0
10.0
8.0
8.0
7.0
7.0
PN alt
MW
148.0
148.0
5.0
4.0
6.0
6.0
8.0
8.0
18.0
6.0
6.0
3.0
3.0
4.0
3.0
3.0
3.0
5.0
5.0
5.0
9.0
9.0
1.0
2.0
2.0
2.0
4.0
4.0
4.0
4.0
4.0
18.0
12.0
12.0
12.0
18.0
18.0
10.0
10.0
8.0
8.0
7.0
7.0
Rs
pu
0.013
0.013
0.048
0.010
0.010
0.010
0.004
0.004
0.003
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.010
0.010
0.010
0.010
Xs
pu
0.170
0.170
0.180
0.120
0.120
0.120
0.100
0.100
0.100
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.120
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.200
0.200
Xd
pu
2.530
2.530
0.882
1.350
1.700
1.700
1.992
1.992
1.596
1.284
1.284
2.250
2.250
2.250
2.250
2.250
2.250
1.800
1.800
1.800
2.250
2.250
1.300
1.230
1.230
1.230
1.371
1.371
1.371
1.371
1.371
1.596
1.596
1.596
1.596
1.596
1.596
1.596
1.596
1.090
1.090
1.000
1.000
X'd
pu
0.250
0.250
0.320
0.209
0.260
0.260
0.274
0.274
0.266
0.220
0.220
0.300
0.300
0.300
0.350
0.350
0.350
0.380
0.380
0.380
0.375
0.375
0.200
0.200
0.200
0.200
0.220
0.220
0.220
0.220
0.220
0.266
0.266
0.266
0.266
0.266
0.266
0.266
0.266
0.286
0.286
0.350
0.350
160/167
X''d
pu
0.190
0.190
0.270
0.135
0.181
0.181
0.175
0.175
0.156
0.150
0.150
0.130
0.130
0.130
0.150
0.150
0.150
0.250
0.250
0.250
0.283
0.283
0.150
0.150
0.150
0.150
0.140
0.140
0.140
0.140
0.140
0.156
0.156
0.156
0.156
0.156
0.156
0.156
0.156
0.206
0.206
0.220
0.220
Xq
pu
0.013
0.013
0.048
0.010
0.010
0.010
0.004
0.004
0.003
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.010
0.010
0.010
0.010
X'q
pu
2.360
2.360
0.600
0.670
0.850
0.850
0.961
0.961
0.794
0.681
0.681
0.680
0.680
0.680
0.600
0.600
0.600
1.070
1.070
1.070
0.550
0.550
0.670
0.670
0.670
0.670
0.680
0.680
0.680
0.680
0.680
0.794
0.794
0.794
0.794
0.794
0.794
0.794
0.794
0.630
0.636
0.660
0.660
T''qo
H
s MW.s/MVA
0.03
2.30
0.03
2.30
0.05
2.80
0.06
5.08
0.06
5.08
0.06
5.08
0.13
5.08
0.13
5.08
0.14
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.06
5.08
0.14
5.08
0.14
5.08
0.14
5.08
0.14
5.08
0.14
5.08
0.14
5.08
0.14
5.08
0.14
5.08
0.06
2.83
0.06
2.83
0.07
3.28
0.07
3.28
AVR
AVR3
AVR3
EXST1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
IEEET1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
2NEWCC-1
2NEWCC-2
FAYE_H_G
4KOS1_11
4KOS2_11
4KOS3_11
4KOS4_11
4KOS5_11
4KOS6_11
4KOS1_15
4KOS2_15
4OUA11_6
4OUA12_6
4OUA13_6
4OU1_215
4OU2_215
4OU3_215
4OUA21_5
4OUA22_5
4OUA23_5
4OUA24_5
4OUA25_5
4BOB11_5
4BOB12_5
4BOB13_5
4BOB14_5
4BOB21_5
4BOB22_5
4BOB23_5
4BOB24_5
4BOB25_5
KOMSILG1
KOMSILG2
KOMSILG3
KOMSILG4
KOMSILG5
KOMSILG6
BOB2_2G1
BOB2_2G2
4BAGRE16
4BAGRE26
4KOMPI16
4KOMPI26
Noeud
Nom
OUAGAE08
1011AKOS
1012AKOS
1013AKOS
1014AKOS
1015AKOS
1016AKOS
1501G1
1502G2
1503G3
1191KPON
1192KPON
1193KPON
1194KPON
1321ABOA
1322ABOA
1323ABOA
1324ABOA
1325ABOA
1326ABOA
1471TT1P
1472TT1P
1473TT1P
1758G
1757G
1601OPB1602OPB1040TGEN
1040TGEN
1040TGEN
1040TGEN
1040TGEN
1040TEMA
1040TEMA
1040TEMA
1701ASO1
1701ASO2
1701ASO3
1701ASO4
1701ASO5
1701ASO6
ABOA3CC1
SASO2CC1
Pays
Nom
BU
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
GH
SN
MVA
25.0
180.0
180.0
180.0
180.0
180.0
180.0
148.0
148.0
148.0
44.0
44.0
44.0
44.0
138.0
138.0
138.0
138.0
138.0
138.0
138.0
138.0
138.0
138.0
138.0
78.0
78.0
10.0
10.0
10.0
16.0
16.0
56.0
25.0
19.0
44.0
44.0
44.0
44.0
44.0
44.0
175.0
225.0
VN
kV
90.0
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
11.0
11.0
11.0
11.0
11.0
161.0
161.0
161.0
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
PN turb
MW
20.0
150.0
150.0
150.0
150.0
150.0
150.0
133.0
133.0
133.0
35.0
35.0
35.0
35.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
62.0
62.0
8.0
8.0
8.0
13.0
13.0
45.0
20.0
15.0
35.0
35.0
35.0
35.0
35.0
35.0
140.0
180.0
PN alt
MW
20.0
170.0
170.0
170.0
170.0
170.0
170.0
133.0
133.0
133.0
40.0
40.0
40.0
40.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
110.0
62.0
62.0
8.0
8.0
8.0
13.0
13.0
45.0
20.0
