Vous êtes sur la page 1sur 32

N°05

décembre 2019

LE JOURNAL
DU CONTRACT
MANAGEMENT
03 ÉDITOS

05 ACTUALITÉS

07 D
 OSSIER : LES DIFFÉRENTS TYPES
DE CONTRATS STANDARDISÉS 

24 ÉVÉNEMENT

26 LE COIN DES EXPERTS

31 LE COIN DES LECTEURS

32 AGENDA
À PROPOS...

LE JOURNAL DU CONTRACT MANAGEMENT


EST PUBLIÉ PAR :

Fondée en 2013, l’Association Française du Contract Management a pour mission de rassembler


les contract managers, de participer activement au développement, à la professionnalisation, à la
promotion du contract management et à l’amélioration de son positionnement dans l’entreprise.

Renseignements et adhésion : www.afcm-asso.fr

En collaboration avec l’ADUCMA :


Créée en 2015, l’Association du Diplôme Universitaire de Contract Management d’Assas (Paris II)
a pour principaux objectifs de rapprocher les entreprises d’un vivier de contract managers motivés,
de favoriser l’insertion professionnelle des étudiants, de communiquer sur le métier, de promouvoir
les événements et activités des étudiants, de maintenir un annuaire des anciens étudiants et de
construire des partenariats avec des passionnés.

Renseignements et adhésion : www.aducma.com

« Le journal du CM » • Rédacteur en chef : Rolland Terrin, Responsable Comité Editorial ADUCMA, contract manager Onet Technologies • Groupe
de travail : Coralie Bouscasse, Présidente AFCM, Directrice juridique Safran - Antoine Papegaey, ancien Président ADUCMA, Commercial Manager
Thales - Peter Rosher, Avocat, Partner, Reed Smith  - Louis Cointreau, Directeur régional France et pays francophones, Systech International - Vincent
Leclerc, Consultant Senior Project & Contract Management Horisis Conseil - Frédéric Berjot, Directeur Général, Driver Trett France - Jean-Charles
Savornin, Projects Advisor, Projectence • Édition et mise en page : La Machine à Écrire - www.lmae.fr • Photos : Gautier Marcy (p.5-6), DR.

2
ÉDITOS

UN JOURNAL VRAIMENT PARTICIPATIF !


Chers lecteurs,
Lors du colloque ADUCMA/Université Paris 2 Panthéon-Assas du 28 juin
2019, il a été proposé aux participants de voter pour les prochaines
thématiques du Journal du Contract Management : le sujet des « différents standards
de contrat » a été largement plébiscité. Il amènera beaucoup de personnes de notre
communauté à penser aux contrats de type FIDIC ou NEC ; une idée renforcée au regard
des diverses mises à jour des dernières années. Sans surprise, le présent Journal revient
effectivement sur ces standards réputés. Notre comité éditorial a toutefois souhaité aller
plus loin dans la démarche en proposant des standards moins utilisés en France (JCT,
ICHEME), des standards assez novateurs (Alliance) ainsi que des standards très spécifiques (open solar contracts).
Cette diversité de contrats vient une nouvelle fois illustrer la richesse de notre métier de Contract Manager.
A l’instar des numéros précédents, le Journal revient sur les évènements marquants du dernier semestre et propose
dans sa partie « coin des experts » des articles de fond.
Quant au JCM6, la thématique choisie devrait porter sur les indicateurs de mesure du Contract Management - KPI.
Je profite ainsi de cette annonce pour vous proposer, chers lecteurs, de participer au Journal. N’hésitez pas à
partager vos idées et articles à l’adresse suivante : journal@afcm-asso.fr.
Nous vous souhaitons une excellente lecture.

Rolland Terrin, Rédacteur en chef & Contract Manager chez Onet Technologies

Dans votre prochain numéro...


Dossier spécial " KPI : Les indicateurs de mesure du Contract Management"

Appel aux lecteurs / rédacteurs


Vous souhaitez participer au JCM ? Vous avez envie de partager vos expériences avec notre communauté ?
Faites-le nous savoir : journal@afcm-asso.fr

Vous êtes Contract Manager et vous avez des questions sur votre métier, recherchez des conseils ou une
écoute pour prendre du recul sur votre parcours ou votre pratique ?
Vous avez cumulé depuis plusieurs années de l’expérience voire développé une expertise dans un des
domaines de pratique du contract management et vous souhaitez partager votre expérience ou votre
vision du métier avec une personne en recherche d’échange ?

L’AFCM vous propose un accompagnement professionnel de mentoring par son service de mise en relation pour constituer un binôme
mentor / mentoré.

Vous souhaitez devenir mentor ou mentoré ? N’hésitez pas à candidater ou poser vos questions à mentoring@afcm-asso.fr 

3
ÉDITOS

TRANSMETTRE L'HÉRITAGE DE NOTRE ASSOCIATION


Je remercie l’ensemble des adhérents de l’ADUCMA qui ont élu leur nouveau
Président et son bureau lors de l’Assemblée Générale du 17 octobre 2019,
permettant ainsi à notre association de démarrer ses activités pour la saison
2019 – 2020 sans interruption ! Réussir la passation d’une association et de son héritage
est un moment important pour les créateurs comme pour les repreneurs, où la confiance, la
motivation et le soutien de chacun sont les clés d’une reprise réussie. Avec Cyrille Moinatton
(Promo 5), Président, Thomas Deveix (Promo 3), Vice-Président, Cécile Mauduit (Promo
5), Secrétaire, Anne-Flavie Cadet (Promo 5), Trésorière, Rolland Terrin (Promo 2), qui reste
Responsable du Comité Editorial, et l’accompagnement des anciens, l’ADUCMA a, nous
en sommes convaincus, toute l’énergie et la fraîcheur pour bâtir de nouveaux beaux projets. Un grand merci à ces
bénévoles qui font vivre et grandir le contract management.”

Antoine Papegaey, ancien Président de l’ADUCMA, Administrateur de l’AFCM

DE BEAUX PROJETS POUR LE NOUVEAU BUREAU DE L'ADUCMA


Chers adhérents,
Le nouveau bureau que vous venez d’élire, dont j’ai l’honneur de prendre la
Présidence vous remercie pour votre confiance.

L’ADUCMA est depuis sa création, une association dynamique et fédératrice qui a pour but de
promouvoir notre Diplôme Universitaire et la fonction du Contract Management. Antoine Papegaey
et son équipe ont entrepris de nombreuses actions pendant ces quatre dernières années. On
retiendra, entre autres, les nombreux événements organisés chaque année, les liens tissés avec
L’AFCM ou encore la mise en place de commissions notamment Événementielle, Emploi ou encore
le Comité Éditorial du "Journal du Contract Management" .

Notre mission s’inscrira naturellement, en concertation étroite avec le Directeur du Diplôme, Jérôme Chacornac, dans la droite
ligne de celle empruntée par Antoine et son équipe. En cette année de passation, nos efforts porteront essentiellement sur
l’organisation des événements annuels et sur le développement de la commission « Annuaire et Emploi ».
Nous remercions l’ensemble des membres du Bureau pour son implication au service de l’ADUCMA qui a pendant toute la durée
de son mandat apporté son énergie et son engagement à notre association et à ainsi permis d' accroître sa notoriété et son
rayonnement! Merci ! Nous vous souhaitons une bonne lecture de ce nouveau numéro du « Journal du Contract Management »
consacré aux différents standards de contrat.

Cyrille Moinatton, Président de l’ADUCMA

Remerciements aux anciens membres du Bureau de l’ADUCMA : Antoine Papegaey, ancien Président, François Blet, ancien
secrétaire, Nathalie Ferreira, ancienne secrétaire et intérim Commission rencontres & débats, Moise Noubissi, ancien responsable
Commission annuaire & emploi, et Jean-Xavier Coquet, ancien responsable Commission innovations pédagogiques. »

4
ACTUALITÉS

LE 22 NOVEMBRE 2019, UNE JOURNÉE


MARQUANTE POUR LES PARTICIPANTS
À L’ASSEMBLÉE GÉNÉRALE DE L’AFCM,
SUIVIE DE DEUX TABLES RONDES

L’ASSOCIATION FRANÇAISE DU CONTRACT MANAGEMENT Les travaux et le rayonnement de l’AFCM sont le


A TENU LE 22 NOVEMBRE 2019, SON ASSEMBLÉE fruit de l’engagement des adhérents participants
GÉNÉRALE ORDINAIRE DANS LES LOCAUX D’ENGIE, aux quatre commissions suivantes et de leurs prési-
MEMBRE FONDATEUR DE L’ASSOCIATION, À LA DÉFENSE. dents : Thierry Vidal, commission process et outils ;
Haiate Haouas, commission formation ; Audrey De-

P
leyris, commission carrière et développement profes-
our mémoire, l’Association Française du sionnel ; Valérie Gibert, commission communication.
Contract Management a été créée en 2014
et est présidée actuellement par Coralie Bous- Plus de 70 participants se sont rassemblés pour as-
casse, Directrice Juridique de SAFRAN. L’association sister à la présentation des comptes ; à la ratification
a pour trésorier Guy Vial, et est pilotée au travers de décisions de gouvernance et aux interventions
d’un bureau qui se réunit mensuellement. des différents présidents de commission pour un bilan
Comme toute association loi 1901, à but non lu- des activités passées et les feuilles de route 2020.
cratif, l’association a besoin de vous – lecteurs et Ainsi la commission Process et Outils a rapporté avoir
adhérents de l’AFCM - pour autofinancer ses diffé- pour objectif le développement de 6 questionnaires
rentes actions. de mesure de la maturité des personnes et des or-
ganisations en matière de Contract Management,
3 d’entre eux ayant déjà été réalisés, et le 1er est
destiné à déterminer si vous possédez ou non les qua-
lités utiles (ou requises) pour être Contract Manager.

La commission Formation a rappelé le succès du


1er Forum des formations en contract management
organisé en mai dernier, qui a permis de rassem-
bler 80 participants et une douzaine d’exposants ;
elle ambitionne de reproduire ce type d’événement
tous les deux ans et de réaliser un catalogue des
formations en 2020.

La commission Carrière et Développement poursuit


l’organisation régulière de « cafés-débats » sur Paris
et a initié une expérience similaire sur Lyon. Dans le
même registre un « diner-débat » a été organisé au-
tour de Alain Brunet à l’occasion de la nouvelle édi-
tion de l’ouvrage « Le Contract Management’ » (par
Franck César et Alain Brunet). Elle réinitie et poursuit
le développement de son programme de mentoring.
La commission Communication a rédigé un pitch
de l’AFCM et un organigramme de l’association,
et ambitionne de réaliser un annuaire des membres
en 2020. Les membres de cette commission utilise
différents canaux de communication pour renforcer
la visibilité de l’AFCM.

5
ACTUALITÉS


Comme toute association
à but non lucratif, l'AFCM a
besoin de vous – lecteurs et
adhérents.


Un autre livrable important et apprécié de l’AFCM
est la publication régulière du Journal du Contract Si vous souhaitez vous-mêmes tenter
Management, sous la houlette de son rédacteur en l’expérience, et savoir quel type de Contract
chef, et d’un comité de rédaction actif. Manger vous êtes (ou pourriez être) :
https://fr.surveymonkey.com/r/AFCM_
La matinée s’est poursuivie par deux moments forts : Questionnaire_1_SAVOIR_ETRE
Une table ronde sur les manières innovantes de Une fois le test achevé, un rapport détaillé
mieux communiquer sur le « Contract Management vous sera envoyé avec un lien vers le
pour convaincre » : Questionnaire 2 (« Savoirs et compétences
• Ainsi, Rayan Cherif (Horisis Conseil) nous a dé- du Contract Manager»).
voilé quelques séquences choisies d’une web série
« LE PROJECT » que son entreprise a produit. Cette
série a pour vocation de sensibiliser sur un ton hu-
moristique, voire caricatural, les facteurs clés de suc- Tous les bénévoles qui ont contribué à la réussite
cès et d’échec des projets, en insistant sur le volet de cette matinée sont vivement remerciés, et encou-
contract management. Cette série Web est propo- ragés à poursuivre leur engagement ainsi qu'à es-
sée comme un outil pédagogique intra-entreprise. saimer autour d’eux pour que le rayonnement et
• Alain Brunet et Franck César ont expliqué leur mo- l’influence de l’AFCM croisse d’année en année.
tivation à produire une nouvelle édition de leur ou-
vrage « Le Contract Management »
• Isabelle Roux-Chenu a témoigné de son expérience
dans la création de la filière contract management
au sein de Cap Gemini, en liaison directe avec la
direction générale du Groupe ; et des process qu’elle
a mis en place – tant sur le recrutement, que sur le
suivi et le développement des collaborateurs, que
sur les rôles et responsabilités des Contract Mana-
gers au sein de cette entreprise.

Et d’une présentation enthousiaste et dynamique par


les représentants de la Commission Process et Ou-
tils sur les questionnaires d’évaluation de maturité
en Contract Management qui ont été mis au point.
Le premier est en accès libre sur le site web de l’AF-
CM et permet à chacun de s’évaluer sur sa capa-
cité à être ou devenir Contract Manager ; les deux
suivants traitent d’une part, des savoirs et connais-
sances, et, d’autre part, des rôles et savoir-faire.
Cette intervention a remporté un franc succès et tout
à chacun dans la salle a pu s’essayer en ligne au
premier questionnaire.