15.0
35.0
35.0
35.0
35.0
35.0
35.0
140.0
180.0
Rs
pu
0.004
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.048
0.048
0.048
0.048
0.005
0.005
0.005
0.005
0.005
0.005
0.003
0.003
0.005
0.005
0.005
0.003
0.003
0.004
0.004
0.004
0.006
0.006
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.003
0.003
Xs
pu
0.180
0.145
0.145
0.145
0.145
0.145
0.145
0.145
0.145
0.145
0.180
0.180
0.180
0.180
0.178
0.178
0.183
0.178
0.178
0.183
0.130
0.130
0.183
0.178
0.178
0.130
0.130
0.079
0.079
0.079
0.124
0.124
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.130
0.130
Xd
pu
2.300
1.260
1.260
1.260
1.260
1.260
1.260
1.260
1.260
1.260
0.882
0.882
0.882
0.882
2.426
2.426
2.488
2.426
2.426
2.488
1.980
1.980
2.488
2.426
2.426
1.980
1.980
2.041
2.041
2.041
2.318
2.318
2.510
2.510
2.510
2.510
2.510
2.510
2.510
2.510
2.510
1.980
1.980
X'd
pu
0.300
0.310
0.310
0.310
0.310
0.310
0.310
0.310
0.310
0.310
0.320
0.320
0.320
0.320
0.327
0.327
0.335
0.327
0.327
0.335
0.251
0.251
0.335
0.327
0.327
0.251
0.251
0.256
0.256
0.256
0.348
0.348
0.308
0.308
0.308
0.308
0.308
0.308
0.308
0.308
0.308
0.251
0.251
161/167
X''d
pu
0.220
0.210
0.210
0.210
0.210
0.210
0.210
0.210
0.210
0.210
0.270
0.270
0.270
0.270
0.214
0.214
0.220
0.214
0.214
0.220
0.145
0.145
0.220
0.214
0.214
0.145
0.145
0.171
0.171
0.171
0.244
0.244
0.217
0.217
0.217
0.217
0.217
0.217
0.217
0.217
0.217
0.145
0.145
Xq
pu
0.004
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.048
0.048
0.048
0.048
0.005
0.005
0.005
0.005
0.005
0.005
0.003
0.003
0.005
0.005
0.005
0.003
0.003
0.004
0.004
0.004
0.006
0.006
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.002
0.003
0.003
X'q
pu
2.200
0.760
0.760
0.760
0.760
0.760
0.760
0.760
0.760
0.760
0.600
0.600
0.600
0.600
2.344
2.344
2.403
2.344
2.344
2.403
1.810
1.810
2.403
2.344
2.344
1.810
1.810
1.048
1.048
1.048
1.186
1.186
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.300
1.810
1.810
X''q
pu
0.250
---------------------------------------0.412
0.412
0.419
0.412
0.412
0.419
0.359
0.359
0.419
0.412
0.412
0.359
0.359
---------------0.370
0.370
0.370
0.370
0.370
0.370
0.370
0.370
0.370
0.359
0.359
T'do
s
8.00
6.64
6.64
6.64
6.64
6.64
6.64
6.64
6.64
6.64
4.50
4.50
4.50
4.50
7.64
7.64
7.64
7.64
7.64
7.64
1.31
1.31
7.64
7.64
7.64
1.31
1.31
5.21
5.21
5.21
5.58
5.58
8.20
8.20
8.20
8.20
8.20
8.20
8.20
8.20
8.20
1.31
1.31
T''do
s
0.02
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.02
0.02
0.02
0.02
0.02
0.02
0.04
0.04
0.02
0.02
0.02
0.04
0.04
0.07
0.07
0.07
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.04
0.04
T'qo
s
0.50
---------------------------------------0.60
0.60
0.60
0.60
0.60
0.60
0.64
0.64
0.60
0.60
0.60
0.64
0.64
---------------1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.64
0.64
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
4
0.10
2.97
EXPIC1
1
PIDGOV
3
0.10
2.97
EXPIC1
1
PIDGOV
3
0.10
2.97
EXPIC1
1
PIDGOV
3
0.05
2.80
EXST1
1
PIDGOV
2
0.05
2.80
EXST1
1
PIDGOV
2
0.05
2.80
EXST1
1
PIDGOV
2
0.05
2.80
EXST1
1
PIDGOV
2
0.04
7.78
ST4B
1
GAST
1
0.04
7.78
ST4B
1
GAST
1
0.04
4.84
ST4B
1
PMCONST
1
0.04
7.78
ST4B
1
GAST
1
0.04
7.78
ST4B
1
GAST
1
0.04
4.84
ST4B
1
PMCONST
1
0.04
5.00
ST4B
1
GAST
2
0.04
5.00
ST4B
1
GAST
2
0.04
4.84
ST4B
1
PMCONST
1
0.04
7.78
ST4B
1
GAST
8
0.04
7.78
ST4B
1
GAST
8
0.04
5.00
ST4B
1
GAST
2
0.04
5.00
ST4B
1
GAST
2
0.22
3.00
ST4B
1
GAST
4
0.22
3.00
ST4B
1
GAST
4
0.22
3.00
ST4B
1
GAST
4
0.14
3.00
ST4B
1
GAST
3
0.14
3.00
ST4B
1
GAST
3
0.05
3.00
ST4B
1
GAST
1
0.05
3.00
ST4B
1
GAST
1
0.05
3.00
ST4B
1
GAST
1
0.05
5.00
EXST1
1
GAST
5
0.05
5.00
EXST1
1
GAST
5
0.05
5.00
EXST1
1
PMCONST
1
0.05
5.00
EXST1
1
GAST
5
0.05
5.00
EXST1
1
GAST
5
0.05
5.00
EXST1
1
PMCONST
1
0.04
5.00
ST4B
1
GAST
2
0.04
5.00
ST4B
1
GAST
2
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
MANASEMA
AKOSOMG1
AKOSOMG2
AKOSOMG3
AKOSOMG4
AKOSOMG5
AKOSOMG6
BUI___G1
BUI___G2
BUI___G3
KPONGHG1
KPONGHG2
KPONGHG3
KPONGHG4
ABOAT1G1
ABOAT1G2
ABOAT1ST
ABOAT2G1
ABOAT2G2
ABOAT2ST
TEMAT1G1
TEMAT1G2
TEMAT1ST
DOMIT1G1
DOMIT1G2
BARGE_G1
BARGE_G2
TEMAT2G3
TEMAT2G4
TEMAT2G5
TEMAT2G1
TEMAT2G2
TEMAMRP1
TEMAMRP2
TEMAMRP3
SUNASOG1
SUNASOG2
SUNASOG3
SUNASOG4
SUNASOG5
SUNASOG6
ABOA3CC1
SASO2CC1
Noeud
Nom
SASO2CC2
3061NANG
3062NANG
3NGLOG12
3NEWIPP
CONTOU1G
CONTOU1G
CONTOU1G
CONTOU1G
CONTOU1G
CONTOU1G
AKPAKP1G
NATITI1G
PORTON1G
PARAKO1G
LOME__1G
KARA__1G
KARA__1G
CAI___1G
CAI___2G
CAI___3G
CAI___4G
CAI___5G
CAI___6G
CAI___7G
CAI___8G
IPPTHE1G
MA_GLE1G
MA_GLE2G
MA_GLE3G
GOUDELG1
GOUDELG2
GOUDELG3
GOUDELG4
NIAM21_D
NIAM21_D
NIAM21_D
SALKAD_G
ZINDER06
SONIC1_D
SONIC2_D
SONIC3_D
SONIC4_D
Pays
Nom
GH
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SN
MVA
225.0
36.0
36.0
25.0
25.0
21.0
21.0
21.0
21.0
21.0
21.0
38.0
15.0
15.0
32.0
20.0
20.0
5.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
125.0
188.0
188.0
188.0
8.0
8.0
8.0
8.0
12.0
12.0
12.0
75.0
75.0
20.0
20.0
20.0
20.0
VN
kV
13.8
10.3
10.3
11.0
11.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
10.5
132.0
20.0
20.0
20.0
20.0
PN turb
MW
180.0
33.0
33.0
20.0
20.0
17.0
17.0
17.0
17.0
17.0
17.0
30.0
12.0
12.0
25.0
16.0
16.0
4.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
100.0
150.0
150.0
150.0
6.0
6.0
6.0
6.0
10.0
10.0
10.0
60.0
60.0
16.0
16.0
16.0
16.0
PN alt
MW
180.0
33.0
33.0
20.0
20.0
17.0
17.0
17.0
17.0
17.0
17.0
30.0
12.0
12.0
25.0
16.0
16.0
4.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
100.0
150.0
150.0
150.0
6.0
6.0
6.0
6.0
10.0
10.0
10.0
60.0
60.0
16.0
16.0
16.0
16.0
Rs
pu
0.003
0.011
0.011
0.006
0.006
0.004
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.005
0.005
0.005
0.005
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
Xs
pu
0.130
0.167
0.167
0.100
0.100
0.180
0.180
0.180
0.180
0.180
0.180
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.106
0.106
0.106
0.140
0.140
0.140
0.140
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
0.180
Xd
pu
1.980
0.994
0.994
0.994
0.994
2.300
2.300
2.300
2.300
2.300
2.300
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.170
2.170
2.170
2.000
2.000
2.000
2.000
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.300
2.300
X'd
pu
0.251
0.268
0.268
0.294
0.294
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.210
0.210
0.210
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300
162/167
X''d
pu
0.145
0.185
0.185
0.210
0.210
0.220
0.220
0.220
0.220
0.220
0.220
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.133
0.133
0.133
0.200
0.200
0.200
0.200
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.220
Xq
pu
0.003
0.011
0.011
0.006
0.006
0.004
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.005
0.005
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.005
0.005
0.005
0.005
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
X'q
pu
1.810
0.767
0.767
0.700
0.700
2.200
2.200
2.200
2.200
2.200
2.200
1.900
1.900
1.900
1.900
1.900
1.900
1.900
2.200
2.200
2.200
2.200
2.200
2.200
2.200
2.200
2.200
1.953
1.953
1.953
1.900
1.900
1.900
1.900
2.200
2.200
2.200
2.200
2.200
2.200
2.200
2.200
2.200
X''q
pu
0.359
------0.400
0.400
0.250
0.250
0.250
0.250
0.250
0.250
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.210
0.210
0.210
0.275
0.275
0.275
0.275
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
T'do
s
1.31
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
6.20
6.20
6.20
6.20
6.20
6.20
6.20
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
5.00
5.00
5.00
6.20
6.20
6.20
6.20
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
T''do
s
0.04
0.04
0.04
0.05
0.05
0.02
0.02
0.02
0.02
0.02
0.02
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.05
0.05
0.05
0.03
0.03
0.03
0.03
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
T'qo
s
0.64