6
AU SERVICE DES PROJETS
ET DE LEURS ACTEURS :
DIFFÉRENTS TYPES DE
CONTRATS STANDARDISÉS
Introduction par Peter Rosher
Avocat à la Cour & Solicitor (Angleterre / Pays de Galles), Associé, cabinet ReedSmith

Si les contrats FIDIC sont les modèles de contrats de construction les plus connus à
l’international, il existe une diversité de contrats standardisés, dont les caractéristiques
reflètent les spécificités des besoins des acteurs du secteur. Ces dernières années sont en
outre marquées par l’essor d’une nouvelle conception collaborative des relations entre
cocontractants. Dans ce dossier, des praticiens du droit de la construction présentent les
différentes formes standardisées de contrats et leur évolution.
Parmi celles-ci, les contrats JCT et FIDIC sont des contrats standardisés « traditionnels »
de construction. Les contrats JCT, créés dans les années 1930, sont les contrats de choix
dans le secteur privé anglais, mais ne sont quasiment pas utilisés en dehors du Royaume-Uni. A l’opposé, les contrats
FIDIC ont une vocation internationale et sont désormais la référence pour la réalisation de projets de construction à
grande échelle dans le monde entier. Les deux suites de contrats sont ponctuellement mises à jour pour répondre aux
demandes des acteurs du secteur.
Les contrats NEC ont été développés dans les années 2000 et représentent un changement de paradigme par
rapport aux contrats standardisés déjà existants. Rédigés en anglais non juridique, ils sont conçus comme des outils
de pilotage de projet plus que comme des instruments juridiques. Contrairement à l’approche adversariale favorisée
par exemple par les contrats JCT, ils mettent l’accent sur l’aspect collaboratif de la relation entre les cocontractants,
qui doit permettre de résoudre plus efficacement les éventuels différends. Les contrats NEC sont principalement utilisés
dans les pays anglo-saxons, notamment dans le secteur public, mais encore peu à l’international.
Les contrats d'alliance (contrat d'alliance projet PPC2000 et contrat d'alliance-cadre FAC 1) poussent encore plus loin
cette approche collaborative. Ils organisent les projets autour d'équipes collaboratives et intégrées, regroupant tous les
acteurs du projet, et doivent leur permettre, en alignant leurs intérêts commerciaux, de développer des connaissances
partagées, puis d'utiliser celles-ci pour améliorer les résultats du projet, voire de projets futurs. Ces contrats sont
principalement utilisés au Royaume-Uni, tant dans le secteur public que privé; ils peuvent également être adaptés à un
contexte international, et ont été utilisés notamment en Allemagne, Italie et Bulgarie.
D’autres modèles de contrats ont également émergé, en réponse à des besoins plus spécifiques. C’est le cas par
exemple des contrats IChemE, dédiés aux projets complexes d’usines de traitement : ces contrats sont axés sur la
performance et se caractérisent par une limitation importante de la responsabilité de l’entrepreneur et un régime de
tests étendus. Si la version britannique de ces contrats est bien connue outre-Manche, il est encore difficile de mesurer
l’utilisation de leur version internationale. Plus récemment, les Open Solar Contracts, créés en 2019, ont pour but la
standardisation des projets d'énergie solaire, dans l’objectif plus global d’accélérer l’accès à l’énergie solaire et d’en
réduire le coût. Bâtis autour des quatre principes de simplicité, équité, innovation et collaboration, ces contrats sont
disponibles gratuitement en ligne.

7
DOSSIER

LES CONTRATS NEC,


OUTILS DE PILOTAGE DE PROJET
NÉS DANS LES ANNÉES 1990 DE LA VOLONTÉ DES ACTEURS DE GRANDS PROJETS DE CONSTRUCTION
D’ÉVOLUER VERS DES RELATIONS CONTRACTUELLES APAISÉES ET UNE RÉDUCTION DES RÉCLAMATIONS
ET DES LITIGES DE FIN DE PROJET, LES CONTRATS NEC (NEW ENGINEERING CONTRACTS) SE SONT
IMPLANTÉS DANS LES PAYS ANGLO-SAXONS DEPUIS LES ANNÉES 2000. LEUR ADOPTION PAR LE
GOUVERNEMENT ANGLAIS POUR SES PROJETS DE TYPE MARCHÉ PUBLIC PUIS LA RÉALISATION DES
INFRASTRUCTURES DES JEUX OLYMPIQUES DE LONDRES EN 2012 ONT LARGEMENT ACCÉLÉRÉ LEUR
UTILISATION PAR LES ACTEURS BRITANNIQUES DE LA CONSTRUCTION.

S
i les contrats NEC restent essentiellement can- quences d’un non-respect de ces obligations ou en-
tonnés aux pays du Commonwealth, les entre- core les motifs de refus d’une communication. Par
prises françaises sont peu à peu confrontées exemple, si le client ne répond pas aux communi-
à cet « ovni » contractuel lorsqu’elles soumissionnent cations de l’entrepreneur dans des délais impartis,
sur certains grands projets dans ces pays. ce dernier pourra prétendre à une compensation
supplémentaire et/ou une extension des délais. De
Face à ces contrats, les opérateurs non anglo-saxons même, le client ne pourra refuser un planning qui
peuvent être quelque peu déconcertés dans la mesure lui est soumis qu’en référence aux causes de refus
où ils doivent opérer un véritable changement de pa- prévues au contrat.
radigme dans leur approche de la gestion de projet.

UNE APPROCHE PRO-ACTIVE


Dominique Auger possède UNE APPROCHE COLLABORATIVE
plus 15 ans en tant DANS L’INTÉRÊT DU PROJET Les obligations définies dans les contrats NEC visent
que Contract Manager à implémenter une approche pro-active et prospec-
et Responsable de L’esprit du NEC se résume dans la première de ses tive de la gestion du projet. Il s’agit, sur la base d’un
département contrat dans le clauses qui énonce « les différents acteurs du projet planning « contemporain »(2), de s’assurer que les
domaine de l’ingénierie et la doivent travailler en accord avec le contrat et dans un événements pouvant mettre en péril le projet soient
construction parapétrolière esprit de confiance réciproque et de coopération »(1). identifiés et traités avec un maximum d’anticipation.
à l’international. Elle est
actuellement Directrice Les contrats standard NEC matérialisent cette affir-
Adjointe de Driver Trett mation en créant une incitation à de bonnes pra-


France et est spécialisée tiques de gestion de projet et à une approche col-
dans l’analyse de risques laborative. Ils sont donc rédigés dans un anglais
contractuels, la stratégie non juridique afin d’être compréhensibles par tous
contractuelle et la les acteurs du projet et pouvoir être déclinés opéra-
négociation de contrats. tionnellement et au quotidien. Certains y verront une Ils sont rédigés
perte de la signification précise des mots employés
par rapport aux termes juridiques donc la création dans un anglais non
d’ambiguïtés potentielles, d’autres l’opportunité de
s’approprier un document souvent ignoré à cause juridique afin d’être
du vocabulaire employé.

Ces contrats intègrent le postulat selon lequel un pro-


compréhensibles par
jet n’avance efficacement que si toutes les parties
travaillent avec cet objectif. Aussi, ils s’attachent à tous les acteurs du
(r)établir un certain équilibre des obligations entre
les cocontractants et à limiter les sources de litige. projet au quotidien.


Pour cela, ils définissent des délais de notification
et de réponse à respecter par les parties, les consé-

8
DOSSIER


Ainsi, chaque partie a l’obligation de notifier son
cocontractant au fil de l’eau des problèmes suscep-
tibles d’affecter le prix, les délais ou la qualité du
projet, qu’ils soient d’origine interne ou externe, en Lorsque les parties adhèrent à la démarche,
émettant un Early Warning. Afin d’inciter le contrac-
teur à la pro-activité, le défaut de notification par l'utilisation des contrats NEC peut devenir un
l’entrepreneur d’un événement de risque porté par
le client est sanctionné par une réduction voire une vrai facteur de réussite des projets d’envergure.


perte des droits (coûts/délais) associés.

Après notification, les parties doivent conjointement


étudier le risque, sa probabilité d’occurrence ainsi
que les « mitigations » possibles. Cette obligation
se traduit par des dizaines voire des centaines de
notifications qu’il faudra émettre, suivre et clore et
donc par des ressources projet dédiées à ce suivi. pect de celles-ci et pourra se priver d’opportunités
contractuelles en cours de projet.
Cet exercice de prévention des risques impose de
disposer d’un planning qui reflète au plus près l’avan- Il en est de même concernant le suivi des coûts. Si
cement du projet et permet d’identifier le chemin cri- le contrat est rémunéré en remboursable ou selon
tique et les marges disponibles. le principe du « coût cible »(5) (Target Cost), l’entre-
preneur doit s’assurer d’être en capacité de justifier
Les standards NEC accordent donc une large place chacun de ses coûts et produire des prévisions de
à la définition du planning à fournir par l’entrepre- dépenses sur une base mensuelle.
neur, lui imposant de développer un planning de type
CPM(3) dynamique et de le mettre à jour régulière- Par ailleurs, quand ces mécanismes de rémunération
ment. Ils précisent que faute d’émission du premier s’appliquent, l’entrepreneur est rémunéré par le fee(6)
planning dans les temps définis au contrat, l’entre- appliqué sur les coûts. Or, ce fee fait l’objet d’un au-
preneur s’expose à une rétention de 25 % du montant dit de la part du client, lui permettant de connaitre
de ses factures jusqu’à émission de ce document(4). le montant des frais généraux de son co-contractant
De même, une demande d’extension de temps non mais également la marge réalisée. Ce niveau de
démontrée sur la base du planning contemporain transparence peut s’avérer perturbant pour une or-
impacté ne sera pas recevable. ganisation ou des chefs de projet qui n’ont l’habitu-
de d’exécuter ce type de contrat.

UNE GESTION DE PROJET À ADAPTER Contracter sur la base d’un marché NEC néces-
site donc d’en assimiler l’esprit et les outils, et de
Au-delà de l’impératif d’affecter aux projets les res- repenser et/ou d’adapter le mode de gestion du
sources nécessaires pour répondre aux obligations projet, l’organisation de l’équipe projet et d’inté-
contractuelles liées au suivi du planning, le rôle cen- grer la gestion du planning comme un véritable ou-
tral de la planification des activités, de la gestion du til de management du contrat. Ajoutés à une trans-
projet en anticipation ainsi que le niveau de trans- parence aussi bien dans la relation contractuelle
parence requis peuvent constituer, pour un entrepre- que dans les coûts, ces bouleversements peuvent
neur qui n’a pas été exposé à ce type de contrat, être profonds. Néanmoins, lorsque le contrat n’est
une modification significative de la gestion du pro- pas dénaturé dans son esprit et que les parties
jet au quotidien. Sans une prise de conscience de adhèrent à la démarche, l’utilisation des contrats
ces obligations dès la phase d’appel d’offre, l’en- NEC peut devenir un vrai facteur de réussite des
trepreneur sera rapidement en risque de non-res- projets d’envergure.

1-C
 lause 10 « The Employer, the Contractor, the Project Manager and the Supervisor shall act as stated in this contract and in a spirit of mutual trust and co-
operation ».
2 - Planning reflétant l’avancement réel du projet à l’instant considéré
3 - CPM = critical path methodology
4 - NEC 3 ECC (Engineering and Construction contract) clause 50.3
5-M
 écanisme selon lequel les co-contractants définissent le cout cible du projet et se partagent les gains ou les pertes constatés par rapport à ce coût cible en
fin de projet
6 - Cœfficient ou montant défini contractuellement et appliqué par l’entrepreneur sur les coûts remboursés par le client.r

9
DOSSIER

NEC3 MECHANISMS:
HOW TO MAKE THE MOST OF THEM?
PONTICELLI FRÈRES HAS NEC3 EXPERIENCE MOSTLY IN AFRICA AND ITS FEEDBACK IS VERY POSITIVE.

N “
EC3 is promoting an environment on get-
ting the work done, focusing on modern and
good project management so as to resolve
commercial matters, such as claims and other mat- Extra effort in the short
ters, quickly and fairly. Hence, the contract is direc-
tly administered by the project team, whose parties term leads to less
can choose the best strategy that is suitable for the
working conditions to carry out the project. In this difficulties in the long
way, the attitude and behaviour for a project team
running a successful NEC3 project should be open-
minded, willing to pay attention to different ideas,
term.


proactive in sorting out issues, respecting the other
Suganjah SHANTHIPAN party as a partner and with good communication
Titulaire d’un Master 2 en and teamwork abilities.
contentieux des affaires
de l’université Panthéon Some of the usual challenges experienced all over
Sorbonne Paris I et d’un an NEC3 project that parties have to deal with ensure that delays in the project are not incurred
Master en droit des affaires are: as a result of a lack of communication.
de l’université Panthéon • The parties should work in a spirit of mutual trust • The parties are encouraged to resolve any mat-
Assas Paris II, juriste de and co-operation. ters as soon as possible. In this way, disputes
formation, et Contract • The parties have to implement necessary ad- are avoided, or at least minimised. The NEC3
Manager au sein du ministrative resources in managing NEC3 speci- achieves this by applying foresight collaboratively
département Contrats de fic features. Nevertheless, such increased mana- which mitigates problems and reduces risk. It also
Ponticelli Frères. gement resources are generally considered to be has a clear division of function and responsibi-
compensated by higher chances of improved pro- lity that helps accountability and motivates people
ject outcomes, greatly reduced final account work to play their part in the contract and on the pro-
periods after completion and reducing the risk and ject. Claims and disputes will however arise out of
expense of long-running disputes. events where the contract scope is not clear. This
• Risks should be identified, discussed and jointly is especially true on large projects with multiple in-
managed by the parties at an early phase so that terfaces, unknown risks, and sometimes where the
their impact is managed and, where possible, re- scope is ambiguous in certain instances. It is impe-
duced. The early warning procedure of a poten- rative that the scope of work is clear, fully defined
tial risk is about preventing rather than curing and and without ambiguities.
encourages the parties’ efforts to be proactive ins-
tead of reactive against any risk. Correct commit- No matter in which country it applies, if NEC3
ment with the early warning procedure is the main mechanisms are well managed with enough re-
factor for a successful NEC3 project. If a party sources and a really collaborative approach,
fails to submit an early warning, it could then af- NEC3 objectives can be fulfilled in practice. This
fect the assessment of a compensation event. is a topic of behaviour and culture change.
• The parties are mutually focused on resolving Last but not least, NEC3 embodies that a project’s
any compensation event matters as soon as pos- success relies upon making decisions that promote
sible. Compensation events are submitted, as- value for money. It aims on sorting out costs as
sessed and approved on a forecasted cost basis. soon as possible opposed to leaving it to the end
This means that risk is split equally between the of the project, a final account claim dealt with by
parties. arbitration, or the courts. Extra effort in the short
• Timely responses to communications are impor- term leads to less difficulties in the long term. And
tant. Proper communication remains essential to this is probably why the NEC works so well.

10
DOSSIER

L’ACTUALITÉ
DES CONTRATS FIDIC
FIDIC A CONNU EN 2017 UNE ANNÉE PARTICULIÈREMENT PRODUCTIVE, AVEC LA PUBLICATION
DE 6 NOUVEAUX MODÈLES DE CONTRAT, DONT LA TRÈS ATTENDUE MISE À JOUR DE L’ICONIQUE
TRIPTYQUE DES CONTRATS FIDIC RED, YELLOW ET SILVER BOOKS 1999.