------0.71
0.71
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.04
5.00
ST4B
1
GAST
2
0.04
2.80
EXST1
2
HYGOV
2
0.04
2.80
EXST1
2
HYGOV
2
0.04
3.00
IEEET2
1
GAST
6
0.04
3.00
IEEET2
1
GAST
6
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.03
2.00
AC1IEEE+
1
DIESEL
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
GAST
2
0.05
4.00
ST1IEEE
1
GAST
2
0.05
4.00
ST1IEEE
1
PMCONST
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.03
2.00
AC1IEEE+
1
DIESEL
1
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.01
2.00
AC1IEEE+
1
CCGOV
1
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
SASO2CC2
3061NANG
3062NANG
3NGLOG12
3NEWIPP
CONTOU1G
CONTOU2G
CONTOU3G
CONTOU4G
CONTOU5G
CONTOU6G
AKPAKP1G
NATITI1G
PORTON1G
PARAKO1G
LOME__1G
CEETKARA
SOKODE1G
CAI___1G
CAI___2G
CAI___3G
CAI___4G
CAI___5G
CAI___6G
CAI___7G
CAI___8G
IPPTHE1G
MA_GLE1G
MA_GLE2G
MA_GLE3G
GOUDELG1
GOUDELG2
GOUDELG3
GOUDELG4
TAG1_NY2
TAG2_NY2
TAG3_NY2
SALKADAG
ZINDCC1G
SONIC1_G
SONIC2_G
SONIC3_G
SONIC4_G
Noeud
Nom
NIAM2_06
AFAMGT13
AFAMGT14
AFAMGT15
AFAMGT16
AFAMGT17
AFAMGT18
AFAMGT19
AFAMGT20
DELTAG03
DELTAG04
DELTAG05
DELTAG06
DELTAG07
DELTAG08
DELTAG09
DELTAG10
DELTAG11
DELTAG12
DELTAG13
DELTAG14
DELTAG15
DELTAG16
DELTAG17
DELTAG18
DELTAG19
DELTAG20
EGBINST1
EGBINST2
EGBINST3
EGBINST4
EGBINST5
EGBINST6
EGBINGT1
EGBINGT2
EGBINGT3
EGBINGT4
EGBINGT5
EGBINGT6
EGBINGT7
EGBINGT8
EGBINGT9
JEBBGH1
Pays
Nom
NR
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
SN
MVA
75.0
110.0
110.0
110.0
110.0
110.0
110.0
163.0
163.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
134.0
134.0
134.0
134.0
134.0
134.0
246.0
246.0
246.0
246.0
246.0
246.0
39.0
39.0
39.0
40.0
40.0
40.0
40.0
40.0
40.0
119.0
VN
kV
132.0
10.5
10.5
11.5
11.5
11.5
11.5
15.8
15.8
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
16.0
16.0
16.0
16.0
16.0
16.0
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
16.0
PN turb
MW
50.0
88.0
88.0
88.0
88.0
88.0
88.0
138.0
138.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
114.0
114.0
114.0
114.0
114.0
114.0
221.0
221.0
221.0
221.0
221.0
221.0
31.0
31.0
31.0
32.0
32.0
32.0
36.0
36.0
36.0
101.0
PN alt
MW
50.0
88.0
88.0
88.0
88.0
88.0
88.0
138.0
138.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
24.0
114.0
114.0
114.0
114.0
114.0
114.0
221.0
221.0
221.0
221.0
221.0
221.0
31.0
31.0
31.0
32.0
32.0
32.0
36.0
36.0
36.0
101.0
Rs
pu
0.004
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
Xs
pu
0.180
0.088
0.088
0.081
0.081
0.081
0.081
0.175
0.175
0.100
0.100
0.100
0.100
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.181
0.181
0.181
0.181
0.181
0.181
0.200
0.200
0.200
0.200
0.200
0.200
0.175
0.175
0.175
0.175
0.175
0.175
0.175
0.175
0.175
0.230
Xd
pu
2.300
2.170
2.170
2.370
2.370
2.370
2.370
2.750
2.750
1.800
1.800
1.800
1.800
1.440
1.440
1.440
1.440
1.440
1.440
1.440
1.440
1.905
1.905
1.905
1.905
1.905
1.905
2.000
2.000
2.000
2.000
2.000
2.000
2.750
2.750
2.750
2.750
2.750
2.750
2.750
2.750
2.750
0.650
X'd
pu
0.300
0.210
0.210
0.210
0.210
0.210
0.210
0.275
0.275
0.210
0.210
0.210
0.210
0.168
0.168
0.168
0.168
0.168
0.168
0.168
0.168
0.319
0.319
0.319
0.319
0.319
0.319
0.310
0.310
0.310
0.310
0.310
0.310
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.275
0.480
163/167
X''d
pu
0.220
0.154
0.154
0.137
0.137
0.137
0.137
0.200
0.200
0.150
0.150
0.150
0.150
0.129
0.129
0.129
0.129
0.129
0.129
0.129
0.129
0.226
0.226
0.226
0.226
0.226
0.226
0.280
0.280
0.280
0.280
0.280
0.280
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.240
Xq
pu
0.004
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
X'q
pu
2.200
1.953
1.953
1.953
1.953
1.953
1.953
2.230
2.230
1.370
1.370
1.370
1.370
1.370
1.370
1.370
1.370
1.370
1.370
1.370
1.370
1.835
1.835
1.835
1.835
1.835
1.835
2.000
2.000
2.000
2.000
2.000
2.000
2.200
2.200
2.200
2.200
2.200
2.200
2.200
2.200
2.200
0.440
X''q
pu
0.250
0.210
0.210
0.210
0.210
0.210
0.210
0.210
0.210
------------------------------------0.542
0.542
0.542
0.542
0.542
0.542
0.500
0.500
0.500
0.500
0.500
0.500
0.420
0.420
0.420
0.420
0.420
0.420
0.420
0.420
0.420
----
T'do
s
8.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.46
5.46
5.46
5.46
5.46
5.46
5.46
5.46
5.46
5.46
5.46
5.46
3.71
3.71
3.71
3.71
3.71
3.71
7.10
7.10
7.10
7.10
7.10
7.10
9.50
9.50
9.50
9.50
9.50
9.50
9.50
9.50
9.50
5.20
T''do
s
0.02
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.06
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.03
0.03
0.03
0.03
0.03
0.03
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.05
T'qo
s
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
------------------------------------0.35
0.35
0.35
0.35
0.35
0.35
1.00
1.00
1.00
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
----
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.01
2.00
AC1IEEE+
1
GOVCLAS
1
0.05
6.00
ST1IEEE
1
TURGAZ+
3
0.05
6.00
ST1IEEE
1
TURGAZ+
3
0.05
6.00
ST1IEEE
1
TURGAZ+
3
0.05
6.00
ST1IEEE
1
TURGAZ+
3
0.05
6.00
ST1IEEE
1
TURGAZ+
3
0.05
6.00
ST1IEEE
1
TURGAZ+
3
0.49
6.00
ST1IEEE
1
TURGAZ+
3
0.49
6.00
ST1IEEE
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.49
6.45
AC1IEEE+
1
TURGAZ+
3
0.08
9.60
AC1IEEE+
1
TURGAZ+
3
0.08
9.60
AC1IEEE+
1
TURGAZ+
3
0.08
9.60
AC1IEEE+
1
TURGAZ+
3
0.08
9.60
AC1IEEE+
1
TURGAZ+
3
0.08
9.60
AC1IEEE+
1
TURGAZ+
3
0.08
9.60
AC1IEEE+
1
TURGAZ+
3
0.11
6.50
ST1IEEE
1
GOVCLAS
1
0.11
6.50
ST1IEEE
1
GOVCLAS
1
0.11
6.50
ST1IEEE
1
GOVCLAS
1
0.11
6.50
ST1IEEE
1
GOVCLAS
1
0.11
6.50
ST1IEEE
1
GOVCLAS
1
0.11
6.50
ST1IEEE
1
GOVCLAS
1
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.49
3.10
ST1IEEE
1
TURGAZ+
3
0.10
3.25
AC1IEEE+
1
GOVHYDR
3
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
NIGERSOL
AFAMGT13
AFAMGT14
AFAMGT15
AFAMGT16
AFAMGT17
AFAMGT18
AFAMGT19
AFAMGT20
DELTAG03
DELTAG04
DELTAG05
DELTAG06
DELTAG07
DELTAG08
DELTAG09
DELTAG10
DELTAG11
DELTAG12
DELTAG13
DELTAG14
DELTAG15
DELTAG16
DELTAG17
DELTAG18
DELTAG19
DELTAG20
EGBINST1
EGBINST2
EGBINST3
EGBINST4
EGBINST5
EGBINST6
EGBINGT1
EGBINGT2
EGBINGT3
EGBINGT4
EGBINGT5
EGBINGT6
EGBINGT7
EGBINGT8
EGBINGT9
JEBBGH1
Noeud
Nom
JEBBGH2
JEBBGH3
JEBBGH4
JEBBGH5
JEBBGH6
KAING05
KAING06
KAING07
KAING08
KAING09
KAING10
KAING11
KAING12
SHIRGH1
SHIRGH2
SHIRGH3
SHIRGH4
KWALCC1
KWALCC2
KWALCC3
SAPELST1
SAPELST2
SAPELST3
SAPELST4
SAPELST5
SAPELST6
AFAM6GT1
AFAM6GT2
AFAM6GT3
AFAM6GT4
AFAM6GT5
PAPAGT12
PAPAGT12
PAPAGT34
PAPAGT34
PAPAGT56
PAPAGT56
PAPAGT78
PAPAGT78
PAPA2GT1
PAPA2GT2
PAPA2GT3
PAPA2GT4
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
SN
MVA
119.0
119.0
119.0
119.0
119.0
126.0
126.0
85.0
85.0
85.0
85.0
115.0
115.0
176.0
176.0
176.0
176.0
210.0
210.0
210.0
134.0
134.0
134.0
134.0
134.0
134.0
188.0
188.0
188.0
188.0
188.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
158.0
158.0
158.0
158.0
VN
kV
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
15.6
15.6
15.6
15.6
15.8
15.8
15.8
15.8
15.8
15.8
15.8
15.8
15.8
15.0
15.0
15.0
15.0
15.0
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
15.0
15.0
15.0
15.0
PN turb
MW
101.0
101.0
101.0
101.0
101.0
120.0
120.0
81.0
81.0
81.0
81.0
109.0
109.0
150.0
150.0
150.0
150.0
178.0
178.0
178.0
121.0
121.0
121.0
121.0
121.0
121.0
150.0
150.0
150.0
150.0
150.0
38.0
38.0
38.0
38.0
38.0
38.0
38.0
38.0
126.0
126.0
126.0
126.0
PN alt
MW
101.0
101.0
101.0
101.0
101.0
120.0
120.0
81.0
81.0
81.0
81.0
109.0
109.0
150.0
150.0
150.0
150.0
178.0
178.0
178.0
121.0
121.0
121.0
121.0
121.0
121.0
150.0
150.0
150.0
150.0
150.0
38.0
38.0
38.0
38.0
38.0
38.0
38.0
38.0
126.0
126.0
126.0
126.0
Rs
pu
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.003
0.003
0.003
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.000
0.000
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.000