L
’édition 1999 aura rencontré un succès pla- l’édition 2017, dans le secteur des infrastructures(3)
nétaire sans précédent – son adoption comme comme du bâtiment(4).
modèle de contrat de référence par les bail-
leurs de fonds internationaux multilatéraux (Banque Il convient aussi de noter l’évolution majeure ap-
Mondiale, Banque Asiatique de Développement, portée par FIDIC en 2017 à ses contrats-types de
Banque Africaine de Développement, etc.) aura prestations intellectuelles. En qualité d’association
contribué à l’expansion de son utilisation dans plus internationale des ingénieurs-conseils, la mise à
de 150 pays, et a en corollaire également forte- jour du FIDIC White Book (Client-Consultant), qui
ment influencé le secteur privé : les contrats FIDIC datait de 2006, était vivement attendue du fait de
se sont imposés comme modèles de contrat utilisés quelques critiques essuyées par cette dernière ver-
dans un grand nombre d’opérations PPP, mais aussi sion, notamment concernant les processus de sus-
auprès de maîtres d’ouvrages privés multinationaux. pension et résiliation, la définition des niveaux de
Vincent Leloup (FCIArb, responsabilité des Parties, ou l’absence de dispo-
FDBF, MDRBF) est expert L’édition 2017 a bénéficié du fort retour d’expérience sitions explicites permettant de faire le lien entre le
en gestion de contrats de l’utilisation de l’édition 1999, et a introduit un rôle du FIDIC Engineer dans un contrat de travaux,
de construction. Double grand nombre d’évolutions telles que : et sa relation contractuelle afférente avec le maître
cursus ingénieur (Agro- - Renforcement du rôle central du FIDIC Engineer, d’ouvrage dans le White Book. L’édition 2017,
GREF) et juriste en droit point de passage incontournable pour toute récla- que j’ai eu le plaisir de corédiger, règle tous ces
de la construction (King’s mation de l’Entrepreneur(1) ; points, et apporte de nombreuses plus-values sur la
College, Londres), 20 ans - Rôle accru du Dispute Adjudication Board (DAB), manière de gérer les délais d’exécution, les modi-
d’expérience sur projets de devenant le Dispute Avoidance/Adjudication Board fications du périmètre des services, ou bien encore
construction internationaux (DAAB) – mobilisé systématiquement dès le début la propriété intellectuelle. Le White Book s’accom-
en entreprise travaux puis en du contrat(2), il a un rôle explicite non plus unique-
société d’ingénierie-conseil, ment de résolution rapide de litiges (84 jours) mais


il intervient en libéral depuis aussi de prévention de litiges;
quelques années pour des - Procédures détaillées d’administration de contrat,
prestations de formation, incluant étapes de gestion à respecter pas-à-pas,
conseil et résolution de et clairs délais associés,
litiges (comités de règlement - Procédures distinctes de gestion des réclamations, L’édition 2017 apporte
des différends, arbitrage). des différends et des modifications ;
Membre du Comité Contrats - Plus de réciprocité dans les obligations des par- de nombreuses plus-
de FIDIC, co-rédacteur du ties ; et
FIDIC White Book 2017 - Formalisme accru. values sur la manière
et rédacteur principal de la
mise à jour du FIDIC Green Il est encore trop tôt pour mesurer l’impact sur le mar-
de gérer les délais
Book (en cours), il est aussi ché de l’édition 2017. Comme pour chaque nou-
velle édition, plusieurs années seront nécessaires
fondateur et directeur des
études du DU International pour que 1) les maîtres d’ouvrages l’intègrent dans
d’exécution, le périmètre
Construction Contracts leurs processus de passation de marchés et 2) des
dispensé par l’Université contrats soient formés et apportent de premiers re- des services, la propriété
Paris-Panthéon Assas. tours d’expérience. On peut cependant noter que
d’ores et déjà plusieurs bailleurs de fonds ont si- intellectuelle...


gné un accord d’utilisation avec FIDIC, et que des
contrats sont en cours de préparation sur la base de

11
DOSSIER


pagne du Sub-Consultancy Agreement (marché de - Enfin, parmi les autres nouveautés sont à noter l’intro-
sous-traitance entre consultants) et du JV Agreement duction d’un Contract Risk Register et d’un Contract
(marché de co-traitance entre consultants). Risk Management Plan.
L’année 2019 est quant à elle marquée par la pu- L’Emerald
blication du FIDIC Emerald Book, dédié aux mar- L’une des principales plus-values de l’Emerald Book
chés contenant une majorité de travaux souterrains est donc de permettre d’anticiper l’imprévu (mais Book permet
(tunnels, barrages, etc.). Il s’agit d’un contrat de néanmoins prévisible) en définissant précisément com-
conception-réalisation établi sur la base du FIDIC ment adapter le contrat en conséquence sans avoir d’anticiper
Yellow Book 2017 auxquels des dispositions per- besoin de passer par une procédure fastidieuse de
mettant de couvrir les spécificités des travaux sou- réclamation nécessitant que l’Entrepreneur apporte l’imprévu en
terrains ont été intégrées, telles que : la preuve de son préjudice économique et temporel.
- La mise en place par le Maître d’Ouvrage d’un
Geotechnical Baseline Report (GBR), qui définit les Bien qu’un premier bilan d’utilisation de l’Emerald
définissant
conditions de sous-sol attendues dans l’exécution Book ne pourra raisonnablement être établi avant 2
des travaux, et face auquel l’Entrepreneur viendra à 3 ans, il convient de noter que le groupe de travail comment
s’engager sur des cadences d’excavation via un chargé de sa rédaction a collaboré avec les équipes
Schedule of Baseline. En cas de variation entre les projets du CERN à Genève pour sa préparation, et adapter le
conditions réelles et celles attendues, les cadences le projet du LHC à haute luminosité du CERN(5), in-
sur lesquels l’Entrepreneur s’est engagé seront utili- cluant de nombreux puits et galeries souterraines, contrat sans
sés pour ajuster automatiquement le délai d’achève- intègre les dispositions phares de l’Emerald Book.
ment des travaux, et le prix du marché (à la hausse passer par
comme à la baisse), sans nécessiter le recours à L'année 2020 verra pour sa part la publication en
une procédure de réclamations ou de modifica- fin d’année de la mise à jour du Green Book, dont une procédure
tion. Une façon simple et efficace de gérer l’habi- j’ai l’honneur d’être le rédacteur principal. FIDIC vise
tuel décalage entre prévision et réalité, avec des à ce que ce modèle court de contrat ne soit plus uni-
mécanismes d’ajustement prédéfinis dans le contrat ; quement réservé à des marchés de faible montant,
fastidieuse de
- Le GBR définit des conditions limites au-delà des- mais à tout marché pour lequel les parties souhaitent
quelles les conditions réelles seront considérées bénéficier d’un cadre contractuel simplifié où les dis- réclamation.


comme imprévisibles (et non seulement imprévues) positions soient limitées aux droits et obligations es-
et traitées via une procédure usuelle de réclamation sentiels des Parties. En somme, que le Green Book
- Bien que le contrat soit au forfait, les travaux d’ex- voit son champ d’utilisation élargi et qu’il puisse être
cavation sont payés via prix unitaires. Il intègre éga- vu comme une alternative aux contrats FIDIC Red et
lement un Completion Schedule, qui sera rempla- Yellow Books dans certains cas. Dissocier l’essen-
cé par le planning des travaux (the « Programme ») tiel de l’accessoire, et valoriser la simplicité comme
en cours de mise en œuvre du contrat et qui s’ap- marque de sophistication, n’est pas un mince enjeu
puie sur les cadences renseignées par l’Entrepre- et je vous donne donc rendez-vous dans un an pour
neur dans son Schedule of Baselines. ce prochain contrat FIDIC!

POUR ALLER PLUS LOIN :


Ceux intéressés pour devenir Contract Managers sur des opérations de construction internationales sont invités à consulter le
programme proposé par le D.U. International Construction Contracts, dispensé par l’Université Paris 2 Panthéon-Assas et que j’ai
créé il y a 4 ans avec le Professeur Périnet-Marquet. Les cours sont entièrement en anglais, se déroulent de Septembre à Mai sur un
rythme de 3 jours par mois et pour un volume total de 158 heures.
https://cfp.u-paris2.fr/fr/formations/offre-de-formation/diplome-duniversite-du/diplome-duniversite-international-construction

1 - L’édition 1999 permettait de saisir directement le Dispute Adjudication Board pour quelques sujets de différend, sans attendre de décision formelle de
l’Engineer
2-D
 ans le FIDIC Red, Yellow comme Silver Book, alors que cela n’était uniquement le cas que dans le Red Book dans l’édition 1999
3-E
 xemple : lignes ferroviaires à grande vitesse en Inde
4-E
 xemples : extension du siège de la BEI à Luxembourg, ou extension du Palais des Nations à Genève.
5 - h ttps://home.cern/fr/science/accelerators/high-luminosity-lhc

12
DOSSIER

LA FIDIC, SES MODÈLES CONTRACTUELS


ET DES EXEMPLES DE PRATIQUES
INADÉQUATES FACE
À DES RISQUES CONNUS
LA FÉDÉRATION INTERNATIONALE DES INGÉNIEURS- classique : c’est le marché de travaux connu sous
CONSEILS (FIDIC) A ÉTÉ CRÉÉE EN 1913 À BRUXELLES le nom de Livre Rouge (« Red Book ») qui a connu
À L’INITIATIVE D’INGÉNIEURS FRANCOPHONES. différentes éditions en 1957, 1967, 1973, 1987,
AUJOURD’HUI, C’EST UNE INSTITUTION LOCALISÉE 1999 et 2017.
À GENÈVE. ELLE RECOMMANDE LA RÉALISATION • Une version proche du Red Book a été entérinée
D’INVESTISSEMENTS RESPONSABLES DANS LE CADRE et publiée par quelques grands bailleurs de fonds
DE PROJETS DE CONSTRUCTION, NOTAMMENT PAR LA internationaux sous le nom de Livre Rose (« Pink
MISE À DISPOSITION ET LA PROMOTION DE BONNES Book ») ; ce contrat a été publié en 2005 pour l’édi-
PRATIQUES ET D’OUTILS. tion test, en 2006 pour la 1ère édition en 2010
pour la 2nde édition.
• La conception du produit final est laissée à l’ini-
tiative de l’entrepreneur sur la base d’un important

L
transfert de risques du maître de l’ouvrage en direc-
es outils les plus célèbres promus par la FIDIC tion de l’entrepreneur : c’est le marché clé en main
sont les modèles de contrats (« contracts » dont (« turnkey ») qui a été édité en 1995 sous le nom
l’objet immédiat est en tout ou partie de livrer de « Livre Orange » (« Orange Book »), puis en
des travaux) et d’accords (« agreements » dont l’objet 1999 et en 2017 sous le nom de « Livre Argent »
immédiat n’est pas de livrer des travaux). La pratique (« Silver Book »).
se réfère à ces modèles par des codes de couleur • La conception du produit final est laissée à l’ini-
(le premier modèle publié a été appelé le livre rouge tiative de l’entrepreneur sur la base d’un partage
ou « red book » en raison de sa couverture rouge des risques classique sans lui imposer d’assumer
et l’usage est demeuré pour les autres modèles). ni exploitation ni maintenance : c’est le marché de
conception-réalisation connu sous le nom de Livre
Pour les modèles de contrat, la question se pose tou- Jaune (« Yellow Book ») qui a connu différentes édi-
jours de sélectionner le modèle le plus adéquat pour tions en 1963, 1980, 1987, 1999 et 2017.
Gilles Castan, Associate satisfaire aux exigences du projet. On peut présen- • La conception du produit final (installation neuve)
chez Currie & Brown, ter la situation de la façon suivante : est laissée à l’initiative de l’entrepreneur sur la base
Adjudicateur accrédité par • Les travaux envisagés concernent le percement de d’un partage des risques classique en lui imposant
la FIDIC, Contract, claim et tunnels : Livre émeraude (« esmeralda book ») dont d’assumer exploitation et maintenance : c’est le mar-
Risk Manager la publication est intervenue en 2019. ché de conception-réalisation-exploitation (la main-
• Les travaux envisagés concernent le dragage tenance est sous-entendue au titre de l’exigence du
sous-marin : Livre bleu (« Blue Book) qui a été pu- maintien en condition opérationnelle) connu sous
blié en 2001 pour l’édition test, en 2006 pour la le nom de « Livre Or » (« Gold Book »). L’installa-
1ère édition en 2016 pour la 2nde édition. tion à rénover fera peut-être l’objet du Livre Bronze
• Les travaux envisagés concernent des travaux (« Bronze Book ») que la FIDIC annonce comme es-
simples, rapides et peu onéreux : Livre vert (« Green compté depuis plusieurs années.
Book) qui a été édité en 1999.
La diffusion des contrats FIDIC a connu une ampleur
Les travaux envisagés sont autres que ceux sus-men- sans égale depuis 2005 lorsque les bailleurs de fond
tionnés : internationaux ont largement choisi de les utiliser en
• La conception du produit final (« Travaux Perma- tout ou partie comme trame de conditions générales
nents » dans la terminologie FIDIC) est imposée à (ex. : les achats de travaux seuls sont réalisés en
l’entrepreneur qui en assure les études d’exécution utilisant le Livre Rose qui est un Livre Rouge qui tient
et la réalisation sur la base d’un partage des risques compte de la présence d’un bailleur de fonds inter-

13
DOSSIER

nationaux ; le contrat « clé en main » de la Banque - s i l’absence de mention des forces auxquelles les
Mondiale » est un modèle dont la moitié des clauses ouvrages étaient soumis était une erreur du Consul-
reprend le modèle FIDIC correspondant). tant dont le client devait assumer les conséquences
à l’égard de l’entrepreneur ou bien
Il réside néanmoins des difficultés ou interprétations - si l’entrepreneur n’avait pas commis une erreur en
possibles dans des cas où les parties n’ont pas ne demandant pas des informations dont l’absence
proprement géré dans la rédaction des contrats les était criante ou bien
risques juridico-techniques. Ci-dessous des exemples - s’il convient de faire un partage de responsabili-
de problèmes récemment rencontrés issus de l’usage té et comment.
du Livre Rouge :
Dans la partie technique du contrat, est en cause la
Exemple n°1 façon dont les pièces écrites ont été rédigées par
Le client a demandé à un consultant de faire un design des gens qui n’ont pas été formés pour la rédaction
puis de préparer un contrat soumis au Livre Rouge. de pièces contractuelles.
L’accord de consultant comportait le devoir de faire
le design en obligation de moyens (« skill and care ») Exemple n°4
à certains endroits et en obligation de résultat (« fit Le contrat fondé sur le Livre Rouge n’a pas modifié
for the purpose ») à d’autres. Aujourd’hui des sinistres la sous-clause 12.3 qui prévoit les conditions de
sont apparus, il est avéré que le design respectait les remise en cause de prix unitaire. Les conditions de
« bonnes pratiques de la profession » mais n’était pas variations ont été rencontrées et l’ingénieur, chargé
conforme à « l’usage auquel il était destiné ». Le droit d’administrer le contrat, rencontre des difficultés pour
applicable étant de l’obédience Common Law, la reconstituer un prix nouveau : comment reconstituer
question se pose de l’extension à l’Accord de consul- les nouveaux frais généraux, les prix inclus entre
tant suivant la jurisprudence de la Cour Suprême du 100 % de la quantité théorique et le seuil de tolé-
3 août 2017 entre MT Højgaard A/S et E.ON Cli- rance contractuel varient-ils ou pas ? Faute d’avoir
mate and Renewables UK Robin Rigg East Ltd qui, précisé ces éléments, d’avoir décidé que les taux
face à cette problématique, a imposé à l’entrepre- étaient fixes ou d’avoir écarté le prix aux quantités
neur de livrer un design conforme à sa destination. au profit d’un prix forfaitaire (ce qui est parfaite-
La question ne se poserait pas si la façon de procé- ment possible), les parties subissent une incertitude
der au design avait été traitée dans un seul endroit et l’ingénieur ne parviens pas à émettre une « de-
puisque la Common Law offre la possibilité de le faire. termination » au titre de la sous-clause 3.5. Il a ga-
gné son contrat financé par un bailleur de fonds
Exemple n°2 international car il était le moins cher mais il ne dis-
Face à un design insuffisant produit par un consul- pose pas des ressources en qualité suffisante pour
tant, l’entrepreneur a été « invité » à produire un com- traiter du problème.
plément. Il a accepté sous réserve de ne pas enga-
ger sa responsabilité ce sur quoi l’ingénieur chargé En conclusion, s’il est certain que les modèles
d’administrer le contrat ne s’est jamais prononcé. de contrats FIDIC sont parfaitement adaptés à la
Suite à un sinistre, son design a été ultérieurement construction, il est regrettable que certains opéra-
considéré comme insuffisant. La question se pose à teurs économiques profitent de leur position pour
nouveau de savoir si un acteur de la construction imposer des pratiques contractuelles inadéquates.
peut produire un design sans en assumer les consé-
quences, même s’il n’a pas touché un centime pour
cela. Classiquement rencontré en Livre Rouge, le


sujet aurait pu faire l’objet d’un certain nombre de
dispositions dans les Conditions Particulières plutôt
que de conduire les parties à de pénibles discus-
sions pré-contentieuses susceptibles de générer un
contentieux ouvert. La diffusion des contrats FIDIC a connu une
Exemple n°3 ampleur sans égale depuis 2005, lorsque
Dans tous les cas d’utilisation du Livre Rouge, l’En-
trepreneur convertit les études de design en études les bailleurs de fond internationaux ont
d’exécution. Le Consultant a communiqué des plans
qui n’expliquaient ni ce qu’étaient les seuils de ré-
sistance requis ni les forces auxquelles les ouvrages
largement choisi de les utiliser en tout ou
étaient soumis. Face à un sinistre ayant pour origine
la rencontre de forces très supérieures à la résis- partie comme trame de conditions générales.


tance des matériaux employés, la question se pose
aujourd’hui de savoir :

14
DOSSIER

JCT CONTRACTS EXPLAINED


A VERY BRITISH FORM OF CONTRACT

HISTORY JCT CONTRACTS - MAIN FEATURES AND


Since the 1930s the most common and readily un- EDITIONS
derstood standard form contracts in the UK have been The latest edition of the JCT family of contracts is
published by the Joint Contracts Tribunal (JCT). The 2016. Over the past twenty years, full suite changes
JCT is a membership body representing employer, have been made in 1998, 2005 and 2011.
contractor, specialist trades and professional inte- Changes have been largely due to legislative and
Louis Cointreau, Directeur rests. JCT contracts are most popular with UK pri- regulatory changes - only the very latest editions of
régional France et pays vate sector clients and commercial developers and the forms are published and recommended for com-
francophones, Systech for building and construction works for all types of mercial use, subject to interim amendments. There
International contracting arrangements. They are seen as tradi- are now over 100 separate forms, sub-contracts
tional forms in terms of their drafting and legal style. and guides within the 2016 family of documents.

JCT (2016) NEC4 (2018) FIDIC 2017

Based on traditional forms and expanded A radical departure from traditional Based on traditional forms, expanded
over time to cover all construction works contracts over time to cover all construction works

Legalistic style and format, general Plain English, no legal terminology, range Legalistic style and format, general
conditions of contract, bespoke of options within ECC, general conditions, conditions of contract, bespoke
amendments amended by Z clauses amendments

Legal document rather than management Drafting encourages effective project Legal document rather than management
procedures. Constructing Excellence management and collaborative working. procedures
contract is based on partnering and Includes Risk Register and Early Warnings
collaborative working but time limits impose burdens on Project
Managers and Contractors

Contract Administrator Project Manager with full delegated Engineer, some decisions needed from
powers from Employer Employer

Pricing and payment mechanisms ECC has options for choice of contracting Pricing and payment mechanisms
dependent on contract choice and arrangements (A-F), is a modular, flexible dependent on contract choice.
arrangement e.g. lump sum, re- contract and payments are based on
measurement, cost reimbursement which option applies

Separate Variations, Extension of time Compensation Events Separate Variations, Extension of time
and claims clauses and claims clauses.

Adjudication and Litigation Adjudication (with Dispute Avoidance Dispute Adjudication Avoidance Board
Board provisions) and litigation (DAAB) and arbitration

No international use Limited international take up International track record

15
DOSSIER

The JCT forms attempt to regulate for all circums- was published in 1993 as a radical departure from
tances, types and size of works but are seen as re- the same.
presenting an adversarial rather than a collabora- As outlined in the comparison table above, the main
tive approach to contracting. This arises from the contractual features of JCT Contracts are closer to FI-
very drafting of the forms, which requires consensus DIC than NEC provisions. For instance, while both
among employers/clients, contractors or specialist JCT and FIDIC feature separate Variation, extension
trades, while all have partly diverging commercial of time and claims clauses, NEC introduces Com-
interests. In addition, the need to reach compromises pensation Events.
on detailed contract terms requires significant time,
with an impact on the dates of issuance and update USE OF JCT CONTRACTS
of the JCT forms. Until the mid-2015, NEC saw its use by UK practi-
JCT contracts provide for the four main UK contrac- tioners increase year after year, whereas JCT’s own
ting approaches: traditional; Design and Build; Ma- use appeared to be receding as a consequence. But
nagement contracts and Partnering. All main contract the latest edition of the Contracts in Use surveys from
forms are aligned to match terms and provisions in the National Building Specification (NBS) showed
the supporting sub-contracts and services contracts. a dramatic reversal of this trend, as presented in the
below graph. While NEC contracts are undoub-
JCT ALTERNATIVES - NEC AND FIDIC tedly the contract of choice for most public sector
While JCT and FIDIC arise from traditional forms works, the private sector appears to favour the use
of contracts, the New Engineering Contract (NEC) of JCT forms. –

Which contracts have you/your organisation used most often?

62 2018
39 2015
JCT
48
2012
60
2011
14
30
NEC
22
16

5
11
Bespoke
9
10

4
7
FIDIC
4
3

0 10 20 30 40 50 60 70 80 90 100

Source: National Construction Contracts and Law Survey, National Building Specification, RIBA Enterprises, 2015 and 2018

The above graph also shows the relatively limited contractors and professionals and are used ‘most of-
use of FIDIC forms in the UK, evidencing JCT’s preva- ten’ in the private sector and with commercial clients.
lence among traditional standard forms of contract in It is therefore essential for any international stakehol-
its land of origin. Conversely and unlike FIDIC forms, der of a UK-based construction project to be familia-
JCT forms are seldom, if at all, used in other countries. rised with the contents and operation of JCT contracts

CONCLUSION
JCT contracts are used in the UK for a range of buil-
ding projects and types, are well understood by

16
DOSSIER

OPEN SOLAR CONTRACTS


POWERING THE ENERGY TRANSITION
THE GLOBAL ENERGY SYSTEM IS IN AN INEVITABLE TRANSITION TO A MORE SUSTAINABLE
FUTURE, WITH RENEWABLES PLAYING A CENTRAL ROLE. THE DECREASE IN THE COST OF SOLAR
POWER HAS BEEN PARTICULARLY REMARKABLE. THE GLOBAL WEIGHTED-AVERAGE LEVELISED
COST OF ELECTRICITY (LCOE) FOR UTILITY-SCALE SOLAR PHOTOVOLTAICS (PV) FELL AN
ESTIMATED 77 % BETWEEN 2010 AND 2018(1). SOLAR POWER CAN NOW COMPETE HEAD-ON
WITH NON-RENEWABLE POWER GENERATION.

Y
et, solar power generation assets (SPGAs) are It also should ease the due-diligence processes for
not comparable to conventional power gene- financiers and pave the way for project aggrega-
ration assets since they are typically smaller tion and securitisation.
in scale, highly modular, and intrinsically less com-
plex. They also have a front-loaded cost profile cha- The objective is to further reduce solar power LCOE
racterised by no fuel costs and limited operation and and further accelerate access to affordable, reliable,
maintenance (O&M) expenditure. The relative sim- sustainable and modern energy for all, United Na-
plicity and replicability of solar PV systems present tions's Sustainable Development Goal #7.
an excellent opportunity to industrialise the transac-
tional work. Contractual standardisation has been The Open Solar Contracts initiative offers six core
proven effective in other sectors, from construction contract types spanning different transactions in the
to derivatives. solar power supply chain(2).
Jean-Pascal Pham-Ba, These are:
Secrétaire Général et Porte In the aftermath of COP 21, the International Re- 1. Implementation Agreement
Parole de Terrawatt Initiative newable Energy Agency (IRENA) and Terawatt Ini- 2. Power Purchase Agreement
tiative (TWI) undertook a joint effort to simplify and 3. Supply Agreement
streamline the contractual framework for solar power 4. Installation Agreement
and thereby reducing negotiations to a limited num- 5. Operation and Maintenance (O&M) Agreement
ber of critical technical and financial terms, enabling 6. Financing Term Sheet
all parties involved in a transaction to save conside-
rable time and money. Work on the contracts can be supported by re-
view of specific model clauses, in order to reduce
Contractual standardisation also enables the broad complexity and deal with cross-cutting matters in a
dissemination of best practices. By translating best consistent manner.
practices into universally applicable templates, stan- Such matters include:
dardisation can disseminate market-tested solutions 1. Governing Law
on a global scale. For instance, best practices in risk 2. Dispute Resolution
allocation, when replicated more broadly, can avoid 3. Corruption and Sanction
cases, where the risks are not allocated to the par- 4. Force Majeure
ties that are best able to manage them and hence
the risks, are overpriced (i.e., priced as if they are The Open Solar Contracts approach follows four
more probable or severe than they are). main principles:

Simplicity means that contracts have a lean struc-


ture. Definitions and cross-references are harmonized
across the entire suite.

All contracts are based on explicit common assump-


tions, making them consistent accross the value chain
as well as easy to understand and implement.

17
DOSSIER


Each contract template comprises: (for example, a split approach to the conventional
- general terms and conditions in the main body of engineering, procurement and construction (EPC)
the agreement, which are anticipated to be accep- contract structure). This helps to identify smarter, more
table in all jurisdictions, including appropriate op- effective solutions to produce bankable contract do- In the aftermath
tions to fit most circumstances, cumentation. The drafting is also thought to be more
- a Key Information Table, containing all the negiated easily digitalized with limited open-ended issues to of COP 21,
variables of a specific transaction, automatize, in the future, the contractual performance.
- several schedules where project-specific and ju- the IRENA and
risdiction-specific details may be included, and, Collaboration places inclusivity at the core. The
- footnotes highlighting instances where particular contract templates were developed through a colla- Terawatt
consideration needs to be given to specific clauses borative and consultative process benefiting of inputs
to ensure that such provisions are suitable for the
particular project circumstances and jurisdiction.
from top-tier law firms, lenders, developers, contrac-
tors and industry association(3). All stakeholders are
Initiative
more than welcomed to review the contracts and
In practice, some provisions may need to be tailored provide their feedback, which will help to balance undertook a
to the commercial specifics of a given transaction various perspectives and with continually improving
for which legal advice should be sought. Howe- the contract templates in line with market needs. joint effort to
ver, one of the primary benefits of the Open Solar
Contracts is that they are straightforward and use The resulting package of contract templates offers simplify and
concise language. a logical solution using tried-and-tested principles
to achieve a simple, high-quality, and user-friendly streamline the
Fairness means balancing risk allocation. Investment contractual suite for SPGAs. The templates are in-
risks are allocated among stakeholders in a fair and tended to be used in conjunction with one another contractual
balanced manner. Based on a well-defined risk uni- to ensure that the scope of work and risks are ap-
verse, each set of risks is allocated to the party best propriately allocated.
able to manage them cost-effectively, the initiative
framework for
considers that the allocation is mutually agreeable IRENA and TWI are pleased to offer the Open So-
by all parties. lar Contracts under Creative Commons license to solar power.


the global solar power community.
Innovation means applying new thinking to existing
practices not only by providing simplified processes, Open Solar Contracts can be downloaded at
but also by proposing new substantial approaches https://opensolarcontracts.org.