Xs
pu
0.230
0.230
0.230
0.230
0.230
0.150
0.150
0.100
0.100
0.100
0.100
0.130
0.130
0.150
0.150
0.150
0.150
0.170
0.170
0.170
0.130
0.130
0.130
0.130
0.130
0.130
0.106
0.106
0.106
0.106
0.106
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.010
0.106
0.106
0.106
0.106
Xd
pu
0.650
0.650
0.650
0.650
0.650
0.850
0.850
0.760
0.760
0.760
0.760
0.780
0.780
0.800
0.800
0.800
0.800
2.530
2.530
2.530
2.400
2.400
2.400
2.400
2.400
2.400
2.170
2.170
2.170
2.170
2.170
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.170
2.170
2.170
2.170
X'd
pu
0.480
0.480
0.480
0.480
0.480
0.300
0.300
0.248
0.248
0.248
0.248
0.260
0.260
0.300
0.300
0.300
0.300
0.250
0.250
0.250
0.215
0.215
0.215
0.215
0.215
0.215
0.210
0.210
0.210
0.210
0.210
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.220
0.210
0.210
0.210
0.210
164/167
X''d
pu
0.240
0.240
0.240
0.240
0.240
0.240
0.240
0.200
0.200
0.200
0.200
0.220
0.220
0.200
0.200
0.200
0.200
0.190
0.190
0.190
0.160
0.160
0.160
0.160
0.160
0.160
0.133
0.133
0.133
0.133
0.133
0.148
0.148
0.148
0.148
0.148
0.148
0.148
0.148
0.133
0.133
0.133
0.133
Xq
pu
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.003
0.003
0.003
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.000
0.000
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.000
X'q
pu
0.440
0.440
0.440
0.440
0.440
0.550
0.550
0.430
0.430
0.430
0.430
0.440
0.440
0.490
0.490
0.490
0.490
2.360
2.360
2.360
2.160
2.160
2.160
2.160
2.160
2.160
1.953
1.953
1.953
1.953
1.953
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
1.953
1.953
1.953
1.953
X''q
pu
---------------------------------------------------0.400
0.400
0.400
------------------0.210
0.210
0.210
0.210
0.210
------------------------0.210
0.210
0.210
0.210
T'do
s
5.20
5.20
5.20
5.20
5.20
5.60
5.60
6.06
6.06
6.06
6.06
6.50
6.50
5.57
5.57
5.57
5.57
10.12
10.12
10.12
8.61
8.61
8.61
8.61
8.61
8.61
5.00
5.00
5.00
5.00
5.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.00
5.00
5.00
5.00
T''do
s
0.05
0.05
0.05
0.05
0.05
0.02
0.02
0.04
0.04
0.04
0.04
0.02
0.02
0.02
0.02
0.02
0.02
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.05
0.05
0.05
0.05
T'qo
s
---------------------------------------------------0.93
0.93
0.93
------------------1.00
1.00
1.00
1.00
1.00
------------------------1.00
1.00
1.00
1.00
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.10
3.25
AC1IEEE+
1
GOVHYDR
3
0.10
3.25
AC1IEEE+
1
GOVHYDR
3
0.10
3.25
AC1IEEE+
1
GOVHYDR
3
0.10
3.25
AC1IEEE+
1
GOVHYDR
3
0.10
3.25
AC1IEEE+
1
GOVHYDR
3
0.08
3.25
AC1IEEE+
1
GOVHYDR
1
0.08
3.25
AC1IEEE+
1
GOVHYDR
1
0.13
3.23
AC1IEEE+
1
GOVHYDR
2
0.13
3.23
AC1IEEE+
1
GOVHYDR
2
0.13
3.23
AC1IEEE+
1
GOVHYDR
2
0.13
3.23
AC1IEEE+
1
GOVHYDR
2
0.07
3.45
AC1IEEE+
1
GOVHYDR
2
0.07
3.45
AC1IEEE+
1
GOVHYDR
2
0.08
3.24
AC1IEEE+
1
GOVHYDR
4
0.08
3.24
AC1IEEE+
1
GOVHYDR
4
0.08
3.24
AC1IEEE+
1
GOVHYDR
4
0.08
3.24
AC1IEEE+
1
GOVHYDR
4
0.03
3.10
AC1IEEE+
1
GAST
2
0.03
3.10
AC1IEEE+
1
GAST
2
0.03
3.10
AC1IEEE+
1
PMCONST
1
0.10
1.18
AC1IEEE+
1
GOVCLAS
1
0.10
1.18
AC1IEEE+
1
GOVCLAS
1
0.10
1.18
AC1IEEE+
1
GOVCLAS
1
0.10
1.18
AC1IEEE+
1
GOVCLAS
1
0.10
1.18
AC1IEEE+
1
GOVCLAS
1
0.10
1.18
AC1IEEE+
1
GOVCLAS
1
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.01
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
JEBBGH2
JEBBGH3
JEBBGH4
JEBBGH5
JEBBGH6
KAING05
KAING06
KAING07
KAING08
KAING09
KAING10
KAING11
KAING12
SHIRGH1
SHIRGH2
SHIRGH3
SHIRGH4
KWALCC1
KWALCC2
KWALCC3
SAPELST1
SAPELST2
SAPELST3
SAPELST4
SAPELST5
SAPELST6
AFAM6GT1
AFAM6GT2
AFAM6GT3
AFAM6GT4
AFAM6GT5
PAPA1GT1
PAPA1GT2
PAPA1GT3
PAPA1GT4
PAPA1GT5
PAPA1GT6
PAPA1GT7
PAPA1GT8
PAPA2GT1
PAPA2GT2
PAPA2GT3
PAPA2GT4
Noeud
Nom
OMOTGT12
OMOTGT12
OMOTGT34
OMOTGT34
OMOTGT56
OMOTGT56
OMOTGT78
OMOTGT78
OMOT2GT1
OMOT2GT2
OMOT2GT3
OMOT2GT4
GEREGGT1
GEREGGT2
GEREGGT3
GEREGGT4
GEREGGT5
GEREGGT6
ALAOJGT1
ALAOJGT2
ALAOJGT3