1 - IRENA (2019a), Renewable power generation costs in 2018, International Renewable Energy Agency, Abu Dhabi.
2 - In English language only. Partners to develop French and Spanish languages versions are welcomed.
3-W
 orkstream leaders are Baker McKenzie, Covington,Dentons, Eversheds Sutherland, Freshfields Bruckhaus Deringer, Latham & Watkins, Milbank, Norton
Rose Fullbright, ReedSmith and Solar Power Europe

18
DOSSIER

ALLIANCE CONTRACTS
and through an EU-compliant,
two-stage contract. Arup in their
2008 report to the UK Office of

THE F.A.Q.
Government Commerce (OGC)
described PPC as “a procure-
ment system that provides the pro-
cesses and mechanisms for plan-
ning, procurement and delivery
of construction works. The system
is based on the application of a
members use that shared together or individually in order number of processes and it is es-
knowledge to improve project to improve economic and social sential that the processes stated
outcomes rather than for their in- value, by means of what contri- are applied.”
dividual benefit. butions and by what deadlines?
• How will alliance members be Early contractor involvement is in-
Many procurement models and rewarded for their work? tegral to the two-stage structure
contracts provide little time or op- • How will the alliance members of a PPC2000 project alliance,
portunity for consultants, contrac- reach decisions, manage risks including:
tors, subcontractors, manufacturers and avoid disputes? • The conditional preconstruction
and operators to integrate their phase appointment of all team
work. Instead, these models at- King’s research distinguished members and the preconditions to
tempt to fix prices without joint between the following types of the construction phase proceeding
David Mosey PhD, Director cost analysis and to transfer risks alliance contract: • The processes of preconstruc-
of the Centre of Construction without joint risk management, • A ‘project alliance contract’ tion phase design developed by
Law and Dispute Resolution often encouraging misunderstan- where a team is brought together the design team, coordinated by
at King’s College London dings and disputes that lead to to deliver a single project a lead designer and approved
cost overruns, delays and defects. • A ‘framework alliance contract’ by a core group
Propos recueillis par where a long-term relationship is • The processes for appointing
Louis Cointreau By undertaking collaborative established linked to the award of subcontractors and suppliers by
construction procurement through contracts for a number of projects, approval of business cases or by
What defines an « alliance an alliance, a team should im- so that a team can use lessons mini-competitions organised by the
contract » and what makes it prove the quality of design, cost learned on one project to improve main contractor, with all proposals
distinctive from usual standard and risk data, and should thereby the delivery of other projects. subject to core group consultation
forms? align the parties’ commercial in- • The build-up of the cost data
terests, setting out new processes A project alliance contract such that leads to agreement of an
An alliance can be described as and relationships through which as PPC2000 integrates the team agreed maximum price that can-
a collaborative and integrated they develop, share and apply members and their work through not exceed the previously agreed
team brought together from across information in ways that improve direct multi-party relationships budget.
the supply chain, who share a set the design, construction and ope-
of common goals aligned with ration of their projects.


client outcomes and who work
under agreed incentives. A contract governing an al-
liance should go beyond any
Construction projects should other standard form by creating
always be a team endeavour, yet relationships and processes that
Many procurement models
collaboration among individuals answer the following questions:
engaged on a project or pro- • How is the alliance created, and contracts provide little
gramme of work is only made pos- between which members and can
sible by integrating the differing additional members be added? time or opportunity for
needs and commercial priorities • Why is the alliance created,
of the organisations who employ what are the measures and tar- consultants, contractors,
them. Knowledge is power, and gets for its success and how is it
the legal and commercial tests of brought to an end if it does not subcontractors,
collaborative construction procu- succeed?
rement under an alliance include:
• Firstly, whether team members
• How is each stage of the
agreed scope of works, services
manufacturers and operators
build up shared knowledge at a and supplies authorised, in what
time when it can be used to im- stages and to which alliance to integrate their work.


prove project outcomes members?
• Secondly, whether team • What will alliance members do

19
DOSSIER


A framework alliance contract used the same approach under and suppliers … across 30 diffe-
such as FAC-1 creates a mul- PPC2000 to deliver 26 % agreed rent disciplines”
ti-party structure connecting al- post-tender cost savings and other • “Additional employment and
liance members that include one improved value, including a re- The avoidance skills opportunities”
or more clients and any combi- duced footprint for the entry buil- • Lower bid costs for other al-
nation of selected consultants, ding and energy centre using of disputes is liance members, “specifical-
contractors, suppliers and provi- lessons learned from an earlier ly £719 per million of turno-
ders engaged on any number of alliance prison project, plus va- one objective ver (under SCMG) as against
projects. It sets out: lue engineering to adopt an alter- £4,808 per million of turnover
• the reasons why the framework
alliance is being created, stating
native lighting solution previously
used on alliance projects in Scot-
of collaborative (under the comparable traditio-
nal bid)”. (https://www.gov.uk/
its agreed objectives, success land. (http://constructingex- government/publications/procu-
measures, targets and incentives cellence.org.uk/wp-content/
construction rement-trial-case-study-social-hou-
together with agreed exit routes uploads/2015/12/Trial-Pro- sing-refurbishment).
if agreed targets are not fulfilled jects-North-Wales-Prison-Case- procurement
• the procedures by which work Study_Final.pdf). These prototypes led creation and
will be awarded to alliance through publication in 2016 of the FAC-1
members, whether under a direct An FAC-1 prototype was the framework alliance contract which
award procedure or a competi- multi-party framework alliance an alliance has been adopted on UK procu-
tive award procedure and also contract established by the Mi- rements totalling over £42 billion.
under early standard form orders nistry of Justice, which reduced contract. For example, Futures Housing


• provision for the ways in which operating costs of £10 million, Group used FAC-1 to integrate
the alliance members agree to reduced the burden on industry the work of 23 small contractors
seek improved value, working to- of £30 million and achieved pro- under a £30 million works pro-
gether through agreed alliance curement risk mitigation of £2 mil- gramme, saving an average of
activities in accordance with an lion, in all cases by means of: 9 % against previous prices. In
agreed timetable • “Solid governance structure the private sector the UK Foot-
• provision for agreed template through a Strategic Core Group ball Foundation, Sport England
project documents that include comprising representatives from and the Football Association used
any one or more forms of project the Ministry of Justice and the Al- FAC-1 to integrate the work of
contract for use in any jurisdiction. liance suppliers” five contractors and modular sup-
• “Standardised suite of processes pliers with two consultant firms un-
To w h i c h e x t e n t a r e s u c h and contract templates… used der a £150 million national pro-
contracts used in the UK and to ensure consistency and ease gramme for construction of new
around the world? of use” sports-ground changing rooms.
• “Early engagement of the sup-
PPC2000 has been successful- ply chain… encouraged by the The first UK local government user
ly adopted in the UK on a wide two stage approach”.(www.gov. of FAC-1 was London Borough of
variety of projects by up to 7 % uk/government/publications/go- Greenwich on a £20 million pro-
of all UK clients. It is used exten- vernment-construction-task-groups). gramme of mechanical and elec-
sively by the UK Ministry of Jus- trical works, while the nationwide
tice, including as the basis for Another FAC-1 prototype was the LHC local government consortium
integrating the teams and pro- SCMG £200 million multi-party have adopted FAC-1 to procure
cesses that support numerous housing framework alliance which programmes of schools and com-
projects adopting Building Infor- achieved post-tender “savings ave- munity buildings worth £5.5 bil-
mation Modelling (‘BIM’). Using raging 14 %” plus: lion in England and Wales and
PPC2000 with BIM, the Ministry • “Reduced risks, costs savings £800 million in Scotland. The
of Justice Cookham Wood team and time savings through acce- smallest FAC-1 programme so far
achieved agreed cost savings lerated constructor/supply chain is a £7.5 million procurement by
of 20 %, reduced their construc- briefing” Southern Housing Group.
tion programme from 50 to 44 • “Subcontractor/supplier inno-
weeks (with a consequent saving vations in proposed new mate- The largest user of FAC-1 is by
of £85,000 in time-related site rials and specifications” and ex- the UK Crown Commercial Ser-
overheads) and agreed important change of best practice between vice, firstly on their £2.8 billion
design improvements. (https:// specialist competitors” national frameworks of project
www.gov.uk/government/publi- • “Improved repair and mainte- managers and architects, where
cations/procurement-trial-case-stu- nance” and “more sustainable so- the appointed firms will enter into
dy-cookham-wood-prison ). lutions” FAC-1 contracts with each other
• “Development of opportunities in order to agree ways to deliver
The North Wales Prison team for local tier 2/3 sub-contractors better value services to their Go-

20
DOSSIER

vernment clients. Crown Commer- connect alliance members to each for improved value. This system re- documents, incomplete or late
cial Service have gone on to use other, to the wider supply chain presents probably the most impor- designs, inadequate site investi-
FAC-1 for their £1.2 billion mo- and to other stakeholders tant innovation to emerge from the gations or unrealistic deadlines.
dular programme and their £30 • Create timetables and deci- King’s research. It is a process of Therefore, we need to examine
billion contractor frameworks, the sion-making processes that sup- collaborative procurement that en- how the potential causes of dis-
latter being the largest ever UK pu- port consensus and that enable ables a client (including a public putes can be addressed by new
blic procurement. efficient progress. sector client) to explore improved contractual commitments that en-
arrangements with subcontracted sure earlier project planning, bet-
FAC-1 includes no English law A project alliance such as PPC supply chain members through ter integration of roles and lear-
provisions and has been demons- 2000 sets out the means and a sequence of agreed activities ning from project to project.
trated to work under civil law sys- timescales whereby a team can led by one or more main contrac-
tems with minimal amendments. work together to complete pre- tors. It was used, for example, The avoidance of disputes is one
So far, it has been translated construction phase design, cos- by Surrey County Council and objective of collaborative construc-
and adapted for publication in ting and risk management in suffi- Kier on their highways alliance, tion procurement through an al-
German, Portuguese , Bulgarian cient detail for the parties to agree where contractual systems now liance contract. For this purpo-
and Italian. Licences have been that the project should proceed to embodied in FAC-1 created im- se it is essential that an alliance
granted for translations of FAC-1 construction. The 2008 Arup re- proved supply chain relationships contract creates a system for the
into Russian and Spanish. port observed that PPC2000 “is that led to: active management of risks, such
based on a two-stage tendering • agreement by Alliance as the FAC-1 “Risk Register” which
Early uses of FAC-1 in Italy include process whereby time and cost Members of 12 % post-tender is kept up to date by an “Alliance
as a BIM integrator on a school data is developed incrementally cost savings which were sustained Manager”, subject to approval by
project and as the integrator of and reported on an open-book over a five-year period a “Core Group” of agreed indivi-
a public private partnership for basis. This means that there can • “Improved whole life value, in- duals. The FAC-1 core group also
a University development project. be a focus on value at all material cluding agreement of a ten-year acts as a forum through which al-
FAC-1 has also been accepted points and the contract can still en- warranty for material and pave- liance members can raise issues
for use in Bulgaria as the integra- able the parties to withdraw if the ment design” with each other in order to re-
tor of supply chain relationships value profile is not satisfactory”. • “Improved quality control solve problems before they be-
and added-value processes on a through joint risk assessments and come disputes.
German Government project and A framework alliance contract integrated team agreement of ap-
in Germany on a large commer- such as FAC-1 can go further by propriate surface treatments and In assessing risks, contractors
cial and residential private sector strengthening the detailed pre- monitoring work on site” and other providers need to un-
project. In addition, the European construction phase planning for • “Improved apprentice commit- derstand how the achievement
Bank for Reconstruction and De- each project, so that individual ments” of agreed objectives and suc-
velopment has obtained a brie- construction contracts for speci- • “Lean programming of indivi- cess measures affects the future
fing on FAC-1 and has decided fic projects are created only once dual tasks leading to time savings” award of work. FAC-1 provides
to review its potential value under preconstruction phase processes • “Innovation through collabo- clarity as to which alliance targets
pilots with selected clients, linked have been satisfactorily comple- rative working, for example to are so important that a failure to
to the project contract forms used ted. In this way, the framework increase recycling and reduce meet them will require urgent ac-
in their respective jurisdictions. Its alliance contract acts as the pre- landfill”. tion and may ultimately determine
first FAC-1 pilot is a mining pro- construction phase contract for ( h t t p s : / / w w w. g o v. u k / g o - whether a member’s alliance ap-
ject in Kazakhstan. each project under which agreed vernment/publications/pro- pointment may be terminated. It
activities for design development, curement-trial-case-study-re- also includes an “Early Warning”
price and supply chain develop- port-highways-maintenance). system enabling notification to the
What contractual processes can ment, joint risk management and core group of the reasons behind
be implemented to foster colla- agreement of a construction phase any issues or obstacles that are
boration between parties with programme are undertaken. Be- What is your answer to the cyni- encountered.
differing commercial interests? cause a framework alliance cal minds who say that construc-
contract can give rise to the pros- tion disputes are inevitable? All the above systems follow
The members of a project alliance pect of a series of projects, the similar structures included in
should: safeguarding of a party’s reputa- Much of the intellectual energy PPC2000, a contract from that
• Start working together at a tion linked to the award of future of lawyers and other professio- has been referred to the courts
time when their collaborative re- projects is more likely to support nal advisers in the construction only twice in 19 years. Case
lationships can be developed and commitments to the agreed rela- sector is devoted to the resolu- studies of PPC2000 can be
when project value can be im- tionships. tion of disputes, which add no found at http://ppc2000.wi-
proved value for clients and discourage serhosting.com/wp-content/
• Describe clearly the ways in FAC-1 also incorporates “Supply innovation by the industry. By the uploads/2016/12/10-Year-
which they will implement va- Chain Collaboration” procedures time a project starts on site, the Anniversary-PPC-and-5-Year-TPC.
lue-adding processes which set out alternative ways im- die is already cast for many of pdf, and case studies of FAC-1
• Establish relationships that are prove supply chain integration the typical causes of these dis- can be found at www.alliance-
fair, open and consistent and that and to create new opportunities putes, for example poor tender forms.co.uk.

21
DOSSIER

CONTRATS ICHEME : UN ATOUT


POUR LES PROJETS INTERNATIONAUX
LES CONTRATS ICHEME ONT ÉTÉ CRÉÉS À PARTIR DE 1968 PAR L'INSTITUTION OF CHEMICAL
ENGINEERS (ICHEME), INSTITUTION PROFESSIONNELLE MONDIALE D'INGÉNIERIE POUR LES
PROFESSIONNELS IMPLIQUÉS DANS LES INDUSTRIES CHIMIQUES, DES PROCÉDÉS ET DES
BIOPROCÉDÉS. ILS SONT DESTINÉS À ÊTRE UTILISÉS DANS LE CADRE DE PROJETS "CLÉ EN
MAIN", DANS LES INDUSTRIES DE TRANSFORMATION TELLES QUE LA PRODUCTION CHIMIQUE,
PHARMACEUTIQUE ET ALIMENTAIRE.

Après une première suite de contrats IChemE, dé- performance ; leur utilisation hors du contexte de l'in-
diée au marché britannique, l'IChemE a développé dustrie de transformation doit par conséquent s'ef-
en 2007 une suite de contrats consacrés aux pro- fectuer avec prudence.
jets internationaux. Elle propose de considérer un
contrat comme international lorsqu'au moins l'une de
ses parties contracte en dehors de son pays d'ori- Typologie des contrats internationaux IChemE
gine et/ou les parties reconnaissent qu'une grande
partie de l'usine sera construite avec des matériaux Il existe à ce jour quatre versions internationales des
importés dans le pays où se trouve le site. contrats, adaptés aux besoins particuliers des pro-
jets internationaux : les Livres Rouge (contrat à prix
forfaitaire), Vert (contrat à frais remboursables), Bor-
Dans quelles circonstances les contrats internatio- deaux (contrat à coûts ciblés) et Jaune (sous-traitance).
Peter Rosher naux IChemE sont-ils utilisés ? Contrairement à la suite de contrats britannique,
Avocat à la Cour  &  Solicitor qui a été révisée en 2013, la suite internationale
(Angleterre / Pays de Galles), Les contrats internationaux IChemE sont conçus pour n'a pas été modifiée depuis sa parution en 2007.
Associé, cabinet ReedSmith être utilisés dans le cadre de projets complexes
d'usines de traitement. Ils sont utilisés notamment Le Livre Rouge International (The International Red
dans des secteurs tels que le pétrole et le gaz, l'eau Book – Lump Sum) étant un contrat à prix forfaitaire,
et l'électricité, les technologies alimentaires et les convenu dès le départ, l'entrepreneur supporte le
produits pharmaceutiques, mais également dans risque que le projet coûte plus cher qu'il ne l'avait
d'autres domaines tels que le déploiement de la estimé. Il peut prétendre à des paiements supplé-
ligne de transport d'électricité souterraine sur le site mentaires dans certaines circonstances prévues au
des Jeux olympiques de 2012 à Londres. contrat, y compris en cas de conditions physiques


imprévisibles ou de renseignements inexacts four-
nis par le client.

Les contrats internationaux IChemE sont Le Livre Vert International (The International Green
Book – Reimbursable) est un contrat à frais rembour-
sables, en vertu duquel l'entrepreneur est remboursé
conçus pour être utilisés dans le cadre de de ses frais réels. Ce contrat n'incite pas l'entrepre-
neur à contenir les coûts et c'est donc le client qui
projets complexes d'usines de traitement. en assume le risque.

” La rédaction des contrats reflète les spécificités des


Le Livre Bordeaux International (The International
Burgundy Book – Target Cost) est un contrat à coûts
ciblés remboursables, aux termes duquel les parties
projets d'usines de traitement, qui diffèrent d'autres conviennent d'un objectif pour le coût total et se par-
projets de construction dans la mesure où l'acheteur tagent les économies ou les coûts supplémentaires
y achète un procédé qui doit répondre à des critères si l'objectif est dépassé. Un contrat à coûts ciblés
de performance spécifiés, sans lesquels l'usine n'a comporte plus de risques pour l'entrepreneur qu'un
aucune valeur. Ces contrats sont donc basés sur la contrat à frais remboursables, mais lui permet d'es-

22
DOSSIER

pérer une "récompense" potentielle d'économies s'il assemblage. Ils sont généralement effectués en trois
dépasse l'objectif. phases distinctes : (i) les travaux de construction ; (ii)
la procédure et les tests de réception ; et (iii) les tests
Le Livre Jaune International (The International Yel- de performance servant à démontrer que toutes les
low Book – Subcontracts) est destiné aux contrats de exigences de performance sont satisfaites.
sous-traitance dédiés à la conception, la fourniture,
la construction, le montage et/ou l'installation et les
tests d'équipements significatifs dans l'usine princi- IChemE ou FIDIC ?
pale. Il s'agit d'un contrat à prix forfaitaire, conçu
pour être utilisé indifféremment avec les trois prin- Les contrats IChemE peuvent s'avérer être une alter-
cipaux contrats internationaux Rouge, Vert ou Bor- native intéressante aux contrats FIDIC, traditionnel-
deaux. L'IChemE considère en effet qu'il est appro- lement privilégiés pour les projets internationaux, et
prié d'avoir un mécanisme de prix forfaitaire dans notamment au Livre Argenté (Silver Book) FIDIC pour
un contrat de sous-traitance, même si le contrat prin- les contrats clé en main.
cipal est un contrat à frais remboursables ou à coûts
ciblés. Les utilisateurs du Livre Jaune peuvent néan- Les principales différences entre les deux suites de
moins adopter une base de paiement différente s'ils contrats portent sur la répartition des risques et le ré-
le souhaitent, en modifiant les dispositions du contrat gime de tests. En particulier, dans les contrats FIDIC,
relatives au paiement. l'entrepreneur assume plus de risques que dans les
contrats IChemE, qui se caractérisent par des mé-
canismes plus étendus de limitation de responsabi-
Structure des contrats internationaux IChemE lité. Notamment, les contrats IChemE prévoient que
l'acheteur conserve la responsabilité de l'exactitude
Les contrats internationaux IChemE sont structurés de des documents qu'il fournit, et ils ne contiennent pas
la manière suivante : un contrat, suivi de conditions de disposition expresse en vertu de laquelle l'entre-
générales et particulières, de spécifications et d'an- preneur perd son droit à réclamation s'il ne respecte
nexes. Les conditions particulières doivent être rédi- pas les exigences en matière de préavis prévues
gées en tenant compte du droit applicable au pro- dans le contrat. S'agissant du régime de tests, ce-
jet ; à cet égard, les modèles de contrat fournissent lui-ci est plus complet dans les contrats IChemE que
un certain nombre d'exemples de conditions parti- dans les contrats FIDIC, et comprend des procédures
culières, accompagnés de notes sur la façon de les de tests exhaustives (avant et après l'achèvement)
utiliser. Les contrats comprennent en outre des notes pour s'assurer que la fiabilité de l'usine est intégra-
introductives et des notes explicatives détaillées sur lement testée et que celle-ci fonctionne parfaitement.
les différentes clauses et annexes.
Il n'existe cependant à ce jour pas de statistiques
Ils se caractérisent principalement par (i) leur ré- permettant de connaître l'étendue de l'usage des
gime de limitation de la responsabilité, et (ii) leur contrats internationaux IChemE dans le cadre de
régime de tests. projets internationaux.

Premièrement, les contrats internationaux IChemE


reconnaissent la nécessité de limiter la responsabi-
lité de l'entrepreneur. Une telle limitation est néces-
saire dans l'industrie de transformation, où un entre-
preneur ne peut assumer l'entière responsabilité des Les contrats IChemE peuvent se révéler une
conséquences d'un défaut ou d'une erreur dans sa
conception, qui peut rapidement se chiffrer en mil-
alternative intéressante aux contrats FIDIC,
lions d'euros. Ainsi, les contrats prévoient un pla-
fond global de responsabilité, ainsi qu'une clause
de recours exclusif à la garantie, une période de
traditionnellement privilégiés pour les projets
garantie courte, et une clause stipulant que le certi-
ficat final délivré à la fin ou peu après la fin de la internationaux.


période de garantie contre les défauts exclut toute
autre responsabilité de l'entrepreneur à l'égard de
l'usine et de tout vice de celle-ci.

Deuxièmement, le régime de tests prévu par les


contrats internationaux IChemE reflète la complexité
des projets d'usines de traitement. Les tests sont éten-
dus et contrôlent les différents éléments de l'usine,
puis l'ensemble de celle-ci au fur et à mesure de son

23
ÉVÉNEMENT

LE CONTRACT MANAGEMENT
À L’ÈRE DU DIGITAL
LES ACTES DU COLLOQUE ADUCMA / UNIVERSITÉ PARIS 2 PANTHÉON-ASSAS
LE 28 JUIN 2019, LES ÉTUDIANTS DU D.U. CONTRACT MANAGEMENT DE L’UNIVERSITÉ PARIS II
PANTHÉON-ASSAS ONT ORGANISÉ LEUR 5ÈME COLLOQUE PETIT-DÉJEUNER SUR LE THÉMATIQUE
« LE CONTRACT MANAGEMENT À L’ÈRE DU DIGITAL ». PLUSIEURS SUJETS ONT ÉTÉ ABORDÉS AUTOUR
DE TROIS TABLES RONDES.

La transformation “contract management 2.0 ”, des techniques contractuelles


digitale est l’un le colloque, avec le parrainage et de la pluridisciplinarité de
des grands défis de Rémy Rougeron, SVP notre fonction. Le colloque et
de notre temps que doit relever juridique du groupe Thales, a les quelques témoignages qui
le Contract Manager dans un réuni des experts de la gestion suivent sont, nous l’espérons,
contexte où le réglementaire des données personnelles, du le reflet du dynamisme et de la
prend de plus en plus le pas déploiement d’outils numériques plus-value du Contract Manager
sur le contractuel (le RGPD et du cyber-risque, à la fois issus face aux multiples exigences
en est un exemple concret) de grandes multinationales, contractuelles de notre société
et où le numérique/cyber est du corps professoral de en pleine transformation digitale.
moteur de nouveaux modes l’université, du milieu des N’hésitez pas à débattre au
de gestion des contrats avocats, du consulting, du sein de vos organisations de ces
Antoine Papegaey complexes, avec la part de monde de l’édition de logiciels, sujets contemporains, lesquels
Administrateur de l’AFCM risques qu’il faut anticiper et de l’assurance et de la appellent à une vraie prise de
et ancien Président de sécuriser tout au long du cycle finance. Cette 5ème rencontre recul sur les opportunités qu’offre
l’ADUCMA contractuel. Pour se convaincre annuelle témoigne encore de le contract management 2.0.
de ce nécessaire passage au la qualité et de la richesse Bonne lecture et bons débats ! »

Le contract manager et la protection des données :


chef d’orchestre et premier violon

Dans le cadre les données à caractère (CM) et un DPO. Certes, sur


du colloque personnel telles que définies nombre de points, le règlement
annuel consacré par l’article 4 du Règlement s’inscrit dans une continuité
cette année au “contract (UE) 2016/679 du Parlement avec les règles antérieures qu’il
management à l’ère du digital”, européen et Conseil du 27 met à l’heure. La directive du
le premier thème de réflexion avril 2016. Le “RGPD” est sans 24 octobre 1995, rédigée à
proposé par les étudiants de doute devenu, avant même son l’époque d’un internet balbutiant
la cinquième promotion du DU adoption définitive, l’un des dont était absent les réseaux Jérôme Chacornac
Contract Management était acronymes les plus célèbres de sociaux et moteurs de recherche Responsable du DU Contract
particulièrement bien choisi. notre droit, dont l’importance que nous connaissons, Management de l’Université
Les instruments digitaux sont justifiait l’introduction, au sein exigeait déjà le consentement Panthéon Assas (Paris II)
devenus par excellence du DU, d’un enseignement au traitement. Les droits à
l’espace du recueil et du dédié à compter de la rentrée l’effacement et à la rectification
traitement de tous types de 2019, dispensé conjointement des données étaient reconnus
données, dont, entre autres, par un contract manager dans la loi “informatique et

24
ÉVÉNEMENT

libertés”. Le responsable du place du défunt Correspondant non sans un certain paradoxe. un faisceau de données à
traitement était déjà soumis informatique et libertés. Le premier acteur de mise en recueillir et ainsi, à traiter.
à l’exigence de tenue d’un Toutes innovations répondant œuvre du RGPD est le DPO, Par nécessité, la courroie
registre. aux révolutions et “disruptions” “chef d’orchestre”, selon les de transmission au DPO des
Mais les innovations sont successives de l’ère digitale mots mêmes de la CNIL, contraintes opérationnelles
fondamentales : extension de survenues en à peine vingt ans et non le CM. Et pourtant, rencontrées au stade du recueil
la qualité de responsable au et dont l’ampleur explique le la problématique de la des données ne pourra qu’être,
sous-traitant ; passage d’un soin apporté à la confection protection des données lui à titre privilégié, le CM. S’il
contrôle préalable à un système du texte. La proposition de donne structurellement un rôle n’est pas chef d’orchestre,
d’autocontrôle (accountability) ; directive remonte à janvier de premier plan. En premier le CM, “homme orchestre”,
intégration de l’impératif de 2012, soit plus de quatre lieu, il sera systématiquement a vocation à faire figure de
protection des données au ans avant l’adoption du texte en contact avec les parties premier violon dans le concert
stade de l’offre avec la privacy définitif, pas moins de 3999 prenantes, à la différence d’un de la protection des données.
by design et désignation du amendements plus tard, ce qui DPO souvent situé au niveau En retour, le DPO ne pourra
récent délégué à la protection en fait le texte le plus amendé corporate de l’organigramme qu’être un indispensable
des données (DPO) pour de l’histoire de la construction d’un grand groupe. Plus interlocuteur du CM dans
tout établissement maniant européenne. déterminant est, en second lieu, la recherche d’efficacité
des données personnelles Questionner l’incidence du le constat qu’un contrat, tout opérationnelle. L’échange entre
ou assurant une surveillance RGPD sur le métier de CM au long de son cycle et dès la ses deux acteurs promet d’être
à grande échelle, en lieu et s’imposait à l’évidence mais négociation se présente comme aussi fructueux que crucial. »

Nous avons eu le coopération entre le DPO positionner comme un acteur


plaisir et l’honneur et le Contract Manager et proactif, garant du bon respect
de contribuer le notamment sur les deux sujets des règles et des bonnes
28 Juin dernier au colloque suivants : pratiques dans la gestion des
sur le “Contract Management - la façon dont le DPO s’appuie contrats ainsi que comme un
à l’ère du Digital” auprès de sur le Contract Manager acteur clé de la conformité
monsieur Jérôme Chacornac. dans la réalisation de ses de l’entreprise dans laquelle il
La table ronde, animée par missions (que ce soit dans exerce ses missions.
monsieur Sébastien Payet à l’établissement du registre Débattre sur ces sujets,
laquelle nous avons participé des traitements, le contrôle et participer au colloque
avait pour objectif de présenter l’audit des traitements réalisés et partager les retours
les enjeux du RGPD et le rôle dans le cadre d’un projet), d’expériences s’est traduit pour
Juliette Rouilloux-Sicre du Contract Manager face - la stratégie contractuelle nous, aux côtes de Jérôme
à ces nouvelles obligations relative au partage des Chacornac, par un échange de
légales et réglementaires. responsabilités entre les acteurs grande qualité.
Nous avons notamment du traitement (responsable/co- Nous espérons aussi à cette
abordé la contribution du responsables/sous-traitant). occasion avoir contribués à la
Contract Manager au respect Ce colloque a été pour nous reconnaissance, la valorisation
de la protection des données deux très enrichissant avec des et la promotion du métier de
personnelles tout au long du interactions dynamiques entre Contract Manager.
cycle de vie du projet et tout les étudiants et les intervenants.
particulièrement à la gestion Le thème du Colloque et en
des risques associés. particulier le sujet du RGPD
Le Contract Manager a un pour lequel le Contract
rôle clé dans l’application du Manager a un rôle contributif
RGPD aux contrats/projets ont permis d’aborder les
et, concernant ces derniers, nouveaux défis et les nouveau
dès le démarrage/réunion de outils des activités liées au
Laurent Gaultier lancement du projet. Contract Management à l’ère
Nous avons pu avoir des du digital.
interactions et réagir à des C’est l’occasion de souligner
interrogations sur des sujets que le métier de Contract
très intéressants liés à la Manager évolue, qu’il doit se

25
LE COIN DES EXPERTS

CONTRACTUALISATION DANS
LES PROJETS DE TYPE EPC OU
D’INSPIRATION FIDIC RÉALISÉS EN
MODE AGILE : QUELQUES EXEMPLES ET
QUESTIONS POUR ALLER PLUS LOIN !