ALAOJGT4
CALABGT1
CALABGT2
CALABGT3
CALABGT4
CALABGT5
EGBEMGT1
EGBEMGT2
EGBEMGT3
EYAENGT1
EYAENGT2
EYAENGT3
EYAENGT4
GBARAGT1
GBARAGT2
IKOTAGT1
IKOTAGT2
IKOTAGT3
SAPELGT1
SAPELGT2
SAPELGT3
SAPELGT4
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
SN
MVA
48.0
48.0
48.0
48.0
48.0
48.0
48.0
48.0
158.0
158.0
158.0
158.0
174.0
174.0
174.0
174.0
174.0
174.0
141.0
141.0
141.0
158.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
141.0
VN
kV
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
15.0
15.0
15.0
15.0
15.8
15.8
15.8
15.8
15.8
15.8
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
PN turb
MW
38.0
38.0
38.0
38.0
38.0
38.0
38.0
38.0
126.0
126.0
126.0
126.0
148.0
148.0
148.0
148.0
148.0
148.0
120.0
120.0
113.0
126.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
PN alt
MW
38.0
38.0
38.0
38.0
38.0
38.0
38.0
38.0
126.0
126.0
126.0
126.0
148.0
148.0
148.0
148.0
148.0
148.0
120.0
120.0
113.0
126.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
Rs
pu
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Xs
pu
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.140
0.106
0.106
0.106
0.106
0.106
0.106
0.106
0.106
0.106
0.106
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
Xd
pu
2.380
2.380
2.380
2.380
2.380
2.380
2.380
2.380
2.170
2.170
2.170
2.170
1.918
1.918
1.918
2.170
2.170
2.170
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
X'd
pu
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.210
0.210
0.210
0.210
0.184
0.184
0.184
0.210
0.210
0.210
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
165/167
X''d
pu
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.133
0.133
0.133
0.133
0.121
0.121
0.121
0.133
0.133
0.133
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
Xq
pu
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
X'q
pu
2.380
2.380
2.380
2.380
2.380
2.380
2.380
2.380
1.953
1.953
1.953
1.953
1.918
1.918
1.918
1.953
1.953
1.953
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
X''q
pu
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.210
0.210
0.210
0.210
0.330
0.330
0.330
0.210
0.210
0.210
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
T'do
s
10.20
10.20
10.20
10.20
10.20
10.20
10.20
10.20
5.00
5.00
5.00
5.00
10.00
10.00
10.00
5.00
5.00
5.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
T''do
s
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
T'qo
s
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
AC1IEEE+
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
4.00
ST1IEEE
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
OMOT1GT1
OMOT1GT2
OMOT1GT3
OMOT1GT4
OMOT1GT5
OMOT1GT6
OMOT1GT7
OMOT1GT8
OMOT2GT1
OMOT2GT2
OMOT2GT3
OMOT2GT4
GEREGGT1
GEREGGT2
GEREGGT3
GEREGGT4
GEREGGT5
GEREGGT6
ALAOJGT1
ALAOJGT2
ALAOJGT3
ALAOJGT4
CALABGT1
CALABGT2
CALABGT3
CALABGT4
CALABGT5
EGBEMGT1
EGBEMGT2
EGBEMGT3
EYAENGT1
EYAENGT2
EYAENGT3
EYAENGT4
GBARAGT1
GBARAGT2
IKOTAGT1
IKOTAGT2
IKOTAGT3
SAPELGT1
SAPELGT2
SAPELGT3
SAPELGT4
Noeud
Nom
OMOKUGT1
OMOKUGT2
OMOKURG1
OMOKURG2
ALSCOGT1
ALSCOGT2
ALSCOGT3
ALSCOGT4
ALSCOGT5
ALSCOGT6
IBOMGT01
IBOMGT02
IBOMGT03
ICSPOWG1
ICSPOWG2
ICSPOWG3
ICSPOWG4
ICSPOWG5
ICSPOWG6
BONMOBG1
BONMOBG2
BONMOBG3
CHEVROG1
CHEVROG2
CHEVROG3
TOTALFG4
TOTALFG3
TOTALFG2
TOTALFG1
WESTCOG4
WESTCOG3
WESTCOG2
WESTCOG1
IBOMP2G1
IBOMP2G2
IBOMP2G3
IBOMP2G4
FARMELEG
ALAOCCG1
ALAOCCG2
Pays
Nom
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
NI
SN
MVA
141.0
141.0
62.0
62.0
112.0
112.0
112.0
112.0
112.0
112.0
48.0
48.0
140.0
125.0
125.0
125.0
125.0
125.0
125.0
162.0
162.0
162.0
312.0
312.0
312.0
156.0
156.0
156.0
156.0
156.0
156.0
156.0
156.0
156.0
156.0
156.0
156.0
188.0
335.0
335.0
VN
kV
15.0
15.0
11.5
11.5
15.0
15.0
15.0
15.0
15.0
15.0
11.5
11.5
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
16.0
16.0
16.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
17.0
17.0