Q
ui n’a pas entendu parler aussi très attractifs pour les autres
du management de projets domaines d’activités.
en mode Agile ? C’est un Des méthodologies mixant les
mode de conduite de projet favo- approches « prédictives » (le
risant la réussite des projets grâce classique cycle en V ou waterfall)
à une efficacité accrue, principa- et « agile » se développent, on
lement par « une transparence ac- alors parle d’hybridation. D’autres
crue, une meilleure communication méthodologies « agiles » viennent
et collaboration, une meilleure compléter le tableau actuel : Kan-
circulation de l’information et un ban, Agile at Scale etc.
développement plus rapide des
projets ». Qui n’a pas entendu parler du
management de projets en mode
Magali Benchikhoune En 2001, le manifeste Agile a dé- Agile ? C’est un mode de conduite
est Senior Consultante en veloppé, pour les projets de déve- de projet favorisant la réussite des
management de projets. loppements logiciels, un ensemble projets grâce à une efficacité ac-
Pendant plus de 25 ans, de principes [Réf.1]. Le mode Agile crue, principalement par « une


elle a dirigé des équipes, repose sur une vision incrémentale, transparence accrue, une meilleure
managé des contrats et itérative et adaptative de la ges- communication et collaboration,
mené des projets dans tion projet. Il est structuré autour de une meilleure circulation de l’infor-
les domaines de la
recherche, de l’énergie et
douze principes, résumés dans la
figure ci-contre [Réf.2]. Scrum (la
mation et un développement plus
rapide des projets ».
Mener un
de la construction au sein mêlée) est l’une des méthodologies
d’organismes français et opérationnelles les plus connues, En 2001, le manifeste Agile a dé- projet en mode
internationaux. Elle conseille, élaborée pour réaliser le travail veloppé, pour les projets de déve-
forme et accompagne à sur la base des principes Agile loppements logiciels, un ensemble Agile signifie
présent les entreprises, [Réf. 3]. de principes [Réf.1]. Le mode Agile
pouvoirs publics et institutions repose sur une vision incrémentale, privilégier les
dans leurs stratégies de Mener un projet en mode Agile si- itérative et adaptative de la ges-
conduite de projets. Dans gnifie privilégier les collaborateurs tion projet. Il est structuré autour de collaborateurs et
cet article, elle partage sa et leurs interactions par rapport aux douze principes, résumés dans la
curiosité pour l’application process et aux outils, le dévelop- figure ci-contre [Réf.2]. Scrum (la leurs interactions
du mode Agile dans le pement du logiciel par rapport à mêlée) est l’une des méthodologies
cadre de projets de type une documentation complète, la opérationnelles les plus connues,
EPC ou d’inspiration FIDIC. collaboration avec le client par élaborée pour réaliser le travail
par rapport aux
rapport à la négociation du contrat sur la base des principes Agile
et la flexibilité par rapport à une [Réf. 3]. process et aux
planification rigide. Mener un projet en mode Agile si-
gnifie privilégier les collaborateurs outils.


Initialement prévus pour les projets et leurs interactions par rapport aux
informatiques, ces principes sont process et aux outils, le dévelop-

26
LE COIN DES EXPERTS

Les 12 principes du manifeste Agile. Illustration de Lynne Cazaly

pement du logiciel par rapport à Qu’en est-il du mode Agile et des éléments de réponse autour sujet, mais l’application concrète
une documentation complète, la projets de type Engineering Pro- d’exemples de projets concrets, du mode Agile pour ce type de
collaboration avec le client par curement and Construction (EPC) dans l’idée de susciter votre curio- projets reste toutefois encore dis-
rapport à la négociation du contrat ou d’inspiration FIDIC ? Comment sité et le débat ! crète. Voyons quelques exemples.
et la flexibilité par rapport à une appliquer ou adapter principes
planification rigide. et tendances agiles, ou hybrides, >> Un projet industriel de re-
Initialement prévus pour les projets pour conduire ces grands projets QUESTION N°1 : cherche, de développement et
informatiques, ces principes sont complexes menés généralement en Y A-T-IL DES PROJETS de démonstration [réf.4]
aussi très attractifs pour les autres mode prédictif, par exemple dans EPC OU D’INSPIRATION
domaines d’activités. l’industrie de la construction ou de FIDIC UTILISANT LE Un premier exemple de projet
Des méthodologies mixant les l’ingénierie industrielle ? Exist MODE AGILE POUR LA industriel, avec le Département
approches « prédictives » (le e-t-il des exemples concrets et des CONDUITE DU PROJET ? américain de l’Energie pour don-
classique cycle en V ou waterfall) retours d’expérience à partager ? neur d’ordre. L’industriel Centrus
et « agile » se développent, on Et comment contractualise-t-on Oui, il existe bien sûr des projets Energy Corp. a réalisé de 2012
alors parle d’hybridation. D’autres dans de telles conditions ? non-IT, de type EPC ou d’inspira- à 2014 un projet de R&D et de
méthodologies « agiles » viennent Même si le sujet nécessite des tion FIDIC se déroulant selon le démonstration de 350 M$USD
compléter le tableau actuel : Kan- développements bien plus détail- mode Agile. Articles et commu- pour confirmer la maturité de la
ban, Agile at Scale etc. lés, l’article ici considère quelques nications théoriques explorent le technologie américaine d’enri-

1 - https://agilemanifesto.org/iso/fr/principles.html
2 - https://www.planisware.com/hub/article/how-non-it-or-non-software-teams-can-use-agile-methodologies
3 - https://www.scrumguides.org/scrum-guide.html
4 - Straçusser, G. (2015). Agile project management concepts applied to construction and other non-IT fields. Paper presented at PMI® Global Congress 2015—
North America, Orlando, FL. Newtown Square, PA: Project Management Institute.
LE COIN DES EXPERTS

chissement de l’uranium. D’après projet a servi en quelque sorte de résultats positifs sont détaillés dans dans les projets de construction.
ce qui est rapporté dans la publi- test, puisqu’il a été suivi par un l’article de S. Orrell. La création A suivre avec attention !
cation, la réussite du projet doit programme de trois projets d’un d’une culture commune quelle que
beaucoup à l’utilisation d’outils et montant de l’ordre de 3 milliards soit la partie prenante, le partage Un projet spatial [Réf.7] !
de méthodologies agiles (lesquels de dollars canadiens [Réf.5]. d’une vision commune du projet,
ne sont pas précisés) : « Centrus la définition de critères de perfor- Pour terminer les exemples, je sou-
completed the RD&D program Quelques mois après le démar- mance gagnants - gagnants ont été haitais mentionner l’application
within budget and on schedule. rage du premier projet (fin 2010), parmi les principaux points menant du Scrum pour un grand projet
DOE certified the completion of all la situation n’était pas satisfai- à la réussite du programme. L’auteur spatial. Rappelons qu’un projet
ten program technical milestones sante : pas de connaissance sur conclut que Scrum est applicable spatial se déroule en étapes très
and all five performance indica- la situation réelle du projet, pas quel que soit le domaine d’activités précisément prédéfinies compor-
tors.” L’article mentionne briève- de priorités clairement définies, du projet, et que la réussite du pro- tant de nombreuses phases et
ment que les contrats (ingénierie, manque de communication entre jet réside surtout dans la façon dont revues de projet conséquentes et
conception, construction, ...) ont les équipes, etc. Une méthodolo- les équipes travaillent ensemble. obligatoires. EUCLID est un projet
été des contrats de type « time & gie Scrum est mise en place avec porté par l’Agence Spatiale Eu-
materials », et que l’ensemble des l’appui d’un petit groupe de per- Dans une communication privée ropéenne. Ses objectifs sont de
travaux a été effectué selon les pro- sonnes expertes en mode Agile, concernant les aspects contrac- cartographier la matière noire et
cédures de Centrus Energy Corp. et en quelques mois, la situation tuels, Simon Orrell a précisé que de détecter l’énergie noires de
a évolué positivement ! A tel point les contrats associés à ces projets l’Univers ! La partie dite « ground
>> Des projets industriels dans qu’au final, l’équipe projet a été en étaient « classiques », basés sur segment » du projet, c’est-à-dire
l’industrie du gaz au Canada mesure de tenir à jour le planning du « time & materials » avec des celle qui traite toutes les données
[réf.5] initial (décembre 2012), d’ache- mesures incitatives, et que ce qui au sol, a été et est encore menée
ver les travaux de construction à a été le plus important, ce sont en appliquant la méthode Scrum.
Voyons ici le riche retour d’expé- temps et de respecter l’enveloppe les relations de confiance et de Christian Surace, chef de projet au
riences sur des projets de type budgétaire. Ce qui fut considéré transparence entre la MOA, la sein du Laboratoire d’Astrophysique
EPC/EPCM dans l’industrie du comme un exploit compte tenu du MOE et les différents prestataires de Marseille, parle d’« EUCLIDisa-
gaz au Canada. retour d’expérience des projets de et fournisseurs, et la connaissance tion » de l’Agilité. Bien sûr la partie
ce type présentant en moyenne précise de l’état du projet. C’est « ground segment » du projet est
Simon Orrell présente dans son 48 % de dépassement du budget avant tout du bon sens ! du domaine informatique. Mais
article la mise en pratique des et 18 % de retard ! à elle seule, elle représente plus
principes et des valeurs de Scrum Les projets de construction à de 600 personnes intervenant
dans un premier projet d’un mon- La même approche a été déployée présent ! principalement à distance (scien-
tant de plusieurs centaines de pour le programme de construction tifiques, techniciens et ingénieurs,
millions de dollars canadiens. Ce de 3 sites industriels. Les mêmes En ce qui concerne les projets de organismes publics et industriels),
construction, je reprends ici les élé- un budget de plusieurs dizaines
ments publiés dans le cadre d’une de M€ et un planning dont on
conférence donnée en 2018 à la imagine sans peine les exigences
Royal Institution of Chartered Sur- liées au lancement du satellite. Pour
veyors [Réf.6]. V. Francis et al. ont le chef de projet, Scrum a permis
investigué l’application des prin- un « retour facilité sur les actions


cipes Agile pour des projets de en cours, les actions passées, les
construction. L’attrait des principes livrables, les documents ».
agiles est souligné, en particulier
lors des étapes de faisabilité et de Ces exemples montrent que les
Les méthodologies agiles sont conception des projets de construc- méthodologies agiles sont ap-
tion, notamment en raison du coût plicables à de grands projets
applicables à de grands projets relativement moins élevé des mo- complexes. Elles permettent une
difications. Plutôt que l’adoption vision partagée, apportent une
complexes. Elles APPORTent une stricte des principes du Scrum, l’ar- compréhension partagée de l’état
ticle met en avant l’intérêt de l’« état du projet, et favorisent l’accepta-
vision et une compréhension d’esprit agile » pour les projets de tion des modifications en tant que
construction et suggère que les partie intégrante du processus. Tout
partagée de l’état du projet, et méthodes agiles peuvent être ap- cela implique des changements de
propriées pour gérer des phases culture au sein des entreprises, des
favorisent l’acceptation des spécifiques ou des lots de travaux
de construction spécifiques : le
organisations, ils sont essentiels au
succès des projets en mode Agile.

modifications. 
mode hybride donc ? Les auteurs
concluent en jetant les bases d’une Comment cela se traduit-il dans les


étude plus complète sur la phase aspects contractuels entre les diffé-
d’appel d’offres en mode Agile, rentes parties ? Est-ce que le mode

28
LE COIN DES EXPERTS


Agile, la méthodologie Scrum ou la conférence – débat intitulée Agile Framework® (Safe®) pour
hybride se déploient aussi au sein Flexible, « Contrats agiles dans le cadre de une approche contractuelle Lean-
des services Achats, juridiques ..., la réalisation de projets innovants : Agile : « SAFe Managed-Invest-
parties prenantes centrales des pro- ajustable, le un changement majeur dans l’or- ment Contract’ ».
jets EPC ou FIDIC ? Et qu’en est-il ganisation des relations contrac-
du rôle du Contract Manager dans contrat agile tuelles ? » [Réf. 9, 10] a présenté et 2). http://blog.beule.fr/ana-
de telles conditions ? les principes clés et les modalités lyses-dexpert/le-contrat-agile-ce-
permet de faire d’application des contrats agiles nest-pas-si-simple-que-ca/
en les comparant aux contrats Une présentation sur le contrat
QUESTION N°2 : face aux aléas dits classiques : « Le contrat agile Agile faite par Franck Beulé le
COMMENT devient aujourd’hui un outil incon- 17 juin 2016 à Agile France au
CONTRACTUALISER
POUR DES PROJETS
de l’exécution tournable pour contractualiser les
engagements des parties. Flexible,
titre tout à fait évocateur et parfait
pour poursuivre les échanges et
DE TYPE EPC OU FIDIC ajustable, il permet aux parties de pour une suite à cet article !
UTILISANT LA MÉTHODE et de maintenir faire face aux aléas de l’exécution
AGILE ? et de maintenir la qualité de la re-
la qualité de la lation tout en préservant les droits
En matière de contrats en mode des parties. »
Agile, les entreprises Xebia, Cellen- relation tout Parmi les fondamentaux des
za, Alerion et LCA ont proposé contrats agiles :
une trame de contrat pour des en préservant • Le respect mutuel, la coopération
prestations de développement pour le bien de tous, le renforce-
de logiciels : « Contrat de pres-
tation de services réalisés selon
les droits des ment du devoir de collaboration
du client,
les méthodologies Agile » [Réf. • La détermination commune des
8]. Dans le modèle proposé, les parties. priorités et la définition d’objec-


rubriques classiques d’un contrat tifs mutuels,
sont présentes : objet du contrat, • L’acceptation de la critique po-
documents contractuels, conditions sitive et constructive,
financières et juridiques ... et un
effort conséquent est apporté Et vous, menez-vous des projets
pour expliquer le fonctionnement EPC / EPCM ou de type FIDIC en
en mode Agile, présenter les rôles mode Agile ? Comment contrac-
et missions de chacune des parties tualisez – vous ?
en introduisant les rôles spécifiques
de la méthodologie Scrum, s’ac- Pour terminer, je vous laisse avec
corder sur le vocabulaire associé. ces deux liens sur le sujet, à décou-
Un ensemble d’annexes au contrat vrir à tête reposée.
contient les définitions, les engage-
ments qualité, et offre la possibilité 1). https://www.scaledagile.
au Prestataire d’ajuster son estima- com/pmi-webinar/
tion (charges, structure, délais) Ce webinaire décrit les modalités
selon des modalités convenues contractuelles traditionnelles et les
au début du contrat. En 2018, compare aux approches du Scaled