PN turb
MW
113.0
113.0
50.0
50.0
90.0
90.0
90.0
90.0
90.0
90.0
38.0
38.0
112.0
100.0
100.0
100.0
100.0
100.0
100.0
130.0
130.0
130.0
250.0
250.0
250.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
150.0
285.0
285.0
PN alt
MW
113.0
113.0
50.0
50.0
90.0
90.0
90.0
90.0
90.0
90.0
38.0
38.0
112.0
100.0
100.0
100.0
100.0
100.0
100.0
130.0
130.0
130.0
250.0
250.0
250.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
125.0
150.0
285.0
285.0
Rs
pu
0.000
0.000
0.004
0.004
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.004
Xs
pu
0.119
0.119
0.180
0.180
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.119
0.180
0.180
Xd
pu
1.820
1.820
2.300
2.300
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.820
1.870
1.870
166/167
X'd
pu
0.231
0.231
0.300
0.300
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.231
0.262
0.262
X''d
pu
0.164
0.164
0.220
0.220
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.164
0.230
0.230
Xq
pu
0.000
0.000
0.004
0.004
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.004
X'q
pu
1.660
1.660
2.200
2.200
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.660
1.870
1.870
X''q
pu
0.330
0.330
0.250
0.250
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.330
0.450
0.450
T'do
s
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
7.10
7.10
T''do
s
0.05
0.05
0.02
0.02
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.06
T'qo
s
1.00
1.00
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
T''qo
H
AVR
DATA GOVERNOR DATA
s MW.s/MVA
SET
SET
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.01
2.00
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
2.00
AC1IEEE+
1
TURGAZ+
3
0.05
2.00
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.05
1.37
AC1IEEE+
1
TURGAZ+
3
0.11
3.09
AC1IEEE+
1
CCGOV
1
0.11
3.09
AC1IEEE+
1
CCGOV
1
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Machine
Nom
OMOKUGT1
OMOKUGT2
OMOKURG1
OMOKURG2
ALSCOGT1
ALSCOGT2
ALSCOGT3
ALSCOGT4
ALSCOGT5
ALSCOGT6
IBOMGT01
IBOMGT02
IBOMGT03
ICSPOWG1
ICSPOWG2
ICSPOWG3
ICSPOWG4
ICSPOWG5
ICSPOWG6
BONMOBG1
BONMOBG2
BONMOBG3
CHEVROG1
CHEVROG2
CHEVROG3
TOTALFG1
TOTALFG2
TOTALFG3
TOTALFG4
WESTCOG1
WESTCOG2
WESTCOG3
WESTCOG4
IBOMP2G1
IBOMP2G2
IBOMP2G3
IBOMP2G4
FARMELEG
ALAOCCG1
ALAOCCG2
9.2.
Convertisseurs
Machine
Noeud
SN
Nom
Nom
MVA
WIND__1G CAPEB11G 156
NIGEREOL NIAM2_06 36
9.3.
VN
kV
15
15
Filtre
s
0.01
0.01
SVC
SVC
Nom
KENYASVC
TAMALSVC
MONROSVC
BUMBUSVC
LINSASVC
Noeud de connexion
Nom
1414KENY
1282ATAM
MONROV03
BUMBUN03
LINSAN03
Pays
Nom
GH
GH
LI
SL
GU
Tension
kV
11
34.5
225
225
225
Q reactive minimum
Mvar (reactif)
-40
-40
-65
-32
-15
Q reactive maximum
Mvar (capacitif)
40
40
0
2
15
This document is the property of Tractebel Engineering S.A. Any duplication or transmission to third parties is forbidden without prior written approval
Dans les tudes statiques, les SVC sont modliss comme des charges. En dynamique, ils
se comportent selon la fonction de transfert du macroblock INTERSVC.
167/167
Tractebel Engineering, lune des premires socits de conseil en ingnierie lchelle europenne, fait partie de GDF SUEZ,
un groupe industriel qui dispose dune solidit financire pour relever les dfis du futur. Avec prs de 3 900 collaborateurs
prsents dans 20 pays, nous offrons des solutions dingnierie nos clients actifs dans les domaines de llectricit, du
nuclaire, du gaz, de lindustrie et des infrastructures et ce tout au long du cycle de vie des projets. Nos comptences
sexpriment au travers dun large ventail de services dingnierie : Consultance, Conception et Assistance Matrise
dOuvrage. Nos clients sont des entreprises prives et publiques ainsi que des institutions nationales et internationales.
Avenue Ariane 7
1200 Bruxelles - BelgiQUE
www.tractebel-engineering-gdfsuez.com
Yves BOUFFIOULX
tel. +32 2 773 83 79
fax +32 2 773 88 90
yves.bouffioulx@gdfsuez.com