5 - https://www.rics.org/fr/news-insight/research/conference-papers/improving-construction-bidding-practices-through-scrum-project-framework/
et Can construction bidding practices be improved through use of Scrum project framework ? Valerie Francis1, Paulo vaz Serra2, Andre Ullal3,4 & Aslan Ghods
Nahri5 1,2,3,5 Faculty of Architecture, Building and Planning, The University of Melbourne, Parkville Campus, Victoria, Australia, 3010. 4 School of Architecture,
Civil and Environmental Engineering, École Polytechnique Fédérale de Lausanne, Switzerland
6 - Executing Large EPC/EPCM Projects using Scrum Values and Principles An Experience Paper © snowdolphin 2016 by Simon Orrell et communication privée
7 - https://sci.esa.int/web/euclid et communication privée
8 - http://www.contrat-agile.org/contrats/Contrat_Agile_V1.1.pdf
Contrat de prestation de services réalisés selon les méthodologies agiles contact@contrat-agile.org
9 - « Les contrats agiles : un changement majeur dans l’organisation des relations contractuelles ? » - Conférence débat aux Arts & Métiers, avril 2018, Jean-Charles
Savornin, Gregory Leveau et Maître Arnaud Tessalonikos https://tv.arts-et-metiers.fr/contrats-agiles-changement-majeur-lorganisation-relations-contractuelles/
10 - http://www.contractence.fr/contrats-agiles/
LE COIN DES EXPERTS

LE SOFT CONTRACT MANAGEMENT (SCM)


DANS LES PROJETS DE GENIE-CIVIL
A l’instar de cette ancienne pra- L’ART D’ÉVITER tation du contrat - qui se transforme
tique, il existe une autre approche, LES LITIGES souvent en guerre de tranchée - le
que l’on qualifiera de « Soft Le Soft Contract Management SCM mise plutôt sur le pouvoir ver-
Contract Management » (SCM), trace le chemin de moindre résis- tueux de l’échange collaboratif et
et qui privilège la résolution au fil tance contractuelle, dans l’intérêt de la négociation, couplé à une
de l’eau des problèmes dès leur bien compris des parties. A l’ins- vraie volonté de trouver rapide-
survenance ou leur connaissance. tar du Hard Contract Management ment des solutions face aux sujé-
qui s’appuie sur l’exploitation par- tions imprévues ou aléas, inhérents
AVANTAGES fois vigoureuse des droits et obliga- aux travaux dans le Génie Civil.
Le Soft Contract Management est tions de chacun, le Soft Contract Cet article introductif ne saurait
basé sur une approche collabora- Management privilégie quant à bien entendu traiter toutes les di-
tive et transparente entre les par- lui, le savoir-être contractuel en re- mensions du Soft Contract Mana-
Tayeb Naidji, ties. cherchant à tout moment le meil- gement. J’espère néanmoins qu’il
Senior Contract Manager, Cette méthode présente plusieurs leur équilibre de la relation et l’in- contribuera à en vulgariser l’esprit
RAZEL-BEC avantages immédiats : térêt du projet. et le bon usage dans les projets
• le traitement rapide des pro- Il s’agit d’une véritable philosophie de Génie-Civil ou de la Construc-
blèmes permet d’éviter qu’ils gagnante-gagnante de la relation tion en général.
prennent trop d’ampleur ou qu’ils contractuelle. En d’autres termes, le Dans l’idéal et de toute évidence,
en produisent d’autres ; SCM c’est l’art d’éviter les litiges, les acteurs de l’acte de construire
• les enjeux en termes de planning grâce à une anticipation parta- y gagneraient à intégrer dans leur
et financiers sont mieux maitrisés ; gée des évènements potentielle- Plan de Management de Contrat,

L
• il est plus facile de trouver un ment préjudiciables au projet. Le cette philosophie contractuelle col-
es idées reçues ont la vie accord entre les parties. Soft Contract Management per- laboratrice et constructrice de va-
dure. Dans le secteur du Gé- Cette méthode s’avère d’autant met aussi aux parties de mieux ap- leur.
nie-civil, le Contract Mana- plus intéressante, qu’elle peut préhender les aspects coûts et dé-
gement est souvent qualifié - à tort démarrer dès la phase d’appel lais de leur projet ainsi que leurs
et de façon péjorative - de Claim d’offre et tisser un lien naturel entre évolutions.
Management. la phase commerciale et la phase On peut ajouter que la pratique du
Cette image héritée d’anciennes d’exécution. Le Soft Contract Ma- SCM chez le Constructeur ne doit
pratiques contractuelles, résulte en nagement se poursuit alors tout au pas se limiter uniquement à sa re-
partie du traitement des différends long du cycle de la vie contrac- lation avec le Maître d’Ouvrage


repoussé en fin de chantier. Elle est tuelle du projet. mais y gagne aussi à s’étendre
renforcée par l’amalgame, encore aux relations avec ses cotraitants,
vivace sur les chantiers, entre le BONNES PRATIQUES sous-traitants, fournisseurs et par-
mécanisme de «réclamation» dans On citera quelques exemples de tenaires.
les marchés de travaux et la notion bonnes pratiques du SCM : L’approche du SCM peut sembler Le SCM privilège
de «Claim» importée du système • Identification, chiffrage et ré- plus complexe et sensible à pilo-
anglo-saxon. partition des risques et opportuni- ter. Elle oblige en effet les interve- la résolution au
Ainsi, le choix de résoudre les dif- tés entre le Maître d’Ouvrage et nants à plus d’échanges, à travers
férends en fin d’opération, conduit le Constructeur, à travers la mise le partage régulier d’informations fil de l’eau des
à adopter un mode de gestion en place concertée d’une matrice et la négociation au fil de l’eau. En
contractuelle que l’on qualifie- des risques. contrepartie, elle est plus efficace
problèmes dès
ra de « Hard Contract Manage- • Création de tableaux de bord et permet d’apprécier les enjeux
ment ». Les relations contractuelles intégrant des indicateurs communs contractuels du projet de façon
sont tendues entre les parties. Du de performance contractuelle et de plus globale. Elle atténue égale-
leur survenance
fait notamment d’un nombre élevé projet, puis suivi régulier entre le ment les tensions contractuelles.
de correspondances entre les in- Maître d’Ouvrage et le Construc- ou leur
tervenants, devenues nécessaires teur. CONSTRUIRE
pour tracer des faits ou des évène- • Rédaction des comptes rendus DE LA VALEUR connaissance.


ments qui ne seront plus visibles à de réunion en séance et valida- En lieu et place de la stratégie clas-
la réception des travaux. tion en direct par les participants. sique de performance ou d’exploi-

30
LELECOIN
COINDES
DESLECTEURS
EXPERTS

« LE CONTRACT MANAGEMENT »,


Une nouvelle édition du livre de Alain Brunet et Franck César
est paru le 3 octobre 2019 chez Eyrolles.

monde anglo-saxon. Au travers d’abord une attitude ». Il était


de ces discussions, souvent pour nous important de ne
passionnantes, nous avons pas dévier de cette affirmation
acquis la conviction qu’au-delà essentielle qui constitue le fil
de sa dimension traditionnelle, rouge de cette seconde édition.
le contract management ne
pourra se soustraire au défi
du numérique et aux nouvelles
tendances managériales,
largement développées dans
l’ouvrage. Plus prosaïquement,
après plusieurs réimpressions, le
livre était à nouveau épuisé et le
moment était venu de partager
le fruit de nos travaux !

Pouvez-vous nous introduire


les principaux apports de la
nouvelle édition ?
Au-delà de l’enrichissement
des chapitres existants (avec
notamment l’ajout de nombreuses
illustrations et bonnes pratiques)
nous avons procédé à une mise
à jour exhaustive des innovations Propos recueillis
qui s’offrent maintenant au par Rolland Terrin
contract manager : (i) les
communautés de pratiques, qui
renforcent la collaboration entre


professionnels, (ii) les nouvelles
Alain, Franck, pouvez-vous publication, notre ambition de méthodes de conception, comme
nous rappeler les grandes départ s’est trouvée largement les méthodes agiles et le BIM
thématiques abordées dans confortée par la variété des (Building Information Modeling),
votre livre ? lecteurs (Contract Managers et (iii) les outils de type Contract Au-delà de
La première édition de au-delà !) et des usages qui sont Lifecycle Management (CLM)
l’ouvrage avait pour vocation faits du livre, par les praticiens qui viennent automatiser tout ou l’enrichissement
de s’adresser à un public de en entreprise. partie du processus, (iv) le Legal
professionnels aussi large Design, nouveau concept mis des chapitres
que possible (dirigeants, Le JCM1 au travers de sa en avant au sein des directions
ingénieurs, juristes…) avec une thématique « les livres français juridiques, (v) les technologies existants, nous
approche résolument orientée sur le Contract Management » de l’intelligence artificielle (IA)
présentait l’édition originale.
vers l’amélioration de la
performance. Les méthodes et Pouvez-vous nous expliquer les
et la blockchain, et enfin (vi)
les bénéfices attendus des
avons procédé à
pratiques qui y sont présentées raisons d’une nouvelle édition ? outils d’aide à la décision pour
allient une vision pragmatique Cette nouvelle édition doit résoudre les litiges. une mise à jour
du contrat sans pour autant beaucoup aux rencontres
renoncer aux apports novateurs que nous avons eues et à nos Quelle serait votre conclusion ? exhaustive des
des disciplines comme expériences respectives au cœur Avec son sens de la formule,
l’économie, la psychologie de cette pratique nouvelle qui Coralie Bouscasse (Présidente innovations.


expérimentale, voire la jusqu’à présent semblait plus de l’AFCM) nous dit que « le
sociologie. Six ans après sa particulièrement imprégner le Contract Management est

31
LA VIE DE NOS ASSOCIATIONS
Voici quelques événements autour du contract management qui se sont déroulés au cours du
second semestre 2019. Cette liste n’est pas exhaustive mais montre l’activité croissante de notre
communauté.

JUIN 2019 NOVEMBRE 2019


25 juin 2019 22 novembre 2019
Remise des Trophées du Contract Management. Assemblée Générale de l’AFCM
Lauréats 2019:
PROGRAMME DÉTAILLÉ :
• Gautier MARCY – Contract Manager de l’année
• Horisis Conseil – Innovation en Contract Management • 08h30-09h00 : Accueil & petit-déjeuner
• EDF – Approche collaborative en Contract Management •0  9h00-10h00 : Assemblée Générale de l'AFCM
• Isabelle ROUX-CHENU – Contribution exceptionnelle (réservée aux adhérents)
en Contrat Management • 10h00-10h30 : Pause Networking
• 10h30-11h15 : « Manières innovantes de mieux communiquer
et parler du Contract Management pour convaincre »
28 juin 2019
1. Rayan Cherif (Horisis Conseil) pour la présentation
Colloque ADUCMA / DU Contract Management d’Assas du sur de la web série « LE PROJECT »
« Le Contract Management à l’ère du Digital », parrainé par Rémy 2. Témoignage d’Isabelle Roux-Chenu (Capgemini) -
Rougeron, SVP Legal & Contracts du groupe Thales. Comment convaincre les décideurs
- 1ère table ronde : « Le Contract Management au service du RGPD » 3. Franck César (Willbe Group)/Alain Brunet(Thales)
- 2ème table ronde : « Le Contract Management à l’heure des outils et la nouvelle édition du livre «Le Contract Management»
digitaux » • 11h15-12h15 : « Outils et questionnaires d’évaluation de
- 3ème table ronde : « Le Contract Management face au maturité en Contract Management » ; Présentation, utilisation
cyber-risque » des outils et des questionnaires, échanges, Questions/Réponses
• 12h15-13h30 : Cocktail déjeuner

SEPTEMBRE 2019 26 novembre 2019


Première conférence du DU International Construction Contracts (I2C)
19 septembre 2019 de l’université Panthéon-Assas Paris II portant sur le nouveau modèle de
Séminaire – Session 5 du cabinet Pinsent Masons sur “Quantum in contrat FIDIC
Construction Arbitration: how to prove your loss – a comparative
law approach”
DÉCEMBRE 2019
30 septembre 2019
Pré-rentrée et rencontre de l’ADUCMA avec les étudiants de la 4 décembre 2019
promo n°6 (2019 – 2020) du DU Contract Management de Master class Reedsmith "Pitfalls ans solutions in contrat management"
l’université Panthéon-Assas Paris II
5 décembre 2019
Forum Ouvert du Contract Management organisé par l’Ecole Européenne
OCTOBRE 2019 du Contract Management (e2cm) et le cabinet Orrick

7 octobre 2019 10 décembre 2019


Soirée spéciale “Blockchain et smart contracts – quelles interactions Café-débat proposé par la Commission Carrière et Développement
avec le réel ?” organisée par les Arts et Métiers en partenariat avec professionnel : "La Place du Contract Management face aux impératifs
l’Ecole Européenne de Contract Management (e2cm), Jean-Charles calendaires d'un projet", avec la participation de Xavier Leynaud
Savornin et le cabinet Atalex
20 décembre 2019
17 octobre 2019 Atelier CV proposé par la Commission Carrière et Développement
Assemblée Générale Ordinaire de l’ADUCMA portant sur l’élection Professionnel de l’AFCM au sein des locaux de Fed Légal,
du nouveau Président et de son bureau 2019 - 2020 17, rue d’Astorg, 75008 Paris. Inscription : cdp@afcm-asso.fr

POUR ADHÉRER À L’AFCM POUR ADHÉRER À L’ADUCMA

Dans la rubrique adhésion du site Internet www.afcm-asso.fr Vous êtes un élève ou un ancien élève du Diplôme Universitaire
Pourquoi adhérer ? 5 raisons : de Contract Management d’Assas ou vous souhaitez devenir
un membre bienfaiteur ou membre d’honneur et participer
1. Favoriser le développement et le rayonnement de la profession. au développement du contract management et des activités
2. Se former tout au long de sa carrière et être au fait de l’actualité. de l’ADUCMA avec des étudiants et des professionnels
3. Apporter son élan à une profession en plein essor. passionnés et motivés ?
4. Donner un nouvel élan à sa carrière de contract manager.
Demandez votre adhésion à l’adresse presidence@aducma.com
5. Participer au journal et en être destinataire.
ou remplissez le bulletin sur le site : www.aducma.com/adherer

Vous aimerez peut-être aussi